PROCUREMENT PLAN (Textual Part) Project information: Pakistan: SINDH EARLY LEARNING ENHANCEMENT THROUGH CLASSROOM TRANSFORMATION (P172834) Project Implementation agency: REFORM SUPPORT UNIT, EDUCATION & LITERACY DEPT., GOVT. OF SINDH Date of the Procurement Plan: January 12, 2022 Period covered by this Procurement Plan: January 2022- June 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017, August 2018 and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in respective Public Procurement Rules, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or prospective bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 2) For national open competitive procurement, only the model procurement documents acceptable to the World Bank, shall be used. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) Access to procurement opportunities shall not be restricted to firms that have pre-registered and/or paid a registration fee. 6) No preference of any kind shall be given to national bidders in the bidding process. 7) Procurement methods that use two-envelope process and rated criteria shall be subject to Bank’s prior concurrence When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works); Goods: is not applicable, Works: is not applicable. Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Pakistan : Sindh Early Learning Enhancement through Classroom Transformation PLAN General Information Country: Pakistan 2022-01-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172834 GPN Date: 2022-01-27 Project Name: Sindh Early Learning Enhancement through Classroom Transformation Loan / Credit No: TF / B6208, IDA / 69730 Reform Support Unit, Education & Literacy Dept., Govt. of Sindh Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-RSU-SINDH-365306-CW-R FQ / Hiring of contractor to e Monitoring and evaluation a Request for Quota Single Stage - One E Other (with field f Pending Imp 2024-02-1 TF / B6208 Post Open - National 48,780.00 0.00 2023-06-21 2023-08-16 xecute small works to remod nd project management tions nvelope or explanation) lementation 2 el and establish office space GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-RSU-SINDH-324868-GO-R Developing an effective and Request for Quota Single Stage - One E FQ / Shopping of the IT Equip IDA / 69730 Post Open - National 32,040.00 0.00 Signed 2022-11-12 2022-12-14 2022-12-26 2023-01-25 safe learning environment tions nvelope ments for PMIU Staff PK-RSU-SINDH-324869-GO-R Developing an effective and Request for Quota Single Stage - One E IDA / 69730 Post Open - National 25,119.00 0.00 Signed 2022-11-12 2023-01-30 2022-12-30 2023-01-29 FQ / Shopping of Furniture fo safe learning environment tions nvelope r PMIU PK-RSU-SINDH-324943-GO-R Developing an effective and Request for Quota Single Stage - One E IDA / 69730 Post Open - National 25,692.00 0.00 Signed 2022-11-09 2022-12-22 2023-01-21 FQ / Shopping of Machinery's safe learning environment tions nvelope for PMIU PK-RSU-SINDH-365274-GO-R Improving system capacity f Request for Quota Single Stage - One E Pending Impl FQ / Procurement of Servers TF / B6208 or better school leadership a Post Open - National 17,421.00 0.00 2023-06-26 2023-08-21 2023-09-20 tions nvelope ementation (quantities-02) nd management support PK-RSU-SINDH-365308-GO-R Monitoring and evaluation a Request for Quota Single Stage - One E Pending Impl FQ / Procurement of Laptops TF / B6208 Post Open - National 8,995.00 0.00 2023-06-26 2023-08-21 2023-11-19 nd project management tions nvelope ementation and printers (LOT NO 1) PK-RSU-SINDH-365305-GO-R FQ / Procurement of Vehicle Monitoring and evaluation a Request for Quota Single Stage - One E Under Imple TF / B6208 Post Limited 33,449.00 0.00 2023-06-26 2023-08-21 2024-02-17 s (LOT NO 2) nd project management tions nvelope mentation Category of Vehicles: Cars PK-RSU-SINDH-365325-GO-R Monitoring and evaluation a Request for Quota Single Stage - One E Pending Impl FQ / Procurement of Electric TF / B6208 Post Open - National 8,303.00 0.00 2023-06-26 2023-08-21 2023-11-19 nd project management tions nvelope ementation Appliances (LOT NO 3) PK-RSU-SINDH-365301-GO-R FQ / Procurement of Vehicles Monitoring and evaluation a Request for Quota Single Stage - One E Under Imple TF / B6208 Post Limited 87,587.00 0.00 2023-06-26 2023-08-21 2024-02-17 (LOT NO 1) nd project management tions nvelope mentation Category of the vehicles: car s PK-RSU-SINDH-365319-GO-R Monitoring and evaluation a Request for Quota Single Stage - One E Pending Impl FQ / Procurement of Furnitur TF / B6208 Post Open - National 17,073.00 0.00 2023-06-26 2023-08-21 2023-11-19 nd project management tions nvelope ementation e (LOT NO 2) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-RSU-SINDH-319496-CS-Q CBS / Hiring of Consultancy fi Developing an effective and Quality And Cost- Open - Internationa Under Implement TF / B6208 Prior 2,676,886.00 0.00 2022-10-21 2022-10-21 2022-10-30 2022-10-24 2022-12-14 2023-05-16 2023-01-30 2023-03-01 2023-03-31 2023-04-24 2026-10-22 rm for the design and supervi safe learning environment Based Selection l ation sion of Civil Work PK-RSU-SINDH-365256-CS-C Improving system capacity f QS / Hiring of Consultancy fir Consultant Qualifi TF / B6208 or better school leadership a Post Open - National 260,000.00 0.00 Under Review 2023-06-20 2023-06-22 2023-07-11 2023-08-15 2023-09-14 2023-10-19 2024-06-15 m for the Early Grade Readin cation Selection nd management support g Assessment (EGRA) Baselin e Survey PK-RSU-SINDH-365266-CS-C QS / Hiring of Technical Assis Improving system capacity f Consultant Qualifi tance (TA) Firm for capacity TF / B6208 or better school leadership a Post Open - National 250,198.00 0.00 Under Review 2023-06-23 2023-06-22 2023-07-03 2023-08-07 2023-08-31 2023-10-05 2025-03-28 cation Selection building of school leadership nd management support and local education Manage ment INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-RSU-SINDH-270660-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of Financial Mana TF / B6208 Post Open 20,410.00 0.00 Terminated 2021-12-31 2021-12-20 2022-02-18 2022-09-07 2022-03-11 2022-09-13 2022-04-15 2023-04-15 nd project management ant Selection gement Specialist Page 1 PK-RSU-SINDH-270905-CS-IN DV / Terms of Reference for Monitoring and evaluation a Individual Consult TF / B6208 Post Open 20,410.00 0.00 Signed 2021-12-31 2021-12-20 2022-02-18 2023-01-19 2022-03-11 2022-09-05 2022-04-15 2023-04-15 Hiring of Procurement and Co nd project management ant Selection ntract Specialist (Consultant) PK-RSU-SINDH-270910-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of Environment, C TF / B6208 Post Open 13,607.00 0.00 Signed 2021-12-31 2021-12-20 2022-02-18 2022-08-16 2022-03-11 2022-09-13 2022-04-15 2023-04-15 nd project management ant Selection ommunity Health and Safety Specialist PK-RSU-SINDH-270912-CS-IN Monitoring and evaluation a Individual Consult Under Implement DV / TORs for Hiring of Gend TF / B6208 Post Open 13,607.00 0.00 2021-12-31 2021-12-20 2022-02-18 2022-03-11 2022-04-15 2023-04-15 nd project management ant Selection ation er Specialist PK-RSU-SINDH-270914-CS-IN Monitoring and evaluation a Individual Consult DV / TORs for Hiring of Social TF / B6208 Post Open 13,607.00 0.00 Signed 2021-12-31 2021-12-20 2022-02-18 2022-05-20 2022-03-11 2022-09-13 2022-04-15 2023-04-15 nd project management ant Selection Safeguard Consultant PK-RSU-SINDH-299355-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of Consultant PMI TF / B6208 Post Open - National 17,815.00 0.00 Canceled 2022-06-10 2022-09-15 2022-07-29 2022-08-19 2022-09-23 2023-09-23 nd project management ant Selection U-Civil Work: Lead Project En gineer PK-RSU-SINDH-299349-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of PMIU-Socio-Em TF / B6208 Post Open - National 10,400.00 0.00 Signed 2022-06-10 2022-09-15 2022-07-29 2023-04-05 2022-08-19 2023-04-05 2022-09-23 2023-09-23 nd project management ant Selection otional Support (SES) Special ist PK-RSU-SINDH-299350-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of PMIU- Assistant TF / B6208 Post Open - National 5,940.00 0.00 Signed 2022-06-10 2022-10-19 2022-07-29 2023-02-07 2022-08-19 2023-02-07 2022-09-23 2023-09-23 nd project management ant Selection CPD Specialist-Literacy PK-RSU-SINDH-299351-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of PMIU- Item Ban TF / B6208 Post Open - National 10,400.00 0.00 Signed 2022-06-10 2022-09-15 2022-07-29 2022-12-14 2022-08-19 2023-02-07 2022-09-23 2023-09-23 nd project management ant Selection k Manager PK-RSU-SINDH-299358-CS-IN Monitoring and evaluation a Individual Consult TF / B6208 Post Open - National 17,815.00 0.00 Signed 2022-06-10 2022-09-15 2022-07-29 2023-03-27 2022-08-19 2023-04-03 2022-09-23 2023-09-23 DV / Hiring of PMIU- M&E Sp nd project management ant Selection ecialist PK-RSU-SINDH-299344-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of PMIU- Continuo TF / B6208 Post Open - National 14,850.00 0.00 Signed 2022-06-10 2022-10-19 2022-07-29 2023-04-04 2022-08-19 2023-05-02 2022-09-23 2023-09-23 nd project management ant Selection us Professional Development Specialist - PK-RSU-SINDH-299330-CS-IN DV / Hiring of PMIU-Continuo Monitoring and evaluation a Individual Consult Under Implement TF / B6208 Post Open - National 14,850.00 0.00 2022-06-10 2022-10-19 2022-07-29 2022-08-19 2022-09-23 2023-09-23 us Professional Development nd project management ant Selection ation Specialist (STEDA) PK-RSU-SINDH-299356-CS-IN DV / Hiring of PMIU-Student A Monitoring and evaluation a Individual Consult TF / B6208 Post Open - National 10,400.00 0.00 Signed 2022-06-10 2022-09-15 2022-07-29 2023-02-07 2022-08-19 2023-02-07 2022-09-23 2023-09-23 ttendance Monitoring and Re nd project management ant Selection dress Specialist PK-RSU-SINDH-299357-CS-IN Monitoring and evaluation a Individual Consult TF / B6208 Post Open - National 11,875.00 0.00 Signed 2022-06-10 2022-09-15 2022-07-29 2023-05-11 2022-08-19 2023-05-11 2022-09-23 2023-09-23 DV / Hiring of PMIU-Manager nd project management ant Selection MIS PK-RSU-SINDH-315931-CS-IN Monitoring and evaluation a Individual Consult DV / PMIU-Labour Manageme TF / B6208 Post Open - National 5,085.00 0.00 Canceled 2022-09-19 2022-10-19 2022-10-17 2022-10-24 2022-11-07 2022-12-07 nd project management ant Selection nt Specialist PK-RSU-SINDH-315951-CS-IN Improving system capacity f Individual Consult DV / Hiring of PMIU-Assessme TF / B6208 or better school leadership a Post Open - National 15,572.00 0.00 Signed 2022-09-19 2022-10-19 2022-10-23 2023-02-27 2022-11-13 2023-02-27 2022-12-09 2023-12-09 ant Selection nt Specialist nd management support PK-RSU-SINDH-321849-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of Lead Project En TF / B6208 Post Limited 17,815.00 0.00 Completed 2022-10-20 2022-10-19 2022-10-27 2022-11-03 2022-11-02 2022-11-03 2022-11-04 2023-11-04 2023-11-26 nd project management ant Selection gineer for Civil Work (PMIU-S ELECT) PK-RSU-SINDH-322603-CS-IN DV / Hiring of Individual Cons Developing an effective and Individual Consult TF / B6208 Post Limited 5,085.00 0.00 Signed 2022-10-24 2022-10-27 2022-10-28 2022-12-15 2022-11-02 2022-11-30 2022-11-21 2022-12-21 ultant for Labour Manageme safe learning environment ant Selection nt Procedure Specialist PK-RSU-SINDH-331435-CS-IN Improving system capacity f Individual Consult Under Implement DV / Hiring of Continuous Pro IDA / 69730 or better school leadership a Post Open - National 16,301.00 0.00 2022-12-15 2022-12-05 2023-01-11 2023-02-01 2023-02-12 2024-02-12 ant Selection ation fessional Development Speci nd management support alist (PITE) PK-RSU-SINDH-331441-CS-IN Developing an effective and Individual Consult Under Implement IDA / 69730 Post Open - National 16,301.00 0.00 2022-12-15 2022-12-26 2023-01-11 2023-02-01 2023-02-17 2024-02-17 DV / Hiring of Project Enginee safe learning environment ant Selection ation r PK-RSU-SINDH-333910-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of Financial Mana TF / B6208 Post Limited 20,410.00 0.00 Canceled 2023-01-02 2023-01-05 2023-01-10 2023-01-19 2023-01-31 2023-01-13 2023-03-07 2024-03-06 nd project management ant Selection gement Specialist PK-RSU-SINDH-363792-CS-IN Monitoring and evaluation a Individual Consult DV / Hiring of Financial Mana TF / B6208 Prior Open - National 18,551.00 0.00 Under Review 2023-05-28 2023-06-05 2023-07-07 2023-07-28 2023-09-01 2024-08-31 nd project management ant Selection gement Specialist (FMS) PK-RSU-SINDH-365251-CS-IN Improving system capacity f Individual Consult DV / Hiring of Software Engin TF / B6208 or better school leadership a Post Open - National 12,804.00 0.00 Under Review 2023-06-15 2023-06-14 2023-08-03 2023-08-24 2023-09-28 2024-09-27 ant Selection eer nd management support Page 2 Plan de Passation de marchés I. Généralités 1. L'information sur le projet : Pays : Madagascar ; Emprunteur : République de Madagascar ; Nom de projet : Deuxième Projet de Gouvernance des Pêches et de Croissance Partagée du Sud-ouest de l’Océan Indien (SWIOFish2) Numéro du Crédit : P153370 Agence d’exécution du Projet : 2. Date d’approbation du Plan de passation de marchés par la Banque : 01 Février 2018 ; Révision : 09 Août 2018 ; 3. Date de notification du Plan Général de Passation de marchés : - ; 4. Période couverte par le Plan de Passation de marchés : Année 2018 II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable : Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le paragraphe 3.1 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) et sur la base de l'évaluation de la capacité de l'agence d’exécution : Méthode de Passation de Seuil de revue Commentaires marchés à priori 1. AOI – Ouvert ou Restreint (Biens) 2 000 000 Les montants 2. AON (Biens) 2 000 000 estimatifs des 3. AOI (Travaux) 10 000 000 marchés prévus 4. AON (Travaux) 10 000 000 sont au-dessous 5. AOI (Services) 2 000 000 des seuils. 6. UN -UNOPS (Biens) 2 000 000 Niveau de risque : 7. ED (Biens/Travaux) 2 000 000 « SUBSTANTIEL » 2. Pré-qualification (selon les dispositions des paragraphes 6.19 à 6.24 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable. 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 6.52 et 6.53 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable 4. Référence (s’il y en a) au Manuel d’exécution du projet / Manuel de Passation de marchés : Non Applicable 5. Tout autre arrangement spécial en passation de marchés : Non Applicable. 6. Allotissement de fournitures avec méthodes et calendrier : [Enumérer d’abord les allotissements qui nécessitent la revue préalable de la Banque, ensuite les autres allotissements] 1 2 3 4 5 6 7 8 9 Réf. Description Contrat Coût Approche/Méth Pré- Préféren Revue de la Date Commentair No estimatif ode de qualificati ce Banque (à prévue es sélection on national priori / à d’ouverture Oui / Non e posteriori) des Oui / Non soumission s MG- Matériels roulants (46Voitures : PM 1DSP – 2CEDP – 3SG – 3DGRHP 3 070 000 UNOPS Non Non Oui 01/07/2018 01/1 – 3RGPDD – 4ASH – 1USTA – 8 5CSP – 22 DRRHP – 2UGP) MG- PM Matériels roulants (20motos ; Non Non 59 000 UNOPS Non 01/07/2018 02/1 2USTA – 16UGL – 2UGP) 8 Matériels et équipement Informatiques (48 Ordinateurs de bureau – 45 Ordinateurs portables – 27 Onduleurs – Non Non Non MG- 4Stabilisateurs – 29Imprimantes PM AON/UNOP multifonctions – 52 Imprimantes 433 910 30/09/2018 03/1 S laser noir – 11Imprimantes laser 8 couleur – 29Photocopieuses – 10Vidéoprojecteurs – 10Appareils photo – 11GPS – 1Caméra – 32 Tablettes MG- PM Matériels et mobiliers de bureau Non Non Non 162 200 AON 30/09/2018 04/1 : 1DCI – 2USTA –8 UGL - 1UGP 8 MG- Commented [JM1]: 29 170 dans PPM d’aout PM Fournitures et articles de Non Non Non Commented [u2R2]: Omission de la ligne 47 170 DC 01/12/2018 05/1 bureau 4.1.3.2.1 de l’UGP d’un montant de 18.000USD 8 sur le PTBA 2018 MG- PM Non Non Non Consommables informatiques 73 170 DC 30/09/2018 06/1 8 MG- Kits d'équipements pour les PM enquêteurs (sac de couchage, Non Non Non 17 500 DC 15/10/2018 07/1 tente, torche, bottes, 8 imperméable) MG- Non Non Non Achat téléphone mobile pour la PM collecte de données au niveau 5 250 DC 01/12/2018 08/1 national 8 MG- Non Non Non Matériels d'échantillonnage PM (Blouse, gant, balance, pied a 1 000 DC 30/09/2018 09/1 coulisse…) 8 MG- Non Non Non Acquisition et installation d’un PM logiciel de suivi automatique 150 000 AON 01/12/2018 10/1 des captures (ERS); 8 MG- Non Non Non Dotation et moyens PM d'équipement pour les 48 000 DC 30/10/2018 11/1 membres du CSC 8 MG- Non Non Non PM Matériels de l'électrification 9 000 DC 30/10/2018 12/1 hors grille 8 MG- Non Non Non PM Equipements et outils de pêche 120 000 AON 01/10/2018 13/1 8 MG- Non Non Non Commented [JM3]: 115 000 dans PPM d’aout Outillage d'entretien d'engin et PM Commented [u4R4]: Après vérification du d'embarcation de pêche pour 60 000 AON 01/12/2018 14/1 PTBA Ligne 3.2.1.1.32 : il est prévu :12 lots à usage communautaire 8 5.000USD l’unité Appui à la mise à disposition Non Non Non MG- des équipements de base pour PM la sécurité des pêcheurs et de 165 000 AON 01/12/2018 15/1 leurs embarcations en mer 8 (gilet, miroir… pour la période transitoire) MG- Non Non Non PM Outils de valorisation 80 000 DC 01/12/2018 16/1 8 MG- Petits matériels de valorisation 80 000 DC Non Non Non 01/12/2018 PM 17/1 8 MG- Non Non Non Commented [JM5]: Combien de boites sont PM prévues ? Achat boites à plaintes 3 950 DC 30/09/2018 18/1 Commented [u6R6]: 79 boites à plaintes 8 suivant la ligne 3.2.3.4.4 du PTBA 2018 MG- Non Non Non PM Outillage pour les pépinières et 19 000 DC 01/12/2018 19/1 les reboisements (brouette,….) 8 MG- Non Non Non Renforcement de l'unité de PM gestion communautaire en 10 000 DC 01/12/2018 20/1 biens et équipements 8 MG- Acquisition, installation et test Non Non Non PM des biens et équipements 240 000 AON 01/12/2018 21/1 relatifs aux technologies hors 8 grille MG- Non Non Non PM Petit outillage et fournitures 417 DC 30/10/2018 22/1 d’atelier (unité) 8 MG- Non Non Non Construction des bureaux des 2 PM PIE de l'ASH en province : 60 000 DC 30/09/2018 23/1 Antsiranana et Morondava 8 Carénages du navire de Non Non Non MG- surveillance «Atsantsa », PM remplacement des appareils de 181 000 AON 30/08/2018 24/1 navigation/accessoires et pièces 8 de rechanges des moteurs auxiliaires MG- Non Non Non PM Carénage du navire de 76 000 DC 30/10/2018 25/1 surveillance "Telonify" 8 MG- Non Non Non PM Constructions pour les six (06) 420 000 AON 30/09/2018 26/1 DRRHP et huit (08) CIRRHP 8 MG- Non Non Non PM Construction de petits 350 000 AON 30/11/2018 27/1 débarcadères type ponton 8 Installation d'unités de Non Non Non fabriques de glace/chambres MG- froides fonctionnant avec des PM énergies renouvelables et 320 000 AON 30/11/2018 28/1 respectant l’environnement 8 pour maintenir la chaine de froid des produits halieutiques dès leur débarquement MG- Non Non Non PM Construction d'infrastructures 360 000 AON 01/12/2018 29/1 communautaires /communales 8 MG- Non Non Non Infrastructures d'électrification PM hors grille dans les 1 250 000 AON 01/12/2018 30/1 communautés pilotes 8 MG- Non Non Non PM Construction de bureau de 60 000 DC 30/07/2018 31/1 l'UGP centrale 8 7.858.197 TOTAL Biens – Equipements et Travaux III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans le paragraphe 3 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) : Méthode de sélection Seuil de Commentaires revue à priori 1. Méthode compétitive (firmes) 1 000 000 Les montants 2. Entente directe (firmes) 1 000 000 estimatifs des 3. Méthode compétitive (Consultant individuel) 300 000 contrats prévus sont 4. Entente directe (Consultant individuel) 300 000 au-dessous des seuils. Niveau de risque : « SUBSTANTIEL » 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de USD 150 000 par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 7.25 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016). 3. Tout autre arrangement spécial de Sélection de consultants : Non applicable 4. Tâches de consultation avec des méthodes de sélection et calendrier Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions Etude et analyse diagnostiques des MG-PM stratégies du secteur et des anciens 75 000 CI NON 01/05/2018 32/18 plans directeurs et élaboration du nouveau plan directeur Mise à jour de la Stratégie Nationale de MG-PM l’Aquaculture (Consultant national + 30 000 CI NON 30/08/2018 33/18 Réunions (1 consultation, 1 validation) Etude sur les procédures MG-PM administratives régissant l’accès aux 70 000 CI NON 30/07/2018 34/18 ressources et examen des options et recommandations (6 outils de gestion) Elaboration de la stratégie d'adaptation MG-PM du secteur pêche face au changement 10 000 CI NON 01/09/2018 35/18 climatique Amélioration de la base de données pour la déclaration des produits de la Commented [JM8]: Est-ce que l augmentation MG-PM pêche régionale (Base de données- 10 000 CI NON 30/08/2018 de 35 000 à 58 500 justifié par l’ajout de la 36/18 Tableau de bord-Système d'Information partie CFTP non prévue au PPM d’aout. Pêche : basé sur le Web, consultant) Commented [u9R9]: Faisant suite aux Amélioration de la base de données instructions de l’Equipe PPM de la BM, on a MG-PM pour les pêcheries industrielles 10 000 CI NON 30/09/2018 regroupée les études techniques et les études 37/18 Impacts pour l’OEPA régional et central – CFTP (consultant) Etude technique et étude d'impact et Enceinte Fénerive Est suivant les lignes du PTBA suivantes ; 2.1.2.3.6 – 2.1.2.3.7 – 2.1.2.5.2 environnemental et social de Etude groupée – 2.1.2.5.3 – 2.3.2.1.1 – 2.3.2.2.1.2 – 3.2.1.1.3 et MG-PM l'extension ou construction du bureau MG-PM 38-39-40- 3.2.1.1.4 58 500 SFQC NON 30/10/2018 92/18 régional et central de l’OEPA, de 41-55-56-62- réhabilitation du CFTP , Clôture de 63/18 Commented [JM7]: Est-ce que les études techniquesenv. Pour l’enceinte de la DRRHP de l’enceinte DRRHP Fenerive Fenerive ne pourrait pas être plutôt ajouter à la PA65 ? Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions Elaboration stratégie nationale de MG-PM recherches halieutiques (1 Consultant 50 000 CI NON 30/07/2018 42/18 international et 3 consultants nationaux) MG-PM Etude sur les mesures de gestion des 30 000 CI NON 30/07/2018 43/18 poulpes Avis scientifique pour la gestion des MG-PM pêcheries de langoustes, dans les sites 30 000 CI NON 30/07/2018 44/18 prioritaires Développement des points de référence MG-PM opérationnels pour la gestion de la 75 000 CI NON 30/07/2018 45/18 pêche crevettière Révision du système de suivi de la MG-PM pêche crevettière traditionnelle (PCT) 86 000 SFQC NON 30/07/2018 46/18 et élargissement à toutes les zones de pêche MG-PM Révision par les pairs des modèles 86 000 SFQC NON 30/07/2018 47/18 d'évaluation des stocks de crevettes Étude technique sur la stratégie de NON Commented [JM10]: 60 000 dans le PPM MG-PM surveillance et sur le fonctionnement 15 000 SFQC 30/07/2018 d’aout 49/18 du CSP Commented [u11R11]: Après vérification du Frais d'équipage durant les travaux de NON PTBA 2018 ligne 2.2.2.1.1, pour 2018 on a prévu MG-PM carénages (vivres+ indemnités + 25 000 CI 01/08/2018 01 étude pour 15.000USD le coût unitaire 50/18 carburants) MG-PM Assistance technique pour le suivi des 26 000 CI NON 30/09/2018 51/18 travaux de carénage de l'Atsantsa MG-PM NON Rédaction d’un plan national de lutte 52/18 52 000 CI 30/07/2018 contre la pêche INN Extension de l’ERS vers la flotte NON MG-PM nationale (Etude / subvention/ cout 50 000 CI 30/10/2018 53/18 interne CSP) Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions Etude et élaboration de mécanisme NON MG-PM structurel de plateforme de cogestion 50 000 CI 30/07/2018 54/18 des filières prioritaires (crabes, poulpes, langoustes, holothuries, crevettes) Études techniques et études d’impact SFQC NON Commented [JM13]: 50 000 dans le PPM environnemental et social pour la Etude groupée d’aout PA 65 Construction des Bureaux de six (06) 70 000 30/07/2018 MG-PM 57-58-85– Commented [u14R14]: Cette ligne regroupe DRRHP et neuf (09) CirRHP et d’un local 86/18 les études MG-PM 57-58-85 et 85 du PPM d’Août, pour bureau de l’UGP réf PTBA 2018 : 2.3.2.1.3 – 2.3.2.1.4 – 4.1.4.1.1 Etude sur l'identification des 180 000 SFQC NON et 4.1.4.1.2 bénéficiaires, du montant et des Commented [u12]: Après vérification PTBA modalités de transfert financier et sur Etude groupée 2018 lignes 2.3.2.1.3 et 2.3.2.1.4 c’est 08 MG-PM la détermination du montant minimal MG-PM 59-18 et 93/18 30/04/2018 de filet social pour les pêcheurs/acteurs MG-PM 60-18 filières affectés par les mesures de gestion MG-PM Recensement et identification des 20 000 CI NON 30/05/2018 61/18 bénéficiaires chaque année Etude sur l'amélioration des SFQC NON MG-PM embarcations existantes à partir des 270 000 01/11/2018 64/18 matériaux locaux bon marché et existants pour chaque ZUP Etude sur l'identification de techniques NON MG-PM modernes de pêche et de fabrication 60 000 SFQC 30/07/2018 65/18 d'engins de pêche adaptés pour chaque ZUP Prestataire formateur en construction 30 000 CI NON MG-PM et entretien des embarcations de pêche 30/11/2018 66/18 (par an) Prestataire formateur en construction 30 000 CI NON MG-PM et entretien des engins de pêche (par 30/08/2018 67/18 an) Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions Etude sur le circuit de 90 000 SFQC NON MG-PM commercialisation des produits des 30/03/2018 68/18 pêches par ZUP MG-PM ""Etude sur les accidents en mer de la 90 000 SFQC NON 30/04/2018 69/18 pêche à petite échelle""" ""Développement du système de SFQC NON MG-PM valorisation des produits halieutiques 60 000 30/03/2018 70/18 adaptées pour chaque ZUP""" " Étude de marché pour les produits de SFQC MG-PM pêche valorisés dans chaque région 90 000 NON 30/04/2018 71/18 ultra prioritaire (1 étude par région)" MG-PM Prestataire formateur en technique de CI NON 75 000 30/03/2018 72/18 valorisation (par an) MG-PM Prestataire formateur en technique CI NON 25 000 28/02/2018 73/18 commerciale (par an) MG-PM "Analyse des besoins en activités SFQC NON 74/18 alternatives adaptées pour chaque ZUP 210 000 30/05/2018 (exécutée par AGEX)" Evaluation des impacts socio- SFQC NON MG-PM économiques de la mise pratique des 90 000 30/09/2018 75/18 activités alternatives MG-PM Elaboration des Plans d'Action aux 60 000 CI NON 28/02/2018 76/18 restrictions de Ressources (PARAR) Détermination des outils financiers de NON PA40 gestion des revenus issus des filières et 60 000 CI activités alternatives MG – PM Cabinet d’étude ou d’une ONG pour 600 000 SFQC NON 117/18 assurer les missions de l’AGEX (PAP 01/06/2018 MELAKY) Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions MG – PM Cabinet d’étude ou d’une ONG pour 600 000 SFQC NON 117/18 assurer les missions de l’AGEX (PAP 01/06/2018 BATAN) MG – PM Cabinet d’étude ou d’une ONG pour 600 000 SFQC NON 117/18 assurer les missions de l’AGEX (PAP 01/06/2018 Baie d’Antongil) Elaboration de plan de formation des CI NON élus et acteurs communaux MG-PM (Fokontany, Mairie,…) pour la gestion 18 000 01/06/2018 77/18 et la pérennisation des infrastructures de pêches et communautaires MG-PM Elaboration du plan stratégique de CI NON 80 000 30/01/2018 78/18 développement local (PCD et PLD) Etat de lieux des petites infrastructures CI NON MG-PM de pêches et identifications des besoins 79/18 60 000 01/04/2018 des communautés cibles en petites infrastructures de pêche Etude de faisabilité technique des NON constructions d'infrastructures de pêche (APS & APD) (33 débarcadères, 8 MG-PM marchés couverts, 70 salles réunion et 550 000 SFQC 01/08/2018 80/18 hangars d'entretien des embarcations, 28 fabriques de glace) MG-PM Etude d'impact environnemental et 275 000 SFQC NON 01/08/2018 81/18 social Préparation du plan local NON Ligne d’activité à Commented [JM15]: Pas de montant? MG-PM d'électrification communautaire : étude CI 01/03/2018 retirer dans ce Commented [u16R16]: Omission de montant 82/18 et rapports PPM dans le PTBA réf 3.3.3.1.3 – Après consultation Gestion et mise en œuvre : évaluation NON de RC3, le type de coût CS est changé en OP car MG-PM cette activité fait partie d’objet de convention de la mise en place de l'électrification 15 000 CI 01/12/2018 83/18 avec l’ADER. De ce fait, cette ligne ne fera plus hors grille partie des études dans le PPM 2018 Réf. Description des missions Coût Approche/Méthode de Revue de la Date prévue Commentaires No. estimatif sélection Banque (à de priori / à soumission posteriori) des propositions MG-PM Gestion et mise en œuvre : Suivi 40 000 CI NON 15/10/2018 84/18 évaluation des bases de données MG-PM Enquête de situation de référence des SFQC NON 50 000 30/07/2018 87/18 bénéficiaires MG-PM Audit externe des comptes du Projet 15 000 SMC NON 01/12/2018 88/18 MG-PM Elaboration d'une stratégie du plan de CI NON 10 000 30/09/2018 89/18 communication du projet SWIOFish2 MG-PM Mise en place du site internet du projet CI NON 2 000 30/09/2018 90/18 SWIOFish2 MG-PM CI NON Assistance technique - maintenance 500 30/09/2018 91/18 TOTAL Consultances 5.264.000 IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier 1. Dans cette section, les activités de renforcement de capacité acceptées (quelques articles pourraient être des recommandations de CPAR) sont énumérées avec le calendrier No. Résultats escomptés / Description Coût Durée Date de Commentaire de l’activité estimatif estimative début s (jours) MG-FO Ateliers nationaux pour la 12.000 01-18 validation des textes d'application avec CRDA MG-FO Formation SLC (technique de 18.000 02-18 négociation, leadership etc.) MG-FO Tenir un atelier national relatif à 7.500 03-18 la communication de la nouvelle loi portant Code de la Pêche et de l'Aquaculture à Madagascar MG-FO Atelier national de préparation de 3.000 02 04-18 l'élaboration du nouveau plan directeur MG-FO Atelier national de validation du 6.000 01 05-18 plan directeur MG-FO Visite d'échange d'expérience en 40.000 06-18 matière de technique de production et d'exploitation aquacole marine (ex: grouper sp, algue marine, crabe) MG-FO Formation provinciale sur 27.000 07-18 nouvelles procédures de marquage, de délivrance des cartes pêcheurs et mareyeurs MG-FO Formation des cadres supérieurs 123.000 08-18 (6+6) dans la collecte des données et statistiques de pêche (formation FAO/ISSEA) MG-FO Formation des 10 enquêteurs en 2.000 09-18 méthodologie de collecte de données par téléphone mobile pour les 2 ZUP (DIANA et Analanjirofo; soit 5 enquêteurs/région) MG-FO Formation de 05 cadres 25.000 10-18 supérieurs dans l'analyse des données MG-FO Formation de 05 cadres 25.000 11-18 supérieurs en IT MG-FO Participation à des réunions et 10.000 12-18 ateliers régionaux per diem et hôtel et frais d'avion MG-FO Renforcement des 13-18 capacités des personnels 15.000 techniques de l'OEPA (économie des ressources naturelles et économie des pêches) MG-FO Ateliers régionaux sur la 36.000 14-18 stratégie nationale (pour les 6 ex- provinces) MG-FO Atelier national sur la stratégie 3.000 15-18 nationale MG-FO Formations et voyages d’échange 100.000 16-18 d’expérience et de la bonne pratique (renforcement des capacités, Ateliers de restitution et de validation des travaux de consultance, coûts des voyages, frais de participations, indemnités…) MG-FO Renforcement de capacité des 50.250 17-18 agents chercheurs (formations extérieures) MG-FO Participation à des forums de 52.500 18-18 recherche MG-FO Formation de l'équipe (média, 15.000 19-18 audio-visuel, design, PAO, site web, prog. éducatifs) MG-FO Renforcement de capacité des 5.000 20-18 membres du bureau de coordination pêche environnement (environnement pêche et mer) MG-FO Organisation des réunions 46.000 21-18 semestrielles MG-FO Formation en QMS d’une Autorité 14.300 22-18 Compétente par formateur international pour renforcement de capacités en Audit interne d’une Autorité compétente (Maitrise des documents et des enregistrements) MG-FO Formation en Informatique & 23-18 Base de données : Avec 24.000 formateur national : Informatique (bureautique et programmation) / Utilisation & gestion de base de données MG-FO Linguistique : Avec formateur 15.140 24-18 national : Anglais / Chinois MG-FO Formation en Aquaculture : Avec 22.640 25-18 formateur international : Technique d’élevage et gestion de risque / Méthode de contrôle appliquée dans divers système d’aquaculture (Diana 3 personnes; Melaky 7; Central 2) MG-FO Formation en système de 26-18 Biosécurité : Avec formateur 22.640 international : Biosécurité appliquée aux animaux aquatiques (Diana 3 personnes; Melaky 7; Central 2) MG-FO Formation en Système de 22.640 27-18 management de la QHSE Sanitaire : Avec formateur international : Hygiène et pré requis au niveau des établissements / Normes ISO sur la sécurité sanitaire des aliments / HACCP / Evaluation & analyse des risques MG-FO Formation en Gestion des crises : 28-18 Avec formateur international : 22.640 RASFF MG-FO Formation en Système de 20.200 29-18 certification : Avec formateur international : TRACES MG-FO Formation en Accord International 22.640 30-18 : Avec formateur international : Accord SPS&OMC MG-FO Formation en Science & 22.640 31-18 Technologie : Avec formateur international : Microbiologie des aliments et de l’eau / Toxicologie appliquées aux produits de la mer / Science & Technologie des aliments MG-FO Formation en Technique 2.830 32-18 d’analyse : Avec formateur national : Technique d’analyse de détection des maladies aquatiques MG-FO Formatio 22.640 33-18 n en Technique d’analyse et Technique d’échantillonnage : Avec formateur international MG-FO Formation en Administration : 34-18 Avec formateur national : 15.64 Formation en officier de police 0 judiciaire MG-FO Formation en Administration : 2.840 35-18 Avec formateur national : Procédures Banque Mondiale (Passation de marché, suivi- évaluation MG-FO Formation en QMS d’une Autorité 24.000 36-18 Compétente : Avec formateur international : Structuration et management Qualité d’une Autorité Compétente (ISO 17020) MG-FO Formation en Aquaculture : Avec 37-18 formateur international : 40.000 Aquaculture & environnement MG-FO Formation en Contrôles officiels : 38-18 Avec formateur international : 32.000 Echange d’expérience par jumelage régionale MG-FO Formation en Système de 39-18 management de la QHSE 8.000 Sanitaire : Avec formateur international : Audit de laboratoire selon ISO 17025 MG-FO Formation en Technique 8000 40-18 d’analyse : Avec formateur international : Technique d’analyse officielle MG-FO Formation en Technique 41-18 d’analyse : Avec formateur 8.000 international : Métrologie MG-FO Participation aux réunions et 134.000 42-18 groupes de travail CTOI et ORP MG-FO Réunion nationale (50 personnes 43-18 de 2 jours) de concertation sur la 6.000 pêche aux requins, oiseaux de mer, tortues MG-FO Participation aux réunions 100.500 44-18 régionales pour les termes minimaux des accords de pêche MG-FO Réunions de consultation 6.000 45-18 nationales sur la préparation des Mesures de conservation et de gestion (pour 6 réunions par an) MG- Formation sur l'identification des 8.500 FO46-18 espèces thonières et les techniques d'échantillonnage au débarquement MG-FO Formation sur la gestion des 8.500 47-18 données MG-FO Atelier de validation de nouveaux 75.000 48-18 PAP MG-FO Visite d'échange et d'expérience 31.000 49-18 sur l'utilisation du logiciel ERS MG-FO Formation du personnel à 60.600 50-18 l’utilisation et à l’exploitation de cet outil. MG-FO Renforcement de capacité et 51-18 formation des membres des CSC 24.000 MG-FO Ateliers de lancement régionaux 30.000 52-18 sur les plateformes de cogestion (crabes, poulpes, langoustes, holothuries, crevettes) dans les régions MG-FO Formations et remise à niveau au 112.500 53-18 niveau national des cadres MG-FO Formations et remise à niveau 100.000 54-18 des cadres à l'extérieur MG-FO Atelier de restitution de l'étude 55-18 sur l'identification des 20.000 bénéficiaires, du montant et des modalités de transfert financier et du filet social MG-FO Ateliers de validation des 3.000 56-18 référentiels (diplôme, certificat, attestation) MG-FO Formation des techniques 60.000 57-18 modernes de pêche MG-FO Formation en construction 60.000 58-18 et entretien d'engin de pêche MG-FO Formation sur les techniques 60.000 59-18 commerciales des produits des pêches MG-FO Atelier de restitution de l'étude 20.000 60-18 sur l'accidentologie MG-FO Visite d'échange dans le cadre de 90.000 61-18 la sécurité en mer et de la professionnalisation (Philippine, …) MG-FO Ateliers de validation régionale 62-18 (03) et nationale (01) de l'étude 16.000 diagnostic des techniques de valorisation MG-FO Voyage de partage d’expérience 63-18 dans les régions ou pays voisins, 90.000 où la formation et l’appui en valorisation ont été effectives et ont apporté des effets positifs MG-FO Formation des personnes dans la 64-18 communauté de pêcheurs (pêcheurs, femmes de pêcheur, jeunes sans emploi) en 72.000 techniques de valorisation (15 personnes formées par village) MG-FO Formation des acteurs pratiquant 72.000 65-18 les techniques de valorisation sur la gestion des activités commerciales, la prospection des marchés, les techniques de négociation et le marketing et conditionnement MG-FO Voyages d’échange d’expérience 16.000 66-18 pour les acteurs formés et ayant pratiqué la commercialisation au niveau d’un district littoral accompagnés des agents de la CirRHP/DRRHP/MRHP (1 par année par district) (50 acteurs par voyage) MG-FO Ateliers de restitution régionaux 67-18 et des ateliers de validation 24.000 nationale de l'étude diagnostic des besoins en activités alternatives MG-FO Voyages d’échange d’expérience 45.000 68-18 dans des pays semblables à Madagascar pour les bénéficiaires (Afrique australe, régions de la COI et en Asie) MG-FO Prestation à la formation des 50.000 69-18 cibles en activités alternatives MG-FO Formation des techniciens de 9.000 70-18 l’Administration (DRRHP et CirRHP) et l’UGL sur les techniques et le système de suivi de ces techniques (par région) MG-FO Formation des pêcheurs, femmes 480.000 15 71-18 de pêcheurs et jeunes dans les villages de pêcheurs en techniques de production appropriées pour chaque type d’activité alternative choisi (15j*8000) MG-FO Formation des pêcheurs, femmes 05 72-18 de pêcheurs et jeunes sans 100.000 emploi en techniques d’aquaculture (5 jours) MG-FO Formation et d'échange 90.000 73-18 d'expérience à l'étranger dans le cadre de l'aquaculture (algoculture, pisciculture, crabiculture,…) MG-FO Formation des acteurs pratiquant 80.000 04 74-18 les activités alternatives sur la gestion des activités commerciales, la prospection des marchés, les techniques de négociation et le marketing et conditionnement (4 jours) MG-FO Visites de la vitrine/ ferme école 72.000 75-18 pour les acteurs formés MG-FO Orientation des pêcheurs dans la 1.600 02 76-18 valorisation de leur biodiversité et les former en guide touristique MG-FO Sélection et formation des PF au 12.000 77-18 fonctionnement du MDGP MG-FO Ateliers de validation régionale 16.000 78-18 (03) et nationale (01) MG-FO Visite d’échange d’expérience 32.000 79-18 nationale (1 voyage par an par district) MG-FO Voyage de partage d’expérience 45.000 80-18 à l’étranger (01 voyage par an) MG-FO Séminaire/atelier international 70.000 81-18 (02 voyages par an) MG-FO Formation de courte durée à 45.000 82-18 l’étranger (01 voyage par an) MG-FO Réunions de sensibilisation et de 192.000 03 83-18 formation en éducation financière des petits pêcheurs et aquaculteurs à petite échelle (200 villages de pêcheurs) MG-FO Réunions de sensibilisation pour 64.000 01 84-18 la constitution en organisation appropriée des bénéficiaires du projet (200 villages de pêcheurs) MG-FO Promotion des services financiers 48.000 85-18 adéquats et adaptés à chaque zone d’intervention à travers des sensibilisations MG-FO Renforcement de capacité des 150.000 86-18 cadres et élus au niveau local MG-FO Renforcement de capacité des 9.000 87-18 UGL MG-FO Ateliers régionaux (03) et national 16.000 88-18 de validation MG-FO Atelier de réception locale de 4.000 89-18 l’infrastructure construite MG-FO Partage d'expérience à l'étranger 45.000 90-18 (2 missions par an) dans le cadre de la gestion communautaire des infrastructures de pêche MG-FO Formation des groupements de 8.000 91-18 pêcheurs pour être dans des comités de gestion et formation sur la gestion des infrastructures MG-FO Formation des groupements de 36.000 92-18 pêcheurs pour être dans des comités de gestion et formation sur la gestion des infrastructures MG-FO Formation des communautés 55.800 93-18 pilote sur les procédures réglementaires dans le cadre de l'électrification hors grille MG-FO Formation des communautés 90.000 94-18 pilotes à l'usage et à la gestion de l'électrification hors grille MG-FO Engagement communautaire 75.000 95-18 (IEC) dans le cadre de l'électrification hors grille MG-FO Gestion et mise en œuvre : 27.900 96-18 diffusion de connaissances MG-FO Participation à des ateliers de 10.000 97-18 partage MG-FO Formation modulaire spécifique 20.250 98-18 (langues, communication, informatique, …) MG-FO Formation modulaire (Gestion de 120.000 99-18 projet, suivi et évaluation, sauvegarde environnementale, techniques de négociations, SIG, …) MG-FO Formation de l'équipe (média, 37.500 100-18 audio-visuel, design, PAO, site web, prog. éducatifs) MG-FO Formation sur les procédures de 22.500 101-18 la Banque mondiale MG-FO Organisation des ateliers 17.000 102-18 MG-FO Formation relative à l'utilisation 11.400 103-18 de logiciel SE MG-FO Renforcement de capacité des 104-18 UGL sur le SE 7.500 MG-FO Atelier participatif de Suivi 105-18 Evaluation avec UGP- UGL- 3.000 MRHP-AGEX TOTAL Renforcement de capacité 4.396.730 PROCUREMENT Southern Africa : Second South West Indian Ocean Fisheries Governance and Shared Growth Project - Madagascar PLAN General Information Country: Southern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-04-06 Revised Plan Date(s): (comma delineated, leave blank 2023-05-22 if none) Project ID: P153370 GPN Date: Project Name: Second South West Indian Ocean Fisheries Governance and Shared Growth Project - Madagascar Loan / Credit No: IDA / Q9790, IDA / 59870, IDA / D1720, IDA / V0500, TF / A4588 MINISTRY OF HALIEUTIC RESSOURCES AND FISHERIES Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual A Bid Evaluation Repor Loan / Credit Market Approa Procurement Pr Prequalificatio High SEA/SH Process Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission Contract Compl Description Component Review Type Method Document Ty Amount ( mount (U t and Recommendati Signed Contract No. ch ocess n (Y/N) Risk Status n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes etion pe US$) S$) on for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MG-MRHP-28163-CW-RFB// Component 2. Strengthenin Open - Internation Single Stage - Two 2017-09-3 2017-10-2 2017-12-0 2018-02-2 2018-04-0 2018-10- MG-PM-11 / Carénages du n IDA / D1720 g capacities for priority fish Post Request for Bids 76,000.00 0.00 Canceled al Envelope 0 1 5 4 7 04 avire de surveillance «Teloni eries management fy », MG-MRHP-28164-CW-RFB// Component 3. Strengthenin MG-PM-12 / Construction d'i g capacities for engaging in Single Stage - Two 2017-11-3 2017-12-2 2018-02-0 2018-04-2 2018-06-0 2018-12- IDA / 59870 Post Request for Bids Open - National 200,000.00 0.00 Canceled nfrastructures communautai alternative fishing practices Envelope 0 1 4 6 7 04 res /communales and livelihoods activities MG-MRHP-28634-CW-RFB// MG-PM-105 / Carénages du Component 2. Strengthenin navire de surveillance «Atsa Open - Internation Single Stage - Two 2018-02-2 2019-01-2 2018-03-1 2018-04-2 2018-08-0 2018-09-1 2019-03- IDA / D1720 g capacities for priority fish Post Request for Bids 181,000.00 0.00 Canceled ntsa », remplacement des a al Envelope 8 8 4 8 2 3 12 eries management ppareils de navigation/accés soires et pièces de rechange s desmoteurs auxiliaires Component 3. Strengthenin MG-MRHP-28642-CW-RFB// g capacities for engaging in Single Stage - Two 2018-06-2 2018-07-1 2018-08-2 2018-11-1 2018-12-2 2019-06- MG-PM-107 / Rehabilitation IDA / 59870 Post Request for Bids Open - National 50,000.00 0.00 Canceled alternative fishing practices Envelope 9 3 7 6 8 26 du CFTP Nosy be and livelihoods activities MG-MRHP-28648-CW-RFB// Component 3. Strengthenin MG-PM-110 / Infrastructures g capacities for engaging in Single Stage - One 1,250,000.0 2018-04-3 2018-05-1 2018-06-2 2018-09-2 2019-03- IDA / V0500 Post Request for Bids Open - National 0.00 Canceled d'électrification hors grille d alternative fishing practices Envelope 0 0 4 5 0 19 ans les communautés pilote and livelihoods activities s MG-MRHP-100097-CW-RFQ Component 2. Strengthenin Request for Quot Single Stage - One 2019-02-1 2018-07-2 2019-04-1 2018-09-1 2019-10- / Carénages du navire de su IDA / D1720 g capacities for priority fish Post Limited 76,000.00 101,079.93 Completed ations Envelope 7 3 4 7 11 rveillance «Telonify » eries management MG-MRHP-28432-CW-RFB// Component 2. Strengthenin Open - Internation Single Stage - Two 2019-07-0 2019-07-1 2019-08-2 2019-11-1 2019-12-3 2020-06- MG-PM-101 / Extension ou c IDA / 59870 g capacities for priority fish Post Request for Bids 60,000.00 0.00 Canceled al Envelope 1 5 9 8 0 27 onstruction du bureau régio eries management nal OEPA : 03 MG-MRHP-28436-CW-RFB// Component 2. Strengthenin Open - Internation Single Stage - Two 2019-07-1 2019-07-2 2019-09-1 2019-12-0 2020-01-1 2020-07- MG-PM-102 / Construction d IDA / 59870 g capacities for priority fish Post Request for Bids 40,000.00 0.00 Canceled al Envelope 5 9 2 2 3 11 u bâtiment central de l'OEPA eries management : 01 MG-MRHP-28438-CW-RFB// Component 2. Strengthenin Open - Internation Single Stage - Two 2019-07-0 2019-07-1 2019-08-2 2019-11-1 2019-12-3 2020-06- MG-PM-103 / Mise en place IDA / 59870 g capacities for priority fish Post Request for Bids 100,000.00 0.00 Canceled al Envelope 1 5 9 8 0 27 d'infrastructure pour centre eries management de recherche CEDP MG-MRHP-119316-CW-RFB / Component 2. Strengthenin Construction bureaux USTA Single Stage - One 2019-08-0 2019-08-0 2019-09-1 2019-10-1 2019-11-2 2020-05- IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 46,000.00 0.00 Canceled au niveau des antennes (Ma Envelope 1 6 7 7 1 19 eries management hajanga et Toamasina) : 02 MG-MRHP-96947-CW-RFQ B IS / Carénages du navire de Component 2. Strengthenin surveillance «Atsantsa », re Request for Quot Single Stage - One 2019-07-0 2019-02-1 2019-09-2 2019-07-1 2020-03- IDA / D1720 g capacities for priority fish Post Limited 350,000.00 309,641.94 Completed mplacement des appareils d ations Envelope 7 1 6 2 24 eries management e navigation/accessoires et pièces de rechanges des mo teurs auxiliaires MG-MRHP-119317-CW-RFB / Component 2. Strengthenin Single Stage - One 2019-07-1 2019-07-2 2019-08-3 2019-09-3 2019-11-0 2020-05- Constructions pour les six (0 IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 420,000.00 0.00 Canceled Envelope 5 0 1 0 4 02 6) DRRHP et huit (08) CIRR eries management HP MG-MRHP-28643-CW-RFB// Component 3. Strengthenin MG-PM-108 / Construction d g capacities for engaging in Single Stage - Two 2019-08-0 2019-08-1 2019-09-2 2019-12-1 2020-01-3 2020-07- IDA / 59870 Post Request for Bids Open - National 350,000.00 0.00 Canceled e petites débarcadères type alternative fishing practices Envelope 1 5 9 9 0 28 ponton and livelihoods activities MG-MRHP-119318-CW-RFB / Travaux de construction et d Component 2. Strengthenin Single Stage - One 2019-07-1 2019-06-1 2019-07-2 2019-08-3 2019-07-2 2020-02-2 2020-06-0 2020-03-2 2020-08-2 2021-08- e la réhabilitation de l’ancie IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 130,900.00 126,080.50 Signed Envelope 5 8 0 1 3 2 9 8 0 25 n bureau-logement du DRRH eries management P Analanjorofo – Region Anal anjorofo MG-MRHP-119318BIS1-CW- Component 2. Strengthenin RFB / Travaux de constructio Single Stage - One 2019-07-1 2019-06-1 2019-07-2 2019-08-3 2019-07-2 2020-02-2 2020-06-0 2020-03-2 2020-07-0 2021-08- IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 58,400.00 89,364.09 Signed n d'un nouveau bureau-loge Envelope 5 8 0 1 4 2 9 8 4 25 eries management ment du DRRHP Anosy - Rég ion Anosy MG-MRHP-119318BIS2-CW- Component 2. Strengthenin RFB / Travaux de réhabilitati Single Stage - One 2019-07-1 2019-06-1 2019-07-2 2019-08-3 2019-07-2 2020-02-2 2020-06-0 2020-03-2 2020-06-2 2021-08- IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 62,700.00 95,221.17 Signed on du bureau de la CIRRHP Envelope 5 8 0 1 4 2 9 8 4 25 eries management Maroantsetra- District Maroa ntsetra MG-MRHP-119318BIS4-CW- Component 2. Strengthenin RFB / Travaux de constructio Single Stage - One 2019-07-1 2019-06-1 2019-07-2 2019-08-3 2019-07-2 2020-02-2 2020-06-1 2020-03-2 2020-08-1 2021-08- IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 58,600.00 43,216.11 Signed n d'un nouveau bureau-loge Envelope 5 8 0 1 5 2 2 8 8 25 eries management ment ASH Morondava - Régi on Menabe MG-MRHP-28640-CW-RFB// Component 2. Strengthenin Single Stage - Two 2018-06-1 2018-06-2 2018-08-1 2018-11-0 2018-12-1 2019-06- MG-PM-106 / Constructions IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 180,000.00 0.00 Canceled Envelope 5 9 3 2 4 12 pour les six ( 06) DRRHP et eries management huit (08 )CIRRHP MG-MRHP-170956-CW-DIR / Component 2. Strengthenin 2020-05-0 2020-06-1 2020-05-2 2020-06-1 2020-07-1 2020-09-2 2021-12- Travaux de construction du IDA / 59870 g capacities for priority fish Post Direct Selection Direct 76,500.00 95,680.97 Signed 8 1 2 2 0 2 07 DRRHP Androy - Région And eries management roy MG-MRHP-170965-CW-DIR / Component 2. Strengthenin Travaux de réhabilitation du 2020-05-0 2020-06-1 2020-05-2 2020-06-1 2020-07-1 2021-03-1 2021-12- IDA / 59870 g capacities for priority fish Post Direct Selection Direct 71,000.00 71,774.44 Signed bureau-logement du DRRHP 8 1 2 2 7 8 14 eries management Melaky - Région Melaky MG-MRHP-119318BIS5-CW- Component 2. Strengthenin RFB / Travaux de réhabilitati Single Stage - One 2019-07-1 2019-06-1 2019-07-2 2019-08-3 2019-07-2 2020-02-2 2020-03-2 2021-08- IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 71,000.00 0.00 Canceled on du bureau-logement du Envelope 5 8 0 1 6 2 8 25 eries management DRRHP Melaky - Région Mel aky MG-MRHP-119318BIS3-CW- Component 2. Strengthenin Single Stage - One 2019-07-1 2019-06-1 2019-07-2 2019-08-3 2019-07-2 2020-02-2 2020-03-2 2021-08- RFB / Travaux de constructio IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 76,500.00 0.00 Canceled Envelope 5 8 0 1 5 2 8 25 n du DRRHP Androy - Région eries management Androy MG-MRHP-28165-CW-RFB-B Component 4. Project mana Single Stage - One Terminate 2019-06-1 2019-06-1 2019-07-0 2019-08-1 2019-07-2 2019-09-1 2019-12-1 2019-10-2 2020-01-1 2021-03- IS // MG-PM-13 / Constructio IDA / 59870 Post Request for Bids Open - National 90,375.00 74,306.94 gement and coordination Envelope d 7 7 8 9 3 8 7 3 8 21 n de bureau de l'UGP central e MG-MRHP-28165-CW-RFB// Component 4. Project mana Single Stage - Two 2019-07-0 2019-06-1 2019-07-2 2019-07-1 2019-09-0 2019-07-2 2019-11-2 2020-01-0 2020-07- MG-PM-13 / Construction de IDA / 59870 Post Request for Bids Open - National 60,000.00 0.00 Canceled gement and coordination Envelope 1 7 2 8 5 3 5 6 04 bureau de l'UGP centrale MG-MRHP-203600-CW-RFB / Travaux de construction d'u Component 2. Strengthenin Single Stage - One 2020-11-2 2020-12-0 2020-12-1 2020-12-1 2021-01-0 2021-01-0 2021-02-0 2021-03-3 2021-03-1 2021-05-1 2021-07- n bureau de Circonscription IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 61,500.00 59,640.48 Signed Envelope 0 9 0 2 9 8 8 0 5 5 13 de l'Agriculture, de l'Elevage eries management et de la Pêche ( CirAEP) à A mbanja MG-MRHP-96947-CW-RFQ / Carénage du navire de surv Component 2. Strengthenin eillance "Atsantsa", remplac Request for Quot Single Stage - One 2019-03-0 2019-02-1 2019-05-2 2019-11- IDA / D1720 g capacities for priority fish Post Limited 181,000.00 0.00 Canceled ement des appareils de navi ations Envelope 8 1 8 24 eries management gation/ accessoires et pièce s de rechanges des moteurs auxiliaires. MG-MRHP-256406-CW-RFB / Request for Bids TRAVAUX DE CONSTRUCTIO Component 2. Strengthenin Single Stage - One - Works French C 2021-11-1 2021-12-0 2021-11-2 2021-12-0 2021-12-2 2022-01-0 2022-01-2 2022-01-2 2022-02-2 2022-03-1 2022-07- N D’UN BATIMENT ADMINIST IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 178,400.00 163,531.57 Signed Envelope ivil Law (French) 6 1 1 7 1 7 0 4 4 4 24 RATIF ASH TOLIARA - District eries management SPD Toliara Région ATSIMO AND REFANA MG-MRHP-262336-CW-RFQ Request for Quot Component 4. Project mana Request for Quot Single Stage - One Under Impl 2021-12-2 2023-01-1 2022-02-2 2022-08- / Construction de bureau de IDA / 59870 Post Open - National ations (Non Bank 90,375.00 0.00 gement and coordination ations Envelope ementation 0 0 1 20 l'UGP centrale (Relance) -SPD) MG-MRHP-119319-CW-RFB / Installation d'unités de fabri ques de glace/chambres froi Component 3. Strengthenin Request for Bids des fonctionnant avec des é g capacities for engaging in Single Stage - One - Works French C 2022-03-0 2022-03-0 2022-04-0 2022-05-0 2022-06-1 2022-12- IDA / 59870 Post Request for Bids Open - National 320,000.00 0.00 Canceled nergies renouvelables et res alternative fishing practices Envelope ivil Law (French) 2 7 6 6 0 07 pectant l’environnement po and livelihoods activities SPD ur maintenir la chaîne de fro id des produits halieutiques dès leur débarquement : 04 MG-MRHP-119321-CW-RFB / Construction de hangars ave c des matériaux locaux pour Component 3. Strengthenin entretenir les moteurs, les e g capacities for engaging in Single Stage - One 2021-08-0 2021-08-1 2021-09-2 2021-10-2 2021-11-2 2022-05- IDA / 59870 Post Request for Bids Open - National 240,000.00 0.00 Canceled mbarcations et des engins d alternative fishing practices Envelope 6 1 2 2 6 25 e pêche autorisés et d'une b and livelihoods activities ase de réunion, sensibilisati on et de structuration des ut ilisateurs petites infrastructu res de pêche : 08 MG-MRHP-28645-CW-RFB// Component 3. Strengthenin Request for Bids Pending Im MG-PM-109 / Construction d' g capacities for engaging in Single Stage - Two - Small Works SP 2022-08-0 2022-08-1 2022-09-2 2022-12-1 2023-01-3 2023-07- IDA / 59870 Post Request for Bids Open - National 600,000.00 0.00 plementati infrastructures communauta alternative fishing practices Envelope D (1 envelope pr 1 5 9 9 0 29 on ires /communales : 60 and livelihoods activities ocess) MG-MRHP-119320-CW-RFB / Component 3. Strengthenin Request for Bids Pending Im Construction de marchés co g capacities for engaging in Single Stage - One - Small Works SP 2022-05-0 2022-05-0 2022-06-1 2022-07-1 2022-08-2 2023-02- IDA / 59870 Post Request for Bids Open - National 300,000.00 0.00 plementati uverts aux produits halieutiq alternative fishing practices Envelope D (1 envelope pr 3 8 9 9 3 19 on ues : 10 and livelihoods activities ocess) MG-MRHP-119324-CW-RFB / Component 3. Strengthenin Request for Bids Pending Im Infrastructures d'électrificati g capacities for engaging in Single Stage - One - Small Works SP 2022-04-3 2022-05-0 2022-06-1 2022-07-1 2022-08-2 2023-02- TF / A4588 Post Request for Bids Open - National 300,000.00 0.00 plementati on hors grille dans les comm alternative fishing practices Envelope D (1 envelope pr 0 5 6 6 0 16 on unautés pilotes : 10 and livelihoods activities ocess) MG-MRHP-28632-CW-RFB// Component 2. Strengthenin MG-PM-104 / Construction d Single Stage - Two 2019-07-0 2019-07-1 2019-08-2 2019-12-0 2020-01-1 2020-07- IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 60,000.00 0.00 Canceled es bureaux des 2 PIE de l'AS Envelope 1 5 9 3 4 12 eries management H en province : Antsiranana et Morondava Request for Bids MG-MRHP-127603-CW-RFB / Component 2. Strengthenin Pending Im Single Stage - One - Small Works SP 2022-07-0 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2023-05- Construction du siège de l'A IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 60,000.00 0.00 plementati Envelope D (1 envelope pr 1 2 2 2 6 05 SH centrale sis à Antananari eries management on ocess) vo Page 1 MG-MRHP-292931-CW-RFB / Construction des bâtiments Component 3. Strengthenin Request for Bids du kiosque de pré-électrifica g capacities for engaging in Single Stage - One - Small Works SP Under Impl 2022-05-1 2022-05-1 2022-05-1 2022-05-1 2022-06-1 2022-06-2 2022-07-1 2022-07-1 2022-08-2 2022-12- IDA / 59870 Post Request for Bids Open - National 347,450.00 0.00 tion et du «Complexe-pêche alternative fishing practices Envelope D (1 envelope pr ementation 2 2 7 6 6 0 6 5 0 18 » dans les villages de Fontsi and livelihoods activities ocess) maro et Rantohely, Région A nalanjirofo répartis en 2 lots MG-MRHP-296929-CW-RFB / Constructions des Bureaux a dministratifs de l’Autorité Sa Request for Bids nitaire Halieutique (ASH) da Component 2. Strengthenin Single Stage - One - Works French C Under Impl 2022-06-1 2022-06-1 2022-06-2 2022-06-2 2022-07-2 2022-08-1 2022-09-2 2023-02- ns la Région Vatovavy Fitovi IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 362,500.00 0.00 Envelope ivil Law (French) ementation 5 7 0 0 0 9 3 20 nany, District Manakara, Co eries management SPD mmune Manakara, Village M angarivotra et au District de Mananjary, Commune Mana njary, Village Marofinaritra ( 2 Lots) MG-MRHP-297986-CW-RFB / TRAVAUX DE CONSTRUCTIO Component 3. Strengthenin Request for Bids N DES BATIMENTS DU KIOS g capacities for engaging in Single Stage - One - Works French C 2,745,000.0 Under Impl 2022-06-1 2022-10-0 2022-06-2 2022-10-1 2022-07-2 2022-08-2 2022-09-2 2023-02- QUE DE PRE-ELECTRIFICATI IDA / 59870 Post Request for Bids Open - National 0.00 alternative fishing practices Envelope ivil Law (French) 0 ementation 6 7 1 0 1 0 4 21 ON ET DU « COMPLEXE-PEC and livelihoods activities SPD HE » DANS LE DISTRICT D’A MBILOBE, ET DANS LE DISTR ICT DE NOSY BE REPARTIS E N HUIT (08) LOTS MG-MRHP-307513-CW-RFB- Component 3. Strengthenin Request for Bids BIS / Travaux de constructio Pending Im g capacities for engaging in Single Stage - One - Works French C 2022-09-2 2022-10-0 2022-11-0 2022-12-0 2023-01-0 2023-05- n du bâtiment de Kiosque et IDA / 59870 Post Request for Bids Open - National 558,200.00 0.00 plementati alternative fishing practices Envelope ivil Law (French) 9 4 3 3 7 07 du complexe pêche Aniribe on and livelihoods activities SPD Mananara-Nord et Antoraka Maroantsetra répartis en 2 l ots MG-MRHP-320141-CW-RFB / Construction de Bâtiment ab Component 3. Strengthenin Request for Bids ritant la machine à glace rep g capacities for engaging in Single Stage - One - Works French C Under Impl 2022-10-2 2022-11-3 2022-10-2 2022-12-0 2022-11-2 2022-12-2 2023-01-2 2023-05- artis en 5 Lots dans les villa IDA / 59870 Post Request for Bids Open - National 601,000.00 0.00 alternative fishing practices Envelope ivil Law (French) ementation 1 0 6 6 5 5 9 29 ges d’Antanambao Mandrisy and livelihoods activities SPD , Hoalampano, Tampolo, Fah ambahy, Itanjona dans le dis trict de Mananara nord) MG-MRHP-320162-CW-RFB / TRAVAUX DE CONSTRUCTIO Component 3. Strengthenin Request for Bids N DES BATIMENTS DU KIOS g capacities for engaging in Single Stage - One - Works French C Under Impl 2022-10-2 2022-11-2 2022-10-2 2022-12-0 2022-11-2 2022-12-2 2023-01-2 2023-05- IDA / 59870 Post Request for Bids Open - National 852,900.00 0.00 QUE DE PRE-ELECTRIFICATI alternative fishing practices Envelope ivil Law (French) ementation 1 8 6 9 5 5 9 29 ON ET DU « COMPLEXE-PEC and livelihoods activities SPD HE » DANS LE DISTRICT D’A MBANJA REPARTIS EN TROIS (03) LOTS MG-MRHP-320156-CW-RFB / Travaux de construction des Component 3. Strengthenin Request for Bids bâtiments du kiosque de pré g capacities for engaging in Single Stage - One - Works French C Under Impl 2022-10-2 2022-10-2 2022-10-2 2022-10-3 2022-11-2 2022-11-2 2022-12-2 2023-01-2 2023-06- -électrification et du « Comp IDA / 59870 Post Request for Bids Open - National 622,000.00 0.00 alternative fishing practices Envelope ivil Law (French) ementation 1 7 6 1 5 8 5 9 28 lexe-pêche » dans les villag and livelihoods activities SPD es d'Ambalahonko et Ampas imandoro district de Maintir ano repartis en 2 lots MG-MRHP-320151-CW-RFB / Request for Bids CONSTRUCTIONS DES BURE Component 2. Strengthenin Pending Im Single Stage - One - Works French C 2022-10-2 2022-10-2 2022-11-2 2022-12-2 2023-01-2 2023-05- AUX ADMINISTRATIFS DE L'A IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 975,000.00 0.00 plementati Envelope ivil Law (French) 1 6 5 5 9 29 SH ET DE DESP (Ex-OEPA) A eries management on SPD NTANANARIVO repartis en 2 Lots MG-MRHP-332561-CW-RFB / Travaux de construction des Request for Bids Bureaux de la circonscriptio Component 2. Strengthenin Pending Im Single Stage - One - Works French C 2023-01-1 2023-01-1 2023-02-1 2023-03-1 2023-04-2 2023-08- n en charge de la pèche et d IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 708,427.00 0.00 plementati Envelope ivil Law (French) 0 5 4 6 0 18 e l’économie bleu et l’anten eries management on SPD ne du centre de la surveillan ce des pêches à Maintirano, Région Melaky MG-MRHP-337958-CW-RFB / Component 3. Strengthenin Request for Bids Construction de Bâtiment ab g capacities for engaging in Single Stage - One - Small Works SP Under Impl 2023-01-2 2023-02-0 2023-02-0 2023-02-0 2023-03-0 2023-03-1 2023-03-2 2023-07- ritant la chambre froide dan IDA / 59870 Post Request for Bids Open - National 410,000.00 0.00 alternative fishing practices Envelope D (1 envelope pr ementation 7 3 1 6 3 3 3 21 s le village de RANTABE dan and livelihoods activities ocess) s le district de MAROANTSET RA, Région ANALANJIROFO MG-MRHP-337965-CW-RFB / Component 3. Strengthenin Request for Bids CONSTRUCTION DES DEUX ( Pending Im g capacities for engaging in Single Stage - One - Works French C 2023-01-3 2023-02-0 2023-03-0 2023-03-1 2023-03-2 2023-07- 02) MARCHES COUVERTS D IDA / 59870 Post Request for Bids Open - National 250,000.00 0.00 plementati alternative fishing practices Envelope ivil Law (French) 1 5 7 7 5 23 ANS LE DISTRICT DE MANAN on and livelihoods activities SPD ARA NORD REPARTIE EN DE UX (02) LOTS Request for Bids MG-MRHP-262336-BIS-CW- Component 4. Project mana Single Stage - One - Works French C Under Impl 2023-01-2 2023-01-1 2023-02-0 2023-02-0 2023-03-0 2023-03-1 2023-03-2 2023-07- RFQ / Construction de burea IDA / 59870 Post Request for Bids Open - National 90,375.00 0.00 gement and coordination Envelope ivil Law (French) ementation 9 0 3 8 5 5 3 21 u de l’UGP centrale (Relance SPD ) MG-MRHP-340927-CW-RFB / Travaux de construction des Component 3. Strengthenin Request for Bids bâtiments du kiosque de pré Pending Im g capacities for engaging in Single Stage - One - Works French C 2023-02-1 2023-02-1 2023-03-2 2023-04-1 2023-04-2 2023-08- électrification et du "Comple IDA / 59870 Post Request for Bids Open - National 222,300.00 0.00 plementati alternative fishing practices Envelope ivil Law (French) 4 9 1 1 8 26 xe pêche" dans le village d' on and livelihoods activities SPD Andranonabo, Commune Anj iabe ambony, District d'Amb ilobe (RELANCE) MG-MRHP-344175-CW-RFB / Request for Bids Travaux de construction des Component 2. Strengthenin Single Stage - One - Small Works SP 1,352,000.0 Under Impl 2023-02-2 2023-03-1 2023-03-0 2023-03-1 2023-03-3 2023-04-1 2023-04-1 2023-08- bâtiments Administratifs du IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 0.00 Envelope D (1 envelope pr 0 ementation 4 1 1 5 1 0 4 12 MPEB dans les régions de D eries management ocess) IANA- MELAKY- ANOSY repar tie en 04 lots MG-MRHP-344184-CW-RFB / Request for Bids Travaux de construction des Component 2. Strengthenin Single Stage - One - Works French C Under Impl 2023-02-2 2023-03-1 2023-03-0 2023-04-1 2023-03-3 2023-04-1 2023-04-1 2023-08- bâtiments Administratifs du IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 620,000.00 0.00 Envelope ivil Law (French) ementation 4 1 1 1 1 0 4 12 MPEB dans les régions de B eries management SPD OENY et ATSIMO ANTSINANA NA repartie en 02 lots MG-MRHP-344311-CW-DIR / Travaux additionnels de con Component 2. Strengthenin Request for Quot Pending Im struction du bureau, de Han 2023-04-0 2023-04-2 2023-05-0 2023-08- TF / A4588 g capacities for priority fish Post Direct Selection Direct - National ations (Non Bank 230,000.00 0.00 plementati gar pour la vedette de la bri 7 7 3 31 eries management -SPD) on gade du CSP Analanjirofo, et mise en place d’un point d’eau autonome par Entrepr ise FITALIA Request for Bids MG-MRHP-127600-CW-RFB / Component 2. Strengthenin Pending Im Single Stage - One - Small Works SP 2023-05-0 2023-05-0 2023-06-0 2023-06-2 2023-07-1 2023-09- Renforcement du CDA - Con IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 36,850.00 0.00 plementati Envelope D (1 envelope pr 2 7 6 7 1 29 struction puits et réhabilitati eries management on ocess) on clôture CDA MG-MRHP-337960-CW-RFB / Travaux de construction des Component 3. Strengthenin Request for Bids bâtiments abritant la machi g capacities for engaging in Single Stage - One - Small Works SP Under Impl 2023-05-0 2023-05-0 2023-05-0 2023-05-0 2023-06-0 2023-06-1 2023-07-0 2023-09- ne à glace dans les villages IDA / 59870 Post Request for Bids Open - National 357,400.00 0.00 alternative fishing practices Envelope D (1 envelope pr ementation 3 3 3 9 2 6 7 29 de Maintimbato, Mahasoa, A and livelihoods activities ocess) mbodipaka, Masindrano da ns le district de Maroantsetr a repartis en 4 lots MG-MRHP-337959-CW-RFB / Component 3. Strengthenin Request for Bids Travaux de construction des g capacities for engaging in Single Stage - One - Works French C Under Impl 2023-04-2 2023-04-2 2023-04-2 2023-05-2 2023-05-2 2023-06-1 2023-07-1 2023-09- bâtiments abritant la machi IDA / 59870 Post Request for Bids Open - National 198,000.00 0.00 alternative fishing practices Envelope ivil Law (French) ementation 9 8 9 2 9 2 0 29 ne à glace et magasin de st and livelihoods activities SPD ockage dans le district de N osy be répartis en 2 lots GOODS Activity Reference No. / Bid Evaluation Repor Loan / Credit Market Approa Procurement Pr Prequalificatio Estimated A Actual Amoun Process St Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission Description Component Review Type Method t and Recommendati Signed Contract Contract Completion No. ch ocess n (Y/N) mount (US$) t (US$) atus n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes on for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MRHP-28121-GO-UN// M Component 2. Strengthenin UN Agencies (Dir 2017-09-3 2017-10-2 2017-12-2 2018-06-2 G-PM-01 / Matériels et équip IDA / 59870 g capacities for priority fish Post Direct 315,310.00 0.00 Canceled ect) 0 1 3 1 ements informatiques et bur eries management eautiques MG-MRHP-28129-GO-RFB// Component 2. Strengthenin MG-PM-02 / Kits d'équipeme Open - Internation Single Stage - Two 2017-10-1 2017-11-0 2017-12-1 2018-03-0 2018-04-1 2018-10-1 IDA / D1720 g capacities for priority fish Post Request for Bids 17,500.00 0.00 Canceled nts pour les enquêteurs (sa al Envelope 5 5 7 8 9 6 eries management c de couchage, tente, torche , bottes, impermeable) MG-MRHP-28136-GO-UN//M Component 2. Strengthenin UN Agencies (Dir Pending Imp 2017-09-3 2017-10-2 2017-12-2 2018-06-2 G-PM-03 / Acquisition de Vé IDA / 59870 g capacities for priority fish Post Direct 1,830,000.00 0.00 ect) lementation 0 1 3 1 hicule eries management MG-MRHP-28157-GO-RFB// Component 2. Strengthenin Open - Internation Single Stage - Two 2017-10-3 2017-11-2 2018-01-0 2018-03-2 2018-05-0 2018-11-0 MG-PM-05 / Acquisition de fo IDA / 59870 g capacities for priority fish Post Request for Bids 29,170.00 0.00 Canceled al Envelope 0 0 4 6 7 3 urnitures et articles de bure eries management au MG-MRHP-28158-GO-UN//M Component 2. Strengthenin UN Agencies (Dir Pending Imp 2017-09-3 2017-10-2 2017-12-2 2018-06-2 G-PM-06 / Acquisition de Mot IDA / 59870 g capacities for priority fish Post Direct 59,000.00 0.00 ect) lementation 0 1 3 1 o eries management MG-MRHP-28159-GO-UN//M Component 2. Strengthenin UN Agencies (Dir 2017-10-1 2017-11-0 2018-01-0 2018-07-0 G-PM-07 / Acquisition de Dro IDA / D1720 g capacities for priority fish Post Direct 5,000.00 0.00 Canceled ect) 6 6 8 7 ne pour surveillance et contr eries management ôle MG-MRHP-28160-GO-RFB// Component 2. Strengthenin Open - Internation Single Stage - Two 2017-10-3 2017-11-2 2018-01-0 2018-03-2 2018-05-0 2018-11-0 MG-PM-08 / Acquisition de M IDA / 59870 g capacities for priority fish Post Request for Bids 120,000.00 0.00 Canceled al Envelope 0 0 4 6 7 3 atériels et Mobiliers de bure eries management au MG-MRHP-28161-GO-RFB// MG-PM-09 / Appui à la mise Component 3. Strengthenin à disposition des équipemen g capacities for engaging in Open - Internation Single Stage - Two 2017-11-1 2017-12-0 2018-01-2 2018-04-1 2018-05-2 2018-11-1 IDA / 59870 Post Request for Bids 65,000.00 0.00 Canceled ts de base pour la sécurité d alternative fishing practices al Envelope 5 6 0 1 3 9 es pêcheurs et de leurs emb and livelihoods activities arcations en mer (gilet, miro ir... pour la période transitoir e) MG-MRHP-28162-GO-RFB// Component 2. Strengthenin Single Stage - One 2017-11-1 2017-12-0 2018-01-2 2018-02-1 2018-04-0 2018-09-2 MG-PM-10 / Acquisition de C IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 25,170.00 0.00 Canceled Envelope 5 6 0 9 2 9 onsommables informatiques eries management (Lot) MG-MRHP-28397-GO-RFB// Component 2. Strengthenin MG-MP-89 / Acquisition et in Open - Internation Single Stage - Two 2018-06-1 2018-06-2 2018-08-1 2018-11-0 2018-12-1 2019-06-1 IDA / D1720 g capacities for priority fish Post Request for Bids 150,000.00 0.00 Canceled stallation d'un logiciel de sui al Envelope 5 9 3 2 4 2 eries management vi automatique des captures (ERS) MG-MRHP-28401-GO-RFB// Component 3. Strengthenin MG-PM-90 / Matériels de bur g capacities for engaging in Open - Internation Single Stage - Two 2018-06-1 2018-06-2 2018-08-1 2018-11-0 2018-12-1 2019-06-1 eau du CFTP (06 lots compo IDA / 59870 Post Request for Bids 6,000.00 0.00 Canceled alternative fishing practices al Envelope 5 9 3 2 4 2 sés de table de bureau, chai and livelihoods activities se de bureau, chaise visiteu se et armoire ) MG-MRHP-28406-GO-RFB// MG-PM-93 / Acquisition des Component 3. Strengthenin équipements de base pour l g capacities for engaging in Open - Internation Single Stage - Two 2018-01-3 2018-02-1 2018-03-3 2018-06-1 2018-07-3 2019-01-2 IDA / 59870 Post Request for Bids 100,000.00 0.00 Canceled a sécurité des pêcheurs et d alternative fishing practices al Envelope 0 3 0 9 1 7 e leurs embarcations en mer and livelihoods activities (gilet, miroir... pour la périod e transitoire) MG-MRHP-28415-GO-RFB// Component 3. Strengthenin MG-PM-96 / Acquisition d'out g capacities for engaging in Single Stage - Two 2018-03-3 2018-04-1 2018-05-2 2018-08-1 2018-09-2 2019-03-2 IDA / 59870 Post Request for Bids Open - National 19,000.00 0.00 Canceled illage pour les pépinières et alternative fishing practices Envelope 0 3 8 7 8 7 les reboisements (brouette,. and livelihoods activities ...) Page 2 MG-MRHP-28431-GO-RFB// MG-PM-100 / Acquisition de Component 3. Strengthenin mobiliers de bureau pour Ge g capacities for engaging in Single Stage - Two 2018-05-1 2018-05-2 2018-07-1 2018-10-0 2018-11-1 2019-05-1 stion et mise en œuvre : (0 IDA / V0500 Post Request for Bids Open - National 40,000.00 0.00 Canceled alternative fishing practices Envelope 5 9 3 2 3 2 3 lots composés de 01 table and livelihoods activities de bureau, 01 chaise de bur eau, 02 chaises visiteurs et 01 armoire de rangement se mi vitré ) MG-MRHP-23399-GO-UN / A Component 2. Strengthenin UN Agencies (Dir 2017-08-1 2017-09-0 2017-11-0 2018-05-0 chat de lot de Matériel infor IDA / Q9790 g capacities for priority fish Post Direct 201,660.00 0.00 Canceled ect) 5 5 7 6 matique (Année 2017) eries management Component 3. Strengthenin MG-MRHP-85764-GO-RFQ // g capacities for engaging in Request for Quot Single Stage - One 2018-12-1 2019-04-1 2019-10-1 MG-PM 18/18 / Achat de 79 IDA / 59870 Post Limited 3,950.00 0.00 Canceled alternative fishing practices ations Envelope 5 4 1 boites à plaintes and livelihoods activities MG-MRHP-28404-GO-RFB// Component 3. Strengthenin MG-PM-91 / Acquisition d'éq g capacities for engaging in Open - Internation Single Stage - Two 2019-07-1 2019-07-3 2019-09-1 2019-12-0 2020-01-1 2020-07-1 IDA / 59870 Post Request for Bids 320,000.00 0.00 Canceled uipements et outils de pêch alternative fishing practices al Envelope 6 0 3 3 4 2 e and livelihoods activities MG-MRHP-28405-GO-RFB// Component 3. Strengthenin MG-PM-92 / Acquisition d'out g capacities for engaging in Open - Internation Single Stage - Two 2019-07-0 2019-07-1 2019-08-2 2019-11-1 2019-12-3 2020-06-2 IDA / 59870 Post Request for Bids 185,000.00 0.00 Canceled illage d'entretien d'engin et alternative fishing practices al Envelope 1 5 9 8 0 7 d'embarcation de pêche pou and livelihoods activities r usage communautaire MG-MRHP-119305-GO-RFQ / Component 3. Strengthenin Appui à l'acquisition de mat g capacities for engaging in Request for Quot Single Stage - One 2019-07-0 2019-08-3 2020-02-2 IDA / 59870 Post Limited 100,000.00 0.00 Canceled ériels de sécurité aux pêche alternative fishing practices ations Envelope 6 1 7 urs et communauté de pêch and livelihoods activities eurs : 2000 Component 3. Strengthenin MG-MRHP-28410-GO-RFB// g capacities for engaging in Open - Internation Single Stage - Two 2018-05-1 2018-05-2 2018-07-1 2018-10-0 2018-11-1 2019-05-1 MG-PM-94 / Acquisition d'out IDA / 59870 Post Request for Bids 80,000.00 0.00 Canceled alternative fishing practices al Envelope 5 9 3 2 3 2 ils de valorisation and livelihoods activities MG-MRHP-28411-GO-RFB// Component 3. Strengthenin MG-PM-95 / Acquisition des g capacities for engaging in Open - Internation Single Stage - Two 2019-07-0 2019-07-1 2019-08-2 2019-11-1 2019-12-3 2020-06-2 IDA / 59870 Post Request for Bids 80,000.00 0.00 Canceled petits matériels de valorisati alternative fishing practices al Envelope 1 5 9 8 0 7 on and livelihoods activities Component 3. Strengthenin MG-MRHP-119309-GO-RFQ / g capacities for engaging in Request for Quot Single Stage - One 2019-06-2 2019-08-1 2019-07-1 2020-02-1 2019-08-1 IDA / 59870 Post Open - National 5,250.00 7,885.75 Completed Achat boites à plaintes : 105 alternative fishing practices ations Envelope 3 8 6 4 4 and livelihoods activities Component 3. Strengthenin MG-MRHP-119311-GO-RFQ / g capacities for engaging in Request for Quot Single Stage - One 2019-07-2 2019-10-0 2019-09-1 2020-01-1 2020-03-1 2020-02-0 Achat puce et téléphone por IDA / 59870 Post Limited 5,250.00 11,213.00 Completed alternative fishing practices ations Envelope 0 9 4 1 2 1 table : 105 and livelihoods activities MG-MRHP-28121-GO-UN// M Component 2. Strengthenin Request for Prop Single Stage - One 2019-07-3 2019-09-1 2019-08-2 2019-10-0 2019-10-0 2019-11-0 2019-11-0 2020-04-1 2019-12-1 2020-06-1 2020-06-1 2020-09-2 G-PM-01-2 / Matériels inform IDA / 59870 g capacities for priority fish Post Open - National 156,370.00 141,053.48 Completed osals Envelope 1 4 1 9 2 8 1 5 3 0 0 8 atiques 2019 eries management MG-MRHP-86177-GO-RFQ// Component 2. Strengthenin MG-PM 08/18 / Achat téléph Request for Quot Single Stage - One 2019-08-2 2019-07-2 2020-01-0 2019-09-0 2020-07-0 2019-09-2 IDA / V0500 g capacities for priority fish Post Limited 10,500.00 10,073.72 Completed one mobile pour la collecte ations Envelope 4 4 6 4 4 5 eries management de données au niveau natio nal MG-MRHP-28160-GO-RFB// Component 2. Strengthenin Request for Quot Single Stage - One 2019-07-2 2019-08-2 2019-09-1 2019-09-0 2020-03-1 2019-09-1 MG-PM-08-2 / Matériels et m IDA / 59870 g capacities for priority fish Post Limited 33,200.00 19,057.68 Completed ations Envelope 0 9 4 5 2 0 obiliers de bureau 2019 eries management MG-MRHP-28161-GO-RFB// MG-PM-09-2 / Appui à la mis Component 3. Strengthenin e à disposition des équipem g capacities for engaging in Single Stage - One 2019-07-1 2019-09-1 2019-07-2 2019-10-0 2019-08-3 2019-11-0 2019-09-3 2019-11-0 2020-05-0 ents de base pour la sécurit IDA / 59870 Post Request for Bids Open - National 330,000.00 0.00 Canceled alternative fishing practices Envelope 5 6 0 9 1 8 0 4 2 é des pêcheurs et de leurs e and livelihoods activities mbarcations en mer (gilet, miroir… pour la période tran sitoire) : 3300 MG-MRHP-28161 BIS-GO-RF Component 3. Strengthenin B // MG-PM-09-2 / Acquisitio g capacities for engaging in Single Stage - One 2019-12-2 2019-12-3 2019-12-2 2019-12-3 2020-01-2 2020-01-3 2020-02-1 2020-04-0 2020-03-0 2020-04-2 2020-06-0 n de 3300 kits de sécurité e IDA / 59870 Post Request for Bids Open - National 330,000.00 106,992.01 Signed alternative fishing practices Envelope 0 1 7 1 6 1 6 7 4 8 2 n mer pour les petits pêcheu and livelihoods activities rs (gilet, miroir… pour la pér iode transitoire) MG-MRHP-160447-GO-RFQ / Component 2. Strengthenin Fourniture des plaques d'im Request for Quot Single Stage - One 2020-03-1 2020-08-2 2020-04-1 2020-11-0 2020-05-1 2020-12-1 IDA / 59870 g capacities for priority fish Post Limited 100,000.00 18,218.09 Completed matriculations des pirogues ations Envelope 1 5 5 4 5 8 eries management (lot unique et indivisible) MG-MRHP-161268-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One 2020-02-2 2020-02-1 2020-03-0 2020-03-0 2020-03-1 Fourniture des carnets d'exp IDA / 59870 g capacities for priority fish Post Limited 8,400.00 8,166.14 Signed ations Envelope 7 8 6 5 3 édition des produits halieuti eries management ques MG-MRHP-127597-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One Pending Imp 2020-09-1 2020-12-1 2021-06-0 200 équipements et outils d IDA / 59870 g capacities for priority fish Post Limited 40,000.00 0.00 ations Envelope lementation 1 1 9 e pêches eries management MG-MRHP-119304-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One Pending Imp 2020-08-0 2020-09-2 2021-03-2 Matériels de l'électrification IDA / 59870 g capacities for priority fish Post Limited 9,000.00 0.00 ations Envelope lementation 4 9 8 hors grille : 03 eries management MG-MRHP-119300BIS-GO-R Component 2. Strengthenin Request for Quot Single Stage - One Pending Imp 2019-06-0 2019-08-2 2020-02-2 FQ / Acquisition d'une Vedet TF / A4588 g capacities for priority fish Post Limited 100,000.00 0.00 ations Envelope lementation 8 6 2 te pour appui CSP eries management Component 3. Strengthenin MG-MRHP-85764 BIS-GO-RF g capacities for engaging in Request for Quot Single Stage - One 2020-05-1 2020-05-0 2020-07-0 2020-06-1 2020-08-0 Q / Achat de 155 boites à pl IDA / 59870 Post Limited 12,000.00 11,910.86 Signed alternative fishing practices ations Envelope 3 8 8 0 7 aintes pour l'exercice 2020 and livelihoods activities MG-MRHP-174399-GO-RFQ / Component 3. Strengthenin Acquisition de 160 téléphon g capacities for engaging in Request for Quot Single Stage - One Under Imple 2020-05-3 2020-06-0 2020-07-2 2020-08-2 IDA / 59870 Post Limited 15,000.00 0.00 es mobiles pour le Mécanis alternative fishing practices ations Envelope mentation 1 3 6 5 me De Gestion des Plaintes and livelihoods activities (MDGP) / Exercice 2020 MG-MRHP-119314-GO-RFQ / Component 3. Strengthenin Achat de vedette pour la mi g capacities for engaging in Request for Quot Single Stage - One 2020-07-2 2020-09-1 2021-03-1 IDA / 59870 Post Limited 80,000.00 0.00 Canceled se en œuvre des activités d alternative fishing practices ations Envelope 0 4 3 ans la région Melaky :1 and livelihoods activities MG-MRHP-119300-GO-RFB / Acquisition de Cinq (05) Ved ettes pour CSP réparties en deux (02) lots: Component 2. Strengthenin - Lot 01: Acquisition de 03 V Single Stage - One 2020-04-1 2020-04-2 2020-06-0 2020-07-0 2020-08-0 2021-02-0 TF / A4588 g capacities for priority fish Post Request for Bids Open - National 321,500.00 0.00 Canceled edettes pour appuyer le CSP Envelope 5 0 1 1 5 1 eries management pour les nouvelles antennes au niveau des ZUP; - Lot 02: Acquisition de 02 v edettes rapides semi-rigides pour patrouilleurs MG-MRHP-119300BIS1-GO- RFB / Acquisition des vedett es réparties en 02 Lots : Component 2. Strengthenin Single Stage - One Under Imple 2020-06-1 2020-06-1 2020-06-1 2020-06-1 2020-07-1 2020-08-1 2020-09-1 2020-12-1 • Lot1 : 07 vedettes coque IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 551,500.00 0.00 Envelope mentation 5 2 6 9 6 5 9 8 s rigides ; eries management • Lot2 : 02 vedettes rapid es semi-rigides. MG-MRHP-28415-GO-RFB // Component 3. Strengthenin MG-PM-96 BIS / Outillage po g capacities for engaging in Request for Quot Single Stage - One 2020-04-2 2020-06-1 2020-12-1 IDA / 59870 Post Limited 19,000.00 0.00 Canceled ur les pépinières et les reboi alternative fishing practices ations Envelope 0 5 2 sements (brouette,….) : 19 and livelihoods activities MG-MRHP-14629-GO-RFQ// Component 2. Strengthenin Request for Quot Single Stage - One 2020-09-2 2021-03-2 2020-11-1 2021-04-1 2020-12-1 PA 2 / PA2: Acquisition d'un l IDA / Q9790 g capacities for priority fish Post Limited 11,000.00 4,352.99 Signed ations Envelope 9 6 7 6 7 ot de matériels de formation eries management et d'enquête MG-MRHP-119240-GO-RFB / Component 2. Strengthenin Renforcement du Centre de Single Stage - Two 2020-07-3 2020-08-0 2020-09-1 2020-11-2 2021-01-0 2021-07-0 IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 580,000.00 0.00 Canceled Développement de l'Aquacul Envelope 0 4 5 8 2 1 eries management ture (CDA) -Equipement der echerche MG-MRHP-188316-GO-RFB / Component 3. Strengthenin Fourniture et livraison de 11 g capacities for engaging in Open - Internation Single Stage - One 2020-08-1 2020-08-2 2020-08-1 2020-08-2 2020-09-2 2020-10-2 2020-10-1 2020-11-1 2020-11-1 2021-01-1 2021-01-1 IDA / 59870 Post Request for Bids 1,170,000.00 432,020.22 Signed .700 lots d'équipements de alternative fishing practices al Envelope 4 6 5 6 9 0 4 3 1 9 0 base pour la sécurité en mer and livelihoods activities MG-MRHP-192172-GO-RFQ / Achat de 15.000 Caches bou Component 4. Project mana Request for Quot Single Stage - One 2020-09-2 2020-11-1 2021-05-1 IDA / 59870 Post Limited 11,500.00 0.00 Canceled che avec logo SWIOFish2 po gement and coordination ations Envelope 2 7 6 ur les trois (03) UGL's et l'U GP du projet SWIOFish2 MG-MRHP-119300 RELANCE -GO-RFB / Acquisition des ve Component 2. Strengthenin Single Stage - One Under Imple 2021-01-1 2021-02-1 2021-01-2 2021-02-1 2021-03-0 2021-03-2 2021-04-0 2021-05-1 2021-11-0 dettes réparties en 02 Lots : IDA / 59870 g capacities for priority fish Post Request for Bids Limited 551,500.00 0.00 Envelope mentation 9 5 4 6 7 2 6 1 7 • Lot1 : 07 vedettes coques eries management rigides ; • Lot2 : 02 vedettes rapides semi-rigides. MG-MRHP-218714-GO-RFB / Component 2. Strengthenin Single Stage - One 2021-03-0 2021-03-3 2021-03-0 2021-04-0 2021-04-0 2021-05-0 2021-05-0 2021-07-1 2021-06-0 2021-11-0 2021-08-2 Acquisition des matériels inf IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 316,100.00 402,663.35 Signed Envelope 1 0 6 6 5 3 5 6 9 6 3 ormatiques 2020 et 2021 eries management MG-MRHP-119306-GO-RFQ / Component 3. Strengthenin Appui en biens et équipeme g capacities for engaging in Request for Quot Single Stage - One Pending Imp 2021-03-1 2021-05-0 2021-11-0 nts des groupements formel IDA / 59870 Post Limited 6,400.00 0.00 alternative fishing practices ations Envelope lementation 4 9 5 s: 32/ répartis en 2 Lots: Lot and livelihoods activities 1: Glacières; Lot 2: Couteau x MG-MRHP-203606-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One 2021-03-2 2021-05-2 2021-04-2 2021-07-1 2021-05-0 Acquisitions des téléphones IDA / 59870 g capacities for priority fish Post Open - National 19,200.00 17,632.53 Completed ations Envelope 0 9 0 3 1 mobiles pour l'UGP- SRPA et eries management RPA MG-MRHP-222323-GO-RFQ / Component 2. Strengthenin Acquisition d'une vedette et Request for Quot Single Stage - One Pending Imp 2021-04-0 2021-06-2 2021-09-0 IDA / 59870 g capacities for priority fish Post Limited 45,000.00 0.00 des autres équipements pou ations Envelope lementation 5 3 6 eries management r la prospections de nouvell e zone de pêche MG-MRHP-216847-GO-RFB / Component 3. Strengthenin Achat, installation et mainte g capacities for engaging in Open - Internation Single Stage - One 2021-04-1 2021-03-3 2021-04-2 2021-03-3 2021-06-0 2021-05-1 2021-06-2 2021-09-1 2021-07-3 2021-10-2 2022-01-2 IDA / 59870 Post Request for Bids 1,615,000.00 1,541,854.13 Signed nance d'équipements photo alternative fishing practices al Envelope 5 0 0 1 4 7 5 3 0 3 6 voltaïque pour 20 kiosques and livelihoods activities multiservices MG-MRHP-224078-GO-RFB / Component 3. Strengthenin Achat, installation et mainte g capacities for engaging in Open - Internation Single Stage - One 2021-04-1 2021-03-3 2021-04-2 2021-03-3 2021-06-0 2021-05-1 2021-07-0 2021-07-1 2021-08-0 2021-10-1 2022-02-0 IDA / 59870 Post Request for Bids 990,300.00 873,533.21 Signed nance d'équipements frigorif alternative fishing practices al Envelope 5 0 0 1 4 8 4 2 8 6 4 iques et de glace pour 20 ki and livelihoods activities osques multiservices MG-MRHP-227238-GO-RFB / Component 3. Strengthenin Fourniture et livraison des é g capacities for engaging in Open - Internation Single Stage - One 2021-05-1 2021-05-1 2021-05-2 2021-05-1 2021-07-0 2021-07-1 2021-07-3 2021-11-3 2021-09-0 2022-01-1 2022-03-0 IDA / 59870 Post Request for Bids 1,200,000.00 780,301.00 Signed quipements de base pour la alternative fishing practices al Envelope 5 7 0 8 1 9 1 0 4 7 3 sécurité en mer pour l'anné and livelihoods activities e 2021 et 2022 MG-MRHP-231608-GO-RFB / Component 2. Strengthenin Open - Internation Single Stage - One 2021-05-1 2022-05-1 2021-05-1 2022-05-1 2021-06-3 2022-06-3 2021-07-3 2022-09-1 2021-09-0 2022-03-0 Matériels et équipements po IDA / V0500 g capacities for priority fish Post Request for Bids 680,000.00 0.00 Signed al Envelope 4 0 9 6 0 0 0 3 3 2 ur laboratoire CEDP-CDA et eries management USTA Page 3 MG-MRHP-119240 BIS-GO-R Component 2. Strengthenin FB / Renforcement du Centr Single Stage - One 2021-03-2 2021-03-3 2021-04-3 2021-05-3 2021-07-0 2021-10-0 IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 580,000.00 0.00 Canceled e de Développement de l'Aq Envelope 6 1 0 0 4 2 eries management uaculture (CDA) -Equipemen t de recherche MG-MRHP-28156-GO-UN//-M Component 2. Strengthenin UN Agencies (Dir 2020-11-0 2020-11-2 2021-01-2 2021-07-2 G-PM-04 / Matériels et équip IDA / 59870 g capacities for priority fish Post Direct 50,000.00 0.00 Canceled ect) 2 3 5 4 ements pour laboratoire CE eries management DP MG-MRHP-232523-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One Pending Imp 2021-05-2 2021-07-2 2021-10-0 Acquisition d'une vedette fri IDA / 59870 g capacities for priority fish Post Limited 73,000.00 0.00 ations Envelope lementation 5 0 3 gorifique CDPHM eries management MG-MRHP-231602-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One Pending Imp 2021-05-2 2021-07-2 2022-01-1 Acquisition de Drones pour IDA / D1720 g capacities for priority fish Post Limited 26,000.00 0.00 ations Envelope lementation 5 0 6 CSC, formation et service ap eries management rès vente MG-MRHP-232525-GO-RFQ / Component 2. Strengthenin Acquisition des matériels ro Request for Quot Single Stage - One Pending Imp 2021-05-2 2021-07-2 2021-10-1 IDA / 59870 g capacities for priority fish Post Open - National 86,000.00 0.00 ulants ( 02 camions Frigorifi ations Envelope lementation 6 1 9 eries management ques de capacité 5 tonnes) pour les sites du CDPHM MG-MRHP-232534-GO-RFQ / Component 4. Project mana Request for Quot Single Stage - One 2021-05-2 2021-12-0 2021-07-2 2022-03-1 2022-01-1 Acquisition et installation d' IDA / Q9790 Post Open - National 50,000.00 20,955.96 Signed gement and coordination ations Envelope 5 9 0 2 6 un logiciel de suivi évaluatio n MG-MRHP-119295-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One 2021-03-1 2021-05-1 2021-11-0 Achat de Lot d'équipements IDA / 59870 g capacities for priority fish Post Limited 10,000.00 0.00 Canceled ations Envelope 5 0 6 pour laboratoire USTA eries management MG-MRHP-119300 RELANCE Component 2. Strengthenin LOT2-GO-RFB / Acquisition d Single Stage - One 2021-11-3 2021-12-1 2021-12-0 2021-12-2 2021-12-3 2022-03-1 2022-01-3 2022-03-0 2022-06-0 TF / A4588 g capacities for priority fish Post Request for Bids Open - National 170,000.00 0.00 Canceled e 02 vedettes rapides semi-r Envelope 0 7 1 1 1 0 0 6 4 eries management igides pour CSP (Relance Lot 2) MG-MRHP-262317-GO-RFQ / Component 2. Strengthenin Acquisition des matériels inf Request for Quot Single Stage - One 2021-12-0 2021-12-0 2022-01-3 2022-04-3 IDA / 59870 g capacities for priority fish Post Open - National 93,600.00 0.00 Canceled ormatiques 2020 et 2021 (re ations Envelope 5 9 0 0 eries management lance lot 8: tablettes) MG-MRHP-284470-GO-RFQ / Component 2. Strengthenin Single Stage - One Under Imple 2022-04-1 2022-05-0 2022-04-2 2022-05-3 2022-06-0 2022-07-0 2022-08-0 2023-02-0 Acquisition mobiliers de bur IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 427,553.00 0.00 Envelope mentation 5 6 0 0 1 1 5 1 eau pour les bureaux admini eries management stratifs 2022-2023 Component 3. Strengthenin MG-MRHP-28421-GO-RFB// g capacities for engaging in Single Stage - One Pending Imp 2020-09-1 2020-09-2 2020-11-0 2020-12-0 2021-01-0 2021-07-0 MG-PM-99 / Acquisition des IDA / V0500 Post Request for Bids Open - National 500,000.00 0.00 alternative fishing practices Envelope lementation 7 2 3 3 7 6 kits de panneaux solaires and livelihoods activities MG-MRHP-119315-GO-RFQ / Component 3. Strengthenin Renforcement de l'unité de g capacities for engaging in Request for Quot Single Stage - One Pending Imp 2022-05-0 2022-06-3 2022-12-2 IDA / 59870 Post Limited 55,000.00 0.00 gestion communautaire en b alternative fishing practices ations Envelope lementation 5 0 7 iens et équipements : 22 and livelihoods activities MG-MRHP-289660-GO-RFQ / Component 3. Strengthenin Équipements et outils de for g capacities for engaging in Request for Quot Single Stage - One Pending Imp 2022-04-2 2022-06-1 2022-12-1 IDA / 59870 Post Open - National 100,000.00 0.00 mation de technique de pêc alternative fishing practices ations Envelope lementation 3 8 5 he: palangre and livelihoods activities MG-MRHP-289646-GO-RFQ / Component 3. Strengthenin Equipement pour la commer g capacities for engaging in Request for Quot Single Stage - One Pending Imp 2022-04-2 2022-06-1 2022-12-1 IDA / 59870 Post Open - National 40,000.00 0.00 cialisation des produits de p alternative fishing practices ations Envelope lementation 1 6 3 êche and livelihoods activities MG-MRHP-231589-GO-RFQ / Component 2. Strengthenin Acquisition de 20 tablettes Request for Quot Single Stage - One Pending Imp 2022-07-0 2022-08-3 2022-10-3 IDA / V0500 g capacities for priority fish Post Open - National 37,000.00 0.00 marinisées pour le Centre d ations Envelope lementation 6 1 0 eries management e Surveillance de Pêche MG-MRHP-119303-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One Pending Imp 2022-11-0 2023-01-0 2023-06-3 Dotation et moyens d'équip TF / A4588 g capacities for priority fish Post Limited 48,000.00 0.00 ations Envelope lementation 6 1 0 ement pour les membres du eries management CSC : 24 MG-MRHP-119300_2ÈME RE Component 2. Strengthenin LANCE LOT2-GO-RFB / Acqui Open - Internation Single Stage - One Under Imple 2022-05-3 2022-05-2 2022-06-0 2022-05-2 2022-07-1 2022-07-1 2022-08-0 2022-09-1 2022-12-1 TF / A4588 g capacities for priority fish Post Request for Bids 170,000.00 0.00 sition de 02 vedettes rapide al Envelope mentation 0 3 4 5 9 1 9 3 2 eries management s semi-rigides pour CSP MG-MRHP-262317-GO-RFQ- 2ÈME RELANCE / ACQUISITI Component 2. Strengthenin ON DES TABLETTES POUR C Request for Quot Single Stage - One Pending Imp 2022-06-0 2022-07-1 2022-09-1 IDA / 59870 g capacities for priority fish Post Open - National 100,000.00 0.00 ENTRE DE SURVEILLANCE D ations Envelope lementation 4 6 4 eries management E PÊCHE, STATISTIQUE ET 1 3 RÉGIONS CÔTIÈRES DE L’U GP SWIOFISH2 MG-MRHP-296825-GO-RFQ / Component 2. Strengthenin Acquisition des smartphones Request for Quot Single Stage - One 2022-06-1 2022-10-2 2022-08-0 2022-09-0 TF / A4588 g capacities for priority fish Post Open - National 30,000.00 0.00 Signed pour la collecte des données ations Envelope 3 7 8 7 eries management pour le Service d'Etude MPE B MG-MRHP-119299-GO-RFQ / Matériels d'échantillonnages Component 2. Strengthenin Request for Quot Single Stage - One Under Imple 2022-06-2 2023-04-1 2022-08-1 2022-08-2 pour Services d'Etudes (Ex- TF / A4588 g capacities for priority fish Post Open - National 40,000.00 0.00 ations Envelope mentation 1 2 6 2 USTA) et Enquêteurs pour St eries management atistique et Kit d'Inspection pour CSP MG-MRHP-256429-GO-RFQ / Component 2. Strengthenin Request for Quot Single Stage - One 2021-10-2 2021-12-0 2021-12-1 2022-01-1 Acquisition de 20 VTT pour l TF / A4588 g capacities for priority fish Post Open - National 6,000.00 0.00 Canceled ations Envelope 3 9 8 7 es antennes USTA eries management MG-MRHP-307043-GO-RFB / Fourniture, Installation, Mise en service et Maintenance d Component 3. Strengthenin e vingt-six (26) infrastructur g capacities for engaging in Open - Internation Single Stage - One Under Imple 2022-09-2 2022-10-3 2022-10-0 2022-10-3 2022-11-1 2022-12-1 2023-01-1 2023-07-1 IDA / 59870 Post Request for Bids 1,100,000.00 0.00 es frigorifiques dans les loca alternative fishing practices al Envelope mentation 9 1 4 1 5 5 9 8 lités de pêcheurs dans les Z and livelihoods activities ones Ultra Prioritaires (ZUP) sur deux (02) régions de MA DAGASCAR : ANALANJIROFO - DIANA MG-MRHP-307036-GO-RFB / Fourniture, Installation, Mise en service et Maintenance d Component 3. Strengthenin e vingt-six (26) infrastructur g capacities for engaging in Open - Internation Single Stage - One Under Imple 2022-09-2 2022-10-2 2022-10-0 2022-10-3 2022-11-1 2022-12-1 2022-12-1 2023-01-1 2023-07-1 IDA / 59870 Post Request for Bids 1,800,000.00 0.00 es énergétiques dans les loc alternative fishing practices al Envelope mentation 9 7 4 1 5 4 5 9 8 alités de pêcheurs dans les and livelihoods activities Zones Ultra Prioritaires (ZUP ) sur deux (02) régions de M ADAGASCAR : ANALANJIROF O - DIANA MG-MRHP-329768-GO-RFQ / Component 3. Strengthenin Acquisition matériels de co g capacities for engaging in Request for Quot Single Stage - One Pending Imp 2022-12-1 2023-02-0 2023-08-0 IDA / 59870 Post Open - National 5,000.00 0.00 mmunication de la météo m alternative fishing practices ations Envelope lementation 5 9 8 arine: Panneau SAP - Téléph and livelihoods activities one solaire - radio VHF MG-MRHP-329336-GO-RFB / Outil et équipement de valor Component 3. Strengthenin isation et commercialisation g capacities for engaging in Single Stage - One Under Imple 2023-01-1 2023-02-0 2023-01-1 2023-02-0 2023-02-1 2023-03-1 2023-04-2 2023-07-1 IDA / 59870 Post Request for Bids Open - National 500,000.00 0.00 compose de 400 bicyclette à alternative fishing practices Envelope mentation 0 3 5 8 4 6 0 9 grande roue, 250 Glacière 5 and livelihoods activities 0litres et 150 bac ajouré 70li tre MG-MRHP-256423-GO-DIR / Component 2. Strengthenin 2022-05-0 2022-05-1 2022-06-1 2022-10-1 Acquisition de 33 motos 5 TF / A4588 g capacities for priority fish Post Direct Selection Direct 70,000.00 0.00 Canceled 6 1 5 3 motos eries management MG-MRHP-332050-GO-RFB / Acquisition des matériels ro Component 2. Strengthenin Single Stage - One Under Imple 2023-01-1 2023-02-0 2023-01-1 2023-02-0 2023-02-1 2023-03-0 2023-04-1 2023-07-1 ulants répartis en 2 Lots: IDA / 59870 g capacities for priority fish Post Request for Bids Open - National 495,000.00 0.00 Envelope mentation 0 3 5 6 4 7 1 0 • Lot 01: 05 véhicules 4*4 eries management • Lot 02: 45 motos MG-MRHP-338246-GO-RFB / Component 2. Strengthenin Open - Internation Single Stage - One Under Imple 2023-02-0 2023-02-1 2023-02-0 2023-02-1 2023-03-1 2023-03-1 2023-03-1 2023-05-2 2023-03-2 2023-07-2 Acquisition de matériels info IDA / 59870 g capacities for priority fish Post Request for Bids 490,000.00 0.00 al Envelope mentation 3 0 8 3 0 3 5 5 5 3 rmatiques 2022 et 2023 eries management MG-MRHP-331442-GO-RFB / La fourniture, Livraison, Inst allation et Mise en service d Component 3. Strengthenin e 200 lampadaires solaires g capacities for engaging in Single Stage - One Under Imple 2023-01-1 2023-02-1 2023-01-1 2023-02-1 2023-02-1 2023-03-0 2023-03-1 2023-08-0 IDA / 59870 Post Request for Bids Open - National 140,000.00 0.00 dans les localités des Zones alternative fishing practices Envelope mentation 0 1 5 3 4 1 1 8 Ultra Prioritaires des pêcheu and livelihoods activities rs dans (03) trois Régions à Madagascar : MELAKY - DIA NA - ANALANJIROFO MG-MRHP-338964-GO-DIR / Component 3. Strengthenin Equipement et d'outils de pê g capacities for engaging in Under Imple 2023-01-3 2023-02-2 2023-02-0 2023-02-2 2023-02-2 2023-07-2 che: 20.000 kits composés d IDA / 59870 Post Direct Selection Direct - National 436,800.00 0.00 alternative fishing practices mentation 1 4 5 4 4 4 e palmes réglable, masque and livelihoods activities de plongé, tuba et sac de tr ansport MG-MRHP-338245-GO-RFB / Component 3. Strengthenin Outils de valorisation compo g capacities for engaging in Single Stage - One Under Imple 2023-02-0 2023-02-1 2023-02-0 2023-02-1 2023-03-1 2023-03-1 2023-03-1 2023-03-2 2023-03-2 2023-04-0 IDA / 59870 Post Request for Bids Open - National 650,000.00 0.00 sé de 325 broyeurs à disque alternative fishing practices Envelope mentation 3 0 8 3 0 3 5 8 5 3 , à percussion et de 125 pell and livelihoods activities etiseur à pédale MG-MRHP-338984-GO-RFB / La fourniture, Livraison, Inst allation et Mise en service d Component 3. Strengthenin e 20 kits de congélateurs sol g capacities for engaging in Single Stage - One Under Imple 2023-01-3 2023-02-1 2023-02-0 2023-02-1 2023-03-0 2023-03-1 2023-03-2 2023-08-2 IDA / 59870 Post Request for Bids Open - National 50,000.00 0.00 aires dans les localités des Z alternative fishing practices Envelope mentation 1 1 2 3 4 4 9 6 ones Ultra Prioritaires des p and livelihoods activities êcheurs dans (03) trois Régi ons à Madagascar , Region MELAKY - DIANA - ANALANJI ROFO MG-MRHP-346374-GO-RFQ / Component 3. Strengthenin Acquisition de 500 téléphon g capacities for engaging in Request for Quot Single Stage - One Pending Imp 2023-03-1 2023-04-3 2023-06-2 IDA / 59870 Post Open - National 100,000.00 0.00 es solaires et 300 radios VH alternative fishing practices ations Envelope lementation 9 0 9 F and livelihoods activities MG-MRHP-346378-GO-DIR / Fourniture et installation, Fo rmation des points focaux et Component 3. Strengthenin accompagnement pour la mi g capacities for engaging in Under Imple 2023-03-1 2023-03-1 2023-03-1 2023-03-1 2023-04-1 2023-08-1 IDA / 59870 Post Direct Selection Direct - National 1,975,000.00 0.00 se en service de 3000 pann alternative fishing practices mentation 4 4 9 4 6 4 eaux agrometeorologique d and livelihoods activities e type MITAO FORECAST (pa nneaux SAP) dans les 14 rég ions côtières de Madagascar MG-MRHP-355024-GO-RFB / Component 3. Strengthenin Acquisition d'équipements p g capacities for engaging in Open - Internation Single Stage - One Pending Imp 2023-05-1 2023-05-2 2023-07-0 2023-07-1 2023-07-2 2023-09-2 our la mise en œuvre de l'Ac IDA / 59870 Post Request for Bids 1,920,000.00 0.00 alternative fishing practices al Envelope lementation 6 1 5 5 7 9 tivité Génératrice des Reven and livelihoods activities us ( AGR) pour les pêcheurs. Component 3. Strengthenin MG-MRHP-361766-GO-DIR / g capacities for engaging in Pending Imp 2023-05-1 2023-05-2 2023-06-1 2023-08-2 Acquisition des divers matér IDA / 59870 Post Direct Selection Direct - National 900,000.00 0.00 alternative fishing practices lementation 8 8 2 6 iels de pêches and livelihoods activities MG-MRHP-362169-GO-RFB / Component 3. Strengthenin Acquisition et installation de g capacities for engaging in Single Stage - One Pending Imp 2023-05-2 2023-05-3 2023-06-2 2023-07-0 2023-07-1 2023-09-0 s matériels et équipements IDA / 59870 Post Request for Bids Open - National 290,000.00 0.00 alternative fishing practices Envelope lementation 5 0 9 4 1 9 pour le fonctionnement des i and livelihoods activities nfrastructures construites Page 4 MG-MRHP-362172-GO-RFB / Component 3. Strengthenin Renforcement de l'unité de g capacities for engaging in Single Stage - One Pending Imp 2023-05-2 2023-05-3 2023-06-2 2023-07-0 2023-07-1 2023-09-0 IDA / 59870 Post Request for Bids Open - National 300,000.00 0.00 gestion communautaire en b alternative fishing practices Envelope lementation 5 0 9 4 1 9 iens et équipements; and livelihoods activities NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Repor Loan / Credit Market Approa Procurement Pr Prequalificatio Estimated A Actual Amoun Process St Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission Description Component Review Type Method t and Recommendati Signed Contract Contract Completion No. ch ocess n (Y/N) mount (US$) t (US$) atus n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes on for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MRHP-151759-NC-RFB / Component 2. Strengthenin Open - Internation Single Stage - One 2020-01-0 2020-01-2 2020-01-1 2020-01-2 2020-02-2 2020-03-1 2020-02-2 2020-06-1 2020-03-2 2020-11-2 2020-05-2 Analyse PC de l'eau de traite IDA / 59870 g capacities for priority fish Post Request for Bids 110,000.00 186,954.22 Signed al Envelope 6 9 1 9 5 6 6 5 2 6 1 ment ou de production (lot eries management N°1) MG-MRHP-151759BIS1-NC- Component 2. Strengthenin RFQ / Analyses officielles po Request for Quot Single Stage - One Pending Imp 2019-08-1 2019-10-2 2019-12-2 IDA / 59870 g capacities for priority fish Post Limited 100,000.00 0.00 ur le compte de l'Autorité Sa ations Envelope lementation 0 8 7 eries management nitaire Halieutique (ASH) rép artie en 9 Lots MG-MRHP-192432-NC-RFB / Analyses officielles relatives au contrôle de la qualité phy sico-chimique des eaux de tr Component 2. Strengthenin Open - Internation Single Stage - One Under Imple 2020-09-2 2021-10-1 2020-09-2 2021-10-1 2020-11-1 2021-12-0 2020-12-0 2021-01-0 2021-04-0 aitement et de production et IDA / 59870 g capacities for priority fish Post Request for Bids 309,750.00 0.00 al Envelope mentation 2 3 7 3 1 7 2 2 2 des résidus chimiques et co eries management ntaminants dans les produit s de la pêche et d’aquacultu re, conformément aux plans de surveillance nationaux 2 02 MG-MRHP-192435-NC-DIR / Analyses officielles relatives à la Recherche de Vibrio pot Component 2. Strengthenin entiellement entéropathogè Pending Imp 2020-09-2 2020-09-2 2020-11-2 2021-02-2 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 7,860.00 0.00 nes dans les produits de la p lementation 2 7 5 3 eries management êche et d’aquaculture (crust acées : crabes et crevettes), conformément aux plans de surveillance nationaux 2020 MG-MRHP-196025-NC-DIR / Component 2. Strengthenin Diagnostic des maladies des Pending Imp 2020-10-0 2020-10-3 2020-11-2 2020-12-1 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 47,000.00 0.00 crustacés dans le cadre de l lementation 9 0 6 1 eries management a réalisation du Plan de Surv eillance 2020 MG-MRHP-231600-NC-DIR / Component 2. Strengthenin Acquisition et installation d' Under Imple 2021-05-2 2021-05-2 2021-07-1 2022-07-1 IDA / V0500 g capacities for priority fish Post Direct Selection Direct 37,000.00 0.00 équipement des deux Patro mentation 0 5 4 4 eries management uilleurs (Atsantsa et Telonify )   à bord des navires MG-MRHP-231592-NC-DIR / Extension de l’application d Component 2. Strengthenin 2021-05-2 2021-05-2 2021-05-2 2021-06-1 2021-07-1 2021-10-2 2022-07-1 u système ERS du Centre de IDA / V0500 g capacities for priority fish Post Direct Selection Direct 36,600.00 47,559.62 Signed 0 7 5 4 4 2 4 Surveillance des Pêches de eries management Madagascar aux navires nati onaux et étrangers hors-UE MG-MRHP-289369-NC-DIR / Analyse officielle en laborat Component 2. Strengthenin oire de dosage des substan Under Imple 2022-04-1 2022-04-2 2022-04-1 2022-04-2 2022-05-2 2022-11-1 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 30,000.00 0.00 ces interdites et résidus mé mentation 2 1 7 5 2 8 eries management dicamenteux et de dosage de résidus de pes ticides MG-MRHP-295994-NC-RFQ / ACHEMINEMENT DES PRELE VEMENTS DE PRODUITS DE LA PECHE POUR ANALYSES Component 2. Strengthenin OFFICIELLES DANS LE CADR Request for Quot Single Stage - One Pending Imp 2022-05-3 2022-07-2 2023-01-2 IDA / 59870 g capacities for priority fish Post Open - National 51,000.00 0.00 E DE LA REALISATION DES P ations Envelope lementation 0 5 1 eries management LANS DE SURVEILLANCE SA NITAIRES 2020 & 2021 DE L’ AUTORITE SANITAIRE HALIE UTIQUE JUSQU’AUX LABORA TOIRES ACCREDITES INTERN ATIONAUX RETENUS. Component 3. Strengthenin MG-MRHP-REG2022-NC-RFQ g capacities for engaging in Request for Quot Single Stage - One 2022-05-3 2022-05-3 2022-06-0 2022-06-0 2022-06-2 / Dédouanement de 20000 k IDA / 59870 Post Limited 100,000.00 93,478.02 Signed alternative fishing practices ations Envelope 1 1 6 8 1 it de sécurté en mer and livelihoods activities MG-MRHP-296834-NC-RFP / Firme pour la réparation des Component 2. Strengthenin Request for Quot Single Stage - One Pending Imp 2022-06-2 2022-08-1 2023-02-1 imprimantes photocopieurs, IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 ations Envelope lementation 1 6 2 scanners, dupli copieurs,mat eries management ériels informatique et électr onique MG-MRHP-REG2020-NC-RFQ Component 4. Project mana Request for Quot Single Stage - One 2020-11-0 2020-11-0 2020-11-1 2020-11-2 2021-11-1 / Hébergement mail professi IDA / 59870 Post Limited 13,800.00 13,793.14 Signed gement and coordination ations Envelope 6 6 9 0 9 onnel du projet SWIOFish2 MG-MRHP-308415-NC-RFQ / Prestation de service en Age Component 2. Strengthenin Request for Quot Single Stage - One Pending Imp 2022-11-0 2022-12-3 2023-06-2 nce de Voyage ( Billet d'avio IDA / 59870 g capacities for priority fish Post Open - National 100,000.00 0.00 ations Envelope lementation 5 1 9 n) pour les voyages à l'étran eries management ger - Contrat Cadre Multi at tributaire de 12 mois- MG-MRHP-337984-NC-DIR / Component 2. Strengthenin Direct - Internatio Pending Imp 2023-01-2 2023-02-0 2023-03-0 2023-05-3 Support et Maintenance de l IDA / D1720 g capacities for priority fish Post Direct Selection 50,000.00 0.00 nal lementation 7 1 2 1 'application THEMIS-VMS pa eries management r CLS CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluatio Loan / Credit Market Approa Contract Type Estimated Am Actual Amou Process Statu Expression of Interes Request for Proposal Opening of Technical Evaluation of Techni Description Component Review Type Method Terms of Reference Request for Proposal n Report and Draft N Signed Contract Contract Completion No. ch ount (US$) nt (US$) s t Notice s as Issued Proposals / Minutes cal Proposal s egotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MRHP-14498-CS-QCBS// PA-13 / PA 13: Mise à jour de Component 2. Strengthenin Quality And Cost- Open - Internation 2017-05-3 2017-07-2 2017-09-1 2017-09-1 2017-09-2 2017-10-2 2018-10-2 la Stratégie d'aquaculture et IDA / Q9790 g capacities for priority fish Post 75,000.00 0.00 Canceled 2017-05-16 Based Selection al 0 8 1 3 2 0 0 élaboration de plan de dével eries management oppement des 03 filières aq uaculture MG-MRHP-14951-CS-LCS//P A65 / PA 65: Etudes techniq ues : - Clôture de l'enceinte DRRH Component 2. Strengthenin P Fénérive Least Cost Select Open - Internation 2017-12-1 2017-05-3 2017-07-2 2018-03-1 2017-08-2 2018-04-1 2017-08-2 2018-04-2 2017-09-1 2018-05-0 2017-10-0 2018-07-0 2018-04-0 2019-07-2 IDA / Q9790 g capacities for priority fish Post 35,000.00 25,756.66 Completed 2017-05-17 - Construction des Bureaux ion al 9 1 2 9 1 7 8 4 1 7 9 3 7 4 eries management de 06 DRRHP - Extension de l'ASH à Antsir anana et Morondava - Construction local pour bur eau UGP MG-MRHP-23760-CS-QCBS// MG-PM-117 / Recrutement d' Component 3. Strengthenin un Cabinet d'étude ou d'une g capacities for engaging in Quality And Cost- 2017-10-3 2017-10-0 2018-08-2 2017-12-1 2018-09-1 2018-01-0 2019-02-0 2018-02-0 2019-07-0 2018-03-2 2019-08-1 2018-05-0 2019-09-2 2020-04-3 ONG pour assurer les missio IDA / Q9790 Prior Open - National 600,000.00 677,965.07 Signed 2017-09-14 alternative fishing practices Based Selection 0 5 9 0 8 7 7 6 8 0 6 1 4 0 ns de l'AGEX pour l'appui à l and livelihoods activities a mise en œuvre du Plan d'A ménagement des Pêcheries de la Baie d'Antongil MG-MRHP-27282-CS-QCBS// Component 2. Strengthenin Quality And Cost- Open - Internation 2017-09-2 2017-11-2 2017-12-2 2017-08-0 2018-01-2 2018-02-2 2018-04-0 2019-04-0 PA61 / Appui à la mise en pl IDA / Q9790 g capacities for priority fish Prior 500,000.00 0.00 Canceled 2017-09-07 Based Selection al 8 6 4 4 3 7 3 3 ace des outils d'aménageme eries management nt des pêches MG-MRHP-28166-CS-QCBS// Component 2. Strengthenin Quality And Cost- Open - Internation 2018-01-0 2018-03-1 2018-04-0 2018-05-2 2018-07-0 2018-08-1 2019-08-1 MG-PM-14 / Recueil et analy IDA / D1720 g capacities for priority fish Post 25,000.00 0.00 Canceled 2017-12-15 Based Selection al 5 2 9 4 5 6 6 se des informations de base eries management avant-projet MG-MRHP-28168-CS-QCBS// Component 2. Strengthenin MG-PM-16 / Collecte des don Quality And Cost- Open - Internation Pending Implem 2018-01-0 2018-03-1 2018-04-0 2018-05-2 2018-07-0 2018-08-1 2019-08-1 IDA / D1720 g capacities for priority fish Post 20,000.00 0.00 2017-12-15 nées au niveau des régions Based Selection al entation 5 2 9 4 5 6 6 eries management prioritaires (Artfish) MG-MRHP-28170-CS-CQS// MG-PM-18 / Identification de s besoins en formation et él Component 2. Strengthenin Consultant Qualif Open - Internation 2018-01-1 2018-03-1 2018-04-1 2018-05-3 2018-11-2 aboration du plan de formati IDA / 59870 g capacities for priority fish Post 20,000.00 0.00 Canceled 2017-12-22 ication Selection al 2 9 8 0 6 on des agents de l'administr eries management ation (y compris Inventaire et contact des centres de fo rmation locaux et extérieurs ) MG-MRHP-28171-CS-CQS// MG-PM-19 / Etude sur l'ident ification et recensement des Component 3. Strengthenin bénéficiaires chaque année, g capacities for engaging in Consultant Qualif Open - Internation 2017-10-2 2017-12-0 2018-02-1 2019-05-3 2018-03-2 2019-09-0 2018-05-0 2019-09-1 2018-11-0 2020-11-0 IDA / 59870 Post 200,000.00 159,792.61 Completed 2017-11-15 du montant et des modalité alternative fishing practices ication Selection al 4 6 0 1 7 6 8 8 4 2 s de transfert financier, du and livelihoods activities montant minimal de filet soc ial pour les pêcheurs/acteur s filières affectés par les me sures de gestion MG-MRHP-28174-CS-CQS// Component 3. Strengthenin MG-PM-22 / Étude sur le circ g capacities for engaging in Consultant Qualif Open - Internation 2019-06-1 2017-12-2 2018-02-2 2018-04-1 2018-05-2 2018-11-1 IDA / 59870 Post 90,000.00 0.00 Canceled 2017-11-30 uit de commercialisation des alternative fishing practices ication Selection al 7 1 5 1 3 9 produits des pêches and livelihoods activities MG-MRHP-28175-CS-CQS// MG-PM-23 / Étude et enquêt e sur l'état des lieux des acc Component 3. Strengthenin idents en mer de la petite p g capacities for engaging in Consultant Qualif Open - Internation 2019-02-2 2017-12-2 2018-02-2 2019-02-2 2018-04-1 2019-06-1 2018-05-2 2019-06-1 2018-11-1 êche et aux éventuelles mes IDA / 59870 Post 120,000.00 50,244.29 Signed 2017-11-30 alternative fishing practices ication Selection al 6 1 5 6 1 4 3 4 9 ures déjà prises/analyse de and livelihoods activities s accidentologies/aspect inst itutionnel sur les responsabil ités de la petite pêche/ à titr e provisoire proposer les éq uipements MG-MRHP-28319-CS-QCBS// Component 3. Strengthenin MG-PM-25 / Diagnostic des b g capacities for engaging in Quality And Cost- Open - Internation 2019-03-1 2018-01-0 2018-03-1 2018-04-0 2018-05-2 2018-07-0 2018-08-1 2019-08-1 esoins en activités alternativ IDA / 59870 Post 150,000.00 0.00 Canceled 2017-12-15 alternative fishing practices Based Selection al 5 5 2 9 4 5 6 6 es adaptées pour chaque ré and livelihoods activities gion ultra prioritaire (exécut ée par AGEX) MG-MRHP-28322-CS-QCBS// Component 3. Strengthenin MG-PM-27 / Détermination d g capacities for engaging in Quality And Cost- Open - Internation 2017-01-2 2017-11-2 2018-01-2 2017-09-0 2018-02-2 2017-10-1 2018-04-0 2017-10-1 2018-05-2 2018-08-0 2018-07-0 2018-09-2 2019-07-0 2019-07-2 IDA / 59870 Post 60,000.00 66,260.37 Completed 2017-10-30 es outils financiers d'appui a alternative fishing practices Based Selection al 4 0 5 6 2 0 8 0 0 8 1 5 1 3 ux filières et activités altern and livelihoods activities atives MG-MRHP-28323-CS-CQS// Component 3. Strengthenin MG-PM-28 / Étude sur l'amél g capacities for engaging in Consultant Qualif Open - Internation 2017-11-0 2018-01-1 2018-02-2 2018-04-0 2018-10-0 IDA / 59870 Post 60,000.00 0.00 Canceled 2017-10-16 ioration des conditions de vi alternative fishing practices ication Selection al 6 1 5 8 5 e sociale des communautés and livelihoods activities de pêcheur MG-MRHP-28330-CS-QCBS// MG-PM-31 / État de lieux des Component 3. Strengthenin petites infrastructures de pê g capacities for engaging in Quality And Cost- Open - Internation 2019-04-0 2017-11-2 2019-04-1 2018-01-2 2019-06-0 2018-02-2 2019-07-1 2018-04-0 2019-07-1 2018-05-2 2019-09-1 2018-07-0 2019-10-1 2019-07-0 2020-11-0 IDA / 59870 Post 120,000.00 113,351.50 Completed 2017-10-30 ches et les besoins des com alternative fishing practices Based Selection al 4 0 5 5 6 2 7 8 8 0 3 1 0 1 3 munautés cibles en petites i and livelihoods activities nfrastructures de pêche et c ommunautaires MG-MRHP-28333-CS-QCBS// Component 3. Strengthenin MG-PM-32 / Étude des besoi g capacities for engaging in Quality And Cost- Open - Internation 2017-11-2 2018-01-2 2018-02-2 2018-04-0 2018-05-2 2018-07-0 2019-07-0 IDA / 59870 Post 200,000.00 0.00 Canceled 2017-10-30 ns communautaires (une ét alternative fishing practices Based Selection al 0 5 2 8 0 1 1 ude par district) and livelihoods activities Page 5 MG-MRHP-28336-CS-CQS// Component 3. Strengthenin MG-PM-33 / Préparation du p g capacities for engaging in Consultant Qualif Open - Internation 2017-11-2 2018-01-2 2018-03-1 2018-04-2 2018-10-1 IDA / 59870 Post 60,000.00 0.00 Canceled 2017-10-30 lan local d'électrification co alternative fishing practices ication Selection al 0 5 1 2 9 mmunautaire : étude et rap and livelihoods activities ports MG-MRHP-28342-CS-CQS// MG-PM-39 / Études techniqu Component 4. Project mana Consultant Qualif 2017-11-2 2018-01-2 2018-03-1 2018-04-2 2018-10-1 IDA / 59870 Post Open - National 13,500.00 0.00 Canceled 2017-10-30 es pour la construction d'un gement and coordination ication Selection 0 5 1 2 9 local pour bureau UGP MG-MRHP-28343-CS-LCS//M G-PM-40 / Études d'impacts Component 4. Project mana Least Cost Select Open - Internation 2018-01-0 2018-03-1 2018-04-0 2018-05-0 2018-06-2 2018-08-0 2019-01-2 IDA / 59870 Post 10,000.00 0.00 Canceled 2017-12-15 environnementales et social gement and coordination ion al 5 2 9 9 0 1 8 es pour la construction d'un local pour bureau UGP MG-MRHP-27288-CS-QCBS// Component 2. Strengthenin PA62 / Appui à la mise en œ Quality And Cost- Open - Internation 2016-09-0 2017-09-2 2017-11-1 2017-06-0 2017-12-0 2017-07-1 2018-01-0 2017-08-0 2018-02-1 2017-10-2 2018-03-1 2018-05-0 2019-03-1 2019-07-1 IDA / Q9790 g capacities for priority fish Post 255,000.00 234,182.87 Completed 2017-09-07 uvre du plan d'amélioration Based Selection al 6 8 1 6 9 7 8 4 2 0 9 2 9 6 eries management de la pêcherie crevettière MG-MRHP-28654-CS-CQS// MG-PM-113 / Mise à jour de l Component 2. Strengthenin Consultant Qualif 2018-02-2 2018-04-2 2018-06-1 2018-07-2 2019-01-2 a Stratégie Nationale de l'Aq IDA / 59870 g capacities for priority fish Post Open - National 30,000.00 0.00 Canceled 2018-02-01 ication Selection 2 9 3 5 1 uaculture (Consultant natio eries management nal + Réunions (1 consultati on, 1 validation) MG-MRHP-28656-CS-CQS// MG-PM-114 / Étude sur les p Component 2. Strengthenin rocédures administratives ré Consultant Qualif 2018-02-2 2018-04-2 2018-06-1 2018-07-2 2019-01-1 IDA / 59870 g capacities for priority fish Post Open - National 50,000.00 0.00 Canceled 2018-01-30 gissant l'accès aux ressourc ication Selection 0 7 1 3 9 eries management es et examen des options et recommandations (6 outils d e gestion) MG-MRHP-28657-CS-CQS// Component 2. Strengthenin MG-PM-115 / Diagnostic du Consultant Qualif 2018-06-2 2018-08-2 2018-10-1 2018-11-2 2019-05-2 IDA / 59870 g capacities for priority fish Post Open - National 30,000.00 0.00 Canceled 2018-06-01 secteur dans le domaine fin ication Selection 2 7 1 2 1 eries management ancier local, régional, intern ational MG-MRHP-28659-CS-CQS// Component 2. Strengthenin MG-PM-116 / Élaboration de Consultant Qualif 2018-02-2 2018-04-2 2018-05-2 2018-07-0 2019-01-0 IDA / 59870 g capacities for priority fish Post Open - National 10,000.00 0.00 Canceled 2018-01-30 la stratégie d'adaptation du ication Selection 0 7 7 8 4 eries management secteur pêche face au chan gement climatique MG-MRHP-28661-CS-CQS// Component 2. Strengthenin Consultant Qualif 2018-06-2 2018-08-2 2018-09-2 2018-11-0 2019-05-0 MG-PM-118 / Recueil et anal IDA / D1720 g capacities for priority fish Post Open - National 30,000.00 0.00 Canceled 2018-06-01 ication Selection 2 7 6 7 6 yse des informations de bas eries management e avant-projet MG-MRHP-28663-CS-CQS// MG-PM-119 / Développemen Component 2. Strengthenin t et mise en œuvre du systè Consultant Qualif 2018-04-2 2018-06-0 2018-07-0 2018-08-1 2019-02-0 IDA / D1720 g capacities for priority fish Post Open - National 5,000.00 0.00 Canceled 2018-04-02 me de collecte de données p ication Selection 3 6 6 0 6 eries management our les pêcheries traditionne lles, y compris une stratégie d'échantillonnage approprié e MG-MRHP-28665-CS-CQS// Component 2. Strengthenin MG-PM-120 / Collecte des do Consultant Qualif 2018-03-2 2018-05-0 2018-06-0 2018-07-0 2019-01-0 IDA / D1720 g capacities for priority fish Post Open - National 35,000.00 0.00 Canceled 2018-03-01 nnées au niveau des régions ication Selection 2 5 4 9 5 eries management prioritaires (Artfish) MG-MRHP-28668-CS-CQS// Component 2. Strengthenin Consultant Qualif 2018-02-2 2018-04-0 2018-05-0 2018-06-1 2018-12-0 MG-PM-121 / Mise à jour de l IDA / D1720 g capacities for priority fish Post Open - National 50,000.00 0.00 Canceled 2018-02-01 ication Selection 2 7 7 1 8 'Enquête Cadre Nationale eries management MG-MRHP-28669-CS-CQS// Component 2. Strengthenin MG-PM-122 / Développemen Consultant Qualif 2018-03-0 2018-04-2 2018-05-2 2018-06-2 2018-12-2 IDA / D1720 g capacities for priority fish Post Open - National 30,000.00 0.00 Canceled 2018-02-15 t et mise en œuvre de la col ication Selection 8 1 1 5 2 eries management lecte de données pour les pr oduits post-capture MG-MRHP-28679-CS-CQS// Component 2. Strengthenin MG-PM-126 / Développemen Consultant Qualif 2018-09-2 2018-11-0 2018-12-0 2019-01-1 2019-07-1 IDA / D1720 g capacities for priority fish Post Open - National 10,000.00 0.00 Canceled 2018-09-03 t d'un système d'information ication Selection 4 7 7 1 0 eries management halieutique modulaire MG-MRHP-28682-CS-CQS// Component 2. Strengthenin Consultant Qualif 2018-05-2 2018-07-0 2018-08-0 2018-09-0 2019-03-0 MG-PM-127 / Suivi du systè IDA / D1720 g capacities for priority fish Post Open - National 10,000.00 0.00 Canceled 2018-04-30 ication Selection 1 4 3 7 6 me d'information halieutiqu eries management e modulaire MG-MRHP-28686-CS-CQS// Component 2. Strengthenin MG-PM-129 / Étude d'impact Consultant Qualif 2018-06-0 2018-07-1 2018-08-1 2018-09-2 2019-03-2 IDA / 59870 g capacities for priority fish Post Open - National 66,000.00 0.00 Canceled 2018-05-15 environnemental et social d ication Selection 5 9 8 2 1 eries management e l'extension ou de la constr uction MG-MRHP-28687-CS-QCBS// Component 2. Strengthenin Quality And Cost- Open - Internation 2018-04-0 2018-06-1 2018-07-0 2018-08-0 2018-09-1 2018-10-3 2019-10-3 MG-PM-130 / Élaboration str IDA / 59870 g capacities for priority fish Post 50,000.00 0.00 Canceled 2018-03-15 Based Selection al 5 0 8 7 8 0 0 atégie nationale de recherch eries management es halieutiques MG-MRHP-28690-CS-CQS// Component 2. Strengthenin Consultant Qualif Open - Internation 2018-07-0 2018-08-1 2018-09-1 2018-10-2 2019-04-2 MG-PM-134 / Etude sur les IDA / 59870 g capacities for priority fish Post 30,000.00 0.00 Canceled 2018-06-15 ication Selection al 6 9 8 3 1 mesures de gestion des pou eries management lpes MG-MRHP-28691-CS-QCBS// Component 2. Strengthenin MG-PM-135 / Avis scientifiqu Quality And Cost- Open - Internation 2018-07-2 2018-09-2 2018-10-2 2018-11-2 2019-01-0 2019-02-0 2020-02-0 IDA / 59870 g capacities for priority fish Post 30,000.00 0.00 Canceled 2018-06-29 e pour la gestion des pêcher Based Selection al 0 4 2 1 2 6 6 eries management ies de langoustes, dans les sites prioritaires MG-MRHP-28693-CS-QCBS// MG-PM-137 / Révision du sys Component 2. Strengthenin Quality And Cost- Open - Internation 2018-02-0 2018-04-1 2018-05-1 2018-06-0 2018-07-2 2018-08-2 2019-08-2 tème de suivi de la pêche cr IDA / 59870 g capacities for priority fish Post 75,000.00 0.00 Canceled 2018-01-15 Based Selection al 5 2 0 9 1 5 5 evettière traditionnelle (PCT eries management ) et élargissement à toutes l es zones de pêche MG-MRHP-28694-CS-CQS// Component 2. Strengthenin MG-PM-138 / Révision par le Consultant Qualif Open - Internation 2018-02-2 2018-04-0 2018-05-0 2018-06-1 2018-12-0 IDA / 59870 g capacities for priority fish Post 75,000.00 0.00 Canceled 2018-02-01 s pairs des modèles d'évalu ication Selection al 2 7 7 1 8 eries management ation des stock de crevettes MG-MRHP-28695-CS-CQS// Component 2. Strengthenin MG-PM-139 / Etat des lieux e Consultant Qualif Open - Internation 2018-06-2 2018-08-0 2018-09-0 2018-10-0 2019-04-0 IDA / 59870 g capacities for priority fish Post 10,000.00 0.00 Canceled 2018-05-30 t évaluation des besoins du ication Selection al 0 3 2 7 5 eries management Ministère en moyens et équi pements MG-MRHP-28703-CS-QCBS// MG-PM-145 / Élaboration du Component 2. Strengthenin Quality And Cost- 2018-02-2 2018-04-2 2018-05-1 2018-07-0 2018-08-0 2018-09-1 2019-09-1 plan d'action national sur les IDA / 59870 g capacities for priority fish Post Open - National 60,000.00 0.00 Canceled 2018-01-30 Based Selection 0 0 8 2 6 0 0 requins, les oiseaux de mer, eries management les tortues mrines, (résolutio n CTOI) MG-MRHP-28706-CS-QCBS// Component 2. Strengthenin Quality And Cost- 2018-10-0 2018-12-1 2019-01-1 2019-02-2 2019-03-3 2019-05-0 2020-05-0 MG-PM-149 / Étude sur l'am IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 Canceled 2018-09-17 Based Selection 8 3 0 4 1 5 4 élioration du protocole stand eries management ard de pêche MG-MRHP-28707-CS-CQS// MG-PM-150 / Étude sur l'éval Component 2. Strengthenin Consultant Qualif 2018-10-0 2018-11-2 2018-12-2 2019-01-2 2019-07-2 uation des impacts des diffé IDA / 59870 g capacities for priority fish Post Open - National 30,000.00 0.00 Canceled 2018-09-17 ication Selection 8 1 1 5 4 rents engins (palangres, filet eries management s, ...) sur les espèces menac ées (requins, tortues, ...) MG-MRHP-28709-CS-CQS// Component 2. Strengthenin MG-PM-128 / Étude techniqu Consultant Qualif 2018-03-0 2018-04-2 2018-05-2 2018-06-2 2018-12-2 IDA / 59870 g capacities for priority fish Post Open - National 67,500.00 0.00 Canceled 2018-02-15 e de l'extension ou construc ication Selection 8 1 1 5 2 eries management tion du bureau régional MG-MRHP-28713-CS-QCBS// Component 2. Strengthenin MG-PM-155 / Études techniq Quality And Cost- 2018-02-2 2018-04-2 2018-05-2 2018-07-0 2018-08-2 2018-10-0 2019-10-0 IDA / D1720 g capacities for priority fish Post Open - National 60,000.00 0.00 Canceled 2018-01-30 ues sur la stratégie de surve Based Selection 0 7 5 9 0 1 1 eries management illance et sur le fonctionnem ent du CSP MG-MRHP-28728-CS-CQS// Component 2. Strengthenin Consultant Qualif Open - Internation 2018-02-2 2018-04-2 2018-06-1 2018-07-2 2019-01-1 MG-PM-156 / Rédaction d'un IDA / 59870 g capacities for priority fish Post 15,000.00 0.00 Canceled 2018-01-30 ication Selection al 0 7 1 3 9 plan national de lutte contre eries management la pêche INN MG-MRHP-28732-CS-CQS// MG-PM-158 / Etude et élabor Component 2. Strengthenin ation de mécanisme structur Consultant Qualif Open - Internation 2018-02-2 2018-04-1 2018-05-1 2018-06-2 2018-12-2 IDA / 59870 g capacities for priority fish Post 50,000.00 0.00 Canceled 2018-01-30 el de plateforme de cogestio ication Selection al 0 2 2 3 0 eries management n des filières prioritaires (cra bes, poulpes, langoustes, ho lothuries, crevettes) MG-MRHP-28733-CS-QCBS// Component 2. Strengthenin Quality And Cost- 2018-03-0 2018-05-1 2018-06-1 2018-07-2 2018-09-0 2018-10-1 2019-10-1 MG-PM-163 / Suivi-évaluatio IDA / 59870 g capacities for priority fish Post Open - National 10,000.00 0.00 Canceled 2018-02-15 Based Selection 8 3 0 5 5 7 7 n des formations et recyclag eries management es réalisés MG-MRHP-28747-CS-QCBS// Component 3. Strengthenin MG-PM-172 / Mise en place g capacities for engaging in Quality And Cost- Open - Internation 2018-08-2 2018-10-2 2018-11-2 2019-01-0 2019-02-1 2019-03-3 2020-03-3 IDA / 59870 Post 25,000.00 0.00 Canceled 2018-07-30 d'une règlementation de bas alternative fishing practices Based Selection al 0 5 2 6 7 1 0 e concernant la sécurité en and livelihoods activities mer de la petite pêche MG-MRHP-28748-CS-QCBS// Component 3. Strengthenin MG-PM-173 / " Étude de mar g capacities for engaging in Quality And Cost- Open - Internation 2018-04-2 2018-06-2 2018-07-2 2018-09-0 2018-10-1 2018-11-2 2019-11-2 ché pour les produits de pêc IDA / 59870 Post 90,000.00 0.00 Canceled 2018-03-30 alternative fishing practices Based Selection al 0 5 3 6 8 9 9 he valorisés dans chaque ré and livelihoods activities gion ultra prioritaire " MG-MRHP-28763-CS-QCBS// Component 3. Strengthenin MG-PM-185 / Gestion et mis g capacities for engaging in Quality And Cost- Open - Internation 2018-11-2 2019-01-1 2019-02-1 2019-04-0 2019-05-0 2019-06-1 2020-06-0 IDA / V0500 Post 40,000.00 0.00 Canceled 2018-10-30 e en œuvre : Suivi évaluatio alternative fishing practices Based Selection al 0 8 5 1 6 0 9 n des bases de données and livelihoods activities MG-MRHP-28766-CS-LCS//M Component 4. Project mana Least Cost Select Open - Internation 2018-02-2 2018-04-0 2018-05-0 2018-06-0 2018-07-0 2018-08-1 2019-02-0 G-PM-189 / Audit externe de IDA / 59870 Post 15,000.00 0.00 Canceled 2018-01-30 gement and coordination ion al 0 5 3 2 7 1 7 s comptes du Projet MG-MRHP-14953-CS-LCS//P Component 2. Strengthenin Least Cost Select Open - Internation 2018-03-2 2018-05-1 2018-05-2 2018-05-2 2018-06-1 2018-07-1 2019-01-1 A67 / PA 67: Recensement d IDA / Q9790 g capacities for priority fish Post 75,000.00 0.00 Canceled 2018-03-15 ion al 9 3 0 7 7 5 1 es données au niveau des ré eries management gions prioritaires MG-MRHP-14945-CS-CQS//P Component 2. Strengthenin Consultant Qualif Open - Internation 2018-01-0 2018-03-1 2018-04-2 2018-06-0 2018-12-0 A 15 / PA 15: Recueillir et an IDA / Q9790 g capacities for priority fish Post 75,000.00 0.00 Canceled 2017-12-15 ication Selection al 5 2 6 7 4 alyser des informations de b eries management ase avant-projet MG-MRHP-86202-CS-QCBS// PA61 / Recrutement d'une fi Component 2. Strengthenin Quality And Cost- Open - Internation 2016-09-2 2018-12-2 2019-02-1 2017-06-0 2019-03-2 2017-07-1 2019-04-1 2017-08-0 2019-06-1 2018-07-0 2019-08-1 2018-10-1 2020-08-1 rme afin d'appuyer la mise e IDA / 59870 g capacities for priority fish Post 262,000.00 317,899.36 Terminated 2018-11-20 Based Selection al 0 0 8 6 0 7 9 4 8 5 7 2 6 n place d'outils d'aménage eries management ment des pêcheries à Mada gascar MG-MRHP-86206-CS-LCS//M Component 4. Project mana Least Cost Select Open - Internation 2019-02-0 2018-12-3 2019-03-1 2019-02-1 2019-04-2 2019-03-1 2019-06-1 2019-03-2 2019-08-2 2019-03-2 2019-11-1 2019-04-1 2020-05-0 2021-04-2 G-PM 88/18 / Audit externe IDA / 59870 Post 45,000.00 14,382.71 Completed 2018-11-30 gement and coordination ion al 5 0 5 5 9 5 3 1 7 6 0 6 8 1 des comptes du Projet 2018- 2019-2020 MG-MRHP-119249-CS-QCBS Component 3. Strengthenin / Etude technique et étude d g capacities for engaging in Quality And Cost- 2019-08-0 2019-10-3 2019-12-1 2020-01-1 2020-03-2 2020-06-1 2021-06-1 IDA / 59870 Post Open - National 20,000.00 0.00 Canceled 2019-07-03 'Impact Environnemental Ré alternative fishing practices Based Selection 2 1 5 4 9 2 2 habilitation du CFPT and livelihoods activities MG-MRHP-28674-CS-QCBS// MG-PM-125 / Développemen Component 2. Strengthenin Quality And Cost- 2019-08-2 2019-11-1 2019-12-1 2020-01-1 2020-03-1 2020-05-1 2021-05-1 t de la base de données pou IDA / 59870 g capacities for priority fish Post Open - National 46,000.00 0.00 Canceled 2019-07-30 Based Selection 9 2 2 1 1 0 0 r la pêche traditionnelle MA eries management RITIME et CONTINENTALE (c onsultant) Page 6 MG-MRHP-28755-CS-QCBS// MG-PM-177 / Élaboration de Component 3. Strengthenin s Plans d'Action aux restricti g capacities for engaging in Quality And Cost- Open - Internation 2019-08-2 2019-09-0 2019-08-3 2019-11-0 2020-01-2 2019-12-0 2020-02-2 2019-12-3 2020-04-0 2020-02-0 2020-04-1 2020-03-1 2021-02-0 2021-03-1 IDA / 59870 Post 270,000.00 408,313.76 Signed 2019-08-15 ons de Ressources (PARAR)/ alternative fishing practices Based Selection al 2 5 0 3 9 1 8 1 7 4 3 0 6 0 Diagnostic des besoins en a and livelihoods activities ctivités alternatives adaptée s à chaque région ultra prior itaire (AGR) MG-MRHP-105669-CS-QCBS Component 3. Strengthenin / Recrutement d'agence de g capacities for engaging in Quality And Cost- 2019-02-0 2019-09-2 2019-11-0 2019-05-0 2019-12-0 2019-06-1 2020-01-0 2019-06-1 2020-02-0 2019-06-2 2020-03-1 2019-07-1 2021-03-1 2019-09-1 communication pour la conc IDA / 59870 Post Open - National 33,750.00 21,553.74 Completed 2019-09-02 alternative fishing practices Based Selection 7 3 6 2 4 2 3 2 7 1 3 6 3 7 eption et production des sup and livelihoods activities ports de communications rel atifs au MDGP MG-MRHP-28174-CS-QCBS / Etude sur le circuit de comm Component 3. Strengthenin ercialisation des produits de g capacities for engaging in Quality And Cost- Open - Internation 2019-06-1 2019-09-2 2019-11-0 2019-10-0 2019-12-0 2019-11-1 2020-01-0 2020-01-1 2020-02-0 2020-02-0 2020-03-1 2020-06-0 2021-03-1 2021-05-1 IDA / 59870 Post 130,000.00 100,145.61 Completed 2019-09-02 s pêches frais et identificatio alternative fishing practices Based Selection al 8 3 6 9 4 1 3 3 7 3 3 6 3 3 n des techniques de transfor and livelihoods activities mation adaptées pour chaqu e ZUP MG-MRHP-19124-CS-QCBS PA48 / Etablissement de la S Component 4. Project mana Quality And Cost- Open - Internation 2017-08-0 2017-07-1 2017-09-0 2017-08-3 2017-09-2 2017-10-2 2017-12-0 2018-01-0 2019-01-0 ituation de référence du Cad IDA / Q9790 Post 75,000.00 0.00 Canceled 2017-06-27 gement and coordination Based Selection al 1 8 6 1 8 8 2 6 6 re de résultats et développe ment d'un système de gesti on de projet MG-MRHP-28701-CS-QCBS// Component 2. Strengthenin MG-PM-144 / Étude pour la d Quality And Cost- 2018-05-0 2018-07-0 2018-08-0 2018-09-1 2018-10-2 2018-11-2 2019-11-2 IDA / 59870 g capacities for priority fish Post Open - National 10,000.00 0.00 Canceled 2018-04-16 éfinition des termes de référ Based Selection 7 5 2 6 1 5 5 eries management ences du Service de Gestion de la Pêche Thonière MG-MRHP-28759-CS-QCBS// Component 3. Strengthenin MG-PM-182 / Préparation du g capacities for engaging in Quality And Cost- Open - Internation 2018-04-2 2018-06-1 2018-07-1 2018-08-3 2018-10-0 2018-11-0 2019-11-0 IDA / V0500 Post 251,100.00 0.00 Canceled 2018-03-30 plan local d'électrification co alternative fishing practices Based Selection al 0 8 6 0 4 8 8 mmunautaire : prestations i and livelihoods activities nternationales MG-MRHP-28753-CS-QCBS// Component 3. Strengthenin MG-PM-176 / Évaluation des g capacities for engaging in Quality And Cost- Open - Internation 2018-10-0 2018-12-0 2018-12-3 2019-01-3 2019-03-0 2019-04-1 2020-04-0 IDA / 59870 Post 90,000.00 0.00 Canceled 2018-09-14 impacts socio-économiques alternative fishing practices Based Selection al 5 3 1 0 6 0 9 de la mise pratique des acti and livelihoods activities vités alternatives MG-MRHP-28741-CS-QCBS// Component 3. Strengthenin MG-PM-168 / Étude sur l'ide g capacities for engaging in Quality And Cost- Open - Internation 2019-11-1 2020-01-2 2021-04-2 2021-06-1 2021-08-1 2021-09-2 2022-09-2 ntification de techniques mo IDA / 59870 Post 100,000.00 0.00 Canceled 2019-09-30 alternative fishing practices Based Selection al 4 8 8 2 1 2 2 dernes de pêche et de fabric and livelihoods activities ation d'engins de pêche ada ptés pour chaque ZUP MG-MRHP-14947-CS-QCBS// PA63 / PA 63: Elaboration de Component 2. Strengthenin Quality And Cost- Open - Internation 2017-05-3 2017-07-2 2017-08-0 2017-08-1 2017-09-0 2017-09-3 2018-09-3 s plans d'action nationaux s IDA / Q9790 g capacities for priority fish Prior 60,000.00 0.00 Canceled 2017-05-17 Based Selection al 1 9 5 2 2 0 0 ur les requins, les oiseaux d eries management e mer et les tortues marines (résolutions CTOI) MG-MRHP-28746-CS-QCBS// MG-PM-171 / Identification d e matériels de sécurité adap Component 3. Strengthenin tés aux différentes catégorie g capacities for engaging in Quality And Cost- Open - Internation 2018-04-2 2018-06-2 2018-07-2 2018-09-0 2018-10-1 2018-11-2 2019-11-2 IDA / 59870 Post 180,000.00 0.00 Canceled 2018-03-30 s d'embarcation et de navig alternative fishing practices Based Selection al 0 5 3 6 8 9 9 ation, stratégie de mis à dis and livelihoods activities position des équipements, d' organisation de secours et l a diffusion des informations météorologiques MG-MRHP-28761-CS-QCBS// Component 3. Strengthenin MG-PM-183 / Préparation du g capacities for engaging in Quality And Cost- Open - Internation 2018-04-0 2018-06-0 2018-07-0 2018-08-1 2018-09-1 2018-10-2 2019-10-2 IDA / V0500 Post 33,800.00 0.00 Canceled 2018-03-15 plan local d'électrification co alternative fishing practices Based Selection al 5 3 1 5 9 4 4 mmunautaire : prestations n and livelihoods activities ationales MG-MRHP-127605-CS-CQS / Component 2. Strengthenin Consultant Qualif Open - Internation 2019-10-0 2019-12-0 2020-01-0 2020-02-2 2020-08-2 Etude sur les accidents en IDA / 59870 g capacities for priority fish Post 90,000.00 0.00 Canceled 2019-09-06 ication Selection al 6 5 4 4 2 mer de la pêche à petite éch eries management elle MG-MRHP-28697-CS-CQS// MG-PM-140 / Étude sur l'ada Component 2. Strengthenin Consultant Qualif Open - Internation 2018-05-2 2018-07-0 2018-08-0 2018-09-0 2019-03-0 ptation des missions et attri IDA / 59870 g capacities for priority fish Post 10,000.00 0.00 Canceled 2018-04-30 ication Selection al 1 4 3 7 6 butions du MRHP par rappor eries management t au défi du développement rural MG-MRHP-23763-CS-QCBS// MG-PM-117 / Recrutement d' Component 3. Strengthenin un Cabinet d'étude ou d'une g capacities for engaging in Quality And Cost- 2017-10-3 2017-10-0 2017-12-0 2017-12-1 2018-09-1 2018-01-0 2019-02-0 2018-02-0 2018-03-2 2018-05-0 2020-04-3 ONG pour assurer les missio IDA / Q9790 Prior Open - National 600,000.00 0.00 Canceled 2017-09-14 alternative fishing practices Based Selection 0 5 1 0 8 7 7 6 0 1 0 ns de l'AGEX pour l'appui à l and livelihoods activities a mise en œuvre du Plan d'A ménagement Concerté des Pêcheries de la Région Mela ky MG-MRHP-23508-CS-QCBS// MG-MP-117 / Recrutement d e Cabinet d'étude ou d'une Component 3. Strengthenin ONG pour assurer les missio g capacities for engaging in Quality And Cost- 2017-10-3 2017-10-0 2018-08-2 2017-12-1 2018-09-1 2018-01-0 2019-02-0 2018-02-0 2019-09-0 2018-03-2 2018-05-0 2020-04-3 ns de l'AGEX pour l'appui à l IDA / Q9790 Prior Open - National 600,000.00 0.00 Canceled 2017-09-14 alternative fishing practices Based Selection 0 5 9 0 8 7 7 6 5 0 1 0 a mise en œuvre du Plan d'A and livelihoods activities ménagement des Pêcheries des Baies d'Ampasindava, d e Tsimipaika, d'Ambaro, et l' archipel de Nosy Be (BATAN ) MG-MRHP-23508-CS-BQS / Recrutement d'une agence Component 3. Strengthenin d'exécution pour l'appui à la g capacities for engaging in Quality Based Sel 2020-01-0 2017-10-0 2020-01-0 2017-11-1 2020-01-2 2017-12-1 2019-02-0 2018-01-1 2020-02-1 2018-02-1 2020-04-1 2018-03-2 2020-05-0 2019-03-2 mise en œuvre du Plan d'Am IDA / Q9790 Prior Open - National 1,600,000.00 1,517,925.94 Signed 2017-09-14 alternative fishing practices ection 7 5 9 8 3 6 7 5 1 4 4 1 9 1 énagement des Pêcheries d and livelihoods activities es Baies d'Ampasindava, de Tsimipaika, d'Ambaro, et l « archipel de Nosy Be (BATAN ) MG-MRHP-23763-CS-BQS / Component 3. Strengthenin Recrutement d'une agence g capacities for engaging in Quality Based Sel 2019-12-1 2017-10-0 2020-01-0 2017-11-1 2020-01-2 2017-12-1 2019-02-0 2018-01-1 2020-02-1 2018-02-1 2020-05-2 2018-03-2 2020-06-1 2021-03-2 d'exécution pour l'appui à la IDA / Q9790 Prior Open - National 900,000.00 647,158.90 Signed 2017-09-14 alternative fishing practices ection 8 5 9 8 3 6 7 5 1 4 0 1 6 0 mise en œuvre du Plan d'Am and livelihoods activities énagement Concerté des Pê cheries de la Région Melaky MG-MRHP-150365-CS-CQS / RECRUTEMENT D'UN CONSU LTANT NATIONAL POUR LE R ENFORCEMENT DE CAPACIT Component 2. Strengthenin Consultant Qualif Under Implemen 2020-03-1 2019-12-3 2020-09-1 2020-01-2 2020-03-0 2020-03-2 2020-05-2 E DU PERSONNEL DE L’AUT IDA / 59870 g capacities for priority fish Post Open - National 15,140.00 0.00 2019-12-24 ication Selection tation 1 1 4 8 8 2 1 ORITE SANITAIRE HALIEUTIQ eries management UE PAR UNE FORMATION EN LINGUISTIQUE (ANGLAIS / CHINOIS) AU NIV EAU NATIONAL (2.1.7.2.04) MG-MRHP-28740BIS-CS-QC BS // MG-PM-167 / Etude sur Component 3. Strengthenin l'amélioration des embarcati g capacities for engaging in Quality And Cost- Under Implemen 2020-02-2 2020-03-0 2020-03-1 2020-04-1 2020-05-1 2020-06-0 2020-07-0 2020-07-1 2021-03-2 IDA / 59870 Post Open - National 90,000.00 0.00 2020-02-25 ons existantes à partir des alternative fishing practices Based Selection tation 7 3 8 6 6 6 4 8 5 matériaux locaux bon march and livelihoods activities é et existants pour chaque Z UP (3.2.1.1.12) MG-MRHP-28740-CS-QCBS// Component 3. Strengthenin MG-PM-167 / Étude sur l'am g capacities for engaging in Quality And Cost- Open - Internation 2019-08-1 2018-05-2 2019-08-1 2018-07-2 2018-08-2 2018-10-0 2018-11-1 2018-12-3 2019-12-3 élioration des embarcations IDA / 59870 Post 60,000.00 0.00 Canceled 2018-04-30 alternative fishing practices Based Selection al 1 1 9 6 3 7 8 0 0 existantes à partir des maté and livelihoods activities riaux locaux bon marché et existants MG-MRHP-86203BIS-CS-QC BS / Recrutement d'une Fir me pour Appui à la Mise à jo ur de la Stratégie Nationale Component 2. Strengthenin Quality And Cost- Under Implemen 2020-02-2 2020-03-0 2020-03-0 2020-04-1 2020-05-1 2020-06-0 2020-07-1 2020-07-2 2020-12-1 pour le Développement de l’ IDA / 59870 g capacities for priority fish Post Open - National 50,000.00 0.00 2020-02-28 Based Selection tation 5 6 7 9 9 9 4 8 5 Aquaculture à Madagascar ( eries management SNDAM) et Elaboration des P lans de Développement des trois (3) filières « d’algocultu re, d’holothuriculture et de c rabicultu MG-MRHP-119284-CS-QCBS / Recrutement d'un BE pour Etudes techniques, étude d’i Component 3. Strengthenin mpact environnemental et s g capacities for engaging in Quality And Cost- Open - Internation 2020-03-1 2020-03-2 2020-03-1 2020-05-1 2020-06-1 2020-06-0 2020-07-1 2020-06-3 2020-08-1 2020-08-0 2020-11-0 2020-08-2 2021-03-1 2022-03-2 ocial et contrôle et surveilla TF / A4588 Post 44,000.00 56,927.90 Signed 2020-03-06 alternative fishing practices Based Selection al 0 7 8 0 6 9 6 0 3 4 5 5 8 8 nce des travaux pour la con and livelihoods activities struction des bâtiments du k iosque de pré-électrification et du « Complexe-pêche » d ans 2 villages à Mananara N ord MG-MRHP-86203-CS-QCBS// PA13 / Mise à jour de la Stra Component 2. Strengthenin Quality And Cost- Open - Internation 2020-02-0 2019-08-3 2019-11-1 2019-12-2 2020-02-1 2020-04-1 2020-06-1 2021-06-1 tégie Nationale de l’Aquacul IDA / 59870 g capacities for priority fish Post 30,000.00 0.00 Canceled 2019-07-31 Based Selection al 4 0 3 8 1 1 0 0 ture (Consultant national + eries management Réunions (1 consultation, 1 validation) MG-MRHP-14952-CS-LCS//P A66 / PA 66: Etudes d'Impac t environnemental et Socail : - Clôture de l'enceinte DRRH Component 2. Strengthenin Consultant Qualif Open - Internation 2017-07-1 2017-08-3 2017-09-3 2017-11-0 2018-05-0 P Fénérive IDA / Q9790 g capacities for priority fish Post 35,000.00 0.00 Canceled 2017-06-27 ication Selection al 8 1 0 4 3 - Construction des Bureaux eries management de 06 DRRHP - Extension de l'ASH à Antsir anana et Morondava - Construction local pour bur eau UGP MG-MRHP-168222-CS-QCBS / Recrutement d'un BE pour la réalisation des études tec Component 2. Strengthenin Quality And Cost- Under Implemen 2020-04-1 2020-05-0 2020-04-2 2020-06-2 2020-07-1 2020-08-1 2020-09-2 2020-10-2 2021-05-3 hniques- du PGES et du cont IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 2020-04-17 Based Selection tation 5 8 7 1 9 8 2 7 0 rôle et surveillance des cons eries management tructions des bureaux admin istratifs de l'ASH à Manakara et Mananjary MG-MRHP-168223-CS-QCBS / Recrutement d'un BE pour la réalisation des études tec Component 2. Strengthenin Quality And Cost- Under Implemen 2020-04-1 2020-05-0 2020-04-2 2020-06-2 2020-08-1 2020-07-1 2020-09-1 2020-08-1 2020-12-1 2020-09-2 2021-10-2 2020-10-2 2021-05-3 hniques- du PGES et du cont IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 2020-04-17 Based Selection tation 5 8 7 1 7 9 7 8 6 2 5 7 0 rôle et surveillance des cons eries management tructions des bureaux admin istratifs de l'ASH-OEPA à An tananarivo MG-MRHP-168224-CS-QCBS / Recrutement d'un BE pour la réalisation des études tec Component 2. Strengthenin Quality And Cost- Under Implemen 2020-04-1 2020-05-0 2020-04-2 2020-06-2 2020-07-1 2020-08-1 2020-09-2 2020-10-2 2021-05-3 hniques- du PGES et du cont IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 2020-04-17 Based Selection tation 5 8 7 1 9 8 2 7 0 rôle et surveillance des cons eries management tructions des bureaux admin istratifs de l'ASH-USTA-SRPA à Majunga MG-MRHP-168226-CS-QCBS / Recrutement d'un BE pour Component 2. Strengthenin la réalisation des études tec Quality And Cost- 2020-04-1 2020-05-0 2020-04-2 2020-06-2 2020-08-2 2020-07-1 2020-09-2 2020-08-1 2020-12-1 2020-09-2 2021-02-0 2020-10-2 2021-03-1 2021-05-3 IDA / 59870 g capacities for priority fish Post Open - National 10,000.00 15,378.80 Signed 2020-04-17 hniques- du PGES et du cont Based Selection 5 8 7 1 0 9 8 8 8 2 1 7 8 0 eries management rôle et surveillance des cons tructions des bureaux admin istratifs de l'ASH à Toliara MG-MRHP-168227-CS-QCBS / Recrutement d'un BE pour Component 2. Strengthenin la réalisation des études tec Quality And Cost- 2020-04-1 2020-05-0 2020-04-2 2020-06-2 2020-08-1 2020-07-1 2020-09-1 2020-08-1 2021-02-1 2020-09-2 2021-06-2 2020-10-2 2021-09-3 2021-05-3 IDA / 59870 g capacities for priority fish Post Open - National 10,000.00 25,713.74 Signed 2020-04-17 hniques- du PGES et du cont Based Selection 5 8 7 1 4 9 4 8 6 2 3 7 0 0 eries management rôle et surveillance des cons tructions des bureaux admin istratifs de l'ASH à Fort-Dau phin Page 7 MG-MRHP-168225-CS-QCBS / Recrutement d'un BE pour la réalisation des études tec Component 2. Strengthenin Quality And Cost- Under Implemen 2020-04-1 2020-05-0 2020-04-2 2020-06-2 2020-07-1 2020-08-1 2020-09-2 2020-10-2 2021-05-3 hniques- du PGES et du cont IDA / 59870 g capacities for priority fish Post Open - National 30,000.00 0.00 2020-04-17 Based Selection tation 5 8 7 1 9 8 2 7 0 rôle et surveillance des cons eries management tructions des bureaux admin istratifs de l'ASH-SRPA-OEPA à Diégo Suarez MG-MRHP-169196-CS-QCBS / RECRUTEMENT D’UNE FIRM E EN CHARGE DE L’ELABOR Component 3. Strengthenin ATION DES PCD ET PDF DE g capacities for engaging in Quality And Cost- 2020-05-0 2020-05-2 2020-05-1 2020-07-0 2020-10-2 2020-08-0 2020-12-0 2020-08-3 2021-04-2 2020-10-0 2021-06-0 2020-11-0 2021-09-0 2021-09-0 S COMMUNES POUR LES 3 Z IDA / 59870 Post Open - National 300,000.00 157,999.04 Signed 2020-04-30 alternative fishing practices Based Selection 4 1 6 4 0 1 2 1 6 5 2 9 9 5 UPs ET REPARTIE EN TROIS and livelihoods activities LOTS: Lot 1: ZUP BA, Lot 2: ZUP BATAN Lot 3: ZUP MELAKY MG-MRHP-170094-CS-CQS / Recrutement d’un consultan Component 2. Strengthenin Consultant Qualif 2020-05-1 2020-05-2 2020-05-1 2020-06-2 2021-05-1 2020-07-2 2021-12-1 2020-08-2 2022-02-0 2021-02-2 t chargé de la traduction et IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 74,211.00 Signed 2020-04-30 ication Selection 4 1 6 5 9 5 6 9 5 5 de la synthèse des documen eries management ts du français et anglais au malagasy officiel MG-MRHP-170870-CS-QCBS / Recrutement d'une firme p Component 2. Strengthenin Quality And Cost- Under Implemen 2020-05-0 2020-05-2 2020-05-1 2020-07-0 2020-08-0 2020-09-0 2020-10-0 2020-11-1 2022-02-1 our l’élaboration du Plan d’A IDA / 59870 g capacities for priority fish Post Open - National 75,000.00 0.00 2020-05-04 Based Selection tation 4 5 6 8 5 4 9 3 1 ménagement des Pêcheries eries management de la Région ATSIMO ATSINA NANA MG-MRHP-174365-CS-QCBS / Recrutement d'un Institut de Recherche ou d'une Firm Component 2. Strengthenin Quality And Cost- 2020-05-2 2020-06-1 2020-06-0 2020-07-3 2020-10-2 2020-08-2 2020-12-0 2020-09-2 2021-01-2 2020-10-3 2021-03-0 2020-12-0 2021-04-1 2022-02-2 e pour appuyer le Centre d’ IDA / 59870 g capacities for priority fish Post Open - National 75,000.00 338,974.11 Signed 2020-05-26 Based Selection 0 6 6 0 0 7 2 6 9 1 4 5 5 8 Etude et de Développement eries management des Pêches (CEDP) dans l’ét ude des stocks Halieutiques (Cinq filières Prioritaires) MG-MRHP-181840-CS-QCBS Component 3. Strengthenin / RECRUTEMENT D’UNE FIRM g capacities for engaging in Quality And Cost- Under Implemen 2020-06-3 2020-07-1 2020-07-1 2020-08-1 2020-09-1 2020-10-0 2020-11-1 2020-12-1 2021-12-1 E POUR LA FORMATION DES IDA / 59870 Post Open - National 50,000.00 0.00 2020-07-02 alternative fishing practices Based Selection tation 0 2 6 6 5 6 0 5 5 GROUPEMENTS DE PÊCHEU and livelihoods activities RS SUR LES TECHNIQUES C OMMERCIALES MG-MRHP-182950-CS-CQS / Recrutement d'agence de co Component 3. Strengthenin mmunication pour la concep g capacities for engaging in Consultant Qualif 2020-08-1 2020-08-0 2020-08-2 2020-09-1 2021-10-0 2020-10-1 2022-03-3 2020-11-2 2022-04-1 2021-05-2 tion et production des suppo IDA / 59870 Post Open - National 25,000.00 61,842.50 Signed 2020-07-14 alternative fishing practices ication Selection 3 4 6 7 5 7 0 1 4 0 rts de communications relati and livelihoods activities fs au MDGP 2020 et pour la mise en oeuvre du plan de c ommunication du projet SWI Ofish2 MG-MRHP-181871-CS-QCBS / Recrutement d’ONG pour l a conservation et la restaura Component 3. Strengthenin tion des forêts de mangrove g capacities for engaging in Quality And Cost- 2020-10-0 2020-07-3 2020-10-2 2020-09-1 2021-05-2 2020-10-1 2022-01-1 2020-11-0 2022-04-0 2020-12-0 2022-10-1 2020-12-2 2021-12-2 IDA / 59870 Prior Open - National 3,000,000.00 0.00 Signed 2020-07-21 , et la protection de récifs co alternative fishing practices Based Selection 7 1 1 3 5 3 3 3 7 8 3 9 9 ralliens et d’herbiers marins and livelihoods activities dans des zones riches en ha bitats naturels côtiers et ma rins de Madagascar, répartis en 6 Lots MG-MRHP-183755-CS-QCBS / Recrutement d'une firme p our la réalisation d’une enqu Component 4. Project mana Quality And Cost- 2020-07-2 2020-08-0 2020-08-0 2020-09-1 2020-10-1 2020-10-1 2020-11-1 2020-11-0 2020-12-0 2020-12-0 2021-02-1 2020-12-2 2021-03-3 2021-03-1 IDA / 59870 Post Open - National 75,000.00 79,586.86 Signed 2020-07-17 ête de satisfaction des béné gement and coordination Based Selection 2 7 7 1 3 1 3 1 3 6 5 0 1 0 ficiaires du projet et les me mbres de la communauté de s pêcheurs MG-MRHP-28698-CS-CQS// Component 2. Strengthenin Consultant Qualif 2020-07-2 2020-09-0 2020-10-0 2020-11-0 2021-05-0 MG-PM-141 / Assistant techn IDA / 59870 g capacities for priority fish Post Open - National 24,000.00 0.00 Canceled 2020-06-30 ication Selection 1 3 3 7 6 ique pour UGP eries management MG-MRHP-183758-CS-QCBS Component 2. Strengthenin / Recrutement d'une firme p Quality And Cost- 2020-09-0 2020-09-1 2020-09-1 2020-10-2 2020-11-2 2020-11-2 2021-01-1 2020-12-1 2021-02-0 2021-01-1 2021-03-0 2021-02-2 2021-04-3 2021-10-1 IDA / 59870 g capacities for priority fish Post Open - National 75,000.00 86,424.70 Signed 2020-08-27 our étudier la mise en place Based Selection 1 7 0 2 7 1 1 2 2 6 9 0 0 8 eries management des ZEA pêche et aquacultu re MG-MRHP-28689-CS-CQS// MG-PM-133 / Appui du centr Component 2. Strengthenin Consultant Qualif Open - Internation 2020-08-3 2020-11-1 2020-12-2 2021-03-1 2021-09-0 e de recherche par deux (02 IDA / 59870 g capacities for priority fish Post 150,000.00 0.00 Canceled 2020-07-31 ication Selection al 0 3 8 3 9 ) experts internationaux pou eries management r les évaluations de stocks d e 5 filières prioritaires MG-MRHP-190077-CS-CQS / Recrutement d'un cabinet d' Component 2. Strengthenin Consultant Qualif 2020-09-1 2020-09-2 2020-09-2 2020-11-0 2021-03-1 2020-12-0 2021-05-1 2021-01-0 2022-05-1 2021-03-0 étude pour effectuer une ét IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 50,426.00 Signed 2020-08-31 ication Selection 1 1 3 4 1 4 4 8 1 9 ude de faisabilité de l'éclose eries management rie en holothuries à Ambanj a MG-MRHP-28671-CS-QCBS// MG-PM-123 / Amélioration d e la base de données pour l Component 2. Strengthenin Quality And Cost- 2018-01-2 2018-03-3 2018-04-2 2018-05-2 2018-07-0 2018-08-1 2019-08-1 a déclaration des produits d IDA / D1720 g capacities for priority fish Post Open - National 20,000.00 0.00 Canceled 2018-01-02 Based Selection 3 0 7 7 8 9 9 e la pêche régionale (Base d eries management e données-Tableau de bord- Système d'Information Pêch e :basé sur le Web, consulta nt) MG-MRHP-198557-CS-QCBS / Recrutement des BE pour Component 3. Strengthenin réaliser les études techniqu g capacities for engaging in Quality And Cost- 2020-10-1 2020-11-0 2020-12-2 2021-04-0 2021-01-1 2021-11-0 2021-02-1 2021-05-1 2021-03-2 2021-07-1 2021-04-2 2021-11-0 2021-11-2 es et EIES de la construction TF / A4588 Post Open - National 130,000.00 108,278.08 Signed 2020-10-16 alternative fishing practices Based Selection 9 6 0 1 9 3 8 4 5 6 9 5 5 des bâtiments de pré-électri and livelihoods activities fication hors grille et comple xe pêche au niveau BATAN et Aniribe (BA) répartis en 4 Lots MG-MRHP-199272-CS-CQS / Recrutement d'un BE études Component 2. Strengthenin Consultant Qualif Under Implemen 2020-10-1 2020-11-0 2020-12-1 2021-03-1 2021-01-1 2021-02-1 2021-09-0 techniques- EIES et contrôle IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 2020-10-19 ication Selection tation 9 9 3 1 2 6 4 et surveillance des travaux eries management à la mise en place d'écloseri e_Ambanja MG-MRHP-203599-CS-CQS / Recrutement d’une firme po ur la conception et le dévelo ppement de site web pour l’ Component 2. Strengthenin Consultant Qualif 2020-11-2 2020-12-1 2020-11-2 2021-01-1 2021-03-2 2021-02-1 2021-06-0 2021-03-2 2021-09-2 2021-05-1 Observatoire Economique d IDA / Q9790 g capacities for priority fish Post Open - National 45,000.00 76,667.73 Signed 2020-11-20 ication Selection 1 1 6 5 3 4 8 1 5 0 e la Pêche et de l’Aquacultur eries management e (OEPA), pour le Centre d’E tudes et de Développement des Pêches (CEDP) et pour l’ Unité Statistique Thonière d’ Antsiran MG-MRHP-208296-CS-CQS / Recrutement d'un BE études techniques, EIES et C&S des Component 3. Strengthenin travaux pour la construction g capacities for engaging in Consultant Qualif 2021-01-1 2021-01-1 2021-01-1 2021-02-1 2021-03-2 2021-03-1 2021-06-1 2021-04-2 2021-09-1 2021-11-1 TF / A4588 Post Open - National 20,000.00 36,890.00 Signed 2020-12-21 des bâtiments du kiosque d alternative fishing practices ication Selection 2 1 9 4 6 6 0 0 4 6 e pré-électrification et du « and livelihoods activities Complexe-pêche » dans les villages d’Ambalahonko et A mpasimandroro district de M aintirano MG-MRHP-208303-CS-QCBS / Recrutement des BE pour r Component 3. Strengthenin éaliser les études technique g capacities for engaging in Quality And Cost- 2021-01-1 2021-01-1 2021-01-1 2021-02-2 2021-03-3 2021-03-2 2021-04-3 2021-04-2 2021-05-2 2021-05-3 2021-07-1 2021-07-0 2022-09-2 2022-01-3 IDA / 59870 Post Open - National 180,000.00 146,654.22 Signed 2020-12-21 s, PGES et et contrôle et sur alternative fishing practices Based Selection 2 1 9 4 1 6 0 5 5 0 9 4 2 0 veillance des travaux de con and livelihoods activities struction des petites infrast ructures de pêches répartis en 6 lots MG-MRHP-208305-CS-CQS / Component 2. Strengthenin Recrutement d'un BE pour l Consultant Qualif 2021-01-1 2021-01-1 2021-01-1 2021-02-2 2021-03-2 2021-03-2 2021-06-1 2021-04-3 2021-09-2 2021-09-2 IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 25,708.56 Signed 2020-12-21 e contrôle et surveillance de ication Selection 2 1 9 4 3 6 0 0 8 7 eries management s travaux des DRAEP à Andr oy, Anosy MG-MRHP-208306-CS-CQS / Component 2. Strengthenin Recrutement d'un BE pour l Consultant Qualif 2021-01-1 2021-01-1 2021-01-1 2021-02-2 2021-03-2 2021-03-2 2021-10-0 2021-04-3 2021-10-2 2021-09-2 IDA / 59870 g capacities for priority fish Post Open - National 8,000.00 15,062.89 Signed 2020-12-21 e contrôle et la surveillance ication Selection 2 1 9 4 3 6 4 0 1 7 eries management des travaux du DRAEP à Mai ntirano MG-MRHP-214299-CS-QCBS / Recrutement d’une firme p Component 2. Strengthenin Quality And Cost- 2021-01-2 2021-02-1 2021-02-0 2021-03-0 2021-03-3 2021-03-3 2021-04-3 2021-04-2 2021-05-1 2021-05-2 2021-06-0 2021-06-3 2021-09-1 2022-09-2 our l’élaboration du Plan d’A IDA / 59870 g capacities for priority fish Post Open - National 100,000.00 137,749.52 Signed 2021-01-29 Based Selection 8 3 4 1 0 1 0 1 4 6 7 0 4 3 ménagement des Pêcheries eries management (PAP) de la Région ANDROY MG-MRHP-216848-CS-CQS / Recrutement d'un BE pour ET, élaboration du PGES et C Component 3. Strengthenin &S relative à la construction g capacities for engaging in Consultant Qualif Under Implemen 2021-02-2 2021-03-1 2021-03-0 2021-04-1 2021-05-1 2021-06-1 2022-02-0 IDA / 59870 Post Open - National 33,000.00 0.00 2021-02-17 du bureau de la Circonscripti alternative fishing practices ication Selection tation 4 0 9 3 3 7 2 on en charge de la pêche et and livelihoods activities de l’Aquaculture et l’l’anten ne du Centre de Surveillanc e des Pêches (CSP) à Maintir ano MG-MRHP-218699-CS-CQS / Component 2. Strengthenin Recrutement d’une firme po Consultant Qualif Under Implemen 2021-02-2 2021-03-0 2021-03-0 2021-04-2 2021-05-2 2021-06-2 2021-10-2 IDA / 59870 g capacities for priority fish Post Open - National 30,000.00 0.00 2021-02-15 ur Etude des impacts du CO ication Selection tation 3 8 2 1 1 5 3 eries management VID19 sur la pêche à Madag ascar MG-MRHP-222309-CS-CQS / Recrutement d'une firme po Component 2. Strengthenin Consultant Qualif 2021-03-1 2021-03-3 2021-03-2 2021-05-1 2021-04-2 2021-06-1 2021-05-2 2021-07-1 2021-09-1 2021-09-0 ur réaliser un diagnostic inst IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 13,920.80 Signed 2021-03-17 ication Selection 4 1 6 4 1 3 8 8 4 1 itutionnel et organisationnel eries management de la mise en oeuvre du proj et SWIOFish2 MG-MRHP-222313-CS-QCBS / Recrutement d’une firme e n charge de l’identification d Component 3. Strengthenin es plans de pérennisation in g capacities for engaging in Quality And Cost- Under Implemen 2022-01-1 2021-04-0 2022-01-1 2021-05-2 2022-03-1 2021-06-2 2022-05-0 2021-07-2 2022-05-2 2021-08-2 2022-06-0 2021-09-2 2022-01-2 IDA / 59870 Post Open - National 90,000.00 0.00 2021-03-24 cluant un plan de gestion et alternative fishing practices Based Selection tation 2 7 7 1 7 0 3 0 4 4 3 8 6 un plan d’affaire des petites and livelihoods activities infrastructures de pêche et complexes pêches dans les zones ultra prioritaires BATA N, BA et MELAKY MG-MRHP-224627-CS-CQS / Component 2. Strengthenin Recrutement firme pour pro Consultant Qualif Under Implemen 2021-03-3 2021-04-2 2021-04-1 2021-06-0 2021-07-0 2021-08-0 2022-02-0 IDA / 59870 g capacities for priority fish Post Open - National 115,000.00 0.00 2021-03-30 spection nouvelles zones de ication Selection tation 0 0 5 3 3 7 3 eries management pêche langoustes MG-MRHP-223841-CS-CQS / Cabinet pour le recrutement Component 2. Strengthenin Consultant Qualif 2021-05-0 2021-04-2 2021-06-0 2021-09-2 2021-07-0 2021-12-2 2021-08-0 2022-03-2 2021-10-0 de 75 enquêteurs pour le dé IDA / Q9790 g capacities for priority fish Post Open - National 40,000.00 23,150.53 Signed 2021-03-31 ication Selection 1 1 4 9 4 3 8 2 7 ploiement d'OPENARTFISH d eries management ans 5 régions côtières MG-MRHP-222316-CS-QCBS Component 2. Strengthenin / Recrutement d'une firme p Quality And Cost- Under Implemen 2021-04-2 2021-06-0 2021-07-0 2021-08-0 2021-09-0 2021-10-1 2022-04-1 IDA / 59870 g capacities for priority fish Prior Open - National 1,250,000.00 0.00 2021-03-31 our l'Appui au développeme Based Selection tation 1 4 4 3 7 2 0 eries management nt de l’économie bleue à Ma dagascar MG-MRHP-227234-CS-CQS / Recrutement d'une firme po Component 2. Strengthenin Consultant Qualif Under Implemen 2021-04-0 2021-04-2 2021-06-1 2021-07-1 2021-08-1 2022-02-1 ur la mise à jour de la straté IDA / 59870 g capacities for priority fish Post Open - National 30,000.00 0.00 2021-04-07 ication Selection tation 9 8 1 1 5 1 gie Nationale de la Bonne G eries management ouvernance de la Pêche Mar itime MG-MRHP-229422-CS-QCBS Component 2. Strengthenin Quality And Cost- Under Implemen 2021-05-1 2021-05-2 2021-10-1 2021-06-2 2022-03-0 2021-07-2 2022-04-1 2021-08-1 2022-05-3 2021-09-2 2022-07-2 2021-10-2 2023-01-2 / Recrutement des firmes po IDA / 59870 g capacities for priority fish Post Open - National 700,000.00 0.00 2021-05-14 Based Selection tation 8 9 4 8 2 8 1 8 0 2 0 7 0 ur l'élaboration des PAP régi eries management onaux Page 8 MG-MRHP-28730-CS-CQS// Component 2. Strengthenin Consultant Qualif Open - Internation 2021-07-2 2021-09-0 2021-10-0 2021-11-0 2022-05-0 MG-PM-157 / Étude pour l'ex IDA / 59870 g capacities for priority fish Post 50,000.00 0.00 Canceled 2021-07-01 ication Selection al 2 4 4 8 7 tension de l'ERS vers la flott eries management e nationale MG-MRHP-231603-CS-CQS / Recrutement d'une firme po Component 2. Strengthenin Consultant Qualif Under Implemen 2021-06-0 2021-06-0 2021-10-1 2021-07-1 2022-01-0 2021-08-1 2022-05-0 2021-09-2 2021-12-2 ur réaliser une étude diagno IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 2021-05-14 ication Selection tation 9 4 4 8 7 7 2 1 0 stique des besoins en renfor eries management cement des capacités DGPA et UGP SWIOFish2 MG-MRHP-231604-CS-LCS / Component 4. Project mana Least Cost Select 2021-06-1 2021-07-2 2021-08-2 2021-09-2 2021-10-2 2021-11-2 2022-01-2 Recrutement d'audit pour le IDA / Q9790 Post Open - National 32,500.00 0.00 Canceled 2021-05-20 gement and coordination ion 0 4 1 0 5 9 8 Centre de Surveillance de P êche MG-MRHP-232532-CS-LCS / Recrutement d'un cabinet d' Component 4. Project mana Least Cost Select 2021-07-1 2021-06-1 2021-07-2 2021-09-2 2021-08-2 2021-10-2 2021-09-2 2021-11-1 2021-10-2 2022-01-2 2021-11-2 2022-02-2 2023-09-2 IDA / 59870 Post Open - National 50,000.00 20,442.04 Signed 2021-05-20 audit externe des comptes d gement and coordination ion 5 0 4 3 1 5 0 2 5 6 9 4 9 u Projet 2021-2022 et 2023 MG-MRHP-236858-CS-CQS / Component 2. Strengthenin Recrutement d'un BE pour l Consultant Qualif Under Implemen 2021-08-0 2021-07-1 2021-10-1 2021-08-2 2021-11-2 2021-09-2 2022-05-3 2021-10-3 2022-04-2 TF / A4588 g capacities for priority fish Post Open - National 30,000.00 0.00 2021-06-30 es études technique et contr ication Selection tation 6 4 4 7 6 6 1 1 9 eries management ôle et surveillance du Burea u CSP à Toliara MG-MRHP-239019-CS-CQS / Recrutement d'un BE ET- PG Component 2. Strengthenin ES et C&S relative à la con Consultant Qualif Under Implemen 2021-08-0 2021-07-1 2021-10-1 2021-08-1 2021-09-1 2021-10-2 2022-06-0 IDA / 59870 g capacities for priority fish Post Open - National 37,000.00 0.00 2021-06-30 struction du bureau de la Cir ication Selection tation 6 4 4 7 6 1 8 eries management conscription en charge de la pêche et de l’Aquaculture à Besalampy. MG-MRHP-28755BIS-CS-QC BS // MG-PM-177 / Élaboratio Component 3. Strengthenin n des plans d'action aux rest g capacities for engaging in Quality And Cost- 2019-08-3 2020-01-2 2020-02-2 2020-04-0 2020-04-1 2021-02-0 2021-10-0 rictions de ressources (PARA IDA / 59870 Post Open - National 875,300.00 0.00 Canceled 2019-08-22 alternative fishing practices Based Selection 0 9 8 7 3 9 7 R) / Diagnostic des besoins and livelihoods activities en activités alternatives ada ptées à chaque région ultra prioritaire (AGR) MG-MRHP-150349-CS-CQS / Recrutement de consultant national pour assurer le renf Component 2. Strengthenin orcement de capacité des a Consultant Qualif Pending Implem 2022-01-1 2022-02-0 2022-03-2 2022-04-0 2022-04-2 IDA / 59870 g capacities for priority fish Post Open - National 1,500.00 0.00 2022-01-04 gents de l’administration de ication Selection entation 1 8 0 3 4 eries management s pêches et des responsable s des textes administratifs e n leadership et Gestion axés sur les résultats (2.1.1.1.04) MG-MRHP-14959-CS-CQS / Component 3. Strengthenin Mise en place d’une règleme g capacities for engaging in Consultant Qualif Open - Internation 2021-11-1 2022-01-2 2022-03-1 2022-05-1 2022-11-0 IDA / 59870 Post 60,000.00 0.00 Canceled 2021-09-30 ntation de base concernant l alternative fishing practices ication Selection al 4 8 4 3 9 a sécurité en mer de la petit and livelihoods activities e pêche MG-MRHP-263393-CS-CQS / Recrutement des BE pour ré Component 3. Strengthenin aliser les études techniques, g capacities for engaging in Consultant Qualif 2021-12-1 2021-12-1 2021-12-2 2022-01-2 2022-03-1 2022-02-2 2022-06-0 2022-04-0 2022-07-2 2022-09-2 IDA / 59870 Post Open - National 77,000.00 98,415.82 Signed 2021-11-23 PGES et contrôle et surveilla alternative fishing practices ication Selection 5 4 1 7 7 6 9 2 0 9 nce des travaux de construc and livelihoods activities tion des petites infrastructur es de pêches (relance lot 1 et 5) MG-MRHP-264080-CS-CQS / Recrutement des BE pour é Component 3. Strengthenin tudes techniques, PGES et C g capacities for engaging in Consultant Qualif 2021-12-1 2021-12-2 2021-12-2 2022-01-2 2022-03-1 2022-02-2 2022-06-0 2022-03-3 2022-07-2 2022-10-1 IDA / 59870 Post Open - National 84,000.00 111,436.73 Signed 2021-11-30 ontrôle et surveillance des tr alternative fishing practices ication Selection 5 1 1 4 7 3 9 0 0 6 avaux de construction des b and livelihoods activities âtiments abritant les chamb res froide repartis en 3 lots MG-MRHP-288108-CS-CQS / Component 2. Strengthenin Mise à jour l’enquête cadre Consultant Qualif Under Implemen 2022-04-1 2022-05-0 2022-05-0 2022-06-1 2022-08-0 2022-07-1 2022-11-1 2022-08-1 2023-02-1 IDA / 59870 g capacities for priority fish Post Open - National 100,000.00 0.00 2022-04-11 nationale 2012-2013 sur la ication Selection tation 8 2 3 5 5 5 8 9 5 eries management petite pêche maritime et la pêche continentale MG-MRHP-232529-CS-QCBS Component 2. Strengthenin / Recrutement d'une firme p Quality And Cost- Open - Internation 2022-01-2 2021-06-1 2021-07-2 2021-08-2 2021-09-2 2021-10-2 2021-11-2 2022-11-2 IDA / 59870 g capacities for priority fish Prior 2,000,000.00 0.00 Canceled 2021-05-20 our le développement de la Based Selection al 3 0 4 1 0 5 9 9 eries management planification spatiale mariti me PSM à Madagascar MG-MRHP-232529 BIS-CS-Q CBS / Recrutement d'une fir Component 2. Strengthenin Quality And Cost- Open - Internation Under Implemen 2022-04-2 2022-05-1 2022-04-2 2022-06-2 2022-07-2 2022-08-2 2022-09-2 2022-10-3 2023-10-3 me pour le développement IDA / 59870 g capacities for priority fish Post 600,000.00 0.00 2022-04-20 Based Selection al tation 5 1 8 4 2 1 5 0 0 de la planification spatiale eries management maritime PSM à Madagascar MG-MRHP-239018-CS-CQS / Recrutement d’une firme po Component 2. Strengthenin ur élaborer et mettre à jour l Consultant Qualif 2021-10-1 2021-10-0 2021-12-2 2021-11-1 2021-12-1 2021-12-2 2022-05-0 IDA / 59870 g capacities for priority fish Post Open - National 56,000.00 0.00 Canceled 2021-09-22 es textes d’application de la ication Selection 9 6 1 0 0 4 3 eries management nouvelle loi portant Code de la Pêche et de l'Aquaculture à Madagascar MG-MRHP-28757-CS-QCBS// Component 3. Strengthenin MG-PM-179 / Étude de faisa g capacities for engaging in Quality And Cost- Open - Internation 2021-10-3 2022-01-1 2022-02-2 2022-04-1 2022-06-1 2022-08-1 2023-08-1 bilité technique des constru IDA / 59870 Post 795,000.00 0.00 Canceled 2021-10-01 alternative fishing practices Based Selection al 1 4 8 4 3 2 2 ctions d'infrastructures de p and livelihoods activities êche(APS & APD) (33 débarc adères, 8 marchés couverts) MG-MRHP-252969-CS-CQS / Component 3. Strengthenin Recrutement d'une firme po g capacities for engaging in Consultant Qualif 2021-10-1 2021-11-1 2021-12-1 2022-01-0 2022-12-2 IDA / 59870 Post Open - National 100,000.00 0.00 Canceled 2021-09-30 ur la promotion de transfert alternative fishing practices ication Selection 4 8 8 1 7 financier pour les 03 ZUP. and livelihoods activities MG-MRHP-218708-CS-QCBS Component 3. Strengthenin / Recrutement d’une firme g capacities for engaging in Quality And Cost- Pending Implem 2022-05-1 2022-06-1 2022-07-1 2022-08-0 2022-09-1 2022-10-1 2023-02-1 en charge de l’élaboration d’ IDA / 59870 Post Open - National 100,000.00 0.00 2022-05-10 alternative fishing practices Based Selection entation 5 9 9 9 3 8 5 un plan de formation/renforc and livelihoods activities ement de capacités des élus et des acteurs MG-MRHP-198566-CS-QCBS / Recrutement des BE pour é Component 3. Strengthenin tudes techniques- PGES et c g capacities for engaging in Quality And Cost- 2020-11-1 2020-12-2 2021-01-2 2021-02-2 2021-04-0 2021-05-0 2021-12-0 IDA / 59870 Post Open - National 240,000.00 0.00 Canceled 2020-10-23 ontrôle et surveillance des tr alternative fishing practices Based Selection 3 7 6 5 1 6 2 avaux des petites infrastruct and livelihoods activities ures de pêches pour les 3 Z ups répartis en 8 Lots. MG-MRHP-239018-CS-CQS- 2 / Recrutement d'une firme Component 2. Strengthenin pour élaborer et mettre à jo Consultant Qualif Under Implemen 2022-05-1 2022-05-0 2022-05-1 2022-06-0 2022-07-0 2022-07-2 2022-11-2 IDA / 59870 g capacities for priority fish Post Open - National 56,000.00 0.00 2022-04-18 ur les textes d'application d ication Selection tation 0 2 6 6 6 0 7 eries management e la nouvelle loi portant Cod e de la Pêche et de l'Aquacu lture à Madagascar. MG-MRHP-14951-CS-QCBS / PA 65: Etudes techniques : - Clôture de l'enceinte DRRHP Component 2. Strengthenin Fénérive - Construction des Quality And Cost- 2019-08-1 2019-09-2 2019-10-2 2019-11-2 2019-12-3 2020-02-0 2021-02-0 IDA / Q9790 g capacities for priority fish Post Open - National 35,000.00 0.00 Canceled 2019-07-26 Bureaux de 06 DRRHP - Exte Based Selection 6 9 7 6 1 4 3 eries management nsion de l'ASH à Antsiranana et Morondava - Construction local pour bureau UGP et 0 8 CirRHP (APS/APD) MG-MRHP-285789-CS-CQS / Recrutement d'une firme po Component 2. Strengthenin Consultant Qualif 2022-04-1 2022-06-0 2022-07-0 2022-08-0 2023-02-0 ur mettre à jour l’enquête c IDA / 59870 g capacities for priority fish Post Open - National 100,000.00 0.00 Canceled 2022-03-28 ication Selection 8 1 1 5 1 adre nationale 2012-2013 s eries management ur la petite pêche maritime et la pêche continentale MG-MRHP-150366-CS-CQS / RECRUTEMENT D'UN CONSU Component 2. Strengthenin LTANT NATIONAL POUR LA F Consultant Qualif 2021-07-3 2021-08-2 2021-10-0 2021-10-2 2021-12-1 IDA / 59870 g capacities for priority fish Post Open - National 15,000.00 0.00 Canceled 2021-07-23 ORMATION ET RENFORCEME ication Selection 0 7 6 0 9 eries management NT DE CAPACITE DE L’EQUIP E EN COMMUNICATION (2.1. 4.1.05) MG-MRHP-150361-CS-CQS / RECRUTEMENT D'UN CONSU LTANT NATIONAL POUR LE R Component 2. Strengthenin ENFORCEMENT DE CAPACIT Consultant Qualif Pending Implem 2022-11-0 2022-12-0 2023-01-1 2023-01-2 2023-03-3 IDA / 59870 g capacities for priority fish Post Open - National 8,000.00 0.00 2022-11-01 E DU PERSONNEL DE L’AUT ication Selection entation 8 6 5 9 0 eries management ORITE SANITAIRE HALIEUTIQ UE EN INFORMATIQUE (BUR EAUTIQUE ET PROGRAMMAT ION) AU NIVEAU NATIONAL ( 2.1.7.2.02) MG-MRHP-298214-CS-CQS / Recrutement d’une firme ch Component 3. Strengthenin argée de l’appui à la promot g capacities for engaging in Consultant Qualif Under Implemen 2022-06-1 2022-07-1 2022-08-1 2022-09-1 2022-10-0 2023-09-2 IDA / 59870 Post Open - National 70,000.00 0.00 2022-06-30 ion des produits halieutique alternative fishing practices ication Selection tation 5 4 8 7 1 6 s valorisés au niveau des ZU and livelihoods activities P sur le marché national/inte rnational MG-MRHP-304395-CS-CQS / Recrutement d’une firme po Component 3. Strengthenin ur l’étude de faisabilité de m g capacities for engaging in Consultant Qualif Under Implemen 2022-07-2 2022-08-1 2022-10-0 2022-11-0 2022-12-0 2023-03-0 IDA / 59870 Post Open - National 60,000.00 0.00 2022-07-29 ise en place d’unités de pro alternative fishing practices ication Selection tation 2 9 2 1 6 6 duction artisanale de conser and livelihoods activities ves de sardines à BATAN et BA MG-MRHP-304402-CS-QCBS Component 2. Strengthenin / Recrutement d'une firme p Quality And Cost- Open - Internation Under Implemen 2022-08-0 2022-08-1 2022-08-2 2022-10-0 2022-10-3 2022-11-2 2023-01-0 2023-02-0 2023-08-0 IDA / 59870 g capacities for priority fish Post 205,000.00 0.00 2022-07-29 our la lise en place des outil Based Selection al tation 3 9 2 2 0 9 3 7 6 eries management s d'aménagement des pêch eries à Madagascar MG-MRHP-307091-CS-CQS / Component 2. Strengthenin Evaluation des emplois direc Consultant Qualif Under Implemen 2022-09-1 2022-09-0 2022-10-0 2022-10-1 2022-11-1 2022-12-2 2023-06-1 IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 2022-08-12 ts et indirects issus de la pet ication Selection tation 5 2 7 6 5 0 8 eries management ite pêche au niveau des 03 ZUP du Projet MG-MRHP-307110-CS-CQS / Elaboration de Cartographie Component 2. Strengthenin Consultant Qualif Under Implemen 2022-09-1 2022-09-0 2022-10-3 2022-10-1 2022-11-1 2022-12-2 2023-06-1 détaillée pour le développe IDA / 59870 g capacities for priority fish Post Open - National 150,000.00 0.00 2022-08-12 ication Selection tation 5 2 1 6 5 0 8 ment de l’holothuriculture, l eries management a crabiculture, l’algoculture et l’aquaculture continental e. MG-MRHP-307200-CS-CQS / Recrutement d’une firme po Component 2. Strengthenin Consultant Qualif Under Implemen 2022-09-1 2022-08-3 2022-10-2 2022-10-0 2022-11-0 2022-12-0 2023-06-1 ur la mise en place d’un site IDA / 59870 g capacities for priority fish Post Open - National 20,000.00 0.00 2022-08-09 ication Selection tation 5 0 7 4 3 8 6 web dynamique du Ministèr eries management e de la Pêche et de l’Écono mie Bleue MG-MRHP-306851-CS-CQS / Etude technique, l'élaboratio Component 2. Strengthenin Consultant Qualif Under Implemen 2022-11-2 2022-10-2 2022-12-1 2022-12-0 2023-01-0 2023-02-0 2023-08-0 n du PGES , contrôle et surv IDA / 59870 g capacities for priority fish Post Open - National 60,000.00 0.00 2022-09-29 ication Selection tation 4 0 5 3 2 6 5 eillance des travaux de cons eries management truction de l'antenne CDPH M à Besalampy MG-MRHP-306857-CS-CQS / Component 3. Strengthenin Etude techniques élaboratio g capacities for engaging in Consultant Qualif Under Implemen 2022-11-2 2022-10-1 2022-12-1 2022-12-0 2023-01-0 2023-02-0 2023-08-0 n PGES et Contrôle & surveil IDA / 59870 Post Open - National 35,000.00 0.00 2022-09-28 alternative fishing practices ication Selection tation 4 9 6 2 1 5 4 lance de la Construction déb and livelihoods activities arcadère à Ankazomborona MG-MRHP-320120-CS-CQS / Component 3. Strengthenin Recrutement d'une associati g capacities for engaging in Consultant Qualif Under Implemen 2022-10-2 2022-10-2 2022-10-3 2022-11-1 2022-12-0 2022-12-1 2023-09-2 on pour l’étude et la mise en IDA / 59870 Post Open - National 40,000.00 0.00 2022-10-21 alternative fishing practices ication Selection tation 7 2 1 9 3 7 9 place d’habitats artificiels d and livelihoods activities ans quatre zones côtières Page 9 MG-MRHP-320122-CS-CQS / Recrutement d'une firme po Component 2. Strengthenin Consultant Qualif Under Implemen 2022-10-2 2022-11-0 2022-12-0 2022-12-0 2023-01-0 2023-01-2 2023-05-2 ur l'élaboration de la Politiqu IDA / 59870 g capacities for priority fish Post Open - National 75,000.00 0.00 2022-10-21 ication Selection tation 5 4 6 9 8 9 9 e Nationale intégrée de la G eries management ouvernance de l'Océan à Ma dagascar MG-MRHP-355022-CS-CQS / Component 3. Strengthenin Recrutement d’une ONG po g capacities for engaging in Consultant Qualif Under Implemen 2023-05-0 2023-04-2 2023-05-2 2023-05-1 2023-05-2 2023-05-3 2023-08-2 IDA / 59870 Post Open - National 250,000.00 0.00 2023-04-09 ur la mise en œuvre des Acti alternative fishing practices ication Selection tation 9 4 3 9 4 1 9 vités Alternatives (PARAR/A and livelihoods activities GR) MG-MRHP-239021-CS-CQS / Component 4. Project mana Consultant Qualif Under Implemen 2023-05-2 2023-05-2 2023-05-2 2023-06-0 2023-07-0 2023-07-2 2023-09-2 Recrutement firme pour l'év IDA / 59870 Post Open - National 75,000.00 0.00 2023-05-10 gement and coordination ication Selection tation 3 4 5 7 7 1 9 aluation finale du projet SWI OFish2 MG-MRHP-239020-CS-CQS / Component 2. Strengthenin Recrutement d'une firme po Consultant Qualif Under Implemen 2023-05-0 2023-05-2 2023-05-2 2023-06-2 2023-07-1 2023-07-2 2023-09-2 IDA / 59870 g capacities for priority fish Post Open - National 25,000.00 0.00 2023-05-10 ur l'élaboration de manuel d ication Selection tation 9 4 2 8 2 6 4 eries management e l'audit interne du MPEB MG-MRHP-362176-CS-CQS / Renforcement de capacité d Component 3. Strengthenin u comité de gestion des infr g capacities for engaging in Consultant Qualif Under Implemen 2023-06-1 2023-07-2 2023-08-0 2023-08-1 2023-09-1 IDA / 59870 Post Open - National 270,000.00 0.00 2023-05-26 astructures sur la gestion de alternative fishing practices ication Selection tation 6 1 5 5 4 s infrastructures et appui à l' and livelihoods activities opérationnalisation des petit es infrastructures; Component 3. Strengthenin MG-MRHP-363621-CS-CQS / g capacities for engaging in Consultant Qualif Under Implemen 2023-06-0 2023-06-1 2023-06-1 2023-06-2 2023-07-1 2023-07-2 2023-09-1 Formation sur la fabrication IDA / 59870 Post Open - National 30,000.00 0.00 2023-05-30 alternative fishing practices ication Selection tation 6 4 4 4 4 1 9 des pirogues and livelihoods activities MG-MRHP-4770-CS-CQS / C onception d'un système de c Component 2. Strengthenin Consultant Qualif Open - Internation 2017-02-2 2017-04-0 2017-05-0 2017-06-1 2017-12-0 ollecte de données pour les IDA / Q9790 g capacities for priority fish Post 10,000.00 0.00 Canceled 2017-02-01 ication Selection al 2 7 7 1 8 pêcheries traditionnelles, y eries management compris une stratégie d'éch antillonnage appropriée MG-MRHP-4769-CS-CQS / Mi Component 2. Strengthenin se à jour de la Stratégie d'a Consultant Qualif Open - Internation 2017-02-2 2017-04-0 2017-05-0 2017-06-1 2017-12-0 IDA / Q9790 g capacities for priority fish Post 75,000.00 0.00 Canceled 2017-02-01 quaculture et élaboration de ication Selection al 2 7 7 1 8 eries management plan de développement des 03 filières aquaculture INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Identifie Loan / Credit Market Approa Contract Type Estimated Am Actual Amou Process Statu Draft Negotiated Co Description Component Review Type Method Terms of Reference d/Selected Consulta Signed Contract Contract Completion No. ch ount (US$) nt (US$) s ntract nt Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-MRHP-23395-CS-INDV// PA75 / Recrutement d'un (0 Component 4. Project mana Individual Consul 2017-08-0 2017-09-2 2017-09-2 2017-10-1 2017-10-0 2017-11-2 2017-10-0 2018-05-2 2019-04-0 1) Spécialiste en Passation d IDA / Q9790 Post Open 15,600.00 15,412.69 Completed 2017-08-02 gement and coordination tant Selection 3 0 1 1 2 2 3 1 1 es Marchés en appui à l'équi pe de passation des marché s de l'UGP SWIOFish2. MG-MRHP-28176-CS-INDV// MG-PM-24 / Diagnostic des t echniques de valorisation pr Component 3. Strengthenin atiquées à Madagascar et le g capacities for engaging in Individual Consul 2018-02-1 2018-03-1 2018-04-1 2018-10-0 IDA / 59870 Post Open 30,000.00 0.00 Canceled 2017-11-30 s bonnes pratique en Afriqu alternative fishing practices tant Selection 8 8 0 7 e et identifier les besoins en and livelihoods activities technique de valorisation de s produits halieutiques de ch aque région ultra prioritaire MG-MRHP-28321-CS-INDV// Component 3. Strengthenin MG-PM-26 / Évaluation du ni g capacities for engaging in Individual Consul 2018-01-1 2018-01-3 2018-03-1 2018-09-1 IDA / D1720 Post Open 90,000.00 0.00 Canceled 2017-10-30 veau de vulnérabilité des m alternative fishing practices tant Selection 0 1 4 0 énages bénéficiaires and livelihoods activities MG-MRHP-28328-CS-INDV// Component 3. Strengthenin MG-PM-30 / Élaboration du p g capacities for engaging in Individual Consul 2018-01-2 2018-02-1 2018-03-2 2018-09-2 IDA / 59870 Post Open 10,500.00 0.00 Canceled 2017-10-30 lan stratégique de développ alternative fishing practices tant Selection 5 5 9 5 ement local (PCD et PLD) and livelihoods activities MG-MRHP-28338-CS-INDV// Component 4. Project mana Individual Consul 2017-12-2 2018-01-1 2018-02-2 2018-08-2 MG-PM-35 / Assistants coord IDA / 59870 Post Open 20,800.00 0.00 Canceled 2017-10-16 gement and coordination tant Selection 0 0 1 0 inateurs locaux UGL MG-MRHP-28344-CS-INDV// MG-PM-41 / Élaboration d'un Component 4. Project mana Individual Consul 2018-02-2 2018-03-1 2018-04-2 2018-10-2 IDA / 59870 Post Open 10,000.00 0.00 Canceled 2017-12-15 e stratégie du plan de comm gement and coordination tant Selection 5 8 9 6 unication du projet SWIOFis h2 MG-MRHP-28345-CS-INDV// Component 4. Project mana Individual Consul 2018-01-2 2018-02-1 2018-03-3 2018-09-2 MG-PM-42 / Mise en place d IDA / 59870 Post Open 2,000.00 0.00 Canceled 2017-11-15 gement and coordination tant Selection 6 6 0 6 u site internet du projet SWI OFish2 MG-MRHP-28346-CS-INDV// Component 4. Project mana Individual Consul 2018-02-1 2018-03-1 2018-04-2 2018-10-1 MG-PM-43 / Mission de couv IDA / 59870 Post Open 1,000.00 0.00 Canceled 2017-12-15 gement and coordination tant Selection 8 1 2 9 erture des autres activités d e communication MG-MRHP-27289-CS-INDV// Component 2. Strengthenin PA27 / Évaluation et dévelop Individual Consul 2015-09-0 2017-10-2 2017-11-1 2016-11-0 2017-12-2 2017-11-1 2018-06-1 2018-08-3 IDA / Q9790 g capacities for priority fish Post Open 50,000.00 35,963.63 Completed 2017-09-07 pement de la recherche hali tant Selection 9 6 6 1 1 4 9 0 eries management eutique (pour les 5 filières p rioritaires MG-MRHP-28651-CS-INDV// Component 2. Strengthenin Individual Consul 2018-09-0 2018-09-2 2018-11-0 2019-05-0 MG-PM-111 / Assistance Tec IDA / 59870 g capacities for priority fish Post Open 10,000.00 0.00 Canceled 2018-07-02 tant Selection 5 6 7 6 hnique juridique pour le SLC eries management MG-MRHP-28653-CS-INDV// MG-PM-112 / Étude et analy Component 2. Strengthenin se diagnostiques des stratég Individual Consul 2018-04-0 2018-04-2 2018-06-0 2018-12-0 IDA / 59870 g capacities for priority fish Post Open 30,000.00 0.00 Canceled 2018-01-30 ies du secteur et des ancien tant Selection 5 6 7 4 eries management s plans directeurs et élabora tion du nouveau plan directe ur MG-MRHP-28692-CS-INDV// Component 2. Strengthenin MG-PM-136 / Développemen Individual Consul 2018-05-0 2018-05-2 2018-06-3 2018-12-2 IDA / 59870 g capacities for priority fish Post Open 30,000.00 0.00 Canceled 2018-03-01 t des points de référence op tant Selection 5 6 0 7 eries management érationnels pour la gestion d e la pêche crevettière MG-MRHP-28704-CS-INDV// Component 2. Strengthenin Individual Consul 2018-08-0 2018-08-2 2018-09-3 2019-03-2 MG-PM-148 / Audit techniqu IDA / 59870 g capacities for priority fish Post Open 30,000.00 0.00 Canceled 2018-06-01 tant Selection 5 6 0 9 e et financier de la pêche au eries management x thons MG-MRHP-28744-CS-INDV// Component 3. Strengthenin MG-PM-169 / Prestataire for g capacities for engaging in Individual Consul 2019-01-0 2019-01-2 2019-03-0 2019-08-2 IDA / 59870 Post Open 30,000.00 0.00 Canceled 2018-11-01 mateur en construction et e alternative fishing practices tant Selection 5 6 2 9 ntretien des embarcations and livelihoods activities MG-MRHP-28751-CS-INDV// Component 3. Strengthenin MG-PM-174 / Prestataire for g capacities for engaging in Individual Consul 2018-08-1 2018-09-0 2018-10-1 2019-04-1 IDA / 59870 Post Open 75,000.00 0.00 Canceled 2018-06-15 mateur en technique de val alternative fishing practices tant Selection 9 9 4 2 orisation and livelihoods activities MG-MRHP-28752-CS-INDV// Component 3. Strengthenin MG-PM-175 / Prestataire for g capacities for engaging in Individual Consul 2018-09-1 2018-10-0 2018-11-1 2019-05-1 IDA / 59870 Post Open 25,000.00 0.00 Canceled 2018-06-29 mateur en technique comm alternative fishing practices tant Selection 7 8 2 1 erciale and livelihoods activities MG-MRHP-28758-CS-INDV// MG-PM-181 / Étude d'impact Component 3. Strengthenin environnemental et social d g capacities for engaging in Individual Consul 2018-07-1 2018-08-0 2018-09-1 2019-03-1 IDA / 59870 Post Open 90,000.00 0.00 Canceled 2018-05-30 es constructions d'infrastruc alternative fishing practices tant Selection 8 8 2 1 tures de pêche(APS & APD) ( and livelihoods activities 33 débarcadères, 8 marchés couverts) MG-MRHP-28762-CS-INDV// Component 3. Strengthenin MG-PM-184 / Gestion et mis g capacities for engaging in Individual Consul 2018-07-1 2018-08-0 2018-09-1 2019-03-1 IDA / V0500 Post Open 15,000.00 0.00 Canceled 2018-05-30 e en œuvre : évaluation de l alternative fishing practices tant Selection 8 8 2 1 a mise en place de l'électrifi and livelihoods activities cation hors grille MG-MRHP-28765-CS-INDV// Component 4. Project mana Individual Consul 2018-11-1 2018-12-1 2019-01-1 2019-07-1 MG-PM-188 / Responsable P IDA / 59870 Post Open 7,800.00 0.00 Canceled 2018-10-01 gement and coordination tant Selection 9 0 4 3 assation de marché MG-MRHP-28769-CS-INDV// MG-PM-191 / Mission de cou Component 4. Project mana Individual Consul 2018-04-1 2018-05-1 2018-06-1 2018-12-1 IDA / 59870 Post Open 1,000.00 0.00 Canceled 2018-03-01 verture des autres activités gement and coordination tant Selection 9 0 4 1 de communication MG-MRHP-28770-CS-INDV// Component 4. Project mana Individual Consul 2018-04-1 2018-05-0 2018-06-1 2018-12-1 MG-PM-192 / Réalisation du IDA / 59870 Post Open 8,000.00 0.00 Canceled 2018-02-28 gement and coordination tant Selection 8 9 3 0 Bulletin trimestriel SWIOFish 2 MG-MRHP-14956-CS-INDV// 70 / PA 70: Etude sur l'adapt Component 2. Strengthenin Individual Consul 2018-02-1 2018-02-2 2018-04-0 2018-10-0 ation des missions et attribu IDA / Q9790 g capacities for priority fish Post Open 15,000.00 0.00 Canceled 2017-11-30 tant Selection 0 4 7 4 tions du MRHP par rapport a eries management ux défis du développement r ural MG-MRHP-14959-CS-INDV// Component 3. Strengthenin PA71 / PA 71: Mise en place g capacities for engaging in Individual Consul 2018-07-2 2018-08-0 2018-09-2 2019-03-1 IDA / Q9790 Post Open 1,000.00 0.00 Canceled 2018-05-31 d'une règlementation de bas alternative fishing practices tant Selection 6 9 0 9 e concernant la sécurité en and livelihoods activities mer de la petite pêche MG-MRHP-14955-CS-INDV// Component 2. Strengthenin 69 / PA 69: Elaboration du S Individual Consul 2018-06-2 2018-07-1 2018-08-1 2019-02-1 IDA / Q9790 g capacities for priority fish Post Open 8,000.00 0.00 Canceled 2018-05-15 chéma d'aménagement aqu tant Selection 6 0 4 0 eries management acole national (algues, crab es, holothurie etc) MG-MRHP-14954-CS-INDV// PA68 / PA 68: Conception d' Component 2. Strengthenin Individual Consul 2018-02-0 2018-02-1 2018-03-2 2018-09-2 un système de collecte de d IDA / Q9790 g capacities for priority fish Post Open 10,000.00 0.00 Canceled 2017-12-30 tant Selection 3 7 4 0 onnées pour les pêcheries tr eries management aditionnelles, y compris une stratégie MG-MRHP-14497-CS-INDV// PA-42 / PA 42: Etude sur les Component 2. Strengthenin Individual Consul 2017-07-0 2017-07-1 2017-08-1 2018-02-1 FFOM et mesures nécessaire IDA / Q9790 g capacities for priority fish Post Open 25,000.00 0.00 Canceled 2017-05-29 tant Selection 3 0 4 0 s pour le développement de eries management la pêche nationale et attirer la flotte étrangère MG-MRHP-14950-CS-INDV// PA64 / PA 64: Etude sur les Component 2. Strengthenin besoins en formation, en Eq Individual Consul 2017-07-0 2017-07-1 2017-08-0 2018-02-0 IDA / Q9790 g capacities for priority fish Prior Open 20,000.00 0.00 Canceled 2017-05-29 uipements et immobiliers de tant Selection 3 0 7 3 eries management l'Administration (Central et DRRHP) Plans de formation et d'investissement MG-MRHP-14948-CS-INDV// Component 2. Strengthenin PA21 / PA 21: Etude de faisa Individual Consul 2018-06-2 2018-07-0 2018-07-3 2019-01-2 IDA / Q9790 g capacities for priority fish Post Open 20,000.00 0.00 Canceled 2018-05-15 bilité du projet d'Ecole Natio tant Selection 6 3 1 7 eries management nale Halieutique, les besoins en formation Page 10 MG-MRHP-28167-CS-QCBS// MG-PM-15 / Développement Component 2. Strengthenin et mise en œuvre du systèm Individual Consul 2018-03-1 2018-04-0 2018-05-1 2018-11-1 IDA / D1720 g capacities for priority fish Post Open 5,000.00 0.00 Canceled 2017-12-15 e de collecte de données po tant Selection 2 2 4 0 eries management ur les pêcheries traditionnell es, y compris une stratégie d'échantillonnage approprié e MG-MRHP-28339-CS-CQS// Component 4. Project mana Individual Consul 2017-08-2 2017-12-0 2018-01-2 2017-12-2 2018-01-2 2018-02-0 2018-02-1 2018-07-3 MG-PM-37 / Recrutement d'u IDA / 59870 Post Open 4,000.00 23,250.53 Signed 2017-10-19 gement and coordination tant Selection 4 7 3 8 3 1 7 1 n Chef Comptable MG-MRHP-28711-CS-QCBS// MG-PM-153 / Étude de prosp Component 2. Strengthenin Individual Consul 2018-12-0 2018-12-2 2019-02-0 2019-08-0 ection des lieux d'implantati IDA / 59870 g capacities for priority fish Post Open 1,500.00 0.00 Canceled 2018-10-01 tant Selection 5 6 6 5 on des deux antennes regio eries management nales de l'USTA (Majunga, T amatave) MG-MRHP-28712-CS-QCBS// Component 2. Strengthenin Individual Consul 2019-02-1 2019-03-0 2019-04-1 2019-10-0 MG-PM-154 / Étude de mise IDA / 59870 g capacities for priority fish Post Open 1,500.00 0.00 Canceled 2018-12-03 tant Selection 3 6 0 7 en place des antennes régio eries management nales MG-MRHP-33990-CS-INDV// Component 2. Strengthenin Individual Consul 2018-01-2 2018-02-1 2018-03-2 2018-09-2 MG-PM 68 / Assistance tech IDA / D1720 g capacities for priority fish Post Open 26,000.00 0.00 Canceled 2017-11-02 tant Selection 1 1 5 1 nique pour le suivi des trava eries management ux de carénage MG-MRHP-86203-CS-INDV// Component 2. Strengthenin Individual Consul 2019-01-3 2019-03-0 2019-04-2 2019-07-0 2020-01-0 PA13 / Mise à jour de la Stra IDA / 59870 g capacities for priority fish Post Open 30,000.00 0.00 Canceled 2018-11-22 tant Selection 1 7 1 5 1 tégie Nationale de l'Aquacul eries management ture MG-MRHP-86204-CS-INDV / Component 2. Strengthenin Recrutement d'un consultan Individual Consul 2018-12-1 2019-03-1 2019-02-2 2019-04-1 2019-02-2 2019-06-2 2018-12-2 2019-12-2 2020-04-0 IDA / D1720 g capacities for priority fish Post Open 55,000.00 39,810.58 Completed 2018-11-26 t pour convertir OPENARTFIS tant Selection 7 1 6 0 6 4 6 1 2 eries management H dans une base de donnée s basée sur le We MG-MRHP-86205-CS-INDV// Component 2. Strengthenin MG-PM 51/18 / Assistance te Individual Consul 2018-08-1 2019-03-0 2018-10-2 2019-04-0 2018-11-0 2019-06-2 2018-11-1 2019-12-1 IDA / D1720 g capacities for priority fish Post Open 26,000.00 24,252.91 Signed 2018-11-22 chnique pour le suivi des tra tant Selection 0 7 3 6 8 0 3 7 eries management vaux de carénage de l'Atsan tsa MG-MRHP-105669-CS-INDV Component 3. Strengthenin / Recrutement d'agence de g capacities for engaging in Individual Consul 2019-03-2 2019-04-2 2019-04-3 2019-05-2 2019-11-2 communication pour la conc IDA / 59870 Post Open 5,625.00 0.00 Canceled 2019-03-12 alternative fishing practices tant Selection 0 3 0 8 4 eption et production des sup and livelihoods activities ports de communications rel atifs au MDGP MG-MRHP-119243-CS-INDV / Assistance technique pour Component 2. Strengthenin Individual Consul 2019-08-0 2019-11-2 2020-01-1 2020-03-2 2020-09-2 la coordination génerale des IDA / 59870 g capacities for priority fish Post Open 15,000.00 0.00 Canceled 2019-08-15 tant Selection 9 8 2 7 3 activités durant l'élaboration eries management du PAP Atsimo Atsinanana MG-MRHP-119244-CS-INDV / Etude sur l'analyse de prob Component 2. Strengthenin Individual Consul 2019-08-0 2020-01-2 2020-01-1 2020-03-1 2020-02-2 2020-05-1 2020-03-0 2020-11-0 lématiques liées à la pratiqu IDA / D1720 g capacities for priority fish Post Open 20,000.00 10,846.29 Signed 2019-10-15 tant Selection 2 8 7 3 1 2 9 8 e courante des sennes de pl eries management age dans la Baie d’ Antongil MG-MRHP-119261-CS-INDV Component 3. Strengthenin / Prestataire formateur en c g capacities for engaging in Individual Consul 2019-12-2 2020-01-2 2020-03-2 2020-09-2 IDA / 59870 Post Open 30,000.00 0.00 Canceled 2019-09-15 onstruction et entretien des alternative fishing practices tant Selection 9 8 8 4 engins de pêche and livelihoods activities Component 3. Strengthenin MG-MRHP-119286-CS-INDV g capacities for engaging in Individual Consul 2019-12-1 2020-01-1 2020-03-2 2020-09-2 / Consultance et appui à la c IDA / 59870 Post Open 45,900.00 0.00 Canceled 2019-08-30 alternative fishing practices tant Selection 3 2 7 3 omposante 3 and livelihoods activities MG-MRHP-119288-CS-INDV Component 4. Project mana Individual Consul 2019-08-2 2019-10-2 2019-10-2 2019-11-2 2019-11-1 2020-01-1 2019-11-2 2020-07-1 / Consultance et appui à la IDA / 59870 Post Open 15,300.00 11,155.20 Terminated 2019-07-31 gement and coordination tant Selection 8 9 2 8 2 8 6 6 composante 4 MG-MRHP-119289-CS-CDS / Component 4. Project mana 2019-07-2 2019-08-1 2019-08-0 2019-11-1 2019-08-1 2020-05-1 IDA / 59870 Post Direct Selection Direct 20,400.00 32,788.66 Signed 2019-07-15 Responsable Administratif et gement and coordination 9 9 8 7 6 5 Financier MG-MRHP-119291-CS-INDV Component 4. Project mana Individual Consul Under Implemen 2019-10-1 2019-10-2 2019-11-2 2020-01-1 2020-07-1 IDA / 59870 Post Open 4,200.00 0.00 2019-07-31 / Personnel d'appui : Secréta gement and coordination tant Selection tation 0 9 8 8 6 ire MG-MRHP-28341-CS-CQS// Component 4. Project mana Individual Consul 2017-08-2 2019-09-0 2018-01-2 2019-09-2 2018-01-2 2019-10-2 2018-03-0 2020-04-2 MG-PM-38 / Recrutement de IDA / 59870 Post Open 24,000.00 47,399.30 Signed 2019-07-15 gement and coordination tant Selection 4 2 2 3 3 8 6 5 deux (02) Comptables MG-MRHP-119292-CS-INDV Component 4. Project mana Individual Consul Pending Implem 2019-07-2 2019-08-1 2019-09-1 2020-03-1 / Personnel d'appui (Femme IDA / 59870 Post Limited 1,320.00 0.00 2019-07-15 gement and coordination tant Selection entation 0 0 4 2 de ménage et gardien) MG-MRHP-119293-CS-INDV Component 4. Project mana Individual Consul Pending Implem 2019-07-2 2019-08-1 2019-09-1 2020-03-1 IDA / 59870 Post Limited 25,200.00 0.00 2019-07-15 / Personnel d'appui : Chauffe gement and coordination tant Selection entation 0 0 4 2 ur MG-MRHP-28673-CS-INDV// Component 2. Strengthenin MG-PM-124 / Amélioration d Individual Consul 2019-09-0 2019-09-2 2019-10-3 2020-04-2 IDA / D1720 g capacities for priority fish Post Open 15,000.00 0.00 Canceled 2019-07-01 e la base de données pour l tant Selection 4 5 0 7 eries management es pêcheries industrielles MG-MRHP-23395-CS-INDV// SPM / Frais de personnel du projet : recrutement d'un (0 Component 4. Project mana Individual Consul 2019-08-0 2019-09-1 2019-10-0 2019-10-0 2019-10-1 2019-11-0 2019-10-2 2020-05-0 IDA / 59870 Post Open 88,400.00 14,322.53 Signed 2019-07-26 1) Spécialiste en Passation d gement and coordination tant Selection 1 3 4 4 5 8 1 6 es Marchés en appui à l'équi pe de passation des marché s de l'UGP SWIOFish2. MG-MRHP-119243BIS-CS-IN DV / Recrutement d’un cons ultant individuel pour l’assis Component 2. Strengthenin Individual Consul 2019-08-2 2019-12-1 2019-10-2 2020-01-2 2019-11-2 2020-04-1 2019-12-0 2020-10-0 tance technique de l’Admini IDA / 59870 g capacities for priority fish Post Open 35,000.00 89,509.64 Signed 2019-08-15 tant Selection 2 3 2 7 7 1 2 8 stration en charge de la Pêc eries management he et de l’Aquaculture et de l’UGP du Projet SWIOFish2 d ans le cadre de la Cogestion MG-MRHP-123343-CS-INDV / Développer la base de don nées intégrée des pêches de Component 2. Strengthenin Madagascar et le registre de Individual Consul 2019-08-2 2019-11-0 2019-10-2 2019-11-2 2020-02-1 2020-01-0 2020-02-2 2020-07-0 IDA / D1720 g capacities for priority fish Post Open 50,000.00 38,851.99 Signed 2019-09-02 s pêcheurs et embarcations tant Selection 2 6 2 7 9 8 0 6 eries management dans une base de donnée b asé sur le Web (lignes des é tudes regroupées: 2.1.2.1.1 3 - 2.1.2.1.13.1 - 2.1.2.1.13. 2) MG-MRHP-28764-CS-INDV// Component 4. Project mana Individual Consul 2018-11-1 2018-12-1 2019-01-1 2019-07-1 MG-PM-187 / Assistants coor IDA / 59870 Post Open 62,400.00 0.00 Canceled 2018-10-01 gement and coordination tant Selection 9 0 4 3 dinateurs locaux UGL MG-MRHP-28735-CS-INDV// Component 3. Strengthenin MG-PM-164 / Recensement g capacities for engaging in Individual Consul 2018-05-0 2018-05-2 2018-06-2 2018-12-2 IDA / 59870 Post Open 20,000.00 0.00 Canceled 2018-02-28 et identification des bénéfici alternative fishing practices tant Selection 4 5 9 6 aires chaque année and livelihoods activities MG-MRHP-127608-CS-INDV Component 4. Project mana Individual Consul 2019-12-2 2020-01-2 2020-03-1 2020-09-0 IDA / 59870 Post Open 1,500.00 0.00 Canceled 2019-09-23 / Assistance technique - mai gement and coordination tant Selection 2 1 2 8 ntenance MG-MRHP-28926-CS-INDV// Component 4. Project mana Individual Consul 2018-03-2 2018-04-1 2018-05-1 2018-11-1 MG-PM-17 / Évaluation seme IDA / 59870 Post Open 3,500.00 0.00 Canceled 2018-01-15 gement and coordination tant Selection 1 1 6 2 strielle du projet MG-MRHP-127606-CS-INDV Component 2. Strengthenin Individual Consul 2019-12-1 2020-01-1 2020-03-0 2020-09-0 / Etude diagnostic sur la pêc IDA / 59870 g capacities for priority fish Post Open 20,000.00 0.00 Canceled 2019-09-18 tant Selection 7 6 7 3 herie crevettière à Madagas eries management car MG-MRHP-141087-CS-INDV Component 4. Project mana Individual Consul 2019-10-2 2019-11-2 2019-12-1 2019-11-2 2019-12-1 2019-11-2 2019-12-1 2022-11-2 / Recrutement d’un Chef Co IDA / 59870 Post Open 39,000.00 22,844.93 Signed 2019-10-31 gement and coordination tant Selection 8 1 1 3 3 7 9 6 mptable (CC) au sein de l’U GP MG-MRHP-141088-CS-INDV Component 4. Project mana Individual Consul 2019-10-2 2019-11-2 2019-12-0 2019-11-2 2019-12-1 2019-11-2 2019-12-1 2022-11-2 IDA / 59870 Post Open 24,000.00 17,668.00 Terminated 2019-10-31 / Recrutement d'un comptab gement and coordination tant Selection 8 1 9 3 3 7 8 6 le MG-MRHP-146229-CS-INDV / Recrutement d’un consulta Component 2. Strengthenin nt national pour animer l’ate Individual Consul 2019-10-1 2019-11-2 2019-10-2 2019-12-0 2019-11-1 2019-12-2 2019-12-0 2020-01-0 IDA / 59870 g capacities for priority fish Post Limited 2,800.00 2,496.64 Signed 2019-11-21 lier national relatif à la com tant Selection 4 6 3 1 3 2 5 5 eries management munication de la nouvelle loi portant Code de la Pêche et de l'Aquaculture à Madagas car MG-MRHP-146231-CS-INDV / Recrutement d’un Assistan t Technique pour les constru Component 4. Project mana Individual Consul 2019-12-0 2019-12-1 2020-01-1 2019-12-2 2020-01-2 2019-12-2 2020-01-2 2022-12-2 IDA / 59870 Post Open 25,000.00 25,491.34 Signed 2019-11-21 ctions et réhabilitations d’ in gement and coordination tant Selection 6 5 7 5 4 9 5 8 frastructures de pêche, com munautaires et administrati ves MG-MRHP-119287-CS-CDS / Component 4. Project mana 2019-10-2 2020-02-1 2020-08-0 Contrôle et surveillance de l IDA / 59870 Post Direct Selection Direct 12,000.00 0.00 Canceled 2019-08-30 gement and coordination 9 1 9 a construction de bureau de l'UGP centrale MG-MRHP-149046-CS-CDS / RECRUTEMENT DE CONSULT ANT NATIONAL POUR ASSUR Component 2. Strengthenin 2019-12-2 2020-01-0 2020-05-1 2020-01-2 2020-09-0 2020-02-0 ER LE RENFORCEMENT DE C IDA / 59870 g capacities for priority fish Post Direct Selection Direct 6,290.00 7,739.85 Signed 2019-12-30 6 5 4 0 5 4 APACITES DES BIOLOGISTES eries management DU CDA DANS LE DOMAINE DE L’AQUACULTURE MARINE ET DULCAQUICOLE (2.1.1.3. 03) MG-MRHP-160293-CS-INDV / Recrutement d'un consulta Component 2. Strengthenin Individual Consul 2020-02-2 2020-03-3 2020-06-1 2020-04-0 2020-09-1 2020-04-2 2020-11-2 2020-08-1 nt pour l'élaboration de proc IDA / 59870 g capacities for priority fish Post Open 15,000.00 86,190.00 Signed 2020-02-27 tant Selection 5 0 8 9 5 3 6 1 édure de délivrance des cart eries management es pêcheurs et d'immatricul ation des pirogues MG-MRHP-160452-CS-INDV Component 2. Strengthenin / Recrutement d’un Assistan Individual Consul 2020-03-0 2020-04-1 2020-07-0 2020-05-1 2020-08-1 2020-05-2 2020-08-1 2022-05-2 IDA / D1720 g capacities for priority fish Post Open 85,000.00 15,207.52 Signed 2020-03-10 t technique pour l’ Appui au tant Selection 6 9 1 0 7 4 9 4 eries management renforcement des capacités opérationnelles du CSP MG-MRHP-160443-CS-CDS / Component 2. Strengthenin Recrutement d'Institut de Fo Under Implemen 2020-03-0 2020-03-1 2020-04-1 2020-04-2 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 3,000.00 0.00 2020-03-09 rmation en technique d'anal tation 1 9 7 7 eries management yse de détection de maladie aquatique MG-MRHP-161605-CS-INDV / Recrutement d'un consulta Component 4. Project mana Individual Consul 2020-03-0 2020-04-2 2020-05-2 2020-05-1 2020-06-2 2020-05-2 2020-06-2 2020-09-2 nt individuel pour la réalisati IDA / 59870 Post Open 100,000.00 34,272.29 Signed 2020-03-13 gement and coordination tant Selection 2 7 6 1 2 5 4 2 on de l’évaluation à mi-parc ours des objectifs du projet SWIOFish2 MG-MRHP-161625-CS-CDS / Component 2. Strengthenin Recrutement d'un BE pour l 2020-03-2 2020-03-2 2020-05-2 2020-05-3 2020-11-0 2021-10-2 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 12,600.00 22,582.18 Signed 2020-03-16 e contrôle et la surveillance 0 6 6 0 6 7 eries management des travaux du CIRAEP Mar oantsetra Page 11 MG-MRHP-159186-CS-CDS / Component 3. Strengthenin Recrutement d'une Associati g capacities for engaging in 2020-04-1 2020-04-1 2020-05-1 2020-05-0 2020-08-1 2021-10-3 on/ONG pour la promotion d IDA / 59870 Post Direct Selection Direct 90,000.00 90,332.42 Signed 2020-03-31 alternative fishing practices 6 0 5 1 9 1 e l'approche Groupe d'Eparg and livelihoods activities ne Communautaire (GEC) Zo ne BATAN (3.2.5.1.02.1) MG-MRHP-165352-CS-CDS / Component 3. Strengthenin Recrutement d'une Associati g capacities for engaging in 2020-04-1 2020-04-1 2020-09-1 2020-05-0 2021-01-1 2021-11-0 on / ONG pour la promotion IDA / 59870 Post Direct Selection Direct 90,000.00 80,997.01 Signed 2020-04-01 alternative fishing practices 6 1 8 2 4 1 de l'approche Groupe d'Epar and livelihoods activities gne Communautaire (GEC) Zone MELAKY (3.2.5.1.02.1) MG-MRHP-165351-CS-CDS / Component 3. Strengthenin Recrutement d'une Associati g capacities for engaging in 2020-04-1 2020-04-2 2020-07-2 2020-05-1 2020-10-0 2021-11-1 on / ONG pour la promotion IDA / 59870 Post Direct Selection Direct 90,000.00 75,162.11 Signed 2020-04-10 alternative fishing practices 6 0 4 1 9 0 de l'approche Groupe d'Epar and livelihoods activities gne Communautaire (GEC) Zone BA (3.2.5.1.02.1) MG-MRHP-167265-CS-CDS / Acquisition et maintenance Component 4. Project mana 2020-04-0 2020-04-2 2020-04-1 2020-06-2 2020-05-1 2020-12-2 d'un Logiciel Informatisé de IDA / 59870 Post Direct Selection Direct 50,000.00 40,829.47 Signed 2020-04-10 gement and coordination 7 0 6 4 2 1 Gestion Administrative, Com ptable, Budgétaire et Financ ière pour le Projet SWIOFish 2 MG-MRHP-119242-CS-INDV Component 2. Strengthenin / Elaboration du plan de dév Individual Consul 2019-11-1 2019-12-1 2020-02-1 2020-08-1 IDA / 59870 g capacities for priority fish Post Open 20,000.00 0.00 Canceled 2019-08-01 eloppement des 3 filières aq tant Selection 4 4 2 0 eries management uaculture (algue,holothurie, crabe) MG-MRHP-149438-CS-INDV / Recrutement d'un Consulta nt individuel pour la facilitati Component 2. Strengthenin on des ateliers de sensibilisa Individual Consul 2020-04-1 2020-06-2 2020-05-2 2020-07-0 2020-09-0 2020-07-1 2020-10-0 2020-09-1 IDA / 59870 g capacities for priority fish Post Limited 3,000.00 8,439.82 Signed 2020-06-19 tion régionale au niveau des tant Selection 6 5 7 2 8 6 8 4 eries management 13 régions côtières, relatifs à la communication de la no uvelle loi portant Code de la Pêche et de l'Aquaculture à Madagascar MG-MRHP-119286-CS-INDV- 2 / Recrutement d’un Consul Component 3. Strengthenin tant individuel pour l’appui t g capacities for engaging in Individual Consul 2020-04-2 2020-06-0 2020-07-2 2020-06-2 2020-08-1 2020-07-0 2020-08-2 2021-07-0 TF / A4588 Post Open 85,000.00 26,683.05 Signed 2020-04-24 echnique à la mise en œuvr alternative fishing practices tant Selection 1 6 4 0 4 4 7 4 e de l’électrification hors gril and livelihoods activities le dans le cadre du projet S WIOFish2 MG-MRHP-28756-CS-INDV// Component 3. Strengthenin MG-PM-178 / Élaboration du g capacities for engaging in Individual Consul 2019-11-0 2019-12-1 2020-01-2 2020-03-2 2020-09-2 IDA / 59870 Post Open 300,000.00 0.00 Canceled 2019-08-30 plan stratégique de dévelop alternative fishing practices tant Selection 5 3 7 7 3 pement local (PCD et PLD) and livelihoods activities MG-MRHP-170896-CS-INDV / Recrutement d'un Consulta Component 2. Strengthenin Individual Consul Under Implemen 2020-05-2 2020-07-0 2020-07-2 2020-09-0 2021-09-0 nt pour la mise en place de IDA / D1720 g capacities for priority fish Post Open 30,000.00 0.00 2020-05-04 tant Selection tation 4 8 9 9 9 Base Des Données et la con eries management ception d'un logiciel de colle cte de données_OEPA MG-MRHP-119288BIS-CS-IN DV / Recrutement d'un resp Component 4. Project mana Individual Consul 2019-08-2 2020-03-2 2020-03-2 2020-04-1 2020-04-1 2020-04-2 2020-04-1 2021-04-2 IDA / 59870 Post 15,000.00 13,822.38 Signed 2019-08-19 onsable en communication gement and coordination tant Selection 8 0 0 7 7 0 8 0 2 de l'UGP SWIOfish2 MG-MRHP-170881-CS-INDV Component 2. Strengthenin / Recrutement d’un consulta Individual Consul 2020-05-1 2020-06-2 2020-09-1 2020-07-1 2020-10-0 2020-08-1 2020-10-2 2021-08-1 IDA / 59870 g capacities for priority fish Post Open 15,000.00 13,828.32 Signed 2020-05-04 nt individuel spécialiste de l tant Selection 3 2 6 3 9 7 0 7 eries management a petite pêche au sein de l’U GP du Projet SWIOFish2 MG-MRHP-170887-CS-INDV / Recrutement d’un consulta Component 3. Strengthenin nt individuel spécialiste du d g capacities for engaging in Individual Consul Under Implemen 2020-05-1 2020-07-0 2020-07-2 2020-08-2 2021-08-2 IDA / 59870 Post Open 15,000.00 0.00 2020-05-15 éveloppement des chaines d alternative fishing practices tant Selection tation 4 3 4 8 8 e valeur de la petite pêche a and livelihoods activities u sein de l’UGP du Projet SW IOFish2 MG-MRHP-173507-CS-INDV Component 2. Strengthenin / Recrutement de consultant Individual Consul Under Implemen 2020-05-1 2020-06-2 2020-06-2 2020-07-1 2020-07-2 IDA / 59870 g capacities for priority fish Post Open 15,000.00 0.00 2020-05-20 Individuel pour la formation tant Selection tation 4 2 9 9 9 eries management en technique d'approche et animation rurale MG-MRHP-173508-CS-INDV Component 2. Strengthenin / Recrutement de consultant Individual Consul Under Implemen 2020-05-1 2020-07-1 2020-08-0 2020-09-0 2020-09-1 IDA / 59870 g capacities for priority fish Post Open 15,000.00 0.00 2020-05-20 Individuel pour formation en tant Selection tation 4 7 7 5 5 eries management technique de négociation et leadership MG-MRHP-119245 BIS1-CS- CDS / Recrutement d'un BE Component 2. Strengthenin pour le Contrôle et surveilla 2019-07-2 2019-08-1 2019-08-1 2019-11-1 2020-03-1 2021-04-1 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 56,000.00 51,918.79 Signed 2019-07-24 nce des travaux de construc 4 4 4 2 8 0 eries management tion de l'UGP SWIOFish2 Nan isana, DRRHP Analanjirojo et ASH Morondava MG-MRHP-119245-CS-CDS / Component 2. Strengthenin Contrôle et surveillance des 2019-07-2 2019-10-1 2019-08-1 2020-01-1 2020-07-1 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 84,000.00 0.00 Canceled 2019-08-01 travaux de constructions po 4 5 4 3 1 eries management ur les six (06) DRRHP et h uit (08) CIRRHP MG-MRHP-172004-CS-INDV / Recrutement d’un consulta Component 2. Strengthenin nt individuel pour l’appui tec Individual Consul 2020-05-2 2020-07-1 2020-08-0 2020-08-0 2020-09-0 2020-09-0 2020-10-0 2023-09-0 IDA / 59870 g capacities for priority fish Post Open 50,000.00 13,512.58 Terminated 2020-05-26 hnique à la mise en œuvre d tant Selection 0 4 7 4 1 8 9 8 eries management es activités d’aquaculture d ans le cadre du projet SWIO Fish2 MG-MRHP-28341 BIS 2-CS-I Component 4. Project mana Individual Consul 2019-02-1 2019-03-1 2019-03-0 2019-03-2 2019-03-0 2019-03-3 2019-03-1 2020-03-2 NDV / Recrutement d'un Co IDA / 59870 Post Open 12,000.00 9,065.16 Terminated 2019-02-18 gement and coordination tant Selection 8 2 6 2 7 0 2 9 mptable remplaçant en 201 9 MG-MRHP-179481-CS-INDV Component 3. Strengthenin / Recrutement d’un formate g capacities for engaging in Individual Consul Under Implemen 2020-06-1 2020-07-3 2020-08-2 2020-09-0 2020-11-3 IDA / 59870 Post Open 50,000.00 0.00 2020-06-18 ur sur la technique de pêche alternative fishing practices tant Selection tation 9 0 0 1 0 moderne and livelihoods activities MG-MRHP-179501-CS-INDV Component 2. Strengthenin / RECRUTEMENT D’UN CONS Individual Consul Under Implemen 2020-07-0 2020-08-0 2020-08-2 2020-09-1 2021-03-1 IDA / 59870 g capacities for priority fish Post Open 10,000.00 0.00 2020-06-19 ULTANT SPÉCIALISTE EN SYS tant Selection tation 7 7 8 1 0 eries management TEME D’INFORMATION GEO GRAPHIQUE (SIG) MG-MRHP-179518-CS-CDS / Recrutement d'une firme po Component 2. Strengthenin 2020-06-2 2020-07-0 2020-07-2 2020-07-2 2020-10-0 2020-08-0 2020-10-2 ur assurer le renforcement d IDA / 59870 g capacities for priority fish Post Direct Selection Direct 10,000.00 23,550.98 Completed 2020-06-22 4 9 2 4 2 8 4 es capacités des agents de l eries management a DGPA à l'IHSM en algocult ure et holothuriculture MG-MRHP-182966-CS-INDV Component 2. Strengthenin / Recrutement d'un consulta Individual Consul Under Implemen 2020-07-2 2020-09-0 2020-09-2 2020-10-3 2023-10-3 IDA / 59870 g capacities for priority fish Post Open 23,400.00 0.00 2020-07-17 nt INDIVIDUEL pour Respons tant Selection tation 2 4 5 0 0 eries management able Local de la composante 2 à Nosy be MG-MRHP-182961-CS-INDV Component 2. Strengthenin / Recrutement d'un consulta Individual Consul 2020-07-2 2020-09-0 2020-10-0 2020-09-2 2020-10-1 2020-10-3 2020-10-2 2023-10-3 IDA / 59870 g capacities for priority fish Post Open 23,400.00 6,449.18 Signed 2020-07-17 nt individuel pour Responsa tant Selection 2 4 7 5 3 0 0 0 eries management ble Local de la composante 2 à Maintirano MG-MRHP-105671-CS-INDV Component 3. Strengthenin / Mise en place, Formation, g capacities for engaging in Individual Consul 2019-03-2 2019-05-1 2019-05-2 2019-07-0 2019-12-2 IDA / 59870 Post Open 60,000.00 0.00 Canceled 2019-03-12 Maintenance et Entretien du alternative fishing practices tant Selection 0 4 8 2 9 système en ligne ou platefor and livelihoods activities me MG-MRHP-119245 BIS2-CS- CDS / Recrutement d'un BE Component 2. Strengthenin 2019-07-2 2020-10-2 2019-08-1 2021-01-2 2021-05-1 2022-06-2 pour le Contrôle et surveilla IDA / 59870 g capacities for priority fish Post Direct Selection Direct 34,500.00 13,383.27 Signed 2020-10-05 4 6 4 4 5 3 nce des travaux de construc eries management tion des CIRRHP Ambanja, A mbilobe, MG-MRHP-119248-CS-INDV Component 2. Strengthenin Individual Consul 2019-11-0 2019-10-1 2019-11-1 2020-01-2 2020-07-2 / Consultance et appui à la IDA / 59870 g capacities for priority fish Post Open 30,600.00 0.00 Canceled 2019-07-01 tant Selection 5 4 3 7 5 composante 2 eries management MG-MRHP-119241-CS-INDV / Assistance juridique pour a Component 2. Strengthenin Individual Consul 2019-08-1 2019-10-3 2019-11-2 2020-01-2 2020-07-2 ppuyer à l’homologation du IDA / 59870 g capacities for priority fish Post Open 10,000.00 0.00 Canceled 2019-08-01 tant Selection 9 0 9 8 6 Dinabe régissant la gestion l eries management ocale des pêcheries au nive au de la Baie d'Antongil MG-MRHP-148888-CS-INDV / Recrutement d’un consulta nt national pour assurer le r Component 2. Strengthenin enforcement de capacité de Individual Consul Pending Implem 2020-09-3 2020-10-0 2020-10-1 2020-10-3 IDA / 59870 g capacities for priority fish Post Limited 1,000.00 0.00 2020-09-24 s agents de l’administration tant Selection entation 0 7 7 1 eries management des pêches et des responsa bles des textes administratif s en technique d'approche e t d’animation rurale (2.1.1.1 .04) MG-MRHP-189680-CS-INDV / Recrutement d'un (e) secré Component 4. Project mana Individual Consul 2020-10-0 2020-10-1 2020-10-2 2023-10-2 IDA / 59870 Post Open 15,000.00 0.00 Canceled 2020-09-15 taire en passation des marc gement and coordination tant Selection 9 9 3 3 hés du projet SWIOFish2 MG-MRHP-160194-CS-INDV / Recrutement d'un assistan Component 4. Project mana Individual Consul 2020-02-2 2020-03-2 2020-04-0 2020-04-0 2023-04-0 IDA / 59870 Post Open 20,000.00 0.00 Canceled 2020-02-27 t en passation des marchés gement and coordination tant Selection 5 2 1 5 5 de l'UGP-SWIOFish2 MG-MRHP-197771-CS-INDV / Recrutement d'un Consulta Component 4. Project mana Individual Consul 2020-10-2 2020-11-1 2021-01-3 2020-11-2 2021-02-0 2020-12-0 2021-02-2 2023-09-0 IDA / 59870 Post Open 21,000.00 6,389.81 Signed 2020-10-13 nt individuel Assistant en Pa gement and coordination tant Selection 0 6 0 2 1 3 7 3 ssation des Marchés de l'UG P SWIOFish2 MG-MRHP-197821-CS-INDV / Recrutement d'un Consulta Component 4. Project mana Individual Consul 2020-10-1 2020-10-2 2021-05-0 2020-11-0 2021-05-0 2020-11-2 2021-05-1 2023-09-2 IDA / 59870 Post Limited 11,900.00 3,071.04 Signed 2020-10-13 nt individuel Secrétaire de la gement and coordination tant Selection 3 3 5 6 7 2 1 1 Passation des Marchés de l' UGP SWIOFish2 MG-MRHP-197817-CS-INDV / Recrutement d'un Consulta Component 4. Project mana Individual Consul 2020-11-1 2020-11-1 2021-03-0 2020-11-2 2021-03-0 2020-12-0 2021-03-0 2023-09-0 IDA / 59870 Post Open 21,000.00 11,362.85 Signed 2020-10-13 nt individuel Gestionnaire de gement and coordination tant Selection 6 6 2 2 4 5 9 5 contrats de l'UGP SWIOFish2 MG-MRHP-203594-CS-INDV Component 2. Strengthenin / Recrutement d'un consulta Individual Consul Under Implemen 2020-11-2 2021-01-0 2021-01-2 2021-02-0 2024-02-0 IDA / 59870 g capacities for priority fish Post Open 23,400.00 0.00 2020-11-20 nt individuel pour Responsa tant Selection tation 1 1 2 5 5 eries management ble Local de la composante 2 à Mananara Nord MG-MRHP-203595-CS-INDV Component 2. Strengthenin / Recrutement d'un consulta Individual Consul Under Implemen 2020-11-2 2021-01-0 2021-01-2 2021-02-0 2024-02-0 IDA / 59870 g capacities for priority fish Post Open 23,400.00 0.00 2020-11-20 nt individuel pour Responsa tant Selection tation 1 1 2 5 5 eries management ble Local de la composante 2 à Maroantsetra MG-MRHP-203596-CS-INDV Component 3. Strengthenin / Recrutement d'un consulta g capacities for engaging in Individual Consul 2020-11-2 2020-11-2 2021-01-1 2020-12-1 2021-01-1 2021-01-2 2021-01-2 2023-09-2 IDA / 59870 Post Limited 23,400.00 6,449.18 Signed 2020-11-20 nt individuel pour Responsa alternative fishing practices tant Selection 1 5 4 6 5 0 1 3 ble Local de la Composante and livelihoods activities 3 à Maintirano Page 12 MG-MRHP-203597-CS-INDV Component 3. Strengthenin / Recrutement des consultan g capacities for engaging in Individual Consul Under Implemen 2020-11-2 2021-01-0 2021-01-2 2021-02-1 2023-09-2 ts individuels pour Responsa IDA / 59870 Post Open 46,800.00 0.00 2020-11-20 alternative fishing practices tant Selection tation 1 1 2 2 3 ble Local de la Composante and livelihoods activities 3 à Maroantsetra et Nosy Be MG-MRHP-28348-CS-INDV/ Component 4. Project mana Individual Consul Pending Implem 2021-08-0 2021-08-2 2021-10-0 2022-04-0 MG-PM-44 / Réalisation du B IDA / 59870 Post Open 8,000.00 0.00 2021-06-03 gement and coordination tant Selection entation 7 8 9 7 ulletin trimestriel SWIOFish2 MG-MRHP-223821-CS-CDS / Recrutement d'un BE pour ET, PGES, C&S de travaux d e construction de la clôture Component 2. Strengthenin 2021-03-1 2021-03-2 2021-03-2 2021-05-3 2021-09-2 2021-07-2 de l’enceinte et mise en pla IDA / 59870 g capacities for priority fish Post Direct Selection Direct 40,000.00 15,938.40 Signed 2021-03-16 4 6 6 0 8 9 ce d’un point d’eau autono eries management me du bureau de la CirAEP Maroantsetra, construction du Hangar et bureau de la brigade CSP Analanjirofo MG-MRHP-223828-CS-INDV / Recrutement d’un troisièm Component 4. Project mana Individual Consul Under Implemen 2021-03-2 2021-04-2 2021-04-2 2021-04-2 2023-09-2 IDA / 59870 Post Open 15,600.00 0.00 2021-03-30 e Comptable pour l’Unité de gement and coordination tant Selection tation 6 0 2 6 9 Gestion du Projet SWIOFish2 MG-MRHP-227230-CS-INDV Component 4. Project mana Individual Consul 2021-04-0 2021-05-2 2021-09-1 2021-06-1 2021-11-1 2021-07-2 2021-11-2 2021-10-1 / Recrutement d'un SIGiste a IDA / 59870 Post Open 15,000.00 15,563.24 Signed 2021-04-07 gement and coordination tant Selection 9 6 0 6 9 1 7 9 u niveau de l'UGP SWIOFish 2 MG-MRHP-229415-CS-CDS / Recrutement d'un responsa Component 4. Project mana Under Implemen 2021-05-2 2021-04-2 2021-05-1 2023-09-2 IDA / 59870 Post Direct Selection 52,600.00 0.00 2021-04-22 ble en passation des marché gement and coordination tation 3 8 5 9 s du projet SWIOFish2 MG-MRHP-229418-CS-INDV / Recrutement d'un Consulta Component 4. Project mana Individual Consul 2021-10-2 2021-04-2 2022-03-0 2021-05-0 2022-03-1 2021-05-1 2022-03-2 2023-09-2 IDA / 59870 Post Limited 52,000.00 7,736.16 Signed 2021-04-22 nt individuel Gestionnaire de gement and coordination tant Selection 0 9 8 6 1 5 3 9 contrats de l'UGP SWIOFish2 (2021) MG-MRHP-161616-CS-CDS / Recrutement d'un BE pour l Component 2. Strengthenin 2020-03-2 2020-03-2 2020-05-2 2020-05-2 2021-10-2 e contrôle et surveillance de IDA / 59870 g capacities for priority fish Post Direct Selection Direct 41,500.00 0.00 Canceled 2020-03-12 0 2 6 6 3 s travaux des DRAEP à Andr eries management oy, Anosy et Atsimo Atsinan ana MG-MRHP-161621-CS-CDS / Recrutement d'un BE pour l Component 2. Strengthenin 2020-03-2 2020-03-2 2020-05-2 2020-05-2 2021-10-2 e contrôle et la surveillance IDA / 59870 g capacities for priority fish Post Direct Selection Direct 51,000.00 0.00 Canceled 2020-03-13 0 3 6 7 4 des travaux du DRAEP et CI eries management RAEP à Maintirano, des CIRA EP à Besalampy et à Masoar ivo MG-MRHP-231606-CS-INDV / Recrutement consultant in Component 2. Strengthenin Individual Consul 2021-05-0 2021-07-0 2021-06-2 2021-07-2 2021-10-0 2021-09-0 2021-11-0 2022-09-0 dividuel pour développemen IDA / D1720 g capacities for priority fish Post Open 15,000.00 47,116.80 Signed 2021-05-20 tant Selection 7 8 3 9 8 2 5 2 t de Base des Donnés du Ce eries management ntre de Surveillance Pêche ( CSP) MG-MRHP-236864-CS-INDV / Recrutement d’un Consulta nt individuel pour effectuer Component 2. Strengthenin Individual Consul Under Implemen 2021-08-0 2021-08-1 2021-09-0 2021-10-1 2021-12-1 la mise à jour du Plan d’Acti TF / A4588 g capacities for priority fish Post Open 100,000.00 0.00 2021-06-30 tant Selection tation 6 8 8 3 2 on National de lutte contre l eries management a pêche Illicite Non Déclarée et Non Réglementée (PAN IN N) de Madagascar MG-MRHP-119285-CS-CDS / Component 3. Strengthenin Contrôles et surveillances d g capacities for engaging in 2022-01-2 2022-05-1 2022-11-1 IDA / 59870 Post Direct Selection Direct 60,000.00 0.00 Canceled 2021-11-30 es infrastructures d'électrific alternative fishing practices 9 4 0 ation hors grille dans les co and livelihoods activities mmunautés pilotes MG-MRHP-119281-CS-CDS / Component 2. Strengthenin Contrôle et surveillance des 2021-06-2 2021-10-2 2022-04-2 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 60,000.00 0.00 Canceled 2021-04-30 constructions de marchés co 9 7 5 eries management uverts aux produits halieutiq ues Component 3. Strengthenin MG-MRHP-252968-CS-INDV g capacities for engaging in Individual Consul 2021-10-1 2021-11-3 2021-10-2 2021-12-2 2021-11-0 2022-01-2 2021-11-1 2023-01-2 / Recrutement d’un Assistan IDA / 59870 Post Open 15,000.00 6,796.71 Signed 2021-10-11 alternative fishing practices tant Selection 2 0 2 1 3 5 7 5 t Technique Foncier and livelihoods activities MG-MRHP-256410-CS-INDV Component 4. Project mana Individual Consul 2021-12-2 2021-11-0 2022-02-2 2021-11-1 2022-03-0 2021-11-2 2022-03-0 2023-09-2 / Recrutement d'un comptab IDA / 59870 Post Open 24,000.00 8,042.13 Signed 2021-10-18 gement and coordination tant Selection 0 8 5 5 1 4 8 9 le 2021 (Remplacement co mptable 2) MG-MRHP-285250-CS-CDS / Component 2. Strengthenin Analyse des problématiques Under Implemen 2022-04-1 2022-04-1 2022-06-0 2022-06-1 2022-12-1 IDA / 59870 g capacities for priority fish Post Direct Selection Direct 20,000.00 0.00 2022-04-05 liées à l’utilisation des senn tation 5 5 2 9 6 eries management es de plage dans la baie d’A ntongil MG-MRHP-289654-CS-INDV / Responsable Local de la Co Component 3. Strengthenin mposante 3 (RLC3) « Appui g capacities for engaging in Individual Consul Pending Implem 2022-05-3 2022-06-2 2022-07-1 2025-02-1 à l’adhésion des populations IDA / 59870 Post Open 22,000.00 0.00 2022-04-18 alternative fishing practices tant Selection entation 0 0 1 8 cibles à la gestion durable d and livelihoods activities es pêcheries cibles/Promotio n des activités alternatives » dans les Districts de Maro antsetra MG-MRHP-252785-CS-INDV / Recrutement d'un Respons Component 4. Project mana Individual Consul 2021-09-1 2021-10-1 2021-10-2 2021-11-0 2023-09-3 IDA / 59870 Post Open 32,400.00 0.00 Canceled 2021-09-23 able Administratif et Financi gement and coordination tant Selection 5 3 3 6 0 er pour le Projet SWIOFish2 ( 2021) MG-MRHP-119282-CS-CDS / Contrôle et surveillance des constructions de hangars av Component 3. Strengthenin ec des materiaux locaux po g capacities for engaging in 2022-01-1 2022-05-1 2022-11-0 ur entretenir les moteurs, le IDA / 59870 Post Direct Selection Direct 48,000.00 0.00 Canceled 2021-11-12 alternative fishing practices 1 1 7 s embarcations et des engin and livelihoods activities s de pêche autorisés et d'un e base de réunion, sensibilis ation et de structuration des utilisateurs petites infrastru MG-MRHP-119283-CS-CDS / Component 3. Strengthenin Contrôles et surveillances d g capacities for engaging in 2022-01-1 2022-04-2 2022-10-2 IDA / 59870 Post Direct Selection Direct 120,000.00 0.00 Canceled 2021-11-12 es constructions d'infrastruc alternative fishing practices 1 6 3 tures communautaires /com and livelihoods activities munales MG-MRHP-119280-CS-CDS / Component 3. Strengthenin Contrôle et surveillance des g capacities for engaging in 2022-01-2 2022-04-2 2022-10-2 IDA / 59870 Post Direct Selection Direct 70,000.00 0.00 Canceled 2021-11-12 constructions de petites déb alternative fishing practices 6 6 3 arcadères type ponton and livelihoods activities MG-MRHP-28325-CS-INDV// Component 3. Strengthenin MG-PM-29 / Élaboration de p g capacities for engaging in Individual Consul 2022-11-1 2022-12-1 2023-02-1 2023-08-1 IDA / 59870 Post Open 30,000.00 0.00 Canceled 2022-09-02 lan de formation des cadres alternative fishing practices tant Selection 7 7 5 4 et élus au niveau local and livelihoods activities MG-MRHP-189660-CS-INDV / Recrutement d'un consulta Component 2. Strengthenin nt individuel pour le renforc Individual Consul Pending Implem 2022-08-0 2022-08-2 2022-09-1 2022-09-2 IDA / 59870 g capacities for priority fish Post Open 4,000.00 0.00 2022-07-01 ement de capacités de l'équ tant Selection entation 6 7 0 2 eries management ipe du service personnel du secteur pêche et aquacultur e en gestion des ressources humaines MG-MRHP-190572-CS-INDV / Recrutement d'un consulta nt individuel pour le renforc Component 2. Strengthenin ement de capacités des age Individual Consul Pending Implem 2022-10-0 2022-10-2 2022-11-1 2022-12-0 IDA / 59870 g capacities for priority fish Post Open 4,000.00 0.00 2022-09-01 nts de l'administration en dé tant Selection entation 7 8 1 8 eries management veloppement d'application web sous HTML, CSS et Java Script et pratique de dévelo ppement en WEBDEV MG-MRHP-292939-CS-INDV / Assistant Technique 2 pour Component 4. Project mana Individual Consul Under Implemen 2022-06-1 2022-06-0 2022-06-1 2022-06-1 2025-06-1 les constructions et réhabilit IDA / 59870 Post Open 25,000.00 0.00 2022-05-09 gement and coordination tant Selection tation 0 2 2 6 5 ations d'infrastructures de p êche, communautaires et ad ministratives MG-MRHP-280897-CS-CDS / Mise à jour des études techn iques relatives à la construct ion du bureau administratif Component 2. Strengthenin Under Implemen 2022-06-0 2022-05-1 2022-06-0 2022-07-2 2023-01-1 de l’UGP SWIOFish2 Nanisan IDA / 59870 g capacities for priority fish Post Direct Selection Direct 26,000.00 0.00 2022-05-06 tation 2 6 8 0 6 a et Contrôle et surveillance eries management de la construction du nouve au bureau logement et de la réhabilitation du bureau log ement existant Farafangana MG-MRHP-297266-CS-INDV / Recrutement d'un consulta Component 2. Strengthenin nt pour la création d'un site Individual Consul 2022-07-1 2022-08-0 2022-09-1 2022-08-2 2022-10-0 2022-09-0 2022-12-0 IDA / 59870 g capacities for priority fish Post Open 15,000.00 0.00 Signed 2022-06-10 web de design et de base de tant Selection 3 5 2 6 7 9 8 eries management données pour la gestion des autorisations et des licences des pêches MG-MRHP-298184-CS-INDV Component 4. Project mana Individual Consul Under Implemen 2022-06-2 2022-08-0 2022-08-2 2022-09-2 2023-09-2 / Recrutement d'un comptab IDA / 59870 Post Open 24,000.00 0.00 2022-06-16 gement and coordination tant Selection tation 4 4 5 9 9 le 3 remplaçant MG-MRHP-298211-CS-CDS / Recrutement d’une organisa tion non-gouvernementale p Component 3. Strengthenin our la promotion des groupe g capacities for engaging in Under Implemen 2022-06-1 2022-06-2 2022-07-1 2023-07-1 s d’épargne communautaire IDA / 59870 Post Direct Selection Direct 90,000.00 0.00 2022-06-17 alternative fishing practices tation 0 7 8 8 (GEC) au niveau des district and livelihoods activities s de Farafangana et Vangain drano - regions Atsimo Atsin anana et des districts d’Amb ovombe, Tsihombe et Beloh a - région And MG-MRHP-296823-CS-INDV / Recrutement d'un Assista Component 4. Project mana Individual Consul 2022-08-1 2023-02-1 IDA / 59870 Post Open 25,000.00 0.00 Canceled nt Technique national au Mi gement and coordination tant Selection 7 3 nistère de la Pêche et de l'E conomie Bleue (MPEB) MG-MRHP-296823-CS-INDV_ 2 / Recrutement d'un Assist Component 4. Project mana Individual Consul 2022-06-2 2022-08-1 2022-07-1 2022-09-0 2022-07-1 2022-10-1 2022-08-0 2023-04-1 IDA / 59870 Post Open 25,000.00 7,215.66 Signed 2022-06-30 ant Technique national au M gement and coordination tant Selection 9 8 3 8 9 3 2 1 inistère de la Pêche et de l'E conomie Bleue (MPEB) MG-MRHP-303933-CS-CDS / Recrutement d'un formateur Component 3. Strengthenin relatif au renforcement de c g capacities for engaging in Direct - Internatio Under Implemen 2022-07-2 2022-08-0 2022-10-0 2023-08-0 IDA / 59870 Post Direct Selection 500,000.00 0.00 2022-07-22 apacité sur les techniques d alternative fishing practices nal tation 1 1 5 1 e fumage des produits halie and livelihoods activities utiques et construction de fu moirs FTT MG-MRHP-231604-CS-INDV / Recrutement d’un Consulta Component 2. Strengthenin nt Individuel pour effectuer Individual Consul 2022-07-2 2022-09-0 2022-10-1 2022-09-3 2022-11-1 2022-11-0 2023-09-2 TF / A4588 g capacities for priority fish Post Open - National 32,500.00 0.00 Signed 2022-07-22 un Audit des activités de Sur tant Selection 2 9 8 0 0 4 9 eries management veillance, réalisées par le Ce ntre de Surveillance des Pêc hes (CSP) de Madagascar. Page 13 MG-MRHP-304398-CS-CDS / Recrutement d'un consultan Component 2. Strengthenin Under Implemen 2022-07-2 2022-08-0 2022-07-2 2022-10-0 2023-09-2 t pour la modification tablea TF / A4588 g capacities for priority fish Post Direct Selection Direct - National 20,000.00 0.00 2022-07-22 tation 1 1 5 5 9 u de bord et création de mo eries management dules dans le SIP et OPENAR TFISH MG-MRHP-308538-CS-CDS / Renouvellement des contrat Component 3. Strengthenin s de prestation des organisa g capacities for engaging in 2022-09-2 2022-08-2 2022-09-2 2022-11-0 2023-05-0 tions non-gouvernementales IDA / 59870 Post Direct Selection Direct - National 180,000.00 0.00 Signed 2022-08-19 alternative fishing practices 7 9 9 2 1 pour la promotion des group and livelihoods activities es d’épargne communautair e (GEC) au niveau des ZUP MELAKY et BAIE d’ANTONGIL MG-MRHP-308722-CS-CDS / Renouvellement des contrat Component 3. Strengthenin s de prestation des organisa g capacities for engaging in Under Implemen 2022-09-2 2022-08-2 2022-09-2 2022-10-3 2023-04-2 IDA / 59870 Post Direct Selection Direct - National 90,000.00 0.00 2022-08-17 tions non-gouvernementales alternative fishing practices tation 7 7 9 1 9 pour la promotion des group and livelihoods activities es d’épargne communautair e (GEC) au niveau des ZUP BATAN MG-MRHP-320114-CS-INDV Component 3. Strengthenin / Recrutement d'un Assistan g capacities for engaging in Individual Consul 2022-10-2 2022-11-0 2023-01-1 2022-11-1 2023-01-1 2022-12-1 2023-08-1 IDA / 59870 Post Open - National 20,000.00 0.00 Signed 2022-10-14 t spécialiste sauvegarde env alternative fishing practices tant Selection 4 9 1 0 3 4 6 ironnemental et social and livelihoods activities MG-MRHP-334021-CS-INDV Component 4. Project mana Individual Consul Under Implemen 2023-01-3 2023-02-1 2023-02-2 2023-03-1 2023-09-2 IDA / 59870 Post Open - National 16,000.00 0.00 2023-01-10 / Recrutement d'un 4ème co gement and coordination tant Selection tation 0 2 6 2 9 mptable MG-MRHP-336492-CS-INDV Component 4. Project mana Individual Consul Under Implemen 2023-01-3 2023-02-2 2023-03-1 2023-04-0 2023-09-2 / Recrutement d'un Chef Co IDA / 59870 Post Open - National 8,000.00 0.00 2023-01-30 gement and coordination tant Selection tation 0 5 1 1 9 mptable (CC) au sein de l'U GP 2023 MG-MRHP-336490-CS-CDS / Recrutement d'un Responsa Component 4. Project mana 2023-02-1 2023-02-2 2023-02-2 2023-03-0 2023-10-1 IDA / 59870 Post Direct Selection Direct - National 15,000.00 0.00 Signed 2023-02-15 ble Administratif et Financie gement and coordination 7 0 4 3 5 r au sein de l'UGP 2023 MG-MRHP-299084-CS-INDV / Recrutement d'un Assista Component 4. Project mana Individual Consul 2022-06-2 2022-08-1 2022-09-0 2022-10-1 2023-04-1 nt Technique international IDA / 59870 Post Open 35,000.00 0.00 Canceled 2022-06-30 gement and coordination tant Selection 9 8 8 3 1 au Ministère de la Pêche et de l'Economie Bleue (MPEB) MG-MRHP-5189-CS-INDV / E Component 2. Strengthenin tude sur l'adaptation des mi Individual Consul 2017-04-0 2017-04-2 2017-05-3 2017-11-2 IDA / Q9790 g capacities for priority fish Post Open 15,000.00 0.00 Canceled 2017-02-15 ssions et attributions du MR tant Selection 5 6 1 7 eries management HP par rapport aux défis du développement rural Page 14 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: March 2017] 2. Date of General Procurement Notice: Sep 28, 2015 3. Period covered by this procurement plan: The procurement period of project covered from year March 2017 till April 2017. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 4 million All 2. NCB (Goods) Above US$ 4 million First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 2. Prequalification. Bidders for works activities shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank loan Project issued by The Council For Development and Reconstruction. 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) Review P-Q Expected Contract Proc. by Bank Ref. No. (Yes/No Bid Opening (Description) Method (Prior/Pos ) Date t) Expansion of sewage collection to QC1W1 ICB/NCB No Prior March 2017 connect to the Zahlé WWTP Expansion of sewage network to September QC1W2 ICB/NCB No Prior connect to the Anjar WWTP 2018 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2 million 2. Single Source (Firms) All 3. Individual Above US$ 400,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 4. Consultancy Assignments with Selection Methods and Time Schedule Expected Review by Selection Proposals Ref. No. Description of Assignment Bank Method Submission (Prior/Post) Date Post Supervision of sewage collection to QC1C1 QCBS (Prior of March 2017 connect to the Zahlé WWTP TOR) Post Design of sewage network to connect to QC1C2 SSS (Prior of March 2017 the Anjar WWTP TOR) Post Supervision of sewage network to December QC1C3 QCBS (Prior of connect to the Anjar WWTP 2018 TOR) Post Design and supervision of sewage September QC1C4 QCBS (Prior of network to connect to the Aitanit WWTP 2017 TOR) SSS QC2C1 Promote the use of GAP, including IPM Prior March 2017 (FAO) Post Technical studies and training in solid September QC3C1 QCBS (Prior of waste management - MoE 2017 TOR) Post QC3C2 Water expert- LRA IC (Prior of TOR) Post QC3C3 Communication expert - LRA IC (Prior of TOR) Post QC3C6 Capacity building and training BWE (Prior of TOR) Post QC3C8 Capacity building and training of MoEW (Prior of TOR) PMU and training (part-time procurement; Prior of QC3C11 part-time environmental/social; part time IC TORs FM) Post QC3C12 Audit report LCS (Prior of February 2016 TOR) PROCUREMENT Lebanon : Lake Qaraoun Pollution Prevention Project PLAN General Information Country: Lebanon 2017-03-27 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147854 GPN Date: Project Name: Lake Qaraoun Pollution Prevention Project Loan / Credit No: IBRD / 86370 Council for Development and Reconstruction Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1W1 / Expansion of sewa Component 1: Improvement Open - Internationa Single Stage - One E 10,539,562. 2020-03-1 ge collection to connect to th IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids Signed 2017-03-27 2017-03-31 2017-03-29 2017-06-02 2017-06-02 2017-08-01 2017-10-04 2017-09-15 2017-10-13 l nvelope 49 5 e Zahlé WWTP on QC1W2 / Expansion of sewa Component 1: Improvement Open - Internationa Single Stage - One E 2022-12-1 IBRD / 86370 Prior Request for Bids 0.00 Canceled 2018-08-30 2020-12-01 2018-09-29 2021-01-08 2018-12-28 2021-02-18 2019-03-28 2021-08-19 2019-06-11 ge network to connect to the of Municipal Sewage Collecti l nvelope 0 Anjar WWTP on QC1W3 / Expansion of sewa Component 1: Improvement Single Stage - One E 2,522,112.6 2020-12-1 ge network to connect to the IBRD / 86370 of Municipal Sewage Collecti Post Request for Bids Open - National Signed 2018-04-16 2018-05-10 2018-05-16 2018-05-31 2018-06-30 2018-07-31 2018-09-28 2019-05-30 2018-12-12 2019-12-10 nvelope 2 1 Aitanit WWTP on QC1W2A / Expansion of the Request for B Wastewater Collection Netwo Component 1: Improvement ids - Works ( Open - Internationa Single Stage - One E 2023-06-1 rks (Anjar, Majdel Anjar & Qa IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids without preq 0.00 Canceled 2021-06-03 2021-06-10 2021-09-09 2021-11-04 2021-12-16 l nvelope 5 bb Elias) to Connect to Anjar on ualification) El Marj Wastewater Treatmen SPD t Plant – Lot 1 QC1W2B / Expansion of the Request for B Wastewater Collection Netwo Component 1: Improvement ids - Works ( Open - Internationa Single Stage - One E 8,748,427.0 2023-06-2 rks (Anjar, Majdel Anjar & Qa IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids without preq Signed 2021-06-10 2021-09-28 2021-06-17 2021-10-27 2021-09-16 2021-12-10 2021-11-11 2022-05-20 2021-12-30 2022-06-17 l nvelope 2 9 bb Elias) to Connect to Anjar on ualification) El Marj Wastewater Treatmen SPD t Plant – Lot 1 QC1W2C / Expansion of the Request for B Wastewater Collection Netwo Component 1: Improvement ids - Works ( Open - Internationa Single Stage - One E 2024-03-1 rks (Anjar, Majdel Anjar & Qa IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids without preq 0.00 Signed 2022-01-24 2022-04-10 2022-02-28 2022-04-21 2022-05-09 2022-06-06 2022-07-04 2023-01-19 2022-09-12 2023-04-06 l nvelope 1 bb Elias) to Connect to Anjar on ualification) El Marj Wastewater Treatmen SPD t Plant – Lot 2 Request for QC1W4 / Construction of Te Component 1: Improvement Quotations ( 2022-08-3 mporary Sludge Disposal Faci IBRD / 86370 of Municipal Sewage Collecti Post Direct Selection Direct 0.00 Signed 2022-07-14 2022-09-14 2022-07-21 2022-05-20 2022-08-25 Non Bank-SP 1 lity to Zahlé Wastewater Trea on D) tment Plant Request for P roposal Work s and Operati QC1W5 / Design and Constr Component 1: Improvement on Service - uction of Sludge Solar Dryers Request for Propo Open - Internationa Single Stage - Two E Under Revie 2025-01-3 IBRD / 86370 of Municipal Sewage Collecti Prior Design, Build 0.00 2023-05-18 2023-08-17 2023-08-17 2023-05-25 2023-10-26 2023-12-28 2024-02-01 for Zahlé Wastewater Treatm sals l nvelope w 1 on and Operatio ent Plant n for Water a nd Wastewat er Treatment Plants SPD (S QC1W1A / Remaining Works ingle-stage) Request for B Related to the Expansion of S Component 1: Improvement ids - Works ( Open - Internationa Single Stage - One E Pending Imp 2024-10-1 ewage Networks to Connect t IBRD / 86370 of Municipal Sewage Collecti Prior Request for Bids without preq 0.00 2023-06-29 2023-07-06 2023-08-24 2023-10-19 2023-12-14 l nvelope lementation 3 o Zahle and to Aitanit Waste on ualification) water Treatment Plants SPD GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3. Solid Waste M QC3G1 / Purchase of water anagement, Water Quality M Under Imple IBRD / 86370 Post Direct Selection Direct 0.00 2018-07-18 2019-05-27 2018-07-23 2018-10-06 2019-04-04 monitoring stations onitoring, Capacity Building mentation and Project Management Component 3. Solid Waste M QC3G2 / Refurbishment of S anagement, Water Quality M Open - Internationa Single Stage - One E Pending Impl olid Waste Management Facil IBRD / 86370 Prior Request for Bids 0.00 2023-06-15 2023-06-22 2023-08-03 2023-09-07 2023-10-19 2024-10-18 onitoring, Capacity Building l nvelope ementation ities in the Upper Litani Basin and Project Management NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1NC1 / Operation and Mai Component 1: Improvement ntenance of Zahlé Wastewat IBRD / 86370 of Municipal Sewage Collecti Prior Direct Selection Direct 0.00 Signed 2022-06-17 2022-09-22 2022-06-24 2022-11-04 2022-08-05 2022-08-31 er Treatment Plant on CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1C1 / Supervision of sewa Component 1: Improvement Quality And Cost- Open - Internationa ge collection to connect to th IBRD / 86370 of Municipal Sewage Collecti Post 378,622.27 Signed 2016-10-28 2016-10-28 2016-12-08 2017-05-02 2017-07-31 2017-07-01 2017-09-14 2017-07-31 2017-11-13 2017-09-09 2018-01-03 2017-11-23 2018-03-26 2021-05-24 Based Selection l e Zahlé WWTP on Component 2. Promotion of QC2C1 / Promote the use of UN Agencies (Dire IBRD / 86370 Good Agricultural Practices ( Prior Direct 1,500,000.00 Signed 2017-06-08 2017-06-09 2021-06-08 GAP, including IPM ct) Including Integrated Pest Ma nagement) QC1C3 / Supervision of sewa Component 1: Improvement Quality And Cost- Open - Internationa IBRD / 86370 Prior 366,200.00 Signed 2018-08-30 2019-11-06 2018-09-29 2020-01-15 2019-01-27 2020-11-11 2019-02-26 2021-02-12 2019-03-28 2021-04-08 2019-05-27 2021-10-19 2019-08-10 2021-11-16 2023-02-08 ge network to connect to the of Municipal Sewage Collecti Based Selection l Anjar WWTP on Page 1 Component 3. Solid Waste M QC3C1A / Studies for Closur anagement, Water Quality M Quality And Cost- e and Rehabilitation of Bar El IBRD / 86370 Post Open - National 67,237.25 Signed 2018-08-02 2019-06-06 2018-08-02 2018-08-02 2019-12-16 2019-05-03 2020-02-03 2019-05-31 2020-06-17 2019-07-12 2020-07-22 2019-08-30 2020-11-10 2020-06-30 onitoring, Capacity Building Based Selection ias Dumpsite and Project Management QC3C1B / Studies for the Ass Component 3. Solid Waste M essment of Odor Impact from anagement, Water Quality M Quality And Cost- Open - Internationa IBRD / 86370 Post 72,944.54 Signed 2018-08-02 2018-08-02 2018-08-02 2019-06-10 2018-08-02 2019-12-16 2019-05-31 2020-02-19 2019-06-28 2020-06-17 2019-08-09 2020-07-29 2019-09-27 2021-04-09 2020-05-29 Solid Waste Management Fac onitoring, Capacity Building Based Selection l ilities and Landfills and Project Management Component 3. Solid Waste M QC3C2 / LRA Water Governa anagement, Water Quality M Quality And Cost- Open - Internationa IBRD / 86370 Post 0.00 Canceled 2018-08-02 2018-06-30 2018-08-02 2019-05-03 2018-08-02 2019-10-11 2019-04-15 2020-02-18 2019-05-13 2019-06-24 2019-08-12 2021-02-15 nce Study onitoring, Capacity Building Based Selection l and Project Management Component 3. Solid Waste M QC3C12 / Website for Litani anagement, Water Quality M Quality And Cost- River (20 weeks) + 1-year M IBRD / 86370 Post Open - National 63,314.50 Signed 2018-08-30 2018-09-05 2018-08-30 2018-08-30 2019-01-17 2019-03-07 2019-03-07 2019-04-04 2019-03-28 2019-05-16 2019-06-11 2019-07-04 2019-10-21 2022-07-04 onitoring, Capacity Building Based Selection aintenance + 3-year Hosting and Project Management QC1C4B / Supervision of sew Component 1: Improvement Quality And Cost- age network to connect to th IBRD / 86370 of Municipal Sewage Collecti Post Open - National 62,344.00 Signed 2018-04-16 2019-04-16 2018-12-28 2019-04-18 2019-05-02 2019-05-16 2019-05-24 2019-06-13 2019-07-17 2019-07-04 2019-11-27 2019-08-01 2020-03-03 2020-07-31 Based Selection e Aitanit WWTP on QC3C1C / Strategic Environ Component 3. Solid Waste M mental and Social Assessme anagement, Water Quality M Quality And Cost- Open - Internationa IBRD / 86370 Post 104,925.00 Signed 2019-09-19 2019-07-04 2019-10-31 2020-04-23 2019-12-26 2020-12-11 2020-02-20 2021-02-16 2020-03-19 2021-03-11 2020-04-23 2021-04-22 2020-06-01 2021-11-24 2021-03-31 nt Study for the National Inte onitoring, Capacity Building Based Selection l grated Solid Waste Strategy and Project Management Component 3. Solid Waste M QC3C7B / Upgrading IT Syst anagement, Water Quality M Quality And Cost- Under Implement IBRD / 86370 Post Open - National 0.00 2020-06-16 2020-09-29 2020-07-14 2021-11-01 2020-08-11 2020-09-08 2020-09-29 2020-10-20 2020-12-01 2021-05-31 em - BWE onitoring, Capacity Building Based Selection ation and Project Management Component 3. Solid Waste M QC3C6D / Sustainability Stu anagement, Water Quality M Quality And Cost- Open - Internationa Under Implement dy of Wastewater Services in IBRD / 86370 Post 0.00 2021-12-19 2021-12-29 2022-02-13 2022-03-01 2022-03-27 2022-10-19 2022-04-24 2022-11-29 2022-05-22 2023-03-30 2022-06-26 2022-08-07 2023-02-06 onitoring, Capacity Building Based Selection l ation Aitanit, Zahle and Anjar. and Project Management QC1C1B / Supervision of the Remaining Works Related to Component 1: Improvement Quality And Cost- Open - Internationa the Expansion of Sewage Net IBRD / 86370 of Municipal Sewage Collecti Post 0.00 Under Review 2023-06-01 2023-06-20 2023-06-22 2023-08-10 2023-09-21 2023-10-19 2023-11-16 2023-12-14 2024-10-13 Based Selection l works to Connect to Zahle an on d to Aitanit Wastewater Treat ment Plants INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual QC1C2 / Design of sewage n Component 1: Improvement IBRD / 86370 Post Direct Selection Direct 392,500.00 Signed 2017-03-22 2017-03-22 2017-06-30 2017-06-29 2017-09-03 2017-10-09 2018-07-04 etwork to connect to the Anja of Municipal Sewage Collecti r WWTP on Component 3. Solid Waste M QC3C5A / Administration Offi anagement, Water Quality M Individual Consult IBRD / 86370 Prior Direct 253,304.25 Signed 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-07-01 2016-07-01 2017-06-30 cer– BWE onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M anagement, Water Quality M Individual Consult QC3C5B / Assistant– BWE IBRD / 86370 Post Direct 37,479.72 Completed 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-06-13 2016-07-01 2016-07-01 2017-06-30 2019-06-30 onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C9 / Solid waste expert - anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 132,000.00 Signed 2016-11-14 2016-11-14 2017-03-23 2017-03-23 2017-03-23 2017-03-23 2017-06-06 2017-06-06 2018-05-04 MOE onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C10 / Project manageme anagement, Water Quality M Individual Consult IBRD / 86370 Prior Open 277,860.00 Signed 2015-08-06 2015-08-06 2015-11-25 2015-11-25 2015-11-25 2015-11-25 2017-07-06 2016-11-01 2018-06-04 nt– CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C4 / Wastewater engine anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 0.00 Canceled 2016-12-28 2016-12-28 2017-06-30 2017-06-09 2017-07-15 2017-09-03 2018-08-02 er - BWE onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C7 / Financial officer - B anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 0.00 Canceled 2016-12-28 2017-06-08 2017-07-08 2017-08-12 2018-07-11 WE onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C7A / Financial Officer - anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 167,200.00 Signed 2017-08-02 2017-08-02 2017-11-13 2017-11-13 2017-11-23 2017-11-23 2018-02-06 2018-02-01 2019-01-05 BWE onitoring, Capacity Building ant Selection and Project Management QC1C5 / ESMP/LAP Anjar and Component 1: Improvement IBRD / 86370 Post Direct Selection Direct 66,383.00 Signed 2017-04-21 2017-04-21 2017-06-05 2017-05-01 2017-09-07 2017-09-29 2018-05-05 Aitanit of Municipal Sewage Collecti on Component 3. Solid Waste M QC3C11A / Financial Officer - anagement, Water Quality M Individual Consult IBRD / 86370 Prior Direct 201,153.59 Signed 2017-09-13 2017-09-13 2017-09-13 2017-09-13 2017-09-13 2017-11-03 2017-11-19 2018-10-02 CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C11B / Procurement Offi anagement, Water Quality M Individual Consult IBRD / 86370 Prior Open 153,054.00 Signed 2017-12-14 2017-12-14 2018-03-14 2018-04-30 2018-04-04 2018-07-02 2018-06-18 2018-07-05 2019-05-19 cer onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C1 / Lower Litani Enviro anagement, Water Quality M nment and Investment Plan - IBRD / 86370 Post Direct Selection Direct 196,000.00 Completed 2017-05-04 2017-05-04 2017-09-05 2017-09-05 2018-01-19 2018-02-12 2019-01-14 2019-03-15 onitoring, Capacity Building MoE and Project Management QC1C4A / Design of sewage Component 1: Improvement IBRD / 86370 Post Direct Selection Direct 17,560.00 Completed 2018-05-10 2018-05-10 2018-04-12 2018-11-07 2018-11-07 2018-12-07 2018-12-06 network to connect to the Ait of Municipal Sewage Collecti anit WWTP on Page 2 Component 3. Solid Waste M QC3C6B / Individual Consult anagement, Water Quality M Individual Consult ant Wastewater Sector - MOE IBRD / 86370 Post Open 0.00 Canceled 2018-06-10 2019-04-10 2019-06-07 2020-02-20 2019-06-28 2019-08-16 2020-07-15 onitoring, Capacity Building ant Selection W and Project Management Component 3. Solid Waste M QC3C11C / Environmental a anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 111,840.00 Signed 2018-06-10 2018-05-22 2018-10-11 2018-08-16 2018-10-25 2018-12-26 2018-12-26 2018-12-26 2019-09-30 nd Social Officer - CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C11D / Project Engineer anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 109,120.00 Signed 2018-11-30 2018-11-30 2019-06-07 2019-09-17 2019-06-28 2019-09-19 2019-08-16 2019-11-27 2020-07-15 - CDR onitoring, Capacity Building ant Selection and Project Management QC1C4 / Supervision of sewa Component 1: Improvement ge network to connect to the IBRD / 86370 of Municipal Sewage Collecti Post Direct Selection Direct 0.00 Canceled 2018-04-16 2018-05-06 2018-08-19 2020-12-11 Aitanit WWTP on QC3C13 / Consultancy Servi Component 3. Solid Waste M ces for the Preparation of a F anagement, Water Quality M IBRD / 86370 Post Direct Selection Direct 104,294.80 Signed 2019-01-08 2020-01-24 2019-10-01 2020-01-22 2019-12-31 2020-08-26 2020-05-30 easibility Study for Sustainab onitoring, Capacity Building le Sludge Management in the and Project Management Bekaa Region Component 3. Solid Waste M QC3C6A / Focal Point - MoE anagement, Water Quality M IBRD / 86370 Post Direct Selection Direct 136,400.00 Signed 2019-07-17 2019-07-30 2019-07-30 2019-07-25 2019-10-01 2020-03-07 2020-08-31 W onitoring, Capacity Building and Project Management Component 3. Solid Waste M QC3C11E / Rockwise PMIS S anagement, Water Quality M IBRD / 86370 Post Direct Selection Direct 30,746.25 Signed 2020-01-01 2020-01-17 2020-01-21 2020-01-21 2020-03-10 2020-03-11 2020-12-31 oftware Maintenance - CDR onitoring, Capacity Building and Project Management QC3C6C / Updating the Strat Component 3. Solid Waste M egic Environmental and Soci anagement, Water Quality M IBRD / 86370 Post Direct Selection Direct 99,973.00 Signed 2020-12-10 2021-01-28 2020-12-24 2021-03-17 2021-03-04 2021-09-24 2021-12-03 al Assessment (SESA) of the onitoring, Capacity Building Updated National Water Sect and Project Management or Strategy - MoEW Component 3. Solid Waste M QC3C11F / Environmental an anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 28,600.00 Signed 2020-12-10 2020-12-01 2021-02-04 2021-07-08 2021-02-18 2021-09-03 2021-04-01 2021-09-04 2022-02-28 d Social Officer - CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C9A / Solid Waste Exper anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 42,900.00 Signed 2020-12-10 2020-12-01 2021-02-04 2021-03-01 2021-02-18 2021-03-11 2021-04-01 2021-05-18 2022-02-28 t - MoE onitoring, Capacity Building ant Selection and Project Management QC1C1A / Design of Remaini Component 1: Improvement ng Works related to Expansio IBRD / 86370 of Municipal Sewage Collecti Post Direct Selection Direct 0.00 Signed 2022-01-24 2022-02-07 2022-02-14 2022-04-14 2022-04-25 2022-06-20 n of Sewage Network to Conn on ect to Zahlé Wastewater Tre atment Plant Project Component 3. Solid Waste M QC3C9A' / Solid Waste Exper anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 0.00 Canceled 2022-02-24 2022-03-30 2022-04-21 2022-07-05 2022-05-05 2022-06-16 2023-05-15 t - MoE onitoring, Capacity Building ant Selection and Project Management QC1C6 / Supervision of Zahl Component 1: Improvement é Wastewater Treatment Pla Under Implement IBRD / 86370 of Municipal Sewage Collecti Post Direct Selection Direct 0.00 2022-05-26 2022-07-18 2022-06-02 2022-07-28 2022-07-21 2022-08-31 nt Operation and Maintenanc ation on e, and Temporary Sludge Dis posal Facility Component 3. Solid Waste M QC3C11G / Environmental a anagement, Water Quality M Individual Consult IBRD / 86370 Post Open 0.00 Signed 2022-06-30 2022-07-06 2022-08-25 2022-09-01 2022-09-08 2022-09-13 2022-10-01 2023-08-31 nd Social Consultant - CDR onitoring, Capacity Building ant Selection and Project Management Component 3. Solid Waste M QC3C9B / Environmental an anagement, Water Quality M Individual Consult Open - Internationa Under Implement d Solid Waste Management E IBRD / 86370 Post 0.00 2022-12-15 2022-11-16 2023-01-11 2023-01-18 2023-02-01 2023-06-30 onitoring, Capacity Building ant Selection l ation xpert and Project Management Component 3. Solid Waste M QC3C2A / Technical Consult anagement, Water Quality M Individual Consult Open - Internationa Under Implement ant for Litani River Authority IBRD / 86370 Post 0.00 2022-12-15 2022-11-23 2023-01-25 2023-02-08 2023-03-01 2023-06-30 onitoring, Capacity Building ant Selection l ation (LRA) and Project Management Page 3 REPUBLIQUE DU TCHAD UNITE – TRAVAIL – PROGRES PRESIDENCE DE LA REPUBLIQUE MINISTER DE L’ELEVAGE ET DES PRODUCTIONS ANIMALES DEIRECTION GENERALE DU MINISTERE Projet Régional d’Appui au Pastoralisme au Sahel (PRAPS) Coordination Nationale PROJET DE PLAN DE PASSATION DES MARCHES (PPM) SIMPLIFIE PPA PRAPS 2 Information sur le Projet : République du Tchad Nom du Projet : Projet Régional d’Appui au Pastoralisme au Sahel (PRAPS) Tchad 2 No d’identification du projet : P173197 Agence d’exécution du Projet : Unité de Coordination du Projet (UCP). Date du plan de passation des marchés : juillet 2020 Période couverte par ce plan de passation des marchés : 12 mois Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016 révisé en septembre 2017 et août 2018 ) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le Décret No 2417/PR/PM/2015 du 17 Décembre 2015 portant Code des Marches Publics au Tchad, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : a) Les entreprises éligibles de tout pays peuvent concourir ; b) Le dossier d’appel d’offres/a propositions oblige le Soumissionnaire/Proposant présentant une Offre/Proposition à déposer un agreement signe, qui sera joint à tout contrat éventuel, pour confirmer qu’il applique et respecte les Directives de la Banque pour la lutte contre la corruption, y compris sans limitation, le droit de la Banque de sanctionner et les droits de la Banque pour l’inspection et l’audit ; c) les documents de passation des marchés contiennent des dispositions convenues avec la Banque, destinées à atténuer les risques et impacts environnementaux, sociaux (y compris l’exploitation et les abus sexuels et les violences à caractère sexiste), et sur l’hygiène et la sécurité (« ESHS ») d) Les marchés doivent comporter une répartition appropriée des attributions, risques et responsabilités ; e) La publication des informations relatives à l’attribution du marché ; f) Le droit de la Banque d’examiner le dossier et les activités de passation des marchés ; g) L’existence d’un mécanisme efficace d’examen des plaintes ; et h) La gestion et l’archivage des dossiers relatifs au Processus de passation des marchés. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés : « Sans objet ». Achat de biens d’occasion tel que spécifié au paragraphe 5.11du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet ». Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas Travaux ne s’applique pas Autres informations pertinentes sur la passation des marchés : « Sans Objet » Les seuils pour les méthodes de passation des marchés : Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : TRAVAUX (US$ équivalent) FOURNITURES (US$ équivalent) Appel d’offres Ouvert Demand Appel d’Offres Ouvert Demande e de de Cotation Internatio Cotations International National National s nal <10.000.00 <200,000 ≥ < 100,000 ≥10,000.000 <1.000.000 0 1.000.000 Les seuils pour la revue préalable par la Banque mondiale Estimation des coûts en millions de dollars américains Type de marches Faible Modéré Substantiel Elevé Travaux 5.0 10.0 15.0 20.0 Fournitures et équipements 1.5 2.0 4.0 6.0 Consultants (firmes) 0.5 1.0 2.0 4.0 Consultant individuel 0.2 0.3 0.4 0.5 Liste des Consultations, avec les méthodes de sélection et le calendrier de mise œuvre 1 2 3 4 5 6 7 N# Descriptions des Cout Méthode Revue par Date Observations Ref activites Projet de la Banque prévue de Date de fin (US$) Sélection l’ouverture des des plis prestations Recrutement d’un consultant pour A 12/08/202 30/09/202 1 41 391 CI l’élaboration de cadre de posteriori 0 0 Gestion Environnementale Recrutement d’un consultant pour A 12/08/202 30/09/202 2 41 391 CI l’élaboration de cadre de posteriori 0 0 Gestion Sociale Recrutement d’un consultant principal pour la A 12/08/202 30/09/202 3 coordination et contrôle 41 391 CI posteriori 0 0 de qualité des instruments et la réalisation de l’ESCP 116 Recrutement d’un bureau 30/09/202 A 30/4/2021 4 pour la sélection du 16 556 SQC 030/5/202 posteriori 5562/08/2 personnel du Projet 1 020 Total III 140 729 TOTAL GENERAL 140729 Lexique des Sigles et Abréviations AOI : Appel d’Offres Ouvert International SFQC : Sélection Fondée sur la Qualité et le Coût AON : Appel d’Offres Ouvert National QC : Sélection fondée sur les Qualifications des Consultants CF : Consultation des Fournisseurs SFQ : Sélection Fondée sur la Qualité ED : Entente Directe (Gré à Gré) SMC : Sélection au Moindre Coût A posteriori : Revue à posteriori CI : Consultant Individuel A Priori : Revue à priori SED : Sélection par Entente Directe PROCUREMENT Western and Central Africa : Regional Sahel Pastoralism Support Project II PLAN General Information Country: Western and Central Africa 2022-02-25 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173197 GPN Date: 2022-02-24 Project Name: Regional Sahel Pastoralism Support Project II Loan / Credit No: IDA / D7990, IDA / 68610 Regional Sahel Pastoralism Support Project - Mali Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure ML-PRAPS-ML-269135-CW-R Project coordination, instituti ment Document - Request for Quota Single Stage - One E 2022-06-2 FQ / Travaux de réhabilitatio IDA / D7990 onal strengthening, crisis pr Post Limited 1 Envelope proce 54,000.00 0.00 Signed 2022-01-29 2022-12-23 2022-03-26 tions nvelope 4 n/ entretien des locaux UCP evention and response ss (Non Bank-SPD ) National Procure ML-PRAPS-ML-272133-CW-R Animal health improvement ment Document - FQ / Construction de latrines Request for Quota Single Stage - One E Pending Imp 2023-02-1 IDA / D7990 and veterinary medicine con Post Limited 1 Envelope proce 74,000.00 0.00 2022-06-20 2022-08-15 dans 21 parcs de vaccination tions nvelope lementation 1 trol ss (Non Bank-SPD dans la région de Kayes ) National Procure ML-PRAPS-ML-272134-CW-R Animal health improvement ment Document - FQ / Construction de latrines Request for Quota Single Stage - One E Pending Imp 2023-02-1 IDA / D7990 and veterinary medicine con Post Limited 1 Envelope proce 35,000.00 0.00 2022-06-20 2022-08-15 dans 10 parcs de vaccination tions nvelope lementation 1 trol ss (Non Bank-SPD dans les régions Koulikoro et ) Sikasso National Procure ML-PRAPS-ML-272137-CW-R Animal health improvement ment Document - FQ / Construction de latrines Request for Quota Single Stage - One E Under Imple 2023-02-1 IDA / D7990 and veterinary medicine con Post Limited 1 Envelope proce 53,000.00 0.00 2022-06-20 2023-01-04 2022-08-15 dans 15 parcs de vaccination tions nvelope mentation 1 trol ss (Non Bank-SPD dans la région de Mopti ) National Procure ML-PRAPS-ML-272138-CW-R Animal health improvement ment Document - FQ / Construction de latrines Request for Quota Single Stage - One E 2023-02-1 IDA / D7990 and veterinary medicine con Post Limited 1 Envelope proce 50,000.00 0.00 Signed 2022-06-20 2022-12-23 2022-08-15 dans 14 parcs de vaccination tions nvelope 1 trol ss (Non Bank-SPD dans les régions de Tombouc ) tou, Gao et Ménaka National Procure ML-PRAPS-ML-282105-CW-R Project coordination, instituti ment Document - Single Stage - One E Pending Imp 2023-05-1 FB / Construction de magasin IDA / D7990 onal strengthening, crisis pr Post Request for Bids Open - National 1 Envelope proce 435,000.00 0.00 2022-07-27 2022-08-01 2022-09-12 2022-10-12 2022-11-16 nvelope lementation 5 s d’aliment bétail evention and response ss (Non Bank-SPD ) ML-PRAPS-ML-287074-CW-R FQ / Travaux d’équipement d e 03 forages en Systèmes d’ Sustainable landscape mana Request for Quota Hydraulique Pastorale Amélio Request for Quota Single Stage - One E 2022-12-1 IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 181,000.00 0.00 Signed 2022-04-25 2022-07-19 2022-06-20 rés (SHPA) dans les périmètr tions nvelope 7 ancement PD) es pastoraux de Dendedji et Rangabé, dans le gite d’étap es de Boundouboubou à Nam palary (Cercle de Niono) ML-PRAPS-ML-287075-CW-R FQ / Travaux d’équipement d e 03 forages en Systèmes d’ Sustainable landscape mana Request for Quota Request for Quota Single Stage - One E 2022-12-1 Hydraulique Pastorale Amélio IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 157,000.00 0.00 Signed 2022-04-25 2022-07-19 2022-06-20 tions nvelope 7 rés (SHPA) dans les gites d’ét ancement PD) apes de Monimpébougou , Sa ma et Togual Missidi (régions de Ségou et Mopti) ML-PRAPS-ML-287073-CW-R FQ / Travaux d’équipement d e 03 forages en Systèmes d’ Sustainable landscape mana Request for Quota Request for Quota Single Stage - One E 2022-12-1 Hydraulique Pastorale Amélio IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 157,000.00 0.00 Signed 2022-04-25 2022-07-19 2022-06-20 tions nvelope 7 rés (SHPA) dans les gites d’ét ancement PD) apes de Sissa, Belkoye et Kro un (commune de Ouenkoro, cercle de Bankass, région de Mopti). ML-PRAPS-ML-287076-CW-R FQ / Travaux d’équipement d Sustainable landscape mana Request for Quota e 02 forages en Systèmes d’ Request for Quota Single Stage - One E 2022-12-1 IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 104,000.00 0.00 Signed 2022-04-25 2022-07-19 2022-06-20 Hydraulique Pastorale Amélio tions nvelope 7 ancement PD) rés (SHPA) dans les gites d’ét apes de Soubala et de Goudo um dans la région de Mopti ML-PRAPS-ML-287095-CW-R FQ / Travaux d’équipement d e 04 forages en Systèmes d’ Sustainable landscape mana Request for Quota Request for Quota Single Stage - One E 2022-12-1 Hydraulique Pastorale Amélio IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 174,000.00 0.00 Signed 2022-04-25 2022-07-19 2022-06-20 tions nvelope 7 rés (SHPA) dans les gites d’ét ancement PD) apes de Menamba 2, Diakoro , Séguindara et Balanzani 2 r égions de Sikasso et Ségou ML-PRAPS-ML-340472-CW-R Request for Bids - Animal health improvement FB / Construction des directio Single Stage - One E Small Works SPD Pending Imp 2024-07-2 IDA / D7990 and veterinary medicine con Post Request for Bids Open - National 348,000.00 0.00 2023-10-10 2023-10-15 2023-11-26 2023-12-26 2024-01-30 ns régionales des services vé nvelope (1 envelope proce lementation 8 trol térinaires de Koutiala et de N ss) ioro du Sahel ML-PRAPS-ML-340476-CW-R Sustainable landscape mana Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-02-0 FQ / Réhabilitation de 100 K IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 27,000.00 0.00 2023-06-10 2023-08-05 tions nvelope lementation 1 m de piste à bétail ancement PD) ML-PRAPS-ML-340477-CW-R Sustainable landscape mana Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-03-1 FQ / Réalisation de 100 Km d IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 70,000.00 0.00 2023-07-22 2023-09-16 tions nvelope lementation 4 e piste à bétail ancement PD) ML-PRAPS-ML-340478-CW-R Sustainable landscape mana Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-03-0 FQ / Réalisation/réhabilitation IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 174,000.00 0.00 2023-07-12 2023-09-06 tions nvelope lementation 4 de 4 périmètres pastoraux ancement PD) Request for Bids - ML-PRAPS-ML-340479-CW-R Sustainable landscape mana Single Stage - One E Small Works SPD Pending Imp 2024-06-1 FB / Réalisation de 5 forages IDA / D7990 gement and governance enh Post Request for Bids Open - National 267,800.00 0.00 2023-08-30 2023-09-04 2023-10-16 2023-11-15 2023-12-20 nvelope (1 envelope proce lementation 7 équipés de SHPA ancement ss) Request for Bids - ML-PRAPS-ML-340483-CW-R Sustainable landscape mana Single Stage - One E Small Works SPD Pending Imp 2024-08-1 FB / Réalisation de 15 forage IDA / D7990 gement and governance enh Post Request for Bids Open - National 978,000.00 0.00 2023-10-31 2023-11-05 2023-12-17 2024-01-16 2024-02-20 nvelope (1 envelope proce lementation 8 s équipés de mini SHPA ancement ss) Page 1 ML-PRAPS-ML-340487-CW-R Sustainable landscape mana Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-11-2 FQ / Réalisation de 2 retenue IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 74,500.00 0.00 2023-04-04 2023-05-30 tions nvelope lementation 6 s d'eau ancement PD) ML-PRAPS-ML-340488-CW-R Sustainable landscape mana Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-11-1 FQ / Construction de 5 maga IDA / D7990 gement and governance enh Post Limited tions (Non Bank-S 56,000.00 0.00 2023-03-20 2023-05-15 tions nvelope lementation 1 sins et de hangars de stocka ancement PD) ge de fourrage ML-PRAPS-ML-340489-CW-R Request for Bids - FB / Construction du marché Livestock value chain impro Single Stage - One E Small Works SPD Pending Imp 2024-07-2 à Bétail de Gunanour, Comm IDA / D7990 Post Request for Bids Open - National 210,000.00 0.00 2023-10-10 2023-10-15 2023-11-26 2023-12-26 2024-01-30 vement nvelope (1 envelope proce lementation 8 unes de Dionguala Cercle de ss) Yélimané Région de Kayes ML-PRAPS-ML-340490-CW-R FB / Réhabilitation des march Request for Bids - és à Bétail de Sikasso et Nién Livestock value chain impro Single Stage - One E Small Works SPD Pending Imp 2024-07-1 IDA / D7990 Post Request for Bids Open - National 461,000.00 0.00 2023-09-25 2023-09-30 2023-11-11 2023-12-11 2024-01-15 a, Construction d’une aire d’ vement nvelope (1 envelope proce lementation 3 abattage à Niéna et un Etal d ss) e boucherie à Sikasso (Régio n de Sikasso) ML-PRAPS-ML-340491-CW-R FB / Réhabilitation du march Request for Bids - é à Bétail de San, constructio Livestock value chain impro Single Stage - One E Small Works SPD Pending Imp 2024-07-1 IDA / D7990 Post Request for Bids Open - National 417,000.00 0.00 2023-09-26 2023-10-01 2023-11-12 2023-12-12 2024-01-16 n des aires d’abattage de Sa vement nvelope (1 envelope proce lementation 4 n et Baraouéli et constructio ss) n de l’Etal de boucherie de K onobougou, région de Ségou ML-PRAPS-ML-340492-CW-R FB / Réhabilitation du march Request for Bids - é à Bétail de Fatoma, constru Livestock value chain impro Single Stage - One E Small Works SPD Pending Imp 2024-07-2 IDA / D7990 Post Request for Bids Open - National 305,000.00 0.00 2023-10-10 2023-10-15 2023-11-26 2023-12-26 2024-01-30 ction de l’aire d’abattage de vement nvelope (1 envelope proce lementation 8 Fakala, Cercle de Djénné, co ss) nstruction de l’étal de bouch erie de Fatoma (région de Mo pti) ML-PRAPS-ML-340494-CW-R Request for Bids - FB / Construction du marché Livestock value chain impro Single Stage - One E Small Works SPD Pending Imp 2024-07-2 IDA / D7990 Post Request for Bids Open - National 209,000.00 0.00 2023-10-10 2023-10-15 2023-11-26 2023-12-26 2024-01-30 à bétail de Zouéra, Cercle de vement nvelope (1 envelope proce lementation 8 Goundam, région de Tombou ss) ctou ML-PRAPS-ML-340495-CW-R Request for Quota Livestock value chain impro Request for Quota Single Stage - One E Pending Imp 2024-06-1 FQ / Construction d’une aire IDA / D7990 Post Limited tions (Non Bank-S 113,000.00 0.00 2023-10-22 2023-12-17 vement tions nvelope lementation 4 d’abattage à Kidal PD) ML-PRAPS-ML-340497-CW-R Request for Quota FQ / Construction de 2 étals Livestock value chain impro Request for Quota Single Stage - One E Pending Imp 2024-05-2 IDA / D7990 Post Limited tions (Non Bank-S 70,000.00 0.00 2023-10-01 2023-11-26 de boucherie à Sirakoro et Ka vement tions nvelope lementation 4 PD) ngaba (région de Koulikoro) ML-PRAPS-ML-340499-CW-R Request for Bids - Project coordination, instituti FB / Construction de 20 mag Single Stage - One E Small Works SPD Pending Imp 2024-03-1 IDA / D7990 onal strengthening, crisis pr Post Request for Bids Open - National 870,000.00 0.00 2023-05-31 2023-06-05 2023-07-17 2023-08-16 2023-09-20 asins d’aliment bétail dans le nvelope (1 envelope proce lementation 8 evention and response cadre d’un partenariat public ss) -privé ML-PRAPS-ML-340500-CW-R FB / Construction de 7 postes Request for Bids - Animal health improvement frontaliers et postes vétérinai Single Stage - One E Small Works SPD Pending Imp 2024-07-2 IDA / D7990 and veterinary medicine con Post Request for Bids Open - National 320,000.00 0.00 2023-10-10 2023-10-15 2023-11-26 2023-12-26 2024-01-30 res, Réhabilitation de 5 poste nvelope (1 envelope proce lementation 8 trol s frontaliers et postes vétérin ss) aires et Réhabilitation des 5 secteurs vétérinaires Request for Bids - ML-PRAPS-ML-340501-CW-R Animal health improvement Single Stage - One E Small Works SPD Pending Imp 2024-08-1 FB / Construction de 8 parcs IDA / D7990 and veterinary medicine con Post Request for Bids Open - National 210,000.00 0.00 2023-10-31 2023-11-05 2023-12-17 2024-01-16 2024-02-20 nvelope (1 envelope proce lementation 8 de vaccination trol ss) ML-PRAPS-ML-340482-CW-R Sustainable landscape mana Request for Quota Single Stage - One E Other (with field f Pending Imp 2024-03-2 FQ / Surcreusement de 2 mar IDA / D7990 gement and governance enh Post Limited 167,700.00 0.00 2023-08-01 2023-09-26 tions nvelope or explanation) lementation 4 es ancement GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRAPS-ML-271171-GO-RF Animal health improvement Request for Quota Single Stage - One E Q / Acquisition de 06 pinasse IDA / D7990 and veterinary medicine con Post Limited 52,000.00 0.00 Signed 2022-02-20 2022-07-21 2022-04-17 2022-10-14 tions nvelope s au compte du PRAPS-ML II trol ML-PRAPS-ML-271643-GO-RF Animal health improvement Single Stage - One E Under Imple B / Acquisition de 50 trousses IDA / D7990 and veterinary medicine con Post Request for Bids Open - National 105,000.00 0.00 2022-02-24 2022-05-13 2022-03-01 2022-11-02 2022-04-12 2022-06-30 2022-05-12 2022-07-20 2022-06-16 2022-09-14 nvelope mentation vétérinaires trol ML-PRAPS-ML-271319-GO-RF Animal health improvement Request for Quota Single Stage - One E Q / Acquisition de matériel d IDA / D7990 and veterinary medicine con Post Limited 26,000.00 0.00 Canceled 2022-02-27 2022-04-24 2022-06-23 tions nvelope e laboratoire pour le LCV, LV trol G et LVK ML-PRAPS-ML-271653-GO-RF Q / Acquisition de matériels d Animal health improvement Request for Quota Single Stage - One E Pending Impl e conservation et de stockag IDA / D7990 and veterinary medicine con Post Limited 50,000.00 0.00 2022-02-22 2022-04-19 2022-08-17 tions nvelope ementation e du laboratoire de Mycoplas trol mes du LCV (Bamako et Gao) ML-PRAPS-ML-271656-GO-RF Q / Acquisition de semences Sustainable landscape mana pour la Restauration/gestion Request for Quota Single Stage - One E IDA / D7990 gement and governance enh Post Limited 61,000.00 0.00 Canceled 2022-04-25 2022-06-20 2022-10-18 de 1 000 ha de bourgoutière tions nvelope ancement et la Récupération de 1000 h a de pâturages dégradés ave c des techniques simples ML-PRAPS-ML-271657-GO-RF Q / Acquisition de petits Maté Sustainable landscape mana Request for Quota Single Stage - One E riels pour renforcer la collect IDA / D7990 gement and governance enh Post Limited 17,500.00 0.00 Signed 2022-02-05 2022-08-05 2022-04-02 2022-07-31 tions nvelope e des données pour le suivi d ancement es ressources pastorales ML-PRAPS-ML-271658-GO-RF Q / Acquisition d'équipement s solaires pour le fonctionne Livestock value chain impro Request for Quota Single Stage - One E Pending Impl IDA / D7990 Post Limited 9,000.00 0.00 2022-02-21 2022-04-18 2022-07-17 ment du serveur (Un lot de 5 vement tions nvelope ementation panneaux solaires et batterie s, acquis pour le serveur de l a DNPIA) Page 2 ML-PRAPS-ML-271796-GO-RF B / Acquisition de 60 équipe Livestock value chain impro Single Stage - One E IDA / D7990 Post Request for Bids Open - National 104,000.00 0.00 Canceled 2022-02-16 2022-02-21 2022-04-04 2022-05-04 2022-06-08 2022-09-06 ments et petits matériels pou vement nvelope r la collecte de l’information ML-PRAPS-ML-271805-GO-RF Q / Acquisition d’équipement Livestock value chain impro Request for Quota Single Stage - One E Pending Impl IDA / D7990 Post Limited 52,000.00 0.00 2022-03-02 2022-04-27 2022-07-26 s pour la mise en œuvre de l vement tions nvelope ementation a finance numérique ML-PRAPS-ML-271827-GO-RF Project coordination, instituti Request for Quota Single Stage - One E Q / Acquisition de climatiseur IDA / D7990 onal strengthening, crisis pr Post Limited 30,000.00 0.00 Signed 2022-02-27 2022-08-02 2022-04-24 2022-06-23 tions nvelope s evention and response ML-PRAPS-ML-271829-GO-RF Project coordination, instituti Request for Quota Single Stage - One E Q / Acquisition de groupe éle IDA / D7990 onal strengthening, crisis pr Post Limited 30,000.00 0.00 Signed 2022-02-27 2022-07-21 2022-04-24 2022-06-23 tions nvelope ctrogène evention and response ML-PRAPS-ML-271832-GO-RF Project coordination, instituti Single Stage - One E Under Imple B / Acquisition d'aliment béta IDA / D7990 onal strengthening, crisis pr Post Request for Bids Open - National 104,000.00 0.00 2022-03-22 2022-03-25 2022-03-29 2022-04-08 2022-05-10 2022-05-11 2022-06-09 2022-05-11 2022-07-14 2022-11-11 nvelope mentation il pour les magasins (stock ini evention and response tial) ML-PRAPS-ML-282106-GO-RF Animal health improvement Under Imple B / Acquisition de motos au c IDA / D7990 and veterinary medicine con Post Request for Bids 200,000.00 0.00 2022-03-23 2022-05-23 2022-03-28 2022-06-30 2022-05-09 2022-06-08 2022-07-13 2022-11-10 mentation ompte du PRAPS-ML II trol ML-PRAPS-ML-282110-GO-RF Animal health improvement Single Stage - One E Under Imple B / Acquisition des matériels i IDA / D7990 and veterinary medicine con Post Request for Bids Open - National 380,000.00 0.00 2022-02-23 2022-06-27 2022-02-28 2022-06-27 2022-04-11 2022-07-20 2022-05-11 2022-09-06 2022-06-15 2022-10-13 nvelope mentation nformatiques et bureautique trol s ML-PRAPS-ML-282439-GO-RF Animal health improvement Single Stage - One E B / Acquisition de véhicules a IDA / D7990 and veterinary medicine con Post Request for Bids Open - National 817,000.00 0.00 Signed 2022-04-18 2022-03-25 2022-04-23 2022-04-08 2022-06-04 2022-05-10 2022-07-04 2022-06-16 2022-08-08 2023-02-04 nvelope u compte du PRAPS-ML II trol ML-PRAPS-ML-283636-GO-RF B / Acquisition de 60 équipe Livestock value chain impro Single Stage - One E IDA / D7990 Post Request for Bids Open - National 104,000.00 0.00 Signed 2022-04-06 2022-06-27 2022-04-11 2022-06-27 2022-05-23 2022-07-26 2022-06-22 2022-08-11 2022-07-27 2022-10-25 ments et petits matériels pou vement nvelope r la collecte de l’information ML-PRAPS-ML-291955-GO-RF Q / Production de supports d Project coordination, instituti e communication : agendas, Request for Quota Single Stage - One E IDA / D7990 onal strengthening, crisis pr Post Limited 26,000.00 0.00 Signed 2022-08-02 2022-09-29 2022-09-27 2023-03-26 calendriers, bloc-notes, dépli tions nvelope evention and response ants, Tee shorts, casquettes, auto collants, porte-clés, clés USB, cartables ML-PRAPS-ML-271320-GO-RF Animal health improvement Request for Quota Single Stage - One E Q / Acquisition de 1000 pince IDA / D7990 and veterinary medicine con Post Limited 53,000.00 0.00 Signed 2022-08-08 2022-08-03 2022-10-03 2022-12-02 tions nvelope s à encoche pour marquage trol des animaux ML-PRAPS-ML-311361-GO-RF Q / Acquisition de 140 smart Animal health improvement Request for Quota Single Stage - One E phones pour la C1 et le Suivi- IDA / D7990 and veterinary medicine con Post Limited 40,000.00 0.00 Signed 2022-09-05 2022-10-27 2022-10-31 2022-12-30 tions nvelope évaluation (collecte des donn trol ées par KOBOTOOLBOX). ML-PRAPS-ML-307812-GO-RF Animal health improvement B / Acquisition de matériels d Single Stage - One E Under Imple IDA / D7990 and veterinary medicine con Post Request for Bids Open - National 210,000.00 0.00 2022-02-14 2022-04-14 2022-02-19 2022-11-03 2022-04-02 2022-06-29 2022-05-02 2022-06-06 2022-10-04 e froid au compte du PRAPS- nvelope mentation trol ML II (60 congélateurs solaire s, 60 glacières) ML-PRAPS-ML-271642-GO-DI R / Acquisition de 5 500 000 Animal health improvement Single Stage - One E Under Imple de doses de vaccins contre la IDA / D7990 and veterinary medicine con Post Direct Selection Open - National 521,740.00 0.00 2022-10-27 2022-01-06 2022-10-28 2022-08-16 2022-11-14 2022-11-29 nvelope mentation PPR et 4 500 000 de doses d trol e vaccins contre la PPCB en 2 022 ML-PRAPS-ML-328669-GO-RF Animal health improvement Request for Quota Single Stage - One E Pending Impl Q / Acquisition de matériel d IDA / D7990 and veterinary medicine con Post Limited 26,000.00 0.00 2022-12-11 2023-02-05 2023-04-06 tions nvelope ementation e laboratoire pour le LCV, LV trol G et LVK ML-PRAPS-ML-340747-GO-RF Animal health improvement Request for Quota Single Stage - One E Pending Impl Q / Acquisition de matériel d IDA / D7990 and veterinary medicine con Post Limited 26,000.00 0.00 2023-03-08 2023-05-03 2023-07-02 tions nvelope ementation e laboratoire pour le LCV, LV trol G et LVK ML-PRAPS-ML-340748-GO-RF Sustainable landscape mana Request for Quota Single Stage - One E Pending Impl Q / Acquisition de petits mat IDA / D7990 gement and governance enh Post Limited 25,000.00 0.00 2023-08-30 2023-10-25 2024-02-22 tions nvelope ementation ériels d'ouverture des pare-fe ancement u ML-PRAPS-ML-340749-GO-RF Sustainable landscape mana Q / Acquisition de semence p Request for Quota Single Stage - One E Pending Impl IDA / D7990 gement and governance enh Post Limited 35,000.00 0.00 2023-04-01 2023-05-27 2023-09-24 our les travaux de restaurati tions nvelope ementation ancement on des bourgoutières et des zones exondées ML-PRAPS-ML-340750-GO-RF Q / Acquisition de semences Sustainable landscape mana Request for Quota Single Stage - One E Pending Impl de base pour la production s IDA / D7990 gement and governance enh Post Limited 5,500.00 0.00 2023-04-01 2023-05-27 2023-09-24 tions nvelope ementation emencière et de semences c ancement ertifiées pour la production d e fourrages ML-PRAPS-ML-340751-GO-RF Project coordination, instituti Request for Quota Single Stage - One E Q / Acquisition de 3 incinérat IDA / D7990 onal strengthening, crisis pr Post Limited 53,000.00 0.00 Signed 2023-07-31 2023-03-13 2023-09-25 2024-03-23 tions nvelope eurs pour les CSRéfs evention and response ML-PRAPS-ML-340754-GO-RF Project coordination, instituti Q / Acquisition des Equipeme Request for Quota Single Stage - One E Pending Impl IDA / D7990 onal strengthening, crisis pr Post Limited 42,000.00 0.00 2023-07-31 2023-09-25 2024-03-23 nts de protection individuelle tions nvelope ementation evention and response pour l’UCP et des sacs pour l es VTMS ML-PRAPS-ML-340770-GO-RF Sustainable landscape mana Request for Quota Single Stage - One E Q / Acquisition d’équipement IDA / D7990 gement and governance enh Post Limited 53,000.00 0.00 Canceled 2023-03-15 2023-05-10 2023-07-09 tions nvelope s de technologie numérique ancement pour la C2 ML-PRAPS-ML-340756-GO-RF Q / Acquisition de 100 Kits d’I Social and economic inclusio Request for Quota Single Stage - One E Pending Impl nsertion post formation profe IDA / D7990 n improvement, women and Post Limited 54,000.00 0.00 2023-06-20 2023-08-15 2024-02-11 tions nvelope ementation ssionnelle des jeunes et les f youth emmes issues du milieu past oral (centre d’incubation) ML-PRAPS-ML-340762-GO-RF Livestock value chain impro Request for Quota Single Stage - One E Q / Acquisition d’Equipement IDA / D7990 Post Limited 26,000.00 0.00 Signed 2023-03-25 2023-04-05 2023-05-20 2023-08-18 vement tions nvelope s informatiques pour les O.P. Page 3 ML-PRAPS-ML-340772-GO-RF Livestock value chain impro Request for Quota Single Stage - One E Pending Impl Q / Acquisition d’Equipement IDA / D7990 Post Limited 52,000.00 0.00 2023-03-25 2023-05-20 2023-07-19 vement tions nvelope ementation s de finance numérique (mob ile money) C3 ML-PRAPS-ML-271816-GO-RF Project coordination, instituti Request for Quota Single Stage - One E Q / Acquisition d'équipement IDA / D7990 onal strengthening, crisis pr Post Limited 87,000.00 0.00 Canceled 2022-03-27 2022-05-22 2022-08-20 tions nvelope de communication evention and response ML-PRAPS-ML-340778-GO-RF Q / Acquisition d'équipement Project coordination, instituti Request for Quota Single Stage - One E Pending Impl s de communication pour la f IDA / D7990 onal strengthening, crisis pr Post Limited 26,000.00 0.00 2023-09-10 2023-11-05 2024-01-04 tions nvelope ementation in d'année (calendriers, agen evention and response das, porte-clés, clés USB...) ML-PRAPS-ML-285095-GO-RF Sustainable landscape mana Q / Acquisition de 600 kg de Request for Quota Single Stage - One E IDA / D7990 gement and governance enh Post Limited 2,100.00 0.00 Canceled 2022-04-18 2022-06-13 2022-10-11 semences certifiées R1 pour l tions nvelope ancement a production de fourrages ML-PRAPS-ML-345125-GO-DI R / Acquisition de 42 000 000 Animal health improvement Under Imple doses de vaccins contre la PP IDA / D7990 and veterinary medicine con Prior Direct Selection 3,500,000.00 0.00 2023-03-20 2023-04-04 2023-03-25 2023-04-20 2023-04-29 2025-04-20 mentation R et de 23 000 000 doses de trol vaccins contre la PPCB ML-PRAPS-ML-340761-GO-RF Project coordination, instituti B / Acquisition de 300 Tonne Single Stage - One E IDA / D7990 onal strengthening, crisis pr Post Request for Bids Open - National 160,000.00 0.00 Canceled 2023-02-28 2023-03-07 2023-04-18 2023-05-18 2023-06-22 2023-10-20 s d'aliment bétail pour la dot nvelope evention and response ation des magasins en stock i nitial ML-PRAPS-ML-360344-GO-DI Project coordination, instituti R / Acquisition de 300 Tonne Pending Impl IDA / D7990 onal strengthening, crisis pr Post Direct Selection Direct - National 160,000.00 0.00 2023-04-19 2023-04-24 2023-05-29 2023-08-27 s d'aliment bétail pour la dot ementation evention and response ation des magasins en stock i nitial NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRAPS-ML-282118-NC-RF Q / Réalisation des campagn Project coordination, instituti Request for Quota Single Stage - One E Pending Impl es d’information et sensibilis IDA / D7990 onal strengthening, crisis pr Post Limited 9,000.00 0.00 2022-04-18 2022-06-13 2022-12-10 tions nvelope ementation ation des organisations de fe evention and response mmes et jeunes pour l’accès au foncier ML-PRAPS-ML-282117-NC-RF Livestock value chain impro Request for Propo Single Stage - Two E Pending Impl P / Diffusion des informations IDA / D7990 Post Limited 9,000.00 0.00 2022-04-20 2022-07-06 2022-07-06 2022-09-14 2022-11-27 2023-01-01 2024-06-24 vement sals nvelope ementation dans les radios de proximité ML-PRAPS-ML-285505-NC-RF Livestock value chain impro Request for Quota Single Stage - One E Pending Impl Q / Diffusion des information IDA / D7990 Post Limited 9,000.00 0.00 2022-04-25 2022-06-20 2022-12-17 vement tions nvelope ementation s dans les radios de proximit é ML-PRAPS-ML-290089-NC-RF Project coordination, instituti Request for Quota Single Stage - One E Pending Impl Q / Référencement du site w IDA / D7990 onal strengthening, crisis pr Post Limited 9,000.00 0.00 2022-06-20 2022-08-15 2023-02-11 tions nvelope ementation eb du PRAPS-II evention and response ML-PRAPS-ML-290100-NC-RF Project coordination, instituti Request for Quota Single Stage - One E Pending Impl Q / Réalisation de films docu IDA / D7990 onal strengthening, crisis pr Post Limited 12,000.00 0.00 2022-07-12 2022-09-06 2023-03-05 tions nvelope ementation mentaires sur les activités du evention and response PRAPS 2 ML-PRAPS-ML-295612-NC-DI Project coordination, instituti R / ACCOMPAGNEMENT, HER Pending Impl IDA / D7990 onal strengthening, crisis pr Post Direct Selection Direct 37,000.00 0.00 2022-06-15 2022-06-20 2022-07-25 2023-01-21 BERGEMENT ET MISE A JOUR ementation evention and response DES LOGICIELS TOM2Pro et T OM2Monitoring ML-PRAPS-ML-340765-NC-RF Project coordination, instituti Q / Elaborer et Diffuser les su Request for Quota Single Stage - One E Pending Impl IDA / D7990 onal strengthening, crisis pr Post Limited 9,000.00 0.00 2023-03-25 2023-05-20 2023-11-16 pports de communication (gu tions nvelope ementation evention and response ides pratiques, affiches, note s thématiques) ML-PRAPS-ML-340775-NC-RF Q / Réalisation des activités Project coordination, instituti Request for Quota Single Stage - One E Pending Impl de communication sur le proj IDA / D7990 onal strengthening, crisis pr Post Limited 26,000.00 0.00 2023-10-10 2023-12-05 2024-06-02 tions nvelope ementation et (dépliants, brochures, poin evention and response ts de presse, conférences, jo urnées porte ouverte) ML-PRAPS-ML-345128-NC-RF Project coordination, instituti Q / Acquisition du certificat p Request for Quota Single Stage - One E Pending Impl IDA / D7990 onal strengthening, crisis pr Post Limited 8,000.00 0.00 2023-05-27 2023-07-22 2024-01-18 our la sécurisation de la mes tions nvelope ementation evention and response sagerie du serveur KTB ML-PRAPS-ML-355556-NC-RF Project coordination, instituti Request for Quota Single Stage - One E Pending Impl Q / Réhabilitation du réseau i IDA / D7990 onal strengthening, crisis pr Post Limited 10,500.00 0.00 2023-04-25 2023-06-20 2023-09-18 tions nvelope ementation ntranet du PRAP 2-ML evention and response CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRAPS-ML-266495-CS-CQ Animal health improvement S / Réalisation des études tec Consultant Qualifi Pending Impleme IDA / D7990 and veterinary medicine con Post Open - National 17,500.00 0.00 2022-04-12 2022-05-03 2022-06-16 2022-07-16 2022-08-20 2023-02-16 hniques des infrastructures v cation Selection ntation trol étérinaires dans les régions d u Sud ML-PRAPS-ML-266500-CS-CQ Animal health improvement S / Réalisation des études tec Consultant Qualifi Pending Impleme IDA / D7990 and veterinary medicine con Post Open - National 17,500.00 0.00 2022-04-12 2022-05-03 2022-06-16 2022-07-16 2022-08-20 2023-02-16 hniques des infrastructures v cation Selection ntation trol étérinaires dans les régions d u Nord ML-PRAPS-ML-268828-CS-CQ Sustainable landscape mana S / Élaboration/actualisation Consultant Qualifi IDA / D7990 gement and governance enh Post Open - National 87,000.00 0.00 Signed 2022-01-27 2022-09-07 2022-02-17 2023-02-07 2022-04-02 2022-12-23 2022-05-02 2023-02-21 2022-06-06 2022-12-03 de 10 schémas communaux cation Selection ancement de gestion des ressources pa storales Page 4 ML-PRAPS-ML-268837-CS-CQ Sustainable landscape mana Consultant Qualifi S / Études techniques des bo IDA / D7990 gement and governance enh Post Open - National 26,000.00 0.00 Signed 2022-02-21 2022-03-07 2022-03-14 2022-05-26 2022-04-27 2022-05-23 2022-05-27 2022-07-26 2022-07-01 2022-12-28 cation Selection urgoutières par un consultan ancement t ML-PRAPS-ML-268855-CS-CQ Sustainable landscape mana Consultant Qualifi S / Études techniques des poi IDA / D7990 gement and governance enh Post Open - National 57,000.00 0.00 Canceled 2022-03-22 2023-03-07 2022-04-12 2022-05-26 2022-06-25 2022-07-30 2022-11-27 cation Selection nts d'eau (forages) du Centre ancement et du Nord ML-PRAPS-ML-268859-CS-CQ Sustainable landscape mana Consultant Qualifi Under Implement S / Études techniques des poi IDA / D7990 gement and governance enh Post Open - National 28,000.00 0.00 2022-03-22 2023-04-24 2022-04-12 2023-05-23 2022-05-26 2022-06-25 2022-07-30 2022-11-27 cation Selection ation nts d'eau (mares et retenues ancement d'eau) ML-PRAPS-ML-268911-CS-CQ Social and economic inclusio S / Mobilisation d'une experti Consultant Qualifi Under Implement IDA / D7990 n improvement, women and Post Open - National 9,000.00 0.00 2022-04-26 2022-05-13 2022-05-17 2022-11-04 2022-06-30 2022-07-12 2022-07-30 2022-09-03 2023-03-02 se pour l’appui à l’obtention cation Selection ation youth des documents d’état civil ML-PRAPS-ML-268932-CS-QC Project coordination, instituti BS / Audit financier et compt Quality And Cost- IDA / D7990 onal strengthening, crisis pr Post Open - National 37,000.00 0.00 Signed 2022-05-17 2022-03-30 2022-06-07 2022-05-27 2022-07-21 2022-06-23 2022-08-18 2022-08-24 2022-09-17 2022-07-30 2022-10-22 2022-09-27 2022-11-26 2025-11-25 able du PRAPS II Exercices 20 Based Selection evention and response 22, 2023 et 2024 ML-PRAPS-ML-269105-CS-CQ Project coordination, instituti Consultant Qualifi Pending Impleme S / Surveillance et contrôles IDA / D7990 onal strengthening, crisis pr Post Open - National 26,000.00 0.00 2022-05-10 2022-05-31 2022-07-14 2022-08-13 2022-09-17 2023-01-15 cation Selection ntation de la réalisation des magasin evention and response s ML-PRAPS-ML-271159-CS-CQ Animal health improvement S / Conduite de l’évaluation s Consultant Qualifi IDA / D7990 and veterinary medicine con Post Open - National 35,000.00 0.00 Signed 2022-01-31 2022-05-26 2022-02-21 2022-10-14 2022-04-06 2022-12-29 2022-05-06 2022-12-30 2022-06-10 2022-09-08 ociale des infrastructures de cation Selection trol Gao, Tombouctou, Kidal et M énaka ML-PRAPS-ML-271161-CS-CQ Animal health improvement S / Conduite de l’évaluation s Consultant Qualifi IDA / D7990 and veterinary medicine con Post Open - National 43,000.00 0.00 Signed 2022-01-12 2022-05-26 2022-02-02 2022-10-14 2022-03-18 2022-12-29 2022-04-17 2023-01-30 2022-05-22 2022-08-20 ociale des infrastructures de cation Selection trol Sikasso, et Mopti ML-PRAPS-ML-271162-CS-CQ Animal health improvement S / Conduite de l’évaluation s Consultant Qualifi IDA / D7990 and veterinary medicine con Post Open - National 35,000.00 0.00 Signed 2022-02-10 2022-05-26 2022-03-03 2022-10-14 2022-04-16 2022-12-29 2022-05-16 2023-01-30 2022-06-20 2022-09-18 ociale des infrastructures de cation Selection trol de Kayes et Koulikoro ML-PRAPS-ML-268846-CS-CQ S / Contrôle et la surveillance Sustainable landscape mana Consultant Qualifi Under Implement des travaux d'équipement de IDA / D7990 gement and governance enh Post Open - National 43,000.00 0.00 2022-04-20 2022-04-29 2022-05-11 2022-05-26 2022-06-24 2022-07-19 2022-07-24 2022-10-12 2022-08-28 2022-11-26 cation Selection ation 15 forages en Systèmes Hydr ancement aulique Pastorale Améliorés ML-PRAPS-ML-268862-CS-CQ S / Etudes techniques des inf Livestock value chain impro Consultant Qualifi IDA / D7990 Post Open - National 15,000.00 0.00 Canceled 2022-07-27 2022-08-03 2022-08-17 2022-10-14 2022-09-30 2022-10-30 2022-12-04 2023-04-03 rastructures marchandes dan vement cation Selection s la zone du Delta Central ML-PRAPS-ML-268844-CS-CQ Sustainable landscape mana Consultant Qualifi Under Implement S / Études techniques des pis IDA / D7990 gement and governance enh Post Open - National 87,000.00 0.00 2022-09-15 2023-05-04 2022-10-06 2023-05-23 2022-11-19 2022-12-19 2023-01-23 2023-07-22 cation Selection ation tes à bétail ancement ML-PRAPS-ML-268848-CS-CQ Sustainable landscape mana Consultant Qualifi S / Études techniques des poi IDA / D7990 gement and governance enh Post Open - National 35,000.00 0.00 Canceled 2022-09-20 2023-03-07 2022-10-11 2022-11-24 2022-12-24 2023-01-28 2023-04-28 cation Selection nts d'eau (forages) du Sud ancement ML-PRAPS-ML-268841-CS-CQ S / Encadrement des populati Sustainable landscape mana Consultant Qualifi Under Implement ons pour la Réalisation des p IDA / D7990 gement and governance enh Post Open - National 25,000.00 0.00 2022-10-20 2022-10-05 2022-11-10 2022-10-27 2022-12-24 2023-01-23 2023-02-27 2023-08-26 cation Selection ation are-feu pour lutter contre les ancement feux de brousse /protection d es espaces pastoraux ML-PRAPS-ML-268845-CS-CQ Sustainable landscape mana Consultant Qualifi Under Implement S / Actualisation des études t IDA / D7990 gement and governance enh Post Open - National 52,000.00 0.00 2022-03-31 2023-02-28 2022-04-21 2023-03-14 2022-06-04 2023-04-14 2022-07-04 2022-08-08 2022-10-22 cation Selection ation echniques des périmètres pa ancement storaux ML-PRAPS-ML-311364-CS-CQ S / Etudes techniques et suivi Livestock value chain impro Consultant Qualifi IDA / D7990 Post Open - National 21,000.00 0.00 Canceled 2022-08-25 2022-10-06 2022-09-15 2022-10-29 2022-11-28 2023-01-02 2023-05-02 des infrastructures marchand vement cation Selection es dans la zone Mali Nord Est ML-PRAPS-ML-322368-CS-CQ Social and economic inclusio S / Etude sur l'inclusion des p Consultant Qualifi IDA / D7990 n improvement, women and Post Open - National 20,000.00 0.00 Signed 2022-10-25 2022-10-25 2022-11-15 2022-12-08 2022-12-29 2023-02-01 2023-01-28 2022-09-02 2023-03-04 2023-04-18 opulations pastorales et agro cation Selection youth pastorales dans le registre so cial unifié au Mali ML-PRAPS-ML-328606-CS-CQ Social and economic inclusio S / Recrutement d’un consult Consultant Qualifi Under Implement IDA / D7990 n improvement, women and Post Limited 14,000.00 0.00 2022-12-08 2023-03-24 2022-12-22 2023-01-21 2023-02-25 2023-08-24 ant pour la Formation profess cation Selection ation youth ionnelle dans la région de Ka yes ML-PRAPS-ML-328609-CS-CQ Social and economic inclusio S / Recrutement d’un consult Consultant Qualifi Under Implement IDA / D7990 n improvement, women and Post Limited 14,000.00 0.00 2022-12-08 2023-03-24 2022-12-22 2023-05-04 2023-01-21 2023-02-25 2023-08-24 ant pour la formation profess cation Selection ation youth ionnelle dans la région de Sé gou ML-PRAPS-ML-328610-CS-CQ Social and economic inclusio S / Recrutement d’un consult Consultant Qualifi Under Implement IDA / D7990 n improvement, women and Post Limited 14,000.00 0.00 2022-12-08 2023-03-24 2022-12-22 2023-01-21 2023-02-25 2023-08-24 ant pour la formation profess cation Selection ation youth ionnelle dans la région de Mo pti ML-PRAPS-ML-340784-CS-CQ S / Etudes techniques et la su Animal health improvement rveillance des travaux de con Consultant Qualifi IDA / D7990 and veterinary medicine con Post Open - National 45,000.00 0.00 Under Review 2023-04-03 2023-05-24 2023-04-24 2023-06-07 2023-07-07 2023-08-11 2024-02-07 struction et réhabilitation des cation Selection trol infrastructures de la santé an imale dans les régions du su d ML-PRAPS-ML-340786-CS-CQ S / Etudes techniques et la su Animal health improvement Consultant Qualifi rveillance des travaux de de IDA / D7990 and veterinary medicine con Post Open - National 45,000.00 0.00 Under Review 2023-04-05 2023-05-24 2023-04-26 2023-06-09 2023-07-09 2023-08-13 2024-02-09 cation Selection construction des infrastructur trol es de la santé animale dans l es régions du nord Page 5 ML-PRAPS-ML-340818-CS-CQ S / Recrutement d’ONG pour Sustainable landscape mana l’appui-accompagnement de Consultant Qualifi IDA / D7990 gement and governance enh Post Open - National 18,000.00 0.00 Under Review 2023-05-26 2023-05-12 2023-06-16 2023-07-30 2023-08-29 2023-10-03 2024-03-31 s populations pour la restaur cation Selection ancement ation de 500 ha de zones dé gradées aux alentours des p oints d’eau ML-PRAPS-ML-340820-CS-CQ S / Recrutement d'ONG pour Sustainable landscape mana Consultant Qualifi l'appui-accompagnement po IDA / D7990 gement and governance enh Post Open - National 70,000.00 0.00 Under Review 2023-05-29 2023-05-15 2023-06-19 2023-08-02 2023-09-01 2023-10-06 2024-04-03 cation Selection ur la restauration/gestion de ancement 2 000 ha de bourgoutières ML-PRAPS-ML-340822-CS-CQ S / Recrutement d’ONG pour Sustainable landscape mana l’appui-accompagnement de Consultant Qualifi Pending Impleme IDA / D7990 gement and governance enh Post Open - National 35,000.00 0.00 2023-05-30 2023-06-20 2023-08-03 2023-09-02 2023-10-07 2024-04-04 s populations pour la récupér cation Selection ntation ancement ation de 2 000 ha de pâturag es dégradés avec des techni ques simples ML-PRAPS-ML-340839-CS-CQ Sustainable landscape mana Consultant Qualifi Pending Impleme S / Contrôles et la surveillanc IDA / D7990 gement and governance enh Post Open - National 23,000.00 0.00 2023-07-17 2023-08-07 2023-09-20 2023-10-20 2023-11-24 2024-05-22 cation Selection ntation e des travaux des 200 km de ancement pistes à bétail ML-PRAPS-ML-340840-CS-CQ Sustainable landscape mana S / Contrôle et la surveillance Consultant Qualifi Pending Impleme IDA / D7990 gement and governance enh Post Open - National 23,000.00 0.00 2023-07-17 2023-08-07 2023-09-20 2023-10-20 2023-11-24 2024-05-22 des travaux de quatre (04) p cation Selection ntation ancement érimètres pastoraux ML-PRAPS-ML-341049-CS-CQ Sustainable landscape mana Consultant Qualifi Pending Impleme S / Relecture du Décret porta IDA / D7990 gement and governance enh Post Open - National 35,000.00 0.00 2023-04-19 2023-05-10 2023-06-23 2023-07-23 2023-08-27 2023-12-25 cation Selection ntation nt Charte Pastorale en Répub ancement lique du Mali ML-PRAPS-ML-341050-CS-CQ Sustainable landscape mana S / Elaboration des Etudes co Consultant Qualifi Pending Impleme IDA / D7990 gement and governance enh Post Open - National 35,000.00 0.00 2023-03-22 2023-04-12 2023-05-26 2023-06-25 2023-07-30 2023-11-27 mplémentaires à la Stratégie cation Selection ntation ancement Nationale d’Hydraulique Past orale ML-PRAPS-ML-341063-CS-CQ Sustainable landscape mana Consultant Qualifi Pending Impleme S / Appui à l'étude de la filièr IDA / D7990 gement and governance enh Post Open - National 35,000.00 0.00 2023-05-02 2023-05-23 2023-07-06 2023-08-05 2023-09-09 2024-01-07 cation Selection ntation e du Bourgou ancement ML-PRAPS-ML-341073-CS-CQ Sustainable landscape mana S / Recrutement d’une ONG p Consultant Qualifi Pending Impleme IDA / D7990 gement and governance enh Post Open - National 15,000.00 0.00 2023-05-29 2023-06-19 2023-08-02 2023-09-01 2023-10-06 2024-02-03 our le suivi-accompagnemen cation Selection ntation ancement t de la réalisation des pare-fe u ML-PRAPS-ML-341075-CS-CQ Sustainable landscape mana Consultant Qualifi Pending Impleme S / Etudes techniques du fora IDA / D7990 gement and governance enh Post Open - National 42,000.00 0.00 2023-03-20 2023-04-10 2023-05-24 2023-06-23 2023-07-28 2023-10-26 cation Selection ntation ge pilote ancement ML-PRAPS-ML-341078-CS-CQ S / Etudes et la Supervision d Livestock value chain impro Consultant Qualifi Under Implement es travaux de construction et IDA / D7990 Post Open - National 52,000.00 0.00 2023-02-28 2023-04-05 2023-03-21 2023-05-04 2023-05-04 2023-01-17 2023-06-03 2023-03-15 2023-07-08 2024-01-04 vement cation Selection ation de réhabilitation des infrastr uctures marchandes dans la zone du Delta Central ML-PRAPS-ML-341079-CS-CQ S / Etudes et la Supervision d Livestock value chain impro Consultant Qualifi Under Implement es travaux de construction et IDA / D7990 Post Open - National 52,000.00 0.00 2023-02-28 2023-04-06 2023-03-21 2023-05-04 2023-05-04 2023-01-17 2023-06-03 2023-03-30 2023-07-08 2024-01-04 vement cation Selection ation de réhabilitation des infrastr uctures marchandes dans la zone du Mali Nord Est ML-PRAPS-ML-341268-CS-CQ Social and economic inclusio Consultant Qualifi Pending Impleme S / Alphabétisation des paste IDA / D7990 n improvement, women and Post Limited 9,000.00 0.00 2023-07-20 2023-08-03 2023-09-02 2023-10-07 2024-02-04 cation Selection ntation urs et agropasteurs youth ML-PRAPS-ML-269101-CS-CQ Project coordination, instituti S / Etudes techniques et suivi Consultant Qualifi Under Implement IDA / D7990 onal strengthening, crisis pr Post Open - National 45,000.00 0.00 2023-02-22 2023-03-16 2023-03-15 2023-05-11 2023-04-28 2023-05-28 2023-07-02 2023-12-29 des travaux de construction cation Selection ation evention and response de magasins d’aliments bétai l ML-PRAPS-ML-341350-CS-CQ S / Recrutement d’une ONG p Project coordination, instituti Consultant Qualifi Pending Impleme our la campagne d’informati IDA / D7990 onal strengthening, crisis pr Post Open - National 24,000.00 0.00 2023-05-17 2023-06-07 2023-07-21 2023-08-20 2023-09-24 2024-03-22 cation Selection ntation on sur les VBG/EAS/HS dans l evention and response es zones d’intervention du pr ojet ML-PRAPS-ML-341353-CS-CQ Project coordination, instituti Consultant Qualifi S / Elaboration de la Cartogra IDA / D7990 onal strengthening, crisis pr Post Open - National 21,000.00 0.00 Canceled 2023-04-11 2023-03-07 2023-05-02 2023-06-15 2023-07-15 2023-08-19 2024-02-15 cation Selection phie VBG/EAS/HS evention and response ML-PRAPS-ML-345122-CS-CQ S / Mobilisation d'une experti Social and economic inclusio Consultant Qualifi Under Implement se pour l’appui à l’obtention IDA / D7990 n improvement, women and Post Open - National 20,000.00 0.00 2023-03-14 2023-03-28 2023-04-04 2023-05-18 2023-06-17 2023-07-22 2024-01-18 cation Selection ation des documents d’état civil y youth compris les frais d’acquisitio n ML-PRAPS-ML-354733-CS-CQ Sustainable landscape mana Consultant Qualifi Under Implement S / Études techniques des poi IDA / D7990 gement and governance enh Post Open - National 28,261.00 0.00 2023-04-12 2023-04-25 2023-05-03 2023-05-23 2023-06-16 2023-07-16 2023-08-20 2023-11-18 cation Selection ation nts d'eau (forages) du Sud ancement ML-PRAPS-ML-354740-CS-CQ Sustainable landscape mana Consultant Qualifi Under Implement S / Études techniques des poi IDA / D7990 gement and governance enh Post Open - National 26,087.00 0.00 2023-04-12 2023-04-25 2023-05-03 2023-05-23 2023-06-16 2023-07-16 2023-08-20 2023-11-18 cation Selection ation nts d'eau (forages) du Centre ancement et du Nord INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRAPS-ML-266505-CS-IN Animal health improvement DV / Etudes environnemental Individual Consult IDA / D7990 and veterinary medicine con Post Limited 14,000.00 0.00 Canceled 2022-01-24 2023-04-06 2022-01-29 2022-02-19 2022-03-26 2022-09-22 es et sociales des infrastruct ant Selection trol ures de santé animale ML-PRAPS-ML-267879-CS-IN Sustainable landscape mana DV / Etudes environnemental Individual Consult IDA / D7990 gement and governance enh Post Limited 52,000.00 0.00 Signed 2022-01-24 2022-10-21 2022-01-29 2022-12-23 2022-02-19 2022-12-23 2022-03-26 2022-09-22 es et sociales des infrastruct ant Selection ancement ures d'aménagement pastora ux Page 6 ML-PRAPS-ML-267872-CS-IN DV / Etudes environnemental Animal health improvement Individual Consult es et sociales des infrastruct IDA / D7990 and veterinary medicine con Post Limited 52,000.00 0.00 Signed 2022-01-24 2022-10-21 2022-01-29 2022-12-28 2022-02-19 2023-01-23 2022-03-26 2022-09-22 ant Selection ures d'hydraulique pastorale trol dans les régions du sud ML-PRAPS-ML-267877-CS-IN DV / Etudes environnemental Sustainable landscape mana Individual Consult es et sociales des infrastruct IDA / D7990 gement and governance enh Post Limited 35,000.00 0.00 Signed 2022-01-25 2022-10-21 2022-01-30 2022-12-28 2022-02-20 2023-01-23 2022-03-27 2022-09-23 ant Selection ures d'hydraulique pastorale ancement dans les régions du centre ML-PRAPS-ML-267878-CS-IN DV / Etudes environnemental Sustainable landscape mana Individual Consult es et sociales des infrastruct IDA / D7990 gement and governance enh Post Limited 35,000.00 0.00 Signed 2022-01-27 2022-10-21 2022-02-01 2022-12-28 2022-02-22 2023-01-23 2022-03-29 2022-09-25 ant Selection ures d'hydraulique pastorale ancement dans les régions du nord ML-PRAPS-ML-268203-CS-IN DV / Etudes environnemental Livestock value chain impro Individual Consult IDA / D7990 Post Limited 24,000.00 0.00 Signed 2022-02-02 2022-11-03 2022-02-07 2022-12-28 2022-02-28 2023-01-23 2022-04-04 2022-07-03 es et sociales des infrastruct vement ant Selection ures marchandes ML-PRAPS-ML-268812-CS-IN Animal health improvement Individual Consult Pending Impleme DV / Élaboration du PNS de c IDA / D7990 and veterinary medicine con Post Limited 12,000.00 0.00 2022-06-13 2022-06-18 2022-07-09 2022-08-13 2023-02-09 ant Selection ntation ontrôle des médicaments vét trol érinaires ML-PRAPS-ML-268831-CS-IN Sustainable landscape mana Individual Consult DV / Formation de 25 agents IDA / D7990 gement and governance enh Post Limited 17,500.00 0.00 Signed 2022-02-10 2022-09-15 2022-02-15 2022-11-30 2022-03-08 2022-12-19 2022-04-12 2022-06-11 ant Selection en cartographies/ SIG/ Télédé ancement tection ML-PRAPS-ML-268867-CS-IN DV / Appui à la mise en place Livestock value chain impro Individual Consult Under Implement IDA / D7990 Post Limited 12,000.00 0.00 2022-01-25 2022-10-17 2022-01-30 2022-02-20 2022-03-27 2022-05-26 d'un modèle durable de four vement ant Selection ation niture de service SIMB ML-PRAPS-ML-268890-CS-IN DV / Étude sur les unités de f Livestock value chain impro Individual Consult IDA / D7990 Post Limited 26,000.00 19,905.80 Signed 2022-02-15 2022-04-14 2022-02-20 2022-05-24 2022-03-13 2022-07-13 2022-04-17 2022-07-30 2022-06-16 abrication d'aliment bétail et vement ant Selection de production des briques m ulti-nutritionnelles ML-PRAPS-ML-268892-CS-IN Livestock value chain impro Individual Consult DV / Opérateur pour l'accom IDA / D7990 Post Limited 26,000.00 0.00 Canceled 2022-02-20 2022-02-25 2022-03-18 2022-04-22 2022-10-19 vement ant Selection pagnement à l'élaboration de s sous projets ML-PRAPS-ML-268894-CS-IN DV / Identification des besoin Social and economic inclusio Individual Consult s des bénéficiaires, des offre IDA / D7990 n improvement, women and Post Limited 14,000.00 0.00 Signed 2022-02-28 2022-03-01 2022-03-05 2022-03-25 2022-03-26 2022-04-26 2022-04-30 2022-06-29 ant Selection s des centres de formations youth et les adaptations possibles ML-PRAPS-ML-268899-CS-IN Social and economic inclusio DV / Étude diagnostic sur les Individual Consult Under Implement IDA / D7990 n improvement, women and Post Limited 11,000.00 0.00 2022-02-14 2022-03-01 2022-02-19 2022-03-12 2022-04-16 2022-06-15 goulots d'étranglement de dé ant Selection ation youth livrance de documents d'état civil ML-PRAPS-ML-268902-CS-IN DV / Réalisation des campag Social and economic inclusio nes d’information et de sensi Individual Consult IDA / D7990 n improvement, women and Post Limited 12,000.00 0.00 Canceled 2022-04-20 2022-04-25 2022-05-16 2022-06-20 2022-08-19 bilisation des organisations d ant Selection youth e femmes et jeunes sur l'imp ortance des documents d'éta t civil ML-PRAPS-ML-268906-CS-IN DV / Réalisation des campag Social and economic inclusio nes d’information et sensibili Individual Consult IDA / D7990 n improvement, women and Post Limited 9,000.00 0.00 Canceled 2022-04-26 2022-05-01 2022-05-22 2022-06-26 2022-09-09 sation des organisations de f ant Selection youth emmes et jeunes sur l'import ance de l'enregistrement au registre social ML-PRAPS-ML-268926-CS-IN Project coordination, instituti Individual Consult Pending Impleme DV / Evaluation des réponses IDA / D7990 onal strengthening, crisis pr Post Limited 7,000.00 0.00 2022-06-20 2022-06-25 2022-07-16 2022-08-20 2023-02-16 ant Selection ntation de crises mises en œuvre evention and response ML-PRAPS-ML-268928-CS-IN Project coordination, instituti Individual Consult Pending Impleme DV / Réalisation de la situatio IDA / D7990 onal strengthening, crisis pr Post Limited 17,000.00 0.00 2022-02-28 2022-03-05 2022-03-26 2022-04-30 2022-07-29 ant Selection ntation n de références des sous proj evention and response ets ML-PRAPS-ML-269085-CS-IN Project coordination, instituti DV / Élaboration d’un manuel Individual Consult Pending Impleme IDA / D7990 onal strengthening, crisis pr Post Limited 14,000.00 0.00 2022-03-28 2022-04-02 2022-04-23 2022-05-28 2022-07-27 simplifié sauvegardes enviro ant Selection ntation evention and response nnementales et sociales et le s VBG ML-PRAPS-ML-269089-CS-IN Project coordination, instituti DV / Élaboration et mise en Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Limited 12,000.00 0.00 2022-02-23 2022-03-07 2022-02-28 2022-03-21 2022-04-25 2022-06-24 œuvre d’une stratégie et d’u ant Selection ation evention and response n plan de communication po ur le PRAPS II ML-PRAPS-ML-269094-CS-IN Project coordination, instituti Individual Consult DV / Élaboration d’un manuel IDA / D7990 onal strengthening, crisis pr Post Limited 9,000.00 8,295.99 Signed 2022-06-15 2022-03-23 2022-06-20 2022-04-25 2022-07-11 2022-05-31 2022-08-15 2022-07-28 2022-10-14 ant Selection simplifié genre evention and response ML-PRAPS-ML-269096-CS-IN Project coordination, instituti Individual Consult DV / Amélioration du plan de IDA / D7990 onal strengthening, crisis pr Post Limited 35,000.00 22,924.95 Signed 2022-02-16 2022-03-07 2022-02-21 2022-03-30 2022-03-14 2022-05-03 2022-04-18 2022-08-12 2022-06-17 ant Selection contingence national evention and response ML-PRAPS-ML-269131-CS-IN Project coordination, instituti Individual Consult DV / Mise en place et formati IDA / D7990 onal strengthening, crisis pr Post Limited 87,000.00 0.00 Canceled 2022-06-06 2022-06-11 2022-07-02 2022-08-06 2023-02-02 ant Selection on des comités de gestion evention and response ML-PRAPS-ML-269133-CS-IN Project coordination, instituti Individual Consult Pending Impleme DV / Audit environnemental e IDA / D7990 onal strengthening, crisis pr Post Limited 17,500.00 0.00 2022-01-31 2022-02-05 2022-02-26 2022-04-02 2022-06-01 ant Selection ntation t social du projet evention and response ML-PRAPS-ML-271966-CS-IN Project coordination, instituti Individual Consult DV / Recrutement d'un Assist IDA / D7990 onal strengthening, crisis pr Post Open 171,500.00 0.00 Signed 2022-01-20 2022-10-25 2022-03-10 2023-03-16 2022-03-31 2023-04-11 2022-05-05 2027-12-31 ant Selection ant en Passation de Marchés evention and response ML-PRAPS-ML-282116-CS-IN DV / Réalisation de l'audit de Livestock value chain impro Individual Consult IDA / D7990 Post Limited 12,000.00 11,129.30 Signed 2022-04-13 2022-03-10 2022-04-18 2022-04-22 2022-05-09 2022-05-03 2022-06-13 2022-07-30 2022-09-11 s OP faîtières nationales et él vement ant Selection aboration d'un plan d'action Page 7 ML-PRAPS-ML-282441-CS-IN DV / Opérateur pour l'accom Livestock value chain impro Individual Consult Under Implement pagnement à l'élaboration de IDA / D7990 Post Open 10,000.00 0.00 2022-03-30 2022-04-01 2022-05-18 2022-07-13 2022-06-08 2022-08-01 2022-07-13 2024-07-02 vement ant Selection ation s sous projets dans les région s de Kayes et Koulikoro ML-PRAPS-ML-282443-CS-IN DV / Opérateur pour l'accom Livestock value chain impro Individual Consult Under Implement pagnement à l'élaboration de IDA / D7990 Post Open 10,000.00 0.00 2022-03-30 2022-04-01 2022-05-18 2022-07-13 2022-06-08 2022-08-03 2022-07-13 2024-07-02 vement ant Selection ation s sous projets dans les région s de Sikasso, Ségou et Mopti ML-PRAPS-ML-282445-CS-IN DV / Opérateur pour l'accom Livestock value chain impro Individual Consult Under Implement pagnement à l'élaboration de IDA / D7990 Post Open 10,000.00 0.00 2022-03-30 2022-04-01 2022-05-18 2022-07-13 2022-06-08 2022-08-03 2022-07-13 2024-07-02 vement ant Selection ation s sous projets dans les région s de Tombouctou, Gao, Kidal, Ménaka et Taoudenit ML-PRAPS-ML-290437-CS-IN Animal health improvement Individual Consult DV / Mise à jour de la base d IDA / D7990 and veterinary medicine con Post Open 17,500.00 0.00 Signed 2022-06-15 2022-05-26 2022-08-03 2023-02-28 2022-08-24 2023-04-03 2022-09-28 2023-01-26 ant Selection e données infrastructures DN trol SV ML-PRAPS-ML-291968-CS-IN Project coordination, instituti DV / RECRUTEMENT D’UN EX Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 49,714.00 0.00 2022-05-31 2022-05-26 2022-06-10 2021-11-27 2022-07-01 2022-08-05 2023-02-01 PERT EN SANTE ANIMALE AU ant Selection ation evention and response COMPTE DU PRAPS II-ML/PAD EL-M ML-PRAPS-ML-292007-CS-IN Project coordination, instituti DV / RECRUTEMENT D'UN DI Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Prior Direct 324,220.00 0.00 2022-05-31 2022-11-23 2022-06-10 2021-11-08 2022-07-01 2023-04-20 2022-08-05 2023-02-01 RECTEUR TECHNIQUE AU CO ant Selection ation evention and response MPTE DU PRAPS MALI 2 ML-PRAPS-ML-292002-CS-IN Project coordination, instituti Individual Consult Under Implement DV / RECRUTEMENT D'UN AU IDA / D7990 onal strengthening, crisis pr Post Direct 248,568.00 0.00 2022-05-31 2022-05-26 2022-06-10 2021-11-08 2022-07-01 2022-08-05 2023-02-01 ant Selection ation DITEUR INTERNE DU PRAPS- evention and response ML 2 / PADEL-M ML-PRAPS-ML-292001-CS-IN Project coordination, instituti DV / RECRUTEMENT D'UN EX Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 248,568.00 0.00 2022-05-31 2022-09-16 2022-06-10 2021-11-26 2022-07-01 2022-08-05 2023-02-01 PERT CHARGE DE COMMUNIC ant Selection ation evention and response ATION DU PRAPS II-ML/ PADE L-M ML-PRAPS-ML-291987-CS-IN Project coordination, instituti DV / RECRUTEMENT D'UN EX Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 298,282.00 0.00 2022-05-31 2022-05-26 2022-06-10 2021-11-23 2022-07-01 2022-08-05 2023-02-01 PERT GENRE ET VIOLANCE B ant Selection ation evention and response ASEE SUR LE GENRE PRAPS II -ML/PADELM ML-PRAPS-ML-291994-CS-IN Project coordination, instituti DV / RECRUTEMENT D'UN RE Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 298,282.00 0.00 2022-05-31 2022-09-16 2022-06-10 2021-11-29 2022-07-01 2022-08-05 2023-02-01 SPONSABLE SUIVI & EVALUA ant Selection ation evention and response TION DU PRAPS-ML/PADEL-M ML-PRAPS-ML-291996-CS-IN Project coordination, instituti DV / RECRUTEMENT D'UN SP Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 298,282.00 0.00 2022-05-31 2022-05-26 2022-06-10 2021-11-12 2022-07-01 2022-08-05 2023-02-01 ECIALISTE EN SAUVEGARDES ant Selection ation evention and response ENVIRONNEMENTALES DU PR APS-ML II / PADEL-M ML-PRAPS-ML-291997-CS-IN Project coordination, instituti DV / RECRUTEMENT D'UN SP Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 162,110.00 0.00 2022-05-31 2022-05-26 2022-06-10 2021-11-15 2022-07-01 2022-08-05 2023-02-01 ECIALISTE EN SAUVEGARDES ant Selection ation evention and response SOCIALE DU PRAPS-ML 2 / PA DEL-M ML-PRAPS-ML-291998-CS-IN DV / RECRUTEMENT D'UN SP Project coordination, instituti Individual Consult ECIALISTE EN PASSATION DE IDA / D7990 onal strengthening, crisis pr Post Direct 298,282.00 0.00 Signed 2022-05-31 2022-05-26 2022-06-10 2021-11-10 2022-07-01 2021-11-11 2022-08-05 2023-02-01 ant Selection S MARCHES POUR LES PROJE evention and response TS PADELM PRAPS II-ML ML-PRAPS-ML-291993-CS-IN Project coordination, instituti DV / RECRUTEMENT D’UN RE Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 298,282.00 0.00 2022-05-31 2022-05-26 2022-06-10 2021-11-05 2022-07-01 2022-08-05 2023-02-01 SPONSABLE ADMINISTRATIF ant Selection ation evention and response ET FINANCIER POUR LE PRAP S-ML ET LE PADEL-M ML-PRAPS-ML-295450-CS-IN Project coordination, instituti DV / RECRUTEMENT DE L’EXP Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 298,282.00 0.00 2022-05-31 2022-11-02 2022-06-10 2021-11-02 2022-07-01 2022-08-05 2027-12-31 ERT EN INCLUSION SOCIALE ant Selection ation evention and response ET GESTION DES CRISES DU PRAPS 2-ML/PADEL-M ML-PRAPS-ML-295455-CS-IN Project coordination, instituti DV / RECRUTEMENT DE L’EXP Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 259,375.00 0.00 2022-05-31 2022-11-02 2022-06-10 2022-07-01 2022-08-05 2027-12-31 ERT AMELIORATION DES CHA ant Selection ation evention and response INES DE VALEUR DU BETAIL DU PRAPS II-ML ML-PRAPS-ML-291981-CS-IN Project coordination, instituti DV / RECRUTEMENT DE L’EXP Individual Consult Under Implement IDA / D7990 onal strengthening, crisis pr Post Direct 43,230.00 0.00 2022-05-31 2022-11-02 2022-06-10 2021-11-29 2022-07-01 2021-12-01 2022-08-05 2022-12-31 ERT GESTION ET GOUVERNA ant Selection ation evention and response NCE DURABLES DES PAYSAG ES DU PRAPS II-ML ML-PRAPS-ML-302836-CS-IN Livestock value chain impro Individual Consult DV / Clarification du concept IDA / D7990 Post Limited 27,000.00 0.00 Signed 2022-08-03 2022-08-16 2022-08-08 2022-11-16 2022-08-29 2022-11-25 2022-10-03 2022-11-17 vement ant Selection de SP CV innovant et adaptat ion du Manuel ML-PRAPS-ML-303976-CS-IN Sustainable landscape mana DV / Traduction des parties e Individual Consult IDA / D7990 gement and governance enh Post Limited 17,500.00 24,343.04 Signed 2022-08-10 2022-03-16 2022-08-15 2022-05-13 2022-09-05 2022-07-21 2022-10-10 2022-08-17 2022-11-09 ssentielles des textes législat ant Selection ancement ifs et réglementaires GRN ML-PRAPS-ML-303978-CS-IN Project coordination, instituti Individual Consult DV / Réalisation de l'Audit ge IDA / D7990 onal strengthening, crisis pr Post Limited 17,500.00 16,876.20 Signed 2022-08-09 2022-04-13 2022-08-14 2022-04-27 2022-09-04 2022-05-23 2022-10-09 2022-08-12 2022-11-23 ant Selection nre du PRAPS 2-ML evention and response ML-PRAPS-ML-269090-CS-IN Project coordination, instituti Individual Consult DV / Réalisation de l'audit ge IDA / D7990 onal strengthening, crisis pr Post Limited 9,000.00 0.00 Canceled 2022-01-19 2022-04-13 2022-01-24 2022-04-27 2022-02-14 2022-03-21 2022-05-20 ant Selection nre du PRAPS II evention and response ML-PRAPS-ML-268819-CS-IN Sustainable landscape mana DV / Traduction des parties e Individual Consult IDA / D7990 gement and governance enh Post Limited 10,500.00 0.00 Canceled 2022-01-25 2022-03-16 2022-01-30 2022-02-20 2022-03-27 2022-05-26 ssentielles des textes législat ant Selection ancement ifs et réglementaires GRN ML-PRAPS-ML-341062-CS-IN Livestock value chain impro Individual Consult Pending Impleme DV / Réalisation d’une analys IDA / D7990 Post Limited 7,000.00 0.00 2023-07-24 2023-07-29 2023-08-19 2023-09-23 2023-12-22 vement ant Selection ntation e environnementale des proj ets innovants Page 8 ML-PRAPS-ML-341057-CS-IN Livestock value chain impro Individual Consult Pending Impleme DV / Réalisation d’une analys IDA / D7990 Post Limited 7,000.00 0.00 2023-08-24 2023-08-29 2023-09-19 2023-10-24 2024-02-21 vement ant Selection ntation e sociale des projets innovan ts ML-PRAPS-ML-341060-CS-IN DV / Réalisation des sauvega Sustainable landscape mana Individual Consult Pending Impleme rdes environnementales et s IDA / D7990 gement and governance enh Post Limited 18,000.00 0.00 2023-09-26 2023-10-01 2023-10-22 2023-11-26 2024-01-25 ant Selection ntation ociales des infrastructures de ancement production de fourrage ML-PRAPS-ML-341081-CS-IN DV / Mise en place et la form Livestock value chain impro Individual Consult Under Implement IDA / D7990 Post Limited 28,000.00 0.00 2023-04-12 2023-03-07 2023-04-17 2023-05-03 2023-05-08 2023-05-17 2023-06-12 2023-09-10 ation des comités de gestion vement ant Selection ation des marchés à bétails ML-PRAPS-ML-269098-CS-IN Project coordination, instituti DV / Appui à l’élaboration de Individual Consult Pending Impleme IDA / D7990 onal strengthening, crisis pr Post Limited 53,000.00 0.00 2023-06-20 2023-06-25 2023-07-16 2023-08-20 2023-10-19 s plans de contingence régio ant Selection ntation evention and response nal et communal (préparatio n locale) ML-PRAPS-ML-341284-CS-IN Project coordination, instituti Individual Consult Pending Impleme DV / Formation des comités d IDA / D7990 onal strengthening, crisis pr Post Limited 87,000.00 0.00 2023-07-10 2023-07-15 2023-08-05 2023-09-09 2023-12-08 ant Selection ntation e gestion des magasins d’ali evention and response ments bétail ML-PRAPS-ML-341314-CS-IN Project coordination, instituti Individual Consult DV / Evaluation des réponses IDA / D7990 onal strengthening, crisis pr Post Limited 9,000.00 0.00 Under Review 2023-06-22 2023-06-26 2023-06-27 2023-07-18 2023-08-22 2024-02-18 ant Selection mises en œuvre evention and response ML-PRAPS-ML-341348-CS-IN DV / Organisation des sessio Project coordination, instituti Individual Consult Pending Impleme ns de formation de l’équipe P IDA / D7990 onal strengthening, crisis pr Post Limited 99,000.00 0.00 2023-07-20 2023-07-25 2023-08-15 2023-09-19 2024-03-17 ant Selection ntation RAPS et des partenaires sur l evention and response a santé et sécurité dans le tr avail ML-PRAPS-ML-341357-CS-IN DV / Elaboration d’un manuel Project coordination, instituti Individual Consult Pending Impleme simplifié sauvegardes enviro IDA / D7990 onal strengthening, crisis pr Post Limited 27,000.00 0.00 2023-02-28 2023-03-05 2023-03-26 2023-04-30 2023-10-27 ant Selection ntation nnementales et sociales et le evention and response s VBG à l’usage des partenair es et bénéficiaires ML-PRAPS-ML-342030-CS-IN DV / Formation des OP sur le Livestock value chain impro Individual Consult IDA / D7990 Post Limited 17,500.00 0.00 Canceled 2023-04-24 2023-04-25 2023-04-29 2023-05-20 2023-06-24 2023-12-21 s techniques de communicati vement ant Selection ons dans leur organisation ML-PRAPS-ML-342035-CS-IN Project coordination, instituti DV / Mise en place et fonctio Individual Consult Pending Impleme IDA / D7990 onal strengthening, crisis pr Post Limited 11,000.00 0.00 2023-03-30 2023-04-04 2023-04-25 2023-05-30 2023-11-26 nnement du système de com ant Selection ntation evention and response munication interne ML-PRAPS-ML-342036-CS-IN Project coordination, instituti DV / Identification et formatio Individual Consult Pending Impleme IDA / D7990 onal strengthening, crisis pr Post Limited 11,000.00 0.00 2023-03-30 2023-04-04 2023-04-25 2023-05-30 2023-11-26 n des points focaux régionau ant Selection ntation evention and response x et locaux communication ML-PRAPS-ML-342039-CS-IN Project coordination, instituti Individual Consult Pending Impleme DV / Réalisation de missions IDA / D7990 onal strengthening, crisis pr Post Limited 17,500.00 0.00 2023-02-28 2023-03-05 2023-03-26 2023-04-30 2023-10-27 ant Selection ntation de communication terrain evention and response ML-PRAPS-ML-340806-CS-IN DV / Renforcement des capa Animal health improvement Individual Consult Pending Impleme cités des professionnels du IDA / D7990 and veterinary medicine con Post Open - National 12,000.00 0.00 2023-05-10 2023-06-28 2023-07-19 2023-08-23 2023-12-21 ant Selection ntation médicament vétérinaire sur l trol a qualité des médicaments ML-PRAPS-ML-344928-CS-IN Project coordination, instituti Individual Consult Pending Impleme DV / Réalisation de missions IDA / D7990 onal strengthening, crisis pr Post Limited 7,000.00 0.00 2023-03-20 2023-03-25 2023-04-15 2023-05-20 2023-07-19 ant Selection ntation d’identification de cas de suc evention and response cès genre ML-PRAPS-ML-351817-CS-IN Project coordination, instituti DV / Recrutement d'un Exper Individual Consult Under Implement IDA / 68610 onal strengthening, crisis pr Post Open - National 221,765.00 0.00 2023-04-04 2023-04-24 2023-05-23 2023-06-13 2023-07-18 2027-12-24 t en Sauvegardes Environne ant Selection ation evention and response mentales pour le PRAPS 2-ML ML-PRAPS-ML-351821-CS-IN Project coordination, instituti Individual Consult Under Implement DV / Recrutement du Directe IDA / 68610 onal strengthening, crisis pr Post Open - National 241,050.00 0.00 2023-04-10 2023-04-26 2023-05-29 2023-06-19 2023-07-24 2027-12-30 ant Selection ation ur Technique du PRAPS 2-ML evention and response ML-PRAPS-ML-352063-CS-IN Project coordination, instituti DV / Recrutement de l'Assist Individual Consult Pending Impleme IDA / 68610 onal strengthening, crisis pr Post Open - National 100,000.00 0.00 2023-04-12 2023-05-31 2023-06-21 2023-07-26 2028-01-01 ant Administratif et Financier ant Selection ntation evention and response de l'Antenne de Gao du PRAP S 2-ML ML-PRAPS-ML-360623-CS-IN DV / Etudes environnemental Animal health improvement Individual Consult es et Sociales des Infrastruct IDA / D7990 and veterinary medicine con Post Limited 14,000.00 0.00 Under Review 2023-05-17 2023-06-01 2023-05-22 2023-06-12 2023-07-17 2024-01-13 ant Selection ures de santé animale dans l trol es régions de Kayes et Koulik oro ML-PRAPS-ML-360627-CS-IN Animal health improvement DV / Etudes environnemental Individual Consult IDA / D7990 and veterinary medicine con Post Limited 21,000.00 0.00 Under Review 2023-05-18 2023-06-05 2023-05-23 2023-06-13 2023-07-18 2024-01-14 es et sociales des Infrastruct ant Selection trol ures de santé animale dans l es régions du Nord ML-PRAPS-ML-360629-CS-IN DV / Etudes environnemental Animal health improvement Individual Consult es et sociales des Infrastruct IDA / D7990 and veterinary medicine con Post Limited 26,000.00 0.00 Under Review 2023-05-18 2023-06-05 2023-05-23 2023-06-13 2023-07-18 2024-01-14 ant Selection ures de santé animale dans l trol es régions de Sikasso, Ségou et Mopti Page 9 MINISTERE DES TRAVAUX PUBLICS -------------------- DIRECTION GENERALE DES TRAVAUX PUBLICS -------------------- AGENCE ROUTIERE Stratégie de Passation des Marchés du Projet pour Promouvoir le Développement (PPSD) Programme de connectivité pour une croissance inclusive de Madagascar (PCCIM) Pays : Madagascar Montant : 400 millions USD Numéro identifiant du Projet : P173711 08 Février 2022 Table des matières 1. Présentation du projet ..................................................................................1 A. Description du projet .................................................................................1 B. Objectif de développement du projet : ......................................................1 C. Composantes du Projet..............................................................................1 D. Indicateurs de résultats .............................................................................4 2. Aperçu du Pays et du Marché .......................................................................5 A. Contexte opérationnel .................................................................................5 1. i. Caractéristiques générales ................................................................5 2. ii. Aspects institutionnels ......................................................................5 3. iii. Aspects socio-économiques .............................................................5 4. iv. Données sectorielles ........................................................................6 5. v. Aspects technologiques ....................................................................6 6. vi. Aspects Environnementaux et de développement durable..............7 7. vii. Cadre de passation de marchés du pays ........................................7 B. Capacité du client et de l’Unité de Coordination de projet (UCP).................8 8. i. Identification de l’Acheteur................................................................8 9. ii. Besoin d’accompagnement/d’assistance ..........................................8 10. iii. Système de gestion des plaintes et résolutions de conflits..............8 C. Etudes et Analyse de l’état du marché ........................................................9 11. Travaux...............................................................................................11 12. Fournitures .........................................................................................11 13. Consultant ..........................................................................................12 14. Services autres que services de Consultants......................................13 15. Autres : ...............................................................................................13 3. ANALYSE DES RISQUES LIES A LA PASSATION DE MARCHES ......................14 4. Analyse des risques liés à la passation de marchés ...................................18 5. OBJECTIFS PRIORITAIRES DE PASSATION DE MARCHES ..............................24 16. Types de stratégies achats recommandés .........................................24 1. Plan de passation de marchés simplifié..............................................27 1. Présentation du projet Pays : Madagascar Nom complet du projet : Programme de connectivité pour une croissance inclusive de Madagascar (PCCIM) Montant total du US$ 400.000.000 financement (Dollars) : Numéro identifiant du P173711 projet : Objectif de développement Améliorer la longévité, la sécurité et la résilience du Projet : climatique de certaines routes principales revêtues à Madagascar. A. Description du projet Le budget pour la mise en œuvre du projet est de $400 millions, réparti comme suit : Montant # Composantes % en Million USD Amélioration des conditions et de la résilience des 1 320,00 80% routes Améliorer l'accessibilité et les avantages socio- 2 70,00 18% économiques des routes de desserte. Assistance Technique et Appui aux réformes du secteur 3 10,00 3% du transport Composante d'Intervention d'Urgence Contingente 4 0,00 0% (CERC) TOTAL 400,00 100% B. Objectif de développement du projet : L'objectif de développement du projet est d'améliorer la connectivité, la résilience et la gestion des routes principales dans les zones rurales sélectionnées, y compris dans le sud, pour un meilleur accès aux opportunités sociales et économiques des communautés rurales. C. Composantes du Projet • Composante 1 : Amélioration des conditions et de la résilience des routes (US$320.0 millions) Sous-Composante 1.1. Réhabilitation des routes nationales prioritaires (US$306.9 millions). Cette sous-composante financera des travaux et des services de conseil pour soutenir la réhabilitation et le bitumage des routes nationales dans les zones rurales, principalement le tronçon de route en terre de 100 km de la RN31 entre Mangoaka et Bealalana (70 millions de dollars) et le bitumage de la majeure partie de la RN10 (236,9 millions de dollars, sur 400 km de route en terre). La conception et les travaux incluront les besoins d'infrastructures auxiliaires le long de ces routes principales, tels que des canaux et des conduites pour simplifier la fourniture future de services publics et de câbles à fibres optiques si nécessaire et convenus avec les autorités compétentes par le biais de consultations avant l'achèvement des conceptions. Les routes seront réhabilitées conformément aux normes routières de résilience climatique nouvellement approuvées, et cette sous-composante financera également des audits de sécurité routière. Ces routes ont été identifiées à la fois dans les travaux d’analyses de la Banque mondiale sur la connectivité et dans la stratégie du secteur routier du gouvernement comme des routes hautement prioritaires pour la réhabilitation. La RN31 relie des zones agricoles clés, y 1|Page compris celles en cours de développement dans le cadre du projet agriculture durable par une approche paysage (PADAP) financé par la Banque mondiale (P154698), clé pour amener les produits agricoles sur les marchés toute l'année, y compris pendant la saison des pluies. La RN10 est la route principale dans la partie sud du pays, qui est la région la plus touchée par ce que les experts ont qualifié de famine induite par le climat. La RN10 relie les deux principales villes portuaires de Toliara et de Fort Dauphine, et l'ensemble de la RN10 n'est actuellement pas goudronné. La RN10 a été priorisée compte tenu de sa nature stratégique pour fournir une accessibilité toute l'année, qui est souvent perturbée en raison d'événements climatiques et d'un mauvais entretien, pour les efforts de secours et les opportunités économiques dans la région frappée par la famine. Les travaux de génie civil connexes offriront également une opportunité de soutenir l'emploi direct des populations locales y compris les femmes Sous-Composante 1.2. Acquisition de terrain pour les travaux de rehabilitation (US$13.1). Cette sous-composante financera les compensations contre argent liées à l'acquisition de terrains, aux déplacements économiques ou à la réinstallation physique d'environ 8 000 ménages affectés par le projet nécessaires pour entreprendre les travaux dans le cadre du projet (à savoir la sous-composante 1.1 et la composante 2) et pour éviter les retards potentiels dus au manque de fonds gouvernementaux. Certaines sections de la RN10 et de la RN31 pourraient nécessiter un élargissement, dont l'étendue sera déterminée à l'issue de la conception technique détaillée, tandis que d'autres sections nécessiteraient une modification mineure/localisée du tracé. Il n'est pas prévu que les terres utilisées à des fins agricoles soient affectées par le projet. • Composante 2 : Améliorer l'accessibilité et les avantages socio-économiques des routes de desserte (US$70million) Sous-Composante 2.1. Remise en état des routes de desserte régionales et communales dans les zones prioritaires et pilotage de l'entretien communautaire des routes de desserte (US$ 25 million). Cette sous-composante financera des travaux et des services de consultants pour soutenir la réhabilitation et l'entretien d'environ 250 km de routes de desserte prioritaires reliées aux routes nationales en cours de réhabilitation ci-dessus, et d'autres routes rurales importantes. Ces routes de desserte sont pour la plupart des routes en terre non classées, qui seront réparées ou transformées en routes en gravier, ce qui les rendra plus résistantes aux impacts climatiques. Les routes de desserte sont souvent essentielles pour assurer l'accessibilité du dernier kilomètre aux communautés locales. La sélection des routes de desserte prioritaires sera entreprise à l'aide d'un cadre de hiérarchisation multicritères piloté dans le cadre du projet PACT qui examine plusieurs indicateurs socio-économiques (population, pauvreté, accès rural, aléas climatiques, proximité des écoles et des établissements de santé). Cela sera soutenu par un outil d'analyse spatiale utilisant la cartographie SIG et une analyse spatiale de la situation de la pauvreté ainsi que la consultation des communautés locales, en particulier la consultation des femmes des communautés locales. Cette sous-composante soutiendra également des travaux et des services de conseil visant à piloter des microentreprises et d'autres programmes d'entretien communautaires dans le but d’assurer la réparation en temps opportun des routes locales et une meilleure fourniture d'infrastructures dans le dernier kilomètre de connectivité rurale et la création d'opportunités d'emploi pour les communautés (ciblant les femmes et les la jeunesse). Différentes modalités de supervision et contractuelles peuvent être testées : par exemple, des petits contrats avec des organisations communautaires, un contrat-cadre avec un entrepreneur local avec une période de maintenance prolongée, ou une nouvelle norme technique basée sur des matériaux et des compétences locales. Les programmes d'entretien intégreront les considérations liées aux risques climatiques et naturels, garantissant la disponibilité de la main-d'œuvre, des équipements et des matériaux pendant les saisons les plus sujettes aux inondations et autres catastrophes naturelles, et assurant ainsi la connectivité des populations vulnérables en toutes saisons. Les projets pilotes intégreront des mesures visant à 2|Page promouvoir la participation des femmes à la réhabilitation et à l'entretien des routes par le développement et la mise en œuvre d'évaluations et de plans d'action genres avec des activités claires qui contribueront à surmonter les obstacles auxquels les femmes sont confrontées dans le recrutement et la rétention, ainsi que les risques particuliers que auxquelles elles pourraient être confrontées pour avoir participé à ces activités, y compris différentes formes de violence comme le harcèlement sexuel sur le lieu de travail. Sous-Composante 2.2. Pilotage de contrats basés sur la performance sur certaines routes non revêtues (équivalent à US$ 25 million). Un contrat basé sur la performance fournit généralement une réhabilitation et un entretien des routes plus efficaces parce qu'il engage les entrepreneurs sur une période plus longue pour assurer l'état de service et la qualité des routes réhabilitées et fournit des paiements liés à la performance et à l'état des routes plutôt qu'aux quantités et aux intrants, permettant d'autres contrats contractuels. optimisations. La sélection des routes de desserte prioritaires suivra une sélection similaire à celle décrite dans la sous-composante 2.2. Cette sous-composante financera la préparation de nouveaux documents d'appel d'offres standard pour la réhabilitation et l'entretien des routes non revêtues, qui incluent des normes de performance prédéfinies en matière de résilience climatique. Quelques contrats pilotes basés sur la performance seront attribués pour couvrir la réhabilitation et l'entretien de trois à cinq tronçons routiers (environ 250 km au total), à sélectionner en fonction de leur vulnérabilité et de leur criticité climatiques pour assurer la résilience climatique du réseau de transport. La sous-composante financera également la formation du personnel du ministère et de l'agence routière sur les nouveaux contrats et financera l'équipement et les services de conseil pour superviser et mesurer l'état et la performance de la route par l'agence d'exécution conformément aux exigences des contrats. Sous-Composante 2.3. Projet pilote d'interventions sociales complémentaires le long des routes principales et de desserte (équivalent à 20 millions de dollars) Afin de maximiser les avantages socio-économiques des investissements dans les routes (routes primaires et routes de desserte), des interventions complémentaires seront incluses pour améliorer l'utilisation et les avantages des routes dans ces zones rurales, en particulier par différents groupes sociaux en situation de vulnérabilité. . Des kiosques d'information liés à Internet seront installés dans les grands centres de population de la région du projet, qu'ils soient connectés via des services mobiles ou de fibre optique disponibles dans ces endroits, pour contribuer au développement rural et remédier aux asymétries d'information telles que les prix du marché et les prévisions climatiques. Les femmes bénéficieront de manière disproportionnée de cette intervention car il existe normalement un écart entre les individus de sexes différents dans l'accès aux informations nécessaires pour tirer profit de l'agriculture. D'autres activités dans le cadre de ce paquet social comprendront des travaux communautaires pour l'amélioration d'autres infrastructures rurales sélectionnées, y compris des allées pavées, des pistes cyclables et des ponts pour piétons (et bétail) le long de chemins qui sont normalement utilisés comme raccourcis (en particulier par les femmes) pour les activités quotidiennes comme aller chercher l'eau, et l'installation de petites installations de stockage à des points clés qui peuvent faciliter les échanges et de meilleurs prix en permettant aux agriculteurs de regrouper les produits avant la collecte, de réduire les pertes dues à la périssabilité et, de cette manière, d'améliorer la résilience climatique. Une étude sera menée pour enquêter et évaluer les besoins de base, y compris pour les femmes, dans la zone du projet et pour éclairer la conception et la sélection d'investissements spécifiques en consultation avec les communautés et les autorités locales. Plus précisément, les femmes seront consultées dans des espaces sûrs et des environnements propices pour identifier leurs problèmes de mobilité uniques, leurs besoins et les caractéristiques routières qui les affectent de manière disproportionnée (c'est-à-dire des limitations de vitesse inférieures ou des voies piétonnes dégagées) et leurs contributions seront intégrées dans la conception des infrastructures. Les questions de sécurité seront également prises en compte pour intégrer une approche de conception environnementale basée sur la violence basée sur le genre afin d'éviter les facteurs de risque pour les 3|Page femmes, tels que le manque de visibilité. Le projet comprendra également une étude visant à analyser les obstacles à la participation des femmes aux travaux routiers (réhabilitation et entretien) et à élaborer des plans d'action sur l'égalité des sexes pour surmonter ces obstacles. Cela sera en outre soutenu par la conception et la mise en œuvre de programmes de formation spécifiques pour les emplois peu qualifiés (maintenance) et moyennement/hautement qualifiés (réhabilitation) afin de donner aux femmes les moyens d'accepter un travail dans le secteur, d'évaluer les processus de passation des marchés et les contrats de travaux de génie civil avec une perspective de genre pour veiller à ce que les processus et les politiques d'attribution des contrats encouragent une participation accrue des femmes et des initiatives visant à attirer des travailleuses potentielles vers les opportunités d'emploi directes du secteur routier et de sa chaîne d'approvisionnement. Cette sous-composante financera des travaux, des équipements et des services de consultants en appui aux activités susmentionnées. 4|Page • Composante 3 : Assistance Technique et Appui aux réformes du secteur du transport (équivalent à US$10 millions) La composante soutiendra les activités de renforcement des capacités et de renforcement institutionnel dans le secteur des transports dans les domaines suivants : (a) renforcement des capacités institutionnelles, réglementaires et de planification du MTP et des AR et FR nouvellement créés ; y compris sur la mise en place d'un système de gestion des patrimoines routieres résilient au changement climatique pour éclairer la planification des transports, la budgétisation et la hiérarchisation des interventions routières (entretien, réhabilitation et extension) ; (b) le renforcement des capacités sur les évaluations de la vulnérabilité climatique et les pratiques de résilience, y compris l'ingénierie et les solutions fondées sur la nature, la formation et le renforcement des capacités pour soutenir la conversion progressive de l'AR en une gestion axée sur les résultats, testant et adoptant de nouvelles approches contractuelles de maintenance (microentreprises, contrats basés sur les performances) pour une meilleure planification et gestion des infrastructures routières intégrant les considérations de résilience climatique ; et (c) la poursuite de la mise en œuvre du plan d'action de sécurité routière ; (d) le renforcement des capacités institutionnelles, réglementaires et de planification du MTP et des organismes publics rattachés ; (e) renforcer la durabilité des investissements routiers grâce à la mise en œuvre des recommandations d'une étude sur le financement du secteur routier financée dans le cadre du PDDR. Les activités nécessaires à la mise en œuvre du plan d'action VBG seront également financées à travers cette composante. Alors que le projet sera exécuté par une unité d'exécution de projet (UEP) implantée au sein de l’AR financée dans le cadre du PDDR, cette composante fournira également un soutien supplémentaire à l'UEP, selon les besoins, comme un soutien pour renforcer les capacités de gestion, de mise en œuvre, y compris les audits de projet et les activités de sauvegarde sociale et environnementale. Une étude de diagnostic sera réalisée dans l'agence routière pour comprendre les obstacles actuels à l'égalité des sexes et les opportunités dans les politiques et pratiques des ressources humaines, en mettant l'accent sur la gestion des compétences et le développement de carrière, l'évaluation des conditions de travail et les besoins pour le développement d’un vivier de talent. • Composante 4 : Composante d'Intervention d'Urgence Contingente (US$ 0) Cette composante facilitera l'accès à un financement rapide en permettant la réaffectation des fonds de projet non engagés en cas de catastrophe naturelle, soit par une déclaration formelle d'urgence nationale, soit à la demande formelle du gouvernement. À la suite d'une crise ou d'une urgence éligible, le gouvernement peut demander à la Banque mondiale de réaffecter les fonds du projet pour soutenir l'intervention d'urgence et la reconstruction. Cette composante tirerait parti des ressources non engagées d'autres composantes du projet pour couvrir les interventions d'urgence. Un manuel du CERC et un plan d'action d'urgence, acceptables pour la Banque mondiale, seront préparés et constitueront une condition de décaissement pour cette composante. D. Indicateurs de résultats Les indicateurs de résultants servant à mésurer la réalisation de l’ODP sont : • Nombre de population rurale ayant accès à une route praticable en toutes saisons ; • Nombre de femmes rurales ayant accès à une route praticable en toutes saisons ; • Durée du trajet sur la RN10 de Toliara à Ambovonbe ; • Durée du trajet sur la RN31 entre Mangoaka et Bealalana ; • Durée des perturbations du trafic routier par an sur la RN10 dues aux événements météorologiques ; • Pourcentage des routes en bon état par rapport à la longueur totale des routes ; 5|Page 2. Aperçu du Pays et du Marché A. Contexte opérationnel 1. i. Caractéristiques générales Madagascar possède une superficie d’environ 578 000 km2 et a une population en croissance rapide de 24,5 millions d’habitants. Près de 80 pour cent de la population de Madagascar réside en milieu rural et les taux de pauvreté rurale sont plus de deux fois plus élevés que les taux de pauvreté urbaine. La faiblesse de la connectivité rurale et les politiques gouvernementales défavorables ont fait que les rendements agricoles ont baissé. C’est également un facteur contribuant au faible accès aux services de soins de santé en milieu rural de Madagascar. Le réseau de routes secondaires, qui est essentiel pour relier les routes nationales principales aux routes rurales, a longtemps été négligé, causant un faible accès des zones rurales. Etant un facteur parmi d’autres, la faiblesse de la connectivité routière constitue un obstacle à l'amélioration des résultats scolaires. Bien que les routes constituent le principal mode de transport à Madagascar, la densité routière est faible et près de 17 millions d’habitants du milieu rural sont déconnectés du réseau, ce qui les isole des marchés et des services sociaux. Par ailleurs, le nombre élevé de trafics sur les réseaux routiers ainsi que les transporteurs des marchandises qui ne respectent pas les charges maximales autorisées accélèrent leurs dégradations et accroissent les coûts d’entretien et de réhabilitation. 2. ii. Aspects institutionnels Dans le cadre actuel de la décentralisation, les autorités locales sont responsables des réseaux de routes provinciales (RP) et de routes communales (RC), mais elles ne disposent ni des capacités ni des ressources nécessaires pour les gérer. Les dépenses publiques consacrées à la réhabilitation et à l'entretien des routes sont extrêmement faibles. La fragmentation de la structure institutionnelle est actuellement en cours de recentrage à travers des nouvelles législations et règlementations ayant transformée l’ARM en Agence Routière (AR) et le FER en Fonds routier (FR). 3. iii. Aspects socio-économiques Après une période de stagnation économique suite à la crise politique de 2009-2013, Madagascar est entré sur une trajectoire de croissance. Cependant, la croissance ne s'est pas traduite par une réduction significative de la pauvreté. Madagascar fait toujours partie des pays les plus pauvres au monde avec un taux de croissance annuel du PIB 2020 de -7,1 %1 un taux d’inflation 2020 : 4,19 %2. En outre, selon la note sur les Perspectives économiques de Madagascar, Banque Mondiale, décembre 2020, relative à la pandémie, « près de 1.4 millions de personnes ont basculé dans l’extrême pauvreté en 2020 en raison des pertes d’emplois dans les secteurs clés de l’industrie et des services ». Une contraction du PIB de 4,2% en 2020 a été observée. La croissance, toujours selon la note, devrait être aux environs de 2% en 2021 et à 5,8% en 2022. Par ailleurs, la crise sanitaire a encore fragilisé l’économie malgache, plusieurs notes élaborées mentionnent les impacts du covid-19 sur l’économie de Madagascar. Selon les « Perspectives économiques de Madagascar (Traces la voie de la reprise), déc 2020, Banque Mondiale », la pandémie de COVID-19 a brutalement plongé le pays dans une 1 Source : Base de données sur les comptes nationaux (sept. 2021) 2 Source : NIPC 2020 6|Page profonde récession, annulant près d’une décennie de croissance du PIB par habitant. Selon également la note sur l’impact du Covid-19 sur l’économie de Madagascar, Scénarios et recommandations, PNUD, avril 2020, des risques majeurs peuvent faire surface avec toutes ses conséquences. Des recommandations ont été formulées et seront ajustées au fur et à mesure de l’évolution de la crise. Toutefois, si la crise sanitaire a contraint l’Etat Malagasy à fermer la frontière empêchant le mouvement de personnes, elle a été réouverte, d’une manière progressive, au mois de novembre. Ce qui pourrait permettre sous certaines conditions, aux Consultants internationaux ou personnels des entreprises à entrer à Madagascar. Une autre crise post-covid et non des moindres a été constaté, c’est la hausse du fret maritime. On note dans la période du mois de septembre 2021 une hausse de 316%, Source Midi Madagasikara du 14-09-2021. Les prix des billets d’avion aussi a connu une nette augmentation, à titre d’exemple, en novembre 2021, les prix de billets d'avion au départ de France a augmenté de 5,9% par rapport à novembre 2019. Ces prix risquent encore de connaître une flambée en 2022 étant donné que le prix du baril de pétrole augmente, Le kérosène devrait être bientôt taxé, les carburants durables coûtent beaucoup plus cher que le kérosène. Ce qui démontre que l’économie malgache est fragile et risque d’être fragilisée encore plus. Toutefois, face à ces constats, le gouvernement a affirmé sa volonté de redresser l’économie à travers différents plans de développement. La sécurité routière constitue un défi émergent qui pour l’instant ne trouve pas de réponse cohérente. 4. iv. Données sectorielles Les infrastructures de transport, tous modes, sont en général en mauvais états particulièrement les infrastructures routières. Bien que les routes constituent le principal mode de transport à Madagascar, la densité routière est faible et près de 17 millions d’habitants du milieu rural sont déconnectés du réseau, ce qui les isole des marchés et des services sociaux. Le réseau de routes rurales, qui est essentiel pour relier les routes nationales principales aux routes rurales, a longtemps été négligé, causant un faible accès des zones rurales. La faiblesse la connectivité rurale est un facteur contribuant au faible accès aux services de soins de santé en milieu rural de Madagascar. Etant un facteur parmi d’autres, la faiblesse de la connectivité routière constitue un obstacle à l'amélioration des résultats scolaires. 5. v. Aspects technologiques Même si dans l’ensemble la connectivité Internet mobile est faible (33%) dans le pays, la plupart des habitants en milieu rural des districts ciblés par le projet ont accès à l’Internet haut débit à travers des services 3G et 4G. On note quatre fournisseurs d’accès internet à Madagascar, à savoir Blueline, Orange, Airtel et Telma. Malgré leur présence, Madagascar compte parmi les pays du monde qui n’ont pas encore démocratisé leur connectivité au web. Selon les chiffres de la Banque Mondiale, il n’y avait que 404 988 internautes sur l’île Rouge en 2011, soit 1,90% de la population, ce qui place le pays 43e sur les 54 pays d’Afrique et 168e sur les 195 pays au monde. A noter que ce nombre était de 501 internautes en 1996. Les abonnés haut débit, quant à eux, étaient 6 800 la même année, soit 0, 03% de la population. Toutefois, la Worldwide Broadband Speed League a publié son rapport 2018 sur la vitesse de téléchargement par pays dans monde. En Afrique, c’est Madagascar qui se trouve à la première place avec sa vitesse de téléchargement de 24,87Mbps et se classe 22ème mondial. Il semble que cette performance découle du démarrage par Telma du 7|Page déploiement d’un backbone de fibre optique à travers le pays, pour renforcer davantage la connectivité à haut débit. Les grandes villes des 23 régions de Madagascar sont couvertes par les réseaux mobiles cellulaires 2G, 3G, 4G et 5G à travers les trois opérateurs mobiles Telma, Airtel et Orange et bénéficient des services qui sont offerts. Avec la récente augmentation de la pénétration des services de technologie de l'information et de la communication (TIC), il est possible de tirer parti de solutions numériques peu coûteuses pour améliorer la connectivité et les moyens de subsistance en milieu rural. Par ailleurs et non des moindes, le Gouvernement Malagasy a fait une de ses prioririté l’amélioration du climat des affaires et faciliter les investissements. Cela implique la mise en œuvre de réformes légales, réglementaires et procédurales afin d’accélérer les délais de traitement et de faciliter les procédures administratives. Une réforme d’envergure a alors été lancée depuis plusieurs années afin de mettre en place un système d’e- gouvernance qui mènera Madagascar vers la digitalisation de son administration publique. L’Etat Malagasy, à travers un projet financé par la Banque Mondiale continue la mise en conformité des infrastructures des marchés aux standards internationaux. 6. vi. Aspects Environnementaux et de développement durable L'extrême vulnérabilité de Madagascar au changement climatique exacerbe la faiblesse de la connectivité des transports et la pauvreté. Presque chaque année, le pays est touché par des phénomènes climatiques extrêmes, tels que cyclones et inondations, qui occasionnent des pertes économiques considérables. Les infrastructures de transport mal conçues ou sous-entretenues sont particulièrement vulnérables et sont facilement emportées par les eaux, occasionnant des coûts supplémentaires de redressement et des coûts dus aux perturbations de l’économie. En 2010, environ 60 pour cent des ménages extrêmement pauvres ont été affectés par un événement catastrophique ou une combinaison d'événements catastrophiques (cyclones, inondations, sécheresses, invasions de criquets pèlerins, maladies des plantes, etc.) qui ont affaibli leur bien-être économique. 7. vii. Cadre de passation de marchés du pays Un Code des marchés publics a été promulgué en juillet 2004 puis une version récente proposant des améliorations et quelques amendements est sorti en 2016. Ce code prévoit une simplification des procédures et le respect des normes internationales. Le Code des marchés publics a également été complété par des règlements, des manuels de procédures, des dossiers appels d’offres types et d’autres documents de passation de marché. Les marchés relatifs à l'opération envisagée seront passés conformément au règlement de la Banque mondiale en matière de passation des marchés pour les emprunteurs dans le cadre de financement de projets d'investissement - Passation de marché en financement de projets d'investissement : Biens, travaux, services de conseil et autres que de conseil du 1er juillet 2016 et les dispositions stipulées dans l'Accord de financement. En outre, les Directives du 15 octobre 2006 sur la prévention et la lutte contre la fraude et la corruption dans les projets financés par des prêts de la BIRD et des crédits et subventions de l'IDA et leurs révisions de janvier 2011, s'appliqueront. Conclusions clés : Au vu de ce qui précède, malgré la crise sanitaire qui prévaut encore, on peut conclure que le contexte opérationnel est plutôt favorable à la bonne réalisation du projet. Ceci a été observé lors de la mise en œuvre des constructions des routes dans le cadre du Projet d’Appui à la Connectivité des Transports. 8|Page La mise à profit de l’expertise technique des partenaires du Ministère, des projets et programmes des différentes directions techniques renforcera la bonne mise en œuvre du projet et d’atteindre l’ODP visé. B. Capacité du client et de l’Unité de Coordination de projet (UCP) 8. i. Identification de l’Acheteur L’Unité de Coordination du projet (UCP) placé au niveau de l’Agence Routière qui agit pour le compte du Ministère des Travaux Publics, (MTP), est responsable de la mise en œuvre, la gestion des contrats, la coordination et le suivi de toutes les activités des composantes 1 et 3 du projet. Tous les contrats de dotation en personnel de l’UCP et pour la mise en œuvre du projet (entrepreneurs en travaux, fournisseurs de biens, consultants et sociétés de conseil) seront signés par le Coordonnateur du projet. Les entités techniques nationales concernées, grâce à leur implication active, soutiendront l’UCP dans la mise en œuvre du projet par le biais de dispositions à prendre avec l’UCP, comme indiqué ci-dessous. L’Agence routière sera techniquement impliquée dans les Composantes 1 et 3. L’AR participera à la passation de marchés avec des entrepreneurs pour les travaux et des consultants pour le contrôle des travaux (les entrepreneurs et les consultants sont recrutés par l’UCP). L'Agence routière participera également et activement à la mise en service des travaux. Les autorités locales (district et communes) des Régions concernées seront impliquées techniquement pour les deux composantes. Avec l’appui des directions régionales du MATP, les autorités locales participeront activement à la planification des interventions sur les réseaux routiers provinciaux et communaux. 9. ii. Besoin d’accompagnement/d’assistance Compte tenu de la mise en vigueur du nouveau Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement 4ème édition du mois de novembre 2020 des formations, le renforcement de capacités en matière de passation de marchés est vivement souhaitable (STEP, nouvelle réglementation, gestion de contrats) pour du personnel du projet et celle de l’Agence Routière. 10. iii. Système de gestion des plaintes et résolutions de conflits Selon les règlements de Passation de Marchés de la Banque Mondiale, d’une manière générale les différentes plaintes connues dans des projets similaires ont été traitées convenablement. L’appropriation de la procédure de traitement des plaintes est effective. Le Ministère dispose un système acceptable relatif à gestion des plaintes. Ce système de traitement de plainte sera inséré dans le manuel de procédures du projet, conformément à la nouvelle réglementation applicable. 9|Page C. Etudes et Analyse de l’état du marché c.1 Identification des marchés Le nombre de marchés est d’environ 46 pour les dix-huits premiers mois d’activité. Les activités du Projet peuvent être groupées dans des catégories de marchés ou segments de marchés. La répartition par type d’activités des marchés, objet de la mise à jour à engager, est comme suit : Montant TYPE D’ACTIVITES Nombre % budget (x1000USD) Consultant 33 14 105 3,710% Assistance informatique 1 10 0,003% Assistance technique en appui à la mise en œuvre du Projet 14 3 171 0,834% Audit 1 100 0,026% Contrôle et supervision des travaux routiers 1 1 000 0,263% Etudes, Contrôle et surveillance des Travaux BTP 7 4 758 1,251% Formation et renforcement de capacité 3 665 0,175% Etudes d'impact environnemental et social / M.O.I.S. / Communication / Audit / Mise en œuvre VBG 4 920 0,242% Maîtrise d'Œuvre Institutionnelle et Sociale (MOIS) 2 3 482 0,916% Fournitures 3 350 0,092% Equipements mobiliers 3 350 0,092% Travaux 9 365 694 96,184% Travaux Routiers 6 361 400 95,055% Travaux bâtiments 3 4 294 1,129% Services autres que services de Consultants 1 52 0,014% Appui aux maîtrises d'œuvre institutionnelle et Sociale 1 52 0,014% 100,000 Total général 46 380 201 % On peut en conclure que : • Les travaux routiers représentent à eux seuls 95% du montant total des activités ; • Les travaux de bâtiments représentent 1.1% montant ; • Les marchés d’Etudes, de Contrôle et surveillance des travaux en général ne constituent que 1,5% du montant total. En utilisant la loi de Pareto, l’analyse effectuée montre que 2 marchés de travaux (RNS10 et RNT31) représentent dans les 80% du budget concerné. c.2 Etude du marché Une analyse synthétique des marchés du projet par catégorie des marchés sont effectuées dans les paragraphes qui suivent. Les prestataires cibles pour les marchés prévu à passer sont en général les entreprises, les fournisseurs, les bureaux d’études et consultants individuels, centres de formation principalement ceux spécialisés dans les domaines : - Travaux publics et infrastructures / équipements routiers ; - Travaux de construction de bâtiments ; - Développement rural, mobilisation sociale, Marketing social, l’étude d’impact environnemental, Gestion et management ; - Sécurité routière ; - NTIC ; 10 | P a g e A Madagascar, les entreprises du secteur BTP sont globalement segmentées en grandes, moyennes et petites entreprises. Elles sont classées en fonction de leurs capacités matérielles, financières et humaines. On observe que les grandes entreprises soumissionnent principalement en tant qu’entrepreneur principal, les moyennes et les petites entreprises interviennent en tant que sous-traitants. Les éléments identifiés après analyse des forces et faiblesses (facteurs internes au projet et à l’environnement) ainsi que les opportunités et les menaces (facteurs externes au projet), présentés en annexe, sont présentés sous la forme de la matrice SWOT ci-après : Interne à l’Organisation et à l’Environnement FORCES FAIBLESSES - Bonnes pratiques avec les précédentes missions - Difficulté dans la définition des besoins et la en permettant d’une manière optimale de faire des rédaction de certains TdRs/spécifications pour les allotissements des marchés, la stratégie de prestations assez spécifiques ; marchés, la définition des besoins, l’approche ainsi que les leçons tirées des certaines mauvaises - Plan de charge assez élevé de l'équipe fudiciaire et expériences technique (observations générales pour la plupart des projets) ; MTP et Agence Routière - Expériences dans la mise en œuvre des projets de - Connaissance non approfondie du nouveau complexités similaires : projets gérés au niveau de Règlement de Passation de Marchés (observations l’AR, PUPIRV … financements BM, UE, BAD… ; générales) ; - Flexibilité et capacité à gérer des missions complexes ; - Capacités fiduciaires et de passation de marchés à - Expériences du MTP dans la gestion des travaux de renforcer compte tenu de la charge de travail ; grandes envergures. Par exemple : Projet PACT : RN44, RN12A, Station de pesage ; - Coûts relativement élevés de l’énergie (électricité, - Capitalisation des acquis dans la gestion du Projet, carburant) de la communication internet à passation de marchés : élaboration des TDR, Madagascar ; évaluation des offres et propositions ; - Appui de l'équipe du MATP ayant des expériences dans la mise en œuvre des travaux routiers, MROR, HIMO mécanisé Externe à l’Organisation OPPORTUNITES MENACES - Les marchés de montants élevés sont attractifs - Impact du Covid-19 sur l'ensemble du processus pour les entreprises internationales (particulièrement pour les prestataires à l'étranger) : difficulté de mise en œuvre, - Existence des prestataires locaux et réouverture progressive de la frontière (conditions internationaux pour tous types de marchés : d’entrée à Madagascar pouvant être • Exécution des travaux routiers, bâtiments, contraignantes) ; • Études / contrôle et surveillance des travaux, • EIES, MOIS, RDC… - Impact des nouvelles dispositions EAS / HS : coûts • Fournitures en matériels informatiques, induits, retards, disqualification d'entreprises téléphoniques, consommables ... compétentes, non maîtrise des dispositions par les parties prenantes ... ; - Marchés très diversifiés offrant des opportunités d’affaires pour tous types d’entreprises se trouvant - Difficultés pour une même entité d’intervenir pour à l’international que localement (Consultants des marchés dans des zones très éloignées les firmes et individuels, entreprises des travaux, unes des autres (exemple : cas EIES - MOIS RN9 et fournitures …) selon des procédures d’attribution RN12A au niveau de l’Agence Routière) ; respectant les principes fondamentaux de passation de marchés, financements crédibles, - Surcharge de travail pour les firmes attributaires, paiements avec risques quasi nuls, problèmes d’acheminement ou disponibilité des matériels, disponibilité de certains experts, - Ouverture des frontières favorisant les flux des personnels ; personnes avec d’autres pays notamment les Consultants internationaux et les mains d’œuvre - Difficultés pour les Consultants Firmes à trouver nécessaires des Experts différents pour des missions en parallèles (lors de la préparation des soumissions - Renforcement de capacités des Agents de l’Etat ou pendant l’exécution) ; (du MTP, MTM, des acteurs dans la gestion des routes comme l’Agence Routière, le Fonds Routier, 11 | P a g e Externe à l’Organisation OPPORTUNITES MENACES - Capacité des carrières disponibles / Augmentation prix des matériaux / Plaintes sur l'attribution des marchés ; - Hausse du coût du fret maritime (316% au mois de septembre 2021) affectant principalement les fournitures à l’extérieur ; - Mauvaise compétence des Prestataires ; - Décaissements faibles au début du Projet et souvent élevés dans la phase de réalisation des travaux ; - Sous-estimation financière des offres ou élevée selon la méthode adoptée ; - Non disponibilité éventuelle de consultants pour certaines prestations ; - Existence de produits de contrefaçons et/ou de mauvaise qualité 11. Travaux Les activités s’adressent à des Entreprises spécialisées dans le domaine des travaux publics (travaux routiers, génie civil, ouvrages d’arts) et des bâtiments (station de pesage, bâtiments administratifs et techniques / exploitation, hangars et ateliers3. Les entreprises locales possèdent la capacité de soumissionner sur des appels d’offres de grandes envergures ainsi que pour d’autres segments de marchés. Nous pouvons citer entre autres les entreprises ci-après : Travaux Routiers : SOGEA, CSCEC, SINOHYDRO, CGC, CRBC, WEITC DAYU, COLAS (encore sous exclusion des financements de la Banque Mondiale), SMATP, ECE , OTI, DYNAMICS, EIFFAGE, DAIHO … Travaux des bâtiments : SOGEA, OTI, METALLIKIT, SCB, STMB, ECE, CONSTRUCT, SCB, TECHNIBAT, ABC CONTRUCTION, ARCHICONCEPT, Tan 2000,… Les appels d’offres passés par le Projet, du MATP et de ses Organismes rattachés justifient l’existence des entreprises qualifiées afin de réaliser les travaux envisagés. La pratique de sous-traitance est généralement utilisée dans le cadre de la promotion des PME leur permettant ainsi d’avoir accès aux grands marchés et améliorer leurs qualifications respectives. 12. Fournitures L’analyse a fait ressortir trois segments possibles regroupant d’autres sous segments encore plus précis. Des fournisseurs dans les domaines ont été identifiés et donnés à titre d’exemple. Les fournitures catégorisées en trois segments ci-après : Equipements mobiliers 3Hormis les entités figurant dans la liste d’exclusion de la Banque Mondiale : https://www.worldbank.org/en/projects-operations/procurement/debarred-firms 12 | P a g e • Matériels de transport s’adresse uniquement à UNOPS. • Matériels informatiques, bureautiques, mobiliers de bureau : plusieurs fournisseurs locaux interviennent dans le domaine, entre autres BRICOBAT, MALGADECOR, SODIM, ITET, CLINIC INFO, IMM INFO, CANDY, HANDY, TEKNET, SMARTEO, NTIX, COMPUTECH, HK MEDIA, NEXTHOP etc Pour chaque fourniture spécifique, diverses spécifications techniques sont disponibles sur les marchés locaux, suivant le rapport qualité/prix. Il s’avère toutefois faire preuve de vigilance sur les produits de contrefaçons et de mauvaises qualités qui inondent le marché. Remarques générales : Il est à noter que toutes fournitures importées risquent une augmentation des prix étant donné la flambée des coûts actuellement. 13. Consultant Concernant les prestations de service, le marché local dispose des consultants qualifiés capables de réaliser les activités prévues dans le cadre du projet. Ils ont également la capacité à soumissionner sur les marchés de consultance nécessitant des expériences internationales. Pour les Etudes et Contrôle et Surveillance Travaux routiers : CIRA, ASA TARATRA, SETEC INTERNATIONAL, STUDI INTERNATIONAL, HYDROARCH, OTCE INFRA, TECMAD, EGIS INFRAMAD, TECHNIPLAN, BRL, DAVINCI, SYSTRA … Ils peuvent se constituer en groupement avec d’autres entités telles que : MEG, GEO ECO CONSULT, Groupement 4SL, AFID, GAACE GmbH, FICOMA … En études de bâtiments (gares, bâtiments d’exploitation / commercial / administratif, hangars, ateliers, stations de pesage …) : plusieurs cabinets d’études et / ou d’architectures sont disponibles à Madagascar : Bureau d’études JARY, ACAD, Trano, A2D, MEC, SEAP, SERT, les bureaux d’études mentionnés pour les études des travaux routiers ci-dessus peuvent également participer au processus de sélection Pour les Etudes d’Impact Environnemental et Social, VBG, mobilisation sociale, MOIS : Savaivo, AEQUO, BRL, CIRA, EGIS, CEExI, Biodev, GLW, BIOTOP, INSUCO, LAND RESSOURCES, Artelia …. Toujours dans le cadre des études d'impact environnemental et social / M.O.I.S. / Communication / Audit environnemental / Mise en œuvre VBG mais ayant recours aux Consultants individuels, il pourrait s’avérer nécessaire de demander auprès des Cabinets spécialisés les consultants qualifiés et établir les listes restreintes sur cette base. Les registres des Projets existants peuvent également être utilisés. Pour le cas des prestations de renforcement de capacité et de formation, le Projet peut s’adresser, selon les thèmes ou besoins identifiés aux Consultants individuels, Consultants firmes comme les cabinets en gestion, des Instituts ou universités ou centre de formation à l’extérieur. Particulièrement, pour les prestations de renforcement des capacités pour tester et adopter de nouveaux régimes d'entretien (micro-entreprises, contrats basés sur la performance) pour une meilleure planification et gestion des infrastructures routières, le Projet envisage de passer le marché avec ININFRA ou Institut National de l’Infrastructure qui est la seule entité fournissant lesdites prestations à Madagascar, d’autant plus que le faible montant ne requiert pas une concurrence ouverte à l’internationale. Dans le cas où le Projet aura besoin de services tels que l’assistance en informatique, au niveau du marché local, plusieurs fournisseurs sont identifiés entre autres OPTIMUS Technology, Mada-informatique, CODEUR MADAGASCAR, Netapsys, HighPerfectSERVICE, MMC Madagascar, Madasoftware, Zamitech, Optimus Offshore Madagascar, Info Media Center, iCone, Service Info Net, ilo madagascar, CybAirMAX, 13 | P a g e Teknet Group, Misaina Virtuel, Portoloin, etc. Le Projet peut s’adresser également à des Consultants individuels qui sont faciles à trouver à Madagascar. En conclusion, pour l’ensemble, les passations de marchés passés par le Projet justifient l’existence des Firmes (entreprises, bureaux d’études, ONG, Consultants Individuels) qualifiés afin de réaliser les activités envisagées. 14. Services autres que services de Consultants Les prestations concernent principalement les recrutements des agences d’exécution chargées des paiements des indemnités relatives aux PARs. Plusieurs agences de micro finances sont présentes à Madagascar. Dans le cadre des activités de mêmes genres, le Projet peut faire appel à des ONG et Associations locaux (cas du FID pour les activités Vatsin’ankohonana), ou bien utiliser les mobiles money (cas du projet PURSAPS - BVPI dans les activités de Teracing) ou des agences de microfinances pouvant offrir leurs services dans les zones des projets. Le Consultant chargés des missions de maîtrise d’œuvre sociale dans les zones des travaux appuiera le Projet dans l’élaboration des spécifications techniques ou TDR ainsi qu’a l’identification desdits Agex pour éviter les risques tels que détournement des fonds, indisponibilité des fonds dans leurs caisses au moment des indemnisations, la sécurités des fonds etc. Dans le cas présent, le choix s’est porté sur le recours aux services d’institutions de microfinance pouvant réaliser les prestations. Nous pouvons citer entre autres : ACEP, APEM, CECAM, MADA CREDITO, Réseaux OTIV, PAMF4 … En effet, l’utilisation des ONG / Associations locaux présentent des risques de détournements ou vols, l’utilisation de mobile money a déjà subi les mêmes expériences et a présenté des problèmes de retards de paiement. Lesdits risques sont moindres pour les services des institutions de microfinance mais à condition que les agex soient bien encadrés par le Consultant MOIS et de faire un choix approprié (services fournis, réputation …). 15. Autres : Pour les Contrôles techniques obligatoires relatifs à l’Assurance couvrant la responsabilité décennale, nous pouvons citer : Socotec, Dekra, Apave ou Bureau Veritas. c.3 Justification des allotissement et séparation des activités en marchés L’allotissement et séparation des activités ont été basés sur les aspects, sans être exhaustifs, ci-après : - Conditions géographiques ou éloignement des sites d’intervention ; - Coûts des activités ; - Facilité de gestion ; - Obtention de résultats palpables et mesurables dans un délai plus réduit ; - Les bonnes expériences passées du MTP, de l’AR, Projets similaires (PACT, PUPIRV…) ; - Les leçons tirées des mauvaises expériences ou échecs ; - Des conditions semblables d’exécution. Pour les travaux, la RN31 et RN10, dans le stade actuel des deux activités, étant donné que les études sont en cours, il n’est pas encore possible d’allotir respectivement les deux marchés. Par ailleurs, les deux sites sont éloignés et leurs programmations peuvent différées pour être combinés. 4 http://www.apimfmada.mg/index.php/imf-membres 14 | P a g e En tenant compte des expériences pour des prestations exécutées dans des conditions semblables, il est plus pertinent de séparer les activités. C’est le cas notamment des Etudes d'impact environnemental et social / M.O.I.S. A titre d’exemple, des prestations ont été confiées à un seul prestataire au niveau de la RN9 et RNT12A entrainant ainsi des problèmes de gestion dans leurs exécution (gestion des consultants, planning et programmations...) 15 | P a g e 3. ANALYSE DES RISQUES LIES A LA PASSATION DE MARCHES Plusieurs risques ont été identifiés avec leurs probabilités d’occurrence respectives. Lesdits risques ainsi que les mesures d’atténuations pour y remédier sont résumés dans les tableaux ci-après Services de consultant Type de Méthodes d’atténuation du Détenteur Risques marchés risque du risque - Pour - TDR mal élaborés / manquants de - Implication des acteurs UGP l’ensemble précisions / spécifications pas assez concernés dans le processus : Consultant des bien identifiées / retard dans élaboration des TDR, élaboration AR prestations l'élaboration / besoins DP, évaluation, négociation et de incompatibles, mal définis ou faire des suivis rigoureux, Consultant inappropriés Objectifs à bien définir dans les s - Contraintes imposés par l'existence TDRs de Covid 19. Réouverture encore - Elaborer des critères de progressive de la frontière qualification adéquats / - Plaintes : LR, clauses et articles des DP, catégorisation de prestataires / attributions, pendant exécution, plan de charge des prestataires résiliation … / respect du planning - Rigueur dans l'élaboration des spécifications techniques, des besoins réels - Bien identifiés les objectifs à atteindre et les résultats attendus lors de l'élaboration des TDR ainsi que les cibles particulièrement pour les renforcements des capacités - Tenir compte des impacts du Covid sur les critères : disponibilité des consultants à l'étranger - Capitalisation des acquis (MATP, …) lors des précédentes missions similaires, exécution du marché, validation des études partielles … - Validation des résultats partiels à prévoir dans les TDR - Implication de tous les acteurs durant l’élaboration des documents, identifier et pallier les lacunes - Assistance - Qualité du Candidat due au nombre - Mettre l'accent particulièrement UGP AR informatiqu élevé de Consultants (activités sur l'élaboration des critères de Consultant e informatiques) qualification des Consultants - Assistance - Définition de prix arbitraire par la - Négociation technique firme - Capitalisation des acquis avec le en appui à - Indisponibilité de Consultants projet en cours (ex PACT, ….) la mise en locaux ayant déjà élaborer ou - Négociation œuvre du participer à l'élaboration de PPSD - Communication adéquate Projet - Proposition financière relativement - Cadre de gestion de plainte élevée dans le cas de consultants à efficace mis en place l'étranger - Suivi rigoureux des plannings - Ingérence des autorités locales - Adapter les TDR existants de Compensation sociale et l'Expert VBG / VCE au besoin de environnementale retardée (non l'EAS / HS disponibilité du Fonds - Ne pas attendre le délai critique Gouvernement) pour le lancement - Rôle du CPRD flou, besoin mal - Mener à bien la négociation exprimé ou identifié - Exiger la maîtrise du Cadre - Dispositions relatives aux EAS / HS Environnemental et Sociale mal appliquées (CES) de la Banque mondiale. - Recrutement retardé - Retard dans l'attribution du Contrat 16 | P a g e Type de Méthodes d’atténuation du Détenteur Risques marchés risque du risque - Routine dans l'exécution - Formation inadéquate - Evaluation post-formation non satisfaisante - Non maîtrise du nouveau Cadre Environnemental et Sociale (CES) de la Banque mondiale. - Audit - Retard d'attribution - Ne pas attendre le délai critique UGP AR pour le lancement du processus Consultant - Contrôle et - Approche non maîtrisée (MEROR) - Former les acteurs dans AR - UGP - supervision Critères de sélection inappropriés l'approche MEROR Consultant des travaux routiers - Etudes, - Approche HIMO non maîtrisée - Exiger la qualification HIMO pour Bénéficiaire Contrôle et - Etudes ne prenant pas en compte certains personnels clés s Autorité surveillanc des aspects importants du projet - Capitaliser l'acquis de Bureaux e des - Etudes mal faites l'Administration, de l'AR durant d'études et Travaux - Ingérence des autorités locales la conception et la mise en Entreprise BTP - Barrières sanitaires imposés par œuvre de l'Approche l'existence de Covid 19 - Capitaliser l'expérience acquise - Approche MEROR non maîtrisée sur les AO précédents : Bien - DAO mal fait organiser l'acheminement des - Conseil en supervision inapproprié matériaux et matériels vers les - Critères de mesure inadéquats sites, tenir compte du facteur - Augmentation des prix des climatique (saison des pluies) matériaux de construction sur le marché local - Spécifications techniques incomplètes ou mal élaborées - Mauvaise organisation sur l'acheminement des matériels vers les chantiers - Exécution travaux pendant la période des pluies - Etudes ne prenant pas en compte des aspects importants du projet - Etudes mal faites - Etudes - Ingérence des autorisés locaux - Capitaliser les acquis des UGP AR d'impact Etudes et exécutions mal élaborées précédentes missions similaires Consultant environne ou ne prenant pas en compte tous - Exiger la maîtrise du Cadre Autorités mental et les aspects requis Environnemental et Sociale Bénéficiaire social / - Compensation sociale et (CES) de la Banque mondiale. s M.O.I.S. / environnementale retardée - Bonne communication des Communic - Non maîtrise du nouveau Cadre enjeux des prestations ation / Environnemental et Sociale (CES) - Le Consultant devra disposer Audit de la Banque mondiale. d'une expérience probante en environne Audit et évaluation de PR (pour mental / ce type de prestation) Mise en - Le Consultant devra disposer œuvre VBG d'une expérience probante en - Maîtrise formation EIES d'Œuvre - Stratégie de communication Institutionn adéquate (approche par thème elle et ou par cible, média principal et Sociale d'appoint, canaux de communications, messages ...) - Assistance - Besoins mal identifiés - Implication d’un panel de la UGP AR technique - Retards des livrables population cible durant les Consultant en appui à missions la mise en - Capitaliser les acquis (mapping), œuvre du utiliser l’entente directe si Projet prestations avec PACT (études sur satisfaisantes les genres, - Mettre les Consultants dans les identifcatio meilleures conditions n de d’exécution de leurs prestations projets …) (informations complètes, précisions sur les interventions 17 | P a g e Type de Méthodes d’atténuation du Détenteur Risques marchés risque du risque demandées, pertes de temps unitiles …) - Formation - Formation inadéquate - Capitalisation des acquis au UGP et - Evaluation post-formation non niveau du MATP (Travaux Consultant renforceme satisfaisante MEROR) Communes nt de - Manque de pratiques - Formation des formateurs ININFRA, capacité - Indisponibilité des consultants - Bonne planification de la Centre de formateurs formation, négociation Formation Fournitures et services autres que services de consultant Type de Méthodes d’atténuation du Détenteur Risques marchés risque du risque - Pour - Augmentation du fret maritime - Capitaliser l'expérience acquise Fournisseur l’ensemble (316% au mois de septembre 2021 sur les AO précédents s des – Source 14-09-2021 par Midi (spécifications techniques…) fournitures Madagasikara) - Bonne planification des à importés - Augmentation des prix des acquisitions, études des coûts et matériaux de construction sur les optimisation des ressources marchés locaux (groupage, magasinage …) - Augmentation des prix des matières identification des solutions premières - Variation du coût de optimales transports - Mettre des critères de - Délai de transit/dédouanement non qualification appropriés maîtrisé - Bien définir les modalités de - Spécifications techniques réception et de livraison incomplètes ou mal élaborées - Prévoir la clause sur la possibilité - Manque de vérification de d’augmenter les cautions conformité (qualitative et - Implication de tous les acteurs durant l’élaboration des documents, quantitative) lors de livraison et de identifier et pallier les lacunes réception de ballasts - Modalités de livraison mal définies - Manque de disponibilité de carrière conforme aux besoins - Plaintes : LR, clauses et articles des DAO, DC, attributions, pendant exécution, résiliation … - Matériels - indisponibilité des véhicules - Ne pas attendre le délai critique UGP AR et de pour passer la commande UNOPS transport - Equipemen - Produits de mauvaise qualité ou - Bien définir les matériels par MTP et ts mobiliers contre façon, Matériels de rapport aux besoins Fournisseur contrefaçon, non authentiques - Exiger des certificats - Besoins mal définis d'authenticité - Coûts mal définis : frais des - Caution de garantie transports, dédouanements, - Bien cadrer les spécifications - Besoins mal exprimés techniques par rapport aux - Matériels non disponibles sur le besoins réels et des matériels marché existant sur le marché - Spécifications techniques non précises / mal élaborées / besoins mal définis - Variation du coût de transports - Délai de transit/dédouanement non stable - Produits de mauvaise qualité ou contre façon Type de Méthodes d’atténuation du Détenteur Risques marchés risque du risque - Appui aux - Mauvaise qualité des prestations de - Bien choisir les prestataires UGP – AR – maîtrises l'AGEX de paiement parmi ceux existants : appui du AGEX – d'œuvre Consultant chargé des missions Consultant institutionn MOIS (élaboration des TDR, MOIS 18 | P a g e elle et - Détournement des fonds par l'AGEX termes des contrats, suivi des Sociale ou autres tiers, indisponibilité des paiements …) (Services fonds au moment de l’indemnisation - Prospection et études des autres que - AGEX ne disposant pas les services fournis et réputation services de ressources nécessaires : humaines, consultants logistiques …" Indemnités non ) payées ou retard dans les paiements Travaux Détent Type de Méthodes d’atténuation du Risques eur du marchés risque risque - Bâtiments - Un seul attributaire pour tous les grands - Critères d’attribution prenant en UGP – - Travaux travaux compte la capacité des AR Routiers - Disponibilité des ressources nécessaires entreprises, leurs plans de Maître principalement les équipements et charge, la disponibilité des d'œuvre matériels présentés dans les offres matériels … – - Retard d’exécution, non-respect du - Exiger la disponibilité d’une Entrepri planning grande partie ou la totalité des se - Plaintes : LR, clauses et articles des équipements et matériels à DAO, DC, attributions, pendant Madagascar exécution, résiliation … - Vérification de visu de l’existence des équipements et matériels - Suivi rigoureux, augmenter la fréquence des visites, des réunions, implication et responsabilisation du Consultant chargé du Contrôle et surveillance… - Prévoir la clause sur la possibilité d’augmenter les cautions - Implication de tous les acteurs durant l’élaboration des documents, identifier et pallier les lacunes - Contraintes imposées par l'existence de - Tenir compte des impacts du UGP – Covid 19. Réouverture encore Covid sur les critères : AR progressive de la frontière disponibilité des consultants à Maître - Augmentation des prix des matériaux de l'étranger d'œuvre construction sur le marché local - Anticipation objective – - Spécifications techniques incomplètes (estimation, plainte, révision, Entrepri ou mal élaborées réactualisation des prix ...) se Conflit durant l'attribution - Bonne communication / Modification de prix (révisions des prix) information sur le process de - Nouveaux éléments dus aux différents l'EAS/HS et les risques encourus aléas (climatiques ou autres) par les Entreprises* - Non-paiement des indemnités par l'Etat - Mise en place de suivi rigoureux (expropriation) : nomination d'un point focal, - Risque environnemental lié implication de tous les acteurs, particulièrement aux carrières / mise en place d'un système de matériaux suivi efficace - Non-respect de planning d'exécution - Capitalisation des acquis des - Difficultés liées aux exigences relatives travaux routiers de mêmes au covid-19, particulièrement pour les envergures ou exécutés dans employés étrangers des conditions semblables - Risques liés aux EAS / HS : - Capitalisation des acquis sur les disqualification des Entreprises / sous- précédentes mises en place des traitant / personnel qualifié (Dispositions stations de pesage (exemple : relatives aux EAS / HS mal appliquées) Projet PUPIRV) - Plaintes à l’attribution - Capitaliser l'expérience acquise - Qualité des mises en œuvre sur les AO précédents : Bien insatisfaisante organiser l'acheminement des matériaux et matériels vers les 19 | P a g e Détent Type de Méthodes d’atténuation du Risques eur du marchés risque risque - Plan de charge des entreprises locales sites, tenir compte du facteur qualifiées climatique (saison des pluies) - Mauvaise organisation sur - Identification des tous les l'acheminement des matériels vers les facteurs de bocage et insertion chantiers - Exécution travaux pendant la d’articles, clauses et mesures période des pluies de mitigations dans le DAO - Modification de prix (révisions des prix) - Non-paiement des indemnités par l'Etat (expropriation) - Non maîtrise des techniques HIMO - Exiger la certification HIMO AR - Non maîtrise du concept MROR / MEROR - Capitalisation des acquis dans Maître - Spécifications techniques incomplètes les travaux MEROR / MROR avec d'œuvre ou mal élaborées l'Administration – - Formation en MEROR / MROR Entrepri se des acteurs principaux - Allotissement objectif des travaux 4. Analyse des risques liés à la passation de marchés Les marchés prévus sont au nombre de 46 et représente 95% du crédit alloué. La répartition est la suivante. CATEGORIE Montant (x1000USD) % Montant Nombre % Nombre Consultant 14 105 3,71% 33 71,74% Fournitures 350 0,09% 3 6,52% Travaux 365 694 96,18% 9 19,57% Services autres que services de Consultants 52 0,01% 1 2,17% Total général 380 201 100,00% 46 100,00% En considérant les diverses analyses effectuées auparavant, la liste des marchés par catégorisation est présentée dans les tableaux ci-après : STRATEGIQUE Coûts S/com Catégorie Réf Comp Libellé du Marché estimatifs p du Marché en $ x1000 1T 1 11 Travaux de bitumage de la RN10 Travaux 236 900,00 LEVIER Aucun marché dans cette catégorie. GOULOT D'ETRANGLEMENT Coûts S/com Catégorie Réf Comp Libellé du Marché estimatif p du Marché en $ x1000 2T 1 11 Travaux de bitumage de la RN31 Travaux 70 000,00 Travaux de réhabilitation de type HIMO 3T 1 12 Mécanisé des routes de dessertes reliées à Travaux 18 500,00 la RN10 Travaux de réhabilitation (MROR) basés sur 4T 2 22 Travaux 18 000,00 la performance en 3 lots pour la RN31 Mise en oeuvre du plan d'action de 7C 1 13 Consultant 3 301,00 reinstallation des travaux de bitumage de la 20 | P a g e Coûts S/com Catégorie Réf Comp Libellé du Marché estimatif p du Marché en $ x1000 RN10, RN31 et routes tertiaires - "Mission de maîtrise d'oeuvre sociale" Elaboration DAO, Contrôle et Surveillance 8C 1 11 des Travaux de réhabilitions de la RN10 et Consultant 1 500,00 station de pesage Mise en place de station de pesage sur la 9T 1 11 Travaux 1 447,00 RN10 Mise en place de station de pesage sur la 10T 1 11 Travaux 1 447,00 RN31 Travaux de construction de kiosques 11T 2 21 d'informations numériques le long des RN31 Travaux 1 400,00 et RN10 Sécurisation des emprises du projet des 12C 1 11 Consultant 1 122,16 travaux de la RN10 et station de pesage Etudes APS, APD, DAO, Contrôle et 14C 1 12 surveillance des entretiens routiers de type Consultant 900,00 HIMO Mécanisé sur la RN10 Elaboration DAO, Contrôle et Surveillance 15C 1 11 des Travaux de réhabilitions de la RN31 et Consultant 807,69 station de pesage Sécurisation des emprises du projet des 16C 3 32 Consultant 604,24 travaux de la RN31 et station de pesage EIES, y compris PGES et PAR des routes de dessertes reliées à la RN10 - Maîtrise 18C 1 12 Consultant 500,00 d'Œuvre Institutionnelle et Sociale (MOIS) de la RN10 Etudes, Contrôle et surveillanceTravaux d'amélioration d'environ 250 km de routes 20C 2 21 Consultant 400,00 provinciales, communales et non classées dans la région de la RN31 Etudes, Contrôle et surveillanceTravaux d'amélioration d'environ 250 km de routes 21C 2 21 Consultant 400,00 provinciales, communales et non classées dans la région de la RN10 Etudes et évaluation des besoins de base 22C 2 23 pour l'amélioration des infrastructures Consultant 300,00 rurales dans les zones du Projet Etudes, identification et analyse des 23C 2 23 obstacles à la participation des femmes aux Consultant 300,00 travaux routiers dans les zones du Projet Etudes d'identification des travaux, 24C 2 23 équipements et mise en place de kiosques Consultant 300,00 d'information dans les zones du Projet EIES, y compris PGES et PAR des routes de dessertes reliées à la RN31 27C 1 11 Maîtrise d'Œuvre Institutionnelle et Sociale Consultant 180,77 (MOIS) des routes de dessertes reliées à la RN31 EIES, y compris PGES et PAR des travaux (piste) d'amélioration d'environ 250 km de 28C 2 21 Consultant 150,00 routes provinciales, communales et non classées dans les régions de la RN12A EIES, y compris PGES et PAR des travaux d'amélioration d'environ 250 km de routes 29C 2 21 Consultant 150,00 provinciales, communales et non classées dans la région de la RN44 Etudes, Contrôle et surveillance des travaux 30C 2 21 de construction de Kiosques d'informations Consultant 150,00 numériques le long des RN10 et RN31 21 | P a g e Coûts S/com Catégorie Réf Comp Libellé du Marché estimatif p du Marché en $ x1000 Services Recrutement des Agences d'Exécution PAR autres que 39S 1 12 52,00 chargés des paiements des indemnités services de Consultants 22 | P a g e NON CRITIQUE Coûts S/com Catégorie Réf Comp Libellé du Marché estimatifs p du Marché en $ x1000 Travaux d'amélioration d'environ 250 km de 5T 2 21 routes provinciales, communales et non Travaux 9 000,00 classées dans les régions de la RN10 Travaux d'amélioration d'environ 250 km de 6T 2 21 routes provinciales, communales et non Travaux 9 000,00 classées dans la région de la RN31 Contrôle et supervision mécanisée de l'état 13C 1 11 Consultant 1 000,00 et la performance de la route Elaboration DAO, Contrôle et Surveillance pour superviser et mesurer l'état et la 17C 2 22 Consultant 600,00 performance (MROR) sur route non-revêtue pour la RN31 19C 2 22 Formation du personnel du MTP et AR Consultant 400,00 25F 3 33 Matériels de transport Fournitures 200,00 Renforcement des capacités institutionnelles, réglementaires et de 26C 3 31 Consultant 200,00 planification du MTP et de la MTTM et l’AR et le FR 31C 1 11 Analyse et audit de la sécurité routière RN10 Consultant 120,00 Missions de suivi environnemental, social et 32C 3 32 Consultant 120,00 VBG Etudes et analyse spatiale (mapping) dans 33C 2 21 Consultant 100,00 les zones du projet 34F 3 33 Matériels informatiques et bureautiques Fournitures 100,00 35C 3 33 Audit du Projet Consultant 100,00 Assistance technique sous forme de conseil 36C 3 33 en gestion de projet - Renforcement de Consultant 100,00 capacité de l'UCP Renforcement des capacités pour tester et adopter de nouveaux régimes d'entretien (micro-entreprises, contrats basés sur la 37C 3 31 Consultant 65,00 performance) pour une meilleure planification et gestion des infrastructures routières 38C 1 11 Analyse et Audit de la sécurité routière RN31 Consultant 64,62 Recrutement du Comité de prévention et de 40C 3 32 règlement des différents pour les travaux du Consultant 50,00 Projet (CPRD) 41F 3 33 Mobiliers de bureau Fournitures 50,00 Achat et mise à jour du logiciel de gestion 42C 3 33 Consultant 50,00 financière : Tom2Pro Elaboration/mise à jour Manuel Opérationnel 43C 3 33 Consultant 30,00 du Projet 44C 3 31 Amélioration de la sécurité routière Consultant 25,00 Assistance informatique : configuration des 45C 3 33 matériels informatiques de l'UCP, assistance Consultant 10,00 en cas de pannes, entretiens Appui à la mise à jour du PPSD du Projet 46C 3 33 Consultant 5,00 MPA 23 | P a g e Conclusion clé En termes de classement PARETO : • Un (01) marché de travaux sur la RN10 représente 62% du montant total estimatif des contrats à engager (Classe A). Son réalisation pourrait entrainer des impacts sur le rythme de décaissement et sur l’atteinte de l’objectif du projet, de ce fait, les processus nécessitent une vigilance particulière. Un retard au pendant la phase études pourrait avoir des répercussions énormes durant la phase d’exécution des travaux (le Projet est appelé à suivre de près le délai critique) • Les 45 marchés restants, soit environ 98% en termes de nombre de marchés, constituent les 38% du montant total estimatif des contrats à engager (Classe B et C). • Notons toutefois que le marché des travaux sur la RN31 qui représente 18,41% en termes de montant (classe B) nécessite un traitement particulier au même titre que les travaux sur la RN10 eu égard du montant assez élevé. Classe Nombre % Nombre Montant $ x1000 % Montant A 1 2,17% 236 900,00 62,31% B 2 4,35% 88 500,00 23,28% C 43 93,48% 54 801,47 14,41% Total général 46 100,00% 380 201,47 100,00% En termes de risque : • 35% des marchés présentent des risques minimes, ils représentent 5% du montant à engager (probabilité des risques 1 à 2) ; • 65% des marchés présentent des risques modérés, ils représentent plus de 95% du montant à engager (probabilité des risques 3) ; Aucun risque élevé n’a été noté, ceci est dû aux effets d’expérience de l’équipe du Projet avec l’appui du MTP dans les mises en œuvre des marchés antérieurs. Les risques même avec des probabilités minimes ou modérés doivent être atténués par des mesures appropriés durant leurs mises en œuvre respectives. Probabilité des risques (1 à Nombre % Nombre Montant $ x1000 % Montant 5) 1 9 19,57% 1 135,00 0,30% 2 7 15,22% 18 380,00 4,83% 3 30 65,22% 360 686,47 94,87% Total général 46 100,00% 380 201,47 100,00% 1 à 2 : risque minime – 3 à 4 : risque modéré – 5 risque élevé En termes d’impact sur la réalisation : • La réalisation des 10 marchés entrainera un impact considérable sur l’atteinte des objectifs du projet. Ils constituent 22% des marchés à engager en termes de nombre, soit environ 91% en termes de montant (impact 5) ; Impact des risques sur la % Montant $ % Nombre réalisation (1 à 5) Nombre x1000 Montant 2 1 2,17% 50,00 0,01% 3 10 21,74% 2 109,62 0,55% 4 25 54,35% 32 513,46 8,55% 5 10 21,74% 345 528,40 90,88% Total général 46 100,00% 380 201,47 100,00% 1 à 2 : impact minime – 3 à 4 : impact moyen – 5 impact élevé 24 | P a g e Classement KRALJIC L’importance du montant de chaque marché et de leur criticité ont aboutissent à la classification KRALJIC suivante : Coût estimatif % Coûts Nombr % Classement KRALJIC Catégorie du Marché en $x1000 estimatif e Nombre GOULOT Consultant 11 065,86 2,91% 16 34,78% D'ETRANGLEMENT Travaux 110 794,00 29,14% 6 13,04% Services autres que 52,00 0,01% 1 2,17% services de Consultants NON CRITIQUE Consultant 3 039,62 0,80% 17 36,96% Fournitures 350,00 0,09% 3 6,52% Travaux 18 000,00 4,73% 2 4,35% STRATEGIQUE Travaux 236 900,00 62,31% 1 2,17% Total général 380 201,47 100,00% 46 100,00% • Les marchés « stratégiques » : – sont à caractère prioritaire pour l’unité d’exécution ; et – nécessitent l’implication effective de tous les acteurs. • Les marchés « goulot d’étranglement » : – nécessitent une stratégie d'achats bien étudiée pour ne pas affecter le bon déroulement de l’unité d’exécution ; – constituent une étape obligatoire pour réaliser certaines activités. • Les marchés « levier » : – sont des activités importantes à coûts élevés, mais avec une criticité de risque modérée (aucun dans le cadre de la présente étude). • Les marchés « non-critiques » : – doivent pouvoir être traités simplement et efficacement en mobilisant un minimum de temps et de ressources au niveau de l'équipe de l’unité d’exécution. La priorité est donc ciblée sur les marchés classés stratégiques. Ils présentent les niveaux de criticité les plus élevés associés aux montants engagés. Les marchés classés goulot d’étranglement nécessitent aussi une attention particulière et une stratégie spécifique pour ne pas affecter le bon déroulement du projet. Dans le cas présent, il s’agit de la réalisation des travaux sur la RN10 qui est classé stratégique représentent environ 62% en termes de montant. Bien que classé dans la catégorie goulot d’étranglement selon la méthodologie d’élaboration du PPSD, les travaux sur la RN31 nécessitent également une attention particulière étant donné que l’activité représente 18% du montant total des marchés. Il devrait être traité au même titre que les travaux sur la RN10. 25 | P a g e 26 | P a g e 5. OBJECTIFS PRIORITAIRES DE PASSATION DE MARCHES • Réaliser des Appels d’Offres en visant le meilleur rapport qualité-prix possible ; • Minimiser les perturbations et maximiser le bénéfice économique local des travaux ; • Garantir le respect des spécifications techniques et fonctionnelles et des performances attendues ; • Allouer les risques à la partie la mieux placée pour les gérer ; • Minimiser le risque de défaillance et/ ou d’incompétence des firmes ; • Respect des délais contractuels ; • Garantir l’intégrité, la transparence et l’équité. Pour ce faire : - Les dossiers d'appels d'offres et leurs conditions doivent être robustes, transparents et clairs, - Au-delà des exigences techniques et fonctionnelles, les autres facteurs locaux pouvant affecter de manière significative les coûts du projet, doivent être identifiés et intégrés dans les DAO, - Les spécifications techniques et fonctionnelles, les critères de performance et les paramètres d’appel d’offres doivent être suffisamment clairs et appropriés pour éliminer toute ambiguïté et inviter un grand nombre de soumissionnaires à participer, en augmentant ainsi la concurrence, - Le contrat doit être accordé à un Soumissionnaire qualifié et expérimenté sans prolonger la période de validité des offres pour obtenir le résultat souhaité du contrat. Conclusion clé Le projet veillera à ce que les fournisseurs, les entreprises et les consultants qui seront recrutés disposent les qualifications nécessaires pour l’exécution des prestations. L’élaboration des termes de références et des spécifications techniques devrait être établie d’une façon minutieuse et répondent aux besoins de l’organisation de manière à optimiser les ressources. 16. Types de stratégies achats recommandés STRATEGIE PREFERENTIELL JUSTIFICATIONS TYPE DE MARCHE E PRECONISEE - Nécessite une concurrence ouverte - Travaux routiers : bitumage, - Existence des Entreprises qualifiées réhabilitation, amélioration de AO Ouverte - Entreprises internationales intéressées : routes de dessertes Internationale montant élevé ou attractif - Risque de tomber sur des produits de mauvaises qualités sur le marché local - Maîtrise de délai obligatoire (chemin critique) - Bâtiments : station de pesage, - Existences d'entreprises locales qualifiées kiosques - Montant non attractif pour les entreprises à l'étranger (montant moyen) AO Ouverte - Expériences et bonnes pratiques déjà nationale acquises lors des précédentes Appel d'Offres Ouverts au niveau national - Montant moins de 200,000 USD mais Concurrence ouverte nécessaire - Facilité de constitution de registres, existence - Equipements mobiliers : DC restreinte de registres au niveau d’autres Projets matériels informatiques, nationale (exemple PACT) mobiliers de bureau - Concurrence ouverte non nécessaire 27 | P a g e STRATEGIE PREFERENTIELL JUSTIFICATIONS TYPE DE MARCHE E PRECONISEE - Existences d'entreprises locales qualifiées - Montant non attractif pour les entreprises à l'étranger - Expériences et bonnes pratiques déjà acquises - Fournitures classiques - Faible montant - Exigence en termes de qualité des produits (facilité de contrôle, vérification, réception) et éviter les produits de contrefaçon ou mauvaises qualité - Consultant identifié - Assistance technique en appui Individuel à la mise en œuvre du Projet : Directe : national mapping, sécurité routières, ou international manuel, PPSD, - Assistance informatique Individuel - Consultant permanent travaillant au sein du - Assistance technique en appui Ouverte nationale Projet (Personnel de l'UGP) à la mise en œuvre du Projet Individuel - Existence de base de données - Assistance technique en appui restreinte Ne nécessite pas de travail d'équipe à la mise en œuvre du Projet internationale - Existence de Consultants qualifiés et base de - Assistance technique en appui données à la mise en œuvre du Projet Individuel - Montant faible - Assistance informatique restreinte - Prestations classiques - Formation et renforcement de nationale - Prestations assez pointues capacité - Ne nécessite pas de travail d'équipe - Montant faible - Risque moindre voire quasi inexistant - Equipements mobiliers NU (véhicules) - Centre de Formation en Infrastructures - Formation et renforcement de routières identifié : ININFRA - Institut National capacité de l'Infrastructure - Représentant unique du logiciel à - Assistance technique en appui SD Madagascar à la mise en œuvre du Projet nationale/Internat - Expériences passées avec les intitutions de - Appui aux maîtrises d'œuvre ionale microfinance avec des projets similaires institutionnelle et Sociale (exemmple : PACT) - Eviter les microfinances de mauvaise réputation (garantir la sécurité des fonds d’indemnisation) - Nécessite une concurrence ouverte à - Contrôle et supervision des l’internationale travaux routiers - Existence de Consultants qualifiés dans des - Assistance technique en appui domaines de natures similaires à la mise en œuvre du Projet SFQC Ouverte - Marché attractif pour les Consultants à - Etudes, Contrôle et Internationale l'étranger surveillance des Travaux BTP - Existence ou plusieurs Consultants qualifiés - Etudes d'impact - Montant attractif pour les Consultants à environnemental et social / l'étranger M.O.I.S. / Communication / Audit / Mise en œuvre VBG - Plusieurs firmes qualifiées au niveau national - Etudes d'impact - Prestations assez spécifiques environnemental et social / SFQC Ouverte - Nécessite une concurrence ouverte au niveau M.O.I.S. / Communication / nationale national Audit / Mise en œuvre VBG - Montant pouvant ne pas être attractif pour les firmes à l'international SMC restreinte - Cabinets identifiés et présélectionnés - Audit externes nationale - Montant faible - Etudes, Contrôle et - Prestations classiques surveillance des Travaux BTP SQC ouverte - Nécessite une concurrence ouverte - Etudes d'impact nationale - Plusieurs firmes qualifiées environnemental et social / - Prestations assez spécifiques M.O.I.S. / Communication / Audit / Mise en œuvre VBG 28 | P a g e STRATEGIE PREFERENTIELL JUSTIFICATIONS TYPE DE MARCHE E PRECONISEE - Peut également être confié à des Cabinets en - Assistance technique en appui gestion, Universités ou Instituts spécialisés à la mise en œuvre du Projet pour certains types de prestation - Nécessite une concurrence ouverte à - Etudes d'impact l’international environnemental et social / CI Ouverte / - Nombre de Consultants nationaux insuffisant M.O.I.S. / Communication / restreinte - Ne nécessite pas de travail d'équipe Audit / Mise en œuvre VBG internationale - Montant attractif pour les Consultants - Assistance technique en appui individuels à l'international à la mise en œuvre du Projet 29 | P a g e 1. Plan de passation de marchés simplifié Consultants Revue à Montant Prép & Sous- priori ou Code Méthode de estimatif Soumissio Signature EAS / HS Composa Description à marché sélection en USD n TDR / Contrat (*) nte posterior '000 Spéc Tec i Mise en oeuvre du plan d'action de reinstallation des travaux de 7C 12 bitumage de la RN10, RN31 et routes tertiaires - "Mission de SFQC 3 301,0 a priori 1-juin-22 22-nov.-22 maîtrise d'oeuvre sociale" Elaboration DAO, Contrôle et Surveillance des Travaux de 8C 11 SFQC 1 500,0 a priori 1-juin-22 22-nov.-22 réhabilitions de la RN10 et station de pesage Sécurisation des emprises du projet des travaux de la RN10 et 12C 11 SFQC 1 122,2 a priori 1-mai-22 22-oct.-22 station de pesage Contrôle et supervision mécanisée de l'état et la performance de la 13C 11 SFQC 1 000,0 a priori 1-juil.-22 22-déc.-22 route Elaboration DAO, Contrôle et Surveillance des Travaux de 15C 11 SFQC 807,7 a priori 1-juin-22 22-nov.-22 réhabilitions de la RN31 et station de pesage Sécurisation des emprises du projet des travaux de la RN31 et 16C 11 SFQC 604,2 a priori 1-mai-22 22-oct.-22 station de pesage EIES, y compris PGES et PAR des routes de dessertes reliées à la a 18C 11 RN10 - Maîtrise d'Œuvre Institutionnelle et Sociale (MOIS) de la SFQC 500,0 1-avr.-22 21-août-22 posteriori RN10 EIES, y compris PGES et PAR des routes de dessertes reliées à la a 27C 11 RN31, Maîtrise d'Œuvre Institutionnelle et Sociale (MOIS) des routes SFQC 180,8 1-mai-22 23-sept.-22 posteriori de dessertes reliées à la RN31 a 31C 11 Analyse et audit de la sécurité routière RN10 CI 120,0 1-avr.-22 18-mai-22 posteriori a 38C 11 Analyse et Audit de la sécurité routière RN31 CI 64,6 1-mai-22 17-juin-22 posteriori Etudes APS, APD, DAO, Contrôle et surveillance des entretiens 14C 22 SFQC 900,0 a priori 1-juin-22 22-nov.-22 routiers de type HIMO Mécanisé sur la RN10 Elaboration DAO, Contrôle et Surveillance pour superviser et a 17C 22 mesurer l'état et la performance (MEROR) sur route non-revêtue SFQC 600,0 1-juin-22 24-oct.-22 posteriori pour la RN31 a 19C 22 Formation du personnel du MTP et AR SD 400,0 15-janv.-23 17-mars-23 posteriori Etudes, Contrôle et surveillanceTravaux d'amélioration d'environ a 20C 21 250 km de routes provinciales, communales et non classées dans la SFQC 400,0 15-mai-23 7-oct.-23 posteriori région de la RN31 Etudes, Contrôle et surveillanceTravaux d'amélioration d'environ a 21C 21 250 km de routes provinciales, communales et non classées dans la SFQC 400,0 15-mai-23 7-oct.-23 posteriori région de la RN10 Etudes et évaluation des besoins de base pour l'amélioration des a 22C 23 SQC 300,0 1-juin-23 16-oct.-23 infrastructures rurales dans les zones du Projet posteriori 30 | P a g e Revue à Montant Prép & Sous- priori ou Code Méthode de estimatif Soumissio Signature EAS / HS Composa Description à marché sélection en USD n TDR / Contrat (*) nte posterior '000 Spéc Tec i Etudes, identification et analyse des obstacles à la participation des a 23C 23 SQC 300,0 1-juin-23 16-oct.-23 femmes aux travaux routiers dans les zones du Projet posteriori Etudes d'identification des travaux, équipements et mise en place a 24C 23 SQC 300,0 1-juin-23 16-oct.-23 de kiosques d'information dans les zones du Projet posteriori EIES, y compris PGES et PAR des travaux (piste) d'amélioration a 28C 21 d'environ 250 km de routes provinciales, communales et non SQC 150,0 6-nov.-23 22-mars-24 posteriori classées dans les régions de la RN12A EIES, y compris PGES et PAR des travaux d'amélioration d'environ a 29C 21 250 km de routes provinciales, communales et non classées dans la SQC 150,0 6-nov.-23 22-mars-24 posteriori région de la RN44 Etudes, Contrôle et surveillance des travaux de construction de a 30C 21 SQC 150,0 15-mai-23 29-sept.-23 Kiosques d'informations numériques le long des RN10 et RN31 posteriori a 33C 21 Etudes et analyse spatiale (mapping) dans les zones du projet CI 100,0 15-mars-22 1-mai-22 posteriori a 14C 0 Formation du personnel du MTP et AR CI 400,0 1-avr.-22 18-mai-22 posteriori Renforcement des capacités institutionnelles, réglementaires et de a 20C 32 CI 200,0 1-juin-22 18-juil.-22 planification du MTP et de la MTTM et l’AR et le FR posteriori a 22C 33 Missions de suivi environnemental, social et VBG SQC 120,0 1-mai-22 15-sept.-22 posteriori a 23C 33 Audit du Projet SMC 100,0 1-oct.-22 31-janv.-23 posteriori Assistance technique sous forme de conseil en gestion de projet - a 24C 32 SQC 100,0 1-juin-22 16-oct.-22 Renforcement de capacité de l'UCP posteriori Renforcement des capacités pour tester et adopter de nouveaux régimes d'entretien (micro-entreprises, contrats basés sur la a 25C 11 SD 65,0 1-oct.-22 1-déc.-22 performance) pour une meilleure planification et gestion des posteriori infrastructures routières Recrutement du Comité de prévention et de règlement des a 26C 32 CI 50,0 1-juin-23 18-juil.-23 différents pour les travaux du Projet (CPRD) posteriori a 28C 33 Achat et mise à jour du logiciel de gestion financière : Tom2Pro SD 50,0 1-août-22 26-sept.-22 posteriori a 29C 33 Elaboration/mise à jour Manuel Opérationnel du Projet CI 30,0 1-juil.-22 17-août-22 posteriori a 30C 31 Amélioration de la sécurité routière CI 25,0 1-juil.-22 17-août-22 posteriori Assistance informatique : configuration des matériels informatiques a 31C 33 CI 10,0 1-avr.-22 18-mai-22 de l'UCP, assistance en cas de pannes, entretiens posteriori a 32C 33 Appui à la mise à jour du PPSD du Projet MPA CI 5,0 1-juil.-22 17-août-22 posteriori 31 | P a g e Fournitures Prép & Sous- Montant Revue à Code Méthode de Soumissio Signature Composan Description estimatif en priori ou à EAS / HS (*) marché sélection n TDR / Contrat te USD '000 posteriori Spéc Tec 25F 33 Matériels de transport NU 200,0 a posteriori 15-avr.-22 15-mai-22 34F 33 Matériels informatiques et bureautiques DC 100,0 a posteriori 15-avr.-22 4-juil.-22 41F 33 Mobiliers de bureau DC 50,0 a posteriori 15-avr.-22 4-juil.-22 Services autres que services de consultants Prép & Sous- Montant Revue à Code Méthode de Soumissio Signature Composan Description estimatif en priori ou à EAS / HS (*) marché sélection n TDR / Contrat te USD '000 posteriori Spéc Tec Recrutement des Agences d'Exécution PAR chargés des 39S 13 SD 52,0 a posteriori 3-nov.-22 13-nov.-22 paiements des indemnités 32 | P a g e Travaux Revue à Prép & Code Méthode Montant Sous- priori ou Soumission Signature EAS / HS march Description de estimatif en Composante à TDR / Spéc Contrat (*) é sélection USD '000 posteriori Tec 1T 11 Travaux de bitumage de la RN10 AOI 246 024,6 à priori 22-déc.-22 8-avr.-23 2T 11 Travaux de bitumage de la RN31 AOI 86 152,4 à priori 22-déc.-22 8-avr.-23 Travaux de réhabilitation de type HIMO Mécanisé des routes de 3T 12 AOI 18 500,0 à priori 30-juin-23 15-oct.-23 dessertes reliées à la RN10 9T 11 Mise en place de station de pesage sur la RN10 AON 1 447,0 à posteriori 8-avr.-23 2-juil.-23 10T 11 Mise en place de station de pesage sur la RN31 AON 1 447,0 à posteriori 8-avr.-23 2-juil.-23 Travaux de réhabilitation (MEROR) basés sur la performance en 3 4T 22 AOI 18 000,0 à priori 10-janv.-00 26-avr.-00 lots pour la RN31 Travaux d'amélioration d'environ 250 km de routes provinciales, 5T 21 AOI 9 000,0 à posteriori 1-août-23 25-oct.-23 communales et non classées dans les régions de la RN10 Travaux d'amélioration d'environ 250 km de routes provinciales, 6T 21 AOI 9 000,0 à posteriori 1-août-23 25-oct.-23 communales et non classées dans la région de la RN31 Travaux de construction de kiosques d'informations numériques le 11T 21 AON 1 400,0 à posteriori 1-août-23 25-oct.-23 long des RN31 et RN10 (*) : le risque EAS / HS pour les travaux est défini par la Banque Mondiale. La revue pourrait changer en conséquence et passée "à priori". 33 | P a g e Seuil de revue à priori Méthode de Passation de Seuil de revue Commentaires marchés à priori Fournitures, Système d’information, et Services autres que les services de consultant 1. AOI >4.000.000$ M>500.000 2. AON Néant M<500.000 3. DC Néant M<100.000 4. UNOPS >4.000.000 Travaux 4. AOI >15,000,000 M>3,000,000 5. AON Néant M<3,000,000 6. DC Néant M<200,000 7. Entente directe Même que AOI Seuil de revue à Méthode de sélection Commentaires priori 1. Toute méthode confondue pour une firme >2.000,000 2. Entente directe pour une firme >2.000,000 3. Consultation individuelle >400,000 4. Entente directe pour un CI >400,000 AOI = Appel d'Offres International ; AON = Appel d'Offres National Ouvert ; DC = Demande de Cotation ; SFQC = Sélection Fondée sur la Qualité et le Coût ; SFQ = Sélection Fondée sur la Qualité ; SQC = Sélection Fondée sur les Qualifications des Consultants ; SCBD = Sélection dans le Cadre d'un Budget Déterminé ; SMC = Sélection au Moindre Coût ; SED = Sélection par Entente Directe ; CI = Consultants Individuels 34 | P a g e PROCUREMENT Madagascar : Connecting Madagascar for Inclusive Growth PLAN General Information Country: Madagascar 2022-06-24 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173711 GPN Date: Project Name: Connecting Madagascar for Inclusive Growth Loan / Credit No: IDA / 70600 Road Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 22-PCMCI-TX - PISTE RN10 / Request for Bids - Improving the Accessibility a Travaux de réhabilitation de Open - Internationa Single Stage - One E Works French Civi 10,000,000.0 Pending Imp 2026-03-2 IDA / 70600 nd Socio-Economic benefits Prior Request for Bids 0.00 2024-06-01 2024-06-06 2024-07-23 2024-08-22 2024-09-28 routes de desserte prioritaire l nvelope l Law (French) SP 0 lementation 2 of Feeder Roads s reliées à la RN10 D 23-PCMCI-TX - PISTE RN31 / Request for Bids - Improving the Accessibility a Travaux de réhabilitation de Open - Internationa Single Stage - One E Works French Civi 10,000,000.0 Pending Imp 2026-03-2 IDA / 70600 nd Socio-Economic benefits Prior Request for Bids 0.00 2024-06-01 2024-06-06 2024-07-24 2024-08-23 2024-09-27 routes de desserte prioritaire l nvelope l Law (French) SP 0 lementation 1 of Feeder Roads s reliées à la RN31 D Request for Bids - 16-PCMCI-TX-RN31 / Travau Improving Condition and Res Open - Internationa Single Stage - One E Works French Civi 69,900,000.0 Under Imple 2026-05-0 x de bitumage de la RNT31 - IDA / 70600 Prior Request for Bids 0.00 2023-01-10 2023-01-15 2023-03-01 2023-03-31 2023-05-05 ilience of Primary Roads l nvelope l Law (French) SP 0 mentation 5 section 1 répartis en 2 lots D Request for Bids - 15-PCMCI-TX-RN10 / Travau Improving Condition and Res Open - Internationa Single Stage - One E Works French Civi 234,500,000. Pending Imp 2026-08-0 x de bitumage de la RNS10 , IDA / 70600 Prior Request for Bids 0.00 2023-04-01 2023-04-11 2023-05-31 2023-06-30 2023-08-04 ilience of Primary Roads l nvelope l Law (French) SP 00 lementation 4 répartis en 5 lots D Request for Bids - 29-PCMCI-ENTRETIEN-REPAR Technical Assistance and Su Single Stage - One E Works French Civi Pending Imp 2023-10-1 ATION / Entretien et réparati IDA / 70600 pport to Transport Sector Re Post Request for Bids Open - National 100,000.00 0.00 2023-03-01 2023-03-06 2023-04-17 2023-05-17 2023-06-21 nvelope l Law (French) SP lementation 9 on du bâtiment de l'UGP forms D GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 21-PCMCI-MATERIELS-INFOR Technical Assistance and Su Request for Quota Single Stage - One E Pending Impl MATIQUES / Matériels inform IDA / 70600 pport to Transport Sector Re Post Open - National 100,000.00 0.00 2023-07-01 2023-08-26 2023-10-25 tions nvelope ementation atiques et bureautiques forms 25-PCMCI-MOBILIERS-BUREA Technical Assistance and Su Request for Quota Single Stage - One E Pending Impl IDA / 70600 Post Open - National 50,000.00 0.00 2023-06-20 2023-08-15 2023-10-14 U / Mobiliers de bureau pport to Transport Sector Re tions nvelope ementation forms NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 20-PCMCI-AGENCE-PAIEMEN Technical Assistance and Su Request for Quota Single Stage - One E Pending Impl T / Prestation de l'Agence de IDA / 70600 pport to Transport Sector Re Post Limited 52,000.00 0.00 2023-04-03 2023-05-29 2024-05-23 tions nvelope ementation paiement des indemnités forms CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 01-PCMCI-MOIS-RN10 / EIES, y compris PGES et PAR des r Improving Condition and Res Quality And Cost- Under Implement outes de dessertes reliées à l IDA / 70600 Post Open - National 500,000.00 0.00 2022-07-15 2022-06-27 2022-08-05 2022-09-18 2022-08-16 2022-10-16 2022-11-15 2022-12-20 2023-01-24 2024-01-24 ilience of Primary Roads Based Selection ation a RN10 - Maîtrise d'Œuvre In stitutionnelle et Sociale (MOI S) de la RN10 02-PCMCI-MOIS-RN 31 / EIES , y compris PGES et PAR des routes de dessertes reliées à Improving Condition and Res Quality And Cost- Under Implement IDA / 70600 Post Open - National 180,800.00 0.00 2022-07-15 2022-06-29 2022-08-05 2022-09-18 2022-10-24 2022-10-16 2022-12-08 2022-11-15 2023-02-06 2022-12-20 2023-02-23 2023-01-24 2024-01-24 la RN31, Maîtrise d'Œuvre Ins ilience of Primary Roads Based Selection ation titutionnelle et Sociale (MOIS ) des routes de dessertes rel iées à la RN31 03-PCMCI-RECRUTEMENT VB Improving Condition and Res Quality And Cost- Under Implement G-RN10 / Recrutement VBG IDA / 70600 Post Open - National 120,000.00 0.00 2022-07-15 2022-08-26 2022-08-05 2022-12-05 2022-09-18 2023-03-09 2022-10-16 2023-04-25 2022-11-15 2022-12-20 2023-01-24 2024-01-24 ilience of Primary Roads Based Selection ation PCMCI -RN 10 pour 05 ans 04-PCMCI-RECRUTEMENT VB Improving Condition and Res Quality And Cost- Under Implement G-RN31 / RECRUTEMENT VBG IDA / 70600 Post Open - National 120,000.00 0.00 2022-07-15 2022-08-26 2022-08-05 2022-12-05 2022-09-18 2023-03-10 2022-10-16 2023-04-26 2022-11-15 2022-12-20 2023-01-24 2024-01-24 ilience of Primary Roads Based Selection ation PCMCI-RN31 pour 05 ans 08-PCMCI-VERIF INDEMNISA TION -RN10-RN31 / Recrutem Improving Condition and Res Quality Based Sel Under Implement ent d'un cabinet pour vérifica IDA / 70600 Post Open - National 60,000.00 0.00 2022-07-29 2022-06-30 2022-08-19 2022-08-12 2022-10-02 2022-10-30 2022-11-29 2022-12-29 2023-02-02 2024-02-02 ilience of Primary Roads ection ation tion indépendante des indem nisations - RN10 et RN31 10-PCMCI-GCSAR-RN10-LOT 1-200KM / Gestion, contrôle et surveillance des travaux d e réhabilitation de la Route N Improving Condition and Res Quality And Cost- Open - Internationa Under Implement ationale Secondaire N°10 (R IDA / 70600 Prior 1,200,000.00 0.00 2022-06-30 2022-07-14 2022-07-21 2022-09-03 2022-09-14 2022-10-01 2022-11-18 2022-10-31 2022-12-05 2023-01-09 2024-01-09 ilience of Primary Roads Based Selection l ation NS 10) reliant Ambovombe e t la RNP7 et des travaux de c onstruction des stations de p esage sur cet axe (200km) L ot 1 PK 0+000 au PK 200+00 0 Page 1 11-PCMI-GCSAR-RN10-LOT2- 200KM / Gestion, contrôle et surveillance des travaux de r éhabilitation de la Route Nati Improving Condition and Res Quality And Cost- Open - Internationa Under Implement onale Secondaire N°10 (RNS IDA / 70600 Prior 1,200,000.00 0.00 2022-06-30 2022-07-14 2022-07-21 2022-09-03 2022-09-14 2022-10-01 2022-11-18 2022-10-31 2022-12-05 2023-01-09 2024-01-09 ilience of Primary Roads Based Selection l ation 10) reliant Ambovombe et la RNP7 et des travaux de const ruction des stations de pesag e sur cet axe Lot 2: PK 200+000 au PK 434 +000 12-PCMCI- EGCS PISTE - RN1 0 / Etudes de faisabilité écon Improving the Accessibility a omiques et techniques détaill Quality And Cost- Open - Internationa Under Implement IDA / 70600 nd Socio-Economic benefits Prior 1,000,000.00 0.00 2022-10-03 2022-12-08 2022-10-24 2023-01-28 2022-12-07 2023-01-04 2023-02-03 2023-03-10 2023-04-14 2025-04-14 ées, gestion, contrôle et surv Based Selection l ation of Feeder Roads eillance de travaux de réhabi litation des pistes connexes r eliées à la RNS10 13-PCMCI-EGCS PISTE - RN3 1 / Etudes de faisabilité écon Improving the Accessibility a omiques et techniques détaill Quality And Cost- Open - Internationa Under Implement IDA / 70600 nd Socio-Economic benefits Prior 1,000,000.00 0.00 2022-10-03 2022-12-08 2022-10-24 2023-01-28 2022-12-07 2023-01-04 2023-02-03 2023-03-10 2023-04-14 2025-04-14 ées, gestion, contrôle et surv Based Selection l ation of Feeder Roads eillance de travaux de réhabi litation des pistes connexes r eliées à la RNS31 24-PCMCI -COMM / Mise en o Technical Assistance and Su Quality And Cost- Pending Impleme euvre de la stratégie de com IDA / 70600 pport to Transport Sector Re Post Open - National 500,000.00 0.00 2023-01-20 2023-02-10 2023-03-26 2023-04-26 2023-05-26 2023-06-30 2023-08-04 2025-12-30 Based Selection ntation munication du projet PCMCI ( forms 2023-2025) 14-PCMCI-AUDIT EXTERNE / Technical Assistance and Su Least Cost Selecti Under Implement Audit externe des comptes d IDA / 70600 pport to Transport Sector Re Post Open - National 50,000.00 0.00 2022-12-16 2022-11-28 2023-01-06 2023-02-19 2022-11-28 2023-03-19 2023-01-26 2023-04-18 2023-05-19 2023-05-23 2023-06-27 2025-03-30 on ation es exercices 2023 et 2024 du forms projet PCMCI 17-PCMCI-IDENTIFICATION-I NVESTISSEMENTS / Etudes d' Improving the Accessibility a identification des investisse Consultant Qualifi Pending Impleme IDA / 70600 nd Socio-Economic benefits Post Open - National 200,000.00 0.00 2023-02-28 2023-03-21 2023-05-04 2023-06-03 2023-07-08 2024-01-04 ments communautaires spéci cation Selection ntation of Feeder Roads fiques (à vocation économiqu e et/ou sociale) dans les zone s du Projet 18-PCMCI-AUDIT-ORGANISAT Technical Assistance and Su Consultant Qualifi Pending Impleme IONNEL-AR / Audit Organisati IDA / 70600 pport to Transport Sector Re Post Open - National 50,000.00 0.00 2023-03-14 2023-04-04 2023-05-18 2023-06-17 2023-07-22 2024-01-18 cation Selection ntation onnel de l'Agence Routière forms 31-PCMCI-EAPM-RN6 / Etude s de faisabilité technique et é conomique, études techniqu es détaillées et assistance à l Improving Condition and Res Quality And Cost- Open - Internationa Under Implement IDA / 70600 Prior 3,000,000.00 0.00 2023-05-08 2023-05-25 2023-05-29 2023-07-12 2023-08-09 2023-09-08 2023-10-13 2023-11-17 2024-09-12 a passation de marché pour l ilience of Primary Roads Based Selection l ation es travaux de réhabilitation d e la route nationale primaire N°6 entre Ambondromamy (P K 0) et Ambanja ( PK 467) 32-PCMCI-AUDIT SECURITE R Improving Condition and Res Quality And Cost- Open - Internationa Pending Impleme OUTIER-RN6-RN13 / Analyse IDA / 70600 Post 500,000.00 0.00 2023-06-19 2023-07-10 2023-08-23 2023-09-20 2023-10-20 2023-11-24 2023-12-29 2024-12-28 ilience of Primary Roads Based Selection l ntation et audit de la sécurité routièr e RN6 et RN 13 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 05-PCMCI-AUDIT SECURITE R Improving Condition and Res Individual Consult Under Implement OUTIER-RN 10 / Analyse et a IDA / 70600 Post Open 120,000.00 0.00 2022-07-20 2022-08-16 2022-09-07 2022-10-27 2022-09-28 2022-11-09 2022-11-02 2023-05-01 ilience of Primary Roads ant Selection ation udit de la sécurité routière R N10 06-PCMCI-AUDIT SECURITE R Improving Condition and Res Individual Consult Under Implement OUTIERE-RN 31 / Analyse et IDA / 70600 Post Open 64,600.00 0.00 2022-07-20 2022-08-30 2022-09-07 2022-10-27 2022-09-28 2022-11-09 2022-11-02 2023-05-01 ilience of Primary Roads ant Selection ation Audit de la sécurité routière RN31 07-PCMCI-LISTE PISTES PCM Improving Condition and Res Individual Consult Under Implement CI / Identification de la listes IDA / 70600 Post Open 20,000.00 0.00 2022-07-29 2022-06-29 2022-09-16 2022-10-07 2022-11-11 2023-05-10 ilience of Primary Roads ant Selection ation des pistes PCMCI 09-PCMCI-CI-INGENIEUR RO UTIER PCMCI / Recrutement Improving Condition and Res Individual Consult Under Implement IDA / 70600 Post Open 90,000.00 0.00 2022-07-25 2022-08-11 2022-09-12 2023-01-06 2022-10-03 2023-01-06 2022-11-07 2023-05-06 d'un ingénieur routier senior ilience of Primary Roads ant Selection ation pour chaque projet PCMCI 28-PCMCI-PPSD / Appui à la Technical Assistance and Su Individual Consult Pending Impleme IDA / 70600 Post Open - National 5,000.00 0.00 2023-08-28 2023-10-16 2023-11-06 2023-12-11 2024-01-10 mise à jour du PPSD du Proje pport to Transport Sector Re ant Selection ntation t PCMCI forms 30-PCMCI-SIG / Consultant SI Technical Assistance and Su Individual Consult Under Implement IDA / 70600 Post Open - National 10,000.00 0.00 2023-02-07 2023-04-04 2023-03-28 2023-04-18 2023-05-23 2024-05-17 G pport to Transport Sector Re ant Selection ation forms 19-PCMCI-PREVENTION DIFF Technical Assistance and Su ERENDS / Assistance techniq Individual Consult Pending Impleme IDA / 70600 pport to Transport Sector Re Post Open - National 50,000.00 0.00 2023-05-02 2023-06-20 2023-07-11 2023-08-15 2025-08-14 ue pour la prévention et le rè ant Selection ntation forms glement des différends pour l es activités du Projet 27-PCMCI-ASSISTANCE-INFO Technical Assistance and Su Individual Consult Pending Impleme IDA / 70600 Post Open - National 10,000.00 0.00 2023-05-02 2023-06-20 2023-07-11 2023-08-15 2024-08-14 RMATIQUE / Assistance infor pport to Transport Sector Re ant Selection ntation matique forms 07-PCMCI-LISTE-PISTES-PCM Improving Condition and Res Individual Consult Pending Impleme CI / Identification de la liste d IDA / 70600 Post Open - National 100,000.00 0.00 2022-06-29 2023-01-25 2023-02-15 2023-03-22 2023-09-18 ilience of Primary Roads ant Selection ntation es pistes PCMCI Page 2 PROCUREMENT PLAN (Textual Part) Project information: EL Salvador Growing Up and Learning Together: Comprehensive Early Childhood Development P171316 Project Implementation agency: Ministerio de Educación, Ciencia y Tecnología Date of the Procurement Plan: December 6, 2021 Period covered by this Procurement Plan: December 6, 2021 – December 31, 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. PROCUREMENT El Salvador : Growing Up and Learning Together: Comprehensive Early Childhood Development in El Salvador PLAN General Information Country: El Salvador Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if 2023-05-22 none) Project ID: P171316 GPN Date: Project Name: Growing Up and Learning Together: Comprehensive Early Childhood Development in El Salvador Loan / Credit No: IBRD / 90670 Ministry of Public Works and Transport Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SDO 006/2023 / “REHABILIT Request for Bids - ACIÓN DE CENTROS EDUCATI Contingency Emergency Res Single Stage - One E Small Works SPD Pending Imp 2024-03-3 IBRD / 90670 Post Request for Bids Open - National 5,620,424.00 0.00 2023-06-12 2023-06-17 2023-07-29 2023-08-28 2023-10-02 VOS AFECTADOS POR LA TOR ponse nvelope (1 envelope proce lementation 0 MENTA TROPICAL JULIA EN L ss) A REGIÓN CENTRAL” SDO 007/2023 / “REHABILIT Request for Bids - ACIÓN DE CENTROS EDUCATI Contingency Emergency Res Single Stage - One E Small Works SPD Pending Imp 2024-03-3 VOS AFECTADOS POR LA TOR IBRD / 90670 Post Request for Bids Open - National 1,941,175.18 0.00 2023-06-12 2023-06-17 2023-07-29 2023-08-28 2023-10-02 ponse nvelope (1 envelope proce lementation 0 MENTA TROPICAL JULIA EN L ss) A REGIÓN OCCIDENTAL” SDO 008/2023 / “REHABILIT Request for Bids - ACIÓN DE CENTROS EDUCATI Contingency Emergency Res Single Stage - One E Small Works SPD Pending Imp 2024-03-3 IBRD / 90670 Post Request for Bids Open - National 7,929,632.81 0.00 2023-06-12 2023-06-17 2023-07-29 2023-08-28 2023-10-02 VOS AFECTADOS POR LA TOR ponse nvelope (1 envelope proce lementation 0 MENTA TROPICAL JULIA EN L ss) A REGIÓN ORIENTAL” GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SDP-SCC 009/2023 / SUPERV ISIÓN DE “REHABILITACIÓN D Contingency Emergency Res Consultant Qualifi Pending Impleme E CENTROS EDUCATIVOS AFE IBRD / 90670 Post Open - National 155,294.02 0.00 2023-06-02 2023-06-23 2023-08-06 2023-09-05 2023-10-10 2024-04-07 ponse cation Selection ntation CTADOS POR LA TORMENTA TROPICAL JULIA EN LA REGIÓ N OCCIDENTAL” SDP-SCC 008/2023 / SUPERV ISIÓN DE “REHABILITACIÓN D Contingency Emergency Res Consultant Qualifi Pending Impleme E CENTROS EDUCATIVOS AFE IBRD / 90670 Post Open - National 449,633.92 0.00 2023-06-05 2023-06-26 2023-08-09 2023-09-08 2023-10-13 2024-04-10 ponse cation Selection ntation CTADOS POR LA TORMENTA TROPICAL JULIA EN LA REGIÓ N CENTRAL”. SDP-SCC 010/2023 / SUPERV ISIÓN DE“REHABILITACIÓN D Contingency Emergency Res Consultant Qualifi Pending Impleme E CENTROS EDUCATIVOS AFE IBRD / 90670 Post Open - National 634,370.63 0.00 2023-06-05 2023-06-26 2023-08-09 2023-09-08 2023-10-13 2024-04-10 ponse cation Selection ntation CTADOS POR LA TORMENTA TROPICAL JULIA EN LA REGIÓ N ORIENTAL” INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PROCUREMENT PLAN (Textual Part) Project information: Emergency Agricultural Livelihoods and Climate Resilience Project (P166328) Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. PROCUREMENT Dominica : Emergency Agricultural Livelihoods and Climate Resilience Project PLAN General Information Country: Dominica 2018-07-27 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166328 GPN Date: Project Name: Emergency Agricultural Livelihoods and Climate Resilience Project Loan / Credit No: IDA / D3060, IDA / 62310, IDA / 67340 The Ministry of Agriculture Food and Fisheries. Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DM-MAF-101002-CW-DIR / Cl Restoration of the Productiv 2019-09-2 earance of the WNTrail - Seg IDA / D3060 e Base for the Recovery of A Post Direct Selection Direct 10,000.00 14,379.70 Completed 2019-02-18 2019-02-20 2019-02-23 2019-02-21 2019-03-30 2019-05-31 6 ments 5 and 6 gricultural Livelihoods DM-MAF-101005-CW-DIR / Cl Restoration of the Productiv 2019-09-2 earance of the WNT - works o IDA / D3060 e Base for the Recovery of A Post Direct Selection Direct 12,000.00 13,521.81 Signed 2019-02-18 2019-02-20 2019-02-23 2019-02-21 2019-03-30 2019-05-31 6 n segments 11 and 13 gricultural Livelihoods Restoration of the Productiv DM-MAF-101006-CW-DIR / Cl 2019-09-2 IDA / D3060 e Base for the Recovery of A Post Direct Selection Direct 44,000.00 41,145.04 Signed 2019-02-18 2019-02-20 2019-02-23 2019-02-21 2019-03-30 2019-05-31 earance of WNT - Segment 8 6 gricultural Livelihoods DM-MAF-133099-CW-RFQ / R Restoration of Key Productiv Request for Quota Single Stage - One E 2020-05-0 ehabilitation of Central Livest IDA / 62310 e Infrastructure and Instituti Post Limited 200,000.00 226,522.41 Signed 2019-09-15 2020-06-22 2019-11-10 2020-12-19 tions nvelope 8 ock Farm onal Strengthening DM-MAF-170057-CW-RFQ / R Contingency Emergency Res Request for Quota Single Stage - One E 2020-12-2 IDA / 62310 Post Limited 135,740.74 0.00 Canceled 2020-04-28 2020-06-23 etrofitting Buildings into COV ponse tions nvelope 0 ID Facilities DM-MAF-170098-CW-DIR / In stallation of Water and Sewer Contingency Emergency Res 2020-11-1 IDA / 62310 Post Direct Selection Direct 9,258.01 9,212.79 Completed 2020-04-23 2020-04-23 2020-04-23 2020-05-08 2020-05-14 2020-07-21 age at Expert Dormitory Dom ponse 0 inica China Friendship Hospit al (DCFH) DM-MAF-171359-CW-DIR / R Contingency Emergency Res 2020-11-1 etrofitting Buildings at St. Ja IDA / 62310 Post Direct Selection Direct 135,740.74 133,567.36 Completed 2020-04-30 2020-04-30 2020-05-05 2020-05-05 2020-05-19 2020-05-09 ponse 5 mes Portsmouth into COVID Facilities DM-MAF-171366-CW-DIR / In stallation of Electricity at Exp Contingency Emergency Res 2020-11-0 IDA / 62310 Post Direct Selection Direct 12,001.85 11,957.56 Completed 2020-04-30 2020-04-23 2020-04-30 2020-03-20 2020-05-12 2021-03-10 ert Dormitory Dominica Chin ponse 8 a Friendship Hospital (DCFH) DM-MAF-200111-CW-RFQ / R Restoration of Key Productiv Request for Quota Single Stage - One E 2021-06-3 ehabilitation of the North Ea IDA / D3060 e Infrastructure and Instituti Post Open - National 109,207.00 132,741.48 Signed 2020-11-06 2020-12-01 2021-01-01 2021-06-10 tions nvelope 0 st Agriculture Regional Office onal Strengthening DM-MAF-233771-CW-RFQ / P Request for Quota Restoration of the Productiv rocurement of Small Works i Request for Quota Single Stage - One E tions - Small Work 2021-09-0 IDA / D3060 e Base for the Recovery of A Post Limited 50,000.00 0.00 Canceled 2021-05-25 2021-07-06 n Support of Livestock Restor tions nvelope s (Emergency) SP 4 gricultural Livelihoods ation in the North East Agricu D -Competitive lture Region DM-MAF-203575-CW-RFB / R Restoration of Key Productiv efurbishment Works at Groun Single Stage - One E 2021-09-0 IDA / D3060 e Infrastructure and Instituti Post Request for Bids Open - National 278,859.00 0.00 Canceled 2020-11-13 2021-06-30 2020-11-18 2021-07-08 2020-12-30 2021-08-10 2021-01-29 2021-03-05 d Floor of DBMC Building - EA nvelope 1 onal Strengthening LCRP Project Implementation Unit Office Request for Bids - DM-MAF-269180-CW-RFB / R Restoration of Key Productiv Single Stage - One E Small Works SPD 2022-10-2 efurbishment Works at Groun IDA / D3060 e Infrastructure and Instituti Post Request for Bids Open - National 350,000.00 229,190.96 Signed 2022-01-28 2022-02-25 2022-02-02 2022-02-25 2022-03-04 2022-04-14 2022-04-03 2022-05-09 2022-04-27 2022-10-03 nvelope (1 envelope proce 4 d Floor of DBMC Building onal Strengthening ss) DM-MAF-71654-CW-RFQ / Re Restoration of Key Productiv Request for Quota Single Stage - One E Other (with field f 2023-02-2 construction of irrigation syst IDA / D3060 e Infrastructure and Instituti Post Limited 185,185.00 0.00 Signed 2022-07-13 2022-08-16 2022-08-27 tions nvelope or explanation) 3 ems onal Strengthening DM-MAF-325254-CW-RFB / R Request for Bids - Restoration of Key Productiv estoration of Flooring, Partiti Single Stage - One E Small Works SPD Under Imple 2023-06-1 IDA / 62310 e Infrastructure and Instituti Post Request for Bids Open - National 190,000.00 0.00 2022-11-25 2022-11-23 2022-11-30 2022-11-30 2022-12-30 2023-01-12 2023-01-13 2023-04-21 2023-02-06 ons, Doors and Electrical Wor nvelope (1 envelope proce mentation 6 onal Strengthening ks at the Central Livestock Fa ss) rm Request for Quota DM-MAF-350460-CW-DIR / Cl Restoration of Key Productiv tions - Small Work earing of landslide to grant a Pending Imp 2023-05-0 IDA / 62310 e Infrastructure and Instituti Post Direct Selection Direct - National s (Emergency) SP 4,000.00 0.00 2023-03-31 2023-04-05 2023-04-24 ccess to Segment 8 of the W lementation 8 onal Strengthening D -Non Competiti NT to facilitate audit of Trail s ve egment Request for Quota DM-MAF-352176-CW-RFQ / E Restoration of Key Productiv Request for Quota Single Stage - One E tions - Small Work Pending Imp 2023-12-1 xtension of the North-East Ag IDA / 62310 e Infrastructure and Instituti Post Open - National 110,000.00 0.00 2023-04-25 2023-06-20 tions nvelope s (Emergency) SP lementation 7 riculture Regional Office onal Strengthening D -Competitive DM-MAF-71675-CW-CDD / W Request for Bids - Restoration of Key Productiv orks for Restoration of key in Single Stage - One E Small Works SPD Pending Imp 2024-04-2 IDA / 62310 e Infrastructure and Instituti Post Request for Bids Open - National 1,434,000.00 0.00 2023-07-11 2023-07-16 2023-08-27 2023-09-26 2023-10-31 frastructure of priority segme nvelope (1 envelope proce lementation 8 onal Strengthening nts of the Waitukubuli Nation ss) al Trail Request for Propo DM-MAF-362078-CW-RFP / R Contingency Emergency Res Request for Propo Single Stage - Two E sal Design and Bu Under Imple 2024-12-0 econstruction of the National IDA / 67340 Post Open - National 1,192,000.00 0.00 2023-06-15 2023-06-15 2023-08-03 2023-08-03 2023-06-20 2023-06-21 2023-10-02 2023-11-10 2023-12-15 ponse sals nvelope ild - Works SPD (S mentation 9 Abattoir ingle-stage) Request for Quota DM-MAF-362112-CW-RFQ / E Contingency Emergency Res Request for Quota Single Stage - One E tions - Small Work Pending Imp 2024-02-0 nhancement of the Mahaut Fi IDA / D3060 Post Limited 80,000.00 0.00 2023-06-27 2023-08-13 ponse tions nvelope s (Emergency) SP lementation 9 sh Landing Site D -Competitive GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MAF-91294-GO-RFB / pur Restoration of the Productiv Open - Internationa Single Stage - One E chase of agricultural inputs t IDA / D3060 e Base for the Recovery of A Prior Request for Bids 2,500,000.00 0.00 Canceled 2019-03-25 2019-03-30 2019-05-11 2019-06-10 2019-07-15 2020-01-11 l nvelope o facilitate production gricultural Livelihoods Page 1 DM-MAF-71512-G5-RFQ / pur Restoration of the Productiv Request for Quota Single Stage - One E chase of transportation for th IDA / D3060 e Base for the Recovery of A Post Limited 100,000.00 108,487.08 Completed 2019-02-18 2019-03-26 2019-04-15 2019-08-26 2019-10-12 2019-11-01 tions nvelope e Ministry gricultural Livelihoods DM-MAF-71657-G14-RFQ / p Restoration of Key Productiv Request for Quota Single Stage - One E urchase of office furniture,fix IDA / D3060 e Infrastructure and Instituti Post Limited 100,000.00 34,908.86 Completed 2019-05-06 2019-02-21 2019-07-01 2019-05-17 2019-12-28 2019-11-01 tions nvelope tures equipment and general onal Strengthening supplies DM-MAF-97599-GO-RFQ / Pu Restoration of Key Productiv rchase of office equipment - Request for Quota Single Stage - One E IDA / D3060 e Infrastructure and Instituti Post Limited 100,000.00 91,217.62 Completed 2019-02-23 2019-04-20 2019-05-17 2019-10-17 2019-10-31 computers, telecommunicati tions nvelope onal Strengthening ons and accessories DM-MAF-71727-GO-RFB / Pro Restoration of Key Productiv Single Stage - One E curement of Hardware for Exi IDA / D3060 e Infrastructure and Instituti Post Request for Bids Open - National 300,000.00 0.00 Canceled 2019-05-14 2019-05-19 2019-06-30 2019-07-30 2019-09-03 2020-03-01 nvelope sting Agricultural Information onal Strengthening system Restoration of the Productiv DM-MAF-91291-GO-RFB / fer Open - Internationa Single Stage - One E IDA / 62310 e Base for the Recovery of A Post Request for Bids 500,000.00 0.00 Canceled 2019-01-23 2019-01-28 2019-03-11 2019-04-10 2019-05-15 2019-11-11 tilizer for crop production l nvelope gricultural Livelihoods DM-MAF-124550-GO-RFQ / P Restoration of the Productiv Request for Quota Single Stage - One E urchase of Fertilizer to restor IDA / D3060 e Base for the Recovery of A Post Limited 500,000.00 483,066.42 Completed 2019-08-02 2019-08-20 2019-09-27 2019-10-02 2020-03-25 2020-03-31 tions nvelope e crop production gricultural Livelihoods DM-MAF-124551-GO-RFB / P Restoration of the Productiv Open - Internationa Single Stage - One E urchase of Fertilizer to restor IDA / D3060 e Base for the Recovery of A Post Request for Bids 1,100,000.00 727,534.59 Completed 2019-07-28 2019-07-25 2019-08-02 2019-07-25 2019-09-13 2019-09-05 2019-10-13 2019-09-24 2019-11-17 2019-11-12 2020-05-15 2020-05-20 l nvelope e crop systems gricultural Livelihoods DM-MAF-71512-G3-RFQ / pur Restoration of the Productiv Open - Internationa Single Stage - One E chase of vegetable seeds for IDA / D3060 e Base for the Recovery of A Post Request for Bids 350,000.00 0.00 Canceled 2019-02-28 2019-03-05 2019-04-16 2019-05-16 2019-06-20 2019-12-17 l nvelope expansion of production and gricultural Livelihoods livelihoods DM-MAF-124786-GO-RFQ / P urchase of vegetable seeds, i Restoration of the Productiv Request for Quota Single Stage - One E n vitro propagated horticultu IDA / D3060 e Base for the Recovery of A Post Limited 350,000.00 142,751.66 Completed 2019-08-07 2019-08-20 2019-10-02 2019-10-12 2020-03-30 2020-06-19 tions nvelope re and traditional horticulture gricultural Livelihoods (Passion fruit seedlings) DM-MAF-71512-G2-RFQ / pur Restoration of the Productiv Open - Internationa Single Stage - One E chase seeds package for root IDA / D3060 e Base for the Recovery of A Prior Request for Bids 3,500,000.00 0.00 Canceled 2019-04-18 2019-04-23 2019-06-04 2019-07-04 2019-08-08 2020-02-04 l nvelope crop production gricultural Livelihoods DM-MAF-133047-GO-RFB / Pr Restoration of the Productiv Open - Internationa Single Stage - One E ocurement of Agriculture Inp IDA / D3060 e Base for the Recovery of A Post Request for Bids 1,000,000.00 968,718.81 Completed 2019-09-06 2019-08-22 2019-09-11 2019-09-20 2019-10-23 2019-10-31 2019-11-22 2019-12-20 2019-12-27 2020-05-21 2020-06-24 2021-03-26 l nvelope uts to Facilitate Production of gricultural Livelihoods Crops DM-MAF-133055-GO-RFQ / P Restoration of the Productiv Request for Quota Single Stage - One E rocurement of Agriculture Inp IDA / D3060 e Base for the Recovery of A Post Limited 500,000.00 490,416.00 Completed 2019-09-11 2019-08-20 2019-11-06 2019-10-15 2020-05-04 2020-03-26 tions nvelope uts to Facilitate Crop Product gricultural Livelihoods ion DM-MAF-71673-G16-RFQ / to Restoration of Key Productiv Open - Internationa Single Stage - One E ols and machinery to restore IDA / D3060 e Infrastructure and Instituti Post Request for Bids 1,100,000.00 0.00 Canceled 2019-03-22 2019-03-27 2019-05-08 2019-06-07 2019-07-12 2020-01-08 l nvelope agriculture, fisheries and For onal Strengthening estry Restoration of Key Productiv DM-MAF-71667-G15-RFQ / a Open - Internationa Single Stage - One E IDA / D3060 e Infrastructure and Instituti Post Request for Bids 500,000.00 0.00 Canceled 2019-05-22 2019-05-27 2019-07-08 2019-08-07 2019-09-11 2020-03-09 gricultural equipment l nvelope onal Strengthening DM-MAF-133072-GO-RFQ / P Restoration of the Productiv Request for Quota Single Stage - One E rocurement of Agricultural To IDA / D3060 e Base for the Recovery of A Post Limited 500,000.00 501,074.53 Signed 2019-09-11 2019-08-30 2019-11-06 2019-11-20 2020-05-04 tions nvelope ols & Equipment to facilitate gricultural Livelihoods crop production DM-MAF-133089-GO-RFQ / P Project Management and Co Request for Quota Single Stage - One E IDA / D3060 Post Limited 30,000.00 29,347.27 Completed 2019-09-13 2019-10-07 2019-11-08 2019-10-30 2020-05-06 2020-03-26 rocurement of Additional Fur ordination tions nvelope niture DM-MAF-71512-G12-RFQ / c Restoration of Key Productiv entral livestock restoration - Request for Quota Single Stage - One E IDA / D3060 e Infrastructure and Instituti Post Open - National 100,000.00 0.00 Canceled 2019-03-12 2019-05-07 2019-11-03 materials including lumber, c tions nvelope onal Strengthening ement, galvanise, and fencin g. DM-MAF-138648-GO-RFQ / P Restoration of the Productiv rocurement of Passion Fruit S Request for Quota Single Stage - One E IDA / D3060 e Base for the Recovery of A Post Limited 10,000.00 9,225.09 Completed 2019-10-04 2019-10-07 2019-11-29 2020-02-22 2020-05-27 2020-06-20 eedlings for Expansion of Pr tions nvelope gricultural Livelihoods oduction and Restoring of Liv elihoods DM-MAF-141401-GO-RFQ / P Restoration of the Productiv Request for Quota Single Stage - One E rocurement of Containers for IDA / D3060 e Base for the Recovery of A Post Limited 25,000.00 28,782.29 Completed 2019-10-29 2019-11-14 2019-12-24 2020-03-18 2020-06-21 2020-04-09 tions nvelope Storage and Distribution of A gricultural Livelihoods gricltural Inputs DM-MAF-143910-GO-RFQ / P rocurement of Warehouse In Restoration of the Productiv Request for Quota Single Stage - One E ventory System to Manage St IDA / D3060 e Base for the Recovery of A Post Limited 50,000.00 25,542.20 Signed 2019-11-11 2019-11-08 2020-01-06 2020-01-29 2020-07-04 tions nvelope orage and Distribution of Agri gricultural Livelihoods cultural Inputs to EALCRP Be neficiaries DM-MAF-141412-GO-RFB / Pr Restoration of the Productiv Open - Internationa Single Stage - One E ocurement of Outboard Engi IDA / D3060 e Base for the Recovery of A Post Request for Bids 650,000.00 648,723.25 Completed 2019-10-24 2020-01-17 2019-10-29 2020-01-17 2019-12-10 2020-03-04 2020-01-09 2020-03-04 2020-02-13 2020-08-14 2020-08-11 2021-07-01 l nvelope nes for the Restoration of Fis gricultural Livelihoods heries Livelihoods DM-MAF-170055-GO-DIR / Pr Contingency Emergency Res ocurement and installation of IDA / 62310 Post Direct Selection Direct 273,600.00 291,085.00 Completed 2020-04-22 2020-04-22 2020-04-27 2020-05-08 2020-06-01 2020-05-29 2020-11-28 2020-09-03 ponse Isolation Units to combat CO VID 19 DM-MAF-170062-GO-RFQ / P rocurement of Intensive Unit Contingency Emergency Res Request for Quota Single Stage - One E IDA / 62310 Post Limited 179,131.18 0.00 Canceled 2020-04-28 2020-06-19 2020-12-16 Healthcare Equipment for the ponse tions nvelope COVID Center at Portsmouth DM-MAF-170176-GO-RFQ / P rocurement of Medical Suppl ies including PPEs for Frontlin Contingency Emergency Res Request for Quota Single Stage - One E IDA / 62310 Post Limited 1,135,637.98 0.00 Canceled 2020-04-28 2020-06-19 2020-12-16 e Extension Officers PIU War ponse tions nvelope ehouse Staff and Healthcare workers to Mitigate against C OVID 19 DM-MAF-170067-GO-RFQ / P rocurement of Healthcare Su Contingency Emergency Res Request for Quota Single Stage - One E pplies and Materials for the I IDA / 62310 Post Limited 321,141.87 315,324.92 Completed 2020-04-27 2020-11-27 2020-06-09 2021-06-26 2020-12-06 2022-01-05 ponse tions nvelope ntensive Care and In-patient Units of the COVID Center at Portsmouth Page 2 DM-MAF-170069-GO-RFQ / P rocurement of IT equipment f Contingency Emergency Res Request for Quota Single Stage - One E IDA / 62310 Post Limited 19,244.67 22,291.48 Completed 2020-04-23 2020-05-22 2020-05-31 2020-09-01 2020-11-27 2020-12-01 or Health EOC monitoring du ponse tions nvelope ring the COVID 19 pandemic DM-MAF-171292-GO-DIR / Pr ocurement of Intensive Unit Contingency Emergency Res IDA / 62310 Post Direct Selection Direct 149,131.18 149,000.00 Completed 2020-04-30 2020-04-30 2020-05-03 2020-05-28 2020-05-12 2020-06-27 2020-11-08 2021-07-06 Healthcare Equipment for CO ponse VID Center at Portsmouth DM-MAF-171295-GO-DIR / Pr ocurement of PPEs for Frontli Contingency Emergency Res IDA / 62310 Post Direct Selection Direct 1,009,762.68 1,009,762.68 Completed 2020-04-30 2020-04-30 2020-05-05 2020-05-08 2020-05-19 2020-05-19 2020-11-15 2020-07-07 ne Healthcare workers to Miti ponse gate against COVID 19 DM-MAF-171296-GO-DIR / Pr Contingency Emergency Res ocurement of Medical Suppli IDA / 62310 Post Direct Selection Direct 120,875.30 120,875.30 Completed 2020-04-30 2020-04-30 2020-05-05 2020-05-08 2020-05-26 2020-05-14 2020-11-22 2020-07-17 ponse es for the Central Medical Sto re DM-MAF-171383-GO-DIR / Pr ocurement of Hospital Beds t Contingency Emergency Res IDA / 62310 Post Direct Selection Direct 30,000.00 30,000.00 Completed 2020-04-30 2020-04-30 2020-05-05 2020-05-08 2020-05-19 2020-05-19 2020-11-15 2020-12-02 o Augment Capacity of Inten ponse sive Care Unit at the St. Jame s COVID Center DM-MAF-170095-GO-RFQ / P Contingency Emergency Res Request for Quota rocurement of Feed to provi IDA / 62310 Post 75,870.00 80,345.83 Completed 2020-05-02 2020-06-14 2020-06-23 2020-07-29 2020-12-20 2021-05-14 ponse tions de Input Support to Livestock Producers DM-MAF-175742-GO-DIR / Pr ocurement of Broiler Chicks f Contingency Emergency Res IDA / 62310 Post Direct Selection Direct 19,500.00 26,100.00 Completed 2020-05-29 2020-05-29 2020-06-03 2020-07-03 2020-06-19 2020-07-21 2021-02-28 2021-05-05 or Distribution to EALCRP-CE ponse RC Livestock Beneficiary Far mers DM-MAF-175945-GO-DIR / Pr ocurement of Seeds to Facilit Contingency Emergency Res IDA / 62310 Post Direct Selection Direct 92,593.00 38,013.28 Completed 2020-05-29 2020-05-29 2020-06-01 2020-06-05 2020-06-30 2020-06-19 2020-12-27 2020-10-28 ate Strengthening of Micro F ponse arming Systems in Dominica DM-MAF-175946-GO-RFQ / P rocurement of Seedling Prop agation Supplies for Impleme Contingency Emergency Res Request for Quota Single Stage - One E IDA / 62310 Post Limited 12,037.00 12,053.36 Completed 2020-06-01 2020-06-18 2020-07-09 2020-07-21 2021-01-05 2020-10-02 ntation of the Strengthening ponse tions nvelope of Micro -farms/ Micro-garden Systems Component of the E ALCRP-CERC DM-MAF-175954-GO-RFQ / P rocurement of Computers an Restoration of Key Productiv Request for Quota Single Stage - One E d Accessories for the Ministry IDA / D3060 e Infrastructure and Instituti Post Limited 100,000.00 105,680.83 Signed 2020-06-05 2020-07-06 2020-07-31 2021-01-22 2021-01-27 tions nvelope of Blue and Green Economy, onal Strengthening Agriculture & National Food S ecurity DM-MAF-133149-GO-RFB / Pr Restoration of the Productiv Open - Internationa Single Stage - One E ocurement of Agricultural To IDA / D3060 e Base for the Recovery of A Prior Request for Bids 2,100,000.00 0.00 Canceled 2019-09-10 2020-06-04 2019-09-15 2020-06-29 2019-10-27 2020-08-05 2019-11-26 2019-12-31 2020-06-28 l nvelope ols & Equipment for Crop Pr gricultural Livelihoods oduction DM-MAF-200115-GO-RFB / Pr Restoration of the Productiv Open - Internationa Single Stage - One E ocurement of Agricultural To IDA / D3060 e Base for the Recovery of A Post Request for Bids 2,100,000.00 1,661,069.56 Signed 2020-11-09 2020-11-09 2020-11-14 2020-12-09 2020-12-26 2021-02-04 2021-01-25 2021-02-18 2021-03-01 2021-04-20 2021-08-28 l nvelope ols gricultural Livelihoods DM-MAF-201606-GO-DIR / Pr Restoration of the Productiv ocurement of Canoes for Fish IDA / D3060 e Base for the Recovery of A Post Direct Selection Direct 50,000.00 26,568.27 Signed 2020-11-13 2020-11-06 2020-11-18 2020-12-09 2020-12-27 2021-04-22 2021-09-24 er Folk Canoe Replacements gricultural Livelihoods DM-MAF-223164-GO-RFQ / S Restoration of the Productiv upplies and Materials for the Request for Quota Single Stage - One E IDA / D3060 e Base for the Recovery of A Post Open - National 100,000.00 63,501.87 Signed 2021-04-05 2021-10-19 2021-05-31 2022-02-26 2021-11-27 Construction of Plug and Mol tions nvelope gricultural Livelihoods ds towards building resilient FRP Fishing Boats. DM-MAF-227065-GO-RFQ / P Restoration of the Productiv Request for Quota Single Stage - One E rocurement of Additional Fert IDA / D3060 e Base for the Recovery of A Post Limited 800,000.00 722,094.08 Completed 2021-04-05 2021-04-14 2021-05-31 2021-07-31 2021-11-27 2022-02-05 tions nvelope ilizers for Distribution to EAL gricultural Livelihoods CRP Beneficiaries DM-MAF-227064-GO-RFQ / P Restoration of the Productiv rocurement of Agro-Chemical Request for Quota Single Stage - One E IDA / D3060 e Base for the Recovery of A Post Limited 100,000.00 99,993.54 Signed 2021-04-05 2021-04-12 2021-05-31 2021-06-26 2021-11-27 s for Distribution to Beneficia tions nvelope gricultural Livelihoods ries of the EALCRP DM-MAF-71512-G4-RFQ / Pur Restoration of the Productiv Open - Internationa Single Stage - One E chase of materials to suppor IDA / D3060 e Base for the Recovery of A Post Request for Bids 350,000.00 0.00 Canceled 2021-04-30 2021-05-05 2021-06-16 2021-07-16 2021-08-20 2022-02-16 l nvelope t Livestock restoration gricultural Livelihoods DM-MAF-233769-GO-RFQ / P Restoration of the Productiv urchase of Materials to Supp Request for Quota Single Stage - One E IDA / D3060 e Base for the Recovery of A Post Open - National 300,000.00 285,582.74 Signed 2021-05-25 2021-06-25 2021-07-20 2021-10-20 2022-01-16 ort Livestock Restoration in t tions nvelope gricultural Livelihoods he North-East Agriculture Re gion DM-MAF-138647-GO-RFQ / P Restoration of the Productiv rocurement of Invitro Propag Request for Quota Single Stage - One E IDA / D3060 e Base for the Recovery of A Post Limited 50,800.00 0.00 Canceled 2019-10-04 2020-01-20 2019-11-29 2020-05-27 ated Horticulture Crops for e tions nvelope gricultural Livelihoods xpansion of production and r estoring of livelihoods DM-MAF-233772-GO-RFQ / P Restoration of the Productiv Request for Quota Single Stage - One E rocurement of PPEs to facilita IDA / D3060 e Base for the Recovery of A Post Limited 8,000.00 4,616.24 Completed 2021-07-20 2021-07-05 2021-08-25 2021-09-30 2021-09-16 2021-11-27 tions nvelope te boat building training gricultural Livelihoods DM-MAF-71512-G9-RFQ / pur Restoration of Key Productiv chase of building materials fo Request for Quota Single Stage - One E IDA / D3060 e Infrastructure and Instituti Post Limited 100,000.00 0.00 Canceled 2018-07-30 2020-09-25 2018-09-24 2019-03-23 r the construction of resilient tions nvelope onal Strengthening livestock structures DM-MAF-234080-GO-RFB / Pr Restoration of the Productiv Open - Internationa Single Stage - One E ocurement of Motorized Agric IDA / D3060 e Base for the Recovery of A Post Request for Bids 389,956.00 444,625.60 Signed 2021-08-31 2021-08-31 2021-09-05 2021-09-07 2021-10-17 2021-10-19 2021-11-16 2021-10-20 2021-12-14 2022-04-13 2022-03-24 l nvelope ultural Tools gricultural Livelihoods DM-MAF-253895-GO-RFQ / C Restoration of the Productiv onstruction Materials to Supp Request for Quota Single Stage - One E IDA / D3060 e Base for the Recovery of A Post Limited 70,000.00 96,912.75 Signed 2021-10-05 2021-10-04 2021-11-26 2022-03-14 2022-01-25 ort Livestock Restoration in t tions nvelope gricultural Livelihoods he North-East Agriculture Re gion Page 3 DM-MAF-170091-GO-RFQ / P rocurement of Medical Labor Contingency Emergency Res Request for Quota Single Stage - One E atory Supplies for increased IDA / 62310 Post Limited 19,243.70 0.00 Canceled 2020-04-24 2020-11-16 2020-06-01 2020-11-28 ponse tions nvelope laboratory capacity for PCR t esting of the SARSs-COV-2 vi rus DM-MAF-271491-GO-RFQ / P rocurement of Additional Roo Restoration of the Productiv Request for Quota Single Stage - One E fing Material for Beneficiary L IDA / D3060 e Base for the Recovery of A Post Limited 50,000.00 32,632.42 Completed 2022-01-25 2022-02-17 2022-03-11 2022-05-25 2022-09-07 2022-06-28 tions nvelope ivestock Farmers of the Nort gricultural Livelihoods h East -Agriculture Region Restoration of the Productiv DM-MAF-240923-GO-RFQ / S Request for Quota Single Stage - One E IDA / D3060 e Base for the Recovery of A Post Open - National 48,158.00 58,404.06 Signed 2022-02-20 2022-02-24 2022-04-17 2022-06-02 2022-08-22 upply of Bee Packages tions nvelope gricultural Livelihoods DM-MAF-269417-GO-RFQ / F Restoration of the Productiv Single Stage - One E encing Material for Small Ru IDA / D3060 e Base for the Recovery of A Post Request for Bids Open - National 150,000.00 129,855.00 Signed 2022-04-30 2022-05-23 2022-05-05 2022-05-24 2022-06-16 2022-06-21 2022-07-16 2022-06-27 2022-08-20 2022-08-29 2023-02-16 nvelope minants gricultural Livelihoods Restoration of the Productiv DM-MAF-272942-GO-RFB / Fl Single Stage - One E IDA / D3060 e Base for the Recovery of A Post Request for Bids Open - National 200,000.00 271,925.00 Signed 2022-04-30 2022-05-23 2022-05-05 2022-05-23 2022-06-16 2022-06-23 2022-07-16 2022-06-27 2022-08-09 2022-09-16 2023-02-05 ooring for Livestock Housing nvelope gricultural Livelihoods DM-MAF-289771-GO-DIR / Pr Restoration of Key Productiv ocurement of 50cm Satellite I IDA / D3060 e Infrastructure and Instituti Post Direct Selection Direct 20,000.00 15,000.00 Signed 2022-04-24 2022-04-24 2022-04-29 2022-04-29 2022-05-14 2022-05-19 2022-06-13 mage for the Island of Domin onal Strengthening ica Restoration of the Productiv DM-MAF-300967-GO-RFQ / E Request for Quota Single Stage - One E Under Imple IDA / D3060 e Base for the Recovery of A Post Open - National 50,000.00 0.00 2022-07-27 2022-07-25 2022-09-10 2022-11-09 quipment for Boat Builders tions nvelope mentation gricultural Livelihoods DM-MAF-289799-GO-RFB / B Restoration of the Productiv uilding Materials for Construc Single Stage - One E Under Imple IDA / D3060 e Base for the Recovery of A Post Request for Bids Open - National 1,000,000.00 0.00 2022-08-05 2022-08-05 2022-08-10 2022-08-11 2022-09-21 2022-09-21 2022-10-21 2022-11-25 2023-05-24 tion of Resilient Structures to nvelope mentation gricultural Livelihoods Support Livestock Restoratio n in Dominica DM-MAF-306282-GO-RFB / M Restoration of the Productiv Single Stage - One E Under Imple aterials for Construction of R IDA / D3060 e Base for the Recovery of A Post Request for Bids Open - National 550,000.00 0.00 2022-08-08 2022-08-08 2022-08-13 2022-08-13 2022-09-24 2022-10-21 2022-10-24 2022-11-25 2022-11-28 2023-05-27 nvelope mentation esilient FRP Boats gricultural Livelihoods DM-MAF-232555-GO-RFQ / B Restoration of the Productiv Request for Quota Single Stage - One E uilding Materials for the Cons IDA / D3060 e Base for the Recovery of A Post Open - National 100,000.00 0.00 Canceled 2021-05-19 2021-06-25 2021-07-14 2022-01-10 tions nvelope truction of Resilient Livestock gricultural Livelihoods Structures DM-MAF-324506-GO-RFQ / P Restoration of Key Productiv Request for Quota Single Stage - One E rocurement of Soil Test Kits f IDA / D3060 e Infrastructure and Instituti Post Limited 60,000.00 0.00 Signed 2022-11-20 2022-11-20 2023-01-08 2023-04-30 tions nvelope or the Division of Agriculture onal Strengthening DM-MAF-325256-GO-RFB / C Restoration of the Productiv Single Stage - One E Under Imple onstruction Materials to Supp IDA / D3060 e Base for the Recovery of A Post Request for Bids Open - National 350,000.00 0.00 2022-11-15 2022-11-15 2022-11-20 2022-11-17 2022-12-20 2023-01-18 2023-01-03 2023-02-07 2023-01-27 2023-06-15 nvelope mentation ort Zone 2 Livestock Farmers gricultural Livelihoods DM-MAF-141190-GO-RFB / Pr Restoration of Key Productiv Open - Internationa Single Stage - One E ocurement of Agriculture Ma IDA / D3060 e Infrastructure and Instituti Post Request for Bids 150,000.00 0.00 Canceled 2019-10-24 2021-06-30 2019-10-29 2021-06-30 2019-12-10 2021-08-13 2020-01-09 2020-02-13 2020-08-11 l nvelope nagement Information Syste onal Strengthening m Equipment DM-MAF-360235-GO-RFQ / E quipment and Materials for P Contingency Emergency Res Request for Quota Single Stage - One E Pending Impl IDA / D3060 Post Open - National 62,000.00 0.00 2023-07-15 2023-09-09 2024-03-07 ork and Poultry Operations of ponse tions nvelope ementation Livestock Beneficiaries DM-MAF-360260-GO-RFQ / P rocurement of Greenhouses t Contingency Emergency Res Request for Quota Open - Internationa Single Stage - One E Pending Impl IDA / D3060 Post 800,000.00 0.00 2023-07-11 2023-09-05 2024-03-03 o Support Enhancement of C ponse tions l nvelope ementation limate Smart Production of N ontraditional Crops DM-MAF-360331-GO-RFQ / P Contingency Emergency Res Request for Quota Single Stage - One E Pending Impl rocurement of Irrigation and IDA / D3060 Post Open - National 400,000.00 0.00 2023-07-10 2023-09-04 2024-03-02 ponse tions nvelope ementation Related Agricultural Supplies DM-MAF-99435-GO-RFQ / Eq Restoration of Key Productiv Request for Quota Open - Internationa Single Stage - One E Pending Impl uipment for restoration of CL IDA / D3060 e Infrastructure and Instituti Post 100,000.00 0.00 2023-08-04 2023-09-29 2024-03-27 tions l nvelope ementation F onal Strengthening DM-MAF-289756-GO-RFQ / C onstruction Materials to Supp Restoration of the Productiv Request for Quota Single Stage - One E ort Complete Restoration of L IDA / D3060 e Base for the Recovery of A Post Limited 55,000.00 0.00 Canceled 2022-04-27 2022-04-29 2022-06-07 2022-08-06 tions nvelope ivestock Structures of Benefi gricultural Livelihoods ciary Farmers in the North-Ea st Agriculture Region DM-MAF-362081-GO-RFQ / S Contingency Emergency Res Request for Quota Single Stage - One E Pending Impl IDA / 67340 Post Open - National 150,000.00 0.00 2023-07-25 2023-09-19 2024-03-17 trengthening Hatchery Opera ponse tions nvelope ementation tions DM-MAF-362082-GO-RFQ / R Contingency Emergency Res Request for Quota Single Stage - One E Pending Impl estoration of Farm Sheds for IDA / D3060 Post Open - National 75,000.00 0.00 2023-06-28 2023-08-23 2024-02-19 ponse tions nvelope ementation Beneficiary Banana/Plantain Farmers DM-MAF-362085-GO-DIR / Pr Contingency Emergency Res Pending Impl ocurement of Tissue Culture IDA / D3060 Post Direct Selection Direct - National 40,000.00 0.00 2023-06-18 2023-06-23 2023-07-28 2024-01-24 ponse ementation Banana Plants DM-MAF-362182-GO-RFQ / E Contingency Emergency Res Request for Quota Single Stage - One E Pending Impl quipment/Supplies & Material IDA / D3060 Post Open - National 170,000.00 0.00 2023-07-05 2023-08-21 2023-12-09 ponse tions nvelope ementation s for Fish landing Sites DM-MAF-362188-GO-RFQ / P Contingency Emergency Res Request for Quota Single Stage - One E Pending Impl rocurement of Packaging Ma IDA / D3060 Post Open - National 200,000.00 0.00 2023-07-26 2023-09-11 2023-12-10 ponse tions nvelope ementation terial for Fresh Produce Expo rts DM-MAF-362234-GO-RFQ / E Contingency Emergency Res Request for Quota Open - Internationa Single Stage - One E Pending Impl IDA / D3060 Post 100,000.00 0.00 2023-08-02 2023-09-18 2024-03-16 stablishment of Marketing De ponse tions l nvelope ementation spot DM-MAF-362242-GO-RFB / E Contingency Emergency Res Single Stage - One E Pending Impl quipment and Packaging Mat IDA / D3060 Post Request for Bids Open - National 800,000.00 0.00 2023-08-22 2023-08-27 2023-10-08 2023-10-22 2023-11-17 2024-05-15 ponse nvelope ementation erial for Agro Processors DM-MAF-362360-GO-RFQ / P Contingency Emergency Res Request for Quota Single Stage - One E Pending Impl urchase of Vehicles to enhan IDA / D3060 Post Limited 151,000.00 0.00 2023-06-05 2023-07-11 2023-08-30 ponse tions nvelope ementation ce delivery of Services of Ext ension Services Page 4 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MAF-306281-NC-DIR / U Restoration of Key Productiv Pending Impl pgrade to Size of Water Conn IDA / 62310 e Infrastructure and Instituti Post Direct Selection Direct - National 8,000.00 0.00 2022-08-05 2022-08-10 2022-09-07 2022-09-27 ementation ection for the Woodford Hill A onal Strengthening griculture Station DM-MAF-101000-NC-RFP / R Restoration of Key Productiv Single Stage - One E ehabilitation of boats to incre IDA / D3060 e Infrastructure and Instituti Post Request for Bids Open - National 880,000.00 0.00 Canceled 2022-09-30 2022-10-05 2022-10-08 2022-11-07 2022-12-12 2023-06-10 nvelope ase fish production onal Strengthening Restoration of Key Productiv DM-MAF-240310-NC-RFB / A Open - Internationa Single Stage - One E Pending Impl IDA / D3060 e Infrastructure and Instituti Post Request for Bids 300,000.00 0.00 2023-05-25 2023-05-30 2023-07-11 2023-08-10 2023-09-14 2024-03-12 gricultural census l nvelope ementation onal Strengthening CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MAF-71726-CS-LCS / fina Project Management and Co Least Cost Selecti IDA / D3060 Post Open - National 150,000.00 29,431.73 Completed 2019-07-02 2019-08-15 2019-07-23 2019-09-06 2019-09-05 2019-10-17 2019-10-03 2019-12-05 2019-11-02 2019-12-05 2019-12-07 2020-04-23 2020-01-11 2020-10-29 2020-07-09 2021-02-12 ncial Audit ordination on DM-MAF-138893-CS-CQS / W Restoration of Key Productiv Consultant Qualifi ildlife Survey Needs Assseme IDA / D3060 e Infrastructure and Instituti Post Limited 48,000.00 47,940.00 Signed 2019-10-09 2019-10-18 2019-10-23 2019-11-28 2019-11-22 2020-02-14 2019-12-27 2021-02-06 2020-06-24 cation Selection nt and Design onal Strengthening DM-MAF-101846-CS-QBS / C Restoration of the Productiv onsultant Services for Design Consultant Qualifi IDA / D3060 e Base for the Recovery of A Post Open - National 100,000.00 0.00 Canceled 2019-04-30 2019-05-21 2019-07-04 2019-08-03 2019-09-07 2020-03-05 and Supervision of Civil Work cation Selection gricultural Livelihoods s for reopening the WNT DM-MAF-71727-CS-LCS / tec Project Management and Co Least Cost Selecti IDA / D3060 Post Open - National 100,000.00 0.00 Canceled 2019-07-01 2019-07-22 2019-09-04 2019-10-02 2019-11-01 2019-12-06 2020-01-10 2020-07-08 hnical audits and surveys ordination on DM-MAF-71678-CS-QCBS / A Restoration of Key Productiv Quality And Cost- Open - Internationa nalytical work for long term d IDA / D3060 e Infrastructure and Instituti Post 671,640.00 0.00 Canceled 2019-06-03 2019-06-24 2019-08-07 2019-09-04 2019-10-04 2019-11-08 2019-12-13 2020-12-12 Based Selection l elivery of Ecosystems onal Strengthening DM-MAF-71517-CS-QCBS / d Restoration of Key Productiv Quality And Cost- Open - Internationa evelopment services for tran IDA / D3060 e Infrastructure and Instituti Post 850,000.00 0.00 Canceled 2018-10-01 2018-10-22 2018-12-05 2019-01-02 2019-02-01 2019-03-08 2019-04-12 2020-04-11 Based Selection l sfer of agric business knowle onal Strengthening dge Restoration of Key Productiv DM-MAF-71518-CS-CQS / An Consultant Qualifi IDA / D3060 e Infrastructure and Instituti Post Open - National 150,000.00 0.00 Canceled 2021-06-28 2021-07-19 2021-09-01 2021-10-01 2021-11-05 2022-05-04 alytical work for value chains cation Selection onal Strengthening DM-MAF-222644-CS-QCBS / Consultancy for Engineering Restoration of Key Productiv Quality And Cost- Open - Internationa Design and Supervision of th IDA / D3060 e Infrastructure and Instituti Post 350,000.00 0.00 Signed 2021-03-26 2021-06-29 2021-04-16 2021-09-16 2021-05-30 2021-11-30 2021-06-27 2022-01-28 2021-07-27 2022-02-14 2021-08-31 2022-04-05 2021-10-05 2022-10-05 Based Selection l e Works for Restoration of Ke onal Strengthening y Infrastructure in Agriculture , Livestock, and Forestry DM-MAF-147267-CS-CQS / C onsultant Services for Design Restoration of Key Productiv Consultant Qualifi and Supervision of Civil Work IDA / D3060 e Infrastructure and Instituti Post Limited 180,000.00 0.00 Canceled 2019-11-26 2020-01-21 2019-12-10 2020-07-03 2020-01-09 2020-02-13 2020-08-11 cation Selection s for reopening of the Waituk onal Strengthening ubuli National Trail (WNT) DM-MAF-240924-CS-LCS / Fi Project Management and Co Least Cost Selecti Open - Internationa IDA / D3060 Post 50,000.00 16,200.00 Signed 2021-08-17 2021-08-17 2021-09-07 2021-09-16 2021-09-21 2021-10-25 2021-10-05 2021-12-07 2021-10-12 2022-01-18 2021-10-18 2022-02-10 2021-11-18 2022-03-12 2022-02-06 nancial Audit 2020/2021 to 2 ordination on l 021/2022 DM-MAF-240928-CS-CQS / C onsultant Services for Audit, Restoration of Key Productiv Consultant Qualifi Design and Supervision of Ci IDA / D3060 e Infrastructure and Instituti Post Open - National 200,000.00 205,860.61 Signed 2021-08-31 2021-09-12 2021-09-21 2021-09-17 2021-10-19 2021-11-26 2021-11-02 2021-12-21 2021-11-26 2022-07-12 2022-02-14 cation Selection vil Works for Rehabilitation of onal Strengthening the Waitukubuli National Trai l (WNT) DM-MAF-303253-CS-CQS / Ir Restoration of Key Productiv Consultant Qualifi Under Implement rigation Sites Audits and Fea IDA / 62310 e Infrastructure and Instituti Post Open - National 50,000.00 0.00 2022-08-08 2022-08-08 2022-08-29 2022-11-21 2022-10-12 2022-11-11 2022-12-16 2023-03-31 cation Selection ation sibility Study Services onal Strengthening DM-MAF-362240-CS-CQS / T echnical Assistance towards Contingency Emergency Res Consultant Qualifi Open - Internationa Pending Impleme IDA / D3060 Post 50,000.00 0.00 2023-07-05 2023-07-26 2023-08-23 2023-09-22 2023-10-18 2024-04-15 Establishment of Marketing ponse cation Selection l ntation Despots in the Leeward Islan ds INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DM-MAF-71516-CS-INDV / te Restoration of Key Productiv Individual Consult chnical support for assistanc IDA / D3060 e Infrastructure and Instituti Post Open 150,000.00 22,250.00 Completed 2018-07-27 2019-08-20 2018-09-14 2019-10-28 2018-10-05 2019-10-29 2018-11-09 2019-10-30 2019-05-08 2020-03-05 ant Selection e to the design and construct onal Strengthening ion of boats DM-MAF-71722-CS-INDV / pr Project Management and Co Individual Consult IDA / D3060 Post Open 192,000.00 132,841.33 Signed 2018-08-01 2018-09-19 2018-09-18 2018-10-10 2018-09-18 2018-11-14 2018-10-05 2019-05-13 oject manager ordination ant Selection DM-MAF-71725-CS-INDV / M Project Management and Co Individual Consult IDA / D3060 Post Open 120,000.00 0.00 Under Review 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 &E/Agricultural IT specialists ordination ant Selection DM-MAF-71726-CS-INDV / Ag Project Management and Co Individual Consult IDA / D3060 Post Open 57,600.00 86,346.87 Signed 2018-09-03 2019-02-15 2018-10-22 2019-05-31 2018-11-12 2019-05-31 2018-12-17 2019-06-13 2019-06-15 ricultural specialists ordination ant Selection DM-MAF-71727-CS-INDV / po Project Management and Co Individual Consult IDA / D3060 Post Open 200,000.00 150,000.00 Completed 2018-09-03 2020-08-11 2018-10-22 2020-09-24 2018-11-12 2020-09-24 2018-12-17 2020-09-25 2019-06-15 2021-06-26 rtfolio manager ordination ant Selection DM-MAF-71729-CS-INDV / F Project Management and Co Individual Consult IDA / D3060 Post Open 200,000.00 150,000.00 Completed 2018-09-03 2020-08-11 2018-10-22 2020-09-24 2018-11-12 2020-09-24 2018-12-17 2020-09-25 2019-06-15 2021-06-26 M Specialists(IST) ordination ant Selection Page 5 Restoration of Key Productiv DM-MAF-71724-CS-INDV / ci Individual Consult IDA / D3060 e Infrastructure and Instituti Post Open 60,000.00 0.00 Canceled 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 vil engineer ant Selection onal Strengthening DM-MAF-71721-CS-INDV / so Project Management and Co Individual Consult IDA / D3060 Post Open 100,000.00 0.00 Canceled 2018-08-01 2018-09-19 2018-10-10 2018-11-14 2019-05-13 cial safeguards officer ordination ant Selection DM-MAF-71731-CS-INDV / so Project Management and Co Individual Consult IDA / D3060 Post Open 200,000.00 150,000.00 Completed 2018-09-03 2020-08-11 2018-10-22 2020-09-24 2018-11-12 2020-09-24 2018-12-17 2020-09-25 2023-05-31 2021-06-26 cial safeguards IST ordination ant Selection DM-MAF-71728-CS-INDV / pr Project Management and Co Individual Consult IDA / D3060 Post Open 200,000.00 127,500.00 Completed 2018-09-03 2020-08-11 2018-10-22 2020-09-24 2018-11-12 2020-09-24 2018-12-17 2020-09-25 2023-05-31 2021-06-26 ocurement(IST) ordination ant Selection DM-MAF-71730-CS-INDV / en Project Management and Co Individual Consult IDA / D3060 Post Open 200,000.00 0.00 Canceled 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2023-05-31 vironmental safeguards(IST) ordination ant Selection DM-MAF-87854-CS-INDV / Ex Project Management and Co Individual Consult IDA / D3060 Post Open 75,000.00 66,420.66 Signed 2019-02-08 2019-02-19 2019-03-29 2019-05-31 2019-04-19 2019-05-31 2019-05-24 2019-06-05 2023-06-30 ecutive Assistant ordination ant Selection DM-MAF-87852-CS-INDV / M Project Management and Co Individual Consult IDA / D3060 Post Open 135,000.00 50,184.50 Terminated 2019-02-08 2019-02-11 2019-03-29 2019-05-31 2019-04-19 2019-05-31 2019-05-24 2019-06-06 2023-06-30 onitoring and Evaluation Offi ordination ant Selection cer DM-MAF-87851-CS-INDV / Pr Project Management and Co Individual Consult IDA / D3060 Post Open 160,000.00 106,273.07 Signed 2019-02-08 2019-02-08 2019-03-29 2019-05-31 2019-04-19 2019-06-04 2019-05-24 2019-06-16 2023-06-30 ocurement Officer ordination ant Selection DM-MAF-87849-CS-INDV / En Restoration of Key Productiv Individual Consult vironmental Safeguards Offic IDA / D3060 e Infrastructure and Instituti Post Open 125,000.00 92,988.93 Signed 2019-02-08 2019-02-08 2019-03-29 2019-05-31 2019-04-19 2019-06-06 2019-05-24 2019-06-07 2023-06-30 ant Selection er onal Strengthening DM-MAF-87853-CS-INDV / Co Project Management and Co Individual Consult IDA / D3060 Post Open 100,000.00 61,992.62 Completed 2019-02-08 2019-02-08 2019-03-29 2019-05-31 2019-04-19 2019-03-28 2019-05-24 2019-06-14 2023-06-30 2021-05-31 mmunications Officer ordination ant Selection DM-MAF-87850-CS-INDV / Fi Project Management and Co Individual Consult IDA / D3060 Post Open 155,000.00 106,273.06 Signed 2019-02-15 2019-02-15 2019-04-05 2019-05-31 2019-04-26 2019-06-05 2019-05-31 2019-06-05 2023-06-30 nancial Management Officer ordination ant Selection DM-MAF-94794-CS-CDS / For Restoration of Key Productiv estry Officer - focal point in t Individual Consult IDA / D3060 e Infrastructure and Instituti Post Open 60,000.00 71,033.21 Signed 2019-02-22 2019-02-04 2019-04-12 2019-05-31 2019-05-03 2019-05-31 2019-06-07 2019-06-15 2021-06-30 he PIU responsible for all For ant Selection onal Strengthening estry related activities DM-MAF-94792-CS-CDS / Fis Restoration of Key Productiv Individual Consult heries Officer - focal point in IDA / D3060 e Infrastructure and Instituti Post Open 60,000.00 48,708.48 Completed 2019-02-15 2019-02-15 2019-04-05 2019-05-31 2019-04-26 2019-05-31 2019-05-31 2019-06-08 2021-06-30 2021-06-03 ant Selection the PIU for all Fisheries relate onal Strengthening d activities DM-MAF-101001-CS-INDV / P roject Implementation Suppo Project Management and Co Individual Consult rt Advisor - to facilitate the e IDA / D3060 Post Open 60,000.00 0.00 Canceled 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2019-11-30 ordination ant Selection xecution of project activities i n a timely and effective man ner DM-MAF-118578-CS-CDS / Pr oject Implementation Suppor Project Management and Co t Advisor (PISA) to facilitate ti IDA / D3060 Post Direct Selection Direct 100,000.00 46,350.00 Completed 2019-06-24 2019-06-24 2019-07-04 2019-06-28 2019-09-07 2019-07-01 2020-03-05 2020-03-23 ordination mely execution of Project in an effective and efficient ma nner. DM-MAF-138613-CS-INDV / A griculture Information Techn ology Officer will assume full Project Management and Co Individual Consult responsibility for managing a IDA / D3060 Post Limited 120,000.00 53,136.53 Terminated 2019-10-04 2019-09-27 2019-10-04 2019-10-04 2019-10-25 2019-11-29 2019-11-29 2020-05-15 2020-05-27 ordination ant Selection nd overseeing the informatio n management and monitori ng function of the project at all levels DM-MAF-133076-CS-CDS / Ci Project Management and Co Individual Consult vil Engineer for infrastructure IDA / D3060 Post Limited 150,000.00 61,992.62 Signed 2019-10-04 2019-08-16 2019-10-07 2019-10-04 2019-10-28 2019-11-29 2019-12-02 2020-04-08 2020-05-30 ordination ant Selection , building, surfacing and pavi ng services Restoration of Key Productiv DM-MAF-94791-CS-INDV / Ci Individual Consult IDA / D3060 e Infrastructure and Instituti Post Open 150,000.00 0.00 Canceled 2019-02-08 2019-02-08 2019-03-29 2019-04-19 2019-05-24 2023-06-30 vil Engineer ant Selection onal Strengthening DM-MAF-95860-CS-INDV / tr Restoration of Key Productiv Individual Consult aining for farmers and extens IDA / D3060 e Infrastructure and Instituti Post Open 100,000.00 0.00 Canceled 2019-03-12 2019-04-30 2019-05-21 2019-06-25 2019-12-22 ant Selection ion officers onal Strengthening DM-MAF-224389-CS-CDS / T Restoration of the Productiv echnical Assistance towards IDA / D3060 e Base for the Recovery of A Post Direct Selection Direct 20,000.00 20,000.00 Signed 2021-03-31 2021-03-31 2021-04-10 2021-04-08 2021-05-02 2021-07-13 2021-07-01 Building Resilient FRP Fishing gricultural Livelihoods Boats in Dominica DM-MAF-240907-CS-INDV / C Project Management and Co Individual Consult IDA / D3060 Post Open 40,370.37 28,782.29 Signed 2021-07-20 2021-07-20 2021-09-07 2022-05-24 2021-09-17 2022-05-31 2021-10-22 2022-06-01 2022-04-20 ommunication Officer ordination ant Selection DM-MAF-240911-CS-INDV / F Project Management and Co Individual Consult IDA / D3060 Post Open 12,129.63 0.00 Canceled 2021-07-20 2021-07-20 2021-09-07 2021-09-21 2021-10-26 2022-04-24 isheries Officer ordination ant Selection Restoration of Key Productiv DM-MAF-94789-CS-INDV / So Individual Consult IDA / D3060 e Infrastructure and Instituti Post Open 125,000.00 0.00 Canceled 2019-02-08 2020-02-10 2019-03-29 2019-04-19 2019-05-24 2023-06-30 cial Safeguards Officer ant Selection onal Strengthening DM-MAF-240913-CS-INDV / S Project Management and Co Individual Consult IDA / D3060 Post Open 125,000.00 0.00 Canceled 2021-07-30 2021-09-21 2021-09-17 2021-09-18 2021-10-23 2022-04-21 ocial Safeguards Officer ordination ant Selection Restoration of the Productiv DM-MAF-240922-CS-INDV / T Individual Consult IDA / D3060 e Base for the Recovery of A Post Direct 5,926.00 5,904.06 Signed 2021-06-29 2021-06-29 2021-07-09 2021-09-03 2021-07-10 2021-09-21 2021-07-27 2021-10-12 2021-10-15 echnical Assistant ant Selection gricultural Livelihoods DM-MAF-253893-CS-CDS / In Service Strengthening of Ext Restoration of Key Productiv ension Officers in Climate Re IDA / D3060 e Infrastructure and Instituti Post Direct Selection Direct 109,120.00 108,350.00 Signed 2021-10-08 2021-10-08 2021-10-18 2021-11-11 2021-12-22 2022-01-08 2022-06-20 silience Practices for Improve onal Strengthening d Agricultural Production DM-MAF-71721-C32-INDV / Project Management and Co Individual Consult IDA / D3060 Post Open 62,500.00 0.00 Canceled 2018-09-03 2018-10-22 2018-11-12 2018-12-17 2019-06-15 M&E IST ordination ant Selection Page 6 DM-MAF-269398-CS-INDV / A Project Management and Co Individual Consult griculture Information Techn IDA / D3060 Post Open 53,137.00 26,568.27 Signed 2022-01-28 2022-03-08 2022-03-18 2022-09-12 2022-04-08 2022-09-13 2022-04-23 2022-09-29 2022-10-20 ordination ant Selection ology Officer DM-MAF-281087-CS-INDV / S Project Management and Co Individual Consult IDA / D3060 Post Limited 125,000.00 0.00 Signed 2022-05-05 2022-05-03 2022-05-10 2022-05-09 2022-05-20 2022-06-17 2022-06-20 2023-02-15 ocial Safeguards Officer ordination ant Selection DM-MAF-240915-CS-INDV / Project Management and Co Individual Consult IDA / D3060 Post Open 84,629.63 0.00 Canceled 2021-07-30 2021-09-21 2021-09-17 2021-09-18 2021-10-23 2022-04-21 Monitoring & Evaluation Offic ordination ant Selection er DM-MAF-349739-CS-INDV / A Project Management and Co Individual Consult Under Implement IDA / D3060 Post Open - National 70,850.00 0.00 2023-03-31 2023-03-23 2023-05-19 2023-06-09 2023-07-14 2025-07-11 gribusiness Management Spe ordination ant Selection ation cialist DM-MAF-99403-CS-INDV / Inf Project Management and Co Individual Consult IDA / D3060 Post Limited 100,000.00 0.00 Canceled 2023-01-15 2023-01-20 2023-02-10 2023-03-17 2023-09-13 ormation System Developme ordination ant Selection nt DM-MAF-71685-CS-QCBS / S Restoration of the Productiv Individual Consult hort term technical adviser t IDA / D3060 e Base for the Recovery of A Post Open 140,000.00 0.00 Canceled 2019-02-22 2019-04-12 2019-05-03 2019-06-07 2019-12-04 ant Selection o support implementation gricultural Livelihoods DM-MAF-362184-CS-CDS / R Restoration of Key Productiv Pending Impleme evision of Fisheries Regulatio IDA / D3060 e Infrastructure and Instituti Post Direct Selection Direct - National 15,000.00 0.00 2023-06-30 2023-07-10 2023-08-24 2023-10-23 ntation n onal Strengthening DM-MAF-362187-CS-CDS / Fi Project Management and Co Direct - Internation Under Implement IDA / D3060 Post Direct Selection 18,000.00 0.00 2023-06-16 2023-06-15 2023-06-26 2023-07-30 2025-08-29 nancial audit 2022/2023 to 2 ordination al ation 024/2025 Page 7 PROCUREMENT PLAN (Textual Part) Project information: P167958 - COMMUNITY PARTICIPATION IN HOW IS MY SCHOOL DOING PROJECT Project Implementation agency: World Vision Dominicana Date of the Procurement Plan: 03-08-2022 Period covered by this Procurement Plan: during project implementation Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not applicable Works: Not applicable PROCUREMENT Dominican Republic : COMMUNITY PARTICIPATION IN HOW IS MY SCHOOL DOING PROJECT PLAN General Information Country: Dominican Republic 2022-03-31 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167958 GPN Date: 2022-04-26 Project Name: COMMUNITY PARTICIPATION IN HOW IS MY SCHOOL DOING PROJECT Loan / Credit No: TF / B0840 How is my School Doing Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-CVME-258014-GO-RFQ / Monitoring, Evaluation and L Request for Quota Single Stage - One E Adquisición de Softwares (Po TF / B0840 earning, and Project Manage Post Limited 150.00 0.00 Canceled 2022-04-19 2022-06-14 2023-01-18 tions nvelope wer BI, Zoom etc.) ment DO-CVME-258020-GO-RFQ / Monitoring, Evaluation and L Request for Quota Single Stage - One E TF / B0840 Post Open - National 4,500.00 5,207.89 Completed 2022-05-05 2022-07-23 2022-06-30 2022-07-22 2022-12-27 2022-07-27 Adquisición de 3 Laptop. earning, and Project Manage tions nvelope ment DO-CVME-257960-GO-RFQ / Community participation in s Request for Quota Single Stage - One E Adquisición de Accesorios de TF / B0840 chool management through Post Open - National 2,500.00 0.00 Canceled 2022-04-24 2022-06-19 2022-12-16 tions nvelope computadoras y cámara de v CVME ideos para TV DO-CVME-258017-GO-RFQ / Community participation in s Request for Quota Single Stage - One E Adquisición de paquetes de i TF / B0840 chool management through Post Open - National 2,500.00 0.00 Canceled 2022-05-19 2022-07-14 2023-01-10 tions nvelope nternet para 30 Escuelas (rec CVME arga de 2 GB). DO-CVME-258016-GO-RFQ / Community participation in s Request for Quota Single Stage - One E Adquisición de 10 televisores TF / B0840 chool management through Post Open - National 3,000.00 0.00 Canceled 2022-05-05 2022-06-30 2022-12-27 tions nvelope Smart 40 pulgadas. CVME DO-CVME-257998-GO-RFQ / Community participation in s Servicio de impresión de Mat Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 2,500.00 2,464.30 Completed 2022-03-30 2022-08-02 2022-05-25 2022-08-13 2022-11-21 2022-08-26 erial didáctico para capacitac tions nvelope CVME iones en 60 escuelas. DO-CVME-258018-GO-RFQ / Solicitud de compra de mater iales de higiene (50 Alcohol d Community participation in s Request for Quota Single Stage - One E e 1500 ml, 50 gel antibacteri TF / B0840 chool management through Post Open - National 3,500.00 0.00 Canceled 2023-04-06 2023-06-01 2023-11-28 tions nvelope al de 10 ml, 500 mascarillas CVME quirúrgicas) para el desarroll o de actividades en comunid ades. DO-CVME-258002-GO-RFQ / Establishing a follow-up mec Servicio de Impresión de Mat hanism between schools and Request for Quota Single Stage - One E TF / B0840 Post Open - National 1,800.00 900.73 Completed 2022-03-30 2022-05-25 2022-05-10 2022-11-21 2022-05-31 eriales de visibilidad Afiches, the Ministry of Education thr tions nvelope Banners y díptico. ough CVME DO-CVME-285846-GO-RFQ / Adquisición de materiales ga Monitoring, Evaluation and L Request for Quota Single Stage - One E stables varios (lapiceros, libr TF / B0840 earning, and Project Manage Post Open - National 700.00 115.67 Completed 2022-04-04 2022-07-20 2022-05-30 2022-05-17 2022-11-26 2022-05-17 tions nvelope etas, folders etc.) para realiz ment ación de talleres en comunid ad educativa. DO-CVME-258024-GO-RFQ / Monitoring, Evaluation and L Request for Quota Single Stage - One E Plataforma (servidores virtua TF / B0840 earning, and Project Manage Post Open - National 16,235.00 0.00 Canceled 2022-04-19 2022-06-14 2022-12-11 tions nvelope les en la nube) ment DO-CVME-285844-GO-RFQ / Adquisición de Artículos pro mocionales Souvenir para las Monitoring, Evaluation and L Request for Quota Single Stage - One E APMAES Para celebración de TF / B0840 earning, and Project Manage Post Open - National 1,200.00 0.00 Canceled 2022-03-30 2022-05-25 2022-11-21 tions nvelope Dia de las APMAE" Polo-Shirt ment para los colaboradores integr antes de la comunidad educa tiva del proyecto. DO-CVME-256484-GO-RFQ / Community participation in s Adquisición de 60 Murales inf Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 3,000.00 0.00 Canceled 2022-04-05 2022-05-31 2022-11-27 ormativos para Centros educ tions nvelope CVME ativos, en Vinil adhesivo 20X 24. DO-CVME-257733-GO-RFQ / Community participation in s Servicio de Diseño e impresió Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 500.00 0.00 Canceled 2022-04-20 2022-06-15 2022-06-18 n de 60 Impresiones de Scor tions nvelope CVME e Card en Escuelas. DO-CVME-360032-GO-RFQ / Adquisición de materiales ga stables varios (lapiceros, libr Community participation in s etas, folders etc.) para realiz Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 1,000.00 0.00 Completed 2023-05-05 2023-06-13 2023-06-20 ación de talleres en comunid tions nvelope CVME ad educativa y Adquisición d e 4 cajas plásticas para salva guardar las fuentes de verific ación del Proyecto. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-CVME-257943-NC-RFQ / Establishing a follow-up mec Diagramación y diseño de h hanism between schools and Request for Quota Single Stage - One E TF / B0840 Post Open - National 4,000.00 0.00 Canceled 2022-05-07 2022-07-02 2022-12-29 allazgo en la Evaluación de i the Ministry of Education thr tions nvelope mpacto del proyecto CVME. ough CVME Page 1 DO-CVME-257926-NC-RFQ / Diseño gráficos pedagógico d Community participation in s e los materiales de capacitac Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 2,200.00 0.00 Canceled 2022-10-20 2022-12-15 2023-06-13 ión (manuales, brochure, ban tions nvelope CVME ner ect.) Derivados de la gest ión y aprendizaje adaptivo de l proyecto. DO-CVME-258021-NC-RFQ / Community participation in s Request for Quota Single Stage - One E Servicio de producción de Vo TF / B0840 chool management through Post Open - National 2,000.00 0.00 Completed 2022-01-09 2022-07-28 2022-03-06 2022-09-02 2022-09-25 tions nvelope z en off para programa forma CVME tivo. DO-CVME-257954-GO-RFQ / Servicios de alimentos y rent Community participation in s Request for Quota Single Stage - One E a de espacio para realizar Co TF / B0840 chool management through Post Open - National 1,500.00 1,387.91 Completed 2022-04-27 2022-08-08 2022-06-22 2022-08-20 2022-12-19 2022-08-26 tions nvelope nmemoración del Día de la D CVME escentralización a nivel nacio nal, para 50 personas. DO-CVME-258000-GO-RFQ / Servicios de alimentos para r Monitoring, Evaluation and L ealizar "Foro Regional Ciudad Request for Quota Single Stage - One E TF / B0840 earning, and Project Manage Post Open - National 1,500.00 754.90 Completed 2022-04-06 2022-06-01 2022-04-30 2022-11-28 2022-05-07 anía Voz y Acción en Centros tions nvelope ment Educativos" en 28 Centros E ducativos de la zona Metropo litana, para 45 personas. DO-CVME-258028-GO-RFQ / Servicios de alimentos para r Community participation in s ealizar "Foro Regional Ciudad Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 1,200.00 1,043.92 Completed 2022-04-10 2022-07-20 2022-06-05 2022-04-29 2022-12-02 2022-04-29 anía Voz y Acción en Centros tions nvelope CVME Educativos" en 24 Centros Ed ucativos de la zona norte, pa ra 40 personas. DO-CVME-258350-NC-RFQ / Community participation in s Servicios de alimentos para r Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 500.00 767.42 Completed 2022-04-17 2022-07-22 2022-06-12 2022-05-21 2022-12-09 2022-05-24 ealizar Encuentro con Volunt tions nvelope CVME arios en la zona Metropolitan a, para 35 personas. DO-CVME-270877-NC-RFQ / Servicios de Alquiler de Trans porte privado con el recorrid Community participation in s Request for Quota Single Stage - One E o desde Santiago, La Vega y TF / B0840 chool management through Post Open - National 300.00 0.00 Canceled 2022-03-27 2022-05-22 2022-05-25 tions nvelope Bonao para participantes de CVME "Foro Regional Ciudadanía V oz y Acción en Centros Educa tivos" de la zona norte. DO-CVME-270850-NC-RFQ / Servicios de alimentos para r Community participation in s ealizar 5 talleres en 12 Centr Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 2,500.00 988.36 Completed 2022-04-19 2022-06-13 2022-06-14 2022-06-30 2023-01-18 2022-10-08 os Educativos en la Provincia tions nvelope CVME de Santiago para un total de 110 participantes por escuel a. DO-CVME-270875-NC-RFQ / Servicios de alimentos para r Community participation in s Request for Quota Single Stage - One E ealizar talleres Fase 2 CVA e TF / B0840 chool management through Post Open - National 35.54 0.00 Canceled 2022-04-06 2022-06-01 2022-11-28 tions nvelope n los 2 centros educativos en CVME Puerto Plata, zona norte. 5 p articipantes por escuelas. DO-CVME-270826-NC-RFQ / Servicios de alimentos para r Community participation in s Request for Quota Single Stage - One E ealizar 5 talleres en 4 Escuel TF / B0840 chool management through Post Open - National 800.00 250.87 Completed 2022-04-06 2022-06-13 2022-06-01 2022-06-21 2022-11-28 2022-06-21 tions nvelope as en la Villa Altagracia un to CVME tal de 65 participantes por es cuela. DO-CVME-270786-NC-RFQ / Servicios de alimentos para r Community participation in s Request for Quota Single Stage - One E ealizar 6 talleres en 4 Escuel TF / B0840 chool management through Post Open - National 800.00 476.32 Completed 2023-04-09 2022-06-13 2023-06-04 2022-06-30 2023-12-01 2022-10-08 tions nvelope a en Bonao un total de 110 p CVME articipantes por escuela. DO-CVME-270869-NC-RFQ / Servicios de alimentos para r Community participation in s Request for Quota Single Stage - One E ealizar 5 talleres en 2 Escuel TF / B0840 chool management through Post Open - National 350.00 448.97 Completed 2023-04-15 2022-06-13 2023-06-10 2022-06-27 2023-12-07 2022-10-09 tions nvelope a en La Provincia de Puerto P CVME lata un total de 110 participa ntes por escuela. DO-CVME-270852-NC-RFQ / Servicios de alimentos para r Community participation in s ealizar 5 talleres en 6 Centro Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 1,000.00 587.29 Completed 2023-04-15 2022-06-13 2023-06-10 2022-06-27 2023-12-07 2022-10-08 s Educativos en la Provincia tions nvelope CVME de La Vega para un total de 110 participantes por escuel a. DO-CVME-270805-NC-RFQ / Servicio de alimentos para re alizar Taller de formación con Community participation in s Request for Quota Single Stage - One E miembros de organismos de TF / B0840 chool management through Post Open - National 1,120.00 0.00 Completed 2022-04-06 2022-12-03 2022-06-01 2022-11-28 2022-12-10 tions nvelope participación escolar de 28 C CVME entros Educativos en el Gran Santo Domingo. 20 participa ntes por cada centro. DO-CVME-270881-NC-RFQ / Servicios de alimentos para r Community participation in s ealizar 4 talleres de la Fase 1 Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 3,400.00 0.00 Terminated 2022-04-19 2022-12-03 2022-06-14 2022-12-11 y 2 de CVA en los 28 centros tions nvelope CVME educativos en el Gran Santo Domingo. Un total de 90 part icipantes por escuela. DO-CVME-270837-NC-RFQ / Servicios de alimentos para r Community participation in s ealizar "Foro Regional Ciudad Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 700.00 0.00 Completed 2023-04-12 2022-10-26 2023-06-07 2023-12-04 2022-11-05 anía Voz y Acción en Centros tions nvelope CVME Educativos" en 8 Centros Edu cativos de San Cristóbal, par a 20 personas. DO-CVME-270863-NC-RFQ / Servicios de alimentos para r Community participation in s ealizar 5 talleres en 4 Centro Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 1,000.00 0.00 Completed 2022-04-06 2022-12-03 2022-06-01 2022-11-28 2022-11-30 s Educativos en la Provincia tions nvelope CVME de San Cristóbal para un tota l de 110 participantes por es cuela. DO-CVME-285916-NC-RFQ / Monitoring, Evaluation and L Servicio de Bordado de las C Request for Quota Single Stage - One E TF / B0840 earning, and Project Manage Post Open - National 80.00 0.00 Canceled 2021-03-25 2021-05-20 2021-11-16 amisas del Proyecto Mi Comu tions nvelope ment nidad Participa en CVME Page 2 DO-CVME-285910-NC-RFQ / Community participation in s Compra de Materiales Educat Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 70.00 0.00 Completed 2021-08-25 2021-10-20 2022-04-18 2021-09-05 ivos y gastables para utilizar tions nvelope CVME en encuentro con técnicos re gionales y distritales DO-CVME-285921-NC-RFQ / Servicio de alimentos y renta de local para celebrar la Jorn Community participation in s Request for Quota Single Stage - One E ada de capacitación del equi TF / B0840 chool management through Post Open - National 980.00 0.00 Completed 2021-08-07 2022-10-27 2021-10-02 2022-03-31 2022-11-14 tions nvelope po Vision Mundial, Técnicos R CVME egionales, Distritales y Direct ores de Centros Educativos Z ona Norte. DO-CVME-323688-NC-RFQ / Servicio de adquisición de m Community participation in s aterias educativos y gastable Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 1,500.00 0.00 Completed 2022-11-10 2022-11-25 2023-01-05 2023-07-04 2022-12-14 s para desarrollar encuentros tions nvelope CVME formativos con estudiantes, docentes y técnicos del MINE RD. DO-CVME-323689-NC-RFQ / Servicio de alimentos y renta de espacio para la celebració Establishing a follow-up mec n del Congreso Nacional de B hanism between schools and Request for Quota Single Stage - One E TF / B0840 Post Limited 6,000.00 0.00 Completed 2023-03-15 2023-03-01 2023-05-10 2023-11-06 2023-04-04 uenas Practicas de Participac the Ministry of Education thr tions nvelope ión Comunitaria en apoyo a l ough CVME a calidad educativa. Activida d de cierre del Proyecto. 100 personas. DO-CVME-323690-NC-RFQ / Monitoring, Evaluation and L Solicitud de materiales plega Request for Quota Single Stage - One E TF / B0840 earning, and Project Manage Post Open - National 2,500.00 0.00 Completed 2022-11-10 2022-12-09 2023-01-05 2023-07-04 2023-01-28 bles y portátiles para la impl tions nvelope ment ementación del Proyecto en campo. DO-CVME-323700-NC-RFQ / Servicio de alimentos para r Community participation in s Request for Quota Single Stage - One E ealizar jornada formativa con TF / B0840 chool management through Post Open - National 700.00 0.00 Completed 2022-11-10 2022-11-03 2023-01-05 2023-07-04 2022-11-16 tions nvelope Técnicos del MINERD en Sant CVME o Domingo Para 20 personas. Regional 10 DO-CVME-323692-NC-RFQ / Monitoring, Evaluation and L Servicio de impresión de mat Request for Quota Single Stage - One E TF / B0840 earning, and Project Manage Post Open - National 9,850.00 0.00 Completed 2022-11-10 2023-03-21 2023-01-05 2023-07-04 eriales formativos y de visibil tions nvelope ment idad del Proyecto DO-CVME-323691-NC-RFQ / Servicio de alimentos para 2 0 personas, actividad para d Community participation in s Request for Quota Single Stage - One E esarrollar Encuentro de revisi TF / B0840 chool management through Post Open - National 1,200.00 0.00 Completed 2022-11-25 2022-11-25 2023-01-20 2023-07-19 2022-12-10 tions nvelope ón del Protocolo de acción p CVME ara el seguimiento a los orga nismos de Participación Escol ar con Técnicos del MINERD. DO-CVME-323694-NC-RFQ / Community participation in s Servicio de diseño y diagram Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 4,300.00 0.00 Canceled 2022-11-25 2023-01-20 2023-07-19 ación de materiales formativ tions nvelope CVME os y de visibilidad del Proyec to DO-CVME-270878-NC-RFQ / Servicios de streaming para Establishing a follow-up mec Zoom y YouTube, Para celebr hanism between schools and Request for Quota Single Stage - One E TF / B0840 Post Open - National 5,000.00 0.00 Canceled 2023-01-06 2023-03-03 2023-08-30 ar el Congreso Nacional de B the Ministry of Education thr tions nvelope uenas Prácticas de Participac ough CVME ión Comunitaria en apoyo a l a calidad educativa. DO-CVME-258004-NC-RFQ / Servicio de alimentos para d Establishing a follow-up mec ar el Entrenamientos colabor hanism between schools and Request for Quota Single Stage - One E TF / B0840 Post Open - National 300.00 0.00 Canceled 2022-05-21 2022-11-07 2022-07-16 2023-01-12 ativos con IDEC y Comité de the Ministry of Education thr tions nvelope Veeduría para establecer vín ough CVME culos entre CVME, Plan Estrat égico y Pacto Educativo . DO-CVME-257730-GO-RFQ / Servicio de alimentos y renta Establishing a follow-up mec de espacio, Congreso Nacion hanism between schools and Request for Quota Single Stage - One E al de Buenas Practicas de Par TF / B0840 Post Open - National 1,500.00 0.00 Completed 2022-11-16 2022-11-04 2023-01-11 2023-07-10 2022-11-30 the Ministry of Education thr tions nvelope ticipación Comunitaria en ap ough CVME oyo a la calidad educativa, e n conmeración del mes de la familia. DO-CVME-285918-NC-RFQ / Monitoring, Evaluation and L Servicio de diseño e impresió Request for Quota Single Stage - One E TF / B0840 earning, and Project Manage Post Open - National 388.00 0.00 Completed 2020-07-11 2020-09-05 2021-03-04 2021-07-18 n 3 Banner tamano 31x80 PU tions nvelope ment LGS. Impresos a full color DO-CVME-285913-NC-RFQ / Establishing a follow-up mec Servicio de impresión de 50 c hanism between schools and Request for Quota Single Stage - One E opias a full color en papel Bo TF / B0840 Post Open - National 645.00 0.00 Completed 2021-05-01 2021-06-26 2021-12-23 2021-05-07 the Ministry of Education thr tions nvelope nd tamano 8/30 x11y encuar ough CVME denacion espiral a manual de encuestadores DO-CVME-257734-NC-RFQ / I Community participation in s Request for Quota Single Stage - One E mplementación de Plataform TF / B0840 chool management through Post Open - National 10,000.00 0.00 Canceled 2022-03-30 2022-07-29 2022-05-25 2022-11-21 tions nvelope a, creación de aula virtual de CVME estudio. DO-CVME-324459-NC-RFQ / I Community participation in s Request for Quota Single Stage - One E mplementación de Plataform TF / B0840 chool management through Post Open - National 20,000.00 0.00 Signed 2022-11-10 2022-12-08 2023-01-05 2023-07-04 tions nvelope a, creación de aula virtual de CVME estudio. DO-CVME-258015-NC-RFQ / Establishing a follow-up mec Servicios de fotografia y vide hanism between schools and Request for Quota Single Stage - One E os para el Congreso Nacional TF / B0840 Post Open - National 715.00 0.00 Canceled 2022-03-30 2022-05-25 2022-11-21 the Ministry of Education thr tions nvelope de Buenas Practicas de Partic ough CVME ipación Comunitaria en apoy o a la calidad educativa. DO-CVME-285928-NC-RFQ / Community participation in s Servicio de alimentación par Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 208.00 0.00 Completed 2021-05-19 2021-07-14 2022-01-10 2021-05-31 a realizar jornadas en centro tions nvelope CVME s educativos zona metropolit ana DO-CVME-285920-NC-RFQ / Community participation in s Servicio de alimentación par Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 87.00 0.00 Canceled 2021-05-19 2021-07-14 2022-01-10 a realizar jornadas en centro tions nvelope CVME s educativos zona metropolit ana (Galleta) Page 3 DO-CVME-270866-NC-RFQ / Compra y servicio de bordad Monitoring, Evaluation and L Request for Quota Single Stage - One E o de camisas tipo Columbia, TF / B0840 earning, and Project Manage Post Open - National 2,000.00 0.00 Canceled 2022-04-04 2022-05-30 2022-11-26 tions nvelope mangas largas de colores ne ment gro, blanca y azul, con Logo del proyecto. DO-CVME-323697-NC-RFQ / Servicio de alimentos para r Community participation in s Request for Quota Single Stage - One E ealizar jornada formativa con TF / B0840 chool management through Post Open - National 700.00 0.00 Completed 2022-11-10 2022-12-03 2023-01-05 2023-07-04 2022-11-21 tions nvelope Tecnicos del MINERD en San CVME to Domingo Para 20 personas . Regional 15 DO-CVME-351268-NC-RFQ / Servicio de alimentos para so Establishing a follow-up mec cializar la sistematización de hanism between schools and Request for Quota Single Stage - One E TF / B0840 Post Open - National 700.00 0.00 Completed 2023-04-26 2023-06-30 2023-12-27 buenas prácticas en auditori the Ministry of Education thr tions nvelope a Social en centros educativo ough CVME s del Corredor Duarte. 20 per sonas. DO-CVME-352076-NC-RFQ / I mpresión del INFOGRAFICO 1 7x22 Cartonite 1 Cara. 100 ej Establishing a follow-up mec emplares. Impresión de las S hanism between schools and Request for Quota Single Stage - One E TF / B0840 Post Open - National 3,900.00 0.00 Canceled 2023-03-29 2023-05-24 2023-11-20 core Card de las 60 escuelas the Ministry of Education thr tions nvelope objetivos del Proyecto. A tod ough CVME o color 17X22. Impresión de 60 Murales de visibilidad de l as APMAE para 60 centros ed ucativos. DO-CVME-357699-NC-RFQ / Solicitud de refrigerio para re Community participation in s alizar Jornada formativo en t Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 1,000.00 0.00 Completed 2023-05-12 2023-05-10 2023-06-06 2023-06-20 2023-05-14 orno a la metodología Ciudan tions nvelope CVME ía, Voz y Acción con la comu nidad educativa de la escuel a Juan Pablo Pina, San Cristó bal. DO-CVME-359988-NC-RFQ / Encuentro de cierre del Proy ecto en la Zona Norte: Servic Community participation in s io de alimentos y renta de es Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 10,000.00 0.00 Completed 2023-05-12 2023-06-13 2023-06-18 pacio para la celebración del tions nvelope CVME cierre del proyecto y las entr egas de las Scoredcard (28x4 ) actividad para un estimado de 112 personas DO-CVME-359989-NC-RFQ / Encuentro de Cierre del Proy ecto en la Zona Metropolitan Community participation in s a: Servicio de alimentos y re Request for Quota Single Stage - One E TF / B0840 chool management through Post Open - National 15,000.00 0.00 Canceled 2023-05-12 2023-06-14 2023-06-19 nta de espacio para la celebr tions nvelope CVME ación del Cierre del Proyecto y las entregas de las Scoredc ard para un estimado de 14 0 personas DO-CVME-360025-GO-RFQ / Community participation in s Request for Quota Single Stage - One E TF / B0840 Post Open - National 10,000.00 0.00 Completed 2023-05-10 2023-06-10 2023-06-20 2023-06-20 Adquisición de Materiales ser chool management through tions nvelope igrafiados CVME DO-CVME-360015-NC-RFQ / I mpresión de Herramientas fo rmativas diseñadas o replica Establishing a follow-up mec das en el Marco del Proyecto hanism between schools and Request for Quota Single Stage - One E Under Imple Mi Comunidad Participa en C TF / B0840 Post Open - National 21,390.00 0.00 2023-05-05 2023-05-26 2023-06-20 the Ministry of Education thr tions nvelope mentation omo Va Mi Escuela e impresi ough CVME ón del Informe de la evaluaci ón del Proyecto, realizado en el formato del GPSA y murale s de visibilidad DO-CVME-364457-NC-RFQ / Establishing a follow-up mec Diseño, ilustración y diagram hanism between schools and Request for Quota Single Stage - One E Under Imple TF / B0840 Post Open - National 15,600.00 0.00 2023-06-04 2023-07-30 2024-01-26 ación de los materiales form the Ministry of Education thr tions nvelope mentation ativos y de visibilidad del pro ough CVME yecto. DO-CVME-365429-NC-RFQ / Solicitud de refrigerio para re alizar Encuentros del Cierre d Community participation in s Request for Quota Single Stage - One E Under Imple el Proyecto en Los 60 centros TF / B0840 chool management through Post Open - National 20,000.00 0.00 2023-06-06 2023-06-12 2023-06-12 tions nvelope mentation Educativos: CVME “Ciudadanía Voy y Acción For taleciendo la Participación Es colar y Comunitaria CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-CVME-258023-CS-CQS / Monitoring, Evaluation and L Consultant Qualifi TF / B0840 Post Open - National 9,000.00 0.00 Canceled 2023-04-03 2023-04-24 2023-06-07 2023-07-07 2023-08-11 2024-02-07 Auditoria Externa del proyect earning, and Project Manage cation Selection o. ment DO-CVME-285875-NC-RFQ / Establishing a follow-up mec Servicio de consultoría para l hanism between schools and Quality Based Sel Under Implement TF / B0840 Post Open - National 41,300.00 0.00 2021-04-19 2021-04-19 2021-05-10 2021-06-23 2021-04-14 2021-07-21 2021-04-14 2021-08-20 2021-09-19 2021-10-24 2022-10-24 evantamiento de Encuesta e the Ministry of Education thr ection ation n 180 centros educativos ough CVME DO-CVME-285906-CS-QBS / Monitoring, Evaluation and L Contratación de Firma De Au Quality Based Sel TF / B0840 earning, and Project Manage Post Open - National 5,610.00 0.00 Completed 2021-09-21 2021-05-17 2021-10-12 2021-11-25 2021-05-15 2021-12-23 2021-05-17 2022-01-22 2021-05-17 2022-02-21 2021-05-17 2022-03-28 2023-03-28 2022-07-29 ditores Para Visión Mundial In ection ment ternacional y Banco Mundial INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DO-CVME-257737-NC-RFQ / 2 Facilitadores para Jornada Community participation in s Individual Consult s formativas CVA Miembros d TF / B0840 chool management through Post Open 12,000.00 998.19 Completed 2022-04-01 2022-04-19 2022-05-20 2022-04-26 2022-06-10 2022-04-27 2022-07-15 2022-04-28 2023-01-11 2022-05-08 ant Selection e APMAEs, Técnicos Regional CVME es, Distritales y Directores de Centros Educativos. Page 4 DO-CVME-258398-CS-INDV / Monitoring, Evaluation and L Contratación de servicios de Individual Consult TF / B0840 earning, and Project Manage Post Open 50,342.47 0.00 Completed 2020-02-28 2020-01-20 2020-04-17 2020-02-18 2020-05-08 2020-03-24 2020-06-12 2020-12-09 2023-05-17 Consultoria para la eleboraci ant Selection ment ón de las Evaluaciones inter media y Final. DO-CVME-285869-CS-INDV / Community participation in s Servicio de consultoria para Individual Consult Under Implement TF / B0840 chool management through Post Open 5,478.00 0.00 2021-08-20 2021-04-12 2021-10-08 2021-10-29 2021-12-03 2022-06-01 el Desarrollo de capacitacion ant Selection ation CVME es en centros educativos DO-CVME-314908-CS-INDV / Servicio de consultoría indivi Community participation in s dual para facilitar fase 2 de l Individual Consult TF / B0840 chool management through Post Open - National 2,000.00 0.00 Canceled 2022-09-24 2022-10-26 2022-11-12 2022-12-03 2023-01-07 2023-07-06 a metodología ciudadanía, vo ant Selection CVME z y acción (CVA) a trabajar e n la zona norte de Santo Do mingo Este y Distrito Naciona l. DO-CVME-314910-CS-INDV / Desarrollar la fase 2 de CVA en 12 escuelas intervenidas Community participation in s Individual Consult por el Proyecto Mi Comunida TF / B0840 chool management through Post Open - National 3,000.00 0.00 Canceled 2022-09-24 2022-10-26 2022-11-12 2022-12-03 2023-01-07 2023-07-06 ant Selection d Participa en Como Va Mi Es CVME cuela, ubicadas en San Cristó bal, Villa Altagracia y Santo Domingo Oeste. DO-CVME-314911-CS-INDV / Desarrollar la fase 2 de CVA Community participation in s en 14 escuelas intervenidas Individual Consult TF / B0840 chool management through Post Open - National 3,500.00 0.00 Canceled 2022-09-24 2022-10-24 2022-11-12 2022-12-03 2023-01-07 2023-07-06 por el Proyecto Mi Comunida ant Selection CVME d Participa en Como Va Mi Es cuela, ubicadas en Bonao, La Vega, Santiago y Puerto Plat a DO-CVME-258019-CS-INDV / Establishing a follow-up mec Servicios de consultoría siste hanism between schools and Individual Consult TF / B0840 Post Open 15,000.00 0.00 Canceled 2022-07-01 2022-08-19 2022-09-09 2022-10-14 2023-04-12 matización de buenas practic the Ministry of Education thr ant Selection as en auditoria Social en cent ough CVME ros educativos. DO-CVME-357232-CS-CDS / Monitoring, Evaluation and L Under Implement TF / B0840 Post Direct Selection Direct - National 9,000.00 0.00 2023-04-21 2023-05-15 2023-05-01 2023-05-15 2023-07-05 2024-01-01 Auditoria externa del proyect earning, and Project Manage ation o ment DO-CVME-359985-CS-INDV / Servicio de consultoria para l a sistematizacion del proyect Establishing a follow-up mec o Mi Comunidad Participa en hanism between schools and Individual Consult Under Implement Como Va Mi Escuela (Buenas TF / B0840 Post Open - National 18,000.00 0.00 2023-05-05 2023-05-22 2023-05-25 2023-05-30 2023-06-13 2023-06-24 the Ministry of Education thr ant Selection ation Practicas) y Sistematizacion ough CVME y digitalizacion de datos cuali tativos y cuantitativos de 60 centros educativos ubicados en el corredor Duarte DO-CVME-360012-CS-INDV / Diseño de Murales de visibili dad de los Organismos de Pa Establishing a follow-up mec rticipación Escolar (Identifica hanism between schools and Individual Consult TF / B0840 Post Open - National 4,500.00 0.00 Canceled 2023-05-05 2023-06-20 2023-06-28 2023-07-07 2023-07-18 ndo los Roles y las funciones the Ministry of Education thr ant Selection de Cada uno) y Diagramació ough CVME n del Informe de la evaluació n del Proyecto, realizado en el formato del GPSA. DO-CVME-361876-CS-INDV / Servicio de Diseño, ilustració n y diagramación de las de S Establishing a follow-up mec core Card de las evaluacione hanism between schools and Individual Consult s de los estandares educativ TF / B0840 Post Open - National 7,000.00 0.00 Under Review 2023-05-16 2023-05-30 2023-05-23 2023-05-26 2023-05-31 2023-05-31 the Ministry of Education thr ant Selection os realizados durante la impl ough CVME ementacion del proyecto Mi Comunidad Participa en Com o Va Mi Escuela 60 escuelas. Full color 17X22. DO-CVME-362554-CS-INDV / PARA EL DISEÑO, ILUSTRACI Establishing a follow-up mec ÓN Y DIAGRAMACIÓN DE LOS hanism between schools and Individual Consult TF / B0840 Post Open - National 8,600.00 0.00 Canceled 2023-05-19 2023-05-29 2023-05-31 2023-06-09 2023-06-13 MATERIALES FORMATIVOS Y the Ministry of Education thr ant Selection DE VISIBILIDAD DEL PROYEC ough CVME TO MI COMUNIDAD PARTICIP A EN COMO VA MI ESCUELA Page 5 Procurement Arrangements Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: National competition for the procurement of goods, works and non- consulting services according to the established thresholds will be conducted in accordance with paragraphs 5.3 – 5.6 of Section V of the Regulations and the following provisions: i. Only the model bidding documents for National Competitive Procurement (NCP) agreed with the Wold Bank (and as amended for time to time), shall be used for bidding. ii. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. iii. No special preference will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises or enterprises from any given State. iv. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. v. Government e-Marketplace (GeM)* set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations (RFQ) method. vi. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system. vii. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. viii. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. ix. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. x. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety risks and impacts. *Use of GeM will be allowed in lieu of RFQ/Shopping as per following details: i. up to INR 50,000 in catalog mode (viz. any available item could be selected by IA without further competition), provided selected Item/Supplier meeting the requisite quality, specification and delivery period. ii. up to INR 3 Million from the Supplier having lowest price amongst at least three Suppliers meeting the requisite quality, specification and delivery period. The tools for online bidding and online reverse auction available on GeM may be used by the Purchaser. iii. up to INR equivalent of US$ 100,000 from the Supplier having lowest price and meeting the requisite quality, specification and delivery period after mandatorily obtaining bids from at least three Suppliers, using online bidding or reverse auction tool provided on GeM. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets: Not Applicable Procurement of Second Hand Goods: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations. Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable The table below describes various procurement methods to be used for activities financed by the loan. The thresholds (Table 11) indicated in apply to the initial 18-months of implementation period and are based on the procurement performance of the project: Table 1: Procurement Thresholds Procurement Approaches and Methods Thresholds (US$ equivalent) Open international (Works) > 40 million Open national (Works) > 100,000 and up to 40 million Open international (goods, IT system, and non- > 10 million consulting services) Open national (goods, IT system, and non- > 100,000 and up to 10 million consulting services) National request for quotation (goods, IT system, Up to 100,000 works & non-consulting services) Direct selection No threshold; For Works; Goods/non-consulting services/IT system: According to paragraphs 6.8–6.10 of the Regulations; For consultants: According to paragraphs 7.13–7.15 of the Regulations Procurement Approaches and Methods Thresholds (US$ equivalent) Consultancy services (national): Shortlist with only Up to 800,000 national consultants Consultancy services (International) > 800,000 Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost up to US$_800,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of Procurement Regulations. Procurement prior-review thresholds. The World Bank will prior review the procurement process based on the following thresholds table and as agreed in the approved procurement plan: Irrespective of the thresholds, ToRs shall be prior reviewed by Bank. The prior review thresholds will also be indicated in the Procurement Plan. The Procurement Plan will be subsequently updated annually (or at any other time if required) and will reflect any change in the prior review thresholds. The details of National Procurement Procedures will be outlined in the Procurement Plan. Prior review contract. In the case of contracts subject to prior review, the Implementing Agencies will seek the World Bank’s no objection before granting/agreeing to: (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of Works, goods, IT system; non-consulting services, or consulting services and other significant changes to the terms and conditions of the contract; (c) any variation order or amendment (except in cases of extreme urgency) that, singly or combined with all variation orders or amendments previously issued, increases the original contract amount by more than 15 percent; and (d) the proposed termination of the contract. Complaints received in all prior review cases shall be sent to Bank for review and the response to the complaint in such cases, shall be cleared with the Bank. Complaints with allegations of fraud and corruption, shall be shared with Bank, irrespective of the thresholds. Disclosure of procurement information. The following documents shall be disclosed on the project/state websites: (a) Procurement Plan and its updates; (b) an invitation for bids for procurement of Works, Goods, IT system procurement and non-consulting services; (c) request for expression of interest for selection/hiring of consulting services; (d) contract awards of Works, Goods, IT system procurement and non-consulting services procured following international and national procedures; (e) a list of contracts/purchase orders placed following RFQ (Request for Quotation) procedures on a quarterly basis; (f) a list of contracts following direct contracting (DC) on a quarterly basis; (g) an annual financial and physical progress report of all contracts; and (h) an action taken report on the complaints received on a quarterly basis. The following details shall be sent to the World Bank for publishing on the United Nations Development Business and the World Bank external website: (a) Specific Procurement Notice (i.e. invitation for bids) for procurement of Works, Goods , IT system procurement and non-consulting services using open international procedures; (b) Requests for Expression of Interests above USD 800,000; (c) contract award details of all procurement of Works, Goods, IT system procurement and non-consulting services using open international procedure; and(d) a list of contracts/purchase orders placed following DC procedures on a quarterly basis. Further, the implementing agency will also publish on their websites any information required under the provisions of ‘suo moto’ disclosure as specified by the Right to Information Act. Other Relevant Procurement Information. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. To avoid doubts, the Bank may conduct, at any time, Independent Procurement Reviews of all the contracts financed under the loan. Even for Post Review cases, the inputs of Bank on Technical Specifications / TORs will be obtained by project. PROCUREMENT India : Assam Integrated River Basin Management Program PLAN General Information Country: India 2022-06-02 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174593 GPN Date: 2022-01-25 Project Name: Assam Integrated River Basin Management Program Loan / Credit No: / , IBRD / 94870 Assam Disaster Risk Management Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-ASDMA-299469-GO-RFQ / Component 3: Disaster Risk Request for Quota Single Stage - One E / Post Open - National 11,002.37 4,697.09 Completed 2022-07-01 2022-08-06 2022-06-19 2022-10-05 2022-09-20 Office IT-Goods for ASDMA-AI Management tions nvelope RBMP. IN-ASDMA-304820-GO-RFQ / Component 3: Disaster Risk Request for Quota Single Stage - One E / Post Open - National 1,950.00 1,531.73 Completed 2022-07-22 2022-07-21 2022-08-06 2022-09-26 2022-11-04 2022-11-14 Basic Video Conferencing Ca Management tions nvelope mera IN-ASDMA-GOODS3-RFB / Su pply, Installation and commis Component 3: Disaster Risk Single Stage - Two E Pending Impl IBRD / 94870 Post Request for Bids Open - National 514,489.00 0.00 2023-05-28 2023-06-05 2023-07-25 2023-10-13 2023-11-17 2024-01-16 sion of emergency equipmen Management nvelope ementation t for CQRT members NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-ASDMA-312161-CS-QCBS / Design, Management & Sup Component 3: Disaster Risk Quality And Cost- Under Implement / Prior Open - National 1,187,950.00 0.00 2022-09-05 2022-09-01 2022-09-25 2022-10-11 2022-11-14 2023-02-17 2022-12-14 2023-04-27 2022-12-24 2023-01-10 2023-02-03 2027-02-02 ervision Consultancy for Floo Management Based Selection ation d Shelter and allied. IN-ASDMA-362746-CS-QCBS Component 3: Disaster Risk Quality And Cost- Under Implement / Socio-Technical Agency for IBRD / 94870 Post Open - National 1,400,000.00 0.00 2023-05-23 2023-06-12 2023-06-16 2023-08-31 2023-10-16 2023-11-30 2024-01-15 2024-02-29 2026-11-30 Management Based Selection ation Climate Resilient Villages INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-ASDMA-297718-CS-INDV / DRM expert is expected to pr ovide inputs in ensuring inve stment Readiness for the EW Component 1: Institutional S Individual Consult DS component. This shall incl / trengthening and Strategic S Post Direct 7,726.78 7,567.38 Signed 2022-06-05 2022-06-16 2022-06-15 2022-06-18 2022-06-20 2022-06-28 2022-07-10 2022-07-01 2022-11-07 ant Selection ude but not limited to - Prepa tudies ration Cost Estimates, identifi cation of activities under the component, assistances in pa ckaging of activities. IN-ASDMA-300401-CS-INDV / Component 3: Disaster Risk Individual Consult Under Implement Community Based Disaster R IBRD / 94870 Post Open 18,701.30 0.00 2022-06-28 2022-07-25 2022-07-23 2022-10-27 2022-07-30 2022-08-14 2023-08-14 Management ant Selection ation isk Management (CBDRM) Ex pert IN-ASDMA-297719-CS-INDV / Individual Consultant-Structu ral Design Specialist (Flood S helter) is expected to provide Component 1: Institutional S Individual Consult inputs for the Flood Shelter c / trengthening and Strategic S Post Open 13,921.62 0.00 Canceled 2022-06-03 2022-06-16 2022-06-30 2022-07-07 2022-07-21 2023-07-21 ant Selection omponent which shall includ tudies e Estimation and costing assi stances, Technical Design as sistances for investment/proc urement readiness. IN-ASDMA-304818-CS-INDV / Component 3: Disaster Risk Individual Consult Flood Shelter Technical Lead / Post Open - National 14,025.97 0.00 Canceled 2022-07-22 2022-07-20 2022-08-14 2022-08-21 2022-09-06 2023-09-06 Management ant Selection (Individual Consultant) IN-ASDMA-304818-CS-INDV- Component 3: Disaster Risk Individual Consult Under Implement IBRD / 94870 Post Open - National 15,000.00 0.00 2022-09-20 2022-09-20 2022-10-24 2022-11-30 2022-10-31 2022-11-30 2022-11-18 2023-11-18 2 / Flood Shelter Technical Le Management ant Selection ation ad IN-ASDMA-333346-CS-CDS / Component 3: Disaster Risk Under Implement Engagement of Assam Engin / Post Direct Selection Direct - National 13,013.00 0.00 2022-12-30 2023-02-02 2023-01-11 2022-08-24 2023-02-10 2023-05-21 Management ation eering College for DPR vet. IN-ASDMA-359343-CS-INDV / Component 3: Disaster Risk Individual Consult Under Implement Hiring of Procurement Officer IBRD / 94870 Post Open - National 16,150.00 0.00 2023-05-08 2023-05-06 2023-07-03 2023-07-18 2023-08-24 2024-08-23 Management ant Selection ation for ASDMA under AIRBMP IN-ASDMA-362000-CS-INDV / Component 3: Disaster Risk Individual Consult Under Implement Hiring of an Accountant unde IBRD / 94870 Post Open - National 5,100.00 0.00 2023-05-26 2023-05-23 2023-07-29 2023-08-28 2023-09-26 2024-09-25 Management ant Selection ation r AIRBMP-PIU-ASDMA Page 1 PROCUREMENT PLAN (Textual Part) Project information: Timor-Leste: COVID-19 AND HEALTH SYSTEMS STRENGTHENING SUPPORT PROJECT – P175401 Project Implementation agency: CARE International, Timor-Leste Date of the Procurement Plan: [August 15, 2022 ] Period covered by this Procurement Plan: [1 August 2022 – 31 December 2022] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the implementing agency CARE International, Timor-Leste procurement procedures may be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Secondhand Goods as specified under paragraph 5.11 of the Procurement Regulations – is Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: [is not applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. PROCUREMENT Timor-Leste : Timor-Leste COVID-19 and Health Systems Strengthening Support Project PLAN General Information Country: Timor-Leste 2022-08-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175401 GPN Date: Project Name: Timor-Leste COVID-19 and Health Systems Strengthening Support Project Loan / Credit No: TF / B8879 CARE International Timor-Leste Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1. Building capa city for preparedness and re Request for Quota Single Stage - One E TL-HSSSP/GO01 / Motorbike TF / B8879 Post Open - National 43,500.00 0.00 Signed 2022-08-27 2022-10-22 2023-04-20 sponse to COVID-19 and oth tions nvelope er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/GO03 / Tablet (tea city for preparedness and re Request for Quota Single Stage - One E TF / B8879 Post Open - National 10,500.00 0.00 Signed 2022-09-06 2022-11-01 2023-04-30 ms) sponse to COVID-19 and oth tions nvelope er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/GO04 / Printer and city for preparedness and re Request for Quota Single Stage - One E Under Imple TF / B8879 Post Open - National 6,000.00 0.00 2022-08-27 2022-10-22 2023-04-20 projector sponse to COVID-19 and oth tions nvelope mentation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/GO05 / Office Furn city for preparedness and re Request for Quota Single Stage - One E TF / B8879 Post Open - National 8,000.00 0.00 Signed 2022-08-27 2022-10-22 2023-04-20 iture & Equipment sponse to COVID-19 and oth tions nvelope er health emergencies at th e community lev el Component 2. Improving co TL-HSSSP/GO09 / Personal Pr mmunity awareness, knowle Request for Quota Single Stage - One E Pending Impl otective Equipment (PPE), st TF / B8879 Post Open - National 54,000.00 0.00 2022-08-27 2022-10-22 2023-04-20 dge, attitudes, and behaviou tions nvelope ementation orage containers r to COVID-19 and other heal th emergencies Component 1. Building capa TL-HSSSP/GO10 / Facility Ma city for preparedness and re Request for Quota Single Stage - One E Pending Impl nagement Group (FMG) main TF / B8879 Post Open - National 55,890.00 0.00 2022-08-27 2022-10-22 2023-04-20 sponse to COVID-19 and oth tions nvelope ementation tenance Equipment er health emergencies at th e community lev el TL-HSSSP/GO11 / Maintenan Component 1. Building capa ce tool kit to be procured for city for preparedness and re Request for Quota Single Stage - One E Pending Impl TF / B8879 Post Open - National 9,000.00 0.00 2022-08-27 2022-10-22 2023-04-20 Facility Management Group ( sponse to COVID-19 and oth tions nvelope ementation FMG) er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/GO12 / Portable w city for preparedness and re Request for Quota Single Stage - One E Pending Impl TF / B8879 Post Open - National 4,320.00 0.00 2022-08-27 2022-10-22 2023-04-20 ater testing kits sponse to COVID-19 and oth tions nvelope ementation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/GO13 / Behaviour city for preparedness and re Request for Quota Single Stage - One E Pending Impl Changes Communication (BC TF / B8879 Post Open - National 15,000.00 0.00 2022-09-06 2022-11-01 2023-04-30 sponse to COVID-19 and oth tions nvelope ementation C) video messaging er health emergencies at th e community lev el TL-HSSSP/GO15 / Printing an Component 1. Building capa d design of training materials city for preparedness and re Request for Quota Single Stage - One E Pending Impl TF / B8879 Post Open - National 6,800.00 0.00 2022-10-06 2022-12-01 2023-05-30 for nutrition, disaster ready r sponse to COVID-19 and oth tions nvelope ementation eduction (DRR), gender post er health emergencies at th er chart. Flip charts e community lev el Component 2. Improving co TL-HSSSP/GO16 / Kitchen ga mmunity awareness, knowle Request for Quota Single Stage - One E Pending Impl rdens (at aldeai level) equip TF / B8879 Post Open - National 90,000.00 0.00 2022-11-12 2023-01-07 2023-07-06 dge, attitudes, and behaviou tions nvelope ementation ment, seeds r to COVID-19 and other heal th emergencies Component 1. Building capa city for preparedness and re Request for Quota Single Stage - One E Under Imple TL-HSSSP/GO02 / Laptop TF / B8879 Post Open - National 13,000.00 0.00 2022-09-04 2022-10-30 2023-04-28 sponse to COVID-19 and oth tions nvelope mentation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/GO08 / Visibility (T city for preparedness and re Request for Quota Single Stage - One E Pending Impl shirts, Flyers) and media cov TF / B8879 Post Open - National 9,000.00 0.00 2022-11-19 2023-01-14 2023-07-13 sponse to COVID-19 and oth tions nvelope ementation erage. er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/GO06 / Generator city for preparedness and re Request for Quota Single Stage - One E Under Imple for Covalima and Viqueque F TF / B8879 Post Open - National 2,000.00 0.00 2022-09-06 2022-11-01 2023-04-30 sponse to COVID-19 and oth tions nvelope mentation ield Office er health emergencies at th e community lev el NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 Component 3. Project Manag TL-HSSSSP/CO-FIRM01 / Audi ement and Administration, Consultant Qualifi Open - Internationa Pending Impleme TF / B8879 Post 72,000.00 0.00 2023-08-01 2023-08-22 2023-10-05 2023-11-04 2023-12-09 2024-06-06 t Monitoring and Evaluation, a cation Selection l ntation nd Knowledge Dissemination Component 1. Building capa TL-HSSSP/NC02 / Support co city for preparedness and re Consultant Qualifi TF / B8879 Post Open - National 68,000.00 0.00 Canceled 2023-08-22 2023-09-12 2023-10-26 2023-11-25 2023-12-30 2024-06-27 st for the WASH partners-02. sponse to COVID-19 and oth cation Selection er health emergencies at th e community lev el INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1. Building capa TL-HSSP/CO-INDV06 / Field city for preparedness and re Individual Consult Under Implement Wash specialist lead across c TF / B8879 Post Open - National 19,868.00 0.00 2023-02-01 2023-03-09 2023-03-22 2023-03-22 2023-04-12 2023-05-17 2023-11-13 sponse to COVID-19 and oth ant Selection ation omponent 1 & 2 (National) er health emergencies at th e community lev el Component 1. Building capa TL-HSSP/CO-INDV11 / Field city for preparedness and re Individual Consult Pending Impleme Wash specialist lead across c TF / B8879 Post Open - National 19,868.00 0.00 2023-02-01 2023-03-22 2023-04-12 2023-05-17 2023-11-13 sponse to COVID-19 and oth ant Selection ntation omponent 1 & 2 (National) er health emergencies at th e community lev el Component 1. Building capa TL-HSSP/CO-INDV05 / Field T city for preparedness and re Individual Consult Open - Internationa Pending Impleme echnical Advisor, Internation TF / B8879 Post 10,598.00 0.00 2022-09-01 2022-10-20 2022-11-10 2022-12-15 2023-06-13 sponse to COVID-19 and oth ant Selection l ntation al er health emergencies at th e community lev el Component 1. Building capa TL-HSSP/CO-INDV12 / Health city for preparedness and re Individual Consult Nutrition specialist lead acros TF / B8879 Post Open - National 29,502.00 0.00 Signed 2022-09-19 2022-11-05 2022-11-07 2023-03-02 2022-11-28 2023-03-20 2023-01-02 2023-07-01 sponse to COVID-19 and oth ant Selection s component 1 & 2 er health emergencies at th e community lev el Component 2. Improving co TL-HSSP/CO-INDV16 / Field mmunity awareness, knowle Monitoring and Evaluation sp TF / B8879 Post Direct Selection Direct - National 62,716.00 0.00 Signed 2022-08-28 2022-09-09 2022-09-07 2022-09-14 2022-11-11 2023-05-10 dge, attitudes, and behaviou ecialist lead r to COVID-19 and other heal th emergencies Component 1. Building capa TL-HSSP/CO-INDV10 / Field T city for preparedness and re Individual Consult Open - Internationa Pending Impleme echnical Advisor, Internation TF / B8879 Post 10,598.00 0.00 2022-09-01 2022-10-20 2022-11-10 2022-12-15 2023-06-13 sponse to COVID-19 and oth ant Selection l ntation al er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV07 / Healt city for preparedness and re Individual Consult Pending Impleme h Nutrition specialist lead acr TF / B8879 Post Open - National 29,502.00 0.00 2022-09-09 2022-10-24 2022-11-14 2022-12-19 2023-06-17 sponse to COVID-19 and oth ant Selection ntation oss component 1 & 2 er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV08 / Field city for preparedness and re Individual Consult Program Manager lead acros TF / B8879 Post Open - National 101,582.00 0.00 Signed 2022-08-29 2022-09-09 2022-10-17 2022-09-14 2022-11-07 2022-09-14 2022-12-12 2023-06-10 sponse to COVID-19 and oth ant Selection s component 1 & 2 (National) er health emergencies at th e community lev el Component 3. Project Manag TL-HSSP/CO-INDV15 / Field S ement and Administration, Individual Consult enior Finance and Admin Offi TF / B8879 Post Open - National 36,510.00 0.00 Signed 2022-09-05 2022-09-09 2022-10-24 2022-10-03 2022-11-14 2022-10-03 2022-12-19 2023-06-17 Monitoring and Evaluation, a ant Selection cer nd Knowledge Dissemination Component 1. Building capa TL-HSSSP/CO-INDV20 / Senio city for preparedness and re Individual Consult r Monitoring and Evaluation TF / B8879 Post Open - National 35,448.00 0.00 Signed 2022-09-09 2022-09-09 2022-10-28 2022-10-03 2022-11-18 2022-10-03 2022-12-23 2023-06-21 sponse to COVID-19 and oth ant Selection Officer. er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV19 / Senio city for preparedness and re Individual Consult TF / B8879 Post Open - National 33,338.00 0.00 Signed 2022-09-09 2022-09-09 2022-10-28 2022-10-03 2022-11-18 2022-10-03 2022-12-23 2023-06-21 r Project Officer Gender sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV18 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 16,103.75 0.00 Signed 2022-09-09 2022-11-05 2022-10-28 2022-11-21 2022-11-18 2022-11-21 2022-12-23 2023-06-21 eque-Project officer 1 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV09 / Viqu city for preparedness and re Individual Consult eque - Deputy Project Manag TF / B8879 Post Open - National 33,254.00 0.00 Canceled 2022-09-09 2022-09-09 2022-10-28 2022-09-16 2022-11-18 2022-12-23 2023-06-21 sponse to COVID-19 and oth ant Selection er er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV14 / Coval city for preparedness and re Individual Consult ima - Deputy Project Manage TF / B8879 Post Open - National 33,254.00 0.00 Signed 2022-09-09 2022-09-09 2022-10-28 2022-11-24 2022-11-18 2022-11-24 2022-12-23 2023-06-21 sponse to COVID-19 and oth ant Selection r er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV17 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,365.71 0.00 Signed 2022-09-05 2022-10-15 2022-10-24 2022-10-28 2022-11-14 2022-10-28 2022-12-19 2023-06-17 eque-Field Officer 1 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV21 / Viqu city for preparedness and re Individual Consult Pending Impleme TF / B8879 Post Open - National 16,103.75 0.00 2022-09-09 2022-10-28 2022-11-18 2022-12-23 2023-06-21 eque-Project officer 2 sponse to COVID-19 and oth ant Selection ntation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV22 / Coval city for preparedness and re Individual Consult TF / B8879 Post Open - National 16,103.75 0.00 Signed 2022-09-09 2022-11-05 2022-10-28 2022-10-27 2022-11-18 2022-10-27 2022-12-23 2023-06-21 ima-Project officer 1 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV23 / Coval city for preparedness and re Individual Consult Pending Impleme TF / B8879 Post Open - National 16,103.75 0.00 2022-09-09 2022-10-28 2022-11-18 2022-12-23 2023-06-21 ima-Project officer 2 sponse to COVID-19 and oth ant Selection ntation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV24 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,365.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-28 2022-11-18 2022-11-28 2022-12-23 2023-06-21 eque-Field Officer 2 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Page 2 Component 1. Building capa TL-HSSSP/CO-INDV25 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-28 2022-11-18 2022-10-28 2022-12-23 2023-06-21 eque-Field Officer 3 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV26 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-28 2022-11-18 2022-10-28 2022-12-23 2023-06-21 eque-Field Officer 4 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV27 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-28 2022-11-18 2022-10-28 2022-12-23 2023-06-21 eque-Field Officer 5 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV28 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-28 2022-11-18 2022-10-28 2022-12-23 2023-06-21 eque-Field Officer 6 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV29 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-28 2022-11-18 2022-11-16 2022-12-23 2023-06-21 eque-Field Officer 7 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV30 / Viqu city for preparedness and re Individual Consult Under Implement TF / B8879 Post Open - National 17,356.71 0.00 2022-09-09 2022-10-15 2022-10-28 2022-11-18 2022-12-23 2023-06-21 eque-Field Officer 8 sponse to COVID-19 and oth ant Selection ation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV31 / Coval city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-11-28 2022-11-18 2022-10-28 2022-12-23 2023-06-21 ima-Field Officer 1 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV32 / Coval city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-11-28 2022-11-18 2022-11-28 2022-12-23 2023-06-21 ima -Field Officer 2 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV33 / Coval city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-27 2022-11-18 2022-10-28 2022-12-23 2023-06-21 ima-Field Officer 3 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV35 / Coval city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-28 2022-11-18 2022-10-28 2022-12-23 2023-06-21 ima -Field Officer 5 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV36 / Coval city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Signed 2022-09-09 2022-10-15 2022-10-28 2022-10-28 2022-11-18 2022-11-28 2022-12-23 2023-06-21 ima-Field Officer 6 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el HSSSP/CO-INV21 / Enumerat Component 1. Building capa ors/Data collectors for data c city for preparedness and re Individual Consult Under Implement TF / B8879 Post Open - National 1,800.00 0.00 2022-09-15 2022-10-21 2022-11-03 2022-11-24 2022-12-29 2023-06-27 ollection to inform Gender an sponse to COVID-19 and oth ant Selection ation d Power analysis. er health emergencies at th e community lev el Component 1. Building capa TL-HSSP/CO-INDV01 / Gende city for preparedness and re Individual Consult Pending Impleme TF / B8879 Post Open - National 7,500.00 0.00 2022-12-23 2023-02-10 2023-03-03 2023-04-07 2023-10-04 r and Power Analysis sponse to COVID-19 and oth ant Selection ntation er health emergencies at th e community lev el Component 1. Building capa TL-HSSP/CO-INDV02 / Nutriti city for preparedness and re Individual Consult Pending Impleme TF / B8879 Post Open - National 5,000.00 0.00 2023-03-14 2023-05-02 2023-05-23 2023-06-27 2023-12-24 on Approach Analyst sponse to COVID-19 and oth ant Selection ntation er health emergencies at th e community lev el Component 3. Project Manag TL-HSSP/CO-INDV03 / Monito ement and Administration, Individual Consult Open - Internationa Pending Impleme TF / B8879 Post 15,000.00 0.00 2023-02-27 2023-04-17 2023-05-08 2023-06-12 2023-12-09 ring and Evaluation Specialist Monitoring and Evaluation, a ant Selection l ntation nd Knowledge Dissemination Component 3. Project Manag TL-HSSP/CO-INDV04 / Evalua ement and Administration, Individual Consult Pending Impleme TF / B8879 Post Open - National 26,250.00 0.00 2023-02-22 2023-04-12 2023-05-03 2023-06-07 2023-12-04 tion Specialist Monitoring and Evaluation, a ant Selection ntation nd Knowledge Dissemination Component 1. Building capa TL-HSSSP/INDV38 / Team Le city for preparedness and re Individual Consult Under Implement TF / B8879 Post Open - National 900.00 0.00 2023-01-18 2022-10-21 2023-03-08 2023-03-29 2023-05-03 2023-10-30 ader - Cov sponse to COVID-19 and oth ant Selection ation er health emergencies at th e community lev el Component 1. Building capa HSSSP/CO-INDV22 / Team le city for preparedness and re Individual Consult Under Implement TF / B8879 Post Open - National 900.00 0.00 2022-09-16 2022-10-28 2022-11-01 2022-11-22 2023-01-11 2023-07-10 ader sponse to COVID-19 and oth ant Selection ation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV42 / Viqu city for preparedness and re Individual Consult Pending Impleme eque - Deputy Project Manag TF / B8879 Post Open - National 33,254.00 0.00 2023-04-21 2023-06-09 2023-06-30 2023-08-04 2024-01-31 sponse to COVID-19 and oth ant Selection ntation er er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV43 / Coval city for preparedness and re Individual Consult Pending Impleme TF / B8879 Post Open - National 16,103.75 0.00 2023-04-21 2023-06-09 2023-06-30 2023-08-04 2024-01-31 ima - Project officer 1 sponse to COVID-19 and oth ant Selection ntation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV34 / Viqu city for preparedness and re Individual Consult TF / B8879 Post Open - National 17,356.71 0.00 Canceled 2022-09-09 2022-10-15 2022-10-28 2022-11-18 2022-12-23 2023-06-21 eque-Field Officer 4 sponse to COVID-19 and oth ant Selection er health emergencies at th e community lev el Component 1. Building capa TL-HSSSP/CO-INDV44 / Coval city for preparedness and re Individual Consult Pending Impleme TF / B8879 Post Open - National 17,365.71 0.00 2023-04-21 2023-06-09 2023-06-30 2023-08-04 2024-01-31 ima - Field Officer 4 sponse to COVID-19 and oth ant Selection ntation er health emergencies at th e community lev el Component 1. Building capa TL-HSSSSP/NC03 / Support f city for preparedness and re Pending Impleme or Community Score Card im TF / B8879 Post Direct Selection Direct - National 80,000.00 0.00 2023-04-25 2023-05-05 2023-07-09 2024-01-05 sponse to COVID-19 and oth ntation plementing partners er health emergencies at th e community lev el Page 3 Component 1. Building capa TL-HSSSP/NC01 / Support co city for preparedness and re Pending Impleme TF / B8879 Post Direct Selection Direct - National 136,000.00 0.00 2023-05-28 2023-06-07 2023-08-11 2024-02-07 st for the WASH partners-01. sponse to COVID-19 and oth ntation er health emergencies at th e community lev el Component 3. Project Manag TL-HSSSP/CO-INDV040 / Mid ement and Administration, Individual Consult Open - Internationa Pending Impleme TF / B8879 Post 15,000.00 0.00 2023-09-04 2023-10-23 2023-11-13 2023-12-18 2024-06-15 Term Review Consultant Monitoring and Evaluation, a ant Selection l ntation nd Knowledge Dissemination Page 4 PROCUREMENT PLAN (Textual Part) Project information: Cash for Jobs Project (P175327) Project Implementation agency: Merankabandi PIU Date of the Procurement Plan: June 17, 2022 Period covered by this Procurement Plan: May 27, 2021 – June 30, 2023 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the country procurement handbook, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. (b) Rights for the Bank to review procurement documentation and activities (c) An effective complaints mechanism. (d) Maintenance of records of the Procurement Process When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works).: Not Applicable Goods: is not applicable Works: is not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is not Applicable. PROCUREMENT Burundi : Cash for Jobs Project PLAN General Information Country: Burundi 2022-06-21 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175327 GPN Date: Project Name: Cash for Jobs Project Loan / Credit No: IDA / D9440 PIU Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MERANKABANDI-337848- GO-RFB / Acquisition de télép Scaling up safety nets to the Single Stage - One E Under Imple IDA / D9440 Post Request for Bids Open - National 537,438.00 0.00 2023-01-31 2023-02-28 2023-02-05 2023-03-09 2023-03-07 2023-04-10 2023-03-28 2023-04-25 2023-05-25 hones en faveur de 24429 bé national territory nvelope mentation néficiaires de la première ph ase BI-MERANKABANDI-338674- GO-RFB / Acquisition du maté Development of Social Prote Single Stage - One E Under Imple riel informatique en faveur d IDA / D9440 Post Request for Bids Open - National 132,350.00 0.00 2023-02-13 2023-03-16 2023-02-18 2023-03-16 2023-03-20 2023-04-17 2023-04-19 2023-05-10 2023-05-13 ction delivery systems nvelope mentation es staffs du Projet ainsi que l es équipements pour l'opérat ionnalisation du MIS BI-MERANKABANDI-338707- GO-RFQ / Acquisition du mobi lier de bureau en faveur du s Project management and im Request for Quota Single Stage - One E Under Imple IDA / D9440 Post Limited 29,729.00 0.00 2023-02-18 2023-05-15 2023-04-01 2023-04-02 taff de la première phase du plementation tions nvelope mentation Projet d'Appui aux Filets Soci aux Productifs et Emplois "M erankabandi II" BI-MERANKABANDI-338715- GO-RFQ / Acquisition des ten Scaling up safety nets to the Request for Quota Single Stage - One E tes et accessoires pour les lie IDA / D9440 Post Limited 73,320.00 0.00 Canceled 2023-03-08 2023-04-19 2023-10-16 national territory tions nvelope ux de formation des bénéfici aires de la première phase d u Projet BI-MERANKABANDI-338727- GO-RFB / Acquisition des ban Scaling up safety nets to the Single Stage - One E Pending Impl cs (4 bancs par espace) pour IDA / D9440 Post Request for Bids Open - National 122,200.00 0.00 2023-03-03 2023-03-08 2023-04-07 2023-05-07 2023-05-28 2023-06-27 national territory nvelope ementation les espaces de formation des bénéficiaires de la première phase du Projet BI-MERANKABANDI-356351- GO-RFQ / Fourniture et install Project management and im Request for Quota Single Stage - One E Under Imple IDA / D9440 Post Limited 13,000.00 0.00 2023-04-22 2023-05-02 2023-05-29 2023-06-18 ation des climatiseurs pour le plementation tions nvelope mentation s nouveaux bureaux du nouv eau personnel NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MERANKABANDI-316035- NC-DIR / Fourniture et param étrage des logiciels de compt Project management and im Direct - Internation abilité (TOM2PRO), de gestio IDA / D9440 Post Direct Selection 70,000.00 0.00 Signed 2022-09-15 2022-09-20 2022-09-20 2022-09-19 2022-10-11 2022-11-10 plementation al n des Ressources Humaines ( TOM2PAIE), du Suivi-Evaluati on (TOM2MONITORING) et de gestion du charroi (TOM2PAR C) BI-MERANKABANDI-344927- NC-RFQ / Recrutement d'une agence de prestation de serv Scaling up safety nets to the Single Stage - One E Under Imple ices de paiement mobile des IDA / D9440 Post Request for Bids Limited 470,691.00 0.00 2023-03-06 2023-03-15 2023-03-11 2023-03-15 2023-04-10 2023-04-14 2023-04-24 2023-05-15 2025-05-14 national territory nvelope mentation bénéficiaires des transferts monétaires pour les bénéfica ires des 4 provinces de la pre mière phase du Projet Cash f or Jobs BI-MERANKABANDI-360375- NC-DIR / Recrutement par en tente directe du PAM comme Integration of refugee and h Direct - Internation Under Imple Agence des Nations Unies sp IDA / D9440 ost communities into nation Prior Direct Selection 3,000,000.00 0.00 2023-05-10 2023-05-25 2023-05-17 2023-06-21 2023-06-07 2025-06-06 al mentation écialisée pour la mise en oeu al social protection systems vre de la Composante 4, Vole t Réfugiés du Projet Cash for Jobs CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MERANKABANDI-302848- CS-CQS / Recrutement d'un c abinet de collecte de donnée Scaling up safety nets to the Consultant Qualifi IDA / D9440 Post Open - National 200,000.00 0.00 Canceled 2022-08-10 2022-09-22 2022-08-25 2022-09-29 2022-10-06 2022-10-27 2022-12-26 s et enregistrement des béné national territory cation Selection ficiaires pour les 4 provinces pilote du Projet Merankaband iI BI-MERANKABANDI-338728- CS-LCS / Recrutement d'un C Project management and im Least Cost Selecti Open - Internationa Under Implement abinet d'Audit financier des c IDA / D9440 Post 30,000.00 0.00 2023-02-15 2023-03-03 2023-03-08 2023-03-29 2023-04-21 2023-05-21 2023-06-20 2023-07-25 2023-08-29 2024-12-30 plementation on l ation omptes du Projet pour les Ex ercices 2022-2023 et 2023-2 024 Page 1 BI-MERANKABANDI-343356- CS-CQS / Recrutement d'un c abinet chargé de la collecte Scaling up safety nets to the Consultant Qualifi des données et enregistreme IDA / D9440 Post Open - National 122,145.00 0.00 Signed 2023-02-22 2023-02-24 2023-03-09 2023-02-27 2023-04-02 2023-04-26 2023-04-09 2023-05-12 2023-04-30 2023-05-21 national territory cation Selection nt des bénéficiaires des 4 pro vinces de la première phase du PAFSPE (Gitega, Karusi, Ki rundo et Ruyigi) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MERANKABANDI-296492- Project management and im Individual Consult CS-INDV / Recrutement d'un IDA / D9440 Post Open 16,744.00 13,749.48 Signed 2021-05-27 2021-05-27 2022-03-25 2022-03-25 2022-04-15 2022-06-30 2022-05-30 2022-07-01 2023-06-30 plementation ant Selection comptable 1 BI-MERANKABANDI-296431- Project management and im Individual Consult CS-INDV / Recrutement d'un IDA / D9440 Post Open 16,744.00 13,749.48 Signed 2021-05-27 2021-05-27 2022-03-25 2022-06-22 2022-04-15 2022-06-30 2022-05-30 2022-07-01 2023-06-30 plementation ant Selection comptable 2 BI-MERANKABANDI-296460- CS-INDV / Recrutement du Sp Project management and im Individual Consult IDA / D9440 Post Open 26,032.00 0.00 Signed 2021-03-15 2021-03-15 2022-04-22 2022-04-22 2022-04-29 2022-06-30 2022-05-30 2023-06-30 écialiste en Normes Environn plementation ant Selection ementales et Sociales BI-MERANKABANDI-296474- Project management and im Individual Consult CS-INDV / Recrutement du Sp IDA / D9440 Post Open 26,032.00 22,347.70 Signed 2021-06-28 2021-06-28 2022-05-04 2022-05-04 2022-05-11 2022-06-30 2022-05-31 2022-07-01 2023-06-30 plementation ant Selection écialiste en Ressources Hum aines BI-MERANKABANDI-296493- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur N IDA / D9440 Post Direct 37,000.00 0.00 Signed 2022-05-20 2022-06-28 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection YABENDA Michel comme Coo rdonnateur National du Proje t BI-MERANKABANDI-296424- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur M IDA / D9440 Post Direct 26,757.00 25,987.38 Signed 2022-05-20 2022-06-26 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2022-07-01 2023-06-30 plementation ant Selection USAFIRI Philbert comme Spéc ialiste en Gestion Financière du Projet BI-MERANKABANDI-296445- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur G IDA / D9440 Post Direct 24,537.00 23,831.27 Signed 2022-05-20 2022-06-28 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2022-07-01 2023-06-30 plementation ant Selection ASANA Donatien comme Spé cialiste en Passation des Mar chés au Projet BI-MERANKABANDI-296491- CS-INDV / Recrutement par e Project management and im Individual Consult Pending Impleme ntente directe de Madame NI IDA / D9440 Post Direct 22,005.00 0.00 2022-05-20 2022-05-30 2022-06-02 2022-06-30 2023-06-30 plementation ant Selection ntation YONZIMA Edwige comme Ch ef Comptable au Projet BI-MERANKABANDI-296442- CS-INDV / Recrutement par e Productive inclusion and acc Individual Consult ntente directe de Monsieur M IDA / D9440 Post Direct 24,030.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 ess to jobs ant Selection VUYEKURE Jean comme Spéc ialiste en Communication au Projet BI-MERANKABANDI-296490- CS-INDV / Recrutement par e Project management and im Individual Consult IDA / D9440 Post Direct 23,697.00 23,015.06 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2022-07-01 2023-06-30 ntente directe de Monsieur N plementation ant Selection ZEYE Guillaume comme Audi teur Interne au Projet BI-MERANKABANDI-296449- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Madame K IDA / D9440 Post Direct 24,537.00 23,831.27 Signed 2022-05-20 2022-06-28 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2022-07-01 2023-06-30 plementation ant Selection ARENZO Jeanne comme Spéc ialiste Chargé des Opérations au Projet BI-MERANKABANDI-296429- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur B IDA / D9440 Post Direct 18,730.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2022-12-27 plementation ant Selection ANDIYIMINSI Ferdinand com me Responsable Provincial d es Opérations au Projet BI-MERANKABANDI-296459- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur N IDA / D9440 Post Direct 18,730.00 18,173.54 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-29 2022-06-30 2022-07-01 2023-06-30 plementation ant Selection TAHONDEREYE Jean Bosco co mme Responsable Provincial des Opérations au Projet BI-MERANKABANDI-296484- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Madame IG IDA / D9440 Post Direct 18,730.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection IRUKWIGOMBA Térèse comm e Responsable Provincial des Opérations au Projet BI-MERANKABANDI-296447- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Madame N IDA / D9440 Post Direct 15,456.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection DABISEMBEREZE Brigitte co mme Assistante du Coordonn ateur BI-MERANKABANDI-296426- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Madame M IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection UTONI Parfaite comme Opéra teur de Terrain au Projet BI-MERANKABANDI-296488- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur N IDA / D9440 Post Direct 11,637.00 11,301.68 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2022-07-01 2023-06-30 plementation ant Selection DAYIRUKIYE Léonidas comme Opérateur de Terrain au Proj et BI-MERANKABANDI-296428- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur D IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection ieudonné NAHIMANA comme Opérateur de Terrain au Proj et Page 2 BI-MERANKABANDI-296454- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur Pl IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection acide NYAMWERU comme Op érateur de Terrain au Projet BI-MERANKABANDI-296483- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur Al IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection exandre ITANGISHAKA comm e Opérateur de Terrain au Pr ojet BI-MERANKABANDI-296451- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur B IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection UTERA Pierre Claver comme Opérateur de Terrain au Proj et BI-MERANKABANDI-296494- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur M IDA / D9440 Post Direct 11,637.00 11,290.28 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2022-07-01 2023-06-30 plementation ant Selection WAMBA Nassibu comme Opé rateur de Terrain au Projet BI-MERANKABANDI-296448- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur N IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection TANGARE Joseph comme Opé rateur de Terrain au Projet BI-MERANKABANDI-296423- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur N IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection YAWENDA Hilaire comme Op érateur de Terrain au Projet BI-MERANKABANDI-296444- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur RI IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection VUZIMANA Ferdinand comme Opérateur de Terrain au Proj et BI-MERANKABANDI-296457- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur CI IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection ZA Jean Bosco comme Opéra teur de Terrain au Projet BI-MERANKABANDI-296452- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur N IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection DIHOKUBWAYO Innocent co mme Opérateur de Terrain a u Projet BI-MERANKABANDI-296467- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur N IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection DAYANSE Jean de Dieu comm e Opérateur de Terrain au Pr ojet BI-MERANKABANDI-296486- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Madame B IDA / D9440 Post Direct 11,637.00 11,297.95 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2022-07-01 2023-06-30 plementation ant Selection UTOYI Rosalie comme Opérat eur de Terrain au Projet BI-MERANKABANDI-296468- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur K IDA / D9440 Post Direct 11,637.00 0.00 Signed 2022-05-20 2022-06-27 2022-05-30 2022-06-29 2022-06-02 2022-06-30 2022-06-30 2023-06-30 plementation ant Selection ARENZO Elias comme Opérat eur de Terrain au Projet BI-MERANKABANDI-296495- CS-INDV / Recrutement par e Project management and im Individual Consult Pending Impleme ntente directe de Madame M IDA / D9440 Post Direct 11,637.00 0.00 2022-05-20 2022-05-30 2022-06-02 2022-06-30 2023-06-30 plementation ant Selection ntation arie Louise IRAMBONA comm e Assistante Logistique au Pr ojet BI-MERANKABANDI-296414- Project management and im Individual Consult CS-INDV / Recrutement du Sp IDA / D9440 Post Open 26,032.00 23,338.57 Signed 2021-06-22 2021-07-22 2022-05-18 2022-05-18 2022-05-20 2022-06-30 2022-05-31 2022-07-01 2023-05-31 plementation ant Selection écialiste des Paiements au Pr ojet BI-MERANKABANDI-302141- CS-INDV / Recrutement du R Project management and im Individual Consult Under Implement esponsable du Suivi-Evaluati IDA / D9440 Post Open 24,536.00 0.00 2022-06-29 2022-08-04 2022-08-17 2022-08-19 2022-09-23 2023-06-30 plementation ant Selection ation on du Projet d'Appui aux Filet s Sociaux Productifs et Emplo is BI-MERANKABANDI-302143- CS-INDV / Recrutement d'un Project management and im Individual Consult Under Implement Responsable Principale en Pa IDA / D9440 Post Open 24,536.00 0.00 2022-07-04 2022-08-05 2022-08-22 2022-08-29 2022-10-03 2023-06-30 plementation ant Selection ation ssation des Marchés pour le Projet d'Appui aux Filets Soci aux Productifs et Emplois BI-MERANKABANDI-302148- CS-INDV / Recrutement d'un Project management and im Individual Consult Under Implement Responsable des Systèmes d' IDA / D9440 Post Open 24,029.00 0.00 2022-07-04 2023-01-18 2022-08-22 2022-08-29 2022-10-03 2023-06-30 plementation ant Selection ation Information au Projet d'Appui aux Filets Sociaux Productifs et Emplois BI-MERANKABANDI-302351- CS-INDV / Recrutement d'un Project management and im Individual Consult Under Implement Responsable des Etudes d'Im IDA / D9440 Post Open 24,029.00 0.00 2022-06-29 2023-01-18 2022-08-17 2022-08-24 2022-09-28 2023-06-30 plementation ant Selection ation pacts au Projet d'Appui aux F ilets Sociaux Productifs et Em plois BI-MERANKABANDI-302126- CS-INDV / Recrutement par e ntente directe de Monsieur RI VUZIMANA Ferdinand comme Project management and im Individual Consult IDA / D9440 Post Direct 24,029.00 0.00 Canceled 2022-06-28 2022-06-28 2022-07-05 2022-06-29 2022-07-06 2022-08-03 2023-06-30 Responsable de l'Inclusion Pr plementation ant Selection oductive et des Mesures d'Ac compagnement au Projet d'A ppui aux Filets Sociaux Produ ctifs et Emplois Page 3 BI-MERANKABANDI-302349- CS-INDV / Recrutement par e Project management and im Individual Consult ntente directe de Monsieur E IDA / D9440 Post Direct 11,636.00 0.00 Canceled 2022-06-29 2022-06-28 2022-07-06 2022-06-29 2022-07-13 2022-08-17 2023-06-30 plementation ant Selection mmanuel NIYONKURU comm e Réceptionniste et Respons able du call center BI-MERANKABANDI-302346- CS-INDV / Recrutement du R esponsable de l'Inclusion des Project management and im Individual Consult IDA / D9440 Post Direct 24,029.00 0.00 Canceled 2022-06-29 2022-07-06 2022-07-13 2022-08-17 2023-06-30 Réfugiés et des Interventions plementation ant Selection d'Urgence au Projet d'Appui aux Filets Sociaux Productifs et Emplois BI-MERANKABANDI-307743- CS-INDV / Recrutement d'un Project management and im Individual Consult Consultant Responsable de l'I IDA / D9440 Post Open - National 24,029.00 0.00 Canceled 2022-08-08 2022-08-18 2022-09-26 2022-10-17 2022-11-21 2023-06-30 plementation ant Selection nclusion Productive et des M esures d'Accompagnement BI-MERANKABANDI-307745- CS-INDV / Recrutement d'un Consultant Responsable de l’I Project management and im Individual Consult Under Implement ntégration des réfugiés et de IDA / D9440 Post Open - National 24,029.00 0.00 2022-08-08 2023-01-04 2022-09-26 2022-10-17 2022-11-21 2023-06-30 plementation ant Selection ation s interventions d’urgence au Projet d'Appui aux Filets Soci aux Productifs et Emplois (M erankabandi II) BI-MERANKABANDI-307751- CS-INDV / Recrutement d'un Consultant Responsable de l' Project management and im Individual Consult Appui à la Politique Nationale IDA / D9440 Post Open - National 24,029.00 0.00 Canceled 2022-08-08 2022-09-26 2022-10-17 2022-11-21 2023-06-30 plementation ant Selection de Protection Sociale au Proj et d'Appui aux Filets Sociaux Productifs et Emplois (Meran kabandi II) BI-MERANKABANDI-307761- CS-INDV / Recrutement d'un Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,636.00 0.00 2022-08-08 2022-08-18 2022-09-26 2022-10-17 2022-11-21 2023-06-30 Consultant Réceptionniste et plementation ant Selection ation Responsable du Centre d'app els BI-MERANKABANDI-302913- CS-CDS / Recrutement par en Development of Social Prote Direct - Internation IDA / D9440 Post Direct Selection 100,000.00 0.00 Signed 2022-08-08 2022-08-12 2022-08-18 2022-08-18 2022-09-06 2023-09-06 tente directe du Cabinet SVF ction delivery systems al TECNO pour compléter le dév eloppement du MIS BI-MERANKABANDI-307754- CS-INDV / Recrutement d'un Consultant Assistant en Com Project management and im Individual Consult IDA / D9440 Post Open - National 15,456.00 0.00 Canceled 2022-08-10 2022-09-28 2022-10-19 2022-11-23 2023-06-30 munication pour le Projet d'A plementation ant Selection ppui aux Filets Sociaux Produ ctifs et Emplois (Merankaban di II) BI-MERANKABANDI-307756- CS-INDV / Recrutement d'un Project management and im Individual Consult Consultant Assistant Adminis IDA / D9440 Post 11,636.00 0.00 Canceled 2022-08-08 2022-09-26 2022-10-17 2022-11-21 2023-06-30 plementation ant Selection tratif au Projet d'Appui aux Fi lets Productifs et Emplois (Me rankabandi II) BI-MERANKABANDI-323084- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Ruyigi pour l plementation ant Selection ation e compte du Projet d'Appui a ux Filets Sociaux Productifs e t Emplois "Merakabandi II" BI-MERANKABANDI-323085- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Nyabitsinda plementation ant Selection ation pour le compte du Projet d'A ppui aux Filets Sociaux Produ ctifs et Emplois "Merakaband i II" BI-MERANKABANDI-323087- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Kinyinya pou plementation ant Selection ation r le compte du Projet d'Appui aux Filets Sociaux Productifs et Emplois "Merakabandi II" BI-MERANKABANDI-323088- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult IDA / D9440 Post Open - National 11,637.00 0.00 Canceled 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Bweru pour l plementation ant Selection e compte du Projet d'Appui a ux Filets Sociaux Productifs e t Emplois "Merakabandi II" BI-MERANKABANDI-323093- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult IDA / D9440 Post Open - National 11,637.00 0.00 Canceled 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Buhiga pour plementation ant Selection le compte du Projet d'Appui a ux Filets Sociaux Productifs e t Emplois "Merakabandi II" BI-MERANKABANDI-323094- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult IDA / D9440 Post Open - National 11,637.00 0.00 Canceled 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Shombo pou plementation ant Selection r le compte du Projet d'Appui aux Filets Sociaux Productifs et Emplois "Merakabandi II" BI-MERANKABANDI-323096- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult IDA / D9440 Post Open - National 11,637.00 0.00 Canceled 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Gitaramuka plementation ant Selection pour le compte du Projet d'A ppui aux Filets Sociaux Produ ctifs et Emplois "Merakaband i II" BI-MERANKABANDI-323099- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement er en commune Bwambarang IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 plementation ant Selection ation we pour le compte du Projet d'Appui aux Filets Sociaux Pr oductifs et Emplois "Merakab andi II" Page 4 BI-MERANKABANDI-323100- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Gitobe pour l plementation ant Selection ation e compte du Projet d'Appui a ux Filets Sociaux Productifs e t Emplois "Merakabandi II" BI-MERANKABANDI-323103- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult IDA / D9440 Post Open - National 11,637.00 0.00 Canceled 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Vumbi pour l plementation ant Selection e compte du Projet d'Appui a ux Filets Sociaux Productifs e t Emplois "Merakabandi II" BI-MERANKABANDI-323105- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Bukirasazi p plementation ant Selection ation our le compte du Projet d'Ap pui aux Filets Sociaux Produc tifs et Emplois "Merakabandi II" BI-MERANKABANDI-323106- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Gishubi pour plementation ant Selection ation le compte du Projet d'Appui a ux Filets Sociaux Productifs e t Emplois "Merakabandi II" BI-MERANKABANDI-323107- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Nyarusange plementation ant Selection ation pour le compte du Projet d'A ppui aux Filets Sociaux Produ ctifs et Emplois "Merakaband i II" BI-MERANKABANDI-323109- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult IDA / D9440 Post Open - National 11,637.00 0.00 Canceled 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Ryansoro po plementation ant Selection ur le compte du Projet d'App ui aux Filets Sociaux Producti fs et Emplois "Merakabandi II " BI-MERANKABANDI-323110- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 11,637.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Makebuko p plementation ant Selection ation our le compte du Projet d'Ap pui aux Filets Sociaux Produc tifs et Emplois "Merakabandi II" BI-MERANKABANDI-323111- CS-INDV / Recrutement du R esponsable Provincial en pro Project management and im Individual Consult Under Implement IDA / D9440 Post Open - National 18,730.00 0.00 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 vince Kirundo pour le compte plementation ant Selection ation du Projet d'Appui aux Filets S ociaux Productifs et Emplois "Merankabandi II" BI-MERANKABANDI-323120- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult IDA / D9440 Post Open - National 11,637.00 0.00 Canceled 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Giheta pour l plementation ant Selection e compte du Projet d'Appui a ux Filets Sociaux Productifs e t Emplois "Merakabandi II" BI-MERANKABANDI-323121- CS-INDV / Recrutement de l' Opérateur de Terrain à affect Project management and im Individual Consult IDA / D9440 Post Open - National 11,637.00 0.00 Canceled 2022-10-31 2023-01-09 2022-12-19 2023-01-09 2023-02-13 2024-02-13 er en commune Mutaho pour plementation ant Selection le compte du Projet d'Appui a ux Filets Sociaux Productifs e t Emplois "Merakabandi II" BI-MERANKABANDI-338710- CS-INDV / Recrutement d'un Consultant pour la productio Scaling up safety nets to the Individual Consult Pending Impleme IDA / D9440 Post Open - National 7,500.00 0.00 2023-02-15 2023-04-05 2023-04-26 2023-05-17 2023-06-16 n du module 1 sur les objecti national territory ant Selection ntation fs du Projet et l'éducation fin ancière de base ainsi que sa boîte à images BI-MERANKABANDI-338711- CS-INDV / Recrutement d'un consultant pour la conceptio Scaling up safety nets to the Individual Consult Pending Impleme IDA / D9440 Post Open - National 10,000.00 0.00 2023-02-07 2023-03-19 2023-04-02 2023-04-23 2023-05-23 n du site web du Projet d'App national territory ant Selection ntation ui aux Filets Sociaux Producti fs et Emplois "Merankabandi II"_Cash for Jobs BI-MERANKABANDI-338953- CS-INDV / Recrutement du R esponsable des VBG et Genr Project management and im Individual Consult Pending Impleme IDA / D9440 Post Open - National 24,029.00 0.00 2023-02-15 2023-04-05 2023-04-26 2023-05-31 2024-05-30 e au sein du Projet d'Appui a plementation ant Selection ntation ux Filets Sociaux Productifs e t Emplois "Merankabandi II"_ Cash for Jobs BI-MERANKABANDI-340133- CS-INDV / Recrutement du R Project management and im Individual Consult Under Implement esponsable Administratif et F IDA / D9440 Post Open - National 26,757.00 0.00 2023-02-06 2023-02-17 2023-03-27 2023-04-17 2023-05-22 2024-05-21 plementation ant Selection ation inancier au Projet d'Appui au x Filets Sociaux Productifs et Emplois "Merankabandi II" BI-MERANKABANDI-340136- CS-INDV / Recrutement du R Project management and im Individual Consult Pending Impleme IDA / D9440 Post Open - National 24,029.00 0.00 2023-02-06 2023-03-27 2023-04-17 2023-05-22 2024-05-21 esponsable de la Collecte de plementation ant Selection ntation s Données et Gestion du Parc Informatique BI-MERANKABANDI-340148- CS-INDV / Recrutement du R Project management and im Individual Consult Under Implement esponsable des Mesures d'Ac IDA / D9440 Post Open - National 24,029.00 0.00 2023-02-06 2023-03-22 2023-03-27 2023-04-17 2023-05-22 2024-05-21 plementation ant Selection ation compagnement pour le dével oppement du capital humain BI-MERANKABANDI-340151- CS-INDV / Recrutement du R Project management and im Individual Consult Under Implement esponsable de l'Inclusion Pro IDA / D9440 Post Open - National 24,029.00 0.00 2023-02-06 2023-03-22 2023-03-27 2023-04-17 2023-05-22 2024-05-21 plementation ant Selection ation ductive au Projet d'Appui aux Filets Sociaux Productifs et E mplois "Merankabandi II" Page 5 BI-MERANKABANDI-343572- CS-CDS / Recrutement par en tente directe des ONGs pour la mise en œuvre des activité Scaling up safety nets to the s complémentaires dans les IDA / D9440 Prior Direct Selection Direct - National 4,459,571.00 0.00 Canceled 2023-02-24 2023-03-15 2023-04-26 2025-10-22 national territory 4 provinces de la 1ère phase à savoir Action Aid pour les p rovinces Ruyigi et Karusi, OD AG CARITAS GITEGA pour Git ega et Pathfinder pour Kirund o BI-MERANKABANDI-356330- CS-CDS / Recrutement par en tente directe de l’ONG Action Scaling up safety nets to the Under Implement IDA / D9440 Prior Direct Selection Direct - National 1,114,893.00 0.00 2023-04-17 2023-05-07 2023-06-11 2026-06-10 Aid pour la mise en œuvre de national territory ation s activités complémentaires dans la province de Karusi BI-MERANKABANDI-356334- CS-CDS / Recrutement par en tente directe de l’ONG Action Scaling up safety nets to the Under Implement IDA / D9440 Prior Direct Selection Direct - National 1,114,893.00 0.00 2023-04-17 2023-05-07 2023-06-11 2026-06-10 Aid pour la mise en œuvre de national territory ation s activités complémentaires dans la province de Ruyigi BI-MERANKABANDI-356336- CS-CDS / Recrutement par en tente directe de l’ONG PATHF Scaling up safety nets to the Under Implement IDA / D9440 Prior Direct Selection Direct - National 1,114,893.00 0.00 2023-04-17 2023-05-07 2023-06-11 2026-06-10 INDER INTERNATIONAL pour l national territory ation a mise en œuvre des activité s complémentaires dans la pr ovince de Kirundo BI-MERANKABANDI-356339- CS-CDS / Recrutement par en tente directe de l’ONG ODAG Scaling up safety nets to the Under Implement IDA / D9440 Prior Direct Selection Direct - National 1,114,893.00 0.00 2023-04-17 2023-05-07 2023-06-11 2026-06-10 CARITAS GITEGA pour la mis national territory ation e en œuvre des activités com plémentaires dans la provinc e de Gitega Page 6 REPUBLIQUE DU BENIN Fraternité – Justice – Travail --------------------- PRESIDENCE DE LA REPUBLIQUE DU BENIN ---------------------- AGENCE DE DEVELOPPEMENT DE L’ENSEIGNEMENT TECHNIQUE (ADET) ----------------------- PROJET D’APPUI À LA FORMATION PROFESSIONNELLE ET A L’ENTREPRENEURIAT POUR L’EMPLOI AU BENIN (PAFPEEB) Financement Banque Mondiale ------------------- PLAN DE PASSATION DE MARCHÉS Information sur le Projet : Agence d’exécution du Projet : Agence de Développement de l’Enseignement Technique (ADET) Date du plan de passation des marchés : ________ Période couverte par ce plan de passation des marchés : _________ PFPEEB : Plan Général de Passation des Marchés Page 1 I. Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016 révisé en Novembre 2017, Août 2018 et Novembre 2020) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées sous réserve de la prise en compte de certaines conditions à préciser dans l’Accord de financement. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : « ne s’applique pas » Travaux : « ne s’applique pas » II. Fournitures, Travaux et Services Assimilés PFPEEB : Plan Général de Passation des Marchés Page 2 1. Seuils d'examen préalable : Marchés qui seront soumis à l'examen préalable de la Banque conformément aux dispositions du paragraphe 3.5 et suivant du Règlement de Passation de Passation des Marchés pour les emprunteurs sollicitant le Financement de Projets d’Investissements (FPI). 2. Préqualification : N/A1 3. Procédures applicables aux Composantes relatives au Développement Conduit par les Communautés (en relation avec le paragraphe 3.17 des Directives) : N/A 4. Référence (si nécessaire) au Manuel opérationnel de passation de marchés : N/A 5. Autres arrangements spécifiques pour la passation de marchés : Non Applicable 1 Non Applicable PFPEEB : Plan Général de Passation des Marchés Page 3 6. Marchés et Planning et Méthode de Passation : Contrats soumis à Nature des Méthode de passation de Valeur seuil du marché examen dépenses marchés $EU préalable de l’IDA 1. Travaux AOI C ≥ 10,000,000 (y compris clés en 200,000 < C < Tous les AON main, Fourniture et 10,000,000 contrats de montage 10,000,000 $US Demande de Cotation – au d’installations et < 200,000 et plus moins 3 offres PPP) 2. Fournitures, AOI C ≥1 000 000 Systèmes AON 100,000 < C <1,000,000 Tous les d’Informations et Consultation de contrats de Services autres Fournisseurs à l’échelle C ≤ 100,000 2,000,000 $EU que les services de Nationale - Au moins 3 et plus Consultants offres Sélection directe Pas de seuil • Marchés de Travaux 1 2 3 4 5 6 7 8 9 Examen Méthod préalab e de Préfére Date Coût le de la passati Pré- nce prévue Réf estimatif Banque Description du on des qualificat national pour Commentai . en (a contrat marché ion e l’ouvertu res No. dollars priori / s ou (oui/non) (oui/no re des EU a sélectio n) offres posteri n ori) Les DAO à lancer en plusieurs Construction de lots selon dix (10) lycées 62 091 1. AOI Non Non Oui 06/10/22 les sites techniques 926 identifiés agricoles dans les départemen ts Les DAO à Aménagement et lancer en constructions des plusieurs infrastructures lots selon des unités 28 163 2. AOI Non Non Oui 07/12/22 les sites économiques pour 968 identifiés les dix (10) lycées dans les techniques départemen agricoles ts Les DAO à Constructions de lancer en 62 047 27/09/10/ 3. sept (07) écoles AOI Non Non Oui plusieurs 683 22 des métiers lots selon les sites PFPEEB : Plan Général de Passation des Marchés Page 4 1 2 3 4 5 6 7 8 9 Examen Méthod préalab e de Préfére Date Coût le de la passati Pré- nce prévue Réf estimatif Banque Description du on des qualificat national pour Commentai . en (a contrat marché ion e l’ouvertu res No. dollars priori / s ou (oui/non) (oui/no re des EU a sélectio n) offres posteri n ori) identifiés dans les départemen ts PFPEEB : Plan Général de Passation des Marchés Page 5 • Marchés de Fournitures 1 2 3 4 5 6 7 8 9 Méthod Examen e de Préfére préalab Date Coût Ré passati Pré- nce le de la prévue estimati f. Description du on des qualificati national Banque pour Commentai f en No contrat marché on e (a priori l’ouvert res dollars . s ou (oui/non) (oui/non /a ure des EU sélectio ) posteri offres n ori) Faire une Acquisition de évaluation mobilier et de détaillée de matériel de toutes les bureau pour structures 1. l’ADET et les 270 000 AON Non Non Non 04/05/22 bénéficiaires structures de ces impliquées dans la fournitures mise en œuvre du afin de projet déterminer les quantités Faire une évaluation Acquisition de détaillée de matériel toutes les informatique au structures profit de l’ADET et 2. 172 000 AON Non Non Non 19/05/22 bénéficiaires les structures de ces impliquées dans la fournitures mise en œuvre du afin de projet déterminer les quantités Faire une évaluation Acquisition de détaillée de véhicules pour le toutes les compte de l’ADET structures 3. et des structures 359 500 AON Non Non Non 26/04/22 bénéficiaires impliquées dans la de ces mise en œuvre du fournitures projet afin de déterminer les quantités Acquisition du matériel de mise 4. 370 370 AON Non Non Non 24/05/22 en place de la base de données PFPEEB : Plan Général de Passation des Marchés Page 6 • Services non consultant 1 2 3 4 5 6 7 8 9 Méthod Examen e de Préfére préalab Date Coût passati Pré- nce le de la prévue Réf estimatif Description du on des qualificati national Banque pour Commenta . en contrat marché on e (a priori l’ouvertu ires No. dollars s ou (oui/non) (oui/non /a re des EU sélectio ) posteri offres n ori) Les logiciels généraleme nt utilisés Acquisition d’un dans le logiciel de gestion cadre de 1. comptable multi- 60 000 DC Non Non Non 09/02/22 l’exécution projets et multi- les projets sites pour l’ADET financés par la BM sont TOMPRO ou MS PROJECT Fourniture d’une 2. bande à haut 20 000 DC Non Non Non 17/03/22 débit pour l’ADET III. SELECTION DE CONSULTANTS2 1. Liste restreinte composée de Consultants Étrangers et Nationaux : La liste restreinte de Consultants pour les services, d’un cout estimatif égale ou supérieur à 100 000 $ US (service de consultant) et 300 0000 $ US (étude et supervision) ou équivalent par contrat, peut être composée de Consultants étrangers et/ou nationaux conformément aux dispositions du Règlement de passation des marchés pour les emprunteurs sollicitant le financement de projet d’investissement. 2. Liste restreinte composée entièrement de Consultants Nationaux : La liste restreinte de Consultants pour les services, d’un cout estimatif inférieur à 300 0000 $ US ou équivalent par contrat, peut être entièrement composée de Consultants nationaux conformément aux dispositions du Règlement de passation des marchés pour les emprunteurs sollicitant le financement de projet d’investissement. 3. Autres arrangements spécifiques pour la sélection : N/A 2SFQC : Sélection Fondée sur la Qualité et le Coût SFQ : Sélection fondée sur la qualité SMC : Sélection au moindre coût SCBD : Sélection dans le cadre d’un budget déterminé SQC : Sélection basée sur les Qualifications des Consultants CI : Consultant Individuel : AMI : Avis à Manifestation d’Intérêt PFPEEB : Plan Général de Passation des Marchés Page 7 4. Contrats de Consultants avec Méthode de Sélection et Planning PFPEEB : Plan Général de Passation des Marchés Page 8 Marchés de consultants Contrats soumis Nature de Méthode de passation de Valeur seuil du contrat à examen dépenses marchés $EU préalable Consultant ≥ 100.000 (liste s internationale service Firmes de consultant) ≥ 300.000 (liste internationale ingénierie, étude et Tout contrat de SFQC, SFQ, SMC, SCBD, QC supervision) 1.000.000 $US < 100.000 (liste ou plus nationale services de consultant) < 300.000 (liste nationale, étude et supervision) Sélection directe Pas de seuil Toutes valeurs / toutes Consultant Individuel (AMI) Tout contrat de Consultant approches 300.000 $US ou s Consultant Individuel (3 < 100.000 plus Individuels CV) Toutes valeurs / toutes Sélection directe approches Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. • Contrats de Consultants 1 2 3 4 5 6 7 Examen3 Méthode Date préalable Coût de prévue Re de la estima passation pour la f. Banque Commentai Description du contrat tif en des soumission No (a priori / res dollars marchés des . a EU ou proposition posteriori sélection s ) Élaboration et validation du plan 1. 65 000 SQC Non 31/03/22 stratégique de l'ADET Élaboration et mise en place d’une base de données de suivi des étudiants et 185 19/04/22 2. SFQC Non diplômés de l’EFTP dans le cadre du 185 projet Recrutement d’une assistance technique pour la mise en place de l’outil SABER et du Workforce Development (WfD) pour des objectifs tels que l’analyse 185 04/05/22 3. SFQC Non comparative des institutions de l’EFTP, la 185 production des données et des connaissances comparatives sur les politiques et les institutions éducatives 313 4. Recrutement d’un Chef équipe projet SCI Oui 02/02/22 000 Recrutement d’un spécialiste en 213 5. SCI Non 02/02/22 Passation des Marchés pour l’ADET 000 3 Oui = Examen préalable Non = Examen à posteriori PFPEEB : Plan Général de Passation des Marchés Page 9 1 2 3 4 5 6 7 Examen3 Méthode Date préalable Coût de prévue Re de la estima passation pour la f. Banque Commentai Description du contrat tif en des soumission No (a priori / res dollars marchés des . a EU ou proposition posteriori sélection s ) 6. Recrutement d’un spécialiste en 213 SCI Non 02/02/22 passation des marchés pour le compte 000 de SEME CITY Recrutement d’un Comptable principal et 441 7. SCI Oui 02/02/22 de deux comptables pour l’ADET 000 Recrutement d’un responsable 213 8. SCI Non 02/02/22 comptable et financier pour SEME CITY 000 Recrutement d’un Spécialiste en Suivi- 213 9. SCI Non 02/02/22 Évaluation 000 Recrutement d’un ingénieur en travaux 213 10. SCI Non 02/02/22 publics 000 Recrutement de 2 spécialistes en impact 257 11. SCI Non 02/02/22 environnemental et social 700 Recrutement d’une firme pour la 750 12. vérification de données basées sur la SFQC Oui 12/04/22 000 performance Recrutement d’un spécialiste en suivi- 213 13. SCI Non évaluation pour SEME CITY 000 Recrutement d’un consultant pour la 17023/22 révision du manuel de procédures 14. 10 000 SCI Non administratives, comptables et financières de SEME CITY Recrutement d’un consultant pour 08/02/22 15. l’élaboration du manuel d’exécution du 26 500 SCI Non projet 16. Recrutement d’un auditeur interne 55 556 SCI Non 22/02/22 Audits Annuels du projet – exercices 21/04/22 17. 55 556 SMC Non 2022, 2023, 2024, 2025, 2026 Recrutement d’un consultant en 102 02/03/22 18. SCI Non communication 000 Recrutement d’une assistance technique pour la mise en place d’un système de gouvernance de l’EFTP basé sur l’implication du secteur 09/06/22 340 19. privé à tous les niveaux avec la prise SFQC Oui 000 des textes et réglementaires pour améliorer l’autonomie institutionnelle y compris le plan stratégique de l’ADET Recrutement d’une assistance technique pour l’élaboration de plans de gestion pour améliorer la 240 09/06/22 20. SFQC Non gouvernance des institutions et 000 l’enseignement et l’apprentissage avec la participation du secteur privé Recrutement d’une assistance technique pour l’élaboration des 240 09/06/22 21. SFQC Non études de traçage par les institutions 000 de l’EFTP Recrutement d’une assistance 240 22. SFQC Non technique pour l’élaboration de 000 PFPEEB : Plan Général de Passation des Marchés Page 10 1 2 3 4 5 6 7 Examen3 Méthode Date préalable Coût de prévue Re de la estima passation pour la f. Banque Commentai Description du contrat tif en des soumission No (a priori / res dollars marchés des . a EU ou proposition posteriori sélection s ) dispositifs de mise en place de 09/06/22 l’autonomie financière et managériale des institutions d’EFTP Recrutement d’une assistance technique pour la mise en place 240 18//04/22 23. d’une formule de financement axée SFQC Non 000 sur la performance pour les établissements d’EFTP Recrutement d’une assistance technique pour la mise en place d’un 240 07/05/22 24. processus interne d’assurance SFQC Non 000 qualité dans les établissements d’EFTP Formation du personnel ciblé sur 390 28/04/22 25. l'ensemble des textes, règlements SFQC Oui 000 et les outils élaborés Recrutement d’un cabinet pour le 92 28/04/22 26. Renforcement du système SQC Non 593 d'assurance qualité de l'EFTP Recrutement d’un chef de 271 02/02/22 27. mission/spécialiste en développement SCI Non 000 des MPME - SEME CITY Recrutement d’un spécialiste genre pour 118 28. SCI Oui 02/02/22 le projet 000 Recrutement d’un responsable juridique 195 29. SCI Oui 02/02/22 - SEME CITY 000 Recrutement d’un spécialiste secteur 195 30. financier/financement des startups - SCI Oui 02/02/22 000 SEME CITY Sélection d’un bureau de recrutement du 31. 40 000 SQC Non 02/02/22 personnel Recrutement de consultants pour la Non 178 32. réalisation d'études d'impact SFQC 19/0522 135 environnemental et social de 10 LTA Recrutement de consultants pour la 124 SFQC Non 33. réalisation d'études d'impact 695 19/05/22 environnemental et social de 07 EM Recrutement de cabinets pour la 267 SFQC Non réalisation des études d'aménagement 204 34. 26/05/22 et d'APD des sites des unités économiques de 10 LTA Recrutement de cabinets pour la 187 SFQC Non réalisation des études d'aménagement 043 35. 19/05/22 et d'APD des sites des unités économiques de 07 EM • Convention 1 2 3 4 5 6 7 8 9 PFPEEB : Plan Général de Passation des Marchés Page 11 Méthode Examen de Préféren préalabl Date Coût passatio Pré- ce e de la prévue Réf. Description du estimatif n des qualificati national Banque pour Commentai No. contrat en dollars marchés on e (a priori l’ouvertur res EU ou (oui/non) (oui/non /a e des sélectio ) posterio offres n ri) Convention de ACISE a été Maîtrise d’Ouvrage identifiée SD Déléguée avec lors de a 1. 480 000 (Entente Non Non Oui N/A ACISE phase Directe) d’évaluation du Projet PFPEEB : Plan Général de Passation des Marchés Page 12 PROCUREMENT Benin : Benin Vocational Education and Entrepreneurship for Jobs Project PLAN General Information Country: Benin 2022-09-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175768 GPN Date: Project Name: Benin Vocational Education and Entrepreneurship for Jobs Project Loan / Credit No: IDA / D9450, IDA / 70110, IDA / 70120 Agency for the Development of Technical Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Bids - BJ-ADET-347025-CW-RFB / T Improving TVET Service Deli Open - Internationa Single Stage - One E Works French Civi 62,091,926.0 Pending Imp 2024-04-1 ravaux de Construction de di IDA / 70110 Prior Request for Bids 0.00 2023-06-26 2023-07-01 2023-08-12 2023-09-11 2023-10-16 very l nvelope l Law (French) SP 0 lementation 3 x (10) lycées techniques agri D coles Request for Bids - BJ-ADET-347096-CW-RFB / T Improving TVET Service Deli Open - Internationa Single Stage - One E Works French Civi 62,047,683.0 Pending Imp 2024-05-1 ravaux de Constructions de s IDA / 70110 Prior Request for Bids 0.00 2023-07-25 2023-07-30 2023-09-10 2023-10-10 2023-11-14 very l nvelope l Law (French) SP 0 lementation 2 ept (07) écoles des métiers D GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-ADET-312021-GO-RFQ / A Strengthening TVET Market cquisition de mobiliers de bur Request for Quota Single Stage - One E Under Imple IDA / D9450 Responsiveness and Govern Post Limited 35,273.00 0.00 2022-09-10 2022-09-19 2022-11-05 2023-05-04 eau au profit de l’UCP des co tions nvelope mentation ance mposantes 1, 2 et 4a du PFP EEB/ADET BJ-ADET-312038-GO-RFQ / A Strengthening TVET Market cquisition de matériels infor Request for Quota Single Stage - One E Under Imple IDA / D9450 Responsiveness and Govern Post Limited 52,910.00 0.00 2022-09-10 2022-09-22 2022-11-05 2023-05-04 matiques au profit de l’UCP d tions nvelope mentation ance es composantes 1, 2 et 4a du PFPEEB/ADET BJ-ADET-312096-GO-RFQ / A cquisition de fournitures de b Strengthening TVET Market Request for Quota Single Stage - One E Under Imple ureau et produits d’entretien IDA / D9450 Responsiveness and Govern Post Limited 17,637.00 0.00 2022-09-11 2022-09-19 2022-11-06 2023-05-05 tions nvelope mentation au profit de l’UCP des compo ance santes 1, 2 et 4a du PFPEEB/ ADET BJ-ADET-312141-GO-DIR / Ac quisition de cinq (05) véhicul Strengthening TVET Market Direct - Internation Under Imple es par Entente Directe avec IDA / D9450 Responsiveness and Govern Post Direct Selection 234,568.00 0.00 2022-09-28 2022-09-28 2022-10-03 2022-09-29 2022-11-07 2023-05-06 al mentation UNOPS au profit de l’UCP de ance s composantes 1, 2 et 4a du PFPEEB/ADET BJ-ADET-350505-GO-RFB / A cquisition des équipements p Improving TVET Service Deli Single Stage - One E Pending Impl IDA / D9450 Post Request for Bids Open - National 53,919.00 0.00 2023-05-15 2023-05-20 2023-07-01 2023-07-31 2023-09-04 2024-03-02 our les plateformes d'appren very nvelope ementation tissage multimédia BJ-ADET-350643-GO-RFQ / A cquisition de matériel inform Strengthening TVET Market atique et équipements pour Single Stage - One E Pending Impl IDA / D9450 Responsiveness and Govern Post Request for Bids Open - National 172,000.00 0.00 2023-04-20 2023-04-25 2023-06-06 2023-07-06 2023-08-10 2024-02-06 visioconférence au profit de l nvelope ementation ance ’ADET et les structures impliquées dans la mise en œuvre du projet. BJ-ADET-350646-GO-RFQ / A Strengthening TVET Market cquisition d'équipements rés Request for Quota Single Stage - One E Pending Impl IDA / 70120 Responsiveness and Govern Post Limited 79,365.00 0.00 2023-06-03 2023-07-29 2024-01-25 eaux, téléphone IP et serveur tions nvelope ementation ance au profit de l'ADET NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-ADET-312103-NC-RFQ / F ourniture et installation par E Strengthening TVET Market Direct - Internation Under Imple ntête Directe avec OM Consu IDA / D9450 Responsiveness and Govern Post Direct Selection 35,273.00 0.00 2022-09-19 2022-09-28 2022-09-24 2022-09-28 2022-10-29 2023-04-27 al mentation lting Projets de logiciel SUCC ance ES et formation au profit des utilisateurs de l’ADET CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-ADET-312008-CS-QCBS / Recrutement d’un Consultant (cabinet) pour l'élaboration d u modèle de gouvernance, d Capacity Building, Project M Quality And Cost- Open - Internationa Under Implement IDA / D9450 Post 340,000.00 0.00 2022-09-05 2022-07-17 2022-09-26 2022-09-30 2022-11-09 2023-01-09 2022-12-07 2023-02-21 2023-01-06 2023-02-10 2023-03-17 2024-03-16 es textes réglementaires ave anagement and Evaluation Based Selection l ation c l'implication du secteur priv é et des règlements accorda nt l'autonomie administrative et financière aux établisseme nts d'EFTP BJ-ADET-312018-CS-QCBS / Recrutement d'un Consultant Capacity Building, Project M Quality And Cost- Open - Internationa Under Implement IDA / D9450 Post 200,000.00 0.00 2022-09-06 2022-07-17 2022-09-27 2022-09-30 2022-11-10 2022-12-06 2022-12-08 2023-02-08 2023-01-07 2023-02-11 2023-03-18 2024-03-17 pour l'élaboration et la valida anagement and Evaluation Based Selection l ation tion du plan stratégique de l' ADET BJ-ADET-312019-CS-QCBS / Recrutement d'une agence in Capacity Building, Project M Quality And Cost- Open - Internationa Under Implement dépendante de vérification d IDA / D9450 Post 750,000.00 0.00 2022-09-07 2022-07-23 2022-09-28 2022-09-30 2022-11-11 2023-01-13 2022-12-09 2023-02-21 2023-01-08 2023-02-12 2023-03-19 2024-03-18 anagement and Evaluation Based Selection l ation e la réalisation des indicateur s des conditions basées sur l a performance (PBC) Page 1 BJ-ADET-312024-CS-QCBS / Recrutement d’une assistanc e technique pour la mise en Capacity Building, Project M Quality And Cost- Open - Internationa Under Implement IDA / D9450 Post 240,000.00 0.00 2022-09-08 2022-07-23 2022-09-29 2023-04-06 2022-11-12 2022-12-10 2023-01-09 2023-02-13 2023-03-20 2024-03-19 place d’une formule de finan anagement and Evaluation Based Selection l ation cement axée la performance pour des établissements d’EF TP BJ-ADET-312028-CS-QCBS / Recrutement d'un Consultant Improving TVET Service Deli Quality And Cost- Open - Internationa Under Implement pour l'élaboration du process IDA / D9450 Post 240,000.00 0.00 2022-09-08 2022-08-24 2022-09-29 2022-09-30 2022-11-12 2023-01-19 2022-12-10 2023-03-02 2023-01-09 2023-02-13 2023-03-20 2024-03-19 very Based Selection l ation us d'assurance qualité dans l es institutions et établisseme nts de l'EFTP BJ-ADET-312030-CS-QCBS / Recrutement d’un consultant pour le développement et la mise en œuvre d'une stratégi Improving TVET Service Deli Quality And Cost- Open - Internationa Under Implement IDA / D9450 Post 881,834.00 0.00 2022-09-12 2022-08-03 2022-10-03 2022-10-25 2022-11-16 2022-12-14 2023-01-13 2023-02-17 2023-03-24 2024-03-23 e de communication au nivea very Based Selection l ation u des Etablissements d'EFTP avec prise en compte des out ils d'information et de comm unication sur les métiers de l' EFTP BJ-ADET-312032-CS-CQS / R ecrutement d’un consultant pour le renforcement des cap Improving TVET Service Deli Consultant Qualifi Open - Internationa Under Implement IDA / D9450 Post 529,101.00 0.00 2022-09-14 2022-08-03 2022-10-05 2022-10-24 2022-11-18 2022-12-18 2023-01-22 2023-07-21 acités des acteurs d’EFTP à c very cation Selection l ation oncevoir et à mettre en place des formations de courte dur ée BJ-ADET-312033-CS-QCBS / Recrutement d'un Consultant pour l'élaboration et la mise Improving TVET Service Deli Quality And Cost- Open - Internationa Under Implement en œuvre d'un dispositif de r IDA / D9450 Post 881,834.00 0.00 2022-09-12 2022-08-30 2022-10-03 2022-11-16 2022-12-14 2023-01-13 2023-02-17 2023-03-24 2024-03-23 very Based Selection l ation enforcement permanent des capacités des formateurs ave c prise en compte du numéri que BJ-ADET-312034-CS-QCBS / Recrutement d’un consultant pour le développement et la mise en œuvre de plates-for Improving TVET Service Deli Quality And Cost- Open - Internationa Under Implement mes d'apprentissage multim IDA / D9450 Post 881,834.00 0.00 2022-09-12 2022-08-03 2022-10-03 2022-12-23 2022-11-16 2022-12-14 2023-01-13 2023-02-17 2023-03-24 2024-03-23 very Based Selection l ation édia, l'utilisation des technol ogies de réalité augmentée/r éalité virtuelle, des applicatio ns d'apprentissage, des labor atoires virtuels et des di BJ-ADET-312036-CS-CQS / R Strengthening TVET Market ecrutement de Consultant po Consultant Qualifi Open - Internationa Under Implement IDA / D9450 Responsiveness and Govern Post 352,734.00 0.00 2022-09-26 2022-09-22 2022-10-17 2022-10-21 2022-11-30 2022-12-30 2023-02-03 2023-08-02 ur le renforcement de capaci cation Selection l ation ance tés des acteurs de l'EFTP BJ-ADET-312162-CS-QCBS / Recrutement d'un Consultant Improving TVET Service Deli Quality And Cost- Open - Internationa Pending Impleme pour la réalisation des étude IDA / 70110 Post 529,101.00 0.00 2022-09-30 2022-10-21 2022-12-04 2023-01-01 2023-01-31 2023-03-07 2023-04-11 2024-04-10 very Based Selection l ntation s techniques pour les écoles de métiers du Textile et des Vêtements BJ-ADET-312184-CS-LCS / Re crutement d’un Cabinet d’au Strengthening TVET Market Least Cost Selecti Under Implement dit pour la réalisation des au IDA / D9450 Responsiveness and Govern Post Open - National 44,092.00 0.00 2022-09-15 2022-11-25 2022-10-06 2022-11-19 2022-12-17 2023-01-16 2023-02-20 2023-03-27 2023-09-23 on ation dits annuels du projet (Exerci ance ces 2022, 2023 & 2024) BJ-ADET-312031-CS-QCBS / Recrutement d’un consultant pour le développement et la Improving TVET Service Deli Quality And Cost- Open - Internationa Under Implement IDA / D9450 Post 529,101.00 0.00 2022-09-21 2022-09-27 2022-10-12 2022-10-10 2022-11-25 2022-12-23 2023-01-22 2023-02-26 2023-04-02 2024-04-01 mise en place de partenariat very Based Selection l ation entre les institutions, les Eta blissements d'EFTP et les inst itutions du secteur privé BJ-ADET-312035-CS-QCBS / Recrutement d’un consultant Improving TVET Service Deli Quality And Cost- Open - Internationa Under Implement pour la réalisation et la mise IDA / D9450 Post 185,185.00 0.00 2022-09-20 2022-09-27 2022-10-11 2022-10-10 2022-11-24 2023-01-04 2022-12-22 2023-01-21 2023-02-25 2023-04-01 2024-03-31 very Based Selection l ation en place d'une plateforme de formation en ligne dans les i nstitutions d'EFTP BJ-ADET-352023-CS-QCBS / Recrutement de Cabinets d'é Improving TVET Service Deli Quality And Cost- Open - Internationa Pending Impleme tude pour le Suivi et le Contr IDA / 70110 Post 1,040,564.00 0.00 2023-04-25 2023-05-16 2023-06-29 2023-07-27 2023-08-26 2023-09-30 2023-11-04 2024-11-03 very Based Selection l ntation ôle des travaux de constructi on des 10 LTA, 07 EM et des 10 UEVP BJ-ADET-352031-CS-QCBS / Recrutement de Bureaux de contrôle technique pour la ré alisation de la mission de con Improving TVET Service Deli Quality And Cost- Open - Internationa Pending Impleme IDA / 70110 Post 164,021.00 0.00 2023-05-16 2023-06-06 2023-07-20 2023-08-17 2023-09-16 2023-10-21 2023-11-25 2024-11-24 trôle technique en vue de l'o very Based Selection l ntation btention de la garantie décen nale des travaux de construc tion/ réhabilitation de 10 LTA et 07 EM INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-ADET-292329-CS-INDV / R ecrutement d'un Consultant I Strengthening TVET Market ndividuel pour l'élaboration d Individual Consult Under Implement IDA / D9450 Responsiveness and Govern Post Limited 12,000.00 0.00 2022-09-30 2022-12-21 2022-10-05 2022-10-26 2022-11-30 2023-05-29 u manuel d'opérations du Pro ant Selection ation ance jet de Formation Professionn elle et d'Entrepreneuriat pour l'Emploi au Bénin (PFPEEB). BJ-ADET-352050-CS-CDS / E ntente directe avec IIPE UNE SCO Dakar pour Assistance T echnique pour l'Elaboration d Improving TVET Service Deli Direct - Internation Under Implement 'un mécanisme d'information IDA / D9450 Post Direct Selection 573,529.00 0.00 2023-04-10 2023-05-08 2023-04-15 2023-06-10 2023-12-07 very al ation et d'orientation des apprena nts et des documents nécess aires à l'appui à la mise en pl ace des réseaux, relecture, l' approfondissement et la fi Page 2 BJ-ADET-352119-CS-CDS / E ntente directe avec le Centre International de formation de l’OIT (CIFOIT), Assistance Tec Capacity Building, Project M Direct - Internation Under Implement hnique pour la Conception d' IDA / D9450 Post Direct Selection 278,231.00 0.00 2023-04-20 2023-05-08 2023-04-30 2023-07-04 2023-12-31 anagement and Evaluation al ation un guide méthodologique d'é laboration de plan de gestion des établissements et autres institutions d'EFTP avec la pa rticipation du secte BJ-ADET-352366-CS-INDV / R ecrutement par Entente direc te du Consultant Individuel G Strengthening TVET Market Individual Consult Direct - Internation Under Implement noléba Mathieu MEGUHE pou IDA / D9450 Responsiveness and Govern Post 17,637.00 0.00 2023-05-10 2023-05-23 2023-05-20 2023-06-10 2023-07-15 2024-01-11 ant Selection al ation r l'actualisation de la Stratégi ance e de Passation des Marchés d u Projet pour Promouvoir le D éveloppement (PPSD) du Proj et FP2E. BJ-ADET-352123-CS-CDS / E ntente directe avec l'Ecole Po lytechnique Fédérale de Zuri Strengthening TVET Market ch (ETH Zurich), Assistance T Direct - Internation Under Implement IDA / D9450 Responsiveness and Govern Post Direct Selection 239,859.00 0.00 2023-04-18 2023-06-07 2023-04-28 2023-07-02 2023-12-29 echnique pour l'élaboration d al ation ance es outils d’évaluation des ins titutions d’EFTP et le Dévelop pement du système de suivi évaluation du Projet FP2E Page 3 Procurement Plan of Maputo Metropolitan Area Urban Mobility Project - Project Preparation Advance I. General Project information Country: Mozambique Project Name: Maputo Metropolitan Area Urban Mobility Project (P171048). Project Implementing Agencies: Ministry of Transport and Communication World Bank’s approval date for the procurement plan: February 15th, 2021 Date of General Procurement Notice: (after Board approval) Period covered by this procurement plan: Project Preparation Advance February 2021 to June 2022 II. Goods, Works and Non-Consulting Services Procurement Packages with Methods and Time Schedule Domesti Estimat Procurem World Expecte Ref. c Contract description ed Cost ent P-Q Bank d Bid No. Prefere (US$) Method Review Opening nce 1. GOODS Purchase of office Shopping/ 30/05/20 1 20,000 No No POST equipment: IT equipment RFQ 21 Purchase of office Shopping/ 30/05/20 2 40,000 No No POST equipment: furniture RFQ 21 TOTAL 60,000 III. Selection of Consultants Prior Review Threshold: Selection decisions subject to Prior Review by the World Bank, as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Contract amount Subject to Prior (US$ equivalent) Review Quality and Cost-Based Selection (QCBS) /Quality Based Above or equal to All above 1. Selection/Fixed Budget/Least 300,000 $500,000 Cost Consultant’s Qualifications 2. below 300,000 None (firms) 3. Single Source (SS) / Firms NA 4. Individual Consultants (IC) NA All above 1 $200,000 All ToRs regardless of the value of the contract are subject to IDA prior review. 1. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $200,000 equivalent per contract, may comprise entirely of national consultants in accordance with this procurement plan 2. Any Other Special Selection Arrangements: N/A Consultancy Assignments with Selection Methods and Time Schedule Estimat Revie Selecti Sour ed w by Expected on ce of No. Description of Assignment Cost the Proposal Metho fund World Submission USD d s Bank Feasibility study of integrated investments to improve Urban 2,000,00 01st August 1 Transport in the project specific area, QCBS YES WB 0 2021 preparation of detailed designs and bidding documents Hiring an Individual consultant to Development of PMUMM Environmental and Social 30th May 2 200,000 IC NO WB Instruments(ESMF, RPF, SEP and 2021 ESCP and other safeguard plans and instruments) Hiring a consulting firm to carry out 01st August 3 the EIA, EAS, ESMP, RAP and other 400,000 QCBS NO WB 2021 safeguard plans and instruments Hiring a consulting firm to conduct NO 30th May 4 Stakeholder Engagement Plan on 200,000 CQS WB 2021 urban transport (12 months) Hiring a consulting firm to conduct a study to increase private NO 30th May 5 participation opportunities in public 150,000 CQS WB 2021 transport and the role of FTC to attract funding (6 months) Hiring a consulting firm to support NO 01st July 6 the development of data capabilities 200,000 CQS WB 2021 in urban transport (12 months) Hiring a consultant to Support project NO 30th May 7 120,000 IC WB management (12 months) 2021 Hiring an engineer consultant to NO provide Technical Support to the 30th May 8 75,000 IC WB Project Preparation Unit during 2021 project preparation. (12 months) 2 Hiring an urban planner consultant to NO provide Technical Support to the 30th May 9 75,000 IC WB Steering Committee during project 2021 preparation (12 months) Hiring social safeguard officer NO consultants to provide Technical 30th May 10 Support to the Steering Committee 75,000 IC WB 2021 during project preparation. (12 months) Hiring environmental safeguard NO officer consultants to provide 30th May 11 Technical Support to the Steering 75,000 IC WB 2021 Committee during project preparation (12 months) Hiring consultant to do fiduciary NO 12 40,000 IC 01st July2021 WB support activities (PPSD) 3,610,0 Total 00 Training and Workshops No Description of Assignment Estimated Cost USD . 1 Individual Consultant to elaborate the Strategy for strengthen institutions in planning and management of 30,000 Urban Transport 2 Training on specific targeted courses 50,000 Total Cost 80,000 SUMMARY OF THE PLAN USD($) GOODS 60,000 CONSULTANCY 3,610,000 TRAINING & WORKSHOPS 80,000 OPERATING COST 100,000 TOTAL PROJECT PREPARATION ADVANCE COST 3,850,000 3 PROCUREMENT Mozambique : Maputo Metropolitan Area Urban Mobility Project PLAN General Information Country: Mozambique 2021-06-04 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175322 GPN Date: 2022-05-05 Project Name: Maputo Metropolitan Area Urban Mobility Project Loan / Credit No: IDA / V3740, / , IDA / E0660 Ministry of Transport and Communications Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Request for B Component 1: Urban Transp MZ-MTC-302049-CW-RFB / P ids - Small W ort Institutional and Regulat Single Stage - One E Under Imple 2023-05-0 roject office building rehabilit IDA / V3740 Post Request for Bids Open - National orks SPD (1 e 0.00 2022-07-17 2022-12-08 2022-07-22 2022-12-09 2022-09-02 2023-01-11 2022-10-02 2023-06-08 2022-11-06 ory Strengthening and Publi nvelope mentation 5 ation nvelope proc c Transport Industry Professi ess) onalization Request for B MZ-MTC-302043-CW-RFB / C Component 1: Urban Transp ids - Works ( onstruction of BRT Running w ort Institutional and Regulat after prequali ays, (including running way i Open - Internationa Single Stage - One E Pending Imp 2025-06-2 IDA / V3740 ory Strengthening and Publi Prior Request for Bids fication) SPD 0.00 2023-06-01 2023-08-17 2023-08-17 2023-06-06 2023-10-26 2023-11-25 2023-12-30 nfrastructure: junctions upgr l nvelope lementation 2 c Transport Industry Professi - Applying co ades in BRT corridor; parking onalization ntractor disq management in BRT corridor; ualificiation NMT in BRT corridor), Works 10/W/MMAUMP/22 / RAMBLA ” Pedestrian Streets Project: Request for B Pedestrianization of Rua de B Component 3: Comprehensi ids - Works ( agamoyo connecting Praça d ve Improvements for Safe A Single Stage - One E Pending Imp 2024-02-0 IDA / V3740 Post Request for Bids Open - National without preq 0.00 2022-10-17 2022-10-22 2022-12-03 2023-01-02 2023-02-06 a Independência, Praça 25 d ccess to Neighborhoods and nvelope lementation 5 ualification) e Junho and Praça dos Trabal Corridor Integration SPD hadores and construction of a wall protecting pedestrian zone. Request for B Component 3: Comprehensi 15/W/MMAUMP/22 / Paving o ids - Small W ve Improvements for Safe A Single Stage - One E Under Imple 2024-03-1 f 3 roads: Khongolote / Mulu IDA / V3740 Post Request for Bids Open - National orks SPD (1 e 0.00 2022-11-28 2023-03-28 2022-12-03 2023-03-28 2023-01-14 2023-05-10 2023-02-13 2023-03-20 ccess to Neighborhoods and nvelope mentation 8 mbela 2km nvelope proc Corridor Integration ess) Request for B Component 3: Comprehensi 13/W/MMAUMP/22 / Road Re ids - Small W ve Improvements for Safe A Single Stage - One E Under Imple 2024-03-1 habilitation: Bosquisso/Intaka IDA / V3740 Post Request for Bids Open - National orks SPD (1 e 0.00 2022-11-25 2023-03-28 2022-11-30 2023-03-28 2023-01-11 2023-05-10 2023-02-10 2023-03-17 ccess to Neighborhoods and nvelope mentation 7 , 8.7km nvelope proc Corridor Integration ess) Request for B Component 3: Comprehensi 14/W/MMAUMP/22 / Road Pa ids - Small W ve Improvements for Safe A Single Stage - One E Under Imple 2024-03-1 ving Matlemele - Matibjana IDA / V3740 Post Request for Bids Open - National orks SPD (1 e 0.00 2022-11-25 2023-03-28 2022-11-30 2023-03-28 2023-01-11 2023-05-10 2023-02-10 2023-03-17 ccess to Neighborhoods and nvelope mentation 7 5.5Km nvelope proc Corridor Integration ess) Request for B Component 3: Comprehensi 16/W/MMAUMP/22 / Landwor ids - Small W ve Improvements for Safe A Single Stage - One E Under Imple 2023-09-1 k and Construction of the DE IDA / V3740 Post Request for Bids Open - National orks SPD (1 e 0.00 2022-11-30 2023-03-28 2022-12-05 2023-03-28 2023-01-16 2023-04-28 2023-02-15 2023-03-22 ccess to Neighborhoods and nvelope mentation 8 POT fence nvelope proc Corridor Integration ess) 19/W/MMAUMP/23 / Rehabilit Request for B ation of Avenida 24 de Julho Component 3: Comprehensi ids - Small W between Praça 16 de Junho a ve Improvements for Safe A Single Stage - One E Under Imple 2025-07-2 IDA / V3740 Post Request for Bids Open - National orks SPD (1 e 0.00 2023-04-03 2023-04-06 2023-04-08 2023-04-06 2023-05-20 2023-05-09 2023-06-19 2023-07-24 nd Av. da Zambia, including ccess to Neighborhoods and nvelope mentation 4 nvelope proc Av. da Tânzania to Praça 21 Corridor Integration ess) de Outubro and the relocatio n of the Eduardo Statue / 3,2 km 20/W/MMAUMP/23 / Rehabilit Request for B Component 3: Comprehensi ation of Avenida da ONU and ids - Small W ve Improvements for Safe A Single Stage - One E Under Imple 2025-07-2 improvement of its interface IDA / V3740 Post Request for Bids Open - National orks SPD (1 e 0.00 2023-04-03 2023-04-06 2023-04-08 2023-04-06 2023-05-20 2023-05-09 2023-06-19 2023-07-24 ccess to Neighborhoods and nvelope mentation 4 with Avenidas Fernão de Mag nvelope proc Corridor Integration alhães and 25 de Setembro/A ess) v. of the Resorts 1,7km GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Urban Transp MZ-MTC-236275-GO-RFQ / P ort Institutional and Regulat Request for Quota Single Stage - One E urchase of office equipment: IDA / E0660 Post Limited 17,701.00 Signed 2021-06-25 2022-05-05 2021-08-20 2022-08-08 2022-02-16 ory Strengthening and Publi tions nvelope IT equipment c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-236305-GO-RFQ / P ort Institutional and Regulat Request for Quota Single Stage - One E urchase of office equipment: IDA / V3740 Post Limited 0.00 Signed 2021-06-25 2022-09-01 2021-08-20 2022-02-16 ory Strengthening and Publi tions nvelope Furniture c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301952-CW-RFB / B ort Institutional and Regulat Single Stage - One E Pending Impl IDA / V3740 Prior Request for Bids Open - National 0.00 2023-07-20 2023-07-25 2023-09-05 2023-10-05 2023-11-09 2024-05-07 RT Control Center ory Strengthening and Publi nvelope ementation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301941-GO-RFB / Pr ort Institutional and Regulat Single Stage - One E ocurement of 9 vehicles for P IDA / V3740 Post Request for Bids Open - National 0.00 Signed 2022-07-20 2022-10-17 2022-07-25 2022-10-17 2022-09-05 2022-11-14 2022-10-05 2022-12-26 2022-11-09 2023-05-08 ory Strengthening and Publi nvelope CU/PTUs c Transport Industry Professi onalization 21/G/MMAUMP/23 / IT Equip Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl IDA / V3740 Post Limited 0.00 2023-04-25 2023-06-20 2023-12-17 ment's ement, Monitoring and Evalu tions nvelope ementation ation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-MTC-235079-CS-CQS / Hi Component 1: Urban Transp ring a consulting firm to cond ort Institutional and Regulat uct a study to increase privat Consultant Qualifi Open - Internationa IDA / V3740 ory Strengthening and Publi Post 0.00 Signed 2021-06-30 2021-08-24 2021-07-21 2021-09-13 2021-09-03 2022-01-03 2021-10-03 2022-10-13 2021-11-07 2022-05-06 e participation opportunities i cation Selection l c Transport Industry Professi n public transport and the rol onalization e of the transport and comm unications fund MZ-MTC-235098-CS-QCBS / Component 1: Urban Transp Feasibility study of integrate ort Institutional and Regulat d investiments to improve ur Quality And Cost- Open - Internationa IDA / V3740 ory Strengthening and Publi Prior 0.00 Canceled 2021-07-04 2021-08-11 2021-07-25 2021-08-16 2021-09-07 2021-11-25 2021-10-05 2022-01-10 2021-11-04 2022-02-28 2021-12-09 2022-01-13 2023-01-13 ban transport in the project s Based Selection l c Transport Industry Professi pecific area, preparation of d onalization etailed designs and bidding d ocuments Component 1: Urban Transp MZ-MTC-267066-CS-QCBS / ort Institutional and Regulat Quality And Cost- Open - Internationa Under Implement Strategic Environmental and IDA / V3740 Post 0.00 2021-12-08 2021-12-22 2021-12-29 2022-02-01 2022-02-11 2022-03-11 2022-04-10 2022-05-15 2022-06-19 2023-06-19 ory Strengthening and Publi Based Selection l ation Social Assessment (SESA) c Transport Industry Professi onalization MZ-MTC-235076-CS-CQS / Hi ring a consulting firm to cond Consultant Qualifi Open - Internationa / Post 0.00 Canceled 2021-06-20 2021-07-11 2021-08-24 2021-09-23 2021-10-28 2022-04-26 uct stakeholder engagement cation Selection l plan on urban transport MZ-MTC-235081-CS-CQS / Hi ring a consulting firm to supp Consultant Qualifi Open - Internationa / Post 0.00 Canceled 2021-06-15 2021-07-06 2021-08-19 2021-09-18 2021-10-23 2022-04-21 ort the development of data cation Selection l capabilities in urban transpor t MZ-MTC-235074-CS-QCBS / Component 1: Urban Transp Hiring a consulting firm to ca ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme IDA / V3740 Post 0.00 2022-05-10 2022-05-31 2022-07-14 2022-08-11 2022-09-10 2022-10-15 2022-11-19 2023-11-19 rry out the EIA, EAS, ESMP, R ory Strengthening and Publi Based Selection l ntation AP and other safeguard plans c Transport Industry Professi and instruments onalization MZ-MTC-300140-CS-QCBS / Component 1: Urban Transp Feasibility Study of Integrate ort Institutional and Regulat d Investments to Improve Ur Quality And Cost- Open - Internationa IDA / V3740 ory Strengthening and Publi Prior 0.00 Signed 2022-06-24 2022-06-29 2022-07-15 2022-08-28 2022-07-20 2022-09-25 2022-08-30 2022-10-25 2023-04-07 2022-11-29 2023-04-17 2023-01-03 2023-06-20 2024-01-03 ban Transport in the Project s Based Selection l c Transport Industry Professi pecific Areas, Preparation of onalization Detailed Designs and Bidding Documents MZ-MTC-301970-CS-QCBS / Component 1: Urban Transp Enhancement of the Instituti ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme IDA / V3740 Prior 0.00 2022-08-15 2022-09-05 2022-10-19 2022-11-16 2022-12-16 2023-01-20 2023-02-24 2024-02-24 onal Framework for Urban M ory Strengthening and Publi Based Selection l ntation obility in the Maputo Metropo c Transport Industry Professi litam Area onalization MZ-MTC-301977-CS-QCBS / Component 1: Urban Transp Enhancement of the regulato ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme IDA / V3740 Prior 0.00 2022-08-15 2022-09-05 2022-10-19 2022-11-16 2022-12-16 2023-01-20 2023-02-24 2024-02-24 ry framework of public transp ory Strengthening and Publi Based Selection l ntation ort c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-302017-CS-QCBS / ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme Development of Social Mana IDA / V3740 Prior 0.00 2022-09-15 2022-10-06 2022-11-19 2022-12-17 2023-01-16 2023-02-20 2023-03-27 2024-03-26 ory Strengthening and Publi Based Selection l ntation gement Plan c Transport Industry Professi onalization MZ-MTC-302024-CS-QCBS / Component 1: Urban Transp Preparation of pedestrian, cy ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme IDA / V3740 Prior 0.00 2023-01-05 2023-01-26 2023-03-11 2023-04-08 2023-05-08 2023-06-12 2023-07-17 2024-07-16 cling, mobility, and parking ory Strengthening and Publi Based Selection l ntation management plans c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-302030-CS-QCBS / ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme Development of traffic mana IDA / V3740 Prior 0.00 2022-12-01 2022-12-22 2023-02-04 2023-03-04 2023-04-03 2023-05-08 2023-06-12 2024-06-11 ory Strengthening and Publi Based Selection l ntation gement improvement plan c Transport Industry Professi onalization MZ-MTC-301984-CS-QCBS / Component 1: Urban Transp Assistance in developing and ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme IDA / V3740 Prior 0.00 2022-10-02 2022-10-23 2022-12-06 2023-01-03 2023-02-02 2023-03-09 2023-04-13 2024-04-12 implementing capacity buildi ory Strengthening and Publi Based Selection l ntation ng for public transport sector c Transport Industry Professi staff onalization Component 1: Urban Transp MZ-MTC-302035-CS-QCBS / ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme Supervision of BRT constructi IDA / V3740 Prior 0.00 2023-01-01 2023-01-22 2023-03-07 2023-04-04 2023-05-04 2023-06-08 2023-07-13 2024-07-12 ory Strengthening and Publi Based Selection l ntation on c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-303531-CS-LCS / Ex ort Institutional and Regulat Least Cost Selecti IDA / V3740 Post Open - National 0.00 Canceled 2022-10-01 2022-10-22 2022-12-05 2023-01-02 2023-02-01 2023-03-08 2023-04-12 2024-04-11 ternal Auditor ory Strengthening and Publi on c Transport Industry Professi onalization 04/CONS/MMAUMP/22 / Dev Component 1: Urban Transp elopment and implementatio ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme IDA / V3740 Prior 0.00 2022-10-10 2022-10-31 2022-12-14 2023-01-11 2023-02-10 2023-03-17 2023-04-21 2025-04-20 n of Young Professionals Prog ory Strengthening and Publi Based Selection l ntation ram in Urban Mobility c Transport Industry Professi onalization 05/CONS/MMAUMP/22 / Prep Component 1: Urban Transp aration and implementation ort Institutional and Regulat Quality And Cost- Open - Internationa Pending Impleme of a professionalization progr IDA / V3740 ory Strengthening and Publi Prior 0.00 2022-10-17 2022-11-07 2022-12-21 2023-01-18 2023-02-17 2023-03-24 2023-04-28 2024-04-27 Based Selection l ntation am of existing formal and inf c Transport Industry Professi ormal operators along the pr onalization oject corridor 11/CONS/MMAUMP/22 / Supe Component 3: Comprehensi rvision of road improvement ve Improvements for Safe A Quality And Cost- Open - Internationa Under Implement IDA / V3740 Prior 0.00 2022-09-26 2023-01-26 2022-10-17 2023-02-14 2022-11-30 2022-12-28 2023-01-27 2023-03-03 2023-04-07 2024-04-06 contracts in Maputo and Mat ccess to Neighborhoods and Based Selection l ation ola Municipalities (quick-win) Corridor Integration Component 3: Comprehensi 12/CONS/MMAUMP/22 / Supe ve Improvements for Safe A Quality Based Sel Under Implement rvision woks of the office buil IDA / V3740 Post Open - National 0.00 2022-09-30 2022-11-25 2022-10-21 2023-02-08 2022-12-04 2023-01-01 2023-01-31 2023-03-02 2023-04-06 2024-04-05 ccess to Neighborhoods and ection ation ding rehabilitation Corridor Integration 24/CONS/MMAUP/23 / Suppo Component 3: Comprehensi rt AMT to establish a compre ve Improvements for Safe A Quality And Cost- Open - Internationa Pending Impleme hensive data collection and IDA / V3740 Prior 0.00 2023-07-03 2023-07-24 2023-09-06 2023-10-04 2023-11-03 2023-12-08 2024-01-12 2025-01-11 ccess to Neighborhoods and Based Selection l ntation management system for urb Corridor Integration an mobility planning and tran sit management. Page 2 23/CONS/MMAUMP/23 / Recr Component 4: Project Manag Quality Based Sel uitment of Service Provider f IDA / V3740 ement, Monitoring and Evalu Post Open - National 0.00 Under Review 2023-06-01 2023-05-30 2023-06-22 2023-08-05 2023-09-02 2023-10-02 2023-11-01 2023-12-06 2025-12-05 ection or GBV/EAS/AS ation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MZ-MTC-234889-CS-CQS / Hi Component 1: Urban Transp ring a consultant to develop ort Institutional and Regulat Individual Consult ment of PMUMM environment IDA / V3740 ory Strengthening and Publi Post Open 179,838.96 Signed 2021-06-15 2021-06-10 2021-08-03 2021-10-08 2021-08-24 2021-10-18 2021-09-28 2021-10-23 2022-03-27 ant Selection al and social instruments ( ES c Transport Industry Professi MF, RPF, SEP and ESCP and o onalization ther safeguard plans MZ-MTC-235033-CS-INDV / h Component 1: Urban Transp iring social safeguard officer ort Institutional and Regulat Individual Consult consultants to provide techni IDA / V3740 ory Strengthening and Publi Post Open 60,500.00 Signed 2021-06-15 2021-06-14 2021-08-03 2021-12-17 2021-08-24 2021-12-17 2021-09-28 2021-12-18 2022-03-27 ant Selection cal support to the steering co c Transport Industry Professi mmittee during project prepa onalization ration MZ-MTC-235071-CS-INDV / H Component 1: Urban Transp iring environmental safeguar ort Institutional and Regulat Individual Consult d officer consultants to provi IDA / V3740 ory Strengthening and Publi Post Open 60,500.00 Signed 2021-06-15 2021-06-14 2021-08-03 2021-12-03 2021-08-24 2022-01-05 2021-09-28 2022-01-22 2022-03-27 ant Selection de technical support to the st c Transport Industry Professi eering committee during proj onalization ect preparation MZ-MTC-235092-CS-INDV / H iring an engineer consultant t Individual Consult Under Implement o provide technical support t / Post Open 0.00 2021-06-20 2021-12-23 2021-08-08 2021-08-29 2021-10-03 2022-04-01 ant Selection ation o the project preparation unit during project preparation MZ-MTC-235096-CS-INDV / H iring an urban planner consul Individual Consult Under Implement tant to provide technical sup / Post Open 0.00 2021-06-30 2021-12-08 2021-08-18 2022-05-04 2021-09-08 2021-10-13 2022-04-11 ant Selection ation port to the steering committe e during project preparation MZ-MTC-235097-CS-INDV / H Component 1: Urban Transp iring a consultancy service f ort Institutional and Regulat Individual Consult IDA / V3740 Prior Open 29,843.75 Signed 2021-06-25 2021-08-24 2021-08-13 2021-12-13 2021-09-03 2022-01-10 2021-10-08 2022-01-27 2022-04-06 or the preparation of the pro ory Strengthening and Publi ant Selection curement Strategies ( PPSD) c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-267215-CS-INDV / P ort Institutional and Regulat Individual Consult IDA / V3740 Prior Open 90,000.00 Signed 2021-12-08 2021-12-23 2022-01-23 2022-06-17 2022-01-28 2022-07-11 2022-02-07 2022-07-05 2022-10-31 rocurement Specialist ory Strengthening and Publi ant Selection c Transport Industry Professi onalization MZ-MTC-275341-CS-INDV / I Component 1: Urban Transp ndividual Consultant to Elabo ort Institutional and Regulat Individual Consult rate the Strategy for Strengt IDA / V3740 ory Strengthening and Publi Post Open 0.00 Terminated 2022-01-31 2022-06-05 2022-03-21 2022-10-13 2022-04-11 2022-09-27 2022-05-16 2022-11-12 ant Selection hen Institutions in Planning a c Transport Industry Professi nd Management of Urban Tra onalization nsport Component 1: Urban Transp MZ-MTC-235091-CS-INDV / H ort Institutional and Regulat Individual Consult iring a consultant to support IDA / V3740 Post Open 0.00 Signed 2021-06-15 2022-06-24 2021-08-03 2022-11-08 2021-08-24 2022-11-29 2021-09-28 2022-03-27 ory Strengthening and Publi ant Selection project management c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-290333-CS-INDV / C ort Institutional and Regulat Individual Consult IDA / V3740 Post Open 0.00 Signed 2022-04-22 2022-06-06 2022-06-10 2022-10-21 2022-07-01 2022-11-14 2022-08-05 2023-02-01 ommunication Specialist ory Strengthening and Publi ant Selection c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-300286-CS-INDV / F ort Institutional and Regulat Individual Consult IDA / V3740 Post Open 0.00 Signed 2022-11-15 2022-06-24 2023-01-03 2022-10-11 2023-01-24 2022-10-20 2023-02-28 2023-08-27 inancial Manager ory Strengthening and Publi ant Selection c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-300485-CS-INDV / ort Institutional and Regulat Individual Consult Monitoring & Evaluation Spec IDA / V3740 Post Open 0.00 Signed 2022-11-10 2022-09-16 2022-12-29 2023-05-24 2023-01-19 2023-05-28 2023-02-23 2023-08-22 ory Strengthening and Publi ant Selection ialist c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-300489-CS-INDV / T ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Post Open 0.00 2022-11-15 2022-11-02 2023-01-03 2023-01-24 2023-02-28 2023-08-27 ransport Planner ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-300490-CS-INDV / A ort Institutional and Regulat Individual Consult IDA / V3740 Post Open 0.00 Signed 2022-11-15 2022-07-08 2023-01-03 2022-11-29 2023-01-24 2022-12-26 2023-02-28 2023-08-27 dministrative Assistant ory Strengthening and Publi ant Selection c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301020-CS-INDV / L ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Prior Open 0.00 2022-07-10 2022-12-07 2022-08-28 2022-09-18 2022-10-23 2023-04-21 awyer ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301642-CS-INDV / S ort Institutional and Regulat Individual Consult ocial and Resettlement Speci IDA / V3740 Post Open 0.00 Signed 2022-08-06 2022-07-08 2022-09-24 2022-11-29 2022-10-15 2022-12-14 2022-11-19 2023-05-18 ory Strengthening and Publi ant Selection alist c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301646-CS-INDV / E ort Institutional and Regulat Individual Consult IDA / V3740 Post Open 0.00 Signed 2022-08-06 2022-08-16 2022-09-24 2023-02-13 2022-10-15 2023-02-17 2022-11-19 2023-05-18 nvironmental Specialist ory Strengthening and Publi ant Selection c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301654-CS-INDV / H ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Post Open 0.00 2022-09-10 2022-08-05 2022-10-29 2022-11-19 2022-12-24 2023-06-22 ealth and Safety Specialist ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301697-CS-INDV / S ort Institutional and Regulat Individual Consult ocial and Resettlement Speci IDA / V3740 Post Open 0.00 Signed 2022-07-15 2022-07-08 2022-09-02 2022-11-29 2022-09-23 2022-12-15 2022-10-28 2023-04-26 ory Strengthening and Publi ant Selection alist (Matola) c Transport Industry Professi onalization Page 3 Component 1: Urban Transp MZ-MTC-301699-CS-INDV / E ort Institutional and Regulat Individual Consult Under Implement nvironmental, Health and Saf IDA / V3740 Post Open 0.00 2022-08-15 2023-03-06 2022-10-03 2022-10-24 2022-11-28 2023-05-27 ory Strengthening and Publi ant Selection ation ety Specialist c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301705-CS-INDV / ort Institutional and Regulat Individual Consult Gender Based Violence, Exp IDA / V3740 Post Open 0.00 Signed 2022-07-15 2022-07-08 2022-09-02 2023-03-29 2022-09-23 2023-04-06 2022-10-28 2023-04-26 ory Strengthening and Publi ant Selection ert c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301889-CS-INDV / C ort Institutional and Regulat Individual Consult Pending Impleme IDA / V3740 Post Open 0.00 2022-09-05 2022-10-24 2022-11-14 2022-12-19 2023-06-17 ontract Manager ory Strengthening and Publi ant Selection ntation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301905-CS-INDV / C ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Post Open 0.00 2022-09-05 2023-06-22 2022-10-24 2022-11-14 2022-12-19 2023-06-17 apacity Building Specialist ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301909-CS-INDV / U ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Post Open 0.00 2022-09-05 2022-10-20 2022-10-24 2022-11-14 2022-12-19 2023-06-17 rban Transport Specialist ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301912-CS-INDV / S ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Post Open 0.00 2022-08-15 2022-08-01 2022-10-03 2022-10-24 2022-11-28 2023-05-27 enior Civil Engineer ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301927-CS-INDV / E ort Institutional and Regulat Individual Consult Pending Impleme IDA / V3740 Post Open 0.00 2022-08-05 2022-09-23 2022-10-14 2022-11-18 2023-05-17 lectronic Engineer ory Strengthening and Publi ant Selection ntation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301932-CS-INDV / S ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Post Open 0.00 2022-08-15 2022-08-01 2022-10-03 2022-10-24 2022-11-28 2023-05-27 enior Civil Engineer ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-303291-CS-INDV / P ort Institutional and Regulat Individual Consult Pending Impleme IDA / V3740 Prior Open 0.00 2022-07-11 2022-08-29 2022-09-19 2022-10-24 2023-10-24 rocurement Assistant ory Strengthening and Publi ant Selection ntation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-303293-CS-INDV / P ort Institutional and Regulat Individual Consult IDA / V3740 Prior Open 0.00 Signed 2022-07-15 2022-09-28 2022-09-02 2023-03-09 2022-09-23 2023-04-17 2022-10-28 2023-10-28 rocurement Officer ory Strengthening and Publi ant Selection c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301917-CS-INDV / A ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Post Open 0.00 2022-08-01 2022-10-11 2022-09-19 2022-10-10 2022-11-14 2023-11-14 rchitect and Physical Planner ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301650-CS-INDV / ort Institutional and Regulat Individual Consult Pending Impleme Gender Based Violence Exper IDA / V3740 Post Open 0.00 2022-07-13 2022-08-31 2022-09-21 2022-10-26 2023-10-26 ory Strengthening and Publi ant Selection ntation t c Transport Industry Professi onalization 07/CONS/MMAUMP/22 / Proje Component 4: Project Manag Individual Consult IDA / V3740 Post Limited 0.00 Signed 2022-09-23 2022-10-04 2022-09-28 2022-11-22 2022-10-10 2022-12-08 2022-10-24 2022-12-23 ct Implementation Manual (PI ement, Monitoring and Evalu ant Selection M). ation 09/CONS/MMAUMP/22 / Gen Component 4: Project Manag Individual Consult IDA / V3740 Post Open - National 0.00 Signed 2022-09-20 2022-10-18 2022-11-08 2023-05-26 2022-11-29 2023-06-01 2023-01-03 2025-01-02 der Based Violence, ement, Monitoring and Evalu ant Selection ation 08/CONS/MMAUMP/22 / Soci Component 4: Project Manag IDA / V3740 Post Direct Selection Direct - National 0.00 Signed 2022-09-30 2022-11-19 2022-10-10 2023-02-07 2022-12-14 2024-12-13 al Safeguard Specialist ement, Monitoring and Evalu ation 06/CONS/MMAUMP/22 / Tech Component 1: Urban Transp nical support for defining and ort Institutional and Regulat Individual Consult Pending Impleme IDA / V3740 Post Open - National 0.00 2022-11-16 2023-01-04 2023-01-25 2023-03-01 2025-02-28 procurement of buses and bu ory Strengthening and Publi ant Selection ntation s depot c Transport Industry Professi onalization Component 1: Urban Transp 03/CONS/MMAUMP/22 / Tran ort Institutional and Regulat Individual Consult Under Implement IDA / V3740 Post Open - National 0.00 2022-10-05 2022-10-11 2022-11-23 2022-12-14 2023-02-16 2025-02-16 sport Economist ory Strengthening and Publi ant Selection ation c Transport Industry Professi onalization 02/CONS/MMAUMP/22 / Tech Component 1: Urban Transp nical support for defining and ort Institutional and Regulat Individual Consult Pending Impleme IDA / V3740 Post Open - National 0.00 2022-10-12 2022-11-30 2022-12-21 2023-01-25 2025-01-27 implementing of BRT Control ory Strengthening and Publi ant Selection ntation Center c Transport Industry Professi onalization 13/CONS/MMMAUMP/22. / En Component 4: Project Manag Individual Consult IDA / V3740 Post Open - National 0.00 Canceled 2022-10-18 2022-12-06 2022-12-27 2023-01-31 2025-01-30 vironmental Specialist ement, Monitoring and Evalu ant Selection ation 16/CONS/MMAUMP/22 / Gen Component 4: Project Manag Individual Consult Under Implement IDA / V3740 Post Open - National 0.00 2022-11-21 2022-11-22 2023-01-09 2023-01-30 2023-03-06 2025-03-17 der Based Violence, ement, Monitoring and Evalu ant Selection ation ation 17/CONS/MMAUMP/23 / Envir Component 4: Project Manag IDA / V3740 Post Direct Selection Direct - National 0.00 Signed 2023-02-15 2023-03-06 2023-02-25 2023-03-15 2023-05-01 2025-04-30 onmental Specialist ement, Monitoring and Evalu ation 22/CONS/MMAUMP/23 / Proje Component 4: Project Manag Individual Consult Under Implement IDA / V3740 Post Open - National 0.00 2023-04-28 2023-05-23 2023-06-16 2023-07-07 2023-08-11 2025-08-10 ct Accountant ement, Monitoring and Evalu ant Selection ation ation Component 1: Urban Transp MZ-MTC-300499-CS-INDV / I ort Institutional and Regulat Individual Consult IDA / V3740 Post Open 0.00 Canceled 2022-11-15 2022-07-08 2023-01-03 2023-01-24 2023-02-28 2023-08-27 T Specialist ory Strengthening and Publi ant Selection c Transport Industry Professi onalization Component 1: Urban Transp MZ-MTC-301618-CS-INDV / F ort Institutional and Regulat Individual Consult IDA / V3740 Post Open 0.00 Canceled 2022-07-15 2022-07-12 2022-09-02 2022-09-23 2022-10-28 2023-04-26 inancial Manager Junior ory Strengthening and Publi ant Selection c Transport Industry Professi onalization 25/CONS/MMAUP/23 / Devel Component 4: Project Manag Individual Consult Pending Impleme op technical standards for bu IDA / V3740 ement, Monitoring and Evalu Post Open - National 0.00 2023-06-20 2023-08-08 2023-08-29 2023-10-03 2024-03-31 ant Selection ntation s stops within AMM ation 28/CONS/MMUAP/23 / Projec Component 4: Project Manag Individual Consult Under Implement IDA / V3740 Post Open - National 0.00 2023-05-10 2023-06-22 2023-06-28 2023-07-19 2023-08-23 2025-08-22 t Community Engagement Of ement, Monitoring and Evalu ant Selection ation ficer ation Page 4 Component 1: Urban Transp 01/CONS/MMAUMP/22 / Instit ort Institutional and Regulat Individual Consult utional and Implementation IDA / V3740 Post Open - National 0.00 Canceled 2022-07-11 2022-11-15 2022-09-11 2022-10-02 2022-11-30 2024-11-30 ory Strengthening and Publi ant Selection Advisor c Transport Industry Professi onalization 28/CONS/MMAUP/23 / Imple Component 4: Project Manag Individual Consult Under Implement IDA / V3740 Post Open - National 0.00 2023-05-30 2023-05-23 2023-07-18 2023-08-08 2023-09-12 2025-09-11 mentation Advisor ement, Monitoring and Evalu ant Selection ation ation 26/CONS/MMAUP/23 / Carry out an assessment of Famba Component 5: Contingency Individual Consult Under Implement as the e-ticketing solution for IDA / V3740 Post Open - National 0.00 2023-06-20 2023-06-22 2023-08-08 2023-08-29 2023-10-03 2024-03-31 and Emergency Response ant Selection ation AMM and characterize and co mpare options for cashless ( mobile) payment schemes. 27/CONS/MMAUP/23 / Projec Component 4: Project Manag Individual Consult Under Implement IDA / V3740 Post Limited 0.00 2023-06-15 2023-06-01 2023-06-20 2023-07-11 2023-08-15 2025-08-14 t Civil Engineer ement, Monitoring and Evalu ant Selection ation ation Page 5 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: March 17, 2017 2. Date of General Procurement Notice: May 4, 2015 3. Period covered by this procurement plan: March 2017 to Feb 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 15 Moderate risk installation of plant and equipment and PPP) 2. (Goods; Information Technology & 4 Moderate risk Non-Consulting Services) 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual 0.4 Moderate risk Consultants) 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements: NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. March 17, 2017 9. Renewal or extension of individual consultants contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. March 17, 2017 PROCUREMENT Eastern and Southern Africa : EA Regional Transport , Trade and Development Facilitation Project (Second Phase of Program) PLAN General Information Country: Eastern and Southern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-08-14 Revised Plan Date(s): (comma delineated, leave blank if 2023-05-22 none) Project ID: P148853 GPN Date: Project Name: EA Regional Transport , Trade and Development Facilitation Project (Second Phase of Program) Loan / Credit No: IDA / 56380 Ministry of Transport and Infrastructure Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-361128-CW-DIR / R National Proc efurbishment of 9th floor Boa urement Doc rdroom, Works Building into Component 3: Institutional D ument - 1 En Pending Imp 2023-12-0 a Smart Conference Room an IDA / 56380 evelopment and Program Ma Post Direct Selection Direct - National 0.00 2023-05-11 2023-05-16 2023-06-06 velope proce lementation 3 d Renovation of offices and t nagement ss (Non Bank oilets in Lower ground, 4th, 5 -SPD) th and 6th floors in Transcom House GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-11649-GO-DIR / Pro Component 2: Facilitation of curement of Three Toyota Pr IDA / 56380 Regional Transport, Trade a Prior Direct Selection Direct 0.00 Canceled 2017-05-10 2017-05-15 2017-06-19 2017-12-16 ados KDJI50R grey VXL auto nd Development matic with sequential shifting gear KE-MOTI-235049-GO-RFB / S Component 3: Institutional D Single Stage - One E DoI - Purchase of 3 No. (three IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 296,833.61 Signed 2021-05-18 2021-08-17 2021-05-23 2021-08-16 2021-07-04 2021-08-27 2021-08-03 2021-10-04 2021-09-07 2022-01-22 2022-03-06 nvelope ) heavy utility (4*4) SUV mot nagement or vehicles KE-MOTI-293766-GO-RFB / K ETRB: SUPPLY AND DELIVERY Component 3: Institutional D Single Stage - One E Under Imple OF TWO (2) NO. MOTOR VEHI IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2022-06-30 2022-11-08 2022-07-05 2022-11-08 2022-08-16 2022-09-15 2022-10-20 2023-04-18 nvelope mentation CLES nagement (a). 1 No. SUV motor vehicles (b). 1 No. Double Cabin Picku pKE-MOTI-293776-GO-RFQ / K ETRB: Supply and Delivery of i)Executive Chair 1No.(ii)Offic e Table 1No.(iii)Conference T Component 3: Institutional D Request for Quota Single Stage - One E Under Imple able 12 seater 1No.(iv)Confer IDA / 56380 evelopment and Program Ma Post Limited 0.00 2022-07-23 2022-08-30 2022-09-17 2023-03-16 tions nvelope mentation ence Chairs 12No.(v)Work st nagement ation 4Way 1No.(v)Chairs 15 No.(vi)Visitors Chairs 8No.(vii )Sofa Set 3 seater 2No. (viii)F ireproof cabinet 2No KE-MOTI-322277-GO-RFB / K ETRB: Supply, installation an Component 3: Institutional D d commissioning of Enterpris Single Stage - One E Under Imple IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2022-10-31 2023-04-04 2022-11-05 2023-04-04 2022-12-17 2023-01-16 2023-02-20 2023-07-31 e Resource Planning (ERP) Sy nvelope mentation nagement stem with Four (4) Key Modul es; Registration, Finance, Pro curement and Inventory) KE-MOTI-322015-GO-RFQ / K ETRB: Supply and Delivery of ICT Equipment (i) Desktop Co mputers 14No. (ii) Laptop Co Component 3: Institutional D Request for Quota Single Stage - One E Pending Impl mputers 6No. (iii) Medium Pri IDA / 56380 evelopment and Program Ma Post Limited 0.00 2022-12-14 2023-02-08 2023-05-09 tions nvelope ementation nter 3No. (iv) Heavy Duty Pri nagement nter 1No. (v) Tablet Compute rs (a) Type A 2No. (b) Type B 2No. (vi) Uninterruptible Pow er Supply (UPS) 14No. KE-MOTI-321786-GO-RFB / R OADS: SUPPLY, DELIVERY AN D INSTALLATION OF AUTODE Component 3: Institutional D SK ARCHITECTURE, ENGINEE Single Stage - One E Under Imple IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2022-10-31 2023-04-04 2022-12-13 2023-04-04 2023-01-12 2023-02-11 2023-03-18 2023-07-16 RING AND CONSTRUCTION C nvelope mentation nagement OLLECTION (ROADS, BRIDGE S AND DRAINAGE) SOFTWAR E AND TRAINING WITH THRE E (3) YEARS LICENSE KE-MOTI-321784-CW-RFB / R OADS: Supply, Delivery and I Component 3: Institutional D nstallation of assorted office Single Stage - One E Pending Impl IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2023-05-11 2023-05-19 2023-06-02 2023-06-17 2023-07-08 2023-10-06 furniture to 9th Floor Boardro nvelope ementation nagement om, Works Building and offic es in Lower ground, 4th, 5th and 6th floors in Transcom H ouse. KE-MOTI-321788-GO-RFB / R Component 3: Institutional D OADS: Supply and Delivery o Request for Quota Single Stage - One E Pending Impl IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-23 2023-07-18 2023-10-16 f 2No. Portable weigh in moti tions nvelope ementation nagement on (WIM) for Roads Division KE-MOTI-361133-GO-RFQ / S upply and Delivery of 1 No. F Component 3: Institutional D Request for Quota Single Stage - One E Pending Impl alling Weight Deflectometer IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-23 2023-07-18 2023-10-16 tions nvelope ementation and 1 No. Air Quality Meter ( nagement Outdoor Ambient Air Quality Monitor) KE-MOTI-361140-GO-RFB / S Component 3: Institutional D Single Stage - One E Pending Impl upply and Delivery of office f IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2023-05-18 2023-05-23 2023-06-06 2023-06-20 2023-07-11 2023-10-09 nvelope ementation urniture to KETRB offices nagement KE-MOTI-361143-GO-RFQ / K ISM: Supply ,Installation and Commissioning of livestreami Component 3: Institutional D ng modules: TOUCH SCREEN Request for Quota Single Stage - One E Under Imple IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-23 2023-07-11 2023-10-09 DISPLAY 4 no. ALL-IN-ONE VI tions nvelope mentation nagement DEO CONFERENCING DEVICE 2no. CAMERA 2.no SMART IP CON FERENCE PHONES 2no. Page 1 KE-MOTI-361142-GO-RFQ / K ISM: Supply, delivery, installa Component 3: Institutional D Request for Quota Single Stage - One E Under Imple tion and commissioning of: L IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-23 2023-07-11 2023-10-09 tions nvelope mentation APTOPS 25 No. nagement DESKTOPS 20 No. SERVER 2 No. KE-MOTI-361163-GO-DIR / D Component 3: Institutional D esign, Installation and Comm Under Imple IDA / 56380 evelopment and Program Ma Post Direct Selection Direct - National 0.00 2023-05-23 2023-06-06 2023-05-28 2023-07-02 2023-09-30 issioning of Enterprise Resou mentation nagement rces Planning (ERP) Program me for KISM NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-362669-NC-RFQ / D Component 3: Institutional D Request for Quota Single Stage - One E Under Imple esign, development and com IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-31 2023-07-26 2023-10-31 tions nvelope mentation missioning of KISM Website nagement CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-21175-CS-QCBS / C Component 2: Facilitation of Quality And Cost- ONSULTANCY SERVICES FOR IDA / 56380 Regional Transport, Trade a Prior Open - National 0.00 Canceled 2017-11-01 2017-08-17 2017-11-22 2018-01-05 2017-11-15 2018-02-02 2017-12-22 2018-03-04 2021-03-24 2018-04-08 2018-05-13 2023-05-13 Based Selection MONITORING AND EVALUATI nd Development ON KE-MOTI-276766-CS-QCBS / NTSA: CONSULTANCY SERVIC Component 3: Institutional D Quality And Cost- E TO CONDUCT A FINANCIAL IDA / 56380 evelopment and Program Ma Post Open - National 0.00 Canceled 2022-02-06 2022-06-06 2022-02-27 2022-05-17 2022-04-12 2022-05-10 2022-06-09 2022-07-14 2022-08-18 2023-08-18 Based Selection SUSTAINABILITY STUDY FOR nagement NATIONAL TRANSPORT AND SAFETY AUTHORITY KE-MOTI-276770-CS-QCBS / Component 3: Institutional D EBK: Consultancy services fo Quality And Cost- IDA / 56380 evelopment and Program Ma Post Open - National 0.00 Canceled 2022-02-06 2022-06-22 2022-02-27 2022-05-17 2022-04-12 2022-05-10 2022-06-09 2022-07-14 2022-08-18 2023-08-18 r the Financial Sustainability Based Selection nagement Study for Engineers Board Of Kenya (EBK) KE-MOTI-301628-CS-QCBS / Component 3: Institutional D EBK: Consultancy services fo Quality And Cost- Open - Internationa Under Implement IDA / 56380 evelopment and Program Ma Post 0.00 2022-07-03 2022-07-19 2022-07-24 2022-08-30 2022-09-06 2022-10-11 2022-10-04 2022-11-03 2022-12-08 2023-01-12 2024-01-12 r the Financial Sustainability Based Selection l ation nagement Study for Engineers Board of Kenya KE-MOTI-301621-CS-QCBS / NTSA: Consultancy Services t Component 3: Institutional D Quality And Cost- Open - Internationa Under Implement o conduct a Financial Sustain IDA / 56380 evelopment and Program Ma Post 0.00 2022-07-03 2022-07-19 2022-07-24 2022-08-30 2022-09-06 2022-10-11 2022-10-04 2022-11-03 2022-12-08 2023-01-12 2024-01-12 Based Selection l ation ability Study for National Tra nagement nsport and Safety Authority KE-MOTI-306797-CS-QCBS / KETRB: Consultancy Service t Component 3: Institutional D o Conduct National Baseline Quality And Cost- Pending Impleme IDA / 56380 evelopment and Program Ma Post Open - National 0.00 2022-08-05 2022-08-26 2022-10-09 2022-11-06 2022-12-06 2023-01-10 2023-02-14 2024-02-14 Survey on the ratio of Engine Based Selection ntation nagement ers to Engineering technologi sts, Technicians to Craft Pers ons in Training and Employm ent KE-MOTI-303040-CS-QCBS / ROADS: CONSULTANCY SERV Component 3: Institutional D Quality And Cost- Under Implement ICES ON DEVELOPMENT OF P IDA / 56380 evelopment and Program Ma Post Open - National 0.00 2022-08-29 2023-01-25 2022-09-19 2022-11-02 2022-11-30 2022-12-30 2023-02-03 2023-03-10 2024-03-09 Based Selection ation OLICY ON ACCOMMODATION nagement OF UTILITIES WITHIN ROAD R ESERVES KE-MOTI-303042-CS-QCBS / KETRB: Consultancy services Component 3: Institutional D Quality And Cost- to Conduct a Financial Sustai IDA / 56380 evelopment and Program Ma Post Open - National 0.00 Canceled 2022-07-11 2022-12-05 2022-08-01 2022-09-14 2022-10-12 2022-11-11 2022-12-16 2023-01-20 2024-01-20 Based Selection nability Study for Kenya Engi nagement neering Technology Registrat ion Board (KETRB) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: March 17, 2017 2. Date of General Procurement Notice: May 4, 2015 3. Period covered by this procurement plan: March 2017 to Feb 2018 II. Goods, Works, Consultant and Non-Consulting Services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Type of Procurement Prior Review Comments Threshold (PRT) US$ (Millions) 1. Works (Including turnkey, supply & 15 Moderate risk installation of plant and equipment and PPP) 2. (Goods; Information Technology & 4 Moderate risk Non-Consulting Services) 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual 0.4 Moderate risk Consultants) 2. Prequalification. NA 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: NA 4. Reference to (if any) Project Operational/Procurement Manual: Available in Project files 5. Any Other Special Procurement Arrangements: NA 6. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 7. All TORs for the procurement of consultants services irrespective of the estimated cost of the assignment shall be reviewed and cleared by the TTL 8. Operating expenditures are neither subject to the Procurement and Consultant Guidelines nor prior or post reviews. Operating expenditures are normally verified by TTLs and FM specialists and obtained using the Borrower’s national procurement and administrative procedures. March 17, 2017 9. Renewal or extension of individual consultants contracts hired for technical assistance and which are intended for a long-term period but signed for an initial period shorter than the duration of the project, and that have been prior reviewed, do not require procurement clearance if there is no substantial change in the terms and conditions of the contract. March 17, 2017 PROCUREMENT Eastern and Southern Africa : EA Regional Transport , Trade and Development Facilitation Project (Second Phase of Program) PLAN General Information Country: Eastern and Southern Africa Bank’s Approval Date of the Original Procurement Plan: 2017-08-14 Revised Plan Date(s): (comma delineated, leave blank if 2023-05-22 none) Project ID: P148853 GPN Date: Project Name: EA Regional Transport , Trade and Development Facilitation Project (Second Phase of Program) Loan / Credit No: IDA / 56380 Ministry of Transport and Infrastructure Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-361128-CW-DIR / R National Proc efurbishment of 9th floor Boa urement Doc rdroom, Works Building into Component 3: Institutional D ument - 1 En Pending Imp 2023-12-0 a Smart Conference Room an IDA / 56380 evelopment and Program Ma Post Direct Selection Direct - National 0.00 2023-05-11 2023-05-16 2023-06-06 velope proce lementation 3 d Renovation of offices and t nagement ss (Non Bank oilets in Lower ground, 4th, 5 -SPD) th and 6th floors in Transcom House GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-11649-GO-DIR / Pro Component 2: Facilitation of curement of Three Toyota Pr IDA / 56380 Regional Transport, Trade a Prior Direct Selection Direct 0.00 Canceled 2017-05-10 2017-05-15 2017-06-19 2017-12-16 ados KDJI50R grey VXL auto nd Development matic with sequential shifting gear KE-MOTI-235049-GO-RFB / S Component 3: Institutional D Single Stage - One E DoI - Purchase of 3 No. (three IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 296,833.61 Signed 2021-05-18 2021-08-17 2021-05-23 2021-08-16 2021-07-04 2021-08-27 2021-08-03 2021-10-04 2021-09-07 2022-01-22 2022-03-06 nvelope ) heavy utility (4*4) SUV mot nagement or vehicles KE-MOTI-293766-GO-RFB / K ETRB: SUPPLY AND DELIVERY Component 3: Institutional D Single Stage - One E Under Imple OF TWO (2) NO. MOTOR VEHI IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2022-06-30 2022-11-08 2022-07-05 2022-11-08 2022-08-16 2022-09-15 2022-10-20 2023-04-18 nvelope mentation CLES nagement (a). 1 No. SUV motor vehicles (b). 1 No. Double Cabin Picku pKE-MOTI-293776-GO-RFQ / K ETRB: Supply and Delivery of i)Executive Chair 1No.(ii)Offic e Table 1No.(iii)Conference T Component 3: Institutional D Request for Quota Single Stage - One E Under Imple able 12 seater 1No.(iv)Confer IDA / 56380 evelopment and Program Ma Post Limited 0.00 2022-07-23 2022-08-30 2022-09-17 2023-03-16 tions nvelope mentation ence Chairs 12No.(v)Work st nagement ation 4Way 1No.(v)Chairs 15 No.(vi)Visitors Chairs 8No.(vii )Sofa Set 3 seater 2No. (viii)F ireproof cabinet 2No KE-MOTI-322277-GO-RFB / K ETRB: Supply, installation an Component 3: Institutional D d commissioning of Enterpris Single Stage - One E Under Imple IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2022-10-31 2023-04-04 2022-11-05 2023-04-04 2022-12-17 2023-01-16 2023-02-20 2023-07-31 e Resource Planning (ERP) Sy nvelope mentation nagement stem with Four (4) Key Modul es; Registration, Finance, Pro curement and Inventory) KE-MOTI-322015-GO-RFQ / K ETRB: Supply and Delivery of ICT Equipment (i) Desktop Co mputers 14No. (ii) Laptop Co Component 3: Institutional D Request for Quota Single Stage - One E Pending Impl mputers 6No. (iii) Medium Pri IDA / 56380 evelopment and Program Ma Post Limited 0.00 2022-12-14 2023-02-08 2023-05-09 tions nvelope ementation nter 3No. (iv) Heavy Duty Pri nagement nter 1No. (v) Tablet Compute rs (a) Type A 2No. (b) Type B 2No. (vi) Uninterruptible Pow er Supply (UPS) 14No. KE-MOTI-321786-GO-RFB / R OADS: SUPPLY, DELIVERY AN D INSTALLATION OF AUTODE Component 3: Institutional D SK ARCHITECTURE, ENGINEE Single Stage - One E Under Imple IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2022-10-31 2023-04-04 2022-12-13 2023-04-04 2023-01-12 2023-02-11 2023-03-18 2023-07-16 RING AND CONSTRUCTION C nvelope mentation nagement OLLECTION (ROADS, BRIDGE S AND DRAINAGE) SOFTWAR E AND TRAINING WITH THRE E (3) YEARS LICENSE KE-MOTI-321784-CW-RFB / R OADS: Supply, Delivery and I Component 3: Institutional D nstallation of assorted office Single Stage - One E Pending Impl IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2023-05-11 2023-05-19 2023-06-02 2023-06-17 2023-07-08 2023-10-06 furniture to 9th Floor Boardro nvelope ementation nagement om, Works Building and offic es in Lower ground, 4th, 5th and 6th floors in Transcom H ouse. KE-MOTI-321788-GO-RFB / R Component 3: Institutional D OADS: Supply and Delivery o Request for Quota Single Stage - One E Pending Impl IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-23 2023-07-18 2023-10-16 f 2No. Portable weigh in moti tions nvelope ementation nagement on (WIM) for Roads Division KE-MOTI-361133-GO-RFQ / S upply and Delivery of 1 No. F Component 3: Institutional D Request for Quota Single Stage - One E Pending Impl alling Weight Deflectometer IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-23 2023-07-18 2023-10-16 tions nvelope ementation and 1 No. Air Quality Meter ( nagement Outdoor Ambient Air Quality Monitor) KE-MOTI-361140-GO-RFB / S Component 3: Institutional D Single Stage - One E Pending Impl upply and Delivery of office f IDA / 56380 evelopment and Program Ma Post Request for Bids Open - National 0.00 2023-05-18 2023-05-23 2023-06-06 2023-06-20 2023-07-11 2023-10-09 nvelope ementation urniture to KETRB offices nagement KE-MOTI-361143-GO-RFQ / K ISM: Supply ,Installation and Commissioning of livestreami Component 3: Institutional D ng modules: TOUCH SCREEN Request for Quota Single Stage - One E Under Imple IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-23 2023-07-11 2023-10-09 DISPLAY 4 no. ALL-IN-ONE VI tions nvelope mentation nagement DEO CONFERENCING DEVICE 2no. CAMERA 2.no SMART IP CON FERENCE PHONES 2no. Page 1 KE-MOTI-361142-GO-RFQ / K ISM: Supply, delivery, installa Component 3: Institutional D Request for Quota Single Stage - One E Under Imple tion and commissioning of: L IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-23 2023-07-11 2023-10-09 tions nvelope mentation APTOPS 25 No. nagement DESKTOPS 20 No. SERVER 2 No. KE-MOTI-361163-GO-DIR / D Component 3: Institutional D esign, Installation and Comm Under Imple IDA / 56380 evelopment and Program Ma Post Direct Selection Direct - National 0.00 2023-05-23 2023-06-06 2023-05-28 2023-07-02 2023-09-30 issioning of Enterprise Resou mentation nagement rces Planning (ERP) Program me for KISM NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-362669-NC-RFQ / D Component 3: Institutional D Request for Quota Single Stage - One E Under Imple esign, development and com IDA / 56380 evelopment and Program Ma Post Limited 0.00 2023-05-31 2023-07-26 2023-10-31 tions nvelope mentation missioning of KISM Website nagement CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOTI-21175-CS-QCBS / C Component 2: Facilitation of Quality And Cost- ONSULTANCY SERVICES FOR IDA / 56380 Regional Transport, Trade a Prior Open - National 0.00 Canceled 2017-11-01 2017-08-17 2017-11-22 2018-01-05 2017-11-15 2018-02-02 2017-12-22 2018-03-04 2021-03-24 2018-04-08 2018-05-13 2023-05-13 Based Selection MONITORING AND EVALUATI nd Development ON KE-MOTI-276766-CS-QCBS / NTSA: CONSULTANCY SERVIC Component 3: Institutional D Quality And Cost- E TO CONDUCT A FINANCIAL IDA / 56380 evelopment and Program Ma Post Open - National 0.00 Canceled 2022-02-06 2022-06-06 2022-02-27 2022-05-17 2022-04-12 2022-05-10 2022-06-09 2022-07-14 2022-08-18 2023-08-18 Based Selection SUSTAINABILITY STUDY FOR nagement NATIONAL TRANSPORT AND SAFETY AUTHORITY KE-MOTI-276770-CS-QCBS / Component 3: Institutional D EBK: Consultancy services fo Quality And Cost- IDA / 56380 evelopment and Program Ma Post Open - National 0.00 Canceled 2022-02-06 2022-06-22 2022-02-27 2022-05-17 2022-04-12 2022-05-10 2022-06-09 2022-07-14 2022-08-18 2023-08-18 r the Financial Sustainability Based Selection nagement Study for Engineers Board Of Kenya (EBK) KE-MOTI-301628-CS-QCBS / Component 3: Institutional D EBK: Consultancy services fo Quality And Cost- Open - Internationa Under Implement IDA / 56380 evelopment and Program Ma Post 0.00 2022-07-03 2022-07-19 2022-07-24 2022-08-30 2022-09-06 2022-10-11 2022-10-04 2022-11-03 2022-12-08 2023-01-12 2024-01-12 r the Financial Sustainability Based Selection l ation nagement Study for Engineers Board of Kenya KE-MOTI-301621-CS-QCBS / NTSA: Consultancy Services t Component 3: Institutional D Quality And Cost- Open - Internationa Under Implement o conduct a Financial Sustain IDA / 56380 evelopment and Program Ma Post 0.00 2022-07-03 2022-07-19 2022-07-24 2022-08-30 2022-09-06 2022-10-11 2022-10-04 2022-11-03 2022-12-08 2023-01-12 2024-01-12 Based Selection l ation ability Study for National Tra nagement nsport and Safety Authority KE-MOTI-306797-CS-QCBS / KETRB: Consultancy Service t Component 3: Institutional D o Conduct National Baseline Quality And Cost- Pending Impleme IDA / 56380 evelopment and Program Ma Post Open - National 0.00 2022-08-05 2022-08-26 2022-10-09 2022-11-06 2022-12-06 2023-01-10 2023-02-14 2024-02-14 Survey on the ratio of Engine Based Selection ntation nagement ers to Engineering technologi sts, Technicians to Craft Pers ons in Training and Employm ent KE-MOTI-303040-CS-QCBS / ROADS: CONSULTANCY SERV Component 3: Institutional D Quality And Cost- Under Implement ICES ON DEVELOPMENT OF P IDA / 56380 evelopment and Program Ma Post Open - National 0.00 2022-08-29 2023-01-25 2022-09-19 2022-11-02 2022-11-30 2022-12-30 2023-02-03 2023-03-10 2024-03-09 Based Selection ation OLICY ON ACCOMMODATION nagement OF UTILITIES WITHIN ROAD R ESERVES KE-MOTI-303042-CS-QCBS / KETRB: Consultancy services Component 3: Institutional D Quality And Cost- to Conduct a Financial Sustai IDA / 56380 evelopment and Program Ma Post Open - National 0.00 Canceled 2022-07-11 2022-12-05 2022-08-01 2022-09-14 2022-10-12 2022-11-11 2022-12-16 2023-01-20 2024-01-20 Based Selection nability Study for Kenya Engi nagement neering Technology Registrat ion Board (KETRB) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 PROCUREMENT PLAN TEXTUAL PART Project information Country : Turkey Project Name : Turkey Resilient Landscape Integration Project (TULIP) Project Number : P172562 Project Implementation Agency: Directorate General of Forestry (OGM), General Directorate of Agricultural Reform (TRGM), State Hydraulic Works (DSI), General Directorate of Highways (KGM) Date of the Procurement Plan: May 03, 2021 Period covered by this Procurement Plan: From July 2021 to December 2022 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. Any procurement activity under the Project shall not be initiated before it is approved by the Bank through STEP. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Goods, Works and Non-consulting Services Procurement Procurement Method Prior Review Threshold Method Threshold RFB Default Method for Good, Works Contract valued > USD (International and Non-consulting Services (No 10M Works and > USD 2M Open selection method threshold) for Goods and Non- Competition) Consulting Services 1 RFB (National Contracts valued < USD 30M for Contracts valued > USD Open Works and < USD 2M for Goods 10M for Works and > USD Competition) and Non-Consulting Services 2M for Goods and Non- Consulting Services RFQ Works Contracts valued < No prior review USD200,000 – Goods and Non- consulting Services Contracts valued < USD100,000 Works III. Selection of Consultants Selection Method Selection Method Prior Review Threshold Threshold Quality and Cost Default Method (No Contract valued ≥ USD Based Selection selection method 1M (QCBS) threshold) Selection Based on Contracts valued < No prior review Consultants USD300,000 Qualification (CQS) Least Cost Selection No selection Method Contract valued ≥ USD (LCS) threshold 1M Direct Selection (DIR) No selection method Contract valued ≥ USD threshold 1M Justification is required at the PP approval Individual Consultants No selection method Contracts valued ≥ (INDV) threshold USD300,000 The terms of references of any audit, procurement or legal consultants financed by the project shall be sent to the Bank for its comments. IV. Special Arrangements 1.The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. For the procurements not subject to international competitive selection, Turkish translation of the Bank’s Standard Procurement Documents (SPD) with minor modifications will be used as to fit for purpose or the procurement documents agreed by the Bank shall be used. 2.Review Procedure: The procurements under the project are subject to the Bank’s prior review as stipulated in above Paragraphs II and III and also as specified in the procurement schedule given below in Section V, and in STEP. 3.Procurement of Second Hand Goods: Not Applicable 2 4.Domestic preference (as specified under paragraph 5.51 of the Procurement Regulations): Not applicable 5.Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable 6. Other Relevant Procurement Information - NA 7. Procurement Packages with Methods and Time Schedule The estimated costs given in the attached tables include VAT. 3 PROCUREMENT Turkiye : Turkey Resilient Landscape Integration Project (TULIP) PLAN General Information Country: Turkiye 2022-02-11 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172562 GPN Date: 2021-12-09 Project Name: Turkey Resilient Landscape Integration Project (TULIP) Loan / Credit No: IBRD / 92720 Cekerek Regional Support Team Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Bids - TR-CEKEREK RST-299282-C Component 1: Investments i Single Stage - One E Small Works SPD 2022-12-3 W-RFB / Construction of Ceke IBRD / 92720 n Resilient Landscape Integr Post Request for Bids Open - National 800,000.00 875,174.44 Completed 2022-06-27 2022-07-20 2022-06-28 2022-07-28 2022-08-22 2022-07-30 2022-08-22 2022-08-10 2022-09-19 nvelope (1 envelope proce 1 rek Recreation Area ation in targeted areas ss) TR-CEKEREK RST-307656-C Component 1: Investments i Request for Quota Single Stage - One E Other (with field f 2022-12-3 W-RFQ / Sivas Forest Nursery IBRD / 92720 n Resilient Landscape Integr Post Open - National 59,000.00 0.00 Canceled 2022-09-11 2022-09-30 tions nvelope or explanation) 1 Directorate Road Constructio ation in targeted areas n Work TR-CEKEREK RST-307971-C W-RFQ / Sivas Forest Manage Component 1: Investments i ment Directorate Animal Can Request for Quota Single Stage - One E Other (with field f 2022-12-3 IBRD / 92720 n Resilient Landscape Integr Post Open - National 7,000.00 0.00 Canceled 2022-09-11 2022-09-30 opy Construction Work tions nvelope or explanation) 1 ation in targeted areas (Sivas Province Yıldızeli Distr ict Subasi Village) TR-CEKEREK RST-311277-C W-RFQ / Kayseri Forest Regio nal Directorate Yozgat Forest Component 1: Investments i Request for Quota Single Stage - One E Other (with field f 2022-12-3 Management Directorate Con IBRD / 92720 n Resilient Landscape Integr Post Open - National 18,000.00 0.00 Canceled 2022-08-31 2022-09-27 tions nvelope or explanation) 1 struction of scratching post, ation in targeted areas plaster and salt shaker for an imals within the scope of pas ture improvement. TR-CEKEREK RST-307969-C W-RFQ / Service Road Constr uction, Planting Services, Lan d Preparation Works (Sivas, Y Component 1: Investments i Request for Quota Single Stage - One E Other (with field f 2022-12-3 ıldızeli District Sarıcal Village IBRD / 92720 n Resilient Landscape Integr Post Open - National 22,500.00 0.00 Canceled 2022-09-11 2022-09-30 tions nvelope or explanation) 1 Eğrek Locality) ation in targeted areas (Although it has similar busin ess status with 307963-CW-R FQ, its field location and loca tions are very different regio ns.) TR-CEKEREK RST-307963-C W-RFQ / Service Road Constr uction, Planting Services, Lan d Preparation Works,(Sivas, Y Component 1: Investments i Request for Quota Single Stage - One E Other (with field f 2022-12-3 ıldızeli District Üyükyaylası Vi IBRD / 92720 n Resilient Landscape Integr Post Open - National 101,000.00 0.00 Canceled 2022-09-11 2022-09-30 tions nvelope or explanation) 1 llage Karababa Locality) ation in targeted areas (Although it has similar busin ess status to 307969-CW-RF Q, its field location and locati ons are very different region s.) TR-CEKEREK RST-315304-C W-RFQ / Sapling Planting Ser Component 1: Investments i vices, Land Preparation servi Request for Quota Single Stage - One E Other (with field f 2022-12-3 IBRD / 92720 n Resilient Landscape Integr Post Open - National 80,000.00 0.00 Canceled 2022-09-21 2022-11-01 ce procurement business (Siv tions nvelope or explanation) 1 ation in targeted areas as Yıldızeli District Üyükyayla sı Village Karababa Locality) TR-CEKEREK RST-315305-C W-RFQ / Sapling Planting Ser Component 1: Investments i Request for Quota Single Stage - One E Other (with field f 2022-12-3 vices, Land Preparation servi IBRD / 92720 n Resilient Landscape Integr Post Open - National 22,500.00 0.00 Canceled 2022-09-21 2022-11-01 tions nvelope or explanation) 1 ce procurement business (Siv ation in targeted areas as Yıldızeli District Sarıcal Vill age Eğrek Locality) TR-CEKEREK RST-351012-C Component 1: Investments i W-RFQ / Recreation Construc Request for Quota Single Stage - One E Other (with field f 2023-09-2 IBRD / 92720 n Resilient Landscape Integr Post Open - National 72,000.00 0.00 Canceled 2023-03-31 2023-05-26 tion Area (Wooden railing, Pa tions nvelope or explanation) 3 ation in targeted areas nel fence, Manhole and Sign Construction work.) TR-CEKEREK RST-354418-C W-RFQ / Amasya OBM Corum Forest Management Director Component 1: Investments i Request for Quota Single Stage - One E Other (with field f Pending Imp 2023-08-2 ate. Construction works withi IBRD / 92720 n Resilient Landscape Integr Post Open - National 116,000.00 0.00 2023-04-15 2023-05-26 tions nvelope or explanation) lementation 4 n the scope of afforestation a ation in targeted areas nd soil conservation works.(S oil tillage, sapling planting, b arbed wire construction work s.) TR-CEKEREK RST-362170-C Request for Bids - W-RFB / Recreation Construct Component 1: Investments i Single Stage - One E Small Works SPD Under Imple 2023-12-3 ion Area. (Country Coffee, W IBRD / 92720 n Resilient Landscape Integr Post Request for Bids Open - National 304,000.00 0.00 2023-05-26 2023-06-09 2023-05-31 2023-07-12 2023-07-17 2023-08-01 nvelope (1 envelope proce mentation 1 ooden Railing, Panel Fence, ation in targeted areas ss) Manhole Construction work.) TR-CEKEREK RST-362381-C W-RFQ / Kayseri OBM Sivas F orest Management Directorat e. Construction works within Component 1: Investments i Request for Quota Single Stage - One E Other (with field f Under Imple 2023-12-3 the scope of afforestation an IBRD / 92720 n Resilient Landscape Integr Post Open - National 152,000.00 0.00 2023-06-25 2023-07-14 tions nvelope or explanation) mentation 1 d soil conservation works. (S ation in targeted areas oil tillage, sapling planting, b arbed wire construction work s.) (Sivas Province Yildizeli Di strict Üyükyaylasi Village.) TR-CEKEREK RST-362383-C W-RFQ / Kayseri OBM Sivas F orest Management Directorat Component 1: Investments i Request for Quota Single Stage - One E Other (with field f Under Imple 2023-12-3 e (Construction works within IBRD / 92720 n Resilient Landscape Integr Post Open - National 90,000.00 0.00 2023-06-25 2023-07-14 tions nvelope or explanation) mentation 1 the scope of afforestation an ation in targeted areas d rehabilitation works.) (Sivas Province Yildizeli Distri ct Sarıcal village location.) TR-CEKEREK RST-307971-C Component 1: Investments i W-RFQ-2 / Kayseri OBM Sivas Request for Quota Single Stage - One E Other (with field f Under Imple 2023-12-3 IBRD / 92720 n Resilient Landscape Integr Post Open - National 11,000.00 0.00 2023-06-25 2023-07-14 Forest Management Director tions nvelope or explanation) mentation 1 ation in targeted areas ate, Animal Canopy Construc tion Work. Page 1 TR-CEKEREK RST-362505-C W-RFQ / Amasya OBM Tokat Component 1: Investments i Forest Management Director Request for Quota Single Stage - One E Other (with field f Under Imple 2023-12-3 IBRD / 92720 n Resilient Landscape Integr Post Open - National 10,000.00 0.00 2023-06-25 2023-07-14 ate. (Construction works with tions nvelope or explanation) mentation 1 ation in targeted areas in the scope of afforestation and pasture improvement wo rks.) TR-CEKEREK RST-362508-C W-RFQ / Amasya OBM Tokat Component 1: Investments i Forest Management Director Request for Quota Single Stage - One E Other (with field f Under Imple 2023-12-3 IBRD / 92720 n Resilient Landscape Integr Post Open - National 30,000.00 0.00 2023-06-25 2023-07-14 ate. (Construction works with tions nvelope or explanation) mentation 1 ation in targeted areas in the scope of afforestation) (Tokat Province Artova Distri ct Bebekderesi Village Locati on.) TR-CEKEREK RST-362514-C W-RFQ / Amasya OBM Tokat Component 1: Investments i Forest Management Director Request for Quota Single Stage - One E Other (with field f Under Imple 2023-12-3 IBRD / 92720 n Resilient Landscape Integr Post Open - National 51,000.00 0.00 2023-06-25 2023-07-14 ate. (Construction works with tions nvelope or explanation) mentation 1 ation in targeted areas in the scope of afforestation) (Tokat Province Yesilyurt Dist rict Sivri Village Location.) TR-CEKEREK RST-362515-C W-RFQ / Amasya OBM Tokat Component 1: Investments i Forest Management Director Request for Quota Single Stage - One E Other (with field f Under Imple 2023-12-3 IBRD / 92720 n Resilient Landscape Integr Post Open - National 55,000.00 0.00 2023-06-25 2023-07-14 ate.(Construction works withi tions nvelope or explanation) mentation 1 ation in targeted areas n the scope of afforestation) (Tokat Province, Yesilyurt Dis trict, Ekinli Village Location.) TR-CEKEREK RST-362517-C W-RFQ / Amasya OBM Tokat Component 1: Investments i Forest Management Director Request for Quota Single Stage - One E Other (with field f Under Imple 2023-12-3 IBRD / 92720 n Resilient Landscape Integr Post Open - National 62,000.00 0.00 2023-06-25 2023-07-14 ate.(Construction works withi tions nvelope or explanation) mentation 1 ation in targeted areas n the scope of afforestation) (Tokat Province, Artova Distri ct, Devecikargın Village Loca tion.) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TR-CEKEREK RST-307995-G Component 1: Investments i O-RFB / Yozgat Province TRG Single Stage - One E IBRD / 92720 n Resilient Landscape Integr Post Request for Bids Open - National 545,000.00 0.00 Canceled 2022-08-10 2022-08-15 2022-09-14 2022-09-16 2022-09-29 2022-12-31 M forage plant hungarian vet nvelope ation in targeted areas ch seed procurement busines s TR-CEKEREK RST-314752-G Component 1: Investments i O-RFQ / Tokat Provincial Dire Request for Quota Single Stage - One E IBRD / 92720 n Resilient Landscape Integr Post Open - National 98,500.00 0.00 Completed 2022-09-17 2022-11-12 2022-12-31 2022-12-26 ctorate of Agriculture and For tions nvelope ation in targeted areas estry Wheat Seed Goods Pur chase Business TR-CEKEREK RST-314757-G O-RFQ / Tokat Provincial Dire Component 1: Investments i Request for Quota Single Stage - One E ctorate of Agriculture and For IBRD / 92720 n Resilient Landscape Integr Post Open - National 72,000.00 0.00 Completed 2022-09-17 2022-11-12 2022-12-31 2022-12-26 tions nvelope estry Alfalfa Seed and Hunga ation in targeted areas rian Vetch Seed Procurement Business TR-CEKEREK RST-316294-G Component 1: Investments i O-RFB / Dairy Cattle Purchas Single Stage - One E IBRD / 92720 n Resilient Landscape Integr Post Request for Bids Open - National 375,000.00 0.00 Canceled 2022-09-22 2022-10-24 2022-09-27 2022-10-27 2022-11-22 2022-11-06 2022-11-26 2022-12-31 e Business Within the Scope nvelope ation in targeted areas of Development of Livestock Activities TR-CEKEREK RST-319171-G Component 1: Investments i O-RFQ / Çorum Provincial Dir Request for Quota Single Stage - One E IBRD / 92720 n Resilient Landscape Integr Post Limited 30,000.00 0.00 Completed 2022-10-14 2022-10-13 2022-11-20 2022-12-31 2022-12-17 ectorate of Agriculture and F tions nvelope ation in targeted areas orestry Hungarian Vetch See d Procurement Business TR-CEKEREK RST-319174-G Component 1: Investments i O-RFQ / Sivas Provincial Dire Request for Quota Single Stage - One E IBRD / 92720 n Resilient Landscape Integr Post Limited 87,500.00 0.00 Completed 2022-10-14 2022-11-19 2022-11-20 2022-12-31 2022-12-26 ctorate Of Agriculture and Fo tions nvelope ation in targeted areas restry Barley Seed Procurem etn Business NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TR-CEKEREK RST-332049-NC -RFB / Survey Service Procur Component 2: Institutional F Single Stage - One E ement to be Carried out in 96 IBRD / 92720 ramework, Project Managem Post Request for Bids Open - National 145,000.00 0.00 Signed 2022-12-25 2023-02-11 2022-12-30 2023-02-10 2023-03-27 2023-02-20 2023-05-02 2023-03-12 2023-08-09 nvelope Villages and 1440 Household ent, and Sustainability s for the Current Situation Su rvey CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TR-CEKEREK RST-354155-CS -CQS / Cekerek river basin fir Component 2: Institutional F Consultant Qualifi Under Implement st group micro-catchments n IBRD / 92720 ramework, Project Managem Post Open - National 230,000.00 0.00 2023-04-05 2023-05-31 2023-04-26 2023-06-09 2023-07-09 2023-07-29 2023-12-31 cation Selection ation umber six and seven. Consul ent, and Sustainability tancy Service Procurement fo r Micro-Catchment Plans TR-CEKEREK RST-354225-CS -CQS / Cekerek river basin se Component 2: Institutional F Consultant Qualifi Under Implement cond group micro-catchment IBRD / 92720 ramework, Project Managem Post Open - National 197,000.00 0.00 2023-04-05 2023-05-31 2023-04-26 2023-06-09 2023-07-09 2023-07-29 2023-12-31 cation Selection ation s number four and five. Cons ent, and Sustainability ultancy Service Procurement for Micro-Catchment Plans TR-CEKEREK RST-354227-CS -CQS / Cekerek river basin thi Component 2: Institutional F rd group micro-catchments n Consultant Qualifi Under Implement IBRD / 92720 ramework, Project Managem Post Open - National 183,000.00 0.00 2023-04-05 2023-05-31 2023-04-26 2023-06-09 2023-07-09 2023-07-29 2023-12-31 umber three and fourteen. C cation Selection ation ent, and Sustainability onsultancy Service Procurem ent for Micro-Catchment Plan s. Page 2 TR-CEKEREK RST-354231-CS -CQS / Cekerek river basin fif Component 2: Institutional F Consultant Qualifi Under Implement th group micro-catchments n IBRD / 92720 ramework, Project Managem Post Open - National 167,000.00 0.00 2023-04-05 2023-05-31 2023-04-26 2023-06-09 2023-07-09 2023-07-29 2023-12-31 cation Selection ation umber eight and nine. Consul ent, and Sustainability tancy Service Procurement fo r Micro-Catchment Plans. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TR-CEKEREK RST-278210-CS Component 2: Institutional F Individual Consult -INDV / Hiring Procurement E IBRD / 92720 ramework, Project Managem Post Open 18,000.00 11,956.90 Signed 2022-02-09 2022-03-07 2022-03-04 2022-04-26 2022-03-04 2022-04-27 2022-03-08 2022-05-26 2023-03-08 ant Selection xperts for RSTs ent, and Sustainability TR-CEKEREK RST-278220-CS Component 2: Institutional F Individual Consult -INDV / Hiring M&E Experts fo IBRD / 92720 ramework, Project Managem Post Open 18,000.00 0.00 Canceled 2022-02-09 2022-03-07 2022-03-04 2022-03-04 2022-03-08 2023-03-08 ant Selection r RSTs ent, and Sustainability TR-CEKEREK RST-278221-CS Component 2: Institutional F Individual Consult -INDV / Hiring Financial Mana IBRD / 92720 ramework, Project Managem Post Open 18,000.00 0.00 Canceled 2022-02-09 2022-03-07 2022-03-04 2022-03-04 2022-03-08 2023-03-08 ant Selection gement Experts for RSTs ent, and Sustainability TR-CEKEREK RST-278224-CS Component 2: Institutional F Individual Consult -INDV / Hiring Environmental IBRD / 92720 ramework, Project Managem Post Open 18,000.00 0.00 Canceled 2022-02-09 2022-03-07 2022-03-04 2022-05-02 2022-03-04 2022-03-08 2023-03-08 ant Selection Experts for RSTs ent, and Sustainability TR-CEKEREK RST-278225-CS Component 2: Institutional F Individual Consult -INDV / Hiring Social Experts IBRD / 92720 ramework, Project Managem Post Open 18,000.00 0.00 Canceled 2022-02-09 2022-03-07 2022-03-04 2022-03-04 2022-03-08 2023-03-08 ant Selection for RSTs ent, and Sustainability TR-CEKEREK RST-297080-CS Component 2: Institutional F Individual Consult -INDV / Recruitment of Monit IBRD / 92720 ramework, Project Managem Post Open 18,000.00 7,154.74 Signed 2022-05-26 2022-05-30 2022-06-16 2022-07-01 2022-06-18 2022-07-04 2022-06-24 2022-07-14 2022-12-31 ant Selection oring and Evaluation Speciali ent, and Sustainability st TR-CEKEREK RST-297085-CS Component 2: Institutional F Individual Consult -INDV / Recruitment of Enviro IBRD / 92720 ramework, Project Managem Post Open 18,000.00 7,144.15 Signed 2022-05-26 2022-05-30 2022-06-16 2022-06-28 2022-06-18 2022-07-04 2022-06-24 2022-07-14 2022-12-31 ant Selection nmental Specialist ent, and Sustainability TR-CEKEREK RST-297086-CS Component 2: Institutional F Individual Consult -INDV / Recruitment of Finan IBRD / 92720 ramework, Project Managem Post Open 18,000.00 1,212.67 Signed 2022-05-26 2022-05-30 2022-06-16 2022-06-27 2022-06-18 2022-07-01 2022-06-24 2022-07-11 2022-12-31 ant Selection cial Management Specialist ent, and Sustainability TR-CEKEREK RST-297087-CS Component 2: Institutional F Individual Consult -INDV / Recruitment Of Social IBRD / 92720 ramework, Project Managem Post Open 18,000.00 0.00 Canceled 2022-05-26 2022-06-27 2022-06-16 2022-06-18 2022-06-24 2022-12-31 ant Selection Development Specialist ent, and Sustainability TR-CEKEREK RST-306878-CS Component 2: Institutional F Individual Consult -INDV / Recruitment Of Social IBRD / 92720 ramework, Project Managem Post Open - National 18,000.00 0.00 Canceled 2022-08-01 2022-08-22 2022-08-22 2022-08-24 2022-08-30 2022-12-31 ant Selection Development Specialist ent, and Sustainability TR-CEKEREK RST-319168-CS Component 2: Institutional F Individual Consult -INDV / Recruitment Of Social IBRD / 92720 ramework, Project Managem Post Open - National 18,000.00 0.00 Canceled 2022-10-07 2022-10-06 2022-11-10 2022-11-28 2022-11-15 2022-11-30 2022-12-31 ant Selection Development Specialist ent, and Sustainability TR-CEKEREK RST-333645-CS Component 2: Institutional F Individual Consult -INDV / Social Safeguard Exp IBRD / 92720 ramework, Project Managem Post Open - National 18,000.00 0.00 Signed 2022-12-30 2022-12-29 2023-01-23 2023-02-20 2023-01-26 2023-02-20 2023-02-01 2023-12-31 ant Selection ert İndividual Consultant Rec ent, and Sustainability ruitment. TR-CEKEREK RST-333650-CS Component 2: Institutional F Individual Consult -INDV / Biodiversity Expert İn IBRD / 92720 ramework, Project Managem Post Open - National 18,000.00 0.00 Signed 2022-12-30 2022-12-29 2023-01-23 2023-02-17 2023-01-26 2023-02-20 2023-02-01 2023-12-31 ant Selection dividual Consultant Recruitm ent, and Sustainability ent TR-CEKEREK RST-348802-CS Component 2: Institutional F Individual Consult -INDV / Procurement Expert İ IBRD / 92720 ramework, Project Managem Post Open - National 21,600.00 0.00 Canceled 2023-03-17 2023-03-20 2023-04-12 2023-04-17 2023-04-27 2023-12-31 ant Selection ndividual Consultant Recruit ent, and Sustainability ment TR-CEKEREK RST-358348-CS Component 2: Institutional F Individual Consult Under Implement -INDV / Procurement Expert İ IBRD / 92720 ramework, Project Managem Post Open - National 21,600.00 0.00 2023-04-28 2023-05-12 2023-05-21 2023-05-21 2023-05-25 2023-12-31 ant Selection ation ndividual Consultant Recruit ent, and Sustainability ment Page 3 PROCUREMENT PLAN (Textual Part) Project information: Proyecto de Respuesta de El Salvador ante el COVID 19 - P173872 Project Implementation agency: Ministerio de Salud Date of the Procurement Plan: 27 de Enero de 2021 Period covered by this Procurement Plan: Enero 2021 – Diciembre 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT El Salvador : El Salvador COVID-19 Emergency Response Project PLAN General Information Country: El Salvador 2021-06-10 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173872 GPN Date: 2022-01-24 Project Name: El Salvador COVID-19 Emergency Response Project Loan / Credit No: IBRD / 91000, IBRD / 92290, IBRD / 94290 Health Ministry Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned RECOVID-4-RFB-GO / Equipo, Component 1: Emergency C Open - Internationa Single Stage - One E 2022-02-1 cristalería, insumos y mobilia IBRD / 91000 OVID-19 response to preven Post Request for Bids 914,805.00 0.00 Canceled 2021-03-22 2021-04-15 2021-05-31 2021-07-20 2021-08-19 l nvelope 5 rio para Laboratorio de Biolo tion, detection and treatmen gía Molecular t  RECOVID-63-RFQ-CW / Adec Component 1: Emergency C uación de infraestructura par Request for Quota OVID-19 response to preven Request for Quota Single Stage - One E 2022-09-2 a la sustitución del sistema d IBRD / 92290 Post Open - National tions (Non Bank-S 52,830.00 0.00 Signed 2022-04-18 2022-05-26 2022-06-27 tion, detection and treatmen tions nvelope 5 e generación de vapor Hospit PD) t  al Nueva Concepción, Chalat enango RECOVID-53-RFB-CW / Remo delación y readecuación de o Component 1: Emergency C Request for Bids - bras eléctricas y electromecá OVID-19 response to preven Single Stage - One E Small Works SPD Pending Imp 2023-04-2 nicas de las instalaciones del IBRD / 92290 Post Request for Bids Open - National 3,900,000.00 0.00 2022-04-12 2022-04-15 2022-05-15 2022-06-14 2022-07-19 tion, detection and treatmen nvelope (1 envelope proce lementation 5 Almacén Regional de Salud d t  ss) el área Metropolitana de San Salvador en el Centro Nacion al de Biológicos RECOVID-138-RFB-CW / Ade Component 1: Emergency C Request for Bids - cuación de Infraestructura pa OVID-19 response to preven Single Stage - One E Small Works SPD Under Imple 2023-06-2 IBRD / 92290 Post Request for Bids Open - National 186,040.00 0.00 2022-10-31 2023-01-25 2022-11-05 2023-03-08 2022-11-25 2023-03-07 2022-12-15 2023-05-18 2022-12-29 ra la Instalación de Cuarto Frí tion, detection and treatmen nvelope (1 envelope proce mentation 7 o de la Región Paracentral de t  ss) Salud del MINSAL RECOVID-96-RFB-CW / Remo delación y readecuación de o Component 1: Emergency C Request for Bids - bras eléctricas y electromecá OVID-19 response to preven Open - Internationa Single Stage - One E Works (without pr 2023-11-1 nicas de las instalaciones del IBRD / 92290 Post Request for Bids 3,650,000.00 0.00 Canceled 2022-10-28 2022-11-02 2022-12-02 2022-12-30 2023-02-03 tion, detection and treatmen l nvelope equalification) SP 0 Almacén Regional de Salud d t  D el Área Metropolitana de San Salvador en el Centro Nacion al de Biológicos. RECOVID-147-DIR-CW / Rem odelación y readecuación de Component 1: Emergency C obras eléctricas y electromec OVID-19 response to preven Other (with field f Under Imple 2023-11-0 ánicas de las instalaciones d IBRD / 92290 Post Direct Selection Direct - National 3,650,000.00 0.00 2022-12-09 2022-12-13 2022-12-14 2023-01-09 2023-01-12 tion, detection and treatmen or explanation) mentation 8 el Almacén Regional de Salu t  d del Área Metropolitana de San Salvador en el Centro Na cional de Biológicos. RECOVID-159-RFB-CW / Rea Component 1: Emergency C decuación y Ampliación Unid OVID-19 response to preven Single Stage - One E Other (with field f 2023-12-0 IBRD / 92290 Post Request for Bids Open - National 833,267.69 0.00 Canceled 2023-01-20 2023-03-23 2023-01-25 2023-03-23 2023-02-24 2023-03-16 2023-04-11 ad de Pediatría Hospital Naci tion, detection and treatmen nvelope or explanation) 7 onal Zacamil, Dr. Juan José F t  ernández RECOVID-175-RFB-CW / Rea Component 1: Emergency C Request for Bids - decuación y Ampliación Unid OVID-19 response to preven Single Stage - One E Small Works SPD Under Imple 2024-05-0 IBRD / 92290 Post Request for Bids Open - National 1,100,000.00 0.00 2023-06-02 2023-06-21 2023-06-07 2023-06-22 2023-07-07 2023-08-06 2023-09-04 ad de Pediatría Hospital Naci tion, detection and treatmen nvelope (1 envelope proce mentation 1 onal Zacamil, Dr. Juan José F t  ss) ernández RECOVID-178-RFB-CW / Amp Component 1: Emergency C Request for Bids - liación de las áreas de Labor OVID-19 response to preven Single Stage - One E Small Works SPD Pending Imp 2024-01-2 atorios Clínicos de las Unidad IBRD / 92290 Post Request for Bids Open - National 150,000.00 0.00 2023-06-16 2023-06-21 2023-07-21 2023-08-18 2023-09-22 tion, detection and treatmen nvelope (1 envelope proce lementation 0 es de Salud de Dulce Nombre t  ss) de María, Chalatenango y Ciu dad Barrios, San Miguel GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RECOVID-1-RFB-GO / Sumini Component 1: Emergency C stro, instalación y puesta en OVID-19 response to preven Open - Internationa Single Stage - One E marcha de equipos de unida IBRD / 91000 Prior Request for Bids 7,131,425.00 0.00 Signed 2021-08-23 2021-12-15 2021-09-13 2021-12-20 2021-10-28 2022-03-15 2021-11-27 2023-01-13 2022-01-25 2022-07-24 tion, detection and treatmen l nvelope d de radiología e imágenes di t  agnósticas para el Hospital N acional El Salvador. RECOVID-10-RFQ-GO / Equip Component 1: Emergency C os de seguridad ocupacional OVID-19 response to preven Request for Quota Single Stage - One E Pending Impl IBRD / 91000 Post Open - National 22,400.00 0.00 2021-09-17 2021-11-28 2022-02-26 para personal elaborando en tion, detection and treatmen tions nvelope ementation áreas de riesgo del Hospital t  El Salvador RECOVID-5-RFQ-GO / Equipo Component 1: Emergency C Request for Quota Single Stage - One E y mobiliario clínico para Hosp IBRD / 91000 OVID-19 response to preven Post Open - National 62,625.00 0.00 Canceled 2021-10-27 2022-01-26 2022-04-26 tions nvelope ital El Salvador tion, detection and treatmen t  Component 1: Emergency C RECOVID-6-RFQ-GO / Mobilia Request for Quota Single Stage - One E IBRD / 91000 OVID-19 response to preven Post Open - National 138,750.00 0.00 Canceled 2021-10-12 2022-01-12 2022-04-12 rio para Hospital El Salvador tions nvelope tion, detection and treatmen t  RECOVID-27-RFQ-GO / Insu Component 2. Project Manag Request for Quota Single Stage - One E mos informáticos para funcio IBRD / 91000 Post Open - National 1,659.00 1,232.88 Signed 2021-08-06 2021-09-27 2021-10-12 2021-10-12 ement and Monitoring tions nvelope namiento de la UGP RECOVID-11-RFQ-GO / Equip Component 1: Emergency C Request for Quota Single Stage - One E o informático y mobiliario par IBRD / 91000 OVID-19 response to preven Post Open - National 8,000.00 8,556.51 Signed 2021-08-16 2021-10-05 2021-11-17 2021-11-19 tions nvelope a ejecución del proyecto tion, detection and treatmen t  RECOVID-7-RFQ-GO / Equipo Component 1: Emergency C s para el fortalecimiento de e OVID-19 response to preven Request for Quota Single Stage - One E Pending Impl spacio de almacén para insu IBRD / 91000 Post Open - National 25,000.00 0.00 2022-01-25 2022-04-14 2022-05-29 tion, detection and treatmen tions nvelope ementation mos y medicamentos dentro t  del Hospital El Salvador Page 1 RECOVID-8-RFQ-GO / Equipo Component 1: Emergency C s para el fortalecimiento de e OVID-19 response to preven Request for Quota Single Stage - One E Pending Impl IBRD / 91000 Post Open - National 30,000.00 0.00 2022-01-17 2022-04-04 2022-07-03 spacio de almacenamiento d tion, detection and treatmen tions nvelope ementation e desechos bioinfecciosos t  RECOVID-9-RFQ-GO / Mobilia Component 1: Emergency C Request for Quota Single Stage - One E Pending Impl rio para las áreas de socializa IBRD / 91000 OVID-19 response to preven Post Open - National 25,000.00 0.00 2021-11-04 2022-01-11 2022-02-25 tions nvelope ementation ción y alimentación del perso tion, detection and treatmen nal t  RECOVID-3-RFB-GO / Sumini Component 1: Emergency C stro, instalación y puesta en f OVID-19 response to preven Open - Internationa Single Stage - One E uncionamiento de equipos pa IBRD / 91000 Prior Request for Bids 2,442,500.00 1,296,504.90 Signed 2021-08-23 2021-12-15 2021-09-13 2021-12-20 2021-10-28 2022-03-03 2021-11-27 2022-06-15 2022-01-08 2022-09-03 2022-07-07 tion, detection and treatmen l nvelope ra la central de esterilización t  del Hospital Nacional El Salva dor RECOVID-2-RFB-GO / Sumini Component 1: Emergency C stro, instalación y puesta en f OVID-19 response to preven Open - Internationa Single Stage - One E Under Imple uncionamiento de equipos de IBRD / 91000 Prior Request for Bids 2,535,000.00 0.00 2021-08-23 2022-03-10 2021-09-13 2022-03-17 2021-10-28 2022-05-30 2021-11-27 2022-10-25 2022-01-25 2022-07-24 tion, detection and treatmen l nvelope mentation la sala de angiógrafo y quiróf t  ano general del Hospital Naci onal El Salvador RECOVID-32-DIR-GO / Adqui Component 1: Emergency C sición de medicamentos (Toc IBRD / 91000 OVID-19 response to preven Post Direct Selection Direct 1,216,656.00 1,216,656.00 Completed 2020-06-24 2020-06-24 2020-06-26 2020-06-26 2020-06-27 2020-06-28 2020-07-20 2020-07-21 ilizumab) tion, detection and treatmen t  RECOVID-33-DIR-GO / Adqui Component 1: Emergency C sición de oxígeno medicinal lí IBRD / 91000 OVID-19 response to preven Post Direct Selection Direct 99,996.00 99,996.49 Completed 2020-07-31 2020-07-30 2020-07-31 2020-07-31 2020-08-01 2020-08-02 2020-09-04 2020-08-12 quido para el Hospital Nacion tion, detection and treatmen al El Salvador t  RECOVID-34-DIR-GO / Adqui Component 1: Emergency C sición de medicamentos (Toc IBRD / 91000 OVID-19 response to preven Post Direct Selection Direct 1,569,568.00 1,569,568.00 Completed 2020-08-06 2020-08-06 2020-08-06 2020-08-06 2020-08-07 2020-08-08 2020-09-06 2020-08-22 ilizumab) tion, detection and treatmen t  RECOVID-35-DIR-GO / Adqui Component 1: Emergency C sición de reactivos de laborat OVID-19 response to preven orio (set de extracción para IBRD / 91000 Post Direct Selection Direct 1,043,455.00 1,043,455.04 Completed 2020-08-07 2020-08-07 2020-08-12 2020-08-12 2020-08-13 2020-08-14 2020-11-11 2020-09-06 tion, detection and treatmen RNA/DNA viral y set de ampli t  ficación de ácidos nucleicos RECOVID-36-DIR-GO / Adqui Component 1: Emergency C sición de oxígeno medicinal lí IBRD / 91000 OVID-19 response to preven Post Direct Selection Direct 99,996.00 99,996.49 Completed 2020-08-12 2020-08-13 2020-08-12 2020-08-12 2020-08-13 2020-08-14 2020-08-22 2020-08-23 quido para el Hospital Nacion tion, detection and treatmen al El Salvador t  RECOVID-28-RFB-GO / Sumi Component 1: Emergency C nistro, instalación y puesta e OVID-19 response to preven Open - Internationa Single Stage - One E n marcha de equipo de Labor IBRD / 91000 Post Request for Bids 1,172,105.00 0.00 Signed 2022-01-07 2022-03-22 2022-01-14 2022-05-11 2022-02-28 2022-06-24 2022-03-30 2022-12-13 2022-05-04 2022-10-31 tion, detection and treatmen l nvelope atorio de Biología Molecular t  para Hospital Nacional El Sal vador RECOVID-37-RFQ-GO / Equip o informático y audio para el Component 2. Project Manag Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 69,591.00 21,678.30 Signed 2022-01-26 2022-03-24 2022-06-23 2022-06-22 fortalecimiento del área de p ement and Monitoring tions nvelope romoción de la salud. RECOVID-38-RFQ-GO / Adqui Component 2. Project Manag Request for Quota Single Stage - One E sición de mobiliario de oficin IBRD / 92290 Post Open - National 20,670.00 9,596.11 Signed 2022-01-31 2022-03-28 2022-02-24 2022-04-27 ement and Monitoring tions nvelope a para dependencias del MIN SAL y UGPPI RECOVID-39-RFQ-GO / Papel Component 1: Emergency C ería para el fortalecimiento al OVID-19 response to preven Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 7,279.00 5,266.39 Signed 2022-02-01 2022-03-22 2022-05-16 2022-04-21 componente técnico y proces tion, detection and treatmen tions nvelope os en promoción de la salud t  RECOVID-40-RFQ-GO / Mobili Component 1: Emergency C ario para el fortalecimiento al OVID-19 response to preven Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 23,130.00 16,519.00 Signed 2022-01-24 2022-04-07 2022-07-19 2022-06-06 componente técnico y proces tion, detection and treatmen tions nvelope os de promoción de la salud t  RECOVID-49-DIR-GO / Vacun Component 1: Emergency C a contra SARS COV-2 inactiva IBRD / 92290 OVID-19 response to preven Prior Direct Selection Direct 20,000,000.00 0.00 Canceled 2021-04-23 2021-12-22 2021-04-23 2021-12-22 2021-04-26 2021-07-01 da CORONAVAC suspensión i tion, detection and treatmen nyectable t  RECOVID-49-DIR-GO-2 / Vac Component 1: Emergency C una contra SARS COV-2 inact IBRD / 92290 OVID-19 response to preven Post Direct Selection Direct 20,000,000.00 30,000,000.00 Completed 2021-04-23 2021-12-03 2021-04-23 2021-12-10 2021-04-26 2021-03-11 2021-07-01 2021-07-02 ivada CORONAVAC suspensió tion, detection and treatmen n inyectable t  Component 1: Emergency C RECOVID-54-DIR-GO / Equip IBRD / 91000 OVID-19 response to preven Post Direct Selection Direct 1,499,250.00 1,499,250.00 Completed 2020-07-06 2020-07-06 2020-07-07 2020-07-07 2020-07-08 2020-07-09 2020-09-06 2020-09-08 o de alto flujo de oxigeno tion, detection and treatmen t  RECOVID-55-DIR-GO / Adqui Component 1: Emergency C sición de materiales de aseo OVID-19 response to preven personal para Regiones de S IBRD / 91000 Post Direct Selection Direct 102,812.00 115,711.88 Completed 2020-02-01 2020-02-03 2020-02-07 2020-02-07 2020-03-04 2020-03-05 2020-11-09 2020-03-27 tion, detection and treatmen alud y Hospitales Nacionales t  para atender emergencia del Coronavirus. Component 1: Emergency C RECOVID-56-RFB-GO / Insum Single Stage - One E IBRD / 92290 OVID-19 response to preven Post Request for Bids Open - National 200,000.00 181,010.00 Signed 2022-03-31 2022-03-23 2022-04-05 2022-05-05 2022-06-19 2022-05-25 2022-06-08 2022-06-29 2022-07-17 2022-09-27 2022-08-20 os médicos de bioseguridad nvelope tion, detection and treatmen t  RECOVID-57-RFB-GO / Sumi Component 1: Emergency C nistro de emisor Rayos X par OVID-19 response to preven IBRD / 92290 Post Direct Selection Direct 226,050.00 0.00 Canceled 2022-03-04 2022-03-11 2022-04-09 2022-05-09 a equipo de Tomografía para tion, detection and treatmen Hospitales Nacionales. t  RECOVID-61-RFB-GO / Sumi nistro, instalación y puesta e n marcha de sistemas de: ex Component 1: Emergency C tracción de aire y aire acondi OVID-19 response to preven Single Stage - One E IBRD / 92290 Post Request for Bids Open - National 329,509.00 0.00 Canceled 2022-04-04 2022-04-11 2022-05-11 2022-06-10 2022-07-08 2023-01-04 cionado de aplicación especi tion, detection and treatmen nvelope al (100% aire exterior) y recir t  culado, para Hospital Nacion al General Zacamil "Dr. Juan J osé Fernández". RECOVID-62-RFB-GO / Sumi Component 1: Emergency C nistro, instalación y puesta e OVID-19 response to preven Single Stage - One E IBRD / 92290 Post Request for Bids Open - National 606,849.00 0.00 Signed 2022-04-11 2022-05-17 2022-04-18 2022-05-17 2022-05-18 2022-06-28 2022-06-17 2022-07-28 2022-07-22 2023-01-18 n marcha de equipo generad tion, detection and treatmen nvelope or de vapor, caldera 100 bhp t  y periféricos. RECOVID-57-DIR-GO / Sumin Component 1: Emergency C istro de emisor Rayos X para IBRD / 92290 OVID-19 response to preven Post Direct Selection Direct 226,050.00 226,050.00 Signed 2022-03-28 2022-03-31 2022-04-04 2022-04-04 2022-04-25 2022-06-11 2022-05-10 equipo de Tomografía para H tion, detection and treatmen ospitales t  Page 2 RECOVID-65-RFQ-GO / Equip Component 1: Emergency C Request for Quota Single Stage - One E Under Imple o informático y software para IBRD / 92290 OVID-19 response to preven Post Open - National 30,000.00 0.00 2022-04-18 2022-06-06 2022-10-04 tions nvelope mentation el fortalecimiento de Epidemi tion, detection and treatmen ología MINSAL t  RECOVID-66-RFQ-GO / Mater Component 1: Emergency C iales promocionales para ide OVID-19 response to preven Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 10,000.00 0.00 Signed 2022-04-19 2022-06-07 2022-07-07 ntificación del personal de ep tion, detection and treatmen tions nvelope idemiología de campo t  RECOVID-67-RFQ-GO / Aires Component 1: Emergency C Request for Quota Single Stage - One E acondicionados para depend IBRD / 92290 OVID-19 response to preven Post Open - National 36,000.00 0.00 Canceled 2022-05-18 2022-07-13 2022-08-12 tions nvelope encias del MINSAL tion, detection and treatmen t  RECOVID-68-RFQ-GO / Adqui Component 1: Emergency C sición de Mobiliario para el fo OVID-19 response to preven Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 6,711.00 0.00 Signed 2022-05-18 2022-07-06 2022-08-05 rtalecimiento de la Dirección tion, detection and treatmen tions nvelope de Promoción de Salud t  RECOVID-69-RFQ-GO / Adqui Component 2. Project Manag Request for Quota Single Stage - One E sición de equipo de computo IBRD / 92290 Post Open - National 30,000.00 13,565.25 Signed 2022-05-13 2022-06-27 2022-07-21 2022-08-26 ement and Monitoring tions nvelope para ser utilizado en la UGP-P I RECOVID-71-RFW-GO / Insu Component 2. Project Manag Request for Quota Single Stage - One E mos Infromáticos para funcio IBRD / 92290 Post Open - National 2,000.00 0.00 Canceled 2022-05-07 2022-06-14 2022-06-29 ement and Monitoring tions nvelope namiento de UGP RECOVID-72-RFQ-NC / Contr atación de servicios de alime ntación y uso de instalacion Component 2. Project Manag Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 7,400.00 6,880.00 Signed 2022-05-16 2022-07-25 2022-07-29 2023-05-31 es para jornadas de socializa ement and Monitoring tions nvelope ción con partes interesadas, poblaciones vulnerables y for talecimiento y personal de sa lud. RECOVID-73-RFB-GO / Adqui Component 1: Emergency C sición de estantería industrial OVID-19 response to preven Single Stage - One E Pending Impl y equipo de carga para fortal IBRD / 92290 Post Request for Bids Open - National 190,000.00 0.00 2022-05-17 2022-05-23 2022-07-04 2022-08-03 2022-09-07 2023-02-04 tion, detection and treatmen nvelope ementation ecer la cadena de suministro t  s con la mejora del almacén El Paraíso del MINSAL RECOVID-78-RFQ-GO / Adqui sición y Suministro de Insum Component 2. Project Manag Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 59,500.00 0.00 Signed 2022-06-20 2022-09-09 2022-08-18 2022-09-19 os para Establecimientos de ement and Monitoring tions nvelope Salud en el Marco de la Gesti ón Ambiental RECOVID-80-RFB-GO / Comp ra de frigoríficos para fortale Component 1: Emergency C cimiento de la cadena de frío OVID-19 response to preven Open - Internationa Single Stage - One E Under Imple IBRD / 92290 Post Request for Bids 1,200,000.00 0.00 2022-06-24 2023-01-10 2022-08-08 2023-01-18 2022-09-19 2023-03-02 2022-10-19 2023-06-07 2022-11-23 2023-03-23 del MINSAL para el almacena tion, detection and treatmen l nvelope mentation miento adecuado de vacunas t  , con énfasis en la vacuna co ntar la COVID-19 RECOVID-81-DIR-GO / Adqui sición y Suministro de Repue stos como parte del servicio Component 1: Emergency C del mantenimiento preventiv OVID-19 response to preven o y correctivo de equipo de R IBRD / 92290 Post Direct Selection Direct 29,000.00 0.00 Signed 2022-06-24 2022-07-27 2022-07-01 2022-08-10 2022-08-05 2023-01-02 tion, detection and treatmen esonancia Magnética del Hos t  pital Nacional Rosales y de la Fuente de Suministro Eléctric o UPS para el Hospital Nacion al General Neumología RECOVID-82-RFQ-GO / Adqui Component 1: Emergency C sición de Equipo informático OVID-19 response to preven Request for Quota Single Stage - One E Under Imple IBRD / 92290 Post Open - National 54,500.00 0.00 2022-07-20 2022-09-22 2022-12-21 y audio para el fortalecimient tion, detection and treatmen tions nvelope mentation o del área de promoción de l t  a salud. RECOVID-41-RFB-GO / Sumi nistro, instalación y puesta e Component 1: Emergency C n marcha de planta generad OVID-19 response to preven Open - Internationa Single Stage - One E IBRD / 92290 Prior Request for Bids 5,000,000.00 0.00 Canceled 2022-01-31 2022-02-04 2022-03-21 2022-04-20 2022-06-03 2022-11-30 ora de oxígeno médico (PGO tion, detection and treatmen l nvelope M) para el sistema hospitalari t  o del Ministerio de Salud de E l Salvador RECOVID-83-RFB-GO / SUMI NISTRO, INSTALACIÓN Y PUE Component 1: Emergency C STA EN FUNCIONAMIENTO DE OVID-19 response to preven Open - Internationa Single Stage - One E Under Imple IBRD / 92290 Post Request for Bids 867,100.00 0.00 2022-08-08 2022-10-04 2022-08-18 2022-10-05 2022-09-29 2022-11-15 2022-10-28 2023-01-16 2022-12-02 2023-05-01 LAVADORAS TERMODESINFE tion, detection and treatmen l nvelope mentation CTADORAS Y BAÑOS ULTRAS t  ONICOS PARA HOSPITAL NAC IONAL EL SALVADOR. RECOVID-84-RFQ-GO / SUMI Component 1: Emergency C NISTRO, INSTALACIÓN Y PUE OVID-19 response to preven Request for Quota Single Stage - One E STA EN FUNCIONAMIENTO DE IBRD / 92290 Post Open - National 30,000.00 0.00 Signed 2022-08-08 2022-10-03 2023-03-02 tion, detection and treatmen tions nvelope MAQUINAS PARA CORTAR TE t  LA PARA HOSPITAL NACIONA L EL SALVADOR. RECOVID-76-RFB-GO / SUMI Component 1: Emergency C NISTRO, INSTALACIÓN Y PUE OVID-19 response to preven Single Stage - One E STA EN FUNCIONAMIENTO DE IBRD / 92290 Post Request for Bids Open - National 121,500.00 0.00 Signed 2022-06-01 2022-08-29 2022-06-06 2022-10-07 2022-07-18 2022-10-07 2022-08-17 2023-01-18 2022-09-21 2022-12-20 tion, detection and treatmen nvelope EQUIPO DE ENDOSCOPIA PAR t  A EL HOSPITAL NACIONAL RO SALES. RECOVID-87-RFB-GO / SUMI Component 1: Emergency C NISTRO, INSTALACIÓN Y PUE OVID-19 response to preven Open - Internationa Single Stage - One E Under Imple STA EN MARCHA DE EQUIPOS IBRD / 92290 Post Request for Bids 844,000.00 0.00 2022-09-02 2022-12-05 2022-09-19 2023-02-10 2022-10-31 2022-11-30 2023-01-04 2023-07-03 tion, detection and treatmen l nvelope mentation DE RAYOS "X" DIGITALES EN t  HOSPITALES PRIORIZADOS RECOVID-88-DIR-GO / Adqui Component 1: Emergency C sición de Vacuna inactiva par OVID-19 response to preven Direct - Internation IBRD / 94290 Prior Direct Selection 15,600,000.00 35,600,000.00 Completed 2021-03-10 2022-08-15 2021-03-10 2022-08-16 2021-03-10 2021-03-11 2021-05-19 2021-05-20 a la profilaxis del SARS CoV-2 tion, detection and treatmen al SINOVAC original t  RECOVID-89-DIR-GO / Adqui Component 1: Emergency C sición de BNT 162, Vacuna A OVID-19 response to preven Direct - Internation RNm dirigida contra SARS Co IBRD / 94290 Prior Direct Selection 29,694,600.00 29,694,600.00 Completed 2021-05-07 2022-08-09 2021-05-07 2022-08-09 2021-05-25 2021-05-20 2022-03-04 2021-12-31 tion, detection and treatmen al V-2 para prevenir la infección t  por COVID-19 en los seres hu manos RECOVID-90-DIR-GO / Adqui Component 1: Emergency C sición de vacuna para SARS- OVID-19 response to preven Direct - Internation IBRD / 94290 Prior Direct Selection 15,000,000.00 15,000,000.00 Completed 2021-05-07 2022-08-15 2021-05-15 2022-08-16 2021-06-17 2021-06-18 2021-07-23 2021-09-12 CoV-2 (VERO CELL) inactivad tion, detection and treatmen al a Vacuna COVID-19 (VERO C t  ELL Inactivada) Page 3 RECOVID-91-DIR-GO / Vacun Component 1: Emergency C Direct - Internation a contra SARS COV-2 inactiva IBRD / 94290 OVID-19 response to preven Prior Direct Selection 5,000,000.00 35,000,000.00 Completed 2021-04-23 2022-08-09 2021-04-23 2022-08-10 2021-04-26 2021-03-11 2021-07-01 2021-07-08 al da CORONAVAC suspensión i tion, detection and treatmen nyectable t  RECOVID-75-RFB-GO / SUMI NISTRO, INSTALACIÓN Y PUE Component 1: Emergency C STA EN MARCHA DEL SISTEM OVID-19 response to preven Single Stage - One E IBRD / 92290 Post Request for Bids Open - National 48,000.00 0.00 Canceled 2022-06-01 2022-06-06 2022-07-18 2022-08-17 2022-09-21 2023-01-19 A DE AIRE ACONDICIONADO tion, detection and treatmen nvelope Y VENTILACIÓN MECÁNICA, P t  ARA EL LABORATORIO DE PA TOLOGÍA DEL HOSPITAL ROS ALES. RECOVID-92-RFQ-GO / Aires Component 1: Emergency C Request for Quota Single Stage - One E Acondicionados para depend IBRD / 92290 OVID-19 response to preven Post Open - National 9,500.00 0.00 Signed 2022-09-02 2022-11-02 2023-01-01 tions nvelope encias del MINSAL tion, detection and treatmen t  RECOVID-86-RFQ-GO / SUMI Component 1: Emergency C NISTRO, INSTALACIÓN Y PUE OVID-19 response to preven Request for Quota Open - Internationa Single Stage - One E Under Imple STA EN MARCHA DE TOMOG IBRD / 92290 Post 1,350,000.00 0.00 2022-09-26 2022-11-21 2023-05-20 tion, detection and treatmen tions l nvelope mentation RAFO COMPUTARIZADO MUL t  TICORTE PARA EL HOSPITAL NACIONAL DE LA MUJER RECOVID-85-RFQ-GO / SUMI NISTRO, INSTALACIÓN Y PUE STA EN MARCHA DE EQUIPOS Component 1: Emergency C DE UNIDAD DE RADIOLOGÍA OVID-19 response to preven Request for Quota Open - Internationa Single Stage - One E Under Imple IBRD / 92290 Prior 7,501,000.00 0.00 2022-09-26 2023-02-24 2022-11-21 2023-05-20 E IMÁGENES DIAGNÓSTICAS tion, detection and treatmen tions l nvelope mentation PARA EL HOSPITAL NACIONA t  L ROSALES, HOSPITAL NACIO NAL ZACAMIL Y HOSPITAL NA CIONAL SAN RAFAEL RECOVID-95-RFB-GO / Sumi Component 1: Emergency C nistro, Instalación y Puesta e OVID-19 response to preven Single Stage - One E IBRD / 92290 Post Request for Bids Open - National 200,000.00 0.00 Signed 2022-09-30 2022-11-24 2022-10-05 2023-01-30 2022-11-04 2023-01-12 2022-12-02 2023-02-23 2022-12-22 2023-05-21 n funcionamiento de Autocla tion, detection and treatmen nvelope ve para Hospital Nacional Sa t  n Vicente RECOVID-97-RFB-GO / Adqui Component 1: Emergency C sición de estantería industrial OVID-19 response to preven Single Stage - One E Under Imple y equipo de carga para mejor IBRD / 92290 Post Request for Bids Open - National 250,000.00 0.00 2022-10-14 2022-11-28 2022-10-19 2022-12-05 2022-11-18 2023-01-04 2022-12-16 2023-02-03 2023-01-20 2023-06-19 tion, detection and treatmen nvelope mentation ar el almacenamiento en alm t  acén el Paraíso del MINSAL. RECOVID-99-RFB-GO / Sumi Component 1: Emergency C nistro, Instalación y Puesta e OVID-19 response to preven Single Stage - One E Pending Impl IBRD / 92290 Post Request for Bids Open - National 100,000.00 0.00 2022-10-10 2022-10-17 2022-11-28 2022-12-28 2023-02-01 2023-08-30 n marcha de Curato Frío Regi tion, detection and treatmen nvelope ementation ón Central de Salud, Ministeri t  o de Salud RECOVID-100-RFQ-GO / Aire Component 1: Emergency C s Acondicionados Dependenc OVID-19 response to preven Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 26,500.00 0.00 Signed 2022-11-02 2022-12-28 2023-02-11 ias del MINSAL: Dirección de tion, detection and treatmen tions nvelope Inmunizaciones y Centro Nac t  ional de Biológicos RECOVID-101-RFB-GO / Sum inistro, Instalación y Puesta e Component 2. Project Manag Single Stage - One E Under Imple IBRD / 92290 Post Request for Bids Open - National 200,000.00 0.00 2022-10-31 2023-02-07 2022-11-07 2023-02-07 2022-12-19 2023-01-18 2023-02-22 2023-08-21 n Marcha de Paneles Solares ement and Monitoring nvelope mentation para Hospitales Priorizados, Ministerio de Salud RECOVID-DIR-102-GO / ADQ Component 1: Emergency C UISICIÓN DE CARRO PARA CU OVID-19 response to preven RACIONES PARA STABLECIMI IBRD / 94290 Post Direct Selection Direct - National 331,000.00 331,000.00 Signed 2021-01-12 2021-01-12 2021-03-02 2021-03-02 2021-04-06 2021-04-20 2021-10-03 tion, detection and treatmen ENTOS DE SALUD DE APLICA t  CIÓN DE LA VACIUNA CONTR A COVID-19 RECOVID-DIR-103-GO / ADQ Component 1: Emergency C UISICION DE MEDICAMENTOS OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 1,867,320.00 1,867,320.00 Signed 2022-01-19 2021-11-22 2022-02-01 2022-02-01 2022-02-24 2022-03-08 2022-05-25 CASIMIRAB E INDIMIRAB PAR tion, detection and treatmen A EL TRATAMIENTO DE COVI t  D 19 Component 1: Emergency C RECOVID-DIR-104-GO / ADQ IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 9,000.00 9,000.00 Completed 2021-01-11 2021-01-20 2021-02-04 2021-02-04 2021-03-10 2021-03-21 2021-12-31 2021-07-28 UISICIÓN DE EQUIPO MÉDICO tion, detection and treatmen t  RECOVID-DIR-106-GO / ADQ Component 1: Emergency C UISICIÓN DE INSUMOS DE LA OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 1,685,635.84 1,685,635.84 Signed 2021-02-25 2021-03-02 2021-03-04 2021-03-04 2021-03-11 2021-03-16 2021-07-11 BORATORIO (SET DE AMPLIFI tion, detection and treatmen CACIÓN DE ÁCIDOS NUCLEIC t  OS RT-PCR Y PCR) RECOVID-DIR-107-GO / ADQ Component 1: Emergency C UISICIÓN DE INSUMOS MEDIC IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 2,283,600.00 2,283,600.00 Signed 2021-03-05 2021-03-09 2021-03-22 2021-03-22 2021-04-20 2021-04-21 2021-05-31 OS (MASCARILLAS N95) tion, detection and treatmen t  RECOVID-DIR-109-GO / ADQ Component 1: Emergency C UISICIÓN DE MEDICAMENTOS IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 73,730.00 73,730.00 Signed 2021-03-15 2021-03-19 2021-04-08 2021-04-08 2021-04-27 2021-04-28 2021-05-20 (ÁCIDO ACETILSALICILICO) tion, detection and treatmen t  RECOVID-DIR-111-GO / ADQ UISICION DE SUMINISTROS (C Component 1: Emergency C INTAS Y CARTUCHOS PARA I OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 180,540.00 180,540.00 Signed 2021-03-18 2021-04-28 2021-05-19 2021-05-19 2021-06-15 2021-06-16 2021-12-31 MPRESORAS) PARA ESTABLE tion, detection and treatmen CIMIENTOS DE APLICACIÓN D t  E LA VACUNA CONTRA EL SA RS-COVID-II RECOVID-DIR-112-GO / ADQ Component 1: Emergency C UISICIÓN DE SUMINISTROS D OVID-19 response to preven E OFICINA PARA ESTABLECIM IBRD / 94290 Post Direct Selection Direct - National 82,507.00 82,506.29 Signed 2021-03-18 2021-04-20 2021-05-21 2021-05-21 2021-06-25 2021-07-05 2021-12-31 tion, detection and treatmen IENTOS DE APLICACIÓN DE L t  A VACUNA CONTRA EL SARS- COVID-II RECOVID-DIR-114-GO / ADQ Component 1: Emergency C UISICIÓN DE MOBILIARIO (CA OVID-19 response to preven NOPY) PARA ESTABLECIMIEN IBRD / 94290 Post Direct Selection Direct - National 296,510.00 296,510.00 Signed 2021-04-15 2021-04-20 2021-04-29 2021-04-29 2021-05-14 2021-05-15 2021-06-15 tion, detection and treatmen TOS DE APLICACIÓN DE LA V t  ACUNA CONTRA EL SARS-CO VID-II RECOVID-DIR-115-GO / ADQ Component 1: Emergency C UISICIÓN DE MEDICAMENTOS OVID-19 response to preven : TOCILIZUMAB 20 MG/ML CO IBRD / 94290 Post Direct Selection Direct - National 1,783,600.00 1,783,600.00 Signed 2021-04-26 2021-04-27 2021-05-20 2021-05-20 2021-07-01 2021-07-02 2021-09-20 tion, detection and treatmen NCENTRADO PARA LIQUIDO P t  ARENTERAL PARA PERFUSIO N FRASCO VIAL 10 ML RECOVID-DIR-117-GO / MEDI Component 1: Emergency C O DE TRANSPORTE UNIVERS OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 177,800.00 177,800.00 Completed 2021-06-11 2021-06-23 2021-06-28 2021-06-28 2021-07-12 2021-07-22 2021-07-15 2021-09-15 AL PARA VIRUS, CON HISOPO tion, detection and treatmen INCORPORADO CAJA (50-100) t  UNIDADES Page 4 RECOVID-DIR-119-GO / SUMI Component 1: Emergency C NISTRO DE ALGODÓN HIDRO IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 225,990.00 225,990.00 Signed 2021-09-06 2021-09-06 2021-09-28 2021-09-28 2021-11-08 2021-11-20 2021-12-31 FILO ABSORBENTE EN LIBRA tion, detection and treatmen S t  RECOVID-DIR-120-GO / ADQ Component 1: Emergency C UISICIÓN DE INSUMOS MEDIC OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 1,777,174.85 1,777,174.85 Signed 2021-09-16 2021-09-20 2021-09-27 2021-09-27 2021-11-26 2021-12-12 2021-12-31 OS PARA LA DIRECCIÓN NACI tion, detection and treatmen ONAL HOSPITALES t  RECOVID-DIR-121-GO / ADQ Component 1: Emergency C UISICIÓN DE MEDICAMENTOS IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 748,587.53 748,587.61 Signed 2021-09-16 2021-09-21 2021-09-24 2021-09-24 2021-11-24 2021-12-06 2021-12-31 PARA LA DIRECCIÓN NACION tion, detection and treatmen AL HOSPITALES t  RECOVID-DIR-122-GO / ADQ Component 1: Emergency C UISICIÓN DE CASIRIVIMAB E I OVID-19 response to preven MDEVIMAB 120 MG/ML CONC IBRD / 94290 Post Direct Selection Direct - National 1,867,320.00 1,867,320.00 Signed 2021-09-17 2021-09-17 2021-09-19 2021-09-14 2021-09-21 2021-09-26 2021-11-05 tion, detection and treatmen ENTRADO PARA LIQUIDO PAR t  ENTERAL, FRASCO VIAL DE 6 A 20 ML SOLIDO, ORAL RECOVID-DIR-123-GO / ADQ Component 1: Emergency C UISICIÓN DE MEDICAMENTO IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 220,000.00 220,000.00 Signed 2021-10-06 2021-10-18 2021-11-29 2021-11-01 2021-12-01 2021-12-02 2021-12-31 EDOXABAN 60 MG tion, detection and treatmen t  RECOVID-DIR-128-GO / OXIG Component 1: Emergency C ENO MEDICINAL PARA PACIE OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 3,919,020.00 3,919,020.00 Signed 2021-09-16 2021-09-17 2021-09-18 2021-09-18 2021-09-20 2021-09-21 2021-12-31 NTES CON COVID-19 HOSPIT tion, detection and treatmen AL NACIONAL EL SALVADOR t  RECOVID-DIR-132-GO / PRO Component 1: Emergency C DUCCIÓN Y SUMINISTRO DE OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 58,375.80 0.00 Completed 2021-07-17 2021-07-23 2021-07-24 2021-07-24 2021-08-13 2021-09-01 2021-09-10 MOBILIARIO PARA ESTACION tion, detection and treatmen MOVIL DE VACUNACIÓN t  RECOVID-DIR-134-GO / ADQ Component 1: Emergency C UISICION DE ACIDO ASCÓRBI IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 246,035.00 0.00 Completed 2021-11-03 2021-11-12 2021-11-17 2021-11-19 2021-12-23 2022-01-03 2022-05-20 CO PARA KIT COVID 19 (VITA tion, detection and treatmen MINA C) t  RECOVID-135-RFQ-GO / ADQ UISICIÓN DE ARTÍCULOS DE L Component 2. Project Manag Request for Quota Single Stage - One E Under Imple IMPIEZA, ALIMENTACIÓN Y M IBRD / 92290 Post Open - National 2,210.00 0.00 2022-10-19 2022-12-01 2022-12-16 ement and Monitoring tions nvelope mentation ANIPULACIÓN DE ALIMENTOS PARA FUNCIONAMIENTO DE L A UGPPI RECOVID-64-RFB-GO / Sumi Component 1: Emergency C nistro, instalación y puesta e OVID-19 response to preven Single Stage - One E IBRD / 92290 Post Request for Bids Open - National 315,000.00 0.00 Canceled 2022-04-19 2022-06-15 2022-04-26 2022-05-26 2022-07-27 2022-06-25 2022-07-30 2023-02-25 n marcha de cuarto frio Regi tion, detection and treatmen nvelope ón Paracentral de Salud, Mini t  sterio de Salud RECOVID-DIR-140-GO / ADQ Component 1: Emergency C UISICIÓN DE MEDICAMENTOS IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 555,300.00 0.00 Signed 2022-01-07 2022-01-24 2022-02-01 2022-02-01 2022-02-24 2022-12-31 PARA KIT COVID 19 tion, detection and treatmen t  RECOVID-DIR-143-GO / ADQ Component 1: Emergency C UISICION DE MEDICAMENTO IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 666,876.00 0.00 Completed 2021-10-08 2021-10-12 2021-10-18 2021-10-15 2021-11-25 2022-02-25 2022-02-07 PARA KIT COVID 19 tion, detection and treatmen t  RECOVID-DIR-142-GO / ADQ Component 1: Emergency C UISICIÓN DE CUPONES DE C OVID-19 response to preven Single Stage - One E OMBUSTIBLE PARA ABASTECI IBRD / 94290 Post Request for Bids Open - National 90,250.00 0.00 Canceled 2021-04-29 2021-06-02 2021-05-09 2021-07-02 2021-07-12 2021-07-30 2021-12-31 tion, detection and treatmen nvelope MIENTO DE FLOTA DE VEHIC t  ULOS DEL NIVEL SUPERIOR M INSAL RECOVID-DIR-145-GO / ADQ Component 1: Emergency C UISICIÓN DE CUPONES DE C OVID-19 response to preven OMBUSTIBLE PARA ABASTECI IBRD / 94290 Post Direct Selection Direct - National 90,250.00 0.00 Completed 2021-04-29 2021-06-02 2021-07-02 2021-07-02 2021-07-30 2021-12-31 tion, detection and treatmen MIENTO DE FLOTA DE VEHIC t  ULOS DEL NIVEL SUPERIOR M INSAL RECOVID-146-RFQ-GO / Adq uisición de 7 boletos aéreos para la capacitación de siete Component 2. Project Manag Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 10,000.00 0.00 Canceled 2022-11-11 2022-11-16 2022-12-16 profesionales del Laboratorio ement and Monitoring tions nvelope Clínico Nacional de Salud Púb lica en secuenciación genómi ca del SARS-Cov-2. RECOVID-148-DIR-GO / SUMI NISTRO, INSTALACIÓN Y PUE Component 1: Emergency C STA EN FUNCIONAMIENTO DE OVID-19 response to preven Under Imple IBRD / 92290 Post Direct Selection Direct - National 29,000.00 0.00 2022-12-16 2023-01-04 2022-12-21 2023-01-06 2023-01-25 2023-05-25 VIDEO-ENDOSCOPIO Y MONIT tion, detection and treatmen mentation OR A COLOR 19", GRADO MÉ t  DICO PARA EL HOSPITAL NAC IONAL ROSALES. RECOVID-75-RFQ-GO / SUMI NISTRO, INSTALACIÓN Y PUE Component 1: Emergency C STA EN MARCHA DEL SISTEM OVID-19 response to preven Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 48,000.00 0.00 Canceled 2022-08-24 2022-10-26 2023-02-23 A DE AIRE ACONDICIONADO tion, detection and treatmen tions nvelope Y VENTILACIÓN MECÁNICA, P t  ARA EL LABORATORIO DE PA TOLOGÍA DEL HOSPITAL ROS ALES. RECOVID-149-RFQ-GO / SUM INISTRO, INSTALACIÓN Y PUE Component 1: Emergency C STA EN MARCHA DEL SISTEM OVID-19 response to preven Request for Quota Single Stage - One E A DE AIRE ACONDICIONADO IBRD / 92290 Post Open - National 48,000.00 0.00 Canceled 2023-01-18 2023-05-18 2023-03-11 2023-07-09 tion, detection and treatmen tions nvelope Y VENTILACIÓN MECÁNICA, P t  ARA EL LABORATORIO DE PA TOLOGÍA DEL HOSPITAL ROS ALES. RECOVID-156-RFB-GO / Sum inistro, instalación y puesta e Component 1: Emergency C n marcha de Cabinas de bios OVID-19 response to preven Single Stage - One E Under Imple IBRD / 91000 Post Request for Bids Open - National 194,472.55 0.00 2023-01-27 2023-02-13 2023-02-01 2023-02-14 2023-03-03 2023-03-30 2023-03-23 2023-06-20 2023-04-20 2023-10-17 eguridad, Esterilizador y Sist tion, detection and treatmen nvelope mentation ema de ultrapurificación de a t  gua para Hospital Nacional El Salvador. RECOVID-157-RFQ-GO / Insu Component 2. Project Manag Request for Quota Single Stage - One E Under Imple mos informáticos para funcio IBRD / 92290 Post Open - National 2,865.00 0.00 2023-01-03 2023-02-20 2023-03-07 ement and Monitoring tions nvelope mentation namiento de la UGP RECOVID-158-RFB-GO / Sum Component 1: Emergency C Single Stage - One E Under Imple inistro de Torre de Video colo IBRD / 91000 OVID-19 response to preven Post Request for Bids Open - National 141,350.00 0.00 2023-01-13 2023-02-13 2023-01-18 2023-02-13 2023-02-17 2023-03-20 2023-04-18 2023-07-17 nvelope mentation noscopia para el Hospital Na tion, detection and treatmen cional Rosales t  Page 5 RECOVID-161-RFB-GO / Adq Component 1: Emergency C uisición de equipo informátic OVID-19 response to preven Single Stage - One E Pending Impl o para el fortalecimiento de l IBRD / 92290 Post Request for Bids Open - National 133,932.55 0.00 2023-02-15 2023-02-20 2023-03-22 2023-04-21 2023-05-23 2023-09-20 tion, detection and treatmen nvelope ementation a Dirección de Comunicación t  Social e Institucional RECOVID-162-RFQ-GO / Sum Component 1: Emergency C inistro, Instalación y Puesta e OVID-19 response to preven Request for Quota Single Stage - One E Pending Impl IBRD / 92290 Post Open - National 60,000.00 0.00 2023-02-20 2023-04-07 2023-08-05 n Funcionamiento de Baños tion, detection and treatmen tions nvelope ementation Ultrasónicas para HNES. t  RECOVID-163-RFB-GO / Adq Component 1: Emergency C uisición de montacargas para OVID-19 response to preven Single Stage - One E Under Imple IBRD / 92290 Post Request for Bids Open - National 120,250.00 0.00 2023-02-15 2023-03-24 2023-02-20 2023-03-22 2023-04-16 2023-05-21 2023-09-18 mejorar el almacenamiento e tion, detection and treatmen nvelope mentation n almacén el Paraiso del MIN t  SAL. RECOVID-139-RFB-GO / SUM Component 1: Emergency C INISTRO, INSTALACIÓN Y PUE OVID-19 response to preven Single Stage - One E STA EN MARCHA DE CUARTO IBRD / 92290 Post Request for Bids Open - National 139,265.00 0.00 Canceled 2022-10-28 2022-12-13 2022-11-02 2022-12-13 2022-11-25 2022-12-09 2022-12-29 2023-07-27 tion, detection and treatmen nvelope FRIO DE LA REGION PARACE t  NTRAL DE SALUD DEL MINIST ERIO DE SALUD RECOVID-167-RFB-GO / Sum Component 1: Emergency C Single Stage - One E Under Imple inistro, Instalación y Puesta e IBRD / 92290 OVID-19 response to preven Post Request for Bids Open - National 139,265.00 0.00 2023-02-28 2023-03-31 2023-03-05 2023-03-31 2023-04-04 2023-04-24 2023-05-23 2023-11-19 nvelope mentation n Marcha de Cuarto Frío RPS tion, detection and treatmen del MINSAL t  RECOVID-77-RFB-GO / Sumi Component 1: Emergency C nistro de Equipo e Instrumen OVID-19 response to preven Single Stage - One E IBRD / 92290 Post Request for Bids Open - National 170,000.00 0.00 Canceled 2022-08-31 2022-12-08 2022-09-14 2022-12-08 2022-10-15 2022-11-14 2022-12-06 2023-04-05 tal para Unidad de Oftalmolo tion, detection and treatmen nvelope gía de Hospital del Hospital N t  acional Zacamil RECOVID-165-RFQ-GO / Sum Component 1: Emergency C inistro de Equipo para Unidad OVID-19 response to preven Request for Quota Single Stage - One E Under Imple IBRD / 92290 Post Open - National 40,000.00 0.00 2023-03-08 2023-05-18 2023-04-23 2023-08-21 de Oftalmología de Hospital tion, detection and treatmen tions nvelope mentation del Hospital Nacional Zacami t  l RECOVID-166-RFQ-GO / Sum Component 1: Emergency C inistro de Instrumental para OVID-19 response to preven Request for Quota Single Stage - One E Pending Impl IBRD / 92290 Post Open - National 150,000.00 0.00 2023-03-08 2023-04-27 2023-08-25 Unidad de Oftalmología de H tion, detection and treatmen tions nvelope ementation ospital del Hospital Nacional t  Zacamil RECOVID-173-RFQ-GO / Adq Component 1: Emergency C uisición de Equipo Informátic OVID-19 response to preven Request for Quota Single Stage - One E Pending Impl IBRD / 92290 Post Open - National 34,595.68 0.00 2023-05-24 2023-07-15 2023-11-12 o para el fortalecimiento de tion, detection and treatmen tions nvelope ementation Unidad de Promoción Vida Sa t  na y Bienestar RECOVID-1-RFB-GO-BIS / Su Component 1: Emergency C ministro, instalación y puesta OVID-19 response to preven Open - Internationa Single Stage - One E en marcha de equipos de uni IBRD / 91000 Prior Request for Bids 8,349,609.18 0.00 Canceled 2021-08-23 2021-12-20 2022-03-15 2022-06-24 2022-10-24 2023-07-02 tion, detection and treatmen l nvelope dad de radiología e imágenes t  diagnósticas para el Hospital Nacional El Salvador. RECOVID-179-RFQ-GO / Adq Component 1: Emergency C uisición y suministro de equi OVID-19 response to preven Request for Quota Single Stage - One E Pending Impl IBRD / 92290 Post Open - National 32,000.00 0.00 2023-07-05 2023-08-30 2023-11-28 pos de aires acondicionados tion, detection and treatmen tions nvelope ementation en Establecimientos de Salud t  priorizados. RECOVID-181-RFQ-GO / Adq uisición de impresores matric Component 2. Project Manag Request for Quota Single Stage - One E Pending Impl iales, software y accesorios i IBRD / 92290 Post Open - National 34,250.00 0.00 2023-06-28 2023-08-28 2023-11-26 ement and Monitoring tions nvelope ementation nformáticos para el fortaleci miento de la UGGPI y la Paga duría Institucional RECOVID-182-RFB-GO / Sum Component 1: Emergency C inistro, Instalación y Puesta e OVID-19 response to preven Single Stage - One E Pending Impl n Marcha de Equipo generad IBRD / 92290 Post Request for Bids Open - National 275,000.00 0.00 2023-07-14 2023-07-19 2023-08-18 2023-09-18 2023-10-13 2024-02-10 tion, detection and treatmen nvelope ementation or de vapor, caldera 80 VHP t  y periféricos. Hospital Nacion al Zacamil. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RECOVID-13-RFQ-NC / Contr atación de servicios de agen Component 1: Emergency C cia de publicidad para produ OVID-19 response to preven Request for Quota Single Stage - One E IBRD / 91000 Post Open - National 500,000.00 400,000.00 Signed 2021-09-29 2022-01-10 2022-03-08 2022-07-09 cción y difusión de campañas tion, detection and treatmen tions nvelope de comunicación educativa, t  para el combate de la pande mia contra el COVID-19. RECOVID-16-RFQ-NC / Servic io de rotulación que visibilice Component 1: Emergency C las recomendaciones y medi OVID-19 response to preven Request for Quota Single Stage - One E Pending Impl IBRD / 91000 Post Open - National 35,000.00 0.00 2021-11-11 2022-01-21 2022-03-07 das contenidas en los lineami tion, detection and treatmen tions nvelope ementation entos técnicos para la protec t  ción del personal por la emer gencia del COVID-19 RECOVID-58-RFQ-NC / Servic io de arrendamiento de fotoc Component 2. Project Manag Request for Quota Single Stage - One E IBRD / 92290 Post Open - National 7,000.00 6,999.00 Signed 2022-03-23 2022-04-27 2022-05-15 2023-04-27 opiadora e impresiones para ement and Monitoring tions nvelope apoyar la Gestión de la UGPP I RECOVID-59-RFQ-NC / Servic Component 2. Project Manag Request for Quota Single Stage - One E ios de mantenimiento de equ IBRD / 92290 Post Open - National 15,000.00 4,320.00 Signed 2022-03-23 2022-04-27 2022-06-08 2023-04-27 ement and Monitoring tions nvelope ipos de aíres acondicionados RECOVID-15-RFQ-NC / Contr Component 1: Emergency C atación de alimentación y loc OVID-19 response to preven Request for Quota Single Stage - One E al para el desarrollo de consu IBRD / 91000 Post Open - National 15,000.00 0.00 Canceled 2022-01-21 2022-03-30 2022-07-28 tion, detection and treatmen tions nvelope ltas de partes interesadas y t  poblaciones vulnerables RECOVID-DIR-105-NC / SERV Component 1: Emergency C ICIO DE CALL CENTER PARA L IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 418,530.00 418,530.00 Signed 2021-02-02 2021-02-11 2021-02-12 2021-02-12 2021-02-15 2021-02-16 2021-03-05 LAMADAS DE CONTENCIÓN D tion, detection and treatmen E LA PANDEMIA t  Page 6 RECOVID-DIR-110-NC / SERV ICIO DE ALQUILER DE 40 CA Component 1: Emergency C MIONES FURGON PARA LA DI OVID-19 response to preven STRIBUCION DE SUMINISTRO IBRD / 94290 Post Direct Selection Direct - National 597,645.00 597,645.00 Signed 2021-03-11 2021-04-13 2021-04-16 2021-04-16 2021-05-17 2021-05-18 2021-12-31 tion, detection and treatmen S, TRASLADO DE MOBILIARIO t  Y EQUIPO A LOS DIFERENTES CENTROS DE VACUNACIÓN Y OTROS. RECOVID-DIR-113-NC / SERV Component 1: Emergency C ICIO DE ALIMENTACION A DO OVID-19 response to preven MICILIO EN ZONA METROPOLI IBRD / 94290 Post Direct Selection Direct - National 96,884.24 96,884.24 Signed 2021-04-08 2021-04-09 2021-04-09 2021-04-09 2021-05-21 2021-05-22 2021-08-21 tion, detection and treatmen TANA PARA EL PERSONAL EN t  LOS AUTOSERVICIOS DE VAC UNACION PARA COVID-19 RECOVID-DIR-116-NC / CON Component 1: Emergency C TRATACION DE SERVICIOS D OVID-19 response to preven E SANITIZACION DE UNIDADE IBRD / 94290 Post Direct Selection Direct - National 530,545.04 530,545.04 Signed 2021-04-07 2021-04-19 2021-04-19 2021-04-19 2021-04-30 2021-05-01 2021-12-31 tion, detection and treatmen S DE TRANSPORTE DERIVAD t  OS PARA LA EMERGENCIA PO R COVID-19 RECOVID-DIR-118-NC / SERV ICIO DE ALIMENTACIÓN PARA Component 1: Emergency C EL PERSONAL DE SALUD DE L OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 194,929.00 474,722.08 Signed 2021-04-12 2021-06-16 2021-07-16 2021-07-16 2021-07-27 2021-08-06 2021-10-27 OS AUTOCENTROS DE VACU tion, detection and treatmen NACION Y EL MEGACENTRO t  DE VACUNACION DEL HOSPIT AL EL SALVADOR RECOVID-DIR-124-NC / SERV ICIO DE ALIMENTACIÓN A DO Component 1: Emergency C MICILIO EN ZONA METROPOLI OVID-19 response to preven IBRD / 94290 Post Direct Selection Direct - National 148,918.60 148,918.60 Signed 2021-10-27 2021-11-11 2021-11-01 2021-10-11 2021-12-22 2021-12-23 2022-02-22 TANA, MEGACENTRO DE VAC tion, detection and treatmen UNACION Y CENTRO NACION t  AL DE VACUNACION (CENABI ) RECOVID-DIR-125-NC / SERV Component 1: Emergency C ICIO DE CALL CENTER PARA IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 4,100,000.00 4,100,000.00 Signed 2021-09-03 2021-09-07 2021-09-08 2021-09-08 2021-09-16 2021-09-17 2021-12-31 EL SEM tion, detection and treatmen t  RECOVID-DIR-126-NC / SERV Component 1: Emergency C ICIO DE CALL CENTER PARA OVID-19 response to preven SEGUIMIENTO DE CASOS SOS IBRD / 94290 Post Direct Selection Direct - National 1,064,361.32 1,064,361.22 Signed 2021-11-08 2021-11-10 2021-11-10 2021-11-10 2021-11-12 2021-11-29 2022-02-22 tion, detection and treatmen PECHOSOS Y CONFIRMADOS t  POR COVID-19 A NIVEL NACI ONAL RECOVID-DIR-108-NC / CON Component 1: Emergency C TRATACIÓN DE SERVICIO DE OVID-19 response to preven CALL CENTER DE ATENCIÓN IBRD / 94290 Post Direct Selection Direct - National 1,064,361.32 1,064,361.32 Completed 2021-03-04 2021-03-12 2021-03-22 2021-03-19 2021-03-22 2021-04-01 2021-07-21 2021-09-05 tion, detection and treatmen DE LLAMADAS EN EL MARCO t  DE LA CONTENCIÓN DE LA P ANDEMIA COVID-19 RECOVID-DIR-129-NC / SERV ICIO DE TRANSPORTE PARA Component 1: Emergency C LA DISTRIBUCION DE VACUN OVID-19 response to preven AS, EQUIPO DE VACUNACION IBRD / 94290 Post Direct Selection Direct - National 808,515.00 0.00 Completed 2021-01-05 2021-02-01 2021-02-03 2021-02-03 2021-02-11 2021-12-31 2021-11-07 tion, detection and treatmen , KITS MEDICOS, INSUMOS Y t  PERSONAS A LAS DIFRENTES CENTROS DE VACUNACION Y OTROS PUNTOS GEOGRAFIC OS. RECOVID-DIR-130-NC / SERV Component 1: Emergency C ICIO DE LIMPIEZA DE BIOPRO OVID-19 response to preven TECCIÒN EN LOS ESTABLECI IBRD / 94290 Post Direct Selection Direct - National 1,283,599.32 0.00 Signed 2021-01-03 2021-03-01 2021-03-08 2021-03-08 2021-06-15 2021-12-31 tion, detection and treatmen MIENTOS DE LA RED NACION t  AL DE HOSPITALES DEL MINS AL. RECOVID-DIR-131-NC / SERV ICIO DE TRANSPORTE PARA L Component 1: Emergency C A DISTRIBUCIÓN DE VACUNA OVID-19 response to preven S, EQUIPO DE VACUNACION, IBRD / 94290 Post Direct Selection Direct - National 2,997,144.00 0.00 Signed 2021-05-12 2021-05-17 2021-05-19 2021-05-19 2021-05-31 2021-10-01 tion, detection and treatmen KITS MEDICOS, INSUMOS Y P t  ERSONAS A LOS DIFERENTES CENTROS DE VACUNACION Y OTROS PUNTOS GEOGRAFIC OS. RECOVID-DIR-133-NC / SERV Component 1: Emergency C ICIO DE LIMPIEZA DE BIOPRO IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 778,000.00 0.00 Completed 2021-08-12 2021-08-19 2021-10-22 2021-10-22 2021-12-10 2021-12-31 2022-06-06 TECCION tion, detection and treatmen t  RECOVID-DIR-141-NC / LICE Component 1: Emergency C NCIA DE ALOJAMIENTO EN LA IBRD / 94290 OVID-19 response to preven Post Direct Selection Direct - National 196,892.30 0.00 Completed 2021-01-19 2021-02-02 2021-02-08 2021-02-02 2021-03-03 2022-03-03 2022-06-12 NUBE tion, detection and treatmen t  RECOVID-17-RFQ-NC / Repro Component 1: Emergency C ducción de material educativ OVID-19 response to preven Request for Quota Single Stage - One E o para promover el sistema d IBRD / 91000 Post Open - National 55,000.00 0.00 Canceled 2022-01-19 2022-03-31 2022-06-29 tion, detection and treatmen tions nvelope e quejas y derechos de los us t  uarios de los servicios RECOVID-150-RFQ-NC / Mont aje, Impresión y Reproducció n de Rotafolio Educativo sobr Component 2. Project Manag Request for Quota Single Stage - One E Under Imple IBRD / 92290 Post Open - National 55,000.00 0.00 2023-01-18 2023-03-11 2023-04-25 e la temática de Mecanismo ement and Monitoring tions nvelope mentation de Insatisfacciones, dirigido a la Población Usuaria de los S ervicios de Salud. RECOVID-168-RFQ-NC / Serv icio de arrendamiento de fot Component 2. Project Manag Request for Quota Single Stage - One E Under Imple IBRD / 92290 Post Open - National 10,000.00 0.00 2023-03-01 2023-04-18 2023-12-31 ocopiadora e impresiones pa ement and Monitoring tions nvelope mentation ra apoyar la Gestión de la UG PPI RECOVID-169-RFQ-NC / SER VICIOS DE ALIMENTACION Y USO DE INSTALACIONES EN ZONA METROPOLITANA DE S Component 2. Project Manag Request for Quota Single Stage - One E Under Imple AN SALVADOR, PARA JORNAD IBRD / 92290 Post Open - National 10,000.00 0.00 2023-04-03 2023-05-19 2023-09-30 ement and Monitoring tions nvelope mentation AS DE SOCIALIZACIÓN DE A VANCES Y FORTALECIMIENTO DE RECURSOS HUMANOS EN CUMPLIMIENTO AL MARCO D E GESTIÓN AMBIENTAL Y SO CIAL Page 7 RECOVID-176-RFQ-NC / CON TRATACIÓN DE AGENCIA DE VIAJES PARA EL SERVICIO DE EMISIÓN DE BOLETOS AÉREO S, TARJETAS DE SEGURO DE Component 2. Project Manag Request for Quota Single Stage - One E Pending Impl IBRD / 92290 Post Open - National 12,000.00 0.00 2023-05-29 2023-06-09 2023-06-30 ASISTENCIA AL VIAJERO CON ement and Monitoring tions nvelope ementation COBERTURA INTERNACIONAL , ALOJAMIENTO Y TRASLADO PARA PERSONAL DE LA UNID AD DE GESTIÓN DE PROGRA MAS Y PROYECTOS DE INVER SIÓN EN CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RECOVID-18-QCBS-CS / Serv icios de consultoría para sup Component 1: Emergency C ervisión externa de conexos OVID-19 response to preven Quality And Cost- IBRD / 91000 Post Open - National 150,000.00 0.00 Canceled 2021-02-08 2021-03-01 2021-03-30 2021-04-27 2021-05-12 2021-05-26 2021-06-09 2022-01-10 relacionados a la adecuación tion, detection and treatmen Based Selection de la infraestructura para la i t  nstalación del equipo de res onancia magnética RECOVID-19-LCS-CS / Audito ría de estados financieros pa ra el periodo del 1 de enero a l 31 de diciembre 2021 del Pr Component 2. Project Manag Least Cost Selecti IBRD / 91000 Post Open - National 20,000.00 20,000.00 Signed 2022-01-13 2022-01-18 2022-01-13 2022-02-21 2022-01-28 2022-03-22 2022-02-02 2022-03-31 2022-02-07 2022-04-07 2022-02-15 2022-04-07 2022-02-28 2022-05-21 2022-05-31 oyecto de “Respuesta de Em ement and Monitoring on ergencia de El salvador ante el COVID-19” financiado por l os Contratos de Préstamo BI RF-9100-SV y BIRF-9229-SV RECOVID-93-CQS-CS / Contr atación de Auditoría de estad os financieros para el periodo del 1 de enero al 31 de dicie Component 2. Project Manag Consultant Qualifi Under Implement mbre 2022 del Proyecto de R IBRD / 92290 Post Open - National 40,000.00 0.00 2022-08-26 2022-10-04 2022-09-16 2022-10-31 2022-11-30 2023-01-04 2023-05-31 ement and Monitoring cation Selection ation espuesta de Emergencia de El salvador ante el COVID-19 ” financiado por los contratos de préstamo 9100-SV, 9229- SV y 9429-SV. RECOVID-20-LCS-CS / Audito Component 1: Emergency C Least Cost Selecti ria de los estados financieros IBRD / 91000 OVID-19 response to preven Post Open - National 23,000.00 0.00 Canceled 2022-10-10 2022-10-10 2022-11-09 2022-12-07 2022-12-21 2023-01-25 2023-02-22 2023-06-30 on correspondientes al año 202 tion, detection and treatmen 2 t  RECOVID-174-CQS-CS / Audi toría de estados financieros p ara el periodo del 1 de enero al 31 de diciembre 2023 del Component 2. Project Manag Consultant Qualifi Under Implement Proyecto de “Respuesta de E IBRD / 92290 Post Open - National 40,000.00 0.00 2023-05-18 2023-06-13 2023-06-08 2023-08-03 2023-09-04 2023-10-10 2024-05-04 ement and Monitoring cation Selection ation mergencia de El salvador ant e el COVID-19” financiado po r los Contratos de Préstamo BIRF-9100-SV, BIRF-9229-SV y BIRF 9429-SV INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RECOVID-23-INDV-CS / Cons ultoría Individual de Especiali sta Social en Apoyo al cumpli Component 1: Emergency C miento del Marco de Gestión OVID-19 response to preven Individual Consult IBRD / 91000 Post Open 41,600.00 41,600.00 Terminated 2021-08-16 2021-07-27 2021-08-29 2021-09-09 2021-09-01 2021-09-22 2021-10-02 2021-10-11 2023-01-25 Social de los Proyectos ejecu tion, detection and treatmen ant Selection tados en la UGPPI con financi t  amiento BIRF, con énfasis en el Proyecto “Respuesta de El Salvador ante el COVID-19 RECOVID-24-INDV-CS / Cons ultoría Individual de Especiali sta Ambiental en Apoyo al cu Component 1: Emergency C mplimiento del Marco de Ges OVID-19 response to preven Individual Consult IBRD / 91000 Post Open 41,600.00 41,600.00 Signed 2021-08-09 2021-08-26 2021-08-22 2021-10-06 2021-08-25 2021-10-06 2021-09-25 2021-11-04 2023-01-18 tión Ambiental de los Proyect tion, detection and treatmen ant Selection os ejecutados en la UGPPI co t  n financiamiento BIRF, con é nfasis en el Proyecto “Respu esta de El Salvador ante el C OVID-19” RECOVID-29-IND-CS / Servici o de consultoría para la supe Component 1: Emergency C rvisión del proyecto “suminis OVID-19 response to preven Individual Consult Pending Impleme tro, instalación y puesta en f IBRD / 91000 Post Open 17,500.00 0.00 2021-08-31 2021-10-19 2021-11-09 2022-01-04 2022-07-31 tion, detection and treatmen ant Selection ntation uncionamiento de equipos de t  la sala de angiógrafo y quiróf ano general del Hospital Naci onal El Salvador”. RECOVID-30-IND-CS / Servici o de consultoría para la supe Component 1: Emergency C rvisión del proyecto “suminis OVID-19 response to preven Individual Consult Pending Impleme tro, instalación y puesta en f IBRD / 91000 Post Open 17,500.00 0.00 2021-08-31 2021-10-19 2021-11-09 2022-01-04 2022-07-31 tion, detection and treatmen ant Selection ntation uncionamiento de equipos pa t  ra la central de esterilización y equipos del Hospital Nacion al El Salvador”. RECOVID-31-IND-CS / Servici o de consultoría para la supe Component 1: Emergency C rvisión del proyecto “suminis OVID-19 response to preven Individual Consult Pending Impleme tro, instalación y puesta en IBRD / 91000 Post Open 24,000.00 0.00 2021-08-31 2021-10-19 2021-11-09 2022-01-04 2022-07-31 tion, detection and treatmen ant Selection ntation marcha de equipos de unida t  d de radiología e imágenes di agnósticas para el Hospital N acional El Salvador Component 1: Emergency C RECOVID-22-INDV-CS / Espe Individual Consult IBRD / 91000 OVID-19 response to preven Post Open 52,500.00 0.00 Canceled 2021-02-15 2021-02-28 2021-03-03 2021-04-03 2022-12-31 cialista financiero ant Selection tion, detection and treatmen t  RECOVID-21-INDV-CS / Cons Component 1: Emergency C ultor(a) para adquisiciones y OVID-19 response to preven Individual Consult contrataciones del proyecto IBRD / 91000 Prior Open 33,600.00 33,600.00 Signed 2021-08-28 2021-09-07 2021-09-14 2021-09-13 2021-09-17 2021-11-30 2021-10-05 2021-10-11 2022-10-05 tion, detection and treatmen ant Selection de respuesta de El Salvador t  ante el COVID-19, y otros con financiamiento BIRF Page 8 RECOVID -46-INDV-CS / Serv icios de consultoría especiali Component 2. Project Manag Individual Consult Pending Impleme zada de ingeniería mecánica IBRD / 92290 Post Open 33,600.00 0.00 2022-01-07 2022-01-31 2022-02-04 2022-02-15 2023-02-15 ement and Monitoring ant Selection ntation en apoyo a la ejecución de lo s proyectos de infraestructur a RECOVID -47-INDV-CS / Serv icios de consultoría especiali Component 2. Project Manag Individual Consult Pending Impleme zada de ingeniería eléctrica e IBRD / 92290 Post Open 33,600.00 0.00 2022-01-07 2022-01-31 2022-02-04 2022-02-15 2023-02-15 ement and Monitoring ant Selection ntation n apoyo a la ejecución de los proyectos de infraestructura RECOVID -48-INDV-CS / Serv icios de consultoría especiali Component 2. Project Manag Individual Consult Pending Impleme zada de ingeniería hidrosanit IBRD / 92290 Post Open 33,600.00 0.00 2022-01-07 2022-01-31 2022-02-04 2022-02-15 2023-02-15 ement and Monitoring ant Selection ntation aria en apoyo a la ejecución de los proyectos de infraestr uctura RECOVID-42-CDS-CS / Consu ltoría en arquitectura y activi dades de dibujo técnico de in Component 2. Project Manag Individual Consult IBRD / 92290 Post Direct 27,600.00 27,600.00 Signed 2021-12-17 2022-01-03 2022-01-03 2022-01-07 2022-01-06 2022-01-18 2022-01-14 2022-02-07 2023-01-14 fraestructura financiados con ement and Monitoring ant Selection Unidad de Gestión de Progra mas y Proyectos De Inversión – UGPPI RECOVID-45-CDS-CS / Consu ltoría en arquitectura y activi dades de dibujo técnico de in Component 2. Project Manag Individual Consult IBRD / 92290 Post Direct 27,600.00 27,600.00 Signed 2021-12-17 2022-01-03 2022-01-03 2022-01-07 2022-01-06 2022-01-18 2022-01-14 2022-02-07 2023-01-14 fraestructura financiados con ement and Monitoring ant Selection Unidad de Gestión de Progra mas y Proyectos De Inversión – UGPPI RECOVID-43-CDS-CS / Consu ltoría en arquitectura y activi dades de dibujo técnico de in Component 2. Project Manag Individual Consult IBRD / 92290 Post Direct 27,600.00 27,600.00 Signed 2021-12-17 2022-01-03 2022-01-03 2022-01-07 2022-01-06 2022-01-18 2022-01-14 2022-02-07 2023-01-14 fraestructura financiados con ement and Monitoring ant Selection Unidad de Gestión de Progra mas y Proyectos De Inversión – UGPPI RECOVID-44-CDS-CS / Consu ltoría en arquitectura y activi dades de dibujo técnico de in Component 2. Project Manag Individual Consult IBRD / 92290 Post Direct 27,600.00 27,600.00 Signed 2021-12-17 2022-01-03 2022-01-03 2022-01-07 2022-01-06 2022-01-18 2022-01-14 2022-02-07 2023-01-14 fraestructura financiados con ement and Monitoring ant Selection Unidad de Gestión de Progra mas y Proyectos De Inversión – UGPPI RECOVID-50-INDV-CS / Cons ultoría individual para especi alista de adquisiciones y cont Component 2. Project Manag Individual Consult IBRD / 92290 Prior Open 39,200.00 33,600.00 Signed 2022-01-10 2022-03-10 2022-01-20 2022-04-21 2022-01-27 2022-04-25 2022-02-01 2022-05-07 2023-03-31 rataciones del proyecto de re ement and Monitoring ant Selection spuesta de El Salvador ante el COVID-19, y otros con fina nciamiento BIRF RECOVID-51-INDV-CS / Contr atación de consultores para f ormulación de carpetas técni Component 2. Project Manag Individual Consult IBRD / 92290 Post Open 120,000.00 0.00 Signed 2022-02-07 2022-06-13 2022-03-05 2022-09-01 2022-03-18 2022-09-02 2022-04-08 2022-07-07 cas para el mejoramiento del ement and Monitoring ant Selection sistema eléctrico de los hospi tales nacionales priorizados RECOVID-52-INDV-CS / Servi cios de consultoría par avalú Component 2. Project Manag Individual Consult os técnicos de los bienes inm IBRD / 92290 Post Open 100,000.00 75,000.00 Signed 2022-02-14 2022-03-17 2022-03-14 2022-06-07 2022-03-21 2022-06-07 2022-04-12 2022-06-24 2022-06-11 ement and Monitoring ant Selection uebles propiedad del Minister io de Salud en hospitales na cionales priorizados. RECOVID-60-RFQ-CS / Servic Component 2. Project Manag Individual Consult ios de consultoría de especial IBRD / 92290 Prior Open 36,000.00 0.00 Canceled 2022-03-21 2022-03-28 2022-04-18 2022-05-23 2023-05-23 ement and Monitoring ant Selection ista en adquisiciones para ap oyar la UGPPI RECOVID-60-IND-CS / Servici Component 2. Project Manag Individual Consult os de consultoría de especiali IBRD / 92290 Prior Open 36,000.00 33,600.00 Signed 2022-04-04 2022-05-24 2022-04-18 2022-06-13 2022-05-02 2022-06-30 2022-05-13 2022-07-14 2022-12-31 ement and Monitoring ant Selection sta en adquisiciones para ap oyar la UGPPI RECOVID-70-INDV-CS / Servi cios de consultoría para aval Component 2. Project Manag Individual Consult úos técnicos de los bienes in IBRD / 92290 Post Open 100,000.00 0.00 Signed 2022-04-28 2022-06-27 2022-05-30 2022-10-24 2022-06-09 2022-10-25 2022-07-06 2022-11-03 ement and Monitoring ant Selection muebles propiedad del Minist erio de Salud en Hospitales N acionales Priorizados RECOVID-94-CDS-CS / CONS ULTORÍA INDIVIDUAL PARA E SPECIALISTA EN ADQUISICIO Component 2. Project Manag NES Y CONTRATACIONES DEL IBRD / 92290 Post Direct Selection Direct - National 42,000.00 0.00 Signed 2022-09-09 2022-09-12 2022-09-18 2022-09-28 2022-09-30 2023-12-31 ement and Monitoring PROYECTO DE RESPUESTA D E EL SALVADOR ANTE EL CO VID-19, Y OTROS CON FINACI AMIENTO BIRF RECOVID-98-INDV-CS / Cons ultoría Individual de Especiali sta Social en Apoyo al Cumpli miento del Marco de Gestión Component 2. Project Manag Individual Consult Under Implement IBRD / 92290 Post Open - National 39,000.00 0.00 2022-09-16 2022-11-14 2022-09-30 2023-01-09 2022-10-10 2023-01-12 2022-10-24 2023-12-31 Social de los proyectos ejecu ement and Monitoring ant Selection ation tados en la UGPPI con financi amiento BIRF, con énfasis en el Proyecto "Respuesta de El Salvador ante el COVID-19" RECOVID-136-INDV-CS / CO NSULTORÍA INDIVIDUAL PAR A ESPECIALISTA EN ADQUISIC Component 2. Project Manag Individual Consult IONES Y CONTRATACIONES D IBRD / 92290 Prior Open - National 39,200.00 0.00 Canceled 2022-10-14 2022-10-29 2022-11-03 2022-11-17 2023-12-31 ement and Monitoring ant Selection EL PROYECTO DE RESPUESTA DE EL SALVADOR ANTE EL C OVID-19, Y OTROS CON FINA CIAMIENTO BIRF RECOVID-137-INDV-CS / SER VICIO DE CONSULTORÍA PAR Component 2. Project Manag Individual Consult A APOYO JURÍDICO EN UNIDA IBRD / 92290 Prior Open - National 39,200.00 0.00 Canceled 2022-10-14 2022-10-25 2022-10-27 2022-11-03 2022-11-17 2023-12-31 ement and Monitoring ant Selection D DE ADQUISICIONES Y CON TRATACIONES DE LA UGPPI Page 9 RECOVID-144-CDS-CS / CON SULTORÍA INDIVIDUAL PARA ESPECIALISTA EN ADQUISICI Component 2. Project Manag ONES Y CONTRATACIONES D IBRD / 92290 Prior Direct Selection Direct - National 39,200.00 0.00 Signed 2022-10-18 2022-10-21 2022-10-26 2022-11-03 2022-11-10 2023-12-31 ement and Monitoring EL PROYECTO DE RESPUESTA DE EL SALVADOR ANTE EL C OVID-19, Y OTROS CON FINA CIAMIENTO BIRF RECOVID-152-CDS-CS / SER VICIOS DE CONSULTORIA EN ARQUITECTURA Y ACTIVIDAD Component 2. Project Manag ES DE DIBUJO TECNICO DE IN IBRD / 92290 Post Direct Selection Direct - National 25,300.00 0.00 Signed 2022-12-23 2023-01-20 2023-01-09 2023-01-20 2023-01-25 2023-12-31 ement and Monitoring FRAESTRUCTURA FINANCIAD OS CON UNIDAD DE GESTION DE PROGRAMAS Y PROYECTO S DE INVERSION - UGPPI RECOVID-153-CDS-CS / SER VICIOS DE CONSULTORIA EN ARQUITECTURA Y ACTIVIDAD Component 2. Project Manag Under Implement ES DE DIBUJO TECNICO DE IN IBRD / 92290 Post Direct Selection Direct - National 25,300.00 0.00 2022-12-23 2023-01-10 2023-01-09 2023-01-20 2023-01-25 2023-12-31 ement and Monitoring ation FRAESTRUCTURA FINANCIAD OS CON UNIDAD DE GESTION DE PROGRAMAS Y PROYECTO S DE INVERSION - UGPPI RECOVID-154-CDS-CS / SER VICIOS DE CONSULTORIA EN ARQUITECTURA Y ACTIVIDAD Component 2. Project Manag Under Implement ES DE DIBUJO TECNICO DE IN IBRD / 92290 Post Direct Selection Direct - National 25,300.00 0.00 2022-12-23 2023-01-10 2023-01-09 2023-01-20 2023-01-25 2023-12-31 ement and Monitoring ation FRAESTRUCTURA FINANCIAD OS CON UNIDAD DE GESTION DE PROGRAMAS Y PROYECTO S DE INVERSION - UGPPI RECOVID-155-CDS-CS / SER VICIOS DE CONSULTORIA EN ARQUITECTURA Y ACTIVIDAD Component 2. Project Manag ES DE DIBUJO TECNICO DE IN IBRD / 92290 Post Direct Selection Direct - National 25,300.00 0.00 Signed 2022-12-23 2023-01-10 2023-01-09 2023-01-23 2023-01-25 2023-12-31 ement and Monitoring FRAESTRUCTURA FINANCIAD OS CON UNIDAD DE GESTION DE PROGRAMAS Y PROYECTO S DE INVERSION - UGPPI RECOVID-160-CDS-CS / Cons ultoría Individual de Especiali sta Ambiental en Apoyo al cu mplimiento del Marco de Ges Component 2. Project Manag IBRD / 92290 Post Direct Selection Direct - National 26,588.00 0.00 Signed 2023-01-31 2023-02-10 2023-02-10 2023-02-24 2023-02-25 2023-12-31 tión Ambiental de los Proyect ement and Monitoring os ejecutados en la UGPPI co n financiamiento BIRF, con é nfasis en el Proyecto “Respu esta de El Salvador ante el C OVID-19. RECOVID-164-INDV-CS / Ser vicios de Consultoría para Ap Component 2. Project Manag Individual Consult IBRD / 92290 Prior Open - National 28,000.00 0.00 Signed 2023-02-08 2023-02-07 2023-02-20 2023-02-21 2023-02-24 2023-02-23 2023-03-01 2023-12-31 oyo Jurídico en Unidad de Ad ement and Monitoring ant Selection quisiciones y Contartaciones de la UGPPI RECOVID-170-INDV-CS / Con tratación de servicios de con Component 2. Project Manag Individual Consult Pending Impleme sultoría individual para el fort IBRD / 92290 Post Open - National 45,000.00 0.00 2023-03-31 2023-05-04 2023-05-19 2023-06-13 2023-09-11 ement and Monitoring ant Selection ntation alecimiento de la Dirección d e Tecnologías de la Informaci ón y Comunicación RECOVID-171-CDS-CS / Cons ultoría Individual para Especi alista en Adquisiciones y Con Component 2. Project Manag IBRD / 92290 Prior Direct Selection Direct - National 22,774.00 0.00 Signed 2023-03-24 2023-04-13 2023-04-03 2023-04-17 2023-04-27 2023-12-31 tratación del Proyecto de Res ement and Monitoring puesta de El Salvador ante el COVID-19 y otros con financi amiento BIRF RECOVID-172-CDS-CS / Cons ultoría Individual para Especi alista en Adquisiciones y Con Component 2. Project Manag Under Implement IBRD / 92290 Prior Direct Selection Direct - National 16,530.00 0.00 2023-04-14 2023-04-13 2023-05-03 2023-05-15 2023-07-04 2023-12-31 tratación del Proyecto de Res ement and Monitoring ation puesta de El Salvador ante el COVID-19 y otros con financi amiento BIRF Page 10 Stratégie de Passation des Marchés pour la composante Assistance Technique du Programme axé sur les résultats pour Le Renforcement du Système Educatif Primaire (PPSD du PRSEP - AT) Table des matières SIGLES ET ACRONYMES ............................................................................................................2 RÉSUMÉ DU PPSD POUR LE PAD .............................................................................................4 1 Aperçu du projet................................................................................................................5 1.1 Description du Projet : ....................................................................................................5 2 Aperçu du Pays, de l’Emprunteur et du Marché ..........................................................9 2.1 Présentation sommaire du pays, de l’emprunteur et du marché ...................................9 2.1.1 Contexte opérationnel .............................................................................................9 3 Évaluation de l’expérience antérieure, de la capacité de l’Emprunteur et de l’Unité de Gestion du Projet (UGP) ...................................................................................................14 3.1 Expérience....................................................................................................................14 3.2 Capacités et aptitudes pour la gestion des contrats ....................................................16 3.3 Systèmes de gestion des plaintes et de résolution de conflits .....................................16 3.4 Conclusions clés ...........................................................................................................17 4 Analyse du marché..........................................................................................................17 4.1 Dynamique du secteur du marché ...............................................................................17 4.2 Tendances en matière d’approvisionnement ...............................................................18 4.3 Conclusions clés ...........................................................................................................18 4.4 Analyse SWOT ..............................................................................................................19 4.5 Analyse des risques liés à la passation des marchés ...................................................20 5 Objectifs de la Passation des marchés ........................................................................21 5.1 Approche de la passation des marchés recommandée pour le Projet : ........................21 Project Procurement Strategy for Development 1 SIGLES ET ACRONYMES AMI Avis à Manifestation d’Intérêt ANRMP Autorité Nationale de Régulation des Marchés Publics AT Assistance Technique AVI Agent de Vérification Independent BCPENA Bureau de Coordination des Projets de l’Education Nationale et de l’Alphabétisation Bm Banque mondiale CGES Cadre de Gestion Environnementale et Sociale CI Côte d’Ivoire COP Contrat d’Objectifs et de Performance CoPil Comité de Pilotage CoTech Comité Technique CMP Code des Marchés Publics CPM Cellules de Passation des Marchés CPR Cadre de Politique de Réinstallation CPP Cadre de Partenariat Pays DAAJE Direction de l’Alphabétisation des Adultes, Jeunes et Enfants DAPS-COGES Direction de l’Animation, de la Promotion et du Suivi des Comités de Gestions des Etablissements Scolaires DAF Direction des Affaires Financières DC Demande de Cotations DCSPA Direction de la Coordination et du Suivi des Programmes d’Alphabétisation DENF Direction de l’Education Non-Formelle DELC Direction des Ecoles, Lycées et Collèges DGMP Direction Générale des Marchés Publics DPFC Direction de la Pédagogique et de la Formation Continue DMDA Direction des Matériels Didactiques de l’Alphabétisation DR Domaine de Résultats DSPS Direction de la Stratégie, de la Planification et des Statistiques EGENA Etats Généraux de l’Education Nationale et de l’Alphabétisation FPI Financement de Projet d’Investissement ILD ou DLI Indicateur Lié au Decaisement IPF Investment Project Financing MENA Ministère de l’Economie et des Finances MI Manifestation d’Intérêt PAP Plan d’Action du Programme (PAP) PAPSE Projet d’Amélioration de la Prestation de Services Educatifs PforR Programme de Financement basé sur les Résultats PNAPAS Programme National d’Appui aux Premiers Apprentissages PPM Plan de Passation des Marchés PPSD Project Procurement Strategy for Developpement PRSEP Programme axé sur les Résultats pour le Renforcement du Système Educatif Primaire PASEF Projet d’Appui au Secteur Education Formation PTF Partenaires Techniques et Financiers PUAEB Projet d’Urgence et d’Appui à l’Education de Base Project Procurement Strategy for Development 2 SAC un Secrétariat d’Appui et de Coordination SCBD Sélection dans le Cadre d'un Budget Déterminé SQC Sélection Fondée sur les Qualifications du Consultant SD Sélection Directe SFQ Sélection Fondée sur la Qualité du Consultant SFQC Sélection Fondée sur la Qualité et sur le Coût SIGMAP Système Intégré de Gestion des Marchés Publics SMC Sélection au Moindre Coût STEP Systematic Tracking of Exchanges in Procurement SWOT Strengths, Weaknesses, Opportunities and Threats (Force, Faiblesses, Opportunités et Menances) UEMOA Union Economique et Monétaire Ouest Africain UGP Unité de Gestion du Projet Project Procurement Strategy for Development 3 RÉSUMÉ DU PPSD POUR LE PAD Le coût total de la Composante Financement du Projet d’investissement (FPI) du Programme axé sur les Résultats pour le Renforcement du Système Educatif Primaire (PRSEP) P177800 est estimé à 20 millions 300 mille de dollars US pour cinq années. L’ensemble des marchés identifiés à ce stade à inscrire au plan de passation des marchés sont au nombre de 63 pour un montant total de 5 163 464 USD, reparti par ordre d’importance comme suit : - 37 marchés de services de Consultants représentant 73 % du montant des marchés ; - 14 marchés de Fournitures, représentant 17 % du montant total des marchés, et ; - 12 marchés de Services Assimilés, représentant 10 % du montant total des marchés. Pour les 18 premiers mois, le Plan de Passation des Marchés comportera 56 marchés dont 36 marchés de Services de Consultants, 12 marchés de Services Assimilés et 8 marchés de Fournitures. Ces marchés ne présentent aucun caractère particulier et ne sont pas d’une grande complexité. L’analyse de l’ensemble des marchés permet de comprendre qu’il existe sur le plan national, régional et international, plusieurs consultants individuels compétents ou firmes spécialisées qui pourraient être intéressés. De même, sur le marché, il y a une large gamme de fournisseurs pour répondre aux besoins de l’UGP/BCPENA. Aussi, pour optimiser les marchés, l’UGP/BCPENA pourra, si besoin était, passer par des Avis à Manifestation d’Intérêt pour identifier les entreprises ou Consultants intéressés à participer aux processus de passation des marchés. Le PPSD sera mis à jour si la nature des marchés ou les risques liés à certains marchés subissent des changements majeurs qui n’avaient pu être anticipés lors de l’élaboration du présent PPSD. Quant à l’environnement, il est relativement favorable mais présente des défis pour lesquels des dispositions pour les mitiger ont été identifiées. L’évaluation de la capacité de la Cellule Passation des marchés (CPM) de l’UGP PAPSE qui intègrera le Bureau de Coordination des Projet de l’Education Nationale et de l’Alphabétisation (BCPENA) montre qu’elle a une bonne expérience des procédures de passation des marchés de la Banque mondiale. En effet, la CPM de l’UGP du PAPSE comporte en son sein un (1) Spécialiste Senior en Passation des Marchés avec une expérience (nationale et internationale) de plus de 20 ans dans le domaine de la passation des marchés. La CPM comporte également deux (2) Assistants en Passation des marchés et une (1) Assistante Archiviste pour l’archivage électronique des documents de la passation des marchés du Projet. Toutefois, cette cellule aura besoin d’un renforcement des capacités sur le module Gestion des contrats nouvellement intégré à STEP pour une bonne prise en main de cet aspect. Au regard, de l’analyse du marché et des stratégies de passation de marchés, tenant compte du contexte de mise en œuvre des interventions ainsi que de la capacité de l’unité de gestion, le risque du projet est jugé modéré. Project Procurement Strategy for Development 4 1 Aperçu du projet Pays : République de Côte d'Ivoire Programme Axé Sur Les Résultats pour Le Renforcement Du Nom complet du projet : Systeme Educatif Primaire Montant total du 364,700,000 USD dont 20,300,000 USD en financement financement (Dollars) : d’investissement Numéro identifiant du P177800 projet : L’objectif de développement du Programme est d’améliorer i) Résumé des Objectifs de l'accès équitable aux services d’éducation et de santé au développement du préscolaire et au primaire ; ii) les résultats d’apprentissage ; et Projet iii) la gestion axée sur la performance le long de la chaîne de prestation de services éducatifs. Le présent document PPSD1 a été élaboré sur la base d'informations sur la composante Assistance Technique (AT) du programme issue du PRSEP (Rapport n° : PAD4948). Une liste des marchés/activités de la composante AT a été établie et a permis de réaliser les analyses de risques et stratégiques préalables à l'élaboration du présent document. Par ailleurs, les expériences de l’unité de gestion du PAPSE ont constitué une base de référence pour la formulation des analyses et mesures figurant dans le présent PPSD. 1.1 Description du Projet : Le programme PforR proposé vise à contribuer au développement du capital humain en développant les services éducatifs et de santé et en améliorant la qualité de l'apprentissage au préscolaire et primaire. Il s'inscrit dans le cadre du Cadre de partenariat pays (CPP) 2016-2021 2 notamment dans les domaines d'intervention 2 et 3, qui portent sur : (i) le renforcement du capital humain pour le développement économique et la cohésion sociale et (ii) le renforcement de la gestion des finances publiques et de la redevabilité. Il participera également à l'amélioration de la gestion des finances publiques et de la redevabilité en appuyant les mécanismes d’établissement de rapport tout au long de la chaîne de prestations de l'éducation. Le Programme visera à : (i) réduire la pauvreté et les inégalités en offrant la possibilité aux enfants de bénéficier d'une éducation de qualité pour une meilleure réussite scolaire ; et (ii) renforcer la redevabilité en soutenant des contrats d’objectifs et de performance pour une prestation de services éducatifs plus efficace. L’objectif de développement du Programme est d’améliorer i) l'accès équitable aux services d’éducation et de santé au préscolaire et au primaire ; ii) les résultats d’apprentissage ; et iii) la gestion axée sur la performance le long de la chaîne de prestation de services éducatifs. Aussi, le programme est structuré autour de trois (3) domaines de résultats (DR) : (DR1) Amélioration de l’accès et de l’équité, (DR2) Amélioration de la qualité et de l’efficacité, et (DR3) Amélioration de la gouvernance. 1Le Project Procurement Strategy for Development (PPSD) est un nouveau cadre de passation de marchés publics adopté par la Banque mondiale et en vigueur depuis le 1er juillet 2016. 2Rapport n° 96515-CI. Alors que le PCF couvrait initialement la période allant de l'exercice 16 à l'exercice 19, il a été décidé de le prolonger jusqu'à l'exercice 21 lors du DPP de mai 2018. Le CPF a été approuvé le 17 août 2015 Project Procurement Strategy for Development 5 Le financement comporte outre le Programme PforR, une composante Financement de Projet d’Investissement (FPI). La composante Financement de Projet d’Investissement (FPI) fournira un soutien stratégique aux structures du Ministère de l’Education Nationale et de l’Alphabétisation (MENA) et financera les aspects clés qui permettront au Bureau de Coordination des Programme de l’Education Nationale et de l’Alphabétisation (BCPENA) de coordonner la mise en œuvre du Programme (20 millions de dollars) : (i) La composante FPI fournira une AT pour soutenir le développement des aspects clés du système lié à l’accès à l’éducation. L'AT sera fournie aux directions suivantes : Direction de la Coordination et du Suivi des Programmes d’Alphabétisation (DCSPA), Direction de l’Alphabétisation des Adultes, Jeunes et Enfants (DAAJE), Direction des Matériels Didactiques de l’Alphabétisation (DMDA), Direction de l’Education Non-Formelle (DENF), Direction de la Stratégie, de la Planification et des Statistiques-(DSPS), Direction de l’Animation, de la Promotion et du Suivi des Comités de Gestions des Etablissements Scolaires, (DAPS-COGES), Direction de la Coordination et de l’Exécution des Projets, (DCEP) Direction des Ecoles, Lycées et Collèges, (DELC). Plus précisément, l'AT sera utilisée pour : o Concevoir un programme d’alphabétisation familiale qui intégrera les d’acquisitions des compétences des bases et de sensibilisation à l’importance de la nutrition, du développement cognitif du jeune enfant, des violences basées sur le genre et qui facilitera l’autonomisation des apprenants (et notamment les jeunes mères de famille). Elle financera le recrutement d’experts spécialistes en alphabétisation familiale et s’appuiera sur une capitalisation des expériences, outils et mécanismes développés dans le cadre du Projet multisectoriel de nutrition et de développement de la petite enfance ainsi que sur le projet PAPSE concernant l’information / sensibilisation sur les violences basées sur le genre. o Renforcer l’outil carte scolaire en s’inspirant d’outils déjà testés en Côte d’Ivoire - notamment l’expérience de la HeatMap - dans le cadre de projets financés par des Partenaires Techniques et Financiers tout en gardant à l’esprit que les améliorations apportées devront pouvoir être intégrées au prochain SIGE. L’outil actuel, qui s’appuie sur des bases solides, pourrait être amélioré. La composante appuiera ces améliorations pour permettre (a) des mises à jour en temps réel, (b) l’intégration de données supplémentaires permettant une meilleure priorisation des localités bénéficiant de la construction d’écoles dans une perspective d’équité et (c) une planification triennale. o Soutenir la DCSPA pour l’actualisation de la stratégie nationale d'alphabétisation et de l’éducation non-formelle. (ii) La composante FPI fournira une AT pour soutenir le développement du PNAPAS et du paquet d’intrants pédagogiques qui l’accompagne. L'AT sera fournie à la Direction de la Pédagogique et de la Formation Continue (DPFC). Plus précisément, l'AT sera utilisée pour: o finaliser le PNAPAS et développer son plan opérationnel de mise en œuvre et de suivi. o finaliser le paquet d’intrants pédagogiques associés au PNAPAS et notamment (i) la finalisation / ajustement du paquet d’outils pour le CP1, CP2, CE1 et CE2 déjà testés dans le cadre de projets pilotes mais qui nécessite quelques ajustements avant une mise à l’échelle et le développement complet du paquet d’outil pour le CM1 et le CM2, (ii) l'ajustement des outils de remédiation qui ont été développés en utilisant l'approche TARL (Teaching at the Right Level). (iii)La composante FPI fournira une AT pour soutenir les efforts du MENA vers une meilleure gestion du secteur. L'AT sera fournie principalement à la Direction des Affaires Financières (DAF), à l’inspection générale et à la Task Force. Plus précisément, l'AT sera utilisée pour : o institutionnaliser le nouveau secrétariat d’appui et de coordination (manuel de procédures, PTAB…) y compris dans sa dimension recherche-action au travers de Project Procurement Strategy for Development 6 l’initiative EdLab ainsi que sa fonction de plaidoyer pour une mobilisation des ressources auprès des partenaires ; o compléter le mécanisme institutionnel des COPs ; o fournir un soutien à la Task Force pour assurer la supervision stratégique du programme au sein d'un comité de pilotage élargi, coordonner et suivre les politiques et les plans stratégiques du secteur, diriger le dialogue sectoriel et organiser les examens sectoriels annuels ; o appuyer la DAF à la mise en place d’un mécanisme de contrôle de gestion des directions techniques et régionales ; o appuyer le MENA à développer des stratégies pertinentes, à l'exception de la stratégie d'éducation inclusive et de la stratégie de formation des enseignants déjà prévues dans le cadre des résultats du programme. Ces stratégies pertinentes peuvent inclure une stratégie linguistique et une stratégie d'enseignement à distance et d'utilisation des nouvelles technologies pour l'enseignement ; o appuyer le MENA pour la diffusion et la communication sur les recommandations des EGENA ; o appuyer le MENA à développer de manières participative et inclusive des stratégies et études pertinentes (à l'exception de la stratégie d'éducation inclusive et de la stratégie de formation des enseignants déjà prévues dans le cadre des résultats du programme). Ces études ou stratégies porteront sur :  la politique linguistique ;  la stratégie d'enseignement à distance et l'utilisation des nouvelles technologies pour l'enseignement ;  la vision stratégique SNAPAS ;  le rapport de suivi de la mise en œuvre du PNAPAS (après minimum 2 années de mise en œuvre) ;  le rapport de suivi de la mise en œuvre de la stratégie nationale de formation ;  le rapport de suivi de la mise en œuvre des COP ;  les études sur les Indicateurs de Prestation de Services ;  la mise à jour de la stratégie d’alphabétisation ;  la politique du livre ;  le code de l’éducation ;  le référentiel des métiers et des compétences actualisé ;  la faisabilité et les options pour la mise en œuvre de fonds commun pour l’éducation. La composante FPI soutiendra les coûts de fonctionnement et le renforcement des capacités de gestion du BCPENA. Cela comprend le recrutement de consultants pour remplir les fonctions de gestion fiduciaire et de sauvegardes environnementales et sociales telles qu’identifiées dans le Plan d’Action du Programme (PAP) ; le soutien au développement d'un manuel d’opérations du Programme ; le suivi / évaluation du Programme (incluant des sondages auprès des bénéficiaires du Programme par l’intermédiaire d’appels d’un centre d’appel ou équivalent) et le recrutement de l'agent de vérification indépendant (AVI) qui vérifiera les réalisations des ILD du PforR. Activité d’Assistance Technique par domaine de résultat du programme Project Procurement Strategy for Development 7 Domaine de Résultat 1 Domaine de Résultat 2 Domaine de Résultat 3 FPI (i) Soutenir les coûts de fonctionnement du BCPENA (ii) Recruter un agent de vérification indépendante (iii)Renforcer le suivi et l’évaluation en soutenant le développement du manuel de suivi et d’évaluation • Appui à la conception d’un • Accompagnement des • Soutien à module d’alphabétisation équipes MENA à finaliser l’institutionnalisation du familiale intégrant le PNAPAS et ajuster le secrétariat d’appui et de l’acquisition de paquet d’intrants coordination compétences de base, la pédagogique qui y est • Soutien à la Task Force sensibilisation à la nutrition, rattaché au développement cognitif • Soutien à la DAF pour la du jeune enfant et aux mise en place d’un violences basées sur le mécanisme de contrôle genre de gestion des directions techniques et régionales • Soutien à la mise à jour de la stratégie nationale • Soutien à la finalisation d’alphabétisation et du mécanisme d’éducation non formelle institutionnel des COP • Appui au renforcement de • Appui au développement l’outil carte scolaire en de stratégies pertinentes intégrant des interfaces additionnelles PforR • ILD 1 : Les élèves et les • ILD 4 : Le Programme • ILD 7 : La planification et COGES des zones National d'Amélioration le suivi au sein du MENA vulnérables bénéficient d’un des Premiers sont renforcés paquet d’appui favorable à Apprentissages est mis • ILD 8 : La réforme de la la santé, à la nutrition et au en œuvre dans toute la régionalisation du développement cognitif du Côte d’Ivoire recrutement est mise en jeune enfant • ILD 5 : Les capacités des œuvre • ILD 2 : L’accès à enseignants à • ILD 9 : Les Contrats l’apprentissage est facilité s’approprier les d’Objectifs et de par un dispositif de nouvelles approches Performances sont mis construction élargi et basé pédagogiques sont en œuvre sur un outil carte scolaire renforcées amélioré • • ILD 6 : Les résultats • ILD 3 : MENA a apporté son d'apprentissage des soutien aux élèves dans le élèves de CE1 sont cadre de sa politique améliorés en d'éducation inclusive. lecture/écriture et mathématiques Les activités prévues pendant l’exécution de l’assistance technique sont essentiellement les suivantes : - Le recrutement et le financement d’experts internationaux et nationaux pour accompagner (renforcement des capacités et des compétences) les structures du MENA; - le recrutement et le financement de facilitateurs communautaires alphabétisation Project Procurement Strategy for Development 8 - le recrutement et le financement de Consultants (individuel et moral) pour réaliser des études ou des évaluations ; - la Réalisation d’études; - le Recrutement des membres de l’équipe de gestion au niveau du UGP/BCPENA; - le financement de formations. 2 Aperçu du Pays, de l’Emprunteur et du Marché 2.1 Présentation sommaire du pays, de l’emprunteur et du marché 2.1.1 Contexte opérationnel 2.1.1.1 Aspects sur la gouvernance : De nombreux efforts ont été fait ces dernières années pour l’amélioration de la gouvernance en Côte d’Ivoire, ce qui justifie son classement pour l’indice MO Ibrahim pour la bonne gouvernance au 18ème rang au titre de l’année 2019, contre le 22ème rang en 2018 soit une progression en matière de gouvernance de +4 . Sur le plan règlementaire, il existe de nombreux textes relatifs aux marchés publics. Notons que ces dispositions règlementaires nationales ne s’appliqueront qu’au Programme PforR et non à la Composante FPI. Certains de ces textes sont : - les Directives N°05/2005/CM/UEMO et N°05/2005/CM/UEMOA de l’UEMOA ; - le Code Marches Publics Ordonnance n°2019-679 du 24 juillet 2019. qui régi globalement la Passation des Marchés ; - les textes de la régulation des marchés publics, principalement le Décret N°2009-260 du 6 Août 2009 portant organisation et fonctionnement de l’Autorité Nationale de Régulation des Marchés Publics (ANRMP) tel que modifié par le décret 2013-308 du 8 mai 2013 et l’Arrêté N° 661/MEF/ANRMP du 14 septembre 2010 fixant les modalités de saisine, les procédures d’instruction et de décision de la Cellule recours et sanctions de l’Autorité Nationale de Régulation des Marchés Publics ; - les Arrêtés N°106/MEF du 13 juillet 2011, N°118/MPMB du 26 mars 2014, N°692/MPMB/DGBF/DMP du 16 septembre 2015 et le N°693/MPMB/DGBF/DMP du 16 septembre 2015, portant respectivement Code de déontologie en matière de marchés publics et délégation de service public, modalités d’application des sanctions des violation de la règlementation des marchés publics, fixation des seuils de référence, de validation et d’approbation dans la procédure de passation des marchés publics et, procédures concurrentielles simplifiées. A cela l’on pourrait ajouter la charte d’Ethique des acteurs publics des marchés publics ; - enfin, dans le cas spécifique des projets et programmes financés ou cofinancés par les Partenaires Techniques et Financiers (PTF), le cadre de référence est celui du décret n°475 du 1er Juillet 2015 (notamment dans son article 47). Ce décret a pour objet de déterminer les règles spécifiques régissant la préparation, l’exécution et la clôture des projets et programmes financés ou cofinancés par les PTF. Dans ce cadre institutionnel, il est également décrit les interventions de chaque acteur clé : les Cellules d’exécution de projets, les Ministères techniques, les Ministères en charge de l’économie, des finances et du budget. Le Programme PforR PRSEP est conduit sous l'égide du Ministère de l’Economie et des Finances (MEF). La tutelle technique du projet est sous la responsabilité du MENA. Les acteurs du Programme sont : Project Procurement Strategy for Development 9 - le MENA, le MEF, le Ministère du Budget et du Portefeuille de l’Etat (MBPE) ; - Les structures centrales et déconcentrées en région du MENA ; - Les communautés éducatives locales (familles et corps enseignant) à travers les Comités de Gestion des Établissements Scolaires (COGES); - Les bénéficiaires directs du programme (élèves, enseignants, parents d’élèves, etc ). Quant à la Composante IPF ou Assistance Technique, ce sont les procédures de passation de marchés de la Banque mondiale qui s’appliqueront. De manière pratique, tous les achats effectués dans le cadre de l’Assistance technique se feront suivant les dispositions du Règlement de passation des marchés pour les Emprunteurs sollicitant le financement de projets d’investissement de juillet 2016 révisé en novembre 2017, août 2018 et novembre 2020. Il s’agira des acquisitions liées au fonctionnement et au renforcement des capacités de gestion de l’UGP/BCPENA, du recrutement de consultants, de services autres que services de consultants pour assurer l’assistance technique aux différentes structures du MENA. Le cadre institutionnel du Programme s'articule autour des fonctions suivantes : - un Secrétariat d’Appui et de Coordination (SAC) sera mis en place en tant qu'organe d'appui et de coordination. Dans le cadre de la mise en œuvre du Programme, il devra, entre autres, (i) superviser l'élaboration des plans d'action par les structures d'exécution (principalement les directions techniques) et s'assurer que les activités sont mises en œuvre conformément à la planification ; (ii) engager une réflexion stratégique avec les directions techniques pour renforcer l'efficacité de la mise en œuvre du Programme ; (iii) mettre en place un mécanisme de suivi et d'évaluation et organiser une revue périodique de la mise en œuvre du programme.; - un Comité de pilotage (CoPil) composé d’un membre du Cabinet, du coordonnateur du SAC, du Directeur Administratif et Financier ou son représentant, d’un représentant de l’Inspection Général et d’un représentant du Ministère de l’Economie et des Finances. - un Bureau de Coordination des Programmes Education Nationale et Alphabétisation (BCPENA) qui sera opérationnel dans les deux années suivant la date effective de mise en vigueur du Programme. Les modalités de cette évolution seront confiées à la SAC. Aussi, l’Unité de gestion du projet (UGP) PAPSE, qui a une bonne connaissance des procédures de la Banque mondiale, assurera la mise en œuvre de la composante Assistance Technique du financement dans un premier temps. Dans le dispositif institutionnel du ministère, cette UGP est amenée à évoluer en BCPENA. - la mise en œuvre du programme implique plusieurs directions techniques qui désigneront chacune un point focal afin de planifier, mettre en œuvre et superviser les activités du programme relevant de leurs prérogatives. Ces points focaux formeront un comité technique (CoTech) présidé par un représentant de l’inspection générale, se réuniront au moins une fois par trimestre et communiqueront régulièrement avec le SAC et l’UGP/BCPENA pour suivre l’avancement de la mise en œuvre. La création de ce CoTech et la nomination des points focaux est une condition d’entrée de vigueur du PforR. Les risques institutionnels liés à la passation des marchés identifiés sur la base de l'expérience des projets antérieurs et qui devront être atténués dans le cadre de la mise en œuvre de la composante Assistance technique du Programme : 1. la cohabitation des textes nationaux et des Procédure de passation des marchés de la Banque mondiale, entrainant des divergences d’interprétation des textes au niveau des acteurs impliqués dans le processus de passation des marchés publics 2. la non-maitrise des délais d’approbation des marchés par l’UGP/BCPENA Project Procurement Strategy for Development 10 3. le long délai des procédures de résiliation des marchés en cas de défaillance des attributaires dans les exécutions des marchés. 2.1.1.2 Aspects économiques Avec plus de 25 millions d’habitants et un taux de croissance démographique de 2,6%, la Côte d’Ivoire (CI) se distingue depuis la fin de la crise post-électorale de 2010-2011, par la robustesse de sa croissance économique. En effet, sur la période 2012-2019, le PIB réel a augmenté au taux moyen annuel de 8,3% avec un taux d’inflation compris entre 0,4% et 1,2% de 2013 à 2019. Les résultats du point de vue de la pauvreté se sont également améliorés, avec un taux d’incidence de la pauvreté passant de 48,9% en 2008 à 39,4% en 2018, soit une baisse de 9,5%. Les tendances générales de la pauvreté monétaire cachent toutefois de profondes disparités régionales. De plus, la crise de la COVID-19 a aggravé les vulnérabilités socio-économiques, la plupart des ménages (80,7%) étant impactés par au moins une des mesures restrictives pour freiner la propagation de la pandémie. Par ailleurs, la fragilité de la réconciliation nationale et la menace terroriste liée aux risques d’extension de la crise du Sahel pourraient remettre en cause les acquis de développement. Le pays reste exposé à des défis multiformes, d’ordre naturel (inondations récurrentes), sanitaires (Covid-19) et socio-politiques avec des conséquences parfois humanitaires. La mise en œuvre réussie des PND 2012-2015 et 2016-2020, avec l’appui des partenaires techniques financiers (PTF), a permis à la Côte d’Ivoire de réaliser un taux de croissance moyen de 8% sur la période 2012-2019. « Malgré la pandémie de Covid-19 et les mesures barrières, l’économie ivoirienne a fait montre d’une capacité de résilience, avec un taux de croissance du Pib réel estimé à 2% en 2020 contre 6,2% en 2019. » relevait la Ministre du Plan et du Développement. Le PND 2021 - 2025 entend entériner les résultats atteints et s’attaquer aux défis qu’il reste à relever. Ainsi, quatre grands axes stratégiques ont été développés dans le PND 2021-2025. Il s’agit notamment du développement du capital humain de demain en renforçant les systèmes éducatifs et sanitaire ; la mise à niveau des accélérateurs de croissance ; la redynamisation des moteurs d’emplois et d’inclusion sociale ; et la revalorisation des moteurs d’exportations et d’investissements. La CI s’est fixée, dans le cadre du PND 2021-2025, l’objectif global de réaliser la transformation économique et sociale nécessaire pour hisser la CI, à l’horizon 2030, au rang des pays à revenu intermédiaire de la tranche supérieure. Pour soutenir son plan de développement, la CI a fait évoluer son environnement des affaires à travers de nombreuses reformes sur le plan juridique (création du code des investissements, code minier, code de l’électricité etc. et institutionnel (création du tribunal du commerce, du guichet unique, etc.). « Le Rapport Doing Business 2020, note une amélioration constante des performances de la CI en matière de facilitation et de simplification des procédures du cadre de gestion des affaires en CI. Selon ce rapport du groupe de la Banque Mondiale, la CI occupe la 110e place mondiale en matière de facilité de faire des affaires et connaît une progression de 12 places comparativement au rapport de l’année 2019. Ces différentes réformes ayant dopé la création d’entreprises (+ de 26% de créations entreprises entre 2018 et 2019) avec la création de nombreuses PME et petites entreprises individuelles, lesquelles ont bénéficié de mesures incitatives d’accès aux Marchés Publics. Toutefois, le secteur privé local est confronté à de nombreux défis tels que : i) un accès limité à des services financiers adaptés et aux informations sur les opportunités de marché ii) des compétences souvent insuffisantes en gestion des affaires ; iii) des difficultés à recruter du fait de faiblesses persistantes au niveau du système d’éducation et de formation ; et iv) des incertitudes persistantes concernant la sécurité et le climat des affaires. Ces difficultés des entrepreneurs privés devraient se ressentir dans la mise en œuvre des contrats dont ils seront titulaires dans le cadre du projet. Outre cet aspect, il faut relever le risqué financier dans le contexte actuel. En effet, le dollar américain connait une forte embellie par rapport à l’Euro. Aussi, la valeur monétaire en FCFA du montant du Programme et en particulier de la Composante IPF pourrait se dégrader de manière significative. En effet, une fin de la crise en Ukraine pourrait entrainer un recul significatif du dollar (en dessous de l’euro) et des pertes de change. Cela pourrait provoquer un déséquilibre Project Procurement Strategy for Development 11 au niveau des budgets. En effet, en novembre 2021, le cours du dollar était de 1 USD pour 585 FCFA contre 654 en début novembre 2022. Un retour du dollar à sa valeur de 2021, ramènerait le coût global de la composante FPI (20 millions USD) de 13,1 milliards de FCFA XOF à 11,7 milliards, soit une perte de gain de l’ordre de 11%. Pour mitiger ce risque, il faut donc constituer une réserve de change pour les imprévus de ce même orIdre, 11%. Sur le plan politique, la CI enregistre sa douzième année de stabilité après avoir connu de graves crises notamment celle de 2010 et celle de 2020 et 2021. Cette accalmie pourrait toutefois être remise en cause en raison des échéances futures. En effet, en 2023, se tiendront les élections municipales et législatives qui sont des moments de fortes tensions. Dans un tel environnement, des consultants internationaux pourraient craindre pour leur sécurité et limiter leurs déplacements en CI mais aussi empêcher le déroulement des activités de renforcement des capacités ou de réalisation d’études pour des consultants nationaux. Il n’est pas non plus exclu, que des tensions perturbent le calendrier scolaire. Sur le plan sanitaire, bien que la pandémie à Corona Virus ait été circonscrite, il faudrait toute de même envisager une résurgence de celles-ci avec son corollaire de restrictions. Cela entrainerait l’impossibilité de déplacement des Consultants étrangers et les regroupements des enseignants pour les formations en présentiel. Pour mitiger ces risques, il serait souhaitable de privilégier les experts locaux et de développer des canaux de formation à distance en mettant à profit la panoplie de service qu’offre le développement de la téléphonie, de l’internet et des réseaux sociaux tels que WhatsApp. 2.1.1.3 Aspects de durabilité : La conception du Programme s’inscrit pleinement dans les stratégies déjà développées et budgétisées dans le Plan Sectoriel Éducation/Formation (PSE) 2016-2025. Au cours des dix dernières années, le gouvernement a démontré un fort engagement envers l'éducation, malgré les crises politiques successives. Avec le PSE, le gouvernement a réaffirmé la priorité accordée au secteur de l'éducation, avec un budget récurrent d'éducation de plus de 30% du budget récurrent national total pour les prochaines années. Cela permettrait au MENA de couvrir l'augmentation des coûts récurrents générés par les réformes de l'éducation de base (y compris l'éducation préscolaire) et des améliorations de l'éducation de qualité. Aussi, le BCPENA, dans le cadre de l’assistance technique, procédera à un transfert de compétence aux structures du MENA pour leur permettre à terme de devenir à terme autonome. 2.1.1.4 Aspects technologiques La Côte d’Ivoire fait partie des 18 pays africains qui ont progressé dans l’édition 2022 de l’indice mondial de l’innovation (classement OMPI). Elle se classe 109e en 2022 contre 114e en 2021, selon l’organisation mondiale de la propriété intellectuelle. Cela s’est traduit par une percée dans toutes les régions du pays de la téléphonie et de l’internet, ouvrant ainsi la voie à une diversité d’opportunités économiques et des services variés comme toutes les solutions globales money. Ce résultat est en partie dû aux nombreuses et ambitieuses dispositions règlementaires dans le domaine (défiscalisation du matériel informatique, création de l’ANSUT etc.) et des investissements massifs dans le domaine (4 G, projet blackbone , avec même l’implémentation de la 5 G a titre pilote par certains opérateurs). Ce contexte a favorisé le développement d’applications et de solutions numérique même dans le secteur éducatif avec notamment l’inscription en ligne, les affectations en ligne et la mise en place de Systèmes d’Informations de Gestion de l’Éducation (SIGE) au MENA et le développement d’une carte scolaire dynamique pour appuyer la planification de la création de Nouvelles structures scolaire Avec la démocratisation de la connectivité et de l’internet, les opportunités d’amélioration des services éducatifs s’en trouvent renforcées. En effet, le MENA a initié depuis lors l’inscription en ligne, et depuis ces dernières années avec l’appui du PAGDS, les affectations en ligne. Par Project Procurement Strategy for Development 12 ailleurs, dans le cadre des moyens de mitigation des effets de la COVID, le MENA a développé un ensemble de solutions numériques pour la continuité des cours en dehors de l’école appelés “mon école à la maison”. Ces solutions utilisent aussi bien la télévision et la radio que des solutions en ligne via internet et la messagerie. De même, le MENA a interconnecté les différentes DRENA, ce qui permet de faire des Visio conférence. Ces solutions développées pourraient être une alternative pour la formation des enseignants dans le cadre de la formation continue et aussi pour le renforcement des capacités et des compétences que certains consultants animés par les consultants. La présence physique ne constitue plus un obstacle insurmontable pour la formation ou l’appui à apporter au MENA. Enfin, pour la collecte des données, les cabinets utilisent de plus en plus la collecte électroniques sur tablettes ou smartphone pour réduire le temps de traitement des données et pour assurer une fiabilité de celles-ci. Ces différentes solutions ont été utilisées dans le cadre du PAPSE avec succès. Toutefois des défis demeurent, qu’il s’agisse de la capacité des acteurs à prendre en main ses nouveaux outils que de la qualité de la connectivité. Ce défi pourra être levé à partir d’un renforcement des capacités et la mise à disposition de technologie plus simple En effet, l’Agence de Régulation des Télécommunications en Côte d’Ivoire (ARTCI) estime que 23% de la population totale soit autour de 6 millions de personnes ne bénéficie pas d’une bonne qualité de réseau. Concernant les achats, Il faut également noter que le secteur des achats comme le reste de l’économie et de l’administration est en pleine digitalisation avec la mise en place au niveau des achats publics du Système Intégré de Gestion des Opérations de Marchés Publics (SIGOMAP) et le Système Intégré de Gestion des Marchés Publics (SYGMAP) qui permet la planification, le suivi de l’approbation et la numérotation des contrats publics par les différentes autorités contractantes. Concernant spécifiquement les marches sous gestion de la Composante FPI comme le recrutement de consultants, les services autres que services de consultants et les acquisitions de fournitures, elles s’effectueront à partir de la plateforme de Suivi Systématique des Echanges en Passation des Marchés (STEP). Cette solution permet l’enregistrement et la validation des plans de passation des marchés mais également le suivi de la mise en œuvre des différents contrats et maintenant la gestion des contrats (nouveau module de. STEP). Toutefois, l’équipe de l’UGP PAPSE n ‘a pas encore bénéficié de renforcement des capacités sur ledit module afin d’en tirer tous les bénéfices. Cela constituera un défi pour l’équipe qui pourra être levé avec les sessions de renforcement des capacités organisées par la Banque. En conclusion, les défis technologies ne seront pas considérables dans la mise en œuvre de la Composante FPI du projet. 2.1.1.5 Conclusions clés La Côte d’Ivoire présente un environnement relativement propice pour les affaires qui garantit une transparence dans le processus d’attribution des marchés. De même, le niveau d’évolution technologique satisfaisant, facilitant ainsi l’accès à l’information de manière équitable à tous les opérateurs qui souhaiteraient participer aux marchés qui seront lancés dans le cadre de la mise en œuvre de la Composante FPI du programme. De même, l’existence de la plateforme STEP de la Banque mondiale amélioré avec le module Gestion des contrats devrait offrir de bonnes bases pour conduire de manière efficace et transparente les différents marchés qui concernent essentiellement la sélection de consultants internationaux et nationaux et l’acquisition de fournitures pour le fonctionnement de l’unité de gestion ou du BCPENA. Une bonne maitrise des risques constituera un atout certain à la bonne exécution de la composante assistance technique du Programme. L’expérience de projets antérieurs tels le PASEF, le PUAEB, le C2D 1, le PAPSE et l’existence d’une importante base de données de Project Procurement Strategy for Development 13 fournisseurs/prestataires de services, aussi bien au niveau national, régional , qu’international, offrent des conditions favorables de mise en œuvre des différents marchés envisagés. 3 Évaluation de l’expérience antérieure, de la capacité de l’Emprunteur et de l’Unité de Gestion du Projet (UGP) 3.1 Expérience La Côte d’Ivoire dispose d’une longue expérience de plus de 40 années des projets finances et cofinancés par le Groupe de la Banque mondiale. Au fil des années et tirant les leçons des goulots d’étranglement auxquels sont confrontées les unités de gestion des projets, le Gouvernement a réorganisé le cadre institutionnel d’accompagnement des projets. C’est ainsi, qu’il a mis en place une coordination de suivi des projets au sein de la Primature et une cellule technique en charge du suivi des projets cofinancés par les Partenaires Techniques et Financiers au sein du ministère des Finances a permis un suivi rigoureux des projets mais également une plus grande proactivité dans l’anticipation des problèmes. Sur le plan règlementaire, diverses réformes ont été implémentées notamment l’élaboration du décret 475 qui prévoit des développements spécifiques portant notamment sur (i) les questions d’intégration budgétaire et d’approvisionnement des comptes spéciaux du projet, (ii) les canaux de publication des mises en concurrence, (iii) la composition des Commission d’Ouverture des Plis et de Jugement des Offres, (iv) les seuils de signature et d’approbation des contrats etc. Ces dispositions ont permis une plus grande fluidité et célérité dans la planification, l’exécution des projets de développement. Le pays dispose à présent d’une expérience de gestion des projets financés par le groupe de la Banque Mondiale de type PforR avec une Composante FPI avec notamment : (i) le Projet d’Amélioration de la Gouvernance pour la Délivrance des Services de base aux citoyens (PAGDS) et le Programme d’Appui au Système des Filets Sociaux (PAFS). De manière spécifique, le MENA a également une bonne expérience dans la gestion des projets financés par les Partenaires Techniques et Financiers notamment la Banque mondiale. Avec ce dernier partenaire, les récents projets mis en œuvre et clôturés de manière relativement satisfaisante sont : • le Projet d’appui au secteur Education Formation (PASEF) de 1996 à 2012. • le Projet d’Urgence d’Appui à l’Education de Base (PUAEB) de 2012 à 2017. • le Projet d’Appui aux Prestation de services en Education (PAPSE depuis 2017). En effet, le BCPENA sera la nouvelle unité opérationnelle qui sera rattachée au MENA. Il sera créé par arrêté interministériel pris conjointement par le MENA, le ministère du Budget et le ministère des Finances pour assurer l’assistance technique à la mise en œuvre du Programme et la mise en œuvre de toute nouvelles initiatives se rapportant à l’éducation nationale. Le BCPENA sera un prolongement de l’Unité de gestion du projet (UGP) PAPSE / P163218. L’UGP a été créée en 2018 par un arrêté interministériel pour la mise en place du projet PAPSE. Le PSE étant solide et durable, il est devenu nécessaire de faire évoluer l’UGP en une agence de coordination durable sur le même modèle que le BCP-E (Bureau de Coordination des Programmes Emplois). La création du BCPENA est une condition d’entrée en vigueur du PforR Le BCPENA bénéficiera de la structure et du personnel de l’UGP-PAPSE. Sur la base de l’expérience de cette UGP PAPSE, le BCPENA devrait rapidement devenir opérationnel et son équipe devrait être dotée d’une forte capacité acquise au fil des années de supervision de la mise en œuvre du PAPSE. La gestion du projet dans le cadre du PAPSE a été jugée satisfaisante par la Banque mondiale depuis le début de la mise en œuvre. L’équipe de l’UGP est composée de consultants. Ils se sont constitués une expérience considérable pour avoir géré un projet pilote sur lequel ce Programme peut bâtir dans une perspective de mise à l’échelle. L’équipe clé de l’UGP est composée d’un coordonnateur, d’un responsable suivi-évaluation, d’un responsable administratif et financier et d’un spécialiste Project Procurement Strategy for Development 14 senior en passation de marché, d’un spécialiste en sauvegarde sociale et environnement, d’un spécialiste social, d’un ingénieur génie civil, d’un spécialiste en Développement Communautaire, d’un spécialiste sociale et d’un comptable. Ces ressources respectent toutes aux exigences de l’IDA. Ces ressources ont conduit depuis 2018, le PAPSE et dispose d’une solide expérience de collaboration avec les structures du MENA. Elle sera transférée au BCPENA pour permettre une transition harmonieuse et éviter de perturber la mise en œuvre du PAPSE, ainsi que pour assurer une mise en œuvre de grande qualité de la composante FPI de cette opération. En termes de leçons apprises pour les types d’activités qui seront conduites au niveau de la composante FPI : - la réussite du programme dépendra d’une bonne appropriation des directions ou structures du MENA des activités sous leur gestion. Cela implique également un fort engagement des premiers responsables de ces structures pour prendre des décisions quand il faudra ; - la nécessité d’identifier une stratégie efficace de formation des enseignants qui soit efficace, soutenable et durable (adopter par le MENA), car il s’agira de former un peu plus de 18,000 enseignants chaque année et en trois mois ; - la nécessité d’une bonne collaboration avec les Structures techniques du MENA y compris la désignation de points focaux ; - l’inexistence d’Experts au niveau national pour appuyer le Ministère, pour l’amélioration de l’enseignement et des apprentissages de la lecture et des mathématiques basées sur les observations de classes ; - l’identification de facilitateurs résidents au sein des communautés d’intervention facilite la mise en œuvre des programmes d’alphabétisation. - la nécessité de maintenir un dispositif de supervision des facilitateurs communautaires pour assurer et suivre le respect des normes ; - la disponibilité d’une base de données de fournisseurs qui sont capables de répondre aux besoins de fournitures de l’UGP ; - la nécessité de disposer d’un manuel opérationnel de mise en œuvre de cette approche. Au regard de ce qui précède, l’expérience du pays est globalement satisfaisante pour la mise en œuvre des projets financés par la Banque mondiale et d’apporter une Assistance technique efficace aux structures du MENA. 3.2 Capacités et aptitudes pour la gestion des contrats La cellule Passation des marchés (CPM) du PAPSE est animée par un Spécialiste Senior en Passation des Marchés dédié. Sur la base de l’expérience au niveau du PUAEB et du PAPSE, cette cellule comporte en son sein, un Spécialiste Senior en Passation des marchés ayant plus de 20 années d’expériences, deux Assistants en Passation des marchés de plus de 5 années d’expérience chacun et d’une assistante en archivage électronique ayant plus de 5 années d’expérience. Dans le cadre du PAPSE qui a démarré en juillet 2018, la Cellule Passation des Marchés a conduit un peu plus de 245 marchés de Fournitures, de Services de Consultances et de Services Assimilés pour un montant de 21 928 298 USD dont 100 sont achevés et clôturés à ce jour. Les statistiques en matière de passation des marchés indiquent par ailleurs autant de lignes à marchés annulées pour diverses raisons : - Retrait de tous les contrats en lien avec le fonctionnement qui ne figurent plus dans le PPM soumis sous STEP ; Project Procurement Strategy for Development 15 - L’annulation du PPM des conventions avec les COGES pour les financement des sous- projets. Il faut noter cependant que les marchés (travaux et fournitures) issus de ces conventions sont sous la supervision de la CPM ; - Le changement des stratégies de mise en œuvre de certaines activités. La CPM a mis en place au travers des inter médiateurs communautaires, des procédures de passation des marchés communautaires allégées au sein des COGES/Communautés villageoises afin de leur permettre de lancer eux-mêmes les appel d’offres pour la construction et la réhabilitation de 675 salles de classe primaires, de construction de 32 systèmes hydraulique villageoise. La CPM a fait l’acquisition de kits scolaires complémentaires pour 4 500 filles. Enfin, la CPM effectue au moins une mission de supervision des marchés passés par les COGES/Communautés villageoises. De sorte que l’on peut affirmer que l’UGP dispose des compétences adéquates dans la maîtrise des procédures de planification, de passation de marchés et de gestion des marchés pour les projets financés par la Banque mondiale, notamment à la passation et l’exécution de marchés de fournitures et à l’acquisition de services de consultants, qui représentent la majeure partie des activités à marchés. A noter que dans la composante Assistance Technique du programme, l’UGP ne sera pas amené à conduire des processus de passation de marché relatifs aux travaux de construction et de réhabilitation – Ces marchés seront menés par la cellule de passation des marchés du MENA qui a fait l’objet d’une évaluation fiduciaire dans le cadre de la préparation du programme. Toutefois, le MENA aura besoin de l’assistance technique l’UGP/BCPENA pour maitriser les procédures de gestion des infrastructures en mode communautaire. L’UGP devra s'appuyer sur les Directions centrales pour l’élaboration des TDRs spécifiques de certaines activités et la validation des rapports/prestations des consultants. Des renforcements de capacités des directions techniques se feront conformément au Manuel du Projet plus spécifiquement le Manuel d’Exécution, et le sous-manuel de Passation des Marchés Communautaire. 3.3 Systèmes de gestion des plaintes et de résolution de conflits Le système de gestion des plaintes et de résolution des conflits liés aux Marchés Publics mis en œuvre dans le pays tire sa source du Code des Marchés Publics et de ses textes d’application. L’Autorité Nationale de Régulation des Marchés Publics (ANRMP) est la structure en charge de la gestion des plaintes et de la résolution des conflits en matière de Marchés Publics. Le nouveau Code des Marchés Publics adopté en 2019 permet aux soumissionnaires de formuler des réclamations aux différentes étapes de la procédure de passation des marchés avec des délais de recours définies pour chacune des étapes. Après l’épuisement des voies de recours non juridictionnels, les litiges relatifs aux marchés publics sont soumis aux juridictions compétentes pour connaître du contentieux des contrats administratifs. Les litiges relatifs aux marchés publics peuvent également être soumis à un tribunal arbitral dans les conditions prévues par l’Acte Uniforme de l’OHADA relatif à l’arbitrage. Toutefois, il est prévu dans les Cahiers des Clauses Administratives Générales des dossiers types d’Appel à concurrence, des dispositions compromissoires qui permettent de gérer les recours devant les juridictions arbitrales. En matière d’expérience, sur le PAPSE, l’Unité de gestion a eu à gérer une plainte d’un soumissionnaire relativement à la mise en œuvre de la procédure. Cette plainte qui n’était pas juridictionnelle a été traité à la satisfaction du soumissionnaire. Project Procurement Strategy for Development 16 3.4 Conclusions clés Il est à noter que l’Emprunteur au travers du MENA possède une expérience significative et l’ensemble des capacités nécessaires à la gestion de ce type d’Assistance Technique fourni au sein du Programme. Quant à l’équipe de l’UGP, elle a non seulement les capacités mais une solide expérience en Passation des Marchés, gestions des contrats de Projet de ce type d’autant plus qu’elle est majoritairement constituée des membres de l’ancienne équipe Projet du PUAEB et du PAPSE. Il reste toutefois le défis de la maitrise du module Gestion des Contrats sous STEP. Un renforcement des capacités des Unité de gestion par les équipes de la Banque mondiale devrait permettre de relever ledit défi. Enfin, l’on pourrait conclure qu’à l’instar des Projets du Portefeuille de la BM, les mécanismes de gestion des plaintes sont disponibles aussi bien au niveau national que dans le cadre du Règlement de Passation des Marches de la Banque (Juillet 2016, révisé en novembre 2017 et Août 2018 et novembre 2020). La Cellule Passation des marchés du UGP/BCPENA a une expérience en matière de gestion des plaintes. 4 Analyse du marché 4.1 Dynamique du secteur du marché L’expérience montre qu’il existe au niveau national un marché des PME/PMI pour les acquisitions de fournitures et équipements (les travaux de construction ne sont pas éligibles dans la composante Assistance Technique). Cependant, ce marché présente des faiblesses. Les Services de Consultants : les cabinets et consultants spécialisés dans le domaine de l’éducation sont assez rares sur le marché national, une recherche sur le marché sous régional et international pourrait atténuer les risques. Cette faiblesse nationale au niveau du marché de consultant, entraine souvent : (i) l’infructuosité des résultats des AMI, des coûts additionnels des republications des avis, (ii) le recours à des consultants internationaux, ce qui en entraine des coûts importants dans les contrats de consultance. Les Fournitures et Equipements : des entreprises opérant dans le domaine des biens et services sont présentes sur le marché national. Le niveau de concurrence pourrait être qualifié de parfaite car en effet, il existe de nombreuses PME/PMI avec des capacités limitées et très peu de grands fournisseurs. Cependant, l’on ne peut dire que cela constitue un risque majeur pour le projet. Les Travaux : Cet aspect n’est pas éligible dans le cadre de la composante Assistance Technique du programme. 4.2 Tendances en matière d’approvisionnement Les tendances en matière d’approvisionnement sont en ce qui concerne : - l’acquisition de fournitures et équipements, l’approche préconisée est généralement la Demande de Cotations / Consultation Fournisseurs, donc une recherche nationale et restreinte et ce , compte tenu des montant très faibles des besoins en fournitures et équipements de la Composante FPI - pour l’acquisition de Services autres que services de consultants l’approche préconisée est la Demande de Propositions/Demande d’offres de services au niveau national et restreinte. - le recrutement des consultants se fera également à travers une compétition ouverte de préférence sur le marché national et le marché sous régional et exceptionnellement sur le marché international. Quelques activités spécifiques telles que la sélection du personnel de l’AT pourraient se faire par sélection directe. Project Procurement Strategy for Development 17 4.3 Conclusions clés L’analyse du marché basée sur les informations obtenues des annuaires professionnels, internet et des bases de données du Portefeuille des Projets Banque mondiale révèle un marché de fournisseurs de biens et de services existant au niveau national. Bien entendu, ces fournisseurs de biens et de services n’ont pas toujours de capacités techniques et financières solides, mais le marché existe. - les fournitures et équipements : l’on ne peut dire que cela constitue un risque majeur pour la Composante FPI. - les Services autres services de consultant (Services Assimilés) : Ces services ne constituent aucun risque majeur pour la Composante. - Les Services de Consultants : On pourrait conclure que le marché national des consultants n’est pas dynamique surtout dans le domaine de l’Education Nationale. - Les Travaux : les travaux ne sont pas éligibles dans le cadre de la composante Assistance Technique du programme. Enfin, dans la mise en œuvre de la composante Assistance Technique du programme, les activités seront exécutées sous forme de marchés. (Cf. liste figurant en annexe). La répartition des activités à marché se présente comme suit : - Services de Consultants pour les appuis au MENA pour environ 73% % en valeur monétaire - Acquisition de Fournitures pour environ 17 % en valeur monétaire - Services autres que services de consultants pour environ 10 % en valeur monétaire L’analyse Pareto fait apparaitre que 37 activités à marchés sur 63 ont une valeur cumulée de 73% % du PPM. Ces trente-sept (37) activités concernent spécifiquement des marchés de services de consultants pour apporter des appuis aux Directions Centrales du MENA. Ces marchés ne présentent pas de haut niveau de criticité égale à 8 (le plus haut niveau de criticité du PPM). Cependant ces marchés exigent un certain nombre de précautions. En effet, en ce qui la Sélection de Consultants Individuels (Facilitateurs communautaire) pour l’accompagnement de l’alphabétisation familiale, le seul facteur de risque pourrait être la disponibilité de ressources humaines qualifiées au niveau local. Cependant, il faut noter que ce personnel existe au niveau national (base de données du PUAEB et du PAPSE). En ce qui concerne la sélection de Consultants individuels et la sélection de Cabinets pour des appuis aux Directions Centrales du MENA, les principaux facteurs de risque seraient la non disponibilité de ces Consultants Individuels et de ces Cabinets sur le marché national (absence d’expérience/ expertises pertinentes du personnel, bonne connaissance du terrain, etc.) les délais de mise en œuvre, la mise à disposition dans les temps des Termes de référence, la qualité des Termes de référence et le coût de rémunération des Cabinets dans l’hypothèse où nous serions obligés d’aller à l’international. Toutefois, il important de relever qu’outre les lignes à marché listées dans le PPSD pour les cinq années de mise en œuvre du Programme estimé à ce stade à 6,55 millions de USD, il faudrait rajouter les charges de fonctionnement du BCPENA qui comprend la masse salariale du personnel et les autres charges de fonctionnement. La masse salariale annuelle brute est estimée à 1,08 millions USD soit 5,4 millions USD pour les 5 ans et 1,620 millions pour les 18 premiers mois. Quant aux autres charges de fonctionnement, elles sont estimées à 413 000 USD /année soit 2,1 millions USD pour les cinq (5) années de mise en œuvre. Project Procurement Strategy for Development 18 L’ensemble des activités planifiées à ce stade est estimé à 14 millions de USD sur les 20 millions prévus. Deux millions USD constituent les réserves contre les pertes de change et 4 millions USD sont réservés pour les imprévus qui prennent en compte les activités qui pourraient être déclenchées dans le cadre de l’Assistance et qui ne peuvent être déterminées à ce stade de la préparation du Programme. 4.4 Analyse SWOT La matrice SWOT ci-dessous présente la synthèse des points clés : FORCES FAIBLESSES • Expérience de l’équipe projet acquise dans le cadre du PUAEB et PAPSE : • Capacité fiduciaire et de passation des marchés • Faible capacité des directions centrales du MENA à (formation sur les thématiques : formuler de façon claire et précise leurs besoins, à élaboration d’un PPSD, le produire des TDRs et à respecter les plannings et les nouveau cadre Achat de la budgets. Banque Mondiale, la gestion des • Faiblesse du marché de consultants au niveau national contrats, etc.) • Existence d’une importante base de données fournisseurs. • Bonne connaissance du Secteur de l’Education OPPORTUNITES MENACES • Résurgence de la Pandémie à Corona virus qui pourraient entrainer des restrictions de déplacement des consultants internationaux, l’impossibilité d’organiser les ateliers de renforcement des capacités et une inflation des prix sur le marché pouvant entrainer des dépassements de budget ; • Existence d’un tissu • la réticence des consultants à intervenir en Côte d’Ivoire d’entreprises locales, et /ou l’inaccessibilité à toutes les communautés • Participation des Directions bénéficiaires s en raison des contraintes saisonnières et Centrales dans la préparation du de sécurité (risque de menaces djihadistes au niveau de Programme la zone frontalière du nord de la Cote d’Ivoire) • Les tensions liées aux prochaines échéances électorales qui pourraient entrainer une perturbation de la planification des activités • La persistance de la crise en Ukraine qui entraine une inflation au niveau des fournitures A la suite de ces éléments, nous préciserons l'analyse des risques inhérents au projet (point 3.) et l'impact sur les stratégies achats préconisées (points 4. & 5.) Project Procurement Strategy for Development 19 4.5 Analyse des risques liés à la passation des marchés L’acquisition des fournitures et équipements ne présente pas un niveau de risque substantiel. Quant aux travaux de construction, cet aspect n’est pas éligible dans le cadre de la composante Assistance Technique du programme. Le tableau ci-dessous présente les risques éventuels des différents marchés ainsi que les mesures d’atténuation permettant de les ramener à un niveau modéré : Description des mesures d’atténuation Détenteur Description du risque envisagées du risque Problème de fiabilité des Sécurisation des spécifications techniques par fournisseurs nationaux, en l'intégration des critères techniques de termes de compétences préqualification et sélection préconisée par les techniques, de disponibilité entités expertes (renforcement des DAO). Entreprises des matériels mobilisés, de Aménagement des conditions de règlement pour profils disponibles et de compenser au mieux les avances de fonds solidité financière réalisées par les fournisseurs. Sous-estimation financière des offres par les Mise en place de critères stricts dans les dossiers soumissionnaires. Risque de consultation/appel d’offres et qualification d'offres trop basses qui (application du principe de l’offre anormalement Entreprises mettent en difficultés les basse et de l’offre anormalement haute). attributaires dans la phase d’exécution des marchés La mauvaise description Impliquer, chaque fois, les services techniques et des fournitures et des les bénéficiaires dans le montage des dossiers. termes de références lors Pour des dossiers techniquement complexes, Direction du du montage du Dossier solliciter les experts du MENA ou autres experts MENA d’appel d’offres ou de Demande de pour leur appui dans l’élaboration des termes de propositions/cotations référence ou des spécifications techniques Suivi régulier de l’état d’avancement de l’exécution des marchés/contrats par des Le retard dans le délai de réunions entre le prestataire, la coordination du livraison/exécution qui Entreprises projet et les autres intervenants dans le risquerait de jouer sur le processus de réalisation/d’acquisitions calendrier des activités Prévision et application stricte des pénalités de retard. Une analyse minutieuse du curriculum vitae fait Compétence limitée du par le Comité en charge du recrutement. UGP/BCPENA Consultant Soutien élargi de la BIRD lors de l’évaluation des candidatures lors de la demande d’ANO. Impliquer toutes les Directions centrales du MENA La mauvaise description dans la description des compétences requises. Directions des compétences requises Revue préalable des TDR par la BIRD pour du MENA lors du montage des TDR approbation Project Procurement Strategy for Development 20 Faible attractivité du Publication dans UNDB online indépendamment UGP/ marché local du montant du contrat BCPENA Non disponibilité éventuelle Compétition ouverte (possibilité pour les UGP/ de consultants locaux consultants étrangers de postuler) BCPENA compétents Le retard dans le paiement Les dossiers financiers seront traités à temps et UGP/Chaine des factures des le comptable en charge du projet fera un suivi de paiement fournisseurs. régulier sur la chaine de paiement. 5 Objectifs de la Passation des marchés • Mieux répondre aux besoins des structures du MENA pour atteindre les résultats, tout en veillant au respect des Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI) et des règles nationales de passation des marchés. • Sélectionner les Consultants Internationaux et Nationaux présentant les meilleurs profils en termes de compétence et d’expertises. • Acquérir aux meilleurs rapports qualité-coût, les fournitures et les services en vue d’optimiser les ressources disponibles. 5.1 Approche de la passation des marchés recommandée pour le Projet : Comme nous l'avons évoqué auparavant, les stratégies préférentielles qui vont être exposées découlent d'une analyse croisée des montants des marchés (considérés au regard du montant total des marchés pour le projet) avec le niveau de criticité des risques évalués. Pour mémoire, cette analyse permet de positionner les différents marchés au sein d'une matrice qui souligne : • Les marchés à caractère stratégique, qui constitueront la priorité pour l'équipe projet et nécessiteront des approches achats favorisant les coopérations avec les fournisseurs (et/ou les communautés le cas échéant) • Les marchés de sécurisation, nécessitant une priorité de la stratégie d'achats vers la garantie d'un achat/approvisionnement livré en qualité et quantité dans les délais pour ne pas affecter le bon déroulement du projet, • Les marchés d'économies, sur lesquels les mises en concurrence des acteurs doivent permettre de réaliser des gains en termes de coût au bénéfice du projet, • Les marchés "non-critiques" qui doivent pouvoir être traités simplement et efficacement en mobilisant un minimum de temps et de ressources au niveau de l'équipe projet. Project Procurement Strategy for Development 21 Positionnement stratégique Achats et préconisations de Ligne à marchés stratégies de passation de marché Marchés à caractère stratégique Le Projet n’a aucun marché à caractère stratégique Marchés de sécurisation Le Projet n’a aucun marché à caractère stratégique Marchés d'économies Le Projet n’a aucun marché à caractère stratégique Tous les marchés concernent des activités pouvant être traitées simplement et efficacement en mobilisant un Marchés "non-critiques" minimum de temps et de ressources au niveau de l'équipe projet. Project Procurement Strategy for Development 22 1. Stratégie préférentielle (Arrangement privilégié) pour les activités à faible valeur et à faible risque (le cas échéant) cf. Fichier Excell Resume PPSD Projet PforR_03112022 - PARETO - PPM vu PAY (2) revu TAM du 270423.xls Project Procurement Strategy for Development 23 2. Analyse des activités de la Composante FPI Marchés Valeurs Somme sur Total NB sur Catégorie % en nbre de Étiquettes de lignes % en valeurs en USD de Marché marchés Fournitures 471 656 12 21% 22% Services de Consultants 1 232 567 20 55% 36% Services Assimilés 526 470 23 24% 42% Total général 2 230 692 55 100% 100% Fonctionnement Valeurs NB sur % en Somme sur % en Étiquettes de lignes Catégorie de nbre de Total en USD valeurs Marché marchés Masse salariale 22 36% 35% 1 232 567 Charges de Fonctionnement (Activités à marché selon procédures 35 29% 56% nationales) 998 125 Location des bureaux du siège 1 6% 2% 197 015 Eau & Electricité 1 4% 2% 127 644 Frais bancaire 1 0% 2% 8 955 Autres: Ateliers 1 22% 2% 749 269 Project Procurement Strategy for Development 24 Autres: Missions 1 3% 2% 89 555 Total général 62 100% 100% 3 403 130 Project Procurement Strategy for Development 25 3. Plan de Passation des Marchés des 18 premiers mois 1. Fournitures et Equipements 1. Fournitures et Equipements Méthode Type Réf de Méthode Montant Estimatif d'Examen Approches du . Description des fournitures Catégorie passation d'évaluation (USD) de la marché No. des envisagée Banque marchés Demande de Acquisition de 6 motos pour les Fournitures et Cout évalué le 1 A Posteriori Limité/National Cotations Facilitateurs Superviseurs 21 999 Équipements moins disant (DC) Demande de Acquisition de Fournitures et de Cout évalué le 2 Fourniture A Posteriori Limité/National Cotations matériels techniques Année 1 100 000 moins disant (DC) Acquisition de carte mémoire pour la Demande de Cout évalué le 3 diffusion des capsule et vidéo Fourniture A Posteriori Limité/National Cotations 7 000 moins disant d’éducation familiale (DC) Demande de Acquisition de Fournitures pour les Cout évalué le 4 Fourniture A Posteriori Limité/National Cotations Agents Alphabétiseurs du Pré-pilote 7 000 moins disant (DC) Demande de Achat de matériels informatiques et Cout évalué le 5 Fourniture A Posteriori Limité/National Cotations Techniques pour la Task Force 50 000 moins disant (DC) Demande de Acquisition d’un véhicule de type 4X4 Cout évalué le 6 Fournitures A Posteriori Limité/National Cotations pour la Task Force 66 666 moins disant (DC) Demande de Acquisition de Carburant pour les Cout évalué le 7 Fournitures A Posteriori Limité/National Cotations opérations des Directions du MENA 66 666 moins disant (DC) Demande de Achat de Fournitures pour les ateliers Cout évalué le 8 Fournitures A Posteriori Limité/National Cotations des Directions du MENA 16 666 moins disant (DC) Sous-Total Marchés de Fournitures 335 997 Project Procurement Strategy for Development 26 2. Services assimilés Réf Montant Méthode de Méthode Type d'Examen Approches du . Description des Services Catégorie passation des d'évaluation de la Banque marché No. Estimatif (USD) marchés envisagée Services Réalisation de capsules vidéo relatives à autres que Ouvert/Nationa Demande de Cout évalué le 1 A Posteriori l'alphabétisation familiale 233 333 services de l cotations moins disant consultants Services Contrat avec 20 radios locales pour assurer autres que Ouvert/ Demande de Cout évalué le 2 la diffusion des capsules vidéo dans les zones A Posteriori 120 000 services de National cotations moins disant d'intervention pilote consultants Services Reproduction de rapports et supports de autres que Demande de Cout évalué le 3 A Posteriori Limité/National communication pour la revue conjointe 6 667 services de Cotations moins disant consultants ED avec Agosoft - Demande de proposition/ négociation . Il Services s’agit ici de la firme Acquisition et installation du Logiciel autres que qui représente à Coût le plus 4 A Posteriori Limité/National Comptable TomPRO Multi projet 50 000 services de titre exclusif bas consultants TOMAT qui fournit le logiciel comptable utilisé sur tous les projet de la Banque Project Procurement Strategy for Development 27 ED avec Agosoft - Demande de proposition/négoci ation . Il s’agit ici Services de la firme qui Maintenance logiciel de comptabilité et de autres que 5 A Posteriori Limité/National représente à titre Coût gestion 2 000 services de exclusif TOMAT qui consultants fournit le logiciel comptable utilisé sur tous les projet de la Banque Services Demande de Conception et Reproduction des support du autres que Cout évalué le 6 A Posteriori Limité/National cotations Module d’Alphabétisation 20 160 services de moins disant consultants Services Edition et Reproduction des Documents autres que Cout évalué le 7 Pédagogiques (syllabaires, calculaires, A Posteriori Limité/National 22 800 services de moins disant manuels et guides ) Demande de consultants cotations Services Conception et Reproduction des Planches du autres que Demande de Cout évalué le 8 A Posteriori Limité/National Module d’Alphabétisation 25 334 services de Cotations moins disant consultants Services Edition et Reproduction du Document de la autres que Cout évalué le 9 A Posteriori Limité/National SNA 16 666 services de moins disant Demande de consultants cotations Services Acquisition d’un d’archivage électronique et autres que Cout évalué le 10 de gestion des données y compris acquisition A Posteriori Limité/National 100 166 services de moins disant du matériel Demande de consultants Cotations Services Reproduction de 41 Cartes des DRENA et des autres que Cout évalué le 11 A Posteriori Limité/National deux Districts 3 942 services de moins disant Demande de consultants Cotations Project Procurement Strategy for Development 28 Services Édition et Reproduction du Code de autres que Cout évalué le 12 A Posteriori Limité/National l’Education en CI 12 500 services de moins disant Demande de consultants Cotations Sous-Total Marchés de Services autre Services de Consultants 613 568 3. Services de Consultants Ré Montant Type Méthode Méthode de f. d'Exam Approches du d'évaluati Description des Prestations Catégorie passation des No Estimatif (USD) en de la marché on marchés . Banque envisagée Services AMI -Sélection Recrutement d'un Cabinet pour Qualificatio de A Ouvert/Nationa Fondée sur la 1 l’élaboration des outils didactique d’une n du 133 333 Consultant Posteriori l Qualification du alphabétisation familiale et nutrition Consultant s Consultant (SQC) Recrutement de 6 Facilitateurs Services AMI -Sélection Qualificatio Superviseurs pour la formation et le de A Ouvert/Nationa Fondée sur la 2 n du suivi de l'alphabétisation familiale dans 50 000 Consultant Posteriori l Qualification du Consultant les localités du pilote s Consultant (SQC) Pilote module d’alphabétisation - Services AMI -Sélection Sélection de Consultants Individuel Qualificatio de A Ouvert/Nationa Fondée sur la 3 (Facilitateurs communautaire) pour : n du 55 833 Consultant Posteriori l Qualification du Accompagnement et renforcement des Consultant s Consultant (SQC) capacités des communautés Recrutement d’un consultant individuel pour la révision de la stratégie Services AMI -Sélection nationale d’Alphabétisation (SNA) et Qualificatio 74 de A Ouvert/Nationa Fondée sur la 4 l’élaboration du Programme National n du 400 Consultant Posteriori l Qualification du d’Alphabétisation Familiale et Nutrition Consultant s Consultant (SQC) (PNAFN) Project Procurement Strategy for Development 29 Recrutement d’un consultant /cabinet Services AMI -Sélection Qualificatio en appui à la DSPES pour Renforcer de A Ouvert/Nationa Fondée sur la 5 n du l’outil carte scolaire en intégrant des 116 667 Consultant Posteriori l Qualification du Consultant interfaces additionnelles s Consultant (SQC) Recrutement d’un Consultant Services AMI -Sélection Qualificatio international pour appuyer la DPFC de A Ouvert/Nationa Fondée sur la 6 n du /MENA afin de Finaliser la PNAPAS & la 58 334 Consultant Posteriori l Qualification du Consultant SNAPAS s Consultant (SQC) Recrutement de consultants pour Services AMI -Sélection Qualificatio réaliser des études à la demande du de A Fondée sur la 7 Limité/National n du Secrétariat d’appui et de coordination 74 445 Consultant Posteriori Qualification du Consultant du PforR s Consultant (SQC) Services AMI -Sélection Recrutement de plusieurs Consultants Qualificatio de A Ouvert/Nationa Fondée sur la 8 pour réaliser des études identifiés par la n du 186 111 Consultant Posteriori l Qualification du Task Force Consultant s Consultant (SQC) Recruter un Consultant Individuel pour Services AMI -Sélection Qualificatio appuyer le MENA à finaliser le de A Ouvert/Nationa Fondée sur la 9 n du mécanisme institutionnel des COPs y 58 334 Consultant Posteriori l Qualification du Consultant compris la formation des usagers s Consultant (SQC) Services AMI -Sélection Recruter un Consultant pour réaliser une Qualificatio de A Ouvert/Nationa Fondée sur la 10 Etude sur la politique linguistique de la n du 33 334 Consultant Posteriori l Qualification du Côte d’Ivoire dans l’éducation Consultant s Consultant (SQC) Recruter un Cabinet pour réaliser une Services AMI -Sélection Etude sur la stratégie d'enseignement à Qualificatio de A Ouvert/Nationa Fondée sur la 11 distance et l'utilisation des nouvelles n du 163 819 Consultant Posteriori l Qualification du technologies pour l'enseignement en Consultant s Consultant (SQC) Côte d’Ivoire Services AMI -Sélection Recruter un Consultant Individuel pour Qualificatio de A Ouvert/Nationa Fondée sur la 12 réaliser une Etude sur la politique du n du 33 334 Consultant Posteriori l Qualification du livre en – CI Consultant s Consultant (SQC) Services AMI -Sélection Recruter un Consultant individuel pour Qualificatio de A Ouvert/Nationa Fondée sur la 13 appuyer le MENA à réaliser un Code de n du 75 000 Consultant Posteriori l Qualification du l’éducation CI Consultant s Consultant (SQC) Project Procurement Strategy for Development 30 Recruter un Consultant pour réaliser Services AMI -Sélection Qualificatio une Etude sur la faisabilité et les de A Ouvert/Nationa Fondée sur la 14 n du options pour la mise en œuvre de fonds 33 334 Consultant Posteriori l Qualification du Consultant commun pour l’éducation s Consultant (SQC) Services AMI -Sélection Consultant Vérificateur Indépendant : Qualificatio de A Ouvert/Nationa Fondée sur la 15 Consultant Individuel pour ILD 6 (pour 4 n du 66 666 consultant Posteriori l Qualification du ans) Consultant s Consultant (SQC) Services AMI - Sélection Consultant Vérificateur Indépendant : de A Ouvert/Nationa Fondée sur la Qualité et 16 Sélection d’un Cabinet pour les ILD 1, 2, 416 666 Consultant Posteriori l Qualité et le Cout Cout 4, 5 et 9 (pour 5 ans ) s (SFQC) Services AMI - Sélection Consultant Vérificateur Indépendant : de A Ouvert/Nationa Fondée sur la Qualité et 17 Sélection d’un Cabinet pour les ILD 3, 7 333 333 Consultant Posteriori l Qualité et le Cout Cout et 8 (pour 5 ans) s (SFQC) Sélection d’un Cabinet d’Expertise Services AMI - Sélection Comptable pour la réalisation de l’Audit de A Ouvert/Nationa Fondée sur la Qualité et 18 externe du Projet pour les exercices 38 333 Consultant Posteriori l Qualité et le Cout Cout 2023 et 2024 s (SFQC) ED Bastian Michel. Il s'agit du Chercheur qui travaille sur l'évaluation d'impact du PAPSE. Pas d'honoraires uniquement coûts Recrutement d'un Consultant Chercheur Services d'opérations Qualificatio International pour la réalisation de de A 19 Limité/National (missions et n du l'étude d'Impact du Programme 125 000 Consultant Posteriori déplacement). En Consultant 2023_2027 s le gardant, le Programme minimise les coûts et les recherches conduites sont plus intéressantes puisque l'observations se Project Procurement Strategy for Development 31 fait à moyen et long terme. Sélection d’un Cabinet pour le développement de quatre (4) applicatifs : (i) Observation de classe et Services AMI -Sélection Qualificatio Analyse de données, de A Fondée sur la 20 Limité/National n du (ii) Distribution des Manuels 111 166 Consultant Posteriori Qualification du Consultant s Consultant (SQC) (iii) Suivi de la Formation des Enseignants (iv) Visites médicales Services AMI -Sélection Sélection d’un Consultant Individuel Qualificatio de A Fondée sur la 21 pour l’élaboration du cadre de Limité/National n du 41 666 Consultant Posteriori Qualification du Fonctionnement et du Manuel du SACRE Consultant s Consultant (SQC) Sélection d’un Consultant Individuel Services AMI -Sélection Qualificatio pour l’élaboration du cadre de de A Fondée sur la 22 Limité/National n du Fonctionnement et du Manuel du 41 666 Consultant Posteriori Qualification du Consultant BCPENA s Consultant (SQC) Services AMI -Sélection Sélection d’un Cabinet pour actualiser Qualificatio de A Fondée sur la 23 les Plans architecturaux des deux Limité/National n du 83 333 Consultant Posteriori Qualification du CAFOP à réaliser Consultant s Consultant (SQC) ED avec KOUAKOU Noel, actuellement en poste avec la TF Services et dont la Qualificatio Sélection d’un Spécialiste en Economie de A 24 Limité/National performance a été n du de l’Education au profit de la Task Force 326 834 Consultant Posteriori jugée satisfaisante Consultant s par le Coordonnateur de la TF Project Procurement Strategy for Development 32 ED avec TOTI Aristide actuellement en Services poste avec la TF et Qualificatio Sélection d’un Spécialiste en Economie de A dont la 25 Limité/National n du de l’Education au profit de la Task Force 351 500 Consultant Posteriori performance a été Consultant s jugée satisfaisante par le Coordonnateur de la TF Sélection d’un Consultant Individuel pour élaborer le document d’orientation Services AMI -Sélection Qualificatio pour le titrement des parcelles dédiées de A Fondée sur la 26 Limité/National n du aux édifices scolaires y compris la 29 666 Consultant Posteriori Qualification du Consultant procédure d’acquisition desdites s Consultant (SQC) parcelles. Sélection d’un Cabinet d’Expertise Services AMI - Sélection Comptable pour la réalisation de l’Audit de A Ouvert/Nationa Fondée sur la Qualité et 27 externe du Projet pour les exercices 25 000 Consultant Posteriori l Qualité et le Cout Cout 2025 s (SFQC) Sélection d’un Cabinet d’Expertise Services AMI - Sélection Comptable pour la réalisation de l’Audit de A Ouvert/Nationa Fondée sur la Qualité et 28 externe du Projet pour les exercices 25 000 Consultant Posteriori l Qualité et le Cout Cout 2026 s (SFQC) Sélection d’un Cabinet d’Expertise Services AMI - Sélection Comptable pour la réalisation de l’Audit de A Ouvert/Nationa Fondée sur la Qualité et 29 externe du Projet pour les exercices 25 000 Consultant Posteriori l Qualité et le Cout Cout 2027 s (SFQC) Sélection d’un Cabinet d’Expertise Services AMI - Sélection Comptable pour la réalisation de l’Audit de A Ouvert/Nationa Fondée sur la Qualité et 30 externe du Projet pour les exercices 25 000 Consultant Posteriori l Qualité et le Cout Cout 2028 s (SFQC) Services AMI -Sélection Qualificatio Sélection d’un Assistant Comptable de A Fondée sur la 31 Limité/National n du auprès de la DAF du MENA 115 858 Consultant Posteriori Qualification du Consultant s Consultant (SQC) Project Procurement Strategy for Development 33 Sélection d’un Cabinet pour Services AMI -Sélection Qualificatio l’élaboration d’un Système de de A Fondée sur la 32 Limité/National n du Planification et de Suivi et Evaluation du 116 667 Consultant Posteriori Qualification du Consultant Programme s Consultant (SQC) ED avec TIAN BI Rodolphe , actuellement Sélection d’un Consultant Individuel- Services consultant en Qualificatio Planificateur à temps partiel pour de A 33 Limité/National charge de n du accompagner le MENA dans le cadre de 30 000 Consultant Posteriori l’accompagnement Consultant la mise en œuvre du PTBA s du MENA pour l’élaboration du PTBA du PRSEP . Sélection d’un Consultant Individuel en Services AMI -Sélection appui à la DAF/MENA pour l’élaboration Qualificatio de A Fondée sur la 34 d’un Manuel de Contrôle de Gestion des Limité/National n du 58 334 Consultant Posteriori Qualification du Directions Techniques et Régionales du Consultant s Consultant (SQC) MENA Services AMI - Sélection Sélection d’un Cabinet pour la collecte de A Fondée sur la Qualité et 35 des données comptant pour la Baseline Limité/National 250 000 Consultant Posteriori Qualité et le Cout Cout du PRSEP s (SFQC) Services AMI -Sélection Sélection d’un Cabinet pour la Qualificatio de A Fondée sur la 36 Formation des Directions du MENA sur la Limité/National n du 150 000 Consultant Posteriori Qualification du Gestion Axée sur les Résultats _ GAR Consultant s Consultant (SQC) Sous-Total Marchés de Services de Consultants 3 932 966 Project Procurement Strategy for Development 34 PROCUREMENT Cote d'Ivoire : Côte d'Ivoire Strengthening Primary Education System Operation PLAN General Information Country: Cote d'Ivoire 2023-05-12 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P177800 GPN Date: Project Name: Côte d'Ivoire Strengthening Primary Education System Operation Loan / Credit No: IDA / 72560 Bureau de Coordination des Programmes Education Nationale et Alphabétisation Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-BCPENA-352896-GO-RFQ Request for Quota Single Stage - One E Pending Impl / Acquisition de 6 motos pour IDA / 72560 Post Limited 21,999.00 0.00 2023-05-16 2023-06-24 2023-07-08 tions nvelope ementation les Facilitateurs Superviseurs CI-BCPENA-352908-GO-RFQ Request for Quota Single Stage - One E Pending Impl / Acquisition de Fournitures e IDA / 72560 Post Limited 100,000.00 0.00 2023-10-21 2023-11-17 2023-12-01 tions nvelope ementation t de matériels techniques (An née 1) CI-BCPENA-358381-GO-RFQ / Acquisition de Fournitures d Request for Quota Single Stage - One E Pending Impl IDA / 72560 Post Limited 7,000.00 0.00 2024-01-21 2024-02-19 2024-03-05 e bureau pour les Agents Alp tions nvelope ementation habétiseurs du Pré-pilote CI-BCPENA-358364-GO-RFQ / Acquisition de cartes mémo Request for Quota Single Stage - One E Pending Impl ires pour la diffusion courts IDA / 72560 Post Limited 7,000.00 0.00 2023-06-07 2023-07-06 2023-07-21 tions nvelope ementation messages et de vidéos d’édu cation familiale. auprès des C ommunautés NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-BCPENA-352919-NC-RFB / Conception et réalisation de Single Stage - One E Pending Impl IDA / 72560 Post Request for Bids Open - National 233,333.00 0.00 2023-05-01 2023-05-06 2023-06-05 2023-07-05 2023-08-09 2023-11-07 capsules vidéo relatives à l'al nvelope ementation phabétisation familiale CI-BCPENA-352934-NC-RFQ / Reproduction de rapports et Request for Quota Single Stage - One E Pending Impl IDA / 72560 Post Limited 6,667.00 0.00 2023-07-06 2023-08-02 2023-08-17 supports de communication tions nvelope ementation pour la revue conjointe CI-BCPENA-352949-NC-DIR / Pending Impl Maintenance logiciel de com IDA / 72560 Post Direct Selection Direct - National 2,000.00 0.00 2023-05-15 2023-05-20 2023-06-27 2024-06-26 ementation ptabilité et de gestion CI-BCPENA-359131-NC-RFQ / Request for Quota Single Stage - One E Pending Impl Fourniture de carburant pour IDA / 72560 Post Limited 66,666.00 0.00 2024-02-27 2024-03-27 2024-04-11 tions nvelope ementation les opérations des directions du MENA CI-BCPENA-359136-NC-RFQ / Request for Quota Single Stage - One E Pending Impl Conception et reproduction d IDA / 72560 Post Limited 20,160.00 0.00 2023-07-09 2023-08-07 2023-08-22 tions nvelope ementation es supports du module d'alph abétisation CI-BCPENA-359140-NC-RFQ / Editions et reproduction des Request for Quota Single Stage - One E Pending Impl IDA / 72560 Post Limited 22,800.00 0.00 2024-01-15 2024-02-13 2024-02-28 documents pédagogiques (sy tions nvelope ementation llabaire calculaires, manuels et guide) CI-BCPENA-359143-NC-RFQ / Request for Quota Single Stage - One E Pending Impl Conception et reproduction d IDA / 72560 Post Limited 25,334.00 0.00 2023-06-21 2023-07-20 2023-08-04 tions nvelope ementation es planches du Module d'Alp habétisation CI-BCPENA-359226-NC-RFQ / Request for Quota Single Stage - One E Pending Impl Reproduction de 41 cartes de IDA / 72560 Post Limited 3,942.00 0.00 2023-09-18 2023-10-17 2023-11-01 tions nvelope ementation s DRENA et des deux districts CI-BCPENA-359268-NC-RFQ / Request for Quota Single Stage - One E Pending Impl Edition et reproduction du co IDA / 72560 Post Limited 12,500.00 0.00 2023-07-25 2023-08-23 2023-09-07 tions nvelope ementation de de l'Education en CI CI-BCPENA-359444-NC-RFQ / Acquisition de fournitures de Request for Quota Single Stage - One E Pending Impl IDA / 72560 Post Limited 16,666.00 0.00 2023-08-27 2023-09-25 2023-10-10 bureau et matériels techniqu tions nvelope ementation es pour les ateliers des direct ion du MENA CI-BCPENA-359445-NC-RFQ / Request for Quota Single Stage - One E Pending Impl Edition et reproduction du do IDA / 72560 Post Limited 16,666.00 0.00 2023-06-12 2023-07-11 2023-07-25 tions nvelope ementation cument de la SNA CI-BCPENA-352953-NC-DIR / Pending Impl Acquisition et installation du IDA / 72560 Post Direct Selection Direct - National 50,000.00 0.00 2023-05-15 2023-05-20 2023-06-14 2024-06-13 ementation Logiciel Comptable TomPRO Multi projet CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 CI-BCPENA-352958-CS-CQS / Sélection d'un cabinet pour l a conception d’un module d’ alphabétisation familiale, int Consultant Qualifi Pending Impleme IDA / 72560 Post Open - National 133,333.00 0.00 2023-05-08 2023-05-22 2023-06-20 2023-07-11 2023-08-15 2023-11-13 égrant l’acquisition de comp cation Selection ntation étences de base, la sensibilis ation à la nutrition, au dévelo ppement cognitif du jeune en fant et aux violences basées sur le genre CI-BCPENA-353026-CS-CQS / Sélection d’un cabinet en ap Consultant Qualifi Under Implement pui à la DSPES pour Renforce IDA / 72560 Post Open - National 116,667.00 0.00 2023-04-21 2023-06-20 2023-05-05 2023-05-22 2023-06-05 2023-07-10 2023-10-08 cation Selection ation r l’outil carte scolaire en inté grant des interfaces addition nelles CI-BCPENA-353300-CS-CQS / Sélection d'un Cabinet dans l Consultant Qualifi Pending Impleme e but d'appuyer le MENA pou IDA / 72560 Post Open - National 58,334.00 0.00 2023-05-10 2023-05-24 2023-06-17 2023-06-27 2023-08-01 2023-09-30 cation Selection ntation r la finalisation du mécanism e institutionnel des COPs CI-BCPENA-353046-CS-CQS / Sélection d'un Cabinet pour r éaliser une Etude sur la strat Consultant Qualifi Pending Impleme IDA / 72560 Post Open - National 163,819.00 0.00 2023-10-02 2023-10-23 2023-11-11 2023-11-25 2023-12-30 2024-02-28 égie d'enseignement à distan cation Selection ntation ce et l'utilisation des nouvell es technologies pour l'enseig nement en Côte d’Ivoire CI-BCPENA-353282-CS-CQS / Sélection d'un Cabinet pour l a réalisation d'une Etude sur Consultant Qualifi Pending Impleme IDA / 72560 Post Open - National 33,334.00 0.00 2023-12-06 2023-12-27 2024-01-31 2024-02-21 2024-03-20 2024-06-08 la faisabilité et les options po cation Selection ntation ur la mise en œuvre de fonds commun pour l’éducation CI-BCPENA-353059-CS-LCS / Sélection d'un cabinet d'audi Least Cost Selecti Pending Impleme t externe pour la réalisation IDA / 72560 Post Open - National 38,333.00 0.00 2024-09-30 2024-10-21 2024-12-04 2025-01-01 2025-01-31 2025-03-07 2025-04-11 2025-06-10 on ntation de l'Audit comptable et finan cier des exercices 2023 et 20 24 du PRSEP CI-BCPENA-356833-CS-CQS / Consultant Qualifi Pending Impleme Sélection d’un cabinet vérific IDA / 72560 Post Open - National 83,333.00 0.00 2023-05-02 2023-05-23 2023-06-20 2023-07-20 2023-08-24 2024-08-23 cation Selection ntation ateur indépendant pour les IL D 1,2,4,5 et 9 CI-BCPENA-356834-CS-CQS / Consultant Qualifi Pending Impleme Recrutement d’un cabinet vé IDA / 72560 Post Open - National 66,667.00 0.00 2023-05-02 2023-05-16 2023-06-20 2023-07-04 2023-08-08 2024-08-07 cation Selection ntation rificateur indépendant pour l es ILD 3,7,8 CI-BCPENA-356843-CS-INDV / Sélection d'un Cabinet pour le développement d'applicati Consultant Qualifi Pending Impleme fs pour (i)les observations de IDA / 72560 Post Open - National 111,166.00 0.00 2023-05-15 2023-05-16 2023-06-20 2023-07-11 2023-08-08 2023-09-07 cation Selection ntation classes et d'analyse des don nées, (ii) la distribution des manuels et (iii) le suivi de la f ormation des enseignants CI-BCPENA-356846-CS-CQS / Sélection d’un cabinet pour l’ élaboration d’un système de Consultant Qualifi Pending Impleme planification et de suivi évalu IDA / 72560 Post Open - National 150,000.00 0.00 2023-06-02 2023-06-23 2023-07-21 2023-08-11 2023-09-15 2023-12-14 cation Selection ntation ation pour le Programme y c ompris l'accompagnement d u Programme (pendant 10 m ois) CI-BCPENA-356852-CS-CQS / Sélection d’un cabinet pour l’ Consultant Qualifi Pending Impleme élaboration du document nat IDA / 72560 Post Open - National 106,032.00 0.00 2023-05-04 2023-05-18 2023-06-11 2023-06-25 2023-07-23 2023-09-21 cation Selection ntation ional de référence de la régio nalisation du recrutement de s enseignants CI-BCPENA-359270-CS-CQS / Sélection d'un cabinet pour l e développement de quatre Consultant Qualifi Pending Impleme applicatifs (observation des c IDA / 72560 Post Open - National 111,166.00 0.00 2023-05-10 2023-05-24 2023-06-17 2023-06-19 2023-07-24 2023-08-23 cation Selection ntation lasses et analyse des donnée s, distribution des manuels, s uivi de la formation des ensei gnants, visites médicales) CI-BCPENA-359271-CS-CQS / Sélection d’un Cabinet pour a Consultant Qualifi Pending Impleme IDA / 72560 Post Open - National 83,333.00 0.00 2023-07-20 2023-08-03 2023-08-31 2023-09-21 2023-10-26 2024-01-24 ctualiser les Plans architectur cation Selection ntation aux des deux CAFOP à réalis er CI-BCPENA-359287-CS-CQS / Sélection d'un cabinet pour l' Consultant Qualifi Pending Impleme élaboration d'un système de IDA / 72560 Post Open - National 116,667.00 0.00 2023-05-15 2023-05-29 2023-06-29 2023-07-20 2023-08-17 2023-10-16 cation Selection ntation planification et de suivi et év aluation du programme CI-BCPENA-359291-CS-QCBS / Sélection d’un Cabinet pour Quality And Cost- Pending Impleme IDA / 72560 Post Open - National 250,000.00 0.00 2023-06-15 2023-07-06 2023-08-19 2023-09-16 2023-10-16 2023-11-20 2023-12-25 2024-02-23 la collecte des données comp Based Selection ntation tant pour la Baseline du PRSE P CI-BCPENA-359292-CS-CQS / Sélection d’un Cabinet pour l Consultant Qualifi Pending Impleme a Formation des Directions d IDA / 72560 Post Open - National 150,000.00 0.00 2023-06-16 2023-06-30 2023-07-31 2023-08-21 2023-09-18 2023-11-17 cation Selection ntation u MENA sur la Gestion Axée s ur les Résultats _ GAR CI-BCPENA-359437-CS-CQS / Recrutement d'un cabinet po Consultant Qualifi Pending Impleme ur l'élaboration des outils did IDA / 72560 Post Open - National 133,333.00 0.00 2023-05-10 2023-05-24 2023-06-21 2023-07-12 2023-08-09 2023-11-07 cation Selection ntation actiques d'une alphabétisatio n familiale et nutrition INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 CI-BCPENA-353017-CS-INDV / Recrutement de 6 Facilitate Individual Consult Pending Impleme urs Superviseurs, pour la for IDA / 72560 Post Limited 50,000.00 0.00 2023-05-08 2023-05-13 2023-05-23 2023-06-07 2024-06-06 ant Selection ntation mation et le suivi de l'alphab étisation familiale dans les lo calités du pré-pilote CI-BCPENA-353028-CS-INDV / Recrutement d’un Consulta Individual Consult Pending Impleme nt international pour appuyer IDA / 72560 Post Limited 58,334.00 0.00 2023-05-04 2023-05-09 2023-05-19 2023-06-16 2023-08-15 ant Selection ntation la DPFC /MENA afin de Finali ser la PNAPAS & la SNAPAS CI-BCPENA-355527-CS-INDV / Sélection d'un consultant in Individual Consult Pending Impleme IDA / 72560 Post Limited 33,334.00 0.00 2023-05-12 2023-05-17 2023-05-27 2023-06-20 2023-08-04 dividuel pour réaliser une Etu ant Selection ntation de sur la politique du livre en – CI CI-BCPENA-356851-CS-INDV / Sélection d’un consultant in dividuel pour l’élaboration du Individual Consult Pending Impleme document d’orientation pour IDA / 72560 Post Limited 28,803.00 0.00 2023-07-03 2023-07-08 2023-07-22 2023-08-19 2023-09-28 ant Selection ntation le titrement des parcelles dé diées aux édifices scolaires, y compris la procédure pour l ’acquisition des terrains CI-BCPENA-356856-CS-INDV / Sélection d’un consultant in Individual Consult Pending Impleme dividuel pour l'élaboration du IDA / 72560 Post Limited 41,666.00 0.00 2023-08-08 2023-08-13 2023-08-27 2023-09-20 2023-11-19 ant Selection ntation cadre de fonctionnement et du manuel de procédure du SACRE CI-BCPENA-356857-CS-INDV / Sélection d’un consultant in Individual Consult Pending Impleme dividuel pour l'élaboration du IDA / 72560 Post Limited 41,666.00 0.00 2023-08-09 2023-08-14 2023-08-28 2023-09-21 2023-11-20 ant Selection ntation cadre de fonctionnement et du manuel de procédure du BCPENA. CI-BCPENA-358346-CS-INDV / Recrutement d'un consultan Individual Consult Pending Impleme IDA / 72560 Post Limited 16,990.00 0.00 2023-05-17 2023-05-22 2023-06-05 2023-06-29 2023-07-29 t pour l'élaboration du Mécan ant Selection ntation isme de Gestion des Plaintes (MGP) du MENA CI-BCPENA-359276-CS-INDV / Recrutement d'un consultan t individuel pour élaborer le d Individual Consult Pending Impleme ocument d'orientation pour l IDA / 72560 Post Limited 29,666.00 0.00 2023-05-22 2023-05-27 2023-06-06 2023-07-04 2023-10-02 ant Selection ntation e titrement des parcelles déd iées aux édifices scolaires y c ompris la procédure d'acquisi tion desdites parcelles CI-BCPENA-359286-CS-INDV Individual Consult Pending Impleme / Recrutement d'un assistant IDA / 72560 Post Limited 23,568.00 0.00 2023-05-08 2023-05-13 2023-05-23 2023-06-16 2024-06-15 ant Selection ntation comptable auprès de la DAF du MENA CI-BCPENA-359290-CS-INDV / Sélection d’un Consultant In dividuel en appui à la DAF/M Individual Consult Pending Impleme IDA / 72560 Post Limited 58,334.00 0.00 2023-05-18 2023-05-23 2023-06-06 2023-06-30 2023-07-30 ENA pour l’élaboration d’un ant Selection ntation Manuel de Contrôle de Gestio n des Directions Techniques et Régionales du MENA CI-BCPENA-359439-CS-INDV / Recruter d’un consultant in Individual Consult Pending Impleme dividuel pour réaliser la Mise IDA / 72560 Post Open - National 41,667.00 0.00 2023-05-15 2023-06-17 2023-07-01 2023-07-29 2023-10-27 ant Selection ntation à jour de la stratégie national e d’alphabétisation et d’éduc ation non formelle CI-BCPENA-356836-CS-INDV / Recrutement d’un consulta Individual Consult Pending Impleme nt individuel vérificateur indé IDA / 72560 Post Limited 16,667.00 0.00 2023-05-02 2023-05-07 2023-05-21 2023-06-18 2024-06-17 ant Selection ntation pendant pour les résultats d’ apprentissage (ILD 6) CI-BCPENA-355530-CS-INDV / Sélection d'un Consultant in Individual Consult Pending Impleme dividuel pour la réalisation d' IDA / 72560 Post Limited 33,334.00 0.00 2023-07-03 2023-07-08 2023-07-22 2023-08-19 2023-10-18 ant Selection ntation une Etude sur la politique lin guistique de la Côte d’Ivoire dans l’éducation CI-BCPENA-353053-CS-INDV / Recrutement d'un Consulta Individual Consult Pending Impleme IDA / 72560 Post Open - National 75,000.00 0.00 2023-06-15 2023-07-29 2023-08-12 2023-09-09 2024-01-07 nt individuel pour appuyer le ant Selection ntation MENA à réaliser un Code de l’ éducation CI CI-BCPENA-359460-CS-INDV / Pilote module d’alphabétisa tion - Sélection de six (6) Fa Individual Consult Pending Impleme cilitateurs Communautaires s IDA / 72560 Post Limited 55,833.00 0.00 2023-06-01 2023-06-03 2023-06-17 2023-07-11 2024-07-10 ant Selection ntation ous statut de Consultants Ind ividuels pour un accompagn ement et renforcement des c apacités des communautés. CI-BCPENA-353018-CS-INDV / Recrutement d’un consulta Individual Consult Pending Impleme nt individuel pour réaliser la IDA / 72560 Post Limited 37,200.00 0.00 2023-07-14 2023-07-19 2023-08-02 2023-08-30 2024-02-26 ant Selection ntation Mise à jour de la stratégie na tionale d’alphabétisation et d ’éducation non formelle Page 3 TOGO PROJET : No d’identification du projet [P?] PLAN DE PASSATION DES MARCHES SIMPLIFIE VERSION N° ?? I. GENERAL 1. Informations sur le Projet Emprunteur : République Togolaise Ministère : Responsable Nom du Projet : Identification : PRET BIRD N° Agence chargée de : la mise en œuvre du projet 2. Date d’approbation par la Banque du plan de passation de marchés : [A indiquer] 3. Date de publication de l’Avis Général de Passation des Marchés : [A indiquer] 4. Période couverte par la Plan de Passation des Marchés : [A indiquer] 5. Evaluation de risque par P-RAMS (Procurement Risk Assessment and Management System): Elevé II. TRAVAUX, FOURNITURES ET SERVICES AUTRES QUE LES SERVICES DE CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable : Seuils requis pour les décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans l’annexe 1 des "Directives de Passation des Marchés de fournitures, de travaux et de services (autres que les services de consultants) par les Emprunteurs de la Banque mondiale dans le cadre des prêts de la BIRD et des crédits de l’AID. Catégories de marchés Montants Observations estimatifs des contrats en millions de dollars américains Travaux (incluant clé à main, Fourniture et Installation, et les >= 5 Partenariat Public - Privé -PPP) Biens, Système d’Information et de Services autres que les Services >= 1,5 intellectuels Travaux (incluant clé à main, Fourniture et >= 5 Installation, et les Les justifications de l’entente Contrats à Partenariat Public - directe passer par Privé -PPP) devront être jointes et entente directe Biens, Système approuvées avec PPM d’Information et de Services autres >= 1,5 que les Services intellectuels 2. Pré qualification : Aucune n’a été pour l’instant identifiée. Toutefois, en cas de pré-qualification, les soumissionnaires seront pré qualifiées en accord avec les dispositions des paragraphes 2.9 et 2.10 des directives. 3. Seuils pour les méthodes de passation des marchés : Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES ET SERVICES AUTRE QUE LES SERVICES DE TRAVAUX (US$ équivalent) CONSULTANTS(US$ équivalent) AOI AON DC AOI AON DC < < 100.000 <5.000.00 ≥5.000.000 <5.000.000 200.00 ≥5.000.000 0 0 4. Dispositions spéciales sur les marchés : Concernant les acquisitions de véhicules et de carburant, en fonction des circonstances et des besoins spécifiques du pays, le seuil pour la consultation de fournisseurs pourrait être porté à la contre-valeur d’USD 500,000 (en prenant soin de consulter tous les principaux concessionnaires de marque ou distributeurs de produits pétroliers). 5. Liste des marchés avec les méthodes de passation et les dates de mise en œuvre : Travaux Non applicable Fournitures et services autres que les services de consultants 1 2 3 4 5 6 7 8 9 Ref Ref. Description Coût Méthode Pré Revue de Date Comment . Comp estimatif de qualificati la Banque prévue de ai res/Fin N° osant (US$) passation on (a l’ouverture de e des (oui/non) priori/a des offres prestation marchés posteriori) s 1. Coût total en US$ III. SÉLECTION DES CONSULTANTS 1. Dispositions relatives aux seuils de revue préalable des marchés : Décisions de sélection sujet à la revue préalable de la Banquet comme indiqué dans l’annexe 1 du Guide de Sélection et d’Emploi des Consultants par les Emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID. Méthode de Seuils de revue a priori Observations sélection/Catégories de Montants estimatifs des marchés contrats en millions de dollars américains Méthode compétitive/Firmes de >= 0.5 consultants Entente directe/firmes de Les justifications pour consultants >= 0.5 l’entente directe devront être jointes et approuvées Entente avec le PPM directe/Consultants >= 0.2 individuel Méthode Compétitive >= 0.2 (Comparaison de CVs)/ Consultants individuels 2. Liste restreinte composée entièrement de firmes nationales: La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du paragraphe 2.7 des Directives de Sélection et d’Emploi des Consultants, et l’Emprunteur ne procède pas à une publication dans UNDB. 3. Autre arrangement spécial de Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; cependant, ce seuil ne devrait pas dépasser la contre-valeur de USD 300,000 sauf dans des cas exceptionnels prévus au paragraphe 3.7 des directives pour la sélection et l’emploi des consultants par les emprunteurs de la Banque Mondiale dans le cadre des Prêts de la BIRD et des Crédits et Dons de l’AID. 4. Liste des Consultations, avec les méthodes de sélection et le calendrier de mise en œuvre : 1. 1 2. 3. 4. 5. 6. 7. 8. Ref Ref. Description des missions Coût Méthode Revue de Date Comment . Comp estimatif de la Banque prévue de ai res/Fin N° osant (US$) sélection (a soumission de e priori/a des prestation posteriori) proposition s s 1. Coût total en US$ Lexique des Sigles et Abréviations PPM : Plan de Passation des Marchés AOI : Appel d’Offres International AON : Appel d’Offres National DC : Demande de Cotations SFQC : Sélection Fondée sur la Qualité et le Coût SFQ : Sélection Fondée sur la Qualité SQC Sélection fondée sur les Qualifications des : Consultants SMC : Sélection au Moindre Coût CI : Consultant Individuel ED : Sélection Directe ou Entente Directe A Revue a posteriori : posteriori A Priori : Revue a priori PPM : Plan de Passation des Marchés DNCMP : Direction Nationale de Contrôle des Marchés Publics ARMP : Autorité de Régulation des Marchés Publics PROCUREMENT Togo : Trade and Logistics Services Competitiveness Project PLAN General Information Country: Togo 2017-12-02 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P158982 GPN Date: 2017-08-04 Project Name: Trade and Logistics Services Competitiveness Project Loan / Credit No: IDA / 60310, IDA / V0380 Project Coordination Unit of the Ministry in charge of Planning Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 93 / Construction d'un centr Strengthening the road tran e de formation et de perfecti Single Stage - One E 2020-01-2 IDA / 60310 sport and logistics services s Post Request for Bids Open - National 500,000.00 409,489.35 Signed 2019-04-10 2019-12-20 2019-04-15 2019-05-27 2020-02-05 2019-06-26 2020-04-23 2019-07-31 2020-07-28 onnement aux métiers du tra nvelope 7 ector nsport et de la logistique 35 / Construction d'un centr Strengthening the road tran Single Stage - One E 2019-05-1 e de contrôle technique pour IDA / 60310 sport and logistics services s Post Request for Bids Open - National 350,000.00 0.00 Canceled 2018-08-07 2018-08-14 2018-09-13 2018-10-13 2018-11-17 nvelope 6 véhicules gros porteurs et au ector tocars 29 / Construction de nouvea ux bureaux au siège de la dir Strengthening the road tran ection des transports routiers Request for Quota Single Stage - One E 2018-09-1 IDA / 60310 sport and logistics services s Post Limited 150,000.00 0.00 Canceled 2018-05-03 2019-11-26 2018-08-09 et ferroviaires (constructions tions nvelope 0 ector de 02 niveaux R+1 et R+2 s ur le bâtiment des archives d e la DTFR) 29 BIS / Construction de nou veaux bureaux au siège de la Strengthening the road tran direction des transports routi Single Stage - One E 2021-01-0 IDA / 60310 sport and logistics services s Post Request for Bids Open - National 300,000.00 170,479.76 Signed 2020-02-20 2020-03-13 2020-04-05 2020-04-10 2020-04-28 2020-05-25 2020-06-25 2020-07-06 2020-09-30 ers et ferroviaires (constructi nvelope 2 ector ons de 02 niveaux R+1 et R+ 2 sur le bâtiment des archive s de la DTFR) 113 / Réhabilitation des loca Strengthening the road tran Request for Quota Single Stage - One E 2020-10-2 IDA / 60310 Post Limited 100,000.00 59,680.20 Signed 2020-06-20 2021-07-19 2020-08-29 2021-10-31 ux de l'office de la sécurité ro sport and logistics services s tions nvelope 8 utière ector 115 / Aménagement du cent Strengthening the road tran Single Stage - One E 2021-01-3 re de contrôle technique aut IDA / 60310 sport and logistics services s Post Request for Bids Open - National 400,000.00 168,975.27 Signed 2020-05-18 2020-04-28 2020-05-23 2020-06-22 2020-06-25 2020-08-06 2020-07-23 2020-10-02 2020-12-12 nvelope 0 omobile de Lomé ector National Procure TG-PCU-MP-325063-CW-RFQ Strengthening the road tran ment Document - / Construction d'une aire d'év Single Stage - One E 2023-06-0 IDA / 60310 sport and logistics services s Post Request for Bids Open - National 1 Envelope proce 490,000.00 0.00 Canceled 2022-12-21 2022-12-26 2023-01-25 2023-02-04 2023-03-11 olution pour les véhicules-éc nvelope 9 ector ss (Non Bank-SPD oles du centre de formation d ) e la DTRF National Procure TG-PCU-MP-349273-CW-DIR Strengthening the road tran ment Document - / Réhabilitation des locaux de Under Imple 2023-06-0 IDA / 60310 sport and logistics services s Post Direct Selection Direct - National 1 Envelope proce 155,000.00 0.00 2023-03-15 2023-04-05 2023-03-20 2023-04-06 2023-04-08 l'office de la sécurité routière mentation 7 ector ss (Non Bank-SPD y compris petits travaux à la ) DTRF TG-PCU-MP-325123-CW-RFQ / Travaux additionnels au niv Strengthening the road tran Request for Quota Request for Quota Single Stage - One E 2023-02-1 eau du centre de formation a IDA / 60310 sport and logistics services s Post Limited tions (Non Bank-S 50,000.00 0.00 Canceled 2022-11-20 2023-01-15 tions nvelope 4 u métier de transport et du c ector PD) entre de contrôle technique GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 34 / Edition de manuels de s Strengthening the road tran Request for Quota Single Stage - One E écurité routière (plus déplian IDA / 60310 sport and logistics services s Post Limited 60,000.00 0.00 Canceled 2018-07-20 2018-10-24 2018-11-25 tions nvelope ts, affiches, autocollant) pour ector la sensibilisation 28 / Acquisition de matériels informatiques pour l'administ Strengthening the road tran ration du sous-secteur des tr Single Stage - One E IDA / 60310 sport and logistics services s Post Request for Bids Open - National 140,000.00 163,814.06 Completed 2018-02-08 2019-02-06 2018-02-15 2018-03-18 2019-03-13 2018-04-19 2019-04-30 2018-05-24 2019-07-30 2018-06-26 2019-11-28 ansports routiers et pour le nvelope ector ministère de l'enseignement technique et de la formation professionnelle 25 / Acquisition de 4 véhicul es : 3 pick-up : 140 000- 1 st ation wagon: 60000 pour l'ad Strengthening the road tran ministration des transports r Single Stage - One E IDA / 60310 sport and logistics services s Post Request for Bids Open - National 300,000.00 330,331.69 Signed 2018-01-31 2019-01-25 2018-02-05 2018-03-12 2019-03-06 2018-04-11 2019-04-30 2018-05-16 2019-07-26 2018-07-16 outiers et Acquisition d'un vé nvelope ector hicule de 25 places : 100 000 pour les missions de facilitati on du comité national de faci litation des transports 47 / Acquisitions de mobilier Strengthening the road tran Request for Quota Single Stage - One E s de bureau pour l'Office nati IDA / 60310 sport and logistics services s Post Limited 40,000.00 14,018.19 Signed 2019-01-28 2019-04-19 2019-03-25 2019-07-03 2019-09-21 tions nvelope onal de sécurité routière ector 26 / Acquisitions de matériel Strengthening the road tran Request for Quota Single Stage - One E s informatiques pour l'office IDA / 60310 sport and logistics services s Post Limited 60,000.00 67,742.59 Completed 2018-11-29 2019-02-19 2019-03-06 2019-07-08 2019-04-05 2019-11-08 tions nvelope de sécurité routière ector 39 / Acquisition des lecteurs de codes-barres afin de facili Request for Quota Single Stage - One E IDA / 60310 Improving trade facilitation Post Limited 80,000.00 0.00 Canceled 2018-09-12 2018-12-18 2019-02-18 ter la délivrance des bons de tions nvelope sortie et les TI (au moins 100 unités) 55 / Acquisition de matériels et accessoires pour l'entretie Request for Quota Single Stage - One E IDA / 60310 Project management Post Limited 2,000.00 0.00 Canceled 2018-03-26 2018-05-07 2018-05-22 n des bureaux du siège du Pr tions nvelope ojet compétitivité P158982 78 / Acquisition d'une moto Request for Quota Single Stage - One E pour les courses de l'unité de IDA / 60310 Project management Post Limited 5,000.00 2,938.65 Completed 2019-01-26 2019-01-23 2019-03-30 2019-02-25 2019-04-13 2019-04-02 tions nvelope coordination du projet. Page 1 46 / Acquisition de matériels Strengthening the road tran et mobiliers de bureaux pour Request for Quota Single Stage - One E IDA / 60310 sport and logistics services s Post Limited 80,000.00 29,787.74 Completed 2018-02-26 2019-05-08 2018-04-23 2019-07-08 2018-10-22 2019-10-02 l'administration du sous-sect tions nvelope ector eur des transports routiers 95 / Câblage, fourniture et i nstallation de matériels infor Single Stage - One E IDA / 60310 Improving trade facilitation Post Request for Bids Open - National 200,000.00 0.00 Canceled 2019-07-22 2019-07-27 2019-09-07 2019-10-07 2019-11-11 2020-01-10 matiques des bureaux de do nvelope uane de Sokodé et de Dapao ng 88 / Acquisition de matériels Strengthening the road tran informatiques pour l'utilisatio Single Stage - One E IDA / 60310 sport and logistics services s Post Request for Bids Open - National 100,000.00 0.00 Canceled 2019-04-09 2019-04-14 2019-05-26 2019-07-10 2019-08-14 2019-10-13 n du logiciel DRIVER de la DT nvelope ector RF, pour le CNFT, pour le CNF E et l'UCP du projet 91 / Acquisition de mobiliers de bureaux pour le sécretaria Request for Quota Single Stage - One E IDA / 60310 Improving trade facilitation Post Limited 38,000.00 18,469.03 Signed 2019-03-10 2019-09-02 2019-05-05 2019-11-21 2019-07-04 t du CNFE, pour le bureau du tions nvelope CNFT et pour l'Unité de coord ination du projet. 89 / Acquisition d'un véhicul Strengthening the road tran e 4x4 station wagon complé Request for Quota Single Stage - One E IDA / 60310 sport and logistics services s Post Limited 100,000.00 0.00 Canceled 2019-03-10 2019-05-05 2019-07-04 mentaire pour la DTRF et d'u tions nvelope ector n pickup pour le secrétariat d u CNFE. 88 BIS / Acquisition de maté Request for Quota Single Stage - One E riels informatiques pour le C IDA / 60310 Improving trade facilitation Post Limited 60,000.00 48,223.25 Completed 2019-06-18 2019-09-02 2019-09-10 2019-11-21 2019-11-09 2020-01-10 tions nvelope NFT, pour le CNFE et l'UCP du projet 96 / Acquisition des équipem Strengthening the road tran ents de vidéoconférence pou Request for Quota Single Stage - One E IDA / 60310 sport and logistics services s Post Limited 10,000.00 0.00 Canceled 2019-09-30 2019-11-25 2020-01-24 r la direction des transports r tions nvelope ector outiers et ferroviaires 102 / Acquisition d'équipem ents et de matériels pour le c ontrôle technique des véhicul Strengthening the road tran UN Agencies (Dire es (bancs de contrôle du frei IDA / 60310 sport and logistics services s Prior Direct 4,478,000.00 5,011,011.00 Signed 2020-01-28 2020-02-10 2020-02-02 2020-02-12 2020-02-21 2020-05-20 2020-06-20 ct) nage, ripage, station mobile ector de contrôle technique autom obile etc) et de quatre véhicu les- école pour la DTRF. 126 / Acquisition de 100 lect Request for Quota Single Stage - One E IDA / 60310 Improving trade facilitation Post Limited 70,000.00 14,253.04 Completed 2020-05-25 2020-06-17 2020-08-03 2020-11-19 2020-11-01 2021-03-02 eurs de codes barres pour l'O tions nvelope TR 114 / Acquisition de cinq (05 Strengthening the road tran Single Stage - One E IDA / 60310 Post Request for Bids Open - National 120,000.00 86,214.42 Signed 2020-04-15 2020-04-29 2020-04-30 2020-05-30 2020-06-12 2020-07-06 2020-07-07 2020-08-10 2020-12-08 2020-11-08 ) appareils de comptage de t sport and logistics services s nvelope rafic routier ector 132 / Acquisition d'un véhicu Request for Quota Single Stage - One E le 4x4 double cabine pour la IDA / 60310 Improving trade facilitation Post Limited 50,000.00 29,670.24 Completed 2020-12-12 2021-01-12 2021-02-13 2021-05-01 2021-03-15 2021-06-30 tions nvelope cellule climat des affaires 133 / Acquisition de matériel s informatiques pour le burea u du port (OTR), la direction Single Stage - One E IDA / 60310 Improving trade facilitation Post Request for Bids Open - National 104,000.00 118,293.02 Completed 2020-12-14 2020-12-17 2020-12-19 2021-01-18 2021-01-29 2021-03-04 2021-03-10 2021-04-08 2021-05-11 2021-07-07 2021-09-02 de l'industrie, le bureau des nvelope avocats, le service technique de la mairie de Lomé et le ce llule climat des affaires 144 / Acquisition et installati on du matériel informatique Single Stage - One E IDA / 60310 Improving trade facilitation Post Request for Bids Open - National 150,000.00 183,076.74 Signed 2021-03-22 2021-07-22 2021-03-27 2021-04-26 2021-08-27 2021-06-10 2021-09-20 2021-07-15 2021-12-24 2021-11-12 pour le centre d'appel au po nvelope rt autonome de Lomé 146 / Acquisition de matériel s informatiques pour le centr e de formation aux métiers d Strengthening the road tran Single Stage - One E u transport routier, l'Office T IDA / 60310 sport and logistics services s Post Request for Bids Open - National 294,000.00 290,548.45 Signed 2021-07-15 2021-08-16 2021-07-20 2021-08-31 2021-09-22 2021-11-09 2021-12-15 2021-12-14 2022-03-07 2022-03-14 nvelope ogolais des Recettes (OTR), l ector e Comité national de facilitati on des échanges et la directi on des transports routiers 147 / Acquisition de mobilier Strengthening the road tran Request for Quota Single Stage - One E s de bureaux pour le centre d IDA / 60310 sport and logistics services s Post Limited 96,000.00 0.00 Canceled 2021-07-20 2021-10-07 2021-12-06 tions nvelope e formation aux métiers du tr ector ansport routier 148 / Acquisition d'un véhicu Strengthening the road tran Request for Quota Single Stage - One E le Pickup 4X4 pour le centre IDA / 60310 sport and logistics services s Post Limited 50,000.00 26,177.17 Completed 2021-08-15 2021-09-06 2021-11-02 2021-12-07 2022-01-01 2022-03-24 tions nvelope de formation aux métiers du ector transport routier 147 BIS / Acquisition de mob Strengthening the road tran iliers de bureaux pour le cent Single Stage - One E IDA / 60310 sport and logistics services s Post Request for Bids Open - National 160,000.00 87,026.79 Signed 2021-10-15 2021-10-05 2021-10-20 2021-11-19 2021-11-17 2022-01-03 2021-12-16 2022-03-10 2022-02-23 2022-05-09 re de formation aux métiers nvelope ector de transport routier TG-PCU-MP-318569-GO-RFQ Strengthening the road tran / Fournitures et pose de ridea Request for Quota Single Stage - One E IDA / 60310 sport and logistics services s Post Limited 10,000.00 0.00 Signed 2022-10-05 2023-02-15 2022-11-30 2022-12-15 ux au niveau du bâtiment du tions nvelope ector centre de formation des méti ers 152 / Acquisition de matériel Strengthening the road tran Single Stage - One E s informatiques pour les six s IDA / 60310 sport and logistics services s Post Request for Bids Open - National 280,000.00 0.00 Canceled 2021-11-30 2021-12-05 2022-01-14 2022-02-28 2022-04-30 2022-06-29 nvelope ites de visite technique ector TG-PCU-MP-315472-GO-RFQ / Acquisition de matériels inf Request for Quota Single Stage - One E Under Imple IDA / 60310 Improving trade facilitation Post Limited 23,000.00 0.00 2022-12-20 2023-02-15 2023-02-14 2023-03-16 ormatiques pour le secrétaria tions nvelope mentation t général du ministère du pla n TG-PCU-MP-315462-GO-RFB / Acquisition de panneaux m Single Stage - One E IDA / 60310 Improving trade facilitation Post Request for Bids Open - National 175,000.00 0.00 Canceled 2022-09-30 2022-10-05 2022-11-16 2022-12-16 2023-01-20 2023-05-20 étalliques pour le marquage nvelope du plan local d’urbanisme de AVE 2 et du ZIO 2 TG-PCU-MP-350424-GO-RFQ / Acquisition de matériels inf Strengthening the road tran Request for Quota Single Stage - One E Under Imple ormatiques (serveurs et ordi IDA / 60310 sport and logistics services s Post Limited 95,000.00 0.00 2023-03-27 2023-05-22 2023-07-06 tions nvelope mentation nateurs) pour le RCCM, pour l ector e permis de construire et la CATO Page 2 TG-PCU-MP-349265-GO-RFQ Strengthening the road tran / Acquisition d'un véhicule PI Request for Quota Single Stage - One E Under Imple IDA / 60310 sport and logistics services s Post Limited 50,000.00 0.00 2023-04-24 2023-04-24 2023-06-08 2023-06-23 CK UP 4X4 double cabine pou tions nvelope mentation ector r la direction des transports r outiers et ferroviaires NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 27 / Edition du recueil de tex Strengthening the road tran tes actualisés sur les transpo Request for Quota Single Stage - One E Pending Impl IDA / 60310 sport and logistics services s Post Limited 100,000.00 0.00 2018-07-03 2018-08-28 2018-09-27 rts routiers et de la charte afr tions nvelope ementation ector icaine sur la sécurité routière 53 / Recrutement d'un servic e de gardiennage pour la séc Request for Quota Single Stage - One E IDA / 60310 Project management Post Limited 14,000.00 6,853.63 Signed 2018-03-26 2018-11-22 2018-05-07 2019-04-02 2019-05-07 urité du siège du Projet comp tions nvelope étitivité P158982 pour une p ériode de 02 ans. 54 / Recrutement d'un servic e pour l'entretien des bureau Request for Quota Single Stage - One E IDA / 60310 Project management Post Limited 13,000.00 6,338.17 Signed 2018-04-02 2018-11-22 2018-05-14 2019-04-24 2019-05-14 x du siège du Projet compétit tions nvelope ivité pour une période de 0 2 ans. 92 / Édition du bulletin d'info rmation du sous secteur des Strengthening the road tran Request for Quota Single Stage - One E transports routiers, du code IDA / 60310 sport and logistics services s Post Limited 96,000.00 0.00 Canceled 2019-03-03 2019-04-28 2019-06-27 tions nvelope des douanes et des supports ector sur la facilitation des échang es 94 / Assurance tout risque d Strengthening the road tran u matériel roulant de l'UCP, d Request for Quota Single Stage - One E IDA / 60310 sport and logistics services s Post Limited 50,000.00 14,778.63 Signed 2019-03-02 2019-11-07 2019-04-27 2020-01-09 2020-04-21 e la direction des transports r tions nvelope ector outiers et ferroviaires et du s ecrétariat du CNFE 92 BIS / Édition du code des Request for Quota Single Stage - One E douanes et des supports sur l IDA / 60310 Improving trade facilitation Post Limited 76,000.00 57,520.40 Signed 2019-06-21 2019-07-11 2019-09-13 2019-10-07 2019-10-13 tions nvelope a facilitation des échanges 135 / Edition de 1000 magaz Request for Quota Single Stage - One E IDA / 60310 Improving trade facilitation Post Limited 16,000.00 13,952.50 Signed 2020-12-19 2020-12-15 2021-02-20 2021-03-05 2021-04-21 ine de la semaine du secteur tions nvelope privé 154 / Reproduction du rappo rt final de l' ETNM 2020 (500 exemplaires) , de dépliants ( 500) sur le guide ETNM, la p Request for Quota Single Stage - One E Pending Impl IDA / 60310 Improving trade facilitation Post Limited 90,000.00 0.00 2021-12-05 2022-02-07 2022-04-08 rocédure de dédouanement tions nvelope ementation des véhicules et des marcha ndises , décisions anticipées (200) , du manuel des procéd ures douanières (1500 exem plaires CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 24 / Audit du projet : Exercic e 1: Exercice 2018 y compris le PFF Exercice 2: 1 janvier a Least Cost Selecti u 31 décembre 2019- Exercic IDA / V0380 Project management Post Open - National 10,000.00 8,979.24 Completed 2017-09-04 2017-10-09 2017-09-25 2017-11-08 2018-01-31 2017-12-06 2018-03-02 2018-01-05 2018-09-19 2018-02-09 2019-02-06 2018-03-16 2019-03-27 2018-09-12 2021-06-14 on e 3: 1 janvier au 31 décembr e 2020: activité prise en com pte sur le PPF mais avec un montant de 10 000 dollar US 12N / Recrutement d'un cabi net pour le contrôle des trav aux de construction du centr Strengthening the road tran Consultant Qualifi e de formation aux métiers d IDA / 60310 sport and logistics services s Post Open - National 54,000.00 53,271.33 Signed 2018-03-30 2019-06-14 2018-04-20 2018-05-25 2019-08-21 2018-06-15 2019-09-23 2018-07-20 2019-11-21 2019-04-16 cation Selection u transport et de la logistique ector et pour le contrôle des trava ux de construction de nouve aux bureaux au siège de la D TRF 7 / Road security and progra Fixed Budget Sele Open - Internationa IDA / V0380 Improving trade facilitation Post 150,000.00 0.00 Canceled 2017-05-08 2017-05-29 2017-07-12 2017-08-09 2017-09-08 2017-10-13 2017-11-17 2018-11-17 mm policy ction l 83 / Recrutement d'un cabin Strengthening the road tran et pour l'audit du système inf Consultant Qualifi IDA / 60310 sport and logistics services s Post Open - National 50,000.00 40,926.09 Signed 2019-04-08 2019-05-28 2019-04-29 2019-06-12 2019-08-21 2019-07-12 2019-09-19 2019-08-16 2019-11-28 2019-09-15 ormatique de la Direction de cation Selection ector s Transports Routiers et Ferr oviaires. 81 / Recrutement d'un cabin Strengthening the road tran Consultant Qualifi Open - Internationa et pour la mise en place de l IDA / 60310 sport and logistics services s Post 100,000.00 99,782.67 Signed 2019-03-20 2019-05-20 2019-04-03 2019-06-18 2019-05-17 2019-08-21 2019-06-16 2019-09-19 2019-07-21 2019-11-28 2019-11-18 cation Selection l a base de données des trans ector ports terrestres. 82 / Recrutement d'un consu ltant individuel pour l'adapta Strengthening the road tran Consultant Qualifi tion de manuels de sécurité r IDA / 60310 sport and logistics services s Post Open - National 30,000.00 0.00 Canceled 2019-03-25 2019-04-15 2019-05-29 2019-06-28 2019-08-02 2019-09-01 cation Selection outière existants dans la sou ector s région à l'usage des élèves du Togo. 84 / Recrutement d'un cabin Strengthening the road tran et pour l'étude de viabilité co Consultant Qualifi Open - Internationa IDA / 60310 sport and logistics services s Post 180,000.00 347,896.74 Signed 2019-03-11 2019-06-11 2019-03-25 2019-06-13 2019-05-08 2020-03-04 2019-06-07 2020-08-13 2019-07-12 2021-01-01 2019-11-09 mmerciale pour la mise en pl cation Selection l ector ace d'un système de casse d es camions. 87 / Recrutement d'un consu Strengthening the road tran Consultant Qualifi Open - Internationa IDA / 60310 Post 160,000.00 140,435.58 Signed 2019-04-10 2019-05-13 2019-04-24 2019-06-18 2019-06-07 2019-08-21 2019-07-07 2019-09-27 2019-08-11 2019-11-21 2019-12-09 ltant pour l'enquête de satisf sport and logistics services s cation Selection l action ector 101 / Recrutement d'un cabi net pour la mise en place d'u Strengthening the road tran ne application informatique p Consultant Qualifi IDA / 60310 sport and logistics services s Post Open - National 90,000.00 0.00 Under Review 2019-12-10 2020-04-01 2019-12-31 2020-02-13 2020-03-14 2020-04-18 2020-06-17 our la collecte, le traitement cation Selection ector et l'analyse des données d'ac cidents de la circulation routi ère Page 3 82BIS BIS / Recrutement d'u n consultant (cabinet) pour l' Strengthening the road tran Consultant Qualifi adaptation de manuels de sé IDA / 60310 sport and logistics services s Post Open - National 60,000.00 0.00 Canceled 2019-06-13 2019-05-20 2019-06-27 2019-08-10 2019-09-09 2019-10-23 2019-12-22 cation Selection curité routière existants dans ector la sous région à l'usage des é lèves du Togo. 112 / Recrutement d'un cabi Strengthening the road tran net pour le développement e Consultant Qualifi IDA / 60310 sport and logistics services s Post Open - National 60,000.00 0.00 Under Review 2020-03-02 2020-04-01 2020-04-06 2020-06-04 2020-07-04 2020-08-08 2020-11-06 t l'installation d'une applicati cation Selection ector on de gestion des frets 104 / Actualisation des Étud es d'Impact Environnemental et Social (EIES) et Plan d'Acti Strengthening the road tran ons de Réinstallation (PAR) p Consultant Qualifi Open - Internationa IDA / 60310 sport and logistics services s Post 262,500.00 0.00 Canceled 2020-02-21 2020-03-27 2020-05-25 2020-06-24 2020-07-29 2020-11-26 our les travaux de réhabilitati cation Selection l ector on et de renforcement de la Route Nationale n°1 (RN1) su r le tronçon Aouda-Kara y co mpris les aires de dégageme nt 128 / consultant externe pou Least Cost Selecti r l'audit financier et comptabl IDA / 60310 Project management Post Open - National 50,000.00 12,215.97 Signed 2020-09-25 2020-12-11 2020-10-30 2021-01-13 2021-04-20 2021-01-14 2021-05-20 2021-03-05 2021-06-04 2021-03-13 2021-10-27 2021-04-17 2021-12-17 2022-12-28 on e du projet pour les exercices 2021 et 2022 127 / Consultant pour la sur veillance et le contrôle des tr avaux de réaménagement du Strengthening the road tran Consultant Qualifi centre de contrôle technique IDA / 60310 sport and logistics services s Post Open - National 50,000.00 57,986.39 Signed 2020-07-15 2020-09-14 2020-08-19 2020-10-17 2020-11-30 2020-11-16 2021-01-25 2020-12-21 2021-04-05 2021-06-19 cation Selection des véhicules à Lomé et la ré ector habilitation des bureaux de l' Office National de Sécurité R outière 103 / Actualisation des étud es technico-économiques et d'élaboration du dossier d'ap Strengthening the road tran pel d'offres pour les travaux Quality And Cost- Open - Internationa IDA / 60310 sport and logistics services s Post 393,500.00 0.00 Canceled 2020-02-21 2020-03-27 2020-03-27 2020-06-20 2020-06-25 2020-08-06 2020-09-24 2020-10-29 2021-02-26 de réhabilitation et de renfor Based Selection l ector cement de la Route National e n°1 (RN1) sur le tronçon Ao uda-Kara y compris les aires de dégagement (140km) 106 / Etude logistique du cor Strengthening the road tran ridor Lomé-Cinkassé et de vi Quality And Cost- Open - Internationa IDA / 60310 sport and logistics services s Post 385,000.00 0.00 Canceled 2020-04-06 2020-05-11 2020-08-06 2020-08-07 2020-09-21 2020-10-26 2020-11-30 2021-02-28 abilité économique de la plat Based Selection l ector eforme logistique multiservic e et du port sec. 105 / Étude technico-écono mique et élaboration du dos Strengthening the road tran sier d'appel d'offres pour les Quality And Cost- Open - Internationa IDA / 60310 sport and logistics services s Post 394,000.00 0.00 Canceled 2020-04-10 2020-05-15 2020-08-10 2020-08-11 2020-09-25 2020-10-30 2020-12-04 2021-03-04 travaux d'aménagement et d Based Selection l ector e bitumage de 175 km de pis tes d'accès aux Agropoles de Kara et de l'Oti 109 / Étude diagnostic et d’o Strengthening the road tran Consultant Qualifi Open - Internationa IDA / 60310 Post 300,000.00 412,405.44 Terminated 2020-07-30 2020-08-07 2020-09-03 2020-08-12 2020-11-01 2020-10-07 2020-12-01 2020-11-23 2021-01-05 2021-01-05 2021-05-05 ptimisation PCJ de Cinkassé sport and logistics services s cation Selection l ector 103 BIS / Actualisation des é tudes technico-économiques et d'élaboration du dossier d' Strengthening the road tran appel d'offres pour les travau Consultant Qualifi Open - Internationa IDA / 60310 sport and logistics services s Post 393,500.00 354,039.95 Signed 2020-07-15 2020-09-23 2020-08-19 2020-09-24 2020-10-17 2020-12-03 2020-11-16 2021-05-11 2020-12-21 2021-07-03 2021-04-20 x de réhabilitation et de renf cation Selection l ector orcement de la Route Nation ale n°1 (RN1) sur le tronçon Aouda-Kara y compris les air es de dégagement (140km) 106 BIS / Etude logistique du Strengthening the road tran corridor Lomé-Cinkassé et de Consultant Qualifi Open - Internationa IDA / 60310 sport and logistics services s Post 385,000.00 332,205.74 Signed 2020-07-30 2020-08-07 2020-09-03 2020-08-11 2020-11-01 2020-11-03 2020-12-01 2021-01-18 2021-01-05 2021-03-25 2021-05-05 viabilité économique de la pl cation Selection l ector ateforme logistique multiserv ice et du port sec. 120 BIS / Élaboration de l'ét Strengthening the road tran ude d'impact environnement Consultant Qualifi IDA / 60310 sport and logistics services s Post Open - National 80,000.00 58,717.28 Signed 2020-10-15 2020-10-20 2020-11-05 2020-12-10 2020-12-03 2021-01-14 2020-12-31 2021-02-18 2021-03-31 2021-04-04 al et social des travaux d'am cation Selection ector énagement du tronçon Aoud a-Kara 131 / Élaboration du plan d'e ngagement des parties prena Strengthening the road tran ntes et du plan de gestion de Consultant Qualifi Open - Internationa IDA / 60310 sport and logistics services s Post 124,400.00 83,380.53 Signed 2020-10-15 2020-10-12 2020-11-05 2020-10-21 2020-12-10 2020-12-03 2021-01-14 2021-01-08 2021-02-18 2021-03-25 2021-04-04 la main d’œuvre du projet ré cation Selection l ector gional corridor économique L omé-Ouagadougou-Niamey 107 / Audit de sécurité routi Strengthening the road tran Consultant Qualifi Open - Internationa IDA / 60310 Post 76,800.00 0.00 Canceled 2020-02-24 2020-04-01 2020-03-30 2020-05-28 2020-06-27 2020-08-01 2020-09-30 ère sur l’axe Lomé-Cinkassé sport and logistics services s cation Selection l ector 108 / Étude pour la mise en Strengthening the road tran place d’un système d’inform Consultant Qualifi IDA / 60310 sport and logistics services s Post Open - National 79,000.00 0.00 Canceled 2020-04-03 2020-05-08 2020-07-06 2020-08-05 2020-09-09 2020-11-08 ation intelligent sur la partie cation Selection ector togolaise du corridor Lomé- Ouaga-Niamey 140 / Mise à jour de l'applica tion du système intégré de g Consultant Qualifi estion du permis de construir IDA / 60310 Improving trade facilitation Post Open - National 40,000.00 28,161.35 Signed 2021-01-28 2021-02-18 2021-02-18 2021-04-03 2021-04-20 2021-05-03 2021-05-25 2021-06-07 2021-07-16 2021-07-07 cation Selection e (SIGPC) au profit de la cellu le technique de mairie de Lo mé 143 / Mise à jour des plates f ormes électroniques du Regi stre du Commerce et du Cré Consultant Qualifi IDA / 60310 Improving trade facilitation Post Open - National 45,000.00 34,183.11 Signed 2021-02-22 2021-02-18 2021-03-15 2021-04-28 2021-04-26 2021-05-28 2021-05-25 2021-07-02 2021-07-19 2021-08-01 dit Mobilier (RCCM) et du trib cation Selection unal de commerce de Lomé avec de nouvelles fonctionna lités 139 / Etude et délimitation d Consultant Qualifi Open - Internationa IDA / 60310 Improving trade facilitation Post 200,000.00 138,706.82 Signed 2021-02-22 2021-06-30 2021-03-08 2021-08-20 2021-04-21 2021-10-15 2021-05-21 2021-11-17 2021-06-25 2021-12-31 2021-12-22 e la propriété immobilière de cation Selection l l'Etat 138 / Recrutement d'un cabi Consultant Qualifi net pour la formation de 60 a IDA / 60310 Improving trade facilitation Post Open - National 80,000.00 48,436.89 Completed 2021-02-22 2021-02-18 2021-03-08 2021-04-21 2021-04-20 2021-05-26 2021-05-26 2021-06-30 2021-08-03 2021-07-20 2021-12-11 cation Selection cteurs en logistique portuaire et maritime 111 / Recrutement d'un cabi Strengthening the road tran net pour l'élaboration des ma Quality And Cost- IDA / 60310 sport and logistics services s Post Open - National 50,000.00 36,393.96 Completed 2021-03-22 2021-03-02 2021-04-26 2021-07-10 2021-05-28 2021-07-11 2021-06-30 2021-08-25 2021-07-09 2021-10-01 2021-09-02 2021-11-05 2021-10-13 2021-12-20 2022-04-14 nuels d'exécution, de procéd Based Selection ector ures administratives et finan cières Page 4 134 / Evaluation des coûts d Consultant Qualifi e passage des marchandises IDA / 60310 Improving trade facilitation Post Open - National 96,000.00 0.00 Canceled 2020-12-14 2020-12-28 2021-02-10 2021-03-17 2021-04-21 2021-06-20 cation Selection au port autonome de Lomé 151 / Recrutement d'un cabi net pour l'enquête de satisfa Consultant Qualifi Open - Internationa IDA / 60310 Project management Post 120,000.00 111,735.70 Signed 2021-07-15 2021-10-21 2021-08-05 2021-11-25 2021-10-18 2022-01-13 2021-11-17 2022-02-11 2021-12-22 2022-03-22 2022-02-05 ction des bénéficiaires en vu cation Selection l e de l'évaluation finale du pr ojet 105 BIS / Étude technico-éco nomique et élaboration du do Strengthening the road tran ssier d'appel d'offres pour les Consultant Qualifi IDA / 60310 sport and logistics services s Post 394,000.00 0.00 Canceled 2020-07-27 2021-06-07 2020-08-31 2020-10-29 2020-11-28 2021-01-02 2021-05-02 travaux d'aménagement et d cation Selection ector e bitumage de 175 km de pis tes d'accès aux Agropoles de Kara et de l'Oti 123 / Recrutement d'un cabi net pour l'élaboration du pla Strengthening the road tran n d'actions de réinstallation p Consultant Qualifi Open - Internationa IDA / 60310 sport and logistics services s Post 100,000.00 0.00 Canceled 2020-08-14 2020-09-18 2020-11-16 2020-12-16 2021-01-20 2021-03-06 our les travaux d'aménagem cation Selection l ector ent et de bitumage de 175 k m de pistes d’accès aux agro poles de Kara et de l'Oti 122 / Recrutement d'un cabi net pour les études d'impact Strengthening the road tran environnemental et social po Consultant Qualifi Open - Internationa IDA / 60310 sport and logistics services s Post 100,000.00 0.00 Canceled 2020-08-14 2020-09-18 2020-11-16 2020-12-16 2021-01-20 2021-03-06 ur les travaux d'aménageme cation Selection l ector nt et de bitumage de 175 km de pistes d'accès aux agropol es de Kara et de l'Oti TG-PCU-MP-318575-CS-CQS Strengthening the road tran / Etude d’Avant-Projet Somm Consultant Qualifi Open - Internationa IDA / 60310 sport and logistics services s Post 120,000.00 0.00 Canceled 2022-11-07 2022-11-28 2023-01-11 2023-02-10 2023-03-17 2023-06-15 aire (APS) pour la constructio cation Selection l ector n du parking à camions de Ts évié TG-PCU-MP-316802-CS-CQS / Contrôle et surveillance des Strengthening the road tran Consultant Qualifi travaux de construction d'un IDA / 60310 sport and logistics services s Post Open - National 34,000.00 0.00 Canceled 2022-10-04 2022-10-25 2022-12-08 2023-01-07 2023-02-11 2023-06-11 cation Selection e aire d'évolution pour les vé ector hicules-écoles du centre de f ormation TG-PCU-MP-325072-CS-CQS Consultant Qualifi Open - Internationa / ETUDE STRATEGIQUE POUR IDA / 60310 Improving trade facilitation Post 90,000.00 0.00 Canceled 2022-11-16 2023-01-31 2022-12-07 2023-01-20 2023-02-19 2023-03-26 2023-06-24 cation Selection l POLITIQUE DE L'INVESTISSEM ENT AU TOGO INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 23 / Etude pour la mise en Individual Consult œuvre du Statut d'Opérateur IDA / 60310 Improving trade facilitation Post Limited 48,000.00 0.00 Canceled 2018-04-06 2018-04-13 2018-07-10 2018-08-14 2018-10-14 ant Selection s économiques 45 / Recrutement d'un consu Strengthening the road tran ltant individuel pour l'assista Individual Consult IDA / V0380 sport and logistics services s Post Limited 40,000.00 50,275.35 Signed 2017-08-31 2017-08-31 2017-09-05 2017-09-19 2017-09-13 2017-10-13 2017-12-28 2018-06-20 2018-02-26 nce technique auprès des ba ant Selection ector nques sur le crédit-bail (phas e 1) 11 / Etude d'impact environn emental et social pour la con struction d'un centre de form Strengthening the road tran ation aux métiers du transpo Individual Consult IDA / 60310 sport and logistics services s Post Limited 40,000.00 33,449.80 Completed 2017-12-07 2018-01-19 2017-12-14 2018-03-07 2018-03-18 2018-03-08 2018-04-05 2019-01-22 2018-06-04 2019-10-10 rt et de la logistique et pour l ant Selection ector a construction de nouveaux bureaux au siège de la direct ion des transports routiers et ferroviaires 8 / Élaboration d'un docume Strengthening the road tran nt projet pour le rajeunissem Individual Consult IDA / 60310 sport and logistics services s Post Limited 40,000.00 0.00 Canceled 2018-02-22 2018-03-01 2018-03-22 2018-06-21 2018-09-19 ent du parc automobile de tr ant Selection ector ansport de marchandises 48 / Recrutement d'un cabin et international (IRU) pour la revue et actualisation des te Strengthening the road tran Direct - Internation xtes législatifs et réglementa IDA / 60310 sport and logistics services s Prior Direct Selection 3,000,000.00 0.00 Canceled 2018-01-26 2018-02-09 2018-02-16 2018-03-30 2022-03-29 al ires du sous secteur des tran ector sports routiers, pour l'assista nce technique en vue de la mise en route du centre de f ormation .... 12 / Recrutement d'un consu ltant individuel pour le contrô Strengthening the road tran Individual Consult le des travaux de constructio IDA / 60310 sport and logistics services s Post Limited 40,000.00 0.00 Canceled 2018-01-05 2018-01-12 2018-04-06 2018-05-04 2019-01-29 ant Selection n du centre de formation aux ector métiers du transport et de la logistique 13 / Recrutement d'un consu Strengthening the road tran ltant individuel pour le contrô Individual Consult IDA / 60310 sport and logistics services s Post Limited 14,000.00 0.00 Canceled 2018-01-05 2018-01-12 2018-04-06 2018-05-04 2019-01-29 le des travaux de constructio ant Selection ector n de nouveaux bureaux au si ège de la DTRF 51 / Recrutement d'un cabin et international (IRU) pour la revue et actualisation des te Strengthening the road tran xtes législatifs et réglementa IDA / 60310 sport and logistics services s Prior Direct Selection Direct 3,000,000.00 2,997,318.59 Signed 2018-02-20 2018-02-19 2018-02-22 2018-06-14 2018-04-22 2019-01-22 2022-04-21 ires du sous-secteur des tran ector sports routiers, pour l'assista nce technique en vue de la mise en route du centre de f ormation .... 52 / Mission d'assistance tec Strengthening the road tran hnique par CITA dans le dom IDA / 60310 sport and logistics services s Post Direct Selection Direct 300,000.00 0.00 Canceled 2018-03-23 2018-03-29 2018-05-18 2018-08-16 aine de perfionnement de l'in ector spection technique des véhic ules au Togo 52BIS / Mission d'assistance technique par CITA auprès d Strengthening the road tran u Ministère des Infrastructure IDA / 60310 sport and logistics services s Prior Direct Selection Direct 820,000.00 1,081,976.72 Signed 2018-05-17 2018-06-18 2018-05-28 2018-04-06 2018-08-01 2019-04-02 2020-07-31 s et des Transports pour la fo ector rmalisation et la professionn alisation du sous-secteur des transports routiers Page 5 73 / Recrutement du Spécial Individual Consult IDA / 60310 Project management Post Open 50,000.00 49,635.85 Signed 2018-08-31 2018-09-03 2018-10-19 2018-12-11 2018-11-09 2018-12-17 2018-12-14 2018-12-28 2020-12-03 iste en suivi évaluation du Pr ant Selection ojet 74 / Recrutement d'une Secr Individual Consult IDA / 60310 Project management Post Open 17,000.00 13,650.20 Signed 2018-08-31 2018-09-03 2018-10-19 2018-11-30 2018-11-09 2018-12-05 2018-12-14 2018-12-26 2020-12-03 étaire pour le Projet ant Selection 75 / Recrutement d'un Cours Individual Consult IDA / 60310 Project management Post Open 6,000.00 7,595.61 Signed 2018-08-31 2018-09-03 2018-10-19 2018-11-30 2018-11-09 2018-12-06 2018-12-14 2018-12-27 2020-12-03 ier pour le Projet ant Selection 76 / Recrutement d'un Chauf Individual Consult IDA / 60310 Project management Post Open 8,000.00 7,595.61 Signed 2018-08-31 2018-09-03 2018-10-19 2018-12-03 2018-11-09 2018-12-07 2018-12-14 2018-12-26 2020-12-03 feur pour le Projet ant Selection 77 / Recrutement du deuxiè Individual Consult IDA / 60310 Project management Post Open 8,000.00 7,613.53 Signed 2018-08-31 2018-09-03 2018-10-19 2018-12-03 2018-11-09 2018-12-07 2018-12-14 2018-12-26 2020-12-03 me chauffeur pour l'UCP ant Selection 80 / Recrutement d'un consu ltant individuel en communic Strengthening the road tran Individual Consult ation pour la conception du b IDA / 60310 sport and logistics services s Post Open 10,000.00 19,904.70 Signed 2019-08-15 2020-03-13 2019-10-03 2020-06-16 2019-10-24 2020-07-27 2019-11-28 2020-09-30 2019-12-19 ant Selection ulletin d'information annuel s ector ur les transports terrestres. 86 / Recrutement d'un consu Strengthening the road tran ltant pour l'étude d'impact e Individual Consult IDA / 60310 sport and logistics services s Post Open 50,000.00 17,504.90 Signed 2019-03-18 2019-05-21 2019-05-06 2019-08-22 2019-05-27 2019-09-18 2019-07-01 2019-11-21 2019-07-31 nvironnemental pour l'opérat ant Selection ector ion de casse des camions. 90 / Recrutement d'un consu Individual Consult ltant en sauvegarde environn IDA / 60310 Project management Post Open 50,000.00 40,873.49 Signed 2019-02-25 2019-02-26 2019-04-15 2019-07-04 2019-05-06 2019-07-05 2019-06-10 2019-07-30 2021-05-30 ant Selection emental et social pour l'UCP 97 / Recrutement d'un audit Individual Consult eur interne pour l'unité de co IDA / 60310 Project management Post Open 50,000.00 42,278.07 Signed 2019-04-25 2019-06-25 2019-06-13 2019-09-19 2019-07-04 2019-09-13 2019-08-08 2019-10-30 2021-07-28 ant Selection ordination du projet 82 BIS / Recrutement d'un c onsultant individuel pour l'a Strengthening the road tran Individual Consult daptation de manuels de séc IDA / 60310 sport and logistics services s Post Open 30,000.00 0.00 Canceled 2019-04-25 2019-06-13 2019-07-04 2019-08-08 2019-09-07 ant Selection urité routière existants dans l ector a sous région à l'usage des él èves du Togo. 98 / Recrutement d'un consu ltant individuel pour l'élabora Individual Consult tion du mécanisme de foncti IDA / 60310 Improving trade facilitation Post Open 20,000.00 20,920.60 Signed 2019-05-20 2019-05-20 2019-07-08 2019-08-21 2019-07-29 2019-09-26 2019-09-02 2019-11-21 2019-11-01 ant Selection onnement du numéro vert de lutte contre les tracasseries r outières 99 / Recrutement d'un Spéci Individual Consult aliste en Gestion Financière IDA / 60310 Project management Post Open 50,000.00 42,576.18 Signed 2019-07-15 2019-08-16 2019-09-09 2019-10-04 2019-09-30 2019-10-11 2019-11-04 2019-10-30 2021-10-24 ant Selection pour l'Unité de Coordination du Projet 79 / Recrutement d'un consu ltant individuel pour la config Strengthening the road tran Individual Consult uration informatique du logici IDA / 60310 sport and logistics services s Post Open 60,000.00 0.00 Canceled 2019-03-05 2019-05-21 2019-04-23 2019-05-14 2019-06-18 2019-08-17 ant Selection el DRIVER de collecte et d'an ector alyse des données d'accident de la circulation routière. 85 / Recrutement d'un consu ltant pour l'étude d'impact e Strengthening the road tran nvironnemental et social des Individual Consult IDA / 60310 sport and logistics services s Post Open 60,000.00 0.00 Canceled 2019-04-15 2019-06-03 2019-06-24 2019-07-29 2019-09-27 centres routiers des chefs lie ant Selection ector ux des régions le long de la r oute nationale n°1 (Lomé-Da paong). 116 / Recruter un consultant individuel pour élaborer les fi Individual Consult IDA / 60310 Improving trade facilitation Post Open 32,000.00 29,664.48 Signed 2020-06-15 2020-08-17 2020-08-10 2020-10-16 2020-09-14 2020-11-23 2020-10-19 2020-12-31 2020-12-03 ches techniques des projets ant Selection des mesures de la catégorie C 117 / Recrutement d'un cons ultant individuel pour la réali Individual Consult sation d'une étude diagnosti IDA / 60310 Improving trade facilitation Post Open 52,000.00 0.00 Under Review 2020-04-30 2020-04-30 2020-06-25 2020-07-30 2020-09-03 2020-11-02 ant Selection que sur la facilitation des tra nsports et transit routier au T ogo 118 / Conception d'un site w Individual Consult IDA / 60310 Improving trade facilitation Post Open 14,000.00 12,528.95 Signed 2020-04-30 2020-04-30 2020-06-25 2020-11-24 2020-07-30 2021-01-08 2020-09-03 2021-04-02 2020-11-02 eb pour le CNF ant Selection 110 / Recrutement d'un cons Strengthening the road tran ultant individuel pour l'élabor Individual Consult IDA / 60310 sport and logistics services s Post Limited 20,000.00 25,206.66 Signed 2020-04-20 2020-04-20 2020-05-11 2020-06-02 2020-06-10 2020-09-07 2020-07-21 2020-12-08 2020-08-20 ation du PPSD du projet Lom ant Selection ector é-Ouaga-Niamey. 120 / Recrutement d'un cons Strengthening the road tran ultant individuel pour l'élabor Individual Consult IDA / 60310 sport and logistics services s Post Open 38,000.00 0.00 Canceled 2020-08-14 2020-09-16 2020-10-09 2020-11-13 2020-12-18 2021-02-01 ation de l'EIES pour le tronço ant Selection ector n Aouda-Kara y compris les a ires de dégagement 121 / Recrutement d'un cons ultant individuel pour l'élabor Strengthening the road tran Individual Consult ation du plan d'actions de réi IDA / 60310 sport and logistics services s Post Open 38,000.00 39,841.04 Signed 2020-08-14 2020-09-21 2020-10-09 2020-11-26 2020-11-13 2020-12-16 2020-12-18 2021-03-13 2021-02-01 ant Selection nstallation pour le tronçon Ao ector uda-Kara y compris les aires de dégagement 124 / Recrutement d'un cons ultant individuel pour l'élabor Strengthening the road tran Individual Consult ation du Cadre Politique de R IDA / 60310 sport and logistics services s Post Open 33,600.00 43,705.38 Signed 2020-09-21 2020-05-04 2020-11-16 2020-10-05 2020-12-21 2020-11-06 2021-01-25 2020-12-11 2021-03-11 ant Selection éinstallation du projet de corr ector idor Lomé-Ouaga-Niamey 125 / Recrutement d'un cons ultant individuel pour l'élabor Strengthening the road tran Individual Consult ation du Cadre de Gestion En IDA / 60310 sport and logistics services s Post Open 33,600.00 34,614.53 Signed 2020-09-21 2020-05-04 2020-11-16 2020-07-14 2020-12-21 2020-08-10 2021-01-25 2020-09-30 2021-03-11 ant Selection vironnemental et Social du pr ector ojet de corridor Lomé-Ouaga- Niamey 119 / Recrutement d'un cons ultant individuel pour l’élabor Individual Consult IDA / 60310 Improving trade facilitation Post Open 20,000.00 0.00 Canceled 2020-05-05 2020-06-30 2020-08-04 2020-09-08 2020-11-07 ation des guides du conducte ant Selection ur et du voyageur Page 6 130 / Etude d'évaluation séc Strengthening the road tran Individual Consult uritaire du corridor Lomé-Ou IDA / 60310 sport and logistics services s Post Open 30,000.00 28,000.19 Completed 2020-08-17 2020-08-11 2020-11-19 2020-10-05 2020-12-19 2020-10-26 2021-01-23 2020-12-09 2021-03-24 2020-12-24 ant Selection aga-Niamey ector 100 / Recrutement d'un cons ultant individuel pour l'évalu Strengthening the road tran Individual Consult ation des équipements de co IDA / 60310 sport and logistics services s Post Open 40,000.00 0.00 Canceled 2019-11-11 2019-12-30 2020-02-03 2020-03-09 2020-05-08 ant Selection ntrôle technique automobile ector de la direction des transports routiers et ferroviaires 136 / Etude diagnostique, in stitutionnelle et organisation Individual Consult nelle du centre de gestion a IDA / 60310 Improving trade facilitation Post Open 24,000.00 24,410.10 Signed 2021-01-25 2021-02-18 2021-03-15 2021-04-20 2021-04-19 2021-05-20 2021-05-24 2021-07-16 2021-06-23 ant Selection gréée de la chambre de com merce et d'industrie du Togo 141 / Développement d'une Individual Consult application mobile pour la ge IDA / 60310 Improving trade facilitation Post Open 20,000.00 11,666.59 Signed 2021-01-25 2021-02-18 2021-03-15 2021-04-20 2021-04-14 2021-05-25 2021-05-19 2021-07-17 2021-06-18 ant Selection stion des abonnés de la Togo laise Des Eaux 142 / Conception et réalisati on de nouvelles fonctionnalit Individual Consult IDA / 60310 Improving trade facilitation Post Open 20,000.00 9,445.45 Signed 2021-02-10 2021-02-18 2021-03-31 2021-04-20 2021-04-30 2021-05-19 2021-06-04 2021-07-16 2021-07-04 és du site web dynamique au ant Selection profit du Centre de Formalité s des Entreprises 134 BIS / Evaluation des coû Individual Consult ts de passage des marchandi IDA / 60310 Improving trade facilitation Post Open 60,000.00 34,595.89 Signed 2021-06-21 2021-07-26 2021-08-18 2021-11-17 2021-09-17 2021-12-15 2021-10-22 2022-02-16 2021-11-21 ant Selection ses au port autonome de Lo mé 150 / Recrutement d'un cons Individual Consult ultant individuel pour l'évalu IDA / 60310 Project management Post Open 60,000.00 47,146.40 Signed 2021-07-15 2021-10-21 2021-10-02 2021-12-30 2021-10-23 2022-01-31 2021-11-27 2022-03-16 2021-12-27 ant Selection ation finale du projet 149 / Recrutement d'un spéc ialiste en sauvegarde environ Individual Consult IDA / 60310 Project management Post Open 30,000.00 0.00 Canceled 2021-07-30 2021-08-26 2021-09-17 2021-10-08 2021-11-12 2022-05-11 nementale pour l'unité de co ant Selection ordination du projet TG-PCU-MP-315476-CS-CDS / Recrutement d'un consultan t pour la réalisation d'une étu IDA / 60310 Improving trade facilitation Post Direct Selection Direct - National 23,000.00 0.00 Signed 2022-09-23 2022-11-09 2022-10-03 2023-02-03 2022-12-07 2023-02-05 de d'évaluation des mesures de la catégorie B pour un pro bable report des dates définit ives TG-PCU-MP-316591-CS-INDV Strengthening the road tran / Recrutement d'un consultan Individual Consult IDA / 60310 sport and logistics services s Post Open - National 90,000.00 0.00 Canceled 2022-09-30 2022-11-18 2022-12-09 2023-01-13 2023-04-13 t pour l'assistance au MTRAF ant Selection ector pour la rédaction des textes r églementaires TG-PCU-MP-325070-CS-CDS / RECRUTEMENT D’UN CONS ULTANT POUR APPUYER LE M Strengthening the road tran INISTÈRE DES TRANSPORTS Direct - Internation IDA / 60310 sport and logistics services s Post Direct Selection 72,000.00 0.00 Canceled 2022-11-10 2022-11-20 2023-01-24 2023-05-24 ROUTIERS, AÉRIENS ET FERR al ector OVIAIRES DANS L’ELABORATI ON DES TEXTES RÉGLÉMENT AIRES DU SOUS-SECTEUR DE S TRANSPORTS ROUTIERS TG-PCU-MP-353742-CS-CDS / Mission de digitalisation des procédures de gestion des do ssiers de la CATO et la conce Under Implement ption de modules d’interopér IDA / 60310 Improving trade facilitation Post Direct Selection Direct - National 50,000.00 0.00 2023-03-29 2023-04-06 2023-04-08 2023-04-06 2023-05-09 2023-06-23 ation abilité entre la plateforme du RCCM et les plateformes du t ribunal de commerce de Lom é, de l’OTR et du ministère e n charge de l’agriculture TG-PCU-MP-353210-CS-CDS / ELABORATION DE LA POLITI Individual Consult Direct - Internation IDA / 60310 Improving trade facilitation Post 60,000.00 0.00 Canceled 2023-04-17 2023-04-27 2023-05-11 2023-06-04 2023-07-19 QUE NATIONALE DE PROMOT ant Selection al ION D'INVESTISSEMENT AU T OGO TG-PCU-MP-353221-CS-CDS Individual Consult Direct - Internation / STRATEGIE NATIONALE DE IDA / 60310 Improving trade facilitation Post 60,000.00 0.00 Canceled 2023-04-17 2023-04-27 2023-05-18 2023-06-11 2023-07-26 ant Selection al PROMOTION D'INVESTISSEME NT 145 / Evaluation de la mise Individual Consult en œuvre des mesures de fa IDA / 60310 Improving trade facilitation Post Open 50,000.00 0.00 Canceled 2021-06-30 2021-08-27 2021-09-26 2021-10-31 2021-12-30 ant Selection cilitation des échanges class ées en catégorie A TG-PCU-MP-361218-CS-CDS / ELABORATION DE LA POLITI Direct - Internation Pending Impleme QUE ET DE LA STRATEGIE NA IDA / 60310 Improving trade facilitation Post Direct Selection 124,032.00 0.00 2023-05-11 2023-05-15 2023-05-30 2023-06-29 al ntation TIONALE DE PROMOTION DE S INVESTISSEMENTS PRIVES AU TOGO Page 7 PLAN DE PASSATION DE MARCHÉS (Partie Textuelle) Information sur le Projet : [Nom du pays] [Nom du Projet] [No d’identification du projet] Agence d’exécution du Projet : [Insérer le nom officiel de l’Agence] Date du plan de passation des marchés : [Insérer la date] Période couverte par ce plan de passation des marchés : [Insérer date de début, date de fin] Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, au cas où la procédure de passation des marché est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics [Insérer la référence exacte de la législation nationale], ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : Indiquer la liste des conditions qui s’applique de manière à assurer la cohérence avec le paragraphe 5.4 du Règlement de passation des marchés. Si aucune condition s’applique, supprimer la mention « et aux conditions suivantes ». Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés. Sinon indiquer « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés. Sinon indiquer « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Travaux [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique. [Inclure cette mention seulement si la Banque a formellement acceptée de fournir cette assistance directe à l’Emprunteur. Sinon, supprimer cette phrase.] Autres informations pertinentes sur la passation des marchés Indiquer toutes autres informations pertinentes telles que la participation des communautés au développement (CDD), un besoin urgent d’assistance ou se heurte à des problèmes de capacités, etc. PROCUREMENT Guinea : GUINEA COVID-19 PREPAREDNESS AND RESPONSE PROJECT PLAN General Information Country: Guinea 2020-09-28 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174032 GPN Date: Project Name: GUINEA COVID-19 PREPAREDNESS AND RESPONSE PROJECT Loan / Credit No: IDA / D6870, IDA / 67350, IDA / D8940, IDA / 69700, IDA / 71910 PROJET DE PREPARATION ET DE REPONSE A LA COVID-19 Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GN-PPR COVID-19-187623-G O-DIR / Acquisition des Équip ements de protection Individ uelle pour les Centres de trai Emergency COVID-19 Respo tement Épidémiologiques de IDA / D6870 Post Direct Selection Direct 960,000.00 943,126.80 Completed 2020-10-29 2020-09-28 2020-11-03 2020-09-29 2020-12-08 2020-11-20 2021-03-08 2021-02-24 nse s structures de la Santé de Ki ndia, Kankan, Faranah et Lab é pour la lutte contre la pand émie de coronavirus en Guin ée avec AFRICA HEALTH CAR A GN-PPR COVID-19-187628-G O-DIR / Acquisition des Équip ements de protection Individ uelle pour les Centres de trai Emergency COVID-19 Respo tement Épidémiologiques de IDA / D6870 Post Direct Selection Direct 770,900.00 757,445.94 Completed 2020-10-30 2020-10-15 2020-11-04 2020-10-19 2020-12-09 2020-11-19 2021-03-09 2021-03-10 nse s structures de la Santé de Ki ndia, Kankan, Faranah et Lab é pour la lutte contre la pand émie de coronavirus en Guin ée avec SOGUIPREM GN-PPR COVID-19-195511-G O-DIR / Contrat avec TOMATE Project Implementation Man l’installation et le paramétra IDA / D6870 agement and Monitoring and Post Direct Selection Direct 15,000.00 11,628.82 Signed 2020-10-28 2020-09-04 2020-11-02 2020-09-07 2020-12-07 2020-11-16 2021-01-06 ge du logiciel de gestion TOM Evaluation 2PRO du Projet COVID 19 GN-PPR COVID-19-195743-G O-UN / Acquisition de 35 véhi cules Pick-up double cabines pour les structures des distri Emergency COVID-19 Respo UN Agencies (Dire IDA / D6870 Post 850,000.00 1,357,030.00 Signed 2020-11-25 2020-11-02 2020-12-05 2020-11-05 2021-01-04 2020-12-15 2021-03-05 cts sanitaires de tous les régi nse ct) ons en vue de la prise en cha rge des malades dont la Pan démie au COVID 19. Accord a vec UNOPS GN-PPR COVID-19-194043-G O-DIR / Acquisition des Soluti ons hydroalcooliques 750 ml, 500 ml, 250 ml et 120 ml po Emergency COVID-19 Respo ur les Centres de traitement IDA / D6870 Post Direct Selection Direct 500,000.00 468,806.92 Completed 2020-11-09 2020-10-27 2020-11-14 2020-10-28 2020-12-19 2020-12-12 2021-03-19 2021-03-11 nse Épidémiologiques des structu res de la Santé de Kindia, Ka nkan, Faranah et Labé pour l a lutte contre la pandémie de coronavirus en Guinée avec l a PCG GN-PPR COVID-19-204339-G O-RFQ / Acquisition des équi pements informatiques (serv Project Implementation Man eur de base de donnée pour Request for Quota Single Stage - One E IDA / 67350 agement and Monitoring and Post Limited 30,000.00 30,367.50 Completed 2021-01-03 2021-03-17 2021-02-28 2021-05-28 2021-03-30 2021-08-19 l'appui au fonctionnement du tions nvelope Evaluation Centre d'appel 115 de l'Agen ce Nationale de Sécurité Sani taire (ANSS) en période de ri poste au COVID-19 GN-PPR COVID-19-207917-G O-UN / Dotation de 300 000 t Emergency COVID-19 Respo UN Agencies (Dire ests antigéniques de diagnos IDA / 67350 Prior Direct 2,180,850.00 2,180,850.00 Completed 2021-02-08 2020-12-09 2021-02-13 2020-12-19 2021-03-20 2021-02-05 2021-06-18 2021-03-09 nse ct) tic rapides pour la prise en c harge du COVID 19 avec l'UN ICEF GN-PPR COVID-19-211866-G O-DIR / Fourniture et installat ion d'une logiciel de gestion des données de vaccination, Project Implementation Man une application de sensibilisa IDA / 67350 agement and Monitoring and Post Direct Selection Direct 82,000.00 77,699.28 Completed 2021-01-20 2021-01-11 2021-01-25 2021-01-11 2021-03-01 2021-01-26 2021-04-30 2021-02-12 tion communautaire, d'une a Evaluation pplication de technologie US SD et d'une application de su rveillance pour le suivi des co ntacts avec BANKI TECHNOL OGY. GN-PPR COVID-19-217116-G O-DIR / Acquisition des Équip ements de protection Individ uelle pour les Centres de trai Emergency COVID-19 Respo tement Épidémiologiques de IDA / 67350 Post Direct Selection Direct 1,451,000.00 1,482,729.02 Completed 2021-03-25 2021-03-03 2021-03-30 2021-03-10 2021-05-18 2021-04-23 2021-08-06 2021-06-08 nse s structures de la Santé de Ki ndia, Kankan, Faranah et Lab é pour la lutte contre la pand émie de coronavirus en Guin ée avec SOGUIPREM GN-PPR COVID-19-246913-G O-DIR / Acquisition de 1 300 000 doses de vaccins Shinop Emergency COVID-19 Respo harm et 1 497 600 seringues IDA / D8940 Prior Direct Selection Direct 9,219,808.00 9,770,040.81 Signed 2021-08-20 2022-02-17 2021-08-25 2022-02-24 2021-09-29 2021-08-13 2021-10-29 nse pour faire face à la 3ème de l a COVIS en Guinée en entent e Direct avec Beijing Institute of Biological Product Co, Ltd Page 1 GN-PPR COVID-19-249517-G O-DIR / Acquisition de 1 046 Emergency COVID-19 Respo 667 doses de vaccins et 1 15 IDA / D8940 Prior Direct Selection Direct 9,644,491.91 0.00 Canceled 2021-09-17 2021-09-22 2021-10-27 2022-04-25 nse 1 300 seringues et autres int rants pour la lutte contre la C OVID-19 avec UNICEF GN-PPR COVID-19-249747-G O-RFQ / Acquisition et install ation de huit groupes électro Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 69700 Post Limited 48,000.00 0.00 Canceled 2021-10-25 2021-12-20 2022-06-18 gènes de 14 KVA - Pour les ré nse tions nvelope gions de Conakry, Kindia, Bo ké, Mamou, Labé, Faranah, K ankan et N'Zérékoré GN-PPR COVID-19-194045-G O-DIR / Acquisition des Équip ements de protection Individ uelle pour les Centres de trai Emergency COVID-19 Respo tement Épidémiologiques de IDA / D6870 Post Direct Selection Direct 680,000.00 0.00 Canceled 2020-11-05 2020-11-10 2020-12-15 2021-03-15 nse s structures de la Santé de Ki ndia, Kankan, Faranah et Lab é pour la lutte contre la pand émie de coronavirus en Guin ée avec la Société PROCURE NET GN-PPR COVID-19-292387-G O-DIR / Acquisition par enten te directe avec UNICEF de di Emergency COVID-19 Respo IDA / 69700 Post Direct Selection Direct 1,600,000.00 0.00 Canceled 2022-05-23 2022-05-24 2022-05-28 2022-03-15 2022-07-16 2023-07-11 vers équipements et fournitu nse res en vue de la prise en cha rge de la maladie de COVID- 19 GN-PPR COVID-19-292398-G O-DIR / Fournir des médicam ents pour la gestion des MAPI Emergency COVID-19 Respo mineurs dans les 38 districts IDA / 69700 Post Direct Selection Direct 260,000.00 0.00 Signed 2022-05-30 2022-05-24 2022-06-04 2022-03-15 2022-07-09 2023-01-05 nse sanitaires et la prise en char ge de 300 cas de MAPI grave s attendus (convention avec OMS) GN-PPR COVID-19-292400-G O-DIR / Acheter et installer 2 incinérateurs de grande capa cités et accessoires (broyeur Emergency COVID-19 Respo IDA / 69700 Post Direct Selection Direct 230,000.00 0.00 Signed 2022-05-31 2022-05-24 2022-06-05 2022-03-10 2022-07-24 2023-01-20 s de verres, poubelles) abri p nse our l’incinérateur avec maga sin de stockage, fosses et clô ture en grillage pour Gaoual et Boffa (convention avec OM S) GN-PPR COVID-19-292405-G O-DIR / Transport et Installati on de 4 centrales de producti on d’Oxygène dans les CTEPI Emergency COVID-19 Respo IDA / 69700 Post Direct Selection Direct 450,000.00 0.00 Signed 2022-06-15 2022-05-24 2022-06-20 2022-04-15 2022-08-08 2023-02-04 de Conakry (Nongo), Kankan, nse Labé et N’Zérékoré et achat de quatre (4) groupes électro gènes de 50 KVA (Conventio n avec l'OMS) GN-PPR COVID-19-292412-G O-RFQ / Acquisition de 150 ta blettes pour les gestionnaires Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 69700 Post Limited 85,000.00 47,672.63 Completed 2022-06-01 2022-06-06 2022-07-27 2022-08-20 2022-09-10 2022-09-15 de données des équipes de v nse tions nvelope accination pour la remonté d es informations à l'ANSS. GN-PPR COVID-19-297598-G O-DIR / Acquisition par enten te directe avec UNICEF de di Emergency COVID-19 Respo Under Imple IDA / 69700 Prior Direct Selection Direct 1,600,000.00 0.00 2022-06-29 2022-06-08 2022-07-04 2022-06-16 2022-08-22 2023-08-17 vers équipements et fournitu nse mentation res en vue de la prise en cha rge de la maladie de COVID- 19 GN-PPR COVID-19-297749-G O-DIR / Achat d'équipements et payement des frais de con nexion Internet haut débit 12 Project Implementation Man Pending Impl Mbs pour l'ANSS et les 8 régi IDA / 69700 agement and Monitoring and Post Direct Selection Direct 287,761.00 0.00 2022-06-23 2022-06-28 2022-08-02 2022-10-01 ementation ons (Labé, Kankan, N'Zérékor Evaluation é, Faranah; Boké, Mamou, Co nakry et Kindia) - Entente dir ecte avec MIRS (Maintenance Informatique Réseau Systèm e) GN-PPR COVID-19-349134-G O-DIR / Convention avec UNI CEF pour l'acquisition et inst Emergency COVID-19 Respo Pending Impl allation de divers équipemen IDA / 69700 Prior Direct Selection Direct - National 3,089,000.00 0.00 2023-07-24 2023-08-08 2023-09-28 2024-09-22 nse ementation ts (Chambres froides, Camio ns frigorifiques, Groupes élec trogènes, Glacières et Portes Vaccins). GN-PPR COVID-19-349163-G O-RFB / Acquisition et installa Emergency COVID-19 Respo Open - Internationa Single Stage - One E Pending Impl tion des équipements et intra IDA / 71910 Prior Request for Bids 2,000,000.00 0.00 2023-07-17 2023-07-22 2023-09-02 2023-10-02 2023-11-21 2024-05-19 nse l nvelope ementation nts de laboratoires (INSP, LC VD, Fièvre hémorragique) et formation des utilisateurs GN-PPR COVID-19-349172-G O-RFQ / Acquisition du matéri el informatique (ordinateurs Project Implementation Man Request for Quota Single Stage - One E Pending Impl f imprimantes, stabilisateurs, IDA / 71910 agement and Monitoring and Post Limited 98,500.00 0.00 2023-07-09 2023-09-17 2023-11-01 tions nvelope ementation onduleurs, rallonges et focus Evaluation ) pour la DNHP, les sites RAM SAR de l'Environnement et 8 Inspection Régionale de l'Ele vage GN-PPR COVID-19-349177-G O-RFB / Acquisition de divers équipements de soins d'urge Emergency COVID-19 Respo Open - Internationa Single Stage - One E Pending Impl IDA / 71910 Prior Request for Bids 4,000,000.00 0.00 2023-07-17 2023-08-01 2023-09-12 2023-10-12 2023-12-06 2024-06-03 nces et soins intensifs pour l nse l nvelope ementation es hôpitaux de Mamou, Fara nah, Boké, Matoto, Kindia, Ka nkan, Labé, N'Zérékoré et Si guiri GN-PPR COVID-19-204350-G O-RFB / Acquisition et installa tion des incinérateurs (équip Emergency COVID-19 Respo Single Stage - One E IDA / 67350 Post Request for Bids Open - National 450,000.00 0.00 Canceled 2021-02-25 2021-02-08 2021-03-02 2021-02-15 2021-04-13 2021-03-31 2021-05-13 2021-08-12 2021-06-17 2021-12-14 ements de gestion des déche nse nvelope ts biomédicaux) ainsi que la f ormation des utilisateurs, en faveur de 8 districts sanitaire s NON CONSULTING SERVICES Page 2 Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GN-PPR COVID-19-292411-N C-RFP / Prestataire de Servic Emergency COVID-19 Respo Request for Quota Single Stage - One E e pour la production de 1 00 IDA / 69700 Post Limited 98,500.00 0.00 Completed 2022-05-28 2022-06-27 2022-07-23 2022-09-06 2022-10-07 nse tions nvelope 0 000 cartes de vaccination p our l'Agence Nationale de Sé curité Sanitaire (ANSS) GN-PPR COVID-19-249504-N Project Implementation Man C-RFQ / Prestataire de Servic Request for Quota Single Stage - One E IDA / 69700 agement and Monitoring and Post Limited 10,000.00 0.00 Completed 2022-07-25 2022-09-21 2022-09-19 2022-11-18 2023-02-26 e pour la confection des Age tions nvelope Evaluation ndas et Calendriers 2023 per sonnalisé COVID-19. GN-PPR COVID-19-349168-G O-RFQ / Prestataire de Servic Emergency COVID-19 Respo Request for Quota Single Stage - One E Pending Impl IDA / 71910 Post Limited 98,500.00 0.00 2023-06-27 2023-08-22 2023-10-21 e pour la production de 1 00 nse tions nvelope ementation 0 000 de cartes de vaccinatio n en faveur de l'ANSS CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GN-PPR COVID-19-197533-C S-UN / Appui à la mise en œu Project Implementation Man vre du Plan Annuel de Comm UN Agencies (Dire IDA / 67350 agement and Monitoring and Prior Direct 2,484,972.00 1,406,840.00 Signed 2021-03-02 2021-02-20 2022-03-02 unication, de Mobilisation So ct) Evaluation ciale et d’Engagement Com munautaire en Guinée avec l' UNICEF GN-PPR COVID-19-207947-C S-QCBS / Recrutement du Ca Project Implementation Man Quality And Cost- Open - Internationa binet d'audit pour l'audit ext IDA / 67350 agement and Monitoring and Post 45,000.00 0.00 Signed 2021-05-27 2021-02-25 2021-06-17 2021-04-27 2021-08-16 2022-01-24 2021-09-30 2022-03-02 2021-10-30 2022-03-15 2021-12-29 2022-03-22 2022-02-11 2023-06-30 Based Selection l erne des comptes du Projet d Evaluation e Préparation et de Réponse au COVID-19 GN-PPR COVID-19-195030-C S-UN / Convention avec OIM pour une Assistance Techniq Emergency COVID-19 Respo UN Agencies (Dire ue à la préparation des fronti IDA / D6870 Prior Direct 1,000,000.00 0.00 Canceled 2020-12-19 2021-06-17 nse ct) ères terrestres en attendant l eurs ouvertures dans le cadr e de l'urgence sanitaire de la pandémie COVID 19 GN-PPR COVID-19-349204-C S-INDV / Recrutement d'un C abinet pour mener une enqu Emergency COVID-19 Respo Consultant Qualifi ête d'évaluation des effets et IDA / 69700 Post Open - National 60,000.00 0.00 Under Review 2023-09-20 2023-06-26 2023-10-11 2023-11-24 2023-12-24 2024-01-28 2024-07-26 nse cation Selection impacts de la communication , mobilisation sociale et enga gement communautaire sur l a riposte contre le Covid-19 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GN-PPR COVID-19-217594-C S-CDS / Recrutement d'un Co Project Implementation Man nsultant National pour appuy IDA / 67350 agement and Monitoring and Post Direct Selection Direct 30,000.00 8,992.49 Completed 2021-05-26 2021-04-02 2021-06-05 2021-04-29 2021-08-09 2021-06-16 2021-09-08 2021-12-21 er à la rédaction du cadre de Evaluation préparation à l'évaluation de s besoins en vaccin COVID-1 9 (COVAX) en Guinée. GN-PPR COVID-19-292415-C S-CDS / Appui à la mise en œ uvre du plan annuel de com Emergency COVID-19 Respo Under Implement IDA / 69700 Prior Direct Selection Direct 1,701,234.00 0.00 2022-06-30 2022-07-21 2022-07-10 2022-09-24 2022-09-22 2022-12-31 munication, de mobilisation s nse ation ociale et d'engagement com munautaire de la vaccination (convention avec l'UNICEF) GN-PPR COVID-19-292423-C S-INDV / Recrutement d'un c Project Implementation Man onsultant national pour l'élab Individual Consult Under Implement IDA / 69700 agement and Monitoring and Post Open 22,000.00 0.00 2022-06-20 2022-05-24 2022-08-08 2022-08-29 2022-10-03 2022-11-02 oration des Plans internes de ant Selection ation Evaluation gestion des déchets des stru ctures appuyées par le Projet pour 30 jours GN-PPR COVID-19-296767-C S-INDV / Termes de référenc Project Implementation Man e de recrutement d’un (e) Co Individual Consult IDA / 69700 agement and Monitoring and Post Open 60,000.00 0.00 Signed 2022-07-28 2022-05-31 2022-09-15 2022-11-24 2022-10-06 2022-12-02 2022-11-10 2023-05-09 nsultante Expert (e) en Viole ant Selection Evaluation nces Basées sur le Genre, Ex ploitation, Abus Sexuel et Ha rcèlement (VBG/EAS/HS) GN-PPR COVID-19-349182-C S-CDS / Contrat avec AFENET pour former 2 cohortes FETP Emergency COVID-19 Respo Direct - Internation Under Implement front line (34 participants par IDA / 69700 Post Direct Selection 610,000.00 0.00 2023-09-12 2023-10-02 2023-12-17 2024-12-11 nse al ation cohorte) et 1 cohorte cohort e FETP intermédiaire (20 part icipants) en épidémiologie de terrain Page 3 PLAN DE PASSATION DE MARCHÉS (Partie Textuelle) Information sur le Projet : [Nom du pays] [Nom du Projet] [No d’identification du projet] Agence d’exécution du Projet : [Insérer le nom officiel de l’Agence] Date du plan de passation des marchés : [Insérer la date] Période couverte par ce plan de passation des marchés : [Insérer date de début, date de fin] Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, au cas où la procédure de passation des marché est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics [Insérer la référence exacte de la législation nationale], ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : Indiquer la liste des conditions qui s’applique de manière à assurer la cohérence avec le paragraphe 5.4 du Règlement de passation des marchés. Si aucune condition s’applique, supprimer la mention « et aux conditions suivantes ». Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés. Sinon indiquer « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés. Sinon indiquer « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Travaux [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique. [Inclure cette mention seulement si la Banque a formellement acceptée de fournir cette assistance directe à l’Emprunteur. Sinon, supprimer cette phrase.] Autres informations pertinentes sur la passation des marchés Indiquer toutes autres informations pertinentes telles que la participation des communautés au développement (CDD), un besoin urgent d’assistance ou se heurte à des problèmes de capacités, etc. PROCUREMENT Guinea : GUINEA COVID-19 PREPAREDNESS AND RESPONSE PROJECT PLAN General Information Country: Guinea 2020-09-28 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174032 GPN Date: Project Name: GUINEA COVID-19 PREPAREDNESS AND RESPONSE PROJECT Loan / Credit No: IDA / D6870, IDA / 67350, IDA / D8940, IDA / 69700, IDA / 71910 PROJET DE PREPARATION ET DE REPONSE A LA COVID-19 Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GN-PPR COVID-19-187623-G O-DIR / Acquisition des Équip ements de protection Individ uelle pour les Centres de trai Emergency COVID-19 Respo tement Épidémiologiques de IDA / D6870 Post Direct Selection Direct 960,000.00 943,126.80 Completed 2020-10-29 2020-09-28 2020-11-03 2020-09-29 2020-12-08 2020-11-20 2021-03-08 2021-02-24 nse s structures de la Santé de Ki ndia, Kankan, Faranah et Lab é pour la lutte contre la pand émie de coronavirus en Guin ée avec AFRICA HEALTH CAR A GN-PPR COVID-19-187628-G O-DIR / Acquisition des Équip ements de protection Individ uelle pour les Centres de trai Emergency COVID-19 Respo tement Épidémiologiques de IDA / D6870 Post Direct Selection Direct 770,900.00 757,445.94 Completed 2020-10-30 2020-10-15 2020-11-04 2020-10-19 2020-12-09 2020-11-19 2021-03-09 2021-03-10 nse s structures de la Santé de Ki ndia, Kankan, Faranah et Lab é pour la lutte contre la pand émie de coronavirus en Guin ée avec SOGUIPREM GN-PPR COVID-19-195511-G O-DIR / Contrat avec TOMATE Project Implementation Man l’installation et le paramétra IDA / D6870 agement and Monitoring and Post Direct Selection Direct 15,000.00 11,628.82 Signed 2020-10-28 2020-09-04 2020-11-02 2020-09-07 2020-12-07 2020-11-16 2021-01-06 ge du logiciel de gestion TOM Evaluation 2PRO du Projet COVID 19 GN-PPR COVID-19-195743-G O-UN / Acquisition de 35 véhi cules Pick-up double cabines pour les structures des distri Emergency COVID-19 Respo UN Agencies (Dire IDA / D6870 Post 850,000.00 1,357,030.00 Signed 2020-11-25 2020-11-02 2020-12-05 2020-11-05 2021-01-04 2020-12-15 2021-03-05 cts sanitaires de tous les régi nse ct) ons en vue de la prise en cha rge des malades dont la Pan démie au COVID 19. Accord a vec UNOPS GN-PPR COVID-19-194043-G O-DIR / Acquisition des Soluti ons hydroalcooliques 750 ml, 500 ml, 250 ml et 120 ml po Emergency COVID-19 Respo ur les Centres de traitement IDA / D6870 Post Direct Selection Direct 500,000.00 468,806.92 Completed 2020-11-09 2020-10-27 2020-11-14 2020-10-28 2020-12-19 2020-12-12 2021-03-19 2021-03-11 nse Épidémiologiques des structu res de la Santé de Kindia, Ka nkan, Faranah et Labé pour l a lutte contre la pandémie de coronavirus en Guinée avec l a PCG GN-PPR COVID-19-204339-G O-RFQ / Acquisition des équi pements informatiques (serv Project Implementation Man eur de base de donnée pour Request for Quota Single Stage - One E IDA / 67350 agement and Monitoring and Post Limited 30,000.00 30,367.50 Completed 2021-01-03 2021-03-17 2021-02-28 2021-05-28 2021-03-30 2021-08-19 l'appui au fonctionnement du tions nvelope Evaluation Centre d'appel 115 de l'Agen ce Nationale de Sécurité Sani taire (ANSS) en période de ri poste au COVID-19 GN-PPR COVID-19-207917-G O-UN / Dotation de 300 000 t Emergency COVID-19 Respo UN Agencies (Dire ests antigéniques de diagnos IDA / 67350 Prior Direct 2,180,850.00 2,180,850.00 Completed 2021-02-08 2020-12-09 2021-02-13 2020-12-19 2021-03-20 2021-02-05 2021-06-18 2021-03-09 nse ct) tic rapides pour la prise en c harge du COVID 19 avec l'UN ICEF GN-PPR COVID-19-211866-G O-DIR / Fourniture et installat ion d'une logiciel de gestion des données de vaccination, Project Implementation Man une application de sensibilisa IDA / 67350 agement and Monitoring and Post Direct Selection Direct 82,000.00 77,699.28 Completed 2021-01-20 2021-01-11 2021-01-25 2021-01-11 2021-03-01 2021-01-26 2021-04-30 2021-02-12 tion communautaire, d'une a Evaluation pplication de technologie US SD et d'une application de su rveillance pour le suivi des co ntacts avec BANKI TECHNOL OGY. GN-PPR COVID-19-217116-G O-DIR / Acquisition des Équip ements de protection Individ uelle pour les Centres de trai Emergency COVID-19 Respo tement Épidémiologiques de IDA / 67350 Post Direct Selection Direct 1,451,000.00 1,482,729.02 Completed 2021-03-25 2021-03-03 2021-03-30 2021-03-10 2021-05-18 2021-04-23 2021-08-06 2021-06-08 nse s structures de la Santé de Ki ndia, Kankan, Faranah et Lab é pour la lutte contre la pand émie de coronavirus en Guin ée avec SOGUIPREM GN-PPR COVID-19-246913-G O-DIR / Acquisition de 1 300 000 doses de vaccins Shinop Emergency COVID-19 Respo harm et 1 497 600 seringues IDA / D8940 Prior Direct Selection Direct 9,219,808.00 9,770,040.81 Signed 2021-08-20 2022-02-17 2021-08-25 2022-02-24 2021-09-29 2021-08-13 2021-10-29 nse pour faire face à la 3ème de l a COVIS en Guinée en entent e Direct avec Beijing Institute of Biological Product Co, Ltd Page 1 GN-PPR COVID-19-249517-G O-DIR / Acquisition de 1 046 Emergency COVID-19 Respo 667 doses de vaccins et 1 15 IDA / D8940 Prior Direct Selection Direct 9,644,491.91 0.00 Canceled 2021-09-17 2021-09-22 2021-10-27 2022-04-25 nse 1 300 seringues et autres int rants pour la lutte contre la C OVID-19 avec UNICEF GN-PPR COVID-19-249747-G O-RFQ / Acquisition et install ation de huit groupes électro Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 69700 Post Limited 48,000.00 0.00 Canceled 2021-10-25 2021-12-20 2022-06-18 gènes de 14 KVA - Pour les ré nse tions nvelope gions de Conakry, Kindia, Bo ké, Mamou, Labé, Faranah, K ankan et N'Zérékoré GN-PPR COVID-19-194045-G O-DIR / Acquisition des Équip ements de protection Individ uelle pour les Centres de trai Emergency COVID-19 Respo tement Épidémiologiques de IDA / D6870 Post Direct Selection Direct 680,000.00 0.00 Canceled 2020-11-05 2020-11-10 2020-12-15 2021-03-15 nse s structures de la Santé de Ki ndia, Kankan, Faranah et Lab é pour la lutte contre la pand émie de coronavirus en Guin ée avec la Société PROCURE NET GN-PPR COVID-19-292387-G O-DIR / Acquisition par enten te directe avec UNICEF de di Emergency COVID-19 Respo IDA / 69700 Post Direct Selection Direct 1,600,000.00 0.00 Canceled 2022-05-23 2022-05-24 2022-05-28 2022-03-15 2022-07-16 2023-07-11 vers équipements et fournitu nse res en vue de la prise en cha rge de la maladie de COVID- 19 GN-PPR COVID-19-292398-G O-DIR / Fournir des médicam ents pour la gestion des MAPI Emergency COVID-19 Respo mineurs dans les 38 districts IDA / 69700 Post Direct Selection Direct 260,000.00 0.00 Signed 2022-05-30 2022-05-24 2022-06-04 2022-03-15 2022-07-09 2023-01-05 nse sanitaires et la prise en char ge de 300 cas de MAPI grave s attendus (convention avec OMS) GN-PPR COVID-19-292400-G O-DIR / Acheter et installer 2 incinérateurs de grande capa cités et accessoires (broyeur Emergency COVID-19 Respo IDA / 69700 Post Direct Selection Direct 230,000.00 0.00 Signed 2022-05-31 2022-05-24 2022-06-05 2022-03-10 2022-07-24 2023-01-20 s de verres, poubelles) abri p nse our l’incinérateur avec maga sin de stockage, fosses et clô ture en grillage pour Gaoual et Boffa (convention avec OM S) GN-PPR COVID-19-292405-G O-DIR / Transport et Installati on de 4 centrales de producti on d’Oxygène dans les CTEPI Emergency COVID-19 Respo IDA / 69700 Post Direct Selection Direct 450,000.00 0.00 Signed 2022-06-15 2022-05-24 2022-06-20 2022-04-15 2022-08-08 2023-02-04 de Conakry (Nongo), Kankan, nse Labé et N’Zérékoré et achat de quatre (4) groupes électro gènes de 50 KVA (Conventio n avec l'OMS) GN-PPR COVID-19-292412-G O-RFQ / Acquisition de 150 ta blettes pour les gestionnaires Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 69700 Post Limited 85,000.00 47,672.63 Completed 2022-06-01 2022-06-06 2022-07-27 2022-08-20 2022-09-10 2022-09-15 de données des équipes de v nse tions nvelope accination pour la remonté d es informations à l'ANSS. GN-PPR COVID-19-297598-G O-DIR / Acquisition par enten te directe avec UNICEF de di Emergency COVID-19 Respo Under Imple IDA / 69700 Prior Direct Selection Direct 1,600,000.00 0.00 2022-06-29 2022-06-08 2022-07-04 2022-06-16 2022-08-22 2023-08-17 vers équipements et fournitu nse mentation res en vue de la prise en cha rge de la maladie de COVID- 19 GN-PPR COVID-19-297749-G O-DIR / Achat d'équipements et payement des frais de con nexion Internet haut débit 12 Project Implementation Man Pending Impl Mbs pour l'ANSS et les 8 régi IDA / 69700 agement and Monitoring and Post Direct Selection Direct 287,761.00 0.00 2022-06-23 2022-06-28 2022-08-02 2022-10-01 ementation ons (Labé, Kankan, N'Zérékor Evaluation é, Faranah; Boké, Mamou, Co nakry et Kindia) - Entente dir ecte avec MIRS (Maintenance Informatique Réseau Systèm e) GN-PPR COVID-19-349134-G O-DIR / Convention avec UNI CEF pour l'acquisition et inst Emergency COVID-19 Respo Pending Impl allation de divers équipemen IDA / 69700 Prior Direct Selection Direct - National 3,089,000.00 0.00 2023-07-24 2023-08-08 2023-09-28 2024-09-22 nse ementation ts (Chambres froides, Camio ns frigorifiques, Groupes élec trogènes, Glacières et Portes Vaccins). GN-PPR COVID-19-349163-G O-RFB / Acquisition et installa Emergency COVID-19 Respo Open - Internationa Single Stage - One E Pending Impl tion des équipements et intra IDA / 71910 Prior Request for Bids 2,000,000.00 0.00 2023-07-17 2023-07-22 2023-09-02 2023-10-02 2023-11-21 2024-05-19 nse l nvelope ementation nts de laboratoires (INSP, LC VD, Fièvre hémorragique) et formation des utilisateurs GN-PPR COVID-19-349172-G O-RFQ / Acquisition du matéri el informatique (ordinateurs Project Implementation Man Request for Quota Single Stage - One E Pending Impl f imprimantes, stabilisateurs, IDA / 71910 agement and Monitoring and Post Limited 98,500.00 0.00 2023-07-09 2023-09-17 2023-11-01 tions nvelope ementation onduleurs, rallonges et focus Evaluation ) pour la DNHP, les sites RAM SAR de l'Environnement et 8 Inspection Régionale de l'Ele vage GN-PPR COVID-19-349177-G O-RFB / Acquisition de divers équipements de soins d'urge Emergency COVID-19 Respo Open - Internationa Single Stage - One E Pending Impl IDA / 71910 Prior Request for Bids 4,000,000.00 0.00 2023-07-17 2023-08-01 2023-09-12 2023-10-12 2023-12-06 2024-06-03 nces et soins intensifs pour l nse l nvelope ementation es hôpitaux de Mamou, Fara nah, Boké, Matoto, Kindia, Ka nkan, Labé, N'Zérékoré et Si guiri GN-PPR COVID-19-204350-G O-RFB / Acquisition et installa tion des incinérateurs (équip Emergency COVID-19 Respo Single Stage - One E IDA / 67350 Post Request for Bids Open - National 450,000.00 0.00 Canceled 2021-02-25 2021-02-08 2021-03-02 2021-02-15 2021-04-13 2021-03-31 2021-05-13 2021-08-12 2021-06-17 2021-12-14 ements de gestion des déche nse nvelope ts biomédicaux) ainsi que la f ormation des utilisateurs, en faveur de 8 districts sanitaire s NON CONSULTING SERVICES Page 2 Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GN-PPR COVID-19-292411-N C-RFP / Prestataire de Servic Emergency COVID-19 Respo Request for Quota Single Stage - One E e pour la production de 1 00 IDA / 69700 Post Limited 98,500.00 0.00 Completed 2022-05-28 2022-06-27 2022-07-23 2022-09-06 2022-10-07 nse tions nvelope 0 000 cartes de vaccination p our l'Agence Nationale de Sé curité Sanitaire (ANSS) GN-PPR COVID-19-249504-N Project Implementation Man C-RFQ / Prestataire de Servic Request for Quota Single Stage - One E IDA / 69700 agement and Monitoring and Post Limited 10,000.00 0.00 Completed 2022-07-25 2022-09-21 2022-09-19 2022-11-18 2023-02-26 e pour la confection des Age tions nvelope Evaluation ndas et Calendriers 2023 per sonnalisé COVID-19. GN-PPR COVID-19-349168-G O-RFQ / Prestataire de Servic Emergency COVID-19 Respo Request for Quota Single Stage - One E Pending Impl IDA / 71910 Post Limited 98,500.00 0.00 2023-06-27 2023-08-22 2023-10-21 e pour la production de 1 00 nse tions nvelope ementation 0 000 de cartes de vaccinatio n en faveur de l'ANSS CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GN-PPR COVID-19-197533-C S-UN / Appui à la mise en œu Project Implementation Man vre du Plan Annuel de Comm UN Agencies (Dire IDA / 67350 agement and Monitoring and Prior Direct 2,484,972.00 1,406,840.00 Signed 2021-03-02 2021-02-20 2022-03-02 unication, de Mobilisation So ct) Evaluation ciale et d’Engagement Com munautaire en Guinée avec l' UNICEF GN-PPR COVID-19-207947-C S-QCBS / Recrutement du Ca Project Implementation Man Quality And Cost- Open - Internationa binet d'audit pour l'audit ext IDA / 67350 agement and Monitoring and Post 45,000.00 0.00 Signed 2021-05-27 2021-02-25 2021-06-17 2021-04-27 2021-08-16 2022-01-24 2021-09-30 2022-03-02 2021-10-30 2022-03-15 2021-12-29 2022-03-22 2022-02-11 2023-06-30 Based Selection l erne des comptes du Projet d Evaluation e Préparation et de Réponse au COVID-19 GN-PPR COVID-19-195030-C S-UN / Convention avec OIM pour une Assistance Techniq Emergency COVID-19 Respo UN Agencies (Dire ue à la préparation des fronti IDA / D6870 Prior Direct 1,000,000.00 0.00 Canceled 2020-12-19 2021-06-17 nse ct) ères terrestres en attendant l eurs ouvertures dans le cadr e de l'urgence sanitaire de la pandémie COVID 19 GN-PPR COVID-19-349204-C S-INDV / Recrutement d'un C abinet pour mener une enqu Emergency COVID-19 Respo Consultant Qualifi ête d'évaluation des effets et IDA / 69700 Post Open - National 60,000.00 0.00 Under Review 2023-09-20 2023-06-26 2023-10-11 2023-11-24 2023-12-24 2024-01-28 2024-07-26 nse cation Selection impacts de la communication , mobilisation sociale et enga gement communautaire sur l a riposte contre le Covid-19 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GN-PPR COVID-19-217594-C S-CDS / Recrutement d'un Co Project Implementation Man nsultant National pour appuy IDA / 67350 agement and Monitoring and Post Direct Selection Direct 30,000.00 8,992.49 Completed 2021-05-26 2021-04-02 2021-06-05 2021-04-29 2021-08-09 2021-06-16 2021-09-08 2021-12-21 er à la rédaction du cadre de Evaluation préparation à l'évaluation de s besoins en vaccin COVID-1 9 (COVAX) en Guinée. GN-PPR COVID-19-292415-C S-CDS / Appui à la mise en œ uvre du plan annuel de com Emergency COVID-19 Respo Under Implement IDA / 69700 Prior Direct Selection Direct 1,701,234.00 0.00 2022-06-30 2022-07-21 2022-07-10 2022-09-24 2022-09-22 2022-12-31 munication, de mobilisation s nse ation ociale et d'engagement com munautaire de la vaccination (convention avec l'UNICEF) GN-PPR COVID-19-292423-C S-INDV / Recrutement d'un c Project Implementation Man onsultant national pour l'élab Individual Consult Under Implement IDA / 69700 agement and Monitoring and Post Open 22,000.00 0.00 2022-06-20 2022-05-24 2022-08-08 2022-08-29 2022-10-03 2022-11-02 oration des Plans internes de ant Selection ation Evaluation gestion des déchets des stru ctures appuyées par le Projet pour 30 jours GN-PPR COVID-19-296767-C S-INDV / Termes de référenc Project Implementation Man e de recrutement d’un (e) Co Individual Consult IDA / 69700 agement and Monitoring and Post Open 60,000.00 0.00 Signed 2022-07-28 2022-05-31 2022-09-15 2022-11-24 2022-10-06 2022-12-02 2022-11-10 2023-05-09 nsultante Expert (e) en Viole ant Selection Evaluation nces Basées sur le Genre, Ex ploitation, Abus Sexuel et Ha rcèlement (VBG/EAS/HS) GN-PPR COVID-19-349182-C S-CDS / Contrat avec AFENET pour former 2 cohortes FETP Emergency COVID-19 Respo Direct - Internation Under Implement front line (34 participants par IDA / 69700 Post Direct Selection 610,000.00 0.00 2023-09-12 2023-10-02 2023-12-17 2024-12-11 nse al ation cohorte) et 1 cohorte cohort e FETP intermédiaire (20 part icipants) en épidémiologie de terrain Page 3 18 MONTHS PROCUREMENT PLAN Project information: Liberia; Monrovia Integrated Development Project (MIDP); P169718 Project Implementation Agency: Ministry of Public Works Date of the Procurement Plan: September 2021 Period covered by this Procurement Plan: September 2021-December 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitutes the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. Other Relevant Procurement Information: (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds*, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the MIDP project): Thresholds*, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] All contracts at or above USD 10,000,000 are subject to Open Competition international advertising and C ≥ 5,000,000 International Market the use of the Bank’s SPDs (or Approach 1 Works other documents agreed with the Bank). Open Competition 200,000 < C < 5,000,000 None National Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Request for ≤ 200,000 Quotation/National None Shopping All contracts at or above USD 2,000,000 are subject to Open Competition international advertising and ≥ 500,000 International Market the use of the Bank’s SPDs (or Approach other documents agreed with the Bank). Goods, IT and 2 non-consulting Open Competition services National Market : Approach None 100,000 < C < 500,000 Request for Quotation/National C ≤ 100,000 None Shopping All contracts at or above USD 100,000 are subject to For international advertising and C < 100,000 Consulting Services the use of the Bank’s SPDs (or other documents agreed with Shortlist of the Bank) 3 National All contracts at or above USD Consultants For 200,000 are subject to Engineering and international advertising and C ≤ 200,000 Construction the use of the Bank’s SPDs (or Supervision other documents agreed with the Bank). Selection of All values ≥ 100,000 4 Individual All Approaches consultants Training, Workshops, Based on approved This line activity is not subject 5 Study Tours All Values Annual Work Plan & to procurement Review. Budgets (AWPB) by TTL (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will need for prequalification in the procurement arrangements under the PMU.) *These thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Pre-qualification: Expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: the PMU team will update the existing Procurement manuals. The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: Regional procurement collaboration under MIDP is envisaged. Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: b) PROCUREMENT PLAN Goods 1 2 3 4 5 6 7 8 9 10 Ref. Contract Estimat Procure Preq Natio Revie Expect Expecte Comments No. ed ment ualifi nal w ed bid d (Description) Method catio Prefe openin Contrac Cost n rence by g date t Start (yes/ (yes/ Bank Date US$ no) no) (Prior / Post) 1. Procurement of $15,000. RFQ, No No Post Office Equipment 00 Open, Decemb Nationa er 2021,20 January 2 months l 22 2022 delivery pd. 2. Procurement of $96,000. RFB, No No Post Decemb vehicles (purchase, 00 Open, er 2021 registration & Nationa insurance of 2 l January vehicles) 2022 3 months delivery pd 3. Procurement of $7,500.0 RFQ, No No Post Decemb Office Furniture. 0 Open, er 2021 January Nationa 2022 1 month l delivery pd Consultancy Services 1 2 3 4 5 6 7 8 Ref. Description of Estimate Revie Expected Expected No. Assignment d Selectio w date of n proposal Contract Comments Cost Method/ by submissi Start Arrange Bank on US$ Date ment (Prior / Post) 1. Consulting service for $250,000. QCS Prior Decemb March 2022 Hydro/top/bathymetric 00 review er 2021 surveys 2. Consulting service for $900,000. QCBS Prior Decemb April 2022 Works Feasibility & 00 review er 2021 Design Studies 3. Project Coordinator 132,000.0 IC Post Novemb January (24months) 0 review er 2021 2022 4. Procurement Specialist 72,000.00 IC Post Novemb January review er 2021 2022 (24months) 5. Financial Management 72,000.00 IC Post Novemb January Officer (24months) review er 2021 2022 6. Environmental 72,000.00 IC Post Novemb January Specialist review er 2021 2022 (24months) 7. Social & Safeguard 72,000.00 IC Post Novemb January engagement specialist review er 2021 2022 (24months) 8. Community 72,000.00 IC Post Novemb January Engagement & review er 2021 2022 Communications specialist (24months) 9. Lead Civil 96,000.00 IC Post Novemb January engineer(24months) review er 2021 2022 10. Civil/Hydraulic 84,000.00 IC Post Novemb January engineer(24months) review er 2021 2022 11. Junior IT/ digital 48,000.00 IC Post Novemb January D communication review er 2021 2022 specialist (24months) 12. Individual Consultant 50,000.00 IC Post Novemb December for the conduct of ESMF review er 2021 2021 13. Individual Consultant $50,000.0 IC Post Novemb December for the conduct of RPF 0 review er 2021 2021 14. Consulting Firm for the 400,000.0 QCBS Prior Decemb March 2022 conduct of ESIA, RAP, 0 review er 2021 ESMP, OHSP, LMP Consultancy Services $300,000. QCBS Prior December January 2022 for Technical Assistance 00 review 2021 to the PMU Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub- consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub- contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Liberia : Liberia Urban Resilience Project PLAN General Information Country: Liberia 2021-11-19 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169718 GPN Date: 2023-05-24 Project Name: Liberia Urban Resilience Project Loan / Credit No: / , IDA / V3930, IDA / 71220, IDA / E0410 Ministry of Public Works Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-MPW-360151-CW-RFQ / C Request for Quota Climate Resilient Infrastruct Request for Quota Single Stage - One E Under Imple 2024-01-0 leaning of Drainage Facilities IDA / 71220 Post Limited tions (Non Bank-S 96,687.50 0.00 2023-05-10 2023-05-18 2023-07-05 ure and Urban Upgrading tions nvelope mentation 1 for LURP in Bushrod Island PD) LR-MPW-360152-CW-RFQ / C Request for Quota Climate Resilient Infrastruct Request for Quota Single Stage - One E Under Imple 2024-01-0 leaning of Drainage Facilities IDA / 71220 Post Limited tions (Non Bank-S 64,902.50 0.00 2023-05-10 2023-05-18 2023-07-05 ure and Urban Upgrading tions nvelope mentation 1 for LUPR in Paynesville PD) LR-MPW-360155-CW-RFQ / C Request for Quota Climate Resilient Infrastruct Request for Quota Single Stage - One E Under Imple 2024-01-0 leaning of Drainage Facilities IDA / 71220 Post Limited tions (Non Bank-S 87,210.00 0.00 2023-05-10 2023-05-18 2023-07-05 ure and Urban Upgrading tions nvelope mentation 1 for LURP in Central Monrovia PD) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MPW-263581-GO-RFQ / P Request for Quota Single Stage - One E / Project Management Post Open - National 15,000.00 0.00 Canceled 2022-01-19 2022-03-02 2022-05-01 urchase and Supply of Office tions nvelope equipment LR-MPW-263569-GO-RFQ / P Request for Quota Single Stage - One E / Project Management Post Open - National 7,500.00 0.00 Canceled 2022-01-15 2023-02-06 2022-02-26 2022-04-27 urchase and Supply of Office tions nvelope Furniture LR-MPW-263766-GO-RFQ / P Request for Quota Single Stage - One E / Project Management Post Open - National 96,000.00 0.00 Canceled 2022-01-25 2022-03-08 2022-06-06 urchase and supply of Vehicl tions nvelope e LR-MPW-341388-GO-RFQ / S Request for Quota Single Stage - One E IDA / 71220 Project Management Post Limited 7,500.00 0.00 Signed 2023-02-08 2023-02-08 2023-04-01 2023-05-31 upply & Delivery of Office Fur tions nvelope niture LR-MPW-341402-GO-RFQ / S Request for Quota Single Stage - One E IDA / 71220 Project Management Post Limited 15,000.00 0.00 Signed 2023-02-08 2023-02-08 2023-03-08 2023-05-07 upply & Delivery of Office Eq tions nvelope uipment LR-MPW-352210-GO-RFB / Pr Request for Quota Single Stage - One E ocurement and Delivery Mot IDA / E0410 Project Management Post Open - National 130,500.00 0.00 Canceled 2023-04-01 2023-05-27 2023-11-23 tions nvelope or Vehicles For PMU LR-MPW-352905-GO-RFQ / P Request for Quota Single Stage - One E Under Imple rocurement & Delivery of Mo IDA / E0410 Project Management Post Limited 130,500.00 0.00 2023-04-02 2023-03-29 2023-05-28 2023-11-24 tions nvelope mentation tor vehicles for PMU LR-MPW-358886-GO-RFQ / P Request for Quota Single Stage - One E Under Imple rocurement, Delivery & Instal IDA / 71220 Project Management Post Limited 49,075.20 0.00 2023-05-09 2023-05-04 2023-07-04 2023-10-02 tions nvelope mentation lation of 25kVA Solar Power S ystem for PMU NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MPW-263267-CS-QCBS / Climate Resilient Infrastruct Quality And Cost- Open - Internationa Under Implement / Post 400,000.00 0.00 2021-12-20 2021-12-27 2022-01-10 2022-02-21 2022-03-21 2022-04-11 2022-05-16 2022-06-20 2023-03-17 Conduct of ESIA, RAP, ESMP, ure and Urban Upgrading Based Selection l ation OHSP, LMP LR-MPW-263712-CS-QCBS / Quality And Cost- Open - Internationa Pending Impleme / Project Management Post 300,000.00 0.00 2022-01-10 2022-01-31 2022-03-07 2022-04-04 2022-04-25 2022-05-23 2022-06-20 2023-06-20 Technical Assistance to the P Based Selection l ntation MU LR-MPW-270591-CS-QCBS / Climate Resilient Infrastruct Quality And Cost- Open - Internationa Under Implement Consulting Services for Feasi / Post 900,000.00 0.00 2021-12-27 2022-04-09 2022-01-17 2022-05-16 2022-03-02 2022-09-22 2022-03-30 2022-11-21 2022-04-29 2023-06-06 2022-06-03 2022-07-08 2023-04-04 ure and Urban Upgrading Based Selection l ation bility Studies & Design LR-MPW-263588-CS-CQS / C Climate Resilient Infrastruct Consultant Qualifi Open - Internationa onsulting service for the con / Post 250,000.00 0.00 Canceled 2021-12-20 2022-01-10 2022-02-23 2022-03-25 2022-04-29 2022-10-26 ure and Urban Upgrading cation Selection l duct of Hydro/topo/bathymet ric surveys LR-MPW-360812-CS-QCBS / Consultancy Services for Spa Strengthening Integrated Re tial Development & Infrastruc Quality And Cost- Open - Internationa Under Implement IDA / 71220 silient Urban Development C Prior 1,050,000.00 0.00 2023-05-10 2023-05-10 2023-05-31 2023-05-24 2023-07-14 2023-08-11 2023-09-10 2023-10-15 2023-11-19 2024-11-18 ture Investment Plans for Gre Based Selection l ation apacity ater Monrovia, including Floo d Risk Assessment ToR in Fiv e Urban areas in Liberia LR-MPW-365332-CS-CQS / C onsultancy Services for Const Strengthening Integrated Re Consultant Qualifi Open - Internationa Under Implement ruction Supervision of Chees IDA / 71220 silient Urban Development C Post 350,000.00 0.00 2023-06-08 2023-06-12 2023-06-29 2023-06-12 2023-08-12 2023-09-11 2023-10-16 2024-04-13 cation Selection l ation emanburg Landfill Developm apacity ent (Design & Build) Contract INDIVIDUAL CONSULTANTS Page 1 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MPW-263802-CS-INDV / C Climate Resilient Infrastruct Individual Consult onsulting Services for Enviro / Post Limited 50,000.00 0.00 Completed 2021-11-25 2021-11-25 2021-11-30 2021-11-25 2021-12-21 2022-02-03 2022-01-11 2022-04-11 ure and Urban Upgrading ant Selection nmental Social Management Framework LR-MPW-263805-CS-INDV / C Climate Resilient Infrastruct Individual Consult onsulting Services for the co / Post Limited 50,000.00 0.00 Completed 2021-11-25 2021-11-25 2021-11-30 2021-11-25 2021-12-21 2022-01-31 2022-01-11 2022-04-11 ure and Urban Upgrading ant Selection nduct of Resettlement Policy Framework LR-MPW-288612-CS-INDV / P Individual Consult IDA / V3930 Project Management Post Open 132,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-05 2022-06-16 2022-09-30 2022-07-21 2023-01-17 roject Manager ant Selection LR-MPW-288618-CS-INDV / E Individual Consult IDA / V3930 Project Management Post Open 72,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-05 2022-06-16 2022-11-30 2022-07-21 2023-01-17 nvironment Safeguard Speci ant Selection alist LR-MPW-288656-CS-INDV / S Individual Consult IDA / V3930 Project Management Post Open 72,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-05 2022-06-16 2022-09-29 2022-07-21 2023-01-17 ocial Safeguards & Gender S ant Selection pecialist LR-MPW-288659-CS-INDV / C Individual Consult onsultancy for Community En IDA / V3930 Project Management Post Open 72,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-05 2022-06-16 2022-09-30 2022-07-21 2023-01-17 ant Selection gagement & Communication Specialist LR-MPW-288661-CS-INDV / C Individual Consult onsultancy Service for Senior IDA / V3930 Project Management Post Open 96,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-06 2022-06-16 2022-09-30 2022-07-21 2023-01-17 ant Selection Procurement Specialist LR-MPW-288662-CS-INDV / p Individual Consult IDA / V3930 Project Management Post Open 72,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-06 2022-06-16 2022-09-30 2022-07-21 2023-01-17 rocurement Specialist ant Selection LR-MPW-288663-CS-INDV / c Individual Consult IDA / V3930 Project Management Post Open 72,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-06 2022-06-16 2022-09-30 2022-07-21 2023-01-17 onsultancy services for Finan ant Selection cial Officer LR-MPW-288664-CS-INDV / c Individual Consult onsultancy Service for Civil E IDA / V3930 Project Management Post Open 96,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-05 2022-06-16 2022-09-27 2022-07-21 2023-01-17 ant Selection ngineer/Hydraulic Engineer LR-MPW-288665-CS-INDV / c Individual Consult IDA / V3930 Project Management Post Open 72,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-05 2022-06-16 2022-09-27 2022-07-21 2023-01-17 onsultancy Services for Civil ant Selection Engineer LR-MPW-288666-CS-INDV / C Individual Consult onsultancy Services for IT/Di IDA / V3930 Project Management Post Open 48,000.00 0.00 Signed 2022-04-07 2022-04-18 2022-05-26 2022-09-06 2022-06-16 2022-09-30 2022-07-21 2023-01-17 ant Selection gital Communication Speciali st LR-MPW-361168-CS-INDV / H Strengthening Integrated Re Individual Consult Direct - Internation Under Implement ire of Solid Waste Manageme IDA / 71220 silient Urban Development C Prior 300,000.00 0.00 2023-05-12 2023-05-23 2023-05-22 2023-06-27 2023-06-12 2023-07-17 2024-01-13 ant Selection al ation nt (SWM) Technical Advisor apacity Page 2 Liberia: Ministry of Commerce & Industry Project Name: Liberia Investment, Finance and Trade (P171997) Loan #: P171997 PROCUREMENT PLAN (Textual Part) Project information: Liberia Investment, Finance and Trade (P171997) (P171997) Project Implementation agency: Ministry of Commerce & Industry Date of the Procurement Plan: November 2021 Period covered by this Procurement Plan: November 2021 to July 2022 ( PPA Procurement Plan) Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (Revised November 2017, August 2018 and November 2021 ) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works).Not Applicable. Goods: is not applicable Works: is not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable Other Relevant Procurement Information. The project may use the CDD procurement under this project. If required, CDD manual will be produced by the project. PROCUREMENT Liberia : Liberia Investment, Finance and Trade Project PLAN General Information Country: Liberia 2022-02-09 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171997 GPN Date: Project Name: Liberia Investment, Finance and Trade Project Loan / Credit No: IDA / V3830, IDA / D9690 Ministry of Commerce and Industry Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOCI-276208-GO-RFQ / P Component 1: Investment Cl Request for Quota Single Stage - One E rocurement of PIU Equipment IDA / V3830 Post Open - National 20,000.00 0.00 Canceled 2022-01-12 2022-03-09 2022-09-05 imate and Trade tions nvelope (Computer, Printer , Photoco pier LR-MOCI-276210-GO-RFQ / P Component 1: Investment Cl Request for Quota Single Stage - One E IDA / V3830 Post Open - National 20,000.00 0.00 Canceled 2022-01-12 2022-03-09 2022-09-05 rocurement of PIU Equipment imate and Trade tions nvelope (Funiture) LR-MOCI-276194-GO-RFQ / P Component 1: Investment Cl Request for Quota Single Stage - One E rocurement of Hardware to s IDA / V3830 Post Open - National 92,600.00 0.00 Canceled 2022-01-12 2022-03-09 2022-09-05 imate and Trade tions nvelope afeguard LBR Data LR-MOCI-276175-GO-RFQ / P Component 1: Investment Cl Request for Quota Single Stage - One E IDA / V3830 Post Open - National 50,000.00 0.00 Canceled 2022-03-19 2022-05-14 2022-11-10 rocurmentt of Vehicle imate and Trade tions nvelope LR-MOCI-289791-GO-RFQ / P Component 4: Project Imple Request for Quota Single Stage - One E IDA / V3830 Post Limited 50,000.00 0.00 Signed 2022-03-19 2022-02-28 2022-05-14 2022-11-10 rocurement of Vehicle mentation, M&E and CERC tions nvelope LR-MOCI-289794-GO-RFQ / P Component 4: Project Imple Request for Quota Single Stage - One E rocurement of Hardware to s IDA / V3830 Post Limited 92,600.00 0.00 Signed 2022-01-27 2022-02-28 2022-03-24 2022-09-20 mentation, M&E and CERC tions nvelope afeguard LBR Data LR-MOCI-289789-GO-RFQ / P Component 4: Project Imple Request for Quota Single Stage - One E rocurement of PIU Equipment IDA / V3830 Post Limited 20,000.00 0.00 Signed 2022-01-12 2022-02-28 2022-03-09 2022-09-05 mentation, M&E and CERC tions nvelope (Computer, Printer , Photoco pier LR-MOCI-289790-GO-RFQ / P Component 4: Project Imple Request for Quota Single Stage - One E IDA / V3830 Post Limited 20,000.00 0.00 Signed 2022-01-12 2022-02-28 2022-03-09 2022-09-05 rocurement of PIU Equipment mentation, M&E and CERC tions nvelope (Funiture) LR-MOCI-361340-GO-RFQ / P Component 1: Investment Cl Request for Quota Single Stage - One E Pending Impl rocurement of Vehicles for th IDA / D9690 Post Limited 450,000.00 0.00 2023-06-05 2023-07-31 2024-01-27 imate and Trade tions nvelope ementation e PIU and other TIMAS. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOCI-355173-CS-QCBS / Consultancy Services to Man Component 2: SME Access t Quality And Cost- Open - Internationa IDA / D9690 Post 266,667.67 0.00 Canceled 2023-04-20 2023-04-10 2023-04-25 2023-04-13 2023-06-09 2023-07-07 2023-08-06 2023-09-10 2023-10-15 2024-10-14 age and Implement SME Tec o Markets and Finance Based Selection l hnical Assistance Program. LR-MOCI-360850-CS-QCBS / Consultancy Services to Man Component 2: SME Access t Quality And Cost- Open - Internationa Under Implement IDA / D9690 Prior 3,000,000.00 0.00 2023-05-31 2023-05-11 2023-06-21 2023-05-12 2023-08-04 2023-09-01 2023-10-01 2023-11-05 2023-12-10 2024-12-09 age and Implement SME Tec o Markets and Finance Based Selection l ation hnical Assistance Program. LR-MOCI-361331-CS-CQS / H iring of Consulting Firm to Up grade, Expand, and Maintain Component 2: SME Access t Consultant Qualifi Open - Internationa Under Implement IDA / D9690 Post 225,000.00 0.00 2023-05-31 2023-06-13 2023-06-21 2023-06-25 2023-08-04 2023-09-03 2023-10-08 2024-04-05 the Liberia’s Concessions Inf o Markets and Finance cation Selection l ation ormation System (CIMS) and automate the National Burea u of Concession's website. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOCI-276196-CS-INDV / Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 40,000.00 0.00 Canceled 2021-09-07 2021-10-26 2021-11-16 2021-12-21 2022-06-19 ESMF Consultancy Recruitme imate and Trade ant Selection nt LR-MOCI-276173-CS-INDV / Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 20,000.00 0.00 Canceled 2022-01-07 2022-02-25 2022-03-18 2022-04-22 2022-10-19 Recruitment of Project Assist imate and Trade ant Selection ant MOCI-REF-4 / PPSD Consulta Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 9,500.00 0.00 Canceled 2021-11-16 2022-01-04 2022-01-25 2022-03-01 2022-08-28 ncy Recruitment imate and Trade ant Selection LR-MOCI-276198-CS-INDV / Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 42,000.00 0.00 Signed 2021-11-24 2022-03-30 2022-01-12 2022-02-09 2022-02-02 2022-08-10 2022-03-09 2022-09-05 PIU Procurement Specialist R imate and Trade ant Selection ecruitment Page 1 LR-MOCI-276209-CS-INDV / Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 72,000.00 0.00 Signed 2021-11-24 2022-03-30 2022-01-12 2022-06-26 2022-02-02 2022-06-29 2022-03-09 2022-09-05 PIU Project Coordinator Recru imate and Trade ant Selection itment LR-MOCI-276206-CS-INDV / Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 42,000.00 0.00 Signed 2022-01-07 2022-03-30 2022-02-25 2022-09-01 2022-03-18 2022-09-01 2022-04-22 2022-10-19 PIU Finance Officer Recruitm imate and Trade ant Selection ent LR-MOCI-276195-CS-INDV / Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 20,000.00 0.00 Canceled 2022-05-08 2022-06-26 2022-07-17 2022-08-21 2023-02-17 Preparation Loan Administrat imate and Trade ant Selection ion Manual LR-MOCI-276197-CS-INDV / Component 1: Investment Cl Individual Consult Preparation of Detailed Proje IDA / V3830 Post Open 30,000.00 0.00 Canceled 2022-05-08 2022-06-26 2022-07-17 2022-08-21 2023-02-17 imate and Trade ant Selection ct operations Manual LR-MOCI-276199-CS-INDV / Component 1: Investment Cl Individual Consult Consultant to Develop a blue IDA / V3830 Post Open 82,900.00 0.00 Canceled 2022-05-08 2022-06-26 2022-07-17 2022-08-21 2023-02-17 imate and Trade ant Selection print for National single Wind ow LR-MOCI-276204-CS-INDV / Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 20,000.00 0.00 Canceled 2022-05-08 2022-06-26 2022-07-17 2022-08-21 2023-02-17 SME TA Manual imate and Trade ant Selection LR-MOCI-276203-CS-INDV / Procurement of consultancy Component 1: Investment Cl Individual Consult services to carry out prelimin IDA / V3830 Post Open 60,000.00 0.00 Canceled 2022-05-08 2022-06-26 2022-07-17 2022-08-21 2023-02-17 imate and Trade ant Selection ary capacity building for stak eholders of Credit Registry LR-MOCI-276207-CS-INDV / Procurement of consultancy Component 1: Investment Cl Individual Consult IDA / V3830 Post Open 60,000.00 0.00 Canceled 2022-05-08 2022-06-26 2022-07-17 2022-08-21 2023-02-17 services to carry out prelimin imate and Trade ant Selection ary capacity building for stak eholders of the switch LR-MOCI-289797-CS-INDV / Component 4: Project Imple Individual Consult IDA / V3830 Post Limited 9,500.00 0.00 Signed 2021-11-16 2023-03-09 2021-11-21 2021-10-22 2021-12-12 2023-03-14 2022-01-16 2022-07-15 PPSD Consultancy Recruitme mentation, M&E and CERC ant Selection nt LR-MOCI-289795-CS-INDV / Component 4: Project Imple Individual Consult IDA / V3830 Post Limited 40,000.00 0.00 Signed 2021-09-07 2023-03-14 2021-09-12 2022-12-13 2021-10-03 2022-06-15 2021-11-07 2022-05-06 ESMF Consultancy Recruitme mentation, M&E and CERC ant Selection nt LR-MOCI-307953-CS-INDV / Component 4: Project Imple Individual Consult IDA / V3830 Post Open - National 60,000.00 0.00 Signed 2021-09-07 2021-09-19 2021-10-26 2022-08-10 2021-11-16 2022-08-10 2021-12-21 2022-06-19 SME Specialist Recruitment mentation, M&E and CERC ant Selection LR-MOCI-307959-CS-INDV / Component 4: Project Imple Individual Consult IDA / V3830 Post Open - National 42,000.00 0.00 Signed 2021-09-07 2021-09-19 2021-10-26 2022-07-28 2021-11-16 2022-08-12 2021-12-21 2022-06-19 Environmental Specialist Rec mentation, M&E and CERC ant Selection ruitment LR-MOCI-307958-CS-INDV / Component 4: Project Imple Individual Consult IDA / V3830 Post Open - National 42,000.00 0.00 Signed 2021-09-07 2021-09-19 2021-10-26 2022-08-08 2021-11-16 2022-08-08 2021-12-21 2022-06-19 Social Specialist Recruitment mentation, M&E and CERC ant Selection LR-MOCI-307955-CS-INDV / F Component 4: Project Imple Individual Consult inancial Sector Development IDA / V3830 Post Open - National 60,000.00 0.00 Signed 2021-09-07 2021-09-19 2021-10-26 2022-09-01 2021-11-16 2022-09-01 2021-12-21 2022-06-19 mentation, M&E and CERC ant Selection Specialist Recruitment LR-MOCI-345261-CS-INDV / Consultancy Services to Asse Component 3: Digital Financi Individual Consult Direct - Internation ss the National Electronic Pa IDA / V3830 Post 35,000.00 0.00 Signed 2023-02-28 2023-03-20 2023-03-10 2023-04-13 2023-03-31 2023-04-14 2023-05-05 2023-11-01 al Services Infrastructure ant Selection al yment Switch (NEPS) Data C enters at the Central Bank of Liberia LR-MOCI-345265-CS-INDV / Hiring a consultant to conduc t Feasibility Studies and Dev Component 3: Digital Financi Individual Consult Direct - Internation IDA / V3830 Post 35,000.00 0.00 Signed 2023-02-28 2023-02-23 2023-03-10 2023-04-14 2023-03-31 2023-04-14 2023-05-05 2023-11-01 elop Business Case on the N al Services Infrastructure ant Selection al ATIONAL ELECTRONIC PAYME NT SWITCH (NEPS) at the Ce ntral Bank of Liberia (CBL). LR-MOCI-345363-CS-INDV / Component 4: Project Imple Individual Consult Recruitment of Project Procur IDA / D9690 Post Limited 18,000.00 0.00 Signed 2023-03-03 2023-03-06 2023-03-08 2023-06-02 2023-03-29 2023-06-02 2023-04-20 2023-07-01 mentation, M&E and CERC ant Selection ement Assistant for the LIFT PIU. LR-MOCI-348367-CS-INDV / Hiring of Consultant to devel Component 4: Project Imple Individual Consult IDA / D9690 Post Limited 48,000.00 0.00 Signed 2023-03-31 2023-04-14 2023-04-05 2021-09-15 2023-04-26 2021-09-10 2023-05-31 2023-11-27 op Environmental and Social mentation, M&E and CERC ant Selection Management Framework (ES MF) for the LIFT Project. LR-MOCI-358442-CS-INDV / Component 1: Investment Cl Individual Consult Under Implement Hiring of ICT Expert for the L IDA / D9690 Post Open - National 20,000.00 0.00 2023-04-30 2023-04-26 2023-06-18 2023-07-09 2023-08-13 2024-02-09 imate and Trade ant Selection ation abria Business Registry (LBR) . LR-MOCI-358443-CS-INDV / Component 1: Investment Cl Individual Consult Under Implement Hiring of Corporate Lawyer fo IDA / D9690 Post Open - National 12,000.00 0.00 2023-04-30 2023-04-26 2023-06-18 2023-07-09 2023-08-13 2024-02-09 imate and Trade ant Selection ation r the Liberia Business Registr y LR-MOCI-361326-CS-INDV / Consultancy Services to Provi de Technical Assistance on C Component 2: SME Access t Individual Consult Open - Internationa Under Implement IDA / D9690 Post 120,000.00 0.00 2023-05-31 2023-06-13 2023-07-19 2023-08-09 2023-09-13 2024-03-11 oncessions Monitoring, Evalu o Markets and Finance ant Selection l ation ation and Compliance at the National Bureau of Concessio ns. LR-MOCI-363913-CS-INDV / Component 1: Investment Cl Individual Consult Open - Internationa Under Implement Hiring of SME Advisor for the IDA / D9690 Post 120,000.00 0.00 2023-06-15 2023-05-29 2023-08-03 2023-08-24 2023-09-28 2024-03-26 imate and Trade ant Selection l ation Ministry of Commerce and In dustry. LR-MOCI-364199-CS-INDV / Hiring of Consultant to Devel op Request for Bid for the Na Component 3: Digital Financi Individual Consult Open - Internationa tional Electronic Payment Swi IDA / D9690 Post 45,000.00 0.00 Under Review 2023-06-15 2023-05-31 2023-07-19 2023-08-03 2023-08-23 2023-10-22 al Services Infrastructure ant Selection l tch (NEPS), support the revie w of the Bid Documents and selection of the appropriate v endor for the NEPS Implemen tation . Page 2 PROCUREMENT PLAN (Textual Part) Project information: The Gambia, Education Sector Support Program (P162890) Project Implementation agency: Ministry of Basic and Secondary Education Date of the Procurement Plan: Period covered by this Procurement Plan: December 2018-June 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Contracts Code - Decree-Law Number 2/2012 of 20 August 2012 of, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. - The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; - The acceptance of the Rights for the Bank to review procurement documentation and activities; When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: is not applicable Works: is not applicable Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable. Other Relevant Procurement Information. No CDD component PROCUREMENT Gambia, The : The Gambia - Education Sector Support Program PLAN General Information Country: Gambia, The 2019-02-01 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162890 GPN Date: Project Name: The Gambia - Education Sector Support Program Loan / Credit No: TF / A7053, IDA / D2800, IDA / V1320 Ministry of Basic and Secondary Education Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MOBSE/ESSP/WS/C1/001 / D elegated Management Contr Component 1. Enhancing Ac 4,943,853.4 2019-10-1 act to FIOH for the Construct IDA / D2800 cess to ECD and Basic Educa Post Direct Selection Direct 3,711,140.00 Completed 2019-03-07 2020-10-07 2019-03-12 2021-03-01 2019-04-16 2020-07-08 1 3 ion of ECD Classrooms, provi tion sion of furniture and Drilling of Boreholes with solar pump s MOBSE/ESSP/WS/C1/020 / R Component 1. Enhancing Ac ehabilitation of Sixteen (16) Request for Quota Single Stage - One E 2019-12-0 IDA / D2800 cess to ECD and Basic Educa Post Limited 126,400.00 100,428.50 Completed 2019-04-16 2019-03-18 2019-06-11 2019-04-16 Water-points (Environmental tions nvelope 8 tion Safeguard Measure) MOBSE/ESSP/WS/C3/025 / R Component 3. Technical and Request for Quota Single Stage - One E 2020-02-2 ehabilitation of former STED IDA / D2800 Post Limited 8,500.00 7,154.79 Completed 2019-07-02 2019-06-03 2019-08-27 2019-07-01 Institutional Support tions nvelope 3 office to be used as Commun ication Unit MOBSE/ESSP/WS/C2/009 / Cl Component 2. Improving Qu Request for Quota Single Stage - One E 2019-09-2 assroom rehabilitation for PSI TF / A7053 ality of Teaching and Learni Post Limited 199,000.00 99,919.32 Completed 2019-02-05 2019-05-22 2019-04-02 2019-08-15 tions nvelope 9 /PMI Centres ng MOBSE/ESSP/WS/C1/030 / R Component 1. Enhancing Ac Request for Quota Single Stage - One E Pending Imp 2020-05-1 ehabilitation of Storm damag IDA / D2800 cess to ECD and Basic Educa Post Limited 120,000.00 0.00 2019-09-17 2019-11-12 tions nvelope lementation 0 ed schools in regions 3, 5 an tion d 6 for MoBSE MOBSE/ESSP/WS/C2/035 / R Component 2. Improving Qu Request for Quota Single Stage - One E 2020-09-1 ehabilitation of additional 12 IDA / D2800 ality of Teaching and Learni Post Limited 96,000.00 92,730.88 Completed 2020-01-21 2020-01-14 2020-03-17 2020-01-29 tions nvelope 3 PSI PMI Classrooms ng MOBSE/ESSP/AF/WS/056 / Re Component 2. Improving Qu Request for Quota Request for Quota Single Stage - One E 2022-05-2 habilitation/refurbishment of TF / A7053 ality of Teaching and Learni Post Limited tions (Non Bank-S 93,360.00 117,845.65 Completed 2021-10-04 2022-04-04 2021-11-29 2022-07-04 tions nvelope 8 classroom at Gambia College ng PD) . MOBSE/ESSP/WS/C1,093 / R Component 1. Enhancing Ac Request for Quota ehabilitation of Toilets in exis Request for Quota Single Stage - One E 2023-01-0 IDA / D2800 cess to ECD and Basic Educa Post Limited tions (Non Bank-S 160,000.00 0.00 Signed 2022-05-11 2023-03-03 2022-07-06 ting schools for easy access tions nvelope 2 tion PD) by Special Needs children Request for Quota MOBSE/ESSP/WS/094 / Const Component 2. Improving Qu Request for Quota Single Stage - One E 2023-03-3 IDA / D2800 Post Limited tions (Non Bank-S 120,000.00 0.00 Completed 2022-10-12 2023-01-27 2022-11-10 ruction of 2 (Two) Warehouse ality of Teaching and Learni tions nvelope 0 PD) s for MoBSE ng MOBSE/ESSP/WORKS/097 / 1 . Completion of Classroom Fa cility, Construction of A Sewi Component 2. Improving Qu Request for Quota ng Centre and Chain Link Fen Request for Quota Single Stage - One E 2023-08-1 IDA / D2800 ality of Teaching and Learni Post Limited tions (Non Bank-S 360,000.00 0.00 Completed 2022-12-21 2022-11-22 2023-02-15 ces in Region 2 & 4 (LOT 1) tions nvelope 4 ng PD) 2. Construction of Seed/Cere al Banking Stores and Chain Link Fencing in REDs 5 and R ED 6 (LOT 2) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOBSE/ESSP/GS/C2/003 / Pri Component 2. Improving Qu Request for Quota Single Stage - One E nting of Early Grade Mathem TF / A7053 ality of Teaching and Learni Post Limited 60,000.00 23,033.31 Completed 2018-11-17 2018-11-14 2018-12-26 2018-11-30 2019-06-24 2018-12-18 tions nvelope atics (EGMA) Materials. ng MOBSE/ESSP/GS/C2/005 / Br aille embossers &machine, B Component 2. Improving Qu Single Stage - One E raille papers, Comb Binders, TF / A7053 ality of Teaching and Learni Post Request for Bids Open - National 196,250.00 156,563.85 Completed 2019-01-29 2019-04-03 2019-02-03 2019-03-17 2019-05-21 2019-04-16 2019-06-06 2019-05-21 2019-07-01 2019-11-17 2019-09-19 nvelope Scanner, Laptop (braille), Sp ng eech reader's software, Heari ng aids, eye lenses. MOBSE/ESSP/GS/C2/006 / Fu Component 2. Improving Qu Request for Quota Single Stage - One E TF / A7053 Post Limited 168,660.00 244,278.30 Completed 2019-01-28 2018-05-08 2019-03-25 2018-07-07 2019-09-21 2018-07-07 el for Coordination and Monit ality of Teaching and Learni tions nvelope oring ng MOBSE/ESSP/GS/C1/010 / Fa Component 1. Enhancing Ac Request for Quota Single Stage - One E IDA / D2800 Post Limited 150,000.00 116,395.85 Completed 2019-04-22 2019-07-15 2019-06-17 2019-08-26 2019-12-14 brication of customized Donk cess to ECD and Basic Educa tions nvelope ey Carts tion MOBSE/ESSP/GS/C3/013 / La ptops& Photocopiers for GC, Projectors, Screens, Calendar Component 3. Technical and Single Stage - One E s, Video conference tools, Mo TF / A7053 Post Request for Bids Open - National 161,170.00 167,499.97 Completed 2019-02-11 2019-06-06 2019-02-16 2019-03-30 2019-07-11 2019-04-29 2019-07-22 2019-06-03 2019-08-07 2019-11-30 2021-05-20 Institutional Support nvelope bile and Wireless printers for SMT with toners, UPS, Printe rs, Cameras, Computers/Lapt ops (hardware and software) for MoBSE MOBSE/ESSP/C3/GS/004 / Co Component 3. Technical and Request for Quota Single Stage - One E mmunications Equipment for TF / A7053 Post Limited 25,000.00 32,605.46 Completed 2018-11-28 2018-11-26 2019-01-23 2018-12-18 2019-07-22 2019-01-22 Institutional Support tions nvelope MoBSE Communications Unit MOBSE/ESSP/GS/C1/15 / San Component 1. Enhancing Ac itary Pads for Girls in Basic C Request for Quota Single Stage - One E TF / A7053 cess to ECD and Basic Educa Post Limited 85,000.00 86,287.19 Completed 2019-03-26 2019-03-14 2019-05-21 2019-04-18 2019-11-17 2019-05-15 ycle, Upper Basic and Senior tions nvelope tion Secondary School in regions Three to Six MOBSE/ESSP/GS/C2/16 / Co Component 2. Improving Qu Request for Quota Single Stage - One E mputers & Other Accessories IDA / D2800 ality of Teaching and Learni Post Limited 24,000.00 19,104.19 Completed 2019-03-13 2019-03-13 2019-05-08 2019-04-27 2019-11-04 2019-11-21 tions nvelope for PMI & PSI ng Page 1 MOBSE/ESSP/GS/C3/018 / Mo Component 3. Technical and Request for Quota Single Stage - One E biles Phones for Data collecti TF / A7053 Post Limited 100,000.00 101,074.63 Completed 2019-04-07 2019-04-06 2019-06-02 2019-06-29 2019-11-29 2019-07-31 Institutional Support tions nvelope on in schools and Tablets for Senior Managers MOBSE/ESSP/GS/C2/022 / So Component 2. Improving Qu Request for Quota Single Stage - One E lar Chargers for the play to l IDA / D2800 ality of Teaching and Learni Post Limited 28,000.00 64,991.58 Completed 2019-04-21 2019-04-15 2019-06-16 2019-05-14 2019-12-13 2019-05-14 tions nvelope earn Tablets ng MOBSE/ESSP/GS/C1/021 / W Component 2. Improving Qu hite Boards, Projectors, Click IDA / D2800 ality of Teaching and Learni Post Direct Selection Direct 225,000.00 178,579.72 Completed 2019-04-11 2019-04-18 2019-04-16 2019-04-19 2019-05-21 2019-09-21 2019-11-17 2019-11-12 ers and Installations ng MOBSE/ESSP/CS/C2/025 / Te Component 2. Improving Qu Request for Quota Single Stage - One E aching and Learning Materia IDA / D2800 ality of Teaching and Learni Post Limited 25,000.00 16,691.22 Completed 2019-06-01 2019-09-12 2019-07-27 2019-09-23 2020-01-23 2019-09-28 tions nvelope ls for Second Chance ng MOBSE/ESSP/GS/C3/008 / Fu Component 3. Technical and Request for Quota Single Stage - One E rniture & Fixture for the Minis TF / A7053 Post Limited 80,000.00 74,688.31 Completed 2019-01-27 2018-11-12 2019-03-24 2019-01-06 2019-09-20 2019-08-09 Institutional Support tions nvelope try of Basic and Secondary E ducation (MoBSE) MOBSE/ESSP/GS/C2/029 / Pri Component 2. Improving Qu Request for Quota Single Stage - One E nting of revised ECD (GOALS) IDA / D2800 ality of Teaching and Learni Post Limited 20,000.00 17,173.66 Completed 2019-09-18 2019-09-06 2019-11-13 2019-09-18 2020-05-11 2019-10-14 tions nvelope Curriculum Level 1, Term 1,2 ng and 3 MOBSE/ESSP/GS/C2/002 / Pr Component 2. Improving Qu UN Agencies (Dire ocurement of Vehicles for Mo TF / A7053 ality of Teaching and Learni Post Direct 804,670.00 0.00 Canceled 2019-03-07 2019-03-11 2019-03-12 2019-04-16 2019-10-13 ct) BSE and MoHERST (Replace ng ment of old ones) MOBSE/ESSP/GS/C2/002/14 / Procurement of Vehicles for MoBSE and MoHERST (Replac Component 2. Improving Qu UN Agencies (Dire ement of Old ones) and Moto TF / A7053 ality of Teaching and Learni Post Direct 994,670.00 938,776.65 Completed 2019-03-07 2019-03-11 2019-03-12 2019-03-05 2019-04-16 2019-04-27 2019-10-13 2019-09-06 ct) rcycles (for Cluster Monitors, ng Itinerant Teachers ,Special N eeds and ECD Focal Points) t hrough UNOPS MOBSE/ESSP/GS/C2/14 / Pro curement of Motor cycles (Cl Component 2. Improving Qu UN Agencies (Dire uster Monitors, Itinerant Teac IDA / V1320 ality of Teaching and Learni Prior Direct 190,000.00 0.00 Canceled 2019-03-07 2019-03-12 2019-04-16 2019-10-13 ct) hers ,Special Needs and ECD ng Focal Points) through UNOP S MOBSE/ESSP/GS/C2/033 / Pri nting of ECD (GOALS) Curricu Component 2. Improving Qu Request for Quota Single Stage - One E lum Level 2 and 3, Terms 1,2 IDA / D2800 ality of Teaching and Learni Post Limited 25,000.00 16,124.97 Completed 2019-11-30 2019-11-20 2020-01-25 2019-12-10 2020-07-23 2020-01-14 tions nvelope &3 and ECD Rhymes, songs a ng nd Games to support the GO ALS. MOBSE/ESSP/GS/C2/007 / Pri Component 2. Improving Qu Request for Quota Single Stage - One E TF / A7053 Post Limited 40,000.00 0.00 Canceled 2019-02-11 2019-04-08 2019-10-05 nting of Modules ality of Teaching and Learni tions nvelope ng MOBSE/ESSP/GS/C2/039 / Si Component 2. Improving Qu Request for Quota Single Stage - One E x (6) Motor Cycles for Monito IDA / D2800 ality of Teaching and Learni Post Limited 45,000.00 24,347.82 Completed 2020-02-24 2020-03-20 2020-04-20 2020-04-21 2020-10-17 2020-04-21 tions nvelope ring Play to Learn ng MOBSE/ESSP/GS/C2/041 / Pri Component 2. Improving Qu Request for Quota Single Stage - One E Pending Impl nting of Assessment Policies IDA / D2800 ality of Teaching and Learni Post Limited 40,000.00 0.00 2020-04-19 2020-06-14 2020-12-11 tions nvelope ementation and documents for the Asses ng sment Unit MOBSE/ESSP/GS/C2/037 / Fu Component 2. Improving Qu Single Stage - One E IDA / D2800 Post Request for Bids Limited 325,000.00 244,559.24 Completed 2020-01-30 2020-02-10 2020-02-04 2020-02-10 2020-03-17 2020-02-19 2020-04-16 2020-02-19 2020-05-21 2018-07-07 2020-11-17 2018-07-07 el for Monitoring ality of Teaching and Learni nvelope ng MOBSE/ESSP/GS/C2/038 / Pu Component 2. Improving Qu rchase Tablets for the play to Request for Quota Single Stage - One E IDA / D2800 ality of Teaching and Learni Post Limited 90,000.00 86,538.47 Completed 2020-02-15 2020-01-23 2020-04-11 2020-01-29 2020-10-08 2020-02-21 Learn and 6 laptops and a pri tions nvelope ng nter for the Assessment Uni t MOBSE/ESSP/GS/C3/042 / Pr Component 3. Technical and IDA / D2800 Post Direct Selection Direct 9,000.00 9,011.44 Completed 2020-02-07 2020-02-05 2020-02-12 2020-01-07 2020-03-18 2020-02-08 2020-09-14 2020-02-08 ovision of Internet facility for Institutional Support PCU MOBSE/ESSP/GS/C2/044 / Pr ocurement of Heavy duty lar Component 2. Improving Qu ge Mats for distribution to th Request for Quota Single Stage - One E IDA / D2800 ality of Teaching and Learni Post Limited 71,000.00 69,528.83 Completed 2020-07-13 2020-07-10 2020-09-07 2020-07-28 2021-03-06 2020-09-03 e 3-6 communities based ce tions nvelope ng nters in region 2 and 6 and al l annexed ECD Centers in Re gions 1 to 6. MOBSE/ESSP/GS/C3/045 / Vi deo Conference facilities for t Component 3. Technical and Request for Quota Single Stage - One E IDA / D2800 Post Limited 71,500.00 69,524.28 Completed 2020-10-26 2020-10-28 2020-12-21 2020-12-10 2021-06-19 2021-04-10 he Ministry of Basic and Seco Institutional Support tions nvelope ndary Education Headquarter s MOBSE/ESSP/GS/C3/046 / Pr Component 3. Technical and Request for Quota Single Stage - One E ocurement of Office Equipme IDA / D2800 Post Limited 20,000.00 14,524.29 Completed 2020-12-15 2020-11-06 2021-02-09 2020-12-15 2021-08-08 2020-12-22 Institutional Support tions nvelope nt for MoBSE MOBSE/ESSP/GS/C3/047 / Fu Component 3. Technical and Request for Quota Single Stage - One E IDA / D2800 Post Limited 200,000.00 0.00 Completed 2021-01-18 2021-01-21 2021-03-15 2021-09-11 2023-06-21 el for Coordination Institutional Support tions nvelope MOBSE/ESSP/GS/C1/50 / Pro Component 1. Enhancing Ac vision of Sanitary Pads for Gir Request for Quota Single Stage - One E IDA / D2800 cess to ECD and Basic Educa Post Limited 85,000.00 80,612.00 Completed 2021-02-08 2021-01-22 2021-04-05 2021-02-18 2021-10-02 2022-03-04 ls in Basic Cycle, Upper Basic tions nvelope tion and Senior Secondary School s MOBSE/ESSP/GS/C2/049 / Pr Component 2. Improving Qu Request for Quota Single Stage - One E ocurement of Server and Equ IDA / D2800 ality of Teaching and Learni Post Limited 60,000.00 60,226.27 Completed 2021-02-07 2021-04-20 2021-04-04 2021-05-19 2021-10-01 2021-07-17 tions nvelope ipment for the PCU Finance ng Unit MOBSE/ESSP/GS/C2/048 / Pr Component 2. Improving Qu ocurement of Visibilities Mate Request for Quota Single Stage - One E IDA / D2800 ality of Teaching and Learni Post Limited 35,000.00 28,818.45 Completed 2021-02-06 2021-01-14 2021-04-03 2021-02-05 2021-09-30 2021-05-07 rials (Year Planners, Calendar tions nvelope ng s and Dairies) for MoBSE MOBSE/ESSP/GS/C3/053 / Pr ocurement of anti-virus softw Component 3. Technical and Request for Quota Single Stage - One E are, cloud storage, eSignatur IDA / D2800 Post Limited 46,000.00 44,673.72 Completed 2021-07-24 2021-08-11 2021-09-18 2021-10-08 2022-03-17 2022-09-13 Institutional Support tions nvelope e, Microsoft 365 Suite & GPS tracking System (Vehicles & Motorbikes) for the MoBSE Page 2 MOBSE/ESSP/GS/C3/054 / Pr Component 3. Technical and Request for Quota Single Stage - One E ocurement of Laptops for the IDA / D2800 Post Limited 15,000.00 14,061.76 Completed 2021-07-24 2021-08-25 2021-09-18 2021-10-30 2022-03-17 2021-11-18 Institutional Support tions nvelope National EMIS Technical Tea m MOBSE/ESSP/GS/C2/055 / Pri Component 2. Improving Qu Open - Internationa Single Stage - One E nting of Core Textbooks Grad IDA / D2800 ality of Teaching and Learni Post Request for Bids 600,000.00 598,202.54 Signed 2021-07-23 2021-08-25 2021-07-28 2021-08-26 2021-09-08 2021-10-14 2021-10-08 2021-11-01 2021-11-12 2021-12-21 2022-05-11 l nvelope e 1-9 including Teachers Gui ng de MOBSE/ESSP/AF/GS/058 / Pr Component 2. Improving Qu ovision of customized device Request for Quota Single Stage - One E Pending Impl TF / A7053 ality of Teaching and Learni Post Limited 29,800.00 0.00 2021-09-27 2021-11-22 2022-05-21 s for out of school children & tions nvelope ementation ng equipment for Second Chanc e. MOBSE/ESSP/AF/GS/060 / Pr Component 2. Improving Qu ovision of Tablets for EGRA E Single Stage - One E Pending Impl TF / A7053 ality of Teaching and Learni Post Request for Bids Limited 127,600.00 0.00 2021-10-04 2021-10-09 2021-11-20 2021-12-20 2022-01-24 2022-07-23 nglish and EGMA & Robotic nvelope ementation ng Kits and 3D printers. MOBSE/ESSP/AF/GS/061 / Pr Component 2. Improving Qu eparation of posters, fliers an Request for Quota Single Stage - One E TF / A7053 ality of Teaching and Learni Post Limited 5,000.00 4,779.99 Completed 2021-10-02 2022-02-01 2021-11-27 2022-03-22 2022-05-26 2022-04-06 d stickers on COVID Message tions nvelope ng s for schools and communitie s. MOBSE/ESSP/AF/GS/062 / Fu Component 2. Improving Qu Request for Quota Single Stage - One E Pending Impl rniture and Equipment for th TF / A7053 ality of Teaching and Learni Post Limited 40,000.00 0.00 2021-10-09 2021-12-04 2022-06-02 tions nvelope ementation e offices Gambia College. ng MOBSE/ESSP/AF/GS/064 / La Component 2. Improving Qu Request for Quota Single Stage - One E TF / A7053 Post Limited 90,000.00 84,986.15 Completed 2021-10-18 2022-03-21 2021-12-13 2022-05-08 2022-06-11 2022-09-07 b equipment for Gambia Coll ality of Teaching and Learni tions nvelope ege ng MOBSE/ESSP/AF/GS/065 / Te Component 2. Improving Qu chnology to facilitate Video c TF / A7053 ality of Teaching and Learni Post Direct Selection Direct 473,000.00 443,267.16 Completed 2021-09-09 2021-09-02 2021-09-14 2021-09-09 2021-10-19 2021-09-25 2022-04-17 2022-01-18 onference and Virtual meetin ng g for the Regional offices and Gambia College. MOBSE/ESSP/AF/GS/066 / Pr ocurement of Computers for Component 2. Improving Qu Single Stage - One E Head Teachers for individual TF / A7053 ality of Teaching and Learni Post Request for Bids Limited 819,401.00 73,193.04 Completed 2021-10-13 2022-05-16 2021-10-18 2022-05-16 2021-11-29 2022-07-05 2021-12-29 2022-07-25 2022-02-02 2022-08-13 2022-08-01 nvelope student ID at school & ICT Eq ng uipment for the EMIS team a nd Gambia college. MOBSE/ESSP/AF/GS/067 / pri Component 2. Improving Qu Request for Quota Single Stage - One E Pending Impl nting of Teaching and Learni TF / A7053 ality of Teaching and Learni Post Limited 85,000.00 0.00 2021-10-18 2021-12-13 2022-06-11 tions nvelope ementation ng Materials for Gambia Colle ng ge. MOBSE/ESSP/AF/GS/068 / Pri nting and distribution of asse ssment policy, protocol and Component 3. Technical and Request for Quota Single Stage - One E Pending Impl TF / A7053 Post Limited 76,500.00 0.00 2021-09-25 2021-11-20 2022-05-19 monitoring guidelines, perfor Institutional Support tions nvelope ementation mance booklets, manuals an d forms & MoBSE newsletter for 2021 and 2022 MOBSE/ESSP/AF/GS/069 / Off Component 3. Technical and Request for Quota Single Stage - One E TF / A7053 Post Limited 80,000.00 0.00 Canceled 2021-10-24 2021-12-19 2022-06-17 ice equipment and Furniture Institutional Support tions nvelope for PCU MOBSE/ESSP/AF/GS/057 / Tw o(2) Vehicles for Gambia Coll Component 1. Enhancing Ac Request for Quota Single Stage - One E ege and 23 Motorcycles for n TF / A7053 cess to ECD and Basic Educa Post Limited 102,500.00 156,566.64 Completed 2021-10-16 2021-10-21 2021-12-11 2022-02-15 2022-06-09 2022-09-29 tions nvelope ewly recruited itinerant teach tion ers & INSET Regional Coordin ators MOBSE/ESSP/AF/GS/059 / Pri Component 2. Improving Qu nting of the revised curriculu Request for Quota Single Stage - One E TF / A7053 ality of Teaching and Learni Post Limited 17,500.00 0.00 Completed 2022-02-20 2022-10-11 2022-04-17 2022-10-14 2022-12-27 m framework and syllabi & Pr tions nvelope ng inting and distribution of the strategic plan. MOBSE/ESSP/AF/GS/C3/077 / Component 3. Technical and Request for Quota Single Stage - One E Printing of Service Level Agre TF / A7053 Post Limited 20,000.00 16,335.27 Completed 2021-09-06 2021-09-01 2021-11-01 2021-09-22 2022-04-30 2021-09-29 Institutional Support tions nvelope ements (SLAs)for the PMS MOBSE/ESSP/GS/082 / Provis Component 2. Improving Qu IDA / D2800 Post Direct Selection Direct 250,000.00 241,443.14 Completed 2022-03-23 2022-03-17 2022-03-28 2022-03-24 2022-05-02 2022-04-09 2022-10-29 2022-09-14 ion of Civic Education Textbo ality of Teaching and Learni oks ng MOBSE/ESSP/GS/083 / Provis Component 1. Enhancing Ac Request for Quota Single Stage - One E IDA / D2800 Post Limited 60,000.00 55,721.61 Completed 2022-03-26 2022-03-22 2022-05-21 2022-04-13 2022-11-17 2022-05-11 ion of sanitary pads for REDs cess to ECD and Basic Educa tions nvelope 1 and 2 tion MOBSE/ESSP/AF/GS/C1/086 / Component 1. Enhancing Ac Procurement of Wheelchairs, Request for Quota Single Stage - One E TF / A7053 cess to ECD and Basic Educa Post Limited 30,000.00 0.00 Completed 2022-04-24 2021-12-01 2022-06-19 2022-12-16 2023-02-06 Tape recorders Cassettes, an tions nvelope tion d Batteries for Students with Special Needs MOBSE/ESSP/GS/C2/087 / Pr Component 2. Improving Qu Request for Quota Single Stage - One E IDA / D2800 Post Limited 76,000.00 61,218.83 Completed 2022-04-25 2022-04-01 2022-06-20 2022-04-29 2022-12-17 2022-05-21 ocurement of 78 Laptops for ality of Teaching and Learni tions nvelope PMI-PSI ng MOBSE/ESSP/AF/GS/C2/088 / Component 2. Improving Qu Request for Quota Single Stage - One E Procurement of a Double cab TF / A7053 ality of Teaching and Learni Post Limited 40,000.00 35,961.28 Completed 2022-04-26 2022-04-25 2022-06-21 2022-05-24 2022-12-18 2023-03-22 tions nvelope in Pickup Vehicle for the INSE ng T Unit MOBSE/ESSP/AF/GS/089 / Pr Component 2. Improving Qu Request for Quota Single Stage - One E ocurement of Furniture and E TF / A7053 ality of Teaching and Learni Post Limited 22,000.00 26,319.57 Completed 2022-04-25 2022-06-01 2022-06-20 2022-06-29 2022-12-17 2022-08-23 tions nvelope quipment for INSET ng MOBSE/ESS/GS/C3/090 / Pro curement of Power backup fo Component 3. Technical and Request for Quota Single Stage - One E IDA / D2800 Post Limited 97,000.00 94,290.99 Completed 2022-05-02 2022-04-14 2022-06-27 2022-05-14 2022-12-24 2022-08-03 r the Video Conferencing faci Institutional Support tions nvelope lities for REDs and the Gambi a College MOBSE/ESSP/GS/C1/091 / Pr Component 1. Enhancing Ac ocurement of Teaching and L Request for Quota Single Stage - One E IDA / D2800 cess to ECD and Basic Educa Post Limited 98,000.00 0.00 Completed 2022-05-09 2022-07-25 2022-07-04 2022-12-31 2023-01-29 earning Materials for the Sec tions nvelope tion ond Chance Program MOBSE/ESSP/GS/95 / Procur Component 2. Improving Qu Request for Quota Single Stage - One E IDA / D2800 Post Limited 180,000.00 0.00 Completed 2022-09-27 2023-02-27 2022-11-22 2023-05-21 ement of 2 (Two) Mini-Trucks ality of Teaching and Learni tions nvelope for MoBSE ng NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Page 3 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOBSE/ESSP/AF/GS/063 / Ma Component 2. Improving Qu Request for Quota Single Stage - One E TF / A7053 Post Limited 45,000.00 67,200.00 Completed 2021-10-30 2022-04-20 2021-12-25 2022-05-16 2022-06-23 2023-03-05 nagement software for Gamb ality of Teaching and Learni tions nvelope ia College. ng CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOBSE/ESSP/CS/C3/019 / Fin Component 3. Technical and Least Cost Selecti IDA / D2800 Post Open - National 60,000.00 15,294.12 Completed 2019-04-11 2019-03-06 2019-05-02 2019-06-15 2019-04-30 2019-07-13 2019-05-21 2019-08-12 2019-05-28 2019-09-16 2019-06-11 2019-10-21 2019-07-02 2020-04-18 ancial Audit of the ESSP proj Institutional Support on ect MOBSE/ESSP/CS/C3/034 / Se rvice Delivery Indicators (SDI ) - will collect relevant Data t hat will measure both the res Component 3. Technical and Consultant Qualifi Under Implement IDA / D2800 Post Limited 78,000.00 0.00 2019-11-25 2019-11-01 2019-12-09 2019-12-10 2020-01-08 2020-02-12 2020-08-10 ource flows and quality of ser Institutional Support cation Selection ation vice provision at the school a nd health facility level using t he methodology developed b y the World Bank's program. MOBSE/ESSP/AF/CS/071 / Vir Component 2. Improving Qu Least Cost Selecti Open - Internationa Pending Impleme TF / A7053 Post 72,000.00 0.00 2021-11-11 2021-12-02 2022-01-15 2022-02-12 2022-03-14 2022-04-18 2022-05-23 2022-11-19 tual Private Network Services ality of Teaching and Learni on l ntation ng INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOBSE/ESSP/CS/C2/012 / TA Component 2. Improving Qu Individual Consult Pending Impleme IDA / D2800 Post Limited 60,000.00 0.00 2019-02-21 2019-02-26 2019-03-19 2019-04-23 2019-10-20 support assessment (NAT3, 5 ality of Teaching and Learni ant Selection ntation & 8) ng MOBSE/ESSP/CS/C2/017 / De Component 2. Improving Qu Individual Consult velopment of the Data Visual IDA / D2800 ality of Teaching and Learni Post Limited 15,000.00 9,532.62 Completed 2019-04-05 2019-01-07 2019-04-10 2019-01-09 2019-05-01 2019-06-17 2019-06-05 2019-06-25 2019-12-02 2019-11-08 ant Selection ization component of the EMI ng S MOBSE/ESSP/CS/C1/023 / So Component 1. Enhancing Ac IDA / D2800 Post Direct Selection Direct 50,000.00 50,000.00 Completed 2019-04-23 2019-04-14 2019-05-03 2019-04-18 2019-07-07 2019-05-07 2020-01-03 2021-10-07 cial Safeguard Specialist cess to ECD and Basic Educa tion MOBSE/ESSP/CS/C2/024 / Co Component 2. Improving Qu Individual Consult nsultancy Services an 2013 p IDA / D2800 ality of Teaching and Learni Post Limited 25,000.00 14,700.00 Completed 2019-05-07 2019-04-09 2019-05-12 2019-05-20 2019-06-02 2020-07-13 2019-07-07 2020-07-14 2020-01-03 2021-07-27 ant Selection opulation projection ng MOBSE/ESSP/CS/C2/026 / Co nsultancy Services for Extern al Review of the Revised Ga mbia College Teacher Educat Component 3. Technical and ion (TED) Curriculum and Del IDA / D2800 Post Direct Selection Direct 50,000.00 40,500.00 Completed 2019-07-03 2019-06-27 2019-07-13 2019-01-23 2019-09-16 2019-07-02 2020-03-14 Institutional Support ivery Model; Introduce and E xternally Reviewed and Over seen Teacher Competence T est to Evaluate Graduating T eachers; and Improve the Re vised C MOBSE/ESSP/CS/C2/028 / Co nducting teacher training on Component 2. Improving Qu Pending Impleme Progressive Science Initiative IDA / D2800 ality of Teaching and Learni Post Direct Selection Direct 86,000.00 0.00 2019-08-16 2019-08-26 2019-10-30 2020-04-27 ntation and Progressive Math Initiati ng ve and Progressive English L anguage of Art (ELA). MOBSE/ESSP/CS/C2/031 / Fie Component 2. Improving Qu Individual Consult Pending Impleme IDA / D2800 Post Limited 10,000.00 0.00 2019-11-13 2019-11-18 2019-12-09 2020-01-13 2020-07-11 ld Coordinator for the Play to ality of Teaching and Learni ant Selection ntation Learn ng MOBSE/ESSP/CS/C3/031 / Se rvice Delivery Indicators (SDI ) - will collect relevant Data t hat will measure both the res Component 3. Technical and Individual Consult IDA / D2800 Post Limited 78,000.00 0.00 Canceled 2019-11-06 2019-11-11 2019-12-02 2020-01-06 2020-07-04 ource flows and quality of ser Institutional Support ant Selection vice provision at the school a nd health facility level using t he methodology developed b y the World Bank's program. MOBSE/ESSP/CS/C2/032 / Co nsultancy services with Wars Component 2. Improving Qu aw Polytechnic Institute (WPI Pending Impleme IDA / D2800 ality of Teaching and Learni Post Direct Selection Direct 20,000.00 0.00 2019-11-08 2019-11-18 2020-01-22 2020-07-20 ) for the training of Gambian ntation ng National Trainers and PSI PMI piloted teachers on Material Science, Robotics and 3D pri nting MOBSE/ESSP/CS/C3/011 / TA Component 3. Technical and Individual Consult IDA / D2800 Post Limited 20,000.00 0.00 Canceled 2019-02-12 2019-02-17 2019-03-10 2019-04-14 2019-10-11 support EGRA, EGMA Institutional Support ant Selection MOBSE/ESSP/CS/C1/43 / TEC HNICAL SUPPORT SERVICES T O THE PROJECT COORDINATI ON UNIT, MINISTRY OF BASI Component 1. Enhancing Ac C AND SECONDARY EDUCATI IDA / D2800 cess to ECD and Basic Educa Post Direct Selection Direct 8,000.00 0.00 Completed 2020-05-15 2020-04-15 2020-05-25 2020-04-24 2020-07-29 2021-01-25 2020-06-13 ON, FOR THE PREPARATION tion OF THE ENVIRONMENTAL AN D SOCIAL COMMITMENT PLA N , THE STAKEHOLDER ENGA GEMENT PLAN AND TRAINING OF SOCIAL SPECIALIST IN TH E MANAGEM MOBSE/ESSP/CS/C2/051 / Co Component 2. Improving Qu Individual Consult nsultancy services for the Ins IDA / D2800 ality of Teaching and Learni Post Direct 20,000.00 26,068.35 Signed 2021-02-02 2021-01-29 2021-02-12 2021-01-11 2021-03-05 2021-01-18 2021-04-09 2021-02-03 2021-10-06 ant Selection titutional Audit of the Gambi ng a College MOBSE/ESSP/C3/052 / Techn ical Assistance to train the ne wly employed staff and Cust Component 3. Technical and Individual Consult IDA / D2800 Post Direct 20,000.00 20,714.69 Completed 2021-05-20 2021-05-06 2021-05-30 2021-05-14 2021-06-20 2021-05-21 2021-07-25 2021-06-01 2022-01-21 2021-06-16 omization of the ESSP Additio Institutional Support ant Selection nal Project into the accountin g software (TOMPRO)Backgro und MOBSE/ESSP/AF/CS/070 / TA Component 2. Improving Qu to support the development TF / A7053 ality of Teaching and Learni Post Direct Selection Direct 25,000.00 11,400.00 Completed 2021-09-13 2021-10-06 2021-09-23 2021-10-25 2021-11-27 2022-01-13 2022-05-26 of the INSET strategic Plan. ng Page 4 MOBSE/ESSP/AF/CS/062 / TA Component 2. Improving Qu Individual Consult TF / A7053 Post Open 150,000.00 0.00 Canceled 2021-09-28 2021-10-28 2021-11-16 2022-01-17 2021-12-07 2022-01-11 2022-07-10 English for Gambia College ality of Teaching and Learni ant Selection ng MOBSE/ESSP/AF/CS/073 / TA Component 2. Improving Qu Individual Consult TF / A7053 Post Open 150,000.00 0.00 Canceled 2021-09-28 2021-10-28 2021-11-16 2022-01-17 2021-12-07 2022-01-11 2022-07-10 Mathematics for Gambia Coll ality of Teaching and Learni ant Selection ege ng MOBSE/ESSP/AF/CS/074 / TA Component 2. Improving Qu Individual Consult TF / A7053 Post Open 150,000.00 0.00 Canceled 2021-09-30 2021-11-18 2021-12-09 2022-01-13 2022-07-12 Literacy for Gambia College ality of Teaching and Learni ant Selection ng MOBSE/ESSP/AF/CS/075 / Co Component 2. Improving Qu nsultancy Services for INSET TF / A7053 ality of Teaching and Learni Post Direct Selection Direct 65,000.00 83,699.26 Completed 2021-09-08 2021-10-07 2021-09-18 2021-10-25 2021-11-22 2022-01-20 2022-05-21 Capacity Building, Induction/ ng mentoring and Practicum MOBSE/ESSP/AF/CS/C3/075 / Consultancy Services for the Development of a Training M Component 3. Technical and Individual Consult anual on the Early Childhood TF / A7053 Post Limited 30,000.00 26,140.00 Completed 2021-09-28 2021-10-05 2021-10-03 2021-11-02 2021-10-24 2021-11-01 2021-11-28 2021-11-19 2022-05-27 2022-05-28 Institutional Support ant Selection Development (ECD) - Gambia Open Learning Spaces (Goals ) Curriculum and Lead the Tr aining of Trainers (TOT). MOBSE/ESSP/AF/CS/C2/078 / Component 2. Improving Qu Individual Consult Curriculum Review - TA Engli TF / A7053 ality of Teaching and Learni Post Open 108,000.00 99,950.00 Signed 2021-10-29 2021-10-26 2021-12-17 2022-03-07 2022-01-07 2022-03-07 2022-02-11 2022-03-11 2022-08-10 ant Selection sh for CREDD ng MOBSE/ESSP/AF/CS/C2/079 / Component 2. Improving Qu Individual Consult Curriculum Review - TA Math TF / A7053 ality of Teaching and Learni Post Open 108,000.00 107,890.00 Completed 2021-10-29 2021-10-26 2021-12-17 2022-01-17 2022-01-07 2022-02-24 2022-02-11 2022-02-25 2022-08-10 2023-06-21 ant Selection ematics for CREDD ng MOBSE/ESSP/AF/CS/C2/80 / Component 2. Improving Qu Individual Consult Curriculum Review- TA Scien TF / A7053 ality of Teaching and Learni Post Open 108,000.00 74,020.80 Completed 2021-10-29 2021-10-26 2021-12-17 2022-01-17 2022-01-07 2022-02-21 2022-02-11 2022-04-02 2022-08-10 ant Selection ce for CREDD ng MOBSE/ESSP/AF/CS/C2/81 / Component 2. Improving Qu Individual Consult Curriculum Review-TA Social TF / A7053 ality of Teaching and Learni Post Open 108,000.00 100,045.00 Completed 2021-10-29 2021-10-26 2021-12-17 2022-01-17 2022-01-07 2022-02-24 2022-02-11 2022-03-08 2022-08-10 ant Selection Studies for CREDD ng MOBSE/ESSP/CS/C2/027 / Cu Component 3. Technical and Individual Consult rriculum Review for Grades 1 IDA / D2800 Post Limited 60,000.00 0.00 Canceled 2019-07-04 2019-07-05 2019-07-09 2019-05-30 2019-07-30 2019-09-03 2020-03-01 Institutional Support ant Selection -9 for MoBSE MOBSE/ESSP/CS/C1/036 / Su Component 1. Enhancing Ac pport to PCU for supervision IDA / D2800 cess to ECD and Basic Educa Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-01-20 2020-01-30 2020-04-04 2020-10-01 of the Civil Works implement tion ation (Framework Agreement with FIOH) MOBSE/ESSP/AF/CS/084 / TA Component 2. Improving Qu Individual Consult TF / A7053 Post Open 150,000.00 72,000.00 Completed 2022-04-12 2022-04-11 2022-05-31 2022-06-27 2022-06-21 2022-08-25 2022-07-26 2022-09-11 2023-01-22 English for Gambia College ality of Teaching and Learni ant Selection ng MOBSE/ESSP/AF/CS/085 / TA Component 2. Improving Qu Individual Consult TF / A7053 Post Open 150,000.00 72,000.00 Completed 2022-04-12 2022-04-11 2022-05-31 2022-06-21 2022-06-21 2022-08-31 2022-07-26 2022-09-09 2023-01-22 Mathematics for Gambia Coll ality of Teaching and Learni ant Selection ege ng MOBSE/ESSP/AF/CS/C2/092 / SENIOR UNIVERSITY ADMINIS Component 2. Improving Qu Individual Consult TRATOR: SUPPORT FOR GAM TF / A7053 ality of Teaching and Learni Post Open 100,000.00 101,964.00 Completed 2022-04-29 2022-04-27 2022-06-17 2022-06-27 2022-07-08 2022-08-22 2022-08-12 2022-09-02 2023-02-08 ant Selection BIA COLLEGE SCHOOL OF ED ng UCATION STRATEGIC AND AD MINISTRATION PLANNING MOBSE/ESSP/AF/CS/096 / TE Component 2. Improving Qu CHNICAL ASSISTANCE FOR T Direct - Internation IDA / D2800 ality of Teaching and Learni Post Direct Selection 50,000.00 0.00 Completed 2022-09-22 2022-09-21 2022-10-02 2022-10-12 2022-12-06 2023-06-04 HE DEVELOPMENT OF NATIO al ng NAL LANGUAGES CURRICULU M IN THE GAMBIA MOBSE/ESSP/CS/C1/98 / End Component 1. Enhancing Ac Individual Consult TF / A7053 Post Limited 10,000.00 0.00 Signed 2023-05-12 2023-05-22 2023-05-17 2023-05-31 2023-06-07 2023-06-06 2023-07-12 2024-01-08 Evaluation for Region 5 Inter cess to ECD and Basic Educa ant Selection vention. tion Page 5 PROCUREMENT PLAN Project information: Colombia Multipurpose Cadaster Project Region Project P162594 Project Implementation agency: 1. “DNP" means Departamento Nacional de Planeacion , the Borrower's National Planning Department created by Law 19 of 1958 and regulated by Decree 2996 of 1968. 2. "ANT" means Agencia Nacional de Tierras, the Borrower's National Land Agency, created by Law Decree 2363 of 2015 3. "SNR" means Superintendencia de Notariado y Registro, the Borrower's Superintendent of Notaries and Registries, created by Law Decree 3346 of 1959 and regulated by Decree 1298 of 1962. 4. "IGAC" means lnstituto Geografico Agustin Codazzi, the Geographic Institute Agustin Codazzi created by Law 14 of 1983 and regulated by Decree 283 8 of 1991. Date of the Procurement Plan: 02/07/2019 Period covered by this Procurement Plan: 02/07/2019 – 08/06/2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the documents previously approved with the Bank will be used. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is not applicable; Works: Is not applicable PROCUREMENT Colombia : Multipurpose Cadaster Project PLAN General Information Country: Colombia 2019-11-26 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162594 GPN Date: 2019-09-10 Project Name: Multipurpose Cadaster Project Loan / Credit No: IBRD / 89370 National Land Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-221945-GO-RFQ / A dquisición de computadores Implementation and Mainten portátiles con su respectivo Request for Quota Single Stage - One E IBRD / 89370 ance of the Multipurpose Ca Post Open - National 15,774.65 0.00 Canceled 2021-04-05 2021-05-31 2021-11-27 morral y mouse inalámbrico tions nvelope dastre para la Subdirección de Plan eación Operativa de la Agenc ia Nacional de Tierras NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-166540-NC-DIR / Lo Implementation and Mainten Request for Quota Single Stage - One E gistica formulación POSPR - P IBRD / 89370 ance of the Multipurpose Ca Post Open - National 13,581.00 0.00 Canceled 2020-08-04 2020-09-29 2021-03-28 tions nvelope roveer servicios logísticos dastre CO-ANT-190920-NC-RFQ / A ICT Development and Streng Request for Quota Single Stage - One E dquisición de los servicios de IBRD / 89370 thening of the National Spati Post Limited 360,937.00 415,913.41 Completed 2020-09-05 2020-10-07 2020-10-31 2020-10-15 2020-12-31 2020-12-19 tions nvelope nube pública (Azure). al Data Infrastructure ICT Development and Streng CO-ANT-177691-NC-RFB / Fá Single Stage - One E IBRD / 89370 thening of the National Spati Post Request for Bids Open - National 246,824.00 0.00 Canceled 2020-08-14 2020-08-20 2020-09-17 2020-09-24 2020-10-29 2022-01-30 brica de Software nvelope al Data Infrastructure CO-ANT-203592-NC-RFQ / A ICT Development and Streng DQUISICIÓN DE SERVICIOS P Request for Quota Single Stage - One E IBRD / 89370 thening of the National Spati Post Limited 133,362.00 128,637.75 Completed 2020-11-17 2020-11-30 2020-11-20 2020-12-14 2020-11-20 2020-12-18 ARA EL DESARROLLO DE CO tions nvelope al Data Infrastructure MPONENTE BASADOS EN AR CGIS CO-ANT-211377-NC-RFB / Co ICT Development and Streng Single Stage - One E ntratación de la fábrica de so IBRD / 89370 thening of the National Spati Post Request for Bids Open - National 651,239.43 641,667.85 Completed 2021-01-28 2021-01-27 2021-02-02 2021-03-16 2021-02-25 2021-04-15 2021-03-26 2021-05-20 2021-05-20 2021-12-17 2022-01-01 nvelope ftware al Data Infrastructure CO-ANT-230987-NC-RFB / LE Implementation and Mainten Open - Internationa Single Stage - One E VANTAMIENTO CATASTRAL A IBRD / 89370 ance of the Multipurpose Ca Prior Request for Bids 6,093,050.05 0.00 Canceled 2021-06-30 2021-09-16 2021-10-29 2021-11-23 2021-12-23 2022-11-18 l nvelope NT e IGAC + Preclasificación dastre + FISO jurídico CO-ANT-260691-NC-DIR / Ad Implementation and Mainten IBRD / 89370 Post Direct Selection Direct 30,555.56 0.00 Canceled 2021-11-10 2021-11-13 2021-11-21 2021-12-31 quisición de tiquetes aéreos ance of the Multipurpose Ca dastre CO-ANT-266101-NC-RFB / O Implementation and Mainten Single Stage - One E perador BPM San Onofre, Za IBRD / 89370 ance of the Multipurpose Ca Post Request for Bids Open - National 723,388.00 0.00 Canceled 2022-04-14 2022-04-19 2022-05-31 2022-06-30 2022-08-04 2023-04-11 nvelope mbrano - BM (Preclasif+FISO) dastre CO-ANT-266286-NC-RFB / O perador BPM  Mahates, Maria Implementation and Mainten La Baja, San Juan Nepomuce Open - Internationa Single Stage - One E IBRD / 89370 ance of the Multipurpose Ca Prior Request for Bids 4,358,635.00 0.00 Canceled 2022-06-03 2022-06-08 2022-07-20 2022-08-19 2022-09-23 2023-07-20 no, Palmito y Mercaderes - B l nvelope dastre M (Sin componente económic o +preclasificación + FISO) ICT Development and Streng CO-ANT-270856-NC-DIR / Fá IBRD / 89370 thening of the National Spati Post Direct Selection Direct 584,993.00 601,073.81 Completed 2021-12-27 2021-12-27 2022-01-02 2022-01-11 2022-01-27 2022-02-08 2022-12-31 brica de Software al Data Infrastructure CO-ANT-295847-NC-RFQ / A ICT Development and Streng Request for Quota Single Stage - One E dquisición de los servicios de IBRD / 89370 thening of the National Spati Post Limited 267,094.00 219,237.32 Completed 2022-07-06 2022-07-08 2022-08-01 2022-08-06 2022-12-31 2022-09-05 tions nvelope Nube Pública (Azure) al Data Infrastructure CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-166493-CS-QCBS / S ervicio de Fábrica de Softwar ICT Development and Streng Quality And Cost- e - Gestionar el proceso de c IBRD / 89370 thening of the National Spati Post Open - National 258,065.00 0.00 Canceled 2020-05-08 2020-05-18 2020-06-05 2020-06-19 2020-07-06 2020-08-05 2020-09-02 2020-12-31 Based Selection onstrucción de software enca al Data Infrastructure minado a la actualización del sistema de información. CO-ANT-166491-CS-QCBS / F irma Consultora - Revisar y aj ustar el modelo de atención ( Quality And Cost- IBRD / 89370 Institutional Strengthening Post Open - National 293,976.00 0.00 Canceled 2020-06-30 2020-07-14 2020-07-21 2020-07-25 2020-07-31 2020-08-14 2020-10-06 2021-03-05 nacional y territorial) de la A Based Selection NT para el desarrollo de los p rocesos de ordenamiento soc ial de la propiedad. INDIVIDUAL CONSULTANTS Page 1 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CO-ANT-145491-CS-INDV / A poyo a la ANT en la planificac ión, seguimiento y monitoreo Individual Consult IBRD / 89370 Project Management Post Limited 54,194.00 44,315.86 Terminated 2019-11-29 2019-12-06 2019-12-06 2019-12-11 2019-12-20 2020-01-13 2020-01-13 2020-02-06 2020-12-30 de la ejecución del préstamo ant Selection (Especialista en planificación, seguimiento y monitoreo) CO-ANT-145497-CS-INDV / A poyo a la ANT en las activida Individual Consult des financieras necesarias pa IBRD / 89370 Project Management Post Limited 58,065.00 41,235.86 Terminated 2019-11-29 2019-12-06 2019-12-06 2019-12-11 2019-12-20 2020-01-13 2020-01-13 2020-02-06 2020-12-30 ant Selection ra la ejecución del préstamo (Especialista financiero). CO-ANT-145496-CS-INDV / A poyo a la ANT en las activida Individual Consult des de adquisiciones necesar IBRD / 89370 Project Management Post Limited 58,065.00 47,481.28 Terminated 2019-12-09 2019-12-09 2019-12-12 2019-12-11 2020-01-09 2020-01-13 2020-01-21 2020-02-06 2020-12-31 ant Selection ias para la ejecución del prés tamo (Especialista en adquisi ciones). CO-ANT-166131-CS-INDV / E Implementation and Mainten Individual Consult specialista en Salvaguardas IBRD / 89370 ance of the Multipurpose Ca Post Limited 18,290.00 5,955.87 Terminated 2020-04-03 2020-04-03 2020-04-07 2020-04-17 2020-04-13 2020-05-07 2020-04-21 2020-06-02 2020-12-18 ant Selection Ambientales dastre CO-ANT-166423-CS-CDS / Es Individual Consult pecialista en Planificación, Se IBRD / 89370 Project Management Post Limited 43,806.00 32,748.10 Completed 2020-04-02 2019-12-06 2020-04-02 2019-12-11 2020-04-02 2020-01-13 2020-04-02 2020-04-01 2020-12-30 2020-12-31 ant Selection guimiento y Monitoreo CO-ANT-166494-CS-INDV / A ICT Development and Streng Individual Consult nalista de Requerimientos y IBRD / 89370 thening of the National Spati Post Open 15,742.00 8,036.57 Completed 2020-04-06 2020-05-12 2020-04-27 2020-07-07 2020-04-29 2020-07-09 2020-05-05 2020-07-25 2020-12-18 2020-12-19 ant Selection Pruebas 1 al Data Infrastructure CO-ANT-166497-CS-INDV / A ICT Development and Streng Individual Consult nalista de Requerimientos y IBRD / 89370 thening of the National Spati Post Open 15,742.00 8,036.57 Completed 2020-04-06 2020-05-12 2020-04-27 2020-07-09 2020-04-29 2020-07-14 2020-05-05 2020-07-25 2020-12-18 2020-12-19 ant Selection Pruebas 2 al Data Infrastructure CO-ANT-166498-CS-INDV / A ICT Development and Streng Individual Consult nalista de Requerimientos y IBRD / 89370 thening of the National Spati Post Open 15,742.00 8,036.57 Completed 2020-04-06 2020-05-12 2020-04-27 2020-07-07 2020-04-29 2020-07-14 2020-05-05 2020-07-25 2020-12-18 2020-12-19 ant Selection Pruebas 3 al Data Infrastructure ICT Development and Streng CO-ANT-166499-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 16,935.00 8,284.69 Completed 2020-05-05 2020-05-12 2020-05-26 2020-07-24 2020-05-28 2020-08-14 2020-06-09 2020-08-15 2020-12-18 2020-12-19 esarrollador Senior 1 ant Selection al Data Infrastructure ICT Development and Streng CO-ANT-166502-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 16,935.00 8,284.69 Completed 2020-05-05 2020-05-12 2020-05-26 2020-07-24 2020-05-28 2020-08-14 2020-06-09 2020-08-15 2020-12-18 2020-12-19 esarrollador Senior 2 ant Selection al Data Infrastructure ICT Development and Streng CO-ANT-166503-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 16,935.00 6,008.29 Completed 2020-05-05 2020-05-12 2020-05-26 2020-08-13 2020-05-28 2020-08-27 2020-06-09 2020-09-18 2020-12-18 2020-12-19 esarrollador Senior 3 ant Selection al Data Infrastructure CO-ANT-166517-CS-INDV / P ICT Development and Streng Individual Consult rofesional Bases de Datos Se IBRD / 89370 thening of the National Spati Post Open 19,355.00 9,881.03 Completed 2020-04-06 2020-05-12 2020-04-27 2020-07-09 2020-04-29 2020-07-09 2020-05-11 2020-07-25 2020-12-18 2020-12-19 ant Selection nior 2 al Data Infrastructure CO-ANT-166834-CS-INDV / G Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 14,219.00 0.00 Canceled 2020-04-08 2020-06-11 2020-04-13 2020-06-12 2020-04-16 2020-05-05 2020-12-18 estor Territorial 1 ance of the Multipurpose Ca ant Selection dastre CO-ANT-166835-CS-INDV / T Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 11,768.00 4,277.54 Completed 2020-04-08 2020-06-11 2020-04-14 2020-06-12 2020-04-17 2020-09-11 2020-05-05 2020-09-24 2020-12-18 2020-12-19 emático Social Transversal 2 ance of the Multipurpose Ca ant Selection dastre CO-ANT-145510-CS-INDV / E Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 18,290.00 0.00 Canceled 2019-12-20 2020-03-31 2020-01-20 2020-01-31 2020-02-16 2020-12-30 specialista en Salvaguardas ance of the Multipurpose Ca ant Selection Sociales dastre CO-ANT-145508-CS-INDV / A poyo a la ANT en la coordina Individual Consult ción de gestión operativa de IBRD / 89370 Project Management Post Limited 61,935.00 0.00 Canceled 2019-11-29 2019-12-06 2019-12-20 2020-01-13 2020-12-30 ant Selection la ejecución del préstamo (C oordinador de gestión operat iva de proyecto-ANT). CO-ANT-145501-CS-INDV / A poyo a la ANT en la gestión d Individual Consult e operaciones monetarias de IBRD / 89370 Project Management Post Limited 15,242.00 0.00 Canceled 2019-12-16 2020-01-17 2020-01-31 2020-02-16 2020-12-30 ant Selection la ejecución del préstamo (Pr ofesional de tesorería). CO-ANT-145500-CS-INDV / A poyo a la ANT en la gestión c Individual Consult IBRD / 89370 Project Management Post Limited 15,242.00 0.00 Canceled 2019-12-16 2020-01-17 2020-01-31 2020-02-16 2020-12-30 ontable de la ejecución del pr ant Selection éstamo (Profesional contable ). CO-ANT-166531-CS-INDV / E Individual Consult specialista de Adquisiciones - IBRD / 89370 Project Management Post Direct 44,694.00 34,762.03 Completed 2020-04-08 2020-04-14 2020-04-14 2020-04-21 2020-04-16 2020-04-22 2020-04-20 2020-05-08 2020-12-30 2020-12-31 ant Selection Bertha Lucía Cordero Otero CO-ANT-174190-CS-CDS / Es pecialista Financiero - Germá IBRD / 89370 Project Management Post Direct Selection Direct 32,941.00 26,475.68 Completed 2020-05-20 2020-05-20 2020-05-22 2020-05-21 2020-05-27 2020-06-02 2020-12-30 2020-12-31 n Jiménez CO-ANT-174397-CS-INDV / T Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 14,344.00 5,482.45 Completed 2020-05-21 2020-06-11 2020-05-24 2020-06-12 2020-05-26 2020-09-11 2020-06-01 2020-09-19 2020-12-18 2020-12-19 emático Jurídico ance of the Multipurpose Ca ant Selection dastre CO-ANT-174404-CS-INDV / T Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 13,933.00 4,559.33 Completed 2020-05-21 2020-06-11 2020-05-24 2020-06-12 2020-05-26 2020-09-25 2020-06-01 2020-10-03 2020-12-18 2020-12-19 emático Ordenamiento Territ ance of the Multipurpose Ca ant Selection orial dastre CO-ANT-166532-CS-INDV / E Individual Consult specialista Financiero - Mario IBRD / 89370 Project Management Post Direct 38,387.00 0.00 Canceled 2020-04-08 2020-04-14 2020-04-14 2020-04-22 2020-04-16 2020-04-20 2020-12-30 ant Selection de Milleri Bonilla CO-ANT-166535-CS-INDV / T Implementation and Mainten Individual Consult emático Catastral 1 - Juan Ca IBRD / 89370 ance of the Multipurpose Ca Post Direct 14,258.00 12,349.95 Completed 2020-06-09 2020-06-09 2020-06-10 2020-06-10 2020-06-10 2020-06-10 2020-06-12 2020-06-20 2020-12-18 2020-12-19 ant Selection rlos Fajardo dastre Page 2 CO-ANT-145503-CS-INDV / A poyo a la ANT en la coordina Implementation and Mainten Individual Consult ción técnica de la ejecución d IBRD / 89370 ance of the Multipurpose Ca Post Limited 38,387.00 0.00 Canceled 2020-06-30 2020-07-07 2020-07-21 2020-08-14 2021-08-01 ant Selection el préstamo (Coordinador téc dastre nico del proyecto-ANT). CO-ANT-181975-CS-INDV / C Individual Consult oordinador de Gestión Opera IBRD / 89370 Project Management Post Direct 27,353.00 20,060.67 Completed 2020-07-31 2020-07-24 2020-08-02 2020-07-21 2020-08-03 2020-07-22 2020-08-25 2020-08-05 2020-12-30 2020-12-31 ant Selection tiva - Karen Godoy CO-ANT-181974-CS-INDV / C Implementation and Mainten Individual Consult oordinador Técnico del Proye IBRD / 89370 ance of the Multipurpose Ca Post Direct 28,765.00 21,155.17 Completed 2020-07-31 2020-07-24 2020-08-02 2020-07-21 2020-08-03 2020-07-21 2020-08-25 2020-08-06 2020-12-30 2020-12-31 ant Selection cto - Juan Rodrigo Higuera dastre CO-ANT-145510-CS-INDV-2 / Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 12,353.00 5,884.82 Completed 2020-07-31 2020-07-24 2020-08-31 2020-07-28 2020-09-11 2020-07-30 2020-09-27 2020-09-17 2020-12-30 2020-12-19 Consultor Salvaguardas Soci ance of the Multipurpose Ca ant Selection ales dastre CO-ANT-177458-CS-INDV / P Implementation and Mainten Individual Consult rofesional Senior de la Direcc IBRD / 89370 ance of the Multipurpose Ca Post Limited 14,824.00 0.00 Canceled 2020-07-31 2020-08-05 2020-08-07 2020-08-28 2021-02-14 ant Selection ión de Gestión Jurídica de Tie dastre rras CO-ANT-177456-CS-INDV / G ICT Development and Streng Individual Consult estor de proyecto para el co IBRD / 89370 thening of the National Spati Post Limited 14,706.00 8,832.59 Completed 2020-06-29 2020-07-24 2020-07-04 2020-08-03 2020-07-06 2020-09-10 2020-08-03 2020-09-19 2020-12-18 2020-12-31 ant Selection mponente tecnológico al Data Infrastructure CO-ANT-185312-CS-INDV / A poyar a la ANT, como Gestor Territorial en la formulación Implementation and Mainten Individual Consult de POSPR contribuyendo en IBRD / 89370 ance of the Multipurpose Ca Post Limited 8,529.00 3,585.82 Completed 2020-07-26 2020-07-24 2020-07-27 2020-07-28 2020-08-17 2020-10-01 2020-08-29 2020-10-09 2020-12-18 2020-12-19 ant Selection el análisis territorial mediant dastre e el establecimiento de un di álogo institucional y comunit ario en los municipios focaliz ados CO-ANT-166518-CS-INDV / P ICT Development and Streng Individual Consult rofesional Bases de Datos Se IBRD / 89370 thening of the National Spati Post Open 19,355.00 0.00 Canceled 2020-04-06 2020-05-12 2020-04-27 2020-04-29 2020-05-11 2020-12-18 ant Selection nior 1 al Data Infrastructure ICT Development and Streng CO-ANT-166511-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 13,774.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-21 2020-05-28 2020-06-09 2020-12-18 esarrollador Junior 1 ant Selection al Data Infrastructure ICT Development and Streng CO-ANT-166512-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 13,774.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-21 2020-05-28 2020-06-02 2020-12-18 esarrollador Junior 2 ant Selection al Data Infrastructure ICT Development and Streng CO-ANT-166510-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 16,935.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 esarrollador Senior 7 ant Selection al Data Infrastructure ICT Development and Streng CO-ANT-166509-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 16,935.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 esarrollador Senior 6 ant Selection al Data Infrastructure ICT Development and Streng CO-ANT-166508-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 16,935.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 esarrollador Senior 5 ant Selection al Data Infrastructure ICT Development and Streng CO-ANT-166506-CS-INDV / D Individual Consult IBRD / 89370 thening of the National Spati Post Open 16,935.00 0.00 Canceled 2020-05-05 2020-05-12 2020-05-26 2020-07-23 2020-05-28 2020-06-09 2020-12-18 esarrollador Senior 4 ant Selection al Data Infrastructure CO-ANT-189894-CS-INDV / A poyar a la Agencia Nacional de Tierras (ANT) como Especi alista de Salvaguardas Ambie Implementation and Mainten Individual Consult ntales de las actividades pre IBRD / 89370 ance of the Multipurpose Ca Post Direct 6,862.75 5,182.45 Completed 2020-08-24 2020-08-28 2020-08-29 2020-04-17 2020-09-04 2020-09-18 2020-09-09 2020-09-25 2020-12-18 2020-12-19 ant Selection vistas para los componentes dastre y subcomponentes del Proye cto denominado “Programa p ara la adopción e implement ación de un Catastro Multipro pósit CO-ANT-190917-CS-INDV / D ICT Development and Streng Individual Consult esarrollador Senior - Leonard IBRD / 89370 thening of the National Spati Post Direct 7,941.18 5,422.20 Completed 2020-08-31 2020-09-02 2020-09-10 2020-09-28 2020-09-10 2020-09-15 2020-09-10 2020-09-26 2020-12-18 2020-12-19 ant Selection Alfonso Rozo Hartley al Data Infrastructure CO-ANT-190919-CS-INDV / D ICT Development and Streng Individual Consult esarrollador Senior - Wilson A IBRD / 89370 thening of the National Spati Post Direct 7,941.18 0.00 Canceled 2020-08-31 2020-09-02 2020-09-10 2020-09-10 2020-09-10 2020-12-18 ant Selection lberto Guasca Rojas al Data Infrastructure CO-ANT-191651-CS-INDV / P ICT Development and Streng Individual Consult rofesional Bases de Datos Se IBRD / 89370 thening of the National Spati Post Direct 7,942.00 5,402.46 Completed 2020-09-10 2020-09-07 2020-09-10 2020-09-03 2020-09-15 2020-09-18 2020-09-18 2020-09-26 2020-12-18 2020-12-19 ant Selection nior - Nelson Ricardo Restre al Data Infrastructure po Ramírez CO-ANT-195908-CS-INDV / P Implementation and Mainten rofesional Senior de la Direcc Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct 14,824.00 4,908.71 Completed 2020-09-28 2020-09-25 2020-09-29 2020-09-29 2020-09-29 2020-10-01 2020-10-01 2020-10-17 2020-12-18 2020-12-19 ión de Gestión Jurídica de Tie ant Selection dastre rras - Miguel Andrés Martínez Toro CO-ANT-196375-CS-INDV / D ICT Development and Streng Individual Consult esarrolladora Senior - Rosa P IBRD / 89370 thening of the National Spati Post Direct 5,736.00 3,979.67 Completed 2020-09-30 2020-09-25 2020-09-30 2020-09-25 2020-10-07 2020-10-14 2020-10-12 2020-10-30 2020-12-18 2020-12-19 ant Selection atricia García Polo al Data Infrastructure CO-ANT-196376-CS-INDV / D ICT Development and Streng Individual Consult esarrolladora Senior - Elsa Vi IBRD / 89370 thening of the National Spati Post Direct 5,736.00 3,856.24 Completed 2020-09-30 2020-09-25 2020-09-30 2020-09-25 2020-10-07 2020-10-07 2020-10-12 2020-10-21 2020-12-18 2020-12-19 ant Selection viana López Charry al Data Infrastructure CO-ANT-190918-CS-INDV / D ICT Development and Streng Individual Consult esarrollador Senior - William J IBRD / 89370 thening of the National Spati Post Direct 7,941.18 0.00 Canceled 2020-08-31 2020-09-02 2020-09-10 2020-08-28 2020-09-10 2020-09-10 2020-12-18 ant Selection avier Barreto Parra al Data Infrastructure CO-ANT-198876-CS-INDV / D ICT Development and Streng Individual Consult esarrollador Senior - John Jair IBRD / 89370 thening of the National Spati Post Direct 3,530.00 2,607.37 Completed 2020-10-13 2020-10-15 2020-10-13 2020-10-16 2020-10-27 2020-10-23 2020-11-09 2020-11-12 2020-12-18 2020-12-19 ant Selection o Betancourt Arango al Data Infrastructure CO-ANT-191648-CS-INDV / P ICT Development and Streng Individual Consult rofesional Bases de Datos Se IBRD / 89370 thening of the National Spati Post Direct 7,942.00 0.00 Canceled 2020-09-10 2020-09-07 2020-09-10 2020-09-15 2020-09-18 2020-12-18 ant Selection nior - John Jairo Moreno Bohó al Data Infrastructure rquez - CO-ANT-201300-CS-INDV / D ICT Development and Streng Individual Consult esarrollador Junior - Miguel A IBRD / 89370 thening of the National Spati Post Direct 2,871.00 0.00 Canceled 2020-10-26 2020-10-26 2020-10-27 2020-10-30 2020-11-05 2020-12-18 ant Selection ntonio Posada Osorio al Data Infrastructure Page 3 CO-ANT-177457-CS-INDV / P Implementation and Mainten Individual Consult rofesional Senior de la Direcc IBRD / 89370 ance of the Multipurpose Ca Post Limited 14,824.00 0.00 Canceled 2020-07-31 2020-10-26 2020-08-05 2020-08-07 2020-08-28 2021-01-26 ant Selection ión de Acceso a Tierras dastre CO-ANT-177460-CS-INDV / P Implementation and Mainten Individual Consult rofesional Senior de contrato IBRD / 89370 ance of the Multipurpose Ca Post Limited 14,824.00 0.00 Canceled 2020-07-31 2020-10-26 2020-08-05 2020-08-07 2020-08-28 2021-02-14 ant Selection s de uso de la Dirección de A dastre cceso a Tierras CO-ANT-145499-CS-INDV / P Individual Consult IBRD / 89370 Project Management Post Limited 12,135.00 0.00 Canceled 2020-07-31 2020-09-16 2020-09-01 2020-09-22 2020-10-08 2021-08-21 rofesional Financiero ant Selection CO-ANT-210868-CS-INDV / P Individual Consult IBRD / 89370 Project Management Post Limited 17,034.17 16,930.15 Completed 2020-12-24 2020-12-23 2021-01-20 2021-01-22 2021-02-06 2021-02-02 2021-02-16 2021-02-20 2021-12-24 2021-12-25 rofesional de apoyo financier ant Selection o CO-ANT-210869-CS-INDV / P Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 26,896.06 25,525.91 Completed 2020-12-24 2020-12-23 2021-01-20 2021-02-08 2021-02-06 2021-02-08 2021-02-16 2021-03-06 2021-12-24 2021-12-25 rofesional Senior DAT Contra ance of the Multipurpose Ca ant Selection tos de Uso dastre CO-ANT-210870-CS-INDV / P Implementation and Mainten Individual Consult rofesional Senior DAT Adjudic IBRD / 89370 ance of the Multipurpose Ca Post Limited 26,896.06 25,525.91 Completed 2020-12-24 2020-12-23 2021-01-20 2021-02-08 2021-02-06 2021-02-08 2021-02-16 2021-03-06 2021-12-24 2021-12-25 ant Selection ación de Baldíos dastre CO-ANT-210871-CS-INDV / P Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 17,930.70 17,046.95 Completed 2020-12-24 2020-12-23 2021-01-20 2021-02-08 2021-02-06 2021-02-08 2021-02-16 2021-03-06 2021-12-24 2021-12-25 rofesional Junior DAT ance of the Multipurpose Ca ant Selection dastre CO-ANT-207581-CS-INDV / E Individual Consult specialista Financiero del Pro IBRD / 89370 Project Management Post Direct 46,848.08 47,968.99 Completed 2020-12-24 2020-12-23 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-01-18 2021-01-21 2021-12-24 2021-12-28 ant Selection yecto - Germán Jiménez - Re contratación CO-ANT-207579-CS-INDV / E specialista Planeación Monito Individual Consult IBRD / 89370 Project Management Post Direct 46,848.08 47,968.99 Completed 2020-12-24 2020-12-23 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-01-18 2021-01-21 2021-12-24 2021-12-28 reo y Seguimiento - Paola Go ant Selection nzález - Recontratación CO-ANT-207577-CS-INDV / C Implementation and Mainten Individual Consult oordinador Técnico - Juan Ro IBRD / 89370 ance of the Multipurpose Ca Post Direct 52,955.87 54,222.92 Completed 2020-12-24 2020-12-23 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-01-18 2021-01-21 2021-12-24 2021-12-28 ant Selection drigo Higuera - Recontratació dastre n CO-ANT-207575-CS-INDV / G ICT Development and Streng estor de Proyecto Fortalecimi Individual Consult IBRD / 89370 thening of the National Spati Post Direct 32,882.63 32,831.25 Completed 2020-12-24 2020-12-23 2021-01-18 2021-01-21 2021-01-18 2021-01-27 2021-01-24 2021-01-28 2021-12-24 2021-12-28 ento Tecnológico - Luz Adrian ant Selection al Data Infrastructure a García Arce - Recontratació n CO-ANT-207583-CS-INDV / P rofesional Senior de la Direcc Implementation and Mainten Individual Consult ión de Gestión Jurídica de Tie IBRD / 89370 ance of the Multipurpose Ca Post Direct 29,768.45 29,721.94 Completed 2020-12-24 2020-12-23 2021-01-18 2021-01-27 2021-01-18 2021-01-27 2021-01-18 2021-01-28 2021-12-24 2021-12-25 ant Selection rras DGJT - Miguel Andrés Ma dastre rtínez Toro - Recontratación CO-ANT-207578-CS-INDV / C oordinadora de Gestión Oper Individual Consult IBRD / 89370 Project Management Post Direct 51,867.51 53,108.52 Completed 2020-12-24 2020-12-23 2021-01-18 2021-01-20 2021-01-18 2021-01-20 2021-01-18 2021-01-25 2021-12-24 ativa - Karen Godoy Caicedo ant Selection - Recontratación CO-ANT-207582-CS-INDV / E Individual Consult specialista en Adquisiciones - IBRD / 89370 Project Management Post Direct 52,955.87 54,596.86 Completed 2020-12-24 2020-12-23 2021-01-18 2021-01-19 2021-01-18 2021-01-19 2021-01-18 2021-01-20 2021-12-24 2022-01-01 ant Selection Bertha Lucía Cordero - Recon tratación CO-ANT-215922-CS-INDV / T emático Catastral Juan Carlos Fajardo - Recontratación 202 Implementation and Mainten 1. Apoyar a la Agencia Nacio Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct 15,983.13 18,488.88 Completed 2021-02-12 2021-02-08 2021-02-15 2021-01-25 2021-02-15 2021-02-15 2021-02-22 2021-02-20 2021-09-30 2021-11-16 nal de Tierras (ANT), como T ant Selection dastre emático Catastral, en la form ulación de Planes de Ordena miento Social de la Propieda d Rural (POSPR) CO-ANT-215929-CS-INDV / T emático Social, recontratació n 2021 Diana Castro - Apoyar Implementation and Mainten Individual Consult a la Agencia Nacional de Tier IBRD / 89370 ance of the Multipurpose Ca Post Direct 12,621.13 12,544.06 Completed 2021-02-12 2021-02-08 2021-02-15 2021-01-25 2021-02-15 2021-02-19 2021-02-22 2021-02-20 2021-09-30 2021-04-07 ant Selection ras (ANT), como Temático So dastre cial en la formulación de Plan es de Ordenamiento Social d e la Propiedad Rural (POSPR) CO-ANT-216796-CS-INDV / T emático Jurídico CD Claudia E scorcia. Apoyar a la Agencia Implementation and Mainten Individual Consult Nacional de Tierras (ANT), co IBRD / 89370 ance of the Multipurpose Ca Post Direct 15,232.39 17,127.41 Completed 2021-02-12 2021-02-08 2021-02-16 2021-02-02 2021-02-16 2021-02-24 2021-02-22 2021-02-25 2021-10-06 2021-11-16 ant Selection mo Temático Jurídico en la fo dastre rmulación de Planes de Orde namiento Social de la Propie dad Rural (POSPR) CO-ANT-217729-CS-INDV / T Implementation and Mainten Individual Consult emático de Ordenamiento Te IBRD / 89370 ance of the Multipurpose Ca Post Limited 15,783.66 0.00 Canceled 2021-02-18 2021-02-08 2021-02-21 2021-02-23 2021-03-01 2021-10-30 ant Selection rritorial Competitivo 2021 dastre CO-ANT-221938-CS-INDV / G Implementation and Mainten Individual Consult estor territorial por recontrat IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,747.75 8,725.69 Completed 2021-03-05 2021-03-01 2021-03-05 2021-03-03 2021-03-05 2021-03-12 2021-03-08 2021-03-16 2021-09-07 2021-09-15 ant Selection ación Felenix Serpa dastre CO-ANT-221941-CS-INDV / G Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 8,747.75 8,557.07 Completed 2021-03-11 2021-03-01 2021-03-15 2021-03-03 2021-03-19 2021-03-03 2021-04-01 2021-04-10 2021-09-28 2021-05-07 estor Territorial Competitivo ance of the Multipurpose Ca ant Selection dastre CO-ANT-221943-CS-INDV / G Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 8,747.75 10,179.81 Completed 2021-03-11 2021-03-01 2021-03-15 2021-03-03 2021-03-19 2021-03-03 2021-04-01 2021-04-10 2021-09-28 2021-11-16 estor Territorial competitivo ance of the Multipurpose Ca ant Selection dastre CO-ANT-230189-CS-INDV / T Implementation and Mainten emático de Ordenamiento Te Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Limited 13,618.88 10,335.07 Completed 2021-04-26 2021-04-28 2021-05-03 2021-05-06 2021-05-21 2021-07-14 2021-05-28 2021-07-16 2021-12-24 2021-12-25 rritorial esta linea reemplaza ant Selection dastre la que se cancela por cambi o de perfil en los TDR CO-ANT-230190-CS-INDV / T Implementation and Mainten Individual Consult IBRD / 89370 Post Limited 9,680.09 9,694.81 Completed 2021-04-26 2021-04-28 2021-05-03 2021-05-10 2021-05-21 2021-05-19 2021-05-28 2021-06-02 2021-11-24 2021-07-10 emático Social Competitivo 2 ance of the Multipurpose Ca ant Selection 021 dastre CO-ANT-236626-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 3,785.64 3,601.55 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-09-09 2021-09-01 ant Selection io 2. Juan Carlos García Baró dastre n CO-ANT-236628-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 3,785.64 3,601.55 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-09-09 2021-09-18 ant Selection io 2. Adriana Constanza Fajar dastre do Aguirre Page 4 CO-ANT-236629-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,606.89 2,480.12 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-09-09 2021-09-18 ant Selection io 3. Omar Jeisson Bravo dastre CO-ANT-236631-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,606.89 2,480.12 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-09-09 2021-09-18 ant Selection io 3. LAURA MILENA AVENDA dastre ÑO BAUTISTA CO-ANT-236632-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,606.89 2,480.12 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-09-09 2021-09-18 ant Selection io 3. ORLANDO PEÑA MARTIN dastre EZ CO-ANT-236633-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,606.89 2,419.97 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-10 2021-06-11 2021-06-25 2021-09-09 2021-09-24 ant Selection io 3. MARTHA YANETH RODRI dastre GUEZ MELO CO-ANT-236638-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico especializa IBRD / 89370 ance of the Multipurpose Ca Post Direct 13,484.42 13,018.02 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-20 2021-12-08 2021-12-31 ant Selection do. NELSON ENRIQUE DAZA L dastre ADINO CO-ANT-236640-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico especializa IBRD / 89370 ance of the Multipurpose Ca Post Direct 13,484.42 13,018.02 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-18 ant Selection do. ANTONIO DAVID ROYET D dastre IAZ CO-ANT-236641-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-12-08 2021-12-16 ant Selection io 1. NELSON VESGA TERRAZ dastre A CO-ANT-236643-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-12-08 2021-12-16 ant Selection io 1. ANA DUBIEY MONTAÑA dastre ROSAS CO-ANT-236645-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-12-08 2021-12-16 ant Selection io 1. GINA MARCELA MESTRE dastre DURAN CO-ANT-236647-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-20 2021-12-08 2021-12-25 ant Selection io 1. LUZ MARY MARTINEZ G dastre ALINDO CO-ANT-236648-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-20 2021-12-08 2021-12-25 ant Selection io 1. CLAUDIA VANESSA REN dastre GIFO ZUÑIGA CO-ANT-236649-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-20 2021-12-08 2021-12-25 ant Selection io 1. LAURA ANGELICA BAUTI dastre STA BARON CO-ANT-236650-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-20 2021-12-08 2021-12-25 ant Selection io 1. MAOMAR MONTES MER dastre CADO CO-ANT-236651-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,327.89 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-09-25 ant Selection io 1. MARIA TERESA GONZAL dastre EZ VERGARA CO-ANT-236652-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,327.89 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-18 ant Selection io 1. BRAYAN FELIPE RIVERA dastre TAPIAS CO-ANT-236653-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-12-08 2021-12-18 ant Selection io 1. NANCY ROCIO LOPEZ M dastre ESA CO-ANT-236655-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,327.89 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-18 ant Selection io 1. JESUS DAVID PACHECO dastre SARMIENTO CO-ANT-236657-CS-INDV / P Implementation and Mainten rofesional Catastral Especiali Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct 13,484.42 13,018.02 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-18 zado. NUBIA ALEXANDRA BO ant Selection dastre HORQUEZ CASTILLO CO-ANT-236659-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Especiali IBRD / 89370 ance of the Multipurpose Ca Post Direct 13,484.42 12,828.70 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-12-08 2021-12-16 ant Selection zado. BRYAN FABIAN BONILL dastre A SANCHEZ CO-ANT-236661-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-12-08 2021-12-16 ant Selection ario. NURY GONZALEZ AVILA dastre CO-ANT-236663-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-19 2021-12-08 2021-12-16 ant Selection ario. LEIDY ANDREA RAMOS dastre QUIVANO CO-ANT-236669-CS-INDV / P Implementation and Mainten rofesional Catastral Universit Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-15 ario. ANDRES MAURICIO ART ant Selection dastre UNDUAGA SANTOS CO-ANT-236670-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-15 ant Selection ario. CESAR AUGUSTO SANC dastre HEZ BARRERO CO-ANT-236672-CS-INDV / P Implementation and Mainten rofesional Catastral Universit Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-15 ario. WILSON OSWALDO RA ant Selection dastre MOS TOCARRUNCHO CO-ANT-236675-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 8,206.77 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-15 ant Selection ario. LEIDY KATHERINE SÁNC dastre HEZ CO-ANT-236678-CS-INDV / G Implementation and Mainten Individual Consult estor Documental - JAIR ALF IBRD / 89370 ance of the Multipurpose Ca Post Direct 5,484.75 5,218.04 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-06-11 2021-06-11 2021-06-17 2021-12-08 2021-12-14 ant Selection REDO PEÑALOZA PEÑALOZA dastre Page 5 CO-ANT-236681-CS-INDV / A Implementation and Mainten Individual Consult uxiliar Administrativo DGJT- IBRD / 89370 ance of the Multipurpose Ca Post Direct 1,854.89 1,749.13 Completed 2021-05-31 2021-05-31 2021-06-06 2021-06-03 2021-06-07 2021-07-01 2021-06-11 2021-07-05 2021-09-09 2022-01-29 ant Selection MARÍA JOSÉ DÍAZ dastre CO-ANT-236889-CS-INDV / P Individual Consult IBRD / 89370 Project Management Post Limited 10,274.25 5,386.17 Completed 2021-06-05 2021-05-31 2021-06-10 2021-06-24 2021-06-20 2021-06-24 2021-06-22 2021-09-11 2021-12-24 2021-11-22 rofesional de Apoyo PMS ant Selection CO-ANT-236894-CS-INDV / P Individual Consult rofesional de Apoyo en Adqui IBRD / 89370 Project Management Post Limited 10,274.25 5,012.32 Completed 2021-06-04 2021-05-31 2021-06-09 2021-08-19 2021-06-19 2021-08-19 2021-06-22 2021-09-23 2021-12-24 2022-01-01 ant Selection siciones Competitivo CO-ANT-239710-CS-INDV / G estor Territorial (Reemplazo Implementation and Mainten de Catherine Ruiz Chacón). A Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Limited 7,188.54 6,218.84 Completed 2021-07-15 2021-07-15 2021-07-17 2021-06-13 2021-07-20 2021-06-13 2021-07-25 2021-08-06 2021-12-22 2021-12-25 dquisición relacionada con C ant Selection dastre O-ANT-221941-CS-INDV. Seg undo en orden de elegibilida d proceso competitivo. CO-ANT-236623-CS-INDV / A Implementation and Mainten Individual Consult uxiliar Administrativo DAT . I IBRD / 89370 ance of the Multipurpose Ca Post Direct 1,854.89 0.00 Canceled 2021-05-31 2021-05-31 2021-06-06 2021-06-07 2021-06-11 2021-09-09 ant Selection vonne Alejandra López Asenc dastre io CO-ANT-236682-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 5,750.83 0.00 Canceled 2021-05-31 2021-05-31 2021-06-06 2021-06-08 2021-06-07 2021-06-11 2021-10-09 ant Selection ario. LIZ YORLENY RODRIGUE dastre Z GOMEZ CO-ANT-236665-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 0.00 Canceled 2021-05-31 2021-05-31 2021-06-06 2021-06-04 2021-06-07 2021-06-11 2021-12-08 ant Selection ario. NERY CATALINA VASQU dastre EZ CASTRO CO-ANT-242733-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,626.25 6,276.77 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-12-24 2021-12-25 ant Selection ario. Luis Darío Castro Pedroz dastre o. CO-ANT-242734-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 5,750.83 6,165.81 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-11-27 2021-12-25 ant Selection ario. Luis Carlos Fernández G dastre ordillo. CO-ANT-242735-CS-INDV / G Implementation and Mainten Individual Consult estor Documental. Sandra Lili IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,570.62 0.00 Canceled 2021-07-15 2021-07-15 2021-07-19 2021-07-23 2021-07-30 2021-12-24 ant Selection ana Salamanca Parra dastre CO-ANT-242736-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 6,276.77 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-12-24 2021-12-25 ant Selection io 1 DAT. Juan Sebastián Gar dastre zón Verano. CO-ANT-242737-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 6,276.77 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-07-31 2021-12-24 2021-12-25 ant Selection io 1 DAT. Carolina Rivera Daz dastre a. CO-ANT-242738-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 6,384.32 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-07-31 2021-12-24 2021-12-25 ant Selection io 1. Heidy Tatiana Gómez M dastre olina CO-ANT-242739-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,172.41 2,003.74 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-10-13 2021-10-20 ant Selection io 3. Zulma Esperanza Mejía dastre Alfonso. CO-ANT-242740-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,172.41 2,003.74 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-10-13 2021-10-20 ant Selection io 3. Jessika Nathalia Castella dastre nos Vega. CO-ANT-242741-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,172.41 2,003.74 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-10-13 2021-10-20 ant Selection io 3. Kathy Stefany Ramos Pe dastre ña. CO-ANT-242742-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,606.89 0.00 Canceled 2021-07-15 2021-07-15 2021-07-19 2021-07-23 2021-07-30 2021-10-28 ant Selection io 3. Ana Milena Pinzón Pinzó dastre n. CO-ANT-242904-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Especiali IBRD / 89370 ance of the Multipurpose Ca Post Direct 11,237.01 8,712.95 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-06 2021-12-24 2021-12-25 ant Selection zado. Carlos Humberto Arias dastre Duarte. CO-ANT-242905-CS-INDV / P Implementation and Mainten Individual Consult rofesional Historiador Especi IBRD / 89370 ance of the Multipurpose Ca Post Direct 6,742.20 6,218.72 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-10-28 2021-11-03 ant Selection alizado. Fernando Humberto dastre Mayorga García. CO-ANT-242906-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Especializa IBRD / 89370 ance of the Multipurpose Ca Post Direct 11,237.01 9,811.75 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-12-24 2021-12-25 ant Selection do. Sandra Bibiana Flautero P dastre eña. CO-ANT-242907-CS-INDV / P Implementation and Mainten Individual Consult rofesional SIG Especializado. IBRD / 89370 ance of the Multipurpose Ca Post Direct 11,237.01 9,811.75 Completed 2021-07-15 2021-07-15 2021-07-19 2021-07-16 2021-07-23 2021-07-22 2021-07-30 2021-08-04 2021-12-24 2021-12-25 ant Selection Camilo Alberto Artunduaga S dastre antos. CO-ANT-244367-CS-INDV / T emático social. María Camila Sandoval. Ocupó segundo lu Implementation and Mainten Individual Consult gar en orden de elegibilidad IBRD / 89370 ance of the Multipurpose Ca Post Limited 7,522.80 0.00 Canceled 2021-07-23 2021-07-26 2021-07-26 2021-08-04 2021-08-13 2021-12-24 ant Selection en proceso CO-ANT-230190- dastre CS-INDV. Reemplaza a Diego Fidel Quiroga quien terminó anticipadamente su contrato. CO-ANT-244590-CS-INDV / A Implementation and Mainten Individual Consult uxiliar Administrativo - Neilan IBRD / 89370 ance of the Multipurpose Ca Post Direct 1,854.89 1,726.49 Completed 2021-07-26 2021-07-26 2021-07-30 2021-07-28 2021-08-03 2021-07-28 2021-08-10 2021-08-24 2021-11-08 2021-11-22 ant Selection Jeanneth Paez dastre CO-ANT-244592-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 0.00 Canceled 2021-07-26 2021-07-26 2021-07-30 2021-08-03 2021-08-10 2021-12-24 ant Selection ario - Duberney Martin Herre dastre ño CO-ANT-244593-CS-INDV / P Implementation and Mainten Individual Consult ROFESIONAL CATASTRAL - JU IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 5,441.97 Completed 2021-07-26 2021-07-26 2021-07-30 2021-07-28 2021-08-03 2021-07-28 2021-08-10 2021-08-24 2021-12-24 2021-12-25 ant Selection LIO HERNAN DURAN RODRIG dastre UEZ CO-ANT-244595-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 5,441.97 Completed 2021-07-26 2021-07-26 2021-07-30 2021-07-28 2021-08-03 2021-07-28 2021-08-10 2021-08-24 2021-12-24 2021-12-25 ant Selection io 1 DAT - Yasmin Sanchez A dastre gudelo Page 6 CO-ANT-244596-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 0.00 Canceled 2021-07-26 2021-07-28 2021-07-30 2021-08-03 2021-08-10 2021-12-24 ant Selection io 1 DAT - Edgardo Segundo dastre Arrieta Diaz CO-ANT-244597-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 5,441.97 Completed 2021-07-26 2021-07-26 2021-07-30 2021-07-28 2021-08-03 2021-07-28 2021-08-10 2021-08-24 2021-12-24 2021-12-25 ant Selection io 1 - Alejandro Jose Escamill dastre a Soto CO-ANT-244598-CS-INDV / P Implementation and Mainten Individual Consult rofesional en sistemas - Mab IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 0.00 Canceled 2021-07-26 2021-07-26 2021-07-30 2021-08-03 2021-08-10 2021-12-24 ant Selection el Rocio Bravo León dastre CO-ANT-242744-CS-INDV / C oordinador Gestión Operativa Individual Consult IBRD / 89370 Project Management Post Direct 22,173.61 18,975.46 Completed 2021-07-26 2021-07-26 2021-07-30 2021-07-28 2021-08-03 2021-07-28 2021-08-10 2021-08-12 2021-12-27 2021-12-28 . Reemplaza a Karen Godoy, ant Selection quien terminó contrato antici padamente. CO-ANT-246645-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 6,690.95 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-09 2021-08-24 2021-08-21 2021-12-24 2021-12-25 ant Selection ario - Camilo Santiago Salced dastre o Patarroyo CO-ANT-246646-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 5,116.98 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-09 2021-08-24 2021-09-02 2021-12-24 2021-12-25 ant Selection ario - Joan Andres Alvarado O dastre rdoñez CO-ANT-246647-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,606.89 2,426.44 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-09 2021-08-24 2021-08-27 2021-11-22 2021-11-26 ant Selection io 3 - Ana Anyi Dayana Garcí dastre a Millán CO-ANT-246648-CS-INDV / G Implementation and Mainten Individual Consult estor Documental - Nelson O IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,570.62 3,025.17 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-09 2021-08-24 2021-09-10 2021-12-24 2021-12-25 ant Selection swaldo Rodriguez Chaparro dastre CO-ANT-246717-CS-INDV / P Implementation and Mainten Individual Consult rofesional Agronómico - Jose IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 5,386.30 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-09 2021-08-24 2021-08-22 2021-12-24 2021-12-25 ant Selection Miguel Payares dastre CO-ANT-246718-CS-INDV / P Implementation and Mainten Individual Consult rofesional Agronómico Especi IBRD / 89370 ance of the Multipurpose Ca Post Direct 11,237.01 8,297.62 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-05 2021-08-24 2021-08-27 2021-12-24 2021-12-25 ant Selection alizado - Jorge Luis Cabrales dastre CO-ANT-246719-CS-INDV / P Implementation and Mainten Individual Consult rofesional social universitario IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 5,397.37 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-09 2021-08-24 2021-08-25 2021-12-24 2021-12-25 ant Selection - Ana Catalina Salazar Silva dastre CO-ANT-246720-CS-INDV / P Implementation and Mainten Individual Consult rofesional Social Universitari IBRD / 89370 ance of the Multipurpose Ca Post Direct 7,188.54 5,308.15 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-05 2021-08-24 2021-08-27 2021-12-24 2021-12-25 ant Selection o - Irina Isabel Alvarez Correa dastre CO-ANT-246736-CS-INDV / G Implementation and Mainten Individual Consult estor Documental - Elsa Yura IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,570.62 3,253.49 Completed 2021-08-09 2021-08-05 2021-08-13 2021-08-05 2021-08-17 2021-08-09 2021-08-24 2021-09-02 2021-12-24 2021-12-25 ant Selection ni Rodriguez dastre CO-ANT-249829-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 5,750.83 4,496.00 Completed 2021-08-30 2021-09-07 2021-09-03 2021-09-10 2021-09-07 2021-09-13 2021-09-14 2021-09-16 2021-12-24 2021-12-25 ant Selection io 1 - SULMA JUDITH RAMOS dastre FAYAD CO-ANT-253043-CS-INDV / P Implementation and Mainten Individual Consult rofesional en Sistemas - Fred IBRD / 89370 ance of the Multipurpose Ca Post Direct 5,750.83 0.00 Canceled 2021-09-17 2021-09-21 2021-09-25 2021-10-02 2021-12-24 ant Selection y Alexander Bejarano Gambo dastre a CO-ANT-253044-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Especializa IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,989.61 0.00 Canceled 2021-09-17 2021-09-21 2021-09-25 2021-10-02 2021-12-24 ant Selection do - Jonatan David Mercado V dastre ega CO-ANT-253045-CS-INDV / P Implementation and Mainten Individual Consult rofesional Agronómico - Hern IBRD / 89370 ance of the Multipurpose Ca Post Direct 5,750.83 0.00 Canceled 2021-09-17 2021-09-21 2021-09-25 2021-10-02 2021-12-24 ant Selection an Enrique Julio Gonzalez dastre CO-ANT-256760-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,313.12 0.00 Canceled 2021-10-12 2021-10-16 2021-10-20 2021-10-27 2021-12-24 ant Selection ario - Luisa Fernanda Santan dastre a Callejas CO-ANT-256761-CS-INDV / P Implementation and Mainten Individual Consult rofesional catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,313.12 2,504.71 Completed 2021-10-12 2021-10-13 2021-10-16 2021-10-19 2021-10-20 2021-10-22 2021-10-27 2021-10-28 2021-12-24 2021-12-25 ant Selection ario - Juan Pablo Castro Loza dastre no CO-ANT-256766-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,313.12 2,257.18 Completed 2021-10-12 2021-10-14 2021-10-16 2021-10-19 2021-10-20 2021-10-22 2021-10-27 2021-11-04 2021-12-24 2021-12-25 ant Selection ario - Jefferson Pulido Sáenz dastre CO-ANT-256768-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,313.12 2,504.71 Completed 2021-10-12 2021-10-13 2021-10-16 2021-10-19 2021-10-20 2021-10-22 2021-10-27 2021-10-28 2021-12-24 2021-12-25 ant Selection ario - Carlos Mauricio Benítez dastre Varón CO-ANT-256769-CS-INDV / Lí Implementation and Mainten Individual Consult der de Gestión Documental - IBRD / 89370 ance of the Multipurpose Ca Post Direct 3,776.77 2,155.37 Completed 2021-10-12 2021-10-13 2021-10-16 2021-10-19 2021-10-20 2021-10-22 2021-10-27 2021-10-29 2021-12-24 2021-12-25 ant Selection Melissa Andrea Tolosa Carvaj dastre al CO-ANT-258551-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.42 1,909.92 Completed 2021-10-22 2021-10-22 2021-10-26 2021-10-23 2021-10-28 2021-10-26 2021-11-03 2021-11-12 2021-12-24 2021-12-25 ant Selection io 1 - Rolando Javier Stevens dastre on Monroy CO-ANT-259467-CS-INDV / P Implementation and Mainten Individual Consult rofesional Agronómico - HER IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.41 2,210.16 Completed 2021-10-29 2021-10-26 2021-11-02 2021-10-26 2021-11-06 2021-10-28 2021-11-13 2021-11-05 2021-12-24 2021-12-25 ant Selection NAN ENRIQUE JULIO GONZAL dastre EZ CO-ANT-259469-CS-INDV / P Implementation and Mainten Individual Consult rofesional Agronómico - Migu IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.41 2,253.50 Completed 2021-10-29 2021-10-26 2021-11-02 2021-10-26 2021-11-06 2021-10-28 2021-11-13 2021-11-04 2021-12-24 2021-12-25 ant Selection el de Jesús Vanegas Zambra dastre no CO-ANT-259471-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Especializa IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,494.80 3,522.64 Completed 2021-10-29 2021-10-26 2021-11-02 2021-10-26 2021-11-06 2021-10-28 2021-11-13 2021-11-04 2021-12-24 2021-12-25 ant Selection do - INGRID SOFIA RAMIREZ dastre MIUSKUS CO-ANT-259472-CS-INDV / P Implementation and Mainten Individual Consult rofesional jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.41 2,007.67 Completed 2021-10-29 2021-10-26 2021-11-02 2021-10-26 2021-11-06 2021-10-28 2021-11-13 2021-11-11 2021-12-24 2021-12-25 ant Selection io I - RAFAEL EDUARDO ORTI dastre Z SALCEDO Page 7 CO-ANT-259473-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Especializa IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,494.80 3,454.89 Completed 2021-10-29 2021-10-26 2021-11-02 2021-10-26 2021-11-06 2021-10-28 2021-11-13 2021-11-05 2021-12-24 2021-12-25 ant Selection do - YOMEIDA ELJAUDUE ISAZ dastre A CO-ANT-259474-CS-INDV / P Implementation and Mainten rofesional catastral Especializ Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,494.80 3,138.36 Completed 2021-10-29 2021-10-26 2021-11-02 2021-10-26 2021-11-06 2021-10-28 2021-11-13 2021-11-11 2021-12-24 2021-12-25 ado - LEIDY CAROLINA CASTI ant Selection dastre BLANCO FRANCO CO-ANT-260261-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Especiali IBRD / 89370 ance of the Multipurpose Ca Post Direct 4,494.80 2,506.49 Completed 2021-11-03 2021-11-03 2021-11-07 2021-11-07 2021-11-11 2021-11-11 2021-11-18 2021-11-19 2021-12-24 2021-12-25 ant Selection zado - MAYRA YULIANA DIAZ dastre AVENDAÑO CO-ANT-259468-CS-INDV / P Implementation and Mainten Individual Consult rofesional Agronómico - Alfre IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.41 0.00 Canceled 2021-10-29 2021-11-02 2021-11-06 2021-11-13 2021-12-24 ant Selection do Chávez Gonzalez dastre CO-ANT-261550-CS-INDV / P Implementation and Mainten Individual Consult rofesional Agronómico - MARI IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.41 1,597.84 Completed 2021-11-10 2021-11-09 2021-11-14 2021-11-15 2021-11-18 2021-11-17 2021-11-25 2021-11-19 2021-12-24 2021-12-25 ant Selection A JOSE PATERNINA AMADOR dastre CO-ANT-266045-CS-INDV / G ICT Development and Streng Individual Consult estor de Proyecto Fortalecimi IBRD / 89370 thening of the National Spati Post Direct 32,775.00 31,223.75 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-10 2022-01-11 2022-01-13 2022-01-11 2022-01-25 2022-12-27 2023-01-06 ant Selection ento tecnológico - Luz Adrian al Data Infrastructure a García CO-ANT-266047-CS-INDV / C Implementation and Mainten Individual Consult oordinador Técnico - Juan Ro IBRD / 89370 ance of the Multipurpose Ca Post Direct 52,316.00 49,361.62 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-10 2022-01-11 2022-01-11 2022-01-11 2022-01-23 2022-12-31 2023-01-10 ant Selection drigo Higuera dastre CO-ANT-266049-CS-INDV / A Implementation and Mainten Individual Consult poyo a la supervisión de cont IBRD / 89370 ance of the Multipurpose Ca Post Limited 12,971.00 0.00 Canceled 2022-08-05 2022-08-10 2022-08-20 2022-08-30 2022-12-31 ant Selection ratos tercerizados Senior dastre CO-ANT-266053-CS-INDV / P Individual Consult IBRD / 89370 Project Management Post Direct 18,843.00 17,748.23 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-20 2022-01-11 2022-01-12 2022-01-11 2022-01-24 2022-12-31 2023-01-10 rofesional financiero - Laura ant Selection Chia CO-ANT-266054-CS-INDV / E Individual Consult specialista Financiero - Germ IBRD / 89370 Project Management Post Direct 46,575.00 41,138.53 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-17 2022-01-11 2022-01-25 2022-01-11 2022-02-07 2022-12-30 2023-01-10 ant Selection an Jimenez CO-ANT-266057-CS-INDV / P Implementation and Mainten Individual Consult rofesional Senior DGJT - Migu IBRD / 89370 ance of the Multipurpose Ca Post Direct 29,753.00 28,013.49 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-21 2022-01-11 2022-01-11 2022-01-11 2022-01-23 2022-12-31 ant Selection el Andres Martinez dastre CO-ANT-266058-CS-INDV / P Implementation and Mainten Individual Consult rofesional Senior DAT - Gina IBRD / 89370 ance of the Multipurpose Ca Post Direct 29,753.00 28,013.49 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-13 2022-01-11 2022-01-14 2022-01-11 2022-01-26 2022-12-31 2023-01-10 ant Selection Cristina Castro (Recontrataci dastre ón) CO-ANT-266059-CS-INDV / P Implementation and Mainten rofesional Senior Contratos d Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct 29,753.00 28,013.49 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-14 2022-01-11 2022-01-15 2022-01-11 2022-01-27 2022-12-31 2023-01-10 e Uso - Nancy Julieta Camelo ant Selection dastre (Recontratación) CO-ANT-266060-CS-INDV / P Implementation and Mainten Individual Consult rofesional Junior DAT - Lina M IBRD / 89370 ance of the Multipurpose Ca Post Direct 19,835.00 18,682.34 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-29 2022-01-11 2022-01-14 2022-01-11 2022-01-26 2022-12-31 2023-01-10 ant Selection aria Peña (Recontratación) dastre CO-ANT-266061-CS-INDV / C oordinador de Gestión Opera Individual Consult IBRD / 89370 Project Management Post Direct 51,241.00 48,245.45 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-10 2022-01-11 2022-01-11 2022-01-11 2022-01-23 2022-12-31 2023-01-10 tiva - Fredy Alexander Casta ant Selection ñeda (Recontratación) CO-ANT-266062-CS-INDV / E Individual Consult specialista PMS - Paola Andre IBRD / 89370 Project Management Post Direct 46,575.00 43,592.13 Completed 2021-12-10 2021-12-07 2022-01-11 2021-12-16 2022-01-11 2022-01-12 2022-01-11 2022-01-24 2022-12-31 2023-01-10 ant Selection a Gonzalez CO-ANT-266063-CS-INDV / P Individual Consult rofesional Adquisiciones - Pol IBRD / 89370 Project Management Post Direct 19,274.00 17,136.56 Completed 2021-12-10 2021-12-09 2022-01-03 2022-01-10 2022-01-03 2022-01-10 2022-01-03 2022-01-23 2022-12-31 ant Selection iana Grajales (Recontratación ) CO-ANT-266065-CS-INDV / E Individual Consult specialista en Adquisiciones - IBRD / 89370 Project Management Post Direct 53,512.00 49,361.62 Completed 2021-12-10 2021-12-07 2022-01-03 2022-01-07 2022-01-03 2022-01-11 2022-01-03 2022-01-23 2022-12-31 2023-01-10 ant Selection Bertha Lucia Cordero (Recont ratación) CO-ANT-236899-CS-INDV / P Individual Consult IBRD / 89370 Project Management Post Limited 12,444.44 0.00 Canceled 2021-06-04 2021-05-31 2021-06-09 2021-06-19 2021-06-22 2021-12-24 rofesional de Apoyo Abogado ant Selection GIGT CO-ANT-266104-CS-INDV / C Implementation and Mainten Individual Consult alidad Enrutamiento San Ono IBRD / 89370 ance of the Multipurpose Ca Post Limited 4,456.00 0.00 Canceled 2022-09-01 2022-09-11 2022-09-21 2022-10-11 2022-12-23 ant Selection fre, Zambrano - BM (apoyo a dastre la supervisión) CO-ANT-266107-CS-INDV / C Implementation and Mainten Individual Consult alidad Enrutamiento San Ono IBRD / 89370 ance of the Multipurpose Ca Post Limited 4,456.00 0.00 Canceled 2022-09-01 2022-09-11 2022-09-21 2022-10-11 2022-12-23 ant Selection fre, Zambrano - BM (apoyo a dastre la supervisión) CO-ANT-266108-CS-INDV / C Implementation and Mainten Individual Consult alidad Enrutamiento San Ono IBRD / 89370 ance of the Multipurpose Ca Post Limited 4,456.00 0.00 Canceled 2022-09-01 2022-09-11 2022-09-21 2022-10-11 2022-12-23 ant Selection fre, Zambrano - BM (apoyo a dastre la supervisión) CO-ANT-266110-CS-INDV / C Implementation and Mainten Individual Consult alidad Enrutamiento San Ono IBRD / 89370 ance of the Multipurpose Ca Post Limited 4,456.00 0.00 Canceled 2022-09-01 2022-09-11 2022-09-21 2022-10-11 2022-12-23 ant Selection fre, Zambrano - BM (apoyo a dastre la supervisión) CO-ANT-259470-CS-INDV / P Implementation and Mainten Individual Consult rofesional Agronómico - WILL IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.41 0.00 Canceled 2021-10-29 2021-11-02 2021-11-06 2021-11-13 2021-12-24 ant Selection IAM ALBERTO ACUÑA OCHOA dastre CO-ANT-260689-CS-CDS / Co Implementation and Mainten nvenio de Asistencia Técnica IBRD / 89370 ance of the Multipurpose Ca Prior Direct Selection Direct 1,153,733.00 0.00 Canceled 2021-11-10 2021-11-15 2021-12-06 2022-07-31 en el marco del Convenio sus dastre crito entre el Banco Mundial y la FAO CO-ANT-258544-CS-INDV / P Implementation and Mainten Individual Consult rofesional Catastral Universit IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.42 0.00 Canceled 2021-10-22 2021-10-26 2021-10-28 2021-11-03 2021-12-24 ant Selection ario - Diego Fernando Limas dastre CO-ANT-258550-CS-INDV / P Implementation and Mainten Individual Consult rofesional Jurídico Universitar IBRD / 89370 ance of the Multipurpose Ca Post Direct 2,875.42 0.00 Canceled 2021-10-22 2021-10-26 2021-10-28 2021-11-03 2021-12-24 ant Selection io 1 - Miguel Gustavo Elián S dastre alom Borré Page 8 CO-ANT-249828-CS-INDV / P Implementation and Mainten rofesional Catastral Especiali Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct 8,989.61 0.00 Canceled 2021-08-30 2021-09-07 2021-09-03 2021-09-07 2021-09-14 2021-12-24 zado - DIEGO FERNANDO SA ant Selection dastre NCHEZ VARGAS CO-ANT-266358-CS-INDV / P Individual Consult IBRD / 89370 Project Management Post Limited 18,843.00 0.00 Canceled 2022-03-10 2022-02-22 2022-03-15 2022-03-25 2022-04-01 2022-12-31 rofesional de apoyo PMS ant Selection CO-ANT-270860-CS-INDV / A Implementation and Mainten Individual Consult IBRD / 89370 Post Direct 4,695.00 4,381.80 Completed 2022-01-07 2021-12-30 2022-01-13 2022-01-04 2022-01-14 2022-01-18 2022-01-18 2022-01-30 2022-09-07 2022-10-08 uxiliar Administrativo - Maria ance of the Multipurpose Ca ant Selection Jose Diaz dastre CO-ANT-266300-CS-CDS / Co Implementation and Mainten nvenio de Asistencia Técnica IBRD / 89370 ance of the Multipurpose Ca Post Direct Selection Direct 995,363.00 948,016.31 Signed 2021-12-15 2022-01-24 2022-01-03 2022-01-25 2022-01-24 2022-02-09 2022-07-30 en el marco del Convenio sus dastre crito entre el Banco Mundial y la FAO CO-ANT-330017-CS-INDV / A poyar a la Agencia Nacional de Tierras como Profesional OSPR Jurídico Senior, en las a Implementation and Mainten Individual Consult ctividades técnicas y operati IBRD / 89370 ance of the Multipurpose Ca Post Limited 28,369.00 0.00 Canceled 2023-01-24 2023-01-30 2023-02-06 2023-02-15 2023-12-31 ant Selection vas necesarias para la plane dastre ación e implementación de la s diferentes etapas de la Rut a de Ordenamiento Social de la Propiedad Rural... CO-ANT-335070-CS-INDV / C Implementation and Mainten Individual Consult oordinador de Gestión Opera IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 35,647.00 0.00 Canceled 2023-01-23 2023-01-25 2023-01-27 2023-01-13 2023-01-28 2023-01-31 2023-07-30 ant Selection tiva Eduardo Medina Sánchez dastre CO-ANT-335794-CS-INDV / E Individual Consult specialista Financiero Germá IBRD / 89370 Project Management Post Direct - National 5,756.00 0.00 Signed 2023-01-11 2023-01-25 2023-01-11 2022-12-12 2023-01-11 2023-01-27 2023-01-13 2023-02-27 ant Selection n Enrique Jiménez Gaitán CO-ANT-335795-CS-INDV / E specialista en Planificación, S Individual Consult IBRD / 89370 Project Management Post Direct - National 5,756.00 0.00 Completed 2023-01-11 2023-01-25 2023-01-11 2023-01-04 2023-01-11 2023-01-20 2023-01-13 2023-02-27 2023-02-26 eguimiento y Monitoreo Paol ant Selection a Andrea González Torres CO-ANT-335793-CS-INDV / E specialista en Adquisiciones Individual Consult IBRD / 89370 Project Management Post Direct - National 26,026.00 0.00 Signed 2023-01-11 2023-01-25 2023-01-11 2022-12-27 2023-01-11 2023-01-20 2023-01-13 2023-07-12 de Banca Multilateral, Bertha ant Selection Lucía Cordero Otero CO-ANT-335060-CS-INDV / P rofesional de Apoyo a la impl Implementation and Mainten Individual Consult ementación del Procedimient IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 21,842.00 0.00 Signed 2023-01-23 2023-01-25 2023-01-26 2023-01-26 2023-01-26 2023-01-30 2023-01-29 2023-12-31 ant Selection o único de Ordenamiento Soc dastre ial de la Propiedad Rural Lina María Peña Morales CO-ANT-334985-CS-INDV / G Implementation and Mainten Individual Consult estor Administrativo en territ IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 9,974.00 0.00 Signed 2023-01-23 2023-01-25 2023-01-26 2023-01-26 2023-01-26 2023-01-26 2023-01-29 2023-12-31 ant Selection orio María José Díaz Vargas dastre CO-ANT-339628-CS-INDV / C Implementation and Mainten Individual Consult oordinadora Técnica del Prog IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 26,026.00 0.00 Signed 2023-01-31 2023-01-31 2023-01-31 2023-01-13 2023-01-31 2023-02-06 2023-02-03 2023-08-02 ant Selection rama - Alba Liliana Martínez dastre Zárate CO-ANT-331265-CS-CDS / Co nvenio de Asistencia Técnica Implementation and Mainten Direct - Internation con Organismo de Naciones IBRD / 89370 ance of the Multipurpose Ca Prior Direct Selection 1,867,252.00 0.00 Canceled 2022-12-13 2022-12-14 2022-12-13 2022-12-28 2022-12-15 2023-12-15 al Unidas en el marco del conve dastre nio suscrito entre el Banco M undial y OIM CO-ANT-330014-CS-CDS / Co Implementation and Mainten Direct - Internation Under Implement nvenio de Asistencia Técnica IBRD / 89370 ance of the Multipurpose Ca Prior Direct Selection 2,961,227.00 0.00 2023-02-10 2023-02-14 2023-02-17 2023-03-09 2023-02-27 2024-01-26 al ation con un Organismo de Nacion dastre es Unidas CO-ANT-343116-CS-INDV / C Implementation and Mainten oordinador de Gestión Opera Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 65,351.97 0.00 Signed 2023-02-17 2023-02-16 2023-02-17 2023-02-09 2023-02-17 2023-02-17 2023-02-20 2023-12-31 tiva del Programa - Carlos Ro ant Selection dastre drigo Vera Zapata CO-ANT-343119-CS-INDV / P rofesional de Apoyo Financier Individual Consult IBRD / 89370 Project Management Post Direct - National 17,185.87 0.00 Signed 2023-02-17 2023-02-16 2023-02-17 2023-02-07 2023-02-17 2023-02-20 2023-02-20 2023-12-31 o - Laura Constanza Chía Mel ant Selection o - Recontratación CO-ANT-343121-CS-INDV / E Individual Consult specialista Financiero - Germ IBRD / 89370 Project Management Post Direct - National 40,292.22 0.00 Signed 2023-02-17 2023-02-16 2023-02-17 2023-02-07 2023-02-17 2023-02-17 2023-02-20 2023-12-31 ant Selection án Enrique Jiménez Gaitán - Recontratación CO-ANT-343125-CS-INDV / E specialista en Planeación Seg Individual Consult IBRD / 89370 Project Management Post Direct - National 40,292.22 0.00 Signed 2023-02-17 2023-02-16 2023-02-17 2023-02-07 2023-02-17 2023-02-17 2023-02-20 2023-12-31 uimiento y Monitoreo - Paola ant Selection Andrea González - Recontrat ación CO-ANT-348166-CS-CDS / Es Implementation and Mainten pecialista en desarrollo y ad Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 16,658.00 0.00 Signed 2023-03-13 2023-03-21 2023-03-13 2023-02-14 2023-03-13 2023-03-24 2023-03-15 2023-12-31 ministración de bases de dat ant Selection dastre os - Diego Avella CO-ANT-348168-CS-CDS / Es Implementation and Mainten pecialista en desarrollo y ad Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 16,658.00 0.00 Canceled 2023-03-13 2023-03-13 2023-03-13 2023-03-15 2023-12-31 ministración de bases de dat ant Selection dastre os - Remy Galan CO-ANT-348170-CS-CDS / Es Implementation and Mainten pecialista en desarrollo y ad Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 16,658.00 0.00 Canceled 2023-03-13 2023-03-13 2023-03-13 2023-03-15 2023-12-31 ministración de bases de dat ant Selection dastre os - Leonardo Rodriguez CO-ANT-348174-CS-CDS / Es Implementation and Mainten Individual Consult IBRD / 89370 Post Direct - National 16,338.00 0.00 Signed 2023-03-13 2023-03-21 2023-03-13 2023-02-28 2023-03-13 2023-03-24 2023-03-15 2023-12-31 pecialista agrotécnico - Ernes ance of the Multipurpose Ca ant Selection to Sierra dastre CO-ANT-348469-CS-INDV / E Implementation and Mainten Individual Consult IBRD / 89370 Post Direct - National 16,338.00 0.00 Signed 2023-03-13 2023-03-21 2023-03-13 2023-02-28 2023-03-13 2023-03-24 2023-03-15 2023-12-31 specialista agrotécnico - Dani ance of the Multipurpose Ca ant Selection Lopez dastre CO-ANT-348470-CS-INDV / E Implementation and Mainten Individual Consult IBRD / 89370 Post Direct - National 16,338.00 0.00 Signed 2023-03-13 2023-03-21 2023-03-13 2023-03-02 2023-03-13 2023-03-24 2023-03-15 2023-12-31 specialista agrotécnico - Walt ance of the Multipurpose Ca ant Selection er Leon dastre Page 9 CO-ANT-348478-CS-INDV / P Implementation and Mainten Individual Consult Under Implement rofesional Técnico Senior - N IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 24,669.00 0.00 2023-03-17 2023-03-17 2023-03-17 2023-03-19 2023-12-31 ant Selection ation estor Lagos dastre CO-ANT-348471-CS-INDV / E Implementation and Mainten Individual Consult specialista agroforestal - Jim IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 9,161.00 0.00 Signed 2023-03-13 2023-03-22 2023-03-13 2023-02-28 2023-03-13 2023-03-24 2023-03-24 2023-09-12 ant Selection my Chavez dastre CO-ANT-348164-CS-CDS / Es Implementation and Mainten pecialista en desarrollo y ad Individual Consult IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 16,658.00 0.00 Signed 2023-03-13 2023-03-22 2023-03-13 2023-02-10 2023-03-13 2023-03-24 2023-03-24 2023-12-31 ministración de bases de dat ant Selection dastre os - Andres Vera CO-ANT-357042-CS-INDV / P Implementation and Mainten rofesional Comunicaciones U Individual Consult Under Implement IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 11,383.00 0.00 2023-04-28 2023-05-04 2023-04-28 2023-03-23 2023-04-30 2023-05-02 2023-12-31 GT - Bolívar - PATRICIA DEL ant Selection ation dastre CARMEN DIAZ CASTRO CO-ANT-357043-CS-INDV / P Implementation and Mainten Individual Consult Under Implement rofesional Abogado UGT - Bol IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 11,383.00 0.00 2023-04-28 2023-05-04 2023-04-28 2023-03-23 2023-04-30 2023-05-02 2023-12-31 ant Selection ation ívar - OSIRIS XIOMAR MARTIN dastre EZ FUENTES CO-ANT-357044-CS-INDV / P Implementation and Mainten rofesional de Apoyo Administ Individual Consult Under Implement IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 11,383.00 0.00 2023-04-28 2023-05-04 2023-04-28 2023-03-23 2023-04-30 2023-05-02 2023-12-31 rativo UGT Bolívar - ALCIDES ant Selection ation dastre JOSE MERIÑO RODRIGUEZ CO-ANT-357791-CS-INDV / P Implementation and Mainten rofesional de Seguimiento y Individual Consult Under Implement IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 12,581.00 0.00 2023-04-28 2023-05-04 2023-04-28 2023-03-23 2023-04-30 2023-05-02 2023-12-31 Control de Bases de Datos - J ant Selection ation dastre ose Luis Morales Castro CO-ANT-358427-CS-INDV / P Implementation and Mainten Individual Consult Under Implement rofesional Diferencial y de gé IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 11,383.00 0.00 2023-04-28 2023-05-04 2023-04-28 2023-04-05 2023-04-30 2023-05-02 2023-12-31 ant Selection ation nero UGT Bolivar DINAY PAT dastre RICIA TEHERAN CO-ANT-358760-CS-INDV / P Implementation and Mainten rofesional Historiador Especi Individual Consult Under Implement IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 18,452.00 0.00 2023-04-28 2023-05-04 2023-04-28 2023-03-16 2023-04-30 2023-05-02 2023-12-31 alizado - ADRIANA MARIA CA ant Selection ation dastre STAÑEDA RODRIGUEZ CO-ANT-358764-CS-INDV / P Implementation and Mainten Individual Consult rofesional social universitario IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 10,646.00 0.00 Canceled 2023-04-28 2023-05-04 2023-04-28 2023-03-08 2023-04-30 2023-05-02 2023-12-31 ant Selection - SANDRA MILENA DIAZ CUE dastre RVO CO-ANT-360956-CS-INDV / P Implementation and Mainten Individual Consult Under Implement ecuario junior territorial UAF - IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 10,984.00 0.00 2023-05-12 2023-05-22 2023-05-12 2023-05-12 2023-05-15 2023-12-31 ant Selection ation ANDRES FELIPE GUTIERREZ dastre ARANGO CO-ANT-361390-CS-INDV / P Implementation and Mainten Individual Consult Under Implement rofesional en Planeación para IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 10,671.00 0.00 2023-05-15 2023-05-22 2023-05-15 2023-05-15 2023-05-16 2023-12-31 ant Selection ation la UGT Bolívar - Pedro Herazo dastre CO-ANT-361393-CS-INDV / A ICT Development and Streng Individual Consult Pending Impleme rquitecto Senior Geoespacial IBRD / 89370 thening of the National Spati Post Limited 27,436.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation - Comparación Hojas de vida al Data Infrastructure CO-ANT-361394-CS-INDV / A ICT Development and Streng Individual Consult Pending Impleme rquitecto Senior Soluciones e IBRD / 89370 thening of the National Spati Post Limited 27,436.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation n la nube - Comparación Hoj al Data Infrastructure as de Vida CO-ANT-361395-CS-INDV / A ICT Development and Streng Individual Consult Pending Impleme rquitecto Senior de Infraestru IBRD / 89370 thening of the National Spati Post Limited 27,436.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ctura de TI - Comparación Ho al Data Infrastructure jas de vida CO-ANT-361396-CS-INDV / Lí ICT Development and Streng Individual Consult Pending Impleme der Senior de Desarrollo - Co IBRD / 89370 thening of the National Spati Post Limited 27,436.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation mparación Hojas de vida al Data Infrastructure CO-ANT-361399-CS-INDV / A ICT Development and Streng Individual Consult Pending Impleme rquitecto Senior de Software IBRD / 89370 thening of the National Spati Post Limited 27,436.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation - Comparación hojas de vida al Data Infrastructure CO-ANT-361405-CS-INDV / Lí ICT Development and Streng Individual Consult Pending Impleme der Senior de Requerimiento IBRD / 89370 thening of the National Spati Post Limited 18,558.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation s y QA - Comparación de hoja al Data Infrastructure s de vida CO-ANT-361406-CS-INDV / A ICT Development and Streng Individual Consult Pending Impleme nalista de Requerimientos - C IBRD / 89370 thening of the National Spati Post Limited 16,116.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation omparación de hojas de vida al Data Infrastructure CO-ANT-361407-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Senior - Compar IBRD / 89370 thening of the National Spati Post Limited 16,116.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ación de hojas de vida al Data Infrastructure CO-ANT-361408-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Senior - Compar IBRD / 89370 thening of the National Spati Post Limited 16,116.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ación de hojas de vida al Data Infrastructure CO-ANT-361409-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Senior - Compar IBRD / 89370 thening of the National Spati Post Limited 16,116.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ación de hojas de vida al Data Infrastructure CO-ANT-361410-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Senior - Compar IBRD / 89370 thening of the National Spati Post Limited 16,116.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ación de hojas de vida al Data Infrastructure CO-ANT-361411-CS-INDV / In ICT Development and Streng Individual Consult Pending Impleme geniero SIG y Catastral - Com IBRD / 89370 thening of the National Spati Post Limited 14,025.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation paración de hojas de vida al Data Infrastructure CO-ANT-361412-CS-INDV / In ICT Development and Streng Individual Consult Pending Impleme geniero de Pruebas y Calidad IBRD / 89370 thening of the National Spati Post Limited 14,025.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation - Comparación de hojas de vi al Data Infrastructure da CO-ANT-361413-CS-INDV / In ICT Development and Streng Individual Consult Pending Impleme geniero de Pruebas y Calidad IBRD / 89370 thening of the National Spati Post Limited 14,025.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation - Comparación de hojas de vi al Data Infrastructure da Page 10 CO-ANT-361414-CS-INDV / E ICT Development and Streng Individual Consult Pending Impleme specialista BD Senior - Comp IBRD / 89370 thening of the National Spati Post Limited 18,558.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation aración de hojas de vida al Data Infrastructure CO-ANT-361415-CS-INDV / E ICT Development and Streng Individual Consult Pending Impleme specialista BD Senior - Comp IBRD / 89370 thening of the National Spati Post Limited 18,558.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation aración de hojas de vida al Data Infrastructure CO-ANT-361416-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Junior - Compara IBRD / 89370 thening of the National Spati Post Limited 13,089.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ción de hojas de vida al Data Infrastructure CO-ANT-361417-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Junior - Compara IBRD / 89370 thening of the National Spati Post Limited 13,089.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ción de hojas de vida al Data Infrastructure CO-ANT-361418-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Junior - Compara IBRD / 89370 thening of the National Spati Post Limited 13,089.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ción de hojas de vida al Data Infrastructure CO-ANT-361419-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Junior - Compara IBRD / 89370 thening of the National Spati Post Limited 13,089.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ción de hojas de vida al Data Infrastructure CO-ANT-361420-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Junior - Compara IBRD / 89370 thening of the National Spati Post Limited 13,089.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ción de hojas de vida al Data Infrastructure CO-ANT-361421-CS-INDV / D ICT Development and Streng Individual Consult Pending Impleme esarrollador Junior - Compara IBRD / 89370 thening of the National Spati Post Limited 13,089.00 0.00 2023-05-19 2023-05-24 2023-05-29 2023-06-15 2023-12-31 ant Selection ntation ción de hojas de vida al Data Infrastructure CO-ANT-361559-CS-INDV / P Implementation and Mainten rofesional Social Junior de At Individual Consult Under Implement IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 7,252.00 0.00 2023-05-19 2023-05-22 2023-05-24 2023-05-31 2023-06-09 2023-12-31 ención en Campo - María Isa ant Selection ation dastre bel Pinto Fernández CO-ANT-361561-CS-INDV / P Implementation and Mainten Individual Consult Under Implement rofesional Social Junior de At IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 7,252.00 0.00 2023-05-19 2023-05-22 2023-05-24 2023-05-31 2023-06-09 2023-12-31 ant Selection ation encion en Campo - Carolina I dastre sabel Galvis CO-ANT-361564-CS-INDV / Fi Implementation and Mainten Individual Consult Under Implement nanciero UGT Bolívar - EDUA IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 10,671.00 0.00 2023-05-19 2023-05-22 2023-05-24 2023-05-31 2023-06-09 2023-12-31 ant Selection ation RDO HERRERA dastre CO-ANT-361565-CS-INDV / SI Implementation and Mainten Individual Consult Under Implement T-TICS UGT Bolívar - GUILLIB IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 10,671.00 0.00 2023-05-19 2023-05-22 2023-05-24 2023-05-31 2023-06-09 2023-12-31 ant Selection ation ALDO OLIER CASTRO dastre CO-ANT-361883-CS-INDV / P Implementation and Mainten Individual Consult Under Implement rofesional Historiador Univers IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 9,315.00 0.00 2023-05-19 2023-05-22 2023-05-24 2023-05-31 2023-06-09 2023-12-31 ant Selection ation itario - Luis Enrique Rodrígue dastre z Angulo CO-ANT-367263-CS-INDV / P rofesional Apoyo a la imple Implementation and Mainten Individual Consult Pending Impleme mentación del Procedimiento IBRD / 89370 ance of the Multipurpose Ca Post Direct - National 12,481.00 0.00 2023-06-16 2023-06-16 2023-06-20 2023-06-22 2023-12-31 ant Selection ntation Único del ordenamiento soci dastre al de la propiedad rural - Lau ra Sofia Mejía CO-ANT-367284-CS-INDV / E Individual Consult Pending Impleme IBRD / 89370 Project Management Post Limited 26,861.00 0.00 2023-06-16 2023-06-20 2023-06-28 2023-07-12 2023-12-31 specialista financiero por 3C ant Selection ntation V CO-ANT-367285-CS-INDV / E specialista en Planeación Seg Individual Consult Pending Impleme IBRD / 89370 Project Management Post Limited 26,861.00 0.00 2023-06-16 2023-06-20 2023-06-28 2023-07-12 2023-12-31 uimiento y Monitoreo - Contr ant Selection ntation atación por proceso de 3CV CO-ANT-367288-CS-INDV / P Individual Consult Pending Impleme rofesional de Apoyo en Adqui IBRD / 89370 Project Management Post Limited 13,480.00 0.00 2023-06-16 2023-06-20 2023-06-28 2023-07-12 2023-12-31 ant Selection ntation siciones - Selección por 3CV Page 11 2018 Procurement Plan Mineral Sector Support for Economic Diversification Project (MinDiver) I. General 1. Project information: Country: Nigeria Borrower: Federal Government of Nigeria Project Name: Mineral Sector Support for Economic Diversification Project Credit No.: 59900 Project ID No: P159761 Project Implementing Agencies: Ministry of Mines and Steel Development (MMSD) 2. Bank’s approval Date of the Original Procurement Plan: 27th March 2017 3. Bank’s approval Date of the Revised Procurement Plan: 19th April, 2017 Date of General Procurement Notice: Online December 27, 2017 4. Period covered by this procurement plan: 1st January 2018 to 31st December 2018 II. Goods, Supply and Installation and Works and non-consulting services 5. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold 1. ICB and LIB (Goods) >=1,000,000 All Contracts 2. ICB (Works/Supply & >=10,000,000 All Contracts Installation) 3. ICB (Non-Consultant >=500,000 All Contracts Services) 4. Direct Contracting All Values All Contracts 5. NCB (Goods) <=1,000,000 All Contracts 6. NCB (Works) <=10,000,000 All Contracts 7. Shopping <=100,000 All Contracts (a) List of contract Packages which will be procured following ICB and Direct contracting. (b) ICB Contracts estimated to cost above US$500,000 equivalent or more per Contract and all Direct Contracting will be subject to prior review by the Bank. 6. Prequalification: Nil 7. Proposed Procedures for CDD Components (as per paragraph 3.17 of the Guidelines): NA Reference to (if any) Project Operational/Procurement Manual: The Procurement Plan will also form part of the Project Implementation Manual. Any Other Special Procurement Arrangements: (including advance procurement and retroactive financing, if applicable): N/A. 8. Procurement Packages with Methods and Time Schedule. 9. Procurement Packages with Methods and Time Schedule for Goods and Works Procurement Reviews and Thresholds Table 2.4. Procurement of Goods and Works and Non-consulting Services Prior Review Threshold Procurement Method Comments (US$) 1 NCB (goods) packages Above 750,000 All 2 Non-consultant Services packages Above 750,000 All 3 Shopping (goods) Below 100,000 None 4 Shopping (works) Below 200,000 None Summary of the procurement packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement). 18-Month Procurement Plan for Goods and Works Contract Original Prior Expected Activi Type Procureme or Estimated ty List of Time nt Estimate Proposal Completio Post n Contrac Revie Submissi # ts Based or Type (US$, w on Dates Lump Sum thousands) Dates Equipmen Lump July 1, 1 t Sum Not 2,000.00 Prior 2017 September for Stated 29, 2017 vocationa l training Lump 2 Office Sum NS 200.00 Post June 1, 30 August, Equipmen t 2017 2017 for MinDiver and other agencies Solar Lump 3 System Sum NS 50.00 Post August 1, October 30, system for 2017 2017 NGSA Lump 5 Motor Sum NS 75.00 Prior June 1, August 30, vehicles - 2017 2017 Saloon Cars (6) Lump 6 Motor Sum NS 175.00 Prior May 1, July 30, vehicles - 4 2017 2017 ×4 (seven) Completi 7 on Bill of NS 70.00 Post of the Quantities dimensio n stone laborator y in Kaduna Selection of Consultants Prior review threshold. Selection decisions subject to prior review by the World Bank as stated in the Procurement Regulations. Selections Subject to Prior Review by the World Bank Prior Review Threshold Selection Method (US$) Comments Competitive Methods 1. (Firms) Above 300,000 2. Single Source (Firms) All 3. Individual Above 100,000 41. Short list consisting entirely of national consultants. A short list of consultants for services estimated to cost less than US$300,000 equivalent per contract may consist entirely of national consultants. Consultancy Assignments with Selection Methods and Time Schedule 18-Month Procurement Plan for Consultancy Contract Original Prior Expected Activit Procur or Estimated y List of Type Time Estimate Proposal Completio Contracts ement Post Submissio n # Based or (US$, n Type Review Dates thousands Lump Sum ) Dates Consultancies May 1, A1-1.1 Functional analysis Lump Sum QCBS 1,000.00 Prior 2017 October 28, within the MMSD, its 2018 associated agencies, and other MDAs based on identifying and reviewing the workflows and information flows A1-1.2 Upgrading and Lump Sum SS 440.00 Prior November June 29, automation of the 1, 2017 2018 MCO Review and update May 6, A1-2.1 of Lump Sum QCBS 600.00 Prior 2017 May 1, 2019 the NMMA, 2007 Assisting the GoN A1-4.1 to Lump Sum QCBS 250.00 Post November October 27, build the required 1, 2017 2018 technical skills and managerial capabilities to service and develop the mining sector Design and May 1, A1-7.1 develop a Lump Sum IC 300.00 Prior 2017 March 27, mechanism for citizen 2018 engagement and social accountability in the MinDiver project and the mining sector Contract Original Prior Expected Activit Procur or Estimated y List of Type Time Estimate Proposal Completio Contracts ement Post Submissio n # Based or (US$, n Type Review Dates thousands Lump Sum ) Dates Geological May 1, A2-1-3.1 mapping, Lump Sum QCBS 14,000.00 Prior 2017 December GIS geodata base, 22, 2018 mapping, and reinterpretation of data, and mineral prospectivity targeting May 1, A2-1.2 TA on exploration Lump Sum CQ 150.00 Post 2017 August 24, embedded within the 2018 NGSA Scoping analysis A3-1.1 and Lump Sum QCBS 400.00 Prior September November strategy development 1, 2017 25, 2018 to create the basis for reintroducing and/or providing vocational training to achieve excellence for the training of the Government's technical staff as well as private sector (national pole) Analyze and design A3-1.2 a Lump Sum CQ 180.00 Post November August 28, program to address 1, 2017 2018 the skill gap in the domestic mining industry Design and A3-1.3 implement Lump Sum IC 100.00 Post November April 30, partnership program 1, 2017 2018 between the MMSD, Nigerian universities, and the NGSA on selected topics Assess and A3-1.4 develop Lump Sum CQ 150.00 Post November November policy and strategy for 1, 2017 26, 2018 achieving local content in Nigerian mining sector A4-1.1 Update SESA and Lump Sum CQ 150.00 Post July 1, 2017 April 27, prepare action plan for 2018 implementation of recommendations May 1, A4-2.1 Phase 1: Address Lump Sum QCBS 250.00 Post 2017 October 28, potential medical 2018 geology issues arising from interaction between geological Contract Original Prior Expected Activit Procur or Estimated y List of Type Time Estimate Proposal Completio Contracts ement Post Submissio n # Based or (US$, n Type Review Dates thousands Lump Sum ) Dates background and its influence on the plants, animals, and humans to explore general mining- related health impacts. Support the June 1, A4-5.1 creation Lump Sum CQ 250.00 Post 2017 January 27, of opportunities for 2018 women and gender mainstreaming in the mining sector June 1, B1-1-3.1 Providing ASM Lump Sum QCBS 2,800.00 Prior 2017 November inventory, 28, 2018 operations/activitie s to assess scale and extent B3-1.2 Analyze economic Lump Sum QCBS 200.00 Post January 1, December drivers linking supply 2017 27, 2017 of industrial minerals with demand for construction and industrial materials; analyzing benefit sharing aspects (different stages of the value chain) institutional and governance. Needs assessment May 1, B3-1.3 and Lump Sum QCBS 4,120.00 Prior 2017 April 26, evaluation for 2018 accrediting and certifying laboratories including operationalization geological research laboratories December B3-1.4 Development of Lump Sum QCBS 500.00 Prior 1, November support action to 2017 26, 2018 improve the metallurgical and steel Inspectorate including an initial baseline study B4-1.1 Analysis and Lump Sum QCBS 540.00 Prior November October 27, development of 1, 2017 2018 strategies for addressing access to Contract Original Prior Expected Activit Procur or Estimated y List of Type Time Estimate Proposal Completio Contracts ement Post Submissio n # Based or (US$, n Type Review Dates thousands Lump Sum ) Dates finances constraints for local ASM, junior and medium scale companies Assess the SMDF B4-1.2 and Lump Sum QCBS 600.00 Prior March 1, November provide 2018 26, 2018 recommendations for its restructuring and operationalization, covering governance, structure, organization, strategies, and operations June 1, B4-1.3 Assist in building Lump Sum QCBS 600.00 Prior 2017 November capacity for financial 28, 2018 institutions, public and semipublic bodies through the Bankers Committee, in understanding of mining financing, preparation of bankable FS, business plans, and marketing June 1, B5-1.1 Initial review and Lump Sum QCBS 3,000.00 Prior 2017 November development of 28, 2018 potential assets in different mining cycle stages to select some Mineral Assets, and Mining Operators requiring Support, to bring those Assets to a higher Level or Advancing transactions on specific Assets. B5-1.2 Preliminary Lump Sum IC 40.00 Post November December identification of ‘proof 1, 2017 26, 2018 of concept’ investment May 1, February B5-2.1 Preliminary Lump Sum CQ 180.00 Post 2017 25, assessment and 2018 transaction advisory services for State Own Enterprise NIOMCO Consultancy May 1, A2-2.2 services Lump Sum IC 150.00 Post 2017 January 26, Contract Original Prior Expected Activit Procur or Estimated y List of Type Time Estimate Proposal Completio Contracts ement Post Submissio n # Based or (US$, n Type Review Dates thousands Lump Sum ) Dates for review of legal 2018 framework Consultancy May 1, A1-5.1 services Lump Sum IC 75.00 Post 2017 January 26, for identifying revenue 2018 leakages, strengthening the administrative system, and oversight of revenue assessment and collection Consultancy May 1, B5-1.1 service for Lump Sum IC 400.00 Prior 2017 January 26, identifying prospective 2018 mineral targets and mining assets to be analyzed as candidates for transaction processes and investment promotion. (Geological Analyst) Technical expert C1-1 for Lump Sum IC 600.00 Prior n.a. October 23, the project (1 and 2) 2018 Procurement Time C1-2 Specialist based IC 75.00 Post n.a. October 23, 2018 Time C1-3 M&E Specialist based IC 75.00 Post n.a. October 23, 2018 Time C1-4 Project Coordinator based IC 120.00 Post n.a. October 23, 2018 PMO (for C1-5 subsequent Lump Sum QCBS 1,500.00 Prior n.a. October 23, months) 2018 Note: IC = Individual Consultant; QCBS = Quality- and Cost-Based Selection; SS = Single- Source Selection. PROCUREMENT Nigeria : Nigeria: Mineral Sector Support for Economic Diversification Project (MinDiver) PLAN General Information Country: Nigeria 2018-02-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P159761 GPN Date: 2017-12-27 Project Name: Nigeria: Mineral Sector Support for Economic Diversification Project (MinDiver) Loan / Credit No: IDA / 59900, IDA / V0270 Mineral Sector Support for Economic Diversification Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NG-MINDIVER-107430-CW-R Facilitating Downstream Sec FQ / Refurbishment of Buildin Request for Quota Single Stage - One E 2020-01-0 IDA / 59900 tor Development & Enhancin Post Limited 25,000.00 26,267.17 Signed 2019-05-14 2019-05-10 2019-07-09 2019-06-20 g in JOS zones of the Mining tions nvelope 5 g Competitiveness Cadastre Office for online ap plication NG-MINDIVER-107432-CW-R FQ / MAIDUGURI, Refurbishm Facilitating Downstream Sec Request for Quota Single Stage - One E 2019-12-2 ent of Identified Building in 6 IDA / 59900 tor Development & Enhancin Post Limited 25,000.00 27,082.68 Completed 2019-04-29 2019-05-10 2019-06-24 2019-06-20 tions nvelope 1 Geopolitical zones of the Mini g Competitiveness ng Cadastre for Online applic ation NG-MINDIVER-107434-CW-R FQ / KADUNA: Refurbishment Facilitating Downstream Sec Request for Quota Single Stage - One E 2019-12-2 of the identified building in K IDA / 59900 tor Development & Enhancin Post Limited 25,000.00 28,187.06 Signed 2019-04-29 2019-05-10 2019-06-24 2019-06-20 tions nvelope 1 aduna Geopolitical area of th g Competitiveness e Mining Cadastre office for o nline application. NG-MINDIVER-107435-CW-R FQ / ENUGU: Refurbishment Facilitating Downstream Sec Request for Quota Single Stage - One E 2019-12-2 of the identified building in E IDA / 59900 tor Development & Enhancin Post Limited 25,000.00 34,144.43 Signed 2019-04-29 2019-06-10 2019-06-24 2019-06-20 tions nvelope 1 nugu Geopolitical area of the g Competitiveness Mining Cadastre office for onl ine application. MINDIVER/RFB/W-004/18 / C Establishing a Strong Found Single Stage - One E 2018-10-2 onstruction of feeder roads a IDA / 59900 ation for Mining Sector Deve Post Request for Bids Open - National 2,000,000.00 0.00 Canceled 2018-01-01 2018-01-06 2018-02-17 2018-03-19 2018-04-23 nvelope 0 nd bridges under proof of co lopment ncept NG-MINDIVER-107436-CW-R FQ / BENIN: Refurbishment of Facilitating Downstream Sec Request for Quota Single Stage - One E Under Imple 2020-04-0 the identified building in Beni IDA / 59900 tor Development & Enhancin Post Limited 60,000.00 0.00 2019-08-14 2019-05-17 2019-10-09 tions nvelope mentation 6 n Geopolitical area of the Min g Competitiveness ing Cadastre office for online application. NG-MINDIVER-107433-CW-R FQ / IBADAN: Refurbishment Facilitating Downstream Sec Request for Quota Single Stage - One E 2020-04-0 of the identified building in Ib IDA / 59900 tor Development & Enhancin Post Limited 50,000.00 41,825.32 Signed 2019-08-11 2019-05-10 2019-10-06 2019-06-20 tions nvelope 3 adan Geopolitical area of the g Competitiveness Mining Cadastre office for onl ine application. NG-MINDIVER-156832-CW-R Facilitating Downstream Sec FB / Renovation of National S Single Stage - One E 2020-11-2 IDA / 59900 tor Development & Enhancin Prior Request for Bids Limited 550,000.00 0.00 Canceled 2020-02-10 2020-02-15 2020-03-28 2020-04-27 2020-06-01 teel Raw Material and Explor nvelope 8 g Competitiveness ation Agency (NSRMEA), Kad una NG-MINDIVER-156221-CW-R FQ / Renovation of Server Ro oms at the Nigeria Geological Facilitating Downstream Sec Request for Quota Single Stage - One E Pending Imp 2020-05-2 Survey Agency (NGSA) and T IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 2020-02-12 2020-04-08 tions nvelope lementation 3 he National Steel Raw Materi g Competitiveness al and Exploration Agency (N SRMEA) for the delivery of Ni geria Geodata centre in both Location NG-MINDIVER-156372-CW-R Facilitating Downstream Sec Single Stage - One E 2020-11-2 FB / Renovation of National M IDA / 59900 tor Development & Enhancin Prior Request for Bids Limited 600,000.00 0.00 Canceled 2020-02-06 2020-02-11 2020-03-24 2020-04-23 2020-05-28 nvelope 4 etallurgical Development cen g Competitiveness tre (NMDC), Jos NG-MINDIVER-153-CW-RFB / Facilitating Downstream Sec Single Stage - One E 2020-07-0 Renovation of National Metall IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 700,000.00 0.00 Canceled 2019-09-15 2019-09-20 2019-11-01 2019-12-01 2020-01-05 nvelope 3 urgy Development Centre (N g Competitiveness MDC) – Jos. MINDIVER/RFB/W-001/18 / R Facilitating Downstream Sec Single Stage - One E 2018-10-2 enovation of Labouratory (N IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 500,000.00 0.00 Canceled 2018-01-01 2018-01-06 2018-02-17 2018-03-19 2018-04-23 nvelope 0 GSA Kaduna) g Competitiveness NG-MINDIVER-156373-CW-R Facilitating Downstream Sec FB / Renovation of Laborator Single Stage - One E 2021-01-2 IDA / 59900 tor Development & Enhancin Prior Request for Bids Limited 550,000.00 0.00 Canceled 2020-02-10 2020-02-15 2020-03-28 2020-04-27 2020-06-01 y for Nigeria Geological Surv nvelope 7 g Competitiveness ey Agency (NGSA) Laborator y, Kaduna. NG-MINDIVER-156374-CW-R Facilitating Downstream Sec Single Stage - One E 2021-01-3 FB / Renovation of Nigeria Ins IDA / 59900 tor Development & Enhancin Prior Request for Bids Limited 630,000.00 0.00 Canceled 2020-02-13 2020-02-18 2020-03-31 2020-04-30 2020-06-04 nvelope 0 titute of Mining and Geoscien g Competitiveness ces (NIMG), Jos MINDIVER/RFB/W-003/18 / C Facilitating Downstream Sec Single Stage - One E 2018-10-2 ompletion of the dimension s IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 500,000.00 0.00 Canceled 2018-01-01 2018-01-06 2018-02-17 2018-03-19 2018-04-23 nvelope 0 tone labouratory in Kaduna g Competitiveness NG-MINDIVER-167847-CW-R Facilitating Downstream Sec FB / Renovation of National S Single Stage - One E Under Imple 2021-03-2 IDA / 59900 tor Development & Enhancin Post Request for Bids Limited 550,000.00 0.00 2020-04-10 2020-04-20 2020-04-15 2020-05-27 2020-06-26 2020-07-31 teel Raw Material and Explor nvelope mentation 8 g Competitiveness ation Agency (NSRMEA) – Ka dunA. NG-MINDIVER-167848-CW-R Facilitating Downstream Sec FB / Renovation of Nigeria Ge Single Stage - One E Under Imple 2021-04-0 IDA / 59900 tor Development & Enhancin Post Request for Bids Limited 550,000.00 0.00 2020-04-17 2020-05-08 2020-04-22 2020-06-03 2020-07-03 2020-08-07 ological Survey Agency Labo nvelope mentation 4 g Competitiveness uratory (NGSA Kaduna) NG-MINDIVER-167849-CW-R Facilitating Downstream Sec Single Stage - One E Under Imple 2021-03-2 FB / Renovation of National M IDA / 59900 tor Development & Enhancin Post Request for Bids Limited 600,000.00 0.00 2020-04-10 2020-04-08 2020-04-15 2020-05-27 2020-06-26 2020-07-31 nvelope mentation 8 etallurgy Development Centr g Competitiveness e (NMDC) – Jos. NG-MINDIVER-167850-CW-R Facilitating Downstream Sec Single Stage - One E Under Imple 2021-03-3 FB / Renovation of Nigerian I IDA / 59900 tor Development & Enhancin Post Request for Bids Limited 630,000.00 0.00 2020-04-13 2020-03-31 2020-04-18 2020-05-11 2020-05-30 2020-06-29 2020-08-03 nvelope mentation 1 nstitute of Mining and Geosci g Competitiveness ences (NIMG), Jos Page 1 NG-MINDIVER-168710-CW-R FQ / Renovation of facilities f Facilitating Downstream Sec Request for Quota Single Stage - One E Pending Imp 2020-12-2 or the training of candidates IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 2020-04-28 2020-06-23 tions nvelope lementation 0 for the development of Gems g Competitiveness tone and Jewellery industry. NG-MINDIVER-103111-CW-R Facilitating Downstream Sec Single Stage - One E 2020-03-0 FB / Rehabilitation of Ladi Kw IDA / 59900 tor Development & Enhancin Post Request for Bids Limited 70,000.00 0.00 Canceled 2019-05-16 2019-05-21 2019-07-02 2019-08-01 2019-09-05 nvelope 3 ali Centre on Poetry Works g Competitiveness NG-MINDIVER-174609-CW-DI R / Installation of Fire Assay Establishing a Strong Found 2021-01-1 Equipment and training at th IDA / 59900 ation for Mining Sector Deve Post Direct Selection Direct 50,000.00 72,587.23 Signed 2020-05-27 2020-07-24 2020-06-10 2020-07-27 2020-07-15 2020-09-18 1 e NIGERIAN Geological Surve lopment y Agency Laboratory (NGSA), Kaduna. NG-MINDIVER-216691-CW-R FQ / Renovation of 2nd Buildi Facilitating Downstream Sec ng at the Gemstone and Jewe Request for Quota Single Stage - One E Under Imple 2021-10-1 IDA / 59900 tor Development & Enhancin Post Limited 45,000.00 0.00 2021-02-20 2021-04-17 llery, centre, Abuja for the tr tions nvelope mentation 4 g Competitiveness aining of candidates for the g emstone and jewellery activit y NG-MINDIVER-211936-CW-R Facilitating Downstream Sec FB / Partial renovation of the Single Stage - One E 2021-11-1 IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 500,000.00 0.00 Canceled 2021-01-26 2021-01-31 2021-03-14 2021-04-13 2021-05-18 facilities and infrastructure at nvelope 4 g Competitiveness Ladi Kwali Pottery Site, Sulej a NG-MINDIVER-250850-CW-R Facilitating Downstream Sec Request for Bids - FB / Partial renovation of the Single Stage - One E Pending Imp 2022-09-0 IDA / 59900 tor Development & Enhancin Post Request for Bids Limited Works SPD (after 500,000.00 0.00 2021-09-20 2021-09-25 2021-11-06 2021-12-06 2022-01-10 facilities and infrastructure at nvelope lementation 7 g Competitiveness prequalification) Ladi Kwali Pottery Site, Sulej a NG-MINDIVER-278341-CW-R FB / Renovation of further wo Request for Bids - rks at the National Institute o Establishing a Strong Found Single Stage - One E Small Works SPD Under Imple 2022-12-2 f Mining and Geosciences, (NI IDA / 59900 ation for Mining Sector Deve Post Request for Bids Open - National 1,200,000.00 0.00 2022-04-10 2022-12-05 2022-04-17 2022-12-07 2022-05-17 2022-05-27 2022-07-01 nvelope (1 envelope proce mentation 8 MG) Jos (LOT 1) and Remodel lopment ss) ling of Modern Core Shed for the National Geological Surv ey Agency, Kaduna. (LOT 2) NG-MINDIVER-361479-CW-R Facilitating Downstream Sec Request for Quota FQ / Security Reinforcement Request for Quota Single Stage - One E Pending Imp 2024-01-1 IDA / 59900 tor Development & Enhancin Post Limited tions (Non Bank-S 50,000.00 0.00 2023-05-22 2023-07-17 of Ibadan Gemstone and Jew tions nvelope lementation 3 g Competitiveness PD) elry market center GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MINDIVER/GO/RFQ/001/18 / Project Management and Co Request for Quota Single Stage - One E Procurement of Office Equip IDA / 59900 Post Limited 100,000.00 67,232.55 Completed 2018-02-10 2018-06-25 2018-04-07 2018-08-01 2018-10-04 2018-09-24 ordination tions nvelope ment for MinDiver Project us e MINDIVER/GO/RFQ/004/18 / Project Management and Co Project Management Server, IDA / 59900 Post Direct Selection Direct 65,000.00 0.00 Canceled 2018-04-15 2018-04-20 2018-06-08 2018-12-05 ordination Softwares and Hardwares MINDIVER/GO/RFQ/007/17 / Establishing a Strong Found Request for Quota Single Stage - One E Procurement of Office Furnitu IDA / 59900 ation for Mining Sector Deve Post Limited 100,000.00 60,921.44 Signed 2018-02-20 2018-06-25 2018-04-24 2019-12-03 2018-10-21 tions nvelope re for MinDiver Project lopment MINDIVER/GO/RFB/008/18 / Establishing a Strong Found Procurement of Office Furnitu Single Stage - One E IDA / 59900 ation for Mining Sector Deve Post Request for Bids Open - National 400,000.00 0.00 Canceled 2018-02-10 2018-02-15 2018-03-29 2018-04-28 2018-06-02 2018-11-29 re for Mining Cadastre office nvelope lopment (MCO) -6 Geopolitical Zones MINDIVER/GO/RFQ/008/18 / Establishing a Strong Found Request for Quota Single Stage - One E Pending Impl Supply and Installation of ICT IDA / 59900 ation for Mining Sector Deve Post Limited 100,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 tions nvelope ementation equipment for MinDiver Proje lopment ct Office MINDIVER/NCB/G-007/18 / S Facilitating Downstream Sec Single Stage - One E Under Imple upply and Installation of ICT IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 400,000.00 0.00 2018-02-15 2019-05-17 2018-03-01 2018-04-12 2019-07-15 2018-05-12 2019-08-01 2018-06-16 2018-12-13 nvelope mentation equipment for 6 Geopolitical g Competitiveness Zones of the MCO MINDIVER/GO/RFQ/005/18 / Project Management and Co Request for Quota Single Stage - One E Procurement of Stationeries IDA / 59900 Post Limited 100,000.00 13,783.60 Signed 2018-03-01 2018-03-13 2018-04-26 2018-11-09 2018-10-23 ordination tions nvelope and Printing materials for Min diver Project office MINDIVER/GO/RFB/006/18 / Procurement of Office Equip Establishing a Strong Found Single Stage - One E ment, Stationeries and Printi IDA / 59900 ation for Mining Sector Deve Post Request for Bids Open - National 600,000.00 0.00 Canceled 2018-04-01 2018-04-15 2018-05-27 2018-06-26 2018-07-31 2019-01-27 nvelope ng materials for 6 Geopolitic lopment al Zones of the Mining Cadas tre Office MINDIVER/GO/RFQ/014/18 / Facilitating Downstream Sec Request for Quota Single Stage - One E Solar Panel system for NGSA, IDA / 59900 tor Development & Enhancin Post Limited 95,000.00 82,362.76 Signed 2018-03-15 2019-05-30 2018-05-10 2019-07-28 2018-11-06 tions nvelope Kaduna g Competitiveness MINDIVER/GO/RFB/005/18 / Facilitating Downstream Sec Single Stage - One E Laboratory Equipment for NG IDA / 59900 tor Development & Enhancin Prior Request for Bids Open - National 1,500,000.00 2,985,098.37 Signed 2018-03-15 2019-06-24 2018-03-20 2018-05-01 2019-09-12 2018-05-31 2020-01-29 2018-07-05 2020-03-19 2019-01-01 nvelope SA Kaduna g Competitiveness MINDIVER/RFQ/G-004/18 / Pr Facilitating Downstream Sec ocurement of Motor Vehicles Request for Quota Single Stage - One E IDA / 59900 tor Development & Enhancin Post Limited 500,000.00 471,052.40 Completed 2018-02-15 2018-03-29 2018-04-19 2018-04-26 2018-10-16 2018-06-26 for Project office -Saloon Cars tions nvelope g Competitiveness (4NOS), 4X4 (1Nos) MINDIVER/RFQ/GD-016/18 / Establishing a Strong Found Procurement of Hardware up Request for Quota Single Stage - One E Pending Impl IDA / 59900 ation for Mining Sector Deve Post Limited 100,000.00 0.00 2018-02-20 2018-04-17 2018-10-14 grade for Information Manag tions nvelope ementation lopment ement System at the NGSA ( DSS, Exploration, IT) MINDIVER/RFQ/GD-078/18 / Establishing a Strong Found Request for Quota Single Stage - One E Procurement of Topographic IDA / 59900 ation for Mining Sector Deve Post Limited 50,000.00 48,377.13 Completed 2018-09-05 2018-08-16 2018-10-31 2018-09-19 2019-04-29 2018-09-24 tions nvelope al Maps covering the entire c lopment ountry, Nigeria Page 2 MINDIVER/GO/RFQ/108/19 / Project Management and Co Request for Quota Single Stage - One E Pending Impl Procurement of Office Furnitu IDA / 59900 Post Limited 20,000.00 0.00 2019-04-20 2019-06-15 2019-12-12 ordination tions nvelope ementation re for PMO (MindIVER) MINDIVER/GO/RFB/102/19 / Procurement and installation Project Management and Co Request for Quota Single Stage - One E of Manual Shelving/Rack syst IDA / 59900 Post Limited 25,000.00 21,604.91 Signed 2019-03-20 2019-05-28 2019-05-15 2019-08-01 2019-11-11 ordination tions nvelope em for safekeping of docume nts for MinDiverProcurement unit) MINDIVER/GO/RFQ/104/19 / Facilitating Downstream Sec Request for Quota Single Stage - One E Under Imple Printing of NGSA Technical R IDA / 59900 tor Development & Enhancin Post Limited 50,000.00 0.00 2019-08-20 2019-10-15 2020-04-12 tions nvelope mentation eports and Manuals g Competitiveness NG-MINDIVER-103110-GO-R Project Management and Co Request for Quota Single Stage - One E Under Imple FQ / Procurement of office Eq IDA / 59900 Post Limited 20,000.00 0.00 2019-08-06 2019-10-14 2019-10-01 2020-03-29 ordination tions nvelope mentation uipment for Mindiver project NG-MINDIVER-104557-GO-R Facilitating Downstream Sec FB / Procurement of Solar Pa Single Stage - One E IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 150,000.00 129,107.70 Signed 2019-05-01 2019-06-05 2019-05-06 2019-07-19 2019-06-17 2019-08-15 2019-07-17 2019-11-14 2019-08-21 2019-11-29 2020-02-17 nel System for 6 Zonal office nvelope g Competitiveness s of the Mining Cadastre Offic e (MCO) MINDIVER/GO/RFQ/003/17 / Facilitating Downstream Sec Procurement of 4X4 wheel dr Single Stage - One E Under Imple IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 1,200,000.00 0.00 2019-05-24 2019-05-17 2019-05-29 2019-07-10 2019-07-10 2019-08-09 2019-07-14 2019-09-13 2020-03-11 ive Double cabin pick-up vehi nvelope mentation g Competitiveness cles MCO 6/ASM 2/M1 2/SMD F 1 /Metal and Steel 1 MINDIVER/RFB/GO/021-18 / Procurement and installation of Laboratory Equipment for Facilitating Downstream Sec Open - Internationa Single Stage - One E Nigerian Metallurgical and De IDA / 59900 tor Development & Enhancin Prior Request for Bids 1,700,000.00 1,528,118.75 Signed 2019-05-25 2019-08-04 2019-05-30 2019-08-06 2019-07-11 2019-09-23 2019-08-10 2020-02-24 2019-09-14 2020-05-21 2020-03-12 l nvelope velopment Centre (NMDC),Jo g Competitiveness s and Nigerian INSTITUTE of MINING and Geosciences (NI MG), Jos . MINDIVER/GO/RFB/106/19 / Procurement and installation Facilitating Downstream Sec Single Stage - One E of Laboratory Equipment for IDA / 59900 tor Development & Enhancin Prior Request for Bids Open - National 500,000.00 0.00 Canceled 2019-05-01 2019-05-06 2019-06-17 2019-07-17 2019-08-21 2020-02-17 nvelope Nigerian INSTITUTE of MININ g Competitiveness G and Geosciences (NIMG) NG-MINDIVER-115030-GO-R Facilitating Downstream Sec FQ / Procurement of 45kva S Request for Quota Single Stage - One E IDA / 59900 tor Development & Enhancin Post Limited 90,000.00 83,951.17 Signed 2019-06-12 2019-05-30 2019-08-07 2019-07-08 2020-02-03 olar/inverter system for the tions nvelope g Competitiveness Mining Cadastre Office (CO)H eadquarters, Abuja NG-MINDIVER-115033-GO-R Facilitating Downstream Sec FQ / Procurement of Furnitur Request for Quota Single Stage - One E IDA / 59900 tor Development & Enhancin Post Limited 75,000.00 72,231.77 Signed 2019-06-07 2019-05-28 2019-08-02 2019-07-08 2020-01-29 e for the Solid Mineral Develo tions nvelope g Competitiveness pment Fund (SMDF) NG-MINDIVER-119247-GO-R Facilitating Downstream Sec FQ / Procurement of IT and C Request for Quota Single Stage - One E Under Imple IDA / 59900 tor Development & Enhancin Post Open - National 100,000.00 0.00 2019-08-02 2019-09-27 2020-03-25 ommunication Equipment for tions nvelope mentation g Competitiveness Solid Mineral Development F und (SMDF) MINDIVER/RFQ/GO/008/18 / Establishing a Strong Found Procurement of Office Furnitu Request for Quota Single Stage - One E Under Imple IDA / 59900 ation for Mining Sector Deve Post Limited 100,000.00 0.00 2019-08-02 2019-04-18 2019-09-27 2020-03-25 re for Mining Cadastre office tions nvelope mentation lopment (MCO) -6 Geopolitical Zones NG-MINDIVER-144-GO-RFQ / Facilitating Downstream Sec Procurement of Furniture for Request for Quota Single Stage - One E IDA / 59900 tor Development & Enhancin Post Limited 35,000.00 29,034.52 Signed 2019-08-30 2019-07-23 2019-10-25 2019-08-30 2020-04-22 training on Remote sensing f tions nvelope g Competitiveness or the Formalisation of ASM NG-MINDIVER-154-GO-RFB / Procurement of Jewellery ma Facilitating Downstream Sec Open - Internationa Single Stage - One E king and Gemmology Equipm IDA / 59900 tor Development & Enhancin Prior Request for Bids 500,000.00 1,751,693.77 Signed 2019-08-20 2019-10-22 2019-08-25 2019-11-27 2019-10-06 2020-01-14 2019-11-05 2020-10-05 2019-12-10 2020-11-01 2020-06-07 l nvelope ent for the Development of t g Competitiveness he Gemstone and Jewellery I ndustry NG-MINDIVER-143-GO-RFQ / Facilitating Downstream Sec Procurement of Equipment fo Request for Quota Single Stage - One E IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 85,794.05 Signed 2019-09-30 2019-07-19 2019-11-25 2019-08-28 2019-12-25 r Remote sensing in the Form tions nvelope g Competitiveness alisation of Artisanal Miners- Phase 1 MINDIVER/GO/RFB/013/18 / Procurement of 6 nos tableto Facilitating Downstream Sec Single Stage - One E Under Imple p X-ray Fluorescence (XRF) IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 600,000.00 0.00 2019-09-25 2019-10-18 2019-10-09 2019-11-18 2019-11-20 2020-01-28 2019-12-20 2020-01-24 2020-07-22 nvelope mentation machine and 20 nos handhel g Competitiveness d X-ray Fluorescence (XRF) a nalysers for exit ports. MINDIVER/GO/RFB/011/17 / Facilitating Downstream Sec Single Stage - One E XRF Analyzer X-Ray machine IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 300,000.00 0.00 Canceled 2018-03-15 2018-03-29 2018-05-10 2018-06-09 2018-07-14 2019-01-10 nvelope s for exit Ports (10) g Competitiveness NG-MINDIVER-128956-GO-DI R / Procurement of Arc GIS S Facilitating Downstream Sec oftware for utilisation of the IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 150,000.00 83,887.20 Completed 2019-09-30 2019-09-13 2019-10-05 2019-09-18 2019-11-09 2019-10-17 2019-12-09 2019-11-20 Remote sensing system for t g Competitiveness he Formalisation of Artisanal miners. NG-MINDIVER-137-GO-RFQ / Facilitating Downstream Sec Request for Quota Single Stage - One E Procurement of Thematic Ma IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 Canceled 2019-08-25 2019-10-20 2019-12-19 tions nvelope ps for restricted areas of the g Competitiveness Country. NG-MINDIVER-136-GO-RFQ / Facilitating Downstream Sec Acquisition, Georeferencing a Request for Quota Single Stage - One E IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 Canceled 2019-09-14 2019-11-09 2020-05-07 nd Geocoding of Topographic tions nvelope g Competitiveness maps for the country. NG-MINDIVER-134539-GO-R Facilitating Downstream Sec FB / Procurement of I.T Equip Single Stage - One E IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 250,000.00 267,614.68 Signed 2019-09-30 2019-10-07 2019-10-14 2019-10-07 2019-11-25 2019-12-03 2019-12-25 2020-01-09 2020-01-29 2020-02-29 2020-07-27 ment to support the Nigeria nvelope g Competitiveness Geodata Centre at the NGSA and NSRMEA Kaduna MINDIVER/GO/RFQ/004/19 / Project Management and Co Request for Quota Single Stage - One E Pending Impl Procurement of Project Mana IDA / 59900 Post Limited 65,000.00 0.00 2019-09-30 2019-11-25 2020-05-23 ordination tions nvelope ementation gement Server, Softwares an d Hardware. Page 3 NG-MINDIVER-115035-GO-R Facilitating Downstream Sec FB / Procurement of IT and C Single Stage - One E IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 200,000.00 0.00 Canceled 2019-06-03 2019-06-08 2019-07-20 2019-08-19 2019-09-23 2020-03-21 ommunication Equipment for nvelope g Competitiveness Solid Mineral Development F und (SMDF) MINDIVER/GO/RFQ/107/19 / Project Management and Co Request for Quota Single Stage - One E Under Imple Procurement of office Station IDA / 59900 Post Limited 50,000.00 0.00 2020-04-05 2020-07-03 2020-05-31 2020-06-30 ordination tions nvelope mentation ery amd printing supplies for MinDiver Project NG-MINDIVER-165410-GO-R Project Management and Co Request for Quota Single Stage - One E Under Imple FQ / Procurement of office eq IDA / 59900 Post Limited 50,000.00 0.00 2020-04-20 2020-06-15 2020-07-30 ordination tions nvelope mentation uipment for Mindiver Project (2020) NG-MINDIVER-168709-GO-R FB / Procurement of Equipme Facilitating Downstream Sec Open - Internationa Single Stage - One E Under Imple nt for Remote sensing activit IDA / 59900 tor Development & Enhancin Post Request for Bids 350,000.00 0.00 2020-04-27 2020-06-16 2020-05-02 2020-06-16 2020-06-13 2020-07-29 2020-07-13 2020-08-17 2021-02-13 l nvelope mentation y under the Formalization of g Competitiveness Artisanal Miners activity. NG-MINDIVER-168711-GO-R FQ / Procurement of Goods a Facilitating Downstream Sec Request for Quota Single Stage - One E Under Imple nd IT Equipment for the Train IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 2020-04-29 2020-04-22 2020-06-24 2020-07-24 tions nvelope mentation ing facilities at the Gemstone g Competitiveness and Jewellery centre, Abuja NG-MINDIVER-168713-GO-R FB / Procurement of Accessor Facilitating Downstream Sec Open - Internationa Single Stage - One E Under Imple ies for PM 6 Auto precision L IDA / 59900 tor Development & Enhancin Post Request for Bids 350,000.00 0.00 2020-04-21 2020-06-17 2020-04-26 2020-06-19 2020-06-07 2020-07-31 2020-07-07 2020-08-11 2021-02-07 l nvelope mentation apping and polishing machin g Competitiveness e for the National Metallurgic al Development Centre, Jos MINDIVER/GO/RFB/012/18 / Facilitating Downstream Sec Single Stage - One E Equiping of the dimension st IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 300,000.00 0.00 Canceled 2018-02-15 2018-02-20 2018-04-03 2018-05-03 2018-06-07 2019-06-07 nvelope one laboratory in Kaduna g Competitiveness NG-MINDIVER-128949-GO-R FQ / Procurement of IT infrast Facilitating Downstream Sec Request for Quota Single Stage - One E ructure and Data Systems at IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 Canceled 2019-09-10 2019-11-05 2020-01-04 tions nvelope the Nigeria Geological Surve g Competitiveness y Agency for the automation information system NG-MINDIVER-134-GO-RFQ / Facilitating Downstream Sec Request for Quota Single Stage - One E Procurement of Goods and Li IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 Canceled 2019-09-05 2019-10-31 2020-04-28 tions nvelope cences for the MMSD portal s g Competitiveness olution. NG-MINDIVER-184755-GO-DI R / Enhancement of internet Project Management and Co Pending Impl IDA / 59900 Post Direct Selection Direct 50,000.00 0.00 2020-07-21 2020-07-28 2020-09-06 2021-09-01 Bandwidth subscription for M ordination ementation indiver Project from 20mbps to 100mbps NG-MINDIVER-184758-GO-R FQ / Procurement of Statione Facilitating Downstream Sec Request for Quota Single Stage - One E Pending Impl ries and Security Printing ma IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 2020-08-07 2020-10-02 2021-03-31 tions nvelope ementation terials for the Headquarters a g Competitiveness nd 6 Zonal Offices of the Mini ng Cadastre Office (MCO) MINDIVER/GO/RFB/306/18 / / Procurement of Office Equip Facilitating Downstream Sec ment, Stationeries and Printi Single Stage - One E IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 300,000.00 0.00 Canceled 2019-03-21 2019-03-26 2019-05-07 2019-06-06 2019-07-11 2020-01-07 ng materials for Headquarter nvelope g Competitiveness s and 6 Geopolitical Zones of the Mining Cadastre Office ( MCO) NG-MINDIVER-184760-GO-R FQ / Procurement of Solar Sy stem for the Nigeria Geologic Facilitating Downstream Sec al Survey Agency (NGSA) Ab Request for Quota Single Stage - One E Pending Impl IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 2020-08-06 2020-10-01 2021-03-30 uja, Kaduna, and NationaL St tions nvelope ementation g Competitiveness eel Raw Material Agency (NS RMEA)Kaduna for the implem entation of the Nigeria Geoda ta centre. NG-MINDIVER-184766-GO-R Facilitating Downstream Sec FQ / Procurement & Installati Request for Quota Single Stage - One E Pending Impl IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 2020-07-25 2020-09-19 2021-03-18 on of Fire safety equipment f tions nvelope ementation g Competitiveness or the Mindiver Project office NG-MINDIVER-184764-GO-R FQ / Procurement of Internet Bandwidth for NGSA Abuja (1 00mbps Primary & 50 Mbps s Facilitating Downstream Sec Request for Quota Single Stage - One E Under Imple econdary), NGSA Kaduna (50 IDA / 59900 tor Development & Enhancin Post Limited 250,000.00 0.00 2020-07-27 2020-08-07 2020-09-21 2021-03-20 tions nvelope mentation mbps Primary & 20 Mbps sec g Competitiveness ondary) and NSRMEA (50mb ps Primary & 20 Mbps secon dary) for the Nigeria Geodata centres at these locations. MINDIVER/GO/RFB/009/19 / Establishing a Strong Found Open - Internationa Single Stage - Two E Procurement of efficient Tech IDA / 59900 ation for Mining Sector Deve Prior Request for Bids 1,200,000.00 0.00 Canceled 2019-06-05 2019-06-10 2019-07-22 2019-10-04 2019-11-08 2020-05-06 l nvelope nology Equipmemt for safer lopment and Cleaner Mining NG-MINDIVER-211940-GO-R Facilitating Downstream Sec FQ / Procurement of simple p Request for Quota Single Stage - One E Under Imple IDA / 59900 tor Development & Enhancin Post Limited 70,000.00 0.00 2021-02-12 2021-05-17 2021-04-09 2021-07-08 ottery-making equipment for tions nvelope mentation g Competitiveness training at Ladi Kwali Pottery centre NG-MINDIVER-211941-GO-R Facilitating Downstream Sec FB / Procurement of modern Single Stage - One E Under Imple IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 400,000.00 0.00 2021-01-28 2021-04-11 2021-02-11 2021-04-19 2021-03-25 2021-04-24 2021-05-29 2021-11-25 and mechanized equipment f nvelope mentation g Competitiveness or the Ladi Kwali pottery cent re. NG-MINDIVER-211118-GO-R FQ / Procurement and Install Facilitating Downstream Sec ation Equipment at the Gems Request for Quota Single Stage - One E Under Imple IDA / 59900 tor Development & Enhancin Post Limited 40,000.00 0.00 2021-03-01 2021-04-26 2021-07-25 tone and Jewellery, centre, A tions nvelope mentation g Competitiveness buja for the training of candi dates for THE gemstone and jewellery activity NG-MINDIVER-211116-GO-R Facilitating Downstream Sec FB / Procurement of equipme Single Stage - One E Under Imple IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 650,000.00 0.00 2021-02-15 2021-04-15 2021-02-20 2021-04-15 2021-04-03 2021-06-03 2021-05-03 2021-08-13 2021-06-07 2021-12-04 nt for the development of the nvelope mentation g Competitiveness gemstone market in southwe st Nigeria Page 4 NG-MINDIVER-216703-GO-R FQ / Procurement of 3nos Vid eo Conferencing Equipment f Facilitating Downstream Sec or the Ministers Conference Request for Quota Single Stage - One E Pending Impl IDA / 59900 tor Development & Enhancin Post Limited 46,000.00 0.00 2021-03-21 2021-05-16 2021-07-15 Room at the Ministry of Mine tions nvelope ementation g Competitiveness s and Steel Development (M MSD), Mining Cadastre Office (MCO) Conference Room, an d NGSA, Abuja Conference R oom NG-MINDIVER-234530-GO-R FB / Procurement and Installa tion of modern technical and Facilitating Downstream Sec Single Stage - One E Under Imple logistics equipment and tools IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 250,000.00 0.00 2021-07-25 2022-03-08 2021-07-30 2022-03-09 2021-09-10 2022-04-19 2021-10-10 2022-05-10 2021-11-14 2022-05-13 nvelope mentation for the Mines Inspectorate De g Competitiveness partment of the Ministry of M ines and Steel Development ( MMSD) NG-MINDIVER-234526-GO-R FQ / Procurement and install Facilitating Downstream Sec Request for Quota Single Stage - One E Pending Impl ation of 2nos of professional IDA / 59900 tor Development & Enhancin Post Limited 45,000.00 0.00 2021-07-30 2021-09-24 2022-03-23 tions nvelope ementation Large format scanner for the g Competitiveness NGSA/NSRMEA Geodata Cent re NG-MINDIVER-250851-GO-R FQ / Procurement of 1nos 4X Project Management and Co Request for Quota Single Stage - One E Under Imple IDA / 59900 Post Limited 130,000.00 0.00 2021-09-12 2021-11-07 2022-02-05 4 Wheel drive vehicle for Sup ordination tions nvelope mentation ervision and Monitoring of Pr ojects activities NG-MINDIVER-278371-GO-R FB / Procurement of 6 nos of Double cabin Motor vehicle f Facilitating Downstream Sec or NGSA for the supervision o Single Stage - One E Under Imple IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 800,000.00 0.00 2022-03-15 2022-04-01 2022-03-20 2022-04-08 2022-05-01 2022-05-11 2022-05-31 2022-07-05 2023-01-01 f Airborne Geophysical works nvelope mentation g Competitiveness , Geochemical and Topo map s works including Procureme nt of 1nos 30-seater minibus to support the NIMG. NG-MINDIVER-278435-GO-R FQ / Procurement of Statione Project Management and Co Request for Quota Single Stage - One E Pending Impl IDA / 59900 Post Limited 75,000.00 0.00 2022-02-20 2022-04-17 2022-06-16 ry and office equipment and I ordination tions nvelope ementation T Consumables for Mindiver f or yr2022-2023) NG-MINDIVER-278436-GO-R FQ / Printing and Binding of P Project Management and Co Request for Quota Single Stage - One E Pending Impl IDA / 59900 Post Limited 35,000.00 0.00 2022-09-06 2022-11-01 2022-12-31 roject’s activity Reports for cl ordination tions nvelope ementation osure. (Final Reports) NG-MINDIVER-278445-NC-RF B / Engagement of a Consulti ng Firm to undertake the Des ign, Development and Opera Facilitating Downstream Sec Single Stage - One E Pending Impl tionalization of an Environme IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 950,000.00 0.00 2022-03-30 2022-04-04 2022-05-16 2022-06-15 2022-07-20 2023-01-16 nvelope ementation ntal Information System inclu g Competitiveness ding Procurement of Informat ion and Communication Tech nology system for the Ministr y of Mines and Steel Develop ment (MM NG-MINDIVER-280369-GO-R FB / Procurement of goods an Establishing a Strong Found Single Stage - One E Under Imple d equipment to carry out Geo IDA / 59900 ation for Mining Sector Deve Post Request for Bids Open - National 900,000.00 0.00 2022-03-15 2022-05-25 2022-03-20 2022-05-25 2022-05-01 2022-05-31 2022-07-05 2023-01-01 nvelope mentation chemical mapping of selecte lopment d areas under the proof of co ncept in Nigeria. NG-MINDIVER-277985-GO-R FB / Procurement and Installa Establishing a Strong Found tion of Laboratory Equipment Open - Internationa Single Stage - One E IDA / 59900 ation for Mining Sector Deve Post Request for Bids 2,500,000.00 0.00 Canceled 2022-03-01 2022-03-06 2022-04-05 2022-04-08 2022-04-29 2022-10-26 for the ISO Certification of th l nvelope lopment e National Geological Survey Laboratory (NGRL), Kaduna. I ncl Training NG-MINDIVER-289161-GO-R FB / Procurement and Installa Establishing a Strong Found tion of Laboratory equipment Under Imple IDA / 59900 ation for Mining Sector Deve Post Direct Selection Direct 2,500,000.00 0.00 2022-04-24 2022-05-05 2022-05-22 2022-05-17 2022-07-01 2022-12-28 for the ISO Certification of th mentation lopment e National Geological Survey Laboratory (NGRL), Kaduna. I ncl Training. NG-MINDIVER-315215-GO-DI R / Procurement of basic jew Facilitating Downstream Sec elry-making tools (Starter Pa Under Imple IDA / 59900 tor Development & Enhancin Post Direct Selection Direct - National 264,000.00 0.00 2022-09-15 2022-09-08 2022-09-20 2022-09-21 2022-10-25 2022-12-24 ck) for the 1st and 2nd Batch mentation g Competitiveness of graduates of the Master Tr aining in Jewellery making an d design. NG-MINDIVER-361258-GO-R Facilitating Downstream Sec FQ / Procurement of 150KVA Request for Quota Single Stage - One E Pending Impl IDA / 59900 tor Development & Enhancin Post Limited 35,000.00 0.00 2023-05-20 2023-07-15 2024-01-11 soundproof, Diesel-powered tions nvelope ementation g Competitiveness Generator for the mining cad astre office. NG-MINDIVER-361291-GO-DI Facilitating Downstream Sec R / Procurement of starter kit Pending Impl IDA / 59900 tor Development & Enhancin Post Direct Selection Direct - National 185,000.00 0.00 2023-05-15 2023-05-20 2023-06-24 2023-12-21 for Batch 3 trainees on Gems ementation g Competitiveness tone and jewelry making. 30 trainees- NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MINDIVER/NC/RFP/105/19 / A irborne Geophysical Survey o Establishing a Strong Found f selected areas under proof Request for Propo Open - Internationa Single Stage - Two E IDA / 59900 ation for Mining Sector Deve Prior 4,500,000.00 0.00 Canceled 2019-05-23 2019-05-28 2019-07-09 2019-09-21 2019-10-26 2020-04-23 of concept programme- High sals l nvelope lopment resolution magnetic & Radio metric. Areas A-1, A-2 and c- 1 (100 sheets (TLM50 (38-32 NG-MINDIVER-103087-NC-RF P / Production of Topographic Establishing a Strong Found Mapping (Geodata Base) usin Request for Propo Open - Internationa Single Stage - Two E IDA / V0270 ation for Mining Sector Deve Prior 4,000,000.00 0.00 Canceled 2019-05-22 2019-05-27 2019-07-08 2019-09-20 2019-10-25 2020-04-22 g international Standards (M sals l nvelope lopment GCPOVmap2) for Areas A-1 , A-2 and c-1 (100 sheets (TLM 50 (38-32percent. Page 5 NG-MINDIVER-107437-NC-RF B / Airborne Geophysical Sur Facilitating Downstream Sec vey of selected areas under Open - Internationa Single Stage - One E IDA / 59900 tor Development & Enhancin Prior Request for Bids 10,000,000.00 0.00 Canceled 2019-04-21 2019-12-15 2019-05-12 2020-01-15 2019-06-23 2019-07-23 2019-08-27 2020-02-23 proof of concept programme- l nvelope g Competitiveness High resolution magnetic & R adiometric. Areas A-1 , A-2 a nd c-1 (100 sheets (TLM50 ) NG-MINDIVER-107438-NC-RF B / Production of Topographic Facilitating Downstream Sec Mapping (Geodata Base) usin Open - Internationa Single Stage - One E IDA / 59900 tor Development & Enhancin Prior Request for Bids 4,000,000.00 0.00 Canceled 2019-07-31 2019-12-15 2019-08-21 2019-10-02 2019-11-01 2019-12-06 2020-06-03 g international Standards (M l nvelope g Competitiveness GCPOVmap2) for Areas A-1 , A-2 and c-1 (100 sheets (TLM 50 NG-MINDIVER-138-NC-RFB / Facilitating Downstream Sec Scanning and digitization of L Single Stage - One E IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 200,000.00 230,769.97 Signed 2019-08-29 2020-01-16 2019-09-03 2020-03-24 2019-10-15 2020-06-10 2019-11-14 2020-06-25 2019-12-19 2020-08-27 2020-06-16 icense documents for E-recor nvelope g Competitiveness ding and Archiving of the Min ing Cadastre office NG-MINDIVER-133910-NC-RF B / Production of Thematic M Facilitating Downstream Sec Single Stage - One E Under Imple apping of Mineral Title of rest IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 120,000.00 0.00 2019-10-03 2019-11-04 2019-10-08 2019-11-19 2019-12-19 2020-01-23 2020-02-28 nvelope mentation ricted (Protected)Areas and i g Competitiveness ntegration into the Nigeria Di gital Cadastral Database NG-MINDIVER-133911-NC-RF Q / Acquisition, Georeferenci Facilitating Downstream Sec Single Stage - One E Under Imple ng and Geocoding of Topogra IDA / 59900 tor Development & Enhancin Post Request for Bids Open - National 125,000.00 0.00 2019-09-30 2019-11-01 2019-10-05 2020-01-17 2019-11-16 2020-02-07 2019-12-16 2020-01-20 2020-07-18 nvelope mentation phic maps for the country in g Competitiveness the Nigeria Mining Cadastre Database NG-MINDIVER-160204-NC-RF B / Procurement of Firm to un Facilitating Downstream Sec dertake Airborne Geophysica Open - Internationa Single Stage - One E IDA / 59900 tor Development & Enhancin Prior Request for Bids 15,000,000.00 26,987,344.40 Signed 2020-02-25 2020-03-30 2020-03-17 2020-04-27 2020-04-28 2020-07-01 2020-05-28 2020-10-08 2020-07-02 2020-12-05 2021-06-27 l Survey of selected areas un l nvelope g Competitiveness der the proof of concept prog ramme using High resolution magnetic & Radiometric. NG-MINDIVER-160211-NC-RF B / Procurement of firm for th Facilitating Downstream Sec e Production of Topographic Open - Internationa Single Stage - One E IDA / 59900 tor Development & Enhancin Prior Request for Bids 6,000,000.00 4,448,322.44 Signed 2020-02-25 2020-03-23 2020-03-17 2020-03-26 2020-04-28 2020-07-03 2020-05-28 2020-10-19 2020-07-02 2021-01-05 2021-06-27 Mapping (Geodata Base) usin l nvelope g Competitiveness g international Standards (M GCPOVmap2) for identified A reas under the Proof of conc ept. NG-MINDIVER-165575-NC-DI Facilitating Downstream Sec R / Engagement of Security o Under Imple IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 100,000.00 0.00 2020-03-31 2020-03-30 2020-04-05 2020-05-10 2020-11-06 utfit for the 6 Zonal Offices of mentation g Competitiveness the Nigerian Mining Cadastre Office NG-MINDIVER-210663-NC-RF B / Engagement of firm for M Establishing a Strong Found apping of clean energy miner Open - Internationa Single Stage - Two E IDA / 59900 ation for Mining Sector Deve Prior Request for Bids 6,700,000.00 0.00 Canceled 2021-02-10 2021-03-03 2021-04-14 2021-06-27 2021-08-01 2022-07-27 al resources as part of the Na l nvelope lopment tional Integrated Mineral Expl oration Programme (NIMEP) phase 2 NG-MINDIVER-278437-NC-RF Q / Development and Product Project Management and Co Request for Quota Single Stage - One E Pending Impl ion of Brochure and Compen IDA / 59900 Post Limited 50,000.00 0.00 2022-08-28 2022-10-23 2023-04-21 ordination tions nvelope ementation dium of all Mindiver activities /Projects (Past/Present) in Ag encies across the Country CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MINDIVER/QCBS/CS/002-18 / Advisory Firm to Strengthen t he Institutional Frameworks Establishing a Strong Found Quality And Cost- Governing the Mining Sector IDA / 59900 ation for Mining Sector Deve Prior Open - National 1,200,000.00 0.00 Canceled 2018-01-15 2018-07-23 2018-02-05 2018-10-23 2018-03-21 2018-04-18 2018-05-18 2018-06-22 2018-07-27 2019-07-27 Based Selection (Functional analysis and insti lopment tutional restructuring) and Se ctor Administrative Capacity Building MINDIVER/QCBS/CS/006-17 / Review of legal & regulatory frameworks for environment al mgt, the design of policy fr Establishing a Strong Found Quality And Cost- Under Implement ameworks to apply WB safeg IDA / 59900 ation for Mining Sector Deve Prior Open - National 2,000,000.00 0.00 2018-05-02 2018-03-20 2018-05-23 2018-07-28 2018-07-06 2019-02-20 2018-08-03 2019-04-23 2018-09-02 2019-06-11 2018-10-07 2019-10-18 2018-11-11 2019-11-11 Based Selection ation uards policies & the devt of lopment mitigation measures & guidel ines for addressing potential conflicts between ASM opera tors & other land users MINDIVER/QCBS/CS/009-18 / Consultancy to design and i Facilitating Downstream Sec Quality And Cost- mplement safer and cleaner IDA / 59900 tor Development & Enhancin Prior Open - National 1,650,000.00 0.00 Canceled 2018-01-16 2018-02-06 2018-03-22 2018-04-19 2018-05-19 2018-06-23 2018-07-28 2019-07-28 Based Selection mining programmes, efficient g Competitiveness technologies and practies in t he mining and steel sector MINDIVER/QCBS/CS/011-18 / Develop Mines Inspectorate f or ASM field inspection and r Facilitating Downstream Sec Quality And Cost- Under Implement ecommend how to equip the IDA / 59900 tor Development & Enhancin Prior Open - National 450,000.00 0.00 2018-03-30 2018-03-06 2018-04-20 2018-03-27 2018-06-03 2018-08-24 2018-07-01 2018-10-18 2018-07-31 2019-06-23 2018-09-04 2020-02-24 2018-10-09 2019-10-09 Based Selection ation Mines Inspectorate with appr g Competitiveness opriate and modern technical and logistics equipment and tools MINDIVER/QCBS/CS/013-18 / Consultancy to assist with id Establishing a Strong Found Quality And Cost- Under Implement entification of revenue leaka IDA / 59900 ation for Mining Sector Deve Post Open - National 450,000.00 0.00 2018-03-30 2018-04-25 2018-04-20 2018-06-03 2018-10-22 2018-07-01 2019-01-28 2018-07-31 2019-03-20 2018-09-04 2019-05-27 2018-10-09 2019-10-09 Based Selection ation ges, strengthen revenue ass lopment essment and develop action plan to combat smuggling MINDIVER/IC/CS/015-17 / Co nsultancy to provide support Establishing a Strong Found to NGSA and MMSD for miner Quality And Cost- Open - Internationa IDA / 59900 ation for Mining Sector Deve Prior 12,600,000.00 0.00 Canceled 2018-08-01 2018-08-22 2018-10-05 2018-11-02 2018-12-02 2019-01-06 2019-02-10 2020-02-10 al prospectivity testing, integ Based Selection l lopment ration and packaging using s atellite data-based foundatio n layers and collection of geo data Page 6 MINDIVER/QCBS/CS/020-18 / Development of support acti Facilitating Downstream Sec Quality And Cost- on to improve the Metallurgic IDA / 59900 tor Development & Enhancin Post Open - National 480,000.00 404,061.01 Signed 2018-02-05 2018-02-19 2018-02-26 2018-03-15 2018-04-11 2018-07-25 2018-05-09 2018-09-17 2018-06-08 2018-10-25 2018-07-13 2019-01-15 2018-08-17 2019-04-17 2019-08-17 Based Selection al and steel Inspectorate incl g Competitiveness uding an initial baseline stud y MINDIVER/QCBS/CS/023-18 / Consultancy to assess and b Establishing a Strong Found uild capacity in mining financ Quality And Cost- Open - Internationa IDA / 59900 ation for Mining Sector Deve Prior 1,300,000.00 0.00 Canceled 2018-01-04 2018-01-25 2018-03-10 2018-04-07 2018-05-07 2018-06-11 2018-07-16 2019-07-16 ing through design and imple Based Selection l lopment mentation of training progra mmes and support within fin ancing institutions MINDIVER/QCBS/CS/025-18 / Facilitating Downstream Sec Quality And Cost- Institutional and Administrati IDA / 59900 tor Development & Enhancin Post Open - National 450,000.00 0.00 Canceled 2018-02-15 2017-11-20 2018-03-08 2018-03-15 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-27 2019-08-27 Based Selection ve restructuring of the SMDF g Competitiveness MINDIVER/QCBS/CS/026-18 / Facilitating Downstream Sec Design and implementation o Quality And Cost- IDA / 59900 tor Development & Enhancin Prior Open - National 450,000.00 0.00 Canceled 2018-02-15 2018-07-23 2018-03-08 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-27 2019-08-27 f a public/Private sector Inves Based Selection g Competitiveness tment funding framework for the SMDF MINDIVER/QCBS/CS/027-18 / Consultancy to advance sele Facilitating Downstream Sec cted 'proof of concept' assets Quality And Cost- Open - Internationa IDA / 59900 tor Development & Enhancin Prior 3,000,000.00 0.00 Canceled 2017-11-30 2017-12-21 2018-02-03 2018-03-03 2018-04-02 2018-05-07 2018-06-11 2019-06-11 , assess their infrastructure n Based Selection l g Competitiveness eeds and also assist with dev elopment of a tender strateg y MINDIVER/QCBS/CS/046-18 / Project Management and Co Quality And Cost- Open - Internationa IDA / 59900 Prior 1,200,000.00 920,973.62 Signed 2017-11-12 2018-03-06 2017-12-03 2018-03-27 2018-01-16 2018-07-23 2018-02-13 2018-09-28 2018-03-15 2018-11-28 2018-04-19 2019-01-28 2018-05-24 2019-02-20 2019-05-24 Project Management Office ordination Based Selection l MINDIVER/QCBS/CS/053-18 / Facilitating Downstream Sec Design and implement a stra Quality And Cost- Open - Internationa Under Implement IDA / 59900 tor Development & Enhancin Post 450,000.00 0.00 2018-01-31 2018-03-06 2018-02-21 2018-06-08 2018-04-06 2018-05-04 2018-06-03 2019-04-11 2018-07-08 2018-08-12 2019-08-12 tegy for developing Nigeria’s Based Selection l ation g Competitiveness gemstone and jewellery indu stry MINDIVER/CQ/CS/058-18 / C Establishing a Strong Found onsultancy Service for design Consultant Qualifi IDA / 59900 ation for Mining Sector Deve Post Open - National 200,000.00 0.00 Canceled 2018-05-21 2018-06-11 2018-07-25 2018-08-24 2018-09-28 2019-03-27 and Supervision of Road Con cation Selection lopment struction under 'proof of conc ept' . MINDIVER/CQ/CS-059/18 / C Establishing a Strong Found onsultancy Service for the D Consultant Qualifi IDA / 59900 ation for Mining Sector Deve Post Open - National 50,000.00 0.00 Canceled 2018-06-05 2018-06-26 2018-08-09 2018-09-08 2018-10-13 2019-04-11 esign and Supervision of Ren cation Selection lopment ovation of NIMG,Jos MINDIVER/CQ/CS-054/18 / C onsultancy Service for the D Establishing a Strong Found Consultant Qualifi esign and Supervision of Ren IDA / 59900 ation for Mining Sector Deve Post Open - National 100,000.00 0.00 Canceled 2018-06-05 2018-06-26 2018-08-09 2018-09-08 2018-10-13 2019-04-11 cation Selection ovation of NGSA and Dimensi lopment on stone Laboratories in Kad una MINDIVER/CQ/CS-034/18 / C Establishing a Strong Found Consultant Qualifi Under Implement onsultancy Services for the u IDA / 59900 ation for Mining Sector Deve Post Limited 250,000.00 0.00 2018-01-25 2017-11-22 2018-02-08 2018-02-15 2018-03-10 2018-04-14 2018-10-11 cation Selection ation pdate of the Mineral and Mini lopment ng Act of 2007 MINDIVER/CQ/CS-028/18 / C Establishing a Strong Found onsultancy services for the D Consultant Qualifi Under Implement IDA / 59900 ation for Mining Sector Deve Post Limited 250,000.00 0.00 2018-01-28 2017-12-06 2018-02-11 2018-03-13 2018-04-17 2018-10-14 evelopment and Implementa cation Selection ation lopment tion of Communication Strate gies MINDIVER/QCBS/CS/008-18 / Formalization of artisanal mi ners into cooperatives and s Facilitating Downstream Sec mall-scale miners into larget Quality And Cost- Open - Internationa IDA / 59900 tor Development & Enhancin Prior 3,500,000.00 0.00 Canceled 2018-03-15 2018-03-06 2018-04-05 2018-03-27 2018-05-19 2018-08-16 2018-06-16 2018-07-16 2018-08-20 2018-09-24 2019-09-24 mineral and financial enterpri Based Selection l g Competitiveness ses together with the design and implememtation of an A SM remote sensing montorin g system in the mining and s teel sector MINDIVER/CQ/CS/0070-18 / ENGAGEMENT OF CONSULTI Establishing a Strong Found NG FIRM TO CARRY OUT NEE Consultant Qualifi IDA / 59900 ation for Mining Sector Deve Post Limited 250,000.00 332,263.22 Signed 2018-07-16 2018-08-15 2018-07-30 2018-08-01 2018-08-29 2018-12-18 2018-10-03 2019-01-11 2019-04-01 DS ASSESSMENT AND EVALU cation Selection lopment ATION OF THE NIGERIAN GEO LOGICAL SURVEY AGENCY (N GSA) MINDIVER/CQ/CS-071/ -18 / Engagement of a Consulting Establishing a Strong Found Consultant Qualifi Under Implement firm to carry out a review of i IDA / 59900 ation for Mining Sector Deve Post Limited 250,000.00 0.00 2018-07-16 2018-08-24 2018-08-15 2018-09-06 2018-08-30 2018-11-13 2018-10-04 2019-04-02 cation Selection ation mplemented Nigeria Mineral lopment Resources Decision Support System (NMRDSS). MINDIVER/QCBS/CS/080/18 / Formalization of artisanal mi Establishing a Strong Found Quality And Cost- Open - Internationa ners into cooperatives the d IDA / 59900 ation for Mining Sector Deve Prior 3,500,000.00 2,716,867.64 Signed 2018-07-30 2018-08-20 2018-09-10 2018-08-27 2018-10-08 2018-11-30 2018-11-07 2019-02-11 2018-12-12 2019-05-22 2019-01-16 2019-06-22 2020-01-16 Based Selection l esign and implememtation of lopment an ASM remote sensing mont oring system MINDIVER/QCBS/CS/081/18 / Facilitating Downstream Sec Institutional and Administrati Quality And Cost- Open - Internationa Under Implement IDA / 59900 tor Development & Enhancin Prior 900,000.00 0.00 2018-08-10 2018-08-31 2018-10-14 2018-10-24 2018-11-11 2018-12-14 2018-12-11 2019-02-18 2019-01-15 2019-05-07 2019-02-19 2020-02-19 ve restructuring of the Solid Based Selection l ation g Competitiveness Mineral Development Fund ( SMDF) MINDIVER/CQ/CS/014-18 / D esign and develop a mechani Establishing a Strong Found Consultant Qualifi Under Implement sm for citizens engagement IDA / 59900 ation for Mining Sector Deve Post Open - National 200,000.00 0.00 2019-03-31 2019-11-06 2019-04-21 2020-01-22 2019-06-04 2020-03-24 2019-07-04 2020-06-04 2019-08-08 2020-02-04 cation Selection ation and social accountability in t lopment he MinDiver Project and the Mining sector MINDIVER/CS/CQ/122-19 / E ngagement of a Firm to prep Facilitating Downstream Sec Consultant Qualifi Under Implement are/update the Strategic Envi IDA / 59900 tor Development & Enhancin Post Open - National 200,000.00 0.00 2019-02-05 2019-02-08 2019-02-26 2019-04-11 2019-05-11 2019-06-15 2019-12-12 cation Selection ation ronment and Social Assesme g Competitiveness nt (SESA) Report for Mindiver Project MINDIVER/CS/CQ/121/19 / E Facilitating Downstream Sec ngagement of Firm for overal Quality And Cost- IDA / 59900 tor Development & Enhancin Post Open - National 350,000.00 326,969.58 Signed 2019-06-19 2019-04-05 2019-07-10 2019-05-03 2019-08-23 2019-10-22 2019-09-20 2019-12-12 2019-10-20 2020-01-15 2019-11-24 2020-10-05 2019-12-29 2021-01-08 2020-12-28 l Quality Asurance of the Pro Based Selection g Competitiveness duction of Topographic Maps Page 7 NG-MINDIVER-103090-CS-C Facilitating Downstream Sec QS / Engagement of Firm for Quality And Cost- IDA / 59900 tor Development & Enhancin Prior Open - National 350,000.00 769,181.35 Signed 2019-04-20 2019-04-05 2019-05-11 2019-05-03 2019-06-24 2019-10-22 2019-07-22 2019-12-04 2019-08-21 2020-01-07 2019-09-25 2020-11-11 2019-10-30 2021-01-04 2020-10-29 overall Quality Assurance of Based Selection g Competitiveness Airborne Geophysical Survey- 5percent MINDIVER/CQ/CS/082-19 / E ngagement of Consultant to Facilitating Downstream Sec Quality And Cost- design and implement a Fra IDA / 59900 tor Development & Enhancin Prior Open - National 400,000.00 0.00 Canceled 2019-04-26 2019-05-17 2019-06-30 2019-07-28 2019-08-27 2019-10-01 2019-11-05 2020-11-04 Based Selection mework to restructure and re g Competitiveness position the Women in Minin g in Nigeria MINDIVER/QCBS/CS/050-18 / Project Management and Co Quality And Cost- IDA / 59900 Prior Open - National 600,000.00 0.00 Canceled 2018-05-30 2018-06-20 2018-08-03 2018-08-31 2018-09-30 2018-11-04 2018-12-09 2019-12-09 Quality Assurance Consultant ordination Based Selection MINDIVER/QCBS/CS/012-18 / Establishing a Strong Found Design and implement an Ele Quality And Cost- Open - Internationa IDA / 59900 ation for Mining Sector Deve Prior 500,000.00 0.00 Canceled 2018-02-28 2018-03-21 2018-05-04 2018-06-01 2018-07-01 2018-08-05 2018-09-09 2019-09-09 ctronic Archiving Manageme Based Selection l lopment nt System for NGSA MINDIVER/CQ/CS-018/18 / C Establishing a Strong Found onduct needs assessment of Consultant Qualifi IDA / 59900 ation for Mining Sector Deve Post Open - National 250,000.00 0.00 Canceled 2018-02-05 2019-03-15 2018-02-26 2018-04-11 2018-05-11 2018-06-15 2018-12-12 NIMG training infrastructure cation Selection lopment and setup procurement proc ess for refurbishment NG-MINDIVER-103077-CS-C QS / Engagement of Consulti Facilitating Downstream Sec Quality And Cost- ng Firm for preparation of BO IDA / 59900 tor Development & Enhancin Post Open - National 300,000.00 0.00 Canceled 2019-03-13 2019-04-03 2019-05-17 2019-06-14 2019-07-14 2019-08-18 2019-09-22 2020-09-21 Based Selection Q and Supervision of ALL Wo g Competitiveness rks activities for the Mindiver Project. NG-MINDIVER-114357-CS-C QS / Engagement of Consulti Facilitating Downstream Sec Consultant Qualifi Under Implement ng Firm for preparation of BO IDA / 59900 tor Development & Enhancin Post Limited 300,000.00 0.00 2019-05-20 2019-05-02 2019-06-03 2019-04-19 2019-07-03 2019-08-07 2020-02-03 cation Selection ation Q and Supervision of ALL Wo g Competitiveness rks activities for the Mindiver Project. MINDIVER/QCBS/CS/016-18 / Consultancy to provide advic e in the dissemination of geol Establishing a Strong Found Quality And Cost- ogical knowledge and in parti IDA / 59900 ation for Mining Sector Deve Prior Open - National 720,000.00 0.00 Canceled 2018-08-01 2018-08-22 2018-10-05 2018-11-02 2018-12-02 2019-01-06 2019-02-10 2020-02-10 Based Selection cular by the development of lopment a web application portal and system architecture to suppo rt MMIS MINDIVER/QCBS/CS/022-18 / Consultancy to undertake ne eds assessment and evaluati Facilitating Downstream Sec Quality And Cost- Open - Internationa on addressing mineral value IDA / 59900 tor Development & Enhancin Prior 1,150,000.00 0.00 Canceled 2018-08-03 2018-08-24 2018-10-07 2018-11-04 2018-12-04 2019-01-08 2019-02-12 2020-02-12 Based Selection l chain technical skills demand g Competitiveness gap including analysis of ext ension benefits and opportun ities. MINDIVER/QCBS/CS/030-18 / Advisory firm to prepare and Establishing a Strong Found Quality And Cost- implement a Road Map to cat IDA / 59900 ation for Mining Sector Deve Post Open - National 480,000.00 0.00 Canceled 2018-03-31 2018-04-21 2018-06-04 2018-07-02 2018-08-01 2018-09-05 2018-10-10 2019-10-10 Based Selection alyse the mineral Sector for lopment Regional Development.(Econ omic corridor) MINDIVER/QCBS/CS/019-18 / Design policy, regulatory fra mework & programmes to ad Facilitating Downstream Sec d value to mineral support ce Quality And Cost- Open - Internationa IDA / 59900 tor Development & Enhancin Prior 3,650,000.00 0.00 Canceled 2018-02-15 2018-03-08 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-27 2019-08-27 nters, processing & fabricatin Based Selection l g Competitiveness g activities together with the analysis of ecoN drivers to de velop & impl a strategy to uti lise domestic SS of minerals MINDIVER/CQ/CS/049-18 / Ec Facilitating Downstream Sec Consultant Qualifi onomic impact analysis (and IDA / 59900 tor Development & Enhancin Post Limited 220,000.00 0.00 Canceled 2017-03-12 2017-03-26 2017-04-25 2017-05-30 2017-11-26 cation Selection Economic Linkages)in the Mi g Competitiveness ning Sector MINDIVER/CQ/CS/047-18 / In ternational Consultant to Pro vide technical assistance on t Establishing a Strong Found Consultant Qualifi Open - Internationa he geological and mineralizat IDA / 59900 ation for Mining Sector Deve Post 200,000.00 0.00 Canceled 2017-09-19 2018-05-24 2017-10-10 2017-11-23 2017-12-23 2018-01-27 2018-07-26 cation Selection l ion characterisation of pegm lopment atites with potentials of Lithi um, metals & REE in the Mini ng sector NG-MINDIVER-132-CS-QCBS / Engagement of Firm to dev Facilitating Downstream Sec elop strategy and Design pro Quality And Cost- Open - Internationa IDA / 59900 tor Development & Enhancin Prior 750,000.00 0.00 Canceled 2019-08-25 2019-10-18 2019-09-15 2019-10-29 2019-11-26 2019-12-26 2020-01-30 2020-03-05 2021-03-05 grammes to support educatio Based Selection l g Competitiveness n, training and expansion of skills necessary for the devel opment of the Mining Sector. NG-MINDIVER-139-CS-QCBS / Consultancy services for th Facilitating Downstream Sec e Local Capacity building in E Quality And Cost- Under Implement IDA / 59900 tor Development & Enhancin Post Open - National 400,000.00 0.00 2019-09-30 2019-09-10 2019-10-21 2020-06-30 2019-12-04 2020-10-06 2020-01-01 2020-11-17 2020-01-31 2020-03-06 2020-04-10 2021-04-10 nvironmental management f Based Selection ation g Competitiveness or regulators and Practitioner s in the Nigerian Mineral and Mining Sector MINDIVER/QCBS/CS/003-17 / Establishing a Strong Found Consultancy for Geological A Quality And Cost- Open - Internationa IDA / 59900 ation for Mining Sector Deve Prior 3,000,000.00 0.00 Canceled 2018-02-05 2018-07-23 2018-02-26 2018-04-18 2018-05-16 2018-06-15 2018-07-20 2018-08-24 2021-08-23 dvisory Services (TA embed) Based Selection l lopment in the Mining and Steel secto r MINDIVER/QCBS/CS/007-18 / Consultancy for the develop Establishing a Strong Found ment of a comprehensive act Quality And Cost- IDA / 59900 ation for Mining Sector Deve Post Open - National 450,000.00 0.00 Canceled 2018-02-15 2018-03-26 2018-03-08 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-27 2019-08-27 ion plan to create opportuniti Based Selection lopment es for women in the mining a nd steel sector and to mitigat e risks that are unique to wo men MINDIVER/QCBS/CS/004-18 / Establishing a Strong Found Consultancy to provide skills Quality And Cost- IDA / 59900 ation for Mining Sector Deve Prior Open - National 6,000,000.00 0.00 Canceled 2018-02-01 2018-07-23 2018-02-22 2018-04-07 2018-05-05 2018-06-04 2018-07-09 2018-08-13 2019-08-13 building and education suppo Based Selection lopment rt for mining sector develop ment to MMSD Page 8 NG-MINDIVER-147931-CS-C Q / Engagement of an adviso ry firm to undertake an asses Establishing a Strong Found Consultant Qualifi Open - Internationa sment of the identified prosp IDA / 59900 ation for Mining Sector Deve Post 300,000.00 0.00 Canceled 2019-12-31 2020-03-20 2020-01-21 2020-03-05 2020-04-04 2020-05-09 2020-11-05 cation Selection l ective mineral targets and mi lopment ning assets selected as pote ntial Proof of Concept suppor t and/or investment promotio n  NG-MINDIVER-151185-CS-Q CBS / Engagement of a firm t o design a special incubation Facilitating Downstream Sec Quality And Cost- Open - Internationa programme to create viable, IDA / 59900 tor Development & Enhancin Prior 600,000.00 0.00 Canceled 2019-12-31 2020-01-21 2020-03-05 2020-04-02 2020-05-02 2020-06-06 2020-07-11 2021-04-07 Based Selection l homegrown junior mining co g Competitiveness mpanies and the incorporatio n of an SPV for investing in b rownfield mines developmen t NG-MINDIVER-147944-CS-Q CBS / Engagement of a Cons Establishing a Strong Found Quality And Cost- Open - Internationa Under Implement ultant to support the MMSD i IDA / 59900 ation for Mining Sector Deve Post 500,000.00 0.00 2020-01-20 2020-03-16 2020-02-10 2020-03-25 2020-04-22 2020-05-22 2020-06-26 2020-07-31 2022-07-31 Based Selection l ation n analyzing and implementin lopment g a Roadmap for economic c orridor development NG-MINDIVER-114360-CS-C QS / Engagement of Consulti ng Firm to carry out a Gende Facilitating Downstream Sec Consultant Qualifi r impact assessment and de IDA / 59900 tor Development & Enhancin Post Limited 250,000.00 0.00 Canceled 2019-10-16 2019-09-19 2019-10-30 2019-11-29 2020-01-03 2020-07-01 cation Selection velopment of a comprehensi g Competitiveness ve action plan to create oppo rtunities for women in the mi ning and steel sector NG-MINDIVER-151-CS-QCBS / Engagement of Consulting F irm to undertake the prepara tion of (Abbreviated) Resettle Facilitating Downstream Sec Consultant Qualifi ment Action Plan (ARAP) for IDA / 59900 tor Development & Enhancin Post Limited 150,000.00 0.00 Canceled 2019-09-15 2019-09-13 2019-09-29 2019-10-29 2019-12-03 2020-03-02 cation Selection Ladi Kwali pottery centre and g Competitiveness Environmental and Social Ma nagement Plan (ESMP) for La di Kwali, NGSA Kaduna, NGRL Kaduna, NIMG Jos & NMDC Jo s. NG-MINDIVER-165414-CS-Q CBS / Engagement of a Cons ulting Firm to Conduct a Gen der Impact Assessment of Mi Facilitating Downstream Sec Quality And Cost- Open - Internationa nDiver Project and the Nigeri IDA / 59900 tor Development & Enhancin Post 275,000.00 221,247.27 Signed 2020-04-30 2020-04-14 2020-05-11 2020-06-16 2020-06-24 2021-01-13 2020-07-22 2021-03-05 2020-08-21 2021-03-29 2020-09-25 2021-04-12 2020-10-30 2021-07-31 2021-10-30 Based Selection l an Mining Sector and to Deve g Competitiveness lop a Comprehensive Action Plan to Create Opportunities for Women in the Mining and Steel Sector and to Mitigate Risks NG-MINDIVER-147944-QCBS -CS / Engagement of a Consu Establishing a Strong Found Quality And Cost- Open - Internationa ltant to support the MMSD in IDA / 59900 ation for Mining Sector Deve Prior 750,000.00 854,069.22 Signed 2020-04-15 2020-05-07 2020-05-06 2020-07-15 2020-06-19 2021-03-08 2020-07-17 2021-04-15 2020-08-16 2021-06-14 2020-09-20 2021-09-07 2020-10-25 2021-10-04 2022-10-25 Based Selection l analyzing and implementing lopment a Roadmap for economic corr idor development NG-MINDIVER-147931-CS-Q CBS / Engagement of an advi sory firm to undertake an ass Establishing a Strong Found Quality And Cost- Open - Internationa Under Implement essment of the identified pro IDA / 59900 ation for Mining Sector Deve Prior 750,000.00 0.00 2020-04-15 2020-04-23 2020-05-06 2020-07-15 2020-06-19 2020-07-17 2020-08-16 2020-09-20 2020-10-25 2021-10-25 Based Selection l ation spective mineral targets and lopment mining assets selected as po tential proof of concept supp ort and/or investment promo tion MINDIVER/QCBS/CS/029-18 / Establishing a Strong Found Quality And Cost- Open - Internationa Design, develop and implem IDA / 59900 ation for Mining Sector Deve Prior 1,500,000.00 0.00 Canceled 2018-01-12 2018-02-02 2018-03-18 2018-04-15 2018-05-15 2018-06-19 2018-07-24 2019-07-24 Based Selection l ent an integrated MMIS for th lopment e mining sector NG-MINDIVER-115028-CS-C QS / / Consulting firm to carr y out enhancements to the N Facilitating Downstream Sec Consultant Qualifi igerian Mineral Resources De IDA / 59900 tor Development & Enhancin Post Open - National 200,000.00 0.00 Canceled 2020-03-31 2020-04-21 2020-06-04 2020-07-04 2020-08-08 2021-02-04 cation Selection cision Support System (NMR g Competitiveness DSS) including Transaction A reas in an Open System Archi tecture- NG-MINDIVER-200688-CS-Q CBS / Engagement of a consu Facilitating Downstream Sec lting firm to support the MMS Quality And Cost- Open - Internationa Under Implement IDA / 59900 tor Development & Enhancin Prior 650,000.00 0.00 2020-11-30 2021-01-25 2020-12-21 2021-03-10 2021-02-03 2021-03-03 2021-04-02 2021-05-07 2021-06-11 2022-06-11 D in implementing a strategy Based Selection l ation g Competitiveness for the development of Barite and Tin Industries in Nigeria. MINDIVER/CQ/CS/088-18 / E ngagement of Consultant to Establishing a Strong Found Consultant Qualifi Support the MMSD in develo IDA / 59900 ation for Mining Sector Deve Post Open - National 100,000.00 0.00 Canceled 2018-11-20 2018-11-29 2018-12-11 2019-01-24 2019-02-23 2019-03-30 2019-09-26 cation Selection ping and implementing a stra lopment tegy to revive the Tin Industr y in Nigeria NG-MINDIVER-107441-CS-C QS / Engagement of Consulta Facilitating Downstream Sec Consultant Qualifi nt to design and implement a IDA / 59900 tor Development & Enhancin Post Limited 175,000.00 0.00 Canceled 2019-05-14 2019-05-13 2019-05-28 2019-06-27 2019-08-01 2020-01-28 cation Selection Framework to restructure an g Competitiveness d reposition the Women in Mi ning in Nigeria MINDIVER/CQ/CS/209-19 / C onsultancy to design and imp Facilitating Downstream Sec Consultant Qualifi lement safer and cleaner min IDA / 59900 tor Development & Enhancin Post Open - National 300,000.00 0.00 Canceled 2019-05-01 2019-05-28 2019-05-22 2019-09-24 2019-07-05 2019-08-04 2019-09-08 2020-03-06 cation Selection ing programmes, efficient tec g Competitiveness hnologies and practices in th e mining and steel sector MINDIVER/QCBS/CS-057/18 / Needs assessment and evalu Facilitating Downstream Sec Quality And Cost- Open - Internationa ation for accrediting and cert IDA / 59900 tor Development & Enhancin Prior 3,000,000.00 0.00 Canceled 2018-02-15 2019-05-01 2018-03-08 2019-05-23 2018-04-21 2018-05-19 2018-06-18 2018-07-23 2018-08-27 2021-08-26 Based Selection l ifying laboratories including g Competitiveness operationalization geological research laboratories NG-MINDIVER-184765-CS-C QS / Engagement of a consul Facilitating Downstream Sec Consultant Qualifi Open - Internationa ting firm to support the MMS IDA / 59900 tor Development & Enhancin Post 200,000.00 0.00 Canceled 2020-07-24 2020-08-14 2020-09-27 2020-10-27 2020-12-01 2021-05-30 cation Selection l D in implementing a strategy g Competitiveness for the development of the B arite Industry in Nigeria. Page 9 NG-MINDIVER-210664-CS-C QS / Engagement of consulti Establishing a Strong Found ng firm to undertake the pre Consultant Qualifi IDA / 59900 ation for Mining Sector Deve Post Limited 200,000.00 206,476.94 Signed 2021-02-04 2021-03-07 2021-02-18 2021-05-11 2021-03-20 2021-07-28 2021-04-24 2021-07-19 2021-10-21 paration of Environmental an cation Selection lopment d Social Management Plan (E SMP) as part of NIMEP extens ion NG-MINDIVER-210845-CS-C Q / Engagement of a Consult Facilitating Downstream Sec Consultant Qualifi Under Implement ant to Identify 20 prioritized IDA / 59900 tor Development & Enhancin Post Open - National 200,000.00 0.00 2021-02-11 2021-02-12 2021-03-04 2021-02-18 2021-04-17 2021-04-16 2021-05-17 2021-06-21 2021-12-18 cation Selection ation Abandoned Mine Sites in Nig g Competitiveness eria and Develop an Action Pl an for their Rehabilitation MINDIVER/QCBS/CS/023B-19 / Consultancy to assess and Facilitating Downstream Sec build capacity in mining finan Quality And Cost- IDA / 59900 tor Development & Enhancin Prior Open - National 500,000.00 0.00 Canceled 2019-06-05 2019-09-10 2019-06-26 2019-12-04 2019-08-09 2019-09-06 2019-10-06 2019-11-10 2019-12-15 2020-12-14 cing through design and impl Based Selection g Competitiveness ementation of training progra mmes and support within fin ancing institutions NG-MINDIVER-221903-CS-Q CBS / Consultancy to assess Facilitating Downstream Sec and build capacity in mining f Quality And Cost- Open - Internationa Under Implement IDA / 59900 tor Development & Enhancin Post 350,000.00 0.00 2021-03-15 2021-03-22 2021-04-05 2021-04-08 2021-05-19 2021-06-23 2021-06-16 2021-08-10 2021-07-16 2021-08-10 2021-08-20 2021-09-24 2022-06-21 inancing through design and Based Selection l ation g Competitiveness implementation of training pr ogrammes and support withi n financing institutions NG-MINDIVER-278370-CS-C QS / Engagement of Consulta nt for the engineering design , preparation of Bill of Quanti Establishing a Strong Found Consultant Qualifi Under Implement ties (BOQ) and Supervision of IDA / 59900 ation for Mining Sector Deve Post Limited 250,000.00 0.00 2022-02-27 2022-03-04 2022-03-13 2022-04-12 2022-05-17 2023-02-11 cation Selection ation the National Institute of Mini lopment ng and Geosciences, (NIMG) J os and the Remodelling of M odern Core Shed for the Nati onal Geological Survey Agen cy NG-MINDIVER-278444-CS-C QS / Engagement of Consulti Facilitating Downstream Sec Consultant Qualifi Under Implement ng firm to provide transactio IDA / 59900 tor Development & Enhancin Post Limited 250,000.00 0.00 2022-02-28 2022-04-19 2022-03-14 2022-04-13 2022-05-18 2022-11-14 cation Selection ation n advisory services for the La g Competitiveness di Kwali centre Concession NG-MINDIVER-278442-CS-Q CBS / Engagement of firm to Establishing a Strong Found provide technical assistance Quality And Cost- Open - Internationa IDA / 59900 ation for Mining Sector Deve Prior 4,800,000.00 0.00 Under Review 2022-03-01 2022-03-09 2022-03-22 2022-03-18 2022-05-05 2022-05-31 2022-06-02 2022-07-14 2022-07-02 2022-09-29 2022-08-06 2022-12-20 2022-09-10 2023-09-10 and supervise the carrying o Based Selection l lopment ut geochemical mapping of s elected areas under the proo f of concept in Nigeria NG-MINDIVER-278438-CS-Q Facilitating Downstream Sec Quality And Cost- CBS / Engagement of Consult IDA / 59900 tor Development & Enhancin Post Open - National 500,000.00 0.00 Canceled 2022-02-28 2022-03-04 2022-03-21 2022-05-04 2022-06-01 2022-07-01 2022-08-05 2022-09-09 2023-09-09 Based Selection ing Firm for Domestic Invest g Competitiveness ment facilitation. NG-MINDIVER-289144-CS-Q CBS / Engagement of an advi Facilitating Downstream Sec Quality And Cost- Open - Internationa Under Implement sory firm to carry out Mining i IDA / 59900 tor Development & Enhancin Prior 2,000,000.00 0.00 2022-04-15 2022-05-19 2022-05-06 2022-05-30 2022-06-19 2022-10-17 2022-07-17 2022-11-29 2022-08-16 2023-02-28 2022-09-20 2022-10-25 2023-10-25 Based Selection l ation nvestment facilitation activiti g Competitiveness es on acquired geological inf ormation. NG-MINDIVER-295393-CS-Q CBS / Engagement of a Cons Establishing a Strong Found ulting Firm to undertake the Quality And Cost- Under Implement IDA / 59900 ation for Mining Sector Deve Post Open - National 750,000.00 0.00 2022-05-19 2022-05-23 2022-06-09 2022-06-26 2022-07-23 2022-09-21 2022-08-20 2022-11-02 2022-09-19 2022-12-08 2022-10-24 2022-12-20 2022-11-28 2023-05-27 Design, Development and Op Based Selection ation lopment erationalization of an Environ mental and Social Informatio n System (ESIS) NG-MINDIVER-200721-CS-C Facilitating Downstream Sec Consultant Qualifi QS / Engagement of External IDA / 59900 tor Development & Enhancin Post Limited 50,000.00 0.00 Canceled 2020-10-30 2020-11-13 2020-12-13 2021-01-17 2021-07-16 cation Selection auditor for the Mindiver Proje g Competitiveness ct NG-MINDIVER-278441-CS-Q CBS / Engagement of a Mana Facilitating Downstream Sec gement Consulting Firm for C Quality And Cost- IDA / 59900 tor Development & Enhancin Post Open - National 400,000.00 0.00 Canceled 2022-03-13 2022-03-24 2022-04-03 2022-05-17 2022-06-14 2022-07-14 2022-08-18 2022-09-22 2023-09-22 hange Management and Cap Based Selection g Competitiveness ability Transfer in MMSD to e nsure the sustainability of Mi nDiver Activities. NG-MINDIVER-300335-CS-Q CBS / ENGAGEMENT OF A CO Establishing a Strong Found NSULTING FIRM FOR THE MA Quality And Cost- Open - Internationa Under Implement IDA / 59900 ation for Mining Sector Deve Post 800,000.00 0.00 2022-06-27 2022-06-22 2022-07-18 2022-08-11 2022-08-31 2022-10-27 2022-09-28 2022-12-07 2022-10-28 2022-12-02 2023-01-06 2023-10-03 RKET ASSESSMENT AND BAT Based Selection l ation lopment TERY STORAGE VALUE–CHAI N CREATION FOR MARKET TR ANSFORMATION IN NIGERIA INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MINDIVER/SS/CS/001-17 / Up grading and automation of th Establishing a Strong Found e MCO for online applications IDA / 59900 ation for Mining Sector Deve Prior Direct Selection Direct 700,000.00 504,718.66 Under Review 2018-01-16 2018-03-06 2018-02-02 2018-04-12 2018-04-08 2018-10-01 2018-10-05 , e-recording, archiving & est lopment ablishment of the Mining Cad astre Offices in the Six Geo-P olitical Zones MINDIVER/IC/CS/005-18 / Re Establishing a Strong Found view the existing Strategic E Individual Consult IDA / 59900 ation for Mining Sector Deve Post Limited 100,000.00 39,888.00 Signed 2018-01-25 2017-06-29 2018-02-08 2018-03-27 2018-03-01 2018-05-01 2018-04-05 2019-05-15 2018-11-01 nvironmental and Social Asse ant Selection lopment ssment (SESA) and update w here necessary MINDIVER/IC/CS/010-18 / De Facilitating Downstream Sec Individual Consult velopment of Small Grants M IDA / 59900 tor Development & Enhancin Post Limited 60,000.00 17,124.80 Completed 2018-02-08 2017-06-19 2018-02-13 2018-02-28 2018-03-06 2018-04-12 2018-04-10 2018-06-01 2018-10-07 2019-11-13 ant Selection anual for the Mining and Stee g Competitiveness l Sector. MINDIVER/IC/CS/038-18 / En Project Management and Co Individual Consult Under Implement IDA / 59900 Post Limited 50,000.00 0.00 2017-11-01 2017-06-29 2017-11-06 2018-03-21 2017-11-27 2019-07-30 2018-01-01 2018-06-30 vironmental Safeguard Speci ordination ant Selection ation alist MINDIVER/SS/CS//044-17 / C Establishing a Strong Found onsultant to design a workpla IDA / 59900 ation for Mining Sector Deve Prior Direct Selection Direct 150,000.00 0.00 Canceled 2018-03-15 2018-03-30 2018-06-03 2018-11-30 n for the Implementation of lopment Mineral Assets around NIOMC O Page 10 MINDIVER/IC/CS-037/18 / So Project Management and Co Individual Consult IDA / 59900 Post Limited 50,000.00 0.00 Canceled 2018-01-25 2018-01-30 2018-02-20 2018-03-27 2018-09-23 cial Safeguard Specialist ordination ant Selection MINDIVER/SS/CS-056/18 / En gagement of an Advisory Fir Facilitating Downstream Sec m to convert Analogue Datas IDA / 59900 tor Development & Enhancin Prior Direct Selection Direct 480,000.00 1,107,929.94 Under Review 2018-01-31 2018-07-23 2018-02-22 2018-08-08 2018-04-28 2019-08-05 2018-10-25 ets into Digital Format and in g Competitiveness stallation of IT infrastructure and Data systems at the Nig eria Geological Survey Agenc y MINDIVER/IC/CS/017-18 / An alysis, development and impl ementation of adequate diss Establishing a Strong Found Individual Consult emination results for geoscie IDA / 59900 ation for Mining Sector Deve Post Limited 100,000.00 109,900.00 Signed 2018-03-05 2018-07-16 2018-03-10 2018-06-28 2018-03-31 2018-08-16 2018-05-05 2020-10-01 2018-11-01 ant Selection nces activities and to transfe lopment r knowledge to all interested stakeholders, via organizing seminars /conferences, MINDIVER/IC/CS/024-18 / As Facilitating Downstream Sec sesment of Recommendation Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 2018-02-19 2017-11-20 2018-02-24 2018-03-17 2018-04-21 2018-10-18 on SMDF restructuring and In ant Selection ation g Competitiveness vestment Framework MINDIVER/CQ/CS/048-18 / N ational Consultant to assist I nternational Consultant to Pr Establishing a Strong Found Individual Consult ovide technical assistance on IDA / 59900 ation for Mining Sector Deve Post Limited 75,000.00 33,676.97 Signed 2018-02-01 2018-04-24 2018-02-06 2018-04-27 2018-02-27 2019-05-07 2018-04-03 2019-04-15 2018-09-30 ant Selection the geological and mineraliza lopment tion characterisation of pegm atites with potentials of Lithi um, metals & REE in the Mini ng sector MINDIVER/IC/CS/077-18 / Na tional Consultant for the Pro motion of Mining Projects an Establishing a Strong Found Individual Consult d Facilitation of the Nigerian IDA / 59900 ation for Mining Sector Deve Post Limited 50,000.00 41,305.00 Signed 2018-08-15 2018-08-16 2018-08-29 2018-09-03 2018-09-19 2018-10-15 2018-10-24 2018-11-01 2019-04-22 ant Selection Delegation Participation in N lopment ational and International Mini ng Conferences, Workshops and Trade shows. MINDIVER/IC/CS/076-18 / En gagement of an Individual Co nsultant to Conduct Training Establishing a Strong Found Individual Consult and Capacity Building Needs IDA / 59900 ation for Mining Sector Deve Post Limited 50,000.00 0.00 Canceled 2018-08-13 2018-08-16 2018-08-27 2018-09-17 2018-10-22 2019-04-20 ant Selection Assessment to the personnel lopment of the Ministry of Mines and S teel Development and its Ag encies MINDIVER/DS/CS/078-18 / En Facilitating Downstream Sec Individual Consult gagement of Mining Cadastre IDA / 59900 tor Development & Enhancin Post Open 50,000.00 0.00 Canceled 2018-11-20 2019-01-08 2019-01-29 2019-03-05 2019-09-01 ant Selection Expert g Competitiveness MINDIVER/IC/CS/037-18 / En Facilitating Downstream Sec Individual Consult Under Implement gagement of Social Safeguar IDA / 59900 tor Development & Enhancin Post Open 50,000.00 0.00 2018-11-20 2018-12-10 2019-01-08 2019-01-29 2019-03-05 2019-09-01 ant Selection ation d Specialist for MinDiver Proj g Competitiveness ect MINDIVER/IC/CS/090-18 / En Establishing a Strong Found Individual Consult Under Implement gagement of Geological Anal IDA / 59900 ation for Mining Sector Deve Post Open 100,000.00 0.00 2018-11-30 2019-03-21 2019-01-18 2019-02-08 2019-03-15 2019-09-11 ant Selection ation yst for Mindiver Project lopment MINDIVER/SS/CS/001-18 / Up Facilitating Downstream Sec grade of the Mining Cadastre IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 30,000.00 0.00 Canceled 2019-12-01 2022-11-01 2019-12-11 2020-02-14 2020-08-12 office for Online Application - g Competitiveness SYSTEM MAINTENANCE SERV ICES MINDIVER/IC/CS/123-19 / En gagement of Consultant to pr Facilitating Downstream Sec Individual Consult epare the Grievance Redress IDA / 59900 tor Development & Enhancin Post Limited 75,000.00 0.00 Canceled 2019-05-01 2019-05-06 2019-05-27 2019-07-01 2019-12-28 ant Selection Mechanism (GRM) for the Min g Competitiveness Diver Project and the Mining Sector. MINDIVER/CQ/CS/051-17 / Pr Project Management and Co Individual Consult omotion and Export Strategis IDA / 59900 Post Limited 80,000.00 0.00 Canceled 2018-01-17 2018-01-22 2018-02-12 2018-03-19 2019-03-19 ordination ant Selection t for the Mining Sector MINDIVER/IC/CS/075-018 / In Establishing a Strong Found dividual Consultant for super Individual Consult IDA / 59900 ation for Mining Sector Deve Post Limited 25,000.00 0.00 Canceled 2018-08-13 2018-08-16 2018-08-18 2018-09-08 2018-10-13 2019-04-11 vision of renovation works of ant Selection lopment dimension stone lab of NGSA in Kaduna. NG-MINDIVER-104552-CS-IN DV / Engagement of an indivi Facilitating Downstream Sec dual Consultant to carry out Individual Consult IDA / 59900 tor Development & Enhancin Post Limited 25,000.00 0.00 Canceled 2019-05-08 2019-05-13 2019-06-03 2019-07-08 2020-01-04 needs assessment and Evalu ant Selection g Competitiveness ation of Equipment of the Nat ional Metallurgical Developm ent centre, Jos NG-MINDIVER-103076-CS-IN Facilitating Downstream Sec DV / Engagement of Individu Individual Consult IDA / 59900 tor Development & Enhancin Post Limited 45,000.00 0.00 Canceled 2019-07-01 2019-07-06 2019-07-27 2019-08-31 2020-02-27 al Consultant to carry out Ge ant Selection g Competitiveness nder impact assesment in Mi ning Sector NG-MINDIVER-114471-CS-C DS / Eengagement of a Cons ulting firm to carry out enhan Facilitating Downstream Sec cements to the Nigerian Mine IDA / 59900 tor Development & Enhancin Prior Direct Selection Direct 200,000.00 0.00 Canceled 2019-05-25 2019-06-04 2019-08-08 2020-02-04 ral Resources Decision Suppo g Competitiveness rt System (NMRDSS) includin g Transaction Areas in an Op en System Architecture NG-MINDIVER-130-CS-IC / En Facilitating Downstream Sec Individual Consult Under Implement gagement of M& E Specialist IDA / 59900 tor Development & Enhancin Post Limited 45,000.00 0.00 2019-08-30 2019-09-10 2019-09-04 2019-09-25 2019-10-30 2020-10-29 ant Selection ation for Mindiver Project g Competitiveness NG-MINDIVER-152-CS-IC / Int Facilitating Downstream Sec ernational Technical Assistan Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 2019-10-08 2019-10-21 2019-10-13 2019-12-13 2019-11-03 2019-12-08 2020-06-05 t for National Steel Raw Mate ant Selection ation g Competitiveness rial Exploration Agency (NSR MEA), Kaduna MINDIVER/IC/CS/099-19 / En Establishing a Strong Found gagement of International Co Individual Consult IDA / 59900 ation for Mining Sector Deve Post Limited 75,000.00 0.00 Canceled 2019-05-01 2019-05-28 2019-05-22 2019-06-12 2019-07-17 2020-01-13 nsultant for Quality Assuranc ant Selection lopment e of the Geodata Centre of N GSA Page 11 MINDIVER/IC/CS/073/018 / In dividual Consultant for the su pervision and quality assuran Establishing a Strong Found ce of the upgrade and autom Individual Consult IDA / 59900 ation for Mining Sector Deve Post Limited 60,000.00 0.00 Canceled 2018-07-16 2018-07-18 2018-07-26 2018-08-16 2018-09-20 2019-09-20 ation of Mining Cadastre Offi ant Selection lopment ce for online applications, e-r ecording, archiving and the e stablishment of Mining Cadas tre Offices in six geopolitical zones NG-MINDIVER-133782-CS-IN DV / Engagement of Individu al Consultant for the supervis Establishing a Strong Found ion and Quality assurance Of Individual Consult Under Implement IDA / 59900 ation for Mining Sector Deve Post Limited 100,000.00 0.00 2019-09-25 2019-10-10 2019-09-30 2019-10-21 2019-11-25 2020-05-23 the establishment of a Nigeri ant Selection ation lopment an geodata centre at NGSA and the upgrade and automa tion of MCO for online applica tions, e-recording, archiving. NG-MINDIVER-138854-CS-IN DV / Engagement of Individu Facilitating Downstream Sec Individual Consult Under Implement al Consultant for the prepara IDA / 59900 tor Development & Enhancin Post Limited 30,000.00 0.00 2019-10-15 2019-12-16 2019-10-20 2020-01-27 2019-11-10 2020-05-29 2019-12-15 2020-06-12 ant Selection ation tion of (Abbreviated) Resettl g Competitiveness ement Action Plan for Ladi K wali Pottery Centre. NG-MINDIVER-90376-CS-IND Establishing a Strong Found V / Engagement of a Consult Individual Consult IDA / 59900 ation for Mining Sector Deve Post Limited 50,000.00 0.00 Canceled 2019-01-05 2019-01-10 2019-01-31 2019-03-07 2019-09-03 ant to develop Grievance Re ant Selection lopment dress Mechanism for the Min Diver Project MINDIVER/IC/CS/072/018 / N ational Consultant to design Facilitating Downstream Sec Individual Consult and implement a strategy for IDA / 59900 tor Development & Enhancin Post Limited 60,000.00 0.00 Canceled 2018-07-16 2019-10-15 2018-07-31 2018-08-21 2018-09-25 2019-09-25 ant Selection developing Nigeria's gemsto g Competitiveness ne and jewellery industry NG-MINDIVER-147-CS-IC / En gagement of Expert Geoscie ntist to provide technical sup port and advice to the Nigeri Facilitating Downstream Sec Individual Consult an Geological Survey Agency IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 124,620.00 Signed 2019-08-30 2020-10-27 2019-09-04 2020-12-18 2019-09-25 2021-02-01 2019-10-30 2021-05-01 2020-04-27 ant Selection (NGS)- Consultancy for Geolo g Competitiveness gical Advisory Services (TA E mbedded) for the mining and Steel Sector (NGSA)- (Techni cal Advisor for NGSA) NG-MINDIVER-147922-CS-C Project Management and Co DS / Engagement of Procure IDA / 59900 Prior Direct Selection Direct 85,000.00 105,385.06 Signed 2020-01-01 2019-12-23 2020-01-11 2019-12-15 2020-03-16 2020-01-01 2021-12-31 ordination ment Specialist for Mindiver Project NG-MINDIVER-147926-CS-C DS / Engagement of Monitori Project Management and Co IDA / 59900 Prior Direct Selection Direct 85,000.00 106,982.79 Signed 2019-12-16 2019-12-23 2019-12-26 2019-12-15 2020-02-29 2020-01-01 2021-12-31 ng and Evaluation Specialist f ordination or Mindiver Project NG-MINDIVER-147927-CS-C Facilitating Downstream Sec DS / Engagement of Technica IDA / 59900 tor Development & Enhancin Prior Direct Selection Direct 100,000.00 184,450.00 Signed 2019-12-01 2019-12-19 2019-12-11 2019-12-15 2020-02-14 2020-01-01 2021-12-31 l Advisor for Mindiver Project g Competitiveness NG-MINDIVER-147928-CS-C Facilitating Downstream Sec DS / Engagement of Mineral IDA / 59900 tor Development & Enhancin Prior Direct Selection Direct 85,000.00 105,385.06 Signed 2019-12-18 2019-12-19 2019-12-28 2019-12-15 2020-03-02 2020-01-01 2021-12-31 Sector Policy and Governanc g Competitiveness e Advisor NG-MINDIVER-145-CS-IC / En gagement of an Individual Co nsultant for the Supervision a Facilitating Downstream Sec Individual Consult Under Implement nd Quality Assurance of the IDA / 59900 tor Development & Enhancin Post Limited 60,000.00 0.00 2019-12-12 2020-01-09 2019-12-17 2020-01-20 2020-01-07 2021-08-20 2020-02-11 2021-02-10 ant Selection ation Design and implementation o g Competitiveness f a Strategy for the Develop ment of Nigeria’sGemstone a nd Jewellery Industry NG-MINDIVER-128772-CS-IN Facilitating Downstream Sec Individual Consult DV / Engagement of Geoscie IDA / 59900 tor Development & Enhancin Post Open 100,000.00 0.00 Canceled 2019-12-15 2020-02-02 2020-02-23 2020-03-29 2020-05-04 ant Selection nce Advisor for the Mindiver g Competitiveness Project MINDIVER/IC/CS/98-19 / Con Facilitating Downstream Sec Individual Consult sultant Geologist to asssist M IDA / 59900 tor Development & Enhancin Post Limited 100,000.00 0.00 Canceled 2019-05-01 2019-04-05 2019-05-06 2019-05-27 2019-07-01 2019-12-28 ant Selection MSD on Geology and GIS g Competitiveness NG-MINDIVER-138853-CS-IN DV / Engagement of Individu Facilitating Downstream Sec Individual Consult al Geophycist to assist the Mi IDA / 59900 tor Development & Enhancin Prior Direct 180,000.00 0.00 Canceled 2019-10-31 2019-11-10 2019-12-01 2020-01-05 2021-01-04 ant Selection nistry of Mines and Steel Dev g Competitiveness elopment (MMSD) on Geolog y and GIS NG-MINDIVER-151182-CS-IN DV / Engagement of an exper Establishing a Strong Found t Consultant to develop a str Individual Consult Under Implement IDA / 59900 ation for Mining Sector Deve Post Open 45,000.00 0.00 2020-01-14 2020-01-09 2020-03-03 2020-03-24 2020-04-28 2020-10-25 ategy for the development of ant Selection ation lopment baryte production, processin g and marketing in the minin g and steel sector NG-MINDIVER-147932-CS-C Facilitating Downstream Sec DS / Engagement of a Consul Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Direct 110,000.00 0.00 2020-01-14 2020-01-09 2020-01-24 2019-11-15 2020-02-14 2020-01-15 2020-03-20 2021-03-20 tant Expert Geoscientist to a ant Selection ation g Competitiveness ssist MMSD on Geology and GIS. NG-MINDIVER-156383-CS-IN Facilitating Downstream Sec Individual Consult Under Implement DV / Engagement of Procure IDA / 59900 tor Development & Enhancin Post Limited 50,000.00 0.00 2020-01-31 2020-09-01 2020-02-05 2020-02-26 2020-04-01 2021-03-27 ant Selection ation ment Consultant for Mindiver g Competitiveness Project NG-MINDIVER-148367-CS-IN DV / Engagement of Individu al consultant to undertake th Facilitating Downstream Sec e preparation of Environment Individual Consult IDA / 59900 tor Development & Enhancin Post Limited 45,000.00 34,577.80 Signed 2020-02-25 2020-03-04 2020-03-01 2020-03-05 2020-03-22 2020-03-25 2020-04-26 2020-04-21 2020-06-25 al and Social Management Pl ant Selection g Competitiveness an (ESMPs) for the rehabilitat ion and construction works of priority infrastructures in Nig er, Kaduna and Plateau State s. NG-MINDIVER-156800-CS-IN DV / Engagement of an Indivi Facilitating Downstream Sec dual Consultant to develop a Individual Consult IDA / 59900 tor Development & Enhancin Post Direct 100,000.00 0.00 Canceled 2020-02-05 2020-02-15 2020-03-07 2020-04-11 2020-10-08 strategy for the development ant Selection g Competitiveness of barite production, processi ng and marketing in Nigeria. Page 12 NG-MINDIVER-165582-CS-IN Facilitating Downstream Sec Individual Consult Under Implement DV / Engagement of Social S IDA / 59900 tor Development & Enhancin Post Direct 55,000.00 0.00 2020-04-30 2020-04-15 2020-05-10 2020-04-17 2020-05-31 2020-07-05 2021-01-01 ant Selection ation afeguard Specialist for MinDi g Competitiveness ver Project NG-MINDIVER-165583-CS-IN Facilitating Downstream Sec Individual Consult Under Implement DV / Engagement of Environ IDA / 59900 tor Development & Enhancin Post Direct 55,000.00 0.00 2020-04-30 2020-04-15 2020-05-10 2020-05-31 2020-07-05 2021-01-01 ant Selection ation mental Specialist for Mindive g Competitiveness r Project NG-MINDIVER-165592-CS-IN DV / Engagement of Internati Facilitating Downstream Sec onal Individual Consultant to Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Open 175,000.00 0.00 2020-04-15 2020-06-12 2020-06-03 2020-06-24 2020-07-29 2021-01-25 develop a strategy for the De ant Selection ation g Competitiveness velopment of Gemstone and Jewellery trading and Marketi ng platform MINDIVER-CDS-CS--046-202 0 / Consulting services for th Project Management and Co Under Implement IDA / 59900 Prior Direct Selection Direct 850,000.00 0.00 2020-03-19 2020-05-07 2020-03-29 2020-05-15 2020-06-02 2020-11-29 e engagement of project ma ordination ation nagement firm for the projec t management unit NG-MINDIVER-168712-CS-IN DV / Engagement of National Facilitating Downstream Sec Individual Consult Under Implement Consultant to develop a strat IDA / 59900 tor Development & Enhancin Post Open 75,000.00 0.00 2020-05-12 2020-12-20 2020-06-30 2021-02-02 2020-07-21 2021-02-02 2020-08-25 2021-08-25 ant Selection ation egy for the Development of g Competitiveness Gemstone and Jewellery tradi ng and Marketing platform NG-MINDIVER-133-CS-CDS / Engagement of firm for the M Facilitating Downstream Sec anagement, Maintenance an IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 200,000.00 0.00 Canceled 2019-10-04 2019-10-14 2019-12-18 2020-06-15 d integration of all Data syst g Competitiveness em for the Mining Sector. NG-MINDIVER-146-CS-IC / Pr Facilitating Downstream Sec ocurement of Consultant to p Individual Consult IDA / 59900 tor Development & Enhancin Post Limited 60,000.00 0.00 Canceled 2019-08-30 2019-09-04 2019-09-25 2019-10-30 2020-04-27 rovide MMSD Advisory servic ant Selection g Competitiveness es on change management NG-MINDIVER-184767-CS-C DS / Consulting firm to carry out enhancements to the Nig Facilitating Downstream Sec erian Mineral Resources Deci IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 200,000.00 346,843.83 Signed 2020-08-05 2021-04-01 2020-08-15 2021-04-16 2020-10-19 2021-07-25 2021-10-19 sion Support System (NMRDS g Competitiveness S) including Transaction Area s in an Open System Architec ture- NG-MINDIVER-200691-CS-IN DV / Consultancy to design a Facilitating Downstream Sec nd implement safer and clea Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Limited 120,000.00 0.00 2020-11-24 2020-10-27 2020-11-29 2020-12-20 2021-01-24 2021-10-21 ner mining programmes, effi ant Selection ation g Competitiveness cient technologies and practi ces in the mining and steel s ector NG-MINDIVER-200701-CS-C Facilitating Downstream Sec DS / Engagement of Technica Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Direct 55,000.00 0.00 2020-10-29 2020-10-27 2020-11-08 2020-11-29 2021-01-03 2021-07-02 l advisor to the Ministry of Mi ant Selection ation g Competitiveness nes and Steel Development o n Mindiver affairs. NG-MINDIVER-200708-CS-IN Project Management and Co Individual Consult Under Implement DV / Extension of contract for IDA / 59900 Post Direct 70,000.00 0.00 2020-10-23 2020-10-27 2020-11-02 2020-11-23 2020-12-28 2022-03-28 ordination ant Selection ation the National Technical Adviso r for Mindiver NG-MINDIVER-210843-CS-IN DV / Engagement of Consulta nt for the Assessment of Con flicts associated with mining Facilitating Downstream Sec Individual Consult operations and its impacts to IDA / 59900 tor Development & Enhancin Post Limited 120,000.00 73,573.30 Signed 2021-01-21 2021-02-04 2021-02-04 2021-02-05 2021-02-25 2021-03-28 2021-04-01 2021-04-23 2021-09-28 ant Selection the host mining communities g Competitiveness in selected Geopolitical zone s with an emphasis on failed Community Development (C D) implementation NG-MINDIVER-211128-CS-C Facilitating Downstream Sec DS / Engagement of consulta Under Implement IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 40,000.00 0.00 2021-01-24 2021-01-29 2021-02-03 2021-02-04 2021-04-09 2021-10-06 nt for the management of da ation g Competitiveness shboard and asset register fo r Mindiver project NG-MINDIVER-211138-CS-IN DV / Contract Extension-Enga Facilitating Downstream Sec gement of Technical Advisor Individual Consult Pending Impleme IDA / 59900 tor Development & Enhancin Post Direct 195,000.00 0.00 2021-01-01 2021-01-11 2021-02-01 2021-03-08 2021-09-04 (General Purpose) to the Gov ant Selection ntation g Competitiveness ernment of Nigeria for the “M inDiver” Project- John Eyre NG-MINDIVER-211146-CS-IN DV / Extention of contract - E ngagement of a Consultant f Facilitating Downstream Sec or the Promotion of Mining Pr Individual Consult Pending Impleme IDA / 59900 tor Development & Enhancin Post Direct 130,000.00 0.00 2021-01-01 2021-01-11 2021-02-01 2021-03-08 2021-09-04 ojects and Facilitation of the ant Selection ntation g Competitiveness Nigerian Delegation Participa tion in International Mining C onferences, Workshops, and Trade shows - Emma Kinder NG-MINDIVER-211148-CS-IN DV / Extension of Services for Facilitating Downstream Sec Consultant Expert Geologist t Individual Consult Pending Impleme IDA / 59900 tor Development & Enhancin Post Direct 140,000.00 0.00 2021-01-01 2021-01-11 2021-02-01 2021-03-08 2021-09-04 o assist the Project and the M ant Selection ntation g Competitiveness inistry of Mines and Steel De velopment (MMSD) on Geolo gy and GIS- Francisco Iguala da NG-MINDIVER-211934-CS-IN DV / Consultancy services to support the NMCT in establis Facilitating Downstream Sec Individual Consult Under Implement hing an incorporated Trust a IDA / 59900 tor Development & Enhancin Post Limited 70,000.00 0.00 2021-01-29 2021-07-15 2021-02-12 2021-03-05 2021-04-09 2021-10-06 ant Selection ation nd the enhancement of down g Competitiveness stream mineral processing fo r Ladi kwali pottery centre, S uleja Niger State NG-MINDIVER-211134-CS-C DS / Extension of Consultanc Facilitating Downstream Sec Under Implement y services for the provision of IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 450,000.00 0.00 2021-02-14 2021-02-12 2021-02-24 2021-01-15 2021-04-30 2021-06-05 ation Project Management office fu g Competitiveness nction for the Mindiver Projec t -Ernst and Young Page 13 NG-MINDIVER-200705-NC-RF B / Engagement of a Consult ant to conduct a needs asses sment and implementation of Establishing a Strong Found Under Implement Accreditation/Certification of IDA / 59900 ation for Mining Sector Deve Prior Direct Selection Direct 700,000.00 0.00 2021-02-15 2021-02-25 2021-03-06 2021-03-02 2021-05-10 2021-11-06 ation the National Geosciences Re lopment search Laboratory (NGRL) Ce ntre Kaduna for the attainme nt of ISO 9001 and 17025 sta ndards including Capacity Bu ilding. NG-MINDIVER-216702-CS-IN Facilitating Downstream Sec DV / Engagement of an indivi Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Open 75,000.00 0.00 2021-03-02 2021-06-28 2021-04-20 2021-05-11 2021-06-15 2022-06-15 dual National Consultant for t ant Selection ation g Competitiveness he Topomaps Mapping activit y NG-MINDIVER-216699-CS-IN Facilitating Downstream Sec DV / Engagement of Individu Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Open 75,000.00 0.00 2021-03-02 2021-06-28 2021-04-20 2021-05-11 2021-06-15 2022-06-15 al National Consultant for the ant Selection ation g Competitiveness Airborne Geophysical Survey activity. NG-MINDIVER-234529-CS-IN DV / ENGAGEMENT OF INDIVI DUAL CONSULTANT TO PROV Facilitating Downstream Sec Individual Consult Under Implement IDE SUSTAINABLE POTTERY A IDA / 59900 tor Development & Enhancin Post Open 75,000.00 0.00 2021-07-25 2021-09-01 2021-09-12 2021-09-02 2021-10-03 2021-11-07 2022-05-06 ant Selection ation DVISORY SERVICE, PRODUCT g Competitiveness ION, AND TRAINING ADVISOR Y SERVICES FOR THE LADI K WALI POTTERY CENTER NG-MINDIVER-234527-CS-IN DV / engagement of an Indivi dual Consultant for Independ ent Peer Review of the Upgra Facilitating Downstream Sec Individual Consult Under Implement de and Automation of Mining IDA / 59900 tor Development & Enhancin Post Limited 50,000.00 0.00 2021-07-05 2021-07-04 2021-07-10 2021-07-31 2021-09-04 2021-12-03 ant Selection ation Cadastre Office for Online Ap g Competitiveness plications, E-recording, Archi ving and Establishment of Mi ning Cadastre Offices in the Six Geopolitical Zones NG-MINDIVER-234528-CS-IN Facilitating Downstream Sec DV / Engagement of an indivi Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Open 75,000.00 0.00 2021-07-18 2021-07-15 2021-09-05 2021-09-26 2021-10-31 2022-04-29 dual heritage advisor for Ladi ant Selection ation g Competitiveness kwali Pottery centre NG-MINDIVER-278432-CS-IN Facilitating Downstream Sec DV / Engagement of external Individual Consult Under Implement IDA / 59900 tor Development & Enhancin Post Limited 30,000.00 0.00 2022-02-28 2022-02-22 2022-03-05 2022-03-07 2022-03-26 2022-04-30 2022-10-27 Consultant for the audit of th ant Selection ation g Competitiveness e Ladi Kwali ARAP implement ation document NG-MINDIVER-278433-CS-C DS / Provision of Support, Mai ntenance and coordination a Facilitating Downstream Sec greement for ICT Hardware f Under Implement IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 25,000.00 0.00 2022-02-28 2022-03-29 2022-03-10 2022-05-14 2023-05-14 or the Formalisation of Artisa ation g Competitiveness nal Miners & Remote sensing activity located Abuja- (Service Level Agreement co ntract-SLA). NG-MINDIVER-278434-CS-C DS / Provision of Support, Mai ntenance and coordination a Facilitating Downstream Sec Under Implement greement for ICT Hardware f IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 25,000.00 0.00 2022-02-28 2022-03-29 2022-03-10 2022-05-14 2023-05-14 ation or the Establishment of Geod g Competitiveness ata Centre – Abuja and Kadu na- (Service Level Agreemen t contract). NG-MINDIVER-278441-DS-RF P / Engagement of firm for ch Facilitating Downstream Sec ange management and capa Under Implement IDA / 59900 tor Development & Enhancin Post Direct Selection Direct 400,000.00 0.00 2022-06-08 2022-06-03 2022-06-18 2022-04-13 2022-08-22 2023-02-18 bility transfer in the Ministry ation g Competitiveness of Mines and Steel Developm ent (MMSD) to ensure sustain ability of MinDiver activities. NG-MINDIVER-338874-CS-C DS / Engagement of a Nation al Consulting Firm for the Bat Facilitating Downstream Sec ch 3 Master training in Jewell Under Implement IDA / 59900 tor Development & Enhancin Post Direct Selection Direct - National 350,000.00 0.00 2023-02-20 2023-02-15 2023-03-02 2023-05-06 2023-11-02 ery making and design and t ation g Competitiveness he implementation of a Traini ng Programme for the Devel opment of Nigeria’s Gemston e and Jewellery Industry NG-MINDIVER-358963-CS-C Project Management and Co DS / Procurement of Financia IDA / 59900 Post Direct Selection Direct - National 10,000.00 0.00 Under Review 2023-04-27 2023-05-11 2023-05-07 2023-07-11 2023-09-09 ordination l Management Specialist NG-MINDIVER-361260-CS-IN Facilitating Downstream Sec DV / Procurement of a Consul Individual Consult Pending Impleme IDA / 59900 tor Development & Enhancin Post Limited 50,000.00 0.00 2023-05-31 2023-06-05 2023-06-26 2023-07-31 2024-01-27 tant to carry out an Environm ant Selection ntation g Competitiveness ental and social audit of the Mindiver Project. NG-MINDIVER-361298-CS-C DS / Engagement of consulta nt for the update and implem entation of the Mindiver grie Facilitating Downstream Sec vance redress mechanism (M IDA / 59900 tor Development & Enhancin Post Direct Selection Direct - National 75,000.00 0.00 Under Review 2023-05-18 2023-05-31 2023-05-28 2023-08-01 2024-01-28 -GRM) to a sector-fit GRM an g Competitiveness d undertake the pilot implem entation of citizen’s engage ment and social accountabilit y integration in the mining se ctor. Page 14 PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western and Central Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western and Central Africa 2018-02-19 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / V1150, IDA / D2860, IDA / 62130, TF / A7130, TF / A7131 Ministry of Environnement/Directorate of Environment Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 39 / Aménagement de burea Component 4: National Coor Single Stage - One E 2019-02-2 ux pour l’unité de gestion du IDA / V1150 Post Request for Bids Open - National 90,000.00 81,133.59 Terminated 2018-05-07 2018-04-06 2018-05-12 2018-06-23 2018-05-07 2018-07-23 2018-05-26 2018-08-27 2018-08-29 dination nvelope 3 projet WACA 59 / Travaux d'aménagemen t du R+1 des bureaux pour l' UGP, Construction du mur de séparation, d'un parking pour Component 4: National Coor Single Stage - One E 2020-04-1 IDA / D2860 Post Request for Bids Open - National 190,000.00 0.00 Canceled 2019-06-27 2019-07-02 2019-08-13 2019-09-12 2019-10-17 10 voitures, un poste d'héber dination nvelope 4 gement (des compteurs et d u groupe électrogène) et am énagement de la cour (aires de circulation et jardin) 85 / Travaux d’aménagemen t de la cour du Ministère de l' Component 2: Strengthening Request for Quota Single Stage - One E 2021-01-1 environnement, du développ IDA / D2860 the Policy and Institutional F Post Limited 105,000.00 126,079.40 Signed 2020-05-19 2020-04-24 2020-07-14 2020-08-29 tions nvelope 0 ement durable et de la prote ramework ction de la nature - en un (01 ) lot 114 / Travaux de constructio n de la clôture de la direction Component 4: National Coor Request for Quota Single Stage - One E 2020-12-0 IDA / D2860 Post Open - National 70,000.00 55,047.27 Signed 2020-07-14 2020-09-08 2022-02-19 régionale des forestiers de la dination tions nvelope 8 réserve de Togodo Nord à AT AKPAME 88 / Travaux d'aménagemen Component 4: National Coor Request for Quota Single Stage - One E 2021-03-0 t du R+1 des bureaux pour l' IDA / D2860 Post Limited 152,728.00 0.00 Signed 2020-07-12 2020-07-16 2020-09-06 dination tions nvelope 5 UGP WACA ResIP, en lot uniq ue 104 / Travaux de protection Component 3: Strengthening d’urgence de la côte par la te 2021-02-1 IDA / D2860 National Physical and Social Post Direct Selection Direct 909,090.90 899,211.65 Signed 2020-07-08 2020-07-03 2020-07-13 2020-08-19 2020-08-17 2020-09-18 chnique de juxtaposition de p 3 Investments uits en fûs granulitique. TG-WACA TOGO-204668-CW Component 3: Strengthening Request for Quota Single Stage - One E 2021-04-1 -RFQ / Construction de deux ( TF / A7131 National Physical and Social Post Limited 30,000.00 0.00 Canceled 2021-01-20 2021-03-18 tions nvelope 7 02) bâtiments à TOGODO Investments TG-WACA TOGO-204671-CW Component 3: Strengthening -RFQ / Travaux de constructi Request for Quota Single Stage - One E 2021-09-1 TF / A7130 National Physical and Social Post Limited 60,000.00 0.00 Canceled 2021-01-25 2021-03-22 on de deux (02) étangs et de tions nvelope 8 Investments deux (02) forages à TOGODO 92 / Travaux de construction Component 2: Strengthening Request for Quota Single Stage - One E 2021-02-2 IDA / D2860 Post Limited 106,000.00 0.00 Canceled 2020-07-01 2020-08-26 du siège de l'ANGE the Policy and Institutional F tions nvelope 2 ramework TG-WACA TOGO-239069-CW National Procure -RFQ / Travaux d'aménagem Component 2: Strengthening ment Document - ent (réhabilitation) de la salle Request for Quota Single Stage - One E 2022-02-1 IDA / D2860 the Policy and Institutional F Post Limited 1 Envelope proce 30,000.00 0.00 Signed 2021-09-20 2022-04-26 2021-11-15 de vidéo conférence du progr tions nvelope 3 ramework ss (Non Bank-SPD amme de licence en océano ) graphie de l'université de Kar a TG-WACA TOGO-239044-CW National Procure -RFB / TRAVAUX DE CONSTR Component 3: Strengthening ment Document - Single Stage - One E 2022-07-2 UCTION DES UNITES DE TRA IDA / D2860 National Physical and Social Post Request for Bids Open - National 1 Envelope proce 937,389.00 653,009.74 Signed 2021-10-15 2021-08-09 2021-10-20 2021-11-19 2021-11-02 2021-12-19 2021-11-13 2022-01-23 2022-03-29 nvelope 2 NSFORMATIONS DANS LES A Investments ss (Non Bank-SPD GR PILOTES EN SEPT (07) LO ) TS TG-WACA TOGO-255574-CW -RFB / TRAVAUX DE CONSTR UCTION ET DE REHABILITATI National Procure ON DE CABINES DE TOILETT Component 3: Strengthening ment Document - Single Stage - One E 2022-06-0 ES EQUIPES DE DISPOSITIFS IDA / D2860 National Physical and Social Post Request for Bids Open - National 1 Envelope proce 177,273.00 192,765.13 Signed 2021-10-29 2021-08-09 2021-11-03 2021-12-03 2021-11-03 2022-01-02 2021-11-14 2022-02-06 2022-05-07 nvelope 6 DE LAVE-MAIN DANS LES EC Investments ss (Non Bank-SPD OLES, ET DE CONSTRUCTION ) DE TOILETTES ECOSAN DANS LES MENAGES DE LA COMMU NE DES LACS 1( en 04 lots) TG-WACA TOGO-222964-CW National Procure -RFQ / renforcement (travaux Component 3: Strengthening ment Document - Request for Quota Single Stage - One E 2022-07-2 de réhabilitation) du poste se IDA / D2860 National Physical and Social Post Open - National 1 Envelope proce 109,000.00 0.00 Canceled 2021-11-02 2022-01-25 tions nvelope 4 cours d'urgence (PSR) du cor Investments ss (Non Bank-SPD ps des sapeurs - pompiers de ) la Région de Lomé Nord TG-WACA TOGO-239057-CW National Procure -RFB / construction de trois ( Component 2: Strengthening ment Document - 03) postes de relais forestier Single Stage - One E 2022-06-0 TF / A7130 the Policy and Institutional F Post Request for Bids Open - National 1 Envelope proce 90,000.00 0.00 Canceled 2021-10-25 2021-10-30 2021-11-29 2021-12-29 2022-02-02 s équipés de panneaux solair nvelope 2 ramework ss (Non Bank-SPD es et de forages à motricité h ) umaine dans le complexe d’a ires protégées de Togodo. Request for Bids - TG-WACA TOGO-239048-CW Component 2: Strengthening Single Stage - One E Small Works SPD 2022-07-0 -RFB / Réhabilitation de la br TF / A7130 the Policy and Institutional F Post Request for Bids Open - National 100,000.00 0.00 Canceled 2021-10-29 2021-11-03 2021-12-03 2022-01-02 2022-02-06 nvelope (1 envelope proce 6 igade de Togodo Nord ramework ss) National Procure TG-WACA TOGO-255877-CW Component 3: Strengthening ment Document - Request for Quota Single Stage - One E 2022-07-2 -RFQ / Réhabilitation de la bri TF / A7130 National Physical and Social Post Limited 1 Envelope proce 100,000.00 105,469.51 Signed 2021-12-05 2021-11-10 2022-01-30 2022-04-16 tions nvelope 9 gade de Togodo Nord Investments ss (Non Bank-SPD ) TG-WACA TOGO-255863-CW National Procure -RFQ / renforcement (travaux Component 3: Strengthening ment Document - Request for Quota Single Stage - One E 2022-05-1 de réhabilitation) du poste se IDA / D2860 National Physical and Social Post Limited 1 Envelope proce 109,000.00 93,880.49 Signed 2021-11-20 2021-11-10 2022-01-15 2022-04-16 tions nvelope 5 cours d'urgence (PSR) du cor Investments ss (Non Bank-SPD ps des sapeurs - pompiers de ) la Région de Lomé Nord Page 1 TG-WACA TOGO-255873-CW National Procure -RFQ / construction de trois ( Component 3: Strengthening ment Document - Request for Quota Single Stage - One E Under Imple 2022-07-1 03) postes de relais forestier TF / A7130 National Physical and Social Post Limited 1 Envelope proce 90,000.00 0.00 2021-11-24 2022-04-14 2022-01-19 tions nvelope mentation 8 s équipés de panneaux solair Investments ss (Non Bank-SPD es dans le complexe d’aires ) protégées de Togodo. TG-WACA TOGO-238677-CW National Procure -RFB / Construction de toilett Component 3: Strengthening ment Document - Single Stage - One E 2022-03-1 e dans les ménages (12 lots) IDA / D2860 National Physical and Social Post Request for Bids Open - National 1 Envelope proce 177,273.00 0.00 Canceled 2021-08-03 2021-08-08 2021-09-07 2021-10-07 2021-11-11 nvelope 1 et dans les écoles en six (06) Investments ss (Non Bank-SPD lots soit en 18 lots au total ) TG-WACA TOGO-204666-CW Component 3: Strengthening Single Stage - One E 2021-08-1 -RFB / Réhabilitation de 90 k TF / A7130 National Physical and Social Post Request for Bids Open - National 210,606.00 0.00 Canceled 2021-01-06 2021-01-11 2021-02-10 2021-03-12 2021-04-16 nvelope 4 m de piste, 7 ponceaux et 15 Investments radiers à Togodo National Procure TG-WACA TOGO-276081-CW ment Document - Component 4: National Coor Request for Quota Single Stage - One E Under Imple 2023-03-0 -RFQ / Aménagement de la c IDA / D2860 Post Limited 1 Envelope proce 54,546.00 0.00 2022-07-11 2022-07-18 2022-09-05 dination tions nvelope mentation 4 our et d'un parking de l'UGP ss (Non Bank-SPD WACA ResIP ) TG-WACA TOGO-238692-CW National Procure -RFB / Construction de forage Component 3: Strengthening ment Document - (dans les préfectures de Yoto Single Stage - One E 2023-04-0 IDA / D2860 National Physical and Social Post Request for Bids Open - National 1 Envelope proce 231,090.00 0.00 Signed 2022-08-31 2021-08-18 2022-09-05 2022-10-05 2022-04-21 2022-11-04 2022-09-02 2022-12-09 , Bas-Mono, Lacs, Vo, Avé, Zi nvelope 8 Investments ss (Non Bank-SPD o et Golfe) pour les sous-proj ) ets communautaire en cinq ( 05) lots TG-WACA TOGO-262261-CW Component 3: Strengthening Request for Quota -RFQ / construction et équipe Request for Quota Single Stage - One E Pending Imp 2022-11-2 TF / A7130 National Physical and Social Post Limited tions (Non Bank-S 20,000.00 0.00 2022-08-29 2022-10-24 ment de trois forages dans le tions nvelope lementation 3 Investments PD) complexe forestier de Togod o TG-WACA TOGO-290356-CW -RFQ / TRAVAUX DE CURAGE Component 3: Strengthening Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-05-2 DE LA MARE A TOMETY KOND TF / A7130 National Physical and Social Post Limited tions (Non Bank-S 128,000.00 0.00 2022-10-05 2022-11-30 tions nvelope lementation 9 JI ET DE CONSTRUCTION DE Investments PD) DEUX 02 ETANGS DANS LA F ORET TG-WACA TOGO-290370-CW Request for Quota Component 4: National Coor Request for Quota Single Stage - One E Pending Imp 2023-05-2 -RFQ / Travaux d'extension R IDA / D2860 Post Limited tions (Non Bank-S 150,000.00 0.00 2022-10-03 2022-11-28 dination tions nvelope lementation 7 +2 du Bâtiment de la Coordi PD) nation nationale TG-WACA TOGO-265124-CW Request for Bids - Component 3: Strengthening -RFB / Réhabilitation de pist Single Stage - One E Works French Civi 2023-06-1 TF / A7130 National Physical and Social Post Request for Bids Open - National 1,145,500.00 0.00 Signed 2022-08-24 2022-08-29 2022-08-29 2022-10-10 2022-09-21 2022-11-09 2022-10-07 2022-12-14 e, construction de ponceaux nvelope l Law (French) SP 2 Investments et radiers à Togodo D TG-WACA TOGO-306588-CW Component 3: Strengthening Request for Quota Request for Quota Single Stage - One E 2023-03-3 -RFQ / Construction de la Brig IDA / D2860 National Physical and Social Post Limited tions (Non Bank-S 120,000.00 0.00 Signed 2022-10-05 2022-10-11 2022-11-30 tions nvelope 0 ades Forestières de Togodo S Investments PD) ud TG-WACA TOGO-313426-CW Request for Bids - -RFB / TRAVAUX DE CURAGE Component 3: Strengthening Open - Internationa Single Stage - One E Works (without pr Under Imple 2023-04-1 MÉCANIQUE ET DE RESTAUR IDA / 62130 National Physical and Social Post Request for Bids 7,289,738.00 0.00 2022-11-30 2022-10-24 2022-12-05 2022-11-07 2023-01-16 2022-12-22 2023-02-15 2023-03-02 2023-03-23 l nvelope equalification) SP mentation 9 ATION DES ECOSYSTEMES A Investments D SSOCIES DU CHENAL DE GBA GA TG-WACA TOGO-313517-CW Component 3: Strengthening Request for Quota Request for Quota Single Stage - One E Under Imple 2023-06-2 -DIR / TRAVAUX DE RÉHABILI IDA / 62130 National Physical and Social Post Limited tions (Non Bank-S 72,000.00 0.00 2022-11-02 2022-09-27 2022-12-28 tions nvelope mentation 6 TATION DE L'EPP AGBODRAF Investments PD) O National Procure TG-WACA TOGO-276078-CW Component 2: Strengthening ment Document - Request for Quota Single Stage - One E Under Imple 2023-02-0 -RFB / construction de la dire TF / A7130 the Policy and Institutional F Post Limited 1 Envelope proce 145,455.00 0.00 2022-06-13 2022-08-08 tions nvelope mentation 4 ctions préfectorale de Vo ramework ss (Non Bank-SPD ) TG-WACA TOGO-355573-CW -RFQ / achèvement des trava Request for Quota Component 4: National Coor Request for Quota Single Stage - One E Pending Imp 2024-01-2 ux de clôture de la direction r IDA / D2860 Post Limited tions (Non Bank-S 60,000.00 0.00 2023-06-04 2023-07-30 dination tions nvelope lementation 6 égionale de l'environnement PD) et des ressources forestières plateaux TG-WACA TOGO-355341-CW Component 3: Strengthening Request for Quota -RFQ / PRÉPARATION DU SOL Request for Quota Single Stage - One E Under Imple 2023-08-2 TF / A7130 National Physical and Social Post Limited tions (Non Bank-S 150,000.00 0.00 2023-05-29 2023-07-24 ET LABOUR MÉCANIQUE POU tions nvelope mentation 3 Investments PD) R LE REBOISEMENT PAR L'OD EF ET LA MAIRIE Vo3 Request for Quota TG-WACA TOGO-364034-CW Component 3: Strengthening Request for Quota Single Stage - One E tions - Small Work Pending Imp 2023-11-2 -RFQ / ENLÈVEMENT DE FUTS IDA / 62130 National Physical and Social Post Limited 126,000.00 0.00 2023-08-05 2023-09-30 tions nvelope s (Emergency) SP lementation 9 EN BÉTON NON ARME A ADIS Investments D -Competitive SEM GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 35 / Acquisition de matériels Component 4: National Coor Request for Quota Single Stage - One E IDA / V1150 Post Limited 15,000.00 0.00 Canceled 2018-05-13 2018-07-08 2019-01-04 informatiques dination tions nvelope 37 / Acquisition du mobilier Component 4: National Coor Request for Quota Single Stage - One E IDA / V1150 Post Limited 25,000.00 23,847.22 Signed 2018-07-17 2018-09-03 2018-09-11 2018-10-25 2019-03-10 de bureau pour la coordinatio dination tions nvelope n du projet 34 / Achat de fournitures de bureau, matériels de bureau et matériels d'entretien de b ureau en 03 lots. Component 4: National Coor Request for Quota Single Stage - One E Lot 1 fournitures de bureau ( IDA / V1150 Post Limited 10,000.00 7,637.09 Signed 2018-02-03 2018-02-16 2018-03-31 2018-08-08 2018-09-27 dination tions nvelope papiers rames, bics,..) Lot 2 matériels de bureau (re liure) et Lot 3 matériels d'entretien d e bureau (gel désinfectant, ... ). 35 BIS / Acquisition de fourni tures informatiques et de ma tériels informatiques en 02 lo ts : Lot 1 fournitures informat Component 4: National Coor Request for Quota Single Stage - One E IDA / V1150 Post Limited 27,000.00 26,469.61 Signed 2018-01-09 2018-01-11 2018-03-06 2018-08-08 2018-09-02 iques (cartouches d'encre, an dination tions nvelope tivirus, disques durs) et Lot 2 matériels informatiques (or dinateurs de bureau, ordinat eurs portables, scanners ..) Page 2 41BIS / Le matériel roulant s era composé comme suit : Lo t 1: 2 pick-up 4x4 double cab Component 4: National Coor Request for Quota Single Stage - One E IDA / D2860 Post Limited 294,000.00 113,114.60 Signed 2019-04-20 2019-10-10 2019-06-15 2020-05-27 2019-12-12 ine tropicalisés pour les missi dination tions nvelope ons de terrain, Lot2: 01 stati on wagon , Lot3: 01 mini bus. 65 / Acquisition de matériel r Component 4: National Coor Request for Quota Single Stage - One E oulant (moto) pour les 7 CPD TF / A7130 Post Limited 40,000.00 0.00 Canceled 2019-07-01 2019-08-26 2020-02-22 dination tions nvelope D et le coursier de l'UGP 66 / Acquisition de GPS pour Component 4: National Coor Request for Quota Single Stage - One E les CPDD (07) et l'unité de ge TF / A7130 Post Limited 20,000.00 0.00 Signed 2019-07-02 2019-09-10 2019-08-27 2020-02-23 dination tions nvelope stion du projet (5) soit au tot al 12 GPS 58 / Acquisition de matériel et fourniture informatique po ur le projet (Ordinateur burea u +portable en poste de trav, Component 4: National Coor Request for Quota Single Stage - One E IDA / D2860 Post Limited 50,000.00 0.00 Canceled 2019-06-16 2019-08-11 2020-02-07 copieur, imprimante couleur, dination tions nvelope blanc noir, clé USB multi copi eur, disque dure, vidéo proje cteur, onduleurs, modem pou r connexion Wifi, camera... 74 / Acquisition de 2 véhicul Component 2: Strengthening Request for Quota Single Stage - One E es de terrain pour l'Agence N IDA / D2860 the Policy and Institutional F Post Limited 85,000.00 0.00 Canceled 2019-06-26 2019-08-21 2020-02-17 tions nvelope ationale de Gestion de l'Envir ramework onnement 98 / Production des supports Component 4: National Coor Request for Quota Single Stage - One E IDA / D2860 Post Open - National 36,364.00 16,660.05 Signed 2020-04-14 2020-06-09 2021-05-15 2020-12-06 de communications - un lot dination tions nvelope 83 / Acquisition de matériel et fourniture informatique, et Component 2: Strengthening matériels bureautique pour l Single Stage - One E IDA / D2860 the Policy and Institutional F Post Request for Bids Open - National 473,091.00 229,876.88 Signed 2020-06-25 2020-07-23 2020-06-30 2020-08-11 2020-09-25 2020-09-10 2020-10-26 2020-10-15 2021-04-24 2021-01-15 es CPDD, l'ANGE,Direction de nvelope ramework l'Environnement, Economie B leue et l'UGP WACA - Lot uni que 107 / Acquisition de matériel Component 2: Strengthening UN Agencies (Dire s roulants pour le Haut Conse IDA / D2860 the Policy and Institutional F Post Direct 232,727.00 0.00 Canceled 2020-06-02 2020-06-07 2020-07-12 2020-09-30 ct) il pour la Mer, l’ANGE et l’UG ramework P WACA ResIP 84BIS / Acquisition de matéri Component 2: Strengthening UN Agencies (Dire els roulants (engins TP) pour IDA / D2860 the Policy and Institutional F Post Direct 531,000.00 0.00 Canceled 2020-06-02 2020-06-07 2020-07-12 2020-11-12 ct) la Mairie d’Aného – lot uniqu ramework e 81 / Acquisition de matériels Component 2: Strengthening Request for Quota Single Stage - One E roulants pour le développem IDA / D2860 the Policy and Institutional F Post Limited 187,272.73 0.00 Canceled 2020-04-13 2020-06-08 2020-12-05 tions nvelope ent de l'économie bleue et l' ramework ANGE - 02 Lots 109 / Acquisition de trois (03 Component 4: National Coor Request for Quota Single Stage - One E ) téléphones portables pour l’ IDA / D2860 Post Limited 2,190.00 3,558.26 Signed 2020-08-16 2020-09-08 2020-10-11 2020-09-15 2020-10-27 dination tions nvelope UGP WACA ResIP 118 / Acquisition de mobilier Component 2: Strengthening Request for Quota Single Stage - One E de bureau pour l'ANGE et l'Ec IDA / D2860 the Policy and Institutional F Post Limited 36,364.00 6,936.87 Signed 2020-10-05 2021-05-18 2020-11-30 2022-02-01 2021-01-28 tions nvelope onomie Bleue ramework 120 / Acquisition de technol ogie des systèmes aériens sa Component 2: Strengthening ns pilotes (drone, logiciels, d Request for Quota Single Stage - One E IDA / D2860 the Policy and Institutional F Post Limited 70,000.00 0.00 Signed 2020-10-05 2021-06-28 2020-11-30 2021-03-01 e matériel et fourniture infor tions nvelope ramework matiques, Formations) pour l a production d'une cartograp hie 2D et 3D de gestion de la côte TG-WACA TOGO-211741-GO- Component 2: Strengthening UN / Acquisition de matériel r UN Agencies (Dire IDA / D2860 the Policy and Institutional F Post Direct 836,049.00 1,310,421.00 Signed 2020-10-15 2020-06-02 2020-10-16 2020-11-25 2020-11-22 2020-12-12 2021-02-20 oulant pour la coordination e ct) ramework t les partenaires TG-WACA TOGO-222191-GO- RFQ / Achat de véhicule Stati Component 2: Strengthening Request for Quota Single Stage - One E on WAGON pour le Ministère IDA / 62130 the Policy and Institutional F Post Limited 60,000.00 52,272.60 Signed 2021-05-25 2021-06-11 2021-07-20 2022-02-01 2021-08-19 tions nvelope de la Protection côtière, de la ramework Pêche et de l'Economie Mariti me TG-WACA TOGO-223503-GO- Component 2: Strengthening RFQ / Equipements de suivi e Request for Quota Single Stage - One E TF / A7130 the Policy and Institutional F Post Limited 18,182.00 0.00 Signed 2021-07-05 2022-04-28 2021-08-30 2021-09-29 t surveillance pour les comm tions nvelope ramework unautés locales (30 tablettes ) TG-WACA TOGO-232179-GO- RFQ / Acquisition de matériel pour la vidéoconférence pour Component 4: National Coor Request for Quota Single Stage - One E IDA / 62130 Post Limited 97,273.00 35,295.12 Signed 2021-07-20 2021-06-29 2021-09-14 2022-03-29 2021-10-14 la salle de réunion de l'UGP (l dination tions nvelope ot1) et pour la faculté de géo graphie de l'université de Kar a (lot2) TG-WACA TOGO-249718-GO- RFQ / ACQUISITION DE MOBIL Component 4: National Coor Request for Quota Single Stage - One E IDA / D2860 Post Limited 50,000.00 42,374.50 Signed 2021-10-05 2021-09-07 2021-11-30 2022-02-01 2021-12-30 IER DE BUREAU POUR L'UNIT dination tions nvelope E DE COORDINATION NATION ALE TG-WACA TOGO-223620-GO- RFQ / acquisition de matériel Component 2: Strengthening Single Stage - One E Under Imple et équipement de laboratoire IDA / D2860 the Policy and Institutional F Post Request for Bids Open - National 110,000.00 0.00 2021-11-15 2021-10-01 2021-11-20 2021-12-20 2021-11-16 2022-01-19 2021-12-29 2022-02-23 2022-05-24 nvelope mentation pour les départements de gé ramework ographie des universités de L omé et Kara TG-WACA TOGO-265102-GO- Component 4: National Coor Request for Quota Single Stage - One E Under Imple RFQ / Fourniture et installatio IDA / D2860 Post Limited 54,000.00 0.00 2022-06-01 2022-02-25 2022-07-27 2023-01-23 dination tions nvelope mentation n de groupe électrogène TG-WACA TOGO-276063-GO- Component 3: Strengthening RFB / Acquisition et installati Open - Internationa Single Stage - One E Pending Impl IDA / D2860 National Physical and Social Post Request for Bids 650,000.00 0.00 2022-09-30 2022-10-05 2022-11-16 2022-12-16 2023-01-20 2023-07-19 on d'un centre de contrôle et l nvelope ementation Investments d'une station météorologique marine TG-WACA TOGO-276061-GO- Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl RFQ / Acquisition de matériel IDA / D2860 National Physical and Social Post Limited 100,000.00 0.00 2022-06-28 2022-08-31 2023-02-27 tions nvelope ementation de collecte des données par l Investments es institutions Page 3 TG-WACA TOGO-260437-GO- RFB / FOURNITURE ET INSTAL LATION DE MINI CENTRALES SOLAIRES AVEC RESEAU ELE Component 3: Strengthening CTRIQUE, DE PLATEFORMES Single Stage - One E TF / A7130 National Physical and Social Post Request for Bids Open - National 218,000.00 0.00 Signed 2022-07-28 2022-01-31 2022-08-02 2022-09-01 2022-04-20 2022-10-01 2022-08-12 2022-11-05 2023-03-05 MULTIFONCTIONNELLES ALIM nvelope Investments ENTEES PAR LA CENTRALE S OLAIRE ET DES KITS DE LAMP ADAIRES AUTONOMES EN 04 LOTS DANS 04 LOCALITES (A damé, Afito, Godjinmé et Nya massiva) TG-WACA TOGO-223532-GO- RFQ / Acquisition d'équipeme nt pour la mise en place d'un Component 2: Strengthening e base de données de gestio Request for Quota Single Stage - One E IDA / D2860 the Policy and Institutional F Post Limited 95,454.00 0.00 Signed 2022-10-05 2022-04-26 2022-11-30 2023-02-28 n des ouvrages côtiers (serve tions nvelope ramework ur, ordinateurs portables, dis que durs externe, appareil p hoto professionnel, etc...) et des ordinateurs portables TG-WACA TOGO-292672-GO- RFQ / Acquisition d'équipeme nts complémentaires de prod Component 2: Strengthening Request for Quota Single Stage - One E Pending Impl uction des plants et d'expéri TF / A7130 the Policy and Institutional F Post Limited 54,000.00 0.00 2022-09-05 2022-10-31 2022-11-30 tions nvelope ementation mentation pour le centre se ramework mencier de Davié (Ombrière, Humidi-mètre ,PH-mètre, Mél angeur de terreau) TG-WACA TOGO-292843-GO- Component 3: Strengthening Request for Quota Single Stage - One E Under Imple RFQ / Achat d'un porte-char IDA / D2860 National Physical and Social Post Limited 70,000.00 0.00 2022-07-25 2022-06-08 2022-09-19 2023-03-18 tions nvelope mentation pour la commune Lacs1 Investments TG-WACA TOGO-306594-GO- Component 2: Strengthening Single Stage - One E Pending Impl RFB / Acquisition des équipe IDA / D2860 the Policy and Institutional F Post Request for Bids Open - National 360,000.00 0.00 2022-09-30 2022-10-05 2022-11-04 2022-12-04 2023-01-08 2023-01-20 nvelope ementation ments du studio (Météo médi ramework a) TG-WACA TOGO-313510-GO- Component 3: Strengthening RFQ / Fourniture et pose de p Request for Quota Single Stage - One E IDA / 62130 National Physical and Social Post Limited 18,000.00 0.00 Signed 2022-11-05 2022-08-24 2022-12-31 2023-06-29 anneaux de signalisation sur tions nvelope Investments les sites de travaux de prote ction côtière TG-WACA TOGO-326628-GO- RFQ / Acquisition des équipe Component 3: Strengthening ments de maraichage (Bande Request for Quota Single Stage - One E Pending Impl TF / A7130 National Physical and Social Post Limited 130,000.00 0.00 2022-12-20 2023-02-14 2023-08-13 s perforées, motopompe et a tions nvelope ementation Investments ccessoires, Pulvérisateur élec trique rechargeable etc..) TG-WACA TOGO-313451-GO- Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl RFQ / ACHAT DE TRACTEUR P IDA / D2860 National Physical and Social Post Limited 40,000.00 0.00 2023-02-20 2023-04-17 2023-10-14 tions nvelope ementation OUR LA COMMUNE LAC 1 Investments TG-WACA TOGO-308000-GO- Component 2: Strengthening Request for Quota Single Stage - One E Under Imple TF / A7130 Post Limited 150,000.00 0.00 2023-02-20 2023-02-22 2023-04-17 2023-10-14 RFQ / Acquisition d'un camio the Policy and Institutional F tions nvelope mentation n fourgon ramework TG-WACA TOGO-346896-GO- Component 3: Strengthening RFB / Acquisition des équipe Single Stage - One E Under Imple IDA / D2860 National Physical and Social Post Request for Bids Open - National 566,273.00 0.00 2023-04-24 2023-05-16 2023-04-29 2023-05-29 2023-06-28 2023-08-02 2024-02-28 ments de transformation en nvelope mentation Investments sept (07) lots pour les 7 AGR TG-WACA TOGO-355426-GO- Component 3: Strengthening RFQ / acquisition de plants p Request for Quota Single Stage - One E Pending Impl TF / A7130 National Physical and Social Post Limited 140,000.00 0.00 2023-05-20 2023-07-15 2024-01-11 our le reboisement par ODEF tions nvelope ementation Investments et les mairies des préfecture s des Lacs et Vo 97 / Réalisation des films do Component 4: National Coor Request for Quota Single Stage - One E IDA / D2860 Post Open - National 27,909.00 0.00 Canceled 2020-05-27 2020-07-22 2021-01-18 cumentaires dination tions nvelope 93 / Fournitures de bureau p Component 4: National Coor Request for Quota Single Stage - One E our l'UGP ( Accord cadre attri TF / A7130 Post Open 20,000.00 0.00 Canceled 2020-04-20 2020-06-15 2020-12-12 dination tions nvelope bution par article) TG-WACA TOGO-223544-GO- Component 2: Strengthening RFQ / Edition et vulgarisation Request for Quota Single Stage - One E IDA / D2860 the Policy and Institutional F Post Limited 5,544.00 0.00 Canceled 2021-05-31 2021-07-26 2021-08-25 du guide d'intégration de l'éc tions nvelope ramework onomie bleu dans les docum ents de planification TG-WACA TOGO-234936-GO- Component 2: Strengthening Request for Quota Single Stage - One E TF / A7130 Post Limited 5,000.00 0.00 Canceled 2021-08-04 2021-09-29 2021-11-28 RFQ / achat de deux (02) dro the Policy and Institutional F tions nvelope nes ramework TG-WACA TOGO-365276-GO- Component 3: Strengthening RFQ / Acquisition de plants p Request for Quota Single Stage - One E Pending Impl TF / A7130 National Physical and Social Post Limited 50,000.00 0.00 2023-08-05 2023-09-30 2024-03-28 our l'ODEF (Tectona grandis, tions nvelope ementation Investments Gmelina arborea, Khaya sene galensis etc..) TG-WACA TOGO-365279-GO- Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl RFQ / acquisition de plants p TF / A7130 National Physical and Social Post Limited 6,000.00 0.00 2023-08-05 2023-09-30 2024-03-28 tions nvelope ementation our la commune des Lacs 1 Investments TG-WACA TOGO-365283-GO- RFQ / achat de plants pour la Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl commune Lacs 2 (Khaya sen TF / A7130 National Physical and Social Post Limited 5,900.00 0.00 2023-08-05 2023-09-30 2024-03-28 tions nvelope ementation egalensis, Sena ciamea Gmel Investments ina arborea et autres essenc es naturelles) TG-WACA TOGO-365292-GO- Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl RFQ / Acquisition de plants p TF / A7130 National Physical and Social Post Limited 6,200.00 0.00 2023-08-13 2023-10-08 2024-04-05 tions nvelope ementation our la mairie Lacs 3 Investments TG-WACA TOGO-365294-GO- RFQ / achat de plants pour la Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl mairie Vo 1 (Khaya senegale TF / A7130 National Physical and Social Post Limited 18,000.00 0.00 2023-08-09 2023-10-04 2024-04-01 tions nvelope ementation nsis, Sena ciamea Gmelina ar Investments borea et autres essences nat urelles) TG-WACA TOGO-365296-GO- Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl RFQ / acquisition de plants p TF / A7130 National Physical and Social Post Limited 17,000.00 0.00 2023-08-13 2023-10-08 2024-04-05 tions nvelope ementation our la mairie Vo 3 Investments TG-WACA TOGO-365299-GO- Component 3: Strengthening Request for Quota Single Stage - One E Pending Impl RFQ / achat de plants pour la TF / A7130 National Physical and Social Post Limited 6,000.00 0.00 2023-08-13 2023-10-08 2024-04-05 tions nvelope ementation mairie Vo 2 Investments Page 4 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 36 / Edition du plan d'investi ssement et du document d'a Component 4: National Coor Request for Quota Single Stage - One E IDA / V1150 Post Limited 18,000.00 20,365.63 Signed 2018-02-21 2018-02-16 2018-04-18 2018-08-01 2018-10-15 nalyse du cadre juridique inst dination tions nvelope itutionnel de gestion intégrée du littoral 38 / Paramétrage du logiciel Component 4: National Coor de gestion financière du PGIC IDA / V1150 Post Direct Selection Direct 13,000.00 12,538.87 Signed 2018-07-05 2018-11-14 2018-07-10 2018-11-14 2018-08-14 2019-08-29 2019-02-10 dination T pour le projet WACA 52 / Recrutement d'un servic Component 4: National Coor Request for Quota Single Stage - One E IDA / D2860 Post Limited 4,000.00 0.00 Signed 2019-06-29 2020-06-08 2019-08-24 2020-02-20 e d'entretien dination tions nvelope 77 / Police d'assurance pour Component 4: National Coor Request for Quota Single Stage - One E le personnel recruté par le pr IDA / D2860 Post Limited 20,000.00 12,512.77 Signed 2019-11-25 2019-09-10 2020-01-20 2020-04-08 2020-07-18 dination tions nvelope ojet WACA ResIP 17 BIS / Mise en place d'un s ystème informatisé de suivi d Component 4: National Coor Single Stage - One E IDA / D2860 Post Request for Bids Open - National 40,000.00 0.00 Canceled 2019-02-20 2019-05-08 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09 u projet (acquisition, installat dination nvelope ion et formation des utilisate urs) 119 / Service de gardiennag Component 4: National Coor Request for Quota Single Stage - One E IDA / D2860 Post Limited 8,182.00 8,602.22 Signed 2020-08-17 2020-09-09 2020-10-12 2021-04-24 2021-10-09 e des bureaux de l'UGP dination tions nvelope TG-WACA TOGO-364035-NC- Component 4: National Coor Request for Quota Single Stage - One E Pending Impl RFQ / Entretien et maintenan IDA / D2860 Post Limited 24,000.00 0.00 2023-09-04 2023-10-30 2023-12-05 dination tions nvelope ementation ce de climatiseur CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 14 / Etude de faisabilité tech Component 3: Strengthening Quality And Cost- Open - Internationa nique de la protection côtière IDA / V1150 National Physical and Social Prior 2,000,000.00 0.00 Canceled 2018-02-06 2018-02-27 2018-04-12 2018-05-10 2018-06-09 2018-07-14 2018-08-18 2019-08-18 Based Selection l du segment transfrontalier B Investments énin-Togo 15 / Etude d'Impact Environ Component 2: Strengthening nemental et Social (EIES) de l Quality And Cost- Open - Internationa IDA / V1150 the Policy and Institutional F Post 320,000.00 0.00 Canceled 2018-02-08 2018-03-01 2018-04-14 2018-05-12 2018-06-11 2018-07-16 2018-08-20 2019-08-20 a protection côtière du segm Based Selection l ramework ent transfrontalier Bénin-Tog o 19 / Etude d'Impact Environ nemental et Social (EIES) pou Component 2: Strengthening Consultant Qualifi r le curage mécanique du ch IDA / V1150 the Policy and Institutional F Post Open - National 200,000.00 0.00 Canceled 2018-09-25 2018-10-16 2018-11-29 2018-12-29 2019-02-02 2019-08-01 cation Selection enal Gbaga et de restauratio ramework n de ces écosystèmes associ és 46 / Evaluation du coût de la Component 2: Strengthening dégradation historique de la Consultant Qualifi IDA / D2860 the Policy and Institutional F Post Open - National 130,000.00 149,746.25 Signed 2019-01-17 2019-05-22 2019-02-07 2019-07-08 2019-03-23 2019-11-28 2019-04-22 2020-12-22 2019-05-27 2021-04-24 2019-11-23 côte y compris la vulnérabilit cation Selection ramework é des communautés côtières 42BIS / Etude de faisabilité t echnique de l'installation d'u Component 3: Strengthening Quality And Cost- Open - Internationa ne vanne au niveau du pont IDA / D2860 National Physical and Social Prior 650,000.00 0.00 Canceled 2019-03-05 2019-03-26 2019-05-09 2019-06-06 2019-07-06 2019-08-10 2019-09-14 2020-09-13 Based Selection l de la lagune d'Aného et l'étu Investments de hydrodynamique du systè me fluvio-lagunaire 43 / Etude approfondie de fa Component 3: Strengthening Quality And Cost- Open - Internationa isabilité du traitement des bo IDA / 62130 National Physical and Social Prior 600,000.00 0.00 Canceled 2019-03-12 2019-04-02 2019-05-16 2019-06-13 2019-07-13 2019-08-17 2019-09-21 2020-09-20 Based Selection l ues de phosphates rejetées e Investments n mer 44 / Elaboration du plan spat Component 4: National Coor Quality And Cost- Open - Internationa IDA / D2860 Post 250,000.00 0.00 Canceled 2019-02-11 2019-03-04 2019-04-17 2019-05-15 2019-06-14 2019-07-19 2019-08-23 2020-08-22 ial marin et côtier dination Based Selection l 45 / Evaluation du capital na Component 2: Strengthening Quality And Cost- Open - Internationa IDA / D2860 Post 300,000.00 0.00 Canceled 2019-02-12 2019-03-05 2019-04-18 2019-05-16 2019-06-15 2019-07-20 2019-08-24 2020-08-23 turel de la zone côtière the Policy and Institutional F Based Selection l ramework 49 / Audits financiers et com Component 4: National Coor Least Cost Selecti ptables du projet - exercices IDA / D2860 Post Open - National 45,000.00 24,687.83 Signed 2019-02-11 2019-04-18 2019-03-04 2019-07-08 2019-04-17 2019-10-10 2019-05-15 2020-02-06 2019-06-14 2020-03-11 2019-07-19 2020-05-19 2019-08-23 2020-06-30 2020-02-19 dination on 2017, 2018 et 2019 3 BIS / Etudes de faisabilité t echniques de dragage et de Component 3: Strengthening stabilisation des berges de la Quality And Cost- Open - Internationa IDA / D2860 National Physical and Social Post 250,000.00 1,061,119.41 Signed 2018-10-04 2018-05-18 2018-10-25 2018-12-08 2019-08-28 2019-01-05 2019-10-10 2019-02-04 2019-10-25 2019-03-11 2019-12-13 2019-04-15 2020-08-27 2020-04-14 lagune et du lac Togo, et pou Based Selection l Investments r la Construction et le curage de caniveau, de bassin d'ora ge, de retenue d'eau 48 / Etude d'Impact Environ nemental et Social (EIES) pou Component 3: Strengthening Consultant Qualifi r le curage mécanique du ch TF / A7130 National Physical and Social Post Open - National 100,000.00 0.00 Canceled 2018-12-28 2019-01-03 2019-01-18 2019-03-03 2019-04-02 2019-05-07 2019-11-03 cation Selection enal Gbaga et de restauratio Investments n de ces écosystèmes associ és 47B / Etude de faisabilité tec Component 3: Strengthening hnique pour le curage mécan Quality And Cost- Open - Internationa TF / A7130 National Physical and Social Prior 600,000.00 554,086.35 Signed 2019-04-26 2019-04-18 2019-05-17 2019-07-23 2019-06-30 2020-10-17 2019-07-28 2020-10-26 2019-08-27 2021-01-14 2019-10-01 2021-04-13 2019-11-05 2021-06-19 2020-11-04 ique du chenal de Gbaga et d Based Selection l Investments e la restauration de ces écos ystèmes associés 47 / Etude de faisabilité tech Component 3: Strengthening nique du curage mécanique Quality And Cost- Open - Internationa TF / A7130 National Physical and Social Post 300,000.00 0.00 Canceled 2018-12-28 2019-01-03 2019-01-18 2019-03-03 2019-03-31 2019-04-30 2019-06-04 2019-07-09 2020-07-08 du chenal Gbaga et de resta Based Selection l Investments uration de ces écosystèmes associés 48B / Etude d'Impact Enviro nnemental et Social (EIES) po Component 3: Strengthening Consultant Qualifi Open - Internationa Under Implement ur le curage mécanique du c TF / A7130 National Physical and Social Post 200,000.00 0.00 2019-04-26 2019-04-17 2019-05-17 2019-06-30 2019-08-13 2019-07-30 2021-02-26 2019-09-03 2020-03-01 cation Selection l ation henal Gbaga et de restaurati Investments on de ces écosystèmes assoc iés Page 5 40 / Surveillance et contrôle Component 4: National Coor Consultant Qualifi des travaux d'aménagement IDA / V1150 Post Open - National 18,000.00 0.00 Canceled 2018-07-11 2018-08-01 2018-09-14 2018-10-14 2018-11-18 2019-05-17 dination cation Selection des bureaux du Projet WACA 62 / Élaboration du plan d'a Component 3: Strengthening ménagement participatif et d Consultant Qualifi Open - Internationa TF / A7130 National Physical and Social Post 140,000.00 154,345.80 Signed 2019-08-28 2020-01-07 2019-09-18 2020-06-26 2019-11-01 2020-10-26 2019-12-01 2021-02-09 2020-01-05 2021-04-24 2020-07-03 es outils de gestion de la forê cation Selection l Investments t communautaire d'Avévé  63 / Elaboration du plan d'a Component 3: Strengthening ménagement participatif et d Consultant Qualifi Open - Internationa TF / A7130 National Physical and Social Post 150,000.00 154,345.80 Signed 2019-08-28 2020-01-07 2019-09-18 2020-06-26 2019-11-01 2020-10-15 2019-12-01 2021-02-09 2020-01-05 2021-04-24 2020-07-03 es outils de gestion de la forê cation Selection l Investments t communautaire de Kodjo-G ati 60 / Recrutement d'une stru cture ( centre de formation) Component 3: Strengthening pour la formation et l'accomp Consultant Qualifi TF / A7130 National Physical and Social Post Open - National 55,000.00 244,722.82 Signed 2019-08-28 2019-08-21 2019-09-18 2019-11-01 2020-05-05 2019-12-01 2020-06-10 2020-01-05 2021-06-04 2020-07-03 agnement des acteurs comm cation Selection Investments unautaires sur les bonnes pr atiques en gestion durable d es terres. 82 / Etude sur la situation de s plantes envahissantes, des Component 3: Strengthening Consultant Qualifi Open - Internationa modèles de gestion et de val TF / A7130 National Physical and Social Post 80,000.00 0.00 Signed 2019-12-30 2020-03-30 2020-01-20 2022-04-28 2020-03-04 2022-10-20 2020-04-03 2022-11-28 2020-05-08 2020-11-04 cation Selection l orisation dans la sous-région Investments et les applications possibles dans la zone du projet 40 C / Surveillance et contrôl e des travaux d'aménageme nt du R + 1 des bureaux de l' Component 4: National Coor Consultant Qualifi UGP, Construction du mur de IDA / D2860 Post Open - National 20,000.00 0.00 Canceled 2019-08-28 2019-09-18 2019-11-01 2019-12-01 2020-01-05 2020-07-03 dination cation Selection séparation, d'un parking pour 10 voitures, d'un poste d'ach at et d'un aménagement de cour. 105 / Recrutement d'un cabi net pour l'actualisation de l'é tude de faisabilité technique Component 3: Strengthening du projet d'assainissement d Quality And Cost- Open - Internationa IDA / D2860 National Physical and Social Post 120,000.00 111,390.00 Signed 2020-06-30 2020-09-16 2020-07-21 2021-01-20 2020-09-03 2021-04-15 2020-10-01 2021-07-02 2020-10-31 2021-07-28 2020-12-05 2021-08-19 2021-01-09 2022-02-01 2022-01-09 es eaux usées à la plage de L Based Selection l Investments omé, réhabilitation du réseau embryonnaire d'assainissem ent collectif des eaux usées de la ville de Lomé au Togo 121 / Recrutement d'un cabi net pour le contrôle et surveil Component 3: Strengthening lance des travaux d’urgence Consultant Qualifi IDA / D2860 National Physical and Social Post Limited 910.00 90,871.35 Signed 2020-08-07 2020-08-09 2020-08-21 2020-08-25 2020-09-20 2020-11-10 2020-10-25 2021-02-02 2021-02-24 de protection contre l’érosion cation Selection Investments côtière des habitations vulné rables sur le littoral togolais allant de Gbodjomé à Agbodr afo. TG-WACA TOGO-223531-CS- CQS / Etude de faisabilité te Component 2: Strengthening Consultant Qualifi chnique pour la création et l' IDA / D2860 the Policy and Institutional F Post Open - National 92,000.00 0.00 Canceled 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 cation Selection opérationnalisation de l'obse ramework rvatoire national sur le littora l 78 / Assistance technique et Component 2: Strengthening Consultant Qualifi TF / A7130 Post Open - National 220,982.00 0.00 Canceled 2020-01-14 2020-01-15 2020-02-04 2020-03-19 2020-04-18 2020-05-23 2020-11-19 contrôle des activités commu the Policy and Institutional F cation Selection nautaires ramework 113 / Etude d'avant projet d étaillé (APD) pour la construc Component 4: National Coor Consultant Qualifi tion de la nouvelle direction r IDA / D2860 Post Open - National 40,000.00 0.00 Canceled 2020-07-27 2020-08-17 2020-09-30 2020-10-30 2020-12-04 2021-06-02 dination cation Selection égionale des forestiers de la réserve de faune de Togodo Nord à Atakpamé TG-WACA TOGO-276324-CS- Component 4: National Coor Least Cost Selecti Pending Impleme LCS / audit externe 2023 et IDA / D2860 Post Open - National 20,000.00 0.00 2022-08-16 2022-09-06 2022-10-20 2022-11-17 2022-12-17 2023-01-21 2023-02-25 2023-03-27 dination on ntation clôture du projet TG-WACA TOGO-276160-CS- Component 3: Strengthening QBS / Informatisation du syst Consultant Qualifi Open - Internationa Pending Impleme TF / A7130 National Physical and Social Post 100,000.00 0.00 2022-09-30 2022-10-21 2022-12-04 2023-01-03 2023-02-07 2023-08-06 ème de suivi-évaluation du M cation Selection l ntation Investments ERF: Extension du logiciel Ru che au ministère TG-WACA TOGO-276156-CS- Component 2: Strengthening QBS / Recrutement d'un cabi Consultant Qualifi Open - Internationa TF / A7130 the Policy and Institutional F Post 100,000.00 0.00 Signed 2022-07-29 2022-05-11 2022-08-19 2022-07-27 2022-10-02 2022-09-15 2022-11-01 2022-11-02 2022-12-06 2023-06-04 net pour la formation des ag cation Selection l ramework ents du MEMPPC sur la prote ction côtière TG-WACA TOGO-224375-CS- Component 3: Strengthening CDS / Etude de faisabilité tec Quality And Cost- Open - Internationa Under Implement IDA / 62130 National Physical and Social Post 380,000.00 0.00 2022-09-28 2023-03-14 2022-10-19 2022-12-02 2022-06-06 2022-12-30 2022-06-17 2023-01-29 2022-06-02 2023-03-05 2022-06-20 2023-04-09 2024-04-08 hnique de la mise en place d' Based Selection l ation Investments un bypass au port autonome de Lomé TG-WACA TOGO-276177-CS- Component 3: Strengthening QBS / Mise en valeur de quat Quality And Cost- Open - Internationa Under Implement IDA / 62130 National Physical and Social Post 363,637.00 0.00 2022-09-30 2023-05-01 2022-10-21 2023-05-04 2022-12-04 2023-01-01 2023-01-31 2023-03-07 2023-04-11 2024-04-10 re zones prioritaires du Sché Based Selection l ation Investments ma d’aménagement du Littor al (SDAL) TG-WACA TOGO-222420-CS- CQS / Elaboration de la carte Component 2: Strengthening Consultant Qualifi de vulnérabilité de la côte to TF / A7130 the Policy and Institutional F Post Open - National 54,545.00 0.00 Canceled 2022-08-24 2022-09-14 2022-10-28 2022-11-27 2023-01-01 2023-04-01 cation Selection golaise face aux menaces de ramework pollution par les hydrocarbur es (ABC) TG-WACA TOGO-308002-CS- CQS / Elaboration de la carte Component 2: Strengthening Consultant Qualifi Open - Internationa Under Implement de vulnérabilité de la côte to TF / A7130 the Policy and Institutional F Post 100,000.00 0.00 2022-10-20 2023-01-24 2022-11-10 2023-03-24 2022-12-24 2023-01-23 2023-02-27 2023-08-26 cation Selection l ation golaise face aux menaces de ramework pollution par les hydrocarbur es (ABC) TG-WACA TOGO-313433-CS- Component 3: Strengthening CQS / CONTRÔLE DES TRAVA Consultant Qualifi Open - Internationa Under Implement IDA / 62130 National Physical and Social Post 990,000.00 0.00 2022-10-20 2022-09-29 2022-11-10 2022-12-13 2022-12-24 2023-01-23 2023-02-27 2023-12-24 UX DE CURAGE MÉCANIQUE cation Selection l ation Investments DU CHENAL DE GBAGA TG-WACA TOGO-339841-CS- Component 2: Strengthening Quality And Cost- CQS / Étude architecturale de IDA / D2860 the Policy and Institutional F Post Open - National 120,000.00 0.00 Under Review 2023-04-24 2023-05-15 2023-06-28 2023-07-26 2023-08-25 2023-09-29 2023-11-03 2024-11-02 Based Selection la construction du siège de l' ramework ANGE Page 6 TG-WACA TOGO-276163-CS- QBS / Appui à la mise en œu Component 3: Strengthening vre du plan d'investissement Consultant Qualifi Open - Internationa IDA / D2860 National Physical and Social Post 100,000.00 0.00 Canceled 2022-09-30 2022-10-21 2022-12-04 2023-01-03 2023-02-07 2023-08-06 des CDN 2030 du Togo pour l cation Selection l Investments 'élaboration d'une stratégie d e développement sobre en c arbone et résilience au CC TG-WACA TOGO-223546-CS- Component 2: Strengthening Consultant Qualifi CQS / Elaboration du plan sp IDA / D2860 the Policy and Institutional F Post Open - National 32,000.00 0.00 Canceled 2022-09-26 2022-10-17 2022-11-30 2022-12-30 2023-02-03 2023-06-03 cation Selection atial marin et côtier ramework INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1 / Elaboration du Cadre de Component 2: Strengthening Individual Consult Gestion Environnementale et IDA / V1150 the Policy and Institutional F Post Limited 27,500.00 23,893.15 Signed 2017-07-18 2017-06-22 2017-07-23 2017-09-07 2018-01-29 2017-09-28 2018-03-05 2017-11-29 2018-07-17 ant Selection Sociale (CGES) ramework 2 / Elaboration du Cadre de Component 2: Strengthening Individual Consult IDA / V1150 Post Limited 24,000.00 20,223.92 Signed 2017-06-22 2017-06-22 2017-08-24 2017-09-07 2017-09-29 2017-09-29 2017-11-29 2017-11-29 2018-01-12 Politique de Réinstallation (C the Policy and Institutional F ant Selection PR) ramework 4 / Etude d'impact environne Component 2: Strengthening mental et social des dragage Individual Consult IDA / V1150 the Policy and Institutional F Post Limited 18,000.00 0.00 Signed 2017-11-12 2017-11-12 2018-01-27 2018-01-22 2018-02-17 2018-05-31 2018-03-24 2018-04-24 s et de la construction des ou ant Selection ramework vrages de lutte contre les ino ndations 13 / Elaboration de la straté Component 4: National Coor IDA / V1150 Post Direct Selection Direct 14,000.00 13,130.33 Signed 2017-12-12 2017-12-12 2017-12-22 2017-12-22 2018-02-09 2018-08-29 2018-03-29 gie de passation des marché dination s (PPSD) 6 / Recrutement d'un spécial Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Canceled 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 iste en passation des marché dination ant Selection s 8 / Recrutement d'un spécial Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Canceled 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 iste en suivi-évaluation dination ant Selection 9 / Recrutement d'un spécial Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Canceled 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 iste en sauvegarde sociale dination ant Selection 10 / Recrutement d'un spéci Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Canceled 2018-02-20 2018-04-10 2018-05-01 2018-06-05 2018-12-02 aliste en communication dination ant Selection 9 BIS / Recrutement d'un sp Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Signed 2018-04-26 2018-05-18 2018-06-14 2019-01-25 2018-07-05 2019-05-14 2018-08-09 2019-02-05 écialiste en sauvegarde socia dination ant Selection le 10 BIS / Recrutement d'un s Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Signed 2018-06-03 2018-02-18 2018-07-22 2019-04-11 2018-08-12 2019-05-20 2018-09-16 2019-03-15 pécialiste en communication dination ant Selection 7 / Recrutement d'un ingéni Component 4: National Coor Individual Consult IDA / V1150 Post Open 28,000.00 0.00 Signed 2018-05-17 2018-08-13 2018-07-05 2018-07-26 2019-04-15 2018-08-30 2019-02-26 eur génie civil (génie côtier) dination ant Selection 27 / Recrutement d'un audit Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Signed 2018-05-24 2019-02-03 2018-07-12 2019-06-25 2018-08-02 2022-02-22 2018-09-06 2019-03-05 eur interne du projet dination ant Selection 11 / Recrutement de secréta Component 4: National Coor Individual Consult IDA / V1150 Post Open 12,000.00 0.00 Canceled 2018-02-20 2018-04-10 2018-05-01 2018-06-05 2018-12-02 ire caissière dination ant Selection 7 / Recrutement d'un ingéni Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Canceled 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 eur génie civil (génie côtier) dination ant Selection 3 / Réalisation d'études tech Component 3: Strengthening Individual Consult niques d'ouvrages de lutte co IDA / V1150 National Physical and Social Post Limited 53,000.00 0.00 Canceled 2017-11-08 2017-11-13 2018-03-26 2018-04-30 2018-10-27 ant Selection ntre les inondations Investments 12 / Recrutement d'un Assist Component 4: National Coor Individual Consult IDA / V1150 Post Limited 30,000.00 0.00 Canceled 2017-11-08 2017-11-13 2017-12-04 2018-01-08 2018-07-07 ant technique au projet dination ant Selection 25 / Recrutement d'un assist Component 4: National Coor Individual Consult IDA / V1150 Post Open 10,000.00 0.00 Canceled 2018-04-26 2018-06-14 2018-07-05 2018-08-09 2019-02-05 ant en passation des marché dination ant Selection s 24 BIS / Recrutement d'un s Component 4: National Coor Individual Consult IDA / D2860 Post Open 24,000.00 0.00 Signed 2018-08-29 2018-09-18 2018-11-02 2018-11-23 2019-02-25 2018-12-28 2019-06-26 pécialiste en gestion financiè dination ant Selection re 24 / Recrutement d'un assist Component 4: National Coor Individual Consult IDA / V1150 Post Open 10,000.00 0.00 Canceled 2018-08-29 2018-10-31 2018-11-21 2018-12-26 2019-06-24 ant au spécialiste en gestion dination ant Selection financière 6 BIS / Recrutement d'un sp Component 4: National Coor Individual Consult IDA / D2860 Post Open 24,000.00 37,051.31 Signed 2018-08-27 2018-10-31 2019-02-15 2018-11-21 2019-08-19 2018-12-26 2019-08-09 2019-06-24 écialiste en passation des ma dination ant Selection rchés 69 / Actualisation des manu Component 2: Strengthening Individual Consult IDA / D2860 Post Open 13,000.00 13,023.07 Signed 2019-06-17 2019-06-07 2019-08-05 2020-11-17 2019-08-26 2020-11-23 2019-09-30 2021-04-24 2020-03-28 els de procédure de l'ANGE the Policy and Institutional F ant Selection ramework 67 / Élaboration du plan de d éveloppement des Ressource Component 2: Strengthening Individual Consult s Humaines du Ministère de l' TF / A7130 the Policy and Institutional F Post Open 15,000.00 0.00 Canceled 2019-06-19 2019-06-17 2019-08-07 2019-08-28 2019-10-02 2020-03-30 ant Selection Environnement, du Développ ramework ement Durable et de la Prote ction de la Nature 64 / Appui à l'analyse institu tionnelle du Ministère de l'En vironnement, du Développe Component 2: Strengthening Individual Consult ment Durable et de la Protec TF / A7130 the Policy and Institutional F Post Open 15,000.00 16,668.25 Signed 2019-06-19 2019-06-07 2019-08-07 2020-11-17 2019-08-28 2020-11-23 2019-10-02 2021-04-24 2020-03-30 ant Selection tion de la Nature relative à la ramework mise en œuvre des conventio ns internationales signées pa r le Togo Component 3: Strengthening 68 / Élaboration du cadre fo Individual Consult TF / A7130 National Physical and Social Post Open 24,000.00 18,403.19 Signed 2019-06-17 2019-06-07 2019-08-05 2019-11-04 2019-08-26 2019-02-07 2019-09-30 2020-08-18 2020-03-28 nctionnel (procédural) ant Selection Investments Page 7 40B / Surveillance contrôle d es Travaux d'aménagement du R+1 des bureaux pour l'U GP, Construction du mur de s Component 4: National Coor Individual Consult IDA / V1150 Post Open 9,000.00 0.00 Canceled 2019-06-20 2019-08-08 2019-08-29 2019-10-03 2020-03-31 éparation, d'un parking pour dination ant Selection 10 voitures, un poste d'héber gement (des compteurs et d u groupe électrogène) et am énagement de la cour 61 / Élaboration des textes d Component 2: Strengthening Individual Consult IDA / D2860 Post Open 20,000.00 22,801.19 Signed 2019-06-20 2019-06-07 2019-08-08 2020-12-18 2019-08-29 2021-01-04 2019-10-03 2021-04-24 2020-03-31 'application de la loi sur le litt the Policy and Institutional F ant Selection oral ramework 53 / Recrutement d'un (01) c Component 4: National Coor Individual Consult IDA / D2860 Post Open 3,500.00 4,603.46 Signed 2019-06-26 2019-08-21 2019-08-14 2020-05-13 2019-09-04 2020-09-03 2019-10-09 2020-09-22 2020-04-06 oursier dination ant Selection 55 / Recrutement de deux (2 Component 4: National Coor Individual Consult IDA / D2860 Post Open 9,000.00 20,845.12 Signed 2019-07-12 2019-08-21 2019-08-30 2020-06-02 2019-09-20 2020-07-15 2019-10-25 2020-09-22 2020-04-22 ) chauffeurs de permis catég dination ant Selection orie B 54 / Recrutement d'un (01) c Component 4: National Coor Individual Consult IDA / D2860 Post Open 5,500.00 0.00 Canceled 2019-08-22 2019-08-21 2019-10-10 2019-10-31 2019-12-05 2020-06-02 hauffeur de permis catégorie dination ant Selection C 75 / Recrutement d'un Coord Component 4: National Coor Individual Consult IDA / D2860 Post Open 33,000.00 40,385.61 Signed 2019-08-19 2019-08-20 2019-10-07 2020-03-04 2019-10-28 2020-03-11 2019-12-02 2020-05-27 2020-05-30 onnateur du projet WACA Re dination ant Selection sIP 75BIS / Recrutement de coor Component 4: National Coor Individual Consult IDA / D2860 Post Open 33,000.00 40,486.37 Signed 2019-11-20 2019-11-08 2019-12-23 2020-03-13 2020-01-06 2020-03-25 2020-02-10 2020-05-27 2020-08-08 donnateur pour le projet WA dination ant Selection CA ResIP 91 / Recrutement d'un secré Component 4: National Coor Individual Consult taire administratif pour l'UGP IDA / D2860 Post Open 12,000.00 694.31 Signed 2020-04-09 2020-07-30 2020-05-28 2021-03-15 2020-06-18 2021-05-10 2020-07-23 2021-06-16 2021-01-19 dination ant Selection WACAResIP 89 / Recrutement de consult ant individuel environnement Component 2: Strengthening aliste pour le contrôles des tr Individual Consult TF / A7130 the Policy and Institutional F Post Open 11,136.00 0.00 Canceled 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 avaux d'aménagement de la ant Selection ramework cour du MEDDPN et des bure aux de l'UGP (RDC et R+1) 20 / Recrutement d'un spéci Component 4: National Coor Individual Consult IDA / V1150 Post Open 24,000.00 0.00 Canceled 2018-06-03 2018-07-22 2019-06-25 2018-08-12 2018-09-16 2019-03-15 aliste en développement insti dination ant Selection tutionnel 111 / Recrutement d'un exp Component 4: National Coor Individual Consult ert en passation de marché p IDA / D2860 Post Open 28,500.00 34,987.56 Signed 2020-05-29 2020-05-25 2020-07-17 2020-07-23 2020-08-07 2020-10-02 2020-09-11 2020-11-21 2021-09-10 dination ant Selection our le projet WACA ResIP 115 / Recrutement d'un audi Component 4: National Coor Individual Consult IDA / D2860 Post Open 17,455.00 0.00 Canceled 2020-06-03 2020-07-22 2020-08-12 2020-09-16 2021-11-30 teur interne pour le projet W dination ant Selection ACA ResIP 101 / Recrutement de consul tant individuel génie électro Component 2: Strengthening mécanique pour le contrôle d Individual Consult IDA / D2860 the Policy and Institutional F Post Open 6,200.00 15,039.77 Signed 2020-07-10 2020-06-16 2020-08-28 2020-09-23 2020-09-18 2021-03-24 2020-10-23 2021-04-24 2021-06-23 es travaux d'aménagement d ant Selection ramework u cadre de travail de l'ANGE et du bâtiment R+1 de l'UGP WACA ResiP 90 / Recrutement d’un secré taire pour la passation de ma Component 4: National Coor Individual Consult IDA / D2860 Post Open 12,000.00 11,146.14 Signed 2020-06-30 2020-08-11 2020-08-18 2021-03-15 2020-09-08 2021-05-10 2020-10-13 2021-06-16 2021-04-11 rché et la gestion financière dination ant Selection du projet WACA ResIP 117 / Recrutement d'un spéc Component 4: National Coor Individual Consult ialiste en communication pou IDA / D2860 Post Open 24,000.00 0.00 Canceled 2020-08-12 2020-09-30 2020-10-21 2020-11-25 2021-11-24 dination ant Selection r le projet WACA ResIP 122 / Mise en place d'un sys Component 2: Strengthening tème automatisé de gestion Individual Consult TF / A7130 the Policy and Institutional F Post Open 15,000.00 30,789.27 Signed 2020-09-30 2021-03-29 2020-11-18 2021-06-28 2020-12-09 2021-08-19 2021-01-13 2021-10-15 2021-04-12 des ressources humaines et f ant Selection ramework inancières du MEDDPN TG-WACA TOGO-204714-CS- Component 3: Strengthening INDV / élaboration d'un plan Individual Consult TF / A7130 National Physical and Social Post Limited 20,000.00 25,170.94 Signed 2021-01-28 2020-12-30 2021-02-12 2021-02-04 2021-03-05 2021-06-17 2021-04-09 2021-08-04 2021-05-09 d'aménagement et de gestio ant Selection Investments n de la forêt classée d'Assév é 99 / Recrutement d'un consu ltant pour la réalisation d'un Component 3: Strengthening Individual Consult plan d'action de réinstallatio IDA / D2860 National Physical and Social Post Open 22,000.00 0.00 Canceled 2020-04-10 2020-05-29 2020-06-19 2020-07-24 2021-01-20 ant Selection n du dragage et stabilisation Investments des berges de la lagune et d u lac Togo 95 / Recrutement d'un consu Component 3: Strengthening ltant pour la realisation d'un Individual Consult TF / A7130 National Physical and Social Post Open 9,091.00 0.00 Canceled 2020-04-09 2020-04-14 2020-05-28 2020-06-18 2020-07-23 2021-01-19 plan d'action de réinstallatio ant Selection Investments n du complexe d'aires protég ées de TOGODO 102 / Recrutement de consul tant individuel environnemen Component 2: Strengthening Individual Consult taliste pour le contrôle des tr IDA / D2860 the Policy and Institutional F Post Open 2,727.00 0.00 Canceled 2020-04-09 2020-05-28 2020-06-18 2020-07-23 2021-01-19 ant Selection avaux d'aménagement du ca ramework dre de travail de l'ANGE 94 / Recrutement de consult ant individuel génie civil pour Component 2: Strengthening Individual Consult le contrôle des travaux IDA / D2860 the Policy and Institutional F Post Open 4,136.00 0.00 Canceled 2020-06-30 2020-08-18 2020-09-08 2020-10-13 2021-05-12 ant Selection d'aménagement du cadre de ramework travail de l'ANGE 86 / Recrutement de consult ant individuel génie civil pour Component 2: Strengthening Individual Consult le contrôles des travaux d'a TF / A7130 the Policy and Institutional F Post Open 18,182.00 0.00 Canceled 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 ant Selection ménagement de la cour du ramework MEDDPN et des bureaux de l' UGP (RDC et R+1) 80 / Etude d'impact environn Component 3: Strengthening Individual Consult ementale et sociale du compl TF / A7130 National Physical and Social Post Open 18,182.00 0.00 Canceled 2020-03-19 2020-03-30 2020-05-07 2020-05-28 2020-07-02 2020-12-29 ant Selection exe d'aires protégées de TO Investments GODO TG-WACA TOGO-222909-CS- Component 4: National Coor Individual Consult INDV / Elaboration du rapport IDA / D2860 Post Open 46,000.00 35,376.04 Signed 2021-04-15 2021-03-29 2021-06-03 2021-08-04 2021-06-24 2021-08-16 2021-07-29 2021-09-30 2021-08-28 dination ant Selection d'évaluation à mi-parcours Page 8 TG-WACA TOGO-222896-CS- Component 4: National Coor Individual Consult INDV / SELECTION D’UN EXPE IDA / D2860 Post Open 38,000.00 123.63 Signed 2021-06-18 2021-06-01 2021-08-06 2021-09-03 2021-08-27 2021-09-03 2021-10-01 2022-03-29 2022-10-01 dination ant Selection RT OCEANOGRAPHE – LITTOR ALISTE TG-WACA TOGO-222891-CS- Component 2: Strengthening Individual Consult INDV / Elaboration du plan sp IDA / D2860 the Policy and Institutional F Post Open 32,000.00 0.00 Canceled 2021-05-20 2021-07-08 2021-07-29 2021-09-02 2021-10-02 ant Selection atial marin et côtier ramework 51 / Appui à la mise en place Component 2: Strengthening Individual Consult IDA / D2860 Post Open 30,000.00 0.00 Canceled 2019-02-04 2019-06-05 2019-03-25 2019-04-15 2019-05-20 2019-11-16 du MRV de la zone côtière the Policy and Institutional F ant Selection ramework TG-WACA TOGO-238696-CS- INDV / Recrutement d'un spé Component 4: National Coor Individual Consult IDA / D2860 Post Open 27,000.00 0.00 Under Review 2021-07-14 2021-06-07 2021-09-01 2021-09-22 2021-10-27 2022-10-22 cialiste en développement de dination ant Selection s sous-projet communautaire et AGR pilote TG-WACA TOGO-240809-CS- INDV / RECRUTEMENT D’UN Component 4: National Coor Individual Consult IDA / D2860 Post Limited 17,455.00 16,663.49 Signed 2021-07-30 2021-06-02 2021-08-04 2021-06-10 2021-08-25 2021-08-12 2021-09-29 2021-10-09 2021-11-04 ASSISTANT A LA MISE EN ŒU dination ant Selection VRE DES ACTIVITES GENERA TRICES DE REVENUS TG-WACA TOGO-240217-CS- INDV / ELABORATION DU PLA Component 3: Strengthening N D’ACTION POUR LA RESTRI Individual Consult TF / A7130 National Physical and Social Post Open 54,545.00 40,571.91 Signed 2021-09-30 2021-08-06 2021-11-18 2022-03-15 2021-12-09 2022-04-22 2022-01-13 2022-06-16 2022-04-13 CTION D’ACCES AUX RESSOU ant Selection Investments RCES DES ECOSYSTEMES FO RESTIERS DE LA ZONE LITTO RALE DU TOGO 87 / Recrutement de consult ant individuel génie electro- Component 2: Strengthening mécanique pour le contrôles Individual Consult TF / A7130 the Policy and Institutional F Post Open 18,182.00 0.00 Canceled 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 des travaux d'aménagement ant Selection ramework de la cour du MEDDPN et de s bureaux de l'UGP (RDC et R +1) TG-WACA TOGO-260449-CS- INDV / recrutement d'un cons Component 3: Strengthening ultant individuel pour l'appui Individual Consult TF / A7130 National Physical and Social Post Open 35,000.00 0.00 Under Review 2022-08-23 2022-03-17 2022-10-11 2022-11-01 2022-12-06 2023-06-04 à l’aménagement des périmè ant Selection Investments tres maraichers de 04 sous p rojets communautaires TG-WACA TOGO-260444-CS- INDV / IDENTIFICATION, ELAB ORATION DES SPECIFICATION Component 3: Strengthening Individual Consult Pending Impleme S TECHNIQUES ET DETERMIN TF / A7130 National Physical and Social Post Open 27,000.00 0.00 2022-07-26 2022-08-31 2022-09-21 2022-10-26 2022-11-25 ant Selection ntation ATION DES COÛTS DES EQUI Investments PEMENTS POUR LE DEVELOP PEMENT DES FILIERES AGRIC OLES TG-WACA TOGO-222416-CS- Component 2: Strengthening Individual Consult Under Implement INDV / Etude pour la mise en IDA / D2860 the Policy and Institutional F Post Open 30,000.00 0.00 2022-08-24 2022-01-26 2022-10-13 2022-11-03 2022-12-08 2023-01-07 ant Selection ation place du MRV de la zone côti ramework ère TG-WACA TOGO-299627-CS- Component 2: Strengthening Individual Consult INDV / RÉALISATION D’UNE IDA / D2860 the Policy and Institutional F Post Open 45,000.00 0.00 Signed 2022-07-27 2022-06-06 2022-09-14 2022-10-12 2022-10-05 2022-12-23 2022-11-09 2023-05-08 ant Selection WEB CARTOGRAPHIE DU PRO ramework JET WACA ResIP TG-WACA TOGO-306645-CS- Component 3: Strengthening CDS / Actualisation de l'étud Direct - Internation IDA / 62130 National Physical and Social Post Direct Selection 110,000.00 0.00 Signed 2022-09-30 2022-09-13 2022-10-10 2022-09-14 2022-12-05 2023-02-03 e de faisabilité technique de l al Investments a protection côtière: tronçon Agbodrafo-Gbodjomé TG-WACA TOGO-306628-CS- CDS / Actualisation de l'étud Component 3: Strengthening Direct - Internation e d'impact environnemental IDA / 62130 National Physical and Social Post Direct Selection 120,000.00 0.00 Signed 2022-09-30 2022-09-28 2022-10-10 2022-09-12 2022-12-05 2023-03-05 al et social du tronçon Agbodraf Investments o-Gbodjomé et élaboration d u PAR TG-WACA TOGO-332877-CS- INDV / ELABORATION DE L’A DDENDUM AU PLAN D’ACTIO Component 3: Strengthening NS DE RÉINSTALLATION (PAR Individual Consult Pending Impleme IDA / 62130 National Physical and Social Post Limited 30,000.00 0.00 2023-01-24 2023-01-29 2023-02-19 2023-03-26 2023-09-22 ) DES PERSONNES AFFECTÉE ant Selection ntation Investments S DANS LE CADRE DES TRAV AUX DE PROTECTION DU SEG MENT DE CÔTE SITUE ENTRE AGBODRAFO ET ANEHO TG-WACA TOGO-223541-CS- INDV / Actualisation du plan Component 2: Strengthening Individual Consult d’action pour le développem IDA / D2860 the Policy and Institutional F Post Open - National 27,273.00 0.00 Signed 2021-05-28 2022-05-09 2021-07-16 2022-12-23 2021-08-06 2022-12-23 2021-09-10 2021-10-10 ant Selection ent et l’adaptation aux chang ramework ements climatiques du littora l togolais TG-WACA TOGO-346060-CS- Component 2: Strengthening INDV / REALISATION DE L'ET Individual Consult Under Implement TF / A7130 the Policy and Institutional F Post Open - National 13,000.00 0.00 2023-05-30 2023-05-02 2023-07-18 2023-08-08 2023-09-12 2024-03-10 UDE DE SATISFACTION DES B ant Selection ation ramework ENEFICAIRES DU PROJET WA CA ResIP TG-WACA TOGO-355432-CS- Component 3: Strengthening INDV / élaboration d'une stra Individual Consult Under Implement IDA / D2860 National Physical and Social Post Open - National 60,000.00 0.00 2023-05-15 2022-10-10 2023-07-03 2023-07-24 2023-08-28 2024-02-24 tégie de développement sobr ant Selection ation Investments e en carbone et résilience au CC TG-WACA TOGO-356038-CS- Component 3: Strengthening INDV / Réalisation de l'EIES si Individual Consult Pending Impleme IDA / 62130 National Physical and Social Post Limited 30,000.00 0.00 2023-05-30 2023-06-04 2023-06-25 2023-07-30 2024-01-26 mplifié des activités du sous ant Selection ntation Investments projet d'AGR pilote noix de C oco 50 / Etude pour la mise en pl ace du système national d'inf Component 2: Strengthening ormations côtières (Définitio Individual Consult IDA / D2860 the Policy and Institutional F Post Open 70,000.00 0.00 Canceled 2019-04-02 2019-06-05 2019-05-21 2019-06-11 2019-07-16 2020-01-12 n et harmonisation des stand ant Selection ramework ards de collecte, traitement e t diffusion de données pour l' observatoire) 106 / Recrutement d'un cons ultant pour la réalisation de l' EIES du projet d'assainissem Component 3: Strengthening Individual Consult ent des eaux usées à la plag IDA / D2860 National Physical and Social Post Open 50,000.00 0.00 Canceled 2020-06-02 2020-11-11 2020-07-21 2020-08-11 2020-09-15 2021-01-15 ant Selection e de Lomé, réhabilitation du r Investments éseau embryonnaire d'assain issement collectif des eaux u sées de la ville de Lomé-Tog o Page 9 TG-WACA TOGO-276167-CS- Component 2: Strengthening INDV / Appui à la révision de Individual Consult IDA / D2860 the Policy and Institutional F Post Open 20,000.00 0.00 Canceled 2022-07-15 2022-09-02 2022-09-23 2022-10-28 2023-04-26 la loi cadre sur l'environnem ant Selection ramework ent et l'élaboration de ses te xtes d'application Page 10 Sample Procurement Plan Regional Disease Surveillance Systems Enhancement (REDISSE)(P154807) I. General 1. Bank’s approval Date of the procurement Plan [Original: July 2016]: Revision 1of Updated Procurement Plan, January 5th 2017 2. Date of General Procurement Notice: Dec 27, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year March to December 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Prior Review Type of procurement Threshold US$ Works (including turnkey, supply & US$ 10 million installation of plant and equipment, and PPP) Goods, information technology and non- US$ 2 million consulting services 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: not applicable 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued by WAHO 5. Any Other Special Procurement Arrangements: Not applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 4/4/2017 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 0.14 1 No Post of the NCB (Goods) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Type of procurement Prior Review Threshold US$ Consultants: firms US$ 1 million Consultants: individuals US$ 0.3 million 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comments of ed s by Bank Assignmen Cost (Prior / t US$ Post) million Summary 3.995 2 Prior of number of contracts that will be let under QCB Summary 0.22 2 Post Market of number approach: of Open 4/4/2017 contracts Internatio that will nal be let under CQS 4/4/2017 PROCUREMENT Western and Central Africa : Regional Disease Surveillance Systems Enhancement (REDISSE) PLAN General Information Country: Western and Central Africa 2017-04-04 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154807 GPN Date: Project Name: Regional Disease Surveillance Systems Enhancement (REDISSE) Loan / Credit No: IDA / D1310, TF / A2534, TF / B1239 West African Health Organization Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-WAHO-10499-GO-RFQ / A Component 5: Institutional C Request for Quota Single Stage - One E cquisition de mobilier pour b IDA / D1310 apacity Building, Project Ma Post Limited 90,000.00 82,573.32 Signed 2017-04-15 2017-05-04 2017-05-15 2017-06-06 2017-06-14 2017-06-17 tions nvelope ureaux et salle de réunion nagement, Coordination, an d Advocacy BF-WAHO-10501-GO-RFQ / A Component 5: Institutional C Request for Quota Single Stage - One E cquisition de véhicule 4x4 et IDA / D1310 apacity Building, Project Ma Post Limited 92,000.00 57,837.46 Completed 2017-09-09 2017-10-19 2017-10-21 2017-12-04 2017-12-20 2021-02-09 tions nvelope assurer la maintenance nagement, Coordination, an d Advocacy BF-WAHO-10502-GO-RFB / A Component 5: Institutional C cquisition d'équipement de c apacity Building, Project Ma Single Stage - One E IDA / D1310 Post Request for Bids Open - National 140,000.00 117,670.76 Completed 2017-09-15 2017-09-10 2017-09-20 2017-10-20 2017-10-26 2017-11-19 2017-11-06 2017-12-24 2017-11-30 2018-03-24 2021-02-09 ommunication (Visio confére nagement, Coordination, an nvelope nce) et interprétation d Advocacy BF-WAHO-BF-56086-GO-RFB / Trois (3) laboratoires mobile Component 2: Strengthening Open - Internationa Single Stage - One E IDA / D1310 Post Request for Bids 1,000,000.00 0.00 Canceled 2018-05-14 2018-05-19 2018-06-30 2018-07-30 2018-09-10 2019-03-09 s pour les laboratoires de réf of Laboratory Capacity l nvelope érences de la CEDEAO BF-WAHO-BF-209381-GO-RF Q / Acquisition d'équipement s médicaux et de tests de dia Component 3: Preparedness Request for Quota Single Stage - One E IDA / D1310 Post Limited 1,000,000.00 87,032.00 Signed 2021-01-04 2021-03-09 2021-02-28 2021-11-15 2021-03-30 2022-05-12 gnostic pour la prise en char and Emergency Response tions nvelope ge des cas du COVID-19 au p rofit des pays de la CEDEAO. BF-WAHO-BF-56107-GO-RFB Component 3: Preparedness Single Stage - One E / Médicaments et vaccins (st IDA / D1310 Post Request for Bids Open - National 350,000.00 0.00 Canceled 2018-08-20 2018-08-25 2018-09-24 2018-10-24 2018-11-28 2019-03-28 and Emergency Response nvelope ock régional de sécurité) BF-WAHO-BF-359636-GO-RF Component 5: Institutional C Q / Acquisition de matériels i apacity Building, Project Ma Request for Quota Single Stage - One E Pending Impl IDA / D1310 Post Limited 100,000.00 0.00 2023-05-21 2023-06-30 2023-08-29 nformatiques et accessoires nagement, Coordination, an tions nvelope ementation au profit du personnel de l'U d Advocacy GP NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-WAHO-BF-56115-NC-RFQ / Logiciel de suivi et de gesti Component 3: Preparedness Request for Quota Single Stage - One E IDA / D1310 Post Limited 50,000.00 0.00 Canceled 2018-09-15 2018-11-17 2019-01-16 on du stock régional de sécur and Emergency Response tions nvelope ité en médicaments et vaccin s CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-WAHO-10506-CS-QBS / R ecrutement d'une Agence d'E Component 1: Surveillance a Quality Based Sel Open - Internationa xécution Chargée de la mise TF / A2534 Prior 2,820,000.00 2,608,560.00 Signed 2017-03-20 2017-04-03 2017-04-13 2017-05-05 2017-04-28 2017-06-22 2017-05-03 2017-07-21 2017-05-08 2017-10-19 2017-05-23 2017-10-30 2018-05-23 nd Information Systems ection l en place de 47 Centres de Su rveillance Épidémiologique BF-WAHO-10510-CS-QBS / R ecrutement d'une Agence d'E Component 1: Surveillance a Quality Based Sel Open - Internationa xécution (Consultant) Chargé TF / A2534 Prior 1,175,000.00 1,174,965.00 Signed 2017-03-20 2017-04-03 2017-04-13 2017-05-05 2017-04-28 2017-06-22 2017-05-03 2017-07-21 2017-05-08 2017-10-19 2017-05-23 2017-10-30 2018-05-23 nd Information Systems ection l e du Renforcement des capa cités de 47 laboratoires de di stricts BF-WAHO-10529-CS-CQS / R ecrutement de consultant (fir Component 2: Strengthening Consultant Qualifi Open - Internationa IDA / D1310 Post 56,720.00 70,500.00 Completed 2017-03-27 2017-04-05 2017-04-11 2017-05-10 2017-07-06 2017-05-25 2017-07-29 2017-06-08 2017-08-08 2017-07-23 2018-08-12 me) pour l'élaboration du Pla of Laboratory Capacity cation Selection l n Stratégique des laboratoire s de l'Espace CEDEAO BF-WAHO-10542-CS-CQS / R ecrutement d'un cabinet pou Component 2: Strengthening Consultant Qualifi r élaborer le document de ré IDA / D1310 Post Open - National 59,720.00 87,700.35 Completed 2017-06-15 2017-08-12 2017-07-06 2017-08-03 2018-02-28 2017-08-17 2018-03-22 2017-09-15 2018-05-08 2017-10-15 2018-12-27 of Laboratory Capacity cation Selection glementation du transport int ernational des échantillons bi ologiques BF-WAHO-10543-CS-CQS / R ecrutement d'un cabinet po ur l'élaboration d'un Plan str Component 3: Preparedness Consultant Qualifi Open - Internationa IDA / D1310 Post 160,266.00 105,040.00 Completed 2017-07-10 2017-09-20 2017-07-31 2017-08-29 2018-02-22 2017-09-08 2018-03-22 2017-09-28 2018-05-07 2017-11-27 2018-09-30 atégique de Préparation et d and Emergency Response cation Selection l e Réponse aux épidémies et urgences sanitaires de la CE DEAO Page 1 BF-WAHO-10538-CS-CQS / R ecrutement d'un consultant ( firme) pour adapter l'outil inf Component 1: Surveillance a Consultant Qualifi IDA / D1310 Post Open - National 71,460.00 0.00 Canceled 2017-05-31 2017-06-15 2017-07-13 2017-07-27 2017-08-24 2017-10-23 ormatique existant de maniè nd Information Systems cation Selection re à intégrer les informations sanitaires de la santé humain e et animale BF-WAHO-BF-56138-CS-CQS Component 3: Preparedness Consultant Qualifi / Elaboration de la stratégie r IDA / D1310 Post Open - National 100,000.00 0.00 Canceled 2018-04-16 2018-03-05 2018-05-07 2018-06-20 2018-07-20 2018-08-24 2018-10-23 and Emergency Response cation Selection égionale sur les activités tran sfrontalières BF-WAHO-BF-310133-CS-CQ S / External consultation for t he cost effectiveness and effi Component 5: Institutional C ciency evaluation of the esta apacity Building, Project Ma Consultant Qualifi Open - Internationa Under Implement IDA / D1310 Post 250,000.00 0.00 2022-08-30 2022-12-02 2022-09-29 2023-03-09 2022-10-24 2022-11-03 2022-12-08 2023-01-22 blished 107 Centres of Epide nagement, Coordination, an cation Selection l ation miological Surveillance (CES) d Advocacy and the strengthened 107 He alth Districts laboratories fro m 1997 to 2021 in West Afric a countries. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-WAHO-10517-CS-CDS / E valuations des capacités des pays à prévenir, détecter et r Component 1: Surveillance a IDA / D1310 Prior Direct Selection Direct 1,250,000.00 1,464,480.00 Signed 2017-03-20 2017-03-27 2017-04-30 2017-08-14 2018-04-30 apidement répondre aux me nd Information Systems naces à la santé publique à t ravers l'outil JEE-RSI par l'OM S (Assistance technique) BF-WAHO-10522-CS-INDV / Recrutement d'un consultant Component 1: Surveillance a Individual Consult individuel pour conduire des IDA / D1310 Post Limited 46,290.00 11,670.00 Signed 2017-04-10 2017-04-25 2017-04-20 2017-11-23 2017-04-30 2017-11-28 2017-05-28 2017-12-08 2017-07-27 nd Information Systems ant Selection évaluations socio-environne mental du Benin (REDISSE 3) BF-WAHO-10530-CS-INDV / Component 5: Institutional C Individual Consult Recrutement d'un assistant a IDA / D1310 apacity Building, Project Ma Post Open 84,000.00 72,000.00 Terminated 2017-04-17 2017-06-06 2017-05-21 2017-12-08 2017-05-31 2018-01-05 2017-06-20 2018-02-02 2018-06-20 ant Selection u spécialiste en passation de nagement, Coordination, an marchés d Advocacy BF-WAHO-10532-CS-INDV / Component 5: Institutional C Individual Consult Recrutement d'un spécialiste IDA / D1310 apacity Building, Project Ma Post Open 96,000.00 96,000.00 Terminated 2017-04-17 2017-06-06 2017-05-21 2017-12-04 2017-05-31 2018-01-31 2017-06-20 2018-02-09 2018-06-20 ant Selection en sauvegarde l'environnem nagement, Coordination, an ent d Advocacy BF-WAHO-10513-CS-CDS / E valuations des performances Component 1: Surveillance a IDA / D1310 Prior Direct Selection Direct 1,600,000.00 1,525,950.00 Signed 2017-05-15 2017-05-30 2017-06-29 2017-07-25 2018-06-29 des services vétérinaires à tr nd Information Systems avers l'outil PVS par l'OIE BF-WAHO-10536-CS-CDS / A ppuyer à la poursuite de la fo Component 3: Preparedness rmation des FELTP à l'intenti IDA / D1310 Post Direct Selection Direct 106,250.00 0.00 Canceled 2017-06-15 2017-06-09 2017-06-30 2017-10-27 2017-07-27 2018-07-27 and Emergency Response on des pays anglophones et l usophones à travers l'Univers ité du Ghana BF-WAHO-10523-CS-INDV / Recrutement d'un consultant Component 1: Surveillance a Individual Consult individuel pour conduire des IDA / D1310 Post Limited 46,290.00 0.00 Canceled 2017-04-10 2017-04-25 2017-04-20 2017-04-30 2017-05-28 2017-07-27 nd Information Systems ant Selection évaluations socio-environne mental du Ghana (REDISSE 3 ) BF-WAHO-10528-CS-INDV / Recrutement d'un consultant Component 1: Surveillance a Individual Consult individuel pour conduire des IDA / D1310 Post Limited 46,290.00 0.00 Canceled 2017-04-10 2017-04-25 2017-04-20 2017-04-30 2017-05-28 2017-07-27 nd Information Systems ant Selection évaluations socio-environne mental du Côte d'Ivoire (REDI SSE 3) BF-WAHO-BF-34527-CS-INDV / Recrutement d'un consultan Component 1: Surveillance a Individual Consult t individuel pour conduire de IDA / D1310 Post Limited 46,290.00 14,028.00 Signed 2017-11-13 2017-11-10 2017-11-18 2017-11-23 2017-12-02 2017-11-28 2017-12-16 2017-12-15 2018-01-15 nd Information Systems ant Selection s évaluations socio-environn ementales du Niger (REDISSE 3) BF-WAHO-BF-34528-CS-INDV / Recrutement d'un consultan Component 1: Surveillance a Individual Consult t individuel pour conduire de IDA / D1310 Post Limited 46,290.00 14,028.00 Signed 2017-11-13 2017-11-13 2017-11-18 2017-11-20 2017-12-02 2017-12-08 2017-12-16 2017-12-15 2018-01-15 nd Information Systems ant Selection s évaluations socio-environn ementales en Mauritanie (RE DISSE 3) BF-WAHO-BF-34529-CS-INDV / Recrutement d'un consultan Component 1: Surveillance a Individual Consult t individuel pour conduire de IDA / D1310 Post Limited 46,920.00 14,028.00 Signed 2017-11-13 2017-11-13 2017-11-18 2017-11-23 2017-12-02 2017-12-12 2017-12-16 2017-12-18 2018-01-15 nd Information Systems ant Selection s évaluations socio-environn ementale du Mali (REDISSE 3 ) BF-WAHO-BF-56129-CS-INDV / Élaboration de la politique r Component 2: Strengthening Individual Consult IDA / D1310 Post Limited 70,000.00 84,900.00 Completed 2018-04-23 2018-05-21 2018-04-28 2018-09-19 2018-05-19 2018-12-24 2018-06-30 2019-01-31 2018-08-29 2019-07-20 égionale de biosécurité, de bi of Laboratory Capacity ant Selection o sûreté et de bio-informatiq ue de la CEDEAO BF-WAHO-BF-56293-CS-INDV Component 5: Institutional C / Appui l'équipe de finance p apacity Building, Project Ma Individual Consult IDA / D1310 Post Limited 95,000.00 95,000.00 Completed 2018-04-16 2018-07-19 2018-04-21 2018-08-17 2018-05-12 2019-03-05 2018-06-16 2019-03-18 2018-12-13 2019-09-30 our la mise à jour de SAP au nagement, Coordination, an ant Selection Grant management d Advocacy BF-WAHO-BF-56298-CS-INDV Component 5: Institutional C Individual Consult / Assistant au Coordonnateur IDA / D1310 apacity Building, Project Ma Post Open 96,000.00 7,000.00 Signed 2018-04-30 2019-02-14 2018-06-23 2020-01-15 2018-07-14 2020-02-07 2018-08-18 2020-03-31 2019-08-18 ant Selection du Projet REDISSE nagement, Coordination, an d Advocacy BF-WAHO-BF-56344-CS-CDS / Evaluation SLIPTA de base d es laboratoires des 5 pays ab Component 2: Strengthening ritant les laboratoires de réfé IDA / D1310 Post Direct Selection Direct 150,000.00 146,876.00 Completed 2018-06-08 2018-06-25 2018-06-18 2018-07-04 2018-08-22 2018-12-05 2019-08-22 2020-10-31 of Laboratory Capacity rence, Renforcer les capacité s des laboratoires et assuran ce qualité, Préparer les labor atoires en vue de l'accréditat ion Page 2 BF-WAHO-10535-CS-CDS / F ormation en FELTP - Master, de 30 Etudiants des pays fra Component 3: Preparedness IDA / D1310 Prior Direct Selection Direct 1,800,000.00 1,711,316.00 Signed 2018-06-08 2018-07-07 2017-10-27 2018-09-19 2018-07-27 2020-09-18 ncophones et lusophones à tr and Emergency Response avers l'Université de Ouagad ougou avec l'appui de CDC F ondation BF-WAHO-BF-64067-CS-CDS / Formation en FELTP - Maste Component 3: Preparedness r, de 20 Etudiants des pays a IDA / D1310 Prior Direct Selection Direct 1,060,250.00 1,040,045.00 Signed 2018-06-08 2018-06-18 2018-06-04 2018-08-22 2018-07-27 2020-08-21 and Emergency Response nglophones et lusophones à t ravers l'Université du Ghana BF-WAHO-BF-74588-CS-INDV Component 5: Institutional C / RECRUTEMENT D'UN CONS apacity Building, Project Ma Individual Consult IDA / D1310 Post Limited 6,000.00 1,034.84 Completed 2018-10-01 2018-09-20 2018-10-06 2018-09-20 2018-10-27 2019-02-26 2018-12-01 2019-03-07 2019-01-30 2019-03-21 ULTANT INDIVIDUEL POUR LA nagement, Coordination, an ant Selection RÉALISATION DU LOGO DU P d Advocacy ROJET REDISSE BF-WAHO-BF-90369-CS-INDV / RECRUTEMENT D'UN(E) (1) Component 5: Institutional C CHARGE DE PROGRAMME EN apacity Building, Project Ma Individual Consult IDA / D1310 Post Open 85,000.00 0.00 Canceled 2019-01-10 2019-03-13 2019-02-28 2019-03-21 2019-04-25 2020-04-24 ADMINISTRATION ET FINANC nagement, Coordination, an ant Selection ES DU CENTRE REGIONAL DE d Advocacy SANTE ANIMALE (CRSA) DE B AMAKO BF-WAHO-BF-95886-CS-INDV / Recrutement d'un Consulta nt Individuel pour l'étude régi Component 3: Preparedness Individual Consult onale sur la gestion des déch IDA / D1310 Post Open 40,000.00 40,058.00 Signed 2019-03-31 2019-03-13 2019-05-19 2019-11-25 2019-06-09 2019-11-26 2019-07-14 2020-03-09 2019-09-12 and Emergency Response ant Selection ets liés aux soins de santé en Afrique de l'Ouest et élaborat ion du plan stratégique régio nal 2019-2023 BF-WAHO-BF-95889-CS-INDV / Recrutement d'un Consulta nt pour l'élaboration de la Dir Component 3: Preparedness Individual Consult IDA / D1310 Post Open 25,000.00 50,325.87 Completed 2019-06-30 2019-03-26 2019-08-18 2019-11-25 2019-09-08 2019-11-26 2019-10-13 2020-03-09 2019-12-12 2020-09-28 ective d'harmonisation du ca and Emergency Response ant Selection dre législatif de la gestion de s déchets liés aux soins de sa nté en Afrique de l'Ouest BF-WAHO-BF-96036-CS-INDV Component 5: Institutional C Individual Consult / Recrutement d'un coordonn IDA / D1310 apacity Building, Project Ma Post Open 102,000.00 110,500.00 Signed 2019-03-31 2019-03-13 2019-05-24 2019-09-16 2019-06-14 2019-10-25 2019-07-19 2019-11-15 2020-07-18 ant Selection ateur pour le projet REDISSE nagement, Coordination, an d Advocacy BF-WAHO-BF-96546-CS-CDS / Assurer la continuité de la p Component 5: Institutional C rise en charge de l'experte e apacity Building, Project Ma IDA / D1310 Post Direct Selection Direct 96,000.00 168,000.00 Signed 2019-02-28 2019-03-05 2019-03-10 2019-11-25 2019-05-14 2020-02-04 2020-05-13 n charge de la plateforme ré nagement, Coordination, an gionale de partage d'informa d Advocacy tion sur les maladies à poten tiel épidémique. BF-WAHO-BF-109813-CS-IND Component 5: Institutional C Individual Consult V / RECRUTEMENT D'UN COM IDA / D1310 apacity Building, Project Ma Post Direct 85,000.00 84,000.00 Signed 2019-04-11 2019-05-10 2019-04-21 2019-08-06 2019-05-12 2019-09-30 2019-06-16 2019-10-02 2020-06-15 ant Selection PTABLE POUR LE CRSA nagement, Coordination, an d Advocacy BF-WAHO-BF-109815-CS-CD S / Poursuite de la mise en pl Component 1: Surveillance a IDA / D1310 Prior Direct Selection Direct 3,000,000.00 3,376,587.00 Signed 2019-04-11 2019-04-29 2019-04-21 2019-06-03 2019-06-25 2020-03-05 2021-06-24 ace de 53 centres de surveill nd Information Systems ance épidémiologiques par le CCISD. BF-WAHO-BF-109816-CS-CD S / Poursuite du renforcemen t des capacités de 53 laborat Component 1: Surveillance a IDA / D1310 Prior Direct Selection Direct 1,500,000.00 1,602,173.00 Signed 2019-04-11 2019-04-21 2019-06-03 2019-06-25 2020-03-10 2021-06-24 oires de districts sanitaires a nd Information Systems britant les centres de surveill ances épidémiologiques par l a Fondation Mérieux. BF-WAHO-BF-90374-CS-INDV / RECRUTEMENT D'UN(E) (1) Component 5: Institutional C CHARGÉ DE PROGRAMME PRI apacity Building, Project Ma Individual Consult IDA / D1310 Post Open 120,000.00 0.00 Canceled 2019-01-10 2019-10-16 2019-02-28 2019-03-21 2019-04-25 2020-04-24 NCIPAL EN SANTÉ ANIMALE D nagement, Coordination, an ant Selection U CENTRE RÉGIONAL DE SAN d Advocacy TÉ ANIMALE (CRSA) DE BAMA KO. BF-WAHO-BF-128025-CS-CD S / Poursuite de la Formation Component 3: Preparedness IDA / D1310 Prior Direct Selection Direct 1,800,000.00 1,332,410.12 Signed 2019-10-31 2019-09-18 2019-11-29 2019-06-03 2020-02-11 2020-04-10 2022-02-10 FELTP pour 30 étudiants par l and Emergency Response 'université de Ouagadougou BF-WAHO-BF-128026-CS-CD S / Poursuite de la formation Component 3: Preparedness IDA / D1310 Prior Direct Selection Direct 1,100,000.00 930,000.00 Signed 2019-10-31 2019-09-18 2019-11-10 2019-06-03 2020-01-14 2019-11-15 2022-01-13 FELTP pour 20 étudiants par l and Emergency Response 'université du Ghana BF-WAHO-BF-109818-CS-CD S / OMS AFRO CONTRAT D'AS Component 1: Surveillance a IDA / D1310 Prior Direct Selection Direct 1,500,000.00 1,000,000.00 Signed 2019-09-30 2019-09-18 2019-10-10 2019-06-03 2019-12-14 2020-03-14 2021-12-13 SISTANCE TECHNIQUE DANS nd Information Systems LA MISE EN ŒUVRE DU PROJ ET REDISSE BF-WAHO-BF-109822-CS-CD S / OIE CONTRAT D'ASSISTAN Component 1: Surveillance a IDA / D1310 Prior Direct Selection Direct 1,500,000.00 1,000,000.00 Signed 2019-09-30 2019-09-18 2019-10-10 2019-06-03 2019-12-14 2019-12-20 2021-12-13 CE TECHNIQUE POUR LA MIS nd Information Systems E EN ŒUVRE DU PROJET RED ISSE. BF-WAHO-BF-133770-CS-CD S / OSLO UNIVERSITY: Techni Component 1: Surveillance a cal assistance to WAHO, ECO IDA / D1310 Post Direct Selection Direct 300,000.00 0.00 Canceled 2019-10-30 2019-10-24 2019-11-28 2020-02-10 2021-02-09 nd Information Systems WAS and Mauritania in the i mplementation of DHI S2 BF-WAHO-BF-90374-CS-INDV Component 5: Institutional C -2 / RECRUTEMENT D'UN CHA apacity Building, Project Ma Individual Consult IDA / D1310 Post Open 96,000.00 0.00 Canceled 2019-10-16 2019-10-24 2019-12-04 2019-12-25 2020-01-29 2021-01-28 RGE DE PROGRAMME EN SAN nagement, Coordination, an ant Selection TE ANIMALE POUR LE CRSA d Advocacy BF-WAHO-BF-90374-CS-INDV Component 5: Institutional C Individual Consult -3 / CRSA RECRUTEMENT D'U IDA / D1310 apacity Building, Project Ma Post Open 120,000.00 96,000.00 Terminated 2019-12-15 2020-07-09 2020-02-02 2021-02-19 2020-02-23 2021-04-02 2020-03-29 2021-06-04 2021-03-29 ant Selection N CHARGE DE PROGRAMME nagement, Coordination, an ANIMALE d Advocacy BF-WAHO-BF-167650-CS-IND Component 5: Institutional C V / Recrutement d'un compta apacity Building, Project Ma Individual Consult IDA / D1310 Post Open 84,000.00 90,000.00 Signed 2020-04-15 2020-04-07 2020-06-03 2021-01-21 2020-06-24 2021-01-29 2020-07-29 2021-10-19 2021-07-24 ble au profit de l'Unité de Ge nagement, Coordination, an ant Selection stion des Projets (UGP) d Advocacy Page 3 BF-WAHO-BF-129526-CS-CD Component 5: Institutional C S / Assurer la continuité de la apacity Building, Project Ma IDA / D1310 Post Direct Selection Direct 96,000.00 0.00 Canceled 2019-09-15 2019-09-20 2019-09-30 2021-09-30 prise en charge de l'expert in nagement, Coordination, an formatique en système d'info d Advocacy rmation sanitaire. BF-WAHO-BF-109812-CS-IND Component 5: Institutional C Individual Consult V / RECRUTEMENT D'UN CHA IDA / D1310 apacity Building, Project Ma Post Direct 102,000.00 0.00 Canceled 2019-04-11 2019-04-20 2019-04-21 2019-05-12 2019-06-16 2020-06-15 ant Selection RGE DE SANTÉ ANIMALE AU nagement, Coordination, an CRSA d Advocacy BF-WAHO-BF-56286-CS-INDV / Elaboration du manuel de p Component 3: Preparedness Individual Consult IDA / D1310 Post Limited 37,890.00 0.00 Canceled 2018-08-20 2018-08-29 2018-08-25 2019-01-23 2018-09-15 2018-10-20 2018-11-19 rocédures du stock de sécurit and Emergency Response ant Selection é des médicaments et équip ements d'urgence BF-WAHO-BF-107340-CS-IND V / ÉLABORATION DU PLAN S Component 2: Strengthening Individual Consult TRATÉGIQUE DE BIO BANQUE IDA / D1310 Post Limited 70,000.00 0.00 Canceled 2019-04-04 2019-04-11 2019-04-09 2019-04-30 2019-06-11 2019-08-10 of Laboratory Capacity ant Selection RÉGIONALE POUR LES PAYS MEMBRES DE LA CEDEAO BF-WAHO-BF-209383-CS-IND Component 5: Institutional C V / Recrutement d'un Spécial apacity Building, Project Ma Individual Consult iste en Gestion Financière au IDA / D1310 Post Open 96,000.00 0.00 Signed 2020-12-29 2017-07-18 2021-02-16 2017-12-05 2021-03-09 2018-01-08 2021-04-13 2022-04-08 nagement, Coordination, an ant Selection profit de l'Unité de Gestion d d Advocacy es Projets_UGP: Régularisatio n dans le STEP BF-WAHO-BF-221949-CS-IND Component 5: Institutional C V / Recrutement d'un nouvea apacity Building, Project Ma Individual Consult Under Implement IDA / D1310 Post Open 96,000.00 0.00 2021-03-31 2021-06-16 2021-04-29 2022-05-19 2021-05-20 2021-06-24 2022-06-19 u spécialiste en sauvegarde nagement, Coordination, an ant Selection ation environnementale et sociale d Advocacy BF-WAHO-BF-248823-CS-IND Component 5: Institutional C Individual Consult Under Implement V / Recrutement de l’interprè IDA / D1310 apacity Building, Project Ma Post Direct 96,000.00 0.00 2021-08-26 2021-08-13 2021-09-05 2021-09-26 2021-10-31 2022-10-31 ant Selection ation te/traducteur au profit de l'U nagement, Coordination, an GP d Advocacy BF-WAHO-BF-293822-CS-IND Component 5: Institutional C V / Recrutement du Coordon apacity Building, Project Ma Individual Consult Under Implement nateur Général de l'Unité de IDA / D1310 Post Open 70,000.00 0.00 2022-05-20 2022-05-19 2022-06-18 2022-06-28 2022-07-27 2023-01-23 nagement, Coordination, an ant Selection ation Gestion des Projets sur finan d Advocacy cement de la Banque mondia le BF-WAHO-BF-293824-CS-CD Component 5: Institutional C S / Recrutement d'un (1) Assi IDA / D1310 apacity Building, Project Ma Post Direct Selection Direct 42,000.00 48,000.00 Terminated 2022-05-20 2022-02-07 2022-05-30 2022-03-02 2022-07-05 2022-05-22 2023-01-31 stant en Passation des March nagement, Coordination, an és d Advocacy BF-WAHO-BF-293823-CS-CD Component 5: Institutional C S / Recrutement d’un Spéciali IDA / D1310 apacity Building, Project Ma Post Direct Selection Direct 56,000.00 0.00 Canceled 2022-05-20 2022-05-30 2022-07-05 2023-01-31 ste de la Communication et d nagement, Coordination, an u Plaidoyer d Advocacy BF-WAHO-BF-299241-CS-IND Component 5: Institutional C V / RECRUITMENT OF A COM apacity Building, Project Ma Individual Consult Under Implement IDA / D1310 Post Open - National 32,000.00 0.00 2022-07-26 2022-07-20 2022-08-29 2022-09-08 2022-10-13 2023-04-11 MUNICATIONS AND ADVOCA nagement, Coordination, an ant Selection ation CY d Advocacy SPECIALIST BF-WAHO-BF-337681-CS-CD S / Mise en place de 40 nouv eaux CSE (Centre de Surveill Component 1: Surveillance a Direct - Internation Under Implement TF / B1239 Prior Direct Selection 4,000,000.00 0.00 2023-01-26 2023-02-07 2023-02-02 2023-02-15 2023-02-25 2023-07-25 ance Epidémiologique) au pr nd Information Systems al ation ofit de 3 pays (Benin, Nigeria , Togo) par Santé Monde: co mposante surveillance BF-WAHO-BF-337687-CS-CD S / Mise en place de 40 nouv eaux CSE (Centre de Surveill Component 1: Surveillance a Direct - Internation Under Implement TF / B1239 Prior Direct Selection 2,000,000.00 0.00 2023-01-26 2023-04-28 2023-02-02 2023-02-15 2023-02-25 2023-07-25 ance Epidémiologique) au pr nd Information Systems al ation ofit de 3 pays (Benin, Nigeria , Togo) par Fondation Merieu x: Composante laboratoire BF-WAHO-BF-361516-CS-IND Component 5: Institutional C V / Recrutement d'un consult apacity Building, Project Ma Individual Consult Direct - Internation Under Implement IDA / D1310 Post 50,000.00 0.00 2023-05-19 2023-05-22 2023-06-05 2023-06-03 2023-06-20 2023-07-25 2023-08-24 ant individuel pour l'évaluati nagement, Coordination, an ant Selection al ation on finale du projet REDISSE d Advocacy BF-WAHO-BF-361508-CS-CD S / Réalisation de documenta Component 5: Institutional C ires sur le Projet Régional d’A apacity Building, Project Ma Direct - Internation Under Implement IDA / D1310 Post Direct Selection 80,000.00 0.00 2023-05-19 2023-05-25 2023-06-03 2023-06-03 2023-07-12 2023-08-26 mélioration des Systèmes de nagement, Coordination, an al ation Surveillance des Maladies en d Advocacy Afrique de l’Ouest (REDISSE) BF-WAHO-BF-361641-CS-IND V / Recrutement d'un consult ant individuel pour la capitali Component 5: Institutional C sation des acquis et la docu apacity Building, Project Ma Individual Consult Direct - Internation Under Implement IDA / D1310 Post 60,000.00 0.00 2023-05-19 2023-05-22 2023-06-05 2023-06-03 2023-06-20 2023-07-21 2023-08-20 mentation des bonnes pratiq nagement, Coordination, an ant Selection al ation ue sur le Projet Régional d’A d Advocacy mélioration des Systèmes de Surveillance des Maladies en Afrique de l’Ouest (REDISSE) Page 4 Procurement Plan I. General 1. Project Information Country : Kenya Recipient : Republic of Kenya Project Name : National Agriculture and Rural Inclusive Growth Loan Credit No. : IDA 59000 2. Date of General Procurement Notice : 9th February 2018 3. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services 1. Thresholds for the Method of Procurement: Method of Procurement Thresholds for Method (US$ equivalent) Open International (Goods) Equal to or more than 3 million Open National ( Goods) – Open < $3 million Tender as per PPDA 2015 RFQ (Goods) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Open International (Works) Equal to or more than 15 million Open National (Works) - Open Less than 15 million Tender as per PPDA 2015 RFQ (works) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Method of Procurement Thresholds for Method (US$ equivalent) Open International (Non-consulting Equal to or More than 3 million Services) Open National (Non-consulting Less than 3 million Services) - Open Tender as per PPDA 2015 Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations Prior Review: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection (Project Procurement Risk Rating is “High”): (a) Goods, information technology and Non-consulting Services: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1.5 million (b) Works (including turnkey, supply & installation of plant and equipment and PPP); First procurement under the project irrespective of value and all procurements estimated to cost more than USD 5 million and The prior review thresholds will be reviewed during the implementation of the project and modified, based on the risk assessment. 2. For contracts subject to prior review, the Borrower shall seek the Bank’s no objection before agreeing to: a. an extension of the stipulated time for execution of a contract that has an impact on the planned completion of the project; b. any material modification of the scope of the Works, Goods, Non- consulting services or Consulting Services, or other significant changes to the terms and conditions of the contract; c. any variation order or contract amendment (except in cases of extreme urgency), including due to extension of time, that singly or combined with all previous variation orders or amendments, increases the original contract amount by more than 15% (fifteen percent); or d. the proposed termination of the contract. The Borrower / IA shall provide a copy of all amendments to the contract to the Bank for its records. 3. Prequalification Not Applicable Domestic Preference. The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations. Domestic preference shall not apply in the procurement of works. 4. Reference to Standard Procurement Documents Bank’s Standard RFB Goods and RFP Consulting Services dated July 2016 will be used as a base and incorporating suitable modifications and the same would be agreed with the Bank subject international competition. 5. Any Other Special Procurement Arrangements A. Procurement approach under CDD Approach by Communities: Applicable if stipulated in the PAD. B. When approaching the national market, as agreed in the Procurement Plan, the Open Tender procedure of Public Procurement and Asset Disposal Act 2015 and Regulations 2017 may be used. The specific Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. Other national procurement arrangements (other than national open competitive procurement), that may be applied by the Borrower (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. In all cases, the national procurement procedures to be used shall give due attention to quality aspects. 6. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Selection methods of procurement of Consultants' Services (Firms): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Quality and Cost Based As per requirements of para 7.3 of the Selection (QCBS) Regulations Quality Based Selection As per requirements of para 7.8 to 7.10 (QBS) of the Regulations Selection based on a Fixed As per requirements of para 7.4 and 7.5 of the Budget (FBS) Regulations Selection Based on Least As per requirements of para 7.6 and 7.7 of the Cost Basis (LCS) Regulations Selection based on As per requirements of para 7.11 and 7.12 of Consultant’s Qualification the Regulations (CQ) Direct Must meet the requirements of Para 7.13 to 7.15 of the Regulations, and with prior agreement in PP with the Bank. The short list may consist of all National consultants in case the estimated cost is less than USD 300,000 Procurement methods for Selection of Individual Consultants (IC): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Open Competitive As per requirements of para 7.36 and 7.37 of Selection the Regulations Limited Competitive As per requirements of para 7.38 of the Selection Regulations Direct Must meet the requirements of Para 7.39 of the Regulations, and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Regulations Prior Review Thresholds: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 0.5 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.2 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. PROCUREMENT Kenya : National Agricultural and Rural Inclusive Growth Project PLAN General Information Country: Kenya 2019-10-04 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153349 GPN Date: 2018-02-09 Project Name: National Agricultural and Rural Inclusive Growth Project Loan / Credit No: IDA / 59000 Samburu County Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-SAMBURU COUNTY-1393 Project Coordination and Ma Request for Quota Single Stage - One E 2020-02-2 80-CW-RFQ / office refurbish IDA / 59000 Post Limited 27,000.00 24,467.18 Signed 2019-10-23 2020-02-03 2019-11-30 2020-03-01 nagement tions nvelope 8 ment at samburu county KE-SAMBURU COUNTY-2018 99-CW-RFQ / Construction of Supporting County Communi Single Stage - One E Under Imple 2021-03-2 118,236 cubic meters water IDA / 59000 Post Request for Bids Open - National 424,830.00 0.00 2020-11-02 2020-03-25 2020-11-09 2020-11-23 2020-04-14 2020-12-07 2021-10-07 2020-12-28 ty-Led Development nvelope mentation 8 pan in Lesepetei village, Baa wa ward, Samburu North Sub -county KE-SAMBURU COUNTY-2019 02-CW-RFB / Rehabilitation of Supporting County Communi Single Stage - One E Under Imple 2021-03-2 IDA / 59000 Post Request for Bids Open - National 258,595.00 0.00 2020-11-02 2021-08-24 2020-11-09 2020-11-23 2021-09-23 2020-12-07 2021-09-28 2020-12-28 65,540 cubic meters pan in S ty-Led Development nvelope mentation 8 ordo village, Samburu East S ub-County KE-SAMBURU COUNTY-2019 06-CW-RFB / Construction of Supporting County Communi Single Stage - One E Under Imple 2021-03-0 Tankar livestock sale yard in IDA / 59000 Post Request for Bids Open - National 271,000.00 0.00 2020-11-09 2021-08-24 2020-11-16 2020-11-30 2021-09-08 2020-12-14 2021-01-04 ty-Led Development nvelope mentation 5 Tankar village, Ndoto ward, S amburu North Sub-County. KE-SAMBURU COUNTY-2025 49-CW-RFB / Construction of Supporting County Communi Single Stage - One E Under Imple 2021-03-0 IDA / 59000 Post Request for Bids Open - National 250,000.00 0.00 2020-11-09 2021-09-24 2020-11-16 2020-11-30 2021-09-08 2020-12-14 2021-10-07 2021-01-04 Kisima Livestock Sale yard to ty-Led Development nvelope mentation 5 support sheep/goats value ch ain KE-SAMBURU COUNTY-2073 Strengthening Producer Org 94-CW-RFQ / Construction of Request for Quota Single Stage - One E 2021-02-1 IDA / 59000 anizations and Value Chain Post Limited 195,000.00 0.00 Signed 2020-12-12 2021-08-23 2021-02-06 Livestock Sale yard to suppor tions nvelope 5 Development t sheep/goats value chain in Archer's Post KE-SAMBURU COUNTY-3225 Strengthening Producer Org Request for Quota Request for Quota Single Stage - One E Under Imple 2023-06-2 67-CW-RFQ / Construction of IDA / 59000 anizations and Value Chain Post Limited tions (Non Bank-S 80,837.19 0.00 2022-11-01 2022-12-15 2022-12-27 tions nvelope mentation 5 Logorate Hay Barn Development PD) KE-SAMBURU COUNTY-3225 Strengthening Producer Org Request for Quota Request for Quota Single Stage - One E Under Imple 2023-06-2 80-CW-RFQ / Construction of IDA / 59000 anizations and Value Chain Post Limited tions (Non Bank-S 75,447.08 0.00 2022-11-01 2022-12-15 2022-12-27 tions nvelope mentation 5 Kisima Hay Barn Development PD) KE-SAMBURU COUNTY-1386 Project Coordination and Ma Request for Quota Single Stage - One E 2020-02-1 84-CW-RFQ / Refurbishment IDA / 59000 Post Limited 26,733.00 0.00 Canceled 2019-11-13 2019-12-19 nagement tions nvelope 7 of Samburu CPCU offices KE-SAMBURU COUNTY-3415 92-CW-RFQ / Procurement of Strengthening Producer Org Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-04-0 works for the construction of IDA / 59000 anizations and Value Chain Post Limited tions (Non Bank-S 55,000.00 0.00 2023-02-18 2023-03-09 tions nvelope lementation 8 2 paddocks, 2 troughs, and p Development PD) ens at Nomoitio livestock imp rovement centre KE-SAMBURU COUNTY-3608 Strengthening Producer Org Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-08-1 68-CW-RFQ / construction of IDA / 59000 anizations and Value Chain Post Open - National tions (Non Bank-S 48,000.00 0.00 2023-05-13 2023-06-12 tions nvelope lementation 1 bee house for hope enterpris Development PD) e an (FPO) KE-SAMBURU COUNTY-3656 Request for Quota Supporting Community-Driv Request for Quota Single Stage - One E Pending Imp 2023-07-1 32-CW-RFQ / drilling and equi IDA / 59000 Post Limited tions (Non Bank-S 61,225.00 0.00 2023-06-08 2023-06-27 en Development tions nvelope lementation 8 pping of Archers post Livesto PD) ck market. KE-SAMBURU COUNTY-3672 05-CW-RFQ / construction of Request for Quota Supporting County Communi Request for Quota Single Stage - One E Pending Imp 2023-08-0 elevated water tank, solar pa IDA / 59000 Post Limited tions (Non Bank-S 27,210.00 0.00 2023-06-15 2023-07-04 ty-Led Development tions nvelope lementation 3 nels tower, Well and pipe wor PD) ks for Sordo and Nontoto wat er pan. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-SAMBURU COUNTY-1180 30-GO-RFQ / Managers Execu tive Desk Working Desks wit h cable Managements,electri Project Coordination and Ma Request for Quota Single Stage - One E c and data Points 9 Pieces,9 IDA / 59000 Post Limited 18,500.00 32,761.02 Signed 2019-10-14 2020-05-03 2019-12-09 2020-05-02 2020-01-08 nagement tions nvelope orthopaedic seat ,2 coffee ta bles,15 office chairs,10 wood en tables,10 wooden cabinet s,10 steel cabinets,3 visitors steel chairs,1 executive visit ors chair. KE-SAMBURU COUNTY-1682 67-GO-RFQ / Purchase ,Suppl Supporting Community-Driv Request for Quota Single Stage - One E IDA / 59000 Post Limited 80,000.00 61,186.98 Completed 2020-05-13 2020-08-28 2020-06-24 2020-09-19 2020-07-24 2021-06-16 y and delivery of 20 motorcy en Development tions nvelope cle for ward extension officer s KE-SAMBURU COUNTY-1727 44-GO-RFQ / PURCHASE OF V IRTUAL MEETING AND COMM Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Limited 73,000.00 65,412.77 Signed 2020-05-22 2020-09-01 2020-07-03 2020-10-01 2020-08-17 UNICATION ,HIGH SPEED BR nagement tions nvelope OAD BAND INTERNET,NETW ORK ROUTER,NETWORK FIRE WALL Page 1 KE-SAMBURU COUNTY-1727 Project Coordination and Ma Request for Quota Single Stage - One E 43-GO-RFQ / Purchase of lapt IDA / 59000 Post Limited 8,000.00 7,269.83 Signed 2020-05-20 2020-10-26 2020-07-15 2020-09-11 2020-08-14 nagement tions nvelope ops for CPCU staff, Samburu County KE-SAMBURU COUNTY-2018 89-GO-RFQ / Procurement of Supporting County Communi Request for Quota Single Stage - One E IDA / 59000 Post Open - National 2,000.00 0.00 Canceled 2020-11-07 2021-01-02 2021-02-01 4 Hand held GPS tools for co ty-Led Development tions nvelope unty technical officers KE-SAMBURU COUNTY-2018 Supporting County Communi Request for Quota Single Stage - One E Pending Impl 85-GO-RFQ / Procurement of IDA / 59000 Post Limited 40,000.00 0.00 2020-12-12 2021-02-06 2021-08-05 ty-Led Development tions nvelope ementation Geodetic RTK for county tech nical officers KE-SAMBURU COUNTY-1393 Project Coordination and Ma Request for Quota Single Stage - One E 53-GO-RFQ / Supply, Delivery IDA / 59000 Post Limited 18,500.00 0.00 Canceled 2019-10-20 2019-11-23 2019-12-23 nagement tions nvelope and installation of office Furn iture KE-SAMBURU COUNTY-2018 Supporting County Communi Request for Quota Single Stage - One E 88-GO-RFQ / Purchase of 4 cli IDA / 59000 Post Limited 1,600.00 0.00 Canceled 2020-12-12 2021-02-06 2021-03-08 ty-Led Development tions nvelope nometers for county technica l officers KE-SAMBURU COUNTY-2018 91-GO-RFQ / Procurement of Supporting County Communi Request for Quota Single Stage - One E IDA / 59000 Post Limited 12,000.00 0.00 Canceled 2020-12-12 2021-01-30 2021-03-01 4 mobile mappers GIS receiv ty-Led Development tions nvelope er for county technical officer s KE-SAMBURU COUNTY-3389 Strengthening Producer Org Request for Quota Single Stage - One E 21-GO-RFQ / Procurement of IDA / 59000 anizations and Value Chain Post Limited 3,904.00 0.00 Signed 2023-02-04 2023-03-06 2023-02-20 2023-03-22 tions nvelope pasture seeds 3,580 kgs of B Development oma Rhodes KE-SAMBURU COUNTY-3389 Strengthening Producer Org Request for Quota Single Stage - One E 26-GO-RFQ / Procurement of IDA / 59000 anizations and Value Chain Post Limited 12,500.00 0.00 Signed 2023-02-04 2023-03-03 2023-02-20 2023-03-22 tions nvelope top fertilizer for pasture prod Development uction - 25,000kg KE-SAMBURU COUNTY-3389 Strengthening Producer Org Request for Quota Single Stage - One E Under Imple 30-GO-RFQ / Supply of suppl IDA / 59000 anizations and Value Chain Post Limited 10,000.00 0.00 2023-02-04 2023-03-06 2023-02-26 2023-03-28 tions nvelope mentation ements and feeds - 16700kg Development KE-SAMBURU COUNTY-3389 32-GO-RFQ / Procurement of Strengthening Producer Org Request for Quota Single Stage - One E hay harvesting equipment - 2 IDA / 59000 anizations and Value Chain Post Limited 82,000.00 0.00 Signed 2023-02-04 2023-03-06 2023-02-26 2023-03-28 tions nvelope hay rakes, 2 hay baling mach Development ine and 2 hay moving machi ne KE-SAMBURU COUNTY-3389 40-GO-RFQ / Farm ponds equ Supporting Community-Driv Request for Quota Single Stage - One E IDA / 59000 Post Limited 93,560.00 0.00 Signed 2023-02-04 2023-03-06 2023-02-20 2023-03-22 ipment -10,080 dam liners, 4 en Development tions nvelope 8 water tanks (2,000ltrs), sol ar pump kits 48 pieces KE-SAMBURU COUNTY-3389 38-GO-RFQ / Procurement of Supporting County Communi Request for Quota Single Stage - One E IDA / 59000 Post Limited 21,000.00 0.00 Signed 2023-02-04 2023-03-07 2023-03-06 2023-04-05 14 smartphones for data coll ty-Led Development tions nvelope ection and communication KE-SAMBURU COUNTY-3415 90-GO-RFQ / Procurement of Strengthening Producer Org Request for Quota Single Stage - One E 500 sheep/goats as seed cap IDA / 59000 anizations and Value Chain Post Limited 25,000.00 0.00 Signed 2023-02-18 2023-03-06 2023-03-11 2023-04-10 tions nvelope ital for Maralal Sheep/goats F Development PO as part of the the approve d VCUMG proposal. KE-SAMBURU COUNTY-3631 Strengthening Producer Org Request for Quota Single Stage - One E Pending Impl 74-GO-RFQ / supply and deliv IDA / 59000 anizations and Value Chain Post Open - National 17,308.00 0.00 2023-05-23 2023-06-14 2023-07-14 tions nvelope ementation ery of desktops and printers Development NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-SAMBURU COUNTY-3389 Strengthening Producer Org Request for Propo Single Stage - One E 39-NC-RFP / Ploughing and h IDA / 59000 anizations and Value Chain Post Limited 28,250.00 0.00 Canceled 2023-01-30 2023-02-04 2023-02-11 2023-02-12 2023-02-20 2023-03-22 sals nvelope arrowing of 500 acres Development KE-SAMBURU COUNTY-3415 Strengthening Producer Org Pending Impl 98-CS-QBS / Procurement of IDA / 59000 anizations and Value Chain Post Direct Selection Direct - National 30,000.00 0.00 2023-05-10 2023-05-15 2023-05-31 2023-07-30 ementation Virtual Market for sheep/goat Development s marketing. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-SAMBURU COUNTY-1640 36-CS-CQS / Procurement of Service Provider (SP) for Loca Supporting Community-Driv Consultant Qualifi l Chicken value Chain to prov IDA / 59000 Post Open - National 25,000.00 0.00 Canceled 2020-04-30 2020-07-09 2020-05-14 2020-05-28 2020-06-11 2020-07-09 2021-12-31 en Development cation Selection ide specialized extension ser vice through contracted servi ce delivery mechanism in Sa mburu County KE-SAMBURU COUNTY-1640 21-CS-CQS / Procurement of Service Provider (SP) for hon Supporting Community-Driv Consultant Qualifi ey value chain to provide spe IDA / 59000 Post Open - National 50,000.00 0.00 Canceled 2020-04-30 2020-09-23 2020-05-14 2020-05-28 2020-06-11 2020-07-09 2021-12-31 en Development cation Selection cialized extension service thr ough contracted service deliv ery arrangement in Samburu County KE-SAMBURU COUNTY-1640 28-CS-CQS / Procurement of Service Provider (SPs) for dai Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 50,000.00 0.00 Canceled 2020-04-30 2020-09-23 2020-05-14 2020-05-28 2020-06-11 2020-07-02 2021-12-31 ry Value Chain to provide sp en Development cation Selection ecialized extension service th rough contracted service deli very mechanism. Page 2 KE-SAMBURU COUNTY-1640 37-CS-CQS / Procurement of Service Provider (SP) for She Supporting Community-Driv Consultant Qualifi ep/goats value Chain to provi IDA / 59000 Post Open - National 50,000.00 0.00 Canceled 2020-04-30 2020-09-23 2020-05-14 2020-05-28 2020-06-11 2020-07-09 2021-12-31 en Development cation Selection de specialized extension serv ice through contracted servic e delivery arrangement in Sa mburu County INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 1. Procurement Plan. Textual part Preamble 1. In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (Fourth Edition, November 2020) (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. 2. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. 3. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements 4. In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), procurement under World Bank financed operations may be carried out in accordance with “Tendering with Unlimited Participation” method set forth in the Law of the Republic of Tajikistan “Оn Public Procurement of Goods, Works and Services”, # 168 dated March 3, 2006 (as amended by Law #815, the “Law of the Republic of Tajikistan on “Introduction of Amendments and Additions to the Law of the Republic of Tajikistan on ‘Public Procurement of Goods, Works and Services’” dated April 16, 2012), provided that such arrangements continue to meet requirements of the paragraph 5.4 of the Procurement Regulations and the following conditions: • The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, World Bank Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; • The request for bids/request for proposals document, including contract forms, acceptable to the Bank shall be used. • The request for bids/request for proposals document and contract shall provide the right to the Bank to review procurement documentation and activities. • Borrower shall put in place an effective complaints review mechanism with procurement related complaints and shall disclose the details in all the bidding documents. All complaints shall be recorded by the Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. • No preference shall be applied under competitive bidding following national market approach. 5. Other national procurement arrangements such as tendering with limited participation, request for quotations, direct contracting, may be used on the above stated conditions. 6. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable.” 7. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations “Not Applicable.” 8. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): “Not Applicable.” 2. Procurement Plan for the project duration Start Comp-onent Contract title, Estimat Bank Procurem Selecti Evaluation date Description and ed cost over ent on method: s(Pre Category (US$) sight approach metho limin / ds ary): Competiti on Goods &NCS Equipment in support of plant breeding and variety evaluation programs including irrigation Substantially equipment, farming machinery for the responsive and C1 Tajik Academy of Agricultural 470,000.00 Post National, Open RFB 2023 lowest evaluated Sciences (TAAS) institutes: Pamir cost Institute, Institute of Horticulture, Viticulture and Vegetable Growing, Farming Institute Equipment in support of the storage and maintenance of germplasm Substantially including freezers for long-term responsive and C1 germplasm storage, irrigation 80,000.00 Post National, Open RFQ 2023 lowest evaluated equipment, farm machinery for cost National Republican Center for Genetic Resources C1 Equipment in support of plant 100,000.00 Post National, Open RFQ Substantially 2023 breeding and variety evaluation responsive and programs including irrigation lowest evaluated equipment, farming machinery for cost Center for Innovation and Mechanization of Agriculture Equipment in support of plant breeding, in vitro laboratory Substantially equipment, irrigation equipment, responsive and C1 680,000.00 Post National, Open RFB 2023 farming machinery for Scientific lowest evaluated Research Institute of Biotechnology cost of Tajik Agrarian University (TAU) Equipment in support of seed, seedling and planting material propagation, including cleaning, Substantially processing, packaging, quality responsive and C1 780,000.00 Post National, Open RFB 2023 monitoring for institutes of the TAAS: lowest evaluated Pamir Institute, Institute of cost Horticulture, Viticulture and Vegetable Growing, Farming Institute Equipment in support of seed, seedling and planting material quality control including laboratory Substantially equipment, field and greenhouse responsive and C1 equipment and field equipment for 280,000.00 Post National, Open RFB 2023 lowest evaluated use in surveillance of material cost produced in the field and sold into the market for Central Seed Laboratory of TAAS Equipment in support of seed, seedling and planting material quality control including laboratory Substantially equipment, field and greenhouse responsive and C1 equipment and field equipment for 540,000.00 Post National, Open RFB 2022 lowest evaluated use in surveillance of material cost produced in the field and sold into the market for Regional Quality Control Facilities Office and IT equipment for TAAS institutes: Pamir Institute, Institute of Horticulture, Viticulture and Vegetable Growing, Farming Substantially Institute, National Republican Center responsive and C1 430,000.00 Post National, Open RFB 2023 for Genetic Resources, Center for lowest evaluated Innovation and Mechanization of cost Agriculture, Central Seed Laboratory of TAAS, Regional Quality Control Facilities Procurement of cotton seeds of the Substantially elite and super elite categories for Prior International, responsive and C1 5,200,000.00 RFB 2022 production of categories and for Open lowest evaluated reproduction in seed farms cost Procurement of potato seeds of the Substantially elite and super elite categories for Prior International, responsive and C1 5,200,000.00 RFB 2022 production of categories and for Open lowest evaluated reproduction in seed farms cost Procurement of wheat seeds of the Substantially elite and super elite categories for Prior International, responsive and C1 5,155,000.00 RFB 2022 production of categories and for Open lowest evaluated reproduction in seed farms cost Procurement of corn seeds of the Substantially elite and super elite categories for International, responsive and C1 200,000 Post RFB 2022 production of categories and for Open lowest evaluated reproduction in seed farms cost Substantially Equipment (Pre-cooling, sorting, International, responsive and C2 grading, packing lines, cold storage) 1,280,000.00 Post RFB 2023 Open lowest evaluated for ALCs cost Substantially ALCs Operational Management responsive and C2 99,000.00 Post National, Open RFQ 2023 software lowest evaluated cost Purchase of satellite images for soil Substantially remote sensing responsive and C3 250,000.00 Post National, Open RFB 2022 lowest evaluated cost Digital data processing, creation of Substantially agricultural and thematic maps for responsive and C3 633,000.00 Post National, Open RFB 2023 forecasting lowest evaluated cost C3 Equipment for Data Center for MOA 150,000.00 Post National, Open RFB Substantially 2023 (Digital archive SDW) responsive and lowest evaluated cost Software (GIS Server, 3D GIS, GIS and Substantially 3 D GIS editing tools, SUBDD) responsive and C3 200,000.00 Post National, Open RFB 2023 lowest evaluated cost Hardware (Server, Web APP, storage, Substantially Plotter, Scanner, Printers, Notebooks, responsive and C3 450,000.00 Post National, Open RFB 2022 Displays, switchers, brandmauer, lowest evaluated network equipment, computers) cost Drones for aero photography and Substantially monitoring responsive and C3 200,000.00 Post National, Open RFB 2022 lowest evaluated cost Diesel generator (1) Substantially responsive and C3 20,000.00 Post National, Open RFQ 2022 lowest evaluated cost Mobile agrometeorological stations Substantially (12) responsive and C3 60,000.00 Post National, Open RFQ 2022 lowest evaluated cost Equipment for MOA to support Substantially monitoring and planning of responsive and C3 500,000.00 Post National, Open RFB 2022 agriculture lowest evaluated cost Office and computer equipment for Substantially TAAS and TAU responsive and C3 200,000.00 Post National, Open RFB 2023 lowest evaluated cost Vehicles (5 for PMU AED, 6 for Center Substantially for Digital Development of responsive and C3 Agriculture (1), for Soil Management 401,550.00 Post National, Open RFB 2022 lowest evaluated Research Institute (1), for Crop cost Protection Unit (1) for Agrokhims (3)) Laboratory equipment for Agrokhim Substantially soil laboratories: (3), Laboratory responsive and C3 equipment, Mobile soil testing 1,010,000.00 Post National, Open RFB 2023 lowest evaluated laboratory (2), Soil Doctor kits for Soil cost Management Research Institute Laboratory materials for Agrokhim Substantially soil laboratories, Soil Management responsive and C3 430,000.00 Post National, Open RFB 2023 Research Institute, and Crop lowest evaluated Protection Unit cost Equipment for Technical Substantially modernization of Agrokhim soil responsive and C3 400,000.00 Post National, Open RFB 2022 laboratories (Establishment of digital lowest evaluated soil testing database) cost Office &IT equipment for Crop Substantially Protection Unit responsive and C3 200,000.00 Post National, Open RFB 2023 lowest evaluated cost Equipment for Crop protection Substantially laboratories in 4 regions and Special International, responsive and C3 1,600,000.00 Post RFB 2022 safety equipment/tools for Crop Open lowest evaluated Protection Unit cost Import of plant protection products Substantially for control and prevention of diseases responsive and C3 200,000.00 Post National, Open RFB 2022 lowest evaluated cost Equipment for mechanical and Substantially manual control of locust, equipment responsive and C3 800,000.00 Post National, Open RFB 2022 and tools for staff engaged in locust lowest evaluated control cost Chemicals for locust control Substantially responsive and C3 1,050,000.00 Post National, Open RFB 2022 lowest evaluated cost Utilization of remaining chemicals Substantially and materials responsive and C3 60,000.00 Post National, Open RFQ 2022 lowest evaluated cost Substantially Office Equipment and furniture (for responsive and C4 133,850.00 Post National, Open RFB 2022 PMU AED & two regional offices) lowest evaluated cost TBA 1,886,600.00 31,329,000. Sub-Total 00 Works Renovation/construction of buildings, structures and facilities in support of plant breeding and variety evaluation Substantially programs, storage facilities, and responsive and C1 660,000.00 Post National, Open RFB 2022 greenhouses of institutes of the lowest evaluated TAAS: Pamir Institute, Institute of cost Horticulture, Viticulture and Vegetable Growing, Farming Institute Renovation/construction of buildings, structures and facilities in support of Substantially the storage and maintenance of responsive and C1 germplasm including specialized seed 210,000.00 Post National, Open RFB 2022 lowest evaluated room and greenhouse for germplasm cost maintenance of National Republican Center for Genetic Resources Renovation/construction of buildings, structures and facilities in support of Substantially plant breeding and variety evaluation responsive and C1 40,000.00 Post National, Open RFQ 2022 programs including storage facilities lowest evaluated of Center for Innovation and cost Mechanization of Agriculture Renovation/construction of buildings, structures and facilities in support of Substantially plant breeding and variety evaluation responsive and C1 930,000.00 Post National, Open RFB 2022 programs including storage facilities lowest evaluated of Center for Innovation and cost Mechanization of Agriculture Renovation/construction of buildings, structures and facilities in support of seed, seedling and plant material multiplication including for cleaning, Substantially processing, packaging and storage, responsive and C1 including upgrade of existing facilities 600,00.00 Post National, Open RFB 2022 lowest evaluated in addition to the construction of cold cost storage facilities of institutes of the TAAS: Pamir Institute, Institute of Horticulture, Viticulture and Vegetable Growing, Farming Institute Renovation/construction of buildings, Substantially structures and facilities in support of responsive and C1 350,000.00 Post National, Open RFB 2022 seed, seedling and plant material lowest evaluated quality control. cost Construction of Regional Quality Substantially Control Facilities (3) responsive and C1 1,300,000.00 Post National, Open RFB 2022 lowest evaluated cost Construction of ALC near Dushanbe Substantially responsive and C2 4,700,000.00 Post National, Open RFB 2023 lowest evaluated cost Construction of ALC in Khatlon Substantially responsive and C2 4,600,000.00 Post National, Open RFB 2023 lowest evaluated cost Construction of ALC in Sughd Substantially responsive and C2 4,700,000.00 Post National, Open RFB 2023 lowest evaluated cost Renovation of the Center for Digital Substantially Development of Agriculture responsive and C3 400,000.00 Post National, Open RFB 2022 lowest evaluated cost Repair of Agrokhim soil laboratories Substantially (3) responsive and C3 300,000.00 Post National, Open RFB 2023 lowest evaluated cost Repair of building of Soil Substantially Management Research Institute responsive and C3 100,000.00 Post National, Open RFQ 2023 lowest evaluated cost Repair of buildings of the crop Substantially protection unit responsive and C3 125,000.00 Post National, Open RFQ 2023 lowest evaluated cost Substantially Renovation of AED PMU office responsive and C4 20,000.00 Post National, Open RFQ 2022 lowest evaluated cost TBA 89,000.00 19,124,000. Sub-Total 00 Consultants Technical support and capacity Based on C1 building on plant breeding, crop 72,000.00 Post National, Open CQS 2023 qualification propagation, plant diseases, irrigation Strategic contract covering the following areas: (i) support for improving seed policies and legislation; (ii) update the seed quality standards, aligning them with international standards; (iii) training MOA and Food Security Committee staff on seed quality assurance; (iv) support to introduce best practices for multiplication of seed, seedling and planting material on seed farms and nurseries; (v) supervision and monitoring of seed production on seed multiplication farms; (vi) awareness raising campaign with farmers on improved seeds; (vi) design and establishment of the C1 database for real-time agricultural 2,500,000.00 Prior Direct (UNFAO) DS Direct Selection 2023 sector monitoring and agricultural production forecasting; (vii) development of information products using agrometeorological information and development of mechanisms to disseminate it to farmers; (viii) supporting the improvement of quality of soil tests, preparation of agro-technological maps, and methodologies for testing various soil types; (ix) capacity building on crop protection and locust control; and (x) preparation of technical specifications for specialized equipment on seeds, real-time monitoring, soil testing, and crop protection. Needs assessment for renovation work and development of design and detailed cost estimates: Based on C1 170,000.00 Post National, Open CQS 2022 1. Research institutes of TAAS qualification 2. TAU 3. Centers and agencies of the MoA Preparation of the list and technical specifications of equipment for technical modernization: Based on C1 70,000.00 Post National, Open CQS 2022 1. Research institutes of TAAS qualification 2. TAU 3. Centers and agencies of the MoA Feasibility study - business plan - Based on C2 213,000.00 Post National, Open CQS 2022 ESIA / qualification Detailed design/cost estimate for International, Based on C2 489,000.00 Post QCBS 2022 three ALCs and supervision of works Open qualification On-site specialized training of the Based on C2 104,000.00 Post National, Open CQS 2025 staff operating the ALCs qualification Lawyer to prepare documents on legal changes of the SOE "Center for Individual C3 Staff Capacity Building" under MOA 10,000.00 Post National, Open IC 2022 Consultant into the Center for Digital Development of Agriculture C3 Forecasting the yield of agricultural 750,000.00 Post International, QCBS Most 2022 production through the introduction Open advantageous of digital technologies Proposal Detailed design of the Center for Based on C3 300,000.00 Post National, Open CQS 2022 Digital Development of Agriculture qualification Baseline study of the project Based on C4 90,000.00 Post National, Open CQS 2022 qualification Mid-term review Based on C4 70,000.00 Post National, Open CQS 2024 qualification Final review Based on C4 60,000.00 Post National, Open CQS 2027 qualification Grievance Redress Mechanism Based on C4 90,000.00 Post National, Open CQS 2022 qualification International Audit (Block audit. To be International, Based on the C4 conducted by State Investment 66,000.00 Post LCS 2023 Open lowest cost Committee) Individual Consultants 46,000.00 Sub-Total 5,100,000.0 0 Total 55,553,000. 00 PROCUREMENT Tajikistan : Strengthening Resilience of the Agriculture Sector Project PLAN General Information Country: Tajikistan Bank’s Approval Date of the Original Procurement Plan: 2022-02-24 Revised Plan Date(s): (comma delineated, leave blank if 2023-05-22 none) Project ID: P175952 GPN Date: Project Name: Strengthening Resilience of the Agriculture Sector Project Loan / Credit No: IDA / D8600, IDA / E1450 Project Implementation Unit under the Ministry of Agriculture of the Republic of Tajikistan Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure TJ-SRASP-RFB-CW02 / Renov Strengthening seed, seedlin ment Document - ation/construction of building Pending Imp 2023-11-1 IDA / D8600 g and planting material syst Post Request for Bids 1 Envelope proce 210,000.00 0.00 2022-07-21 2022-07-26 2022-09-06 2022-10-06 2022-11-10 s, structures of National Rep lementation 6 ems ss (Non Bank-SPD ublican Center for Genetic Re ) sources TJ-SRASP-RFB-CW03 / Renov National Procure ation/construction of building Strengthening seed, seedlin ment Document - Single Stage - One E Pending Imp 2024-02-0 s, structures of Tajik Agrarian IDA / D8600 g and planting material syst Post Request for Bids Open - National 1 Envelope proce 930,000.00 0.00 2022-09-10 2022-09-10 2022-10-22 2022-11-21 2022-11-27 nvelope lementation 9 University, Scientific Researc ems ss (Non Bank-SPD h Institute of Biotechnology ) National Procure TJ-SRASP-RFB-CW06 / Constr Strengthening seed, seedlin ment Document - Single Stage - One E Pending Imp 2023-07-0 uction Regional Quality Contr IDA / D8600 g and planting material syst Post Request for Bids Open - National 1 Envelope proce 1,300,000.00 0.00 2022-10-22 2022-10-22 2022-11-22 2022-12-22 2023-01-03 nvelope lementation 2 ol Facilities (3) ems ss (Non Bank-SPD ) TJ-SRASP-RFQ-CW02 / Repair Strengthen public capacity f Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-01-2 of building of Soil Manageme IDA / D8600 or crises prevention and ma Post Open - National tions (Non Bank-S 100,000.00 0.00 2023-03-13 2023-05-02 tions nvelope lementation 7 nt Research Institute nagement PD) Request for Quota TJ-SRASP-RFQ-CW03 / Repair Strengthen public capacity f Request for Quota Single Stage - One E Pending Imp 2023-11-2 IDA / D8600 Post Open - National tions (Non Bank-S 125,000.00 0.00 2023-04-05 2023-05-30 of buildings of the crop prote or crises prevention and ma tions nvelope lementation 6 PD) ction unit nagement Request for Quota TJ-AED PIU-303693-CW-RFQ Strengthen public capacity f Request for Quota Single Stage - One E Under Imple 2022-11-0 IDA / D8600 Post Open - National tions (Non Bank-S 96,000.00 0.00 2022-08-28 2022-10-02 / Construction of "Garden of or crises prevention and ma tions nvelope mentation 1 PD) Friendship" nagement TJ-SRASP-RFB-CW04 / Renov National Procure ation/construction of building Strengthening seed, seedlin ment Document - s, structures including upgr Single Stage - One E Pending Imp 2024-04-0 IDA / D8600 g and planting material syst Post Request for Bids Open - National 1 Envelope proce 600,000.00 0.00 2022-10-21 2022-10-21 2022-11-20 2022-12-04 2023-01-08 ade of existing facilities in ad nvelope lementation 2 ems ss (Non Bank-SPD dition to the construction of c ) old storage facilities of institu tes of the TAAS National Procure TJ-SRASP-RFB-CW11 / Repair Strengthen public capacity f Single Stage - One E ment Document - Pending Imp 2024-02-1 e of Agrokhim soil laboratorie IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 300,000.00 0.00 2023-05-30 2023-06-04 2023-07-04 2023-08-03 2023-08-17 nvelope 1 Envelope proce lementation 3 s (3) nagement ss (Non Bank-SPD ) TJ-SRASP-RFQ-CW01 / Renov Strengthening seed, seedlin Request for Quota ation/construction of building Request for Quota Single Stage - One E Pending Imp 2023-09-2 IDA / D8600 g and planting material syst Post Open - National tions (Non Bank-S 40,000.00 0.00 2023-05-20 2023-07-01 s, structures of Center for Inn tions nvelope lementation 9 ems PD) ovation and Mechanization of Agriculture National Procure TJ-SRASP-RFB-CW09 / Constr Support investments in Agri- ment Document - Single Stage - One E Pending Imp 2024-01-1 uction of agro-logistics cente IDA / D8600 Logistical Centers (ALCs) for Post Request for Bids Open - National 1 Envelope proce 3,770,000.00 0.00 2023-03-31 2023-04-05 2023-05-17 2023-06-16 2023-07-21 nvelope lementation 7 r in Sughd horticulture value chains ss (Non Bank-SPD ) National Procure TJ-SRASP-RFB-CW10 / Renov Strengthen public capacity f ment Document - Single Stage - One E Pending Imp 2023-11-0 ation of the Center for Digital IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 1 Envelope proce 400,000.00 0.00 2023-05-10 2023-05-15 2023-06-14 2023-07-14 2023-08-04 nvelope lementation 2 Development of Agriculture nagement ss (Non Bank-SPD ) TJ-SRASP-RFB-CW05 / Renov National Procure ation/construction of building Strengthening seed, seedlin ment Document - Single Stage - One E Pending Imp 2023-04-0 s, structures and facilities in IDA / D8600 g and planting material syst Post Request for Bids Open - National 1 Envelope proce 350,000.00 0.00 2022-06-20 2022-06-25 2022-08-06 2022-09-05 2022-10-10 nvelope lementation 8 support of seed, seedling and ems ss (Non Bank-SPD plant material quality control ) . National Procure TJ-SRASP-RFB-CW08 / Constr Support investments in Agri- ment Document - Single Stage - One E Pending Imp 2023-11-1 uction of agro-logistics cente IDA / D8600 Logistical Centers (ALCs) for Post Request for Bids Open - National 1 Envelope proce 3,770,000.00 0.00 2023-01-31 2023-02-05 2023-03-19 2023-04-18 2023-05-23 nvelope lementation 9 r in Khatlon horticulture value chains ss (Non Bank-SPD ) National Procure TJ-SRASP-RFB-CW01 / Recon Strengthening seed, seedlin ment Document - struction / construction of str Single Stage - One E Pending Imp 2024-02-1 IDA / D8600 g and planting material syst Post Request for Bids Open - National 1 Envelope proce 660,000.00 0.00 2023-05-19 2023-05-24 2023-07-05 2023-08-04 2023-08-18 uctures, institutes of the Taji nvelope lementation 4 ems ss (Non Bank-SPD k Academy of Agricultural Sci ) ences (TAAS) . National Procure TJ-SRASP-RFB-CW07 / Constr Support investments in Agri- ment Document - Single Stage - One E Pending Imp 2024-05-0 uction of agro-logistics cente IDA / D8600 Logistical Centers (ALCs) for Post Request for Bids Open - National 1 Envelope proce 3,841,000.00 0.00 2023-07-21 2023-07-26 2023-09-06 2023-10-06 2023-11-10 nvelope lementation 8 r near Dushanbe horticulture value chains ss (Non Bank-SPD ) TJ-AED PIU-358146-CW-RFB / National Procure Construction of overhaul war Strengthening seed, seedlin ment Document - Single Stage - One E Under Imple 2023-12-2 ehouses and renovation of b IDA / D8600 g and planting material syst Post Request for Bids Open - National 1 Envelope proce 990,000.00 0.00 2023-06-12 2023-05-19 2023-06-17 2023-05-20 2023-07-29 2023-08-28 2023-09-25 nvelope mentation 4 uildings for project beneficiar ems ss (Non Bank-SPD ies (research institutions und ) er TAAS and MoA) Request for Quota TJ-SRASP-RFQ-CW04 / Renov Project management and co Request for Quota Single Stage - One E Pending Imp 2023-09-2 IDA / D8600 Post Open - National tions (Non Bank-S 20,000.00 0.00 2023-06-10 2023-07-30 ation of SRASP PMU office ordination tions nvelope lementation 9 PD) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TJ-SRASP-PIU-RFB-01 / Procu rement of cotton seeds of th Strengthening seed, seedlin Single Stage - One E e Flesh, Karisma and BA 440 IDA / D8600 g and planting material syst Post Request for Bids Open - National 400,000.00 0.00 Canceled 2022-02-04 2022-02-04 2022-02-09 2022-03-18 2022-02-18 2022-03-22 2022-04-26 2022-05-23 nvelope for production of categories a ems nd for reproduction in seed f arms TJ-SRASP-RFQ-G03 / ALCs Op Support investments in Agri- Request for Quota Single Stage - One E Pending Impl erational Management softw IDA / D8600 Logistical Centers (ALCs) for Post Open - National 99,000.00 0.00 2023-11-05 2023-12-31 2024-06-28 tions nvelope ementation are horticulture value chains Page 1 TJ-SRASP-RFQ-G04 / Diesel g Strengthen public capacity f Request for Quota Single Stage - One E Pending Impl IDA / D8600 Post Open - National 20,000.00 0.00 2022-07-16 2022-09-10 2023-01-08 enerator (1) or crises prevention and ma tions nvelope ementation nagement TJ-SRASP-RFB-G22 / Labotar atory materials for Agrokhim Strengthen public capacity f Single Stage - One E Pending Impl soil laboratories, for Soil Man IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 430,000.00 0.00 2023-07-31 2023-08-05 2023-09-16 2023-10-16 2023-11-20 2024-05-18 nvelope ementation agement Research Institute, nagement and for Crop Protection Unit TJ-SRASP-PIU-RFB-02 / Procu rement of potato seeds of th Strengthening seed, seedlin Single Stage - One E e Romance, Bigroza and Cro IDA / D8600 g and planting material syst Post Request for Bids Open - National 560,000.00 540,880.00 Signed 2022-02-04 2022-02-04 2022-02-09 2022-02-18 2022-02-18 2022-02-25 2022-03-15 2022-03-07 2022-04-15 2022-04-05 nvelope ne for production of categori ems es and for reproduction in se ed farms TJ-SRASP-RFB-G02 / Equipm ent in support of plant breedi ng, in vitro laboratory equip Strengthening seed, seedlin Single Stage - One E Pending Impl ment, irrigation equipment, f IDA / D8600 g and planting material syst Post Request for Bids Open - National 680,000.00 0.00 2023-05-31 2023-05-31 2023-06-30 2023-07-30 2023-08-10 2024-02-06 nvelope ementation arming machinery for Scienti ems fic Research Institute of Biote chnology of Tajik Agrarian Un iversity TJ-SRASP-RFB-G14 / Equipm Strengthen public capacity f Single Stage - One E Pending Impl ent for Data Center for MOA ( IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 150,000.00 0.00 2023-06-22 2023-06-22 2023-07-22 2023-08-21 2023-09-25 2024-03-23 nvelope ementation Digital archive SDW) nagement TJ-SRASP-RFB-G15 / Softwar Strengthen public capacity f Single Stage - One E Pending Impl es (GIS Server, 3D GIS, GIS a IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 200,000.00 0.00 2023-06-22 2023-06-27 2023-07-27 2023-08-26 2023-09-07 2024-03-05 nvelope ementation nd 3 D GIS editing tools, SUB nagement DD) TJ-SRASP-RFB-G17 / Drones f Strengthen public capacity f Single Stage - One E Pending Impl IDA / D8600 Post Request for Bids Open - National 200,000.00 0.00 2022-07-16 2022-07-16 2022-08-15 2022-09-14 2022-09-26 2023-03-25 or aerophotography and mon or crises prevention and ma nvelope ementation itoring nagement TJ-SRASP-RFQ-G05 / Mobile a Strengthen public capacity f Request for Quota Single Stage - One E Pending Impl IDA / D8600 Post Open - National 60,000.00 0.00 2022-07-16 2022-08-21 2023-02-17 grometeorological stations (1 or crises prevention and ma tions nvelope ementation 2) nagement TJ-SRASP-RFB-G24 / Office a Strengthen public capacity f Single Stage - One E Pending Impl IDA / D8600 Post Request for Bids Open - National 200,000.00 0.00 2023-02-07 2023-02-12 2023-03-26 2023-04-25 2023-05-30 2024-05-29 nd IT for Crop Protection Unit or crises prevention and ma nvelope ementation nagement TJ-SRASP-RFB-G20 / Procure Project management and co Single Stage - One E IDA / D8600 Post Request for Bids Open - National 254,460.00 249,600.00 Completed 2022-04-28 2022-04-28 2022-05-03 2022-04-29 2022-06-14 2022-05-31 2022-07-14 2022-06-10 2022-08-18 2022-07-14 2022-08-27 2023-01-10 ment of 8 vehicles for AED P ordination nvelope MU TJ-AED PIU-291011-GO-RFB / Strengthen public capacity f Single Stage - One E IDA / D8600 Post Request for Bids Open - National 240,000.00 0.00 Completed 2022-08-01 2022-07-25 2022-08-06 2022-07-26 2022-09-17 2022-08-26 2022-10-17 2022-09-14 2022-11-21 2023-05-20 2022-12-27 Procurement of 6 Field cars. or crises prevention and ma nvelope nagement TJ-SRASP-RFB-G29 / Office E quipment and Office Furnitur Project management and co Single Stage - One E IDA / D8600 Post Request for Bids Open - National 133,850.00 0.00 Canceled 2022-02-28 2022-03-05 2022-04-16 2022-05-16 2022-06-20 2022-12-17 e (for PMU & two regional off ordination nvelope ices in North and South) TJ-SRASP-295742-GO-RFQ / Project management and co Request for Quota Single Stage - One E Procurement of office equip IDA / D8600 Post Open - National 80,000.00 79,340.00 Completed 2022-06-06 2022-06-06 2022-07-16 2022-07-17 2022-10-14 2022-09-20 ordination tions nvelope ment for PMU AED & two regi onal offices TJ-SRASP-296890-GO-RFB / P Strengthening seed, seedlin Single Stage - One E rocurement of cotton seeds o IDA / D8600 g and planting material syst Post Request for Bids Open - National 900,000.00 0.00 Canceled 2022-08-01 2022-07-22 2022-08-06 2022-07-22 2022-09-05 2022-08-24 2022-10-05 2022-10-20 2022-10-26 2023-01-24 nvelope f the elite and super elite cat ems egories TJ-SRASP-296894-GO-RFB / P Strengthening seed, seedlin Single Stage - One E rocurement of potato seeds o IDA / D8600 g and planting material syst Post Request for Bids Open - National 800,000.00 0.00 Canceled 2022-09-05 2022-08-19 2022-09-10 2022-08-19 2022-09-13 2022-09-19 2022-10-13 2022-10-17 2022-11-17 2023-02-15 nvelope f the elite and super elite cat ems egories TJ-SRASP- 96900-GO-RFB / P Strengthening seed, seedlin rocurement of wheat seeds o Single Stage - One E IDA / D8600 g and planting material syst Post Request for Bids Open - National 700,000.00 713,212.50 Completed 2022-06-08 2022-06-03 2022-06-13 2022-06-03 2022-07-13 2022-07-05 2022-07-27 2022-07-12 2022-08-02 2022-08-08 2022-09-01 2022-09-28 f the elite and super elite cat nvelope ems egories and fertilizers TJ-SRASP-RFB-G21 / Laborat ory equipment for Agrokhim Strengthen public capacity f Single Stage - One E Pending Impl soil laboratories: (3), Laborat IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 810,000.00 0.00 2023-08-08 2023-08-13 2023-09-24 2023-10-24 2023-11-28 2024-05-26 nvelope ementation ory equipment, Soil Doctor ki nagement ts for Soil Management Rese arch Institute TJ-SRASP-300076-GO-RFB / P Strengthen public capacity f Single Stage - One E Under Imple rocurement of two (2) mobile IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 200,000.00 0.00 2022-06-23 2022-07-22 2022-06-28 2022-07-22 2022-07-28 2022-08-27 2022-08-31 2022-11-29 nvelope mentation soil testing laboratories nagement TJ-AED PIU-304795-GO-RFQ / Project management and co Request for Quota Single Stage - One E Under Imple Supply and installation of 1C IDA / D8600 Post Open - National 15,000.00 0.00 2022-07-26 2022-08-13 2022-09-12 ordination tions nvelope mentation Accounting Software TJ-SRASP-307221-GO-RFB / P rocurement of seeds, seedlin Strengthening seed, seedlin Single Stage - One E Under Imple gs and planting material to cr IDA / D8600 g and planting material syst Post Request for Bids Open - National 150,000.00 0.00 2022-08-08 2022-08-12 2022-08-10 2022-08-15 2022-09-09 2022-10-09 2022-10-16 2022-11-15 nvelope mentation eate intensive gardens for SU ems E “Tojikniholparvar” for 2022 . TJ-SRASP-307269-GO-RFB / P Strengthen public capacity f Single Stage - One E rocurement of means and ch IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 400,000.00 0.00 Signed 2022-08-08 2022-08-12 2022-08-13 2022-08-15 2022-09-12 2022-09-08 2022-10-12 2022-09-30 2022-10-21 2023-01-19 nvelope emicals for locust control for nagement 2022 TJ-SRASP-307211-GO-RFB / P Strengthening seed, seedlin Open - Internationa Single Stage - One E rocurement of fertilisers for c IDA / D8600 g and planting material syst Post Request for Bids 2,700,000.00 0.00 Signed 2022-08-15 2022-08-19 2022-08-20 2022-08-19 2022-09-19 2022-09-19 2022-10-19 2022-10-02 2022-11-23 2023-02-21 l nvelope otton seeds and potato seeds ems TJ-SRASP-RFB-G07 / Procure Strengthening seed, seedlin Open - Internationa Single Stage - One E ment of cotton seeds of the e IDA / D8600 g and planting material syst Post Request for Bids 1,750,000.00 0.00 Signed 2022-08-22 2022-08-29 2022-08-27 2022-09-27 2022-10-08 2022-10-10 2022-11-07 2022-10-21 2022-12-12 2023-06-10 l nvelope lite and super elite categorie ems s and fertilizers TJ-SRASP-RFB-G18 / Equipm Strengthen public capacity f Single Stage - One E Under Imple ent for MOA to support monit IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 350,000.00 0.00 2022-09-22 2022-12-01 2022-09-27 2022-12-01 2022-10-27 2022-12-30 2022-11-26 2022-12-08 2023-04-07 nvelope mentation oring and planning of agricult nagement ure TJ-SRASP-331090-GO-RFB / P Strengthening seed, seedlin Open - Internationa Single Stage - One E rocurement of cotton seeds o IDA / D8600 g and planting material syst Post Request for Bids 900,000.00 0.00 Completed 2022-12-14 2022-12-14 2022-12-19 2022-12-15 2023-01-30 2023-01-13 2023-03-01 2023-01-19 2023-03-13 2023-04-12 2023-04-03 l nvelope f elite and super elite categor ems ies Page 2 TJ-AED PIU-332924-GO-RFB / Procurement of tractors and Strengthening seed, seedlin Open - Internationa Single Stage - One E agricultural equipment for St IDA / D8600 g and planting material syst Post Request for Bids 2,700,000.00 0.00 Signed 2022-12-30 2022-12-30 2023-01-04 2022-12-29 2023-01-14 2023-02-08 2023-02-03 2023-03-20 2023-03-06 2023-07-04 l nvelope ate Unitary Republican Enter ems prise “Tojikniholparvar” and seed production farms TJ-AED PIU-336407-GO-RFB / Strengthening seed, seedlin Single Stage - One E Procurement of potato seeds IDA / D8600 g and planting material syst Post Request for Bids Open - National 950,000.00 0.00 Completed 2023-01-17 2023-01-18 2023-01-18 2023-01-17 2023-02-08 2023-02-08 2023-02-13 2023-02-17 2023-02-24 2023-04-25 2023-05-03 nvelope of elite category for 2023 ems TJ-SRASP-RFB-G01 / Equipm ent in support of plant breedi Strengthening seed, seedlin ng and variety evaluation pro Single Stage - One E Pending Impl IDA / D8600 g and planting material syst Post Request for Bids Open - National 730,000.00 0.00 2023-01-31 2023-02-05 2023-03-19 2023-04-18 2023-04-28 2023-10-25 grams including irrigation eq nvelope ementation ems uipment, farming machinery for the Tajik Academy of Agri cultural Sciences (TAAS) insti tutes. TJ-SRASP-311034-GO-RFQ / Strengthening seed, seedlin Procurement of wheat, barle Request for Quota Single Stage - One E Pending Impl IDA / D8600 g and planting material syst Post Open - National 10,000.00 0.00 2023-09-06 2023-10-11 2023-11-10 y, cotton, corn, potato, alfalf tions nvelope ementation ems a, rape seeds of elite categor ies for seed farms TJ-SRASP-RFB-G10 / Procure ment of corn seeds of the elit Strengthening seed, seedlin Single Stage - One E Pending Impl e and super elite categories f IDA / D8600 g and planting material syst Post Request for Bids Open - National 190,000.00 0.00 2024-05-15 2024-05-20 2024-07-01 2024-07-31 2024-08-04 2024-09-03 nvelope ementation or the production of categori ems es and for reproduction in se ed farms TJ-SRASP-RFB-G08 / Procure ment of potato seeds of the e Strengthening seed, seedlin Open - Internationa Single Stage - One E Pending Impl lite and super elite categorie IDA / D8600 g and planting material syst Post Request for Bids 3,850,000.00 0.00 2023-12-01 2023-12-06 2024-01-05 2024-02-04 2024-02-08 2024-04-08 l nvelope ementation s for production of categories ems and for reproduction in seed farms TJ-SRASP-RFB-G28 / Procure Strengthen public capacity f Single Stage - One E Pending Impl ment of means and chemical IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 650,000.00 0.00 2023-05-30 2023-06-04 2023-07-04 2023-08-03 2023-08-31 2023-10-30 nvelope ementation s for locust control nagement TJ-SRASP-RFB-G27 / Equipm Strengthen public capacity f ent for mechanical and manu Single Stage - One E Pending Impl IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 800,000.00 0.00 2023-06-30 2023-06-30 2023-07-30 2023-08-29 2023-09-17 2023-09-23 al control of locust, equipme nvelope ementation nagement nt and tools for staff engage d in locust control TJ-SRASP-RFB-G12 / Purchas Strengthen public capacity f Single Stage - One E Pending Impl e of satellite images for soil r IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 250,000.00 0.00 2023-07-10 2023-07-10 2023-08-09 2023-09-08 2023-09-21 2024-03-19 nvelope ementation emote sensing nagement TJ-SRASP-RFB-G16 / Hardwar e, (Server, Web APP, storage, Strengthen public capacity f Single Stage - One E Pending Impl Plotter, Scanner, Printers, No IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 450,000.00 0.00 2024-03-03 2024-03-08 2024-04-07 2024-05-07 2024-05-21 2024-11-17 nvelope ementation tebooks, Displays, switchers, nagement brandmauer, network equip ment, computers) TJ-SRASP-RFB-G11 / Equipm ent (Pre-cooling, sorting, gra Support investments in Agri- Open - Internationa Single Stage - One E Pending Impl ding, packing lines, cold stor IDA / D8600 Logistical Centers (ALCs) for Post Request for Bids 1,280,000.00 0.00 2024-05-10 2024-05-15 2024-06-26 2024-07-26 2024-08-30 2025-02-26 l nvelope ementation age) for agro-logistics center horticulture value chains s in Dushanbe, Khatlon and Sughd TJ-SRASP-RFB-G23 / Equipm Strengthen public capacity f ent for Techjical modernizati Single Stage - One E Pending Impl IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 400,000.00 0.00 2023-07-03 2023-07-08 2023-08-19 2023-09-18 2023-10-23 2024-04-20 on of Agrokhim soil laboratori nvelope ementation nagement es (Establishment of digital s oil testing database) TJ-SRASP-RFQ-G01 / Equipm ent in support of the storage and maintenance of germpla Strengthening seed, seedlin Request for Quota Single Stage - One E Pending Impl sm including freezers for lon IDA / D8600 g and planting material syst Post Open - National 200,000.00 0.00 2023-02-25 2023-04-22 2023-10-19 tions nvelope ementation g-term germplasm storage, ir ems rigation equipment, farm ma chinery for National Republic an Center for Genetic Resour ces TJ-SRASP-RFB-G26 / Procure Strengthen public capacity f ment of chemical means (pes Single Stage - One E Under Imple IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 200,000.00 0.00 2023-06-02 2023-05-19 2023-06-07 2023-05-20 2023-07-07 2023-06-16 2023-08-06 2023-08-20 2023-11-18 ticides) for SI “Plant protectio nvelope mentation nagement n and Agricultural Chemicals ” TJ-SRASP-RFB-G25 / Equipm Strengthen public capacity f Open - Internationa Single Stage - One E Pending Impl ent for Crop protection labor IDA / D8600 or crises prevention and ma Post Request for Bids 815,000.00 0.00 2022-04-05 2022-04-10 2022-05-22 2022-06-21 2022-07-26 2023-01-22 l nvelope ementation atories in 4 regions nagement TJ-SRASP-RFQ-G06 / Utilizati Strengthen public capacity f Request for Quota Single Stage - One E Pending Impl IDA / D8600 Post Open - National 60,000.00 0.00 2024-07-15 2024-08-29 2025-02-25 on of remaining chemicals an or crises prevention and ma tions nvelope ementation d materials nagement TJ-SRASP-RFB-G03 / Equipm ent in support of seed, seedli Strengthening seed, seedlin ng and planting material pro Single Stage - One E IDA / D8600 g and planting material syst Post Request for Bids Open - National 780,000.00 0.00 Canceled 2023-12-22 2023-12-27 2024-02-07 2024-03-08 2024-04-12 2024-10-09 pagation, including cleaning, nvelope ems processing, packaging, qualit y monitoring for institutes of the TAAS TJ-SRASP-357808-GO-RFB / P Strengthen public capacity f Single Stage - One E Under Imple rocurement of sprayers for SI IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 300,000.00 0.00 2023-05-10 2023-05-19 2023-05-15 2023-05-22 2023-06-14 2023-06-16 2023-07-14 2023-08-04 2023-10-03 nvelope mentation “Plant protection and Agricult nagement ural Chemicals” TJ-SRASP-RFB-G002 / Equip ment in support of plant bree Strengthening seed, seedlin ding and variety evaluation p Request for Quota Single Stage - One E Pending Impl IDA / D8600 g and planting material syst Post Open - National 230,000.00 0.00 2022-12-21 2023-02-06 2023-08-05 rograms including irrigation e tions nvelope ementation ems quipment, farming machiner y for Center for Innovation an d Mechanisation of Agricultur e TJ-SRASP-RFB-G05 / laborato ry and field Quality control a Strengthening seed, seedlin Single Stage - One E Pending Impl nd surveillance equipment fo IDA / D8600 g and planting material syst Post Request for Bids Open - National 820,000.00 0.00 2023-07-03 2023-07-10 2023-08-09 2023-09-08 2023-09-20 2024-01-18 nvelope ementation r Regional Quality Control Fa ems cilities and Central Seed Lab oratory TAAS TJ-SRASP-314986-GO-RFB / P Strengthen public capacity f rocurement of furniture for th Single Stage - One E Pending Impl IDA / D8600 or crises prevention and ma Post Request for Bids Open - National 190,000.00 0.00 2023-07-28 2023-08-02 2023-09-01 2023-10-01 2023-10-07 2024-01-05 e Ministry of Agriculture and nvelope ementation nagement PMU office and two regional offices Page 3 TJ-SRASP-RFB-G06 / Office a nd IT equipment for the Tajik Strengthening seed, seedlin Single Stage - One E Pending Impl Academy of Agricultural Scie IDA / D8600 g and planting material syst Post Request for Bids Open - National 240,000.00 0.00 2023-06-15 2023-06-15 2023-07-27 2023-08-26 2023-09-11 2023-12-10 nvelope ementation nces (TAAS) institutes and SI ems “Plant protection and Agricult ural Chemicals” TJ-SRASP-361656-GO-RFB / P Strengthening seed, seedlin Single Stage - One E Under Imple rocurement of wheat seeds o IDA / D8600 g and planting material syst Post Request for Bids Open - National 500,000.00 0.00 2023-05-18 2023-05-24 2023-05-23 2023-05-24 2023-06-22 2023-07-22 2023-07-31 2023-09-29 nvelope mentation f the elite and super elite cat ems egories TJ-SRASP-361657-GO-RFB / P Strengthening seed, seedlin Open - Internationa Single Stage - One E Under Imple rocurement of mineral fertiliz IDA / D8600 g and planting material syst Post Request for Bids 1,250,000.00 0.00 2023-05-23 2023-05-24 2023-05-28 2023-05-25 2023-07-09 2023-08-08 2023-08-22 2023-10-06 l nvelope mentation ers for wheat seeds ems TJ-SRASP-RFB-G09 / Procure ment of wheat seeds of the Strengthening seed, seedlin Single Stage - One E Pending Impl elite and super elite categori IDA / D8600 g and planting material syst Post Request for Bids Open - National 2,550,000.00 0.00 2022-03-28 2022-03-28 2022-04-27 2022-06-11 2022-07-16 2027-08-12 nvelope ementation es for the production of cate ems gories and for reproduction i n seed farms TJ-SRASP-358144-GO-RFB / P rocurement of tractors for SI “Plant protection and Agricult Strengthening seed, seedlin ural Chemicals” and SI "State Open - Internationa Single Stage - One E Pending Impl IDA / D8600 g and planting material syst Post Request for Bids 2,469,750.00 0.00 2023-06-01 2023-06-06 2023-07-18 2023-08-17 2023-09-07 2024-01-05 Commission for Variety Testi l nvelope ementation ems ng of Agricultural Crops and Protection of Varieties and tr actors and trailers for SUE “T ojikniholparvar” and seed pro duction farms" SRASP AF/G/RFB-2023/11 / P Project management and co Single Stage - One E Pending Impl IDA / E1450 Post Request for Bids Open - National 135,000.00 0.00 2023-06-30 2023-07-05 2023-08-04 2023-08-24 2023-09-09 2023-11-08 rocurement of vehicles for P ordination nvelope ementation MU SRASP AF/G/RFB-2023/09 / P Strengthening seed, seedlin rocurement of mineral fertiliz Single Stage - One E Pending Impl IDA / E1450 g and planting material syst Post Request for Bids Open - National 1,072,778.00 0.00 2023-07-10 2023-07-15 2023-08-14 2023-09-13 2023-09-29 2023-11-28 ers for pea and flax seeds for nvelope ementation ems vulnerable farmers SRASP AF/G/RFB-2023/01 / P Strengthening seed, seedlin Single Stage - One E Under Imple rocurement of wheat seeds f IDA / E1450 g and planting material syst Post Request for Bids Open - National 480,000.00 0.00 2023-06-05 2023-06-19 2023-06-10 2023-06-22 2023-07-10 2023-08-09 2023-08-25 2023-10-24 nvelope mentation or vulnerable farmers ems SRASP AF/G/RFB-2023/03 / P Strengthening seed, seedlin Single Stage - One E Under Imple rocurement of onion, tomato IDA / E1450 g and planting material syst Post Request for Bids Open - National 800,000.00 0.00 2023-06-05 2023-06-12 2023-06-10 2023-06-13 2023-07-10 2023-08-09 2023-08-25 2023-11-23 nvelope mentation and cucumber seeds for vuln ems erable farmers SRASP AF/G/RFB-2023/08 / P Strengthening seed, seedlin Open - Internationa Single Stage - One E Pending Impl rocurement of mineral fetiliz IDA / E1450 g and planting material syst Post Request for Bids 1,613,200.00 0.00 2023-06-27 2023-07-02 2023-08-13 2023-08-28 2023-09-13 2023-11-12 l nvelope ementation er for corn seeds for vulnera ems ble farmers SRASP AF/G/RFB-2023/04 / P Strengthening seed, seedlin Pending Impl rocurement of corn seeds for IDA / E1450 g and planting material syst Post Request for Bids 460,000.00 0.00 2023-06-19 2023-06-20 2023-07-20 2023-08-19 2023-09-04 2023-12-03 ementation vulnerable farmers ems SRASP AF/G/RFB-2023/07 / P Strengthening seed, seedlin rocurement of mineral fertiliz Single Stage - One E Under Imple IDA / E1450 g and planting material syst Post Request for Bids Open - National 436,000.00 0.00 2023-06-12 2023-06-16 2023-06-17 2023-06-16 2023-07-17 2023-08-16 2023-09-01 2023-10-31 ers for onion, tomato and cuc nvelope mentation ems umbers seeds for vulnerable farmers SRASP AF/G/RFB-2023/10 / P Strengthening seed, seedlin Open - Internationa Single Stage - One E Pending Impl rocurement of small agricultu IDA / E1450 g and planting material syst Post Request for Bids 3,500,000.00 0.00 2023-06-19 2023-06-24 2023-08-05 2023-08-25 2023-09-10 2023-12-09 l nvelope ementation ral machineries for vulnerabl ems e farmers SRASP AF/G/RFB-2023/02 / P Strengthening seed, seedlin Single Stage - One E Pending Impl rocurement of potato seeds f IDA / E1450 g and planting material syst Post Request for Bids Open - National 970,000.00 0.00 2023-06-05 2023-06-10 2023-07-10 2023-08-09 2023-08-25 2023-10-24 nvelope ementation or vulnerable farmers ems SRASP AF/G/RFB-2023/05 / P Strengthening seed, seedlin Pending Impl rocurement of pea and flax s IDA / E1450 g and planting material syst Post Request for Bids 550,180.00 0.00 2023-06-20 2023-06-25 2023-07-25 2023-08-24 2023-09-09 2023-11-08 ementation eeds for vulnerable farmers ems SRASP AF/G/RFB-2023/06 / P Strengthening seed, seedlin rocurement of mineral fertiliz Open - Internationa Single Stage - One E Pending Impl IDA / E1450 g and planting material syst Post Request for Bids 1,129,240.00 0.00 2023-06-09 2023-06-10 2023-07-10 2023-08-09 2023-08-25 2023-10-09 er for wheat and potato seed l nvelope ementation ems s for vulnerable farmers NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TJ-SRASP-CQS-CS05 / On-site Support investments in Agri- Consultant Qualifi Pending Impleme specialized training of the sta IDA / D8600 Logistical Centers (ALCs) for Post Open - National 104,000.00 0.00 2024-11-01 2024-11-22 2025-01-05 2025-02-04 2025-03-11 2025-09-07 cation Selection ntation ff operating the ALCs horticulture value chains TJ-SRASP-CQS-CS08 / Mid-ter Project management and co Consultant Qualifi Pending Impleme IDA / D8600 Post Open - National 70,000.00 0.00 2024-03-10 2024-03-31 2024-05-14 2024-06-13 2024-07-18 2025-01-14 m review ordination cation Selection ntation TJ-SRASP-CQS-CS09 / Final r Project management and co Consultant Qualifi Pending Impleme IDA / D8600 Post Open - National 60,000.00 0.00 2027-01-15 2027-02-05 2027-03-21 2027-04-20 2027-05-25 2027-11-21 eview ordination cation Selection ntation TJ-SRASP-CQS-CS10 / Grieva Project management and co Consultant Qualifi Under Implement IDA / D8600 Post Open - National 90,000.00 0.00 2022-03-15 2023-02-27 2022-04-05 2022-05-19 2022-06-18 2022-07-23 2023-01-19 nce Redress Mechanism ordination cation Selection ation TJ-SRASP-QCBS-CS01 / Feas Support investments in Agri- ability Study -business plan-E Quality And Cost- Open - Internationa Under Implement IDA / D8600 Logistical Centers (ALCs) for Post 702,000.00 0.00 2022-04-11 2022-04-08 2022-04-18 2022-05-19 2022-06-01 2022-07-28 2022-06-29 2022-07-29 2022-09-02 2022-10-07 2023-10-07 SIA/ Detailed design /cost est Based Selection l ation horticulture value chains imate for three ALCs and Sup ervision of works Page 4 TJ-SRASP-CQS-CS04 / Feasibi Support investments in Agri- Consultant Qualifi lity study - business plan - ES IDA / D8600 Logistical Centers (ALCs) for Post Open - National 213,000.00 0.00 Canceled 2022-03-10 2022-03-31 2022-05-14 2022-06-13 2022-07-18 2022-11-15 cation Selection IA horticulture value chains TJ-SRASP-CQS-CS07 / Baseli Project management and co Consultant Qualifi Under Implement IDA / D8600 Post Open - National 25,000.00 0.00 2022-07-01 2022-08-09 2022-07-06 2022-09-14 2022-08-19 2022-09-18 2022-10-23 2023-04-21 ne study of the project ordination cation Selection ation TJ-SRASP-CQS-CS02 / Need a ssessment of renovation wor k and for development of des Strengthening seed, seedlin ign and detailed cost estimat Consultant Qualifi IDA / D8600 g and planting material syst Post Open - National 170,000.00 0.00 Canceled 2022-04-22 2022-05-13 2022-06-26 2022-07-26 2022-08-30 2022-12-28 es cation Selection ems for Research institutes of TA AS, Tajik Agrarian University and Centers and agencies of the Ministry of Agriculture TJ-SRASP-296837-CS-CQS / P Strengthening seed, seedlin reparation of design and esti Consultant Qualifi Under Implement IDA / D8600 g and planting material syst Post Open - National 250,000.00 0.00 2022-08-22 2022-12-08 2022-09-05 2022-10-20 2022-11-03 2022-11-17 2023-05-16 mate documentation and sup cation Selection ation ems ervision of works for 7 sites. TJ-SRASP-296158-CS-CQS / P Strengthening seed, seedlin reparation of design and esti Consultant Qualifi Under Implement IDA / D8600 g and planting material syst Post Open - National 136,000.00 0.00 2022-07-20 2022-08-02 2022-08-03 2022-08-11 2022-08-19 2022-08-26 2022-09-09 2023-03-08 mate documentation and fiel cation Selection ation ems d supervision for 10 sites. TJ-SRASP-296164-CS-CQS / P Strengthening seed, seedlin reparation of design and esti Consultant Qualifi IDA / D8600 g and planting material syst Post Open - National 75,000.00 0.00 Signed 2022-05-31 2022-07-07 2022-06-10 2022-07-14 2022-07-08 2022-08-16 2022-07-15 2022-08-31 2022-07-29 2023-01-25 mate documentation and fiel cation Selection ems d supervision for 4 sites. TJ-SRASP-CQS-CS01 / Techni Strengthening seed, seedlin cal support and capacity buil Consultant Qualifi Pending Impleme IDA / D8600 g and planting material syst Post Open - National 72,000.00 0.00 2024-01-01 2024-01-01 2024-02-14 2024-02-28 2024-03-30 2024-08-08 ding on plant breeding, crop cation Selection ntation ems propagation, plant diseases, i rrigation TJ-SRASP-CQS-CS03 / Prepar ation of the list and technical specifications of equipment f Strengthening seed, seedlin Consultant Qualifi or technical modernization fo IDA / D8600 g and planting material syst Post Open - National 70,000.00 0.00 Canceled 2022-04-22 2022-05-13 2022-06-26 2022-07-26 2022-08-30 2022-12-28 cation Selection r Research institutes of TAAS ems , Tajik Agrarian University an d Centers and agencies of th e Ministry of Agriculture; SRASP AF/CS/CQS-2023/01 / Strengthening seed, seedlin Conduction of survey for iden Consultant Qualifi Pending Impleme IDA / E1450 g and planting material syst Post Open - National 200,000.00 0.00 2023-06-23 2023-07-07 2023-08-04 2023-08-05 2023-08-21 2023-10-20 tification of the availability of cation Selection ntation ems irrigation pumps of the vulne rable farmers TJ-SRASP-CQS-CS06 / Detaile Strengthen public capacity f Consultant Qualifi d design of the Center for Di IDA / D8600 or crises prevention and ma Post Open - National 300,000.00 0.00 Canceled 2022-05-20 2022-06-10 2022-07-24 2022-08-23 2022-09-27 2023-03-26 cation Selection gital Development of Agricult nagement ure TJ-SRASP-QCBS-CS02 / Devel Strengthen public capacity f Quality And Cost- Open - Internationa opment of Agriculture & Live IDA / D8600 or crises prevention and ma Post 3,400,000.00 0.00 Under Review 2023-06-20 2023-06-29 2023-07-11 2023-08-24 2023-09-21 2023-10-21 2023-11-25 2023-12-30 2024-12-29 Based Selection l stock Management Informati nagement on System INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TJ-SRASP-DS-CS01 / A strate gic contract covering all aspe cts of the project activities su Strengthening seed, seedlin Under Implement ch as. IDA / D8600 g and planting material syst Prior Direct Selection Direct 2,500,000.00 0.00 2022-02-28 2022-04-08 2022-03-10 2022-04-15 2022-04-23 2026-12-23 ation Component 1; including (Sub ems components 1.1- 1.4) Component 3: including (Sub -components 3.1-3.3) TJ-AED PIU-291019-CS-INDV Project management and co Individual Consult / Individual Consultant for Ba IDA / D8600 Post Open 40,000.00 36,918.00 Signed 2022-04-25 2022-04-25 2022-06-13 2022-06-22 2022-07-04 2022-07-01 2022-08-08 2022-07-08 2023-02-04 ordination ant Selection seline study of the project TJ-SRASP-321733-CS-CDS / Strengthening seed, seedlin National Consultant for proje IDA / D8600 g and planting material syst Post Direct Selection Direct - National 14,000.00 0.00 Signed 2022-11-04 2022-11-04 2022-11-06 2022-10-21 2022-11-08 2023-02-28 ct development to rise additi ems onal financial resources for C RW ERF within SRASP TJ-SRASP-325596-CS-INDV / Lawyer to prepare document s on legal changes of the Sta te Unitary Enterprise "Center Strengthen public capacity f Individual Consult Under Implement for Agricultural Staff Professi IDA / D8600 or crises prevention and ma Post Open - National 10,000.00 0.00 2022-11-15 2022-11-23 2023-01-03 2023-01-08 2023-01-14 2023-06-13 ant Selection ation onal Development" under the nagement Ministry of Agriculture into th e State Unitary Enterprise "C enter for Digital Developmen t and Agricultural Staf TJ-SRASP-361675-CS-INDV / National consultant for techni Strengthening seed, seedlin Individual Consult Under Implement cal support of laboratories of IDA / D8600 g and planting material syst Post Open - National 3,450.00 0.00 2023-05-15 2023-05-23 2023-06-06 2023-06-08 2023-06-12 2023-07-07 ant Selection ation Institute of seed production o ems f the Academy of Agricultural Sciences of Tajikistan TJ-SRASP-361677-CS-INDV / National consultant for techni Strengthening seed, seedlin cal support of laboratories of Individual Consult Under Implement IDA / D8600 g and planting material syst Post Open - National 3,450.00 0.00 2023-05-15 2023-05-23 2023-06-06 2023-06-08 2023-06-12 2023-07-07 Institute of Soil Science and ant Selection ation ems Agrochemistry of the Acade my of Agricultural Sciences o f Tajikistan TJ-AED PIU-361689-CS-INDV / National consultant for tech Strengthening seed, seedlin Individual Consult Under Implement nical support of laboratories IDA / D8600 g and planting material syst Post Open - National 3,450.00 0.00 2023-05-15 2023-05-23 2023-06-06 2023-06-08 2023-06-12 2023-07-07 ant Selection ation of State Institute «Plant prote ems ction and agrochemistry» SRASP AF/CS/DS-2023/01 / C Strengthening seed, seedlin Under Implement onduction of survey for identi IDA / E1450 g and planting material syst Post Direct Selection Direct - National 150,000.00 0.00 2023-06-06 2023-06-15 2023-06-16 2023-06-28 2023-08-12 ation fication of the vulnerable far ems mers Page 5 PLANO DE AQUISIÇÕES GOVERNO DO ESTADO DO RIO GRANDE DO NORTE SECRETARIA DE ESTADO DO PLANEJAMENTO E DAS FINANÇAS PROJETO INTEGRADO DE DESENVOLVIMENTO SUSTENTÁVEL UNIDADE GERENCIAMENTO DO PROJETO - UGP I.Considerações Gerais 1. Informações sobre o Projeto País: Brasil Mutuário: Estado do Rio Grande do Norte Nome do Projeto: Projeto Integrado de Desenvolvimento Sustentável - RN Sustentável Projeto Nº: P126452 Empréstimo Nº.: 82760-BR 2. Período coberto pelo plano de licitação 15/03/201 15/09/201 Original: (18 meses) 3 a 4 10/14/201 14/04/201 Revisão nº 1: (18 meses) 3 a 5 28/02/201 Revisão nº 2: (18 meses) 8/1/2014 a 6 Revisão nº 2: (18 meses) 3. Data de aprovação do Banco do Plano de Aquisição Original: 10/05/13 Revisão nº 1: 16/10/13 Revisão nº 2 : 4. Data do Aviso Geral de Licitação Original: Revisão nº 1: Revisão nº 2: II. Bens, Obras e Serviços que não sejam de Consultoria. 1. Limites da Revisão Prévia As decisões sobre Aquisições estão sujeitas a uma Revisão Prévia feita pelo Banco Mundial, conforme indicado nas Diretrizes (Anexo 1) para Aquisições financiadas por empréstimos do Banco Internacional para Reconstrução e Desenvolvimento - BIRD e Crédito da Associação Internacional de Desenvolvimento - AID, e de acordo com os limites estabelecidos pelas Diretrizes do Banco. Aquisições (Bens, Obras e Serviços não Consultoria): Mé Revisão Prévia Bens e Consultorias Natureza do tod Limites do Banco Obras Serviços Empresa Contrato o (US$) Mundial Todas as etapas ≥ $5 ICB de todos os milhões processos ≥ Primeiro processo Bens e Serviços NC $100,000 e todos acima de Comuns B (a) < $5 US$ 500 mil milhões ICB SBQC Sho SBQ <$ ppi Primeiro processo SMC 100,000 ng SOF ≥ $25 Todos os ICB milhões processos ≥ Primeiro processo NC $200,000 e todos acima de Obras B < $25 $25,000, US$ 5 milhões milhões 000 Sho < ppi $200,000 ng (a)Parabens e serviços comuns pode ser utilizado o pregão eletrônico em substituição a NCB $5,000,0 $5,000,0 00 00 Mé tod Revisão Prévia Servicos de o Limites do Banco consultoria de (US$) Mundial Lici taç ão ≥ Todas as etapas, $500,000 de todos os SB (b) processos NCB QC, ≥ Todas as etapas, SB $100,000 de todos os Q, < processos acima SM $500,000 de US$ 100 mil C. (c) Empresas SOF < A UGP será $500,00 $100,000 responsável pela 0 (d) revisão Todas as etapas ≤ do primeiro SQ US$300,0 processo, por C 00 modalidade de $300,0 seleção 00 Seç ão V– O primeiro Gui processo e todos Consultor deli N/A os processos Individual nes acima de US$ 50 de mil Con sult oria $200,000 (b) Lista Curta composta por 6 empresas, sendo no máximo 2 do mesmo país. É preciso dar publicidade internacional pelo DB e DG (c) Lista Curta composta por 6 empresas, que podem ser todas nacionais, mas é preciso dar publicidade internacional pelo DB e DG (d) Lista Curta composta por 6 empreas, que podem ser $100,00 todas nacionais $100,000 0 TODAS AS CONTRATACOES DIRETAS SERÃO SUJEITAS A REVISÃO PREVIA SHOPPING SQC (a) (a) SQC só deve ser utilizada nos casos em que não seja vantajosa a competição, limitados a US$300 mil. Independente do valor, SBQC é o método preferível. PROCUREMEN Brazil : Rio Grande do Norte: Regional Development and Governance T PLAN General Information Country: Brazil 2017-04-28 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank2023-05-22 if none) Project ID: P126452 GPN Date: Project Name: Rio Grande do Norte: Regional Development and Governance Loan / Credit No: IBRD / 82760 Secretariat of Planning and Finance of the State of Rio Grande do Norte Executing Agency(ies): WORKS Activity Reference No. Procurement Estimate Actual Specific Procureme Proposal Submissio Bid Evaluation Rep Loan / Credit Market Appro Procurement P Prequalificati High SEA/SH Process Draft Pre-qualificati Prequalification Eva Draft Bidding Docu Bidding Documents Contract Comp / Description Component Review Type Method Document T d Amoun Amount nt Notice / Invitatio n / Opening / Minut ort and Recommen Signed Contract No. ach rocess on (Y/N) Risk Status on Documents luation Report ment / Justification as Issued letion ype t (US$) (US$) n es dation for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne d ID97 CW / SERVICOS COM Component 3: Public Sect 52,966.3 Complete 2017-04- 2017-04- 2017-05- 2017-11- 2017-11 PLEMENTARES DE OBRAS IBRD / 82760 Post Direct Selection Direct 62,500.00 or Management 9 d 30 30 21 15 -17 DA CENTRAL DO CIDADAO DE PARELHAS 84952/2016-2 / CONSTRU Component 2: Improving P Request for Bid Single Stage - Tw 19,600,61 2016-04- 2017-07- 2016-05- 2016-06- 2017-08- 2016-07- 2016-09- 2018-03 CAO DO HOSPITAL DA MUL IBRD / 82760 Prior Open - National 0.00 Canceled ublic Services s o Envelope 0.00 22 28 22 21 22 21 19 -13 HER EM MOSSORO 30027/2015-3 / IMPLANTA Component 1: Sustainable Request for Bid Single Stage - On 4,285,714. 5,531,03 Complete 2017-02- 2017-02- 2017-03- 2017-02- 2017-04- 2018-02- 2017-05- 2018-04- 2018-11 CAO DE SISTEMA DE ESGO IBRD / 82760 Post Open - National Regional Development s e Envelope 00 4.56 d 24 24 01 15 12 02 12 13 -03 TAMENTO SANITARIO DE C ERRO CORA 78100/2016-2 / IMPLANTA CAO DE SISTEMA DE ESGO Component 1: Sustainable Request for Bid Single Stage - On 3,428,571. 6,941,85 Complete 2016-11- 2017-02- 2016-12- 2017-01- 2017-03- 2017-02- 2018-08- 2017-04- 2017-06- 2018-09 IBRD / 82760 Post Open - National TAMENTO SANITARIO DE S Regional Development s e Envelope 00 0.12 d 30 20 05 04 30 15 22 01 20 -23 AO MIGUEL DO GOSTOSO ID46 4 CW / REFORMA DE Component 3: Public Sect Request for Bid Single Stage - On 1,656,250. 1,372,46 2017-05- 2017-05- 2017-07- 2017-09- 2017-08- 2018-08- 2017-09- 2017-12- 2018-03 CENTRAIS DO CIDADAO DO IBRD / 82760 Post Open - National Signed or Management s e Envelope 00 6.19 25 30 11 13 10 21 14 04 -13 INTERIOR: PARNAMIRIM, A SSU, ALEXANDRIA ID26 CW / CONSTRUCAO D O LABORATORIO DE INSPE CAO DE PRODUTOS DE ORI Component 1: Sustainable Request for Bid Single Stage - On 285,714.0 2017-08- 2017-08- 2017-09- 2017-10- 2017-11- 2018-07 IBRD / 82760 Post Open - National 0.00 Canceled GEM ANIMAL E SANIDADE Regional Development s e Envelope 0 30 30 04 16 30 -28 APICOLA NA UNIVERSIDAD E FEDERAL RURAL DO SEMI ARIDO - UFERSA, EM MOSS ORO/RN ID35 CW / REFORMA DO P Component 3: Public Sect Request for Bid Single Stage - On 857,142.0 1,659,38 2016-07- 2018-04- 2016-07- 2016-08- 2018-05- 2016-09- 2018-06- 2016-10- 2018-06- 2017-10 IBRD / 82760 Post Open - National Signed ALACIO DO GOVERNO - PIN or Management s e Envelope 0 5.12 30 11 30 04 18 15 13 30 21 -25 ACOTECA ID36 CW / OBRAS PARA IN Component 1: Sustainable Request for Bid Single Stage - On 218,806.0 2016-07- 2016-07- 2016-08- 2016-09- 2016-10- 2017-05 IBRD / 82760 Post Open - National 0.00 Canceled STALACAO DO PLANETARIO Regional Development s e Envelope 0 30 30 04 15 30 -28 ID4 2 CW / CONSTRUÇÃO DE ESCOLAS DE CEARÁ-MI Component 2: Improving P Request for Bid Single Stage - On 4,375,000. 2,279,77 2017-05- 2017-08- 2017-05- 2017-07- 2017-09- 2017-08- 2017-12- 2017-09- 2017-12- 2018-03 IBRD / 82760 Post Open - National Signed RIM (ASSENTAMENTO ROS ublic Services s e Envelope 00 1.72 24 13 29 10 15 09 20 13 28 -12 ÁRIO), MACAÍBA E SÃO GO NÇALO DO AMARANTE ID46 1 CW / CONSTRUCAO DE CENTRAIS DO CIDADAO Component 3: Public Sect Request for Bid Single Stage - On 3,906,250. 997,167. Complete 2017-01- 2017-02- 2017-03- 2017-04- 2018-04- 2017-05- 2018-04- 2017-11 IBRD / 82760 Post Open - National DO INTERIOR: CURRAIS NO or Management s e Envelope 00 83 d 30 04 18 17 11 22 24 -18 VOS, PAU DOS FERROS E M ACAU ID46 2 CW / CONSTRUCAO DE CENTRAIS DO CIDADAO Component 3: Public Sect Request for Bid Single Stage - On 4,875,000. 3,354,93 2017-03- 2017-03- 2017-04- 2017-07- 2017-05- 2017-08- 2017-06- 2017-12- 2017-12 DO INTERIOR: SAO PAULO IBRD / 82760 Post Open - National Signed or Management s e Envelope 00 9.15 01 06 17 20 17 21 21 04 -18 DO POTENGI, NOVA CRUZ, APODI, CEARA MIRIM, CAR AUBAS E JOAO CAMARA ID46 3 CW / CONSTRUCAO DE CENTRAIS DO CIDADAO Component 3: Public Sect Request for Bid Single Stage - On 2,312,500. 1,841,72 Complete 2017-03- 2017-03- 2017-04- 2017-09- 2017-05- 2018-08- 2017-06- 2018-02- 2017-12 IBRD / 82760 Post Open - National DO INTERIOR: SAO JOSE D or Management s e Envelope 00 3.26 d 02 07 18 12 18 21 22 09 -19 E MIPIBU, SANTA CRUZ E M ACAIBA ID46 6 CW / CONSTRUÇÃO Component 3: Public Sect Request for Bid Single Stage - On 790,000.0 1,073,04 Complete 2017-06- 2018-08- 2017-06- 2017-07- 2017-08- 2018-11- 2017-09- 2018-12- 2018-03 E AMPLIAÇÕES/REFORMAS IBRD / 82760 Post Open - National or Management s e Envelope 0 0.68 d 03 20 08 20 19 12 23 03 -22 DE CENTRAIS DO CIDADÃO DO INTERIOR: CAICO ID47 2CW / OBRAS DOS A Component 3: Public Sect Request for Bid Single Stage - On 1,900,000. 1,635,73 Complete 2017-05- 2017-05- 2017-05- 2017-07- 2017-08- 2017-08- 2017-09- 2017-09- 2017-10- 2018-03 CESSOS AO CENTRO ADMI IBRD / 82760 Post Open - National or Management s e Envelope 00 5.77 d 19 29 24 05 29 04 27 02 10 -31 NISTRATIVO DO ESTADO ID48 CW / CONSTRUCAO D Component 1: Sustainable Request for Bid Single Stage - On 1,163,702. 2017-05- 2017-05- 2017-05- 2017-06- 2017-08- 2018-01 IBRD / 82760 Post Open - National 0.00 Canceled A ESCOLA DO ARTESAO - N Regional Development s e Envelope 28 05 05 10 21 04 -31 ATAL ID79 1 CW / PAVIMENTACA O DOSTRECHOS DE RODO Component 1: Sustainable Request for Bid Single Stage - On 19,500,00 11,144,3 2017-02- 2017-06- 2017-02- 2017-04- 2017-12- 2017-05- 2018-01- 2017-06- 2018-03- 2018-06 IBRD / 82760 Prior Open - National Signed VIAS ETAPA II: RN 016 (CA Regional Development s e Envelope 0.00 45.51 19 13 24 07 19 07 29 11 16 -06 RNAUBAIS - ESTRADA DO C AJU) ID79 3 CW / PAVIMENTACA O DOSTRECHOS DE RODO Component 1: Sustainable Request for Bid Single Stage - On 10,000,00 7,132,83 2017-05- 2017-06- 2017-05- 2017-07- 2017-08- 2018-02- 2017-09- 2018-03- 2018-09 IBRD / 82760 Prior Open - National Signed VIAS ETAPA IV: RN 011 - ES Regional Development s e Envelope 0.00 1.71 17 30 22 03 02 07 06 16 -01 TRADA DA CASTANHA - SE RRA DO MEL ID89 CW / OBRAS PARA IM PLANTACAO DE ABASTECI Component 1: Sustainable Request for Bid Single Stage - On 2,406,250. 1,317,23 Complete 2017-06- 2017-06- 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- 2017-09- 2017-10- 2018-03 IBRD / 82760 Post Open - National MENTO DE AGUA EM COMU Regional Development s e Envelope 00 3.47 d 07 21 07 12 25 24 25 07 10 -06 NIDADES DE PEDRA GRAN DE E BARAUNAS ID91 CW / OBRAS DE IMPL Component 1: Sustainable Request for Bid Single Stage - On 4,037,267. 2017-05- 2017-05- 2017-05- 2017-06- 2017-08- 2017-12 ANTACAO DO PARQUE TEC IBRD / 82760 Post Open - National 0.00 Canceled Regional Development s e Envelope 00 05 05 10 21 05 -03 NOLOGICO: TERRAPLENAG EM ID92 CW / OBRAS DE IMPL ANTACAO DO PARQUE TEC NOLOGICO: DRENAGEM, PA Component 1: Sustainable Request for Bid Single Stage - On 4,037,267. 2017-05- 2017-05- 2017-05- 2017-06- 2017-08- 2018-07 IBRD / 82760 Post Open - National 0.00 Canceled VIMENTACAO, REDE DE AB Regional Development s e Envelope 00 05 05 10 21 05 -31 ASTECIMENTO E AGUA E C OMBANTE A INCENDIO; CO LETA E TRATAMENTO DE E SGOTOS ID93 CW / OBRAS DE IMPL ANTACAO DO PARQUE TEC Component 1: Sustainable Request for Bid Single Stage - On 4,037,267. 2017-04- 2017-04- 2017-04- 2017-05- 2017-07- 2018-01 IBRD / 82760 Post Open - National 0.00 Canceled NOLOGICO: REDE DE ILUMI Regional Development s e Envelope 00 07 07 12 24 08 -04 NACAO E FORCA; REDE DE FIBRA OTICA E TELEFONIA ID94 CW / OBRAS DE IMPL Component 1: Sustainable Request for Bid Single Stage - On 4,037,267. 2017-05- 2017-05- 2017-05- 2017-07- 2017-08- 2018-08 ANTACAO DO PARQUE TEC IBRD / 82760 Post Open - National 0.00 Canceled Regional Development s e Envelope 00 19 19 24 05 18 -13 NOLOGICO: EDIFICACOES ID95 CW / OBRAS DE IMPL Component 1: Sustainable Request for Bid Single Stage - On 217,070.4 2017-05- 2017-05- 2017-06- 2017-07- 2017-08- 2018-02 ANTACAO DO PARQUE TEC IBRD / 82760 Post Open - National 0.00 Canceled Regional Development s e Envelope 1 31 31 05 17 31 -27 NOLOGICO: URBANIZACAO E PAISAGISMO ID96 CW / OBRAS DE IRRI Component 1: Sustainable Request for Bid Single Stage - On 1,085,714. 1,594,34 2017-06- 2017-02- 2017-06- 2017-06- 2018-04- 2017-08- 2018-04- 2017-09- 2018-06- 2018-03 IBRD / 82760 Post Open - National Signed GACAO DO BAIXO ACU Regional Development s e Envelope 00 4.59 15 06 15 20 12 01 20 15 05 -14 ID102 CW / SERVIÇOS CO Component 3: Public Sect Request for Quo Single Stage - On 187,500.0 149,574. Complete 2017-08- 2018-08- 2017-10- 2017-11- 2018-03 MPLEMENTARES A OBRA D IBRD / 82760 Post Limited or Management tations e Envelope 0 01 d 06 20 01 09 -30 A CENTRAL DO CIDADÃO D A ZONA SUL ID103 CW / SERVIÇOS CO Component 3: Public Sect Request for Quo Single Stage - On 187,500.0 186,638. 2017-08- 2018-12- 2017-10- 2018-12- 2018-03 MPLEMENTARES A OBRA D IBRD / 82760 Post Limited Signed or Management tations e Envelope 0 30 06 06 01 27 -30 A CENTRAL DO CIDADÃO D A ZONA NORTE 403811/2016-2 / CONSTR UÇÃO DE UMA ESTACÃO D Component 1: Sustainable Request for Bid Single Stage - On 1,085,714. 996,575. 2017-08- 2017-08- 2017-10- 2017-10- 2017-11- 2017-11- 2017-12- 2017-12- 2018-06 IBRD / 82760 Post Open - National Signed E PISCICULTURA PARA PRO Regional Development s e Envelope 00 47 16 21 02 24 01 22 06 05 -04 DUÇÃO DE ALEVINO EM AP ODI ID4 1 CW / CONSTRUÇÃO Component 2: Improving P Request for Bid Single Stage - On 5,093,750. 3,864,09 2017-05- 2017-05- 2017-07- 2017-08- 2017-12- 2017-09- 2018-02- 2018-03 DE ESCOLAS DE CEARÁ-MI IBRD / 82760 Prior Open - National Signed ublic Services s e Envelope 00 9.20 16 21 02 01 18 05 05 -04 RIM (MURIÚ), CARAÚBAS E JOÃO CÂMARA ID3 4 GO / AQUISIÇÃO DE EQUIPAMENTO ESPECIAL P Component 1: Sustainable 2017-08- 2017-08- 2017-09- 2018-03 ESTICIDAS RESIDUAIS PAR IBRD / 82760 Post Direct Selection Direct 7,803.12 0.00 Canceled Regional Development 09 14 18 -17 A ESPECTRÔMETRO PARA E STRUTURAÇÃO DO LABOR ATÓRIO DA UFERSA ID100 CW / RN 063 RECUP ERAÇÃO ESTRUTURAL, DRE Component 1: Sustainable Request for Bid Single Stage - On 2,353,538. 1,887,91 Complete 2017-09- 2017-08- 2017-09- 2017-10- 2017-09- 2017-11- 2018-01- 2017-12- 2018-02- 2018-06 IBRD / 82760 Post Open - National NAGEM, SINALIZAÇÃO E M Regional Development s e Envelope 00 4.68 d 01 25 06 18 29 17 23 22 22 -20 ELHORIAS DO ACESSO TAB ATINGA A BARRETA ID79 2 CW / PAVIMENTACA Component 1: Sustainable Request for Bid Open - Internatio Single Stage - On 8,200,000. 5,252,16 2017-09- 2017-10- 2017-09- 2017-10- 2017-11- 2017-12- 2017-12- 2018-02- 2018-06 O DOSTRECHOS DE RODO IBRD / 82760 Prior Signed Regional Development s nal e Envelope 00 8.58 01 06 06 18 17 20 22 09 -20 VIAS ETAPA III: ESTRADA D O MELAO - BARAUNA ID104 CW / CONSTRUÇÃO Component 3: Public Sect Request for Bid Single Stage - On 937,500.0 2017-09- 2018-06- 2017-09- 2017-10- 2017-11- 2018-06- 2017-12- 2018-06 IBRD / 82760 Post Open - National 0.00 Canceled CENTRAL DO CIDADÃO DA or Management s e Envelope 0 01 13 06 18 17 13 22 -20 ZONA LESTE 382713/2016-5 / INSTALA ÇÃO DE PLACAS DE SINALI Under Im Component 1: Sustainable Request for Bid Single Stage - On 1,210,970. 2017-09- 2017-09- 2017-10- 2017-10- 2017-11- 2018-04- 2017-12- 2018-06 ZAÇÃO TURÍSTICA NOS PO IBRD / 82760 Post Open - National 0.00 plementa Regional Development s e Envelope 00 01 06 18 04 17 20 22 -20 LOS TURÍSTICO COSTA BRA tion NCA, SERIDO, AGRESTE/TR AIRI E SERRANO 79716/2016-1 / OBRAS DE Component 1: Sustainable Request for Bid Single Stage - On 345,714.0 517,358. 2017-09- 2018-04- 2017-09- 2017-10- 2018-05- 2017-11- 2018-05- 2017-12- 2018-06- 2018-06 IBRD / 82760 Post Open - National Signed RESTAURAÇÃO DO EDTAM Regional Development s e Envelope 0 94 01 12 06 18 15 17 25 22 18 -20 79720/2016-1 / OBRAS DE Component 1: Sustainable Request for Bid Single Stage - On 1,514,285. 2,586,28 2017-09- 2018-04- 2017-09- 2017-10- 2018-05- 2017-11- 2018-06- 2017-12- 2018-06- 2018-06 RESTAURAÇÃO DO TAM - T IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 00 2.41 01 12 06 18 15 17 13 22 19 -20 EATRO ALBERTO MARANHà O ID79 4 CW / IMPLANTAÇÃO E PAVIMENTAÇÃO DA ROD Component 1: Sustainable Request for Bid Open - Internatio Single Stage - On 4,166,821. 2,441,46 Complete 2017-05- 2017-05- 2017-07- 2018-01- 2017-08- 2018-02- 2017-09- 2018-03- 2018-09 IBRD / 82760 Post OVIA RN-087, SUBTRECHO Regional Development s nal e Envelope 00 6.06 d 22 27 08 31 07 22 11 23 -06 LAGOA NOVA A ENTR. RN-0 42(TUPÃ) ID78 CW / PAVIMENTACAO DOSTRECHOS DE RODOVIA Component 1: Sustainable Request for Bid Single Stage - On 4,884,806. 2,829,78 2016-12- 2017-06- 2016-12- 2017-02- 2017-08- 2017-03- 2018-08- 2017-04- 2017-12- 2017-10 S ETAPA I: PAVIMENTACAO IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 00 2.72 19 26 24 04 31 06 21 10 28 -07 DA RN 160 - ENTRADA BR 406 S. G. DO AMARANTE - ENT. BR 226 - MACAIBA ID105 CW / CERCAMENTO Component 3: Public Sect Request for Bid Single Stage - On 625,000.0 2017-09- 2018-06- 2017-09- 2017-10- 2018-05- 2017-11- 2018-06- 2017-12- 2018-06 IBRD / 82760 Post Open - National 0.00 Canceled DO CENTRO ADMINISTRATI or Management s e Envelope 0 01 13 06 18 08 17 13 22 -20 VO ID106 CW / RESTAURAÇÃO Component 1: Sustainable Request for Bid Single Stage - On 1,604,125. 1,063,97 2017-09- 2018-06- 2017-09- 2017-10- 2018-01- 2017-11- 2018-06- 2017-12- 2018-03- 2018-06 E REFORMA DO TEATRO LA IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 00 9.77 04 13 09 21 12 20 13 25 07 -23 URO MONTE, MOSSORÓ - R N ID99 CW / RN 118 - RECUP ERAÇÃO ESTRUTURAL, DRE NAGEM, SINALIZAÇÃO E M Component 1: Sustainable Request for Bid Single Stage - On 14,009,61 9,489,41 2017-09- 2018-01- 2017-09- 2018-06- 2017-10- 2018-05- 2017-11- 2018-07- 2017-12- 2018-09- 2018-06 ELHORIAS - ENTRONCAME IBRD / 82760 Prior Open - National Signed Regional Development s e Envelope 7.00 6.34 06 26 11 07 23 08 22 06 27 17 -25 NTO DA BR 226 (JUCURUTU - CAICÓ) E DA RN 307 - EN TROCAMENTO DA BR 101 GENIPABU RN 304 E 306 84952/2016 / CONSTRUÇà Component 2: Improving P Request for Bid Single Stage - On 19,600,61 21,963,7 2017-10- 2017-10- 2017-12- 2017-08- 2018-01- 2017-10- 2018-02- 2018-01- 2019-08 O DO HOSPITAL DA MULHE IBRD / 82760 Prior Open - National Signed ublic Services s e Envelope 0.00 30.34 17 22 06 22 05 22 09 01 -23 R EM MOSSORÓ ID 4 4 CW / REFORMA E A Component 2: Improving P Request for Bid Single Stage - On 5,100,000. 2,636,45 2017-10- 2018-04- 2017-11- 2018-06- 2017-12- 2018-07- 2018-01- 2018-08- 2018-02- 2018-10- 2018-08 MPLIAÇÃO DAS ESCOLAS E IBRD / 82760 Prior Open - National Signed ublic Services s e Envelope 00 8.28 30 24 04 19 16 16 15 23 19 19 -18 STADUAIS - BLOCO III ID4 5 CW / REFORMA E AM Component 2: Improving P Request for Bid Single Stage - On 5,100,000. 5,409,85 2017-10- 2018-08- 2017-11- 2018-09- 2017-12- 2018-10- 2018-01- 2019-03- 2018-02- 2019-04- 2018-08 PLIAÇÃO DAS ESCOLAS ES IBRD / 82760 Prior Open - National Signed ublic Services s e Envelope 00 8.98 30 21 04 06 16 11 15 19 19 19 -18 TADUAIS - BLOCO III ID4 3 CW / REFORMA E AM PLIACAO DE 9 ESCOLAS ES TADUAIS NOS MUNICIPIOS Component 2: Improving P Request for Bid Single Stage - On 7,000,000. 5,899,71 2017-10- 2018-01- 2017-11- 2018-05- 2017-12- 2018-05- 2018-01- 2018-08- 2018-02- 2018-09- 2018-08 IBRD / 82760 Prior Open - National Signed DE NATAL, TANGARA, UMA ublic Services s e Envelope 00 9.30 30 26 04 22 16 23 15 24 19 17 -18 RIZAL, CEARA-MIRIM, SANT A CRUZ, CURRAIS NOVOS E CAICO - BLOCO I ID47 3 CW / OBRAS DO CE NTRO ADMINISTRATIVO: FA Component 3: Public Sect Request for Bid Single Stage - On 2,855,000. 1,730,74 2018-01- 2018-01- 2018-01- 2018-02- 2018-04- 2018-03- 2018-02- 2018-04- 2018-03- 2018-10 IBRD / 82760 Post Open - National Signed CHADA DAS SECRETARIAS or Management s e Envelope 00 5.85 08 26 13 24 04 26 28 30 08 -27 E PAISAGISMO (ID47 3 CW) ID47 5 CW / OBRAS DO CE Component 3: Public Sect Request for Bid Single Stage - On 625,000.0 643,365. Complete 2018-01- 2018-07- 2018-01- 2018-03- 2018-09- 2018-04- 2018-10- 2018-05- 2018-10- 2018-11 IBRD / 82760 Post Open - National NTRO ADMINISTRATIVO: IL or Management s e Envelope 0 72 d 22 13 27 10 13 09 24 14 30 -10 UMINAÇÃO ID47 4 CW / OBRAS DO CE Component 3: Public Sect Request for Bid Single Stage - On 1,562,500. 2,757,78 2018-02- 2018-08- 2018-02- 2018-03- 2018-10- 2018-04- 2018-11- 2018-05- 2018-11- 2018-11 NTRO ADMINISTRATIVO DO IBRD / 82760 Post Open - National Signed or Management s e Envelope 00 2.41 01 30 06 20 02 19 30 24 29 -20 ESTADO: RECUPERAÇÃO D O PAPÓDROMO ID47 1CW / OBRAS DE INF RAESTRUTURA DO CENTRO Component 3: Public Sect Request for Bid Single Stage - On 5,500,000. 4,210,18 2017-12- 2018-02- 2018-01- 2018-04- 2018-02- 2018-05- 2018-03- 2018-07- 2018-04- 2018-09- 2018-10 ADMINISTRATIVO DO ESTA IBRD / 82760 Prior Open - National Signed or Management s e Envelope 00 5.26 28 23 02 23 13 08 15 11 13 21 -10 DO: PAVIMENTAÇÃO, ACES SIBILIDADE, DRENAGEM, C ERCAMENTO ID 111 / OBRAS DE RECUP Component 1: Sustainable Request for Bid Single Stage - On 2,580,594. 1,782,65 2017-12- 2018-04- 2017-12- 2018-05- 2018-02- 2018-09- 2018-03- 2018-09- 2018-04- 2018-09- 2018-10 ERAÇÃO DAS BARRAGENS IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 06 6.27 21 13 26 28 06 13 08 28 12 28 -09 DE LUCRÉCIA E PATAXÓ ID112 CW / OBRAS DE REC Under Im UPERAÇÃO DAS BARRAGE Component 1: Sustainable Request for Bid Single Stage - On 4,306,337. 2018-01- 2018-05- 2018-01- 2018-05- 2018-03- 2018-08- 2018-04- 2018-12- 2018-05- 2018-11 IBRD / 82760 Post Open - National 0.00 plementa NS DE NOVO ANGICOS, BO Regional Development s e Envelope 82 23 09 28 14 11 28 10 05 15 -11 tion QUEIRÃO DE ANGICOS, BO DÓ E APANHA PEIXE 30027/2015-4 / IMPLANTA Component 1: Sustainable Request for Bid Single Stage - On 4,285,714. 4,780,49 2018-02- 2018-02- 2018-04- 2018-05- 2018-02- 2018-06- 2018-04- 2018-12 ÇÃO DE SISTEMA DE ESGO IBRD / 82760 Prior Open - National Signed Regional Development s e Envelope 00 8.87 16 21 04 04 22 08 13 -05 TAMENTO SANITÁRIO DE C ERRO CORA ID114 CW / CONSTRUÇÃO Component 3: Public Sect Request for Bid Single Stage - On 625,000.0 430,112. 2018-02- 2018-08- 2018-02- 2018-08- 2018-04- 2018-09- 2018-05- 2018-10- 2018-06- 2018-10- 2018-12 DA CENTRAL DO CIDADÃO IBRD / 82760 Post Open - National Signed or Management s e Envelope 0 01 21 13 26 22 09 26 09 15 13 30 -10 DE SÃO MIGUEL ID46 7 CW / REFORMAS D Component 3: Public Sect Request for Quo Single Stage - On 131,250.0 136,769. 2018-03- 2018-05- 2018-08- 2018-10 E CENTRAL DO CIDADÃO D IBRD / 82760 Post Limited Signed or Management tations e Envelope 0 80 07 02 29 -29 O INTERIOR: MOSSORÓ ID46 5 CW / REFORMAS D Component 3: Public Sect Request for Bid Single Stage - On 790,000.0 2017-07- 2018-07- 2017-07- 2017-08- 2018-08- 2017-09- 2017-10- 2018-04 E CENTRAIS DO CIDADAO IBRD / 82760 Post Open - National 0.00 Canceled or Management s e Envelope 0 03 31 08 19 17 18 23 -21 DO INTERIOR: MOSSORO ID116 CW / OBRAS DE RES Component 3: Public Sect Request for Bid Single Stage - On 1,303,986. 2018-03- 2018-07- 2018-03- 2018-05- 2018-05- 2018-08- 2018-06- 2018-09- 2018-07- 2019-01 IBRD / 82760 Post Open - National 0.00 Canceled TAURAÇÃO DO FORTE DOS or Management s e Envelope 91 19 09 24 28 05 08 04 28 09 -05 REIS MAGOS ID4 6 CW / REFORMA E AM Component 2: Improving P Request for Bid Single Stage - On 5,100,000. 4,008,84 2018-03- 2018-11- 2018-03- 2018-12- 2018-05- 2019-01- 2018-06- 2019-06- 2018-07- 2020-03- 2019-01 PLIAÇÃO DAS ESCOLAS ES IBRD / 82760 Prior Open - National Signed ublic Services s e Envelope 00 3.58 20 12 25 18 06 17 05 24 10 21 -06 TADUAIS - BLOCO IV ID113 CW / RECUPERAÇÃO EMERGENCIAL DO REVESTI Component 1: Sustainable 13,020.0 Complete 2018-01- 2018-02- 2018-01- 2018-02- 2018-03- 2018-04- 2018-08 IBRD / 82760 Post Direct Selection Direct 15,625.00 MENTO DO TALUDE JUSAN Regional Development 0 d 23 20 28 15 04 13 -31 TE DA BARRAGEM DE LUCR ÉCIA ID107 CW / IMPLANTAÇÃO DE SISTEMA DE ABASTECI Component 1: Sustainable Request for Bid Single Stage - On 781,250.0 357,389. Complete 2018-08- 2018-08- 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-11- 2019-06 IBRD / 82760 Post Open - National MENTO DE ÁGUA DE COMU Regional Development s e Envelope 0 39 d 24 10 29 10 25 09 15 14 08 -12 NIDADE RURAIS NO MUNICÍ PIO DE CAMPO REDONDO ID108 CW / AMPLIAÇÃO D Component 1: Sustainable Request for Bid Single Stage - On 1,625,000. 1,358,48 Complete 2018-08- 2018-09- 2018-08- 2018-10- 2018-09- 2018-11- 2018-10- 2018-12- 2018-10- 2019-06 E SISTEMA DE ABASTECIME IBRD / 82760 Post Open - National Regional Development s e Envelope 00 5.77 d 24 25 29 10 25 09 15 14 27 -12 NTO DE JARDIM DO SERIDÓ ID109 CW / PAVIMENTAÇà O DE ESTRADA DO ACESS Component 1: Sustainable Request for Bid Single Stage - On 7,281,250. 4,142,07 2018-08- 2020-02- 2018-09- 2018-10- 2020-05- 2018-11- 2020-06- 2018-12- 2020-06- 2019-06 IBRD / 82760 Prior Open - National Signed O SUL DO AEROPORTO - B Regional Development s e Envelope 00 2.61 30 28 04 16 05 15 10 20 27 -18 OA VISTA- SÃO GONÇALO DO AMARANTE ID125CW / REFORMA NO H Component 2: Improving P Request for Quo Single Stage - On 109,375.0 121,785. 2018-09- 2018-10- 2019-02- 2019-04 OSPITAL REGIONAL DO SER IBRD / 82760 Post Limited Signed ublic Services tations e Envelope 0 64 04 30 13 -28 IDÓ - CAICÓ PARA INSTALA ÇAO DE TOMOGRÁFO ID126CW / REFORMA NO H Component 2: Improving P Request for Quo Single Stage - On 109,375.0 88,383.1 2018-09- 2019-12- 2018-11- 2019-03- 2019-05 OSPITAL REGIONAL DE PAU IBRD / 82760 Post Limited Signed ublic Services tations e Envelope 0 0 08 13 03 14 -02 DOS FERROS PARA INSTAL AÇÃO DE TOMOGRAFO ID98 CW / OBRAS DE REF Component 2: Improving P Request for Bid Single Stage - On 1,416,605. 1,011,24 2017-08- 2018-10- 2017-08- 2017-09- 2019-01- 2017-10- 2019-01- 2017-11- 2019-02- 2018-02 ORMA DO HOSPITAL MARIA IBRD / 82760 Post Open - National Signed ublic Services s e Envelope 00 4.96 14 18 29 28 03 13 22 07 26 -05 ALICE PARA RECEBIMENTO DAS UTIS NEONATAL Page 1 ID128CW / INTERLIGAÇÃO DAS UNIDADES DA SESED Component 2: Improving P Request for Bid Single Stage - On 2,592,753. 1,014,91 2018-08- 2018-10- 2018-09- 2018-10- 2019-12- 2018-11- 2020-03- 2018-12- 2020-06- 2019-06 IBRD / 82760 Post Open - National Signed AO ANEL ÓTICO DA REGIà ublic Services s e Envelope 00 1.82 30 01 04 16 18 15 03 20 04 -18 O METROPOLITANA DE NAT AL ID129CW / AQUISICAO E I NSTALACAO DE SUBESTAC Component 1: Sustainable Request for Quo Single Stage - On 29,430.4 Complete 2018-09- 2018-11- 2018-11- 2019-02- 2019-05 IBRD / 82760 Post Limited 62,500.00 AO COM ABRIGO PARA O SI Regional Development tations e Envelope 4 d 11 14 06 05 -05 NE E MEMORIAL CAMARA C ASCUDO ID131CW / REFORMA DA C Component 1: Sustainable Request for Quo Single Stage - On 171,875.0 198,354. 2018-09- 2018-11- 2018-11- 2018-12- 2019-05 ASA DO ARTESÃO DO MUNI IBRD / 82760 Post Limited Signed Regional Development tations e Envelope 0 88 18 09 13 28 -12 CÍPIO DE CAICÓ ID132CW / SERVIÇOS COM PLEMENTARES DE ENGENH Component 3: Public Sect Request for Quo Single Stage - On 125,000.0 2018-09- 2018-11- 2018-11- 2019-05 IBRD / 82760 Post Limited 0.00 Canceled ARIA PARA A CENTRAL DO or Management tations e Envelope 0 22 09 17 -16 CIDADAO DA RODOVIARIA DO MUNICIPIO DE NATAL ID127CW / AMPLIAÇÃO DE SISTEMA DE ADUÇÃO DO A Component 1: Sustainable Request for Bid Single Stage - On 4,500,000. 1,861,17 2018-09- 2018-10- 2018-09- 2018-11- 2019-06- 2018-12- 2019-07- 2019-01- 2019-09- 2019-11 IBRD / 82760 Post Open - National Signed BASTECIMENTO DE ÁGUA Regional Development s e Envelope 00 6.71 24 10 29 10 06 10 23 14 15 -10 DE SÃO MIGUEL DO GOSTO SO ID4 4 CW LOTE7 / REFORM Component 2: Improving P Request for Bid Single Stage - On 428,863.8 343,031. 2018-09- 2018-04- 2018-09- 2018-11- 2018-07- 2018-12- 2018-08- 2019-01- 2018-10- 2019-07 IBRD / 82760 Post Open - National Signed A E AMPLIAÇÃO DA ESCOL ublic Services s e Envelope 7 18 21 24 26 07 16 07 24 11 16 -10 A (LOTE 7) ID4 7 CW / REFORMAS E A Component 2: Improving P Request for Bid Single Stage - On 3,800,000. 2,157,23 2018-09- 2018-12- 2018-09- 2018-12- 2018-10- 2019-01- 2018-11- 2020-04- 2019-01- 2020-02- 2019-07 MPLIAÇÕES DAS ESCOLAS IBRD / 82760 Post Open - National Signed ublic Services s e Envelope 00 4.04 14 04 19 14 31 17 30 01 04 05 -03 REMANESCENTE DOS BLOC OS I e II 383148/2018 / OBRAS DE RECUPERAÇÃO DE INSTALA ÇÕES FÍSICAS, HIDRÁULICA Component 1: Sustainable Request for Bid Single Stage - On 402,602.0 95,848.9 2018-10- 2017-11- 2018-10- 2018-11- 2018-02- 2018-12- 2018-03- 2019-01- 2018-06- 2019-07 E ELÉTRICAS DE BOVINOS, IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 0 0 05 07 10 21 16 21 13 25 12 -24 E CONSTRUÇÃO DE 03(TRÊ S) GALPÕES P/BOVINOS E DE CENTROS DE MANEJO P/ CAPRINOS (RELICITAÇÃO) ID130CW / SERVIÇOS COM PLEMENTARES DE ENGENH ARIA PARA CONSTRUÇÃO D Component 3: Public Sect Request for Quo Single Stage - On 185,715.0 155,591. 2018-09- 2019-02- 2018-11- 2019-05- 2019-05 IBRD / 82760 Post Limited Signed O LABORATÓRIO DE ANAT or Management tations e Envelope 0 57 16 08 11 01 -10 OMIA PATOLÓGICA E CITOP ATOLOGIA (ANATOMOHIST OCITOPATOLOGIA) 383148/2016-4 / OBRAS D E RECUPERAÇÃO/REFORMA DE INSTALAÇÕES FÍSICAS, Component 1: Sustainable Request for Bid Single Stage - On 328,571.0 2017-09- 2017-09- 2017-10- 2017-11- 2017-12- 2018-06 HIDRÁULICAS E ELÉTRICAS IBRD / 82760 Post Open - National 0.00 Canceled Regional Development s e Envelope 0 01 06 18 17 22 -20 DE BOVINOS, E CONSTRUÇ ÃO DE GALPÃO PARA BOVI NOS E DE CENTROS DE MA NEJO PARA CAPRINOS ID 132 1 CW / Serviços co Under Im mplementares de engenha Component 3: Public Sect Request for Bid Single Stage - On 420,000.0 2019-02- 2020-10- 2019-02- 2019-04- 2020-12- 2019-05- 2021-02- 2019-06- 2019-12 IBRD / 82760 Post Open - National 0.00 plementa ria para a Central do Cidad or Management s e Envelope 0 19 16 24 07 15 07 23 11 -08 tion ão da Rodoviária do Municí pio de Natal/RN 110 CW / OBRA DE ENGEN HARIA PARA INTERLIGAÇà Component 2: Improving P Request for Bid Single Stage - On 2,242,381. 2018-10- 2018-10- 2018-12- 2019-01- 2019-02- 2019-08 O DAS UNIDADES DA SESE IBRD / 82760 Post Open - National 0.00 Canceled ublic Services s e Envelope 32 22 27 08 07 11 -10 D AO ANEL ÓPTICO DA REG IÃO METROPOLITANA DE N ATAL ID122CW / RECUPERAÇÃO Component 1: Sustainable Request for Bid Single Stage - On 1,250,000. 2018-12- 2018-12- 2019-01- 2019-02- 2019-03- 2019-09 DE ESTRADAS DO PROJETO IBRD / 82760 Prior Open - National 0.00 Canceled Regional Development s e Envelope 00 05 10 21 20 27 -23 DO BAIXO AÇU- DIBA ID121CW / OBRAS DE REF Component 2: Improving P Request for Bid Single Stage - On 625,000.0 2018-11- 2018-11- 2019-01- 2019-02- 2019-03- 2019-09 ORMA PARA O CENTRO DE IBRD / 82760 Prior Open - National 0.00 Canceled ublic Services s e Envelope 0 23 28 09 08 15 -11 TREINAMENTO DA CFAPM - SESED ID133CW / REFORMA DA C Component 1: Sustainable Request for Quo Single Stage - On 156,250.0 2018-09- 2018-11- 2019-05 ENTRAL DE COMERCIALIZA IBRD / 82760 Post Limited 0.00 Canceled Regional Development tations e Envelope 0 29 24 -23 CAO DO ARTESANATO DE NATAL - PAPA JERIMUM. ID 120 1 CW / ESTRADA - RN 160 - ACESSO PARQUE Component 1: Sustainable Request for Bid Single Stage - On 1,687,500. 2019-04- 2019-04- 2019-06- 2019-07- 2019-08- 2020-02 IBRD / 82760 Post Open - National 0.00 Canceled TECNOLÓGICO -MACAÍBA - Regional Development s e Envelope 00 23 28 09 09 13 -09 (TRECHO ATÉ O ACESSO A O PARQUE - 9KM). ID120CW / ESTRADA - RN 160 - ACESSO PARQUE TEC Component 1: Sustainable Request for Bid Single Stage - On 1,687,500. 2018-10- 2018-10- 2018-12- 2019-01- 2019-02- 2019-08 IBRD / 82760 Prior Open - National 0.00 Canceled NOLÓGICO -MACAÍBA - (TR Regional Development s e Envelope 00 24 29 10 09 13 -12 ECHO ATÉ O ACESSO AO P ARQUE - 9KM) ID000003 ID135 CW / OBRAS DE REC Component 3: Public Sect Request for Bid Single Stage - On 4,131,250. 2019-07- 2019-07- 2019-09- 2019-10- 2019-11- 2020-05 UPERAÇÃO DOS POSTOS D IBRD / 82760 Post Open - National 0.00 Canceled or Management s e Envelope 00 24 29 09 09 13 -11 E FISCALIZAÇÕES DO RN ID4 5.1 CW / REFORMA E A MPLIAÇÃO DA ESCOLA DO Component 2: Improving P Request for Bid Single Stage - On 439,210.4 263,249. Terminat 2019-08- 2019-10- 2019-09- 2019-10- 2019-07- 2019-11- 2019-10- 2019-12- 2019-04- 2020-06 IBRD / 82760 Post Open - National MITILA NORONHA NO MUN ublic Services s e Envelope 4 04 ed 30 14 04 16 19 15 14 20 17 -17 ICÍPIO DE SERRINHA, LOTE 7 DO ID4 5 CW ID137 CW / REESTRUTURA Under Im Component 3: Public Sect Request for Bid Single Stage - On 490,810.0 2019-10- 2019-12- 2019-10- 2021-05- 2019-12- 2022-04- 2020-01- 2022-06- 2020-02- 2020-08 ÇÃO DAS INSTALAÇÕES EL IBRD / 82760 Post Open - National 0.00 plementa or Management s e Envelope 9 22 03 27 13 08 07 07 14 11 -09 ÉTRICAS E DE TELECOMUNI tion CAÇÕES DA SEPLAN ID138 CW / CONSTRUÇÃO DE GALPÃO P/ ARMAZENA MENTO DE FORRAGENS, E M IPANGUASSU; CONSTRU ÇÃO DE CENTROS DE MAN Component 1: Sustainable Request for Bid Single Stage - On 341,882.0 136,283. 2019-11- 2020-02- 2019-11- 2020-03- 2019-12- 2020-09- 2020-01- 2020-11- 2020-02- 2021-04- 2020-08 IBRD / 82760 Post Open - National Signed EJO P/ CAPRINOS, EM CRUZ Regional Development s e Envelope 9 58 06 06 11 06 23 10 22 24 26 06 -24 ETA; E RECUPERAÇÃO DAS INSTALAÇÕES FÍSICAS, HID RÁULICAS E ELÉTRICAS DO CENTRO DE FORMAÇÃO DE INSEMINADORES NA ESTAÇ ÃO FELIPE CAMARÃO. ID4 7 1 CW / REFORMA E A MPLIAÇÃO DA ESCOLA PAD Component 2: Improving P Request for Bid Single Stage - On 683,518.3 482,680. 2019-11- 2020-03- 2019-11- 2020-03- 2020-01- 2020-05- 2020-02- 2021-01- 2020-03- 2021-02- 2020-09 IBRD / 82760 Post Open - National Signed RE BERNARDINO FERNAND ublic Services s e Envelope 6 89 20 02 25 20 06 07 05 18 11 18 -07 ES NO MUNICÍPIO DE MARC ELINO VIEIRA. ID136 CW / COMPLEMENT AÇÃO DOS SERVIÇOS DAS CENTRAIS DO CIDADÃO DO Component 3: Public Sect Request for Bid Single Stage - On 1,592,439. 935,405. 2019-11- 2020-01- 2019-12- 2020-03- 2020-01- 2020-05- 2020-02- 2020-07- 2020-03- 2020-08- 2020-09 IBRD / 82760 Post Open - National Signed MUNICÍPIO DE NOVA CRUZ/ or Management s e Envelope 81 66 26 21 01 06 12 08 11 07 17 12 -13 RN, DO MUNICÍPIO DE MAC AÍBA/RN E DA ZONA SUL D O MUNICÍPIO DE NATAL/RN ID102 1 CW / SERVIÇOS C Component 3: Public Sect Request for Quo Single Stage - On 187,500.0 147,470. Terminat 2019-12- 2018-08- 2020-02- 2017-11- 2020-08 OMPLEMENTARES A OBRA IBRD / 82760 Post Limited or Management tations e Envelope 0 87 ed 10 20 04 09 -02 DA CENTRAL DO CIDADÃO DA ZONA SUL ID46 2 1 CW / CONSTRUÇà O DE CENTRAIS DO CIDAD Component 3: Public Sect Request for Bid Single Stage - On 4,875,000. 3,327,07 Complete 2019-12- 2019-12- 2019-12- 2020-01- 2017-07- 2020-02- 2019-12- 2020-03- 2017-12- 2020-09 ÃO DO INTERIOR: SÃO PAU IBRD / 82760 Post Open - National or Management s e Envelope 00 6.23 d 05 12 10 21 20 20 16 26 05 -22 LO DO POTENGI, NOVA CR UZ, APODI, CEARA MIRIM, CARAÚBAS E JOÃO CÂMAR A ID139 CW / IMPLANTAÇÃO Component 1: Sustainable Request for Bid Single Stage - On 691,759.9 245,252. 2020-02- 2020-03- 2020-03- 2020-07- 2020-04- 2020-10- 2020-05- 2020-10- 2020-06- 2020-12- 2020-12 DE SINALIZAÇÃO TURÍSTIC IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 4 72 28 06 04 24 15 02 15 23 19 31 -16 A NO POLO COSTA BRANC A, RN ID140 CW / FINALIZAÇÃO DAS OBRAS DE RECUPERA Component 1: Sustainable 514,211.1 2020-03- 2020-03- 2020-05- 2020-10 IBRD / 82760 Post Direct Selection Direct 0.00 Canceled ÇÃO DO CANAL DE IRRIGA Regional Development 6 24 29 03 -30 ÇÃO OSVALDO AMORIM ID116 CW-2 / OBRAS DE R Component 3: Public Sect Request for Bid Single Stage - On 1,303,986. 854,736. 2020-06- 2018-07- 2020-06- 2020-07- 2018-08- 2020-08- 2018-08- 2020-09- 2018-09- 2021-03 ESTAURAÇÃO DO FORTE D IBRD / 82760 Post Open - National Signed or Management s e Envelope 91 30 03 09 08 20 08 19 23 23 29 -22 OS REIS MAGOS ID142 CW / IMPLANTAÇÃO Component 1: Sustainable Request for Bid Single Stage - On 457,229.6 505,827. 2020-08- 2020-09- 2020-08- 2020-08- 2020-09- 2020-11- 2020-10- 2021-01- 2020-11- 2021-04- 2021-05 DE CAIXA CÊNICA DO TEAT IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 5 74 02 25 07 14 18 03 18 11 22 27 -21 RO ALBERTO MARANHÃO – TAM ID144 CW / CONSTRUÇÃO DE SUB-ADUTORA PARA AB Component 1: Sustainable Request for Bid Single Stage - On 242,775.2 222,508. 2020-08- 2021-10- 2020-08- 2021-10- 2020-09- 2021-11- 2020-10- 2021-12- 2020-11- 2022-02- 2021-05 ASTECIMENTO DE ÁGUA D IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 6 02 02 08 07 21 18 25 18 28 22 12 -21 O PARQUE CIENTÍFICO E TE CNOLÓGICO DO RN AUGUS TO SEVERO ID145 CW / OBRAS E SERV IÇOS RELATIVOS A PROJET OS COMPLEMENTARES DE Component 1: Sustainable Request for Quo Single Stage - On 96,968.4 2020-08- 2020-10- 2021-05- 2021-03 IBRD / 82760 Post Open - National 71,956.95 Signed CLIMATIZAÇÃO, ACESSIBILI Regional Development tations e Envelope 8 07 02 05 -31 DADE, COMBATE A INCÊND IO E SUBESTAÇÃO DA BIBLI OTECA CÂMARA CASCUDO ID146 CW / OBRA DE REF Component 1: Sustainable Request for Bid Single Stage - On 191,570.8 192,181. 2020-08- 2020-08- 2020-08- 2020-09- 2020-09- 2020-12- 2020-10- 2021-02- 2020-11- 2021-03- 2021-05 IBRD / 82760 Post Open - National Signed ORMA DO POSTO FISCAL D Regional Development s e Envelope 8 06 02 28 07 29 18 23 18 26 22 15 -21 E PASSA E FICA ID148 CW / COMPLEMENT AÇÃO E RECUPERAÇÃO DA Component 1: Sustainable Request for Bid Single Stage - On 291,317.1 778,910. 2020-08- 2022-02- 2020-08- 2022-02- 2020-09- 2022-04- 2020-10- 2022-05- 2020-11- 2022-06- 2021-05 INFRAESTRUTURA DO CAN IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 5 09 02 04 07 22 18 07 18 31 22 23 -21 AL DE IRRIGAÇÃO OSVALD O AMORIM (PROJETO BAIX O AÇU – DIBA) ID149 CW / OBRA DE REC Component 1: Sustainable Request for Bid Single Stage - On 1,917,722. 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- 2021-05 IBRD / 82760 Prior Open - National 0.00 Canceled UPERAÇÃO DA BARRAGEM Regional Development s e Envelope 15 02 07 18 18 22 -21 DE PATAXÓ 382713/2016-5 CW / INST ALAÇÃO DE PLACAS DE SIN Under Im Component 1: Sustainable Request for Bid Single Stage - On 1,210,970. 2017-09- 2017-04- 2017-09- 2017-10- 2017-10- 2017-11- 2017-11- 2017-12- 2018-06 ALIZAÇÃO TURÍSTICA NOS IBRD / 82760 Post Open - National 0.00 plementa Regional Development s e Envelope 00 01 11 06 18 04 17 27 22 -20 POLOS TURÍSTICO COSTA B tion RANCA, SERIDO, AGRESTE/ TRAIRI E SERRANO ID4 5 2 CW / REFORMA E A MPLIAÇÃO DA ESCOLA DO Component 2: Improving P Request for Bid Single Stage - On 439,210.4 312,702. 2019-10- 2018-09- 2019-10- 2019-11- 2018-10- 2019-12- 2019-10- 2020-02- 2020-08- 2020-08 IBRD / 82760 Post Open - National Signed MITILA NORONHA NO MUNI ublic Services s e Envelope 4 89 14 06 19 30 11 30 17 03 11 -01 CÍPIO DE SERRINHA, LOTE 7 DO ID4 5 CW ID141 CW / SERVIÇOS CO Component 3: Public Sect Request for Quo Single Stage - On 117,379.7 2020-05- 2020-07- 2020-12 MPLEMENTARES DA BIBLIO IBRD / 82760 Post Limited 0.00 Canceled or Management tations e Envelope 7 09 04 -31 TECA CÂMARA CASCUDO ID147 CW / OBRA DE REES Component 1: Sustainable Request for Bid Single Stage - On 1,940,671. 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- 2021-05 TRUTURAÇÃO DO POSTO FI IBRD / 82760 Prior Open - National 0.00 Canceled Regional Development s e Envelope 34 02 07 18 18 22 -21 SCAL DE CARAÚ ID151 CW / OBRA DE INFR AESTRUTURA PARA IMPLAN Component 1: Sustainable Request for Quo Single Stage - On 188,398.8 2020-12- 2021-01- 2021-03 IBRD / 82760 Post Open - National 0.00 Canceled TAÇÃO DE SISTEMA DE DE Regional Development tations e Envelope 9 23 15 -26 SSALINIZAÇÃO DE ÁGUAS SALOBRAS ID147 CW-1 / OBRA DE RE Component 1: Sustainable Request for Bid Single Stage - On 1,940,671. 3,130,20 2020-08- 2020-08- 2020-09- 2020-10- 2020-10- 2020-12- 2020-11- 2021-03- 2021-05- 2021-09 ESTRUTURAÇÃO DO POSTO IBRD / 82760 Post Open - National Signed Regional Development s e Envelope 34 6.93 02 28 01 02 13 01 25 05 08 -01 FISCAL DE CARAÚ ID152 CW / OBRA DE ENG ENHARIA PARA ETAPAS RE Component 3: Public Sect Request for Quo Single Stage - On 141,946.3 175,647. 2021-02- 2021-04- 2021-06- 2021-10 MANESCENTES RELATIVAS IBRD / 82760 Post Open - National Signed or Management tations e Envelope 8 75 24 21 17 -18 A EDIFICAÇÃO DA CENTRA L DO CIDADÃO DA ZONA N ORTE ID138 2 CW / CONSTRUÇà O DE CENTROS DE MANEJO P/ CAPRINOS EM CRUZETA; Component 1: Sustainable Request for Quo Single Stage - On 126,633.7 94,160.7 2020-11- 2021-01- 2021-09- 2021-07 E RECUPERAÇÃO DAS INST IBRD / 82760 Post Open - National Signed Regional Development tations e Envelope 8 3 29 24 14 -23 ALAÇÕES FÍSICAS, HIDRÁU LICAS E ELÉTRICAS DO CE NTRO DE FORMAÇÃO DE IN SEMINADORES NA ESTAÇà O FELIPE CAMARÃO ID138 1 CW / CONSTRUÇà O DE CENTROS DE MANEJO P/ CAPRINOS, EM CRUZETA Component 1: Sustainable Request for Bid Single Stage - On 126,633.7 2020-11- 2020-11- 2021-01- 2021-02- 2021-03- 2021-09 ; E RECUPERAÇÃO DAS INS IBRD / 82760 Post Open - National 0.00 Canceled Regional Development s e Envelope 8 24 29 10 09 16 -12 TALAÇÕES FÍSICAS, HIDRÁ ULICAS E ELÉTRICAS DO CE NTRO DE FORMAÇÃO DE IN SEMINADORES NA ESTAÇà O FELIPE CAMARÃO. ID151 CW-1 / OBRA DE INF RAESTRUTURA PARA IMPLA Component 1: Sustainable Request for Bid Single Stage - On 263,303.9 208,686. 2021-03- 2021-03- 2021-03- 2021-04- 2021-04- 2021-05- 2021-05- 2021-07- 2021-06- 2021-07- 2021-09 IBRD / 82760 Post Open - National Signed NTAÇÃO DE SISTEMA DE D Regional Development s e Envelope 5 02 25 16 30 23 29 26 14 02 14 31 -12 ESSALINIZAÇÃO DE ÁGUAS SALOBRAS ID149 CW-1 / OBRA DE RE Component 1: Sustainable Request for Bid Single Stage - On 1,917,722. 2020-08- 2020-11- 2020-09- 2021-03- 2020-11- 2021-04- 2021-01- 2021-03- 2021-09 IBRD / 82760 Post Open - National 0.00 Canceled CUPERAÇÃO DA BARRAGE Regional Development s e Envelope 15 02 23 02 19 02 06 02 05 -01 M DE PATAXÓ National Procur ID149 CW-2 / OBRA DE RE Component 1: Sustainable Request for Bid Single Stage - On ement Docume 2,000,000. 2021-06- 2022-01- 2021-07- 2022-01- 2021-09- 2021-11- 2022-01- 2022-07 CUPERAÇÃO DA BARRAGE IBRD / 82760 Post Open - National 0.00 Canceled Regional Development s e Envelope nt - 1 Envelope 00 27 05 28 27 27 27 28 -27 M DE PATAXÓ process (Non B ank-SPD) ID154 CW / CONTRATAÇà O DE EMPRESA ESPECIALIZ Request for Qu ADA PARA A COMPLEMENT Component 1: Sustainable Request for Quo Single Stage - On 176,248.6 2021-07- 2021-09- 2022-03 IBRD / 82760 Post Open - National otations (Non B 0.00 Canceled AÇÃO DE ABASTECIMENTO Regional Development tations e Envelope 1 17 11 -10 ank-SPD) DE ÁGUA LOCALIZADAS EM COMUNIDADES RURAIS DA REGIÃO SERIDÓ ID155 CW / CONTRATAÇà O DE EMPRESA ESPECIALIZ ADA PARA A COMPLEMENT Request for Qu Component 1: Sustainable Request for Quo Single Stage - On 147,680.7 208,010. 2021-07- 2021-09- 2021-11- 2022-03 AÇÃO DE ABASTECIMENTO IBRD / 82760 Post Open - National otations (Non B Signed Regional Development tations e Envelope 7 87 17 11 19 -10 DE ÁGUA LOCALIZADAS EM ank-SPD) COMUNIDADES RURAIS DA S REGIÕES AÇU-MOSSORÓ, ALTO OESTE E SERTÃO DO APODI ID143 CW-1 / CONSTRUÇà National Procur O DE INFRAESTRUTURA PA ement Docume Component 2: Improving P Request for Bid Single Stage - On 494,652.8 779,650. 2021-07- 2021-09- 2021-07- 2021-10- 2021-08- 2021-11- 2021-09- 2022-01- 2021-11- 2022-02- 2022-05 RA FUNCIONAMENTO DO P IBRD / 82760 Post Open - National nt - 1 Envelope Signed ublic Services s e Envelope 0 59 14 27 19 15 30 19 29 20 03 08 -02 ARQUE CIENTÍFICO E TECN process (Non B OLÓGICO DO RIO GRANDE ank-SPD) DO NORTE, AUGUSTO SEV ERO (PAX) ID143 CW-2 / REFORMA D National Procur A ESCOLA LYGYA LAPORTA ement Docume Component 2: Improving P Request for Bid Single Stage - On 402,712.3 456,116. 2021-07- 2021-09- 2021-07- 2021-10- 2021-08- 2021-11- 2021-09- 2021-12- 2021-11- 2022-02- 2022-05 NO PARQUE CIENTÍFICO E T IBRD / 82760 Post Open - National nt - 1 Envelope Signed ublic Services s e Envelope 6 12 14 27 19 15 30 18 29 06 03 07 -02 ECNOLÓGICO DO RN, AUG process (Non B USTO SEVERO - PAX NO M ank-SPD) UNICÍPIO DE MACAÍBA/RN ID153 CW / CONTRATAÇà O DE EMPRESA ESPECIALIZ Request for Qu Component 1: Sustainable Request for Quo Single Stage - On 224,819. 2021-07- 2021-09- 2022-01- 2022-03 ADA PARA A COMPLEMENT IBRD / 82760 Post Open - National otations (Non B 97,203.68 Signed Regional Development tations e Envelope 63 17 11 28 -10 AÇÃO DAS OBRAS DE EDIFI ank-SPD) CAÇÕES LOCALIZADAS EM COMUNIDADES RURAIS ID156 CW / OBRA COMPLE Request for Qu MENTAR PARA ADEQUAÇÕ Component 3: Public Sect Request for Quo Single Stage - On 120,506.2 119,147. 2021-08- 2021-10- 2022-03- 2022-04 IBRD / 82760 Post Open - National otations (Non B Signed ES DE ACESSIBILIDADE E IL or Management tations e Envelope 1 73 09 04 24 -02 ank-SPD) UMINAÇÃO DO PALÁCIO D O GOVERNO - PINACOTECA ID143 CW / OBRAS DE REF ORMA DA ESCOLA LYGIA L APORTA E CONSTRUÇÃO D Component 2: Improving P Request for Bid Single Stage - On 902,522.4 2020-08- 2020-08- 2020-09- 2020-10- 2020-11- 2021-05 IBRD / 82760 Post Open - National 0.00 Canceled E INFRAESTRUTURA PARA ublic Services s e Envelope 4 02 07 18 18 22 -21 FUNCIONAMENTO DO PAR QUE CIENTÍFICO E TECNOL ÓGICO DO RN AUGUSTO S EVERO National Procur ID159 CW / OBRA DO HOS ement Docume Component 2: Improving P Request for Bid Single Stage - On 564,971.7 977,249. 2021-08- 2021-11- 2021-08- 2021-12- 2021-09- 2022-01- 2021-10- 2022-02- 2021-11- 2022-03- 2022-05 PITAL REGIONAL INÁCIO D IBRD / 82760 Post Open - National nt - 1 Envelope Signed ublic Services s e Envelope 5 92 05 24 10 09 21 12 21 03 25 07 -24 OS SANTOS - AÇÚ process (Non B ank-SPD) National Procur ID158 CW / OBRA DE REC Component 1: Sustainable Request for Bid Single Stage - On ement Docume 753,295.6 2021-08- 2021-08- 2021-10- 2021-11- 2021-12- 2022-06 UPERAÇÃO DA BARRAGEM IBRD / 82760 Post Open - National 0.00 Canceled Regional Development s e Envelope nt - 1 Envelope 7 18 23 04 03 08 -06 DE LUCRÉCIA process (Non B ank-SPD) National Procur ID157 CW / REFORMA DA ement Docume CENTRAL DO CIDADÃO DA Component 3: Public Sect Request for Bid Single Stage - On 433,145.0 315,694. 2021-08- 2021-10- 2021-08- 2021-10- 2021-10- 2021-11- 2021-11- 2021-11- 2021-12- 2021-12- 2022-06 IBRD / 82760 Post Open - National nt - 1 Envelope Signed RODOVIÁRIA – NATAL – ZO or Management s e Envelope 0 58 18 04 23 06 04 09 03 23 08 07 -06 process (Non B NA OESTE – SERVIÇOS CO ank-SPD) MPLEMENTARES National Procur ID160 CW / REFORMA E A ement Docume Component 2: Improving P Request for Bid Single Stage - On 470,809.7 603,585. 2021-08- 2022-02- 2021-08- 2022-02- 2021-10- 2022-04- 2021-11- 2022-05- 2021-12- 2022-05- 2022-06 MPLIAÇÃO DA ESCOLA EST IBRD / 82760 Post Open - National nt - 1 Envelope Signed ublic Services s e Envelope 9 20 18 15 23 21 04 06 03 16 08 24 -06 ADUAL DES. VICENTE LEM process (Non B OS ank-SPD) ID161 CW / OBRAS PARA R Request for Qu Under Im ESTAURAÇÃO DOS ADORN Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05 IBRD / 82760 Post Open - National otations (Non B 34,677.55 0.00 plementa OS DA FACHADA DO TEATR or Management tations e Envelope 07 02 -01 ank-SPD) tion O ALBERTO MARANHÃO ID162 CW / SERVIÇOS DE National Procur ENGENHARIA NECESSÁRIO ement Docume Component 2: Improving P Request for Quo Single Stage - On 120,284.1 134,124. 2021-09- 2021-11- 2022-02- 2022-05 S AO LICENCIAMENTO E RE IBRD / 82760 Post Open - National nt - 1 Envelope Signed ublic Services tations e Envelope 7 60 22 17 09 -16 GULARIZAÇÕES DAS OBRA process (Non B S ESTRUTURANTES – BLOC ank-SPD) O I (REGIONAL NATAL) Page 2 ID163 CW / SERVIÇOS DE National Procur ENGENHARIA NECESSÁRIO ement Docume Component 2: Improving P Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05 S AO LICENCIAMENTO E RE IBRD / 82760 Post Open - National nt - 1 Envelope 51,265.77 0.00 Signed ublic Services tations e Envelope 22 17 -16 GULARIZAÇÕES DAS OBRA process (Non B S ESTRUTURANTES – BLOC ank-SPD) O II (REGIONAL MATO GRA NDE) ID164 CW / SERVIÇOS DE National Procur ENGENHARIA NECESSÁRIO ement Docume Under Im Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05 S AO LICENCIAMENTO E RE IBRD / 82760 Post Open - National nt - 1 Envelope 51,186.84 0.00 plementa or Management tations e Envelope 22 17 -16 GULARIZAÇÕES DAS OBRA process (Non B tion S ESTRUTURANTES – BLOC ank-SPD) O III (REGIONAL METROPOL ITANA) ID167 CW / SERVIÇOS DE National Procur ENGENHARIA NECESSÁRIO ement Docume Component 2: Improving P Request for Quo Single Stage - On 14,293.2 2021-09- 2021-11- 2022-02- 2022-05 S AO LICENCIAMENTO E RE IBRD / 82760 Post Open - National nt - 1 Envelope 13,466.78 Signed ublic Services tations e Envelope 6 22 17 12 -16 GULARIZAÇÕES DAS OBRA process (Non B S ESTRUTURANTES – BLOC ank-SPD) O VI (REGIONAL ALTO OES TE) ID168 CW / SERVIÇOS DE National Procur ENGENHARIA NECESSÁRIO ement Docume Component 3: Public Sect Request for Quo Single Stage - On Complete 2021-09- 2021-11- 2022-05 S AO LICENCIAMENTO E RE IBRD / 82760 Post Open - National nt - 1 Envelope 43,447.61 0.00 or Management tations e Envelope d 22 17 -16 GULARIZAÇÕES DAS OBRA process (Non B S ESTRUTURANTES – BLOC ank-SPD) O VII (REGIONAL SERIDÓ) ID170 CW / OBRA DE CON National Procur STRUÇÃO DA ESTAÇÃO ELE ement Docume Component 2: Improving P Request for Quo Single Stage - On 193,116.2 177,966. 2021-10- 2021-12- 2022-01- 2022-06 VATÓRIA DE ESGOTO COM IBRD / 82760 Post Open - National nt - 1 Envelope Signed ublic Services tations e Envelope 9 18 10 05 26 -03 EMISSÁRIO E REDE PARA H process (Non B IDRANTE DO HOSPITAL DA ank-SPD) MULHER EM MOSSORÓ/RN Request for Bid ID172 CW / OBRA DE REST Under Im Component 1: Sustainable Request for Bid Single Stage - On s - Works SPD ( 14,124,29 2021-09- 2021-12- 2021-10- 2021-12- 2021-11- 2022-01- 2021-12- 2022-01- 2022-01- 2022-07 AURAÇÃO E ALARGAMENT IBRD / 82760 Prior Open - National 0.00 plementa Regional Development s e Envelope after prequalific 3.78 27 02 02 07 13 11 13 25 17 -16 O DA ESTRADA RN-233 tion ation) ID166 CW / SERVIÇOS DE National Procur ENGENHARIA NECESSÁRIO ement Docume Component 3: Public Sect Request for Quo Single Stage - On 52,691.7 2021-09- 2021-11- 2022-05- 2022-05 S AO LICENCIAMENTO E RE IBRD / 82760 Post Open - National nt - 1 Envelope 45,960.82 Signed or Management tations e Envelope 9 22 17 08 -16 GULARIZAÇÕES DAS OBRA process (Non B S ESTRUTURANTES – BLOC ank-SPD) O V (REGIONAL ASSU) ID165 CW / SERVIÇOS DE National Procur ENGENHARIA NECESSÁRIO ement Docume Component 3: Public Sect Request for Quo Single Stage - On 30,470.8 2021-09- 2021-11- 2022-05- 2022-05 S AO LICENCIAMENTO E RE IBRD / 82760 Post Open - National nt - 1 Envelope 25,214.12 Signed or Management tations e Envelope 0 22 17 10 -16 GULARIZAÇÕES DAS OBRA process (Non B S ESTRUTURANTES – BLOC ank-SPD) O IV (REGIONAL MOSSORÓ ) National Procur ID173 CW / OBRA DE PERF ement Docume URAÇÃO E INSTALAÇÃO DE Component 1: Sustainable Request for Quo Single Stage - On 188,323.9 200,663. 2021-11- 2022-01- 2022-04- 2022-07 IBRD / 82760 Post Open - National nt - 1 Envelope Signed POÇOS ARTESIANOS EM C Regional Development tations e Envelope 2 20 15 10 29 -09 process (Non B OMUNIDADES RURAIS ank-SPD) ID174 CW / SERVIÇOS DE National Procur ENGENHARIA NECESSÁRIO ement Docume Under Im Component 2: Improving P Request for Quo Single Stage - On 188,233.9 2021-12- 2022-01- 2022-07 S AO LICENCIAMENTO E RE IBRD / 82760 Post Open - National nt - 1 Envelope 0.00 plementa ublic Services tations e Envelope 0 04 29 -28 GULARIZAÇÕES DO LABOR process (Non B tion ATÓRIO DE ANATOHISTOPA ank-SPD) TOLOGIA National Procur ID175 CW / SERVIÇOS DE ement Docume Component 3: Public Sect Request for Quo Single Stage - On 112,994.3 100,111. 2021-12- 2022-02- 2022-03- 2022-07 ENGENHARIA NO PRÉDIO D IBRD / 82760 Post Open - National nt - 1 Envelope Signed or Management tations e Envelope 5 72 07 01 15 -31 A SEPLAN E CONTROL process (Non B ank-SPD) National Procur ID176 CW / OBRA DE DRE ement Docume Under Im Component 2: Improving P Request for Quo Single Stage - On 207,549.4 2021-12- 2022-02- 2022-08 NAGEM EXTERNA DO HOSP IBRD / 82760 Post Open - National nt - 1 Envelope 0.00 plementa ublic Services tations e Envelope 1 20 14 -13 ITAL DA MULHER process (Non B tion ank-SPD) National Procur ID177 CW / SERVIÇOS CO ement Docume Under Im Component 2: Improving P Request for Quo Single Stage - On 2021-12- 2022-02- 2022-08 MPLEMENTARES DE ADEQU IBRD / 82760 Post Open - National nt - 1 Envelope 94,707.21 0.00 plementa ublic Services tations e Envelope 20 14 -13 AÇÃO DO SISTEMA DE COM process (Non B tion BATE À INCENDIO ank-SPD) National Procur ID178 CW / CONTRATAÇà ement Docume Component 1: Sustainable 2,448,210. 3,331,35 2021-12- 2022-02- 2021-12- 2022-02- 2022-01- 2022-03- 2022-07 O DIRETA PARA OBRA DE R IBRD / 82760 Post Direct Selection Direct nt - 1 Envelope Signed Regional Development 92 6.43 16 09 21 09 25 26 -24 ECUPERAÇÃO DA BARRAGE process (Non B M DE LUCRÉCIA ank-SPD) National Procur ID 190 CW / OBRAS DA MA ement Docume Under Im Component 2: Improving P Request for Quo Single Stage - On 103,578.1 2022-02- 2022-04- 2022-07 RQUISE E CASA DE LIXO D IBRD / 82760 Post Open - National nt - 1 Envelope 0.00 plementa ublic Services tations e Envelope 5 21 21 -20 O HOSPITAL DA MULHER process (Non B tion ank-SPD) National Procur ID 191 CW / OBRAS PARA ement Docume Component 1: Sustainable Request for Quo Single Stage - On 30,328.0 2022-02- 2022-04- 2022-05- 2022-10 OS INVESTIMENTOS EM CO IBRD / 82760 Post Open - National nt - 1 Envelope 28,673.30 Signed Regional Development tations e Envelope 1 12 09 19 -06 MUNIDADES RURAIS - REGI process (Non B ÃO NORTE ank-SPD) National Procur ID 192 CW / OBRAS PARA ement Docume Component 1: Sustainable Request for Quo Single Stage - On 48,570.8 2022-02- 2022-04- 2022-05- 2022-10 OS INVESTIMENTOS EM CO IBRD / 82760 Post Open - National nt - 1 Envelope 29,208.56 Signed Regional Development tations e Envelope 2 12 09 17 -06 MUNIDADES RURAIS - REGI process (Non B ÃO OESTE ank-SPD) National Procur ID193 CW / SERVIÇOS CO ement Docume MPLEMENTARES DA ESCOL Component 2: Improving P Request for Quo Single Stage - On 66,488.9 2022-02- 2022-04- 2022-05- 2022-10 IBRD / 82760 Post Open - National nt - 1 Envelope 53,133.52 Signed A ESTADUAL 11 DE AGOST ublic Services tations e Envelope 0 15 12 12 -09 process (Non B O, LOCALIZADA EM UMARI ank-SPD) ZAL/RN ID154 CW-1 / CONTRATAÇ ÃO DE EMPRESA ESPECIALI Request for Qu ZADA PARA A COMPLEMEN Component 1: Sustainable Request for Quo Single Stage - On 224,000.0 2022-04- 2022-05- 2022-11 IBRD / 82760 Post Open - National otations (Non B 0.00 Canceled TAÇÃO DE ABASTECIMENT Regional Development tations e Envelope 0 02 28 -24 ank-SPD) O DE ÁGUA LOCALIZADAS EM COMUNIDADES RURAIS DA REGIÃO SERIDÓ ID154 CW-2 / CONTRATAÇ National Procur ÃO DE EMPRESA ESPECIALI ement Docume Under Im ZADA PARA A COMPLEMEN Component 1: Sustainable Request for Bid Single Stage - On 224,000.0 2022-05- 2022-05- 2022-05- 2022-06- 2022-07- 2022-06- 2022-08- 2022-07- 2022-11 IBRD / 82760 Post Open - National nt - 1 Envelope 0.00 plementa TAÇÃO DE ABASTECIMENT Regional Development s e Envelope 0 03 19 08 07 12 22 03 27 -24 process (Non B tion O DE ÁGUA LOCALIZADAS ank-SPD) EM COMUNIDADES RURAIS DA REGIÃO SERIDÓ ID179 CW / CONTRATAÇà O DE EMPRESA ESPECIALIZ National Procur ADA NA ÁREA DE ENGENH ement Docume Under Im ARIA CIVIL PARA EXECUÇà Component 2: Improving P Request for Quo Single Stage - On 185,942.2 2022-07- 2022-08- 2022-11 IBRD / 82760 Post Open - National nt - 1 Envelope 0.00 plementa O DAS OBRAS DE ESTRUTU ublic Services tations e Envelope 3 02 27 -25 process (Non B tion RAÇÃO DAS FACHADAS E I ank-SPD) NSTALAÇÃO CONDICIONAD O DO HOSPITAL NELSON IN ÁCIO DOS SANTOS EM ASS U/RN ID180 CW / SERVIÇO DE A DAPTAÇÃO DA MEDIÇÃO E National Procur M MÚLTIPLAS UNIDADES D ement Docume Under Im Component 3: Public Sect Request for Quo Single Stage - On 2023-05- 2023-07- 2023-11 E CONSUMO DA SUBESTAÇ IBRD / 82760 Post Open - National nt - 1 Envelope 50,581.63 0.00 plementa or Management tations e Envelope 16 11 -08 ÃO DO TERMINAL RODOVIÁ process (Non B tion RIO DE NATAL E INSTALAÇ ank-SPD) ÃO DO RAMAL ALIMENTAD OR DA CENTRAL DO CIDAD ÃO National Procur ID181 CW / LEGALIZAÇÃO ement Docume Pending I E EXECUÇÃO DOS SISTEMA Component 1: Sustainable Request for Quo Single Stage - On 2023-05- 2023-07- 2023-11 IBRD / 82760 Post Open - National nt - 1 Envelope 13,184.59 0.00 mplemen S DE PROTEÇÃO CONTRA I Regional Development tations e Envelope 16 11 -08 process (Non B tation NCÊNDIO DO FORTE DOS R ank-SPD) EIS MAGOS National Procur ID182 CW / ADEQUAÇÃO D ement Docume Pending I Component 1: Sustainable Request for Quo Single Stage - On 2023-05- 2023-07- 2023-11 O SISTEMA DE ESGOTO DO IBRD / 82760 Post Open - National nt - 1 Envelope 24,340.78 0.00 mplemen Regional Development tations e Envelope 16 11 -08 PRÉDIO DO SINE/RN process (Non B tation ank-SPD) National Procur ID183 CW / ADEQUAÇÕES ement Docume Pending I Component 1: Sustainable Request for Quo Single Stage - On 2023-05- 2023-07- 2023-11 DE ACESSIBILIDADE DO PR IBRD / 82760 Post Open - National nt - 1 Envelope 58,823.53 0.00 mplemen Regional Development tations e Envelope 16 11 -08 ÉDIO DA PINACOTECA DO process (Non B tation ESTADO/RN ank-SPD) GOODS Activity Reference No. Specific Procureme Proposal Submissio Bid Evaluation Rep Loan / Credit Market Appro Procurement P Prequalificati Estimated A Actual Amou Process Draft Pre-qualificati Prequalification Eva Draft Bidding Docu Bidding Documents Contract Completio / Description Component Review Type Method nt Notice / Invitatio n / Opening / Minut ort and Recommen Signed Contract No. ach rocess on (Y/N) mount (US$) nt (US$) Status on Documents luation Report ment / Justification as Issued n n es dation for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 362169/2016-8 / EQUIPAM Component 2: Improving P 2014-10- 2014-12- 2018-08- 2015-02- 2018-08- 2015-08- ENTOS PARA O FORTALECI IBRD / 82760 Prior E-Auctions Limited 3,428,571.00 1,789,523.74 Signed ublic Services 30 29 10 12 28 11 MENTO DO SISTEMA DE VI DEOMONITORAMENTO 388142/2016-6 / ACORDO Component 1: Sustainable 2016-12- 2017-02- 2018-02- 2017-04- 2018-07- 2018-03- MARCO DE MOBILIARIOS P IBRD / 82760 Prior E-Auctions Limited 4,625,000.00 1,149,466.17 Signed Regional Development 20 18 07 04 10 30 ARA OS INVESTIMENTOS D O PROJETO ID17 GO / EQUIPAMENTOS / MOBILIARIOS PARA AS ES Component 2: Improving P 2017-06- 2017-06- 2017-07- 2017-09- IBRD / 82760 Prior E-Auctions Limited 2,159,091.00 0.00 Canceled COLAS, DE ACORDO COM ublic Services 09 14 29 27 OS PADROES MINIMOS DEF INIDOS (2ª ETAPA) ID3 GO / AQUISICAO DE E QUIPAMENTOS ESPECIAIS P ARA ESTRUTURACAO DO L ABORATORIO DE INSPECAO Component 1: Sustainable 2017-11- 2017-11- 2018-01- 2018-02- IBRD / 82760 Post E-Auctions Open 919,236.66 0.00 Canceled DE PRODUTOS DE ORIGEM Regional Development 10 15 26 25 ANIMAL E DE SANIDADE AP ICOLA, A SER CONSTRUIDO NA UNIVERSIDADE FEDERA L RURAL DO SEMIARIDO - U FERSA EM MOSSORO/RN. ID33 2GO / AQUISICAO DE Component 2: Improving P 2017-06- 2017-06- 2017-08- 2017-10- MOBILIARIO E EQUIPAMENT IBRD / 82760 Prior E-Auctions Open 2,800,000.00 0.00 Canceled ublic Services 09 14 10 09 OS PARA O ORGAO CENTR AL DA SEEC E DIRED'S ID51 GO / EQUIPAMENTO E Component 1: Sustainable 2017-05- 2017-05- 2017-07- 2017-09- IBRD / 82760 Post E-Auctions Limited 214,724.00 0.00 Canceled MOBILIARIOS PARA ESCOL Regional Development 05 10 06 04 A DO ARTESAO ID57 GO / EQUIPAMENTOS Component 3: Public Sect Request for Bid Single Stage - On 2017-08- 2017-08- 2017-08- 2017-09- 2017-11- 2017-12- IBRD / 82760 Post Open - National 125,000.00 0.00 Canceled PARA ESTRUTURACAO DO or Management s e Envelope 04 04 09 20 04 04 SINE ID60 GO / AQUISICAO DE V EICULOS TIPO FURGAO AD Component 2: Improving P 2017-05- 2017-05- 2018-08- 2017-07- 2017-07- 2017-10- 2018-10- IBRD / 82760 Post E-Auctions Limited 1,714,285.00 832,437.63 Completed APTADO PARA BASE COMU ublic Services 05 10 27 06 18 04 23 NITARIA MOVEL - RONDA C IDADA ID79 GO / AQUISICAO DE L Component 3: Public Sect 2017-04- 2017-04- 2017-11- 2017-06- 2017-11- 2018-06- IBRD / 82760 Prior E-Auctions Open 3,125,000.00 2,758,362.15 Signed ICENCAS DE BANCO DE DA or Management 21 26 23 22 29 17 DOS ORACLE ID8 GO / EQUIPAMENTOS MEDICO-HOSPITALARES PA Component 2: Improving P 2017-07- 2017-09- 2017-10- 2018-01- IBRD / 82760 Post E-Auctions Open 215,278.00 0.00 Canceled RA O LABORATORIO DE RE ublic Services 13 11 01 29 FERENCIA ESTADUAL DE A NATOMOHISTOCITOPATOL OGIA ID80 GO / AQUISICAO DE S Component 3: Public Sect 2017-06- 2017-06- 2017-08- 2017-11- IBRD / 82760 Prior E-Auctions Open 4,200,000.00 0.00 Canceled ISTEMA DE GESTAO DE RH or Management 09 14 10 08 ID81 GO / AQUISICAO DE E QUIPAMENTOS PARA MODE Under Impl Component 3: Public Sect 2017-05- 2017-05- 2017-07- 2017-10- RNIZACAO DA COORDENA IBRD / 82760 Post E-Auctions Limited 417,766.00 0.00 ementatio or Management 12 17 28 26 CAO DO PATRIMONIO PUBL n ICO DO ESTADO DO RN - LI CITACAO COMPLEMENTAR ID82 GO / AQUISICAO DE P ACOTE DE METODOS PARA Component 1: Sustainable Request for Quo Single Stage - On 2017-05- 2017-09- 2017-12- IBRD / 82760 Post Open - National 11,873.07 0.00 Canceled ESPECTROMETRO DE MASS Regional Development tations e Envelope 26 10 09 AS TRIPLO QUADRUPOLO ID83 GO / AQUISICAO DE E QUIPAMENTOS DE RAIO X E Component 1: Sustainable Request for Bid Single Stage - On 2017-03- 2018-06- 2017-03- 2017-03- 2018-06- 2017-05- 2018-06- 2017-06- 2017-07- 2017-09- 2017-09- IBRD / 82760 Post Open - National 89,000.00 21,059.74 Completed DECTACAO DE METAIS PAR Regional Development s e Envelope 20 01 20 20 04 01 05 15 13 13 22 A AEROPORTO DE MOSSOR O ID84 GO / AQUISICAO E IN Component 1: Sustainable Request for Bid Single Stage - On 2017-03- 2017-04- 2017-04- 2017-05- 2017-05- 2017-07- STALACAO DE SERVICO DE IBRD / 82760 Post Open - National 10,000.00 0.00 Canceled Regional Development s e Envelope 20 19 29 09 24 23 AUDIO E VIDEO PARA AERO PORTO DE MOSSORO ID9 GO / AQUISICAO DE E QUIPAMENTOS MEDICO-HO Component 2: Improving P 2017-08- 2017-08- 2017-10- 2018-02- SPITALARES PARA ESTRUT IBRD / 82760 Prior E-Auctions Open 2,346,991.00 0.00 Canceled ublic Services 04 09 20 17 URACAO DE CENTROS DE REFERENCIA DE ATENCAO À MULHER EM ONCOLOGIA ID85 GO / AQUISICAO DE Component 1: Sustainable 2017-05- 2020-03- 2017-06- 2017-07- 2020-03- 2017-08- 2020-03- 2017-09- 2016-12- 2017-11- 2017-07- UNIDADE MOVEIS DE FISCA IBRD / 82760 Post E-Auctions Open 170,000.00 93,274.32 Completed Regional Development 30 02 04 16 02 15 03 19 13 18 27 LIZACAO AGROPECUARIA ID15 GO / EQUIPAMENTOS DOS HOSPITAIS REGIONAIS Component 2: Improving P 2017-07- 2017-08- 2017-09- 2018-03- IBRD / 82760 Prior E-Auctions Open 9,363,636.00 0.00 Canceled DE URGENCIA E EMERGEN ublic Services 14 02 06 05 CIA E HOSPITAIS GERAIS ID13 GO / EQUIPAMENTOS DOS HOSPITAIS REGIONAIS Component 2: Improving P 2017-08- 2017-09- 2017-10- 2018-04- IBRD / 82760 Prior E-Auctions Open 1,454,545.00 0.00 Canceled DE URGENCIA E EMERGEN ublic Services 30 18 23 21 CIA E HOSPITAIS GERAIS (1 ETAPA) ID16 GO / EQUIPAMENTOS E MOBILIARIOS PARA AS ES Component 2: Improving P 2017-07- 2017-07- 2017-08- 2017-11- IBRD / 82760 Prior E-Auctions Open 2,159,091.00 0.00 Canceled COLAS, DE ACORDO COM ublic Services 03 22 26 24 OS PADROES MINIMOS DEF INIDOS ID12 GO / EQUIPAMENTOS MEDICO-HOSPITALARES PA Component 2: Improving P 2017-05- 2017-06- 2017-11- 2017-07- 2018-03- 2018-01- 2018-08- RA MATERNIDADES FILANT IBRD / 82760 Post E-Auctions Open 490,003.00 7,180.86 Signed ublic Services 29 17 30 22 19 18 15 ROPICAS, ESTADUAIS E MU NICIPAIS (8 ITENS PARA RE LICITACAO) ID33 1GO / AQUISICAO DE Component 2: Improving P 2017-05- 2017-05- 2018-11- 2017-07- 2019-09- 2017-09- 2020-02- IBRD / 82760 Post E-Auctions Open 625,000.00 166,518.71 Signed MOBILIARIO PARA A SESAP ublic Services 19 24 06 20 12 18 07 181242/2015-3 / AQUISIÇà Component 3: Public Sect 2017-06- 2017-06- 2017-07- 2018-12- O E IMPLANTAÇÃO DE SIST IBRD / 82760 Prior E-Auctions Open 2,045,455.00 0.00 Canceled or Management 01 20 25 27 EMA INTEGRADO DE GEST ÃO 218431/2015-3 / AQUISIÇà Component 2: Improving P Pending Im 2017-06- 2017-06- 2017-07- 2018-01- IBRD / 82760 Prior E-Auctions Open 2,559,591.00 0.00 O DO DATACENTER PARA A ublic Services plementati 01 20 25 21 SESED on 338654/2016-1 / AQUISICA Component 3: Public Sect 2016-10- 2016-11- 2017-01- 2017-04- O E INSTALACAO DE CONT IBRD / 82760 Prior E-Auctions Open 2,500,000.00 0.00 Canceled or Management 28 02 13 13 AINER PARA DATACENTER ID87GO / EQUIPAMENTOS Component 3: Public Sect Request for Quo Single Stage - On 2017-07- 2018-06- 2017-09- 2018-01- 2017-12- 2018-05- PARA ESTRUTURAÇÃO DA IBRD / 82760 Post Limited 27,000.00 28,159.78 Completed or Management tations e Envelope 24 01 18 26 17 16 CENTRAL DO CIDADO DE P ARELHAS 31797/2016-8 / AQUISIÇà O DE APPLIANCE DE INFRA Component 3: Public Sect 2017-06- 2017-06- 2017-07- 2018-07- IBRD / 82760 Prior E-Auctions Open 3,929,949.00 0.00 Canceled ESTRUTURA INTEGRADA (D or Management 01 20 25 20 ATACENTER) PARA A SEPLA N ID3 3 GO / AQUISIÇÃO DE EQUIPAMENTO ESPECIAL P Component 1: Sustainable 2017-08- 2020-01- 2017-08- 2021-05- 2017-09- 2022-09- 2017-12- IBRD / 82760 Post Direct Selection Direct 216,636.00 181,148.02 Completed ARA QUALIDADE DO LEITE Regional Development 09 20 14 14 18 16 17 PARA ESTRUTURAÇÃO DO LABOLEITE DA UFRN ID3 1 GO / AQUISIÇÃO DE EQUIPAMENTOS EXCLUSIV Component 1: Sustainable 2017-08- 2017-08- 2017-09- 2017-12- OS DE ANÁLISE MICROBIOL IBRD / 82760 Post Direct Selection Direct 147,191.25 0.00 Canceled Regional Development 09 14 18 17 ÓGICA DE ALIMENTOS PAR A ESTRUTURAÇÃO DO LAB ORATÓRIO DA UFERSA E L ACEN ID3 2 GO / AQUISIÇÃO DE EQUIPAMENTO ESPECIAL P Component 1: Sustainable 2017-08- 2017-08- 2017-09- 2017-12- ARA INSPEÇÃO DE PRODUT IBRD / 82760 Post Direct Selection Direct 163,016.25 0.00 Canceled Regional Development 09 14 18 17 OS DE ORIGEM ANIMAL PA RA ESTRUTURAÇÃO DO LA BORATÓRIO DA UFERSA ID86G0 / MOBILIARIOS PA Component 3: Public Sect Request for Quo Single Stage - On 2017-07- 2018-06- 2017-09- 2017-11- 2017-12- 2018-02- RA ESTRUTURACAO DA CE IBRD / 82760 Post Limited 75,000.00 23,887.09 Completed or Management tations e Envelope 24 04 18 11 17 10 NTRAL DO CIDADAO DE PA RELHAS ID88 GO / AQUISIÇÃO DE V Component 2: Improving P Terminate 2017-09- 2017-09- 2018-08- 2017-11- 2018-05- 2018-05- EÍCULOS PARA A POLÍCIA C IBRD / 82760 Post E-Auctions Open 868,359.37 750,024.49 ublic Services d 11 30 27 04 04 03 IVIL DO RIO GRANDE DO N ORTE 384816/2016-5 / AQUISIÇà Component 2: Improving P 2017-06- 2017-06- 2017-07- 2018-01- IBRD / 82760 Post E-Auctions Open 571,428.00 0.00 Canceled O DE VEÍCULOS PARA POLÍ ublic Services 02 21 26 22 CIA ID89 GO / MOBILIÁRIO PA RA O LABORATÓRIO DE AN Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2018-03- 2017-10- 2017-11- 2017-12- 2018-02- 2018-08- ATOMOHISTOPATOLOGIA, IBRD / 82760 Prior Open - National 1,556,250.00 0.00 Canceled ublic Services s e Envelope 13 13 18 29 29 02 01 02 CENTROS ONCOLÓGICO S E 07 HOSTAIS DE URGÊN CIA E EMERGÊNCIA ID91 G0 / EQUIPAMENTOS DO SISTEMA CLIMATIZAÇà Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2019-09- 2017-10- 2019-09- 2017-12- 2019-09- 2018-01- 2019-10- 2018-02- 2019-11- 2018-08- 2020-05- O PARA O LABORATÓRIO D IBRD / 82760 Post Open - National 309,375.00 349,801.29 Signed ublic Services s e Envelope 20 26 25 26 06 26 05 16 09 29 08 22 E ANATOMOHISTOPATOLO GIA E 07 HOSPITAIS DE UR GÊNCIA E EMERGÊNCIA ID92 G0 / EQUIPAMENTOS DE TI PARA O LABORATÓRI Under Impl Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2018-03- 2017-10- 2017-12- 2018-04- 2018-01- 2018-09- 2018-02- 2018-08- O DE ANATOMOHISTOPATO IBRD / 82760 Post Open - National 365,374.20 0.00 ementatio ublic Services s e Envelope 20 21 25 06 16 05 28 09 08 LOGIA, 02 CENTROS ONCO n LÓGICOS E 07 HOSPITAIS D E URGÊNCIA E EMERGÊNCI A Page 3 ID93 GO / UTENSÍLIOS DE HOTELARIA HOSPITALAR P ARA O LABORATÓRIO DE A Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2019-03- 2017-10- 2017-12- 2019-03- 2018-01- 2019-05- 2018-02- 2019-10- 2018-08- 2020-02- IBRD / 82760 Post Open - National 109,375.00 183,002.58 Signed NATOMOHISTOPATOLOGIA, ublic Services s e Envelope 20 13 25 06 28 05 31 09 02 08 13 02 CENTROS ONCOLÓGICO S E 07 HOSPITAIS DE URGÊ NCIA E EMERGÊNCIA ID107 GO / AQUISICAO DE MOBILIÁRIO, ILUMINAÇÃO Component 1: Sustainable Request for Bid Single Stage - On 2017-10- 2018-06- 2017-10- 2017-12- 2018-04- 2018-01- 2018-06- 2018-02- 2018-08- 2018-08- 2019-10- IBRD / 82760 Post Open - National 145,647.32 121,600.97 Completed E PELÍCULAS PARA BIBLIOT Regional Development s e Envelope 19 05 24 05 17 04 05 08 17 07 11 ECA PÚBLICA CÂMARA CAS CUDO ID90 1 GO / EQUIPAMENT OS MÉDICOS PARA O LABO Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2017-12- 2017-10- 2017-12- 2018-04- 2018-01- 2018-08- 2018-02- 2019-03- 2018-08- 2019-09- RATÓRIO DE ANATOMOHIS IBRD / 82760 Post Open - National 985,457.30 264,163.12 Signed ublic Services s e Envelope 20 20 25 06 11 05 24 09 14 08 10 TOPATOLOGIA, 02 CENTRO S DE REFERÊNCIA EM ONC OLÓGICOS ID90 2 GO / EQUIPAMENT OS MÉDICOS PARA 07 (SE Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2018-06- 2017-10- 2018-08- 2017-12- 2019-09- 2018-01- 2020-03- 2018-02- 2020-06- 2018-08- 2021-02- TE) HOSPITAIS DE URGÊNC IBRD / 82760 Prior Open - National 3,835,614.05 1,020,684.37 Signed ublic Services s e Envelope 20 19 25 08 06 27 05 21 09 02 08 06 IA E EMERGÊNCIA E O BAN CO DE LEITE HUMANO DE P AU DOS FERROS ID108 GO / EQUIPAMENTO Component 1: Sustainable Request for Quo Single Stage - On 2017-11- 2018-01- 2018-07- 2018-07- 2019-11- IBRD / 82760 Post Limited 14,602.00 9,605.68 Completed S PARA O TEATRO ADJUNT Regional Development tations e Envelope 08 03 27 02 13 O DIAS -CAICÓ ID109 GO / AQUISICAO DE Component 1: Sustainable Request for Quo Single Stage - On 2017-10- 2017-12- 2018-06- INSTALAÇÃO DE OBRA DE IBRD / 82760 Post Limited 8,750.00 0.00 Canceled Regional Development tations e Envelope 28 23 21 ARTE - ESCULTURA PARA O MUSEU CAFÉ FILHO ID110 GO / AQUISICAO DE Component 1: Sustainable Request for Quo Single Stage - On 2017-10- 2017-12- 2018-06- PAINÉIS EXPOSITIVO PARA IBRD / 82760 Post Limited 28,652.00 0.00 Canceled Regional Development tations e Envelope 28 23 21 O MUSEU CAFÉ FILHO ID111 GO / AQUISICAO DE Component 1: Sustainable Request for Quo Single Stage - On 2017-10- 2017-12- 2018-06- INSTALAÇÃO DE OBRA DE IBRD / 82760 Post Limited 4,687.50 0.00 Canceled Regional Development tations e Envelope 28 23 21 ARTE - PAINEL PARA O MUS EU CAFÉ FILHO ID112 GO / AQUISIÇÃO DE PLATAFORMAS DE COLETA Component 1: Sustainable 2017-10- 2017-11- 2018-08- 2017-12- 2018-10- 2018-06- 2019-10- DE DADOS, DE TELEPLUVIO IBRD / 82760 Post E-Auctions Open 1,234,375.00 983,479.15 Signed Regional Development 25 13 24 18 27 16 31 METROS E DE GERADOR D O MONITORAMENTO HIDR OMETEOROLÓGICO ID 113 GO / Equipamentos Component 1: Sustainable 2017-11- 2017-12- 2018-08- 2018-01- 2018-10- 2018-07- 2019-06- para sistema de controle d IBRD / 82760 Post E-Auctions Open 131,461.20 100,209.04 Completed Regional Development 29 18 09 22 09 21 05 e saída de livros da Bibliote ca Câmara Cascudo ID114 GO / AQUISIÇÃO E I NSTALAÇÃO DE APARELHO S CONDICIONADORES DE A Component 3: Public Sect 2017-12- 2018-01- 2019-12- 2018-02- 2019-04- 2018-08- R PARA A NOVA SEDE DO S IBRD / 82760 Post E-Auctions Open 159,375.00 79,653.14 Signed or Management 18 06 26 10 01 09 INE/RN, PAPA JERIMUM, CE NTRAL ESTADUAL DE COM ERCIALIZAÇÃO DO ARTESA NATO E CASA DO ARTESÃO DE CAICÓ/RN ID95 GO / AQUISICAO DE 0 1 (UMA) AMBULÂNCIA TIPO "UTI", 07 (SETE) AMBULÂN Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2018-03- 2017-11- 2017-12- 2018-01- 2018-07- 2018-02- 2018-08- 2018-08- 2020-02- IBRD / 82760 Post Open - National 199,062.50 342,950.81 Completed CIAS SIMPLES E 01 (UM) V ublic Services s e Envelope 27 01 01 13 12 11 16 07 15 10 EÍCULO AUTOMOTOR PARA O LABORATÓRIO DE ANAT OMOHISTOPATOLOGIA ID94 GO / AQUISICAO DE 0 1 (UM) VEÍCULO AUTOMOT Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2017-11- 2017-12- 2018-01- 2018-02- 2018-08- IBRD / 82760 Post Open - National 15,625.00 0.00 Canceled OR PARA O LABORATÓRIO ublic Services s e Envelope 27 01 13 12 16 15 DE ANATOMOHISTOPATOL OGIA ID118 GO / CONDICIONAD ORES DE AR P/ 46 ESCOLA Component 2: Improving P 2018-03- 2018-03- 2019-12- 2018-04- 2019-10- 2018-10- IBRD / 82760 Post E-Auctions Open 1,326,923.00 890,140.84 Signed S (40 REFORMAS/AMPLIAÇ ublic Services 02 21 27 25 19 22 ÃO E 06 EM CONSTRUÇÃO) ACORDO MARCO ID119 GO / UTENSÍLIOS E EQUIPAMENTOS DE COZIN Component 2: Improving P 2018-03- 2018-03- 2018-09- 2018-04- 2019-02- 2018-10- 2019-05- HA P/ 46 ESCOLAS (40 REF IBRD / 82760 Post E-Auctions Open 1,271,635.00 390,045.30 Signed ublic Services 02 21 05 25 18 22 28 ORMAS/AMPLIAÇÃO E 06 E M CONSTRUÇÃO) ACORDO MARCO ID120 GO / EQUIPAMENTO S P/ LABORATÓRIOS DE CIÊ Component 2: Improving P 2018-03- 2018-03- 2018-04- 2018-10- NCIAS, MATEMÁTICA E LÍN IBRD / 82760 Prior E-Auctions Open 4,025,000.00 0.00 Canceled ublic Services 02 21 25 22 GUAS P/ 46 ESCOLAS (40 R EFORMAS/AMPLIAÇÃO E 06 EM CONSTRUÇÃO) ACORD O MARCO ID121 GO / AQUISIÇÃO DE KITS DE EQUIPAMENTOS P/ Component 2: Improving P 2018-03- 2018-03- 2018-04- 2018-10- IBRD / 82760 Post E-Auctions Open 1,198,969.00 0.00 Canceled IMPLANTAÇÃO DO "PROJET ublic Services 02 21 25 22 O ROBÓTICA" ACORDO MA RCO ID10 1 GO / EQUIPAMENT Component 2: Improving P Request for Bid Single Stage - On 2018-03- 2018-03- 2018-03- 2018-08- 2018-04- 2018-09- 2018-05- 2019-01- 2018-06- 2020-04- 2018-12- 2020-06- OS MEDICO HOSPITALARES IBRD / 82760 Prior Open - National 1,945,312.00 365,228.54 Signed ublic Services s e Envelope 02 28 07 21 18 05 18 11 22 09 19 08 PARA LEITOS DE UTI NEON ATAL ID10 GO / EQUIPAMENTOS Component 2: Improving P 2017-06- 2017-07- 2017-08- 2017-11- MEDICO HOSPITALARES PA IBRD / 82760 Prior E-Auctions Open 1,945,312.00 0.00 Canceled ublic Services 30 19 23 06 RA LEITOS DE UTI NEONAT AL ID89 1 GO / MOBILIÁRIO P ARA O LABORATÓRIO DE A Component 2: Improving P Request for Bid Single Stage - On 2018-03- 2018-04- 2018-05- 2018-06- 2018-06- 2018-10- 2018-07- 2018-12- 2019-01- 2019-04- NATOMOHISTOPATOLOGIA, IBRD / 82760 Post Open - National 343,750.00 116,671.63 Completed ublic Services s e Envelope 27 01 13 11 12 16 17 04 13 26 02 CENTROS ONCOLÓGICO S E 07 HOSTAIS DE URGÊN CIA E EMERGÊNCIA ID125 GO / AQUISICAO E I NSTALAÇÃO DE SISTEMA D Component 1: Sustainable 2018-04- 2019-07- 2018-04- 2018-04- 2018-10- 2018-06- 2018-11- IBRD / 82760 Post E-Auctions Open 13,379.38 0.00 Canceled E ACESSO ELETRÔNICA PA Regional Development 04 10 09 28 24 02 29 RA O MUSEU CAFÉ FILHO 361274 / AQUISICAO DE E QUIPAMENTOS PARA O DA Component 3: Public Sect 2018-04- 2019-04- 2018-04- 2020-06- 2018-04- 2020-06- 2018-06- 2019-07- 2018-11- 2020-05- TACENTER DA COORDENA IBRD / 82760 Post E-Auctions Open 1,020,542.23 833,918.96 Completed or Management 05 03 10 01 29 01 03 29 30 06 DORIA DE TECNOLOGIA, IN FORMAÇÃO E COMUNICAÇ ÃO DO RN (SEARH) ID124GO / AQUISICAO DE BENS E CONTRATAÇÃO DE Component 1: Sustainable Request for Bid Single Stage - On 2018-09- 2018-08- 2018-09- 2018-10- 2018-11- 2018-10- 2019-01- 2019-03- 2019-07- 2019-10- IBRD / 82760 Post Open - National 32,957.81 24,350.44 Completed SERVIÇOS DE CONFECÇÃO Regional Development s e Envelope 14 23 19 31 30 22 04 12 03 26 DE MÓVEIS E ACRÍLICOS P ARA O MUSEU CAFÉ FILHO ID124 GO / AQUISICAO DE BENS E CONTRATAÇÃO DE Component 1: Sustainable Request for Quo Single Stage - On 2018-04- 2018-06- 2018-12- IBRD / 82760 Post Open - National 32,957.81 0.00 Canceled SERVIÇOS DE CONFECÇÃO Regional Development tations e Envelope 23 18 15 DE MÓVEIS E ACRÍLICOS P ARA O MUSEU CAFÉ FILHO ID134 GO / AQUISIÇÕES D Component 3: Public Sect Request for Quo Single Stage - On 2018-09- 2018-11- 2019-05- E UTENSÍLIOS PARA ESTRU IBRD / 82760 Post Open - National 93,750.00 0.00 Canceled or Management tations e Envelope 19 14 13 TURAÇÃO DAS CENTRAIS D O CIDADÃO ID88 1 GO / AQUISICAO DE Component 2: Improving P 2018-09- 2018-09- 2018-09- 2018-08- 2018-10- 2018-10- 2019-04- 2019-02- IBRD / 82760 Post Direct Selection Direct 868,359.37 820,111.49 Completed VEÍCULOS PARA POLÍCIA CI ublic Services 21 28 26 04 31 08 29 06 VIL DO RN ID115 GO / SISTEMA INTE Component 3: Public Sect Request for Bid Single Stage - On Terminate 2018-02- 2018-11- 2018-02- 2018-04- 2018-05- 2019-01- 2018-06- 2018-12- 2018-12- GRADO DE REGISTRO E LE IBRD / 82760 Post Open - National 1,390,000.00 1,028,812.38 or Management s e Envelope d 21 12 26 09 09 18 13 22 10 GALIZAÇÃO DE EMPRESAS ID96 GO / AQUISICAO DE I NSTRUMENTAL CIRÚRGICO Component 2: Improving P Request for Bid Single Stage - On 2018-10- 2020-02- 2018-10- 2018-12- 2020-02- 2019-01- 2020-03- 2019-02- 2019-08- IBRD / 82760 Post Open - National 468,750.00 0.00 Canceled PARA 07 (SETE) HOSPITAIS ublic Services s e Envelope 25 28 30 11 28 10 04 14 13 DE URGÊNCIA E EMERGÊN CIA ID136 GO / GAIOLA BOIAD Component 1: Sustainable Request for Quo Single Stage - On 2018-11- 2020-02- 2019-01- 2019-10- 2019-07- 2019-12- EIRA EM MADEIRA PARA TR IBRD / 82760 Post Limited 10,937.50 5,621.93 Completed Regional Development tations e Envelope 13 28 08 24 07 25 ANSPORTAR ANIMAIS ID117 GO / MOBILIÁRIOS P Component 2: Improving P 2018-03- 2018-03- 2018-04- 2018-10- / 20 ESCOLAS (20 REFORM IBRD / 82760 Prior E-Auctions Open 3,125,000.00 0.00 Canceled ublic Services 02 21 25 22 AS/AMPLIAÇÃO) PARTE II D O ACORDO MARCO ID 117 1 / Acordo Marco p ara aquisição, montagem e Component 2: Improving P Request for Bid Single Stage - On 2019-01- 2019-03- 2019-01- 2019-03- 2019-02- 2019-09- 2019-03- 2021-01- 2019-04- 2020-11- 2019-10- instalação de mobiliário pa IBRD / 82760 Prior Open - National 2,606,554.00 285,562.47 Signed ublic Services s e Envelope 07 08 12 27 23 27 25 04 29 20 26 ra reorganização estrutural de 20 Escolas da Rede Esta dual de Ensino. ID122 GO / EQUIPAMENTO S DE TI P/ LABORATÓRIO D Component 2: Improving P 2018-03- 2018-03- 2018-04- 2018-10- IBRD / 82760 Prior E-Auctions Open 2,500,000.00 0.00 Canceled E INFORMÁTICA P/ 100 ESC ublic Services 02 21 25 22 OLAS - SIMAIS ACORDO MA RCO ID 116 1 GO / MOBILIÁRIO S P/ 26 ESCOLAS (20 REFO Component 2: Improving P Request for Bid Single Stage - On 2019-01- 2019-03- 2019-01- 2019-03- 2019-03- 2019-04- 2019-05- 2019-11- IBRD / 82760 Prior Open - National 5,000,000.00 0.00 Canceled RMAS/AMPLIAÇÃO E 06 EM ublic Services s e Envelope 22 08 27 27 10 09 14 10 CONSTRUÇÃO) PARTE I DO ACORDO MARCO ID116 GO / MOBILIÁRIOS P / 26 ESCOLAS (20 REFORM Component 2: Improving P 2018-03- 2018-03- 2018-04- 2018-10- IBRD / 82760 Prior E-Auctions Open 5,000,000.00 0.00 Canceled AS/AMPLIAÇÃO E 06 EM CO ublic Services 02 21 25 22 NSTRUÇÃO) PARTE I DO AC ORDO MARCO 118313/2016-3 / SERVIÇO Component 3: Public Sect 2017-06- 2017-06- 2017-07- 2018-01- S DE FORNECIMENTO, MON IBRD / 82760 Post E-Auctions Open 1,136,364.00 0.00 Canceled or Management 01 20 25 21 TAGEM E INSTALAÇÃO DE MOBILIÁRIO DA SEPLAN ID 122 2 GO / ACORDO MA RCO DE TI DA SEEC (AQUIS IÇÃO DE EQUIPAMENTOS D Component 2: Improving P Request for Bid Single Stage - On 2019-03- 2019-08- 2019-03- 2019-12- 2019-05- 2020-05- 2019-06- 2020-01- 2019-07- 2020-02- 2020-01- IBRD / 82760 Post Open - National 1,468,750.00 586,418.63 Signed E INFORMÁTICA PARA IMPL ublic Services s e Envelope 20 15 25 16 06 05 05 10 10 28 06 ANTAÇÃO E ESTRUTURAÇà O TECNOLÓGICA DAS ESC OLAS DA REDE ESTADUAL DE ENSINO). ID123 GO / MOBILIÁRIO PA Component 1: Sustainable 2018-03- 2018-04- 2018-05- 2018-11- IBRD / 82760 Post E-Auctions Open 18,000.00 0.00 Canceled RA ESTACÃO DE PISCICULT Regional Development 20 08 13 09 URA ID2 GO / AQUISICAO DE M ATERIAIS DE DESPESCA E L ABORATORIO, PARA ESTRU Component 1: Sustainable Request for Quo Single Stage - On 2017-05- 2017-08- 2017-08- TURACAO DA ESTACAO DE IBRD / 82760 Post Limited 19,241.19 0.00 Canceled Regional Development tations e Envelope 12 11 11 PISCICULTURA DE APODI, N A BARRAGEM DE SANTA CR UZ, LOCALIZADA NO MUNI CIPIO DE APODI/RN ID133GO / EQUIPAMENTO S MÉDICOS PARA CENTRO Component 2: Improving P Request for Bid Single Stage - On 2018-10- 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- IBRD / 82760 Prior Open - National 968,750.00 0.00 Canceled DE REFERENCA EM ONCOL ublic Services s e Envelope 01 06 17 17 21 20 OGIA DE SANTO ANTONIO ( ID000002) ID132GO / EQUIPAMENTO Component 2: Improving P Request for Bid Single Stage - On 2019-01- 2019-01- 2019-02- 2019-03- 2019-05- 2019-10- S PARA O CENTRO DE TREI IBRD / 82760 Post Open - National 156,250.00 0.00 Canceled ublic Services s e Envelope 10 15 26 28 02 29 NAMENTO DA CFAPM - SES ED ID100 GO / EQUIPAMENTO Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2017-11- 2017-12- 2018-01- 2018-02- 2018-08- S DO SISTEMA CLIMATIZAÇ IBRD / 82760 Post Open - National 718,750.00 0.00 Canceled ublic Services s e Envelope 27 01 13 12 16 15 ÃO PARA O HOSPITAL DA M ULHER ID63 1 GO / AQUISIÇÃO DE EQUIPAMENTOS DE TI PAR Component 2: Improving P Request for Bid Single Stage - On 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-07- 2020-02- 2019-08- 2019-10- 2019-10- 2020-04- A SISTEMA DE COLETA E G IBRD / 82760 Post Open - National 5,883.62 4,736.30 Completed ublic Services s e Envelope 30 03 05 16 13 16 28 20 31 19 03 ERENCIAMENTO DE DADOS BIOMÉTRICOS DO ITEP - RE LICITAÇÃO DE LOTES 116 2 GO / Aquisição, Mon tagem e Instalação de Mob iliário Para Reorganização Component 2: Improving P Request for Bid Single Stage - On 2019-07- 2019-08- 2019-07- 2021-08- 2019-09- 2021-08- 2019-10- 2021-12- 2019-11- 2022-05- 2020-05- IBRD / 82760 Prior Open - National 3,737,263.44 1,823,937.84 Signed Estrutural da Secretaria de ublic Services s e Envelope 26 20 31 11 11 25 11 07 15 14 13 Estado da Educação e da C ultura/SEEC/RN e Escolas d a Rede Estadual. ID 122 1 / Acordo Marco d e TI da SEEC (Aquisição de Component 2: Improving P Request for Bid Single Stage - On 2019-01- 2019-01- 2019-02- 2019-03- 2019-04- 2019-10- Equipamentos de Informáti IBRD / 82760 Prior Open - National 2,583,606.25 0.00 Canceled ublic Services s e Envelope 07 12 23 25 29 26 ca para Implantação e Estr uturação Tecnológica das E scolas da Rede Estadual de Ensino). ID139 GO / ROTEADORES PARA ESTRUTURAÇÃO DA Component 2: Improving P Request for Bid Single Stage - On 2019-09- 2019-09- 2019-10- 2019-11- 2020-01- 2020-06- IBRD / 82760 Post Open - National 265,625.00 0.00 Canceled SECRETARIA DE SEGURAN ublic Services s e Envelope 11 16 28 27 01 29 ÇA PÚBLICA E DA DEFESA SOCIAL DO RN ID140 GO / SOLUÇÃO INTE GRADA DE INFORMAÇÃO A Component 3: Public Sect Request for Bid Single Stage - On 2019-09- 2020-07- 2019-09- 2020-07- 2019-10- 2020-08- 2019-11- 2020-01- 2020-06- IBRD / 82760 Prior Open - National 2,187,500.00 0.00 Canceled NALÍTICA E MINERAÇÃO DE or Management s e Envelope 11 21 16 21 28 13 27 01 29 DADOS PARA ADMINISTRA ÇÃO DO ESTADO DO RN ID141 GO / AQUISIÇÃO DE MATERIAL DE INSEMINAÇà O, DE LABORATÓRIO E EST Component 1: Sustainable Request for Bid Single Stage - On 2019-11- 2020-02- 2019-11- 2020-03- 2019-12- 2020-03- 2020-01- 2020-04- 2020-02- 2020-06- 2020-08- 2020-08- RUTURAÇÃO NUTRICIONAL IBRD / 82760 Post Open - National 30,438.61 2,265.64 Completed Regional Development s e Envelope 06 07 11 19 23 26 22 28 26 30 24 01 PARA O PROJETO DE FORT ALECIMENTO DA PECUÁRIA LEITEIRA, BOVINA E CAPRI NA DO ESTADO DO RN ID142 GO / AQUISIÇÃO DE MATERIAL PERMANENTE PA Component 1: Sustainable Request for Bid Single Stage - On 2019-11- 2020-02- 2019-11- 2020-03- 2019-12- 2020-04- 2020-01- 2020-04- 2020-02- 2020-08- 2020-08- 2020-12- RA O PROJETO DE FORTALE IBRD / 82760 Post Open - National 44,372.85 6,615.60 Signed Regional Development s e Envelope 06 07 11 19 23 03 22 28 26 25 24 15 CIMENTO DA PECUÁRIA LEI TEIRA, BOVINA E CAPRINA DO ESTADO DO RN ID90 3 GO / AQUISIÇÃO DE EQUIPAMENTOS MÉDICOS Component 2: Improving P Request for Bid Single Stage - On 2019-11- 2020-05- 2019-11- 2020-07- 2020-01- 2020-08- 2020-02- 2020-08- 2020-03- 2020-09- HOSPITALARES PARA LABO IBRD / 82760 Post Open - National 151,956.05 0.00 Canceled ublic Services s e Envelope 25 14 30 24 11 06 10 19 16 12 RATÓRIO, CENTRO DE REF ERÊNCIA E MATERNIDADES (RELICITAÇÃO) ID137 GO / EQUIPAMENTO Pending Im Component 2: Improving P Request for Bid Open - Internatio Single Stage - On 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- S MÉDICOS E DE LABORAT IBRD / 82760 Prior 8,057,671.88 0.00 plementati ublic Services s nal e Envelope 10 15 26 26 30 27 ÓRIO PARA O HOSPITAL DA on MULHER ID138 GO / CONTRATAÇà Component 2: Improving P 2020-03- 2020-03- 2020-04- 2020-03- 2020-05- 2020-03- 2020-07- 2020-05- O DIRETA DE MOBILIÁRIO IBRD / 82760 Post Direct Selection Direct 335,398.44 213,650.84 Completed ublic Services 27 23 01 20 06 29 05 09 HOSPITALAR PARA COMBA TER O COVID-19 ID 143 GO / CONTRATAÇà O DIRETA PARA AQUISIÇÃO DE EQUIPAMENTOS E MOBI Component 2: Improving P 2020-04- 2020-03- 2020-04- 2020-04- 2020-05- 2020-04- 2020-07- LIÁRIOS HOSPITALARES PA IBRD / 82760 Post Direct Selection Direct 130,000.00 35,912.43 Signed ublic Services 02 31 07 01 12 04 11 RA ESTRUTURAÇÃO DAS U NIDADES HOSPITALARES A SEREM UTILIZADOS NO CO MBATE AO CORONAVÍRUS ID 144 GO / CONTRATAÇà O DIRETA DA PARA AQUISI ÇÃO MONITORES MULTIPA Component 2: Improving P 2020-04- 2020-04- 2020-04- 2020-03- 2020-05- 2020-04- 2020-07- RÂMETROS DE SINAIS VITAI IBRD / 82760 Post Direct Selection Direct 398,750.00 236,134.51 Signed ublic Services 02 01 07 31 12 07 11 S E CARDIOVERSORES PAR A ESTRUTURAÇÃO DAS UNI DADES HOSPITALARES PAR A O COMBATE AO CORONA VÍRUS ID 145 GO / CONTRATAÇà O DIRETA PARA AQUISIÇÃO DE EQUIPAMENTOS DE RAI Component 2: Improving P 2020-04- 2020-03- 2020-04- 2020-03- 2020-05- 2020-04- 2020-07- 2020-06- IBRD / 82760 Post Direct Selection Direct 147,500.00 86,041.11 Completed O X PARA ESTRUTURAÇÃO ublic Services 02 31 07 30 12 08 11 07 DAS UNIDADES HOSPITALA RES PARA O COMBATE AO CORONAVÍRUS ID 146 GO / MÁSCARAS DE TECIDO PARA USO DA POP Component 2: Improving P Request for Quo Single Stage - On 2020-04- 2020-04- 2020-06- 2020-05- 2020-09- 2020-05- IBRD / 82760 Post Limited 300,000.00 200,245.91 Completed ULAÇÃO PARA APOIO AO C ublic Services tations e Envelope 28 24 23 05 21 30 OMBATE DO COVID19 ID148 GO / AQUISIÇÃO DE TOMÓGRAFO PARA O HOSP ITAL REGIONAL CLEODON CARLOS NO MUNICÍPIO DE Component 2: Improving P Request for Bid Single Stage - On 2020-05- 2020-05- 2020-05- 2020-05- 2020-06- 2020-05- 2020-07- 2020-05- 2020-08- 2020-06- 2021-02- 2021-02- IBRD / 82760 Post Open - National 595,605.13 274,617.05 Completed PAU DOS FERROS PARA CO ublic Services s e Envelope 05 15 10 21 21 15 21 28 25 13 21 24 MBATER COVID-19, ATRAV ÉS DE PREGÃO ELETRÔNIC O, COM APLICAÇÃO DA SIM PLIFICAÇÃO CONTIDA NA L EI N°. 13.979/2020. ID149 GO / AQUISIÇÃO DE EQUIPAMENTO MÉDICO HO SPITALAR DE INTERVENÇÕ ES TERAPÊUTICAS PARA PA Under Impl Component 2: Improving P Request for Bid Single Stage - On 2020-05- 2020-06- 2020-05- 2020-06- 2020-07- 2020-06- 2020-08- 2020-07- 2020-09- 2021-03- CIENTES INTERNADOS PAR IBRD / 82760 Post Open - National 1,641,855.90 0.00 ementatio ublic Services s e Envelope 24 12 29 15 10 18 09 16 13 12 A ENFRENTAMENTO DA CO n VID-19, ATRAVÉS DE PREG ÃO ELETRÔNICO, COM APLI CAÇÃO DA SIMPLIFICAÇÃO CONTIDA NA LEI N°. 13.97 9/2020. ID150 GO / AQUISIÇÃO DE CESTAS BÁSICAS PARA ATE Component 1: Sustainable Request for Quo Single Stage - On 2020-07- 2020-07- 2020-08- 2020-08- 2021-02- IBRD / 82760 Post Limited 93,339.76 98,387.30 Signed NDIMENTO AOS GRUPOS Q Regional Development tations e Envelope 04 23 29 01 25 UILOMBOLAS NO ENFRENT AMENTO AO COVID-19 Page 4 ID125 GO-2 / AQUISIÇÃO E INSTALAÇÃO DE SISTEMA Component 1: Sustainable Request for Quo Single Stage - On 2020-07- 2020-09- 2021-03- IBRD / 82760 Post Open - National 13,379.38 0.00 Canceled DE ACESSO ELETRÔNICA P Regional Development tations e Envelope 22 16 15 ARA O MUSEU CAFÉ FILHO ID84 G0-2 / AQUISIÇÃO E I NSTALAÇÃO DE SERVIÇO D Component 1: Sustainable Request for Quo Single Stage - On 2020-07- 2020-09- 2021-03- IBRD / 82760 Post Open - National 10,000.00 0.00 Canceled E ÁUDIO E VÍDEO PARA AE Regional Development tations e Envelope 22 16 15 ROPORTO DE MOSSORÓ ID125 GO-3 / AQUISICAO E Under Impl INSTALAÇÃO DE SISTEMA Component 1: Sustainable Request for Quo Single Stage - On 2018-04- 2018-06- 2018-12- IBRD / 82760 Post Open - National 13,379.38 0.00 ementatio DE ACESSO ELETRÔNICA P Regional Development tations e Envelope 23 18 15 n ARA O MUSEU CAFÉ FILHO ID84 GO-3 / AQUISICAO E I NSTALACAO DE SERVICO D Component 1: Sustainable Request for Bid Single Stage - On 2017-04- 2017-04- 2017-06- 2017-07- 2017-08- 2018-02- IBRD / 82760 Post Open - National 10,000.00 0.00 Canceled E AUDIO E VIDEO PARA AE Regional Development s e Envelope 19 24 05 05 09 05 ROPORTO DE MOSSORO ID92 GO-2 / EQUIPAMENT OS DE TI PARA O LABORAT Under Impl Component 2: Improving P Request for Bid Single Stage - On 2018-03- 2018-03- 2018-03- 2018-05- 2018-04- 2018-06- 2018-09- 2018-07- 2019-01- ÓRIO DE ANATOMOHISTOP IBRD / 82760 Post Open - National 365,374.20 0.00 ementatio ublic Services s e Envelope 21 19 26 07 03 06 21 11 07 ATOLOGIA, 02 CENTROS O n NCOLÓGICOS E 07 HOSPIT AIS DE URGÊNCIA E EMERG ÊNCIA ID151 GO / AQUISIÇÃO DE MOBILIÁRIO PARA ATENDE Component 1: Sustainable 2020-08- 2022-01- 2020-08- 2022-02- 2020-08- 2020-09- 2021-03- R AS DEMANDAS DE IMPLA IBRD / 82760 Post E-Auctions Open 154,641.76 0.00 Canceled Regional Development 02 11 07 10 26 30 29 NTAÇÃO DA PRIMEIRA ETA PA DO PARQUE TECNOLÓGI CO DO RN AUGUSTO SEVE RO ID149 GO-1 / AQUISIÇÃO D E EQUIPAMENTO MÉDICO H OSPITALAR DE INTERVENÇ ÕES TERAPÊUTICAS PARA P Component 2: Improving P Request for Bid Single Stage - On 2020-06- 2020-06- 2020-06- 2020-07- 2020-06- 2020-08- 2020-07- 2020-10- 2020-09- 2021-03- 2021-08- ACIENTES INTERNADOS PA IBRD / 82760 Post Open - National 1,641,855.90 432,531.17 Completed ublic Services s e Envelope 12 06 17 29 18 28 16 02 03 31 05 RA ENFRENTAMENTO DA C OVID-19, ATRAVÉS DE PRE GÃO ELETRÔNICO, COM AP LICAÇÃO DA SIMPLIFICAÇà O CONTIDA NA LEI N°. 13.9 79/2020. ID84 GO-1 / AQUISIÇÃO E I Under Impl NSTALAÇÃO DE SERVIÇO D Component 1: Sustainable Request for Quo Single Stage - On 2017-04- 2017-06- 2017-12- IBRD / 82760 Post Open - National 10,000.00 0.00 ementatio E ÁUDIO E VÍDEO PARA AE Regional Development tations e Envelope 24 19 16 n ROPORTO DE MOSSORÓ ID92 GO-3 / EQUIPAMENT OS DE TI PARA O LABORAT Under Impl Component 2: Improving P Request for Bid Single Stage - On 2018-03- 2018-02- 2018-03- 2018-05- 2018-04- 2018-06- 2018-09- 2018-07- 2019-01- ÓRIO DE ANATOMOHISTOP IBRD / 82760 Post Open - National 365,374.20 0.00 ementatio ublic Services s e Envelope 19 21 24 05 03 04 25 09 05 ATOLOGIA, 02 CENTROS O n NCOLÓGICOS E 07 HOSPIT AIS DE URGÊNCIA E EMERG ÊNCIA ID93 GO-1 / UTENSÍLIOS D E HOTELARIA HOSPITALAR PARA O LABORATÓRIO DE Component 2: Improving P Request for Bid Single Stage - On 2019-03- 2019-03- 2019-03- 2019-04- 2019-03- 2019-05- 2019-05- 2019-07- 2019-10- 2019-12- 2020-02- IBRD / 82760 Post Open - National 109,375.00 36,244.42 Completed ANATOMOHISTOPATOLOGI ublic Services s e Envelope 13 13 18 29 28 29 31 03 02 30 13 A, 02 CENTROS ONCOLÓGI COS E 07 HOSPITAIS DE UR GÊNCIA E EMERGÊNCIA ID131GO / VIATURAS PARA Component 2: Improving P Request for Bid Single Stage - On 2018-09- 2018-10- 2018-11- 2018-12- 2019-01- 2019-07- COLETA DOMICILIAR E DIST IBRD / 82760 Post Open - National 46,875.00 0.00 Canceled ublic Services s e Envelope 28 03 14 14 18 17 RIBUIÇÃO DO LEITE HUMA NO PARA NEONATOS ID157 GO / AQUISIÇÕES D E EQUIPAMENTOS DE BIOM Component 3: Public Sect Request for Bid Single Stage - On 2020-09- 2021-04- 2020-10- 2021-05- 2020-11- 2021-06- 2020-12- 2021-08- 2021-01- 2022-04- 2021-03- IBRD / 82760 Post Open - National 545,007.16 453,620.76 Signed ÉTRICO PARA CONFECÇÃO or Management s e Envelope 30 30 05 20 16 30 16 10 20 13 21 DE IDENTIDADE CIVIL EM T ODO ESTADO DO RN. ID155 GO / AQUISIÇÕES D E EQUIPAMENTOS DE PROT EÇÃO INDIVIDUAL (EPI´s) P Component 2: Improving P Request for Bid Single Stage - On 2020-09- 2020-11- 2020-10- 2020-12- 2020-11- 2020-12- 2020-12- 2021-01- 2021-01- 2021-02- 2021-03- 2021-05- ARA ENFRENTAMENTO DA IBRD / 82760 Post Open - National 891,092.28 588,970.53 Completed ublic Services s e Envelope 30 30 05 04 16 04 16 12 20 09 06 21 COVID-19, ATRAVÉS DE PR EGÃO ELETRÔNICO, COM A PLICAÇÃO DA SIMPLIFICAÇ ÃO CONTIDA NA LEI N°. 13. 979/2020. ID159 GO / AQUISIÇÕES D E BICICLETAS DO TIPO “MO UNTAIN BIKE”, CAPACETES PARA CICLISTAS E SINALIZ Component 2: Improving P Request for Quo Single Stage - On 2020-10- 2020-12- 2021-07- 2021-02- 2021-08- AÇÃO LUMINOSA TRASEIRA IBRD / 82760 Post Open - National 18,416.70 10,051.89 Completed ublic Services tations e Envelope 11 06 02 04 27 , COM O INTUÍTO DE SERE M UTILIZADOS NO POLICIA MENTO TURÍSTICO OSTENS IVO QUE ATUARÁ NAS ADJA CÊNCIAS DA ORLA DE NAT AL E ROTA DO SOL ID160 GO / AQUISIÇÕES D Component 2: Improving P Request for Quo Single Stage - On 2020-10- 2020-12- 2021-01- 2021-02- 2021-03- E CADEIRAS TIPO PRESIDE IBRD / 82760 Post Open - National 62,467.04 33,165.62 Completed ublic Services tations e Envelope 11 06 26 04 09 NTE PARA O CIOSP/SESED/ RN. ID140 1 GO / SOLUÇÃO IN TEGRADA DE INFORMAÇÃO Component 3: Public Sect Request for Bid Single Stage - On 2019-09- 2021-01- 2019-09- 2021-01- 2019-10- 2021-01- 2019-11- 2021-03- 2020-01- 2021-05- 2020-06- 2021-10- IBRD / 82760 Prior Open - National 2,187,500.00 1,558,163.96 Completed ANALÍTICA E MINERAÇÃO D or Management s e Envelope 11 07 16 11 28 29 27 26 01 12 29 19 E DADOS PARA ADMINISTR AÇÃO DO ESTADO DO RN ID158 GO / AQUISIÇÕES D E VIATURAS DUAS RODAS ESTILO “TRAIL” E DE ESCO LTA COM ACESSÓRIOS E C Component 2: Improving P Request for Bid Single Stage - On 2020-10- 2020-12- 2020-10- 2021-05- 2020-11- 2021-06- 2020-12- 2021-09- 2021-02- 2021-11- 2021-03- 2022-08- IBRD / 82760 Post Open - National 566,252.92 28,359.41 Completed APACETES ESCAMOTEÁVEI ublic Services s e Envelope 14 08 19 17 30 18 30 15 03 10 20 21 S PARA UTILIZAÇÃO NO PO LICIAMENTO OSTENSIVO O BJETIVANDO O REAPARELH AMENTO DA POLÍCIA MILIT AR DO ESTADO DO RN ID162 GO / AQUISIÇÃO DE EQUIPAMENTOS PARA COM BATE À INCÊNDIO FLOREST Component 2: Improving P Request for Bid Single Stage - On 2020-10- 2021-02- 2020-10- 2021-02- 2020-10- 2021-03- 2020-11- 2021-06- 2020-12- 2021-07- 2021-03- 2021-08- AL A SEREM UTILIZADOS N IBRD / 82760 Post Open - National 147,921.05 94,926.27 Completed ublic Services s e Envelope 14 16 19 23 22 05 21 16 26 16 26 30 A PROTEÇÃO AMBIENTAL O BJETIVANDO O REAPARELH AMENTO DO CORPO DE BO MBEIROS MILITAR DO RN. ID164 GO / AQUISIÇÃO DE EMBARCAÇÕES TIPO BOTE INFLÁVEL PARA SALVAMEN TO AQUÁTICO NO SERVIÇO Component 2: Improving P Request for Quo Single Stage - On 2020-10- 2020-12- 2021-02- 2021-06- 2021-06- IBRD / 82760 Post Open - National 42,203.39 42,135.23 Completed DE GUARDA VIDAS E OPER ublic Services tations e Envelope 19 14 05 12 02 AÇÕES DE BUSCA NO SERV IÇO DE MERGULHADOR OB JETIVANDO O REAPARELHA MENTO DO CORPO DE BOM BEIROS MILITAR DO RN. ID165 GO / AQUISIÇÃO DE VIATURAS TIPO QUADRICIC LO PARA SALVAMENTO AQ UÁTICO E COMBATE À INCÊ Component 2: Improving P Request for Quo Single Stage - On 2020-10- 2020-12- 2021-02- 2021-03- 2021-05- IBRD / 82760 Post Open - National 95,178.91 94,224.55 Completed NDIO FLORESTAL PARA UTI ublic Services tations e Envelope 19 14 10 14 08 LIZAÇÃO NO SERVIÇO DE G UARDA VIDAS E DE PROTE ÇÃO OBJETIVANDO O REAP ARELHAMENTO DO CORPO DE BOMBEIROS MILITAR D OID 122 3 GO / AQUISIÇÃO RN. DE ESTABILIZADORES 300 VA PARA IMPLANTAÇÃO E E Component 2: Improving P Request for Quo Single Stage - On 2020-11- 2021-01- 2021-05- 2021-03- 2021-07- IBRD / 82760 Post Open - National 30,672.95 35,506.10 Completed STRUTURAÇÃO TECNOLÓGI ublic Services tations e Envelope 17 12 06 13 13 CA DAS ESCOLAS DA REDE ESTADUAL DE ENSINO) / R ELICITAÇÃO LOTE 2. ID169 GO / AQUISIÇÕES D E VEÍCULOS AUTOMOTORE S PARA FORTALEIMENTO D Component 3: Public Sect Request for Bid Single Stage - On 2020-11- 2021-04- 2020-11- 2021-05- 2020-12- 2021-07- 2021-01- 2021-09- 2021-02- 2021-10- 2021-03- 2022-01- IBRD / 82760 Prior Open - National 2,964,591.65 276,972.51 Completed AS SECRETARIAS DA ADMI or Management s e Envelope 24 26 29 03 29 09 13 23 11 16 28 18 NISTRAÇÃO DIRETA E ADMI NISTRAÇÃO INDIRETA DO GOVERNO DO RN. ID170 GO / AQUISIÇÕES E Component 3: Public Sect Request for Bid Single Stage - On 2020-11- 2021-02- 2020-11- 2021-05- 2020-12- 2021-08- 2021-01- 2021-11- 2021-02- 2021-03- INSTALAÇÕES DE USINAS F IBRD / 82760 Post Open - National 948,830.51 0.00 Signed or Management s e Envelope 24 17 29 20 29 05 13 11 07 24 OTOVOLTAICAS NAS CENT RAIS DO CIDADÃO ID171 GO / AQUISIÇÃO DE Component 2: Improving P Request for Bid Single Stage - On 2020-11- 2021-01- 2020-11- 2020-12- 2021-08- 2020-12- 2021-08- 2021-02- 2021-12- 2021-03- VIATURAS DESCARACTERIZ IBRD / 82760 Post Open - National 176,635.28 244,631.18 Signed ublic Services s e Envelope 25 08 30 15 05 30 23 27 29 14 ADAS TIPO “SUV” PARA A P OLÍCIA CIVIL DO RN ID167 GO / AQUISIÇÃO DE MICROCOMPUTADORES DE Component 3: Public Sect Request for Bid Single Stage - On 2020-12- 2021-06- 2020-12- 2021-06- 2021-01- 2021-07- 2021-01- 2021-08- 2021-02- 2021-10- 2021-03- SKTOPS PARA ESTRUTURA IBRD / 82760 Prior Open - National 2,088,505.45 1,648,176.80 Signed or Management s e Envelope 18 02 23 29 07 16 17 27 06 08 23 ÇÃO DOS ESPAÇOS FÍSICO S FINANCIADOS PELO PROJ ETO GOVERNO CIDADÃO ID168 GO / AQUISIÇÃO DE MICROCOMPUTADORES DE Component 3: Public Sect Request for Quo Single Stage - On 2020-12- 2021-02- 2021-05- 2021-03- 2021-06- IBRD / 82760 Post Open - National 11,295.00 11,688.52 Completed SKTOPS PARA ESTRUTURA or Management tations e Envelope 23 11 01 23 23 ÇÃO DO SISTEMA AGROME TEOROLÓGICO DO RN ID173 GO / AQUISIÇÃO DE ITENS DE INFORMÁTICA E P Component 3: Public Sect Request for Quo Single Stage - On 2020-12- 2021-02- 2021-05- 2021-03- 2021-06- ERIFÉRICOS PARA ESTRUT IBRD / 82760 Post Open - National 3,691.59 2,750.61 Completed or Management tations e Envelope 23 17 22 29 02 URAÇÃO DOS ESPAÇOS FÍS ICOS FINANCIADOS PELO P ROJETO GOVERNO CIDADà O 388140/2016-7 / ACORDO Component 1: Sustainable 2016-12- 2017-02- 2017-04- 2018-03- MARCO DE EQUIPAMENTO IBRD / 82760 Prior E-Auctions Limited 4,350,000.00 0.00 Canceled Regional Development 20 18 04 30 DE TI PARA OS INVESTIMEN TOS DO PROJETO ID142 GO-1 / AQUISIÇÃO D E MATERIAL PERMANENTE Component 1: Sustainable Request for Quo Single Stage - On 2020-12- 2021-02- 2021-08- 2021-03- 2021-08- PARA O PROJETO DE FORT IBRD / 82760 Post Open - National 37,757.25 27,387.53 Completed Regional Development tations e Envelope 23 17 14 29 12 ALECIMENTO DA PECUÁRIA LEITEIRA, BOVINA E CAPRI NA DO ESTADO DO RN ID90 4 GO / AQUISIÇÃO DE Component 2: Improving P Request for Bid Single Stage - On 2020-12- 2021-07- 2020-12- 2021-07- 2021-01- 2021-07- 2021-01- 2021-08- 2021-02- 2021-12- 2021-03- 2022-04- EQUIPAMENTOS MÉDICO-H IBRD / 82760 Post Open - National 1,309,383.09 900,796.19 Signed ublic Services s e Envelope 18 01 23 15 02 05 17 31 01 18 23 30 OSPITALARES E DE IMAGE M ID172 GO / AQUISIÇÃO DE ESTABILIZADORES E NOBR Component 3: Public Sect Request for Bid Single Stage - On 2020-12- 2021-04- 2020-12- 2021-05- 2021-01- 2021-05- 2021-01- 2021-07- 2021-02- 2021-08- 2021-03- EAKS PARA ESTRUTURAÇà IBRD / 82760 Post Open - National 178,962.15 91,281.49 Signed or Management s e Envelope 18 27 23 05 07 19 17 20 06 10 23 O DOS ESPAÇOS FÍSICOS FI NANCIADOS PELO PROJETO GOVERNO CIDADÃO ID90 5 GO / AQUISIÇÃO DE Component 2: Improving P Request for Bid Single Stage - On 2021-01- 2021-07- 2021-01- 2021-07- 2021-01- 2021-07- 2021-02- 2021-08- 2021-03- 2021-10- 2021-04- 2021-12- IBRD / 82760 Post Open - National 320,077.23 165,546.61 Signed EQUIPAMENTOS PARA LAB ublic Services s e Envelope 21 15 26 15 31 15 10 23 02 02 01 24 ORATÓRIO ID12 1 GO / AQUISIÇÃO DE MOBILIÁRIO HOSPITALAR, Component 2: Improving P Request for Bid Single Stage - On 2021-01- 2021-07- 2021-01- 2021-07- 2021-02- 2021-07- 2021-02- 2021-09- 2021-03- 2021-11- 2021-03- 2022-04- EQUIPAMENTOS DIVERSOS, IBRD / 82760 Post Open - National 293,091.48 159,732.21 Completed ublic Services s e Envelope 21 15 26 15 05 07 15 16 02 11 31 14 REFRIGERADORES E EQUIP AMENTOS PARA BANCO DE LEITE ID176 GO / AQUISIÇÃO DE EQUIPAMENTOS DE LABOR Component 1: Sustainable Request for Quo Single Stage - On 2021-02- 2021-04- 2021-07- 2021-10- 2021-10- ATÓRIO (SOLOS, ASFALTO IBRD / 82760 Post Open - National 75,000.00 67,800.48 Completed Regional Development tations e Envelope 24 21 13 18 29 E CONCRETO) PARA CONT ROLE TECNOLÓGICO DAS OBRAS RODOVIÁRIAS ID141 GO-1 / AQUISIÇÃO D E MATERIAL PERMANENTE, Pending Im DE INSEMINAÇÃO E DE LAB Component 1: Sustainable Request for Quo Single Stage - On 2020-12- 2021-02- 2021-03- IBRD / 82760 Post Open - National 65,930.22 0.00 plementati ORATÓRIO PARA O PROJET Regional Development tations e Envelope 23 17 29 on O DE FORTALECIMENTO DA PECUÁRIA LEITEIRA, BOVIN A E CAPRINA DO ESTADO D O RN ID177 GO / AQUISIÇÃO DE SERVIDOR COMPUTACIONA L, CLUSTER DE PROCESSA Component 1: Sustainable Request for Quo Single Stage - On 2021-04- 2021-06- 2022-03- 2021-09- MENTO E BATERIAS SELAD IBRD / 82760 Post Open - National 96,789.53 97,209.79 Completed Regional Development tations e Envelope 21 16 22 14 AS PARA O SISTEMA DE MO NITORAMENTO HIDROMETE OROLÓGICO, CLIMÁTICO E AGROMETEOROLÓGICO DO RN ID120 GO-1 / EQUIPAMENT OS P/ LABORATÓRIOS DE C IÊNCIAS, MATEMÁTICA E LÍ Component 2: Improving P Request for Bid Single Stage - On 2021-03- 2021-06- 2021-04- 2021-06- 2021-05- 2021-07- 2021-06- 2021-11- 2021-07- 2022-02- 2021-11- 2023-06- IBRD / 82760 Prior Open - National 4,025,000.00 821,373.93 Signed NGUAS P/ 46 ESCOLAS (40 ublic Services s e Envelope 29 02 03 17 15 02 14 29 19 14 16 28 REFORMAS/AMPLIAÇÃO E 0 6 ESCOLAS EM CONSTRUÇ ÃO) ACORDO MARCO ID178 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2021-04- 2021-06- 2021-06- 2021-12- AQUISIÇÃO DE TRÊS APARE IBRD / 82760 Post Open - National 70,001.22 47,435.54 Signed ublic Services tations e Envelope 28 23 22 20 LHOS DE AR CONDICIONAD O TIPO SPLINTÃO ID166 GO / AQUISIÇÃO 03 (TRÊS) UNIDADES DE VEÍC ULO DO TIPO VAN FURGÃO Component 3: Public Sect Request for Bid Single Stage - On 2020-10- 2021-04- 2020-10- 2021-05- 2020-11- 2021-06- 2020-12- 2021-07- 2021-01- 2021-08- 2021-03- 2021-12- IBRD / 82760 Post Open - National 161,016.95 174,081.24 Completed ENVIDRADO, ADAPTADOS or Management s e Envelope 14 22 19 20 18 02 18 15 22 17 23 03 PARA FUNCIONAREM COM O UNIDADES MÓVEIS DE FI SCALIZAÇÃO (´POSTOS FIS CAIS MÓVEIS) ID179 GO / AQUISIÇÃO EQ UIPAMENTOS DE GRANDE Component 2: Improving P Request for Bid Single Stage - On 2021-05- 2021-07- 2021-05- 2021-07- 2021-07- 2021-07- 2021-08- 2021-08- 2021-09- 2021-11- 2022-03- IBRD / 82760 Post Open - National 862,711.86 715,946.55 Signed PORTE PARA ESTRUTURAÇ ublic Services s e Envelope 19 15 24 15 05 23 04 24 08 06 07 ÃO DO HOSPITAL DA MULH ER ID163 GO-1 / AQUISIÇÃO D E VIATURAS TIPO MOTO AQ UÁTICA PARA UTILIZAÇÃO Component 2: Improving P Request for Bid Single Stage - On 2021-06- 2021-06- 2021-06- 2021-09- 2021-07- 2021-09- 2021-08- 2021-11- 2021-09- 2022-03- IBRD / 82760 Post Open - National 111,419.81 0.00 Canceled NO SERVIÇO DE GUARDA V ublic Services s e Envelope 09 25 14 20 26 30 25 18 29 28 IDAS OBJETIVANDO O REAP ARELHAMENTO DO CORPO DE BOMBEIROS MILITAR D O RN ID163 GO / AQUISIÇÃO DE VIATURAS TIPO MOTO AQU ÁTICA PARA UTILIZAÇÃO N Component 2: Improving P Request for Quo Single Stage - On 2020-10- 2020-12- 2021-03- IBRD / 82760 Post Open - National 91,365.35 0.00 Canceled O SERVIÇO DE GUARDA VI ublic Services tations e Envelope 19 14 14 DAS OBJETIVANDO O REAP ARELHAMENTO DO CORPO DE BOMBEIROS MILITAR D O ESTADO DO RN ID181 GO / AQUISIÇÃO DE EQUIPAMENTOS TECNOLÓ Component 3: Public Sect Request for Quo Single Stage - On 2021-06- 2021-08- 2021-08- 2022-02- 2021-10- GICOS PARA ESTRUTURAÇ IBRD / 82760 Post Open - National 44,479.06 41,230.88 Completed or Management tations e Envelope 30 25 26 21 29 ÃO DOS ESPAÇOS FÍSICOS FINANCIADOS PELO PROJET O GOVERNO CIDADÃO. ID183 GO / AQUISIÇÃO E I NSTALAÇÃO DE EQUIPAME NTOS PARA COMPLEMENTA Component 1: Sustainable Request for Quo Single Stage - On 2021-07- 2021-09- 2022-03- IBRD / 82760 Post Open - National 5,669.79 0.00 Signed ÇÃO DE SISTEMA DE TRAT Regional Development tations e Envelope 17 11 10 AMENTOS SIMPLIFICADO D E ABASTECIMENTO ÁGUA L OCALIZADOS EM COMUNID ADES RURAIS ID182 GO / AQUISIÇÃO DE EQUIPAMENTOS DE INFOR Component 3: Public Sect Request for Bid Single Stage - On 2021-07- 2021-08- 2021-07- 2021-08- 2021-08- 2021-09- 2021-09- 2021-11- 2021-11- 2022-03- 2022-04- MÁTICA PARA ESTRUTURA IBRD / 82760 Post Open - National 761,904.76 483,788.31 Signed or Management s e Envelope 12 09 17 31 28 13 27 11 01 05 30 ÇÃO DOS ESPAÇOS FÍSICO S FINANCIADOS PELO GOV ERNO CIDADÃO ID142 GO-2 / AQUISIÇÃO D E MATERIAL PERMANENTE Pending Im PARA O PROJETO DE FORT Component 1: Sustainable Request for Quo Single Stage - On 2021-07- 2021-09- 2021-10- IBRD / 82760 Post Open - National 4,190.48 0.00 plementati ALECIMENTO DA PECUÁRIO Regional Development tations e Envelope 19 13 23 on LEITEIRA, BOVINA E CAPRI NA DO ESTADO DO RN (LO TE 2 E L0TE 6) ID162 GO-1 / AQUISIÇÃO D E LANTERNA DE CAPACETE Component 2: Improving P Request for Quo Single Stage - On 2021-08- 2021-10- 2021-11- 2022-04- 2022-03- PARA COMBATE À INCÊNDI IBRD / 82760 Post Open - National 28,333.34 26,358.95 Completed ublic Services tations e Envelope 16 11 05 09 26 O FLORESTAL PARA O COR PO DE BOMBEIROS MILITAR DO RN ID137 2 GO / MATERIAL H Under Impl Component 2: Improving P Request for Bid Single Stage - On 2020-02- 2021-10- 2020-03- 2021-11- 2020-04- 2021-12- 2020-05- 2022-03- 2020-06- 2020-12- OSPITALAR E DIVERSOS PA IBRD / 82760 Post Open - National 428,943.75 0.00 ementatio ublic Services s e Envelope 28 21 04 25 15 15 15 14 19 16 RA O HOSPITAL DA MULHE n R (ACORDO MARCO) ID137 3 GO / MOBILIÁRIO Component 2: Improving P Request for Bid Single Stage - On 2020-02- 2021-10- 2020-03- 2021-11- 2020-04- 2021-12- 2020-05- 2022-03- 2020-06- 2022-05- 2020-12- HOSPITALAR PARA O HOSPI IBRD / 82760 Post Open - National 818,306.25 298,264.89 Signed ublic Services s e Envelope 28 21 04 25 15 09 15 17 19 26 16 TAL DA MULHER (ACORDO MARCO) ID102 GO / EQUIPAMENTO S PARA SERVIÇOS DE NUTR Under Impl Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2022-05- 2017-11- 2017-12- 2022-06- 2018-01- 2022-08- 2018-02- 2018-08- IÇÃO E DIETÉTICA E DEMAI IBRD / 82760 Post Open - National 625,000.00 0.00 ementatio ublic Services s e Envelope 27 12 01 13 03 12 05 16 15 S UTENSÍLIOS PARA O HOS n PITAL DA MULHER (ACORD O MARCO) ID106 GO / AQUISIÇÃO DE Under Impl Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2022-02- 2017-11- 2022-03- 2017-12- 2022-03- 2018-01- 2022-03- 2018-02- 2018-08- AMBULÂNCIAS PARA O HO IBRD / 82760 Post Open - National 95,937.50 0.00 ementatio ublic Services s e Envelope 27 14 01 04 13 17 12 18 16 15 SPITAL DA MULHER n ID101 GO / EQUIPAMENTO Under Impl Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2022-05- 2017-11- 2017-12- 2022-06- 2018-01- 2022-09- 2018-02- 2018-08- S DE TI PARA O HOSPITAL IBRD / 82760 Post Open - National 468,750.00 0.00 ementatio ublic Services s e Envelope 27 24 01 13 28 12 28 16 15 DA MULHER (ACORDO MAR n CO) ID98 GO / MOBILIÁRIO CO Under Impl Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2022-03- 2017-11- 2017-12- 2022-06- 2018-01- 2023-02- 2018-02- 2018-08- RPORATIVO PARA O HOSPI IBRD / 82760 Post Open - National 843,750.00 0.00 ementatio ublic Services s e Envelope 27 15 01 13 01 12 27 16 15 TAL DA MULHER (ACORDO n MARCO) ID105 GO / AQUISICAO DE Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2020-10- 2017-11- 2022-03- 2017-12- 2022-03- 2018-01- 2022-04- 2018-02- 2018-08- VEÍCULOS AUTOMOTORES IBRD / 82760 Post Open - National 46,875.00 0.00 Completed ublic Services s e Envelope 27 29 01 04 13 17 12 01 16 15 PARA O HOSPITAL DA MUL HER Page 5 ID104 GO / UTENSÍLIOS DE Under Impl Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2022-04- 2017-11- 2017-12- 2022-06- 2018-01- 2022-08- 2018-02- 2018-08- HOTELARIA HOSPITALAR P IBRD / 82760 Post Open - National 125,000.00 0.00 ementatio ublic Services s e Envelope 27 28 01 13 27 12 22 16 15 ARA O HOSPITAL DA MULH n ER (ACORDO MARCO) ID184 GO / EQUIPAMENTO Under Impl S MÉDICOS E DE LABORAT Component 2: Improving P Request for Bid Single Stage - On 2021-08- 2021-11- 2021-08- 2022-03- 2021-10- 2022-03- 2021-11- 2022-09- 2021-12- 2022-06- IBRD / 82760 Prior Open - National 3,809,310.00 0.00 ementatio ÓRIO PARA O HOSPITAL DA ublic Services s e Envelope 16 23 21 03 02 07 01 27 06 04 n MULHER (ACORDO MARCO) ID169 GO-1 / AQUISIÇÕES DE VEÍCULOS AUTOMOTOR ES PARA FORTALECIMENTO Component 3: Public Sect Request for Bid Single Stage - On 2021-08- 2021-12- 2021-08- 2021-12- 2021-09- 2022-01- 2021-09- 2022-05- 2021-10- 2021-12- IBRD / 82760 Prior Open - National 3,559,945.18 0.00 Signed DAS SECRETARIAS DA ADM or Management s e Envelope 05 04 10 28 09 04 24 09 23 07 INISTRAÇÃO DIRETA E ADM INISTRAÇÃO INDIRETA DO GOVERNO DO RN (ACORD O MARCO) ID180 GO / AQUISIÇÕES E INSTALAÇÕES DE USINAS F Component 3: Public Sect Request for Bid Single Stage - On 2021-06- 2021-11- 2021-06- 2021-12- 2021-07- 2021-12- 2021-08- 2022-04- 2021-09- 2022-06- 2021-10- IBRD / 82760 Post Open - National 752,000.00 800,068.03 Signed OTOVOLTAICAS NA ESCOL or Management s e Envelope 20 17 25 03 25 15 09 05 03 09 18 A DE GOVERNO E CENTRO ADMINISTRATIVO ID97 GO-1 / EQUIPAMENT OS E UTENSÍLIOS DIVERSO S PARA ÁREA DE ESTACION Component 2: Improving P Request for Bid Single Stage - On 2021-09- 2022-01- 2021-09- 2021-10- 2022-03- 2021-11- 2022-03- 2021-12- 2022-06- IBRD / 82760 Post Open - National 650,000.00 0.00 Canceled AMENTO, MANUTENÇÃO, S ublic Services s e Envelope 09 20 14 26 04 25 21 30 28 EGURANÇA E SERVIÇOS DE APOIO PARA O HOSPITAL D A MULHER (ACORDO MARC O) ID186 GO / AQUISIÇÃO DE Component 2: Improving P Request for Bid Single Stage - On 2021-09- 2021-09- 2021-10- 2021-11- 2021-12- 2022-06- EQUIPAMENTOS PARA LAB IBRD / 82760 Post Open - National 56,497.17 0.00 Canceled ublic Services s e Envelope 09 14 26 25 30 28 ORATÓRIO (LOTES 1, 2, 3 , 4, 6 e 7) ID191 GO / AQUISIÇÕES D E BARRACAS E OUTROS ITE Component 1: Sustainable Request for Bid Single Stage - On 2021-09- 2022-03- 2021-09- 2022-03- 2021-11- 2022-03- 2021-12- 2022-06- 2022-01- 2022-07- IBRD / 82760 Post Open - National 254,237.29 0.00 Completed NS PARA O PROJETO DE FEI Regional Development s e Envelope 15 07 20 21 01 31 01 01 05 04 RAS DA AGRICULTURA FAM ILIAR ID97 GO / EQUIPAMENTOS Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2021-09- 2017-11- 2021-10- 2017-12- 2021-10- 2018-01- 2021-11- 2018-02- 2018-08- DE LAVANDERIA PARA O H IBRD / 82760 Post Open - National 670,000.00 0.00 Signed ublic Services s e Envelope 27 27 01 15 13 27 12 26 16 15 OSPITAL DA MULHER ID157 GO-1 / AQUISIÇÕES DE EQUIPAMENTOS DE BIO Component 2: Improving P Request for Bid Single Stage - On 2021-09- 2021-10- 2021-10- 2021-11- 2021-11- 2021-11- 2021-12- 2021-12- 2022-01- 2022-07- MÉTRICO PARA CONFECÇà IBRD / 82760 Post Open - National 225,988.70 0.00 Signed ublic Services s e Envelope 27 18 02 11 13 26 13 09 17 16 O DE IDENTIDADE CIVIL EM TODO ESTADO DO RN (LOT E 2) ID187 GO / AQUISIÇÃO DE EQUIPAMENTOS DE GEOPR Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-02- 2022-05- 2022-04- OCESSAMENTO PARA DAR IBRD / 82760 Post Open - National 20,715.63 17,684.46 Completed or Management tations e Envelope 20 15 02 14 25 SUPORTE ÀS ATIVIDADES D E GESTÃO DOS RECURSOS HÍDRICOS DO RN ID188 GO / AQUISIÇÃO DE EQUIPAMENTOS DE MONIT Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-04- 2022-05- ORAMENTO QUATITATIVO P IBRD / 82760 Post Open - National 24,482.11 21,377.45 Signed or Management tations e Envelope 20 15 19 14 ARA DAR SUPORTE ÀS ATIV IDADES DE GESTÃO DOS R ECURSOS HÍDRICOS DO RN ID190 GO / AQUISIÇÃO DE EQUIPAMENTOS DE MONIT ORAMENTO QUATITATIVO P Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05- 2022-05- 2022-06- ARA MEDIR EM TEMPO REA IBRD / 82760 Post Open - National 21,092.28 27,837.15 Completed or Management tations e Envelope 20 15 26 14 28 L O NÍVEL DOS RESERVATÓ RIOS P/ FORTALECIMENTO DA GESTÃO PÚBLICA NO S ETOR DE RECURSOS HÍDRI COS DO RN ID189 GO / AQUISIÇÃO DE EQUIPAMENTOS DE FISCALI Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-02- 2022-05- ZAÇÃO PARA DAR SUPORT IBRD / 82760 Post Open - National 11,299.43 2,634.14 Signed or Management tations e Envelope 20 15 17 14 E ÀS ATIVIDADES DE GEST ÃO DOS RECURSOS HÍDRIC OS DO RN ID193 GO / AQUISIÇÃO DE MÁQUINA AGRÍCOLA – TIPO Component 1: Sustainable Request for Quo Single Stage - On 2021-10- 2021-11- 2022-05- IBRD / 82760 Post Open - National 65,913.38 0.00 Signed TRATOR PARA UNIDADES E Regional Development tations e Envelope 05 30 29 XPERIMENTAIS DA EMPARN ID194 GO / AQUISIÇÃO DE Component 1: Sustainable Request for Bid Single Stage - On Pending Im 2021-10- 2021-10- 2021-11- 2021-12- 2022-01- 2022-07- IBRD / 82760 Post Open - National 208,097.93 0.00 MÁQUINA COLHEITADEIRA Regional Development s e Envelope plementati 04 09 20 20 24 23 DE ARROZ on ID195 GO / AQUISIÇÃO DE EQUIPAMENTOS PARA EST Component 1: Sustainable Request for Quo Single Stage - On 2021-10- 2021-12- 2022-05- 2022-06- IBRD / 82760 Post Open - National 22,598.87 7,368.36 Signed AÇÃO DE PISCICULTURA ES Regional Development tations e Envelope 09 04 15 02 TEVÃO DE OLIVEIRA, EM C AICÓ/RN ID196 GO / AQUISIÇÃO DE EQUIPAMENTOS PARA DE I Component 1: Sustainable Request for Quo Single Stage - On 2021-11- 2021-12- 2022-06- 2022-06- IBRD / 82760 Post Open - National 94,161.96 103,609.27 Completed RRIGAÇÃO PARA UNIDADE Regional Development tations e Envelope 02 28 23 26 EXPERIMENTAL DE IPANGU ASSU – EMPARN/RN ID155 GO-1 / AQUISIÇÕES DE EQUIPAMENTOS DE PR Component 2: Improving P Request for Bid Single Stage - On 2021-11- 2021-12- 2021-11- 2021-12- 2021-12- 2021-12- 2022-01- 2022-03- 2022-02- 2022-08- IBRD / 82760 Post Open - National 199,894.54 0.00 Canceled OTEÇÃO INDIVIDUAL (EPI´s ublic Services s e Envelope 03 03 08 17 20 22 19 10 23 22 ) PARA ENFRENTAMENTO D A COVID-19 ID 117 2 GO / ACORDO MA RCO PARA AQUISIÇÃO, MO Under Impl NTAGEM E INSTALAÇÃO DE Component 2: Improving P Request for Bid Single Stage - On 2020-11- 2021-11- 2020-11- 2021-11- 2020-12- 2021-12- 2021-01- 2022-06- 2021-02- 2021-03- IBRD / 82760 Post Open - National 166,935.65 0.00 ementatio MOBILIÁRIO PARA REORGA ublic Services s e Envelope 25 17 30 17 30 01 14 20 18 30 n NIZAÇÃO ESTRUTURAL DE 46 ESCOLAS DA REDE EST ADUAL DE ENSINO (LOTE 2 ) ID185 GO / AQUISIÇÃO DE Under Impl Component 2: Improving P Request for Bid Single Stage - On 2021-09- 2021-12- 2021-09- 2022-01- 2021-10- 2022-02- 2021-11- 2022-03- 2021-12- 2022-06- EQUIPAMENTOS MÉDICO-H IBRD / 82760 Post Open - National 131,826.74 0.00 ementatio ublic Services s e Envelope 09 06 14 24 26 02 25 22 30 28 OSPITALARES E BANCO DE n LEITE ID197 GO / AQUISIÇÃO DE MICROCOMPUTADORES E I Under Impl Component 2: Improving P Request for Quo Single Stage - On 2021-11- 2022-01- 2022-07- MPRESSORAS PARA 3ª CO IBRD / 82760 Post Open - National 5,838.04 0.00 ementatio ublic Services tations e Envelope 21 16 15 MPANHIA DE POLÍCIA MILIT n AR DO 8º BPM, NO MUNICÍ PIO DE PASSA E FICA ID198 GO / AQUISIÇÃO DE MOBILIÁRIO E ELETRODOM Component 2: Improving P Request for Quo Single Stage - On 2021-11- 2022-01- 2022-07- ÉSTICOS PARA 3ª COMPAN IBRD / 82760 Post Open - National 7,277.97 0.00 Signed ublic Services tations e Envelope 21 16 15 HIA DE POLÍCIA MILITAR D O 8º BPM, NO MUNICÍPIO D E PASSA E FICA ID152 GO / AQUISIÇÕES D Under Impl Component 3: Public Sect Request for Bid Single Stage - On 2020-09- 2022-01- 2020-10- 2022-02- 2020-11- 2022-03- 2020-12- 2022-04- 2021-01- 2021-03- E MOBILIÁRIO E ELETRODO IBRD / 82760 Post Open - National 75,995.09 0.00 ementatio or Management s e Envelope 30 27 05 21 16 08 16 04 20 21 MÉSTICO PARA O POSTO FI n SCAL DE CARAU - RN ID156 GO / AQUISIÇÕES D Under Impl E EQUIPAMENTOS DE TI PA Component 3: Public Sect Request for Bid Single Stage - On 2020-09- 2021-12- 2020-10- 2022-02- 2020-11- 2022-02- 2020-12- 2022-06- 2021-01- 2021-03- IBRD / 82760 Post Open - National 381,183.41 0.00 ementatio RA O POSTO FISCAL DE CA or Management s e Envelope 30 29 05 10 16 23 16 22 14 15 n RAU - RN (ACORDO MARCO ) ID199 GO / AQUISIÇÃO DE Under Impl SOFTWARE DE GESTÃO PA Component 2: Improving P Request for Quo Single Stage - On 2021-11- 2022-01- 2022-07- IBRD / 82760 Post Open - National 94,632.77 0.00 ementatio RA O LABORATÓRIO DE AN ublic Services tations e Envelope 22 17 16 n ATOMOHISTOCITOPATOLO GIA ID200 GO / AQUISIÇÃO DE Component 1: Sustainable Request for Bid Single Stage - On 2021-11- 2021-11- 2021-11- 2022-01- 2022-01- 2022-01- 2022-02- 2022-02- 2022-03- 2022-09- IBRD / 82760 Post Open - National 182,203.39 0.00 Canceled MÁQUINA DE FORRAGEM C Regional Development s e Envelope 18 30 23 11 04 24 03 21 10 06 OM REBOQUE ID163 GO-2 / AQUISIÇÃO D E VIATURAS TIPO MOTO AQ UÁTICA PARA UTILIZAÇÃO Component 2: Improving P Request for Bid Single Stage - On 2021-11- 2022-05- 2021-11- 2022-01- 2022-05- 2022-02- 2022-05- 2022-03- 2022-09- IBRD / 82760 Post Open - National 141,242.94 0.00 Signed NO SERVIÇO DE GUARDA V ublic Services s e Envelope 18 06 23 04 23 03 27 10 06 IDAS OBJETIVANDO O REAP ARELHAMENTO DO CORPO DE BOMBEIROS MILITAR D O RN ID182 GO-1 / AQUISIÇÃO D E EQUIPAMENTOS DE INFO Component 3: Public Sect Request for Quo Single Stage - On 2021-12- 2022-01- 2022-06- 2022-07- 2022-09- RMÁTICA PARA ESTRUTUR IBRD / 82760 Post Open - National 7,011.05 10,237.96 Completed or Management tations e Envelope 04 29 04 28 13 AÇÃO DOS ESPAÇOS FÍSIC OS FINANCIADOS PELO PR OJETO GOVERNO CIDADÃO ID201 GO / AQUISIÇÃO DE Pending Im Component 1: Sustainable Request for Bid Single Stage - On 2021-11- 2021-12- 2022-01- 2022-02- 2022-03- 2022-09- EQUIPAMENTOS DE MANUT IBRD / 82760 Prior Open - National 2,824,858.76 0.00 plementati Regional Development s e Envelope 30 05 16 15 22 18 ENÇÃO E SINALIZAÇÃO DE on RODOVIAS ID158 GO-2 / AQUISIÇÃO D Component 2: Improving P Request for Bid Single Stage - On 2022-01- 2022-06- 2022-03- 2022-03- 2022-07- 2022-03- 2022-07- 2022-04- 2022-08- 2022-08- E VIATURAS DUAS RODAS IBRD / 82760 Post Open - National 798,000.00 466,626.85 Signed ublic Services s e Envelope 30 14 01 09 07 14 14 18 20 16 ESTILO TRAIL (RELICITAÇà O) ID96 1 GO / AQUISIÇÃO DE INSTRUMENTAIS CIRÚRGIC Component 2: Improving P Request for Bid Single Stage - On 2022-02- 2022-01- 2022-02- 2022-02- 2022-03- 2022-02- 2022-04- 2022-03- 2022-05- 2022-11- OS PARA HOSPITAIS REGIO IBRD / 82760 Post Open - National 1,035,781.54 0.00 Canceled ublic Services s e Envelope 03 26 08 10 22 22 21 17 26 22 NAIS, LABORATÓRIO E HOS PITAL DA MULHER (ACORD O MARCO) ID103 GO / AQUISICAO DE Under Impl INSTRUMENTAL CIRÚRGICO Component 2: Improving P Request for Bid Single Stage - On 2022-02- 2022-06- 2022-02- 2022-03- 2022-07- 2022-04- 2022-10- 2022-05- 2022-11- IBRD / 82760 Post Open - National 941,619.58 0.00 ementatio PARA O HOSPITAL DA MUL ublic Services s e Envelope 03 14 08 22 22 21 14 26 22 n HER (ACORDO MARCO) ID 205 GO / FORNECIMENT O E INSTALAÇÃO DE USINA Component 1: Sustainable Request for Bid Single Stage - On 2022-02- 2022-04- 2022-03- 2022-03- 2022-05- 2022-03- 2022-06- 2022-05- 2022-08- IBRD / 82760 Post Open - National 235,404.90 0.00 Signed S FOTOVOLTAICAS EM COM Regional Development s e Envelope 28 19 05 15 19 30 22 09 07 UNIDADES RURAIS - REGIà O CENTRAL ID 207 GO / FORNECIMENT O E INSTALAÇÃO DE USINA Component 1: Sustainable Request for Bid Single Stage - On 2022-02- 2022-04- 2022-03- 2022-03- 2022-05- 2022-04- 2022-06- 2022-05- 2022-07- 2022-08- IBRD / 82760 Post Open - National 273,069.68 333,806.06 Signed S FOTOVOLTAICAS EM COM Regional Development s e Envelope 27 19 14 24 20 08 20 18 23 16 UNIDADES RURAIS - REGIà O OESTE ID 206 GO / FORNECIMENT O E INSTALAÇÃO DE USINA Component 1: Sustainable Request for Bid Single Stage - On 2022-02- 2022-04- 2022-03- 2022-03- 2022-05- 2022-04- 2022-06- 2022-05- 2022-08- IBRD / 82760 Post Open - National 197,740.11 0.00 Signed S FOTOVOLTAICAS EM COM Regional Development s e Envelope 20 19 07 17 20 01 27 11 09 UNIDADES RURAIS - REGIà O LESTE ID 203 GO / AQUISIÇÃO E I Under Impl NSTALAÇÃO DE EQUIPAME Component 2: Improving P Request for Bid Single Stage - On 2022-02- 2022-05- 2022-02- 2022-02- 2022-06- 2022-03- 2022-06- 2022-04- 2022-07- IBRD / 82760 Post Open - National 274,000.00 0.00 ementatio NTOS PARA SONORIZAÇÃO ublic Services s e Envelope 03 12 08 18 15 20 29 20 19 n DO HOSPITAL DA MULHER ID208 GO / AQUISIÇÃO DE EQUIPAMENTOS, SOFWARE S E DEMAIS SERVIÇOS NEC Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2022-02- 2022-04- 2022-10- ESSÁRIOS À IMPLANTAÇÃO IBRD / 82760 Post Open - National 35,196.32 0.00 plementati Regional Development tations e Envelope 14 11 08 DE SISTEMA DE VÍDEO MO on NITORAMENTO ip, PARA AT ENDER ÀS DEMANDAS DO PARQUE TECNOLÓGICO DO RN ID209 GO / AQUISIÇÃO DE EQUIPAMENTOS PARA SIST Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2022-02- 2022-04- 2022-10- EMA DE CABEAMENTO EST IBRD / 82760 Post Open - National 93,074.62 0.00 plementati Regional Development tations e Envelope 14 11 08 RUTURADO, PARA ATENDE on R ÀS DEMANDAS DO PARQ UE TECNOLÓGICO DO RN ID210 GO / AQUISIÇÃO DE Under Impl MÁQUINAS E IMPLEMENTO Component 1: Sustainable Request for Quo Single Stage - On 2022-03- 2022-05- 2022-11- IBRD / 82760 Post Open - National 93,126.11 0.00 ementatio S PRODUTIVOS PARA BENE Regional Development tations e Envelope 12 07 03 n FICIAMENTO DAS AGROIND ÚSTRIAS ID211 GO / AQUISIÇÃO DE Under Impl Component 1: Sustainable Request for Quo Single Stage - On 2022-03- 2022-05- 2022-11- EQUIPAMENTOS DIVERSOS IBRD / 82760 Post Open - National 93,275.33 0.00 ementatio Regional Development tations e Envelope 12 07 03 PARA BENEFICIAMENTO DA n S AGROINDÚSTRIAS ID151 GO-1 / AQUISIÇÃO D E MOBILIÁRIO PARA ATEND Component 1: Sustainable Request for Bid Single Stage - On 2022-02- 2022-01- 2022-03- 2022-04- 2022-02- 2022-05- 2022-05- 2022-06- 2022-07- 2022-12- ER AS DEMANDAS DE IMPL IBRD / 82760 Post Open - National 154,641.76 193,249.92 Completed Regional Development s e Envelope 25 11 02 13 22 13 30 17 30 14 ANTAÇÃO DA PRIMEIRA ET APA DO PARQUE TECNOLÓ GICO DO RN AUGUSTO SEV ERO ID200 GO-1 / AQUISIÇÃO D Under Impl Component 1: Sustainable Request for Bid Single Stage - On 2022-03- 2022-04- 2022-03- 2022-05- 2022-05- 2022-06- 2022-06- 2022-07- 2022-09- E MÁQUINA DE FORRAGEM IBRD / 82760 Post Open - National 231,079.70 0.00 ementatio Regional Development s e Envelope 21 12 26 07 19 06 09 11 09 COM REBOQUE n ID96 1 GO-2 / AQUISIÇÃO DE INSTRUMENTAIS CIRÚR Under Impl Component 2: Improving P Request for Bid Single Stage - On 2022-03- 2022-05- 2022-04- 2022-05- 2022-06- 2022-06- 2022-11- 2022-07- 2023-01- GICOS PARA HOSPITAIS RE IBRD / 82760 Post Open - National 1,035,781.54 0.00 ementatio ublic Services s e Envelope 28 17 02 14 22 13 04 18 14 GIONAIS, LABORATÓRIO E n HOSPITAL DA MULHER (AC ORDO MARCO) RELICITAÇà O ID185 GO-1 / AQUISIÇÃO D Under Impl Component 2: Improving P Request for Bid Single Stage - On 2022-03- 2022-05- 2022-04- 2022-05- 2022-06- 2022-06- 2022-08- 2022-07- 2022-11- E EQUIPAMENTOS MÉDICO- IBRD / 82760 Post Open - National 124,233.17 0.00 ementatio ublic Services s e Envelope 31 24 05 17 30 16 08 21 18 HOSPITALARES E BANCO D n E LEITE ID137 2 GO-1 / MATERIAL Under Impl Component 2: Improving P Request for Bid Single Stage - On 2022-03- 2022-05- 2022-04- 2022-05- 2022-06- 2022-06- 2022-07- 2022-07- 2022-10- HOSPITALAR E DIVERSOS P IBRD / 82760 Post Open - National 215,733.19 0.00 ementatio ublic Services s e Envelope 31 16 05 17 20 16 28 21 19 ARA O HOSPITAL DA MULH n ER (ACORDO MARCO) ID137 3 GO-1 / MOBILIÁRI Under Impl Component 2: Improving P Request for Bid Single Stage - On 2022-03- 2022-05- 2022-04- 2022-05- 2022-06- 2022-06- 2022-11- 2022-07- 2022-11- O HOSPITALAR PARA O HO IBRD / 82760 Post Open - National 309,120.17 0.00 ementatio ublic Services s e Envelope 31 12 05 17 15 16 01 21 18 SPITAL DA MULHER (ACOR n DO MARCO) ID212 GO / AQUISIÇÃO DE Under Impl EQUIPAMENTOS E FERRAM Component 2: Improving P Request for Quo Single Stage - On 2022-04- 2022-05- 2022-11- IBRD / 82760 Post Open - National 14,388.74 0.00 ementatio ENTAS PARA MANUTENÇÃO ublic Services tations e Envelope 05 31 27 n DO HOSPITAL DA MULHER ID213 GO / AQUISIÇÃO DE Under Impl Component 2: Improving P Request for Quo Single Stage - On 2022-04- 2022-05- 2022-11- MATERIAS DE LIMPEZA PAR IBRD / 82760 Post Open - National 96,774.82 0.00 ementatio ublic Services tations e Envelope 05 31 27 A HOSPITAL DA MULHER n ID214 GO / AQUISIÇÃO DE Under Impl Component 2: Improving P Request for Quo Single Stage - On 2022-04- 2022-05- 2022-11- LAVANDERIA E COSTURA P IBRD / 82760 Post Open - National 4,079.55 0.00 ementatio ublic Services tations e Envelope 05 31 27 ARA HOSPITAL DA MULHER n ID215 GO / AQUISIÇÃO DE Component 2: Improving P Request for Bid Single Stage - On Under Impl 2022-03- 2022-05- 2022-04- 2022-05- 2022-06- 2022-06- 2023-03- 2022-07- 2022-11- IBRD / 82760 Post Open - National 545,461.25 0.00 ENXOVAL PARA HOSPITAL ublic Services s e Envelope ementatio 31 12 05 17 21 16 14 21 18 DA MULHER n ID216 GO / MÓVEIS PROJE Component 2: Improving P Request for Bid Single Stage - On Under Impl 2022-04- 2022-05- 2022-04- 2022-05- 2022-06- 2022-06- 2022-10- 2022-08- 2022-11- IBRD / 82760 Post Open - National 781,250.00 0.00 TADOS PARA O HOSPITAL ublic Services s e Envelope ementatio 11 16 16 28 15 27 27 01 29 DA MULHER n ID217 GO / MOBILIÁRIO SO Under Impl Component 2: Improving P Request for Quo Single Stage - On 2022-04- 2022-06- 2022-12- B MEDIDA PARA O LABORA IBRD / 82760 Post Open - National 56,497.18 0.00 ementatio ublic Services tations e Envelope 16 11 08 TÓRIO DE ANATOHISTOPAT n OLOGIA ID218 GO / AQUISIÇÃO DE MOBILIÁRIO (CONJUNTO AL Component 2: Improving P Request for Bid Single Stage - On 2022-04- 2022-07- 2022-05- 2022-07- 2022-06- 2022-07- 2022-07- 2022-08- 2022-08- 2022-11- UNO) PARA REORGANIZAÇ IBRD / 82760 Prior Open - National 2,158,020.00 0.00 Signed ublic Services s e Envelope 28 13 03 15 02 28 02 05 06 04 ÃO ESTRUTURAL DE 48 ES COLAS DA REDE ESTADUAL DE ENSINO ID219 GO / AQUISIÇÕES E Under Impl INSTALAÇÕES DE USINAS F Component 2: Improving P Request for Bid Single Stage - On 2022-05- 2022-06- 2022-05- 2022-06- 2022-07- 2022-06- 2022-07- 2022-08- 2022-11- IBRD / 82760 Post Open - National 70,790.85 0.00 ementatio OTOVOLTAICAS IN-GRID PA ublic Services s e Envelope 09 07 14 13 07 28 18 02 30 n RA O LABORATÓRIO DE AN ATOMOCITOPATOLOGIA ID220 GO / AQUISIÇÕES E Under Impl INSTALAÇÕES DE USINAS F Component 2: Improving P Request for Bid Single Stage - On 2022-05- 2022-06- 2022-05- 2022-06- 2022-07- 2022-06- 2022-08- 2022-08- 2022-11- IBRD / 82760 Post Open - National 207,653.15 0.00 ementatio OTOVOLTAICAS IN-GRID PA ublic Services s e Envelope 09 15 14 13 23 28 08 02 30 n RA O HOSPITAL DE MULHE R EM MOSSORÓ ID137 1 GO / AQUISIÇÃO D E MODELOS E SIMULADOR Component 2: Improving P Request for Bid Single Stage - On 2020-02- 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- IBRD / 82760 Post Open - National 45,000.00 0.00 Canceled ES EDUCACIONAIS PARA O ublic Services s e Envelope 28 04 15 15 19 16 HOSPITAL DA MULHER ID137 1 GO-1 / AQUISIÇÃO Pending Im DE MODELOS E SIMULADO Component 2: Improving P Request for Quo Single Stage - On 2022-06- 2022-08- 2022-12- IBRD / 82760 Post Open - National 45,000.00 0.00 plementati RES EDUCACIONAIS PARA ublic Services tations e Envelope 13 08 06 on O HOSPITAL DA MULHER ID221 GO / AQUISICAO DE INSTRUMENTAL CIRÚRGICO Component 2: Improving P Request for Quo Single Stage - On 2022-06- 2022-08- 2022-11- IBRD / 82760 Post Open - National 8,997.59 0.00 Signed PARA O LABORATÓRIO DE ublic Services tations e Envelope 15 10 08 ANATOMIA PATALÓGICA ID222 GO / AQUISIÇÃO DE MESA E CADEIRA PARA ESC Under Impl Component 2: Improving P Request for Quo Single Stage - On 2022-06- 2022-08- 2022-11- RITÓRIO PARA 3ª COMPAN IBRD / 82760 Post Open - National 2,042.30 0.00 ementatio ublic Services tations e Envelope 19 14 12 HIA DE POLÍCIA MILITAR D n O 8º BPM, NO MUNICÍPIO D E PASSA E FICA ID169 GO-2 / AQUISIÇÕES DE VEÍCULOS AUTOMOTOR ES PARA FORTALECIMENTO Under Impl Component 3: Public Sect Request for Bid Single Stage - On 2022-06- 2022-06- 2022-06- 2022-07- 2022-07- 2022-07- 2022-08- 2022-08- 2022-11- DAS SECRETARIAS DA ADM IBRD / 82760 Post Open - National 1,870,000.00 0.00 ementatio or Management s e Envelope 21 27 26 11 26 21 08 25 23 INISTRAÇÃO DIRETA E ADM n INISTRAÇÃO INDIRETA DO GOVERNO DO RN (RELICIT AÇÃO DOS LOTES 1 e 4)) ID152 GO-1 / AQUISIÇÕES DE MOBILIÁRIO E ELETROD Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-08- 2022-11- 2022-12- IBRD / 82760 Post Open - National 17,930.00 0.00 Completed OMÉSTICO PARA O POSTO or Management tations e Envelope 05 30 28 29 FISCAL DE CARAU - RN (RE LICITAÇÃO) Page 6 ID223 GO / AQUISIÇÕES D E MICROCOMPUTADOR WO Under Impl Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-08- 2022-11- RKSTATION PARA DESENV IBRD / 82760 Post Open - National 72,000.00 0.00 ementatio or Management tations e Envelope 05 30 28 OLVIMENTO DE MALHAS FI n SCAIS PARA O POSTO FISC AL DE CARAU - RN ID224 GO / TABLET PROFI SSIONAL PARA O USO EM F Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- IBRD / 82760 Post Open - National 21,000.00 0.00 Completed ISCALIZAÇÕES DE TRÂNSIT or Management tations e Envelope 09 03 02 O E USO NO NIFF PARA O P OSTI FISCAL DE CARAÚ - R N ID225 GO / ESTABILIZADO Under Impl RES DE TENSÃO NOBREAK Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- IBRD / 82760 Post Open - National 32,400.00 0.00 ementatio DE 1,2 KVA PARA O POSTO or Management tations e Envelope 09 03 02 n FISCAL DE CARAÚ - RN ID226 GO / IMPRESSORAS Under Impl MULTIFUNCIONAL LASE (SC Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2023-03- IBRD / 82760 Post Open - National 27,000.00 0.00 ementatio ANNER, IMPRESSORA E CO or Management tations e Envelope 09 03 02 n PIADORA) PARA O POSTO F ISCAL DE CARAÚ - RN ID227 GO / ESTABILIZADO Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- RES DE 2 KVA PARA O POS IBRD / 82760 Post Open - National 9,000.00 0.00 Completed or Management tations e Envelope 09 03 02 TO FISCAL DE CARAÚ - RN ID228 GO / SWITCH PARA I NTERLIGAÇÃO INTERNA DO Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- IBRD / 82760 Post Open - National 90,000.00 0.00 Completed S EQUIPAMENTOS DO NIFF or Management tations e Envelope 09 03 02 E CÂMERAS OCR PARA O P OSTO FISCAL DE CARAÚ - R N ID229 GO / SWITCH PARA I NTERLIGAÇÃO DO NIFF CO Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- M FIBRA DE INTERNET DO IBRD / 82760 Post Open - National 24,000.00 0.00 Completed or Management tations e Envelope 09 03 02 PROVEDOR EXTERNO PARA O POSTO FISCAL DE CARAÚ - RN ID230 GO / SERVIDOR PAR Under Impl Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- A O DATACENTER DO NIFF IBRD / 82760 Post Open - National 14,000.00 0.00 ementatio or Management tations e Envelope 09 03 02 PARA O POSTO FISCAL DE n CARAÚ - RN ID231 GO / EQUIPAMENTO S DE REDE SEM FIO ACESS Pending Im Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- POINT PARA QUE O NIFF PO IBRD / 82760 Post Open - National 28,800.00 0.00 plementati or Management tations e Envelope 09 03 02 SSUA REDE INTERNET PAR on A O POSTO FISCAL DE CAR AÚ - RN ID233 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- EQUIPAMENTOS PARA CME IBRD / 82760 Post Open - National 26,402.08 0.00 Signed ublic Services tations e Envelope 11 05 04 PARA HOSPITAL DA MULHE R ID237 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- EQUIPAMENTOS DE AUXILI IBRD / 82760 Post Open - National 73,054.20 0.00 Signed ublic Services tations e Envelope 11 05 04 O RESPIRATÓRIO PARA HO SPITAL DA MULHER ID242 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- CORTINAS HOSPITALARES IBRD / 82760 Post Open - National 90,100.00 0.00 Signed ublic Services tations e Envelope 11 05 04 PARA HOSPITAL DA MULHE R ID243 GO / AQUISIÇÃO DE Pending Im Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- SISTEMA DE VÍDEO MONIT IBRD / 82760 Post Open - National 84,000.00 0.00 plementati ublic Services tations e Envelope 11 05 04 ORAMENTO PARA HOSPITA on L DA MULHER ID244 GO / AQUISIÇÃO DE ARMÁRIOS E BELICHE DE A Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- 2022-12- ÇO PARA 3ª COMPANHIA D IBRD / 82760 Post Open - National 1,724.43 0.00 Completed ublic Services tations e Envelope 23 17 16 23 E POLÍCIA MILITAR DO 8º B PM, NO MUNICÍPIO DE PAS SA E FICA ID245 GO / AQUISIÇÃO DE MICROCOMPUTADORESTIP Component 3: Public Sect Request for Bid Single Stage - On 2022-07- 2022-09- 2022-07- 2022-08- 2022-10- 2022-09- 2022-11- 2022-10- 2022-12- IBRD / 82760 Post Open - National 261,944.00 0.00 Signed O ESTAÇÃO DE TRABALHO or Management s e Envelope 26 12 31 30 10 14 09 19 18 E NOTEBOOKS PARA SECR ETARIA DE TRIBUTAÇÃO ID246 GO / AQUISIÇÃO DE VEÍCULO AUTOMOTORES, Component 3: Public Sect Request for Bid Single Stage - On 2022-07- 2022-09- 2022-07- 2022-08- 2022-09- 2022-08- 2022-10- 2022-09- 2022-12- IBRD / 82760 Post Open - National 180,000.00 0.00 Completed MODELO PICK-UP CABINE D or Management s e Envelope 26 12 31 15 30 30 14 28 27 UPLA PARA SECRETARIA D E TRIBUTAÇÃO ID247 GO / AQUISIÇÃO DE EQUIPAMENTOS PARA SIST Pending Im Component 3: Public Sect Request for Bid Single Stage - On 2022-07- 2022-07- 2022-08- 2022-09- 2022-10- 2022-12- EMA PORTÁTIL E DINÂMICO IBRD / 82760 Post Open - National 180,714.89 0.00 plementati or Management s e Envelope 26 31 30 14 19 18 DE PESAGEM DE VEÍCULOS on PARA SECRETARIA DE TRI BUTAÇÃO ID248 GO / AQUISIÇÃO DE EQUIPAMENTOS DE SINALI Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- IBRD / 82760 Post Open - National 30,000.00 0.00 Completed ZAÇÃO E FISCALIZAÇÃO PA or Management tations e Envelope 31 25 24 RA POSTO MÓVEIS PARA S ECRETARIA DE TRIBUTAÇà O ID249 GO / AQUISIÇÃO DE PAINEL INTERATIVO INDOO Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-10- 2022-12- IBRD / 82760 Post Open - National 91,600.00 0.00 Completed R TOUCHSCREEN PARA SAL or Management tations e Envelope 31 05 04 A DE SITUAÇÃO PARA SECR ETARIA DE TRIBUTAÇÃO ID250 GO / AQUISIÇÃO DE TV´s E MONITOR 65 PARA Component 3: Public Sect Request for Quo Single Stage - On 2022-07- 2022-10- 2022-12- 2023-01- IBRD / 82760 Post Open - National 84,800.00 0.00 Completed SALA DE REUNIÃO VIRTUAL or Management tations e Envelope 31 05 04 30 PARA SECRETARIA DE TRI BUTAÇÃO ID251 GO / AQUISIÇÃO DE EQUIPAMENTOS PARA ARM Component 3: Public Sect Request for Bid Single Stage - On 2022-07- 2022-09- 2022-07- 2022-08- 2022-10- 2022-09- 2022-10- 2022-10- 2022-12- 2023-03- AZENAMENTO E PROCESSA IBRD / 82760 Post Open - National 840,000.00 0.00 Completed or Management s e Envelope 26 12 31 30 17 14 26 19 18 02 MENTO DA INFRAESTRUTU RA DE DATACENTER PARA SECRETARIA DE TRIBUTAÇ ÃO ID252 GO / AQUISIÇÃO DE Under Impl EQUIPAMENTOS PARA CEN Component 2: Improving P Request for Bid Single Stage - On 2022-07- 2022-09- 2022-08- 2022-08- 2022-09- 2022-08- 2022-10- 2022-09- 2022-12- IBRD / 82760 Post Open - National 651,898.69 0.00 ementatio TRO CIRÚRGICO E UTI DO ublic Services s e Envelope 28 05 02 17 19 27 18 20 19 n HOSPITAL DA MULHER (RE LICITAÇÃO) ID195 GO-1 / AQUISIÇÃO D E EQUIPAMENTOS PARA ES Component 1: Sustainable Request for Quo Single Stage - On 2022-08- 2022-10- 2022-12- TAÇÃO DE PISCICULTURA E IBRD / 82760 Post Open - National 20,320.00 0.00 Signed Regional Development tations e Envelope 06 01 30 STEVÃO DE OLIVEIRA, EM CAICÓ/RN - LOTES REMANE SCENTE (RELICITAÇÃO) ID253 GO / AQUISIÇÃO DE Component 1: Sustainable Request for Quo Single Stage - On 2022-08- 2022-10- 2022-12- MÁQUINAS PARA AGROIND IBRD / 82760 Post Open - National 17,000.00 0.00 Signed Regional Development tations e Envelope 06 01 30 ÚSTRIAS (RELICITAÇÃO) ID254 GO / AQUISIÇÃO DE Under Impl EQUIPAMENTOS PARA PRO Component 1: Sustainable Request for Quo Single Stage - On 2022-08- 2022-10- 2022-12- IBRD / 82760 Post Open - National 99,725.00 0.00 ementatio CESSAMENTO DE LEITE E D Regional Development tations e Envelope 06 01 30 n ERIVADOS (RELICITAÇÃO) ID255 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2022-08- 2022-09- 2022-12- MOBILIÁRIO PARA NECROT IBRD / 82760 Post Open - National 7,000.00 0.00 Signed ublic Services tations e Envelope 13 27 26 ÉRIO PARA HOSPITAL DO M ULHER (RELICITAÇÃO) ID241 GO-1 / AQUISIÇÃO D Component 2: Improving P Request for Quo Single Stage - On 2022-08- 2022-09- 2022-12- E UTENSÍLIOS DE COZINHA IBRD / 82760 Post Open - National 42,000.00 0.00 Signed ublic Services tations e Envelope 13 27 26 PARA HOSPITAL DE MULHE R (RELICITAÇÃO) ID234 GO / AQUISIÇÃO DE EQUIPAMENTOS MÉDICO H Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- IBRD / 82760 Post Open - National 99,875.89 0.00 Signed OSPITALAR E ESTATIVA PA ublic Services tations e Envelope 11 05 04 RA HOSPITAL DA MULHER ID235 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- EQUIPAMENTOS DE GINEC IBRD / 82760 Post Open - National 61,344.00 0.00 Signed ublic Services tations e Envelope 11 05 04 OLOGIA PARA HOSPITAL D A MULHER ID236 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- EQUIPAMENTOS NEONATO IBRD / 82760 Post Open - National 74,414.63 0.00 Signed ublic Services tations e Envelope 11 05 04 LOGIA PARA HOSPITAL DA MULHER ID238 GO / AQUISIÇÃO DE EQUIPAMENTOS PARA LAB Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- IBRD / 82760 Post Open - National 99,925.00 0.00 Signed ORATÓRIO E AG. TRANSFU ublic Services tations e Envelope 11 05 04 SIONAL PARA HOSPITAL DA MULHER ID239 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- MOBILIÁRIO CORPORATIVO IBRD / 82760 Post Open - National 45,287.40 0.00 Signed ublic Services tations e Envelope 11 05 04 E HOSPITALAR PARA HOSPI TAL DA MULHER ID240 GO / AQUISIÇÃO DE Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- MATERIAIS HOSPITALAR E IBRD / 82760 Post Open - National 99,967.00 0.00 Signed ublic Services tations e Envelope 11 05 04 DIVERSOS PARA HOSPITAL DA MULHER ID241 GO / AQUISIÇÃO DE Under Impl Component 2: Improving P Request for Quo Single Stage - On 2022-07- 2022-09- 2022-12- EQUIPAMENTOS DE COZIN IBRD / 82760 Post Open - National 97,605.27 0.00 ementatio ublic Services tations e Envelope 11 05 04 HA PARA HOSPITAL DA MU n LHER ID137 1 GO-2 / AQUISIÇÃO DE MODELOS E SIMULADO Component 2: Improving P Request for Quo Single Stage - On 2022-09- 2022-10- 2022-12- IBRD / 82760 Post Open - National 100,000.00 0.00 Signed RES EDUCACIONAIS PARA ublic Services tations e Envelope 14 11 10 O HOSPITAL DA MULHER (R ELICITAÇÃO) ID256 GO / AQUISIÇÃO DE Under Impl Component 2: Improving P Request for Quo Single Stage - On 2022-09- 2022-10- 2022-12- EQUIPAMENTOS PARA "BLH IBRD / 82760 Post Open - National 64,000.00 0.00 ementatio ublic Services tations e Envelope 14 11 10 " DO HOSPITAL DA MULHE n R (RELICITAÇÃO) ID158 GO-1 / AQUISIÇÕES Component 2: Improving P Request for Bid Single Stage - On 2021-09- 2021-10- 2021-10- 2021-11- 2021-11- 2021-11- 2021-12- 2022-01- 2022-03- DE VIATURAS DUAS RODAS IBRD / 82760 Post Open - National 566,252.92 0.00 Canceled ublic Services s e Envelope 27 18 02 11 13 26 13 17 03 ESTILO “TRAIL” E DE ESCO LTA ID280 GO / IMPLANTAÇÃO Component 1: Sustainable 2022-12- 2023-03- 2023-01- 2023-02- 2023-05- DE SISTEMA DE ALERTA SO IBRD / 82760 Post Direct Selection Direct - National 550,000.00 0.00 Canceled Regional Development 21 21 05 15 16 NORO DA BARRAGEM DE L UCRÉCIA ID 180 GO - 1 / AQUISIÇÕE S E INSTALAÇÕES DE USIN Under Impl Component 3: Public Sect Request for Bid Single Stage - On 2023-02- 2023-03- 2023-02- 2023-03- 2023-04- 2023-04- 2023-06- 2023-09- AS FOTOVOLTAICAS CENTR IBRD / 82760 Post Open - National 905,000.00 0.00 ementatio or Management s e Envelope 20 16 25 27 19 26 05 03 O ADMINISTRATIVO E ÓRG n ÃOS DA ADMINISTRAÇÃO E STADUAL ID 301 GO / AQUISIÇÃO DE Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2023-03- 2023-04- 2023-07- PEÇAS DE BRINDES ECOLÓ IBRD / 82760 Post Open - National 28,846.00 0.00 plementati Regional Development tations e Envelope 15 11 10 GICOS PARA EVENTOS DO on TURISMO ID 302 GO / AQUISIÇÃO DE Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2023-03- 2023-04- 2023-06- PEÇAS DE ARTESANATO RE IBRD / 82760 Post Open - National 19,231.00 0.00 plementati Regional Development tations e Envelope 05 01 30 GIONAL PARA EVENTOS D on O TURISMO ID 303 GO / AQUISIÇÃO DE Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2023-03- 2023-04- 2023-07- PRODUTOS DA AGRICULTU IBRD / 82760 Post Open - National 19,231.00 0.00 plementati Regional Development tations e Envelope 17 13 12 RA FAMILIAR PARA EVENT on OS DO TURISMO ID 304 GO / AQUISIÇÃO DE MÁQUINA AGRÍCOLA – TIPO Under Impl TRATOR E CARRETA AGRÍC Component 3: Public Sect Request for Quo Single Stage - On 2023-03- 2023-04- 2023-06- IBRD / 82760 Post Open - National 61,923.00 0.00 ementatio OLA PARA SUPRIR AS NECE or Management tations e Envelope 05 01 30 n SSIDADES DOS SERVIÇOS DE MANUTENÇÃO E ESTRU TURAÇÃO DO CENTRO AD MINISTRATIVO ID 253 GO - 1 / MAQUINAS Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2023-03- 2023-05- 2023-08- E EQUIPAMENTOS PARA AG IBRD / 82760 Post Open - National 18,000.00 0.00 plementati Regional Development tations e Envelope 25 20 18 ROINDUSTRIAS DE CASA D on E FARINHA ID 305 GO / AQUISIÇÃO DE Component 3: Public Sect Request for Quo Single Stage - On 2023-03- 2023-05- 2023-07- EQUIPAMENTOS DE TI E TE IBRD / 82760 Post Open - National 42,308.00 0.00 Signed or Management tations e Envelope 31 26 25 CNLÓGICOS PARA ESTRUT URAÇÃO DA SIN ID 306 GO / AMBULÂNCIAS Pending Im Component 2: Improving P Request for Bid Single Stage - On 2023-03- 2023-04- 2023-05- 2023-05- 2023-06- 2023-09- TIPO FURGÃO PARA AS UNI IBRD / 82760 Post Open - National 1,807,692.00 0.00 plementati ublic Services s e Envelope 31 05 05 20 18 16 DADES DE SÁUDE on ID 310 GO / AQUISIÇÃO DE MATERIAIS LABORATORIAIS Pending Im PARA ANÁLISES DE POTABI Component 1: Sustainable Request for Quo Single Stage - On 2023-06- 2023-08- 2023-10- IBRD / 82760 Post Open - National 10,000.00 0.00 plementati LIDADE DE ÁGUA DOS SUB Regional Development tations e Envelope 09 04 03 on PROJETOS DE SISTEMAS SI MPLIFICADOS DE ABASTECI MENTO DE ÁGUA RURAIS 9/1/2015 / Equipamentos de TI para a SESED - 1 . Et Component 1: Sustainable Request for Quo Open - Internatio Terminate 2016-01- IBRD / 82760 Prior 2,388,786.69 2,445,055.13 apa - SESED - NCB - Relato Regional Development tations nal d 18 rio de Avaliacao - PE 09/20 15 NON CONSULTING SERVICES Activity Reference No. Specific Procureme Proposal Submissio Bid Evaluation Rep Loan / Credit Market Appro Procurement P Prequalificati Estimated A Actual Amou Process Draft Pre-qualificati Prequalification Eva Draft Bidding Docu Bidding Documents Contract Completio / Description Component Review Type Method nt Notice / Invitatio n / Opening / Minut ort and Recommen Signed Contract No. ach rocess on (Y/N) mount (US$) nt (US$) Status on Documents luation Report ment / Justification as Issued n n es dation for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID35 NC / LEVANTAMENTO Component 1: Sustainable 2017-07- 2017-08- 2017-09- 2018-09- TOPOGRAFICO A LASER DA IBRD / 82760 Prior E-Auctions Open 4,114,285.00 0.00 Canceled Regional Development 14 28 12 07 BACIA PIRANHAS/ACU ID76 NC / SERVICOS DE O RGANIZACAO DE EVENTOS Component 1: Sustainable Request for Quo Single Stage - On 2018-06- 2018-06- 2017-07- 2018-07- 2017-08- IBRD / 82760 Post Limited 18,942.19 12,942.15 Completed DA III FEIRA DE TALENTO N Regional Development tations e Envelope 02 29 26 29 22 A XXXIV NA FAMUSE, 2017 ID17 NC / COLETA DE DAD Pending Im OS DO PERFIL DE ENTRAD Component 3: Public Sect 2016-06- 2016-08- 2016-08- 2016-12- IBRD / 82760 Post E-Auctions Limited 181,818.00 0.00 plementati A DO ESTUDO DE AVALIAC or Management 17 01 21 19 on AO DE IMPACTO DOS SUBP ROJETOS PRODUTIVOS ID23 NC / SERVICOS DE F OTOGRAFIA PARA CAPTAC Component 1: Sustainable Request for Quo Single Stage - On 2016-08- 2016-09- 2017-10- 2016-10- 2019-10- IBRD / 82760 Post Limited 25,000.00 10,156.02 Completed AO DE IMAGENS TURISTICA Regional Development tations e Envelope 14 10 06 10 11 S DO RIO GRANDE DO NOR TE ID29 NC / PRESTACAO DE SERVICOS IMPLANTACAO Component 1: Sustainable 2016-05- 2016-07- 2017-11- 2016-08- 2017-12- 2016-12- 2021-11- DE AREA DE SUPORTE FOR IBRD / 82760 Post E-Auctions Limited 528,571.00 186,738.78 Signed Regional Development 31 30 20 19 09 17 09 RAGEIRO, INSTALACAO DE SISTEMA DE IRRIGACAO E PERFURACAO DE POCO TU BULAR ID40 NC / LOCACAO DE MI NI LOUNGE E SERVICOS DE Component 1: Sustainable 2017-01- 2017-01- 2017-01- 2016-12- 2017-02- 2017-02- 2017-03- 2017-03- IBRD / 82760 Post Direct Selection Direct 78,125.00 66,468.15 Completed MONTAGEM PARA CONVEN Regional Development 15 10 15 30 05 14 07 16 CAO DE VENDAS CVC 2017 , FOZ DO IGUACU-PR ID42 NC / LOCACAO DE ES Component 1: Sustainable 2017-02- 2017-02- 2017-02- 2017-02- 2017-03- 2017-04- 2017-04- 2017-06- TANDES E SERVICOS DE M IBRD / 82760 Post Direct Selection Direct 78,125.00 42,190.80 Completed Regional Development 20 17 20 01 13 01 12 02 ONTAGEM PARA WTM 2017 , SAO PAULO, SP ID43 NC / LOCACAO DE ES Component 1: Sustainable 2017-02- 2017-03- 2017-02- 2017-01- 2017-03- 2017-04- 2017-04- 2017-06- TANDES E SERVICOS DE M IBRD / 82760 Post Direct Selection Direct 23,437.50 17,378.77 Completed Regional Development 20 03 20 11 13 05 12 01 ONTAGEM PARA FEMPTUR, NATAL, RN - 2017 ID44 NC / LOCACAO E ORG ANIZACAO DE ESPACO PAR A PARTICIPACAO NO EVENT Component 1: Sustainable 2017-02- 2017-05- 2017-02- 2017-04- 2017-02- 2017-05- 2017-03- 2017-09- IBRD / 82760 Post Direct Selection Direct 31,250.00 26,714.04 Completed O EXPERIENCIA BRAZTOA, Regional Development 01 03 01 20 22 30 24 27 NAS REGIOES SUL, SUDEST E, NORDESTE E CENTRO O ESTE, 2017 ID46 NC / LOCACAO E ORG ANIZACAO DE ESPACO PAR Component 1: Sustainable 2017-08- 2017-03- 2017-08- 2017-03- 2017-08- 2017-05- 2017-09- 2017-07- IBRD / 82760 Post Direct Selection Direct 75,000.00 64,526.54 Completed A O EVENTO MEETING BRA Regional Development 01 07 01 07 22 24 21 18 SIL - MISSAO RN, 2017, AR GENTINA, CHILE E URUGUA I ID47 NC / LOCACAO E ORG ANIZACAO DE ESPACO PAR Component 1: Sustainable 2017-10- 2017-02- 2017-10- 2017-01- 2017-10- 2017-03- 2017-11- 2017-04- A PARTICIPACAO NO EVENT IBRD / 82760 Post Direct Selection Direct 21,774.19 18,148.09 Completed Regional Development 01 16 01 27 22 17 21 26 O 10° ENCONTRO COMERC IAL BRAZTOA, RIO DE JANEI RO, 2017 ID48 NC / LOCACAO DE ES PACO E SERVICOS DE MO Component 1: Sustainable 2017-03- 2017-03- 2017-03- 2017-04- IBRD / 82760 Post Direct Selection Direct 15,625.00 0.00 Canceled NTAGEM PARA DESTINATIO Regional Development 01 01 22 21 N BRAZIL 2017, SALVADOR -BAHIA ID49 NC / LOCACAO DE ES TANDES E SERVICOS DE M Component 1: Sustainable 2017-03- 2017-04- 2017-03- 2017-04- 2017-04- 2017-05- 2017-05- 2017-06- IBRD / 82760 Post Direct Selection Direct 14,062.50 12,098.73 Completed ONTAGEM PARA A BNT ME Regional Development 20 27 20 10 10 23 10 19 RCOSUL 2017, ITAJAI, SC. ID50 NC / MONTAGEM DE ESTANDES E SERVICOS DE Component 1: Sustainable 2017-05- 2017-04- 2017-05- 2017-01- 2017-05- 2017-06- 2017-06- 2017-07- ALIMENTACAO PARA 12 FE IBRD / 82760 Post Direct Selection Direct 26,562.50 22,853.15 Completed Regional Development 02 28 02 09 23 06 22 20 STIVAL DE TURISMO DAS C ATARATAS, 2017, FOZ DO I GUACU, PR Page 7 ID51 NC / MONTAGEM DE ESTANDES E SERVICOS DE Component 1: Sustainable 2017-06- 2017-06- 2017-06- 2016-11- 2017-06- 2017-07- 2017-07- 2017-09- IBRD / 82760 Post Direct Selection Direct 47,812.50 40,678.51 Completed ALIMENTACAO PARA AVIRR Regional Development 02 12 02 07 23 28 23 01 P,2017. RIBEIRAO PRETO, S P. ID52 NC / LOCACAO E MO Component 1: Sustainable 2017-07- 2017-08- 2017-07- 2017-08- 2017-07- 2017-09- 2017-08- 2017-11- NTAGEM DE ESTANDES PA IBRD / 82760 Post Direct Selection Direct 78,125.00 66,785.10 Completed Regional Development 02 14 02 03 23 25 22 08 RA ABAV, 2017. SAO PAUL O, SP. ID53 NC / LOCACAO DE ES TANDES E MONTAGEM DE Component 1: Sustainable 2017-08- 2017-05- 2017-08- 2017-05- 2017-09- 2017-07- 2017-10- 2017-10- IBRD / 82760 Post Direct Selection Direct 27,031.25 22,984.69 Completed EXPOSICAO PARA FEIRAO F Regional Development 20 30 20 08 10 27 10 30 LYTOUR, 2017, SANTOS/SP E CAMPINAS/SP ID54 NC / LOCACAO DE LO UNGE E MONTAGEM DE EX Component 1: Sustainable 2017-09- 2017-08- 2017-09- 2017-07- 2017-09- 2017-09- 2017-10- 2017-11- IBRD / 82760 Post Direct Selection Direct 8,125.00 6,945.65 Completed POSICAO PARA FESTIVAL D Regional Development 01 02 01 19 22 04 22 16 E TURISMO DE JOAO PESSO A, 2017 ID55 NC / LOCACAO DE ES TANDES E MONTAGEM DE Component 1: Sustainable 2017-05- 2017-09- 2017-05- 2017-09- 2017-05- 2017-10- 2017-06- 2017-12- IBRD / 82760 Post Direct Selection Direct 18,125.00 14,161.51 Completed EXPOSICAO PARA FESTIVAL Regional Development 02 22 02 11 23 23 22 08 DE TURISMO DE GRAMADO , 2017 ID56 NC / LOCACAO DE ES TANDES E MONTAGEM DE Component 1: Sustainable 2017-02- 2017-02- 2017-02- 2017-02- 2017-02- 2017-03- 2017-03- 2017-04- IBRD / 82760 Post Direct Selection Direct 46,875.00 39,656.93 Completed EXPOSICAO PARA PARTICIP Regional Development 02 06 02 06 23 14 25 19 ACAO NO EVENTO BTL - 20 17 ID57 NC / LOCACAO DE ES TANDES E MONTAGEM DE Component 1: Sustainable 2017-03- 2017-01- 2017-03- 2017-01- 2017-03- 2017-04- 2017-04- 2017-06- IBRD / 82760 Post Direct Selection Direct 8,000.00 7,279.20 Completed EXPOSICAO PARA O EVENT Regional Development 02 25 02 10 23 07 22 02 O “MUNDO ABREU” EM LIS BOA, PORTUGAL - - 2017 ID58 NC / LOCACAO DE ES TANDES E MONTAGEM DE Component 1: Sustainable 2017-07- 2017-06- 2017-07- 2017-06- 2017-07- 2017-08- 2017-08- 2017-09- EXPOSICAO PARA O EVENT IBRD / 82760 Post Direct Selection Direct 25,000.00 21,371.23 Completed Regional Development 02 27 02 27 23 08 22 19 O MEETING BRAZIL, REALIZ ADO EM BUENOS AIRES, C ORDOBA, BOGOTA E LIMA - 2017 ID60 NC / LOCACAO DE ES PACO E ORGANIZACAO PA Component 1: Sustainable 2017-09- 2017-08- 2017-09- 2017-07- 2017-09- 2017-10- 2017-10- 2017-12- IBRD / 82760 Post Direct Selection Direct 3,000.00 2,283.60 Completed RA PARTICIPACAO NO EVE Regional Development 02 18 02 28 23 10 23 29 NTO ROADSHOW SOLFERIA S, PORTUGAL - 2017 ID61 NC / LOCACAO DE ES PACO E ORGANIZACAO PA Component 1: Sustainable 2017-08- 2017-09- 2017-08- 2017-08- 2017-09- 2017-10- 2017-10- 2017-12- IBRD / 82760 Post Direct Selection Direct 35,000.00 35,000.00 Completed RA O EVENTO FIT AMERICA Regional Development 20 08 20 16 10 23 10 29 LATINA, BUENOS AIRES, AR GENTINA - 2017 ID62 NC / LOCACAO DE ES PACO E ORGANIZACAO PA Component 1: Sustainable 2017-09- 2017-10- 2017-09- 2017-09- 2017-09- 2017-11- 2017-10- 2017-12- IBRD / 82760 Post Direct Selection Direct 5,000.00 5,000.00 Completed RA O EVENTO DIA DO BRA Regional Development 02 20 02 25 23 10 23 29 SIL NA ARGENTINA - 2017 ID63 NC / LOCACAO E SER VICOS DE MONTAGEM DE L Component 1: Sustainable 2018-01- 2019-02- 2018-01- 2019-01- 2018-01- 2019-02- 2018-02- 2019-05- IBRD / 82760 Post Direct Selection Direct 78,125.00 45,544.96 Completed OUNGE PARA O EVENTO C Regional Development 05 07 05 21 26 08 25 23 ONVENCAO DE VENDAS CV C 2018 ID64 NC / LOCACAO E MO Component 1: Sustainable 2018-01- 2018-03- 2018-01- 2018-03- 2018-02- 2018-04- 2018-03- 2018-05- NTAGEM DE ESTANDES PA IBRD / 82760 Post Direct Selection Direct 25,000.00 13,059.66 Completed Regional Development 20 14 20 09 10 09 12 18 RA O EVENTO AVIESP 2018 , CAMPINAS, SP ID65 NC / LOCACAO E MO Component 1: Sustainable 2018-02- 2018-03- 2018-02- 2018-03- 2018-03- 2018-03- 2018-04- 2018-05- NTAGEM DE ESTANDES PA IBRD / 82760 Post Direct Selection Direct 78,125.00 39,522.50 Completed Regional Development 21 07 21 01 14 28 13 18 RA O EVENTO WTM - 2018 ID66 NC / LOCACAO E MO Component 1: Sustainable 2018-02- 2018-01- 2018-02- 2018-01- 2018-03- 2018-03- 2018-04- 2018-04- NTAGEM DE ESTANDES PA IBRD / 82760 Post Direct Selection Direct 23,437.50 16,028.42 Completed Regional Development 22 23 22 08 15 01 14 19 RA O EVENTO FEMPTUR, N ATAL, RN - 2018 ID68 NC / LOCACAO E MO Component 1: Sustainable 2018-02- 2018-02- 2018-03- 2018-04- NTAGEM DE ESTANDES PA IBRD / 82760 Post Direct Selection Direct 15,625.00 0.00 Canceled Regional Development 22 22 15 14 RA O EVENTO DESTINATIO N BRAZIL 2018 ID69 NC / LOCACAO E MO Component 1: Sustainable 2018-03- 2018-03- 2018-03- 2018-02- 2018-04- 2018-05- 2018-05- 2018-07- NTAGEM DE ESTANDES PA IBRD / 82760 Post Direct Selection Direct 14,062.50 15,885.73 Completed Regional Development 25 07 25 22 15 07 15 30 RA O EVENTO BNT MERCO SUL, ITAJAI, SC -2018 ID70 NC / SERVICOS DE L OCAÇÃO E MONTAGEM DE Component 1: Sustainable 2018-04- 2018-05- 2018-04- 2018-04- 2018-05- 2018-06- 2018-06- 2018-07- IBRD / 82760 Post Direct Selection Direct 26,562.50 14,011.92 Completed STANDS PARA O 12 FESTIV Regional Development 26 21 26 11 17 18 16 19 AL DE TURISMO DAS CATA RATAS - 2018 ID71 NC / LOCACAO DE ES TANDES E MONTAGEM DE Component 1: Sustainable 2018-01- 2018-01- 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-04- IBRD / 82760 Post Direct Selection Direct 46,875.00 39,491.41 Completed EXPOSICAO PARA PARTICIP Regional Development 27 18 27 11 17 21 19 09 ACAO NO EVENTO BTL - 20 18 ID72 NC / LOCACAO DE ES TANDES E MONTAGEM DE Component 1: Sustainable 2018-02- 2018-01- 2018-02- 2018-01- 2018-03- 2018-03- 2018-04- 2018-06- IBRD / 82760 Post Direct Selection Direct 8,000.00 8,108.52 Completed EXPOSICAO PARA O EVENT Regional Development 22 31 22 30 15 07 14 19 O “MUNDO ABREU” EM LIS BOA, PORTUGAL - 2018 ID73 NC / SERVICOS PARA Component 1: Sustainable Request for Quo Single Stage - On 2018-02- 2018-03- 2017-03- 2018-04- 2017-04- IBRD / 82760 Post Limited 10,937.50 7,660.47 Completed O DIA DO ARTESAO, 2017 Regional Development tations e Envelope 23 22 23 21 12 ID74 NC / SERVICOS DE O RGANIZACAO DE EVENTOS Component 1: Sustainable Request for Quo Single Stage - On 2018-05- 2018-06- 2018-07- IBRD / 82760 Post Limited 19,559.37 0.00 Canceled DA III FEIRA DE TALENTOS Regional Development tations e Envelope 11 07 07 DO VALE DO ASSU, 2017 ID75 NC / SERVICOS DE O RGANIZACAO DE EVENTOS Component 1: Sustainable Request for Quo Single Stage - On 2018-04- 2018-05- 2017-06- 2018-06- 2017-07- IBRD / 82760 Post Limited 20,515.62 34,547.72 Completed DA III FEIRA DE TALENTOS Regional Development tations e Envelope 13 10 14 09 25 DO OESTE POTIGUAR, 201 7 ID77 NC / LOCACAO DE ES Component 1: Sustainable 2018-01- 2017-12- 2018-01- 2017-10- 2018-01- 2018-01- 2018-02- 2018-02- TANDES E MONTAGEM DE IBRD / 82760 Post Direct Selection Direct 40,625.00 34,805.88 Completed Regional Development 03 07 03 31 24 18 23 20 EXPOSICAO PARA O EVENT O XXII FIART, 2017 ID78 NC / LOCACAO DE ES TANDES E MONTAGEM DE Component 1: Sustainable 2018-07- 2017-08- 2018-07- 2017-08- 2018-08- 2017-08- 2018-09- 2017-10- IBRD / 82760 Post Direct Selection Direct 25,000.00 21,455.07 Completed EXPOSICAO PARA O EVENT Regional Development 30 14 30 02 20 29 19 17 O PARA II BRASIL MOSTRA BRASIL, 2017 ID79 1 NC / MONTAGEM E PRODUCAO PARA EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-09- 2017-04- 2017-10- 2017-05- IBRD / 82760 Post Limited 35,000.00 29,559.05 Completed DA CAPRIFEIRA DO POTEN Regional Development tations e Envelope 23 19 19 19 02 GI, SAO PAULO DO POTEN GI, RN 2017 ID79 2 NC / MONTAGEM E PRODUCAO PARA EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2017-07- 2017-08- 2017-05- 2017-09- 2017-06- IBRD / 82760 Post Limited 27,000.00 16,391.40 Completed DA EXPOSICAO AGROPECU Regional Development tations e Envelope 23 19 26 18 28 ARIA DO SERIDO, RN 2017 ID79 4NC / MONTAGEM E Component 1: Sustainable Request for Quo Single Stage - On 2017-06- 2017-07- 2017-07- 2017-08- 2017-08- PRODUCAO PARA EVENTO IBRD / 82760 Post Limited 25,000.00 12,993.43 Completed Regional Development tations e Envelope 11 08 07 07 02 DA EXPONOVOS, RN 2017 ID79 5NC / MONTAGEM E Component 1: Sustainable Request for Quo Single Stage - On 2017-02- 2017-03- 2017-04- PRODUCAO PARA EVENTO IBRD / 82760 Post Limited 10,000.00 0.00 Canceled Regional Development tations e Envelope 21 20 19 DA CAPRIFEIRA DE AFONS O BEZERRA, RN 2017 ID14 NC / ADEQUACAO DA Component 3: Public Sect Request for Quo Single Stage - On 2017-06- 2017-08- 2018-02- INFRAESTRUTURA ELETRIC IBRD / 82760 Post Limited 306,748.00 0.00 Canceled or Management tations e Envelope 20 15 11 A E DE REDE DE DADOS D A CONTROL E SEPLAN 335454/2016-1 / LEVANTA Component 3: Public Sect 2017-06- 2017-06- 2017-06- 2017-07- 2017-09- 2018-01- MENTO E REGISTRO DO PA IBRD / 82760 Prior E-Auctions Open 4,144,237.00 2,557,997.34 Signed or Management 01 20 15 25 01 21 TRIMÔNIO IMÓVEL DO EST ADO 20309/2017-1 / DIGITALIZ AÇÃO DO ACERVO DE IDEN Component 2: Improving P 2017-07- 2017-07- 2017-12- 2017-08- 2017-12- 2018-03- IBRD / 82760 Prior E-Auctions Open 2,350,000.00 1,881,409.32 Signed TIFICAÇÃO DO INSTITUTO T ublic Services 07 26 07 30 27 28 ÉCNICO CIENTIFICO - ITEP ETAPA 2 ID 81 NC / SERVIÇOS PARA MONTAGEM E PRODUÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-08- 2017-09- 2017-09- 2017-11- 2017-11- IBRD / 82760 Post Limited 62,500.00 37,433.59 Completed DE EVENTOS PARA REALIZ Regional Development tations e Envelope 05 31 24 19 23 08 AÇÃO DO FEST BOSSA & JA ZZ EM MOSSORÓ E PIPA ID 83 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable 2017-06- 2017-06- 2017-07- 2017-07- 2017-08- 2017-07- 2017-09- IBRD / 82760 Post Direct Selection Direct 15,625.00 12,835.34 Signed EXPOSIÇÃO PARA O EVENT Regional Development 21 26 11 26 30 28 29 O DO FESTIVAL DE SERRA DE SÃO BENTO, 2017 ID80 NC / LOCACAO DE ES TANDES PARA XXXVII CON Component 1: Sustainable 2017-04- 2017-04- 2017-05- 2017-11- IBRD / 82760 Post Direct Selection Direct 12,500.00 0.00 Canceled GRESSO BRASILEIRO DE G Regional Development 15 15 06 02 UIA DE TURISMO, NATAL, R N, 2017 ID 85 NC / SERVIÇOS PARA IMPRESSÃO DE MATERIAIS Component 1: Sustainable 2017-07- 2017-07- 2018-01- 2017-09- 2018-03- 2018-03- IBRD / 82760 Post E-Auctions Open 250,000.00 102,595.00 Signed COM INFORMAÇÕES TURÍS Regional Development 07 26 18 08 13 07 TICAS PARA DIVULGAÇÃO DO ESTADO ID41 1 NC / LOCACAO DE Component 1: Sustainable 2017-07- 2017-08- 2017-07- 2017-05- 2017-08- 2017-10- 2017-09- 2017-11- ESTANDE PARA ADVENTUR IBRD / 82760 Post Direct Selection Direct 12,500.00 9,546.11 Completed Regional Development 19 22 24 24 28 10 27 23 E TURISMO - SAO PAULO - 2017 ID67 1 NC / LOCACAO DE Component 1: Sustainable Request for Quo Single Stage - On 2017-07- 2017-09- 2017-10- ESTANDE PARA FEIRA DE T IBRD / 82760 Post Limited 15,625.00 0.00 Canceled Regional Development tations e Envelope 24 18 18 URISMO MOSSORO, 2017 ID 67 2 NC / LOCACAO DE ESTANDE PARA O FESTIVAL Component 1: Sustainable Request for Quo Single Stage - On 2017-07- 2018-08- 2017-09- 2017-08- 2017-10- 2017-09- IBRD / 82760 Post Limited 15,625.00 13,828.47 Completed DO CAMARA E DA OSTRA E Regional Development tations e Envelope 24 15 18 10 18 11 M TIBAL DO SUL - 2017 ID41 NC / LOCACAO DE ES TANDES PARA XXXVII CON Component 1: Sustainable 2017-04- 2017-04- 2017-05- 2017-06- IBRD / 82760 Post Direct Selection Direct 12,500.00 0.00 Canceled GRESSO BRASILEIRO DE G Regional Development 15 15 06 05 UIA DE TURISMO, NATAL, R N, 2017 ID67 NC / LOCACAO E MO NTAGEM DE ESTANDES PA Component 1: Sustainable 2018-01- 2018-01- 2018-02- 2018-03- IBRD / 82760 Post Direct Selection Direct 31,250.00 0.00 Canceled RA O EVENTO EVENTO VIS Regional Development 23 23 13 15 UAL TURISMO, BAHIA - 201 8 ID86 NC / CONTRATAÇÃO DE OPERADORA DE TURIS Component 1: Sustainable 2017-07- 2017-08- 2017-09- 2018-03- MO PARA DIVULGAÇÃO DO IBRD / 82760 Post Direct Selection Direct 95,000.00 0.00 Canceled Regional Development 31 07 11 10 DESTINO RIO GRANDE DO NORTE NO MERCADO TURÍ STICO DA ARGENTINA, 201 7 ID87 NC / SERVIÇOS PARA VEICULAR CAMPANHA DE D Component 1: Sustainable 2017-07- 2017-08- 2017-08- 2017-05- 2017-09- 2017-10- 2018-03- 2018-04- IBRD / 82760 Post Direct Selection Direct 87,500.00 74,913.38 Completed IVULGAÇÃO TURÍSTICA EM Regional Development 31 15 05 30 09 25 08 23 REVISTA DE TURISMO DE C IRCULAÇÃO NACIONAL, 20 17 ID79 3 NC / MONTAGEM E Component 1: Sustainable Request for Quo Single Stage - On 2017-05- 2017-06- 2017-09- 2017-07- 2017-09- PRODUÇÃO PARA EVENTO IBRD / 82760 Post Limited 16,000.00 9,113.20 Completed Regional Development tations e Envelope 25 27 02 27 30 DA 23ª EXPOLAJES EM LAJE S - RN, 2017 ID 84 NC / SERVIÇOS PARA PRODUÇÃO DE VÍDEO INST Component 1: Sustainable 2017-08- 2017-09- 2017-08- 2017-10- 2017-10- 2018-04- 2018-08- ITUCIONAL TURÍSTICO EST IBRD / 82760 Post E-Auctions Open 100,000.00 40,531.54 Completed Regional Development 23 11 25 16 10 14 16 ADO DO RIO GRANDE DO N ORTE, PARA DIVULGAÇÃO DO DESTINO ID26 NC / ALFABETIZADOR ES E TECNICOS PARA ALFA Component 2: Improving P 2017-08- 2017-09- 2018-02- 2017-10- 2018-03- 2018-04- 2022-01- IBRD / 82760 Post E-Auctions Open 1,400,000.00 609,648.89 Completed BETIZACAO C/ QUALIFICAC ublic Services 24 12 20 17 09 15 17 AO SOCIAL E PROFISSIONA L ID 88 NC / SERVIÇOS PARA MONTAGEM E PRODUÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2018-08- 2017-10- 2017-09- 2018-04- 2017-11- IBRD / 82760 Post Limited 15,625.00 9,765.48 Completed DE EVENTOS PARA REALIZ Regional Development tations e Envelope 29 17 24 20 22 08 AÇÃO DO FESTIVAL GASTR ONÔMICO DE PIPA ID 89 NC / SERVIÇOS PARA MONTAGEM E PRODUÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-12- 2017-10- 2018-01- 2018-04- 2018-02- IBRD / 82760 Post Limited 15,625.00 13,700.43 Completed DE EVENTOS PARA REALIZ Regional Development tations e Envelope 29 18 24 12 22 26 AÇÃO DO FESTIVAL GASTR ONÔMICO DE BAÍA FORMO SA ID 90 NC / AQUISIÇÃO DE Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-10- 2018-04- 2018-04- 2018-10- BRINDES PARA DIVULGAÇà IBRD / 82760 Post Limited 62,500.00 79,401.77 Completed Regional Development tations e Envelope 29 24 12 22 12 O TURÍSTICAS DO RN ID 91 NC / AQUISIÇÃO DE Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-11- 2017-10- 2017-12- 2018-04- 2019-06- PRODUTOS AGRÍCOLAS PA IBRD / 82760 Post Limited 25,000.00 14,297.08 Completed Regional Development tations e Envelope 29 25 24 01 22 12 RA DIVULGAÇÃO TURÍSTIC AS DO RN ID 92 NC / AQUISIÇÃO DE Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-11- 2017-10- 2017-12- 2018-04- 2018-12- ARTESANATO PARA DIVUL IBRD / 82760 Post Limited 25,000.00 31,049.17 Completed Regional Development tations e Envelope 29 24 24 30 22 21 GAÇÃO TURÍSTICAS DO RN ID 93 NC / SERVIÇOS PARA MONTAGEM E PRODUÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-12- 2017-10- 2018-02- 2018-04- 2018-05- IBRD / 82760 Post Limited 93,750.00 80,767.15 Completed DE EVENTOS PARA REALIZ Regional Development tations e Envelope 29 06 24 22 22 23 AÇÃO DO FESTIVAL DE CIN EMA DO RN ID 94 NC / SERVIÇOS PARA PRODUÇÃO E VEICULAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-09- 2017-10- 2017-10- 2018-04- 2017-12- IBRD / 82760 Post Limited 93,750.00 57,777.55 Completed DE CAMPANHA DE EVENTO Regional Development tations e Envelope 29 20 24 11 22 28 CULTURAL (MÁRTIRES) ID 95 NC / SERVIÇOS PARA Component 1: Sustainable Request for Quo Single Stage - On 2017-08- 2017-09- 2017-10- 2017-10- 2018-04- 2017-12- CRIAÇÃO, PRODUÇÃO E AP IBRD / 82760 Post Limited 93,750.00 49,310.92 Completed Regional Development tations e Envelope 29 28 24 17 22 02 RESENTAÇÃO TEATRAL (M ÁRTIRES) ID19 NC / SERVICOS PARA Component 2: Improving P 2017-05- 2017-07- 2017-07- 2018-03- 3 EDICAO DO SIMAIS COM IBRD / 82760 Post E-Auctions Open 1,363,636.00 0.00 Canceled ublic Services 29 13 28 25 AVALIACAO INSTITUCIONAL ID8 NC / SERVIÇOS PARA 2 Component 2: Improving P 2017-09- 2017-09- 2017-10- 2018-04- ª E 3ª EDIÇÕES DO SIMAIS IBRD / 82760 Prior E-Auctions Open 2,727,272.00 0.00 Canceled ublic Services 01 20 25 23 COM AVALIAÇÃO INSTITUCI ONAL ID79 6 NC / LOCACAO DE ESTANDES E MONTAGEM D Component 1: Sustainable Request for Quo Single Stage - On 2017-07- 2017-07- 2017-10- 2017-08- 2017-12- IBRD / 82760 Post Limited 100,362.00 52,943.99 Completed E EXPOSICAO PARA O EVE Regional Development tations e Envelope 03 30 07 29 08 NTO DA FESTA DO BOI, 20 17 ID 96 NC / MONTAGEM E P Component 1: Sustainable Request for Quo Single Stage - On 2017-09- 2018-08- 2017-11- 2017-09- 2018-04- 2017-10- RODUÇÃO PARA EVENTO D IBRD / 82760 Post Limited 25,022.00 14,886.56 Completed Regional Development tations e Envelope 06 16 01 29 30 28 A 1ª EXPOESTE EM CARAÚ BAS - RN, 2017 ID97 NC / SERVIÇOS PARA ORGANIZAÇÃO E MONTAG Component 1: Sustainable Request for Quo Single Stage - On 2017-09- 2017-11- 2017-10- 2018-05- 2017-12- IBRD / 82760 Post Open - National 76,165.37 48,769.02 Completed EM DE EVENTO CULTURA E Regional Development tations e Envelope 16 11 10 10 20 M SÃO GONÇALO DO AMAR ANTE -RN, 2017 ID100 NC / SERVIÇOS DE B UFFET COM O OBJETIVO DE Component 1: Sustainable Request for Quo Single Stage - On 2017-10- 2017-11- 2017-12- 2018-05- APOIAR AS AÇÕES DE FOR IBRD / 82760 Post Open - National 81,493.75 58,003.63 Signed Regional Development tations e Envelope 05 30 28 29 MAÇÃO E CAPACITAÇÃO D O PROJETO NO TERRITÓRIO TERRA DOS POTIGUARAS ID101 NC / SERVIÇOS PAR Component 1: Sustainable Request for Quo Single Stage - On 2017-10- 2018-08- 2017-12- 2017-11- 2018-06- 2017-12- A ORGANIZAÇÃO E MONTA IBRD / 82760 Post Limited 46,875.00 27,779.04 Completed Regional Development tations e Envelope 24 16 19 15 17 21 GEM DE EVENTO DA FENAC AN -RN, 2017 ID102 NC / LOCAÇÃO DE E Component 1: Sustainable 2017-12- 2017-12- 2017-12- 2017-10- 2018-01- 2018-01- 2018-07- 2018-02- STANDES E MONTAGEM DE IBRD / 82760 Post Direct Selection Direct 40,625.00 40,223.94 Completed Regional Development 18 07 23 31 27 19 26 20 EXPOSIÇÃO PARA O EVENT O XXIII FIART, 2018 ID103 NC / LOCAÇÃO E OR GANIZAÇÃO DE ESPAÇO PA Component 1: Sustainable 2017-12- 2018-02- 2017-12- 2018-02- 2018-01- 2018-03- 2018-07- 2018-09- RA PARTICIPAÇÃO NO EVE IBRD / 82760 Post Direct Selection Direct 31,250.00 14,456.21 Completed Regional Development 20 26 25 19 29 19 28 26 NTO 11° ENCONTRO COME RCIAL BRAZTOA, RIO DE JA NEIRO, 2018 ID106 NC / LOCAÇÃO E OR Component 1: Sustainable 2017-12- 2018-05- 2017-12- 2018-04- 2018-01- 2018-05- 2018-07- 2018-08- GANIZAÇÃO DE ESPAÇO PA IBRD / 82760 Post Direct Selection Direct 62,500.00 53,703.53 Completed Regional Development 20 03 25 17 29 22 28 09 RA EVENTO MOSTRA VIAJA R, 2018, SÃO PAULO ID107 NC / MONTAGEM DE ESTANDES E SERVIÇOS DE Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-07- 2018-08- IBRD / 82760 Post Limited 50,000.00 16,105.65 Signed ALIMENTAÇÃO PARA AVIRR Regional Development tations e Envelope 25 19 27 18 P, 2018. RIBEIRÃO PRETO, SP ID108 NC / LOCAÇÃO DE E Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-09- 2018-08- STANDE PARA FEIRA DE TU IBRD / 82760 Post Limited 15,625.00 13,421.38 Signed Regional Development tations e Envelope 25 19 13 18 RISMO MOSSORÓ, 2018 Page 8 ID109 NC / LOCAÇÃO E M Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-09- 2018-08- ONTAGEM DE ESTANDES P IBRD / 82760 Post Limited 78,125.00 52,603.92 Signed Regional Development tations e Envelope 25 19 21 18 ARA EXPO ABAV, 2018. Sà O PAULO, SP. ID110 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-08- 2018-08- IBRD / 82760 Post Limited 29,687.50 24,365.97 Signed EXPOSIÇÃO PARA FEIRÃO F Regional Development tations e Envelope 25 19 22 18 LYTOUR, 2018, SANTOS/SP E CAMPINAS/SP ID111 NC / LOCAÇÃO E M ONTAGEM DE EXPOSIÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-08- 2018-08- IBRD / 82760 Post Limited 9,375.00 7,677.03 Signed PARA FESTIVAL DE TURISM Regional Development tations e Envelope 25 19 22 18 O DE JOÃO PESSOA, 2018 ID112 NC / LOCAÇÃO DE E Component 1: Sustainable 2017-12- 2018-07- 2017-12- 2018-05- 2018-01- 2018-09- 2018-07- 2018-11- STANDE PARA ADVENTURE IBRD / 82760 Post Direct Selection Direct 14,062.50 12,104.42 Completed Regional Development 20 16 25 18 29 24 28 08 TURISMO - SÃO PAULO - 20 18 ID113 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-09- 2018-08- IBRD / 82760 Post Limited 17,187.50 13,891.30 Signed EXPOSIÇÃO PARA FESTIVAL Regional Development tations e Envelope 25 19 28 18 DE TURISMO DE GRAMADO , 2018 ID115 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-07- 2018-08- EXPOSIÇÃO PARA O EVENT IBRD / 82760 Post Limited 28,125.00 24,118.02 Signed Regional Development tations e Envelope 25 19 11 18 O MEETING BRAZIL, REALIZ ADO EM MONTIVIDEO, SAN TIAGO, BOGOTA E LIMA - 2 018 ID116 NC / LOCAÇÃO DE E SPAÇO E ORGANIZAÇÃO PA Component 1: Sustainable 2017-12- 2018-07- 2017-12- 2018-06- 2018-01- 2018-09- 2018-07- 2018-11- IBRD / 82760 Post Direct Selection Direct 46,875.00 40,000.00 Completed RA O EVENTO FIT AMERICA Regional Development 20 16 25 14 29 21 28 29 LATINA, BUENOS AIRES, AR GENTINA - 2018 ID120 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-08- 2018-02- 2018-07- 2018-08- 2018-08- IBRD / 82760 Post Limited 15,625.00 12,012.36 Completed EXPOSIÇÃO PARA O EVENT Regional Development tations e Envelope 25 15 19 30 18 30 O DO FESTIVAL DE SERRA DE SÃO BENTO, 2018 ID122 NC / LOCAÇÃO DE E STANDE PARA O FESTIVAL Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-06- 2018-02- 2018-05- 2018-08- 2018-07- IBRD / 82760 Post Limited 15,625.00 13,398.83 Completed DO CAMARÃO E DA OSTRA Regional Development tations e Envelope 25 01 19 22 18 11 EM TIBAU DO SUL - 2018 ID123 NC / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-09- 2018-02- 2018-09- 2018-08- 2018-10- IBRD / 82760 Post Limited 15,625.00 12,244.40 Completed O DE EVENTOS PARA REALI Regional Development tations e Envelope 25 06 19 17 18 18 ZAÇÃO DO FESTIVAL GAST RONÔMICO DE PIPA, 2018 ID124 NC / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-05- 2018-02- 2018-08- 2018-08- 2018-10- IBRD / 82760 Post Limited 62,500.00 53,626.85 Completed O DE EVENTOS PARA REALI Regional Development tations e Envelope 25 11 19 18 18 11 ZAÇÃO DO FEST BOSSA & J AZZ EM MOSSORÓ, 2018 ID126 NC / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-10- 2018-02- 2018-11- 2018-08- 2018-12- O DE EVENTOS PARA REALI IBRD / 82760 Post Limited 23,437.50 19,965.59 Completed Regional Development tations e Envelope 25 30 19 22 18 17 ZAÇÃO DO FESTIVAL DE CI NEMA EM SÃO MIGUEL DO GOSTOSO/RN, 2018 ID127 NC / SERVIÇOS PAR Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-03- 2018-02- 2018-03- 2018-08- 2018-05- IBRD / 82760 Post Limited 14,297.00 6,833.44 Completed A O DIA DO ARTESÃO, 201 Regional Development tations e Envelope 26 22 20 23 19 23 8 ID128 NC / SERVIÇOS DE ORGANIZAÇÃO DE EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2020-03- 2018-02- 2018-08- IBRD / 82760 Post Limited 22,368.00 0.00 Canceled S DA I FEIRA DE TALENTOS Regional Development tations e Envelope 26 03 20 19 DA CHAPADA DO APODI, 2 018 ID129 NC / SERVIÇOS DE ORGANIZAÇÃO DE EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-08- IBRD / 82760 Post Limited 53,494.00 0.00 Canceled S DA II FEIRA DE TALENTOS Regional Development tations e Envelope 26 20 19 DO OESTE EM MOSSORÓ, 2 018 ID130 NC / SERVIÇOS DE ORGANIZAÇÃO DE EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-07- 2018-02- 2018-07- 2018-08- 2018-11- IBRD / 82760 Post Limited 20,918.75 14,944.55 Completed S DA IV FEIRA DE TALENTO Regional Development tations e Envelope 26 20 20 24 19 20 NA XXXIV NA FAMUSE, 201 8 ID131 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable 2017-12- 2018-08- 2017-12- 2018-08- 2018-01- 2018-08- 2018-07- 2018-10- IBRD / 82760 Post Direct Selection Direct 24,937.50 21,535.68 Completed EXPOSIÇÃO PARA O EVENT Regional Development 21 28 26 21 30 29 29 01 O PARA III BRASIL MOSTRA BRASIL, 2018 ID132 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-08- IBRD / 82760 Post Limited 10,000.00 0.00 Canceled EXPOSIÇÃO PARA O EVENT Regional Development tations e Envelope 26 20 19 O DA FESTA DO BOI, 2018 ID133 NC / SERVIÇOS EVE Component 1: Sustainable Request for Quo Single Stage - On 2018-02- 2018-08- 2018-04- 2018-10- NTUAIS DE BUFFET, CONFO IBRD / 82760 Post Limited 13,359.37 0.00 Canceled Regional Development tations e Envelope 26 20 23 20 RME DEMANDA, PARA O TE RRITÓRIO TRAIRI ID134 NC / SERVIÇOS EVE NTUAIS DE BUFFET, CONFO Component 1: Sustainable Request for Quo Single Stage - On 2018-02- 2018-06- 2018-04- 2018-07- 2018-10- IBRD / 82760 Post Limited 11,500.00 17,172.94 Signed RME DEMANDA, PARA O TE Regional Development tations e Envelope 26 08 23 31 20 RRITÓRIO AGRESTE LITORA L ID135 NC / SERVIÇOS EVE NTUAIS DE BUFFET, CONFO Component 2: Improving P Request for Quo Single Stage - On 2018-02- 2018-08- 2018-04- 2018-10- IBRD / 82760 Post Limited 10,781.25 0.00 Canceled RME DEMANDA, PARA O TE ublic Services tations e Envelope 26 20 23 20 RRITÓRIO SERTÃO CENTRA L ID67 3 NC / LOCAÇÃO E O Component 1: Sustainable Request for Quo Single Stage - On 2018-02- 2018-04- 2018-05- 2018-10- RGANIZAÇÃO DE ESPAÇO IBRD / 82760 Post Limited 46,250.00 40,258.96 Signed Regional Development tations e Envelope 27 24 14 21 NO EVENTO FRT, NATAL 20 18 ID114 NC / LOCAÇÃO E OR GANIZAÇÃO DE ESPAÇO PA Component 1: Sustainable 2017-12- 2018-03- 2017-12- 2018-02- 2018-01- 2018-04- 2018-07- 2018-06- RA O EVENTO MEETING BR IBRD / 82760 Post Direct Selection Direct 78,125.00 65,924.41 Completed Regional Development 20 13 25 07 29 13 28 14 ASIL - MISSÃO RN, 2018, A RGENTINA, PARAGUAI E UR UGUAI PARA O 1º SEMESTR E ID114 1 NC / LOCAÇÃO E ORGANIZAÇÃO DE ESPAÇO Component 1: Sustainable 2018-03- 2018-07- 2018-03- 2018-05- 2018-04- 2019-03- 2018-10- 2019-04- PARA O EVENTO MEETING IBRD / 82760 Post Direct Selection Direct 78,125.00 44,418.12 Completed Regional Development 19 10 24 09 28 19 25 27 BRASIL - MISSÃO RN, 2018, ARGENTINA, PARAGUAI E U RUGUAI NO 2º SEMESTRE ID29 1 NC / PRESTAÇÃO D Component 1: Sustainable Request for Bid Single Stage - On 2018-03- 2018-03- 2018-05- 2018-06- 2018-07- 2019-01- E SERVIÇOS DE PLANTAÇà IBRD / 82760 Post Limited 548,430.00 0.00 Canceled Regional Development s e Envelope 20 25 06 05 10 06 O DE ÁREA COM MUDAS D E CAJU. ID150 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable Request for Quo Single Stage - On 2018-04- 2018-06- 2018-04- 2018-12- 2018-05- IBRD / 82760 Post Open - National 77,843.75 45,217.89 Completed EXPOSIÇÃO PARA O EVENT Regional Development tations e Envelope 09 04 13 01 07 O CAPRIFEIRA DE SÃO PAU LO DO POTENGI, 2018 ID151 NC / CONTRATAÇÃO DE PRESTAÇÃO DE SERVIÇ Component 1: Sustainable Request for Pro Single Stage - On 2018-04- 2018-05- 2018-04- 2018-05- 2018-05- 2018-06- 2018-07- 2019-01- IBRD / 82760 Post Open - National 4,671.88 0.00 Canceled OS DE RESTAURAÇÃO DE Regional Development posals e Envelope 04 10 09 21 14 20 25 21 MÓVEIS DO MUSEU CAFÉ FI LHO ID152 NC / CONTRATAÇÃO DE EMPRESA ESPECIALIZA Component 1: Sustainable 2018-04- 2018-04- 2018-04- 2018-06- 2018-11- DA EM PRESTAÇÃO DE SER IBRD / 82760 Post E-Auctions Open 26,928.70 0.00 Canceled Regional Development 04 09 28 02 29 VIÇO DE SONORIZAÇÃO DE AMBIENTES PARA O MUSEU CAFÉ FILHO ID137 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable 2018-04- 2018-06- 2018-04- 2018-04- 2018-06- 2018-06- 2018-06- 2018-11- IBRD / 82760 Post E-Auctions Open 23,437.50 21,814.20 Signed EXPOSIÇÃO PARA O EVENT Regional Development 05 07 10 29 07 03 07 30 O AGROPECUÁRIA DO SERI DÓ EM CAICÓ, 2018 ID151NC / LOCAÇÃO DE E Under Impl STANDES E MONTAGEM DE Component 1: Sustainable 2018-04- 2018-04- 2018-04- 2018-05- 2018-06- 2018-11- IBRD / 82760 Post E-Auctions Open 23,437.50 0.00 ementatio EXPOSIÇÃO PARA O EVENT Regional Development 05 10 29 15 03 30 n O AGROPECUÁRIA DE CUR RAIS NOVOS, 2018 ID153 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable 2018-04- 2018-04- 2018-04- 2018-06- 2018-11- IBRD / 82760 Post E-Auctions Open 23,437.50 0.00 Canceled EXPOSIÇÃO PARA O EVENT Regional Development 05 10 29 03 30 O AGROPECUÁRIA DE LAJE S, 2018 ID155 NC / SERVIÇOS PAR Component 1: Sustainable 2018-04- 2018-04- 2018-05- 2018-11- A VEICULAR CAMPANHA DE IBRD / 82760 Prior Direct Selection Direct 200,000.00 0.00 Canceled Regional Development 12 17 22 18 DIVULGAÇÃO TURÍSTICA N A HOLANDA, 2018 ID156 NC / AQUISICAO DE Component 1: Sustainable Terminate 2018-05- 2018-05- 2018-05- 2018-05- 2018-08- 2018-07- 2018-07- 2019-01- PAINÉIS EXPOSITIVO PARA IBRD / 82760 Post E-Auctions Open 28,652.00 26,604.25 Regional Development d 07 30 12 31 24 05 17 01 O MUSEU CAFÉ FILHO ID152 NC2 / CONTRATAÇà O DE EMPRESA ESPECIALIZ Component 1: Sustainable Request for Quo Single Stage - On 2018-06- 2018-08- 2019-02- ADA EM PRESTAÇÃO DE SE IBRD / 82760 Post Open - National 26,928.70 0.00 Canceled Regional Development tations e Envelope 26 21 17 RVIÇO DE SONORIZAÇÃO D E AMBIENTES PARA O MUS EU CAFÉ FILHO ID176NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2018-09- 2018-11- 2019-05- OCAÇÃO E MONTAGEM PA IBRD / 82760 Post Limited 62,500.00 0.00 Canceled Regional Development tations e Envelope 15 10 09 RA FESTA DO BOI 2018 ID194NC / SERVIÇOS DE D Component 1: Sustainable Request for Quo Single Stage - On 2018-10- 2018-12- 2019-01- IVULGAÇÃO DO CORREDO IBRD / 82760 Post Limited 56,250.00 0.00 Canceled Regional Development tations e Envelope 13 08 07 R CULTURAL DA SEGUNDA GUERRA MUNDIAL ID189NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2019-04- 2019-04- 2019-06- 2019-04- 2019-12- 2019-05- OCAÇÃO E MONTAGEM DA IBRD / 82760 Post Limited 25,000.00 19,453.13 Completed Regional Development tations e Envelope 16 04 11 10 08 17 CAPRIFEIRA DE SÃO PAULO DO POTENGI (2019) ID188NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2019-08- 2020-03- 2019-10- 2019-10- 2019-11- 2019-11- OCAÇÃO E MONTAGEM DA IBRD / 82760 Post Limited 62,500.00 40,903.91 Completed Regional Development tations e Envelope 27 03 22 10 21 02 FESTA DO BOI (2019) ID187NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2019-02- 2019-10- 2019-04- 2019-11- 2019-05- 2019-11- OCAÇÃO E MONTAGEM DA IBRD / 82760 Post Limited 62,500.00 44,565.91 Completed Regional Development tations e Envelope 19 31 16 11 16 28 FENACAM (2019) ID186NC / SERVIÇOS DE L OCAÇÃO E MONTAGEM DA Component 1: Sustainable Request for Quo Single Stage - On 2019-03- 2019-04- 2019-05- 2019-05- 2019-06- 2019-08- IBRD / 82760 Post Limited 25,000.00 19,672.87 Completed EXPOSIÇÃO AGROPECUÁRI Regional Development tations e Envelope 25 24 20 02 19 01 A DE CURRAIS NOVOS (201 9) ID185NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2019-04- 2020-03- 2019-06- 2019-08- 2019-07- 2019-10- OCAÇÃO E MONTAGEM DA IBRD / 82760 Post Limited 25,000.00 8,873.69 Completed Regional Development tations e Envelope 15 03 10 29 10 18 EXPOSIÇÃO AGROPECUÁRI A DE LAJES (2019) ID184NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2019-03- 2019-05- 2019-05- 2019-05- 2019-06- 2019-06- OCAÇÃO E MONTAGEM DA IBRD / 82760 Post Limited 25,000.00 13,363.40 Completed Regional Development tations e Envelope 18 16 13 28 12 17 FESTA AGROPECUÁRIA DE CAICÓ (2019) ID182NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2019-06- 2019-08- 2020-02- OCAÇÃO E MONTAGEM DA IBRD / 82760 Post Limited 25,000.00 0.00 Canceled Regional Development tations e Envelope 30 25 21 FEIRA DO TALENTO DE CAI CÓ (2019) ID180NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2019-08- 2019-10- 2020-04- OCAÇÃO E MONTAGEM DA IBRD / 82760 Post Limited 25,000.00 0.00 Canceled Regional Development tations e Envelope 13 08 05 FEIRA DO ARTESANATO DE CARAÚBAS (2019) ID181NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2019-02- 2020-03- 2019-04- 2019-08- 2019-10- 2019-09- OCAÇÃO E MONTAGEM DA IBRD / 82760 Post Limited 25,000.00 12,244.35 Completed Regional Development tations e Envelope 25 03 22 15 19 06 FEIRA DO BODE MOSSORÓ (2019) ID197NC / CONFECÇÃO E I MPRESSÃO DE MATERIAL G Component 2: Improving P Request for Quo Single Stage - On 2018-08- 2018-10- 2018-12- 2018-12- 2019-02- IBRD / 82760 Post Limited 1,500.00 864.00 Completed RÁFICO PARA AÇÃO DE SAL ublic Services tations e Envelope 15 10 14 09 14 VAGUARDAS DAS OBRAS D AS ESCOLAS ID137NC2 / LOCACAO DE ESTANDES E MONTAGEM D Component 1: Sustainable Request for Quo Single Stage - On 2018-04- 2018-06- 2018-06- 2018-06- 2018-08- 2018-07- IBRD / 82760 Post Limited 23,437.50 15,244.60 Completed E EXPOSICAO PARA O EVE Regional Development tations e Envelope 10 06 05 07 04 06 NTO AGROPECUARIA DO S ERIDO EM CAICO, 2018 ID151 NC2 / LOCACAO DE ESTANDES E MONTAGEM D Component 1: Sustainable Request for Quo Single Stage - On 2018-04- 2018-05- 2018-06- 2018-05- 2018-12- 2018-07- IBRD / 82760 Post Limited 23,437.50 15,412.32 Completed E EXPOSICAO PARA O EVE Regional Development tations e Envelope 10 11 05 16 02 12 NTO AGROPECUARIA DE C URRAIS NOVOS, 2018 ID143 NC2 / LOCACAO DE ESTANDES E MONTAGEM D Component 1: Sustainable Request for Quo Single Stage - On 2018-04- 2018-09- 2018-06- 2018-09- 2018-08- 2018-10- IBRD / 82760 Post Limited 23,437.50 31,009.59 Completed E EXPOSICAO PARA O EVE Regional Development tations e Envelope 10 18 05 20 04 05 NTO FESTA DO BODE EM M OSSORO, 2018 ID148 NC2 / LOCACAO DE Component 1: Sustainable Request for Quo Single Stage - On 2018-08- 2018-10- 2018-12- ESTANDES E MONTAGEM D IBRD / 82760 Post Limited 62,500.00 0.00 Canceled Regional Development tations e Envelope 10 05 04 E EXPOSICAO PARA O EVE NTO FENACAN, 2018 ID153 NC2 / LOCACAO DE ESTANDES E MONTAGEM D Component 1: Sustainable Request for Quo Single Stage - On 2018-08- 2018-08- 2018-09- 2018-08- 2018-11- 2018-09- IBRD / 82760 Post Limited 23,437.50 18,709.62 Completed E EXPOSICAO PARA O EVE Regional Development tations e Envelope 04 23 29 29 28 13 NTO AGROPECUARIA DE LA JES, 2018 ID98 NC / SERVIÇOS DE M ARCENARIA, SONORIZACA O, COMUNICAÇÃO VISUAL Pending Im Component 2: Improving P Request for Bid Single Stage - On 2017-10- 2017-11- 2017-12- 2018-01- 2018-02- 2018-08- E MOBILIÁRIO SOB MEDIDA IBRD / 82760 Post Open - National 525,000.00 0.00 plementati ublic Services s e Envelope 27 01 13 12 16 15 PARA O LABORATÓRIO DE on ANATOMOHISTOPATOLOGI A, 02 CENTROS ONCOLÓGI COS E 07 HOSPITAIS DE UR GÊNCIA E EMERGÊNCIA ID121 NC / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-12- 2018-02- 2018-12- 2018-08- 2018-12- IBRD / 82760 Post Limited 62,500.00 13,444.46 Completed O DE EVENTOS PARA REALI Regional Development tations e Envelope 25 07 19 11 18 18 ZAÇÃO DO FEST BOSSA & J AZZ EM SMG/PIPA - RN 201 8 ID183NC / AQUISIÇÃO DE Component 1: Sustainable 2019-03- 2019-01- 2019-03- 2018-12- 2019-04- 2019-01- 2019-05- 2019-02- IBRD / 82760 Post Direct Selection Direct 40,625.00 35,151.29 Completed ESTANDES DA FIART (2019 Regional Development 20 03 25 13 29 15 29 26 ) ID179NC / AQUISIÇÃO DE Component 1: Sustainable 2019-07- 2019-08- 2019-08- 2019-07- 2019-09- 2019-09- 2019-10- 2019-10- ESTANDES DO EVENTO DO IBRD / 82760 Post Direct Selection Direct 25,000.00 10,479.53 Completed Regional Development 30 21 04 26 08 03 08 07 BRASIL MOSTRA BRASIL (2 019) ID142 NC2 / AQUISIÇÃO D E ESTANDES DA EXPOFRUI Component 1: Sustainable 2018-07- 2018-08- 2018-08- 2018-08- 2018-09- 2018-08- 2018-11- 2018-09- T- FEIRA INTERNACIONAL D IBRD / 82760 Post Direct Selection Direct 62,500.00 53,174.52 Completed Regional Development 30 14 04 13 08 20 07 13 A FRUTICULTURA TROPICA L IRRIGADA EM MOSSORO, 2018 ID199NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-02- 2019-01- 2019-02- 2019-02- 2019-03- 2019-08- 2019-04- IBRD / 82760 Post Direct Selection Direct 51,562.50 39,101.41 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 19 07 05 11 09 10 16 EVENTO BTL PORTUGAL - 2019 ID200NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2018-11- 2019-01- 2018-11- 2019-02- 2018-12- 2019-08- 2019-02- IBRD / 82760 Post Direct Selection Direct 43,750.00 33,016.50 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 27 07 23 11 21 10 04 EVENTO FEIRA VAKANTIEB EURS HOLANDA - 2019 ID201NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-10- 2019-01- 2019-09- 2019-02- 2019-10- 2019-08- 2019-12- IBRD / 82760 Post Direct Selection Direct 10,312.50 7,832.39 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 02 07 03 11 24 10 17 EVENTO MUNDO ABREU PO RTUGAL - 2019 ID202NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-07- 2019-01- 2019-06- 2019-02- 2019-07- 2019-08- 2019-08- IBRD / 82760 Post Direct Selection Direct 40,625.00 15,906.43 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 07 07 17 11 17 10 13 EVENTO MEETING BRASIL AMÉRICA DO SUL - 2019 ID203NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-02- 2019-01- 2019-01- 2019-02- 2019-03- 2019-08- 2019-04- IBRD / 82760 Post Direct Selection Direct 18,750.00 11,238.17 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 06 07 28 11 18 10 05 EVENTO FEMPTUR NATAL - 2019 ID204NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-03- 2019-01- 2019-02- 2019-02- 2019-04- 2019-08- 2019-04- IBRD / 82760 Post Direct Selection Direct 46,875.00 14,885.36 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 18 07 27 11 01 10 29 EVENTO WTM AMÉRICA LA TINA SÃO PAULO - 2019 ID205NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-01- 2019-02- 2019-08- IBRD / 82760 Post Direct Selection Direct 25,000.00 0.00 Canceled S PARA PARTICIPAÇÃO NO Regional Development 02 07 11 10 EVENTO BRAZTOA 2019 ID206NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-01- 2019-02- 2019-03- 2019-08- 2019-10- IBRD / 82760 Post Direct Selection Direct 26,562.50 11,084.28 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 07 11 19 10 19 EVENTO B2B E ROADSHOW FRT - 2019 Page 9 ID207NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-04- 2019-01- 2019-03- 2019-02- 2019-04- 2019-08- 2019-05- IBRD / 82760 Post Direct Selection Direct 18,750.00 9,365.14 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 03 07 28 11 25 10 08 EVENTO AVIESP 2019 ID208NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2019-01- 2019-04- 2019-01- 2019-01- 2019-02- 2019-05- 2019-08- 2019-07- IBRD / 82760 Post Direct Selection Direct 25,000.00 11,710.17 Completed S PARA PARTICIPAÇÃO NO Regional Development 02 16 07 17 11 24 10 13 EVENTO BNTM MERCOSUL - 2019 ID209 NC / SERVIÇOS DE I NSTALAÇÃO DE CONDICIO Component 2: Improving P Request for Quo Single Stage - On 2018-09- 2018-11- 2019-05- IBRD / 82760 Post Open - National 15,625.00 0.00 Canceled NADORES DE AR TIPO SLIT ublic Services tations e Envelope 29 24 23 PARA BIBLIOTECA E MEMO RIAL CÂMARA CASCUDO ID198NC / CONTRATAÇÃO DE SERVIÇOS DE VEICULAÇ Component 1: Sustainable 2018-09- 2018-11- 2018-09- 2018-10- 2019-04- IBRD / 82760 Prior Direct Selection Direct 46,875.00 0.00 Canceled ÃO DE CAMPANHA TURÍSTI Regional Development 12 09 17 22 20 CA NA REVISTA DE BORDO AZUL VIAGENS - 2018 ID199 NC / SERVIÇOS DE I Component 1: Sustainable Request for Quo Single Stage - On 2018-10- 2018-12- 2018-03- 2019-06- MPRESSÃO DE MATERIAL G IBRD / 82760 Post Open - National 62,500.00 73,459.87 Signed Regional Development tations e Envelope 29 24 09 22 RÁFICO DE DIVULGAÇÃO T URÍSTICA 2018 ID210 NC / SERVIÇOS EVE NTUAIS DE BUFFET, CONFO Component 1: Sustainable Request for Quo Single Stage - On 2018-11- 2019-02- 2019-01- 2019-07- IBRD / 82760 Post Limited 73,703.15 0.00 Canceled RME DEMANDA, PARA CAP Regional Development tations e Envelope 10 05 05 04 ACITAÇÕES DO PROJETO N O TERRITÓRIO AÇU-MOSSO RÓ ID211 NC / SERVIÇOS EVE NTUAIS DE BUFFET, CONFO Component 1: Sustainable Request for Quo Single Stage - On 2018-11- 2019-01- 2019-07- RME DEMANDA, PARA CAP IBRD / 82760 Post Limited 19,906.25 0.00 Canceled Regional Development tations e Envelope 10 05 04 ACITAÇÕES DO PROJETO N O TERRITÓRIO SERTÃO CE NTRAL, 2019 ID212 NC / SERVIÇOS EVE NTUAIS DE BUFFET, CONFO Component 1: Sustainable Request for Quo Single Stage - On 2018-11- 2019-01- 2019-07- IBRD / 82760 Post Limited 29,687.50 0.00 Canceled RME DEMANDA, PARA CAP Regional Development tations e Envelope 10 05 04 ACITAÇÕES DO PROJETO N O TERRITÓRIO TRAIRI, 201 9 ID196NC / SERVIÇOS DE D Component 1: Sustainable Request for Bid Open - Internatio Single Stage - On 2018-09- 2018-09- 2018-11- 2018-12- 2019-01- 2019-07- IVULGAÇÃO DO DESTINO D IBRD / 82760 Prior 250,000.00 0.00 Canceled Regional Development s nal e Envelope 18 23 04 04 08 07 O RN NA HOLANDA ID142 NC / LOCAÇÃO DE E STANDES E MONTAGEM DA Component 1: Sustainable 2018-04- 2018-04- 2018-04- 2018-06- 2018-11- EXPOFRUIT PARA A FEIRA I IBRD / 82760 Post E-Auctions Open 62,500.00 0.00 Canceled Regional Development 05 10 29 03 30 NTERNACIONAL DA FRUTIC ULTURA TROPICAL IRRIGAD A EM MOSSORÓ, 2018 ID156 NC2 / AQUISICAO D Component 1: Sustainable Request for Quo Single Stage - On 2018-05- 2018-07- 2018-09- E PAINEIS EXPOSITIVO PAR IBRD / 82760 Post Limited 28,652.00 0.00 Canceled Regional Development tations e Envelope 12 07 05 A O MUSEU CAFE FILHO ID 82 NC / SERVIÇOS PARA MONTAGEM E PRODUÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2017-07- 2018-08- 2017-09- 2017-10- DE EVENTOS PARA REALIZ IBRD / 82760 Post Limited 50,000.00 0.00 Canceled Regional Development tations e Envelope 31 17 19 19 AÇÃO DO FESTIVAL DE CIN EMA EM SÃO MIGUEL DO G OSTOSO/RN ID125 NC / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-08- O DE EVENTOS PARA REALI IBRD / 82760 Post Limited 15,625.00 0.00 Canceled Regional Development tations e Envelope 25 19 18 ZAÇÃO DO FESTIVAL GAST RONÔMICO DE BAÍA FORM OSA, 2018 ID45 NC / LOCACAO E ORG ANIZACAO DE ESPACO PAR Component 1: Sustainable 2017-06- 2017-06- 2017-06- 2017-07- IBRD / 82760 Post Direct Selection Direct 2,763.75 0.00 Canceled A O EVENTO 1 WORKSHOP Regional Development 02 02 23 23 ILHA BELA, 2017, CEARA ID59 NC / LOCACAO DE ES PACO E ORGANIZACAO DE Component 1: Sustainable 2017-09- 2017-09- 2017-09- 2017-10- IBRD / 82760 Post Direct Selection Direct 8,000.00 0.00 Canceled ESTANDE PARA PARTICIPA Regional Development 02 02 23 23 CAO NO EVENTO EXPO AB REU, LISBOA, PORTUGAL- 2 017 ID117 NC / LOCAÇÃO DE E SPAÇO E ORGANIZAÇÃO PA Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-08- IBRD / 82760 Post Limited 10,312.50 0.00 Canceled RA PARTICIPAÇÃO NO EVE Regional Development tations e Envelope 25 19 18 NTO ROADSHOW SOLFERIA S, PORTUGAL - 2018 ID119 NC / LOCAÇÃO DE E SPAÇO E ORGANIZAÇÃO PA Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-08- IBRD / 82760 Post Limited 5,625.00 0.00 Canceled RA O EVENTO DIA DO BRA Regional Development tations e Envelope 25 19 18 SIL NA ARGENTINA - 2018 ID178NC / SERVIÇOS DE O Component 1: Sustainable Request for Quo Single Stage - On 2018-09- 2018-10- 2019-04- RGANIZAÇÃO DO EVENTO IBRD / 82760 Post Limited 93,750.00 0.00 Canceled Regional Development tations e Envelope 04 30 28 TERRA DO DESCOBRIMENT O 2018 ID105 NC / LOCAÇÃO E OR Component 1: Sustainable 2017-12- 2017-12- 2018-01- 2018-07- GANIZAÇÃO DE ESPAÇO PA IBRD / 82760 Post Direct Selection Direct 3,125.00 0.00 Canceled Regional Development 20 25 29 28 RA O EVENTO ILHA BELA, 2 018, BRASIL ID104 NC / LOCAÇÃO DE E STANDES E SERVIÇOS DE Component 1: Sustainable 2017-12- 2017-12- 2018-01- 2018-07- IBRD / 82760 Post Direct Selection Direct 15,625.00 0.00 Canceled MONTAGEM PARA A BNTM Regional Development 20 25 29 28 POW WOW, 2018, FORTALE ZA, CE ID213 NC / SERVIÇOS DE L OCAÇÃO E MONTAGEM DE Component 1: Sustainable 2019-03- 2019-05- 2019-03- 2019-05- 2019-04- 2019-06- 2019-05- 2019-07- IBRD / 82760 Post Direct Selection Direct 18,750.00 15,539.61 Completed STANDS PARA O FESTIVAL Regional Development 13 29 13 03 03 12 03 02 DE TURISMO DAS CATARAT AS - 2019 ID214 NC / LOCAÇÃO DE E SPAÇO E ORGANIZAÇÃO PA Component 1: Sustainable 2019-03- 2019-03- 2019-04- 2019-10- IBRD / 82760 Post Direct Selection Direct 3,125.00 0.00 Canceled RA PARTICIPAÇÃO NO EVE Regional Development 13 18 22 19 NTO ROADSHOW SOLFERIA S, PORTUGAL - 2018 ID215 NV / LOCAÇÃO E MO Component 1: Sustainable 2019-08- 2019-08- 2019-08- 2019-08- 2019-09- 2019-09- 2020-03- 2019-10- NTAGEM DE ESTANDES PA IBRD / 82760 Post Direct Selection Direct 46,000.00 18,730.28 Completed Regional Development 01 15 06 13 10 17 08 15 RA EXPO ABAV, 2019. SÃO PAULO, SP ID216 NC / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable Request for Quo Single Stage - On 2019-03- 2019-05- 2019-11- IBRD / 82760 Post Limited 15,625.00 0.00 Canceled O DE EVENTOS PARA REALI Regional Development tations e Envelope 18 13 09 ZAÇÃO DO FESTIVAL GAST RONÔMICO DE PIPA, 2019 ID217 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable 2019-10- 2019-10- 2019-10- 2019-09- 2019-11- 2019-10- 2020-05- 2019-11- IBRD / 82760 Post Direct Selection Direct 15,625.00 9,365.14 Completed EXPOSIÇÃO PARA FESTIVAL Regional Development 02 01 07 13 11 30 09 20 DE TURISMO DE GRAMADO , FESTURIS, 2019 ID218 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable Request for Quo Single Stage - On 2019-05- 2020-03- 2019-06- 2019-07- 2019-12- 2019-08- IBRD / 82760 Post Limited 15,625.00 10,580.25 Completed EXPOSIÇÃO PARA O EVENT Regional Development tations e Envelope 05 03 30 31 27 29 O DO FESTIVAL DE SERRA DE SÃO BENTO, 2019 ID104 NC-2 / LOCAÇÃO DE ESTANDES E SERVIÇOS DE Component 1: Sustainable 2019-04- 2019-04- 2019-04- 2019-04- 2019-05- 2019-05- 2019-11- 2019-06- IBRD / 82760 Post Direct Selection Direct 15,625.00 11,321.75 Completed MONTAGEM PARA MATCHE Regional Development 10 29 15 05 20 28 16 25 R, 2019, FORTALEZA, CE ID125 NC-2 / SERVIÇOS PA RA MONTAGEM E PRODUÇ Component 1: Sustainable Request for Quo Single Stage - On 2019-05- 2019-10- 2019-06- 2019-11- 2019-12- 2019-11- ÃO DE EVENTOS PARA REA IBRD / 82760 Post Limited 23,437.50 16,708.02 Completed Regional Development tations e Envelope 05 24 30 07 27 27 LIZAÇÃO DO FESTIVAL DE CINEMA EM SÃO MIGUEL D O GOSTOSO/RN ID117 NC-2 / LOCAÇÃO DE ESPAÇO E ORGANIZAÇÃO P Component 1: Sustainable 2019-09- 2019-08- 2019-09- 2019-08- 2019-10- 2019-09- 2020-04- 2019-10- IBRD / 82760 Post Direct Selection Direct 31,250.00 26,800.00 Completed ARA O EVENTO FIT AMERIC Regional Development 02 23 07 23 12 09 09 16 A LATINA, BUENOS AIRES, ARGENTINA - 2019 ID219 NC / MONTAGEM DE ESTANDES E SERVIÇOS DE Component 1: Sustainable 2019-07- 2019-07- 2019-07- 2019-06- 2019-08- 2019-07- 2020-02- 2019-08- IBRD / 82760 Post Direct Selection Direct 18,750.00 11,238.17 Completed ALIMENTAÇÃO PARA AVIRR Regional Development 02 11 07 28 11 30 07 14 P, 2019. RIBEIRÃO PRETO, SP ID119 NC-2 / LOCAÇÃO E MONTAGEM DE EXPOSIÇÃO Component 1: Sustainable 2019-09- 2019-08- 2019-09- 2019-08- 2019-10- 2019-09- 2020-04- 2019-11- IBRD / 82760 Post Direct Selection Direct 5,625.00 3,386.93 Completed PARA FESTIVAL DE TURISM Regional Development 02 12 07 12 12 17 09 05 O DE JOÃO PESSOA, JPA TR AVEL MARKET, 2019 ID220 NC / LOCAÇÃO E M Component 1: Sustainable 2019-10- 2019-10- 2019-11- 2020-05- ONTAGEM PARA 3ª FEIRA D IBRD / 82760 Post Direct Selection Direct 12,500.00 0.00 Canceled Regional Development 01 06 10 08 E TURISMO REGIONAL MOS SORÓ, 2019 ID221 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable 2019-07- 2019-07- 2019-08- 2020-02- IBRD / 82760 Post Direct Selection Direct 15,625.00 0.00 Canceled EXPOSIÇÃO PARA RN DAY F Regional Development 01 06 10 06 LYTOUR, 2019, SANTOS/SP E CAMPINAS/SP ID178NC-3 / SERVIÇOS PA RA MONTAGEM E PRODUÇ ÃO DE EVENTOS PARA REA Component 1: Sustainable 2019-04- 2019-07- 2019-05- 2019-07- 2019-06- 2019-08- 2019-12- 2019-10- IBRD / 82760 Post Direct Selection Direct 93,750.00 56,468.25 Completed LIZAÇÃO DO CIRCUITO FES Regional Development 30 16 05 10 09 02 06 22 T BOSSA & JAZZ EM PIPA, MOSSORÓ E SÃO MIGUEL D O GOSTOSO - RN 2019 ID178NC-2 / SERVIÇOS PA RA MONTAGEM E PRODUÇ ÃO DE EVENTOS PARA REA Component 1: Sustainable Request for Quo Single Stage - On 2019-05- 2019-06- 2019-12- IBRD / 82760 Post Limited 93,750.00 0.00 Canceled LIZAÇÃO DO CIRCUITO FES Regional Development tations e Envelope 05 30 27 T BOSSA & JAZZ EM PIPA, MOSSORÓ E SÃO MIGUEL D O GOSTOSO - RN 2019 ID222 NC / SERVIÇOS DE ORGANIZAÇÃO DE EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2019-06- 2019-07- 2020-01- IBRD / 82760 Post Open - National 11,463.12 0.00 Canceled S DA III FEIRA DE TALENTO Regional Development tations e Envelope 01 27 23 S DO ARTESANATO DE MO SSORÓ, 2019 ID223 NC / SERVIÇOS DE ORGANIZAÇÃO DE EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2019-06- 2019-07- 2019-08- 2020-01- 2019-09- IBRD / 82760 Post Open - National 14,537.50 5,666.20 Completed S DA IV FEIRA DE TALENTO Regional Development tations e Envelope 01 27 01 23 28 S DO ARTESANATO DO VAL E DO ASSU, 2019 ID224 NC / SERVIÇOS DE ORGANIZAÇÃO DE EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2019-06- 2019-08- 2019-07- 2020-02- 2019-08- IBRD / 82760 Post Open - National 19,062.50 7,563.87 Completed S DA V FEIRA DE TALENTO Regional Development tations e Envelope 17 12 24 08 20 NA FAMUSE, EM CAICÓ, 20 19 ID226 NC / MONTAGEM E PRODUÇÃO PARA EVENTO Component 1: Sustainable Request for Quo Single Stage - On 2019-06- 2019-08- 2019-07- 2020-02- 2019-08- IBRD / 82760 Post Open - National 15,625.00 9,171.92 Completed DA 3ª EXPOSIÇÃO AGROPE Regional Development tations e Envelope 15 10 05 06 12 CUÁRIA DE CARAÚBAS - RN , 2019 ID148 NC / LOCAÇÃO DE E Component 1: Sustainable 2018-04- 2018-04- 2018-04- 2018-06- 2018-11- STANDES E MONTAGEM DE IBRD / 82760 Post E-Auctions Open 62,500.00 0.00 Canceled Regional Development 05 10 29 03 30 EXPOSIÇÃO PARA O EVENT O FENACAN, 2018 ID143 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable 2018-04- 2018-04- 2018-04- 2018-06- 2018-11- IBRD / 82760 Post E-Auctions Open 23,437.50 0.00 Canceled EXPOSIÇÃO PARA O EVENT Regional Development 05 10 29 03 30 O FESTA DO BODE EM MOS SORÓ, 2018 ID227 NC / MONTAGEM E Component 1: Sustainable Request for Quo Single Stage - On 2019-10- 2019-12- 2019-11- 2020-06- 2019-11- PRODUÇÃO PARA EVENTO IBRD / 82760 Post Open - National 12,500.00 7,672.88 Completed Regional Development tations e Envelope 14 09 14 06 23 DO 3º CAJU AGRO FEST, PO RTALEGRE - RN, 2019 ID228 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 3: Public Sect 2019-10- 2020-02- 2019-10- 2021-11- 2019-11- 2020-09- 2020-05- 2021-10- IBRD / 82760 Post Direct Selection Direct 9,375.00 5,389.00 Completed S PARA PARTICIPAÇÃO NO or Management 15 12 20 26 24 21 22 21 EVENTO "VI RODADA DE N EGÓCIOS", 2019 ID229 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 3: Public Sect Request for Bid Single Stage - On 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- S PARA PARTICIPAÇÃO NO IBRD / 82760 Post Open - National 31,250.00 0.00 Canceled or Management s e Envelope 09 14 25 25 29 26 EVENTO "MOSTRA PAIXÃO POTIGUAR" E "FEIRA DE A CESSO A MERCADOS" 2020 . ID99 NC / SERVIÇOS DE M ARCENARIA E MÓVEIS PROJ Component 2: Improving P Request for Bid Single Stage - On 2020-03- 2020-03- 2020-04- 2020-05- 2020-06- 2020-12- IBRD / 82760 Post Open - National 781,250.00 0.00 Canceled ETADOS PARA O HOSPITAL ublic Services s e Envelope 09 14 25 25 29 26 DA MULHER E OS 07(SETE) HOSPITAIS REGIONAIS ID99 1NC / SERVIÇOS DE S Component 2: Improving P Request for Bid Single Stage - On 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- 2021-01- ONORIZAÇÃO PARA O HOS IBRD / 82760 Post Open - National 218,750.00 0.00 Canceled ublic Services s e Envelope 24 29 10 09 14 10 PITAL DA MULHER ID99 2 NC / SERVIÇO DE SI Under Impl Component 2: Improving P Request for Bid Single Stage - On 2020-03- 2022-05- 2020-03- 2020-05- 2022-06- 2020-06- 2022-07- 2020-07- 2021-01- NALIZAÇÃO VISUAL PARA O IBRD / 82760 Post Open - National 93,750.00 0.00 ementatio ublic Services s e Envelope 24 15 29 10 30 09 11 14 10 HOSPITAL DA MULHER n ID107 NC-2 / MONTAGEM DE ESTANDES E SERVIÇOS Component 1: Sustainable 2020-07- 2020-07- 2020-08- 2021-02- IBRD / 82760 Post Direct Selection Direct 50,000.00 0.00 Canceled DE ALIMENTAÇÃO PARA AV Regional Development 17 22 26 22 IRRP, 2018. RIBEIRÃO PRET O, SP ID109 NC-2 / LOCAÇÃO E Component 1: Sustainable 2020-07- 2020-07- 2020-08- 2021-02- MONTAGEM DE ESTANDES IBRD / 82760 Post Direct Selection Direct 78,125.00 0.00 Canceled Regional Development 17 22 26 22 PARA EXPO ABAV, 2018. S ÃO PAULO, SP. ID111 NC-2 / LOCAÇÃO E MONTAGEM DE EXPOSIÇÃO Component 1: Sustainable 2020-07- 2020-07- 2020-08- 2021-02- IBRD / 82760 Post Direct Selection Direct 9,375.00 0.00 Canceled PARA FESTIVAL DE TURISM Regional Development 17 22 26 22 O DE JOÃO PESSOA, 2018 ID115 NC-2 / LOCAÇÃO DE ESTANDES E MONTAGEM D Component 1: Sustainable 2020-07- 2020-07- 2020-08- 2021-02- E EXPOSIÇÃO PARA O EVE IBRD / 82760 Post Direct Selection Direct 28,125.00 0.00 Canceled Regional Development 17 22 26 22 NTO MEETING BRAZIL, REA LIZADO EM MONTIVIDEO, S ANTIAGO, BOGOTA E LIMA – 2018 ID108 NC-2 / LOCAÇÃO DE Component 1: Sustainable 2020-07- 2020-07- 2020-08- 2021-02- ESTANDE PARA FEIRA DE T IBRD / 82760 Post Direct Selection Direct 15,625.00 0.00 Canceled Regional Development 17 22 26 22 URISMO MOSSORÓ, 2018 ID110 NC-2 / LOCAÇÃO DE ESTANDES E MONTAGEM D Component 1: Sustainable 2020-07- 2020-07- 2020-08- 2021-02- IBRD / 82760 Post Direct Selection Direct 29,687.50 0.00 Canceled E EXPOSIÇÃO PARA FEIRÃO Regional Development 17 22 26 22 FLYTOUR, 2018, SANTOS/S P E CAMPINAS/SP ID113 NC-2 / LOCAÇÃO DE ESTANDES E MONTAGEM D Component 1: Sustainable 2020-07- 2020-07- 2020-08- 2021-02- IBRD / 82760 Post Direct Selection Direct 17,187.50 0.00 Canceled E EXPOSIÇÃO PARA FESTIV Regional Development 17 22 26 22 AL DE TURISMO DE GRAMA DO, 2018 SP ID67 3 NC-2 / LOCAÇÃO E Component 1: Sustainable 2020-07- 2020-07- 2020-08- 2021-02- ORGANIZAÇÃO DE ESPAÇO IBRD / 82760 Post Direct Selection Direct 46,250.00 0.00 Canceled Regional Development 17 22 26 22 NO EVENTO FRT, NATAL 20 18 ID108 NC-3 / LOCAÇÃO DE Component 1: Sustainable 2018-05- 2018-06- 2018-05- 2018-05- 2018-06- 2018-09- 2018-12- 2018-12- ESTANDE PARA FEIRA DE T IBRD / 82760 Post Direct Selection Direct 15,625.00 9,766.39 Completed Regional Development 18 22 23 14 27 14 24 14 URISMO MOSSORÓ, 2018 ID110 NC-3 / LOCAÇÃO DE ESTANDES E MONTAGEM D Component 1: Sustainable 2018-05- 2018-07- 2018-05- 2018-05- 2018-06- 2018-08- 2018-12- 2018-10- IBRD / 82760 Post Direct Selection Direct 29,687.50 17,416.49 Completed E EXPOSIÇÃO PARA FEIRÃO Regional Development 15 11 20 09 24 23 21 17 FLYTOUR, 2018, SANTOS/S P E CAMPINAS/SP ID113 NC-3 / LOCAÇÃO DE ESTANDES E MONTAGEM D Component 1: Sustainable 2018-04- 2018-07- 2018-05- 2018-03- 2018-06- 2018-09- 2018-12- 2018-11- IBRD / 82760 Post Direct Selection Direct 17,187.50 9,977.17 Completed E EXPOSIÇÃO PARA FESTIV Regional Development 26 04 01 30 05 29 02 30 AL DE TURISMO DE GRAMA DO, 2018 SP ID67 3 NC-3 / LOCAÇÃO E Component 1: Sustainable 2018-04- 2018-04- 2018-04- 2018-03- 2018-05- 2018-05- 2018-11- 2018-08- ORGANIZAÇÃO DE ESPAÇO IBRD / 82760 Post Direct Selection Direct 46,250.00 28,908.51 Completed Regional Development 02 13 07 27 12 15 08 08 NO EVENTO FRT, NATAL 20 18 ID107 NC-3 / MONTAGEM DE ESTANDES E SERVIÇOS Component 1: Sustainable 2018-06- 2018-07- 2018-06- 2018-05- 2018-07- 2018-07- 2019-01- 2018-09- IBRD / 82760 Post Direct Selection Direct 50,000.00 11,603.84 Completed DE ALIMENTAÇÃO PARA AV Regional Development 16 13 21 17 26 28 22 06 IRRP, 2018. RIBEIRÃO PRET O, SP ID109 NC-3 / LOCAÇÃO E Component 1: Sustainable 2018-06- 2018-07- 2018-06- 2018-06- 2018-07- 2018-09- 2019-01- 2018-10- MONTAGEM DE ESTANDES IBRD / 82760 Post Direct Selection Direct 78,125.00 38,139.80 Completed Regional Development 13 17 18 22 23 29 19 19 PARA EXPO ABAV, 2018. S ÃO PAULO, SP ID111 NC-3 / LOCAÇÃO E MONTAGEM DE EXPOSIÇÃO Component 1: Sustainable 2018-04- 2018-06- 2018-04- 2018-04- 2018-05- 2018-08- 2018-11- 2018-11- IBRD / 82760 Post Direct Selection Direct 9,375.00 5,586.37 Completed PARA FESTIVAL DE TURISM Regional Development 15 26 20 30 25 23 21 08 O DE JOÃO PESSOA, 2018 ID115 NC-3 / LOCAÇÃO DE ESTANDES E MONTAGEM D Component 1: Sustainable 2018-03- 2018-03- 2018-03- 2018-02- 2018-04- 2018-07- 2018-10- 2018-09- E EXPOSIÇÃO PARA O EVE IBRD / 82760 Post Direct Selection Direct 28,125.00 17,202.00 Completed Regional Development 07 08 12 21 16 12 13 21 NTO MEETING BRAZIL, REA LIZADO EM MONTIVIDEO, S ANTIAGO, BOGOTA E LIMA – 2018 Page 10 ID82 NC-2 / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable Request for Quo Single Stage - On 2017-05- 2017-07- 2017-11- 2018-01- 2017-12- O DE EVENTOS PARA REALI IBRD / 82760 Post Open - National 23,437.50 14,365.28 Completed Regional Development tations e Envelope 14 09 17 05 22 ZAÇÃO DO FESTIVAL DE CI NEMA EM SÃO MIGUEL DO GOSTOSO/RN, 2017 ID231 NC / CONTRATAÇÃO DE AGÊNCIA DE PUBLICIDA DE PARA CRIAÇÃO, VEICUL AÇÃO E IMPULSIONAMENT Component 1: Sustainable Request for Quo Single Stage - On 2020-07- 2020-09- 2020-11- 2021-03- 2021-05- IBRD / 82760 Post Open - National 56,179.77 39,217.72 Completed O EM MÍDIAS DIGITAIS DE Regional Development tations e Envelope 27 21 25 20 14 CAMPANHA SOBRE O SELO DE SEGURANÇA SANITÁRIA DO ESTADO E RETOMADA DO TURISMO REGIONAL, 2 020 ID232 NC / CONTRATAÇÃO DE EMPRESA DE RECEPTIV Component 1: Sustainable Request for Quo Single Stage - On 2020-12- 2021-01- 2021-01- 2021-07- 2021-06- O PARA EXECUTAR ROTEIR IBRD / 82760 Post Open - National 18,726.59 15,013.18 Completed Regional Development tations e Envelope 06 31 26 30 30 OS PARA JORNALISTAS ESP ECIALIZADOS, FOTÓGRAFO S E INFLUENCIADORES DIG ITAIS, 2021 ID233NC / CONTRATAÇÃO DE EMPRESA PARA ORGANI ZAÇÃO E MONTAGEM DE E Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2020-07- 2020-09- 2021-03- STANDE, COM PISO, PARA IBRD / 82760 Post Open - National 9,363.29 0.00 plementati Regional Development tations e Envelope 27 21 20 REALIZAÇÃO DE AÇÕES PR on OMOCIONAIS EM SHOPPIN GS (NATAL, MOSSORÓ/RN E CAMPINA GRANDE/PB) ID83 NC-1 / LOCAÇÃO DE ESTANDES E MONTAGEM D Component 1: Sustainable Request for Quo Single Stage - On 2017-06- 2017-08- 2017-07- 2018-02- 2017-09- IBRD / 82760 Post Open - National 15,625.00 9,278.59 Completed E EXPOSIÇÃO PARA O EVE Regional Development tations e Envelope 26 21 29 17 13 NTO DO FESTIVAL DE SERR A DE SÃO BENTO, 2017 ID198NC-1 / CONTRATAÇà O DE SERVIÇOS DE VEICUL Component 1: Sustainable 2018-11- 2018-10- 2018-11- 2018-08- 2018-12- 2018-12- 2019-06- 2019-04- IBRD / 82760 Post Direct Selection Direct 46,875.00 29,011.29 Completed AÇÃO DE CAMPANHA TURÍ Regional Development 09 25 14 06 19 11 17 24 STICA NA REVISTA DE BOR DO AZUL VIAGENS – 2018 ID118 NC / LOCAÇÃO DE E SPAÇO E ORGANIZAÇÃO D Component 1: Sustainable Request for Quo Single Stage - On 2017-12- 2018-02- 2018-08- E ESTANDE PARA PARTICIP IBRD / 82760 Post Limited 10,312.50 0.00 Canceled Regional Development tations e Envelope 25 19 18 AÇÃO NO EVENTO EXPO AB REU, LISBOA, PORTUGAL- 2 018 ID177NC / AQUISIÇÃO DE Component 1: Sustainable Request for Quo Single Stage - On 2018-09- 2018-10- 2019-04- CAMISETAS DA CAMPANHA IBRD / 82760 Post Limited 12,500.00 0.00 Canceled Regional Development tations e Envelope 04 30 28 "TUDO COMEÇA AQUI" ID230 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 3: Public Sect Request for Bid Single Stage - On 2019-10- 2019-10- 2019-12- 2019-12- 2020-02- 2020-08- IBRD / 82760 Post Open - National 9,687.50 0.00 Canceled S PARA PARTICIPAÇÃO NO or Management s e Envelope 15 20 01 31 04 02 EVENTO "MOSTRA PAIXÃO POTIGUAR", 2019 ID235 NC / CONTRATAÇÃO DE EMPRESA ESPECIALIZA Component 1: Sustainable Request for Quo Single Stage - On 2021-07- 2021-09- 2022-03- DA PARA PERFURAÇÃO E I IBRD / 82760 Post Open - National 18,285.71 0.00 Canceled Regional Development tations e Envelope 17 11 10 NSTALAÇÃO DE POÇOS AR TESIANOS EM COMUNIDAD ES RURAIS ID236 NC / SERVIÇOS DE E NGENHARIA NECESSÁRIOS Component 2: Improving P Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05- AO LICENCIAMENTO E REG IBRD / 82760 Post Open - National 120,284.17 0.00 Canceled ublic Services tations e Envelope 18 13 12 ULARIZAÇÕES DAS OBRAS ESTRUTURANTES – BLOCO I (REGIONAL NATAL) ID237 NC / SERVIÇOS DE E NGENHARIA NECESSÁRIOS Component 2: Improving P Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05- AO LICENCIAMENTO E REG IBRD / 82760 Post Open - National 51,265.77 0.00 Canceled ublic Services tations e Envelope 18 13 12 ULARIZAÇÕES DAS OBRAS ESTRUTURANTES – BLOCO II (REGIONAL MATO GRAND E) ID238 NC / SERVIÇOS DE E NGENHARIA NECESSÁRIOS Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05- AO LICENCIAMENTO E REG IBRD / 82760 Post Open - National 51,186.84 0.00 Canceled or Management tations e Envelope 18 13 12 ULARIZAÇÕES DAS OBRAS ESTRUTURANTES – BLOCO III (REGIONAL METROPOLIT ANA) ID239 NC / SERVIÇOS DE E NGENHARIA NECESSÁRIOS Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05- AO LICENCIAMENTO E REG IBRD / 82760 Post Open - National 25,214.12 0.00 Canceled or Management tations e Envelope 18 13 12 ULARIZAÇÕES DAS OBRAS ESTRUTURANTES – BLOCO IV (REGIONAL MOSSORÓ) ID240 NC / SERVIÇOS DE E NGENHARIA NECESSÁRIOS Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05- AO LICENCIAMENTO E REG IBRD / 82760 Post Open - National 45,960.82 0.00 Canceled or Management tations e Envelope 18 13 12 ULARIZAÇÕES DAS OBRAS ESTRUTURANTES – BLOCO V (REGIONAL ASSU) ID241 NC / SERVIÇOS DE E NGENHARIA NECESSÁRIOS Component 2: Improving P Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05- AO LICENCIAMENTO E REG IBRD / 82760 Post Open - National 13,466.78 0.00 Canceled ublic Services tations e Envelope 18 13 12 ULARIZAÇÕES DAS OBRAS ESTRUTURANTES – BLOCO VI (REGIONAL ALTO OESTE) ID242 NC / SERVIÇOS DE E NGENHARIA NECESSÁRIOS Component 3: Public Sect Request for Quo Single Stage - On 2021-09- 2021-11- 2022-05- AO LICENCIAMENTO E REG IBRD / 82760 Post Open - National 43,447.61 0.00 Canceled or Management tations e Envelope 18 13 12 ULARIZAÇÕES DAS OBRAS ESTRUTURANTES – BLOCO VII (REGIONAL SERIDÓ) ID243 NC / SERVIÇOS DE L Component 1: Sustainable Request for Quo Single Stage - On 2021-12- 2022-01- 2022-03- 2022-07- EVANTAMENTO DA SITUAÇ IBRD / 82760 Post Open - National 99,811.68 105,551.88 Completed Regional Development tations e Envelope 05 30 25 29 ÃO DA MALHA VIÁRIA DO D ISTRITO I DO RN ID244 NC / SERVIÇOS DE MARCENARIA E MOBILIÁRI Component 2: Improving P Request for Quo Single Stage - On 2021-12- 2022-02- 2022-07- IBRD / 82760 Post Open - National 56,497.18 0.00 Canceled O SOB MEDIDA PARA O LA ublic Services tations e Envelope 07 01 31 BORATÓRIO DE ANATOHIS TOPATOLOGIA ID245 NC / AQUISIÇÃO DE SERVIÇOS DE INSTALAÇÃO Pending Im Component 1: Sustainable Request for Bid Single Stage - On 2022-02- 2022-02- 2022-03- 2022-04- 2022-06- 2022-11- DE CABEAMENTO ESTRUTU IBRD / 82760 Post Open - National 214,368.66 0.00 plementati Regional Development s e Envelope 09 14 28 27 01 28 RADO, PARA ATENDER ÀS on DEMANDAS DO PARQUE TE CNOLÓGICO DO RN ID246 NC / SERVIÇOS PAR A ORGANIZAÇÃO DE EVEN Component 1: Sustainable Request for Bid Single Stage - On 2022-04- 2022-05- 2022-06- 2022-07- 2022-08- 2022-11- TO PARA REALIZAÇÃODA I IBRD / 82760 Post Open - National 132,825.00 0.00 Canceled Regional Development s e Envelope 29 04 03 03 07 05 FEIRA NE DA AGRICULTURA FAMILIAR E ECONOMIA SOL IDÁRIA ID246 NC-1 / SERVIÇOS PA RA ORGANIZAÇÃO DE EVE Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-06- 2022-10- 2022-08- NTO PARA REALIZAÇÃO DA IBRD / 82760 Post Open - National 93,800.00 70,827.26 Completed Regional Development tations e Envelope 10 05 09 03 19 I FEIRA NE DA AGRICULTUR A FAMILIAR E ECONOMIA S OLIDÁRIA ID247 NC / SERVIÇOS DE S Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-06- 2022-10- 2022-08- UPORTE DE ENERGIA, INTE IBRD / 82760 Post Open - National 34,000.00 34,975.61 Completed Regional Development tations e Envelope 10 05 09 03 20 RNET E SEGURANÇA PARA FENAFS ID248 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2022-05- 2022-08- 2022-05- 2022-06- 2022-06- 2022-12- IBRD / 82760 Post Direct Selection Direct 12,960.00 0.00 Signed S PARA PARTICIPAÇÃO NO Regional Development 09 16 14 03 18 15 EVENTO FEMPTUR NATAL - 2022 ID249 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2022-05- 2022-07- 2022-05- 2022-06- 2022-06- 2022-12- IBRD / 82760 Post Direct Selection Direct 10,000.00 0.00 Completed S PARA PARTICIPAÇÃO NO Regional Development 09 26 14 06 18 15 EVENTO "VII RODADA DE N EGÓCIOS", 2022 ID250 NC / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable 2022-05- 2022-08- 2022-05- 2022-08- 2022-06- 2022-12- 2022-11- O DE EVENTOS PARA REALI IBRD / 82760 Post Direct Selection Direct 24,000.00 0.00 Completed Regional Development 09 04 14 22 18 15 25 ZAÇÃO DO FEST BOSSA & J AZZ EM SÃO MIGUEL DO G OSTOSO - RN 2022 ID251 NC / SERVIÇOS PAR A MONTAGEM E PRODUÇà Component 1: Sustainable 2022-05- 2022-09- 2022-05- 2022-10- 2022-06- 2022-12- O DE EVENTOS PARA REALI IBRD / 82760 Post Direct Selection Direct 30,000.00 0.00 Completed Regional Development 09 22 14 02 18 15 ZAÇÃO DO MOSTRA DE CIN EMA EM SÃO MIGUEL DO G OSTOSO/RN ID252 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-10- IBRD / 82760 Post Open - National 12,000.00 0.00 Completed EXPOSIÇÃO PARA O EVENT Regional Development tations e Envelope 14 09 07 O DO FESTIVAL DE SERRA DE SÃO BENTO, 2022 ID254 NC / LOCAÇÃO E M ONTAGEM DE EXPOSIÇÃO Component 1: Sustainable 2022-05- 2022-08- 2022-05- 2022-06- 2022-06- 2022-12- 2022-11- IBRD / 82760 Post Direct Selection Direct 9,800.00 0.00 Completed PARA FESTIVAL DE TURISM Regional Development 09 18 14 13 18 15 13 O DE FORTALEZA, 11º BTM TRAVEL MARKET, 2022 ID255 NC / LOCAÇÃO DE E STANDES E MONTAGEM DE Component 1: Sustainable 2022-05- 2022-09- 2022-05- 2022-07- 2022-06- 2022-12- IBRD / 82760 Post Direct Selection Direct 16,000.00 0.00 Completed EXPOSIÇÃO PARA FESTIVAL Regional Development 09 14 14 01 18 15 DE TURISMO DE GRAMADO , FESTURIS, 2022 ID256 NC / SERVIÇOS DE L OCAÇÃO E MONTAGEM DE Component 1: Sustainable 2022-05- 2022-09- 2022-05- 2022-09- 2022-06- 2022-12- 2022-12- IBRD / 82760 Post Direct Selection Direct 16,000.00 0.00 Completed STANDS PARA O FESTIVAL Regional Development 09 21 14 21 18 15 16 DE TURISMO DAS CATARAT AS - 2022 ID258 NC / LOCAÇÃO DE E SPAÇO E ORGANIZAÇÃO PA Component 1: Sustainable 2022-05- 2022-08- 2022-05- 2022-06- 2022-06- 2022-12- 2022-12- IBRD / 82760 Post Direct Selection Direct 40,000.00 0.00 Completed RA O EVENTO FIT AMERICA Regional Development 09 16 14 03 18 15 25 LATINA, BUENOS AIRES, AR GENTINA - 2022 ID259 NC / LOCAÇÃO E OR GANIZAÇÃO DE ESPAÇO PA Component 1: Sustainable 2022-05- 2022-08- 2022-05- 2022-08- 2022-06- 2022-12- 2022-10- IBRD / 82760 Post Direct Selection Direct 70,000.00 0.00 Completed RA O EVENTO MEETING BR Regional Development 09 30 14 16 18 15 29 ASIL - MISSÃO RN, 2022, A RGENTINA E CHILE ID261 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-05- 2022-11- 2022-06- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 40,000.00 39,194.34 Completed Regional Development tations e Envelope 14 09 25 06 23 S PARA FEIRA DE CAICÓ/RN - 2022 ID263 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-07- 2022-11- 2022-08- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 40,000.00 47,790.40 Completed Regional Development tations e Envelope 14 09 01 06 04 S PARA EXPOESTE EM CAR AÚBAS/RN - 2022 ID264 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 14,000.00 0.00 Completed Regional Development tations e Envelope 14 09 06 S PARA FEIRA DE JANDAÍRA /RN - 2022 ID265 NC / ORGANIZAÇÃO Pending Im E MONTAGEM DE ESTANDE Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- IBRD / 82760 Post Open - National 20,000.00 0.00 plementati S PARA CAPRIFEIRA DE AF Regional Development tations e Envelope 14 09 06 on ONSO BEZERRA/RN - 2022 ID266 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-08- 2022-11- 2022-08- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 20,000.00 29,015.77 Completed Regional Development tations e Envelope 14 09 01 06 21 S PARA EXPOSIÇÃO EM ASS U/RN - 2022 ID267 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 30,000.00 0.00 Completed Regional Development tations e Envelope 14 09 06 S PARA FESTA DE BODE EM MOSSOR/RN - 2022 ID268 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- 2022-09- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 30,000.00 0.00 Completed Regional Development tations e Envelope 14 09 06 16 S PARA EXPOLAJES EM LAJE S/RN - 2022 ID269 NC / ORGANIZAÇÃO Pending Im E MONTAGEM DE ESTANDE Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- IBRD / 82760 Post Open - National 20,000.00 0.00 plementati S PARA AGROFEST EM SÃO Regional Development tations e Envelope 14 09 06 on GONÇALO DO AMARANTE/ RN - 2022 ID270 NC / ORGANIZAÇÃO Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 20,000.00 0.00 plementati Regional Development tations e Envelope 14 09 06 S PARA FEIRA DE PAU DOS on FERROS/RN - 2022 ID271 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- 2022-10- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 40,000.00 0.00 Completed Regional Development tations e Envelope 14 09 06 29 S PARA FESTA DO BOI EM P ARNAMIRIM/RN - 2022 ID272 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- 2022-12- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 40,000.00 0.00 Completed Regional Development tations e Envelope 14 09 06 17 S PARA FENACAM EM NATA L/RN - 2022 ID273 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- IBRD / 82760 Post Open - National 16,000.00 0.00 Completed S PARA FEIRA DO AGRONE Regional Development tations e Envelope 14 09 06 GÓCIO EM JARDIM DO SERI DÓ/RN - 2022 ID274 NC / SERVIÇOS PAR A PESQUISA DE CAMPO E C Pending Im Component 1: Sustainable Request for Bid Single Stage - On 2022-05- 2022-05- 2022-07- 2022-08- 2022-09- 2022-12- OLETA DE DADOS PARA AV IBRD / 82760 Post Open - National 130,000.00 0.00 plementati Regional Development s e Envelope 18 23 04 03 07 06 ALIAÇÃO DE IMPACTO DOS on SUBPROJETOS DO SUBCOM PONENTE 1.2 ID257 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable 2022-05- 2022-05- 2022-06- 2022-12- IBRD / 82760 Post Direct Selection Direct 20,000.00 0.00 Canceled S PARA PARTICIPAÇÃO NO Regional Development 09 14 18 15 EVENTO MEETING BRAZIL AMÉRICA DO SUL - 2022 ID275 NC / ORGANIZAÇÃO Pending Im E MONTAGEM DE ESTANDE Component 1: Sustainable Request for Quo Single Stage - On 2022-06- 2022-08- 2022-11- IBRD / 82760 Post Open - National 20,000.00 0.00 plementati S PARA EXPOPATU NO MUN Regional Development tations e Envelope 15 10 08 on ICÍPIO DE PATU/RN - 2022 ID276 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable Request for Quo Single Stage - On 2022-06- 2022-08- 2022-11- 2022-12- IBRD / 82760 Post Open - National 20,000.00 0.00 Completed S PARA AGROFEST NO MU Regional Development tations e Envelope 15 10 08 17 NICÍPIO DE NÍSIA FLOREST A/RN - 2022 ID277 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable Request for Quo Single Stage - On 2022-06- 2022-08- 2022-11- S PARA EXPOSIÇÃO AGROP IBRD / 82760 Post Open - National 20,000.00 0.00 Canceled Regional Development tations e Envelope 15 10 08 ECUÁRIA DE CARAÚBAS NO MUNICÍPIO DE CARAÚBAS/ RN - 2022 ID260 NC / ORGANIZAÇÃO Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- E MONTAGEM DE ESTANDE IBRD / 82760 Post Open - National 30,000.00 0.00 Canceled Regional Development tations e Envelope 14 09 06 S PARA FEIRA DE LAGOA N OVA/RN - 2022 ID262 NC / ORGANIZAÇÃO E MONTAGEM DE ESTANDE Component 1: Sustainable Request for Quo Single Stage - On 2022-05- 2022-07- 2022-11- IBRD / 82760 Post Open - National 30,000.00 0.00 Canceled S PARA CAPRIFEIRA DE CO Regional Development tations e Envelope 14 09 06 RONEL EZEQUIEL/RN - 202 2 ID253 NC / LOCAÇÃO E M Component 1: Sustainable 2022-09- 2022-08- 2022-09- 2022-08- 2022-09- 2022-12- 2022-10- ONTAGEM DE ESTANDES P IBRD / 82760 Post Direct Selection Direct - National 50,000.00 0.00 Completed Regional Development 09 19 14 15 29 28 21 ARA EXPO ABAV, 2022. RE CIFE, PE ID280 NC / IMPLANTAÇÃO Under Impl Component 1: Sustainable 2023-01- 2023-02- 2023-03- 2023-06- DE SISTEMA DE ALERTA SO IBRD / 82760 Post Direct Selection Direct - National 550,000.00 0.00 ementatio Regional Development 30 04 11 09 NORO DA BARRAGEM DE L n UCRÉCIA ID 301 NC / SERVIÇOS PAR Pending Im A REALIZAÇÃO, MONTAGE Component 1: Sustainable Request for Quo Single Stage - On 2023-06- 2023-07- 2023-08- IBRD / 82760 Post Open - National 76,923.00 0.00 plementati M E ORGANIZAÇÃO DE EVE Regional Development tations e Envelope 04 30 05 on NTO - FEIRA ESTADUAL DA AGRICULTURA FAMILIAR ID 302 NC / SERVIÇOS DE SUPORTE DE ENERGIA, INT Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2023-05- 2023-07- 2023-08- ERNET E SEGURANÇA PAR IBRD / 82760 Post Open - National 38,462.00 0.00 plementati Regional Development tations e Envelope 07 02 31 A REALIZAÇÃO DA FEIRA E on STADUAL DA AGRICULTUR A FAMILIAR ID 303 NC / SERVIÇOS EVE NTUAIS DE FORNECIMENTO Pending Im , CONFORME DEMANDA, PA Component 1: Sustainable Request for Quo Single Stage - On 2023-04- 2023-05- 2023-11- IBRD / 82760 Post Open - National 24,538.00 0.00 plementati RA LOCAÇÃO DE ESPAÇO, Regional Development tations e Envelope 04 30 26 on ORGANIZAÇÃO DE ESTAND E E DE BUFFET PARA ENCO NTROS DE NEGÓCIOS ID 304 NC / SERVIÇOS POR Pending Im DEMANDA, DE LOCAÇÃO E Component 1: Sustainable Request for Quo Single Stage - On 2023-03- 2023-05- 2023-11- IBRD / 82760 Post Open - National 20,115.00 0.00 plementati ORGANIZAÇÃO DE ESTAND Regional Development tations e Envelope 20 15 11 on E EM EVENTOS REGIONAIS E NACIONAIS ID 305 NC / SERVIÇOS POR DEMANDA, DE IMPRESSÃO Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2023-03- 2023-05- 2023-11- GRÁFICA PARA DIVULGAÇà IBRD / 82760 Post Open - National 42,308.00 0.00 plementati Regional Development tations e Envelope 20 15 11 O DAS AÇÕES E DOS PROD on UTOS DOS BENEFICIÁRIOS DO PROJETO Page 11 ID 306 NC / SERVIÇOS EVE NTUAIS DE FORNECIMENTO , CONFORME DEMANDA, PA Pending Im Component 1: Sustainable Request for Quo Single Stage - On 2023-03- 2023-05- 2023-11- RA LOCAÇÃO DE ESPAÇO, IBRD / 82760 Post Open - National 69,558.00 0.00 plementati Regional Development tations e Envelope 27 22 18 SERVIÇOS DE HOSPEDAGE on M, MONTAGEM E PRODUÇà O DE EVENTOS, ORGANIZA ÇÃO DE ESTANDE E DE BU FFET ID 307 NC / LOCAÇÃO DE ESPAÇO PARA PARTICIPAÇ Component 1: Sustainable 2023-02- 2023-03- 2023-03- 2023-03- 2023-04- 2023-05- IBRD / 82760 Post Direct Selection Direct - National 50,000.00 0.00 Signed ÃO NA WTM LATINA AMÉRI Regional Development 26 07 03 07 07 07 CA + ILTM LATIN AMÉRICA ID 308 NC / LOCAÇÃO DE Component 1: Sustainable 2023-02- 2023-03- 2023-03- 2023-03- 2023-04- 2023-05- 2023-05- ESPAÇO PARA PARTICIPAÇ IBRD / 82760 Post Direct Selection Direct - National 15,385.00 0.00 Completed Regional Development 27 07 04 07 08 08 25 ÃO NA BNT MERCOSUL ID 310 NC / LOCAÇÃO DE Component 1: Sustainable 2023-03- 2023-03- 2023-03- 2023-03- 2023-04- 2023-05- ESPAÇO PARA PARTICIPAÇ IBRD / 82760 Post Direct Selection Direct - National 15,385.00 0.00 Signed Regional Development 20 07 25 29 29 29 ÃO NA FESTIVAL DAS CATA RATAS ID 311 NC / LOCAÇÃO DE Pending Im Component 1: Sustainable 2023-03- 2023-03- 2023-04- 2023-05- ESPAÇO PARA PARTICIPAÇ IBRD / 82760 Post Direct Selection Direct - National 67,308.00 0.00 plementati Regional Development 15 20 24 24 ÃO NA EDIÇÃO DO MEETIN on G MISSÃO RN ID 309 NC / LOCAÇÃO DE Component 1: Sustainable Request for Quo Single Stage - On 2023-03- 2023-05- 2023-06- ESPAÇO PARA PARTICIPAÇ IBRD / 82760 Post Open - National 15,385.00 0.00 Canceled Regional Development tations e Envelope 08 03 02 ÃO NA FEMPTUR RN Sustentavel XX/2015 / Contratacao direta de cons Component 1: Sustainable 2016-04- ultoria para apoiar na reali IBRD / 82760 Prior Direct Selection Direct 355,000.00 352,142.20 Signed Regional Development 05 zacao da Contratualizacao institucional do Governo do Rio Grande do Norte PE 06/2015 / Services and Component 1: Sustainable Request for Bid Single Stage - On Terminate 2015-10- 2015-10- equipment for the digitaliz IBRD / 82760 Prior Open - National 1,591,000.00 699,990.02 Regional Development s e Envelope d 02 23 ation of ITEP's archives. CONSULTING FIRMS Activity Reference No. Short List and Draft Opening of Technic Combined Evaluati Loan / Credit Market Appro Contract Type Estimated A Actual Amou Process Stat Expression of Inter Request for Propos Evaluation of Tech Contract Completio / Description Component Review Type Method Terms of Reference Request for Propos al Proposals / Minut on Report and Draft Signed Contract No. ach mount (US$) nt (US$) us est Notice als as Issued nical Proposal n als es Negotiated Contrac Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned t Actual Planned Actual Planned Actual ID89 CS / ELBORACAO DE Consultant Qual PROJETOS DE ENGENHARIA Component 1: Sustainable 2017-01-0 2017-02- 2017-03- 2017-03- 2017-04- 2017-06- 2017-07- 2017-11- IBRD / 82760 Post ification Selecti Open - National 270,484.00 56,865.87 Completed DE INFRAESTRUTURA DO P Regional Development 6 05 17 27 06 19 05 19 on ARQUE TECNOLOGICO ID91 CS / ELBORACAO DE PROJETOS DE ENGENHARIA Consultant Qual PARA ADEQUACAO DAS UN Component 2: Improving P 2017-02-0 2016-10- 2017-03- 2017-04- 2017-08- 2017-05- 2017-10- 2017-05- 2017-12- 2017-08- 2018-09- IBRD / 82760 Post ification Selecti Open - National 90,000.00 93,108.83 Completed IDADES DE SAUDE PARA R ublic Services 9 03 11 25 03 10 17 30 29 28 10 on ECEBIMENTOS DE EQUIPA MENTOS DE LEITOS DE UTI NEONATAL E TOMOGRAFO S ID78 CS / PROJETO DE DIN AMIZACAO E SUSTENTABILI Consultant Qual Component 1: Sustainable 2017-04-2 2017-04- 2017-06- 2017-07- 2017-08- 2017-05- 2018-08- 2018-12- DADE DO TURISMO NOS M IBRD / 82760 Post ification Selecti Open - National 228,571.43 241,261.79 Completed Regional Development 1 21 07 07 06 26 01 20 UNICIPIOS DE PASSA E FIC on A, SERRA DE SAO BENTO E MONTE DAS GAMELEIRAS. ID83 CS / APOIO A SUPERV Consultant Qual Component 3: Public Sect 2017-03-1 2017-04- 2017-05- 2017-05- 2017-07- 2018-07- ISAO SOCIAL E AMBIENTAL IBRD / 82760 Post ification Selecti Open - National 225,000.00 0.00 Canceled or Management 3 12 12 27 11 06 DAS OBRAS DO PROJETO on ID84 CS / GESTAO DA QUA Component 3: Public Sect Quality And Cos 2017-06-2 2017-07- 2017-08- 2017-09- 2017-10- 2017-11- 2017-11- 2018-11- IBRD / 82760 Post Open - National 489,979.91 0.00 Canceled LIDADE DO GASTO PUBLIC or Management t-Based Selectio 3 23 22 21 06 05 20 15 O n ID87 CS / ELABORACAO D E PROJETOS BASICOS, EXE Consultant Qual Component 2: Improving P 2017-03-1 2017-04- 2017-05- 2018-08- 2017-06- 2018-08- 2017-07- 2017-11- 2018-01- 2020-07- CUTIVOS E COMPLEMENTA IBRD / 82760 Post ification Selecti Open - National 90,000.00 106,151.48 Completed ublic Services 0 09 24 22 08 22 08 17 04 16 RES DE ENGENHARIA PARA on EXPANSAO REDE DE DADO S METROPOLITANA DA SES ED. ID90 CS / ELBORACAO DE Consultant Qual PROJETOS DE ENGENHARIA Component 1: Sustainable Open - Internatio 2017-04-2 2017-05- 2017-06- 2017-07- 2017-09- 2017-06- 2018-03- 2017-12- IBRD / 82760 Post ification Selecti 270,484.00 173,092.33 Completed DE OBRAS DE EDIFICACOE Regional Development nal 8 28 27 27 10 28 09 25 on S DO PARQUE TECNOLOGI CO ID92 CS / CONSULTORIA S OCIOAMBIENTAL PARA APO Consultant Qual IAR NO PLANEJAMENTO, AC Component 1: Sustainable 2017-04-0 2016-11- 2017-05- 2017-06- 2017-09- 2017-06- 2017-10- 2017-07- 2017-10- 2017-07- 2018-01- 2017-08- 2018-04- 2018-12- 2021-09- IBRD / 82760 Post ification Selecti Open - National 154,000.00 172,316.38 Completed OMPANHAMENTO E FISCALI Regional Development 7 14 07 06 01 16 02 01 10 31 24 30 19 03 30 on ZAÇÃO DE AÇÕES SOCIOA MBIENTAIS VOLTADOS PAR A OBRAS RODOVIÁRIAS 274181/2015-5 / ALFABETI ZAÇÃO DOS AGRICULTORE Consultant Qual Component 2: Improving P 2017-06-0 2014-07- 2017-06- 2017-08- 2018-09- 2017-09- 2018-08- 2017-10- 2018-10- 2018-10- S FAMILIARES COM QUALIFI IBRD / 82760 Post ification Selecti Open - National 300,000.00 192,521.03 Signed ublic Services 1 04 22 05 26 04 30 09 18 04 CAÇÃO SOCIAL E PROFISSI on ONAL SEGUINDO IDENTIFIC AÇÃO DAS CADEIAS PROD UTIVAS 331671/2016-X / Macrozo Quality And Cos Component 1: Sustainable Open - Internatio 2017-06-0 2017-06- 2017-08- 2017-09- 2017-10- 2017-06- 2017-11- 2017-11- 2017-12- 2018-08- 2018-12- neamento ecologico-econo IBRD / 82760 Prior t-Based Selectio 2,000,000.00 812,898.18 Signed Regional Development nal 2 23 06 03 03 12 07 01 12 23 12 mico da Bacia Hidrografica n do Piranhas-Acu. 331671/2016-2 / REALIZA CAO DO PROJETO MACROZ Quality And Cos Component 1: Sustainable 2017-06-0 2017-06- 2017-08- 2017-09- 2017-10- 2018-10- ONEAMENTO ECOLOGICO-E IBRD / 82760 Prior t-Based Selectio Open - National 2,000,000.00 0.00 Canceled Regional Development 1 22 05 04 09 04 CONOMICO DA BACIA HIDR n OGRAFICA DO PIRANHAS-A CU ID74 CS / APOIO AO MONI Quality And Cos TORAMENTO, CONTROLE, Component 3: Public Sect Open - Internatio 2017-03-1 2017-04- 2017-05- 2017-06- 2017-06- 2017-07- 2017-08- 2019-01- IBRD / 82760 Prior t-Based Selectio 3,714,285.71 0.00 Canceled SUPERVISAO, FISCALIZACA or Management nal 0 09 24 08 18 08 07 29 n O E GERENCIAMENTO DE O BRAS DE EDIFICACOES ID74 CS / APOIO AO MONI TORAMENTO, CONTROLE, Component 3: Public Sect Least Cost Sele Open - Internatio 2017-06-0 2017-06- 2017-07- 2017-07- 2017-08- 2017-08- 2017-06- 2017-09- 2017-07- 2019-03- IBRD / 82760 Prior 3,714,285.71 2,682,202.63 Signed SUPERVISÃO, FISCALIZAÇà or Management ction nal 5 20 15 25 04 24 16 24 16 18 O E GERENCIAMENTO DE O BRAS DE EDIFICAÇÕES 105677/2016-8 / MODERNI ZAÇÃO DA POLITICA DE RE Quality And Cos Component 3: Public Sect Open - Internatio 2017-08-2 2017-09- 2017-10- 2017-11- 2017-12- 2018-01- 2017-10- 2018-03- 2018-02- 2019-03- 2020-07- CURSOS HUMANOS DO EST IBRD / 82760 Prior t-Based Selectio 2,181,818.00 701,491.54 Completed or Management nal 2 12 26 23 23 27 24 03 15 03 16 ADO DO RN E CONTRATUA n LIZAÇÃO DA POLITICA DE R H DE SEGUNDO NÍVEL ID85CS / APOIO A SUPERVI Component 1: Sustainable Least Cost Sele Open - Internatio 2017-10-1 2017-11- 2017-12- 2017-10- 2018-01- 2018-01- 2018-02- 2018-02- 2018-03- 2018-03- 2018-04- 2018-04- 2019-10- SÃO, FISCALIZAÇÃO E GER IBRD / 82760 Prior 3,919,839.28 966,154.50 Signed Regional Development ction nal 7 07 15 30 12 27 11 12 18 28 22 18 14 ENCIAMENTO DE OBRAS D E ESTRADAS ID77 CS / DESENVOLVIME NTO DE SISTEMA DE MONI TORAMENTO AGROMETEO Quality And Cos Component 1: Sustainable 2017-10-1 2016-07- 2017-11- 2017-12- 2017-03- 2018-01- 2017-05- 2018-02- 2017-05- 2018-03- 2017-12- 2018-04- 2017-12- 2019-04- ROLÓGICO PARA ATENDER IBRD / 82760 Post t-Based Selectio Open - National 415,625.00 402,852.34 Signed Regional Development 9 29 09 23 28 20 04 19 26 26 20 30 28 30 O PROJETO AMPLIAÇÃO E M n ODERNIZAÇÃO HIDROMETE OROLÓGICO, CLIMÁTICO E AGROMETEOROLÓGICO DO RN ID85 CS / APOIO A SUPERV Component 1: Sustainable Least Cost Sele Open - Internatio 2017-03-0 2017-04- 2017-05- 2017-10- 2017-05- 2017-06- 2017-08- 2017-09- 2019-03- ISAO, FISCALIZACAO E GER IBRD / 82760 Prior 3,919,839.28 0.00 Canceled Regional Development ction nal 3 02 02 06 17 16 15 29 23 ENCIAMENTO DE OBRAS D E ESTRADAS ID101 CS / APLICATIVOS D Component 3: Public Sect Consultant Qual 2017-12-2 2017-08- 2018-01- 2018-03- 2017-12- 2018-03- 2018-04- 2018-05- 2018-04- 2018-11- 2020-07- IBRD / 82760 Post Open - National 218,750.00 80,977.34 Completed E COMPRAS DE SUBPROJET or Management ification Selecti 6 31 16 01 20 31 02 05 03 01 25 OS on ID97 CS / CONTRATAÇÃO Consultant Qual DE ESPECIALISTA EM HIDR Component 1: Sustainable 2018-03-2 2018-04- 2018-05- 2018-06- 2018-07- 2019-01- IBRD / 82760 Post ification Selecti Open - National 44,100.00 0.00 Canceled ÁULICA (PAINEL DE SEGUR Regional Development 0 10 24 23 28 24 on ANÇA DE BARRAGENS - PS B) ID96 CS / CONTRATAÇÃO Consultant Qual DE ESPECIALISTA EM HIDR Component 1: Sustainable 2018-03-2 2018-04- 2018-05- 2018-06- 2018-07- 2019-01- IBRD / 82760 Post ification Selecti Open - National 44,110.00 0.00 Canceled OLOGIA (PAINEL DE SEGUR Regional Development 0 10 24 23 28 24 on ANÇA DE BARRAGENS - PS B) ID95 CS / CONTRATAÇÃO Consultant Qual DE ESPECIALISTA EM GEOT Component 1: Sustainable 2018-03-2 2018-04- 2018-05- 2018-06- 2018-07- 2019-01- IBRD / 82760 Post ification Selecti Open - National 44,110.00 0.00 Canceled ECINICA (PAINEL DE SEGUR Regional Development 0 10 24 23 28 24 on ANÇA DE BARRAGENS - PS B) ID94 CS / CONTRATAÇÃO Consultant Qual DE ESPECIALISTA EM ESTR Component 1: Sustainable 2018-03-2 2018-04- 2018-04- 2018-05- 2018-06- 2018-07- 2019-01- IBRD / 82760 Post ification Selecti Open - National 44,110.00 0.00 Canceled UTURA DE MACIÇO (PAINEL Regional Development 0 11 10 24 23 28 24 on DE SEGURANÇA DE BARRA GENS -PSB) ID118 CS / CONSULTORIA Consultant Qual Component 3: Public Sect 2018-10-2 2018-11- 2018-12- 2019-01- 2019-03- 2019-08- ESPECIALIZADA EM ASSES IBRD / 82760 Post ification Selecti Open - National 265,625.00 0.00 Canceled or Management 4 14 28 27 03 30 SORAMENTO JURÍDICO IMO on BILIÁRIO ID104 CS / ELABORAÇÃO DE PROJETOS DE ENGENHA Component 1: Sustainable Least Cost Sele 2019-07-2 2019-06- 2019-08- 2019-09- 2019-09- 2019-10- 2019-10- 2019-11- 2019-10- 2019-12- 2020-02- 2020-02- 2019-11- 2020-07- IBRD / 82760 Post Open - National 118,750.00 41,565.58 Signed RIA PARA A RECUPERAÇÃO Regional Development ction 4 03 14 27 17 25 23 24 29 29 28 02 29 31 DOS POSTOS DE FISCALIZA ÇÃO ID105 CS-1 / PLANO ESTA Component 2: Improving P Consultant Qual 2019-07-2 2019-08- 2019-09- 2019-10- 2019-12- 2020-05- IBRD / 82760 Post Open - National 280,959.11 0.00 Canceled DUAL DE SEGURANÇA PÚB ublic Services ification Selecti 6 16 29 29 03 31 LICA on ID105 CS / PLANO ESTADU Component 2: Improving P Quality And Cos 2019-07-0 2019-07- 2019-09- 2019-10- 2019-11- 2019-12- 2020-01- 2021-01- IBRD / 82760 Post Open - National 320,000.00 0.00 Canceled AL DE SEGURANÇA PÚBLIC ublic Services t-Based Selectio 1 22 04 02 01 06 10 09 A n ID107 CS / CONTRATAÇÃO DE SERVIÇOS DE CONSULT Component 3: Public Sect Least Cost Sele 2020-03-0 2020-03- 2020-03- 2020-05- 2020-06- 2020-07- 2020-08- 2020-09- 2021-01- ORIA ESPECIALIZADA EM E IBRD / 82760 Post Open - National 161,436.35 0.00 Canceled or Management ction 2 09 23 06 03 03 07 11 09 NGENHARIA PARA APOIAR A UGP E O DER NA SUPERV ISÃO DE OBRAS RODOVIÁR IAS ID107 1 CS / CONTRATAÇà O DE SERVIÇOS DE CONSU LTORIA ESPECIALIZADA EM Consultant Qual Component 3: Public Sect 2020-03-1 2020-06- 2020-04- 2020-06- 2020-05- 2020-07- 2020-06- 2020-11- 2020-07- 2021-01- ENGENHARIA PARA APOIAR IBRD / 82760 Post ification Selecti Open - National 161,436.35 0.00 Canceled or Management 1 04 01 12 15 21 14 20 19 15 A UGP E O DER NA SUPERV on ISÃO DE OBRAS RODOVIÁR IAS DA ESTRADA DA PROD UÇÃO EM SÃO GONÇALO D O AMARANTE ID109 CS / MODERNIZAÇà O DO PROCESSO DE REGU LAÇÃO DOS EXAMES DE AL Component 2: Improving P Least Cost Sele 2020-12-1 2020-12- 2021-01- 2021-01- 2021-01- 2021-02- 2021-03- 2021-05- IBRD / 82760 Post Open - National 182,707.20 0.00 Canceled TA COMPLEXIDADE E DAS ublic Services ction 8 28 07 17 27 11 18 17 PORTAS DE URGÊNCIA E E MERGÊNCIA DO RIO GRAN DE DO NORTE ID107 2 CS / CONTRATAÇà O DE SERVIÇOS DE CONSU LTORIA ESPECIALIZADA EM ENGENHARIA PARA APOIAR Component 3: Public Sect Least Cost Sele Pending Imple 2020-12-1 2020-12- 2021-01- 2021-01- 2021-01- 2021-02- 2021-02- 2021-03- IBRD / 82760 Post Open - National 189,002.73 0.00 A UGP E O DER NA SUPERV or Management ction mentation 8 28 03 13 23 07 27 29 ISÃO DE OBRAS RODOVIÁR IAS DA ESTRADA DA PROD UÇÃO EM SÃO GONÇALO D O AMARANTE / EM SUBSTIT UIÇÃO AO ID107 1 CS. ID108 CS / CONTRATAÇÃO DE EMPRESA ESPECIALIZA DA PARA ELABORAÇÃO DE PROJETOS EXECUTIVOS DE ENGENHARIA PARA EXECU Component 2: Improving P Least Cost Sele 2020-09-0 2020-09- 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- IBRD / 82760 Prior Open - National 783,964.86 0.00 Canceled ÇÃO DE INTERVENÇÃO EM ublic Services ction 8 29 12 10 09 13 20 16 INSTALAÇÕES FÍSICAS EM ESTABELECIMENTOS ASSIS TENCIAIS DE SAÚDE - EAS, HOSPITAIS E UNIDADES DE REFERÊNCIA E DA REDE ES TADUAL DO RN. ID108 CS-1 / CONTRATAÇà O DE EMPRESA PARA ELAB ORAÇÃO DE PROJETOS EXE CUTIVOS DE ENGENHARIA Component 2: Improving P Least Cost Sele 2020-09-0 2021-03- 2020-09- 2020-11- 2020-12- 2021-01- 2021-02- 2021-03- 2021-09- PARA EXECUÇÃO DE INTER IBRD / 82760 Prior Open - National 783,964.86 0.00 Canceled ublic Services ction 8 31 29 12 10 09 13 20 16 VENÇÃO EM INSTALAÇÕES FÍSICAS EM ESTABELECIME NTOS ASSISTENCIAIS DE S AÚDE - EAS, HOSPITAIS E U NIDADES DE REFERÊNCIA E DA REDE ESTADUAL DO RN ID119 CS / APOIO A SUPER Component 1: Sustainable Consultant Qual 2021-10-0 2021-11- 2021-10- 2021-12- 2022-02- 2022-01- 2022-03- 2022-02- 2022-08- IBRD / 82760 Post Open - National 285,096.84 0.00 Signed VISÃO DE OBRAS RODOVIÁ Regional Development ification Selecti 5 16 26 09 15 08 15 12 11 RIA on ID121 CS / APOIO A SUPER Consultant Qual Component 1: Sustainable 2021-12-0 2021-12- 2022-02- 2022-03- 2022-04- 2022-10- VISÃO DAS OBRAS DE REC IBRD / 82760 Post ification Selecti Open - National 194,726.93 0.00 Canceled Regional Development 1 22 04 06 10 07 UPERAÇÃO DA BARRAGEM on DE LUCRÉCIA ID120 CS / MANUTENÇÃO Consultant Qual Component 1: Sustainable 2021-12-0 2022-04- 2021-12- 2022-02- 2022-05- 2022-03- 2022-07- 2022-04- 2022-10- 2023-01- PRO ATIVA DAS RODOVIAS IBRD / 82760 Post ification Selecti Open - National 250,000.00 0.00 Completed Regional Development 1 29 22 04 31 06 20 10 07 05 DA REGIÃO DE MOSSORÓ on ID123 CS / ELABORAÇÃO Consultant Qual DE PROJETOS EXECUTIVOS Component 1: Sustainable 2022-06-1 2022-07- 2022-07- 2022-07- 2022-07- 2022-08- 2022-09- 2022-09- 2022-12- IBRD / 82760 Post ification Selecti Open - National 298,568.74 0.00 Signed PARA IMPLANTAÇÃO E RES Regional Development 0 12 01 30 27 14 02 07 06 on TAURAÇÃO DE RODOVIAS DO DISTRITO III - A ID124 CS / ELABORAÇÃO Consultant Qual DE PROJETOS EXECUTIVOS Component 1: Sustainable 2022-06-1 2022-07- 2022-07- 2022-07- 2022-07- 2022-08- 2022-09- 2022-09- 2022-12- IBRD / 82760 Post ification Selecti Open - National 299,629.96 0.00 Signed PARA IMPLANTAÇÃO E RES Regional Development 0 12 01 30 27 14 19 07 06 on TAURAÇÃO DE RODOVIAS DO DISTRITO I - A ID125 CS / ELABORAÇÃO Consultant Qual DE PROJETOS EXECUTIVOS Component 1: Sustainable 2022-06-1 2022-07- 2022-07- 2022-07- 2022-07- 2022-08- 2022-09- 2022-09- 2022-12- IBRD / 82760 Post ification Selecti Open - National 190,185.20 0.00 Signed PARA IMPLANTAÇÃO E RES Regional Development 0 07 01 30 27 14 02 07 06 on TAURAÇÃO DE RODOVIAS DO DISTRITO I - B ID126 CS / ELABORAÇÃO Consultant Qual DE PROJETOS EXECUTIVOS Component 1: Sustainable 2022-06-1 2022-06- 2022-07- 2022-07- 2022-07- 2022-08- 2022-09- 2022-09- 2022-12- IBRD / 82760 Post ification Selecti Open - National 191,143.92 0.00 Signed PARA IMPLANTAÇÃO E RES Regional Development 0 30 01 30 27 14 02 07 06 on TAURAÇÃO DE RODOVIAS DO DISTRITO V ID127 CS / ELABORAÇÃO Consultant Qual DE PROJETOS EXECUTIVOS Component 1: Sustainable 2022-06-1 2022-06- 2022-07- 2022-07- 2022-07- 2022-08- 2022-09- 2022-09- 2022-12- IBRD / 82760 Post ification Selecti Open - National 192,016.17 0.00 Signed PARA IMPLANTAÇÃO E RES Regional Development 0 30 01 30 27 14 02 07 06 on TAURAÇÃO DE RODOVIAS DO DISTRITO VI ID128 CS / ELABORAÇÃO Consultant Qual DE PROJETOS EXECUTIVOS Component 1: Sustainable 2022-06-1 2022-07- 2022-07- 2022-07- 2022-07- 2022-08- 2022-09- 2022-09- 2022-12- IBRD / 82760 Post ification Selecti Open - National 212,523.73 0.00 Signed PARA IMPLANTAÇÃO E RES Regional Development 0 07 01 30 27 14 19 07 06 on TAURAÇÃO DE RODOVIAS DO DISTRITO II ID129 CS / ELABORAÇÃO Consultant Qual DE PROJETOS EXECUTIVOS Component 1: Sustainable 2022-06-1 2022-07- 2022-07- 2022-07- 2022-07- 2022-08- 2022-09- 2022-09- 2022-12- IBRD / 82760 Post ification Selecti Open - National 296,760.95 0.00 Signed PARA IMPLANTAÇÃO E RES Regional Development 0 12 01 30 27 14 02 07 06 on TAURAÇÃO DE RODOVIAS DO DISTRITO III - B ID 301 CS / ELABORAÇÃO Component 2: Improving P Consultant Qual Under Impleme 2023-03-3 2023-03- 2023-04- 2023-05- 2023-06- 2023-06- 2023-12- IBRD / 82760 Post Open - National 300,000.00 0.00 DE PROJETOS DO HOSPITA ublic Services ification Selecti ntation 0 29 20 19 03 27 24 L DE TRAUMA on SBQC - Processo No. 2679 Quality And Cos 95/2013-1 / Relatorio de Av Component 1: Sustainable Open - Internatio 2015-08- 2015-11- 2017-08- IBRD / 82760 Prior t-Based Selectio 512,406.00 512,406.00 Completed aliacao Tecnica - Plano Estr Regional Development nal 27 11 31 n ategico e de Marketing Turi stico RN SDP 39/2015 - ID 61 / Plan Quality And Cos Component 1: Sustainable Open - Internatio 2016-01- 2016-05- 2017-02- o Estrategico de Consolida IBRD / 82760 Prior t-Based Selectio 229,460.52 454,693.14 Completed Regional Development nal 13 03 03 cao dos Eixos Integrados d n e Desenvolvimento SDP 013/2014 / Elaboraca Quality And Cos Component 1: Sustainable Open - Internatio 2015-07- 2015-07- oo de projetos de edificaco IBRD / 82760 Prior t-Based Selectio 0.00 710,926.88 Terminated Regional Development nal 10 16 es e Urbanizacao - SEEC n SDP 44 - 01/2014 - TDR 01 Consultant Qual Component 1: Sustainable Open - Internatio 2014-05- 2014-05- 2014-11- 7/2013 / Mapeamento e Ca IBRD / 82760 Prior ification Selecti 200,000.00 185,165.92 Completed Regional Development nal 13 19 28 racterizacao das Organizac on oes Produtivas e Sociais SDP 011/2014 - ID 19 - Pol os Turisticos / Minuta do C Consultant Qual ontrato Negociado para Ela Component 1: Sustainable Open - Internatio 2015-08- 2015-09- IBRD / 82760 Prior ification Selecti 221,119.00 212,722.39 Signed bora o de Projeto Executivo Regional Development nal 07 01 on de Sinaliza o Tur stica para os Polos Tur sticos do Rio G rande do Norte - Serrano e Agreste/Trairi SBQC - SDP 04/2014 - ID 3 2 / Nao Objecao Minuta do Quality And Cos Contrato Negociado - Diag Component 1: Sustainable Open - Internatio 2015-06- 2015-06- 2016-12- IBRD / 82760 Prior t-Based Selectio 342,600.00 335,605.07 Completed nostico e Planejamento Est Regional Development nal 02 08 20 n rategico para o Desenvolvi mento de Atividades Produ tivas Agricolas 82/2016 / THE SUPPORT IN THE IMPLEMENTATION OF Component 1: Sustainable Least Cost Sele Open - Internatio 2016-04- 2016-07- 2016-10- 2016-11- 2016-12- 2016-09- 2017-02- 2016-09- 2020-07- AN INTEGRATED MONITORI IBRD / 82760 Prior 1,078,202.41 1,399,449.39 Completed Regional Development ction nal 08 07 05 04 19 08 17 21 21 NG SYSTEM AND THE INSTI TUTIONAL ASSESSMENT OF SEEC - SIMAIS Page 12 49/2014 / Elaborar o Plano Estrat gico de Desenvolvim Component 1: Sustainable Quality Based S Open - Internatio 2015-08- 2015-08- IBRD / 82760 Prior 2,239,851.00 2,145,785.29 Signed ento, Realinhamento Orga Regional Development election nal 17 04 nizacional e Moderniza o A dministrativa do Estado ID 01 - TDR 41 / Empresa Consultant Qual de Engenharia para Apoio Component 1: Sustainable Open - Internatio 2014-07- 2014-08- 2017-03- IBRD / 82760 Prior ification Selecti 300,000.00 293,695.70 Completed a UGP no Planejamento e A Regional Development nal 30 01 23 on companhamento das Obra s - TDR 41. ID 28 - TDR 16/2013 - SDP Component 1: Sustainable Quality And Cos Open - Internatio 2014-01- 2014-03- 2014-03- 2014-03- 2014-04- 2014-12- 2014-06- 2014-12- 2014-12- 2015-09- IBRD / 82760 Prior 699,221.00 330,165.01 Completed 002/2014 / Auditoria Folha Regional Development t-Based Selectio nal 17 03 23 28 22 02 21 09 18 09 de Pagamento n 20 - REPUBLICATION / SUP Quality And Cos Component 1: Sustainable Open - Internatio 2015-05- 2015-06- 2015-07- 2015-08- 2015-09- 2016-10- 2015-09- 2016-11- ORT SYSTEM TO THE MANA IBRD / 82760 Prior t-Based Selectio 2,871,064.00 2,378,598.02 Signed Regional Development nal 28 27 27 11 10 25 25 17 GEMENT RESULT n 05/2014 - ID 04 / Estudo d Quality And Cos e Viabilidade e Plano de Ne Component 1: Sustainable Open - Internatio 2016-01- 2016-02- IBRD / 82760 Prior t-Based Selectio 272,013.15 269,850.98 Signed gocios do 1 Parque Tecnolo Regional Development nal 12 23 n gico do Rio Grande do Nort e INDIVIDUAL CONSULTANTS Activity Reference No. Invitation to Identifi Loan / Credit Market Appro Contract Type Estimated A Actual Amou Process Stat Draft Negotiated C Contract Completio / Description Component Review Type Method Terms of Reference ed/Selected Consul Signed Contract No. ach mount (US$) nt (US$) us ontract n tant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ID17 CS / ELABORACAO D OS INSTRUMENTOS E MOD Component 3: Public Sect Individual Cons 2017-01-1 2017-01- 2017-02- 2017-09- 2017-03- 2017-09- 2018-03- ELOS DE GESTAO DOS SER IBRD / 82760 Post Direct 93,546.00 55,052.97 Signed or Management ultant Selection 8 18 17 11 19 11 14 VICOS DE ABASTECIMENTO DE AGUA IMPLANTADOS E M COMUNIDADES RURAIS ID82 CS / ELABORACAO D O PROJETO DE MOBILIARIO Component 2: Improving P 2017-04-0 2017-04- 2017-06- 2017-12- IBRD / 82760 Post Direct Selection Direct 137,142.86 0.00 Canceled SOB MEDIDA, SINALIZACAO ublic Services 7 12 26 23 , COMUNICACAO VISUAL E SONORIZACAO ID88 CS / ELABORACAO D Component 3: Public Sect Individual Cons 2016-12-2 2017-02- 2017-02- 2018-11- 2017-06- 2019-10- E PROJETOS DA REDE ELET IBRD / 82760 Post Limited 15,000.00 12,333.46 Completed or Management ultant Selection 0 03 18 23 18 08 RICA E REDE DE DADOS DA SEPLAN ID93 CS / ELABORAÇÃO D E PROJETOS DE ENGENHAR IA PARA ADEQUAÇÃO E AT Component 1: Sustainable 2017-05-3 2017-06- 2017-08- 2019-01- 2018-02- 2019-01- IBRD / 82760 Post Direct Selection Direct 110,000.00 86,026.59 Completed UALIZAÇÃO DE PROJETOS Regional Development 0 09 13 28 09 31 RODOVIÁRIOS DA ESTRAD A DA ACESSO SUL AEROPO RTO - BOA VISTA ID100 CS / ACOMPANHAM ENTO DO DESENVOLVIMEN Component 3: Public Sect Individual Cons 2018-01-0 2018-08- 2018-02- 2018-08- 2018-03- 2018-08- 2018-04- 2018-08- 2018-10- 2019-07- IBRD / 82760 Post Open 5,625.00 10,599.46 Completed TO DO APLICATIVO DE CO or Management ultant Selection 8 23 26 23 19 23 23 23 20 31 MPRAS DE SUBPROJETOS ID113 CS / CONTRATAÇÃO DE 02(DOIS) CONSULTORE Component 3: Public Sect Individual Cons 2018-04-1 2018-05- 2018-06- 2018-07- 2018-11- 2019-01- S INDIVIDUAIS DE ENGENH IBRD / 82760 Post Open 73,779.26 47,562.78 Signed or Management ultant Selection 2 31 21 26 13 22 ARIA CIVIL PARA ASSESSO RAMENTO DO PROJETO DE REGULARIZAÇÃO FUNDIÁRI A ID114 CS / CONTRATAÇÃO DE ESPECIALISTA EM DESE Component 3: Public Sect Individual Cons 2018-04-2 2018-06- 2018-07- 2019-02- 2018-08- 2018-12- 2019-02- IBRD / 82760 Post Open 43,700.94 30,847.18 Signed NHO E ACOMPANHAMENTO or Management ultant Selection 6 14 05 01 09 19 05 DE AVALIAÇÃO DE IMPACT O ID98 CS / CONSULTORIA I Component 3: Public Sect 2018-04-0 2018-04- 2018-06- 2018-07- 2018-12- 2019-05- IBRD / 82760 Post Direct Selection Direct 32,266.48 23,324.87 Completed NDIVIDUAL DE MODELAGE or Management 4 14 18 24 15 27 M FISCAL ID99 CS / CONSULTORIA I Component 3: Public Sect 2018-04-0 2018-04- 2018-06- 2018-07- 2018-12- 2019-05- NDIVIDUAL DE MODELAGE IBRD / 82760 Post Direct Selection Direct 34,767.16 47,775.79 Completed or Management 4 14 18 16 15 03 M DE FOLHA SALARIAL ID110 CS / CONSULTORIA I Component 3: Public Sect 2018-04-0 2018-04- 2018-06- 2018-06- 2018-12- NDIVIDUAL DE MODELAGE IBRD / 82760 Post Direct Selection Direct 21,989.38 8,589.68 Signed or Management 4 14 18 18 15 M DE PENSÕES PÚBLICAS ID111 CS / CONSULTORIA I Component 3: Public Sect 2018-04-0 2018-04- 2018-06- 2018-12- IBRD / 82760 Post Direct Selection Direct 33,000.00 0.00 Canceled NDIVIDUAL DE DIAGNÓSTI or Management 4 14 18 15 CO TRIBUTÁRIO ID112 CS / CONSULTORIA I Component 3: Public Sect 2018-04-0 2018-04- 2018-06- 2018-12- NDIVIDUAL DE DIAGNÓSTI IBRD / 82760 Post Direct Selection Direct 33,000.00 0.00 Canceled or Management 4 14 18 15 CO DAS COMPRAS PÚBLICA S ID115 CS / CONTRATAÇÃO DE ESPECIALISTA PARA EL ABORAÇÃO DO PROJETOS Component 2: Improving P Individual Cons 2018-05-1 2018-06- 2018-07- 2019-02- 2018-08- 2018-12- 2019-02- 2019-09- IBRD / 82760 Post Open 16,000.00 12,439.37 Completed DE MARCENARIA E SINALIZ ublic Services ultant Selection 0 28 19 07 23 28 19 18 AÇÃO PARA OS 07(SETE) H OSPITAIS REGIONAIS E LAB ORATÓRIO DE ANATOMIA. ID116 CS / CONTRATAÇÃO DE ESPECIALISTA PARA EL Component 2: Improving P Individual Cons 2018-05-1 2018-06- 2018-07- 2019-02- 2018-08- 2018-12- 2019-02- 2020-07- ABORAÇÃO DO PROJETO D IBRD / 82760 Post Open 16,000.00 13,243.81 Completed ublic Services ultant Selection 0 28 19 07 23 23 19 16 E MARCENARIA E SINALIZA ÇÃO PARA O HOSPITAL DA MULHER. ID117 CS / CONTRATAÇÃO DE ESPECIALISTA PARA EL ABORAÇÃO DO PROJETOS Component 2: Improving P Individual Cons 2018-05-1 2019-03- 2018-06- 2019-12- 2018-07- 2020-06- 2018-08- 2020-07- 2019-02- IBRD / 82760 Post Open 16,000.00 9,800.32 Signed DE SONORIZAÇÃO PARA 07 ublic Services ultant Selection 0 20 28 16 19 23 23 26 19 (SETE) HOSPITAIS REGION AIS, LABORATÓRIO DE ANA TOMIA E HOSPITAL DA MUL HER ID94 1CS / CONTRATAÇÃO DE ESPECIALISTA EM ESTR Component 1: Sustainable 2018-04-1 2018-08- 2018-04- 2018-08- 2018-06- 2018-12- IBRD / 82760 Prior Direct Selection Direct 78,125.00 0.00 Canceled UTURA DE MACIÇO (PAINEL Regional Development 1 03 21 22 25 22 DE SEGURANÇA DE BARRA GENS -PSB) ID95 2CS / CONTRATAÇÃO DE ESPECIALISTA EM GEOT Component 1: Sustainable 2018-11-2 2019-01- 2018-12- 2018-08- 2019-02- 2018-12- 2019-08- IBRD / 82760 Post Direct Selection Direct 78,125.00 63,578.69 Signed ECINICA (PAINEL DE SEGUR Regional Development 9 14 09 13 12 03 11 ANÇA DE BARRAGENS - PS B) ID94 2CS / CONTRATAÇÃO DE ESPECIALISTA EM ESTR Component 1: Sustainable 2018-11-2 2019-01- 2018-12- 2018-08- 2019-02- 2018-12- 2019-08- IBRD / 82760 Post Direct Selection Direct 78,125.00 59,637.14 Signed UTURA DE MACIÇO (PAINEL Regional Development 9 16 09 13 12 03 11 DE SEGURANÇA DE BARRA GENS -PSB) ID96 3 CS / CONTRATAÇà O DE ESPECIALISTA EM HID Component 1: Sustainable 2019-01-2 2019-01- 2019-02- 2019-01- 2019-04- 2019-05- 2020-04- IBRD / 82760 Post Direct Selection Direct 78,125.00 63,286.17 Signed ROLOGIA E HIDRÁULICA (P Regional Development 2 24 01 29 07 25 01 AINEL DE SEGURANÇA DE BARRAGENS - PSB) ID96 2 CS / CONTRATAÇà O DE ESPECIALISTA EM HID Component 1: Sustainable 2018-08-2 2018-09- 2018-09- 2018-11- 2019-10- IBRD / 82760 Prior Direct Selection Direct 78,125.00 0.00 Canceled ROLOGIA E HIDRÁULICA (P Regional Development 2 18 01 05 31 AINEL DE SEGURANÇA DE BARRAGENS - PSB) ID95 1CS / CONTRATAÇÃO DE ESPECIALISTA EM GEOT Component 1: Sustainable 2018-04-1 2018-08- 2018-04- 2018-08- 2018-06- 2018-12- IBRD / 82760 Prior Direct Selection Direct 78,125.00 0.00 Canceled ECINICA (PAINEL DE SEGUR Regional Development 1 03 21 22 25 22 ANÇA DE BARRAGENS - PS B) ID97 1CS / CONTRATAÇÃO DE ESPECIALISTA EM HIDR Component 1: Sustainable 2018-04-1 2018-04- 2018-06- 2018-12- IBRD / 82760 Prior Direct Selection Direct 78,125.00 0.00 Canceled ÁULICA (PAINEL DE SEGUR Regional Development 1 21 25 22 ANÇA DE BARRAGENS - PS B) ID96 1CS / CONTRATAÇÃO DE ESPECIALISTA EM HIDR Component 1: Sustainable 2018-04-1 2018-04- 2018-06- 2018-12- IBRD / 82760 Prior Direct Selection Direct 78,125.00 0.00 Canceled OLOGIA (PAINEL DE SEGUR Regional Development 1 21 25 22 ANÇA DE BARRAGENS - PS B) ID102 CS / CONTRATAÇÃO DE CONSULTORIA ESPECIA LISTA EM SEGURANÇA DE BARRAGENS (ÁREA DE EST RUTURA DE MACIÇO) - ANÁ Component 1: Sustainable 2019-03-1 2019-03- 2019-03- 2019-03- 2019-06- 2019-04- 2019-11- 2019-06- IBRD / 82760 Post Direct Selection Direct 15,625.00 7,837.49 Completed LISE DOS ESTUDOS E ELAB Regional Development 8 27 28 27 01 13 28 13 ORAÇÃO DO PROJETO EXE CUTIVO PARA RECUPERAÇ ÃO MANUTENÇÃO DA BARR AGEM PASSAGEM DAS TRAÍ RAS (CONTRATO Nº 009/20 18 SEMARH RN). ID103 CS / CONTRATAÇÃO DE CONSULTORIA ESPECIA LISTA EM SEGURANÇA DE BARRAGENS (ÁREA DE GE Component 1: Sustainable 2019-03-1 2019-03- 2019-03- 2019-03- 2019-06- 2019-04- 2019-11- 2019-06- OTECNIA) - ANÁLISE DOS E IBRD / 82760 Post Direct Selection Direct 15,625.00 7,788.96 Completed Regional Development 8 27 28 27 01 24 28 24 STUDOS E ELABORAÇÃO D O PROJETO EXECUTIVO PA RA RECUPERAÇÃO MANUTE NÇÃO DA BARRAGEM PASS AGEM DAS TRAÍRAS (CONT RATO Nº 009/2018 SEMAR H RN). CS / CONTRATAÇÃO ID106 DE SERVIÇO DE CONSULTO RIA PESSOA JURÍDICA PARA REALIZAÇÃO DE REVISÃO E Component 3: Public Sect 2019-08-2 2019-10- 2019-09- 2019-10- 2019-11- 2019-11- 2020-05- READEQUAÇÃO DE PROJET IBRD / 82760 Post Direct Selection Direct 279,515.33 207,109.69 Signed or Management 8 14 07 16 11 29 09 OS E SUPERVISÃO DA EXEC UÇÃO DAS OBRAS DE REC UPERAÇÃO DAS BARRAGE NS PATAXÓ E LUCRÉCIA N OS MUNICÍPIOS DE IPANG UAÇU/RN E LUCRÉCIA/RN ID 121 CS / CONTRATAÇà O DE CONSULTORIA ESPEC IALIZADA EM INOVAÇÃO TE CNOLÓGICA PARA AVALIAÇ Component 3: Public Sect 2020-03-0 2020-03- 2020-03- 2020-03- 2020-05- 2020-03- 2020-11- IBRD / 82760 Post Direct Selection Direct 16,540.00 16,540.00 Signed ÃO DA PROPOSTA DO PLAN or Management 2 09 12 06 16 21 12 O DE DESENVOLVIMENTO DO 1º PARQUE CIENTÍFICO E TECNOLÓGICO DO RIO G RANDE DO NORTE – PTCTR N ID130 CS / CONSULTORIA ESPECIALIZADA EM ENGEN HARIA CIVIL EM OBRAS DA Component 3: Public Sect Individual Cons 2021-07-1 2021-06- 2021-07- 2021-06- 2021-08- 2021-06- 2021-09- 2021-08- 2022-03- IBRD / 82760 Post Direct 75,347.94 72,324.63 Signed ÁREA DA SAÚDE PARA ACO or Management ultant Selection 2 18 22 08 12 23 16 03 15 MPANHAMENTO DA OBRA DE CONSTRUÇÃO DO HOSP ITAL DA MULHER EM MOSS ORÓ/RN ID121 CS-1 / APOIO A SUP Component 1: Sustainable 2021-12-1 2022-01- 2021-12- 2022-01- 2022-03- 2022-08- ERVISÃO DAS OBRAS DE R IBRD / 82760 Post Direct Selection Direct 194,726.93 0.00 Signed Regional Development 6 01 26 05 01 28 ECUPERAÇÃO DA BARRAGE M DE LUCRÉCIA ID122 CS / CONSULTORIA PARA PREPARAÇÃO DO REL Component 1: Sustainable 2022-05-2 2022-06- 2022-05- 2022-08- 2022-12- IBRD / 82760 Post Direct Selection Direct 500,000.00 0.00 Canceled ATÓRIO DE CONCLUSÃO D Regional Development 0 09 30 03 01 O ACORDO DE EMPRÉSTIM O 8276-BR (BCR) ID 201 CS / CONSULTORIA INDIVIDUAL ESPECIALISTA Component 1: Sustainable Individual Cons Under Impleme 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 16,615.00 0.00 EM PLANEJAMENTO, MONIT Regional Development ultant Selection ntation 1 05 19 10 14 11 ORAMENTO E AVALIAÇÃO DE PROJETOS ID 202 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons Under Impleme 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 12,462.00 0.00 A EM ACESSO MERCADOS: Regional Development ultant Selection ntation 1 05 19 10 14 31 COMERCIALIZAÇÃO - APICU LTURA ID 203 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons Under Impleme 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 12,462.00 0.00 A EM ACESSO A MERCADO Regional Development ultant Selection ntation 1 05 19 10 14 31 S: COMERCIALIZAÇÃO - LEI TES E DERIVADOS ID 204 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons Under Impleme 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- A EM ACESSO A MERCADO IBRD / 82760 Post Open - National 12,462.00 0.00 Regional Development ultant Selection ntation 1 05 19 10 14 31 S: COMERCIALIZAÇÃO - FR UTICULTURA / POLPA DE F RUTAS ID 205 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons Under Impleme 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 12,462.00 0.00 A EM ACESSO A MERCADO Regional Development ultant Selection ntation 1 05 19 10 14 31 S: COMERCIALIZAÇÃO - NÚ CLEO ESTADUAL ID 206 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons Under Impleme 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 12,462.00 0.00 A EM ACESSO A MERCADO Regional Development ultant Selection ntation 1 05 19 10 14 31 S: GESTÃO - APICULTURA ID 207 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 12,462.00 0.00 Under Review A EM ACESSO A MERCADO Regional Development ultant Selection 1 05 19 10 14 31 S: GESTÃO - LEITE E DERIV ADOS ID 208 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 12,462.00 0.00 Under Review A EM ACESSO A MERCADO Regional Development ultant Selection 1 15 19 10 14 31 S: GESTÃO - FRUTICULTUR A / POLPA DE FRUTAS ID 209 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 12,462.00 0.00 Under Review A EM ACESSO A MERCADO Regional Development ultant Selection 1 05 19 10 14 31 S: GESTÃO - NUCLEO ESTA DUAL ID 210 CS / CONSULTORIA INDIVIDUAL ESPECIALIZAD Component 1: Sustainable Individual Cons 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- IBRD / 82760 Post Open - National 12,462.00 0.00 Under Review A EM SISTEMATIZAÇÃO E E Regional Development ultant Selection 1 05 19 10 14 31 LABORAÇÃO DE PROJETOS ID 211 CS / CONSULTORIA Component 1: Sustainable Individual Cons Under Impleme 2023-03-0 2023-05- 2023-04- 2023-05- 2023-06- 2023-12- INDIVIDUAL ESPECIALIZAD IBRD / 82760 Post Open - National 24,923.00 0.00 Regional Development ultant Selection ntation 1 05 19 10 14 31 A EM ACESSO A MERCADO S E FEIRAS ID 302 CS / CONTRATAÇà Component 1: Sustainable 2023-03-1 2023-03- 2023-03- 2023-06- 2023-08- O DIRETA DE APOIO A SUP IBRD / 82760 Post Direct Selection Direct - National 95,156.00 0.00 Under Review Regional Development 9 29 29 02 31 ERVISÃO DA BARRAGEM D E LUCRÉCIA ID 303 CS / CONTRATAÇà Component 1: Sustainable 2023-03-1 2023-05- 2023-03- 2023-06- 2023-08- O DIRETA DE APOIO A SUP IBRD / 82760 Post Direct Selection Direct - National 44,285.00 0.00 Under Review Regional Development 9 09 29 02 31 ERVISÃO DA RN 233 ID 122 CS-1 / CONTRATAÇ ÃO DIRETA DA DIAGONAL/ Component 3: Public Sect 2022-08-2 2022-08- 2022-09- 2022-11- 2023-09- SETEC PARA PREPARAÇÃO IBRD / 82760 Post Direct Selection Direct - National 600,000.00 0.00 Under Review or Management 7 04 06 10 06 DO RELATÓRIO DE CONCL USÃO DO ACORDO DE EMP RÉSTIMO 8276-BR (BCR) IDF GRANT 01 - 2016 / Sel ecao e contratacao de serv icos de consultoria para oti Component 1: Sustainable 2015-07- IBRD / 82760 Prior Direct Selection Direct 143,782.24 140,592.55 Terminated mizacao de processos prior Regional Development 24 itarios da Secretaria de Est ado da Saude Publica do Ri o Grande do Norte (SESAP/ RN). Page 13 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan June 6, 2016 2. Date of General Procurement Notice: June 06, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year June 2016 to January 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 2,000,000 All 2. NCB (Goods) None None 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) None None 5. (Non-Consultant Services) None None 6. Direct Contract for goods Above 100,000 all 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not applicable July 9, 2010 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project issued on June 2016 by MPWT, RAMP II PMU 5. Any Other Special Procurement Arrangements: Not applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 54.1 4 No Prior of the ICB (Works) Summary 0.63 1 No Post of the ICB (Goods) Summary No No No No of the NCB (Works) Summary 0.155 4 No Post of the NCB (Goods) Summary No No No No of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1,000,000 2. Single Source (Firms) Above 100,000 3. Individual Above US$ 300,000 July 9, 2010 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.3 1 Prior of number of contracts that will be let under QCBS Summary 0.3 1 Post of number of contracts that will be let under QCBS Summary 0.03 1 Prior of number of contracts that will be let under CQS methods Summary 0.24 2 Prior of number of contracts July 9, 2010 that will be let under Individual Consultant selection Summary 0.094 4 Post of number of contracts that will be let under Individual Consultant selection July 9, 2010 PROCUREMENT Cambodia : KH - Road Asset Management Project II PLAN General Information Country: Cambodia 2016-06-30 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P150572 GPN Date: 2016-07-06 Project Name: KH - Road Asset Management Project II Loan / Credit No: IDA / 57890, IDA / 62790 Ministry of Public Works and Transport Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KH-MPWT-1-CW-RFB / Maint enance & strengthening of N Component A - Road Asset Open - Internationa Single Stage - One E 13,300,000.0 12,573,343. 2022-04-0 IDA / 57890 Prior Request for Bids Signed 2017-06-07 2017-06-13 2017-06-14 2017-06-21 2017-08-01 2017-08-08 2017-09-18 2018-01-08 2017-10-26 2018-02-05 R3 (PK147+100 to PK201+40 Management l nvelope 0 72 3 0), 54.3km length KH-MPWT-2-CW-RFB / Maint enance and Strengthening of Component A - Road Asset Open - Internationa Single Stage - One E 14,100,000.0 12,994,018. 2022-04-1 IDA / 57890 Prior Request for Bids Signed 2017-06-14 2017-06-27 2017-06-21 2017-06-28 2017-08-08 2017-08-15 2017-09-25 2017-11-28 2017-11-02 2017-12-28 NR7 (PK136+000 to PK186+ Management l nvelope 0 31 0 000), 50km length KH-MPWT-3-CW-RFB / Maint enance and Strengthening of Component A - Road Asset Open - Internationa Single Stage - One E 14,100,000.0 11,490,279. 2022-04-1 IDA / 57890 Prior Request for Bids Signed 2017-06-21 2017-07-10 2017-06-28 2017-07-12 2017-08-15 2017-08-29 2017-10-02 2017-12-19 2017-11-09 2018-02-05 NR7 (PK186+000 to PK243+ Management l nvelope 0 95 7 000), 57km length KH-MPWT-4-CW-RFB / Maint enance and Strengthening of Component A - Road Asset Open - Internationa Single Stage - One E 12,600,000.0 11,971,766. 2022-04-2 IDA / 57890 Prior Request for Bids Signed 2017-06-28 2017-07-17 2017-07-05 2017-07-17 2017-08-22 2017-09-05 2017-10-09 2017-11-30 2017-11-16 2017-12-31 NR7 (PK243+000 to PK300+ Management l nvelope 0 49 4 000), 57km length KH-MPWT-1-CW-RFB-AF / Mai ntenance and Strengthening Component A - Road Asset Open - Internationa Single Stage - One E 16,210,000.0 2026-12-1 IDA / 62790 Prior Request for Bids 0.00 Canceled 2019-08-15 2019-08-22 2019-10-09 2019-11-26 2019-12-17 of National Road No. 4 (PK19 Management l nvelope 0 5 +700 to PK60+000) KH-MPWT-3-CW-RFB-AF / Mai ntenance and Strengthening Component A - Road Asset Open - Internationa Single Stage - One E 12,108,545.9 9,878,483.1 2026-12-1 IDA / 62790 Prior Request for Bids Signed 2019-08-15 2020-04-23 2019-08-22 2020-04-29 2019-10-09 2020-08-05 2019-11-26 2021-02-07 2019-12-17 2021-03-30 of National Road No. 4 (PK10 Management l nvelope 4 2 5 1+000 to PK143+000) KH-MPWT-2-CW-RFB-AF / Mai Component A - Road Asset Open - Internationa Single Stage - One E 12,230,000.0 2027-03-0 ntenance and Strengthening IDA / 62790 Prior Request for Bids 0.00 Canceled 2019-11-01 2019-11-08 2019-12-26 2020-02-12 2020-03-04 Management l nvelope 0 3 of NR4 (PK60+000-PK101+000) KH-MPWT-4-CW-RFB-AF / Mai Component A - Road Asset Open - Internationa Single Stage - One E 12,980,000.0 2027-03-0 ntenance and Strengthening IDA / 62790 Prior Request for Bids 0.00 Canceled 2019-11-01 2019-11-08 2019-12-26 2020-02-12 2020-03-04 Management l nvelope 0 3 of NR4 (PK143+000-PK186+000) KH-MPWT-5-CW-RFB-AF / Mai Component A - Road Asset Open - Internationa Single Stage - One E 21,950,000.0 2027-03-0 ntenance and Strengthening IDA / 62790 Prior Request for Bids 0.00 Canceled 2019-11-01 2019-11-08 2019-12-26 2020-02-12 2020-03-04 Management l nvelope 0 3 of NR4 (PK186+000-PK226+466) KH-MPWT-1-AF-CW-RFB / Mai Component A - Road Asset Open - Internationa Single Stage - One E 20,309,000.0 19,861,540. 2027-06-3 ntenance and Strenghthenin IDA / 62790 Prior Request for Bids Signed 2020-02-28 2020-04-09 2020-03-06 2020-04-20 2020-04-23 2020-07-24 2020-06-10 2021-04-07 2020-07-01 2021-06-27 Management l nvelope 0 22 0 g of NR4 (PK19+700 to PK60 +000) KH-MPWT-2-AF-CW-RFB / Mai Component A - Road Asset Open - Internationa Single Stage - One E 11,021,000.0 9,529,281.6 2027-08-3 ntenance and Strengthening IDA / 62790 Prior Request for Bids Signed 2020-04-30 2020-06-12 2020-05-07 2020-09-04 2020-06-24 2020-11-20 2020-08-11 2021-04-12 2020-09-01 2021-06-26 Management l nvelope 0 9 1 of NR4 (PK60+000 to PK101 +000) KH-MPWT-4-AF-CW-RFB / Mai Component A - Road Asset Open - Internationa Single Stage - One E 11,453,000.0 9,698,571.8 2027-08-3 ntenance and Strengthening IDA / 62790 Prior Request for Bids Signed 2020-04-30 2020-06-12 2020-05-07 2020-09-04 2020-06-24 2020-11-30 2020-08-11 2022-02-15 2020-09-01 2022-05-31 Management l nvelope 0 7 1 of NR4 (PK143+000 to PK186 +000) KH-MPWT-5-AF-CW-RFB / Mai Component A - Road Asset Open - Internationa Single Stage - One E 17,126,000.0 2027-08-3 ntenance and Strengthening IDA / 62790 Prior Request for Bids 0.00 Canceled 2020-04-30 2020-06-22 2020-05-07 2020-06-24 2020-08-11 2020-09-01 Management l nvelope 0 1 of NR4 (PK186+000 to PK226 +466) KH-MPWT-5AF-CW-RFB-AF / Maintenance and Strengtheni Component A - Road Asset Open - Internationa Single Stage - One E 12,007,170.4 Under Imple 2028-06-1 IDA / 62790 Prior Request for Bids 0.00 2021-02-05 2021-02-12 2021-04-13 2021-05-31 2021-06-21 ng of National Road No4 (PK1 Management l nvelope 7 mentation 9 86+000~PK215+800) KH-MPWT-6-CW-RFB-AF (LOT 1) / Lot 1: Twenty-four (24) Component A - Road Asset Open - Internationa Single Stage - One E 10,437,774.8 2023-12-2 IDA / 62790 Prior Request for Bids 0.00 Signed 2021-02-19 2021-06-15 2021-02-26 2021-06-21 2021-04-12 2022-01-26 2021-06-11 2022-10-21 2021-07-09 Widening Bridges, Eight (8) B Management l nvelope 3 6 ox Culverts and 9 Pipe Culver ts KH-MPWT-7-CW-RFB-AF (LOT Component A - Road Asset Open - Internationa Single Stage - One E 12,404,225.4 2023-12-2 1) / Lot 1: Six (6) New Bridge IDA / 62790 Prior Request for Bids 0.00 Canceled 2021-02-19 2021-02-26 2021-04-12 2021-06-11 2021-07-09 Management l nvelope 5 6 s along National Road No.4 KH-MPWT-7-CW-RFB-AF (LOT 2) / Lot 2: Two (2) New Bridg Component A - Road Asset Open - Internationa Single Stage - One E 2023-12-2 IDA / 62790 Prior Request for Bids 7,102,325.22 0.00 Canceled 2021-02-19 2021-02-26 2021-04-12 2021-06-11 2021-07-09 es for Flooding Section along Management l nvelope 6 National Road No.4 KH-MPWT-6-CW-RFB-AF (LOT Component A - Road Asset Open - Internationa Single Stage - One E 2023-12-2 2) / Lot 2: Five (5) Replaceme IDA / 62790 Post Request for Bids 2,957,384.09 0.00 Signed 2021-02-19 2021-06-23 2021-02-26 2021-06-22 2021-04-12 2022-01-26 2021-06-11 2022-08-01 2021-07-09 Management l nvelope 6 nts of Superstructure and Wi dening KH-MPWT-5AF-CW-RFB / Mai Component A - Road Asset Open - Internationa Single Stage - One E Other (with field f 18,124,000.0 Under Imple 2028-10-0 ntenance and Strengthening IDA / 62790 Prior Request for Bids 0.00 2021-05-25 2021-06-01 2021-07-31 2021-09-17 2021-10-08 Management l nvelope or explanation) 0 mentation 6 of National Road 4 (PK186+0 00~PK215+800) Request for Bids - KH-MPWT-05-CW-RFB-AF / M Works – Roads (O aintenance and Strengthenin Component A - Road Asset Open - Internationa Single Stage - One E 15,000,000.0 14,530,971. 2029-04-1 IDA / 62790 Prior Request for Bids utput and Perform Signed 2021-07-01 2021-07-25 2021-07-08 2021-07-26 2021-09-06 2021-09-30 2022-03-05 2022-03-10 2022-04-16 2022-05-28 g of National Road 4 (PK186 Management l nvelope 0 42 4 ance Based Road +000~PK215+800) Contracts) SPD Page 1 KH-MPWT-7-CW-RFB-AF / Lot 1: Six (6) New Bridges alon Request for Bids - g National Road No.4 Component A - Road Asset Open - Internationa Single Stage - One E Works (without pr 19,500,000.0 2024-07-0 IDA / 62790 Prior Request for Bids 0.00 Signed 2021-07-25 2021-08-03 2021-08-01 2021-08-06 2021-09-30 2022-02-04 2021-11-29 2022-12-13 2022-01-03 Lot 2: Two (2) New Bridges Management l nvelope equalification) SP 0 3 for Flooding Section along Na D tional Road No.4 (LOT-2) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KH-MPWT-3-GO-RFQ / Accou Component B - System Upgr Request for Quota Single Stage - One E IDA / 57890 Post Limited 5,000.00 4,020.50 Signed 2017-05-26 2017-06-21 2017-07-07 2017-08-18 2017-08-04 nting Software ading and Capacity Develop tions nvelope ment KH-MPWT-2-GO-RFQ / Office Component B - System Upgr Request for Quota Single Stage - One E Pending Impl IDA / 57890 Post Limited 15,000.00 0.00 2017-10-13 2017-11-30 2018-01-29 furniture ading and Capacity Develop tions nvelope ementation ment KH-MPWT-1-GO-RFB / Supply Component B - System Upgr Single Stage - One E IDA / 57890 Post Request for Bids Open - National 120,000.00 107,600.00 Terminated 2017-08-11 2017-08-07 2017-08-16 2017-08-10 2017-09-15 2017-09-12 2017-10-15 2017-11-08 2017-11-08 2017-11-24 2018-01-19 and Delivery of Pick-up Truck ading and Capacity Develop nvelope s ment KH-MPWT-3-GO-DIR / Supply and Delivery of Two (2) KUAB Component B - System Upgr FWDs 150 and After-sale Ser IDA / 57890 ading and Capacity Develop Post Direct Selection Direct 580,000.00 588,657.77 Signed 2017-11-07 2017-11-22 2017-11-12 2017-11-23 2017-12-07 2018-02-26 2018-02-20 vices from KUAB KONSULT & ment UTVECKLING AB, Sweden KH-MPWT-4-GO-DIR / Supply Component B - System Upgr and Delivery of the ArcGIS U IDA / 57890 ading and Capacity Develop Post Direct Selection Direct 35,000.00 35,000.00 Signed 2017-11-07 2017-11-22 2017-11-12 2017-12-22 2017-11-27 2018-02-21 2017-12-25 pgrade Services for RDCMU f ment orm Aruna Technology Ltd. KH-MPWT-4-GO-RFQ / Supply Component B - System Upgr Request for Quota Single Stage - One E IDA / 57890 Post Open - National 100,000.00 88,026.00 Signed 2017-11-13 2017-11-23 2017-12-21 2018-02-05 2018-02-01 and Delivery for Two Pick-up ading and Capacity Develop tions nvelope Trucks ment KH-MPWT-6-GO-RFB / Road S Component B - System Upgr Open - Internationa Single Stage - One E urvey Equipment on a Vehicl IDA / 57890 ading and Capacity Develop Post Request for Bids 633,000.00 547,460.14 Signed 2017-11-08 2017-11-08 2017-11-22 2017-11-24 2018-01-03 2018-01-03 2018-01-23 2018-03-05 2018-02-02 2018-03-30 2018-04-03 l nvelope e, Software and Training ment KH-MPWT-RAMP-II-SP-1 / Sup Component B - System Upgr ply and Installation of Web A Request for Quota Single Stage - One E IDA / 57890 ading and Capacity Develop Post Open - National 35,000.00 48,543.00 Signed 2016-12-01 2017-01-16 2017-03-02 2017-03-02 pplication for Road Asset Ma tions nvelope ment nagement and a laptop comp uter KH-MPWT-1A-GO-RFB / Suppl Component B - System Upgr Single Stage - One E IDA / 57890 Post Request for Bids Open - National 120,000.00 107,600.00 Signed 2017-08-11 2017-08-07 2017-08-16 2017-09-15 2017-09-12 2017-10-15 2017-11-08 2017-11-08 2017-11-24 2018-01-19 y and Delivery of Pick-up Tru ading and Capacity Develop nvelope cks ment KH-MPWT-1-GO-RFQ-AF / Saf Component B - System Upgr Request for Quota Single Stage - One E IDA / 62790 Post Limited 5,000.00 4,964.00 Signed 2019-01-03 2018-12-19 2019-02-28 2019-02-20 2019-08-27 ety Sign FWD Operating ading and Capacity Develop tions nvelope ment KH-MPWT-2-GO-RFQ-AF / Ca Component B - System Upgr Request for Quota Single Stage - One E IDA / 62790 Post Limited 5,000.00 4,990.00 Signed 2019-01-03 2018-12-19 2019-02-28 2019-02-20 2019-08-27 binet and Tools for FWD Oper ading and Capacity Develop tions nvelope ating ment KH-MPWT-3-GO-RFQ-AF / Re Component B - System Upgr Request for Quota Single Stage - One E novation of Warehouse for F IDA / 62790 ading and Capacity Develop Post Limited 5,000.00 4,770.00 Signed 2019-01-03 2019-02-19 2019-02-28 2019-02-20 2019-08-27 tions nvelope WD Equipment Parking ment KH-MPWT-8-GO-RFB-AF / IT E Component B - System Upgr Single Stage - One E Under Imple IDA / 62790 Post Request for Bids Open - National 125,928.00 0.00 2019-12-02 2020-04-02 2019-12-07 2020-01-06 2020-05-19 2020-02-05 2020-02-29 2020-05-29 quipment Hardware and Soft ading and Capacity Develop nvelope mentation ware ment KH-MPWT-7-GO-RFB-AF / Tra Component B - System Upgr Single Stage - One E Under Imple IDA / 62790 Post Request for Bids Open - National 131,964.80 0.00 2019-12-02 2020-05-08 2019-12-07 2020-01-06 2020-06-30 2020-02-05 2020-02-29 2020-05-29 ffic Equipment ading and Capacity Develop nvelope mentation ment KH-MPWT-9-GO-RFQ-AF / Su Component B - System Upgr Request for Quota Single Stage - One E pply and installation of Video IDA / 57890 ading and Capacity Develop Post Open - National 89,100.00 8,800.00 Signed 2020-05-24 2020-05-20 2020-06-29 2020-08-01 2020-08-13 tions nvelope Conference and Laptops ment KH-MPWT-10-GO-RFB-AF / IT Component B - System Upgr Single Stage - One E Under Imple IDA / 62790 Post Request for Bids Open - National 125,928.00 0.00 2020-07-23 2020-10-12 2020-07-28 2020-10-13 2020-08-27 2020-09-26 2020-10-20 2021-01-18 Equipment Hardware and Sof ading and Capacity Develop nvelope mentation tware ment KH-MPWT-11-GO-RFB-AF / S Component B - System Upgr Single Stage - One E Under Imple upply and Delivery of Traffic IDA / 62790 ading and Capacity Develop Post Request for Bids Open - National 147,102.00 0.00 2020-09-23 2020-10-14 2020-09-28 2020-10-16 2020-10-28 2020-11-27 2020-12-16 2021-03-16 nvelope mentation Counter and Analyzer Equip ment ment KH-MPWT-14-GO-RFB / Suppl Component B - System Upgr Single Stage - One E Under Imple IDA / 57890 Post Request for Bids Open - National 117,000.00 0.00 2021-06-04 2021-07-13 2021-06-09 2021-07-13 2021-07-09 2021-08-13 2021-08-08 2021-09-01 2021-11-30 y and Installation of IT Equip ading and Capacity Develop nvelope mentation ment ment KH-MPWT-13-GO-RFB / Suppl Component B - System Upgr Single Stage - One E Pending Impl y and Installation of Traffic C IDA / 57890 ading and Capacity Develop Post Request for Bids Open - National 150,000.00 0.00 2021-09-15 2021-09-20 2021-10-20 2021-11-19 2021-12-13 2022-03-13 nvelope ementation ounting Equipment ment KH-MPWT-15-GO-RFB / ArcGI Component B - System Upgr Single Stage - One E Under Imple IDA / 57890 Post Request for Bids Open - National 150,000.00 0.00 2021-06-21 2021-08-03 2021-06-26 2021-08-03 2021-07-26 2021-08-25 2021-09-18 2021-12-17 S Server and Desktop Licens ading and Capacity Develop nvelope mentation e ment KH-MPWT-G6-GO-RFB / Supp Component B - System Upgr Request for Quota Single Stage - One E Pending Impl IDA / 57890 Post Open - National 25,000.00 0.00 2021-12-07 2022-01-25 2022-04-25 ly and Installation of Furnitur ading and Capacity Develop tions nvelope ementation e ment KH-MPWT-G16-GO-DIR / 1 Se mi Wagon Vehicle from UNO Component B - System Upgr Under Imple PS (The proposed cost estim IDA / 57890 ading and Capacity Develop Post Direct Selection Direct 45,000.00 0.00 2021-09-08 2021-09-21 2021-09-22 2021-12-15 2021-10-14 2022-04-12 mentation ated is include the Manufactu ment ring cost, UNOPS fee, and fre ight. KH-MPWT-15-GO-RFB-1 / Arc Component B - System Upgr Single Stage - One E Under Imple IDA / 57890 Post Request for Bids Open - National 240,000.00 0.00 2022-02-08 2022-03-18 2022-02-13 2022-04-24 2022-03-27 2022-04-04 2022-04-26 2022-05-31 2022-11-27 GIS Server and Desktop Lice ading and Capacity Develop nvelope mentation nse ment KH-MPWT-2-GO-RFB / 4 pick- Component B - System Upgr Single Stage - One E IDA / 57890 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2017-02-01 2017-02-13 2017-02-07 2017-02-21 2017-03-27 2017-03-07 2017-03-20 2017-05-19 ups ading and Capacity Develop nvelope ment KH-MPWT-1-GO-DIR / Electro Component B - System Upgr nic Parts IDA / 57890 ading and Capacity Develop Post Direct Selection Direct 50,000.00 52,009.18 Signed 2016-12-20 2016-10-22 2016-12-27 2017-01-11 2017-01-17 2017-09-12 2017-04-17 (Hardware Upgrading ) ment Page 2 KH-MPWT-2-GO-DIR / RDCM Component B - System Upgr U Software and Hardware Up IDA / 57890 ading and Capacity Develop Prior Direct Selection Direct 100,000.00 0.00 Canceled 2017-03-01 2017-03-24 2017-03-15 2017-04-14 2017-06-13 grade and Training ment KH-MPWT-1-GO-RFQ / Supply Component B - System Upgr and installation of Web Appli Single Stage - One E IDA / 57890 ading and Capacity Develop Post Request for Bids Open - National 35,000.00 0.00 Terminated 2016-11-28 2016-11-28 2016-12-01 2016-12-15 2016-12-21 2017-01-17 2016-12-28 2017-01-27 2017-01-16 2017-03-02 2017-03-02 cation for Road Asset Manag nvelope ment ement and a laptop compute r KH-MPWT-4-GO-RFB / Two su rvey vehicles with survey Component B - System Upgr Open - Internationa Single Stage - One E equipment: Two FWDs, IDA / 57890 ading and Capacity Develop Post Request for Bids 630,000.00 0.00 Canceled 2017-01-12 2017-02-27 2017-01-26 2017-04-25 2017-02-23 2017-06-08 2017-03-09 2017-03-23 2017-09-19 l nvelope Two sets of survey equipmen ment t (GPS, IRI laser, Video record, TPL) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KH-MPWT-1-CS-QCBS-AF / W Component B - System Upgr Quality And Cost- Open - Internationa orks Supervision, RAMP-IIAF IDA / 62790 ading and Capacity Develop Prior 5,013,090.04 5,693,901.00 Signed 2018-12-28 2018-12-21 2019-01-07 2019-11-03 2019-03-17 2020-10-08 2019-05-01 2020-11-24 2019-06-09 2021-04-26 2019-07-15 2021-09-14 2019-08-12 2021-10-22 2026-08-11 Based Selection l NR4 All Works Packages ment KH-MPWT-2-NGO-CQS-AF / C Component B - System Upgr ommunity Based Road Safety Consultant Qualifi IDA / 57890 ading and Capacity Develop Prior Open - National 300,000.00 0.00 Canceled 2021-01-27 2021-03-31 2021-02-03 2021-04-04 2021-04-18 2021-05-02 2023-05-02 Program for National Road 4 cation Selection ment (PK19+700 to PK215+900) KH-MPWT-3-CS-CQS-AF / Roa d Data Collection Manageme Component A - Road Asset Consultant Qualifi Open - Internationa IDA / 62790 Post 300,000.00 0.00 Canceled 2022-04-20 2022-04-20 2022-05-11 2022-06-24 2022-07-24 2022-08-28 2023-02-24 nt Unit Software and Hardwa Management cation Selection l re Upgrade and Training KH-MPWT-4-CS-QCBS-RA-1 / Component B - System Upgr Road Data Collection Manage Quality And Cost- Open - Internationa Under Implement IDA / 62790 ading and Capacity Develop Post 500,000.00 0.00 2022-08-23 2022-09-01 2022-09-13 2022-10-27 2022-11-24 2022-12-24 2023-01-28 2023-03-04 2024-03-03 ment Unit Software and Hard Based Selection l ation ment ware Upgrade and Training KH-MPWT-2-NGO-CQS-AF-2 / Consulting Services for Com Component B - System Upgr Consultant Qualifi munity Based Road Safety Pr IDA / 57890 ading and Capacity Develop Post Open - National 300,000.00 0.00 Canceled 2021-04-08 2021-04-07 2021-04-15 2021-05-06 2021-06-14 2022-07-18 2021-06-28 2021-07-12 2023-07-12 cation Selection ogram for Maintaining and St ment rengthening of National Road 4 KH-MPWT-2-NGO-CQS-AF-3 / Community Based Road Safe Component A - Road Asset Consultant Qualifi Under Implement IDA / 62790 Post Open - National 300,000.00 0.00 2023-05-31 2023-05-23 2023-06-21 2023-08-04 2023-09-03 2023-10-08 2024-04-05 ty Program (CBRSP) for Natio Management cation Selection ation nal Road 4 (PK19+700 to PK2 15+800) KH-MPWT-1-CS-NPO / Comm Component B - System Upgr Non-Profit Organiz unity Based Road Safety IDA / 57890 ading and Capacity Develop Post Open - National 300,000.00 274,990.00 Signed 2016-11-25 2016-12-06 2016-12-29 2017-01-17 2017-02-11 2017-07-26 2017-03-13 2018-02-16 2017-04-17 2018-03-01 2022-12-31 ations Program ment KH-MPWT-1-CS-QCBS / Imple Component A - Road Asset Quality And Cost- Open - Internationa mentation Support & Works IDA / 57890 Prior 4,300,000.00 6,033,139.79 Signed 2016-12-01 2016-12-16 2016-12-16 2016-12-22 2017-02-03 2017-07-31 2017-04-12 2017-09-06 2017-06-01 2018-03-11 2017-07-07 2018-05-23 2017-08-30 2018-05-28 2022-03-10 Management Based Selection l Supervision, ISWS, Consultan t Firm KH-MPWT-1-CS-CQS / Financi Component B - System Upgr Consultant Qualifi IDA / 57890 Prior Open - National 30,000.00 0.00 Canceled 2017-01-03 2017-01-12 2017-01-25 2017-02-01 2017-02-15 2022-12-31 al Audit ading and Capacity Develop cation Selection ment INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KH-MPWT-6-CS-INDV / Social Component B - System Upgr Individual Consult IDA / 57890 Post Open 12,000.00 41,855.00 Signed 2017-05-31 2017-06-15 2017-08-18 2017-08-16 2017-08-21 2017-09-07 2017-09-09 2017-10-31 2022-04-24 Safeguard Consultant ading and Capacity Develop ant Selection ment KH-MPWT-7-CS-INDV / Prepa Component B - System Upgr Individual Consult ration of Environmental Man IDA / 57890 ading and Capacity Develop Post Open 15,000.00 8,235.29 Signed 2017-12-01 2017-12-13 2018-01-19 2018-01-23 2018-02-09 2018-01-25 2018-03-09 2018-02-09 2018-04-23 ant Selection agement Plan ment KH-MPWT-8-CS-INDV / Prepa Component B - System Upgr Individual Consult IDA / 57890 Post Open 15,000.00 9,923.29 Signed 2017-12-05 2017-12-13 2018-02-08 2018-01-26 2018-02-15 2018-02-01 2018-03-08 2018-02-02 2018-04-22 ration of Resettlement Action ading and Capacity Develop ant Selection Plan ment KH-MPWT-5-CS-INDV / Enviro Component B - System Upgr Individual Consult IDA / 57890 Post Open 12,000.00 0.00 Canceled 2017-05-31 2017-06-15 2017-08-18 2017-08-16 2017-08-21 2017-09-04 2022-04-24 nmental Supervision Consult ading and Capacity Develop ant Selection ant ment KH-MPWT-9-CS-INDV / Enviro Component B - System Upgr Individual Consult nmental Supervision Consult IDA / 57890 ading and Capacity Develop Post Limited 60,000.00 43,200.00 Signed 2017-11-24 2017-11-24 2017-11-29 2017-11-27 2017-12-04 2018-02-01 2017-12-14 2018-02-14 2022-05-22 ant Selection ant - 3 CV Method ment KH-MPWT-1-CS-SSS / Mr. Jen Component B - System Upgr s Christian Helbech Hede (Ex Individual Consult IDA / 57890 ading and Capacity Develop Post Direct 15,966.28 15,966.28 Signed 2017-12-04 2017-12-08 2018-04-13 2018-05-25 2018-04-13 2018-05-25 2018-05-31 pert of Asset Management In ant Selection ment formation System) KH-MPWT-2-CS-SSS / Mr. Oli Component B - System Upgr Individual Consult vier de Peyrelongue (IT Speci IDA / 57890 ading and Capacity Develop Post Direct 5,453.49 5,254.68 Signed 2017-12-04 2017-12-08 2018-04-02 2018-04-30 2018-04-13 2018-04-30 2018-05-31 ant Selection alist - Asset Management Inf ment ormation System) KH-MPWT-10-CS-INDV / Road Component B - System Upgr Individual Consult IDA / 57890 Post Limited 13,500.00 20,445.88 Signed 2018-07-20 2018-08-01 2018-08-02 2018-08-02 2018-09-20 2018-10-01 2018-10-01 2018-10-16 2019-01-01 Hydrology Expert ading and Capacity Develop ant Selection ment KH-MPWT-11-CS-INDV / Road Component B - System Upgr Individual Consult IDA / 57890 Post Limited 27,000.00 26,458.83 Signed 2018-10-12 2018-12-13 2018-10-17 2018-12-13 2018-11-07 2019-07-01 2018-11-17 2019-07-17 2026-06-22 Safety Audit Specialist ading and Capacity Develop ant Selection ment Page 3 KH-MPWT-12-CS-INDV-AF / N Component B - System Upgr Individual Consult IDA / 62790 Post Open 72,000.00 0.00 Canceled 2018-12-05 2018-12-13 2019-01-23 2019-03-28 2019-01-26 2019-01-31 2020-01-31 ational Procurement Expert R ading and Capacity Develop ant Selection AMP-IIAF ment KH-MPWT-13-CS-INDV-AF / N Component B - System Upgr Individual Consult IDA / 62790 Post Open 11,550.00 13,220.00 Signed 2019-03-19 2019-03-18 2019-04-11 2019-08-30 2019-04-13 2019-09-13 2019-04-16 2019-09-13 2019-10-13 ational Social Consultant ading and Capacity Develop ant Selection ment KH-MPWT-14-CS-INDV-AF / N Component B - System Upgr Individual Consult ational Environment and Soci IDA / 62790 ading and Capacity Develop Post Open 11,550.00 13,220.00 Signed 2019-03-19 2019-03-18 2019-04-11 2019-08-30 2019-04-13 2019-09-13 2019-04-16 2019-09-13 2019-10-13 ant Selection al Consultant ment KH-MPWT-15-CS-INDV-AF / In Component B - System Upgr Individual Consult ternational Environmental an IDA / 62790 ading and Capacity Develop Post Open 41,580.00 34,779.30 Signed 2019-03-19 2019-03-18 2019-04-11 2019-07-22 2019-04-13 2019-07-22 2019-04-16 2019-08-15 2019-10-13 ant Selection d Social Consultant ment KH-MPWT-16-CS-INDV-AF / In Component B - System Upgr Individual Consult IDA / 62790 Post Open 41,580.00 41,572.40 Signed 2019-03-19 2019-03-18 2019-04-11 2019-06-28 2019-04-13 2019-07-22 2019-04-16 2019-08-26 2019-10-13 ternational Social Consultant ading and Capacity Develop ant Selection ment KH-MPWT-19-CS-INDV-AF / In Component B - System Upgr Individual Consult IDA / 57890 Post Open - National 224,235.00 208,600.40 Signed 2019-10-16 2019-10-16 2019-11-15 2019-12-18 2019-11-22 2019-12-26 2019-12-06 2020-02-07 2020-12-05 ternational Procurement Exp ading and Capacity Develop ant Selection ert ment KH-MPWT-17-CS-INDV-AF / N Component B - System Upgr Individual Consult Under Implement ational Procurement Expert – IDA / 62790 ading and Capacity Develop Post Open 36,000.00 0.00 2019-11-07 2019-11-08 2019-12-26 2019-12-29 2020-01-03 2021-01-02 ant Selection ation AF (NPE-AF) ment KH-MPWT-18-CS-INDV-AF / P Component B - System Upgr Individual Consult IDA / 62790 Post Open 24,000.00 5,752.80 Signed 2019-11-07 2019-11-08 2019-12-26 2020-02-25 2019-12-29 2020-02-28 2020-01-03 2020-03-28 2021-01-02 rocurement Assistant – AF (P ading and Capacity Develop ant Selection A-AF) ment KH-MPWT-20-CS-INDV / Traff Component B - System Upgr Individual Consult Under Implement IDA / 57890 Post Open 50,000.00 0.00 2021-06-08 2021-06-02 2021-07-27 2021-08-10 2021-08-24 2021-10-23 ic Counting Specialist ading and Capacity Develop ant Selection ation ment KH-MPWT-TA1-CS-INDV / Int Component B - System Upgr Individual Consult Pending Impleme IDA / 57890 Post Open 80,000.00 0.00 2021-09-30 2021-12-10 2021-12-17 2022-01-05 2023-12-26 ernational Technical Audit for ading and Capacity Develop ant Selection ntation RAMP-II ment KH-MPWT-C18-CS-INDV / Co Component B - System Upgr Individual Consult Pending Impleme IDA / 57890 Post Open - National 200,000.00 0.00 2021-07-15 2021-09-27 2021-10-04 2021-10-25 2028-09-18 ntract Management Adviser ading and Capacity Develop ant Selection ntation ment KH-MPWT-TA2-CS-INDV / Int Component B - System Upgr Individual Consult IDA / 57890 Post Open 80,000.00 0.00 Canceled 2021-09-30 2021-07-13 2021-12-10 2022-05-11 2021-12-17 2022-01-05 2023-12-26 ernational Technical Audit for ading and Capacity Develop ant Selection RAMP-IIAF ment KH-MPWT-TA3-CS-INDV-AF / Component A - Road Asset Individual Consult Under Implement International Technical Audit IDA / 57890 Post Open 80,000.00 0.00 2022-06-22 2022-08-04 2022-08-10 2022-08-31 2022-10-05 2023-04-03 Management ant Selection ation for RAMP-IIAF KH-MPWT-4-CS-INDV / Local Component B - System Upgr Individual Consult IDA / 57890 Post Open 20,000.00 24,035.00 Signed 2017-01-02 2017-01-17 2017-02-20 2017-06-30 2017-03-06 2017-07-12 2017-03-20 2017-08-08 2018-12-31 FM consultant ading and Capacity Develop ant Selection ment KH-MPWT-001-CS-INDV / Int Component B - System Upgr Individual Consult IDA / 57890 Prior Open - National 180,000.00 476,521.77 Signed 2016-06-30 2016-06-30 2016-10-04 2016-10-03 2016-10-25 2016-10-28 2016-09-01 2016-11-01 2017-09-01 ernational Procurement Expe ading and Capacity Develop ant Selection rt ment KH-MPWT-002-CS-INDV / Nat Component B - System Upgr Individual Consult IDA / 57890 Prior Open - National 24,000.00 33,327.00 Signed 2016-06-30 2016-06-30 2016-08-02 2016-11-11 2016-08-23 2016-11-22 2016-09-01 2016-11-23 2017-09-01 ional Procuremnt Expert Con ading and Capacity Develop ant Selection sultant ment KH-MPWT-3-CS-INDV / Techn Component B - System Upgr Individual Consult Pending Impleme IDA / 57890 Post Open 50,000.00 0.00 2018-06-01 2018-07-20 2018-07-25 2018-08-01 2022-07-29 ical Audit ading and Capacity Develop ant Selection ntation ment Page 4 PLAN DE PASSATION DE MARCHÉS (Texte) Information sur le Projet : Projet de Gestion Economique et de Développement Statistique pour la Prise de Décision (P171777) Agence d’exécution du Projet : Ministère de l’économie et des Finances, chargé de l’industrie (MEFI) Date du plan de passation des marchés : 8 octobre 2020 Période couverte par ce plan de passation des marchés : Octobre 2020 – Janvier 2021 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016, révisé en Novembre 2107 et Août 2018) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marché se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans la Loi n°53/AN/09/6ème L portant Nouveau Code des Marchés Publics, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas/ Travaux ne s’applique pas/ PROCUREMENT Djibouti : Economic Management and Statistics Development for Policy Making PLAN General Information Country: Djibouti 2020-10-19 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171777 GPN Date: Project Name: Economic Management and Statistics Development for Policy Making Loan / Credit No: IDA / 66720 Ministry of Economy and Finances, in charge of Industry Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned DJ-MOH-210009-CW-RFQ / Tr Request for Quota Single Stage - One E 2021-04-0 avaux de réhabilitation des b IDA / 66720 Project Management Post Limited 30,000.00 1,404.30 Signed 2020-12-28 2021-10-13 2021-02-22 2021-12-20 tions nvelope 8 ureaux de l'Unité de Gestion du Projet. DJ-MOH-290994-CW-RFQ / A Modernizing the Recipient's ménagement de la salle de r Request for Quota selected economic and fiscal Request for Quota Single Stage - One E 2022-08-2 éunion de la Direction de la IDA / 66720 Post Limited tions (Non Bank-S 25,000.00 13,383.08 Signed 2022-05-30 2020-12-14 2022-07-09 2020-12-21 management tools and proc tions nvelope 3 Dette Publique et raccordem PD) esses ent au groupe électrogène. Strengthening the capacity DJ-MOH-361603-CW-RFQ / A of the National Institute of St cquisition et installation d'un Request for Quota Single Stage - One E Other (with field f Pending Imp 2024-01-2 IDA / 66720 atistics of Djibouti (INSD) to Post Limited 22,000.00 0.00 2023-06-04 2023-07-30 e salle préfabriquer pour loge tions nvelope or explanation) lementation 6 produce and disseminate ti r le serveur du RGPH mely an d reliable statistics i n a sustainable manner GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-MOH-204768-GO-RFQ / Ac Modernizing the Recipient's Request for Quota Single Stage - One E hat de Véhicules et assuranc IDA / 66720 selected economic and fiscal Post Open - National 120,000.00 0.00 Canceled 2021-01-05 2021-03-02 2021-08-29 tions nvelope es management tools and proc esses DJ-MOH-218463-GO-RFQ / Ac Request for Quota Single Stage - One E Under Imple quisition de mobiliers de bur IDA / 66720 Project Management Post Limited 25,000.00 0.00 2021-02-20 2021-02-21 2021-04-03 2021-05-03 tions nvelope mentation eaux pour l'UGP. DJ-MOH-218464-GO-RFQ / Ac Request for Quota Single Stage - One E Pending Impl quisition de matériels inform IDA / 66720 Project Management Post Limited 25,000.00 0.00 2021-02-20 2021-04-03 2021-05-03 tions nvelope ementation atiques pour l'UGP. Strengthening the capacity of the National Institute of St DJ-MOH-220106-GO-RFB / Ac Single Stage - One E IDA / 66720 atistics of Djibouti (INSD) to Post Request for Bids Open - National 120,000.00 191,641.86 Signed 2021-02-28 2021-05-26 2021-03-05 2022-02-22 2021-04-04 2021-05-19 2021-04-18 2021-10-13 2021-05-16 2022-04-13 2021-06-15 hat de véhicules. nvelope produce and disseminate ti mely an d reliable statistics i n a sustainable manner DJ-MOH-231369-GO-RFB / Ac quisition de matériels inform Modernizing the Recipient's atiques pour la Direction de l' selected economic and fiscal Single Stage - One E IDA / 66720 Post Request for Bids Open - National 55,000.00 77,601.48 Signed 2021-05-09 2021-06-03 2021-05-14 2021-07-13 2021-06-13 2021-08-11 2021-07-04 2021-11-17 2021-08-01 2022-04-13 2021-08-31 Economie et du Plan (DEP) et management tools and proc nvelope la Direction de la Dette Publi esses que (DDP) dans le cadre du p rojet GEDES. DJ-MOH-227227-GO-RFB / Ac Modernizing the Recipient's Request for Quota Single Stage - One E Under Imple quisition d'un serveur pour la IDA / 66720 selected economic and fiscal Post Limited 10,000.00 0.00 2021-04-09 2021-05-21 2021-06-20 tions nvelope mentation Direction de la Dette Publiqu management tools and proc e (DDP). esses DJ-MOH-238903-GO-DIR / Ac quisition d'un logiciel de com IDA / 66720 Project Management Post Direct Selection Direct 15,000.00 27,500.00 Signed 2021-06-13 2021-06-15 2021-06-20 2021-08-19 2021-08-01 2021-11-09 2022-08-01 ptabilité (SUCCESS) pour le P rojet. DJ-MOH-240753-GO-RFQ / Ac quisition de Fournitures (ram Request for Quota Single Stage - One E Under Imple e de papiers, cartouche, encr IDA / 66720 Project Management Post Limited 25,000.00 0.00 2021-07-17 2021-09-11 2022-09-11 tions nvelope mentation es d'imprimantes, etc.) pour l a coordination du Projet. DJ-MOH-252442-GO-DIR / Ac Strengthening the capacity quisition d'ordinateurs portab of the National Institute of St les pour la formation de la pr atistics of Djibouti (INSD) to Pending Impl emière cohorte de vingt (20) IDA / 66720 Post Direct Selection Direct 25,000.00 0.00 2021-09-08 2021-09-09 2021-09-19 2021-09-24 produce and disseminate ti ementation ingénieurs des travaux statis mely an d reliable statistics i tiques (ITS) et analystes stati n a sustainable manner sticiens (AS) de l'INSTAD à l'E NSEA de Dakar (Sénégal) . Strengthening the capacity DJ-MOH-290534-GO-RFQ / Ac of the National Institute of St hat de fournitures de bureau Request for Quota Single Stage - One E Pending Impl IDA / 66720 atistics of Djibouti (INSD) to Post Limited 13,050.00 0.00 2022-05-04 2022-06-13 2022-07-13 pour le fonctionnement du B tions nvelope ementation produce and disseminate ti CR. mely an d reliable statistics i n a sustainable manner Strengthening the capacity DJ-MOH-290536-GO-RFQ / Ac of the National Institute of St quisition des données géogra Request for Quota Single Stage - One E Under Imple IDA / 66720 atistics of Djibouti (INSD) to Post Limited 8,000.00 0.00 2022-05-04 2022-06-09 2022-07-09 phiques pour la cartographie tions nvelope mentation produce and disseminate ti pilote. mely an d reliable statistics i n a sustainable manner DJ-MOH-290556-GO-RFQ / Ac Modernizing the Recipient's Request for Quota Single Stage - One E Under Imple quisition des équipements inf IDA / 66720 selected economic and fiscal Post Limited 20,000.00 0.00 2022-06-25 2022-08-20 2022-10-01 tions nvelope mentation ormatiques pour la DFE. management tools and proc esses DJ-MOH-290978-GO-DIR / Ac Modernizing the Recipient's quisition du logiciel DAD/Cori selected economic and fiscal Pending Impl IDA / 66720 Post Direct Selection Direct 132,000.00 0.00 2022-07-10 2022-07-15 2022-09-27 2022-11-11 olis au profit de la Direction d management tools and proc ementation e la Dette Publique. esses DJ-MOH-290991-GO-DIR / Ac Modernizing the Recipient's quisition des licences du logi selected economic and fiscal Pending Impl IDA / 66720 Post Direct Selection Direct 75,000.00 0.00 2022-06-20 2022-06-25 2022-07-14 2022-09-12 ciel oracle pour la direction d management tools and proc ementation e la Dette Publique. esses Page 1 DJ-MOH-295339-GO-RFB / Ac Modernizing the Recipient's quisition de matériels de repr selected economic and fiscal Single Stage - One E Pending Impl ographie et acquisitions de IDA / 66720 Post Request for Bids Open - National 120,000.00 0.00 2022-07-25 2022-07-30 2022-09-10 2022-10-10 2022-11-14 2022-12-20 management tools and proc nvelope ementation matériels informatiques et ré esses seaux pour la direction du bu dget. Strengthening the capacity DJ-MOH-296420-GO-RFQ / Ac of the National Institute of St quisition des matériels de ter Request for Quota Single Stage - One E Under Imple IDA / 66720 atistics of Djibouti (INSD) to Post Limited 27,045.00 0.00 2022-06-05 2022-07-15 2022-08-05 rain pour la cartographie pilo tions nvelope mentation produce and disseminate ti te mely an d reliable statistics i n a sustainable manner DJ-MOH-242044-NC-DIR / Ac Modernizing the Recipient's quisition du logiciel SYGADE selected economic and fiscal IDA / 66720 Post Direct Selection Direct 423,000.00 423,000.00 Signed 2022-05-26 2022-06-15 2022-05-31 2022-06-15 2022-07-05 2022-04-13 2024-07-04 version 6 pour la direction de management tools and proc la dette publique esses Strengthening the capacity DJ-MOH-290524-GO-RFB / Ac of the National Institute of St Single Stage - One E Pending Impl quisition des équipements de IDA / 66720 atistics of Djibouti (INSD) to Post Request for Bids Open - National 189,606.00 0.00 2022-06-09 2022-06-14 2022-07-14 2022-08-13 2022-09-17 2022-10-31 nvelope ementation bureau produce and disseminate ti mely an d reliable statistics i n a sustainable manner DJ-MOH-290985-GO-RFQ / Ac Modernizing the Recipient's Request for Quota Single Stage - One E Pending Impl quisition d'un coffre fort pour IDA / 66720 selected economic and fiscal Post Limited 8,000.00 0.00 2022-07-25 2022-09-03 2022-10-18 tions nvelope ementation la Direction de la dette Publi management tools and proc que esses Strengthening the capacity DJ-MOH-290529-GO-RFQ / Ac of the National Institute of St quisition d'autres équipemen Request for Quota Single Stage - One E Pending Impl IDA / 66720 atistics of Djibouti (INSD) to Post Limited 6,200.00 0.00 2022-07-09 2022-08-18 2022-09-17 ts de bureau pour la mise en tions nvelope ementation produce and disseminate ti place du BCR mely an d reliable statistics i n a sustainable manner Strengthening the capacity DJ-MOH-290541-GO-RFQ / Ac of the National Institute of St hats des fournitures de terrai Request for Quota Single Stage - One E Pending Impl IDA / 66720 atistics of Djibouti (INSD) to Post Limited 26,790.00 0.00 2022-06-28 2022-08-07 2022-08-28 n pour le dénombrement pilo tions nvelope ementation produce and disseminate ti te mely an d reliable statistics i n a sustainable manner Strengthening the capacity DJ-MOH-291130-GO-RFB / Ac of the National Institute of St Open - Internationa Single Stage - One E Under Imple quisition des tablettes pour l IDA / 66720 atistics of Djibouti (INSD) to Post Request for Bids 392,000.00 0.00 2022-06-15 2022-08-07 2022-06-20 2022-08-04 2022-10-12 2022-08-25 2022-10-13 2022-11-24 l nvelope mentation e RGPH3. produce and disseminate ti mely an d reliable statistics i n a sustainable manner DJ-MOH-332501-GO-RFQ / Ac Modernizing the Recipient's Request for Quota Single Stage - One E Pending Impl quisition des équipements inf IDA / 66720 selected economic and fiscal Post Limited 25,000.00 0.00 2023-01-08 2023-03-05 2023-03-20 tions nvelope ementation ormatiques pour la direction management tools and proc du budget esses DJ-MOH-332509-GO-RFQ / Fo Modernizing the Recipient's urnitures et équipements de selected economic and fiscal Request for Quota Single Stage - One E Pending Impl IDA / 66720 Post Limited 25,000.00 0.00 2023-01-03 2023-02-08 2023-02-23 bureau pour l'appui au Cadre management tools and proc tions nvelope ementation Fiscal à Moyen Terme. esses DJ-MOH-333503-GO-RFQ / Ac Strengthening the capacity quisition des équipements inf of the National Institute of St Request for Quota Single Stage - One E Under Imple ormatiques pour la direction IDA / 66720 atistics of Djibouti (INSD) to Post Limited 26,500.00 0.00 2023-01-01 2023-02-04 2023-03-21 tions nvelope mentation des statistiques économique produce and disseminate ti s de l'INSTAD mely an d reliable statistics i n a sustainable manner DJ-MOH-333505-GO-RFQ / Ac Strengthening the capacity quisition des mobiliers de bur of the National Institute of St Request for Quota Single Stage - One E Pending Impl eau pour la direction des stat IDA / 66720 atistics of Djibouti (INSD) to Post Limited 25,000.00 0.00 2023-01-01 2023-02-04 2023-03-21 tions nvelope ementation istiques économiques de l'IN produce and disseminate ti STAD. mely an d reliable statistics i n a sustainable manner Strengthening the capacity DJ-MOH-290550-GO-DIR / Ac of the National Institute of St quisition du logiciel pour le c IDA / 66720 atistics of Djibouti (INSD) to Post Direct Selection Direct 40,000.00 0.00 Canceled 2022-07-10 2022-07-15 2022-08-03 2022-10-02 alcul de la balance des paie produce and disseminate ti ments mely an d reliable statistics i n a sustainable manner DJ-MOH-360783-GO-RFB / Ac Modernizing the Recipient's Open - Internationa Single Stage - One E Pending Impl quisition et formation du logi IDA / 66720 selected economic and fiscal Post Request for Bids 60,000.00 0.00 2023-06-18 2023-06-23 2023-08-07 2023-08-28 2023-10-02 2023-12-01 l nvelope ementation ciel de GEMS pour la DEP. management tools and proc esses DJ-MOH-361597-GO-RFQ / M Modernizing the Recipient's Request for Quota Single Stage - One E Pending Impl obiliers de bureau pour le DF IDA / 66720 selected economic and fiscal Post Limited 4,000.00 0.00 2023-05-30 2023-07-25 2023-09-08 tions nvelope ementation E. management tools and proc esses DJ-MOH-361599-GO-RFQ / Ac Request for Quota Single Stage - One E Pending Impl quisition des mobiliers de bur IDA / 66720 Project Management Post Limited 5,000.00 0.00 2023-06-09 2023-08-04 2023-09-03 tions nvelope ementation eau pour l'UGP. DJ-MOH-361596-GO-RFQ / Ac Modernizing the Recipient's Request for Quota Single Stage - One E quisition d'un véhicule 4*4 p IDA / 66720 selected economic and fiscal Post Limited 45,000.00 0.00 Canceled 2023-05-27 2023-07-22 2023-09-20 tions nvelope our la DFE. management tools and proc esses DJ-MOH-361928-GO-RFB / Ac Modernizing the Recipient's quisition des véhicules : selected economic and fiscal Single Stage - One E Pending Impl 1 pour la DEP IDA / 66720 Post Request for Bids Open - National 163,320.00 0.00 2023-05-30 2023-06-04 2023-07-16 2023-08-15 2023-09-19 2023-12-18 management tools and proc nvelope ementation 1 pour la DDP esses 1 pour la DFE NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-MOH-242170-NC-RFQ / Tr Request for Quota Single Stage - One E Under Imple avaux de dératisation du bâti IDA / 66720 Project Management Post Limited 25,000.00 0.00 2021-07-17 2021-07-08 2021-09-11 2022-09-11 tions nvelope mentation ment abritant les locaux de l' UGP du Projet. DJ-MOH-246525-NC-DIR / Ap Strengthening the capacity pui technique de l’AFRISTAT of the National Institute of St Under Imple à l’INSTAD pour la production IDA / 66720 atistics of Djibouti (INSD) to Post Direct Selection Direct 550,000.00 0.00 2021-08-09 2021-08-05 2021-08-14 2021-08-08 2021-09-18 2025-09-17 mentation des statistiques économique produce and disseminate ti s national. mely an d reliable statistics i n a sustainable manner Page 2 DJ-MOH-254096-GO-RFQ / Ac Strengthening the capacity hat de billets d'avions pour le of the National Institute of St s bénéficiaires de la formatio atistics of Djibouti (INSD) to Request for Quota Single Stage - One E Pending Impl n de la 1ère cohorte d'ingéni IDA / 66720 Post Open - National 25,000.00 0.00 2021-09-24 2021-10-06 2021-10-09 produce and disseminate ti tions nvelope ementation eurs statisticiens à l'ENSEA d mely an d reliable statistics i e Dakar dans le cadre du ren n a sustainable manner forcement des capacités de l' INSTAD. DJ-MOH-291739-NC-RFQ / Ac Modernizing the Recipient's quisition d'un système d'arch selected economic and fiscal Request for Quota Single Stage - One E Under Imple IDA / 66720 Post Limited 30,000.00 0.00 2022-07-15 2022-08-24 2022-10-23 ivage électronique pour la Di management tools and proc tions nvelope mentation rection de la Dette Publique. esses DJ-MOH-242089-NC-RFQ / Re crutement d'un Technicien In formatique pour la maintena Request for Quota Single Stage - One E nce du réseau et du matériel IDA / 66720 Project Management Post Limited 10,000.00 0.00 Canceled 2021-07-17 2021-09-11 2022-09-11 tions nvelope informatique (imprimante, ph otocopieuse, ordinateur, sca nneur, projecteur, etc.) de l'U nité de Gestion du Projet. Strengthening the capacity DJ-MOH-290547-GO-RFQ / Ac of the National Institute of St quisition des matériels de ter Request for Quota Single Stage - One E Pending Impl IDA / 66720 atistics of Djibouti (INSD) to Post Limited 2,000.00 0.00 2022-07-10 2022-08-19 2022-09-18 rain pour la cartographie cen tions nvelope ementation produce and disseminate ti sitaire générale. mely an d reliable statistics i n a sustainable manner CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-MOH-203035-CS-CQS / Re crutement d'un consultant na Consultant Qualifi IDA / 66720 Project Management Post Limited 12,000.00 0.00 Canceled 2020-11-15 2020-11-22 2020-11-29 2020-12-03 2021-01-02 tional pour l'elaboration du M cation Selection anuel de Procedure du projet DJ-MOH-204759-CS-QCBS / R Quality And Cost- Open - Internationa ecrutement d’un auditeur ext IDA / 66720 Project Management Post 150,000.00 0.00 Canceled 2020-12-31 2021-01-21 2021-03-06 2021-04-03 2021-05-03 2021-06-07 2021-07-12 2022-07-12 Based Selection l erne pour le projet DJ-MOH-204764-CS-QCBS / R ecrutement d'un Consultant Quality And Cost- IDA / 66720 Project Management Post Open - National 12,000.00 0.00 Canceled 2020-12-31 2021-01-21 2021-03-06 2021-04-03 2021-05-03 2021-06-07 2021-07-12 2022-07-12 pour la realisation des Etude Based Selection s Impact Environnemental et Social DJ-MOH-220754-CS-LCS / Re Least Cost Selecti Open - Internationa Under Implement IDA / 66720 Project Management Post 50,000.00 0.00 2021-02-28 2021-06-10 2021-03-07 2021-07-12 2021-03-28 2022-03-16 2021-04-25 2022-03-23 2021-05-09 2022-05-18 2021-05-30 2022-06-01 2021-07-04 2024-06-18 crutement d'un cabinet d'aud on l ation it. DJ-MOH-204761-CS-QCBS / R Modernizing the Recipient's ecrutement d'un Bureau d ’ét selected economic and fiscal Quality And Cost- Open - Internationa ude pour les études techniqu IDA / 66720 Post 200,000.00 0.00 Canceled 2020-12-31 2021-05-27 2021-01-21 2021-03-06 2021-04-03 2021-05-03 2021-06-07 2021-07-12 2022-07-12 management tools and proc Based Selection l es et la supervision des trava esses ux du bâtiment de l’ISD DJ-MOH-236788-CS-LCS / Re Strengthening the capacity crutement d'un Cabinet de c of the National Institute of St Quality And Cost- Open - Internationa Under Implement ontrôle et de supervision pou IDA / 66720 atistics of Djibouti (INSD) to Post 200,000.00 0.00 2021-06-13 2023-01-24 2021-06-18 2021-06-20 2021-07-30 2021-10-13 2021-08-27 2021-09-17 2021-10-22 2021-11-26 2023-05-20 Based Selection l ation r les travaux de construction produce and disseminate ti du bâtiment de l'INSD/MEFI. mely an d reliable statistics i n a sustainable manner DJ-MOH-258485-CS-CQS / Re Strengthening the capacity crutement d’un expert nation of the National Institute of St Consultant Qualifi Under Implement al portant appui au secrétari IDA / 66720 atistics of Djibouti (INSD) to Post Open - National 16,000.00 0.00 2021-10-17 2021-10-21 2022-05-19 2022-06-02 2022-06-09 2022-06-23 2023-06-23 cation Selection ation at du Comité National d’ende produce and disseminate ti ttement public mely an d reliable statistics i n a sustainable manner Strengthening the capacity DJ-MOH-258488-CS-CQS / Re of the National Institute of St crutement d’un expert intern Consultant Qualifi Open - Internationa Under Implement IDA / 66720 atistics of Djibouti (INSD) to Post 25,000.00 0.00 2021-10-17 2021-10-21 2021-10-31 2021-11-14 2021-11-28 2021-12-12 2022-01-26 ational pour la formation sur cation Selection l ation produce and disseminate ti la conception de projets mely an d reliable statistics i n a sustainable manner Strengthening the capacity DJ-MOH-258489-CS-CQS / Re of the National Institute of St crutement d’un expert intern Consultant Qualifi Open - Internationa Under Implement IDA / 66720 atistics of Djibouti (INSD) to Post 60,000.00 0.00 2021-10-17 2022-09-13 2021-11-02 2022-09-27 2021-11-16 2021-11-23 2021-12-07 2022-06-05 ational en évaluation d’impa cation Selection l ation produce and disseminate ti ct mely an d reliable statistics i n a sustainable manner DJ-MOH-291021-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant i selected economic and fiscal Consultant Qualifi Open - Internationa Pending Impleme IDA / 66720 Post 30,000.00 0.00 2022-09-04 2022-09-25 2022-11-08 2022-12-08 2023-01-12 2023-02-11 nternational pour le développ management tools and proc cation Selection l ntation ement d'instruments de dett esses e intérieure. DJ-MOH-361606-CS-LCS / Re crutement d'un cabinet d'aud Least Cost Selecti Open - Internationa Pending Impleme IDA / 66720 Project Management Post 28,000.00 0.00 2023-06-15 2023-07-06 2023-08-19 2023-09-16 2023-10-16 2023-11-20 2023-12-25 2026-12-24 it externe pour l'audit des co on l ntation mptes annuels du projet INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-MOH-200091-CS-INDV / R Individual Consult ecrutement d’un spécialiste IDA / 66720 Project Management Post Limited 28,235.00 28,235.00 Signed 2020-10-11 2020-10-25 2020-10-19 2020-11-30 2020-10-24 2020-12-03 2020-11-03 2020-12-07 2021-11-03 ant Selection de la Passation des marchés DJ-MOH-200087-CS-INDV / R Individual Consult ecrutement d'un spécialiste IDA / 66720 Project Management Post Limited 28,235.00 28,235.00 Terminated 2020-10-11 2020-10-25 2020-10-19 2020-12-10 2020-10-24 2020-12-20 2020-11-03 2020-12-24 2021-11-03 ant Selection de la gestion financière DJ-MOH-200089-CS-INDV / R Individual Consult ecrutement d'une spécialiste IDA / 66720 Project Management Post Limited 28,235.00 2,300.00 Signed 2020-10-11 2020-10-25 2020-10-19 2020-12-02 2020-10-24 2020-12-10 2020-11-03 2020-12-16 2021-11-03 ant Selection du suivi et évaluation DJ-MOH-200092-CS-INDV / A Individual Consult ssistante du projet et respon IDA / 66720 Project Management Post Limited 21,176.00 21,176.00 Signed 2020-10-11 2020-11-04 2020-10-20 2020-10-25 2020-10-25 2020-10-26 2020-11-04 2020-11-05 2021-11-04 ant Selection sable de la communication Page 3 DJ-MOH-198678-CS-INDV / R ecrutement d'un chef de proj Individual Consult et pour l'UGP (projet de gesti IDA / 66720 Project Management Post Open 48,000.00 48,000.00 Signed 2020-05-20 2020-09-10 2020-07-19 2020-09-20 2020-08-03 2020-09-20 2020-09-10 2020-09-21 2021-09-10 ant Selection on économique et développe ment statistique pour la prise de décision). Strengthening the capacity DJ-MOH-218465-CS-INDV / R of the National Institute of St ecrutement d'un Assistant Te Individual Consult IDA / 66720 atistics of Djibouti (INSD) to Post Open 240,000.00 0.00 Canceled 2021-02-22 2021-02-18 2021-04-05 2021-04-26 2021-05-31 2022-05-31 chnique pour la DISIG de l'IN ant Selection produce and disseminate ti SD. mely an d reliable statistics i n a sustainable manner Strengthening the capacity DJ-MOH-218466-CS-INDV / R of the National Institute of St ecrutement d'un Assistant Te Individual Consult IDA / 66720 atistics of Djibouti (INSD) to Post Open 240,000.00 0.00 Canceled 2021-02-22 2021-02-18 2021-03-29 2021-04-19 2021-05-24 2022-05-24 chnique pour la DSDS de l'IN ant Selection produce and disseminate ti SD. mely an d reliable statistics i n a sustainable manner DJ-MOH-218518-CS-INDV / R ecrutement d'un Expert Inter Modernizing the Recipient's national - Long Terme pour l' selected economic and fiscal Individual Consult Under Implement élaboration du Cadre Budgét IDA / 66720 Post Open 300,000.00 0.00 2021-02-22 2021-02-18 2021-03-29 2021-04-19 2021-05-24 2022-05-24 management tools and proc ant Selection ation aire à Moyen Terme (CBMT) esses global et du Cadre des Dépe nses à Moyen Terme (CDMT) sectoriel pour la direction du Budget. DJ-MOH-218836-CS-INDV / R ecrutement d'un Expert Inter Modernizing the Recipient's national - Long Terme pour l' selected economic and fiscal Individual Consult Under Implement IDA / 66720 Post Open 300,000.00 0.00 2021-02-22 2022-06-13 2021-03-29 2021-04-19 2021-05-24 2022-05-24 élaboration d'un nouveau ca management tools and proc ant Selection ation dre budgétaire sur la réforme esses de la loi organique pour la dir ection du Budget. Strengthening the capacity DJ-MOH-218859-CS-INDV / R of the National Institute of St ecrutement d'un Assistant Te Individual Consult IDA / 66720 atistics of Djibouti (INSD) to Post Open 240,000.00 0.00 Canceled 2021-02-22 2021-02-18 2021-03-29 2021-04-19 2021-05-24 2022-05-24 chnique International pour la ant Selection produce and disseminate ti Direction Générale de l'INSD. mely an d reliable statistics i n a sustainable manner DJ-MOH-220736-CS-INDV / R ecrutement d'un consultant p Individual Consult Under Implement IDA / 66720 Project Management Post Open 25,000.00 0.00 2021-02-28 2021-03-17 2021-04-04 2021-04-25 2021-05-30 2021-07-04 our la préparation du manuel ant Selection ation de procédures du Projet. DJ-MOH-220879-CS-CDS / Re Strengthening the capacity crutement d'un Consultant c of the National Institute of St ourt-terme pour l'appui au pil IDA / 66720 atistics of Djibouti (INSD) to Post Direct Selection Direct 15,000.00 16,460.00 Signed 2021-02-28 2021-03-26 2021-03-10 2021-03-21 2021-04-21 2021-03-31 2021-05-21 otage de la réforme de l'Insti produce and disseminate ti tut National de la Statistique mely an d reliable statistics i de Djibouti (INSD). n a sustainable manner Strengthening the capacity DJ-MOH-226987-CS-CDS / Re of the National Institute of St crutement d'un Ingénieur-co IDA / 66720 atistics of Djibouti (INSD) to Post Direct Selection Direct 72,000.00 36,000.00 Signed 2021-04-04 2021-04-08 2021-04-14 2021-04-06 2021-05-19 2021-04-15 2023-05-09 nseil pour l'UGP. produce and disseminate ti mely an d reliable statistics i n a sustainable manner DJ-MOH-226844-CS-CDS / Re crutement d'un Consultant In dividuel chargé du suivi de la IDA / 66720 Project Management Post Direct Selection Direct 50,000.00 33,666.07 Signed 2021-04-04 2021-04-08 2021-04-14 2021-03-17 2021-05-19 2021-04-12 2022-11-10 mise en œuvre des documen ts de sauvegardes environne mentales et sociales du Proje t. DJ-MOH-238885-CS-CDS / Re nforcement des capacités de Strengthening the capacity l'INSD à travers la formation of the National Institute of St d'une première cohorte de vi atistics of Djibouti (INSD) to IDA / 66720 Post Direct Selection Direct 350,000.00 405,317.00 Signed 2021-06-13 2021-07-13 2021-06-23 2021-07-22 2021-08-27 2022-04-13 2023-08-27 ngt (20) ingénieurs statisticie produce and disseminate ti ns économistes (ISE), ingénie mely an d reliable statistics i urs des travaux statistiques ( n a sustainable manner ITS) et analystes statisticiens (AS) à l'ENSEA de Dakar (Sén égal). DJ-MOH-238899-CS-INDV / R ecrutement d'un Consultant I Strengthening the capacity nternational à court terme po of the National Institute of St ur l'appui à l'Institut de la Sta atistics of Djibouti (INSD) to Individual Consult tistique de Djibouti (INSD) à l' IDA / 66720 Post Direct 30,000.00 14,000.00 Signed 2021-06-13 2021-06-14 2021-06-20 2021-08-18 2021-07-04 2021-06-28 2021-08-01 2021-06-25 2021-08-31 produce and disseminate ti ant Selection élaboration du document de mely an d reliable statistics i projet du troisième Recense n a sustainable manner ment Général de la Populatio n et de l'Habitat de la Républ ique de Djibouti. DJ-MOH-239028-CS-INDV / R Strengthening the capacity ecrutement d'un Consultant I of the National Institute of St Individual Consult nternational long terme pour IDA / 66720 atistics of Djibouti (INSD) to Post Open 96,000.00 90,200.00 Signed 2021-06-20 2021-06-14 2021-08-08 2021-11-28 2021-08-29 2022-01-19 2021-10-03 2022-01-24 2022-10-03 ant Selection la Direction Générale (DG) de produce and disseminate ti l'INSD. mely an d reliable statistics i n a sustainable manner DJ-MOH-239043-CS-INDV / R Strengthening the capacity ecrutement d'un Consultant I of the National Institute of St Individual Consult nternational long terme pour IDA / 66720 atistics of Djibouti (INSD) to Post Open 96,000.00 90,200.00 Signed 2021-06-20 2021-06-14 2021-08-08 2021-11-22 2021-08-29 2021-12-30 2021-10-03 2022-01-12 2022-10-03 ant Selection la Direction du Système d’Inf produce and disseminate ti ormation Géographique (DSI mely an d reliable statistics i G) de l'INSD. n a sustainable manner DJ-MOH-239049-CS-INDV / R Strengthening the capacity ecrutement d'un Consultant I of the National Institute of St Individual Consult Under Implement nternational pour la Direction IDA / 66720 atistics of Djibouti (INSD) to Post Open 96,000.00 0.00 2021-06-20 2021-06-14 2021-08-08 2021-08-29 2021-10-03 2022-10-03 ant Selection ation des Statistiques Démographi produce and disseminate ti ques et Sociales (DSDS) de l'I mely an d reliable statistics i NSD. n a sustainable manner DJ-MOH-291003-CS-INDV / R Strengthening the capacity ecrutement d'un consultant i of the National Institute of St Individual Consult ndividuel en démographie po IDA / 66720 atistics of Djibouti (INSD) to Post Open 76,690.00 0.00 Canceled 2022-07-10 2022-08-20 2022-09-04 2022-10-13 2022-11-12 ant Selection ur la cartographie censitaire produce and disseminate ti générale mely an d reliable statistics i n a sustainable manner DJ-MOH-291006-CS-INDV / R ecrutement d'un consultant n Modernizing the Recipient's ational pour seconder d'expe selected economic and fiscal Individual Consult Under Implement IDA / 66720 Post Open 25,000.00 0.00 2022-05-02 2022-09-11 2022-05-29 2022-05-30 2022-06-18 2022-11-15 rt international pour l'élabora management tools and proc ant Selection ation tion d'un nouveau cadre bud esses gétaire pour la Direction du B udget. DJ-MOH-291014-CS-INDV / R Modernizing the Recipient's ecrutement d'un expert inter selected economic and fiscal Individual Consult Under Implement IDA / 66720 Post Open 20,000.00 0.00 2022-09-05 2022-07-24 2022-10-16 2022-10-26 2022-11-14 2022-12-29 national pour la réforme du c management tools and proc ant Selection ation adre institutionnel du Financ esses ement Extérieur. Page 4 DJ-MOH-291015-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant i selected economic and fiscal Individual Consult Pending Impleme IDA / 66720 Post Open 20,000.00 0.00 2022-10-23 2022-11-28 2022-12-08 2022-12-27 2023-01-16 nternational pour la négociati management tools and proc ant Selection ntation on de projets (DFE). esses DJ-MOH-291032-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant p selected economic and fiscal Individual Consult Pending Impleme IDA / 66720 Post Limited 3,500.00 0.00 2022-05-05 2022-05-10 2022-05-20 2022-06-08 2022-07-23 our la conception et la réalisa management tools and proc ant Selection ntation tion pour un site pour la DEP esses DJ-MOH-291033-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant p selected economic and fiscal Individual Consult Pending Impleme IDA / 66720 Post Limited 3,500.00 0.00 2022-05-10 2022-05-15 2022-05-25 2022-06-13 2022-07-28 our la conception et la réalisa management tools and proc ant Selection ntation tion pour un site pour la Dire esses ction du Budget. DJ-MOH-291035-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant p selected economic and fiscal Individual Consult Under Implement IDA / 66720 Post Limited 3,500.00 0.00 2022-05-10 2021-11-24 2022-05-15 2022-05-25 2022-06-13 2022-07-28 our la conception et la réalisa management tools and proc ant Selection ation tion pour un site pour la direc esses tion du budget. DJ-MOH-220881-CS-CDS / Re crutement de femmes de mé IDA / 66720 Project Management Post Direct Selection Direct 10,000.00 0.00 Canceled 2021-02-28 2021-03-17 2021-03-10 2021-04-07 2022-04-07 nages du Projet. DJ-MOH-220880-CS-INDV / R Individual Consult IDA / 66720 Project Management Post Open 15,000.00 0.00 Canceled 2021-02-28 2021-03-17 2021-03-26 2021-04-02 2021-04-23 2022-04-23 ecrutement de chauffeurs po ant Selection ur le Projet. DJ-MOH-230016-CS-CDS / Re crutement d'un consultant in Modernizing the Recipient's ternational court terme pour selected economic and fiscal l'appui à l'élaboration d'une F IDA / 66720 Post Direct Selection Direct 30,000.00 0.00 Canceled 2021-04-30 2021-05-10 2021-06-21 2021-07-21 management tools and proc euille de Route pour le cadra esses ge macro-économique et le p assage au Budget programm e (CDMT/CBMT). DJ-MOH-253820-CS-CDS / Re crutement d’un Consultant c Strengthening the capacity ourt-terme pour l’appui de l’I of the National Institute of St nstitut de la Statistique de Dj atistics of Djibouti (INSD) to Under Implement IDA / 66720 Post Direct Selection Direct 15,000.00 0.00 2022-05-30 2022-05-30 2022-06-09 2022-08-13 2022-09-02 ibouti (INSTAD) à l’élaboratio produce and disseminate ti ation n du document de plaidoyer mely an d reliable statistics i et de mobilisation du budget n a sustainable manner du 3ième RGPH de la Républi que de Djibouti DJ-MOH-291010-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant n selected economic and fiscal Individual Consult Under Implement ational en charge de la prépa IDA / 66720 Post Open 25,000.00 0.00 2022-05-25 2022-09-18 2022-07-13 2022-08-03 2022-09-07 2022-11-06 management tools and proc ant Selection ation ration d'un CDMT et d'un CB esses MT pour la direction du Budg et. DJ-MOH-291028-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant p selected economic and fiscal Individual Consult Under Implement IDA / 66720 Post Open 15,000.00 0.00 2022-06-16 2022-09-27 2022-08-04 2022-08-25 2022-09-29 2022-10-29 our l'élaboration d'un manuel management tools and proc ant Selection ation de procédures pour la DDP. esses DJ-MOH-294960-CS-CQS / Re Modernizing the Recipient's crutement d'un consultant po selected economic and fiscal Individual Consult Under Implement ur l'analyse coût/bénéfice de IDA / 66720 Post Open 28,000.00 0.00 2022-05-31 2022-06-08 2022-07-19 2022-08-09 2022-09-13 2022-10-28 management tools and proc ant Selection ation s projets au profit de la direct esses ion de la dette publique DJ-MOH-291013-CS-INDV / R ecrutement d'un expert inter Modernizing the Recipient's national pour le diagnostic d selected economic and fiscal Individual Consult Under Implement u système fiscal et l'élaborati IDA / 66720 Post Open 40,000.00 0.00 2022-06-15 2022-11-06 2022-08-03 2022-08-24 2022-09-28 2022-11-12 management tools and proc ant Selection ation on de feuille de route de la ré esses forme de la fiscalité pour le S ecrétariat Général du Ministè re du Budget . Modernizing the Recipient's DJ-MOH-286996-CS-CDS / Co Under Implement IDA / 66720 selected economic and fiscal Post Direct Selection Direct 415,326.00 0.00 2022-06-12 2022-06-19 2022-06-22 2022-08-26 2024-10-14 nvention AFRISTAT-DEP. ation management tools and proc esses DJ-MOH-291017-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant i selected economic and fiscal Individual Consult Under Implement nternational pour l'élaboratio IDA / 66720 Post Open 49,000.00 0.00 2022-07-17 2022-06-22 2022-09-04 2022-09-25 2022-10-30 2022-12-14 management tools and proc ant Selection ation n de la stratégie et du plan d' esses emprunt annuel pour la DDP. DJ-MOH-291004-CS-INDV / R Strengthening the capacity ecrutement d'un consultant i of the National Institute of St Individual Consult ndividuel en informatique po IDA / 66720 atistics of Djibouti (INSD) to Post Open 76,690.00 0.00 Canceled 2022-06-20 2022-06-22 2022-08-08 2022-08-29 2022-10-03 2022-11-12 ant Selection ur la cartographie censitaire produce and disseminate ti générale. mely an d reliable statistics i n a sustainable manner DJ-MOH-290999-CS-CQS / Ex Modernizing the Recipient's pert international-Long Term selected economic and fiscal Individual Consult Under Implement IDA / 66720 Post Open 150,000.00 0.00 2022-07-18 2022-09-12 2022-09-05 2022-09-26 2022-10-31 2023-01-29 e/CDMT Sectoriel pour la Dire management tools and proc ant Selection ation ction du Budget. esses Strengthening the capacity DJ-MOH-304149-CS-INDV / E of the National Institute of St Individual Consult Direct - Internation Pending Impleme xpert international long term IDA / 66720 atistics of Djibouti (INSD) to Post 200,000.00 0.00 2022-07-20 2022-07-30 2022-08-09 2022-09-02 2023-08-28 ant Selection al ntation e DSDS de l'INSTAD produce and disseminate ti mely an d reliable statistics i n a sustainable manner DJ-MOH-319105-CS-INDV / R Strengthening the capacity ecrutement d’un consultant of the National Institute of St pour la conception des outils atistics of Djibouti (INSD) to Individual Consult Under Implement IDA / 66720 Post Limited 20,000.00 0.00 2022-10-10 2022-11-06 2022-10-15 2022-11-05 2022-12-10 2023-01-24 de communication et de diffu produce and disseminate ti ant Selection ation sion dans le cadre de la mise mely an d reliable statistics i en place des indices de conjo n a sustainable manner ncture économique. DJ-MOH-333897-CS-INDV / R Strengthening the capacity ecrutement d'un expert inter of the National Institute of St Individual Consult Direct - Internation national pour l'appui techniq IDA / 66720 atistics of Djibouti (INSD) to Post 107,000.00 0.00 Under Review 2023-01-03 2023-03-08 2023-01-13 2023-02-03 2023-02-27 2024-02-22 ant Selection al ue de la direction générale d produce and disseminate ti e l'INSTAD mely an d reliable statistics i n a sustainable manner DJ-MOH-333899-CS-INDV / R Strengthening the capacity ecrutement d'un expert inter of the National Institute of St Individual Consult Direct - Internation Pending Impleme national pour l'appui techniq IDA / 66720 atistics of Djibouti (INSD) to Post 107,000.00 0.00 2023-01-03 2023-01-13 2023-02-03 2023-02-27 2024-02-22 ant Selection al ntation ue de la direction du systèm produce and disseminate ti e information géographique mely an d reliable statistics i de l'INSTAD. n a sustainable manner Page 5 DJ-MOH-336892-CS-INDV / R Strengthening the capacity ecrutement d'un expert inter of the National Institute of St national pour la revue finale atistics of Djibouti (INSD) to Individual Consult Open - Internationa Under Implement IDA / 66720 Post 48,000.00 0.00 2023-01-23 2023-03-07 2023-03-13 2023-04-03 2023-05-02 2023-10-29 de la stratégie de croissance produce and disseminate ti ant Selection l ation accélérée et de promotion de mely an d reliable statistics i l'emploi (SCAPE 2015-2019). n a sustainable manner DJ-MOH-326277-CS-INDV / R Modernizing the Recipient's ecrutement d'un expert inter selected economic and fiscal Individual Consult Open - Internationa national pour la réalisation d' IDA / 66720 Post 100,000.00 0.00 Canceled 2022-11-16 2023-01-04 2023-01-25 2023-03-01 2023-08-28 management tools and proc ant Selection l un diagnostic du système fis esses cal et Feuille de Route de la Réforme de la fiscalité. DJ-MOH-346079-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant p selected economic and fiscal Individual Consult Under Implement our la conception d'un systè IDA / 66720 Post Open - National 30,000.00 0.00 2023-03-05 2023-04-23 2023-05-14 2023-06-18 2023-08-17 management tools and proc ant Selection ation me d'archivage électronique esses pour la direction de la dette publique. 2 / Recrutement d'un spécial Individual Consult Under Implement IDA / 66720 Project Management Post Direct - National 27,600.00 0.00 2022-04-01 2023-03-02 2022-04-11 2023-03-06 2022-04-16 2023-03-06 2022-05-03 2023-04-28 iste en gestion financière ant Selection ation 3 / Recrutement d'un spécial Individual Consult Under Implement IDA / 66720 Project Management Post Direct - National 30,000.00 0.00 2022-10-02 2023-03-02 2022-10-12 2023-03-13 2022-10-17 2022-11-03 2023-10-29 iste en passation des marché ant Selection ation s DJ-MOH-346474-CS-INDV / R Individual Consult Under Implement ecrutement d'un spécialiste e IDA / 66720 Project Management Post Direct - National 27,600.00 0.00 2022-10-09 2022-10-19 2022-11-09 2022-12-14 2023-12-09 ant Selection ation n suivi-évaluation 1 / Recrutement d'un coordi Individual Consult Under Implement IDA / 66720 Project Management Post Open - National 48,000.00 0.00 2022-07-10 2023-03-02 2022-08-08 2022-08-18 2022-09-04 2023-08-30 nateur du projet ant Selection ation Strengthening the capacity DJ-MOH-349655-CS-INDV / R of the National Institute of St ecrutement d'un expert carto Individual Consult Under Implement IDA / 66720 atistics of Djibouti (INSD) to Post Limited 28,000.00 0.00 2023-03-27 2023-03-20 2023-04-01 2023-04-06 2023-04-25 2023-07-24 graphe international pour le ant Selection ation produce and disseminate ti RGPH3. mely an d reliable statistics i n a sustainable manner Strengthening the capacity DJ-MOH-349674-CS-INDV / R of the National Institute of St ecrutement d'un expert inter Individual Consult Under Implement IDA / 66720 atistics of Djibouti (INSD) to Post Limited 28,000.00 0.00 2023-03-27 2023-03-20 2023-04-01 2023-04-06 2023-04-25 2023-07-24 national en informatique pou ant Selection ation produce and disseminate ti r le RGPH3. mely an d reliable statistics i n a sustainable manner DJ-MOH-356176-CS-CDS / M aintenance technique du logi Under Implement IDA / 66720 Project Management Post Direct Selection Direct - National 12,000.00 0.00 2023-04-20 2023-04-30 2023-05-20 2025-12-31 ciel de gestion financière et c ation omptable SUCCESS. DJ-MOH-361605-CS-INDV / R ecrutement d'un consultant i Modernizing the Recipient's nternational pour l'élaboratio selected economic and fiscal Individual Consult Open - Internationa Pending Impleme IDA / 66720 Post 25,000.00 0.00 2023-06-22 2023-08-10 2023-08-31 2023-10-05 2023-11-04 n et formation sur le manuel management tools and proc ant Selection l ntation de procédures pour le suivi-é esses valuation de politique publiq ue pour la DEP. DJ-MOH-361604-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant i selected economic and fiscal Individual Consult Open - Internationa Pending Impleme nternational pour l'élaboratio IDA / 66720 Post 60,000.00 0.00 2023-05-25 2023-07-13 2023-08-03 2023-09-07 2024-03-05 management tools and proc ant Selection l ntation n de la revue à mi parcours 2 esses 020-2022 du PND Djibouti DJ-MOH-361609-CS-INDV / R Individual Consult Pending Impleme ecrutement d'un spécialiste e IDA / 66720 Project Management Post Direct - National 27,600.00 0.00 2023-05-30 2023-06-09 2023-06-30 2023-08-04 2024-01-31 ant Selection ntation n suivi-évaluation pour le pro jet DJ-MOH-361611-CS-INDV / R Individual Consult Pending Impleme ecrutement d'un spécialiste e IDA / 66720 Project Management Post Direct - National 27,600.00 0.00 2023-05-30 2023-06-09 2023-06-30 2023-08-04 2024-01-31 ant Selection ntation n gestion financière pour le p rojet DJ-MOH-361607-CS-INDV / R Modernizing the Recipient's ecrutement d'un consultant i selected economic and fiscal Individual Consult Open - Internationa Pending Impleme IDA / 66720 Post 25,000.00 0.00 2023-05-30 2023-07-18 2023-08-08 2023-09-12 2024-03-10 nternational pour l'étude sect management tools and proc ant Selection l ntation orielle pour la DEP esses DJ-MOH-361608-CS-INDV / R Individual Consult Pending Impleme ecrutement d'un coordinateu IDA / 66720 Project Management Post Direct - National 48,000.00 0.00 2023-05-30 2023-06-09 2023-06-30 2023-08-04 2024-01-31 ant Selection ntation r pour le projet DJ-MOH-361610-CS-INDV / R Individual Consult Pending Impleme ecrutement d'un spécialiste e IDA / 66720 Project Management Post Direct - National 30,000.00 0.00 2023-10-01 2023-10-11 2023-11-01 2023-12-06 2024-12-05 ant Selection ntation n passation des marchés pou r le projet. DJ-MOH-363328-CS-INDV / R Modernizing the Recipient's ecrutement d'un expert inter selected economic and fiscal Individual Consult Direct - Internation Under Implement national pour l'élaboration de IDA / 66720 Post 28,000.00 0.00 2023-05-24 2023-06-03 2023-06-06 2023-06-16 2023-07-16 management tools and proc ant Selection al ation la stratégie et du plan d'actio esses ns pour la réforme des financ es publiques. DJ-MOH-363335-CS-INDV / R Modernizing the Recipient's ecrutement d'un expert natio selected economic and fiscal Individual Consult Under Implement nal pour l'élaboration de la st IDA / 66720 Post Direct - National 26,000.00 0.00 2023-05-24 2023-06-03 2023-06-24 2023-07-29 2023-09-07 management tools and proc ant Selection ation ratégie et du plan d'actions p esses our la réforme des finances p ubliques. Page 6 PROCUREMENT PLAN General 1. Project Information a. Country: Federal Republic of Somalia b. Project Name: Horn of Africa - Ground Water for Resilience - Somalia Component c. Project Number: P174867 d. Total Finance: USD 30 million 2. Project Implementation Agency: Ministry of Energy and Water Resources (MoEWR) 3. Date of Project Plan: January 2022 4. Period Covered by this Procurement: April2021 – Nov 2023 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” November 2020 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Document: The Bank’s standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified into Procurement Plan tables in STEP III. National Procurement Arrangements: Not applicable IV. Prequalification: Not applicable V. Leased Assets: Not Applicable VI. Procurement of Second-hand Goods: Not Applicable VII. Domestic Preference: Not Applicable 1 VIII. Hands on Expanded Implementation Support (HEIS): Not applicable IX. Other Relevant Procurement Information: Not Applicable X. Thresholds for Procurement Approaches and Method (US$ millions) Based on the risks identified above, the following procurement arrangements are proposed: a) Approach to Market: Based on previous experience and available local market, the following threshold will be used of open national/international and RFQ bidding (all figures in million USD) Table 1.2: Thresholds for procurement approaches and methods Procurement Methods (US$ millions)–Goods, Works, and Non- Consulting Services Open Open Request for Direct Category Internatio National Quotation Selection nal (RfQ) Works ≥ 5.0 <5.0 ≤ 0.2 All Values Goods, IT, and non- ≥ 0.5 <0.5 ≤ 0.1 All Values consultin g services Thresholds for Procurement Approaches and Methods (US$, millions) – Consulting Services Category Short List of National Consultants Consulting Engineering and Services Construction Supervision Consultants (Firms) ≤ 0.1 ≤ 0.2 Individual Consultants N/A N/A Direct Selection Consultants (Firms) All Values All Values Individual Consultants All Values All Values 2 XI. Table Packages for Goods, Works and Non-Consulting Services (At Negotiations – to be entered in STEP) Procurement Selection Estimat Bank Approach Ref. Contract Title, Description and Method Evaluation ed Cost Oversig (Open- No Category (RFP, RFB, Method (US$) ht National/ RFQ etc.) Limited etc.) Most Water Quality Testing kits for 5 states - G1 37,500.0 Prior Limited RFQ advantageous FGS 0 Bid Most Vehicles (1 per MS, 2 for FGS/MoEWR) - G2 315,000. Prior Open-National RFB advantageous FGS & 5 states 00 Bid Most GW office furniture and equipment - FGS & 144,000. Prior Open-National RFB advantageous G3 5 states 00 Bid Most Hydromet center data, information and 30,000.0 G4 Prior Limited RFQ advantageous national monitoring equipment - FGS 0 Bid 526,50 0.00 Works Most Design new/rehabilitate FGS MoEWR office 100,000. W1 Prior Limited RFQ advantageous - FGS 00 Bid Most 250,000. W2 Build new offices - 5 states Prior Open-National RFB advantageous 00 Bid Establish GW-data and information office Most 10,000.0 W3 section within National Hydromet Center - Prior Limited RFQ advantageous 0 FGS Bid 1 Procurement Selection Estimat Bank Approach Ref. Contract Title, Description and Method Evaluation ed Cost Oversig (Open- No Category (RFP, RFB, Method (US$) ht National/ RFQ etc.) Limited etc.) Engage construction engineering firm in Most 600,000. Open- W4 water point development / investments - 5 Prior RFB advantageous 00 International state Bid Most Open- W5 Develop the manually drilling technique 320,000 Prior RFB advantageous International Bid Sub- 1,280,000 Total Market Method Review by Approach Estimated (QCBS, Ref No. Contract Description Bank (Open- Cost (US$) LCBCS, QBS, (Prior/Post) National/ DS Limited etc.) Consulting Services Consultancy Services for back-stopping Open- C1 528,000.00 Prior QCBS engineers - FGS International Consultancy - Comprehensive hydrogeological Open C2 600,000.00 Prior QCBS survey - FGS International Consultancy - Study and development of Merti C3 200,000.00 Prior Open – National CQS auifer water - FGS 2 Market Method Review by Approach Estimated (QCBS, Ref No. Contract Description Bank (Open- Cost (US$) LCBCS, QBS, (Prior/Post) National/ DS Limited etc.) Consultancy - Study on resilient water supply Open- C4 for densely populated rural/peri-urban areas - 480,000.00 Prior QCBS International FGS & 5 States Consultancy Services - Rapid assessment of existing GW-governance condition (incl standards, guidelines) and (i) arrange interim C5 200,000.00 Prior Open - National CQS project system and (ii) present to government national comprehensive system - FGS (50% of project total) Consultancy Services - Develop national GW- C6 75,000.00 Prior Limited CQS strategy - FGS C7 Arrange water quality testing in Nairobi - FGS 10,000.00 Prior TBD TBD Consultancy Services - Develop business models for private sector engagement in GW C8 210,000.00 Prior Open-National CQS development, distribution and management - FGS Consultancy Services - Develop transboundary C9 water management models and engage in 150,000.00 Prior Open-National CQS cooperation - FGS Develop national GW data and information C10 25,000.00 Prior Open-National CQS management system - FGS Consultancy Services - Transfer of knowledge and method development (incl manual well- C11 250,000.00 Prior Open-National QCBS drilling, sustainable gw-management; reduce cost of investments) - FGS Consultancy Services - Develop academic BSc C12 education in GW development, management 150,000.00 Prior Open-National QCBS and monitoring - FGS 3 Market Method Review by Approach Estimated (QCBS, Ref No. Contract Description Bank (Open- Cost (US$) LCBCS, QBS, (Prior/Post) National/ DS Limited etc.) Consultancy Services - Arrange and deliver 1 year long "learning by doing & organized C13 40,000.00 Prior Limited INDV training" package in groundwater development and management. Consultancy Services - Assess capacity development status/needs, develop linked C14 strategy, prepare project training and 70,000.00 Prior Limited INDV curriculum in selected GW capacity development topics - FGS Consultancy Services - Develop, establish and C15 support project monitoring, evaluation and 60,000.00 Prior Limited INDV internal learning system - FGS Consultancy Services - Arrange and deliver GW C16 75,000.00 Prior Limited INDV capacity development (a package) - FGS Consultancy Services - Arrange and deliver GW Open- C17 400,000.00 Prior QCBS capacity development (a package) - 5 states International C18 Project Coordinator NPCU (18 month) - FGS 126,000.00 Prior Open-National INDV C19 Groundwater Engineer NPCU (18 month) - FGS 99,000.00 Prior Open-National INDV Social & Environmental Safeguard Specialist C20 63,000.00 Prior Open-National INDV NPCU (18 month) - FGS C21 Finance Specialist NPCU (18 month) - FGS 63,000.00 Prior Open-National INDV Procurement Specialist for NPCU (18 months) – C22 63,000.00 Prior Open-National INDV FGS C23 Security Specialist for NPCU (18 months) - FGS 63,000.00 Prior Open-National INDV Gender and Social Safeguard Specialist for C24 63,000.00 Prior Open-National INDV NPCU (18 months) - FGS Community Development Specialist for NPCU C25 63,000.00 Prior Open-National INDV (18 months) - FGS C26 Office Manager for NPCU - FGS 18,000.00 Prior Open-National INDV 4 Market Method Review by Approach Estimated (QCBS, Ref No. Contract Description Bank (Open- Cost (US$) LCBCS, QBS, (Prior/Post) National/ DS Limited etc.) Consultancy Services - Arrange a project C27 18,000.00 Prior Open-National INDV website and develop information strategy - FGS Security and Safeguard arrangements - FGS C28 450,000.00 Prior Open-National QCBS and 5 states C29 Water Engineer PIUs (18 month) – for 5 States 270,000.00 Prior Open-National QCBS Consultancy Services - Annual audit Services - C31 50,000.00 Prior Open-National LCS FGS Sub-total 4,932,000 Grand Total 6,738,500 5 PROCUREMENT Eastern and Southern Africa : Horn of Africa - Groundwater for Resilience Project PLAN General Information Country: Eastern and Southern Africa 2023-03-22 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174867 GPN Date: 2022-11-22 Project Name: Horn of Africa - Groundwater for Resilience Project Loan / Credit No: IDA / E0130, IDA / E0120 Ministry of Water and Irrigation Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOWI-346900-GO-RFB / Component three: Support f Single Stage - One E Pending Impl Supply and Delivery of Projec IDA / E0130 or project management, kno Post Request for Bids Open - National 660,000.00 0.00 2023-04-14 2023-04-28 2023-06-09 2023-07-09 2023-08-13 2023-11-21 nvelope ementation t Vehicles wledge & operations. KE-MOWI-348203-GO-RFB / Component two: Generating Supply and Delivery of variou groundwater information an Single Stage - One E Pending Impl IDA / E0120 Post Request for Bids Open - National 1,309,600.00 0.00 2023-05-16 2023-05-30 2023-07-11 2023-08-10 2023-09-14 2024-02-11 s Groundwater management d strengthening regional an nvelope ementation equipment for MoWSI and RC d national GW institutions GW KE-MOWI-356465-GO-RFB / Component three: Support f Supply and Delivery of assort Single Stage - One E Pending Impl IDA / E0130 or project management, kno Post Request for Bids Open - National 100,000.00 0.00 2023-04-30 2023-05-14 2023-06-13 2023-07-13 2023-08-17 2023-11-15 ed office furniture and Confer nvelope ementation wledge & operations. ence Facility for MoWSI KE-MOWI-348198-GO-RFB / Component three: Support f Supply and Delivery of assort Single Stage - One E Pending Impl IDA / E0130 or project management, kno Post Request for Bids Open - National 120,000.00 0.00 2023-04-04 2023-04-18 2023-05-30 2023-06-29 2023-08-03 2023-11-01 ed ICT Equipment and Acces nvelope ementation wledge & operations. sories for MOWSI & RCGW NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOWI-356535-NC-RFB / S Component two: Generating upply, Installation and Comm groundwater information an Single Stage - One E Pending Impl IDA / E0120 Post Request for Bids Open - National 150,000.00 0.00 2023-05-31 2023-06-14 2023-07-26 2023-08-25 2023-09-29 2024-05-01 issioning of Enterprise Resou d strengthening regional an nvelope ementation rce Planning for Regional Cen d national GW institutions tre on Ground Water CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOWI-348616-CS-QCBS / Consultancy services to deve Component three: Support f lop Framework for Regional C Quality And Cost- Open - Internationa Pending Impleme IDA / E0130 or project management, kno Prior 500,000.00 0.00 2023-07-17 2023-08-07 2023-09-20 2023-10-18 2023-11-17 2023-12-22 2024-01-26 2025-01-25 ooperation on Development Based Selection l ntation wledge & operations. and Management of Trans-bo undary Aquifers for Daua and Merti - Country Position Pape r KE-MOWI-352002-CS-CQS / Component two: Generating Consultancy services to Revi groundwater information an Consultant Qualifi Pending Impleme ew ground water research, tr IDA / E0120 Post Limited 100,000.00 0.00 2023-04-13 2023-04-27 2023-05-27 2023-07-01 2023-11-28 d strengthening regional an cation Selection ntation aining, public awareness/edu d national GW institutions cation and consultancy servi ces guidelines KE-MOWI-348614-CS-QCBS / Consultancy services for the Component three: Support f Quality And Cost- Open - Internationa Pending Impleme Development of trans-bound IDA / E0130 or project management, kno Prior 500,000.00 0.00 2023-04-10 2023-05-01 2023-06-14 2023-07-12 2023-08-11 2023-09-15 2023-10-20 2024-10-19 Based Selection l ntation ary water management Srate wledge & operations. gy, Regulations and guidelin es KE-MOWI-348626-CS-CQS / Consultancy services to unde rtake Training needs assess Component two: Generating ment, and Design a Series of groundwater information an Consultant Qualifi Pending Impleme IDA / E0120 Post Limited 150,000.00 0.00 2023-08-10 2023-08-24 2023-09-23 2023-10-28 2024-11-29 Capacity Building and Trainin d strengthening regional an cation Selection ntation g program on groundwater ( d national GW institutions GW) management and Gover nance across national and co unty-level institutions in Ken ya KE-MOWI-353653-CS-QCBS / Consultancy services for the Component three: Support f Quality And Cost- Open - Internationa Finalization of draft Trans bo IDA / E0130 or project management, kno Prior 700,000.00 0.00 Under Review 2023-04-10 2023-05-01 2023-06-14 2023-07-12 2023-08-11 2023-09-15 2023-10-20 2024-10-19 Based Selection l undary Water Policy and dev wledge & operations. elopment of Trans boundary Water Bill. KE-MOWI-348634-CS-QCBS / Consultancy services for deta iled design, development of bidding documents and Bill o Component three: Support f Quality And Cost- Open - Internationa Pending Impleme f Quantities, Environmental S IDA / E0130 or project management, kno Post 420,000.00 0.00 2023-07-06 2023-07-27 2023-09-09 2023-10-07 2023-11-06 2023-12-11 2024-01-15 2025-01-14 Based Selection l ntation ocial Impact Assessment (ESI wledge & operations. A) and construction supervisi on of works for the Regional Centre for Ground Water buil ding headquarters KE-MOWI-352012-CS-CQS / Component two: Generating Consultancy services to Revi groundwater information an Consultant Qualifi IDA / E0120 Post Limited 100,000.00 0.00 Under Review 2023-04-15 2023-06-20 2023-04-29 2023-05-29 2023-07-03 2023-12-28 ew and develop Regional Cen d strengthening regional an cation Selection tre on Ground Water strategi d national GW institutions c plan 2023 - 2027 Page 1 KE-MOWI-348617-CS-QCBS / Consultancy services for the Component three: Support f Quality And Cost- Open - Internationa Under Implement National groundwater develo IDA / E0130 or project management, kno Prior 830,000.00 0.00 2024-01-16 2024-02-06 2024-03-21 2024-04-18 2024-05-18 2024-06-22 2024-07-27 2025-07-27 Based Selection l ation pment and Management Stra wledge & operations. tegy, Regulations and Guidel ines INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MOWI-348622-CS-INDV / Individual Consultant Selecti Component two: Generating on - Senior Technical Advisor groundwater information an Individual Consult IDA / E0120 Post Limited 100,000.00 0.00 Under Review 2023-04-10 2023-06-20 2023-04-15 2023-05-06 2023-06-10 2023-09-18 for capacity building and Des d strengthening regional an ant Selection ign and Development of train d national GW institutions ing activities for Regional Ce ntre on Ground Water Page 2 PROCUREMENT PLAN (Textual Part) Project information: Grenada – Digital Government for Resilience Project (P167588) Project Implementation agency: MOIDI – Ministry of Infrastructure Development and Implementation Date of the Procurement Plan: September 30, 2019 Period covered by this Procurement Plan: From September 2019 to March 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the national procurement legislation, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: The corresponding Procurement Documents must be acceptable to the World Bank. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations and the corresponding Procurement Documents must be acceptable to the World Bank. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: “Not Applicable”; Works: “Not Applicable” Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is “Not Applicable” Other Relevant Procurement Information. “Not Applicable” PROCUREMENT Grenada : Digital Government for Resilience PLAN General Information Country: Grenada Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: GPN Date: Project Name: Digital Government for Resilience Loan / Credit No: / Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PLAN DE PASSATION DE MARCHÉS Information sur le Projet : BURKINA FASO : Projet de préparation et de riposte au COVID-19 du Burkina Faso (P173858) Agence d’exécution du Projet : PRSS Date du plan de passation des marchés : 9 Avril 2020 Période couverte par ce plan de passation des marchés : Avril à Juin 2020 Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016 révisé en Juillet et Août 2020) (“Règlement de Passation des Marchés”) l’Emprunteur utilise les outils électroniques de planification et de suivi de la passation des marchés (STEP) pour préparer, valider et actualiser ses plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Cette partie textuelle ainsi que les tableaux du plan de passation des marchés dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types d’appel d’offres publiés par la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale ainsi que pour tous les autres contrats spécifiés dans les tableaux du plan de passation des marchés inclus dans STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, au cas où la procédure de passation des marché est retenue (telle que spécifiée dans les tableaux du plan de passation des marchés inclus dans STEP), les procédures de passation de marchés du pays considéré peuvent être appliquées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le code des marchés publics (Décret no 207- 0049/PRES/PM/MINEFID portant procédures de passation, d’exécution et de règlement des marchés publics et des délégations de service public), ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : - Contrôle a priori des structures de contrôle des marchés publics (DCMEF et DGCMEF) et autorisations sur les ententes directes : Non applicable; -Seuils nationaux de passation de marchés : Non applicable -Rejet de l’offre anormalement inférieure ou supérieure de 15 % de la moyenne du montant prévisionnel du client et de la moyenne des offres conformes : Non applicable - Application selon le financement de la marge de préférence nationale, communautaire et locale (collectivités locales) : Non applicable -Signature d’un nouveau marché pour donner suite à une variation du montant du marché de plus de 30 % du montant initial; Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués dans le Plan de passation des marchés : « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués dans le Plan de passation des marchés : « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas Travaux ne s’applique pas L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique. Autres informations pertinentes sur la passation des marchés Néant. SEUILS POUR LES METHODES DE PASSATION ET MARCHES 1. TRAVAUX, FOURNITURES ET SERVICES AUTRE QUE SERVICES DE CONSULTANTS Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES (US$ TRAVAUX (US$ équivalent) équivalent) AOI AON CFEN AOI AON CF ≥10.000.0 <10.000.0 <1.00.0 ≥1.000.0 <1.000.0 <500.0 00 00 00 00 00 00 2. SELECTION DE CONSULTANTS - Liste restreinte composée entièrement de firmes nationales: La liste restreinte de consultants pour les prestations d’études d’ingénierie, de contrôle et de surveillance estimées à moins de 300,000 US$ par contrat, et pour tout autre type de prestations, estimées à moins de 100 000 US$ par contrat, peut comporter entièrement de consultants nationaux selon les dispositions du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’investissement (FPI) - Passation des Marchés de fournitures, de travaux et de services (autres que les services de consultants) et Services de Consultants, Juillet 2016, révisés en novembre 2017 et Août 2018 et l’Emprunteur ne procède pas à une publication dans UNDB. - Autre arrangement spécial de Sélection de consultants : Le seuil pour l’utilisation de la méthode de sélection de consultant fondée sur les qualifications des consultants est déterminé au cas par cas en tenant compte de la nature et de la complexité de la mission; Mode de seléction (à indiquer parmi : Approche pré/post Achat (à qualification, indiquer Demande Méthode Revue parmi : d'offres/ d'évaluation (à N° Coût préalable national/ demande de indiquer parmi du Catégorie de estimatif du Intitulé du marché de la internationa propositions/ critères mar marché marché en Banque l/ ouvert/ dialogue évalués VfM/ ché USD (Oui/Non) restreint/ compétitif/ Couts évalué direct/ Accord-cadre/ moins élevé mono- Enchère source) inversée/ Sélection coût qualité/ Négociation Acquisition de 50 000 Kits de protection Sélection 1. Fourniture 1,434,000 non Négociation individuelle pour les Directe investigations Dotation de chaque formations sanitaires Offre d'au moins un Post économique thermomètres laser et qualification/d 2. Fourniture 95,900 non cotation ment la plus acquisition de 50 emande de avantageus pulvérisateurs au profit cotation e des Sites d’isolement et de prise en charge Dotation de chaque non Sélection Négociation 3. CHR/CHUR/CHU d'une Fourniture 236,160 Directe radiographie mobile (BFP) cotation Post Offre qualification/d économique Acquérir 200 lits et 4. Fourniture 58,640 non emande de ment la plus matelas d'hospitalisation cotation avantageus e Acquisition de 2 tentes médicalisées de cent (100) lits pour Ouaga et Sélection Négociation 5. Bobo, puis six (06) de Fourniture 31,860 Non Directe cinquantes (50) lits pour (BFP) les hôpitaux du projet et de 24 contenaires Mode de seléction (à indiquer parmi : Approche pré/post Achat (à qualification, indiquer Demande Méthode Revue parmi : d'offres/ d'évaluation (à N° Coût préalable national/ demande de indiquer parmi du Catégorie de estimatif du Intitulé du marché de la internationa propositions/ critères mar marché marché en Banque l/ ouvert/ dialogue évalués VfM/ ché USD (Oui/Non) restreint/ compétitif/ Couts évalué direct/ Accord-cadre/ moins élevé mono- Enchère source) inversée/ Sélection coût qualité/ Négociation aménagés pour les pointes d'entrée Acquisition de la logistique roulante : 2 véhicules pick up par Sélection Négociation 6. Fourniture 800,000 Non région et par district Directe cible et aussi une ambulance par DS, Acquérir des tests de diagnostic du COVID19 Sélection 7. au profit de 70 000 Fourniture 2,500,000 Non Directe Négociation personnes (140 000 * (BFP) 25 000f) Acquérir trois cent milles masques en matériels Sélection 8. locaux pour les Fourniture 180,000 Non Directe Négociation personnels de santé et (BFP) leur famille PROCUREMENT Burkina Faso : Burkina Faso COVID-19 Preparedness and Response Project PLAN General Information Country: Burkina Faso 2020-05-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173858 GPN Date: Project Name: Burkina Faso COVID-19 Preparedness and Response Project Loan / Credit No: IDA / 66380, IDA / 71920, TF / B8826 Health Services Reinforcement Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PRSS-172951-GO-DIR / A Emergency COVID-19 Respo cquisition de 8 000 Kits de pr IDA / 66380 Post Direct Selection Direct 462,069.00 434,311.82 Completed 2020-05-26 2020-11-18 2020-05-27 2020-06-30 2020-06-12 2021-01-09 2020-07-12 2021-05-21 nse otection individuelle pour les investigations BF-PRSS-173190-GO-RFQ / A cquisition de 200 lits et mate Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 51,724.00 53,959.16 Completed 2020-05-29 2020-08-31 2020-06-28 2020-10-31 2020-07-28 2021-03-27 las d'hospitalisation pour les nse tions nvelope sites de PEC et d'isolement BF-PRSS-173242-GO-DIR / A cquisition des modules de ge Implementation Managemen stion comptable Tom2Pro (pa IDA / 66380 t and Monitoring and Evaluat Post Direct Selection Direct 12,069.00 12,499.33 Completed 2020-05-28 2020-07-27 2020-05-31 2020-07-14 2020-06-14 2020-10-08 2020-07-14 2021-12-11 ramétrage, formation et suivi ion ) pour le projet COVID 19 BF-PRSS-173244-GO-DIR / A cquisition de 150 000 masqu Implementation Managemen es en matériaux locaux et de IDA / 66380 t and Monitoring and Evaluat Post Direct Selection Direct 503,448.00 353,088.45 Completed 2020-05-28 2020-06-11 2020-05-31 2020-06-08 2020-06-12 2020-08-18 2020-07-12 2020-10-29 30 000 gel hydro alcooliques ion de 350 ml au profit des ASBC et autres leaders communaut aires impliqués. BF-PRSS-173251-GO-DIR / A cquisition de sept cent cinqu ante (750) dispositifs de lave Emergency COVID-19 Respo IDA / 66380 Post Direct Selection Direct 81,896.00 81,481.95 Completed 2020-05-28 2020-06-11 2020-05-31 2020-06-15 2020-06-10 2020-08-22 2020-07-10 2020-10-29 mains sans pédale et deux c nse ent cinquante (250) avec péd ale au profit des formations s anitaires. BF-PRSS-172975-GO-DIR / A Emergency COVID-19 Respo cquisition de 24 containers a IDA / 66380 Post Direct Selection Direct 331,034.00 326,238.52 Completed 2020-05-26 2020-07-17 2020-05-29 2020-06-09 2020-06-18 2020-08-29 2020-07-18 2021-06-15 nse ménagés pour les points d'en trée BF-PRSS-172977-GO-DIR / A cquisition de trois cent mille Emergency COVID-19 Respo s (300000) masques en maté IDA / 66380 Post Direct Selection Direct 362,069.00 353,088.45 Completed 2020-05-26 2020-07-17 2020-05-29 2020-06-11 2020-06-29 2020-08-22 2020-07-02 2021-02-18 nse riels locaux pour les personn els de santé et leur famille BF-PRSS-172986-GO-DIR / A Implementation Managemen ssurer le ravitaillement en flu IDA / 66380 t and Monitoring and Evaluat Post Direct Selection Direct 344,828.00 362,142.42 Completed 2020-05-26 2020-09-23 2020-05-31 2020-06-11 2020-06-21 2020-10-31 2020-11-18 2021-07-20 ides médicaux pour la réani ion mation des malades au CHU Tengandogo BF-PRSS-173176-GO-DIR / A cquisition de thermomètres l aser au profit des formations Emergency COVID-19 Respo IDA / 66380 Post Direct Selection Direct 112,069.00 102,395.65 Completed 2020-05-26 2020-07-17 2020-05-27 2020-07-08 2020-06-12 2020-08-07 2020-07-12 2020-10-29 sanitaires, des postes de pol nse ice des entrées des grandes villes et des marchés et yaar s. BF-PRSS-175006-GO-DIR / A Implementation Managemen cquisition de matériels de vi IDA / 66380 t and Monitoring and Evaluat Post Direct Selection Direct 137,931.00 122,519.02 Completed 2020-05-30 2020-09-23 2020-06-04 2020-06-12 2020-06-17 2020-10-10 2020-08-01 2021-06-29 sio-conférence pour la salle d ion e réunion de l'UGP BF-PRSS-172971-GO-DIR / A cquisition de 2 tentes médic alisées et climatisées de cent Emergency COVID-19 Respo (100) lits pour Ouaga et Bobo IDA / 66380 Post Direct Selection Direct 491,379.00 489,076.04 Completed 2020-05-26 2020-10-01 2020-05-27 2020-09-11 2020-07-03 2020-12-09 2020-08-17 2022-04-28 nse , puis six (06) tentes de cinq uante (50) lits pour les hôpit aux de la zone d'intervention du projet BF-PRSS-178288-GO-RFQ / A Implementation Managemen Request for Quota Single Stage - One E cquisition de matériels et m IDA / 66380 t and Monitoring and Evaluat Post Limited 22,387.00 19,363.52 Completed 2020-06-14 2020-12-15 2020-07-02 2021-04-01 2020-08-01 2022-03-08 tions nvelope obiliers du bureau pour l'UGP ion BF-PRSS-195225-GO-DIR / A Emergency COVID-19 Respo cquisition quarante mille (40 IDA / 66380 Post Direct Selection Direct 965,517.00 1,046,354.40 Completed 2020-10-15 2020-10-20 2020-10-18 2020-10-14 2020-10-28 2020-11-28 2020-12-27 2021-01-19 nse 000) tests de diagnostic rapi de du COVID19 BF-PRSS-199978-GO-RFQ / A Emergency COVID-19 Respo Request for Quota Single Stage - One E cquisition du savon boule po IDA / 66380 Post Limited 51,724.00 54,411.06 Completed 2020-10-31 2020-11-17 2020-11-24 2020-12-29 2020-12-15 2021-04-03 nse tions nvelope ur les formations sanitaires BF-PRSS-173255-GO-DIR / A cquisition d'équipements d'i magerie médicale (cinq (05) Emergency COVID-19 Respo Scanners de 16 barrettes) au IDA / 66380 Post Direct Selection Direct 4,703,448.00 5,097,240.72 Completed 2020-05-30 2020-10-22 2020-06-02 2020-10-22 2020-06-26 2020-11-28 2020-08-25 2021-08-10 nse profit des CHU CDG, CHUR O uahigouya, CHR Tenkodogo, CHR Gaoua et CHR de Kaya); etc. BF-PRSS-199988-GO-RFQ / A cquisition de 32 motocyclette Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 113,103.00 118,538.00 Completed 2020-10-29 2020-11-17 2020-11-18 2020-12-05 2021-01-17 2021-03-26 s pour la supervision à raison nse tions nvelope de cinq par DS cible du proje t et une par DRS Page 1 BF-PRSS-199997-GO-DIR / A cquisition de moyens logistiq Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 1,475,862.00 1,497,355.16 Completed 2020-11-02 2020-11-17 2020-12-05 2021-03-23 2021-02-03 2021-11-16 ues roulants : 08 ambulances nse tions nvelope , 16 véhicules pick up double s cabines . BF-PRSS-199987-GO-RFQ / A cquisition d'un groupe électr Emergency COVID-19 Respo Request for Quota Single Stage - One E ogène insonorisé d'au moins IDA / 66380 Post Limited 51,724.00 37,878.82 Completed 2020-10-29 2020-11-17 2020-11-22 2021-01-01 2020-12-13 2021-03-04 nse tions nvelope 120 KVA pour le Laboratoire National de Référence -Grip pe (LNR-G) BF-PRSS-199990-GO-RFQ / A cquisition de matériels médic otechnique (autoclave, table Emergency COVID-19 Respo Request for Quota Single Stage - One E s d'examen, tables de consul IDA / 66380 Post Limited 689,655.00 726,352.82 Completed 2020-11-04 2020-11-17 2020-11-28 2020-12-30 2021-01-27 2021-11-14 nse tions nvelope tations, d'accouchement, boi tes de césarienne, boites de pansement etc..), balances p èse personne, tensiomètres) BF-PRSS-199977-GO-RFQ / A cquisition de 100 000 masqu es en matériaux locaux (lot1 ), et 31 500 gel hydro-alcool Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 241,379.00 71,242.78 Completed 2020-11-01 2020-12-04 2020-11-25 2021-02-05 2020-12-25 2021-04-03 ique de 100 ml , 25 distribute nse tions nvelope urs automatiques avec recha rge et 500 gel hydro-alcooliq ue de 350 ml (lot 2) pour les étudiants et les enseignants des ENPS BF-PRSS-199989-GO-RFQ / A cquisition de médicaments et consommables médicaux: M Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 258,621.00 240,327.94 Completed 2020-11-02 2022-04-14 2020-12-31 2022-05-25 2021-03-01 2022-07-08 édicaments essentiels généri nse tions nvelope ques et consommables médi caux (lot 1) , Médicaments de spécialités (LOT 2). BF-PRSS-200794-GO-RFQ / A cquisition de 5 SAS de désinf Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 328,441.00 337,378.27 Completed 2020-11-01 2020-11-26 2020-11-29 2021-01-09 2021-01-28 2021-04-29 ection intelligents pour les aé nse tions nvelope roports de Ouagadougou et d e Bobo Dioulasso BF-PRSS-172984-GO-DIR / A cquisition de matériels infor matiques et péri-informatiqu Emergency COVID-19 Respo es pour le personnel de COVI IDA / 66380 Post Direct Selection Direct 43,103.00 0.00 Canceled 2020-05-27 2020-05-30 2020-06-23 2020-07-23 nse D-19 (six ordinateurs portabl es, six stations de travail, qu atre imprimantes multifoncti on en couleur, deux vidéo pr ojecteurs) BF-PRSS-200795-GO-RFQ / A cquisition de matériels infor matiques et péri-informatiqu Implementation Managemen Request for Quota Single Stage - One E es pour le personnel de COVI IDA / 66380 t and Monitoring and Evaluat Post Limited 43,103.00 33,198.69 Completed 2020-11-04 2020-12-15 2020-12-02 2021-04-15 2021-01-01 2021-06-16 tions nvelope D-19 (six ordinateurs portabl ion es, six stations de travail, qu atre imprimantes multifoncti on en couleur, deux vidéo pr ojecteurs) BF-PRSS-202406-GO-RFQ / C Implementation Managemen Request for Quota Single Stage - One E onception et enregistrement IDA / 66380 t and Monitoring and Evaluat Post Limited 1,050.00 925.50 Completed 2020-11-09 2020-12-23 2020-12-07 2021-01-30 2020-12-28 2021-07-10 tions nvelope du logo du PPR- COVID-19 ion BF-PRSS-199979-GO-RFQ / A cquisition du matériel médico Emergency COVID-19 Respo Request for Quota Single Stage - One E techniques au profit des cent IDA / 66380 Post Limited 689,655.00 704,950.34 Completed 2020-11-02 2020-11-26 2020-12-07 2021-01-09 2021-02-05 2021-11-13 nse tions nvelope res de traitement de COVID-1 9(équipements de laboratoir es) BF-PRSS-202459-GO-RFQ / R eproduction 1056 boîtes a i Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 416,110.00 412,112.09 Completed 2020-11-15 2021-06-29 2020-12-07 2021-10-07 2021-01-21 2022-01-15 mage sur la surveillance com nse tions nvelope munautaire du COVID 19 BF-PRSS-175003-GO-DIR / A Implementation Managemen cquisition de fournitures et c IDA / 66380 t and Monitoring and Evaluat Post Direct Selection Direct 7,759.00 0.00 Canceled 2020-05-30 2020-06-04 2020-06-13 2020-06-14 onsommables de bureau pou ion r l'UGP BF-PRSS-205200-GO-RFQ / A Implementation Managemen Request for Quota Single Stage - One E cquisition de fourniture et de IDA / 66380 t and Monitoring and Evaluat Post Limited 7,759.00 5,974.32 Completed 2020-11-28 2020-12-23 2020-12-22 2021-02-12 2021-01-12 2021-12-18 tions nvelope consommable de bureau au ion profit de l'UGP BF-PRSS-205314-GO-DIR / A cquisition de cent mille (100 Emergency COVID-19 Respo 000) VTM (Kit de prélèvemen IDA / 66380 Post Direct Selection Direct 659,630.00 713,220.95 Completed 2020-11-25 2020-11-27 2020-11-28 2020-11-20 2020-12-26 2021-01-09 2021-02-24 2021-03-31 nse t PCR et milieu de transport) au profit du Ministère de la S anté BF-PRSS-172974-GO-DIR / R estauration des personnes co Emergency COVID-19 Respo IDA / 66380 Post Direct Selection Direct 603,448.00 0.00 Canceled 2020-05-26 2020-05-31 2020-06-28 2020-07-28 nfinées sous forme de kits ali nse mentaire (28 000 personnes) BF-PRSS-173245-GO-DIR / A cquisition de cent mille (100 Implementation Managemen 000) VTM (Kit de prélèvemen IDA / 66380 t and Monitoring and Evaluat Post Direct Selection Direct 275,862.00 0.00 Canceled 2020-10-14 2020-10-17 2020-10-29 2020-11-28 t PCR et milieu de transport) ion au profit du Ministère de la S anté BF-PRSS-207061-GO-DIR / A cquisition 20 laves mains aut Emergency COVID-19 Respo IDA / 66380 Post Direct Selection Direct 24,569.00 24,635.01 Terminated 2020-12-15 2021-08-19 2020-12-18 2021-01-08 2020-12-28 2021-10-30 2021-02-11 omatiques avec séchage des nse mains (Entrées des services de réanimation) BF-PRSS-207063-GO-RFQ / A cquisition de 400 pulvérisate Emergency COVID-19 Respo Request for Quota Single Stage - One E urs au profit des sites d’isole IDA / 66380 Post Limited 40,690.00 0.00 Canceled 2020-12-18 2021-02-05 2021-01-18 2021-02-17 nse tions nvelope ment et de prise en charge r épartis à travers le pays BF-PRSS-207099-GO-RFQ / A Implementation Managemen cquisition deux (02) vehicule Request for Quota Single Stage - One E IDA / 66380 t and Monitoring and Evaluat Post Limited 124,138.00 123,088.42 Completed 2020-12-26 2021-08-18 2021-01-28 2021-11-23 2021-04-28 2022-04-22 s: un Pik-up et un station wa tions nvelope ion gon pour le projet COVID-19 BF-PRSS-207100-GO-RFQ / A Emergency COVID-19 Respo Request for Quota Single Stage - One E cquisition de 183 860 bavet IDA / 66380 Post Limited 63,400.00 66,548.17 Completed 2020-12-30 2021-02-04 2021-01-21 2021-04-01 2021-01-24 2021-05-01 nse tions nvelope tes pour la formation des AS BC Page 2 BF-PRSS-207066-GO-RFQ / A Emergency COVID-19 Respo Request for Quota Single Stage - One E cquisition de réactifs de suivi IDA / 66380 Post Limited 517,241.00 515,630.79 Completed 2021-01-09 2021-04-09 2021-01-31 2021-11-06 2021-04-01 2022-01-13 nse tions nvelope biologiques des patients COV ID-19 BF-PRSS-207065-GO-RFQ / A Emergency COVID-19 Respo Request for Quota Single Stage - One E cquisition de réactifs PCR CO IDA / 66380 Post Limited 1,205,765.00 1,267,189.46 Completed 2021-01-09 2021-02-05 2021-02-13 2021-04-13 2021-04-14 2021-06-03 nse tions nvelope VID-19 pour les sept laborato ires BF-PRSS-207068-GO-RFQ / A Emergency COVID-19 Respo Request for Quota Single Stage - One E cquisition de consommables IDA / 66380 Post Limited 86,207.00 80,690.67 Signed 2021-01-09 2021-12-27 2021-01-31 2022-04-07 2021-03-17 nse tions nvelope de fonctionnement pour les l aboratoires BF-PRSS-209858-GO-DIR / Lo Emergency COVID-19 Respo cation de dix (10) véhicules p IDA / 66380 Post Direct Selection Direct 109,862.00 115,490.59 Completed 2021-01-15 2021-02-17 2021-01-20 2021-02-02 2021-02-05 2021-04-21 2021-06-05 2021-10-29 nse our appuyer les opération ter rain du CORUS BF-PRSS-207073-GO-RFQ / R éalisation de fiches pédagogi Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 8,621.00 0.00 Canceled 2021-01-02 2021-02-06 2021-03-08 ques sur la COVID_19 pour l’ nse tions nvelope éducation des enfants dans l es écoles BF-PRSS-234713-GO-DIR / A cquisition, installation et mis Emergency COVID-19 Respo IDA / 66380 Post Direct Selection Direct 1,031,134.00 1,033,903.55 Completed 2021-05-31 2021-09-07 2021-06-05 2021-07-14 2021-06-26 2021-10-17 2021-09-24 e en service d'un scanner 16 nse barrettes/32 coupes au profit du CHR de Fada BF-PRSS-234714-GO-DIR / A ménagement et équipement Emergency COVID-19 Respo Request for Quota Single Stage - One E d'un conteneur 40 pieds en l IDA / 66380 Post Limited 102,997.00 99,035.77 Signed 2021-06-05 2021-10-12 2021-07-13 2021-12-30 2021-10-11 nse tions nvelope aboratoire de bactériologie a u profit du CHR de Fada BF-PRSS-234733-GO-RFQ / F ourniture de divers matériels Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 10,345.00 10,313.97 Completed 2021-06-05 2021-10-28 2021-07-15 2022-01-20 2021-07-18 2022-04-08 au profit du service sauvegar nse tions nvelope de environnemental BF-PRSS-265252-GO-RFQ / A Emergency COVID-19 Respo Request for Quota Single Stage - One E cquisition d'un camion de tra IDA / 66380 Post Limited 206,897.00 0.00 Completed 2021-12-15 2022-04-19 2022-01-17 2022-04-17 2022-11-10 nse tions nvelope nsport des déchets biomédic aux BF-PRSS-288880-GO-DIR / A cquisition de médicaments, d Emergency COVID-19 Respo IDA / 66380 Post Direct Selection Direct 453,468.00 318,492.79 Signed 2022-04-07 2022-04-05 2022-04-08 2022-04-05 2022-04-10 2022-05-14 2022-04-24 e consommables et de réacti nse f au profit du ministère de la santé BF-PRSS-300308-GO-RFQ / D Emergency COVID-19 Respo Request for Quota Single Stage - One E éplacement de 03 containers IDA / 66380 Post Limited 1,000.00 0.00 Completed 2022-07-05 2022-08-10 2022-07-19 2022-08-09 2022-12-14 nse tions nvelope du point d'entrée de Farama na BF-PRSS-316667-GO-DIR / A Emergency COVID-19 Respo Direct - Internation Under Imple cquisition de doses de vaccin IDA / 71920 Prior Direct Selection 37,879,359.00 0.00 2022-10-10 2023-02-16 2022-10-14 2023-02-20 2022-11-18 2024-06-10 nse al mentation s COVID_19 BF-PRSS-325469-GO-DIR / A cquisition de doses de vaccin Emergency COVID-19 Respo Direct - Internation Under Imple s de routine et d'équipement IDA / 71920 Prior Direct Selection 6,421,139.02 0.00 2022-11-30 2023-02-22 2022-12-03 2023-02-23 2022-12-08 2024-06-24 nse al mentation de la chaine froid au profit de la Direction de la Prevention par la vaccination. BF-PRSS-316662-GO-RFQ / A cquisition d'équipements de désinfection aérienne (Aéros ept VF 250), de collecte(cont Emergency COVID-19 Respo Request for Quota Single Stage - One E Pending Impl eneurs de 80 et 240 l,boites IDA / 66380 Post Limited 148,500.00 0.00 2023-02-27 2023-04-03 2023-06-02 nse tions nvelope ementation de sécurité,sachets poubelle s) et de EPI (2000 gants,500 bottes,500 lunettes,2000 ma sques) au profit des établisse ments de santé (3 lots) BF-PRSS-316664-GO-RFQ / C Implementation Managemen onfection et reproduction d'o Request for Quota Single Stage - One E IDA / 66380 t and Monitoring and Evaluat Post Limited 17,250.00 0.00 Canceled 2022-10-22 2022-11-26 2022-12-26 utils dans le cadre du fonctio tions nvelope ion nnement du MGP (2 lots) BF-PRSS-345639-GO-RFQ / A cquisition de matériels infor Emergency COVID-19 Respo Request for Quota Single Stage - One E Pending Impl matiques et péri informatiqu IDA / 71920 Post Limited 69,727.00 0.00 2023-03-15 2023-04-17 2023-06-16 nse tions nvelope ementation es pour le suivi des activités de vaccination (ordinateurs p ortables , périphériques…) BF-PRSS-336173-GO-RFQ / A Emergency COVID-19 Respo Request for Quota Single Stage - One E Pending Impl cquisition des 240 motos po IDA / 71920 Post Limited 665,455.00 0.00 2023-02-26 2023-03-25 2023-06-23 nse tions nvelope ementation ur les activités de stratégies avancées BF-PRSS-347498-GO-RFQ / R eproduction des outils ( 3049 Registres de vaccination cont re la Covid-19,3049 Registres Emergency COVID-19 Respo Request for Quota Single Stage - One E Pending Impl IDA / 71920 Post Limited 166,139.00 0.00 2023-04-13 2023-05-17 2024-05-11 de gestion des vaccins , 304 nse tions nvelope ementation 9 Registres de gestion des co nsommables ) de gestion des sites de vaccination au profit de la DPV BF-PRSS-351152-GO-DIR / A cquisition; installation et mis e en service d'unités de prod Emergency COVID-19 Respo Direct - Internation Pending Impl uction d'oxygène pour le renf TF / B8826 Post Direct Selection 2,181,458.00 0.00 2023-04-06 2023-04-09 2023-05-01 2023-08-29 nse al ementation orcement des dispositifs de p roduction autonome dans les hôpitaux (CHR DE DORI,DE K AYA ET DE GAOUA) BF-PRSS-351469-GO-DIR / A Emergency COVID-19 Respo Pending Impl cquisition des produits contra TF / B8826 Post Direct Selection Direct - National 909,091.00 0.00 2023-04-10 2023-04-15 2023-05-07 2023-07-06 nse ementation ceptifs au profit des formatio ns sanitaires BF-PRSS-336463-GO-RFQ / R eproduction des cartes de va Emergency COVID-19 Respo Pending Impl IDA / 71920 Post Direct Selection Direct - National 2,181,818.18 0.00 2023-02-27 2023-03-02 2023-03-26 2024-03-20 ccinations sécurisées avec u nse ementation n code QR au profit de la DP V BF-PRSS-353797-GO-RFQ / A Emergency COVID-19 Respo Request for Quota Single Stage - One E Pending Impl ménagement du bâtiment de IDA / 66380 Post Limited 7,200.00 0.00 2023-04-13 2023-05-28 2023-06-27 nse tions nvelope ementation scanner du CHR de FADA N'G OURMA Page 3 BF-PRSS-354329-GO-RFQ / A cquisition de matériel de stér Implementation Managemen Request for Quota Single Stage - One E Pending Impl ilisation (Autoclave mobile) a TF / B8826 t and Monitoring and Evaluat Post Limited 96,137.00 0.00 2023-04-20 2023-05-28 2023-08-26 tions nvelope ementation u profit de la Direction de la ion Santé et de la Famille (DSF) BF-PRSS-354334-GO-RFQ / R eproduction d'outils pour la D irection de la Nutrition dans l Implementation Managemen Request for Quota Single Stage - One E Pending Impl e cadre de la mise en œuvre TF / B8826 t and Monitoring and Evaluat Post Limited 63,636.00 0.00 2023-04-20 2023-05-30 2023-06-05 tions nvelope ementation de la stratégie de PB à domic ion ile au profit des structures sa nitaires et des ASBC du Centr e -Est BF-PRSS-354336-GO-RFQ / A Implementation Managemen Request for Quota Single Stage - One E Pending Impl cquisition de bandelettes de TF / B8826 t and Monitoring and Evaluat Post Limited 18,182.00 0.00 2023-04-20 2023-05-28 2023-06-06 tions nvelope ementation Shakir au profit de la Directio ion n de la Nutrition BF-PRSS-355496-GO-RFB / A cquisition de logistique roula Implementation Managemen nte : 11 véhicules Pick up po Single Stage - One E IDA / 66380 t and Monitoring and Evaluat Post Request for Bids Open - National 1,623,190.00 0.00 Canceled 2023-04-12 2023-04-17 2023-05-01 2023-05-04 2023-05-25 2023-09-22 ur les DS et DC, et 13 véhicul nvelope ion es 4x4 station wagon pour le s DRS pour les activités de su pervision et de terrain BF-PRSS-354304-GO-RFQ / A Implementation Managemen cquisition de petits matériels Request for Quota Single Stage - One E Pending Impl TF / B8826 t and Monitoring and Evaluat Post Limited 188,124.00 0.00 2023-04-20 2023-05-24 2023-08-22 médical au profit de la Direct tions nvelope ementation ion ion de la Santé et de la Famil le (DSF) BF-PRSS-354328-GO-RFQ / R Implementation Managemen eproduction de divers suppor Request for Quota Single Stage - One E Pending Impl TF / B8826 t and Monitoring and Evaluat Post Limited 53,770.00 0.00 2023-04-20 2023-05-24 2023-07-23 ts au profit de la Direction de tions nvelope ementation ion la Santé et de la Famille (DSF ) BF-PRSS-358540-GO-RFQ / A Implementation Managemen cquisition de fournitures de b Request for Quota Single Stage - One E Pending Impl IDA / 71920 t and Monitoring and Evaluat Post Limited 45,455.00 0.00 2023-05-10 2023-06-17 2023-07-01 ureau, consommables inform tions nvelope ementation ion atiques et produits d'entretie n BF-PRSS-362087-GO-RFQ / A Implementation Managemen cquisition du matériel inform Request for Quota Single Stage - One E Pending Impl IDA / 71920 t and Monitoring and Evaluat Post Limited 73,181.81 0.00 2023-05-30 2023-07-18 2023-09-16 atique au profit des stagiaire tions nvelope ementation ion s recrutés dans le cadre de I MCP et du PPR COVID 19 BF-PRSS-362088-GO-RFQ / A Implementation Managemen Request for Quota Single Stage - One E Pending Impl cquisition de logiciel tom2 m IDA / 71920 t and Monitoring and Evaluat Post Limited 35,387.12 0.00 2023-05-30 2023-07-07 2023-09-05 tions nvelope ementation onitoring au profit du PPR CO ion VID19 BF-PRSS-367739-GO-DIR / A cquisition de logistique roula Implementation Managemen nte : 11 véhicules Pick up po Direct - Internation Pending Impl IDA / 71920 t and Monitoring and Evaluat Post Direct Selection 1,137,436.00 0.00 2023-06-26 2023-07-03 2023-07-27 2024-05-22 ur les DS et DC, et 13 véhicul al ementation ion es 4x4 station wagon pour le s DRS pour les activités de su pervision et de terrain NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PRSS-202600-NC-RFQ / R éalisation de 30 spots et ém Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 64,090.00 999.20 Signed 2020-11-23 2020-12-23 2020-12-24 2021-01-30 2021-12-19 issions radio-télé sur la lutte nse tions nvelope et la prévention du COVID-19 et en langue BF-PRSS-202599-NC-RFQ / El aboration et reproduction de Emergency COVID-19 Respo Request for Quota Single Stage - One E IDA / 66380 Post Limited 17,245.00 16,481.66 Completed 2020-11-19 2022-01-13 2020-12-20 2022-03-20 2021-01-19 2022-07-27 supports de communication nse tions nvelope dans le cadre de la lutte cont re le COVID 19 BF-PRSS-280325-NC-RFQ / R éalisation de 30 spots et émi Emergency COVID-19 Respo Request for Quota Single Stage - One E Under Imple IDA / 66380 Post Limited 64,090.00 0.00 2022-03-02 2021-06-21 2022-03-17 2022-05-16 ssions radio-télé sur la lutte e nse tions nvelope mentation t la prévention du COVID-19 et en langue BF-PRSS-293777-NC-RFQ / C Implementation Managemen ouverture médiatique de la c Request for Quota Single Stage - One E IDA / 66380 t and Monitoring and Evaluat Post Limited 4,500.00 0.00 Completed 2022-05-21 2022-06-28 2022-06-12 2022-10-10 2022-12-16 érémonie de remise officielle tions nvelope ion des équipements acquis par l e PPR COVID_19 BF-PRSS-337427-NC-RFQ / R ecrutement d'une agence de Implementation Managemen communication pour assurer Request for Quota Single Stage - One E Pending Impl IDA / 66380 t and Monitoring and Evaluat Post Limited 45,455.00 0.00 2023-02-20 2023-03-24 2023-04-23 la visibilité du projet PPR CO tions nvelope ementation ion VID (gadgets, film document aire, publi reportage, couvert ure médiatique, etc.) BF-PRSS-328161-NC-DIR / Pa ramétrage et formation du p ersonnel d’un logiciel compta Implementation Managemen Pending Impl ble tom²pro, au profit du proj IDA / 71920 t and Monitoring and Evaluat Post Direct Selection Direct - National 12,650.00 0.00 2023-02-06 2023-02-08 2023-03-11 2024-04-04 ementation et de Préparation et de répon ion se au covid-19 (PPR-COVID-1 9) dans le cadre du financem ent additionnel BF-PRSS-336422-NC-RFQ / R ecrutement d'une agence de communication pour la mise Emergency COVID-19 Respo Request for Quota Single Stage - One E Pending Impl IDA / 71920 Post Limited 1,093,329.00 0.00 2023-02-27 2023-04-03 2024-07-16 en œuvre des activités de co nse tions nvelope ementation mmunication de la DPV dans cadre du déploiement du vac cin contre la COVID-19 BF-PRSS-351164-NC-DIR / D estruction des déchets bio m Emergency COVID-19 Respo Pending Impl IDA / 71920 Post Direct Selection Direct - National 145,454.54 0.00 2023-04-06 2023-04-09 2023-04-29 2024-06-29 édicaux issus des campagne nse ementation s de vaccination organisées par la DPV BF-PRSS-358560-NC-RFQ / E Implementation Managemen Request for Quota Single Stage - One E Pending Impl IDA / 71920 Post Limited 27,273.00 0.00 2023-05-10 2023-06-21 2023-07-05 ntretien et réparation véhicul t and Monitoring and Evaluat tions nvelope ementation es ion Page 4 BF-PRSS-358424-NC-DIR / Fo Implementation Managemen Pending Impl urniture de service d’assuran IDA / 71920 t and Monitoring and Evaluat Post Direct Selection Direct - National 27,273.00 0.00 2023-05-08 2023-05-13 2023-06-04 2024-05-29 ementation ce maladie. ion BF-PRSS-358432-NC-RFQ / P Implementation Managemen restation de pause-café et dé Request for Quota Single Stage - One E Pending Impl IDA / 71920 t and Monitoring and Evaluat Post Limited 90,909.09 0.00 2023-05-28 2023-07-02 2024-06-26 jeuner et location de salle rel tions nvelope ementation ion ative aux différentes rencont res CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PRSS-202405-CS-CQS / R Implementation Managemen Consultant Qualifi ecrutement d'un (e) Consulta IDA / 66380 t and Monitoring and Evaluat Post Limited 12,500.00 0.00 Completed 2020-11-06 2020-11-16 2020-11-09 2020-12-01 2020-11-16 2021-03-11 2020-11-30 2021-03-12 2021-11-25 2022-03-16 cation Selection nt (e) Expert (e) en développ ion ement social BF-PRSS-202597-CS-CQS / R ecrutement d'un consultant p Emergency COVID-19 Respo Consultant Qualifi our l’élaboration du Cadre de IDA / 66380 Post Limited 34,485.00 0.00 Completed 2020-11-16 2020-11-13 2020-11-21 2020-12-01 2020-11-26 2021-03-16 2020-12-08 2021-03-19 2021-01-07 2022-01-28 nse cation Selection gestion environnementale et sociale (CGES) du projet COV ID 19 BF-PRSS-205135-CS-CQS / R ecrutement d’un Consultant i ndividuel en vue de l’élabora Emergency COVID-19 Respo Consultant Qualifi tion du Plan de lutte contre l IDA / 66380 Post Limited 25,862.00 9,870.44 Completed 2020-11-25 2020-11-21 2020-12-02 2020-11-30 2020-12-16 2021-03-11 2020-12-30 2021-03-17 2021-01-29 2021-12-04 nse cation Selection es infections associées aux soin s et de gestion des déchets b iomédicaux (PLIGD) BF-PRSS-307316-CS-CQS / R ecrutement d'un consultant p Implementation Managemen Consultant Qualifi Under Implement our la révision du manuel de IDA / 66380 t and Monitoring and Evaluat Post Limited 17,300.00 0.00 2022-08-08 2022-09-15 2022-08-15 2022-10-18 2022-08-22 2022-10-24 2022-09-04 2022-10-04 cation Selection ation procédure du PPR COVID-19 ion dans le cadre du financemen t additionnel BF-PRSS-307318-CS-LCS / R ecrutement d’un cabinet pou r l’audit des comptes couvra Implementation Managemen nt la période (01/01/ 2022 au Quality And Cost- Under Implement IDA / 71920 t and Monitoring and Evaluat Post Open - National 54,600.00 0.00 2022-09-05 2022-10-25 2022-10-05 2023-01-18 2022-10-17 2022-11-16 2022-11-21 2022-12-01 2022-12-15 2024-06-29 31 décembre 2022, 01/01/20 Based Selection ation ion 23 au 31/12/2023 et du 01/0 1/2024 au 29/06/22024) du P rojet de préparation et de ré ponse au COVID-19 au Burkin a Faso. BF-PRSS-295246-CS-CQS / R Implementation Managemen Consultant Qualifi ecrutement d'un consultant e IDA / 66380 t and Monitoring and Evaluat Post Limited 10,345.00 0.00 Canceled 2022-05-23 2022-05-19 2022-05-26 2022-05-29 2022-06-04 2022-11-01 cation Selection n sauvegarde sociale ion BF-PRSS-265243-CS-CQS / R éalisation des audits environ Emergency COVID-19 Respo Consultant Qualifi IDA / 66380 Post Open - National 51,724.00 0.00 Canceled 2021-12-13 2022-03-18 2022-01-12 2022-02-13 2022-02-15 2022-02-22 2022-05-23 nementaux dans les établiss nse cation Selection ements de santé INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PRSS-174782-CS-CDS / R ecrutement d'un consultant Implementation Managemen pour l'élaboration du manuel IDA / 66380 t and Monitoring and Evaluat Post Direct Selection Direct 8,621.00 11,736.98 Completed 2020-05-30 2020-08-19 2020-06-05 2020-07-09 2020-06-22 2020-10-01 2020-07-22 2021-06-11 de procédure de gestion pour ion le projet de préparation et de riposte au COVID 19 BF-PRSS-195071-CS-CDS / R ecrutement d’un cabinet pou r l’audit des comptes couvra Implementation Managemen nt la période du 03/06/2020- IDA / 66380 t and Monitoring and Evaluat Post Direct Selection Direct 22,217.00 20,700.85 Completed 2020-10-26 2020-10-20 2020-11-05 2020-10-29 2020-11-22 2021-01-05 2022-11-22 31/12/ 2020, 01/01/ 2021 à 3 ion 1/12/2021 et 01/01/2022 au 29/04/2022 de l’Unité de Ges tion du Projet de préparation et de réponse au COVID-19 a u Burkina Faso BF-PRSS-285824-CS-CDS / R ecrutement d’un Consultant i ndividuel en vue de la révisio n du Plan de lutte contre les i Emergency COVID-19 Respo nfections et de gestion des d IDA / 66380 Post Direct Selection Direct 30,000.00 2,061,818.25 Completed 2022-03-28 2022-03-31 2022-04-01 2022-03-09 2022-04-06 2022-06-17 2022-04-27 2022-07-30 nse échets (PLIGD) et du Cadre d e Gestion Environnementale et Sociale (CGES) dans le cad re du financement additionne l du PPR COVID-19 Page 5 PROCUREMENT PLAN (Textual Part) Project Country: Kyrgyz Republic information Full Project Name: Second Regional Economic Development Project (RED-2) Total Finance ($): USD 50,000,000 Project Number: P175587 Project Implementation agency Community Development and Investment Agency of the Kyrgyz Republic (ARIS) Date of the Procurement Plan January 20, 2022 Period covered by this Procurement January 2022 – December 2027 Plan: Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), procurement under World Bank financed operations may be carried out in accordance with “Request for quotations” and “Unlimited” methods set forth in the Public Procurement Law of the Kyrgyz Republic № 27 dated of April 14, 2022 (the “PPL”) provided that such arrangements continue to meet requirements of the paragraph 5.4 of the Procurement Regulations and the following conditions: • The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. • Bidding documents, including contract forms, acceptable to the Bank shall be used. Bidding documents shall include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social, health and safety (“ESHS”) risks and impacts. • The Bidding process shall not be cancelled solely on the reason that minimum bid price is larger than the amount allocated by procuring entity for the procurement. • There shall be no preference applied during procurement of goods and works. • Implementing agency shall have an option to publish procurement notice without disclosing cost estimate. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Other national procurement arrangements such as “Request for Quotation” may be applied on the same conditions stated above for procuring limited quantities of readily available off-the-shelf goods or simple civil works of small value. In addition, not less than three quotations shall be requested to ensure competition. In accordance with Bank’s Guidance “Thresholds for procurement approaches and methods by country” procurement of goods with a budget below USD 1,000,000 is carried out using the RFB method and aiming international or national markets, using standard documents of the World Bank or National Procurement Procedures based on the analysis of the market and justification in PPSD and PP. International market approach can be used when local market is of low capacity to produce or supply required goods or equipment. Procurement of works with a budget of more than $200,000 and below USD 5,000,000 shall be carried out using RFB method and WB SPD Small Works of the World Bank. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable; Works: is not applicable. PROCUREMENT Kyrgyz Republic : Second Regional Economic Development Project PLAN General Information Country: Kyrgyz Republic 2022-10-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175587 GPN Date: 2022-11-04 Project Name: Second Regional Economic Development Project Loan / Credit No: IDA / 70490 Community Development and Investment Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ARIS-IDA-RED2-CW-RFB-202 Component 1: Supporting m 3-1 / Construction of social in unicipal infrastructure, basic Open - Internationa Single Stage - One E Other (with field f Pending Imp 2023-11-0 frastructure (schools, kinderg IDA / 70490 Prior Request for Bids 6,500,000.00 0.00 2023-01-15 2023-01-20 2023-03-03 2023-04-02 2023-05-07 public services, and capacity l nvelope or explanation) lementation 3 artens, FAPs, etc. facilities fo building r the cities of Batken, Kadam zhai, Razzakov) ARIS-IDA-RED2-CW-RFB-202 Component 1: Supporting m 3-2 / Construction of roads, p unicipal infrastructure, basic Open - Internationa Single Stage - One E Other (with field f Pending Imp 2023-11-0 edestrian bridges, street ligh IDA / 70490 Prior Request for Bids 7,000,000.00 0.00 2023-01-15 2023-01-20 2023-03-03 2023-04-02 2023-05-07 public services, and capacity l nvelope or explanation) lementation 3 ting and other facilities for B building atken,Kadamzhai, Razzakov) ARIS-IDA-RED2-CW-RFB-202 Component 1: Supporting m 3-3 / Rehabilitation of the wa unicipal infrastructure, basic Open - Internationa Single Stage - One E Other (with field f Pending Imp 2023-11-0 IDA / 70490 Prior Request for Bids 5,000,000.00 0.00 2023-01-15 2023-01-20 2023-03-03 2023-04-02 2023-05-07 ter supply system in Batken, public services, and capacity l nvelope or explanation) lementation 3 Razzakov, Kadamzhai building ARIS-IDA-RED2-CW-RFB-202 Component 1: Supporting m 3-4 / Repair work on the rest unicipal infrastructure, basic Single Stage - One E Other (with field f Pending Imp 2023-11-0 oration of sewerage and sew IDA / 70490 Post Request for Bids Open - National 3,521,765.00 0.00 2023-01-15 2023-01-20 2023-03-03 2023-04-02 2023-05-07 public services, and capacity nvelope or explanation) lementation 3 age treatment plants in Batk building en, Razzakov,Kadamzhai ARIS-IDA-RED2-CERC-CW-RF Request for Bids - Component 4: Contingent E B-2023-3 / Capital repairs of f Single Stage - One E Small Works SPD Under Imple 2023-08-2 IDA / 70490 mergency Response Compo Post Request for Bids Open - National 753,003.00 0.00 2022-11-03 2022-11-11 2022-11-08 2022-11-11 2022-12-20 2022-11-24 2023-01-19 2023-02-23 acilities in Leilek region: Lot nvelope (1 envelope proce mentation 2 nent (CERC) #1, Lot #2, Lot #3 ss) ARIS-IDA-RED2-CERC-CW-RF Request for Bids - Component 4: Contingent E B-2023-1 / Construction work Single Stage - One E Small Works SPD Under Imple 2023-06-1 IDA / 70490 mergency Response Compo Post Request for Bids Open - National 1,390,900.00 0.00 2022-11-14 2022-11-18 2022-11-15 2022-11-20 2022-11-29 2022-12-06 2022-12-01 2022-12-15 of facilities in Batken region: nvelope (1 envelope proce mentation 3 nent (CERC) Lot #1- 1 facility , Lot #2- 1 f ss) acility ARIS-IDA-RED2-CERC-CW-RF Request for Bids - Component 4: Contingent E B-2023-2 / Construction work Single Stage - One E Small Works SPD Under Imple 2023-09-1 IDA / 70490 mergency Response Compo Post Request for Bids Open - National 2,516,250.00 0.00 2022-12-01 2022-12-02 2022-12-02 2022-12-03 2023-01-13 2023-02-12 2023-03-19 s of facilities of Ak-Sai aiyl ai nvelope (1 envelope proce mentation 5 nent (CERC) mak in Batken region ss) Request for Bids - ARIS-IDA-RED2-CERC-CW-RF Component 4: Contingent E Single Stage - One E Small Works SPD Pending Imp 2023-08-0 B-2023-4 / Construction work IDA / 70490 mergency Response Compo Post Request for Bids Open - National 2,655,576.00 0.00 2022-12-30 2023-01-03 2023-01-17 2023-01-21 2023-02-04 nvelope (1 envelope proce lementation 3 s of facilities in Batken region nent (CERC) ss) . ARIS-IDA-RED2-CERC-CW-RF Request for Bids - Component 4: Contingent E B-2023-5 / Construction work Single Stage - One E Small Works SPD Pending Imp 2023-10-1 IDA / 70490 mergency Response Compo Post Request for Bids Open - National 1,234,273.00 0.00 2022-12-30 2023-01-04 2023-02-15 2023-03-17 2023-04-21 s of facilities of Ak-Sai aiyl ai nvelope (1 envelope proce lementation 8 nent (CERC) mak in Batken region. ss) ARIS-IDA-RED2-CERC-CW-RF B-2023-1-2-RT / Construction Request for Bids - Component 4: Contingent E works of the additional schoo Single Stage - One E Small Works SPD Pending Imp 2023-09-0 IDA / 70490 mergency Response Compo Post Request for Bids Open - National 747,875.00 0.00 2022-12-15 2022-12-16 2022-12-30 2023-01-29 2023-03-05 l building of the school name nvelope (1 envelope proce lementation 1 nent (CERC) d after A. Masaliev in Kyzyl-B ss) el village, Kara-Bak aiyl aima k, Batken district ARIS-IDA-RED2-CERC-CW-RF Request for Bids - B-2023-2-2-RT / Construction Component 4: Contingent E Single Stage - One E Small Works SPD Pending Imp 2023-10-0 works of secondary school Kh IDA / 70490 mergency Response Compo Post Request for Bids Open - National 1,794,594.00 0.00 2022-12-22 2022-12-23 2023-02-03 2023-03-05 2023-04-09 nvelope (1 envelope proce lementation 6 odzhaev in Ak-Sai village of A nent (CERC) ss) k-Sai ayyl aimag, Batken regi on. ARIS-IDA-RED2-CERC-CW-RF Request for Bids - Component 4: Contingent E B-2023-4-2-RT / Construction Single Stage - One E Small Works SPD Pending Imp 2024-04-1 IDA / 70490 mergency Response Compo Post Request for Bids Open - National 1,527,978.00 0.00 2023-03-06 2023-03-10 2023-03-24 2023-03-28 2023-04-11 of school in the village of Cho nvelope (1 envelope proce lementation 0 nent (CERC) n-Talaa, Tort-Gul aiyl aimak, ss) Batken district Request for Bids - ARIS-IDA-RED2-CERC-CW-RF Component 4: Contingent E Single Stage - One E Small Works SPD Pending Imp 2024-04-1 B-2023-4-1-RT / Construction IDA / 70490 mergency Response Compo Post Request for Bids Open - National 927,500.00 0.00 2023-03-06 2023-03-10 2023-03-24 2023-03-28 2023-04-11 nvelope (1 envelope proce lementation 0 works of facilities in Batken r nent (CERC) ss) egion 3 Lots. ARIS-IDA-RED2-CERC-CW-RF Request for Bids - Component 4: Contingent E B-2023-5-1-RT / Construction Single Stage - One E Small Works SPD Pending Imp 2024-04-1 IDA / 70490 mergency Response Compo Post Request for Bids Open - National 1,183,750.00 0.00 2023-03-06 2023-03-10 2023-03-24 2023-03-28 2023-04-11 of Elementary school in Kok- nvelope (1 envelope proce lementation 0 nent (CERC) Tash village, Ak-Sai aiyl aima ss) k, Batken district. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ARIS-IDA-RED2-G-RFB-2023- Component 1: Supporting m 1 / Procurement of special eq unicipal infrastructure, basic Single Stage - One E Pending Impl IDA / 70490 Post Request for Bids Open - National 572,590.00 0.00 2023-01-15 2023-01-20 2023-03-03 2023-04-02 2023-05-07 2023-11-03 uipment and waste container public services, and capacity nvelope ementation s for Kadamjai, Razzakov ,Ba building tken cities ARIS-IDA-RED2-G-RFB-2023- 2 / Purchase of laboratory eq uipment and other material a nd technical means necessar Component 2: Strengthening Open - Internationa Single Stage - One E Pending Impl y for the laboratory (Soil and IDA / 70490 Post Request for Bids 1,342,000.00 0.00 2023-01-15 2023-01-20 2023-03-03 2023-04-02 2023-05-07 2023-11-03 Agriculture Competitiveness l nvelope ementation Agrochemical stations, Depar tment of Crop Expertise, Dep artment of Plant Protection a nd Chemicalization, Veterinar y and Phytosanitary Safety In s Page 1 ARIS-IDA-RED2-G-RFB-2023- 3 / Purchase of equipment fo r creating logistics centers, e Component 2: Strengthening Open - Internationa Single Stage - One E Pending Impl quipment for drip irrigation, IDA / 70490 Prior Request for Bids 8,735,000.00 0.00 2023-01-15 2023-01-20 2023-03-03 2023-04-02 2023-05-07 2023-11-03 Agriculture Competitiveness l nvelope ementation equipment or goods for proc essing and packaging of agri cultural products, constructio n of irrigation canals, etc. ARIS-IDA-RED2-CERC-G-RFQ- 2023-2 / Equipping schools, p aramedic and midwife statio Component 4: Contingent E Request for Quota Single Stage - One E Pending Impl ns, family physician groups i IDA / 70490 mergency Response Compo Post Open - National 200,000.00 0.00 2023-01-17 2023-03-14 2023-09-10 tions nvelope ementation n Batken and Leilek districts nent (CERC) (computer equipment, sports equipment, furniture, applian ces, medical equipment): 5 L ots NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ARIS-IDA-RED2-CS-QCBS-20 Component 1: Supporting m 23-2 / Consulting services for unicipal infrastructure, basic Quality And Cost- Open - Internationa Pending Impleme IDA / 70490 Post 480,000.00 0.00 2023-01-15 2023-02-05 2023-03-21 2023-04-18 2023-05-18 2023-06-22 2023-07-27 2024-07-26 technical supervision for Bat public services, and capacity Based Selection l ntation ken,Kadamjai,Razzakov cities building (Multiple contracts) ARIS-IDA-RED2-CS-QCBS-20 Component 1: Supporting m 23-3 / Consulting services for unicipal infrastructure, basic Quality And Cost- Open - Internationa Pending Impleme IDA / 70490 Post 445,645.00 0.00 2023-01-15 2023-02-05 2023-03-21 2023-04-18 2023-05-18 2023-06-22 2023-07-27 2024-07-26 Author supervision for Batke public services, and capacity Based Selection l ntation n,Kadamjai,Razzakov cities ( building Multiple contracts) ARIS-IDA-RED2-CS-QCBS-20 23-6 / Consulting company fo r feasibilty studies for SPS in Component 2: Strengthening Quality And Cost- Open - Internationa Pending Impleme IDA / 70490 Post 340,000.00 0.00 2023-01-15 2023-02-05 2023-03-21 2023-04-18 2023-05-18 2023-06-22 2023-07-27 2024-07-26 vestments and design of tec Agriculture Competitiveness Based Selection l ntation hnical specifications for equi pment of laboratories, center s and points ARIS-IDA-RED2-CS-QCBS-20 23-7 / Consulting company th at will assist ARIS in informin Component 3: Promoting loc g community mobilizing, trai al economic development th Quality And Cost- Open - Internationa Pending Impleme IDA / 70490 Prior 500,000.00 0.00 2023-01-15 2023-02-05 2023-03-21 2023-04-18 2023-05-18 2023-06-22 2023-07-27 2024-07-26 ning potential grant recipient rough the Small Grants Prog Based Selection l ntation s, supporting in the preparati ram on of the applications and ot her issues associated with th e implementation of the SGP. ARIS-IDA-RED2-CS-LCS-2023 Component 5: Operational S Least Cost Selecti Open - Internationa Pending Impleme IDA / 70490 Post 100,000.00 0.00 2023-01-15 2023-02-05 2023-03-21 2023-04-18 2023-05-18 2023-06-22 2023-07-27 2024-01-23 -8 / Project audit (financial au upport on l ntation dit) ARIS-IDA-RED2-CS-CQS-2 / D rip irrigation/groundwater fea Component 2: Strengthening Consultant Qualifi Open - Internationa IDA / 70490 Post 50,000.00 0.00 Canceled 2023-01-15 2023-02-05 2023-03-21 2023-04-20 2023-05-25 2023-11-21 sibility study to guide invest Agriculture Competitiveness cation Selection l ments in drip irrigation ARIS-IDA-RED2-CS-CQS-3 / P PP feasibility assessment for Component 2: Strengthening Consultant Qualifi Open - Internationa IDA / 70490 Post 150,000.00 0.00 Canceled 2023-01-15 2023-02-05 2023-03-21 2023-04-20 2023-05-25 2023-11-21 potential trade and logistics Agriculture Competitiveness cation Selection l centers on MoA owned sites i n Batken region ARIS-IDA-RED2-CS-CQS-4 / C onsulting company to identif Component 2: Strengthening Consultant Qualifi Open - Internationa y specific supply chain actors IDA / 70490 Post 250,000.00 0.00 Canceled 2023-01-15 2023-02-05 2023-03-21 2023-04-20 2023-05-25 2023-11-21 Agriculture Competitiveness cation Selection l for participation and the com petitive selection of sub-proj ects ARIS-IDA-RED2-CS-QCBS-20 23-4 / Consulting company pr Component 2: Strengthening Quality And Cost- Open - Internationa Pending Impleme oviding training and advice t IDA / 70490 Post 161,000.00 0.00 2023-01-15 2023-02-05 2023-03-21 2023-04-18 2023-05-18 2023-06-22 2023-07-27 2024-07-26 Agriculture Competitiveness Based Selection l ntation o members of productive par tnerships for productivity, qu ality, marketing and sales ARIS-IDA-RED2-CS-CQS-1 / C onducting a study of a compr ehensive assessment of the l Component 2: Strengthening Consultant Qualifi Under Implement ocal economic situation, com IDA / 70490 Post Open - National 100,000.00 0.00 2022-11-21 2022-12-16 2022-12-12 2022-12-27 2023-01-25 2023-02-24 2023-03-31 2023-09-27 Agriculture Competitiveness cation Selection ation petitiveness of agribusiness with the purpose to build val ue chains and create product ive partnerships in Batken ob last ARIS-IDA-RED2-CERC-CS-CQ S-2023-2 / Development of th Component 4: Contingent E Consultant Qualifi Under Implement e detailed design packages a IDA / 70490 mergency Response Compo Post Open - National 200,000.00 0.00 2022-11-21 2022-11-22 2022-12-01 2022-11-23 2023-01-14 2023-02-13 2023-03-20 2023-09-16 cation Selection ation nd carrying out Author Super nent (CERC) vision in facilities in the Batk en region ARIS-IDA-RED2-CERC-CS-CQ Component 4: Contingent E S-2023-1 / Technical Supervi Consultant Qualifi IDA / 70490 mergency Response Compo Post Open - National 295,000.00 0.00 Canceled 2022-11-14 2022-12-05 2023-01-18 2023-02-17 2023-03-24 2023-09-20 sion of Civil Works under the cation Selection nent (CERC) RED-2 for Component 4. ARIS-IDA-RED2-CS-QCBS-20 Component 1: Supporting m 23-1 / Consulting services for unicipal infrastructure, basic Quality And Cost- Open - Internationa Development of design and e IDA / 70490 Post 480,000.00 0.00 Canceled 2023-01-15 2023-02-05 2023-03-21 2023-04-18 2023-05-18 2023-06-22 2023-07-27 2024-07-26 public services, and capacity Based Selection l stimate documentation for B building atken,Kadamjai, Razzakov cit ies (Multiple contracts) ARIS-IDA-RED2-CS-CQS-6 / C onsulting services for Develo Component 1: Supporting m pment of the detailed design unicipal infrastructure, basic Consultant Qualifi Under Implement IDA / 70490 Post 200,000.00 0.00 2023-02-01 2023-02-20 2023-02-22 2023-02-21 2023-04-07 2023-05-07 2023-06-11 2023-12-08 packages and author supervi public services, and capacity cation Selection ation sion for the selected social fa building cilities in the Batken, Kadamj ay and Razzakov cities Page 2 ARIS-IDA-RED2-CS-CQS-8 / C onsulting services for Develo Component 1: Supporting m pment of the detailed design unicipal infrastructure, basic Consultant Qualifi Open - Internationa Under Implement IDA / 70490 Post 200,000.00 0.00 2023-02-01 2023-02-20 2023-02-22 2023-02-21 2023-04-07 2023-05-07 2023-06-11 2023-12-08 packages and author supervi public services, and capacity cation Selection l ation sion for the asphalting of inte building rnal roads in the Batken and Kadamjay and Razzakov citie s ARIS-IDA-RED2-CS-CQS-7 / C onsulting services for Develo Component 1: Supporting m pment of the detailed design unicipal infrastructure, basic Consultant Qualifi Under Implement packages and author supervi IDA / 70490 Post Open - National 50,000.00 0.00 2023-02-01 2023-04-13 2023-02-22 2023-05-23 2023-04-07 2023-05-07 2023-06-11 2023-12-08 public services, and capacity cation Selection ation sion for the construction of 2 building reservoirs and laying drinkin g water pipes in the Batken a nd Kadamjay cities ARIS-IDA-RED2-CS-CQS-5 / C onsulting services to develop the package of detailed desig Component 1: Supporting m n and author supervision at t unicipal infrastructure, basic Consultant Qualifi Under Implement IDA / 70490 Post Open - National 30,000.00 0.00 2023-02-01 2023-02-06 2023-02-22 2023-02-15 2023-04-07 2023-05-07 2023-06-11 2023-12-08 he selected facilities: public services, and capacity cation Selection ation ∙Zhenish Park in Batken city; building ∙Zhashtyk Park in Batken cit y; ∙Alleyka square in Kadamjay ARIS-IDA-RED2-CS-QCBS-20 city. 22-5 / Conducting an informa tion campaign, social mobiliz Component 2: Strengthening Quality And Cost- Open - Internationa Under Implement ation and diagnostics to build IDA / 70490 Post 352,000.00 0.00 2023-05-02 2023-05-02 2023-05-23 2023-05-23 2023-07-06 2023-08-03 2023-09-02 2023-10-07 2023-11-11 2024-11-10 Agriculture Competitiveness Based Selection l ation value chains and create prod uctive partnerships in the Bat ken region and their further development INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ARIS-IDA-RED2-CS-IC-2023-1 0 / Independent consultant o Component 2: Strengthening Individual Consult Pending Impleme IDA / 70490 Post Open - National 10,000.00 0.00 2023-01-15 2023-03-05 2023-03-26 2023-04-30 2023-10-27 n evaluation of business plan Agriculture Competitiveness ant Selection ntation s and Sub-project proposals ARIS-IDA-RED2-CERC-CS-SSS -2023-2 / Preparation of a D Component 4: Contingent E esign Estimate Documentatio IDA / 70490 mergency Response Compo Post Direct Selection Direct - National 200,000.00 0.00 Canceled 2022-11-14 2022-11-15 2022-11-16 2022-12-28 n (DED) packages and author nent (CERC) 's supervision of facilities in t he Batken region. ARIS-IDA-RED2-CERC-CS-IC- 2023-1 / Individual Consultan Component 4: Contingent E Individual Consult Under Implement t for Technical Supervision of IDA / 70490 mergency Response Compo Post Open - National 20,000.00 0.00 2022-11-25 2022-12-16 2023-01-13 2023-02-03 2023-03-10 2023-09-06 ant Selection ation construction works under the nent (CERC) RED -2 for Component 4: 3 fa cilities ARIS-IDA-RED2-CERC-CS-IC- 2023-2 / Individual Consultan Component 4: Contingent E Individual Consult Under Implement t for Technical Supervision of IDA / 70490 mergency Response Compo Post Open - National 20,000.00 0.00 2022-11-25 2022-12-15 2023-01-13 2023-02-03 2023-03-10 2023-09-06 ant Selection ation construction works under the nent (CERC) RED -2 for Component 4: 2 f acilities ARIS-IDA-RED2-CERC-CS-IC- 2023-3 / Individual Consultan Component 4: Contingent E Individual Consult Under Implement t for Technical Supervision of IDA / 70490 mergency Response Compo Post Open - National 20,000.00 0.00 2022-12-01 2022-12-25 2023-01-19 2023-02-09 2023-03-16 2023-09-12 ant Selection ation construction works under the nent (CERC) RED -2 for Component 4: 3 fa cilities ARIS-IDA-RED2-CERC-CS-IC- 2023-4 / Individual Consultan Component 4: Contingent E Individual Consult Under Implement t for Technical Supervision of IDA / 70490 mergency Response Compo Post Open - National 20,000.00 0.00 2022-12-01 2022-12-25 2023-01-19 2023-02-09 2023-03-16 2023-09-12 ant Selection ation construction works under the nent (CERC) RED -2 for Component 4: 1 fa cility ARIS-IDA-RED2-CERC-CS-IC- 2023-5 / Individual Consultan Component 4: Contingent E Individual Consult Under Implement t for Technical Supervision of IDA / 70490 mergency Response Compo Post Open - National 20,000.00 0.00 2022-12-01 2022-12-23 2023-01-19 2023-02-09 2023-03-16 2023-09-12 ant Selection ation construction works under the nent (CERC) RED -2 for Component 4: 2 fa cilities ARIS-IDA-RED2-CERC-CS-IC- 2023-6 / Individual Consultan Component 4: Contingent E Individual Consult Under Implement t for Technical Supervision of IDA / 70490 mergency Response Compo Post Open - National 20,000.00 0.00 2022-12-01 2022-12-16 2023-01-19 2023-02-09 2023-03-16 2023-09-12 ant Selection ation construction works under the nent (CERC) RED -2 for Component 4: 2 fa cilities ARIS-IDA-RED2-CERC-CS-IC- 2023-7 / Individual Consultan Component 4: Contingent E Individual Consult Under Implement t for Technical Supervision of IDA / 70490 mergency Response Compo Post Open - National 20,000.00 0.00 2022-12-01 2022-12-23 2023-01-19 2023-02-09 2023-03-16 2023-09-12 ant Selection ation construction works under the nent (CERC) RED -2 for Component 4: 1 fa cility ARIS-IDA-RED2-CERC-CS-SSS -2023-4 / Author's supervisio n of construction of facilities: -Construction works Element Component 4: Contingent E Under Implement ary school in Kok-Tash villag IDA / 70490 mergency Response Compo Post Direct Selection Direct - National 20,500.00 0.00 2023-04-27 2023-05-07 2023-07-11 2024-07-10 ation e, Ak-Sai aiyl aimak, Batken nent (CERC) district -Construction works Kinderga rten ''Edelweiss'' in Ak-Sai vill age of Ak-Sai aiyl aimak of B atken district; ARIS-IDA-RED2-CERC-CS-SSS -2023-5 / Author's supervisio n of construction of facilities- Component 4: Contingent E Under Implement Construction works Additiona IDA / 70490 mergency Response Compo Post Direct Selection Direct - National 10,500.00 0.00 2023-04-27 2023-05-07 2023-07-11 2024-07-10 ation l school building of the secon nent (CERC) dary school named after B. N armatov in Kara-Bak village, Kara-Bak aiyl aimak, Batken district ARIS-IDA-RED2-CERC-CS-SSS -2023-6 / Author's supervisio n of construction of facilities- Component 4: Contingent E Under Implement Construction works additiona IDA / 70490 mergency Response Compo Post Direct Selection Direct - National 10,500.00 0.00 2023-04-27 2023-05-07 2023-07-11 2024-07-10 ation l school building of the schoo nent (CERC) l named after A. Masaliev in Kyzyl-Bel village, Kara-Bak ai yl aimak, Batken district Page 3 ARIS-IDA-RED2-CERC-CS-SSS -2023-7 / Author's supervisio Component 4: Contingent E n of construction of facilities- Under Implement IDA / 70490 mergency Response Compo Post Direct Selection Direct - National 10,500.00 0.00 2023-04-27 2023-05-05 2023-05-07 2023-07-11 2024-07-10 construction works of second ation nent (CERC) ary school Khodzhaev in Ak-S ai village of Ak-Sai aiyl aimak , Batken region ARIS-IDA-RED2-CERC-CS-SSS Component 4: Contingent E Under Implement -2023-8 / Author Supervision IDA / 70490 mergency Response Compo Post Direct Selection Direct - National 40,000.00 0.00 2023-05-04 2023-05-14 2023-07-18 2024-07-17 ation on five facilities in the Batke nent (CERC) n region ARIS-IDA-RED2-CS-IC-2023-1 / Individual consultant to ass Component 2: Strengthening Individual Consult Under Implement es the technical condition of IDA / 70490 Post Open - National 50,000.00 0.00 2023-05-16 2023-06-15 2023-07-04 2023-07-25 2023-08-29 2023-11-27 Agriculture Competitiveness ant Selection ation buildings and premises of lab oratory infrastructure and ser vices ARIS-IDA-RED2-CS-IC-2023-2 / Individual consultant to dev elop a feasibility study for inv estments infrastructure and s Component 2: Strengthening Individual Consult Under Implement IDA / 70490 Post Open - National 50,000.00 0.00 2023-05-16 2023-06-15 2023-07-04 2023-07-25 2023-08-29 2023-11-27 ervices related to the safety Agriculture Competitiveness ant Selection ation and quality functions of agric ultural and food products to s trengthen the capacity of san itary and phytosanitary (SPS) control ARIS-IDA-RED2-CS-IC-2023-3 / Individual consultant to stu dy the rules and regime of ex Component 2: Strengthening Individual Consult Under Implement port regulation and certificati IDA / 70490 Post Open - National 50,000.00 0.00 2023-05-16 2023-06-15 2023-07-04 2023-07-25 2023-08-29 2023-11-27 Agriculture Competitiveness ant Selection ation on of products aimed at incre asing the competitiveness of agricultural business in the B atken region Page 4 Plan de Passation des Marchés Fonds d’avance de préparation du Projet de Promotion de l’Emploi et de la Transformation Économique (PPET) – P172425 I. Généralités 1. Information sur le projet : Pays : Côte d’Ivoire Emprunteur : Ministère de l’Economie et des Finances Nom du Projet : Projet de Promotion de l’Emploi et de la Transformation Économique (PPET) Numéro du Crédit : Unité de Gestion du Projet : FIRCA (Agent fiduciaire) 2. Date d'approbation du plan de passation de marchés : 7 Septembre 2020 3. Date de Publication de l'avis Général de Passation de Marchés : ……. 4. Période couverte par le Plan de passation de marchés : Septembre 2020 à Mai 2021 1 I. Sélection de Consultants a. Seuil d’examen préalable Les contrats qui seront soumis à l'examen préalable de la Banque conformément aux dispositions de l'Annexe 1 des Directives de Sélection et Emploi de Consultants de janvier 2011 révisées en juillet 2014: Nature de Méthode de passation de Valeur Contrats soumis à dépenses marchés seuil du examen préalable contrat $EU Consultant SFQC1, SFQ2, SMC3, SCBD4, ≥ 300.000 Tout contrat de 2.000.000 s $EU ou plus SFQC, SFQ, SMC, SCBD, QC5 < 300.000 Firmes Contrat ≥ 2 000000 $EU Entente directe (*) Pas de seuil Consultant Consultant individuel (AMI) ≥ 100.000 s Tout contrat de 400.000 $ EU ou plus Individuels Consultant individuel (3 CV) < 100.000 Entente directe (*) Pas de seuil Contrat ≥ 400,000 $EU Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. (*) Le justificatif de toute sélection par entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM 1 SFQC : Sélection Fondée sur la Qualité et le Coût 2 SFQ : Sélection fondée sur la qualité 3 SMC : Sélection au moindre coût 4 SCBD : Sélection dans le cadre d’un budget déterminé 5 QC : Sélection basée sur les Qualifications des Consultants CI : Consultant Individuel : AMI : Avis à Manifestation d’Intérêt 2 1.2 Marchés, planning et Méthodes de Passation 1.2.1 Marchés Services de consultants Montant Examen Date Date Commentaires estimatif en Méthod préalable préparation prévue Ré $US e de de la soumission soumissio f sélectio Banque (à ou TDR n et Description du contrat No n priori / à (Mois/Jour/A ouverture . postériori n) propositio ) ns Consultants Recrutement d'un cabinet pour réaliser l'étude de faisabilité sur un Centre 1 $ 250,000.00 QC (AMI) A posteriori 12/1/2020 1/10/2021 TDR disponibles Technologique pour l'ingénierie légère (générale) Recrutement d'un cabinet pour la mise en place des Procédures opérationnelles Exemple de TDR 2 standard ("Standard Operating Procedures") $ 250,000.00 QC (AMI) A posteriori 11/1/2020 12/1/2020 disponibles, à pour le service logistique à temperature personnaliser. controllé pour la mangue et ? Recrutement d'un cabinet pour réaliser le 3 $ 80,000.00 QC (AMI) A posteriori 12/1/2020 1/10/2021 TDR à développer diagnostique de la chaine frigorifique en CIV Recrutement d'un cabinet pour elaborer Train the trainers online courses pour les $ Beneficiaire: 4 QC (AMI) A posteriori 10/25/2020 11/15/2020 superviseurs (DRSSFD) + on-the -job 150,000.00 DRSSFD/MEF training Recrutement d'un consultant en charge de la mise a jour du cadre règlementaire des 5 $ 60,000.00 CI (3 CV) A posteriori 10/15/2020 11/5/2020 institutions de microfinance (approche par les risques) Recrutement d'un consultant pour accelerer les reformes dans le secteur des institutions 6 de microfinance (sur la base des actions $ 50,000.00 CI (3 CV) A posteriori 10/2/2020 10/30/2020 identifiees dans la Strategie d'Inclusion Financiere) Recrutement d'un cabinet en charge 7 d'évaluer les besoins des IMF en MCBS $ 120,000.00 QC (AMI) A posteriori 10/5/2020 10/25/2020 (inclut préparation de RFP) Recrutement d'un cabinet pour l'évaluation de la demande afin d'évaluer la réserve potentielle de PME éligibles à ce type de 8 $ 150,000.00 QC (AMI) A posteriori 9/25/2020 10/20/2020 financement dans le cadre du Plate-forme de marché numérique pour les prêts aux PME. Recrutement d'un consultant pour le benchmark des modèles d'affaires des 9 différentes plateformes de financement $ 50,000.00 CI (3 CV) A posteriori /3/2020 8/31/2020 numérique pour les prêts aux MPMEs dans le monde Recrutement d'un consultant pour faire un exercice de bilan sur les services à valeur ajoutée qui sont / peuvent être associés aux plateformes (examen des demandes de prêt, mécanismes d'amélioration du crédit, 10 notation des PME, formation des $ 50,000.00 CI (3 CV) A posteriori 8/3/2020 8/31/2020 entreprises, cours de fin d'études, etc.) dans le cadre de la Plate-forme de marché numérique pour les prêts aux PME Recrutement d'un consultant (analyste financier) pour la réalisation des simulations 11 $ 30,000.00 CI (3 CV) A posteriori 9/20/2020 10/15/2020 financières pro forma dans le cadre de la mise en place du FoF Recrutement d'un consultant individuel en $ 12 charge d'assister le directeur du FoF CI (3 CV) A posteriori 3/1/2021 3/20/2021 10,000.00 (executive assistante) Recrutement dun consultant individuel en 13 $ 48,000.00 CI (3 CV) A posteriori 3/1/2021 3/20/2021 charge de la direction du fond de fonds Recrutement d'un consultant individuel 14 expert juridique pour la mise en place du $ 32,000.00 CI (3 CV) A posteriori 3/1/2021 3/20/2021 FoF Recrutement d'un consultant individuel 15 senior chargé d' investissement pour la $ 32,000.00 CI (3 CV) A posteriori 3/1/2021 3/20/2021 mise en place du FoF Recutement d'un consultant individuelle en 16 $ 40,000.00 CI (3 CV) A posteriori 3/1/2021 3/20/2021 charge de la gestion de la SIPROFI Recrutement d'un consultant individuel pour 17 $ 10,000.00 CI (3 CV) A posteriori 3/1/2021 3/20/2021 assister le gerant de la SIPROFI Recrutement d'un consultant spécialiste de l’évaluation des besoins financiers en fonds 18 $ 50,000.00 CI (3 CV) A posteriori 10/1/2020 10/20/2020 propres et en dette des entreprises en période de reprise post-crise Recrutement d'un consultant spécialiste de l’évaluation des besoins financiers en fonds 19 propres et en dette des entreprises et des $ 50,000.00 CI (3 CV) A posteriori 10/1/2020 10/20/2020 sociétés ad-hoc de PPP dans le cadre de la croissance verte Recrutement d'un conseiller juridique pour 20 revoir les documents legaux (statuts etc.. ) $ 50,000.00 CI (3 CV) A posteriori 10/1/2020 10/20/2020 dans le cadre de la mise en place du FSI Recrutement d'un expert en analyse 21 économique des projets dans le cadre de la $ 50,000.00 CI (3 CV) A posteriori 9/20/2020 10/10/2020 mise en place du FSI Recrutement d'experts spécialistes Recrutement de 22 sectoriels dans le cadre de la mise en place $ 30,000.00 CI (3 CV) A posteriori 10/12/2020 11/10/2020 10 experts du FSI sectoriels Recrutement d'un analyste financier pour le $ 23 CI (3 CV) A posteriori 10/2/2020 10/30/2020 FoF et le FSI 30,000.00 Recrutement d'une assistance du Fonds 24 Stratégique d'Investissement (FSI) $ 10,000.00 CI (3 CV) A posteriori 10/2/2020 10/30/2020 (executive assistante) 25 Recrutement du directeur du FSI $ 48,000.00 CI (3 CV) A posteriori 9/20/2020 10/15/2020 26 Recrutement d'un expert juridique du FSI $ 32,000.00 CI (3 CV) A posteriori 9/15/2020 9/30/2020 Recrutement d'un chargé senior en 27 $ 32,000.00 CI (3 CV) A posteriori 10/15/2020 11/5/2020 investissement du FSI Recrutement d'un consultant pour faire une CI (3 28 étude sur la gouvernance et la gestion des $ 75,000.00 A posteriori 10/8/2020 10/30/2020 zones industrielles en Côte d'Ivoire CV) Recrutement d'un consultant pour faire une 29 étude sur les Partenariats Publics-Privé $ 45,000.00 CI (3 A posteriori 10/10/2020 10/11/2020 (PPP) CV) Recrutement d'un consultant pour examiner 30 $ 30,000.00 CI (3 A posteriori 10/9/2020 10/10/2020 l'état actuel de la livraison des conteneurs CV) Recrutement d'un consultant pour faire une 31 étude sur la mise en œuvre du cadre légal $ 30,000.00 CI (3 A posteriori 11/1/2020 11/30/2020 des sociétés coopératives CV) Recrutement de 4 Consultants Individuel - 32 $ 180,000.00 CI 3 (CV) A posteriori 8/10/2020 9/7/2020 Specialistes de Cluster Normalement ce contrat doit Recrutement d'un cabinet pour former et continuer pendant 33 coacher les spécialistes clusters $ 50,000.00 QC (AMI) A posteriori 8/10/2020 9/7/2020 la mise en œuvre. économiques Le contrat total est environs USD 2.5 millions Consultant Individuel pour la réalisation du 34 CGES (ESMF) qui intégrera un Plan de $ 60,000.00 CI (3 CV) A posteriori 9/10/2020 9/20/2020 TDR approuvé Gestion des Pestes (PGP) Sélection d’un consultant Individuel pour A 35 l’élaboration du Cadre de Politique de $ 35,000.00 CI (3 CV) 9/15/2020 9/25/2020 posteriori Réinstallation (CPR) Selection d'un consultant individuel pour la A 36 preparation du plan de gestion de la main $ 25,000.00 CI (3 CV) 9/10/2020 9/20/2020 TDR approuvé posteriori d'oeuvre Selection d'un consultant individuel pour la A 37 preparation du l'etude d'impact $ 50,000.00 CI (3 CV) 10/20/2020 11/15/2020 posteriori environnemental et sociale Recrutement d’un consultant individuel pour A 38 $ 10,000.00 CI (3 CV) 9/20/2020 10/5/2020 réaliser le PPSD posteriori Recrutement d’un consultant individuel pour A 39 élaborer le manuel de procédures et $ 3,500.00 CI (3 CV) 11/1/2020 11/30/2020 posteriori d’exécution du projet Recrutement d’un Consultant Individuel A 40 pour l’élaboration du manuel de suivi- $ 3,500.00 CI (3 CV) 11/1/2020 11/30/2020 posteriori évaluation du Projet Recrutement d'un expert du secteur financier pour la PIU - renforcement des A 41 $ 10,500.00 CI (3 CV) 2/1/2021 02/30/21 capacites et assurer une bonne mise en posteriori oeuvre des activites de la composante 2 Recrutement d’un Responsable A 42 Administratif, Financier et Comptable de $ 14,000.00 CI (AMI) 1/5/2021 1/30/2021 posteriori l’UCP du PPET Recrutement d’un Spécialiste Passation des 43 $ 14,000.00 CI (AMI) A priori 1/5/2021 1/30/2021 Marchés de l’UCP du PPET Recrutement d’un Comptable de l’UCP du A 44 $ 6,000.00 CI (AMI) 1/5/2021 1/30/2021 PPET posteriori Recrutement d’un Expert Suivi et A 45 $ 14,000.00 CI (3 CV) 1/5/2021 1/30/2021 Evaluation de l’UCP du PPET posteriori Recrutement d’une Assistante de l’UCP du A 46 $ 6,750.00 CI (3 CV) 12/5/2020 12/31/2020 PPET posteriori Recrutement d’un spécialiste en A 47 $ 14,000.00 CI (AMI) 1/5/2021 1/30/2021 environnemental posteriori $ 48 Recrutement d’un spécialiste en Genre CI (AMI) A priori 1/5/2021 1/30/2021 14,000.00 49 Recrutement d’un spécialiste Social $ 14,000.00 CI (AMI) A priori 1/5/2021 1/5/2021 A 50 Recrutement d'un Auditeur Interne $ 14,000.00 CI (AMI) posteriori Nominé le 29 mai $ 2020 - voir arrêté. 51 Coordonnateur du Projet ANO 66,000.00 $5500/mois x 12 mois. 5% du PPA déboursé. $ 52 Services de FIRCA (fiduciaire, sauvegardes) 119,845.00 Versement chaque trimestre $ SOUS-TOTAL CONSULTANTS / SALAIRE 2,698,095.00 II. Fourniture, Travaux et Services Assimilés a. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions de l'Annexe 1 des Directives de passation de marchés de janvier 2011, révisé en juillet 2014 : Nouveaux seuils de revue de la Banque élaborés en décembre 2012 et proposés au Gouvernement le 05 décembre 2012, révisés en juillet 2016 et liés au niveau de risque du projet. Nature des Méthode de passation Valeur seuil Contrats soumis à dépenses de marchés du marché examen préalable $EU de l’IDA 1. Travaux AOI ≥ 10,000,000 (Y compris clés en AON < 10,000,000 Tous les contrats de main, Fourniture et 15.000.000 $EU et montage Demande de cotation – < 200,000 plus d’installations et au moins 3 offres PPP) Entente Directe (*) Contrats ≥ 15 000 Pas de seuil 000 2. Fournitures, AOI ≥ 1,000,000 Systèmes d’Informations et AON < 1,000,000 Services autres Consultation de que les services Fournisseurs à l’échelle de Consultants < 100,000 Tous les contrats de Nationale - Au moins 3 offres 4.000.000 $EU et plus Consultation de Fournisseurs à l’échelle Nationale - Au moins 3 < 500 000 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil Contrats ≥ 4 000 000 $EU (*) Le justificatif de toute entente directe dont le coût estimatif n’atteint pas le seuil de revue préalable de la Banque doit être transmis avec le PPM b. Pré-qualification : Les soumissionnaires pour les marchés ci-après, devront être pré-qualifiés suivant les dispositions des paragraphes 2.9 et 2.10 des Directives : N/A Plan de passation simplifié de l’avance de préparation du Projet de Promotion de l’Emploi et de la Transformation Economique (PPET) -Page 9 sur 13 c. Procédures applicables aux Composantes relatives au Développement Conduit par les Communautés (en relation avec le paragraphe 3.17 des Directives) : Manuel de procédures de passation des marchés. d. Référence (si nécessaire) au Manuel opérationnel/de passation de marchés : Autres arrangements spécifiques pour la passation de marchés : Sans objet Plan de passation simplifié de l’avance de préparation du Projet de Promotion de l’Emploi et de la Transformation Economique (PPET) -Page 10 sur 13 e. Marchés, Planning et Méthode de Passation : Métho Date Date prévue de de Pré- Préféren Examen prévue Montant préparation N passati qualifica ce préalab pour Commenta Description des Contrats Estimatif DAO ou o. on de tion national le de la l’ouvert ires (en $US) DCR/Spécif.tec march (oui/non) e Banque ure des hn. és offres FOURNITURES Acquisition de petits équipements $ A 02/02/2 1 NON 01/07/21 pour le PCU 75,000.00 CFN NON posteriori 1 Acquisition de petits équipements pour les spécialistes de compétitivité $ A 2 NON 01/07/21 02/20/2 (laptops, tablettes, portables, wibox, 99,000.00 posteriori etc.) AON NON 1 $ A 10/13/2 2 Véhicules NON 09/17/20 90,000.00 CFN NON posteriori 0 $ SOUS-TOTAL FOURNITURE 265,000.00 Plan de passation simplifié de l’avance de préparation du Projet de Promotion de l’Emploi et de la Transformation Economique (PPET) -Page 11 sur 13 III. Activités de renforcement des capacités (Formations, Ateliers, Séminaires, Voyages) Ref Montant . Date de Commentai Description du contrat Estimatif No début re ($US) . ATELIERS 4 x Ateliers avec parties prenantes $ 1 composante 1 10,000.00 Atelier de communication pour le cadre $ 2 règlementaire (approche par les risques - 2,500.00 IMFs) Atelier de renforcement des capacités $ 3 des IMF en MIS 10,000.00 Atelier de communication pour le Fonds $ 4 des Fonds 2,500.00 On-the -job training pour renforcer la $ 5 supervision du secteur de la 30,000.00 microfinance On-the-job training for CDC management $ 6 on credit enhancement products 30,000.00 On-the -job training pour renforcer les $ 7 competences de l'équipe de gestion du 30,000.00 Fonds des Fonds $ 8 Composante réformes - à confirmer 4,000.00 Opérationnalisation du Comité de $ 9 pilotage 2,400.00 Other ateliers $ 10 5,000.00 $ SOUS-TOTAL ATELIERS 126,400.00 3.1. Liste des formation, ateliers, séminaires et voyages Voir ci-dessus IV. Financement par catégorie N° Ordre Catégorie Montant en $US 1 Consultant 2,698,095 2 Fourniture 265 000 Formation, ateliers, séminaires et 3 126 400 voyages Plan de passation simplifié de l’avance de préparation du Projet de Promotion de l’Emploi et de la Transformation Economique (PPET) -Page 12 sur 13 Total Général : 3 089 495 Plan de passation simplifié de l’avance de préparation du Projet de Promotion de l’Emploi et de la Transformation Economique (PPET) -Page 13 sur 13 PROCUREMENT Cote d'Ivoire : Competitive Value Chains for Jobs and Economic Transformation Project PLAN General Information Country: Cote d'Ivoire 2020-09-07 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172425 GPN Date: 2021-11-25 Project Name: Competitive Value Chains for Jobs and Economic Transformation Project Loan / Credit No: / , IDA / V3490, IDA / 69360, IDA / 69350 Interprofessional Fund for Agricultural Research and Advisory Executing Agency(ies): WORKS Activity Reference No. / Procurem Actual A Bid Evaluation Repor Loan / Credit Market Approa Procurement Pr Prequalificatio High SEA/SH Process S Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procurement Bidding Documents Proposal Submission Contract Compl Description Component Review Type Method ent Docu mount (U t and Recommendati Signed Contract No. ch ocess n (Y/N) Risk tatus n Documents uation Report ment / Justification Notice / Invitation as Issued / Opening / Minutes etion ment Typ S$) on for Award e Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIRCA-237618-CW-RFQ / Travaux de mise en conform Request for ité des locaux du siège du P Component 4: Project Coor Request for Quot Single Stage - One Quotations ( Under Impl 2021-06-2 2021-07-2 2021-08-2 2022-02- PCET, d'aménagement des IDA / V3490 Post Limited 0.00 dination and Management ations Envelope Non Bank-S ementation 7 2 2 18 bureaux, d'installation de p PD) anneaux directionnels et de caisson lumineux avec le lo go du PPCCET à l'intérieur. Request for CI-FIRCA-256308-CW-RFB / Component 1: Improving th Bids - Works Travaux et aménagements Single Stage - One 2022-02-2 2022-02-2 2022-04-0 2022-05-0 2022-06-1 2022-12- IDA / 69360 e Competitiveness of Suppo Post Request for Bids Open - National (without pre 0.00 Canceled pour l’installation pilote de p Envelope 1 6 9 9 3 10 rted Value Chains qualification roduction et d’essai de prod ) SPD uits pour le Plastique Request for CI-FIRCA-256307-CW-RFB / Component 1: Improving th Bids - Works Single Stage - One 2022-01-0 2022-01-1 2022-02-2 2022-03-2 2022-04-2 2022-10- Aménagements des points d IDA / 69360 e Competitiveness of Suppo Post Request for Bids Open - National (without pre 0.00 Canceled Envelope 5 0 1 3 7 24 e collectes pour la mangue ( rted Value Chains qualification 10 sites ) SPD CI-FIRCA-291589-CW-RFB / National Pro Travaux et aménagement d’ curement D une installation de productio Component 1: Improving th Pending Im Single Stage - One ocument - 1 2022-07-0 2022-07-0 2022-08-1 2022-09-1 2022-10-2 2023-04- n d’énergie renouvelable à IDA / 69360 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 plementati Envelope Envelope pr 1 6 7 6 1 19 base de résidus de transfor rted Value Chains on ocess (Non mation des matières premiè Bank-SPD) res agricoles (hévéa, palmie r à huile, ananas, mangue e t anacarde) Request for CI-FIRCA-291613-CW-RFQ / Quotations - Pending Im Travaux d'aménagement d' Component 4: Project Coor Request for Quot Single Stage - One 2022-05-1 2022-07-0 2023-01- IDA / 69360 Post Limited Small Works 0.00 plementati un réfectoire pour l'UC-PCCE dination and Management ations Envelope 0 5 01 (Emergency on T ) SPD -Comp etitive National Pro CI-FIRCA-295083-CW-RFB / curement D Travaux et aménagements Component 1: Improving th Pending Im Single Stage - One ocument - 1 2022-09-2 2022-10-0 2022-11-1 2022-12-1 2023-01-1 2023-07- de chambres froides de con IDA / 69350 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 plementati Envelope Envelope pr 8 3 4 4 8 17 servation des produits agric rted Value Chains on ocess (Non oles dont les fruits (ex. man Bank-SPD) gue et ananas) et le Karité National Pro CI-FIRCA-295080-CW-RFB / curement D Component 1: Improving th Pending Im Travaux et aménagements Single Stage - One ocument - 1 2022-09-2 2022-10-0 2022-11-1 2022-12-1 2023-01-1 2023-07- IDA / 69350 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 plementati de l’installation de productio Envelope Envelope pr 8 3 4 4 8 17 rted Value Chains on n de produits pour le Karité ocess (Non Bank-SPD) National Pro CI-FIRCA-308460-CW-RFQ / curement D Travaux supplémentaires d' Component 4: Project Coor Request for Quot Single Stage - One Under Impl 2022-08-2 2022-09-0 2022-10-1 2023-04- IDA / 69350 Post Limited ocument - 1 0.00 aménagement du siège du dination and Management ations Envelope ementation 4 7 9 17 Envelope pr PCCET ocess (Non National Bank-SPD)Pro CI-FIRCA-326428-CW-RFQ / curement D Component 2: Improving ac Pending Im Sélection d'un prestataire p Request for Quot Single Stage - One ocument - 1 2022-12-1 2023-02-0 2023-08- IDA / 69350 cess to finance for value ch Post Limited 0.00 plementati our les travaux d’aménage ations Envelope Envelope pr 0 4 03 ains on ment du siège de la FILT ocess (Non Bank-SPD) National Pro CI-FIRCA-291588-CW-RFB / curement D Travaux et aménagements Component 1: Improving th Pending Im Single Stage - One ocument - 1 2022-07-0 2022-07-0 2022-08-1 2022-09-1 2022-10-2 2023-04- du Centre Pilote de Producti IDA / 69360 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 plementati Envelope Envelope pr 1 6 7 6 1 19 on et d'Essai de Produits (CP rted Value Chains on ocess (Non PEP) et ses deux (2) annexe Bank-SPD) s National Pro CI-FIRCA-295082-CW-RFB / Component 1: Improving th curement D Travaux et aménagements Single Stage - One 2022-09-2 2022-10-0 2022-11-1 2022-12-1 2023-01-1 2023-07- IDA / 69350 e Competitiveness of Suppo Post Request for Bids Open - National ocument - 1 0.00 Canceled d’une unité de fabrication d’ Envelope 8 3 4 4 8 17 rted Value Chains Envelope pr emballage ocess (Non Bank-SPD) Request for CI-FIRCA-333941-CW-RFQ / Component 2: Improving ac Pending Im Request for Quot Single Stage - One Quotations ( 2023-01-2 2023-03-1 2023-09- Travaux de mise en conform IDA / 69350 cess to finance for value ch Post Limited 0.00 plementati ations Envelope Non Bank-S 1 8 14 ité du siège du local de la FI ains on PD) LT Request for CI-FIRCA-354363-CW-RFQ / Component 3: Policy Refor Pending Im Request for Quot Single Stage - One Quotations ( 2023-04-1 2023-06-1 2023-12- Travaux de peinture du sièg IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 plementati ations Envelope Non Bank-S 5 0 07 e de la FILT et du PCCET cement on PD) GOODS Activity Reference No. / Bid Evaluation Repor Loan / Credit Market Approa Procurement Pr Prequalificatio Actual Amoun Process St Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method t and Recommendati Signed Contract Contract Completion No. ch ocess n (Y/N) t (US$) atus n Documents uation Report ment / Justification Notice / Invitation as Issued / Opening / Minutes on for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIRCA-191952-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2020-09-2 2020-10-0 2020-11-1 2021-05-1 / Post Limited 0.00 Acquisition de véhicules dination and Management ations Envelope mentation 2 6 7 6 CI-FIRCA-191951-GO-RFB / Acquisition de petits équipe Component 4: Project Coor Single Stage - One 2021-01-0 2021-01-0 2021-02-2 2021-03-2 2021-04-2 2021-10-2 ments pour les spécialistes / Post Request for Bids Open - National 0.00 Canceled dination and Management Envelope 4 9 0 2 6 3 de compétitivité (laptops, ta blettes, portables, wibox, et c.) CI-FIRCA-202206-GO-RFQ / Acquisition d'équipements i nformatiques pour l'équipe Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2020-11-0 2021-01-0 2021-07-0 IDA / V3490 Post Limited 0.00 de coordination de la prépar dination and Management ations Envelope lementation 7 2 1 ation du PPET ( laptops, tabl ettes, portables, imprimante s, disques durs, onduleurs... ..) CI-FIRCA-202210-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2021-01-1 2021-03-1 2021-09-1 Acquisition d'équipements i IDA / V3490 Post Limited 0.00 dination and Management ations Envelope lementation 8 5 1 nformatique pour le PPET CI-FIRCA-236710-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-06-2 2021-08-2 2021-08-1 2021-09-0 2022-02-1 2021-09-3 Acquisition de matériels de IDA / V3490 Post Limited 52,708.27 Completed dination and Management ations Envelope 0 0 5 4 1 0 bureau pour le PCCET CI-FIRCA-236713-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2021-06-2 2021-08-1 2022-02-1 Acquisition d'équipements i IDA / V3490 Post Limited 0.00 dination and Management ations Envelope lementation 0 5 1 nformatiques complémentai res pour le PCCET CI-FIRCA-236714-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-06-1 2021-07-1 2021-08-1 2021-08-1 2022-02-0 Acquisition de mobiliers de IDA / V3490 Post Limited 61,980.56 Signed dination and Management ations Envelope 6 6 1 9 7 bureau pour le PCCET CI-FIRCA-236716-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-06-1 2021-08-1 2021-08-1 2021-09-0 2022-02-1 2021-10-2 Acquisition d'équipements a IDA / V3490 Post Limited 29,941.59 Completed dination and Management ations Envelope 9 9 4 3 0 7 udiovisuels pour le PCCET CI-FIRCA-236845-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2021-06-0 2021-08-0 2022-01-2 IDA / V3490 Post Limited 0.00 Acquisition de carburant po dination and Management ations Envelope lementation 7 2 9 ur le projet CI-FIRCA-237639-GO-RFQ / Fourniture et installation d'u Component 4: Project Coor Request for Quot Single Stage - One 2021-06-3 2021-08-2 2022-02-2 IDA / V3490 Post Limited 0.00 Canceled n système de vidéosurveilla dination and Management ations Envelope 0 5 1 nce et d'une clôture électri fiée au siège du PPCET CI-FIRCA-202209-GO-RFQ / Acquisition et installation (a Component 4: Project Coor Request for Quot Single Stage - One 2020-12-1 2021-02-0 2021-08-0 IDA / V3490 Post Limited 0.00 Canceled bonnement) de wibox pour l dination and Management ations Envelope 4 8 7 'équipe de coordination de l a préparation du PPET CI-FIRCA-237648-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-06-2 2021-08-2 2022-02-1 Acquisition et installation d' IDA / V3490 Post Limited 0.00 Canceled dination and Management ations Envelope 6 1 7 un groupe électrogène au s iège du PCCET CI-FIRCA-251477-GO-RFQ / Acquisition et installation de Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-09-2 2021-09-2 2021-11-2 2022-05-2 laptop, téléphone portable e IDA / V3490 Post Limited 0.00 dination and Management ations Envelope mentation 9 4 4 3 t équipements informatique s complémentaires pour la c oordination du PCCET. CI-FIRCA-254485-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-10-0 2021-09-2 2021-11-2 2022-05-2 Acquisition de matériel pour IDA / V3490 Post Limited 0.00 dination and Management ations Envelope mentation 2 4 7 6 la lutte contre la covid 19 CI-FIRCA-254486-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-10-0 2021-09-2 2021-11-2 2022-05-2 Impression de support de c IDA / V3490 Post Limited 0.00 dination and Management ations Envelope mentation 2 4 7 6 ommunication pour le PCCE T CI-FIRCA-256888-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-10-2 2021-03-1 2021-12-1 2022-06-1 Acquisition de fournitures d IDA / 69360 Post Limited 0.00 dination and Management ations Envelope mentation 3 5 8 6 e bureau (rame de papier, s tylo à bille…) CI-FIRCA-257050-GO-RFB / Component 2: Improving ac Acquisitions de matériels inf Open - Internation Single Stage - One Pending Imp 2022-12-1 2022-12-2 2023-01-3 2023-03-0 2023-04-0 2023-10-0 IDA / 69360 cess to finance for value ch Post Request for Bids 0.00 ormatiques pour la mise en al Envelope lementation 5 0 1 2 6 3 ains place d’un SIG dans les IMFs CI-FIRCA-257112-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Under Imple 2021-12-0 2022-01-1 2022-02-0 2022-07-3 Acquisition de Matériels roul IDA / 69360 cess to finance for value ch Post Limited 0.00 ations Envelope mentation 7 9 1 1 ants (2 véhicules) ains CI-FIRCA-258939-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-10-2 2021-11-1 2021-12-2 2021-12-1 2022-06-2 Acquisition de mobilier de b IDA / 69360 Post Limited 20,979.76 Signed dination and Management ations Envelope 7 6 2 1 0 ureau complémentaire pour l'UCP-PCCET CI-FIRCA-262804-GO-RFQ / Acquisition et installation de Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-11-2 2022-01-1 2022-01-1 2022-07-1 IDA / 69360 Post Limited 0.00 matériels de bureau complé dination and Management ations Envelope mentation 3 0 8 7 mentaire pour le PCCET CI-FIRCA-265677-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-12-0 2021-06-3 2022-01-3 2022-07-2 Acquisition de véhicules (Pic IDA / V3490 Post Limited 0.00 dination and Management ations Envelope mentation 5 0 0 9 k-up et berline pour le PCCE T Page 1 CI-FIRCA-277393-GO-RFQ / ACQUISITION ET INSTALLATI Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2022-04-0 2022-05-3 2022-11-2 IDA / 69360 Post Limited 0.00 ON DE MATERIELS INFORMA dination and Management ations Envelope mentation 5 1 7 TIQUES ET DE MATERIELS A UDIOVISUELS POUR LE FIRC A CI-FIRCA-277396-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2022-04-0 2022-03-1 2022-06-0 2022-12-0 ACQUISITION DE MATERIELS IDA / 69360 Post Limited 0.00 dination and Management ations Envelope mentation 9 5 4 1 DE BUREAU POUR LE FIRCA CI-FIRCA-277399-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2022-04-0 2022-03-3 2022-05-2 2022-11-2 ACQUISITION DE MATERIELS IDA / 69360 Post Limited 0.00 dination and Management ations Envelope mentation 2 0 8 4 ROULANTS (POUR LE FIRCA ET LE PCCET) CI-FIRCA-256682-GO-RFB / Component 1: Improving th Open - Internation Single Stage - One 2022-06-0 2022-06-0 2022-07-1 2022-08-1 2022-09-2 2023-03-2 Acquisition d’Unités de cond IDA / 69360 e Competitiveness of Suppo Post Request for Bids 0.00 Canceled al Envelope 1 6 8 7 1 0 itionnement des ananas rted Value Chains CI-FIRCA-256687-GO-RFB / Component 1: Improving th Acquisition de matériels tec Open - Internation Single Stage - One 2022-05-0 2022-05-1 2022-05-1 IDA / 69360 e Competitiveness of Suppo Post Request for Bids 0.00 Canceled hnologiques et l'équipement al Envelope 9 3 9 rted Value Chains du centre de pilotage techn ologique plastique CI-FIRCA-256683-GO-RFB / Component 1: Improving th Acquisition d’un Service de l Single Stage - One 2022-05-2 2022-06-1 2022-07-2 2022-08-2 2022-09-2 2023-03-2 IDA / 69360 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 Canceled ogistique à température con Envelope 3 1 3 2 6 5 rted Value Chains trôlée pour l'ananas CI-FIRCA-256824-GO-RFB / Component 1: Improving th Acquisition de matériels tec Open - Internation Single Stage - One 2022-11-2 2022-11-2 2023-01-0 2023-02-0 2023-03-1 2023-09-0 IDA / 69360 e Competitiveness of Suppo Post Request for Bids 0.00 Canceled hnologiques et l'équipement al Envelope 1 6 7 6 3 9 rted Value Chains du centre de pilotage techn ologique hévéa CI-FIRCA-256885-GO-RFB / Component 4: Project Coor Single Stage - One 2021-11-1 2021-11-2 2022-01-0 2022-01-3 2022-03-0 2022-09-0 Acquisition de consommabl IDA / 69360 Post Request for Bids Open - National 0.00 Canceled dination and Management Envelope 5 0 1 1 7 3 es informatiques pour l’UCP CI-FIRCA-256846-GO-RFB / Component 1: Improving th Single Stage - One 2022-10-0 2022-10-0 2022-11-1 2022-12-1 2023-01-2 2023-07-2 Service logistique Palmier à IDA / 69360 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 Canceled Envelope 3 8 9 9 3 2 huile rted Value Chains CI-FIRCA-256853-GO-RFB / Acquisition d’équipements i Component 4: Project Coor Single Stage - One 2021-10-2 2021-10-3 2021-12-1 2022-01-1 2022-02-1 2022-08-1 nformatiques pour l’UCP (im IDA / 69360 Post Request for Bids Open - National 0.00 Canceled dination and Management Envelope 5 0 1 0 4 3 primante, photocopieur, sca nneur, multimédia (Zoom…) CI-FIRCA-256847-GO-RFB / Component 4: Project Coor Single Stage - One 2021-12-0 2021-12-1 2022-01-2 2022-02-2 2022-03-2 2022-09-2 Acquisition de véhicules de t IDA / 69360 Post Request for Bids Open - National 0.00 Canceled dination and Management Envelope 6 1 2 1 8 4 ype 4X4 et berlines pour l’U CP CI-FIRCA-256310-GO-RFB / Component 2: Improving ac Single Stage - One 2021-12-0 2021-12-1 2022-01-2 2022-02-2 2022-03-2 2022-09-2 IDA / 69360 Post Request for Bids Open - National 0.00 Canceled Acquisition de petits matéri cess to finance for value ch Envelope 6 1 2 1 8 4 els (DRS-SFD) ains CI-FIRCA-256403-GO-RFB / Acquisition d’unités mobile Component 1: Improving th Open - Internation Single Stage - One 2022-02-0 2022-02-0 2022-03-2 2022-04-2 2022-05-2 2022-11-2 hors réseau de traitement e IDA / 69360 e Competitiveness of Suppo Post Request for Bids 0.00 Canceled al Envelope 2 7 1 0 5 1 t de conditionnement à l'ea rted Value Chains u chaude, le refroidissement et l'emballage de la mangue CI-FIRCA-256396-GO-RFB / Component 2: Improving ac Acquisition d’un software po Single Stage - One 2022-01-1 2022-01-1 2022-02-2 2022-03-2 2022-05-0 2022-10-2 IDA / 69360 cess to finance for value ch Post Request for Bids Open - National 0.00 Canceled ur la comptabilité et équipe Envelope 0 5 6 8 2 9 ains ment IT pour la CDC-CI CI-FIRCA-256845-GO-RFB / Component 1: Improving th Single Stage - One 2022-11-1 2022-11-1 2022-12-3 2023-01-3 2023-03-0 2023-09-0 Acquisition de Service logist IDA / 69360 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 Canceled Envelope 4 9 1 0 6 2 ique pour l’hévéa rted Value Chains CI-FIRCA-256883-GO-RFB / Acquisition de mobiliers de Component 4: Project Coor Single Stage - One 2021-11-0 2021-11-1 2021-12-2 2022-01-2 2022-02-2 2022-08-2 IDA / 69360 Post Request for Bids Open - National 0.00 Canceled bureau (bureaux, fauteuils d dination and Management Envelope 8 3 5 4 8 7 e bureau, chaises visiteur…) CI-FIRCA-257107-GO-RFB / Component 1: Improving th Open - Internation Single Stage - One 2021-12-0 2021-12-1 2022-01-2 2022-02-2 2022-03-2 2022-09-2 Acquisition de matériels info IDA / 69360 e Competitiveness of Suppo Post Request for Bids 0.00 Canceled al Envelope 6 1 2 1 8 4 rmatiques rted Value Chains CI-FIRCA-256312-GO-RFB / Component 2: Improving ac Single Stage - One 2021-12-0 2021-12-1 2022-01-2 2022-02-2 2022-03-3 2022-09-2 Acquisition de Petits matéri IDA / 69360 cess to finance for value ch Post Request for Bids Open - National 0.00 Canceled Envelope 9 4 5 4 1 7 els informatiques pour les I ains MF CI-FIRCA-256933-GO-RFB / Acquisition d'Équipements i Component 3: Policy Refor Open - Internation Single Stage - One 2021-11-0 2021-11-1 2021-12-2 2022-01-2 2022-02-2 2022-08-2 nformatiques dans le cadre IDA / 69360 ms and Institutional Reinfor Post Request for Bids 0.00 Canceled al Envelope 8 3 5 4 8 7 de la dématérialisation des cement procédures de gestion des t errains industriels CI-FIRCA-256407-GO-RFB / Component 1: Improving th Acquisitions de Camions pla Open - Internation Single Stage - One 2022-02-1 2022-02-1 2022-04-0 2022-05-0 2022-06-0 2022-12-0 IDA / 69360 e Competitiveness of Suppo Post Request for Bids 0.00 Canceled teau pour les unités mobiles al Envelope 4 9 2 2 6 3 rted Value Chains de traitement de l'eau chau de et de refroidissement CI-FIRCA-256414-GO-RFB / Component 1: Improving th Acquisition d’un Service de l Single Stage - One 2022-04-0 2022-04-0 2022-05-2 2022-06-2 2022-07-2 2023-01-2 IDA / 69360 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 Canceled ogistique à température con Envelope 4 9 1 0 5 1 rted Value Chains trôlée pour la mangue CI-FIRCA-256880-GO-RFB / Component 4: Project Coor Single Stage - One 2021-11-0 2021-11-1 2021-12-2 2022-01-2 2022-02-2 2022-08-2 Acquisition d’ordinateurs de IDA / 69360 Post Request for Bids Open - National 0.00 Canceled dination and Management Envelope 8 3 5 4 8 7 bureau et d’ordinateurs port ables pour l’UCP CI-FIRCA-236850-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-06-1 2021-08-1 2022-02-0 Acquisition de consommabl IDA / V3490 Post Limited 0.00 Canceled dination and Management ations Envelope 6 1 7 es informatiques pour le PC CET CI-FIRCA-189858-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-01-1 2021-03-0 2021-09-0 Acquisition de petits équipe / Post Limited 0.00 Canceled dination and Management ations Envelope 2 9 5 ments pour le PCU CI-FIRCA-237669-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-08-2 2021-10-1 2022-04-1 Impression des supports de IDA / V3490 Post Limited 0.00 Canceled dination and Management ations Envelope 1 6 4 communication du PPCET CI-FIRCA-202216-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2020-12-2 2021-02-2 2021-08-2 Acquisition de fournitures d IDA / V3490 Post Limited 0.00 Canceled dination and Management ations Envelope 7 1 0 e bureau pour le PPET CI-FIRCA-202213-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2020-11-2 2021-01-1 2021-07-1 Acquisition de fournitures d IDA / V3490 Post Limited 0.00 Canceled dination and Management ations Envelope 2 7 6 e bureau pour l'équipe de c oordination du PPET CI-FIRCA-256400-GO-RFQ / Component 1: Improving th Acquisition de logiciels ou li Request for Quot Single Stage - One 2021-12-1 2022-02-0 2022-08-0 IDA / 69360 e Competitiveness of Suppo Post Limited 0.00 Canceled cences pour les Initiatives d ations Envelope 3 7 6 rted Value Chains e Renforcement de la Comp étitivité (IRC) CI-FIRCA-291591-GO-RFQ / Acquisition de logiciels, lice Component 1: Improving th Request for Quot Single Stage - One Pending Imp 2022-08-0 2022-10-0 2023-03-3 nces et petits équipements IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 ations Envelope lementation 6 1 0 pour les Initiatives de Renfo rted Value Chains rcement de la Compétitivité (IRC) CI-FIRCA-291594-GO-RFB / Acquisition et installation de Component 3: Policy Refor Single Stage - One Pending Imp 2022-08-0 2022-08-0 2022-09-1 2022-10-1 2022-11-2 2023-05-2 s équipements et matériels IDA / 69360 ms and Institutional Reinfor Post Request for Bids Open - National 0.00 Envelope lementation 1 6 7 7 1 0 de la plateforme de délivran cement ce des licences et permis d' affaires en ligne CI-FIRCA-291593-GO-RFQ / Acquisition et installation d’ équipements de laboratoire Component 1: Improving th Request for Quot Single Stage - One 2022-08-0 2022-10-0 2023-03-3 pour la mise en conformité IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled ations Envelope 6 1 0 du laboratoire d’analyse des rted Value Chains sols de l’École Supérieure d’ Agronomie de l’INPHB à Ya moussoukro CI-FIRCA-291595-GO-RFB / Acquisition et installation de Component 3: Policy Refor Open - Internation Single Stage - One Pending Imp 2022-08-0 2022-08-0 2022-09-1 2022-10-1 2022-11-2 2023-05-2 s équipements et matériels IDA / 69360 ms and Institutional Reinfor Post Request for Bids 0.00 al Envelope lementation 1 6 7 7 1 0 de la version 2 de la platefo cement rme de création d'entreprise s en ligne (e-gufe 2.0) CI-FIRCA-291596-GO-RFB / Équipements d’une installati on de production d’énergie r Component 1: Improving th Open - Internation Single Stage - One Pending Imp 2022-08-0 2022-08-0 2022-09-1 2022-10-1 2022-11-2 2023-05-2 enouvelable à base de rési IDA / 69360 e Competitiveness of Suppo Post Request for Bids 0.00 al Envelope lementation 1 6 7 7 1 0 dus de transformation des rted Value Chains matières premières agricole s (hévéa, palmier à huile, an anas, mangue et anacarde) CI-FIRCA-291598-GO-RFB / Acquisition et installation de Component 3: Policy Refor Open - Internation Single Stage - One Pending Imp 2022-08-0 2022-08-0 2022-09-1 2022-10-1 2022-11-2 2023-05-2 s équipements et matériels IDA / 69360 ms and Institutional Reinfor Post Request for Bids 0.00 al Envelope lementation 2 7 8 8 2 1 pour la généralisation de l’I cement DU (Identifiant Unique) des entreprises à l’intérieur du p ays CI-FIRCA-291599-GO-RFB / Component 4: Project Coor Single Stage - One Under Imple 2022-06-0 2022-09-2 2022-06-0 2022-10-0 2022-07-1 2022-08-1 2022-09-2 2023-03-2 IDA / 69360 Post Request for Bids Open - National 0.00 Acquisition de matériels info dination and Management Envelope mentation 1 2 6 4 8 7 1 0 rmatiques CI-FIRCA-291600-GO-RFB / Component 3: Policy Refor Acquisition et installation de Open - Internation Single Stage - One Pending Imp 2022-08-0 2022-08-0 2022-09-1 2022-10-1 2022-11-2 2023-05-2 IDA / 69360 ms and Institutional Reinfor Post Request for Bids 0.00 s équipements du SIGETI (c al Envelope lementation 1 6 7 7 1 0 cement omprenant notamment un module SIG) CI-FIRCA-291601-GO-RFB / Component 3: Policy Refor Acquisition d’équipements, Single Stage - One Pending Imp 2022-05-2 2022-05-2 2022-07-0 2022-08-0 2022-09-0 2023-03-0 IDA / 69360 ms and Institutional Reinfor Post Request for Bids Open - National 0.00 de matériel informatique et Envelope lementation 0 5 6 5 9 8 cement de kits pour les services d’in spection phytosanitaire CI-FIRCA-291602-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-06-0 2022-08-0 2023-01-2 Acquisition de matériels roul IDA / 69360 Post Limited 0.00 dination and Management ations Envelope lementation 6 1 8 ants (4 véhicules) pour l’UC- PCCET CI-FIRCA-291604-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2022-06-0 2022-05-3 2022-08-0 2023-01-2 Acquisition de consommabl IDA / 69360 Post Limited 0.00 dination and Management ations Envelope mentation 6 0 1 8 es informatiques pour l’UCP Page 2 CI-FIRCA-291608-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-09-1 2022-11-0 2023-05-0 Acquisition de matériels de IDA / 69360 Post Limited 0.00 dination and Management ations Envelope lementation 0 5 4 bureau pour l’UCP CI-FIRCA-291607-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-06-0 2022-08-0 2023-01-2 IDA / 69360 Post Limited 0.00 Acquisition de fournitures d dination and Management ations Envelope lementation 6 1 8 e bureau CI-FIRCA-291615-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-05-0 2022-07-0 2022-12-2 Acquisition d'équipements p IDA / 69360 Post Limited 0.00 dination and Management ations Envelope lementation 7 2 9 our le réfectoire de l'UC-PCC ET CI-FIRCA-295045-GO-RFQ / Acquisition d’équipements ( Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-07-0 2022-09-0 2023-03-0 IDA / 69360 Post Limited 0.00 ordinateurs, wibox, télépho dination and Management ations Envelope lementation 9 3 2 nes portables…) pour l’UCP CI-FIRCA-295075-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-09-2 2022-11-2 2023-05-1 Acquisition de véhicules pou IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 5 0 9 r l’UCP PCCET CI-FIRCA-295088-GO-RFB / Acquisition de matériels tec hnologiques, d’équipements Component 1: Improving th Open - Internation Single Stage - One Pending Imp 2022-09-2 2022-10-0 2022-11-1 2022-12-1 2023-01-1 2023-07-1 et de fournitures de chambr IDA / 69350 e Competitiveness of Suppo Post Request for Bids 0.00 al Envelope lementation 6 1 2 2 6 5 es froides de conservation d rted Value Chains es produits agricoles dont le s fruits (ex. mangue et anan as) et le Karité CI-FIRCA-295134-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2022-06-1 2022-05-2 2022-08-1 2023-02-0 Acquisition de 4 couvres Be IDA / 69350 Post Limited 0.00 dination and Management ations Envelope mentation 8 5 3 9 nne de Pick up et accessoire s associés CI-FIRCA-295135-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2022-06-1 2022-05-3 2022-08-0 2023-02-0 Acquisition d’Equipements d IDA / 69350 Post Limited 0.00 dination and Management ations Envelope mentation 1 0 6 2 e Protection Individuel (EPI) pour le PCCET CI-FIRCA-295136-GO-RFB / Acquisition et installation d’ équipements de laboratoire Component 1: Improving th Single Stage - One Pending Imp 2022-08-0 2022-08-0 2022-09-1 2022-10-1 2022-11-2 2023-05-2 pour la mise en conformité IDA / 69350 e Competitiveness of Suppo Post Request for Bids Open - National 0.00 Envelope lementation 1 6 7 7 1 0 du laboratoire d’analyse des rted Value Chains sols de l’École Supérieure d’ Agronomie de l’INPHB à Ya moussoukro CI-FIRCA-295211-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-06-0 2022-08-0 2023-01-2 Acquisition de stabilisateur IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 7 2 9 pour l'UC-PCCET CI-FIRCA-295084-GO-RFB / Acquisition de matériels tec Component 1: Improving th Open - Internation Single Stage - One Pending Imp 2022-08-0 2022-08-1 2022-09-2 2022-10-2 2022-11-2 2023-05-2 hnologiques, d’équipements IDA / 69350 e Competitiveness of Suppo Post Request for Bids 0.00 al Envelope lementation 8 3 4 4 8 7 et de fournitures de l’install rted Value Chains ation de production pour le Karité CI-FIRCA-308464-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-08-2 2022-10-1 2023-04-1 Acquisition et installation d' IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 4 9 7 un coffre-fort pour le PCCET CI-FIRCA-308481-GO-RFQ / Acquisition de meubles (me Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-09-0 2022-10-2 2023-04-2 ubles de cloisonnement de IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 3 9 7 bureau, meubles pour le no uvel open space) pour les n ouveaux collaborateurs CI-FIRCA-316346-GO-RFQ / Component 3: Policy Refor Acquisition de motocyclette Request for Quot Single Stage - One Pending Imp 2022-09-2 2022-11-2 2023-05-2 IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 s (240 motos) pour les agen ations Envelope lementation 7 2 1 cement ces d'exécution du PCCET CI-FIRCA-316350-GO-RFQ / Component 3: Policy Refor Acquisition et installation d Request for Quot Single Stage - One Under Imple 2022-09-2 2022-09-2 2022-11-2 2023-05-2 IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 e matériels topographiques ations Envelope mentation 6 7 1 0 cement pour les agences d'exécutio n du PCCET CI-FIRCA-316351-GO-RFQ / Component 3: Policy Refor Acquisition et installation de Request for Quot Single Stage - One Pending Imp 2022-09-2 2022-11-2 2023-05-2 IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 matériels audiovisuels pour ations Envelope lementation 7 2 1 cement les agences d'exécution du PCCET CI-FIRCA-316359-GO-RFQ / Component 3: Policy Refor Acquisition de véhicules (15 Request for Quot Single Stage - One Under Imple 2022-09-2 2022-09-2 2022-11-2 2023-05-2 IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 véhicules 4*4) pour les age ations Envelope mentation 8 7 3 2 cement nces d'exécution du PCCET CI-FIRCA-316392-GO-RFB / Component 3: Policy Refor Acquisition et installation d' Single Stage - One Under Imple 2022-10-0 2022-12-2 2022-10-0 2023-01-0 2022-11-1 2022-12-1 2023-01-2 2023-07-2 IDA / 69350 ms and Institutional Reinfor Post Request for Bids Open - National 0.00 équipements techniques po Envelope mentation 3 9 8 3 9 9 3 2 cement ur la DGPSA / DPVCQ CI-FIRCA-324848-GO-RFB / Acquisition d'équipements d Component 3: Policy Refor Single Stage - One Pending Imp 2022-11-2 2022-12-0 2023-01-1 2023-02-1 2023-03-2 2023-09-1 e bureau et de matériels inf IDA / 69350 ms and Institutional Reinfor Post Request for Bids Open - National 0.00 Envelope lementation 8 3 4 3 0 6 ormatiques pour le renforce cement ment des capacités du CEPI CI CI-FIRCA-326430-GO-RFB / Component 2: Improving ac Single Stage - One Pending Imp 2022-11-3 2022-12-0 2023-01-1 2023-02-1 2023-03-2 2023-09-1 Acquisition et installation de IDA / 69350 cess to finance for value ch Post Request for Bids Open - National 0.00 Envelope lementation 0 5 6 5 2 8 mobiliers de bureaux pour l ains e siège de la LTIF CI-FIRCA-326463-GO-RFB / Component 2: Improving ac Single Stage - One Pending Imp 2022-12-0 2022-12-1 2023-01-2 2023-02-2 2023-03-2 2023-09-2 Acquisition et installation d' IDA / 69350 cess to finance for value ch Post Request for Bids Open - National 0.00 Envelope lementation 5 0 1 0 7 3 équipements pour le siège d ains e la FILT CI-FIRCA-326465-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2022-12-2 2023-02-1 2023-08-1 IDA / 69350 Post Limited 0.00 Acquisition de véhicules pou cess to finance for value ch ations Envelope lementation 4 8 7 r la LTIF ains CI-FIRCA-326466-GO-RFB / Component 2: Improving ac Single Stage - One Pending Imp 2022-12-1 2022-12-1 2023-01-2 2023-02-2 2023-04-0 2023-09-3 Acquisition de fournitures d IDA / 69350 cess to finance for value ch Post Request for Bids Open - National 0.00 Envelope lementation 2 7 8 7 3 0 e bureau pour la FILT ains CI-FIRCA-326469-GO-DIR / Component 2: Improving ac Pending Imp 2022-12-1 2022-12-2 2023-01-2 2023-07-2 Entente directe avec Total E IDA / 69350 cess to finance for value ch Post Direct Selection Direct - National 0.00 lementation 5 0 4 3 nergy pour la fourniture de ains carburant à la LTIF CI-FIRCA-291590-GO-RFB / Acquisition de matériels tec Component 1: Improving th hnologiques, d’équipements Open - Internation Single Stage - One Pending Imp 2022-08-0 2022-08-1 2022-09-2 2022-10-2 2022-11-2 2023-05-2 IDA / 69360 e Competitiveness of Suppo Post Request for Bids 0.00 et de fournitures pour le Ce al Envelope lementation 8 3 4 4 8 7 rted Value Chains ntre Pilote de Production et d'Essai de Produits (CPPEP) et ses deux (2) annexes CI-FIRCA-332149-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2022-12-2 2023-02-2 2023-08-1 Conception et fourniture de IDA / 69360 Post Open - National 0.00 dination and Management ations Envelope mentation 6 0 9 gadgets de communication pour le PCCET CI-FIRCA-295086-GO-RFB / Acquisition de matériels tec Component 1: Improving th Open - Internation Single Stage - One 2022-09-2 2022-10-0 2022-11-1 2022-12-1 2023-01-1 2023-07-1 hnologiques, d’équipements IDA / 69350 e Competitiveness of Suppo Post Request for Bids 0.00 Canceled al Envelope 6 1 2 2 6 5 et de fournitures pour l’unit rted Value Chains é de fabrication d’emballag e CI-FIRCA-333936-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Under Imple 2023-01-2 2023-01-0 2023-03-1 2023-09-1 Acquisition de matériels info IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope mentation 1 9 8 4 rmatiques pour le CEPICI ains CI-FIRCA-333937-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-01-2 2023-03-1 2023-09-1 Acquisition de mobiliers de IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 1 8 4 bureau pour la FILT ains CI-FIRCA-333940-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-01-2 2023-03-1 2023-09-1 Acquisition d'un groupe élec IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 1 8 4 trogène pour le CEPICI ains CI-FIRCA-335477-GO-RFB / Component 3: Policy Refor Single Stage - One Pending Imp 2023-02-2 2023-02-2 2023-04-0 2023-05-0 2023-06-1 2023-12-0 Acquisition de groupes élect IDA / 69350 ms and Institutional Reinfor Post Request for Bids Open - National 0.00 Envelope lementation 0 5 8 8 2 9 rogènes 500 KVA pour le CE cement PICI CI-FIRCA-335480-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-03-0 2023-04-2 2023-10-2 Acquisition de deux onduleu IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 4 9 6 rs de 150 KVA pour le CEPIC cement I CI-FIRCA-335481-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Under Imple 2023-03-1 2023-01-2 2023-05-0 2023-11-0 Acquisition de matériels info IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope mentation 1 4 6 2 rmatiques complémentaires cement pour le CEPICI CI-FIRCA-335482-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-03-0 2023-05-0 2023-10-2 Acquisition de mobiliers de IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 7 2 9 bureau pour le GUPC cement CI-FIRCA-335484-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Under Imple 2023-03-0 2023-01-2 2023-05-0 2023-10-2 Acquisition de motos pour le IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope mentation 7 0 2 9 GUPC et le DGPSA cement CI-FIRCA-335485-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-03-0 2023-05-0 2023-10-2 Acquisition d’ordinateurs, d IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 6 1 8 e serveurs, de logiciel et aut cement res pour le MCLU CI-FIRCA-335486-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-02-1 2023-04-1 2023-10-1 Acquisition de matériels de IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 8 5 2 bureau pour la FILT ains CI-FIRCA-335618-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Under Imple 2023-02-1 2023-01-2 2023-04-1 2023-10-1 IDA / 69350 Post Limited 0.00 Acquisition de photocopieur cess to finance for value ch ations Envelope mentation 8 6 5 2 s pour la FILT ains CI-FIRCA-335633-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-02-1 2023-04-0 2023-10-0 Acquisitions de véhicules co IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 1 8 5 mplémentaires pour les age cement nces d'exécution CI-FIRCA-291597-GO-RFB / Acquisition et installation de Component 3: Policy Refor Single Stage - One 2022-08-0 2022-08-0 2022-09-1 2022-10-1 2022-11-2 2023-05-2 s équipements et matériels IDA / 69360 ms and Institutional Reinfor Post Request for Bids Open - National 0.00 Canceled Envelope 1 6 7 7 1 0 pour la modernisation des a cement rchives du guichet Unique d u CEPICI CI-FIRCA-337552-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2023-02-1 2023-04-1 2023-10-1 Acquisition de fournitures d IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 8 5 2 e bureau pour le PCCET Page 3 CI-FIRCA-337555-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2023-02-1 2023-04-0 2023-10-0 Acquisition de consommabl IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 1 8 5 es informatiques le PCCET CI-FIRCA-340294-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-06-0 2023-11-3 Acquisition et installation de IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 8 3 0 matériels informatiques pou ains r la SOGEDI CI-FIRCA-340295-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-0 2023-12-0 IDA / 69350 Post Limited 0.00 Acquisition de serveurs pour cess to finance for value ch ations Envelope lementation 1 6 3 le MCLU ains CI-FIRCA-340296-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-06-0 2023-12-0 Acquisition de tablette à coq IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 9 4 1 ues endurcies pour le GUPC ains CI-FIRCA-340297-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-0 2023-12-0 Acquisition et installation de IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 2 7 4 matériels informatiques pou ains r la DRSSFD CI-FIRCA-345595-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-06-0 2023-11-2 Acquisition de fournitures d IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 6 1 8 e bureaux pour la FILT ains CI-FIRCA-345597-GO-RFQ / Component 2: Improving ac Acquisition d équipements i Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-06-0 2023-11-3 IDA / 69350 cess to finance for value ch Post Limited 0.00 nformatiques pour la FILT et ations Envelope lementation 8 3 0 ains pour les acteurs de la chaîn e de dépense ( AC et CF) CI-FIRCA-346331-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-06-0 2023-11-3 Acquisition de mobiliers de IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 8 3 0 bureau complémentaires po cement ur le GUPC CI-FIRCA-346333-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-0 2023-12-0 Acquisition de matériels info IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 0 5 2 rmatiques pour la DGD cement CI-FIRCA-346335-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-0 2023-12-0 Acquisition de matériels info IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 1 6 3 rmatiques pour la DGPSA cement CI-FIRCA-346398-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2023-04-1 2021-06-1 2023-06-0 2023-12-0 IDA / 69350 Post Limited 0.00 Acquisition de carburant po dination and Management ations Envelope mentation 0 7 5 2 ur l'UC-PCCET CI-FIRCA-345600-GO-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-06-0 2023-11-3 Acquisition de cinq (5) véhic IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 8 3 0 ules pour la FILT ains CI-FIRCA-354362-GO-RFQ / Sélection d'un prestataire p Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-04-2 2023-06-1 2023-12-1 our la fourniture et la pose d IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 2 7 4 'enseigne lumineuse, panne cement aux directionnels, signalétiq ue du siège de la FILT CI-FIRCA-359528-GO-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2023-09-1 2023-11-1 2024-05-0 Conception et impression de IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 6 1 9 gadgets de fin année pour l e PCCET CI-FIRCA-359532-GO-RFQ / Component 1: Improving th Request for Quot Single Stage - One Pending Imp 2023-06-0 2023-07-2 2024-01-2 Acquisition et installation d' IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 ations Envelope lementation 3 9 5 onduleurs 120 KVA pour le rted Value Chains CEPICI CI-FIRCA-359533-GO-RFQ / Component 3: Policy Refor Request for Quot Single Stage - One Pending Imp 2023-05-2 2023-07-2 2024-01-1 Acquisition et installation de IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 ations Envelope lementation 7 2 8 tablettes pour le MCLU cement CI-FIRCA-362225-GO-RFB / Component 2: Improving ac Open - Internation Single Stage - One 2023-06-0 2023-06-1 2023-07-2 2023-08-2 2023-09-2 2024-03-2 Fourniture et installation du IDA / 69350 cess to finance for value ch Post Request for Bids 0.00 Canceled al Envelope 5 0 2 1 5 3 SIG mutualisé ains CI-FIRCA-366315-GO-RFB / Acquisition, fourniture et ins tallation de l’infrastructure t Component 2: Improving ac Open - Internation Single Stage - One Pending Imp 2023-06-2 2023-07-0 2023-08-1 2023-09-1 2023-10-1 2024-04-1 echnique supportant la mise IDA / 69350 cess to finance for value ch Post Request for Bids 0.00 al Envelope lementation 7 2 3 2 7 4 en œuvre d’un Système d’In ains formation et de Gestion (SIG ) mutualisé pour les Instituti ons de Microfinance (IMF) e ngagées (11 IMF) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Repor Loan / Credit Market Approa Procurement Pr Prequalificatio Actual Amoun Process St Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procurement Bidding Documents Proposal Submission Description Component Review Type Method t and Recommendati Signed Contract Contract Completion No. ch ocess n (Y/N) t (US$) atus n Documents uation Report ment / Justification Notice / Invitation as Issued / Opening / Minutes on for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIRCA-236715-NC-RFQ / Sélection d'un prestataire p Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-06-1 2021-08-2 2021-08-1 2022-02-0 IDA / V3490 Post Limited 0.00 our l'archivage numérique d dination and Management ations Envelope mentation 5 0 0 6 es documents du PCCET CI-FIRCA-236718-NC-DIR / Component 4: Project Coor Pending Imp 2021-06-0 2021-06-0 2021-07-1 2022-01-1 IDA / V3490 Post Direct Selection Direct 0.00 Contrat de bail des locaux d dination and Management lementation 4 9 4 0 u PCCET CI-FIRCA-236831-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-06-0 2021-06-1 2021-08-0 2022-01-2 IDA / V3490 Post Limited 0.00 Entretien des locaux du PCC dination and Management ations Envelope mentation 6 7 1 8 ET CI-FIRCA-236836-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2021-06-0 2021-06-1 2021-08-0 2022-01-2 Services de gardiennage de IDA / V3490 Post Limited 0.00 dination and Management ations Envelope mentation 6 7 1 8 s locaux du PCCET CI-FIRCA-236838-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One 2021-06-0 2021-06-2 2021-08-0 2021-07-2 2022-01-2 Souscription d'une police d' IDA / V3490 Post Limited 15,965.00 Signed dination and Management ations Envelope 6 9 1 8 8 assurance pour le personne l du PPCET CI-FIRCA-236843-NC-RFQ / Souscription à une police d' Component 4: Project Coor 2021-06-1 2021-06-0 2021-06-1 2021-06-0 2021-07-2 2021-06-0 2022-01-1 IDA / V3490 Post Direct Selection Direct 4,517.15 Signed assurance AXA pour les deu dination and Management 1 8 6 8 1 9 7 x (02) véhicules du PPCET CI-FIRCA-236859-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2021-06-1 2021-08-1 2022-02-0 Entretien des ordinateurs et IDA / V3490 Post Limited 0.00 dination and Management ations Envelope lementation 6 1 7 équipements informatiques du PCCET CI-FIRCA-237647-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2021-06-2 2021-08-2 2022-02-1 IDA / V3490 Post Limited 0.00 Entretien des splits du PPC dination and Management ations Envelope lementation 6 1 7 ET CI-FIRCA-237649-NC-RFQ / Fourniture et installation d'u Component 4: Project Coor Request for Quot Single Stage - One 2021-06-2 2021-08-2 2022-02-1 IDA / V3490 Post Limited 0.00 Canceled ne ligne internet haut débit dination and Management ations Envelope 6 1 7 et d'une ligne internet au si ège du PCCET CI-FIRCA-254484-NC-RFQ / Souscription à une police d' Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2021-10-0 2021-11-2 2022-05-2 IDA / V3490 Post Limited 0.00 assurance habitation pour le dination and Management ations Envelope lementation 3 8 7 s locaux du siège du PCCET CI-FIRCA-265305-NC-DIR / S élection directe d'AXA COTE Component 4: Project Coor Pending Imp 2021-12-0 2021-12-1 2022-01-1 2022-07-1 IDA / 69360 Post Direct Selection Direct 0.00 D'IVOIRE pour une assuranc dination and Management lementation 6 1 5 4 e multirisque professionnell e pour le siège du PCCET CI-FIRCA-256936-NC-RFQ / Component 2: Improving ac Request for Quot Single Stage - One 2021-11-0 2021-12-2 2022-06-2 Entretien et la réparation de IDA / 69360 cess to finance for value ch Post Limited 0.00 Canceled ations Envelope 3 9 7 s climatiseurs de l'UCP ains CI-FIRCA-257045-NC-RFQ / Component 1: Improving th Request for Quot Single Stage - One 2021-10-3 2021-12-2 2022-06-2 Entretien des bureaux de l’U IDA / 69360 e Competitiveness of Suppo Post Limited 0.00 Canceled ations Envelope 0 5 3 CP rted Value Chains CI-FIRCA-291592-NC-RFB / Sélection d’une firme pour l Component 4: Project Coor Single Stage - One 2022-05-2 2022-05-2 2022-07-0 2022-08-0 2022-09-0 2023-03-0 IDA / 69360 Post Request for Bids Open - National 0.00 Canceled a gestion et l’hébergement dination and Management Envelope 0 5 6 5 9 8 des données de l’UC-PCCET CI-FIRCA-303248-NC-RFQ / Souscription à une police d' Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-08-2 2022-10-1 2023-04-1 IDA / 69350 Post Limited 0.00 assurance individuel accide dination and Management ations Envelope lementation 0 5 3 nt pour le personnel du PCC ET CI-FIRCA-303799-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-08-0 2022-10-0 2023-03-3 Sélection d'un prestataire p IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 6 1 0 our le tracking des véhicule s du PCCET CI-FIRCA-303800-NC-RFQ / Sélection d'un prestataire p Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-07-3 2022-09-2 2023-03-2 our l'entretien des locaux d IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 0 4 3 u PCCET au titre de la secon de année d'exercice (Juil 20 22 - juin 2023) CI-FIRCA-303801-NC-RFQ / Sélection d'un prestataire p Component 4: Project Coor Request for Quot Single Stage - One Under Imple 2022-07-2 2022-07-2 2022-09-1 2023-03-1 our le gardiennage des loca IDA / 69350 Post Limited 0.00 dination and Management ations Envelope mentation 3 8 7 6 ux du PCCET au titre de la s econde année d'exercice (ju illet 2022 - juin 2023) CI-FIRCA-318975-NC-RFQ / Sélection d'un prestataire p Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2022-10-1 2022-12-1 2023-06-0 IDA / 69350 Post Limited 0.00 our la maintenance des équi dination and Management ations Envelope lementation 5 0 8 pements électriques du PCC ET CI-FIRCA-319400-NC-DIR / E Component 4: Project Coor Under Imple 2022-10-2 2022-10-2 2022-12-0 2023-06-0 ntente Directe avec AGOSO IDA / 69350 Post Direct Selection Direct - National 0.00 dination and Management mentation 4 9 3 1 FT POUR l'acquisition du logi ciel Tom monitoring CI-FIRCA-326501-NC-RFQ / Sélection d'un prestataire p Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-01-1 2023-03-1 2023-09-0 our la souscription d’une pol IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 4 1 7 ice assurance multirisque pr ains ofessionnelle pour le siège d e la LTIF CI-FIRCA-326488-NC-RFQ / Component 2: Improving ac Sélection d'un prestataire p Request for Quot Single Stage - One Pending Imp 2023-01-2 2023-03-1 2023-09-1 IDA / 69350 cess to finance for value ch Post Limited 0.00 our la souscription d’une pol ations Envelope lementation 1 8 4 ains ice assurance pour les véhic ules de la FILT Page 4 CI-FIRCA-326478-NC-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Under Imple 2023-01-1 2022-12-1 2023-03-1 2023-09-0 Sélection d’un prestataire p IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope mentation 4 2 1 7 our le gardiennage des loca ains ux de la FILT CI-FIRCA-326479-NC-RFQ / Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-01-1 2023-03-1 2023-09-0 Sélection d’un prestataire p IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 4 1 7 our l’entretien des locaux d ains e la FILT CI-FIRCA-340298-NC-RFQ / Sélection d’une régie publici Component 2: Improving ac taire pour l’achat d’espace Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-05-2 2023-11-2 IDA / 69350 cess to finance for value ch Post Limited 0.00 Media et diffusion des mess ations Envelope lementation 1 7 3 ains ages (spot TV et Radio, affic hage urbain Abidjan et intéri eur) pour le lancement de la FILT CI-FIRCA-340299-NC-RFQ / Sélection d’un prestataire p Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-1 2023-12-0 our la Conception graphique IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 5 0 7 et production audio-visuel p ains our le lancement de la FILT CI-FIRCA-340300-NC-RFQ / Component 2: Improving ac Sélection d’un prestataire p Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-1 2023-12-0 IDA / 69350 cess to finance for value ch Post Limited 0.00 our la logistique dans le cad ations Envelope lementation 6 1 8 ains re du lancement de la FILT CI-FIRCA-345623-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-06-0 2023-11-3 Sélection d'un prestataire p IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 8 3 0 our la maintenance des app areils électriques CI-FIRCA-345626-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-0 2023-12-0 Sélection d'un prestataire p IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 0 5 2 our la maintenance du maté riels informatiques CI-FIRCA-345630-NC-RFQ / Component 4: Project Coor Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-0 2023-12-0 Sélection d'un prestataire p IDA / 69350 Post Limited 0.00 dination and Management ations Envelope lementation 0 5 2 our la maintenance de la plo mberie sanitaire. CI-FIRCA-352346-NC-RFQ / Component 3: Policy Refor Souscription d'une police d' Request for Quot Single Stage - One Pending Imp 2023-04-0 2023-05-3 2023-11-2 IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 assurance pour les motos d ations Envelope lementation 5 1 7 cement es agences d’exécution du P CCET (240 Motos) CI-FIRCA-354359-NC-RFQ / Component 3: Policy Refor Sélection d'un prestataire p Request for Quot Single Stage - One Pending Imp 2023-04-1 2023-06-1 2023-12-0 IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 our la production audiovisue ations Envelope lementation 5 0 7 cement lle pour le lancement de la F ILT CI-FIRCA-359531-NC-RFQ / Component 2: Improving ac Souscription à une police d' Request for Quot Single Stage - One Pending Imp 2023-05-2 2023-07-2 2024-01-1 IDA / 69350 cess to finance for value ch Post Limited 0.00 assurance multirisque profe ations Envelope lementation 7 2 8 ains ssionnelle pour le siège de l a FIlT CI-FIRCA-359537-NC-DIR / S élection directe de Rehobot h pour la maintenance des f Component 4: Project Coor Pending Imp 2023-05-1 2023-05-2 2023-06-2 2023-12-2 IDA / 69350 Post Direct Selection Direct - National 0.00 ontaines d'eau et fourniture dination and Management lementation 5 0 4 1 de bonbonnes d'eaux dans l es deux locaux du PCCET et de la FILT CI-FIRCA-362233-NC-RFB / Component 2: Improving ac Sélection d'un prestataire p Open - Internation Single Stage - One 2023-06-1 2023-06-1 2023-07-2 2023-08-2 2023-10-0 2024-03-3 IDA / 69350 cess to finance for value ch Post Request for Bids 0.00 Canceled our l’hébergement du SIG m al Envelope 2 7 9 8 2 0 ains utualisé pendant une durée de 5 ans CI-FIRCA-362236-NC-RFB / Component 2: Improving ac Sélection d'un prestataire p Open - Internation Single Stage - One 2023-06-1 2023-06-2 2023-08-0 2023-09-0 2023-10-0 2024-04-0 IDA / 69350 cess to finance for value ch Post Request for Bids 0.00 Canceled our la maintenance du SIG al Envelope 9 4 5 4 9 6 ains mutualisé pendant 5 ans CI-FIRCA-366319-GO-RFQ / Sélection d’un prestataire p our l’hébergement et la sup Component 2: Improving ac Request for Quot Single Stage - One Pending Imp 2023-07-0 2023-08-2 2024-02-2 ervision de l’infrastructure t IDA / 69350 cess to finance for value ch Post Limited 0.00 ations Envelope lementation 4 9 5 echnique d’un Système d’Inf ains ormation et de Gestion (SIG) mutualisé pour les Institutio ns de Microfinance (IMF) en gagées (11 IMF) CONSULTING FIRMS Activity Reference No. / Short List and Draft Combined Evaluatio Loan / Credit Market Approa Contract Type Actual Amount Process Statu Expression of Interes Request for Proposal Opening of Technical Evaluation of Techni Description Component Review Type Method Terms of Reference Request for Proposal n Report and Draft N Signed Contract Contract Completion No. ch (US$) s t Notice s as Issued Proposals / Minutes cal Proposal s egotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIRCA-191930-CS-CQS / Component 2: Improving ac Recrutement d'une assistan Consultant Qualif 2020-12-3 2021-01-3 2021-03-0 2021-09-0 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2020-12-17 ce du Fonds Stratégique d'In ication Selection 1 0 6 2 ains vestissement (FSI) (executiv e assistante) CI-FIRCA-189556-CS-CQS / Recrutement d'un cabinet p our l'évaluation de la deman de afin d'évaluer la réserve Component 4: Project Coor Consultant Qualif 2020-10-1 2020-11-2 2020-12-2 2021-02-0 2021-08-0 / Post Open - National 0.00 Canceled 2020-09-25 potentielle de PME éligibles dination and Management ication Selection 6 9 9 2 1 à ce type de financement d ans le cadre de la plateform e de marché numérique pou r les prêts aux PME CI-FIRCA-189462-CS-CQS / Recrutement d'un cabinet p Component 2: Investments Consultant Qualif 2020-12-2 2021-02-0 2021-03-0 2021-04-1 2021-10-0 our réaliser l'étude de faisa IDA / V3490 Post Open - National 0.00 Canceled 2020-12-01 to Support Value Chains ication Selection 2 4 6 0 7 bilité sur un Centre Technol ogique pour l'ingénierie légè re (générale) CI-FIRCA-256911-CS-QCBS / Component 2: Improving ac Recrutement d'une firme int Quality And Cost- Open - Internation 2022-02-1 2022-01-2 2022-03-0 2022-03-1 2022-04-0 2022-05-0 2022-06-1 2022-07-1 2023-07-1 IDA / 69360 cess to finance for value ch Post 0.00 Canceled 2022-01-05 ernationale pour la mise en Based Selection al 6 6 1 1 8 8 2 7 7 ains place du SIG et son utilisatio n CI-FIRCA-256940-CS-QCBS / Recrutement d'un consultan Component 1: Improving th Quality And Cost- Open - Internation Under Implemen 2021-11-0 2021-12-1 2021-11-3 2022-01-2 2022-02-2 2022-03-2 2022-04-2 2022-06-0 2023-06-0 t (firme) international pour r IDA / 69360 e Competitiveness of Suppo Post 0.00 2021-11-22 Based Selection al tation 2 3 0 6 3 5 9 3 3 enforcer des capacités des c rted Value Chains onsultants de compétitivité des chaines de valeur CI-FIRCA-256944-CS-QCBS / Component 2: Improving ac Quality And Cost- Under Implemen 2022-01-2 2021-12-1 2022-01-2 2022-02-2 2022-03-2 2022-04-2 2022-06-0 2023-06-0 Recrutement d'un Auditeur ( IDA / 69360 cess to finance for value ch Post Open - National 0.00 2021-11-22 Based Selection tation 8 3 6 3 5 9 3 3 firme) local ains CI-FIRCA-257196-CS-CQS / Sélection d’un cabinet pour Component 3: Policy Refor Quality And Cost- 2021-12-1 2022-01-2 2022-02-2 2022-03-2 2022-04-3 2022-06-0 2023-06-0 la Conception du modèle éc IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2021-11-23 Based Selection 4 7 4 6 0 4 4 onomique et financier des g cement estions des zones industriell es CI-FIRCA-257198-CS-QCBS / Sélection d’un cabinet pour Component 3: Policy Refor Quality And Cost- 2021-12-0 2022-01-2 2022-02-1 2022-03-1 2022-04-2 2022-05-2 2023-05-2 l’élaboration du modèle fina IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2021-11-16 Based Selection 7 0 7 9 3 8 8 ncier et définition de la strat cement égie de financement du FOD I CI-FIRCA-256894-CS-QCBS / Recrutement d'une firme loc Component 2: Improving ac ale pour le développement i Quality And Cost- 2022-02-1 2022-03-3 2022-04-2 2022-05-2 2022-07-0 2022-08-0 2023-08-0 IDA / 69360 cess to finance for value ch Post Open - National 0.00 Canceled 2022-01-25 nformatique de la plateform Based Selection 5 1 8 8 2 6 6 ains e d'auto-apprentissage- dév eloppeur informatique (serv er / hardware / software) CI-FIRCA-256916-CS-QCBS / Recrutement d'une firme int Component 2: Improving ac Quality And Cost- 2022-02-1 2022-03-3 2022-04-2 2022-05-2 2022-07-0 2022-08-0 2023-08-0 ernationale pour la mise en IDA / 69360 cess to finance for value ch Post Open - National 0.00 Canceled 2022-01-25 Based Selection 5 1 8 8 2 6 6 place du SIG et son utilisatio ains n (préparation de DAO, assi stance technique etc.) CI-FIRCA-257203-CS-QCBS / Sélection d’une firme pour a Component 3: Policy Refor Quality And Cost- 2022-01-1 2022-02-2 2022-03-2 2022-04-2 2022-05-2 2022-07-0 2023-07-0 ppuyer le déploiement des s IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2021-12-22 Based Selection 2 5 5 4 9 3 3 ervices de l'AGEDI sur les sit cement es des zones industrielles - AGEDI CI-FIRCA-257042-CS-QCBS / Sélection d’un cabinet pour Component 1: Improving th la réalisation l’Etude de fais Quality And Cost- 2022-04-1 2022-06-0 2022-06-3 2022-07-3 2022-09-0 2022-10-0 2023-10-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-03-29 abilité pour la réalisation de Based Selection 9 2 0 0 3 8 8 rted Value Chains l’installation pilote de produ ction et d’essai de produits pour l'hévéa CI-FIRCA-257201-CS-QCBS / Sélection d’une firme pour l Component 3: Policy Refor Quality And Cost- 2022-01-1 2022-02-2 2022-03-2 2022-04-2 2022-05-3 2022-07-0 2023-07-0 a mise en place d'un systèm IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2021-12-23 Based Selection 3 6 6 5 0 4 4 e de suivi-évaluation des inf cement rastructures industrielles - A GEDI CI-FIRCA-256952-CS-QCBS / Recrutement d'un consultan Component 1: Improving th Quality And Cost- 2022-10-1 2022-11-2 2022-12-2 2023-01-2 2023-02-2 2023-04-0 2024-03-3 t pour préparer des spécific IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-09-20 Based Selection 1 4 2 1 5 1 1 ations techniques des PPPTF rted Value Chains (études pour le palmier à l'h uile) CI-FIRCA-257114-CS-QCBS / Recrutement de cabinets po Component 2: Improving ac ur les Formations continues Quality And Cost- 2022-02-0 2022-03-1 2022-04-1 2022-05-1 2022-06-1 2022-07-2 2023-07-2 IDA / 69360 cess to finance for value ch Post Open - National 0.00 Canceled 2022-01-11 CDC-CI sur 6 ans (Comptabil Based Selection 1 7 4 4 8 3 3 ains ité et FM, Passation de Marc hé, management de fonds, simulations financières etc.) CI-FIRCA-256887-CS-QCBS / Sélection d’une firme pour l Component 1: Improving th e système d'exploitation. Du Quality And Cost- 2021-11-3 2022-01-1 2022-02-1 2022-03-1 2022-04-1 2022-05-2 2023-05-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2021-11-09 rée indéterminée, sur la bas Based Selection 0 3 0 2 6 1 1 rted Value Chains e des frais de transaction, le projet paie les premiers $10 0 000 CI-FIRCA-256949-CS-QCBS / Recrutement d'un consultan Component 1: Improving th Quality And Cost- 2022-01-1 2022-02-2 2022-03-2 2022-04-2 2022-05-3 2022-07-0 2023-07-0 t pour préparer des spécific IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2021-12-23 Based Selection 3 6 6 5 0 4 4 ations techniques des PPPTF rted Value Chains (études pour le plastique) Page 5 CI-FIRCA-258154-CS-QCBS / Sélection d’un cabinet pour Component 3: Policy Refor Quality And Cost- 2021-12-1 2022-01-2 2022-02-2 2022-03-2 2022-04-2 2022-06-0 2023-06-0 l’appui à la mise en place d' IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2021-11-22 Based Selection 3 6 3 5 9 3 3 une cellule renforcée de pas cement sation des marchés publics - AGEDI CI-FIRCA-257028-CS-QCBS / Component 1: Improving th Sélection d’un cabinet pour Quality And Cost- 2023-06-0 2023-07-1 2023-08-1 2023-09-1 2023-10-2 2023-11-2 2024-11-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2023-05-15 réaliser les études pour la p Based Selection 5 9 6 5 0 4 3 rted Value Chains réparation des mécanismes d'investissements CI-FIRCA-256950-CS-QCBS / Component 1: Improving th Recrutement d'un consultan Quality And Cost- 2022-10-1 2022-11-2 2022-12-2 2023-01-2 2023-02-2 2023-04-0 2024-04-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-09-21 t pour préparer des spécific Based Selection 2 5 3 2 6 2 1 rted Value Chains ations techniques des PPPTF (études pour l’hévéa) CI-FIRCA-256391-CS-QCBS / Sélection d’un cabinet pour Component 1: Improving th la réalisation des études de Quality And Cost- 2022-04-1 2022-05-2 2022-06-2 2022-07-2 2022-08-2 2022-09-3 2023-09-3 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-03-21 faisabilité pour la réalisation Based Selection 1 5 2 2 6 0 0 rted Value Chains de l’installation pilote de pro duction et d’essai de produit s pour palmier à l'huile CI-FIRCA-256892-CS-QCBS / Sélection d’un cabinet pour Component 2: Improving ac Quality And Cost- 2022-03-0 2022-04-1 2022-05-1 2022-06-1 2022-07-1 2022-08-2 2023-08-2 la réalisation des Etudes po IDA / 69360 cess to finance for value ch Post Open - National 0.00 Canceled 2022-02-08 Based Selection 1 4 2 1 6 0 0 ur la préparation des mécan ains ismes d'investissements CI-FIRCA-189682-CS-CQS / Component 1: Improving th Recrutement d'un cabinet p Consultant Qualif 2020-10-2 2020-11-1 2021-05-2 IDA / V3490 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2020-10-19 our former et coacher les sp ication Selection 3 0 6 rted Value Chains écialistes clusters économiq ues CI-FIRCA-189487-CS-CQS / Component 2: Improving ac Recrutement d'un cabinet e Consultant Qualif 2020-12-3 2021-02-1 2021-03-1 2021-04-1 2021-10-1 IDA / V3490 cess to finance for value ch Post Open - National 0.00 Canceled 2020-12-09 n charge d'évaluer les besoi ication Selection 0 2 4 8 5 ains ns des IMF en MCBS (inclut préparation de RFP) CI-FIRCA-257037-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th Consultant Qualif 2022-05-1 2022-06-3 2022-07-3 2022-09-0 2023-03-0 le Suivi et contrôle de la con IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-04-26 ication Selection 7 0 0 3 2 struction de l’installation pil rted Value Chains ote de production et d’essai de produits pour le plastiqu e CI-FIRCA-257043-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th la réalisation des études tec Consultant Qualif 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2023-05-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-06-29 hnique et architecturale pou ication Selection 0 2 2 6 5 rted Value Chains r l’installation pilote de prod uction et d’essai de produits hévéa CI-FIRCA-257030-CS-CQS / Component 1: Improving th Sélection d’un cabinet pour Consultant Qualif 2022-01-3 2022-03-1 2022-04-1 2022-05-2 2022-11-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-01-10 la réalisation des études en ication Selection 1 6 5 0 6 rted Value Chains vironnementales et sociales des points de collectes CI-FIRCA-257035-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th la réalisation des études tec Consultant Qualif 2022-02-1 2022-04-0 2022-05-0 2022-06-0 2022-12-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-01-26 hnique et architecturale pou ication Selection 6 1 1 5 2 rted Value Chains r l’installation pilote de prod uction et d’essai de produits pour le plastique CI-FIRCA-256947-CS-CQS / Recrutement d'un consultan t (firme) international pour Component 1: Improving th préparer des Procédures op Consultant Qualif Open - Internation 2021-11-2 2022-01-0 2022-02-0 2022-03-1 2022-09-0 IDA / 69360 e Competitiveness of Suppo Post 0.00 Canceled 2021-11-01 érationnelles standards pou ication Selection al 2 5 4 1 7 rted Value Chains r une unité mobile hors rése au de traitement et de condi tionnement à l'eau chaude pour les mangues et autres fruits tropicaux CI-FIRCA-256886-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th la réalisation du Suivi et con Consultant Qualif 2022-11-2 2023-01-1 2023-02-1 2023-03-1 2023-09-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-11-08 trôle de la construction de l’ ication Selection 9 2 1 8 4 rted Value Chains installation pilote de produc tion et d’essai de produits p our le palmier à l'huile CI-FIRCA-191893-CS-CQS / Recrutement d'un cabinet p Component 2: Improving ac Consultant Qualif 2021-01-0 2021-02-2 2021-03-2 2021-04-2 2021-10-2 our élaborer " the trainers o IDA / V3490 cess to finance for value ch Post Open - National 0.00 Canceled 2020-12-17 ication Selection 7 0 2 6 3 nline courses" pour les supe ains rviseurs (DRSSFD) + on-the -job training CI-FIRCA-189484-CS-CQS / Recrutement d'un cabinet p Component 2: Investments Consultant Qualif 2020-12-2 2021-02-0 2021-03-0 2021-04-1 2021-10-0 IDA / V3490 Post Open - National 0.00 Canceled 2020-12-01 our réaliser le diagnostique to Support Value Chains ication Selection 2 4 6 0 7 de la chaine frigorifique CIV CI-FIRCA-254895-CS-CQS / Component 1: Improving th Recrutement d’un Cabinet d Consultant Qualif Open - Internation 2021-10-2 2021-12-0 2022-01-0 2022-02-0 2022-08-0 IDA / V3490 e Competitiveness of Suppo Post 0.00 Canceled 2021-09-30 ’audit international pour la r ication Selection al 1 4 3 7 6 rted Value Chains édaction du manuel des opé rations de la LTIF CI-FIRCA-256604-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th la réalisation des études tec Consultant Qualif 2022-06-2 2022-08-1 2022-09-1 2022-10-1 2023-04-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-06-08 hnique et architecturale pou ication Selection 9 2 1 6 4 rted Value Chains r l’installation pilote de prod uction et d’essai de produits pour le palmier à l'huile CI-FIRCA-189473-CS-CQS / Recrutement d'un cabinet p our la mise en place des pro Component 2: Investments Consultant Qualif 2020-12-1 2021-01-3 2021-03-0 2021-04-0 2021-10-0 cédures opérationnelles sta IDA / V3490 Post Open - National 0.00 Canceled 2020-11-27 to Support Value Chains ication Selection 8 1 2 6 3 ndard ("Standard Operating Procedures") pour le service logistique à température co ntrôlé pour la mangue et au tre CI-FIRCA-258878-CS-CQS / Component 2: Improving ac Consultant Qualif 2022-01-1 2022-02-2 2022-03-2 2022-04-3 2022-10-2 Recrutement d’une firme int IDA / 69360 cess to finance for value ch Post Open - National 0.00 Canceled 2021-12-21 ication Selection 1 4 6 0 7 ernationale pour la promotio ains n de la LTIF CI-FIRCA-257044-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th la réalisation des études en Consultant Qualif 2022-05-1 2022-07-0 2022-08-0 2022-09-0 2023-03-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-04-28 vironnementales du site dev ication Selection 9 2 1 5 4 rted Value Chains ant recevoir l’installation pil ote de production et d’essai de produits hévéa CI-FIRCA-256385-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th la réalisation du Suivi et con Consultant Qualif 2022-04-2 2022-06-0 2022-07-0 2022-08-1 2023-02-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-04-05 trôle de la construction de l’ ication Selection 6 9 9 3 9 rted Value Chains installation pilote de produc tion et d’essai de produits p our l ‘hévéa CI-FIRCA-283030-CS-CQS / RECRUTEMENT D'UN CABIN Component 2: Improving ac Consultant Qualif 2022-05-2 2022-07-0 2022-08-0 2022-09-0 2023-03-0 ET EN VUE DE L'ASSISTANC IDA / 69360 cess to finance for value ch Post Open - National 0.00 Canceled 2022-04-29 ication Selection 0 3 2 6 5 E SUR LA STRUCTURATION E ains T LA REDACTION DES DOCU MENTS JURIDIQUES DE LA FI LT CI-FIRCA-254897-CS-CQS / Recrutement d’un Cabinet d Component 1: Improving th Consultant Qualif Open - Internation 2021-10-2 2021-12-0 2022-01-0 2022-02-0 2022-08-0 e conseil international pour IDA / V3490 e Competitiveness of Suppo Post 0.00 Canceled 2021-09-30 ication Selection al 1 4 3 7 6 des opérations de bechmark rted Value Chains s et de renforcement techni que de la CDC/LTIF CI-FIRCA-257179-CS-QCBS / Sélection d’un cabinet pour réaliser l’Etude Technique ( Component 3: Policy Refor Quality And Cost- Open - Internation 2023-01-0 2023-02-2 2023-03-2 2023-04-1 2023-05-2 2023-06-2 2024-06-2 Conception, APS) pour le dé IDA / 69360 ms and Institutional Reinfor Post 0.00 Canceled 2022-12-17 Based Selection al 7 0 0 9 4 8 7 placement du passage supé cement rieur principal et la réalisati on de bretelles d'accès au ni veau des voies structurante s CI-FIRCA-257193-CS-QCBS / Sélection d’un cabinet pour Component 3: Policy Refor Quality And Cost- Open - Internation 2023-01-2 2023-03-0 2023-04-0 2023-05-0 2023-06-0 2023-07-1 2024-07-1 la réalisation de l’Etude Tec IDA / 69360 ms and Institutional Reinfor Post 0.00 Canceled 2022-12-30 Based Selection al 0 5 2 2 6 1 0 hnique (Conception, APS) po cement ur l'aménagement de l'écha ngeur Nord Est CI-FIRCA-257175-CS-QCBS / Recrutement d’un cabinet d Component 3: Policy Refor Quality And Cost- Open - Internation 2022-12-0 2023-01-1 2023-02-1 2023-03-1 2023-04-2 2023-05-2 2024-05-2 evant réaliser la mise en pla IDA / 69360 ms and Institutional Reinfor Post 0.00 Canceled 2022-11-15 Based Selection al 6 9 6 8 2 7 6 ce d’un système d’informati cement ons géographique des zones industrielles CI-FIRCA-256891-CS-CQS / Component 1: Improving th Recrutement d'un cabinet p Consultant Qualif 2021-12-2 2022-02-0 2022-03-1 2022-04-1 2022-10-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2021-12-06 our développer les Applicati ication Selection 7 9 1 5 2 rted Value Chains ons logicielles blockchain. CI-FIRCA-256889-CS-QCBS / Sélection ‘un cabinet pour la Component 1: Improving th gestion et l'hébergement de Quality And Cost- 2021-12-1 2022-01-2 2022-02-2 2022-03-2 2022-04-3 2022-06-0 2023-06-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2021-11-23 s données - Définir l'architec Based Selection 4 7 4 6 0 4 4 rted Value Chains ture et mettre en place et m aintenir les bases de donné es des différents nœuds. CI-FIRCA-256616-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th la réalisation des études en Consultant Qualif 2021-12-0 2022-01-2 2022-02-1 2022-03-2 2022-09-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2021-11-16 vironnementales du site dev ication Selection 7 0 9 6 2 rted Value Chains ant recevoir l’installation pil ote de production et d’essai de produits pour le palmier à l'huile CI-FIRCA-257034-CS-QCBS / Sélection d’un cabinet pour Component 1: Improving th la réalisation des études de Quality And Cost- 2021-11-2 2022-01-0 2022-02-0 2022-03-0 2022-04-0 2022-05-1 2023-05-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2021-11-02 faisabilité pour la réalisation Based Selection 3 6 3 5 9 4 4 rted Value Chains de l’installation pilote de pro duction et d’essai de produit s pour le plastique CI-FIRCA-257036-CS-CQS / Sélection d’un cabinet pour Component 1: Improving th la réalisation des études en Consultant Qualif 2021-12-2 2022-02-0 2022-03-0 2022-04-1 2022-10-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2021-12-01 vironnementales du site dev ication Selection 2 4 6 0 7 rted Value Chains ant recevoir l’installation pil ote de production et d’essai de produits pour le Plastiqu es Page 6 CI-FIRCA-257169-CS-QCBS / Component 3: Policy Refor Recrutement d’une firme po Quality And Cost- Open - Internation 2023-01-1 2023-03-0 2023-03-3 2023-04-2 2023-06-0 2023-07-0 2024-07-0 IDA / 69360 ms and Institutional Reinfor Post 0.00 Canceled 2022-12-27 ur la dématérialisation des p Based Selection al 7 2 0 9 3 8 7 cement rocédures de gestion des te rrains industriels CI-FIRCA-291627-CS-QCBS / Recrutement d’une firme po Component 2: Improving ac Quality And Cost- Pending Implem 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2022-12-0 2023-01-1 2024-01-1 ur implémenter un système IDA / 69360 cess to finance for value ch Post Open - National 0.00 2022-07-04 Based Selection entation 5 7 5 4 9 3 3 d’information et de gestion ( ains SIG) mutualisé pour les insti tutions de microfinance (IMF ) CI-FIRCA-291636-CS-CQS / Recrutement d’un cabinet p Component 4: Project Coor Consultant Qualif Under Implemen 2022-09-2 2022-06-0 2022-10-1 2022-07-2 2022-08-1 2022-09-2 2023-03-2 IDA / 69360 Post Open - National 0.00 2022-05-16 our la création et la mainten dination and Management ication Selection tation 6 6 8 0 9 3 2 ance du site internet du PCC ET sur la durée du projet CI-FIRCA-291637-CS-CQS / Recrutement d’un Cabinet p Component 3: Policy Refor Consultant Qualif Pending Implem 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2023-05-0 our la conception et la réalis IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 2022-07-01 ication Selection entation 2 4 4 8 7 ation de la plateforme de dé cement livrance des licences et per mis d'affaires en ligne CI-FIRCA-291638-CS-CQS / Recrutement d'un Cabinet p Component 1: Improving th our entreprendre une étude Consultant Qualif Under Implemen 2022-05-2 2022-06-0 2022-06-0 2022-07-2 2022-08-2 2022-09-2 2023-03-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-05-17 d'évaluation du paysage inf ication Selection tation 3 7 7 1 0 4 3 rted Value Chains ormatique ivoirien, y compri s les capacités de la technol ogie Blockchain CI-FIRCA-291639-CS-CQS / Recrutement d'un Cabinet p Component 1: Improving th our développer et maintenir Consultant Qualif Pending Implem 2022-07-2 2022-09-0 2022-10-0 2022-11-1 2023-05-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-07-04 les applications logicielles n ication Selection entation 5 7 7 1 0 rted Value Chains umériques (ex. technologie Blockchain) et former les pri ncipaux utilisateurs CI-FIRCA-291643-CS-CQS / Recrutement d’un Cabinet p Component 3: Policy Refor Consultant Qualif Pending Implem 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2023-05-0 our la conception et la réalis IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 2022-07-01 ication Selection entation 2 4 4 8 7 ation de la version 2 de la pl cement ateforme de création d'entr eprises en ligne (e-gufe 2.0) CI-FIRCA-291644-CS-CQS / Sélection ‘un cabinet pour la Component 1: Improving th gestion et l'hébergement de Consultant Qualif 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-01 s données - Définir l'architec ication Selection 2 5 4 9 7 rted Value Chains ture et mettre en place et m aintenir les bases de donné es des différents nœuds CI-FIRCA-291646-CS-CQS / Recrutement d'un Cabinet p Component 1: Improving th our l'évaluation des besoins Consultant Qualif 2022-06-0 2022-07-2 2022-08-1 2022-09-2 2023-03-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-05-16 immédiats en équipements, ication Selection 6 0 9 3 2 rted Value Chains services, fourniture et infras tructures clefs dans la chaîn e de valeur mangue CI-FIRCA-291647-CS-CQS / Recrutement d'un Cabinet p Component 1: Improving th our l'évaluation des besoins Consultant Qualif 2022-06-0 2022-07-2 2022-08-1 2022-09-2 2023-03-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-05-16 immédiats en équipements, ication Selection 6 0 9 3 2 rted Value Chains services, fourniture et infras tructures clefs dans la chaîn e de valeur ananas CI-FIRCA-291648-CS-CQS / Recrutement d’un Cabinet p Component 3: Policy Refor Consultant Qualif Pending Implem 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2023-05-0 our la réalisation des études IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 2022-07-01 ication Selection entation 2 4 4 8 7 environnementales et social cement es pour la clôture de la zone industrielle d’Adzopé CI-FIRCA-291649-CS-CQS / Recrutement d'un Cabinet p Component 1: Improving th our l'évaluation des besoins Consultant Qualif 2022-06-1 2022-07-2 2022-08-2 2022-09-3 2023-03-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-05-23 immédiats en équipements, ication Selection 3 7 6 0 9 rted Value Chains services, fourniture et infras tructures clefs dans la chaîn e de valeur hévéa et le plast ique CI-FIRCA-291650-CS-CQS / Recrutement d'un Cabinet p Component 1: Improving th our l'évaluation des besoins Consultant Qualif 2022-06-0 2022-07-2 2022-08-1 2022-09-2 2023-03-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-05-16 immédiats en équipements, ication Selection 6 0 9 3 2 rted Value Chains services, fourniture et infras tructures clefs dans la chaîn e de valeur palmier à huile CI-FIRCA-291652-CS-CQS / Recrutement d'un Cabinet p Component 1: Improving th our l'évaluation des besoins Consultant Qualif 2022-06-0 2022-07-2 2022-08-2 2022-09-2 2023-03-2 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-05-18 immédiats en équipements, ication Selection 8 2 1 5 4 rted Value Chains services, fourniture et infras tructures clefs dans la chaîn e de valeur karité CI-FIRCA-291666-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our une assistance financièr Consultant Qualif 2022-06-2 2022-08-0 2022-09-0 2022-10-0 2023-04-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-06-01 e et fiscale de l’UC-PCCET p ication Selection 2 5 4 9 7 rted Value Chains our l’installation pilote de pr oduction et d’essais pour le caoutchouc naturel et le pla stique CI-FIRCA-291667-CS-CQS / Recrutement d’un cabinet p our la réalisation des études environnementales et social Component 1: Improving th Consultant Qualif Pending Implem 2022-06-2 2022-08-0 2022-09-0 2022-10-0 2023-04-0 es de l’installation de produ IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-06-01 ication Selection entation 2 5 4 9 7 ction d’énergie renouvelabl rted Value Chains e à base de résidus de trans formation des matières pre mières agricoles (hévéa, pal mier à huile, ananas, mangu e anaca CI-FIRCA-291672-CS-CQS / Recrutement d’un Cabinet p our une assistance juridique de l’UC-PCCET pour l’installa Component 1: Improving th Consultant Qualif Under Implemen 2022-09-0 2022-06-2 2022-09-1 2022-08-0 2022-09-0 2022-10-1 2023-04-0 tion de production d’énergie IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-06-02 ication Selection tation 9 3 5 6 5 0 8 renouvelable à base de rési rted Value Chains dus de transformation des matières premières agricole s (hévéa, palmier à huile, an anas, mangue et anacarde) CI-FIRCA-291675-CS-CQS / Recrutement d’un Cabinet p our une assistance techniqu e de l’UC-PCCET et le suivi d Component 1: Improving th Consultant Qualif Under Implemen 2022-09-1 2022-06-2 2022-09-1 2022-08-1 2022-09-0 2022-10-1 2023-04-1 es travaux pour l’unité de pr IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-06-06 ication Selection tation 2 7 5 0 9 4 2 oduction d’énergie renouvel rted Value Chains able à base de résidus de tr ansformation des matières premières agricoles (hévéa, palmier, ananas, mangue, a nacarde) CI-FIRCA-291676-CS-CQS / Recrutement d’un Cabinet p our une assistance financièr e et fiscale de l’UC-PCCET p Component 1: Improving th Consultant Qualif 2022-06-2 2022-08-0 2022-09-0 2022-10-0 2023-04-0 our l’installation de producti IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-06-01 ication Selection 2 5 4 9 7 on d’énergie renouvelable rted Value Chains à base de résidus de transfo rmation des matières premi ères agricoles (hévéa, palmi er à huile, ananas, mangue et ana CI-FIRCA-291684-CS-QCBS / Recrutement d’une firme po ur implémenter un système Component 3: Policy Refor numérique de planification Quality And Cost- 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2022-12-0 2023-01-1 2024-01-1 IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2022-07-01 de la récolte et de cartograp Based Selection 2 4 2 1 6 0 0 cement hie des sols dans les zones de production de l’hévéa, d u palmier á huile, de l’anana s et de la mangue CI-FIRCA-291685-CS-QCBS / Recrutement d’une firme po Component 3: Policy Refor Quality And Cost- Open - Internation Under Implemen 2023-02-2 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2022-12-0 2023-01-1 2024-01-1 ur la conception et l’opérati IDA / 69360 ms and Institutional Reinfor Post 0.00 2022-07-01 Based Selection al tation 2 2 4 2 1 6 0 0 onnalisation du SIGETI (com cement prenant notamment un mod ule SIG) CI-FIRCA-291688-CS-CQS / Component 3: Policy Refor Recrutement d’un Cabinet p Consultant Qualif Pending Implem 2022-07-2 2022-09-0 2022-10-0 2022-11-1 2023-05-1 IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 2022-07-04 our la réalisation des techni ication Selection entation 5 7 7 1 0 cement ques pour la clôture de la zo ne industrielle d’Adzopé CI-FIRCA-295092-CS-CQS / Recrutement d’un intermédi Component 1: Improving th Consultant Qualif Pending Implem 2022-09-2 2022-11-1 2022-12-1 2023-01-1 2023-07-1 aire financier dans le cadre IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-09-06 ication Selection entation 7 0 0 4 3 de la mise en œuvre du méc rted Value Chains anisme des subventions à c oûts partagés (SCP) CI-FIRCA-295099-CS-CQS / Recrutement d’un cabinet p our la réalisation des études Component 1: Improving th Consultant Qualif Pending Implem 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 environnementales et social IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 ication Selection entation 2 5 4 9 7 es de chambres froides de c rted Value Chains onservation des produits ag ricoles dont les fruits (ex. m angue et ananas) et le Karit é CI-FIRCA-295103-CS-QCBS / Recrutement d’un Cabinet p our le Suivi et le contrôle de Component 1: Improving th Quality And Cost- Pending Implem 2022-10-1 2022-11-2 2022-12-2 2023-01-2 2023-02-2 2023-03-3 2024-03-3 la construction de chambres IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-09-19 Based Selection entation 0 3 1 0 4 1 0 froides de conservation des rted Value Chains produits agricoles dont les fr uits (ex. mangue et ananas) et le Karité CI-FIRCA-295104-CS-QCBS / Recrutement d’une firme po ur implémenter un système Component 1: Improving th numérique de planification Quality And Cost- Under Implemen 2022-07-1 2022-12-0 2023-01-1 2023-02-1 2023-03-1 2023-04-2 2023-05-2 2024-05-2 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-11-14 de la récolte et de cartograp Based Selection tation 9 5 8 5 7 1 6 5 rted Value Chains hie des sols dans les zones de production de l’hévéa, d u palmier á huile, de l’anana s, de la mangue et du Karité CI-FIRCA-295107-CS-CQS / Recrutement d'un Cabinet p Component 1: Improving th our l'évaluation des besoins Consultant Qualif 2022-08-1 2022-09-2 2022-10-2 2022-12-0 2023-05-3 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-07-25 immédiats en équipements, ication Selection 5 8 8 2 1 rted Value Chains services, fourniture et infras tructures clefs dans la chaîn e du Karité Page 7 CI-FIRCA-295106-CS-CQS / Recrutement d’un Cabinet p our l’élaboration du plan de Component 3: Policy Refor masse de la zone industriell Consultant Qualif 2022-06-2 2022-08-0 2022-09-0 2022-10-1 2023-04-0 IDA / 69350 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2022-06-02 e Akoupé-Zeudji (PK24) dan ication Selection 3 6 5 0 8 cement s le cadre de la réalisation des études techniques pour l'embranchement de la voie Y4 à ladite zone industrielle CI-FIRCA-295109-CS-CQS / Recrutement d’un Cabinet p our une assistance financièr e de l’UC-PCCET pour l’instal Component 1: Improving th Consultant Qualif Under Implemen 2022-09-1 2022-08-2 2022-09-1 2022-10-0 2022-11-0 2022-12-0 2023-06-0 lation de production d’énerg IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 ication Selection tation 3 2 5 5 4 9 7 ie renouvelable à base de ré rted Value Chains sidus de transformation des matières premières agricole s (hévéa, palmier à huile, an anas, mangue et anacarde) CI-FIRCA-295110-CS-CQS / Recrutement d’un Cabinet p our une assistance fiscale d e l’UC-PCCET pour l’installati Component 1: Improving th Consultant Qualif Under Implemen 2022-11-2 2022-08-2 2022-09-1 2022-10-0 2022-11-0 2022-12-0 2023-06-0 on de production d’énergie r IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 ication Selection tation 8 2 5 5 4 9 7 enouvelable à base de rési rted Value Chains dus de transformation des matières premières agricole s (hévéa, palmier à huile, an anas, mangue et anacarde) CI-FIRCA-295121-CS-QCBS / Recrutement d'un Cabinet p Component 1: Improving th our réaliser les études techn Quality And Cost- 2022-09-1 2022-10-2 2022-11-2 2022-12-2 2023-01-2 2023-03-0 2024-03-0 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-22 iques de construction d’une Based Selection 2 6 3 3 7 3 2 rted Value Chains usine moderne de transform ation de fruits (mangue, ana nas…) CI-FIRCA-295122-CS-CQS / Recrutement d’un cabinet p Component 1: Improving th our la réalisation des études Consultant Qualif Pending Implem 2022-09-2 2022-11-0 2022-12-0 2023-01-0 2023-07-0 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-09-01 environnementales et social ication Selection entation 2 5 5 9 8 rted Value Chains es pour la construction d’un e usine moderne de transfor mation de fruits (mangue, a nanas…) CI-FIRCA-295123-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our une assistance financièr Consultant Qualif 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-01 e de l’UC-PCCET pour la con ication Selection 2 5 4 9 7 rted Value Chains struction d’une usine moder ne de transformation de frui ts (mangue, ananas…) CI-FIRCA-295124-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our une assistance fiscale d Consultant Qualif Pending Implem 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 e l’UC-PCCET pour la constr ication Selection entation 2 5 4 9 7 rted Value Chains uction d’une usine moderne de transformation de fruits ( mangue, ananas…) CI-FIRCA-295125-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our une assistance juridique Consultant Qualif Pending Implem 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 de l’UC-PCCET pour la const ication Selection entation 2 5 4 9 7 rted Value Chains ruction d’une usine modern e de transformation de fruit s (mangue, ananas…) CI-FIRCA-295127-CS-CQS / Recrutement d’un Cabinet p our une assistance financièr Component 1: Improving th Consultant Qualif Pending Implem 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 e de l’UC-PCCET pour la con IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 ication Selection entation 2 5 4 9 7 struction de chambres froid rted Value Chains es de conservation des prod uits agricoles dont les fruits (ex. mangue et ananas) et l e Karité CI-FIRCA-295128-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our une assistance fiscale d Consultant Qualif Pending Implem 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 e l’UC-PCCET de chambres f ication Selection entation 2 5 4 9 7 rted Value Chains roides de conservation des produits agricoles dont les fr uits (ex. mangue et ananas) et le Karité CI-FIRCA-295130-CS-CQS / Recrutement d’un Cabinet p our une assistance juridique Component 1: Improving th Consultant Qualif Pending Implem 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 de l’UC-PCCET pour la const IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 ication Selection entation 2 5 4 9 7 ruction de chambres froides rted Value Chains de conservation des produit s agricoles dont les fruits (e x. mangue et ananas) et le Karité CI-FIRCA-301777-CS-CQS / Recrutement d’une firme (O Component 1: Improving th NG, Université, Institutions Consultant Qualif 2022-07-1 2022-09-2 2022-11-0 2022-12-0 2023-01-0 2023-07-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-09-01 …) pour l’assistance techniq ication Selection 9 2 5 5 9 8 rted Value Chains ue à la formation des femm es à l’entreprenariat dans la région Nord du pays CI-FIRCA-301779-CS-CQS / Recrutement d’une firme (O Component 1: Improving th NG, Université, Institutions Consultant Qualif 2022-07-1 2022-09-2 2022-11-0 2022-12-0 2023-01-0 2023-07-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-09-01 …) pour l’assistance techniq ication Selection 9 2 5 5 9 8 rted Value Chains ue à la formation des femm es à l’entreprenariat dans la région Ouest du pays CI-FIRCA-301784-CS-CQS / Recrutement d’une firme (O Component 1: Improving th NG, Université, Institutions Consultant Qualif 2022-07-1 2022-09-2 2022-11-0 2022-12-0 2023-01-0 2023-07-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-09-01 …) pour l’assistance techniq ication Selection 9 2 5 5 9 8 rted Value Chains ue à la formation des femm es à l’entreprenariat dans la région Est du pays CI-FIRCA-301788-CS-CQS / Recrutement d’une firme (O Component 1: Improving th NG, Université, Institutions Consultant Qualif 2022-07-1 2022-09-2 2022-11-0 2022-12-0 2023-01-0 2023-07-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-09-01 …) pour l’assistance techniq ication Selection 9 2 5 5 9 8 rted Value Chains ue à la formation des femm es à l’entreprenariat dans la région Sud du pays CI-FIRCA-301790-CS-CQS / Recrutement d’un Cabinet p Component 4: Project Coor Consultant Qualif 2022-07-2 2022-09-2 2022-11-0 2022-12-0 2023-01-1 2023-07-0 our la mise en place et la m IDA / 69350 Post Open - National 0.00 Canceled 2022-09-02 dination and Management ication Selection 9 3 6 6 0 9 aintenance du logiciel de sui vi évaluation du Projet et la formation des utilisateurs CI-FIRCA-301798-CS-CQS / Recrutement d’une firme (O Component 1: Improving th NG, Université, Institutions Consultant Qualif 2022-07-1 2022-09-2 2022-11-0 2022-12-0 2023-01-0 2023-07-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-09-01 …) pour l’assistance techniq ication Selection 9 2 5 5 9 8 rted Value Chains ue à la formation des femm es à l’entreprenariat dans l a région Centre du pays CI-FIRCA-301804-CS-CQS / Recrutement d’une firme (c abinet, université, centre de Component 1: Improving th Consultant Qualif Under Implemen 2022-09-0 2022-09-2 2022-09-1 2022-11-0 2022-12-0 2023-01-0 2023-07-0 recherche…) pour l’assistan IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-09-01 ication Selection tation 9 2 3 5 5 9 8 ce technique et la formation rted Value Chains dans le cadre de la mise en conformité du laboratoire de pédologie de l’ESA de l'INPH B CI-FIRCA-301809-CS-CQS / Recrutement d'un cabinet p Component 4: Project Coor Consultant Qualif 2022-07-1 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 our l'étude de référence et l IDA / 69360 Post Open - National 0.00 Under Review 2022-08-01 dination and Management ication Selection 8 2 5 4 9 7 a mise en place d'un disposi tif de suivi des impacts du p rojet CI-FIRCA-291663-CS-QCBS / Recrutement d’un Cabinet p our la réalisation des études environnementales et social Component 3: Policy Refor Quality And Cost- 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-01-0 2023-02-1 2024-02-1 es pour l'aménagement de l' IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2022-08-01 Based Selection 2 5 2 2 6 0 0 échangeur Nord-Est de la zo cement ne industrielle dans le cadre de l'embranchement de la v oie Y4 à la zone industrielle Akoupé-Zeudji PK24 CI-FIRCA-291669-CS-QCBS / Recrutement d’un Cabinet p our la réalisation des études techniques (APS, APD, DAO.. Component 3: Policy Refor Quality And Cost- 2022-05-2 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-01-0 2023-02-1 2024-02-1 .) pour l'aménagement de l' IDA / 69360 ms and Institutional Reinfor Post Open - National 0.00 Canceled 2022-08-01 Based Selection 4 2 5 2 2 6 0 0 échangeur Nord-Est de la zo cement ne industrielle dans le cadre de l'embranchement de la v oie Y4 à la zone industrielle Akoupé-Zeudji PK24 CI-FIRCA-295093-CS-QCBS / Recrutement d’un Cabinet p Component 1: Improving th Quality And Cost- Pending Implem 2022-10-1 2022-11-2 2022-12-2 2023-01-2 2023-02-2 2023-03-3 2024-03-3 our le Suivi et le contrôle de IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-09-19 Based Selection entation 0 3 1 0 4 1 0 la construction de l’installati rted Value Chains on de production pour le Kar ité CI-FIRCA-295114-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th Consultant Qualif Pending Implem 2022-08-2 2022-10-1 2022-11-1 2022-12-1 2023-06-1 our une assistance fiscale d IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-08 ication Selection entation 9 2 1 6 4 e l’UC-PCCET pour l’installati rted Value Chains on de production de produit s pour le Karité CI-FIRCA-295115-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th Consultant Qualif Pending Implem 2022-09-0 2022-10-1 2022-11-1 2022-12-2 2023-06-2 our une assistance juridique IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-15 ication Selection entation 5 9 8 3 1 de l’UC-PCCET pour l’installa rted Value Chains tion pilote de production de produits pour le Karité CI-FIRCA-295090-CS-CQS / Recrutement d’un cabinet p Component 1: Improving th Consultant Qualif Pending Implem 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 our la réalisation des études IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 ication Selection entation 2 5 4 9 7 environnementales et social rted Value Chains es de l’installation de produ ction de produits pour le Kar ité CI-FIRCA-295113-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th Consultant Qualif Pending Implem 2022-08-2 2022-10-1 2022-11-1 2022-12-1 2023-06-1 our une assistance financièr IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-08 ication Selection entation 9 2 1 6 4 e de l’UC-PCCET pour l’instal rted Value Chains lation de production de prod uits pour le Karité CI-FIRCA-295091-CS-CQS / Recrutement d’un cabinet p Component 1: Improving th Consultant Qualif Under Implemen 2023-03-0 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 our la réalisation des études IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-01 ication Selection tation 3 2 5 4 9 7 techniques de l’installation rted Value Chains de production de produits p our le Karité Page 8 CI-FIRCA-310246-CS-CQS / Recrutement d’une firme (O Component 1: Improving th Consultant Qualif Under Implemen 2022-12-0 2022-09-2 2022-12-1 2022-11-0 2022-12-0 2023-01-0 2023-07-0 NG, Association…) pour une IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-09-01 ication Selection tation 8 2 5 5 5 9 8 assistance à la mise en œuv rted Value Chains re des services de garde d’e nfants CI-FIRCA-314351-CS-QCBS / RECRUTEMENT D’UNE FIRM E POUR IMPLEMENTER UN S YSTEME NUMÉRIQUE DE LA Component 1: Improving th Quality And Cost- Under Implemen 2022-09-0 2022-09-2 2022-09-0 2022-11-1 2022-12-0 2023-01-0 2023-02-1 2023-03-1 2024-03-1 FERTILITÉ DES SOLS DANS L IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-09-06 Based Selection tation 7 7 7 0 8 7 1 8 7 ES ZONES DE PRODUCTION rted Value Chains DES CHAINES DE VALEUR CI BLÉES PAR LE PCCET DONT L’HÉVÉA, LE PALMIER Á HUI LE, L’ANANAS, LA MANGUE ET LE KARITÉ CI-FIRCA-318570-CS-QCBS / Component 1: Improving th Recrutement d'une firme po Quality And Cost- Under Implemen 2022-10-1 2022-12-1 2022-10-1 2023-02-0 2023-03-0 2023-03-3 2023-05-0 2023-06-0 2024-06-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-11-28 ur l'assistance technique à l Based Selection tation 0 9 2 1 1 1 5 9 8 rted Value Chains a formation des femmes et l 'entrepreneuriat CI-FIRCA-326481-CS-CQS / Component 2: Improving ac Recrutement d’un cabinet p Consultant Qualif Under Implemen 2022-12-0 2022-12-1 2023-01-1 2023-02-1 2023-08-1 IDA / 69350 cess to finance for value ch Post Limited 0.00 2022-11-28 our l’assistance technique à ication Selection tation 6 2 1 5 4 ains la mise en place de la FILT CI-FIRCA-326482-CS-CQS / Component 2: Improving ac Recrutement d’un cabinet p Consultant Qualif Under Implemen 2022-11-2 2022-12-1 2023-01-1 2023-02-1 2023-08-1 IDA / 69350 cess to finance for value ch Post Limited 0.00 2022-11-28 our l’assistance fiscale à la ication Selection tation 5 2 1 5 4 ains mise en place de la FILT CI-FIRCA-326484-CS-CQS / Component 2: Improving ac Recrutement d’un cabinet p Consultant Qualif Under Implemen 2022-11-2 2022-12-1 2023-01-1 2023-02-1 2023-08-1 IDA / 69350 cess to finance for value ch Post Limited 0.00 2022-11-30 our l’assistance juridique à l ication Selection tation 5 4 3 7 6 ains a mise en place de la FILT CI-FIRCA-291664-CS-QCBS / Recrutement d’un Cabinet p Component 1: Improving th our le suivi et le contrôle de Quality And Cost- 2022-12-0 2022-06-2 2022-08-1 2022-09-0 2022-10-0 2022-11-1 2022-12-1 2023-12-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Under Review 2022-06-06 la construction du Centre Pil Based Selection 7 7 0 7 7 1 6 6 rted Value Chains ote de Production et d'Essai de Produits (CPPEP) et ses d eux (2) annexes CI-FIRCA-291660-CS-QCBS / Recrutement d'un Cabinet p Component 1: Improving th our réaliser les études de fai Quality And Cost- 2022-12-0 2022-07-2 2022-09-0 2022-10-0 2022-11-0 2022-12-0 2023-01-1 2024-01-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 Under Review 2022-07-04 sabilité du Centre Pilote de Based Selection 8 5 7 5 4 9 3 3 rted Value Chains Production et d'Essai de Pro duits (CPPEP) et ses deux (2 ) annexes CI-FIRCA-291662-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our la réalisation des études Consultant Qualif Pending Implem 2022-07-2 2022-09-0 2022-10-0 2022-11-1 2023-05-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-07-04 architecturales du Centre Pi ication Selection entation 5 7 7 1 0 rted Value Chains lote de Production et d'Essai de Produits (CPPEP) et ses d eux (2) annexes CI-FIRCA-295112-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our une assistance fiscale d Consultant Qualif Under Implemen 2022-12-0 2022-08-2 2022-12-1 2022-10-1 2022-11-1 2022-12-1 2023-06-1 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-08 e l’UC-PCCET pour le Centre ication Selection tation 7 9 4 2 1 6 4 rted Value Chains Pilote de Production et d'Ess ai de Produits (CPPEP) et se s deux (2) annexes CI-FIRCA-291661-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our la réalisation des études Consultant Qualif Pending Implem 2022-09-2 2022-11-0 2022-12-0 2023-01-1 2023-07-1 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-09-05 environnementales et social ication Selection entation 6 9 9 3 2 rted Value Chains es du Centre Pilote de Produ ction et d'Essai de Produits ( CPPEP) et ses deux (2) anne xes CI-FIRCA-291665-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our une assistance juridique Consultant Qualif Under Implemen 2022-12-0 2022-06-2 2022-12-1 2022-08-0 2022-09-0 2022-10-0 2023-04-0 IDA / 69360 e Competitiveness of Suppo Post Open - National 0.00 2022-06-01 de l’UC-PCCET pour le Centr ication Selection tation 7 2 4 5 4 9 7 rted Value Chains e Pilote de Production et d'E ssai de Produits (CPPEP) et s es deux (2) annexes CI-FIRCA-295111-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th our une assistance financièr Consultant Qualif Under Implemen 2022-12-0 2022-08-2 2022-12-1 2022-10-1 2022-11-1 2022-12-1 2023-06-1 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 2022-08-08 e de l’UC-PCCET pour Centr ication Selection tation 7 9 4 2 1 6 4 rted Value Chains e le Pilote de Production et d'Essai de Produits (CPPEP) et ses deux (2) annexes CI-FIRCA-330986-CS-QCBS / RECRUTEMENT D’UNE FIRM E POUR L’ASSISTANCE TECH Component 1: Improving th Quality And Cost- Open - Internation Under Implemen 2022-12-1 2023-01-0 2022-12-2 2023-02-1 2023-03-1 2023-04-1 2023-05-2 2023-06-2 2024-06-2 NIQUE ET LE SUIVI DES TRA IDA / 69350 e Competitiveness of Suppo Post 0.00 2022-12-16 Based Selection al tation 4 6 2 9 9 8 3 7 6 VAUX POUR UN CENTRE PIL rted Value Chains OTE DE PRODUCTION ET D'E SSAI DE PRODUITS (CPPEP) ET SES DEUX (2) ANNEXES CI-FIRCA-295094-CS-CQS / Recrutement d’un cabinet p Component 1: Improving th Consultant Qualif 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 our la réalisation des études IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-01 ication Selection 2 5 4 9 7 environnementales et social rted Value Chains es pour la création d’une un ité de fabrication d’emballa ge CI-FIRCA-295117-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th Consultant Qualif 2022-09-0 2022-10-1 2022-11-1 2022-12-2 2023-06-2 our une assistance fiscale d IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-15 ication Selection 5 9 8 3 1 e l’UC-PCCET pour la créatio rted Value Chains n d’une unité de fabrication d’emballage CI-FIRCA-295096-CS-CQS / Recrutement d’un cabinet p Component 1: Improving th Consultant Qualif 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 our la réalisation des études IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-01 ication Selection 2 5 4 9 7 techniques pour la création rted Value Chains d’une unité de fabrication d’ emballage CI-FIRCA-295116-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th Consultant Qualif 2022-09-0 2022-10-1 2022-11-1 2022-12-2 2023-06-2 our une assistance financièr IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-15 ication Selection 5 9 8 3 1 e de l’UC-PCCET pour la cré rted Value Chains ation d’une unité de fabricat ion d’emballage CI-FIRCA-295118-CS-CQS / Recrutement d’un Cabinet p Component 1: Improving th Consultant Qualif 2022-09-0 2022-10-1 2022-11-1 2022-12-2 2023-06-2 our une assistance juridique IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-15 ication Selection 5 9 8 3 1 de l’UC-PCCET pour la créati rted Value Chains on d’une unité de fabricatio n d’emballage CI-FIRCA-295097-CS-QCBS / Component 1: Improving th Recrutement d’un Cabinet p Quality And Cost- 2022-10-0 2022-11-1 2022-12-1 2023-01-1 2023-02-1 2023-03-2 2024-03-2 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-09-12 our le Suivi et le contrôle de Based Selection 3 6 4 3 7 4 3 rted Value Chains la création d’une unité de fa brication d’emballage CI-FIRCA-295101-CS-CQS / Recrutement d’un cabinet p Component 1: Improving th our la réalisation des études Consultant Qualif 2022-08-2 2022-10-0 2022-11-0 2022-12-0 2023-06-0 IDA / 69350 e Competitiveness of Suppo Post Open - National 0.00 Canceled 2022-08-01 techniques de chambres froi ication Selection 2 5 4 9 7 rted Value Chains des de conservation des pro duits agricoles dont les fruit s (ex. mangue et ananas) et le Karité CI-FIRCA-332958-CS-QCBS / RECRUTEMENT D’UN CABIN Component 1: Improving th ET POUR FOURNIR L’ASSIST Quality And Cost- Open - Internation Under Implemen 2023-01-1 2023-01-1 2023-01-2 2023-03-0 2023-03-2 2023-04-2 2023-06-0 2023-07-0 2024-07-0 IDA / 69360 e Competitiveness of Suppo Post 0.00 2023-01-06 ANCE TECHNIQUE SUR LA C Based Selection al tation 7 6 7 1 9 8 2 7 6 rted Value Chains HAINE DU FROID POUR LES PRODUITS FRAIS ET AUTRES EN CÔTE D’IVOIRE CI-FIRCA-336828-CS-QCBS / Recrutement d’un cabinet p Component 1: Improving th Quality And Cost- Open - Internation Under Implemen 2023-01-1 2023-02-2 2023-01-2 2023-04-0 2023-05-0 2023-06-0 2023-07-0 2023-08-1 2024-08-1 our réaliser les études techn IDA / 69350 e Competitiveness of Suppo Post 0.00 2023-01-30 Based Selection al tation 8 0 7 5 3 2 7 1 0 iques et financières d’une u rted Value Chains sine moderne de transforma tion de fruits (dont la mang ue) CI-FIRCA-349961-CS-QCBS / Recrutement d’un cabinet p Component 1: Improving th Quality And Cost- Open - Internation Under Implemen 2023-03-2 2023-04-1 2023-03-3 2023-05-3 2023-06-2 2023-07-2 2023-09-0 2023-10-0 2024-10-0 our la réalisation des études IDA / 69350 e Competitiveness of Suppo Post 0.00 2023-03-27 Based Selection al tation 4 7 0 1 8 8 1 6 5 techniques de l’installation rted Value Chains de production de produits p our le Karité CI-FIRCA-355894-CS-CQS / Component 2: Improving ac Recrutement d'un cabinet c Consultant Qualif Open - Internation Under Implemen 2023-04-2 2023-05-2 2023-04-2 2023-07-0 2023-08-0 2023-09-0 2024-03-0 IDA / 69350 cess to finance for value ch Post 0.00 2023-05-01 hargé du commissariat aux ication Selection al tation 0 2 4 5 4 8 6 ains comptes de la CDC CI Capit al CI-FIRCA-355899-CS-CQS / Component 2: Improving ac Recrutement d un cabinet s Consultant Qualif Open - Internation Under Implemen 2023-04-2 2023-05-2 2023-04-2 2023-07-1 2023-08-1 2023-09-1 2024-03-1 IDA / 69350 cess to finance for value ch Post 0.00 2023-05-08 uppléant du commissariat a ication Selection al tation 0 9 4 2 1 5 3 ains ux comptes de la CDC-CI ca pital CI-FIRCA-366313-CS-CQS / Recrutement d’un cabinet p our le développement et la Component 2: Improving ac Quality Based Sel Open - Internation Pending Implem 2023-07-1 2023-08-3 2023-09-2 2023-10-2 2023-11-2 2023-12-3 2024-12-3 mise en œuvre d’un Systèm IDA / 69350 cess to finance for value ch Post 0.00 2023-06-26 ection al entation 7 0 7 7 6 1 0 e d’Information et de Gestio ains n (SIG) mutualisé pour les In stitutions de Microfinance (I MF) engagées (11 IMF) CI-FIRCA-366327-CS-CQS / Sélection d’un cabinet pour Component 3: Policy Refor la rédaction des projets de t Consultant Qualif Under Implemen 2023-06-1 2023-07-1 2023-08-3 2023-09-3 2023-11-0 2024-05-0 IDA / 69350 ms and Institutional Reinfor Post Open - National 0.00 2023-06-27 extes législatifs et règlemen ication Selection tation 3 8 1 0 4 2 cement taires relatifs à la rationalisa tion des licences et permis d'affaires CI-FIRCA-366330-CS-CQS / Component 3: Policy Refor Sélection d'un cabinet pour l Consultant Qualif Under Implemen 2023-07-2 2023-09-0 2023-10-0 2023-11-1 2024-05-0 IDA / 69350 ms and Institutional Reinfor Post Open - National 0.00 2023-07-03 a réalisation de l'étude de r ication Selection tation 4 6 6 0 8 cement ationalisation des licences e t permis d'affaires CI-FIRCA-366332-CS-CQS / Sélection d’un prestataire p Component 3: Policy Refor Consultant Qualif Under Implemen 2023-06-1 2023-07-2 2023-09-0 2023-10-0 2023-11-0 2024-05-0 our la numérisation des arc IDA / 69350 ms and Institutional Reinfor Post Open - National 0.00 2023-06-29 ication Selection tation 3 0 2 2 6 4 hives du Guichet Unique et cement des greffes de l’intérieur du pays. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit Market Approa Actual Amount Process Statu Invitation to Identifie Draft Negotiated Con Component Review Type Method Contract Type Teams of Reference Signed Contract Contract Completion Description No. ch (US$) s d/Selected Consultan tract t Page 9 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIRCA-189681-CS-CQS / Component 3: Policy Refor Individual Consul Under Implemen 2020-09-2 2020-10-1 2020-11-0 2020-12-1 2021-06-1 Recrutement de 4 consultan / ms and Institutional Reinfor Post Limited 0.00 2020-10-13 tant Selection tation 3 8 8 3 1 ts individuel, spécialistes de cement Cluster CI-FIRCA-189707-CS-INDV / Recrutement d'un consultan Component 3: Policy Refor Individual Consul Under Implemen 2020-09-1 2020-10-1 2020-09-2 2020-11-0 2020-12-1 2021-06-1 t pour la réalisation du CGE / ms and Institutional Reinfor Post Limited 0.00 2020-10-12 tant Selection tation 5 7 5 7 2 0 S (ESMF) qui intègrera un pl cement an de gestion des pestes (P GP) CI-FIRCA-189782-CS-INDV / Sélection d'un consultant in Component 4: Project Coor Individual Consul Under Implemen 2020-09-2 2020-10-1 2020-09-2 2020-11-0 2020-10-2 2020-12-1 2021-06-1 / Post Limited 0.00 2020-10-14 dividuel pour l'élaboration d dination and Management tant Selection tation 3 9 5 9 0 4 2 u cadre politique de réinstall ation (CPR) CI-FIRCA-189785-CS-INDV / Sélection d'un consultant in Component 4: Project Coor Individual Consul Under Implemen 2020-09-2 2020-09-2 2020-09-3 2020-10-1 2020-10-2 2020-11-1 2021-05-1 / Post Limited 0.00 2020-09-18 dividuel pour la préparation dination and Management tant Selection tation 5 3 0 4 0 8 7 du plan de gestion de la mai n d'oeuvre CI-FIRCA-189826-CS-INDV / Recrutement d'un responsa Component 4: Project Coor Individual Consul 2021-02-2 2021-03-1 2021-04-2 2021-10-1 / Post Open 0.00 Canceled 2021-01-05 ble administratif financier et dination and Management tant Selection 3 6 0 7 comptable de l'UCP du PPET CI-FIRCA-189840-CS-INDV / Component 4: Project Coor Individual Consul 2021-02-2 2021-03-1 2021-04-2 2021-10-1 Recrutement d'un spécialist / Post Open 0.00 Canceled 2021-01-07 dination and Management tant Selection 5 8 2 9 e en passation des marchés de l'UCP du PPET CI-FIRCA-189844-CS-INDV / Component 4: Project Coor Individual Consul 2021-01-1 2021-02-0 2021-03-1 2021-09-0 Recrutement d'un Expert Su / Post Limited 0.00 Canceled 2021-01-11 dination and Management tant Selection 6 6 3 9 ivi Evaluation de l'UCP du PP ET CI-FIRCA-189846-CS-INDV / Component 4: Project Coor Individual Consul Under Implemen 2020-11-0 2020-12-1 2020-11-2 2021-01-0 2021-02-0 2021-08-0 Recrutement d'une assistan / Post Limited 0.00 2020-12-07 dination and Management tant Selection tation 9 2 4 2 6 5 te de l'UCP du PPET CI-FIRCA-189850-CS-INDV / Recrutement d'un spécialist Component 4: Project Coor Individual Consul 2021-03-0 2021-03-2 2021-04-3 2021-10-2 / Post Open 0.00 Canceled 2021-01-15 e en mesures de sauvegard dination and Management tant Selection 5 6 0 7 e environnementale CI-FIRCA-189856-CS-INDV / Component 4: Project Coor Individual Consul 2021-03-2 2021-04-1 2021-05-1 2021-11-1 / Post Open 0.00 Canceled 2021-02-03 Recrutement d'un auditeur i dination and Management tant Selection 4 4 9 5 nterne CI-FIRCA-191974-CS-CDS / Component 4: Project Coor Pending Implem 2020-09-2 2020-12-0 2021-05-3 Services fiduciaires du FIRC / Post Direct Selection Direct 0.00 2020-09-18 dination and Management entation 8 2 1 A pour la gestion fiduciaire du PPET CI-FIRCA-189791-CS-INDV / Component 4: Project Coor Individual Consul 2020-10-2 2020-11-1 2020-12-2 2021-06-1 Recrutement d'un consultan / Post Limited 0.00 Canceled 2020-10-20 dination and Management tant Selection 5 5 0 8 t individuel pour réaliser le P PSD CI-FIRCA-191932-CS-INDV / Component 2: Improving ac Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 IDA / V3490 Post Limited 0.00 Canceled 2020-12-17 Recrutement d'un expert jur cess to finance for value ch tant Selection 2 2 6 5 idique du FSI ains CI-FIRCA-191915-CS-INDV / Component 2: Improving ac Individual Consul 2021-03-1 2021-04-0 2021-05-0 2021-11-0 Recrutement d'un consultan IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2021-03-09 tant Selection 4 4 9 5 t individuel pour assister le ains gérant de la SIPROFI CI-FIRCA-191913-CS-INDV / Component 2: Improving ac Recrutement d'un consultan Individual Consul 2021-03-1 2021-04-0 2021-05-0 2021-11-0 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2021-03-08 t individuel en charge de la tant Selection 3 3 8 4 ains gestion de la SIPROFI CI-FIRCA-191916-CS-INDV / Recrutement d'un consultan t spécialiste de l’évaluation Component 4: Project Coor Individual Consul 2020-10-0 2020-10-2 2020-12-0 2021-05-3 / Post Limited 0.00 Canceled 2020-10-01 des besoins financiers en fo dination and Management tant Selection 6 7 1 0 nds propres et en dette des entreprises en période de re prise post-crise CI-FIRCA-191918-CS-INDV / Recrutement d'un consultan t spécialiste de l’évaluation Component 4: Project Coor Individual Consul 2020-10-0 2020-10-2 2020-12-0 2021-05-3 des besoins financiers en fo / Post Limited 0.00 Canceled 2020-10-02 dination and Management tant Selection 7 8 2 1 nds propres et en dette des entreprises et des sociétés ad-hoc de PPP dans le cadre de la croissance verte CI-FIRCA-189796-CS-INDV / Recrutement d'un consultan Component 4: Project Coor Individual Consul Under Implemen 2021-08-1 2020-12-1 2021-01-0 2021-02-1 2021-08-1 IDA / V3490 Post Limited 0.00 2020-12-14 t individuel pour élaborer le dination and Management tant Selection tation 7 9 9 3 2 manuel de procédures et d' exécution du projet CI-FIRCA-191927-CS-INDV / Component 2: Improving ac Recrutement d'experts spéc Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2020-12-18 ialistes sectoriels dans le ca tant Selection 3 3 7 6 ains dre de la mise en place du F SI CI-FIRCA-189853-CS-INDV / Component 3: Policy Refor Individual Consul 2021-02-2 2021-03-1 2021-04-2 2021-10-1 IDA / V3490 Post Open 0.00 Canceled 2021-01-05 Recrutement d'un spécialist ms and Institutional Reinfor tant Selection 3 6 0 7 e en genre cement CI-FIRCA-191929-CS-INDV / Component 2: Improving ac Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 Recrutement d'un analyste f IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2020-12-17 tant Selection 2 2 6 5 inancier pour le FOF et le FS ains I CI-FIRCA-191931-CS-INDV / Component 2: Improving ac Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 IDA / V3490 Post Limited 0.00 Canceled 2020-12-17 Recrutement du directeur d cess to finance for value ch tant Selection 2 2 6 5 u FSI ains CI-FIRCA-191933-CS-INDV / Component 2: Improving ac Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 Recrutement d'un chargé se IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2020-12-17 tant Selection 2 2 6 5 nior en investissement du F ains SI CI-FIRCA-191935-CS-INDV / Component 3: Policy Refor Recrutement d'un consultan Individual Consul 2020-12-0 2020-12-3 2021-02-0 2021-08-0 IDA / V3490 ms and Institutional Reinfor Post Limited 0.00 Canceled 2020-12-04 t pour faire une étude sur le tant Selection 9 0 3 2 cement s Partenariats Publics-Privé ( PPP) CI-FIRCA-191936-CS-INDV / Component 3: Policy Refor Recrutement d'un consultan Individual Consul 2020-12-1 2021-01-0 2021-02-0 2021-08-0 IDA / V3490 ms and Institutional Reinfor Post Limited 0.00 Canceled 2020-12-07 t pour examiner l'état actuel tant Selection 2 2 6 5 cement de la livraison des conteneu rs CI-FIRCA-191938-CS-INDV / Recrutement d'un consultan Component 3: Policy Refor Individual Consul 2020-12-1 2021-01-0 2021-02-0 2021-08-0 t pour faire une étude sur la IDA / V3490 ms and Institutional Reinfor Post Limited 0.00 Canceled 2020-12-08 tant Selection 3 3 7 6 mise en œuvre du cadre lég cement al des sociétés coopératives CI-FIRCA-191925-CS-INDV / Component 2: Improving ac Recrutement d'un expert en Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2020-12-17 analyse économique des pr tant Selection 2 2 6 5 ains ojets dans le cadre de la mis e en place du FSI CI-FIRCA-191900-CS-INDV / Component 2: Improving ac Recrutement d'un consultan Individual Consul 2021-03-0 2021-03-2 2021-05-0 2021-10-2 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2021-03-01 t individuel en charge d'assi tant Selection 6 7 1 8 ains ster le directeur du FOF (ex ecutive assistante) CI-FIRCA-191903-CS-INDV / Component 2: Improving ac Recrutement d'un consultan Individual Consul 2021-03-0 2021-03-2 2021-05-0 2021-10-2 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2021-03-02 t individuel en charge de la tant Selection 7 8 2 9 ains direction du fondS de fonds CI-FIRCA-189641-CS-INDV / Recrutement d'un consultan t l'exercice de bilan sur les s ervices à valeur ajoutée qui Component 4: Project Coor Individual Consul 2020-10-0 2020-10-2 2020-11-2 2021-05-2 sont / peuvent être associés / Post Limited 0.00 Canceled 2020-09-28 dination and Management tant Selection 3 4 8 7 aux plateformes (examen d emandes de prêt, mécanism es d'amélioration du crédit, notation PME, formation des entreprises, cours de fin d'é tude CI-FIRCA-189550-CS-INDV / Recrutement d'un consultan t pour accélérer les réforme Component 3: Policy Refor Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 s dans le secteur des institu IDA / V3490 ms and Institutional Reinfor Post Limited 0.00 Canceled 2020-12-15 tant Selection 0 0 4 3 tions de microfinance (sur la cement base des actions identifiées dans la stratégie d'inclusion financière) CI-FIRCA-191905-CS-INDV / Component 2: Improving ac Recrutement d'un consultan Individual Consul 2021-03-0 2021-03-2 2021-05-0 2021-10-3 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2021-03-03 t individuel expert juridique tant Selection 8 9 3 0 ains pour la mise en place du FO F CI-FIRCA-189810-CS-INDV / Recrutement d'un expert du secteur financier pour la PIU Component 4: Project Coor Individual Consul 2021-02-0 2021-02-2 2021-04-0 2021-09-3 IDA / V3490 Post Limited 0.00 Canceled 2021-02-01 , le renforcement des capaci dination and Management tant Selection 6 7 3 0 tés et assurer une bonne mi se en oeuvre des activités d e la composante 2 CI-FIRCA-204369-CS-INDV / Component 1: Improving th Individual Consul 2021-01-2 2021-02-1 2021-03-1 2021-09-1 Recrutement de 16 consulta IDA / V3490 e Competitiveness of Suppo Post Limited 0.00 Canceled 2021-01-15 tant Selection 0 0 7 3 nts individuel, spécialistes d rted Value Chains e Cluster CI-FIRCA-205699-CS-INDV / Component 4: Project Coor Individual Consul 2021-02-2 2021-03-1 2021-04-2 2021-10-1 Recrutement d'un spécialist IDA / V3490 Post Open 0.00 Canceled 2021-01-06 dination and Management tant Selection 4 7 1 8 e en suivi-évaluation CI-FIRCA-189553-CS-INDV / Recrutement d'un consultan t (analyste financier) pour la Component 4: Project Coor Individual Consul 2021-01-1 2021-02-0 2021-03-1 2021-09-0 IDA / V3490 Post Limited 0.00 Canceled 2021-01-11 réalisation des simulations fi dination and Management tant Selection 6 6 3 9 nancières pro forma dans le cadre de la mise en place d u FOF CI-FIRCA-202205-CS-CDS / Component 4: Project Coor Individual Consul 2020-12-1 2020-12-2 2021-01-1 2021-02-1 2021-08-1 Sélection d'un consultant in IDA / V3490 Post Limited 0.00 Canceled 2020-12-17 dination and Management tant Selection 8 2 2 6 5 dividuel pour l'élaboration d u PPSD CI-FIRCA-244467-CS-INDV / Component 2: Improving ac Recrutement d’un consultan Individual Consul Under Implemen 2021-07-2 2021-08-0 2021-08-3 2021-10-0 2022-04-0 IDA / V3490 cess to finance for value ch Post Limited 0.00 2021-08-04 t individuel du PCCET dans l tant Selection tation 6 9 0 4 2 ains e cadre de la mise en œuvr e de la LTIF Page 10 CI-FIRCA-244470-CS-INDV / Component 2: Improving ac Recrutement d’un Consulta Individual Consul 2021-08-1 2021-08-1 2021-09-0 2021-10-1 2022-04-0 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2021-08-10 nt Individuel pour la créatio tant Selection 8 5 5 0 8 ains n et la maintenance du site i nternet du PCCET CI-FIRCA-244472-CS-INDV / Recrutement d’un Consulta nt Individuel pour émettre u Component 2: Improving ac ne Opinion Juridique confirm Individual Consul Under Implemen 2021-07-2 2021-08-3 2021-08-1 2021-09-2 2021-09-0 2021-10-2 2022-04-2 IDA / V3490 cess to finance for value ch Post Limited 0.00 2021-08-25 ant que l’Accord de Projet (e tant Selection tation 6 0 1 0 6 5 3 ains ntre la CDC-CI et la BM) a ét é dûment autorisé et exécut é, et est juridiquement contr aignant conformément à se s propres termes CI-FIRCA-244473-CS-INDV / Recrutement d’un Consulta nt Individuel pour émettre u Component 2: Improving ac ne Opinion Juridique confirm Individual Consul Under Implemen 2021-07-2 2021-07-2 2021-08-1 2021-08-1 2021-09-0 2021-09-2 2022-03-2 IDA / V3490 cess to finance for value ch Post Limited 0.00 2021-07-22 ant que l’Accord subsidiaire tant Selection tation 8 7 1 7 6 1 0 ains (entre la CDC-CI et le MEF) a été dûment autorisé et exéc uté, et est juridiquement co ntraignant conformément à ses propres termes CI-FIRCA-244474-CS-INDV / Recrutement d'un consultan Component 4: Project Coor Individual Consul 2021-07-2 2021-09-0 2021-09-2 2021-10-3 2022-04-2 t individuel du PCCET pour r IDA / V3490 Post Limited 0.00 Under Review 2021-08-31 dination and Management tant Selection 8 5 6 1 9 enforcer l’UCP dans ses opé rations dans les chaines de valeur sélectionnées CI-FIRCA-244475-CS-INDV / Recrutement d’un Consulta Component 2: Improving ac Individual Consul Under Implemen 2021-07-2 2021-09-0 2022-01-0 2021-09-2 2022-09-2 2021-10-2 2022-04-2 nt pour la rédaction du man IDA / V3490 cess to finance for value ch Post Limited 0.00 2021-08-27 tant Selection tation 8 1 6 2 8 7 5 uel de Gestion Environneme ains ntal et Social (SGES) de la C DC-CI CI-FIRCA-244477-CS-INDV / Component 2: Improving ac Recrutement d'un Spécialist Individual Consul 2021-07-2 2021-10-1 2021-11-0 2021-12-0 2022-06-0 IDA / V3490 cess to finance for value ch Post Open 0.00 Under Review 2021-08-24 e en Sauvegarde Environne tant Selection 6 2 2 7 5 ains mentale pour la CDC-CI CI-FIRCA-244484-CS-INDV / Sélection d'un consultant in dividuel pour la définition de Component 4: Project Coor Individual Consul Under Implemen 2021-07-0 2021-08-0 2021-08-2 2021-09-2 2022-03-2 s spécifications techniques, IDA / V3490 Post Limited 0.00 2021-07-30 dination and Management tant Selection tation 1 4 5 9 8 des cahiers de charges des t ravaux de mise en conformi té du siège du PCCET et du suivi contrôle de l’exécution des travaux CI-FIRCA-191934-CS-INDV / Recrutement d'un consultan Component 3: Policy Refor Individual Consul 2021-01-1 2021-02-0 2021-03-1 2021-09-1 t pour faire une étude sur la IDA / V3490 ms and Institutional Reinfor Post Limited 0.00 Canceled 2021-01-12 tant Selection 7 7 4 0 gouvernance et la gestion d cement es zones industrielles en Côt e d'Ivoire CI-FIRCA-189787-CS-INDV / Sélection d'un consultant po Component 4: Project Coor Individual Consul 2020-12-1 2021-01-0 2021-02-1 2021-08-0 IDA / V3490 Post Limited 0.00 Canceled 2020-12-11 ur la préparation de l'étude dination and Management tant Selection 6 6 0 9 d'impact environnemental e t social CI-FIRCA-237654-CS-INDV / Component 4: Project Coor Individual Consul 2021-11-0 2021-11-2 2021-12-2 2022-06-2 IDA / V3490 Post Open 0.00 Canceled 2021-09-15 Recrutement d'un spécialist dination and Management tant Selection 3 4 9 7 e en genre CI-FIRCA-237659-NC-RFQ / Component 4: Project Coor Individual Consul 2021-07-0 2021-07-2 2021-09-0 2022-02-2 Sélection d'un infographe p IDA / V3490 Post Limited 0.00 Canceled 2021-07-02 dination and Management tant Selection 7 8 1 8 our la conception du logo d u PCCET CI-FIRCA-237652-CS-INDV / Component 4: Project Coor Individual Consul 2021-11-0 2021-11-2 2021-12-2 2022-06-2 Recrutement d'un spécialist IDA / V3490 Post Open 0.00 Canceled 2021-09-15 dination and Management tant Selection 3 4 9 7 e en suivi- évaluation CI-FIRCA-191909-CS-INDV / Component 2: Improving ac Recrutement d'un consultan Individual Consul 2021-03-1 2021-04-0 2021-05-0 2021-11-0 IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2021-03-08 t individuel senior chargé d'i tant Selection 3 3 8 4 ains nvestissement pour la mise en place du FOF CI-FIRCA-189558-CS-INDV / Recrutement d'un consultan t pour le benchmark des mo Component 4: Project Coor Individual Consul 2020-12-2 2021-01-1 2021-02-2 2021-08-1 dèles d'affaires des différent IDA / V3490 Post Limited 0.00 Canceled 2020-12-21 dination and Management tant Selection 6 6 0 9 es plateformes dans le mon de dans le cadre de la platef orme de marché numérique pour les prêts aux PME CI-FIRCA-189515-CS-INDV / Recrutement d'un consultan Component 4: Project Coor Individual Consul 2020-12-0 2020-12-2 2021-01-3 2021-07-3 t en charge de la mise à jou IDA / V3490 Post Limited 0.00 Canceled 2020-12-01 dination and Management tant Selection 6 7 1 0 r du cadre règlementaire de s institutions de microfinanc e (approche par les risques) CI-FIRCA-237657-CS-INDV / Component 4: Project Coor Individual Consul 2021-11-0 2021-11-2 2021-12-2 2022-06-2 Recrutement d'un (e) spéci IDA / V3490 Post Open 0.00 Canceled 2021-09-15 dination and Management tant Selection 3 4 9 7 aliste chargé (e) de commu nication CI-FIRCA-237653-CS-INDV / Component 4: Project Coor Individual Consul 2021-11-0 2021-11-2 2021-12-2 2022-06-2 Recrutement d'un Spécialist IDA / V3490 Post Open 0.00 Canceled 2021-09-15 dination and Management tant Selection 3 4 9 7 e en Sauvegarde Environne mental et Social CI-FIRCA-189843-CS-INDV / Component 4: Project Coor Individual Consul 2021-02-2 2021-03-1 2021-04-2 2021-10-2 Recrutement d'un comptabl / Post Open 0.00 Canceled 2021-01-08 dination and Management tant Selection 6 9 3 0 e de l'UCP du PPET CI-FIRCA-189806-CS-INDV / Recrutement d'un consultan Component 4: Project Coor Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 IDA / V3490 Post Limited 0.00 Canceled 2020-12-15 t individuel pour l'élaboratio dination and Management tant Selection 0 0 4 3 n du manuel de suivi évalua tion du projet CI-FIRCA-189552-CS-INDV / Recrutement d'un conseiller Component 2: Improving ac Individual Consul 2020-12-2 2021-01-1 2021-02-1 2021-08-1 juridique pour revoir les doc IDA / V3490 cess to finance for value ch Post Limited 0.00 Canceled 2020-12-17 tant Selection 2 2 6 5 uments légaux (statuts etc.. ains ) dans le cadre de la mise e n place du FSI CI-FIRCA-250595-CS-INDV / Sélection d'un Consultant In dividuel pour l'élaboration d Component 4: Project Coor Individual Consul Under Implemen 2021-08-3 2021-09-0 2021-09-2 2021-10-3 2022-04-2 IDA / V3490 Post Limited 0.00 2021-08-31 u manuel de procédures de dination and Management tant Selection tation 1 5 6 1 9 gestion administrative, fina ncière, comptable et de pas sation des marchés du PCCE T CI-FIRCA-250596-CS-INDV / Recrutement d'un responsa Component 4: Project Coor Individual Consul 2021-09-1 2021-11-1 2021-12-0 2022-01-1 2022-07-1 IDA / V3490 Post Open 0.00 Canceled 2021-09-30 ble communication et appui dination and Management tant Selection 4 8 9 3 2 à la coordination du PCCET CI-FIRCA-253846-CS-INDV / Recrutement d'un consultan Component 1: Improving th t individuel pour entreprend Individual Consul 2022-02-1 2021-10-0 2021-10-2 2021-11-2 2022-05-2 IDA / V3490 e Competitiveness of Suppo Post Limited 0.00 Canceled 2021-09-27 re une étude d'évaluation d tant Selection 6 2 3 7 6 rted Value Chains u paysage informatique ivoi rien, y compris les capacités de la technologie Blockchain CI-FIRCA-255051-CS-CDS / Sélection par entente direct e de M.ALEGBA DJIDJOLE YA Component 4: Project Coor 2021-10-1 2021-12-1 2022-06-1 IDA / V3490 Post Direct Selection Direct 0.00 Canceled 2021-09-30 OVI, pour le suivi des trava dination and Management 0 4 2 ux complémentaires et insta llation des équipements du PCCET CI-FIRCA-256939-CS-INDV / Component 1: Improving th Recrutement de 12 consulta Individual Consul Under Implemen 2021-11-2 2021-11-1 2021-12-0 2022-01-1 2022-07-0 IDA / 69360 e Competitiveness of Suppo Post Limited 0.00 2021-11-10 nts de compétitivités des ch tant Selection tation 9 5 6 0 9 rted Value Chains aines de valeur sur 5 ans CI-FIRCA-257208-CS-INDV / Component 4: Project Coor Individual Consul Pending Implem 2022-02-0 2022-02-2 2022-03-2 2022-09-2 Recrutement d’un(e) chargé IDA / 69360 Post Open 0.00 2021-12-14 dination and Management tant Selection entation 1 2 9 5 (e) de communication CI-FIRCA-257216-CS-INDV / Component 4: Project Coor Individual Consul Under Implemen 2022-01-1 2022-01-3 2022-02-2 2022-03-2 2022-09-2 Recrutement d’un(e) Spécia IDA / 69360 Post Open 0.00 2021-12-13 dination and Management tant Selection tation 9 1 1 8 4 liste en suivi évaluation CI-FIRCA-257470-CS-INDV / Recrutement d'un consultan Component 4: Project Coor Individual Consul 2021-12-1 2021-11-1 2021-12-0 2022-01-1 2022-07-0 IDA / 69360 Post Limited 0.00 Canceled 2021-11-10 t individuel pour l'élaboratio dination and Management tant Selection 3 5 6 0 9 n du manuel de mécanisme des plaintes du PCCET. CI-FIRCA-257472-CS-INDV / Component 4: Project Coor Individual Consul Under Implemen 2021-10-2 2021-10-1 2021-11-0 2021-12-1 2022-06-0 Responsable appui à la coor IDA / 69360 Post Limited 0.00 2021-10-11 dination and Management tant Selection tation 8 6 6 1 9 dination du PCCET CI-FIRCA-257228-CS-CDS / Component 4: Project Coor Pending Implem 2022-01-0 2022-03-1 2022-09-1 Convention avec le FIRCA p IDA / 69360 Post Direct Selection Direct 0.00 2021-12-29 dination and Management entation 8 4 0 our la gestion fiduciaire du p rojet CI-FIRCA-244468-CS-CDS / Recrutement d’un Cabinet d Component 2: Improving ac 2021-07-2 2021-08-1 2021-10-2 2022-04-1 ’audit international (MAZAR IDA / V3490 cess to finance for value ch Post Direct Selection Direct 0.00 Canceled 2021-08-06 6 6 0 8 S MAROC) pour la rédaction ains du manuel des opérations d e la LTIF CI-FIRCA-244471-CS-CDS / Recrutement d’un Cabinet d Component 2: Improving ac e conseil international (MAZ 2021-07-2 2021-09-0 2021-11-1 2022-05-0 IDA / V3490 cess to finance for value ch Post Direct Selection Direct 0.00 Canceled 2021-08-27 ARS Maroc) pour des opérati 6 6 0 9 ains ons de bechmarks et de ren forcement technique de la C DC/LTIF CI-FIRCA-257232-CS-INDV / Recrutement d'un consultan Component 1: Improving th Individual Consul 2023-08-2 2023-09-1 2023-10-2 2024-04-2 t individuel pour préparer d IDA / 69360 e Competitiveness of Suppo Post Open 0.00 Canceled 2023-07-11 tant Selection 9 9 4 1 es spécifications techniques rted Value Chains pour des chaines de valeur appuyés (n°1) CI-FIRCA-257242-CS-INDV / Recrutement d'un(e) Spécial Component 2: Improving ac Individual Consul 2022-01-3 2022-02-2 2022-03-2 2022-09-2 iste en sauvegarde pour la IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2021-12-13 tant Selection 1 1 8 4 mise en place du Système d ains e Monitoring Social et Enviro nnemental Page 11 CI-FIRCA-250597-NC-RFQ / Sélection d'un consultant in dividuel pour effectuer les d Component 4: Project Coor Individual Consul 2021-09-3 2021-10-2 2021-11-2 2022-05-2 IDA / V3490 Post Limited 0.00 Canceled 2021-09-25 émarches administratives li dination and Management tant Selection 0 1 5 4 ées à la création de la sociét é CDC-CI INVEST dans le ca dre de la FILT. CI-FIRCA-257236-CS-INDV / Recrutement d'un consultan Component 1: Improving th Individual Consul 2022-11-1 2022-12-0 2023-01-1 2023-07-0 t individuel pour préparer d IDA / 69360 e Competitiveness of Suppo Post Open 0.00 Canceled 2022-09-27 tant Selection 5 6 0 9 es spécifications techniques rted Value Chains pour des chaines de valeur appuyés (n°2) CI-FIRCA-256917-CS-INDV / Component 2: Improving ac Individual Consul 2022-03-1 2022-04-0 2022-05-1 2022-11-0 Consultant individuel intern IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2022-01-25 tant Selection 5 5 0 6 ational pour la formation de ains s IMFs connectées CI-FIRCA-256901-CS-INDV / Component 2: Improving ac Sélection d’un consultant in Individual Consul 2022-04-2 2022-05-1 2022-06-2 2022-12-1 IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2022-03-09 dividuel pour le renforceme tant Selection 7 8 2 9 ains nt des capacités des IMFs n on éligibles CI-FIRCA-257220-CS-INDV / Component 4: Project Coor Individual Consul 2022-01-1 2022-02-0 2022-03-1 2022-09-1 Recrutement d’un(e) Spécia IDA / 69360 Post Open 0.00 Canceled 2021-11-29 dination and Management tant Selection 7 7 4 0 liste en genre CI-FIRCA-258147-CS-INDV / Component 2: Improving ac Individual Consul 2021-12-2 2022-01-1 2022-02-2 2022-08-2 Recrutement d'un Responsa IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2021-11-08 tant Selection 7 7 1 0 ble Principal des Investisse ains ments CI-FIRCA-257240-CS-INDV / Component 2: Improving ac Individual Consul 2022-07-0 2022-07-2 2022-09-0 2023-02-2 Recrutement d'un Comptabl IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2022-05-19 tant Selection 7 8 1 8 e Senior local ains CI-FIRCA-258150-CS-INDV / Component 2: Improving ac Individual Consul 2021-12-2 2022-01-1 2022-02-1 2022-08-1 Recrutement d'un Responsa IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2021-11-01 tant Selection 0 0 4 3 ble des Investissements ains CI-FIRCA-265318-CS-INDV / Component 4: Project Coor Individual Consul 2022-01-2 2022-02-1 2022-03-1 2022-09-1 Sélection par Entente Direct IDA / 69360 Post Direct 0.00 Canceled 2022-01-10 dination and Management tant Selection 0 0 7 3 e de trois (03) spécialistes cl usters CI-FIRCA-258144-CS-INDV / Sélection d’un consultant in Component 3: Policy Refor dividuel pour la Finalisation Individual Consul 2021-11-0 2021-11-2 2021-12-2 2022-06-2 IDA / 69360 ms and Institutional Reinfor Post Limited 0.00 Canceled 2021-10-29 des TDR dans le cadre de la tant Selection 3 4 9 7 cement mise en place du modèle éc onomique et financier des z ones industrielles CI-FIRCA-256897-CS-INDV / Recrutement d'un consultan t international (de formation Component 2: Improving ac superviseur) pendant la dur Individual Consul 2022-02-0 2022-03-0 2022-04-0 2022-10-0 IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2021-12-21 ée du projet (1 mission tous tant Selection 8 1 5 2 ains les 3 mois plus appui à dista nce) - assistance perlée pou r aider mission d'accompag nement de supervision sur p lace CI-FIRCA-256932-CS-INDV / Component 2: Improving ac Recrutement d'un consultan Individual Consul 2022-02-2 2022-03-1 2022-04-1 2022-10-1 IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2022-01-04 t individuel en charge de la tant Selection 2 5 9 6 ains maintenance du SIG durant la durée du projet CI-FIRCA-257205-CS-INDV / Recrutement d’un(e) Spécia Component 4: Project Coor Individual Consul 2022-01-1 2022-02-0 2022-03-1 2022-09-1 IDA / 69360 Post Open 0.00 Canceled 2021-11-30 liste en sauvegarde environ dination and Management tant Selection 8 8 5 1 nementale et sociale CI-FIRCA-257241-CS-INDV / Component 2: Improving ac Individual Consul 2022-02-1 2022-03-0 2022-04-1 2022-10-0 Recrutement d'un Consultan IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2021-12-28 tant Selection 5 8 2 9 t administratif ains CI-FIRCA-254487-CS-INDV / Recrutement d’un Consulta Component 4: Project Coor Individual Consul 2021-10-0 2021-10-2 2021-11-2 2022-05-2 nt pour la rédaction du man IDA / V3490 Post Limited 0.00 Canceled 2021-09-27 dination and Management tant Selection 2 3 7 6 uel de Gestion Environneme ntal et Social (SGES) de la C DC-CI CI-FIRCA-237651-CS-INDV / Component 4: Project Coor Individual Consul 2021-08-2 2021-09-1 2021-10-1 2022-04-1 Sélection d'un informaticien IDA / V3490 Post Open 0.00 Canceled 2021-07-02 dination and Management tant Selection 0 0 5 3 pour le PPCET CI-FIRCA-257113-CS-INDV / Component 2: Improving ac Individual Consul 2022-03-1 2022-04-0 2022-05-1 2022-11-0 Recrutement de 4 experts i IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2022-01-25 tant Selection 5 5 0 6 ndépendants du Comité d'In ains vestissement CI-FIRCA-283020-CS-INDV / Component 4: Project Coor Individual Consul Under Implemen 2022-05-1 2022-05-2 2022-05-1 2022-06-1 2022-05-2 2022-07-2 2023-01-1 Recrutement d'un informati IDA / 69360 Post Limited 0.00 2022-05-23 dination and Management tant Selection tation 8 8 6 8 7 3 9 cien pour le PCCET CI-FIRCA-189854-CS-INDV / Component 4: Project Coor Individual Consul 2021-03-1 2021-03-3 2021-05-0 2021-11-0 Recrutement d'un spécialist / Post Open 0.00 Canceled 2021-01-20 dination and Management tant Selection 0 1 5 1 e en mesures de sauvegard e sociale CI-FIRCA-257238-CS-INDV / Recrutement d'un consultan Component 1: Improving th Individual Consul 2023-04-2 2023-05-1 2023-06-2 2023-12-1 t individuel pour préparer d IDA / 69360 e Competitiveness of Suppo Post Open 0.00 Canceled 2023-03-07 tant Selection 5 6 0 7 es spécifications techniques rted Value Chains pour des chaines de valeur appuyés (n°3) CI-FIRCA-258145-CS-INDV / Component 2: Improving ac Individual Consul 2022-02-0 2022-02-2 2022-04-0 2022-10-0 Recrutement d'un Analyste IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2021-12-20 tant Selection 7 8 4 1 pour appuyer le Secrétariat ains Technique CI-FIRCA-283029-CS-INDV / RECRUTEMENT D'UN CONSU Component 2: Improving ac LTANT INDIVIDUEL EXPERT Individual Consul 2022-06-2 2022-07-1 2022-08-1 2023-02-1 IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2022-05-02 EN MATIERE DE REGLEMENT tant Selection 0 1 5 1 ains ATION ET DE SUPERVISION DES INSTITUTIONS DE MICR OFINANCE CI-FIRCA-244478-CS-INDV / Component 2: Improving ac Individual Consul 2021-07-2 2021-10-1 2021-11-0 2021-12-1 2022-06-1 Recrutement d'un Spécialist IDA / V3490 cess to finance for value ch Post Open 0.00 Canceled 2021-08-31 tant Selection 8 9 9 4 2 e en Sauvegarde Sociale po ains ur la CDC-CI CI-FIRCA-257214-CS-INDV / Component 4: Project Coor Individual Consul 2022-02-1 2022-03-0 2022-04-1 2022-10-1 IDA / 69360 Post Open 0.00 Canceled 2021-12-29 Recrutement d’un Informati dination and Management tant Selection 6 9 3 0 cien CI-FIRCA-283028-CS-INDV / RECRUTEMENT D'UN CONSU LTANT INDIVIDUEL POUR L'E Component 2: Improving ac LABORATION DU MANUEL D Individual Consul Under Implemen 2022-04-2 2022-04-3 2022-05-2 2022-06-2 2022-12-2 IDA / 69360 cess to finance for value ch Post Limited 0.00 2022-04-25 ES PROCEDURES DE GESTIO tant Selection tation 9 0 1 5 2 ains N OPERATIONNELLE, ADMINI STRATIVE, FINANCIERE, CO MPTABLE ET DE PASSATION DES MARCHES DE LA LTIF CI-FIRCA-257226-CS-INDV / Component 4: Project Coor Individual Consul 2022-03-1 2022-04-0 2022-05-1 2022-11-0 Recrutement d’un(e) Assista IDA / 69360 Post Open 0.00 Canceled 2022-01-26 dination and Management tant Selection 6 6 1 7 nte Spécialiste en Passation des Marchés CI-FIRCA-257211-CS-INDV / Component 4: Project Coor Individual Consul 2022-07-0 2022-07-2 2022-08-3 2023-02-2 Recrutement d’un Responsa IDA / 69360 Post Open 0.00 Canceled 2022-05-18 dination and Management tant Selection 6 7 1 7 ble Comptable et Financier CI-FIRCA-257209-CS-INDV / Component 4: Project Coor Individual Consul 2022-03-0 2022-03-2 2022-05-0 2022-10-3 Recrutement d’un(e) Spécia IDA / 69360 Post Open 0.00 Canceled 2022-01-18 dination and Management tant Selection 8 9 3 0 liste en passation des march és CI-FIRCA-257221-CS-INDV / Component 4: Project Coor Individual Consul 2022-01-1 2022-02-0 2022-03-0 2022-09-0 Recrutement d’un(e) chargé IDA / 69360 Post Open 0.00 Canceled 2021-11-24 dination and Management tant Selection 2 2 9 5 (e) des nouvelles technologi es CI-FIRCA-288803-CS-INDV / Recrutement d'un consultan Component 2: Improving ac t individuel spécialisé en dro Individual Consul 2022-05-3 2022-06-2 2022-07-2 2023-01-2 IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2022-04-11 it des affaires et droit fiscal tant Selection 0 0 5 1 ains en vue de l'assistance sur la structuration et la rédaction des documents juridiques d e la FILT CI-FIRCA-291626-CS-INDV / Recrutement d'un consultan Component 2: Improving ac t individuel en charge d’éval Individual Consul Under Implemen 2022-05-2 2022-07-0 2022-07-2 2022-08-2 2023-02-2 IDA / 69360 cess to finance for value ch Post Open 0.00 2022-05-16 uer les besoins des institutio tant Selection tation 3 4 5 9 5 ains ns de microfinance (IMF) en système d’information et de gestion (SIG) CI-FIRCA-291629-CS-INDV / Component 2: Improving ac Recrutement d'un consultan Individual Consul Pending Implem 2022-07-0 2022-07-2 2022-08-2 2023-02-2 IDA / 69360 cess to finance for value ch Post Open 0.00 2022-05-16 t individuel en charge de la tant Selection entation 4 5 9 5 ains maintenance du SIG durant la durée du projet CI-FIRCA-291630-CS-INDV / Recrutement d’un Consulta nt pour l’assistance juridiqu Component 1: Improving th e à l’acquisition d’équipeme Individual Consul 2022-08-1 2022-09-0 2022-10-1 2023-04-1 IDA / 69360 e Competitiveness of Suppo Post Open 0.00 Canceled 2022-07-01 nts de laboratoire pour la mi tant Selection 9 9 4 2 rted Value Chains se en conformité du laborat oire d’analyse des sols de l’ École Supérieure d’Agronom ie de l’INPHB à Yamoussouk ro CI-FIRCA-291632-CS-INDV / Component 2: Improving ac Recrutement d'un expert mi Individual Consul Under Implemen 2022-11-1 2022-07-0 2022-07-2 2022-08-2 2023-02-2 IDA / 69360 cess to finance for value ch Post Open 0.00 2022-05-16 crofinance pour assister l’U tant Selection tation 6 4 5 9 5 ains CP sur l'aspect technique du SIG en faveur des IMF CI-FIRCA-291635-CS-INDV / Recrutement d'un consultan Component 2: Improving ac Individual Consul 2022-06-2 2022-07-1 2022-08-1 2023-02-1 t individuel en vue de l'assis IDA / 69360 cess to finance for value ch Post Open 0.00 Canceled 2022-05-05 tant Selection 3 4 8 4 tance sur la structuration et ains la rédaction des documents juridiques de la FILT CI-FIRCA-291641-CS-INDV / Recrutement d’un Consulta nt pour la Component 3: Policy Refor réalisation d'une étude de r Individual Consul Pending Implem 2022-07-0 2022-07-2 2022-08-2 2023-02-2 IDA / 69360 ms and Institutional Reinfor Post Open 0.00 2022-05-15 ationalisation des licences e tant Selection entation 3 4 8 4 cement t permis d'affaires y compris revue règlementaire et prop ositions d'amendement des différents textes des ministè res techniques. Page 12 CI-FIRCA-291651-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor nt pour l’assistance à la réal Individual Consul 2022-07-2 2022-08-1 2022-09-1 2023-03-1 IDA / 69360 ms and Institutional Reinfor Post Open 0.00 Canceled 2022-06-01 isation des études techniqu tant Selection 0 0 4 3 cement es (APS, APD, DAO...) pour l a clôture de la zone industri elle d'Adzopé CI-FIRCA-291654-CS-INDV / Recrutement d'un Consultan Component 1: Improving th t individuel pour préparer le Individual Consul 2022-07-2 2022-08-1 2022-09-1 2023-03-1 IDA / 69360 e Competitiveness of Suppo Post Open 0.00 Canceled 2022-06-06 s spécifications techniques tant Selection 5 5 9 8 rted Value Chains de l’installation pilote de pro duction et de tests pour le c aoutchouc naturel et le plas tique CI-FIRCA-291659-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor nt pour l’assistance à la réal Individual Consul Pending Implem 2022-07-2 2022-08-1 2022-09-1 2023-03-1 IDA / 69360 ms and Institutional Reinfor Post Open 0.00 2022-06-01 isation des études environn tant Selection entation 0 0 4 3 cement ementales et sociales pour l a clôture de la zone industri elle d’Adzopé CI-FIRCA-291670-CS-INDV / Recrutement d’un Consulta nt pour l’assistance à la réal isation des études environn Component 3: Policy Refor Individual Consul 2022-07-2 2022-08-1 2022-09-1 2023-03-1 ementales et sociales pour l' IDA / 69360 ms and Institutional Reinfor Post Open 0.00 Canceled 2022-06-01 tant Selection 0 0 4 3 aménagement de l'échange cement ur Nord-Est de la zone indus trielle dans le cadre de l'em branchement de la voie Y4 à la zone industrielle Akoup é-Zeudji CI-FIRCA-291673-CS-INDV / Recrutement d’un Consulta nt pour l’assistance à la réal isation des études environn Component 3: Policy Refor Individual Consul 2022-07-2 2022-08-1 2022-09-1 2023-03-1 ementales et sociales pour l' IDA / 69360 ms and Institutional Reinfor Post Open 0.00 Canceled 2022-06-01 tant Selection 0 0 4 3 aménagement de l'échange cement ur Nord-Est de la zone indus trielle dans le cadre de l'em branchement de la voie Y4 à la zone industrielle Akoup é-Zeudji CI-FIRCA-291687-CS-INDV / Recrutement d’un Consulta nt pour l’assistance à la réal isation des études techniqu Component 3: Policy Refor Individual Consul 2022-07-2 2022-08-1 2022-09-1 2023-03-1 es (APS, APD, DAO) pour l'a IDA / 69360 ms and Institutional Reinfor Post Open 0.00 Canceled 2022-06-01 tant Selection 0 0 4 3 ménagement de l'échangeu cement r Nord-Est de la zone industr ielle dans le cadre de l'embr anchement de la voie Y4 à l a zone industrielle Akoupé-Z eudji CI-FIRCA-291679-CS-INDV / Recrutement d'un consultan t individuel pour la rédactio n des TdR et de la validation Component 1: Improving th Individual Consul 2022-05-2 2022-06-1 2022-07-1 2023-01-1 des rapports (volet pédologi IDA / 69360 e Competitiveness of Suppo Post Limited 0.00 Canceled 2022-05-16 tant Selection 1 1 6 2 e) dans le cadre de la mise rted Value Chains en place d’un système num érique de planification de la récolte et de cartographie d es sols dans les zones de pr odu CI-FIRCA-291680-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor Individual Consul Pending Implem 2022-07-2 2022-08-1 2022-09-1 2023-03-1 nt pour l’assistance à la con IDA / 69360 ms and Institutional Reinfor Post Open 0.00 2022-06-01 tant Selection entation 0 0 4 3 ception et l’opérationnalisati cement on du SIGETI (comprenant n otamment un module SIG) CI-FIRCA-291681-CS-INDV / Recrutement d'un consultan t individuel pour la rédactio n des TdR et de la validation Component 1: Improving th Individual Consul 2022-07-0 2022-07-2 2022-08-3 2023-02-2 des rapports (volet numériq IDA / 69360 e Competitiveness of Suppo Post Limited 0.00 Canceled 2022-07-01 tant Selection 6 7 1 7 ue) dans le cadre de la mise rted Value Chains en place d’un système num érique de planification de la récolte et de cartographie d es sols dans les zones de pr od CI-FIRCA-291682-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor Individual Consul Pending Implem 2022-08-1 2022-09-0 2022-10-1 2023-04-1 nt individuel pour renforcer l IDA / 69360 ms and Institutional Reinfor Post Open 0.00 2022-07-01 tant Selection entation 9 9 4 2 a compétence technique de cement s inspecteurs phytosanitaire s aux frontières CI-FIRCA-295046-CS-INDV / Recrutement d’un(e) électri cien(ne) pour la vérification Component 3: Policy Refor Individual Consul Under Implemen 2022-05-2 2022-06-1 2022-07-0 2022-08-1 2023-02-0 de l'état de l'installation inté IDA / 69360 ms and Institutional Reinfor Post Limited 0.00 2022-06-13 tant Selection tation 3 8 9 3 9 rieure d’électricité (ou diagn cement ostic électricité) des sites à équiper au niveau des servi ces d’inspection phytosanita ire CI-FIRCA-295058-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor Individual Consul 2022-07-0 2022-07-3 2022-09-0 2023-03-0 nt pour une assistance sur l IDA / 69360 ms and Institutional Reinfor Post Limited 0.00 Canceled 2022-07-04 tant Selection 9 0 3 2 a modernisation des archive cement s du guichet Unique du CEPI CI CI-FIRCA-295062-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor nt pour une assistance sur l’ Individual Consul 2022-07-0 2022-07-3 2022-09-0 2023-03-0 IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 Canceled 2022-07-04 acquisition d’équipements, tant Selection 9 0 3 2 cement de matériel informatique et de kits pour les services d’in spection phytosanitaire CI-FIRCA-295063-CS-INDV / Recrutement d’un Consulta Component 1: Improving th Individual Consul Pending Implem 2022-09-1 2022-10-0 2022-11-1 2023-05-1 nt pour la traduction (Anglai IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2022-09-12 tant Selection entation 7 8 2 1 s-Français, Français-Anglais) rted Value Chains des documents élaborés da ns le cadre de la composant e1 CI-FIRCA-295064-CS-INDV / Recrutement d’un Consulta Component 2: Improving ac Individual Consul Pending Implem 2022-09-1 2022-10-0 2022-11-1 2023-05-1 nt pour la traduction (Anglai IDA / 69350 cess to finance for value ch Post Limited 0.00 2022-09-12 tant Selection entation 7 8 2 1 s-Français, Français-Anglais) ains des documents élaborés da ns le cadre de la composant e2 CI-FIRCA-295065-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor Individual Consul Pending Implem 2022-09-1 2022-10-0 2022-11-1 2023-05-1 nt pour la traduction (Anglai IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 2022-09-12 tant Selection entation 7 8 2 1 s-Français, Français-Anglais) cement des documents élaborés da ns le cadre de la composant e3 CI-FIRCA-295066-CS-INDV / Recrutement d’un Consulta Component 4: Project Coor Individual Consul Pending Implem 2022-09-1 2022-10-0 2022-11-1 2023-05-1 nt pour la traduction (Anglai IDA / 69350 Post Limited 0.00 2022-09-12 dination and Management tant Selection entation 7 8 2 1 s-Français, Français-Anglais) des documents élaborés da ns le cadre de la composant e4 CI-FIRCA-295067-CS-INDV / Recrutement d’un Consulta Component 1: Improving th Individual Consul Under Implemen 2022-06-2 2022-09-1 2022-10-0 2022-11-0 2023-05-0 nt individuel (un universitair IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2022-09-05 tant Selection tation 3 0 1 5 4 e) membre des comités de v rted Value Chains alidation des subventions à coûts partagés CI-FIRCA-295070-CS-INDV / Recrutement d'un consultan t individuel pour la rédactio n des TdR dans le cadre de l Component 1: Improving th Individual Consul 2022-06-2 2022-07-1 2022-08-2 2023-02-1 a mise en place d’un systèm IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 Canceled 2022-06-20 tant Selection 5 6 0 6 e numérique de planificatio rted Value Chains n de la récolte et de cartogr aphie des sols dans les zone s de production d'hévéa,pal mier á huile,ananas,mangue ,karité CI-FIRCA-295102-CS-INDV / Recrutement d'un consultan Component 2: Improving ac Individual Consul 2022-05-2 2022-07-1 2022-08-0 2022-09-0 2023-03-0 t individuel expert en matièr IDA / 69350 cess to finance for value ch Post Open 0.00 Canceled 2022-05-23 tant Selection 3 1 1 5 4 e de règlementation et de s ains upervision des institutions d e microfinance CI-FIRCA-295120-CS-INDV / Recrutement d'un consultan Component 1: Improving th Individual Consul 2022-07-0 2022-07-3 2022-09-0 2023-03-0 t individuel pour la rédactio IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 Canceled 2022-07-04 tant Selection 9 0 3 2 n des TdRs dans le cadre de rted Value Chains la création d’une unité de fa brication d’emballage CI-FIRCA-295126-CS-INDV / Recrutement d'un consultan Component 1: Improving th t individuel pour la rédactio Individual Consul 2022-06-1 2022-07-0 2022-08-1 2023-02-0 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 Canceled 2022-06-13 n des TdRs dans le cadre de tant Selection 8 9 3 9 rted Value Chains la mise en place d’une usine moderne de transformation de fruits (mangue, ananas… ) CI-FIRCA-295131-CS-INDV / Recrutement d'un consultan t individuel pour la rédactio Component 1: Improving th Individual Consul 2022-06-2 2022-07-1 2022-08-2 2023-02-1 n des TdRs dans le cadre de IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 Canceled 2022-06-20 tant Selection 5 6 0 6 la mise en place de chambr rted Value Chains es froides de conservation d es produits agricoles dont le s fruits (ex. mangue et anan as) et le Karité CI-FIRCA-295207-CS-INDV / Component 4: Project Coor Individual Consul 2022-06-1 2022-07-0 2022-08-1 2023-02-0 Recrutement d'un juriste po IDA / 69350 Post Limited 0.00 Canceled 2022-06-13 dination and Management tant Selection 8 9 3 9 ur l'UC-PCCET CI-FIRCA-295347-CS-INDV / Component 1: Improving th Recrutement d'un Consultan Individual Consul Pending Implem 2022-09-1 2022-10-0 2022-11-0 2023-05-0 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2022-09-05 t individuel pour les mécani tant Selection entation 0 1 5 4 rted Value Chains smes des subventions à coû ts partagés CI-FIRCA-301789-CS-INDV / Recrutement d’un Consulta Component 4: Project Coor Individual Consul 2022-08-2 2022-09-1 2022-10-1 2023-04-1 IDA / 69350 Post Open 0.00 Canceled 2022-07-04 nt Individuel pour l’élaborati dination and Management tant Selection 2 2 7 5 on du manuel de suivi évalu ation du Projet CI-FIRCA-301795-CS-INDV / Recrutement d’un Consulta Component 1: Improving th nt individuel (un expert indé Individual Consul Under Implemen 2022-08-0 2022-08-0 2022-08-2 2022-10-0 2023-03-3 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2022-08-01 pendant – Hévéa) membre d tant Selection tation 1 6 7 1 0 rted Value Chains es comités de validation des subventions à coûts partagé s CI-FIRCA-301797-CS-INDV / Recrutement d’un Consulta Component 1: Improving th nt individuel (un expert indé Individual Consul Under Implemen 2022-08-0 2022-08-0 2022-08-2 2022-10-0 2023-03-3 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2022-08-01 pendant – Palmier à Huile) tant Selection tation 1 6 7 1 0 rted Value Chains membre des comités de vali dation des subventions à co ûts partagés Page 13 CI-FIRCA-301800-CS-INDV / Recrutement d’un Consulta Component 1: Improving th nt individuel (un expert indé Individual Consul 2022-08-0 2022-08-0 2022-08-2 2022-10-0 2023-03-3 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 Canceled 2022-08-01 pendant – Plastique) membr tant Selection 1 6 7 1 0 rted Value Chains e des comités de validation des subventions à coûts par tagés CI-FIRCA-301802-CS-INDV / Recrutement d’un Consulta Component 1: Improving th nt individuel (un expert indé Individual Consul Under Implemen 2022-08-0 2022-08-0 2022-08-2 2022-10-0 2023-03-3 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2022-08-01 pendant – Mangue) membre tant Selection tation 9 6 7 1 0 rted Value Chains des comités de validation d es subventions à coûts part agés CI-FIRCA-301803-CS-INDV / Recrutement d’un Consulta Component 1: Improving th Individual Consul Under Implemen 2022-07-1 2022-08-0 2022-08-2 2022-10-0 2023-03-3 nt individuel (un expert indé IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2022-08-01 tant Selection tation 4 6 7 1 0 pendant – Karité) membre d rted Value Chains es comités de validation des subventions à coûts partagé s CI-FIRCA-301805-CS-INDV / Recrutement d’un Consulta Component 1: Improving th nt individuel (un expert indé Individual Consul Under Implemen 2022-08-0 2022-08-0 2022-08-2 2022-10-0 2023-03-3 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2022-08-01 pendant – Ananas) membre tant Selection tation 9 6 7 1 0 rted Value Chains des comités de validation d es subventions à coûts part agés CI-FIRCA-301811-CS-INDV / Recrutement d’un Consulta nt international pour assiste r l’UC-PCCET et les services Component 3: Policy Refor Individual Consul Under Implemen 2022-07-1 2022-09-0 2022-09-2 2022-11-0 2023-05-0 de l’Etat dans la définition, l IDA / 69360 ms and Institutional Reinfor Post Open 0.00 2022-07-20 tant Selection tation 8 7 8 2 1 a mise en œuvre et le suivi cement des activités d’appui à la pol itique et au développement des zones industrielles / zon es économiques spéciales CI-FIRCA-295069-CS-INDV / Recrutement d’un Consulta Component 1: Improving th Individual Consul 2022-09-1 2022-10-0 2022-11-0 2023-05-0 nt individuel (un expert indé IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 Canceled 2022-09-05 tant Selection 0 1 5 4 pendant) membre des comit rted Value Chains és de validation des subvent ions à coûts partagés CI-FIRCA-291633-CS-INDV / Recrutement d’un Consulta nt pour l’assistance techniq Component 1: Improving th Individual Consul 2022-08-1 2022-09-0 2022-10-1 2023-04-1 ue à l’évaluation des besoin IDA / 69360 e Competitiveness of Suppo Post Open 0.00 Canceled 2022-07-01 tant Selection 9 9 4 2 s en acquisition d’équipeme rted Value Chains nts de laboratoire pour la mi se en conformité du laborat oire d’analyse des sols de l’ ESA de l'INPHB CI-FIRCA-318974-CS-CDS / Recrutement du Cabinet ST Component 3: Policy Refor UDI International pour réalis Under Implemen 2022-10-1 2022-10-2 2022-12-2 2023-06-2 IDA / 69350 ms and Institutional Reinfor Post Direct Selection Direct - National 0.00 2022-10-10 er les études en vue de l’em tation 1 0 4 2 cement branchement de la zone ind ustrielle d’AKOUPE ZEUDJI P K24 à l’autoroute périphériq ue Y4 CI-FIRCA-319289-CS-CDS / Sélection directe de M. DIAL Component 3: Policy Refor Under Implemen 2022-10-1 2022-11-2 2023-01-2 2023-07-2 LO LAMARANA SADIO, exper IDA / 69350 ms and Institutional Reinfor Post Direct Selection Direct - National 0.00 2022-11-14 tation 3 4 8 7 t en matière de règlementat cement ion et de supervision des ins titutions de microfinances. CI-FIRCA-328064-CS-INDV / Recrutement d’un consultan Component 3: Policy Refor t individuel en vue d’une as Individual Consul Open - Internation Under Implemen 2022-12-0 2023-01-1 2023-02-0 2023-03-1 2023-09-0 IDA / 69350 ms and Institutional Reinfor Post 0.00 2022-11-28 sistance technique pour la r tant Selection al tation 5 6 6 3 9 cement edynamisation du program me d’opérateurs économiqu es agréés CI-FIRCA-328086-CS-INDV / Recrutement d’un consultan Component 3: Policy Refor Individual Consul Open - Internation Under Implemen 2022-12-0 2023-01-1 2023-02-0 2023-03-1 2023-09-0 t individuel en vue d’une as IDA / 69350 ms and Institutional Reinfor Post 0.00 2022-11-28 tant Selection al tation 5 6 6 3 9 sistance technique pour un cement appui au processus de déter mination de la valeur en do uane CI-FIRCA-295073-CS-INDV / Recrutement d'un consultan t individuel pour la validatio Component 1: Improving th n des rapports (volet numéri Individual Consul Pending Implem 2023-02-2 2023-03-1 2023-04-2 2023-10-1 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2023-02-20 que) dans le cadre de la mis tant Selection entation 5 8 2 9 rted Value Chains e en place d’un système nu mérique de cartographie de s sols dans les zones de pro duction de l'hévéa, karité... CI-FIRCA-295072-CS-INDV / Recrutement d'un consultan t individuel pour la validatio Component 1: Improving th n des rapports (volet pédolo Individual Consul Pending Implem 2023-03-0 2023-03-2 2023-04-2 2023-10-2 IDA / 69350 e Competitiveness of Suppo Post Limited 0.00 2023-02-27 gie) dans le cadre de la mis tant Selection entation 4 5 9 6 rted Value Chains e en place d’un système nu mérique de cartographie de s sols dans les zones de pro duction d’hévéa, palmier à huile… CI-FIRCA-295061-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor Individual Consul 2022-07-0 2022-07-3 2022-09-0 2023-03-0 nt pour une assistance sur l IDA / 69350 ms and Institutional Reinfor Post Limited 0.00 Canceled 2022-07-04 tant Selection 9 0 3 2 a généralisation de l’IDU (Id cement entifiant Unique) des entrep rises à l’intérieur du pays CI-FIRCA-291645-CS-INDV / Recrutement d’un Consulta Component 3: Policy Refor nt pour l’assistance à la con Individual Consul 2022-07-0 2022-07-2 2022-08-2 2023-02-2 IDA / 69360 ms and Institutional Reinfor Post Open 0.00 Canceled 2022-05-15 ception et la réalisation de l tant Selection 3 4 8 4 cement a version 2 de la plateforme de création d'entreprises en ligne (e-gufe 2.0) CI-FIRCA-337118-CS-INDV / Sélection par entente direct Component 2: Improving ac Individual Consul Under Implemen 2023-01-2 2023-02-2 2023-03-1 2023-04-2 2023-10-1 e de Mme Aurélie PUJO, exp IDA / 69350 cess to finance for value ch Post Direct - National 0.00 2023-02-13 tant Selection tation 3 3 6 0 7 ert en capital investissemen ains t dans le cadre de l’opératio nnalisation de la FILT CI-FIRCA-340301-CS-INDV / Recrutement d’un consultan t individuel pour l’analyse d Component 1: Improving th e la demande future de zon Individual Consul Open - Internation 2023-06-0 2023-06-2 2023-07-3 2024-01-2 IDA / 69350 e Competitiveness of Suppo Post 0.00 Canceled 2023-04-17 es industrielles / zones écon tant Selection al 5 6 1 7 rted Value Chains omiques spéciales en côte d ’ivoire, y compris leur empla cement, leur capacité, et les services et infrastructures r equises CI-FIRCA-340302-CS-INDV / Recrutement d’un consultan t individuel pour assister l’U Component 1: Improving th C-PCCET et les services de l’ Individual Consul Open - Internation 2023-06-0 2023-06-2 2023-08-0 2024-01-2 IDA / 69350 e Competitiveness of Suppo Post 0.00 Canceled 2023-04-18 état dans l’analyse des proc tant Selection al 6 7 1 8 rted Value Chains édures de développement, d’opération, et de gestion d es zones industrielles / zone s économiques spéciales CI-FIRCA-357663-CS-INDV / Recrutement d’un consultan Component 1: Improving th t individuel en vue d’une as Individual Consul Open - Internation Under Implemen 2023-04-2 2023-06-1 2023-07-1 2023-08-1 2024-02-1 IDA / 69350 e Competitiveness of Suppo Post 0.00 2023-05-01 sistance technique générale tant Selection al tation 3 9 0 4 0 rted Value Chains à l’UC-PCCET dans le cadre de la mise en place d’une u nité de transformation de ka rité CI-FIRCA-362209-CS-CDS / Sélection directe du groupe ment Timeforsense-Keir and Component 1: Improving th Associates pour la réalisatio Direct - Internatio Under Implemen 2023-06-0 2023-06-1 2023-08-1 2024-02-1 IDA / 69350 e Competitiveness of Suppo Post Direct Selection 0.00 2023-06-05 n d'études techniques pour l nal tation 8 5 9 5 rted Value Chains a mise en place d'une usine moderne de transformation de fruits (dont la mangue et d'autres fruits, le cas échéa nt) CI-FIRCA-364377-CS-INDV / Recrutement d’un consultan t individuel pour assister L’U Component 2: Improving ac C-PCCET et les services de l’ Individual Consul Open - Internation Under Implemen 2023-06-0 2023-09-0 2023-09-2 2023-10-3 2024-04-2 IDA / 69360 cess to finance for value ch Post 0.00 2023-07-17 Etat dans l’analyse des proc tant Selection al tation 7 4 5 0 7 ains édures de développement, d’opération, et de gestion d es zones industrielles / zone s économiques spéciales CI-FIRCA-364379-CS-INDV / Recrutement d’un consultan t individuel pour l’analyse d Component 2: Improving ac e la demande future de zon Individual Consul Open - Internation Under Implemen 2023-06-0 2023-09-0 2023-09-2 2023-10-3 2024-04-2 IDA / 69360 cess to finance for value ch Post 0.00 2023-07-17 es industrielles / zones écon tant Selection al tation 7 4 5 0 7 ains omiques spéciales en côte d ’ivoire, y compris leur empla cement, leur capacité, et les services et infrastructures r equises CI-FIRCA-364382-CS-INDV / Recrutement d’un consultan t individuel pour l’élaboratio Component 3: Policy Refor Individual Consul Open - Internation Under Implemen 2023-06-0 2023-09-1 2023-10-0 2023-11-0 2024-05-0 n du manuel des procédures IDA / 69360 ms and Institutional Reinfor Post 0.00 2023-07-24 tant Selection al tation 7 1 2 6 4 et des modes opératoires en cement vue de la mise en applicatio n de l’Identifiant Unique du Foncier de Côte d’Ivoire (ID UFCI) CI-FIRCA-366281-CS-INDV / Sélection directe de M'BO Ja Component 4: Project Coor Individual Consul 2023-06-1 2023-07-0 2023-07-2 2023-08-3 2024-02-2 IDA / 69350 Post Direct - National 0.00 Under Review 2023-06-26 cques Consultant informatici dination and Management tant Selection 6 6 7 1 7 en du PCCET pour la durée du Projet Page 14 MONGOLIA ADDITIONAL FINANCING TO ULAANBAATAR CLEAN AIR PROJECT (P167421) PROJECT PROCUREMENT PLAN May 18, 2020 1 PROCUREMENT PLAN Project information: Additional Financing to Ulaanbaatar Clean Air Project (P167421) Project Implementation agency: AF UBCAP Project Implementation Unit Date of the Procurement Plan: June 2020 Period covered by this Procurement Plan: From 1st June 2020 to 31st December 2021 1. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking of Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. 2. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. 3. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. 3.1 National Open Competitive Procurement When the Borrower uses its own national open competitive procurement arrangements as set forth in Chapter Two of the Public Procurement Law of Mongolia enacted on December 1, 2005, as amended several times with the latest amendment on March 22, 2019, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Participation in Bidding and Preferences (i) Government-owned enterprises in Mongolia shall be eligible to participate in bidding only if they can establish that they are legally and financially autonomous, operate under commercial law, and are not a dependent of the agency contracting them. 2 (ii) A bidder declared ineligible by the World Bank, based on a determination by the World Bank that the bidder has engaged in corrupt, fraudulent, collusive, coercive or obstructive practices in competing for or in executing a World Bank- financed contract, shall be ineligible to participate and be awarded a World Bank-financed contract during the period determined by the World Bank. (iii) A firm which has been engaged by the Borrower to provide consulting services for the preparation or implementation of a project, and any of its affiliates, shall be disqualified from subsequently providing goods or works resulting from or directly related to the firm’s consulting services for such preparation or implementation. This provision does not apply to the various firms which together are performing the contractor’s obligations under a turnkey or design and build contract. (iv) Interested foreign bidders from eligible countries shall be allowed to participate without being required to associate or form joint ventures with local bidders. Foreign bidders shall be eligible to participate in bidding under the same conditions as local bidders. Mongolian bidders and goods of Mongolian origin shall be given no preference over foreign bidders, either in the bidding process or in the evaluation of bids. (v) Prior registration shall not be a requirement for any bidder to participate in bidding. (b) Request for Bids / Request for Proposals Documents (i) The request for bids/request for proposals documents shall be acceptable to the World Bank and include the WB’s provisions for fraud and corruption. (ii) In the case of contracts of more than eighteen (18) months’ duration, the procurement documents and the contract shall provide for price adjustment, based on a formula acceptable to the World Bank, which shall be disclosed to the bidders in the procurement documents. (iii) Unless agreed and established in the procurement plan, there shall be no post-bidding negotiations. No bidder shall be required, as a condition for the award of contract, to change his bid price or otherwise materially alter his bid after it has been submitted. (c) Assessment of Bidder’s Qualification Qualification criteria shall be clearly specified in the bidding documents, and only criteria so specified, shall be used to determine whether a bidder is qualified. The evaluation of the bidder’s 3 qualifications shall be conducted separately from the technical and commercial evaluation of the bid. When post qualification is applied, the assessment of bidder’s qualifications shall be carried out only after the preliminary and detailed evaluation of bids has been completed by the Recipient and, in doing so, the qualifications of the bidder who has submitted the lowest evaluated substantially responsive bid or most advantageous bid shall be assessed first. The evaluation of a bidder’s qualifications shall only take into account the bidder’s capacity and resources to perform the contract, specifically its experience and past performance on similar contracts, capabilities with respect to personnel, equipment and construction or manufacturing facilities and financial capacity. In carrying out the bid evaluation including the post-qualification assessment, the Recipient shall exercise reasonable judgment in requesting clarifications in writing from Bidders in accordance with the provisions established in the procurement documents. No bidders shall be disqualified on the ground that the bidder has tax debt. 3.2 Other National Procurement Arrangements When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. The request for bids / request for proposals / request for quotations documents should be acceptable to the Bank and jointly with the signed contract shall include the clauses related to World Bank’s Policy in regard to corrupt and fraudulent practices. The request for bids / request for proposals / request for quotations documents and the signed contract shall also include the clauses allowing the World Bank to inspect the site and/or all accounts and records relating to the performance of the contract and the submission of the bid or proposal, and to have such accounts and records audited. The standard text is attached hereafter. 4. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. 5. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not applicable. 6. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): Not applicable. 7. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not applicable. 8. Other Relevant Procurement Information: Not applicable. 9. Standard Text for Fraud & Corruption and Inspection & Audit Fraud and The Bank requires compliance with the Bank’s Anti- 4 Corruption Corruption Guidelines and its prevailing sanctions policies and procedures as set forth in the WBG’s Sanctions Framework, as set forth in Appendix to the GC. The Employer / Purchaser / Client requires the Contractor / Supplier / the Consultant to disclose any commissions or fees that may have been paid or are to be paid to agents or any other party with respect to the bidding /selection process or execution of the Contract. The information disclosed must include at least the name and address of the agent or other party, the amount and currency, and the purpose of the commission, gratuity or fee. Failure to disclose such commissions, gratuities or fees may result in termination of the Contract and/or sanctions by the Bank. Inspections The Contractor / Supplier / Consultant shall keep and and Audit shall make all reasonable efforts to cause its by the Subcontractors and Sub-consultants to keep, accurate Bank and systematic accounts and records in respect of the Works / Goods / Services in such form and details as will clearly identify relevant time changes and costs. Pursuant to paragraph 2.2 e. of Appendix to the General Conditions the Contractor / Supplier / Consultant shall permit and shall cause its subcontractors and sub-consultants to permit, the Bank and/or persons appointed by the Bank to inspect the Site and/or the accounts and records relating to the performance of the Contract and the submission of the bid / proposal, and to have such accounts and records audited by auditors appointed by the Bank if requested by the Bank. The Contractor’s / Supplier’s / Consultant’s and its Subcontractors’ and sub- consultants’ acts intended to materially impede the exercise of the Bank’s inspection and audit rights constitute a prohibited practice subject to contract termination (as well as to a determination of ineligibility pursuant to the Bank’s prevailing sanctions procedures). 5 Procurement thresholds, per method (US$ thousand) International National Request for Quotations Competitive Competitive (RFQ) Procurement Procurement Works Goods/N Works Goods/N Works Goods/NC C C >5,00 >1,000 <5,000 < 1,000 <200 <100 0 Prior reviews threshold is shown below: Prior reviews threshold for Mongolia – 2017-2019 Category High and Moderate and low risk Substantial risk Works >US$ 1 million US$ > 1.5 million Goods – NC >US$ 500,000 US$ > 500,000 Consulting >US$ 400,000 US$ > 600,000 services (firm) Individual >US$ 150,000 > US$ 200,000 consultants 6 APPENDIX TO GENERAL CONDITIONS Fraud and Corruption (Text in this Appendix shall not be modified) 1. Purpose 1.1 The Bank’s Anti-Corruption Guidelines and this annex apply with respect to procurement under Bank Investment Project Financing operations. 2. Requirements 2.1 The Bank requires that Borrowers (including beneficiaries of Bank financing); bidders, consultants, contractors and suppliers; any sub- contractors, sub-consultants, service providers or suppliers; any agents (whether declared or not); and any of their personnel, observe the highest standard of ethics during the procurement process, selection and contract execution of Bank-financed contracts, and refrain from Fraud and Corruption. 2.2 To this end, the Bank: a. Defines, for the purposes of this provision, the terms set forth below as follows: i. “corrupt practice” is the offering, giving, receiving, or soliciting, directly or indirectly, of anything of value to influence improperly the actions of another party; ii. “fraudulent practice” is any act or omission, including misrepresentation, that knowingly or recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to avoid an obligation; iii. “collusive practice” is an arrangement between two or more parties designed to achieve an improper purpose, including to influence improperly the actions of another party; iv. “coercive practice” is impairing or harming, or threatening to impair or harm, directly or indirectly, any party or the property of the party to influence improperly the actions of a party; v. “obstructive practice” is: (a) deliberately destroying, falsifying, altering, or concealing of evidence material to the investigation or making false statements to investigators in order to materially impede a Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive practice; and/or threatening, harassing, or intimidating any party to prevent it from disclosing its knowledge of matters 7 relevant to the investigation or from pursuing the investigation; or (b) acts intended to materially impede the exercise of the Bank’s inspection and audit rights provided for under paragraph 2.2 e. below. b. Rejects a proposal for award if the Bank determines that the firm or individual recommended for award, any of its personnel, or its agents, or its sub-consultants, sub-contractors, service providers, suppliers and/ or their employees, has, directly or indirectly, engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices in competing for the contract in question; c. In addition to the legal remedies set out in the relevant Legal Agreement, may take other appropriate actions, including declaring mis-procurement, if the Bank determines at any time that representatives of the Borrower or of a recipient of any part of the proceeds of the loan engaged in corrupt, fraudulent, collusive, coercive, or obstructive practices during the procurement process, selection and/or execution of the contract in question, without the Borrower having taken timely and appropriate action satisfactory to the Bank to address such practices when they occur, including by failing to inform the Bank in a timely manner at the time they knew of the practices; d. Pursuant to the Bank’s Anti- Corruption Guidelines and in accordance with the Bank’s prevailing sanctions policies and procedures, may sanction a firm or individual, either indefinitely or for a stated period of time, including by publicly declaring such firm or individual ineligible (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;1 (ii) to be a nominated2 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project; e. Requires that a clause be included in bidding/request for proposals documents and in contracts financed by a Bank loan, requiring (i) bidders, consultants, contractors, and suppliers, 1 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 2 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 8 and their sub-contractors, sub-consultants, service providers, suppliers, agents personnel, permit the Bank to inspect3 all accounts, records and other documents relating to the submission of bids and contract performance, and to have them audited by auditors appointed by the Bank. 3 Inspections in this context usually are investigative (i.e., forensic) in nature. They involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to: accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third party verification of information. 9 PROCUREMENT Mongolia : Ulaanbaatar Clean Air Project PLAN General Information Country: Mongolia 2020-03-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P122320 GPN Date: 2020-05-23 Project Name: Ulaanbaatar Clean Air Project Loan / Credit No: IDA / 64930, IDA / 50390 UBCAP PIU Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AFA2-01 / Works (dismantlin A. Ger Area Particulate Matt Single Stage - One E 2021-06-1 g of HOB/s and connection to IDA / 64930 Post Request for Bids Open - National 600,000.00 312,060.70 Completed 2020-08-26 2020-07-30 2020-08-31 2020-10-12 2020-09-07 2020-11-11 2020-09-09 2020-12-16 2020-09-16 er Mitigation nvelope 4 district heating network) AFD3-01 / Supply and install ation of last mile rewiring, el D. Electricity for heating in t 2021-08-2 IDA / 64930 Post Direct Selection Direct 120,000.00 0.00 Canceled 2020-07-16 2020-09-13 2020-07-21 2020-07-27 2020-08-25 ectricity meter, in-box amper argeted ger areas 5 e breaker, and ETS monthly i nstallments collection AFD3 / Supply and Installatio D. Electricity for heating in t Request for Quota Single Stage - One E 2021-12-3 IDA / 64930 Post Limited 30,000.00 27,625.14 Signed 2021-01-29 2021-01-28 2021-02-15 2021-02-22 n of 2 tariff meters differenti argeted ger areas tions nvelope 1 al AFCA3-01 / Insulation and re Request for Quota A. Ger Area Particulate Matt Request for Quota Single Stage - One E 2022-01-0 trofitting work for school No IDA / 64930 Post Limited tions (Non Bank-S 195,000.00 197,903.33 Completed 2021-06-28 2021-07-24 2021-07-24 2021-08-17 er Mitigation tions nvelope 1 37, Chingeltei duureg PD) AFCA3-03 / Insulation and re Request for Quota A. Ger Area Particulate Matt Request for Quota Single Stage - One E 2021-12-3 trofitting work for kindergart IDA / 64930 Post Limited tions (Non Bank-S 199,000.00 209,721.39 Completed 2021-06-28 2021-07-24 2021-07-23 2021-08-17 er Mitigation tions nvelope 1 en No 133, Bayangol district PD) AFCA3-04 / Insulation and re Request for Quota A. Ger Area Particulate Matt Request for Quota Single Stage - One E 2021-12-3 trofitting work for kindergart IDA / 64930 Post Limited tions (Non Bank-S 165,000.00 223,834.30 Completed 2021-06-28 2021-07-24 2021-07-23 2021-08-17 er Mitigation tions nvelope 1 en No 114, Bayangol district PD) AFCA3-05 / Insulation and re Request for Quota A. Ger Area Particulate Matt Request for Quota Single Stage - One E 2021-12-3 trofitting work for kindergart IDA / 64930 Post Limited tions (Non Bank-S 165,000.00 172,342.73 Completed 2021-06-28 2021-07-24 2021-07-23 2021-08-17 er Mitigation tions nvelope 1 en No 83, (selected for geoth PD) ermal heat pump) Request for Bids - AFB1-01 / Thermal renovatio B. Central Ulaanbaatar Parti Single Stage - One E Works (without pr 2021-12-3 n for precast concrete apart IDA / 64930 Post Request for Bids Open - National 330,000.00 0.00 Canceled 2021-07-02 2021-08-13 2021-07-06 2021-08-05 2021-08-13 2021-08-20 culate Matter Mitigation nvelope equalification) SP 1 ment buildings (9 floor apart D ment) Request for Bids - AFB1-02 / Thermal renovatio B. Central Ulaanbaatar Parti Single Stage - One E Works (without pr 2021-12-3 n for precast concrete apart IDA / 64930 Post Request for Bids Open - National 330,000.00 244,539.92 Completed 2021-07-02 2021-08-12 2021-07-06 2021-08-05 2021-09-13 2021-08-13 2021-09-14 2021-08-20 2021-09-17 culate Matter Mitigation nvelope equalification) SP 1 ment buildings (9-floors apar D tment) AFB1-03 / Thermal renovatio Request for Quota B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E 2021-12-3 n for precast concrete apart IDA / 64930 Post Limited tions (Non Bank-S 170,000.00 203,943.24 Completed 2021-07-09 2021-07-24 2021-08-09 2021-08-17 culate Matter Mitigation tions nvelope 1 ment buildings (5-floors apar PD) tment) AFB1-04 / Thermal renovatio Request for Quota B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E 2021-12-3 n for precast concrete apart IDA / 64930 Post Limited tions (Non Bank-S 170,000.00 202,163.05 Completed 2021-07-09 2021-08-23 2021-08-09 2021-08-28 culate Matter Mitigation tions nvelope 1 ment buildings (5-floors apar PD) tment) AFA2-02 / Dismantling of HO Request for Bids - B/s and connection to district A. Ger Area Particulate Matt Single Stage - One E Works (without pr 2021-12-3 IDA / 64930 Post Request for Bids Open - National 370,000.00 223,623.61 Completed 2021-07-28 2021-08-25 2021-07-30 2021-08-29 2021-09-23 2021-09-03 2021-09-24 2021-09-10 2021-09-28 heating network (Songinokha er Mitigation nvelope equalification) SP 1 irkhan district, HOB for schoo D l No 42) Request for Bids - AFA2-03 / Dismantling of HO A. Ger Area Particulate Matt Single Stage - One E Works (without pr 2021-12-3 B/s and connection to district IDA / 64930 Post Request for Bids Open - National 370,000.00 0.00 Canceled 2021-07-28 2021-08-25 2021-07-30 2021-08-29 2021-09-03 2021-09-10 er Mitigation nvelope equalification) SP 1 heating network D National Procure AFCA2 / Survey, design and ment Document - demonstration of Pilot projec A. Ger Area Particulate Matt Single Stage - One E 2021-12-3 IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 280,000.00 286,447.76 Signed 2021-07-16 2021-08-11 2021-07-19 2021-08-18 2021-09-10 2021-08-27 2021-09-14 2021-09-06 2021-09-25 t on Geothermal heat pump f er Mitigation nvelope 1 ss (Non Bank-SPD or kindergartens in ger area ) National Procure AFCA3-02 / Insulation and re ment Document - A. Ger Area Particulate Matt Single Stage - One E 2021-12-3 trofitting work for school No IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 240,000.00 403,486.84 Completed 2021-07-01 2022-04-11 2021-07-02 2021-08-02 2022-05-20 2021-08-09 2022-05-25 2021-08-25 2022-06-07 er Mitigation nvelope 1 49, Chingeltei district ss (Non Bank-SPD ) AFD3-02 / Supply and Install A. Ger Area Particulate Matt Other (with field f 2022-02-0 ation of last-mile rewiring, el IDA / 64930 Post Direct Selection Direct 74,000.00 73,512.58 Completed 2021-08-03 2021-08-04 2021-08-05 2021-07-29 2021-08-09 2021-08-05 er Mitigation or explanation) 5 ectricity meter, distribution b ox, and grounding AFA2-03-1 / Dismantling of H Request for Quota A. Ger Area Particulate Matt Request for Quota Single Stage - One E 2021-12-3 OB/s and connection to distri IDA / 64930 Post Limited tions (Non Bank-S 70,000.00 46,282.62 Completed 2021-11-15 2021-08-06 2021-12-01 2021-08-26 er Mitigation tions nvelope 0 ct heating network PD) AFB1-01-1 / Thermal renovat Request for Quota A. Ger Area Particulate Matt Request for Quota Single Stage - One E 2021-12-3 ion for precast concrete apar IDA / 64930 Post Limited tions (Non Bank-S 170,000.00 187,165.99 Completed 2021-11-15 2021-11-11 2021-12-01 2021-08-28 er Mitigation tions nvelope 0 tment No 8b, Somginokhairk PD) han district Request for Bids - AFCA3-06 / Insulation and re A. Ger Area Particulate Matt Single Stage - One E Small Works SPD 2022-09-3 IDA / 64930 Post Request for Bids Open - National 240,000.00 243,370.94 Completed 2022-04-01 2022-04-11 2022-04-06 2022-05-18 2022-05-20 2022-05-31 2022-05-25 2022-06-15 2022-06-16 trofitting work for school No . er Mitigation nvelope (1 envelope proce 0 . ss) Request for Bids - AFCA3-07 / Insulation and re A. Ger Area Particulate Matt Single Stage - One E Small Works SPD 2022-09-3 IDA / 64930 Post Request for Bids Open - National 240,000.00 0.00 Canceled 2022-04-01 2022-04-06 2022-05-18 2022-05-31 2022-06-15 trofitting work for school No.. er Mitigation nvelope (1 envelope proce 0 . ss) Request for Bids - AFCA3-08 / Insulation and re A. Ger Area Particulate Matt Single Stage - One E Small Works SPD 2022-09-3 IDA / 64930 Post Request for Bids Open - National 220,000.00 205,004.65 Signed 2022-04-01 2022-04-11 2022-04-06 2022-05-18 2022-05-20 2022-05-31 2022-05-25 2022-06-15 2022-06-16 trofitting work for kindergart er Mitigation nvelope (1 envelope proce 0 en No... ss) Request for Bids - AFCA3-09 / Insulation and re A. Ger Area Particulate Matt Single Stage - One E Small Works SPD 2022-09-3 IDA / 64930 Post Request for Bids Open - National 220,000.00 0.00 Canceled 2022-04-01 2022-04-06 2022-05-18 2022-05-31 2022-06-15 trofitting work for kindergart er Mitigation nvelope (1 envelope proce 0 en No... ss) Request for Bids - AFB1-05 / Thermal renovatio B. Central Ulaanbaatar Parti Single Stage - One E Small Works SPD 2022-09-3 n for precast concrete apart IDA / 64930 Post Request for Bids Open - National 210,000.00 0.00 Canceled 2022-04-04 2022-04-09 2022-05-21 2022-06-03 2022-06-15 culate Matter Mitigation nvelope (1 envelope proce 0 ment buildings No.. ss) Page 1 Request for Bids - AFB1-07 / Thermal renovatio B. Central Ulaanbaatar Parti Single Stage - One E Small Works SPD 2022-09-3 n for precast concrete apart IDA / 64930 Post Request for Bids Open - National 250,000.00 0.00 Canceled 2022-04-04 2022-04-09 2022-05-21 2022-06-03 2022-06-15 culate Matter Mitigation nvelope (1 envelope proce 0 ment buildings No.. ss) Request for Bids - AFB1-08 / Thermal renovatio B. Central Ulaanbaatar Parti Single Stage - One E Small Works SPD 2022-09-3 n for precast concrete apart IDA / 64930 Post Request for Bids Open - National 250,000.00 0.00 Canceled 2022-04-04 2022-04-09 2022-05-21 2022-06-03 2022-06-15 culate Matter Mitigation nvelope (1 envelope proce 0 ment buildings No ss) Request for Bids - AFA2-04 / Dismantling of HO A. Ger Area Particulate Matt Single Stage - One E Small Works SPD 2022-11-0 B/s and connection to district IDA / 64930 Post Request for Bids Open - National 300,000.00 0.00 Signed 2022-06-02 2022-09-19 2022-06-07 2022-07-19 2022-10-31 2022-07-29 2022-11-02 2022-08-15 er Mitigation nvelope (1 envelope proce 1 heating network ss) Request for Bids - AFA2-05 / Dismantling of HO A. Ger Area Particulate Matt Single Stage - One E Small Works SPD 2022-10-3 B/s and connection to district IDA / 64930 Post Request for Bids Open - National 300,000.00 160,689.10 Completed 2022-06-02 2022-06-30 2022-06-07 2022-07-19 2022-08-12 2022-07-29 2022-08-12 2022-08-15 2022-09-01 er Mitigation nvelope (1 envelope proce 0 heating network ss) Request for Bids - AFBW1 / Construction of Gre B. Central Ulaanbaatar Parti Single Stage - One E Small Works SPD Pending Imp 2022-08-0 IDA / 64930 Post Request for Bids Open - National 450,000.00 0.00 2022-03-15 2022-03-20 2022-04-22 2022-04-29 2022-05-05 ening facilities culate Matter Mitigation nvelope (1 envelope proce lementation 1 ss) AFCA3-09-1 / Insulation and Request for Quota retrofitting work for kinderga A. Ger Area Particulate Matt Request for Quota Single Stage - One E 2022-12-2 IDA / 64930 Post Limited tions (Non Bank-S 121,000.00 102,298.80 Completed 2022-05-02 2022-05-16 2022-06-27 2022-06-16 rten No 154, 12 khoroo, Chin er Mitigation tions nvelope 4 PD) geltei district, Ulaanbaatar AFCA3-07-1 / Insulation and Request for Quota retrofitting work for kinderga A. Ger Area Particulate Matt Request for Quota Single Stage - One E 2022-12-2 IDA / 64930 Post Limited tions (Non Bank-S 107,000.00 90,654.61 Completed 2022-05-02 2022-05-16 2022-06-27 2022-06-18 rten No 208, 8 khoroo, Nalaik er Mitigation tions nvelope 4 PD) h district, Ulaanbaatar AFB1-05-1 / Thermal renovat Request for Quota ion for precast concrete apar B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E 2022-12-2 IDA / 64930 Post Limited tions (Non Bank-S 112,230.00 106,400.01 Completed 2022-05-02 2022-05-16 2022-06-27 2022-06-18 tment buildings No U-4, 18 k culate Matter Mitigation tions nvelope 4 PD) horoo, Somginokhairkhan dis trict, Ulaanbaatar AFB1-07-1 / Thermal renovat Request for Quota ion for precast concrete apar B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E 2022-12-2 IDA / 64930 Post Limited tions (Non Bank-S 140,890.00 130,319.74 Completed 2022-05-02 2022-05-16 2022-06-27 2022-06-25 tment buildings No 1-58, 19 culate Matter Mitigation tions nvelope 4 PD) khoroo, Songinokhairkhan dis trict, Ulaanbaatar AFB1-08-1 / Thermal renovat Request for Quota ion for precast concrete apar B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E 2022-12-2 IDA / 64930 Post Limited tions (Non Bank-S 112,600.00 104,193.46 Completed 2022-05-02 2022-05-16 2022-06-27 2022-06-25 tment buildings No 2-60, 19 culate Matter Mitigation tions nvelope 4 PD) khoroo, Songinokhairkhan dis trict, Ulaanbaatar AFB1-06-1 / Thermal renovat Request for Quota B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E 2022-12-3 ion for precast concrete apar IDA / 64930 Post Limited tions (Non Bank-S 186,890.00 177,702.27 Completed 2022-05-17 2022-05-16 2022-06-21 2022-06-16 culate Matter Mitigation tions nvelope 1 tment No 2G, 13 khoroo, Bay PD) angol district AFA2-06 / Small work for cut National Procure ting external heating pipeline ment Document - relating to the "Dismantling o A. Ger Area Particulate Matt 2022-07-0 IDA / 64930 Post Direct Selection Direct 1 Envelope proce 7,000.00 9,286.00 Completed 2022-06-28 2022-06-29 2022-06-28 2022-06-27 2022-06-29 2022-07-09 f HOBs and connection to the er Mitigation 5 ss (Non Bank-SPD district heating network in 6t ) h khoroo, Khan-Uul district" Request for Bids - AFB1-06 / Thermal renovatio B. Central Ulaanbaatar Parti Single Stage - One E Small Works SPD 2022-09-3 n for precast concrete apart IDA / 64930 Post Request for Bids Open - National 250,000.00 0.00 Canceled 2022-04-04 2022-04-09 2022-05-21 2022-06-03 2022-06-15 culate Matter Mitigation nvelope (1 envelope proce 0 ment buildings No.. ss) Request for Bids - AFCA2-01 / Supply and instal A. Ger Area Particulate Matt Single Stage - One E Small Works SPD 2022-12-3 lation of geothermal heat pu IDA / 64930 Post Request for Bids Open - National 280,000.00 0.00 Canceled 2022-05-02 2022-05-07 2022-06-13 2022-06-20 2022-07-04 er Mitigation nvelope (1 envelope proce 1 mp system for School/ or kin ss) dergarten No... National Procure AFCA3-11 / Insulation and re ment Document - A. Ger Area Particulate Matt Single Stage - One E Under Imple 2023-08-3 trofitting work for school No IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 360,000.00 0.00 2023-04-03 2023-03-29 2023-04-10 2023-05-10 2023-04-28 2023-05-17 2023-05-05 2023-05-25 er Mitigation nvelope mentation 1 57, Chingeltei district, 11 kho ss (Non Bank-SPD roo ) National Procure AFCA3-10 / Insulation and re ment Document - B. Central Ulaanbaatar Parti Single Stage - One E Under Imple 2023-08-3 trofitting work for school No3 IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 360,000.00 0.00 2023-04-03 2023-03-29 2023-04-10 2023-05-10 2023-04-28 2023-05-17 2023-05-05 2023-05-24 culate Matter Mitigation nvelope mentation 1 9, Chingeltei district, 10 khor ss (Non Bank-SPD oo ) National Procure AFB1-14 / Thermal renovatio ment Document - B. Central Ulaanbaatar Parti Single Stage - One E Pending Imp 2023-09-1 n for precast concrete apart IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 240,000.00 0.00 2023-03-30 2023-04-03 2023-05-03 2023-05-10 2023-05-17 culate Matter Mitigation nvelope lementation 5 ment buildings No ..., .... distr ss (Non Bank-SPD ict, ... khoroo ) National Procure AFBW1-01 / Construction of A. Ger Area Particulate Matt Single Stage - One E ment Document - 2023-09-1 Greening facilities, Chingeltei IDA / 64930 Post Request for Bids Open - National 280,000.00 0.00 Canceled 2023-03-30 2023-04-03 2023-05-03 2023-05-10 2023-05-17 er Mitigation nvelope 1 Envelope proce 5 district, ss (Non Bank-SPD ) National Procure AFCA3-15 / Insulation and re ment Document - A. Ger Area Particulate Matt Single Stage - One E Pending Imp 2023-08-3 trofitting work for kindergart IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 265,000.00 0.00 2023-04-03 2023-04-10 2023-05-10 2023-05-17 2023-05-24 er Mitigation nvelope lementation 1 en No85, Bayanzurkh district, ss (Non Bank-SPD 14 khoroo ) National Procure AFB1-10 / Thermal renovatio ment Document - n for precast concrete apart B. Central Ulaanbaatar Parti Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 245,000.00 0.00 2023-03-30 2023-04-03 2023-05-03 2023-05-10 2023-05-17 ment buildings No 4, Songino culate Matter Mitigation nvelope lementation 5 ss (Non Bank-SPD khairkhan district, 20 khoroo ) National Procure AFB1-13 / Thermal renovatio ment Document - n for precast concrete apart B. Central Ulaanbaatar Parti Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 360,000.00 0.00 2023-03-30 2023-04-03 2023-05-03 2023-05-10 2023-05-17 ment buildings No 23V and 2 culate Matter Mitigation nvelope lementation 5 ss (Non Bank-SPD 3G, Songinokhairkhan district ) , 29 khoroo National Procure AFB1-11 / Thermal renovatio ment Document - n for precast concrete apart B. Central Ulaanbaatar Parti Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 246,000.00 0.00 2023-03-30 2023-04-03 2023-05-03 2023-05-10 2023-05-17 ment buildings No 3, Bayang culate Matter Mitigation nvelope lementation 5 ss (Non Bank-SPD ol district, 13 khoroo ) National Procure AFCA3-12 / Insulation and re ment Document - A. Ger Area Particulate Matt Single Stage - One E Under Imple 2023-08-3 trofitting work for kindergart IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 265,000.00 0.00 2023-04-03 2023-03-27 2023-04-10 2023-05-10 2023-04-28 2023-05-17 2023-05-24 er Mitigation nvelope mentation 1 en No 97, Bayangol district, 7 ss (Non Bank-SPD khoroo ) National Procure AFCA3-13 / Insulation and re ment Document - A. Ger Area Particulate Matt Single Stage - One E Pending Imp 2023-08-3 trofitting work for kindergart IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 265,000.00 0.00 2023-04-03 2023-04-10 2023-05-10 2023-05-17 2023-05-24 er Mitigation nvelope lementation 1 en No 151, Nalaikh district, 1 ss (Non Bank-SPD khoroo ) National Procure AFB1-12 / Thermal renovatio ment Document - n for precast concrete apart B. Central Ulaanbaatar Parti Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 360,000.00 0.00 2023-03-30 2023-04-03 2023-05-03 2023-05-10 2023-05-17 ment buildings No 23A and 2 culate Matter Mitigation nvelope lementation 5 ss (Non Bank-SPD 3B, Songinokhairkhan district ) , 29 khoroo Page 2 National Procure AFCA3-14 / Insulation and re ment Document - A. Ger Area Particulate Matt Single Stage - One E Pending Imp 2023-08-3 trofitting work for kindergart IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 265,000.00 0.00 2023-04-03 2023-04-10 2023-05-10 2023-05-17 2023-05-24 er Mitigation nvelope lementation 1 en No169, Bayanzurkh distric ss (Non Bank-SPD t, 32 khoroo ) National Procure AFA2-07 / Dismantling of HO ment Document - A. Ger Area Particulate Matt Single Stage - One E Pending Imp 2023-09-1 B's and connection to district IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 310,000.00 0.00 2023-03-30 2023-04-03 2023-05-03 2023-05-10 2023-05-17 er Mitigation nvelope lementation 5 heating network ss (Non Bank-SPD ) National Procure AFB1-09 / Thermal renovatio ment Document - n for precast concrete apart B. Central Ulaanbaatar Parti Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 245,000.00 0.00 2023-03-30 2023-04-03 2023-05-01 2023-05-08 2023-05-15 ment buildings No 3, Songino culate Matter Mitigation nvelope lementation 5 ss (Non Bank-SPD khairkhan district, 20 khoroo ) National Procure AFH1 / Thermal Renovation f ment Document - A. Ger Area Particulate Matt Single Stage - One E Pending Imp 2023-10-0 or the public hospital “Nation IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 308,425.00 0.00 2023-05-15 2023-05-20 2023-06-19 2023-06-26 2023-07-05 er Mitigation nvelope lementation 1 al Center for Mental Health” ss (Non Bank-SPD ) National Procure AFCA3-16 / Insulation and re ment Document - A. Ger Area Particulate Matt Single Stage - One E Pending Imp 2023-10-0 trofitting work for school No IDA / 64930 Post Request for Bids Open - National 1 Envelope proce 292,089.00 0.00 2023-06-01 2023-06-05 2023-07-05 2023-07-10 2023-07-20 er Mitigation nvelope lementation 1 77 Bayanzurkh district, 8 kho ss (Non Bank-SPD roo ) AFB1-14-1 / Thermal renovat Request for Quota ion for precast concrete apar B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 199,464.00 0.00 2023-06-19 2023-07-18 tment building #2D, 13 khor culate Matter Mitigation tions nvelope lementation 9 PD) oo, Bayangol district, Ulaanb aatar AFB1-15 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 159,118.00 0.00 2023-06-19 2023-07-18 ment building #16, 5 khoroo, culate Matter Mitigation tions nvelope lementation 8 PD) Chingeltei district, Ulaanbaat ar AFB1-16 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 153,988.00 0.00 2023-06-19 2023-07-18 ment building #17, 5 khoroo, culate Matter Mitigation tions nvelope lementation 8 PD) Chingeltei district, Ulaanbaat ar AFB1-17 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 150,107.00 0.00 2023-06-19 2023-07-18 ment building #18, 5 khoroo, culate Matter Mitigation tions nvelope lementation 8 PD) Chingeltei district, Ulaanbaat ar AFB1-18 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 100,465.00 0.00 2023-06-19 2023-07-18 ment building #7A, 19 khoro culate Matter Mitigation tions nvelope lementation 8 PD) o, Songinokhairkhan district, Ulaanbaatar AFB1-19 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 94,874.00 0.00 2023-06-19 2023-07-18 ment building #7B, 19 khoro culate Matter Mitigation tions nvelope lementation 8 PD) o, Songinokhairkhan district, Ulaanbaatar AFB1-20 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 101,049.00 0.00 2023-06-19 2023-07-18 ment building #7V, 19 khoro culate Matter Mitigation tions nvelope lementation 8 PD) o, Songinokhairkhan district, Ulaanbaatar AFB1-21 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 191,434.00 0.00 2023-06-19 2023-07-18 ment building #8A, 19 khoro culate Matter Mitigation tions nvelope lementation 8 PD) o, Songinokhairkhan district, Ulaanbaatar AFB1-22 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 140,446.00 0.00 Canceled 2023-06-19 2023-07-18 ment building #24, 6 khoroo, culate Matter Mitigation tions nvelope 8 PD) Chingeltei district, Ulaanbaat ar AFB1-23 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 137,433.00 0.00 2023-06-19 2023-07-18 ment building #25, 6 khoroo, culate Matter Mitigation tions nvelope lementation 8 PD) Chingeltei district, Ulaanbaat ar AFB1-24 / Thermal renovatio Request for Quota n for precast concrete apart B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 120,000.00 0.00 2023-06-19 2023-07-18 ment building #14, 18 khoro culate Matter Mitigation tions nvelope lementation 8 PD) o, Songinokhairkhan district, Ulaanbaatar AFB1-25 / Insulation and retr Request for Quota ofitting work for Educational B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-09-1 IDA / 64930 Post Limited tions (Non Bank-S 70,425.00 0.00 2023-06-19 2023-07-18 complex for Children/ "Youth culate Matter Mitigation tions nvelope lementation 8 PD) center"/, 8 khoroo, Bayanzur kh distrcit, Ulaanbaatar AFBW1-02 / Construction of Request for Quota B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-10-0 Greening facilities for the Nat IDA / 64930 Post Limited tions (Non Bank-S 182,663.00 0.00 2023-06-21 2023-07-24 culate Matter Mitigation tions nvelope lementation 1 ional Federation for the Blind PD) AFBW1-03 / Construction of Request for Quota Green facilities for the "Moun B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-10-0 IDA / 64930 Post Limited tions (Non Bank-S 189,053.00 0.00 2023-06-21 2023-07-24 tain Fitness" area, 17 khoroo, culate Matter Mitigation tions nvelope lementation 1 PD) Chingeltei district, Ulaanbaat ar AFB1-22-1 / Thermal renovat Request for Quota B. Central Ulaanbaatar Parti Request for Quota Single Stage - One E Pending Imp 2023-10-0 ion for concrete apartment N IDA / 64930 Post Limited tions (Non Bank-S 162,000.00 0.00 2023-06-28 2023-08-01 culate Matter Mitigation tions nvelope lementation 1 o 16, 1 khoroo, Baganuur dis PD) trict, Ulaanbaatar WPLT-01-B / Small works for A. Ger Area Particulate Matt Single Stage - One E 2015-07-1 Green Demonstration Project IDA / 50390 Prior Request for Bids Open - National 153,000.00 113,568.29 Signed 2014-08-22 2014-10-13 2015-01-14 2015-01-27 2015-02-24 2015-02-25 er Mitigation nvelope 0 at Tasgan Ovoo, Ulaanbaatar Mongolia WPLT-01-A / Small Works for A. Ger Area Particulate Matt Single Stage - One E Green Demonstration Project IDA / 50390 Prior Request for Bids Open - National 227,000.00 163,740.77 Signed 2015-01-20 2015-03-11 2015-04-14 2015-04-30 er Mitigation nvelope at Tasgan Ovoo, Lot1 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 AFD2-01 / Supply, installatio D. Electricity for heating in t Open - Internationa Single Stage - One E n & after sales service of ETS IDA / 64930 Prior Request for Bids 990,000.00 780,612.00 Completed 2020-08-01 2020-07-27 2020-08-06 2020-07-28 2020-12-15 2020-09-16 2021-01-14 2020-10-06 2021-02-18 2020-10-23 2022-02-18 2022-03-17 argeted ger areas l nvelope heaters and accessary equip ment for rollout AFA3 / Supply of tools and e quipment for the MUB inspec A. Ger Area Particulate Matt Single Stage - One E IDA / 64930 Post Request for Bids Open - National 200,000.00 90,735.05 Completed 2020-08-03 2020-09-03 2020-08-08 2020-09-19 2020-10-02 2020-10-19 2020-10-12 2020-11-23 2020-10-23 2021-05-22 2021-01-16 tion agency for air quality me er Mitigation nvelope asurement and enforcement of new stove standard AFA3-01 / Supply of air quali A. Ger Area Particulate Matt Single Stage - One E ty monitoring stations for MU IDA / 64930 Post Request for Bids Open - National 750,000.00 508,554.41 Completed 2021-02-01 2021-05-13 2021-02-06 2021-03-08 2021-06-18 2021-03-12 2021-07-19 2021-04-01 2021-08-03 2021-06-30 2022-03-18 er Mitigation nvelope B and after sales service /2 s ets/ NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual D. Electricity for heating in t Consultant Qualifi AFD4 / ETS M&E IDA / 64930 Post Open - National 100,000.00 109,149.19 Signed 2020-07-06 2020-07-30 2020-07-17 2020-08-09 2020-08-16 2020-08-25 2020-08-30 2020-08-27 2020-09-24 2020-09-01 2021-09-24 argeted ger areas cation Selection AFA1 / Consulting service (d A. Ger Area Particulate Matt Consultant Qualifi etailed design of HOB rid-off IDA / 64930 Post Open - National 100,000.00 0.00 Canceled 2020-06-15 2020-07-06 2020-08-19 2020-09-18 2020-10-23 2021-04-21 er Mitigation cation Selection and connection to district he ating network) AFCA6 / PR and awareness a nd training activities on zero A. Ger Area Particulate Matt Consultant Qualifi IDA / 64930 Post Open - National 80,000.00 89,818.26 Completed 2020-08-10 2020-08-18 2020-08-13 2020-08-30 2020-09-14 2020-08-31 2020-09-23 2020-09-02 2020-09-26 2021-12-02 2022-03-16 carbon & green technology ( er Mitigation cation Selection activity 6 of complementary activities) AFCA5-01 / Study and Desig C. Public Awareness Raising, n of Pilot project for thermal r Consultant Qualifi IDA / 64930 Program Coordination and Pr Post Open - National 70,000.00 41,926.12 Signed 2021-02-19 2021-02-23 2021-03-05 2021-03-15 2021-03-24 2021-03-21 2021-05-18 2021-03-26 2021-05-20 2021-06-30 enovation of precast concret cation Selection oject Management e multiapartment buildings / 2 blocks/ AFA1-02 / Detailed design of A. Ger Area Particulate Matt Consultant Qualifi HOB (dismantling and conne IDA / 64930 Post Open - National 20,000.00 17,331.53 Completed 2021-06-16 2021-06-14 2021-06-29 2021-07-05 2021-07-22 2021-07-09 2021-07-30 2021-07-19 2021-08-03 2021-12-31 2021-10-01 er Mitigation cation Selection ction to district heating netw ork) AFA1-03 / Detailed design of A. Ger Area Particulate Matt Consultant Qualifi HOB dismantling and connec IDA / 64930 Post Open - National 30,000.00 13,770.77 Completed 2022-02-01 2022-05-30 2022-02-15 2022-03-04 2022-06-10 2022-03-16 2022-06-17 2022-03-23 2022-06-30 2022-05-31 2022-11-03 er Mitigation cation Selection tion to district heating netwo rk AFBC1 / Establishment of Gr B. Central Ulaanbaatar Parti Consultant Qualifi Pending Impleme IDA / 64930 Post Open - National 10,000.00 0.00 2022-02-01 2022-02-13 2022-02-24 2022-02-28 2022-03-01 2022-05-02 een facilities culate Matter Mitigation cation Selection ntation AFA1-01 / Detailed design of A. Ger Area Particulate Matt Consultant Qualifi HOB rid-off and connection t IDA / 64930 Post Open - National 100,000.00 0.00 Canceled 2021-02-15 2021-02-25 2021-03-09 2021-03-14 2021-03-23 2021-06-30 er Mitigation cation Selection o district heating network /in two locations/ AFA1-04 / Detailed design of A. Ger Area Particulate Matt Consultant Qualifi HOB rid-off and connection t IDA / 64930 Post Open - National 16,500.00 0.00 Canceled 2023-02-01 2023-02-15 2023-02-17 2023-02-28 2023-03-07 2023-04-21 er Mitigation cation Selection o district heating network AFAC-1 / Consulting service f or the development of geoth A. Ger Area Particulate Matt Consultant Qualifi Under Implement IDA / 64930 Post Open - National 17,500.00 0.00 2023-01-23 2023-01-23 2023-02-06 2023-02-10 2023-02-17 2023-02-24 2023-10-01 ermal heat pump system sta er Mitigation cation Selection ation ndards and general technical requirements AFCA6-01 / PR awareness pr C. Public Awareness Raising, Consultant Qualifi Under Implement ogram for Ulaanbaatar Clean IDA / 64930 Program Coordination and Pr Post Open - National 50,000.00 0.00 2023-03-01 2023-04-26 2023-03-15 2023-03-20 2023-04-03 2023-04-10 2023-12-31 cation Selection ation air project activities oject Management AFCC1 / Consulting service f C. Public Awareness Raising, Consultant Qualifi Under Implement or the preparation for ICR for IDA / 64930 Program Coordination and Pr Post Open - National 60,000.00 0.00 2023-04-03 2023-01-23 2023-04-17 2023-04-21 2023-05-01 2023-05-08 2023-12-24 cation Selection ation both phases of UBCAP oject Management AFAC1 / Detailed design for A. Ger Area Particulate Matt Consultant Qualifi Geothermal heat pump const IDA / 64930 Post Open - National 20,000.00 0.00 Canceled 2022-02-01 2022-02-13 2022-02-20 2022-02-25 2022-03-02 2022-04-01 er Mitigation cation Selection ruction work AFBC2 / Seismic resistance a B. Central Ulaanbaatar Parti Consultant Qualifi nalyze for precast concrete a IDA / 64930 Post Open - National 8,000.00 0.00 Canceled 2022-03-01 2022-03-15 2022-03-21 2022-03-31 2022-04-05 2022-06-05 culate Matter Mitigation cation Selection partment buildings to be ren ovated. SWHB-01 // IDA 5039-MN / S A. Ger Area Particulate Matt Consultant Qualifi Open - Internationa MALL WATER HEATING BOILE IDA / 50390 Prior 180,000.00 80,409.73 Signed 2014-01-13 2014-02-27 2014-03-21 2014-03-26 2014-04-04 2014-04-05 2014-03-21 er Mitigation cation Selection l R MARKET STUDY CPLG-01 / CONSULTING SER VICE FOR PREPARATION OF F A. Ger Area Particulate Matt Quality And Cost- Open - Internationa IDA / 50390 Prior 421,312.00 14,920.00 Signed 2015-06-11 2015-06-13 EASIBILITY STUDY OF A CITY er Mitigation Based Selection l GREENING INVESTMENT OF U LAANBAATAR Audit Services / Project Fina A. Ger Area Particulate Matt Consultant Qualifi Open - Internationa IDA / 50390 Prior 5,900,000.00 5,692.73 Signed 2014-10-22 2014-07-18 ncial Audit er Mitigation cation Selection l INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AFCPIU-01 / Selection of Indi A. Ger Area Particulate Matt Individual Consult vidual Consultant to Support IDA / 64930 Post Direct 27,940.00 27,718.45 Completed 2020-06-15 2020-05-26 2020-06-25 2020-05-26 2020-07-16 2020-08-20 2020-06-09 2021-02-16 2022-02-02 er Mitigation ant Selection PIU on implementation of pro ject Page 4 C. Public Awareness Raising, Pending Impleme AFC3 / Audit service IDA / 64930 Program Coordination and Pr Post Direct Selection Direct 15,000.00 0.00 2021-01-04 2021-01-14 2021-03-20 2021-05-04 ntation oject Management AFD1 / Preparation of techni D. Electricity for heating in t Individual Consult IDA / 64930 Post Limited 50,000.00 18,232.76 Completed 2020-06-22 2020-06-22 2020-06-27 2020-06-22 2020-07-18 2020-07-01 2020-08-22 2020-07-02 2021-02-18 2021-05-12 cal specification and BOQ for argeted ger areas ant Selection ETS SCSU-01 / Survey on househ A. Ger Area Particulate Matt IDA / 50390 Prior Direct Selection Direct 20,000.00 18,937.74 Signed 2017-12-23 old heating appliances er Mitigation HSAP-01 / INTERVENTION ST UDY FOR IMPROVEMENT OF A. Ger Area Particulate Matt IDA / 50390 Prior Direct Selection Direct 25,000.00 22,443.45 Signed 2016-02-20 AIR QUALITY IN KINDERGART er Mitigation ENS IN GER AREA OF ULAAN BAATAR CITY C-5039-MN//KLTA-01 / CERA A. Ger Area Particulate Matt IDA / 50390 Prior Direct Selection Direct 70,000.00 96,000.00 Signed 2017-06-13 MIC LINING TECHNICAL ASSIS er Mitigation TANCE CSMST-01 / Clean Stove Sale A. Ger Area Particulate Matt s, Monitoring and Subsidy Tr IDA / 50390 Prior Direct Selection Direct 40,000.00 17,457.43 Signed 2015-03-19 2015-04-16 er Mitigation ansfer Service Page 5 PROCUREMENT PLAN Project information: Democratic Republic of Congo – DRC COVID-19 STRATEGIC PREPAREDNESS AND RESPONSE PROJECT (SPRP)(P17382) Project Implementation agency: Ministry of Public Health – PDSS Date of the Procurement Plan: March 2020 Period covered by this Procurement Plan : March 2020 – Sept 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the DRC Procurement code of April 27, 2010, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. (a) Standard Bidding Documents. All Standard Bidding Documents to be used for the project under NCB shall be found acceptable to the World Bank before their use during the implementation of the project. (b) Eligibility. Eligibility of bidders and acceptability of their goods and services shall not be based on their nationality and/or their origin, and association with a national firm shall not be a condition for participation in a bidding process. Therefore, except for the ineligibility situations referred to in paragraphs 1.10(a) (i) and 1.10(a) (ii) of the Procurement Guidelines, the eligibility of bidders must be based solely on their qualification, experience, and capacity to carry out the contract related to the specific bidding process. (c) Advertising and bid preparation time. Bidding opportunities shall be advertised at least in a national newspaper of wide circulation and on the website of the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics), and bidders should be given at least 30 days from the date of invitation to bid or the date of availability of the bidding documents, whichever is later. (d) Criteria for qualification of bidders. Qualification criteria shall only concern the bidder’s capability and resources to perform the contract, taking into account objective and measurable factors. Such criteria for qualification of bidders shall be clearly specified in the bidding documents. (e) Evaluation and contract award. A contract shall be awarded to the substantially responsive and lowest evaluated bidder provided that such bidder meets the qualification criteria specified in the bidding documents. No scoring system shall be allowed for the evaluation of bids, and no ‘blanket’ limitation to the number of lots which can be awarded to a bidder shall apply. The criteria for bid evaluation and the contract award conditions shall be clearly specified in the bidding documents; (f) Preferences. No preference shall be given to domestic/regional bidders, to domestically/regionally manufactured goods, and to bidders forming a joint venture with a national firm or proposing national subcontractors or carrying out economic activities in the territory of the recipient. (g) Publication of contract award. Information on all contract awards shall be published in at least a national newspaper of wide circulation or in the Recipient’s Procurement Regulator (Autorité de Régulation des Marchés Publics) website. (h) Fraud and corruption. In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy to sanction firms or individuals found to have engaged in fraud and corruption as set forth in the Procurement Guidelines. (i) Inspection and audit rights. In accordance with the Procurement Guidelines, each bidding document and contract shall include provisions stating the World Bank’s policy with respect to inspection and audit of accounts, records, and other documents relating to the bid submission and contract performance. (j) Requirement for administrative documents and/or tax clearance certificate. The bidding documents shall not require foreign bidders to produce any administrative or tax-related certificates before confirmation of awarding a contract. (k) Modifications of a signed contract. Any change in the contract amount which, singly or combined with all previous changes, increases the original contract amount by 15 percent or more must be done through an amendment to the signed contract instead of signing a new contract. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable Works: is not applicable PROCUREMENT Congo, Democratic Republic of : DRC COVID-19 Strategic Preparedness and Response Project (SPRP) PLAN General Information Country: Congo, Democratic Republic of 2020-04-03 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173825 GPN Date: 2020-11-16 Project Name: DRC COVID-19 Strategic Preparedness and Response Project (SPRP) Loan / Credit No: IDA / 66010, / , IDA / D6020, IDA / 69620 RDC-MINISTERE DE LA SANTE PUBLIQUE Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ZR-DRC-MSP-208738-CW-RF Component 1: Emergency C Q / réhabilitation du Bureau d OVID-19 Response, National Request for Quota Single Stage - One E 2021-08-1 IDA / D6020 Post Limited 50,000.00 0.00 Canceled 2020-12-26 2021-02-20 u Secrétaire Général du Minis and Sub-national Prevention tions nvelope 9 tère de la Santé Publique and Preparedness ZR-DRC-MSP-362485-CW-RF Q / REALISATION DE TRAVAU Component 2: Communicati Request for Quota X DE FORAGE AUX CLINIQUE on campaign, Community En Request for Quota Single Stage - One E tions - Small Work Pending Imp 2024-03-1 S UNIVERSITAIRES DE KISAN IDA / 69620 Post Limited 100,000.00 0.00 2023-07-25 2023-09-19 gagement and Behavior cha tions nvelope s (Emergency) SP lementation 7 GANI (Ø 2 forages d’eau , Ø 1 nge D -Competitive Ø château d’eau +connexi on au circuit des Cliniques U niversitaires de Kisangani ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-DRC-MSP-166438-GO-RF Q / Réhabiliter les structures Component 1: Emergency C de soins ciblées à Kinshasa e OVID-19 Response, National Request for Quota Single Stage - One E / Post Limited 1,509,330.00 0.00 Canceled 2020-04-06 2020-06-01 2020-11-28 t en Provinces en matériels e and Sub-national Prevention tions nvelope t équipements (Lits, Bulles, O and Preparedness xymètres, Thermoflash, Gluc omètres) ZR-DRC-MSP-166439-GO-DI Component 1: Emergency C R / Doter les structures cliblé OVID-19 Response, National / Prior Direct Selection Direct 7,500,000.00 0.00 Canceled 2020-04-01 2020-04-06 2020-05-11 2020-11-07 es Kinshasa + provinces en K and Sub-national Prevention its de médicaments (MES-CO and Preparedness VID-19) ZR-DRC-MSP-166443-GO-DI R / Doter l''INRB en Kits basiq Component 1: Emergency C ues de réactifs et consomma OVID-19 Response, National bles de diagnostic, en équipe / Prior Direct Selection Direct 1,932,180.00 0.00 Canceled 2020-04-01 2020-04-06 2020-05-11 2020-11-07 and Sub-national Prevention ments et intrants de diagnost and Preparedness ic de Covid-18 et en équipem ents, consommables et réacti fs. ZR-DRC-MSP-166446-GO-RF Component 1: Emergency C Q / Doter les PoE en caméras OVID-19 Response, National Request for Quota Single Stage - One E thermiques, en Thermoflash, / Post Limited 712,400.00 0.00 Canceled 2020-04-06 2020-06-01 2020-11-28 and Sub-national Prevention tions nvelope en tablettes et Approvisionne and Preparedness r en intrants (oxygène)-Kin [ Conentrateurs d'oxygène] Component 1: Emergency C ZR-DRC-MSP-166454-GO-DI OVID-19 Response, National R / Renforcer les mesures de / Post Direct Selection Direct 250,000.00 0.00 Canceled 2020-04-01 2020-04-06 2020-05-11 2020-11-07 and Sub-national Prevention biosécurité and Preparedness ZR-DRC-MSP-166461-GO-DI Component 1: Emergency C R / Produire des solutions hy OVID-19 Response, National / Prior Direct Selection Direct 1,800,000.00 0.00 Canceled 2020-04-01 2020-04-06 2020-05-11 2020-11-07 droalcoolique et de l'eau de j and Sub-national Prevention avel and Preparedness ZR-DRC-MSP-166462-GO-RF Component 1: Emergency C Q / Doter les outils de surveill OVID-19 Response, National Request for Quota Single Stage - One E / Post Limited 80,000.00 0.00 Canceled 2020-04-06 2020-06-01 2020-11-28 ance (environ 80000 fiches s and Sub-national Prevention tions nvelope anitaire de voyageurs par jou and Preparedness r) ZR-DRC-MSP-174597-GO-DI R / Contractualisation en Ent ente Directe avec la Société Component 1: Emergency C PRODIMPEX S.A. basée à Kin OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 116,250.00 112,500.00 Completed 2020-05-20 2020-05-20 2020-05-25 2020-05-20 2020-06-29 2020-05-23 2020-12-26 2020-05-23 shasa pour la fourniture et liv and Sub-national Prevention raison en urgence de Trente and Preparedness (30) Motos YAMAHA DT 125 e t des Casques de protection pour la riposte contre le COVI D-19 ZR-DRC-MSP-174615-GO-RF Component 1: Emergency C Q / Fourniture en urgence d’é OVID-19 Response, National Request for Quota Single Stage - One E quipements, matériels, dispo IDA / D6020 Prior Limited 7,300,224.00 0.00 Canceled 2020-05-25 2020-07-20 2021-01-16 and Sub-national Prevention tions nvelope sitifs médicaux et consomma and Preparedness bles pour la riposte contre C OVID-19 ZR-DRC-MSP-180176-GO-RF Component 1: Emergency C Q / Acquisition des Glucomèt OVID-19 Response, National Request for Quota Single Stage - One E res, Boîtes de Bandettes Gluc IDA / D6020 Post Limited 28,000.00 28,000.00 Completed 2020-06-29 2020-06-11 2020-08-24 2020-07-16 2021-02-20 2020-07-18 and Sub-national Prevention tions nvelope osides, Boîtes de Lancettes s and Preparedness tériles et Saturomètres ZR-DRC-MSP-184863-GO-RF Component 1: Emergency C Q / Acquisition des matériels OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Post Limited 36,000.00 28,184.00 Completed 2020-07-25 2020-08-05 2020-09-19 2020-10-22 2021-03-18 2021-05-06 et équipements informatique and Sub-national Prevention tions nvelope s en faveur des Zones de San and Preparedness té de Kinshasa ZR-DRC-MSP-184864-GO-RF Component 1: Emergency C Q / Fournitures des matériels OVID-19 Response, National Request for Quota Single Stage - One E et consommables de bureau IDA / D6020 Post Limited 4,803.00 5,976.35 Completed 2020-07-25 2020-07-29 2020-09-19 2020-08-18 2021-03-18 2020-08-21 and Sub-national Prevention tions nvelope pour les commissions et le S and Preparedness ecrétariat Technique de la Ri poste COVID-19 Page 1 ZR-DRC-MSP-184866-GO-RF Component 1: Emergency C Q / Acquisition de Dix (10) vé OVID-19 Response, National Request for Quota Single Stage - One E hicules de terrain 4x4 pour 1 IDA / D6020 Post Limited 500,000.00 428,560.00 Completed 2020-07-27 2020-08-04 2020-09-21 2020-10-29 2021-03-20 2021-02-24 and Sub-national Prevention tions nvelope 0 Zones de santé de Kinshas and Preparedness a en appui à la Riposte COVI D-19 ZR-DRC-MSP-184867-GO-RF Component 1: Emergency C Q / Acquisition en urgence de OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Post Limited 384,600.00 421,000.00 Completed 2020-07-26 2020-07-28 2020-09-20 2020-09-03 2021-03-19 2020-09-13 s intrants de laboratoire COD and Sub-national Prevention tions nvelope IV-19 de l’INRB, and Preparedness ZR-DRC-MSP-185818-GO-RF Component 1: Emergency C Q / Acquisition des médicam OVID-19 Response, National Request for Quota Single Stage - One E ents pour traitement des Co IDA / 66010 Prior Limited 3,000,000.00 2,396,182.40 Signed 2020-07-31 2020-10-27 2020-09-25 2020-12-15 2021-03-24 and Sub-national Prevention tions nvelope morbidités dans le cadre de l and Preparedness a riposte contre le COVID-19 ZR-DRC-MSP-174600-CS-CD S-2 / Contractualisation par e Component 1: Emergency C ntente directe avec UNICEF p OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 1,112,964.00 1,112,964.00 Signed 2020-09-08 2020-09-25 2020-09-13 2020-09-28 2020-10-18 2020-03-04 2021-04-16 our l'Appui à l'opération d'ur and Sub-national Prevention gence en réponse à l'épidémi and Preparedness e de COVID-19 en Républiqu e Démocratique du Congo ZR-DRC-MSP-204682-GO-RF Q / Fourniture en urgence de Component 1: Emergency C Douze (12) ambulances médi OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Post Limited 669,000.00 667,800.00 Completed 2020-11-18 2020-03-23 2021-01-13 2020-04-04 2021-07-12 2020-06-17 calisées, type 4x4 TOYOTA L and Sub-national Prevention tions nvelope and Cruiser HZJ78L - RKMNS and Preparedness V, pour la riposte contre le C OVID-19 ZR-DRC-MSP-210986-GO-RF Component 1: Emergency C Q / Acquisition en Trois (3) Lo OVID-19 Response, National Request for Quota Single Stage - One E ts distincts des réactifs et co IDA / D6020 Prior Limited 1,500,000.00 1,135,097.49 Signed 2021-01-25 2020-12-28 2021-03-22 2021-05-15 2021-09-18 and Sub-national Prevention tions nvelope nsommables de Laboratoire and Preparedness pour les analyses CODIV-19 ZR-DRC-MSP-216658-GO-RF Component 1: Emergency C Q / Fourniture de 300.000 Te OVID-19 Response, National Request for Quota Single Stage - One E IDA / 66010 Prior Limited 1,500,000.00 0.00 Canceled 2021-02-26 2021-04-23 2021-10-20 sts individuels de diagnostic and Sub-national Prevention tions nvelope rapide and Preparedness SARS-2 COVID-19 Antigène ZR-DRC-MSP-217580-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Penlon Me OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 5,119,768.00 5,119,768.00 Signed 2021-02-24 2021-02-24 2021-03-01 2021-02-24 2021-04-05 2021-02-26 2021-10-02 dical Systems pour la fournit and Sub-national Prevention ure de 400 Respirateurs d’Ur and Preparedness gence (Ventilateurs d’urgenc e ESO2 et Trolley Iso / NIST) ZR-DRC-MSP-217583-GO-DI R / Contractualisation par ent ente avec GE MEDICAL SYST Component 1: Emergency C EM pour la Fourniture des éq OVID-19 Response, National uipements médicaux Mac 60 IDA / D6020 Prior Direct Selection Direct 3,197,200.00 3,197,200.00 Completed 2021-03-01 2021-02-15 2021-03-06 2021-02-16 2021-04-10 2021-02-25 2021-10-07 2021-09-28 and Sub-national Prevention 0 ECG et Mobile X-Ray Brivo and Preparedness XR115/Definium XR120 et ac cessoires pour la réponse à l a COVID-19 en République D émocratique du Congo ZR-DRC-MSP-217586-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Mindray, M OVID-19 Response, National R Global (HK) Limited pour la IDA / D6020 Prior Direct Selection Direct 1,872,180.00 1,872,180.00 Signed 2021-03-10 2021-02-23 2021-03-15 2021-02-24 2021-04-19 2021-02-26 2021-10-16 and Sub-national Prevention Fourniture de 400 Moniteurs and Preparedness de patient, 2.400 oxymètres d’impulsion, 80 défibrillateur s/moniteur ZR-DRC-MSP-217588-GO-DI Component 1: Emergency C R / Contractualisation par ent OVID-19 Response, National ente directe avec Sinoventur IDA / D6020 Prior Direct Selection Direct 1,425,290.00 1,425,290.00 Signed 2021-03-08 2021-02-24 2021-03-13 2021-02-25 2021-04-17 2021-02-26 2021-10-14 and Sub-national Prevention e pour Fourniture de 800 Con and Preparedness centrateurs d’Oxygène CP50 1 ZR-DRC-MSP-217589-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Laerdal Me OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 633,813.00 633,813.00 Completed 2021-03-16 2021-02-23 2021-03-21 2021-02-24 2021-04-25 2021-02-25 2021-10-22 2021-09-08 dical Systems Fourniture de and Sub-national Prevention 1.600 réanimateurs réutilisab and Preparedness les pour Adulte , avec conso mmables et pièces de rechan ge ZR-DRC-MSP-218883-GO-DI R / Contractualisation par ent ente directe avec l'Etablisse Component 1: Emergency C ment PHATKIN pour la finalis OVID-19 Response, National ation des prestations non ach IDA / 66010 Prior Direct Selection Direct 1,500,000.00 484,872.37 Signed 2021-03-23 2021-04-16 2021-03-28 2021-10-27 2021-05-02 2021-07-31 2021-10-29 and Sub-national Prevention evées du contrat initial et Ac and Preparedness heminement et distribution d es médicaments et consomm ables médicaux dans les FOS A des Provinces affectées po ur ZR-DRC-MSP-225927-GO-RF Component 1: Emergency C Q / Acquisition des thermos fl OVID-19 Response, National Request for Quota Single Stage - One E ash et caméras thermiques p IDA / D6020 Post Limited 180,000.00 113,000.00 Signed 2021-04-04 2021-07-05 2021-05-30 2021-09-30 2021-11-26 and Sub-national Prevention tions nvelope our le compte du secrétariat and Preparedness technique de la Riposte contr e COVID-19 ZR-DRC-MSP-227059-GO-DI R / Contractualisation en Ent Component 1: Emergency C ente Directe avec la SOGEQ OVID-19 Response, National Sarl pour la fourniture de 16 IDA / D6020 Post Direct Selection Direct 255,000.00 255,000.00 Signed 2021-04-20 2021-04-01 2021-04-25 2021-04-16 2021-05-30 2021-04-20 2021-11-26 and Sub-national Prevention 00 litres d’Hélium liquide pou and Preparedness r l’appareil d’IRM de la Cliniq ue Ngaliema , son remplissag e dans la cage de l’aimant et la ZR-DRC-MSP-229646-GO-RF Component 1: Emergency C Q / Fourniture de 300.000 Te OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Prior Limited 1,500,000.00 1,856,250.00 Signed 2021-05-03 2021-06-13 2021-06-28 2021-04-24 2021-12-25 sts individuels de diagnostic and Sub-national Prevention tions nvelope rapide SARS-2 COVID-19 Anti and Preparedness gène. ZR-DRC-MSP-234183-GO-DI R / Contractualisation par ent ente avec GE MEDICAL SYST Component 1: Emergency C EM pour la Fourniture des éq OVID-19 Response, National uipements médicaux Mac 60 IDA / D6020 Prior Direct Selection Direct 3,197,200.00 3,276,930.00 Signed 2021-05-31 2021-08-11 2021-06-05 2021-08-25 2021-07-10 2021-02-25 2022-01-06 and Sub-national Prevention 0 ECG et Mobile X-Ray Brivo and Preparedness XR115 / Definium XR120 et a ccessoires pour la réponse à la COVID-19 en République D émocratique du Congo Page 2 ZR-DRC-MSP-234184-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Laerdal Me OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 633,813.00 633,813.00 Signed 2021-05-31 2021-02-12 2021-06-05 2021-02-12 2021-07-10 2021-01-02 2022-01-06 dical Systems Fourniture de and Sub-national Prevention 1.600 réanimateurs réutilisab and Preparedness les pour Adulte, avec consom mables et pièces de rechang e ZR-DRC-MSP-234185-GO-DI Component 1: Emergency C R / Contractualisation par ent OVID-19 Response, National ente directe avec Sinoventur IDA / D6020 Post Direct Selection Direct 1,425,290.00 1,441,290.00 Completed 2021-05-31 2021-02-12 2021-06-05 2021-02-12 2021-07-10 2021-01-02 2022-01-06 2022-04-27 and Sub-national Prevention e pour Fourniture de 800 Con and Preparedness centrateurs d'Oxygène CP50 1 ZR-DRC-MSP-234186-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Mindray, M OVID-19 Response, National R Global (HK) Limited pour la IDA / D6020 Prior Direct Selection Direct 1,872,180.00 1,872,180.00 Completed 2021-05-31 2021-08-11 2021-06-05 2021-08-25 2021-07-10 2021-02-26 2022-01-06 2021-06-26 and Sub-national Prevention fourniture de 400 moniteurs and Preparedness de patient, 2.400 oxymètres d'impulsion, 80 défibrillateur s / moniteur ZR-DRC-MSP-234188-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Penlon Me OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 5,119,768.00 5,119,768.00 Signed 2021-05-31 2021-08-11 2021-06-05 2021-08-25 2021-07-10 2021-02-26 2022-01-06 dical Systems pour la fournit and Sub-national Prevention ure de 400 Respirateurs d'Ur and Preparedness gence (Ventilateurs d'urgenc e ESO2 et Trolley Iso / NIST) ZR-DRC-MSP-234192-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Hilrom pou OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 1,172,432.00 1,145,412.00 Completed 2021-05-31 2021-02-23 2021-06-05 2021-02-23 2021-07-10 2021-05-01 2022-01-06 2021-08-17 r la fourniture de 400 lits de r and Sub-national Prevention éanimation dans le cadre du and Preparedness BFP (Livraison par voie mariti me) ZR-DRC-MSP-234193-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Hilrom pou OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 234,805.00 127,136.00 Completed 2021-05-31 2021-02-23 2021-06-05 2021-02-23 2021-07-10 2021-05-01 2022-01-06 2021-08-17 r la fourniture de 200 otosco and Sub-national Prevention pes et 400 laryngoscopes da and Preparedness ns le cadre du BFP (livraison par voie aérienne) ZR-DRC-MSP-234194-GO-DI Component 1: Emergency C R / Contractualisation par ent OVID-19 Response, National ente directe avec Medtronix IDA / D6020 Post Direct Selection Direct 760,000.00 595,850.00 Signed 2021-05-31 2021-02-23 2021-06-05 2021-02-23 2021-07-10 2021-05-11 2022-01-06 and Sub-national Prevention pour la fourniture des canule and Preparedness s et masques respiratoires da ns le cadre du BFP ZR-DRC-MSP-234196-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec AutomedX OVID-19 Response, National pour la fourniture de 80 appa IDA / D6020 Post Direct Selection Direct 440,000.00 607,916.00 Signed 2021-05-31 2021-02-13 2021-06-05 2021-02-13 2021-07-10 2021-03-02 2022-01-06 and Sub-national Prevention reils de réanimation + acces and Preparedness soires, et 160 bouteilles (vide s) d'oxygène dans le cadre d u BFP. ZR-DRC-MSP-238579-GO-DI R / Contractualisation en Ent ente Directe (ED) avec la Soc Component 1: Emergency C iété Africaine de GAZ de Kins OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 100,800.00 114,800.00 Signed 2021-06-24 2021-06-07 2021-06-29 2021-06-07 2021-08-03 2021-06-08 2022-01-30 hasa, en sigle SAFGAZ, pour l and Sub-national Prevention ’approvisionnement en urgen and Preparedness ce en Oxygène médical de H uit (8) Centre de Traitement COVID-19 dans la Ville de Ki nshasa. ZR-DRC-MSP-247189-GO-RF Q / Fourniture, livraison, mon tage et installation et mise e Component 1: Emergency C n service de Huit (8) Unité de OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Prior Open - National 2,350,000.00 3,948,000.00 Signed 2021-08-23 2021-10-27 2021-10-18 2021-11-28 2022-04-16 production d'oxygène médic and Sub-national Prevention tions nvelope al pour les Formations Sanita and Preparedness ires dans la ville de Kinshasa et dans les provinces du Hau t-Katanga, Kongo Central, No rd et Sud Kivu ZR-DRC-MSP-227068-GO-RF Q / Fourniture, livraison, mon tage et installation et mise e Component 1: Emergency C n service de Huit (8) Unité de OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Prior Open - National 2,350,000.00 0.00 Canceled 2021-04-26 2021-06-21 2021-12-18 production d’oxygène médic and Sub-national Prevention tions nvelope al pour les Formations Sanita and Preparedness ires dans la ville de Kinshasa et dans les provinces du Hau t-Katanga, Kongo Central, No rd et Sud Kivu ZR-DRC-MSP-250026-GO-DI R / Contractualisation par ent Component 1: Emergency C ente Directe avec l'UNICEF p OVID-19 Response, National our la fourniture du Vaccin Jo IDA / D6020 Prior Direct Selection Direct 89,519,966.92 89,519,966.92 Signed 2021-09-29 2021-09-10 2021-10-04 2021-09-30 2021-11-08 2021-09-25 2022-05-07 and Sub-national Prevention hnson & Johnson pour le Gou and Preparedness vernement de la RDC dans le cadre du Financement additi onnel COVID-19. ZR-DRC-MSP-259234-GO-RF Q / Contractualisation par gré à gré avec la maison SHEKIN Component 2: Communicati A pour l'impression et reprod on campaign, Community En IDA / 69620 Post Direct Selection Direct 100,000.00 100,000.00 Signed 2021-11-11 2021-11-04 2021-11-16 2021-11-04 2021-12-21 2021-11-05 2022-06-19 uction de 10 000 ouvrages in gagement and Behavior cha titulé "L'essentiel sur la vacci nge nation contre la COVID-19'' d ans le cadre de l'appui au Pro gramme Elargi de Vaccinatio n ZR-DRC-MSP-267694-GO-DI Component 1: Emergency C R / Contractualisation par ent OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 43,846,345.00 43,384,654.33 Signed 2022-01-28 2022-02-01 2022-02-02 2022-03-18 2022-03-09 2022-06-10 2022-09-05 ente avec Unicef, pour l’acqu and Sub-national Prevention isition des éléments de la Ch and Preparedness aîne de froid ZR-DRC-MSP-221256-GO-DI Component 1: Emergency C R / Contractualisation par ent OVID-19 Response, National ente directe avec Medtronix IDA / D6020 Post Direct Selection Direct 760,000.00 0.00 Canceled 2021-03-25 2021-02-24 2021-03-30 2021-05-04 2021-10-31 and Sub-national Prevention pour la fourniture des canule and Preparedness s et masques respiratoires da ns le cadre du BFP ZR-DRC-MSP-221252-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec AutomedX OVID-19 Response, National pour la fourniture de 80 appa IDA / D6020 Post Direct Selection Direct 440,000.00 0.00 Canceled 2021-03-24 2021-02-24 2021-03-29 2021-04-16 2021-05-03 2021-10-30 and Sub-national Prevention reils de réanimation + acces and Preparedness soirs, et 160 bouteilles (vides ) d’oxygène dans le cadre du BFP. Page 3 ZR-DRC-MSP-221262-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Hilrom pou OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 1,172,432.00 0.00 Canceled 2021-03-25 2021-02-24 2021-03-30 2021-05-04 2021-10-31 r la fourniture de 400 lits de r and Sub-national Prevention éanimation dans le cadre du and Preparedness BFP (Livraison par voie mariti me) ZR-DRC-MSP-221260-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec Hilrom pou OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 234,805.00 0.00 Canceled 2021-03-24 2021-02-24 2021-03-29 2021-05-03 2021-10-30 r la fourniture de 200 otosco and Sub-national Prevention pes et 400 laryngoscopes da and Preparedness ns le cadre du BFP (livraison par voie aérienne) ZR-DRC-MSP-166441-GO-RF Component 1: Emergency C Q / Prépositionner les intrant OVID-19 Response, National Request for Quota Single Stage - One E / Post Limited 1,250,000.00 0.00 Canceled 2020-04-06 2020-06-01 2020-11-28 s de prévention et de prise e and Sub-national Prevention tions nvelope n charge des cas (Kit PEC) and Preparedness ZR-DRC-MSP-194297-GO-RF Component 1: Emergency C Q / Acquisition des matériels OVID-19 Response, National Request for Quota Single Stage - One E et équipements médicaux po IDA / 66010 Prior Limited 15,000,000.00 0.00 Canceled 2020-09-19 2020-11-14 2021-05-13 and Sub-national Prevention tions nvelope ur 15 formations sanitaires d and Preparedness e prise en charge des malade s Covid-19 ZR-DRC-MSP-218895-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec le Groupe OVID-19 Response, National ment DISPOMED & ASTORIA IDA / D6020 Post Direct Selection Direct 250,000.00 0.00 Canceled 2021-04-22 2021-04-27 2021-06-01 2021-11-28 and Sub-national Prevention pour l'acquisition du complé and Preparedness ment d'équipements et autre s accessoires des 2 unités de la Clinique Ngaliema. ZR-DRC-MSP-204680-GO-RF Q / Acquisition des besoins pr ioritaires composés des Masq Component 1: Emergency C ues chirurgicaux, des Tenues OVID-19 Response, National Request for Quota Single Stage - One E de protection et gants pour l IDA / D6020 Post Limited 15,000.00 0.00 Canceled 2020-11-21 2021-01-16 2021-07-15 and Sub-national Prevention tions nvelope e corps médical et des intran and Preparedness ts pour la production des sol utions hydroalcooliques et de l’eau de javel pour la riposte contre la COVID-19 ZR-DRC-MSP-303059-GO-RF Component 1: Emergency C Q / Travaux de réhabilitation OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Post Limited 37,500.00 0.00 Signed 2022-09-19 2022-09-06 2022-11-14 2023-05-13 des bureaux de la coordinati and Sub-national Prevention tions nvelope on vaccination covid au PEV and Preparedness ZR-DRC-MSP-316833-GO-RF Component 1: Emergency C Q / Acquisition de 7 véhicules OVID-19 Response, National Request for Quota Single Stage - One E 4x4 pour le niveau central ( IDA / 69620 Post Limited 490,000.00 0.00 Canceled 2022-12-04 2023-01-29 2023-07-28 and Sub-national Prevention tions nvelope CT-CMR, PEV/CNTV) et pour l and Preparedness ’UG PDSS ( Projet Covid et R EDISSE IV) ZR-DRC-MSP-219262-GO-RF Component 1: Emergency C Q / Acquisition des mobiliers OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Post Limited 18,000.00 0.00 Canceled 2021-03-31 2021-05-26 2021-11-22 pour le bureau du Secrétaire and Sub-national Prevention tions nvelope Général du Ministère de la Sa and Preparedness nté Publique ZR-DRC-MSP-218872-GO-RF Q / Acquisition et installation de sept unités complètes de Component 1: Emergency C production d'oxygène médic OVID-19 Response, National Request for Quota Single Stage - One E al pour mes Provinces de Kin IDA / D6020 Prior Open - National 2,250,000.00 0.00 Canceled 2021-03-29 2021-05-24 2021-11-20 and Sub-national Prevention tions nvelope shasa (2), Kongo-Central (1), and Preparedness Haut-Katanga (1), Nord-Kivu (1) et Sud-Kivu (2), et d'un sy stème complémentaire de re mplissage sous haute pressio n ZR-DRC-MSP-234195-GO-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec le Groupe OVID-19 Response, National ment DISPOMED & ASTORIA IDA / D6020 Post Direct Selection Direct 250,000.00 0.00 Canceled 2021-05-31 2021-06-05 2021-07-10 2022-01-06 and Sub-national Prevention pour l'acquisition du complé and Preparedness ment d'équipements et autre s accessoires des 2 unités de la Clinique Ngaliema. ZR-DRC-MSP-234453-GO-RF Component 1: Emergency C Q / Acquisition en urgence de OVID-19 Response, National Request for Quota Single Stage - One E 100 000 Tests PCR SARS-CO IDA / D6020 Prior Open - National 1,500,000.00 0.00 Canceled 2021-06-27 2021-08-22 2022-02-18 and Sub-national Prevention tions nvelope V-2 Nucleic Acid BIOER dans l and Preparedness e cadre de lutte contre la CO VID-19 ZR-DRC-MSP-218297-GO-RF Q / SELECTION D’UN PRESTA TAIRE CHARGE D’ASSURER L Component 1: Emergency C E STOCKAGE ET LA GESTION OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Post Open - National 500,000.00 0.00 Canceled 2021-04-27 2021-06-22 2021-12-19 DES MATERIELS MEDICAUX E and Sub-national Prevention tions nvelope T MEDICAMENTS ACQUIS PAR and Preparedness LE PDSS DANS LE CADRE DE L’APPUI A LA REPONSE A LA COVID-19. ZR-DRC-MSP-323321-GO-RF Component 1: Emergency C B / Acquisition de 5 véhicule OVID-19 Response, National Single Stage - One E s 4x4 : pour le niveau central IDA / 69620 Post Request for Bids Open - National 390,000.00 0.00 Signed 2022-12-27 2022-11-26 2023-01-01 2022-11-29 2023-02-12 2023-01-12 2023-03-14 2023-02-06 2023-04-18 2023-10-15 and Sub-national Prevention nvelope (CT-CMR, PEV/CNTV) (3 véhic and Preparedness ules ) et pour l’UG PDSS Proj et Covid (2 véhicules ) ZR-DRC-MSP-327528-GO-RF Component 1: Emergency C B / Acquisition et fourniture d OVID-19 Response, National Open - Internationa Single Stage - One E es médicaments essentiels a IDA / 69620 Post Request for Bids 300,000.00 0.00 Canceled 2022-12-20 2022-12-25 2023-02-05 2023-03-07 2023-04-11 2023-10-08 and Sub-national Prevention l nvelope ux CTCo de Kinshasa dans le and Preparedness cadre de la résilience post-co vid ZR-DRC-MSP-338016-GO-DI R / Contractualisation par Ent ente directe avec Africa Medi Component 1: Emergency C cal pour l'acquisition et instal OVID-19 Response, National Direct - Internation Under Imple lation de 6 usines de product IDA / 69620 Prior Direct Selection 3,360,000.00 0.00 2023-02-22 2023-03-21 2023-02-27 2023-05-30 2023-04-03 2023-09-30 and Sub-national Prevention al mentation ion d’Oxygène médicale dans and Preparedness les provinces nécessiteuses a insi que la fourniture des équ ipements anti-incendie pour 8 usines de product... Page 4 ZR-DRC-MSP-346108-GO-RF Component 1: Emergency C B / Acquisition et fourniture d OVID-19 Response, National Single Stage - One E Under Imple es médicaments essentiels a IDA / 69620 Post Request for Bids Open - National 300,000.00 0.00 2023-05-23 2023-05-04 2023-05-28 2023-05-09 2023-07-09 2023-08-08 2023-09-12 2024-03-10 and Sub-national Prevention nvelope mentation ux CTCo de Kinshasa dans le and Preparedness cadre de la résilience post-co vid ZR-DRC-MSP-328777-GO-RF Component 1: Emergency C Q / Acquisition et fourniture d OVID-19 Response, National Request for Quota Single Stage - One E es médicaments essentiels a IDA / 69620 Post Limited 300,000.00 0.00 Canceled 2022-12-26 2023-02-20 2023-08-19 and Sub-national Prevention tions nvelope ux CTCo de Kinshasa dans le and Preparedness cadre de la résilience post-co vid ZR-DRC-MSP-208736-GO-RF Component 1: Emergency C Q / Acquisition en urgence de OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Post Limited 353,250.00 0.00 Canceled 2020-12-14 2020-12-16 2021-02-08 2021-08-07 l'Oxygène pour la Division Pr and Sub-national Prevention tions nvelope ovinciale de la Santé (DPS) d and Preparedness e Kinshasa ZR-DRC-MSP-184865-GO-RF Component 1: Emergency C Q / Acquisition des réactifs et OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Prior Limited 1,500,000.00 0.00 Canceled 2020-08-11 2020-10-27 2020-10-06 2021-04-04 consommables de Laboratoir and Sub-national Prevention tions nvelope e pour les analyses CODIV-19 and Preparedness NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-DRC-MSP-223714-NC-RF Q / SELECTION D'UN PRESTA TAIRE CHARGE D'ASSURER L Component 1: Emergency C E STOCKAGE ET LA GESTION OVID-19 Response, National Request for Quota Single Stage - One E IDA / D6020 Post Open - National 500,000.00 0.00 Canceled 2021-03-14 2021-05-09 2021-11-05 DES MATERIELS MEDICAUX E and Sub-national Prevention tions nvelope T MEDICAMENTS ACQUIS PAR and Preparedness LE PDSS DANS LE CADRE DE L'APPUI A LA REPONSE A LA COVID-19. ZR-DRC-MSP-227651-NC-DIR / Contractualisation en Enten Component 1: Emergency C te Directe (ED) avec une Fir OVID-19 Response, National me chargée assurer la forma IDA / D6020 Post Direct Selection Direct 369,000.00 486,850.30 Signed 2021-04-27 2021-08-26 2021-05-02 2021-10-26 2021-06-06 2021-10-30 2021-12-03 and Sub-national Prevention tion et l’accompagnement de and Preparedness s maintenanciers de ces Unit és de production dans les 8 S ites d’installation. ZR-DRC-MSP-232830-NC-DIR / Contractualisation par ente nte directe avec WAGENIA, p Component 1: Emergency C restataire chargé d'assurer le OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 3,785,310.80 3,967,170.43 Signed 2021-05-31 2021-06-15 2021-06-05 2021-10-27 2021-07-10 2021-05-17 2022-01-06 stockage et la gestion des m and Sub-national Prevention atériels médicaux et médica and Preparedness ments acquis par le PDSS da ns le cadre de l'appui à la rip oste à la COVID-19 (BFP) ZR-DRC-MSP-244166-NC-DIR / Contractualisation en Enten te Directe (ED) avec les Etabl Component 1: Emergency C issements PHATKIN Consulta OVID-19 Response, National nt chargé pour la prise en ch IDA / 66010 Post Direct Selection Direct 500,000.00 484,872.37 Signed 2021-08-27 2021-07-14 2021-09-01 2021-07-15 2021-10-06 2021-07-31 2022-04-04 and Sub-national Prevention arge sur financement COVID- and Preparedness 19 des coûts logistiques pour l’acheminement des médica ments dans 38 Formations S anitaires ciblées 16 Province s rest ZR-DRC-MSP-267598-CW-DI R / Contractualisation par ent Component 1: Emergency C ente directe avec UNICEF po OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 6,006,600.00 6,006,600.00 Signed 2022-01-28 2022-01-05 2022-02-02 2022-03-28 2022-03-09 2022-06-03 2022-09-05 ur l'Assistance technique de l and Sub-national Prevention ’UNICEF à la réalisation des t and Preparedness ravaux de construction du Hu b de Lubumbashi ZR-DRC-MSP-272446-NC-DIR / Contractualisation par ente Component 1: Emergency C nte directe avec OMS pour le OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 3,347,586.00 3,347,586.00 Signed 2022-02-28 2022-02-23 2022-03-05 2022-03-09 2022-04-09 2022-06-29 2022-10-06 Renforcement du déploieme and Sub-national Prevention nt de la vaccination contre la and Preparedness COVID-19 de la phase II en R DC ZR-DRC-MSP-303064-NC-RF Component 1: Emergency C Q / MISE EN PLACE DU CALL OVID-19 Response, National Single Stage - One E IDA / D6020 Post Request for Bids Limited 435,100.00 0.00 Signed 2022-10-24 2022-12-22 2022-10-29 2022-10-28 2022-12-10 2023-01-11 2023-01-09 2023-02-07 2023-02-13 2023-08-12 CENTER COMME MECANISME and Sub-national Prevention nvelope DE GESTION DE PLAINTES and Preparedness ZR-DRC-MSP-247190-NC-RF Component 2: Communicati Q / Service de production et on campaign, Community En Request for Quota Single Stage - One E de location des panneaux d’a IDA / D6020 Post Open - National 298,733.00 0.00 Canceled 2021-08-24 2021-10-19 2022-04-17 gagement and Behavior cha tions nvelope ffichage au besoin de sensibil nge isation à la campagne de vac cination au COVID-19 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-DRC-MSP-265616-CS-QC BS / Recrutement d'un Consu ltant (Firme ou Bureau d’Etu Component 1: Emergency C des) chargé d’appuyer le PD OVID-19 Response, National Quality And Cost- IDA / 66010 Post Open - National 90,000.00 0.00 Canceled 2022-01-27 2021-12-08 2022-02-17 2022-04-02 2022-04-30 2022-05-30 2022-07-04 2022-08-08 2023-08-08 SS dans l’élaboration du doss and Sub-national Prevention Based Selection ier technique et du devis des and Preparedness travaux ainsi que de la super vision et contrôle technique des travaux de réaménagem ent du triage, ZR-DRC-MSP-220525-CS-QC BS / Recrutement d'un consul Component 3: Implementati tant (cabinet) chargé de l'au Quality And Cost- IDA / 66010 on Management and Monitor Post Open - National 400,000.00 0.00 Canceled 2021-03-18 2021-03-08 2021-04-08 2021-03-12 2021-05-22 2021-06-19 2021-07-19 2021-08-23 2021-09-27 2022-09-27 dit externe de l'UG PDSS (PD Based Selection ing & Evaluation SS, REDISSE, PMNS et COVID -19) pour les exercices 2020, 2021 et 2022 INDIVIDUAL CONSULTANTS Page 5 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Emergency C ZR-DRC-MSP-166434-CS-CD OVID-19 Response, National S / Recrutement d'un Consult IDA / 66010 Post Direct Selection Direct 20,000.00 21,000.00 Signed 2020-03-27 2020-04-21 2020-04-06 2021-05-14 2020-06-10 2021-05-19 2020-12-07 and Sub-national Prevention ant en communication and Preparedness ZR-DRC-MSP-166451-CS-CD Component 1: Emergency C S / Prestataire Oxfam on WA OVID-19 Response, National SH and community engagem IDA / 66010 Prior Direct Selection Direct 5,000,000.00 4,955,429.00 Signed 2020-03-30 2020-04-20 2020-04-09 2020-05-18 2020-06-13 2020-06-05 2020-12-10 and Sub-national Prevention ent/communication for Kinsh and Preparedness asa, Bas Congo, Kwango, Kiw lu for 12 months ZR-DRC-MSP-174600-CS-CD S / Contractualisation en ent Component 1: Emergency C ente directe avec l'UNICEF p OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 3,268,313.00 0.00 Canceled 2020-05-21 2020-07-31 2020-05-31 2020-08-04 2021-01-31 our la mise en oeuvre du pla and Sub-national Prevention n national de réponse contre and Preparedness l'épidémie au COVID-19 en R DC ZR-DRC-MSP-185810-CS-CD S / Contractualisation en Ent ente Directe d'un contrat de Component 4: Contingency prestation de services de Poi IDA / 66010 Emergency Response Comp Post Direct Selection Direct 40,000.00 50,800.00 Signed 2020-07-27 2020-08-03 2020-08-06 2020-07-27 2020-10-10 2020-09-01 2021-04-08 nt Focal pour le Projet d’Urge onent (CERC) nce en appui à la Riposte et Préparation de la COVID-19 e n RDC, avec Monsieur Jean Pi erre LOKONGA NZEYABE ZR-DRC-MSP-186024-CS-CD S / Contractualisation en ent ente avec Monsieur LELO LO Component 4: Contingency NDA FABRICE consultant cha IDA / 66010 Emergency Response Comp Post Direct Selection Direct 20,000.00 0.00 Canceled 2020-07-31 2020-08-10 2020-10-14 2021-04-12 rgé d’assistance technique à onent (CERC) la finalisation, le suivi de l’uti lisation de la base de donnée s unifiée et la formation des utilisateurs ZR-DRC-MSP-218274-CS-CD S / Contractualisation par ent ente directe avec Monsieur Je Component 1: Emergency C an-Trésor NZALI BOSUA Cons OVID-19 Response, National ultant individuel chargé de la IDA / D6020 Post Direct Selection Direct 50,000.00 69,773.00 Signed 2021-03-17 2021-02-15 2021-03-27 2021-02-12 2021-05-31 2021-02-20 2021-11-27 and Sub-national Prevention mise à jour du plan d'engage and Preparedness ment environnemental et soc ial et du cadre de Gestion En vironnemental et social du Pr ojet d'Urgence en appui à la ZR-DRC-MSP-244267-CS-CD S / Contractualisation par ent Component 1: Emergency C ente directe avec l'Etablisse OVID-19 Response, National IDA / 66010 Post Direct Selection Direct 73,694.00 73,694.00 Signed 2021-08-17 2021-08-27 2021-08-27 2021-10-18 2021-10-31 2021-05-02 2022-04-29 ment d'Utilité Publique (EUP) and Sub-national Prevention FBP KINHSASA pour la missio and Preparedness n d'Agence d'Achat Stratégiq ue COVID-19 ZR-DRC-MSP-245799-CS-IND Component 1: Emergency C V / Contractualisation par ent OVID-19 Response, National Individual Consult ente directe avec Monsieur I IDA / 66010 Prior Direct 204,000.00 95,150.00 Signed 2021-08-19 2021-09-11 2021-08-29 2021-10-01 2021-09-19 2021-10-06 2021-10-24 2021-10-01 2022-04-22 and Sub-national Prevention ant Selection tchi Gnon AYINDO, Spécialist and Preparedness e en Passation des Marchés ZR-DRC-MSP-239855-CS-IND V / Contractualisation par ent Component 1: Emergency C ente directe avec Monsieur Pi OVID-19 Response, National Individual Consult erre K. BWALE Assistant Tec IDA / D6020 Post Direct 72,000.00 62,400.00 Signed 2021-08-31 2021-08-03 2021-09-10 2021-08-10 2021-10-01 2021-09-24 2021-11-05 2021-09-28 2022-05-04 and Sub-national Prevention ant Selection hnique en appui au Program and Preparedness me Elargie de Vaccination (P EV) dans le cadre du Finance ment additionnel du Projet C OVID-19 ZR-DRC-MSP-259014-CS-IND V / Contractualisation par Ent Component 2: Communicati ente Directe (ED) avec Monsi on campaign, Community En Individual Consult IDA / 66010 Post Direct 57,000.00 56,400.00 Signed 2021-11-03 2021-11-01 2021-11-13 2021-11-19 2021-12-04 2021-11-19 2022-01-08 2021-11-30 2022-07-07 eur Evariste KAYEMBE, Consu gagement and Behavior cha ant Selection ltant spécialiste en Violence nge Basée sur le Genre (VBG) en appui au Projet COVID-19. ZR-DRC-MSP-265617-CS-IND V / Contractualisation par ent ente directe avec Monsieur S amuelson LUKIMUENA KUBA, Component 3: Implementati Individual Consult consultant chargé de l'élabor IDA / 66010 on Management and Monitor Post Direct 14,000.00 9,850.00 Signed 2022-01-27 2021-12-08 2022-02-06 2022-03-09 2022-02-27 2022-03-09 2022-04-03 2022-03-10 2022-09-30 ant Selection ation d'un manuel simplifié d ing & Evaluation es opérations pour une interv ention d'urgence pour la prév ention contre le Coronavirus Disease 2019-Covid-19 ZR-DRC-MSP-267565-GO-DI R / Contractualisation par Ent Component 1: Emergency C ente Directe avec l'UNICEF p OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 25,646,782.88 24,964,282.88 Signed 2022-01-27 2022-02-01 2022-02-06 2022-03-01 2022-04-12 2022-06-03 2022-10-09 our la Mise en œuvre des acti and Sub-national Prevention vités programmatiques en ap and Preparedness pui au déploiement de la vac cination contre la COVID‐19 ZR-DRC-MSP-232828-CS-IND V / Recrutement d'un Consult Component 1: Emergency C ant National en Communicati OVID-19 Response, National Individual Consult on pour appuyer les préparat IDA / D6020 Post Limited 57,600.00 0.00 Canceled 2021-05-31 2021-06-05 2021-06-26 2021-07-31 2022-01-27 and Sub-national Prevention ant Selection ifs et la mise en œuvre du Pl and Preparedness an d'introduction du Vaccin c ontre la COVID-19 dans le vol et Communication ZR-DRC-MSP-275987-CS-CD S / Contractualisation avec M Component 1: Emergency C r Sylvain YUMA RAMAZANI, C OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 78,000.00 0.00 Canceled 2022-02-11 2022-02-21 2022-04-27 2023-04-22 onsultant Conseiller Techniqu and Sub-national Prevention e Stratégique Sénior du Minis and Preparedness tre de la Santé, Hygiène et Pr évention ZR-DRC-MSP-228785-CS-CD Component 1: Emergency C S / Contractualisation par ent OVID-19 Response, National ente directe avec CREDES po IDA / D6020 Prior Direct Selection Direct 2,400,000.00 0.00 Canceled 2021-04-30 2021-06-22 2021-05-10 2021-11-01 2021-07-14 2022-01-10 and Sub-national Prevention ur le Monitoring externe pour and Preparedness la vaccination COVID-19 Page 6 ZR-DRC-MSP-280949-CS-CD S / Contractualisation avec C Component 1: Emergency C ARITAS CONGO ASBL par ent OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 1,000,000.00 1,000,000.00 Signed 2022-02-24 2022-03-10 2022-03-06 2022-03-29 2022-05-10 2022-07-17 2022-11-06 ente directe pour la commu and Sub-national Prevention nication et la vaccination con and Preparedness tre le COVID19 dans la Ville P rovince de Kinshasa. ZR-DRC-MSP-280883-CS-CD Component 1: Emergency C S / Contractualisation par ent OVID-19 Response, National ente directe avec CREDES po IDA / D6020 Prior Direct Selection Direct 4,000,000.00 4,000,000.00 Signed 2022-03-02 2022-03-09 2022-03-12 2022-03-10 2022-05-16 2022-05-28 2023-11-07 and Sub-national Prevention ur le Monitoring externe pour and Preparedness la vaccination COVID-19 ZR-DRC-MSP-284976-CS-CD S / Contractualisation par ent ente directe pour la mission Component 1: Emergency C d'accompagnement techniqu OVID-19 Response, National e de la mise en place de Huit IDA / D6020 Post Direct Selection Direct 365,991.60 365,991.60 Terminated 2022-05-10 2022-04-20 2022-05-20 2022-04-28 2022-07-24 2022-05-08 2023-01-20 and Sub-national Prevention (8) and Preparedness Unités de production d'oxygè ne dans les 5 Provinces les pl us Affectées par COVID‐19 en R D. Congo avec STEM DRC ZR-DRC-MSP-287491-CS-IND V / Contractualisation par ent Component 3: Implementati Individual Consult ente directe avec Mme. NGE IDA / D6020 on Management and Monitor Post Direct 145,090.80 67,200.00 Signed 2022-04-08 2022-04-07 2022-04-18 2022-04-19 2022-05-09 2022-04-21 2022-06-13 2022-04-23 2024-06-30 ant Selection NDE LIONZO Philomène au P ing & Evaluation oste de Spécialiste en Passati on des Marchés ZR-DRC-MSP-291531-CS-CD Component 1: Emergency C S / Contractualisation par ent OVID-19 Response, National ente directe avec OMS pour l IDA / D6020 Post Direct Selection Direct 875,000.00 0.00 Canceled 2022-06-23 2022-05-14 2022-07-03 2022-09-06 2023-03-05 and Sub-national Prevention a mission de renforcement d and Preparedness u Triage et isolement dans 5 CTCO Cibles ZR-DRC-MSP-293808-CS-IND V / Renouvellement du contr Component 3: Implementati Individual Consult at avec le Point Focal pour P IDA / D6020 on Management and Monitor Post Direct 78,000.00 78,000.00 Signed 2022-05-20 2022-05-11 2022-05-30 2022-05-13 2022-06-20 2022-05-20 2022-07-25 2022-05-24 2023-04-30 ant Selection rojet d’Urgence en appui à la ing & Evaluation Riposte et Préparation de la COVID-19 en RDC ZR-DRC-MSP-295895-CS-CD S / Contractualisation par Ent ente directe avec OMS pour Component 1: Emergency C appuyer le PDSS dans le renf OVID-19 Response, National orcement des services de tri IDA / D6020 Prior Direct Selection Direct 3,000,000.00 0.00 Signed 2022-08-30 2022-08-09 2022-09-09 2022-08-18 2022-11-13 2023-05-12 and Sub-national Prevention age et d’isolement des 5 CTC and Preparedness O ciblés et de Formation de 4 30 prestataires et cadres du minisanté aux soins intensifs et de réanimation d’urgences … ZR-DRC-MSP-313680-CS-IND V / Recrutement d’un Consult Component 1: Emergency C ant international Coordonnat OVID-19 Response, National Individual Consult Open - Internationa Under Implement IDA / 69620 Post 142,600.00 0.00 2022-11-24 2022-09-05 2023-01-12 2023-02-02 2023-03-09 2023-09-05 eur Adjoint au sein de l’Unité and Sub-national Prevention ant Selection l ation de Gestion du Programme de and Preparedness Développement du Secteur d e la Santé (UG-PDSS) ZR-DRC-MSP-232814-CS-CD S / Contractualisation par ent ente directe avec Health Car Component 1: Emergency C ology (USA), pour Achat d’un OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 36,357.00 0.00 Canceled 2021-05-31 2021-06-10 2021-08-14 2022-02-10 logiciel pour l’implémentatio and Sub-national Prevention n de la numérisation des don and Preparedness nées (Health Carology) et po ur la Formation des Prestatai res et Membres de l’Equipe C adre des ZR-DRC-MSP-207704-CS-CD S / Recrutement d'un Archite Component 1: Emergency C cte pour élaborer le devis tec OVID-19 Response, National IDA / D6020 Post Direct Selection Direct 3,500.00 0.00 Canceled 2020-12-14 2020-12-24 2021-02-27 2021-08-26 hnique des travaux et acquisi and Sub-national Prevention tion des fournitures pour la r and Preparedness éhabilitation du bureau du S G/MSP ZR-DRC-MSP-189970-CS-CD S / Contractualisation par ent Component 1: Emergency C ente directe avec la firme S OVID-19 Response, National IDA / D6020 Prior Direct Selection Direct 500,000.00 0.00 Canceled 2020-08-25 2020-09-04 2020-11-08 2021-05-07 HIPPING GREAT LAKE DRC po and Sub-national Prevention ur la mission d'appui techniq and Preparedness ue à la gestion d'urgence CO VID-19 ZR-DRC-MSP-333104-CS-CD Component 1: Emergency C S / Contractualisation par ent OVID-19 Response, National Under Implement ente directe avec l'EUP Kinsh IDA / 69620 Post Direct Selection Direct - National 66,150.00 0.00 2023-01-26 2023-01-20 2023-02-05 2023-04-11 2023-10-08 and Sub-national Prevention ation asa pour la mise en œuvre d and Preparedness u contrat de performances d e 35 zones de santé ZR-DRC-MSP-357411-CS-IND V / Recrutement de deux con sultants international et natio Component 1: Emergency C nal pour un état des lieux de OVID-19 Response, National Individual Consult Under Implement IDA / 69620 Post Limited 50,000.00 0.00 2023-06-29 2023-05-03 2023-07-04 2023-07-25 2023-08-29 2023-10-13 la gestion des équipements e and Sub-national Prevention ant Selection ation t infrastructures et l’élaborati and Preparedness on des cahiers de charge de gestion de suivi et de gestion des ressources matérielles Page 7 PROCUREMENT PLAN (Textual Part) Project information: Rwanda Commercialization and De-Risking for Agricultural Transformation Project (P171462) Project Implementation agency: Rwanda Development Bank Date of the Procurement Plan: Oct 25, 2022 Period covered by this Procurement Plan: The first 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Procurement Regulation for IPF Finance for Borrowers, November 2020, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable Other Relevant Procurement Information. Not Applicable PROCUREMENT Rwanda : Commercialization and De-Risking for Agricultural Transformation Project PLAN General Information Country: Rwanda 2022-11-22 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P171462 GPN Date: Project Name: Commercialization and De-Risking for Agricultural Transformation Project Loan / Credit No: IDA / 70840 Rwanda Agriculture and Animal Resources Development Board Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Bids - RW-RAB-317657-CW-RFB / R Value Chain and Infrastructu Single Stage - One E Works (without pr Pending Imp 2025-10-1 ehabilitation works of Rubuy IDA / 70840 Post Request for Bids Open - National 1,182,500.00 0.00 2024-06-23 2024-06-28 2024-07-28 2024-08-31 2024-10-15 re Development nvelope equalification) SP lementation 4 enge - Burakari marshland D RW-RAB-317666-CW-RFB / I Request for Bids - mprovement of drainage wor Value Chain and Infrastructu Single Stage - One E Works (without pr Pending Imp 2024-07-1 IDA / 70840 Post Request for Bids Open - National 700,000.00 0.00 2023-04-02 2023-04-07 2023-05-07 2023-06-06 2023-07-20 ks for Karangazi - Rwangingo re Development nvelope equalification) SP lementation 9 marshland phase I D RW-RAB-322117-CW-RFB / C Request for Bids - onstruction and development Value Chain and Infrastructu Single Stage - One E Small Works SPD Under Imple 2025-01-3 IDA / 70840 Post Request for Bids Open - National 1,385,000.00 0.00 2023-06-18 2023-05-02 2023-06-23 2023-08-04 2023-09-03 2023-10-08 of Karambi dam and marshla re Development nvelope (1 envelope proce mentation 0 nd located in Kayonza Distric ss) t - Eastern Province RW-RAB-322266-CW-RFB / D evelopment works of hillside Request for Bids - irrigation system including co Value Chain and Infrastructu Open - Internationa Single Stage - One E Small Works SPD Pending Imp 2025-03-1 IDA / 70840 Post Request for Bids 4,980,000.00 0.00 2023-03-15 2023-03-20 2023-05-23 2023-06-22 2023-07-27 nstruction of water diversion re Development l nvelope (1 envelope proce lementation 8 for Bakokwe Site located in M ss) uhanga District - Southern pr ovince RW-RAB-325187-CW-RFB / D Value Chain and Infrastructu Open - Internationa Single Stage - One E Other (with field f 40,758,285.0 Pending Imp 2026-12-0 evelopment works of Cyohoh IDA / 70840 Prior Request for Bids 0.00 2023-04-30 2023-05-05 2023-06-16 2023-07-16 2023-08-20 re Development l nvelope or explanation) 0 lementation 2 a marshland Request for Bids - RW-RAB-317599-CW-RFB / R Value Chain and Infrastructu Open - Internationa Single Stage - One E Works (without pr 22,850,000.0 Pending Imp 2025-12-0 ehabilitation works of Bugara IDA / 70840 Prior Request for Bids 0.00 2023-04-02 2023-04-07 2023-06-06 2023-07-06 2023-08-19 re Development l nvelope equalification) SP 0 lementation 6 ma marshland D RW-RAB-322094-CW-RFB / R Request for Bids - Value Chain and Infrastructu Single Stage - One E Pending Imp 2025-02-2 ehabilitation works of Karang IDA / 70840 Post Request for Bids Open - National Plant SPD (withou 1,666,600.00 0.00 2023-01-15 2023-01-20 2023-03-03 2023-04-02 2023-05-07 re Development nvelope lementation 5 azi - Rwangingo marshlands t prequalification) Request for Bids - RW-RAB-325204-CW-RFB / D Value Chain and Infrastructu Single Stage - One E Small Works SPD Pending Imp 2025-11-0 evelopment works of Nyarub IDA / 70840 Post Request for Bids Open - National 1,932,700.00 0.00 2023-06-25 2023-06-30 2023-08-11 2023-09-10 2023-10-15 re Development nvelope (1 envelope proce lementation 3 ogo and Agasasa marshlands ss) Request for Bids - RW-RAB-325198-CW-RFB / D Value Chain and Infrastructu Single Stage - One E Works (without pr Pending Imp 2025-10-0 evelopment works of Kamira IDA / 70840 Post Request for Bids Open - National 345,000.00 0.00 2023-05-28 2023-06-02 2023-07-14 2023-08-13 2023-09-17 re Development nvelope equalification) SP lementation 6 nzovu marshland D Request for Bids - RW-RAB-325194-CW-RFB / D Value Chain and Infrastructu Single Stage - One E Works (without pr Pending Imp 2025-09-0 evelopment works of Muvum IDA / 70840 Post Request for Bids Open - National 1,945,700.00 0.00 2023-04-30 2023-05-05 2023-06-16 2023-07-16 2023-08-20 re Development nvelope equalification) SP lementation 8 ba mashland D RW-RAB-325173-CW-RFB / R Value Chain and Infrastructu Single Stage - One E Other (with field f 2025-06-1 ehabilitation of Rubuyenge - IDA / 70840 Post Request for Bids Open - National 1,230,500.00 0.00 Canceled 2023-05-31 2023-06-05 2023-07-17 2023-08-16 2023-09-20 re Development nvelope or explanation) 1 Burakari marshlands GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-RAB-317905-GO-RFB / P Agricultural Finance and Ins Single Stage - One E Pending Impl IDA / 70840 Post Request for Bids Open - National 270,000.00 0.00 2023-03-05 2023-03-10 2023-04-09 2023-05-09 2023-06-13 2023-11-10 urchase of RFID microchips a urance nvelope ementation nd scanners RW-RAB-317909-GO-RFB / P Single Stage - One E IDA / 70840 Project Management Post Request for Bids Open - National 330,000.00 0.00 Signed 2022-12-27 2023-02-22 2023-01-01 2023-02-22 2023-01-31 2023-03-24 2023-03-02 2023-03-31 2023-04-06 2023-10-03 urchase of Project vehicles nvelope RW-RAB-317911-GO-RFB / P Single Stage - One E IDA / 70840 Project Management Post Request for Bids Open - National 180,000.00 0.00 Signed 2022-12-27 2023-02-19 2023-01-01 2023-02-22 2023-01-31 2023-03-24 2023-03-02 2023-03-27 2023-04-06 2023-10-03 urchase of Project motorcycl nvelope es RW-RAB-317934-GO-RFB / P Single Stage - One E Pending Impl IDA / 70840 Project Management Post Request for Bids Open - National 115,000.00 0.00 2023-01-08 2023-01-13 2023-02-12 2023-03-14 2023-04-18 2024-04-17 urchase of fuel for project mo nvelope ementation tor vehicles RW-RAB-317936-GO-RFB / P Single Stage - One E Pending Impl urchase of office equipment IDA / 70840 Project Management Post Request for Bids Open - National 55,000.00 0.00 2023-04-30 2023-05-05 2023-06-04 2023-07-04 2023-08-08 2024-08-07 nvelope ementation and stationery RW-RAB-319138-GO-RFB / Pr Value Chain and Infrastructu Single Stage - One E Under Imple ovision of horticulture input k IDA / 70840 Post Request for Bids Open - National 300,000.00 0.00 2023-03-08 2023-03-29 2023-03-13 2023-03-29 2023-04-12 2023-05-12 2023-06-16 2024-06-16 re Development nvelope mentation it (seed, fertilizer, compost a nd lime) RW-RAB-330156-GO-RFB / P Single Stage - One E Pending Impl IDA / 70840 Project Management Post Request for Bids Open - National 40,000.00 0.00 2023-04-05 2023-04-10 2023-05-22 2023-06-21 2023-07-26 2024-07-25 urchase of office furniture nvelope ementation RW-RAB-356696-GO-RFB / A Value Chain and Infrastructu Single Stage - One E Pending Impl IDA / 70840 Post Request for Bids Open - National 200,000.00 0.00 2023-05-22 2023-05-27 2023-07-08 2023-08-07 2023-09-11 2024-09-10 cquisition of fruit seedlings re Development nvelope ementation RW-RAB-356699-GO-RFB / A Value Chain and Infrastructu Single Stage - One E Pending Impl IDA / 70840 Post Request for Bids Open - National 100,000.00 0.00 2023-06-07 2023-06-12 2023-07-24 2023-08-23 2023-09-27 2024-09-26 cquisition of pineapple sucke re Development nvelope ementation rs RW-RAB-356703-GO-RFB / s Value Chain and Infrastructu Single Stage - One E Pending Impl IDA / 70840 Post Request for Bids Open - National 800,000.00 0.00 2023-08-22 2023-08-27 2023-10-08 2023-11-07 2023-12-12 2025-12-11 upply of compost re Development nvelope ementation RW-RAB-356709-GO-RFB / A Value Chain and Infrastructu Open - Internationa Single Stage - One E Pending Impl IDA / 70840 Post Request for Bids 1,400,000.00 0.00 2023-04-27 2023-05-02 2023-06-13 2023-07-13 2023-08-17 2023-10-28 cquisition of agricultural inpu re Development l nvelope ementation ts Page 1 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-RAB-317904-NC-RFB / Hi ring insurance companies for Agricultural Finance and Ins Single Stage - One E Under Imple IDA / 70840 Post Request for Bids Open - National 1,000,000.00 0.00 2023-01-22 2023-04-20 2023-01-27 2023-05-02 2023-02-26 2023-03-28 2023-05-02 2024-05-01 provision of Premium co-fina urance nvelope mentation ncing for subsidies crops and livestock RW-RAB-317938-NC-RFB / Hi Single Stage - One E Under Imple ring hotel services for confer IDA / 70840 Project Management Post Request for Bids Open - National 195,000.00 0.00 2023-03-26 2023-03-14 2023-03-31 2023-03-27 2023-04-30 2023-05-30 2023-07-04 2026-07-03 nvelope mentation ences, training and workshop s RW-RAB-317939-NC-RFB / Pr Single Stage - One E Under Imple IDA / 70840 Project Management Post Request for Bids Open - National 100,000.00 0.00 2022-12-18 2023-03-29 2022-12-23 2023-03-30 2023-01-22 2023-02-21 2023-03-28 2026-03-27 ovision of printing services nvelope mentation CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-RAB-317879-CS-QCBS / Value Chain and Infrastructu Quality And Cost- Under Implement Hiring a consultancy firm tha IDA / 70840 Post Open - National 140,000.00 0.00 2023-12-17 2023-05-30 2024-01-07 2024-02-20 2024-03-21 2024-04-20 2024-05-25 2024-06-29 2027-06-29 re Development Based Selection ation t will conduct valuation asset s RW-RAB-317894-CS-QCBS / Hiring the consultancy firm f Agricultural Finance and Ins Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 150,000.00 0.00 2023-05-28 2023-06-18 2023-08-01 2023-08-31 2023-09-30 2023-11-04 2023-12-09 2024-04-07 or situation agriculture insura urance Based Selection ntation nce situation analysis RW-RAB-321128-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme carry out preparation of Rese IDA / 70840 Post Open - National 62,900.00 0.00 2023-06-03 2023-06-24 2023-08-07 2023-09-04 2023-10-04 2023-11-08 2023-12-13 2024-05-11 re Development Based Selection ntation ttlement Action Plan (RAP) re port for Cyohoha marshland and hillside irrigation RW-RAB-321150-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- IDA / 70840 Post Open - National 27,900.00 0.00 Under Review 2023-04-16 2023-06-26 2023-05-07 2023-06-20 2023-07-18 2023-08-17 2023-09-21 2023-10-26 2024-03-24 preparation of Resettlement re Development Based Selection Action Plan (RAP) report for B ugarama marshland RW-RAB-321325-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Pending Impleme ocial Impact Assessment (ESI IDA / 70840 Post Open - National 35,725.00 0.00 2023-07-16 2023-08-06 2023-09-19 2023-10-17 2023-11-16 2023-12-21 2024-01-25 2024-06-23 re Development Based Selection ntation A) & Environmental and Soci al Management Plans (ESMPS ) for Mwogo, Agatorove and Gipfuna marshlands RW-RAB-321333-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 53,225.00 0.00 2023-07-30 2023-08-20 2023-10-03 2023-10-31 2023-11-30 2024-01-04 2024-02-08 2024-07-07 ocial Impact Assessment (ESI re Development Based Selection ntation A) & Environmental and Soci al Management Plans (ESMPS ) for Kageyo marshland RW-RAB-321343-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Prior 2,300,000.00 0.00 2023-04-30 2023-05-21 2023-07-04 2023-08-01 2023-08-31 2023-10-05 2023-11-09 2026-02-26 supervision of rehabilitation re Development Based Selection ntation works for Bugarama marshla nd RW-RAB-321378-CS-QCBS / Hiring a Consultancy firm for supervision of Construction a Value Chain and Infrastructu Quality And Cost- Open - Internationa Under Implement IDA / 70840 Post 122,500.00 0.00 2023-03-12 2023-02-16 2023-04-02 2023-03-27 2023-05-16 2023-06-13 2023-07-13 2023-08-17 2023-09-21 2025-03-14 nd development of Karambi re Development Based Selection l ation Dam and marshland located i n Kayonza District - Eastern P rovince RW-RAB-321385-CS-QCBS / Hiring a Consultancy firm for supervision of Development Value Chain and Infrastructu Quality And Cost- Under Implement works of hillside irrigation sys IDA / 70840 Post Open - National 475,000.00 0.00 2023-04-16 2023-02-16 2023-05-07 2023-06-20 2023-07-18 2023-08-17 2023-09-21 2023-10-26 2025-10-15 re Development Based Selection ation tem including construction of water diversion for Bakokwe Site located in Muhanga Distr ict - Southern province RW-RAB-321421-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- Pending Impleme supervision of irrigation deve IDA / 70840 Post Open - National 340,000.00 0.00 2023-03-12 2023-04-02 2023-05-16 2023-06-13 2023-07-13 2023-08-17 2023-09-21 2025-06-12 re Development Based Selection ntation lopment works for Karangazi - Rwangingo marshlands RW-RAB-321539-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 50,000.00 0.00 2024-08-25 2024-09-15 2024-10-29 2024-11-26 2024-12-26 2025-01-30 2025-03-06 2025-07-04 preparation of Resettlement re Development Based Selection ntation Action Plan (RAP) report for K ageyo marshland RW-RAB-322305-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake feasibility and det IDA / 70840 Post Open - National 78,500.00 0.00 2023-01-08 2023-01-29 2023-03-14 2023-04-11 2023-05-11 2023-06-15 2023-07-20 2024-07-19 re Development Based Selection ntation ailed design study for irrigati on development works of Ka nyegenyege marshland RW-RAB-322317-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement IDA / 70840 Post Open - National 35,500.00 0.00 2023-07-16 2023-06-22 2023-08-06 2023-09-19 2023-10-17 2023-11-16 2023-12-21 2024-01-25 2024-06-23 ocial Impact Assessment (ESI re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Nasho marshland RW-RAB-322361-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake feasibility and det IDA / 70840 Post Open - National 226,800.00 0.00 2023-01-08 2023-01-29 2023-03-14 2023-04-11 2023-05-11 2023-06-15 2023-07-20 2024-07-19 re Development Based Selection ntation ailed design study for irrigati on development works of Mw ogo marshland Page 2 RW-RAB-322424-CS-QCBS / Hiring a Consultancy firm to undertake feasibility and det Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 32,750.00 0.00 2023-01-29 2023-02-19 2023-04-04 2023-05-02 2023-06-01 2023-07-06 2023-08-10 2024-08-09 ailed design study for irrigati re Development Based Selection ntation on development works of Ny abuyogera, Kigaga, Nyakany eri and Ruvugangoma marshl ands RW-RAB-322441-CS-QCBS / Hiring a Consultancy firm to undertake feasibility and det Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 101,150.00 0.00 2023-02-19 2023-03-12 2023-04-25 2023-05-23 2023-06-22 2023-07-27 2023-08-31 2024-08-30 ailed design study for irrigati re Development Based Selection ntation on development works of Ag atorove and Gipfuna marshla nds RW-RAB-322477-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake detailed design st IDA / 70840 Post Open - National 148,000.00 0.00 2023-04-09 2023-04-30 2023-06-13 2023-07-11 2023-08-10 2023-09-14 2023-10-19 2024-10-18 re Development Based Selection ntation udy for irrigation developme nt works of Kajevuba and Gat una marshlands RW-RAB-322577-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 100,000.00 0.00 2023-05-28 2023-06-18 2023-08-01 2023-08-29 2023-09-28 2023-11-02 2023-12-07 2024-12-06 detailed design study of Cya re Development Based Selection ntation bayaga marshland RW-RAB-322578-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 37,500.00 0.00 2023-07-30 2023-08-20 2023-10-03 2023-10-31 2023-11-30 2024-01-04 2024-02-08 2024-07-07 ocial Impact Assessment (ESI re Development Based Selection ntation A) & Environmental and Soci al Management Plans (ESMPS ) for Rurambi marshland RW-RAB-322579-CS-QCBS / Value Chain and Infrastructu Quality And Cost- Pending Impleme Hiring a Consultancy firm for IDA / 70840 Post Open - National 50,000.00 0.00 2023-05-28 2023-06-18 2023-08-01 2023-08-29 2023-09-28 2023-11-02 2023-12-07 2024-12-06 re Development Based Selection ntation detailed design study of Rura mbi marshland RW-RAB-322605-CS-QCBS / Value Chain and Infrastructu Quality And Cost- Pending Impleme Hiring a Consultancy firm for IDA / 70840 Post Open - National 255,000.00 0.00 2023-09-24 2023-10-15 2023-11-28 2023-12-26 2024-01-25 2024-02-29 2024-04-04 2025-04-04 re Development Based Selection ntation detailed design study of Kag eyo marshland RW-RAB-322817-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 102,500.00 0.00 2024-04-14 2024-05-05 2024-06-18 2024-07-16 2024-08-15 2024-09-19 2024-10-24 2025-12-23 supervision of Rubuyenge - B re Development Based Selection ntation urakari marshland RW-RAB-325190-CS-QCBS / Value Chain and Infrastructu Quality And Cost- Open - Internationa Pending Impleme Hiring a consultancy firm for IDA / 70840 Prior 4,181,829.00 0.00 2023-05-21 2023-06-11 2023-07-25 2023-08-22 2023-09-21 2023-10-26 2023-11-30 2027-02-12 re Development Based Selection l ntation supervision of Cyohoha mars hland RW-RAB-325200-CS-QCBS / Value Chain and Infrastructu Quality And Cost- Pending Impleme Hiring a consultancy firm for IDA / 70840 Post Open - National 28,750.00 0.00 2023-07-09 2023-07-30 2023-09-12 2023-10-10 2023-11-09 2023-12-14 2024-01-18 2026-01-07 re Development Based Selection ntation supervision of Kamiranzovu marshland RW-RAB-325196-CS-QCBS / Value Chain and Infrastructu Quality And Cost- Pending Impleme Hiring a consultancy firm for IDA / 70840 Post Open - National 150,000.00 0.00 2023-05-10 2023-05-31 2023-07-14 2023-08-11 2023-09-10 2023-10-15 2023-11-19 2025-11-08 re Development Based Selection ntation supervision of Muvumba mar shland RW-RAB-322585-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement ocial Impact Assessment (ESI IDA / 70840 Post Open - National 50,000.00 0.00 2023-07-30 2023-06-22 2023-08-20 2023-10-03 2023-10-31 2023-11-30 2024-01-04 2024-02-08 2024-07-07 re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Matimba and Kagitumba irrigation schemes RW-RAB-321326-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Pending Impleme ocial Impact Assessment (ESI IDA / 70840 Post Open - National 30,000.00 0.00 2023-09-24 2023-10-15 2023-11-28 2023-12-26 2024-01-25 2024-02-29 2024-04-04 2024-09-01 re Development Based Selection ntation A) & Environmental and Soci al Management Plans (ESMPS ) for Kibati, Nyagahembe and Mugonero irrigation schemes RW-RAB-321521-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- IDA / 70840 Post Open - National 30,000.00 0.00 Under Review 2023-05-01 2023-06-26 2023-05-22 2023-07-05 2023-08-02 2023-09-01 2023-10-06 2023-11-10 2024-03-09 preparation of Resettlement re Development Based Selection Action Plan (RAP) report for B akokwe marshland RW-RAB-322458-CS-QCBS / Hiring a Consultancy firm to undertake feasibility and det Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 42,000.00 0.00 2023-04-30 2023-05-21 2023-07-04 2023-08-01 2023-08-31 2023-10-05 2023-11-09 2024-11-08 ailed design study for rehabil re Development Based Selection ntation itation of Kibati, Nyagahemb e and Mugonero irrigation sc hemes RW-RAB-322473-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement ocial Impact Assessment (ESI IDA / 70840 Post Open - National 30,000.00 0.00 2023-09-17 2023-06-22 2023-10-08 2023-11-21 2023-12-19 2024-01-18 2024-02-22 2024-03-28 2024-08-25 re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Kajevuba and Gatuna m arshlands RW-RAB-317859-CS-QCBS / Quality And Cost- Under Implement Hiring a consultancy firm tha IDA / 70840 Project Management Post Open - National 250,000.00 0.00 2022-12-11 2023-01-27 2023-01-01 2023-02-17 2023-02-14 2023-04-06 2023-03-16 2023-04-15 2023-05-20 2023-06-24 2023-11-21 Based Selection ation t will conduct CDAT baseline RW-RAB-317749-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 31,000.00 0.00 2023-01-15 2023-02-05 2023-03-21 2023-04-20 2023-05-20 2023-06-24 2023-07-29 2024-07-28 undertake feasibility and desi re Development Based Selection ntation gn study for Runukangoma a nd Makera mashlands RW-RAB-322412-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement ocial Impact Assessment (ESI IDA / 70840 Post Open - National 30,000.00 0.00 2023-07-16 2023-06-22 2023-08-06 2023-09-19 2023-10-17 2023-11-16 2023-12-21 2024-01-25 2024-06-23 re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Kiryango, Nyirakayange and Base marshlands Page 3 RW-RAB-321322-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S ocial Impact Assessment (ESI Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 40,000.00 0.00 2024-07-21 2024-08-11 2024-09-24 2024-10-22 2024-11-21 2024-12-26 2025-01-30 2025-06-29 A) & Environmental and Soci re Development Based Selection ntation al Management Plans (ESMPS ) for Nyabuyogera, Kigaga, N yakanyeri and Ruvugangoma marshlands RW-RAB-321312-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement ocial Impact Assessment (ESI IDA / 70840 Post Open - National 50,000.00 0.00 2023-07-09 2023-06-22 2023-07-30 2023-09-12 2023-10-10 2023-11-09 2023-12-14 2024-01-18 2024-06-16 re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Kanyegenyege, Runuka ngoma and Makera marshlan ds RW-RAB-322575-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement IDA / 70840 Post Open - National 35,000.00 0.00 2023-07-30 2023-06-23 2023-08-20 2023-10-03 2023-10-31 2023-11-30 2024-01-04 2024-02-08 2024-07-07 ocial Impact Assessment (ESI re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Cyabayaga marshland RW-RAB-325176-CS-QCBS / Hiring a consultancy firm for Value Chain and Infrastructu Quality And Cost- IDA / 70840 Post Open - National 102,500.00 0.00 Canceled 2023-06-04 2023-06-25 2023-08-08 2023-09-05 2023-10-05 2023-11-09 2023-12-14 2025-08-05 supervision of Rubuyenge - B re Development Based Selection urakari marshland RW-RAB-317890-CS-QCBS / Hiring consultancy firm for N Agricultural Finance and Ins Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 150,000.00 0.00 2023-02-12 2023-03-05 2023-04-18 2023-05-18 2023-06-17 2023-07-22 2023-08-26 2023-12-22 AIS digitalization need assess urance Based Selection ntation ment (including crop and live stock schemes) RW-RAB-328977-CS-QCBS / Hiring a consultancy firm for Value Chain and Infrastructu Quality And Cost- IDA / 70840 Post Open - National 72,500.00 0.00 Canceled 2023-10-02 2023-03-16 2023-10-23 2023-12-06 2024-01-03 2024-02-02 2024-03-08 2024-04-12 2024-12-08 design study of Kamiranzovu re Development Based Selection and Nyarubogo marshlands RW-RAB-328922-CS-QCBS / Hiring a consultancy firm for Value Chain and Infrastructu Quality And Cost- IDA / 70840 Post Open - National 175,500.00 0.00 Canceled 2023-10-02 2023-03-16 2023-10-23 2023-12-06 2024-01-03 2024-02-02 2024-03-08 2024-04-12 2024-12-08 design study of Muvumba an re Development Based Selection d Agasasa marshlands RW-RAB-325205-CS-QCBS / Hiring a consultancy firm for Value Chain and Infrastructu Quality And Cost- IDA / 70840 Post Open - National 59,500.00 0.00 Canceled 2023-07-16 2023-08-06 2023-09-19 2023-10-17 2023-11-16 2023-12-21 2024-01-25 2026-01-14 supervision of development re Development Based Selection works of Nyarubogo and Aga sasa marshland RW-RAB-322319-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- undertake feasibility and det IDA / 70840 Post Open - National 49,000.00 0.00 Canceled 2022-12-18 2023-01-08 2023-02-21 2023-03-21 2023-04-20 2023-05-25 2023-06-29 2024-06-28 re Development Based Selection ailed design study for irrigati on development works of Na sho marshland RW-RAB-356357-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 200,000.00 0.00 2023-06-29 2023-07-20 2023-09-02 2023-09-30 2023-10-30 2023-12-04 2024-01-08 2025-10-29 detailed design study and su re Development Based Selection ntation pervision of Kagitumba irriga tion scheme RW-RAB-322586-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- IDA / 70840 Post Open - National 44,825.00 0.00 Canceled 2023-05-28 2023-06-18 2023-08-01 2023-08-29 2023-09-28 2023-11-02 2023-12-07 2024-12-06 detailed design study of Mati re Development Based Selection mba and Kagitumba irrigatio n schemes RW-RAB-328426-CS-QCBS / Hiring a consultancy firm for Value Chain and Infrastructu Quality And Cost- Open - Internationa IDA / 70840 Post 406,946.00 0.00 Canceled 2023-06-04 2023-03-16 2023-06-25 2023-08-08 2023-09-05 2023-10-05 2023-11-09 2023-12-14 2024-08-10 Review of design study for C re Development Based Selection l yohoha hillside and marshlan d RW-RAB-322414-CS-QCBS / Hiring a Consultancy firm to undertake detailed design st Value Chain and Infrastructu Quality And Cost- IDA / 70840 Post Open - National 42,563.00 0.00 Canceled 2023-01-29 2023-02-19 2023-04-04 2023-05-02 2023-06-01 2023-07-06 2023-08-10 2024-08-09 udy and rehabilitation for irri re Development Based Selection gation development works of Kiryango, Nyirakayange and Base marshlands RW-RAB-356382-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement IDA / 70840 Post Open - National 30,000.00 0.00 2023-05-09 2023-04-27 2023-05-30 2023-07-13 2023-08-10 2023-09-09 2023-10-14 2023-11-18 2024-03-17 ocial Impact Assessment (ESI re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Bakokwe marshland RW-RAB-356387-CS-QCBS / Hiring a consultancy firm to c arry out an Environmental So Value Chain and Infrastructu Quality And Cost- Under Implement cial Impact Assessment (ESIA IDA / 70840 Post Open - National 70,400.00 0.00 2023-05-16 2023-05-04 2023-06-06 2023-07-20 2023-08-17 2023-09-16 2023-10-21 2023-11-25 2024-03-24 re Development Based Selection ation ) & Environmental and Social Management Plans (ESMPs) f or Muvumba and Agasasa m arshlands RW-RAB-356390-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement IDA / 70840 Post Open - National 52,900.00 0.00 2023-05-16 2023-04-27 2023-06-06 2023-07-20 2023-08-17 2023-09-16 2023-10-21 2023-11-25 2024-03-24 ocial Impact Assessment (ESI re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Bugarama marshland RW-RAB-356678-CS-QCBS / Hiring a consultancy firm for Value Chain and Infrastructu Quality And Cost- Open - Internationa Under Implement IDA / 70840 Post 918,000.00 0.00 2023-05-29 2023-05-04 2023-06-19 2023-08-02 2023-08-30 2023-09-29 2023-11-03 2023-12-08 2026-07-25 Review design study and sup re Development Based Selection l ation ervision for Cyohoha hillside and marshland RW-RAB-356332-CS-QCBS / Hiring a consultancy firm to u Value Chain and Infrastructu Quality And Cost- Under Implement ndertake the rehabilitation d IDA / 70840 Post Open - National 97,500.00 0.00 2023-05-15 2023-05-12 2023-06-05 2023-06-12 2023-07-19 2023-08-16 2023-09-15 2023-10-20 2023-11-24 2025-04-17 re Development Based Selection ation esign study review and super vision of Nyarubogo irrigation scheme. RW-RAB-356338-CS-QCBS / Hiring a consultancy firm to u Value Chain and Infrastructu Quality And Cost- Under Implement ndertake the rehabilitation d IDA / 70840 Post Open - National 130,000.00 0.00 2023-05-12 2023-05-12 2023-06-02 2023-06-12 2023-07-16 2023-08-13 2023-09-12 2023-10-17 2023-11-21 2025-05-14 re Development Based Selection ation esign study review and super vision of Agasasa irrigation s cheme. Page 4 RW-RAB-356349-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake feasibility, detaile IDA / 70840 Post Open - National 119,000.00 0.00 2023-06-28 2023-07-19 2023-09-01 2023-09-29 2023-10-29 2023-12-03 2024-01-07 2025-08-29 re Development Based Selection ntation d design study and supervisi on for irrigation development works of Nasho marshland RW-RAB-356372-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake detailed design st IDA / 70840 Post Open - National 50,250.00 0.00 2023-07-12 2023-08-02 2023-09-15 2023-10-13 2023-11-12 2023-12-17 2024-01-21 2024-11-16 re Development Based Selection ntation udy and supervision for irriga tion development works of B ase marshland RW-RAB-356694-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Open - Internationa Pending Impleme undertake detailed design st IDA / 70840 Post 578,000.00 0.00 2023-06-13 2023-07-04 2023-08-17 2023-09-14 2023-10-14 2023-11-18 2023-12-23 2026-06-10 re Development Based Selection l ntation udy and supervision for irriga tion development works of G ashora marshland RW-RAB-356344-CS-QCBS / Hiring a consultancy firm to u Value Chain and Infrastructu Quality And Cost- Under Implement ndertake the rehabilitation d IDA / 70840 Post Open - National 281,250.00 0.00 2023-05-15 2023-05-12 2023-06-05 2023-06-12 2023-07-19 2023-08-16 2023-09-15 2023-10-20 2023-11-24 2025-07-16 re Development Based Selection ation esign study review and super vision of Muvumba irrigation scheme. RW-RAB-356375-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake detailed design st IDA / 70840 Post Open - National 85,000.00 0.00 2023-07-20 2023-08-10 2023-09-23 2023-10-21 2023-11-20 2023-12-25 2024-01-29 2025-03-24 re Development Based Selection ntation udy and supervision for irriga tion development works of K ajevuba marshland RW-RAB-356353-CS-QCBS / Hiring a Consultancy firm for Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 75,600.00 0.00 2023-06-30 2023-07-21 2023-09-03 2023-10-01 2023-10-31 2023-12-05 2024-01-09 2025-01-08 detailed design study and su re Development Based Selection ntation pervision of Matimba irrigatio n scheme RW-RAB-356362-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake detailed design st IDA / 70840 Post Open - National 40,500.00 0.00 2023-07-11 2023-08-01 2023-09-14 2023-10-12 2023-11-11 2023-12-16 2024-01-20 2024-11-15 re Development Based Selection ntation udy and supervision for irriga tion development works of Ki ryango marshland. RW-RAB-356689-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake detailed design st IDA / 70840 Post Open - National 238,000.00 0.00 2023-05-31 2023-06-21 2023-08-04 2023-09-01 2023-10-01 2023-11-05 2023-12-10 2025-03-04 re Development Based Selection ntation udy and supervision for irrig ation development works of Gatuna marshland RW-RAB-356366-CS-QCBS / Hiring a Consultancy firm to Value Chain and Infrastructu Quality And Cost- Pending Impleme undertake detailed design st IDA / 70840 Post Open - National 36,938.00 0.00 2023-07-18 2023-08-08 2023-09-21 2023-10-19 2023-11-18 2023-12-23 2024-01-27 2024-11-22 re Development Based Selection ntation udy and supervision for irriga tion development works of N yirakayange marshland RW-RAB-355416-CS-QCBS / Hiring a consultancy firm to u Value Chain and Infrastructu Quality And Cost- Under Implement ndertake the rehabilitation d IDA / 70840 Post Open - National 57,500.00 0.00 2023-05-17 2023-05-12 2023-06-07 2023-06-12 2023-07-21 2023-08-18 2023-09-17 2023-10-22 2023-11-26 2025-01-19 re Development Based Selection ation esign study review and super vision of Kamiranzovu irrigati on scheme. RW-RAB-358610-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement IDA / 70840 Post Open - National 30,000.00 0.00 2023-05-30 2023-05-26 2023-06-20 2023-08-03 2023-08-31 2023-09-30 2023-11-04 2023-12-09 2024-09-04 ocial Impact Assessment (ESI re Development Based Selection ation A) & Environmental Social Ma nagement for Rubuyenge - B urakari marshlands RW-RAB-365907-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement IDA / 70840 Post Open - National 30,000.00 0.00 2023-07-17 2023-06-22 2023-08-07 2023-09-20 2023-10-18 2023-11-17 2023-12-22 2024-01-26 2024-05-25 ocial Impact Assessment (ESI re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Kamiranzovu marshland RW-RAB-365913-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement IDA / 70840 Post Open - National 40,000.00 0.00 2023-07-17 2023-06-22 2023-08-07 2023-09-20 2023-10-18 2023-11-17 2023-12-22 2024-01-26 2024-05-25 ocial Impact Assessment (ESI re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Cyohoha marshland RW-RAB-365916-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement ocial Impact Assessment (ESI IDA / 70840 Post Open - National 25,000.00 0.00 2023-07-17 2023-06-22 2023-08-07 2023-09-20 2023-10-18 2023-11-17 2023-12-22 2024-01-26 2024-05-25 re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Rwangingo Karangazi m arshland RW-RAB-365917-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Pending Impleme IDA / 70840 Post Open - National 30,000.00 0.00 2023-07-17 2023-08-07 2023-09-20 2023-10-18 2023-11-17 2023-12-22 2024-01-26 2024-05-25 ocial Impact Assessment (ESI re Development Based Selection ntation A) & Environmental and Soci al Management Plans (ESMPS ) for Gashora marshland RW-RAB-365920-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu Quality And Cost- Under Implement IDA / 70840 Post Open - National 30,000.00 0.00 2023-07-17 2023-06-22 2023-08-07 2023-09-20 2023-10-18 2023-11-17 2023-12-22 2024-01-26 2024-05-25 ocial Impact Assessment (ESI re Development Based Selection ation A) & Environmental and Soci al Management Plans (ESMPS ) for Nyarubogo marshland INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-RAB-322656-CS-INDV / Hiring individual consultant f Value Chain and Infrastructu Individual Consult Pending Impleme IDA / 70840 Post Open - National 5,000.00 0.00 2022-12-27 2023-02-14 2023-03-07 2023-04-11 2025-04-10 or training of Tender Commit re Development ant Selection ntation tee members and Contract M anagers Page 5 RW-RAB-328429-CS-QCBS / Hiring a consultancy firm for Value Chain and Infrastructu Under Implement IDA / 70840 Post Direct Selection Direct - National 236,250.00 0.00 2023-07-03 2023-03-16 2023-07-13 2023-09-16 2024-02-13 review of design study for Bu re Development ation garama marshland RW-RAB-328441-CS-QCBS / Hiring a consultancy firm for Value Chain and Infrastructu Under Implement IDA / 70840 Post Direct Selection Direct - National 150,000.00 0.00 2023-06-04 2023-05-03 2023-06-14 2023-08-18 2024-01-15 review of design study for Ka re Development ation rangazi - Rwangingo marshla nds RW-RAB-328446-CS-CDS / Hi ring a consultancy firm for re Value Chain and Infrastructu Under Implement IDA / 70840 Post Direct Selection Direct - National 48,000.00 0.00 2023-07-02 2023-04-27 2023-07-12 2023-09-15 2024-01-13 view of design study for Rub re Development ation uyenge - Burakari marshland s RW-RAB-328461-CS-CDS / Hi ring a consultancy firm to car ry out an Environmental Soci Value Chain and Infrastructu Pending Impleme al Impact Assessment (ESIA) IDA / 70840 Post Direct Selection Direct - National 70,400.00 0.00 2023-01-15 2023-01-25 2023-03-31 2023-08-28 re Development ntation & Environmental and Social Management Plans (ESMPs) f or Muvumba and Agasasa m arshlands RW-RAB-317871-CS-INDV / Value Chain and Infrastructu Individual Consult Open - Internationa Under Implement IDA / 70840 Post 288,000.00 0.00 2023-01-16 2023-02-16 2023-03-06 2023-03-27 2023-05-10 2026-12-20 Hiring an irrigation hydraulic re Development ant Selection l ation expert RW-RAB-328594-CS-INDV / Value Chain and Infrastructu Individual Consult Under Implement Hiring individual consultants IDA / 70840 Post Open - National 37,500.00 0.00 2023-01-16 2023-03-27 2023-03-06 2023-03-27 2023-05-01 2026-04-30 re Development ant Selection ation for Dam review panel (Geote chnical expert) RW-RAB-322618-CS-INDV / Value Chain and Infrastructu Individual Consult Under Implement Hiring individual consultant f IDA / 70840 Post Open - National 37,500.00 0.00 2023-01-16 2023-03-27 2023-03-06 2023-03-27 2023-05-01 2026-04-30 re Development ant Selection ation or Dam review panel (Dam e xpert) RW-RAB-336144-CS-INDV / Agricultural Finance and Ins Individual Consult Under Implement Hiring Individual Consultant f IDA / 70840 Post Open - National 20,000.00 0.00 2023-01-16 2023-03-27 2023-03-06 2023-03-27 2023-05-01 2026-04-30 urance ant Selection ation or dam review panel ( hydrol ogist expert) RW-RAB-347160-CS-INDV / Value Chain and Infrastructu Individual Consult Open - Internationa Hiring individual consultant f IDA / 70840 Post 192,000.00 0.00 Under Review 2023-04-30 2023-05-26 2023-06-18 2023-07-09 2023-08-13 2025-08-02 re Development ant Selection l or Environmental and social s afeguard expert RW-RAB-321519-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu IDA / 70840 Post Direct Selection Direct - National 17,500.00 0.00 Canceled 2023-02-15 2023-03-16 2023-02-25 2023-05-01 2023-08-29 ocial Impact Assessment (ESI re Development A) & Environmental and Soci al Management for Rubuyen ge - Burakari marshlands RW-RAB-321310-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu IDA / 70840 Post Direct Selection Direct - National 30,000.00 0.00 Canceled 2022-12-06 2023-03-16 2022-12-16 2023-02-19 2023-06-19 ocial Impact Assessment (ESI re Development A) & Environmental and Soci al Management Plans (ESMPS ) for Bakokwe marshland RW-RAB-321144-CS-QCBS / Hiring a Consultancy firm to carry out an Environmental S Value Chain and Infrastructu IDA / 70840 Post Direct Selection Direct - National 52,900.00 0.00 Canceled 2022-12-28 2023-03-16 2023-01-07 2023-03-13 2023-07-11 ocial Impact Assessment (ESI re Development A) & Environmental and Soci al Management Plans (ESMPS ) for Bugarama marshland Page 6 P# 147009 – Jiangxi Farm Produce Distribution System Development Project PP – January 2019 – June 2020 万万万万万万万万万 万万万万万万 Estimated 万万/万万 万 万万万万 Value 万万万万万万 万万 万万万万 Revie Estimated Contrac Estimated N 万万万万 Name of Contract 万万万万 Contract Description Procureme w Completio t Bidding o. 万万万万万 万万万万 nt Method (Prior/ n Date of Number Date RMB10,00 USD10,0 Post) Preliminar 0 00 y Design 52643.9 7585.5 万万 Total Costs 7 9 万万万万万万 Taihe County Sub-Project 8800.00 1268.01 、、、、、、、、、、、、、、、、、、、、 Civil Works of 、、、、、、、、、、、、、、、、、、、、、、、、、、、 New agricultural product TH-CW- Taihe County Agricultural Products 1 distribution platform, improve the agricultural products collection & 8800.00 1268.01 NCB 、、 Post 2019.10 2020.2 01 Comprehensive Trading Center distribution cold chain, warehousing and other civil works Construction Project 万万万万万万 Jing'an County Sub-Project 6216.46 895.74 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Comprehensive service building, internal road and site hardening, internal outdoor greening and environmental protection facilities, 、、、、、、、、、、、、、、、、 Civil works of agricultural product room temperature storage, market trading hall, 2 JA-CW-01 Jing'an County Agricultural Products 6216.46 895.74 NCB 、、 Post 2019.4 2019.8 market trading storefront, fee settlement, security and sanitation Comprehensive Trading Center management room, agricultural product low-temperature cold storage, gate, agricultural product processing workshop, internal outdoor water supply and drainage, power and fire protection facilities, fence 万万万万万万 Pengze County Sub-Project 9678.70 1394.63 、、、、、、、、 36000 、、、、、、、、、、、 500 、、、、、、、、、 600 、、、、、、、、 21600 、 、、、、、 1500 、、、、、、、、、、、、、、、、、、、、、、 90000 、、、、、、、、、、、、、、、 18000 、、、、、、、、、、、 3980 、、、、、、、、、、、、、、、、、、、、、36,000 square meters of new cotton standard warehouse; 500 square meters of security and management room; 600 square meters of 、、、、、、、、、、、、、、、、 Jiangxi Poyang PZ-CW- comprehensive service building;21600 square meters of internal 3 Lake Cotton Trading Center Construction 9678.70 1394.63 NCB 、、 Post 2019.5 2019.8 01 road;1500 meters of wall; one gate;90,000 square meters of internal Project outdoor water supply and drainage, power and fire facilities;18,000 square meters of internal outdoor greening and environmental protection facilities and 3,980 square meters of seed cotton warehouse and workshop (depending on the design plan, there may be some changes). 万万万万万万万万万 Jiujiang Economic Development Zone Sub-Project 9679.91 1394.80 、、、、、、、、、、、、 Civil Works of 、、、、、、、、、、、、、、、、、、、、、、、、、、 New aquatic products JJJK-CW- 4 Poyang Lake Jiujiang Aquatic products collection &distribution platform; perfect aquatic product collection 9679.91 1394.80 NCB 、、 Post 2019.11 2019.12 01 City &distribution cold chain, warehousing and other civil works 万万万万万万 Huichang County Sub-Project 6002.35 864.89 、、、、、、、、、、、、、、、、、、、、、、、、、、 New agricultural products 、、、、、、、、、、、、、、、、、、、 Civil Works of HC-CW- collection &distribution platform; perfect agricultural product 5 Huichang County Modern Agricultural 6002.35 864.89 NCB 、、 Post 2019.1 2019.5 01 collection &distribution cold chain, warehousing and other civil Products Cold Chain Logistics Center works 万万万万万万 Longnan County Sub-Project 6115.00 881.12 、、、、、、、、、、、、、、、、、、、、、、、、、、 New agricultural products 、、、、、、、、、、、、、、、、、、 Civil Works of LN-CW- collection &distribution platform; perfect agricultural product 6 Longnan County Agricultural Products 6115.00 881.12 NCB 、、 Post 2019.8 2019.12 01 collection &distribution cold chain, warehousing and other civil Trading Center Construction Project works 万万万万万万万万万 Pingxiang Anyuan District Sub-Project 2000.00 288.18 、、、、、、、、、、、、、、、、、、、、、、、、、、 New agricultural products 、、、、、、、、、、、、、、、、、、 Civil Works of AY-CW- collection &distribution platform; perfect agricultural product 7 Anyuan District Agricultural Products 2000.00 288.18 NCB 、、 Post 2019.10 2020.1 01 collection &distribution cold chain, warehousing and other civil Trading Center Construction Project works 万万万万万万 Yushan County Sub-Project 4151.55 598.21 、、 2 、、、、 394 、、、、、、、、、 14250 、、、、、、、、、、、、、 2671.41 、、、、、、、、、、 、、、、、、、、、 8904.7 、、、、、、、、、、、、、、、 1780.94 、、、、 2 gates, 394 linear meters of wall, 14250 square meters of storage and transfer 、、、、、、、、、、、、、、 Civil Works of YS-CW- warehouse, 2,671.41 square meters of internal road and site 8 Yushan County New Logistics 2772.34 399.47 NCB 、、 Post 2018.11 2019.3 01 hardening, 8904.7 square meters of internal outdoor water supply Distribution Area and drainage, power and fire protection facilities, and 1780.94 square meters of internal outdoor greening and environmental protection facilities. 、、 2 、、、、、、、、、、、、、、、、、 60 、、、、、、 309 、、、、、、、、、、、、、2000 、、、、、、 、、、 2000 、、、、、、、、、、、、、 4046.4 、、、、、、、、、、、、、、、、、、、 16860.08 、、 、、、、、、、、、、、、、 3372.02 、、、、2 gates, 60 square meters of room for 、、、、、、、、、、、、、、、、、、、 Civil Works for fee settlement, security and sanitation management; 309 linear the Upgrade and Reconstruction of meters of wall, 2000 square meters of new market trading YS-CW- 9 Yushan County Existing Fruit and frontstore, 2000 square meters of comprehensive service building, 1379.21 198.73 NCB 、、 Post 2019.5 2019.10 02 Vegetable Collection & Distribution and 4046.4 square meters of internal road and site hardening; Platform 16,860.08 square meters of internal outdoor water supply and drainage, power and fire protection facilities, and 3372.02 square meters of internal outdoor greening and environmental protection facilities. 万万万万万万万万万 万万万万 万万万万万万 Estimated 万 万万万万 万万 Value 万万万万 万万/万万 万万 Contrac Estimated Estimat 万万万万 Name of Procurem Review No t 万万万万 Contract Description Completion ed Contract ent (Prior/ . Numbe 万万万万万 万万万万 Date of Bidding Method Post) r RMB10,0 USD10,0 Preliminary Date 00 00 Design 3976.9 万万 573.04 1 万万万万万万 Taihe County Sub-Project 3.40 0.49 、、、、、、、、、、、、、、、、、 Office 、 1 、、、、 2 、、、、、、、、、、、、、、、、、、、 Office equipments TH-EP- Equipment Procurement of Taihe 1 for a new and two existing farmers' professional 3.40 0.49 Shopping 、、 Post 2019.10 01 County Farmers' Professional cooperatives organizations. Cooperative Organizations 万万万万万万 Jing'an County Sub-Project 355.80 51.27 、、、、、、、、、、、、、、、、、 Office 、 3 、、、、 6 、、、、、、、、、、、、、、、、、、、 Office equipments Equipment Procurement of Jing'an 2 JA-EP-01 for three new and six existing farmers' professional 10.20 1.47 Shopping 、、 Post 2019.9 County Farmers' Professional cooperatives organizations. Cooperative Organizations 、、、、、、、、、、、、、、、、、、、、、、、、、、、 80%、、、 4 、、、、 、、、、、、、、、、、、、 Low-temperature Cold 9600 、、、 Including combined library, refrigeration 3 JA-EP-02 Storage Equipment Procurement in and control equipment, and cold storage doors, etc., 345.60 49.80 Shopping 、、 Post 2019.9 Jing'an County according to the cold storage area of 80%, height 4 meters, a total of 9600 cubic meters. 万万万万万万 Pengze County Sub-Project 8.00 1.15 、、、、、、、、、、、、、、、、、 Office 、 3 、、、、 10 、、、、、、、、、、、、、、、、、、、 Office equipments PZ-EP- Equipment Procurement of Pengze 4 for three new and ten existing farmers' professional 8.00 1.15 Shopping 、、 Post 2019.8 01 County Farmers' Professional cooperatives organizations. Cooperative Organizations 万万万万万万万万万 Jiujiang Economic Development Zone Sub-Project 0.80 0.12 、、、、、、、、、、、、、、、、、、、 Office 、 1 、、、、、、、、、、、、、、、、、、、 Office equipments for JJJK-EP- Equipment Procurement of Jiujiang 5 an existing fishermen's professional cooperatives 0.80 0.12 Shopping 、、 Post 2019.8 01 Economic Development Zone Fishers' organization. Professional Cooperative Organizations 万万万万万万 Huichang County Sub-Project 2842.14 409.53 、、、、、、、、、、、、、、、、、 Office 、 3 、、、、 10 、、、、、、、、、、、、、、、、、、、 Office HC-EP- Equipment Procurement of Huichang 6 equipments for three new and ten existing farmers' 8.00 1.15 Shopping 、、 Post 2019.10 01 County Farmers' Professional professional cooperatives organizations. Cooperative Organizations 、、、、、、、、、、、、、、、 Market 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Refrigeration HC-EP- Refrigeration System Engineering system engineering of agricultural products ultra-low 7 1407.40 202.80 NCB 、、 Post 2019.5 02 Equipment Procurement in Huichang temperature freezer, and refrigeration system County engineering of agricultural products. 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Agricultural 、、、、、、、、、、、、、、 Market Insulation product ultra-low temperature freezer insulation HC-EP- 8 Layer Engineering Equipment project, and insulation layer project of low 1434.74 206.73 NCB 、、 Post 2019.5 03 Procurement in Huichang County temperature refrigeration storage for agricultural products. 万万万万万万 Longnan County Sub-Project 10.20 1.47 、、、、、、、、、、、、、、、、、 Office 、 3 、、、、 6 、、、、、、、、、、、、、、、、、、、、、、、、 Office LN-EP- Equipment Procurement of Longnan equipments for three new and six existing farmers' 9 10.20 1.47 Shopping 、、 Post 2019.8 01 County Farmers' Professional professional cooperatives organizations and family Cooperative Organizations farms. 万万万万万万万万万 Pingxiang Anyuan District Sub-Project 6.00 0.86 、、、、、、、、、、、、、、、、、 Office 、 2 、、、、 3 、、、、、、、、、、、、、、、、、、、 Office equipments AY-EP- Equipment Procurement of Anyuan 10 for two new and three existing farmers' professional 6.00 0.86 Shopping 、、 Post 2019.8 01 District Farmers' Professional cooperatives organizations. Cooperative Organizations 万万万万万万 Yushan County Sub-Project 750.57 108.15 、、、、、、、、、、、、、、、、、 Office 、 2 、、、、 6 、、、、、、、、、、、、、、、、、、 Office equipments YS-EP- Equipment Procurement of Yushan 11 for two new and six existing farmers' professional 8.40 1.21 Shopping 、、 Post 2019.10 01 County Farmers' Professional cooperatives organizations. Cooperative Organizations 、、、、、、、、、、、 Market Office 、、 58 、、、、、、、、、 115 、、、、、 113 、 58 air YS-EP- 12 Equipment Procurement in Yushan conditioners, 115 computers and peripheral 120.45 17.36 Shopping 、、 Post 2019.10 02 County equipment, 113 sets of tables and chairs 、、、、、、、、、、、、 1 、、、、、、、、、、 1 、、、、 1 、、、、、、、、、、、、 、、 2 、、、、、、、、、、、、 1 、、、、、、、 4 、 1 set of agricultural product quality safety monitoring station equipment, 、、、、、、、、、 Market YS-EP- 1 set of low temperature refrigerating and fresh- 13 Equipment Procurement in Yushan 554.32 79.87 NCB 、、 Post 2019.10 03 keeping equipment, 1 platform scale, 2 sets of County storage, transshipment, transshipment and metering equipment, 1 set of processing, sorting and packaging equipment, 4 forklifts for warehouse. 、、、、、、、、、、、、、、、、、、、 Agricultural 、、、、、、、、、、、 137 、、、、 LED 、、、、、 2 、 137 sets of YS-EP- Product Distribution Electronic 14 agricultural product traceability QR code printer, 2 67.40 9.71 Shopping 、、 Post 2019.10 04 Information System Equipment large LED electronic display Procurement of Yushan County 万万万万万万 Estimated Value 万万/万万 万万万万万万万万万万 万万万万 万万 万万万万 Revie Estimated 万万万万 Estimat 万万 万万万万 Name Procurem w Completion Contract 万万万万 Contract Description ed No. of Contract 万万万万万 万万万万 ent (Prior Date of Number Bidding RMB10,00 USD10,0 Method / Preliminary Date 0 00 Post) Design 万万 Total Costs 1047.60 139.59 万万万万万万 Taihe County Sub-Project 174.00 25.07 、、、、、、、、、 Taihe 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a legal counsel to 、、 1 TH-SP-01 County Legal Affairs 12.00 1.73 IC 2019.10 2019.11 provide legal advice to farmers' cooperatives, etc. Post Consultant 、、、、、、、、、 Taihe 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a financial 、、 2 TH-SP-02 County Financial management consultant to provide financial 12.00 1.73 IC 2019.10 2019.11 Post management consultant management services for farmers' cooperatives, etc. 、、、、、、、、、、、、、 Taihe 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Hire two County Market market development and management coordinators to 、、 3 TH-SP-03 Development and 50.00 7.20 IC 2019.10 2019.11 provide business, planning, design and marketing Post Management strategy guidance for farmers' cooperatives. Coordinator 、、、、、、、、、、、、、、、、 Taihe County Market 、、、、、、、、、、、、、、、、、、、 Planning and consulting services 、、 4 TH-SP-04 Construction and 100.00 14.41 CQS 2019.10 2019.11 for market construction and operations management. Post Operation Support Consulting Service 万万万万万万 Jing'an County Sub-Project 84.00 12.13 、、、、、、、、、 Jing'an 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a legal counsel to 、、 5 JA-SP-01 County Legal Affairs 12.00 1.73 IC 2019.2 2019.3 provide legal advice to farmers' cooperatives, etc. Post Consultant 、、、、、、、、、 Jing'an 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a financial 、、 6 JA-SP-02 County Financial management consultant to provide financial 12.00 1.73 IC 2019.2 2019.3 Post Management Consultant management services for farmers' cooperatives, etc. 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 、、、、、、 Farmer cooperatives production skills and 、、、、、、、、、、 Jing'an agricultural technology extension training, quality and 、、 7 JA-SP-03 County Farmer 60.00 8.67 CQS 2019.2 2019.3 safety training in agricultural production links, Post Cooperative Training cooperative management, brand marketing and related financial and legal training. 万万万万万万 Pengze County Sub-Project 119.60 17.23 、、、、、、、、、 Pengze 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a financial 、、 8 PZ-SP-01 County Financial management consultant to provide financial 4.80 0.69 IC 2019.5 2019.8 Post Management Consultant management services for farmers' cooperatives, etc. 、、、、、、、、、 Pengze 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a legal counsel to 、、 9 PZ-SP-02 County Legal Affairs 4.80 0.69 IC 2019.5 2019.8 provide legal advice to farmers' cooperatives, etc. Post Consultant 、、、、、、、、、、、、、、、、 Pengze County Market 、、、、、、、、、、、、、、、、、、 Provide technical advisory services 、、 10 PZ-SP-03 Construction and 100.00 14.41 CQS 2019.4 2019.7 to market construction and operations Post Operation Support Consulting Service 、、、、、、、、、、、、、 Pengze 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a County Market market development and management coordinators to 、、 11 PZ-SP-04 Development and 10.00 1.44 IC 2019.5 2019.8 provide business, planning, design and marketing Post Management strategy guidance for farmers' cooperatives. Coordinator 万万万万万万万万万 Jiujiang Economic Development Zone Sub-Project 174.00 25.07 、、、、、、、、、、、 Jiujiang Economic Development 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a legal counsel to 、、 12 JJJK-SP-01 12.00 1.73 IC 2019.9 2019.10 Zone Legal Affairs provide legal advice to farmers' cooperatives, etc. Post Consultant 、、、、、、、、、、、 Jiujiang 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a financial Economic Development 、、 13 JJJK-SP-02 management consultant to provide financial 12.00 1.73 IC 2019.9 2019.10 Zone Financial Post management services for farmers' cooperatives, etc. Management Consultant 、、、、、、、、、、、、、、、 Jiujiang Economic 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Hire two Development Zone market development and management coordinators to 、、 14 JJJK-SP-03 50.00 7.20 IC 2019.9 2019.10 Market Development provide business, planning, design and marketing Post and Management strategy guidance for farmers' cooperatives. Coordinator 、、、、、、、、、、、、、、、、、、 Jiujiang Economic Development Zone 、、、、、、、、、、、、、、、、、、 Provide technical 、、 15 JJJK-SP-04 100.00 14.41 CQS 2019.9 2019.10 Market Construction and advisory services to market construction and operations. Post Operation Support Consulting Service 万万万万万万 Huichang County Sub-Project 49.00 7.06 、、、、、、、、、 Huichang 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a legal counsel to 、、 16 HC-SP-01 County Legal Affairs 12.00 1.73 IC 2019.2 2019.3 provide legal advice to farmers' cooperatives, etc. Post Consultant 、、、、、、、、、 Huichang 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a financial 、、 17 HC-SP-02 County Financial management consultant to provide financial 12.00 1.73 IC 2019.2 2019.3 Post Management Consultant management services for farmers' cooperatives, etc. 、、、、、、、、、、、、、 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a Huichang County Market market development and management coordinators to 、、 18 HC-SP-03 Development and 25.00 3.60 IC 2019.2 2019.3 provide business, planning, design and marketing Post Management strategy guidance for farmers' cooperatives. Coordinator 万万万万万万 Longnan County Sub-Project 74.00 10.66 、、、、、、、、、 Longnan 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a legal counsel to 、、 19 LN-SP-01 County Legal Affairs 12.00 1.73 IC 2019.10 2019.12 provide legal advice to farmers' cooperatives, etc. Post Consultant 、、、、、、、、、 Longnan 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a financial 、、 20 LN-SP-02 County Financial management consultant to provide financial 12.00 1.73 IC 2019.10 2019.12 Post Management Consultant management services for farmers' cooperatives, etc. 、、、、、、、、、、、、、 Longnan 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Hire two County Market market development and management coordinators to 、、 21 LN-SP-03 Development and 50.00 7.20 IC 2019.10 2019.12 provide business, planning, design and marketing Post Management strategy guidance for farmers' cooperatives. Coordinator 万万万万万万万万万 Pingxiang Anyuan District Sub-Project 49.00 7.06 、、、、、、、、、 Anyuan 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a legal counsel to 、、 22 AY-SP-01 District Legal Affairs 12.00 1.73 IC 2019.6 2019.8 provide legal advice to farmers' cooperatives, etc. Post Consultant 、、、、、、、、、 Anyuan 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a financial 、、 23 AY-SP-02 District Financial management consultant to provide financial 12.00 1.73 IC 2019.6 2019.8 Post Management Consultant management services for farmers' cooperatives, etc. 、、、、、、、、、、、、、 Anyuan 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a District Market market development and management coordinators to 、、 24 AY-SP-03 Development and 25.00 3.60 IC 2019.6 2019.8 provide business, planning, design and marketing Post Management strategy guidance for farmers' cooperatives. Coordinator 万万万万万万 Yushan County Sub-Project 74.00 10.66 、、、、、、、、、 Yushan 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a legal counsel to 、、 25 YS-SP-01 County Legal Affairs 12.00 1.73 IC 2019.6 2019.7 provide legal advice to farmers' cooperatives, etc. Post Consultant 、、、、、、、、、 Yushan 、、、、、、、、、、、、、、、、、、、、、、、、、 Hire a financial 、、 26 YS-SP-02 County Financial management consultant to provide financial 12.00 1.73 IC 2019.6 2019.7 Post Management Consultant management services for farmers' cooperatives, etc. 、、、、、、、、、、、、、 Yushan 、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、、 Hire two County Market market development and management coordinators to 、、 27 YS-SP-03 Development and 50.00 7.20 IC 2019.6 2019.7 provide business, planning, design and marketing Post Management strategy guidance for farmers' cooperatives. Coordinator 万万万万 PPMO 250.00 24.64 、、、、、、、 Project SXMB-SP- 、、、、、、、、、、、、 Project baseline survey, 、、 28 Monitoring and 60.00 5.80 CQS 2019.1 2019.1 01 monitoring and evaluation Post Evaluation 、、、、、、、、、 SXMB-SP- Environmental 、、、、、、、、、、、 Environmental monitoring 、、 29 120.00 8.70 CQS 2019.1 2019.1 02 Monitoring Plan and plan and management Post Management 、、、、、、、、、、、、、、 Special Research on 、、、、、、、、、、、、、、、、、、、 Special Research on SXMB-SP- 、、 30 Financing of Agricultural Financing of Agricultural Products Distribution Value 30.00 4.35 CQS 2019.5 2019.5 03 Post Products Distribution Chain Value Chain 、、、、、、、、、、、、、 Development Plan for SXMB-SP- 、、、、、、、、、、、、、、、、、、 Development plan for the 、、 31 the Provincial 40.00 5.80 CQS 2019.8 2019.8 04 provincial agricultural product circulation system Post Agricultural Product Distribution System PROCUREMENT China : Jiangxi Farm Produce Distribution System Development PLAN General Information Country: China 2019-01-07 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P147009 GPN Date: 2018-05-26 Project Name: Jiangxi Farm Produce Distribution System Development Loan / Credit No: IBRD / 88000 Jiangxi Rural Dev. PMO Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned YS-CW-01 / Civil Works of Y Component 2: Improving Dis Single Stage - One E Under Imple 2019-12-2 ushan County New Logistics IBRD / 88000 Post Request for Bids Open - National 399.47 0.00 2019-03-04 2019-02-20 2019-03-09 2019-03-12 2019-04-20 2019-04-11 2019-05-20 2019-06-24 tribution Logistics nvelope mentation 1 Distribution Area PZ-CW-01 / Jiangxi Poyang L Component 2: Improving Dis Single Stage - One E 13,946,300.0 Under Imple 2020-05-1 ake Cotton Trading Center C IBRD / 88000 Post Request for Bids Open - National 0.00 2019-08-01 2020-08-27 2019-08-06 2019-09-17 2019-10-17 2019-11-21 tribution Logistics nvelope 0 mentation 9 onstruction Project TH-CW-01 / Civil Works of Ta ihe County Agricultural Produ Component 2: Improving Dis Single Stage - One E 12,680,100.0 Under Imple 2020-11-2 IBRD / 88000 Post Request for Bids Open - National 0.00 2020-02-03 2022-04-18 2020-02-08 2020-03-21 2022-06-02 2020-04-20 2022-06-02 2020-05-25 cts Comprehensive Trading C tribution Logistics nvelope 0 mentation 1 enter Construction Project JA-CW-01 / Civil works of Jing Component 2: Improving Dis Single Stage - One E 8,094,751.6 2020-05-1 'an County Agricultural Produ IBRD / 88000 Post Request for Bids Open - National 8,957,400.00 Signed 2019-08-01 2022-05-27 2019-08-06 2019-09-17 2020-08-28 2019-10-17 2020-08-28 2019-11-21 2020-09-30 tribution Logistics nvelope 7 9 cts Comprehensive Trading C enter HC-CW-01 / Civil Works of H Component 2: Improving Dis Single Stage - One E 7,863,074.9 2020-02-2 uichang County Modern Agric IBRD / 88000 Post Request for Bids Open - National 8,648,900.00 Signed 2019-05-06 2020-01-22 2019-05-11 2019-06-22 2020-04-24 2019-07-22 2020-04-08 2019-08-26 2020-08-08 tribution Logistics nvelope 4 2 ultural Products Cold Chain L ogistics Center LN-CW-01 / Civil Works of L Component 2: Improving Dis Single Stage - One E 11,154,198. 2020-09-1 ongnan County Agricultural P IBRD / 88000 Post Request for Bids Open - National 8,811,200.00 Signed 2019-12-02 2021-12-17 2019-12-07 2020-01-18 2022-01-20 2020-02-17 2022-05-06 2020-03-23 2022-03-15 tribution Logistics nvelope 35 9 roducts Trading Center Const ruction Project AY-CW-01 / Civil Works of A Component 2: Improving Dis Single Stage - One E 2020-10-2 nyuan District Agricultural Pr IBRD / 88000 Post Request for Bids Open - National 8,213,256.48 0.00 Canceled 2020-01-02 2020-01-07 2020-02-18 2020-03-19 2020-04-23 tribution Logistics nvelope 0 oducts Trading Center Constr uction Project National Procure AY-CW-001 / QingShan Town ment Document - Component 2: Improving Dis Single Stage - One E 2022-10-2 new farmer's market IBRD / 88000 Post Request for Bids Open - National 1 Envelope proce 9,705,969.94 0.00 Signed 2022-01-07 2022-03-16 2022-01-12 2022-02-23 2022-05-12 2022-03-25 2022-05-12 2022-04-29 tribution Logistics nvelope 6 R q G ° ú œ 8 : ss (Non Bank-SPD ) National Procure AY-CW-002 / New farmers m ment Document - Component 2: Improving Dis Single Stage - One E 2022-10-2 arket Bai Yuan street IBRD / 88000 Post Request for Bids Open - National 1 Envelope proce 7,435,402.72 0.00 Signed 2022-01-07 2022-03-28 2022-01-12 2022-02-23 2022-05-12 2022-03-25 2022-05-12 2022-04-29 tribution Logistics nvelope 6 } • W ° ú œ 8 : ss (Non Bank-SPD ) JJJK-CW-001 / Jiujiang poyang Request for Bids - lake aquatic city project cons Component 2: Improving Dis Single Stage - One E Small Works SPD 14,743,215.7 2022-12-1 IBRD / 88000 Post Request for Bids Open - National 0.00 Canceled 2022-02-22 2022-02-27 2022-04-10 2022-05-10 2022-06-14 truction contract 1 3 V ] _ 4 § tribution Logistics nvelope (1 envelope proce 2 1 Î y î ú ss) JJJK-CW-01 / Civil Works of P Component 2: Improving Dis Single Stage - One E 13,948,000.0 2020-09-1 IBRD / 88000 Post Request for Bids Open - National 0.00 Canceled 2019-12-02 2022-03-02 2019-12-07 2020-01-18 2020-02-17 2020-03-23 oyang Lake Jiujiang Aquatic p tribution Logistics nvelope 0 9 roducts City JJJK-CW-01A / Aquatic produc ts trade exhibition center of 49.2549 million yuan, normal temperature repository of aq Component 2: Improving Dis 29,936,601.8 2022-12-2 IBRD / 88000 Prior Request for Bids 0.00 Signed 2022-03-04 2022-04-13 2022-03-09 2022-04-20 2022-06-16 2022-05-20 2022-08-03 2022-06-24 uatic products was 29.8609 tribution Logistics 9 1 million yuan, low temperatur e cold storage of fresh of aqu atic products was 19.1547 mi llion yuan, the basement of 7 1.2278 milli YS-CW-02 / Civil Works for th e Upgrade and Reconstructio Component 2: Improving Dis Single Stage - One E 2020-12-1 n of Yushan County Existing IBRD / 88000 Post Request for Bids Open - National 1,987,334.29 0.00 Canceled 2019-10-08 2019-10-13 2019-11-24 2019-12-24 2020-06-16 tribution Logistics nvelope 3 Fruit and Vegetable Collectio n & Distribution Platform LN-CW-02 / Longnan city agr National Procure icultural products trading cen ment Document - ter road, Pipe Network, green Component 2: Improving Dis Single Stage - One E Under Imple 2024-01-2 IBRD / 88000 Post Request for Bids Open - National 1 Envelope proce 2,163,770.00 0.00 2023-04-06 2023-05-18 2023-04-11 2023-05-23 2023-06-20 2023-06-22 2023-07-27 ing and other projects of the tribution Logistics nvelope mentation 3 ss (Non Bank-SPD construction drawings and th ) e entire list of the project vol ume GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual YS-GD-04 / Agricultural Prod uct Distribution Electronic Inf Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 97,100.00 0.00 2019-10-13 2019-12-08 2020-01-07 ormation System Equipment tribution Logistics tions nvelope ementation Procurement of Yushan Coun ty YS-GD-03 / Market Equipme Component 2: Improving Dis Single Stage - One E Pending Impl IBRD / 88000 Post Request for Bids Open - National 798,700.00 0.00 2019-10-08 2019-10-13 2019-11-24 2019-12-24 2020-01-28 2020-03-28 nt Procurement in Yushan Co tribution Logistics nvelope ementation unty YS-GD-02 / Market Office Eq Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 173,600.00 0.00 2019-10-13 2019-12-08 2020-01-07 uipment Procurement in Yus tribution Logistics tions nvelope ementation han County YS-GD-01 / Office Equipment Procurement of Yushan Cou Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 12,100.00 0.00 2019-10-13 2019-12-08 2020-01-07 nty Farmers' Professional Co production logistics tions nvelope ementation operative Organizations Page 1 LN-GD-01 / Office Equipment Procurement of Longnan Co Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 14,700.00 0.00 2019-08-06 2019-10-01 2019-10-31 unty Farmers' Professional C production logistics tions nvelope ementation ooperative Organizations JJJK-GD-01 / Office Equipmen t Procurement of Jiujiang Eco Component 1: Strengthening Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 1,200.00 0.00 Canceled 2019-08-06 2019-10-01 2019-10-31 nomic Development Zone Fis production logistics tions nvelope hers' Professional Cooperati ve Organizations PZ-GD-01 / Office Equipment Procurement of Pengze Cou Component 1: Strengthening Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 11,500.00 9,347.43 Signed 2019-08-06 2019-10-01 2021-12-26 2019-10-31 nty Farmers' Professional Co production logistics tions nvelope operative Organizations JA-GD-01 / Office Equipment Procurement of Jing'an Coun Component 1: Strengthening Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 14,700.00 0.00 Signed 2019-09-07 2019-11-02 2019-12-02 ty Farmers' Professional Coo production logistics tions nvelope perative Organizations TH-GD-01 / Office Equipment Procurement of Taihe Count Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 4,900.00 0.00 2019-10-13 2019-12-08 2020-01-07 y Farmers' Professional Coop production logistics tions nvelope ementation erative Organizations HC-GD-02 / Market Refrigera Component 2: Improving Dis tion System Engineering Equi IBRD / 88000 Post Request for Bids 2,027,953.89 0.00 Canceled 2019-05-06 2019-05-11 2019-06-22 2019-07-22 2019-08-26 2019-10-25 tribution Logistics pment Procurement in Huich ang County HC-GD-03 / Market Insulatio Component 2: Improving Dis Single Stage - One E n Layer Engineering Equipme IBRD / 88000 Post Request for Bids Open - National 3,026,426.51 0.00 Canceled 2019-05-06 2019-05-11 2019-06-22 2019-07-22 2019-08-26 2019-10-25 tribution Logistics nvelope nt Procurement in Huichang County YS-EP-01 / ‰ q ¿ œ \ Ä Ç ž Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 31,700.29 0.00 2021-08-06 2021-09-24 2022-03-23 l ¾ Ç - production logistics tions nvelope ementation Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl JA-EP-02 / z IBRD / 88000 Post Open - National 43,227.67 0.00 2021-11-06 2022-01-01 2022-06-30 tribution Logistics tions nvelope ementation JA-EP-01 / V ‰ ¿ œ \ > ž l Component 1: Strengthening Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 15,561.96 0.00 Signed 2021-04-09 2021-06-04 2021-12-01 ¾ Ç - production logistics tions nvelope HC-EP-02A / Market Refriger ation System Engineering Eq uipment Procurement in Huic hang County Component 2: Improving Dis Single Stage - One E IBRD / 88000 Prior Request for Bids Open - National 5,054,400.00 5,505,626.12 Signed 2021-12-26 2022-01-03 2021-12-31 2022-02-11 2022-03-22 2022-03-13 2022-04-11 2022-04-17 2022-06-03 2022-10-14 Refrigeration system enginee tribution Logistics nvelope ring of agricultural products ultra-low temperature freeze r, and refrigeration system e ngineering of agricultura JA-EP-03 / Warehouse with fo rklift Project part B buy warehouse Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl forklift, a total of 4, 800000 y IBRD / 88000 Post Open - National 125,513.82 0.00 2022-01-11 2022-03-08 2022-09-04 tribution Logistics tions nvelope ementation uan. Ó “ ( É f y î Bè - p Ó “ ( É f q ¡ 4† 80 C JA-EP-04 / loadometer Project part B buy loadomete r, a total of 2, 600000 yuan. Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 94,135.37 0.00 2022-01-11 2022-03-08 2022-09-04 tribution Logistics tions nvelope ementation 0 Å y î Bè - p 0 Å q ¡ 2ð 60 C JA-EP-05 / Large LED electro nic display screen Project part B buy large LED electronic display screen, a t otal of two pieces of 400000 yuan, an open-air set up, a pi IBRD / 88000 Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl Post Open - National 62,756.91 0.00 2022-01-11 2022-03-08 2022-09-04 ece in a complex building. tribution Logistics tions nvelope ementation ' ‹ LED5 P > : O y î Bè - p ' ‹ LED5 P > : O q ¡ $ W 40 C W 2 ) ¾ n W ( ü | … AY-GD-01 / Office Equipment Procurement of Anyuan Distr Component 1: Strengthening Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 8,600.00 0.00 Canceled 2019-08-06 2019-10-01 2019-10-31 ict Farmers' Professional Coo production logistics tions nvelope perative Organizations AY-EP-01 / Support the farm er cooperative organization s et up and improve the office Component 2: Improving Dis Request for Quota Single Stage - One E furniture: IBRD / 88000 Post Open - National 6,315.32 5,252.43 Signed 2022-02-21 2022-04-18 2022-05-01 2022-10-15 tribution Logistics tions nvelope Office furniture: 1, filing cabi nets, 19 group (metal cabine t); 2, desk in 19 (1.4 m); 3, of fice chair in 19 (leather). PZ-EP-06 / Cotton market sc Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl ale load 2 sets.É ± ¤ : 0 Å 2 IBRD / 88000 Post Open - National 94,888.66 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation ð PZ-EP-09 / É ± ¤ : Æ É “ ¢ f ¥ û ß 21W Cotton market sta Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 166,055.16 0.00 2022-02-26 2022-04-23 2022-10-20 ndard cotton library 21 sets o tribution Logistics tions nvelope ementation f infrared alarm system. PZ-EP-10 / É ± ¤ : Ó “ ( É f 6 Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl ð The cotton market wareho IBRD / 88000 Post Open - National 284,665.99 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation use with 6 forklift trucks. PZ-EP-11 / Cotton market off ice building office equipment Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 47,444.33 0.00 2022-02-26 2022-04-23 2022-10-20 (50 air conditioner).É ± ¤ : tribution Logistics tions nvelope ementation ž l ' | ž l ¾ 50ð z PZ-EP-12 / É ± ¤ : ž l ' | ž l ¾ 5 Ê h ¹ ¾ 100ð Cotto Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl n market office building offic IBRD / 88000 Post Open - National 71,175.50 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation e equipment (computers and peripheral equipment 100). Page 2 PZ-EP-13 / É ± ¤ : ž l ' | ž l ¶ w 100W L Ü Cotton mar Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 47,450.34 0.00 2022-02-26 2022-04-23 2022-10-20 ket office building office furni tribution Logistics tions nvelope ementation ture (100 sets of ark of desk and chair). PZ-EP-07 / Improve farmers' professional co-operatives se rvice capacity (desktop comp Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 28,470.20 0.00 2022-02-26 2022-04-23 2022-10-20 uter, notebook computer, pri tribution Logistics tions nvelope ementation nter) 9 „ Ð G œ \ > ¡ ý › ð 5 ° , 5 S p : PZ-EP-08 / Improve farmers' professional co-operatives se rvice capacity (desk, chair, ta IBRD / 88000 Component 2: Improving Dis Request for Quota Single Stage - One E Post Open - National 18,980.13 6,092.93 Signed 2022-02-26 2022-04-23 2021-12-18 2022-10-20 ble, metal cabinet, sofa) 9 „ tribution Logistics tions nvelope Ð G œ \ > ¡ ý › ž l L P ® L Á ® Ü ™ Ñ AY-EP-002 / QingShan Town Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl farmers' markets (air conditi IBRD / 88000 Post Open - National 80,608.20 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation oning).R q G œ 8 : z AY-EP-004 / Table, chair, cab Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl inet QingShan Town a farmer IBRD / 88000 Post Open - National 80,567.45 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation s' market R q G œ 8 : L P P Ü P AY-EP-005 / The quality and safety of agricultural product Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl s monitoring station equipme IBRD / 88000 Post Open - National 78,987.69 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation nt QingShan Town a farmers' market.R q G œ 8 : œ § Á ( Ï ‰ h Ñ K Ù ¾ AY-EP-006 / Loadometer Qin Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl gShan Town a farmers' mark IBRD / 88000 Post Open - National 94,785.23 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation et.R q G œ 8 : 0 Å AY-EP-008 / QingShan Town Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl cold chain storage and transf IBRD / 88000 Post Open - National 126,380.31 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation er.R q G · þ Ó ¨ ' ¯ AY-EP-010 / The farmer's ma Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl rket air conditioning Bai Yuan IBRD / 88000 Post Open - National 67,297.52 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation street.} • W œ 8 : z AY-EP-011 / Bai Yuan street, a farmers' market computers Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 101,657.16 0.00 2022-02-26 2022-04-23 2022-10-20 and peripheral equipment tribution Logistics tions nvelope ementation .} • W œ 8 : 5 Ê h ¹ ¾ AY-EP-012 / Table, chair, cab Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl inet Bai Yuan street farmer's IBRD / 88000 Post Open - National 67,771.44 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation market.} • W œ 8 : L P P Ü P AY-EP-013 / The quality and safety of agricultural product s monitoring station equipme Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 78,987.69 0.00 2022-02-26 2022-04-23 2022-10-20 nt Bai Yuan street farmer's m tribution Logistics tions nvelope ementation arket. } • W œ 8 : œ § Á ( Ï ‰ h Ñ K Ù ¾ AY-EP-014 / Bai Yuan street cold chain storage and low te Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl mperature cold storage pres IBRD / 88000 Post Open - National 70,055.44 0.00 2022-02-26 2022-04-23 2022-10-20 tribution Logistics tions nvelope ementation ervation equipment.} • W · þ Ó ¨ N ) · Ï Ý œ ¾ AY-EP-015 / Market informati on system of agricultural pro Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 53,706.54 0.00 2022-02-26 2022-04-23 2022-10-20 ducts traceability qr code co tribution Logistics tions nvelope ementation de : á o û ß œ § Á ¯ • Œ ô S h AY-EP-016 / Large LED electr onic display market informati Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 63,184.17 0.00 2022-02-26 2022-04-23 2022-10-20 on system. : á o û ß ' ‹ LED tribution Logistics tions nvelope ementation 5 P > : O LN-EP-01 / Support new and existing cooperative and fam ily farm office equipment pur Component 2: Improving Dis Request for Quota Single Stage - One E Under Imple IBRD / 88000 Post Open - National 8,688.25 0.00 2022-02-27 2022-04-24 2022-10-21 chasing. Office desks and ch tribution Logistics tions nvelope mentation airs v ° ú ò \ > Ê ¶ - œ : ž l ¾ „ Ç - ž l L LN-EP-02 / Support new and existing cooperative and fam Component 2: Improving Dis Request for Quota Single Stage - One E ily farm office equipment (co IBRD / 88000 Post Open - National 12,947.08 11,565.16 Signed 2022-02-27 2022-04-24 2020-09-20 2022-10-21 tribution Logistics tions nvelope mputer printer). v ° ú ò \ > Ê ¶ - œ : ž l ¾ 5 S p : JA-EP-07 / Computer and per Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl ipheral equipment 5 Ê h ¹ ¾ IBRD / 88000 Post Open - National 70,964.49 0.00 2022-02-27 2022-04-24 2022-10-21 tribution Logistics tions nvelope ementation JA-EP-08 / Ark of desk and ch Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 47,309.66 0.00 2022-02-27 2022-04-24 2022-10-21 airL Ü tribution Logistics tions nvelope ementation JA-EP-09 / Agricultural produ cts quality and safety testing Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 78,849.43 0.00 2022-02-27 2022-04-24 2022-10-21 station equipment tribution Logistics tions nvelope ementation œ § Á ( Ï ‰ h À K Ù ¾ JA-EP-10 / Processing, sortin Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl g and packaging equipment IBRD / 88000 Post Open - National 236,548.29 0.00 2022-02-27 2022-04-24 2022-10-21 tribution Logistics tions nvelope ementation å Ê Å ¾ JA-EP-11 / Warehousing tran sceiver, rotation and measuri Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 78,849.43 0.00 2022-02-27 2022-04-24 2022-10-21 ng equipment Ó ¨ 6 Ñ l ¨ Ê ¡ tribution Logistics tions nvelope ementation Ï ¾ JA-EP-12 / Agricultural produ Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl cts traceability qr code code IBRD / 88000 Post Open - National 22,084.46 0.00 2022-02-27 2022-04-24 2022-10-21 tribution Logistics tions nvelope ementation œ § Á ¯ • Œ ô S h Page 3 AY-EP-02 / 1, 10 sets of com puter for assembling comput er, configuration: I5-10400 - f , the Great Wall of brass fan Component 2: Improving Dis Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 20,517.35 18,397.23 Completed 2022-02-22 2022-04-19 2022-04-21 2022-10-16 2022-05-06 and adata, 16 g, 730-2 g, sho tribution Logistics tions nvelope wing a gigabyte H510 mothe rboard, Kingston 250 gb solid state m. 2, west of 1000 g, th e Great Wall is the common c ase, th JJJK-EP-003 / 1, 120 sets of c omputers and peripherals, pr inters, 20, the projection equi pment 3 sets. Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 177,598.86 0.00 2022-02-27 2022-04-24 2022-10-21 2, 150 sets ark of desk and c tribution Logistics tions nvelope ementation hair. After the completion of the e nd user: the market to jiujian g rich and construction inves tment group co., LTD., operat JJJK-EP-004 ing and using/ 1, the qr code c ode 1 set. 2, large LED electronic displa y screen 2 pieces. 3, article 1 processing and so Component 2: Improving Dis Single Stage - One E Pending Impl rting and packaging equipme IBRD / 88000 Post Request for Bids Open - National 973,083.91 0.00 2022-03-07 2022-03-12 2022-04-23 2022-05-23 2022-06-27 2022-12-24 tribution Logistics nvelope ementation nt. 4, ice ice crusher 1. 5, oxygen, oxygen, oxygen st orage equipment 1 set. The end user: to jiujiang and rich constructi PZ-EP-05 / 4.2 million more t han 500000 dollars of the ba nk's inquiry limit contract bu dget, decided to take the do Component 2: Improving Dis Single Stage - One E IBRD / 88000 Post Request for Bids Open - National 662,868.33 0.00 Canceled 2022-03-07 2022-03-12 2022-04-23 2022-05-23 2022-06-27 2022-12-24 mestic competitive bidding p tribution Logistics nvelope rocurement. Given to penzer county urban development g roup for cotton trading cente r of the operation and use. St andardizat AY-EP-009 / 2 for warehouse forklift for QingShan Town far Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 63,190.16 0.00 2022-02-26 2022-04-23 2022-10-20 mers' market tribution Logistics tions nvelope ementation 2† Ó “ ( É f ( Ž R q G œ 8 : AY-EP-007 / Including librarie s, refrigeration and control e quipment and cold storage d oors, etc., according to 80% Component 2: Improving Dis Single Stage - One E Pending Impl of the cold storage area, heig IBRD / 88000 Post Request for Bids Open - National 409,472.20 0.00 2022-03-07 2022-03-12 2022-04-23 2022-05-23 2022-06-27 2022-12-24 tribution Logistics nvelope ementation ht 6 meters, a total of about 7200 cubic meters, per cubi ì Ä “ S 6 · Ê § 6 ¾ å Ê · “ è I · “ b ï „ 80% Ø ¦ 6s ¡ q ¦ 7 200Ë ¹ s Ï Ë ¹ s 360C q 259. 2 C JA-EP-14 / Light passenger 4 (ZhongDuanTu transport, ma inly to carry agricultural prod ucts in all the towns), 3 car li Component 2: Improving Dis Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 234,726.23 0.00 Canceled 2022-02-27 2022-04-24 2022-10-21 ght trucks, heavy card 1, use tribution Logistics tions nvelope r agricultural companies { ¢ 4† - í Ð “ ; • : ( a G Ð œ § Á { a 3† Í a 1† ( 7 œ l ø AY-EP-003 / Computer 170, monovalent 4500 yuan Qing Component 2: Improving Dis Single Stage - One E Pending Impl Shan Town farmers market o IBRD / 88000 Post Request for Bids Open - National 121,023.00 0.00 2022-03-07 2022-03-12 2022-04-23 2022-05-23 2022-06-27 2022-12-24 tribution Logistics nvelope ementation ffice equipment 5 170ð U ÷ 4500C R q G œ 8 : ž l ¾ JA-GD-02 / Low-temperature Component 2: Improving Dis Request for Quota Single Stage - One E Cold Storage Equipment Proc IBRD / 88000 Post Open - National 498,000.00 0.00 Canceled 2019-09-07 2019-11-02 2020-01-01 tribution Logistics tions nvelope urement in Jing'an County JA-EP-06 / air conditioner Part B to buy air conditioning project, a total of 50 300000 Component 2: Improving Dis Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 47,067.68 0.00 Canceled 2022-01-11 2022-03-08 2022-09-04 yuan. tribution Logistics tions nvelope z y î Bè - p z q ¡ 50ð 30 C YS-EP-02 / Need to purchase a set of low-temperature refri geration and fresh-keeping e quipment Component 2: Improving Dis Request for Quota Single Stage - One E Under Imple The budgeted unit price is 18 IBRD / 88000 Post Open - National 274,268.16 0.00 2022-07-18 2022-09-12 2023-03-11 tribution Logistics tions nvelope mentation 43200 yuan, totaling 184320 0 yuan Requirements: (1) combined warehouse body: 5120 cubic meters, ≥ 100mm thick poly urethane insulation board, a PZ-EP-02 / Three desktop co mputers, one laptop comput er and one printer, with a bu dget of 20000 yuan. It is use Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl d to ensure the use of marke IBRD / 88000 Post Open - National 2,960.00 0.00 2022-04-03 2022-05-29 2022-11-25 tribution Logistics tions nvelope ementation t coordinators, financial acco untants and MIS system oper ators. 3ð ð 5 1ð ° , 5 Œ 1ð S p : „ — 2 C ( Ž Ý œ : O X " ¡ 8 — X Œ MISû ß Í \ º X „ • ( TH-EP-001 / Need to purchas e 3 desktop computers and 2 all-in-one printers The unit price of the budget computer is 6000 yuan, and t Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 3,556.80 0.00 2022-04-03 2022-05-29 2022-11-25 he unit price of the printer is tribution Logistics tions nvelope ementation 3000 yuan, a total of 24000 yuan Requirements: above win10 system and above 8g memor y For Taihe County YS-EP-03 / Need to purchase 2 pieces of processing, sortin g and packaging equipment The budget unit price is 7500 00 yuan, totaling 1500000 yu Component 2: Improving Dis Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 222,382.51 0.00 Canceled 2022-07-19 2022-09-13 2023-03-12 an tribution Logistics tions nvelope Requirements: (1) automatic fruit cleaning, grading and pa ckaging line: 1, daily producti on capacity ≥ 20 tons (2) Vegetab Page 4 YS-EP-04 / Need to purchase a set of warehousing, receivi ng, transferring and measuri ng equipment Component 2: Improving Dis Request for Quota Single Stage - One E The budgeted unit price is 30 IBRD / 88000 Post Open - National 44,607.00 0.00 Canceled 2022-07-19 2022-09-13 2023-03-12 tribution Logistics tions nvelope 0000 yuan, totaling 300000 y uan Requirements: (1) turnover b ox: 1 Outer diameter: ≥ 800*500* 530mm inner diameter: ≥ 75 YS-EP-06 / Need 0*450*390 purchase to loa product 4 air conditioners The budgeted unit price is 60 00 yuan, totaling 24000 yuan Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 3,556.80 0.00 2022-07-20 2022-09-14 2023-03-13 Requirement: 2p Hang up, va tribution Logistics tions nvelope ementation riable frequency cooling and heating For Yushan County agricultur al products logistics transit c enter office YS-EP-07 / Need to purchase 8 computers and peripheral e quipment The budget unit price is 4500 yuan, and the total price is 2 Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 5,335.20 0.00 2022-07-20 2022-09-14 2023-03-13 6000 yuan tribution Logistics tions nvelope ementation Requirements: processor am d-a3050u, memory 8g, hard disk 1TB, win11 system For Yushan County agricultur al products logistics transi YS-EP-08 / Need to purchase 8 sets of tables, chairs and c abinets The budgeted unit price is 30 Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl 00 yuan, totaling 24000 yuan IBRD / 88000 Post Open - National 3,556.80 0.00 2022-07-20 2022-09-14 2023-03-13 tribution Logistics tions nvelope ementation Requirements: the office tabl e is 80cm by 160cm, meetin g the office needs For Yushan County agricultur al products logistics transit c enter off PZ-EP-05A / We need to purc hase 7 standard factory elev ators and 1 guest elevator wi th machine room in office bui lding Component 2: Improving Dis Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 385,320.00 0.00 Canceled 2022-07-20 2022-09-14 2023-03-13 The budgeted unit price is 32 tribution Logistics tions nvelope 5000 yuan, totaling 2600000 yuan Cargo elevator requirements: Speed: 0.5m/s Load: 2000kg Floor / station / door: 3/3/3 TH-EP-003 / Need to purchas e 4 file cabinets The budget unit price is 1000 Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 592.80 0.00 2022-07-20 2022-09-14 2023-03-13 yuan, totaling 4000 yuan tribution Logistics tions nvelope ementation Requirement: 850*390*1900 For Taihe County PMO Office LN-EP-03 / Longnan needs to purchase 6 first-line brand el evators used in the trading c enter: Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 225,766.00 0.00 2022-09-20 2022-11-15 2023-05-14 (1) The rated load capacity of tribution Logistics tions nvelope ementation each elevator is 1050kg, the lifting speed is 1.0m/s, the d epth of the foundation pit is 1.5m, and the size of the doo r opening is 1m * 2.2m. PZ-EP-05B / We need to purc hase 7 standard factory elev ators and 1 guest elevator wi th machine room in office bui lding Component 2: Improving Dis Single Stage - One E Pending Impl IBRD / 88000 Post Request for Bids Open - National 385,320.00 0.00 2022-11-01 2022-11-06 2022-12-18 2023-01-17 2023-02-21 2023-08-20 The budgeted unit price is 32 tribution Logistics nvelope ementation 5000 yuan, totaling 2600000 yuan Cargo elevator requirements: Speed: 0.5m/s Load: 2000kg Floor / station / door: 3/3/3 JA-EP-14A / Jing'an needs to purchase 7 vehicles: 2 bread type refrigerated vehicles; 1 6.8m refrigerated truck; 2 4. Component 2: Improving Dis Single Stage - One E Under Imple IBRD / 88000 Post Request for Bids Open - National 234,726.23 0.00 2022-11-01 2022-12-15 2022-11-06 2022-12-18 2023-04-25 2023-01-17 2023-04-25 2023-02-21 2023-08-20 2m refrigerated trucks; 1 MP tribution Logistics nvelope mentation V truck; 1 transport vehicle ( automatic transmission). For market construction, the am ount is 1.488 million yuan JJJK-EP-005 / Jiujiang Econom ic Development needs to pur chase 1 desktop computer The cost is 5,000 RMB Parameters: Win10 system 256G SSD + 1T SSD Component 2: Improving Dis Request for Quota Single Stage - One E Within 140 inches IBRD / 88000 Post Open - National 719.50 0.00 Signed 2022-12-19 2023-02-13 2023-08-12 tribution Logistics tions nvelope User: Jiujiang Economic Deve lopment Zone Project Office Office ] _ Ï • Ç - 1ð ð 5 9 ( : 5000C  p win10û ß 256gú l JJJK-EP-001 / User: Jiujiang Ec onomic Development Zone P roject Office Jiujiang Economi c Development Zone needs t Component 2: Improving Dis Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 1,510.21 0.00 Signed 2022-12-19 2023-02-13 2023-08-12 o purchase two desktop com tribution Logistics tions nvelope puters 8g1t2g, 21.5-inch mo nitors 8g512g14-inch notebo ok monitors, estimated need 10,050 yuan HC-GD-01 / Office Equipmen t Procurement of Huichang C Component 1: Strengthening Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 31,930.14 0.00 2023-02-28 2023-04-25 2023-05-25 ounty Farmers' Professional production logistics tions nvelope ementation Cooperative Organizations Page 5 YS-EP-03&04 / Buy fruit and vegetable type z roller conve yor 2 sets, single-pass sorter 1 set, weight tester 2 sets, el Component 2: Improving Dis Request for Quota Single Stage - One E IBRD / 88000 Post Open - National 259,942.00 0.00 Signed 2023-03-06 2023-05-01 2023-10-28 ectrical configuration 2 sets, tribution Logistics tions nvelope fruit and vegetable washing pool 1 set, fruit and vegetabl e type I roller conveyor 3 set s, fruit and vegetable washin g YS-EP-05 / The warehouse n eeds to buy a forklift truck an d two multi-purpose trucks, a total of 400,000 yuan, forklift Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl IBRD / 88000 Post Open - National 59,335.60 0.00 2022-07-19 2022-09-13 2023-03-12 truck requirements: the maxi tribution Logistics tions nvelope ementation mum lifting weight of 5 T, cut ting center distance of 600 m m, power form of diesel, oper ating form: sitting posture; JJJK-EP-002 / Floor Scale, refr Component 2: Improving Dis Single Stage - One E Under Imple igeration system equipment IBRD / 88000 Post Request for Bids Open - National 1,594,405.93 0.00 2023-05-04 2023-06-18 2023-05-09 2023-06-20 2023-07-20 2023-08-24 2024-02-20 tribution Logistics nvelope mentation procurement PZ-EP-14 / Procurement of of Component 2: Improving Dis Request for Quota Single Stage - One E Pending Impl fice equipment and furniture IBRD / 88000 Post Open - National 6,907.00 0.00 2023-05-20 2023-07-15 2024-01-11 tribution Logistics tions nvelope ementation for Pengze County NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual JA-CS-03 / Jing'an County Far Component 1: Strengthening Consultant Qualifi Pending Impleme IBRD / 88000 Post Open - National 86,700.00 0.00 2019-02-18 2019-03-11 2019-04-24 2019-05-24 2019-06-28 2020-12-27 mer Cooperative Training production logistics cation Selection ntation SXMB-CS-04 / Development Component 3: Support Servi Consultant Qualifi Plan for the Provincial Agricul IBRD / 88000 ces for the Whole Distributio Post Open - National 57,600.00 0.00 Signed 2019-08-05 2022-09-24 2019-08-19 2019-10-14 2023-04-01 2019-11-18 2020-11-17 cation Selection tural Product Distribution Sys n System tem SXMB-CS-03 / Special Resea Component 3: Support Servi Consultant Qualifi rch on Financing of Agricultur IBRD / 88000 ces for the Whole Distributio Post Open - National 43,200.00 0.00 Canceled 2019-05-06 2019-05-20 2019-07-15 2019-08-19 2020-08-18 cation Selection al Products Distribution Valu n System e Chain SXMB-CS-05 / Development Component 4: Project Manag Consultant Qualifi and Operation Maintenance o IBRD / 88000 ement, Monitoring and Evalu Post Open - National 72,000.00 69,705.84 Signed 2019-07-31 2019-07-30 2019-08-21 2019-10-04 2019-11-19 2019-11-03 2019-11-25 2019-12-08 2019-12-10 2020-06-05 cation Selection f Project Management Inform ation ation System PZ-CS-03 / Pengze County M Component 2: Improving Dis Consultant Qualifi arket Construction and Opera IBRD / 88000 Post Open - National 144,100.00 0.00 Canceled 2019-04-01 2019-04-22 2019-06-05 2019-07-05 2019-08-09 2024-08-07 tribution Logistics cation Selection tion Support Consulting Servi ce TH-CS-04 / Taihe County Mar Component 2: Improving Dis Consultant Qualifi ket Construction and Operati IBRD / 88000 Post Open - National 144,100.00 0.00 Canceled 2019-10-08 2019-10-29 2019-12-12 2020-01-11 2020-02-15 2025-02-13 tribution Logistics cation Selection on Support Consulting Servic e SXMB-CS-06 / Market Constr Component 2: Improving Dis Quality And Cost- Pending Impleme uction and Operation Support IBRD / 88000 Post Open - National 1,152,700.00 0.00 2019-09-30 2019-10-21 2019-12-04 2020-01-01 2020-01-31 2020-03-06 2020-04-10 2021-04-10 tribution Logistics Based Selection ntation Consulting Service JJJK-CS-04 / Jiujiang Economi c Development Zone Market Component 2: Improving Dis Consultant Qualifi IBRD / 88000 Post Open - National 144,100.00 0.00 Canceled 2019-09-02 2019-09-16 2019-11-11 2019-12-16 2024-12-14 Construction and Operation S tribution Logistics cation Selection upport Consulting Service SXMB-CS-01 / Project Monito Component 4: Project Manag Consultant Qualifi Under Implement IBRD / 88000 Post Open - National 144,000.00 0.00 2019-01-21 2019-08-18 2019-02-04 2019-04-01 2019-05-06 2024-05-04 ring and Evaluation ement, Monitoring and Evalu cation Selection ation ation SXMB-CS-02 / Environmental Component 4: Project Manag Consultant Qualifi Under Implement IBRD / 88000 Post Open - National 144,000.00 0.00 2019-01-21 2019-05-15 2019-02-04 2019-04-01 2019-05-06 2024-05-04 Monitoring Plan and Manage ement, Monitoring and Evalu cation Selection ation ment ation SXMB-CS-03A / Modern agric Component 3: Support Servi ultural products circulation s Consultant Qualifi IBRD / 88000 ces for the Whole Distributio Post Open - National 23,541.23 22,167.78 Signed 2022-01-11 2022-02-16 2022-02-01 2022-03-17 2022-06-09 2022-04-16 2022-06-09 2022-05-21 2022-07-01 2022-11-17 ystem construction research cation Selection n System ° ã œ § Á A S û ú ¾ v SXMB-CS-03B / Modern circu Component 3: Support Servi lation system of agricultural Consultant Qualifi IBRD / 88000 ces for the Whole Distributio Post Open - National 23,541.23 22,167.78 Signed 2022-01-11 2022-02-16 2022-02-01 2022-03-17 2022-05-26 2022-04-16 2022-06-01 2022-05-21 2022-07-01 2022-11-17 products in jiangxi province cation Selection n System _ • œ § Á ° ã A S û v JJJK-CS-008 / JJJK - CS - 008 s ervice support specialist tea Component 2: Improving Dis Consultant Qualifi m has hired the market const IBRD / 88000 Post Open - National 157,865.66 0.00 Signed 2022-03-07 2021-04-15 2022-03-28 2022-05-11 2021-04-01 2022-06-10 2021-04-09 2022-07-15 2023-01-11 tribution Logistics cation Selection ruction JJJK-CS-008ò X ÷ : ú ¾ ¡ / ¶ â JA-CS-13 / Market constructi Component 2: Improving Dis Consultant Qualifi Pending Impleme on and operation support ser IBRD / 88000 Post Open - National 157,746.12 0.00 2022-03-07 2022-03-28 2022-05-11 2022-06-10 2022-07-15 2023-01-11 tribution Logistics cation Selection ntation vice : ú ¾ Œ Ð % / ¡ SXMB-CS-08 / The purpose o f the consulting service is to hire a consulting company wi th rich project implementatio Component 2: Improving Dis Consultant Qualifi IBRD / 88000 Post Open - National 199,000.00 0.00 Signed 2022-10-10 2022-10-10 2022-10-31 2022-12-14 2023-02-24 2023-01-13 2023-05-15 2023-02-17 2023-08-16 n experience to provide tech tribution Logistics cation Selection nical support for the project, such as project management , project implementation coor dination, suggestions and pr oject report INDIVIDUAL CONSULTANTS Page 6 Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AY-CS-02 / Anyuan District Fi Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-06-03 2019-07-22 2019-08-12 2019-09-16 2024-09-14 nancial Management Consult production logistics ant Selection ant TH-CS-01 / Taihe County Leg Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-10-08 2019-11-26 2019-12-17 2020-01-21 2025-01-19 al Affairs Consultant production logistics ant Selection TH-CS-02 / Taihe County Fin Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-10-08 2019-11-26 2019-12-17 2020-01-21 2025-01-19 ancial management consulta production logistics ant Selection nt PZ-CS-02 / Pengze County L Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 0.69 0.00 Canceled 2019-05-06 2019-06-24 2019-07-15 2019-08-19 2021-08-18 egal Affairs Consultant production logistics ant Selection PZ-CS-01 / Pengze County Fi Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 0.69 0.00 Canceled 2019-05-06 2019-06-24 2019-07-15 2019-08-19 2021-08-18 nancial Management Consult production logistics ant Selection ant AY-CS-01 / Anyuan District L Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-06-03 2019-07-22 2019-08-12 2019-09-16 2024-09-14 egal Affairs Consultant production logistics ant Selection YS-CS-02 / Yushan County Fi Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-06-03 2019-07-22 2019-08-12 2019-09-16 2024-09-14 nancial Management Consult production logistics ant Selection ant YS-CS-01 / Yushan County L Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-06-03 2019-07-22 2019-08-12 2019-09-16 2024-09-14 egal Affairs Consultant production logistics ant Selection LN-CS-01 / Longnan County Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-10-08 2019-11-26 2019-12-17 2020-01-21 2025-01-19 Legal Affairs Consultant production logistics ant Selection LN-CS-02 / Longnan County Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-10-08 2019-11-26 2019-12-17 2020-01-21 2025-01-19 Financial Management Consu production logistics ant Selection ltant JJJK-CS-01 / Jiujiang Economi Component 1: Strengthening Individual Consult c Development Zone Legal Af IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-09-02 2019-10-21 2019-11-11 2019-12-16 2024-12-14 production logistics ant Selection fairs Consultant JJJK-CS-02 / Jiujiang Economi Component 1: Strengthening Individual Consult c Development Zone Financi IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-09-02 2019-10-21 2019-11-11 2019-12-16 2024-12-14 production logistics ant Selection al Management Consultant HC-CS-01 / Huichang County Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2024-06-01 Legal Affairs Consultant production logistics ant Selection HC-CS-02 / Huichang County Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2024-06-01 Financial Management Consu production logistics ant Selection ltant JA-CS-01 / Jing'an County Le Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2024-06-01 gal Affairs Consultant production logistics ant Selection JA-CS-02 / Jing'an County Fin Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 1.73 0.00 Canceled 2019-02-18 2019-04-08 2019-04-29 2019-06-03 2024-06-01 ancial Management Consulta production logistics ant Selection nt TH-CS-001 / Taihe County M arket Development and Man Component 1: Strengthening Individual Consult Under Implement IBRD / 88000 Post Open 34,600.00 0.00 2019-10-08 2021-03-09 2019-11-26 2019-12-17 2020-01-21 2025-01-19 agement Coordinator Ecom production logistics ant Selection ation merce Direction LN-CS-001 / Longnan County Market Development and Ma Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 34,600.00 21,017.38 Signed 2019-10-08 2020-04-30 2019-11-26 2020-04-21 2019-12-17 2020-05-08 2020-01-21 2020-05-24 2025-01-19 nagement Coordinator Ecom production logistics ant Selection merce Direction JJJK-CS-001 / Jiujiang Econom ic Development Zone Market Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 34,600.00 22,218.44 Signed 2019-09-30 2020-05-25 2019-11-18 2020-06-10 2019-12-09 2020-06-23 2020-01-13 2020-06-23 2025-01-11 Development and Manageme production logistics ant Selection nt Coordinator Ecommerce Direction PZ-CS-001 / Pengze County Market Development and Ma Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 13,800.00 0.00 Canceled 2019-09-30 2019-11-18 2019-12-09 2020-01-13 2022-01-12 nagement Coordinator Ecom production logistics ant Selection merce Direction JA-CS-001 / Jing'an County M arket Development and Man Component 1: Strengthening Individual Consult Under Implement IBRD / 88000 Post Open 36,000.00 0.00 2019-10-15 2022-05-27 2019-12-03 2019-12-24 2020-01-28 2025-01-26 agement Coordinator Ecom production logistics ant Selection ation merce Direction TH-CS-002 / Taihe County M arket Development and Man Component 1: Strengthening Individual Consult Under Implement IBRD / 88000 Post 36,000.00 0.00 2019-10-08 2021-03-09 2019-11-26 2019-12-17 2020-01-21 2025-01-19 agement Coordinator Busine production logistics ant Selection ation ss Marketing Direction TH-CS-003 / Taihe County M arket Development and Man Component 1: Strengthening Individual Consult Pending Impleme IBRD / 88000 Post Open 36,000.00 0.00 2019-10-08 2019-11-26 2019-12-17 2020-01-21 2020-07-19 agement Coordinator Planni production logistics ant Selection ntation ng and Design Direction JA-CS-002 / Jing'an County M arket Development and Man Component 1: Strengthening Individual Consult Under Implement IBRD / 88000 Post Open 36,000.00 0.00 2019-10-08 2022-05-27 2019-11-26 2019-12-17 2020-01-21 2025-01-19 agement Coordinator Busine production logistics ant Selection ation ss Marketing Direction JJJK-CS-002 / Jiujiang Econom ic Development Zone Market Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 36,000.00 0.00 Signed 2019-10-08 2021-06-02 2019-11-26 2021-06-16 2019-12-17 2021-07-01 2020-01-21 2025-01-19 Development and Manageme production logistics ant Selection nt Coordinator Business Mar keting Direction JJJK-CS-003 / Jiujiang Econom ic Development Zone Market Component 1: Strengthening Individual Consult Under Implement Development and Manageme IBRD / 88000 Post Open 36,000.00 0.00 2019-10-08 2019-12-15 2019-11-26 2019-12-17 2020-01-21 2025-01-19 production logistics ant Selection ation nt Coordinator Planning and Design Direction LN-CS-002 / Longnan County Market Development and Ma Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 36,000.00 21,017.38 Signed 2019-12-01 2020-04-03 2020-01-19 2020-04-21 2020-02-09 2020-05-08 2020-03-15 2020-05-24 2025-03-14 nagement Coordinator Busin production logistics ant Selection ess Marketing Direction Page 7 LN-CS-003 / Longnan County Market Development and Ma Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 36,000.00 10,088.34 Signed 2019-12-01 2019-06-10 2020-01-19 2019-06-12 2020-02-09 2019-07-01 2020-03-15 2019-07-10 2025-03-14 nagement Coordinator Plann production logistics ant Selection ing and Design Direction YS-CS-002 / Yushan County Market Development and Ma Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 36,000.00 0.00 Signed 2019-09-30 2019-08-19 2019-11-18 2019-09-16 2019-12-09 2019-11-01 2020-01-13 2025-01-11 nagement Coordinator Busin production logistics ant Selection ess Marketing Direction PZ-CS-002 / Pengze County Market Development and Ma Component 1: Strengthening Individual Consult Under Implement IBRD / 88000 Post Open 14,400.00 0.00 2019-09-30 2022-02-18 2019-11-18 2019-12-09 2020-01-13 2022-01-12 nagement Coordinator Busin production logistics ant Selection ation ess Marketing Direction SXMB-CS-07 / Baseline surve Component 4: Project Manag IBRD / 88000 Post Direct Selection Direct 14,400.00 13,961.80 Signed 2020-04-24 2020-04-28 2020-05-04 2020-04-28 2020-07-08 2020-05-01 2021-01-04 y expert team ement, Monitoring and Evalu ation HC-CS-001 / Huichang Count y Market Development and Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 7,204.61 6,516.35 Signed 2019-09-30 2020-06-09 2019-11-18 2020-06-17 2019-12-09 2021-07-13 2020-07-01 2021-07-14 2025-06-30 Management Coordinator Ec production logistics ant Selection ommerce Direction HC-CS-002 / Huichang Count y Market Development and Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 7,204.61 6,516.35 Signed 2019-09-30 2020-06-09 2019-11-18 2020-06-17 2019-12-09 2021-07-13 2020-07-01 2021-07-14 2025-06-30 Management Coordinator B production logistics ant Selection usiness Marketing Direction AY-CS-001 / Anyuan District Market Development and Ma Component 1: Strengthening Individual Consult Under Implement IBRD / 88000 Post Open 7,204.61 0.00 2019-09-30 2019-05-06 2019-11-18 2019-12-09 2020-08-01 2025-07-31 nagement Coordinator Ecom production logistics ant Selection ation merce Direction AY-CS-002 / Anyuan District Market Development and Ma Component 1: Strengthening Individual Consult Pending Impleme IBRD / 88000 Post Open 7,204.61 0.00 2019-09-30 2019-11-18 2019-12-09 2020-08-01 2025-07-31 nagement Coordinator Busin production logistics ant Selection ntation ess Marketing Direction AY-CS-004 / ‰ • : : Ñ ¡ O Component 1: Strengthening Individual Consult Pending Impleme IBRD / 88000 Post Open 7,204.61 0.00 2021-01-12 2021-03-02 2021-03-23 2021-04-27 2021-10-24 X ¡ ° & X production logistics ant Selection ntation AY-CS-005 / ‰ • : : Ñ ¡ O Component 1: Strengthening Individual Consult Pending Impleme IBRD / 88000 Post Open 7,204.61 0.00 2021-01-12 2021-03-02 2021-03-23 2021-04-27 2021-10-24 X ¡ ¡ X production logistics ant Selection ntation YS-CS-001 / Yushan County Market Development and Ma Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 10,951.01 0.00 Signed 2019-09-30 2019-08-19 2019-11-18 2019-08-28 2019-12-09 2019-11-01 2020-01-13 2025-01-11 nagement Coordinator Ecom production logistics ant Selection merce Direction YS-CS-003 / Yushan County Market Development and Ma Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 10,662.82 0.00 Signed 2019-09-30 2020-03-23 2019-11-18 2020-03-11 2019-12-09 2020-04-21 2020-01-13 2025-01-11 nagement Coordinator Plann production logistics ant Selection ing and Design Direction YS-CS-005 / ‰ q ¿ : Ñ ¡ O Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 10,662.82 0.00 Signed 2021-01-12 2020-03-23 2021-03-02 2020-04-21 2021-03-23 2020-04-21 2021-04-27 2021-10-24 X production logistics ant Selection YS-CS-006 / ‰ q ¿ : Ñ ¡ O Component 1: Strengthening Individual Consult IBRD / 88000 Post Open 10,662.82 0.00 Signed 2021-01-12 2020-06-10 2021-03-02 2020-06-30 2021-03-23 2020-07-08 2021-04-27 2021-10-24 X production logistics ant Selection AY-CS-003 / ‰ • : : Ñ ¡ O Component 1: Strengthening Individual Consult Pending Impleme IBRD / 88000 Post Open 7,204.61 0.00 2021-01-06 2021-02-24 2021-03-17 2021-04-21 2021-10-18 X F ¡ % ¹ production logistics ant Selection ntation PZ-CS-003 / The legal affairs Component 2: Improving Dis Individual Consult Under Implement adviser agreement IBRD / 88000 Post Open 3,787.82 0.00 2022-02-17 2022-02-18 2022-04-07 2021-04-20 2022-04-28 2021-04-20 2022-06-02 2022-11-29 tribution Logistics ant Selection ation X ÷ Õ ‹ ‹ ¡ ~ î O ® PZ-CS-004 / Hire accounting Component 2: Improving Dis Individual Consult Under Implement HeSuanYuan agreementX ÷ IBRD / 88000 Post Open 3,787.82 0.00 2022-02-17 2022-02-18 2022-04-07 2021-04-18 2022-04-28 2021-04-28 2022-06-02 2022-11-29 tribution Logistics ant Selection ation ¡ 8 — X O ® YS-CS-007 / Yushan county market development and ma Component 2: Improving Dis Individual Consult IBRD / 88000 Post Open 7,889.17 0.00 Signed 2022-02-22 2021-12-07 2022-04-12 2021-12-21 2022-05-03 2022-01-28 2022-06-07 2022-12-04 nagement coordinator tribution Logistics ant Selection ‰ q ¿ : Ñ ¡ O X HC-CS-004 / Huichang mark et development and manage Component 2: Improving Dis Individual Consult IBRD / 88000 Post Open 7,889.17 0.00 Canceled 2022-02-22 2022-04-12 2022-05-03 2022-06-07 2022-12-04 ment coordinator ¿ : Ñ Œ tribution Logistics ant Selection ¡ O X HC-CS-005 / Huichang mark et development and manage Component 2: Improving Dis Individual Consult IBRD / 88000 Post Open 7,889.17 6,669.11 Signed 2022-02-22 2022-01-01 2022-04-12 2022-02-18 2022-05-03 2022-02-18 2022-06-07 2022-03-01 2022-12-04 ment coordinator ¿ : Ñ tribution Logistics ant Selection ¡ O X HC-CS-006 / Huichang mark et development and manage Component 2: Improving Dis Individual Consult IBRD / 88000 Post Open 7,889.17 6,669.11 Signed 2022-02-22 2022-01-01 2022-04-12 2022-02-18 2022-05-03 2022-02-18 2022-06-07 2022-03-02 2022-12-04 ment coordinator ¿ : Ñ tribution Logistics ant Selection ¡ O X JA-CS-003 / V ‰ ¿ : Ñ ¡ O X Component 2: Improving Dis Individual Consult Under Implement IBRD / 88000 Post Open 727.16 0.00 2022-02-18 2022-05-27 2022-04-08 2022-04-29 2022-06-03 2022-11-30 Market development and ma tribution Logistics ant Selection ation nagement coordinator JingAn county HC-CS-003 / Recruitment of Component 2: Improving Dis Individual Consult market Coordinator (busines IBRD / 88000 Post Open - National 7,440.00 6,870.57 Signed 2022-07-13 2021-09-15 2022-08-31 2021-10-13 2022-09-21 2022-09-13 2022-10-26 2021-10-31 2023-04-24 tribution Logistics ant Selection s direction) Û X : O X F ¡ ¹ YS-CS-008 / Employ one acc ountant of Yushan County W orld Bank loan project The estimated contract amou Component 2: Improving Dis Individual Consult IBRD / 88000 Post Open - National 3,556.80 0.00 Under Review 2022-07-15 2021-12-01 2022-09-02 2022-09-23 2022-10-28 2023-04-26 nt is 24000 yuan tribution Logistics ant Selection X ÷ ‰ q ¿ L ö L 7 > y î ¡ º X 1 0 — Ñ • 24000C Page 8 JJJK-CS-005 / Jiujiang Econom ic Development Zone plans t o recruit a coordinator to tak e over the post of JJJK-CS-001 Component 2: Improving Dis Individual Consult Pending Impleme IBRD / 88000 Post Open - National 7,000.00 0.00 2022-09-28 2022-11-16 2022-12-07 2023-01-11 2023-07-10 coordinator who has left. The tribution Logistics ant Selection ntation annual salary is estimated to be 50000 yuan, mainly respo nsible for assisting farmers' c ooperatives in market analysi s and YS-CS-009 / Hire an account ant for the World Bank loan p Component 2: Improving Dis Individual Consult Under Implement IBRD / 88000 Post Open - National 3,541.00 0.00 2023-02-10 2022-12-01 2023-03-31 2022-12-21 2023-04-21 2023-01-28 2023-05-26 2023-11-22 roject in Yushan County with tribution Logistics ant Selection ation an estimated contract amoun t of 24,000 yuan PZ-CS-04A / Hiring an accou Component 2: Improving Dis Individual Consult Pending Impleme IBRD / 88000 Post Open - National 3,453.00 0.00 2023-05-15 2023-07-03 2023-07-24 2023-08-28 2024-02-24 ntant for Pengze County tribution Logistics ant Selection ntation Page 9 PLAN DE ADQUISICIONES Información del proyecto: TEGUCIGALPA: WATER SUPPLY STRENGTHENING (P170469) Agencia implementadora del Proyecto: Alcaldia de Tegucigalpa Preámbulo De conformidad con el párrafo 5.9 de las "Regulaciones de Adquisición del Banco Mundial para prestatarios IPF" (julio de 2016) ("Regulaciones de Adquisiciones") el Sistema de seguimiento en Adquisiciones (STEP) será utilizado para preparar, aclarar y actualizar los Planes de Adquisiciones y realizar todas las transacciones de adquisiciones para el Proyecto. Esta parte del texto, junto con las tablas del Plan de Adquisiciones en STEP constituyen el Plan de Adquisiciones para el Proyecto. Las siguientes condiciones aplican a todas las actividades de adquisición en el Plan de Adquisiciones. Los otros elementos del Plan de Adquisiciones como se exigen en el apartado 4.4 de las Regulaciones de Adquisiciones se exponen en el STEP. Documentos Estándar de Adquisiciones del Banco: Se utilizarán para todos los contratos sujetos a competencia internacional y los contratos así especificados en las tablas Plan de Adquisiciones de STEP. Disposiciones Nacionales de Adquisición: De conformidad con el párrafo 5.3 de las Regulaciones de Adquisiciones, cuando el enfoque es el mercado nacional (como se especifica en las tablas del Plan de Adquisiciones de STEP), se utilizarán documentos acordados con el Banco Mundial los cuales forman parte del Manual de Operaciones del Proyecto y se aplicarán las Regulaciones de Adquisiciones del Banco Mundial y no la Ley de Contrataciones del Estado de Honduras. Para las adquisiciones con enfoque al mercado nacional, los documentos acordados con el Banco son: 1. Declaración de Confidencialidad 2. Solicitud de Expresiones de Interés 3. Evaluación de Expresiones de Interés para Lista Corta 4. Solicitud de Hojas de Vida Consultor Individual 5. Informe de evaluación de Consultores Individuales 6. Modelo de Contrato de Consultor Individual 7. Documento de Solicitud de Cotizaciones RFQ Bienes 8. Documento de Solicitud de Cotizaciones RFQ Obras 9. Informe de Evaluación de ofertas por RFQ Bienes y Obras 10. Documento de Solicitud de Cotizaciones RFQ Servicios de no consultoría 11. Informe de Evaluación de ofertas por RFQ Servicios de no consultoría 12. Documento de Solicitud de Ofertas RFB (Nacional) Obras 13. Documento de Solicitud de Ofertas RFB (Nacional) Bienes 14. Documento de Solicitud de Ofertas RFB (Nacional) Servicios de no Consultoría 15. Informe de evaluación RFB (BIENES, OBRAS Y SNC) PROCUREMENT Honduras : TEGUCIGALPA: WATER SUPPLY STRENGTHENING PROJECT PLAN General Information Country: Honduras 2019-10-15 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170469 GPN Date: 2019-10-21 Project Name: TEGUCIGALPA: WATER SUPPLY STRENGTHENING PROJECT Loan / Credit No: IDA / 64600 Alcaldía Municipal del Distrito Central Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned HN-AMDC-139212-CW-RFB / Component 2. Improved wat Mejoras y Equipamiento de la er production capacity and e Open - Internationa Single Stage - One E 2022-04-0 s Plantas de Tratamiento de IDA / 64600 Post Request for Bids 9,100,000.00 0.00 Canceled 2020-11-01 2020-11-16 2021-01-15 2021-02-14 2021-04-05 fficiency of the distribution n l nvelope 5 Agua Potable: El Picacho, La etwork Concepción y Los Laureles HN-AMDC-139218-CW-RFB / Component 2. Improved wat Construccion y equipamiento er production capacity and e Open - Internationa Single Stage - One E 2022-10-2 IDA / 64600 Post Request for Bids 7,000,000.00 0.00 Canceled 2020-06-19 2020-06-24 2020-08-08 2020-09-14 2020-11-03 para la sectorización de la z fficiency of the distribution n l nvelope 4 ona abastecida por el subsist etwork ema Picacho HN-AMDC-139428-CW-RFB / Construcción de obras menor Component 2. Improved wat es y mantenimiento particul er production capacity and e Single Stage - One E Pending Imp 2022-05-1 IDA / 64600 Post Request for Bids Open - National 2,700,000.00 0.00 2021-02-01 2021-02-04 2021-03-06 2021-04-05 2021-05-10 armente en el sitio de los aliv fficiency of the distribution n nvelope lementation 0 iaderos, drenajes y pendient etwork es de las presas Los Laureles y La Concepcion Request for Bids - HN-AMDC-139436-CW-RFB / Component 3. Project Manag Single Stage - One E Small Works SPD Pending Imp 2022-12-2 IDA / 64600 Post Request for Bids Open - National 80,000.00 0.00 2022-08-01 2022-08-06 2022-08-26 2022-09-16 2022-10-21 Remodelación de oficinas UC ement and Technical Assista nvelope (1 envelope proce lementation 0 P nce ss) HN-AMDC-262817-CW-RFB / Ejecución de obra de distritos National Procure Component 2. Improved wat de medición y programa de r ment Document - er production capacity and e Open - Internationa Single Stage - One E Pending Imp 2025-01-3 educción de agua no factura IDA / 64600 Post Request for Bids 1 Envelope proce 5,000,000.00 0.00 2023-10-16 2023-10-21 2023-12-02 2024-01-01 2024-02-05 fficiency of the distribution n l nvelope lementation 0 da (NRW) en el Sistema El Pi ss (Non Bank-SPD etwork cacho y otras áreas que se pr ) ioricen para aislar sectores e specíficos de la red de distrib ución Request for Bids - HN-AMDC-323709-CW-RFB / Component 2. Improved wat Single Stage - One E Works (without pr Pending Imp 2024-04-3 Mejoras en la Planta de Trata IDA / 64600 er production capacity and e Post Request for Bids Open - National 2,900,000.00 0.00 2022-11-28 2022-12-03 2023-01-14 2023-02-13 2023-03-20 nvelope equalification) SP lementation 0 miento de Agua Potable de El fficiency of the distribution n D Picacho etwork HN-AMDC-323710-CW-RFB / Component 2. Improved wat Request for Bids - Mejoras de las Plantas de Tra er production capacity and e Open - Internationa Single Stage - One E Works (without pr Pending Imp 2024-05-2 IDA / 64600 Post Request for Bids 6,200,000.00 0.00 2023-05-15 2023-05-20 2023-07-01 2023-07-31 2023-09-04 tamiento de Agua Potable de fficiency of the distribution n l nvelope equalification) SP lementation 7 Los Laureles y La Concepción etwork D GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HN-AMDC-139445-GO-RFB / Component 3. Project Manag Suministro de vehículos para Single Stage - One E IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 200,000.00 185,112.55 Completed 2020-11-01 2021-12-20 2020-11-06 2022-01-28 2020-12-18 2022-02-24 2021-01-17 2022-05-09 2021-02-21 2022-06-04 2021-08-20 2022-08-25 la supervisión, operación y m nvelope nce antenimiento del sistema HN-AMDC-139206-GO-RFB / Component 3. Project Manag Single Stage - One E Suministro de equipo de cóm IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 40,000.00 45,414.77 Completed 2020-09-25 2020-09-21 2020-09-30 2020-09-24 2020-10-30 2020-10-23 2020-11-14 2020-12-01 2020-12-19 2021-07-20 2021-02-02 2022-06-10 nvelope puto para la UCP y UMAPS nce HN-AMDC-139446-GO-RFB / Component 3. Project Manag Single Stage - One E Mobiliario de oficina para la IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 29,000.00 0.00 Canceled 2020-10-16 2020-10-21 2020-11-20 2020-12-11 2021-01-09 2021-05-09 nvelope UCP y UMAPS nce HN-AMDC-262811-GO-RFQ / Component 3. Project Manag Request for Quota Single Stage - One E Adquisición de software para IDA / 64600 ement and Technical Assista Post Open - National 3,000.00 0.00 Signed 2021-12-01 2022-08-16 2022-01-27 2022-01-28 tions nvelope usuarios de la UCP nce HN-AMDC-139395-GO-RFB / Suministro e Instalación de E Component 2. Improved wat quipos para Sectores Hidráuli er production capacity and e Open - Internationa Single Stage - One E Pending Impl IDA / 64600 Prior Request for Bids 2,100,000.00 0.00 2023-06-01 2023-06-06 2023-07-21 2023-08-20 2023-10-03 2024-01-31 cos y Reducción de Agua No fficiency of the distribution n l nvelope ementation Factura (ANF) para la Red del etwork Sistema de Agua Potable de El Picacho HN-AMDC-291799-GO-RFB / Component 3. Project Manag Adquisición de promocionale Single Stage - One E IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 60,000.00 0.00 Signed 2022-05-02 2022-07-25 2022-05-07 2022-08-16 2022-06-18 2022-08-19 2022-07-18 2022-10-25 2022-08-22 2023-02-18 s e imagen publica Institucio nvelope nce nal para lanzamiento de UMA PS HN-AMDC-195215-GO-RFQ / Component 3. Project Manag Request for Quota Single Stage - One E IDA / 64600 Post Open - National 29,000.00 0.00 Signed 2022-08-17 2022-08-16 2022-10-12 2023-01-10 Mobiliario de oficina para la ement and Technical Assista tions nvelope UCP y DCS nce HN-AMDC-306250-GO-RFB / Component 3. Project Manag Single Stage - One E Adquisición de Equipo Cómp IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 60,000.00 0.00 Canceled 2022-08-10 2022-10-27 2022-08-15 2023-01-16 2022-09-04 2022-12-12 2022-09-19 2022-10-24 2023-01-22 nvelope uto UMAPS, DCS y UCP nce HN-AMDC-247111-GO-RFQ / Component 3. Project Manag Equipo de computo y de com Request for Quota Single Stage - One E IDA / 64600 ement and Technical Assista Post Limited 9,000.00 0.00 Canceled 2021-08-21 2021-10-16 2022-04-14 unicación para el punto focal tions nvelope nce y socializadores HN-AMDC-306702-GO-RFB / Component 2. Improved wat Single Stage - One E Pending Impl Equipamiento de laboratorio IDA / 64600 er production capacity and e Post Request for Bids Open - National 200,000.00 0.00 2022-09-05 2022-09-10 2022-10-10 2022-10-30 2022-12-13 2023-06-11 nvelope ementation para Control de Calidad fficiency of the distribution n etwork HN-AMDC-139431-NC-RFB / Component 2. Improved wat Single Stage - One E Equipamiento de laboratorio IDA / 64600 er production capacity and e Post Request for Bids Open - National 200,000.00 0.00 Canceled 2021-01-15 2021-01-20 2021-02-19 2021-03-11 2021-04-24 2021-10-21 nvelope para Control de Calidad fficiency of the distribution n etwork Page 1 HN-AMDC-315105-GO-RFQ / Component 3. Project Manag Request for Quota Single Stage - One E Pending Impl IDA / 64600 Post Open - National 25,000.00 0.00 2022-10-29 2022-12-24 2023-06-22 Adquisición de Motocicletas ement and Technical Assista tions nvelope ementation nce HN-AMDC-315229-GO-RFQ / Component 3. Project Manag Adquisición de Equipo para I Request for Quota Single Stage - One E Under Imple IDA / 64600 ement and Technical Assista Post Open - National 1,500.00 0.00 2022-09-21 2022-11-17 2022-11-18 nstalación de Internet en las tions nvelope mentation nce oficinas de la UCP/AMDC HN-AMDC-323495-GO-RFQ / Component 3. Project Manag Request for Quota Single Stage - One E Adquisición de Bienes para of IDA / 64600 ement and Technical Assista Post Open - National 2,500.00 0.00 Signed 2022-11-16 2023-01-11 2023-02-10 tions nvelope icina UCP nce HN-AMDC-323497-GO-RFQ / Component 2. Improved wat Request for Quota Single Stage - One E Pending Impl Licencias de Software para el IDA / 64600 er production capacity and e Post Open - National 15,000.00 0.00 2022-11-19 2023-01-15 2023-02-14 tions nvelope ementation Estudio Piloto de Sectorizació fficiency of the distribution n n por UMAPS etwork HN-AMDC-323501-GO-RFB / Component 2. Improved wat Single Stage - One E Pending Impl Equipamiento de laboratorio IDA / 64600 er production capacity and e Post Request for Bids Open - National 250,000.00 0.00 2023-08-07 2023-08-12 2023-09-11 2023-10-01 2023-11-14 2024-02-12 nvelope ementation de limnología fficiency of the distribution n etwork HN-AMDC-337883-GO-RFB / Component 3. Project Manag Single Stage - One E Pending Impl Adquisición de Equipo Cómp IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 60,000.00 0.00 2023-01-30 2023-02-04 2023-02-24 2023-03-11 2023-04-15 2023-07-14 nvelope ementation uto UMAPS, DCS y UCP nce HN-AMDC-323496-GO-RFB / Component 2. Improved wat Single Stage - One E Pending Impl Equipo para el Piloto de Sect IDA / 64600 er production capacity and e Post Request for Bids Open - National 190,000.00 0.00 2023-02-01 2023-02-06 2023-03-08 2023-03-23 2023-04-27 2023-07-26 nvelope ementation orización por UMAPS fficiency of the distribution n etwork HN-AMDC-337886-GO-RFQ / Component 3. Project Manag Request for Quota Single Stage - One E Pending Impl Adquisición de Equipo para c IDA / 64600 ement and Technical Assista Post Open - National 1,200.00 0.00 2023-02-11 2023-04-09 2023-04-10 tions nvelope ementation onexión de internet nce NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HN-AMDC-288633-NC-RFB / I mplementación de Campaña Component 3. Project Manag Single Stage - One E Pending Impl Piloto Informativa sobre el Pr IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 100,000.00 0.00 2022-09-01 2022-09-06 2022-10-18 2022-11-17 2022-12-22 2023-06-20 nvelope ementation oyecto para Fortalecer los Se nce rvicios de Agua Potable de Te gucigalpa HN-AMDC-139401-NC-RFB / Component 3. Project Manag Contratación de Servicios par Open - Internationa Single Stage - One E IDA / 64600 ement and Technical Assista Post Request for Bids 480,000.00 0.00 Canceled 2021-09-01 2021-09-11 2021-10-26 2021-12-02 2022-01-15 2026-01-15 a implementar la Estrategia l nvelope nce de Comunicación del Proyect o. HN-AMDC-306244-NC-RFB / Component 3. Project Manag Contratación de Servicios par Single Stage - One E Pending Impl IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 358,916.00 0.00 2023-10-02 2023-10-07 2023-11-06 2023-12-06 2024-01-10 2024-12-10 a implementar la Estrategia nvelope ementation nce de Comunicación del Proyect o HN-AMDC-306245-NC-RFQ / Component 3. Project Manag Request for Quota Single Stage - One E Pending Impl Adquisición de Promocionale IDA / 64600 ement and Technical Assista Post Open - National 10,000.00 0.00 2022-08-15 2022-09-24 2022-10-20 tions nvelope ementation s en apoyo UMGIR nce HN-AMDC-139443-NC-RFB / Servicios de implementación Component 3. Project Manag Single Stage - One E y adecuación de un Software IDA / 64600 ement and Technical Assista Post Request for Bids Open - National 50,000.00 0.00 Canceled 2020-09-15 2020-09-20 2020-10-20 2020-11-04 2020-11-26 2021-05-25 nvelope para administración de proce nce sos y contratos de la AMDC CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HN-AMDC-139433-CS-QCBS / Contratacion de servicios p Component 2. Improved wat ara el fortalecimiento de las er production capacity and e Quality And Cost- Open - Internationa Pending Impleme IDA / 64600 Post 500,000.00 0.00 2022-02-01 2022-02-15 2022-03-15 2022-04-29 2022-06-05 2022-07-10 2022-08-14 2025-01-15 capacidades municipales en fficiency of the distribution n Based Selection l ntation gestion y operaracion de las etwork represas La Concepcion y Lo s Laureles HN-AMDC-139427-CS-QCBS Component 3. Project Manag Quality And Cost- Open - Internationa / Apoyo en la gestión del Pro IDA / 64600 ement and Technical Assista Prior 1,800,000.00 0.00 Canceled 2019-10-25 2020-01-09 2019-11-15 2020-04-21 2019-12-06 2020-12-09 2020-01-20 2021-02-05 2020-02-03 2021-08-19 2020-03-02 2021-08-26 2020-03-24 2025-01-15 Based Selection l yecto (CGP) nce HN-AMDC-139452-CS-QCBS Component 2. Improved wat / Diseño (incluyendo planes d er production capacity and e Quality And Cost- e manejo ambiental y social), IDA / 64600 Post Open - National 200,000.00 0.00 Canceled 2020-01-02 2020-01-16 2020-02-29 2020-03-30 2020-04-29 2020-06-03 2020-07-08 2021-01-04 fficiency of the distribution n Based Selection para el equipamiento y mejor etwork as menores en las tres Planta s de Tratamiento HN-AMDC-139456-CS-QCBS Component 3. Project Manag Quality And Cost- / Auditoria externa financiera IDA / 64600 ement and Technical Assista Post Open - National 350,000.00 20,378.54 Completed 2019-11-04 2020-06-25 2019-11-04 2019-11-18 2020-09-11 2019-12-18 2020-10-02 2020-01-08 2020-10-30 2020-02-12 2020-12-01 2020-03-18 2021-01-16 2025-04-17 2022-07-21 Based Selection del Proyecto nce HN-AMDC-139405-CS-QCBS / Contratacion de la Agencia Component 3. Project Manag Quality And Cost- Verificadora independiente p IDA / 64600 ement and Technical Assista Post Open - National 400,000.00 0.00 Canceled 2019-10-28 2019-10-23 2019-11-11 2020-02-20 2019-12-09 2020-01-08 2020-01-29 2020-03-02 2020-04-06 2025-01-15 Based Selection ara los Indicadores vinculado nce s al desempeño del Proyecto (DLI) HN-AMDC-166651-CS-CQS / Contratación de la Agencia V Component 1. Operationaliz Consultant Qualifi erificadora independiente pa IDA / 64600 Post Open - National 400,000.00 299,670.00 Signed 2020-03-27 2020-04-07 2020-04-17 2020-04-17 2020-05-31 2020-06-30 2020-06-30 2020-08-21 2020-08-04 2020-10-02 2025-01-15 ation of the UMAPS cation Selection ra los Indicadores vinculados al desempeño del Proyecto ( DLI) HN-AMDC-176124-CS-CQS / Component 2. Improved wat Diseño (incluyendo planes de er production capacity and e Consultant Qualifi manejo ambiental y social), p IDA / 64600 Post Open - National 300,000.00 383,636.25 Signed 2020-06-05 2020-09-20 2020-06-26 2020-09-24 2020-08-09 2020-12-31 2020-09-08 2021-12-01 2020-10-13 2021-12-06 2021-06-10 fficiency of the distribution n cation Selection ara el equipamiento y mejora etwork s menores en las tres Plantas de Tratamiento Page 2 HN-AMDC-139442-CS-CQS / Component 3. Project Manag Consultant Qualifi Adquisición de Servicios para IDA / 64600 ement and Technical Assista Post Limited 100,000.00 0.00 Canceled 2020-07-01 2020-07-15 2020-08-14 2020-09-01 2021-02-28 cation Selection diseñar una Estrategia de Co nce municación HN-AMDC-139215-CS-QCBS / Diagnóstico de intervencion Component 2. Improved wat es y plan de manejo de cuen er production capacity and e Quality And Cost- Open - Internationa IDA / 64600 Prior 1,000,000.00 0.00 Canceled 2021-02-01 2021-03-03 2021-04-02 2021-05-17 2021-06-23 2021-07-24 2021-09-12 2022-03-11 cas incluyendo los estándare fficiency of the distribution n Based Selection l s sociales y ambientales en l etwork os embalses Los Laureles y L a Concepcion. HN-AMDC-194813-CS-QCBS / Consultoría para evaluación Component 2. Improved wat y actualización de diagnóstic er production capacity and e Quality And Cost- Open - Internationa IDA / 64600 Post 1,000,000.00 0.00 Canceled 2020-10-12 2020-11-02 2020-12-16 2021-01-13 2021-02-12 2021-03-19 2021-04-23 2022-04-23 o, auditoría sanitaria y ambie fficiency of the distribution n Based Selection l ntal, y propuesta de factibilid etwork ad de subcuencas de Guaceri que y Río Grande. HN-AMDC-139449-CS-QCBS Component 2. Improved wat Quality And Cost- Under Implement / Consultoría sobre Resilienci IDA / 64600 er production capacity and e Post Open - National 200,000.00 0.00 2021-11-15 2022-08-26 2021-12-15 2022-10-26 2022-01-26 2022-02-25 2022-03-27 2022-05-01 2022-06-15 2022-12-12 Based Selection ation a climática fficiency of the distribution n etwork HN-AMDC-139447-CS-QCBS Component 2. Improved wat / Estudio y diseño para el con er production capacity and e Quality And Cost- Open - Internationa Under Implement trol de la contaminación de l IDA / 64600 Post 500,000.00 0.00 2022-02-01 2022-04-19 2022-02-15 2022-12-07 2022-03-15 2023-04-11 2022-04-29 2022-05-29 2022-07-03 2022-08-07 2023-08-07 fficiency of the distribution n Based Selection l ation as Subcuencas de Guaceriqu etwork e y San José de Río Grande HN-AMDC-263486-CS-QCBS Component 3. Project Manag Quality And Cost- / Contratación de Servicios d IDA / 64600 ement and Technical Assista Post Open - National 125,000.00 123,391.22 Signed 2021-11-23 2021-12-15 2021-12-14 2022-01-27 2021-12-21 2022-02-24 2022-01-10 2022-03-26 2022-01-26 2022-04-30 2022-04-05 2022-06-04 2022-04-17 2023-06-04 Based Selection e Auditoria Externa para tres nce (3) años HN-AMDC-223184-CS-QCBS / El diseño, acompañamiento Component 3. Project Manag e implementación de la estra Quality And Cost- IDA / 64600 ement and Technical Assista Post Open - National 480,000.00 0.00 Canceled 2021-03-12 2021-07-13 2021-04-02 2021-05-16 2021-06-13 2021-07-13 2021-08-17 2021-09-21 2022-09-21 tegia de comunicación del pr Based Selection nce oyecto de fortalecimiento de suministro de agua de Teguci galpa. HN-AMDC-276603-CS-QCBS / El diseño, acompañamiento Component 3. Project Manag y monitoreo de la Estrategia Quality And Cost- Under Implement IDA / 64600 ement and Technical Assista Post Open - National 264,000.00 0.00 2022-02-15 2022-06-07 2022-03-08 2022-08-22 2022-04-21 2022-05-19 2022-06-18 2022-07-23 2022-08-27 2023-08-27 de Comunicación del proyect Based Selection ation nce o de fortalecimiento de sumi nistro de agua de Tegucigalp a. HN-AMDC-262810-CS-QCBS Component 3. Project Manag Quality And Cost- Open - Internationa / Apoyo en la Gestión del Pro IDA / 64600 ement and Technical Assista Prior 1,200,000.00 0.00 Canceled 2021-11-30 2021-12-27 2021-12-21 2022-02-03 2022-03-03 2022-04-02 2022-05-07 2022-06-11 2024-11-27 Based Selection l yecto (CGP), 2do Proceso nce HN-AMDC-288647-CS-QCBS Component 3. Project Manag Quality And Cost- Open - Internationa Under Implement / Consultoría de Gestión de P IDA / 64600 ement and Technical Assista Prior 1,050,000.00 0.00 2022-05-30 2022-06-16 2022-06-20 2022-08-24 2022-08-03 2023-02-23 2022-08-31 2023-04-13 2022-09-30 2023-06-16 2022-11-04 2022-12-09 2023-12-09 Based Selection l ation royectos (CGP) nce HN-AMDC-296100-CS-QCBS / Estudio y Diseño de Sectore Component 2. Improved wat s Hidráulicos y Programa de er production capacity and e Quality And Cost- Open - Internationa Reducción del Agua No Factu IDA / 64600 Post 1,200,000.00 0.00 Canceled 2022-05-30 2022-10-28 2022-06-20 2022-08-09 2022-08-03 2022-08-31 2022-09-30 2022-11-04 2022-12-09 2023-12-09 fficiency of the distribution n Based Selection l rada (ANF) en El Sistema El P etwork icacho y Diagnostico de las p rincipales causas de perdida de agua en los Sectores HN-AMDC-262815-CS-CQS / Estudio y Diseño de Sectores Component 2. Improved wat Hidráulicos y programa de R er production capacity and e Consultant Qualifi Open - Internationa educción del Agua no Factur IDA / 64600 Prior 1,200,000.00 0.00 Canceled 2021-12-15 2022-03-21 2022-01-05 2022-02-18 2022-03-20 2022-04-24 2023-04-24 fficiency of the distribution n cation Selection l ada (ANF) en el Sistema El Pi etwork cacho y diagnóstico de las pr incipales causas de pérdida d e agua en los sectores. HN-AMDC-293422-CS-QCBS / Supervisión de Obras de Se Component 2. Improved wat ctores Hidráulicos y reducció er production capacity and e Quality And Cost- Open - Internationa Pending Impleme IDA / 64600 Post 500,000.00 0.00 2022-10-10 2022-10-31 2022-12-14 2023-01-11 2023-02-10 2023-03-17 2023-04-21 2024-07-16 n de Agua No Facturada (ANF fficiency of the distribution n Based Selection l ntation ) para la red del Sistema de etwork Agua Potable de "El Picacho" HN-AMDC-306689-CS-QCBS / Elaboración de una evaluaci Component 2. Improved wat ón integral de riesgos para la er production capacity and e Quality And Cost- Open - Internationa Pending Impleme IDA / 64600 Prior 1,300,000.00 0.00 2022-10-17 2022-10-31 2022-12-04 2023-01-18 2023-02-02 2023-02-28 2023-03-26 2024-03-25 s represas La Concepción y L fficiency of the distribution n Based Selection l ntation os Laureles que incluye plan etwork es de seguridad y planes de acción de emergencia. HN-AMDC-139397-CS-QCBS / Elaboración de una evaluaci Component 2. Improved wat ón integral de riesgos para la er production capacity and e Quality And Cost- Open - Internationa IDA / 64600 Post 1,300,000.00 0.00 Canceled 2021-02-01 2021-02-15 2021-03-21 2021-05-05 2021-06-01 2021-07-02 2021-08-16 2022-08-16 s represas La Concepcion y L fficiency of the distribution n Based Selection l os Laureles que incluye plan etwork es de seguridad y planes de acción de emergencia. HN-AMDC-311328-CS-QCBS Component 2. Improved wat / Evaluación y actualización d er production capacity and e Quality And Cost- Open - Internationa Under Implement e Planes de manejo de las Su IDA / 64600 Post 700,000.00 0.00 2022-09-19 2022-09-14 2022-10-10 2022-10-26 2022-11-23 2022-11-28 2022-12-28 2023-01-23 2023-02-12 2024-02-12 fficiency of the distribution n Based Selection l ation b cuencas de Guacerique y S etwork an José de Rio Grande HN-AMDC-237494-CS-QCBS Component 2. Improved wat / Evaluación y Actualización er production capacity and e Quality And Cost- Open - Internationa IDA / 64600 Post 700,000.00 0.00 Canceled 2021-07-15 2021-12-15 2021-08-05 2022-01-24 2021-09-18 2021-09-23 2021-10-23 2021-11-18 2021-12-31 2022-12-31 Planes de Manejo de la Subc fficiency of the distribution n Based Selection l uencas de Guacerique y San etwork José de Río Grande. HN-AMDC-330517-CS-QCBS / Estudio y Diseño de Sectore s Hidráulicos y Programa de Component 2. Improved wat Reducción del Agua no Factu er production capacity and e Quality And Cost- Open - Internationa Under Implement IDA / 64600 Prior 1,200,000.00 0.00 2022-12-19 2022-12-15 2023-01-09 2023-01-23 2023-02-22 2023-05-24 2023-03-22 2023-04-21 2023-05-26 2023-06-30 2024-06-29 rada (ANF) en los sistemas El fficiency of the distribution n Based Selection l ation Picacho, Los Laureles y la Co etwork ncepción y Diagnóstico de la s principales causas de pérdi da de agua en los sectores HN-AMDC-353043-CS-CQS / Component 2. Improved wat Supervisión de las mejoras d er production capacity and e Consultant Qualifi Under Implement IDA / 64600 Post Open - National 290,000.00 0.00 2023-04-10 2023-04-27 2023-05-01 2023-06-14 2023-07-14 2023-08-18 2024-06-18 e la Planta de Tratamiento de fficiency of the distribution n cation Selection ation Agua Potable El Picacho etwork Page 3 HN-AMDC-323706-CS-QCBS Component 2. Improved wat / Supervisión de las mejoras er production capacity and e Quality And Cost- Open - Internationa Pending Impleme IDA / 64600 Post 610,000.00 0.00 2022-11-28 2022-12-19 2023-02-01 2023-03-01 2023-03-31 2023-05-05 2023-06-09 2024-07-31 de las plantas de tratamiento fficiency of the distribution n Based Selection l ntation de Agua Potable Los Laureles etwork y La Concepción INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HN-AMDC-139448-CS-INDV / Component 3. Project Manag Individual Consult Pending Impleme Estudio para Fortalecer el pa IDA / 64600 ement and Technical Assista Post Open 20,000.00 0.00 2021-06-01 2021-07-11 2021-07-25 2021-08-14 2022-02-10 ant Selection ntation pel de COMAS nce HN-AMDC-139435-CS-INDV / Seleccion de servicios para Id Component 3. Project Manag Individual Consult Pending Impleme entificar potenciales mecanis IDA / 64600 ement and Technical Assista Post Open 40,000.00 0.00 2021-06-01 2021-07-04 2021-07-19 2021-08-08 2022-08-08 ant Selection ntation mos de financiación de obras nce de infraestructura mayor HN-AMDC-139407-CS-INDV / Component 3. Project Manag Individual Consult Especialistas en Estándares IDA / 64600 ement and Technical Assista Post Limited 185,000.00 115,200.00 Signed 2019-11-04 2019-10-31 2019-11-09 2020-03-12 2019-12-09 2020-06-23 2020-01-13 2020-07-01 2025-01-15 ant Selection Ambientales del Proyecto nce HN-AMDC-139426-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Post Limited 180,000.00 74,000.00 Completed 2019-11-04 2019-10-31 2019-11-09 2020-04-20 2019-12-09 2020-06-23 2020-01-04 2020-07-01 2025-01-15 2022-03-02 Especialistas en Estándares S ement and Technical Assista ant Selection ociales nce HN-AMDC-139412-CS-INDV / Component 3. Project Manag Individual Consult Especialistas en Gestión de IDA / 64600 ement and Technical Assista Post Limited 185,000.00 32,400.00 Completed 2020-08-03 2020-04-02 2020-08-08 2020-04-21 2020-09-17 2020-06-23 2020-10-07 2020-07-01 2023-12-22 2021-05-14 ant Selection Mano de Obra nce HN-AMDC-139226-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Prior Open 180,000.00 36,000.00 Completed 2019-10-18 2019-10-28 2019-11-22 2020-02-14 2019-11-29 2020-02-25 2019-12-03 2020-02-20 2025-01-15 2021-02-20 Especialista en Adquisiciones ement and Technical Assista ant Selection -UCP nce HN-AMDC-139227-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Post Open 195,000.00 134,400.00 Completed 2019-10-18 2019-10-16 2019-11-22 2020-02-13 2019-11-29 2020-01-14 2019-12-03 2020-02-21 2025-01-15 Especialista Financiero-UCP ement and Technical Assista ant Selection nce HN-AMDC-139225-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Post Open 250,000.00 45,600.00 Signed 2019-10-18 2019-11-22 2019-11-22 2020-02-12 2019-11-29 2020-02-12 2019-12-03 2020-02-20 2025-01-15 2021-02-20 Coordinador Proyecto (UCP) ement and Technical Assista ant Selection nce HN-AMDC-139220-CS-INDV / Component 2. Improved wat Especialista en RCC para la P er production capacity and e Individual Consult IDA / 64600 Post Open 100,000.00 0.00 Canceled 2021-01-15 2020-10-18 2021-03-05 2021-03-26 2021-04-30 2025-01-15 resa Concepción parte del Pa fficiency of the distribution n ant Selection nel de expertos (PdE) etwork HN-AMDC-160247-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Post Open 115,000.00 115,200.00 Signed 2020-02-18 2020-04-20 2020-03-29 2020-05-07 2020-04-19 2020-07-31 2020-05-19 2020-08-08 2025-03-07 Especialista en Agua y Sanea ement and Technical Assista ant Selection miento nce HN-AMDC-194814-CS-INDV / Component 3. Project Manag Individual Consult Especialista en Monitoreo y E IDA / 64600 ement and Technical Assista Post Open 192,000.00 76,800.00 Signed 2020-09-25 2020-10-14 2020-11-13 2020-11-05 2020-12-04 2020-11-18 2021-01-08 2020-11-25 2021-07-07 ant Selection valuación-UCP nce HN-AMDC-217174-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Post Open 179,000.00 59,400.00 Signed 2021-02-15 2021-05-12 2021-04-05 2021-03-31 2021-04-26 2021-04-30 2021-05-31 2021-05-05 2021-11-27 Coordinador del Proyecto ement and Technical Assista ant Selection nce HN-AMDC-222635-CS-CDS / Component 3. Project Manag Consultoría para elaborar pla IDA / 64600 ement and Technical Assista Post Direct Selection Direct 5,000.00 4,968.00 Signed 2021-03-19 2021-07-16 2021-03-29 2021-09-22 2021-06-02 2022-01-14 2021-11-29 n de medios y pauta para ca nce mpaña piloto sobre agua en 2021 HN-AMDC-228309-CS-INDV / Component 3. Project Manag Individual Consult Especialista en Adquisiciones IDA / 64600 ement and Technical Assista Prior Open 141,500.00 38,400.00 Completed 2021-04-14 2021-06-15 2021-05-18 2021-08-24 2021-05-23 2021-09-02 2021-06-07 2021-09-04 2025-02-11 2022-09-09 ant Selection -UCP (2do Proceso) nce HN-AMDC-139432-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Post Open 115,000.00 0.00 Canceled 2019-11-22 2020-01-09 2020-01-01 2020-01-22 2020-02-21 2025-01-19 Especialista en Agua y Sanea ement and Technical Assista ant Selection miento nce HN-AMDC-237485-CS-INDV / Component 3. Project Manag Especialista en Gestión de M Individual Consult IDA / 64600 ement and Technical Assista Post Open 163,000.00 0.00 Canceled 2021-06-23 2021-07-14 2021-08-02 2021-08-11 2021-09-06 2025-02-28 ano de Obra (Seguridad y sal ant Selection nce ud ocupacional) HN-AMDC-247113-CS-INDV / Component 3. Project Manag Oficial Comunitario Proyecto: Individual Consult IDA / 64600 ement and Technical Assista Post Limited 100,000.00 0.00 Signed 2021-09-01 2021-12-20 2021-09-06 2023-02-06 2021-09-27 2023-02-24 2021-11-01 2024-12-31 Mejoramiento de los Servicio ant Selection nce s de Agua Potable en Teguci galpa HN-AMDC-206749-CS-INDV / Component 2. Improved wat Ingeniero Hidromecánico par er production capacity and e Individual Consult IDA / 64600 Post Open 100,000.00 0.00 Canceled 2020-12-15 2020-12-16 2021-02-08 2021-03-01 2021-04-05 2021-10-02 a las represas Los Laureles y fficiency of the distribution n ant Selection La Concepción parte del Pan etwork el de expertos (PdE). HN-AMDC-139222-CS-INDV / Component 2. Improved wat Especialista en geotecnia par er production capacity and e Individual Consult IDA / 64600 Post Open 100,000.00 0.00 Canceled 2021-01-15 2020-10-18 2021-03-05 2021-03-26 2021-04-30 2025-01-15 a las presas - parte del Panel fficiency of the distribution n ant Selection de expertos (PdE) etwork HN-AMDC-139223-CS-INDV / Component 2. Improved wat Especialista en instrumentaci er production capacity and e Individual Consult IDA / 64600 Post Open 100,000.00 0.00 Canceled 2021-01-15 2020-10-18 2021-03-05 2021-03-26 2021-04-30 2025-01-15 ón / seguridad y mecánica. p fficiency of the distribution n ant Selection ara las presas parte del Pane etwork l de expertos (PdE) HN-AMDC-139451-CS-INDV / Component 2. Improved wat Consultoría - Especialista en er production capacity and e Individual Consult IDA / 64600 Post Open 100,000.00 0.00 Canceled 2021-01-15 2020-10-18 2021-02-24 2021-03-17 2021-04-14 2025-01-15 hidrología para las Presas pa fficiency of the distribution n ant Selection rte del Panel de expertos (Pd etwork E) HN-AMDC-247115-CS-INDV / Component 2. Improved wat Ingeniero Hidromecánico par er production capacity and e Individual Consult a las Represas Los Laureles y IDA / 64600 Post Open 87,500.00 0.00 Signed 2021-08-16 2021-12-15 2021-10-04 2022-12-16 2021-10-25 2022-12-23 2021-11-29 2024-12-31 fficiency of the distribution n ant Selection La Concepción por parte del etwork Panel de Expertos (PdE) HN-AMDC-247117-CS-INDV / Component 2. Improved wat Especialista en Geotecnia par er production capacity and e Individual Consult IDA / 64600 Post Open 87,500.00 0.00 Signed 2021-08-16 2021-12-15 2021-10-04 2022-12-07 2021-10-25 2022-12-26 2021-11-29 2024-12-31 a las Presas - Parte del Panel fficiency of the distribution n ant Selection de Expertos (PdE) etwork Page 4 HN-AMDC-247118-CS-INDV / Component 2. Improved wat Especialista en Instrumentaci er production capacity and e Individual Consult IDA / 64600 Post Open 87,500.00 0.00 Signed 2021-08-16 2021-12-15 2021-10-04 2022-12-09 2021-10-25 2022-12-23 2021-11-29 2024-12-31 ón / Seguridad y Mecánica, p fficiency of the distribution n ant Selection ara las Presas Parte del Panel etwork de Expertos (PdE) HN-AMDC-262819-CS-INDV / Component 3. Project Manag Individual Consult Contratación de Técnico de A IDA / 64600 ement and Technical Assista Post Open 54,000.00 21,600.00 Signed 2021-11-22 2022-03-02 2022-01-10 2022-05-09 2022-01-31 2022-07-21 2022-03-07 2022-07-31 2024-12-31 ant Selection dquisiciones 2021-2024 nce HN-AMDC-263488-CS-INDV / Component 3. Project Manag Contratación de Especialista Individual Consult IDA / 64600 ement and Technical Assista Post Open 108,800.00 36,000.00 Signed 2021-11-22 2022-03-11 2022-01-10 2022-07-12 2022-01-31 2022-08-05 2022-03-07 2022-08-14 2022-09-03 en Mano de Obra (Seguridad ant Selection nce y Salud Ocupacional) HN-AMDC-139438-CS-INDV / Component 3. Project Manag Diagnostico y Propuestas de Individual Consult Pending Impleme IDA / 64600 ement and Technical Assista Post Open 20,000.00 0.00 2020-11-01 2020-12-11 2020-12-26 2021-01-14 2021-05-14 Capacitación de Estándares a ant Selection ntation nce mbientales y sociales de la A MDC/UMAPS HN-AMDC-139450-CS-INDV / Component 3. Project Manag Contratación de servicios par Individual Consult Pending Impleme IDA / 64600 ement and Technical Assista Post Open 40,000.00 0.00 2021-01-03 2021-02-21 2021-03-14 2021-04-18 2021-08-16 a preparar un análisis integra ant Selection ntation nce l de brechas de género HN-AMDC-288651-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Post Open - National 96,000.00 0.00 Signed 2022-07-22 2022-08-09 2022-09-09 2023-02-03 2022-09-30 2023-02-03 2022-11-04 2023-05-03 Especialista en Desarrollo So ement and Technical Assista ant Selection cial nce HN-AMDC-306725-CS-INDV / Servicios de desarrollo e impl Component 3. Project Manag Individual Consult Pending Impleme ementación de un Software p IDA / 64600 ement and Technical Assista Post Open - National 50,000.00 0.00 2022-09-01 2022-10-22 2022-11-05 2022-12-10 2023-06-08 ant Selection ntation ara administración de proces nce os y contratos de la AMDC HN-AMDC-315103-CS-INDV / Component 2. Improved wat Consultoría - Especialista en er production capacity and e Individual Consult Open - Internationa IDA / 64600 Post 60,000.00 0.00 Signed 2022-09-19 2022-09-14 2022-11-07 2022-12-21 2022-11-28 2023-01-27 2023-01-02 2024-12-31 Hidrología Para Seguridad de fficiency of the distribution n ant Selection l presas parte del Panel de Ex etwork pertos (PdE) HN-AMDC-247119-CS-INDV / Component 2. Improved wat Consultoría - Especialista en er production capacity and e Individual Consult IDA / 64600 Post Open 87,500.00 0.00 Canceled 2021-08-16 2021-12-15 2021-10-04 2021-10-25 2021-11-29 2024-12-31 Hidrología para las Presas Pa fficiency of the distribution n ant Selection rte del Panel de Expertos (Pd etwork E) HN-AMDC-315102-CS-INDV / Component 3. Project Manag Individual Consult IDA / 64600 Prior Open - National 103,380.00 0.00 Signed 2022-09-30 2022-10-17 2022-11-18 2023-01-17 2022-12-09 2023-01-31 2023-01-13 2023-07-12 Especialista en Adquisiciones ement and Technical Assista ant Selection nce HN-AMDC-323485-CS-INDV / Component 2. Improved wat Individual Consult Under Implement Consultoría Social en el estud IDA / 64600 er production capacity and e Post Open - National 17,200.00 0.00 2022-11-07 2023-03-13 2022-12-26 2023-01-16 2023-02-20 2023-06-20 ant Selection ation io piloto de sectorización par fficiency of the distribution n a la UMAPS etwork HN-AMDC-323488-CS-INDV / Component 2. Improved wat Consultoría Ambiental en el er production capacity and e Individual Consult Under Implement IDA / 64600 Post Open - National 10,000.00 0.00 2022-11-07 2023-01-26 2022-12-26 2023-01-16 2023-02-20 2023-06-20 estudio piloto de sectorizació fficiency of the distribution n ant Selection ation n para la UMAPS etwork HN-AMDC-323490-CS-INDV / Component 2. Improved wat Consultoría en Sistemas de I er production capacity and e Individual Consult Under Implement IDA / 64600 Post Open - National 10,000.00 0.00 2022-11-07 2023-03-13 2022-12-26 2023-01-16 2023-02-20 2023-06-20 nformación Geográfico en el fficiency of the distribution n ant Selection ation estudio piloto de sectorizació etwork n para la UMAPS HN-AMDC-323491-CS-INDV / Component 2. Improved wat Consultoría en Ingeniería civil er production capacity and e Individual Consult Under Implement IDA / 64600 Post Open - National 10,000.00 0.00 2022-11-07 2023-01-26 2022-12-26 2023-01-16 2023-02-20 2023-06-20 / hidráulica en el estudio pilot fficiency of the distribution n ant Selection ation o de sectorización para la UM etwork APS HN-AMDC-323493-CS-INDV / Component 3. Project Manag Individual Consult Under Implement Técnico en Administración de IDA / 64600 ement and Technical Assista Post Open - National 41,400.00 0.00 2022-11-21 2023-01-17 2023-01-09 2023-01-30 2023-03-06 2024-12-31 ant Selection ation contratos para la UCP nce HN-AMDC-361170-CS-INDV / Component 3. Project Manag Individual Consult Under Implement IDA / 64600 Post Limited 77,000.00 0.00 2023-05-29 2023-05-23 2023-06-03 2023-06-24 2023-07-29 2025-05-30 Especialista Financiero 2do P ement and Technical Assista ant Selection ation roceso nce Page 5 PROCUREMENT PLAN (Textual Part) Project information: [Kenya] [Kenya Marine Fisheries Development] [P-163980] Project Implementation agency: [Ministry of Agriculture, Livestock and Fisheries Development] Date of the Procurement Plan: [December 2017] Period covered by this Procurement Plan: [December 2017 – December 2018] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Part IX, Article 96 of the Public Procurement & Asset Disposal Act 2015 and the associated Regulations, , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. • The request for bids/proposals document shall require that bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; • The rights for the Bank to review procurement documentation and activities; When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Proposed Procedures for CDD Components (as per paragraph. 6.52 and Annex III, paragraphs 6.9 and 6.10 of the World Bank Procurement Regulations for IPF Borrowers, dated July 2016) Other Relevant Procurement Information. None PROCUREMENT Kenya : Marine Fisheries and Socio-Economic Development Project PLAN General Information Country: Kenya 2022-02-01 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163980 GPN Date: 2018-01-04 Project Name: Marine Fisheries and Socio-Economic Development Project Loan / Credit No: IDA / 65400 Kwale County Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-KWALE-KEMFSED-001/20 Component 2 - Coastal Com Request for Quota Single Stage - One E Under Imple 22-GO-RFQ / SUPPLY AND DE IDA / 65400 munity Empowerment and Li Post Limited 49,100.00 0.00 2022-03-04 2022-04-27 2022-04-20 2022-04-25 tions nvelope mentation LIVERY OF IEC MATERIALS A velihoods ND PRINTING KE-KWALE-KEMFSED-003-20 Component 2 - Coastal Com Request for Quota Single Stage - One E Under Imple 22-GO-RFQ / SUPPLY AND DE IDA / 65400 munity Empowerment and Li Post Limited 39,360.00 0.00 2022-03-04 2022-04-08 2022-04-20 2022-04-25 tions nvelope mentation LIVERY OF ICT EQUIPMENTS velihoods AND ICT SUPPORT KE-KWALE-KEMFSED-002-20 Component 2 - Coastal Com Request for Quota Single Stage - One E 22-GO-RFQ / SUPPLY AND DE IDA / 65400 munity Empowerment and Li Post Limited 37,000.00 26,105.26 Completed 2022-03-04 2022-02-25 2022-04-20 2022-04-06 2022-04-25 2022-04-12 tions nvelope LIVERY OF FURNITURE velihoods KE-KWALE COUNTY-313322- Component 3 - Project Mana Request for Quota Single Stage - One E Under Imple GO-RFQ / GENERAL OFFICE S IDA / 65400 gement, and Monitoring and Post Limited 12,000.00 0.00 2022-10-26 2022-10-26 2022-12-22 2023-01-09 tions nvelope mentation UPPLIES Evaluation KE-KWALE COUNTY-313297- GO-RFQ / PURCHASE OF COM Component 2 - Coastal Com Request for Quota Single Stage - One E PUTERS,PRINTERS AND OTHE IDA / 65400 munity Empowerment and Li Post Limited 36,270.00 0.00 Completed 2022-12-09 2022-12-09 2023-02-14 2023-04-04 tions nvelope R INFORMATION COMPUTER velihoods TECHNOLOGY EQUIPMENTS KE-KWALE COUNTY-313303- Component 2 - Coastal Com GO-RFQ / PURCHASE OF INFO Request for Quota Single Stage - One E IDA / 65400 munity Empowerment and Li Post Limited 33,950.00 0.00 Completed 2022-12-09 2022-12-09 2023-02-14 2023-04-04 RMATION EDUCATION COMM tions nvelope velihoods UNICATION MATERIALS KE-KWALE COUNTY-317951- Component 2 - Coastal Com Request for Quota Single Stage - One E GO-RFQ / PURCHASE OF GEN IDA / 65400 munity Empowerment and Li Post Limited 16,000.00 0.00 Completed 2022-12-09 2022-12-09 2023-02-14 2023-04-04 tions nvelope ERAL OFFICE SUPPLIES C2 velihoods KE-KWALE COUNTY-359017- Component 3 - Project Mana Request for Quota Single Stage - One E Pending Impl GO-RFQ / SUPPLY AND DELIV IDA / 65400 gement, and Monitoring and Post Limited 12,000.00 0.00 2023-05-03 2023-06-15 2023-06-25 tions nvelope ementation ERY OF GENERAL OFFICE SUP Evaluation PLIES C3 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 PROCUREMENT PLAN (Textual Part) Project information: Pakistan Punjab Rural Sustainable Water Supply and Sanitation Project (P169071) Project Implementation agency: Local Government Department Date of the Procurement Plan: April 15, 2022 Period covered by this Procurement Plan: April 2022- December 2025 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Procurement Rules 2004 Revised 2020, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 2) For national open competitive procurement, only the model procurement documents acceptable to the World Bank, shall be used. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) Access to procurement opportunities shall not be restricted to firms that have pre-registered and/or paid a registration fee. 6) No preference of any kind shall be given to national bidders in the bidding process. 7) Procurement methods that use two-envelope process and rated criteria shall be subject to Bank’s prior concurrence When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Pakistan : Punjab Rural Sustainable Water Supply and Sanitation Project PLAN General Information Country: Pakistan 2022-04-15 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169071 GPN Date: 2021-04-22 Project Name: Punjab Rural Sustainable Water Supply and Sanitation Project Loan / Credit No: IBRD / 92670, IDA / 69250 Local Government and Community Development Department, Government of Punjab Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure PK-LG& CD-289259-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-10-1 / Pilot Scheme Provision of W IBRD / 92670 Post Request for Bids Open - National 1 Envelope proce 2,000,000.00 0.00 2023-01-02 2023-01-07 2023-02-18 2023-03-20 2023-04-24 Infrastructure Development nvelope lementation 5 ater supply & Sanitation (Nor ss (Non Bank-SPD th) / W ) National Procure PK-LG& CD-289261-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-10-1 / Pilot Scheme Provision of W IBRD / 92670 Post Request for Bids Open - National 1 Envelope proce 2,000,000.00 0.00 2023-01-05 2023-01-10 2023-02-21 2023-03-23 2023-04-27 Infrastructure Development nvelope lementation 8 ater supply & Sanitation (Cen ss (Non Bank-SPD tral) / W ) National Procure PK-LG& CD-289264-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-10-1 / Pilot Scheme Provision of W IBRD / 92670 Post Request for Bids Open - National 1 Envelope proce 2,000,000.00 0.00 2023-01-06 2023-01-11 2023-02-22 2023-03-24 2023-04-28 Infrastructure Development nvelope lementation 9 ater Supply & Sanitation (Sou ss (Non Bank-SPD th ) / W ) Request for Quota PK-LG& CD-315561-GO-RFQ Water Supply and Sanitation Request for Quota Single Stage - One E tions - Small Work Pending Imp 2023-05-1 / Rehabilitation of Water Sup IBRD / 92670 Post Open - National 330,000.00 0.00 2022-10-05 2022-11-14 Infrastructure Development tions nvelope s (Emergency) SP lementation 3 ply Schemes D -Competitive National Procure PK-LG& CD-349521-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-03-2 / Procurement of Civil Works IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 3,200,000.00 0.00 2023-03-20 2023-04-03 2023-03-24 2023-04-03 2023-04-14 2023-05-02 2023-04-24 2023-05-26 Infrastructure Development nvelope mentation 1 of Priority Villages Central-I ( ss (Non Bank-SPD Tehsil Bhowana) ) National Procure PK-LG& CD-349557-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-03-2 / Procurement of Civil Works IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,800,000.00 0.00 2023-03-20 2023-04-03 2023-03-24 2023-04-03 2023-04-14 2023-05-02 2023-04-24 2023-05-26 Infrastructure Development nvelope mentation 1 of Priority Villages Central-II ( ss (Non Bank-SPD Tehsil Pakpattan) ) National Procure PK-LG& CD-349583-CW-RFB ment Document - / Procurement of Civil Works Water Supply and Sanitation Single Stage - One E Under Imple 2024-03-2 IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,100,000.00 0.00 2023-03-20 2023-04-03 2023-03-24 2023-04-03 2023-04-14 2023-05-02 2023-04-24 2023-05-26 of Priority Villages South-I (T Infrastructure Development nvelope mentation 1 ss (Non Bank-SPD ehsil Bahawalnagar) ) National Procure PK-LG& CD-349597-CW-RFB ment Document - / Procurement of Civil Works Water Supply and Sanitation Single Stage - One E Under Imple 2024-03-2 IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,000,000.00 0.00 2023-03-20 2023-04-03 2023-03-24 2023-04-03 2023-04-14 2023-05-02 2023-04-24 2023-05-26 of Priority Villages South-I (T Infrastructure Development nvelope mentation 1 ss (Non Bank-SPD ehsil Khairpur Tamewali) ) National Procure PK-LG& CD-349608-CW-RFB ment Document - / Procurement of Civil Works Water Supply and Sanitation Single Stage - One E Under Imple 2024-03-2 IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,200,000.00 0.00 2023-03-20 2023-04-03 2023-03-24 2023-04-03 2023-04-14 2023-05-02 2023-04-24 2023-05-26 of Priority Villages South-II (T Infrastructure Development nvelope mentation 1 ss (Non Bank-SPD ehsil Kahror Pakka) ) National Procure PK-LG& CD-349614-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E 2024-03-2 / Procurement of Civil Works IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,700,000.00 0.00 Canceled 2023-03-20 2023-04-03 2023-03-24 2023-04-03 2023-04-14 2023-05-02 2023-04-24 2023-05-26 Infrastructure Development nvelope 1 of Priority Villages South-III (T ss (Non Bank-SPD ehsil Liaqatpur) ) National Procure PK-LG& CD-349619-CW-RFB ment Document - / Procurement of Civil Works Water Supply and Sanitation Single Stage - One E Under Imple 2024-03-2 IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 2,500,000.00 0.00 2023-03-20 2023-04-03 2023-03-24 2023-04-03 2023-04-14 2023-05-02 2023-04-24 2023-05-26 of Priority Villages North (Teh Infrastructure Development nvelope mentation 1 ss (Non Bank-SPD sil Kallar Kahar and Kot Momi ) n) National Procure PK-LG& CD-359416-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-05-0 / Procurement of Civil Works IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 3,300,000.00 0.00 2023-05-04 2023-05-07 2023-05-08 2023-05-08 2023-05-29 2023-05-30 2023-06-08 2023-07-10 Infrastructure Development nvelope mentation 5 of Priority Villages (Tehsil Bh ss (Non Bank-SPD awana 02) ) National Procure PK-LG& CD-359417-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-05-0 / Procurement of Civil Works IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 3,600,000.00 0.00 2023-05-04 2023-05-04 2023-05-08 2023-05-08 2023-05-29 2023-05-30 2023-06-08 2023-07-10 Infrastructure Development nvelope mentation 5 of Priority Villages (Khairpur ss (Non Bank-SPD Tamewali 02) ) National Procure PK-LG& CD-359419-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-05-0 / Procurement of Civil Works IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 4,200,000.00 0.00 2023-05-04 2023-05-04 2023-05-08 2023-05-08 2023-05-29 2023-05-30 2023-06-08 2023-07-10 Infrastructure Development nvelope mentation 5 of Priority Villages (Tehsil Ka ss (Non Bank-SPD hror Pakka 02) ) National Procure PK-LG& CD-359420-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-05-0 / Procurement of Civil Works IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 7,600,000.00 0.00 2023-05-04 2023-05-04 2023-05-08 2023-05-08 2023-05-29 2023-05-30 2023-06-08 2023-07-10 Infrastructure Development nvelope mentation 5 of Priority Villages (Tehsil Lia ss (Non Bank-SPD quatpur 02) ) National Procure PK-LG& CD-359421-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-05-0 / Procurement of Civil Works IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 5,200,000.00 0.00 2023-05-04 2023-05-04 2023-05-08 2023-05-08 2023-05-29 2023-05-30 2023-06-08 2023-07-10 Infrastructure Development nvelope mentation 5 of Priority Villages (Tehsil Kot ss (Non Bank-SPD Momin 02) ) National Procure PK-LG& CD-366683-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,250,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-20 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 Central-I, Tehsil Ahmedpur Si ss (Non Bank-SPD al (APS-01) ) National Procure PK-LG& CD-366693-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,510,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-20 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 Central-I, Tehsil Ahmedpur Si ss (Non Bank-SPD al (APS-02) ) National Procure PK-LG& CD-366694-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 2,050,000.00 0.00 Canceled 2023-06-14 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope 5 South-III, Tehsil Rojhan (ROJ- ss (Non Bank-SPD 01) ) National Procure PK-LG& CD-366695-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 600,000.00 0.00 Canceled 2023-06-14 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope 5 South-III, Tehsil Rojhan (ROJ- ss (Non Bank-SPD 02) ) National Procure PK-LG& CD-366696-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 960,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 South-III, Tehsil Rojhan (ROJ- ss (Non Bank-SPD 03) ) National Procure PK-LG& CD-366697-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,360,000.00 0.00 2023-06-14 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope lementation 5 South-III, Tehsil Liaquatpur (L ss (Non Bank-SPD QR-01) ) Page 1 National Procure PK-LG& CD-366698-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,500,000.00 0.00 2023-06-14 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope lementation 5 South-I, Tehsil Bahawalnagar ss (Non Bank-SPD (BWN-02) ) National Procure PK-LG& CD-366699-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,050,000.00 0.00 2023-06-14 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope lementation 5 South-I, Tehsil Bahawalnagar ss (Non Bank-SPD (BWN-03) ) National Procure PK-LG& CD-366701-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,750,000.00 0.00 2023-06-14 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope lementation 5 South-I, Tehsil Bahawalnagar ss (Non Bank-SPD (BWN-04) ) National Procure PK-LG& CD-366702-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 2,200,000.00 0.00 2023-06-14 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope lementation 5 South-I, Tehsil Bahawalnagar ss (Non Bank-SPD (BWN-05) ) National Procure PK-LG& CD-366704-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,600,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 South-II, Tehsil Shujaabad (SJ ss (Non Bank-SPD D-01) ) National Procure PK-LG& CD-366706-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,700,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 South-II, Tehsil Shujaabad (SJ ss (Non Bank-SPD D-02) ) National Procure PK-LG& CD-366707-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,900,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 South-II, Tehsil Shujaabad (SJ ss (Non Bank-SPD D-03) ) National Procure PK-LG& CD-366708-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,350,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 South-II, Tehsil Shujaabad (SJ ss (Non Bank-SPD D-04) ) National Procure PK-LG& CD-366711-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Pending Imp 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 750,000.00 0.00 2023-06-14 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope lementation 5 North, Tehsil Noorpur Thal (N ss (Non Bank-SPD PT-01) ) National Procure PK-LG& CD-366713-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 2,850,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 North, Tehsil Isa Khel (ISK-01 ss (Non Bank-SPD ) ) National Procure PK-LG& CD-366715-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 2,150,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 North, Tehsil Isa Khel (ISK-02 ss (Non Bank-SPD ) ) National Procure PK-LG& CD-366716-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 2,250,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 North, Tehsil Isa Khel (ISK-03 ss (Non Bank-SPD ) ) National Procure PK-LG& CD-366717-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,900,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 Central-II, Tehsil Pakpattan (P ss (Non Bank-SPD KN-02) ) National Procure PK-LG& CD-366718-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,500,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 Central-II, Tehsil Pakpattan (P ss (Non Bank-SPD KN-03) ) National Procure PK-LG& CD-366719-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,200,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 Central-II, Tehsil Pakpattan (P ss (Non Bank-SPD KN-04) ) National Procure PK-LG& CD-366720-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 1,650,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 Central-II, Tehsil Pakpattan (P ss (Non Bank-SPD KN-05) ) National Procure PK-LG& CD-366721-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 700,000.00 0.00 2023-06-14 2023-06-15 2023-06-18 2023-06-18 2023-07-09 2023-07-19 2023-08-30 Infrastructure Development nvelope mentation 5 Central-II, Tehsil Pakpattan (P ss (Non Bank-SPD KN-06) ) National Procure PK-LG& CD-366916-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 950,000.00 0.00 2023-06-15 2023-06-15 2023-06-19 2023-06-18 2023-07-10 2023-07-20 2023-08-31 Infrastructure Development nvelope mentation 6 South-III, Tehsil Rojhan (ROJ- ss (Non Bank-SPD 02) ) National Procure PK-LG& CD-366917-CW-RFB ment Document - Water Supply and Sanitation Single Stage - One E Under Imple 2024-06-2 / Procurement of Civil Works, IDA / 69250 Post Request for Bids Open - National 1 Envelope proce 2,860,000.00 0.00 2023-06-15 2023-06-15 2023-06-19 2023-06-18 2023-07-10 2023-07-20 2023-08-31 Infrastructure Development nvelope mentation 6 South-III, Tehsil Rojhan (ROJ- ss (Non Bank-SPD 01) ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LG& CD-289353-GO-RFQ Request for Quota Single Stage - One E Pending Impl IBRD / 92670 Project Management Post Open - National 80,000.00 0.00 2022-05-07 2022-06-11 2022-09-09 / Procurement of Office Equip tions nvelope ementation ment/G PK-LG& CD-289354-GO-RFQ Request for Quota Single Stage - One E Pending Impl IBRD / 92670 Project Management Post Open - National 100,000.00 0.00 2022-05-09 2022-06-09 2022-08-08 / Procurement of Office Furni tions nvelope ementation ture /G PK-LG& CD-289355-GO-RFQ Request for Quota Single Stage - One E Pending Impl IBRD / 92670 Project Management Post Open - National 400,000.00 0.00 2022-05-13 2022-06-17 2022-12-14 / Procurement of Operational tions nvelope ementation Vehicles PK-LG& CD-289352-GO-RFB Single Stage - One E Pending Impl IBRD / 92670 Project Management Post Request for Bids Open - National 200,000.00 0.00 2022-04-29 2022-05-04 2022-05-25 2022-05-30 2022-06-13 2022-09-11 / Procurement of IT Equipme nvelope ementation nt /G PK-LG& CD-315566-GO-RFQ Service Delivery Improveme Request for Quota Single Stage - One E IBRD / 92670 Post Open - National 12,100.00 0.00 Signed 2022-09-24 2023-05-23 2022-10-09 2022-11-08 / Package-V: Chlorine Tablets nt tions nvelope PK-LG& CD-315555-GO-RFQ Service Delivery Improveme Request for Quota Single Stage - One E / Procurement of double cabi IDA / 69250 Post Open - National 110,000.00 0.00 Signed 2022-09-24 2023-05-24 2022-10-08 2022-12-07 nt tions nvelope n 4x4 vehicles PK-LG& CD-315558-GO-RFQ Service Delivery Improveme Request for Quota Single Stage - One E Pending Impl IDA / 69250 Post Open - National 85,000.00 0.00 2022-09-26 2022-10-10 2022-11-24 / Procurement of Equipment nt tions nvelope ementation Page 2 PK-LG& CD-316170-GO-DIR / Service Delivery Improveme Under Imple IDA / 69250 Post Direct Selection Direct - National 1,450,000.00 0.00 2022-09-16 2022-11-01 2022-09-21 2022-11-10 2022-09-30 2023-01-28 Procurement of Heavy Machi nt mentation nery PK-LG& CD-316171-GO-RFQ Water Supply and Sanitation Request for Quota Single Stage - One E Pending Impl / Procurement of Water Filtra IDA / 69250 Prior Open - National 2,100,000.00 0.00 2022-09-24 2022-10-09 2022-12-08 Infrastructure Development tions nvelope ementation tion Systems PK-LG& CD-316174-GO-RFQ Service Delivery Improveme Request for Quota Single Stage - One E IDA / 69250 Post Open - National 90,000.00 0.00 Signed 2022-09-27 2023-05-23 2022-10-10 2022-10-11 / Procurement of Generators nt tions nvelope PK-LG& CD-289345-GO-RFB / Design, Supply and Installat Single Stage - One E Under Imple IBRD / 92670 Project Management Prior Request for Bids Open - National 3,000,000.00 0.00 2022-09-15 2022-09-20 2022-11-01 2022-12-01 2023-01-05 2024-06-28 ion of Enterprise Resource Pl nvelope mentation anning [ERP] and Manageme nt Information System PK-LG& CD-317580-GO-RFQ / Procurement of Goods for R Request for Quota Single Stage - One E Under Imple IDA / 69250 Project Management Post Open - National 96,000.00 0.00 2022-10-29 2022-11-28 2023-03-28 enovation of PRSC Head Offic tions nvelope mentation e and Miscellaneous Item PK-LG& CD-325075-GO-RFQ Request for Quota Single Stage - One E Under Imple / procurement of Office Furni IDA / 69250 Project Management Post Open - National 85,000.00 0.00 2022-11-15 2023-05-27 2022-12-07 2023-02-05 tions nvelope mentation ture for PRMSC Tehsil Offices PK-LG& CD-325076-GO-RFQ Request for Quota Single Stage - One E Under Imple / Procurement of General Offi IDA / 69250 Project Management Post Open - National 50,000.00 0.00 2022-11-17 2023-05-27 2022-12-14 2023-01-13 tions nvelope mentation ce Equipment PK-LG& CD-325074-GO-RFQ Request for Quota Single Stage - One E Pending Impl / Procurement of Printing and IDA / 69250 Project Management Post Open - National 85,000.00 0.00 2022-11-17 2022-12-15 2022-12-24 tions nvelope ementation Miscellaneous IT Equipment PK-LG& CD-315548-GO-DIR / Service Delivery Improveme Under Imple IDA / 69250 Post Direct Selection Direct - National 1,100,000.00 0.00 2022-09-14 2022-11-01 2022-09-19 2022-11-10 2022-10-05 2022-11-19 Procurement of Sucker & Jett nt mentation er Unit PK-LG& CD-331360-GO-RFB / Procurement of Laptops & D Single Stage - One E IDA / 69250 Project Management Post Request for Bids Open - National 210,000.00 0.00 Signed 2022-12-13 2023-01-23 2022-12-16 2023-05-23 2023-01-13 2023-02-20 2023-01-14 2023-03-16 2023-02-05 2023-08-04 esktops for PRMSC Head Offi nvelope ce & Tehsil Offices PK-LG& CD-300945-GO-RFQ Request for Quota Single Stage - One E Under Imple / Office Fixtures & Portable In IBRD / 92670 Project Management Post Open - National 60,000.00 0.00 2022-06-24 2022-06-28 2022-06-30 tions nvelope mentation stallations and Miscellaneous office Items PK-LG& CD-351779-GO-RFQ Request for Quota Single Stage - One E Under Imple / Installation of Monitoring an IDA / 69250 Project Management Post Open - National 60,000.00 0.00 2023-04-06 2023-04-12 2023-05-21 2023-06-20 tions nvelope mentation d Vehicle Tracking System PK-LG& CD-359711-GO-RFB / Installation, Commissioning Water Supply and Sanitation Single Stage - One E Pending Impl and Testing for Solarization o IDA / 69250 Post Request for Bids Open - National 1,000,000.00 0.00 2023-05-10 2023-05-12 2023-06-02 2023-06-07 2023-07-03 2023-10-31 Infrastructure Development nvelope ementation f Water Supply and Sewerag e Schemes under PRSWSSP P hase-I (70 Villages) PK-LG& CD-362800-GO-RFB / Installation, Commissioning Water Supply and Sanitation Single Stage - One E Pending Impl and Testing for Solarization o IDA / 69250 Post Request for Bids Open - National 1,800,000.00 0.00 2023-05-22 2023-05-27 2023-06-17 2023-06-22 2023-07-18 2023-11-15 Infrastructure Development nvelope ementation f Water Supply and Sewerag e Schemes under PRSWSSP P hase-I (70 Villages) Part-II NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LG& CD-332020-NC-DIR / Service Delivery Improveme Under Imple Water & Waste Water Quality IDA / 69250 Prior Direct Selection Direct - National 3,000,000.00 0.00 2023-03-15 2023-02-24 2023-03-20 2023-04-07 2023-04-24 2028-04-22 nt mentation Monitoring PK-LG& CD-289231-NC-RFB / Procurement of the Services Behavior Change and Capaci Single Stage - One E of Implementation Partners f IBRD / 92670 Prior Request for Bids Open - National 3,500,000.00 0.00 Canceled 2022-12-02 2022-12-07 2023-01-18 2023-02-17 2023-03-24 2028-06-30 ty Development nvelope or Behavioral Change Comm unications & Capacity Buildin g (South)/NCS PK-LG& CD-289205-NC-RFB / Procurement of the Services Behavior Change and Capaci Single Stage - One E of Implementation Partners f IBRD / 92670 Prior Request for Bids Open - National 3,500,000.00 0.00 Canceled 2022-12-02 2022-12-07 2023-01-18 2023-02-17 2023-03-24 2023-10-02 ty Development nvelope or Behavioural Change Com munications & Capacity Build ing (Central)/NCS PK-LG& CD-289107-NC-RFB / Procurement of the Services Behavior Change and Capaci Single Stage - One E of Implementation Partners f IBRD / 92670 Prior Request for Bids Open - National 3,500,000.00 0.00 Canceled 2022-12-02 2022-12-07 2023-01-18 2023-02-17 2023-03-24 2028-06-30 ty Development nvelope or Behavioural Change Com munications & Capacity Build ing (North)/NCS PK-LG& CD-316926-NC-RFB / Behavior Change and Capaci Single Stage - One E Under Imple Behavior Change and Capaci IBRD / 92670 Prior Request for Bids Open - National 3,500,000.00 0.00 2022-12-26 2023-02-26 2022-12-31 2023-03-02 2023-02-05 2023-04-07 2023-02-20 2023-05-16 2023-03-20 2025-03-19 ty Development nvelope mentation ty Development Program PK-LG& CD-332746-NC-RFB / Procurement of the Services Behavior Change and Capaci Single Stage - One E Pending Impl of Implementation Partners f IDA / 69250 Prior Request for Bids Open - National 9,000,000.00 0.00 2023-07-20 2023-07-25 2023-09-05 2023-10-05 2023-11-09 2026-11-13 ty Development nvelope ementation or Behavioral Change Comm unications & Capacity Buildin g (Multiple Lots) PK-LG& CD-332015-NC-RFB / Single Stage - One E Impact Evaluation of PRSWSS IDA / 69250 Project Management Post Request for Bids Open - National 1,200,000.00 0.00 Canceled 2023-01-26 2023-01-31 2023-02-28 2023-03-15 2023-04-06 2025-05-25 nvelope P (Baseline and Midline) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 PK-LG& CD-289348-CS-QCBS Water Supply and Sanitation Quality And Cost- Pending Impleme / TPV (TPV (baseline, midline IBRD / 92670 Prior Open - National 1,500,000.00 0.00 2022-09-30 2022-10-21 2022-12-04 2023-01-01 2023-01-31 2023-03-07 2023-04-11 2028-06-30 Infrastructure Development Based Selection ntation and end line)/CS PK-LG& CD-289968-CS-CQS / Water Supply and Sanitation Consultant Qualifi Pilot Services for Engineering IBRD / 92670 Post Open - National 300,000.00 0.00 Signed 2022-04-25 2022-06-27 2022-05-16 2023-05-24 2022-06-06 2022-08-12 2022-06-13 2022-09-23 2022-07-11 2023-04-07 Infrastructure Development cation Selection , Design and Supervision Sou th PK-LG& CD-289097-CS-CQS / Water Supply and Sanitation Consultant Qualifi Pilot Services for Engineering IBRD / 92670 Post Open - National 300,000.00 0.00 Signed 2022-04-26 2022-06-27 2022-05-17 2023-05-23 2022-06-07 2022-08-01 2022-07-07 2022-10-24 2022-08-11 2023-05-08 Infrastructure Development cation Selection , Design and Supervision Cen tral /CS PK-LG& CD-289966-CS-CQS / Water Supply and Sanitation Consultant Qualifi Pilot Services for Engineering IBRD / 92670 Post Open - National 300,000.00 0.00 Signed 2022-04-18 2022-06-27 2022-05-09 2023-05-23 2022-05-30 2022-08-12 2022-06-29 2022-09-23 2022-08-03 2023-04-30 Infrastructure Development cation Selection , Design and Supervision Nor th/CS PK-LG& CD-292584-CS-CQS / Water Supply and Sanitation Consultant Qualifi Pilot Services for Engineering IBRD / 92670 Post Open - National 300,000.00 0.00 Signed 2022-05-10 2022-06-27 2022-05-31 2023-05-23 2022-06-21 2022-08-12 2022-07-21 2022-09-23 2022-08-11 2023-05-08 Infrastructure Development cation Selection , Design and Supervision Nor th- A/CS PK-LG& CD-292585-CS-CQS / Water Supply and Sanitation Consultant Qualifi Pilot Services for Engineering IBRD / 92670 Post Open - National 300,000.00 0.00 Signed 2022-05-11 2022-06-27 2022-06-01 2023-05-23 2022-06-22 2022-08-12 2022-07-22 2022-09-23 2022-08-12 2023-05-09 Infrastructure Development cation Selection , Design and Supervision Cen tral - A /CS PK-LG& CD-292587-CS-CQS / Water Supply and Sanitation Consultant Qualifi Pilot Services for Engineering IBRD / 92670 Post Open - National 300,000.00 0.00 Signed 2022-05-12 2022-06-27 2022-06-02 2023-05-23 2022-06-23 2022-08-01 2022-07-23 2022-09-23 2022-08-13 2023-05-10 Infrastructure Development cation Selection , Design and Supervision Sou th-A /CS PK-LG& CD-289349-CS-QCBS Quality And Cost- IBRD / 92670 Project Management Prior Open - National 1,000,000.00 0.00 Canceled 2022-07-05 2022-07-26 2022-09-08 2022-10-06 2022-11-05 2022-12-10 2023-01-14 2028-06-30 / Internal Audit Firm/CS Based Selection PK-LG& CD-289099-CS-CQS / Procurement of Services for Water Supply and Sanitation Consultant Qualifi IBRD / 92670 Post Open - National 300,000.00 0.00 Canceled 2022-05-06 2022-05-27 2022-06-17 2022-06-24 2022-07-08 2023-01-04 Development of Punjab BCC Infrastructure Development cation Selection WASH Strategy PK-LG& CD-333387-CS-QCBS Quality And Cost- IDA / 69250 Project Management Post Open - National 400,000.00 0.00 Canceled 2026-03-12 2026-04-02 2026-05-16 2026-06-13 2026-07-13 2026-08-17 2026-09-21 2027-09-21 / Impact Evaluation Firm/ End Based Selection line PK-LG& CD-334176-CS-CQS / Water Supply and Sanitation Consultant Qualifi Procurement for hiring of Fir IDA / 69250 Post Open - National 250,000.00 0.00 Signed 2023-01-04 2023-01-09 2023-01-19 2023-02-27 2023-02-02 2023-03-30 2023-02-09 2023-04-12 2023-02-23 2024-02-23 Infrastructure Development cation Selection m for Tariff Appraisal Study f or PRSWSSP PK-LG& CD-346557-CS-CQS / Consultant Qualifi Consultancy Services for Co IDA / 69250 Project Management Post Open - National 100,000.00 0.00 Under Review 2023-03-07 2023-06-22 2023-03-28 2023-04-11 2023-05-11 2023-05-25 2024-05-24 cation Selection mmunication/PR/Marketing of PRSWSSP PK-LG& CD-289246-CS-QCBS Water Supply and Sanitation Quality And Cost- Under Implement / Services for Engineering, D IBRD / 92670 Prior Open - National 3,500,000.00 0.00 2023-04-14 2023-05-16 2023-05-05 2023-06-17 2023-05-27 2023-06-24 2023-07-09 2023-07-31 2023-08-22 2028-08-25 Infrastructure Development Based Selection ation esign and Supervision North / CS PK-LG& CD-289251-CS-QCBS Water Supply and Sanitation Quality And Cost- Under Implement / Services for Engineering, D IBRD / 92670 Prior Open - National 3,750,000.00 0.00 2023-04-14 2023-05-16 2023-05-05 2023-06-17 2023-05-27 2023-06-24 2023-07-09 2023-07-31 2023-08-22 2028-08-23 Infrastructure Development Based Selection ation esign and Supervision Centra l /CS PK-LG& CD-289253-CS-QCBS Water Supply and Sanitation Quality And Cost- Under Implement / Services for Engineering, D IBRD / 92670 Prior Open - National 3,000,000.00 0.00 2023-04-14 2023-05-16 2023-05-05 2023-06-17 2023-05-27 2023-06-24 2023-07-09 2023-07-31 2023-08-22 2028-08-21 Infrastructure Development Based Selection ation esign and Supervision South- I /CS PK-LG& CD-353899-CS-QCBS Water Supply and Sanitation Quality And Cost- Under Implement / Services for Engineering, D IBRD / 92670 Prior Open - National 3,500,000.00 0.00 2023-04-14 2023-05-16 2023-05-05 2023-06-17 2023-05-27 2023-06-24 2023-07-09 2023-07-31 2023-08-22 2028-08-25 Infrastructure Development Based Selection ation esign and Supervision South- II /CS PK-LG& CD-353901-CS-QCBS Water Supply and Sanitation Quality And Cost- Under Implement / Services for Engineering, D IBRD / 92670 Prior Open - National 3,500,000.00 0.00 2023-04-14 2023-05-16 2023-05-05 2023-06-17 2023-05-27 2023-06-24 2023-07-09 2023-07-31 2023-08-22 2028-08-25 Infrastructure Development Based Selection ation esign and Supervision South- III /CS PK-LG& CD-359704-CS-LCS / Least Cost Selecti Consultancy Services for Imp IDA / 69250 Project Management Prior Open - National 3,600,000.00 0.00 Canceled 2023-05-10 2023-05-19 2023-05-31 2023-05-26 2023-06-17 2023-07-15 2023-07-22 2023-08-03 2023-08-31 2028-01-17 on act Evaluation of PRSWSSP PK-LG& CD-364852-CS-QCBS Quality And Cost- Under Implement IDA / 69250 Project Management Prior Open - National 3,600,000.00 0.00 2023-06-06 2023-06-09 2023-06-27 2023-06-24 2023-07-14 2023-08-11 2023-08-21 2023-09-05 2023-09-29 2028-02-15 / Impact Evaluation of PRSWS Based Selection ation SP INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-LG& CD-316922-CS-INDV Individual Consult IDA / 69250 Project Management Post Open - National 30,000.00 0.00 Under Review 2022-09-26 2022-09-15 2022-10-22 2022-10-29 2022-11-08 2023-11-08 / MIS System Architect ant Selection PK-LG& CD-316924-CS-INDV Individual Consult IDA / 69250 Project Management Post Open - National 25,000.00 0.00 Under Review 2022-09-27 2022-09-15 2022-10-23 2022-10-28 2022-11-07 2023-11-07 / Principal Technology Adviso ant Selection r (ERP) PK-LG& CD-289361-CS-INDV Individual Consult IBRD / 92670 Project Management Post Open 250,000.00 0.00 Canceled 2022-05-03 2022-06-07 2022-06-14 2022-06-21 2028-06-30 / Safeguard Specialist /IC ant Selection PK-LG& CD-289357-CS-INDV / Procurement Specialist /IC/ Individual Consult IBRD / 92670 Project Management Post Open 250,000.00 0.00 Canceled 2022-04-30 2022-06-04 2022-06-11 2022-06-18 2028-06-30 Sr. Procurement & Contract S ant Selection pecialist PK-LG& CD-325078-CS-INDV Individual Consult / Individual Consultant for Ba IDA / 69250 Project Management Post Open - National 20,000.00 0.00 Canceled 2022-11-16 2022-11-30 2022-12-28 2023-01-05 2023-07-04 ant Selection seline, Midline and Endline S urvey PK-LG& CD-289359-CS-INDV Individual Consult IBRD / 92670 Project Management Post Open 250,000.00 0.00 Canceled 2022-07-07 2022-08-11 2022-08-18 2022-08-25 2028-06-30 / M& E Specialist/IC ant Selection PK-LG& CD-289356-CS-INDV Individual Consult IBRD / 92670 Project Management Prior Open 300,000.00 0.00 Canceled 2022-04-30 2022-06-04 2022-06-11 2022-06-18 2028-06-30 / Project Coordinator /IC ant Selection PK-LG& CD-289360-CS-INDV Individual Consult IBRD / 92670 Project Management Post Open 250,000.00 0.00 Canceled 2022-05-10 2022-06-14 2022-06-21 2022-06-28 2028-06-30 / Environmental specialist/IC ant Selection Page 4 PK-LG& CD-289358-CS-INDV Individual Consult IBRD / 92670 Project Management Post Open 250,000.00 0.00 Canceled 2022-05-03 2022-06-07 2022-06-14 2022-06-21 2028-06-30 / Financial Management Spec ant Selection ialist /IC PK-LG& CD-332736-CS-INDV Individual Consult IDA / 69250 Project Management Post Limited 13,000.00 0.00 Signed 2022-12-23 2023-04-03 2022-12-24 2023-03-20 2022-12-26 2023-04-10 2023-01-14 2023-04-14 / Procurement Specialist ant Selection PK-LG& CD-332737-CS-INDV Individual Consult Pending Impleme IDA / 69250 Project Management Post Limited 12,000.00 0.00 2022-12-23 2022-12-25 2022-12-28 2023-01-07 2023-04-07 / Contract Management Spec ant Selection ntation ialist PK-LG& CD-332740-CS-INDV Individual Consult IDA / 69250 Project Management Post Limited 20,000.00 0.00 Signed 2022-12-25 2023-03-27 2022-12-27 2023-03-01 2023-01-17 2023-03-31 2023-02-21 2023-08-20 / Legal Expert ant Selection PK-LG& CD-362799-CS-INDV Water Supply and Sanitation Individual Consult Under Implement / Engineering Design Review IDA / 69250 Post Limited 10,000.00 0.00 2023-05-22 2023-06-20 2023-05-25 2023-05-30 2023-06-09 2023-10-07 Infrastructure Development ant Selection ation Consultant for 200 Villages Page 5 The textual part of this Procurement Plan is not available as an abbreviated Procurement Plan was used (as this is a Project Preparation Advance for the preparation of a lending project). PROCUREMENT Western and Central Africa : Community-Based Recovery and Stabilization Project for the Sahel PLAN General Information Country: Western and Central Africa 2022-10-07 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173830 GPN Date: 2022-03-28 Project Name: Community-Based Recovery and Stabilization Project for the Sahel Loan / Credit No: IDA / D8310 Reconstruction and Economic Recovery Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Quota ML-PRRE-361972-CW-RFQ / Component 2: Transitional s Request for Quota Single Stage - One E tions - Small Work Pending Imp 2023-11-0 Réhabilitation des hangars a IDA / D8310 upport towards stabilization Post Open - National 60,000.00 0.00 2023-05-31 2023-07-09 tions nvelope s (Emergency) SP lementation 6 u niveau du port de pêche de and territorial development D -Competitive Konna of communities Request for Quota ML-PRRE-361963-CW-RFQ / Component 2: Transitional s Request for Quota Single Stage - One E tions - Small Work Pending Imp 2023-11-1 Réalisation de l'AEP de TONK IDA / D8310 upport towards stabilization Post Open - National 480,000.00 0.00 2023-06-01 2023-07-15 tions nvelope s (Emergency) SP lementation 2 A and territorial development D -Competitive of communities Request for Quota ML-PRRE-361971-CW-RFQ / Component 2: Transitional s Request for Quota Single Stage - One E tions - Small Work Pending Imp 2023-11-1 Réalisations Caniveaux et Col IDA / D8310 upport towards stabilization Post Open - National 600,000.00 0.00 2023-06-01 2023-07-16 tions nvelope s (Emergency) SP lementation 3 lecteurs de la ville de Douent and territorial development D -Competitive za of communities GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRRE-317681-GO-RFB / A Component 4: Project Manag Single Stage - One E Pending Impl IDA / D8310 Post Request for Bids Open - National 300,000.00 0.00 2022-11-01 2022-11-06 2022-12-04 2022-12-18 2023-01-22 2023-05-22 cquisition de Matériels roulan ement nvelope ementation t ML-PRRE-317683-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition de matériels infor IDA / D8310 Post Open - National 49,000.00 0.00 2022-11-16 2023-01-11 2023-04-11 ement tions nvelope ementation matique pour l'unité de Coor dination du Projet ML-PRRE-317688-GO-RFQ / Acquisition de matériels et m Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl IDA / D8310 Post Open - National 60,000.00 0.00 2022-11-16 2023-01-11 2023-04-11 obiliers de bureau de la Coor ement tions nvelope ementation dination du Projet ML-PRRE-317695-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl IDA / D8310 Post Open - National 20,000.00 0.00 2022-10-15 2022-12-10 2023-02-08 Acquisition du logiciel Tom pr ement tions nvelope ementation o ML-PRRE-317895-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition de Matériels infor IDA / D8310 Post Open - National 25,000.00 0.00 2022-10-30 2022-12-18 2023-02-16 ement tions nvelope ementation matiques pour l'antenne de Mopti ML-PRRE-317896-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition de Matériels infor IDA / D8310 Post Open - National 25,000.00 0.00 2022-11-06 2023-01-01 2023-01-04 ement tions nvelope ementation matiques pour l'antenne de Gao ML-PRRE-317899-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition de Matériels infor IDA / D8310 Post Open - National 25,000.00 0.00 2022-11-06 2023-01-01 2023-01-31 ement tions nvelope ementation matiques pour l'antenne de Douentza ML-PRRE-317900-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition de Matériels infor IDA / D8310 Post Open - National 25,000.00 0.00 2022-11-06 2023-01-01 2023-01-31 ement tions nvelope ementation matiques pour l'antenne de T ombouctou ML-PRRE-317901-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition de Matériels infor IDA / D8310 Post Open - National 25,000.00 0.00 2022-11-06 2023-01-01 2023-01-31 ement tions nvelope ementation matiques pour l'antenne de Menaka ML-PRRE-317913-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition matériels et mobi IDA / D8310 Post Open - National 20,000.00 0.00 2022-10-22 2022-12-17 2023-01-16 ement tions nvelope ementation liers de bureau antenne de Mopti ML-PRRE-317914-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition matériels et mobi IDA / D8310 Post Open - National 20,000.00 0.00 2022-11-22 2023-01-26 2023-07-25 ement tions nvelope ementation liers de bureau antenne de Gao ML-PRRE-317915-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition matériels et mobi IDA / D8310 Post Open - National 20,000.00 0.00 2022-11-15 2023-01-03 2023-02-02 ement tions nvelope ementation liers de bureau antenne de Douentza ML-PRRE-317916-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition matériels et mobi IDA / D8310 Post Open - National 20,000.00 0.00 2022-11-06 2022-12-18 2023-01-17 ement tions nvelope ementation liers de bureau antenne de T ombouctou ML-PRRE-317917-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Acquisition matériels et mobi IDA / D8310 Post Open - National 20,000.00 0.00 2022-10-26 2022-12-21 2023-01-20 ement tions nvelope ementation liers de bureau antenne de Ménaka ML-PRRE-323259-NC-DIR / L Component 4: Project Manag Under Imple IDA / D8310 Post Direct Selection Direct - National 56,640.00 0.00 2022-11-02 2022-09-01 2022-11-07 2022-08-09 2022-12-12 2023-06-10 ocation siege du Projet pcrss ement mentation ML-PRRE-344356-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl IDA / D8310 Post Open - National 30,000.00 0.00 2023-03-11 2023-05-06 2023-11-02 Dotation Matériels FULL STA ement tions nvelope ementation CK ML-PRRE-344360-GO-RFQ / F Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl IDA / D8310 Post Open - National 20,000.00 0.00 2023-03-11 2023-04-15 2023-10-12 ourniture de bureau du Projet ement tions nvelope ementation ML-PRRE-344363-GO-RFQ / Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl Dépliants et chemises person IDA / D8310 Post Open - National 12,000.00 0.00 2023-03-08 2023-04-17 2023-10-14 ement tions nvelope ementation nalisées PCRSS NON CONSULTING SERVICES Page 1 Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRRE-317887-NC-DIR / A Component 4: Project Manag Pending Impl cquisition d’un logiciel de ges IDA / D8310 Post Direct Selection Direct - National 35,000.00 0.00 2022-09-30 2022-10-05 2022-11-02 2022-12-02 ement ementation tion des marchés module DG MP SIGMAP ML-PRRE-317892-NC-RFQ / A Component 4: Project Manag Request for Quota Single Stage - One E Pending Impl IDA / D8310 Post Open - National 15,000.00 0.00 2022-10-25 2022-12-20 2023-01-19 cquisition et installation su SI ement tions nvelope ementation T WEB ML-PRRE-324121-NC-DIR / A cquisition d’un logiciel de ges Component 4: Project Manag Under Imple IDA / D8310 Post Direct Selection Direct - National 110,500.00 0.00 2022-11-07 2022-11-08 2022-11-12 2022-11-29 2022-12-10 2023-06-08 tion financière pour le projet ement mentation multi site multi projets assist ance et formation CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRRE-311862-CS-QCBS / Component 4: Project Manag Quality And Cost- Under Implement Audit financier et comptable IDA / D8310 Post Open - National 48,000.00 0.00 2022-08-24 2022-10-10 2022-08-31 2022-10-29 2022-09-21 2022-11-22 2022-10-19 2023-01-25 2022-10-29 2022-11-26 2022-12-20 2023-12-20 ement Based Selection ation exercices 2022 2023 2024 ML-PRRE-323261-CS-QCBS / Component 2: Transitional s Quality And Cost- Under Implement Convention maitrise d'ouvrag IDA / D8310 upport towards stabilization Post Open - National 827,848.00 0.00 2022-11-03 2022-11-03 2022-11-17 2022-11-25 2022-12-15 2023-03-15 2023-01-12 2023-01-26 2023-02-10 2023-03-17 2026-12-11 Based Selection ation e délégué Zone 2 and territorial development of communities ML-PRRE-323264-CS-CQS / R Component 2: Transitional s ecrutement d'un consultant p upport towards stabilization Consultant Qualifi Pending Impleme IDA / D8310 Post Open - National 22,000.00 0.00 2022-11-14 2022-11-28 2022-12-26 2023-01-05 2023-01-26 2023-03-27 our la mise en place de la ba and territorial development cation Selection ntation se de données du PCRSS of communities ML-PRRE-324120-CS-CQS / R ecrutement d’un consultant pour l’élaboration d’un catalo Component 3: Regional dialo Consultant Qualifi Pending Impleme gue de recherches et d’un ag IDA / D8310 gue, coordination and data a Post Open - National 55,000.00 0.00 2022-11-10 2022-11-14 2022-12-05 2022-12-15 2023-01-05 2023-07-04 cation Selection ntation enda de recherche dans le ca nd capacity building dre de la mise en place d’une plateforme de données du PC RSS ML-PRRE-323263-CS-QCBS / Component 2: Transitional s Quality And Cost- Under Implement Convention maitrise d'ouvrag IDA / D8310 upport towards stabilization Post Open - National 1,009,000.00 0.00 2022-11-07 2022-11-03 2022-11-21 2022-11-25 2022-12-19 2023-03-15 2023-01-16 2023-01-30 2023-02-27 2023-04-03 2026-12-28 Based Selection ation e delegué recrutement ONG and territorial development ZONE 4 of communities ML-PRRE-323262-CS-QCBS / Component 2: Transitional s Quality And Cost- Under Implement Convention maitrise d'ouvrag IDA / D8310 upport towards stabilization Post Open - National 1,671,000.00 0.00 2022-11-07 2022-11-03 2022-11-21 2022-11-25 2022-12-19 2023-03-15 2023-01-16 2023-01-30 2023-03-06 2023-04-03 2026-12-28 Based Selection ation e délègue recrutement ONG and territorial development zone 3 of communities ML-PRRE-332451-CS-CQS / r ecrutement de l’ONG ou du g Component 4: Project Manag Consultant Qualifi Under Implement roupement d’ONG pour l’eng IDA / D8310 Post Open - National 275,000.00 0.00 2022-12-21 2022-12-21 2022-12-25 2023-01-15 2023-01-22 2023-02-05 2025-01-25 ement cation Selection ation agement communautaire de la zone 1 du projet ( Mopti Dj enne et Tenenkou ML-PRRE-332452-CS-CQS / r ecrutement d' une ONG pour la supervision de la distributi Component 4: Project Manag Consultant Qualifi Pending Impleme IDA / D8310 Post Open - National 90,000.00 0.00 2022-12-27 2023-01-01 2023-01-22 2023-01-29 2023-02-12 2024-02-07 on (1A et 1B) dans les cercle ement cation Selection ntation s de Mopti, Djenne ,Tenenko u ,Youwarou, Douentza et Go urma rharous ML-PRRE-332453-CS-CQS / r ecrutement d'une ONG pour Component 4: Project Manag Consultant Qualifi Pending Impleme la supervision de la distributi IDA / D8310 Post Open - National 85,000.00 0.00 2022-12-28 2023-01-01 2023-01-22 2023-02-01 2023-02-15 2024-02-10 ement cation Selection ntation on (1A et 1B) dans les cercle s de Gao, Ansongo, Bourem e t Ménaka ML-PRRE-332454-CS-CQS / r ecrutement d'une ONG pour Component 4: Project Manag Consultant Qualifi Pending Impleme la supervision de la distributi IDA / D8310 Post Open - National 85,000.00 0.00 2022-12-28 2023-01-01 2023-01-22 2023-02-01 2023-02-15 2024-02-10 ement cation Selection ntation on (1A et 1B) dans les cercle s de Bandiagara, Bankass et Koro ML-PRRE-344348-CS-CQS / R ecrutement d’un Consultant Component 4: Project Manag Consultant Qualifi chargé de la mise enoeuvre IDA / D8310 Post Open - National 111,000.00 0.00 Under Review 2023-02-27 2023-04-28 2023-03-09 2023-03-29 2023-03-31 2023-05-05 2023-11-01 ement cation Selection des mesures relatives à la vi olence basée sur le Genre (V BG) ML-PRRE-344341-CS-QCBS / Component 4: Project Manag Quality And Cost- SUPERVISION PAR TIERCE PA IDA / D8310 Post Open - National 960,000.00 0.00 Under Review 2023-05-29 2023-06-11 2023-06-01 2023-07-06 2023-08-03 2023-08-13 2023-09-10 2023-10-15 2024-10-14 ement Based Selection RTIE DES ACTIVITES DU PROJ ET INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-PRRE-317647-CS-CDS / C Component 2: Transitional s Under Implement onvention Maitrise d'Ouvrage IDA / D8310 upport towards stabilization Post Direct Selection Direct - National 1,480,000.00 0.00 2022-09-30 2022-10-21 2022-10-06 2022-10-25 2022-11-20 2026-11-27 ation Délégué avec SOS SAHEL and territorial development of communities ML-PRRE-317674-CS-CDS / C Component 1: Resilient and i onvention Maitrise d'Ouvrage IDA / D8310 nclusive recovery of conflict- Post Direct Selection Direct - National 1,460,000.00 0.00 Signed 2022-10-03 2022-10-10 2022-10-09 2022-10-25 2022-12-06 2023-06-04 déléguée AGETIPE affected communities ML-PRRE-317680-CS-CDS / C Component 1: Resilient and i onvention Maitrise d'Ouvrage IDA / D8310 nclusive recovery of conflict- Post Direct Selection Direct - National 1,040,000.00 0.00 Signed 2022-09-30 2022-10-10 2022-10-07 2022-10-25 2022-12-11 2026-11-27 Déléguée AGETIER affected communities ML-PRRE-361979-CS-CDS / E Component 2: Transitional s tudes d’actualisation et le co upport towards stabilization Under Implement IDA / D8310 Post Direct Selection Direct - National 48,000.00 0.00 2023-05-23 2023-05-23 2023-05-25 2023-06-15 2023-07-15 ntrôle des travaux de réalisat and territorial development ation ion de l'AEP de TONKA. of communities Page 2 ML-PRRE-361986-CS-CDS / E Component 2: Transitional s études d’actualisation et le c upport towards stabilization Under Implement ontrôle des travaux de réalis IDA / D8310 Post Direct Selection Direct - National 40,000.00 0.00 2023-05-22 2023-05-23 2023-05-24 2023-06-15 2023-07-15 and territorial development ation ation des caniveaux et collec of communities teurs de la ville de Douentza ML-PRRE-361989-CS-CDS / é Component 2: Transitional s tudes d’actualisation et le co upport towards stabilization Under Implement ntrôle des travaux de Réhabil IDA / D8310 Post Direct Selection Direct - National 10,000.00 0.00 2023-05-24 2023-05-23 2023-05-26 2023-06-19 2023-07-19 and territorial development ation itation des hangars au nivea of communities u du port de pêche de Konna Page 3 PROCUREMENT PLAN (Textual Part) Project information: Brazil: Integrated Landscape Management in the Cerrado Biome Project – P164602 Project Implementation agency: DEUTSCHE GESELLSCHAFT FÜR INTERNATIONALE ZUSAMMENARBEIT GmbH (GIZ) Date of the Procurement Plan: August 21, 2018 Period covered by this Procurement Plan: October 2018- March 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Brazil : Integrated Landscape Management in the Cerrado Biome Project PLAN General Information Country: Brazil 2018-09-03 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank2023-05-22 if none) Project ID: P164602 GPN Date: Project Name: Integrated Landscape Management in the Cerrado Biome Project Loan / Credit No: / , TF / A8532 German Society for International Cooperation Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process S Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Comple Description Component Review Type Method nt Docume ount (US$ and Recommendatio Signed Contract o. h cess (Y/N) sk tatus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes tion nt Type ) n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EMBRAPA 2 BR-GIZ-76279- CW-APA / Contratação de e Mainstreaning Landscape Pr Alternative Procur Single Stage - One 2019-05-2 mpresa da área de construç / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-01 2018-10-06 2018-10-27 2018-11-03 2018-11-24 Envelope 3 ão civil para execução de ref sheds ent orma do auditório e salas de aula da EMBRAPA Cerrados. EMBRAPA 2 BR-GIZ-76268- CW-APA / Contratação de e mpresa da área de construç Mainstreaning Landscape Pr Alternative Procur Single Stage - One 2019-05-2 ão civil para reforma e adeq / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-01 2018-10-06 2018-10-27 2018-11-03 2018-11-24 Envelope 3 uação do Viveiro de P&D da sheds ent Embrapa Cerrados para ope rar também como Unidade de Aprendizagem EMBRAPA 2 BR-GIZ-76209- CW-APA / Contratação de e mpresa da área de construç Mainstreaning Landscape Pr Alternative Procur Single Stage - One 2019-05-2 ão civil para reforma e adeq / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-01 2018-10-06 2018-10-27 2018-11-03 2018-11-24 Envelope 3 uação e manutenção do Stu sheds ent dio para produção/gravação de vídeos para TT, inclusive EAD, da Embrapa Cerrados EMBRAPA BR-GIZ-242453-C W-RFQ / Contratação de em Institutional Development a Other (with f Request for Quot Single Stage - One 2022-06-0 presa da área de construção TF / A8532 nd Capacity Building for Lan Post Open - National ield for expla 0.00 Canceled 2021-10-09 2021-12-04 ations Envelope 2 civil para reforma e adequaç dscape Management nation) ão do Viveiro de Mudas da E mbrapa Cerrados. EMBRAPA BR-GIZ-161546-C W-RFQ / Contratação de em Institutional Development a Other (with f Request for Quot Single Stage - One Under Impl 2023-07-2 presa para obra de reforma TF / A8532 nd Capacity Building for Lan Post Open - National ield for expla 0.00 2022-12-05 2023-01-30 ations Envelope ementation 9 de construção civil de auditó dscape Management nation) rio para capacitação na Emb rapa Cerrados.... GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendatio Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EMBRAPA 1 BR-GIZ-76233- GO-APA / Aquisição de equip amentos de informatica com Institutional Development a Alternative Procur Single Stage - One putadores etc.. Para a equip / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-10 2018-10-15 2018-11-05 2018-11-12 2018-12-03 2019-06-01 Envelope e de processamento e siste dscape Management ent matização da informação te cnológica da paisagem da E mbrapa Cerrados. EMBRAPA 2 BR-GIZ-76255- GO-APA / Aquisição de equip Mainstreaning Landscape Pr Alternative Procur Single Stage - One amentos de informatica com / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-10 2018-10-15 2018-11-05 2018-11-12 2018-12-03 2019-06-01 Envelope putadores, etc.. para a sala sheds ent de treinamento (EAD) da Em brapa Cerrados. EMBRAPA 1 BR-GIZ-76272- GO-APA / Aquisição de maqu inas e equipamentos tecnico Institutional Development a Alternative Procur Single Stage - One s para analises de campo pa / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-10 2018-10-15 2018-11-05 2018-11-12 2018-12-03 2019-06-01 Envelope ra avaliar o processamento dscape Management ent e sistematização da informa ção tecnológica da paisage m da Embrapa Cerrados. EMBRAPA 2 BR-GIZ-76207- Mainstreaning Landscape Pr Alternative Procur GO-APA / Aquisição de mobil Single Stage - One / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-10 2018-10-15 2018-11-05 2018-11-12 2018-12-03 2019-06-01 iário para auditorio e sala de Envelope sheds ent treinamento (EAD) da Embr apa Cerrados. EMBRAPA 2 BR-GIZ-76257- GO-APA / Aquisição de mate Mainstreaning Landscape Pr Alternative Procur Single Stage - One rial didatico impresso para d / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2019-03-10 2019-03-15 2019-04-05 2019-04-12 2019-05-03 2019-10-30 Envelope istribuição nos cursos de co sheds ent nservação para os diferente s atores/públicos. EMBRAPA 1 BR-GIZ-76283- GO-APA / Aquisição de equip Institutional Development a Alternative Procur Single Stage - One amentos eletroeletronicos p / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 Envelope ara o auditorio e as salas de dscape Management ent treinamento da Embrapa C errados. EMBRAPA 2 BR-GIZ-76256- GO-APA / Aquisição de mate Mainstreaning Landscape Pr Alternative Procur rial (toner, tinta, papel etc..) Single Stage - One / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-01 2018-10-06 2018-10-27 2018-11-03 2018-11-24 2019-05-23 para impressao de material Envelope sheds ent didatico (audiovisual) para o s cursos de conservação par a os diferentes atores/públic os. EMBRAPA 1 BR-GIZ-76250- GO-APA / Aquisição de equip Institutional Development a Alternative Procur Single Stage - One amentos de audio visual etc / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2019-02-10 2019-02-15 2019-03-08 2019-03-15 2019-04-05 2019-10-02 Envelope .. para auditorio e sala de tr dscape Management ent einamento (EAD) da Embrap a Cerrados. EMBRAPA 1 BR-GIZ-76258- GO-APA / Aquisição de mate rial de consumo para estudo Institutional Development a Alternative Procur s prospectivos de cenários d Single Stage - One / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 e conservação e produção c Envelope dscape Management ent om tecnologias disponíveis s obre o CAR, PRA, tecnologia s do ABC, BPAs, RAD, Legisl ação de Proteção da Vegeta ção Nativa EMBRAPA 2 BR-GIZ-76291- GO-APA / Aquisição de mate rial de consumo para a reali zação do componente de co Mainstreaning Landscape Pr Alternative Procur Single Stage - One nservação da paisagem nos / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 Envelope cursos, treinamentos, dias d sheds ent e campo etc.sobre o CAR, P RA, tecnologias do ABC, BPA s, RAD, Legislação de Proteç ão da Vegetação Nativa Page 1 EMBRAPA 1 BR-GIZ-76269- GO-APA / Aquisição de comb ustível para a realização do s estudos prospectivos de c Institutional Development a Alternative Procur Single Stage - One enários e paisagens de cons / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 Envelope ervação e produção com te dscape Management ent cnologias disponíveis sobre o CAR, PRA, tecnologias do ABC, BPAs, RAD, Legislação de Proteção da Vegetação N ativa EMBRAPA 2 BR-GIZ-76208- GO-APA / Aquisição de comb ustível para a realização do Mainstreaning Landscape Pr Alternative Procur s cursos e estudos de conse Single Stage - One / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 rvação da paisagem nos cur Envelope sheds ent sos, treinamentos, dias de c ampo etc.sobre o CAR, PRA, tecnologias do ABC, BPAs, R AD, Legislação de Proteção da Vegetação Nativa SFB 2 BR-GIZ-76245-GO-AP Mainstreaning Landscape Pr Alternative Procur Single Stage - One A / Aquisicao de Kits promoc / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2019-03-15 2019-03-20 2019-04-10 2019-04-17 2019-05-08 2019-11-04 Envelope ionais de comunicacao e inf sheds ent ormativos INPE 1 BR-GIZ-76271-GO-A Institutional Development a Alternative Procur PA / Aquisição de material d Single Stage - One / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 e Campo (mapeamento orbi Envelope dscape Management ent tal e análise da paisagem) INPE 1 BR-GIZ-76287-GO-A Institutional Development a Alternative Procur PA / Aquisição de Material d Single Stage - One / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 e Escritório (mapeamento or Envelope dscape Management ent bital e análise da paisagem) INPE 1 BR-GIZ-76192-GO-A Institutional Development a Alternative Procur PA / Aquisição de equipame Single Stage - One / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 ntos de Informática (mapea Envelope dscape Management ent mento orbital e análise da p aisagem) INPE 1 BR-GIZ-76218-GO-A Institutional Development a Alternative Procur Single Stage - One PA / Aquisição de equipame / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 Envelope nto Fotográfico (mapeament dscape Management ent o orbital) GIZ 3 BR-GIZ-76225-GO-AP Project Management, Monit Alternative Procur Single Stage - One A / Aquisição de equipament / oring, Evaluation and Com Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 Envelope os de informática para equip munication ent e base da GIZ INPE BR-GIZ-109966-GO-RF Institutional Development a Q / Aquisição de equipamen Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 9,464.01 Signed 2019-06-08 2019-08-03 2019-07-09 2020-01-30 tos de Informática (mapeam ations Envelope dscape Management ento orbital e análise da pai sagem) INPE BR-GIZ-109967-GO-RF Institutional Development a Request for Quot Single Stage - One Q / Aquisição de equipamen TF / A8532 nd Capacity Building for Lan Post Open - National 3,003.44 Signed 2019-08-10 2019-10-05 2019-08-28 2020-04-02 ations Envelope to Fotográfico (mapeamento dscape Management orbital) GIZ BR-GIZ-109985-GO-RFQ Project Management, Monit Request for Quot Single Stage - One / Aquisição de equipamento TF / A8532 oring, Evaluation and Com Post Open - National 0.00 Canceled 2019-04-15 2019-06-10 2019-12-07 ations Envelope s de informática para equipe munication base da GIZ EMBRAPA BR-GIZ-123501-G O-RFQ / Adquirir equipamen Institutional Development a tos para edicao de videos pa Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 8,053.30 Signed 2019-08-06 2019-10-01 2019-11-12 2020-03-29 ra a Embrapa/Cerrados que ations Envelope dscape Management atenderao demandas do trei namento dos tecnicos do SE NAR GIZ-BR-GIZ-143344-GO-RFQ Project Management, Monit Request for Quot Single Stage - One / Aquisicao de uma licenca d TF / A8532 oring, Evaluation and Com Post Open - National 369.85 Signed 2019-11-16 2020-01-11 2019-11-27 2020-07-09 ations Envelope e software para gerenciame munication nto de projeto INPE BR-GIZ-161547-GO-RF Institutional Development a Request for Quot Single Stage - One Q / Equipamentos de escritó TF / A8532 nd Capacity Building for Lan Post Open - National 592.74 Signed 2020-04-06 2020-06-01 2020-04-14 2020-11-28 ations Envelope rio (ar-condicionado, cadeira dscape Management s, etc.) INPE BR-GIZ-162147-GO-RF Institutional Development a Request for Quot Single Stage - One Q / Equipamentos de inform TF / A8532 nd Capacity Building for Lan Post Open - National 1,915.01 Terminated 2020-07-10 2020-09-04 2020-03-20 2021-03-03 ations Envelope ática dscape Management EMBRAPA BR-GIZ-109842-G O-RFQ / Aquisição de combu stível para a realização dos estudos prospectivos de cen Institutional Development a Request for Quot Single Stage - One ários e paisagens de conser TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2019-07-13 2019-09-07 2020-03-05 ations Envelope vação e produção com tecn dscape Management ologias disponíveis sobre o CAR, PRA, tecnologias do AB C, BPAs, RAD, Legislação de Proteção da Vegetação Nati va. INPE BR-GIZ-109958-GO-AP Institutional Development a A / Aquisição de Material de Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2019-09-07 2019-11-02 2020-04-30 Escritório (mapeamento orbi ations Envelope dscape Management tal e análise da paisagem) INPE BR-GIZ-109957-GO-RF Institutional Development a Q / Aquisição de material de Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2019-09-07 2019-11-02 2020-04-30 Campo (mapeamento orbital ations Envelope dscape Management e análise da paisagem) INPE BR-GIZ-201636-GO-RF Institutional Development a Request for Quot Single Stage - One Q / Aquisição de equipamen TF / A8532 nd Capacity Building for Lan Post Open - National 8,018.21 Completed 2020-11-03 2020-12-29 2021-01-28 2021-06-27 2021-01-29 ations Envelope tos de informática dscape Management EMBRAPA BR-GIZ-240326-G O-RFQ / Aquisição de Softwa re Adobe EDU Named Acrob Institutional Development a Request for Quot Single Stage - One at Pro DC for Teams - Multipl TF / A8532 nd Capacity Building for Lan Post Open - National 542.67 Completed 2021-07-03 2021-08-28 2021-07-13 2022-02-24 2021-08-12 ations Envelope ataforma ML para a Embrap dscape Management a Cerrados, parceira do Proj eto Paisagens Rurais (FIP-Pa isagens) INPE BR-GIZ-240327-GO-RF Q / Aquisição de HDs extern Institutional Development a Request for Quot Single Stage - One os portáteis para a Embrapa TF / A8532 nd Capacity Building for Lan Post Open - National 848.97 Signed 2021-07-03 2021-08-28 2021-07-30 2022-02-24 ations Envelope Informática Agropecuária, p dscape Management arceira do Projeto Paisagens Rurais SFB BR-GIZ-109849-GO-RF Mainstreaning Landscape Pr Request for Quot Single Stage - One Q / Aquisicao de Kits promoc TF / A8532 actices into Selected Water Post Open - National 0.00 Canceled 2021-10-08 2021-12-03 2022-06-01 ations Envelope ionais de comunicacao e inf sheds ormativos EMBRAPA BR-GIZ-162133-G O-RFQ / Compra de materiai s, insumos e equipamentos Institutional Development a Request for Quot Single Stage - One para manutenção da Unidad TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-08-07 2021-10-02 2022-03-31 ations Envelope es Demonstrativas na Embr dscape Management apa Cerrados. (ILP - Experim ento longa duração-Chapad ao + ILPF e pastagem solteir a) Page 2 EMBRAPA BR-GIZ-204510-G O-RFQ / Aquisição de semen tes forrageiras para plantio nas Unidades de Referencia Institutional Development a Request for Quot Single Stage - One Tecnológica (URT) utilizada TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2020-11-20 2021-01-15 2021-07-14 ations Envelope nos treinamentos sobre recu dscape Management peração de vegetação nativ a e pastagens para os 230 t écnicos de ATeG que atende rão os 4 mil proprietários rur ais EMBRAPA BR-GIZ-161606-G O-RFQ / Aquisição de bens e Mainstreaning Landscape Pr equipamentos para o audito Request for Quot Single Stage - One TF / A8532 actices into Selected Water Post Open - National 0.00 Canceled 2021-08-07 2021-10-02 2022-03-31 rio para capacitação na Emb ations Envelope sheds rapa Cerrados. (Som + Imag em + piso + ar condicionad o + cadeiras) EMBRAPA BR-GIZ-109840-G O-RFQ / Aquisição de materi Mainstreaning Landscape Pr Request for Quot Single Stage - One al didático impresso para dis TF / A8532 actices into Selected Water Post Open - National 0.00 Canceled 2021-01-04 2021-03-01 2021-08-28 ations Envelope tribuição nos cursos de cons sheds ervação para os diferentes a tores/públicos. EMBRAPA BR-GIZ-162145-G O-RFQ / Compra de materiai Institutional Development a Request for Quot Single Stage - One s e insumos (gesso) para ma TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-08-07 2021-10-02 2022-03-31 ations Envelope nutenção da URT na Fazend dscape Management a Entre Rios PA-DF (BPA + RAD + Guzerá ). EMBRAPA BR-GIZ-162144-G O-RFQ / Compra de materiai Institutional Development a s, insumos e equipamentos Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 3,551.04 Completed 2021-10-09 2021-12-04 2022-03-04 2022-06-02 2022-03-04 para manutenção da URT na ations Envelope dscape Management Embrapa Cerrados (CTZL - C entro de Tecnologias de Raç as Zebuínas Leiteiras). EMBRAPA BR-GIZ-242450-G O-RFQ / Aquisição de bens e Institutional Development a Request for Quot Single Stage - One equipamentos para estúdio TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-10-09 2021-12-04 2022-06-02 ations Envelope para produção/gravação de dscape Management vídeos para TT, inclusive EA D, da Embrapa Cerrados. EMBRAPA BR-GIZ-242454-G O-RFQ / Compra de materiai Institutional Development a s, insumos e equipamentos Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-10-09 2021-12-04 2022-06-02 para manutenção da URT da ations Envelope dscape Management Embrapa Cerrados na Fazen da Experimental da ABCZ, U beraba-MG EMBRAPA BR-GIZ-109835-G Institutional Development a O-RFQ / Aquisição de equipa Request for Quot Single Stage - One Under Imple TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2019-05-11 2019-07-06 2020-01-02 mentos de informática comp ations Envelope mentation dscape Management utadores, softwares, imagen s, equipamentos, etc.. EMBRAPA BR-GIZ-162146-G O-RFQ / Compra de materiai Institutional Development a Request for Quot Single Stage - One s e insumos para manutenç TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-10-16 2021-12-11 2022-06-09 ations Envelope ão da URT na Fazenda Entre dscape Management Rios PA-DF (BPA + RAD + Guzerá ). EMBRAPA BR-GIZ-254481-G Institutional Development a O-RFQ / Compra de insumos Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-10-15 2021-12-10 2022-06-08 (SULFATO DE AMÔNIO) para ations Envelope dscape Management manutenção da URT EMBRAPA BR-GIZ-254483-G Institutional Development a O-RFQ / Aquisição de agroqu Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 15,725.72 Completed 2021-10-29 2021-12-24 2021-12-15 2022-06-22 2021-12-15 ímicos para Unidades de Ref ations Envelope dscape Management erência Tecnológica (URTs) EMBRAPA BR-GIZ-263852-G O-RFQ / Aquisição de Drone Institutional Development a Request for Quot Single Stage - One para Unidade de Referência TF / A8532 nd Capacity Building for Lan Post Open - National 17,132.65 Completed 2021-11-27 2022-01-22 2022-02-08 2022-07-21 2022-02-08 ations Envelope Tecnológica (URTs) mantida dscape Management pela Embrapa Cerrados SFB BR-GIZ-269451-GO-RF Institutional Development a Q / Aquisição de brindes par Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2021-12-27 2022-02-21 2022-08-20 a distribuição em eventos pr ations Envelope dscape Management esenciais promovidos EMBRAPA BR-GIZ-283623-G O-RFQ / Aquisição de equipa Institutional Development a mento de ultrassom veterin Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-03-16 2022-05-11 2022-11-07 ário para Unidades de Refer ations Envelope dscape Management ência Tecnológica (URTs) m antidas pela Embrapa Cerra dos EMBRAPA BR-GIZ-283624-G Institutional Development a Request for Quot Single Stage - One O-RFQ / Aquisição de equipa TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-03-16 2022-05-11 2022-11-07 ations Envelope mentos informática dscape Management SFB BR-GIZ-291096-GO-RF Q / Aquisição de fitas de pes Institutional Development a Request for Quot Single Stage - One agem para gado para distrib TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-04-23 2022-06-18 2022-12-15 ations Envelope uição em eventos presenciai dscape Management s promovidos no âmbito do Projeto EMBRAPA BR-GIZ-305644-G O-RFQ / Aquisição de equipa Institutional Development a Request for Quot Single Stage - One mentos audiovisuais para ati TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-07-30 2022-09-24 2023-03-23 ations Envelope vidades de EAD promovidas dscape Management pela Embrapa Cerrados EMBRAPA BR-GIZ-305645-G Institutional Development a Request for Quot Single Stage - One O-RFQ / Equipamentos de in TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Completed 2022-08-06 2022-10-01 2023-03-30 2022-12-23 ations Envelope formática para atividades de dscape Management EAD EMBRAPA BR-GIZ-305649-G Institutional Development a Request for Quot Single Stage - One O-RFQ / Móveis para o estúd TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-08-06 2022-10-01 2023-03-30 ations Envelope io dscape Management SFB BR-GIZ-322193-GO-RF Q / Aquisição de equipamen Institutional Development a Request for Quot Single Stage - One tos informática para a execu TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2022-11-12 2023-01-07 2023-07-06 ations Envelope ção das atividades de asses dscape Management soria e coordenação técnica do Serviço Florestal Brasileir o EMBRAPA BR-GIZ-327286-G Institutional Development a O-RFQ / Aquisição de fertiliz Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2022-12-03 2023-01-28 2023-07-27 antes para Unidades de Ref ations Envelope dscape Management erência Tecnológica (URTs) EMBRAPA BR-GIZ-361072-G O-RFQ / Aquisição de fertiliz Institutional Development a antes para manutenção de e Request for Quot Single Stage - One Pending Impl TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-05-15 2023-07-10 2024-01-06 xperimentos de pesquisa na ations Envelope ementation dscape Management Unidades de Referência Tec nológica (URT) mantidas pel a Embrapa Page 3 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendatio Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EMBRAPA 2 BR-GIZ-76293- NC-APA / Fornecimento de c offee break e/ou almoço par a todas as capacitações do c Mainstreaning Landscape Pr Alternative Procur Single Stage - One omp de conserv da paisage / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 Envelope m em cursos, dias de campo sheds ent etc dos técnicos rurais e/ou produtores durante todos o s cursos, seminarios regiona is, excursoes tecnicas EMBRAPA 1 BR-GIZ-76234- NC-APA / Loc. de veiculos pa ra a realização de estudos p Institutional Development a Alternative Procur rospectivos de cenários de c Single Stage - One / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 onservação e produção co Envelope dscape Management ent m tecnologias disponíveis so bre o CAR, PRA, tecnologias do ABC, BPAs, RAD, Legislaç ão de Proteção da Vegetaçã o Nativa EMBRAPA 2 BR-GIZ-76262- NC-APA / Loc de veic para a realização do comp de estud os e cursos de conserv da p Mainstreaning Landscape Pr Alternative Procur Single Stage - One aisagem nos cursos, treinam / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 Envelope , dias de campo etc com te sheds ent cnol disponíveis sobre o CAR , PRA, tecnologias do ABC, B PAs, RAD, Legislação de Prot eção da Vegetação Nativa EMBRAPA 2 BR-GIZ-76236- NC-APA / Contratação de em Mainstreaning Landscape Pr Alternative Procur presa gráfica para a impress Single Stage - One / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2019-01-20 2019-01-25 2019-02-15 2019-02-22 2019-03-15 2019-09-11 ao de material didatico para Envelope sheds ent os cursos de conservação p ara os diferentes atores/púb licos. SFB 1 BR-GIZ-76238-NC-AP A / Contratação de empresa para realização de eventos, Institutional Development a Alternative Procur Single Stage - One cursos, oficinas e reuniões d / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 Envelope e promoção do empoderam dscape Management ent ento local e integração multi -institucional por Bacia selec ionada SFB 2 BR-GIZ-76275-NC-AP A / Contratação de pessoa ju rídica para realizar 10 oficin Mainstreaning Landscape Pr Alternative Procur Single Stage - One as participativas de elaboraç / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 Envelope ão e pactuação do plano, pa sheds ent ra o lançamento e a difusão do plano de ação de cada u ma das bacias SFB 2 BR-GIZ-76286-NC-AP Mainstreaning Landscape Pr Alternative Procur Single Stage - One / Post Open - National 0.00 Canceled 2019-01-15 2019-01-20 2019-02-10 2019-02-17 2019-03-10 2019-09-06 A / Aluguel de veiculos do S actices into Selected Water ement Arrangem Envelope FB sheds ent INPE 1 BR-GIZ-76273-NC-AP Institutional Development a Alternative Procur A / Serviços de organização Single Stage - One / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 de eventos, publicação e div Envelope dscape Management ent ulgação de resultados (map eamento orbital) INPE 1 BR-GIZ-76292-NC-AP Institutional Development a Alternative Procur Single Stage - One A / Locação de Veículo (map / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 Envelope eamento orbital e análise da dscape Management ent paisagem) GIZ 3 BR-GIZ-76290-NC-AP Project Management, Monit Alternative Procur A / Contratação de serviços Single Stage - One / oring, Evaluation and Com Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 para produção dos materiais Envelope munication ent e peças de comunicação do Projeto GIZ 3 BR-GIZ-76276-NC-AP Project Management, Monit Alternative Procur Single Stage - One A / Auditorias Externas Inde / oring, Evaluation and Com Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-10-20 2018-11-10 2018-11-17 2018-12-08 2019-06-06 Envelope pendentes do projeto munication ent SFB BR-GIZ-109851-NC-RFQ Mainstreaning Landscape Pr Request for Quot Single Stage - One TF / A8532 Post Open - National 0.00 Canceled 2019-08-10 2019-10-05 2020-04-02 / Aluguel de veículos do SFB actices into Selected Water ations Envelope sheds INPE BR-GIZ-109968-NC-RF Institutional Development a Request for Quot Single Stage - One Q / Aluguel de sala comercia TF / A8532 nd Capacity Building for Lan Post Open - National 17,449.76 Signed 2019-05-11 2019-07-06 2019-06-24 2020-01-02 ations Envelope l para equipe de técnicos e dscape Management m Campinas/SP GIZ BR-GIZ-109987-NC-RFQ Project Management, Monit / Contratação de serviços pa Request for Quot Single Stage - One TF / A8532 oring, Evaluation and Com Post Open - National 0.00 Canceled 2019-12-07 2020-02-01 2020-07-30 ra produção dos materiais e ations Envelope munication peças de comunicação do Pr ojeto GIZ BR-GIZ-109989-NC-RFQ Project Management, Monit Request for Quot Single Stage - One / Auditorias Externas Indepe TF / A8532 oring, Evaluation and Com Post Open - National 4,214.35 Signed 2019-11-23 2020-01-18 2020-01-16 2020-07-16 ations Envelope ndentes do projeto munication EMBRAPA BR-GIZ-109841-N C-RFQ / Contratação de serv iço de locação de veiculos p ara a realização de estudos Institutional Development a Request for Quot Single Stage - One prospectivos de cenários de TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2019-08-10 2019-10-05 2020-04-02 ations Envelope conservação e produção co dscape Management m tecnologias disponíveis so bre o CAR, PRA, tecnologias do ABC, BPAs, RAD, Legislaç ão de Proteção da Vegetaçã o Nativa INPE BR-GIZ-162154-NC-RF Institutional Development a Q / Contrato ferramentas TI Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2020-04-10 2020-06-05 2020-12-02 para armazenamento de da ations Envelope dscape Management dos e comunicação INPE BR-GIZ-109960-NC-RF Institutional Development a Q / Serviços de organização Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2019-11-09 2020-01-04 2020-07-02 de eventos, publicação e div ations Envelope dscape Management ulgação de resultados (map eamento orbital) INPE BR-GIZ-109964-NC-RF Institutional Development a Request for Quot Single Stage - One Q / Locação de Veículo (map TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2019-11-09 2020-01-04 2020-07-02 ations Envelope eamento orbital e análise da dscape Management paisagem) BR-GIZ-207801-NC-RFQ / A Project Management, Monit Request for Quot Single Stage - One uditorias Externas Independ TF / A8532 oring, Evaluation and Com Post Open - National 14,745.42 Signed 2020-12-07 2021-02-01 2021-01-06 2021-07-31 ations Envelope entes do projeto Exercícios munication 2020/2021 SFB BR-GIZ-161627-NC-RFQ Institutional Development a Request for Quot Single Stage - One / Aquisicao de Kits promocio TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2020-06-07 2020-08-02 2021-01-29 ations Envelope nais de comunicacao e infor dscape Management mativos Page 4 SFB BR-GIZ-161619-NC-RFQ / Produção de material infor Institutional Development a Request for Quot Single Stage - One mativo e vídeo para divulga TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-10-08 2021-12-03 2022-06-01 ations Envelope ção das atuações do SFB inc dscape Management luindo o projeto FIP Paisage m. EMBRAPA BR-GIZ-161972-N Institutional Development a C-RFQ / Alimentação  para o Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2020-04-10 2020-06-05 2020-12-02 s dois cursos presenciais de ations Envelope dscape Management capacitação BPA e RAD. EMBRAPA BR-GIZ-161975-N Institutional Development a C-RFQ / Material de apoio pa Request for Quot Single Stage - One TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-07-05 2021-08-30 2022-02-26 ra os dois cursos presenciais ations Envelope dscape Management de capacitação BPA e RAD. EMBRAPA BR-GIZ-242452-N C-RFQ / Contratação de emp resa da área de construção Institutional Development a Request for Quot Single Stage - One civil para reforma e adequaç TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-10-09 2021-12-04 2022-06-02 ations Envelope ão e manutenção do estúdio dscape Management para produção/gravação de vídeos para TT, inclusive EA D, da Embrapa Cerrados. EMBRAPA BR-GIZ-164514-C W-RFQ / Contratação de em Institutional Development a Request for Quot Single Stage - One presa para instalações de eq TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-10-09 2021-12-04 2022-06-02 ations Envelope uipamentos de Som + Imag dscape Management em + piso + ar condicionad o + cadeiras SFB BR-GIZ-270583-NC-RFQ Institutional Development a / Almoços e coffe-breaks par Request for Quot Single Stage - One Pending Impl TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2022-01-08 2022-03-05 2022-09-01 a oficina que ocorrerá na Ba ations Envelope ementation dscape Management hia entre os dias 24 e 25 de janeiro. SFB BR-GIZ-280725-CS-QCB S / Contratação de empresa para realização de retificaçã o (e/ou atendimentos de not Institutional Development a Single Stage - One ificações) dos imóveis rurais TF / A8532 nd Capacity Building for Lan Post Request for Bids Open - National 0.00 Signed 2022-03-09 2022-03-02 2022-03-14 2022-04-25 2022-03-04 2022-05-25 2022-03-16 2022-06-29 2022-12-26 Envelope já cadastrados na Base do SI dscape Management CAR, bem como a inscrição de imóveis rurais que ainda não possuam o Cadastro Am biental Rural (CAR) SFB BR-GIZ-290637-NC-RFB / Contratação de empresa p Institutional Development a ara produção de pacote de Single Stage - One TF / A8532 nd Capacity Building for Lan Post Request for Bids Open - National 0.00 Signed 2022-04-14 2022-04-20 2022-04-19 2022-05-31 2022-04-20 2022-06-30 2022-07-20 2022-08-04 2023-01-31 quatro vídeos educativos cu Envelope dscape Management rtos com temas de conserva ção e regularização ambient al de imóveis rurais. SFB BR-GIZ-298269-NC-RFQ / Contratação de serviços de infraestrutura e alimentação necessários para a realizaçã Institutional Development a Request for Quot Single Stage - One o de eventos da “Agenda da TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2022-06-11 2022-08-06 2023-02-02 ations Envelope Regularização Ambiental” n dscape Management o âmbito do Projeto “Gestão Integrada de Paisagens no b ioma Cerrado – Paisagens R urais” na Bahia SDI BR-GIZ-312279-NC-RFQ / Realizar a diagramação e r evisão gramatical da publica ção dos resultados de uma d Institutional Development a Request for Quot Single Stage - One Under Imple écada de implementação do TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2022-09-03 2022-10-29 2023-04-27 ations Envelope mentation Plano Setorial de Mitigação dscape Management e de Adaptação às Mudança s Climáticas para a Consolid ação de uma Economia de B aixa Emissão de Carbono na Agricultura - GIZ BR-GIZ-322194-NC-RFQ Project Management, Monit Request for Quot Single Stage - One Under Imple / Auditorias Externas Indepe TF / A8532 oring, Evaluation and Com Post Open - National 0.00 2022-12-03 2023-01-28 2023-07-27 ations Envelope mentation ndentes do projeto Exercício munication s 2022/2023 EMBRAPA BR-GIZ-357696-N C-RFQ / impressão de 500 e Institutional Development a Request for Quot Single Stage - One Pending Impl xemplares da publicação Gu TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-04-29 2023-06-24 2023-12-21 ations Envelope ementation ia de plantas do Cerrado par dscape Management a recomposição da vegetaçã o nativa EMBRAPA BR-GIZ-361378-N C-RFQ / Serviços de reabilita Institutional Development a ção e modernização das cen Request for Quot Single Stage - One Under Imple TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-05-20 2023-07-15 2024-01-11 trais de ar-condicionado do ations Envelope mentation dscape Management prédio do auditório e salas a djacentes da Embrapa Cerra dos, situada em Planaltina/D F CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual EMBRAPA 1 BR-GIZ-76228- CS-CAPA / CI na area de eng Institutional Development a Alternative Procur enharia para elaboracao de / nd Capacity Building for Lan Post ement Arrangem Direct 0.00 Canceled 2018-10-30 2018-12-09 2018-12-30 2019-06-28 projeto basico e executivo p dscape Management ent ara as reformas do auditori o, salas de aula, salas de vid eo e viveiro da EMBRAPA Ce rrados. EMBRAPA 1 BR-GIZ-76229- CS-CAPA / CI para o process amento e sistem da informa Institutional Development a Alternative Procur ção tecnol para a caracteriz / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-30 2018-11-20 2019-01-03 2019-01-31 2019-03-02 2019-04-06 2019-04-27 2020-04-26 ação e análise da estrutura dscape Management ent e da dinâmica das unidades de paisagem para replicabili dade das intervenções de B PA e RAD em diferentes esc alas EMBRAPA 2 BR-GIZ-76270- CS-CAPA / CI para coord, ela boração de cont e apresenta ção de cursos presenciais e Mainstreaning Landscape Pr Alternative Procur a distância no tema conserv / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-11-15 2018-12-06 2019-01-19 2019-02-16 2019-03-18 2019-04-22 2019-05-13 2020-05-12 dos rec nat em temas como sheds ent tecnol de manejo e uso cont rolado do fogo, estrat de rec omp da vegetação nativas e boas praticas agropecuárias EMBRAPA 2 BR-GIZ-76204- CS-CAPA / Contratação de C Mainstreaning Landscape Pr Alternative Procur onsultoria Individual para ap / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-11-15 2018-12-06 2019-01-19 2019-02-16 2019-03-18 2019-04-22 2019-05-13 2020-05-12 resentação de cursos prese sheds ent nciais e a distância no tema conservação dos recursos n aturais (instrutores/equipe d e apoio). Page 5 EMBRAPA 2 BR-GIZ-76254- CS-CAPA / CI para coordenaç ão da coleta de dados na im Mainstreaning Landscape Pr Alternative Procur plantação de tecnologias de / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-11-15 2018-12-06 2019-01-19 2019-02-16 2019-03-18 2019-04-22 2019-05-13 2020-05-12 manejo e uso controlado do sheds ent fogo; estratégias de recomp osição da vegetação nativa e boas praticas agropecuári as, em imoveis rurais assisti dos pelo Projeto EMBRAPA 2 BR-GIZ-76205- CS-CAPA / CI para execução Mainstreaning Landscape Pr Alternative Procur da coleta de dados na impla / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-11-15 2018-12-06 2019-01-19 2019-02-16 2019-03-18 2019-04-22 2019-05-13 2020-05-12 nt de tecnologias de manejo sheds ent e uso controlado do fogo; es tratégias de recomp da veg. nativa e boas praticas agrop ecuárias EMBRAPA 2 BR-GIZ-76277- CS-CAPA / 3 CIs para apoio n a coleta de dados na implan Mainstreaning Landscape Pr Alternative Procur tação de tecnologias de ma / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-10 2018-10-31 2018-12-14 2019-01-11 2019-02-10 2019-03-17 2019-04-07 2020-04-06 nejo e uso controlado do fog sheds ent o, estratégias de recomposi ção da vegetação nativa e b oas praticas agropecuárias. EMBRAPA 2 BR-GIZ-76232- Mainstreaning Landscape Pr Alternative Procur CS-CAPA / CI para levantar s / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-10 2018-10-31 2018-12-14 2019-01-11 2019-02-10 2019-03-17 2019-04-07 2020-04-06 ubsidios para incentivar à ca sheds ent deia produtiva da restauraç ão SFB 1 BR-GIZ-76252-CS-CA PA / Serviços de Consultoria Institutional Development a Alternative Procur jurídica para Classificações / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 para o SICAR no Cerrado, SE dscape Management ent NTINEL ou Sensor Compatív el 1:10.000 - 2016, 2017, 2 018, 2019 SFB 1 BR-GIZ-76264-CS-CA PA / CPJ para realizar diag, mapeam e elaborar portif de Institutional Development a Alternative Procur divulgação da sistematiz de / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 exp de imóveis rurais públ e dscape Management ent priv qto às ativ e empreend de recuperação/recomposiç ão de áreas degradadas, silv icultura e soluções tecnol BP A SFB 1 BR-GIZ-76213-CS-CA PA / CPJ para promoção de u ma melhor comunicacao e Institutional Development a Alternative Procur melhoria institucional das or / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 ganizações (Compatibilizaçã dscape Management ent o de informações sobre o Ce rrado entre o SFB (Inventári o Florestal), INPE (Prodes), E MBRAPA (TerraClass), SENA R, MAPA e MMA) SFB 1 BR-GIZ-76266-CS-CA PA / Contratacao de pessoa j Institutional Development a Alternative Procur uridica para Elaboracao e di / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 sponibilizacao na plataforma dscape Management ent Saberes da Floresta de 10 c ursos com tematica relativa as acoes do projeto SFB 1 BR-GIZ-76237-CS-CA PA / Consultoria pessoa juríd Institutional Development a Alternative Procur ica (OS) para mobilização e / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 apoio à instalação e fortaleci dscape Management ent mento de Comitês de Bacia Hidrográfica SFB 2 BR-GIZ-76243-CS-CA PA / Contratação de Pessoa J Mainstreaning Landscape Pr Alternative Procur urídica (OS) para instalar viv / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 eiros permanentes e tempor sheds ent arios, casa de sementes, pro dução e comercialização de sementes e mudas. SFB 2 BR-GIZ-76249-CS-CA PA / Contratação de pessoa j urídica para desenvolver me Mainstreaning Landscape Pr Alternative Procur todologia de monitoramento / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 de áreas restauradas (fortal sheds ent ecer a oferta de serviços de monitoramento) e aplicação por dois ciclos de monitora mento (T.0, T.1 e T.2). SFB 1 BR-GIZ-76274-CS-CA PA / CI para a elaboração de método, treinamento e apoi Institutional Development a Alternative Procur o à execução da Análise téc / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 nica sobre o CAR e PRAs na dscape Management ent área de abrangência do proj eto no SICAR e elaboração d e materiais específicos da ár ea de abrangência do Projet o. SFB 1 BR-GIZ-76280-CS-CA PA / CI pra a sistematização de informações sobre a área Institutional Development a Alternative Procur selecionada, com a definiçã / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 o da área de abrangência do dscape Management ent projeto, considerando passiv os florestais em APP, RL, áre as passíveis de restauração e análise multicritérios. SFB 2 BR-GIZ-76288-CS-CA PA / Consultoria Individual p Mainstreaning Landscape Pr Alternative Procur ara a definição da estrutura / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 e escopo do plano de ação n sheds ent as 10 bacias selecionadas. SFB 2 BR-GIZ-76244-CS-CA PA / CI para apoiar os treina mento para funcionários pú Mainstreaning Landscape Pr Alternative Procur blicos em legislação ambien / actices into Selected Water Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 tal, especialmente Código Fl sheds ent orestal e as relativas ao CAR , PRA e licenciamento ambie ntal, bem como sobre as eta pas e procedimentos para re alização de CAR e PRA INPE 1 BR-GIZ-76253-CS-CA PA / Contratação de 04 (qua Institutional Development a Alternative Procur tro) consultorias individuais / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 - Serviços de Geoprocessam dscape Management ent ento (mapeamento orbital) INPE 1 BR-GIZ-76241-CS-CA Institutional Development a Alternative Procur PA / Contratação de Consult / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 or individual - Assistente Ge dscape Management ent oprocessamento júnior (anál ise da paisagem) INPE 1 BR-GIZ-76289-CS-CA Institutional Development a Alternative Procur PA / Contratação de Consult / nd Capacity Building for Lan Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 or individual - Serviços de G dscape Management ent eoprocessamento (análise d a paisagem) Page 6 INPE 3 BR-GIZ-76278-CS-CA PA / Contratação de Consult oria pessoa jurídica para a d Project Management, Monit Alternative Procur ifusão e comunicação dos re / oring, Evaluation and Com Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 sultados do projeto em even munication ent tos e reuniões nacionais ou i nternacionais técnicos, acad êmicos e políticos GIZ 3 BR-GIZ-76242-CS-CAP Project Management, Monit Alternative Procur A / Consultoria Individual pa / oring, Evaluation and Com Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 ra elaborar Relatório Final d munication ent e Revisão de Meio Termo GIZ 3 BR-GIZ-76246-CS-CAP Project Management, Monit Alternative Procur A / Consultorias para Suport / oring, Evaluation and Com Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 e Administrativo e de Aquisi munication ent ções ao Projeto (equipe bas e GIZ) GIZ 3 BR-GIZ-76247-CS-CAP Project Management, Monit Alternative Procur A / Consultorias para Suport / oring, Evaluation and Com Post ement Arrangem Open - National 0.00 Canceled 2019-01-15 2019-02-05 2019-03-21 2019-04-18 2019-05-18 2019-06-22 2019-07-13 2020-07-12 e Técnico ao Projeto (equipe munication ent base GIZ) GIZ 3 BR-GIZ-76203-CS-CAP Project Management, Monit Alternative Procur A / Elaboração do Plano de c / oring, Evaluation and Com Post ement Arrangem Open - National 0.00 Canceled 2018-10-15 2018-11-05 2018-12-19 2019-01-16 2019-02-15 2019-03-22 2019-04-12 2020-04-11 omunicação do projeto - co munication ent muncação geral do Projeto GIZ BR-GIZ-109973-CS-CQS / Contratação de Consultoria pessoa jurídica para a difusã Project Management, Monit Consultant Qualifi o e comunicação dos resulta TF / A8532 oring, Evaluation and Com Post Open - National 0.00 Canceled 2019-12-02 2019-12-23 2020-02-05 2020-03-06 2020-04-10 2020-10-07 cation Selection dos do projeto em eventos e munication reuniões nacionais ou intern acionais técnicos, acadêmic os e políticos SFB BR-GIZ-201637-CS-IND V / Contratação de consultor ia pessoa jurídica para mape Institutional Development a amento da cobertura do uso Consultant Qualifi TF / A8532 nd Capacity Building for Lan Post Open - National 25,525.40 Signed 2020-11-04 2021-06-18 2020-11-25 2021-01-08 2021-09-14 2021-02-07 2021-09-17 2021-03-14 2021-10-02 2021-09-10 do solo, hidrografia, relevo e cation Selection dscape Management servidões administrativas da s Bacias Hidrográficas, nos e stados do Tocantins, Maranh ão, Bahia, Minas Gerais, Goi ás e Mato Grosso SFB BR-GIZ-223586-CS-CQS / Contratação de empresa p ara realização de retificação (e/ou atendimentos de notifi Institutional Development a Quality And Cost- cações) dos imóveis rurais j TF / A8532 nd Capacity Building for Lan Post Open - National 169,149.12 Signed 2021-03-14 2021-03-17 2021-04-04 2021-05-18 2021-04-23 2021-06-15 2021-06-24 2021-07-15 2021-08-03 2021-08-19 2021-08-18 2021-09-23 2021-09-02 2022-09-23 Based Selection á cadastrados na Base do SI dscape Management CAR, bem como a inscrição de imóveis rurais que ainda não possuam o Cadastro Am biental Rural (CAR) INPE BR-GIZ-239970-CS-QC Institutional Development a BS / Reformulação do "layou Consultant Qualifi TF / A8532 nd Capacity Building for Lan Post Open - National 29,344.75 Signed 2021-07-25 2021-07-14 2021-08-15 2021-09-28 2021-08-27 2021-10-28 2021-09-10 2021-12-02 2021-09-25 2022-05-31 t" e codificação da nova inte cation Selection dscape Management rface do geoportal e do Web GIS TerraClass SFB BR-GIZ-201638-CS-IND V / Contratação de consultor ia pessoa jurídica para mape Institutional Development a Consultant Qualifi amento da cobertura do uso TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2020-11-04 2020-12-17 2020-11-25 2021-01-08 2021-02-07 2021-03-14 2021-09-10 cation Selection do solo, hidrografia, relevo e dscape Management servidões administrativas da Bacia Hidrográfica 8652, no estado de Mato Grosso do S ul. SFB BR-GIZ-204513-CS-CQS / Contratação de pessoa jurí Institutional Development a dica para mapeamento de c Consultant Qualifi TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2020-11-15 2020-12-17 2020-12-06 2021-01-19 2021-02-18 2021-03-25 2021-09-21 obertura do solo, hidrografia cation Selection dscape Management , relevo e servidões administ rativas das áreas de Cerrad o nos estados do Maranhão e Piauí EMBRAPA BR-GIZ-242457-C S-CQS / Contratação de em presa na área de engenhari Institutional Development a Consultant Qualifi a para elaboração de projet TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2021-10-04 2021-10-25 2021-12-08 2022-01-07 2022-02-11 2022-08-10 cation Selection o básico e executivo para as dscape Management reformas do auditório, salas de aula, salas de video e viv eiro da Embrapa Cerrados GIZ BR-GIZ-245677-CS-CQS / Contratação de consultoria Project Management, Monit Consultant Qualifi PJ para o desenvolvimento d TF / A8532 oring, Evaluation and Com Post Open - National 0.00 Canceled 2021-10-04 2021-08-12 2021-10-25 2021-12-08 2022-01-07 2022-02-11 2022-08-10 cation Selection o Painel Estratégico de Moni munication toramento do Projeto FIP Pai sagens Rurais SFB BR-GIZ-290638-NC-RFQ Institutional Development a / Contratar uma empresa ou Consultant Qualifi TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2022-04-20 2022-05-11 2022-06-24 2022-07-24 2022-08-28 2023-02-24 agência de comunicação par cation Selection dscape Management a realizar 4 palestras presen ciais SFB BR-GIZ-305651-CS-CQS / Contratação de empresa p Institutional Development a Consultant Qualifi ara elaborar e realizar pales TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-08-01 2022-07-25 2022-08-22 2022-10-05 2022-08-09 2022-11-04 2022-10-03 2022-12-09 2023-06-07 cation Selection tras sobre Comunicação e E dscape Management stratégia de Narrativa sobre Regularização Ambiental SDI BR-GIZ-316609-CS-CQS / Consultoria para elaboraçã o dos artefatos para implant ação do Sistema de Governa Institutional Development a Consultant Qualifi Under Implement nça do ABC+ (SIGABC) na e TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2022-09-16 2022-09-29 2022-10-07 2022-11-20 2022-12-20 2023-01-24 2023-07-23 cation Selection ation strutura de TI do MAPA e de dscape Management senvolvimento de painéis de inteligência de negócios (pai néis gerenciais) para o moni toramento e acompanhame nto da execução SFB BR-GIZ-312283-CS-CQS / Prestação de serviços espe Institutional Development a Consultant Qualifi cializados para o desenvolvi TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Canceled 2022-10-31 2022-11-21 2023-01-04 2023-02-03 2023-03-10 2023-09-06 cation Selection mento de Plataforma de Mo dscape Management nitoramento do Projeto Pais agens Rurais | FIP Paisagem SFB BR-GIZ-312280-CS-CQS Institutional Development a / Contratação de empresa e Consultant Qualifi TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-10-31 2022-10-19 2022-11-21 2023-01-04 2022-12-12 2023-02-03 2023-03-22 2023-03-10 2023-09-06 specializada para o desenvo cation Selection dscape Management lvimento de cursos na moda lidade EAD SDI BR-GIZ-320196-CS-CQS Institutional Development a / Contratação de consultoria Consultant Qualifi Under Implement TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2022-11-28 2022-11-18 2022-12-19 2023-02-01 2023-03-03 2023-04-07 2023-10-04 para apoiar elaboração de p cation Selection ation dscape Management rojeto denominado ABC+Fa miliar SDI BR-GIZ-320198-CS-CQS / Contratação de consultoria Institutional Development a Consultant Qualifi para identificar desafios e o TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-11-14 2022-12-07 2022-12-05 2023-01-18 2023-02-27 2023-02-17 2023-04-05 2023-03-24 2023-09-20 cation Selection portunidades para o manejo dscape Management de resíduos da produção ani mal, no âmbito do ABC+. Page 7 SDI BR-GIZ-320199-CS-CQS / Contratação de consultoria para apoiar no aprimoramen Institutional Development a to de questões referentes à Consultant Qualifi Pending Impleme TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2022-11-28 2022-12-19 2023-02-01 2023-03-03 2023-04-07 2023-10-04 valorização das ações do AB cation Selection ntation dscape Management C+ junto ao Inventário Nacio nal de emissões e remoções de GEE relacionadas aos set ores agropecuário e LULUCF INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Con Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultan tract Planned Actual Planned t Actual Planned Actual Planned Actual Planned Actual INPE 1 BR-GIZ-76216-CS-CA PA / Contratação de 01 (um a) consultoria individual - Es Institutional Development a pecialista em Geoprocessam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 107,512.82 Signed 2019-04-22 2019-04-12 2019-06-10 2019-05-14 2019-07-01 2019-06-02 2019-08-05 2019-06-25 2020-02-01 ento Pleno I (mapeamento o ant Selection dscape Management rbital) - Pelas regras da GIZ, trata-se de contrato CLT con forme acordado com o Banc o Mundial na documentação do Projeto. INPE 1 BR-GIZ-76239-CS-CA PA / Contratação de 01 (um a) consultoria individual - A Institutional Development a ssistente em Geoprocessam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 62,476.22 Terminated 2019-04-22 2019-04-10 2019-06-10 2019-05-14 2019-07-01 2019-05-14 2019-08-05 2019-06-25 2020-02-01 ento Júnior (mapeamento or ant Selection dscape Management bital) - Pelas regras da GIZ, t rata-se de contrato CLT conf orme acordado com o Banco Mundial na documentação d o Projeto. GIZ 3 BR-GIZ-76281-CS-CAP A / Consultoria para Gerenci amento e Monitoramento Ge Project Management, Monit Individual Consult ral do Projeto (equipe base TF / A8532 oring, Evaluation and Com Post Open 339,274.24 Signed 2019-04-04 2019-09-01 2019-05-23 2018-12-05 2019-06-13 2019-01-02 2019-07-18 2019-01-11 2020-01-14 ant Selection GIZ) - Pelas regras da GIZ, tr munication ata-se de contrato CLT conf orme acordado com o Banco Mundial na documentação d o Projeto. INPE BR-GIZ-105361-CS-CA PA / Contratação de 01 (um a) consultoria individual - Es Institutional Development a pecialista em Geoprocessam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 107,970.17 Signed 2019-04-22 2019-04-22 2019-06-10 2019-06-09 2019-07-01 2019-06-09 2019-08-05 2019-06-25 2020-02-01 ento Pleno I (mapeamento o ant Selection dscape Management rbital) - Pelas regras da GIZ, trata-se de contrato CLT con forme acordado com o Banc o Mundial na documentação do Projeto. INPE BR-GIZ-105364-CS-CA PA / Contratação de 01 (um a) consultoria individual - Es Institutional Development a pecialista em Geoprocessam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 108,502.36 Terminated 2019-04-22 2019-04-18 2019-06-10 2019-06-05 2019-07-01 2019-06-09 2019-08-05 2019-06-25 2020-02-01 ento Pleno I (mapeamento o ant Selection dscape Management rbital) - Pelas regras da GIZ, trata-se de contrato CLT con forme acordado com o Banc o Mundial na documentação do Projeto. INPE BR-GIZ-105365-CS-CA PA / Contratação de 01 (um a) consultoria individual - Es Institutional Development a pecialista em Geoprocessam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 176,929.50 Terminated 2019-04-22 2019-04-12 2019-06-10 2019-06-09 2019-07-01 2019-06-09 2019-08-05 2019-06-25 2020-02-01 ento Pleno I (mapeamento o ant Selection dscape Management rbital) - Pelas regras da GIZ, trata-se de contrato CLT con forme acordado com o Banc o Mundial na documentação do Projeto. INPE BR-GIZ-105366-CS-CA PA / Contratação de 01 (um a) consultoria individual - Es Institutional Development a pecialista em Geoprocessam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 107,970.17 Signed 2019-04-30 2019-03-06 2019-06-18 2019-06-09 2019-07-09 2019-06-09 2019-08-13 2019-06-24 2020-02-09 ento Pleno I (mapeamento o ant Selection dscape Management rbital) - Pelas regras da GIZ, trata-se de contrato CLT con forme acordado com o Banc o Mundial na documentação do Projeto. INPE BR-GIZ-105367-CS-CA PA / Contratação de 01 (um a) consultoria individual - Es Institutional Development a pecialista em Geoprocessam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 107,970.17 Terminated 2019-04-22 2019-04-10 2019-06-10 2019-05-14 2019-07-01 2019-06-02 2019-08-05 2019-06-24 2020-02-01 ento Pleno I (mapeamento o ant Selection dscape Management rbital) - Pelas regras da GIZ, trata-se de contrato CLT con forme acordado com o Banc o Mundial na documentação do Projeto. INPE BR-GIZ-105369-CS-CA PA / Contratação de 01 (um a) consultoria individual - A Institutional Development a ssistente em Geoprocessam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 62,476.22 Signed 2019-04-22 2019-04-10 2019-06-10 2019-05-14 2019-07-01 2019-06-09 2019-08-05 2019-06-24 2020-02-01 ento Júnior (mapeamento or ant Selection dscape Management bital) - Pelas regras da GIZ, t rata-se de contrato CLT conf orme acordado com o Banco Mundial na documentação d o Projeto. EMBRAPA BR-GIZ-109805-C S-INDV / Contratação de Con sultoria Individual para siste matização de informações s Mainstreaning Landscape Pr Individual Consult obre recuperação de vegeta TF / A8532 actices into Selected Water Post Open 15,617.86 Completed 2019-06-03 2019-04-22 2019-07-22 2019-07-29 2019-08-12 2019-05-02 2019-09-16 2019-05-07 2020-03-14 2019-11-27 ant Selection ção nativa - Pelas regras da sheds GIZ, trata-se de contrato de consultoria conforme acorda do com o Banco Mundial na documentação do Projeto EMBRAPA BR-GIZ-109831-C S-INDV / Contratação de Con sultoria Individual para siste matização de informações s Mainstreaning Landscape Pr Individual Consult obre ILPF, BPA e recuperaçã TF / A8532 actices into Selected Water Post Open 15,710.01 Completed 2019-05-20 2019-05-08 2019-07-08 2019-06-28 2019-07-29 2019-09-03 2019-09-02 2019-07-06 2020-02-29 2020-09-16 ant Selection o de áreas produtivas degra sheds dadas - Pelas regras da GIZ, trata-se de contrato CLT con forme acordado com o Banc o Mundial na documentação do Projeto SFB BR-GIZ-109844-CS-IND V / Contratação de Consultir a Individual para elaborar di agnóstico e caracterização p Mainstreaning Landscape Pr Individual Consult or sensoriamento remoto da TF / A8532 actices into Selected Water Post Open 6,161.37 Completed 2019-08-05 2019-04-25 2019-09-23 2019-05-02 2019-10-14 2019-05-06 2019-11-18 2019-05-07 2020-05-16 2020-01-02 ant Selection s 53 bacias hidrográficas e o sheds DF do Projeto FIP/Paisagem. Pelas regras da GIZ, trata-se de contrato de consultoria c onforme acordado com o BM SFB BR-GIZ-109845-CS-IND V / Contratação de Consultir a Individual para elaborar di agnóstico socio economico a Mainstreaning Landscape Pr Individual Consult mbiental das 53 bacias hidr TF / A8532 actices into Selected Water Post Open 6,198.71 Completed 2019-08-05 2019-04-11 2019-09-23 2019-07-05 2019-10-14 2019-05-02 2019-11-18 2019-05-03 2020-05-16 2020-01-02 ant Selection ográficas e o DF do Projeto F sheds IP/Paisagem. - Pelas regras da GIZ, trata-se de contrato de consultoria conforme aco rdado com o Banco Mundial Page 8 INPE BR-GIZ-109862-CS-IND V / Contratação de Consulto r individual - Assistente Geo Institutional Development a processamento júnior (análi Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 68,160.53 Signed 2019-08-05 2020-09-28 2019-09-23 2020-11-27 2019-10-14 2020-12-02 2019-11-18 2021-01-19 2020-05-16 se da paisagem) - Pelas regr ant Selection dscape Management as da GIZ, trata-se de contra to CLT conforme acordado c om o Banco Mundial na doc umentação do Projeto. GIZ BR-GIZ-109979-CS-IND V / Consultorias para Suport e Administrativo e de Aquisi Project Management, Monit ções ao Projeto (equipe bas Individual Consult TF / A8532 oring, Evaluation and Com Post Open 149,828.12 Signed 2019-04-10 2018-09-14 2019-05-29 2019-02-18 2019-06-19 2019-01-18 2019-07-24 2019-01-22 2020-01-20 e GIZ) - Consultoria Individu ant Selection munication al. Pelas regras da GIZ, trata -se de contrato CLT conform e acordado com o Banco Mu ndial na documentação do P rojeto. GIZ BR-GIZ-109980-CS-IND V / Consultorias para Suport e Técnico ao Projeto (equipe Project Management, Monit Individual Consult base GIZ) - Consultoria Indiv TF / A8532 oring, Evaluation and Com Post Open 67,462.18 Signed 2019-11-04 2020-07-23 2019-12-23 2020-09-17 2020-01-13 2020-09-17 2020-02-17 2020-10-14 2020-08-15 ant Selection idual. Pelas regras da GIZ, tr munication ata-se de contrato CLT conf orme acordado com o Banco Mundial na documentação d o Projeto. GIZ BR-GIZ-109986-CS-IND Project Management, Monit V / Elaboração do Plano de c Individual Consult TF / A8532 oring, Evaluation and Com Post Open 0.00 Canceled 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 omunicação do projeto - co ant Selection munication muncicação geral do Projeto SFB BR-GIZ-109990-CS-IND V / Cont de Cons de Pessoa Física para analisar as infor m cartográficas de inscriçõe Institutional Development a Individual Consult s de imóveis rurais com até TF / A8532 nd Capacity Building for Lan Post Open 15,295.68 Signed 2019-04-22 2019-05-19 2019-06-10 2019-05-15 2019-07-01 2019-06-06 2019-08-05 2019-05-24 2020-02-01 ant Selection 4 módulos fiscais no Cadastr dscape Management o Ambiental Rural do estado do Maranhão (sub lote 1, 2 e 3) para subsídio da qualifica ção da cobertura do uso do solo SFB BR-GIZ-109991-CS-IND V / Cont de Consultoria de P essoa Física para analisar as informações cartográficas d Institutional Development a Individual Consult e inscrições de imóveis rurai TF / A8532 nd Capacity Building for Lan Post Open 4,592.07 Completed 2019-04-15 2019-05-03 2019-06-03 2019-05-15 2019-06-24 2019-05-15 2019-07-29 2019-05-23 2020-01-25 2020-06-09 ant Selection s com até 4 módulos fiscais dscape Management no Cadastro Ambiental Rural do estado do Minas Gerais ( sub-lote 1,2 e 3)o para subsí dio da qualificação da cob d o sol SFB BR-GIZ-109992-CS-IND V / Cont de Consultoria de P essoa Física para analisar as informações cartográficas d Institutional Development a Individual Consult e inscrições de imóveis rurai TF / A8532 nd Capacity Building for Lan Post Open 3,365.43 Completed 2019-04-22 2019-05-02 2019-06-10 2019-05-15 2019-07-01 2019-05-20 2019-08-05 2019-05-21 2020-02-01 2020-06-09 ant Selection s com até 4 módulos fiscais dscape Management no Cadastro Ambiental Rural do estado do Minas Gerais ( sub-lote 4,5 e 6)o para subsí dio da qualificação da cob d o sol SFB BR-GIZ-109993-CS-IND V / Consultoria de Pessoa Fís ica para analisar as informa ções documentais de inscriç Institutional Development a Individual Consult ões de imóveis rurais com at TF / A8532 nd Capacity Building for Lan Post Open 14,413.97 Signed 2019-04-22 2019-04-25 2019-06-10 2019-05-15 2019-07-01 2019-05-16 2019-08-05 2019-05-17 2020-02-01 ant Selection é 4 módulos fiscais no Cada dscape Management stro Ambiental Rural do esta do do Maranhão (sub lote 1, 2 e 3) para subsídio da quali ficação da cobertura do uso do solo SFB BR-GIZ-109996-CS-IND V / Consultoria de Pessoa Fís ica para analisar as informa ções documentais de inscriç Institutional Development a Individual Consult ões de imóveis rurais com at TF / A8532 nd Capacity Building for Lan Post Open 4,751.27 Completed 2019-04-22 2019-04-25 2019-06-10 2019-05-10 2019-07-01 2019-05-15 2019-08-05 2019-05-20 2020-02-01 2020-06-08 ant Selection é 4 módulos fiscais no Cada dscape Management stro Ambiental Rural do esta do de Minas Gerais (sub lote 1 e 2) para subsídio da quali ficação da cobertura do uso do sol SFB BR-GIZ-109997-CS-IND V / Consultoria de Pessoa Fís ica para analisar as informa ções documentais de inscriç Institutional Development a Individual Consult ões de imóveis rurais com at TF / A8532 nd Capacity Building for Lan Post Open 4,003.88 Completed 2019-04-22 2019-04-25 2019-06-10 2019-05-10 2019-07-01 2019-05-20 2019-08-05 2019-05-20 2020-02-01 2020-06-08 ant Selection é 4 módulos fiscais no Cada dscape Management stro Ambiental Rural do esta do de Minas Gerais (sub lote 3 e 4) para subsídio da quali ficação da cobertura do uso do sol SFB BR-GIZ-109998-CS-IND V / Consultoria de Pessoa Fís ica para analisar as informa ções documentais de inscriç Institutional Development a Individual Consult ões de imóveis rurais com at TF / A8532 nd Capacity Building for Lan Post Open 4,009.84 Completed 2019-04-22 2019-04-22 2019-06-10 2019-05-15 2019-07-01 2019-05-20 2019-08-05 2019-05-30 2020-02-01 2020-06-02 ant Selection é 4 módulos fiscais no Cada dscape Management stro Ambiental Rural do esta do de Minas Gerais (sub lote 5 e 6) para subsídio da quali ficação da cobertura do uso do sol SFB BR-GIZ-112004-CS-IND V / Cont de Consultoria de P essoa Física para analisar as informações cartográficas d Institutional Development a Individual Consult e inscrições de imóveis rurai TF / A8532 nd Capacity Building for Lan Post Open 2,024.44 Completed 2019-05-29 2019-05-02 2019-07-17 2019-05-09 2019-08-07 2019-05-14 2019-09-11 2019-05-20 2020-03-09 2020-06-09 ant Selection s com até 4 módulos fiscais dscape Management no Cadastro Ambiental Rural do estado do Minas Gerais ( sub-lote 6)o para subsídio d a qualificação da cob do sol EMBRAPA CERRADO BR-GIZ -150287-CS-INDV / Contrata ção de assessor técnico par Institutional Development a a monitoramento nas áreas Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 50,523.58 Signed 2019-12-16 2020-02-18 2020-02-03 2020-02-19 2020-02-24 2020-02-20 2020-03-30 2020-03-04 2020-09-26 de referência do Projeto Pais ant Selection dscape Management agens Rurais – Gestão Integr ada da Paisagem, na Embra pa Cerrado e em outras Uni dades de Referência Tecnol ógica definidas. SFB BR-GIZ-152976-CS-IND V / Contratação de Assessor Institutional Development a (a) Técnico(a) para apoio à i Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 54,122.00 Signed 2020-01-12 2020-01-08 2020-03-01 2020-02-21 2020-03-22 2020-02-21 2020-04-26 2020-03-03 2020-10-23 mplementação da Regulariz ant Selection dscape Management ação Ambiental nas bacias p rioritárias do projeto Paisage ns Rurais SFB BR-GIZ-160378-CS-IND Institutional Development a V / Elaborar o Plano de Conti Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-02-21 2020-02-20 2020-04-10 2020-05-01 2020-06-05 2020-12-02 nuidade de Negócio do CAR, ant Selection dscape Management suas integrações e o SICAR. Page 9 SFB BR-GIZ-160383-CS-IND V / Contratar consultor para revisar a topologia, configur Institutional Development a ação e desenho da rede de Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-02-21 2020-02-20 2020-04-10 2020-05-01 2020-06-05 2020-12-02 dados atual do SICAR, com o ant Selection dscape Management objetivo de ampliar, agilizar e maximizar o tráfego de da dos internamente dentro da rede dados dos servidores. SFB BR-GIZ-160389-CS-IND Institutional Development a V / Contratar consultor para Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-02-21 2020-02-20 2020-04-10 2020-05-01 2020-06-05 2020-12-02 redesenhar a arquitetura do ant Selection dscape Management ambiente de hardware de se rvidores para o CAR SFB BR-GIZ-164470-CS-IND V / Consultoria para redesen Institutional Development a har todo ambiente de TI que Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 17,130.78 Completed 2020-03-15 2020-03-26 2020-05-03 2020-05-27 2020-05-24 2020-06-12 2020-06-28 2020-06-13 2020-12-25 2021-02-01 sustenta todos os componen ant Selection dscape Management tes do SICAR através do Proj eto Paisagens Rurais (FIP/Pai sagem). EMBRAPA BR-GIZ-166991-C S-INDV / Contratação de Con sultoria CLT para organizar Institutional Development a e elaborar conteúdo técnico Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 59,650.48 Signed 2020-03-31 2020-03-30 2020-05-19 2020-05-14 2020-06-09 2020-05-18 2020-07-14 2020-06-02 2021-01-10 para cursos de capacitação ant Selection dscape Management de multiplicadores sobre rec uperação de áreas com veg etação nativa degradada em paisagem rural no Bioma Ce rrado BR-GIZ-179870-CS-INDV SF B / Contratação de Assessor Project Management, Monit Individual Consult (a) Técnico(a) para apoio à i TF / A8532 oring, Evaluation and Com Post Open 44,613.36 Signed 2020-06-14 2020-06-24 2020-08-02 2020-09-10 2020-08-23 2020-10-02 2020-09-27 2020-10-21 2021-03-26 ant Selection mplementação do Plano de munication Comunicação do projeto Pai sagens Rurais SFB BR-GIZ-181728-CS-IND V / Consultoria para realizar a organização e compilação Institutional Development a das ações realizadas, result Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 21,463.72 Signed 2020-06-28 2020-11-20 2020-08-16 2021-01-05 2020-09-06 2021-01-11 2020-10-11 2021-01-22 2021-04-09 ados alcançados e impactos ant Selection dscape Management observados na implementaç ão do Plano ABC que podem ser estratégicos para o Proje to Paisagens Rurais (FIP/Pais agem). SFB BR-GIZ-182522-CS-IND V / Consultor 04 – Realizar o levantamento, análise e co mpilação dos resultados de Institutional Development a Individual Consult execução de metas, das exp TF / A8532 nd Capacity Building for Lan Post Open 19,883.06 Signed 2020-06-30 2020-07-08 2020-08-18 2020-09-15 2020-09-08 2020-10-02 2020-10-13 2020-10-14 2021-04-11 ant Selection eriencias, perspectivas e co dscape Management mpromissos em nível estadu al no âmbito do Plano ABC e xecutadas pelos Grupos Ges tores Estaduais na região No rdeste SFB BR-GIZ-183115-CS-IND V / Consultor 02 – Organizar Institutional Development a Individual Consult e compilar as propostas par TF / A8532 nd Capacity Building for Lan Post Open 20,472.81 Signed 2020-07-12 2020-12-08 2020-08-30 2021-01-29 2020-09-20 2021-02-04 2020-10-25 2021-02-16 2021-04-23 ant Selection a o desenvolvimento e impl dscape Management ementação do Plano ABC 20 20-2030 SFB BR-GIZ-183116-CS-IND V / Consultor 03 – Realizar o levantamento, análise e co Institutional Development a Individual Consult mpilação das experiências, TF / A8532 nd Capacity Building for Lan Post Open 15,836.01 Completed 2020-07-12 2020-07-16 2020-08-30 2020-09-15 2020-09-20 2020-09-17 2020-10-25 2020-10-02 2021-04-23 2021-09-11 ant Selection perspectivas e compromisso dscape Management s de instituições públicas e p rivadas parceiras na implem entação do Plano ABC SFB BR-GIZ-183117-CS-IND V / Consultor 05 – Realizar o levantamento, análise e co mpilação dos resultados de Institutional Development a Individual Consult execução de metas, das exp TF / A8532 nd Capacity Building for Lan Post Open 20,270.09 Completed 2020-07-12 2020-07-08 2020-08-30 2020-09-17 2020-09-20 2020-09-21 2020-10-25 2020-10-10 2021-04-23 2021-09-11 ant Selection eriencias, perspectivas e co dscape Management mpromissos em nível estadu al no âmbito do Plano ABC e xecutadas pelos Grupos Ges tores Estaduais nas regiões Norte e Cent SFB BR-GIZ-183119-CS-IND V / Consultor 06 – Realizar o levantamento, análise e co mpilação dos resultados de Institutional Development a Individual Consult execução de metas, das exp TF / A8532 nd Capacity Building for Lan Post Open 14,589.57 Signed 2020-07-12 2021-02-08 2020-08-30 2021-04-06 2020-09-20 2021-04-06 2020-10-25 2021-04-09 2021-04-23 ant Selection eriencias, perspectivas e co dscape Management mpromissos em nível estadu al no âmbito do ABC execut adas pelos Grupos Gestores Estaduais nas regiões Sul e Sudeste EMBRAPA BR-GIZ-183568-C S-INDV / Contratação de Con Institutional Development a Individual Consult sultoria Pessoa Física para e TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-07-10 2020-07-10 2020-08-28 2020-09-18 2020-10-23 2021-04-21 ant Selection laborar o logotipo do Projeto dscape Management Paisagens Rurais projeto Pai sagens Rurais SFB BR-GIZ-184435-CS-IND V / Técnico 3 - Contratação de Assessor(a) Técnico(a) p Institutional Development a Individual Consult ara apoio na compilação de TF / A8532 nd Capacity Building for Lan Post Open 67,462.18 Signed 2020-07-17 2020-07-22 2020-09-04 2020-10-02 2020-09-25 2020-10-02 2020-10-30 2020-10-21 2021-04-28 ant Selection dados do CAR e em soluçõe dscape Management s de geoprocessamento / se nsoriamento remoto no âmb ito do projeto Paisagens Rur ais SFB BR-GIZ-184442-CS-IND V / Contratação de Assessor Institutional Development a Individual Consult (a) Técnico(a) para apoio ao TF / A8532 nd Capacity Building for Lan Post Open 72,080.70 Signed 2020-07-17 2020-07-22 2020-09-04 2020-09-14 2020-09-25 2020-09-14 2020-10-30 2020-10-02 2021-04-28 ant Selection desenvolvimento de soluçõe dscape Management s para Regularização Ambie ntal INPE BR-GIZ-137983-CS-IND Institutional Development a V / Assistente Administrativo Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2019-10-18 2019-12-06 2019-12-27 2020-01-31 2020-07-29 para apoiar as atividades rel ant Selection dscape Management acionadas ao mapeamento do projeto INPE BR-GIZ-109857-CS-IND V / Contratação de consultor ia individual - Serviços de G Institutional Development a eoprocessamento (mapeam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 ento orbital) - Pelas regras d ant Selection dscape Management a GIZ, trata-se de contrato d e consultoria conforme acor dado com o Banco Mundial na documentação do Projeto . INPE BR-GIZ-109854-CS-IND Institutional Development a V / Contratação consultoria i Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 ndividual - Serviços de Geo ant Selection dscape Management processamento (mapeamen to orbital) Page 10 INPE BR-GIZ-109859-CS-IND V / Contratação de consultor ia individual - Serviços de G Institutional Development a eoprocessamento (mapeam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 ento orbital) - Pelas regras d ant Selection dscape Management a GIZ, trata-se de contrato d e consultoria conforme acor dado com o Banco Mundial na documentação do Projeto . INPE BR-GIZ-109950-CS-IND V / Contratação de Consulto r individual - Serviços de Ge Institutional Development a oprocessamento (análise da Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2019-09-02 2019-10-21 2019-11-11 2019-12-16 2020-06-13 paisagem) - Pelas regras da ant Selection dscape Management GIZ, trata-se de contrato de consultoria conforme acorda do com o Banco Mundial na documentação do Projeto INPE BR-GIZ-109860-CS-IND V / Contratação de consultor ia individual - Serviços de G Institutional Development a eoprocessamento (mapeam Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2019-08-05 2019-09-23 2019-10-14 2019-11-18 2020-05-16 ento orbital) - Pelas regras d ant Selection dscape Management a GIZ, trata-se de contrato d e consultoria conforme acor dado com o Banco Mundial na documentação do Projeto . INPE BR-GIZ-196031-CS-IND V / Contratação de 01 (uma) consultoria individual - Assis Institutional Development a tente em Geoprocessament Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 36,584.88 Signed 2020-09-28 2020-09-30 2020-11-16 2021-01-06 2020-12-07 2021-01-06 2021-01-11 2021-01-26 2021-07-10 o Júnior (mapeamento orbita ant Selection dscape Management l) - Pelas regras da GIZ, trat a-se de contrato CLT confor me acordado com o Banco Mundial na documentação d o Projeto. INPE EMB BR-GIZ-198052-C S-INDV / Assessor (a) Técnic Institutional Development a o (a) / Analista Junior (a) de Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 36,584.88 Signed 2020-10-13 2020-10-07 2020-12-01 2020-11-23 2020-12-22 2020-11-23 2021-01-26 2021-01-19 2021-07-25 geoprocessamento para ativ ant Selection dscape Management idades de mapeamento do p rojeto FIP Paisagem – “MAPE AMENTO TERRACLASS INPE EMBR BR-GIZ-198053- CS-INDV / Assessor (a) Técni Institutional Development a co (a) / Analista Junior (a) de Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-10-13 2021-02-24 2020-12-01 2020-12-22 2021-01-26 2021-07-25 sistemas para atividades de ant Selection dscape Management apoio ao mapeamento do pr ojeto FIP Paisagem – “MAPE AMENTO TERRACLASS”. INPE BR-GIZ-213289-CS-IND V / Contratação de 01 (uma) consultoria individual - Espe Institutional Development a cialista em Geoprocessamen Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 80,735.91 Terminated 2021-01-25 2021-01-12 2021-03-15 2021-03-01 2021-04-05 2021-03-03 2021-05-10 2021-04-06 2021-11-06 to Pleno I (mapeamento orbi ant Selection dscape Management tal) - Pelas regras da GIZ, tr ata-se de contrato CLT conf orme acordado com o Banco Mundial na documentação d o Projeto. SFB BR-GIZ-228499-CS-IND V / Contratação de Assessor/ a Técnico/a para análise de CAR e desenvolvimento de s Institutional Development a Individual Consult oluções de geoprocessamen TF / A8532 nd Capacity Building for Lan Post Open 66,898.04 Signed 2021-04-12 2021-04-13 2021-05-31 2021-06-22 2021-06-21 2021-06-22 2021-07-26 2021-07-06 2022-01-22 ant Selection to / sensoriamento remoto - dscape Management Pelas regras da GIZ, trata-se de contrato CLT conforme a cordado com o Banco Mundi al na documentação do Proj eto. SFB BR-GIZ-228500-CS-IND V / Contratação de Assessor (a) Técnico(a) para análise d Institutional Development a e documentação de imóveis Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 40,884.49 Signed 2021-04-12 2021-04-13 2021-05-31 2021-06-11 2021-06-21 2021-06-17 2021-07-26 2021-07-06 2022-01-22 rurais inscritos e retificados ant Selection dscape Management no CAR - Pelas regras da GIZ , trata-se de contrato CLT co nforme acordado com o Ban co Mundial na documentaçã o do Projeto. GIZ 3.2 BR-GIZ-238979-CS-I NDV / Contratação de consul Project Management, Monit Individual Consult tor individual para elaborar TF / A8532 oring, Evaluation and Com Post Open 17,699.17 Signed 2021-06-14 2021-06-24 2021-08-02 2021-07-16 2021-08-23 2021-07-21 2021-09-27 2021-08-10 2022-03-26 ant Selection o Relatório de Avaliação par munication a a Revisão de Meio Termo do Projeto FIP Paisagens Rur ais SFB BR-GIZ-161952-CS-IND Institutional Development a Individual Consult V / Retificação dos CARs de i TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-10-04 2020-11-22 2020-12-13 2021-01-17 2021-07-16 ant Selection móveis rurais contemplados dscape Management pelo Projeto SFB BR-GIZ-161969-CS-IND V / Contratação de consultor individual para realizar ofici Institutional Development a nas participativas de elabor Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-06-01 2020-07-20 2020-08-10 2020-09-14 2021-03-13 ação e pactuação do plano, ant Selection dscape Management para o lançamento e a difus ão do plano de ação de cada uma das bacias e mobilizaçã o dos Comitês de Bacias SFB BR-GIZ-161951-CS-IND V / Desenvolvimento de met odologia de monitoramento Institutional Development a Individual Consult de áreas restauradas (fortal TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-06-01 2020-07-20 2020-08-10 2020-09-14 2021-03-13 ant Selection ecer a oferta de serviços de dscape Management monitoramento) e aplicação por dois ciclos de monitora mento (T.0, T.1 e T.2). SFB BR-GIZ-110007-CS-IND V / Consultoria Individual pa ra Produção de material info rmativo para divulgação das Institutional Development a Individual Consult atuação do SFB incluindo o TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2021-10-04 2021-11-22 2021-12-13 2022-01-17 2022-07-16 ant Selection projeto FIP Paisagem - Pelas dscape Management regras da GIZ, trata-se de co ntrato de consultoria confor me acordado com o Banco Mundial na documentação SFB BR-GIZ-110005-CS-IND V / Consultoria Individual pa ra Produção de videos infor Institutional Development a mativos para divulgação do Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2021-10-04 2021-11-22 2021-12-13 2022-01-17 2022-07-16 SFB, incluindo o projeto FIP ant Selection dscape Management Paisagem - Pelas regras da GIZ, trata-se de contrato de consultoria conforme acorda do com o Banco Mundial na documentação SFB BR-GIZ-161954-CS-IND V / Consultoria Individual pa Institutional Development a Individual Consult ra o levantamento, sistemati TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-07-05 2020-08-23 2020-09-13 2020-10-18 2021-04-16 ant Selection zação e divulgação de dado dscape Management s e informações (incluindo e conômicos); SFB BR-GIZ-161618-CS-IND Institutional Development a Individual Consult V / Apoio o fortalecimento d TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-05-03 2020-06-21 2020-07-12 2020-08-16 2021-02-12 ant Selection e redes de sementes dscape Management Page 11 SFB BR-GIZ-161944-CS-IND V / Diagnósticos, mapeamen to e elaboração de portifólio de divulgação da sistematiz Institutional Development a Individual Consult ação de experiências prática TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2020-05-03 2020-06-21 2020-07-12 2020-08-16 2021-02-12 ant Selection s de imóveis rurais públicos dscape Management e privados quanto às ativida des e empreendimentos de recuperação/recomposição de áreas degradadas, silvicu ltura, e solu SFB BR-GIZ-161936-CS-IND Institutional Development a V / Monitoramento e avaliaç Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2021-10-04 2021-11-22 2021-12-13 2022-01-17 2022-07-16 ao das açoes de regularizaç ant Selection dscape Management ao e recuperaçaoambiental EMBRAPA BR-GIZ-161599-C S-INDV / Contratação de Con sultoria Pessoa Física (analis ta) para coordenar a assiste Mainstreaning Landscape Pr Individual Consult ncia tecnica virtual no monit TF / A8532 actices into Selected Water Post Open 0.00 Canceled 2021-07-30 2021-09-17 2021-10-08 2021-11-12 2022-05-11 ant Selection oramento de indicadores tec sheds nicos e socioeconomicos da recuperação das pastagens e de APP e de Reserva Legal das URTs e nas bacias hidro graficas. EMBRAPA BR-GIZ-161526-C S-INDV / Contratação consul tor individual (Pessoa Física - analista) para realizar estu Institutional Development a Individual Consult do prospectivo de análise so TF / A8532 nd Capacity Building for Lan Post Open 31,757.40 Terminated 2021-10-04 2021-11-12 2021-11-22 2022-01-12 2021-12-13 2022-01-27 2022-01-17 2022-01-22 2022-07-16 ant Selection cioeconômica da cadeia da r dscape Management estauração e recomposição da vegetação nativa em APP e ARL nas propriedades rura is e URTs do Distrito Federal e das bacia EMBRAPA BR-GIZ-161529-C S-INDV / Contratação consul tor individual (Pessoa Física - analista) para caracterizaç Institutional Development a Individual Consult ão e análise da estrutura e d TF / A8532 nd Capacity Building for Lan Post Open 31,757.40 Signed 2021-10-04 2021-11-12 2021-11-22 2022-02-03 2021-12-13 2022-02-09 2022-01-17 2022-03-08 2022-07-16 ant Selection a dinâmica das unidades de dscape Management paisagem por meio de levan tamento de campo, process amento e análise de fotogra fias digitais verticais e panor âmicas em pro EMBRAPA BR-GIZ-161602-C S-INDV / Contratação de con sultoria individual (Pessoa Fí sica - analista) para coorden Institutional Development a Individual Consult ação do diagnostico, implant TF / A8532 nd Capacity Building for Lan Post Open 32,524.11 Signed 2021-10-04 2021-10-29 2021-11-22 2022-01-26 2021-12-13 2022-01-27 2022-01-17 2022-02-15 2022-07-16 ant Selection ação e monitoramento das a dscape Management tividades de restauração de vegetação nativa em APP e Reserva Legal em proprieda des rurais e nas URTs do Dis trito Federal e EMBRAPA BR-GIZ-161542-C S-INDV / Contratação de ana lista (CLT) para realização d o diagnostico, implantação e Institutional Development a Individual Consult monitoramento de indicador TF / A8532 nd Capacity Building for Lan Post Open 63,023.14 Signed 2021-10-04 2021-10-29 2021-11-22 2021-12-24 2021-12-13 2022-01-17 2022-01-17 2022-01-25 2022-07-16 ant Selection es tecnicos e socioeconomic dscape Management os de boas práticas e sistem as de produção agropecuári a (recuperação das pastage ns) nas propriedades rurais e URTs do DF e da EMBRAPA BR-GIZ-109839-C S-INDV / Contratação de Con sultoria individual na área d e engenharia para elaboraçã Institutional Development a Individual Consult o de projeto básico e execut TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2021-04-29 2021-06-17 2021-07-08 2021-08-12 2022-02-08 ant Selection ivo para as reformas do aud dscape Management itório, salas de aula, salas d e video e viveiro da EMBRA PA Cerrados - Pelas regras d a GIZ, trata-se de contrato d e consultor SFB BR-GIZ-242063-CS-IND V / Contratação de consultor Institutional Development a ia individual para apoio no d Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2021-10-04 2021-11-22 2021-12-13 2022-01-17 2022-07-16 esenvolvimento e analise de ant Selection dscape Management documentos referentes a im plementação e execução da s ações do SFB no Projeto. SFB BR-GIZ-242068-CS-IND V / Contratação de Assessor/ a Técnico/a Sênior para fort Institutional Development a Individual Consult alecimento da agenda de re TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2021-08-24 2021-08-30 2021-10-12 2021-12-02 2021-11-02 2022-03-11 2021-12-07 2022-06-05 ant Selection gularização ambiental e arti dscape Management culação institucional junto a parceiros estratégicos do Pr ojeto FIP Paisagens Rurais INPE BR-GIZ-254480-CS-IND V / Contratação de 01 (uma) consultoria individual - Espe Institutional Development a cialista em Geoprocessamen Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 47,126.13 Signed 2021-09-21 2021-10-01 2021-11-09 2021-09-20 2021-11-30 2021-09-21 2022-01-04 2021-10-14 2022-07-03 to Pleno I (mapeamento orbi ant Selection dscape Management tal) - Pelas regras da GIZ, tr ata-se de contrato CLT conf orme acordado com o Banco Mundial na documentação d o Projeto. GIZ BR-GIZ-109975-CS-IND Project Management, Monit V / Consultoria Individual pa Individual Consult TF / A8532 oring, Evaluation and Com Post Open 0.00 Canceled 2022-01-03 2022-02-21 2022-03-14 2022-04-18 2022-10-15 ra elaborar Relatório Final d ant Selection munication e Revisão de Meio Termo EMBRAPA BR-GIZ-109803-C S-INDV / Contratação de ana lista (CLT) para o processa mento e sistematização da i Institutional Development a Individual Consult nformação tecnológica para TF / A8532 nd Capacity Building for Lan Post Open 0.00 Canceled 2021-10-04 2021-11-22 2021-12-13 2022-01-17 2022-07-16 ant Selection a caracterização da estrutur dscape Management a e da dinâmica das unidade s de paisagem com interven ções técnicas de boas prátic as e sistemas de produção a gropecuária (recupe INPE BR-GIZ-264686-CS-IND Institutional Development a V / Analista Pleno/a de geop Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2021-11-28 2021-11-24 2022-01-16 2022-02-15 2022-02-06 2022-03-21 2022-03-13 2022-09-09 rocessamento para atividad ant Selection dscape Management es de mapeamento GIZ BR-GIZ-269444-CS-IND Project Management, Monit Individual Consult Under Implement V / Consultoria para Suporte TF / A8532 oring, Evaluation and Com Post Open 0.00 2022-01-03 2021-12-22 2022-02-21 2022-03-24 2022-03-14 2022-03-24 2022-04-18 2022-10-15 ant Selection ation Técnico ao Projeto (equipe b munication ase GIZ) INPE BR-GIZ-270564-CS-IND V / Desenvolvedor/a / Geren Mainstreaning Landscape Pr Individual Consult Under Implement ciador/a de Banco de Dados TF / A8532 actices into Selected Water Post Open 0.00 2022-01-03 2022-01-05 2022-02-21 2022-07-07 2022-03-14 2022-02-07 2022-04-18 2022-10-15 ant Selection ation para atividades de Monitora sheds mento do Desmatamento no Cerrado Brasileiro Page 12 INPE BR-GIZ-270566-CS-IND V / Coordenador/a de Projet Mainstreaning Landscape Pr Individual Consult o de geoprocessamento par TF / A8532 actices into Selected Water Post Open 38,755.42 Signed 2022-01-03 2022-01-05 2022-02-21 2022-02-25 2022-03-14 2022-03-02 2022-04-18 2022-03-15 2022-10-15 ant Selection a atividades de Monitorame sheds nto do Desmatamento no Ce rrado Brasileiro INPE BR-GIZ-270570-CS-IND V / Auditores/as Plenos de g Mainstreaning Landscape Pr Individual Consult eoprocessamento para ativi TF / A8532 actices into Selected Water Post Open 27,186.90 Signed 2022-01-03 2022-01-05 2022-02-21 2022-02-23 2022-03-14 2022-02-23 2022-04-18 2022-03-04 2022-10-15 ant Selection dades de Monitoramento do sheds Desmatamento no Cerrado Brasileiro BR-GIZ-270574-CS-INDV / A uditores/as Plenos de geopr Mainstreaning Landscape Pr Individual Consult ocessamento para atividade TF / A8532 actices into Selected Water Post Open 0.00 Signed 2022-01-03 2022-01-05 2022-02-21 2022-02-23 2022-03-14 2022-02-23 2022-04-18 2022-10-15 ant Selection s de Monitoramento do Des sheds matamento no Cerrado Bras ileiro INPE BR-GIZ-270578-CS-IND V / Auditores/as Seniores de Mainstreaning Landscape Pr Individual Consult Under Implement geoprocessamento para ativ TF / A8532 actices into Selected Water Post Open 0.00 2022-01-03 2022-01-05 2022-02-21 2022-02-25 2022-03-14 2022-03-14 2022-04-18 2022-10-15 ant Selection ation idades de Monitoramento do sheds Desmatamento no Cerrado Brasileiro INPE BR-GIZ-270580-CS-IND V / Auditores/as Seniores de Mainstreaning Landscape Pr Individual Consult geoprocessamento para ativ TF / A8532 actices into Selected Water Post Open 0.00 Signed 2022-01-03 2022-01-05 2022-02-21 2022-02-25 2022-03-14 2022-02-14 2022-04-18 2022-10-15 ant Selection idades de Monitoramento do sheds Desmatamento no Cerrado Brasileiro INPE BR-GIZ-277577-CS-IND Institutional Development a V / Analista Pleno/a de geop Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2022-03-07 2022-02-09 2022-04-25 2022-03-24 2022-05-16 2022-04-08 2022-06-20 2022-12-17 rocessamento para atividad ant Selection dscape Management es de mapeamento BR-GIZ-277578-CS-INDV / A Institutional Development a Individual Consult nalista Pleno/a de geoproces TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2022-03-07 2022-02-09 2022-04-25 2022-03-24 2022-05-16 2022-04-08 2022-06-20 2022-12-17 ant Selection samento para atividades de dscape Management mapeamento GIZ BR-GIZ-280764-CS-IND Project Management, Monit Individual Consult Under Implement V / Moderador da Oficina de TF / A8532 oring, Evaluation and Com Post Open 0.00 2022-02-28 2022-03-07 2022-04-18 2023-04-14 2022-05-09 2022-04-20 2022-06-13 2022-12-10 ant Selection ation Revisão de Meio Termo munication SDI BR-GIZ-283625-CS-IND V / Consultoria para apoio à Institutional Development a Individual Consult identificação, seleção, verifi TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2022-03-11 2022-03-21 2022-04-29 2022-08-25 2022-05-20 2022-08-25 2022-06-24 2022-12-21 ant Selection cação e avaliação de novos dscape Management potenciais SPSABC a serem i ncluídos no Plano ABC+ SDI BR-GIZ-283626-CS-IND V / Analisar e propor mecani smos de reconhecimento e Institutional Development a Individual Consult valorização para propriedad TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2022-03-11 2022-03-21 2022-04-29 2023-01-16 2022-05-20 2023-01-26 2022-06-24 2022-12-21 ant Selection es e produtos relacionados a dscape Management os Sistemas, Práticas, Produ tos e Processos de Produção Sustentáveis (SPSABC) SDI BR-GIZ-283705-CS-IND V / apoiar os Grupos Gestore Institutional Development a Individual Consult s Estaduais da região Norde TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2022-03-11 2022-04-27 2022-04-29 2022-06-02 2022-05-20 2022-08-03 2022-06-24 2022-12-21 ant Selection ste para atualização e propo dscape Management sição de Planos de Ação Est aduais alinhados ao ABC+ SDI BR-GIZ-283710-CS-IND V / Consultoria para apoiar o Institutional Development a s Grupos Gestores Estaduais Individual Consult TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2022-03-11 2022-04-27 2022-04-29 2022-07-06 2022-05-20 2022-08-03 2022-06-24 2022-12-21 da região Centro-Oeste para ant Selection dscape Management atualização e proposição de Planos de Ação Estaduais ali nhados ao ABC+ SDI BR-GIZ-283715-CS-IND V / Consultoria para apoiar o Institutional Development a s Grupos Gestores Estaduais Individual Consult Under Implement TF / A8532 nd Capacity Building for Lan Post Open 0.00 2022-03-11 2022-04-27 2022-04-29 2022-08-03 2022-05-20 2022-08-16 2022-06-24 2022-12-21 da região Sudeste para atua ant Selection ation dscape Management lização e proposição de Plan os de Ação Estaduais alinha dos ao ABC+ EMBRAPA BR-GIZ-298267-C S-INDV / Contratação consul tor individual (Pessoa Física - analista) para realizar estu Institutional Development a Individual Consult do prospectivo de análise so TF / A8532 nd Capacity Building for Lan Post Open 0.00 Signed 2022-06-13 2022-06-10 2022-08-01 2022-07-18 2022-08-22 2022-07-18 2022-09-26 2023-03-25 ant Selection cioeconômica da cadeia da r dscape Management estauração e recomposição da vegetação nativa em APP e ARL nas propriedades rura is e URTs do Distrito Federal e das bacia INPE BR-GIZ-298268-CS-IND V / Contratação de Consulto r individual - Assistente Geo Institutional Development a processamento júnior (análi Individual Consult Under Implement TF / A8532 nd Capacity Building for Lan Post Open 0.00 2022-06-06 2022-06-03 2022-07-25 2022-08-15 2022-08-15 2022-08-17 2022-09-19 2023-03-18 se da paisagem) - Pelas regr ant Selection ation dscape Management as da GIZ, trata-se de contra to CLT conforme acordado c om o Banco Mundial na doc umentação do Projeto. COM BR-GIZ-310605-CS-IN DV / Contratação de consult oria pessoa física para exec Project Management, Monit Individual Consult Under Implement ução de serviços especializa TF / A8532 oring, Evaluation and Com Post Open - National 0.00 2022-08-29 2022-08-24 2022-10-17 2022-09-26 2022-11-07 2022-09-30 2022-12-12 2023-06-10 ant Selection ation dos em customização de pai munication néis gerenciais dinâmicos b aseados em solução de Pow er BI (Business Intelligence) SFB BR-GIZ-316624-CS-IND V / Assessor/a Técnico/a par Institutional Development a a apoiar o Serviço Florestal Individual Consult TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-09-16 2022-09-29 2022-11-04 2022-12-30 2022-11-25 2023-01-04 2022-12-30 2023-06-28 Brasileiro (SFB/MAPA) em aç ant Selection dscape Management ões estratégicas de planeja mento e execução das ativid ades EMBRAPA BR-GIZ-320200-C S-INDV / Contratação de con sultoria individual (Pessoa Fí sica - analista) para coorden Institutional Development a Individual Consult ação do diagnostico, implant TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-10-31 2022-10-27 2022-12-19 2022-12-28 2023-01-09 2023-01-04 2023-02-13 2023-08-12 ant Selection ação e monitoramento das a dscape Management tividades de restauração de vegetação nativa em APP e Reserva Legal em proprieda des rurais e nas URTs do Dis trito Federal INPE BR-GIZ-320201-CS-IND Institutional Development a V / Analista Pleno/a de geop Individual Consult TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-11-28 2022-11-03 2023-01-16 2022-09-19 2023-02-06 2022-10-31 2023-03-13 2023-09-09 rocessamento para atividad ant Selection dscape Management es de mapeamento INPE BR-GIZ-327287-CS-IND Institutional Development a V / Analista Pleno/a de geop Individual Consult TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-11-28 2022-11-25 2023-01-16 2022-12-13 2023-02-06 2023-03-31 2023-03-13 2023-09-09 rocessamento para atividad ant Selection dscape Management es de mapeamento Page 13 SFB BR-GIZ-161615-CS-IND V / Prestação de serviços téc nicos especializados em pro Institutional Development a cessos de educação em am Individual Consult TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2022-12-13 2023-01-10 2023-01-31 2023-03-10 2023-02-21 2023-03-13 2023-03-28 2023-09-24 biente virtual de aprendizag ant Selection dscape Management em para realizar a facilitaçã o, moderação, monitoria e g estão do Portal Saberes da F loresta e dos curso INPE BR-GIZ-343766-CS-IND Institutional Development a V / Contratação de Consulto Individual Consult TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 Signed 2023-02-17 2023-02-22 2023-04-07 2023-05-05 2023-04-28 2023-05-05 2023-06-02 2023-11-29 r individual - Assistente Geo ant Selection dscape Management processamento júnior (análi se da paisagem) SFB BR-GIZ-343769-CS-IND Institutional Development a V / Contratação de pessoa fí Individual Consult Under Implement TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-02-27 2023-02-22 2023-04-17 2023-04-19 2023-05-08 2023-06-12 2023-12-09 sica especializada para análi ant Selection ation dscape Management se de Cadastros Ambientais Rurais - CAR em bacias SFB BR-GIZ-350696-CS-IND V / Contratação de consultor ia pessoa física especializad Institutional Development a Individual Consult Under Implement a para análise de Cadastros TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-03-28 2023-03-20 2023-05-16 2023-06-06 2023-07-11 2024-01-07 ant Selection ation Ambientais Rurais - CAR em dscape Management bacias do Projeto Paisagens Rurais (FIP/Paisagem) no est ado de Minas Gerais. SDI BR-GIZ-350698-CS-IND V / Consultoria para aprimor Institutional Development a ar o reporte de ações do AB Individual Consult Pending Impleme TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-03-28 2023-05-16 2023-06-06 2023-07-11 2024-01-07 C+ no âmbito do Inventário ant Selection ntation dscape Management Nacional de emissões e rem oções de GEE relacionadas a os setores agropecuário e L ULUCF GIZ BR-GIZ-357685-CS-IND Project Management, Monit Individual Consult Under Implement V / Consultoria para Suporte TF / A8532 oring, Evaluation and Com Post Open - National 0.00 2023-04-24 2023-05-03 2023-06-12 2023-07-03 2023-08-07 2024-02-03 ant Selection ation Técnico ao Projeto (equipe b munication ase GIZ) SFB BR-GIZ-361336-CS-IND V / Para apoiar o Serviço Flo Institutional Development a restal Brasileiro (SFB/MAPA) Individual Consult Pending Impleme TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-05-22 2023-07-10 2023-07-31 2023-09-04 2024-03-02 em ações estratégicas de pl ant Selection ntation dscape Management anejamento e execução das atividades voltadas à Cadeia do Restauro SFB BR-GIZ-364453-CS-IND V / Para apoiar o Serviço Flo restal Brasileiro (SFB/MMA) quanto ao planejamento e e Institutional Development a Individual Consult Under Implement xecução das atividades estr TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-06-26 2023-06-05 2023-08-14 2023-09-04 2023-10-09 2024-04-06 ant Selection ation atégicas da plataforma EaD dscape Management Portal Saberes da Floresta n o âmbito do Projeto “Gestão Integrada de Paisagens no B ioma Cerrado – FIP Paisagen s Rurais” SFB BR-GIZ-364454-CS-IND V / Contratação de Assessor (a) Técnico(a) Sênior para e Institutional Development a Individual Consult Pending Impleme struturar e coordenar uma e TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-06-26 2023-08-14 2023-09-04 2023-10-09 2024-04-06 ant Selection ntation stratégia de Gestão Integrad dscape Management a da Paisagem (GIP) e uma das áreas de atuação do pro jeto FIP Paisagens Rurais SFB BR-GIZ-364456-CS-IND V / apoiar o Serviço Florestal Brasileiro (SFB/MAPA) em aç Institutional Development a Individual Consult Pending Impleme ões estratégicas de planeja TF / A8532 nd Capacity Building for Lan Post Open - National 0.00 2023-06-26 2023-08-14 2023-09-04 2023-10-09 2024-04-06 ant Selection ntation mento e execução das ativid dscape Management ades relacionadas à Regular ização Ambiental, no âmbito do Projeto FIP Paisagens Rur ais Page 14 PROCUREMENT PLAN Project information: NIGERIA AGILE PROJECT P 170664 Project Implementation agency: FEDERAL MINISTRY OF EDUCATION Date of the Procurement Plan: 2021-10-25 Period covered by this Procurement Plan: 2021-2023] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Bureau of Public Procurement Act (PPA 2007), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations.. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods, Services and Works Goods: is not applicable. Works: is not applicable. Other Relevant Procurement Information. Procedures for CDD components: PROCUREMENT Nigeria : Adolescent Girls Initiative for Learning and Empowerment PLAN General Information Country: Nigeria 2022-03-14 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170664 GPN Date: Project Name: Adolescent Girls Initiative for Learning and Empowerment Loan / Credit No: IDA / 67380 Borno State AGILE Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BOAGILE/CW/RFB/043/2021 / Request for Bids - CONSTRUCTION OF 10 SENIO Creating Safe and Accessibl Single Stage - One E Small Works SPD 2023-03-2 IDA / 67380 Post Request for Bids Open - National 3,003,750.00 0.00 Canceled 2022-08-10 2022-08-15 2022-09-14 2022-09-17 2022-09-21 R SECONDARY SCHOOLS IN V e Learning Spaces nvelope (1 envelope proce 0 ARIOUS LOCATIONS IN BORN ss) O STATE BOAGILE/CW/RFB/003/2022 / PROCUREMENT OF CONTRAC Request for Bids - TS FOR CONSTRUCTION OF J Creating Safe and Accessibl Single Stage - One E Small Works SPD 2023-04-1 IDA / 67380 Post Request for Bids Limited 4,326,816.98 0.00 Canceled 2022-09-01 2022-09-15 2022-09-08 2022-09-29 2022-10-06 2022-10-15 UNIOR AND SENIOR SECOND e Learning Spaces nvelope (1 envelope proce 3 ARY SCHOOLS IN SOUTHERN ss) CENTRAL OF BORNO STATE L OT 1 & 2 (PACKAGE B) BOAGILE/CW/RFB/002/2022 / PROCUREMENT OF CONTRAC Request for Bids - TS FOR CONSTRUCTION OF J Creating Safe and Accessibl Single Stage - One E Small Works SPD 2023-04-1 IDA / 67380 Post Request for Bids Limited 5,250,654.63 0.00 Canceled 2022-09-01 2022-09-15 2022-09-08 2022-09-29 2022-10-06 2022-10-15 UNIOR AND SENIOR SECOND e Learning Spaces nvelope (1 envelope proce 3 ARY SCHOOLS IN NOTHERN C ss) ENTRAL OF BORNO STATE LO T 1-3 (PACKAGE A) BOAGILE/2022/064 / THE PR Request for Bids - OCUREMENT OF CONTRACTS Creating Safe and Accessibl Single Stage - One E Small Works SPD 10,000,000.0 2023-08-1 FOR THE CONSTRUCTION OF IDA / 67380 Prior Request for Bids Open - National 0.00 Canceled 2022-11-08 2022-11-21 2022-11-13 2022-11-23 2022-12-13 2022-12-28 2023-01-12 2023-06-15 2023-02-16 e Learning Spaces nvelope (1 envelope proce 0 5 JUNIOR AND SENIOR SCHOOL ss) S IN BORNO STATE (LOTS 1-5 ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BOAGILE/GD/21/006 / Procur Project management and sy Request for Quota Single Stage - One E IDA / 67380 Post Limited 20,500.00 20,250.15 Completed 2022-02-16 2022-03-07 2022-03-08 2022-03-23 2022-05-07 2022-03-24 ement of 1 Generator set (40 stem strengthening tions nvelope KVA). BOAGILE/GD/2021/014 / AGI Project management and sy Request for Quota Single Stage - One E LE campaign materials (Bill b IDA / 67380 Post Limited 20,000.00 20,000.01 Completed 2022-03-25 2022-03-04 2022-04-14 2022-03-18 2022-10-11 2022-03-22 stem strengthening tions nvelope oards, T-shirts, face caps and Print materials) BOAGILE/GD/21/007 / Procur ement of 90 tablets for the f Project management and sy Request for Quota Single Stage - One E IDA / 67380 Post Limited 65,749.00 0.00 Completed 2022-04-08 2022-12-30 2022-04-28 2022-06-27 ocal persons and G&C and 1 stem strengthening tions nvelope 62 Tablets to EMIS and Qualit y Assurance BOAGILE/GD/21/005 / Procur Project management and sy Request for Quota Single Stage - One E ement of 2 Monitoring Vehicl IDA / 67380 Post Limited 194,647.00 138,177.46 Completed 2022-04-23 2022-04-11 2022-05-13 2022-05-10 2022-08-11 2022-07-05 stem strengthening tions nvelope es (1 Pick up & 1 16 Seater B us). BOAGILE/GD/21/003 / Procur ement of Office equipment's for PIU (17 members) - Execu Project management and sy Request for Quota Single Stage - One E IDA / 67380 Post Limited 60,000.00 31,053.07 Completed 2022-04-14 2022-03-04 2022-05-04 2022-03-18 2022-08-02 2022-03-22 tive tables/chairs, Conferenc stem strengthening tions nvelope e table/chairs, other office ac cessories and 20 Computer L aptops for PIUs BOAGILE/GD/21/002 / Procur ement of 680 Desktop Comp Fostering an enabling enviro Single Stage - One E uters for 40 selected Senior S IDA / 67380 Post Request for Bids Limited 663,809.00 0.00 Completed 2022-07-29 2022-10-05 2022-07-31 2022-10-06 2022-08-14 2022-10-20 2022-08-19 2022-10-19 2022-08-23 2022-10-22 2022-12-22 nment for girls nvelope econdary Schools in Borno St ate for Digital Skills Training (Phase I). NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BOAGILE/GD/2021/031 / pro Project management and sy Request for Quota Single Stage - One E duction and distribution of 82 IDA / 67380 Post Limited 120,000.00 0.00 Canceled 2022-07-09 2022-07-29 2022-09-27 stem strengthening tions nvelope ,234 identification card for al l the students. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BOAGILE/CS/2021/009 / Eng agement of consultant / com Fostering an enabling enviro Consultant Qualifi munication firm with SPIU for IDA / 67380 Post Limited 15,000.00 14,963.86 Signed 2022-03-01 2022-03-23 2022-03-15 2022-03-21 2022-03-17 2022-04-18 2022-03-21 2022-04-29 2022-09-17 2022-05-02 nment for girls cation Selection content(key messages) devel opment on communication a nd social norms BOAGILE/CS/2021/023 / Dev elopment of Digital skills curr Project management and sy Consultant Qualifi IDA / 67380 Post Limited 12,500.00 0.00 Canceled 2022-03-07 2022-03-23 2022-03-21 2022-03-23 2022-03-27 2022-09-23 iculum by implementing part stem strengthening cation Selection ners, based on Identified gap Page 1 BOAGILE/CS/2021/027 / Eng agement of partner for digita l skills training for girls and b oys on basic ICT skills, includi Fostering an enabling enviro Consultant Qualifi IDA / 67380 Post Limited 55,000.00 0.00 Canceled 2022-03-07 2022-03-23 2022-03-21 2022-03-23 2022-03-27 2022-09-23 ng STEAM activities from 40 nment for girls cation Selection pilot school to be able to navi gate internet, search, locate, access and critically evaluate information on the web BOAGILE/TR/2021/028 / Eng agement of consultant for th e Training of 80 teachers on Project management and sy Consultant Qualifi Digital Literacy Skills on GSM IDA / 67380 Post Limited 36,545.00 0.00 Canceled 2022-04-29 2022-03-23 2022-05-13 2022-05-15 2022-05-19 2022-11-15 stem strengthening cation Selection /Mobile phones assembly, re pair of solar panel, maintena nce and repair of Kyan machi ne in 40 targeted schools BOAGILE/TR/2021/029 / Con duct of remote learning progr Project management and sy Consultant Qualifi ammes with the engagement IDA / 67380 Post Limited 75,000.00 0.00 Canceled 2022-05-11 2022-03-23 2022-05-25 2022-05-27 2022-05-31 2022-11-27 stem strengthening cation Selection of media houses (NTA, BRTV, RADIO-BRTV and PEACE FM) BOAGILE/CS/2021/034 / Eng agement of consultant to co Project management and sy Consultant Qualifi nduct a state wide security a IDA / 67380 Post Limited 62,500.00 60,599.04 Signed 2022-04-06 2022-03-23 2022-04-20 2022-03-15 2022-04-22 2022-04-01 2022-04-26 2022-04-12 2022-10-23 stem strengthening cation Selection ssessments and to develop S ecurity Management Plan (S MP) BOAGILE/TR/2021/037 / Trai ning of 90 EMIS Desk Officers Project management and sy Consultant Qualifi IDA / 67380 Post Limited 23,172.50 0.00 Completed 2022-04-29 2022-06-16 2022-05-13 2022-08-29 2022-05-15 2022-08-29 2022-05-19 2022-11-15 2022-11-30 of SSS in the state on the ne stem strengthening cation Selection w techniques of data collecti on BOAGILE/CS/2021/038 / Eng agement of consultant to dev Project management and sy Consultant Qualifi IDA / 67380 Post Limited 30,000.00 0.00 Signed 2022-07-01 2022-03-23 2022-07-15 2023-04-24 2022-07-17 2023-05-12 2022-07-21 2023-01-17 elop teachers recruitment m stem strengthening cation Selection anagement and delopment p olicy BOAGILE/CS/2021/039 / cap acity building for M&E officer Project management and sy Consultant Qualifi IDA / 67380 Post Limited 18,370.00 0.00 Completed 2022-04-28 2023-03-29 2022-05-12 2022-04-14 2022-05-14 2022-05-03 2022-05-18 2022-11-14 s and education secretaries o stem strengthening cation Selection n monitory and evaluation ac tivities BOAGILE/CS/2021/042 / Cap acity building for 70 EMIS, qu Project management and sy Consultant Qualifi Under Implement IDA / 67380 Post Limited 13,904.50 0.00 2022-08-01 2022-03-23 2022-08-15 2022-08-17 2022-08-21 2023-02-17 ality assurance and M&E offic stem strengthening cation Selection ation ers on the use of KOBO tool box BOAGILE/CS/2021/032 / Eng agement of local consultant f or the Identification of 50,00 Project management and sy Consultant Qualifi IDA / 67380 Post Limited 72,992.00 97,523.35 Completed 2022-04-13 2022-06-16 2022-04-27 2022-05-03 2022-04-29 2022-05-26 2022-05-03 2022-06-04 2022-10-30 2022-08-03 0 Poor/ vulnerable house hol stem strengthening cation Selection ds in secondary schools and monitoring of students (girls /boys) for 1st, 2nd & 3rd ter ms. BOAGILE/CS/2021/021 / Adv ocacy/Engagement of comm unity/ state level stakeholder s i.e. MWA, SPHCDA,CSO, Wo Creating Safe and Accessibl Consultant Qualifi Pending Impleme men Leaders, youth leaders, IDA / 67380 Post Limited 50,000.00 0.00 2022-04-05 2022-04-19 2022-04-21 2022-04-25 2022-10-22 e Learning Spaces cation Selection ntation Traditional leaders, teachers e.t.c for curriculum review sa fe space activities and Medi a sensitization and campaign on Adolescent girls/boys BOAGILE/CS/2021/024 / Dev Project management and sy Consultant Qualifi elopment of Training Manual IDA / 67380 Post Limited 37,500.00 0.00 Canceled 2022-03-08 2022-03-23 2022-03-22 2022-03-24 2022-03-28 2022-09-24 stem strengthening cation Selection for Teachers and Students on digital skills. BOAGILE/TR/2021/026 / Trai ning of 120 Teachers in 40 se lected Secondary Schools on Project management and sy Consultant Qualifi IDA / 67380 Post Limited 50,350.00 0.00 Canceled 2022-06-27 2022-11-01 2022-07-11 2022-07-13 2022-07-17 2022-08-16 the use and application of Ky stem strengthening cation Selection an e-learning Technology wit h engagement of SMoE and p artners. BOAGILE/CS/2021/018 / Eng agement of implementing pa Project management and sy Consultant Qualifi IDA / 67380 Post Limited 37,500.00 0.00 Canceled 2022-05-27 2022-06-10 2022-06-12 2022-06-16 2022-12-13 rtner to develop the curriculu stem strengthening cation Selection m and implementation of saf e space. BOAGILE/2021/024 / ENGAG EMENT OF CONSULTANT TO DEVELOP TRAINING MANUAL Creating Safe and Accessibl Consultant Qualifi IDA / 67380 Post Limited 52,000.00 0.00 Canceled 2022-07-28 2022-07-28 2022-08-11 2022-08-13 2022-08-17 2022-09-16 S FOR STUDENT AND TEACH e Learning Spaces cation Selection ERS ON DIGITAL SKILLS AND CONDUCT TOT TRAINING ON DIGITAL LITERACY BOAGILE/CS/032/022 / PART NERING WITH PRODUCTION F IRM/PARTNERS/NGOS TO PR ODUCE SPECIFIC TARGET AU Fostering an enabling enviro Consultant Qualifi IDA / 67380 Post Limited 45,000.00 0.00 Completed 2022-08-01 2022-07-28 2022-08-15 2022-08-22 2022-08-17 2022-08-16 2022-08-21 2022-11-19 DIENCE RADIO, TV DRAMA SE nment for girls cation Selection RIES, KANURI, HAUSA, BABU R-BURA AND SHUWA ARAB S ONGS FOCUSSING ON THE SI GNIFICANCE OF GIRLS EDUC ATION BOAGILE/CQS/RFP/022 / ENG AGEMENT OF CONSULTANCY SUPERVISION FIRM FOR VERI FICATION OF CONTRACTORS Creating Safe and Accessibl Consultant Qualifi Under Implement TECHNICAL INPUT AND CONS IDA / 67380 Post Limited 138,000.00 0.00 2022-09-01 2022-08-01 2022-09-13 2022-12-19 2022-09-15 2022-09-19 2023-09-19 e Learning Spaces cation Selection ation TRUCTION SUPERVISION OF 1 5 JUNIOR AND 10 SENIOR SE CONDARY SCHOOLS IN BORN O STATE UNDER THE AGILE P ROJECT IN NIGERIA (PACKAG E A AND B) BOAGILE/2022/038 / ENGAG EMENT OF CONSULTANCY FI Fostering an enabling enviro Consultant Qualifi IDA / 67380 Post Limited 584,000.00 0.00 Signed 2022-12-12 2022-12-15 2022-12-26 2022-03-21 2022-12-28 2022-04-25 2023-01-01 2024-01-01 RM TO DEVELOP DIGITAL SKI nment for girls cation Selection LLS IN A PACKAGE FOR BORN O AGILE Page 2 BOAGILE/2022/084 / ENGAG EMENT OF CONSULTANT TO CONDUCT A RESEARCH ON S Fostering an enabling enviro Consultant Qualifi IDA / 67380 Post Limited 140,000.00 0.00 Signed 2023-01-23 2023-01-23 2023-02-06 2023-01-17 2023-02-08 2023-01-20 2023-02-12 2023-05-13 UPPORT FOR ADOLESCENT GI nment for girls cation Selection RLS' IN FCV BORNO STATE O N THE INCLUSION OF GIRLS I N IDP CAMPS BOAGILE/2022/085 / ENGAG EMENT OF A FIRM FOR DATA Fostering an enabling enviro Consultant Qualifi Under Implement IDA / 67380 Post Limited 150,000.00 0.00 2023-01-31 2023-02-08 2023-02-14 2023-02-16 2023-02-20 2023-06-20 SCIENCE SURVEY FOR CCT 1s nment for girls cation Selection ation t AND 2nd COHORTS IN BOR NO STATE BOAGILE/2022/096 / Capacit y Buliding of 300 Principals of Project management and sy Consultant Qualifi Under Implement Senior Secondary Schools an IDA / 67380 Post Open - National 82,528.00 0.00 2023-05-14 2023-05-22 2023-05-21 2023-06-11 2023-06-14 2023-07-01 2023-08-30 stem strengthening cation Selection ation d Education Managers on Sch ool Management in Borno (3 Senatorial districts) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BOAGILE/CS/2021/022 / Gap Assessment Analysis (ICT faci Project management and sy Individual Consult lities, infrastructure, students IDA / 67380 Post Limited 15,000.00 0.00 Canceled 2022-05-02 2022-03-23 2022-05-07 2022-05-21 2022-05-25 2022-11-21 stem strengthening ant Selection and teachers in 40 pilot Seco ndary Schools at the state le vel. BOAGILE/CS/2021/033 / Eng Project management and sy Individual Consult agement of consultant to dev IDA / 67380 Post Limited 16,250.00 0.00 Completed 2022-05-16 2022-03-23 2022-05-21 2022-03-27 2022-05-28 2022-04-07 2022-06-01 2022-07-31 stem strengthening ant Selection elop State PIM Manual BOAGILE/CS/2021/030 / Rec ording of Radio and TV learn Project management and sy at home lessons on customis IDA / 67380 Post Direct Selection Direct 112,500.00 0.00 Canceled 2022-06-06 2022-06-13 2022-06-19 2022-08-18 stem strengthening ed 2,000 Android Memory ca rd (16G) and distribution to p ilot schools. BOAGILE/CS/2021/011 / Diss emination of key messages o Fostering an enabling enviro Individual Consult Pending Impleme n girls education by network IDA / 67380 Post Limited 25,000.00 0.00 2022-05-10 2022-05-24 2022-05-26 2022-05-30 2022-07-29 nment for girls ant Selection ntation providers and social media (f acebook live program and tw itter). BOAGILE/CS/2021/019 / Iden tification and training of 12 Master Trainers on facilitatio Project management and sy Individual Consult IDA / 67380 Post Limited 7,740.00 0.00 Canceled 2022-05-17 2022-03-23 2022-05-31 2022-06-02 2022-06-06 2022-07-06 n of safe space activities( 3 H stem strengthening ant Selection ealth,3 environmental/climat e,3 GBV and 3 life skill/empo werment subect matter speci alists) BOAGILE/TR/2021/025 / Con duct of ToT Training on Digit Project management and sy Individual Consult IDA / 67380 Post Direct 14,580.00 0.00 Canceled 2022-04-13 2022-03-23 2022-05-02 2022-05-04 2022-05-09 2022-08-07 al Literacy for 20 computer t stem strengthening ant Selection eachers from 40 selected Sec ondary Schools. BOAGILE/CS/033/022 / ENGA GEMENT OF TECHNICAL ASSI Creating Safe and Accessibl Individual Consult STANT FOR MONITORING OF IDA / 67380 Post Limited 47,000.00 0.00 Signed 2022-08-15 2022-08-01 2022-08-29 2022-09-01 2022-08-31 2022-10-20 2022-09-04 2022-11-03 e Learning Spaces ant Selection NEW CONSTRUCTION OF SCH OOLS, SIG AND GSP ACTIVITI ES BOAGILE/CS/034/022 / ENGA GEMENT OF CONSULTANT FO R DESIGN AND CUSTOMIZATI Creating Safe and Accessibl Individual Consult ON OF DATA BASE FOR INDIV IDA / 67380 Post Limited 12,500.00 0.00 Signed 2022-08-19 2023-05-22 2022-09-02 2022-06-23 2022-09-04 2022-07-12 2022-09-08 2022-10-08 e Learning Spaces ant Selection IDUAL CHILD TRACKING (ICT) , SBMC MONITORING, SCHOO L MANAGEMENT & OTHER RE LATED M&E DATA COLLECTIO N BOAGILE/2022/063 / ENGAG EMENT OF CONSULTANT FOR Project management and sy Individual Consult IDA / 67380 Post Limited 51,282.00 0.00 Signed 2022-10-25 2022-10-18 2022-11-08 2022-11-10 2022-11-10 2022-11-14 2022-11-14 2023-11-14 ENVIRONMENTAL AND SOCIA stem strengthening ant Selection L DEVELOPMENT TECHNICAL ASSISTANT BOAGILE/CS/2021/028 / ENG AGEMENT OF PARTNER TO P ROVIDE TECHNICAL SUPPORT Creating Safe and Accessibl IDA / 67380 Post Direct Selection Direct - National 220,000.00 0.00 Canceled 2022-07-25 2022-07-28 2022-07-29 2022-08-04 2023-08-04 FOR THE FACILITATION OF SA e Learning Spaces FE SPACES IN SELECTED SEC ONDARY SCHOOLS IN BORNO STATE BOAGILE/2022/048 / ENGAG EMENT OF PARTNER TO PRO VIDE TECHNICAL SUPPORT F Creating Safe and Accessibl IDA / 67380 Post Direct Selection Direct - National 333,378.00 0.00 Signed 2022-11-03 2022-11-16 2022-11-07 2022-10-17 2022-11-13 2023-11-13 OR THE FACILITATION OF SAF e Learning Spaces E SPACES IN SELECTED SECO NDARY SCHOOLS IN BORNO STATE BOAGILE/2022/082 / ENGAG Project management and sy Under Implement IDA / 67380 Post Direct Selection Direct - National 62,000.00 0.00 2023-01-12 2023-01-12 2023-01-15 2023-01-25 2024-01-25 EMENT OF PROCUREMENT C stem strengthening ation ONSULTANT Page 3 PROCUREMENT PLAN (Textual Part) Project information: São Tomé and Principe; STP Girls Empowerment and Quality Education for All Project; P169222 Project Implementation agency: Ministry of Education, with fiduciary functions to be carried by AFAP Date of the Procurement Plan: 15 June 2020 Period covered by this Procurement Plan: 15 June to 30 September 2020 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used – Not applicable. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not applicable. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is Not applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables. Other Relevant Procurement Information All Direct Contract will be prior reviewed during the first year of project’s implementation. At the end of that period, an assessment will be made to revise the requirement, if needed. PROCUREMENT Sao Tome and Principe : Girls Empowerment and Quality Education for All Project PLAN General Information Country: Sao Tome and Principe 2020-06-16 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169222 GPN Date: Project Name: Girls Empowerment and Quality Education for All Project Loan / Credit No: IDA / V3070, IDA / D7340, TF / B3318 Project Fiduciary and Administrative Agency Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Project Coordination, Monito 04/W/GEE/2020 / Rehabilitati Request for Quota Single Stage - One E 2021-04-0 IDA / V3070 ring and Evaluation, and Cap Post Open - National 30,000.00 27,416.49 Completed 2020-08-16 2020-10-11 2020-10-08 on of PCU office in the MEES tions nvelope 9 acity Building 20/G/GEE/2020 / Rehabilitati Empowering Girls through th on and construction of bathr e Acquisition of Life Skills an Single Stage - One E 2021-10-0 IDA / V3070 Post Request for Bids Open - National 1,600,000.00 0.00 Canceled 2020-12-21 2020-12-26 2021-02-06 2021-03-08 2021-04-12 ooms and water suplply in sc d the Promotion of a Safe Sc nvelope 9 hools hool Environment National Procure 48/W/GEE/2022 / Hiring a co Empowering Girls through th ment Document - nstruction company to build e Acquisition of Life Skills an Request for Quota Single Stage - One E 2023-01-2 IDA / D7340 Post Open - National 1 Envelope proce 47,539.74 52,420.20 Signed 2022-05-29 2022-07-24 2022-09-10 a room (medium-sized physic d the Promotion of a Safe Sc tions nvelope 0 ss (Non Bank-SPD al space for backstage int th hool Environment ) e MEES) National Procure 68/W/GEE/2022 / MECC War Empowering Girls through th ment Document - ehouse refurbishment works, e Acquisition of Life Skills an Request for Quota Single Stage - One E 2023-11-0 IDA / D7340 Post Limited 1 Envelope proce 15,498.73 0.00 Signed 2023-03-13 2022-12-09 2023-05-08 to archive the AALEEB AND A d the Promotion of a Safe Sc tions nvelope 4 ss (Non Bank-SPD ALEES assessment instrumen hool Environment ) ts 75/W/GEE/2023 / Hiring of a Civil Construction Company t Empowering Girls through th Request for Bids - o carry out the Construction e Acquisition of Life Skills an Single Stage - One E Small Works SPD Under Imple 2024-01-2 IDA / D7340 Post Request for Bids Open - National 1,831,758.37 0.00 2023-04-04 2023-04-12 2023-04-09 2023-05-21 2023-06-20 2023-07-25 and Rehabilitation of Bathroo d the Promotion of a Safe Sc nvelope (1 envelope proce mentation 1 ms and Improvements to the hool Environment ss) Infrastructures of Schools in São Tomé and Príncipe (1.1.2 ) 81/W/GEE/2023 / Hiring of a Civil Construction Company t o carry out the Construction Empowering Girls through th Request for Bids - and Rehabilitation of Bathroo e Acquisition of Life Skills an Single Stage - One E Small Works SPD Pending Imp 2024-06-0 IDA / D7340 Post Request for Bids Open - National 1,790,849.80 0.00 2023-08-22 2023-08-27 2023-10-08 2023-11-07 2023-12-12 ms and Improvements to the d the Promotion of a Safe Sc nvelope (1 envelope proce lementation 9 Infrastructures of Schools (Es hool Environment ss) c. Basica Leal Bouças, Esc. B as.Venêncio Pires, Esc. Bas. Secun. Guadalup)in São Tom é and Príncipe GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 03/G/GEE/2020 / Acquisition Project Coordination, Monito Request for Quota Single Stage - One E of officve furniture for PIU (Mi IDA / V3070 ring and Evaluation, and Cap Post Limited 3,000.00 4,322.05 Completed 2020-05-05 2020-11-16 2020-06-30 2020-12-15 2020-12-27 2021-06-18 tions nvelope nistry of Education) acity Building Project Coordination, Monito 14/G/GEE/2020 / Purchase of Request for Quota Single Stage - One E IDA / V3070 ring and Evaluation, and Cap Post Limited 10,000.00 5,035.30 Completed 2020-05-13 2020-04-21 2020-07-08 2020-07-10 2021-01-04 2020-08-13 ITC Equipments for DPIE tions nvelope acity Building Project Coordination, Monito 01/G/GEE/2020 / Axquisition Request for Quota Single Stage - One E IDA / V3070 ring and Evaluation, and Cap Post Open - National 50,000.00 60,391.62 Completed 2020-08-01 2020-09-26 2020-11-25 2021-03-25 2021-02-11 of two (2) vehicles tions nvelope acity Building 02/G/GEE/2020 / Purchase of Project Coordination, Monito ITC equipment (5 Desktops, Request for Quota Single Stage - One E IDA / V3070 ring and Evaluation, and Cap Post Limited 15,500.00 17,018.05 Completed 2020-08-29 2020-10-12 2020-10-24 2020-11-12 2021-04-22 2021-06-16 1 multifunction printer, 4 po tions nvelope acity Building wer stations, 2 laptops) for P CU 18/C/GEE/2020 / Editing and Empowering Girls through th Printing of communication m e Acquisition of Life Skills an Request for Quota Single Stage - One E IDA / V3070 Post Limited 50,000.00 0.00 Canceled 2021-02-15 2021-04-12 2021-10-09 aterials (tamps, logos, etc.) f d the Promotion of a Safe Sc tions nvelope or PEREQT hool Environment Project Coordination, Monito 01/G/GEE/2021 / Aquisição d Request for Quota Single Stage - One E IDA / V3070 ring and Evaluation, and Cap Post Limited 28,000.00 29,713.52 Completed 2021-01-24 2021-01-20 2021-03-21 2021-01-23 2021-09-17 2021-06-18 e 19 Computadores Portáteis tions nvelope acity Building 37/G/GEE/2021 / Acquisition of 40 Tablets and Technology Equipment (2 video-conferen Request for Quota Single Stage - One E IDA / D7340 Tackling Learning Poverty Post Limited 30,000.00 22,203.12 Completed 2022-01-03 2021-06-30 2022-02-28 2021-08-27 2022-08-27 2021-10-26 cing systems and 4 Laptops) tions nvelope to support the implementatio n of Basic Education classroo m observation (TEACH) 46/G/GEE/2022 / Acquisition Project Coordination, Monito and installation of Generator Request for Quota Single Stage - One E IDA / D7340 ring and Evaluation, and Cap Post Limited 31,252.85 22,593.03 Completed 2022-04-02 2022-03-16 2022-05-28 2022-07-06 2022-11-24 2022-08-24 and Electric Pump (including tions nvelope acity Building Construction of Generator Ho use). 44/G/GEE/2022 / Acquisition Project Coordination, Monito Request for Quota Single Stage - One E of Equipment and Furniture f IDA / D7340 ring and Evaluation, and Cap Post Limited 12,770.22 0.00 Canceled 2022-03-05 2022-03-01 2022-04-30 2022-10-27 tions nvelope or MEES acity Building Project Coordination, Monito 59/G/GEE/2022 / Purchasing Request for Quota Single Stage - One E IDA / D7340 ring and Evaluation, and Cap Post Limited 9,000.00 6,169.41 Completed 2022-07-05 2022-07-22 2022-08-30 2022-09-24 2023-02-26 2023-01-02 a UPS for AFAP tions nvelope acity Building Empowering Girls through th 63/G/GEE/2022 / Acquisition e Acquisition of Life Skills an Single Stage - One E of 5 off-road vehicles to supe IDA / D7340 Post Request for Bids Open - National 211,168.60 0.00 Signed 2022-09-21 2022-09-21 2022-09-26 2022-11-07 2022-11-03 2022-12-07 2022-11-15 2023-01-11 2023-07-10 d the Promotion of a Safe Sc nvelope rvise the Project's activities. hool Environment Page 1 49/G/GEE/2022 / Acquisition Empowering Girls through th of 4 vehicles to supervise the e Acquisition of Life Skills an Single Stage - One E IDA / D7340 Post Request for Bids Open - National 175,000.00 0.00 Canceled 2022-05-20 2022-05-25 2022-07-06 2022-08-05 2022-09-09 2023-03-08 works of Bathrooms in School d the Promotion of a Safe Sc nvelope s hool Environment Project Coordination, Monito 65/G/GEE/2022 / Supply of F Request for Quota Single Stage - One E IDA / D7340 ring and Evaluation, and Cap Post Limited 7,431.94 0.00 Completed 2022-11-27 2022-11-07 2023-01-22 2023-07-21 2023-04-04 urniture for MEES tions nvelope acity Building 66/G/GEE/2022 / Acquisition Project Coordination, Monito of equipment (CHARGER FOR Request for Quota Single Stage - One E IDA / D7340 ring and Evaluation, and Cap Post Limited 2,799.49 0.00 Signed 2022-11-30 2022-11-04 2023-01-25 2023-07-24 DIGITALCAMERA, AIR CONDIT tions nvelope acity Building IONING and PROJECTOR) for MEES 19/G/GEE/2020 / Design, edi Open - Internationa Single Stage - One E ting and printing of Teaching IDA / V3070 Tackling Learning Poverty Post Request for Bids 500,000.00 0.00 Canceled 2020-09-01 2020-09-06 2020-10-18 2020-11-17 2020-12-22 2021-06-20 l nvelope learning materials (TLMS) for Basic education 09/G/GEE/2020 / Editing and Contingency Emergency Res Request for Quota Single Stage - One E IDA / V3070 Post Open - National 70,000.00 0.00 Canceled 2023-01-04 2023-03-01 2023-08-28 printing of materials on COVI ponse Component (CERC) tions nvelope D19 17/G/GEE/2020 / Purchase of ITC equipments for schools (c Open - Internationa Single Stage - One E TF / B3318 Tackling Learning Poverty Post Request for Bids 700,000.00 0.00 Canceled 2022-06-29 2022-07-04 2022-08-15 2022-09-14 2022-10-19 2023-04-17 omputers,printers, tablets, la l nvelope ptops, power stations) (2.2.1) Empowering Girls through th 79/G/GEE/2023 / Providing e Acquisition of Life Skills an Request for Quota Single Stage - One E Under Imple menstrual management prod IDA / D7340 Post Limited 30,000.00 0.00 2023-06-17 2023-08-12 2024-02-08 d the Promotion of a Safe Sc tions nvelope mentation ucts/reusable pads (1.1.2) hool Environment NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 06/S/GEE/2020 / Updadte of Project Coordination, Monito Tompro for Eduication Projec IDA / V3070 ring and Evaluation, and Cap Post Direct Selection Direct 15,000.00 16,500.00 Completed 2020-05-29 2021-05-28 2020-06-03 2021-05-31 2020-07-08 2021-06-09 2021-01-04 2021-07-02 t acity Building 37/NC/GEE/2020 / Editing an Empowering Girls through th d printing of communication e Acquisition of Life Skills an Request for Quota Single Stage - One E IDA / V3070 Post Limited 40,000.00 4,088.74 Completed 2021-06-22 2021-09-10 2021-08-17 2021-11-03 2022-02-13 2021-12-02 materials (tamps, logos, etc.) d the Promotion of a Safe Sc tions nvelope for PEREQT hool Environment 18/S/GEE/2020 / Editing and Empowering Girls through th Printing of communication m e Acquisition of Life Skills an Request for Quota Single Stage - One E IDA / V3070 Post Open - National 50,000.00 0.00 Canceled 2021-03-15 2021-05-10 2021-11-06 aterials (tamps, logos, etc.) f d the Promotion of a Safe Sc tions nvelope or PEREQT hool Environment 05/G/GEE/220 / Internet Serv IDA / V3070 Tackling Learning Poverty Post Direct Selection Direct 20,000.00 0.00 Canceled 2020-07-31 2020-08-05 2020-09-09 2021-03-08 ice for MEES Empowering Girls through th 60/S/GEE/2022 / Provision of e Acquisition of Life Skills an services to MEES/PEREQT in t IDA / D7340 Post Direct Selection Direct - National 72,750.00 72,750.00 Signed 2022-08-30 2022-07-27 2022-09-04 2022-07-28 2022-10-09 2022-08-30 2023-04-07 d the Promotion of a Safe Sc he area of ​communication hool Environment Project Coordination, Monito 64/NC/GEE/2022 / TomPro S Direct - Internation IDA / V3070 ring and Evaluation, and Cap Post Direct Selection 10,000.00 0.00 Completed 2022-10-06 2022-09-27 2022-10-11 2022-10-06 2022-11-15 2023-05-14 2023-01-02 ystem Technical Support al acity Building Project Coordination, Monito 62/S/GEE/2022 / Provision of Request for Quota Single Stage - One E IDA / D7340 ring and Evaluation, and Cap Post Limited 2,538.79 0.00 Signed 2022-11-27 2022-11-04 2023-01-22 2023-07-21 Security Service for MEES tions nvelope acity Building CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 10/C/GEE/2020 / Capacity bu Project Coordination, Monito Consultant Qualifi Open - Internationa ilding activity on large scale IDA / V3070 ring and Evaluation, and Cap Post 80,000.00 0.00 Canceled 2020-09-14 2020-10-05 2020-11-18 2020-12-18 2021-01-22 2021-07-21 cation Selection l student learning assessment acity Building 27/C/GEE/2020 / TA to imple Quality And Cost- Open - Internationa ment the Professional develo IDA / V3070 Tackling Learning Poverty Post 350,000.00 0.00 Canceled 2021-01-28 2021-02-18 2021-04-03 2021-05-01 2021-05-31 2021-07-05 2021-08-09 2022-08-09 Based Selection l pment program for pre-schoo l teachers 26/C/GEE/2020 / TA to condu ct large-scale students learni Quality And Cost- Open - Internationa IDA / V3070 Tackling Learning Poverty Post 300,000.00 0.00 Canceled 2021-04-22 2021-02-11 2021-05-13 2021-02-18 2021-06-26 2021-07-24 2021-08-23 2021-09-27 2021-11-01 2022-11-01 ng assessment in primary an Based Selection l d secondarybschools (ALLEB and ALLES) 42/C/GEE/2022 / Selection a nd contracting of a Consultan Empowering Girls through th cy Office/Company to develo e Acquisition of Life Skills an Consultant Qualifi IDA / V3070 Post Open - National 79,296.00 30,764.97 Completed 2022-01-26 2022-01-17 2022-02-16 2022-01-24 2022-04-01 2022-04-05 2022-05-01 2022-05-09 2022-06-05 2022-06-04 2022-12-02 2023-02-26 p architectural and structural d the Promotion of a Safe Sc cation Selection projects for the construction hool Environment and rehabilitation of bathroo ms in schools 45/C/GEE/2022 / Hiring a co Project Coordination, Monito Consultant Qualifi mpany to teach the English c IDA / D7340 ring and Evaluation, and Cap Post Open - National 24,000.00 24,773.57 Signed 2022-03-30 2022-03-14 2022-04-20 2022-06-03 2022-06-06 2022-07-03 2022-08-08 2022-08-07 2022-08-30 2023-02-03 cation Selection ourse for MEES´s Technicians acity Building . Empowering Girls through th 29/C/GEE/2020 / TA to imple e Acquisition of Life Skills an Quality And Cost- Open - Internationa ment the Girls' Empweremen IDA / V3070 Post 220,000.00 0.00 Canceled 2021-01-04 2021-01-25 2021-03-10 2021-04-07 2021-05-07 2021-06-11 2021-07-16 2022-07-16 d the Promotion of a Safe Sc Based Selection l t Program hool Environment 28/C/GEE/2020 / TA to imple ment the Professional Develo Quality And Cost- Open - Internationa Under Implement pment Program for Elementa IDA / D7340 Tackling Learning Poverty Prior 1,840,000.00 0.00 2022-06-30 2022-11-21 2022-07-21 2023-04-25 2022-09-03 2022-10-01 2022-10-31 2022-12-05 2023-01-09 2024-01-09 Based Selection l ation ry School Teachers (Elaborati on of Structured Materials) Page 2 53/C/GEE/2022 / T.A to prom Project Coordination, Monito ote Inclusive Education that r Consultant Qualifi Open - Internationa Pending Impleme IDA / D7340 ring and Evaluation, and Cap Post 145,000.00 0.00 2022-06-30 2022-07-21 2022-09-03 2022-10-03 2022-11-07 2023-05-06 esponds to the challenges of cation Selection l ntation acity Building the Framework Law 55/C/GEE/2022 / Project com Project Coordination, Monito Consultant Qualifi munication strategy (Educati IDA / D7340 ring and Evaluation, and Cap Post Open - National 52,500.00 0.00 Canceled 2022-06-24 2022-07-15 2022-08-28 2022-09-27 2022-11-01 2023-04-30 cation Selection on Strengthening, Inclusive E acity Building ducation) 61/C/GEE/2022 / PREPARATI Project Coordination, Monito Consultant Qualifi Open - Internationa ON OF ENVIRONMENTAL AND IDA / D7340 ring and Evaluation, and Cap Post 35,843.00 0.00 Signed 2022-08-30 2022-07-20 2022-09-20 2022-08-02 2022-11-03 2022-11-11 2022-12-03 2023-03-09 2023-01-07 2023-07-06 cation Selection l SOCIAL MANAGEMENT PLANS acity Building (ESMP) 69/C/GEE/2022 / Technical A ssistance to develop process Empowering Girls through th es and actions that promote e Acquisition of Life Skills an Consultant Qualifi Open - Internationa Under Implement a more sustainable, safe and IDA / D7340 Post 65,127.00 0.00 2023-01-10 2022-12-19 2023-01-31 2022-12-22 2023-03-16 2023-03-30 2023-04-15 2023-05-20 2023-11-16 d the Promotion of a Safe Sc cation Selection l ation inclusive school environment hool Environment , as well as strategies for adv ocacy and behavior change i n schools in STP (Wash) 70/C/GEE/2022 / T.A TO STR ENGTHEN THE IMPLEMENTAT Project Coordination, Monito Quality And Cost- Open - Internationa Pending Impleme ION OF THE DEVELOPMENT S TF / B3318 ring and Evaluation, and Cap Post 291,852.00 0.00 2023-07-25 2023-08-15 2023-09-28 2023-10-26 2023-11-25 2023-12-30 2024-02-03 2025-02-02 Based Selection l ntation TRATEGY FOR SPECIAL EDUC acity Building ATION IN SÃO TOMÉ AND PRÍ NCIPE. 71/C/GEE/2023 / Hiring an in stitution to revise the Teache rs' Management Policy in São Quality And Cost- Open - Internationa Under Implement IDA / D7340 Tackling Learning Poverty Post 460,000.00 0.00 2023-08-22 2023-03-17 2023-09-12 2023-03-20 2023-10-26 2023-11-23 2023-12-23 2024-01-27 2024-03-02 2025-03-02 Tomé and Príncipe and carry Based Selection l ation out training, certification in s chool leadership for manager s and supervisors. 72/C/GEE/2023 / Hiring a Offi Empowering Girls through th ce/Company to supervise the e Acquisition of Life Skills an Consultant Qualifi Under Implement TF / B3318 Post Open - National 213,578.27 0.00 2023-10-24 2023-04-12 2023-11-14 2023-12-28 2024-01-27 2024-03-02 2024-08-29 Works of Construction and R d the Promotion of a Safe Sc cation Selection ation ehabilitation of Bathrooms in hool Environment Schools (1.1.2) 23/C/GEE/2020 / Technical A Quality And Cost- Open - Internationa Pending Impleme ssistance for implementation TF / B3318 Tackling Learning Poverty Post 210,000.00 0.00 2023-06-21 2023-07-12 2023-08-25 2023-09-22 2023-10-22 2023-11-26 2023-12-31 2024-12-30 Based Selection l ntation of the accelerated Education Program (3.3.1) 74/C/GEE/2023 / Hiring a TA to develop an integrated tec hnological system that make Reaching the Most Vulnerabl Consultant Qualifi Pending Impleme IDA / D7340 Post Open - National 80,000.00 0.00 2023-11-29 2023-12-20 2024-02-02 2024-03-03 2024-04-07 2024-10-04 s it possible to cross-referenc e cation Selection ntation e the database of both sector s (MECC and Social Protectio n) (3.3.3) 54/C/GEE/2022 / Hiring a co Project Coordination, Monito Consultant Qualifi Open - Internationa Pending Impleme nsultancy to update the Scho IDA / D7340 ring and Evaluation, and Cap Post 50,000.00 0.00 2023-09-27 2023-10-18 2023-12-01 2023-12-31 2024-02-04 2024-08-02 cation Selection l ntation ol Charter (4.4.2) acity Building 78/C/GEE/2023 / STRENGTH EN THE CAPACITY OF PUBLIC Empowering Girls through th SCHOOLS AND GIRLS, ESPECI e Acquisition of Life Skills an Quality And Cost- Open - Internationa Under Implement IDA / D7340 Post 252,303.00 0.00 2023-05-23 2023-05-23 2023-06-13 2023-05-23 2023-07-27 2023-08-24 2023-09-23 2023-10-28 2023-12-02 2024-12-01 ALLY THE MOST VULNERABLE d the Promotion of a Safe Sc Based Selection l ation , TO MANAGE MENSTRUATIO hool Environment N WITH DIGNITY AND IN A SA FE ENVIRONMENT (1.1.2) 22/C/GEE/2020 / Adaptation Project Coordination, Monito Consultant Qualifi Open - Internationa and supervision of data colle IDA / D7340 ring and Evaluation, and Cap Post 140,000.00 0.00 Canceled 2022-11-29 2022-11-14 2022-12-20 2022-11-15 2023-02-02 2023-02-20 2023-03-04 2023-04-08 2023-10-05 cation Selection l ction to baseline using MELQ acity Building O INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 11/C/GEE/2020 / Technical a Project Coordination, Monito ssistance to elaborate the En Individual Consult IDA / V3070 ring and Evaluation, and Cap Post Open 40,000.00 0.00 Canceled 2020-07-19 2020-09-06 2020-09-27 2020-11-01 2021-04-30 vironmental and Social Fram ant Selection acity Building ework instruments 13/C/GEE/2020 / Technical a Project Coordination, Monito ssistance for training and for Individual Consult IDA / V3070 ring and Evaluation, and Cap Post Open 40,000.00 0.00 Canceled 2020-06-26 2020-08-14 2020-09-04 2020-10-09 2021-04-07 providing specialized support ant Selection acity Building to the statics staff 08/CGEE/2020 / Hiring Envir Project Coordination, Monito Individual Consult onmental and Social Develop IDA / V3070 ring and Evaluation, and Cap Post Open 32,000.00 39,150.00 Signed 2020-05-14 2020-12-04 2020-07-02 2021-03-05 2020-07-23 2021-03-24 2020-08-27 2021-04-02 2021-02-23 ant Selection ment specialist for PIU (MEES acity Building ) 07/C/GEE/2020 / Hiring Moni Project Coordination, Monito Individual Consult toring and Evaluation speciali IDA / V3070 ring and Evaluation, and Cap Post Open 32,000.00 0.00 Canceled 2020-07-13 2020-07-10 2020-08-31 2020-08-06 2020-09-21 2020-10-26 2021-04-24 ant Selection st acity Building Project Coordination, Monito 15/C/GEE/2020 / Hiring a Pro Individual Consult IDA / V3070 ring and Evaluation, and Cap Post Open 100,000.00 0.00 Canceled 2020-06-30 2020-07-06 2020-08-18 2020-09-10 2020-09-08 2020-10-13 2021-04-11 ject Management Expert ant Selection acity Building Empowering Girls through th 16/C/GEE/2020 / Hiring a Co e Acquisition of Life Skills an Individual Consult IDA / V3070 Post Open 35,000.00 0.00 Canceled 2020-07-03 2020-07-10 2020-08-21 2020-09-11 2020-10-16 2021-04-14 ordinator for PCU d the Promotion of a Safe Sc ant Selection hool Environment 24/C/GEE/2020 / TA to imple Reaching the Most Vulnerabl Individual Consult Pending Impleme ment an Early warning syste IDA / V3070 Post Open 199,000.00 0.00 2020-12-16 2021-02-03 2021-02-24 2021-03-31 2021-09-27 e ant Selection ntation m to signal students in learn dificulties 30/C/GEE/2020 / Technical a Project Coordination, Monito ssistance to elaborate the en IDA / V3070 ring and Evaluation, and Cap Post Direct Selection Direct 40,000.00 15,000.00 Completed 2020-08-14 2020-08-14 2020-08-24 2020-08-10 2020-10-28 2020-09-01 2021-04-26 2021-12-18 vironmental &Social framewo acity Building rk instruments Empowering Girls through th 31/C/GEE/2020 / Hiring Moni e Acquisition of Life Skills an Individual Consult toring and Evaluation speciali IDA / V3070 Post Open 32,000.00 68,232.60 Signed 2020-10-08 2020-09-30 2020-11-26 2020-11-04 2020-12-17 2020-11-17 2021-01-21 2020-12-02 2021-07-20 d the Promotion of a Safe Sc ant Selection st hool Environment Page 3 Empowering Girls through th 32/C/GEE/2020 / Hiring a Co e Acquisition of Life Skills an Individual Consult IDA / V3070 Post Open 35,000.00 16,200.00 Signed 2020-10-08 2020-09-29 2020-11-26 2020-11-27 2020-12-17 2020-11-30 2021-01-21 2020-12-02 2021-07-20 ordinator for PCU d the Promotion of a Safe Sc ant Selection hool Environment Empowering Girls through th 33/C/GEE/2020 / Hiring a Pro e Acquisition of Life Skills an Individual Consult IDA / V3070 Post Open 100,000.00 93,176.52 Completed 2020-10-13 2020-09-30 2020-12-01 2020-11-17 2020-12-22 2020-11-24 2021-01-26 2020-12-02 2021-07-25 2021-11-27 ject Management Expert d the Promotion of a Safe Sc ant Selection hool Environment Empowering Girls through th 36/C/GEE/2020 / Design of c e Acquisition of Life Skills an Individual Consult ommunication materials (ta IDA / V3070 Post Limited 10,000.00 13,750.00 Completed 2021-04-05 2021-03-18 2021-04-10 2021-03-22 2021-05-01 2021-05-17 2021-06-05 2021-05-22 2021-12-02 2021-11-09 d the Promotion of a Safe Sc ant Selection mps, logos, etc.) for PEREQT hool Environment 35/C/GEE/2020 / TA to condu ct Large-Scale Students Lear IDA / D7340 Tackling Learning Poverty Prior Direct Selection Direct 300,000.00 327,424.09 Signed 2021-03-31 2021-03-29 2021-04-10 2021-03-30 2021-06-14 2022-01-19 2021-12-11 ning Assessment in Primary a nd Secondarybschools (AALE B AND AALES) 34/C/GEE/2020 / Techical As sistance to conduct the Lear IDA / D7340 Tackling Learning Poverty Prior Direct Selection Direct 290,000.00 141,459.43 Signed 2021-03-31 2021-03-30 2021-04-10 2021-04-15 2021-06-14 2021-12-03 2021-12-11 ning Assessment PASEC Empowering Girls through th 08/C/GEE/2021 / Hiring a Co e Acquisition of Life Skills an Individual Consult IDA / V3070 Post Open 32,000.00 45,000.00 Signed 2021-06-10 2021-06-07 2021-07-29 2021-08-06 2021-08-19 2021-08-19 2021-09-23 2021-08-31 2022-03-22 ordinator for PCU d the Promotion of a Safe Sc ant Selection hool Environment Empowering Girls through th 09/C/GEE/2021 / Hiring Civil e Acquisition of Life Skills an Individual Consult IDA / D7340 Post Open 26,400.00 0.00 Canceled 2021-09-28 2021-06-09 2021-11-16 2021-12-07 2022-01-11 2022-07-10 Construction Engineer d the Promotion of a Safe Sc ant Selection hool Environment Empowering Girls through th 38/C/GEE/2021 / Hiring a Civ e Acquisition of Life Skills an Individual Consult IDA / D7340 Post Open 33,840.00 48,600.00 Signed 2021-07-28 2021-06-23 2021-09-15 2021-09-29 2021-10-06 2021-10-06 2021-11-10 2021-10-10 2022-05-09 il Construction Engineer d the Promotion of a Safe Sc ant Selection hool Environment 39/C/GEE/2021 / TECHNICAL ASSISTANCE FOR TRAINING A Individual Consult ND SUPPORT IN DATA ANALY IDA / D7340 Tackling Learning Poverty Post Open 42,500.00 0.00 Canceled 2021-09-22 2021-06-23 2021-11-10 2021-12-01 2022-01-05 2022-07-04 ant Selection SIS FOR THE STATISTICS AND EDUCATIONAL EVALUATION T EAM 40/C/GEE/2021 / Hiring an in Project Coordination, Monito Individual Consult dividual consultant to survey IDA / D7340 ring and Evaluation, and Cap Post Limited 2,500.00 2,500.00 Completed 2021-09-22 2021-09-08 2021-09-27 2021-09-10 2021-10-18 2021-10-18 2021-11-22 2021-10-20 2022-05-21 2021-12-07 ant Selection the conditions of the MEES el acity Building ectrical system 41/C/GEE/2021 / TA FOR TRA INING PRESCHOOL EDUCATIO N TEACHERS, CONCEPTION, IDA / V3070 Tackling Learning Poverty Post Direct Selection Direct 1,151,003.00 1,151,003.00 Signed 2021-12-20 2021-12-17 2021-12-30 2021-12-20 2022-03-05 2022-01-29 2022-09-01 CONSTRUCTION AND ACQUIS ITION OF SUPPORT MATERIAL S FOR THE TEACHING AND LE ARNING OF CHILDREN 43/C/GEE/2022 / TECHNICAL ASSISTANCE FOR TRAINING A ND SUPPORT IN DATA ANALY Individual Consult IDA / D7340 Tackling Learning Poverty Post Open 78,200.00 75,167.84 Signed 2022-01-26 2022-01-17 2022-03-16 2022-04-27 2022-04-06 2022-06-13 2022-05-11 2022-07-10 2022-11-07 SIS FOR THE EDUCATIONAL S ant Selection TATISTICS AND EVALUATION TEAM IN SAO TOME AND PRI NCIPE Empowering Girls through th 56/C/GEE/2022 / Financial M e Acquisition of Life Skills an Individual Consult IDA / D7340 Post Direct 45,627.24 45,627.24 Signed 2022-04-18 2022-05-19 2022-04-28 2022-06-13 2022-05-19 2022-06-14 2022-06-23 2022-06-25 2022-12-20 anager for AFAP d the Promotion of a Safe Sc ant Selection hool Environment Empowering Girls through th 58/C/GEE/2022 / Senior Acco e Acquisition of Life Skills an Individual Consult IDA / D7340 Post Direct 32,340.00 32,340.00 Signed 2022-04-18 2022-05-19 2022-04-28 2022-06-13 2022-05-19 2022-06-14 2022-06-23 2022-06-25 2022-12-20 untant for AFAP d the Promotion of a Safe Sc ant Selection hool Environment Empowering Girls through th 57/C/GEE/2022 / Specialist i e Acquisition of Life Skills an Individual Consult n Environmental and Social S IDA / D7340 Post Direct 44,465.76 0.00 Under Review 2022-04-18 2022-05-20 2022-04-28 2022-05-19 2022-06-23 2022-12-20 d the Promotion of a Safe Sc ant Selection afeguards for AFAP hool Environment Empowering Girls through th 47/C/GEE/2022 / TA to imple e Acquisition of Life Skills an ment the Girls' Empweremen IDA / D7340 Post Direct Selection Direct 761,584.00 726,207.00 Signed 2022-06-28 2022-05-10 2022-07-08 2022-05-19 2022-09-11 2022-06-03 2023-03-10 d the Promotion of a Safe Sc t Program hool Environment Project Coordination, Monito 67/C/GEE/2022 / Project Audi Direct - Internation Pending Impleme TF / B3318 ring and Evaluation, and Cap Post Direct Selection 19,000.00 0.00 2022-11-11 2022-11-21 2023-01-25 2023-07-24 t al ntation acity Building Project Coordination, Monito 76/C/GEE/2023 / Hiring a GB Individual Consult IDA / D7340 ring and Evaluation, and Cap Post Limited 32,000.00 0.00 Canceled 2023-04-05 2023-04-10 2023-05-01 2023-06-05 2023-12-02 V specialist (4.4.1) ant Selection acity Building Project Coordination, Monito 77/C/GEE/2023 / Hiring a GB IDA / D7340 ring and Evaluation, and Cap Post Direct Selection Direct - National 32,000.00 0.00 Signed 2023-05-10 2023-05-02 2023-05-20 2023-05-03 2023-07-24 2024-01-20 V specialist (4.4.1) acity Building 80/C/GEE/2023 / Data Cente Project Coordination, Monito r Design and Specifications f Individual Consult Under Implement TF / B3318 ring and Evaluation, and Cap Post Limited 5,000.00 0.00 2023-06-13 2023-06-01 2023-06-18 2023-07-09 2023-08-13 2024-02-09 or Ministry of Education of Sa ant Selection ation acity Building o Tome and Principe Page 4 18 MONTHS PROCURMENT PLAN Project information: Liberia, COVID- 19 Emergency Response Project (P173812) Project Implementation agency: Ministry of Health Date of the Procurement Plan: March 2020 Period covered by this Procurement Plan: April 2020 – October 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Concessions Act, 2010 of the Republic of Liberia, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. In accordance with paragraph 5.3 of the Procurement Regulations, the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. Other Relevant Procurement Information:- (a). Prior Procurement Arrangements: The Procurement Arrangements as indicated in the below table and within the thresholds indicated in the below tables will be used. The thresholds for the Bank’s prior review requirements are also provided in the table below: Table: Thresholds, Procurement Arrangements, and Prior Review (The table below depicts the Thresholds and Procurement Methods to be used under the Liberia COVID-19 Emergency Response project): Thresholds, Procurement Methods, and Prior Review Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] All contracts at or above USD Open Competition 5,000,000 are subject to International Market international advertising and 1 Works C ≥ 5,000,000 Approach and Direct the use of the Bank’s SPDs (or Contracting other documents agreed with the Bank). Contract (C) Value Expenditure Procurement Contracts Subject to No Threshold* [eq. Category Method Prior Review /[eq. US$] USD] Open Competition National Market 200,000 < C < 5,000,000 None Approach C ≤ 200,000 RFQ None All contracts at or above USD Open Competition 500,000 are subject to International Market international advertising and C ≥ 500,000 Approach and Direct the use of the Bank’s SPDs (or Goods, IT and Contracting other documents agreed with 2 non-consulting the Bank). services Open Competition : National Market None 100,000 < C < 500,000 Approach C ≤ 100,000 RFQ None All contracts at or above USD 100,000 are subject to for international advertising and C < 100,000 Consulting Services the use of the Bank’s SPDs (or other documents agreed with National the Bank). shortlist for 3 selection of All contracts at or above USD consultant firms for 200,000 are subject to Engineering and international advertising and C ≤ 200,000 Construction the use of the Bank’s SPDs (or Supervision other documents agreed with the Bank). Selection of All values ≥ 100,000 4 Individual All Approaches consultants (Special procurement arrangements like direct contracting, use of SOEs, UN Agencies, third party monitors, local NGOs, Force Account, servants needs, results based arrangements. It is not expected that there will need for prequalification in the procurement arrangements under Liberia COVID -19 EMERGENCY RESPONSE These thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re- assessment of risks. All contracts not subject to prior review will be post- reviewed. Prequalification. Not expected for the packages of works/goods packages in the procurement plan. Proposed Procedures for CDD Components: Not Applicable Reference to (if any) Project Operational/Procurement Manual: the Liberia COVID-19 Emergency Response team will prepare Procurement Implementation Manual. Procurement processes will be captured in summary form in the Project Implementation Manual. Any Other Special Procurement Arrangements: qualifying procurement activities will consider making use of the Bank’s HEIS. Additionally, we will also tap into regional pool procurement involving the UN agencies and others that qualified with Bank’s guidance. Procurement Packages/PLAN with Procurement Arrangements and Time Schedule: as per the Table below: PROCUREMENT PLAN Goods and Non Consulting Services 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procur Preq Nation Revie Expecte Expect Comme No. ement ualifi al w d bid ed nts (Description) Cost Method catio Prefer opening Contra n ence by date ct US$ Bank (yes/ (yes/n Signat million no) o) ure (Prior Date / Post) 1. Procurement of RFQ, No No Post TBA TBA logistic 540,000. Limited , equipment 00 Nation including al motorcycles (80 NPHIL & 20 MOA, 20 Laboratory Services) 2. Procurement of RFQ, No No Post TBA TBA vehicles to 480,000. Limited , teams 00 Nation movement and al support sample transport (3 regional sample, 3 M&E and 2 NRL) 3. Procurement of UNOPS, No No Post TBA TBA 10 ambulances 600,000. DIR, 00 4. Procure UNICEF No No Post TBA TBA additional 110,000. , DIR, COVID-19 00 Laboratory supplies: Reagents for 1000000 test run. (test diagnosis and test to confirm negative for release (2 per critical+ Severe)- 1500 5. Procurement of UNICEF, No No Post TBA TBA Medical DIR equipment & 1,764,16 Supplies under 7.77 Case Mang. Lot:1- Medical Equipment- moyo fetal heart rate monitor, oxygen concentrator with voltage stabilizer etc Lot:2 - Medical Supplies _ Hospital beds sets- 600, ICU bed sets- 600 etc 6. Procurement of UNICEF No No Post TBA TBA Gene-Xpert 148,213. , DIR Supplies 00 7. Print and RFQ, No No Post TBA TBA disseminate 75,000.0 Limited , Preparedness 0 Nation update and al Response Sitrep, response progress report and AAR reports 8. Production of RFQ, No No Post TBA TBA response 5,000.00 Limited , identifcation Nation (Stickers, al tag/pass Works 1 2 3 4 5 6 7 8 9 Ref. Contract Estimated Procur Preq Nation Revie Expecte Expect Comment No. ement ualifi al w d bid ed s (Description) Cost Method catio Prefer opening Contra / n ence by date ct US$ million Bank Arrang (yes/ (yes/n Signat ement no) o) ure (Prior Date / Post) 1. Cost to DIR, No No Post TBA TBA . upgrade 25,000.00 Nation operating al theatre 2. Rehabilitate DIR, No No Post TBA TBA Isolation 40,194.23 Nation facility/hospital al 3. Support to DIR, No No Post TBA TBA rehabilitated 800,000.0 Nation National COVID-19 al Isolation and 0 treatment facility (star-base); and treatment facility (14 Military 4. Building and RFQ, No No Post TBA TBA operations of 2-IV 250,000.0 Limited Fluid plant , 0 Nation al 5. Installation of 2- RFQ, No No Post TBA TBA oxygen plant 250,000.0 Limited 0 Nation al Consultancy Services 1 2 3 4 5 6 7 7 Ref. Description of Estimat Revie Expected Expected No. Assignment ed Selectio w date of n proposal Contract Comments Signature Cost Method/ by submissi Arrange Bank on US$ Date ment (Prior / Post) 1. Procurement Officer Limited, Post n/a TBA 24,000. Individua l 00 Consulta nt 2. Project Officer Limited, Post n/a TBA (COVID_19) 24,000. Individua l 00 Consulta nt 3. M&E Specialist - Limited, Post n/a TBA (COVID_19) 24,000. Individua l 00 Consulta nt 4. Communication Limited, Post n/a TBA Specialist (COVID_19) 24,000. Individua l 00 Consulta nt 5. Office Cleaners 21600.0 Limited, Post n/a TBA (COVID_19) – 6 persons 0 Individua l Consulta nt 6. Drivers (COVID_19) – 5 Limited, Post n/a TBA persons 18,000. Individua l 00 Consulta nt GENERAL NOTES 1. Operational Costs: These are expected expenditures to be incurred by the Recipient to finance: (i) the salaries of locally contracted support staff of the Project entities and units involved in Project implementation (excluding civil servants) and state contributions thereon; (ii) per diem and travel expenses of the operational staff performing their responsibilities under the Project; (iii) fuel and vehicle maintenance and insurance; (iv) communication technology (including, without limitation, internet and telephone) and maintenance of equipment; (v) rental expenses and utilities; (vi) building security and maintenance; (vii) translations services, photocopies and publications; (viii) bank commissions; and (ix) utilities and office supplies as defined in the FA. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub- consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;2 (ii) to be a nominated3 sub- contractor, consultant, manufacturer or supplier, or service provider of 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: Title of the person signing the Letter: PROCUREMENT Liberia : Liberia COVID-19 Emergency Response Project PLAN General Information Country: Liberia 2020-04-28 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173812 GPN Date: 2020-10-27 Project Name: Liberia COVID-19 Emergency Response Project Loan / Credit No: IDA / 66090, IDA / D9000, TF / B6141, IDA / D6080 Ministry of Health and Social Welfare Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned LR-MOHSW-171813-CW-RFQ / Rehabiliation and upgrading Component 3: Case Manage Request for Quota Single Stage - One E 2020-12-3 IDA / 66090 Post Limited 447,679.09 423,776.09 Completed 2020-05-09 2020-05-05 2020-07-04 2020-06-10 of Jordanian Hospital at Star- ment and Clinical Care tions nvelope 1 Base as Isolation and or Trea tment Center LR-MOHSW-171816-CW-RFQ / Rehabiliation work at 14 Mili Component 3: Case Manage Request for Quota Single Stage - One E 2020-12-3 tary Hosital to improve the s IDA / 66090 Post Limited 178,486.78 167,378.33 Completed 2020-05-09 2020-05-05 2020-07-04 2020-06-11 ment and Clinical Care tions nvelope 1 urrounding, staff safety while providing quality care and av oid infection. LR-MOHSW-187507-CW-RFQ / Rehabilitation works for UNI ON COVID-19 Treatment Cen Component 3: Case Manage Request for Quota Single Stage - One E Pending Imp 2021-04-0 IDA / 66090 Post Limited 6,578.00 0.00 2020-08-15 2020-10-10 ter in Monrovia to include sh ment and Clinical Care tions nvelope lementation 8 elter to complete donning sit e, shower and toilet for use b y medical staff etc. LR-MOHSW-187508-CW-RFQ / Rehabilitation works for Bon g County COVID-19 treatmen Component 3: Case Manage Request for Quota Single Stage - One E Under Imple 2021-04-0 t site located at Phebe Hospit IDA / 66090 Post Limited 5,995.00 0.00 2020-08-15 2020-10-09 2020-10-10 ment and Clinical Care tions nvelope mentation 8 al Compound. To enhance pa tient care and increase the n umber of bed space thus red ucing the frequent referral to Monrovia. LR-MOHSW-302146-CW-RFQ Request for Quota / Purchase of building materi Component 1: Emergency Pr Request for Quota Single Stage - One E Pending Imp 2022-12-0 IDA / 66090 Post Limited tions (Non Bank-S 6,007.58 0.00 2022-07-09 2022-09-03 al for the construction of a ge eparedness Response tions nvelope lementation 2 PD) nerator platform/shelter for t he One Health Building LR-MOHSW-308797-CW-RFQ / Procurement for the constru ction of incinerator and Chain Request for Quota Component 1: Emergency Pr Request for Quota Single Stage - One E 2023-04-1 -linked Fence around the was IDA / 66090 Post Limited tions (Non Bank-S 60,009.32 0.00 Signed 2022-08-21 2022-08-31 2022-10-16 eparedness Response tions nvelope 4 te management center at th PD) e National Reference Laborat ory, Charlesville, Margibi Cou nty. LR-MOHSW-317724-CW-RFQ / Construction of platform an Request for Quota d canopy for the installation Component 1: Emergency Pr Request for Quota Single Stage - One E Under Imple 2023-05-2 IDA / 66090 Post Limited tions (Non Bank-S 70,000.00 0.00 2022-10-02 2022-09-27 2022-11-27 of Mobile Containerized Oxyg eparedness Response tions nvelope mentation 6 PD) en Plant to be built at JFK Ho spital, 20th Street, Sinkor Mo nrovia, Liberia LR-MOHSW-317748-CW-RFQ / Construction of platform an Request for Quota d Canopy for the installation Component 1: Emergency Pr Request for Quota Single Stage - One E Under Imple 2023-05-2 IDA / 66090 Post Limited tions (Non Bank-S 70,000.00 0.00 2022-10-02 2022-09-27 2022-11-27 of Mobile Containerized Oxyg eparedness Response tions nvelope mentation 6 PD) en Plant to be built at the Lib eria Government Hospital, Bu chana Grand Bassa County LR-MOHSW-366920-CW-RFB / Procurement for the rehabili Request for Bids - ation of the Jordanian hospita Component 1: Emergency Pr Single Stage - One E Small Works SPD Under Imple 2024-06-0 IDA / D6080 Post Request for Bids Open - National 537,551.48 0.00 2023-06-20 2023-06-21 2023-06-25 2023-06-21 2023-08-06 2023-09-05 2023-10-10 l faciliate for use as an infecti eparedness Response nvelope (1 envelope proce mentation 6 ous disease hospital at Star B ss) ase, Bushrod Island, Monrovi a, Liberia GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-171285-GO-RFQ Component 1: Emergency Pr Request for Quota Single Stage - One E / Purchase of 74 pieces of Mo IDA / 66090 Post Limited 320,000.00 310,060.00 Completed 2020-03-31 2020-04-04 2020-05-26 2020-03-10 2020-11-22 2020-05-20 eparedness Response tions nvelope torcycles for Used by NPHIL a nd MOA LR-MOHSW-171284-GO-RFQ Component 1: Emergency Pr Request for Quota Single Stage - One E / Purchase of 46 pieces Motor IDA / 66090 Post Limited 160,000.00 156,400.00 Completed 2020-03-31 2020-04-04 2020-05-26 2020-05-01 2020-11-22 2020-06-17 eparedness Response tions nvelope cycles for Used by NPHIL and MOA LR-MOHSW-171287-GO-RFQ Component 1: Emergency Pr Request for Quota Single Stage - One E / Purchase of Assorted Vehicl IDA / 66090 Post Limited 480,000.00 368,702.00 Completed 2020-03-31 2020-04-20 2020-05-26 2020-05-16 2020-11-22 2020-08-06 eparedness Response tions nvelope es for COVID-19 Operations LR-MOHSW-171286-GO-UN / Component 1: Emergency Pr UN Agencies (Dire Purchase of ten Ambulance f IDA / 66090 Post Direct 532,649.10 870,222.00 Completed 2020-03-23 2020-04-04 2020-03-28 2020-04-22 2020-05-02 2020-04-30 2020-10-29 2020-06-18 eparedness Response ct) or COVID Operations LR-MOHSW-171859-GO-RFQ Component 3: Case Manage Request for Quota Single Stage - One E / Purchase of 20 units of Vent IDA / 66090 Post Limited 700,000.00 699,500.00 Completed 2020-05-02 2020-05-05 2020-06-27 2020-05-30 2020-12-24 2020-07-24 ment and Clinical Care tions nvelope ilators for COVID-19 Respons e LR-MOHSW-176432-GO-RFQ / Purchase of assorted medic al supplies and equipment to Component 3: Case Manage Request for Quota Single Stage - One E IDA / 66090 Post Limited 630,000.00 449,923.00 Signed 2020-06-07 2020-06-12 2020-08-02 2020-09-30 2020-10-31 include ICU and regular hospi ment and Clinical Care tions nvelope tal beds and 30 units patient monitors for support to case management. Page 1 LR-MOHSW-178196-GO-UN / Purchase of Assorted medical Component 3: Case Manage UN Agencies (Dire Equipment, Supplies and Dru IDA / 66090 Post Direct 384,900.00 384,894.29 Completed 2020-04-13 2020-04-13 2020-04-18 2020-04-19 2020-05-23 2020-05-30 2020-09-20 2020-06-18 ment and Clinical Care ct) gs for Case Management Pill ar for COVID-19 Intervention through UNICEF LR-MOHSW-187506-GO-RFQ / Purchase of assorted Medic Component 3: Case Manage Request for Quota Single Stage - One E IDA / 66090 Post Limited 114,077.50 95,316.50 Completed 2020-08-15 2020-08-26 2020-10-10 2020-10-09 2021-04-08 2020-12-11 al Gloves & Face Shields for c ment and Clinical Care tions nvelope linical services under the Cas e Management Pillar LR-MOHSW-227111-GO-RFQ / Purchase of 172 pieces of A Component 1: Emergency Pr Request for Quota Single Stage - One E ndroid Phones for Surveillanc IDA / 66090 Post Limited 25,920.00 20,640.00 Signed 2021-04-12 2021-04-22 2021-06-07 2021-07-06 2021-08-06 eparedness Response tions nvelope e Officers at Zonal, District, C ounty and National levels to support contract activities. LR-MOHSW-249439-GO-RFQ Component 4: Community E / Printing of 60 booklets of H Request for Quota Single Stage - One E IDA / 66090 ngagement, Risk Communic Post Limited 700.00 510.00 Completed 2021-09-01 2021-11-02 2021-10-27 2022-01-29 2021-12-26 2022-02-08 ealth Care Waste Manageme tions nvelope ation and Advocacy nt guidelines for 37 health fa cilities LR-MOHSW-249441-GO-DIR / Procurement of 386,452 dos es of COVID-19 Vaccine Janss Component 1: Emergency Pr IDA / D9000 Prior Direct Selection Direct 3,405,435.00 3,405,434.46 Signed 2021-06-22 2021-09-04 2021-06-27 2021-09-13 2021-08-01 2021-10-23 2022-07-27 en Suspension injectables. V eparedness Response accine Against covid-19 (Sars -Cov-2 Vaccine) Ad26.Cov2-S (Recombinant) LR-MOHSW-264881-GO-RFQ / Procurement of Assorted IC Component 1: Emergency Pr Request for Quota Single Stage - One E T Equipment: IDA / D9000 Prior Limited 216,800.00 0.00 Canceled 2021-12-18 2022-02-12 2022-08-11 eparedness Response tions nvelope Lot#1- 154 pcs Laptops Lot#2- 160 pcs tablets LR-MOHSW-265029-GO-DIR / Procurement of assorted vac cine Supplies & equip thru U Component 1: Emergency Pr TF / B6141 Prior Direct Selection Direct 538,000.00 645,696.98 Signed 2021-12-05 2022-04-01 2021-12-10 2022-04-20 2022-01-14 2022-06-13 2023-01-14 NICEF: eparedness Response Lot#-1 - 25 units Ultra low fr eezers Lot#-2 - 36 units Vaccine sto rage LR-MOHSW-238960-GO-RFQ Lot#-3 - 5 units Refrigerated / Procurement to supply, tran van sport, install, train and comm ission three (3) mobile contai Component 3: Case Manage Request for Quota Single Stage - One E IDA / 66090 Post Limited 400,000.00 457,249.11 Signed 2022-02-19 2022-03-07 2022-04-16 2022-07-05 2022-10-13 nerized Oxygen Plants Jordan ment and Clinical Care tions nvelope ian, JFK Hospitals and Liberia Government Hospital. and (1 ) compressor for existing Oxy gen Plant LR-MOHSW-274684-GO-RFQ / Purchase and install 33KVA Component 1: Emergency Pr Request for Quota Single Stage - One E IDA / 66090 Post Limited 25,300.00 0.00 Signed 2022-02-02 2022-03-01 2022-03-30 2022-09-26 generation for REDISSE-II/On eparedness Response tions nvelope e Health Building. LR-MOHSW-304455-GO-RFB / Purchase of 142 pieces of hi Component 1: Emergency Pr Single Stage - One E Under Imple IDA / D9000 Post Request for Bids Open - National 216,800.00 0.00 2022-07-25 2022-08-31 2022-07-30 2022-09-06 2022-09-10 2022-09-30 2022-10-10 2022-11-14 2022-11-14 2023-05-13 gh quality laptop for DIDE at eparedness Response nvelope mentation NPHIL and 54 pieces for EPI Division at MOH LR-MOHSW-308764-GO-RFQ / Printing of 4 by 4ft flex bala nce posters with danger sign s and unauthorized entry me Component 1: Emergency Pr Request for Quota Single Stage - One E Pending Impl IDA / D9000 Post Limited 1,380.00 0.00 2022-08-20 2022-10-15 2023-01-13 ssages on 7 (seven) metal pl eparedness Response tions nvelope ementation ated billboards including inst allation at the National Refer ence Laboratory in Charlesvil le, Margibi County. LR-MOHSW-264886-GO-RFQ Component 1: Emergency Pr Request for Quota Single Stage - One E Pending Impl / Procurement of 2 off road v IDA / D9000 Post Limited 100,000.00 0.00 2022-08-23 2022-10-18 2023-04-16 eparedness Response tions nvelope ementation ehicles for surveillance use LR-MOHSW-317753-GO-RFB / Purchase of assorted reage Component 1: Emergency Pr Single Stage - One E Pending Impl IDA / 66090 Post Request for Bids Open - National 325,160.00 0.00 2022-09-29 2022-10-04 2022-11-15 2022-12-15 2023-01-19 2023-07-18 nts and consumables for cont eparedness Response nvelope ementation inuous testing COVID-19. LR-MOHSW-264884-GO-RFQ / Procurement of solar panel systems in Bomi County: a. Lot 1: 30KVA Solar System , EPI Regional Cold Chain, Kla Component 1: Emergency Pr Request for Quota Single Stage - One E Pending Impl TF / B6141 Post Limited 462,200.00 0.00 2021-12-18 2022-02-12 2022-08-11 y Community Health Center, eparedness Response tions nvelope ementation Klay District, Bomi County, a nd b. Lot 2: 10KVA Solar Syste m, Liberia Government Hospi tal in Tubmanburg, Bomi Cou nty LR-MOHSW-323187-GO-RFB / Procurement of solar panel systems in Bomi County: a. Lot 1: 30KVA Solar System , EPI Regional Cold Chain, Kla Component 1: Emergency Pr Single Stage - One E Under Imple TF / B6141 Post Request for Bids Open - National 354,303.02 0.00 2022-10-30 2022-11-21 2022-10-31 2022-11-22 2022-12-12 2023-01-11 2023-02-15 2023-08-14 y Community Health Center, eparedness Response nvelope mentation Klay District, Bomi County, a nd b. Lot 2: 10KVA Solar Syste m, Liberia Government Hospi tal in Tubmanburg, Bomi Cou nty LR-MOHSW-357434-GO-RFQ / Procurement for the printin g of assorted GBV flyers & po sters and GBV code of condu Component 1: Emergency Pr Request for Quota Single Stage - One E Pending Impl IDA / 66090 Post Limited 14,600.00 0.00 2023-05-09 2023-07-04 2023-12-31 ct, survival response protocol eparedness Response tions nvelope ementation and Grievance redress mech anism manual in the context of COVID-19 vaccination and deployment. LR-MOHSW-359479-GO-RFB / Procurement of assorted Me Component 3: Case Manage Open - Internationa Single Stage - One E Pending Impl IDA / D6080 Post Request for Bids 800,000.00 0.00 2023-05-15 2023-05-20 2023-07-01 2023-07-31 2023-09-04 2024-03-02 dical Beds with matresses an ment and Clinical Care l nvelope ementation d Equipment for clinical servi ces Page 2 LR-MOHSW-359480-GO-RFB / Procurment of 10 KVA solar systems each at the various Component 1: Emergency Pr Single Stage - One E Pending Impl IDA / D6080 Post Request for Bids Open - National 450,000.00 0.00 2023-05-25 2023-05-30 2023-07-11 2023-08-10 2023-09-14 2024-03-12 health faciliates in Monsterra eparedness Response nvelope ementation do Co. (Bensonville, Barnersv ille, Nyein, RCD Marshall and Pipelines) LR-MOHSW-366628-GO-RFQ / Procurement of assorted Inf Component 1: Emergency Pr Request for Quota Single Stage - One E Pending Impl ection Prevention Control (IP IDA / D6080 Post Limited 80,000.00 0.00 2023-06-19 2023-08-14 2024-02-10 eparedness Response tions nvelope ementation C) and water sanitation and hygiene (WASH) supplies for use by NPHIL. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-249437-NC-RFQ Component 5: Project Manag / Hiring of Security Guard Fir Request for Quota Single Stage - One E IDA / 66090 ement and Coordination, Mo Post Limited 30,000.00 26,300.00 Signed 2021-08-31 2021-09-30 2021-10-26 2022-02-24 2022-10-21 m to provide guard services t tions nvelope nitoring and Evaluation o the REDISSE/ One Health B uilding CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LR-MOHSW-175612-CS-INDV Component 5: Project Manag / Hiring of Procurement Offic Individual Consult Under Implement IDA / 66090 ement and Coordination, Mo Post Limited 24,000.00 0.00 2020-06-03 2020-05-19 2020-06-08 2021-04-07 2020-06-29 2020-08-03 2021-07-29 er for the Liberia COVID-19 E ant Selection ation nitoring and Evaluation mergency Response LR-MOHSW-175613-CS-INDV Component 5: Project Manag / Hiring of Project Program Of Individual Consult IDA / 66090 ement and Coordination, Mo Post Limited 24,000.00 24,000.00 Signed 2020-06-03 2020-05-19 2020-06-08 2020-06-15 2020-06-29 2020-08-11 2020-08-03 2020-09-02 2021-01-30 ficer for the Liberia COVID-19 ant Selection nitoring and Evaluation Emergency Response Project LR-MOHSW-175616-CS-INDV Component 5: Project Manag / Hiring of Environmental & S Individual Consult IDA / 66090 ement and Coordination, Mo Post Limited 24,000.00 1,900.00 Signed 2020-06-03 2020-05-19 2020-06-08 2020-10-13 2020-06-29 2020-12-15 2020-08-03 2021-03-10 2030-06-12 afeguards Officer (ESO) for t ant Selection nitoring and Evaluation he Liberia COVID-19 Emerge ncy Response Project LR-MOHSW-193350-CS-INDV Component 5: Project Manag / Hiring of Procurement Offic Individual Consult Under Implement IDA / 66090 ement and Coordination, Mo Prior Limited 24,000.00 0.00 2020-06-03 2020-10-13 2020-06-08 2020-06-15 2020-06-29 2020-08-03 2021-07-29 er for the Liberia COVID-19 E ant Selection ation nitoring and Evaluation mergency Response Project LR-MOHSW-249431-CS-INDV Component 5: Project Manag Individual Consult / Hiring of Social Safeguard O IDA / D9000 ement and Coordination, Mo Post Limited 24,000.00 24,000.00 Signed 2021-08-25 2021-07-08 2021-08-30 2021-09-10 2021-09-20 2022-02-22 2021-10-25 2022-03-09 2022-10-20 ant Selection fficer for the COVID-19 Projec nitoring and Evaluation t LR-MOHSW-269773-CS-INDV / Hiring of a Assistant Financ Component 5: Project Manag Individual Consult e Officer for the COVID-19 Pr IDA / D9000 ement and Coordination, Mo Post Direct 32,400.00 30,000.00 Signed 2021-12-22 2021-12-14 2022-01-01 2022-02-10 2022-01-22 2022-03-10 2022-02-26 2022-03-17 2023-02-26 ant Selection oject for a period of 18 mont nitoring and Evaluation hs. With a initial probation of 6 months. Page 3 PROCUREMENT PLAN Project information: Tanzania, Digital Tanzania Project P160766 Project Implementation agency: Ministry of Communication and Information Technology (MCIT) Date of the Procurement Plan: Sep 28, 2021 Period covered by this Procurement Plan: Oct 2021- Oct 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international and national competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: When approaching the national market, as agreed in the Procurement Plan, the country’s own procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti- Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. For national open competitive procurement the requirements as per National Procurement Procedure (5.4) of Bank’s Procurement Regulations will apply Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations –Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not applicable Other Relevant Procurement Information. None PROCUREMENT Tanzania : Digital Tanzania Project PLAN General Information Country: Tanzania 2021-10-04 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160766 GPN Date: 2021-08-17 Project Name: Digital Tanzania Project Loan / Credit No: IDA / 68930 Ministry of Communication and Information Technology Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual National Proc TZ-MCIT-254774-CW-RFB / R urement Doc 3. Digital Platforms and Serv Single Stage - One E Under Imple 2023-02-2 ehabilitation of Huduma Pam IDA / 68930 Post Request for Bids Open - National ument - 1 En 0.00 2022-05-08 2022-01-06 2022-05-13 2022-06-24 2022-07-24 2022-08-28 ices nvelope mentation 4 oja Building -Phase I velope proce ss (Non Bank -SPD) National Proc TZ-MCIT-254784-CW-RFB / R urement Doc Single Stage - One E Pending Imp 2024-02-2 ehabilitation of e-commerce i IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National ument - 1 En 0.00 2023-06-30 2023-07-05 2023-08-16 2023-09-15 2023-10-20 nvelope lementation 0 nnovation Center at TPC-HQ velope proce ss (Non Bank -SPD) National Proc urement Doc TZ-MCIT-254771-CW-RFB / R Single Stage - One E Pending Imp 2024-06-1 IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National ument - 1 En 0.00 2023-08-25 2023-08-30 2023-10-11 2023-11-10 2023-12-15 ehabilitation of Refurb Labs nvelope lementation 2 velope proce ss (Non Bank -SPD) National Proc TZ-MCIT-254780-CW-RFB / E urement Doc Single Stage - One E Under Imple 2024-01-0 xpansion of Government Net IDA / 68930 2. Digital Connectivity Post Request for Bids Open - National ument - 1 En 0.00 2023-03-15 2023-03-06 2023-03-20 2023-05-01 2023-05-31 2023-07-05 nvelope mentation 1 work- Phase I velope proce ss (Non Bank -SPD) National Proc TZ-MCIT-254785-CW-RFB / R urement Doc Single Stage - One E Pending Imp 2024-05-2 ehabilitation of Zonal Innovat IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National ument - 1 En 0.00 2023-08-10 2023-08-15 2023-09-26 2023-10-26 2023-11-30 nvelope lementation 8 ion Centers velope proce ss (Non Bank -SPD) Request for B TZ-MCIT-289679-CW-RFB / P ids - Small W Single Stage - One E Pending Imp 2024-02-0 roposed Extension of Office B IDA / 68930 4. Project Management Post Request for Bids Open - National orks SPD (1 e 0.00 2023-04-30 2023-05-05 2023-06-04 2023-07-04 2023-08-08 nvelope lementation 4 uildings of Digital Tanzania P nvelope proc roject ess) National Proc TZ-MCIT-254764-CW-RFB / P urement Doc roposed Design and Build of Single Stage - One E 2023-05-3 IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National ument - 1 En 0.00 Canceled 2022-11-08 2022-11-13 2022-12-25 2023-01-24 2023-02-28 Digital Technology Institute ( nvelope 1 velope proce DTI) ss (Non Bank -SPD) Request for B TZ-MCIT-254781-CW-RFB / C ids - Small W Single Stage - One E 2022-11-0 onstruction and enhancemen IDA / 68930 2. Digital Connectivity Post Request for Bids Open - National orks SPD (1 e 0.00 Canceled 2022-01-16 2022-06-08 2022-01-21 2022-03-04 2022-04-03 2022-05-08 nvelope 4 t of Resilient network infrastr nvelope proc ucture ess) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MCIT-254586-GO-RFB / S upply, Installation and Comm 3. Digital Platforms and Serv Open - Internationa Single Stage - One E Under Imple issioning of Bulk computing a IDA / 68930 Prior Request for Bids 0.00 2022-04-30 2022-08-01 2022-05-05 2022-08-22 2022-06-20 2022-10-07 2022-07-04 2022-08-08 2022-12-08 ices l nvelope mentation nd storage capacity for enha ncement and Development o f Data Center Infrastructure TZ-MCIT-278874-GO-RFB / S UPPLY, INSTALLATION AND C Single Stage - One E IDA / 68930 2. Digital Connectivity Prior Request for Bids Open - National 0.00 Signed 2022-02-28 2022-03-07 2022-03-05 2022-03-24 2022-04-16 2022-04-22 2022-05-16 2022-09-16 2022-06-20 2022-12-17 OMMISSIOINING OF BANDWI nvelope DTH TERMINATION EQUIPME NT TZ-MCIT-254802-GO-RFB / S upply, Installation and Comm Open - Internationa Single Stage - One E issioning of Active and Passiv IDA / 68930 2. Digital Connectivity Prior Request for Bids 0.00 Canceled 2022-03-24 2022-03-29 2022-05-13 2022-06-12 2022-07-17 2022-10-17 l nvelope e Network Equipment, Power Back Up for GovNet Connect ivity -Phase I TZ-MCIT-300888-GO-RFB / S upply, Installation and Comm Open - Internationa Single Stage - One E Under Imple issioning of Active and Passiv IDA / 68930 2. Digital Connectivity Prior Request for Bids 0.00 2022-07-04 2022-08-01 2022-07-09 2022-08-22 2022-08-23 2022-10-07 2022-09-22 2022-10-27 2023-01-27 l nvelope mentation e Network Equipment, Power Back Up for GovNet Connecti vity -Phase I TZ-MCIT-254584-GO-RFQ / S upply of Communication wor 3. Digital Platforms and Serv Request for Quota Single Stage - One E IDA / 68930 Post Open - National 0.00 Canceled 2022-02-26 2022-04-28 2022-04-23 2022-06-10 king tools and promotional m ices tions nvelope aterial for Digital Tanzania Pr oject TZ-MCIT-306161-GO-RFQ / S upply of Communication tool 3. Digital Platforms and Serv Request for Quota Single Stage - One E IDA / 68930 Post Limited 0.00 Signed 2022-08-20 2022-08-29 2022-09-30 2022-10-30 s and promotion materials fo ices tions nvelope r Digital Tanzania Project TZ-MCIT-254806-GO-RFB / S upply, Installation and Comm Single Stage - One E Pending Impl IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National 0.00 2023-06-20 2023-06-25 2023-08-06 2023-09-05 2023-10-10 2024-01-29 issioning of ICT Equipment f nvelope ementation or Digital e-Commerce Platfo rm TZ-MCIT-254804-GO-RFB / S upply, Installation and Comm 3. Digital Platforms and Serv Single Stage - One E Pending Impl issioning of ICT Equipment a IDA / 68930 Prior Request for Bids Open - National 0.00 2023-06-15 2023-06-20 2023-08-04 2023-09-03 2023-10-08 2024-04-05 ices nvelope ementation nd Associated Software for H uduma Pamoja Center-Phase I TZ-MCIT-306312-GO-DIR / S Under Imple upply of Four Motor Vehicles IDA / 68930 4. Project Management Post Direct Selection Direct - National 0.00 2022-08-15 2022-09-26 2022-08-20 2022-09-26 2022-09-24 2023-03-23 mentation for the Project TZ-MCIT-254787-GO-RFB / S upply, Installation and Comm Single Stage - One E Pending Impl IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National 0.00 2022-12-21 2022-12-26 2023-02-09 2023-03-11 2023-04-15 2023-08-31 issioning of ICT Equipment fo nvelope ementation r Digital Technology Institute -Phase I Page 1 TZ-MCIT-254797-GO-RFB / S Single Stage - One E Pending Impl upply, Installation and Comm IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National 0.00 2024-01-10 2024-01-15 2024-02-26 2024-03-27 2024-05-01 2024-08-13 nvelope ementation issioning of ICT Equipment fo r Zonal Centers TZ-MCIT-254799-GO-RFB / S upply, Installation and Comm Single Stage - One E Pending Impl IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National 0.00 2024-01-25 2024-01-30 2024-03-15 2024-04-14 2024-05-19 2024-09-27 issioning of of ICT Equipment nvelope ementation for Refurbishment Center TZ-MCIT-254575-GO-RFB / S Single Stage - One E Pending Impl upply, Installation and Comm IDA / 68930 1. Digital Ecosystem Post Request for Bids Open - National 0.00 2023-04-10 2023-04-15 2023-05-30 2023-06-29 2023-08-03 2023-11-10 nvelope ementation issioning of ICT Equipment fo r NISMIS TZ-MCIT-258719-GO-RFB / S upply of four Motor vehicles f IDA / 68930 4. Project Management Post Direct Selection Direct 0.00 Canceled 2022-02-25 2022-03-02 2022-04-06 2022-10-03 or the Project NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MCIT-254587-NC-RFQ / Pr 3. Digital Platforms and Serv Request for Quota Single Stage - One E ovision of air time for TV and IDA / 68930 Post Open - National 0.00 Canceled 2021-10-30 2021-12-25 2022-06-23 ices tions nvelope Radio Programs for ICT Devel opment TZ-MCIT-254597-NC-RFB / Pr Open - Internationa Single Stage - One E Under Imple e-purchase of Dedicated Ban IDA / 68930 2. Digital Connectivity Prior Request for Bids 0.00 2022-01-31 2022-09-23 2022-02-05 2022-09-30 2022-03-22 2022-11-11 2022-04-21 2023-03-29 2022-05-26 2022-08-24 l nvelope mentation dwidth for GovNet TZ-MCIT-285632-NC-RFB / U Open - Internationa Single Stage - One E Under Imple pgrade of Existing Cell Tower IDA / 68930 2. Digital Connectivity Prior Request for Bids 0.00 2022-04-20 2022-08-22 2022-04-25 2022-08-31 2022-06-06 2022-10-13 2022-07-06 2023-04-08 2022-07-29 2022-10-27 l nvelope mentation s from 2G to 3G, 4G and abo ve TZ-MCIT-285550-NC-RFB / E xtension of contract for Inter net Bandwidth under the Tan IDA / 68930 2. Digital Connectivity Post Direct Selection Direct 410,000.00 Signed 2022-04-13 2022-04-16 2022-04-20 2022-04-21 2022-05-28 2022-07-10 2022-11-24 zania Communication Infrastr ucture and e-Government Pr oject- CONTRACT NO. ME.006 /2011-2012/NC/RCIP/01 TZ-MCIT-306158-NC-RFB / N Open - Internationa Single Stage - One E Under Imple ew Cell Sites in Underserved IDA / 68930 2. Digital Connectivity Prior Request for Bids 0.00 2022-09-30 2022-10-13 2022-10-05 2022-11-24 2022-11-16 2023-01-31 2022-12-16 2023-04-19 2023-01-20 2023-07-19 l nvelope mentation Areas -DTP Phase I TZ-MCIT-254590-NC-RFB / Pr 3. Digital Platforms and Serv Single Stage - One E Pending Impl oduction and Dissemination IDA / 68930 Post Request for Bids Open - National 0.00 2023-10-31 2023-11-05 2023-12-17 2024-01-16 2024-02-20 2024-04-30 ices nvelope ementation of Content on Digital Tanzani a Project CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MCIT-268417-CS-QCBS / Provision of Consultancy Serv ices to Conduct assessment f Quality And Cost- or Establishment of the Digit IDA / 68930 1. Digital Ecosystem Post Open - National 0.00 Signed 2022-01-14 2022-05-29 2022-02-04 2022-06-10 2022-03-20 2022-08-17 2022-04-17 2022-09-16 2022-05-17 2022-10-19 2022-06-21 2022-10-24 2022-07-26 2022-11-27 Based Selection al Technology Institute, Zona l Soft Centers and ICT equip ment refurbishment centers ( Fab labs) TZ-MCIT-268423-CS-QCBS / Provision of consultancy serv ices to conduct analysis, revi 3. Digital Platforms and Serv Quality And Cost- IDA / 68930 Post Open - National 276,752.28 Signed 2022-01-14 2022-01-28 2022-02-04 2022-03-04 2022-03-20 2022-04-27 2022-04-17 2022-07-08 2022-05-17 2022-06-17 2022-06-21 2022-07-14 2022-07-26 2022-08-10 2022-12-26 ew process mapping, re-engi ices Based Selection neering and establish service s requirements offered by go vernment TZ-MCIT-268429-CS-CQS / Pr ovision of consultancy servic es to conduct business and o 3. Digital Platforms and Serv Consultant Qualifi IDA / 68930 Post Open - National 0.00 Signed 2022-01-30 2022-01-29 2022-02-20 2022-03-04 2022-04-05 2022-04-27 2022-05-05 2022-09-07 2022-06-09 2022-09-09 perational model design and ices cation Selection development of operational manual for huduma pamoja c enters TZ-MCIT-268757-CS-CQS / Pr ovision of Consultancy Servic Consultant Qualifi IDA / 68930 2. Digital Connectivity Post Open - National 240,951.79 Signed 2022-01-30 2022-02-04 2022-02-20 2022-02-16 2022-04-05 2022-04-20 2022-05-05 2022-07-13 2022-06-09 2022-08-10 2022-09-09 es to undertake study on TV cation Selection White Space Spectrum TZ-MCIT-268760-CS-CQS / Pr ovision of consultancy Servic 3. Digital Platforms and Serv Consultant Qualifi IDA / 68930 Post Open - National 0.00 Canceled 2022-01-20 2022-02-02 2022-02-10 2022-02-15 2022-03-26 2022-04-20 2022-04-25 2022-05-30 2022-08-30 es for Preparation of National ices cation Selection Digital Economy Strategy TZ-MCIT-254648-CS-CQS / Pr ovision of Consultancy servic Consultant Qualifi IDA / 68930 1. Digital Ecosystem Post Open - National 0.00 Signed 2022-01-20 2022-04-04 2022-01-20 2022-04-16 2022-03-05 2022-09-26 2022-04-04 2022-10-19 2022-05-09 2022-08-15 e to conduct feasibility study cation Selection for e-commerce redness TZ-MCIT-258591-CS-QCBS / Provision of Consultancy for Quality And Cost- Open - Internationa System Analysis, Designing IDA / 68930 1. Digital Ecosystem Post 0.00 Signed 2022-02-04 2022-03-30 2022-02-25 2022-05-09 2022-04-10 2022-08-25 2022-05-08 2022-09-23 2022-06-07 2022-12-14 2022-07-12 2022-12-14 2022-08-16 2023-08-16 Based Selection l and deployment for National Statistical Information Manag ement System (NISMIS) TZ-MCIT-254810-CS-CQS / Pr ovision of Consultancy Servic Consultant Qualifi es to conduct feasibility stud IDA / 68930 1. Digital Ecosystem Post Open - National 0.00 Canceled 2021-10-28 2021-11-18 2022-01-01 2022-01-31 2022-03-07 2022-09-03 cation Selection y, design and supervision for establishment of refurb Labs TZ-MCIT-254811-CS-QCBS / Provision of Consultancy Serv 3. Digital Platforms and Serv Quality And Cost- Open - Internationa ices for Business Process Ree IDA / 68930 Post 0.00 Canceled 2021-10-20 2021-11-10 2021-12-24 2022-01-21 2022-02-20 2022-03-27 2022-05-01 2023-05-01 ices Based Selection l ngineering, Mapping and Ope rational mode for Huduma Pa moja Center Page 2 TZ-MCIT-254814-CS-QCBS / Provision of Consultancy Serv Consultant Qualifi IDA / 68930 1. Digital Ecosystem Post Open - National 184,116.34 Signed 2022-01-10 2022-01-31 2022-01-31 2022-02-15 2022-03-16 2022-04-20 2022-04-15 2022-07-12 2022-05-20 2022-08-10 2022-11-16 ices for scanning of ICT Polic cation Selection y, Legal and Regulatory Envir onment TZ-MCIT-254809-CS-CQS / Pr ovision of Consultancy Servic Consultant Qualifi Under Implement es to conduct assessment for IDA / 68930 1. Digital Ecosystem Post Open - National 0.00 2022-02-21 2022-01-29 2022-03-14 2022-04-27 2022-05-27 2022-07-01 2022-12-28 cation Selection ation development of Digital Maps for National Addressing and P ostcode system TZ-MCIT-254653-CS-QCBS / Provision of consultancy serv ice to conduct feasibility stu Quality And Cost- IDA / 68930 1. Digital Ecosystem Post Open - National 0.00 Canceled 2021-10-27 2021-11-17 2021-12-31 2022-01-28 2022-02-27 2022-04-03 2022-05-08 2023-05-08 dy, design and supervision fo Based Selection r establishment of National C enter for ICT Professionals a nd Zonal Innovation Center TZ-MCIT-300894-CS-CQS / Pr ovision of Consultancy Servic Consultant Qualifi Under Implement es for Design Review and Su IDA / 68930 4. Project Management Post Open - National 0.00 2022-10-20 2023-02-25 2022-11-10 2023-03-15 2022-12-24 2023-01-23 2023-02-27 2023-08-26 cation Selection ation pervision for Extension of PIU Offices Building for Digital Ta nzania Office TZ-MCIT-314860-CS-CQS / Pr ovision of Consultancy Servic es to conduct Environmental Consultant Qualifi Under Implement and Social Impact Assessmen IDA / 68930 4. Project Management Post Open - National 0.00 2022-09-30 2022-09-30 2022-10-21 2022-10-17 2022-12-04 2023-01-17 2023-01-03 2023-02-07 2023-04-28 cation Selection ation ts and Environmental Audits f or the Sub-Projects implemen ted under Digital Tanzania Pr oject (DTP) TZ-MCIT-314850-CS-QCBS / Provision of Consultancy for 3. Digital Platforms and Serv Quality And Cost- Under Implement IDA / 68930 Post Open - National 0.00 2022-10-10 2022-09-27 2022-10-31 2022-12-14 2023-01-11 2023-02-10 2023-03-07 2023-04-02 2023-09-29 Design and Supervision for re ices Based Selection ation habilitation of Huduma Pamoj a Centers TZ-MCIT-258590-CS-QCBS / Provision of Consultancy for s Quality And Cost- Open - Internationa Pending Impleme IDA / 68930 1. Digital Ecosystem Post 0.00 2023-03-15 2023-04-05 2023-05-19 2023-06-16 2023-07-16 2023-08-20 2023-09-15 2024-08-20 ystem analysis, designing an Based Selection l ntation d deployment of e-commerce Platform TZ-MCIT-331709-CS-CQS / Pr ovision of Consultancy Servic Consultant Qualifi Pending Impleme es for Review of Design and IDA / 68930 1. Digital Ecosystem Post Open - National 0.00 2023-01-20 2023-02-10 2023-03-26 2023-04-25 2023-05-30 2023-06-30 cation Selection ntation Supervision for Rehabilitation of e-Commerce innovation Center at TPC-HQ TZ-MCIT-254808-CS-CQS / Pr 3. Digital Platforms and Serv Consultant Qualifi Pending Impleme ovision of Consultancy Servic IDA / 68930 Post Open - National 0.00 2023-03-20 2023-04-10 2023-05-24 2023-06-23 2023-07-28 2023-11-27 ices cation Selection ntation es for ICT short course Traini ng TZ-MCIT-335718-CS-QCBS / Provision of Consultancy Serv Quality And Cost- Pending Impleme IDA / 68930 1. Digital Ecosystem Post Open - National 0.00 2023-03-15 2023-04-05 2023-05-19 2023-06-16 2023-07-16 2023-08-20 2023-09-24 2024-01-31 ices to Conduct National ICT Based Selection ntation house hold Survey in Tanzani a TZ-MCIT-345710-CS-QCBS / 3. Digital Platforms and Serv Quality And Cost- Under Implement Provision of Consultancy Serv IDA / 68930 Post Open - National 0.00 2023-04-28 2023-03-25 2023-05-19 2023-05-03 2023-07-02 2023-07-30 2023-08-29 2023-10-03 2023-10-20 2024-02-13 ices Based Selection ation ices for Set Up the Data Prot ection Authority TZ-MCIT-360329-CS-QCBS / PROVISION OF CONSULTANC 3. Digital Platforms and Serv Quality And Cost- Open - Internationa Pending Impleme Y SERVICES FOR DESIGN AN IDA / 68930 Post 0.00 2023-06-15 2023-06-21 2023-07-20 2023-08-17 2023-09-16 2023-10-21 2023-11-25 2025-04-30 ices Based Selection l ntation D SUPERVISION OF REHABILI TATION OF HUDUMA PAMOJA CENTERS INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-MCIT-364000-CS-INDV / P rovision of Consultancy servi 3. Digital Platforms and Serv Individual Consult Pending Impleme ces for Supervision(Lead Con IDA / 68930 Post Limited 0.00 2023-06-15 2023-06-20 2023-07-11 2023-08-15 2024-07-31 ices ant Selection ntation sultant) of Huduma Pamoja S ystem design, development and implementation Page 3 PROCUREMENT PLAN (Textual Part) Moldova Project information: P167790 – Higher Education Project Project Implementation agency: Ministry of Education, Culture and Research Date of the Procurement Plan: March 2020 Period covered by this Procurement Plan: March 2020 – December 2025 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. As part of project preparations and negotiations, it has been agreed that the Implementing Agency will use the Procurement Documents which have been previously used by the Ministry in other projects and as agreed with the Bank. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Procurement arrangements under the Higher Education Improvement Program (HEIP) Procurement under the HEIP will be managed by HEIP beneficiaries within the scope of their approved proposals. This would include procurement of goods, minor civil works (for pedagogical colleges only), consulting, non-consulting services and training. Goods to be procured would be mainly for equipping the laboratories and learning spaces. It is expected that procurement of these goods will follow the international market approach and for which the Standard Procurement Documents will be used. For procurement following the national market approach, the same arrangement is foreseen as provided in the Section on National Procurement Arrangements (above). PROCUREMENT Moldova : Higher Education Project PLAN General Information Country: Moldova 2020-12-18 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167790 GPN Date: 2020-09-14 Project Name: Higher Education Project Loan / Credit No: IDA / 65420 Ministry of Education, Culture and Research Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-MOED-206409-GO-RFQ / Request for Quota Single Stage - One E Accounting system according IDA / 65420 3 – Project Management Post Open - National 12,437.00 340.95 Completed 2021-01-08 2021-03-05 2021-05-22 2021-09-01 2021-06-01 tions nvelope to the WB rules MD-MOED-206045-GO-RFQ / 1 – Improving the Quality As Request for Quota Single Stage - One E Pending Impl Equipment for the Unit Respo IDA / 65420 Post Open - National 85,498.00 0.00 2022-01-03 2022-05-02 2022-10-29 surance Mechanisms tions nvelope ementation nsible for Implementing e-Ad mission MD-MOED-211430-GO-RFQ / 1 – Improving the Quality As Request for Quota Single Stage - One E Pending Impl Furniture for the Unit Respon IDA / 65420 Post Open - National 21,375.00 0.00 2022-01-03 2022-05-02 2022-10-29 surance Mechanisms tions nvelope ementation sible for Implementing e-Ad mission MD-MOED-244633-GO-RFB / 1 – Improving the Quality As Open - Internationa Single Stage - One E Pending Impl HEMIS Development, Mainte IDA / 65420 Post Request for Bids 1,389,336.00 0.00 2022-01-10 2022-02-09 2022-04-10 2022-05-10 2022-07-09 2024-07-31 surance Mechanisms l nvelope ementation nance and Training of Users. MD-MOED-244636-GO-RFB / LMIS system (NEA and LMO 1 – Improving the Quality As Open - Internationa Single Stage - One E Pending Impl IDA / 65420 Post Request for Bids 1,902,320.00 0.00 2022-01-09 2022-02-08 2022-04-09 2022-05-09 2022-07-08 2024-07-31 components) Development, surance Mechanisms l nvelope ementation Maintenance and Training of Users MD-MOED-206063-GO-RFB / 1 – Improving the Quality As Single Stage - One E Pending Impl Equipment for the Operation IDA / 65420 Post Request for Bids Open - National 390,083.00 0.00 2022-07-01 2022-10-01 2022-11-12 2022-12-24 2023-01-28 2023-07-31 surance Mechanisms nvelope ementation of the LMIS MD-MOED-206087-GO-RFB / Purchase of Equipment and S 1 – Improving the Quality As Single Stage - One E IDA / 65420 Post Request for Bids Open - National 122,903.00 0.00 Canceled 2021-12-20 2022-01-23 2022-03-09 2022-03-29 2022-04-22 2022-08-31 tatistical Package for the Gra surance Mechanisms nvelope duate Tracer Study MD-MOED-286143-GO-RFQ / 1 – Improving the Quality As Request for Quota Single Stage - One E Purchase of IT Equipment for IDA / 65420 Post Open - National 11,000.00 6,759.00 Completed 2022-04-02 2022-05-28 2022-05-02 2022-07-27 2022-08-05 surance Mechanisms tions nvelope the Graduate Tracer Study MD-MOED-263410-GO-RFB / IT company for e-Admission 1 – Improving the Quality As Open - Internationa Single Stage - One E IDA / 65420 Post Request for Bids 988,104.00 0.00 Canceled 2022-02-15 2022-11-08 2022-02-20 2022-11-09 2022-04-06 2022-12-27 2022-04-26 2023-02-22 2022-05-31 2023-12-29 system development, mainte surance Mechanisms l nvelope nance and training of users NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-MOED-206314-GO-RFQ / 2 – Improving the Labor Mar Logistic Company for events Request for Quota Single Stage - One E Pending Impl IDA / 65420 ket Orientation through Targ Post Open - National 18,600.00 0.00 2021-04-19 2021-06-14 2025-12-31 organisation for Higher Educ tions nvelope ementation eted Interventions ation Improvement Program Preparation MD-MOED-206325-NC-RFQ / 2 – Improving the Labor Mar Request for Quota Single Stage - One E Translation services of the re IDA / 65420 ket Orientation through Targ Post Open - National 4,800.00 0.00 Canceled 2021-02-08 2021-04-05 2021-06-30 tions nvelope levant documents for grant b eted Interventions eneficiaries MD-MOED-209125-NC-RFQ / Request for Quota Single Stage - One E Pending Impl IDA / 65420 3 – Project Management Post Open - National 64,123.00 0.00 2021-02-21 2021-04-18 2024-12-31 Logistical Support to Training tions nvelope ementation Activities MD-MOED-206333-GO-RFQ / Transport company to ensure 2 – Improving the Labor Mar Request for Quota Single Stage - One E Pending Impl the monitoring visits for impl IDA / 65420 ket Orientation through Targ Post Open - National 28,800.00 0.00 2022-07-05 2022-08-30 2025-09-30 tions nvelope ementation ementation stage setting, ris eted Interventions k assessment and elaboratio n of the mitigation plan. MD-MOED-206743-NC-RFB / 1 – Improving the Quality As Single Stage - One E Pending Impl Digitalization of Diplomas Iss IDA / 65420 Post Request for Bids Open - National 851,770.00 0.00 2022-03-01 2022-03-21 2022-05-05 2022-05-25 2022-06-29 2023-12-29 surance Mechanisms nvelope ementation ued Before 2008 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-MOED-206078-CS-QCBS / Technical and Logistical Sup 1 – Improving the Quality As Quality And Cost- Open - Internationa IDA / 65420 Post 491,611.00 0.00 Canceled 2021-01-03 2021-04-04 2021-05-18 2021-06-15 2021-07-15 2021-08-19 2021-09-23 2023-02-28 port to the Implementation of surance Mechanisms Based Selection l the Graduate Tracer Study MD-MOED-206331-CS-CQS / 2 – Improving the Labor Mar Consulting company for impl Consultant Qualifi Pending Impleme IDA / 65420 ket Orientation through Targ Post Open - National 66,000.00 0.00 2021-07-01 2021-09-29 2021-11-12 2021-12-12 2022-01-16 2022-07-15 ementation of the communic cation Selection ntation eted Interventions ation campaign Page 1 MD-MOED-206336-CS-CQS / Consulting company for elab oration of the final report rel 2 – Improving the Labor Mar Consultant Qualifi Pending Impleme ated to results obtained and i IDA / 65420 ket Orientation through Targ Post Open - National 18,000.00 0.00 2025-01-01 2025-04-01 2025-05-15 2025-06-14 2025-07-19 2025-12-31 cation Selection ntation ndicators achieved within im eted Interventions plemented Sub-Projects and distribution of the informatio n to the stakeholders MD-MOED-206413-CS-CQS / Consulting company for ident Consultant Qualifi IDA / 65420 3 – Project Management Post Open - National 53,436.00 41,952.28 Signed 2021-01-03 2021-07-08 2021-03-14 2021-04-27 2021-12-24 2021-05-27 2022-03-24 2021-07-01 2022-03-29 2021-12-31 ification of Academic Progra cation Selection ms in high demand in the lab or market MD-MOED-206417-CS-CQS / Consulting company to devel Consultant Qualifi IDA / 65420 3 – Project Management Post Open - National 106,872.00 0.00 Signed 2021-03-01 2022-03-18 2021-05-02 2021-06-15 2022-08-04 2021-07-15 2022-09-20 2021-08-19 2024-12-31 op and implement surveys wi cation Selection th beneficiaries MD-MOED-206695-CS-CQS / Development of Qualification 1 – Improving the Quality As Consultant Qualifi IDA / 65420 Post Open - National 124,292.00 118,031.01 Completed 2020-11-26 2021-02-16 2021-01-17 2021-03-02 2021-06-29 2021-04-01 2021-11-23 2021-05-06 2021-12-01 2021-12-31 2023-01-08 Standards for manufacturing surance Mechanisms cation Selection and processing technologies MD-MOED-206697-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 16,212.00 15,541.42 Completed 2020-11-26 2021-02-16 2021-01-17 2021-03-02 2021-06-28 2021-04-01 2021-11-25 2021-05-06 2021-12-01 2021-12-31 2023-03-11 surance Mechanisms cation Selection Standards for administrative sciences MD-MOED-206698-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 140,504.00 124,094.82 Completed 2020-11-26 2021-02-16 2021-01-17 2021-03-02 2021-06-29 2021-04-01 2021-11-25 2021-05-06 2021-12-01 2021-12-31 2023-03-26 surance Mechanisms cation Selection Standards for economic scien ces MD-MOED-206701-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 21,616.00 19,581.18 Completed 2020-11-26 2021-02-16 2021-01-17 2021-03-02 2021-06-28 2021-04-01 2021-11-25 2021-05-06 2021-12-01 2021-12-31 2023-03-09 surance Mechanisms cation Selection Standards for law MD-MOED-206702-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 259,391.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-11-24 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for arts MD-MOED-206707-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 81,060.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for humanities MD-MOED-206708-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 59,443.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for philology MD-MOED-206709-CS-CQS / Development of Qualification 1 – Improving the Quality As Consultant Qualifi IDA / 65420 Post Open - National 70,251.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 Standards for social and beh surance Mechanisms cation Selection avioral sciences MD-MOED-206710-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 48,636.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for journalism and information MD-MOED-206711-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 27,020.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for chemical scien ces MD-MOED-206712-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 37,828.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for biological scien ces MD-MOED-206713-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 16,212.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for environmental sciences MD-MOED-206714-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 70,252.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for physical scienc es MD-MOED-206715-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 37,828.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-12-05 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for mathematics a nd statistics MD-MOED-206717-CS-CQS / Development of Qualification 1 – Improving the Quality As Consultant Qualifi IDA / 65420 Post Open - National 297,219.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-11-16 2022-04-18 2022-12-30 Standards for engineering an surance Mechanisms cation Selection d engineering activities MD-MOED-206719-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 102,676.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-11-16 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for architecture an d construction MD-MOED-206720-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 70,252.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2023-02-16 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for security servic es MD-MOED-206722-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Development of Qualification IDA / 65420 Post Open - National 16,212.00 0.00 Signed 2021-10-01 2022-03-18 2021-12-30 2022-02-12 2022-06-06 2022-03-14 2022-11-16 2022-04-18 2022-12-30 surance Mechanisms cation Selection Standards for transport servi ces MD-MOED-206723-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Under Implement Development of Qualification IDA / 65420 Post Open - National 72,252.00 0.00 2022-10-03 2023-03-01 2023-01-01 2023-02-14 2023-03-16 2023-04-20 2023-12-29 surance Mechanisms cation Selection ation Standards for agricultural sci ences MD-MOED-206724-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Under Implement Development of Qualification IDA / 65420 Post Open - National 16,212.00 0.00 2022-10-03 2023-03-01 2023-01-01 2023-02-14 2023-03-16 2023-04-20 2023-12-29 surance Mechanisms cation Selection ation Standards for silviculture MD-MOED-206725-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Under Implement Development of Qualification IDA / 65420 Post Open - National 16,212.00 0.00 2022-10-03 2023-03-01 2023-01-01 2023-02-14 2023-03-16 2023-04-20 2023-12-29 surance Mechanisms cation Selection ation Standards for veterinary med icine MD-MOED-206726-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Under Implement Development of Qualification IDA / 65420 Post Open - National 43,232.00 0.00 2022-10-03 2023-03-01 2023-01-01 2023-02-14 2023-03-16 2023-04-20 2023-12-29 surance Mechanisms cation Selection ation Standards for sports sciences Page 2 MD-MOED-206728-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Under Implement Development of Qualification IDA / 65420 Post Open - National 27,020.00 0.00 2022-10-03 2023-03-01 2023-01-01 2023-02-14 2023-03-16 2023-04-20 2023-12-29 surance Mechanisms cation Selection ation Standards for public services MD-MOED-206729-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Pending Impleme Updating / revising Qualificati IDA / 65420 Post Open - National 81,060.00 0.00 2023-10-02 2023-12-31 2024-02-13 2024-03-14 2024-04-18 2024-12-31 surance Mechanisms cation Selection ntation on Standards for education s ciences MD-MOED-206731-CS-CQS / Updating / revising Qualificati 1 – Improving the Quality As Consultant Qualifi Pending Impleme IDA / 65420 Post Open - National 81,060.00 0.00 2023-10-02 2023-12-31 2024-02-13 2024-03-14 2024-04-18 2024-12-31 on Standards for Information surance Mechanisms cation Selection ntation and communication technolo gies MD-MOED-206732-CS-CQS / 1 – Improving the Quality As Consultant Qualifi Pending Impleme Updating / revising Qualificati IDA / 65420 Post Open - National 81,060.00 0.00 2023-10-02 2023-12-31 2024-02-13 2024-03-14 2024-04-18 2024-12-31 surance Mechanisms cation Selection ntation on Standards for health MD-MOED-243681-CS-CQS / Company for Quality Assuran 1 – Improving the Quality As Consultant Qualifi Pending Impleme ce, Security testing and user IDA / 65420 Post Open - National 36,000.00 0.00 2023-01-04 2023-01-25 2023-03-10 2023-04-09 2023-05-14 2023-12-31 surance Mechanisms cation Selection ntation acceptance of the LMIS syste m (NEA and LMO compone nts) MD-MOED-206040-CS-CQS / Development and implement 1 – Improving the Quality As Consultant Qualifi IDA / 65420 Post Open - National 213,744.00 0.00 Canceled 2022-10-03 2023-01-02 2023-02-15 2023-03-17 2023-04-21 2024-08-30 ation of communication cam surance Mechanisms cation Selection paigns on e-Admission Syste m MD-MOED-206102-CS-CQS / Development and Implement 1 – Improving the Quality As Consultant Qualifi IDA / 65420 Post Open - National 106,872.00 0.00 Canceled 2021-04-01 2021-06-01 2021-07-15 2021-08-14 2021-10-01 2023-10-31 ation of a Communication Str surance Mechanisms cation Selection ategy on the New Financing Mechanism MD-MOED-263412-CS-CQS / Consultant Qualifi IDA / 65420 3 – Project Management Post Limited 133,590.00 0.00 Completed 2021-12-06 2022-01-24 2022-01-10 2022-03-29 2022-01-24 2022-04-19 2022-02-28 2022-12-29 2022-06-19 Audit of the MHEP cation Selection MD-MOED-206427-CS-LCS / Least Cost Selecti IDA / 65420 3 – Project Management Post Open - National 133,590.00 0.00 Canceled 2021-05-02 2021-05-23 2021-07-06 2021-08-03 2021-09-02 2021-10-07 2021-11-11 2025-12-31 Audit of the MHEP on INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MD-MOED-205737-CS-INDV / Development of Terms of Ref 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 3,206.00 2,380.34 Completed 2021-01-04 2021-06-04 2021-04-05 2022-01-08 2021-04-26 2022-02-03 2021-05-31 2022-02-08 2021-08-31 erence for digitalization of ar surance Mechanisms ant Selection chive of documents MD-MOED-205741-CS-INDV / Individual Consultant to impr ove methodologies on extern 1 – Improving the Quality As Individual Consult al evaluation for the Accredit IDA / 65420 Post Open 37,405.00 32,627.53 Signed 2020-11-30 2021-02-15 2021-02-17 2021-06-16 2021-03-10 2021-08-23 2021-04-30 2021-08-24 2022-05-31 surance Mechanisms ant Selection ation of Higher Education Pro grams and Institutions Offeri ng Master and Doctoral Prog rams MD-MOED-205752-CS-INDV / Individual Consultant to assis 1 – Improving the Quality As Individual Consult t the NAQAER in strategic pla IDA / 65420 Post Open 20,400.00 18,863.63 Signed 2020-11-20 2021-09-15 2021-02-07 2021-12-03 2021-02-28 2022-01-19 2021-04-04 2022-01-31 2022-04-04 surance Mechanisms ant Selection nning on internal quality ass urance according to the Euro pean standards MD-MOED-205754-CS-INDV / Individual Consultant to deli 1 – Improving the Quality As Individual Consult ver training to 200 university IDA / 65420 Post Open 22,349.00 11,030.18 Completed 2020-11-20 2021-09-15 2021-02-07 2021-12-03 2021-02-28 2022-01-19 2021-04-04 2022-01-20 2022-04-04 2022-07-28 surance Mechanisms ant Selection teachers on internal quality a ssurance according to the Eu ropean standards MD-MOED-206019-CS-INDV / IC to develop the self-evaluat 1 – Improving the Quality As Individual Consult ion report of the NAQAER an IDA / 65420 Post Open 29,924.00 9,804.60 Signed 2021-01-04 2021-07-08 2021-04-05 2021-10-28 2021-04-26 2021-11-15 2021-05-31 2021-11-20 2022-05-31 surance Mechanisms ant Selection d to prepare beneficiaries for interviews with EQAR MD-MOED-206021-CS-INDV / 1 – Improving the Quality As Individual Consult IC to deliver trainings to the IDA / 65420 Post Open 10,687.00 0.00 Canceled 2022-08-01 2022-11-07 2022-11-28 2023-01-02 2023-03-31 surance Mechanisms ant Selection MoECR's and NAQAER's staff MD-MOED-206025-CS-INDV / IC to develop ToR for e-Admi ssion System and to assist in 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 53,898.00 32,338.84 Signed 2021-04-01 2021-06-14 2021-07-05 2021-10-22 2021-07-26 2021-11-22 2021-09-01 2021-11-27 2023-12-29 managing the system develo surance Mechanisms ant Selection pment and implementation a s well as in acceptance of the e-Admission system. MD-MOED-206056-CS-INDV / Develop ToR for the HEMIS a 1 – Improving the Quality As Individual Consult nd to assist in managing the IDA / 65420 Post Open 104,431.00 14,380.08 Signed 2021-04-01 2021-07-09 2021-07-06 2021-10-26 2021-07-27 2021-11-15 2021-09-02 2021-11-16 2023-12-30 surance Mechanisms ant Selection HEMIS Development and Imp lementation and in HEMIS ac ceptance MD-MOED-206070-CS-INDV / 1 – Improving the Quality As Individual Consult Pending Impleme International consultant to de IDA / 65420 Post Open 53,436.00 0.00 2022-01-03 2022-04-05 2022-04-26 2022-06-01 2023-06-30 surance Mechanisms ant Selection ntation liver trainings to the NEA in d ata analysis MD-MOED-206071-CS-INDV / International expert for techn 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 240,462.00 0.00 Canceled 2021-06-01 2021-09-05 2021-09-26 2021-11-01 2022-11-30 ical assistance for designing surance Mechanisms ant Selection and implementing the Gradu ate Tracer Study MD-MOED-206090-CS-INDV / International Consultant for p 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 251,366.00 34,662.62 Completed 2020-11-23 2021-03-26 2021-02-09 2021-06-16 2021-03-02 2021-06-28 2021-04-06 2021-07-23 2022-04-29 2022-10-06 iloting and Adjusting the New surance Mechanisms ant Selection Financing Mechanism MD-MOED-206091-CS-INDV / Local Consultant to assist the 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 120,000.00 13,361.00 Completed 2020-11-23 2021-03-22 2021-02-09 2021-06-16 2021-03-02 2021-07-01 2021-04-06 2021-07-23 2022-04-29 2022-10-08 International expert in pilotin surance Mechanisms ant Selection g and adjusting the new fina ncing mechanism Page 3 MD-MOED-206098-CS-INDV / Individual consultant to moni 1 – Improving the Quality As Individual Consult Pending Impleme tor and assess the Implemen IDA / 65420 Post Open 106,872.00 0.00 2023-01-02 2023-04-06 2023-04-27 2023-06-01 2024-08-30 surance Mechanisms ant Selection ntation tation of the New Financing Mechanism for Course Correc tion. MD-MOED-206316-CS-INDV / 2 – Improving the Labor Mar Individual Consultant to provi Individual Consult IDA / 65420 ket Orientation through Targ Post Open 2,400.00 1,755.22 Completed 2021-01-01 2021-06-14 2021-05-06 2021-11-17 2021-05-27 2021-11-17 2021-07-01 2021-11-18 2021-10-31 2021-12-21 de support to potential benef ant Selection eted Interventions iciaries in filling a presentatio n of project proposals MD-MOED-206317-CS-INDV / 2 – Improving the Labor Mar Two consultants for evaluatio Individual Consult IDA / 65420 ket Orientation through Targ Post Open 17,280.00 2,934.71 Signed 2021-10-01 2021-11-16 2022-02-03 2022-02-22 2022-02-24 2022-03-16 2022-03-31 2022-03-31 2022-06-30 n of the proposals based on f ant Selection eted Interventions our eyes principle in enginee ring area MD-MOED-206318-CS-INDV / 2 – Improving the Labor Mar Two consultants for evaluatio Individual Consult IDA / 65420 ket Orientation through Targ Post Open 17,280.00 3,790.37 Signed 2021-10-01 2021-11-16 2022-02-03 2022-03-10 2022-02-24 2022-03-16 2022-03-31 2022-03-17 2022-06-30 n of the proposals based on f ant Selection eted Interventions our eyes principle in IT area MD-MOED-206319-CS-INDV / 2 – Improving the Labor Mar Two consultants for evaluatio Individual Consult IDA / 65420 ket Orientation through Targ Post Open 17,280.00 1,000.00 Signed 2021-10-01 2021-11-16 2022-02-03 2022-03-10 2022-02-24 2022-03-16 2022-03-31 2022-03-17 2022-06-30 n of the proposals based on f ant Selection eted Interventions our eyes principle in medicin e area MD-MOED-206320-CS-INDV / 2 – Improving the Labor Mar Two consultants for evaluatio Individual Consult IDA / 65420 ket Orientation through Targ Post Open 17,280.00 4,262.38 Signed 2021-10-01 2021-11-16 2022-02-03 2022-03-10 2022-02-24 2022-03-15 2022-03-31 2022-03-17 2022-06-30 n of the proposals based on f ant Selection eted Interventions our eyes principle in pedagog ical area MD-MOED-206321-CS-INDV / 2 – Improving the Labor Mar Finacial Management Special Individual Consult IDA / 65420 ket Orientation through Targ Post Open 100,440.00 20,485.40 Terminated 2020-12-01 2021-05-04 2021-04-05 2021-06-24 2021-04-26 2021-06-28 2021-05-31 2021-07-20 2025-12-31 ist to provide fiduciary suppo ant Selection eted Interventions rt in implementation of the H EIP Sub-Projects MD-MOED-206322-CS-INDV / 2 – Improving the Labor Mar Procurement Specialist to pro Individual Consult IDA / 65420 ket Orientation through Targ Post Open 100,440.00 20,485.40 Terminated 2020-12-01 2021-05-04 2021-04-05 2021-06-24 2021-04-26 2021-05-31 2021-07-23 2025-12-31 vide fiduciary support in impl ant Selection eted Interventions ementation of the HEIP Sub-P rojects MD-MOED-206329-CS-INDV / PR and Comunication consult 2 – Improving the Labor Mar Individual Consult ant for elaboration of the co IDA / 65420 ket Orientation through Targ Post Open 108,000.00 718.45 Terminated 2020-12-01 2021-12-14 2021-04-05 2022-01-27 2021-04-26 2022-07-20 2021-05-31 2022-02-01 2025-12-31 ant Selection munication strategy and pres eted Interventions s releases during the project implementation MD-MOED-206335-CS-INDV / Individual consultant to provi 2 – Improving the Labor Mar Individual Consult de assistance for adapting or IDA / 65420 ket Orientation through Targ Post Open 69,467.00 0.00 Canceled 2020-11-30 2021-02-15 2021-03-05 2021-03-26 2021-04-30 2025-12-31 ant Selection developing a tool for engagin eted Interventions g stakeholders in the HEIP MD-MOED-206403-CS-INDV / Individual Consult Administrative assistant for t IDA / 65420 3 – Project Management Post Open 92,910.00 1,132.40 Completed 2020-12-01 2021-07-30 2021-01-19 2021-10-15 2021-02-09 2021-10-29 2021-03-16 2021-11-13 2025-12-31 2022-12-10 ant Selection he MHEP PMT MD-MOED-206736-CS-INDV / 1 – Improving the Quality As Individual Consult Assistance of the MoECR in t IDA / 65420 Post Open 100,460.00 23,605.86 Completed 2020-11-26 2021-02-15 2021-02-08 2021-06-16 2021-03-01 2021-08-12 2021-04-05 2021-08-27 2025-10-31 2022-09-08 surance Mechanisms ant Selection he development of NQF MD-MOED-206737-CS-INDV / Assistance in carrying out th 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 100,460.00 0.00 Canceled 2020-11-26 2021-02-15 2021-02-08 2021-03-01 2021-04-05 2025-10-31 e activities related to the ela surance Mechanisms ant Selection boration of the qualification s tandards MD-MOED-206405-CS-CDS / IT Specialist to assist the Mo IDA / 65420 3 – Project Management Post Direct Selection Direct 104,400.00 29,684.99 Signed 2020-12-01 2021-01-26 2020-12-11 2021-02-04 2021-02-14 2021-04-16 2025-12-31 ECR with the development a nd implementation of all IT s ystems under MHEP MHEP/CS/SSS-04 / M&E spec IDA / 65420 3 – Project Management Post Direct Selection Direct 118,914.00 22,413.26 Signed 2020-11-25 2020-08-12 2020-11-27 2020-09-09 2020-11-30 2020-09-10 2025-12-31 ialist for MHEP PMT MHEP/CS/SSS-03 / Financial IDA / 65420 3 – Project Management Post Direct Selection Direct 131,604.00 29,540.71 Completed 2020-11-25 2020-08-12 2020-11-27 2020-09-07 2020-11-30 2020-09-12 2025-10-22 2023-04-30 Management Specialist of th e MHEP PMT MHEP/CS/IC-03 / Social and Individual Consult Environmental specialist for t IDA / 65420 3 – Project Management Post Open 104,052.00 27,261.32 Signed 2020-11-25 2020-08-12 2020-11-28 2020-09-08 2020-11-29 2020-09-11 2020-12-01 2020-09-15 2025-12-31 ant Selection he MHEP PMT MHEP/CS/SSS-02 / Procurem IDA / 65420 3 – Project Management Post Direct Selection Direct 163,026.00 31,292.79 Signed 2020-11-25 2020-08-12 2020-11-27 2020-09-07 2020-11-30 2020-09-09 2025-12-31 ent Specialist of the MHEP P MT MHEP/CS/IC-01 / HEIP Officer Individual Consult IDA / 65420 3 – Project Management Post Open 118,914.00 18,478.42 Terminated 2020-11-25 2020-08-12 2020-11-28 2020-09-08 2020-11-29 2020-09-11 2020-12-01 2020-09-15 2025-12-31 for the MHEP PMT ant Selection MHEP/CS/SSS-01 / Project Co IDA / 65420 3 – Project Management Post Direct Selection Direct 170,142.00 33,726.36 Signed 2020-11-25 2020-08-12 2020-11-27 2020-09-07 2020-11-30 2020-09-09 2025-12-31 ordinator of the MHEP PMT MD-MOED-242591-CS-CDS / National Institute for Econom 1 – Improving the Quality As ic Research of Moldova to co IDA / 65420 Post Direct Selection Direct 732,073.00 290,579.16 Signed 2021-07-15 2021-07-28 2021-07-25 2021-08-13 2021-09-28 2021-12-15 2024-03-29 surance Mechanisms nduct the Graduate Tracer St udy based on Single Source Selection MD-MOED-243664-CS-INDV / International Individual consu ltant for elaboration of the Te 1 – Improving the Quality As Individual Consult rms of Reference for develop IDA / 65420 Post Open 144,980.00 47,363.61 Signed 2021-07-20 2021-08-04 2021-08-22 2022-01-21 2021-09-12 2022-03-04 2021-09-25 2022-03-05 2024-01-22 surance Mechanisms ant Selection ment of the Labor Managem ent Information System (LMIS ), managing system develop ment and acceptance. MD-MOED-243666-CS-INDV / National Individual Consultan t for elaboration of the Terms 1 – Improving the Quality As Individual Consult of Reference for developmen IDA / 65420 Post Open 144,980.00 16,320.00 Signed 2021-07-20 2021-08-04 2021-08-22 2022-01-21 2021-09-12 2022-03-04 2021-09-25 2022-03-16 2024-01-22 surance Mechanisms ant Selection t of the Labor Management I nformation System (LMIS), m anaging system developmen t and acceptance. Page 4 MD-MOED-253738-CS-INDV / 2 – Improving the Labor Mar Finacial Management Special Individual Consult IDA / 65420 ket Orientation through Targ Post Open 100,440.00 1,528.74 Signed 2021-09-20 2021-09-21 2021-11-04 2021-11-17 2021-11-25 2021-11-17 2021-12-15 2021-11-02 2025-12-31 ist to provide fiduciary suppo ant Selection eted Interventions rt in implementation of the H EIP Sub-Projects MD-MOED-206740-CS-INDV / 1 – Improving the Quality As Individual Consult Individual consultant to assis IDA / 65420 Post Open 133,590.00 0.00 Canceled 2020-11-26 2021-02-15 2021-02-08 2021-03-01 2021-04-05 2025-03-31 surance Mechanisms ant Selection t in the management of the NQR MD-MOED-206740-CS-INDV- 1 – Improving the Quality As Individual Consult 2 / Individual consultant to as IDA / 65420 Post Open 133,590.00 0.00 Canceled 2021-11-04 2021-11-16 2021-12-03 2022-02-01 2021-12-04 2021-12-18 2025-03-31 surance Mechanisms ant Selection sist in the management of th e NQR MD-MOED-206093-CS-INDV / Individual consultant to devel op guidelines for the new fin 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 267,180.00 0.00 Canceled 2022-02-01 2022-05-06 2022-05-27 2022-07-01 2023-07-31 ancing mechanism and to del surance Mechanisms ant Selection iver trainings for the Implem entation of the New Financin g Mechanism MD-MOED-205732-CS-CDS / Technical assistance for the 1 – Improving the Quality As Under Implement IDA / 65420 Post Direct Selection Direct 111,146.00 0.00 2021-11-10 2022-11-11 2022-01-05 2022-11-25 2022-02-28 2023-12-24 maintenance of the National surance Mechanisms ation Qualifications Register (NQR) MD-MOED-268920-CS-INDV / Two consultants for evaluatio 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 17,280.00 4,746.00 Signed 2021-12-17 2021-12-17 2022-02-04 2022-03-09 2022-02-25 2022-03-16 2022-04-01 2022-03-17 2022-09-28 n of the PC proposals based surance Mechanisms ant Selection on four eyes principle in ped agogical area MD-MOED-274192-CS-INDV / Individual Consult IDA / 65420 3 – Project Management Post Open 82,300.00 0.00 Signed 2022-01-24 2022-01-24 2022-02-25 2022-04-06 2022-02-26 2022-04-08 2022-03-01 2025-12-31 HEIP Officer for the MHEP PM ant Selection T MD-MOED-274505-CS-INDV / Individual consultant to provi 2 – Improving the Labor Mar Individual Consult de assistance for adapting or IDA / 65420 ket Orientation through Targ Post Open 69,467.00 7,648.50 Terminated 2022-01-28 2022-01-31 2022-03-18 2022-04-04 2022-04-08 2022-04-08 2022-05-13 2022-04-13 2022-11-09 ant Selection developing a tool for engagin eted Interventions g stakeholders in the HEIP (P art-time) MD-MOED-206740-CS-INDV- 2-2 / Individual consultant to 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open 133,590.00 0.00 Signed 2022-03-31 2022-05-11 2022-04-29 2022-06-21 2022-04-30 2022-08-15 2022-05-14 2025-12-31 assist in the management of surance Mechanisms ant Selection the National Qualifications R egister MD-MOED-206322-CS-INDV- 2 – Improving the Labor Mar 2 / Procurement Consultant Individual Consult IDA / 65420 ket Orientation through Targ Prior Open 80,000.00 0.00 Signed 2022-07-07 2022-07-14 2022-08-05 2022-08-19 2022-08-09 2022-09-18 2022-08-15 2025-12-31 within Higher Education Impr ant Selection eted Interventions ovement Program (HEIP) MD-MOED-303116-CS-INDV / Procurement Consultant to a 2 – Improving the Labor Mar Individual Consult ssist the Project Managemen IDA / 65420 ket Orientation through Targ Prior Direct 28,000.00 8,408.40 Signed 2022-07-11 2022-07-14 2022-07-12 2022-07-25 2022-07-14 2022-07-25 2022-07-18 2022-08-02 2025-09-30 ant Selection t Team in procurement activi eted Interventions ties related to „Moldova High er Education” Project MD-MOED-305913-CS-INDV / PR and Comunication consult 2 – Improving the Labor Mar Individual Consult ant for elaboration of the co IDA / 65420 ket Orientation through Targ Post Open - National 79,500.00 0.00 Canceled 2022-07-26 2022-07-29 2022-08-17 2022-10-04 2022-09-01 2022-11-29 2022-09-01 2023-08-31 ant Selection munication strategy and pres eted Interventions s releases during the project implementation MD-MOED-324864-CS-INDV / Individual Consult Financial Management Speci IDA / 65420 3 – Project Management Post Open - National 83,000.00 0.00 Signed 2022-11-04 2022-11-07 2022-12-02 2022-12-07 2022-12-09 2022-12-14 2022-12-18 2023-12-31 ant Selection alist of the MHEP PMT MD-MOED-330206-CS-CDS / Financial audit of the Moldov IDA / 65420 3 – Project Management Post Direct Selection Direct - National 29,500.00 0.00 Signed 2023-01-16 2022-12-16 2023-01-26 2023-01-20 2023-04-03 2023-05-31 a Higher Education Project fo r year 2022 MD-MOED-305913-CS-INDV- 2 – Improving the Labor Mar Individual Consult Under Implement 2 / Full-time communication IDA / 65420 ket Orientation through Targ Post Open - National 68,000.00 0.00 2023-02-02 2023-02-08 2023-02-26 2023-03-03 2023-03-20 2025-12-31 ant Selection ation consultant under MHEP eted Interventions MD-MOED-325397-CS-INDV / Individual Consultant for assi 1 – Improving the Quality As Individual Consult IDA / 65420 Post Open - National 140,000.00 0.00 Canceled 2022-11-11 2022-11-23 2022-12-16 2023-03-06 2022-12-23 2022-12-25 2023-12-31 stance of the MoECR in the d surance Mechanisms ant Selection evelopment of NQF MD-MOED-356532-CS-INDV / 2 – Improving the Labor Mar Individual Consult Stakeholders’ Engagement In IDA / 65420 ket Orientation through Targ Post Direct - National 40,000.00 0.00 Signed 2023-04-14 2023-04-28 2023-04-18 2023-05-02 2023-04-21 2023-05-04 2023-04-26 2025-12-31 ant Selection dividual Consultant eted Interventions MD-MOED-312113-CS-INDV / Individual consultant to provi 2 – Improving the Labor Mar Individual Consult de assistance for adapting or IDA / 65420 ket Orientation through Targ Post Open - National 57,000.00 0.00 Canceled 2022-08-30 2023-04-05 2022-09-21 2022-09-28 2022-09-30 2023-09-30 ant Selection developing a tool for engagin eted Interventions g stakeholders in the HEIP (P art-time) MD-MOED-324867-CS-INDV / Administrative Assistance/loc Individual Consult al education consultant to su IDA / 65420 3 – Project Management Post Open - National 48,500.00 0.00 Canceled 2022-11-04 2022-11-07 2022-12-02 2022-12-09 2022-12-18 2023-12-31 ant Selection pport MoER and Project Mana gement Team under MHEP MD-MOED-359153-CS-CDS / 1 – Improving the Quality As Expanding the online admissi IDA / 65420 Post Direct Selection Direct - National 90,000.00 0.00 Under Review 2023-05-22 2023-05-31 2023-06-01 2023-08-05 2025-12-31 surance Mechanisms on module (e-admission) nati onwide MD-MOED-359134-CS-INDV / Administrative Assistance to Individual Consult Under Implement IDA / 65420 3 – Project Management Post Open - National 24,250.00 0.00 2023-05-05 2023-05-23 2023-06-02 2023-06-09 2023-06-18 2024-06-30 support MoER and Project Ma ant Selection ation nagement Team under MHEP MD-MOED-359135-CS-INDV / Local education consultant to Individual Consult Under Implement IDA / 65420 3 – Project Management Post Open - National 24,250.00 0.00 2023-05-05 2023-05-23 2023-06-02 2023-06-09 2023-06-18 2024-06-30 support MoER and Project Ma ant Selection ation nagement Team under MHEP Page 5 Plan de Passation de marchés I. Généralités 1. Information sur le projet : Pays : Madagascar ; Emprunteur : République de Madagascar ; Nom de projet : Projet d’Appui à la Gouvernance Digitale et aux Réformes de l’Etat Civil et de l’Identification (PRODIGY) Numéro du Crédit : PPA N°V2950 Agence d’exécution du Projet : UEP PRODIGY 2. Date d’approbation du Plan de passation de marchés par la Banque :  Approbation initiale :  Mise à jour : 3. Date de notification du Plan Général de Passation de marchés : - - 4. Période couverte par le Plan de Passation de marchés : Année 2020 II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable : Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le paragraphe 3.1 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) et sur la base de l'évaluation de la capacité de l'agence d’exécution : Seuil de Méthode de Passation de revue à Commentaires marchés priori 1. AOI – Ouvert ou Restreint 2 000 000 Les montants (Biens) estimatifs des 2. AON (Biens) 2 000 000 marchés prévus 3. AOI (Travaux) 10 000 000 sont au-dessous 4. AON (Travaux) 10 000 000 des seuils. 5. AOI (Services) 2 000 000 Niveau de 6. UN -UNOPS (Biens) 2 000 000 risque : 7. ED (Biens/Travaux) 2 000 000 « SUBSTANTIEL » 2. Pré-qualification : selon les dispositions des paragraphes 6.19 à 6.24 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016). 3. Procédures proposées pour les composantes CDD (selon le paragraphe. 6.52 et 6.53 de la Section VI du Règlement de Passation des 1 Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016). 4. Référence (s’il y en a) au Manuel d’exécution du projet/ Manuel de Passation de marchés. 5. Tout autre arrangement spécial en passation de marchés : non applicable. 2 6. Allotissement de fournitures avec méthodes et calendrier : Date de Méthode Montant Préférence reception DATE Code Réf. Description du Approch de Revue de estimati nationale des CONTRA marché PTBA cotrat e sélectio la Banque f en USD (Oui/Non) specification T n s techniques C2 Amélioration des Services Publics PRODIGY- Achat PPA.21 PPA-219- d’equipements 96 000 National RFQ Non 06-avr 11-mai 9 GO-RFQ IT PRODIGY- Achat de PPA.22 PPA-220- mobiliers de 20 000 National RFQ Non 06-avr 11-mai 0 GO-RFQ bureau C4: Mise en œuvre du projet, suivi & évaluation, sauvegardes et évaluation d’impacts PRODIGY- Logiciel de PPA.40 30/04/20 PPA-407- comptabilité 4 500 National ED Non 06-avr 7 20 GO-DIR TOMPRO PRODIGY- PPA.40 Mobiliers de PPA-409- 3 000 National RFQ Non 06-avr 11-mai 9 bureau GO-DIR 123 50 Coût Total fourniture 0 3 III. Sélection de consultants 1. Seuil de Revue Préalable : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans le paragraphe 3 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) : Méthode de sélection Seuil de Commentaires revue à priori 1. Méthode compétitive (firmes) 1 000 000 Les montants 2. Entente directe (firmes) 1 000 000 estimatifs des 3. Méthode compétitive (Consultant 300 000 contrats prévus individuel) sont au-dessous 4. Entente directe (Consultant 300 000 des seuils. individuel) Niveau de risque : « SUBSTANTIEL » 2. Liste restreinte composée entièrement de consultants nationaux : Liste restreinte de consultants pour prestations de services, estimés à moins de USD 150 000par contrat, peut comporter entièrement des consultants nationaux selon les dispositions du paragraphe 7.25 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016). 3. Tout autre arrangement spécial de Sélection de consultants. 4 5. Tâches de consultation avec des méthodes de sélection et calendrier Revu Coût e de DATE Réf. estima Approch Mod Forfait/tem DATE Code marché Description la DATE AMI CONTRA PTBA tif en e e ps passé TdR Banq T USD ue C 1: Mise en place d'un système consolidé de gestion des identités Réalisation d'une analyse PRODIGY-PPA- PPA.1 institutionnelle, organisationelle et Internatio QCB 437 500 Post Forfait 05-mai 11-mai 19-août 102-CS-QCBS 02 des procédures de gestion de nal S l'identité à Madagascar Assistance juridique sur la Post Forfait PRODIGY-PPA- PPA.1 transformation des services publics Internatio QCB 135 000 21-avr 27-avr 05-août 103-CS-QCBS 03 (y compris état civil et gouvernance nal S digitale) Recrutement de consultants pour Forfait PRODIGY-PPA- PPA.1 Internatio l'appui au développement de 80 000 CI Post 30-avr 05-mai 04-juin 104-CS-CI 04 nal Leadership C2 Amélioration des Services Publics PRODIGY-PPA- PPA.2 Temps Recrutement Product Owner 20 000 National CI Post 03-avr N/A 30-avr 201-CS-CI 01 passé PRODIGY-PPA- PPA.2 Recrutement Architecte Temps 18 000 National CI Post 03-avr N/A 30-avr 202-CS-CI 02 Urbaniste/Securité Infra & Data passé PRODIGY-PPA- PPA.2 Recrutement Services Numériques - Temps 16 000 National CI Post 03-avr N/A 8-May 203-CS-CI 03 Directeur des technologies passé PRODIGY-PPA- PPA.2 Temps Recrutement Content Designer 6 000 National CI Post 16-avr N/A 16-May 204-CS-CI 04 passé PRODIGY-PPA- PPA.2 Temps Recrutement Designer UX/UI 8 500 National CI Post 03-avr N/A 8-May 205-CS-CI 05 passé PRODIGY-PPA- PPA.2 Temps Recrutement developpeur 1 12 000 National CI Post 03-avr N/A 30-avr 206-CS-CI 06 passé PRODIGY-PPA- PPA.2 Temps Recrutement dev 2 12 000 National CI Post 03-avr N/A 8-May 207-CS-CI 07 passé PRODIGY-PPA- PPA.2 Recrutement Assistant a maitrise Temps 15 000 National CI Post 03-avr N/A 30-avr 208-CS-CI 08 d'ouvrage (user reseqrcher) 1 passé 5 PRODIGY-PPA- PPA.2 Recrutement Assistant a maitrise Temps 15 000 National CI Post 16-avr N/A 16-May 209-CS-CI 09 d'ouvrage (user reseqrcher) 2 passé PRODIGY-PPA- PPA.2 Temps Recrutement Architecte Technique 31 000 National CI Post 03-avr N/A 30-avr 210-CS-CI 10 passé Revu Coût e de DATE Réf. estima Approch Mod Forfait/tem DATE Code marché Description la DATE AMI CONTRA PTBA tif en e e ps passé TdR Banq T USD ue PRODIGY-PPA- PPA.2 Recrutement Agile Delivery/ Scrum Temps 28 000 National CI Post 03-avr N/A 11-May 211-CS-CI 11 master passé PRODIGY-PPA- PPA.2 Recrutement Administrateur de Temps 2 800 National CI Post 16-avr N/A 16-May 212-CS-CI 12 base de donnees passé PRODIGY-PPA- PPA.2 Temps Recrutement formateur 12 100 National CI Post 20-avr N/A 20-May 213-CS-CI 13 passé PRODIGY-PPA- PPA.2 Recrutement Engagement Lead Temps 6 700 National CI Post 09-avr N/A 11-May 214-CS-CI 14 (Gouvernement) passé Recrutement Engagement Lead Temps PRODIGY-PPA- PPA.2 (secteur privé, société civile, 2 300 National CI Post passé 09-avr N/A 11-May 215-CS-CI 15 université) PRODIGY-PPA- PPA.2 Recrutement Engagement lead Temps 1 100 National CI Post 09-avr N/A 11-May 216-CS-CI 16 (M&E) passé PRODIGY-PPA- PPA.2 Recrutement Agile Communications Temps 900 National CI Post 20-avr N/A 29-May 217-CS-CI 17 Lead passé PRODIGY-PPA- PPA.2 Recrutement Digital Academy Lead Temps 1 100 National CI Post 20-avr N/A 29-May 218-CS-CI 18 (training) passé PRODIGY-PPA- PPA.2 Recrutement User research on Temps 22 118 National CI Post 07-mai N/A 6-Jun 221-CS-CI 21 priority topic 1 / études passé PRODIGY-PPA- PPA.2 Recrutement User research on Temps 11 059 National CI Post 07-mai N/A 6-Jun 222-CS-CI 22 priority topic 2 passé PRODIGY-PPA- PPA.2 Recrutement User research on Temps 11 059 National CI Post 07-mai N/A 6-Jun 223-CS-CI 23 priority topic 3 passé PRODIGY-PPA- PPA.2 Recrutement Etudes et analyses Temps 16 588 National CI Post 07-mai N/A 07-mai 224-CS-CI 24 sur l'e-gouvernance passé PRODIGY-PPA- PPA.2 Recrutement Assistant(e) de Temps 3 871 National CI Post 14-avr N/A 14-May 225-CS-CI 25 Direction passé PRODIGY-PPA- PPA.2 Recrutement responsable Temps 5 806 National CI Post 14-mai 18-May 17-Jun 226-CS-CI 26 opérations back office passé 6 PRODIGY-PPA- PPA.2 Temps Recrutement coursier 829 National CI Post 21-avr N/A 21-May 227-CS-CI 27 passé PRODIGY-PPA- PPA.2 Recrutement technologies Temps 4 147 National CI Post 20-mai NA 19 juin 228-CS-CI 28 informatiques internes passé Recrutement assistant(e) Temps PRODIGY-PPA- PPA.2 adminstratif(ve), logistique et 553 National CI Post passé 14-avr N/A 14-May 229-CS-CI 29 comptable Revu Coût e de DATE Réf. estima Approch Mod Forfait/tem DATE Code marché Description la DATE AMI CONTRA PTBA tif en e e ps passé TdR Banq T USD ue PRODIGY-PPA- PPA.2 Temps Recrutement agents de surfaces 968 National CI Post 14-avr N/A 14-May 230-CS-CI 30 passé PRODIGY-PPA- PPA.2 Etude de faisabilité pour la Internatio QCB 80 000 Post Forfait 04-mai 11-mai 19-août 238-CS-QCBS 38 digitalisation du foncier nal S Assistance technique juridique en Forfait PRODIGY-PPA- PPA.2 appui aux réformes légales et 100 000 National QC Post 15-avr 20-avr 30-mai 241-CS-QC 41 réglementaires pour la transformation digitale (firme) Assistance technique à la Forfait transformation digitale, et notamment appui à l'unité de PRODIGY-PPA- PPA.2 Internatio QCB gouvernance numérique, la 612 000 Post 15-avr 20-avr 29-juil 242-CS-QCBS 42 nal S passation de marché agile, et la digitalisation de l'enregistrement des entreprises au sein d'EDBM C3: Appui à l’économie numérique Évaluation des besoins pour PRODIGY-PPA- PPA.3 Internatio QCB renforcer la base de compétences 50 000 Post Forfait 07-mai 12-mai 20-août 301-CS-QCBS 01 nal S numériques à Madagascar Analyse des opportunités pour répondre aux contraintes PRODIGY-PPA- PPA.3 QCB auxquelles font face les start-ups et 50 000 National Post Forfait 07-mai 12-mai 20-août 302-CS-QCBS 02 S les PME évoluant dans la sphère de l’économie numérique 7 Étude sur la réforme du système de paiement et d'éxecution des dépenses publiques afin de réduire PRODIGY-PPA- PPA.3 QCB les risques associés aux non- 100 000 National Post Forfait 07-mai 12-mai 20-août 303-CS-QCBS 03 S paiements des fournisseurs (notamment en lien avec le secteur du numérique) Etude sur la mise en place d'un système de garanties pour le PRODIGY-PPA- PPA.3 QCB paiement de biens et services 50 000 National Post Forfait 11-mai 15-mai 24-août 304-CS-QCBS 04 S numériques dans le cadre du projet PRODIGY Etude sur l'entrepreneuriat PRODIGY-PPA- PPA.3 QCB numérique (financement et 50 000 National Post Forfait 11-mai 15-mai 24-août 305-CS-QCBS 05 S intermediaire) Enquête approfondie sur les PRODIGY-PPA- PPA.3 QCB établissements (instructeurs) 100 000 National Post Forfait 11-mai 15-mai 24-août 306-CS-QCBS 06 S d’ingénieurs logiciels Revu Coût e de DATE Réf. estima Approch Mod Forfait/tem DATE Code marché Description la DATE AMI CONTRA PTBA tif en e e ps passé TdR Banq T USD ue Etude sur la connectivité du PRODIGY-PPA- PPA.3 QCB gouvernement central (couts, 100 000 National Post Forfait 15-mai 18-mai 26-août 307-CS-QCBS 07 S infrastructure, équipment) AT au Ministère des Postes, Télécommunication et DevE PRODIGY-PPA- PPA.3 Numérique sur la régulation du 100 000 National QC Post Forfait 15-mai 18-mai 24-juin 308-CS-QC 08 secteur télécom, et le pilotage de smart village C4: Mise en œuvre du projet, suivi & évaluation, sauvegardes et évaluation d’impacts Recrutement d'un spécialiste en PRODIGY-PPA- PPA.4 état civil et gestion de l'identité 30 000 National CI Post Temp passé 14-avr 20-avr 20-mai 401-CS-CI 01 pour l'Unité de gestion du projet PRODIGY-PPA- PPA.4 Recrutement d'un Responsable de 5 300 National CI Post Temp passé 17-févr NA 17-févr 402-CS-CI 02 la Passation de Marchés 8 PRODIGY-PPA- PPA.4 Recrutement d'un Assistant en 5 000 National CI Post Temp passé 06-avr NA 06-mai 403-CS-CI 03 Passation de Marchés PRODIGY-PPA- PPA.4 Recrutement d'un Responsible 5 900 National CI Post Temp passé 18-févr NA 18-févr 404-CS-CI 04 Administratif et Financier PRODIGY-PPA- PPA.4 Recrutement d'un Assistant 5 000 National CI Post Temp passé 06-avr NA 06-mai 405-CS-CI 05 comptable PRODIGY-PPA- PPA.4 Interim digital business manager 50 000 National CI Post Temp passé 05-mai 11-mai 10-juin 410-CS-CI 10 PRODIGY-PPA- PPA.4 Consultant rédaction du manuel de 10 000 National CI Post Temp passé 20-avr NA 20-mai 411-CS-CI 11 procédures PRODIGY-PPA- PPA.4 Assistant au coordonnateur 10 000 National CI Post Temp passé 28-avr NA 28-mai 412-CS-CI 12 PRODIGY PRODIGY-PPA- PPA.4 Audit 10 000 National SMC Post Forfait 29-mai NA 08-juil 413-CS-CI 13 PRODIGY- PPA.4 Recrutement d'un Temp PPA-414-CS- 6 000 National CI Post 06-avr NA 20-avr 14 Coordonnateur pour PRODIGY passé CI Coût Total Consultant 2 467 198 9 IV. Activités de renforcement de capacités de l’Agence d’exécution avec calendrier Dans cette section, les activités de renforcement de capacité acceptées (quelques articles pourraient être des recommandations de CPAR) sont énumérées avec le calendrier : Code marché. Réf Résultats escomptés Coût Durée Date de Commentair PPA / Description de estima estimat début es l’activité tif ive PRODIGY- PPA.1 Voyage d'étude au PPA-101- 50 000 02/06/20 01 Pérou et en Uruguay NCS PRODIGY- PPA.2 Voyage d'étude sur PPA-239- 50 000 29/06/20 39 l'e-procurement NCS Voyage d'étude sur PRODIGY- l'économie PPA.2 PPA-240- numériques pour les 50 000 25/05/20 40 NCS hauts responsables du gouvernement PRODIGY- Formations et ateliers PPA.4 11/05/20 PPA-406- (pour l'ensemble des 40 000 06 NCS composantes) TOTAL ATELIER ET FORMATION 190,00 0 10 PROCUREMENT Madagascar : Digital Governance and Identification Management System Project- PRODIGY PLAN General Information Country: Madagascar 2020-04-22 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P169413 GPN Date: Project Name: Digital Governance and Identification Management System Project- PRODIGY Loan / Credit No: IDA / V2950, IDA / 67800 Public Sector Performance Program Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MG-PREA-319207-CW-RFQ / Request for Quota Digital and Mobile Governm Request for Quota Single Stage - One E 2023-04-3 Aménagement de bâtiment a IDA / 67800 Post Open - National tions (Non Bank-S 73,500.00 0.00 Signed 2022-12-05 2022-12-15 2023-01-30 ent Services tions nvelope 0 dministratif PD) Request for Quota MG-PREA-330826-CW-RFQ / Project Management and Im Request for Quota Single Stage - One E 2023-05-2 IDA / 67800 Post Open - National tions (Non Bank-S 50,000.00 0.00 Signed 2023-01-01 2023-01-06 2023-02-26 Aménagement local UCP plementation tions nvelope 7 PD) MG-PREA-343340-CW-RFQ / Creation of a Consolidated a Request for Quota Réhabilitation et extension d Request for Quota Single Stage - One E Under Imple 2023-07-2 IDA / 67800 nd Interoperable Identity Ma Post Open - National tions (Non Bank-S 200,000.00 0.00 2023-03-05 2023-03-08 2023-04-30 es bâtiments administratifs d tions nvelope mentation 9 nagement System PD) u CNECI (y compris connectiv ité) MG-PREA-348780-CW-RFQ / Request for Quota Digital and Mobile Governm Request for Quota Single Stage - One E Under Imple 2023-06-0 Aménagement de bâtiment a IDA / 67800 Post Open - National tions (Non Bank-S 200,000.00 0.00 2023-03-25 2023-04-07 2023-05-07 ent Services tions nvelope mentation 6 dministratif PD) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PRODIGY-PPA-407-GO-DIR / Project Management and Im Acquisition de Logiciel de co IDA / V2950 Post Direct Selection Direct 4,500.00 5,337.79 Completed 2020-04-06 2020-03-06 2020-04-10 2020-03-30 2020-05-15 2020-05-21 2020-08-31 2020-06-24 plementation mptabilité TOMPRO pour le P RODIGY (PPA.407) PRODIGY-PPA-220-GO-RFQ / Achat de mobiliers de bureau Digital and Mobile Governm Request for Quota Single Stage - One E pour l'équipe de la Transform IDA / V2950 Post Limited 25,000.00 16,514.56 Signed 2020-04-30 2020-06-22 2020-05-27 2020-07-14 2020-06-08 ent Services tions nvelope ation Digitale et le PIU du PR ODIGY (PPA.220 et PPA 409) PRODIGY-PPA-219-1-GO-RFQ / Fourniture de dix (10) ordin ateurs portables destinés à l’ Digital and Mobile Governm Request for Quota Single Stage - One E IDA / V2950 Post Limited 20,000.00 17,006.01 Completed 2020-04-29 2020-04-29 2020-05-20 2020-05-20 2020-05-22 2020-06-24 Equipe de la Transformation ent Services tions nvelope Digitale dans le cadre de l’ap pui au Centre de Commande ment Opérationnel Covid-19 PRODIGY-PPA-219-2-GO-RFQ / Achat d'équipements IT pou r l'équipe de la Transformatio Digital and Mobile Governm Request for Quota Single Stage - One E IDA / V2950 Post Limited 126,000.00 19,588.54 Signed 2020-07-10 2020-09-09 2020-08-10 2020-12-03 2020-08-25 n Digitale et Achat de matéri ent Services tions nvelope els informatiques et techniqu es pour l’UTSP en neuf (09) l ots. PRODIGY-PPA-219-3-GO-RFQ / Achat d'équipements IT pou Digital and Mobile Governm Request for Quota Single Stage - One E IDA / V2950 Post Limited 13,800.00 0.00 Canceled 2020-10-15 2020-11-19 2020-12-09 r l'équipe de la Transformatio ent Services tions nvelope n Digitale. Relance Lot 5: 3 MacBooks PRODIGY-PPA-219-4-GO-RFQ / Achat d'équipements IT pou Digital and Mobile Governm Request for Quota Single Stage - One E IDA / V2950 Post Limited 95,000.00 93,600.08 Completed 2020-11-27 2021-01-14 2020-12-28 2021-03-26 2021-01-27 2021-10-09 r l'équipe de la Transformatio ent Services tions nvelope n Digitale en 6 lots. PRODIGY-PPA-220.2-GO-RFQ Digital and Mobile Governm Request for Quota Single Stage - One E / Achat de table et chaises d IDA / V2950 Post Limited 3,000.00 1,479.69 Signed 2020-11-26 2021-01-05 2020-12-24 2021-01-13 2020-12-29 ent Services tions nvelope e réunion pour l'UTSP PRODIGY-PPA-220-3-GO-RFQ Digital and Mobile Governm Request for Quota Single Stage - One E / Achat de mobiliers de burea IDA / V2950 Post Open - National 25,000.00 13,282.11 Completed 2021-03-30 2021-06-01 2021-06-17 2021-06-21 2021-07-27 ent Services tions nvelope u, répartis en 6 lots, pour l'U CP et la DGU PRODIGY-PPA-219-5-GO-RFQ Project Management and Im Request for Quota Single Stage - One E / Fourniture de matériels info IDA / V2950 Post Open - National 95,000.00 23,746.53 Signed 2021-03-26 2021-05-14 2021-07-02 2021-06-13 2021-10-19 plementation tions nvelope rmatiques, répartis en 4 lots, pour l'UCP PRODIGY-PPA-219-6-GO-RFQ / Fourniture de matériels tec Project Management and Im Request for Quota Single Stage - One E IDA / V2950 Post Open - National 55,000.00 44,468.23 Completed 2021-03-26 2021-05-07 2021-08-04 2021-06-06 2021-10-09 hniques et de bureau, réparti plementation tions nvelope s en 5 lots, pour l'UCP PRODIGY-PPA-440-GO-RFQ / Fourniture de 2 scanners de Project Management and Im Request for Quota Single Stage - One E IDA / V2950 Post Open - National 19,000.00 96.67 Signed 2021-05-03 2021-06-28 2021-08-18 2021-07-28 codes-barres QR avec imprim plementation tions nvelope antes et accessoires pour l'U CP PRODIGY-PPA-442-GO-RFQ / Creation of a Consolidated a Acquisition d'appareils électr Request for Quota Single Stage - One E IDA / V2950 nd Interoperable Identity Ma Post Open - National 6,000.00 3,271.50 Signed 2021-06-02 2021-07-16 2021-09-07 2021-08-15 2021-10-08 oménager et d'ustensiles de tions nvelope nagement System cuisine pour l'UCP et le DGU PRODIGY-PPA-219-7-GO-RFQ Digital and Mobile Governm Request for Quota Single Stage - One E / Fourniture de matériels info IDA / 67800 Post Open - National 60,000.00 64,283.81 Signed 2021-07-12 2021-08-30 2021-10-12 2021-09-29 2021-12-31 ent Services tions nvelope rmatiques pour l l'UCP et l'U GD PRODIGY-PPA-446-GO-RFQ / Project Management and Im Request for Quota Single Stage - One E Acquisition de 40 smartphon IDA / 67800 Post Open - National 35,000.00 56,470.65 Signed 2021-07-26 2021-09-15 2021-11-13 2021-10-15 2021-12-28 plementation tions nvelope es pour l'UCP-PRODIGY et l'U GD Page 1 PRODIGY-F002-GO-RFB / Acq Creation of a Consolidated a Open - Internationa Single Stage - One E uisition de mobiliers de bure IDA / V2950 nd Interoperable Identity Ma Prior Request for Bids 3,570,000.00 0.00 Canceled 2021-05-10 2021-05-17 2021-07-01 2021-08-02 2021-09-06 2021-12-05 l nvelope au nagement System PRODIGY-F005-GO-RFB / Ach Creation of a Consolidated a at de consommables informa Single Stage - One E IDA / V2950 nd Interoperable Identity Ma Post Request for Bids Open - National 220,000.00 0.00 Canceled 2021-09-06 2021-09-13 2021-10-11 2021-11-10 2021-12-15 2022-02-13 tiques pour l’opérationnalisat nvelope nagement System ion du système de gestion de l’identité PRODIGY-F011-GO-RFQ / Ac Creation of a Consolidated a hat de fournitures de bureau Request for Quota Single Stage - One E IDA / V2950 nd Interoperable Identity Ma Post Limited 20,000.00 0.00 Canceled 2021-05-17 2021-07-12 2021-09-10 pour l’opérationnalisation du tions nvelope nagement System système de gestion de l’ident ité et de l’état civil PRODIGY-2.01.02.21-1-GO-R FB / Acquisition de matériels Digital and Mobile Governm Single Stage - One E informatiques pour la mise e IDA / 67800 Post Request for Bids Open - National 400,000.00 336,036.44 Signed 2021-11-15 2022-01-19 2021-11-22 2022-01-20 2021-12-22 2022-03-01 2022-01-19 2022-03-25 2022-02-16 2022-05-18 2022-04-17 ent Services nvelope n place de l'infrastructure po ur interopérabilité avec X-Rro ad PRODIGY-2.01.02.21-2-GO-D IR / Acquisition de serveur d' Digital and Mobile Governm IDA / 67800 Post Direct Selection Direct 630,000.00 448,182.68 Signed 2021-11-25 2021-12-13 2021-12-09 2021-12-16 2022-01-06 2022-03-29 2022-03-07 autorité de certification et d' ent Services horodatage et de signature PRODIGY-F002-2-GO-RFB / A Creation of a Consolidated a Single Stage - One E Under Imple cquisition de matériels et mo IDA / 67800 nd Interoperable Identity Ma Prior Request for Bids Open - National 3,570,000.00 0.00 2022-04-18 2022-12-19 2022-04-23 2023-04-06 2022-06-04 2023-05-26 2022-07-04 2022-08-08 2022-11-06 nvelope mentation biliers de bureau nagement System PRODIGY-F009-GO-RFB / Acq Creation of a Consolidated a Open - Internationa Single Stage - One E Pending Impl uisition de valisettes pour l'e IDA / 67800 nd Interoperable Identity Ma Post Request for Bids 560,000.00 0.00 2022-03-18 2022-03-23 2022-05-04 2022-06-03 2022-07-08 2022-10-06 l nvelope ementation nregistrement mobile-Etat Ci nagement System vil PRODIGY-272372-GO-RFB / F Creation of a Consolidated a ourniture de 225 kits de pan Open - Internationa Single Stage - One E IDA / 67800 nd Interoperable Identity Ma Post Request for Bids 965,000.00 0.00 Signed 2022-02-28 2022-08-29 2022-03-05 2022-08-29 2022-04-16 2022-10-07 2022-05-16 2022-10-26 2022-06-20 2022-12-17 neaux solaires et de 150 batt l nvelope nagement System eries pour les communes MG-PREA-287069-GO-RFB / Creation of a Consolidated a Acquisition des serveurs ave Open - Internationa Single Stage - One E IDA / 67800 nd Interoperable Identity Ma Post Request for Bids 700,000.00 0.00 Signed 2022-04-20 2022-06-23 2022-04-25 2022-06-23 2022-06-06 2022-08-03 2022-07-06 2022-08-26 2022-08-10 2023-02-06 c accessoires pour les ressou l nvelope nagement System rces hébergement des projet s digitales UGD MG-PREA-287071-GO-RFB / Creation of a Consolidated a Open - Internationa Single Stage - One E Acquisition 425 imprimantes IDA / 67800 nd Interoperable Identity Ma Post Request for Bids 1,000,000.00 365,107.02 Signed 2022-04-21 2022-04-30 2022-04-26 2022-06-24 2022-06-07 2022-07-07 2022-07-07 2022-07-19 2022-08-11 2022-09-04 2023-02-07 l nvelope pour les communes cibles nagement System MG-PREA-306714-GO-RFB / Creation of a Consolidated a Open - Internationa Single Stage - One E Pending Impl Acquisition équipement et m IDA / 67800 nd Interoperable Identity Ma Post Request for Bids 1,500,000.00 0.00 2022-08-18 2022-08-23 2022-10-04 2022-11-03 2022-12-08 2023-03-08 l nvelope ementation obiliers nagement System MG-PREA-306795-GO-RFQ / Project Management and Im Request for Quota Single Stage - One E Pending Impl Acquisition de matériels tech IDA / 67800 Post Open - National 50,000.00 0.00 2022-09-09 2022-10-17 2022-11-16 plementation tions nvelope ementation niques de sécurité MG-PREA-318315-GO-RFQ / Acquisition des matériels/equ Project Management and Im Request for Quota Single Stage - One E Pending Impl IDA / 67800 Post Open - National 40,000.00 0.00 2022-10-23 2022-11-30 2022-12-30 ipements techniques pour les plementation tions nvelope ementation activités sauvegardes PRODIGY-F012-GO-RFB / Acq Creation of a Consolidated a Single Stage - One E uisition de bicyclettes pour le IDA / 67800 nd Interoperable Identity Ma Post Request for Bids Open - National 150,000.00 0.00 Canceled 2022-04-04 2022-03-31 2022-04-09 2022-04-07 2022-05-21 2022-05-12 2022-06-20 2022-07-25 2023-01-21 nvelope s Fokontany nagement System MG-PREA-318300-GO-RFQ / Project Management and Im Request for Quota Single Stage - One E IDA / 67800 Post Open - National 42,000.00 0.00 Signed 2022-12-09 2022-12-07 2023-02-10 2023-03-12 Fourniture de mobiliers de bu plementation tions nvelope reau MG-PREA-325611-GO-RFB / f Digital and Mobile Governm Open - Internationa Single Stage - One E IDA / 67800 Post Request for Bids 1,090,000.00 0.00 Signed 2022-12-14 2022-12-06 2022-12-19 2022-12-06 2023-01-30 2023-01-19 2023-03-01 2023-02-13 2023-04-05 2023-07-04 ourniture de tablettes avec a ent Services l nvelope ccessoires MG-PREA-318302-GO-RFB / Digital and Mobile Governm Open - Internationa Single Stage - One E Under Imple Acquisition des matériels et a IDA / 67800 Post Request for Bids 930,000.00 0.00 2022-11-24 2023-01-13 2022-11-29 2023-01-13 2023-01-10 2023-03-01 2023-02-09 2023-03-16 2023-06-14 ent Services l nvelope mentation ccessoires informatiques MG-PREA-318135-GO-RFB / Creation of a Consolidated a Open - Internationa Single Stage - One E Under Imple Acquisition des consommabl IDA / 67800 nd Interoperable Identity Ma Post Request for Bids 1,200,000.00 0.00 2022-12-15 2022-12-15 2022-12-20 2022-12-15 2023-01-31 2023-01-25 2023-03-02 2023-04-06 2023-10-03 l nvelope mentation es informatiques nagement System MG-PREA-325600-GO-RFQ / Project Management and Im Request for Quota Single Stage - One E Under Imple IDA / 67800 Post Open - National 7,200.00 0.00 2023-01-05 2023-04-20 2023-03-09 2023-04-08 Acquisition des matériels tec plementation tions nvelope mentation hniques MG-PREA-331175-GO-RFQ / Project Management and Im Request for Quota Single Stage - One E Acquisition des diverses four IDA / 67800 Post Open - National 50,000.00 0.00 Signed 2023-01-13 2022-12-23 2023-03-17 2023-04-16 plementation tions nvelope nitures et équipements MG-PREA-325599-GO-RFB / Digital and Mobile Governm Single Stage - One E Under Imple Acquisition des matériels de IDA / 67800 Post Request for Bids Open - National 360,000.00 0.00 2023-01-10 2023-01-19 2023-01-15 2023-01-19 2023-02-26 2023-03-14 2023-03-28 2023-05-08 2023-05-02 2023-07-01 ent Services nvelope mentation communication MG-PREA-337369-GO-RFQ / Digital and Mobile Governm Request for Quota Single Stage - One E IDA / 67800 Post Open - National 20,000.00 0.00 Signed 2023-01-25 2023-01-23 2023-02-24 2023-03-11 Acquisition de 50 tablettes ent Services tions nvelope MG-PREA-343338-GO-DIR / A Creation of a Consolidated a Direct - Internation Pending Impl cquisition de matériels roula IDA / 67800 nd Interoperable Identity Ma Post Direct Selection 1,935,000.00 0.00 2023-02-27 2023-03-13 2023-04-10 2023-06-09 al ementation nts nagement System MG-PREA-348856-GO-RFQ / Creation of a Consolidated a Mise à niveau des infrastruct Request for Quota Single Stage - One E Pending Impl IDA / 67800 nd Interoperable Identity Ma Post Open - National 12,000.00 0.00 2023-03-27 2023-05-11 2023-06-10 ures des connectivités du lab tions nvelope ementation nagement System oratoire de la commune de T oamasina MG-PREA-348428-GO-RFQ / Creation of a Consolidated a Request for Quota Single Stage - One E Pending Impl Acquisition des matériels info IDA / 67800 nd Interoperable Identity Ma Post Open - National 26,000.00 0.00 2023-03-31 2023-06-02 2023-07-02 tions nvelope ementation rmatiques pour le laboratoire nagement System de Toamasina MG-PREA-348768-GO-RFQ / Creation of a Consolidated a Request for Quota Single Stage - One E Under Imple Acquisition de 1000 chargeur IDA / 67800 nd Interoperable Identity Ma Post Open - National 70,000.00 0.00 2023-04-25 2023-04-07 2023-06-04 2023-07-14 tions nvelope mentation s solaires portable nagement System Page 2 PRODIGY-F004-RFB / Acquisi Creation of a Consolidated a tion de matériels techniques Open - Internationa Single Stage - One E IDA / 67800 nd Interoperable Identity Ma Post Request for Bids 510,000.00 0.00 Canceled 2022-02-24 2022-03-01 2022-04-12 2022-05-12 2022-06-16 2022-12-13 pour la modernisation du sys l nvelope nagement System tème de gestion de l’identité et de l’état civil MG-PREA-354114-GO-RFQ / Creation of a Consolidated a Acquisition imprimante à étiq Request for Quota Single Stage - One E Under Imple IDA / 67800 nd Interoperable Identity Ma Post Limited 3,600.00 0.00 2023-04-16 2023-04-05 2023-05-24 2023-07-13 uette pour l’attribution de NU tions nvelope mentation nagement System I en mode analogique MG-PREA-354121-GO-DIR / A Creation of a Consolidated a Direct - Internation Pending Impl cquisition des matériels pour IDA / 67800 nd Interoperable Identity Ma Post Direct Selection 22,000.00 0.00 2023-04-11 2023-04-16 2023-05-21 2023-07-20 al ementation le pilote MOSIP enrôlement bi nagement System ométrique MG-PREA-356672-GO-DIR / A Creation of a Consolidated a Direct - Internation Under Revie cquisition des matériels et ac IDA / 67800 nd Interoperable Identity Ma Prior Direct Selection 20,700,000.00 0.00 2023-05-26 2023-05-31 2023-07-05 2023-09-03 al w cessoires informatiques nagement System MG-PREA-356674-GO-DIR / A cquisition Imprimante multifu Digital and Mobile Governm nction HP Color LaserJet Pro IDA / 67800 Post Direct Selection Direct - National 389,000.00 0.00 Signed 2023-05-25 2023-05-09 2023-05-30 2023-05-11 2023-07-04 2023-10-02 ent Services MFP M479fdw (30 Trésorerie s Générales et 90 Perception s Principales PIFM) MG-PREA-356675-GO-DIR / A Digital and Mobile Governm IDA / 67800 Post Direct Selection Direct - National 256,000.00 0.00 Signed 2023-05-25 2023-05-09 2023-05-30 2023-05-11 2023-07-04 2023-10-02 cquisition Ordinateurs portab ent Services les Type 2 MG-PREA-356695-GO-RFB / Digital and Mobile Governm Open - Internationa Single Stage - One E Pending Impl Acquisition et Mise en place IDA / 67800 Prior Request for Bids 2,000,000.00 0.00 2023-08-16 2023-08-21 2023-10-02 2023-11-01 2023-12-06 2024-06-03 ent Services l nvelope ementation SI système e-GP MG-PREA-356692-GO-RFB / Acquisition de la plateforme Creation of a Consolidated a numérique de gestion des do Open - Internationa Single Stage - One E Pending Impl IDA / 67800 nd Interoperable Identity Ma Prior Request for Bids 12,000,000.00 0.00 2023-08-16 2023-08-21 2023-10-02 2023-11-01 2023-12-06 2024-06-03 nnées d'état civil et de l'ident l nvelope ementation nagement System ité (système ID-M moderne) adaptés au contexte à Mada gascar Creation of a Consolidated a MG-PREA-355703-GO-DIR / A Direct - Internation Under Imple IDA / 67800 nd Interoperable Identity Ma Prior Direct Selection 2,600,000.00 0.00 2023-05-26 2023-05-25 2023-05-31 2023-07-05 2023-09-03 cquisition de bicyclettes al mentation nagement System NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PRODIGY-PPA-429-NC-DIR / Connexion internet du burea Project Management and Im IDA / V2950 Post Direct Selection Direct 40,000.00 28,430.72 Signed 2020-09-21 2020-09-23 2020-09-21 2020-09-23 2020-10-07 2020-09-30 2022-10-07 u de l'Unité de Coordination plementation du PRODIGY et de l'UTSP PRODIGY-PPA-244-NC-RFQ / Location de bureau pour le P Digital and Mobile Governm Request for Quota Single Stage - One E IDA / V2950 Post Limited 32,500.00 0.00 Canceled 2020-05-20 2020-06-15 2021-06-15 RODIGY et l'UTSP pour une d ent Services tions nvelope urée de douze mois PRODIGY-PPA-227.1-NC-RFQ Digital and Mobile Governm Request for Quota Single Stage - One E IDA / V2950 Post Limited 10,000.00 25,499.92 Signed 2021-03-08 2020-04-15 2021-04-09 2021-05-08 2021-07-08 / Location de voiture pour l'U ent Services tions nvelope TSP PRODIGY-PPA-280-NC-RFQ / Abonnement de services clou Digital and Mobile Governm Request for Quota Single Stage - One E d pour mettre en place les en IDA / V2950 Post Limited 75,000.00 50,278.08 Signed 2021-03-08 2021-03-12 2021-04-06 2021-03-26 2022-04-06 ent Services tions nvelope vironnements nécessaires po ur l’hébergement d’applicati ons PRODIGY-PPA-441-NC-RFQ / Project Management and Im Request for Quota Single Stage - One E Location de voiture pour le tr IDA / V2950 Post Open - National 18,000.00 17,852.40 Signed 2021-04-30 2021-05-24 2021-05-25 2021-11-20 plementation tions nvelope ansport du personnel de l'UC P PRODIGY-PPA-439-NC-DIR / Digital and Mobile Governm Abonnement flotte Orange p IDA / V2950 Post Direct Selection Direct 7,000.00 388.06 Signed 2021-07-12 2021-07-12 2021-07-14 2021-07-16 2021-08-04 2021-09-03 2022-08-04 ent Services our l'UCP - PRODIGY PRODIGY-PPA-445-NC-RFB / Location de voiture en contra Project Management and Im Single Stage - One E IDA / V2950 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2021-07-22 2022-08-02 2021-07-29 2021-08-26 2021-09-16 2021-10-14 2023-04-07 t cadre pour les missions dan plementation nvelope s le cadre du PRODIGY PRODIGY-PPA-447-NC-RFB / Project Management and Im Request for Quota Single Stage - One E Service de restauration et loc IDA / 67800 Post Open - National 50,000.00 0.00 Canceled 2021-07-26 2021-09-22 2022-09-22 plementation tions nvelope ation de salle pour les atelier s du PRODIGY PRODIGY-PPA-288-NC-RFQ / Digital and Mobile Governm Request for Quota Single Stage - One E Pending Impl Abonnement flotte téléphoni IDA / 67800 Post Limited 7,000.00 0.00 2021-07-26 2021-09-13 2022-09-13 ent Services tions nvelope ementation que pour le personnel de l'U GD PRODIGY-PPA-443-NC-RFQ / Digital and Mobile Governm Request for Quota Single Stage - One E Assurance santé du personne IDA / V2950 Post Limited 3,500.00 0.00 Canceled 2021-06-02 2021-07-21 2022-07-21 ent Services tions nvelope l du PRODIGY PRODIGY-F016-NC-RFQ / Con Creation of a Consolidated a nexion internet pour la mise Request for Quota Single Stage - One E IDA / V2950 nd Interoperable Identity Ma Post Limited 30,000.00 0.00 Canceled 2021-05-26 2021-07-21 2022-01-17 en place et la transformation tions nvelope nagement System des données pour l'état civil PRODIGY-C013-NC-RFB / Rec Creation of a Consolidated a rutement d'une société pour Single Stage - One E IDA / 67800 nd Interoperable Identity Ma Post Request for Bids Open - National 100,000.00 0.00 Canceled 2021-06-07 2021-06-14 2021-07-14 2021-08-13 2021-09-17 2022-03-16 effectuer la saisie des actes r nvelope nagement System elatifs à l'état civil PRODIGY -3.02.01.49-NC-RF B / Recrutement BPO pour ali Digital and Mobile Governm Single Stage - One E IDA / 67800 Post Request for Bids Open - National 300,000.00 373,712.15 Signed 2022-02-28 2022-02-25 2022-03-05 2022-04-07 2022-04-16 2022-04-19 2022-05-16 2022-04-28 2022-06-20 2022-05-28 2023-07-10 menter la base de données d ent Services nvelope u système de gestion des pla intes et doléances PRODIGY-3.02.03.15-1-NC-DI Project Management and Im R / Location de voiture de dir IDA / 67800 Post Direct Selection Direct 45,000.00 39,623.41 Signed 2021-12-16 2021-12-20 2021-12-21 2021-12-21 2021-12-22 2021-12-31 2022-12-22 plementation ection pour l'UCP Page 3 MG-PREA-278622-NC-DIR / M ise en place du système de g Digital and Mobile Governm IDA / 67800 Post Direct Selection Direct 80,000.00 29,990.00 Signed 2022-02-11 2021-12-20 2022-02-16 2021-12-21 2022-03-23 2022-01-02 2022-09-19 estion de plaintes et doléanc ent Services es - volet décentralisation MG-PREA-282413-NC-RFQ / Project Management and Im Request for Quota Single Stage - One E IDA / V2950 Post Open - National 96,000.00 15,377.82 Signed 2022-03-28 2022-03-18 2022-05-23 2022-04-30 2022-12-31 Service de gardiennage pour plementation tions nvelope le PRODIGY MG-PREA-282412-GO-RFB / Project Management and Im Single Stage - One E Location d'un Hangar de stoc IDA / V2950 Post Request for Bids Open - National 360,000.00 369,824.83 Signed 2022-03-23 2022-03-23 2022-03-28 2022-04-25 2022-05-09 2022-05-11 2022-05-19 2022-05-27 2022-06-07 2022-06-24 2024-12-05 plementation nvelope kage pour les fournitures des tinées aux PMO MG-PREA-306700-NC-RFQ / Creation of a Consolidated a Request for Quota Single Stage - One E Dotation en connectivité, sm IDA / 67800 nd Interoperable Identity Ma Post Limited 47,250.00 0.00 Completed 2022-08-21 2022-09-30 2022-09-21 2022-10-21 2023-01-20 tions nvelope artphones des entités en cha nagement System rge de la RECI MG-PREA-306695-NC-RFB / Creation of a Consolidated a Single Stage - One E Pending Impl Duplication et dispatching de IDA / 67800 nd Interoperable Identity Ma Post Request for Bids Open - National 100,000.00 0.00 2022-08-30 2022-09-04 2022-10-16 2022-11-05 2022-11-26 2023-02-24 nvelope ementation s documents d'identités d'éta nagement System t civil MG-PREA-319205-NC-RFB / P restataire de service call-cen ter pour assurer la mise en o Digital and Mobile Governm Open - Internationa Single Stage - One E IDA / 67800 Prior Request for Bids 2,300,000.00 0.00 Canceled 2022-11-28 2022-12-03 2023-01-14 2023-02-13 2023-03-20 2024-12-31 euvre des services d'assistan ent Services l nvelope ce et d'information aux usag ers pour les services publics MG-PREA-325604-NC-RFQ / agence de communication et Digital and Mobile Governm Request for Quota Single Stage - One E événementielle pour l’organi IDA / 67800 Post Open - National 60,000.00 0.00 Signed 2022-12-05 2022-12-23 2023-01-30 2023-07-29 ent Services tions nvelope sation d’un concours de «be soins utilisateurs et prototyp age MG-PREA-318282-GO-RFB / Creation of a Consolidated a Numérisation de gestion des Open - Internationa Single Stage - One E Under Revie IDA / 67800 nd Interoperable Identity Ma Prior Request for Bids 5,000,000.00 0.00 2022-12-23 2023-03-06 2022-12-28 2023-03-07 2023-02-08 2023-05-22 2023-03-10 2023-04-14 2024-11-30 données d'état civil (système l nvelope w nagement System ID-M moderne) MG-PREA-319204-NC-DIR / M Digital and Mobile Governm IDA / 67800 Post Direct Selection Direct - National 590,000.00 0.00 Signed 2022-12-22 2022-12-22 2022-12-27 2023-01-18 2023-01-31 2024-12-31 ise en connexion X Road ent Services MG-PREA-333576-NC-RFB / P restataire de service call-cen ter pour assurer la mise en o Digital and Mobile Governm Open - Internationa Single Stage - One E IDA / 67800 Post Request for Bids 400,000.00 0.00 Canceled 2023-01-10 2023-01-11 2023-01-15 2023-01-11 2023-02-26 2023-02-23 2023-03-28 2023-04-18 2023-05-02 2024-12-30 euvre des services d'assistan ent Services l nvelope ce et d'information aux usag ers pour les services publics MG-PREA-334048-NC-RFQ / L Creation of a Consolidated a Request for Quota Single Stage - One E ocation de voiture de directio IDA / 67800 nd Interoperable Identity Ma Post Open - National 18,000.00 0.00 Signed 2023-01-09 2023-01-09 2023-02-18 2023-08-17 tions nvelope n nagement System MG-PREA-337840-NC-RFB / F Creation of a Consolidated a ourniture de crédit mensuel Single Stage - One E Under Imple IDA / 67800 nd Interoperable Identity Ma Post Request for Bids Limited 800,000.00 0.00 2023-01-30 2023-02-08 2023-02-04 2023-02-08 2023-03-07 2023-03-22 2023-04-20 2024-12-31 d'Internet, appels et sms po nvelope mentation nagement System ur les bureaux de 662 comm unes MG-PREA-306793-NC-RFQ / L Project Management and Im Request for Quota Single Stage - One E ogiciels intégrés de platefor IDA / 67800 Post Open - National 20,000.00 0.00 Canceled 2022-10-14 2022-11-23 2023-11-23 plementation tions nvelope me de gestion de projet MG-PREA-318321-NC-RFQ / Mise en oeuvre des utilisateu Digital and Mobile Governm Request for Quota Single Stage - One E rs testeurs pour chaque pha IDA / 67800 Post Open - National 5,000.00 0.00 Canceled 2022-10-16 2022-11-23 2023-05-22 ent Services tions nvelope se (découverte, alpha, beta, l ive) pour les projets en cours de développement MG-PREA-356697-GO-RFB / I Creation of a Consolidated a Open - Internationa Single Stage - One E Pending Impl ndexation et numérisation de IDA / 67800 nd Interoperable Identity Ma Prior Request for Bids 6,000,000.00 0.00 2023-08-16 2023-08-21 2023-10-02 2023-11-01 2023-12-06 2024-06-03 l nvelope ementation s Registres d'ECI nagement System MG-PREA-333576-NC-RFB-2 / Service call-center pour ass Digital and Mobile Governm Open - Internationa Single Stage - One E Pending Impl urer la mise en œuvre des se IDA / 67800 Post Request for Bids 400,000.00 0.00 2023-05-12 2023-05-17 2023-06-28 2023-07-19 2023-08-09 2024-12-31 ent Services l nvelope ementation rvices d'assistance et d'infor mation aux usagers pour les services publics MG-PREA-306785-NC-RFQ / Opération de numérisation et Creation of a Consolidated a Request for Quota Single Stage - One E accompagnement du person IDA / 67800 nd Interoperable Identity Ma Post Open - National 35,000.00 0.00 Canceled 2022-08-24 2022-10-01 2023-03-30 tions nvelope nel de l'Etat en charge de la nagement System préparation et au tri des regi stres CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PRODIGY-PPA-102-CS-QCBS / Réalisation d'une analyse in Creation of a Consolidated a Quality And Cost- Open - Internationa stitutionnelle, organisationne IDA / V2950 nd Interoperable Identity Ma Post 437,500.00 461,223.85 Signed 2020-05-05 2020-08-24 2020-05-11 2020-08-25 2020-06-05 2020-10-28 2020-07-20 2021-01-13 2020-08-04 2021-02-25 2020-08-26 2021-03-17 2020-09-19 2021-07-10 2020-11-18 Based Selection l lle et des procédures de gesti nagement System on de l'identité à Madagascar (PPA.102) PRODIGY-PPA-242-CS-QCBS / Recrutement d'une firme po ur assister l'unité de transfor mation digitale pour la mise Digital and Mobile Governm Quality And Cost- Open - Internationa en place la stratégie de gou IDA / V2950 Post 612,000.00 0.00 Canceled 2020-04-15 2020-04-21 2020-05-19 2020-07-03 2020-07-13 2020-08-03 2020-08-19 2020-12-31 ent Services Based Selection l vernance numérique, la pass ation de marchés agile, et la digitalisation de l'enregistre ment des entreprises au sein d'EDBM (PPA.242) PRODIGY-PPA-271-CS-CQS / Recrutement d'une firme pou Digital and Mobile Governm Consultant Qualifi IDA / V2950 Post Limited 60,000.00 51,785.96 Signed 2020-06-29 2020-07-13 2020-07-06 2020-09-14 2020-07-29 2021-10-29 2020-08-20 2020-10-31 2020-10-19 r assurer la saisie des donné ent Services cation Selection es sur la base des registres d e Fokontany Page 4 PRODIGY-PPA.420-CS-QCS / Recrutement d'une firme pou Project Management and Im Consultant Qualifi IDA / V2950 Post Open - National 50,000.00 25,440.82 Signed 2020-09-28 2020-11-26 2020-10-19 2020-12-02 2021-01-21 2021-01-01 2021-03-05 2021-02-05 2021-03-06 2021-06-05 r l'élaboration du manuel de plementation cation Selection procédures de l'Unité de Coo rdination du PRODIGY PRODIGY-PPA-308-CS-CQS / Recrutement d'une firme pou r assister le Ministère des Po Boosting the domestic digita Consultant Qualifi stes, Télécommunication et IDA / V2950 Post Open - National 100,000.00 0.00 Canceled 2020-05-15 2020-05-20 2020-06-18 2020-07-28 2020-09-01 2020-11-30 l economy cation Selection Développement Numérique s ur la régulation du secteur Té lécom, et le pilotage de smar t village. (PPA.308) PRODIGY-PPA-434-CS-QCBS Project Management and Im Quality And Cost- Open - Internationa Under Implement / Recrutement d'une agence IDA / V2950 Prior 4,290,000.00 0.00 2021-03-09 2021-05-07 2021-03-30 2021-06-14 2021-05-13 2022-02-23 2021-06-10 2022-05-10 2021-07-12 2022-10-07 2021-08-16 2021-09-20 2024-12-31 plementation Based Selection l ation de communication PRODIGY-PPA-243-2-CS-QCB Digital and Mobile Governm Quality And Cost- Open - Internationa S / Assistant technique à la tr IDA / V2950 Prior 1,200,000.00 1,002,867.61 Signed 2021-03-22 2021-06-10 2021-04-05 2021-07-26 2021-05-10 2022-01-21 2021-06-24 2022-03-22 2021-07-22 2022-05-11 2021-08-19 2022-08-11 2021-09-16 2022-08-29 2023-09-16 ent Services Based Selection l ansformation digitale pour l' UGD PRODIGY-PPA-243-CS-QCBS Digital and Mobile Governm Quality And Cost- Open - Internationa / Recrutement d'un Assistant IDA / V2950 Post 700,000.00 0.00 Canceled 2021-02-15 2021-03-08 2021-04-21 2021-05-19 2021-06-18 2021-07-23 2021-08-27 2023-08-27 ent Services Based Selection l technique à la transformatio n digitale PRODIGY-3.02.01.05-CS-LCS Project Management and Im Least Cost Selecti / Recrutement d'un cabinet d IDA / 67800 Post Open - National 100,000.00 16,856.76 Signed 2021-09-27 2021-10-11 2021-10-18 2021-12-01 2022-02-16 2021-12-29 2022-03-22 2022-01-28 2022-03-30 2022-03-04 2022-04-12 2022-04-08 2022-05-04 2025-06-30 plementation on 'audit comptable et financier pour le PRODIGY PRODIGY-PPA-272-CS-CQS / Recrutement d'une firme pou Digital and Mobile Governm Consultant Qualifi r mettre en place un logiciel IDA / V2950 Post Limited 40,000.00 0.00 Canceled 2020-06-29 2020-07-13 2020-07-06 2020-07-29 2020-08-20 2020-10-19 ent Services cation Selection de reconnaissance automatiq ue des registres de Fokontan y. PRODIGY-PPA-452-CS-CQS / Recrutement d'une agence d Project Management and Im Consultant Qualifi Open - Internationa IDA / 67800 Post 50,000.00 0.00 Canceled 2021-09-27 2021-10-18 2021-11-22 2021-12-22 2022-01-26 2022-09-23 e recrutement pour l'Unité d plementation cation Selection l e Coordination des Projets PRODIGY-241-2--CS-QCBS / Recrutement d’une firme pou Digital and Mobile Governm Quality And Cost- Open - Internationa IDA / 67800 Prior 950,000.00 0.00 Signed 2021-09-30 2021-11-12 2021-10-21 2022-02-24 2021-12-02 2022-03-28 2021-12-30 2022-05-17 2022-01-27 2022-05-31 2022-03-03 2022-10-05 2022-04-07 2024-04-06 r assurer l'Assistance Techni ent Services Based Selection l que en cybersécurité et prot ection des données PRODIGY-C001-CS-QCBS / Mi se en place d'un système d'i Digital and Mobile Governm Quality And Cost- Open - Internationa IDA / 67800 Prior 5,000,000.00 0.00 Canceled 2021-10-04 2021-10-25 2021-12-08 2022-01-21 2022-02-21 2022-03-28 2022-05-02 2022-10-29 nteropérabilité des systèmes ent Services Based Selection l d'informations du Gouverne ment (X-Road) PRODIGY-PPA-103-CS-QCBS / Recrutement d'une firme po Creation of a Consolidated a ur l'appui juridique aux réfor Quality And Cost- Open - Internationa IDA / V2950 nd Interoperable Identity Ma Post 235,000.00 0.00 Canceled 2020-04-27 2020-05-03 2020-05-29 2020-07-13 2020-07-28 2020-08-19 2020-09-14 2020-12-13 mes légales et réglementaire Based Selection l nagement System s de la transformation digital e des services publiques (PP A.103 et PPA.241) PRODIGY-241-CS-CQS / Recr utement d’un Assistant techn Digital and Mobile Governm Consultant Qualifi IDA / 67800 Post Open - National 200,000.00 0.00 Canceled 2021-09-21 2021-09-14 2021-10-12 2021-11-10 2021-12-10 2022-01-14 2024-01-04 ique en cybersécurité et prot ent Services cation Selection ection des données PRODIGY-3.02.01.06-CS-QCB S / Recrutement d'un cabinet Project Management and Im Consultant Qualifi IDA / 67800 Post Open - National 250,000.00 322,522.49 Signed 2021-12-06 2021-12-11 2021-12-20 2022-01-26 2022-01-31 2022-03-15 2022-02-21 2022-05-17 2022-03-14 2022-05-18 2024-12-31 vérificateur indépendant des plementation cation Selection PBC du PRODIGY PRODIGY-241-2-CS-CQS / Re crutement d’une firme pour a Digital and Mobile Governm Consultant Qualifi IDA / 67800 Post Open - National 950,000.00 0.00 Canceled 2021-10-11 2021-09-20 2021-11-01 2021-12-06 2022-01-05 2022-02-09 2024-01-30 ssurer l'Assistance Techniqu ent Services cation Selection e en cybersécurité et protecti on des données PRODIGY-PPA-281-1-CS-QCB S / Recrutement d’une firme Digital and Mobile Governm Quality And Cost- pour la réalisation d’un catal IDA / V2950 Post Open - National 300,000.00 166,009.75 Signed 2022-02-28 2022-02-08 2022-03-21 2022-02-11 2022-05-04 2022-04-20 2022-06-01 2022-06-08 2022-07-01 2022-07-01 2022-08-05 2022-07-21 2022-09-09 2022-07-30 2023-04-07 ent Services Based Selection ogue de services publics et c ollecte de données sur la fou rniture des services publics PRODIGY-PPA-281-CS-QCBS / Recrutement d’une firme po Digital and Mobile Governm Quality And Cost- Open - Internationa ur la réalisation d’un catalog IDA / V2950 Post 300,000.00 0.00 Canceled 2021-04-26 2021-07-20 2021-05-24 2021-07-24 2021-07-07 2021-08-04 2021-09-03 2021-10-08 2021-11-05 2022-04-04 ent Services Based Selection l ue de services publics et coll ecte de données sur la fourni ture des services publics PRODIGY-C002-CS-QCBS / R ecrutement d’un cabinet pou Creation of a Consolidated a r assurer le développement, l Quality And Cost- IDA / 67800 nd Interoperable Identity Ma Post Open - National 820,000.00 0.00 Canceled 2021-05-17 2021-06-07 2021-07-21 2021-08-20 2021-09-20 2021-10-25 2021-11-29 2023-11-29 a mise en œuvre de la straté Based Selection nagement System gie de communication relativ e à la numérisation de l'état civil MG-PREA-292611-CS-QCBS / Cabinet pour assurer les for Digital and Mobile Governm Consultant Qualifi Open - Internationa IDA / 67800 Post 152,000.00 0.00 Signed 2022-05-30 2022-07-21 2022-06-20 2022-08-18 2022-08-03 2022-10-14 2022-09-02 2022-11-24 2022-10-07 2023-05-05 mations en Bureautique - Pac ent Services cation Selection l k Microsoft Office (Word, Exc el, PowerPoint, Outlook) MG-PREA-292615-CS-QCBS / Cabinet pour assurer la form Digital and Mobile Governm Consultant Qualifi Open - Internationa IDA / 67800 Post 256,000.00 256,220.18 Signed 2022-05-12 2022-05-11 2022-06-02 2022-06-07 2022-07-16 2022-07-22 2022-08-15 2022-09-05 2022-09-19 2022-09-19 2023-03-18 ation en compétences digital ent Services cation Selection l es: TOGAF Level 1 & 2 MG-PREA-292627-CS-CQS / Digital and Mobile Governm Consultant Qualifi Open - Internationa Audit de sécurité des systèm IDA / 67800 Post 200,000.00 0.00 Signed 2022-05-31 2022-05-25 2022-06-21 2022-05-27 2022-08-04 2022-07-11 2022-09-03 2022-09-28 2022-10-08 2023-04-06 ent Services cation Selection l es d’information de Trésor PRODIGY-C004-CS-QCBS / Fo rmation des formateurs en pr Digital and Mobile Governm Quality And Cost- IDA / 67800 Post Open - National 750,000.00 0.00 Canceled 2022-03-04 2022-03-25 2022-05-06 2022-06-03 2022-07-01 2022-08-05 2022-09-09 2023-03-08 oduct management, Content ent Services Based Selection designer/ manager or writer Page 5 MG-PREA-319017-CS-QCBS / Maîtrise d’œuvre de petits tr Creation of a Consolidated a Quality And Cost- Open - Internationa avaux de réhabilitation de bu IDA / 67800 nd Interoperable Identity Ma Post 800,000.00 0.00 Canceled 2022-10-28 2022-11-18 2023-01-01 2023-01-29 2023-02-28 2023-04-04 2023-05-09 2024-12-09 Based Selection l reaux de agencement et réh nagement System abilitation des sites cibles MG-PREA-317873-CS-QCBS / Cabinet de formation interna Digital and Mobile Governm Quality And Cost- Open - Internationa Under Implement tional pour le renforcement d IDA / 67800 Prior 1,265,000.00 0.00 2022-11-28 2023-02-24 2022-12-19 2023-03-14 2023-02-01 2023-03-01 2023-03-31 2023-05-05 2023-06-09 2024-06-08 ent Services Based Selection l ation e capacité des agents de l'Et at en UX/UI & Méthodologie d e projet Agile Scrum MG-PREA-328601-CS-CQS / Digital and Mobile Governm Consultant Qualifi Open - Internationa Under Implement IDA / 67800 Post 100,000.00 0.00 2022-12-23 2022-12-15 2023-01-06 2023-02-14 2023-02-17 2023-03-10 2023-03-31 2023-05-31 Étude de la grille de rémunér ent Services cation Selection l ation ation MG-PREA-331167-CS-QCBS / Recrutement d'AMO pour acc Creation of a Consolidated a ompagner la réhabilitation d Quality And Cost- Open - Internationa Under Implement IDA / 67800 nd Interoperable Identity Ma Prior 1,300,000.00 0.00 2023-01-03 2023-02-06 2023-01-24 2023-02-16 2023-03-09 2023-04-06 2023-05-06 2023-06-10 2023-07-15 2024-07-14 es bâtiments administratifs e Based Selection l ation nagement System t la modernisation des servic es publics locaux à travers u ne approche intégrée MG-PREA-343382-CS-QCBS / Assistance Technique pour la Digital and Mobile Governm Quality And Cost- Open - Internationa Under Implement IDA / 67800 Post 800,000.00 0.00 2023-02-21 2023-03-27 2023-03-14 2023-03-27 2023-04-27 2023-05-25 2023-06-24 2023-07-29 2023-09-02 2024-12-31 Transformation Digitale des F ent Services Based Selection l ation inances Publiques PRODIGY-C018-CS-CQS / Re Creation of a Consolidated a nforcement de capacité des Consultant Qualifi IDA / 67800 nd Interoperable Identity Ma Post Open - National 60,000.00 0.00 Canceled 2022-02-11 2022-03-04 2022-04-17 2022-05-17 2022-06-21 2022-08-20 CNM et CRM dans le contrôle cation Selection nagement System dematérialisé des marchés p ublics PRODIGY-C011-CS-CQS / Am Creation of a Consolidated a Consultant Qualifi élioration du système d'archi IDA / 67800 nd Interoperable Identity Ma Post Open - National 172,000.00 0.00 Canceled 2022-03-07 2022-09-07 2022-03-28 2022-05-11 2022-06-10 2022-07-15 2023-01-11 cation Selection vage de l'état civil nagement System MG-PREA-282418-CS-QCBS / Cabinet juridique pour appuy Project Management and Im Quality And Cost- er le projet PRODIGY dans la IDA / 67800 Post Open - National 950,000.00 0.00 Canceled 2022-03-31 2022-08-02 2022-04-21 2022-06-04 2022-07-02 2022-08-01 2022-09-05 2022-10-10 2023-10-10 plementation Based Selection rédaction et amélioration des textes de lois requis par les o bjectifs du projet MG-PREA-353247-CS-QCBS / Assistance Technique à la tra Digital and Mobile Governm Quality And Cost- Open - Internationa Under Implement IDA / 67800 Post 800,000.00 0.00 2023-04-13 2023-04-03 2023-05-04 2023-04-05 2023-06-17 2023-07-15 2023-08-14 2023-09-18 2023-10-23 2024-12-24 nsformation digitale et urban ent Services Based Selection l ation isation/interopérabilité du se cteur de l’éducation MG-PREA-354119-CS-CQS / Digital and Mobile Governm Consultant Qualifi Cabinet spécialisé en recrute IDA / 67800 Post Open - National 100,000.00 0.00 Canceled 2023-04-12 2023-05-03 2023-06-01 2023-06-11 2023-06-30 2024-02-29 ent Services cation Selection ment des personnels clés du projet MG-PREA-367579-CS-CQS / c Digital and Mobile Governm Consultant Qualifi abinet de formation du perso IDA / 67800 Post Open - National 14,400.00 0.00 Under Review 2023-06-21 2023-06-28 2023-07-12 2023-08-25 2023-09-14 2023-10-03 2024-01-31 ent Services cation Selection nnel de l’UCP et de l’UGD en ANGLAIS MG-PREA-306827-CS-CQS / F Creation of a Consolidated a Consultant Qualifi Open - Internationa ormation CFE des juridictions IDA / 67800 nd Interoperable Identity Ma Post 90,000.00 0.00 Canceled 2022-08-17 2022-09-07 2022-10-05 2022-10-12 2022-10-19 2023-04-17 cation Selection l financières nagement System INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PRODIGY-PPA-201-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d'un Assistant T IDA / V2950 Post Limited 20,000.00 16,624.74 Completed 2020-04-03 2020-05-04 2020-04-06 2019-12-12 2020-04-13 2020-03-20 2020-04-27 2020-05-19 2020-08-31 2021-01-01 ent Services ant Selection echnique Product Owner (PP A.201) PRODIGY-PPA-203-CS-INDV / Recrutement d'un Assistant T Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 16,000.00 42,270.46 Completed 2020-04-03 2020-07-15 2020-04-06 2020-10-05 2020-04-16 2020-10-21 2020-04-30 2020-10-23 2020-08-31 2021-01-01 echnique aux Services Numé ent Services ant Selection riques - Directeur des techno logies (PPA.203) PRODIGY-PPA-205-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d'un Assistant T IDA / V2950 Post Limited 8,500.00 1,721.67 Completed 2020-04-03 2020-06-10 2020-04-06 2019-12-17 2020-04-16 2020-10-28 2020-04-30 2020-11-04 2020-08-30 2021-01-30 ent Services ant Selection echnique Designer UX/UI (PP A.205) PRODIGY-PPA-206-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d'un Assistant T IDA / V2950 Post Limited 12,000.00 7,208.39 Completed 2020-04-03 2020-05-04 2020-04-06 2019-12-12 2020-04-13 2020-03-20 2020-04-27 2020-05-21 2020-08-31 2021-01-01 ent Services ant Selection echnique Développeur 1 (PP A.206) PRODIGY-PPA-207-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d'un Assistant T IDA / V2950 Post Limited 12,000.00 1,030.11 Completed 2020-04-03 2020-06-10 2020-04-06 2020-10-07 2020-04-16 2020-11-26 2020-04-30 2020-12-15 2020-08-31 2021-01-01 ent Services ant Selection echnique Développeur 2 (PP A.207) PRODIGY-PPA-403-CS-INDV / Recrutement d'un Assistant e Project Management and Im Individual Consult IDA / V2950 Post Limited 5,000.00 3,413.55 Signed 2020-04-06 2020-06-10 2020-04-09 2020-06-16 2020-04-20 2020-08-17 2020-04-30 2020-08-18 2020-08-31 n Passation de Marchés pour plementation ant Selection le PRODIGY (PPA.403) PRODIGY-PPA-405-CS-INDV / Project Management and Im Individual Consult Recrutement d'un Assistant IDA / V2950 Post Limited 5,000.00 0.00 Canceled 2020-04-06 2020-08-12 2020-04-09 2020-06-16 2020-04-20 2020-04-30 2020-08-31 plementation ant Selection Comptable pour le PRODIGY ( PPA.405) PRODIGY-PPA-404-CS-CDS / Recrutement d'un Responsab Project Management and Im IDA / V2950 Post Direct Selection Direct 5,900.00 4,792.75 Completed 2020-01-30 2020-01-30 2020-02-10 2020-01-30 2020-02-18 2020-02-19 2020-09-04 2020-09-01 le Administratif et Financier p plementation our le PRODIGY (PPA.404) PRODIGY-PPA-402-CS-CDS / Recrutement d'un Responsab Project Management and Im IDA / V2950 Post Direct Selection Direct 5,300.00 4,378.73 Completed 2020-02-03 2020-02-13 2020-02-18 2020-02-17 2020-02-18 2020-02-18 2020-08-31 2020-02-18 le de la Passation de Marchés plementation pour le PRODIGY (PPA.402) PRODIGY-PPA-208-CS-INDV / Recrutement d'un Assistant T Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 15,000.00 2,666.19 Signed 2020-04-03 2020-06-10 2020-04-06 2020-12-16 2020-04-13 2020-10-01 2020-04-27 2020-10-23 2020-08-31 echnique à Maîtrise d'ouvrag ent Services ant Selection e informatique 1 (user resear cher) (PPA.208) Page 6 PRODIGY-PPA-415-CS-INDV / Recrutement d'une Assistant Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 3,870.00 19,621.32 Signed 2020-04-30 2021-01-17 2020-05-07 2021-04-15 2020-05-17 2021-06-07 2020-05-29 2021-07-17 2020-08-31 (e) de Direction par la PIU po ent Services ant Selection ur une mise à disposition de l 'UTSP. PPA-415 PRODIGY-PPA-210-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d'un Assistant T IDA / V2950 Post Limited 31,000.00 0.00 Canceled 2020-04-03 2020-04-06 2020-04-13 2020-04-27 2020-08-31 ent Services ant Selection echnique Architecte Techniq ue (PPA.210) PRODIGY-PPA-242--CS-CDS / Recrutement d'une firme pou r assister l'unité de transform ation digitale pour la mise en Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 315,000.00 312,065.22 Signed 2020-06-01 2020-06-19 2020-07-24 2020-10-06 2020-08-23 place la stratégie de gouvern ent Services ance numérique, la passation de marchés agile, et la digita lisation de l'enregistrement d es entreprises au sein d'EDB M (PPA.242) PRODIGY-PPA-417-CS-CDS / Recrutement d'un Responsab Project Management and Im IDA / V2950 Post Direct Selection Direct 3,500.00 2,078.78 Signed 2020-05-25 2020-06-10 2020-05-29 2020-07-01 2020-06-01 2020-07-02 2020-12-31 le en Suivi-Evaluation pour l' plementation Unité de Coordination du PR ODIGY (PPA.417) PRODIGY-PPA-412-CS-INDV / Recrutement d'un(e) Assista Project Management and Im Individual Consult IDA / V2950 Post Limited 2,000.00 16,587.77 Signed 2020-05-27 2020-06-10 2020-06-01 2020-09-18 2020-06-12 2020-09-30 2020-06-25 2020-12-02 2021-01-01 nt(e) de Direction pour l'Unit plementation ant Selection é de Coordination du PRODIG Y (PPA.412) PRODIGY-PPA-418-CS-CDS / Recrutement d'un Responsab Project Management and Im le en Sauvegarde Environne IDA / V2950 Post Direct Selection Direct 3,500.00 2,338.63 Signed 2020-05-25 2020-06-10 2020-05-29 2020-07-01 2020-06-01 2020-07-02 2020-12-31 plementation mentale et Sociale pour l'Unit é de Coordination du PRODIG Y (PPA.418) PRODIGY-PPA-414-CS-CDS / Recrutement d'un Coordonna Project Management and Im IDA / V2950 Post Direct Selection Direct 7,500.00 6,390.59 Signed 2020-04-21 2019-10-18 2020-04-21 2020-04-21 2020-04-24 2020-04-25 2020-06-30 teur pour l'Unité de Coordina plementation tion du PRODIGY. (PPA.414) PRODIGY-PPA-202-CS-INDV / Recrutement d'un Assistant T Digital and Mobile Governm Individual Consult echnique Architecte Urbanist IDA / V2950 Post Limited 18,000.00 0.00 Canceled 2020-04-03 2020-05-06 2020-04-06 2019-12-12 2020-04-13 2020-04-27 2020-08-31 ent Services ant Selection e Système d'Information /Séc urité Infra & Data (PPA.202) PRODIGY-PPA-210-1-CS-IND V / Recrutement d'un Assista Digital and Mobile Governm Individual Consult nt Technique Architecte Urba IDA / V2950 Post Limited 49,884.00 49,884.00 Completed 2020-04-06 2020-05-11 2020-04-10 2019-12-16 2020-04-16 2020-03-06 2020-05-18 2020-05-19 2020-12-31 2021-01-01 ent Services ant Selection niste Système d'Information/ Sécurité Infra & Data(PPA.21 0) PRODIGY-PPA-253-CS-INDV / Recrutement d’un(e) Assista nt(e) Technique Architecte Ur Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 6,500.00 11,253.74 Completed 2020-06-19 2020-06-29 2020-06-22 2020-03-20 2020-07-02 2020-07-09 2020-07-17 2020-07-28 2020-12-31 2021-01-01 baniste Système d’Informatio ent Services ant Selection n / Sécurité Infrastructures & Data EDBM (PTA-253) PRODIGY-PPA-254-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d'un Assistant T IDA / V2950 Post Limited 2,500.00 784.86 Signed 2020-06-19 2020-06-29 2020-06-22 2020-10-12 2020-07-02 2020-10-21 2020-07-17 2020-11-07 2020-12-31 ent Services ant Selection echnique Designer UX/UI (PP A.254) PRODIGY-PPA.273-CS-DIR / R Digital and Mobile Governm ecrutement d'un Assistant Te IDA / V2950 Post Direct Selection Direct 12,600.00 11,584.08 Completed 2020-06-30 2020-07-10 2020-07-09 2020-07-13 2020-07-24 2020-07-28 2020-12-31 2021-01-01 ent Services chnique Product Owner pour l'EDBM PRODIGY-PPA.274-CS-DIR / R ecrutement d'un Assistant Te Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 12,600.00 11,584.08 Completed 2020-06-30 2020-07-10 2020-07-09 2020-07-13 2020-07-24 2020-07-28 2020-12-31 2021-01-01 chnique Assistant à Maîtrise ent Services d'ouvrage pour l'EDBM PRODIGY-PPA.275-CS-DIR / R Digital and Mobile Governm ecrutement d'un Assistant Te IDA / V2950 Post Direct Selection Direct 6,600.00 5,792.04 Completed 2020-06-30 2020-07-10 2020-07-09 2020-07-13 2020-07-24 2020-07-28 2020-12-31 2021-01-01 ent Services chnique développeur full stac k pour l'EDBM PRODIGY-PPA-270-CS-DIR / R ecrutement d'un Assistant Te Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 58,320.00 58,320.26 Signed 2020-06-29 2020-07-01 2020-06-30 2020-06-01 2020-07-01 2020-07-30 2020-12-31 chnique Chief Digital Officer ent Services auprès de la Présidence PRODIGY-PPA-405-CS-INDV- 2 / Recrutement d'un(e) Com Project Management and Im Individual Consult IDA / V2950 Post Open 53,200.00 37,535.17 Signed 2020-09-24 2020-09-23 2020-10-29 2021-02-04 2020-11-05 2021-02-04 2020-12-03 2021-03-03 2021-04-02 ptable pour l'Unité de Coordi plementation ant Selection nation du PRODIGY PRODIGY-PPA.423-CS-INDV / Recrutement d'un(e) Assista Project Management and Im Individual Consult IDA / V2950 Post Open 53,200.00 19,937.14 Signed 2020-09-24 2020-09-26 2020-11-03 2021-03-26 2020-11-11 2021-03-26 2020-12-09 2021-04-21 2024-12-08 nt(e) en Suivi et Évaluation p plementation ant Selection our l' Unité de Coordination d u PRODIGY PRODIGY-PPA-414.2-CS-DIR / Project Management and Im Individual Consult Renouvellement du contrat d IDA / V2950 Post Direct 104,000.00 111,830.62 Signed 2020-08-28 2020-09-26 2020-09-09 2020-10-06 2020-09-16 2020-10-06 2020-09-22 2020-10-07 2024-09-21 plementation ant Selection u Coordonnateur du PRODIG Y PRODIGY-PPA-402.2-CS-DIR / Renouvellement du contrat d Project Management and Im Individual Consult IDA / V2950 Post Direct 56,000.00 60,691.28 Signed 2020-08-28 2020-09-26 2020-09-09 2020-06-30 2020-09-16 2020-07-01 2020-09-22 2020-10-07 2024-09-21 e la Responsable de la Passat plementation ant Selection ion de Marchés du PRODIGY PRODIGY-PPA-404.2-CS-DIR / Renouvellement du contrat d Project Management and Im Individual Consult IDA / V2950 Post Direct 56,000.00 60,691.28 Signed 2020-08-28 2020-09-26 2020-09-09 2020-10-06 2020-09-16 2020-10-06 2020-09-22 2020-10-07 2024-09-21 e la Responsable Administrat plementation ant Selection ive et Financière du PRODIGY PRODIGY-PPA-252-CS-DIR / A Digital and Mobile Governm Individual Consult IDA / V2950 Post Direct 40,000.00 31,521.74 Completed 2020-09-28 2020-10-06 2020-10-12 2020-10-13 2020-10-19 2020-10-24 2020-10-24 2020-10-31 2021-01-16 2022-01-25 ssistance Technique à l'e-pro ent Services ant Selection curement PRODIGY-PPA-255-CS-INDV / Recrutement d'un Assistant T Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 15,000.00 972.62 Completed 2020-10-12 2020-11-12 2020-11-02 2020-08-03 2020-11-09 2020-11-12 2020-11-30 2020-11-28 2021-11-30 2021-01-01 echnique Développeur Full St ent Services ant Selection ack pour l' EDBM Page 7 PRODIGY-PPA-209-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d'un Assistant T IDA / V2950 Post Limited 15,000.00 58,991.85 Signed 2020-10-19 2020-11-12 2020-11-02 2021-03-11 2020-11-09 2021-04-21 2020-11-30 2021-06-08 2021-11-30 ent Services ant Selection echnique AMOA 2 pour l'UTS P PRODIGY-PPA-212-CS-INDV / Recrutement d'un Assistant T Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 2,800.00 1,064.05 Completed 2020-10-19 2020-11-12 2020-11-02 2019-12-12 2020-11-09 2020-11-18 2020-11-30 2020-12-04 2021-03-30 2021-01-01 echnique Administrateur de ent Services ant Selection base de données pour l'UTSP PRODIGY-PPA-450-CS-INDV / Project Management and Im Individual Consult Recrutement d'un secrétaire IDA / V2950 Post Limited 24,000.00 16,068.93 Signed 2020-11-03 2020-11-12 2020-11-10 2020-11-24 2020-11-17 2021-01-27 2020-12-08 2021-03-02 2024-12-31 plementation ant Selection en passation de marchés pou r le PRODIGY PRODIGY-PPA.422-CS-INDV / Recrutement d'un(e) Chargé( Project Management and Im Individual Consult IDA / V2950 Post Limited 78,000.00 54,869.49 Signed 2020-11-03 2020-11-12 2020-11-06 2020-12-18 2020-11-13 2021-01-26 2020-11-30 2021-02-17 2024-12-31 e) de Genre pour l'Unité de C plementation ant Selection oordination du PRODIGY PRODIGY-PPA-419-CS-CDS / Project Management and Im Recrutement d'un Gestionnai IDA / V2950 Post Direct Selection Direct 58,000.00 47,800.11 Signed 2020-10-31 2020-11-12 2020-11-04 2020-11-04 2020-11-06 2020-11-12 2024-12-31 plementation re de contrats pour l'UCP. PRODIGY-PPA-228-CS-INDV / Recrutement d'un Assistant t Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 4,200.00 67,245.90 Signed 2020-11-16 2020-11-16 2020-11-30 2020-11-23 2020-12-07 2021-01-11 2020-12-28 2021-01-26 2021-02-26 echnique en technologies inf ent Services ant Selection ormatiques internes pour l'U TSP PRODIGY-PPA-229-CS-DIR / R ecrutement d'un Assistant Te Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 1,500.00 738.24 Completed 2020-11-26 2020-12-09 2020-11-27 2020-12-15 2020-12-01 2020-12-17 2020-12-31 2021-01-01 chnique Analyste en Gouvern ent Services ance Numérique pour l'UTSP PRODIGY-PPA-201-2-CS-CDS / Renouvellement du contrat Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 110,000.00 109,884.21 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 de l'Assistant Technique Prod ent Services uct Owner de l'UTSP PRODIGY-PPA-203-2-CS-CDS / Renouvellement du contrat Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 110,000.00 109,485.91 Completed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2021-01-02 2024-12-31 2022-03-01 de l'Assistant Technique Chie ent Services f Technology Officer auprès d e l'UTSP PRODIGY-PPA-205-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 41,000.00 18,481.44 Signed 2020-12-18 2020-12-19 2020-12-22 2020-12-23 2020-12-30 2021-01-02 2024-12-31 e l'Assistant Technique Conc ent Services epteur/designer UX/UI auprès de l'UTSP PRODIGY-PPA-206-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 48,000.00 47,833.03 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique Dével ent Services oppeur Full Stack auprès de l 'UTSP PRODIGY-PPA-207-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 83,000.00 82,518.30 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique Dével ent Services oppeur Full Stack auprès de l 'UTSP PRODIGY-PPA-208-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 55,000.00 55,018.43 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique AMO ent Services A auprès de l'UTSP PRODIGY-PPA-210-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 312,000.00 311,040.00 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique Archit ent Services ect Urbanist au sein de l'UTS P PRODIGY-PPA-212-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 55,000.00 55,020.64 Signed 2020-12-18 2020-12-19 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique Base ent Services de données (DBA) de l'UTSP PRODIGY-PPA-229-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 69,000.00 68,772.25 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant technique Analy ent Services ste en gouvernance numériq ue pour l'UTSP PRODIGY-PPA-253-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 55,000.00 133,150.51 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistance Technique Arc ent Services hitecte Urbaniste pour l'EDB M PRODIGY-PPA-254-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 21,000.00 20,626.41 Signed 2020-12-18 2020-12-19 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique Conc ent Services epteur Designer UX/UI pour E DBM PRODIGY-PPA-255-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 42,000.00 41,252.82 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique Dével ent Services oppeur FULL STACK pour l'ED BM PRODIGY-PPA-270-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 467,000.00 466,560.00 Completed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 2021-08-17 e l'Assistant Technique Chief ent Services Digital Officer auprès de la Pr ésidence PRODIGY-PPA-273-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 110,000.00 109,332.63 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique Produ ent Services ct Owner pour l'EDBM PRODIGY-PPA-274-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 110,000.00 109,979.60 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique Assist ent Services ant à Maîtrise d'ouvrage pour l'EDBM PRODIGY-PPA-275-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm IDA / V2950 Post Direct Selection Direct 55,000.00 54,595.81 Signed 2020-12-18 2020-12-18 2020-12-22 2020-12-23 2020-12-30 2020-12-29 2024-12-31 e l'Assistant Technique dével ent Services oppeur full stack pour l'EDBM Page 8 PRODIGY-PPA-418.2-CS-DIR / Responsable en Sauvegarde Project Management and Im IDA / V2950 Post Direct Selection Direct 53,000.00 49,639.94 Signed 2021-01-19 2020-06-29 2021-01-22 2020-07-01 2021-01-22 2020-07-02 2024-12-31 Environnementale et Sociale plementation pour l'Unité de Coordination du PRODIGY PRODIGY-PPA-417.2-CS-CDS / Responsable en Suivi et Eva Project Management and Im IDA / V2950 Post Direct Selection Direct 53,000.00 2,067.12 Signed 2021-01-19 2020-06-29 2021-01-22 2020-07-01 2021-01-22 2020-07-02 2024-12-31 luation pour l'Unité de Coordi plementation nation du PRODIGY PRODIGY-PPA-278-CS-INDV / Recrutement d'un Assistant T Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 62,000.00 50,927.34 Signed 2021-02-08 2021-03-10 2021-02-11 2021-03-26 2021-02-25 2021-03-31 2021-03-18 2021-04-17 2024-12-31 echnique développeur full st ent Services ant Selection ack 3 pour l'UTSP PRODIGY-PPA-276-CS-INDV / Recrutement d'un Assistant T Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 62,000.00 50,927.34 Signed 2021-02-08 2021-03-10 2021-02-11 2021-03-26 2021-02-25 2021-03-31 2021-03-18 2021-04-17 2024-12-30 echnique développeur full st ent Services ant Selection ack 2 pour l'UTSP PRODIGY-PPA-432-CS-INDV / Project Management and Im Individual Consult Assistant Technique en Passa IDA / V2950 Post Open 90,000.00 81,600.00 Signed 2021-03-16 2021-05-15 2021-04-26 2021-11-23 2021-05-17 2021-11-25 2021-06-14 2021-12-17 2022-04-10 plementation ant Selection tion de Marchés PRODIGY-PPA-248-CS-INDV / Consultant Spécialisé dans le Digital and Mobile Governm Individual Consult Secteur des Télécommunicati IDA / V2950 Post Open 50,000.00 147,929.33 Signed 2021-03-16 2021-04-01 2021-04-27 2022-04-20 2021-05-18 2022-05-11 2021-06-22 2022-05-12 2021-09-20 ent Services ant Selection ons et des Technologies de l'I nformation et de la Communi cation PRODIGY-PPA-433-CS-INDV / Project Management and Im Individual Consult Assistant technique en comm IDA / V2950 Post Open 60,000.00 0.00 Canceled 2021-03-16 2022-07-21 2021-04-27 2021-05-18 2021-06-22 2022-04-18 plementation ant Selection unication pour l'UCP PRODIGY-PPA-279-CS-INDV / Digital and Mobile Governm Individual Consult Assistant(e) Technique Produ IDA / V2950 Post Open 65,000.00 80,555.48 Signed 2021-03-22 2021-03-31 2021-04-19 2021-06-04 2021-04-26 2021-06-07 2021-05-17 2021-06-30 2024-12-31 ent Services ant Selection ct Owner pour l'UGD PRODIGY-PPA.428-1-CS-IND Project Management and Im Individual Consult V / Chargé(e) d'Opérations p IDA / V2950 Post Open 67,000.00 126,404.04 Signed 2021-03-18 2021-04-27 2021-04-27 2021-09-08 2021-05-18 2021-09-10 2021-06-08 2021-10-02 2024-12-31 plementation ant Selection our le PRODIGY PRODIGY-PPA-429-CS-INDV / Project Management and Im Individual Consult Recrutement d'un Spécialiste IDA / V2950 Post Direct 38,000.00 32,066.73 Signed 2021-03-26 2021-04-15 2021-04-01 2021-01-06 2021-04-02 2021-04-29 2021-04-05 2021-04-30 2024-12-31 plementation ant Selection en Passation de Marchés pou r le PRODIGY PRODIGY-PPA-407-2-CS-CDS / Maintenance du logiciel de Project Management and Im comptabilité TOM2PRO et fo IDA / V2950 Post Direct Selection Direct 10,000.00 23,400.62 Signed 2021-04-21 2021-06-04 2021-04-28 2021-06-17 2021-05-07 2021-06-23 2024-12-31 plementation rmation de l'équipe administr ative et financière du PRODI GY PRODIGY-PPA-426-CS-CDS / Recrutement d'un(e) Assista Project Management and Im nt(e) en Sauvegarde environ IDA / V2950 Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-11-02 2020-11-16 2020-11-10 2020-11-19 2024-12-31 plementation nementale et sociale pour l' Unité de Coordination des Pr ojets PRODIGY-PPA-403.2-CS-DIR / Project Management and Im Individual Consult Assistant en Passation de Ma IDA / V2950 Post Direct 35,000.00 0.00 Canceled 2021-01-19 2021-01-22 2021-01-22 2021-01-22 2024-12-31 plementation ant Selection rchés du PRODIGY PRODIGY-PPA-282-CS-CI / Re Digital and Mobile Governm Individual Consult crutement d'un Assistant Tec IDA / V2950 Post Open 78,000.00 60,380.39 Signed 2021-05-24 2021-06-23 2021-07-05 2021-10-20 2021-07-19 2021-10-22 2021-08-02 2021-12-03 2024-12-31 ent Services ant Selection hnique Product Owner 4 pour l'UGD PRODIGY-PPA-284-CS-CI / Re Digital and Mobile Governm Individual Consult crutement d'un Assistant tec IDA / V2950 Post Open 56,000.00 55,690.92 Signed 2021-05-24 2021-06-20 2021-07-05 2021-10-19 2021-07-19 2021-10-20 2021-08-09 2021-11-27 2024-12-31 ent Services ant Selection hnique AMOA 4 auprès de l'U GD PRODIGY-PPA-283-CS-CDS / Digital and Mobile Governm Individual Consult Recrutement d'un Assistant T IDA / V2950 Post Open 78,000.00 60,380.39 Signed 2021-05-26 2021-06-23 2021-07-07 2021-10-20 2021-07-21 2021-10-22 2021-08-11 2021-12-01 2025-01-02 ent Services ant Selection echnique Product Owner 3 po ur l'UGD PRODIGY-PPA-285-CS-CI / Re Digital and Mobile Governm Individual Consult crutement d'un Assistant Tec IDA / V2950 Post Open 56,000.00 56,196.18 Signed 2021-05-26 2021-06-23 2021-07-07 2021-10-19 2021-07-21 2021-10-20 2021-08-11 2021-11-20 2025-01-02 ent Services ant Selection hnique AMOA 3 auprès de l'U GD PRODIGY-PPA-401-2-CS-IND V / Recrutement d'un Assista Project Management and Im Individual Consult IDA / 67800 Post Open 88,000.00 158,502.18 Signed 2021-07-06 2021-08-25 2021-08-24 2022-01-27 2021-09-14 2022-03-15 2021-10-12 2022-05-11 2024-12-31 nt Technique spécialiste en é plementation ant Selection tat civil et gestion de l'identit é pour l'UCP PRODIGY-PPA-421-2-CS-IND V / Recrutement d'un(e) Assi Project Management and Im Individual Consult IDA / 67800 Post Open 88,000.00 23,105.54 Signed 2021-07-12 2021-08-25 2021-08-30 2022-02-02 2021-09-13 2022-02-14 2021-10-11 2022-02-15 2024-12-31 stante(e) Technique chargé(e plementation ant Selection ) de Transformation Digitale pour l'UCP PRODIGY-PPA-449-CS-INDV / Project Management and Im Individual Consult Recrutement d'un Consultant IDA / 67800 Post Open 88,000.00 0.00 Canceled 2021-07-07 2022-07-21 2021-08-23 2021-09-06 2021-10-04 2024-12-15 plementation ant Selection fonctionnel pour l'UCP PRODIGY-450-CS-INDV / Rec Project Management and Im Individual Consult rutement d'un Assistant en P IDA / 67800 Post Open 27,000.00 18,303.75 Signed 2021-07-01 2021-07-26 2021-08-17 2021-11-12 2021-08-20 2021-11-15 2021-09-07 2021-12-02 2024-12-31 plementation ant Selection assation de Marchés dédié a u STEP PRODIGY-PPA-431-2-CS-IND Project Management and Im Individual Consult V / Recrutement d’un Coach IDA / 67800 Post Direct 33,200.00 19,140.00 Signed 2021-07-22 2021-07-15 2021-07-30 2021-07-15 2021-08-06 2021-07-28 2021-08-11 2021-08-03 2022-02-07 plementation ant Selection pour l’Unité de Coordination PRODIGY-PPA.401-CS-INDV / Recrutement d'un(e) Chargé( Project Management and Im Individual Consult IDA / V2950 Post Open 78,000.00 0.00 Canceled 2020-09-24 2020-10-31 2020-11-03 2020-11-11 2020-12-10 2021-12-10 e) d' Etat Civil et gestion de l' plementation ant Selection identité pour l' UCP PRODIGY PRODIGY-PPA.421-CS-INDV / Recrutement d'un(e) Chargé Project Management and Im Individual Consult IDA / V2950 Post Open 78,000.00 0.00 Canceled 2020-10-08 2020-11-16 2020-11-17 2020-11-25 2020-12-23 2024-12-22 (e) de Transformation Digital plementation ant Selection e pour l'UCP PRODIGY Page 9 PRODIGY-PPA.428-CS-INDV / Recrutement d'un(e) Chargé( Project Management and Im Individual Consult IDA / V2950 Post Open 78,000.00 0.00 Canceled 2020-09-24 2020-10-31 2020-11-03 2020-11-11 2020-12-09 2024-12-08 e) d'Opérations pour l' Unité plementation ant Selection de Coordination du PRODIGY PRODIGY-PPA-431-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d’un Coach pou IDA / V2950 Post Direct 20,000.00 0.00 Canceled 2021-03-02 2021-03-10 2021-03-16 2021-03-30 2021-04-20 2021-05-15 ent Services ant Selection r l’Unité de Coordination PRODIGY-PPA-211-2-CS-DIR / Renouvellement du contrat d Digital and Mobile Governm e l'Assistant Technique Agile IDA / V2950 Post Direct Selection Direct 110,000.00 0.00 Canceled 2020-12-18 2020-12-18 2020-12-22 2020-12-30 2024-12-31 ent Services Delivery Manager Scrum Mas ter au sein de l'UTSP PRODIGY-PPA-211-CS-INDV / Recrutement d'un Assistant T Digital and Mobile Governm Individual Consult IDA / V2950 Post Limited 28,000.00 0.00 Canceled 2020-04-03 2020-07-15 2020-04-06 2020-04-13 2020-04-27 2020-08-31 echnique Agile Delivery/ Scru ent Services ant Selection m master (PPA.211) PRODIGY-PPA.424-CS-INDV / Recrutement d'un(e) Chargé( Project Management and Im Individual Consult IDA / V2950 Post Limited 78,000.00 0.00 Canceled 2020-11-23 2020-11-24 2020-11-26 2020-12-10 2021-01-07 2024-12-31 e) de Communication pour l' plementation ant Selection Unité de Coordination du PR ODIGY PRODIGY-453-CS-INDV / Rec Project Management and Im Individual Consult rutement d'un Responsable e IDA / 67800 Post Open 90,000.00 0.00 Canceled 2021-09-27 2021-10-04 2021-11-08 2021-11-22 2021-12-20 2024-12-24 plementation ant Selection n Gouvernance pour le PROD IGY PRODIGY-290-CS-CDS / Recr utement d'un Assistant Tech nique dans le cadre du progr Digital and Mobile Governm IDA / 67800 Post Direct Selection Direct 200,000.00 217,391.33 Signed 2021-09-24 2021-09-20 2021-10-04 2021-09-22 2021-12-08 2022-01-14 2022-12-07 amme de formation pour la t ent Services ransformation digitale de Ma dagascar Projet PRODIGY PRODIGY-292-CS-CDS / Recr utement d'une firme pour as Digital and Mobile Governm surer l'Assistance Technique IDA / 67800 Post Direct Selection Direct 950,000.00 931,771.41 Signed 2021-09-29 2021-09-20 2021-10-11 2021-09-29 2021-11-29 2021-12-11 2022-11-29 ent Services pour le programme de forma tion en compétences digitale s PRODIGY-PPA-425-CS-INDV / Project Management and Im Individual Consult Recrutement d'un chargé de IDA / V2950 Post Open 78,000.00 0.00 Canceled 2020-11-09 2020-11-15 2020-12-14 2020-12-21 2021-01-04 2024-12-31 plementation ant Selection s immobilisations pour le PR ODIGY PRODIGY-291-CS-CDS / Recr utement d'un cabinet spéciali Digital and Mobile Governm sé pour le recrutement d'un IDA / 67800 Post Direct Selection Direct 70,000.00 0.00 Canceled 2021-09-30 2021-10-11 2021-12-06 2022-02-04 ent Services Chief Digital Officer (CDO) et d'un Lead Delivery Manager ( LDM) PRODIDY-PPA-286-CS-INDV / Recrutement d’un consultant individuel pour le développe Digital and Mobile Governm Individual Consult IDA / V2950 Post Direct 3,200.00 0.00 Canceled 2021-07-22 2021-07-14 2021-07-30 2021-08-06 2021-08-11 2021-09-03 ment de la synchronisation d ent Services ant Selection e données entre l’application web orinasa.edbm.mg et l’ap plication desktop PANDORA PRODIGY-PPA-256-CS-INDV / Digital and Mobile Governm Individual Consult Recrutement d'un Technical IDA / V2950 Post Limited 2,200.00 0.00 Canceled 2020-10-19 2020-12-08 2020-11-02 2020-11-09 2020-11-30 2020-12-30 ent Services ant Selection Expert pour l'EDBM PRODIGY-3.02.01.21-CS-IND Project Management and Im Individual Consult V / Recrutement d'un Respon IDA / 67800 Post Open 75,000.00 39,173.90 Signed 2021-11-23 2021-12-15 2022-01-11 2022-03-14 2022-01-18 2022-04-04 2022-02-08 2022-04-26 2024-12-31 plementation ant Selection sable en Suivi et Evaluation p our le PRODIGY PRODIGY-3.02.01.24-CS-IND V / Recrutement d'un Respon Project Management and Im Individual Consult Under Implement IDA / 67800 Prior Open 75,000.00 0.00 2021-11-23 2022-01-23 2022-01-11 2022-01-18 2022-02-08 2024-12-31 sable de la Passation de Marc plementation ant Selection ation hés pour le PRODIGY PRODIGY-PPA-448-CS-INDV / Recrutement d'un Assistant T Project Management and Im Individual Consult echnique en charge de la con IDA / V2950 Post Open 50,000.00 0.00 Canceled 2021-07-05 2021-10-04 2021-08-16 2021-08-23 2021-09-13 2022-09-13 plementation ant Selection formité, validation et du con trôle qualité des TDR de l'UC P PRODIGY-291-2-CS-CDS / Re crutement d'un cabinet spéci Digital and Mobile Governm alisé pour le recrutement d'u IDA / 67800 Post Direct Selection Direct 150,000.00 0.00 Canceled 2021-09-23 2021-09-20 2021-10-04 2021-11-29 2022-01-28 ent Services n Chief Digital Officer (CDO) et d'un Lead Delivery Manag er (LDM) PRODIGY-PPA-107-CS-CI / Re crutement d’un assistant tec Creation of a Consolidated a Individual Consult hnique à la programmation, IDA / V2950 nd Interoperable Identity Ma Post Open 95,000.00 0.00 Signed 2022-03-07 2022-08-17 2022-04-25 2022-10-14 2022-05-09 2022-10-18 2022-05-30 2023-05-30 ant Selection au suivi et à l’évaluation des nagement System activités du MID dans le cadr e du projet PRODIGY PRODIGY- 3.02.01.50 -CS-IN DV / Recrutement d'un infor Project Management and Im Individual Consult Under Implement IDA / 67800 Post Open 40,000.00 0.00 2022-02-07 2023-03-24 2022-03-21 2022-04-04 2022-04-25 2022-08-11 maticien pour l'automatisatio plementation ant Selection ation n du processus d'affaires de l 'UCP et de l'UGD PRODIGY-2.02.03.12-CS-CDS / Assistance technique à la m Project Management and Im ise en œuvre système d’infor IDA / 67800 Prior Direct Selection Direct 1,530,000.00 1,438,198.30 Signed 2021-11-22 2022-03-02 2022-01-12 2022-03-08 2022-01-27 2022-03-31 2022-07-26 plementation mation de gestion de la Direc tion Générale des Impôts PRODIGY-2.02.03.13-CS-CDS Project Management and Im / Validation des données des IDA / 67800 Prior Direct Selection Direct 1,000,000.00 1,377,956.51 Signed 2021-11-22 2022-03-21 2022-01-11 2022-03-29 2022-01-25 2022-06-10 2022-07-24 plementation agents de l'Etat à travers un recensement PRODIGY-C012-CS-INDV / As Digital and Mobile Governm Individual Consult Pending Impleme sistant technique pour la réd IDA / 67800 Post Open 100,000.00 0.00 2022-05-10 2022-06-28 2022-07-19 2022-08-23 2023-08-23 ent Services ant Selection ntation action du cahier de charge e -Procurement PRODIGY-2.01.04.03-1-CS-IN DV / Recrutement de 03 Assi Digital and Mobile Governm Individual Consult IDA / 67800 Post Open 135,000.00 132,339.91 Signed 2022-02-28 2022-02-11 2022-04-18 2022-03-15 2022-05-09 2022-03-18 2022-06-13 2022-05-04 2023-07-03 stants Techniques spécialist ent Services ant Selection e X-road pour l'UGD Page 10 PRODIGY-2.01.04.02-1-CS-IN DV / Recrutement de 03 Assi Digital and Mobile Governm Individual Consult stants Techniques développ IDA / 67800 Post Open 135,000.00 0.00 Signed 2022-02-25 2022-02-12 2022-04-07 2022-07-01 2022-04-17 2022-07-06 2022-05-22 2023-06-11 ent Services ant Selection eurs Full Stack pour le dévelo ppement des services transv erses par l'UGD PRODIGY-2.02.03.03-CS-IND V / Recrutement d'un Assista Digital and Mobile Governm Individual Consult IDA / 67800 Post Open 135,000.00 0.00 Terminated 2022-02-24 2022-02-24 2022-04-14 2022-04-12 2022-05-05 2022-06-21 2022-06-09 2022-07-10 2023-06-09 nt Technique dans le cadre d ent Services ant Selection e la mise en place de la télé éducation MG-PREA-278581-CS-INDV / Assistant Technique Administ rateur Bases de Données (DB Digital and Mobile Governm Individual Consult A) » pour le Ministère du dév IDA / V2950 Post Open 135,000.00 47,825.64 Signed 2022-02-25 2022-02-15 2022-04-08 2022-06-14 2022-04-22 2022-06-15 2022-05-06 2022-06-25 2024-12-31 ent Services ant Selection eloppement Numérique, de l a transformation Digitale, de s Postes et des Télécommuni cations (MNDPT) MG-PREA-278586-CS-INDV / Assistant Technique Dévelop peur Full stack pour le Minist Digital and Mobile Governm Individual Consult IDA / V2950 Post Open 135,000.00 39,836.38 Signed 2022-02-25 2022-02-15 2022-04-08 2022-06-14 2022-04-22 2022-06-16 2022-05-06 2022-06-25 2024-12-31 ère du développement Numé ent Services ant Selection rique, de la transformation Di gitale, des Postes et des Télé communications (MNDPT) MG-PREA-278588-CS-INDV / Assistant Technique Product Owner pour le Ministère du d Digital and Mobile Governm Individual Consult IDA / V2950 Post Open 135,000.00 51,706.28 Signed 2022-02-25 2022-02-15 2022-04-08 2022-07-27 2022-04-22 2022-07-27 2022-05-06 2022-08-02 2024-12-31 éveloppement Numérique, d ent Services ant Selection e la transformation Digitale, des Postes et des Télécomm unications (MNDPT) MG-PREA-278621-CS-INDV / Project Management and Im Individual Consult Assistant en Passation de Ma IDA / V2950 Post Direct 25,000.00 21,148.85 Signed 2022-02-11 2021-11-26 2022-02-21 2021-11-29 2022-03-14 2021-11-30 2022-04-18 2021-12-02 2024-12-31 plementation ant Selection rchés pour l'UCP MG-PREA-278623-CS-CDS / Project Management and Im Individual Consult IDA / V2950 Post Direct 57,000.00 54,203.04 Signed 2022-02-11 2021-04-30 2022-02-21 2021-03-15 2022-03-14 2021-03-15 2022-04-18 2021-04-27 2024-12-31 Auditeur Interne pour l'UCP plementation ant Selection MG-PREA-278627-CS-CDS / Project Management and Im Individual Consult Gestionnaire des immobilisat IDA / V2950 Post Direct 32,000.00 30,473.04 Signed 2022-02-11 2021-01-21 2022-02-21 2021-02-11 2022-03-14 2021-02-11 2022-04-18 2021-02-23 2024-12-31 plementation ant Selection ions pour l'UCP MG-PREA-278628-CS-CDS / Project Management and Im Individual Consult IDA / V2950 Post Direct 46,000.00 3,613.05 Completed 2022-02-11 2021-04-15 2022-02-21 2021-03-16 2022-03-14 2021-03-16 2022-04-18 2021-05-10 2024-12-31 2022-01-12 Chef comptable pour l'UCP plementation ant Selection MG-PREA-278629-CS-CDS / Project Management and Im Individual Consult IDA / V2950 Post Direct 33,000.00 28,979.79 Signed 2022-02-11 2021-09-15 2022-02-21 2021-12-15 2022-03-14 2021-12-17 2022-04-18 2022-01-02 2024-12-31 Comptable pour le UCP plementation ant Selection MG-PREA-278844-CS-INDV / Technicien Spécialiste en Sa Project Management and Im Individual Consult IDA / V2950 Post Direct 39,000.00 35,725.70 Signed 2022-02-28 2021-10-01 2022-03-10 2021-09-03 2022-03-31 2021-09-03 2022-05-05 2021-10-19 2024-12-30 uvegarde Environnementale plementation ant Selection et Sociale du PRODIGY MG-PREA-278846-CS-INDV / Project Management and Im Individual Consult Technicien Spécialiste en Sui IDA / 67800 Post Open 36,000.00 0.00 Canceled 2022-03-15 2022-07-20 2022-05-03 2022-05-10 2022-05-31 2024-12-31 plementation ant Selection vi et Evaluation du PRODIGY MG-PREA-278577-CS-INDV / Assistant Technique pour l'ac compagnement des équipes en Maîtrises d’Ouvrage (MOA Digital and Mobile Governm Individual Consult IDA / V2950 Post Open 135,000.00 38,610.39 Signed 2022-02-25 2022-02-21 2022-04-08 2022-08-01 2022-04-22 2022-08-02 2022-05-06 2022-08-03 2024-12-31 ) pour le Ministère du dévelo ent Services ant Selection ppement Numérique, de la tr ansformation Digitale, des Po stes et des Télécommunicati ons (MNDPT) MG-PREA-278589-CS-INDV / Assistance technique en app Digital and Mobile Governm Individual Consult IDA / V2950 Post Direct 240,000.00 198,332.94 Signed 2022-02-25 2022-03-04 2022-03-07 2022-03-08 2022-03-28 2022-03-16 2022-05-02 2022-03-18 2024-12-27 ui aux PMO dans la mise en ent Services ant Selection œuvre des programmes de r éformes du prodigy MG-PREA-278592-CS-INDV / Digital and Mobile Governm Individual Consult Coach en coordination des re IDA / V2950 Post Direct 135,000.00 0.00 Canceled 2022-02-25 2022-07-21 2022-03-07 2022-03-28 2022-05-02 2024-12-27 ent Services ant Selection censements à caractère adm inistratif MG-PREA-278593-CS-INDV / Coach de résultats rapides p Digital and Mobile Governm Individual Consult IDA / V2950 Post Direct 135,000.00 19,522.44 Signed 2022-02-25 2022-03-04 2022-03-07 2022-03-08 2022-03-28 2022-03-16 2022-05-02 2022-03-18 2024-12-27 our soutenir la gestion de ch ent Services ant Selection angement dans les reformes de l’administration PRODIGY-3.02.01.05-2-CS-C DS / Recrutement d'un cabin Project Management and Im IDA / 67800 Post Direct Selection Direct 100,000.00 0.00 Canceled 2021-11-15 2021-12-11 2021-12-06 2021-12-22 2025-06-30 et d'audit comptable et finan plementation cier pour le PRODIGY MG-PREA-281880-CS-INDV / Digital and Mobile Governm Individual Consult 02 Assistants Techniques Pro IDA / V2950 Post Open 112,000.00 82,730.04 Signed 2022-03-30 2022-03-23 2022-05-11 2022-07-22 2022-05-25 2022-07-29 2022-06-08 2022-07-30 2024-12-31 ent Services ant Selection duct Owner auprès de l'UGD MG-PREA-281882-CS-INDV / Digital and Mobile Governm Individual Consult 02 Assistants techniques AM IDA / V2950 Post Open 112,000.00 73,183.29 Signed 2022-03-30 2022-03-23 2022-05-11 2022-06-23 2022-05-25 2022-06-24 2022-06-15 2022-06-28 2024-12-31 ent Services ant Selection OA auprès de l'UGD MG-PREA-282409-CS-INDV / Project Management and Im Individual Consult Assistant Administratif et Log IDA / V2950 Post Open 22,000.00 17,318.52 Signed 2022-03-30 2022-03-11 2022-05-18 2022-03-23 2022-06-08 2022-03-24 2022-07-13 2022-04-11 2024-12-29 plementation ant Selection istique pour l’UCP MG-PREA-282410-CS-INDV / Project Management and Im Individual Consult Assistant Administratif et fina IDA / V2950 Post Open 22,000.00 14,932.18 Signed 2022-03-30 2021-11-30 2022-05-18 2022-03-27 2022-06-08 2022-05-13 2022-07-13 2022-05-17 2024-12-29 plementation ant Selection ncier pour l’UCP MG-PREA-282415-CS-INDV / Digital and Mobile Governm Individual Consult Chief Operating Officer/Servi IDA / V2950 Post Open 110,000.00 0.00 Signed 2022-03-30 2022-03-14 2022-05-18 2023-01-10 2022-06-08 2023-01-13 2022-07-13 2024-12-29 ent Services ant Selection ce Delivery Manager MG-PREA-282417-CS-INDV / Project Management and Im Individual Consult Assistant en Suivi et Evaluati IDA / V2950 Post Direct 22,000.00 15,649.44 Signed 2022-03-30 2022-03-15 2022-04-09 2022-03-21 2022-04-30 2022-03-21 2022-06-04 2022-04-29 2024-11-20 plementation ant Selection on du PRODIGY Page 11 PRODIGY-PPA-287-CS-INDV / Recrutement d’un(e) Assista Digital and Mobile Governm Individual Consult IDA / 67800 Post Open 88,000.00 0.00 Canceled 2021-07-12 2021-07-26 2021-08-30 2021-09-13 2021-10-11 2024-12-31 nt(e) Technique Consultant S ent Services ant Selection ystème d’Information Transv erse pour l’UGD PRODIGY-289-CS-INDV / Rec rutement d’un consultant ind Digital and Mobile Governm Individual Consult ividuel pour la mise en place IDA / 67800 Post Open 40,000.00 0.00 Canceled 2021-09-27 2021-09-14 2021-11-15 2021-12-06 2022-01-10 2022-05-10 ent Services ant Selection du planning de déploiement de l’identification unique a M adagascar MG-PREA-287065-CS-INDV / Project Management and Im Individual Consult IDA / V2950 Post Direct 55,000.00 40,035.06 Signed 2022-03-30 2021-12-06 2022-04-09 2021-12-15 2022-04-30 2021-12-17 2022-06-04 2022-01-13 2024-12-31 Chef comptable pour l'UCP plementation ant Selection MG-PREA-292609-CS-INDV / Digital and Mobile Governm Individual Consult Responsable de formation po IDA / 67800 Post Open 49,000.00 52,451.39 Signed 2022-05-20 2022-05-11 2022-07-08 2022-07-08 2022-07-22 2022-07-11 2022-08-19 2022-07-14 2024-12-31 ent Services ant Selection ur la composante 2 MG-PREA-296863-CS-INDV / Creation of a Consolidated a Individual Consult Open - Internationa Under Implement consultant individuel pour la IDA / 67800 nd Interoperable Identity Ma Post 70,000.00 0.00 2022-08-16 2022-11-02 2022-09-27 2023-03-07 2022-10-04 2023-03-23 2022-10-11 2023-04-09 ant Selection l ation réalisation du BPR pour l'e-G nagement System P PRODIGY-451-CS-INDV / Rec rutement d'un Technicien Sp Project Management and Im Individual Consult IDA / 67800 Post Open 42,000.00 0.00 Canceled 2021-09-06 2021-08-25 2021-10-04 2021-10-11 2021-11-01 2024-12-31 écialiste en Passation de Ma plementation ant Selection rchés II pour le PRODIGY PRODIGY-PPA-106-CS-CI / Re Creation of a Consolidated a crutement d’un assistant tec Individual Consult IDA / V2950 nd Interoperable Identity Ma Post Open 95,000.00 0.00 Canceled 2022-03-07 2022-04-25 2022-05-09 2022-05-30 2023-05-30 hnique à la réforme du cadre ant Selection nagement System juridique de l’état civil et de l ’identité PRODIGY-2.01.02.02-CS-IND Digital and Mobile Governm Individual Consult V / Assistant technique pour l IDA / 67800 Prior Open 300,000.00 0.00 Canceled 2022-02-28 2022-04-18 2022-05-09 2022-06-13 2025-02-18 ent Services ant Selection a mise à l'échelle de la soluti on X-Road MG-PREA-306814-CS-INDV / Creation of a Consolidated a Individual Consult Open - Internationa Assistance technique pour l'é IDA / 67800 nd Interoperable Identity Ma Post 20,000.00 0.00 Canceled 2022-08-24 2022-10-10 2022-10-17 2022-10-19 2023-04-17 ant Selection l laboration du cadre juridique nagement System du NUI MG-PREA-306820-CS-INDV / Creation of a Consolidated a Individual Consult Under Implement Traduction des dossiers pour IDA / 67800 nd Interoperable Identity Ma Post Open - National 20,000.00 0.00 2022-08-17 2023-01-01 2022-09-28 2022-10-03 2022-10-10 2023-04-08 ant Selection ation le projet (PAD, Document sau nagement System vegardes, etc.) MG-PREA-306831-CS-INDV / Assistant technique pour la c Creation of a Consolidated a Individual Consult Open - Internationa Pending Impleme onception des nouveaux doc IDA / 67800 nd Interoperable Identity Ma Post 200,000.00 0.00 2022-09-07 2022-10-19 2022-10-26 2022-11-02 2023-05-01 ant Selection l ntation uments d'identités, actes d'é nagement System tat civil, instruments juridiqu es et outils de gestion MG-PREA-306836-CS-CDS / Creation of a Consolidated a Direct - Internation Under Implement Assistant technique pour la IDA / 67800 nd Interoperable Identity Ma Post Direct Selection 300,000.00 0.00 2022-08-15 2023-03-21 2022-08-25 2023-04-07 2022-10-29 2023-04-27 al ation mise à l'échelle de la solution nagement System X-Road MG-PREA-316488-CS-INDV / Project Management and Im Individual Consult IDA / 67800 Post Open - National 29,000.00 0.00 Signed 2022-09-30 2022-09-24 2022-11-18 2022-12-26 2022-12-09 2022-12-27 2023-01-13 2024-12-31 Chef comptable UCP plementation ant Selection MG-PREA-316525-CS-INDV / Digital and Mobile Governm Individual Consult Assistant technique spécialist IDA / 67800 Post Open - National 39,000.00 0.00 Signed 2022-09-23 2022-09-30 2022-11-11 2022-11-15 2022-12-02 2022-11-16 2023-01-06 2024-12-31 ent Services ant Selection e en UX/UI Designer UGD MG-PREA-316530-CS-INDV / Digital and Mobile Governm Individual Consult Assistant technique à maîtris IDA / 67800 Post Open - National 39,000.00 0.00 Canceled 2022-09-30 2022-09-26 2022-11-18 2022-12-02 2022-12-23 2024-12-31 ent Services ant Selection e d'ouvrage (AMOA) UGD MG-PREA-316538-CS-INDV / Project Management and Im Individual Consult Under Implement IDA / 67800 Post Open - National 16,000.00 0.00 2022-09-30 2022-12-21 2022-11-18 2023-01-27 2022-12-09 2023-02-22 2023-01-06 2024-12-31 Assistant(e) de Direction UG plementation ant Selection ation D MG-PREA-319199-CS-INDV / Creation of a Consolidated a Individual Consult Assistant Technique en gesti IDA / 67800 nd Interoperable Identity Ma Post Open - National 30,000.00 0.00 Signed 2022-12-22 2022-12-13 2023-02-01 2023-01-19 2023-02-11 2023-01-23 2023-03-18 2024-03-17 ant Selection on de projet auprès du Minist nagement System ère de la Justice MG-PREA-317864-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement 02 Assistants techniques Sys IDA / 67800 Post Open - National 101,400.00 0.00 2022-11-28 2022-11-18 2023-01-16 2023-02-22 2023-02-06 2023-02-24 2023-03-13 2024-12-31 ent Services ant Selection ation tème d’Information Transver se pour l’UGD MG-PREA-317870-CS-INDV / Assistant technique national Digital and Mobile Governm Individual Consult content designer pour l'intég IDA / 67800 Post Open - National 50,700.00 0.00 Signed 2022-11-25 2022-11-18 2023-01-13 2022-12-27 2023-02-03 2022-12-30 2023-03-10 2024-12-31 ent Services ant Selection ration des informations et de s services dans le cadre du P ortail Unique PRODIGY-270-3--CS-INDV / R ecrutement d'un Assistant Te Digital and Mobile Governm Individual Consult IDA / V2950 Prior Open 350,000.00 0.00 Canceled 2021-09-13 2022-03-18 2021-11-01 2021-11-22 2021-12-27 2024-12-31 chnique Chief Digital Officer ent Services ant Selection auprès de la Présidence PRODIGY-2.02.03.02-CS-IND V / Recrutement d'un Assista Digital and Mobile Governm Individual Consult nt Technique pour appuyer l’ IDA / 67800 Post Open 135,000.00 0.00 Canceled 2022-02-28 2022-02-24 2022-04-18 2022-05-09 2022-06-13 2023-06-13 ent Services ant Selection UGD à l’identification des bes oins pour le système solution Télémédecine MG-PREA-318013-CS-INDV / Assistant technique spécialist e en Autorité de Certification, Digital and Mobile Governm Individual Consult Open - Internationa Pending Impleme IDA / 67800 Post 85,800.00 0.00 2022-11-30 2023-01-18 2023-02-08 2023-03-15 2024-12-24 Horodatage pour la gestion d ent Services ant Selection l ntation es certificats, des signatures et des notifications au sein d e l'UGD MG-PREA-306829-CS-INDV / Creation of a Consolidated a Assistant technique pour éla Individual Consult IDA / 67800 nd Interoperable Identity Ma Post Open - National 26,400.00 0.00 Canceled 2022-09-02 2022-10-19 2022-10-22 2022-10-24 2023-03-23 borer les normes et standard ant Selection nagement System s en organisation, agenceme nt et réhabilitation MG-PREA-330765-CS-INDV / Creation of a Consolidated a Chargé de projet dédié aux c Individual Consult IDA / V2950 nd Interoperable Identity Ma Post Open - National 44,850.00 0.00 Signed 2022-12-28 2022-12-19 2023-02-08 2023-02-22 2023-02-22 2023-02-24 2023-03-13 2024-12-31 hantiers d'équipement de ser ant Selection nagement System vices publics locaux Page 12 MG-PREA-325603-CS-INDV / Digital and Mobile Governm Individual Consult Open - Internationa Under Implement Chief Digital Officer auprès d IDA / V2950 Post 143,000.00 0.00 2023-01-11 2023-01-11 2023-03-01 2023-05-04 2023-03-22 2023-04-26 2024-12-31 ent Services ant Selection l ation e la Présidence MG-PREA-343246-CS-INDV / Project Management and Im Individual Consult IDA / 67800 Post Open - National 8,100.00 0.00 Signed 2023-02-20 2023-02-27 2023-03-26 2023-03-23 2023-03-31 2023-03-24 2023-04-07 2024-12-31 Assistante de Direction UCP plementation ant Selection MG-PREA-343311-CS-INDV / Digital and Mobile Governm Individual Consult Open - Internationa Assistant Technique DevCCO IDA / 67800 Post 46,000.00 0.00 Signed 2023-02-23 2023-02-27 2023-04-13 2023-04-14 2023-04-20 2023-04-17 2023-05-02 2024-12-31 ent Services ant Selection l ps Manager MG-PREA-343330-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement IDA / 67800 Post Open - National 44,000.00 0.00 2023-02-22 2023-02-27 2023-04-12 2023-04-14 2023-04-17 2023-04-17 2023-04-27 2024-12-31 Assistant Technique DevOps ent Services ant Selection ation MG-PREA-343334-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement IDA / 67800 Post Open - National 44,000.00 0.00 2023-02-22 2023-02-27 2023-04-12 2023-05-17 2023-04-17 2023-05-19 2023-04-27 2024-12-31 Assistant Technique Data An ent Services ant Selection ation alyst MG-PREA-343336-CS-INDV / Digital and Mobile Governm Individual Consult Pending Impleme IDA / 67800 Post Open - National 48,000.00 0.00 2023-02-22 2023-03-27 2023-04-01 2023-04-11 2024-12-31 Spécialistes des Données ent Services ant Selection ntation MG-PREA-343342-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement Chargé de projet - Laboratoir IDA / 67800 Post Open - National 45,000.00 0.00 2023-02-22 2023-03-27 2023-03-27 2023-04-01 2023-04-11 2024-12-31 ent Services ant Selection ation e Toamasina PRODIGY-PPA-108-CS-CI / Re crutement d’un assistant tec Creation of a Consolidated a Individual Consult hnique au développement du IDA / V2950 nd Interoperable Identity Ma Post Open 95,000.00 0.00 Canceled 2021-05-03 2022-08-02 2021-06-21 2021-07-05 2021-07-26 2024-12-31 ant Selection système informatique de l’ét nagement System at civil et de l’identité MG-PREA-318325-CS-INDV / Creation of a Consolidated a Assistant technique AMOA po Individual Consult IDA / V2950 nd Interoperable Identity Ma Post Open - National 50,700.00 0.00 Canceled 2022-11-25 2022-11-18 2023-01-13 2023-01-27 2023-02-17 2024-12-13 ur appuyer le MID dans la réa ant Selection nagement System lisation de la réforme MG-PREA-282171-CS-INDV / Assistant Technique Consulta Digital and Mobile Governm Individual Consult IDA / 67800 Post Open 88,000.00 0.00 Canceled 2022-03-30 2022-05-18 2022-06-01 2022-06-29 2024-12-31 nt Système d’Information Tra ent Services ant Selection nsverse pour l’UGD MG-PREA-347472-CS-INDV / Assistance Technique pour la Digital and Mobile Governm Individual Consult Direct - Internation Under Implement IDA / 67800 Post 71,000.00 0.00 2023-03-10 2023-03-20 2023-03-22 2023-03-20 2023-04-05 2023-04-14 2023-12-31 Transformation Digitale de l’ ent Services ant Selection al ation Administration Fiscale Malag asy MG-PREA-347480-CS-INDV / Assistant Technique Business Digital and Mobile Governm Individual Consult Direct - Internation Analyst et Gestion opération IDA / 67800 Post 150,000.00 0.00 Signed 2023-03-10 2023-03-20 2023-03-22 2023-03-20 2023-04-05 2023-04-05 2023-04-14 2024-04-13 ent Services ant Selection al nelle & coaching d'équipe po ur l’Administration Fiscale Ma lagasy MG-PREA-347500-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement Assistant Technique Expert e IDA / 67800 Post Open - National 52,500.00 0.00 2023-03-10 2023-03-20 2023-04-17 2023-04-24 2023-04-29 2024-12-31 ent Services ant Selection ation n Cybersécurité MG-PREA-347998-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement Assistant Technique Expert e IDA / 67800 Post Open - National 70,000.00 0.00 2023-03-17 2023-03-21 2023-04-24 2023-05-01 2023-05-10 2024-12-31 ent Services ant Selection ation n Data Governance MG-PREA-318075-CS-INDV / Assistant Technique Administ Digital and Mobile Governm Individual Consult IDA / V2950 Post Open - National 50,700.00 0.00 Canceled 2022-11-28 2023-01-09 2023-01-23 2023-02-11 2024-12-31 rateur Bases de Données (DB ent Services ant Selection A) » pour le MNDPT MG-PREA-343335-CS-INDV / Digital and Mobile Governm Individual Consult Assistant Technique en Assis IDA / 67800 Post Open - National 44,000.00 0.00 Canceled 2023-02-22 2023-02-27 2023-04-12 2023-04-17 2023-04-27 2024-12-31 ent Services ant Selection tance à Maitrise d’Ouvrage S enior MG-PREA-347491-CS-INDV / Digital and Mobile Governm Individual Consult Assistant Technique en Assis IDA / 67800 Post Open - National 45,000.00 0.00 Canceled 2023-03-10 2023-03-20 2023-04-14 2023-04-21 2023-04-24 2024-12-31 ent Services ant Selection tance à Maîtrise d’Ouvrage S enior MG-PREA-347490-CS-INDV / Digital and Mobile Governm Individual Consult IDA / 67800 Post Open - National 45,000.00 0.00 Canceled 2023-03-10 2023-03-20 2023-04-14 2023-04-21 2023-04-24 2024-12-31 Assistant Technique Product ent Services ant Selection Owner PRODIGY-PPA-105-CS-CI / Re crutement d'un Assistant Tec Creation of a Consolidated a hnique au développement du Individual Consult IDA / V2950 nd Interoperable Identity Ma Post Open 95,000.00 0.00 Canceled 2021-07-01 2022-08-02 2021-08-17 2021-09-07 2021-10-12 2024-12-31 système d’information de l’ét ant Selection nagement System at civil et de l’identité, et à la numérisation des registres d’ état civil PRODIGY-C016-CS-INDV / Re Creation of a Consolidated a Individual Consult crutement d'un Consultant in IDA / 67800 nd Interoperable Identity Ma Post Open 90,000.00 0.00 Canceled 2022-02-28 2022-04-18 2022-05-09 2022-06-13 2023-06-13 ant Selection dividuel pour l'opérationnalis nagement System ation du CNECI MG-PREA-306842-CS-INDV / Creation of a Consolidated a Assistant technique pour app Individual Consult Open - Internationa IDA / 67800 nd Interoperable Identity Ma Post 19,800.00 0.00 Canceled 2022-08-16 2022-08-18 2022-09-27 2022-10-04 2022-10-11 2023-04-09 uyer les entités concernés pa ant Selection l nagement System r la RECI dans l'élaboration d u décret SIECM MG-PREA-306799-CS-INDV / Creation of a Consolidated a Individual Consult Open - Internationa Assistant technique pour éla IDA / 67800 nd Interoperable Identity Ma Post 162,000.00 0.00 Canceled 2022-08-19 2022-09-30 2022-10-07 2022-10-14 2023-10-14 ant Selection l boration de la stratégie sur la nagement System biométrie MG-PREA-306826-CS-INDV / Creation of a Consolidated a Assistance technique pour la Individual Consult Open - Internationa IDA / 67800 nd Interoperable Identity Ma Post 277,200.00 0.00 Canceled 2022-08-29 2022-10-10 2022-10-17 2022-10-24 2023-04-22 gestion de projet et la directi ant Selection l nagement System on de programme de la cond uite de changement MG-PREA-306844-CS-INDV / Creation of a Consolidated a Individual Consult Open - Internationa Coach 1 en transformation di IDA / 67800 nd Interoperable Identity Ma Post 216,000.00 0.00 Canceled 2022-10-10 2022-11-21 2022-11-28 2022-12-05 2023-06-03 ant Selection l gitale nagement System MG-PREA-318073-CS-INDV / Digital and Mobile Governm Individual Consult Assistant Technique Dévelop IDA / 67800 Post Open - National 65,000.00 0.00 Canceled 2022-10-27 2022-12-07 2022-12-17 2023-01-21 2024-12-06 ent Services ant Selection peur Full Stack MG-PREA-318333-CS-INDV / Project Management and Im Individual Consult IDA / 67800 Post Open - National 27,000.00 0.00 Canceled 2022-10-28 2022-12-14 2022-12-28 2023-01-25 2024-12-12 Assistant programme de l'UC plementation ant Selection P Page 13 MG-PREA-343345-CS-INDV / AT pour accompagner la dire Digital and Mobile Governm Individual Consult ction générale du CNECI dan IDA / 67800 Post Open - National 50,000.00 0.00 Canceled 2023-02-22 2023-03-27 2023-04-01 2023-04-11 2024-12-31 ent Services ant Selection s l'élaboration des MOP et au tres documents techniques MG-PREA-353249-CS-INDV / Project Management and Im Individual Consult Under Implement IDA / 67800 Post Open - National 42,000.00 0.00 2023-04-13 2023-04-03 2023-05-22 2023-05-25 2023-05-31 2024-12-31 Coordonnateur de Projet PRO plementation ant Selection ation DIGY MG-PREA-353509-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement Expert en Système d’Informa IDA / 67800 Post Open - National 30,000.00 0.00 2023-04-12 2023-04-03 2023-05-15 2023-05-20 2023-05-30 2024-12-31 ent Services ant Selection ation tion pour le MNDPT MG-PREA-356662-CS-INDV / Project Management and Im Individual Consult Under Implement Responsable Administratif et IDA / 67800 Post Open - National 24,855.00 0.00 2023-04-27 2023-05-03 2023-06-15 2023-06-20 2023-07-25 2024-12-15 plementation ant Selection ation Financier du PRODIGY MG-PREA-354120-CS-INDV / Creation of a Consolidated a Individual Consult Pending Impleme AT spécialiste en infrastructu IDA / 67800 nd Interoperable Identity Ma Post Open - National 28,000.00 0.00 2023-04-19 2023-06-07 2023-06-28 2023-08-02 2024-12-02 ant Selection ntation re nagement System MG-PREA-360058-CS-CDS / Digital and Mobile Governm Direct - Internation Cabinet spécialisé en recrute IDA / 67800 Post Direct Selection 200,000.00 0.00 Signed 2023-05-10 2023-05-08 2023-05-20 2023-05-08 2023-06-01 2023-11-28 ent Services al ment des personnels clés du projet MG-PREA-360150-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement Responsable des Ressources IDA / 67800 Post Open - National 36,125.00 0.00 2023-05-31 2023-05-08 2023-07-19 2023-07-24 2023-08-28 2024-12-31 ent Services ant Selection ation Humaines UGD MG-PREA-360161-CS-INDV / Digital and Mobile Governm Individual Consult Under Implement Chef des partenariats pour l' IDA / 67800 Post Open - National 41,650.00 0.00 2023-05-30 2023-05-08 2023-07-18 2023-07-23 2023-08-27 2024-12-30 ent Services ant Selection ation unité de gouvernance digital e (UGD) MG-PREA-361088-CS-INDV / Digital and Mobile Governm Individual Consult Assistant Technique Chef de l IDA / 67800 Post Direct - National 107,250.00 0.00 Signed 2023-05-12 2023-05-22 2023-05-14 2023-05-26 2023-05-15 2023-05-30 2023-05-17 2024-12-08 ent Services ant Selection a Technologie MG-PREA-348438-CS-INDV / Digital and Mobile Governm Individual Consult Assistant Technique Chef de l IDA / 67800 Post Open - National 105,000.00 0.00 Canceled 2023-03-15 2023-03-28 2023-04-17 2023-04-22 2023-05-02 2024-12-31 ent Services ant Selection a Technologie Page 14 PROCUREMENT PLAN (Textual Part) Project Country: Kyrgyz Republic information Full Project Name: Regional Economic Development Project (RED) Total Finance ($): USD 60,000,000 Project Number: P167428 Project Implementation agency Community Development and Investment Agency of the Kyrgyz Republic (ARIS) Date of the Procurement Plan February 5, 2020 Period covered by this Procurement September 2020 – December, 2026 Plan: Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), procurement under World Bank financed operations may be carried out in accordance with “Single-Stage Bidding” method set forth in the Public Procurement Law of the Kyrgyz Republic dated April 3, 2015 № 72 (the “PPL”) with amendments dated November 18, 2016 No. 182, December 10, 2016 No. 195, February 14, 2017 No. 25, May 30, 2017 No. 93, March 29, 2018 No. 32, January 11, 2019 No. 4, June 26, 2019 No. 76, provided that such arrangements continue to meet requirements of the paragraph 5.4 of the Procurement Regulations and the following conditions: • The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; • Bidding documents, including contract forms, acceptable to the Bank shall be used. Bidding documents shall include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social, health and safety (“ESHS”) risks and impacts. • The Bidding process shall not be cancelled solely on the reason that minimum bid price is larger than the amount allocated by procuring entity for the procurement. • There shall be no preference applied during procurement of goods and works. • Implementing agency shall have an option to publish procurement notice without disclosing cost estimate. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Other national procurement arrangements such as “Simplified Method” (Request for Quotation) may be applied on the same conditions stated above for procuring limited quantities of readily available off-the-shelf goods or simple civil works of small value. In addition, not less than three quotations shall be requested to ensure competition. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable; Works: is not applicable. PROCUREMENT Kyrgyz Republic : Kyrgyz Republic Regional Economic Development Project PLAN General Information Country: Kyrgyz Republic 2021-03-03 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167428 GPN Date: 2020-09-16 Project Name: Kyrgyz Republic Regional Economic Development Project Loan / Credit No: IDA / 65580 Community Development and Investment Agency Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-REDP-W-RFQ-2021-1 / O Improving Regional Economi Request for Quota Single Stage - One E Pending Imp 2023-07-2 ffice repair for Osh technical IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2021-06-10 2021-07-23 tions nvelope lementation 3 agricultural college unctions IDA-REDP-W-RFQ-2021-2 / O Improving Regional Economi Request for Quota Single Stage - One E Pending Imp 2022-07-2 IDA / 65580 Post Open - National 0.00 2021-06-10 2021-07-23 ffice repair of Laboratory IST c Planning and Regulatory F tions nvelope lementation 3 A unctions IDA-REDP-W-RFQ-2021-3 / R Improving Regional Economi Request for Quota Single Stage - One E Pending Imp 2022-07-2 econstruction of driving field IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2021-06-10 2021-07-16 tions nvelope lementation 3 s for Osh technical agricultur unctions al college IDA-REDP-W-RFB-2021-4 / Pr Catalyzing Investments for T ovision of tourism services a Single Stage - One E Pending Imp 2023-09-1 IDA / 65580 ourism and Urban Developm Post Request for Bids Open - National 0.00 2021-06-10 2021-06-10 2021-07-15 2021-08-05 2021-08-22 nd amenities (eg. rest stops) nvelope lementation 1 ent along the main circuits IDA-REDP-W-RFQ-2021-8 / O Improving Regional Economi Request for Quota Single Stage - One E Pending Imp 2023-01-2 ffice repair for Osh technolog IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2021-12-17 2022-01-22 tions nvelope lementation 9 ical university unctions IDA-REDP-W-RFB-2021-6 / S uleiman-Too Museum and Co mplex upgrading and Uzgen Catalyzing Investments for T Open - Internationa Single Stage - Two E Pending Imp 2023-11-0 Museum and grounds upgrad IDA / 65580 ourism and Urban Developm Prior Request for Bids 0.00 2021-06-13 2021-06-18 2021-07-30 2021-10-12 2021-11-16 l nvelope lementation 6 ing (including infra, services, ent exhibition organization, mus eum site and visitor manage ment plan etc.) IDA-REDP-W-RFB-2021-7 / A Catalyzing Investments for T Single Stage - One E Pending Imp 2023-12-2 bshir-Ata: Kara-Shoro Park Ky IDA / 65580 ourism and Urban Developm Post Request for Bids Open - National 0.00 2021-06-13 2021-06-13 2021-08-01 2021-08-22 2021-09-11 nvelope lementation 0 rgyz-Ata: infrastructure impr ent ovement IDA-REDP-W-RFQ-2022-9 / O Improving Regional Economi Request for Quota Single Stage - One E Pending Imp 2023-07-3 IDA / 65580 Post Open - National 0.00 2022-06-17 2022-07-30 ffice repair of Interdistrict La c Planning and Regulatory F tions nvelope lementation 0 boratories unctions IDA-REDP-W-RFB-2021-5 / " Osh City downtown and key and Uzgen City urban regen Catalyzing Investments for T Open - Internationa Single Stage - Two E 2023-11-0 eration (roads, parks and oth IDA / 65580 ourism and Urban Developm Prior Request for Bids 0.00 Canceled 2021-06-13 2021-06-18 2021-07-30 2021-10-12 2021-11-16 l nvelope 6 er public spaces, utilities, etc ent .) (roads, parks and other pu blic spaces, pedestrian bridges a cross river, utilities, etc.)" IDA-REDP-W-RFB-2022-14 / Catalyzing Investments for T Other (with fi Construction works: Tynchtyk Open - Internationa Single Stage - One E Pending Imp 2023-09-0 IDA / 65580 ourism and Urban Developm Post Request for Bids eld for expla 0.00 2022-11-15 2022-12-04 2023-01-03 2023-01-24 2023-03-05 park, park near the stadium, l nvelope lementation 1 ent nation) stadium, park bridge. IDA-REDP-W-RFB-2022-11 / I mprove and landscape the le Catalyzing Investments for T Other (with fi ft and right banks and shore Single Stage - One E 2024-04-2 IDA / 65580 ourism and Urban Developm Post Request for Bids Open - National eld for expla 0.00 Canceled 2023-01-23 2023-01-27 2023-01-31 2023-03-02 2023-04-01 2023-04-23 strengthening works at the A nvelope 2 ent nation) k-Bura river in Osh city starti ng from Navoi street to Vakh apov street IDA-REDP-W-RFB-2022-11/1 / Procurement of works for wi Request for B dening the sidewalk with lan Catalyzing Investments for T ids - Small W Single Stage - One E Under Imple 2024-05-1 dscaping and improvement o IDA / 65580 ourism and Urban Developm Post Request for Bids Open - National orks SPD (1 e 0.00 2023-01-31 2023-02-01 2023-02-05 2023-02-01 2023-03-19 2023-04-18 2023-05-23 nvelope mentation 7 f the coast of the Ak-Buura ri ent nvelope proc ver at the section of B. Nurm ess) atov and A. Navoi streets (on the part of Tileke-Batyr stree t) IDA-REDP-W-RFB-2022-10 / Catalyzing Investments for T Other (with fi Construction works: Open - Internationa Single Stage - One E 2023-04-0 IDA / 65580 ourism and Urban Developm Post Request for Bids eld for expla 0.00 Canceled 2022-06-17 2022-07-06 2022-08-05 2022-08-15 2022-10-05 Theater park, Toktogul theat l nvelope 3 ent nation) er and Navoi park. IDA-REDP-W-RFB-2023-1 / I mprovement of the territory Catalyzing Investments for T Other (with fi Single Stage - One E Pending Imp 2023-08-2 of the Osh National Drama T IDA / 65580 ourism and Urban Developm Post Request for Bids Open - National eld for expla 0.00 2023-04-14 2023-04-19 2023-05-31 2023-06-30 2023-08-04 nvelope lementation 8 heater named after S. Ibraim ent nation) ov located on the street. Kur manzhan-Datka IDA-REDP-W-RFB-2023-2 / R Catalyzing Investments for T Other (with fi econstruction of the central s Single Stage - One E Pending Imp 2023-09-1 IDA / 65580 ourism and Urban Developm Post Request for Bids Open - National eld for expla 0.00 2023-04-21 2023-04-26 2023-06-07 2023-07-07 2023-08-11 quare of Osh city on Lenin St nvelope lementation 6 ent nation) reet No. 220/2 in MTU No. 2 Sulaiman-Too IDA-REDP-W-RFB-2023-3 / R epair of the existing building of the summer theater name Catalyzing Investments for T Other (with fi d after T. Satylganov with th Single Stage - One E Pending Imp 2024-02-0 IDA / 65580 ourism and Urban Developm Post Request for Bids Open - National eld for expla 0.00 2023-04-21 2023-04-26 2023-06-07 2023-07-07 2023-08-11 e construction of a canopy fo nvelope lementation 7 ent nation) r the auditorium of the summ er theater at the address: Le nina str. b/n in MTU № 2 "Sul aiman-Too" Osh city IDA-REDP-W-RFB-2022-12 / Construction works: Zones b Catalyzing Investments for T Other (with fi Open - Internationa Single Stage - One E Pending Imp 2023-07-0 etween residential quarters / IDA / 65580 ourism and Urban Developm Post Request for Bids eld for expla 0.00 2022-09-15 2022-10-04 2022-10-24 2022-11-23 2023-01-03 l nvelope lementation 2 blocks, wall painting (mosaic) ent nation) , northern part of Lenin stree t. Page 1 IDA-REDP-W-RFB-2023-4 / R Catalyzing Investments for T Other (with fi econstruction of the park on Single Stage - One E Pending Imp 2024-08-2 IDA / 65580 ourism and Urban Developm Post Request for Bids Open - National eld for expla 0.00 2023-05-15 2023-05-20 2023-07-01 2023-07-31 2023-09-04 Sai Boyu Street b/n in MTU № nvelope lementation 9 ent nation) 2 "Sulaiman-Too" of Osh city IDA-REDP-RFB-WORKS-VC"A PPLE"-2023-1 / Rehabilitation Other (with fi Strengthening Agri-Food Sup Single Stage - Two E Pending Imp 2024-05-3 works for the leader of the V IDA / 65580 Post Request for Bids Open - National eld for expla 0.00 2023-06-30 2023-07-05 2023-08-16 2023-10-29 2023-12-03 ply Chains and SMEs nvelope lementation 1 C "Apple" and for the benefic nation) iaries of the VC "Apple" (2 Lo ts) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-REDP-GOODS-RFQ-2020 Improving Regional Economi Request for Quota Single Stage - One E Pending Impl -1 / PCs for the office of infor IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2020-12-20 2021-02-16 2021-08-15 tions nvelope ementation mation market system unctions IDA-REDP-GOODS-RFQ-2021 Improving Regional Economi Request for Quota Single Stage - One E Pending Impl IDA / 65580 Post Open - National 0.00 2021-12-15 2022-01-23 2022-04-23 -5 / Tractor with equipment c Planning and Regulatory F tions nvelope ementation unctions IDA-REDP-GOODS-RFQ-2022 Improving Regional Economi Request for Quota Single Stage - One E Pending Impl -11 / Special vehicle for testi IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2022-02-23 2022-04-23 2022-10-20 tions nvelope ementation ng points of expertise of crop unctions s IDA-REDP-GOODS-RFB-2022- 12 / Abshir-Ata, Kara-Shoro P ark, Kyrgyz-Ata: goods for to Catalyzing Investments for T Open - Internationa Single Stage - One E Pending Impl urist infrastructure upgrading IDA / 65580 ourism and Urban Developm Post Request for Bids 0.00 2022-01-13 2022-01-18 2022-03-01 2022-03-31 2022-05-05 2023-04-30 l nvelope ementation and solid waste management ent improvements ; Trucks and b ins for Kyrgyz-Ata, Abshyr-At a, Karashoroo IDA-REDP-GOODS-RFB-2022- Improving Regional Economi 9 / Mechanization and electrif Single Stage - One E Pending Impl IDA / 65580 c Planning and Regulatory F Post Request for Bids Open - National 0.00 2022-08-11 2022-08-11 2022-08-25 2022-08-28 2022-09-16 2022-12-15 ication of agriculture for Osh nvelope ementation unctions technical agricultural college IDA-REDP-GOODS-RFQ-2022 Improving Regional Economi Request for Quota Single Stage - One E Pending Impl -10 / Promotion materials for IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2022-06-26 2022-07-30 2022-11-06 tions nvelope ementation National Stakeholders platfor unctions m IDA-REDP-GOODS-RFB-2022- Catalyzing Investments for T 13 / Furniture, goods and exi Open - Internationa Single Stage - One E Pending Impl IDA / 65580 ourism and Urban Developm Post Request for Bids 0.00 2022-08-10 2022-08-15 2022-09-26 2022-10-26 2022-11-30 2023-05-29 bition equipment for Suleimq l nvelope ementation ent n-Too and Uzgen museums IDA-REDP-GOODS-RFQ-2021 Improving Regional Economi Request for Quota Single Stage - One E Pending Impl -6 / Software for information IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2021-12-12 2022-01-20 2022-04-20 tions nvelope ementation market system unctions IDA-REDP-GOODS-RFB-2023- 18 / Purchase of goods (traini ng materials, printed materia Supporting Tourism and Rur Single Stage - Two E Pending Impl ls, etc.) for training in the hos IDA / 65580 al Development through Sm Post Request for Bids Open - National 0.00 2022-01-02 2022-01-07 2022-02-18 2022-05-03 2022-06-07 2022-12-04 nvelope ementation pitality industry for tour guid all Grants es, tour operators and mana gers / accommodation perso nnel. Technical support IDA-REDP-GOODS-RFB-2023- Improving Regional Economi Single Stage - One E 15 / Goods for Implementatio IDA / 65580 c Planning and Regulatory F Post Request for Bids Open - National 0.00 Canceled 2023-01-10 2023-01-17 2023-01-31 2023-02-21 2023-03-10 2023-09-06 nvelope n of acitivities suggested by t unctions he REDP IDA-REDP-GOODS-RFB-2023- Improving Regional Economi Single Stage - One E 16 / Goods for regional onlin IDA / 65580 c Planning and Regulatory F Post Request for Bids Open - National 0.00 Canceled 2023-01-10 2023-01-17 2023-01-31 2023-02-21 2023-03-10 2023-09-06 nvelope e platform development unctions IDA-REDP-GOODS-RFB-2021- Catalyzing Investments for T Open - Internationa Single Stage - One E 7 / Goods for Branding, mark IDA / 65580 ourism and Urban Developm Post Request for Bids 0.00 Canceled 2021-10-01 2021-10-06 2021-11-17 2021-12-17 2022-01-21 2022-04-21 l nvelope eting and promotion activitie ent s for Osh region IDA-REDP-GOODS-RFB-2022- 14 / Ensuring the product de Catalyzing Investments for T Open - Internationa Single Stage - One E velopment at the regional lev IDA / 65580 ourism and Urban Developm Post Request for Bids 0.00 Canceled 2022-03-10 2022-03-13 2022-04-24 2022-05-24 2022-06-28 2022-12-25 l nvelope el (fairs, exhibitions, PR, med ent ia campaigns, cultural events , forums) IDA-REDP-GOODS-RFB-2023- Improving Regional Economi Single Stage - One E Pending Impl 20 / Goods for regional onlin IDA / 65580 c Planning and Regulatory F Post Request for Bids Open - National 0.00 2023-01-10 2023-01-15 2023-02-04 2023-02-24 2023-03-10 2023-09-06 nvelope ementation e platform development unctions IDA-REDP-GOODS-RFB-2023- Improving Regional Economi Open - Internationa Single Stage - One E Pending Impl 19 / Goods for Implementatio IDA / 65580 c Planning and Regulatory F Post Request for Bids 0.00 2023-01-10 2023-01-15 2023-01-30 2023-02-14 2023-03-21 2023-09-17 l nvelope ementation n of acitivities suggested by t unctions he REDP IDA-REDP-GOODS-RFQ-2021 -4 / Printing of education mat erials on veterinary, artificial Improving Regional Economi Request for Quota Single Stage - One E Pending Impl insemination, mechanization IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2022-07-05 2022-08-13 2022-11-11 tions nvelope ementation and electrification of agricult unctions ure for Osh agricolledge and printing education materials f or Osh technological universi ty IDA-REDP-GOODS-RFB-2022- 15 / Ensuring the product de Catalyzing Investments for T Open - Internationa Single Stage - One E Pending Impl velopment at the regional lev IDA / 65580 ourism and Urban Developm Post Request for Bids 0.00 2022-03-10 2022-03-15 2022-04-24 2022-05-24 2022-06-26 2022-12-25 l nvelope ementation el (fairs, exhibitions, PR, med ent ia campaigns, cultural events , forums). IDA-REDP-GOODS-RFQ-2022 Catalyzing Investments for T -17 / Handouts for participant Request for Quota Single Stage - One E IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Canceled 2022-09-13 2022-09-28 2022-10-28 s of the Regional Tourism For tions nvelope ent um "Sustainable Tourism De velopment Together" IDA-REDP-PP-GOODS-RFQ-20 23-1/1 / Apple tree seedlings Strengthening Agri-Food Sup Request for Quota Single Stage - One E IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-26 2023-03-10 for "Apple" Productive Partne ply Chains and SMEs tions nvelope rship : Golden Delicious (M9 r ootstock) Page 2 IDA-REDP-PP-GOODS-RFQ-20 23-1/3 / Apple tree seedlings Strengthening Agri-Food Sup Request for Quota Single Stage - One E for "Apple" Productive Partne IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-23 2023-08-22 ply Chains and SMEs tions nvelope rship : Red Chif (MM 106 root stock),Red Chif (M9 rootstock ), Gala Must (M9 rootstock) IDA-REDP-PP-GOODS-RFQ-20 23-1/4 / Apple trees seedling Strengthening Agri-Food Sup Request for Quota Single Stage - One E s for "Apple" Productive Par IDA / 65580 Post Open - National 0.00 Canceled 2023-02-10 2023-03-09 2023-09-05 ply Chains and SMEs tions nvelope tnership for IE Boydonov S. a nd СHС "Baglan": Gala (M9 r ootstock) IDA-REDP-PP-GOODS-RFQ-20 23-2/1 / Cherry tree seedling for "Acoustic fruit and vegeta Strengthening Agri-Food Sup Request for Quota Single Stage - One E ble freezing" Product Partner IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-23 2023-08-22 ply Chains and SMEs tions nvelope ship: Cordia (Maxma 14 roots tock), Valovaya 3 (cherry ro otstock), Regina (Maxma 14 r ootstock) IDA-REDP-PP-GOODS-RFQ-20 23-2/3 / Pear tree seedlings f or "Acoustic fruit and vegeta Strengthening Agri-Food Sup Request for Quota Single Stage - One E IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-23 2023-03-10 ble freezing" Product Partner ply Chains and SMEs tions nvelope ship: Santa Maria (ВА 29 Po llinator), Carmen (ВА 29 Polli nator),Williams (ВА 29 Pollina tor) IDA-REDP-PP-GOODS-RFQ-20 23-2/4 / Seedlings of remont Strengthening Agri-Food Sup Request for Quota Single Stage - One E ant strawberries for "Acousti IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-23 2023-08-22 ply Chains and SMEs tions nvelope c fruit and vegetable freezing " Product Partnership: Clery, Black Prince IDA-REDP-PP-GOODS-RFQ-20 23-1/5 / Apple trees seedling Strengthening Agri-Food Sup Request for Quota Single Stage - One E s for "Apple" Productive Par IDA / 65580 Post Open - National 0.00 Canceled 2023-02-10 2023-03-09 2023-09-05 ply Chains and SMEs tions nvelope tnership for "Termez" Agricu ltural Production Cooperative : Gala (M9 rootstock) IDA-REDP-PP-GOODS-RFQ-20 23-1/2 / Cherry tree seedling Strengthening Agri-Food Sup Request for Quota Single Stage - One E IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-23 2023-03-10 s for "Apple" Productive Part ply Chains and SMEs tions nvelope nership : Regina, Cordia (Max ma 14 rootstock) IDA-REDP-PP-GOODS-RFQ-20 23-1/6 / Apple tree seedlings Strengthening Agri-Food Sup Request for Quota Single Stage - One E IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-23 2023-03-10 for "Apple" Productive Partn ply Chains and SMEs tions nvelope ership for LLC "Agrocomplex ": Gala (M9 rootstock) IDA-REDP-PP-GOODS-RFQ-20 23-2/5 / Seedlings for "Acous Strengthening Agri-Food Sup Request for Quota Single Stage - One E tic fruit and vegetable freezin IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-23 2023-08-22 ply Chains and SMEs tions nvelope g" Product Partnership of Plu m Leto and Raspberry Polka IDA-REDP-PP-GOODS-RFQ-20 23-1/7 / Apple tree seedlings Strengthening Agri-Food Sup Request for Quota Single Stage - One E IDA / 65580 Post Open - National 0.00 Canceled 2023-02-06 2023-03-01 2023-03-10 for "Apple" Productive Partne ply Chains and SMEs tions nvelope rship : Golden Delicious (M9 r ootstock) IDA-REDP-PP-GOODS-RFQ-20 23-1/8 / Apple tree seedlings Strengthening Agri-Food Sup Request for Quota Single Stage - One E for "Apple" Productive Partn IDA / 65580 Post Open - National 0.00 Canceled 2023-02-06 2023-03-01 2023-03-10 ply Chains and SMEs tions nvelope ership for LLC "Agrocomplex ": Red Chif (M9 rootstock) IDA-REDP-GOODS-RFB-2022- Catalyzing Investments for T Open - Internationa Single Stage - One E Pending Impl 17 / Goods for Branding,mark IDA / 65580 ourism and Urban Developm Post Request for Bids 0.00 2022-01-23 2022-01-28 2022-03-11 2022-04-10 2022-05-15 2022-11-11 l nvelope ementation eting and promotion activitie ent s for Osh region IDA-REDP-GOODS-RFQ-2021 -3 / Printing of materials for d evelopment of information m Improving Regional Economi arket system and for MinAgri, Request for Quota Single Stage - One E Pending Impl IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2022-07-22 2022-08-30 2022-11-28 Osh obl administration and 7 tions nvelope ementation unctions laborotories, market fairs, 6 border control points, soil agr ochemical map and its e-cad astre and 7 centers IDA-REDP-GOODS-RFB-2021- 2 / Laboratory equipment (for 7 sampling points for laborat ory testing, for 7 border cont Improving Regional Economi Open - Internationa Single Stage - Two E Pending Impl rol points, for 2 phytosanitar IDA / 65580 c Planning and Regulatory F Prior Request for Bids 0.00 2021-12-12 2021-12-17 2022-01-28 2022-04-12 2022-05-17 2022-11-13 l nvelope ementation y laboratories under GosStan unctions dard, food kaboratory (Sanep idnadzor), Venerinary Service and CoCommerse and small f ood laboratories etc... IDA-REDP-GOODS-RFB-2023- 10 / Laboratory equipment fo r laboratories of veterinary di Improving Regional Economi Single Stage - One E Pending Impl agnostics and examination, d IDA / 65580 c Planning and Regulatory F Post Request for Bids Open - National 0.00 2023-04-28 2023-05-03 2023-06-14 2023-07-14 2023-08-18 2024-02-14 nvelope ementation isease prevention and state s unctions anitary and epidemiological s upervision, standardization a nd metrology IDA-REDP-GOODS-RFB-2022- 8 / Office equipment, furnitur e for laboratory (ISTA) for on Improving Regional Economi testing points of expertise of Open - Internationa Single Stage - One E Pending Impl IDA / 65580 c Planning and Regulatory F Post Request for Bids 0.00 2022-02-23 2022-02-28 2022-04-11 2022-05-11 2022-06-15 2022-12-12 crops; Office equipment, furn l nvelope ementation unctions iture for 7 sampling points fo r laboratory testing; Office eq uipment, furniture for 7 bord er control points and etc. IDA-REDP-GOODS-RFQ-2023 -9 / Household equipment an d diesel generator for laborat Improving Regional Economi Request for Quota Single Stage - One E Pending Impl ories of veterinary diagnostic IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2023-05-03 2023-06-28 2023-12-25 tions nvelope ementation s and examination, disease p unctions revention and state sanitary and epidemiological supervis ion, standardization and metr ology Page 3 IDA-REDP-GOODS-RFQ-2023 -7 / Office equipment for labo ratories of veterinary diagnos Implementation Support and Request for Quota Single Stage - One E Pending Impl tics and examination, diseas IDA / 65580 Post Open - National 0.00 2023-05-16 2023-07-11 2024-01-07 Monitoring and Evaluation tions nvelope ementation e prevention and state sanita ry and epidemiological super vision, standardization and m etrology IDA-REDP-GOODS-RFQ-2023 -8 / Office furniture for labora tories of veterinary diagnosti Improving Regional Economi Request for Quota Single Stage - One E Pending Impl cs and examination, disease IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2023-05-16 2023-07-11 2024-01-07 tions nvelope ementation prevention and state sanitary unctions and epidemiological supervis ion, standardization and metr ology IDA-REDP-GOODS-RFB-2023- Strengthening Agri-Food Sup Single Stage - Two E Pending Impl 11 / Purchasing of cattle for v IDA / 65580 Post Request for Bids Open - National 0.00 2023-05-11 2023-05-16 2023-06-27 2023-09-09 2023-10-14 2024-04-11 ply Chains and SMEs nvelope ementation alue chain "Milk" IDA-REDP-PP-GOODS-RFQ-20 23-2/2 / Apple tree seedlings for "Acoustic fruit and vegeta ble freezing" Product Partner Strengthening Agri-Food Sup Request for Quota Single Stage - One E IDA / 65580 Post Open - National 0.00 Canceled 2023-01-27 2023-02-23 2023-03-10 ship:Golden Delicious (MM10 ply Chains and SMEs tions nvelope 6 rootstock), Gala (MM106 r ootstock), Red Chif (MM106 r ootstock), Super Chif (M9 ro otstock) Fudji IDA-REDP-AFSC-GOODS-RFQ Strengthening Agri-Food Sup Request for Quota Single Stage - One E -2023-4 / Fertilizer for Value IDA / 65580 Post Open - National 0.00 Canceled 2023-06-05 2023-07-31 2024-01-27 ply Chains and SMEs tions nvelope Chain "Apple" IDA-REDP-AFSC-GOODS-RFQ Strengthening Agri-Food Sup Request for Quota Single Stage - One E -2023-5 / Seeds for Value Ch IDA / 65580 Post Open - National 0.00 Canceled 2023-06-05 2023-07-31 2024-01-27 ply Chains and SMEs tions nvelope ai "Vegetables and Fruits" IDA-REDP-AFSC-GOODS-RFQ Strengthening Agri-Food Sup Request for Quota Single Stage - One E -2023-6 / Equipment for Valu IDA / 65580 Post Open - National 0.00 Canceled 2023-06-05 2023-07-31 2024-01-27 ply Chains and SMEs tions nvelope e Chai"Vegetables and Fruits " IDA-REDP-AFSC-GOODS-RFQ Strengthening Agri-Food Sup Request for Quota Single Stage - One E -2023-7 / Drip irrigation syste IDA / 65580 Post Open - National 0.00 Canceled 2023-06-05 2023-07-31 2024-01-27 ply Chains and SMEs tions nvelope m for Value Chain "Vegetable s and Fruits" IDA-REDP-AFSC-GOODS-RFQ Strengthening Agri-Food Sup Request for Quota Single Stage - One E -2023-8 / reservoir for Value IDA / 65580 Post Open - National 0.00 Canceled 2023-06-05 2023-07-31 2024-01-27 ply Chains and SMEs tions nvelope Chain "Vegetables and Fruits " IDA-REDP-AFSC-GOODS-RFQ Strengthening Agri-Food Sup Request for Quota Single Stage - One E -2023-9 / pumps for Value Ch IDA / 65580 Post Open - National 0.00 Canceled 2023-06-05 2023-07-31 2024-01-27 ply Chains and SMEs tions nvelope ain "Vegetables and Fruits" IDA-REDP-GOODS-RFQ-2023 Strengthening Agri-Food Sup Request for Quota Single Stage - One E -10 / Purchasing of equipmen IDA / 65580 Post Open - National 0.00 Canceled 2023-05-03 2023-06-28 2023-08-27 ply Chains and SMEs tions nvelope t for value chain "Milk" IDA-REDP-GOODS-RFB-2023- 12 / Purchasing of equipment Strengthening Agri-Food Sup Single Stage - One E IDA / 65580 Post Request for Bids Open - National 0.00 Canceled 2023-04-28 2023-04-28 2023-05-03 2023-06-14 2023-05-26 2023-07-14 2023-08-18 2023-08-19 for the leader of value chain ply Chains and SMEs nvelope "Milk" for "Alaiku Organics" L td. IDA-REDP-GOODS-RFQ-2023 Strengthening Agri-Food Sup Request for Quota Single Stage - One E Pending Impl -10/RT1 / Purchasing of equip IDA / 65580 Post Open - National 0.00 2023-06-21 2023-08-16 2024-02-12 ply Chains and SMEs tions nvelope ementation ment for value chain "Milk" IDA-REDP-GOODS-RFB-2023- 12/RT1 / Purchasing of equip Strengthening Agri-Food Sup Single Stage - Two E Pending Impl IDA / 65580 Post Request for Bids Open - National 0.00 2023-06-30 2023-07-05 2023-08-16 2023-10-29 2023-12-03 2024-05-31 ment for the leader of value- ply Chains and SMEs nvelope ementation chain "Milk" for "Alaikum Org anics" Ltd. IDA-REDP-RFQ-GOODS-VC-V F/A-2023-1 / Procurement of Strengthening Agri-Food Sup Request for Quota Single Stage - One E Pending Impl goods for the beneficiaries of IDA / 65580 Post Open - National 0.00 2023-07-05 2023-08-30 2024-02-26 ply Chains and SMEs tions nvelope ementation the Apple VC and for LLC Tur an Group Leader Vegetables and Fruits (2 Lots) IDA-REDP-RFB-GOODS-VC-A- Strengthening Agri-Food Sup Single Stage - Two E Pending Impl 2023-2 / Supply of plastic co IDA / 65580 Post Request for Bids Open - National 0.00 2023-06-30 2023-07-05 2023-08-16 2023-10-29 2023-12-03 2024-05-31 ply Chains and SMEs nvelope ementation ntainers for Leader of VC App le IDA-REDP-RFQ-GOODS-VC-V F-2023-3 / Supply of cargo el Strengthening Agri-Food Sup Request for Quota Single Stage - One E Pending Impl IDA / 65580 Post Open - National 0.00 2023-07-05 2023-08-30 2024-02-26 evator of LLC Turan Group fo ply Chains and SMEs tions nvelope ementation r Leader of VC Vegetables an d Fruits IDA-REDP-RFB-GOODS-VC-V F-2023-3 / Supply of equipme Strengthening Agri-Food Sup Single Stage - Two E Pending Impl IDA / 65580 Post Request for Bids Open - National 0.00 2023-06-30 2023-07-05 2023-08-16 2023-10-29 2023-12-03 2024-05-31 nt for LLC Turan Group of Lea ply Chains and SMEs nvelope ementation der of VC Vegetables and Fru its (2 Lots) IDA-REDP-RFB-GOODS-VC-V F/A-2023-4 / Supply of metal Strengthening Agri-Food Sup Request for Quota Single Stage - One E Pending Impl ware and reinforced concrete IDA / 65580 Post Open - National 0.00 2023-07-05 2023-08-30 2024-02-26 ply Chains and SMEs tions nvelope ementation poles for beneficiaries for VC Vegetables and Fruits and Ap ple (2 Lots) IDA-REDP-RFB-GOODS-VC-F V/A-2023-5 / Supply of drip ir Strengthening Agri-Food Sup Single Stage - Two E Pending Impl IDA / 65580 Post Request for Bids Open - National 0.00 2023-06-30 2023-07-05 2023-08-16 2023-10-29 2023-12-03 2024-05-31 rigation systems for benefici ply Chains and SMEs nvelope ementation aries for VC Apple and Veget ables and Fruits (5 Lots) IDA-REDP-RFQ-GOODS- VC-V F/A-2023-6 / Supply of fertiliz Strengthening Agri-Food Sup Request for Quota Single Stage - One E Pending Impl IDA / 65580 Post Open - National 0.00 2023-07-05 2023-08-30 2024-02-26 ers and seeds for beneficiarie ply Chains and SMEs tions nvelope ementation s for VC Apple and Vegetable s and Fruits (2 Lots) IDA-REDP-RFB-GOODS-VC-V F/A-2023-7 / Supply of equip Strengthening Agri-Food Sup Single Stage - Two E Pending Impl IDA / 65580 Post Request for Bids Open - National 0.00 2023-06-30 2023-07-05 2023-08-16 2023-10-29 2023-12-03 2024-05-31 ment for beneficiaries for VC ply Chains and SMEs nvelope ementation Apple and Vegetables and Fr uits (3 Lots) Page 4 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-REDP-NS-2022-5 / Acco mmodation for participants Catalyzing Investments for T Request for Quota Single Stage - One E Pending Impl of International scientific and IDA / 65580 ourism and Urban Developm Post Open - National 0.00 2022-10-08 2022-12-03 2023-06-01 tions nvelope ementation practical conference on Geot ent ourism and prospects of the geopark in the Osh region CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-REDP-CS-CQS-2021-1 / R Improving Regional Economi Consultant Qualifi Pending Impleme egional development platfor IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2021-01-25 2021-01-31 2021-03-16 2021-04-15 2021-05-20 2021-08-18 cation Selection ntation m implementation unctions IDA-REDP-CS-CQS-2021-5 / S urvey on agribusiness value Strengthening Agri-Food Sup Consultant Qualifi IDA / 65580 Post Open - National 52,594.80 Signed 2021-06-29 2021-05-06 2021-06-30 2021-05-18 2021-07-18 2022-04-12 2021-08-17 2022-04-12 2021-10-15 2022-04-14 2022-01-13 chain. Survey on diagnostic s ply Chains and SMEs cation Selection tudies. Consulting company for survey IDA-REDP-CS-LCS-2021-1 / P Implementation Support and Least Cost Selecti Open - Internationa IDA / 65580 Post 0.00 Canceled 2021-10-15 2021-11-05 2021-12-19 2022-01-16 2022-02-15 2022-03-22 2022-04-26 2026-08-23 roject audit (financial audit) Monitoring and Evaluation on l IDA-REDP-CS-QCBS-2021-10 / Сonsulting company for M& E to conduct a baseline surve Implementation Support and Quality And Cost- Open - Internationa Pending Impleme y, focus group interviews, etc IDA / 65580 Prior 0.00 2022-10-10 2022-10-31 2022-12-14 2023-01-11 2023-02-10 2023-03-17 2023-04-21 2024-04-20 Monitoring and Evaluation Based Selection l ntation . collect quantitive and qualit ative data through the projec t and then at closing provide the summary with the impact results IDA-REDP-CS-QCBS-2021-4 / Consulting company for feasi Improving Regional Economi bilty studies for SPS investm Quality And Cost- Open - Internationa IDA / 65580 c Planning and Regulatory F Post 158,295.00 Signed 2021-07-17 2021-05-01 2021-08-07 2021-05-18 2021-09-20 2021-08-25 2021-10-18 2021-09-23 2021-11-17 2022-02-08 2021-12-22 2022-02-24 2022-01-26 2022-04-01 2022-07-25 ents and design of technical Based Selection l unctions specifications for equipment of laboratories, centers and p oints IDA-REDP-CS-CQS-2021-25 / Catalyzing Investments for T Consultant Qualifi Regional Tourism Strategy C IDA / 65580 ourism and Urban Developm Post Open - National 90,744.99 Signed 2021-10-27 2021-09-22 2021-11-17 2021-12-31 2022-05-11 2022-01-30 2022-05-11 2022-03-06 2022-05-12 2022-09-02 cation Selection onsultant for Osh Oblast ent IDA-REDP-CS-QCBS-2021-11 / Consulting company to iden Strengthening Agri-Food Sup Quality And Cost- Open - Internationa tify specific supply chain acto IDA / 65580 Post 0.00 Canceled 2021-07-23 2021-07-28 2021-09-01 2021-10-03 2021-10-23 2021-11-13 2021-12-10 2022-04-09 ply Chains and SMEs Based Selection l rs for participation and the c ompetitive selection of sub-p rojects IDA-REDP-CS-QCBS-2021-1 / Training in hospitality industr Catalyzing Investments for T Quality And Cost- Open - Internationa y for tour guides, tour operat IDA / 65580 ourism and Urban Developm Prior 0.00 Canceled 2021-08-25 2021-09-15 2021-10-29 2021-11-26 2021-12-26 2022-01-30 2022-03-06 2023-03-06 Based Selection l ors and accomodation mana ent gers/staff; Technical support in business planning IDA-REDP-CS-CQS-2021-27 / Consulting company providin Strengthening Agri-Food Sup Consultant Qualifi Pending Impleme g training and advice to mem IDA / 65580 Post Open - National 0.00 2022-04-04 2022-04-25 2022-06-08 2022-07-08 2022-08-12 2023-02-08 ply Chains and SMEs cation Selection ntation bers of productive partnershi ps for productivity, quality, m arketing and sales ARIS-AUDIT-LCS-2021-1 / Au Implementation Support and Least Cost Selecti Open - Internationa Under Implement IDA / 65580 Post 0.00 2021-09-01 2021-09-13 2021-09-15 2021-09-24 2021-10-13 2021-10-20 2021-10-27 2021-11-10 2021-12-08 2024-12-07 dit (financial audit) Monitoring and Evaluation on l ation IDA-REDP-CS-QCBS-2021-5 / Implementation Support and Quality And Cost- Open - Internationa Company for Preparation of f IDA / 65580 Prior 0.00 Canceled 2021-05-20 2021-06-10 2021-07-24 2021-08-21 2021-09-20 2021-10-25 2021-11-29 2022-11-29 Monitoring and Evaluation Based Selection l uture projects IDA-REDP-CS-CQS-2021-20 / Conducting an information ca mpaign, social mobilization a Strengthening Agri-Food Sup Consultant Qualifi nd diagnostic study in order t IDA / 65580 Post Open - National 0.00 Canceled 2021-09-20 2021-09-16 2021-10-11 2021-11-24 2021-12-24 2022-01-28 2022-07-27 ply Chains and SMEs cation Selection o build value chains and crea te productive partnerships in Osh oblast and Osh city and t heir further development IDA-REDP-CS-CQS-2021-22 / Conducting an information ca mpaign, social mobilization a Strengthening Agri-Food Sup Consultant Qualifi nd diagnostic study in order t IDA / 65580 Post Open - National 288,773.33 Signed 2021-12-20 2021-10-29 2022-01-10 2022-02-23 2022-04-19 2022-03-25 2022-04-19 2022-04-29 2022-04-20 2024-04-18 ply Chains and SMEs cation Selection o build value chains and crea te productive partnerships in Osh oblast and Osh city and t heir further development IDA-REDP-CS-QCBS-2021-3 / Support to department of To Improving Regional Economi Quality And Cost- Open - Internationa urism and regional/local touri IDA / 65580 c Planning and Regulatory F Prior 0.00 Canceled 2021-06-20 2021-07-11 2021-08-24 2021-09-21 2021-10-21 2021-11-25 2021-12-30 2022-05-29 Based Selection l sm agencies for improved st unctions atistics and data collection IDA-REDP-CS-CQS-2021-21 / Training in hospitality industr Supporting Tourism and Rur Consultant Qualifi y for tour guides, tour operat IDA / 65580 al Development through Sm Post Open - National 0.00 Canceled 2021-09-27 2021-10-18 2021-12-01 2021-12-31 2022-02-04 2022-08-03 cation Selection ors and accomodation mana all Grants gers/staff; Technical support in business planning IDA-REDP-CS-QCBS-2021-2 / Comprehensive assessment Catalyzing Investments for T of SulaimanToo and Uzgen m Quality And Cost- Open - Internationa IDA / 65580 ourism and Urban Developm Post 0.00 Canceled 2021-08-25 2021-10-22 2021-09-15 2021-10-29 2021-11-26 2021-12-26 2022-01-30 2022-03-06 2023-08-28 useums complexes Detailed Based Selection l ent designs and Construction Su pervision for SulaimanToo an d the Uzgen Museum IDA-REDP-CS-CQS-2021-3 / Improving Regional Economi Consultant Qualifi Open - Internationa Development of Visitors Man IDA / 65580 c Planning and Regulatory F Post 0.00 Canceled 2021-06-29 2021-07-20 2021-09-02 2021-10-02 2021-11-06 2022-02-04 cation Selection l agement Plans for Suleiman unctions Too and Uzgen Page 5 IDA-REDP-CS-CQS-2021-2 / Improving Regional Economi Development of Visitors Man Consultant Qualifi IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 Canceled 2021-06-17 2021-06-23 2021-08-06 2021-09-05 2021-10-10 2022-01-08 agement Plans for Kyrgyz-At cation Selection unctions a, Abshyr-Ata, Karashoroo IDA-REDP-CS-CQS-2021-24 / Consulting company for the p reparation of the regional ec onomic development progra Strengthening Agri-Food Sup Consultant Qualifi IDA / 65580 Post Open - National 0.00 Canceled 2021-09-26 2021-10-22 2021-10-17 2021-11-30 2021-12-30 2022-02-03 2022-08-02 m of osh oblast and economi ply Chains and SMEs cation Selection c development program of os h city under the implementat ion of the regional economic development project IDA-REDP-CS-CQS-2021-7 / Desing for tourism site touri Catalyzing Investments for T Consultant Qualifi sm services and amenities (e IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Canceled 2021-06-29 2021-10-22 2021-07-06 2021-08-19 2021-09-30 2021-10-12 2022-07-14 cation Selection g Desing Abshir-Ata: Kara-Sh ent oro Park Kyrgyz-Ata: infrastr ucture improvement) IDA-REDP-CS-QCBS-2021-15 / Support to department of T Catalyzing Investments for T Quality And Cost- Open - Internationa Pending Impleme ourism and regional/local tou IDA / 65580 ourism and Urban Developm Post 0.00 2022-01-11 2022-02-01 2022-03-17 2022-04-14 2022-05-14 2022-06-18 2022-07-23 2023-07-23 Based Selection l ntation rism agencies for improved s ent tatistics and data collection IDA-REDP-CS-CQS-2021-9 / T Catalyzing Investments for T Consultant Qualifi Open - Internationa IDA / 65580 Post 0.00 Canceled 2021-06-29 2021-07-20 2021-09-02 2021-10-02 2021-11-06 2022-03-06 echnical audit ourism and Urban Developm cation Selection l ent IDA-REDP-CS-QCBS-2021-6 / Catalyzing Investments for T Quality And Cost- Open - Internationa Osh City Construction Superv IDA / 65580 ourism and Urban Developm Post 0.00 Canceled 2021-07-23 2021-08-13 2021-09-05 2021-10-03 2021-10-23 2021-11-13 2021-12-10 2023-12-30 Based Selection l ision Services ent IDA-REDP-CS-CQS-2021-6 / P Catalyzing Investments for T reparation of detailed design Consultant Qualifi IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Canceled 2021-06-29 2021-07-04 2021-08-17 2021-09-28 2021-10-10 2022-01-13 packages for Osh and Uzgen cation Selection ent Design packages IDA-REDP-CS-CQS-2021-8 / T echnical supervision for touri Catalyzing Investments for T Consultant Qualifi sm sites (infrastructure impr IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Canceled 2021-06-29 2021-07-06 2021-08-19 2021-09-30 2021-10-17 2022-04-15 cation Selection ovement: Abshir-Ata, park Ka ent ra-Shoro, Kyrgyz-Ata) IDA-REDP-CS-CQS-2021-13 / Catalyzing Investments for T DED: Zones between residen Consultant Qualifi Pending Impleme IDA / 65580 ourism and Urban Developm Post Open - National 0.00 2021-11-21 2021-12-12 2022-01-25 2022-02-24 2022-03-31 2022-09-27 tial quarters/blocks, wall pain cation Selection ntation ent ting (mosaic), the northern p art of Lenin Street. IDA-REDP-CS-QCBS-2021-14 / DED: Development of feasib Catalyzing Investments for T Quality And Cost- Open - Internationa Under Implement ility study and DED of infrastr IDA / 65580 ourism and Urban Developm Post 0.00 2021-11-30 2022-07-12 2021-12-05 2022-07-29 2021-12-15 2021-12-30 2022-01-09 2022-01-29 2022-02-25 2023-02-25 Based Selection l ation ucture of Sulaiman-Too comp ent lex and Uzgen historical and architectural complex IDA-REDP-CS-CQS-2021-28 / Consulting company for prep Improving Regional Economi Consultant Qualifi aration of a regional economi IDA / 65580 c Planning and Regulatory F Post Open - National 148,095.79 Signed 2021-11-26 2021-12-02 2021-12-06 2021-12-26 2022-05-11 2021-12-31 2022-05-11 2022-01-26 2022-05-12 2022-07-25 cation Selection c development program for t unctions he Osh oblast and Osh city IDA-REDP-CS-CQS-2021-11 / Catalyzing Investments for T Detailed design packages an Consultant Qualifi IDA / 65580 ourism and Urban Developm Post Open - National 49,479.16 Signed 2021-11-30 2022-03-04 2021-12-21 2022-02-03 2022-04-12 2022-03-05 2022-06-01 2022-04-29 2022-06-08 2022-07-28 d author supervision for the s cation Selection ent elected facilities in the city of Osh IDA-REDP-CS-CQS-2021-15 / Detailed design packages for Catalyzing Investments for T : City Park of Culture and Lei Consultant Qualifi IDA / 65580 ourism and Urban Developm Post Open - National 50,868.60 Signed 2021-11-21 2022-03-02 2021-12-12 2022-01-25 2022-04-05 2022-02-24 2022-06-01 2022-03-31 2022-06-08 2022-09-27 sure "Tynchtyk" named after cation Selection ent N. Aznabakieva, park near th e city stadium, city stadium a nd park bridge IDA-REDP-CS-CQS-2021-17 / Design services and author s Catalyzing Investments for T Consultant Qualifi upervision for Kara-Shoro an IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Canceled 2021-11-28 2022-03-18 2021-12-19 2022-03-29 2022-02-01 2022-07-22 2022-03-03 2022-08-22 2022-04-07 2022-10-04 cation Selection d Kyrgyz-Ata national parks a ent nd Abshir-Ata Waterfall IDA-REDP-CS-CQS-2021-12 / Catalyzing Investments for T Consultant Qualifi IDA / 65580 Post Open - National 0.00 Canceled 2021-11-21 2021-12-12 2022-01-25 2022-02-24 2022-03-31 2022-09-27 DED: coastal zone of the Ak- ourism and Urban Developm cation Selection Buura river ent IDA-REDP-CS-QCBS-2021-13 Supporting Tourism and Rur / Consulting company for the Quality And Cost- Open - Internationa IDA / 65580 al Development through Sm Post 0.00 Signed 2022-05-08 2022-05-11 2022-05-18 2022-06-07 2022-07-22 2022-06-17 2022-08-23 2022-06-27 2022-09-13 2022-07-17 2022-09-27 2022-08-11 2025-02-18 preparation and implementat Based Selection l all Grants ion of the Small Grants Progr am IDA-REDP-CS-CQS-2021-31 / Selection of consulting comp any for assessment of the sol Implementation Support and Consultant Qualifi IDA / 65580 Post Open - National 0.00 Canceled 2022-03-01 2022-03-04 2022-03-22 2022-05-05 2022-06-04 2022-07-09 2023-01-05 id waste management syste Monitoring and Evaluation cation Selection ms in selected towns and the identification of priority secto r investments IDA-REDP-CS-CQS-2021-31- RT / Selection of consulting c ompany for assessment of th Implementation Support and Consultant Qualifi Open - Internationa IDA / 65580 Post 35,578.71 Signed 2022-06-17 2022-06-17 2022-07-08 2022-08-21 2022-07-07 2022-09-20 2022-08-02 2022-10-25 2022-08-09 2023-04-23 e solid waste management s Monitoring and Evaluation cation Selection l ystems in selected towns an d the identification of priority sector investments IDA-REDP-CS-CQS-2021-23 / Consulting Services for the pr eparation of a Tourism Mana gement Plan for Catalyzing Investments for T Consultant Qualifi Open - Internationa the Sulaiman-Too and Uzgen IDA / 65580 ourism and Urban Developm Post 0.00 Signed 2022-07-25 2022-07-27 2022-08-15 2022-08-01 2022-09-18 2022-10-20 2022-10-18 2022-12-16 2022-11-15 2023-09-08 cation Selection l Historical and Architectural C ent omplexes; Interior Design an d Exhibition Plan for the Sulai man-Too Cave Museum; and Recommendation for enlistin g Uzgen Histo IDA-REDP-CS-QCBS-2021-12 Implementation Support and Quality And Cost- Open - Internationa Pending Impleme / Company for Preparation of IDA / 65580 Prior 0.00 2024-02-05 2024-02-26 2024-04-10 2024-05-08 2024-06-07 2024-07-12 2024-08-16 2025-02-12 Monitoring and Evaluation Based Selection l ntation future projects Page 6 IDA-REDP-CS-QCBS-2021-7 / Catalyzing Investments for T Quality And Cost- Open - Internationa Tech supervision SulaimanT IDA / 65580 ourism and Urban Developm Post 0.00 Canceled 2021-07-23 2022-08-05 2021-08-07 2021-09-05 2021-10-03 2021-10-23 2021-11-13 2021-12-10 2023-12-30 Based Selection l oo and the Uzgen Museum ent IDA-REDP-CS-QCBS-2021-7. / Technical Supervision of Civil Catalyzing Investments for T Quality And Cost- Open - Internationa Works at the Sulaiman-Too a IDA / 65580 ourism and Urban Developm Post 0.00 Canceled 2022-08-22 2022-08-24 2022-09-12 2022-08-29 2022-10-26 2023-04-01 2022-11-23 2023-04-01 2022-12-23 2023-04-01 2023-01-27 2023-04-01 2023-03-03 2024-03-02 Based Selection l nd Uzgen Historical and Archi ent tectural Complexes IDA-REDP-CS-CQS-2021-14 / Catalyzing Investments for T Consultant Qualifi Pending Impleme DED: road networks (5 street IDA / 65580 ourism and Urban Developm Post Open - National 0.00 2021-11-21 2021-12-12 2022-01-25 2022-02-24 2022-03-31 2022-09-27 cation Selection ntation s) and extension of Dostuk p ent ark IDA-REDP-CS-CQS-2021-19 / Preparation of Design Estima te Documentation (DED) pac Catalyzing Investments for T kages for the construction of Consultant Qualifi IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Signed 2022-10-10 2022-10-13 2022-10-31 2022-10-28 2022-12-14 2023-03-07 2023-01-13 2023-03-07 2023-02-17 2023-08-16 an access road, installation o cation Selection ent f transformer substation, pow er transmission line within Pu blic-Private Cooperation Prog ram of RED-1 IDA-REDP-CS-CQS-2021-18 / Catalyzing Investments for T Consultant Qualifi Technical Supervision of Civil IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Canceled 2022-06-20 2022-06-13 2022-07-11 2022-07-21 2022-08-24 2022-09-23 2022-11-07 2024-07-05 cation Selection Works under the RED-1 ent IDA-REDP-CS-CQS-2021-26 / Consulting Services for the pr Catalyzing Investments for T Consultant Qualifi Under Implement eparation of Management Pla IDA / 65580 ourism and Urban Developm Post Open - National 0.00 2021-12-01 2022-10-05 2021-12-11 2022-10-11 2021-12-28 2022-01-07 2022-02-10 2022-08-09 cation Selection ation ns for the State Nature Parks ent Kara-Shoro, Kyrgyz-Ata and waterfall Abshir-Ata IDA-REDP-CS-CQS-2021-18- Catalyzing Investments for T Consultant Qualifi Under Implement RT / Technical Supervision of IDA / 65580 ourism and Urban Developm Post Open - National 0.00 2022-10-03 2022-10-04 2022-10-24 2022-10-06 2022-12-07 2023-01-12 2023-01-06 2023-02-15 2023-02-10 2026-05-25 cation Selection ation Civil Works under the RED-1 ent IDA-REDP-CS-QCBS-2021-8 / Catalyzing Investments for T Company for Branding,marke Quality And Cost- Open - Internationa Pending Impleme IDA / 65580 ourism and Urban Developm Post 0.00 2023-07-23 2023-07-28 2023-09-13 2023-10-03 2023-10-23 2023-11-13 2023-12-10 2024-08-04 ting and promotion activities Based Selection l ntation ent for Osh region IDA-REDP-CS-CQS-2022-28 / Selection of a consulting com pany for the provision of trai Strengthening Agri-Food Sup Consultant Qualifi Under Implement IDA / 65580 Post Open - National 0.00 2022-11-17 2023-05-23 2022-12-08 2023-05-26 2023-01-21 2023-02-20 2023-03-27 2023-09-23 ning consultancy service to t ply Chains and SMEs cation Selection ation he participants of the Produc tive Partnership of Osh Oblas t and Osh City IDA-REDP-CS-CQS-2021-17- RT / Consulting Company for Catalyzing Investments for T Feasibility Studies, Design Se Consultant Qualifi Under Implement IDA / 65580 ourism and Urban Developm Post Open - National 0.00 2023-03-03 2023-03-24 2023-03-24 2023-04-08 2023-05-07 2023-06-06 2023-07-11 2024-03-07 rvices and Author Supervisio cation Selection ation ent n for Kara-Shoro and Kyrgyz- Ata National Parks and Abshi r-Ata Waterfall IDA-REDP-CS-CQS-2021-4 / Consulting company to cond Strengthening Agri-Food Sup Consultant Qualifi Pending Impleme IDA / 65580 Post Open - National 0.00 2021-06-29 2021-07-04 2021-08-17 2021-09-28 2021-10-15 2023-10-05 uct market studies. Methodol ply Chains and SMEs cation Selection ntation ogy for National Stakeholders Platform IDA-REDP-CS-CQS-2023-1 / Improving Regional Economi Consulting company for the d Consultant Qualifi Under Implement IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2023-03-24 2023-03-31 2023-04-14 2023-04-08 2023-05-28 2023-06-27 2023-08-01 2024-01-28 evelopment of detailed desig cation Selection ation unctions n for facilities in Osh region a nd Osh city IDA-REDP-CS-CQS-2021-10 / Consulting company for Deve lopment of design document ation and supervision of repa Improving Regional Economi Consultant Qualifi Pending Impleme ir of the office of Osh technic IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2021-12-20 2021-12-25 2022-02-07 2022-03-21 2022-04-02 2022-10-18 cation Selection ntation al agriculture college, (includi unctions ng driving fields) and office o f Osh technological university , warehouses of seed farms a nd plemzavod etc... IDA-REDP-CS-QCBS-2021-7- RT / Technical Supervision of Catalyzing Investments for T Quality And Cost- Open - Internationa Under Implement Civil Works at the Sulaiman-T IDA / 65580 ourism and Urban Developm Post 0.00 2023-04-14 2023-04-10 2023-05-05 2023-04-28 2023-06-18 2023-07-16 2023-08-15 2023-09-19 2023-10-24 2024-10-18 Based Selection l ation oo and Uzgen Historical and ent Architectural Complexes IDA-REDP-CS-CQS-2023-33 / For Consultancy Services to Catalyzing Investments for T Consultant Qualifi Under Implement deliver a Capacity Building Pr IDA / 65580 ourism and Urban Developm Post Open - National 0.00 2023-04-28 2023-05-02 2023-05-19 2023-05-13 2023-07-02 2023-08-01 2023-09-05 2024-03-03 cation Selection ation ogram for the Tourism Sector ent Stakeholders in the Osh Regi on IDA-REDP-CS-CQS-2023-34 / Tourism Product developmen Catalyzing Investments for T Consultant Qualifi Pending Impleme t at the regional level (fairs, IDA / 65580 ourism and Urban Developm Post Open - National 0.00 2023-05-29 2023-06-19 2023-08-02 2023-09-01 2023-10-06 2024-04-03 cation Selection ntation exhibitions, PR, media campa ent igns, cultural events, forums) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-REDP-CS-IC-2021-11 / Lo Improving Regional Economi Individual Consult Pending Impleme cal consultant for review of le IDA / 65580 c Planning and Regulatory F Post Open 0.00 2021-12-21 2022-01-23 2022-02-25 2022-03-22 2023-03-17 ant Selection ntation gal acts for exports 3 unctions IDA-REDP-CS-IC-2021-12 / Lo Improving Regional Economi Individual Consult Pending Impleme cal consultant for review of le IDA / 65580 c Planning and Regulatory F Post Open 0.00 2021-12-21 2022-01-23 2022-01-25 2022-03-26 2023-03-21 ant Selection ntation gal acts for exports 4 unctions IDA-REDP-CS-IC-2021-13 / C Improving Regional Economi onsultant for Development of Individual Consult Pending Impleme IDA / 65580 c Planning and Regulatory F Post Open 0.00 2021-12-21 2022-01-23 2022-01-25 2022-03-26 2023-03-21 legal documents of 7 samplin ant Selection ntation unctions g points for laboratory testin g Page 7 IDA-REDP-CS-IC-2021-4 / Co Improving Regional Economi nsultant for Development of Individual Consult Pending Impleme IDA / 65580 c Planning and Regulatory F Post Open 0.00 2020-11-25 2020-12-25 2020-12-30 2021-02-28 2022-02-23 education materials for Osh t ant Selection ntation unctions echnical agricultural college and Osh university IDA-REDP-CS-IC-2021-8 / Int Improving Regional Economi Individual Consult Pending Impleme ernational consultant for revi IDA / 65580 c Planning and Regulatory F Post Open 0.00 2020-12-21 2021-01-20 2021-01-25 2021-03-26 2022-03-21 ant Selection ntation ew of legal acts for exports unctions IDA-REDP-CS-IC-2021-10 / Lo Improving Regional Economi Individual Consult Pending Impleme cal consultant for review of le IDA / 65580 c Planning and Regulatory F Post Open 0.00 2020-12-21 2021-01-20 2021-01-25 2021-03-26 2022-03-21 ant Selection ntation gal acts for exports 2 unctions IDA-REDP-CS-IC-2021-9 / Loc Improving Regional Economi Individual Consult Pending Impleme al consultant for review of le IDA / 65580 c Planning and Regulatory F Post Open 0.00 2020-12-21 2021-01-20 2021-01-25 2021-03-26 2021-05-01 ant Selection ntation gal acts for exports 1 unctions IDA-REDP-CS-IC-2021-20 / C Supporting Tourism and Rur onsultant to provide support Individual Consult IDA / 65580 al Development through Sm Post Open 16,421.51 Signed 2021-10-21 2021-08-19 2021-12-09 2022-04-15 2021-12-30 2022-04-15 2022-02-03 2022-04-16 2022-08-02 to ARIS with Small Grants Pro ant Selection all Grants gram and Public and Private Cooperation initiative IDA-REDP-CS-IC-2021-1 / Co Improving Regional Economi Individual Consult nsultant for Regional Econom IDA / 65580 c Planning and Regulatory F Post Open 0.00 Canceled 2020-11-25 2020-12-25 2020-12-30 2021-02-28 2022-02-23 ant Selection ic Development Plan for Osh unctions region IDA-REDP-CS-IC-2021-2 / Co Improving Regional Economi Individual Consult nsultant for Development of t IDA / 65580 c Planning and Regulatory F Post Open 0.00 Canceled 2021-09-27 2021-05-18 2021-10-27 2021-11-01 2021-12-31 2022-12-26 ant Selection he Regional tourism strategy unctions for Osh region IDA-REDP-CS-IC-2021-21 / Fo r the Consultancy to provide Implementation Support and Individual Consult IDA / 65580 Post Open 0.00 Canceled 2021-12-12 2021-10-07 2022-01-30 2022-02-20 2022-03-27 2022-09-23 support to ARIS with Social Is Monitoring and Evaluation ant Selection sues for RED Project IDA-REDP-CS-IC-2021-22 / Fo r the Consultancy to provide Implementation Support and Individual Consult IDA / 65580 Post Limited 7,055.99 Signed 2021-12-12 2021-10-12 2021-12-26 2022-04-04 2022-02-20 2022-04-04 2022-03-27 2022-04-06 2022-09-23 support to ARIS with Social Is Monitoring and Evaluation ant Selection sues for RED Project IDA-REDP-CS-IC-2021-19 / C onsultants for the developme Strengthening Agri-Food Sup Individual Consult nt of business plans and proj IDA / 65580 Post Open 0.00 Canceled 2021-10-29 2021-12-17 2022-01-07 2022-02-11 2022-08-10 ply Chains and SMEs ant Selection ect proposals at the stages o f selection of productive part nerships IDA-REDP-CS-IC-2021-24 / C Catalyzing Investments for T onsulting for conducting rese Individual Consult Pending Impleme IDA / 65580 ourism and Urban Developm Post Open 0.00 2021-11-30 2021-12-25 2022-01-04 2022-01-20 2022-04-20 arch on tourism statistics an ant Selection ntation ent d developing recommendatio ns for impoving IDA-REDP-CS-IC-2021-6 / Loc Improving Regional Economi al consultant for for MinAgri, Individual Consult IDA / 65580 c Planning and Regulatory F Post Open 0.00 Canceled 2020-11-25 2020-12-25 2020-12-30 2021-02-28 2022-02-23 Osh oblast administration an ant Selection unctions d other stakeholders 1 IDA-REDP-CS-IC-2021-7 / Loc Improving Regional Economi al consultant for for MinAgri, Individual Consult IDA / 65580 c Planning and Regulatory F Post Open 0.00 Canceled 2020-12-21 2021-01-20 2021-01-25 2021-03-26 2022-03-21 Osh oblast administration an ant Selection unctions d other stakeholders 2 IDA-REDP-CS-IC-2021-25 / C onsultant - trainer for capacit y building of specialists of go Improving Regional Economi vernment bodies and process Individual Consult IDA / 65580 c Planning and Regulatory F Post Open 1,627.02 Signed 2021-12-05 2021-11-25 2022-01-23 2022-04-05 2022-02-13 2022-04-03 2022-03-20 2022-04-14 2022-09-16 ing enterprises on food safet ant Selection unctions y in accordance with internat ional food quality and safety standards (ISO 9001, ISO 220 00, FSSC 22000). IDA-REDP-CS-IC-2021-26 / C onsultant-trainer for capacity building of specialists of gove rnment bodies and agricultur Improving Regional Economi Individual Consult al producers on ensuring the IDA / 65580 c Planning and Regulatory F Post Open 1,627.02 Signed 2021-12-05 2021-11-25 2022-01-23 2022-04-01 2022-02-13 2022-04-01 2022-03-20 2022-04-06 2022-09-16 ant Selection safety of agricultural producti unctions on in accordance with intern ational standards (GLOBAL G .A.P., Organic, ISO 14000, etc .) for domestic mar IDA-REDP-CS-CQS-2021-30 / Implementation Support and Individual Consult Pending Impleme IDA / 65580 Post Open 0.00 2023-05-05 2023-06-23 2023-07-14 2023-08-18 2024-02-14 Technical audit Monitoring and Evaluation ant Selection ntation IDA-REDP-CS-IC-2021-31 / S Implementation Support and Individual Consult election of institutional devel IDA / 65580 Post Limited 9,490.78 Signed 2021-12-05 2021-12-08 2021-12-10 2022-04-05 2021-12-31 2022-04-05 2022-02-04 2022-04-07 2022-08-03 Monitoring and Evaluation ant Selection opment consultant IDA-REDP-CS-IC-2021-27 / In dependent consultant on eva Strengthening Agri-Food Sup Individual Consult IDA / 65580 Post Open 0.00 Canceled 2021-12-27 2022-02-14 2022-03-07 2022-04-11 2023-10-03 luation of business plans and ply Chains and SMEs ant Selection Sub-project proposals IDA-REDP-CS-IC-2021-32 / C Catalyzing Investments for T Individual Consult Under Implement onsultant to develop a websit IDA / 65580 ourism and Urban Developm Post Open 0.00 2022-04-28 2022-05-13 2022-06-16 2022-07-07 2022-08-11 2023-02-07 ant Selection ation e of the Public-Private Coope ent ration Program IDA-REDP-CS-IC-2021-14 / C onsultant-trainer on capacity building of employees of the Ministry of Agriculture of the Strengthening Agri-Food Sup Individual Consult Under Implement Kyrgyz Republic, specialists o IDA / 65580 Post Open 0.00 2022-05-25 2022-06-06 2022-07-13 2022-08-03 2022-09-07 2023-03-06 ply Chains and SMEs ant Selection ation f the Regional Economic Dev elopment Project of Osh obla st and Osh city, ARIS and the Agribusiness Competitivenes s Center on building a IDA-REDP-CS-IC-2021-5 / Int Improving Regional Economi ernational consultant for Min Individual Consult Pending Impleme IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2022-07-22 2022-09-09 2022-09-30 2022-11-04 2023-05-03 Agri, Osh oblast administrati ant Selection ntation unctions on and other stakeholders Page 8 IDA-REDP-CS-IC-2021-28 / In dependent consultant on eva Strengthening Agri-Food Sup Individual Consult Under Implement IDA / 65580 Post Open - National 0.00 2022-10-06 2022-10-04 2022-11-24 2022-11-02 2022-12-15 2022-11-02 2023-01-19 2023-07-18 luation of business plans and ply Chains and SMEs ant Selection ation Sub-project proposals IDA-REDP-CS-IC-2022-33 / C Catalyzing Investments for T Individual Consult onsultancy services of an int IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Canceled 2022-11-14 2022-10-31 2023-01-02 2023-01-23 2023-02-27 2023-08-26 ant Selection ernational expert in the field ent of museology IDA-REDP-CS-IC-2022-34 / C Catalyzing Investments for T Individual Consult onsultancy services of an int IDA / 65580 ourism and Urban Developm Post Open - National 0.00 Canceled 2022-11-14 2022-10-31 2023-01-02 2023-01-23 2023-02-27 2023-08-26 ant Selection ernational World Heritage ex ent pert IDA-REDP-CS-IC-2022-34/1 / Catalyzing Investments for T Individual Consult Open - Internationa Under Implement Consultancy services of an in IDA / 65580 ourism and Urban Developm Post 0.00 2022-11-14 2022-11-23 2023-01-02 2023-01-23 2023-02-27 2023-05-28 ant Selection l ation ternational World Heritage ex ent pert IDA-REDP-CS-IC-2021-29 / In dependent consultant on eva Strengthening Agri-Food Sup Individual Consult Under Implement IDA / 65580 Post Open - National 0.00 2023-03-24 2023-03-24 2023-05-12 2023-06-02 2023-07-07 2024-01-03 luation of business plans and ply Chains and SMEs ant Selection ation Sub-project proposals IDA-REDP-CS-IC-2023-3 / Cre Strengthening Agri-Food Sup Individual Consult Under Implement dit specialist for evaluation of IDA / 65580 Post Open - National 0.00 2023-03-24 2023-03-25 2023-05-12 2023-06-02 2023-07-07 2024-01-03 ply Chains and SMEs ant Selection ation credit documentation of VC p articipants IDA-REDP-CS-IC-2021-30 / In dependent consultant on eva Strengthening Agri-Food Sup Individual Consult Under Implement IDA / 65580 Post Open - National 0.00 2023-03-31 2023-03-24 2023-05-19 2023-06-09 2023-07-14 2024-01-10 luation of business plans and ply Chains and SMEs ant Selection ation Sub-project proposals IDA-REDP-CS-IC-2023-2 / Sh Improving Regional Economi Individual Consult Under Implement ort-term individual consultan IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2023-03-31 2023-03-25 2023-05-19 2023-06-09 2023-07-14 2024-01-10 ant Selection ation t for laboratory equipment unctions IDA-REDP-CS-IC-2021-3 / Co Improving Regional Economi Individual Consult Under Implement nsultant for sowtfare desing IDA / 65580 c Planning and Regulatory F Post Open - National 0.00 2020-11-25 2023-04-19 2020-12-25 2020-12-30 2021-02-28 2022-02-23 ant Selection ation and on-job training unctions IDA-REDP-CS-IC-2022-33/1/T R1 / Consultancy services of Strengthening Agri-Food Sup Individual Consult Pending Impleme IDA / 65580 Post Open - National 0.00 2023-06-16 2023-08-04 2023-08-25 2023-09-29 2024-03-27 an international expert in the ply Chains and SMEs ant Selection ntation field of museology IDA-REDP-CS-IC-2022-33/1 / Catalyzing Investments for T Individual Consult Open - Internationa Consultancy services of an in IDA / 65580 ourism and Urban Developm Post 0.00 Canceled 2022-11-14 2022-11-23 2023-01-02 2023-04-06 2023-01-23 2023-02-27 2023-05-28 ant Selection l ternational expert in the field ent of museology Page 9 Procurement Plan P159756 M2PATE I. General 2. Bank’s approval Date of the procurement Plan: 16 mars 2017 3. Date of General Procurement Notice: None 4. Period covered by this procurement plan: Nov 2016 à Nov 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [ not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: En cours de preparation 5. Any Other Special Procurement Arrangements: [Not applicable] 6. Summary of the Procurement Packages planned during the first 18 July 9, 2010 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary of the ICB (Works) Summary of the ICB (Goods) Summary of the NCB (Works) Summary of the NCB (Goods) Summary of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. July 9, 2010 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 1.40 4 Prior of number of contracts that will be let under QCBS Summary 0.11 4 Prior ICS of number of contracts that will be let under other methods Summary 0..30 4 Post ICS of number of contracts that will be let under other methods Summary 0.20 1 Prior SSS of number of contracts that will be let under July 9, 2010 other methods July 9, 2010 PROCUREMENT Madagascar : Integrated Urban Development and Resilience Project for Greater Antananarivo PLAN General Information Country: Madagascar 2017-03-30 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank 2023-05-22 if none) Project ID: P159756 GPN Date: Project Name: Integrated Urban Development and Resilience Project for Greater Antananarivo Loan / Credit No: IDA / V0550, / , IDA / 62450 Ministry to the Presidency for Presidential Projects, Planning and Equipment Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Comple Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes tion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MG-M2PATE-61115-CW-DIR / Project Management, Coordi Aménagement de bureaux p 2018-08-2 IDA / V0550 nation, Monitoring and Evalu Post Direct Selection Direct 20,000.00 19,977.98 Signed 2018-05-03 2018-06-28 2018-05-08 2018-07-10 2018-05-29 2018-07-31 our l'Unité de Gestion de 7 ation Projet (UGP) MG-M2PATE-103005-CW-RFB Improving urban drainage, s Open - Internationa Single Stage - One E 13,962,803.0 2021-11-1 / Travaux sur canal C3 et con IDA / 62450 ervices and resilience in targ Prior Request for Bids 0.00 Canceled 2019-02-26 2019-05-15 2019-05-24 2019-03-22 2019-07-07 2019-08-01 2019-08-12 l nvelope 0 3 fortement des digues eted areas MG-M2PATE-103530-CW-RFB Improving urban drainage, s Open - Internationa Single Stage - One E 2020-02-2 / Travaux d'aménagement du IDA / 62450 ervices and resilience in targ Post Request for Bids 2,000,000.00 0.00 Canceled 2019-03-11 2019-07-05 2019-05-29 2019-06-14 2019-04-05 2019-08-28 2019-07-28 2019-08-17 2019-08-30 l nvelope 6 site de confinement des boue eted areas s de curage MG-M2PATE-103532-CW-RFB Improving urban drainage, s Open - Internationa Single Stage - One E 2020-08-2 IDA / 62450 Post Request for Bids 2,008,486.00 0.00 Canceled 2019-03-04 2019-07-05 2019-05-15 2019-10-25 2019-07-22 2019-03-22 2019-08-28 2019-09-24 2019-10-14 2019-10-25 / Travaux de site de réinstalla ervices and resilience in targ l nvelope 0 tion C1.1 eted areas MG-M2PATE-103581-CW-RFB / Travaux de construction et Improving urban drainage, s Open - Internationa Single Stage - One E Under Imple 2021-05-0 de réhabilitation des infrastru IDA / 62450 ervices and resilience in targ Post Request for Bids 5,000,000.00 0.00 2019-04-22 2019-07-05 2019-07-05 2019-10-20 2019-05-17 2019-12-18 2020-01-02 2020-01-13 l nvelope mentation 7 ctures sanitaires et de mobili eted areas té ( travaux quick Win - trava ux facilement à exécuter) MG-M2PATE-126089-CW-RF Strenghtening institutional c Request for Quota Single Stage - One E Pending Imp 2019-11-0 Q / Travaux d'aménagement IDA / 62450 apacity for resilient urban go Post Limited 5,555.56 0.00 2019-08-17 2019-10-05 tions nvelope lementation 4 de la salle de réunion de l'UG vernance MP MG-M2PATE-154055-CW-RFB Improving urban drainage, s Open - Internationa Single Stage - One E Under Imple 2021-04-2 / Travaux sur les sites de réin IDA / 62450 ervices and resilience in targ Post Request for Bids 2,008,486.00 0.00 2020-03-24 2020-12-01 2020-04-08 2020-05-22 2021-01-15 2020-06-11 2021-01-29 2020-06-25 l nvelope mentation 1 stallation C1.1 eted areas MG-M2PATE-154067-CW-RFB Improving urban drainage, s Single Stage - One E 3,346,754.9 2021-04-3 / Travaux de confortement d IDA / 62450 ervices and resilience in targ Post Request for Bids Open - National 4,250,000.00 Signed 2020-02-11 2020-07-12 2020-02-27 2020-07-29 2020-04-13 2020-09-28 2020-06-12 2020-11-06 2020-07-04 2021-01-23 nvelope 1 0 es berges de l'Ikopa et de Sis eted areas aony MG-M2PATE-154084-CW-RFB Improving urban drainage, s / Travaux sur le Canal C3 et T Open - Internationa Single Stage - One E 18,100,000.0 14,019,238. 2022-07-1 IDA / 62450 ervices and resilience in targ Prior Request for Bids Signed 2020-02-20 2021-03-04 2020-03-05 2021-03-12 2020-04-20 2021-05-11 2020-05-16 2021-06-30 2020-05-27 2021-07-24 ravaux d'aménagement du si l nvelope 0 79 0 eted areas te de confinement des boues de curage MG-M2PATE-175075-CW-RF Q / Travaux de construction d Strenghtening institutional c Request for Quota Single Stage - One E Pending Imp 2020-10-1 e locaux techniques pour abri IDA / 62450 apacity for resilient urban go Post Limited 6,700.00 0.00 2020-06-20 2020-08-15 tions nvelope lementation 4 ter les équipements de com vernance munication de la Commune u rbaine d'Antananarivo MG-M2PATE-190058-CW-RFB Strenghtening institutional c Request for Quota Single Stage - One E 2021-02-0 / 2116/Réhabilitation du local IDA / 62450 apacity for resilient urban go Post Open - National 22,222.00 35,197.04 Signed 2020-09-12 2020-11-07 2022-06-24 tions nvelope 5 de la DGSF vernance MG-M2PATE-224442-CW-RFB / Travaux de réhabilitation de s infrastructures sanitaires et de mobilité (Travaux Quick W Improving urban drainage, s 4,555,911.3 2022-09-0 in – travaux facilement à exé IDA / 62450 ervices and resilience in targ Post Request for Bids 4,102,564.00 Signed 2021-06-11 2021-06-22 2021-06-18 2021-07-21 2021-07-18 2021-09-07 2021-08-17 2021-09-23 2021-09-08 2021-12-07 3 3 cuter) - première phase dans eted areas les Communes de Bemasoan dro, d’Anosizato Ouest, d’And ranonahoatra, d’Ampitatafika , des 1er et 4ème Arrondisse MG-M2PATE-224444-CW-RFB / Travaux de réhabilitation de s infrastructures sanitaires et de mobilité (Travaux Quick W Improving urban drainage, s Single Stage - One E 2023-01-0 in – travaux facilement à exé IDA / 62450 ervices and resilience in targ Post Request for Bids Open - National 4,615,385.00 0.00 Canceled 2021-10-01 2022-09-08 2021-10-08 2021-11-22 2021-12-22 2022-01-13 nvelope 8 cuter) - deuxième phase dan eted areas s les Communes de Bemasoa ndro, d’Anosizato Ouest, d’An dranonahoatra, d’Ampitatafik a, des 1er et 4ème Arrondiss e MG-M2PATE-224467-CW-RFB / Travaux de réfection de la p Improving urban drainage, s Single Stage - One E Pending Imp 2022-04-2 iste de desserte à Ambatoma IDA / 62450 ervices and resilience in targ Post Request for Bids Open - National 108,205.00 0.00 2021-07-30 2021-08-06 2021-09-05 2021-10-05 2021-10-27 nvelope lementation 5 inty – Iarinarivo-Ambatomitsa eted areas ngana- District d’Ambohidratr imo Request for Quota MG-M2PATE-259959-CW-RF Contingent Emergency Resp Request for Quota Single Stage - One E tions - Small Work 2021-12-1 Q / CERC_CUA- Travaux de ré IDA / 62450 Post Limited 34,108.00 118,059.15 Completed 2021-10-28 2021-11-19 2021-11-12 2021-12-11 onse Component (CERC) tions nvelope s (Emergency) SP 2 habilitation des CSB- Lot 3: C D -Competitive SB Volosarika MG-M2PATE-259964-CW-RF Request for Quota Q / CERC_CUA- Travaux d'am Contingent Emergency Resp Request for Quota Single Stage - One E tions - Small Work 2021-12-1 IDA / 62450 Post Limited 46,778.00 68,580.33 Completed 2021-10-28 2021-11-19 2021-11-12 2021-12-11 énagement du Centre Opérat onse Component (CERC) tions nvelope s (Emergency) SP 2 ionnel d'Urgence (COU) Anosi D -Competitive patrana MG-M2PATE-259941-CW-RF Request for Quota Q / CERC_CUA- Travaux de ré Contingent Emergency Resp Request for Quota Single Stage - One E tions - Small Work 2021-12-1 IDA / 62450 Post Limited 71,868.00 0.00 Canceled 2021-10-28 2021-11-12 habilitation des CSB- Lot 2: C onse Component (CERC) tions nvelope s (Emergency) SP 2 SB Andravoahangy D -Competitive Request for Quota MG-M2PATE-259922-CW-RF Contingent Emergency Resp Request for Quota Single Stage - One E tions - Small Work 2021-12-1 Q / CERC_CUA -Travaux de ré IDA / 62450 Post Limited 58,708.00 0.00 Canceled 2021-10-29 2021-11-11 onse Component (CERC) tions nvelope s (Emergency) SP 1 habilitations des CSB - Lot 1- D -Competitive CSB Isotry Page 1 MG-M2PATE-307673-CW-RFB / Travaux de réhabilitation de s infrastructures communaut Request for Bids - aires, sanitaires, de mobilité Improving urban drainage, s Single Stage - One E Works (without pr Under Imple 2024-01-2 et de drainage dans les Com IDA / 62450 ervices and resilience in targ Post Request for Bids Open - National 5,000,000.00 0.00 2022-08-16 2022-08-17 2022-08-22 2023-04-12 2022-09-21 2022-10-20 2022-10-10 2023-02-09 2022-12-02 nvelope equalification) SP mentation 4 munes de Bemasoandro, d’A eted areas D nosizato Ouest, d’Andranona hoatra et dans les 1er et 4èm e Arrondissements de la CUA – Deux phase – Répartis en 0 6 lot MG-M2PATE-314512-CW-DIR National Procure Improving urban drainage, s / Travaux de réhabilitation de ment Document - 2023-04-0 IDA / 62450 ervices and resilience in targ Post Direct Selection Direct - National 2,600,000.00 0.00 Signed 2022-09-14 2022-09-07 2022-09-19 2022-04-04 2022-10-10 s digues endommagées (Trav 1 Envelope proces 8 eted areas aux d’urgences prioritaires) s (Non Bank-SPD) MG-M2PATE-315076-CW-RF National Procure Q / 2_1_Mise en œuvre des a Strenghtening institutional c Request for Quota Single Stage - One E ment Document - Pending Imp 2023-03-0 ctivités prioritaires PARU : ré IDA / 62450 apacity for resilient urban go Post Open - National 22,500.00 0.00 2022-10-08 2022-12-03 tions nvelope 1 Envelope proces lementation 3 habilitation de 3 vannes endo vernance s (Non Bank-SPD) mmagés d'Ampitatafika et An osizato Ouest National Procure MG-M2PATE-358768-CW-DIR Improving urban drainage, s ment Document - Under Imple 2024-03-0 / 1.1_Travaux sur les sites de IDA / 62450 ervices and resilience in targ Post Direct Selection Direct - National 2,008,486.00 0.00 2023-05-02 2023-04-12 2023-05-05 2023-04-06 2023-05-11 1 Envelope proces mentation 6 réinstallation eted areas s (Non Bank-SPD) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-13250-GO-RFQ / Project Management, Coordi Request for Quota Single Stage - One E Acquisition de Matériels infor IDA / V0550 nation, Monitoring and Evalu Post Open - National 40,000.00 40,247.14 Signed 2017-04-25 2017-06-20 2018-09-24 2017-12-17 tions nvelope matiques et bureautiques ation MG-M2PATE-13261-GO-RFQ / Project Management, Coordi Request for Quota Single Stage - One E Acquisition de logiciels (Com IDA / V0550 nation, Monitoring and Evalu Post Open - National 40,000.00 32,630.27 Signed 2017-04-25 2017-06-20 2018-12-17 2017-12-17 tions nvelope ptabilité, SIG, Techniques, An ation tivirus) MG-M2PATE-13272-GO-RFQ / Project Management, Coordi Request for Quota Single Stage - One E Acquisition d'équipements et IDA / V0550 nation, Monitoring and Evalu Post Open - National 20,000.00 5,700.89 Signed 2017-04-25 2017-06-20 2018-09-24 2017-12-17 tions nvelope mobiliers de bureau ation MG-M2PATE-125027-GO-UN / Project Management, Coordi UN Agencies (Dire Under Imple Acquisition de voitures pour l IDA / 62450 nation, Monitoring and Evalu Post Direct 131,000.00 0.00 2019-07-29 2019-09-12 2019-08-13 2019-09-12 2019-09-13 2019-11-12 ct) mentation e fonctionnement de l'UGP ation MG-M2PATE-125036-GO-RFQ Project Management, Coordi Request for Quota Single Stage - One E Under Imple / Acquisition de motos pour l IDA / 62450 nation, Monitoring and Evalu Post Limited 10,000.00 0.00 2019-08-03 2019-09-13 2019-09-21 2019-10-21 tions nvelope mentation e fonctionnement de l'UGP ation MG-M2PATE-125037-GO-RFQ Project Management, Coordi / Achat groupé de matériel e Request for Quota Single Stage - One E Under Imple IDA / 62450 nation, Monitoring and Evalu Post Limited 92,222.22 0.00 2019-08-06 2019-09-13 2019-09-24 2019-11-08 t équipement informatique p tions nvelope mentation ation our la mise en œuvre du Proj et MG-M2PATE-125964-GO-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / Acquisition d'équipements e IDA / 62450 nation, Monitoring and Evalu Post Limited 4,777.78 0.00 2019-08-06 2019-09-24 2019-10-24 tions nvelope ementation t mobiliers de bureau pour l'U ation GP MG-M2PATE-125972-GO-RFQ / Acquisition de mobiliers de Strenghtening institutional c Request for Quota Single Stage - One E Under Imple bureau pour l'UGMP et mobili IDA / 62450 apacity for resilient urban go Post Limited 4,230.56 0.00 2019-09-14 2019-09-18 2019-10-19 2019-11-18 tions nvelope mentation er d'archivage des dossiers a vernance dministratifs du personnel MG-M2PATE-125977-GO-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl / acquisition de matériels info IDA / 62450 apacity for resilient urban go Post Limited 6,944.44 0.00 2019-09-14 2019-11-02 2019-12-02 tions nvelope ementation rmatique pour l'UGMP vernance MG-M2PATE-125983-GO-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / Fournitures de bureau pour IDA / 62450 nation, Monitoring and Evalu Post Limited 5,555.56 0.00 2019-08-07 2019-09-25 2019-10-10 tions nvelope ementation le fonctionnement de l'UGP ation MG-M2PATE-126085-GO-DIR Strenghtening institutional c / Acquisition d'une image Ort IDA / 62450 apacity for resilient urban go Post Direct Selection Direct 880.00 1,074.12 Signed 2019-08-12 2019-08-26 2019-08-17 2019-08-27 2019-09-01 2019-08-28 2019-09-21 hophoto dans le cadre des ac vernance tivités de l'OATF MG-M2PATE-172029-GO-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl / Acquisition de poubelles po IDA / 62450 apacity for resilient urban go Post Limited 101,891.00 0.00 2020-05-05 2020-06-13 2020-07-03 tions nvelope ementation ur la Commune Urbaine d'Ant vernance ananarivo MG-M2PATE-172030-GO-RFQ / Acquisition d'équipements d Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl e protection individuelle et d IDA / 62450 apacity for resilient urban go Post Limited 17,200.00 0.00 2020-05-05 2020-06-13 2020-12-10 tions nvelope ementation e combinaisons pour la Com vernance mune Urbaine d'Antananariv o MG-M2PATE-172074-GO-RFQ Strenghtening institutional c / Acquisition de charettes à b Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Limited 12,000.00 0.00 2020-05-05 2020-06-23 2020-07-23 ras pour la Commune Urbain tions nvelope ementation vernance e d'Antananarivo MG-M2PATE-172281-GO-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl / Fourniture d'autocollants po IDA / 62450 apacity for resilient urban go Post Limited 2,600.00 0.00 2020-05-05 2020-06-23 2020-06-28 tions nvelope ementation ur la Commune Urbaine d'Ant vernance ananarivo MG-M2PATE-175032-GO-RFQ Strenghtening institutional c / Acquisition d'équipements d Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Limited 59,783.00 0.00 2020-06-20 2020-08-13 2020-09-12 e communication pour la Co tions nvelope ementation vernance mmune urbaine d'Antananari vo MG-M2PATE-175069-NC-RFQ Strenghtening institutional c / Impression d'affiches pour l' Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Limited 8,333.00 0.00 2020-07-11 2020-09-05 2020-10-05 IEC dans la Commune urbain tions nvelope ementation vernance e d'Antananarivo MG-M2PATE-189973-GO-RFQ Strenghtening institutional c / 2242/Acquisition de matérie Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Limited 1,388.89 0.00 2020-09-12 2020-11-07 2020-12-07 ls informatiques pour la prép tions nvelope ementation vernance aration du diagnostic RH Page 2 MG-M2PATE-189975-GO-RFQ Strenghtening institutional c / 2123/Acquisition d'imprima Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Request for Bids Limited 8,889.00 0.00 2020-09-07 2020-09-12 2020-10-24 2020-11-23 2020-12-28 2020-12-31 nte et de modems USB pour l nvelope ementation vernance es Communes - MATAC MG-M2PATE-189976-GO-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / 3132/Assurances Santé pers IDA / 62450 nation, Monitoring and Evalu Post Limited 2,800.00 0.00 2020-08-29 2020-10-24 2020-10-24 tions nvelope ementation onnel UGP et famille ation MG-M2PATE-189977-GO-RFQ Project Management, Coordi / 3131/Acquisitions fourniture Request for Quota Single Stage - One E Pending Impl IDA / 62450 nation, Monitoring and Evalu Post Limited 12,000.00 0.00 2020-09-12 2020-11-07 2020-12-07 s de bureau , consommables tions nvelope ementation ation et produits d'entretien de bur eau MG-M2PATE-190004-GO-RFQ Strenghtening institutional c / 2122/Acquisition de matérie Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Request for Bids Limited 1,945.00 0.00 2020-09-07 2020-09-12 2020-10-24 2020-11-23 2020-12-28 2021-01-27 ls et fournitures informatique nvelope ementation vernance s pour OATF-Atlas Urbain MG-M2PATE-190014-GO-RFB Strenghtening institutional c Single Stage - One E Pending Impl / 2116/Acquisition de matérie IDA / 62450 apacity for resilient urban go Post Request for Bids Limited 114,594.00 0.00 2020-09-07 2020-09-12 2020-10-24 2020-11-23 2020-12-28 2021-01-27 nvelope ementation ls informatiques pour DGSF vernance MG-M2PATE-190017-GO-RFQ / 2114/Acquisition d'un drone Strenghtening institutional c Request for Quota Single Stage - One E , de matériels informatiques, IDA / 62450 apacity for resilient urban go Post Limited 29,200.00 24,690.75 Completed 2020-09-12 2021-05-10 2020-11-07 2021-08-10 2020-12-07 2021-10-01 tions nvelope de GPS, des tablettes et des vernance Power bank pour OATF-Fonci er urbain MG-M2PATE-190062-GO-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Under Imple / 2116/Acquisition matériels t IDA / 62450 apacity for resilient urban go Post Open - National 3,000.00 0.00 2020-09-12 2020-11-07 2020-12-07 tions nvelope mentation echniques pour la DGSF vernance MG-M2PATE-190069-GO-RFQ Strenghtening institutional c Request for Quota Single Stage - One E / 2116/Acquisition de mobilie IDA / 62450 apacity for resilient urban go Post Limited 5,694.00 3,174.07 Completed 2020-09-12 2021-07-30 2020-11-07 2021-12-09 2020-12-07 2021-12-24 tions nvelope rs de bureau pour la DGSF vernance MG-M2PATE-191454-GO-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / 3- Achat de fournitures de b IDA / 62450 nation, Monitoring and Evalu Post Limited 4,800.00 0.00 2020-09-19 2020-11-14 2020-12-04 tions nvelope ementation ureau pour l'UGP ation MG-M2PATE-191456-GO-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / 3- Achat de consommables i IDA / 62450 nation, Monitoring and Evalu Post Limited 9,500.00 0.00 2020-09-27 2020-11-22 2020-12-22 tions nvelope ementation nformatiques pour l'UGP ation MG-M2PATE-191460-GO-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / 3-Achat de produits d'entret IDA / 62450 nation, Monitoring and Evalu Post Open - National 1,600.00 0.00 2020-09-20 2020-11-15 2020-12-05 tions nvelope ementation ien pour l'UGP ation MG-M2PATE-208783-GO-RFB Contingent Emergency Resp Single Stage - One E / CERC_wash_cua_ Achat de c IDA / 62450 Post Request for Bids Open - National 575,000.00 406,983.22 Completed 2021-01-22 2021-02-13 2021-01-27 2021-06-30 2021-02-26 2021-03-01 2021-03-05 2021-03-12 2021-03-26 2021-04-10 2021-06-24 2022-01-01 onse Component (CERC) nvelope amions citernes à eau potabl e MG-M2PATE-175037-GO-RFQ Strenghtening institutional c / 2341 Acquisition d'ordinate Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Limited 5,000.00 0.00 2021-02-21 2021-04-18 2021-05-18 urs portables dans le cadre d tions nvelope ementation vernance e la réalisation de l'IEC dans l a CUA MG-M2PATE-217181-GO-DIR Contingent Emergency Resp / CERC_cua Acquisition de m IDA / 62450 Post Direct Selection Direct 50,000.00 47,704.91 Completed 2021-02-16 2021-10-11 2021-02-21 2021-11-23 2021-03-08 2021-12-03 2021-07-06 2022-01-01 onse Component (CERC) atériels pour les gestes barri ères MG-M2PATE-217183-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_cua Acquisition de ch IDA / 62450 Post Open - National 170,000.00 101,253.17 Completed 2021-02-21 2022-02-09 2021-04-04 2021-12-04 2021-09-01 2022-01-01 onse Component (CERC) tions nvelope arrettes à bras MG-M2PATE-218468-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_ugp Achat de cartouc IDA / 62450 Post Limited 760.00 552.39 Completed 2021-02-27 2021-09-21 2021-04-06 2021-10-29 2021-07-05 2021-11-05 onse Component (CERC) tions nvelope hes d'encre pour imprimante s MG-M2PATE-218469-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_ugp Achat de produit IDA / 62450 Post Open - National 3,400.00 2,950.63 Completed 2021-02-27 2022-02-08 2021-04-10 2021-11-20 2021-05-10 2022-01-01 onse Component (CERC) tions nvelope s et matériels de nettoyage MG-M2PATE-218471-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_ugp Achats d'Equipe IDA / 62450 Post Open - National 5,600.00 5,042.20 Completed 2021-02-27 2021-04-03 2021-12-22 2021-04-24 2022-01-01 onse Component (CERC) tions nvelope ments de Protection Individu elle MG-M2PATE-228552-GO-RFQ Strenghtening institutional c / 2217 Matériels et équipeme Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Limited 8,110.00 0.00 2021-04-24 2021-06-19 2021-08-18 nts informatiques pour la séc tions nvelope ementation vernance urisation foncière MG-M2PATE-228680-GO-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / Acquisition de matériels et l IDA / 62450 nation, Monitoring and Evalu Post Limited 23,785.00 0.00 2021-04-24 2021-06-19 2021-08-18 tions nvelope ementation ogiciels pour l'UEMP ation MG-M2PATE-228749-GO-RFQ / CERC-CUA_ Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E Pending Impl els pour la plateforme de pai IDA / 62450 Post Limited 247,436.00 0.00 2021-04-27 2021-06-22 2021-08-21 onse Component (CERC) tions nvelope ementation ement numérique. Lot 1 : dat a center et ordinateurs MG-M2PATE-228753-GO-RFQ / CERC-CUA _Achat de fournit Contingent Emergency Resp Request for Quota Single Stage - One E Pending Impl IDA / 62450 Post Limited 45,000.00 0.00 2021-04-28 2021-06-23 2021-07-23 ures pour les Dispositifs de L onse Component (CERC) tions nvelope ementation avage des Mains (DLM). Lot 2 : Achat de HTH MG-M2PATE-217179-GO-DIR Contingent Emergency Resp / CERC_CUA : Achat camions IDA / 62450 Post Direct Selection Direct 690,000.00 680,589.00 Completed 2021-04-19 2021-03-24 2021-04-24 2021-03-24 2021-05-19 2021-08-04 2021-08-17 2021-11-04 onse Component (CERC) benne multiusage MG-M2PATE-252543-GO-RFQ / CERC_CUA_Achat d'équipe Contingent Emergency Resp Request for Quota Single Stage - One E ments de protection individu IDA / 62450 Post Open - National 128,000.00 84,913.44 Completed 2021-09-25 2022-02-08 2021-11-20 2021-11-20 2021-12-20 2022-01-01 onse Component (CERC) tions nvelope els (EPI) aux employés de la CUA, Lot 1: combinaisons en tissu MG-M2PATE-252547-GO-RFQ / CERC_CUA_Achat d'équipe ments de protection individu Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 119,584.00 35,327.55 Completed 2021-09-25 2022-02-08 2021-11-20 2021-11-20 2021-12-20 2022-01-01 els (EPI) aux employés de la onse Component (CERC) tions nvelope CUA, Lot 2: Combinaison de p rotection intégrales (DEAH), bottes, gants, visières Page 3 MG-M2PATE-252570-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E Under Imple / CERC_CUA_Achat de matéri IDA / 62450 Post Open - National 140,000.00 0.00 2021-10-09 2021-12-04 2021-12-19 onse Component (CERC) tions nvelope mentation els informatiques pour les CS B MG-M2PATE-252571-GO-RFQ Improving urban drainage, s Request for Quota Single Stage - One E Pending Impl / 1.3 Edition et reproduction IDA / 62450 ervices and resilience in targ Post Limited 800.00 0.00 2021-10-27 2021-12-22 2022-06-20 tions nvelope ementation des outils MGP eted areas MG-M2PATE-252766-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_CUA_Achat de mobilie IDA / 62450 Post Open - National 40,000.00 97,482.94 Completed 2021-09-25 2022-02-11 2021-11-20 2022-01-01 2021-12-20 2022-01-01 onse Component (CERC) tions nvelope rs de bureau MG-M2PATE-252769-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_CUA_Petits instrumen IDA / 62450 Post Open - National 50,000.00 71,710.08 Completed 2021-09-28 2022-02-09 2021-11-23 2021-12-21 2021-12-23 2022-01-01 onse Component (CERC) tions nvelope ts et matériels médicaux MG-M2PATE-252899-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E Pending Impl / CERC_CUA_Achat équipeme IDA / 62450 Post Open - National 60,000.00 0.00 2021-10-02 2021-11-27 2021-12-27 onse Component (CERC) tions nvelope ementation nts COU - Lot 1: Mobiliers MG-M2PATE-252900-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E Pending Impl / CERC_CUA_Achat équipeme IDA / 62450 Post Open - National 240,000.00 0.00 2021-10-05 2021-11-30 2021-12-30 onse Component (CERC) tions nvelope ementation nts COU - Lot 2: Matériels inf ormatiques MG-M2PATE-252993-GO-RFQ / CERC_CUA Achat de fournit Contingent Emergency Resp Request for Quota Single Stage - One E ures pour les Dispositifs de L IDA / 62450 Post Open - National 60,000.00 17,920.05 Completed 2021-09-26 2022-02-09 2021-11-01 2021-12-02 2021-12-01 2022-01-01 onse Component (CERC) tions nvelope avage des Mains (DLM). Lot 1 : Gel désinfectant mains MG-M2PATE-252997-GO-RFQ / CERC_CUA Achat de fournit Contingent Emergency Resp Request for Quota Single Stage - One E Under Imple IDA / 62450 Post Open - National 10,000.00 0.00 2021-09-22 2022-02-09 2021-10-26 2021-11-25 ures pour les Dispositifs de L onse Component (CERC) tions nvelope mentation avage des Mains (DLM). Lot 2 : Achat de HTH MG-M2PATE-252999-GO-RFQ / CERC_CUA Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E Pending Impl els pour la plateforme de pai IDA / 62450 Post Limited 282,102.00 0.00 2021-09-28 2021-11-07 2021-12-07 onse Component (CERC) tions nvelope ementation ement numérique. Lot 1 : Dat a center et ordinateurs MG-M2PATE-253002-GO-RFQ / CERC_CUA Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 102,000.00 81,816.98 Completed 2021-09-28 2021-12-15 2021-11-07 2021-12-30 2021-12-07 2022-01-01 els pour la plateforme de pai onse Component (CERC) tions nvelope ement numérique. Lot 2 : Sm artphones : MG-M2PATE-253008-GO-RFQ / CERC_CUA _ Achat de matér Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 32,830.00 16,641.80 Completed 2021-09-21 2022-02-10 2021-11-03 2022-01-01 2021-12-03 2022-01-01 iels et outillages de ramassa onse Component (CERC) tions nvelope ge d'ordures. Lot 3 : brouette s MG-M2PATE-256966-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_ugp Achat de Gels ma IDA / 62450 Post Open - National 20,000.00 9,567.80 Completed 2021-10-16 2022-02-11 2021-11-25 2022-01-01 2021-12-05 2022-01-01 onse Component (CERC) tions nvelope ins et produits de nettoyage MG-M2PATE-256968-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E Pending Impl IDA / 62450 Post Limited 3,077.00 0.00 2021-10-17 2021-11-26 2021-12-06 / CERC_ugp Achat de Toner d onse Component (CERC) tions nvelope ementation 'encre MG-M2PATE-257538-GO-RFQ / CERC_CUA Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 210,250.00 100,828.00 Completed 2021-10-16 2022-02-08 2021-11-23 2021-11-20 2021-12-13 2021-12-20 els et outillage de ramassage onse Component (CERC) tions nvelope d'ordures. Lot 1: BAlais et fou rches MG-M2PATE-257539-GO-RFQ / CERC_CUA Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 205,130.00 122,506.02 Completed 2021-10-16 2022-02-08 2021-11-23 2021-11-20 2021-12-13 2021-12-03 el et outillage de ramassage onse Component (CERC) tions nvelope d'ordures. Lot 2: Poubelles ro ulantes MG-M2PATE-259895-GO-RFQ / CERC_ CUA -Acquisition de c Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 263,500.00 235,704.36 Completed 2021-10-29 2021-12-23 2021-11-21 2022-01-01 2021-12-01 2022-01-01 amions pour la CUA. Lot 1- C onse Component (CERC) tions nvelope amions Bennes MG-M2PATE-259896-GO-RFQ / CERC_CUA -Acquisition de c Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 263,500.00 235,704.36 Completed 2021-10-29 2021-12-23 2021-11-21 2022-01-01 2021-12-01 2022-01-01 amions pour la CUA- Lot 2- C onse Component (CERC) tions nvelope amions Plâteaux MG-M2PATE-263322-GO-RFB Strenghtening institutional c Single Stage - One E / 2313_APIPA Acquisition d'un IDA / 62450 apacity for resilient urban go Post Request for Bids Open - National 331,200.00 323,908.71 Completed 2021-12-01 2021-12-31 2021-12-04 2022-01-03 2022-02-01 2022-01-18 2022-02-18 2022-02-22 2022-03-15 2022-04-23 2022-05-10 nvelope engin "pelle mécanique à pn vernance eus" MG-M2PATE-263001-GO-RFQ Strenghtening institutional c / 1342 Acquisition de gilets (k Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Open - National 5,400.00 0.00 2021-12-06 2022-01-17 2022-02-16 its de visibilité) pour les mem tions nvelope ementation vernance bres des équipes locales de s ecours MG-M2PATE-268631-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC-CUA_ Achat de deux b IDA / 62450 Post Open - National 140,000.00 139,383.52 Completed 2021-12-18 2022-02-10 2021-12-25 2021-12-31 2021-12-30 2022-01-01 onse Component (CERC) tions nvelope us pour le Centre d'accueil MG-M2PATE-276702-GO-RFQ / CERC2_ Lot 1 - Acquisition d Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 56,250.00 30,811.09 Completed 2022-02-16 2022-04-13 2022-06-18 2022-10-10 2022-06-28 e cinq (05) groupes électrogè onse Component (CERC) tions nvelope nes 10 KVA pour la CUA MG-M2PATE-276709-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC2_Lot 2 - Pelles - Achat IDA / 62450 Post Open - National 56,250.00 48,854.00 Completed 2022-02-16 2022-04-13 2022-06-18 2022-10-10 2022-06-23 onse Component (CERC) tions nvelope de matériels et outillage pour dessablage MG-M2PATE-276711-GO-DIR Improving urban drainage, s / SC 1.3 GRC _Achat de pieux IDA / 62450 ervices and resilience in targ Post Direct Selection Direct 6,250.00 6,594.21 Completed 2022-02-07 2022-02-01 2022-02-09 2022-02-02 2022-02-14 2022-02-03 2022-02-21 2022-02-10 en bois rond pour le renforce eted areas ment des digues de l'APIPA MG-M2PATE-276714-GO-RFQ / CERC2_Lot 3 - Bêches - Ach Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 5,000.00 1,025.93 Completed 2022-02-16 2022-04-13 2022-06-15 2022-10-10 2022-06-21 at de matériels et outillage p onse Component (CERC) tions nvelope our dessablage MG-M2PATE-276716-GO-RFQ / CERC2_Lot 1 - Imperméable Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 35,000.00 8,370.70 Completed 2022-02-16 2022-04-13 2022-06-15 2022-10-10 2022-06-25 s - Achat d'équipements de p onse Component (CERC) tions nvelope rotection individuelle Page 4 MG-M2PATE-276717-GO-RFQ / CERC2_Lot 2 - Casques de c Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 27,500.00 13,678.31 Completed 2022-02-16 2022-04-13 2022-06-15 2022-10-10 2022-06-20 hantier - Achat d'équipement onse Component (CERC) tions nvelope s de protection individuelle MG-M2PATE-276721-GO-RFQ / CERC2_Lot 3 - Gants de séc Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 6,250.00 2,112.48 Completed 2022-02-16 2022-04-13 2022-06-15 2022-10-10 2022-06-21 urité - Achat d'équipements d onse Component (CERC) tions nvelope e protection individuelle MG-M2PATE-299934-GO-DIR Project Management, Coordi Pending Impl / 3.1_Acquisition de logiciels IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct 34,500.00 0.00 2022-07-01 2022-07-06 2022-08-10 2022-09-09 ementation Tom2Pro - SOFTWELL ation MG-M2PATE-301390-GO-RFQ / 2.3_Acquisition de lots de m Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl atériels de nettoyage des rue IDA / 62450 apacity for resilient urban go Post Open - National 8,200.00 0.00 2022-08-06 2022-10-01 2022-11-30 tions nvelope ementation lles et canaux: angady, sobik vernance a, balais, râteaux, fourche, p elles, brouettes MG-M2PATE-301395-GO-RFQ / 2.3_Acquisition d'équipeme nts de protection individuelle Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl pour les communes périphéri IDA / 62450 apacity for resilient urban go Post Open - National 8,100.00 0.00 2022-08-06 2022-10-01 2022-11-15 tions nvelope ementation ques: imperméables, gilets, c vernance ombinaison/ tablier, masque/ cache bouche, bottes/ chauss ures, gants MG-M2PATE-293750-GO-RFB / CERC2_Achat de poteaux so Contingent Emergency Resp Single Stage - One E IDA / 62450 Post Request for Bids Open - National 110,000.00 0.00 Canceled 2022-05-16 2022-05-27 2022-05-21 2022-07-02 2022-06-07 2022-08-01 2022-09-05 2023-03-04 laires pour l'éclairage des zo onse Component (CERC) nvelope nes non desservies par l'élect ricité MG-M2PATE-276722-GO-RFQ / CERC2_Lot 4 - Lampes solai Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 13,750.00 0.00 Canceled 2022-02-16 2022-04-13 2022-10-10 res - Achat d'équipements de onse Component (CERC) tions nvelope protection individuelle MG-M2PATE-276724-GO-RFQ / CERC2_Lot 5 - Torches front Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 15,750.00 0.00 Canceled 2022-02-16 2022-04-13 2022-10-10 ales - Achat d'équipements d onse Component (CERC) tions nvelope e protection individuelle MG-M2PATE-276725-GO-RFQ / CERC2_Lot 6 - Torches norm Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 15,750.00 0.00 Canceled 2022-02-16 2022-04-13 2022-10-10 ales - Achat d'équipements d onse Component (CERC) tions nvelope e protection individuelle MG-M2PATE-276728-GO-RFQ / CERC2_Lot 1 - Tentes pour Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 550,000.00 0.00 Canceled 2022-02-16 2022-04-13 2022-10-10 50 personnes - Achat de mat onse Component (CERC) tions nvelope ériels et équipements pour le s abris et sinistrés MG-M2PATE-276729-GO-RFQ / CERC2_Lot 2 - Tentes 6m x Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 35,000.00 0.00 Canceled 2022-02-16 2022-04-13 2022-10-10 4m - Achat de matériels et é onse Component (CERC) tions nvelope quipements pour les abris et sinistrés MG-M2PATE-293754-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC2_Achat de palettes po IDA / 62450 Post Limited 12,500.00 0.00 Canceled 2022-05-21 2022-07-16 2023-01-12 onse Component (CERC) tions nvelope ur usage multiple pour l'abri des sinistrés MG-M2PATE-276706-GO-RFQ / CERC2_Lot 1 - Râteaux - Ac Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 8,750.00 0.00 Canceled 2022-02-16 2022-04-13 2022-10-10 hat de matériels et outillage onse Component (CERC) tions nvelope pour dessablage MG-M2PATE-276705-GO-RFQ / CERC2_Lot 2 - Acquisition d Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 10,000.00 0.00 Canceled 2022-02-16 2022-04-13 2022-10-10 e quatre (04) groupes électro onse Component (CERC) tions nvelope gènes pour les communes pé riphériques MG-M2PATE-293740-GO-RFQ / CERC2_Lot 1 - Cordes - Ach Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 1,000.00 0.00 Canceled 2022-05-21 2022-07-16 2023-01-12 at de matériels pour usages onse Component (CERC) tions nvelope multiples par les sapeurs po mpiers MG-M2PATE-293744-GO-RFQ / CERC2_Lot 2 - Harnais et Co Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 1,750.00 0.00 Canceled 2022-05-21 2022-07-16 2023-01-12 rdes - Achat de matériels pou onse Component (CERC) tions nvelope r usages multiples par les sa peurs pompiers MG-M2PATE-293745-GO-RFQ / CERC2_Lot 3 - Chaines à ma Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 5,000.00 0.00 Canceled 2022-05-21 2022-07-16 2023-01-12 illon - Achat de matériels pou onse Component (CERC) tions nvelope r usages multiples par les sa peurs pompiers MG-M2PATE-293749-GO-RFQ / CERC2_Lot 4 - Rubalise de c Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 1,875.00 0.00 Canceled 2022-05-21 2022-07-16 2023-01-12 hantier - Achat de matériels onse Component (CERC) tions nvelope pour usages multiples par les sapeurs pompiers MG-M2PATE-217182-GO-RFQ / CERC_cua Achat de citernes Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 75,000.00 0.00 Canceled 2021-02-21 2021-04-12 2021-08-10 de 1000 litres avec supports onse Component (CERC) tions nvelope pour les Dispositifs de lavage des mains MG-M2PATE-260023-GO-DIR Contingent Emergency Resp / CERC_CUA -Acquisition de d IDA / 62450 Post Direct Selection Direct 140,000.00 0.00 Canceled 2021-11-02 2021-11-05 2021-11-20 2022-05-19 onse Component (CERC) eux (02) bus pour le Centre d 'accueil MG-M2PATE-227529-GO-RFQ / CERC_CUA Achat d'équipem Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 17,000.00 0.00 Canceled 2021-05-01 2021-06-15 2021-08-14 ent pour le Centre d'héberge onse Component (CERC) tions nvelope ment. lot 2: matelas MG-M2PATE-208772-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_ugp_ Achat de trois ar IDA / 62450 Post Limited 417.00 0.00 Canceled 2021-01-09 2021-02-27 2021-03-29 onse Component (CERC) tions nvelope moires métalliques MG-M2PATE-252763-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_CUA_Achat de fournit IDA / 62450 Post Open - National 20,000.00 0.00 Canceled 2021-09-25 2021-11-20 2021-12-20 onse Component (CERC) tions nvelope ures de bureau Page 5 MG-M2PATE-227525-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_CUA Achat de matéri IDA / 62450 Post Open - National 2,800.00 0.00 Canceled 2021-05-01 2021-06-20 2021-08-04 onse Component (CERC) tions nvelope els et équipement de cuisine MG-M2PATE-276737-GO-RFQ / CERC2_Acquisition de moto Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 12,000.00 0.00 Canceled 2022-02-15 2022-03-25 2022-04-01 pompes répartis en trois (03) onse Component (CERC) tions nvelope lots , lot 2 : Motopompe pour l'APIPA MG-M2PATE-227528-GO-RFQ / CERC_CUA Achat d'équipem Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 27,000.00 0.00 Canceled 2021-05-01 2021-06-15 2021-08-14 ent pour le Centre d'héberge onse Component (CERC) tions nvelope ment. Lot 1 : lits MG-M2PATE-276701-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC2_Achat de sac de tran IDA / 62450 Post Open - National 9,000.00 0.00 Canceled 2022-02-14 2022-03-20 2022-03-25 onse Component (CERC) tions nvelope sport de sable pour l'APIPA MG-M2PATE-218467-GO-RFQ / CERC_cua Achat de fournitu Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 45,000.00 0.00 Canceled 2021-02-27 2021-04-10 2021-09-17 res pour les Dispositifs de La onse Component (CERC) tions nvelope vage des Mains (DLM) MG-M2PATE-276734-GO-RFQ / CERC2_Achat de motopomp Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 17,000.00 0.00 Canceled 2022-02-19 2022-03-21 2022-04-05 es répartis en trois (03) lots : onse Component (CERC) tions nvelope lot 1- Cinq (05) motopompes pour la CUA MG-M2PATE-228683-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_CUA_ Achat d'un mini IDA / 62450 Post Limited 80,000.00 0.00 Canceled 2021-04-24 2021-06-05 2021-07-20 onse Component (CERC) tions nvelope bus pour le Centre d'accueil MG-M2PATE-228707-GO-RFQ / CERC_CUA_ Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 210,250.00 0.00 Canceled 2021-05-01 2021-06-19 2021-07-19 els et outillages de ramassag onse Component (CERC) tions nvelope e d'ordures- Lot 1 : balais, fo urches MG-M2PATE-217184-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_cua Achat de matériel IDA / 62450 Post Open - National 5,000.00 0.00 Canceled 2021-03-06 2021-04-25 2021-06-09 onse Component (CERC) tions nvelope s de maintenance des charre ttes MG-M2PATE-276740-GO-RFQ / CERC2_Acquisition de moto Contingent Emergency Resp Request for Quota Single Stage - One E pompes répartis en trois (03) IDA / 62450 Post Limited 13,600.00 0.00 Canceled 2022-02-15 2022-03-23 2022-03-30 onse Component (CERC) tions nvelope lots: lot 3-Motopompe pour le s Communes périphériques MG-M2PATE-227523-GO-RFQ / CERC_CUA Achat d'équipem Contingent Emergency Resp Request for Quota Single Stage - One E ents de protection individuell IDA / 62450 Post Open - National 246,000.00 0.00 Canceled 2021-04-24 2021-06-08 2021-07-23 onse Component (CERC) tions nvelope es (EPI) aux employés de la C UA y compris pour la gestion des cadavres MG-M2PATE-276731-GO-RFQ / CERC2_Acquisition de sanita Contingent Emergency Resp Request for Quota Single Stage - One E ires mobiles pour les sites d'h IDA / 62450 Post Open - National 262,500.00 0.00 Canceled 2022-02-14 2022-03-16 2022-03-31 onse Component (CERC) tions nvelope ébergement de la CUA et des Communes périphériques MG-M2PATE-252998-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_CUA Achat de matéri IDA / 62450 Post Open - National 10,000.00 0.00 Canceled 2021-09-22 2021-11-01 2021-12-01 onse Component (CERC) tions nvelope els de maintenance des charr ettes MG-M2PATE-228710-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC_CUA Achat de matéri IDA / 62450 Post Limited 12,490.00 0.00 Canceled 2021-05-01 2021-06-19 2021-08-18 onse Component (CERC) tions nvelope els et équipements pour CSB II MG-M2PATE-227524-GO-RFQ / CERC_CUA Achat de combin Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 1,950.00 0.00 Canceled 2021-04-17 2021-06-01 2021-07-01 aisons intégrales pour la gest onse Component (CERC) tions nvelope ion des cadavres MG-M2PATE-228754-GO-RFQ / CERC-CUA_ Achat de cellule Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 179,490.00 0.00 Canceled 2021-05-08 2021-06-26 2021-09-24 s de conservation frigorifique onse Component (CERC) tions nvelope cellule de 03 places MG-M2PATE-276726-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC2_Acquisition de tracto IDA / 62450 Post Open - National 225,000.00 0.00 Canceled 2022-02-14 2022-03-21 2022-03-28 onse Component (CERC) tions nvelope pelle pour la CUA MG-M2PATE-228706-GO-RFQ / CERC_CUA_ Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 37,570.00 0.00 Canceled 2021-05-01 2021-06-12 2021-07-27 els et équipement de transpo onse Component (CERC) tions nvelope rt des cadavres MG-M2PATE-217187-GO-DIR Contingent Emergency Resp / CERC_cua Achat d'un véhic IDA / 62450 Post Direct Selection Direct 80,000.00 0.00 Canceled 2021-03-15 2021-03-20 2021-04-18 2021-06-02 onse Component (CERC) ule médicalisé MG-M2PATE-228742-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E / CERC-CUA_ Achat de fournit IDA / 62450 Post Limited 590.00 0.00 Canceled 2021-05-22 2021-07-10 2021-08-09 onse Component (CERC) tions nvelope ures de bureau pour les CSB I I MG-M2PATE-276693-GO-RFQ Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 3,000.00 0.00 Canceled 2022-02-26 2022-04-23 2022-10-20 / CERC2_Achat de Toners d'e onse Component (CERC) tions nvelope ncre MG-M2PATE-228709-GO-RFQ / CERC_CUA_ Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 32,830.00 0.00 Canceled 2021-05-01 2021-06-19 2021-08-03 els et outillages de ramassag onse Component (CERC) tions nvelope e d'ordures. Lot 3 : brouettes MG-M2PATE-228708-GO-RFQ / CERC_CUA_ Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 205,130.00 0.00 Canceled 2021-05-01 2021-06-19 2021-08-03 els et outillages de ramassag onse Component (CERC) tions nvelope e d'ordures. Lot 2 : poubelles roulantes MG-M2PATE-228752-GO-RFQ / CERC-CUA_ Achat de fournit Contingent Emergency Resp Request for Quota Single Stage - One E ures pour les Dispositifs de L IDA / 62450 Post Limited 45,000.00 0.00 Canceled 2021-04-27 2021-06-15 2021-07-15 onse Component (CERC) tions nvelope avage des Mains (DLM). Lot 1 : Gel désinfectant mains Page 6 MG-M2PATE-228750-GO-RFQ / CERC-CUA_ Achat de matéri Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Limited 87,000.00 0.00 Canceled 2021-04-27 2021-06-22 2021-08-21 els pour la plateforme de pai onse Component (CERC) tions nvelope ement numérique. Lot 2 : Sm artphones MG-M2PATE-276715-GO-RFQ / CERC2_Lot 4 - Brouettes - A Contingent Emergency Resp Request for Quota Single Stage - One E IDA / 62450 Post Open - National 25,000.00 0.00 Canceled 2022-02-16 2022-04-13 2022-10-10 chat de matériels et outillage onse Component (CERC) tions nvelope pour dessablage MG-M2PATE-315043-GO-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl / 2.3_Acquisition de charrette IDA / 62450 apacity for resilient urban go Post Open - National 100,000.00 0.00 2022-10-08 2022-12-03 2023-03-03 tions nvelope ementation s pour les communes périphé vernance riques MG-M2PATE-315045-GO-RFB Improving urban drainage, s Single Stage - One E Pending Impl / Acquisition de 6 camions be IDA / 62450 ervices and resilience in targ Post Request for Bids Open - National 544,400.00 0.00 2022-10-03 2022-10-08 2022-11-19 2022-12-19 2023-01-23 2023-04-23 nvelope ementation nnes (Apipa et Communes pé eted areas riphériques) MG-M2PATE-315055-GO-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl IDA / 62450 Post Open - National 2,500.00 0.00 2022-10-08 2022-12-03 2022-12-18 / 2_1_Duplication du PARU apacity for resilient urban go tions nvelope ementation vernance MG-M2PATE-324288-GO-DIR Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / 3_Acquisition de motos pour IDA / 62450 nation, Monitoring and Evalu Post Open - National 8,750.00 0.00 2022-11-21 2023-01-16 2023-02-15 tions nvelope ementation les Guichets fonciers appui a ation u projet MG-M2PATE-324536-GO-DIR Project Management, Coordi / 3_Acquisition de matériels i Request for Quota Single Stage - One E Pending Impl IDA / 62450 nation, Monitoring and Evalu Post Open - National 50,000.00 0.00 2022-11-21 2023-01-16 2023-02-15 nformatiques et techniques p tions nvelope ementation ation our les guichets fonciers app ui au projet MG-M2PATE-324531-GO-DIR Project Management, Coordi / 3_Achat de fournitures de b Request for Quota Single Stage - One E Pending Impl IDA / 62450 nation, Monitoring and Evalu Post Open - National 5,000.00 0.00 2022-11-24 2023-01-19 2023-02-18 ureau pour les guichets uniq tions nvelope ementation ation ues appui au projet MG-M2PATE-324523-GO-DIR Project Management, Coordi / 3_Acquisition d'équipement Request for Quota Single Stage - One E Pending Impl IDA / 62450 nation, Monitoring and Evalu Post Open - National 7,500.00 0.00 2022-11-24 2023-01-15 2023-02-14 solaire du guichet foncier app tions nvelope ementation ation ui au projet pour Iarinarivo MG-M2PATE-324525-GO-DIR Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / 3_Acquisition mobilier pour l IDA / 62450 nation, Monitoring and Evalu Post Open - National 20,000.00 0.00 2022-11-24 2023-01-19 2023-02-18 tions nvelope ementation es guichets fonciers appui au ation projet NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-102997-NC-RFQ Improving urban drainage, s / Mission d'investigations phy Request for Quota Single Stage - One E IDA / V0550 ervices and resilience in targ Post Limited 12,000.00 9,345.74 Signed 2019-02-27 2018-10-12 2019-03-06 2018-11-22 2019-03-19 siques des sites de dépôt et tions nvelope eted areas de confinement des boues de curage MG-M2PATE-126092-NC-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / Prestation de dédouanemen IDA / 62450 nation, Monitoring and Evalu Post Limited 2,777.78 0.00 2019-09-21 2019-11-09 2019-11-12 tions nvelope ementation t des véhicules ation MG-MAHTP-132997-NC-DIR / Strenghtening institutional c Recrutement d’un prestataire Pending Impl IDA / 62450 apacity for resilient urban go Post Direct Selection Direct 83,000.00 0.00 2019-09-11 2019-09-16 2019-10-01 2019-10-11 pour appui à la logistique du ementation vernance Forum National Urbain 3è édi tion MG-M2PATE-172088-NC-RFQ Strenghtening institutional c / Prestation de service de loc Request for Quota Single Stage - One E IDA / 62450 apacity for resilient urban go Post Limited 11,000.00 7,688.32 Signed 2020-05-05 2020-04-28 2020-06-23 2020-07-09 2020-06-28 ation de voitures pour la Com tions nvelope vernance mune Urbaine d'Antananariv o MG-M2PATE-190009-NC-RFB Strenghtening institutional c / 2116/Service de Dématérial Single Stage - One E Under Imple IDA / 62450 apacity for resilient urban go Post Request for Bids Limited 88,263.00 0.00 2020-09-07 2021-11-08 2020-09-12 2021-11-12 2020-10-24 2021-12-03 2020-11-23 2020-12-28 2021-06-26 isation des Certificats de situ nvelope mentation vernance ation juridiques de TANA Vill e MG-M2PATE-190027-NC-RFQ Improving urban drainage, s / 1331/Contractualisation ave Request for Quota Single Stage - One E Pending Impl IDA / 62450 ervices and resilience in targ Post Limited 4,166.00 0.00 2020-09-12 2020-11-07 2020-12-31 c l'opérateur de téléphonie m tions nvelope ementation eted areas obile pour mise en place d'un numéro vert MG-M2PATE-190030-NC-RFQ Improving urban drainage, s Request for Quota Single Stage - One E Pending Impl / 1331/Duplication des outils IDA / 62450 ervices and resilience in targ Post Limited 834.00 0.00 2020-09-12 2020-11-07 2020-11-14 tions nvelope ementation de gestion des plaintes eted areas MG-M2PATE-190396-NC-DIR Strenghtening institutional c Pending Impl / 2332/Location de véhicules IDA / 62450 apacity for resilient urban go Post Direct Selection Direct 8,208.33 0.00 2020-09-07 2020-09-12 2020-10-17 2021-01-15 ementation pour la CUA vernance MG-M2PATE-191453-NC-DIR Project Management, Coordi / 3- Location de véhicule mini Pending Impl IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct 2,500.00 0.00 2020-09-07 2020-09-12 2020-10-17 2020-12-16 bus pour l'UGP durant un moi ementation ation s et un mois conditionnel MG-M2PATE-227405-NC-DIR Strenghtening institutional c / 2214 Abonnement d'un an à IDA / 62450 apacity for resilient urban go Post Direct Selection Direct 3,243.00 3,315.83 Signed 2021-04-19 2021-07-09 2021-04-24 2021-07-14 2021-05-16 2021-07-31 2022-05-16 une plateforme de sauvegard vernance e des données (cloud) pour la CUA MG-M2PATE-231773-NC-RFQ Improving urban drainage, s / 1123_ Recrutement d'une A Request for Quota Single Stage - One E IDA / 62450 ervices and resilience in targ Post Limited 15,000.00 1,468.31 Signed 2021-05-15 2021-05-18 2021-07-10 2021-07-27 2021-12-07 gence de paiement pour les i tions nvelope eted areas ndemnisations des PAPs au ni veau des Digues MG-M2PATE-256960-NC-RFQ Strenghtening institutional c / 2.1-Préstation de service po Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Limited 34,000.00 0.00 2021-10-08 2021-11-05 2021-11-08 ur l'organisation de la Journé tions nvelope ementation vernance e Mondiale des Villes (JMV) 2 021 MG-M2PATE-271323-NC-DIR Strenghtening institutional c / 2.1_Prestation de services p Pending Impl IDA / 62450 apacity for resilient urban go Post Direct Selection Direct 12,600.00 0.00 2021-12-30 2022-01-04 2022-02-08 2022-08-07 our la logistique de la Journé ementation vernance e sectoriel urbain Page 7 MG-M2PATE-271326-NC-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / 3_Prestataire pour l'organis IDA / 62450 nation, Monitoring and Evalu Post Open - National 3,500.00 0.00 2022-01-12 2022-03-09 2022-09-05 tions nvelope ementation ation du team-building de la ation DGATE MG-M2PATE-276718-NC-DIR Contingent Emergency Resp / CERC2_Location de tractope IDA / 62450 Post Direct Selection Direct 25,000.00 0.00 Canceled 2022-02-07 2022-02-09 2022-02-15 2022-04-01 onse Component (CERC) lle pour la CUA MG-M2PATE-191465-NC-RFQ / 3-Recrutement d'une Agenc Project Management, Coordi Request for Quota Single Stage - One E e de sécurité pour le gardien IDA / 62450 nation, Monitoring and Evalu Post Limited 16,000.00 0.00 Canceled 2021-03-26 2021-09-22 tions nvelope nage du site du bureau de l'U ation GP à Manakambahiny MG-M2PATE-315025-NC-RFQ Strenghtening institutional c / 2.1_Contribution à des évèn Request for Quota Single Stage - One E Pending Impl IDA / 62450 apacity for resilient urban go Post Limited 50,000.00 0.00 2022-09-20 2022-10-26 2022-11-25 ements urbains : JMV 2022 - tions nvelope ementation vernance appui logistique et communic ation locale MG-M2PATE-315064-NC-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl / 2.2_Organisation d'un team IDA / 62450 apacity for resilient urban go Post Open - National 11,500.00 0.00 2022-09-24 2022-11-19 2022-12-19 tions nvelope ementation building de la CUA vernance MG-M2PATE-315068-NC-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl IDA / 62450 Post Open - National 18,810.00 0.00 2022-09-24 2022-11-19 2022-12-19 / 2.2_Formation DPAT DRF apacity for resilient urban go tions nvelope ementation vernance MG-M2PATE-315072-NC-RFQ Strenghtening institutional c Request for Quota Single Stage - One E Pending Impl IDA / 62450 Post Open - National 37,821.00 0.00 2022-10-01 2022-11-26 2022-12-26 / 2.2_Formation RRH CBGLCC apacity for resilient urban go tions nvelope ementation vernance MG-M2PATE-324286-NC-RFQ Project Management, Coordi Request for Quota Single Stage - One E Pending Impl / 3_Appui logistique et comm IDA / 62450 nation, Monitoring and Evalu Post Open - National 50,000.00 0.00 2022-11-21 2022-12-28 2023-01-27 tions nvelope ementation unication "Semaine du MATS ation F" CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-12833-CS-QCBS / 1.1 Etudes d'urbanisme, de Improving urban drainage, s Quality And Cost- Open - Internationa résorption des quartiers préc IDA / V0550 ervices and resilience in targ Prior 800,000.00 4,161,869.89 Signed 2017-05-03 2017-06-06 2017-05-24 2017-06-08 2017-07-07 2019-08-12 2017-08-04 2019-10-11 2017-09-03 2019-12-24 2017-10-08 2020-06-23 2017-11-12 2020-07-20 2018-11-12 Based Selection l aires et d'ingénierie sur la zo eted areas ne d'intervention cible MG-M2PATE-12509-CS-CQS / Project Management, Coordi Consultant Qualifi 5.8 - Recrutement d'un consu IDA / V0550 nation, Monitoring and Evalu Post Open - National 20,000.00 0.00 Canceled 2017-04-10 2017-04-07 2017-05-01 2017-05-16 2017-06-14 2017-07-14 2017-08-18 2018-02-14 cation Selection ltant comptable ation MG-M2PATE-12854-CS-QCBS / 2.1 Etudes de techniques d' aménagement et de définitio Quality And Cost- Open - Internationa / Prior 300,000.00 0.00 Canceled 2017-04-14 2017-05-05 2017-06-18 2017-07-16 2017-08-15 2017-09-19 2017-10-24 2018-10-24 n des actions prioritaires et D Based Selection l AO des infrastructures d'hydr aulique urbaine (drainage et protection) MG-M2PATE-12840-CS-QCBS / 1.3 Etudes pour l'élaboratio n du Cadre de Gestion Enviro nnementale et Sociale (CGES Quality And Cost- Open - Internationa ), des Plans de Gestion Enviro / Prior 300,000.00 0.00 Canceled 2017-04-14 2017-05-05 2017-06-18 2017-07-16 2017-08-15 2017-09-19 2017-10-24 2018-10-24 Based Selection l nnementale et Sociale (PGES ), du cadre de politique de réi nstallation des Populations (C PR) et les Plans d'Action de R ecasement (PAR) MG-M2PATE-61124-CS-LCS / Project Management, Coordi Least Cost Selecti Sélection d'un cabinet de rec IDA / V0550 nation, Monitoring and Evalu Post Open - National 10,000.00 7,680.93 Signed 2018-04-30 2018-05-03 2018-05-05 2018-05-15 2018-05-14 2018-06-05 2018-06-13 2018-06-15 2018-07-05 2018-06-25 2018-08-22 2018-07-14 2018-08-31 2018-10-27 on rutement des consultants ation MG-M2PATE-61121-CS-QCBS / Etudes APS/APD/DAO (et Co Improving urban drainage, s ntrôle et Surveillance) des tra Quality And Cost- Open - Internationa IDA / V0550 ervices and resilience in targ Post 100,000.00 92,059.33 Signed 2018-04-30 2018-10-30 2018-05-05 2018-07-24 2018-06-25 2018-10-30 2018-07-10 2019-02-25 2018-07-20 2019-02-25 2018-08-13 2019-05-14 2018-09-17 2019-06-14 2018-12-31 vaux d'aménagement, de via Based Selection l eted areas bilisation et de construction s ur les sites de réinstallation d es PAPs (drainage) MG-M2PATE-13246-CS-INDV Project Management, Coordi Quality And Cost- Open - Internationa / 5.3 Audit externe des compt IDA / V0550 nation, Monitoring and Evalu Prior 30,000.00 0.00 Canceled 2017-10-23 2019-01-10 2017-11-13 2017-12-27 2019-03-07 2018-01-24 2019-04-15 2018-02-23 2018-03-30 2018-05-04 2019-05-04 Based Selection l es du la préparation du projet ation MG-M2PATE-74757-CS-QCBS Improving urban drainage, s / Maîtrise d'œuvre institution Quality And Cost- Open - Internationa IDA / 62450 ervices and resilience in targ Post 775,000.00 471,549.03 Signed 2018-08-21 2018-10-29 2018-08-31 2018-10-05 2019-03-11 2018-11-19 2019-07-01 2018-12-03 2019-07-31 2018-12-19 2019-09-20 2019-01-23 2019-10-14 2022-01-07 nelle et sociale (MOIS) pour l Based Selection l eted areas a mise en œuvre du PAR et d u PGES MG-M2PATE-76352-CS-CQS / Improving urban drainage, s Recrutement d'un opérateur f Consultant Qualifi IDA / 62450 ervices and resilience in targ Post Limited 200,000.00 145,872.87 Signed 2018-08-30 2019-02-05 2018-09-26 2019-03-11 2018-12-10 2019-11-15 2019-01-14 2019-12-09 2020-01-09 oncier (processus administrat cation Selection eted areas if, foncier, CAE, processus de paiement...) MG-M2PATE-103594-CS-QCB Improving urban drainage, s S / Supervision des travaux C Quality And Cost- Open - Internationa IDA / 62450 ervices and resilience in targ Post 802,184.00 0.00 Canceled 2019-03-04 2019-09-09 2019-03-21 2019-05-20 2019-07-03 2019-07-28 2019-08-22 2019-09-19 2021-12-07 3 et digue et du site de dépôt Based Selection l eted areas des boues de curage MG-M2PATE-103604-CS-QCB S / Etudes APD-DAO et missio Improving urban drainage, s Quality And Cost- Open - Internationa Pending Impleme n de supervision des travaux IDA / 62450 ervices and resilience in targ Post 800,000.00 0.00 2019-03-06 2019-03-30 2019-05-26 2019-06-24 2019-07-16 2019-08-05 2019-08-28 2020-10-19 Based Selection l ntation : Augmentation de la capacit eted areas é de pompage et aménagem ents connexes MG-M2PATE-103618-CS-QCB Improving urban drainage, s S / Préparation des instrumen Quality And Cost- Open - Internationa Pending Impleme IDA / 62450 ervices and resilience in targ Post 330,000.00 0.00 2019-08-15 2019-09-08 2019-11-04 2019-12-04 2019-12-25 2020-01-14 2020-02-06 2020-07-05 ts de sauvegarde : EIES et PA Based Selection l ntation eted areas R de la Composante Urbaine MG-M2PATE-117965-CS-QCB Project Management, Coordi S / Recrutement d'un vérifica Quality And Cost- Under Implement IDA / 62450 nation, Monitoring and Evalu Post Open - National 90,000.00 0.00 2019-07-26 2019-08-27 2019-08-16 2020-03-27 2019-09-05 2019-10-05 2019-10-20 2019-11-13 2019-12-02 2021-12-31 teur indépendant du paieme Based Selection ation ation nt des indemnités de compen sation MG-M2PATE-126094-CS-QCB Improving urban drainage, s Quality And Cost- Under Implement S / Evaluation des situations IDA / 62450 ervices and resilience in targ Post Open - National 13,888.89 0.00 2019-08-05 2021-04-19 2019-08-20 2019-09-09 2019-10-09 2019-10-24 2019-11-24 2019-12-13 2020-03-12 Based Selection ation de référence eted areas Page 8 MG-M2PATE-126095-CS-QCB Project Management, Coordi Quality And Cost- S / Recrutement d'une agenc IDA / 62450 nation, Monitoring and Evalu Post Open - National 74,000.00 546,538.37 Signed 2019-08-06 2020-03-18 2019-08-27 2019-09-16 2020-05-01 2019-10-16 2020-08-31 2019-10-31 2020-09-11 2019-12-01 2020-09-28 2019-12-20 2021-01-16 2023-02-12 Based Selection e en communication ation MG-M2PATE-126096-CS-LCS Project Management, Coordi Least Cost Selecti Under Implement / Recrutement auditeur exter IDA / 62450 nation, Monitoring and Evalu Post Open - National 50,000.00 0.00 2019-09-09 2019-09-30 2019-10-20 2019-11-19 2019-12-04 2020-01-04 2020-01-23 2021-06-06 on ation ne pour les comptes 2019 et ation 2020 MG-M2PATE-130235-CS-QCB Project Management, Coordi Quality And Cost- Open - Internationa S / Audit externe des compte IDA / V0550 nation, Monitoring and Evalu Post 30,000.00 6,947.99 Signed 2019-09-09 2018-10-23 2019-09-10 2019-09-12 2019-03-14 2019-09-13 2019-04-12 2019-09-13 2019-05-07 2019-10-13 2019-07-01 2019-10-13 2019-08-01 2019-10-14 Based Selection l s du la préparation du projet ation MG-M2PATE-154184-CS-QCB Improving urban drainage, s S / Supervision des travaux C Quality And Cost- Open - Internationa IDA / 62450 ervices and resilience in targ Prior 1,500,000.00 1,585,611.64 Signed 2020-01-20 2020-06-11 2020-02-03 2020-06-19 2020-04-03 2020-10-01 2020-05-04 2020-12-10 2020-06-04 2021-01-07 2020-07-09 2021-03-19 2020-08-01 2021-04-09 2023-03-19 3 et digues et du site de dép Based Selection l eted areas ôt des boues de curage MG-M2PATE-174538-CS-QCB Strenghtening institutional c S / 2241/20 Réalisation d'un Quality And Cost- IDA / 62450 apacity for resilient urban go Post Open - National 55,556.00 58,876.56 Signed 2020-05-25 2020-07-07 2020-06-04 2020-07-21 2020-06-29 2020-08-31 2020-07-29 2020-09-09 2020-08-03 2020-09-18 2020-08-21 2020-11-24 2020-09-08 2021-05-27 2020-12-07 diagnostic et amélioration de Based Selection vernance la gestion des ressources hu maines de la CUA MG-M2PATE-175044-CS-QCB S / Recrutement d'un consult Strenghtening institutional c ant pour l'assistance techniq Quality And Cost- Under Implement IDA / 62450 apacity for resilient urban go Post Open - National 9,700.00 0.00 2020-06-15 2020-07-08 2020-06-25 2020-07-28 2020-07-20 2020-08-19 2020-09-02 2020-09-26 2020-10-16 2020-12-30 ue à l'élaboration de plan d'e Based Selection ation vernance ntretien de l'ensemble du rés eau de drainage dans la Com mune urbaine d'Antananarivo MG-M2PATE-189948-CS-QCB S / 1311/20- Recrutement d' Improving urban drainage, s Quality And Cost- Under Implement une firme pour Assistance te IDA / 62450 ervices and resilience in targ Post Open - National 15,834.00 0.00 2020-09-07 2021-04-20 2020-09-22 2020-10-26 2020-11-23 2020-12-23 2021-01-27 2021-03-03 2022-03-03 Based Selection ation chnique et appui aux SLC da eted areas ns les communes périphériqu es MG-M2PATE-189950-CS-QCB S / 2.3- Recrutement d'une fir Strenghtening institutional c Quality And Cost- Open - Internationa Under Implement me pour l'élaboration du Sch IDA / 62450 apacity for resilient urban go Prior 1,500,000.00 0.00 2020-09-28 2020-11-03 2020-10-19 2020-11-24 2020-12-02 2021-12-01 2020-12-30 2022-02-11 2021-01-29 2022-04-01 2021-03-05 2022-09-06 2021-04-09 2022-07-03 Based Selection l ation éma Directeur d'alimentation vernance en Eau potable du Grand Ant ananarivo MG-M2PATE-190034-CS-CQS Improving urban drainage, s / 1312/Recrutement d'une fir Consultant Qualifi Under Implement IDA / 62450 ervices and resilience in targ Post Open - National 19,489.00 0.00 2020-09-07 2021-04-20 2020-09-28 2020-11-11 2020-12-11 2021-01-15 2022-01-15 me pour la mise en place des cation Selection ation eted areas SLC de la CUA MG-M2PATE-204100-CS-LCS / 2215/20_A1- Recrutement d Strenghtening institutional c Least Cost Selecti 'une firme pour la collecte et IDA / 62450 apacity for resilient urban go Post Open - National 370,000.00 283,624.01 Signed 2020-12-10 2020-10-28 2020-12-12 2021-01-08 2021-01-04 2021-02-05 2021-02-11 2021-03-08 2021-05-18 2021-03-22 2021-06-03 2021-04-21 2021-06-29 2021-06-20 on la saisie des données de rece vernance nsement : 1ier Arrondisseme nt de la CUA MG-M2PATE-204107-CS-LCS / 2215/20_ A2- Recrutement Strenghtening institutional c Least Cost Selecti d'une firme pour la collecte e IDA / 62450 apacity for resilient urban go Post Open - National 336,500.00 226,601.60 Signed 2020-12-10 2020-10-28 2020-12-12 2021-01-08 2021-01-04 2021-02-05 2021-02-11 2021-03-08 2021-05-18 2021-03-22 2021-06-03 2021-04-21 2021-06-29 2021-06-20 on t la saisie des données de rec vernance ensement : 2ème Arrondisse ment de la CUA MG-M2PATE-204109-CS-LCS / 2215/20_A3- Recrutement d Strenghtening institutional c Least Cost Selecti 'une firme pour la collecte et IDA / 62450 apacity for resilient urban go Post Open - National 204,000.00 255,956.06 Signed 2020-12-10 2020-10-28 2020-12-12 2021-01-08 2021-01-04 2021-02-05 2021-02-11 2021-03-08 2021-05-18 2021-03-22 2021-06-03 2021-04-21 2021-06-29 2021-06-20 on la saisie des données de rece vernance nsement : 3ème Arrondissem ent de la CUA MG-M2PATE-204114-CS-LCS / 2215/20_A4- Recrutement d Strenghtening institutional c Least Cost Selecti 'une firme pour la collecte et IDA / 62450 apacity for resilient urban go Post Open - National 462,000.00 406,973.20 Signed 2020-12-10 2020-10-28 2020-12-12 2021-01-08 2021-01-04 2021-02-05 2021-02-11 2021-03-08 2021-05-18 2021-03-22 2021-06-03 2021-04-21 2021-06-29 2021-06-20 on la saisie des données de rece vernance nsement : 4ème Arrondissem ent de la CUA MG-M2PATE-204116-CS-LCS / 2215/20_A6- Recrutement d Strenghtening institutional c Least Cost Selecti 'une firme pour la collecte et IDA / 62450 apacity for resilient urban go Post Open - National 227,500.00 316,225.45 Signed 2020-12-10 2020-10-28 2020-12-12 2021-01-08 2021-01-04 2021-02-05 2021-02-11 2021-03-08 2021-05-18 2021-03-22 2021-06-03 2021-04-21 2021-06-29 2021-06-20 on la saisie des données de rece vernance nsement : 6ème Arrondissem ent de la CUA MG-M2PATE-224440-CS-QCB S / Accompagnement des bé néficiaires dans la mise en œ uvre de la gestion communa Improving urban drainage, s utaire du volet Quick-Win dan Quality And Cost- Open - Internationa IDA / 62450 ervices and resilience in targ Post 291,026.00 232,025.86 Signed 2021-04-26 2021-06-17 2021-04-30 2021-07-12 2021-06-24 2021-12-01 2021-07-24 2022-01-17 2021-08-23 2022-02-15 2021-09-09 2022-03-21 2021-09-26 2022-05-31 2023-02-18 s les Communes de Bemasoa Based Selection l eted areas ndro, d’Anosizato Ouest, d’An dranonahoatra, d’Ampitatafik a, des 1er et 4ème Arrondiss ements de la Commune Urba ine d’Antananar MG-M2PATE-228546-CS-CQS Strenghtening institutional c / 2.1.5 Elaboration du schém Consultant Qualifi IDA / 62450 apacity for resilient urban go Post Open - National 81,000.00 77,999.06 Signed 2021-04-19 2021-04-25 2021-05-10 2021-06-21 2021-07-05 2021-07-12 2021-08-02 2021-08-02 2021-11-06 2022-05-29 a régional d’aménagement d cation Selection vernance u territoire (SRAT) de la régio n Analamanga MG-M2PATE-231654-CS-CQS / MEAH_ Etudes environneme Improving urban drainage, s ntale et Sociale pour la prépa Consultant Qualifi Open - Internationa IDA / 62450 ervices and resilience in targ Post 100,000.00 38,487.21 Completed 2021-04-30 2021-05-31 2021-05-21 2021-06-04 2021-07-15 2021-06-11 2021-10-04 2021-06-30 2021-10-07 2021-07-30 2022-01-21 ration d'un nouveau projet d' cation Selection l eted areas adduction d'eau du Ministère de l'Eau, de l'Assainissement et de l'Hygiène MG-M2PATE-231769-CS-QCB S / 1341_ Recrutement d'une Improving urban drainage, s ONG pour l'élaboration de pla Quality And Cost- Under Implement IDA / 62450 ervices and resilience in targ Post Open - National 54,000.00 0.00 2021-05-11 2021-05-14 2021-06-01 2021-06-23 2021-07-21 2021-08-04 2021-08-25 2021-09-29 2022-02-26 ns de réduction des risques e Based Selection ation eted areas t catastrophes pour la CUA et les Fokontany des Commune s périphériques MG-M2PATE-231774-CS-CQS / Mission d’études, de contrôl Improving urban drainage, s e et surveillance des travaux Consultant Qualifi Pending Impleme IDA / 62450 ervices and resilience in targ Post Limited 37,436.00 0.00 2021-05-10 2021-05-14 2021-07-28 2021-08-18 2022-07-14 de réfection de la piste de de cation Selection ntation eted areas sserte à Ambatomainty – Iari narivo-Ambatomitsangana - District d’Ambohidratrimo MG-M2PATE-235430-CS-LCS / CERC-CUA_ Recrutement d' Contingent Emergency Resp Least Cost Selecti IDA / 62450 Post Open - National 160,000.00 133,305.32 Completed 2021-05-23 2021-07-01 2021-06-13 2021-07-18 2021-07-13 2021-08-07 2021-07-26 2021-08-27 2021-07-28 2021-09-13 2021-08-02 2021-10-18 2021-08-14 2022-07-15 2022-01-01 une firme pour études, contr onse Component (CERC) on ôle et surveillance des travau x Page 9 MG-M2PATE-243916-CS-LCS / 3_Recrutement d'une firme Project Management, Coordi Least Cost Selecti Under Implement pour le Diagnostic des arrang IDA / 62450 nation, Monitoring and Evalu Post Open - National 30,000.00 0.00 2021-07-26 2021-07-19 2021-08-09 2021-09-20 2021-10-18 2021-11-08 2021-11-22 2021-12-13 2022-01-22 on ation ements institutionnels de la ation mise en œuvre du projet PRO DUIR MG-M2PATE-252583-CS-QCB S / 2.1 Recrutement d'une fir Strenghtening institutional c Quality And Cost- Under Implement me pour élaborer la stratégie IDA / 62450 apacity for resilient urban go Post Open - National 500,000.00 0.00 2021-10-30 2021-09-22 2021-11-20 2021-10-13 2022-01-03 2022-01-31 2022-03-02 2022-04-06 2022-05-11 2023-05-11 Based Selection ation de développement pour la re vernance structuration des quartiers pr écaires MG-M2PATE-285493-CS-CQS Improving urban drainage, s / 2.3_ Recrutement d'une fir Consultant Qualifi Under Implement IDA / 62450 ervices and resilience in targ Post Open - National 125,000.00 0.00 2022-03-28 2022-04-09 2022-04-18 2022-06-01 2022-07-01 2022-08-05 2022-11-03 me pour l'élaboration d'un pl cation Selection ation eted areas an d'entretien des canaux et digues à Antananarivo MG-M2PATE-299937-CS-LCS Project Management, Coordi Least Cost Selecti Under Implement / 3.1_Audit externe CERC et P IDA / 62450 nation, Monitoring and Evalu Post Open - National 32,500.00 0.00 2022-07-01 2022-07-20 2022-07-22 2022-09-04 2022-10-02 2022-11-01 2022-12-06 2023-01-10 2023-04-10 on ation RODUIR 2022 et clôtures ation MG-M2PATE-301662-CS-QCB Strenghtening institutional c S / 2.3_Etude de capitalisatio Quality And Cost- Under Implement IDA / 62450 apacity for resilient urban go Post Open - National 350,000.00 0.00 2022-08-01 2022-07-20 2022-08-22 2022-10-05 2022-11-02 2022-12-02 2023-01-06 2023-02-10 2023-10-08 n et d’appui à la mise en œu Based Selection ation vernance vre d’une stratégie de gestio n de déchets solides MG-M2PATE-309197-CS-QCB S / Etudes de révision de la g Improving urban drainage, s Quality And Cost- Pending Impleme estion des boues de curage e IDA / 62450 ervices and resilience in targ Post Open - National 400,000.00 0.00 2022-08-18 2022-08-18 2022-08-25 2022-09-27 2022-10-25 2022-11-23 2022-12-23 2023-05-22 Based Selection ntation t de l’aménagement du site d eted areas e confinement des boues à Ia rinarivo MG-M2PATE-315031-CS-CQS Strenghtening institutional c Consultant Qualifi Pending Impleme / 2.1_Campagne de communi IDA / 62450 apacity for resilient urban go Post Open - National 15,000.00 0.00 2022-10-03 2022-10-24 2022-12-07 2023-01-06 2023-02-10 2023-05-11 cation Selection ntation cation des activités pour MAT vernance AC MG-M2PATE-315065-CS-IND V / 2.2_Recrutement d'un pre Strenghtening institutional c Consultant Qualifi Pending Impleme stataire pour la conception et IDA / 62450 apacity for resilient urban go Post Limited 94,000.00 0.00 2022-09-19 2022-10-03 2022-11-02 2022-12-07 2023-03-07 cation Selection ntation l'installation du réseau d'inter vernance connexion des sites de la CU A MG-M2PATE-315067-CS-CQS Strenghtening institutional c / 2.2_Mise en place d'une plat Consultant Qualifi Pending Impleme IDA / 62450 apacity for resilient urban go Post Limited 75,241.00 0.00 2022-09-19 2022-10-03 2022-11-02 2022-12-07 2023-03-07 eforme numérique de suivi et cation Selection ntation vernance de paiement des impôts et ta xes de la CUA INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MG-M2PATE-11285-CS-CDS / Project Management, Coordi 5.4 Convention de Maîtrise d' IDA / V0550 nation, Monitoring and Evalu Prior Direct Selection Direct 200,000.00 261,209.80 Signed 2017-03-30 2017-04-09 2017-04-10 2017-06-13 2017-04-14 2017-12-10 Ouvrage Délégué CMOD AGE ation TIPA / M2PATE MG-M2PATE-13242-CS-INDV Project Management, Coordi Individual Consult / 5.1 Elaboration d'un manuel IDA / V0550 nation, Monitoring and Evalu Prior Open 25,000.00 24,324.80 Signed 2017-04-20 2018-05-04 2017-06-08 2018-06-01 2017-06-29 2018-07-25 2017-08-03 2018-08-03 2018-01-30 ant Selection de procédures ation MG-M2PATE-14572-CS-INDV / 1.3 Etudes pour l'élaboratio Improving urban drainage, s n du Cadre de Gestion Enviro Individual Consult IDA / V0550 ervices and resilience in targ Prior Limited 30,000.00 51,200.00 Signed 2017-05-16 2017-06-30 2017-05-16 2017-06-30 2017-06-06 2017-09-06 2017-06-12 2017-09-13 2017-07-12 nnementale et Sociale (CGES ant Selection eted areas ) et du cadre de politique de réinstallation des Populations (CPR) MG-M2PATE-15100-CS-CDS / Etudes techniques de remise en état des infrastructures de drainage et de protection con Improving urban drainage, s tre les inondations : (i) Etude IDA / V0550 ervices and resilience in targ Prior Direct Selection Direct 500,000.00 1,034,178.16 Signed 2017-05-16 2017-08-24 2017-05-18 2017-08-29 2017-06-01 2017-10-13 2017-09-29 s APS/APD/DAO, (ii) Etudes d' eted areas Impacts Environnemental et Social (EIES), (iii) Elaboration du Plan de Gestion Environne mentale et Soc MG-M2PATE-13072-CS-CQS / Project Management, Coordi Individual Consult 5.6 Recrutement d'un assista IDA / V0550 nation, Monitoring and Evalu Post Open 20,000.00 0.00 Canceled 2017-04-19 2017-05-03 2017-06-07 2017-06-28 2017-08-02 2018-01-29 ant Selection nt technique ation MG-M2PATE-12506-CS-CQS / Project Management, Coordi Individual Consult 5.5 - Recrutement du Coordin IDA / V0550 nation, Monitoring and Evalu Post Open 40,000.00 0.00 Canceled 2017-04-19 2017-04-05 2017-06-07 2017-06-28 2017-08-02 2018-01-29 ant Selection ateur de Projet ation MG-M2PATE-12508-CS-CQS / Project Management, Coordi Individual Consult 5.7 - Recrutement de Respon IDA / V0550 nation, Monitoring and Evalu Post Open 20,000.00 0.00 Canceled 2017-04-19 2018-09-13 2017-06-07 2017-06-28 2017-08-02 2018-01-29 ant Selection sable Administratif et Financi ation er MG-M2PATE-35795-CS-INDV Project Management, Coordi Individual Consult / Recrutement du Coordonnat IDA / V0550 nation, Monitoring and Evalu Post Open 40,000.00 24,679.30 Signed 2017-11-23 2018-09-17 2017-12-15 2019-01-10 2017-12-20 2018-12-13 2018-01-24 2019-01-04 2019-01-19 ant Selection eur de Projet ation MG-M2PATE-35794-CS-INDV Project Management, Coordi Individual Consult IDA / V0550 Post Open 20,000.00 19,198.65 Completed 2017-11-23 2018-02-16 2017-12-15 2017-12-20 2018-03-01 2018-01-24 2018-03-12 2019-01-19 2019-04-30 / Recrutement d'un Assistant nation, Monitoring and Evalu ant Selection Technique ation MG-M2PATE-35788-CS-CQS / Project Management, Coordi Individual Consult Recrutement d'un consultant IDA / V0550 nation, Monitoring and Evalu Post Open 20,000.00 12,017.04 Signed 2017-11-23 2018-02-09 2017-12-15 2017-12-20 2018-04-26 2018-01-24 2018-05-01 2019-01-19 ant Selection comptable ation MG-M2PATE-35792-CS-INDV Project Management, Coordi Individual Consult / Recrutement d'un consultan IDA / V0550 nation, Monitoring and Evalu Post Open 20,000.00 15,589.80 Signed 2017-11-23 2018-09-13 2017-12-15 2018-12-10 2017-12-20 2018-12-13 2018-01-24 2019-01-04 2019-01-19 ant Selection t Responsable Administratif e ation t financier MG-M2PATE-61122-CS-INDV Improving urban drainage, s / Etudes d'identification et de Individual Consult IDA / V0550 ervices and resilience in targ Post Limited 20,000.00 13,427.61 Signed 2018-04-30 2018-06-25 2018-05-05 2018-06-28 2018-05-26 2018-11-23 2018-06-30 2019-01-14 2018-08-29 présélection des sites de dép ant Selection eted areas ôt de boue de curage MG-M2PATE-61123-CS-INDV / Recrutement d'un consultan Strenghtening institutional c Individual Consult t pour l'identification des trav IDA / V0550 apacity for resilient urban go Post Direct 6,500.00 6,496.35 Signed 2018-04-30 2018-07-24 2018-05-10 2018-11-07 2018-05-31 2018-12-10 2018-07-05 2019-01-14 2018-09-03 ant Selection aux d'interventions facilemen vernance t à exécuter (Travaux Quick Win) Page 10 MG-M2PATE-61125-CS-CDS / Project Management, Coordi Recrutement d'un consultant IDA / V0550 nation, Monitoring and Evalu Post Direct Selection Direct 25,000.00 39,897.67 Signed 2018-04-30 2018-06-14 2018-05-10 2018-06-18 2018-06-19 2018-07-10 2018-08-18 pour l'élaboration d'un Plan d ation e communication + Mise en œuvre 3 mois MG-M2PATE-61116-CS-CDS / Etude de qualification et d'a ménagement d'un site altern Improving urban drainage, s atif pour accueillir les produit IDA / V0550 ervices and resilience in targ Post Direct Selection Direct 200,000.00 0.00 Canceled 2018-04-30 2018-08-03 2018-05-10 2018-07-05 2018-10-03 s de curage issus des canaux eted areas de drainage et du bassin de l aminage au niveau de l'agglo mération d'Antananarivo MG-M2PATE-61120-CS-CDS / Mission de consultance (i) po ur l'Evaluation des EIES et du Improving urban drainage, s PAR des travaux de remise e IDA / V0550 ervices and resilience in targ Post Direct Selection Direct 100,000.00 94,064.17 Signed 2018-05-07 2018-08-30 2018-05-17 2018-08-07 2018-07-21 2018-10-05 2018-11-18 n état des infrastructures de eted areas drainage et (ii) pour la réalisa tion des EIES et du PAR du sit e de confinement des des bo ues de curage et du site de r éinstallation MG-M2PATE-69639-CS-CDS / Maîtrise d'œuvre relative à l' Extension du Schéma Directe Improving urban drainage, s ur d'Assainissement d'Antana IDA / 62450 ervices and resilience in targ Post Direct Selection Direct 330,000.00 959,419.64 Signed 2018-07-18 2018-07-30 2018-07-25 2018-08-05 2018-11-09 2019-06-01 narivo et la modélisation du r eted areas isque d'inondation au niveau de l'agglomération - Tranche conditionnelle Lot 2 MG-M2PATE-69644-CS-INDV Project Management, Coordi Individual Consult / Panel - Expert en sauvegard IDA / 62450 nation, Monitoring and Evalu Post Open 50,000.00 183,150.00 Signed 2018-07-13 2018-08-22 2018-08-15 2018-11-14 2018-08-26 2018-12-10 2018-08-31 2019-01-09 2020-04-22 ant Selection es environnementales ation MG-M2PATE-69648-CS-INDV Project Management, Coordi Individual Consult / Panel - Expert en sauvegard IDA / 62450 nation, Monitoring and Evalu Post Open 50,000.00 158,070.00 Signed 2018-07-13 2018-08-22 2018-08-15 2018-11-14 2018-08-26 2018-12-10 2018-08-31 2019-01-07 2020-04-22 ant Selection es sociales ation MG-M2PATE-69649-CS-INDV Project Management, Coordi Individual Consult / Panel - Spécialiste Infrastruc IDA / V0550 nation, Monitoring and Evalu Post Open 50,000.00 144,350.00 Signed 2018-07-13 2018-08-22 2018-08-15 2018-11-14 2018-08-26 2018-12-10 2018-08-31 2019-01-07 2020-04-22 ant Selection tures / Génie Civil ation MG-M2PATE-69651-CS-INDV Project Management, Coordi Individual Consult / UGP - Expert en sauvegarde IDA / V0550 nation, Monitoring and Evalu Post Open 3,000.00 13,025.18 Signed 2018-07-30 2018-09-13 2018-09-05 2018-12-10 2018-09-08 2018-12-13 2018-09-11 2019-01-04 2018-12-10 ant Selection s environnementales ation MG-M2PATE-69686-CS-INDV Project Management, Coordi Individual Consult IDA / V0550 Post Open 3,000.00 10,625.81 Signed 2018-07-30 2018-09-07 2018-09-05 2018-12-10 2018-09-08 2018-12-13 2018-09-11 2019-01-04 2018-12-10 / UGP - Expert en sauvegarde nation, Monitoring and Evalu ant Selection s sociales ation MG-M2PATE-69687-CS-INDV Project Management, Coordi Individual Consult / UGP - Assistant technique e IDA / V0550 nation, Monitoring and Evalu Post Open 3,000.00 9,571.87 Signed 2018-07-30 2018-09-07 2018-09-05 2018-12-14 2018-09-08 2018-12-18 2018-09-11 2019-01-04 2018-12-10 ant Selection n passation de marchés ation MG-M2PATE-69688-CS-INDV Project Management, Coordi Individual Consult Under Implement IDA / V0550 Post Open 3,000.00 0.00 2018-07-30 2018-09-07 2018-09-05 2019-05-13 2018-09-08 2019-08-20 2018-09-11 2018-12-10 / UGP - Audit interne nation, Monitoring and Evalu ant Selection ation ation MG-M2PATE-69689-CS-INDV Project Management, Coordi Individual Consult / UGP - Assistant technique A IDA / V0550 nation, Monitoring and Evalu Post Open 3,000.00 10,625.81 Signed 2018-07-30 2018-09-13 2018-09-05 2018-12-10 2018-09-08 2018-12-14 2018-09-11 2019-01-04 2018-12-10 ant Selection ssainissement ation MG-M2PATE-76341-CS-INDV Project Management, Coordi Individual Consult IDA / V0550 Post Open 3,000.00 10,666.60 Terminated 2018-08-30 2018-09-07 2018-10-10 2018-12-14 2018-10-15 2018-12-18 2018-10-18 2019-01-04 2018-12-31 2019-01-31 / UGP Spécialiste en Suivi-év nation, Monitoring and Evalu ant Selection aluation ation MG-M2PATE-102967-CS-CDS Project Management, Coordi / Convention de Maîtrise d'Ou IDA / 62450 nation, Monitoring and Evalu Prior Direct Selection Direct 3,136,000.00 2,581,275.59 Signed 2019-02-26 2019-03-18 2019-02-28 2019-03-21 2019-03-07 2019-03-30 2024-02-09 vrage Délégué (CMOD) de mi ation se en œuvre AGETIPA / MAHT P MG-M2PATE-102990-CS-IND Project Management, Coordi Individual Consult V / Assistant Technique de l'U IDA / 62450 nation, Monitoring and Evalu Post Open 20,000.00 2,864.10 Signed 2019-03-04 2019-03-15 2019-04-23 2019-07-18 2019-04-28 2019-09-03 2019-05-02 2019-09-17 2019-10-29 ant Selection nité d'Exécution du Projet à l ation a CUA MG-M2PATE-102993-CS-IND Project Management, Coordi Individual Consult V / UGP - Spécialiste Suivi-év IDA / 62450 nation, Monitoring and Evalu Post Open 20,000.00 10,772.62 Completed 2019-03-04 2018-09-07 2019-04-23 2019-02-19 2019-04-28 2019-02-22 2019-05-02 2019-02-27 2019-10-29 2019-04-05 ant Selection aluation 2 ation MG-M2PATE-103613-CS-IND Improving urban drainage, s V / Etudes de sauvegardes (E Individual Consult Pending Impleme IDA / 62450 ervices and resilience in targ Post Open 90,000.00 0.00 2019-03-06 2019-05-08 2019-05-13 2019-06-03 2019-09-01 IES/PAR) pour la station de p ant Selection ntation eted areas ompage et aménagements c onnexes MG-M2PATE-117956-CS-IND Project Management, Coordi Individual Consult Under Implement V / Recrutement d'un Spéciali IDA / 62450 nation, Monitoring and Evalu Post Open 15,000.00 0.00 2019-06-04 2019-05-09 2019-07-08 2019-07-23 2019-08-11 2020-08-11 ant Selection ation ste en Suivi Evaluation 3 aup ation rès de l'UGP MG-M2PATE-117960-CS-IND Project Management, Coordi Individual Consult V / Recrutement d'un Assista IDA / 62450 nation, Monitoring and Evalu Post Open 15,000.00 4,628.05 Signed 2019-06-04 2019-05-09 2019-07-08 2019-06-25 2019-07-23 2019-06-28 2019-08-11 2019-07-11 2020-08-11 ant Selection nt Technique en Urbanisme 2 ation auprès de l'UGP MG-M2PATE-118706-CS-IND Project Management, Coordi Individual Consult Under Implement IDA / 62450 Post Open 15,000.00 0.00 2019-06-17 2019-09-05 2019-08-05 2019-08-26 2019-09-30 2020-09-29 V / Assistant Administratif et nation, Monitoring and Evalu ant Selection ation Logistique ation MG-M2PATE-118652-CS-IND Project Management, Coordi Individual Consult V / Responsable Communicat IDA / 62450 nation, Monitoring and Evalu Post Open 20,000.00 0.00 Canceled 2019-06-17 2019-08-05 2019-08-26 2019-09-30 2020-09-29 ant Selection ion au sein de l'UGP ation MG-M2PATE-13245-CS-INDV Project Management, Coordi Individual Consult / 5.2 Recrutement d'un Cons IDA / V0550 nation, Monitoring and Evalu Prior Open 20,000.00 0.00 Canceled 2017-04-20 2017-06-08 2017-06-29 2017-08-03 2018-01-30 ant Selection ultant pour l'analyse économi ation que du projet MG-M2PATE-13238-CS-INDV Strenghtening institutional c / 3.1 Audit Organisationnel et Individual Consult IDA / V0550 apacity for resilient urban go Prior Open 30,000.00 0.00 Canceled 2017-04-20 2017-06-08 2017-06-29 2017-08-03 2018-01-30 Institutionnel de la Commune ant Selection vernance Urbaine d'Antananarivo MG-M2PATE-118679-CS-IND Project Management, Coordi Individual Consult IDA / 62450 Post Open 20,000.00 0.00 Canceled 2019-06-17 2019-08-05 2019-08-26 2019-09-30 2020-09-29 V / Conseiller Juridique au sei nation, Monitoring and Evalu ant Selection n de l'UGP ation MG-MAHTP-132960-CS-INDV Project Management, Coordi Individual Consult Pending Impleme / Recrutement d'un coordonn IDA / 62450 nation, Monitoring and Evalu Post Open 40,000.00 0.00 2019-09-11 2019-10-30 2019-11-04 2019-11-23 2020-11-23 ant Selection ntation ateur au sein l'UGP PRODUIR ation Page 11 MG-MAHTP-132965-CS-INDV Project Management, Coordi / Recrutement d'un Assistant Individual Consult Under Implement IDA / 62450 nation, Monitoring and Evalu Post Open 15,000.00 0.00 2019-09-11 2019-01-11 2019-10-30 2019-11-04 2019-11-23 2020-05-21 Technique en Passation de M ant Selection ation ation archés au sein de l'UGP PRO DUIR MG-MAHTP-132966-CS-INDV Strenghtening institutional c / Recrutement d'un Consulta Individual Consult Under Implement IDA / 62450 apacity for resilient urban go Post Open 16,660.00 0.00 2019-09-11 2019-09-25 2019-09-21 2019-09-26 2019-10-15 2019-12-14 nt pour appui à l'organisation ant Selection ation vernance de la table ronde des acteurs urbains. MG-M2PATE-175057-CS-IND V / Recrutement d'un Consult Strenghtening institutional c Individual Consult Under Implement ant WASH pour assistance te IDA / 62450 apacity for resilient urban go Post Open 3,500.00 0.00 2020-06-15 2020-07-22 2020-08-03 2020-08-24 2020-09-10 2020-12-09 ant Selection ation chnique à la CUA dans la pré- vernance collecte des déchets solides MG-M2PATE-175063-CS-IND V / Recrutement d'un Consult Strenghtening institutional c ant Socio-Economiste pour as Individual Consult Under Implement IDA / 62450 apacity for resilient urban go Post Open 3,500.00 0.00 2020-06-15 2020-07-22 2020-08-03 2020-08-24 2020-09-10 2020-12-09 sistance technique à la Com ant Selection ation vernance mune urbaine d'Antananarivo dans la pré-collecte des déch ets solides MG-M2PATE-175066-CS-IND V / Recrutement d'un Spéciali Strenghtening institutional c ste en Communication pour a Individual Consult Under Implement IDA / 62450 apacity for resilient urban go Post Open 3,900.00 0.00 2020-06-15 2020-07-22 2020-08-03 2020-08-24 2020-09-10 2020-12-09 ssistance technique à la CUA ant Selection ation vernance dans la pré-collecte des déch ets solides et l'IEC des popula tions MG-M2PATE-174534-CS-SCI / Strenghtening institutional c 2231/20 Réalisation d'un dia Individual Consult Under Implement IDA / 62450 apacity for resilient urban go Post Open 44,445.00 0.00 2020-06-29 2020-07-08 2020-08-07 2020-08-22 2020-09-11 2020-12-10 gnostic et amélioration des s ant Selection ation vernance ystèmes d'information de la CUA MG-M2PATE-190036-CS-IND V / 1313/Recrutement d'un c Improving urban drainage, s Individual Consult Under Implement onsultant individuel pour l'éla IDA / 62450 ervices and resilience in targ Post Open 7,555.00 0.00 2020-09-07 2021-04-20 2020-10-26 2020-11-16 2020-12-21 2021-12-21 ant Selection ation boration et la mise en œuvre eted areas de plan d'engagement des p arties prenantes MG-M2PATE-190039-CS-IND V / 1332/Recrutement d'un c Improving urban drainage, s Individual Consult onsultant individuel pour l'ét IDA / 62450 ervices and resilience in targ Post Open 4,167.00 9,072.00 Signed 2020-09-07 2020-09-30 2020-10-26 2021-04-01 2020-11-16 2021-04-12 2020-12-21 2021-05-21 2021-12-21 ant Selection ablissement d'un système de eted areas gestion de base de données ( SGBD) sur le MGP MG-M2PATE-190041-CS-IND V / Recrutement d'un consult ant individuel pour la mise à j Strenghtening institutional c our du plan d'action de la rési Individual Consult IDA / 62450 apacity for resilient urban go Post Open 18,500.00 16,662.38 Signed 2020-09-07 2020-09-30 2020-10-26 2021-03-26 2020-11-16 2021-04-30 2020-12-21 2021-05-22 2021-03-21 lience en vue Séminaire des ant Selection vernance acteurs de la plateforme GIE U en « Emergence et Résilien ce Territoriale du Grand Anta nanarivo » MG-M2PATE-204089-CS-IND Project Management, Coordi Individual Consult Under Implement IDA / 62450 Post Open 32,000.00 0.00 2020-12-10 2020-12-10 2021-01-13 2021-01-18 2021-02-11 2022-02-11 V / 3- Auditeur interne du PR nation, Monitoring and Evalu ant Selection ation ODUIR ation MG-M2PATE-208723-CS-IND V / CERC_ugp_ Recrutement Contingent Emergency Resp Individual Consult Under Implement IDA / 62450 Post Open 13,333.00 0.00 2020-12-14 2021-02-24 2021-02-01 2021-02-22 2021-03-22 2021-09-30 d'un Assistant en passation d onse Component (CERC) ant Selection ation e marchés pour la mise en œ uvre du CERC MG-M2PATE-218497-CS-IND V / CERC_ugp Recrutement d' Contingent Emergency Resp Individual Consult un Consultant individuel pour IDA / 62450 Post Direct 15,000.00 11,366.35 Completed 2021-02-16 2021-03-08 2021-02-26 2021-05-07 2021-03-13 2021-05-17 2021-04-03 2021-06-10 2021-10-04 2021-10-01 onse Component (CERC) ant Selection études environnementales et sociales des infrastructures c ommunautaires MG-M2PATE-219437-CS-CDS Strenghtening institutional c / 2215/21_Acquisition orthop IDA / 62450 apacity for resilient urban go Post Direct Selection Direct 35,270.00 95,251.77 Signed 2021-02-22 2021-04-07 2021-03-04 2021-04-02 2021-03-17 2021-05-20 2021-06-15 hoto et numérisation des bâti vernance s pour le recensement au sei n de la CUA MG-M2PATE-224465-CS-CDS / Mission d’élaboration du Pro gramme d’Engagement Envir Improving urban drainage, s Pending Impleme onnementale (PREE) pour les IDA / 62450 ervices and resilience in targ Post Direct Selection Direct 10,000.00 0.00 2021-04-26 2021-04-30 2021-06-09 2021-08-08 ntation travaux de réfection de la pis eted areas te de desserte à Ambatomain ty – Iarinarivo-Ambatomitsan gana - District d’Ambohidratri mo MG-M2PATE-227407-CS-IND V / 2231 Recrutement d'un c Strenghtening institutional c Individual Consult Pending Impleme onsultant pour la conception IDA / 62450 apacity for resilient urban go Post Open 27,027.00 0.00 2021-04-19 2021-06-07 2021-06-28 2021-07-26 2022-01-22 ant Selection ntation du réseau d'interconnexion d vernance es sites administratifs de la C UA MG-M2PATE-228542-CS-IND Strenghtening institutional c V / 2129- Recrutement d'un c Individual Consult IDA / 62450 apacity for resilient urban go Post Direct 8,000.00 7,408.62 Signed 2021-04-19 2021-04-26 2021-04-22 2021-05-05 2021-05-07 2021-06-01 2021-05-10 2021-07-13 2021-08-09 onsultant pour l'appui d'aide ant Selection vernance à la décision MATP-système I VO MG-M2PATE-235439-CS-CDS / 2.1_Recrutement d'un cons Strenghtening institutional c ultant pour la formation tech IDA / 62450 apacity for resilient urban go Post Direct Selection Direct 28,000.00 36,195.65 Completed 2021-05-30 2021-06-01 2021-06-09 2021-06-03 2021-06-30 2021-07-13 2022-01-06 2022-01-13 nique sur la thématique de la vernance restructuration de quartier pr écaires et la conception de pr ojet urbain MG-M2PATE-235868-CS-IND Project Management, Coordi V / 3- Recrutement d'un cons Individual Consult IDA / 62450 nation, Monitoring and Evalu Post Open 17,000.00 16,556.76 Completed 2021-05-31 2021-08-03 2021-06-28 2021-11-10 2021-07-19 2021-12-09 2021-07-28 2021-12-22 2021-11-25 2022-04-22 ultant pour la construction de ant Selection ation maquettes architecturale et urbanisme MG-M2PATE-235869-CS-IND Project Management, Coordi V / 3- Recrutement d'un Resp Individual Consult Pending Impleme IDA / 62450 nation, Monitoring and Evalu Post Open 20,000.00 0.00 2021-05-31 2021-07-03 2021-07-17 2021-08-02 2022-07-28 onsable Administratif et Fina ant Selection ntation ation ncier de l'UGP (n°2) MG-M2PATE-243929-CS-IND Strenghtening institutional c V / 2.2_Recrutement d'un Ass Individual Consult Under Implement IDA / 62450 apacity for resilient urban go Post Open 20,000.00 0.00 2021-07-26 2021-10-21 2021-09-13 2021-10-04 2021-11-08 2022-11-03 istant au Point focal de la Co ant Selection ation vernance mmune Urbaine d'Antananari vo (CUA) Page 12 MG-M2PATE-252576-CS-IND V / 1.3 Recrutement d’un con Improving urban drainage, s Individual Consult Under Implement sultant chargé d’accompagne IDA / 62450 ervices and resilience in targ Post Open 7,900.00 0.00 2021-10-18 2021-11-05 2021-12-06 2021-12-27 2022-01-31 2022-07-30 ant Selection ation ment du projet dans la lutte c eted areas ontre la VBG et VCE MG-M2PATE-256964-CS-IND V / 1.3-Recrutement d'un Assi Improving urban drainage, s stant Technique en charge d' Individual Consult Under Implement IDA / 62450 ervices and resilience in targ Post Open 7,900.00 0.00 2021-10-12 2022-02-17 2021-11-17 2021-11-26 2021-12-20 2022-06-18 appui à la gestion des plainte ant Selection ation eted areas s, de la lutte contre les violen ces basées sur le Genre et de la mobilisation citoyenne MG-M2PATE-268934-CS-IND V / 2.3_Recrutement d'un con Improving urban drainage, s sultant en charge de l'élabor Individual Consult Under Implement IDA / 62450 ervices and resilience in targ Post Open 25,400.00 0.00 2022-01-10 2021-12-17 2022-02-15 2022-03-08 2022-03-25 2022-08-22 ation d'un plan d'entretien de ant Selection ation eted areas s canaux de drainage et de l' étude de faisabilité de filière de valorisation de jacinthe d' eau MG-M2PATE-268935-CS-IND V / 2.3_ Recrutement d'un co Improving urban drainage, s Individual Consult Under Implement nsultant en charge de l'élabo IDA / 62450 ervices and resilience in targ Post Open 15,200.00 0.00 2022-01-10 2021-12-17 2022-02-13 2022-03-06 2022-03-23 2022-08-20 ant Selection ation ration d'un plan d'entretien e eted areas t de surveillance des digues MG-M2PATE-274107-CS-IND Project Management, Coordi Individual Consult Under Implement V / 3. Recrutement d'un Coor IDA / 62450 nation, Monitoring and Evalu Post Open 40,000.00 0.00 2022-01-24 2022-02-24 2022-03-14 2022-03-19 2022-04-12 2023-06-30 ant Selection ation donnateur de Projet ation MG-M2PATE-276698-CS-CDS / CERC2_Recrutement d'un A Contingent Emergency Resp Pending Impleme IDA / 62450 Post Direct Selection Direct 3,000.00 0.00 2022-02-04 2022-02-14 2022-04-20 2022-10-17 ssistant en passation de mar onse Component (CERC) ntation chés pour la mise en œuvre du CERC2 MG-M2PATE-285469-CS-IND Project Management, Coordi Individual Consult Under Implement V / Recrutement d'un Spéciali IDA / 62450 nation, Monitoring and Evalu Post Open 15,000.00 0.00 2022-03-28 2022-04-03 2022-05-16 2022-06-06 2022-07-11 2023-01-07 ant Selection ation ste en Suivi Evaluation 4 aup ation rès de l'UGP MG-M2PATE-285542-CS-IND V / CERC_ugp_Recrutement d Contingent Emergency Resp Individual Consult Under Implement IDA / 62450 Post Limited 13,333.00 0.00 2022-03-28 2022-04-03 2022-04-02 2022-04-23 2022-05-28 2022-11-24 'un Assistant Technique en p onse Component (CERC) ant Selection ation assation de marchés 2 MG-M2PATE-297214-CS-IND V / Mission d’élaboration du P rogramme d’Engagement En vironnemental (PREE) et du P Strenghtening institutional c Individual Consult Under Implement lan de Gestion Environnemen IDA / 62450 apacity for resilient urban go Post Limited 38,462.00 0.00 2022-06-01 2022-01-20 2022-06-08 2022-06-10 2022-06-12 2022-10-10 ant Selection ation tale et Sociale (PGES) des tra vernance vaux d’aménagement de la p iste d’accès, d’élargissement de la digue à Iarinarivo et à l a réalisation des études EIES/ PAR MG-M2PATE-301274-CS-IND Project Management, Coordi Individual Consult Under Implement V / Recrutement d'un Compta IDA / 62450 nation, Monitoring and Evalu Post Open 12,000.00 0.00 2022-07-25 2022-07-20 2022-09-12 2022-10-03 2022-11-07 2023-11-02 ant Selection ation ble pour l'UGP PRODUIR ation MG-M2PATE-301276-CS-IND Project Management, Coordi Individual Consult Pending Impleme V / Recrutement d'un Assista IDA / 62450 nation, Monitoring and Evalu Post Limited 12,000.00 0.00 2022-06-27 2022-07-02 2022-07-23 2022-08-27 2023-08-22 ant Selection ntation nt Technique en Passation de ation marchés MG-M2PATE-301625-CS-IND Project Management, Coordi V / Recrutement d'un Expert Individual Consult Under Implement IDA / 62450 nation, Monitoring and Evalu Post Open 12,000.00 0.00 2022-08-01 2022-07-20 2022-09-19 2022-10-10 2022-11-14 2023-11-09 en Sauvegarde Environneme ant Selection ation ation ntale pour l'UGP PRODUIR MG-M2PATE-228756-CS-IND V / CERC-CUA_ Recrutement Contingent Emergency Resp Individual Consult d'un Consultant individuel po IDA / 62450 Post Direct 600.00 0.00 Canceled 2021-05-10 2021-05-20 2021-06-10 2021-07-08 2021-08-07 onse Component (CERC) ant Selection ur former le personnel de la CUA à la gestion des cadavre s MG-M2PATE-228755-CS-IND V / CERC-CUA_ Recrutement Contingent Emergency Resp Individual Consult d'un Consultant individuel po IDA / 62450 Post Open 50,000.00 0.00 Canceled 2021-04-26 2021-06-05 2021-06-26 2021-07-24 2021-09-22 onse Component (CERC) ant Selection ur le d'un logiciel pour la plat eforme de paiement numériq ue des droits et taxes MG-M2PATE-228780-CS-IND Project Management, Coordi Individual Consult V / 3. Recrutement d'un(e) As IDA / 62450 nation, Monitoring and Evalu Post Open 7,000.00 0.00 Canceled 2021-04-26 2021-06-14 2021-07-05 2021-08-09 2021-09-14 ant Selection sistant(e) du Coordonnateur ation MG-M2PATE-208728-CS-IND V / CERC_ugp_ Recrutement Contingent Emergency Resp Individual Consult IDA / 62450 Post Open 16,667.00 0.00 Canceled 2021-02-16 2021-03-08 2021-04-06 2021-04-27 2021-05-25 2021-09-27 d'un Consultant individuel As onse Component (CERC) ant Selection sistant Technique en BTP MG-M2PATE-208724-CS-IND V / CERC_ugp_ Recrutement Contingent Emergency Resp Individual Consult IDA / 62450 Post Open 16,667.00 0.00 Canceled 2021-02-16 2021-03-09 2021-04-06 2021-04-27 2021-05-25 2021-09-22 d'un Consultant spécialiste e onse Component (CERC) ant Selection n Système informatique MG-M2PATE-189952-CS-CDS Project Management, Coordi / 3- Recrutement d'un Consul IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct 1,000.00 0.00 Canceled 2020-09-14 2021-04-25 2020-09-24 2020-11-28 2020-12-13 tant individuel pour l'élabora ation tion du PPSD MG-M2PATE-208500-CS-IND Contingent Emergency Resp Individual Consult V / CEERC_ugp_ Recrutement IDA / 62450 Post Open 8,000.00 0.00 Canceled 2020-12-14 2021-01-14 2021-02-01 2021-02-22 2021-03-22 2021-09-30 onse Component (CERC) ant Selection d'un Comptable pour les acti vités CERC MG-M2PATE-315036-CS-IND Strenghtening institutional c V / 2.1_Renforcement de cap Individual Consult Pending Impleme IDA / 62450 apacity for resilient urban go Post Open - National 12,500.00 0.00 2022-10-03 2022-11-21 2022-12-12 2023-01-16 2023-04-16 acité en matière de réinstalla ant Selection ntation vernance tion involontaire MG-M2PATE-315039-CS-IND Project Management, Coordi V / 3.1_Recrutement d'un con Individual Consult Under Implement IDA / 62450 nation, Monitoring and Evalu Post Direct - National 15,000.00 0.00 2022-09-19 2022-10-18 2022-09-29 2022-10-20 2022-11-24 2023-01-23 sultant pour la mise à jour du ant Selection ation ation PPSD et des manuels de proc édures MG-M2PATE-315058-CS-IND Project Management, Coordi V / 3_1_Recrutement du char Individual Consult Under Implement IDA / 62450 nation, Monitoring and Evalu Post Limited 10,000.00 0.00 2022-09-21 2023-03-02 2022-09-26 2022-10-17 2022-11-21 2023-04-20 gé de coordination des opéra ant Selection ation ation tions de réinstallation Page 13 MG-M2PATE-324285-CS-CDS Project Management, Coordi / 3_Recrutement d'un Consult Under Implement IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 15,000.00 0.00 2022-11-10 2023-01-03 2022-11-20 2022-12-22 2023-02-20 ant individuel pour la mise à j ation ation our du PPSD PRODUIR MG-M2PATE-324515-CS-IND Project Management, Coordi Individual Consult Under Implement V / 3_Recrutement d'un Assis IDA / 62450 nation, Monitoring and Evalu Post Open - National 12,000.00 0.00 2022-11-16 2022-12-10 2022-12-10 2022-12-15 2023-01-06 2023-02-25 ant Selection ation tant Technique en Urbanisme ation UGP MG-M2PATE-324284-CS-CDS Project Management, Coordi Under Implement / 3_Recrutement d'un Ingénie IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 14,000.00 0.00 2022-11-16 2022-12-10 2022-11-26 2022-12-11 2023-02-24 ation ur Génie Civil UGP ation MG-M2PATE-358743-CS-CDS Project Management, Coordi Individual Consult Pending Impleme / 3_Recrutement d'un deuxiè IDA / 62450 nation, Monitoring and Evalu Post Open - National 13,000.00 0.00 2023-04-26 2023-06-14 2023-07-05 2023-08-09 2025-01-20 ant Selection ntation me Comptable 2023 ation MG-M2PATE-358747-CS-IND Project Management, Coordi Individual Consult Pending Impleme V / 3_Recrutement d'un Expe IDA / 62450 nation, Monitoring and Evalu Post Open - National 18,900.00 0.00 2023-04-26 2023-06-14 2023-07-05 2023-08-09 2025-01-20 ant Selection ntation rt Assistant technique Assain ation issement 2023 MG-M2PATE-358757-CS-IND Project Management, Coordi V / 3_Recrutement d'un Assis Individual Consult Pending Impleme IDA / 62450 nation, Monitoring and Evalu Prior Open - National 18,900.00 0.00 2023-04-26 2023-06-14 2023-07-05 2023-08-09 2025-01-20 tant Technique en passation ant Selection ntation ation de marchés 2023 MG-M2PATE-358759-CS-IND Project Management, Coordi Individual Consult Pending Impleme V / 3_Recrutement d'un Assis IDA / 62450 nation, Monitoring and Evalu Post Open - National 12,000.00 0.00 2023-04-26 2023-06-14 2023-07-05 2023-08-09 2025-01-20 ant Selection ntation tant Administratif et logistiqu ation e 2023 MG-M2PATE-358762-CS-IND Project Management, Coordi Individual Consult Pending Impleme V / 3_Recrutement d'un Expe IDA / 62450 nation, Monitoring and Evalu Post Open - National 19,000.00 0.00 2023-04-26 2023-06-14 2023-07-05 2023-08-09 2025-01-20 ant Selection ntation rt en sauvegardes sociales 2 ation 023 MG-M2PATE-358763-CS-IND Project Management, Coordi Individual Consult Pending Impleme V / 3_Recrutement d'un Assis IDA / 62450 nation, Monitoring and Evalu Post Open - National 19,000.00 0.00 2023-04-26 2023-06-14 2023-07-05 2023-08-09 2025-01-20 ant Selection ntation tant Technique Généraliste C ation UA 2023 MG-M2PATE-358712-CS-CDS Project Management, Coordi Pending Impleme / 3_Recrutement d'un Ingénie IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 22,420.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 ntation ur Génie Civil UGP 2023 ation MG-M2PATE-358719-CS-CDS Project Management, Coordi Pending Impleme / 3_Recrutement d'un Spécial IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 20,200.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 ntation iste Suivi-évaluation 2023 ation MG-M2PATE-358735-CS-CDS Project Management, Coordi Pending Impleme / 3_Recrutement d'un Compt IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 11,000.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 ntation able 2023 ation MG-M2PATE-358727-CS-CDS Project Management, Coordi Pending Impleme / 3_Recrutement d'un Audit i IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 20,200.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 ntation nterne 2023 ation MG-M2PATE-358740-CS-CDS Project Management, Coordi Pending Impleme / 3_Recrutement d'un Assista IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 19,000.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 ntation nt Technique en urbanisme 2 ation 023 MG-M2PATE-358731-CS-CDS Project Management, Coordi Pending Impleme / 3_Recrutement du Coordon IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 50,900.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 ntation nateur de Projet 2023 ation MG-M2PATE-358738-CS-CDS Project Management, Coordi Pending Impleme / 3_Recrutement d'un Expert IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 22,500.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 ntation en sauvegardes environneme ation ntales 2023 MG-M2PATE-358714-CS-CDS / 3-Recrutement d'un Assista Project Management, Coordi nt Technique en charge d'ap Pending Impleme IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 12,268.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 pui à la gestion des plaintes, ntation ation de la lutte contre les violence s basées sur le Genre et de la mobilisation citoyenne 2023 MG-M2PATE-358737-CS-CDS Project Management, Coordi Pending Impleme / 3_Recrutement d'un Respon IDA / 62450 nation, Monitoring and Evalu Post Direct Selection Direct - National 29,000.00 0.00 2023-04-26 2023-05-06 2023-07-10 2025-01-30 ntation sable Administratif et Financi ation er 2023 Page 14 Republic of North Macedonia Local Roads Connectivity Project (P P17026) PROCUREMENT PLAN (Textual Part) Project information: Republic of North Macedonia Project Implementation agency: Ministry of Transport and Communications Date of the Procurement Plan: January 2020 Period covered by this Procurement Plan: Initial Preamble: In accordance with paragraph 5.9 of the World Bank Procurement Regulations for Investment Project Financing (IPF) Borrowers – Procurement in IPF of Goods, Works, Non‐Consulting and Consulting Services, (Regulations) issued in July 2016, revised November 2017 and August 2018 (Procurement Regulations) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. The Procurement and Review Thresholds for the project are as follows: Thresholds for Procurement Approaches and Methods (€ thousands) Works Goods, IT and non- Shortlist of national consulting services consultants Open Open RfQ Open Open RfQ Consulti Engineeri internationa national internati national ng ng and l onal services constructi < ≤ < ≤ on ≥ ≥ ≤ supervisio n ≤ 5,000 5,000 200 1 000 1 000 100 300 N/A Review Arrangements First contract for each First contract for each First contract for each approach approach and method and all approach and method and and method, all TORs and all > 3 000 all > 1 500 contracts > 500 Individual consultants all TORs Direct Selection all > 80 000 Direct Selection all > 80 000 and all contracts > 200 000 Direct Selection all >10 000 PROCUREMENT North Macedonia : North Macedonia: Local Roads Connectivity Project PLAN General Information Country: North Macedonia 2020-01-22 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170267 GPN Date: 2020-05-13 Project Name: North Macedonia: Local Roads Connectivity Project Loan / Credit No: IBRD / 90340 Ministry of Transport and Communications Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LRCP-MK-9034-MK-RFB-A.2.1 .1 / Tender #1 - Physical wor Component 2: Rehabilitation ks for improvement of the loc Single Stage - One E 5,471,033.4 2021-11-1 IBRD / 90340 of Local Roads and Commun Prior Request for Bids Open - National Signed 2020-01-27 2020-06-18 2020-02-10 2020-03-16 2020-09-10 2020-04-15 2020-12-14 2020-05-27 2021-02-10 al road infrastructure in selec nvelope 2 8 ity Facilities ted municipalities according t o design - Lot 1, Lot 2, Lot 3, Lot 4 and Lot 5 LRCP-MK-9034-MK-RFB-A.2.1 .2 / Tender 2 - Physical works Component 2: Rehabilitation for improvement of the local Single Stage - One E 7,041,608.0 2022-03-3 IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National Signed 2020-11-12 2021-03-10 2020-11-20 2021-04-16 2021-01-13 2021-04-19 2021-02-12 2021-08-31 2021-03-31 2021-08-27 road infrastructure in selecte nvelope 3 1 ity Facilities d municipalities according to design - Lot 1, Lot 2, Lot 3, L ot 4, Lot 5 and Lot 6 LRCP-9034-MK-RFB-A.2.1.3( Request for B 1) / Tender 3 - Physical works Component 2: Rehabilitation ids - Works ( for Improvement of the local Single Stage - One E Under Imple 2022-10-1 IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National without preq 0.00 2022-01-17 2021-12-29 2022-01-17 2022-02-07 2022-02-09 2022-02-16 2022-03-11 2022-03-21 2022-04-15 road infrastructure in selecte nvelope mentation 2 ity Facilities ualification) d municipalities according to SPD design – Lot 1 - RFB Ref. No.: LRCP-9034-MK-RFB-A.2.1.3(1 ) LRCP-9034-MK-RFB-A.2.1.3( Request for B 2) / Tender 3 - Physical works Component 2: Rehabilitation ids - Works ( for Improvement of the local Single Stage - One E Under Imple 2022-10-1 IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National without preq 0.00 2022-01-17 2021-12-29 2022-01-17 2022-02-07 2022-02-15 2022-03-08 2022-03-17 2022-04-19 2022-04-21 road infrastructure in selecte nvelope mentation 8 ity Facilities ualification) d municipalities according to SPD design – Lot 2 - RFB Ref. No.: LRCP-9034-MK-RFB-A.2.1.3(2 ) RFB REF.NO.:LRCP-9034-MK- Request for B RFB-A.2.1.3(3) / Tender 3 - P Component 2: Rehabilitation ids - Small W hysical works for Single Stage - One E Under Imple 2022-11-2 IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-02-17 2022-02-14 2022-02-18 2022-02-23 2022-03-20 2022-03-29 2022-04-19 2022-09-28 2022-05-24 Improvement of the local roa nvelope mentation 0 ity Facilities nvelope proc d infrastructure in selected m ess) unicipalities according to des ign – Lot 3 LRCP-9034-MK-RFB-A.2.1.3( 4) / The Tender 3 – Physical Request for B works for improvement of th Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2023-07-1 e local road infrastructure in IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-04-27 2022-04-26 2022-05-02 2022-04-27 2022-06-13 2022-05-20 2022-07-13 2022-07-14 2022-08-17 nvelope mentation 8 selected municipalities accor ity Facilities nvelope proc ding to design - Lot 4 shall be ess) conducted in Municipality Ma kedonski Brod and Municipali ty of Debar. LRCP-9034-MK-RFB-A.2.1.3( Request for B 5) / Tender 3 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2023-08-0 for IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-07-14 2022-07-13 2022-07-14 2022-10-04 2022-08-09 2022-08-09 2022-09-08 2022-09-20 2022-10-13 nvelope mentation 9 Improvement of the local roa ity Facilities nvelope proc d infrastructure in selected m ess) unicipalities according to des ign – Lot 5 LRCP-9034-MK-RFB-A.2.1.4( 1) / Tender 4 - Physical works Request for B for Component 2: Rehabilitation ids - Small W Improvement of the local roa Single Stage - One E Under Imple 2023-04-2 IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-10-03 2022-07-27 2022-10-03 2022-10-04 2022-10-03 2022-08-24 2022-10-03 2022-09-29 2022-10-24 d infrastructure in selected m nvelope mentation 2 ity Facilities nvelope proc unicipalities according to des ess) ign – Lot 1 RFB Ref. No.: LRCP-9034-MK- RFB-A.2.1.4(1) LRCP-9034-MK-RFB-A.2.1.4( Request for B 2) / Tender 4 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2024-06-2 for improvement of the local IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-10-03 2022-09-30 2022-10-03 2022-10-04 2022-11-04 2022-11-17 2022-12-22 nvelope mentation 0 road Infrastructure in selecte ity Facilities nvelope proc d municipalities according to ess) design - Lot 2 LRCP-9034-MK-RFB-A.2.1.3. (4.1) / The Tender 3 – Physic Request for B al works for improvement of Component 2: Rehabilitation ids - Small W the local road infrastructure i Single Stage - One E Under Imple 2023-12-0 IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-10-10 2022-10-12 2022-10-11 2022-11-22 2022-11-20 2022-12-05 2023-01-09 n selected municipalities acc nvelope mentation 5 ity Facilities nvelope proc ording to design - Lot 4 shall ess) be conducted in Municipality Struga, Municipality of Debar and Municipality of Vevcani. LRCP-9034-MK-RFB-A.2.1.4.( Request for B 3) / Procurement of: Component 2: Rehabilitation ids - Small W Tender 4 - Physical works for Single Stage - One E Under Imple 2023-12-1 IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-10-17 2022-10-17 2022-10-18 2022-10-21 2022-11-29 2022-12-14 2023-01-18 Improvement of the local roa nvelope mentation 4 ity Facilities nvelope proc d infrastructure in selected m ess) unicipalities according to des ign Lot 3 LRCP-9034-MK-RFB-A.2.1.4( Request for B 4) / Tender 4 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2024-01-3 for IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-10-26 2022-11-30 2022-10-31 2022-12-01 2022-12-12 2022-12-27 2023-01-31 nvelope mentation 1 Improvement of the local roa ity Facilities nvelope proc d infrastructure in selected m ess) unicipalities according to des ign – Lot 4 LRCP-9034-MK-RFB-A.2.1.4( Request for B 5) / Tender 4 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2023-12-0 for Improvement of the local IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-12-12 2022-12-21 2022-12-16 2023-01-22 2023-01-25 2023-02-10 2023-03-17 nvelope mentation 2 road infrastructure in selecte ity Facilities nvelope proc d municipalities according to ess) design – Lot 5 LRCP-9034-MK-RFB-A.2.1.5( Request for B 1) / Tender 5 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2023-12-0 for Improvement of the local IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-12-27 2022-12-28 2022-12-27 2023-01-22 2023-02-07 2023-03-09 2023-04-13 nvelope mentation 9 road infrastructure in selecte ity Facilities nvelope proc d municipalities according to ess) design – Lot 1 Page 1 LRCP-9034-MK-RFB-A.2.1.5( Request for B 2) / Tender 5 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Pending Imp 2024-02-0 for Improvement of the local IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2022-12-28 2022-12-28 2023-02-08 2023-03-10 2023-04-14 nvelope lementation 8 road infrastructure in selecte ity Facilities nvelope proc d municipalities according to ess) design – Lot 1 LRCP-9034-MK-RFB-A.2.1.1( Request for B 1.1) / Tender 1 - Physical wor Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2023-09-2 ks for IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2023-01-17 2022-12-29 2023-01-17 2023-01-22 2023-01-23 2023-02-22 2023-03-29 nvelope mentation 5 Improvement of the local roa ity Facilities nvelope proc d infrastructure in selected m ess) unicipalities according to des ign – Lot 1.1 LRCP-9034-MK-RFB-A.2.1.5( Request for B 3) / Tender 5 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Pending Imp 2023-12-0 for improvement of the local IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2023-01-17 2023-01-17 2023-02-10 2023-03-12 2023-04-16 nvelope lementation 2 road infrastructure in selecte ity Facilities nvelope proc d municipalities according to ess) design - Lot 3 LRCP-9034-MK-RFB-A.2.1.5( Request for B 4) / Tender 5 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2024-08-2 for improvement of the local IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2023-03-03 2023-03-09 2023-03-03 2023-03-13 2023-04-14 2023-05-14 2023-06-18 nvelope mentation 1 road infrastructure in selecte ity Facilities nvelope proc d municipalities according to ess) design - Lot 4 LRCP-9034-MK-RFB-A.2.1.5( Request for B 5) / Tender 5 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2024-05-0 for improvement of the local IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2023-03-06 2023-03-13 2023-03-07 2023-03-13 2023-04-18 2023-05-18 2023-06-22 nvelope mentation 7 road infrastructure in selecte ity Facilities nvelope proc d municipalities according to ess) design - Lot 5 LRCP-9034-MK-RFB-A.2.1.5( Request for B 6) / Tender 5 - Physical works Component 2: Rehabilitation ids - Small W Single Stage - One E Under Imple 2024-05-0 for improvement of the local IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2023-03-07 2023-04-26 2023-03-09 2023-04-20 2023-05-20 2023-06-24 nvelope mentation 9 road infrastructure in selecte ity Facilities nvelope proc d municipalities according to ess) design - Lot 6 LRCP-90340-MK-RFB -A.2.1.6 Request for B (1) / Tender 6 - Physical work Component 2: Rehabilitation ids - Small W Single Stage - One E Pending Imp 2024-09-0 s for IBRD / 90340 of Local Roads and Commun Post Request for Bids Open - National orks SPD (1 e 0.00 2023-05-19 2023-05-22 2023-07-03 2023-08-02 2023-09-06 nvelope lementation 5 Improvement of the local roa ity Facilities nvelope proc d infrastructure in selected m ess) unicipalities according to des ign – Lot 1 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LRCP-9034-MK-RFQ-A.3.2.5 / Website development, hostin Component 3: Project Imple Request for Quota Single Stage - One E IBRD / 90340 Post Limited 25,482.70 Signed 2021-02-06 2021-02-04 2021-04-03 2021-04-13 2025-12-28 g and maintenance for LRCP mentation Support tions nvelope and WBTTFP within MoTC LRCP-9034-MK-RFQ-A.3.2.4 / Component 3: Project Imple Request for Quota Single Stage - One E IBRD / 90340 Post Limited 44,838.78 Signed 2021-05-12 2021-11-26 2021-07-07 2022-02-28 2021-10-05 Vehicles for the PIU staff mentation Support tions nvelope LRCP-9034-MK-A.3.2.1-RFQ - IT EQUIPMENT / Supply, Instal lation and Configuration of IT Component 3: Project Imple Request for Quota Single Stage - One E Under Imple Equipment for PIU: Lot #1 - D IBRD / 90340 Post Open - National 0.00 2023-02-15 2023-04-12 2023-10-09 mentation Support tions nvelope mentation esktop Personal Computers a nd Monitors; Lot #2 – Notebo oks; Lot 3 – Laser Color Print er A3 size NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LRCP-9034-MK-RFQ-A.3.2.3 / Component 3: Project Imple Request for Quota Single Stage - One E IBRD / 90340 Post Limited 195.27 Signed 2020-09-29 2020-11-24 2020-11-24 2021-01-29 2024-09-24 LRCP-9034-MK-RFQ-A.3.2.3 mentation Support tions nvelope CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LRCP-MK- 9034-MK –RFP - A. 2.1.13 / Supervision consulta Component 2: Rehabilitation ncy for the implementation o Consultant Qualifi IBRD / 90340 of Local Roads and Commun Prior Limited 0.00 Canceled 2020-02-03 2020-02-24 2020-05-05 2020-05-29 2021-12-30 f physical works for Tender # cation Selection ity Facilities 1 for improvement of the loc al road infrastructure in selec ted municipalities LRCP-9034-MK-CS-RFP-A.2.1. Component 2: Rehabilitation 14 / Preparation of design do Quality And Cost- Open - Internationa Pending Impleme IBRD / 90340 of Local Roads and Commun Post 0.00 2020-02-10 2020-02-25 2020-03-31 2020-04-28 2020-05-28 2020-06-15 2020-07-15 2024-09-30 cuments for the sub-projects Based Selection l ntation ity Facilities of the municipalities and desi gn audit LRCP-9034-MK-RFP-A.1.1.2 / Technical assistance for road safety inspection of the selec Component 1: Capacity Enh Quality And Cost- Open - Internationa Under Implement ted parts of the municipal ro IBRD / 90340 Post 0.00 2020-05-01 2021-08-31 2020-05-22 2020-07-05 2022-03-24 2020-08-02 2022-05-06 2020-09-01 2022-10-13 2020-10-06 2022-11-01 2020-11-10 2023-04-29 ancement Based Selection l ation ad network, preparation of in tervention action plan, road s afety inspection guidelines a nd training to the municipal s taff LRCP-MK-9034-REOI-A.2.1.5. 1 - A.2.1.5.2 / Consulting Ser Component 2: Rehabilitation vices for Supervision of the ci Consultant Qualifi IBRD / 90340 of Local Roads and Commun Prior Limited 356,685.67 Signed 2020-04-16 2020-05-14 2020-04-30 2020-11-30 2020-05-30 2021-02-08 2020-07-04 2021-04-06 2022-02-04 vil works for improvement of cation Selection ity Facilities the local road infrastructure i n selected municipalities - Ye ar 1, Tender#1 and Tender# 2 Page 2 LRCP-9034-MK-REOI-A.1.1.1 / Technical advisor to develo p multi annual investment pr ogram - pipeline of municipal Component 1: Capacity Enh Consultant Qualifi sub-projects for investment a IBRD / 90340 Post Open - National 418,518.21 Signed 2020-05-20 2020-07-22 2020-06-10 2020-10-01 2020-07-24 2020-12-24 2020-08-23 2021-03-05 2020-09-27 2021-04-14 2021-03-26 ancement cation Selection nd maintenance, training to t he municipal staff on sustain able multi annual infrastruct ure projects planning for inve stment and maintenance LRCP-9034-MK-RFP-A.1.1.4 / Technical Assistance for impl Component 1: Capacity Enh Quality And Cost- Open - Internationa IBRD / 90340 Post 1,136,323.04 Signed 2020-05-24 2020-07-29 2020-06-14 2020-10-05 2020-07-28 2021-04-21 2020-08-25 2021-05-28 2020-09-24 2021-11-01 2020-10-29 2021-12-10 2020-12-03 2022-04-20 2024-10-03 ementation support for Local ancement Based Selection l Roads Management LRCP-9034-MK-RFP-A.4.1 / L Component 4: Contingent E RCP-9034-MK-RFP-A.4.1 - Au Least Cost Selecti IBRD / 90340 mergency Response Compo Post Open - National 31,944.33 Signed 2020-07-20 2020-07-29 2020-08-10 2020-08-24 2020-09-23 2020-10-14 2020-10-21 2020-12-11 2020-11-20 2020-12-16 2020-12-25 2021-04-26 2021-01-29 2021-05-08 2021-07-28 dit of Contingency Emergenc on nent y Response Component - CE RC LRCP-9034-MK–RFP-A.1.2.3 / Technical Assistance for Roa d Safety Capacity Review wit Component 1: Capacity Enh Consultant Qualifi Open - Internationa IBRD / 90340 Post 299,391.63 Signed 2020-08-07 2021-06-01 2020-08-28 2021-06-01 2020-10-11 2021-11-17 2020-11-10 2022-02-23 2020-12-15 2022-03-25 2021-08-31 h improvements of road safe ancement cation Selection l ty management capacity at municipality level (Local Com munities) LRCP-9340-MK-A.3.2.6 / Fina Component 3: Project Imple Least Cost Selecti ncial Audit of the WBTTFP an IBRD / 90340 Prior Open - National 48,680.67 Signed 2021-03-10 2021-03-16 2021-03-31 2021-03-22 2021-04-21 2021-04-26 2021-05-19 2021-06-01 2021-06-03 2021-06-23 2021-07-01 2021-08-13 2021-08-05 2021-09-15 2022-04-12 mentation Support on d LRCP Projects LRCP-MK-9034-REOI-A.2.1.7 / Consulting Services for Sup Component 2: Rehabilitation Consultant Qualifi ervision of the civil works for IBRD / 90340 of Local Roads and Commun Post Open - National 456,930.00 Signed 2022-02-23 2022-03-18 2022-03-10 2022-04-15 2022-04-23 2022-05-06 2022-05-23 2022-06-20 2022-06-27 2022-07-02 2023-11-09 cation Selection improvement of the local roa ity Facilities d infrastructure in selected m unicipalities (T3 & T4) LRCP-9034-MK-QBS-A.2.1.8 / Consulting Services for Super Component 2: Rehabilitation Quality Based Sel Open - Internationa Under Implement vision of the civil works for i IBRD / 90340 of Local Roads and Commun Post 0.00 2022-11-04 2022-11-10 2022-12-06 2022-11-21 2023-01-19 2023-01-17 2023-02-16 2023-03-14 2023-03-18 2023-04-17 2023-05-22 2025-01-22 ection l ation mprovement of the local roa ity Facilities d infrastructure in selected m unicipalities (Tender no.3) LRCP-9034-MK-CS-CQS-A.1.1 .5 / Technical assistance for Development of sustainable Component 1: Capacity Enh Consultant Qualifi Under Implement urban mobility plans for five IBRD / 90340 Post Open - National 0.00 2023-02-10 2023-02-09 2023-03-13 2023-03-15 2023-03-31 2023-04-30 2023-06-04 2024-12-27 ancement cation Selection ation municipalities and providing training on developing and i mplementation of sustainabl e urban mobility plans INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2020-05-26 2020-06-02 2020-07-14 2020-11-10 2020-08-04 2020-11-18 2020-09-08 2022-08-09 7 / Traffic Expert mentation Support ant Selection ation LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2020-05-26 2020-06-02 2020-07-14 2020-11-10 2020-08-04 2020-11-18 2020-09-08 2024-10-17 5 / Transport Road Infrastruct mentation Support ant Selection ation ure Expert LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2020-05-26 2020-06-02 2020-07-14 2020-11-10 2020-08-04 2020-11-18 2020-09-08 2024-10-17 6 / Transport Road Infrastruct mentation Support ant Selection ation ure Expert LRCP-9034-MK-REOI-A.3.1.1 Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2020-05-26 2020-06-02 2020-07-14 2020-11-10 2020-08-04 2020-11-18 2020-09-08 2024-10-17 1 / Environmental and Social mentation Support ant Selection ation Specialist LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult IBRD / 90340 Prior Open 143,135.00 Signed 2020-11-10 2020-11-12 2020-12-29 2020-11-16 2021-01-19 2020-11-16 2021-02-23 2019-10-26 2025-02-02 1 / Project Director mentation Support ant Selection LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult IBRD / 90340 Post Open 186,892.37 Signed 2020-11-10 2020-11-12 2020-12-29 2020-11-16 2021-01-19 2020-11-17 2021-02-23 2019-10-29 2025-02-02 2 / Transport Infrastructure E mentation Support ant Selection xpert #1 LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2020-11-10 2020-11-12 2020-12-29 2020-11-16 2021-01-19 2020-11-17 2021-02-23 2025-02-02 3 / Transport Infrastructure E mentation Support ant Selection ation xpert #2 LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2020-11-10 2020-11-12 2020-12-29 2020-11-16 2021-01-19 2020-11-17 2021-02-23 2025-02-02 4 / Transport Infrastructure E mentation Support ant Selection ation xpert #3 LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult IBRD / 90340 Post Open 54,000.00 Signed 2020-11-10 2020-11-12 2020-12-29 2020-11-16 2021-01-19 2020-11-17 2021-02-23 2019-11-02 2025-02-02 8 / Procurement Specialist # mentation Support ant Selection 1 LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2020-11-10 2020-11-12 2020-12-29 2020-11-16 2021-01-19 2020-11-17 2021-02-23 2025-02-02 9 / Procurement Specialist # mentation Support ant Selection ation 2 LRCP-90340-MK-REOI-A.3.1. Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2020-11-10 2020-11-12 2020-12-29 2020-11-16 2021-01-19 2020-11-17 2021-02-23 2025-02-02 10 / Financial Management S mentation Support ant Selection ation pecialist LRCP-9034-MK-A.3.1.15-1-C S-IC-DS / Support to carry out Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Direct 0.00 2022-06-03 2022-06-06 2022-06-13 2022-06-07 2022-07-04 2022-11-23 2022-08-08 2024-12-25 surveys in regard to Environ mentation Support ant Selection ation mental and Social Safeguard LRCP-9034-MK-REOI-A.3.1.1 Component 3: Project Imple Individual Consult Under Implement 2.1 / Environmental and Soci IBRD / 90340 Post Open 0.00 2022-06-24 2022-07-20 2022-08-12 2022-10-31 2022-09-02 2022-10-07 2024-06-18 mentation Support ant Selection ation al Specialist #2 LRCP-9034-MK-REOI-A.3.1.1 Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2022-06-24 2022-07-22 2022-08-12 2022-10-31 2022-09-02 2022-11-18 2022-10-07 2024-06-18 3.1 / Road Infrastructure Exp mentation Support ant Selection ation ert #6 LRCP-9034-MK-REOI-A.3.1.1 Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open 0.00 2022-06-24 2022-07-22 2022-08-12 2022-09-02 2022-10-07 2024-06-18 3.2 / Road Infrastructure Exp mentation Support ant Selection ation ert #7 LRCP-90340-MK-REOI-A..3.1. Component 3: Project Imple Individual Consult Under Implement IBRD / 90340 Post Open - National 0.00 2022-09-20 2022-10-03 2022-11-08 2023-02-20 2022-11-29 2023-02-27 2023-01-03 2024-07-26 13.3 / Traffic Expert. no.2 mentation Support ant Selection ation Page 3 LRCP-9034-MK-REOI-A.3.1.6. Component 3: Project Imple Individual Consult Pending Impleme 1 / Transport Road Infrastruct IBRD / 90340 Post Open - National 0.00 2022-12-26 2023-02-01 2023-02-22 2023-03-29 2024-12-18 mentation Support ant Selection ntation ure Expert #6 LRCP-9034-MK-REOI-A.3.1.1 Component 3: Project Imple Individual Consult Pending Impleme IBRD / 90340 Post Open - National 0.00 2022-12-26 2023-02-13 2023-03-06 2023-04-10 2024-12-30 3.4 / Traffic Expert no.3 mentation Support ant Selection ntation LRCP-9034-MK-REOI-A.3.12. Component 3: Project Imple Individual Consult Pending Impleme 2 / Environmental and Social IBRD / 90340 Post Open - National 0.00 2022-12-28 2023-02-15 2023-03-08 2023-04-12 2025-01-01 mentation Support ant Selection ntation Specialist #3 LRCP-90340-MK-REOI-A..3.1. 13.4 / Procurement Specialist #3 Component 3: Project Imple Individual Consult Under Implement (Total amount for this positio IBRD / 90340 Post Open - National 0.00 2023-04-26 2023-04-26 2023-06-14 2023-07-05 2023-08-09 2025-02-06 mentation Support ant Selection ation n is EUR 54,000, 50 % will be financed from WBTTFP and 5 0% from LRCP. Contract dura tion is up to the end of WBTT FP.) LRCP-90340-MK-REOI-A..3.1. 12 / Administrative and Finan cial Management Assistant (Total amount for this positio Component 3: Project Imple Individual Consult IBRD / 90340 Post Open - National 0.00 Canceled 2023-04-27 2023-04-26 2023-06-15 2023-07-06 2023-08-10 2025-02-07 n is EUR 45,000, 50 % will be mentation Support ant Selection financed from WBTTFP and 5 0% from LRCP. Contract dura tion is up to the end of WBTT FP.) Page 4 Tuvalu Energy Sector Development Project Procurement Plan Implementing Agency: Tuvalu Electricity Corporation (TEC) Date: 7 December 2017 Procurement of Goods, Works and Non- Consulting Services Contract No. Description Estimated Cost (USD Million) Remote monitoring and ESPD/TUV/SH/1 communciations 0.1 equipment Fiber Optic cable to ESPD/TUV/SH/2 0.05 connect grid EPC Works for 700kW ESPD/TUV/ICB/ Solar PV Facility and 5 1 1MW/1MWh Energy Storage System ESPD/TUV/SH/4 EE Investments - Cool Rooms 0.2 ESPD/TUV/SH/5 EE Investments - Insulation 0.2 ESPD/TUV/SH/6 Motorbike 0.002 ESPD/TUV/SH/7 Laptop and printer 0.003 ESPD/TUV/ICB/ Prepayment meter 0.49 2 system EPC Works for Wind ESPD/TUV/ICB/ Turbines and grid-control 2.235 3 equipment Selection of Consultants Contract No. Description Estimated Cost (USD Million) ESPD/TUV/IC/1 Project Officer 0.09 ESPD/TUV/IC/2 Procurement Advisor 0.05 ESPD/TUV/IC/3 Safeguards Advisor 0.02 ESPD/TUV/CQS/ Technical support 0.05 1 ESPD/TUV/IC/4 PT BookKeeper 0.02 ESPD/TUV/IC/5 Energy Specialist 0.08 PROCUREMENT Tuvalu : Energy Sector Development Project PLAN General Information Country: Tuvalu 2017-10-31 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P144573 GPN Date: Project Name: Energy Sector Development Project Loan / Credit No: IDA / D0290, TF / 18949 Tuvalu Electricity Corporation Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned TV-TEC-62180-CW-RFP / Des Renewable Energy Investme Open - Internationa Single Stage - One E 2019-05-1 ign, Supply and installation f IDA / D0290 Prior Request for Bids 2,000,200.00 0.00 Canceled 2018-07-10 2018-07-15 2018-08-26 2018-09-25 2018-11-13 nts l nvelope 2 or Wind Turbines and Grid-Co ntrol Equipment ESDP/TUV/ICB/1 / Design, Su pply and installation of 700k Renewable Energy Investme Open - Internationa Single Stage - One E 2019-10-1 IDA / D0290 Prior Request for Bids 5,000,000.00 0.00 Canceled 2018-12-05 2018-12-06 2018-12-07 2018-05-30 2018-12-08 2018-12-19 2019-01-16 W Solar PV Facility and 1MW/ nts l nvelope 3 MWh Energy Storage System ESDP/TUV/DC/1 / Design, Su pply and Installation of 750k Renewable Energy Investme 5,328,419.5 2020-08-2 IDA / D0290 Prior Direct Selection Direct 6,000,000.00 Signed 2019-06-18 2019-06-28 2019-06-23 2019-07-23 2019-07-21 2019-09-23 W Solar PV Facility and 1MW/ nts 6 4 1MWh Energy Storage Syste m National Procure TV-TEC-335210-CW-DIR / De ment Document - sign, Supply and Installation Renewable Energy Investme Direct - Internation Under Imple 2023-08-2 TF / 18949 Post Direct Selection 1 Envelope proce 2,300,000.00 0.00 2023-01-13 2023-01-15 2023-01-18 2023-01-16 2023-02-22 of Solar PV Facility and Energ nts al mentation 1 ss (Non Bank-SPD y Storage System ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ESPD/TUV/SH/8 / Audio Visu Renewable Energy Investme Request for Quota Single Stage - One E IDA / D0290 Post Limited 10,000.00 15,001.24 Signed 2018-02-28 2018-12-11 2018-04-25 2019-03-05 2018-10-22 al Equipment nts tions nvelope TV-TEC-62169-GO-RFB / Pre Energy Efficiency Investmen Open - Internationa Single Stage - One E IDA / D0290 Prior Request for Bids 700,000.00 392,444.43 Signed 2018-06-03 2018-06-05 2018-06-10 2018-06-13 2018-07-15 2018-07-18 2018-08-14 2018-09-10 2018-09-18 2019-04-05 2019-03-17 payment meter system ts l nvelope ESDP/TUV/SH/9 / Electric Mo torcycles for pilot program u Renewable Energy Investme Request for Quota Open - Internationa Single Stage - One E IDA / D0290 Post 400,000.00 0.00 Canceled 2019-11-15 2019-11-15 2020-01-20 2020-07-18 nder the Tuvalu Energy Sect nts tions l nvelope or Development Project ESDP/TUV/SH1 / Supply and I Energy Efficiency Investmen Request for Quota Open - Internationa Single Stage - One E nstallation of HF Radios for T TF / 18949 Post 150,000.00 89,252.25 Signed 2019-11-12 2020-02-04 2020-03-12 2020-06-03 ts tions l nvelope uvalu Electricity Corporation ESDP/TUV/SH/10 / Window Ti Energy Efficiency Investmen Request for Quota Open - Internationa Single Stage - One E nting of Tuvalu National Hosp IDA / D0290 Post 65,000.00 37,229.85 Signed 2020-05-23 2020-05-20 2020-07-11 2020-08-28 2020-12-08 ts tions l nvelope ital and Conference Center ESDP/TUV/SH/9/2020 / Electr ic Motorcycles for a pilot pro Renewable Energy Investme Request for Quota Open - Internationa Single Stage - One E IDA / D0290 Post 300,000.00 0.00 Canceled 2020-02-02 2020-01-31 2020-04-05 2020-09-30 gram under the Tuvalu Energ nts tions l nvelope y Sector Development Projec t ESDP/TUV/SH9/2021 / (Re-A Energy Efficiency Investmen Request for Quota Open - Internationa Single Stage - One E Under Imple d) Supply of Electric Motorcy IDA / D0290 Post 200,000.00 0.00 2021-05-18 2021-06-20 2021-08-12 2022-02-08 ts tions l nvelope mentation cles for the Tuvalu Electricity Corporation TV-TEC-362809-GO-RFQ / Su Renewable Energy Investme Request for Quota Single Stage - One E Under Imple pply of Materials and Tools (I IDA / D0290 Post Limited 55,000.00 0.00 2023-05-29 2023-06-07 2023-07-24 2024-01-20 nts tions nvelope mentation nstallation of Prepayment me ters) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ESDP/TUV/SH5 / Window Tint Energy Efficiency Investmen Request for Quota Open - Internationa Single Stage - One E IDA / D0290 Post 200,000.00 82,963.50 Signed 2019-02-14 2019-04-05 2019-06-14 2019-07-04 ing for Tuvalu Government B ts tions l nvelope uilding CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ESPD/TUV/CQS/1 / Technical Technical Assistance and Pro Consultant Qualifi Open - Internationa IDA / D0290 Post 50,000.00 0.00 Canceled 2017-07-01 2017-07-22 2017-09-04 2017-10-04 2017-11-08 2018-05-07 Support ject Management Support cation Selection l ESPD/TUV/IC/2 / Procuremen Technical Assistance and Pro Consultant Qualifi Open - Internationa IDA / D0290 Prior 50,000.00 0.00 Canceled 2016-07-26 2016-08-16 2016-09-29 2016-10-29 2016-12-03 2017-06-01 t Adviser ject Management Support cation Selection l ESDP/TUV/CQS/2 / Engineeri Renewable Energy Investme Consultant Qualifi Open - Internationa ng Services for Renewable E IDA / D0290 Post 495,000.00 418,820.00 Signed 2019-10-31 2019-11-01 2019-11-01 2019-11-03 2019-11-20 2019-12-23 2019-12-13 2020-07-22 2020-01-06 2020-07-26 2020-09-30 nts cation Selection l nergy Projects in Funafuti, Tu valu INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Page 1 Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ESPD/TUV/IC/1 / Project Offic Technical Assistance and Pro Individual Consult IDA / D0290 Prior Limited 90,000.00 0.00 Canceled 2016-11-14 2016-11-19 2016-12-10 2017-01-14 2017-07-13 er ject Management Support ant Selection TV-TEC-74269-CS-INDV / PR Renewable Energy Investme Individual Consult OVISION FOR IMPLEMENTATI IDA / D0290 Post Open 12,880.00 30,240.00 Signed 2018-08-13 2018-08-25 2018-08-25 2018-08-24 2018-08-27 2018-08-24 2019-03-15 nts ant Selection ON SUPPORT ADVISER TV-TEC-62184-CS-INDV / Top -up of Procurement Advisor n Renewable Energy Investme Individual Consult IDA / D0290 Post Open 49,815.00 0.00 Canceled 2018-06-01 2018-07-20 2018-08-10 2018-09-14 2019-03-13 ew payment ceiling amended nts ant Selection via Addenda 6 ESPD/TUV/IC/3 / Safeguards Technical Assistance and Pro Individual Consult IDA / D0290 Post Open 20,000.00 32,885.00 Signed 2018-02-19 2018-02-19 2018-02-19 2018-02-23 2018-02-19 2018-02-23 2019-02-22 Adviser ject Management Support ant Selection ESDP/TUV/IC/5A / Energy Sp Technical Assistance and Pro Individual Consult TF / 18949 Post Direct 60,000.00 152,928.00 Signed 2019-02-20 2019-02-20 2019-02-20 2019-03-13 2018-03-22 2019-03-31 ecialist 2 ject Management Support ant Selection ESDP/TUV/IC/6/2019 / New c Technical Assistance and Pro Individual Consult ontract for the Implementati IDA / D0290 Post Direct 37,000.00 52,676.00 Signed 2019-03-29 2019-03-31 2019-03-31 2019-03-31 2019-04-01 2020-03-31 ject Management Support ant Selection on Support Adviser ESDP/TUV/IC/2/2016 / Procur ement Advisor to the Tuvalu Technical Assistance and Pro Individual Consult IDA / D0290 Post Open 45,000.00 44,375.00 Signed 2019-04-03 2019-04-03 2019-04-03 2019-04-04 2016-07-26 2019-04-05 Energy Sector Development ject Management Support ant Selection Project (2016 - 2017) ESDP/TUV/IC/2/2017 / Contra ct number 2/Extension for th Technical Assistance and Pro Individual Consult IDA / D0290 Post Direct 45,000.00 173,130.00 Signed 2019-04-03 2019-04-03 2019-04-03 2019-04-03 2017-08-01 2019-04-03 e Procurement Advisor to the ject Management Support ant Selection Tuvalu Energy Sector Develo pment Project ESDP/TUV/IC/7 / New Project Technical Assistance and Pro Individual Consult IDA / D0290 Post Open 36,000.00 11,063.84 Signed 2019-05-31 2019-11-08 2019-06-25 2019-12-18 2019-07-02 2020-02-03 2019-07-30 2020-02-20 2020-01-26 Officer ject Management Support ant Selection ESDP/TUV/IC/8 / Bookkeeper Technical Assistance and Pro Individual Consult IDA / D0290 Post Direct 30,000.00 15,796.52 Signed 2019-11-04 2019-11-10 2019-11-10 2019-11-14 2019-11-11 2019-11-20 2019-11-29 2019-11-26 2020-05-27 for the TESDP ject Management Support ant Selection TV-TEC-311682-CS-INDV / Pr Technical Assistance and Pro Individual Consult IDA / D0290 Post Open - National 55,000.00 0.00 Canceled 2022-08-26 2022-08-26 2022-10-14 2022-11-01 2022-11-04 2022-12-09 2023-06-07 oject Coordinator ject Management Support ant Selection TV-TEC-315706-CS-CDS / Le Technical Assistance and Pro Direct - Internation IDA / D0290 Post Direct Selection 35,000.00 0.00 Canceled 2022-09-16 2022-09-20 2022-09-26 2022-11-30 2023-05-29 gal Advisor ject Management Support al TV-TEC-317511-CS-CDS / Le Technical Assistance and Pro Direct - Internation IDA / D0290 Post Direct Selection 100,000.00 0.00 Signed 2022-09-27 2022-10-13 2022-10-06 2022-12-14 2022-12-10 2023-06-08 gal Advisor ject Management Support al TV-TEC-362847-CS-INDV / Pr Technical Assistance and Pro Individual Consult Under Implement IDA / D0290 Post Open - National 37,000.00 0.00 2023-05-23 2023-06-14 2023-07-11 2023-08-01 2023-09-05 2024-03-03 oject Accountant ject Management Support ant Selection ation Technical Assistance and Pro Individual Consult 2 / Procurement Advisor IDA / D0290 Prior Open 0.00 40,670.00 Signed 2016-01-27 2016-02-26 2016-03-01 2016-04-26 2017-08-01 2017-04-21 ject Management Support ant Selection ESDP/TUV/IC/1 / Project Offic Renewable Energy Investme Individual Consult IDA / D0290 Prior Open 0.00 27,811.88 Terminated 2016-11-23 2016-12-20 er nts ant Selection Page 2 PLAN DE PASSATION DE MARCHES Information sur le Projet : Tchad/Projet : Projet d’Amélioration des Résultats d’Apprentissage de l’Education de Base (PARAEB) – Financement IDA P175803 Agence d’exécution du Projet : Ministère de l'Education Nationale et de la Promotion Civique (MENPC) Date du plan de passation des marchés : février 2022 Période couverte par ce plan de passation des marchés : 18 mois Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du Tchad pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans les DECRETS : n° 2130/PR/2020 Portant Code des Marchés Publics du Tchad, n°2499/PR/2020 fixant les seuils de passation, de contrôle et d’approbation des marchés publics et n°2500/PR/2020 portant procédure simplifiée de la Commande Publique. Ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : 1 Les dispositions à respecter pour un appel d’offres/à propositions ouvert national sont les suivantes : a. le dossier d’appel d’offres/à propositions oblige le Soumissionnaire/Proposant présentant une Offre/Proposition à déposer un agrément signé, qui sera joint à tout contrat éventuel, pour confirmer qu’il applique et respecte les Directives de la Banque pour la lutte contre la corruption, y compris sans limitation, le droit de la Banque de sanctionner et les droits de la Banque pour l’inspection et l’audit ; b. Les documents de passation des marchés incluent des dispositions, convenues avec la Banque, destinées à atténuer de manière adéquate les risques et impacts environnementaux, sociaux (y compris l'exploitation et les abus sexuels et la violence basée sur le genre), l’hygiène et la sécurité (« ESHS ») ; c. les droits de la Banque d’examiner le dossier et les activités de passation des marchés ; d. l’existence d’un mécanisme efficace d’examen des plaintes ; et e. la gestion et l’archivage des dossiers relatifs au Processus de la Passation des Marchés. Les autres modalités nationales de passation des marchés (autres que sous forme d’appel d’offres/à propositions national ouvert) qui pourraient être appliquées par l’Emprunteur (appel d’offres limité/restreint, demande de prix/consultation de fournisseurs, entente directe) doivent être conformes avec les Principes Fondamentaux de Passation des Marchés de la Banque et garantir que les Directives de la Banque contre la corruption, son Cadre de Sanctions et les recours contractuels visés dans l’Accord Juridique s’appliquent. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). - Fournitures : ne s’applique pas - Travaux : ne s’applique pas 2 L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique. « Sans objet » Autres informations pertinentes sur la passation des marchés « Sans objet » 3 % Date de Catégori Montant Numéro financ démarrag e de Approche du Méthode de estimé Type de de é par e prévue Description passatio marché/ passation de (Dollars revue Référen la (jj/mm/aa n de Compétition marché US) ce Banqu aa) marché e Fournitures Fournitures de bureau pour F1 Fournitur Nationale/ Demande de 10 000 100 A Postériori 11/04/2022 l’UGP et l’EPP es ouverte Cotation Acquisition équipements salles F2 Fournitur Nationale/ Appel d’Offres 306 500 100 A Postériori 30/05/2022 multimédias es ouverte National Acquisition tablettes F3 Fournitur Entente Directe UNOPS 13 809 960 100 A Priori 20/06/2022 es Acquisition de moyens roulants F4 Fournitur nationale/ Appel d’Offres 816 667 100 A Postériori 25/05/2022 es ouverte National Acquisition de matériels F5 Fournitur nationale/ Appel d’Offres 45 000 100 A Postériori 25/05/2022 informatiques es ouverte National Acquisition de mobiliers de F6 Fournitur nationale/ Appel d’Offres 40 000 100 A Postériori 25/05/2022 bureau es ouverte National Impression et distribution de S1 Service nationale/ Appel d’Offres 1 100 000 100 A Postériori 25/08/2022 manuels ouverte National Services de consultants Recrutement d’un Consultant C1 nationale/ Consultant 3000 100 A Postériori pour la Traduction de ouverte Individuel 15/04/2022 documents 4 % Date de Catégori Montant Numéro financ démarrag e de Approche du Méthode de estimé Type de de é par e prévue Description passatio marché/ passation de (Dollars revue Référen la (jj/mm/aa n de Compétition marché US) ce Banqu aa) marché e Recrutement d’un Consultant C2 Services nationale Sélection de 33 333 100 A Posteriori pour une évaluation de /ouverte Consultants 29/04/2022 Environnementale du projet consultan Individuels ts Recrutement d’un consultant C3 Services Nationale Sélection de 27 000 100 A Postériori pour une évaluation de la de Ouverte Consultants situation de référence (baseline) consultan Individuels des indicateurs du cadre de ts 25/05/2022 résultats du projet et l’élaboration de la section de suivi évaluation du manuel d’exécution du projet Recrutement d’un consultant C4 Services Nationale Sélection de 18 000 100 A Postériori 15/04/2022 pour l’élaboration du Manuel de de Ouverte Consultants procédures administratives, consultan Individuels Financières et Comptables ts Recrutement d’un consultant C5 Services Nationale Sélection de 27 000 100 A Postériori pour l’élaboration du Manuel de Ouverte Consultants 25/04/2022 d’exécution du projet (Project consultan Individuels implementation Manual) ts Recrutement d’un consultant C6 Services Internationale SFQC 570 000 100 A Posteriori (cabinet) pour un appui au de ouverte recensement général des consultan 20/05/2022 établissements scolaires du ts Tchad (pré-scolaire, primaire et secondaire) Recrutement d’un consultant C7 Services Nationale SQC 15 000 100 A Posteriori pour une assistance en matière de /ouverte 20/04/2022 de communication consultan 5 % Date de Catégori Montant Numéro financ démarrag e de Approche du Méthode de estimé Type de de é par e prévue Description passatio marché/ passation de (Dollars revue Référen la (jj/mm/aa n de Compétition marché US) ce Banqu aa) marché e ts Recrutement d’un cabinet pour C8 Services SQC 12 500 100 A Posteriori 11/04/2022 le recrutement du personnel clé de Nationale du projet (Coordonnateur consultan /ouverte national, RAF, SPM, RSE) ts Recrutement d’un consultant C9 Services ouverte Sélection de 18 000 100 A Posteriori 31/05/2022 pour l’élaboration du plan de Consultants stratégique des ENIB en consultan Individuels mettant en évidence les besoins ts en manuels et matériels de formation et les livres à mettre à disposition des élèves maîtres. Recrutement d’un consultant C10 Services Nationale SFQC 200 000 100 A Posteriori (cabinet) pour une enquête de de ouverte base sur l’observation de consultan classes au niveau du primaire ts en mettant en évidence les modules, les besoins en matière 25/05/2022 didactiques, manuels en cours d’emploi existants et l’identification des sites de construction de salles de classes (utilisant l’outil TEACH) Recrutement d’un consultant C11 Services Nationale SFQC 75 000 100 A Posteriori (cabinet) pour la préparation, de ouverte 20/05/2022 l’élaboration de stratégie, et ou consultan 6 % Date de Catégori Montant Numéro financ démarrag e de Approche du Méthode de estimé Type de de é par e prévue Description passatio marché/ passation de (Dollars revue Référen la (jj/mm/aa n de Compétition marché US) ce Banqu aa) marché e pilotage de programmes ts comme la remédiation, la lecture à la maison, paiement basé sur la performance des écoles communautaires, enseignants communautaires, construction communautaire, etc. Recrutement d’un cabinet pour C12 Services Internationale SFQC 8 744 000 100 A Priori la géolocalisation des écoles de ouverte 29/04/2022 consultan ts TRAVAUX Construction salles de classes et T1 travaux Internationale/ Appel d’Offres 17 124 545 100 A priori blocs de latrine en milieu urbain ouverte 30/06/2022 (Lots à définir) Construction salles de classes et T2 travaux *Approche Appel d’Offres 20 356 364 100 A postériori blocs de latrine en milieu rural communautaire National local (multiples lots suivant la nationale 30/09/2022 définition des zones/écoles d’intervention) Construction des espaces T3 travaux Nationale/ouver Appel d’Offres 4 080 000 100 A postériori 30/06/2022 couverts (lots à déterminer) te National 67 431 869 7 * Approche communautaire pourrait être : ouverte/limitée/directe/ (locale/Régionale /Nationale) suivant les zones d’interventions. 8 PROCUREMENT Chad : CHAD Improving Learning Outcomes Project PLAN General Information Country: Chad 2022-08-05 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175803 GPN Date: Project Name: CHAD Improving Learning Outcomes Project Loan / Credit No: IDA / V4050, IDA / E0180 Ministry of National Education- Chad Improving Learning Outcomes Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Bids - TD-CILOP-338584-CW-RFB / Component 4: Capacity buil Single Stage - One E Works (without pr Pending Imp 2023-09-0 Travaux de réhabilitation et e IDA / E0180 ding, project management, Post Request for Bids Open - National 250,000.00 0.00 2023-01-31 2023-02-05 2023-03-07 2023-03-28 2023-05-11 nvelope equalification) SP lementation 8 xtension des bureaux du Proj monitoring and evaluation D et PARAEB National Procure TD-CILOP-343405-CW-RFB / ment Document - Component 2: Improving acc Single Stage - One E Pending Imp 2024-02-0 Construction de 500 espaces IDA / E0180 Post Request for Bids Open - National 1 Envelope proce 522,184.00 0.00 2023-04-17 2023-04-22 2023-06-03 2023-07-03 2023-08-07 ess to learning nvelope lementation 3 couverts par l'approche com ss (Non Bank-SPD munautaire ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TD-CILOP-342666-GO-RFQ / Fourniture de sucre, café et a Component 4: Capacity buil Request for Quota Single Stage - One E Pending Impl utres produits pour les burea IDA / V4050 ding, project management, Post Limited 8,294.00 0.00 2023-03-08 2023-03-18 2023-03-25 tions nvelope ementation ux du personnel du PARAEB monitoring and evaluation pour une période d'un an. TD-CILOP-342695-GO-RFQ / Component 4: Capacity buil Achat des palettes d'eau et Request for Quota Single Stage - One E Pending Impl IDA / V4050 ding, project management, Post Limited 11,795.00 0.00 2023-03-11 2023-05-06 2023-11-02 autres boissons non alcoolisé tions nvelope ementation monitoring and evaluation es pour les bureaux du PARA EB TD-CILOP-342903-GO-RFQ / Component 4: Capacity buil Request for Quota Single Stage - One E Under Imple Achat des fournitures de bur IDA / E0180 ding, project management, Post Limited 34,130.00 0.00 2023-03-13 2023-05-08 2023-11-04 tions nvelope mentation eau pour le personnel du PAR monitoring and evaluation AEB TD-CILOP-342972-GO-RFQ / Component 4: Capacity buil Request for Quota Single Stage - One E Under Imple Acquisition des Matériels et IDA / E0180 ding, project management, Post Limited 67,154.00 0.00 2023-03-06 2023-02-23 2023-03-31 2023-04-07 tions nvelope mentation Mobiliers de bureau du PARA monitoring and evaluation EB TD-CILOP-343359-GO-RFQ / Component 4: Capacity buil Achat de gasoil pour le group Request for Quota Single Stage - One E Pending Impl IDA / E0180 ding, project management, Post Limited 29,850.00 0.00 2023-03-10 2023-03-20 2024-03-19 e et les dotations en carbura tions nvelope ementation monitoring and evaluation nt des Consultants du PARAE B TD-CILOP-343501-GO-RFQ / Fournitures et installation de Component 4: Capacity buil Request for Quota Single Stage - One E Pending Impl deux téléviseurs de 50"+aba IDA / E0180 ding, project management, Post Limited 3,413.00 0.00 2023-04-10 2023-06-05 2023-12-02 tions nvelope ementation ndonnement tout canal d'un monitoring and evaluation an d'un cout unitaire de 1706 USD. TD-CILOP-343520-GO-RFQ / Component 4: Capacity buil Acquisition , installation et M Request for Quota Single Stage - One E Pending Impl IDA / E0180 ding, project management, Post Limited 33,447.00 0.00 2023-04-02 2023-05-28 2023-11-24 aintenance d'un générateur tions nvelope ementation monitoring and evaluation 100Kwa pour le PARAEB TD-CILOP-343786-GO-DIR / Component 3: Strengthening Acquisition des tablettes, Enr Direct - Internation Pending Impl IDA / E0180 recruitment and financing of Post Direct Selection 421,502.00 0.00 2023-04-15 2023-04-20 2023-05-25 2023-11-21 egistreurs et Accumulateurs al ementation teachers d'énergie pour la géolocalisat ion des MC TD-CILOP-345474-GO-RFB / I Component 3: Strengthening mpression des fiches de lect Single Stage - One E Pending Impl IDA / E0180 recruitment and financing of Post Request for Bids Open - National 307,167.00 0.00 2023-06-22 2023-06-27 2023-08-08 2023-09-07 2023-10-12 2024-04-09 ure pour le préscolaire et la p nvelope ementation teachers remière année du primaire (C P 1) TD-CILOP-342957-GO-RFB / Component 4: Capacity buil Acquisition des moyens roula Single Stage - One E Under Imple IDA / E0180 ding, project management, Post Request for Bids Open - National 688,566.00 0.00 2023-03-28 2023-05-04 2023-04-10 2023-05-04 2023-05-22 2023-05-15 2023-06-21 2023-07-26 2024-01-22 nts pour le Projet PARAEB et l nvelope mentation monitoring and evaluation es Responsables des Sous- C omposantes TD-CILOP-343262-GO-RFQ / Component 4: Capacity buil Acquisition des Equipements Single Stage - One E Under Imple IDA / V4050 ding, project management, Post Request for Bids Open - National 114,483.00 0.00 2023-03-28 2023-02-24 2023-04-02 2023-05-05 2023-05-14 2023-03-09 2023-06-13 2023-07-18 2024-01-14 Informatiques pour le PARAE nvelope mentation monitoring and evaluation B et les Sous Composantes NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TD-CILOP-342641-NC-DIR / L Component 4: Capacity buil oyer bureau PARAEB pour un Request for Quota Single Stage - One E Pending Impl IDA / V4050 ding, project management, Post Limited 71,672.00 0.00 2023-02-17 2023-03-01 2024-02-29 e période d'un an, du 1er Ma tions nvelope ementation monitoring and evaluation rs 2023 au 28 Février 2024 TD-CILOP-342648-NC-RFQ / Component 4: Capacity buil Request for Quota Single Stage - One E Pending Impl Assurance maladie du person IDA / V4050 ding, project management, Post Limited 52,218.00 0.00 2023-03-09 2023-03-19 2024-03-18 tions nvelope ementation nel PARAEB année 2023 monitoring and evaluation TD-CILOP-342662-NC-RFQ / Component 4: Capacity buil Request for Quota Single Stage - One E Pending Impl Assurance tous risques véhic IDA / V4050 ding, project management, Post Limited 25,256.00 0.00 2023-07-08 2023-08-21 2024-08-20 tions nvelope ementation ules PARAEB monitoring and evaluation TD-CILOP-343369-NC-RFQ / Component 4: Capacity buil Request for Quota Single Stage - One E Pending Impl Frais d'entretien du Groupe d IDA / E0180 ding, project management, Post Limited 3,072.00 0.00 2023-04-08 2023-04-29 2024-04-28 tions nvelope ementation e PARAEB pour une période d monitoring and evaluation e 12 mois. Page 1 TD-CILOP-343591-NC-RFQ / Achat des Routeurs, des créd Component 4: Capacity buil Request for Quota Single Stage - One E Pending Impl its d'appel et de connexion in IDA / E0180 ding, project management, Post Limited 64,096.00 0.00 2023-03-11 2023-03-25 2024-03-24 tions nvelope ementation ternet pour le personnel du P monitoring and evaluation ARAEB et les Responsables d es Sous- Composantes TD-CILOP-343644-NC-RFQ / Component 4: Capacity buil Achat de deux logiciels (TOM Request for Quota Single Stage - One E Pending Impl IDA / V4050 ding, project management, Post Limited 33,348.00 0.00 2023-02-25 2023-03-07 2023-03-14 2PRO et TOM2Monitoring; pa tions nvelope ementation monitoring and evaluation ramétrage et formation des u tilisateurs TD-CILOP-345470-NC-DIR / T Component 2: Improving acc Pending Impl est physico-chimique et bact IDA / E0180 Post Direct Selection Direct - National 34,130.00 0.00 2023-04-03 2023-04-08 2023-05-13 2023-11-09 ess to learning ementation ériologique dans un laboratoi re TD-CILOP-346693-NC-RFQ / Component 4: Capacity buil Frais de gardiennage des loc Request for Quota Single Stage - One E Pending Impl IDA / E0180 ding, project management, Post Limited 4,808.00 0.00 2023-03-01 2023-03-01 2023-05-30 aux du PARAEB pour une péri tions nvelope ementation monitoring and evaluation ode de trois (3) mois. TD-CILOP-346760-NC-RFQ / Component 4: Capacity buil Request for Quota Single Stage - One E Pending Impl Nettoyage des bureaux du P IDA / E0180 ding, project management, Post Limited 1,536.00 0.00 2023-03-02 2023-03-02 2023-05-31 tions nvelope ementation ARAEB pour trois mois monitoring and evaluation CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TD-CILOP-337670-CS-CQS / Recrutement d'un consultant Component 4: Capacity buil pour l'élaboration du manuel Consultant Qualifi Pending Impleme IDA / V4050 ding, project management, Post Limited 27,000.00 0.00 2022-08-14 2022-08-28 2022-08-29 2022-09-27 2022-10-27 des procédures administrativ cation Selection ntation monitoring and evaluation es, financières, comptables e t de la passation des marché s TD-CILOP-337667-CS-CQS / Component 4: Capacity buil Consultant Qualifi Pending Impleme Recrutement d'un consultant IDA / V4050 ding, project management, Post Limited 34,130.00 0.00 2022-08-14 2022-08-28 2022-09-27 2022-11-01 2023-04-30 cation Selection ntation pour l'élaboration du manuel monitoring and evaluation d'exécution TD-CILOP-342917-CS-QCBS / Recrutement d'un cabinet po Component 3: Strengthening Quality And Cost- Pending Impleme ur l'élaboration de la politiqu IDA / E0180 recruitment and financing of Post Open - National 136,519.00 0.00 2023-03-20 2023-04-10 2023-05-24 2023-06-21 2023-07-21 2023-08-25 2023-09-29 2024-09-28 Based Selection ntation e/plan budgétisé pour l'intégr teachers ations des MC à la paie (CCB P1 TD-CILOP-338586-CS-CQS / Component 4: Capacity buil Recrutement d'un Consultant Consultant Qualifi Pending Impleme IDA / V4050 ding, project management, Post Limited 30,000.00 0.00 2022-08-14 2022-08-28 2022-09-11 2022-10-10 2022-11-09 pour l'élaboration du Plan de cation Selection ntation monitoring and evaluation Gestion de Sécurité (PGS) TD-CILOP-342901-CS-QCBS / Recrutement d'un Consultant Component 2: Improving acc Consultant Qualifi Pending Impleme IDA / E0180 Post Open - National 18,430.00 0.00 2023-04-10 2023-04-15 2023-04-18 2023-05-11 2023-06-04 2023-12-01 pour la conception d'un mod ess to learning cation Selection ntation èle d'enseignement au nivea u TD-CILOP-342684-CS-QCBS / Component 1: Strengthening Consultant Qualifi Pending Impleme Recrutement d'un Cabinet po IDA / E0180 Post Open - National 18,430.00 0.00 2023-04-10 2023-05-01 2023-06-14 2023-07-14 2023-08-18 2024-02-14 the quality of teaching cation Selection ntation ur la révision du curricula TD-CILOP-342694-CS-QCBS / Recrutement d'un cabinet afi Component 1: Strengthening Consultant Qualifi Pending Impleme IDA / E0180 Post Limited 18,430.00 0.00 2023-04-17 2023-05-01 2023-05-31 2023-07-05 2024-01-01 n de renforcer les politiques the quality of teaching cation Selection ntation , le contenu et les procédure s existantes TD-CILOP-342899-CS-QCBS / Component 1: Strengthening Consultant Qualifi Pending Impleme Recrutement d'un bureau de IDA / E0180 Post Limited 37,543.00 0.00 2023-07-03 2023-07-17 2023-08-16 2023-09-20 2024-03-18 the quality of teaching cation Selection ntation contrôle de la qualité des tra vaux TD-CILOP-342985-CS-CDS / Component 4: Capacity buil Consultant Qualifi Pending Impleme Audit des comptes du fonds IDA / E0180 ding, project management, Post Limited 10,239.00 0.00 2023-04-03 2023-04-10 2023-04-17 2023-04-25 2023-05-25 cation Selection ntation de préparation monitoring and evaluation TD-CILOP-342725-CS-QCBS / Recrutement d'un OSC pour l Component 1: Strengthening Quality And Cost- Pending Impleme IDA / E0180 Post Open - National 153,584.00 0.00 2023-04-21 2023-05-12 2023-06-25 2023-07-23 2023-08-22 2023-09-26 2023-10-31 2024-10-30 'organisation une campagne the quality of teaching Based Selection ntation de mobilisation sociale en fa veur de la lecture TD-CILOP-363298-CS-CQS / Recrutement d’un (e) Consult ant(e) international(e) en cha Component 1: Strengthening Consultant Qualifi Open - Internationa Pending Impleme rge d’appuyer le Comité Nati IDA / E0180 Post 18,430.00 0.00 2023-05-24 2023-06-14 2023-07-28 2023-08-27 2023-10-01 2024-03-29 the quality of teaching cation Selection l ntation onal Technique de Littératie pour l’élaboration et l’expéri mentation d’un paquet curric ulaire TD-CILOP-367212-CS-CQS / Recrutement d'un Consultant Component 4: Capacity buil Consultant Qualifi Pending Impleme en appui au Ministère de la P IDA / E0180 ding, project management, Post Limited 30,716.00 0.00 2023-06-14 2023-06-28 2023-07-28 2023-09-01 2024-02-28 cation Selection ntation rospective Economique et de monitoring and evaluation s Partenariats Internationaux INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TD-CILOP-292270-CS-CDS / Component 4: Capacity buil Recrutement d'un cabinet po Under Implement IDA / V4050 ding, project management, Post Direct Selection Direct 25,000.00 0.00 2022-04-25 2022-08-12 2022-05-05 2022-06-09 2022-07-09 ur le recrutement du personn ation monitoring and evaluation el de l’Unité de Gestion du P AREAB TD-CILOP-342991-CS-CDS / Component 4: Capacity buil Recrutement d'un Cabinet po Pending Impleme IDA / E0180 ding, project management, Post Direct Selection Direct - National 11,945.00 0.00 2023-03-10 2023-03-20 2023-05-24 2023-11-20 ur le recrutement du personn ntation monitoring and evaluation el additionnel du PARAEB Page 2 TD-CILOP-343021-CS-CDS / Component 4: Capacity buil Assistance technique nationa Pending Impleme IDA / E0180 ding, project management, Post Direct Selection Direct - National 13,652.00 0.00 2023-05-02 2023-05-12 2023-07-16 2024-01-12 le pour le renforcement de c ntation monitoring and evaluation apacité des partenaires TD-CILOP-343025-CS-CDS / Recrutement d'un consultant pour l'évaluation de la situati Component 4: Capacity buil on de référence (Baseline) de Pending Impleme IDA / E0180 ding, project management, Post Direct Selection Direct - National 23,038.00 0.00 2023-06-01 2023-06-11 2023-08-15 2024-02-11 s indicateurs du Cadre de Ré ntation monitoring and evaluation sultats du Projet et élaboratio n de la section de suivi-évalu ation du manuel d'exécution du projet. TD-CILOP-343138-CS-CDS / Recrutement d'un Consultant Component 4: Capacity buil pour l'évaluation des équipe IDA / E0180 ding, project management, Post Direct Selection Direct - National 14,932.00 0.00 Under Review 2023-06-01 2023-06-13 2023-06-11 2023-08-15 2024-02-11 ments pour l'installation intr monitoring and evaluation anet au sein MENPC pour con necter tous les services au ni veau central TD-CILOP-360244-CS-CDS / Recensement de tous les éta blissements scolaires publics, Component 3: Strengthening communautaires et privés du Pending Impleme IDA / E0180 recruitment and financing of Prior Direct Selection Direct - National 2,901,024.00 0.00 2023-05-15 2023-05-25 2023-07-29 2024-01-25 Préscolaire, du Primaire, du S ntation teachers econdaire et de l’Enseignem ent Technique et Professionn elle y compris les entités liée s aux établissements Page 3 PROCUREMENT PLAN Project information: México – Strengthening Entrepreneurship in Productive Forest Landscapes P 164661 Project Implementation agency: COMISION NACIONAL FORESTAL - CONAFOR Date of the Procurement Plan: 08/15/2018 Period covered by this Procurement Plan: 08/15/2018-12/30/2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in armonized documents, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: “Not Applicable” Works: “Not Applicable” Other Relevant Procurement Information. For Subprojects, Bank has agreed to use CDD arrangements accepting to follow Conafor Operational Rules accordingly to activities detailed in the Operational Manual. PROCUREMENT Mexico : Strengthening Entrepreneurship in Productive Forest Landscapes PLAN General Information Country: Mexico 2020-01-28 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank 2023-05-22 if none) Project ID: P164661 GPN Date: 2018-06-22 Project Name: Strengthening Entrepreneurship in Productive Forest Landscapes Loan / Credit No: TF / A6448, TF / A6533 Comision Nacional Forestal Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Comple Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes tion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MX-CONAFOR-152669-NC-RF Q / Arrendamiento de la nube de Amazon Web Services (A Institutional Development an Request for Quota Single Stage - One E TF / A6448 Post Open - National 25,421.44 16,198.70 Signed 2020-01-28 2020-02-11 2020-06-02 2020-12-31 WS) para la operación del sof d Facilitation Support tions nvelope tware Monitoring Activity Dat a for Mexico en la CONAFOR. MX-CONAFOR-253011-NC-RF Q / "Arrendamiento de la nub e Amazon Web Services (AW Institutional Development an Request for Quota Single Stage - One E TF / A6448 Post Open - National 32,290.80 31,552.58 Completed 2021-09-27 2021-10-18 2021-12-04 2021-11-30 2022-11-03 S) para la operación del soft d Facilitation Support tions nvelope ware Monitoring Activity Data for México en la CONAFOR" (f ase II) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MX-CONAFOR-246995-CS-CQ S / CONSULTORIA PARA EL U Strengthening Forest Manag SO DE ESTIMULANTES DE BAJ Consultant Qualifi Pending Impleme TF / A6533 ement, Conservation, and Bu Post Open - National 90,204.31 0.00 2021-08-30 2021-09-20 2021-10-08 2021-10-18 2021-11-01 2023-03-31 A TOXICIDAD PARA INCREME cation Selection ntation siness Development NTAR LOS RENDIMIENTOS DE LA PRODUCCIÓN DE RESINA DE PINO EN MEXICO INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MX-CONAFOR-152627-CS-CD S / Contratación de un especi alista para Asistencia y coord Institutional Development an Individual Consult TF / A6448 Post Direct 46,288.20 42,506.62 Completed 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-30 2020-02-18 2020-12-15 2020-12-16 inación de la Unidad Técnica d Facilitation Support ant Selection Especializada en Monitoreo, Reporte y Verificación ejercici o 2020. MX-CONAFOR-152665-CS-CD S / Contratación de un especi alista para Asistencia en el te Institutional Development an Individual Consult TF / A6448 Post Direct 28,555.56 24,724.80 Completed 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-30 2020-02-18 2020-12-15 2020-12-16 ma de Reporte y Registro de d Facilitation Support ant Selection la Unidad Técnica Especializa da en Monitoreo, Reporte y V erificación ejercicio 2020. MX-CONAFOR-152663-CS-CD S / Contratación de un especi alista para Asistencia en el te Institutional Development an Individual Consult TF / A6448 Post Direct 28,555.56 24,724.80 Completed 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-30 2020-02-18 2020-12-15 2020-12-16 ma de Datos de Actividad de d Facilitation Support ant Selection la Unidad Técnica Especializa da en Monitoreo, Reporte y V erificación ejercicio 2020. MX-CONAFOR-152664-CS-CD S / Contratación de un especi alista para Asistencia en el te Institutional Development an Individual Consult TF / A6448 Post Direct 28,555.56 24,724.80 Completed 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-30 2020-02-18 2020-12-15 2020-12-16 ma de Factores de Emisión d d Facilitation Support ant Selection e la Unidad Técnica Especiali zada en Monitoreo, Reporte y Verificación ejercicio 2020. MX-CONAFOR-152667-CS-CD S / Contratación de un especi alista para Asistencia especia Institutional Development an Individual Consult lizada en Programación y Red TF / A6448 Post Direct 18,034.74 15,615.36 Completed 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-30 2020-02-18 2020-12-15 2020-12-16 d Facilitation Support ant Selection es de la Unidad Técnica Espe cializada en Monitoreo, Repor te y Verificación ejercicio 20 20. MX-CONAFOR-152668-CS-CD S / Contratación de un especi alista para Asistencia especia Institutional Development an Individual Consult lizada en Métodos Estadístico TF / A6448 Post Direct 19,307.05 16,716.99 Completed 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-30 2020-02-18 2020-12-15 2020-12-16 d Facilitation Support ant Selection s de la Unidad Técnica Especi alizada en Monitoreo, Report e y Verificación ejercicio 202 0. Page 1 MX-CONAFOR-152666-CS-CD S / Contratación de un especi alista para Asistencia especia lizada en SIG e IEGEI en el Se Institutional Development an Individual Consult TF / A6448 Post Direct 19,307.05 16,716.99 Completed 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-29 2020-02-14 2020-01-30 2020-02-18 2020-12-15 2020-12-16 ctor Uso del Suelo, Cambio d d Facilitation Support ant Selection e Uso del Suelo y Silvicultura de la Unidad Técnica Especial izada en Monitoreo, Reporte y Verificación ejercicio 2020. FEPPF-090-SD-CI-GSNMF / Co ntratación de un especialista Institutional Development an Individual Consult para Asistencia y coordinació TF / A6448 Post Direct 50,116.80 43,489.02 Signed 2019-01-23 2019-02-07 2019-01-25 2019-02-07 2019-01-28 2019-02-07 2019-02-01 2019-02-08 2019-12-15 2019-12-16 d Facilitation Support ant Selection n de la Unidad Técnica Espec ializada en Monitoreo, Report e y Verificación (fase II) FEPPF-092-SD-CI-GSNMF / Co ntratación de un especialista para Asistencia en el tema de Institutional Development an Individual Consult TF / A6448 Post Direct 31,432.04 27,275.26 Completed 2019-01-23 2019-02-07 2019-01-25 2019-02-07 2019-01-28 2019-02-07 2019-02-01 2019-02-08 2019-12-15 2020-01-01 Factores de Emisión de la Uni d Facilitation Support ant Selection dad Técnica Especializada en Monitoreo, Reporte y Verifica ción (fase II) FEPPF-093-SD-CI-GSNMF / Co ntratación de un especialista para Asistencia en el tema de Institutional Development an Individual Consult TF / A6448 Post Direct 31,432.04 27,275.26 Completed 2019-01-23 2019-02-07 2019-01-25 2019-02-07 2019-01-28 2019-02-07 2019-02-01 2019-02-08 2019-12-15 2020-01-01 Reporte y Registro de la Unid d Facilitation Support ant Selection ad Técnica Especializada en Monitoreo, Reporte y Verifica ción (fase II) FEPPF-094-SD-CI-GSNMF / Co ntratación de un especialista para Asistencia especializada en SIG e IEGEI* en el Sector Institutional Development an Individual Consult TF / A6448 Post Direct 31,432.04 19,157.12 Completed 2019-01-23 2019-02-07 2019-01-25 2019-02-07 2019-01-28 2019-02-07 2019-02-01 2019-02-08 2019-12-15 2020-01-01 Uso del Suelo, Cambio de Us d Facilitation Support ant Selection o del Suelo y Silvicultura de l a Unidad Técnica Especializa da en Monitoreo, Reporte y V erificación (fase II) FEPPF-095-SD-CI-GSNMF / Co ntratación de un especialista para Asistencia especializada Institutional Development an Individual Consult TF / A6448 Post Direct 22,076.69 16,532.35 Completed 2019-01-23 2019-02-07 2019-01-25 2019-02-07 2019-01-28 2019-02-07 2019-02-01 2019-02-08 2019-12-15 2020-01-01 en Programación y Redes de d Facilitation Support ant Selection la Unidad Técnica Especializa da en Monitoreo, Reporte y V erificación (fase II) FEPPF-096-SD-CI-GSNMF / Co ntratación de un especialista para Asistencia especializada Institutional Development an Individual Consult TF / A6448 Post Direct 19,051.90 16,532.35 Completed 2019-01-23 2019-02-07 2019-01-25 2019-02-07 2019-01-28 2019-02-07 2019-02-01 2019-02-08 2019-12-15 2020-01-01 en Métodos Estadísticos de la d Facilitation Support ant Selection Unidad Técnica Especializada en Monitoreo, Reporte y Verif icación (fase II) FEPPF-091-SD-CI-GSNMF / Co ntratación de un especialista para Asistencia en el tema de Institutional Development an Individual Consult TF / A6448 Post Direct 32,502.74 27,275.26 Completed 2019-01-23 2019-02-07 2019-01-25 2019-02-07 2019-01-28 2019-02-07 2019-02-01 2019-02-08 2019-12-15 2020-01-01 Datos de Actividad de la Unid d Facilitation Support ant Selection ad Técnica Especializada en Monitoreo, Reporte y Verifica ción (fase II) MX-CONAFOR-207047-CS-CD S / Contratación de un especi alista para asistencia en el se guimiento al manejo financie Institutional Development an Individual Consult TF / A6448 Post Direct 33,629.19 12,968.70 Signed 2021-01-18 2020-02-11 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 ro de los proyectos de la CON d Facilitation Support ant Selection AFOR financiados mediante c rédito externo (IFR, EFA, des embolsos, conciliaciones, seg uimiento financiero) . MX-CONAFOR-207048-CS-CD S / Contratación de un especi alista para asistencia en el se Institutional Development an Individual Consult guimiento del financiamiento TF / A6448 Post Direct 30,037.72 11,583.69 Signed 2021-01-18 2021-02-09 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 d Facilitation Support ant Selection externo de la CONAFOR (infor mes de avances, marco de re sultados, misiones, comprom isos contractuales y acuerdos ) MX-CONAFOR-207051-CS-CD S / Contratación de un especi alista para la asistencia en la Institutional Development an Individual Consult TF / A6448 Post Direct 35,261.67 13,106.00 Terminated 2021-01-18 2021-02-09 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 s adquisiciones y contratacio d Facilitation Support ant Selection nes de los proyectos de la CO NAFOR financiados mediante crédito externo. MX-CONAFOR-207050-CS-CD S / Especialista para brindar Asistencia Técnica para el S eguimiento a las auditorías e Institutional Development an Individual Consult xternas y apoyo al control pr TF / A6448 Post Direct 29,058.23 10,892.31 Signed 2021-01-18 2021-02-11 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 d Facilitation Support ant Selection esupuestal de los proyectos financiados con crédito exter no (Contratación y coordinaci ón con las gerencias centrale s y estatales ) MX-CONAFOR-207052-CS-CD S / Contratación de un especi alista para Asistencia y Coor Institutional Development an Individual Consult TF / A6448 Post Direct 99,255.08 38,276.55 Terminated 2021-01-18 2021-02-10 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 dinación de la Unidad Técnic d Facilitation Support ant Selection a Especializada en Monitoreo, Reporte y Verificación (FASE V). MX-CONAFOR-207053-CS-CD S / Contratación de un especi alista para Asistencia en el te Institutional Development an Individual Consult TF / A6448 Post Direct 61,231.25 23,613.11 Signed 2021-01-18 2021-02-11 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 ma de Datos de Actividad de d Facilitation Support ant Selection la Unidad Técnica Especializa da en Monitoreo, Reporte y V erificación (FASE V). MX-CONAFOR-207054-CS-CD S / Contratación de un especi alista para Asistencia en el te Institutional Development an Individual Consult TF / A6448 Post Direct 61,231.25 23,613.11 Completed 2021-01-18 2021-02-10 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 2021-12-16 ma de Factores de Emisión d d Facilitation Support ant Selection e la Unidad Técnica Especiali zada en Monitoreo, Reporte y Verificación (FASE V). MX-CONAFOR-207055-CS-CD S / Contratación de un especi alista para Asistencia en el te Institutional Development an Individual Consult TF / A6448 Post Direct 61,231.25 23,613.11 Terminated 2021-01-18 2021-02-09 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 ma de Reporte y Registro de d Facilitation Support ant Selection la Unidad Técnica Especializa da en Monitoreo, Reporte y V erificación (FASE V). Page 2 MX-CONAFOR-207056-CS-CD S / Contratación de un especi alista para Asistencia especia lizada en SIG e IEGEi en el Se Institutional Development an Individual Consult TF / A6448 Post Direct 41,399.82 15,965.35 Signed 2021-01-18 2021-02-11 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 ctor Uso del Suelo, Cambio d d Facilitation Support ant Selection e Uso del Suelo y Silvicultura de la Unidad Técnica Especial izada en Monitoreo, Reporte y Verificación (FASE V). MX-CONAFOR-207057-CS-CD S / Contratación de un especi alista para Asistencia especia Institutional Development an Individual Consult TF / A6448 Post Direct 38,671.61 14,913.25 Completed 2021-01-18 2021-02-10 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 2021-12-16 lizada en Programación y Red d Facilitation Support ant Selection es de la Unidad Técnica Espe cializada en Monitoreo, Repor te y Verificación (FASE V). MX-CONAFOR-207058-CS-CD S / Contratación de un especi alista para Asistencia especia Institutional Development an Individual Consult TF / A6448 Post Direct 41,399.82 15,965.35 Signed 2021-01-18 2021-02-10 2021-01-18 2021-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-17 2023-03-31 lizada en Métodos Estadístico d Facilitation Support ant Selection s de la Unidad Técnica Especi alizada en Monitoreo, Report e y Verificación (FASE V). MX-CONAFOR-207059-CS-IN DV / Consultor individual de a poyo técnico al INECC y a CO NAFOR para coordinar la inte Institutional Development an Individual Consult TF / A6448 Post Limited 40,943.03 0.00 Canceled 2021-03-22 2021-03-24 2021-03-29 2021-04-16 2022-10-15 gración del Inventario de Gas d Facilitation Support ant Selection es de Efecto Invernadero par a el sector agricultura, silvicu ltura y otros usos del suelo p ara el ISFL-ERPD. MX-CONAFOR-207060-CS-IN DV / Consultor individual de a poyo técnico al INECC y a CO Institutional Development an Individual Consult NAFOR para la elaboración d TF / A6448 Post Limited 27,682.50 0.00 Canceled 2021-03-22 2021-03-24 2021-03-29 2021-04-16 2022-10-15 d Facilitation Support ant Selection el Inventario de Gases de Efe cto Invernadero para la categ oría 3A Ganado sensu IPCC p ara el ISFL-ERPD. MX-CONAFOR-207061-CS-IN DV / Consultor individual de a poyo técnico al INECC y a CO Institutional Development an Individual Consult NAFOR para la elaboración d TF / A6448 Post Limited 27,682.50 0.00 Canceled 2021-03-22 2021-03-24 2021-03-29 2021-04-16 2022-10-15 d Facilitation Support ant Selection el Inventario de Gases de Efe cto Invernadero para la categ oría agrícola 3C sensu IPCC p ara el ISFL-ERPD. MX-CONAFOR-207062-CS-CD S / Contratación de un especi alista para Asistencia especia Institutional Development an Individual Consult lizada en Bases de Datos del TF / A6448 Post Direct 33,300.51 12,309.58 Signed 2021-03-22 2021-04-16 2021-03-23 2021-03-31 2021-03-24 2021-03-31 2021-04-01 2021-04-22 2023-03-31 d Facilitation Support ant Selection Sistema de Estimación de Bio masa y Carbono de la Unidad Técnica Especializada en Mon itoreo, Reporte y Verificación. MX-CONAFOR-207063-CS-CD S / Consultor individual para l a interpretación visual de im Institutional Development an Individual Consult TF / A6448 Post Direct 31,437.54 11,620.93 Signed 2021-03-22 2021-04-16 2021-03-23 2021-03-31 2021-03-24 2021-03-31 2021-04-01 2021-04-22 2023-03-31 ágenes satelitales para el pos d Facilitation Support ant Selection t-procesamiento de producto s del Sistema SAMOF en la R egión Norte de México. MX-CONAFOR-207064-CS-CD S / Consultor individual para l a interpretación visual de im Institutional Development an Individual Consult TF / A6448 Post Direct 31,437.54 11,620.93 Signed 2021-03-22 2021-04-16 2021-03-23 2021-03-31 2021-03-24 2021-03-31 2021-04-01 2021-04-22 2023-03-31 ágenes satelitales para el pos d Facilitation Support ant Selection t-procesamiento de producto s del Sistema SAMOF en la R egión Noreste de México. MX-CONAFOR-207065-CS-CD S / Consultor individual para l a interpretación visual de im Institutional Development an Individual Consult TF / A6448 Post Direct 31,437.54 11,620.93 Signed 2021-03-22 2021-04-16 2021-03-23 2021-03-31 2021-03-24 2021-03-31 2021-04-01 2021-04-22 2023-03-31 ágenes satelitales para el pos d Facilitation Support ant Selection t-procesamiento de producto s del Sistema SAMOF en la R egión Noroeste de México. MX-CONAFOR-207066-CS-CD S / Consultor individual para l a interpretación visual de im Institutional Development an Individual Consult TF / A6448 Post Direct 31,437.54 11,542.03 Signed 2021-03-22 2021-04-16 2021-03-23 2021-03-31 2021-03-24 2021-03-31 2021-04-01 2021-04-22 2023-03-31 ágenes satelitales para el pos d Facilitation Support ant Selection t-procesamiento de producto s del Sistema SAMOF en la R egión Centro de México. MX-CONAFOR-207067-CS-CD S / Consultor individual para l a interpretación visual de im Institutional Development an Individual Consult TF / A6448 Post Direct 31,437.54 11,542.03 Signed 2021-03-22 2021-04-16 2021-03-23 2021-03-31 2021-03-24 2021-03-31 2021-04-01 2021-04-22 2023-03-31 ágenes satelitales para el pos d Facilitation Support ant Selection t-procesamiento de producto s del Sistema SAMOF en la R egión Sur de México. MX-CONAFOR-207068-CS-CD S / Consultor individual para l a interpretación visual de im Institutional Development an Individual Consult TF / A6448 Post Direct 31,437.54 11,542.03 Signed 2021-03-22 2021-04-16 2021-03-23 2021-03-31 2021-03-24 2021-03-31 2021-04-01 2021-04-22 2023-03-31 ágenes satelitales para el pos d Facilitation Support ant Selection t-procesamiento de producto s del Sistema SAMOF en la R egión Sureste de México. MX-CONAFOR-207069-CS-IN DV / Contratación de una con sultoría líder para la elaborac Institutional Development an Individual Consult TF / A6448 Post Limited 57,256.50 59,797.27 Signed 2021-04-12 2021-05-31 2021-04-19 2021-05-14 2021-04-26 2021-05-14 2021-05-17 2021-06-15 2022-07-29 ión del Programa de Reducci d Facilitation Support ant Selection ón de Emisiones en los estad os de Coahuila, Chihuahua, D urango y Nuevo León. MX-CONAFOR-207070-CS-IN DV / Contratación de una con sultoría para la identificación de causas subyacentes/direct Institutional Development an Individual Consult as relacionadas con la pérdid TF / A6448 Post Limited 19,262.07 20,116.83 Completed 2021-04-12 2021-09-17 2021-04-19 2021-08-16 2021-04-26 2021-08-16 2021-05-17 2021-09-23 2021-10-15 2021-12-16 d Facilitation Support ant Selection a de la cobertura forestal, la degradación del ecosistema f orestal y las emisiones de Ga ses de Efecto Invernadero en el sector de la... MX-CONAFOR-207071-CS-IN DV / Consultor individual par a dirigir y coordinar las accio nes que se implementen en l Institutional Development an Individual Consult Under Implement TF / A6448 Post Limited 105,098.67 0.00 2021-04-12 2022-05-26 2021-04-19 2021-04-26 2021-05-17 2023-03-31 os componentes del proyecto d Facilitation Support ant Selection ation y que esté en permanente co municación con las Gerencias a nivel central y en los estad os del proyecto. Page 3 MX-CONAFOR-207072-CS-IN DV / Consultor individual par Institutional Development an Individual Consult Under Implement a integrar los aspectos de pr TF / A6448 Post Limited 43,339.66 0.00 2021-04-12 2022-05-13 2021-04-19 2021-04-26 2021-05-17 2023-03-31 d Facilitation Support ant Selection ation oducción y productividad en el marco del proyecto PFEPPF . MX-CONAFOR-207073-CS-IN DV / Consultor individual par Institutional Development an Individual Consult TF / A6448 Post Limited 43,339.66 19,110.99 Signed 2021-04-12 2022-02-24 2021-04-19 2021-10-22 2021-04-26 2021-10-22 2021-05-17 2022-03-01 2023-03-31 a integrar los aspectos de res d Facilitation Support ant Selection tauración forestal en el marc o del proyecto PFEPPF. MX-CONAFOR-207074-CS-IN DV / Consultor individual par Institutional Development an Individual Consult TF / A6448 Post Limited 43,339.66 10,021.37 Signed 2021-04-12 2021-07-09 2021-04-19 2021-06-25 2021-04-26 2021-06-25 2021-05-17 2021-07-17 2023-03-31 a integrar los aspectos de bio d Facilitation Support ant Selection diversidad en el marco del pr oyecto PFEPPF. MX-CONAFOR-207076-CS-IN DV / Consultor individual par Institutional Development an Individual Consult TF / A6448 Post Limited 43,339.66 4,008.55 Signed 2021-04-12 2021-10-07 2021-04-19 2021-07-20 2021-04-26 2021-10-05 2021-05-17 2021-10-16 2023-03-31 a las actividades de seguimie d Facilitation Support ant Selection nto y evaluación del Proyecto PFEPPF. MX-CONAFOR-207077-CS-IN DV / Consultor individual esp Institutional Development an Individual Consult ecialista de salvaguardas del TF / A6448 Post Limited 43,339.66 10,021.37 Signed 2021-04-12 2021-07-19 2021-04-19 2021-06-25 2021-04-26 2021-06-25 2021-05-17 2021-07-27 2023-03-31 d Facilitation Support ant Selection proyecto “Fortalecimiento E mpresarial en Paisajes Produ ctivos”. MX-CONAFOR-207078-CS-IN DV / Consultor individual de a poyo para la estimación de fl Institutional Development an Individual Consult TF / A6448 Post Limited 51,928.37 7,073.83 Signed 2021-04-12 2021-09-10 2021-04-15 2021-09-01 2021-04-16 2021-09-01 2021-05-03 2021-09-21 2023-03-31 ujos y modelación de gases d d Facilitation Support ant Selection e efecto invernadero en el se ctor forestal a nivel subnacio nal. MX-CONAFOR-207049-CS-CD S / Especialista para el segui miento y monitoreo de aspec tos fiduciarios del financiami Institutional Development an Individual Consult ento internacional, el control, TF / A6448 Post Direct 29,058.23 11,205.96 Signed 2021-01-18 2021-02-09 2021-01-18 2022-01-22 2021-01-22 2021-01-22 2021-02-01 2021-02-28 2023-03-31 d Facilitation Support ant Selection organización y sistematizació n de la información del Proye cto (gestiones administrativa s en la implementación, contr ol documental) MX-CONAFOR-207079-CS-IN DV / Contratación de un espe cialista para el análisis y cont Institutional Development an Individual Consult TF / A6448 Post Limited 22,827.47 2,395.11 Signed 2021-07-28 2021-10-14 2021-07-30 2021-09-14 2021-08-05 2021-09-14 2021-08-16 2021-10-20 2023-03-31 rol de calidad de datos geoes d Facilitation Support ant Selection paciales del Sistema Satelital de Monitoreo Forestal (SAMO F) MX-CONAFOR-207080-CS-IN DV / Contratación de un espe cialista para la gestión y cont Institutional Development an Individual Consult TF / A6448 Post Limited 14,804.43 1,154.23 Signed 2021-07-28 2021-11-04 2021-07-30 2021-10-15 2021-08-05 2021-10-15 2021-08-16 2021-11-09 2023-03-31 rol de calidad de bases de da d Facilitation Support ant Selection tos geoespaciales del Sistem a Satelital de Monitoreo Fore stal (SAMOF) MX-CONAFOR-237975-CS-IN DV / Consultor individual de a poyo técnico a la CONAFOR p Institutional Development an Individual Consult ara el análisis de tenencia de TF / A6448 Post Limited 22,621.36 0.00 Canceled 2021-07-28 2021-07-30 2021-08-05 2021-08-16 2022-02-15 d Facilitation Support ant Selection la tierra y recursos, así como de la capacidad para realizar transacción de Emisiones Re ducidas para el ISFL-ERPD MX-CONAFOR-207081-CS-IN DV / Contratación de un espe cialista para Asistencia en el Institutional Development an Individual Consult TF / A6448 Post Limited 45,712.88 8,222.41 Signed 2021-08-03 2021-09-02 2021-08-06 2021-08-20 2021-08-09 2021-08-20 2021-08-16 2021-09-08 2023-03-31 tema de Reporte y Registro d d Facilitation Support ant Selection e la Unidad Técnica Especiali zada en Monitoreo, Reporte y Verificación (FASE VI). MX-CONAFOR-246975-CS-IN DV / Consultor individual de a poyo para la compilación de Institutional Development an Individual Consult productos intermedios y final TF / A6448 Post Limited 8,664.63 8,695.50 Completed 2021-08-23 2021-10-22 2021-08-26 2021-10-05 2021-08-30 2021-10-05 2021-09-06 2021-11-08 2022-03-15 2022-05-23 d Facilitation Support ant Selection es del inventario de GEI en el sector USCUSS para el ISFL y apoyo para su integración en el ERPD MX-CONAFOR-254917-CS-IN DV / Consultor individual de a poyo técnico a la CONAFOR p Institutional Development an Individual Consult ara el análisis de tenencia de TF / A6448 Post Direct 22,463.16 22,548.08 Signed 2021-09-28 2021-10-01 2021-09-30 2021-09-27 2021-10-01 2021-09-27 2021-10-05 2021-10-06 2022-04-04 d Facilitation Support ant Selection la tierra y recursos, así como de la capacidad para realizar transacción de Emisiones Re ducidas para el ISFL-ERPD MX-CONAFOR-256763-CS-IN DV / Contratación de una con Institutional Development an Individual Consult TF / A6533 Post Limited 16,039.11 16,535.26 Signed 2021-10-13 2021-12-02 2021-10-18 2021-11-22 2021-10-21 2021-11-22 2021-11-01 2021-12-07 2022-09-30 sultoría para la elaboración d d Facilitation Support ant Selection el Plan de Distribución de Be neficios (PDB). MX-CONAFOR-267790-CS-IN Strengthening Forest Manag Individual Consult Pending Impleme DV / ESTUDIO SOBRE EL MAN TF / A6533 ement, Conservation, and Bu Post Open 38,217.17 0.00 2021-12-17 2022-01-28 2022-02-10 2022-03-01 2023-03-31 ant Selection ntation EJO DE ACAHUALES siness Development MX-CONAFOR-272640-CS-IN DV / Contratación de un espe cialista para Asistencia en el Institutional Development an Individual Consult Under Implement TF / A6448 Post Limited 30,958.09 0.00 2022-01-21 2022-05-31 2022-01-28 2022-02-07 2022-02-16 2023-03-31 tema de Factores de Emisión d Facilitation Support ant Selection ation de la Unidad Técnica Especial izada en Monitoreo, Reporte y Verificación (FASE VI) MX-CONAFOR-276654-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 83,299.76 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Chihuahua-ERP D MX-CONAFOR-276652-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Coahuila-ERPD Page 4 MX-CONAFOR-276637-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 83,299.76 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Durango-ERPD MX-CONAFOR-276634-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Nuevo León-ER PD MX-CONAFOR-276635-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2023-01-30 2022-02-15 2022-02-21 2022-03-01 2023-03-31 onal para proporcionar orient d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Oaxaca-PFC MX-CONAFOR-276648-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2022-09-30 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Tabasco-PFC MX-CONAFOR-276643-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2023-01-27 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Veracruz-PFC MX-CONAFOR-276644-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2023-01-26 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Campeche-PFC MX-CONAFOR-276642-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Chiapas-PFC MX-CONAFOR-276636-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 62,474.82 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Michoacán-Gen eral MX-CONAFOR-276633-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Oaxaca-Genera l MX-CONAFOR-276645-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Guerrero-Gener al MX-CONAFOR-276639-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Jalisco-General MX-CONAFOR-276641-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, México-General MX-CONAFOR-276649-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 62,474.82 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Puebla-General MX-CONAFOR-276640-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Quintana Roo- General MX-CONAFOR-276646-CS-IN DV / Consultores Individuales Institutional Development an Individual Consult Regionales para proporcionar TF / A6533 Post Limited 41,649.88 0.00 Canceled 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection orientación especializada y a poyo técnico, Hidalgo/Tlaxcal a-General MX-CONAFOR-276638-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, San Luis Potosí-Gener al MX-CONAFOR-276650-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Campeche-General MX-CONAFOR-276647-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2022-10-24 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Tamaulipas-General MX-CONAFOR-276651-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2023-01-26 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Nayarit-General MX-CONAFOR-276653-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 20,824.94 0.00 2022-02-14 2022-02-15 2022-02-21 2022-03-01 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Veracruz-General Page 5 MX-CONAFOR-285674-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-07-27 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon a B. MX-CONAFOR-285676-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-10-21 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon a D. MX-CONAFOR-285653-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-10-24 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Coahuila-ERPD, Zona A. MX-CONAFOR-285679-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Coahuila-ERPD, Zona B. MX-CONAFOR-285648-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2023-01-27 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Durango-ERPD, Zona A. MX-CONAFOR-285664-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Durango-ERPD, Zona B MX-CONAFOR-285665-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Durango-ERPD, Zona C. MX-CONAFOR-285645-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-05-27 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Nuevo León-ERPD, Zo na A. MX-CONAFOR-285656-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Nuevo León-ERPD, Zo na B. MX-CONAFOR-285660-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chiapas-PFC, Zona A. MX-CONAFOR-285657-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-10-20 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Chiapas-PFC, Zona B. MX-CONAFOR-285673-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Oaxaca-General, Zon a A. MX-CONAFOR-285644-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-08-29 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Michoacán-General, Z ona B MX-CONAFOR-285681-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Michoacán-General, Z ona C. MX-CONAFOR-285670-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Guerrero-General, Zo na A MX-CONAFOR-285651-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Guerrero-General, Zo na B. MX-CONAFOR-285658-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2023-01-27 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Jalisco-General, Zona A. MX-CONAFOR-285654-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-10-24 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Jalisco-General, Zona B. MX-CONAFOR-285669-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-07-26 2022-04-01 2022-07-26 2022-04-07 2022-07-26 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, México-General, Zona B. MX-CONAFOR-285655-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2023-01-27 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Puebla-General, Zona A. Page 6 MX-CONAFOR-285650-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Puebla-General, Zona B. MX-CONAFOR-285667-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2023-01-26 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Puebla-General, Zona C. MX-CONAFOR-285680-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Quintana Roo-Genera l, Zona A. MX-CONAFOR-285652-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Quintana Roo-Genera l, Zona B. MX-CONAFOR-285671-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Hidalgo-General, Zon aA MX-CONAFOR-285675-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Under Implement onal para proporcionar orient TF / A6533 Post Limited 18,459.52 0.00 2022-03-31 2022-10-11 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ation ación especializada y apoyo t écnico, Tlaxcala-General, Zon aA MX-CONAFOR-255391-CS-IN DV / Consultor Individual Esp ecialista en Gestión Ambient Institutional Development an Individual Consult Under Implement al y Social para el Programa TF / A6533 Post Direct 49,157.65 0.00 2022-05-04 2022-05-13 2022-05-06 2022-05-06 2022-05-16 2023-03-31 d Facilitation Support ant Selection ation de Reducción de Emisiones d el Fondo de BioCarbono bajo la Iniciativa de Paisajes Fores tales Sostenibles (ISFL) MX-CONAFOR-308648-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 11,391.15 0.00 2022-08-19 2022-08-21 2022-08-26 2022-09-01 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Nuevo León-ERPD, Zo na A MX-CONAFOR-330971-CS-IN DV / Contratación de una con sultoría líder para atender y dar seguimiento a las recome Institutional Development an Individual Consult ndaciones derivadas del proc TF / A6448 Post Direct - National 5,693.02 0.00 Canceled 2023-01-12 2023-01-20 2023-01-23 2023-02-01 2023-03-31 d Facilitation Support ant Selection eso de evaluación y validació n independiente al Programa de Reducción de Emisiones e n los estados de Chihuahua, Coahuila, Durango y Nuevo L eón MX-CONAFOR-330975-CS-IN DV / Consultoría individual de apoyo técnico para atender y dar seguimiento a las recome Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Direct - National 3,049.83 0.00 2023-01-12 2023-01-20 2023-01-23 2023-02-01 2023-03-31 ndaciones derivadas del proc d Facilitation Support ant Selection ntation eso de evaluación externa de l Plan de Distribución de Ben eficios (PDB) del Programa d e Reducción de Emisiones MX-CONAFOR-336227-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Open - National 2,622.72 0.00 2023-01-30 2023-02-10 2023-02-13 2023-02-16 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Nuevo León-ERPD, Zo na A” MX-CONAFOR-336238-CS-IN DV / Contratación de un espe cialista para la asistencia en l Institutional Development an Individual Consult TF / A6448 Post Open - National 2,443.90 0.00 Canceled 2023-01-30 2023-02-10 2023-02-13 2023-02-16 2023-03-31 as adquisiciones y contrataci d Facilitation Support ant Selection ones de los proyectos de la C ONAFOR financiados mediant e crédito externo. MX-CONAFOR-336236-CS-IN DV / Consultor individual par a la interpretación visual de i Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 26,401.99 0.00 2023-03-16 2023-03-19 2023-03-23 2023-04-03 2024-09-30 mágenes satelitales para el p d Facilitation Support ant Selection ntation ost-procesamiento de produc tos del Sistema SAMOF en la Región Centro de México. MX-CONAFOR-336235-CS-IN DV / Consultor individual par a la interpretación visual de i Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 26,401.99 0.00 2023-03-16 2023-03-19 2023-03-23 2023-04-03 2024-09-30 mágenes satelitales para el p d Facilitation Support ant Selection ntation ost-procesamiento de produc tos del Sistema SAMOF en la Región Norte de México. MX-CONAFOR-336232-CS-IN DV / Consultor individual par a la interpretación visual de i Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 26,401.99 0.00 2023-03-16 2023-03-19 2023-03-23 2023-04-03 2024-09-30 mágenes satelitales para el p d Facilitation Support ant Selection ntation ost-procesamiento de produc tos del Sistema SAMOF en la Región Noroeste de México. MX-CONAFOR-336230-CS-IN DV / Consultor individual par a la interpretación visual de i Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 26,401.99 0.00 2023-03-16 2023-03-19 2023-03-23 2023-04-03 2024-09-30 mágenes satelitales para el p d Facilitation Support ant Selection ntation ost-procesamiento de produc tos del Sistema SAMOF en la Región Sureste de México. MX-CONAFOR-336231-CS-IN DV / Consultor individual par a la interpretación visual de i Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 26,401.99 0.00 2023-03-16 2023-03-19 2023-03-23 2023-04-03 2024-09-30 mágenes satelitales para el p d Facilitation Support ant Selection ntation ost-procesamiento de produc tos del Sistema SAMOF en la Región Sur de México. Page 7 MX-CONAFOR-336233-CS-IN DV / Consultor individual par a la interpretación visual de i Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 26,401.99 0.00 2023-03-16 2023-03-19 2023-03-23 2023-04-03 2024-09-30 mágenes satelitales para el p d Facilitation Support ant Selection ntation ost-procesamiento de produc tos del Sistema SAMOF en la Región Noreste de México. MX-CONAFOR-255584-CS-IN DV / Consultor individual de a poyo técnico al INECC y CON AFOR para la mejora de las e Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Open - National 30,997.89 0.00 2023-03-16 2023-03-27 2023-03-29 2023-04-03 2024-09-30 stimaciones de emisiones de d Facilitation Support ant Selection ntation gases de efecto Invernadero de las subcategorías relevant es de la categoría 3A Ganade ría del ERP-ISFL MX-CONAFOR-255577-CS-IN DV / Apoyo técnico al INECC y CONAFOR para la impleme ntación de acciones de mejor Institutional Development an Individual Consult Pending Impleme a para la estimación de emisi TF / A6448 Post Open - National 45,846.57 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ones de GEI y su integración en los Inventarios Estatales d e GEI para el sector AFOLU (a gricultura, silvicultura y otros usos del suelo) del ERP-ISFL MX-CONAFOR-255586-CS-IN DV / Consultor individual de a poyo técnico al INECC y CON AFOR para la mejora de las e Institutional Development an Individual Consult Pending Impleme stimaciones de emisiones de TF / A6448 Post Open - National 30,997.89 0.00 2023-02-06 2023-02-17 2023-02-20 2023-02-26 2023-04-10 d Facilitation Support ant Selection ntation gases de efecto Invernadero de las subcategorías relevant es de la categoría 3C Fuentes agregadas y de emisión no C O₂ de la tierra del ERP-ISFL MX-CONAFOR-272641-CS-IN DV / Contratación de un espe cialista para Asistencia espec Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 27,744.91 0.00 2023-03-16 2023-03-20 2023-03-23 2023-04-03 2024-09-30 ializada en Programación y R d Facilitation Support ant Selection ntation edes de la Unidad Técnica Es pecializada en Monitoreo, Re porte y Verificación -Extensió n MX-CONAFOR-207075-CS-IN DV / Consultor individual par Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 39,114.07 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 a el desarrollo de capacidade d Facilitation Support ant Selection ntation s en el marco del proyecto PF EPPF.-Extensión MX-CONAFOR-285678-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 Canceled 2023-03-16 2023-03-17 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon a A. MX-CONAFOR-285668-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 Canceled 2023-03-16 2023-03-17 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon a C. MX-CONAFOR-285672-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 Canceled 2023-03-16 2023-03-17 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Oaxaca-General, Zon a B. MX-CONAFOR-285666-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 Canceled 2023-03-16 2023-03-17 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Durango-ERPD, Zona D. MX-CONAFOR-285677-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 Canceled 2023-03-16 2023-03-17 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, México-General, Zona A. MX-CONAFOR-285647-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 Canceled 2023-03-16 2023-03-17 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Michoacán-General, Z ona A. MX-CONAFOR-344673-CS-IN DV / Contratación de un espe cialista para la asistencia en l Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Open - National 30,068.94 0.00 2023-03-16 2023-03-24 2023-03-29 2023-04-03 2024-09-30 as adquisiciones y contrataci d Facilitation Support ant Selection ntation ones de los proyectos de la C ONAFOR financiados mediant e crédito externo. Extensión MX-CONAFOR-344653-CS-IN DV / Contratación de un espe cialista para Asistencia en el Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 45,846.58 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 tema de Datos de Actividad d d Facilitation Support ant Selection ntation e la Unidad Técnica Especiali zada en Monitoreo, Reporte y Verificación - Extensión MX-CONAFOR-344684-CS-IN DV / Contratación de un espe cialista para Asistencia en el Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 45,846.58 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 tema de Factores de Emisión d Facilitation Support ant Selection ntation de la Unidad Técnica Especial izada en Monitoreo, Reporte y Verificación- Extensión. MX-CONAFOR-344685-CS-IN DV / Contratación de un espe cialista para Asistencia espec Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 30,997.90 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 ializada en Métodos Estadísti d Facilitation Support ant Selection ntation cos de la Unidad Técnica Esp ecializada en Monitoreo, Rep orte y Verificación. Extensión MX-CONAFOR-344646-CS-IN DV / Contratación de un espe cialista para Asistencia espec ializada en SIG e IEGEI en el Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 30,997.90 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 Sector Uso del Suelo, Cambio d Facilitation Support ant Selection ntation de Uso del Suelo y Silvicultur a de la Unidad Técnica Espe cializada en Monitoreo, Repo rte y Verificación- Extensión Page 8 MX-CONAFOR-344702-CS-IN DV / Especialista para brindar Asistencia Técnica para Seg uimiento a las auditorías exte Institutional Development an Individual Consult Pending Impleme rnas y apoyo al control presu TF / A6448 Post Open - National 30,068.94 0.00 2023-03-16 2023-03-24 2023-03-27 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation puestal de los proyectos fina nciados con crédito externo ( Contratación y coordinación c on las gerencias centrales y estatales ) Extensión. MX-CONAFOR-344652-CS-IN DV / Contratación de un espe cialista para asistencia en el seguimiento del financiamien Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 30,802.33 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 to externo de la CONAFOR (in d Facilitation Support ant Selection ntation formes de avances, marco de resultados, misiones, compro misos contractuales y acuerd os) Extensión MX-CONAFOR-344642-CS-IN DV / Contratación de un espe cialista para asistencia en el seguimiento al manejo financ Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 30,068.94 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 iero de los proyectos de la C d Facilitation Support ant Selection ntation ONAFOR financiados mediant e crédito externo (IFR, EFA, d esembolsos, conciliaciones, s eguimiento financiero) Exten sión MX-CONAFOR-344666-CS-IN DV / Especialista para seguim iento y monitoreo de aspecto s fiduciarios del financiamien Institutional Development an Individual Consult Under Implement to internacional, el control, or TF / A6448 Post Direct - National 30,068.94 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ation ganización y sistematización de la información del Proyect o (gestiones administrativas en la implementación, contro l documental) Extensión MX-CONAFOR-344649-CS-IN DV / Consultor especialista e n asistencia para la identifica Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 30,802.33 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 ción y consolidación de oport d Facilitation Support ant Selection ntation unidades de financiamiento a l sector forestal. Extensión. MX-CONAFOR-344650-CS-IN DV / Consultor individual de a poyo para la estimación de fl Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 45,846.58 0.00 2023-03-16 2023-03-21 2023-03-24 2023-04-03 2024-09-30 ujos y modelación de gases d d Facilitation Support ant Selection ntation e efecto invernadero en el se ctor forestal a nivel subnacio nal Extensión MX-CONAFOR-344709-CS-IN DV / Contratación de un espe cialista para la gestión y cont Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 15,156.70 0.00 2023-03-16 2023-03-21 2023-03-24 2023-04-03 2024-09-30 rol de calidad de bases de da d Facilitation Support ant Selection ntation tos geoespaciales del Sistem a Satelital de Monitoreo Fore stal (SAMOF) Extensión MX-CONAFOR-344651-CS-IN DV / Contratación de un espe cialista para el análisis y cont Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 23,370.65 0.00 2023-03-16 2023-03-20 2023-03-24 2023-04-03 2024-09-30 rol de calidad de datos geoes d Facilitation Support ant Selection ntation paciales del Sistema Satelital de Monitoreo Forestal (SAMO F) Extensión MX-CONAFOR-344654-CS-IN DV / Consultor individual par a dirigir y coordinar las accio nes que se implementen en l Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 94,851.61 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 os componentes del proyecto d Facilitation Support ant Selection ntation y que esté en permanente co municación con las Gerencias a nivel central y en los estad os del proyecto. Extensión MX-CONAFOR-344677-CS-IN DV / Consultor individual par Institutional Development an Individual Consult Pending Impleme a integrar los aspectos de pr TF / A6448 Post Direct - National 39,114.07 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation oducción y productividad en el marco del proyecto PFEPPF . Extensión MX-CONAFOR-344680-CS-IN DV / Consultor individual par Institutional Development an Individual Consult Pending Impleme a integrar los aspectos de res TF / A6448 Post Direct - National 39,114.07 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation tauración forestal en el marc o del proyecto PFEPPF. Exten sión MX-CONAFOR-344655-CS-IN DV / “Consultor individual par Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 39,114.07 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 a las actividades de seguimie d Facilitation Support ant Selection ntation nto y evaluación del Proyecto PFEPPF” Extensión MX-CONAFOR-344656-CS-IN DV / Consultor individual esp Institutional Development an Individual Consult Pending Impleme ecialista de salvaguardas del TF / A6448 Post Direct - National 39,114.07 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation proyecto “Fortalecimiento E mpresarial en Paisajes Produ ctivos”. Extensión MX-CONAFOR-344657-CS-IN DV / Consultoría individual de apoyo técnico para atender y dar seguimiento a las recome Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Direct - National 8,148.76 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2023-07-31 ndaciones derivadas del proc d Facilitation Support ant Selection ntation eso de evaluación externa de l Plan de Distribución de Ben eficios del Programa de Redu cción de Emisiones. Extensió n MX-CONAFOR-344688-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Quintana Roo-Genera l, Zona B Extensión MX-CONAFOR-344669-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Oaxaca-PFC. Extensió n Page 9 MX-CONAFOR-344665-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Oaxaca-General, Zon a A. Extensión MX-CONAFOR-344708-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Veracruz-PFC. Extensi ón MX-CONAFOR-344682-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, México-General, Zona B. Extensión MX-CONAFOR-344624-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Puebla-General, Zona B. Extensión MX-CONAFOR-344687-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chiapas-PFC, Zona B. Extensión MX-CONAFOR-344674-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 Canceled 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Campeche-PFC. Exten sión MX-CONAFOR-344660-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Tamaulipas-General. Extensión MX-CONAFOR-344661-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Direct - National 32,269.20 0.00 Canceled 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Nayarit-General. Exte nsión MX-CONAFOR-344658-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Tlaxcala-General, Zon a A. Extensión MX-CONAFOR-344679-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon a B. Extensión MX-CONAFOR-344638-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon a D. Extensión MX-CONAFOR-344643-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 Canceled 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Chiapas-PFC, Zona A. Extensión. MX-CONAFOR-344670-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Michoacán-General, Z ona B. Extensión MX-CONAFOR-344664-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2023-03-16 2023-03-20 2023-03-22 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Coahuila-ERPD, Zona A. Extensión MX-CONAFOR-344648-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Durango-ERPD, Zona B. Extensión MX-CONAFOR-344644-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 Canceled 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Durango-ERPD, Zona C. Extensión MX-CONAFOR-344659-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Nuevo León-ERPD, Zo na B. Extensión MX-CONAFOR-344675-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Michoacán-General, Z ona C. Extensión MX-CONAFOR-344645-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2023-03-16 2023-03-20 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Guerrero-General, Zo na B. Extensión MX-CONAFOR-344681-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Durango-ERPD, Zona A. Extensión Page 10 MX-CONAFOR-344671-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 Canceled 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, San Luis Potosí-Gener al. Extensión MX-CONAFOR-344704-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 Canceled 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ación especializada y apoyo t écnico, Guerrero-General, Zo na A, Extensión. MX-CONAFOR-344668-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Puebla-General, Zona A. Extensión MX-CONAFOR-344678-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2023-03-16 2023-03-20 2023-03-22 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Puebla-General, Zona C. Extensión MX-CONAFOR-344707-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Quintana Roo-Genera l, Zona A. Extensión MX-CONAFOR-344663-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Hidalgo-General, Zon a A. Extensión MX-CONAFOR-344701-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-20 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Nuevo León-ERPD, Zo na A. Extensión MX-CONAFOR-344683-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Jalisco-General, Zona A. Extensión. MX-CONAFOR-344705-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Jalisco-General, Zona B. Extensión MX-CONAFOR-344667-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2023-03-16 2023-03-21 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Coahuila-ERPD, Zona B. Extensión MX-CONAFOR-344699-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Tabasco-PFC. Extensi ón MX-CONAFOR-344662-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2023-03-16 2023-03-20 2023-03-22 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Campeche-General. E xtensión MX-CONAFOR-344676-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Direct - National 32,269.10 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Veracruz-General. Ext ensión MX-CONAFOR-338219-CS-IN DV / Contratación de una con sultoría líder para atender y dar seguimiento a las recome Institutional Development an Individual Consult ndaciones derivadas del proc TF / A6448 Post Limited 17,818.63 0.00 Canceled 2023-03-16 2023-03-20 2023-03-22 2023-04-03 2023-07-31 d Facilitation Support ant Selection eso de evaluación y validació n independiente al Programa de Reducción de Emisiones e n los estados de Chihuahua, Coahuila, Durango y Nuevo L eón MX-CONAFOR-336228-CS-IN DV / Contratación de un espe cialista para Asistencia en el Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 45,846.58 0.00 2023-03-16 2023-03-19 2023-03-23 2023-04-03 2024-09-30 tema de Reporte y Registro d d Facilitation Support ant Selection ntation e la Unidad Técnica Especiali zada en Monitoreo, Reporte y Verificación - Extensión MX-CONAFOR-346431-CS-IN DV / Consultor individual de a poyo para la capacitación y a Institutional Development an Individual Consult Pending Impleme seguramiento y control de ca TF / A6533 Post Limited 26,890.92 0.00 2023-03-16 2023-03-21 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation lidad en el levantamiento de datos de campo del Inventari o Nacional Forestal y de Suel os en Durango- Extensión MX-CONAFOR-346425-CS-IN DV / Consultor individual de a poyo para la capacitación y a Institutional Development an Individual Consult Pending Impleme seguramiento y control de ca TF / A6533 Post Limited 26,890.92 0.00 2023-03-16 2023-03-20 2023-03-22 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation lidad en el levantamiento de datos de campo del Inventari o Nacional Forestal y de Suel os en Chihuahua-Extensión MX-CONAFOR-346426-CS-IN DV / Consultor individual de a poyo para la capacitación y a Institutional Development an Individual Consult Pending Impleme seguramiento y control de ca TF / A6533 Post Limited 26,890.92 0.00 2023-03-16 2023-03-21 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation lidad en el levantamiento de datos de campo del Inventari o Nacional Forestal y de Suel os en Coahuila-Extensión Page 11 MX-CONAFOR-346429-CS-IN DV / Consultor individual de a poyo para la capacitación y a Institutional Development an Individual Consult Pending Impleme seguramiento y control de ca TF / A6533 Post Limited 26,890.92 0.00 2023-03-16 2023-03-21 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation lidad en el levantamiento de datos de campo del Inventari o Nacional Forestal y de Suel os en Nuevo León-Extensión MX-CONAFOR-346427-CS-IN DV / Consultor individual de a poyo para la capacitación y a Institutional Development an Individual Consult Pending Impleme seguramiento y control de ca TF / A6533 Post Limited 26,890.92 0.00 2023-03-16 2023-03-21 2023-03-22 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation lidad en el levantamiento de datos de campo del Inventari o Nacional Forestal y de Suel os en Jalisco-Extensión MX-CONAFOR-346428-CS-IN DV / Consultor individual de a poyo para la capacitación y a Institutional Development an Individual Consult Pending Impleme seguramiento y control de ca TF / A6533 Post Limited 26,890.92 0.00 2023-03-16 2023-03-21 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation lidad en el levantamiento de datos de campo del Inventari o Nacional Forestal y de Suel os en Nayarit- Extensión MX-CONAFOR-346432-CS-IN DV / Consultor individual de a poyo para la capacitación y a Institutional Development an Individual Consult Pending Impleme seguramiento y control de ca TF / A6533 Post Limited 26,890.92 0.00 2023-03-16 2023-03-21 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation lidad en el levantamiento de datos de campo del Inventari o Nacional Forestal y de Suel os en San Luis Potosí-Extensi ón MX-CONAFOR-346430-CS-IN DV / Consultor individual de a poyo para la capacitación y a Institutional Development an Individual Consult Pending Impleme seguramiento y control de ca TF / A6533 Post Limited 26,890.92 0.00 2023-03-16 2023-03-21 2023-03-23 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation lidad en el levantamiento de datos de campo del Inventari o Nacional Forestal y de Suel os en Tamaulipas-Extensión MX-CONAFOR-348485-CS-IN DV / Contratación de un espe cialista para la asistencia en l Institutional Development an Individual Consult Pending Impleme as adquisiciones y contrataci TF / A6448 Post Direct - National 30,553.94 0.00 2023-03-16 2023-03-22 2023-03-24 2023-04-03 2024-09-30 d Facilitation Support ant Selection ntation ones de los proyectos de la C ONAFOR financiados mediant e crédito externo (Especialist a 2)- Extensión MX-CONAFOR-356340-CS-IN DV / Consultor especialista p ara el desarrollo y la implem Institutional Development an Individual Consult Pending Impleme entación de mecanismos inn TF / A6448 Post Direct - National 28,578.11 0.00 2023-04-28 2023-05-04 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ovadores de financiamiento e n el marco del Programa de R educción de Emisiones (PRE) de ISFL en México MX-CONAFOR-356345-CS-IN DV / Consultor Individual par a proporcionar orientación es Institutional Development an Individual Consult Under Implement pecializada y apoyo en camp TF / A6533 Post Direct - National 40,825.86 0.00 2023-04-28 2023-05-02 2023-05-04 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ation o al Programa de Reducción de Emisiones en los estados de Chihuahua, Coahuila, Dur ango y Nuevo León. MX-CONAFOR-356363-CS-IN DV / Consultor Individual par Institutional Development an Individual Consult Pending Impleme a proporcionar el servicio de TF / A6448 Post Limited 22,681.04 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation generación y seguimiento a l a estrategia de comunicación . MX-CONAFOR-356368-CS-IN DV / Consultor Individual par Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 22,681.04 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 a proporcionar el servicio de d Facilitation Support ant Selection ntation elaboración de materiales au diovisuales. MX-CONAFOR-356376-CS-IN Institutional Development an Individual Consult Pending Impleme DV / Consultor Individual par TF / A6448 Post Limited 22,681.04 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation a proporcionar el servicio de diseño gráfico. MX-CONAFOR-356380-CS-IN DV / Consultor Individual par Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Limited 22,681.04 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 a proporcionar el servicio de d Facilitation Support ant Selection ntation diseño de materiales para m edios digitales. MX-CONAFOR-356383-CS-IN DV / Consultoría individual pa ra atender e integrar, las rec omendaciones derivadas del Institutional Development an Individual Consult Pending Impleme proceso de evaluación y valid TF / A6448 Post Limited 74,393.80 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación independiente al Progr ama de Reducción de Emisio nes, así como asistir en la co ordinación y preparación de acciones propuestas en el PR E. MX-CONAFOR-356414-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, San Luis Potosí-Gener al. Extensión MX-CONAFOR-356415-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chiapas-PFC, Zona A. Extensión. MX-CONAFOR-356416-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Nayarit-General. Exte nsión MX-CONAFOR-356417-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Guerrero-General, Zo na A, Extensión. Page 12 MX-CONAFOR-356418-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Campeche-PFC. Exten sión MX-CONAFOR-356419-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon aA MX-CONAFOR-356420-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon aC MX-CONAFOR-356421-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Oaxaca-General, Zon aB MX-CONAFOR-356422-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Durango-ERPD, Zona D MX-CONAFOR-356423-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, México-General, Zona A MX-CONAFOR-356424-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 29,938.97 0.00 2023-04-28 2023-05-03 2023-05-10 2023-05-16 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Michoacán-General, Z ona A MX-CONAFOR-344633-CS-IN DV / Contratación de un espe cialista para Asistencia espec ializada en Bases de Datos d Institutional Development an Individual Consult Pending Impleme TF / A6448 Post Direct - National 27,966.56 0.00 2023-03-16 2023-03-21 2023-03-23 2023-04-03 2024-09-30 el Sistema de Estimación de d Facilitation Support ant Selection ntation Biomasa y Carbono de la Uni dad Técnica Especializada en Monitoreo, Reporte y Verifica ción. Extensión. MX-CONAFOR-361401-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon a A. MX-CONAFOR-361400-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, México-General, Zona A. MX-CONAFOR-361392-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Chihuahua-ERPD, Zon a C. MX-CONAFOR-361404-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Durango-ERPD, Zona D. MX-CONAFOR-361391-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Oaxaca-General, Zon a B. MX-CONAFOR-361398-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 32,269.10 0.00 2022-03-31 2022-04-01 2022-04-07 2022-04-18 2023-03-31 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Michoacán-General, Z ona A. MX-CONAFOR-363244-CS-IN DV / Especialista en Goberna nza en los Estados con interv Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 ención del PROFOEM y del Pr d Facilitation Support ant Selection ntation ograma de Reducción de Emi siones del sector AFOLU en el estado de Chihuahua MX-CONAFOR-363263-CS-IN DV / Especialista en Goberna nza en los Estados con interv Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 ención del PROFOEM y del Pr d Facilitation Support ant Selection ntation ograma de Reducción de Emi siones del sector AFOLU en el estado de Coahuila MX-CONAFOR-363262-CS-IN DV / Especialista en Goberna nza en los Estados con interv Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 ención del PROFOEM y del Pr d Facilitation Support ant Selection ntation ograma de Reducción de Emi siones del sector AFOLU en el estado de Durango MX-CONAFOR-363261-CS-IN DV / Especialista en Goberna nza en los Estados con interv Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 ención del PROFOEM y del Pr d Facilitation Support ant Selection ntation ograma de Reducción de Emi siones del sector AFOLU en el estado de Nuevo León MX-CONAFOR-363539-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Campe che Page 13 MX-CONAFOR-363543-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Chiapa s MX-CONAFOR-363270-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Guerrer o MX-CONAFOR-363268-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Hidalgo MX-CONAFOR-363536-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Jalisco MX-CONAFOR-363265-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, México MX-CONAFOR-363534-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Michoa cán MX-CONAFOR-363272-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Nayarit MX-CONAFOR-363541-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Oaxaca MX-CONAFOR-363546-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Puebla MX-CONAFOR-363266-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Quinta na Roo MX-CONAFOR-363550-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, San Lui s Potosí MX-CONAFOR-363269-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Tabasc o MX-CONAFOR-363267-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Tamaul ipas MX-CONAFOR-363271-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Tlaxcal a MX-CONAFOR-363264-CS-IN DV / Especialista en Goberna Institutional Development an Individual Consult Pending Impleme TF / A6533 Post Limited 35,895.75 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 nza en los Estados con interv d Facilitation Support ant Selection ntation ención del PROFOEM, Veracr uz MX-CONAFOR-363554-CS-IN DV / Consultor Individual Regi Institutional Development an Individual Consult Pending Impleme onal para proporcionar orient TF / A6533 Post Limited 27,547.90 0.00 2023-06-15 2023-06-19 2023-06-23 2023-07-03 2024-09-30 d Facilitation Support ant Selection ntation ación especializada y apoyo t écnico, Durango-ERPD, Zona C. Extensión MX-CONAFOR-344672-CS-IN DV / Consultor individual par Institutional Development an Individual Consult Pending Impleme a integrar los aspectos de bio TF / A6448 Post Direct - National 39,114.07 0.00 2023-03-16 2023-03-23 2023-03-25 2023-04-04 2024-09-30 d Facilitation Support ant Selection ntation diversidad en el marco del pr oyecto PFEPPF. Extensión Page 14 PROCUREMENT PLAN General 1. Project Information a. Country: Federal Republic of Somalia b. Project Name: Horn of Africa - Ground Water for Resilience - Somalia Component c. Project Number: P174867 d. Total Finance: USD 30 million 2. Project Implementation Agency: Ministry of Energy and Water Resources (MoEWR) 3. Date of Project Plan: January 2022 4. Period Covered by this Procurement: April2021 – Nov 2023 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” November 2020 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Document: The Bank’s standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified into Procurement Plan tables in STEP III. National Procurement Arrangements: Not applicable IV. Prequalification: Not applicable V. Leased Assets: Not Applicable VI. Procurement of Second-hand Goods: Not Applicable VII. Domestic Preference: Not Applicable 1 VIII. Hands on Expanded Implementation Support (HEIS): Not applicable IX. Other Relevant Procurement Information: Not Applicable X. Thresholds for Procurement Approaches and Method (US$ millions) Based on the risks identified above, the following procurement arrangements are proposed: a) Approach to Market: Based on previous experience and available local market, the following threshold will be used of open national/international and RFQ bidding (all figures in million USD) Table 1.2: Thresholds for procurement approaches and methods Procurement Methods (US$ millions)–Goods, Works, and Non- Consulting Services Open Open Request for Direct Category Internatio National Quotation Selection nal (RfQ) Works ≥ 5.0 <5.0 ≤ 0.2 All Values Goods, IT, and non- ≥ 0.5 <0.5 ≤ 0.1 All Values consultin g services Thresholds for Procurement Approaches and Methods (US$, millions) – Consulting Services Category Short List of National Consultants Consulting Engineering and Services Construction Supervision Consultants (Firms) ≤ 0.1 ≤ 0.2 Individual Consultants N/A N/A Direct Selection Consultants (Firms) All Values All Values Individual Consultants All Values All Values 2 XI. Table Packages for Goods, Works and Non-Consulting Services (At Negotiations – to be entered in STEP) Procurement Selection Estimat Bank Approach Ref. Contract Title, Description and Method Evaluation ed Cost Oversig (Open- No Category (RFP, RFB, Method (US$) ht National/ RFQ etc.) Limited etc.) Most Water Quality Testing kits for 5 states - G1 37,500.0 Prior Limited RFQ advantageous FGS 0 Bid Most Vehicles (1 per MS, 2 for FGS/MoEWR) - G2 315,000. Prior Open-National RFB advantageous FGS & 5 states 00 Bid Most GW office furniture and equipment - FGS & 144,000. Prior Open-National RFB advantageous G3 5 states 00 Bid Most Hydromet center data, information and 30,000.0 G4 Prior Limited RFQ advantageous national monitoring equipment - FGS 0 Bid 526,50 0.00 Works Most Design new/rehabilitate FGS MoEWR office 100,000. W1 Prior Limited RFQ advantageous - FGS 00 Bid Most 250,000. W2 Build new offices - 5 states Prior Open-National RFB advantageous 00 Bid Establish GW-data and information office Most 10,000.0 W3 section within National Hydromet Center - Prior Limited RFQ advantageous 0 FGS Bid 1 Procurement Selection Estimat Bank Approach Ref. Contract Title, Description and Method Evaluation ed Cost Oversig (Open- No Category (RFP, RFB, Method (US$) ht National/ RFQ etc.) Limited etc.) Engage construction engineering firm in Most 600,000. Open- W4 water point development / investments - 5 Prior RFB advantageous 00 International state Bid Most Open- W5 Develop the manually drilling technique 320,000 Prior RFB advantageous International Bid Sub- 1,280,000 Total Market Method Review by Approach Estimated (QCBS, Ref No. Contract Description Bank (Open- Cost (US$) LCBCS, QBS, (Prior/Post) National/ DS Limited etc.) Consulting Services Consultancy Services for back-stopping Open- C1 528,000.00 Prior QCBS engineers - FGS International Consultancy - Comprehensive hydrogeological Open C2 600,000.00 Prior QCBS survey - FGS International Consultancy - Study and development of Merti C3 200,000.00 Prior Open – National CQS auifer water - FGS 2 Market Method Review by Approach Estimated (QCBS, Ref No. Contract Description Bank (Open- Cost (US$) LCBCS, QBS, (Prior/Post) National/ DS Limited etc.) Consultancy - Study on resilient water supply Open- C4 for densely populated rural/peri-urban areas - 480,000.00 Prior QCBS International FGS & 5 States Consultancy Services - Rapid assessment of existing GW-governance condition (incl standards, guidelines) and (i) arrange interim C5 200,000.00 Prior Open - National CQS project system and (ii) present to government national comprehensive system - FGS (50% of project total) Consultancy Services - Develop national GW- C6 75,000.00 Prior Limited CQS strategy - FGS C7 Arrange water quality testing in Nairobi - FGS 10,000.00 Prior TBD TBD Consultancy Services - Develop business models for private sector engagement in GW C8 210,000.00 Prior Open-National CQS development, distribution and management - FGS Consultancy Services - Develop transboundary C9 water management models and engage in 150,000.00 Prior Open-National CQS cooperation - FGS Develop national GW data and information C10 25,000.00 Prior Open-National CQS management system - FGS Consultancy Services - Transfer of knowledge and method development (incl manual well- C11 250,000.00 Prior Open-National QCBS drilling, sustainable gw-management; reduce cost of investments) - FGS Consultancy Services - Develop academic BSc C12 education in GW development, management 150,000.00 Prior Open-National QCBS and monitoring - FGS 3 Market Method Review by Approach Estimated (QCBS, Ref No. Contract Description Bank (Open- Cost (US$) LCBCS, QBS, (Prior/Post) National/ DS Limited etc.) Consultancy Services - Arrange and deliver 1 year long "learning by doing & organized C13 40,000.00 Prior Limited INDV training" package in groundwater development and management. Consultancy Services - Assess capacity development status/needs, develop linked C14 strategy, prepare project training and 70,000.00 Prior Limited INDV curriculum in selected GW capacity development topics - FGS Consultancy Services - Develop, establish and C15 support project monitoring, evaluation and 60,000.00 Prior Limited INDV internal learning system - FGS Consultancy Services - Arrange and deliver GW C16 75,000.00 Prior Limited INDV capacity development (a package) - FGS Consultancy Services - Arrange and deliver GW Open- C17 400,000.00 Prior QCBS capacity development (a package) - 5 states International C18 Project Coordinator NPCU (18 month) - FGS 126,000.00 Prior Open-National INDV C19 Groundwater Engineer NPCU (18 month) - FGS 99,000.00 Prior Open-National INDV Social & Environmental Safeguard Specialist C20 63,000.00 Prior Open-National INDV NPCU (18 month) - FGS C21 Finance Specialist NPCU (18 month) - FGS 63,000.00 Prior Open-National INDV Procurement Specialist for NPCU (18 months) – C22 63,000.00 Prior Open-National INDV FGS C23 Security Specialist for NPCU (18 months) - FGS 63,000.00 Prior Open-National INDV Gender and Social Safeguard Specialist for C24 63,000.00 Prior Open-National INDV NPCU (18 months) - FGS Community Development Specialist for NPCU C25 63,000.00 Prior Open-National INDV (18 months) - FGS C26 Office Manager for NPCU - FGS 18,000.00 Prior Open-National INDV 4 Market Method Review by Approach Estimated (QCBS, Ref No. Contract Description Bank (Open- Cost (US$) LCBCS, QBS, (Prior/Post) National/ DS Limited etc.) Consultancy Services - Arrange a project C27 18,000.00 Prior Open-National INDV website and develop information strategy - FGS Security and Safeguard arrangements - FGS C28 450,000.00 Prior Open-National QCBS and 5 states C29 Water Engineer PIUs (18 month) – for 5 States 270,000.00 Prior Open-National QCBS Consultancy Services - Annual audit Services - C31 50,000.00 Prior Open-National LCS FGS Sub-total 4,932,000 Grand Total 6,738,500 5 PROCUREMENT Eastern and Southern Africa : Horn of Africa - Groundwater for Resilience Project PLAN General Information Country: Eastern and Southern Africa 2022-09-12 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174867 GPN Date: 2022-11-22 Project Name: Horn of Africa - Groundwater for Resilience Project Loan / Credit No: IDA / 70820 Water Sector Trust Fund Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-WSTF-307268-GO-RFB / S Component one: Delivery of upply and Delivery of various Single Stage - One E IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 381,000.00 0.00 Canceled 2022-08-22 2022-08-27 2022-10-08 2022-11-07 2022-12-12 2023-06-10 Groundwater management e nvelope es to priority areas quipment for Counties KE-WSTF-307271-GO-RFQ / P Component one: Delivery of Request for Quota Single Stage - One E rovision for Microsoft Office 3 IDA / 70820 inclusive groundwater servic Post Limited 30,000.00 0.00 Canceled 2022-10-12 2022-12-07 2023-02-27 tions nvelope 60 license es to priority areas KE-WSTF-307267-GO-RFB / S upply and Delivery of assorte Component one: Delivery of Single Stage - One E d office furniture and Confere IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 300,000.00 0.00 Canceled 2022-10-07 2022-10-12 2022-11-23 2022-12-23 2023-01-27 2023-03-27 nvelope nce Facilities for WSTF and th es to priority areas e 5 County Governments KE-WSTF-307242-GO-RFB / S Component one: Delivery of upply and Delivery of 7 No. P Single Stage - One E IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 620,000.00 0.00 Canceled 2022-10-07 2022-10-12 2022-11-23 2022-12-23 2023-01-27 2023-03-01 roject Vehicles for WSTF PIU nvelope es to priority areas and 5 Counties implementing the project KE-WSTF-307265-GO-RFB / S upply and Delivery of assorte Component one: Delivery of Single Stage - One E d ICT Equipment and Accesso IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 150,000.00 0.00 Canceled 2022-10-07 2022-10-12 2022-11-23 2022-12-23 2023-01-27 2023-04-03 nvelope ries (Laptops, Printers) for W es to priority areas STF and the 5 Counties KE-WSTF-307270-GO-RFQ / P Component one: Delivery of Request for Quota Single Stage - One E rovision for Auto Desk licens IDA / 70820 inclusive groundwater servic Post Limited 20,000.00 0.00 Canceled 2022-10-12 2022-12-07 2023-02-27 tions nvelope e (Civil 3D) - Multiple users es to priority areas KE-WSTF-307273-GO-RFQ / Component one: Delivery of Request for Quota Single Stage - One E Communication Equipment a IDA / 70820 inclusive groundwater servic Post Limited 40,000.00 0.00 Canceled 2022-10-12 2022-12-07 2023-02-07 tions nvelope nd Publicity for WSTF and 5 C es to priority areas ounties KE-WSTF-332744-GO-RFB / S Component one: Delivery of upply and Delivery of 7 No. P Single Stage - One E Pending Impl IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 620,000.00 0.00 2023-01-04 2023-01-09 2023-01-30 2023-02-20 2023-03-27 2023-06-25 roject Vehicles for WSTF PIU nvelope ementation es to priority areas and 5 Sub-PIUs Counties KE-WSTF-332761-GO-RFB / S Component one: Delivery of Single Stage - One E Pending Impl upply and Installation of Auto IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 20,000.00 0.00 2023-01-04 2023-01-09 2023-01-30 2023-02-20 2023-03-27 2023-06-25 nvelope ementation Desk License (Civil 3D) for M es to priority areas ultiple Users KE-WSTF-332828-GO-RFB / P Component one: Delivery of Single Stage - One E Pending Impl rovision for Microsoft Office 3 IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 30,000.00 0.00 2023-01-04 2023-01-09 2023-01-30 2023-02-20 2023-03-27 2023-05-26 nvelope ementation 60 License es to priority areas KE-WSTF-332758-GO-RFB / S Component one: Delivery of upply and Delivery of Various Single Stage - One E Pending Impl IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 381,000.00 0.00 2023-05-02 2023-05-07 2023-05-28 2023-06-18 2023-07-23 2023-10-21 Groundwater Management E nvelope ementation es to priority areas quipment for Counties KE-WSTF-332751-GO-RFB / S upply and Delivery of Assorte Component one: Delivery of Single Stage - One E Pending Impl d Office Furniture and Confer IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 300,000.00 0.00 2023-05-02 2023-05-07 2023-05-28 2023-06-18 2023-07-23 2023-10-21 nvelope ementation ence Facilities for WSTF and t es to priority areas he 5 County Governments KE-WSTF-332748-GO-RFB / S upply and Delivery of Assorte Component one: Delivery of Single Stage - One E Pending Impl d ICT Equipment and Accesso IDA / 70820 inclusive groundwater servic Post Request for Bids Open - National 170,000.00 0.00 2023-05-12 2023-05-17 2023-06-07 2023-06-28 2023-08-02 2023-10-31 nvelope ementation ries (Laptops and Printers) fo es to priority areas r WSTF and the 5 Counties KE-WSTF-332832-GO-RFB / S Component one: Delivery of upply and Delivery of Comm Request for Quota Single Stage - One E Pending Impl IDA / 70820 inclusive groundwater servic Post Limited 20,000.00 0.00 2023-06-04 2023-07-30 2023-09-28 unication and Publicity Equip tions nvelope ementation es to priority areas ment for WaterFund and 5 Su b-PIU Counties NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 KE-WSTF-307237-CS-QCBS / Component one: Delivery of Consultancy to undertake Ind Quality And Cost- Open - Internationa IDA / 70820 inclusive groundwater servic Post 800,000.00 0.00 Canceled 2023-06-22 2023-07-13 2023-08-26 2023-09-23 2023-10-23 2023-11-27 2024-01-01 2024-12-31 ependent Verification of Resu Based Selection l es to priority areas lts under the Performance-Ba sed Grant KE-WSTF-307238-CS-QCBS / Consultancy to provide TA to County Governments of Turk Component one: Delivery of Quality And Cost- Open - Internationa ana, Wajir, Garissa, Mandera, IDA / 70820 inclusive groundwater servic Post 200,000.00 0.00 Canceled 2022-08-22 2022-09-12 2022-10-26 2022-11-23 2022-12-23 2023-01-27 2023-03-03 2024-03-02 Based Selection l and Marsabit to develop Insti es to priority areas tutional Systems for sustaina ble O&M of rural Water suppl y Infrastructure KE-WSTF-307240-CS-QCBS / Consultancy for the Develop ment and Implementation Su Component one: Delivery of pport of a Web-based Inform Quality And Cost- Open - Internationa IDA / 70820 inclusive groundwater servic Post 500,000.00 0.00 Canceled 2022-08-22 2022-09-12 2022-10-26 2022-11-23 2022-12-23 2023-01-27 2023-03-03 2024-03-02 ation Management System (I Based Selection l es to priority areas MS) and Decision Support Sy stem (DSS) for the O&M of ru ral water supply systems at t he county level KE-WSTF-307241-CS-QCBS / Consultancy for TA to County Component one: Delivery of Governments for the Prepara Quality And Cost- IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 Canceled 2022-12-16 2023-01-06 2023-02-19 2023-03-19 2023-04-18 2023-05-23 2023-06-27 2024-06-26 tion of the County Water Sec Based Selection es to priority areas tor Drought Contingency Plan s for Turkana, Marsabit, Wajir , and Mandera counties KE-WSTF-328819-CS-QCBS / Lot 1: Implementation Suppo rt Consultancy to undertake Component one: Delivery of Feasibility studies, Detailed d Quality And Cost- Open - Internationa Under Implement IDA / 70820 inclusive groundwater servic Prior 1,200,000.00 0.00 2022-12-20 2023-04-05 2022-12-24 2023-05-18 2023-01-21 2023-02-11 2023-03-13 2023-04-10 2023-05-15 2023-07-14 esigns , preparation of ESF in Based Selection l ation es to priority areas struments and Construction Supervision of various new, R ehabilitations and Upgrading of existing groundwater infra structure KE-WSTF-328828-CS-QCBS / Component one: Delivery of Consultancy to Undertake In Quality And Cost- Open - Internationa Under Implement IDA / 70820 inclusive groundwater servic Prior 800,000.00 0.00 2023-01-04 2023-04-05 2023-01-11 2023-05-18 2023-02-22 2023-03-08 2023-03-29 2023-05-03 2023-06-07 2024-06-06 dependent Verification of Res Based Selection l ation es to priority areas ults under the Performance-B ased Grant KE-WSTF-330591-CS-QCBS / Consultancy to provide Tech nical Assistance to County G Component one: Delivery of Quality And Cost- Open - Internationa Under Implement overnments to develop Instit IDA / 70820 inclusive groundwater servic Post 200,000.00 0.00 2022-12-18 2023-04-03 2023-01-08 2023-05-11 2023-02-21 2023-03-21 2023-04-20 2023-05-25 2023-06-29 2024-06-28 Based Selection l ation utional Systems for Sustaina es to priority areas ble Operation & Maintenance of Rural Water Supply Infrast ructure KE-WSTF-330626-CS-QCBS / Consultancy for Technical As Component one: Delivery of Quality And Cost- Open - Internationa Under Implement sistance to County Governme IDA / 70820 inclusive groundwater servic Post 100,000.00 0.00 2023-01-04 2023-01-25 2023-03-10 2023-04-07 2023-05-07 2023-06-11 2023-07-16 2024-01-12 Based Selection l ation nts for the Preparation of the es to priority areas County Water Sector Drought Contingency Plans KE-WSTF-332741-CS-QCBS / Lot 2 - Implementation Supp ort Consultancy to Undertake Component one: Delivery of Feasibility Studies, Detailed Quality And Cost- Open - Internationa Under Implement IDA / 70820 inclusive groundwater servic Prior 1,800,000.00 0.00 2022-12-27 2023-04-05 2023-01-17 2023-05-18 2023-02-21 2023-03-14 2023-04-04 2023-05-09 2023-06-13 2023-12-12 Designs, Preparation of ESF I Based Selection l ation es to priority areas nstruments and Construction Supervision of various new, R ehabilitations and Upgrading of existing Groundwater Infra structure. KE-WSTF-332742-CS-QCBS / Consultancy for the Develop Component one: Delivery of ment and Implementation Su Quality And Cost- Open - Internationa Under Implement IDA / 70820 inclusive groundwater servic Prior 500,000.00 0.00 2023-01-04 2023-04-24 2023-01-25 2023-05-18 2023-03-01 2023-03-22 2023-04-12 2023-05-17 2023-06-21 2023-12-20 pport of a Web-based Inform Based Selection l ation es to priority areas ation Management System a nd Decision Support System KE-WSTF-307233-CS-QCBS / Implementation Support Con sultancy to undertake Feasibi lity studies, Detailed designs Component one: Delivery of Quality And Cost- Open - Internationa , preparation of ESF instrume IDA / 70820 inclusive groundwater servic Post 3,000,000.00 0.00 Canceled 2022-08-22 2022-09-22 2022-11-22 2022-12-20 2023-01-19 2023-02-23 2023-03-30 2024-03-29 Based Selection l nts and Construction Supervi es to priority areas sion of various new, Rehabilit ations and Upgrading of exist ing groundwater infrastructur e in the implementing INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-WSTF-307277-CS-INDV / Component one: Delivery of Individual Consult M&E Consultant to Support IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 Canceled 2022-08-22 2022-10-10 2022-10-31 2022-12-05 2023-06-03 ant Selection WSTF PIU es to priority areas KE-WSTF-307280-CS-INDV / Component one: Delivery of Individual Consult Procurement Specialist Supp IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 Canceled 2022-08-22 2022-10-10 2022-10-31 2022-12-05 2023-06-03 ant Selection ort to the Counties through es to priority areas WSTF KE-WSTF-307282-CS-INDV / Component one: Delivery of Individual Consult Environmental Safeguards C IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 Canceled 2022-08-22 2022-10-10 2022-10-31 2022-12-05 2023-06-03 ant Selection onsultant to Support WSTF a es to priority areas nd WRA PIUs KE-WSTF-307284-CS-INDV / Component one: Delivery of Individual Consult Consultant Project Accountan IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 Canceled 2022-08-22 2022-10-10 2022-10-31 2022-12-05 2023-06-03 ant Selection t for WSTF to support PBG Di es to priority areas sbursements KE-WSTF-307842-CS-INDV / Component one: Delivery of This is an Individual Consulta Individual Consult IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 Canceled 2022-09-01 2022-10-20 2022-11-10 2022-12-15 2027-11-19 ncy support to the PIU, mainl ant Selection es to priority areas y for administration of PBG. KE-WSTF-346281-CS-INDV / Component one: Delivery of Individual Consult Pending Impleme Monitoring and Evaluation (M IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 2023-05-12 2023-06-30 2023-07-21 2023-08-25 2025-02-15 ant Selection ntation &E) Consultant to support W es to priority areas STF PIU Page 2 KE-WSTF-346285-CS-INDV / Component one: Delivery of Individual Consult Pending Impleme Procurement specialist suppo IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 2023-05-12 2023-06-30 2023-07-21 2023-08-25 2025-02-15 ant Selection ntation rt to the 5 Counties through es to priority areas WSTF KE-WSTF-346290-CS-INDV / Component one: Delivery of Individual Consult Gender Based Violence Cons IDA / 70820 inclusive groundwater servic Post Open - National 100,000.00 0.00 Canceled 2023-05-12 2023-05-22 2023-06-30 2023-07-21 2023-08-25 2025-02-15 ant Selection ultant to support PIUs and SP es to priority areas IUs through WSTF KE-WSTF-363462-CS-INDV / Component one: Delivery of Individual Consult Under Implement Gender Based Violence Cons IDA / 70820 inclusive groundwater servic Post Limited 100,000.00 0.00 2023-05-31 2023-05-28 2023-06-05 2023-06-26 2023-07-31 2025-07-30 ant Selection ation ultant to support PIUs and SP es to priority areas IUs through WSTF Page 3 PROCUREMENT PLAN (Textual Part) Project information: India- Innovation in Solar Power and Hybrid Technology (P160379) Project Implementation agency: Solar Energy Corporation of India (SECI) Date of the Procurement Plan: 15th May 2018 Period covered by this Procurement Plan: ist 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in NCP conditions, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Not Applicable Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Not Applicable Other Relevant Procurement Information. Proposed Procedures for CDD Components: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project will use a procurement manual, which will be agreed with World Bank 5. Any Other Special Procurement Arrangements: Retroactive financing is applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic nts Prefe by Bank Cost rence (Prior / US$ (yes/ Post) million no) Summary 0 0 NA NA of the ICB (Works) Summary 400 3 No Prior Nil of the ICB review (Goods) Summary 0 0 NA NA of the NCB (Works) Summary Nil of the NCB (Goods) Summary Nil of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: As agreed in Procurement Plan Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 1,000,000 2. Single Source (Firms) Do 3. Individual Above US$ 300,000 2. Any Other Special Selection Arrangements: Retroactive financing applicable 3. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s s Assignmen by Bank t Cost US$ (Prior / Post) million Summary 3 1 Prior Nil of number review of contracts that will be let under QCBS Summary 0.1 1 Post Nil of number review of contracts that will be let under other methods PROCUREMENT India : Innovation in Solar Power and Hybrid Technologies PLAN General Information Country: India 2018-05-16 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160379 GPN Date: 2018-02-19 Project Name: Innovation in Solar Power and Hybrid Technologies Loan / Credit No: / , TF / A9875, IBRD / 89440 Solar Energy Corporation of India Limited Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned IN-SECI -178086-GO-RFB / D esign, Engineering, Supply, C Component A: Investments i onstruction, Erection, Testing n Innovative RE Technologie & Commissioning of 100 MW s & BESS (Estimated Cost: U Open - Internationa Single Stage - Two E 115,000,000. 104,994,76 2021-06-1 (AC) Solar PV Project (200M IBRD / 89440 S$398 million of which IBRD Prior Request for Bids Signed 2020-06-30 2020-09-01 2020-07-15 2020-09-08 2020-08-26 2021-01-14 2020-11-08 2021-07-14 2020-12-13 2021-12-16 l nvelope 00 2.73 1 Wp DC capacity) along with 5 Loan: US$1 50 million; CTF l 0MW/150 MWh Battery Energ oan: US$28 million; and CTF y Storage System having 10 Grant: US$20 million) years plant O&M at Rajnandg aon, Chhattisgarh, India IN-SECI -269243-CW-RFB / D Component A: Investments i esign, Engineering, Supply, C n Innovative RE Technologie Request for Bids - onstruction, Erection, Testing s & BESS (Estimated Cost: U Open - Internationa Single Stage - Two E Works (without pr 83,921,333.0 Under Imple 2022-11-1 & Commissioning of 100 MW IBRD / 89440 S$398 million of which IBRD Prior Request for Bids 0.00 2021-12-17 2021-12-21 2021-12-22 2022-02-15 2022-02-02 2022-05-22 l nvelope equalification) SP 0 mentation 8 (AC) Floating Solar PV Project Loan: US$1 50 million; CTF l D having 10 years plant O&M a oan: US$28 million; and CTF t Getalsud Dam, Ranchi, Jhar Grant: US$20 million) khand India IN-SECI -359689-CW-RFB / Rf Component A: Investments i B for the Design, Engineering n Innovative RE Technologie Request for Bids - , Supply, Construction, Erecti s & BESS (Estimated Cost: U Open - Internationa Single Stage - Two E Works (without pr 68,641,531.0 Under Imple 2024-04-0 on, Testing & Commissioning IBRD / 89440 S$398 million of which IBRD Prior Request for Bids 0.00 2023-05-02 2023-05-23 2023-05-07 2023-05-23 2023-06-18 2023-10-05 l nvelope equalification) SP 0 mentation 2 of 100 MW (AC) Floating Sola Loan: US$1 50 million; CTF l D r PV Project having 10 years oan: US$28 million; and CTF plant O&M at Getalsud Dam, Grant: US$20 million) Ranchi, Jharkhand India GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-SECI -70569-GO-RFB / De Component A: Investments i sign, supply and installation n Innovative RE Technologie of 160 MW solar-wind hybrid s & BESS (Estimated Cost: U Open - Internationa Single Stage - Two E power project with energy st / S$398 million of which IBRD Prior Request for Bids 145,000,000.00 0.00 Canceled 2018-07-23 2018-07-31 2018-09-14 2018-11-30 2028-11-30 l nvelope orage solution including 10 y Loan: US$1 50 million; CTF l ears of operations & mainten oan: US$28 million; and CTF ance in Ramgiri District of th Grant: US$20 million) e state of Andhra Pradesh un der ICB IN-SECI -73763-GO-RFB / De Component A: Investments i sign, supply and installation n Innovative RE Technologie of 160 MW solar-wind hybrid s & BESS (Estimated Cost: U power project with energy st Open - Internationa Single Stage - Two E / S$398 million of which IBRD Prior Request for Bids 145,000,000.00 0.00 Canceled 2018-08-13 2018-08-15 2018-08-17 2018-10-01 2018-11-14 2018-11-23 2019-02-27 2018-12-07 2030-06-06 orage solution including 10 y l nvelope Loan: US$1 50 million; CTF l ears of operations & mainten oan: US$28 million; and CTF ance in Ramgiri District of th Grant: US$20 million) e State of Andhra Pradesh un der ICB bidding process NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-SECI -101391-CS-QCBS / Component B: Technical Assi Provision of Owners Engineer stance, Capacity Building, I (OE) services for 160 MW Sol mplementation Support, Mo Quality And Cost- Open - Internationa Under Implement / Post 426,757.00 0.00 2019-02-18 2019-02-28 2019-03-11 2019-02-27 2019-04-24 2019-05-22 2019-06-21 2019-07-26 2019-08-30 2020-08-29 ar-Wind Storage Project in An nitoring and Dissemination ( Based Selection l ation dhra Pradesh, India During D Estimated Cost : US$1.81 mi esign, Construction, Commis llion of which CTF Grant: US sioning and Operations $1.81 million) IN-SECI -126028-CS-QCBS / Component B: Technical Assi Selection of Consultant for th stance, Capacity Building, I e DPR & Bathymetric study o mplementation Support, Mo Quality And Cost- Open - Internationa Pending Impleme TF / A9875 Post 200,000.00 0.00 2019-08-09 2019-08-28 2019-10-11 2019-11-08 2019-12-08 2020-01-12 2020-02-16 2021-02-15 f SECI's 150 MW Floating Sol nitoring and Dissemination ( Based Selection l ntation ar Project at Getalsud, Jharkh Estimated Cost : US$1.81 mi and, India llion of which CTF Grant: US $1.81 million) IN-SECI -214410-CS-QCBS / Direct RfP for the Selection of Component B: Technical Assi Consultancy Firm for Owners stance, Capacity Building, I Engineer (OE) services for 10 mplementation Support, Mo Quality And Cost- Open - Internationa Under Implement 0 MW (AC) Solar PV Project ( IBRD / 89440 nitoring and Dissemination ( Prior 564,088.00 0.00 2021-01-18 2021-02-04 2021-02-08 2021-02-04 2021-03-24 2021-09-21 2021-04-21 2021-08-16 2021-05-21 2021-10-24 2021-06-25 2021-07-30 2022-07-30 Based Selection l ation 160MWp DC capacity) along Estimated Cost : US$1.81 mi with 40MW/120 MWh Battery llion of which CTF Grant: US Energy Storage System at dis $1.81 million) trict Rajnandgaon, Chhattisg arh, India during DSI IN-SECI -360779-CS-QCBS / Component B: Technical Assi Rfp for the Owners Engineer stance, Capacity Building, I (OE) services for 100 MW (AC mplementation Support, Mo ) Solar PV Project (160MWp D Quality And Cost- Open - Internationa Pending Impleme IBRD / 89440 nitoring and Dissemination ( Post 780,487.00 0.00 2023-05-09 2023-05-30 2023-07-13 2023-08-10 2023-09-09 2023-10-14 2023-11-18 2024-11-17 C capacity) along with 40MW Based Selection l ntation Estimated Cost : US$1.81 mi /120 MWh BESS Rajnandgaon llion of which CTF Grant: US , Chhattisgarh & 100 MW (AC $1.81 million) ) Floating Solar PV Project on the Getalsud, Ranchi, Jharkha nd India Page 1 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IN-SECI -62536-CS-CDS / Sel Component B: Technical Assi ection of Owner's Engineer ( stance, Capacity Building, I OE) services during Bid prep mplementation Support, Mo / Post Direct Selection Direct 76,900.00 38,218.21 Signed 2018-05-15 2018-06-08 2018-05-18 2018-06-08 2018-05-31 2018-11-01 2018-11-30 aration and tendering stage f nitoring and Dissemination ( or SECI's 160 MW Solar-Wind Estimated Cost : US$1.81 mi Hybrid Power Plant. llion of which CTF Grant: US $1.81 million) Page 2 PROCUREMENT PLAN (Textual Part) 1. Project Information Country: Rwanda 2. Project Name: Access to Finance for Recovery and Resilience Project (AIFRR) 3. Project ID: P175273 4. Project Implementation Agency: Business Development Fund 5. Date of the Procurement Plan: July 27, 2021 6. Period Covered by this procurement plan: August 2021 – Feb 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Rwanda Public Procurement Law (Law No. 12 of 2007), such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Other Relevant Procurement Information. None PROCUREMENT Rwanda : Access to Finance for Recovery and Resilience Project PLAN General Information Country: Rwanda 2021-07-29 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175273 GPN Date: Project Name: Access to Finance for Recovery and Resilience Project Loan / Credit No: IDA / 69260, TF / B5809 Business Development Fund Ltd Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-BDF-327506-GO-RFB / P Component 3 – Institutional Single Stage - One E Pending Impl urchase of Server and IT net TF / B5809 Strengthening and Impleme Post Request for Bids Open - National 0.00 2023-03-05 2023-03-10 2023-04-21 2023-05-21 2023-06-25 2023-09-24 nvelope ementation work infrastructure ntation Support NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-BDF-245720-CS-QCBS / Recruitment of consultancy fi Component 3 – Institutional Quality And Cost- rm to conduct an extended s IDA / 69260 Strengthening and Impleme Post Open - National 0.00 Canceled 2021-07-30 2021-12-07 2021-08-20 2022-03-28 2021-09-24 2021-10-22 2021-11-12 2021-12-17 2022-01-21 2022-03-22 Based Selection urvey on PFI satisfaction and ntation Support develop a satisfaction index RW-BDF-245816-CS-QCBS / Recruitment of Consultancy f Component 3 – Institutional Quality And Cost- Under Implement irm to conduct needs assess IDA / 69260 Strengthening and Impleme Post Open - National 0.00 2021-08-05 2022-03-02 2021-08-26 2022-03-28 2021-09-30 2022-04-28 2021-10-28 2021-11-18 2021-12-23 2022-01-20 2022-04-10 Based Selection ation ment and development of co ntation Support mprehensive capacity buildin g program RW-BDF-245823-CS-QCBS / Component 3 – Institutional Recruitment of a consultancy Quality And Cost- Under Implement IDA / 69260 Strengthening and Impleme Post Open - National 0.00 2021-08-05 2022-03-02 2021-08-26 2022-06-24 2021-09-30 2021-10-28 2021-11-18 2021-12-23 2022-01-20 2022-04-20 firm for Expansion of BDS d Based Selection ation ntation Support elivery mechanism RW-BDF-327468-CS-QCBS / Recruitment of a Consulting f Component 3 – Institutional irm to conduct a feasibility st Quality And Cost- Under Implement TF / B5809 Strengthening and Impleme Post Open - National 0.00 2022-12-05 2023-03-29 2022-12-26 2023-04-26 2023-02-08 2023-03-08 2023-04-07 2023-05-12 2023-06-16 2024-06-15 udy of Implementing a Busin Based Selection ation ntation Support ess Development Fund -BDF- Integrated Management Infor mation System -MIS- RW-BDF-327520-CS-QCBS / Component 3 – Institutional Quality And Cost- Pending Impleme Acquisition of digital paymen TF / B5809 Strengthening and Impleme Post Open - National 0.00 2023-05-02 2023-05-23 2023-07-06 2023-08-03 2023-09-02 2023-10-07 2023-11-11 2024-11-10 Based Selection ntation t channels ntation Support RW-BDF-245805-CS-QCBS / Component 3 – Institutional Quality And Cost- Pending Impleme Procurement of an Integrated TF / B5809 Strengthening and Impleme Post Open - National 0.00 2023-03-05 2023-03-26 2023-04-30 2023-05-28 2023-05-30 2023-07-04 2023-08-01 2024-07-31 Based Selection ntation MIS&M&E System ntation Support RW-BDF-295933-CS-QCBS / Component 3 – Institutional Quality And Cost- Acquisition of an M&E Syste IDA / 69260 Strengthening and Impleme Post Open - National 0.00 Canceled 2022-05-24 2022-06-20 2022-06-14 2022-07-28 2022-08-25 2022-09-24 2022-10-29 2022-12-03 2023-12-03 Based Selection m for BDF ntation Support RW-BDF-245820-CS-QCBS / Component 3 – Institutional Recruitment of Consultancy f Quality And Cost- IDA / 69260 Strengthening and Impleme Post Open - National 0.00 Canceled 2021-08-05 2021-08-26 2021-09-11 2021-10-09 2021-11-08 2021-12-13 2022-01-17 2023-01-17 irm to develop and implemen Based Selection ntation Support t training modules and manu als RW-BDF-245811-CS-QCBS / Recruitment of a consultancy Component 3 – Institutional Quality And Cost- firm to provide a technical su IDA / 69260 Strengthening and Impleme Post Open - National 0.00 Canceled 2021-08-05 2021-08-26 2021-09-11 2021-10-09 2021-10-11 2021-11-15 2021-12-13 2021-12-17 Based Selection pport in service delivery, pro ntation Support cess review and improvemen t INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RW-BDF-245658-CS-INDV / R Component 3 – Institutional ecruitment of an expert to un Individual Consult IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2021-07-30 2021-09-08 2021-09-22 2021-10-20 2021-12-19 dertake guarantee product re ant Selection ntation Support view (model, procedures, pri cing structure, etc…) RW-BDF-245814-CS-INDV / R ecruitment of an individual c Component 3 – Institutional Individual Consult onsultant for Bridge Lending IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2021-08-05 2021-09-14 2021-10-05 2021-11-02 2022-05-01 ant Selection Window Product developmen ntation Support t, product prototype test, pro duct launch RW-BDF-245824-CS-INDV / R Component 3 – Institutional Individual Consult Under Implement ecruitment of E&S specialists IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-26 2021-10-24 2026-10-23 ant Selection ation (2) ntation Support Page 1 Component 3 – Institutional RW-BDF-245826-CS-INDV / R Individual Consult Under Implement IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-26 2021-10-24 2026-10-23 ecruitment of Project Officer ant Selection ation ntation Support RW-BDF-245829-CS-INDV / R Component 3 – Institutional Individual Consult Under Implement ecruitment of Financial mana IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-26 2021-10-24 2026-10-23 ant Selection ation gement specialist ntation Support RW-BDF-245832-CS-INDV / R Component 3 – Institutional Individual Consult Under Implement ecruitment of Procurement s IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-26 2021-10-24 2026-10-23 ant Selection ation pecialist ntation Support RW-BDF-245834-CS-INDV / R Component 3 – Institutional Individual Consult Under Implement ecruitment of Bridge Lending IDA / 69260 Strengthening and Impleme Post Open 0.00 2021-08-03 2021-07-30 2021-09-12 2022-02-01 2021-09-13 2021-10-11 2026-10-10 ant Selection ation Window coordinator ntation Support RW-BDF-274516-CS-INDV / I nternational expert to undert Component 2 – Risk Sharing Individual Consult IDA / 69260 Post Open 0.00 Signed 2022-01-24 2022-02-28 2022-03-14 2022-08-12 2022-04-04 2022-08-24 2022-05-09 2022-11-05 ake guarantee product revie Facility ant Selection w (model, procedures, pricin g structure, etc.…) RW-BDF-274816-CS-INDV / I nternational expert to undert Component 2 – Risk Sharing Individual Consult IDA / 69260 Post Open 0.00 Canceled 2022-01-24 2022-03-14 2022-04-04 2022-05-09 2022-11-05 ake guarantee product revie Facility ant Selection w (model, procedures, pricin g structure, etc.…) RW-BDF-295943-CS-INDV / R ecruitment of an individual c Component 3 – Institutional Individual Consult onsultant to analyse BDF bus IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2022-05-24 2022-06-10 2022-07-12 2022-08-02 2022-09-06 2023-03-05 ant Selection iness, to review technical req ntation Support uirement and develop ToRs f or BDF integrated MIS RW-BDF-290330-CS-INDV / R ecruitment of an individual c Component 3 – Institutional Individual Consult onsultant to conduct an exte IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2022-04-13 2022-05-16 2022-06-06 2022-07-11 2022-10-09 ant Selection nded survey on PFI satisfacti ntation Support on and develop a satisfaction index RW-BDF-245802-CS-INDV / R Component 3 – Institutional ecruitment of a Legal and fin Individual Consult IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2021-08-05 2021-09-14 2021-09-15 2021-10-13 2021-11-27 ance expert to review MOU ( ant Selection ntation Support Partial Credit guarantee agre ements with PFIs) RW-BDF-245821-CS-INDV / R Component 3 – Institutional ecruitment of an Individual C Individual Consult IDA / 69260 Strengthening and Impleme Post Open 0.00 Canceled 2021-08-05 2021-09-14 2021-10-05 2021-11-02 2026-11-01 onsultant for provision of Bus ant Selection ntation Support iness Development Services RW-BDF-360862-CS-INDV / C Component 3 – Institutional Individual Consult Under Implement USTOMER RELATIONSHIP MA TF / B5809 Strengthening and Impleme Post Open - National 0.00 2023-06-04 2023-05-24 2023-07-23 2023-08-13 2023-09-17 2025-09-16 ant Selection ation NAGER ntation Support Page 2 PROCUREMENT PLAN Project information: SOLOMON ISLANDS COVID-19 EMERGENCY RESPONSE PROJECT (P173933) Project Implementation agency: Ministry of Health and Medical Services (MHMS) Ministry of Infrastructure and Development (MID) Date of the Procurement Plan: 1815 DecemberOctober 2020 Period covered by this Procurement Plan: 01 November February 202120 to 30 AugustApril 20212 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) Only the model bidding documents acceptable to the World Bank shall be used for all national open competitive procurement. 2) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 3) The request for bids/request for proposals document shall require that Bidders/ Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the 1 Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) There shall be no negotiations of contract price at post contract stage or termination of the contract - on grounds of operation of Price Adjustment stipulated in a signed contract exceeding a specified percentage. 6) No preference of any kind shall be given to national bidders in the bidding process. When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. HEIS is recommended for this project. Other Relevant Procurement Information. Since this is an emergency response project there will be no prior review for all procurement during the relief phase. Procurement of items for emergency requirements will follow methods of Direct Contracting, Procurement from UN Agencies, Limited bidding, etc. This project will also have higher value threshold for shopping and National procurement, as applicable in emergency projects. 2 3 Ministry of Health and Medical Services (MHMS) Project Name: SI COVID-19 Emergency Response Project (P173933) Period Covered: from 01 November 2020 to 30 April 2022 (18 Months) N Description Ref Procurem Procurem Estimated Bank Revie Planned o. . ent ent Amount Financ w Start No. Category Method US$ ed % Type Date (Must be in YYYY/MM / DD format) 1 Personal GO UN or DIR 200,000.00 100 Post 20210/02 Protective 12/151 Equipment, Test Kits, Lab Consumables 2 Renovation of CW DIR 500,000.00 100 Post 20210/02 Quarantine 12/15 Facilities (by MID) 3 Renovation of CW DIR 200,000.00 100 Post 2021/021/ Isolation Units - 1530 Church Health Facilities 4 Waste GO DIR 300,000.00 100 Post 20210/02 Management 11/1530 Trucks (4 units) 5 Renovation CW RFP 1,400,000. 100 Post 2021/02/2 Provincial 00 8 Hospitals 6 Procurement of GO RFP 300,000.00 100 Post 2021/04/3 Incinerators 0 7 Refurbish of CW RFP 400,000.00 100 Post 2021/05/0 Zome into 1 National Hospital Emergency Center (NHEC) 8 Refurbish CW RFP 600,000.00 100 Post 2021/06/0 National Medical 1 Store (NMS) 9 Project CS INDV 45,000.00 100 Post 20210/02 Manager/Coordin 11/15 ator (Level 12) 10 Procurement CS INDV 35,000.00 100 Post 20210/02 Officer (Level 10) 11/15 11 Finance Officer CS INDV 35,000.00 100 Post 20210/02 (Level 10) 11/15 12 Safeguards CS INDV 35,000.00 100 Post 20210/02 Officer (Level 10) 11/15 13 Monitoring and CS INDV 35,000.00 100 Post 20210/02 Evaluation Officer 11/15 (Level 10) 14 Training NCS CDS 150,000.00 100 Post 2021/04/3 warehouse 0 and management) beyond thereafter 15 TA for COVID-19 CS INDV 80,000 100 Post 2021/021/ 1501 4 5 PROCUREMENT Solomon Islands : Solomon Islands COVID-19 Emergency Response Project PLAN General Information Country: Solomon Islands 2021-03-10 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173933 GPN Date: Project Name: Solomon Islands COVID-19 Emergency Response Project Loan / Credit No: IDA / D6280, IDA / 66330, IDA / E0250 Ministry of Health and Medical Services Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Quota SB-MHMS-247403-CW-DIR / Emergency COVID-19 Prepar Request for Quota Single Stage - One E tions - Small Work Pending Imp 2024-03-0 Renovation of Helena Goldie IDA / 66330 Post Open - National 725,000.00 0.00 2023-07-14 2023-09-08 edness and Response tions nvelope s (Emergency) SP lementation 6 Hospital Western Province D -Competitive Request for Quota SB-MHMS-247406-CW-DIR / Emergency COVID-19 Prepar Request for Quota Single Stage - One E tions - Small Work Under Imple 2023-06-0 Refurbish National Medical St IDA / 66330 Post Open - National 600,000.00 0.00 2022-10-08 2022-12-03 edness and Response tions nvelope s (Emergency) SP mentation 1 ore (NMS) D -Competitive Request for Quota SB-MHMS-247398-CW-DIR / tions - Small Work Emergency COVID-19 Prepar Pending Imp 2023-10-1 Renovation of Isolation Unit - IDA / 66330 Post Direct Selection Direct - National s (Emergency) SP 100,000.00 0.00 2023-03-13 2023-03-18 2023-04-22 edness and Response lementation 9 Church Health Facility 1. Atoi D -Non Competiti fi Hospital. ve Request for Quota SB-MHMS-306758-CW-DIR / tions - Small Work Renovation of Isolation Unit - Emergency COVID-19 Prepar Pending Imp 2023-10-1 IDA / 66330 Post Direct Selection Direct - National s (Emergency) SP 100,000.00 0.00 2023-03-13 2023-03-18 2023-04-22 Church Health facility 2. Goo edness and Response lementation 9 D -Non Competiti d Samaritan Hospital. ve Request for Quota SB-MHMS-247402-CW-DIR / Emergency COVID-19 Prepar Request for Quota Single Stage - One E tions - Small Work Pending Imp 2024-03-0 Renovation Tulagi Provincial IDA / 66330 Post Open - National 725,000.00 0.00 2023-07-14 2023-09-08 edness and Response tions nvelope s (Emergency) SP lementation 6 Hospitals D -Competitive Request for Quota SB-MHMS-247397-CW-DIR / Emergency COVID-19 Prepar Request for Quota Single Stage - One E tions - Small Work Pending Imp 2023-11-0 Renovation of Quarantine Fa IDA / 66330 Post Limited 500,000.00 0.00 2023-03-18 2023-05-13 edness and Response tions nvelope s (Emergency) SP lementation 9 cility for Nila, Shortland. D -Competitive Request for Quota SB-MHMS-320706-CW-RFQ / Emergency COVID-19 Prepar Request for Quota Single Stage - One E tions - Small Work 2023-06-2 Survey for Civil work sites an IDA / D6280 Post Open - National 60,000.00 0.00 Signed 2022-11-02 2023-03-05 2022-12-28 edness and Response tions nvelope s (Emergency) SP 6 d incinerator site preparation D -Competitive . Request for Quota SB-MHMS-320707-CW-RFQ / Emergency COVID-19 Prepar Request for Quota Single Stage - One E tions - Small Work 2023-06-2 UXO for Civil work sites and I IDA / D6280 Post Open - National 70,000.00 0.00 Signed 2022-11-02 2023-03-05 2022-12-28 edness and Response tions nvelope s (Emergency) SP 6 ncinerator sites. D -Competitive Request for Quota SB-MHMS-320709-CW-RFQ / Emergency COVID-19 Prepar Request for Quota Single Stage - One E tions - Small Work 2023-06-2 GEOTECH for Civil work sites IDA / D6280 Post Open - National 110,000.00 0.00 Signed 2022-11-02 2023-03-05 2022-12-28 edness and Response tions nvelope s (Emergency) SP 6 and Incinerator sites. D -Competitive Request for Quota SB-MHMS-306760-CW-RFQ / Health Systems Strengtheni Request for Quota Single Stage - One E tions - Small Work 2024-03-0 IDA / E0250 Post Open - National 600,000.00 0.00 Canceled 2023-07-14 2023-09-08 Renovation for Taro Hospital. ng tions nvelope s (Emergency) SP 6 D -Competitive SB-MHMS-247405-CW-DIR / Request for Quota Refurbishment of Zome into Health Systems Strengtheni Request for Quota Single Stage - One E tions - Small Work Pending Imp 2022-04-2 IDA / 66330 Post Open - National 400,000.00 0.00 2021-08-30 2021-10-25 national Hospital Emergency ng tions nvelope s (Emergency) SP lementation 3 Centre (NHEC) (Reallocate to D -Competitive MHMS - NHEOC). Request for Quota SB-MHMS-306761-CW-RFQ / Health Systems Strengtheni Request for Quota Single Stage - One E tions - Small Work 2024-03-0 Renovation of Wagina Hospit IDA / E0250 Post Open - National 400,000.00 0.00 Canceled 2023-07-14 2023-09-08 ng tions nvelope s (Emergency) SP 6 al. D -Competitive GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SB-MHMS-247387-GO-DIR / Emergency COVID-19 Prepar Personnel Protective Equipm IDA / 66330 Post Direct Selection Direct 66,000.00 46,869.09 Completed 2021-08-10 2021-11-16 2021-08-15 2021-12-21 2021-09-19 2022-02-11 2022-03-18 2022-03-01 edness and Response ent's for COVID19 activities SB-MHMS-247396-GO-DIR / L Emergency COVID-19 Prepar IDA / 66330 Post Direct Selection Direct 68,000.00 68,472.24 Signed 2021-08-10 2021-11-18 2021-08-15 2021-11-18 2021-09-19 2022-05-26 2022-03-18 ab consumables edness and Response SB-MHMS-247400-GO-DIR / Emergency COVID-19 Prepar IDA / 66330 Prior Direct Selection Direct 300,000.00 0.00 Canceled 2021-08-10 2021-10-27 2021-08-15 2021-09-19 2022-03-18 Four waste Management Tru edness and Response cks SB-MHMS-247394-GO-DIR / Emergency COVID-19 Prepar Test Kits for COVID19 emerg IDA / 66330 Post Direct Selection Direct 66,000.00 66,770.23 Completed 2021-08-10 2021-11-16 2021-08-15 2021-12-21 2021-09-19 2022-05-26 2022-03-18 2022-06-01 edness and Response ency activities SB-MHMS-247404-GO-DIR / Emergency COVID-19 Prepar Request for Quota Open - Internationa Single Stage - One E IDA / 66330 Post 300,000.00 274,095.84 Signed 2021-08-29 2022-05-17 2021-10-24 2022-08-19 2022-04-22 Procurement of incinerators edness and Response tions l nvelope SB-MHMS-247410-GO-DIR / Project Implementation Man Request for Quota Single Stage - One E Procurement of office Equip IDA / 66330 agement, Monitoring and Ev Post Limited 100,000.00 8,901.75 Completed 2021-09-25 2021-08-16 2021-11-20 2021-08-24 2022-05-19 2021-09-03 tions nvelope ment's (Laptops etc.) aluation SB-MHMS-250136-GO-RFQ / Emergency COVID-19 Prepar Request for Quota Single Stage - One E IDA / 66330 Post Limited 200,000.00 35,568.00 Completed 2021-09-27 2021-09-08 2021-11-22 2022-04-18 2022-05-21 2023-04-17 Vehicle for Project Managem edness and Response tions nvelope ent Unit SB-MHMS-260470-GO-DIR / Emergency COVID-19 Prepar Seven Waste Disposal Manag IDA / 66330 Post Direct Selection Direct 300,000.00 297,137.57 Completed 2021-10-29 2021-12-20 2021-11-03 2021-12-19 2021-12-08 2021-11-20 2022-06-06 2022-01-01 edness and Response ement Trucks. SB-MHMS-284386-GO-DIR / Supply and Installation of Eig ht new 70kw ducted Daikin A Health Systems Strengtheni IDA / D6280 Post Direct Selection Direct 250,000.00 216,268.95 Completed 2022-04-06 2022-05-11 2022-04-11 2022-05-20 2022-05-16 2022-04-28 2022-11-12 2022-05-06 ir Condition to National Medic ng al Store, Ranadi - Ministry of Health and Medical Services. Page 1 SB-MHMS-302763-GO-RFQ / Twenty Boats and Outboard Emergency COVID-19 Prepar Request for Quota Single Stage - One E IDA / E0250 Post Limited 200,000.00 0.00 Signed 2022-08-05 2022-10-11 2022-09-30 2023-03-29 motors to support COVID-19 edness and Response tions nvelope Vaccine Deployment. SB-MHMS-301565-GO-DIR / Emergency COVID-19 Prepar National Public Health Lab Re IDA / E0250 Post Direct Selection Direct - National 75,000.00 0.00 Signed 2022-07-15 2022-08-26 2022-07-20 2022-09-13 2022-08-24 2023-02-20 edness and Response agents and Consumables. SB-MHMS-301867-GO-RFQ / Emergency COVID-19 Prepar Request for Quota Single Stage - One E Twenty one Outboard Motors IDA / E0250 Post Limited 200,000.00 0.00 Canceled 2022-08-05 2022-09-30 2023-03-29 edness and Response tions nvelope for COVID-19 Vaccine Deploy ment. SB-MHMS-320491-GO-RFQ / Emergency COVID-19 Prepar Request for Quota Single Stage - One E Vehicles to support vaccine d IDA / E0250 Post Open - National 600,000.00 0.00 Signed 2022-10-22 2023-02-08 2022-12-17 2023-06-15 edness and Response tions nvelope eployment SB-MHMS-300810-GO-DIR / Emergency COVID-19 Prepar Direct - Internation NRH Lab Reagents and Cons IDA / E0250 Post Direct Selection 75,000.00 0.00 Canceled 2022-07-26 2022-08-22 2022-07-31 2022-09-13 2022-09-04 2023-03-03 edness and Response al umables for COVID-19 operat ion. SB-MHMS-362567-GO-RFQ / Emergency COVID-19 Prepar Request for Quota Open - Internationa Single Stage - One E Under Imple NRH Lab Reagents and Cons IDA / E0250 Post 75,000.00 0.00 2023-05-31 2023-07-26 2024-01-22 edness and Response tions l nvelope mentation umables (New) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SB-MHMS-247408-NC-DIR / T Emergency COVID-19 Prepar rainings (Warehouse manage IDA / 66330 Post Direct Selection Direct 150,000.00 0.00 Canceled 2021-08-10 2021-08-15 2021-09-19 2022-03-18 edness and Response ment, IPC, Surveillance and GBV CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SB-MHMS-362569-NC-RFQ / Project Implementation Man Consultant Qualifi IDA / D6280 Post Open - National 45,000.00 0.00 Under Review 2023-05-26 2023-06-26 2023-06-16 2023-07-30 2023-08-29 2023-10-03 2024-03-31 Financial Audit agement, Monitoring and Ev cation Selection aluation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SB-MHMS-223460-CS-INDV / Project Implementation Man Individual Consult IDA / D6280 Post Open 40,000.00 45,000.00 Terminated 2021-04-01 2021-04-12 2021-05-20 2022-03-02 2021-06-10 2022-03-02 2021-07-15 2021-08-20 2022-01-11 Program manager full time agement, Monitoring and Ev ant Selection aluation SB-MHMS-233128-CS-INDV / Emergency COVID-19 Prepar Individual Consult IDA / 66330 Post Open 20,000.00 20,000.00 Signed 2021-06-14 2021-10-29 2021-08-02 2022-05-23 2021-08-23 2022-06-23 2021-09-27 2022-05-30 2022-03-26 International Safeguard Spec edness and Response ant Selection ialist SB-MHMS-228757-CS-INDV / Project Implementation Man Individual Consult IDA / 66330 Post Open 35,000.00 35,000.00 Signed 2021-08-03 2021-04-12 2021-09-21 2022-03-02 2021-10-12 2022-03-09 2021-11-16 2021-08-26 2022-05-15 Financial Management Office agement, Monitoring and Ev ant Selection r aluation SB-MHMS-228758-CS-INDV / Project Implementation Man Individual Consult IDA / 66330 Post Open 35,000.00 35,000.00 Signed 2021-08-03 2021-04-12 2021-09-21 2022-05-23 2021-10-12 2022-05-23 2021-11-16 2021-09-11 2022-05-15 Procurement Officer agement, Monitoring and Ev ant Selection aluation SB-MHMS-228760-CS-INDV / Project Implementation Man Individual Consult IDA / 66330 Post Open 35,000.00 35,000.00 Completed 2021-08-03 2021-04-12 2021-09-21 2022-03-02 2021-10-12 2022-03-03 2021-11-16 2021-08-26 2022-05-15 2023-01-11 Safeguard Officer (Local) agement, Monitoring and Ev ant Selection aluation SB-MHMS-228761-CS-INDV / Project Implementation Man Individual Consult IDA / 66330 Post Open 35,000.00 35,000.00 Completed 2021-08-03 2021-04-12 2021-09-21 2022-03-02 2021-10-12 2022-03-11 2021-11-16 2021-10-22 2022-05-15 2023-01-11 Monitoring & Evaluation Offic agement, Monitoring and Ev ant Selection er aluation SB-MHMS-240686-CS-INDV / Emergency COVID-19 Prepar Individual Consult IDA / D6280 Post Open 35,000.00 81,979.07 Signed 2021-08-03 2021-04-12 2021-09-21 2022-05-23 2021-10-12 2022-05-26 2021-11-16 2022-06-14 2022-05-15 Infrastructure Officer (local) edness and Response ant Selection SB-MHMS-301855-CS-CDS / I Emergency COVID-19 Prepar Individual Consult nternational Technical Assist IDA / E0250 Prior Direct - National 441,850.00 0.00 Completed 2022-08-25 2022-11-10 2022-09-04 2021-10-01 2022-09-25 2023-01-25 2022-10-30 2023-04-28 2023-02-19 edness and Response ant Selection ance for Covid-19 SB-MHMS-320487-CS-INDV / Project Implementation Man Individual Consult IDA / D6280 Post Open - National 40,000.00 0.00 Signed 2022-10-11 2022-10-25 2022-11-29 2022-11-19 2022-12-20 2022-11-22 2023-01-24 2023-07-23 Project Manager - New agement, Monitoring and Ev ant Selection aluation SB-MHMS-339434-CS-INDV / Emergency COVID-19 Prepar Individual Consult Under Implement IDA / 66330 Post Open - National 52,000.00 0.00 2023-02-10 2023-02-13 2023-03-31 2023-06-14 2023-04-21 2023-06-15 2023-05-26 2023-11-22 Safeguard Officer Local (New edness and Response ant Selection ation ) SB-MHMS-339436-CS-INDV / Emergency COVID-19 Prepar Individual Consult IDA / 66330 Post Open - National 52,000.00 0.00 Signed 2023-02-10 2023-02-14 2023-03-31 2023-04-05 2023-04-21 2023-04-06 2023-05-26 2023-11-22 Monitoring & Evaluation Offic edness and Response ant Selection er (New) SB-MHMS-362562-CS-INDV / Project Implementation Man Computer Aided Drafting and Individual Consult Under Implement IDA / D6280 agement, Monitoring and Ev Post Direct - National 13,143.23 0.00 2023-05-24 2023-06-15 2023-06-03 2023-06-26 2023-06-24 2023-07-29 2024-01-25 Design (CADD) Technician - I ant Selection ation aluation nfrastructure Supporting offic er. SB-MHMS-362565-CS-INDV / Project Implementation Man Individual Consult Under Implement Civil/Structural Engineer Con IDA / D6280 agement, Monitoring and Ev Post Direct - National 38,253.51 0.00 2023-05-24 2023-06-15 2023-06-03 2023-06-26 2023-06-24 2023-06-26 2023-07-29 2024-01-25 ant Selection ation sultant - Infrastructure suppo aluation rting officer Page 2 PLAN DE PASSATION DE MARCHES Information sur le Projet : PROJET D’ACCELERATION DE L’ACCES A L’ELECTRICITE AU NIGER. (HASKE-P174034). Agences d’exécution du Projet : NIGELEC, ANPER et ANERSOL Date du plan de passation des marchés : 22 octobre 2021 Période couverte par ce plan de passation des marchés : Décembre 2021 - Juin 2023 Préambule : Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) révisé en Novembre 2017 puis en Août 2018 (“Règlement de Passation des Marchés”), le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du Niger pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans la Loi N°2011-37 du 28 Octobre 2011 portant principes généraux, contrôle and régulation des marchés publics et des délégations de service public au Niger et le Décret N° 2016-641/PRN/PM du 21/Décembre 2016 portant Code des marchés Publics et des Délégations de Service Public, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions qui suivent. Les dispositions à respecter pour un appel d’offres/à propositions ouvert national sont les suivantes : a. le dossier d’appel d’offres/à propositions oblige le Soumissionnaire/Proposant présentant une Offre/Proposition à déposer un agrément signé, qui sera joint à tout contrat éventuel, pour confirmer qu’il applique et respecte les Directives de la Banque pour la lutte contre la corruption, y compris sans limitation, le droit de la Banque de sanctionner et les droits de la Banque pour l’inspection et l’audit ; b. Les documents de passation des marchés incluent des dispositions, convenues avec la Banque, destinées à atténuer de manière adéquate les risques et impacts environnementaux et sociaux (y compris l'exploitation et les abus sexuels et la violence basée sur le genre), l’hygiène et la sécurité (« ESHS ») ; c. les droits de la Banque d’examiner le dossier et les activités de passation des marchés ; d. l’existence d’un mécanisme efficace d’examen des plaintes ; et e. la gestion et l’archivage des dossiers relatifs au Processus de la Passation des Marchés. Les autres modalités nationales de passation des marchés (autres que sous forme d’appel d’offres/à propositions national ouvert) qui pourraient être appliquées par l’Emprunteur (appel d’offres limité/restreint, demande de prix/consultation de fournisseurs, entente directe) doivent être conformes avec les Principes Fondamentaux de Passation des Marchés de la Banque et garantir que les Directives de la Banque contre la corruption, son Cadre de Sanctions et les recours contractuels visés dans l’Accord Juridique s’appliquent. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). - Fournitures : s’applique - Travaux : s’applique L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique. Au besoin. Autres informations pertinentes sur la passation des marchés : Les dispositions contenues dans le « Guide de la Banque mondiale sur les procédures de passation des marchés dans les situations de besoin urgent d’assistance ou de contraintes de capacité publié le 7 mars 2019» s’appliquent au besoin et au cas par cas. Plan de Passation de marchés Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Composante 1 Sous composante 1.1- Construction de l’interconnexion de transmission entre le Réseau Ouest et le Réseau Centre EST- NIGELEC Construction de 270 km Ouverte, ligne 132kV entre Zabori- Internationale (une 71 900 Appel A Priori Octobre 2022 1 Malbaza (lot1 et 2) et 50 km Tvx seule étape et 100 000 d’offres de ligne 66 kV entre Illéla et avec Tahoua NIGELEC (lot 3) préqualification) Construction de nouveaux postes 132/33 kV à Doucthi, Ouverte, Konni et Madaoua à Zabori, Internationale (une 13 100 Appel A Priori 100 Octobre 2022 2 66/33 kV à Tahoua et Tvx seule étape et 000 d’offres extension des postes à avec Zabori et Malbaza (132kV), préqualification) Illela (66 kV) NIGELEC (lot4) Ingénieurs du maître Ouverte, d'ouvrage pour la 5 000 Internationale (sur A Priori 100 Janvier 2022 3 supervision de la Cons SFQC 000 la base d’une liste construction des réseaux de restreinte) transmission – NIGELEC Sous composante 1.2 Ouverte, Densification et 30 000 Appel internationale (en A Priori 100 Janvier 2022 4 renforcement de réseau - Tvx 000 d’offres plusieurs lots, en NIGELEC une seule étape et Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) sans préqualification) Ouverte, Acquisition de matériel pour 40 000 Appel Internationale (une A Priori 100 Février 2022 5 l’électrification rurale - Four 000 d’offres seule étape et sans NIGELEC préqualification) Ouverte, Nationale (en plusieurs lots, 5bi Travaux électrification rurale 10 000 Appel A Priori 100 Mai 2022 Tvx une seule étape et s - NIGELEC 000 d’offres sans préqualification) Ingénieurs du maître Ouverte, d'ouvrage pour la 5 000 Internationale (sur A Priori 100 Janvier 2022 7 supervision de la Cons SFQC 000 la base d’une liste construction des réseaux de restreinte) distribution - NIGELEC Sous composante 1.3 Ouverte, Internationale (en Acquisition de compteurs 6 500 Appel A Priori 100 Janvier 2023 7 Four une seule étape, NIGELEC 000 d’offres sans préqualification) Ouverte, Internationale (en Acquisition de matériels de 8 500 Appel A Priori 100 Janvier 2023 8 Four une seule étape, branchements NIGELEC 000 d’offres sans préqualification) Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Ouverte, Nationale Recrutements d'entreprises (en plusieurs lots, A pour la réalisation des 1 500 9 Tvx Appel en une seule étape Posteriori 100 Avril 2023 travaux de branchements 000 d’offres et sans NIGELEC préqualification) Recrutement d'un consultant Ouverte, pour la conception et l'appui Internationale (sur à la mise en œuvre de la la base d’une liste A 10 subvention des appareils et Cons 700 000 SFQC restreinte) Posteriori 100 Mai 2022 équipements d'usage productifs en milieu rural NIGELEC Composante 2 Sous Composante 2.1 Ouverte, Développement de Internationale (en nouveaux mini-réseaux 18 000 Appel plusieurs lots en A Priori 100 Juin 2022 12 solaires grâce à un Tvx 000 d’offres une seule étape, partenariat public-privé (30 avec sélection à 40 localités) - ANPER initiale) Ouverte, Acquisition de compteurs et Internationale (en 2 000 Appel A Priori 100 Juin 2023 13 matériel de branchements Four une seule étape, 000 d’offres pour l’ANPER sans préqualification) Ouverte, Ingénieur du Maître 2 000 Internationale (sur A Priori 100 14 d'Ouvrage pour la Cons SFQC Septembre 2021 000 la base d’une liste supervision de la restreinte) Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) construction de nouveaux mini-réseaux - ANPER Hybridation solaire et Ouverte, densification des mini- Internationale (en 15 000 Appel A Priori 100 Août 2022 15 réseaux (28 localité avec Tvx une seule étape et 000 d’offres réseau à renforcer) - avec NIGELEC préqualification) Ingénieur du Maître Ouverte, d'Ouvrage pour la 2 000 Internationale (sur A Priori 100 Janvier 2022 16 supervision de l'hybridation Cons SFQC 000 la base d’une liste des mini-réseaux existants - restreinte) NIGELEC Composante 3 Ouverte, Gestionnaire des fonds – 1 700 Internationale (sur A Priori 100 Février 2022 17 Cons SFQC DPED/ANERSOL 000 la base d’une liste restreinte) Ouverte, Agence de vérification 1 200 Internationale (sur A Priori 100 Décembre 2021 18 Cons SFQC indépendante- ANERSOL 000 la base d’une liste restreinte) Sous Composante 3.1 Ouverte, Nationale Travaux Electrification des (en plusieurs lots 11 000 Appel A Priori 100 Octobre 2022 18 écoles et centres de santé – Tvx en une seule 000 d’offres ANERSOL étape, sans préqualification) Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Ouverte, Nationale O&M pendant les deux A (en une seule 20 premières années - cons 400 000 Appel Postériori 100 Novembre 2022 d’offres étape, sans ANERSOL– préqualification) Ouverte, Nationale Électrification des (en plusieurs lots A infrastructures publiques 1 000 21 Tvx Appel en une seule Posteriori 100 Janvier 2023 (éclairage public, marchés, 000 d’offres étape, sans mairies, etc.) - ANERSOL préqualification) Ouverte, Systèmes de pompage d'eau Internationale (en A 1 000 22 potable par énergie solaire - Tvx Appel une seule étape et Posteriori 100 Janvier 2023 000 d’offres ANERSOL avec préqualification) Acquisition et installation de A Restreinte, 23 systèmes de suivi à distance Four 100 000 Demande Posteriori 100 Mai 2023 Cotations Nationale ANERSOL A Acquisition et installation de Restreinte, Four 100 000 Demande Posteriori 100 Mai 2023 système de suivi à distance Cotations Nationale Ouverte, Assistance technique pour la A Internationale (sur 24 gestion et la pérennisation Cons 300 000 SFQC Posteriori 100 Janvier 2023 la base d’une liste des infrastructures ANERSOL restreinte) Ouverte, Assistance à la maitrise Internationale (sur 1 200 A Priori 100 Juin 2022 25 d'ouvrage et renforcement Cons SFQC la base d’une liste 000 de capacités ANERSOL restreinte) Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Sous Composante 3.2 Communication et Ouverte, A sensibilisation - plan et appui Internationale (sur 29 Cons 250 000 SFQC Posteriori 100 Octobre 2022 à la mise en œuvre – la base d’une liste consultant ANERSOL restreinte) Ouverte, Consultant international A Internationale (sur 32 d'appui à la mise en œuvre Cons 500 000 SFQC Posteriori 100 Avril 2022 la base d’une liste technique ANERSOL restreinte) Sous composante 3.3 Assistance technique pour Ouverte, A l'approche de promotion des Internationale (sur 36 Cons 650 000 SFQC Posteriori 100 Avril 2022 foyers banco et innovation la base d’une liste DPED restreinte) Ouverte, Assistance technique aux A Internationale (sur 39 entreprises y compris Cons 650 000 SFQC Posteriori 100 Juin 2022 la base d’une liste femmes entrepreneurs DPED restreinte) Ouverte, Assistance technique au A Internationale (sur 45 renforcement de capacités Cons 200 000 SFQC Posteriori 100 Octobre 2022 la base d’une liste des distributeurs de LPG restreinte) Assistance technique au Ouverte, A renforcement de capacités Internationale (sur 46 Cons 200 000 SFQC Posteriori 100 Novembre 2022 des distributeurs de LPG la base d’une liste DPED restreinte) Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Ouverte, Assistance technique à la A Internationale (sur 47 participation des femmes à Cons 300 000 SFQC Posteriori 100 Novembre 2022 la base d’une liste la filière LPG DPED restreinte) Ouverte, Etude de la filière LPG, A Internationale (sur 50 organisation, tarification Cons 350 000 SFQC Posteriori 100 Janvier 2023 la base d’une liste DPED restreinte) Service de consultant Ouverte, d'assistance à la mise en 1 700 Internationale (sur A Priori 100 Novembre 2022 51 Cons SFQC œuvre (solutions de 000 la base d’une liste cuissons propres) DPED restreinte) A 53 Consultant national DPED Cons 130 000 SCI Ouverte Posteriori 100 Décembre 2022 A Restreinte, 54 Mobilier pour bureau DPED Four 60 000 Demande Posteriori 100 Mai 2022 de cotation Nationale A Equipements pour contrôle Restreinte, 56 Four 120 000 Appel Posteriori 100 Février 2023 (GPL et Foyers) DPED d’offres Nationale Ouverte, Nationale A Achat de deux véhicules (en une seule 57 Four 120 000 Appel Posteriori 100 Février 2022 DPED d’offres étape, sans préqualification) A Restreinte, 58 Equipement Internet DPED Four 40 000 Demande Posteriori 100 Mai 2022 de cotation Nationale Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Elaboration de la politique Ouverte, A nationale des énergies Internationale (sur 62 Cons 200 000 SFQC Posteriori 100 Septembre 2022 domestiques (une étude) la base d’une liste DPED restreinte) Composante 4 Composante 4.1 NIGELEC Ouverte, Programme de Protection Internationale (en 4 000 Appel A Priori 100 Mars 2022 64 des Recettes (RPP)- Four une seule étape, 000 d’offres Acquisitions NIGELEC sans préqualification) Ouverte, Système d'enregistrement et Internationale (en A 1 500 65 de gestion des incidents Four Appel une seule étape, Posteriori 100 Avril 2022 000 d’offres (IRMS)-Acquisition NIGELEC sans préqualification) Ouverte, Programme de réduction des Internationale (en A 1 500 66 pertes de distribution- Four Appel une seule étape, Posteriori 100 Avril 2022 000 d’offres Acquisition NIGELEC sans préqualification) Ouverte, Numérisation des processus Internationale (en 5 000 Appel A Priori 100 Octobre 2022 67 d'entreprise de la NIGELEC- Four une seule étape, 000 d’offres Acquisition sans préqualification) Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Programme de Ouverte, développement des 1 500 Internationale (sur A Priori 100 Mai 2022 68 ressources humaines de la Cons SFQC 000 la base d’une liste NIGELEC-Consultants (centre restreinte) de formation) Efficacité énergétique pour Ouverte, la réduction de la demande Internationale (en A 1 500 69 de pointe – Acquisition Four Appel une seule étape, Posteriori 100 Juin 2022 000 d’offres sans préqualification) Sous composante 4.2 MPEER Ouverte, Préparation d'un programme A Internationale (sur 70 d'efficacité énergétique – Cons 400 000 SFQC Posteriori 100 Mai 2023 la base d’une liste MPEER restreinte) Ouverte, A Assistance technique au Internationale (sur 78 Cons 500 000 SFQC Posteriori 100 Février 2022 MPEER (Consultants) la base d’une liste restreinte) ARSE A Restreinte, 82 Mobilier de bureau (ARSE) Four 20 000 Demande Posteriori 100 Mai 2022 de cotation Nationale A Restreinte, 83 Matériel Informatique (ARSE) Four 40 000 Demande Posteriori 100 Mai 2022 de cotation Nationale Sous composante 4.3 Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) ANPER Ouverte, Nationale A (en une seule 85 Matériel roulant (ANPER) Four 120 000 Appel Posteriori 100 Mai 2022 d’offres étape et sans préqualification) A Restreinte, 86 Mobilier de bureau (ANPER) Four 20,000 Demande Posteriori 100 Avril 2022 de cotation Nationale A Matériel Informatique Restreinte, 87 Four 40,000 Demande Posteriori 100 Avril 2022 (ANPER) de cotation Nationale Renforcement UGP-ANPER Spécialiste en A 11 développement social et Cons 125 000 SCI Ouverte Posteriori 100 Janvier 2022 1 genre ANPER ANESRSOL Ouverte, Nationale Acquisition Equipements A 11 (en une seule contrôle technique et Four 172 414 Appel Posteriori 100 Janvier 2022 2 d’offres étape, sans logiciels (ANERSOL) préqualification) Acquisition Groupe A 11 Restreinte, électrogène/Centrale solaire Four 70 000 Demande Posteriori 100 Août 2022 3 de cotation Nationale (ANERSOL) Acquisition mobilier de A 11 Ouverte, Nationale bureaux et bureautique Four 160 000 Appel Posteriori 100 Mars 2022 4 d’offres (en une seule (ANERSOL) Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) étape, sans préqualification) A 11 Acquisition matériel Restreinte, Four 40 000 Demande Posteriori 100 Avril 2022 5 informatique (ANERSOL) de cotation Nationale Ouverte, Nationale A 11 Acquisition 2 véhicules (en une seule Four 120 000 Appel Posteriori 100 Mars 2022 6 (ANERSOL) d’offres étape, sans préqualification) Extension et Aménagement A 11 Restreinte, bureaux spécialistes Tvx 100 000 Demande Postériori 100 Juillet 2022 8 de cotation Nationale (ANERSOL) Ouverte, A 12 Internationale (sur Enquête de satisfaction Cons 50 000 SFQC Postériori 100 Janvier 2023 6 la base d’une liste restreinte) RENFORCEMENT UGP ANERSOL Cons Ouverte A 13 Coordonnateur de projets - SCI 225 000 Posteriori 100 Janvier 2022 6 ANERSOL Cons Ouverte A 13 Spécialiste en passation de SCI 125 000 Posteriori 100 Janvier 2022 7 marches - ANERSOL Spécialiste en gestion Cons Ouverte A 13 SCI financière (Comptable) - 125 000 Posteriori 100 Janvier 2022 8 ANERSOL Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Spécialiste en sauvegarde Cons Ouverte A 13 SCI environnementale – 125 000 Posteriori 100 Janvier 2022 9 ANERSOL Cons Ouverte A 14 Spécialiste en sauvegarde SCI 125 000 Posteriori 100 Janvier 2022 0 sociale et genre – ANERSOL Cons Ouverte A 14 SCI Auditeur Interne – ANERSOL 125 000 Posteriori 100 Juin 2022 1 Cons Ouverte A 14 Spécialiste en SCI 125 000 Posteriori 100 Mars 2022 3 communication – ANERSOL Equipement NIGELEC A 14 Restreinte, Mobilier de bureau Four 20 000 Demande Posteriori 100 Avril 2022 5 de cotation Nationale A 14 Restreinte, Matériel Informatique Four 40 000 Demande Posteriori 100 Mai 2022 6 de cotation Nationale Acquisition de la plateforme Ouverte, Nationale A 14 Odyssey pour la préparation (en une seule Four 300 000 Appel Posteriori 100 Avril 2022 7 de nouveaux projets d’offres étape, sans (application informatique) préqualification) Ouverte, Nationale A 14 (en une seule Matériel roulant Four 120 000 Appel Posteriori 100 Février 2022 8 d’offres étape, sans préqualification) Catégor Date de Type de démarrage ie de Méthode % financé Montant Approche de Revue No Libellé du marché passati de par la prévue de US$ marché BM on de sélection Banque l’activité marché (mm/aaaa) Ouverte, A 16 Internationale (sur Audit des comptes du projet Cons 170 000 SFQC Posteriori 100 Aout 2022 9 la base d’une liste restreinte) RENFORCEMENT UGP NIGELEC Spécialiste genre chargé de Cons Ouverte A 17 SCI violence basée sur le genre – 125 000 Posteriori 100 Janvier 2022 4 NIGELEC Cons Ouverte A 17 Spécialiste en suivi SCI 125 000 Posteriori 100 Janvier 2022 5 évaluation – NIGELEC Cons Ouverte A 17 Spécialiste en SCI 125 000 Posteriori 100 Janvier 2022 6 communication - NIGELEC Cons Ouverte A 18 SCI Suivi-Evaluation – Haské 700 000 Posteriori 100 Janvier 2022 0 PROCUREMENT Niger : Niger Accelerating Electricity Access Project (Haské) PLAN General Information Country: Niger 2022-03-07 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174034 GPN Date: 2023-01-25 Project Name: Niger Accelerating Electricity Access Project (Haské) Loan / Credit No: IDA / 70130, IDA / D9460 Agence Nationale d'Energie Solaire Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Component 4. Utility operati NE-ANERSOL-321060-CW-RF onal performance improvem Request for Quota Request for Quota Single Stage - One E 2022-12-1 Q / Aménagement de bureau IDA / 70130 ent, institutional strengtheni Post Limited tions (Non Bank-S 30,000.00 0.00 Signed 2022-10-27 2022-11-11 2022-11-28 tions nvelope 9 x des spécialistes ANERSOL ng, technical assistance and PD) implementa tion support GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4. Utility operati NE-ANERSOL-281277-GO-RF onal performance improvem Request for Quota Single Stage - One E Q / Acquisition Matériel infor IDA / 70130 ent, institutional strengtheni Post Open - National 40,000.00 0.00 Completed 2022-08-06 2022-10-01 2022-10-31 2023-06-07 tions nvelope matique ng, technical assistance and implementa tion support Component 3. Increasing ac cess to solar off-grid electrici NE-ANERSOL-321064-GO-RF ty service for public instituti Request for Quota Single Stage - One E Q / Acquisition de matériels i IDA / 70130 Post Limited 35,000.00 0.00 Completed 2022-10-29 2022-12-19 2022-12-24 2023-02-20 2023-05-19 ons, households and product tions nvelope nformatiques pour la DPEC ive us es of energy and clea n and efficient cooking soluti ons Component 4. Utility operati NE-ANERSOL-323354-GO-RF onal performance improvem B / Acquisition Mobilier de bu Single Stage - One E IDA / 70130 ent, institutional strengtheni Post Request for Bids Open - National 160,000.00 0.00 Canceled 2022-11-07 2022-11-12 2022-12-24 2023-01-23 2023-02-27 2023-03-31 reau et bureautique ANERSO nvelope ng, technical assistance and L implementa tion support Component 4. Utility operati NE-ANERSOL-281276-GO-RF onal performance improvem Request for Quota Single Stage - One E Q / Acquisition Mobilier de bu IDA / 70130 ent, institutional strengtheni Post Limited 80,000.00 0.00 Canceled 2022-08-06 2022-10-01 2023-03-30 tions nvelope reau ng, technical assistance and implementa tion support NE-ANERSOL-348084-GO-RF Component 4. Utility operati Q / Acquisition de mobiliers e onal performance improvem Request for Quota Single Stage - One E t équipements de bureau po IDA / 70130 ent, institutional strengtheni Post Limited 65,000.00 0.00 Signed 2023-03-15 2023-03-15 2023-03-30 2023-04-14 tions nvelope ur les bureaux réaménagés d ng, technical assistance and e l'ANERSOL implementa tion support Component 3. Increasing ac NE-ANERSOL-358629-GO-RF cess to solar off-grid electrici B / Acquisition de quatre (04) ty service for public instituti Single Stage - One E Under Imple IDA / D9460 Post Request for Bids Open - National 240,000.00 0.00 2023-04-28 2023-05-15 2023-05-03 2023-06-02 2023-06-17 2023-07-15 2023-10-13 véhicules pour l’ANERSOL et ons, households and product nvelope mentation la DPEC ive us es of energy and clea n and efficient cooking soluti ons NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NE-ANERSOL-281283-CS-QC Component 4. Utility operati BS / Recrutement d'un consul onal performance improvem Quality And Cost- Open - Internationa tant en assistance pour la mi IDA / 70130 ent, institutional strengtheni Prior 1,700,000.00 0.00 Canceled 2022-03-14 2023-03-02 2022-04-04 2023-04-07 2022-05-18 2022-06-15 2022-07-15 2022-08-19 2022-09-23 2023-09-18 Based Selection l se en œuvre pour la cuisson ng, technical assistance and propre implementa tion support NE-ANERSOL-328592-CS-QC BS / Recrutement d'un Gestio Component 3. Increasing ac nnaire de Fonds chargé de l’ cess to solar off-grid electrici Elaboration du Manuel d’Opé ty service for public instituti Quality And Cost- Open - Internationa ration de Financement Basé IDA / 70130 ons, households and product Prior 1,700,000.00 0.00 Under Review 2022-12-05 2022-12-13 2022-12-26 2022-12-17 2023-02-08 2023-03-01 2023-03-08 2023-05-04 2023-04-07 2023-05-12 2023-06-16 2024-06-15 Based Selection l sur les Résultats (FBR) et de l ive us es of energy and clea a Gestion du Fonds de Subve n and efficient cooking soluti ntion dans le cadre de la mis ons e en œuvre de la composant e 3 du Projet HASKE (Relance ) Component 3. Increasing ac NE-ANERSOL-281278-CS-QC cess to solar off-grid electrici BS / Recrutement d'un gestio ty service for public instituti Quality And Cost- Open - Internationa IDA / 70130 Prior 1,700,000.00 0.00 Canceled 2022-07-25 2022-08-05 2022-08-27 2022-08-24 2022-10-10 2022-11-07 2022-12-07 2023-01-11 2023-02-15 2029-01-14 nnaire des fonds - produits s ons, households and product Based Selection l olaires et foyers ive us es of energy and clea n and efficient cooking soluti ons Component 3. Increasing ac NE-ANERSOL-323356-CS-QC cess to solar off-grid electrici BS / Recrutement d'un consul ty service for public instituti Quality And Cost- Open - Internationa tant d'assistance technique p IDA / 70130 Prior 1,700,000.00 0.00 Under Review 2022-12-16 2022-12-20 2023-01-06 2022-12-21 2023-02-19 2023-03-08 2023-03-19 2023-05-02 2023-04-18 2023-05-23 2023-06-27 2024-06-26 ons, households and product Based Selection l our la mise en œuvre de l'éle ive us es of energy and clea ctrification hors réseau n and efficient cooking soluti ons Page 1 NE-ANERSOL-361959-CS-CQ S / Recrutement d'un cabinet Component 4. Utility operati chargé de la réalisation des é onal performance improvem Consultant Qualifi Under Implement tudes architecturales, techni IDA / D9460 ent, institutional strengtheni Post Limited 7,000.57 0.00 2023-05-29 2023-05-30 2023-06-12 2023-06-19 2023-07-04 2023-12-31 cation Selection ation ques (APS, APD, EES, DAO) et ng, technical assistance and le suivi et contrôle des trava implementa tion support ux d'extension des bureaux ( ANERSOL) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 4. Utility operati NE-ANERSOL-365593-CS-CD onal performance improvem Direct - Internation Under Implement S / Appui-Conseil a la sous-C IDA / 70130 ent, institutional strengtheni Post Direct Selection 950,000.00 0.00 2023-06-13 2023-06-16 2023-06-23 2023-07-30 2026-07-29 al ation omposante Cuisson Propre ng, technical assistance and implementa tion support Page 2 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [Original: December 2007]: Revision 15 of Updated Procurement Plan, June 2010] 2. Date of General Procurement Notice: Dec 24, 2006 3. Period covered by this procurement plan: The procurement period of project covered from year June 2010 to December 2012 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 100,000 First contract 3. ICB (Works) Above US$ 15 million All 4. NCB (Works) Above US$ 5 million All 5. (Non-Consultant Services) Below US$ 100,000 First contract [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. July 9, 2010 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project XYZ 04/01/2010 issued by 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] 5 ICB works packages will be financed under retroactive financing 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary 82 5 No Prior of the ICB (Works) Summary 43.77 15 No Prior of the ICB (Goods) Summary 64.53 18 No Post 1st of the NCB contrac (Works) t for Prior Review Summary 1.86 4 No Post 1st of the NCB contrac (Goods) t for Prior Review Summary 0.45 1 No Prior of the ICB (Non- Consultant Services) July 9, 2010 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 4.17 7 Prior of number of contracts that will be let under QCBS Summary 0.83 1 Prior CQS of number of contracts that will be let under other July 9, 2010 methods July 9, 2010 PROCUREMENT Kenya : Kenya Youth Employment and Opportunities PLAN General Information Country: Kenya 2017-02-21 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P151831 GPN Date: 2017-04-03 Project Name: Kenya Youth Employment and Opportunities Loan / Credit No: IDA / 58120  Ministry of East African Community Labour and Social Protection Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MEACLSS-7399-GO-RFB / Purchase of computers, lapto ps , printers , tablets and ser vers. These equipment is me Improving labor market infor Single Stage - One E ant to increase the capacity IDA / 58120 Post Request for Bids Open - National 160,000.00 60,615.59 Signed 2017-05-31 2017-10-03 2017-06-09 2017-06-30 2017-11-07 2017-07-14 2017-12-13 2017-07-28 2018-04-06 2017-08-27 mation nvelope of the unit to process the dat a it collects, collate and anal yzes, especially as it contribu tes to the achievement of th e Project Objective KE-MEACLSS-7398-GO-RFB / Purchase of a four wheel dri ve vehicle and a van for use by the program Implementin Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Open - National 100,000.00 46,640.33 Completed 2017-06-19 2020-06-02 2017-07-27 2020-06-30 2017-08-31 2020-08-19 g Office at headquarters. The mation tions nvelope se vehicles will enhance mob ility of the PIU staff during da ta collection, and other outre ach activities pertaining to th e Project. KE-MEACLSS-14229-GO-RFQ / Purchase of computer desk s and chairs for the refurbish ed LMIS unit at the Ministry o Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 50,000.00 12,832.55 Completed 2017-06-05 2017-12-21 2017-07-06 2018-02-01 2017-07-21 2018-02-10 f East Africa Community, Lab mation tions nvelope our and Social Protection - St ate Department for Labour to ensure it is fully furnished an d operational KE-MEACLSS-7401-GO-RFQ / Procurement of software pac Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 25,000.00 0.00 Canceled 2017-06-09 2017-07-09 2017-07-23 kages SPSS, Antivirus, Micro mation tions nvelope soft office and latest window version KE-MEACLSS-43431-GO-RFQ / Purchase of 360 portable po wer bank units erroneously o Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 23,000.00 36,014.58 Completed 2018-01-27 2018-09-26 2018-03-24 2018-10-22 2018-09-20 2019-03-11 mitted while procuring Tablet mation tions nvelope s for conducting the informal sector skills and occupation s ector survey KE-MEACLSS-60175-GO-DIR / The Ministry intends to proc ure a cloud server from Dobil ity which will be used for Dat Improving labor market infor IDA / 58120 Post Direct Selection Direct 60,000.00 0.00 Canceled 2018-05-18 2018-06-06 2018-06-25 2019-06-24 a Management in the upcomi mation ng informal sector survey tha t has been designed to use C omputer Application Personal Interview (CAPI). KE-MEACLSS-69009-GO-RFQ / The Ministry intends to proc Improving labor market infor Request for Quota Single Stage - One E Pending Impl ure 140 pieces of tablets for IDA / 58120 Post Limited 37,800.00 0.00 2018-08-18 2018-09-10 2018-09-17 mation tions nvelope ementation use in data collection for the Informal Sector Skills & Occu pations Survey KE-MEACLSS-145070-GO-RF Q / The State Department int ends to procure a multi-func Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 8,000.00 6,189.07 Signed 2020-04-03 2020-06-02 2020-05-29 2020-06-24 2020-11-25 tional photocopier to enhanc mation tions nvelope e the PIU team operations a nd the newly established Lab our Market Observatory Unit KE-MEACLSS-165726-GO-RF Q / The State Department for Improving labor market infor Request for Quota Single Stage - One E Labour intends to procure 2 IDA / 58120 Post Limited 3,300.00 3,229.92 Completed 2020-04-04 2020-05-22 2020-05-30 2020-06-17 2020-11-26 2020-06-19 mation tions nvelope No. 4 drawer fireproof cabine t @$1650.00 each to ensure safe keeping of documents KE-MEACLSS-165711-GO-RF Q / The State Department ne Improving labor market infor Request for Quota Single Stage - One E Under Imple eds to procure two LCD Proje IDA / 58120 Post Limited 2,100.00 0.00 2020-04-03 2020-06-02 2020-05-29 2020-11-25 mation tions nvelope mentation ctor, Electric Screen and mou nters @$1050/= each KE-MEACLSS-165720-GO-RF Q / Procurement of 3No. MD Bootstrap Angular software Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 900.00 3,112.04 Signed 2020-04-03 2020-05-22 2020-05-29 2020-06-17 2020-11-25 @ $300.00 each to be used i mation tions nvelope n the presentation of data for the Kenya Labour Market Info rmation System (KLMIS) KE-MEACLSS-165731-GO-RF Q / Procurement of 7No. of e Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 3,150.00 2,880.41 Completed 2020-04-03 2020-05-22 2020-05-29 2020-06-17 2020-11-25 2020-06-20 xecutive chairs for the PIU m mation tions nvelope embers @$450.00 each Page 1 KE-MEACLSS-165733-GO-RF Q / Procurement of 2No. exec Improving labor market infor Request for Quota Single Stage - One E Under Imple utive book shelves @ $600.0 IDA / 58120 Post Limited 1,200.00 0.00 2020-04-03 2020-05-22 2020-05-29 2020-11-25 mation tions nvelope mentation 0 for the Director of the depa rtment and the Project Coord inator's offices KE-MEACLSS-165735-GO-RF Q / Procurement of 5 No. offi Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 2,750.00 5,859.41 Completed 2020-04-03 2020-05-22 2020-05-29 2020-06-17 2020-11-25 2020-06-19 ce desks with side tables for mation tions nvelope members of the PIU KE-MEACLSS-162540-NC-RF Q / The State Department for Labour intends to procure vis Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 2,160.00 2,213.28 Signed 2020-05-15 2020-05-22 2020-07-10 2020-06-17 2021-01-06 ualization tools (3No. Fusion mation tions nvelope charts) @ $720 each to be us ed for the presentation of the KLMIS data KE-MEACLSS-165721-GO-RF Q / Procurement of 3 No. hig h charts software @ $950 ea Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 2,850.00 2,956.30 Completed 2020-05-22 2020-05-22 2020-07-17 2020-06-17 2021-01-13 2020-06-17 ch to be used in the presenta mation tions nvelope tion of data for the Kenya La bour Market Information Syst em (KLMIS) KE-MEACLSS-165728-GO-RF Q / Procurement of 30 -seate Improving labor market infor Request for Quota Single Stage - One E r executive conference table IDA / 58120 Post Limited 1,500.00 0.00 Canceled 2020-05-22 2020-05-22 2020-07-17 2021-01-13 mation tions nvelope with charging units for the co nference room located on 15 th floor NSSF building block B KE-MEACLSS-165730-GO-RF Q / Procurement of 42No. of high back mesh conference s Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 12,600.00 17,716.86 Completed 2020-05-22 2020-05-22 2020-07-17 2020-06-17 2021-01-13 2020-06-19 eats for the main conference mation tions nvelope room as well as the proposed conference table at the Proje ct Coordinator's office KE-MEACLSS-165734-GO-RF Q / Procurement of 2 sets of Improving labor market infor Request for Quota Single Stage - One E 5 seater leather sofas for the IDA / 58120 Post Limited 1,800.00 2,549.94 Completed 2020-05-20 2020-05-22 2020-07-15 2020-06-17 2021-01-11 2020-06-19 mation tions nvelope Director's office and the Proj ect Coordinator's office @ $1 800.00 each KE-MEACLSS-165725-GO-RF Q / Procurement of 3No. tabl Improving labor market infor Request for Quota Single Stage - One E eau creators software @$100 IDA / 58120 Post Limited 3,000.00 971.31 Completed 2020-05-22 2020-05-22 2020-07-17 2020-06-17 2021-01-13 2020-06-19 mation tions nvelope 0.00 each to be used in pres entation of data for the KLMI S KE-MEACLSS-165729-GO-RF Q / Procurement of one 12-se Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 900.00 1,492.54 Signed 2020-05-22 2020-05-22 2020-07-17 2020-06-17 2021-01-13 ater conference table for the mation tions nvelope Project Coordinator's office KE-MEACLSS-171907-GO-RF Q / The State Department int ends to procure a multi-funct ional photocopier which will b Improving labor market infor Request for Quota Single Stage - One E e networked to enhance the IDA / 58120 Post Limited 8,000.00 6,189.07 Signed 2020-05-22 2020-06-02 2020-07-17 2020-06-24 2021-01-13 mation tions nvelope operations of the unit in print ing/scanning and photocopyi ng volumes of work as sugg ested by the Bank instead of procuring scanners and print ers KE-MEACLSS-173926-GO-RF Q / The State Department for Labour intends to procure 3N Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 12,000.00 0.00 Canceled 2020-07-03 2020-08-28 2021-08-28 O. virtual Cloud Servers (VPS mation tions nvelope ) for system hosting, for web crawlers and back up for the KLMIS KE-MEACLSS-213842-GO-RF Q / The State Department int Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 2,780.00 4,788.38 Signed 2021-01-29 2021-04-29 2021-03-26 2021-05-25 2021-04-25 ends to procure 2No. laptops mation tions nvelope for the PIU team to enhance t heir operations. KE-MEACLSS-227469-GO-RF Q / Supply and delivery of 1N Improving labor market infor Request for Quota Single Stage - One E o. laptop computer for the Di IDA / 58120 Post Limited 1,500.00 2,394.19 Signed 2021-04-12 2021-04-29 2021-06-07 2021-05-25 2021-07-07 mation tions nvelope rector - National Human Reso urce Planning and Developm ent KE-MEACLSS-260138-GO-RF B / The Ministry of Labour wo Improving labor market infor Single Stage - One E uld like to procure 3No. 4x4 IDA / 58120 Post Request for Bids Open - National 360,000.00 257,180.26 Signed 2022-01-17 2022-02-22 2022-01-22 2022-03-03 2022-03-05 2022-03-31 2022-04-04 2022-04-17 2022-05-09 2022-06-10 2022-11-05 mation nvelope Heavy duty passenger utility vehicles for KYEOP-LMIS. KE-MEACLSS-260142-GO-RF Q / The ministry of Labour wo Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 12,000.00 16,458.37 Completed 2021-11-07 2022-03-14 2022-01-02 2022-05-18 2022-01-31 2022-06-01 uld like to procure 6No. i7 lap mation tions nvelope tops (Hp Spectre x360) KE-MEACLSS-279978-GO-RF B / The Ministry of Labour int ends to purchase one (1) 9- p Improving labor market infor Single Stage - One E IDA / 58120 Post Request for Bids Open - National 54,000.00 46,878.16 Signed 2022-02-22 2022-03-08 2022-02-27 2022-05-24 2022-03-29 2022-04-07 2022-04-12 2022-04-16 2022-05-10 2022-06-10 2022-06-27 assenger seater van to enha mation nvelope nce mobility of the PIU staff d uring data collection and oth er outreach programs. KE-MEACLSS-282330-GO-RF Q / Supply, installation and c ommissioning of 10(No.) CCT V cameras to enhance securi Improving labor market infor Request for Quota Single Stage - One E IDA / 58120 Post Limited 10,000.00 8,625.10 Signed 2022-04-08 2022-06-03 2022-05-14 2022-06-21 2022-06-13 ty on the 14th and 15th floor mation tions nvelope s of NSSF Building Block B to enhance security for the data center and the offices which has been a concern for some time. Page 2 KE-MEACLSS-286789-GO-RF Q / The Ministry intends to pr ocure 5(no.) 48 ports access switches owing to the freque Improving labor market infor Request for Quota Single Stage - One E nt power surges caused by d IDA / 58120 Post Limited 7,500.00 20,659.76 Signed 2022-04-04 2022-06-03 2022-05-07 2022-06-21 2022-05-10 mation tions nvelope amaged power supply leadin g to network downtime and c utting off users from internet connectivity that's crucial for business operations KE-MEACLSS-286790-GO-RF Q / The Ministry intends to pr ocure 4 (No.) 2.0KVA rack mo Improving labor market infor Request for Quota Single Stage - One E untable UPS to enhance prot IDA / 58120 Post Limited 2,800.00 9,851.51 Signed 2022-04-04 2022-06-03 2022-05-07 2022-06-21 2022-06-06 mation tions nvelope ection against power surges based on the recommendatio ns of the ICT networking tea m to replace the existing one s. KE-MEACLSS-325532-GO-RF Q / The State Department int ends to procure 20 units of 1 Improving labor market infor Request for Quota Single Stage - One E Pending Impl KVA line interactive UPS for t IDA / 58120 Post Limited 13,450.00 0.00 2022-12-07 2023-01-11 2023-02-08 mation tions nvelope ementation he computers located at the data center, NSSF building Bl ock B, 14th floor to protect a gainst power surges. KE-MEACLSS-325537-GO-RF Q / The State Department int Improving labor market infor Request for Quota Single Stage - One E Pending Impl ends to procure 15-user STA IDA / 58120 Post Limited 8,300.00 0.00 2022-11-30 2022-12-21 2023-01-18 mation tions nvelope ementation TA/MP 17 (4 core) for analyzi ng and presenting data colle cted from ESOS. KE-MEACLSS-335936-GO-RF Q / The Ministry intends to pr ocure two (2No.) interactive screens (smart boards) to all Improving labor market infor Request for Quota Single Stage - One E Under Imple IDA / 58120 Post Limited 17,750.00 0.00 2023-01-28 2023-02-17 2023-03-04 2023-04-03 ow incorporation of the techn mation tions nvelope mentation ology in meetings and make i t easier for everyone to unde rstand the content being pre sented especially in LMO me eting set ups. KE-MEACLSS-361999-GO-RF Q / The State Department int ends to procure 50No. deskto Improving labor market infor Request for Quota Single Stage - One E Pending Impl IDA / 58120 Post Limited 75,000.00 0.00 2023-05-28 2023-06-15 2023-06-30 p computers to replace the o mation tions nvelope ementation nes in the Date Centre and t he ones being used by officer s within the department KE-MEACLSS-362002-GO-RF Q / The State department wo uld like to procure 8No. lapto ps for the National Human Re Improving labor market infor Request for Quota Single Stage - One E Pending Impl IDA / 58120 Post Limited 24,000.00 0.00 2023-05-28 2023-06-17 2023-07-02 source Planning and Develop mation tions nvelope ementation ment department which will go a long way in assisting th e development and data adm inistration of the KLMIS KE-MEACLSS-362007-GO-RF Q / The State Department int Improving labor market infor Request for Quota Single Stage - One E Pending Impl ends to procure 2No. Multifu IDA / 58120 Post Limited 18,200.00 0.00 2023-05-28 2023-06-15 2023-06-30 mation tions nvelope ementation nctional copiers and 4No. Las erJet printers for the NHRPD department KE-MEACLSS-362008-GO-RF Q / The State Department int ends to procure 2No. project Improving labor market infor Request for Quota Single Stage - One E Pending Impl IDA / 58120 Post Limited 3,000.00 0.00 2023-05-28 2023-06-11 2023-07-01 ors for use within the depart mation tions nvelope ementation ment of National Human Res ource Planning and Develop ment NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MEACLSS-145080-NC-RF Q / The State Department int Improving labor market infor Request for Quota Single Stage - One E ends to procure electronic an IDA / 58120 Post Limited 4,000.00 0.00 Canceled 2020-04-10 2020-06-05 2020-12-02 mation tions nvelope d print media services in diss emination of Labour Market I nformation (LMI) KE-MEACLSS-145078-NC-RF Q / The State Department for Improving labor market infor Request for Quota Single Stage - One E Labour intends to procure pri IDA / 58120 Post Limited 1,000.00 0.00 Canceled 2020-04-10 2020-06-05 2020-12-02 mation tions nvelope nting services and productio n of IEC materials for the Co mmunication Strategy CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MEACLSS-7407-CS-QCBS / Development of MIS for LMI Improving labor market infor Quality And Cost- Open - Internationa IDA / 58120 Prior 500,000.00 0.00 Canceled 2017-03-14 2017-04-04 2017-04-25 2017-06-06 2017-06-27 2017-07-11 2017-08-01 2018-08-01 in the Ministry of East African mation Based Selection l Community, Labour and Soci al Protection INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-MEACLSS-7405-CS-INDV / Individual consultant-Engage Improving labor market infor Individual Consult IDA / 58120 Post Limited 44,000.00 0.00 Canceled 2017-02-27 2017-03-13 2017-03-27 2017-04-10 2017-10-09 a Technical Advisor to guide i mation ant Selection n the overall development of LMI content Page 3 KE-MEACLSS-15591-CS-INDV / Development of communica tion strategy for the LMIS in t Improving labor market infor Individual Consult Under Implement IDA / 58120 Post Open 36,000.00 0.00 2017-07-31 2018-02-16 2017-09-02 2018-05-28 2017-09-18 2018-06-14 2017-10-02 2018-10-01 he Ministry of East African Co mation ant Selection ation mmunity, labor and social Pr otection -State Department f or Labor KE-MEACLSS-60176-CS-INDV / The Ministry intends to eng age an International Technic al Adviser on Labour Market I Improving labor market infor Individual Consult nformation Systems(LMIS) to IDA / 58120 Post Open 44,000.00 0.00 Canceled 2018-04-23 2018-04-10 2018-05-21 2018-05-23 2018-05-28 2018-08-28 mation ant Selection support the enhancement of the Kenya LMIS by developin g a detailed framework to en sure it's sustainability among other objectives KE-MEACLSS-62530-CS-INDV / The Ministry intends to eng age an Individual Consultant to develop web based applic Improving labor market infor Individual Consult ations to enable sharing of a IDA / 58120 Post Open 45,000.00 29,045.66 Signed 2018-05-17 2018-08-02 2018-06-12 2018-10-15 2018-06-18 2018-12-10 2018-06-26 2019-01-01 2018-09-24 mation ant Selection dministrative data among de partments and integrate the application onto existing KLM IS portal to ensure provision of real time data for KLMIS KE-MEACLSS-72551-CS-INDV / The Ministry intends to eng age an International Technic al Adviser on Labour Market I Improving labor market infor Individual Consult nformation to support the en IDA / 58120 Post Open 90,000.00 90,000.00 Signed 2018-08-02 2018-04-25 2018-08-23 2018-06-13 2018-08-27 2018-08-12 2018-09-03 2018-08-29 2018-12-14 mation ant Selection hancement of the Kenya Lab our Market Information Syste m by developing a detailed fr amework to ensure it's sustai nability among other objectiv es KE-MEACLSS-43424-CS-INDV / The Ministry intends to eng age a Consultant Specialist w hose role will be to assess th Improving labor market infor Individual Consult e needs of KLMIS users in rel IDA / 58120 Post Open 60,000.00 0.00 Canceled 2020-04-12 2020-05-31 2020-06-21 2020-07-26 2021-01-22 mation ant Selection ation to the current and proje cted architecture and conten t for improvement and devel opment of APIs to facilitate in formation sharing KE-MEACLSS-145066-CS-CD S / The MInistry intends to pr ocure an individual consultan Improving labor market infor t to support the development IDA / 58120 Post Direct Selection Direct 90,000.00 90,000.00 Signed 2020-03-29 2020-07-06 2020-04-08 2020-12-16 2020-06-12 2021-05-11 2020-12-09 mation of Labour Market Observator y expected to take between 60 - 90 days over a period of one year KE-MEACLSS-145074-NC-RF Q / The State Department for Labour intends to procure a c Improving labor market infor Individual Consult IDA / 58120 Post Open 4,000.00 0.00 Canceled 2020-03-29 2020-06-22 2020-05-17 2020-06-07 2020-07-12 2021-01-08 onsultant to design infograph mation ant Selection ics for the Kenya Labour Mar ket Information System (KLMI S) KE-MEACLSS-270462-CS-IND V / The Ministry of Labour int ends to engage a consultant Improving labor market infor Individual Consult Under Implement IDA / 58120 Post Open 10,000.00 0.00 2021-12-22 2022-03-31 2022-02-15 2022-03-08 2022-04-12 2022-10-09 who will develop a web base mation ant Selection ation d interactive system for the Kenya Standard of Industrial Classification (KeSIC). KE-MEACLSS-358792-CS-IND V / The State Department int ends to procure ICT consulta Improving labor market infor Individual Consult Under Implement IDA / 58120 Post Open - National 10,000.00 0.00 2023-05-02 2023-05-05 2023-06-06 2023-06-13 2023-07-04 2023-12-31 ncy services for the enhance mation ant Selection ation ment of KLMIS to accommod ate the Kenya Standard Clas sification of Occupations (Ke SCO) KE-MEACLSS-359490-CS-IND V / The State Department for Labour intends to procure an Improving labor market infor Individual Consult Under Implement IDA / 58120 Post Open - National 20,000.00 0.00 2023-05-03 2023-05-10 2023-05-29 2023-06-23 2023-06-27 2023-07-26 individual consultant to devel mation ant Selection ation op a framework on key empl oyability skills to enhance lab our market outcomes Page 4 PROCUREMENT PLAN (Textual Part) Project information: P168120 – Romania Emergency Preparedness Project Project Implementation agency: General Inspectorate of the Romanian Gendarmerie Date of the Procurement Plan: September 8, 2020 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. As part of project preparations and negotiations, it has been agreed that the Bank’s Standard Procurement Documents or other documents agreed with the Bank will be used for procurement with national market approach. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable PROCUREMENT Romania : Strengthening Preparedness and Critical Emergency Infrastructure Project PLAN General Information Country: Romania 2020-09-10 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168120 GPN Date: 2020-09-30 Project Name: Strengthening Preparedness and Critical Emergency Infrastructure Project Loan / Credit No: IBRD / 89500 General Inspectorate of the Romanian Gendarmerie Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure RO-GIRG-350428-CW-RFB / Enhance the Resilience of Se ment Document - Retrofitting & modernizing w lected Romanian Gendarmer Single Stage - One E Under Imple 2024-12-1 IBRD / 89500 Post Request for Bids Open - National 1 Envelope proce 855,000.00 0.00 2023-03-21 2023-03-27 2023-03-23 2023-05-04 2023-05-08 2023-06-03 2023-05-31 2023-06-27 orks for OCHIURI Training Ce ie Infrastructure to be used i nvelope mentation 8 ss (Non Bank-SPD ntre, building 45-254-03 n Disaster Response ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RO-GIRG-192411-GO-RFQ / Request for Quota Single Stage - One E IBRD / 89500 Project Management Post Open - National 10,000.00 0.00 Canceled 2022-12-05 2023-01-30 2023-09-01 Audio-video Equipment tions nvelope RO-GIRG-199611-GO-RFQ / Request for Quota Single Stage - One E IBRD / 89500 Project Management Post Open - National 3,500.00 0.00 Canceled 2022-12-05 2022-12-29 2023-07-02 Multifunction Machine tions nvelope RO-GIRG-199579-GO-RFQ / I Request for Quota Single Stage - One E T and Audio-Video equipmen IBRD / 89500 Project Management Post Open - National 3,500.00 0.00 Canceled 2022-12-05 2022-12-29 2023-07-02 tions nvelope t for PIU Staff (first goods pro curement) RO-GIRG-192412-GO-RFQ / Request for Quota Single Stage - One E IBRD / 89500 Project Management Post Open - National 35,000.00 0.00 Canceled 2022-12-05 2023-01-30 2023-07-02 Cars tions nvelope RO-GIRG-192410-GO-RFQ / I Request for Quota Single Stage - One E IBRD / 89500 Project Management Post Open - National 72,000.00 0.00 Canceled 2022-12-05 2023-01-30 2023-07-02 T Equipment for PIU Staff tions nvelope RO-GIRG-324849-GO-RFB / A Operational Readiness and P Open - Internationa Single Stage - One E IBRD / 89500 Prior Request for Bids 2,750,000.00 0.00 Signed 2022-11-21 2022-11-22 2022-12-01 2022-11-28 2023-01-19 2023-01-27 2023-03-05 2023-03-31 2023-03-29 2023-05-26 2024-02-22 utovehicle for operational wo ublic Awareness l nvelope rk RO-GIRG-324853-GO-RFB / I Operational Readiness and P Single Stage - One E IBRD / 89500 Post Request for Bids Open - National 670,000.00 0.00 Signed 2022-12-11 2022-12-15 2022-12-16 2023-01-27 2023-01-26 2023-02-26 2023-03-16 2023-03-22 2023-07-20 T&C equipment for operation ublic Awareness nvelope al centers RO-GIRG-324859-GO-RFQ / I Request for Quota Single Stage - One E IBRD / 89500 Project Management Post Open - National 36,000.00 0.00 Signed 2022-11-25 2023-01-27 2023-03-28 T&C equipment for PIU tions nvelope RO-GIRG-324862-GO-RFQ / Request for Quota Single Stage - One E IBRD / 89500 Project Management Post Open - National 12,500.00 0.00 Signed 2022-12-10 2023-02-11 2023-04-12 Office furniture for PIU tions nvelope NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RO-GIRG-192413-CS-CQS / T Enhance the Resilience of Se echnical design and technical lected Romanian Gendarmer Consultant Qualifi IBRD / 89500 Post Open - National 31,000.00 0.00 Signed 2021-07-31 2022-08-18 2021-08-21 2021-10-04 2022-11-29 2021-11-03 2022-12-13 2021-12-08 2025-12-31 assistance for Gendarme Ins ie Infrastructure to be used i cation Selection pectorate of Olt County n Disaster Response RO-GIRG-287427-CS-CQS / T echnical surveys for batch II ( Enhance the Resilience of Se Training Centre for the Impro lected Romanian Gendarmer Consultant Qualifi vement of Gendarme Staff O IBRD / 89500 Post Open - National 6,100.00 0.00 Canceled 2022-05-01 2022-04-29 2022-05-22 2022-07-05 2022-07-26 2022-08-04 2022-09-13 2022-09-08 2025-12-31 ie Infrastructure to be used i cation Selection chiuri - Housing spaces & Tr n Disaster Response aining Centre for the Improve ment of Gendarme Staff Ochi uri - Operational headquarter s) RO-GIRG-192416-CS-CQS / T Enhance the Resilience of Se echnical design and technical lected Romanian Gendarmer Consultant Qualifi assistance services for Traini IBRD / 89500 Post Open - National 10,000.00 0.00 Signed 2022-05-01 2022-04-13 2022-05-22 2022-04-20 2022-07-05 2022-07-14 2022-08-04 2022-09-13 2022-09-08 2025-12-31 ie Infrastructure to be used i cation Selection ng Centre for the Improveme n Disaster Response nt of Gendarme Staff Ochiuri (Housing spaces) RO-GIRG-287442-CS-CQS / T Enhance the Resilience of Se echnical design and technical lected Romanian Gendarmer Consultant Qualifi Under Implement assistance services for Gend IBRD / 89500 Post Open - National 65,000.00 0.00 2022-05-01 2022-08-18 2022-05-22 2022-07-05 2022-08-04 2022-09-08 2025-12-31 ie Infrastructure to be used i cation Selection ation arme Inspectorate of Hunedo n Disaster Response ara County (Operational hea dquarters) RO-GIRG-288430-CS-CQS / T Enhance the Resilience of Se ehnical verifiers for Training lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 2,400.00 0.00 2022-05-15 2022-09-23 2022-06-05 2022-07-19 2022-08-18 2022-09-22 2025-12-31 Centre for the Improvement ie Infrastructure to be used i cation Selection ation of Gendarme Staff Ochiuri - H n Disaster Response ousing spaces RO-GIRG-288433-CS-CQS / T echnical surveys for batch II ( Enhance the Resilience of Se Warrant Officers Gendarmes lected Romanian Gendarmer Consultant Qualifi School Fălticeni - Education h IBRD / 89500 Post Open - National 15,000.00 0.00 Signed 2022-05-01 2022-04-29 2022-05-22 2022-07-05 2022-07-26 2022-08-04 2022-09-13 2022-09-08 2025-12-31 ie Infrastructure to be used i cation Selection eadquarters) and batch III (W n Disaster Response arrant Officers Gendarmes Sc hool Fălticeni - Operational h eadquarters) Page 1 RO-GIRG-288431-CS-CQS / T Enhance the Resilience of Se echnical surveys for batch II ( lected Romanian Gendarmer Consultant Qualifi Warrant Officers Gendarms S IBRD / 89500 Post Open - National 18,000.00 0.00 Signed 2022-05-01 2022-04-29 2022-05-22 2022-07-05 2022-07-26 2022-08-04 2022-09-13 2022-09-08 2025-12-31 ie Infrastructure to be used i cation Selection chool Dragasani and Gendar n Disaster Response me Inspectorate of Teleorma n Conuty, Turnu Magurele) RO-GIRG-289860-CS-CQS / T Enhance the Resilience of Se echnical design and technical lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 22,000.00 0.00 2022-04-24 2022-11-09 2022-05-15 2022-06-28 2022-07-28 2022-09-01 2025-12-31 assistance for Gendarme Ins ie Infrastructure to be used i cation Selection ation pectorate of Botosani County n Disaster Response Enhance the Resilience of Se RO-GIRG-291492-CS-CQS / T lected Romanian Gendarmer Consultant Qualifi IBRD / 89500 Post Open - National 20,000.00 0.00 Signed 2022-05-08 2022-04-29 2022-05-29 2022-07-12 2022-08-08 2022-08-11 2022-09-13 2022-09-15 2025-12-31 echnical surveys for batch III ie Infrastructure to be used i cation Selection n Disaster Response RO-GIRG-293128-CS-CQS / T Enhance the Resilience of Se echnical survey for Gendarm lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 8,000.00 0.00 2022-05-19 2022-09-29 2022-06-09 2022-07-23 2022-12-07 2022-08-22 2022-12-27 2022-09-26 2023-03-25 erie Inspectorate of Mehedint ie Infrastructure to be used i cation Selection ation i County n Disaster Response RO-GIRG-307716-CS-CQS / P atch 6 - Technical surveys 6 Operational Readiness and P Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 63,000.00 0.00 2022-09-30 2022-09-30 2022-10-21 2022-12-04 2022-12-07 2023-01-03 2022-12-27 2023-02-07 2023-05-08 constructions from Batch IV ( ublic Awareness cation Selection ation DGJMB, GJMB BV, IJJ BZ, IJJ B V, IJJ HD, IJJ TR) RO-GIRG-287465-CS-CQS / T ehnical verifiers (Gendarme I nspectorate of Olt County - O Enhance the Resilience of Se perational headquarters, Gen lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 8,300.00 0.00 2022-10-07 2023-02-27 2022-10-28 2022-12-11 2023-01-10 2023-02-14 2026-05-25 darme Inspectorate of Huned ie Infrastructure to be used i cation Selection ation oara County - Operational he n Disaster Response adquarters and (Gendarme I nspectorate of Botosani Coun ty - Operational headquarter s) RO-GIRG-343834-CS-CQS / T echnical surveys for batch II ( Enhance the Resilience of Se Training Centre for the Impro lected Romanian Gendarmer Consultant Qualifi vement of Gendarme Staff O IBRD / 89500 Post Open - National 6,100.00 0.00 Signed 2023-02-17 2022-04-29 2023-03-03 2023-03-10 2022-07-26 2023-03-12 2022-09-13 2023-04-05 2023-06-04 ie Infrastructure to be used i cation Selection chiuri - Housing spaces & Tra n Disaster Response ining Centre for the Improve ment of Gendarme Staff Ochi uri - Operational headquarter s) RO-GIRG-343836-CS-CQS / T Enhance the Resilience of Se echnical verifiers for 4 invest lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 26,300.00 0.00 2023-02-22 2023-04-07 2023-03-24 2023-04-14 2023-04-21 2023-05-15 2025-08-02 ment objectives (Dragasani, ie Infrastructure to be used i cation Selection ation Ochiuri 1 and 2, Turnu Magur n Disaster Response ele) RO-GIRG-344124-CS-CQS / T Enhance the Resilience of Se echnical verifiers for 2 invest lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 9,400.00 0.00 2023-02-28 2023-05-16 2023-03-21 2023-05-04 2023-06-03 2023-07-08 2025-07-27 ment objectives requiring Ind ie Infrastructure to be used i cation Selection ation ustrial Security Clearance (Fa n Disaster Response lticeni 1 and 2) RO-GIRG-344144-CS-CQS / T Enhance the Resilience of Se echnical verifiers for 2 invest lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 9,200.00 0.00 2023-02-28 2023-05-16 2023-03-21 2023-05-04 2023-06-03 2023-07-08 2025-07-27 ment objectives requiring Ind ie Infrastructure to be used i cation Selection ation ustrial Security Clearance (D n Disaster Response ambovita 1 and 2) RO-GIRG-344145-CS-CQS / F Enhance the Resilience of Se S+TD+TA for Dragasani Milit lected Romanian Gendarmer Consultant Qualifi Under Implement ary School for Gendarme Non IBRD / 89500 Post Open - National 157,000.00 0.00 2023-02-28 2023-02-28 2023-03-21 2023-05-04 2023-06-03 2023-07-08 2025-07-27 ie Infrastructure to be used i cation Selection ation -Commissioned Officers - de n Disaster Response molition and new building157 RO-GIRG-344148-CS-CQS / D Enhance the Resilience of Se AIW+TD+TA for Ochiuri Train lected Romanian Gendarmer Consultant Qualifi Under Implement ing Center (building 1) & Hou IBRD / 89500 Post Open - National 65,000.00 0.00 2023-02-28 2023-03-10 2023-03-21 2023-05-04 2023-06-03 2023-07-08 2025-07-27 ie Infrastructure to be used i cation Selection ation sing spaces and Operational n Disaster Response Headquarters (building 2)- re trofitting and modernizing RO-GIRG-344152-CS-CQS / D AIW+TD+TA for Falticeni Mili Enhance the Resilience of Se tary School - Educational and lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 119,000.00 0.00 2023-02-28 2023-03-18 2023-03-21 2023-05-04 2023-06-03 2023-07-08 2025-07-27 Training Center (building 1) ie Infrastructure to be used i cation Selection ation & Operational Headquarters ( n Disaster Response building 2)- retrofitting and modernizing RO-GIRG-344153-CS-CQS / D Enhance the Resilience of Se AIW+TD+TA for Dambovita lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 142,000.00 0.00 2023-02-28 2023-03-21 2023-03-21 2023-05-04 2023-06-03 2023-07-08 2025-07-27 Operational Headquarters (b ie Infrastructure to be used i cation Selection ation uilding 1 and 2) - retrofitting n Disaster Response and modernizing RO-GIRG-344157-CS-CQS / D Enhance the Resilience of Se AIW+TD+TA for Turnu Magur lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 137,000.00 0.00 2023-02-28 2023-03-10 2023-03-21 2023-05-04 2023-06-03 2023-07-08 2025-07-27 ele Operational Headquarters ie Infrastructure to be used i cation Selection ation - partial demolition and retrof n Disaster Response itting RO-GIRG-355803-CS-LCS / A udit services of the Project Fi Least Cost Selecti Under Implement IBRD / 89500 Project Management Post Open - National 44,500.00 0.00 2023-04-11 2023-04-17 2023-04-11 2023-04-18 2023-05-03 2023-04-28 2023-05-17 2023-05-01 2023-05-18 2023-05-12 2023-06-06 2023-05-31 2026-04-30 nancial Statements funded u on ation nder IBRD Loan no. 8950-RO RO-GIRG-357771-CS-CQS / S Enhance the Resilience of Se ite Supervision of the works f lected Romanian Gendarmer Consultant Qualifi Under Implement IBRD / 89500 Post Open - National 15,000.00 0.00 2023-04-24 2023-04-25 2023-05-15 2023-06-05 2023-06-06 2023-06-19 2023-06-19 2023-06-28 2024-12-19 or OCHIURI Training Centre, ie Infrastructure to be used i cation Selection ation building 45-254-03 n Disaster Response RO-GIRG-361944-CS-CQS / D Enhance the Resilience of Se AIW+TD+TA for D.G.J.M.B Op lected Romanian Gendarmer Consultant Qualifi Pending Impleme IBRD / 89500 Post Open - National 318,000.00 0.00 2023-05-26 2023-06-16 2023-07-30 2023-08-29 2023-10-03 2025-10-22 erational Headquarters - retr ie Infrastructure to be used i cation Selection ntation ofitting and modernizing n Disaster Response RO-GIRG-361947-CS-CQS / T Enhance the Resilience of Se echnical verifiers for D.G.J.M. lected Romanian Gendarmer Consultant Qualifi Pending Impleme IBRD / 89500 Post Open - National 36,000.00 0.00 2023-06-09 2023-06-30 2023-08-13 2023-09-12 2023-10-17 2025-11-05 B investment objectiv requiri ie Infrastructure to be used i cation Selection ntation ng Industrial Security Cleara n Disaster Response nce. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2 RO-GIRG-192380-CS-INDV / Individual Consult IBRD / 89500 Project Management Prior Open 171,000.00 0.00 Canceled 2022-05-01 2022-04-21 2022-06-19 2022-07-10 2022-08-14 2025-12-31 Procurement specialist (first) ant Selection RO-GIRG-192405-CS-INDV / Individual Consult Under Implement IBRD / 89500 Project Management Post Open 228,000.00 0.00 2022-05-01 2022-04-20 2022-06-19 2022-07-10 2022-08-14 2025-12-31 Architect (first) ant Selection ation RO-GIRG-192403-CS-INDV / Individual Consult IBRD / 89500 Project Management Post Open 171,000.00 0.00 Canceled 2022-05-01 2022-04-20 2022-06-19 2022-07-10 2022-08-14 2025-12-31 Monitoring and Evaluation sp ant Selection ecialist RO-GIRG-192399-CS-INDV / Individual Consult IBRD / 89500 Project Management Post Open 57,000.00 0.00 Canceled 2022-05-01 2022-04-20 2022-06-19 2022-07-10 2022-08-14 2025-12-31 Social specialist ant Selection RO-GIRG-192409-CS-INDV / Individual Consult IBRD / 89500 Project Management Post Open 114,000.00 0.00 Canceled 2022-05-01 2022-04-20 2022-06-19 2022-07-10 2022-08-14 2025-12-31 Secretary ant Selection RO-GIRG-192402-CS-INDV / Individual Consult IBRD / 89500 Project Management Post Open 57,000.00 0.00 Canceled 2022-05-01 2022-04-20 2022-06-19 2022-07-10 2022-08-14 2025-12-31 Environmental specialist ant Selection RO-GIRG-192407-CS-INDV / I Individual Consult IBRD / 89500 Project Management Post Open 171,000.00 0.00 Canceled 2022-12-31 2023-02-18 2023-03-11 2023-04-15 2025-12-31 nstalation Engineer (first) ant Selection RO-GIRG-192408-CS-INDV / I Individual Consult IBRD / 89500 Project Management Post Open 171,000.00 0.00 Canceled 2022-12-31 2023-02-18 2023-03-11 2023-04-15 2025-12-31 nstallation Engineer (second) ant Selection RO-GIRG-192404-CS-INDV / Individual Consult IBRD / 89500 Project Management Post Open 171,000.00 0.00 Canceled 2022-11-30 2023-01-18 2023-02-08 2023-03-15 2025-12-31 Structural engineer (first) ant Selection RO-GIRG-323519-CS-CDS / P rocurement Specialist Extern IBRD / 89500 Project Management Post Direct Selection Direct - National 8,500.00 0.00 Signed 2022-10-31 2022-11-02 2022-11-10 2022-11-09 2023-01-14 2023-07-03 al Consultant RO-GIRG-355805-CS-INDV / Individual Consult Under Implement Procurement Specialist (Nati IBRD / 89500 Project Management Post Open - National 125,000.00 0.00 2023-04-18 2023-06-26 2023-05-22 2023-06-01 2023-07-06 2025-12-31 ant Selection ation onal) - Individual Consultant RO-GIRG-360247-CS-INDV / Individual Consult Under Implement Structural Engineer 1 (Nation IBRD / 89500 Project Management Post Open - National 150,000.00 0.00 2023-05-11 2023-05-18 2023-06-03 2023-06-05 2023-06-12 2025-12-31 ant Selection ation al) – Individual Consultant RO-GIRG-360249-CS-INDV / Individual Consult Pending Impleme Structural Engineer 2 (Nation IBRD / 89500 Project Management Post Open - National 150,000.00 0.00 2023-05-11 2023-06-03 2023-06-06 2023-06-13 2025-12-31 ant Selection ntation al) – Individual Consultant RO-GIRG-360250-CS-INDV / I Individual Consult Under Implement nstallation Engineer 1 (Natio IBRD / 89500 Project Management Post Open - National 144,000.00 0.00 2023-05-14 2023-06-23 2023-06-05 2023-06-26 2023-07-15 2025-12-31 ant Selection ation nal) – Individual Consultant RO-GIRG-360252-CS-INDV / I Individual Consult Pending Impleme nstallation Engineer 2 (Natio IBRD / 89500 Project Management Post Open - National 144,000.00 0.00 2023-05-14 2023-06-04 2023-06-07 2023-06-14 2025-12-31 ant Selection ntation nal) – Individual Consultant RO-GIRG-360254-CS-INDV / Individual Consult Under Implement Financial Specialist (National) IBRD / 89500 Project Management Post Open - National 105,000.00 0.00 2023-05-16 2023-06-08 2023-06-06 2023-06-11 2023-06-19 2025-12-31 ant Selection ation – Individual Consultant Page 3 PROCUREMENT PLAN (Textual Part) Project information: Burundi - Great Lakes Trade Facilitation and Integration Project] (P174814) Project Implementation agency: Burundi-Ministry of Finance, Budget and Privatization Date of the Procurement Plan: November 8, 2021 Period covered by this Procurement Plan: December 2017 – December 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the country procurement handbook, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. - The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. - Rights for the Bank to review procurement documentation and activities. - An effective complaints mechanism. - Maintenance of records of the Procurement Process When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables : Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is Not Applicable Works: is not Applicable PROCUREMENT Eastern and Southern Africa : Great Lakes Trade Facilitation and Integration Project PLAN General Information Country: Eastern and Southern Africa 2018-07-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P174814 GPN Date: Project Name: Great Lakes Trade Facilitation and Integration Project Loan / Credit No: IDA / V1000, IDA / V3250, IDA / V0960, IDA / V3940, IDA / E0700, IDA / E0710 Burundi-Ministry of Finance, Budget and Privatization Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BI-BI-MOF-71885-CW-DIR / A Component 1. Improving Poli Under Imple 2019-01-1 dduction d'eau au poste front IDA / V1000 cy and Regulatory Environm Prior Direct Selection Direct 28,600.00 0.00 2018-07-27 2018-08-01 2018-09-18 mentation 7 ière de Gatumba (Interventio ent for cross border trade n rapide) BI-BI-MOF-71888-CW-RFQ / Improving core trade infrastr Aménagement des Latrines e Request for Quota Single Stage - One E 2019-01-0 IDA / V1000 ucture and facilities in the b Post Limited 11,000.00 10,186.24 Completed 2018-08-11 2018-08-10 2018-10-02 2018-09-06 t douches au port de Rumon tions nvelope 4 order areas ge (Intervention urgente) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-BI-MOF-170418-GO-RFQ / Implementation support, Co Request for Quota Single Stage - One E Acquisition des équipements IDA / V3250 mmunication, Monitoring, an Post Limited 50,000.00 16,881.67 Signed 2020-07-25 2022-02-22 2020-09-19 2022-01-25 2020-10-30 tions nvelope de bureau (mobilier et photo d Evaluation copieuse) BI-BI-MOF-170426-GO-RFQ / Implementation support, Co Request for Quota Single Stage - One E Acquisition du matériel infor IDA / V3250 mmunication, Monitoring, an Post Limited 30,000.00 42,446.89 Completed 2020-07-12 2020-10-12 2020-08-28 2021-01-20 2020-10-09 2021-06-08 tions nvelope matique pour l'UGP d Evaluation BI-BI-MOF-170423-GO-RFB / Implementation support, Co Acquisition de Trois véhicules Single Stage - One E IDA / V3250 mmunication, Monitoring, an Post Request for Bids Open - National 250,000.00 0.00 Canceled 2020-07-15 2020-07-20 2020-08-31 2020-09-15 2020-10-09 2020-12-01 (One station wagon 4*4 et de nvelope d Evaluation ux camionnettes) BI-BI-MOF-319184-GO-RFB / Component 4: Supporting Im Single Stage - One E Pending Impl Acquisition des équipements IDA / E0700 plementation and Monitoring Post Request for Bids Open - National 50,000.00 0.00 2022-12-15 2022-12-20 2023-01-31 2023-03-02 2023-04-06 2023-06-15 nvelope ementation mobiliers pour l'UGP and Evaluation BI-BI-MOF-319187-GO-RFB / Component 4: Supporting Im Single Stage - One E Pending Impl Acquisition du matériel infor IDA / E0700 plementation and Monitoring Post Request for Bids Open - National 100,000.00 0.00 2022-12-15 2022-12-20 2023-01-31 2023-03-02 2023-04-06 2023-06-30 nvelope ementation matique pour l'UGP and Evaluation BI-BI-MOF-319182-GO-RFB / Component 4: Supporting Im Acquisition de 4 véhicules (1 Single Stage - One E IDA / E0700 plementation and Monitoring Post Request for Bids Open - National 350,000.00 0.00 Canceled 2022-11-15 2022-11-20 2023-01-01 2023-01-20 2023-02-17 2023-04-21 jeep station wagon ou équiva nvelope and Evaluation lent + 3 pick up) BI-BI-MOF-355350-GO-DIR / Acquisition de 4 véhicules (1 Component 4: Supporting Im Direct - Internation Under Imple station wagon 4X4 et 3 cami IDA / E0700 plementation and Monitoring Post Direct Selection 300,000.00 0.00 2023-04-21 2023-06-02 2023-05-02 2023-03-25 2023-05-23 2023-11-19 al mentation onnettes double cabine 4X4) and Evaluation auprès de l'agence des Natio ns Unies UNOPS BI-BI-MOF-357226-GO-RFB / Component 4: Supporting Im Open - Internationa Single Stage - One E Pending Impl Acquisition d'un système de IDA / E0700 plementation and Monitoring Post Request for Bids 60,000.00 0.00 2023-04-28 2023-05-03 2023-06-14 2023-06-21 2023-07-26 2023-10-27 l nvelope ementation vidéoconférence and Evaluation BI-BI-MOF-360294-GO-RFB / Component 4: Supporting Im Single Stage - One E Pending Impl Acquisition de 14 batteries d' IDA / E0700 plementation and Monitoring Post Request for Bids Open - National 20,000.00 0.00 2023-05-19 2023-05-24 2023-07-05 2023-08-04 2023-09-08 2023-12-15 nvelope ementation un système de back-up élect and Evaluation rique BI-BI-MOF-367786-GO-RFQ / Component 4: Supporting Im Request for Quota Single Stage - One E Pending Impl Acquisition du mobilier de bu IDA / E0700 plementation and Monitoring Post Limited 10,000.00 0.00 2023-07-05 2023-08-16 2023-10-20 tions nvelope ementation reau and Evaluation BI-BI-MOF-367788-GO-RFQ / Component 4: Supporting Im Request for Quota Single Stage - One E Pending Impl Acquisition du matériel infor IDA / E0700 plementation and Monitoring Post Limited 15,000.00 0.00 2023-07-10 2023-08-21 2023-10-27 tions nvelope ementation matique pour l'UGP and Evaluation BI-BI-MOF-367790-GO-RFQ / Component 4: Supporting Im Request for Quota Single Stage - One E Pending Impl Acquisition des climatiseurs IDA / E0700 plementation and Monitoring Post Limited 18,000.00 0.00 2023-07-16 2023-08-25 2023-11-30 tions nvelope ementation de remplacement and Evaluation NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DMI/010/PFCGL-II/2018 / Con Improving core trade infrastr ception détaillée nécessaire Quality And Cost- Open - Internationa IDA / V1000 ucture and facilities in the b Post 200,000.00 187,605.23 Completed 2018-04-20 2018-04-16 2018-06-15 2018-09-13 2018-07-22 2018-07-05 2018-08-23 2018-09-28 2018-09-15 2018-10-05 2018-10-20 2018-10-23 2018-11-10 2018-02-15 2019-02-11 2019-11-06 pour le site du projet de cons Based Selection l order areas truction du Port de Rumonge BI-BI-MOF-65618-CS-QCBS / Improving core trade infrastr Conception détaillée nécessa Quality And Cost- Open - Internationa IDA / V1000 ucture and facilities in the b Post 200,000.00 0.00 Canceled 2018-07-05 2018-07-26 2018-08-31 2018-10-03 2018-10-19 2018-11-16 2018-12-07 2019-02-07 ire pour les sites du poste fro Based Selection l order areas ntalier et du marché frontalie r de Gatumba Page 1 BI-BI-MOF-65723-CS-QCBS / Improving core trade infrastr Conception des infrastructur Quality And Cost- IDA / V1000 ucture and facilities in the b Post Open - National 60,000.00 0.00 Canceled 2018-07-15 2018-08-10 2018-09-10 2018-10-15 2018-10-31 2018-11-21 2018-12-05 2019-03-05 es provisoires aux postes fro Based Selection order areas ntaliers de Gatumba et au po rt de Rumonge BI-BI-MOF-71876-CS-QCBS / Improving core trade infrastr Conception détaillée nécessa Quality And Cost- Open - Internationa IDA / V1000 ucture and facilities in the b Post 80,000.00 118,150.00 Completed 2018-08-20 2018-11-19 2018-09-10 2018-11-20 2018-10-15 2019-01-24 2018-11-27 2019-01-15 2018-12-14 2019-01-25 2019-01-18 2019-04-15 2019-02-22 2020-08-20 2019-05-27 2021-07-05 ire pour les sites du poste fro Based Selection l order areas ntière de Gatumba BI-BI-MOF-71879-CS-QCBS / Improving core trade infrastr Quality And Cost- Conception détaillée nécessa IDA / V1000 ucture and facilities in the b Post Open - National 43,130.00 8,504.99 Completed 2018-08-23 2018-09-07 2018-09-13 2018-09-12 2018-10-19 2018-11-08 2018-11-23 2019-01-15 2018-12-10 2019-10-28 2019-01-14 2019-10-28 2019-02-11 2019-03-20 2019-05-13 2020-04-22 Based Selection ire pour le marché frontalier order areas de Gatumba BI-BI-MOF-96822-CS-LCS / A Implementation support, Co udit comptable et financier d Least Cost Selecti Open - Internationa IDA / V1000 mmunication, Monitoring, an Post 25,000.00 13,684.46 Completed 2019-01-28 2019-02-22 2019-02-18 2019-05-20 2019-04-03 2019-10-30 2019-05-01 2019-10-30 2019-05-31 2019-10-30 2019-07-05 2022-02-19 2019-08-09 2019-11-19 2020-02-05 2019-12-06 u PFCGL-II de la période allan on l d Evaluation t du 07/08/2017 au 30/06/20 19 BI-BI-MOF-102626-CS-QCBS / Recrutement d'une firme de Improving core trade infrastr consultants pour le contrôle Quality And Cost- Open - Internationa IDA / V1000 ucture and facilities in the b Post 100,000.00 0.00 Canceled 2019-03-14 2019-04-04 2019-05-17 2019-07-04 2019-07-19 2019-08-16 2019-10-08 2020-10-07 et la surveillance des travaux Based Selection l order areas de construction du port de R umonge et provision de servi ces connexes BI-BI-MOF-203512-CS-CQS / Recrutement d'un bureau en charge de l'élaboration de l'é Improving core trade infrastr tude technique pour l'aména Consultant Qualifi Open - Internationa IDA / V3250 ucture and facilities in the b Post 80,000.00 0.00 Canceled 2020-12-01 2020-12-08 2021-01-14 2021-01-29 2021-02-11 2021-05-11 gement et le bitumage de la cation Selection l order areas RP 108: RN4(PK 14 + 8)/Gatu mba-Vuggizo/Frontière RDC ( 8km)+Etude d'Impact Enviro nnemental et Social (EIES) BI-BI-MOF-203525-CS-CQS / Improving core trade infrastr Etude de faisabilité sur les ch Consultant Qualifi Open - Internationa IDA / V3250 ucture and facilities in the b Post 200,000.00 0.00 Canceled 2020-12-15 2020-12-22 2021-02-04 2021-02-18 2021-03-04 2021-05-19 aînes de valeur des produits cation Selection l order areas agricoles, de pêche et de frui ts BI-BI-MOF-203488-CS-CQS / Etude pour la construction du Improving core trade infrastr marché transfrontalier de Ru Consultant Qualifi IDA / V3250 ucture and facilities in the b Post 50,000.00 0.00 Canceled 2020-11-27 2020-12-10 2021-01-23 2021-02-10 2021-03-17 2021-05-25 monge (incluant l'étude de re cation Selection order areas ntabilité et Etude d'Impact E nironnemental et Social (EIES )) BI-BI-MOF-204468-CS-QCBS / Recrutement d'un cabinet p Implementation of policy an our la réalisation de l'audit o d procedural reforms and ca pérationnel des administratio Quality And Cost- Open - Internationa IDA / V3250 pacity building to facilitate c Post 150,000.00 0.00 Canceled 2020-12-21 2021-01-04 2021-02-03 2021-03-11 2021-03-30 2021-05-04 2021-05-31 2021-10-14 ns des services des frontière Based Selection l ross-border trade in goods a s: étude sur l'efficacité et l'ef nd servic es ficience institutionnelle des a dministrations des services d es frontières BI-BI-MOF-207626-CS-CQS / Component 1. Improving Poli Etude pour la constructiondu Consultant Qualifi Pending Impleme IDA / V3250 cy and Regulatory Environm Post Open - National 40,000.00 0.00 2021-03-08 2021-03-15 2021-04-28 2021-05-28 2021-06-11 2021-09-30 marché transfrontalier de Ru cation Selection ntation ent for cross border trade monge incluant l'étude de re ntabilité BI-BI-MOF-207711-CS-CQS / Etude technique pour l'amén Component 1. Improving Poli Consultant Qualifi Open - Internationa Under Implement agement et le bitumage de l IDA / V3250 cy and Regulatory Environm Post 55,000.00 0.00 2020-12-09 2021-01-27 2020-12-14 2021-02-15 2021-01-20 2022-02-21 2021-02-05 2021-02-15 2021-05-28 cation Selection l ation a RP 108: RN4 (PK14 + 8)Gat ent for cross border trade umba-Vugizo/frontière BI-BI-MOF-207744-CS-CQS / Recrutement d'un cabinet po Implementation of policy an ur la réalisation de l'audit op d procedural reforms and ca érationnel des administration Consultant Qualifi Open - Internationa IDA / V3250 pacity building to facilitate c Post 150,000.00 108,130.00 Signed 2021-01-15 2020-12-21 2021-01-29 2021-03-15 2021-03-14 2022-02-17 2021-04-13 2022-02-17 2021-05-04 2021-12-03 2021-10-31 s des services des frontières cation Selection l ross-border trade in goods a : étude sur l'efficacité et l'effi nd servic es cience institutionnelle des ad ministrations des services de s frontières BI-BI-MOF-207751-CS-CQS / Improving core trade infrastr Etude de faisabilité sur les ch Consultant Qualifi Open - Internationa IDA / V3250 ucture and facilities in the b Post 200,000.00 0.00 Canceled 2020-12-15 2020-12-21 2020-12-22 2021-01-26 2021-02-04 2022-02-18 2021-03-06 2021-03-19 2021-06-18 aînes de valeurs des produits cation Selection l order areas agricoles, de pêche et de frui ts BI-BI-MOF-221288-CS-LCS / Implementation support, Co Audit comptable et financier Least Cost Selecti Open - Internationa IDA / V0960 mmunication, Monitoring, an Post 20,000.00 6,074.00 Completed 2021-03-02 2021-03-01 2021-03-23 2021-05-10 2021-05-06 2022-02-15 2021-06-03 2022-02-15 2021-07-03 2022-02-21 2021-08-07 2022-02-21 2021-10-15 2021-12-07 2021-12-15 2021-12-25 du projet pour la période alla on l d Evaluation nt du 01/07/2020 au 30/06/2 021 BI-BI-MOF-290037-CS-QCBS Component 3: Supporting Co / Recrutement d'un coonsulta Quality And Cost- Open - Internationa Under Implement IDA / V3250 mmercialization of Selected Post 200,000.00 0.00 2022-04-14 2022-04-13 2022-04-20 2022-07-12 2022-05-20 2023-03-22 2022-06-17 2022-07-11 2022-08-15 2022-09-19 2022-12-30 nt chargé de l'étude de l"état Based Selection l ation Cross-border Value Chains des lieux des chaînes de vale ur de l'agribusiness BI-BI-MOF-303406-CS-QCBS / Recrutement d'un consultan Component 3: Supporting Co t chargé de l'élaboration du Quality And Cost- Open - Internationa IDA / V3940 mmercialization of Selected Post 100,000.00 0.00 Canceled 2022-08-19 2022-10-04 2022-09-09 2022-10-23 2022-11-20 2022-12-20 2023-01-24 2023-02-28 2023-04-26 manuel de gestion des subve Based Selection l Cross-border Value Chains ntions aux associations et co opératives des commerçants dans le cadre du PFCIGL BI-BI-MOF-319236-CS-QCBS / Recrutement d'un bureau p our l'élaboration d'une étude Component 2: Improving Cor Quality And Cost- Open - Internationa Under Implement IDA / E0700 Post 200,000.00 0.00 2022-11-02 2023-01-13 2022-11-09 2023-04-07 2022-12-23 2023-01-20 2023-02-10 2023-03-03 2023-03-31 2023-07-14 technique pour l'aménageme e Trade Infrastructure Based Selection l ation nt et modernisation des infra structures du poste frontière de Vugizo-Kiliba BI-BI-MOF-207635-CS-CQS / Component 1. Improving Poli Etude pour l'aménagement e Consultant Qualifi Open - Internationa IDA / V3250 cy and Regulatory Environm Post 40,000.00 0.00 Canceled 2020-12-11 2020-12-22 2020-12-18 2021-01-26 2021-01-22 2021-02-21 2021-03-05 2021-05-17 t la modernisation du poste-f cation Selection l ent for cross border trade rontière Vugizo-Kiliba Page 2 BI-BI-MOF-203504-CS-CQS / Recrutement d'un bureau ch argé de l'élaboration de l'étu Improving core trade infrastr Consultant Qualifi de pour l'aménagement et m IDA / V3250 ucture and facilities in the b Post Open - National 60,000.00 0.00 Canceled 2020-11-18 2020-11-25 2021-01-08 2021-02-07 2021-02-19 2021-04-26 cation Selection odernisation poste-frontière order areas Vugizo-Kiliba + Etude d'Imp act Environnemental et Socia l (EIES) BI-BI-MOF-335979-CS-QCBS / Recrutement d'un bureau d' un bureau pour la réalisation Component 2: Improving Cor Quality And Cost- Open - Internationa Under Implement de la réalisation d'une étude IDA / E0700 Post 100,000.00 0.00 2023-01-20 2023-04-04 2023-01-25 2023-06-05 2023-02-17 2023-04-03 2023-04-14 2023-05-12 2023-06-09 2023-09-15 e Trade Infrastructure Based Selection l ation de rentabilité économique et l'adaptation de l'étude techni que pour la construction du marché transfrontalier de Ga tumba BI-BI-MOF-335987-CS-QCBS / Recrutement d'un bureau p Component 2: Improving Cor Quality And Cost- Open - Internationa Under Implement our la surveillance/contrôle d IDA / E0700 Post 700,000.00 0.00 2023-01-20 2023-01-18 2023-01-27 2023-04-05 2023-02-17 2023-04-04 2023-04-14 2023-05-05 2023-05-29 2024-05-28 e Trade Infrastructure Based Selection l ation es travaux de construction d u poste frontière de Gatumb a-Kavimvira BI-BI-MOF-335989-CS-QCBS / Recrutement d'un bureau p our la surveillance/contrôle d Component 2: Improving Cor Quality And Cost- Open - Internationa Under Implement es travaux de construction d IDA / E0700 Post 1,800,000.00 0.00 2023-01-24 2023-01-19 2023-01-31 2023-02-23 2023-02-21 2023-04-05 2023-04-19 2023-05-05 2023-05-31 2026-05-29 e Trade Infrastructure Based Selection l ation u port de Rumonge et provisi on de services connexes y co mpris l'actualisation des étud es techniques BI-BI-MOF-338261-CS-QCBS / Recrutement d'un bureau c hargé de l'élaboration de l'ét Component 2: Improving Cor Quality And Cost- Open - Internationa Under Implement IDA / E0710 Post 200,000.00 0.00 2023-02-15 2023-01-25 2023-02-21 2023-03-30 2023-03-30 2023-05-10 2023-05-26 2023-06-30 2023-07-21 2023-10-30 ude technique d'aménageme e Trade Infrastructure Based Selection l ation nt et de bitumage de la RP 1 08: RN 4/Gatumba - Vugizo/fr ontière RDC (8 km) BI-BI-MOF-338268-CS-QCBS / Recrutement d'une firme ch Component 3: Supporting Co Quality And Cost- Open - Internationa Under Implement argée de la gestion du méca IDA / E0700 mmercialization of Selected Post 300,000.00 0.00 2023-02-20 2023-03-13 2023-02-27 2023-03-30 2023-04-05 2023-05-12 2023-05-26 2023-06-30 2023-07-21 2025-07-18 Based Selection l ation nisme de subventions aus as Cross-border Value Chains sociations et coopératives de commerçants BI-BI-MOF-357217-CS-QCBS / Recrutement d'un bureau d' Component 2: Improving Cor Quality And Cost- Open - Internationa Under Implement étude pour l'aménagement e IDA / E0700 Post 400,000.00 0.00 2023-04-24 2023-04-26 2023-04-26 2023-06-12 2023-06-02 2023-07-07 2023-07-28 2023-08-25 2023-09-22 2023-12-29 e Trade Infrastructure Based Selection l ation t modernisation des postes fr ontières de Buganda et Mpar ambo BI-BI-MOF-362749-CS-QCBS / Recrutement d'une ONG po Component 4: Supporting Im Quality And Cost- Open - Internationa Under Implement ur la mise en oeuvre des PAR IDA / E0700 plementation and Monitoring Post 100,000.00 0.00 2023-05-31 2023-05-29 2023-06-07 2023-07-14 2023-08-11 2023-08-25 2023-09-22 2023-10-20 2024-06-28 Based Selection l ation du port de Rumonge et du po and Evaluation ste frontière de Gatumba BI-BI-MOF-365295-CS-QCBS / Recrutement d'un bureau c hargé de l'étude d'aménage Component 2: Improving Cor Quality And Cost- Open - Internationa IDA / E0700 Post 200,000.00 0.00 Under Review 2023-06-12 2023-06-19 2023-06-20 2023-08-03 2023-08-31 2023-09-22 2023-10-20 2023-11-17 2024-02-28 ment et de bitumage des voi e Trade Infrastructure Based Selection l es d'accès aux postes frontiè res de Buganda et Mparamb o BI-BI-MOF-367793-CS-LCS / Component 4: Supporting Im Least Cost Selecti Recrutement d'un cabinet d' IDA / E0700 plementation and Monitoring Post Open - National 15,000.00 0.00 Under Review 2023-06-30 2023-06-27 2023-07-10 2023-08-16 2023-08-23 2023-09-08 2023-09-29 2023-10-27 2024-10-26 on audit interne du projet and Evaluation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DMI/002/PFCGL-II/2017 / Ela boration du Cadre de Politiqu e des Peuples Autochtones ( Improving core trade infrastr Individual Consult Pending Impleme CPPA), du Plan en faveur des IDA / V1000 ucture and facilities in the b Post Open 30,000.00 0.00 2017-12-11 2018-01-20 2018-02-06 2018-02-09 2018-03-18 ant Selection ntation populations autochtones (PP order areas A) du Cadre de Politique de R éinstallation (CPR) pour les a ctivitésdu Projet GLTFP BI-BI-MOF-65639-CS-INDV / Improving core trade infrastr Individual Consult IDA / V1000 Post Open 50,000.00 0.00 Canceled 2018-07-27 2018-09-05 2018-09-19 2018-10-04 2018-12-18 Etude sur la logistique et le tr ucture and facilities in the b ant Selection ansport order areas BI-BI-MOF-65645-CS-INDV / Implementation of policy an Enquête auprès des commer d procedural reforms and ca Individual Consult çants des associations profes IDA / V1000 pacity building to facilitate c Post Open 60,000.00 0.00 Canceled 2018-08-05 2018-09-12 2018-09-26 2018-10-10 2019-01-10 ant Selection sionnelles et évaluation des ross-border trade in goods a besoins pour le renforcement nd servic es des capacités BI-BI-MOF-71086-CS-INDV / Implementation support, Co Individual Consult Pending Impleme Consultant Expert en Sauveg IDA / V1000 mmunication, Monitoring, an Post Open 40,800.00 0.00 2018-07-24 2018-10-28 2018-11-20 2018-11-23 2019-05-19 ant Selection ntation ardes Environnementales et d Evaluation Sociales BI-BI-MOF-71104-CS-INDV / Improving core trade infrastr Elaboration du Cadre de Gest Individual Consult Pending Impleme IDA / V1000 ucture and facilities in the b Post Open 16,210.00 0.00 2018-07-24 2018-08-31 2018-09-24 2018-09-25 2018-11-01 ion Environnementale et Soci ant Selection ntation order areas ale (CGES) du Projet GLTFP DMI/006/PFCGL-II/2018 / Con Implementation support, Co Individual Consult Pending Impleme sultant Responsable en Suivi- IDA / V1000 mmunication, Monitoring, an Post Open 40,800.00 0.00 2018-07-24 2018-09-16 2018-12-02 2018-12-03 2019-12-02 ant Selection ntation Evaluation d Evaluation DMI/004/PFCGL-II/2018 / Con Implementation support, Co Individual Consult Under Implement sultant Expert en Facilitation IDA / V1000 mmunication, Monitoring, an Post Open 40,800.00 0.00 2018-01-26 2018-01-25 2018-05-25 2018-05-25 2018-05-28 2019-05-27 ant Selection ation du Commerce d Evaluation BI-BI-MOF-65604-CS-INDV / Implementation support, Co Individual Consult Pending Impleme Consultant Responsable Adm IDA / V1000 mmunication, Monitoring, an Post Open 40,800.00 0.00 2018-06-07 2018-07-10 2018-07-17 2018-07-23 2019-07-22 ant Selection ntation inistratif et Financier d Evaluation DMI/003/PFCGL-II/2018 / Con Implementation support, Co Individual Consult sultant Coordinateur du proje IDA / V1000 mmunication, Monitoring, an Post Open 48,000.00 0.00 Under Review 2018-01-26 2018-01-19 2018-05-10 2018-05-10 2018-05-14 2019-05-13 ant Selection t d Evaluation Page 3 DMI/007/PFCGL-II/2018 / Con Implementation support, Co Individual Consult Pending Impleme sultant Responsable Passatio IDA / V1000 mmunication, Monitoring, an Post Open 40,800.00 0.00 2018-01-26 2018-05-25 2018-05-28 2018-05-28 2019-05-27 ant Selection ntation n des Marchés d Evaluation Implementation support, Co DMI/009/PFCGL-II/2018 / Con Individual Consult IDA / V1000 mmunication, Monitoring, an Post Open 24,000.00 0.00 Under Review 2018-01-26 2018-06-08 2018-06-05 2018-06-07 2018-07-01 2019-06-30 sultant Comptable du projet ant Selection d Evaluation BI-BI-MOF-65720-CS-INDV / Implementation of policy an Enumérateurs et Superviseur d procedural reforms and ca Individual Consult Under Implement s pour l'enquête de base et p IDA / V1000 pacity building to facilitate c Post Open 16,631.00 0.00 2018-06-27 2018-11-05 2018-08-06 2018-08-20 2018-08-31 2018-10-31 ant Selection ation our la collecte des données s ross-border trade in goods a ur le commerce transfrontali nd servic es er BI-BI-MOF-170399-CS-INDV / Recrutement d'un consultant Improving service delivery b Individual Consult pour réaliser l'identification e IDA / V3250 y agencies at the border/por Post Open 30,000.00 43,617.38 Completed 2020-08-25 2020-11-05 2020-10-13 2022-02-21 2020-11-03 2022-02-21 2020-12-08 2021-01-13 2021-02-13 2021-04-24 ant Selection t la cartographie des associat t and citizen engagement ions des commerçants transf rontaliers BI-BI-MOF-170412-CS-INDV / Implementation support, Co Recrutement d'un consultant Individual Consult Pending Impleme IDA / V3250 mmunication, Monitoring, an Post Open 20,000.00 0.00 2020-07-31 2020-09-18 2020-10-09 2020-11-13 2021-01-22 en charge de l'élaboration d' ant Selection ntation d Evaluation une stratégie de communicat ion du projet BI-BI-MOF-182061-CS-INDV / Implementation support, Co Individual Consult Under Implement Conception et réalisation du IDA / V3250 mmunication, Monitoring, an Post Open 20,000.00 0.00 2020-08-24 2023-02-21 2020-10-12 2020-11-02 2020-12-07 2021-01-29 ant Selection ation site web PFCGL-II d Evaluation BI-BI-MOF-182703-CS-CDS / Implementation support, Co Audit comptable et financier IDA / V3250 mmunication, Monitoring, an Post Direct Selection Direct 20,000.00 10,844.85 Completed 2020-08-04 2020-07-15 2020-08-14 2020-08-11 2020-10-09 2020-11-03 2020-11-30 2020-12-29 du projet (exercice de juillet d Evaluation 2019 à juin 2020) BI-BI-MOF-203519-CS-INDV / Improving core trade infrastr Individual Consult Recrutement d'un consultant IDA / V3250 ucture and facilities in the b Post Open 20,000.00 0.00 Canceled 2020-11-17 2020-12-29 2021-01-12 2021-02-09 2021-03-15 ant Selection pour la mise à jour du CGES order areas et du CPR BI-BI-MOF-207798-CS-INDV / Component 1. Improving Poli Individual Consult Under Implement Recrutement d'un expert en i IDA / V3250 cy and Regulatory Environm Post Open 40,000.00 0.00 2020-12-09 2020-12-18 2021-01-20 2022-01-06 2021-02-03 2022-01-11 2021-02-08 2022-01-31 ant Selection ation nfrastructures ent for cross border trade BI-BI-MOF-207950-CS-CDS / Entente Directe avec le Cons Improving core trade infrastr ultant Dr NIYONKURU Charles IDA / V3250 ucture and facilities in the b Post Direct Selection Direct 15,000.00 0.00 Canceled 2020-12-10 2020-12-14 2020-12-24 2021-01-29 pour l'Elaboration du CGES + order areas Plan de Gestion des Pestes et Pesticides (PGPP) BI-BI-MOF-207964-CS-CDS / Entente Directe avec le Cons ultant CIMPAYE Joachim pour Improving core trade infrastr la Mise à jour des rapports d'I IDA / V3250 ucture and facilities in the b Post Direct Selection Direct 10,000.00 0.00 Canceled 2020-12-12 2020-12-22 2021-01-06 2021-02-15 mpact Environnemental et S order areas ocial (EIES) pour la constructi on du Port de Rumonge et la construction du marché de G atumba BI-BI-MOF-207970-CS-CDS / Entente Directe avec le Cons Improving core trade infrastr ultant Dr MISAGO Aloispour l IDA / V3250 ucture and facilities in the b Post Direct Selection Direct 10,000.00 0.00 Canceled 2020-12-18 2020-12-28 2021-01-13 2021-02-19 a Préparation du Plan dActio order areas n de Réinstallation (PAR) des Personnes affectées pour la c onstruction du Port de Rumo nge BI-BI-MOF-225823-CS-CDS / Entente Directe avec Monsie ur NDIKUMANA Denis pour l'a Improving core trade infrastr ctualisation/mise à jour des E IDA / V0960 ucture and facilities in the b Post Direct Selection Direct 10,000.00 9,834.66 Completed 2021-03-24 2021-03-24 2021-03-26 2021-03-25 2021-04-02 2021-03-31 2021-05-03 2021-10-20 IES du sous-projet de constru order areas ction du port de Rumonge et celui de construction du mar ché transfrontalier de Gatum ba BI-BI-MOF-239602-CS-CDS / Implementation support, Co Entente Directe avec le bure IDA / V0960 mmunication, Monitoring, an Post Direct Selection Direct 79,400.00 70,447.09 Signed 2021-06-22 2021-06-17 2021-07-02 2022-02-15 2021-07-30 2021-10-06 2022-01-14 au GETA pour pour l'élaborat d Evaluation ion du CGES du PFCIGL BI-BI-MOF-207962-CS-CDS / Entente Directe avec le Cons ultant BARAKAMFITIYE Tharci Improving core trade infrastr sse pour l'Elaboration du Cad IDA / V3250 ucture and facilities in the b Post Direct Selection Direct 15,000.00 0.00 Canceled 2020-12-11 2020-12-21 2021-01-12 2021-02-16 re de Politique de Réinstallati order areas on (CPR) + Cadre de Planifica tion en faveur des Peuples A utochtones (CPPA) BI-BI-MOF-246029-CS-CDS / Implementation support, Co Entente directe avec Madam IDA / V0960 mmunication, Monitoring, an Post Direct Selection Direct 26,000.00 33,246.84 Signed 2021-07-30 2021-07-28 2021-08-09 2021-09-03 2021-10-13 2021-05-12 2021-11-01 e Clotilde NIZIGAMA, Coordo d Evaluation nnateur du projet pour l'Actu alisation du contrat BI-BI-MOF-246032-CS-CDS / Entente directe avec Mr BAT Implementation support, Co UNGWANAYO Léonidas, Resp IDA / V0960 mmunication, Monitoring, an Post Direct Selection Direct 21,600.00 30,476.27 Signed 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-07-27 2022-04-30 onsable Administratif et Fina d Evaluation ncier pour l'Actualisation du contrat BI-BI-MOF-246034-CS-CDS / Entente directe avec Monsie Implementation support, Co ur Cyprien BARAMBONERANY IDA / V0960 mmunication, Monitoring, an Post Direct Selection Direct 24,700.00 27,710.10 Signed 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-05-29 2022-04-30 E, Responsable de la Passati d Evaluation on des Marchés pour l'actuali sation du contrat BI-BI-MOF-246037-CS-CDS / Entente directe avec Mr BIRE Implementation support, Co HANISENGE Adophe, Expert IDA / V0960 mmunication, Monitoring, an Post Direct Selection Direct 24,800.00 30,224.40 Signed 2021-07-30 2021-07-29 2021-08-09 2021-09-03 2021-10-13 2021-05-29 2022-04-30 en Facilitation du Commerce d Evaluation et Secteur Privé pour l'actuali sation du contrat BI-BI-MOF-246040-CS-CDS / Entente directe avec Madam Implementation support, Co e KABURA Marie Rose, Respo IDA / V0960 mmunication, Monitoring, an Post Direct Selection Direct 19,800.00 27,705.70 Signed 2021-07-30 2021-07-29 2021-08-09 2021-09-03 2021-10-13 2021-07-21 2022-04-30 nsable des Sauvegardes envi d Evaluation ronnementales pour l'actuali sation du contrat BI-BI-MOF-246044-CS-CDS / Implementation support, Co Entente directe avec Mr Césa IDA / V0960 mmunication, Monitoring, an Post Direct Selection Direct 19,800.00 27,705.70 Signed 2021-07-30 2021-07-29 2021-08-09 2021-09-02 2021-10-13 2021-06-08 2022-04-30 r Abel MAYELE pour l'actualis d Evaluation ation du contrat Page 4 BI-BI-MOF-246046-CS-CDS / Implementation support, Co Entente directe avec Madam IDA / V0960 mmunication, Monitoring, an Post Direct Selection Direct 17,700.00 16,623.42 Signed 2021-07-30 2021-07-28 2021-08-09 2021-09-03 2021-10-13 2021-07-01 2022-04-30 e NIYOKINDI Consolée pour l' d Evaluation actualisation du contrat BI-BI-MOF-253433-CS-INDV / Implementation support, Co Individual Consult Réalisation d'une enquête de IDA / V0960 mmunication, Monitoring, an Post Open 45,000.00 41,703.71 Signed 2021-09-17 2021-09-17 2021-10-29 2022-02-15 2021-11-05 2022-02-15 2021-11-16 2021-12-16 2022-05-15 ant Selection base dans la zone du PFCIGL d Evaluation BI-BI-MOF-257902-CS-INDV / Entente Directe avec Monsie ur Denis NDIKUMANA pour l'É Component 2: Improving Cor Individual Consult laboration du PAR pour la co IDA / V3250 Post Direct 12,000.00 14,557.51 Signed 2021-10-25 2021-11-22 2021-11-04 2022-02-01 2021-11-15 2022-02-01 2021-11-21 2021-12-14 2021-12-31 e Trade Infrastructure ant Selection nstruction du port de Rumon ge et l’actualisation du PAR p our le poste frontière de Gat umba BI-BI-MOF-262743-CS-CDS / Entente Directe avec la firme CHEMAS pour l'élaboration d Component 2: Improving Cor e l'EIES/PGES et du PAR de la IDA / V3250 Post Direct Selection Direct 420,000.00 0.00 Canceled 2021-11-15 2021-11-19 2022-01-14 2022-02-28 e Trade Infrastructure RN3, projet pilote TNM, du Bo ulevard NDADAYE et du Cont ournement Ouest de Bujumb ura pour le PRT BI-BI-MOF-262749-CS-CDS / Entente Directe avec la firme CHEMAS pour l'assistance te chnique en sauvegardes envi Component 2: Improving Cor ronnementales et sociales et IDA / V3250 Post Direct Selection Direct 300,000.00 0.00 Canceled 2021-11-15 2021-11-21 2022-01-05 2022-03-15 e Trade Infrastructure la préparation des dossiers d u Cadre Environnemental et Social pour PRT et le contrô le qualité des documents de sauvegarde du PFCIGL BI-BI-MOF-303392-CS-CDS / Entente Directe avec Mr NIVY Component 4: Supporting Im Under Implement INTIZO Scarie pour l'élaborati IDA / V3940 plementation and Monitoring Post Direct Selection Direct 50,000.00 0.00 2022-07-13 2022-08-11 2022-07-23 2022-10-18 2022-08-30 2022-10-29 ation on des manuels de procédur and Evaluation es et d'execution du Projet BI-BI-MOF-303396-CS-INDV / Component 2: Improving Cor Individual Consult Pending Impleme Etude de rentabilité du marc IDA / V3940 Post Open 50,000.00 0.00 2022-08-15 2022-10-03 2022-10-24 2022-11-28 2023-01-27 e Trade Infrastructure ant Selection ntation hé transfrontalier de Gatumb a BI-BI-MOF-303470-CS-INDV / Component 4: Supporting Im Individual Consult Under Implement Recrutement d'un spécialiste IDA / V3940 plementation and Monitoring Post Open 3,500.00 0.00 2022-07-29 2022-08-24 2022-09-16 2022-10-07 2022-11-11 2023-02-10 ant Selection ation en communication and Evaluation BI-BI-MOF-303472-CS-INDV / Component 4: Supporting Im Individual Consult Under Implement Recrutement d'un spécialiste IDA / V3940 plementation and Monitoring Post Open 4,000.00 0.00 2022-08-04 2022-09-12 2022-09-22 2022-10-13 2022-11-17 2023-02-16 ant Selection ation en VBG and Evaluation BI-BI-MOF-303474-CS-INDV / Component 4: Supporting Im Individual Consult Under Implement Recrutement d'un spécialiste IDA / V3940 plementation and Monitoring Post Open 4,000.00 0.00 2022-08-10 2022-09-06 2022-09-28 2022-10-19 2022-11-23 2023-02-22 ant Selection ation en Développement social and Evaluation BI-BI-MOF-304400-CS-INDV / Actualisation de l'étude d'im Component 4: Supporting Im pact environnemental et soci Individual Consult Under Implement IDA / V3250 plementation and Monitoring Post Open - National 15,000.00 0.00 2022-07-19 2022-08-09 2022-09-06 2022-09-27 2022-11-01 2022-12-06 al (EIES) pour la construction ant Selection ation and Evaluation et modernisation du poste fr ontière de Gatumba-Kavimvir a BI-BI-MOF-312567-CS-CDS / Component 4: Supporting Im Entente Directe avec le cabin Direct - Internation Under Implement IDA / V3250 plementation and Monitoring Post Direct Selection 15,000.00 0.00 2022-09-06 2022-09-19 2022-09-16 2022-10-14 2022-11-11 2022-12-15 et pour l'audit comptable et f al ation and Evaluation inancier exercice de juillet 20 21 à juin 2022 BI-BI-MOF-319230-CS-INDV / Recrutement d'un Consultant pour l'élaboration d'une étud Component 1. Improving Poli e sur les natures et causes d Individual Consult Pending Impleme IDA / E0700 cy and Regulatory Environm Post Open - National 30,000.00 0.00 2022-12-15 2023-02-02 2023-02-23 2023-03-16 2023-05-30 es conflits entre les administr ant Selection ntation ent for cross border trade ations des frontières et les co mmerçants, entre les service s ou entre les commerçants au niveau des frontières ciblé es du projet BI-BI-MOF-319247-CS-INDV / Réalisation de l'Etude d'Impa ct Environnemental et Social Component 2: Improving Cor Individual Consult Pending Impleme IDA / E0700 Post Open - National 25,000.00 0.00 2023-04-20 2023-06-08 2023-06-22 2023-07-13 2023-09-22 (EIES) des travaux d'aménag e Trade Infrastructure ant Selection ntation ement et modernisation des i nfrastructures du poste fronti ère de Vugizo-Kiliba BI-BI-MOF-319248-CS-INDV / Recrutement d'un consultant pour la préparation du plan d Component 2: Improving Cor Individual Consult Pending Impleme 'action de réinstallation des t IDA / E0700 Post Open - National 30,000.00 0.00 2023-04-27 2023-06-08 2023-06-22 2023-07-13 2023-09-29 e Trade Infrastructure ant Selection ntation ravaux d'aménagement et m odernisation des infrastructur es du poste frontière de Vugi zo-Kiliba BI-BI-MOF-335993-CS-INDV / Component 4: Supporting Im Individual Consult Under Implement Recrutement d'un assistant e IDA / E0700 plementation and Monitoring Post Open - National 36,000.00 0.00 2023-01-18 2023-01-19 2023-02-15 2023-03-08 2023-03-30 2024-03-29 ant Selection ation n passation des marchés and Evaluation BI-BI-MOF-335996-CS-INDV / Component 4: Supporting Im Individual Consult Under Implement Recrutement d'un assistant c IDA / E0700 plementation and Monitoring Post Open - National 36,000.00 0.00 2023-01-26 2023-01-30 2023-03-01 2023-03-15 2023-04-05 2024-04-04 ant Selection ation omptable and Evaluation BI-BI-MOF-344280-CS-QCBS Component 4: Supporting Im / Recrutement d'un bureau p Individual Consult Open - Internationa IDA / E0700 plementation and Monitoring Post 100,000.00 0.00 Canceled 2023-03-31 2023-04-03 2023-05-03 2023-05-24 2023-06-21 2023-09-29 our effectuer un audit techni ant Selection l and Evaluation que du Bureau Burundais de Normalisation (BBN) BI-BI-MOF-353142-CS-INDV / Recrutement d'un consultant Component 2: Improving Cor Individual Consult Under Implement individuel pour la conception IDA / E0700 Post Open - National 20,000.00 0.00 2023-03-31 2023-04-03 2023-05-03 2023-05-17 2023-06-16 2023-08-16 e Trade Infrastructure ant Selection ation des infrastructures provisoire s aux postes frontières de Bu ganda et Mparambo Page 5 BI-BI-MOF-360296-CS-CDS / Entente Directe avec le cabin Component 4: Supporting Im Direct - Internation Under Implement et ABC pour l'audit comptabl IDA / E0700 plementation and Monitoring Post Direct Selection 15,000.00 0.00 2023-05-12 2023-05-20 2023-05-22 2023-05-29 2023-07-26 2023-11-15 al ation e et financier de l'exercice de and Evaluation juillet 2022 à juin 2023 BI-BI-MOF-364126-CS-INDV / RECRUTEMENT D'UN CONSUL TANT CHARGE D'EFFECTUER Component 3: Supporting Co UN AUDIT TECHNIQUE ET INS Individual Consult Open - Internationa IDA / E0700 mmercialization of Selected Post 100,000.00 0.00 Under Review 2023-06-05 2023-06-05 2023-07-17 2023-07-31 2023-09-04 2023-11-17 TITUTIONNEL DU BUREAU BU ant Selection l Cross-border Value Chains RUNDAIS DE NORMALISATIO N ET CONTROLE DE LA QUALI TE (BBN) EN MATIERE DE CE RTIFICATION BI-BI-MOF-365300-CS-INDV / Component 4: Supporting Im Recrutement d'un consultant Individual Consult Pending Impleme IDA / E0700 plementation and Monitoring Post Open - National 25,000.00 0.00 2023-07-20 2023-08-31 2023-09-14 2023-10-19 2023-12-15 pour l'élaboration du plan de ant Selection ntation and Evaluation gestion de la biodiversité Page 6 CEEAC – TRUST FUND : N° A 75 08 – ACP –UE PROJECT PLAN DE PASSATION DES MARCHES SIMPLIFIE – PROJET REDUCTION DES RISQUES DE CATASTROPHES VERSION N°1 – FEVRIER 2019 I. GENERAL 1. Informations sur le Projet Donataire : Communauté Economique des Etats de l’Afrique Centrale (CCEAC) Département de l’Intégration Physique, Economique et Monétaire (DIPEM) Nom du Projet : Projet de Renforcement des Capacités de la Coordination de la CEEAC pour la Résilience au Catastrophes Identification : DON N° : A75 08/P 166648 Unité de Gestion du Projet : ACP –UE 2. Date d’approbation par la Banque du Plan de Passation des Marchés : Date de Non Nom de la version du Plan de Objection par la Passation des Marchés Commentaires BIRD _PPM_Simplifié__ ACP-UE 3. Date de publication de l’Avis Général de Passation des Marchés : 14/02/2019 4. Période couverte par le Plan de Passation des Marchés : 12 mois – Janvier 2019 à Janvier 2020 5. Evaluation de risque par P-RAMS (Procurement Risk Assessment and Management System): MODERE II. TRAVAUX, FOURNITURES ET SERVICES NON INTELLECTUELS 1. Dispositions relatives aux seuils de revue préalable : Seuils requis pour les décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans le Règlement de passation de marchés – Juillet 2016 Page 1 of 7 Catégorie de Seuils pour la Marchés/Méthode de revue préalable Observations Passation des Marchés (US$ équivalent) tout autre contrat Fournitures et Equipements identifié dans le Plan 1 (Sélection competitive et 4,000,000 de Passation des directe) Marchés (PPM) Travaux, Contrats clé en main tout autre contrat et Contrats de Fourniture et identifié dans le Plan 2 Montage d’Installations  15,000,000 de Passation des (sélection compétitive et Marchés (PPM) directe) Travaux, Fournitures et La Banque examine et Services (autres que les approuve toute En dessous des services de justification d’entente seuils de revue consultants)/Entente Directe directe avec le PPM Seuils pour les méthodes de passation des marchés : Les seuils de passation des marchés se présentent comme suit au vu des conditions du marché : FOURNITURES ET PRESTATIONS NON TRAVAUX (US$ équivalent) INTELLECTULLES (US$ équivalent) AOI AON CF AOI AON CF ≥5.000.000 <5.000.000 <200.000 ≥1.000.000 <1.000.000 <100.000 2. Liste des marchés avec les méthodes de passation et les dates de mise en œuvre Travaux 1 2 3 4 5 6 7 8 9 Ref. Description Coût estimatif Méthode Pré Préféren Revue Date Commenta No. (US$) passatio qualificati ce de la prévue ires/ Fin n des on national Banque de de marchés (oui/non) e (à priori l’ouvert prestation (oui/non /à ure des s ) posterio offres ri) 1 RAS RAS RAS RAS RAS RAS RAS RAS RAS Page 2 of 7 Fournitures et Services non Intellectuels 1 2 3 4 5 6 7 8 9 Ref. Description Coût estimatif Méthode Pré Préfére Revue de la Date Commen No. (US$) passatio qualificati nce Banque (à prévue taires/ n des on nationa priori / à de Fin de marchés (oui/non) le posteriori) l’ouvert prestati (oui/no ure des ons n) offres Composante 2 Acquisition de Matériels et Post équipements A 28/03/1 28/05/ 1 DC Qualificatio Oui informatiques du 48 864 posteriori 9 19 n Ministère du Gabon Acquisition de Matériels et Post équipements A 28/03/1 28/05/ 2 DC Qualificatio Oui informatiques 24 431,50 posteriori 9 19 n Ministère de Sao Tome&Principe Acquisition de Matériels et Post équipements A 28/03/1 28/10/ 3 DC Qualificatio Oui informatiques de Posteriori 9 19 48 863 n Ministère de la RDC Acquisition de Matériels et Post équipements A 28/03/1 28/05/ 4 DC Qualificatio Oui informatiques de 48 863 Posteriori 9 19 n Ministère du Rwanda Acquisition de Matériels et Post équipements A 28/03/1 28/05/ 5 DC Qualificatio Oui informatiques du 48 863 posteriori 9 19 n Ministère du Burundi Acquisition de Matériels et Post équipements A 28/03/1 28/05/ 6 48 863 DC Qualificatio Oui informatiques du posteriori 9 19 n Ministère du Tchad Acquisition de Matériels et Post équipements A 28/04/1 28/06/ 7 48 863 DC Qualificatio Oui informatiques du posteriori 9 19 n Ministère de Centrafrique Acquisition de Matériels et Post équipements A 28/04/1 28/06/ 8 48 864 DC Qualificatio Oui informatiques du posteriori 9 19 n Ministère du Cameroun Page 3 of 7 Acquisition de Matériels et équipements Post A 28/04/1 28/06/ 9 informatiques de DC Qualificatio Oui 48 863 posteriori 9 19 Ministère n La Guinée Equatoriale Acquisition de Matériels et Post équipements A 28/04/1 28/06/ 10 DC Qualificatio Oui informatiques du 48 863 posteriori 9 19 n Ministère de L’Angola Acquisition de Matériels et Post équipements A 28/03/1 28/05/ 11 DC Qualificatio Oui informatiques du 48 863 posteriori 9 19 n Ministère du Congo Acquisition de Matériels et Post équipements A 28/03/1 28/05/ 12 24 431,50 DC Qualificatio Oui informatiques des posteriori 9 19 n parlementaire (REPARC) Composante 3 Acquisition logistiques 7th plate Post A 21/01/1 02/02/ 13 forme de Bujumbura 35 000 DC Qualificatio Oui posteriori 9 19 et réunion annuel du n REPARC Acquisition Post A 21/01/1 02/02/ 14 logistiques réunion 5000 DC Qualificatio Oui posteriori 9 19 annuel du REPARC n Acquisition Post A 30/06/1 30/12/ 15 logistiques 8th plate 40 000 DC Qualificatio Oui posteriori 9 19 forme de Kinshasa n Acquisition Post 30/03/1 A 9 30/12/ 16 logistiques atelier de 5000 DC Qualificatio Oui posteriori 19 formation n Acquisition Post logistiques atelier de A 30/04/1 15/05/ 17 16 667 DC Qualificatio Oui restitution de la posteriori 9 19 n stratégie régionale Acquisition Post logistiques atelier de A 30/04/1 15/05/ 18 16 667 DC Qualificatio Oui restitution stratégie posteriori 9 19 n régionale du pays Acquisition Post logistiques atelier de A 30/04/1 15/05/ 19 16 667 DC Qualificatio Oui restitution stratégie posteriori 9 19 n régionale du pays Acquisition Post logistiques atelier de A 30/04/1 30/05/ 20 16 667 DC Qualificatio Oui restitution stratégie posteriori 9 19 n régionale du pays Acquisition Post logistiques atelier de A 30/04/1 30/05/ 21 16 666 DC Qualificatio Oui restitution stratégie posteriori 9 19 n régionale du pays Page 4 of 7 Acquisition Post logistiques atelier de A 30/04/1 30/05/ 22 16 666 DC Qualificatio Oui restitution stratégie posteriori 9 19 n régionale du pays Composante 4 1er Atelier de Post formation au TCHAD A 30/03/1 03/04/ 23 5000 DC Qualificatio Oui posteriori 9 19 n 2ème Atelier de Post formation A 03/04/1 06/04/ 24 5000 DC Qualificatio Oui posteriori 9 19 n 3ème Atelier de Post formation A 06/04/1 10/05/ 25 5000 DC Qualificatio Oui posteriori 9 19 n 4ème Atelier de Post formation A 03/06/1 06/06/ 26 5000 DC Qualificatio Oui posteriori 9 19 n Composante 5 Acquisition du Post A 30/05/1 27 Logiciel TOMPRO 20 000 ED Qualificatio Oui N/A posteriori 9 n Entretien et Tout Maintenance des Post au A 30/03/1 28 SPLIT 750 DC Qualificatio Oui long posteriori 9 n du projet Entretien et Tout Maintenance des Post au A 30/03/1 long 29 équipement 800 DC Qualificatio Oui posteriori 9 du informatiques et n accessoires projet Abonnement Post Tout au A 11/02/1 30 connexion internet 3 531 DC Qualificatio Oui long du posteriori 9 n projet Mise en place d’un Post Tout au dispositif de A 30/03/1 31 990 DC Qualificatio Oui long du Maintenance posteriori 9 n projet Internet Abonnement Post Tout au A 30/03/1 32 Téléphone 3 000 DC Qualificatio Oui long du posteriori 9 n projet Mise en place d’un Post Tout au dispositif d’entretien A 20/02/1 33 8 250 DC Qualificatio Oui long du et de nettoyage des posteriori 9 n projet bureaux Mise en place d’un Toute la dispositif de Post A 30/03/1 durée 34 gardiennage des 10 700 DC Qualificatio Oui posteriori 9 du bureaux de l’Unité n Projet de Gestion Réhabilitation des Post A 30/03/1 30/05/2 35 locaux de l’Unité de 8 900 DC Qualificatio Oui posteriori 9 019 Gestion n Acquisition de Post Matériels et A 12/03/1 15/04/ 36 22 600 DC Qualificatio Oui équipements posteriori 9 2019 n informatiques de Page 5 of 7 l’Unité de Gestion du Projet Acquisition du Post mobilier de bureau A 12/03/1 15/04/ 37 4 800 DC Qualificatio Oui de l’Unité de posteriori 9 2019 n Gestion du Projet Coût total en US$ 186 921 1. relatives aux seuils de revue préalable des marchés : Décisions de sélection sujet à la revue préalable de la Banque comme indiqué dans le règlement de passation de marchés – Juillet 2016 Méthode de Seuils de revue à sélection priori Observations (US$ équivalent) Services de consultants : Firmes (Méthode Compétitive / tout autre contrat identifié dans le 1.  2,000,000 Consultations / PPM Ententes directes) Service de consultants Individuels tout autre contrat identifié dans le 2. (Méthode Compétitive /  400,000 PPM Consultations / Ententes directes) Entente directe (Firmes La Banque examine/approuve toute En dessous des seuils 3. de Consultants et justification d’entente directe avec de revue Consultants Individuel) le PPM 2. Liste des Consultations, avec les méthodes de sélection et le calendrier de mise œuvre 1 2 3 4 5 6 7 Date Revue de prévue Méthode la Banque de Commentai Ref. Coût estimatif de (à priori / Description des Missions soumissi res/ Fin de No. ($USD) sélectio à on des prestations n posteriori propositi ) ons Composante 5 Page 6 of 7 Recrutement d'un Toute la A 23/04/20 38 spécialiste DRM 75 000 CI durée du Posteriori 18 Projet Recrutement d'un junior 23/04/20 Toute la A 39 DRM 51 000 18 durée du CI Posteriori Projet Recrutement d’un 23/04/20 Toute la A 18 40 Responsable Administratif 75 000 durée du Posteriori et Financier CI Projet Recrutement d’un 23/04/20 Toute la 41 Spécialiste en passation 75 000 A Priori 18 durée du des marchés CI Projet Recrutement d'un 23/04/20 Toute la A 18 42 spécialiste en suivi 75 000 durée du Posteriori évaluation CI Projet Recrutement d’un Toute la A 23/04/20 43 comptable 67 500 durée du CI Posteriori 18 Projet Services de consultants chargés de l'audit externe Août 44 SMC A Priori 31/12//20 25 000 2019 1 Composante 3 Recrutement des experts consultants chargés de développer et d’élaborer A 45 200 000 SFQC 30/03/19 30/07/19 la stratégie régional et le Posteriori plan d’action de Sendai pour les 6 pays Coût total en US$ 443 500 JUSTIFICATIONS DES ENTENTES DIRECTES : Le logiciel Tompro avait déjà été acquis par la CEAAC à travers le projet PARCI et PDDA, cette acquisition dans le cadre du projet se fera par entente directe auprès du concepteur TOMATE à travers son représentant à Libreville qui se chargera du paramétrage et de la mise à disposition des clés supplémentaires pour une meilleure utilisation du logiciel. Page 7 of 7 PROCUREMENT Gabon : Gabon Statistical Development Project PLAN General Information Country: Gabon 2018-09-13 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P157473 GPN Date: Project Name: Gabon Statistical Development Project Loan / Credit No: IBRD / P4770, IBRD / 86990 COMMISSION NATIONALE DES TIPPEE Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GA-CN TIPPEE-84000-CW-RF Component 2: Build Technic Request for Quota Single Stage - One E 2019-07-0 Q / Travaux de raccordement IBRD / 86990 al Capacity and Modernize In Post Limited 40,000.00 37,589.07 Signed 2018-11-14 2019-02-25 2019-01-09 2019-03-19 tions nvelope 8 et pose de la fibre optique de frastructure la DGS GA-CN TIPPEE-108592-CW-R FQ / Travaux de mise en plac Component 2: Build Technic Request for Quota Single Stage - One E 2019-11-0 e de l'infrastructure réseau e IBRD / 86990 al Capacity and Modernize In Post Limited 190,000.00 125,429.99 Signed 2019-04-07 2019-04-08 2019-05-09 2019-05-18 tions nvelope 5 t électrique favorable au dépl frastructure oiement de la pose fibre opti que à la DGS GA-CN TIPPEE-46149-CW-RF Component 2: Build Technic B / Raccordement, équipeme Single Stage - One E 2018-12-2 IBRD / 86990 al Capacity and Modernize In Post Request for Bids Open - National 1,200,000.00 0.00 Canceled 2018-03-05 2018-03-10 2018-04-21 2018-05-21 2018-06-25 nts et mise en place de la co nvelope 2 frastructure nnexion par fibre optique GA-CN TIPPEE-129957-CW-R Component 2: Build Technic Request for Quota Single Stage - One E 2020-04-0 FQ / Travaux de d’aménage IBRD / 86990 al Capacity and Modernize In Post Limited 150,000.00 202,693.46 Signed 2019-09-08 2019-09-02 2019-10-11 2019-10-24 tions nvelope 8 ment des salles de réunion à frastructure la DGS GA-CN TIPPEE-157643-CW-R FQ / Travaux de réhabilitatio Component 2: Build Technic Request for Quota Single Stage - One E 2020-09-0 n du cablage du reseau infor IBRD / 86990 al Capacity and Modernize In Post Limited 70,000.00 26,348.72 Signed 2020-02-14 2020-06-15 2020-03-09 2020-08-07 tions nvelope 5 matique de la Direction Géné frastructure rale de l’Economie et de la P olitique Fiscale (DGPEF GA-CN TIPPEE-216398-CW-R Component 2: Build Technic FB / Travaux d’aménagemen Single Stage - One E 2021-11-1 IBRD / 86990 al Capacity and Modernize In Post Request for Bids Open - National 793,000.00 0.00 Canceled 2021-04-12 2021-04-17 2021-05-15 2021-05-29 2021-06-13 t du Bâtiment de Institut Nati nvelope 0 frastructure onale de la Statistique Request for Quota GA-CN TIPPEE-359515-CW-R Component 2: Build Technic Request for Quota Single Stage - One E tions - Small Work Pending Imp 2023-09-0 FQ / Travaux d'aménagemen IBRD / 86990 al Capacity and Modernize In Post Limited 1,030,000.00 0.00 2023-05-11 2023-06-09 tions nvelope s (Emergency) SP lementation 7 t des locaux de la DGS phase frastructure D -Competitive 1 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: National Stati GA-CN TIPPEE-83948-GO-RF stical System Institutional R Request for Quota Single Stage - One E Q / Acquisition du Logiciel ST IBRD / P4770 Post Limited 50,000.00 27,311.76 Signed 2018-11-06 2019-04-12 2018-12-25 2019-04-12 2019-06-23 eform and Project Managem tions nvelope ATA ent Capacity Building GA-CN TIPPEE-46205-GO-RF Component 3: National Stati Q / Acquisition d'imprimante stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 75,000.00 49,793.02 Signed 2018-11-04 2019-03-13 2018-12-30 2019-04-11 2019-06-28 et des consommables pour la eform and Project Managem tions nvelope DGS ent Capacity Building GA-CN TIPPEE-84006-GO-RF Component 3: National Stati Q / Fourniture d’un logiciel G stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 30,000.00 28,800.00 Completed 2018-11-13 2018-12-26 2019-01-08 2018-11-29 2019-07-07 2019-01-30 AMS pour la Direction Généra eform and Project Managem tions nvelope le de la Prospective ent Capacity Building GA-CN TIPPEE-84001-GO-RF Component 3: National Stati Q / Acquisition équipements stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 80,000.00 91,505.77 Signed 2018-12-12 2019-03-20 2019-02-06 2019-03-14 2019-08-05 de laboratoire médical pour l eform and Project Managem tions nvelope e terrain ent Capacity Building GA-CN TIPPEE-84011-GO-RF Component 3: National Stati Q / Acquisition de Police d’As stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 60,000.00 84,907.80 Signed 2018-12-08 2019-10-17 2019-02-02 2019-11-21 2019-08-01 surance pour le personnel de eform and Project Managem tions nvelope terrain ent Capacity Building GA-CN TIPPEE-84024-GO-RF Component 3: National Stati Q / Fourniture de Communica stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 8,000.00 7,290.56 Signed 2018-11-21 2018-11-28 2019-01-16 2018-12-17 2019-07-15 tion et Internet pour l'UCP PS eform and Project Managem tions nvelope TAT ent Capacity Building GA-CN TIPPEE-84027-GO-RF Component 1: Improved Dat Request for Quota Single Stage - One E Q / Fournitures de Bureau po IBRD / 86990 a Collection, Statistical Prod Post Limited 80,000.00 74,772.07 Signed 2019-07-20 2019-04-12 2019-09-14 2019-04-11 2020-03-12 tions nvelope ur l’ONS uction, and Dissemination GA-CN TIPPEE-84022-GO-RF Component 1: Improved Dat Request for Quota Single Stage - One E Q / Acquisition du Logiciel Ar IBRD / 86990 a Collection, Statistical Prod Post Limited 75,000.00 64,632.93 Signed 2018-11-23 2019-04-12 2019-01-18 2019-07-10 2019-07-17 tions nvelope cGIS DESKTOP uction, and Dissemination Component 3: National Stati GA-CN TIPPEE-84007-GO-RF stical System Institutional R Request for Quota Single Stage - One E Q / Fourniture de carburant p IBRD / 86990 Post Limited 13,000.00 12,992.63 Signed 2018-11-21 2018-11-28 2019-01-16 2018-12-07 2019-07-15 eform and Project Managem tions nvelope our l'UCP PSTAT ent Capacity Building GA-CN TIPPEE-84021-GO-RF Component 3: National Stati Q / Acquisition d'Equipement stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 35,000.00 42,525.06 Signed 2019-12-04 2018-12-20 2020-01-29 2018-12-20 2020-07-27 (matériel Informatique et aut eform and Project Managem tions nvelope res) ent Capacity Building Component 3: National Stati GA-CN TIPPEE-46220-GO-RF stical System Institutional R Request for Quota Single Stage - One E Q / Acquisition de Carburant IBRD / 86990 Post Limited 26,000.00 17,304.50 Signed 2018-11-27 2019-01-14 2019-01-22 2019-02-02 2019-07-21 eform and Project Managem tions nvelope pour la DGS. ent Capacity Building Page 1 GA-CN TIPPEE-46176-GO-RF Component 3: National Stati B / Acquisition d'Equipement stical System Institutional R Single Stage - One E IBRD / 86990 Post Request for Bids Open - National 300,000.00 392,574.50 Signed 2018-11-22 2019-04-12 2018-11-27 2019-01-08 2019-04-30 2019-02-07 2019-06-26 2019-03-14 2019-07-01 2019-09-10 informatique (ordinateurs, po eform and Project Managem nvelope rtables). ent Capacity Building GA-CN TIPPEE-46215-GO-RF Component 3: National Stati Q / Acquisition d'Equipement stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 65,000.00 13,395.89 Signed 2019-01-12 2019-04-12 2019-03-09 2019-04-08 2019-09-05 (matériel de bureau) du cent eform and Project Managem tions nvelope re de formation continu de D ent Capacity Building GS. Component 3: National Stati GA-CN TIPPEE-100905-GO-R stical System Institutional R Request for Quota Single Stage - One E FQ / Achat 10 Véhicules Type IBRD / P4770 Post Limited 305,000.00 461,413.62 Signed 2016-10-17 2019-02-24 2016-12-12 2016-12-02 2017-06-10 eform and Project Managem tions nvelope pick up double cabines 4X4 ent Capacity Building Component 3: National Stati GA-CN TIPPEE-100832-GO-R stical System Institutional R Request for Quota Single Stage - One E FQ / Achat 3 Véhicules Type IBRD / P4770 Post Limited 110,000.00 0.00 Canceled 2016-10-17 2016-12-12 2017-06-10 eform and Project Managem tions nvelope 4x4 station wagon ent Capacity Building GA-CN TIPPEE-100856-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Reprographie et Impress IBRD / P4770 a Collection, Statistical Prod Post Limited 30,000.00 44,452.04 Signed 2016-12-20 2019-04-01 2017-02-14 2018-08-09 2017-08-13 tions nvelope ion des outils de collecte/EP uction, and Dissemination Component 3: National Stati GA-CN TIPPEE-100847-GO-R stical System Institutional R Request for Quota Single Stage - One E IBRD / P4770 Post Limited 85,000.00 66,442.31 Signed 2016-10-22 2019-02-24 2016-12-17 2017-01-16 2017-06-15 FQ / Réparation de Véhicules eform and Project Managem tions nvelope ent Capacity Building Component 3: National Stati GA-CN TIPPEE-100862-GO-R stical System Institutional R Request for Quota Single Stage - One E IBRD / P4770 Post Limited 15,000.00 16,721.87 Signed 2016-11-10 2019-02-24 2017-01-05 2019-02-28 2017-07-04 FQ / Acquisition de Pneu eform and Project Managem tions nvelope ent Capacity Building GA-CN TIPPEE-100924-GO-R Component 1: Improved Dat FQ / Fournitures d'équipeme Request for Quota Single Stage - One E IBRD / P4770 a Collection, Statistical Prod Post Limited 55,000.00 176,540.75 Signed 2019-02-19 2019-02-25 2019-03-14 2019-04-08 2019-09-10 nts informatiques pour l'annu tions nvelope uction, and Dissemination aire statistique de l'éducatio n Component 3: National Stati GA-CN TIPPEE-46175-GO-RF stical System Institutional R Request for Quota Single Stage - One E Q / Acquisition de Quatre (4) IBRD / 86990 Post Limited 40,000.00 0.00 Canceled 2018-11-27 2019-01-22 2019-07-21 eform and Project Managem tions nvelope Serveurs ent Capacity Building GA-CN TIPPEE-100914-GO-R Component 3: National Stati FQ / Acquisition et installatio stical System Institutional R Request for Quota Single Stage - One E IBRD / P4770 Post Limited 70,000.00 0.00 Canceled 2017-03-08 2017-05-03 2017-10-30 n de 15 (Quinze) Couvres Be eform and Project Managem tions nvelope nne type Full box pour Mitshi ent Capacity Building bishi L200 Component 3: National Stati GA-CN TIPPEE-100887-GO-R stical System Institutional R Request for Quota Single Stage - One E FQ / Achat des GPS pour les t IBRD / P4770 Post Limited 20,000.00 0.00 Canceled 2016-11-20 2017-01-15 2017-07-14 eform and Project Managem tions nvelope ravaux de l’EGEP et de l’EDS ent Capacity Building GA-CN TIPPEE-100915-GO-R Component 3: National Stati FQ / Acquisition d’une police stical System Institutional R Request for Quota Single Stage - One E IBRD / P4770 Post Limited 50,000.00 0.00 Canceled 2017-03-05 2017-04-30 2017-10-27 d’assurance pour le personn eform and Project Managem tions nvelope el de terrain ent Capacity Building Component 3: National Stati GA-CN TIPPEE-100901-GO-R stical System Institutional R Request for Quota Single Stage - One E IBRD / P4770 Post Limited 50,000.00 0.00 Canceled 2017-04-10 2017-06-05 2017-12-02 FQ / Acquisition de Carburant eform and Project Managem tions nvelope ent Capacity Building Component 3: National Stati GA-CN TIPPEE-100841-GO-R stical System Institutional R Request for Quota Single Stage - One E FQ / Acquisition de Police d’A IBRD / P4770 Post Limited 25,000.00 0.00 Canceled 2016-11-20 2017-01-15 2017-07-14 eform and Project Managem tions nvelope ssurance Pour les Véhicules ent Capacity Building GA-CN TIPPEE-46194-GO-RF Component 3: National Stati Q / Acquisition d'Equipement stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 90,000.00 0.00 Canceled 2018-11-04 2018-12-30 2019-06-28 informatique et fournitures d eform and Project Managem tions nvelope e bureau pour la DGS ent Capacity Building Component 3: National Stati GA-CN TIPPEE-84018-GO-RF stical System Institutional R Request for Quota Single Stage - One E Q / Entretien et Maintenance IBRD / 86990 Post Limited 4,000.00 0.00 Canceled 2018-11-27 2019-01-22 2019-07-21 eform and Project Managem tions nvelope des SPLIT (CNTIPPEE) ent Capacity Building GA-CN TIPPEE-46187-GO-RF Component 3: National Stati Q / Acquisition de quatre (4) stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 20,000.00 0.00 Canceled 2018-11-20 2019-01-15 2019-07-14 Onduleurs petites capacité p eform and Project Managem tions nvelope our la DGS ent Capacity Building GA-CN TIPPEE-100838-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition de cinquante IBRD / P4770 a Collection, Statistical Prod Post Limited 99,000.00 90,758.38 Signed 2016-11-19 2017-07-27 2017-01-14 2017-09-21 2017-07-13 tions nvelope quatre (54) ordinateurs pour uction, and Dissemination la DGS Component 3: National Stati GA-CN TIPPEE-108571-GO-DI stical System Institutional R R / Réparation et entretien v IBRD / P4770 Post Direct Selection Direct 60,000.00 36,433.96 Signed 2019-05-05 2019-05-12 2019-05-10 2019-04-26 2019-05-14 2019-05-14 2019-11-10 eform and Project Managem éhicules de la DGS ent Capacity Building Component 3: National Stati GA-CN TIPPEE-120860-GO-DI stical System Institutional R R / Entretien des véhicules L IBRD / P4770 Post Direct Selection Direct 18,000.00 5,938.93 Signed 2019-06-25 2019-07-03 2019-06-26 2019-05-13 2019-06-30 2019-05-15 2019-12-27 eform and Project Managem OT3 ent Capacity Building GA-CN TIPPEE-84013-GO-RF Component 3: National Stati B / Acquisition des mobiliers stical System Institutional R Single Stage - One E IBRD / 86990 Post Request for Bids Open - National 100,000.00 0.00 Canceled 2018-11-08 2018-11-13 2018-12-25 2019-01-24 2019-02-28 2019-08-27 et équipements pour la Salle eform and Project Managem nvelope de Réunion et de la salle de F ent Capacity Building ormation de la DGS GA-CN TIPPEE-125002-GO-R Component 1: Improved Dat FQ / Acquisition des gilets po Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 50,000.00 41,624.25 Signed 2019-07-30 2019-08-22 2019-08-21 2019-09-10 2019-09-20 ur le personnel de collecte de tions nvelope uction, and Dissemination s données du dénombrement principal du RGA Component 3: National Stati GA-CN TIPPEE-108865-GO-R stical System Institutional R Request for Quota Single Stage - One E FQ / Acquisition d'véhicule po IBRD / 86990 Post Limited 45,000.00 34,841.09 Completed 2019-07-28 2019-08-30 2019-08-23 2019-09-11 2019-09-22 2019-10-01 eform and Project Managem tions nvelope ur l'UCP STAT ent Capacity Building Page 2 GA-CN TIPPEE-130252-GO-R FQ / Impression des docume Component 1: Improved Dat Request for Quota Single Stage - One E nts techniques pour la collect IBRD / 86990 a Collection, Statistical Prod Post Limited 150,000.00 75,974.72 Signed 2019-09-08 2019-09-04 2019-11-03 2019-09-18 2020-05-01 tions nvelope e des données lors du dénom uction, and Dissemination brement principal du RGA (2 lots) GA-CN TIPPEE-135212-GO-DI Component 3: National Stati R / Acquisition du Logiciel Evi stical System Institutional R IBRD / 86990 Post Direct Selection Direct 22,000.00 0.00 Canceled 2019-10-11 2019-10-12 2019-10-16 2019-10-23 2020-04-20 ews Enterprise pour la DGPE eform and Project Managem F ent Capacity Building Component 3: National Stati GA-CN TIPPEE-84029-GO-RF stical System Institutional R Request for Quota Single Stage - One E Q / Acquisition du Logiciel R- IBRD / 86990 Post Limited 25,000.00 0.00 Canceled 2018-11-17 2019-01-12 2019-07-11 eform and Project Managem tions nvelope STUDIO ent Capacity Building GA-CN TIPPEE-138958-GO-R FQ / Impression des rapports Component 1: Improved Dat Request for Quota Single Stage - One E d’analyse portant sur le profil IBRD / 86990 a Collection, Statistical Prod Post Limited 162,000.00 47,328.09 Signed 2019-10-10 2019-11-18 2019-10-27 2019-11-20 2019-12-26 tions nvelope de pauvreté et de l’Annuaire uction, and Dissemination Statistique du Gabon GA-CN TIPPEE-129917-GO-R FQ / Fourniture forfait interne Component 1: Improved Dat Request for Quota Single Stage - One E t et communication pour le p IBRD / 86990 a Collection, Statistical Prod Post Limited 50,000.00 0.00 Canceled 2019-10-23 2019-11-09 2020-05-07 tions nvelope ersonnel de terrain lors de la uction, and Dissemination phase principale du RGA GA-CN TIPPEE-157639-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition des mobiliers IBRD / 86990 a Collection, Statistical Prod Post Limited 80,000.00 142,295.57 Signed 2020-02-08 2020-04-08 2020-02-27 2020-08-12 2020-04-27 tions nvelope de bureau pour de la DGS uction, and Dissemination GA-CN TIPPEE-157644-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition du Logiciel E IBRD / 86990 a Collection, Statistical Prod Post Limited 70,000.00 66,154.98 Completed 2020-02-07 2020-02-18 2020-02-20 2020-07-04 2020-04-20 2020-07-30 tions nvelope views Enterprise pour la DGP uction, and Dissemination EF GA-CN TIPPEE-157645-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition d’équipemen IBRD / 86990 a Collection, Statistical Prod Post Limited 60,000.00 112,857.85 Signed 2020-02-13 2020-02-18 2020-03-04 2020-05-23 2020-08-31 tions nvelope ts informatiques au RGE uction, and Dissemination GA-CN TIPPEE-157647-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition de trois (3) v IBRD / 86990 a Collection, Statistical Prod Post Limited 50,000.00 78,937.04 Completed 2020-02-14 2020-02-25 2020-03-06 2020-09-02 2020-04-05 2020-12-08 tions nvelope éhicules de type berline uction, and Dissemination GA-CN TIPPEE-157648-GO-R FQ / Acquisition de materiel i Component 1: Improved Dat Request for Quota Single Stage - One E nformatique de la direction g IBRD / 86990 a Collection, Statistical Prod Post Limited 50,000.00 217,487.46 Signed 2020-02-10 2020-06-11 2020-02-22 2020-08-07 2020-03-23 tions nvelope enerale de l’économie et de l uction, and Dissemination a politique fiscale (DGPEF) GA-CN TIPPEE-157646-GO-R FQ / Acquisition des consom Component 1: Improved Dat mbles pour le Recensement Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 80,000.00 14,563.74 Completed 2020-02-14 2020-02-18 2020-03-06 2020-05-12 2020-09-02 2020-06-27 Général de l’Agriculture et sy tions nvelope uction, and Dissemination steme permanent integre de s statistiques agricoles (RGA- SPISA) GA-CN TIPPEE-163282-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition des cinquant IBRD / 86990 a Collection, Statistical Prod Post Limited 22,000.00 0.00 Canceled 2020-03-13 2020-03-29 2020-04-28 tions nvelope e (50) tablettes uction, and Dissemination GA-CN TIPPEE-163243-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition des consom IBRD / 86990 a Collection, Statistical Prod Post Limited 3,000.00 0.00 Canceled 2020-03-13 2020-03-28 2020-04-27 tions nvelope mables et fournitures de bur uction, and Dissemination eau pour le RGE GA-CN TIPPEE-100911-GO-R Component 3: National Stati FQ / Acquisition de Fournitur stical System Institutional R Request for Quota Single Stage - One E IBRD / P4770 Post Limited 30,000.00 0.00 Canceled 2017-01-04 2017-03-01 2017-08-28 e pour la Collecte de Donnée eform and Project Managem tions nvelope /EGEPII ent Capacity Building GA-CN TIPPEE-166612-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition de kits médic IBRD / 86990 a Collection, Statistical Prod Post Limited 50,000.00 74,327.27 Signed 2020-03-31 2020-06-11 2020-04-12 2020-07-09 2020-10-09 tions nvelope aux pour VIH uction, and Dissemination GA-CN TIPPEE-175653-GO-DI Component 1: Improved Dat R / Fourniture de carburant à IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 18,000.00 0.00 Canceled 2020-06-01 2020-06-02 2020-06-06 2020-06-01 2020-06-07 2020-12-04 la Direction Générale de la St uction, and Dissemination atistique GA-CN TIPPEE-175651-GO-DI Component 1: Improved Dat R / Entretien et répartion des IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 100,000.00 0.00 Canceled 2020-05-29 2020-06-03 2020-06-04 2020-12-01 véhicules RGA et EDSG3 uction, and Dissemination Component 3: National Stati GA-CN TIPPEE-175657-GO-DI stical System Institutional R R / Fourniture d’internet à l’U IBRD / 86990 Post Direct Selection Direct 3,000.00 2,937.83 Signed 2020-06-01 2020-06-02 2020-06-06 2020-06-03 2020-06-09 2020-06-06 2020-07-09 eform and Project Managem CP ent Capacity Building GA-CN TIPPEE-179565-GO-R Component 1: Improved Dat FQ / Achat de six (06) pick-up Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 215,000.00 237,016.69 Completed 2020-06-16 2020-06-22 2020-07-14 2020-07-21 2020-10-12 2020-08-29 supplémentaires pour la pour tions nvelope uction, and Dissemination suite de l 'EDSGIII GA-CN TIPPEE-181525-GO-R Component 3: National Stati FQ / Fourniture de bureau, co stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 15,000.00 14,808.42 Signed 2020-07-05 2021-08-12 2020-08-04 2021-09-21 2020-10-03 nsommable et materiel infor eform and Project Managem tions nvelope matique à l’UCP ent Capacity Building GA-CN TIPPEE-175655-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Fourniture de crédit de c IBRD / 86990 a Collection, Statistical Prod Post Limited 18,000.00 0.00 Canceled 2020-11-04 2020-11-18 2021-11-13 tions nvelope ommunication à la DGS uction, and Dissemination GA-CN TIPPEE-84026-GO-RF Component 1: Improved Dat Request for Quota Single Stage - One E Q / Fourniture d’un server d’ IBRD / 86990 a Collection, Statistical Prod Post Limited 20,000.00 17,383.49 Signed 2021-01-25 2021-01-22 2021-02-16 2021-06-15 2021-08-15 tions nvelope Hébergement et maintenanc uction, and Dissemination e du site WEB GA-CN TIPPEE-216384-GO-R Component 1: Improved Dat FQ / Acquisition du Matériel d Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 89,000.00 75,581.28 Signed 2021-02-07 2021-03-10 2021-02-24 2021-05-06 2021-04-25 e protection contre la COVID- tions nvelope uction, and Dissemination 19 (Masques, gels hydroalco oliques, etc.) Page 3 GA-CN TIPPEE-218076-GO-R FQ / Acquisition de quatre (0 Component 1: Improved Dat 4) véhicules de type pick-up Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 141,400.00 143,852.43 Signed 2021-02-11 2021-02-23 2021-02-22 2021-03-13 2021-03-24 4x4 double cabine pour la de tions nvelope uction, and Dissemination uxième phase de la collecte des données dans le cadre d e l'EDSG3 GA-CN TIPPEE-223119-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition d’un FortiGet IBRD / 86990 a Collection, Statistical Prod Post Limited 80,000.00 8,327.00 Signed 2021-03-17 2021-03-25 2021-04-07 2021-06-08 2021-07-06 tions nvelope pour la DGS uction, and Dissemination GA-CN TIPPEE-216424-GO-R Component 1: Improved Dat FQ / Acquérir le matériel infor Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 69,000.00 0.00 Canceled 2021-02-13 2021-03-07 2021-09-03 matique de collecte (Tablette tions nvelope uction, and Dissemination s, Ordinateurs portables et a ccessoires) GA-CN TIPPEE-239425-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Acquisition de sept (7) v IBRD / 86990 a Collection, Statistical Prod Post Limited 300,000.00 338,264.64 Signed 2021-06-19 2021-06-15 2021-07-08 2021-06-25 2021-09-06 tions nvelope éhicules de type 4x4 pour la uction, and Dissemination DGS GA-CN TIPPEE-242785-GO-DI Component 1: Improved Dat R / Acquisition de deux (2) vé IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 72,000.00 70,521.54 Completed 2021-07-13 2021-07-16 2021-07-14 2021-07-16 2021-07-17 2021-07-21 2021-08-16 2021-07-29 hicules de type 4x4 pour la D uction, and Dissemination GS GA-CN TIPPEE-248561-GO-DI Component 1: Improved Dat R / Acquisition du logiciel Pro IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 16,000.00 13,108.83 Completed 2021-08-31 2021-09-03 2021-09-01 2021-09-09 2021-09-03 2021-11-26 2021-10-03 2022-03-05 gress pour la DCN uction, and Dissemination GA-CN TIPPEE-248541-GO-DI Component 1: Improved Dat R / Fourniture de carburant à IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 18,000.00 17,607.10 Signed 2021-08-30 2021-09-01 2021-09-04 2021-09-08 2021-09-06 2021-10-01 2021-12-05 la DGS uction, and Dissemination GA-CN TIPPEE-84019-GO-RF Component 2: Build Technic Q / Acquisition d'un groupe él Request for Quota Single Stage - One E IBRD / 86990 al Capacity and Modernize In Post Limited 20,000.00 0.00 Canceled 2022-02-20 2022-04-17 2022-10-14 ectrogène (y compris carbura tions nvelope frastructure nt et maintenance) pour l'ins titut GA-CN TIPPEE-248552-GO-R Component 1: Improved Dat FB / Impression de l’annuaire Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 80,000.00 0.00 Canceled 2022-02-23 2022-04-20 2022-10-17 statistique du secteur de l’éd tions nvelope uction, and Dissemination ucation et de la formation 20 18-19 GA-CN TIPPEE-258774-GO-R Component 1: Improved Dat FQ / IMPRESSION DES RAPPO Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 3,700.00 3,534.81 Signed 2021-10-21 2021-11-30 2021-11-05 2021-12-04 2021-12-20 RTS D’ANALYSE DE LA PREMI tions nvelope uction, and Dissemination ERE PHASE DU RGA-SPISA GA-CN TIPPEE-248555-GO-R Component 1: Improved Dat FQ / Fourniture et production Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 24,000.00 5,037.24 Signed 2021-09-02 2022-02-11 2021-09-15 2022-03-08 2021-10-15 de supports de communicati tions nvelope uction, and Dissemination on et flocage des véhicules GA-CN TIPPEE-291104-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Achat des tablettes pour IBRD / 86990 a Collection, Statistical Prod Post Limited 223,000.00 220,930.32 Signed 2022-04-30 2022-04-30 2022-06-25 2022-05-17 2022-12-22 tions nvelope le RGEF2 et EGEP3 uction, and Dissemination GA-CN TIPPEE-291105-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E Under Imple FQ / Achat des équipement in IBRD / 86990 a Collection, Statistical Prod Post Limited 107,000.00 0.00 2022-04-30 2022-04-29 2022-06-25 2022-12-22 tions nvelope mentation formatiques pour le RGEF2 uction, and Dissemination GA-CN TIPPEE-294043-GO-DI Component 1: Improved Dat R / Impression des rapports d IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 15,500.00 14,691.89 Signed 2022-05-11 2022-05-15 2022-05-12 2022-05-17 2022-05-15 2022-05-18 2022-06-14 ’analyse de la première phas uction, and Dissemination e du RGA-SPISA phase 2 GA-CN TIPPEE-308236-GO-DI Component 1: Improved Dat Direct - Internation Under Imple R / Renouvèlement des licen IBRD / 86990 a Collection, Statistical Prod Post Direct Selection 76,000.00 0.00 2022-08-10 2022-08-23 2022-08-15 2022-08-23 2022-08-19 2023-02-15 al mentation ces SAP Analytics et GAMS et uction, and Dissemination Maintenance GA-CN TIPPEE-312871-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E Under Imple FQ / Achat de matériel d’anal IBRD / 86990 a Collection, Statistical Prod Post Limited 145,000.00 0.00 2022-08-31 2022-09-10 2023-03-09 tions nvelope mentation yse du laboratoire pour L’ED uction, and Dissemination SG III GA-CN TIPPEE-316807-GO-R Component 1: Improved Dat FQ / Câblages réseaux inform Request for Quota Single Stage - One E Under Imple IBRD / 86990 a Collection, Statistical Prod Post Limited 5,000.00 0.00 2022-09-23 2022-10-24 2023-04-22 atique et les prises ondulées tions nvelope mentation uction, and Dissemination pour le Laboratoire National GA-CN TIPPEE-334357-GO-R Component 1: Improved Dat FQ / Achat de douze (12) véh Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 600,000.00 0.00 Signed 2023-01-26 2023-03-10 2023-02-23 2023-03-25 icules land cruiser de type Pi tions nvelope uction, and Dissemination ck up 4X4 pour le RGPL 2023 GA-CN TIPPEE-337386-GO-R Component 1: Improved Dat Request for Quota Single Stage - One E Pending Impl FQ / Acquisition de six (6) Pir IBRD / 86990 a Collection, Statistical Prod Post Limited 140,000.00 0.00 2023-01-26 2023-02-23 2023-03-25 tions nvelope ementation ogues motorisées uction, and Dissemination GA-CN TIPPEE-216391-GO-R Component 2: Build Technic Request for Quota Single Stage - One E Pending Impl FQ / Acquisition des équipem IBRD / 86990 al Capacity and Modernize In Post Limited 34,300.00 0.00 2021-12-26 2022-02-20 2022-08-19 tions nvelope ementation ents informatiques pour la D frastructure GEPF GA-CN TIPPEE-359513-GO-R Component 2: Build Technic Request for Quota Single Stage - One E Pending Impl FQ / Installation et réhabilitat IBRD / 86990 al Capacity and Modernize In Post Limited 250,000.00 0.00 2023-05-10 2023-05-22 2023-09-19 tions nvelope ementation ion des ascenseurs DGS et A frastructure NBG GA-CN TIPPEE-359514-GO-R Component 2: Build Technic FQ / Acquisition des équipem Request for Quota Single Stage - One E Pending Impl IBRD / 86990 al Capacity and Modernize In Post Limited 600,000.00 0.00 2023-05-23 2023-06-19 2023-08-18 ents informatiques, mobiliers tions nvelope ementation frastructure et consommables de bureau pour la DGS NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: National Stati GA-CN TIPPEE-46284-NC-RF stical System Institutional R Request for Quota Single Stage - One E Q / Acquisition ADSL (CNTIPP IBRD / P4770 Post Limited 8,000.00 0.00 Canceled 2018-02-17 2018-04-14 2018-10-11 eform and Project Managem tions nvelope EE PPA). ent Capacity Building Page 4 GA-CN TIPPEE-46163-NC-DIR Component 1: Improved Dat / Acquisition de la License SP IBRD / P4770 a Collection, Statistical Prod Post Direct Selection Direct 40,000.00 0.00 Canceled 2018-02-26 2018-03-03 2018-04-07 2018-10-04 SS uction, and Dissemination Component 3: National Stati GA-CN TIPPEE-46160-NC-DIR stical System Institutional R / Acquisition du Logiciel TOM IBRD / P4770 Post Direct Selection Direct 20,000.00 0.00 Canceled 2018-11-22 2018-11-27 2019-01-01 2019-06-30 eform and Project Managem PRO ent Capacity Building Component 3: National Stati GA-CN TIPPEE-46162-NC-DIR stical System Institutional R / Acquisition du Logiciel STAT IBRD / P4770 Post Direct Selection Direct 30,000.00 0.00 Canceled 2018-02-12 2018-02-17 2018-03-24 2018-09-20 eform and Project Managem A ent Capacity Building Component 3: National Stati GA-CN TIPPEE-46288-NC-RF stical System Institutional R Request for Quota Single Stage - One E Q / Réparation et entretien v IBRD / 86990 Post Limited 100,000.00 0.00 Canceled 2019-01-06 2019-03-03 2019-08-30 eform and Project Managem tions nvelope éhicules du Projet. ent Capacity Building Component 3: National Stati GA-CN TIPPEE-126202-NC-R stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 3,400.00 3,802.22 Signed 2019-08-20 2019-09-02 2019-09-05 2019-09-10 2020-03-03 FQ / Entretien des SPLIT eform and Project Managem tions nvelope ent Capacity Building GA-CN TIPPEE-144838-NC-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Location des véhicules p IBRD / 86990 a Collection, Statistical Prod Post Limited 520,000.00 431,680.02 Signed 2019-11-10 2019-11-08 2019-11-19 2019-11-19 2020-05-17 tions nvelope our les activités de terrain E uction, and Dissemination DSG GA-CN TIPPEE-144840-NC-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Location des véhicules p IBRD / 86990 a Collection, Statistical Prod Post Limited 174,000.00 148,102.19 Signed 2019-11-10 2019-11-08 2019-11-19 2019-11-19 2020-05-17 tions nvelope our les activités de terrain du uction, and Dissemination RGA GA-CN TIPPEE-144842-NC-R Component 1: Improved Dat Request for Quota Single Stage - One E FQ / Réparation des véhicule IBRD / 86990 a Collection, Statistical Prod Post Limited 80,000.00 0.00 Canceled 2019-11-13 2019-11-22 2020-05-20 tions nvelope s pour le terrain uction, and Dissemination GA-CN TIPPEE-163237-NC-DI Component 1: Improved Dat R / Location de dix-neuf (19) IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 150,000.00 74,488.90 Signed 2020-03-11 2020-03-10 2020-03-16 2020-03-10 2020-03-20 2020-03-26 2020-09-16 véhicules de types Pick-Up - uction, and Dissemination RGA - (4 allotissements) GA-CN TIPPEE-157668-NC-DI Component 1: Improved Dat R / Réparation des véhicules IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 14,000.00 0.00 Canceled 2020-02-10 2020-02-10 2020-02-13 2020-03-14 de terrain de trois (3) véhicul uction, and Dissemination es accidentés GA-CN TIPPEE-163287-NC-DI Component 1: Improved Dat R / Location de onze (11) véh IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 170,000.00 138,685.78 Signed 2020-03-13 2020-03-10 2020-03-15 2020-03-10 2020-03-22 2020-03-13 2020-09-18 icules de type 4X4 tout terrai uction, and Dissemination n (7-8 Places) - EDSG3 - (4 all otissements) GA-CN TIPPEE-181521-NC-R Component 1: Improved Dat FQ / Nettoyage et de désinfe Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 1,800.00 2,354.34 Signed 2019-07-02 2020-07-30 2019-07-14 2020-08-18 2019-08-13 ction des salles de réunion et tions nvelope uction, and Dissemination bureaux de la Direction Géné rale de la Statistique GA-CN TIPPEE-189420-NC-R Component 1: Improved Dat FQ / Location des véhicules p Request for Quota Single Stage - One E IBRD / 86990 a Collection, Statistical Prod Post Limited 50,000.00 160,742.77 Signed 2020-08-25 2019-11-08 2020-09-06 2019-11-19 2020-11-05 our la reprise phase de déno tions nvelope uction, and Dissemination mbrement du RGA GA-CN TIPPEE-216429-NC-R Component 3: National Stati FQ / Police d’assurance mala stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Open - National 12,000.00 4,012.75 Signed 2021-02-13 2021-03-06 2021-04-29 2021-12-31 die pour le personnel de l’UC eform and Project Managem tions nvelope P ent Capacity Building Component 3: National Stati GA-CN TIPPEE-216345-NC-R stical System Institutional R Request for Quota Single Stage - One E FQ / Acquisition des pneus po IBRD / 86990 Post Limited 10,000.00 10,747.03 Signed 2021-02-11 2021-02-16 2021-02-23 2021-03-05 2021-03-25 eform and Project Managem tions nvelope ur les véhicules de l'UCP ent Capacity Building GA-CN TIPPEE-251903-NC-R Component 3: National Stati FQ / Conception et productio stical System Institutional R Request for Quota Single Stage - One E IBRD / 86990 Post Limited 75,000.00 30,033.90 Signed 2021-09-23 2021-10-22 2021-10-03 2021-10-21 2021-12-02 n du court film vidéo de publi eform and Project Managem tions nvelope cité et autres outils de comm ent Capacity Building unication pour le RGE Component 3: National Stati GA-CN TIPPEE-273348-NC-DI stical System Institutional R R / Fourniture d’une police d’ IBRD / 86990 Post Direct Selection Direct 18,000.00 9,503.50 Signed 2022-02-07 2022-02-01 2022-02-12 2022-02-01 2022-02-21 2022-03-01 2023-02-16 eform and Project Managem assurance santé pour l’UCP ent Capacity Building GA-CN TIPPEE-239427-NC-DI Component 3: National Stati R / Acquisition, paramétrage stical System Institutional R Pending Impl et formation au progiciel de IBRD / 86990 Post Direct Selection Direct 20,000.00 0.00 2022-09-01 2022-09-03 2022-09-08 2022-11-07 eform and Project Managem ementation gestion financière, des marc ent Capacity Building hes et de suivi-évaluation. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GA-CN TIPPEE-78251-CS-QC Component 3: National Stati BS / RECRUTEMENT D'UN CA stical System Institutional R Quality And Cost- Open - Internationa IBRD / 86990 Post 250,000.00 283,487.40 Signed 2018-09-21 2018-10-12 2018-10-22 2018-11-25 2019-01-14 2018-12-23 2019-01-22 2019-03-02 2019-02-26 2019-03-08 2019-04-02 2019-03-25 2020-04-01 BINET POUR LA REFORME DU eform and Project Managem Based Selection l DISPOSITIF DU SUIVI CONJON ent Capacity Building CTUREL. GA-CN TIPPEE-78256-CS-QC Component 3: National Stati BS / RECRUTEMENT D'UN CA stical System Institutional R Quality And Cost- Open - Internationa IBRD / 86990 Post 250,000.00 236,914.47 Signed 2018-10-05 2018-10-26 2018-10-22 2018-12-09 2019-01-14 2019-01-06 2019-02-05 2019-03-02 2019-03-12 2019-03-25 2019-04-16 2019-03-25 2020-04-15 BINET EN MODELISATION MA eform and Project Managem Based Selection l CROECONOMIQUE ent Capacity Building GA-CN TIPPEE-78264-CS-QC Component 3: National Stati BS / RECRUTEMENT D'UN CA stical System Institutional R Quality And Cost- Open - Internationa BINET POUR LA CONCEPTION IBRD / 86990 Post 250,000.00 318,924.54 Signed 2018-10-01 2018-10-22 2018-10-22 2018-12-05 2019-01-14 2019-01-02 2019-03-02 2019-02-01 2019-02-08 2019-03-08 2019-04-03 2019-04-12 2019-03-25 2020-04-11 eform and Project Managem Based Selection l ET LE DEVELOPPEMENT D'UN ent Capacity Building SYSTEME D'INFORMATION GA-CN TIPPEE-83941-CS-QC Component 3: National Stati BS / Recrutement d'un cabin stical System Institutional R Quality And Cost- Open - Internationa IBRD / 86990 Post 250,000.00 654,838.92 Signed 2018-10-27 2018-10-27 2018-11-20 2019-01-14 2018-12-18 2019-01-17 2019-03-26 2019-02-21 2019-05-08 2019-03-28 2019-04-25 2020-03-27 et pour l'élaboration d'un mo eform and Project Managem Based Selection l dèle d'impact des politiques f ent Capacity Building iscales Page 5 GA-CN TIPPEE-84020-CS-QC Component 3: National Stati BS / Recrutement d’un Audit stical System Institutional R Quality And Cost- IBRD / 86990 Post Open - National 60,000.00 30,718.42 Signed 2019-02-15 2018-12-06 2019-03-08 2018-12-06 2019-04-21 2019-03-01 2019-05-19 2019-06-18 2019-04-01 2019-07-23 2019-05-03 2019-08-27 2019-05-07 2020-08-26 eur externe pour les comptes eform and Project Managem Based Selection du projet ent Capacity Building GA-CN TIPPEE-46310-CS-IND Component 2: Build Technic Consultant Qualifi V / Elaboration du manuel de IBRD / 86990 al Capacity and Modernize In Post Open - National 100,000.00 0.00 Canceled 2018-02-19 2018-03-12 2018-04-25 2018-05-25 2018-06-29 2018-12-26 cation Selection procédures de l'ANSEDES frastructure Component 3: National Stati GA-CN TIPPEE-46311-CS-LCS stical System Institutional R Least Cost Selecti / Services de consultants cha IBRD / 86990 Post Open - National 60,000.00 0.00 Canceled 2018-12-03 2018-12-24 2019-02-06 2019-03-06 2019-04-05 2019-05-10 2019-06-14 2019-12-11 eform and Project Managem on rgés de l'audit externe. ent Capacity Building GA-CN TIPPEE-127051-CS-C QS / Recrutement d’une firm e de consultants en communi Component 1: Improved Dat Consultant Qualifi cation pour la conception et IBRD / 86990 a Collection, Statistical Prod Post Open - National 100,000.00 50,811.19 Signed 2019-08-15 2019-09-01 2019-08-16 2019-09-06 2019-09-25 2019-09-08 2019-10-23 2019-09-12 2019-10-25 2019-12-11 cation Selection production des outils de com uction, and Dissemination munication pour la campagn e de sensibilisation de la pha se de dénombrement Component 3: National Stati GA-CN TIPPEE-167219-CS-Q stical System Institutional R Quality And Cost- Open - Internationa CBS / Audit pour les exercice IBRD / 86990 Post 60,000.00 19,718.85 Signed 2020-04-06 2020-04-01 2020-04-08 2020-04-06 2020-05-06 2020-10-16 2020-05-13 2020-11-17 2020-05-18 2021-01-25 2020-05-25 2021-03-10 2020-06-03 2021-03-17 2020-09-01 eform and Project Managem Based Selection l s 2020 -2021 et clôture ent Capacity Building GA-CN TIPPEE-239429-CS-C QS / Recrutement d’un cabin Component 1: Improved Dat Consultant Qualifi et pour l’installation d’un outi IBRD / 86990 a Collection, Statistical Prod Post Open - National 100,000.00 0.00 Canceled 2021-06-21 2021-06-28 2021-06-23 2021-07-10 2021-07-15 2021-07-30 2022-01-26 cation Selection l de pilotage des activités de uction, and Dissemination la Direction Générale de la St atistique GA-CN TIPPEE-239430-CS-C Component 1: Improved Dat QS / Recrutement d’un firme/ Consultant Qualifi IBRD / 86990 a Collection, Statistical Prod Post Open - National 200,000.00 0.00 Canceled 2021-06-21 2021-06-23 2021-07-11 2021-07-14 2021-07-17 2021-10-15 cabinet en communication d cation Selection uction, and Dissemination e la Direction Générale de la Statistique GA-CN TIPPEE-216366-CS-C QS / Recrutement d’un cabin Component 2: Build Technic Consultant Qualifi et pour la réalisation des étu IBRD / 86990 al Capacity and Modernize In Post Open - National 40,000.00 0.00 Canceled 2022-01-14 2022-01-21 2022-02-11 2022-02-14 2022-02-17 2022-03-19 cation Selection des d'architecture pour l’amé frastructure nagement du bâtiment de l’I NS. GA-CN TIPPEE-216425-CS-Q Component 1: Improved Dat CBS / Recrutement d’un cons Quality And Cost- Open - Internationa IBRD / 86990 a Collection, Statistical Prod Post 200,000.00 0.00 Canceled 2021-02-12 2021-02-19 2021-03-10 2021-04-09 2021-04-10 2021-04-25 2021-05-05 2021-12-01 ultant pour la Mise en place Based Selection l uction, and Dissemination d'un système d'information e t base de données. GA-CN TIPPEE-314769-CS-LC Component 3: National Stati S / Recrutement d’un auditeu stical System Institutional R Least Cost Selecti Under Implement r comptable et financier pour IBRD / 86990 Post Open - National 25,000.00 0.00 2022-09-16 2022-10-18 2022-09-23 2022-12-21 2022-10-21 2022-11-20 2022-12-05 2022-12-16 2022-12-29 2023-12-24 eform and Project Managem on ation le projet au titre de l’audit po ent Capacity Building ur les exercices 2022, 2023 e t clôture. GA-CN TIPPEE-337383-CS-C QS / Bureau d'études devant Component 2: Build Technic mener les études architectur Consultant Qualifi Under Implement IBRD / 86990 al Capacity and Modernize In Post Open - National 200,000.00 0.00 2023-02-01 2023-02-03 2023-02-15 2023-03-31 2023-03-31 2023-04-04 2023-10-01 ales, la surveillance et contrô cation Selection ation frastructure le des travaux d’aménageme nt des locaux abritant la DGS INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 3: National Stati GA-CN TIPPEE-46482-CS-IND stical System Institutional R Individual Consult V / Spécialiste en passation d IBRD / P4770 Prior Open 100,000.00 352,023.57 Signed 2018-02-05 2019-12-24 2018-03-26 2018-04-16 2018-09-28 2018-05-21 2018-08-31 2018-11-17 eform and Project Managem ant Selection es marchés (PPA) ent Capacity Building GA-CN TIPPEE-78246-CS-CD S / ACCORD Component 1: Improved Dat POUR LA FOURNITURE DES S IBRD / 86990 a Collection, Statistical Prod Prior Direct Selection Direct 2,135,300.00 2,135,300.00 Under Review 2018-10-01 2018-10-11 2018-12-15 2018-11-16 2019-06-13 ERVICES D'ASSISTANCE TEC uction, and Dissemination HNIQUE DE LA FAO Component 3: National Stati GA-CN TIPPEE-46483-CS-IND stical System Institutional R Individual Consult V / Recrutement d'un compta IBRD / 86990 Post Open 60,000.00 21,932.32 Signed 2018-02-05 2018-03-26 2018-04-16 2019-02-28 2018-05-21 2018-06-08 2018-11-17 eform and Project Managem ant Selection ble pour le projet ent Capacity Building GA-CN TIPPEE-46413-CS-CD S / Recrutement d'une assist Component 1: Improved Dat ance technique pour les trav IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 450,000.00 0.00 Canceled 2018-02-12 2018-02-22 2018-04-28 2018-10-25 aux de l'Enquête Démograph uction, and Dissemination ique et de sante (EDSIII)-MAC RO GA-CN TIPPEE-83965-CS-CD Component 3: National Stati S / Recrutement d'un expert I stical System Institutional R IBRD / 86990 Post Direct Selection Direct 90,000.00 90,564.85 Signed 2018-11-01 2018-11-02 2018-11-11 2019-01-15 2018-12-10 2019-07-14 nternational pour les compte eform and Project Managem s nationaux - Avenant n°1 ent Capacity Building GA-CN TIPPEE-84017-CS-IND Component 3: National Stati V / Recrutement d’un chauffe stical System Institutional R Individual Consult IBRD / 86990 Post Limited 10,000.00 9,539.75 Signed 2018-11-26 2019-01-15 2018-12-01 2019-07-10 2018-12-22 2019-07-11 2019-01-26 2019-07-15 2019-07-25 ur coursier pour le Projet STA eform and Project Managem ant Selection T ent Capacity Building GA-CN TIPPEE-83963-CS-CD Component 1: Improved Dat S / Accord pour la fourniture IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 100,000.00 119,375.82 Signed 2018-11-01 2019-03-14 2018-11-20 2019-01-24 2019-03-17 2019-07-23 des services d'assistance tec uction, and Dissemination hnique de l'UNESCO GA-CN TIPPEE-46475-CS-IND Component 1: Improved Dat V / Recrutement de deux exp Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 160,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 erts pour l'encadrement des ant Selection uction, and Dissemination analyses thématiques. GA-CN TIPPEE-46297-CS-IND Component 2: Build Technic Individual Consult V / Recrutement de (30) Con IBRD / 86990 al Capacity and Modernize In Post Open 280,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 ant Selection sultants pour l'analyse thém frastructure atique du RGPL Page 6 GA-CN TIPPEE-46316-CS-IND Component 3: National Stati V / Recrutement d'un Expert stical System Institutional R Individual Consult IBRD / 86990 Post Open 50,000.00 38,603.28 Signed 2018-11-23 2019-01-01 2019-01-11 2018-01-12 2019-02-01 2018-01-15 2019-03-08 2018-01-20 2019-09-04 informatique application IHP eform and Project Managem ant Selection C. ent Capacity Building GA-CN TIPPEE-87762-CS-IND Component 3: National Stati V / Recrutement d'un expert j stical System Institutional R Individual Consult IBRD / 86990 Post Limited 17,000.00 16,485.04 Signed 2018-11-28 2018-11-28 2018-12-03 2018-12-26 2018-12-17 2018-12-19 2018-12-29 2018-12-17 2019-12-24 unior pour les comptes natio eform and Project Managem ant Selection naux ent Capacity Building GA-CN TIPPEE-100822-CS-C DS / Recrutement d’une assis Component 1: Improved Dat tance technique pour les trav IBRD / P4770 a Collection, Statistical Prod Post Direct Selection Direct 250,000.00 2,109,341.00 Signed 2017-03-15 2018-01-05 2017-03-25 2018-01-19 2017-05-29 2018-02-06 2017-11-25 aux de l’Enquête Démograph uction, and Dissemination ique et de sante (EDSIII)-MAC RO GA-CN TIPPEE-100829-CS-IN Component 3: National Stati DV / Recrutement d’un exper stical System Institutional R Individual Consult IBRD / P4770 Post Open 85,000.00 97,610.38 Signed 2017-02-10 2019-02-23 2017-03-31 2017-04-21 2017-05-26 2017-03-31 2017-11-22 t International pour les comp eform and Project Managem ant Selection tes nationaux ent Capacity Building GA-CN TIPPEE-100827-CS-IN Component 3: National Stati DV / Recrutement de cinq (0 stical System Institutional R Individual Consult IBRD / P4770 Post Open 50,000.00 40,470.35 Signed 2017-02-17 2019-02-23 2017-04-07 2017-04-28 2017-06-02 2017-03-30 2017-11-29 5) experts juniors pour les co eform and Project Managem ant Selection mptes nationaux ent Capacity Building GA-CN TIPPEE-100824-CS-IN Component 3: National Stati DV / Recrutement d’un consu stical System Institutional R Individual Consult IBRD / P4770 Post Open 38,000.00 37,875.00 Signed 2017-01-15 2017-03-05 2017-03-26 2017-04-30 2019-03-05 2017-10-27 ltant pour la rédaction du Ma eform and Project Managem ant Selection nuel de mise en œuvre ent Capacity Building Component 3: National Stati GA-CN TIPPEE-100817-CS-IN stical System Institutional R Individual Consult DV / Recrutement Expert Inte IBRD / P4770 Post Open 80,000.00 63,220.00 Signed 2017-07-24 2019-03-31 2017-09-11 2017-10-02 2017-11-06 2018-07-24 2018-05-05 eform and Project Managem ant Selection rnational Pauvreté ent Capacity Building GA-CN TIPPEE-88257-CS-IND Component 1: Improved Dat Individual Consult V / Recrutement de 80 agent IBRD / 86990 a Collection, Statistical Prod Post Open 300,000.00 0.00 Canceled 2019-03-01 2019-04-10 2019-05-01 2019-06-05 2019-12-02 ant Selection s enquêteurs pour l'EDSG 2èr uction, and Dissemination e vague . GA-CN TIPPEE-46412-CS-IND Component 1: Improved Dat Individual Consult V / Recrutement de 80 agent IBRD / 86990 a Collection, Statistical Prod Post Open 300,000.00 0.00 Canceled 2018-11-30 2019-01-09 2019-01-30 2019-03-06 2019-09-02 ant Selection s enquêteurs pour l'EDSG 1èr uction, and Dissemination e vague . GA-CN TIPPEE-88255-CS-IND Component 1: Improved Dat V / Recrutement de 125 agen Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 400,000.00 0.00 Canceled 2019-09-30 2019-11-18 2019-12-09 2020-01-13 2020-07-11 ts de collecte pour le recense ant Selection uction, and Dissemination ment agricole 4ème vague GA-CN TIPPEE-88253-CS-IND Component 1: Improved Dat V / Recrutement de 125 agen Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 400,000.00 0.00 Canceled 2019-07-01 2019-08-19 2019-09-09 2019-10-14 2020-04-11 ts de collecte pour le recense ant Selection uction, and Dissemination ment agricole 3ème vague GA-CN TIPPEE-88252-CS-IND Component 1: Improved Dat V / Recrutement de 125 agen Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 400,000.00 0.00 Canceled 2019-03-29 2019-05-17 2019-06-07 2019-07-12 2020-01-08 ts de collecte pour le recense ant Selection uction, and Dissemination ment agricole 2ème vague GA-CN TIPPEE-46411-CS-IND Component 1: Improved Dat V / Recrutement de 125 agen Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 400,000.00 0.00 Canceled 2018-11-29 2019-01-17 2019-02-07 2019-03-14 2019-09-10 ts de collecte pour le recense ant Selection uction, and Dissemination ment agricole 1ère vague. GA-CN TIPPEE-46318-CS-IND Component 1: Improved Dat Individual Consult V / Recrutement de 20 agent IBRD / 86990 a Collection, Statistical Prod Post Open 100,000.00 0.00 Canceled 2018-11-16 2018-12-19 2019-01-09 2019-02-13 2019-08-12 ant Selection s collecte prix hors Libreville uction, and Dissemination (18 mois). GA-CN TIPPEE-46415-CS-IND Component 1: Improved Dat Individual Consult V / Recrutement de 200 agen IBRD / 86990 a Collection, Statistical Prod Post Open 360,000.00 0.00 Canceled 2019-01-15 2019-03-05 2019-03-26 2019-04-30 2019-10-27 ant Selection ts pour le recensement des e uction, and Dissemination ntreprises. GA-CN TIPPEE-46302-CS-IND Component 1: Improved Dat V / Recrutement de 5 agents Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 10,000.00 0.00 Canceled 2019-04-01 2019-05-20 2019-06-10 2019-07-15 2020-01-11 pour le traitement des donné ant Selection uction, and Dissemination es de l'enquête satisfaction d es utilisateurs. GA-CN TIPPEE-46494-CS-IND Component 1: Improved Dat V / Recrutement de 30 exper Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 240,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 ts nationaux pour les analyse ant Selection uction, and Dissemination s thématiques du RGPL 2013. GA-CN TIPPEE-46298-CS-IND Component 2: Build Technic Individual Consult V / Recrutement de Quatre (4 IBRD / 86990 al Capacity and Modernize In Post Open 240,000.00 0.00 Canceled 2018-02-23 2018-04-13 2018-05-04 2018-06-08 2018-12-05 ant Selection ) Statisticiens juniors frastructure GA-CN TIPPEE-100819-CS-C Component 1: Improved Dat DS / Recrutement d’une Assi IBRD / P4770 a Collection, Statistical Prod Post Direct Selection Direct 25,000.00 0.00 Canceled 2017-03-15 2017-03-25 2017-05-29 2017-11-25 stance Technique (EDS III)-M uction, and Dissemination ACRO GA-CN TIPPEE-46301-CS-IND Component 1: Improved Dat V / Recrutement de 20 agent Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 30,000.00 0.00 Canceled 2019-03-27 2019-05-06 2019-05-27 2019-07-01 2019-12-28 s enquêteurs pour l'enquête ant Selection uction, and Dissemination satisfaction des utilisateurs. Component 3: National Stati GA-CN TIPPEE-113043-CS-C stical System Institutional R DS / Recrutement d'un exper IBRD / 86990 Post Direct Selection Direct 70,000.00 56,627.50 Signed 2019-05-07 2019-05-02 2019-05-13 2019-05-16 2019-05-02 2019-11-12 eform and Project Managem t international pauvreté ent Capacity Building GA-CN TIPPEE-46296-CS-IND Component 2: Build Technic Individual Consult V / Recrutement d'un expert IBRD / 86990 al Capacity and Modernize In Post Open 260,000.00 0.00 Canceled 2019-10-01 2019-11-19 2019-12-10 2020-01-14 2020-07-12 ant Selection statisticien sénior résident frastructure GA-CN TIPPEE-46526-CS-IND Component 3: National Stati V / Recrutement d'un assista stical System Institutional R Individual Consult IBRD / 86990 Post Open 40,000.00 0.00 Canceled 2019-04-01 2019-04-15 2019-05-11 2019-05-16 2019-05-23 2020-05-17 nt Informaticien pour le proje eform and Project Managem ant Selection t ent Capacity Building GA-CN TIPPEE-46314-CS-IND Component 2: Build Technic Individual Consult V / Recrutement d'un expert IBRD / 86990 al Capacity and Modernize In Post Open 80,000.00 0.00 Canceled 2019-11-01 2019-12-04 2019-12-11 2020-01-06 2020-07-04 ant Selection prix frastructure Page 7 GA-CN TIPPEE-46308-CS-IND Component 3: National Stati V / Recrutement d'un expert stical System Institutional R Individual Consult IBRD / 86990 Post Open 25,000.00 22,724.13 Signed 2018-02-28 2019-08-05 2018-04-18 2019-09-13 2018-05-09 2019-09-26 2018-06-13 2019-10-01 2018-12-10 en développement de sites eform and Project Managem ant Selection WEB ent Capacity Building GA-CN TIPPEE-46303-CS-IND Component 1: Improved Dat Individual Consult V / Recrutement d'un expert IBRD / 86990 a Collection, Statistical Prod Post Open 20,000.00 0.00 Canceled 2019-10-01 2019-11-19 2019-12-10 2020-01-14 2020-07-12 ant Selection en enquêtes satisfaction des uction, and Dissemination utilisateurs GA-CN TIPPEE-120865-CS-C Component 1: Improved Dat DS / Recrutement de quatre ( IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 95,000.00 79,477.00 Signed 2019-04-02 2019-04-22 2019-04-12 2019-05-05 2019-04-16 2019-05-02 2020-04-10 4) Comptables juniors uction, and Dissemination GA-CN TIPPEE-84016-CS-IND V / Recrutement d’un Expert Component 3: National Stati pour l’élaboration d’un Cahie stical System Institutional R Individual Consult IBRD / 86990 Post Limited 10,000.00 9,568.83 Signed 2019-02-15 2019-09-26 2019-02-20 2019-10-10 2019-03-13 2019-10-11 2019-04-17 2019-10-11 2019-10-14 r de charge technique et le C eform and Project Managem ant Selection ontrôle des Travaux d ’Amén ent Capacity Building agement des salles de la DG S GA-CN TIPPEE-129962-CS-IN DV / Recrutement de deux (2 ) consultants juniors en statis Component 1: Improved Dat Individual Consult tique pour la rénovation de la IBRD / 86990 a Collection, Statistical Prod Post Limited 25,000.00 143,654.08 Signed 2019-09-03 2019-09-26 2019-09-08 2020-02-14 2019-09-10 2020-02-17 2019-09-17 2020-02-26 2020-09-11 ant Selection production des indices harmo uction, and Dissemination nises des prix à la consomma tion et le calcul de l’inflation a couverture national GA-CN TIPPEE-129964-CS-IN Component 3: National Stati DV / Recrutement d’un exper stical System Institutional R Individual Consult IBRD / 86990 Post Open 50,000.00 73,300.00 Signed 2019-09-03 2019-09-26 2019-10-02 2020-02-02 2019-10-10 2020-01-14 2019-10-20 2020-01-20 2019-12-19 t pour l’évaluation à mi-parco eform and Project Managem ant Selection urs du projet ent Capacity Building GA-CN TIPPEE-129965-CS-IN DV / Recrutement de deux (2 ) consultants en statistique p Component 1: Improved Dat Individual Consult our la rénovation de la produ IBRD / 86990 a Collection, Statistical Prod Post Limited 42,000.00 115,150.00 Signed 2019-11-01 2019-09-27 2019-11-06 2020-01-15 2019-11-08 2020-02-25 2019-11-15 2020-02-26 2020-11-09 ant Selection ction des indices harmonises uction, and Dissemination des prix à la consommation e t le calcul de l’inflation a cou verture national GA-CN TIPPEE-46306-CS-IND Component 3: National Stati V / Recrutement d'un expert stical System Institutional R Individual Consult IBRD / 86990 Post Open 60,000.00 0.00 Canceled 2019-04-27 2019-06-06 2019-06-27 2019-08-01 2020-01-28 en techniques de communica eform and Project Managem ant Selection tion ent Capacity Building GA-CN TIPPEE-107719-CS-IN Component 1: Improved Dat Individual Consult DV / Recrutement de cinq (0 IBRD / 86990 a Collection, Statistical Prod Post Direct 95,000.00 0.00 Canceled 2019-04-02 2019-04-12 2019-04-07 2019-04-09 2019-04-10 2020-04-04 ant Selection 5) experts juniors pour les co uction, and Dissemination mptes nationaux GA-CN TIPPEE-139913-CS-IN Component 3: National Stati DV / Recrutement d'un exper stical System Institutional R Individual Consult IBRD / 86990 Post Limited 52,000.00 81,290.25 Signed 2019-10-15 2019-11-10 2019-10-16 2020-01-02 2019-10-21 2020-03-31 2019-10-27 2020-04-04 2020-10-21 t en communication pour le p eform and Project Managem ant Selection rojet ent Capacity Building Component 3: National Stati GA-CN TIPPEE-149262-CS-IN stical System Institutional R Individual Consult DV / Recrutement d'un Comp IBRD / 86990 Post Open 62,000.00 0.00 Canceled 2019-12-16 2019-12-27 2020-01-09 2020-01-16 2020-01-21 2021-01-20 eform and Project Managem ant Selection table Sénior pour le Projet ent Capacity Building Component 3: National Stati GA-CN TIPPEE-157650-CS-IN stical System Institutional R Individual Consult DV / Recrutement d’un Coord IBRD / 86990 Post Open 75,000.00 237,182.52 Signed 2020-02-14 2020-03-17 2020-03-18 2020-06-19 2020-03-23 2020-07-27 2020-03-27 2020-09-01 2021-03-22 eform and Project Managem ant Selection onnateur de Projet ent Capacity Building GA-CN TIPPEE-157654-CS-IN Component 3: National Stati DV / Recrutement d’un Resp stical System Institutional R Individual Consult IBRD / 86990 Post Open 35,000.00 0.00 Canceled 2020-02-21 2020-03-25 2020-03-27 2020-04-04 2021-03-30 onsable des Sauvegardes en eform and Project Managem ant Selection vironnmentales et sociales ent Capacity Building Component 3: National Stati GA-CN TIPPEE-157656-CS-IN stical System Institutional R Individual Consult DV / Recrutement d’un Resp IBRD / 86990 Post Open 55,000.00 168,351.90 Signed 2020-02-10 2020-03-27 2020-03-05 2021-02-05 2020-03-06 2021-02-10 2020-03-13 2021-02-15 2021-03-08 eform and Project Managem ant Selection onsable en suivi-évaluation ent Capacity Building GA-CN TIPPEE-157660-CS-IN DV / Recrutement d’un consu Component 1: Improved Dat ltant individuel pour la constr Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Limited 30,000.00 18,714.87 Signed 2020-02-10 2020-06-21 2020-02-15 2020-06-26 2020-02-17 2020-08-20 2020-02-20 2020-08-21 2020-03-21 uction des comptes définitifs ant Selection uction, and Dissemination sur 30 ans par retropolation et la conception de la matric e de comptabilité sociale GA-CN TIPPEE-157662-CS-IN Component 1: Improved Dat DV / Recrutement d’un spéci Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Limited 30,000.00 20,794.30 Signed 2020-02-10 2020-06-21 2020-02-14 2020-06-26 2020-02-16 2020-08-20 2020-02-19 2020-08-24 2020-03-20 aliste pour l’élaboration de la ant Selection uction, and Dissemination matrice de comptabilité socia le GA-CN TIPPEE-84010-CS-IND Component 3: National Stati V / Recrutement d’un Chargé stical System Institutional R Individual Consult IBRD / 86990 Post Open 42,000.00 0.00 Canceled 2019-11-08 2019-12-02 2019-12-07 2019-12-19 2020-12-18 d'un Chargé d'Opération pou eform and Project Managem ant Selection r le projet ent Capacity Building GA-CN TIPPEE-84028-CS-IND Component 3: National Stati V / Recrutement d'un expert stical System Institutional R Individual Consult IBRD / 86990 Post Open 80,000.00 0.00 Canceled 2020-01-01 2020-02-19 2020-03-11 2020-04-15 2020-10-12 en évaluation du système d'I eform and Project Managem ant Selection nformation sanitaire pour l’E ent Capacity Building DSG GA-CN TIPPEE-46300-CS-IND Component 3: National Stati V / Recrutement d'un expert stical System Institutional R Individual Consult IBRD / 86990 Post Open 30,000.00 0.00 Canceled 2019-11-01 2019-11-22 2019-11-29 2019-12-09 2020-06-06 pour l'élaboration du progra eform and Project Managem ant Selection mme de formation du SSN. ent Capacity Building GA-CN TIPPEE-46299-CS-IND Component 2: Build Technic V / Recrutement d'un expert Individual Consult IBRD / 86990 al Capacity and Modernize In Post Open 120,000.00 0.00 Canceled 2018-03-05 2018-04-23 2018-05-14 2018-06-18 2018-12-15 pour la mise en place de la p ant Selection frastructure olitique de formation de l'Age nce. GA-CN TIPPEE-166614-CS-IN Component 1: Improved Dat Individual Consult DV / Recrutement d’un consu IBRD / 86990 a Collection, Statistical Prod Post Open 80,000.00 0.00 Canceled 2020-03-30 2020-04-25 2020-04-27 2020-05-02 2020-07-01 ant Selection ltant statisticien d’enquete p uction, and Dissemination our le projet GA-CN TIPPEE-175652-CS-C Component 1: Improved Dat DS / Recrutement d’un consu IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 80,000.00 38,546.99 Signed 2020-06-05 2020-05-29 2020-06-10 2020-06-23 2020-06-15 2020-07-07 2020-12-12 ltant statisticien d’enquete p uction, and Dissemination our le projet Page 8 GA-CN TIPPEE-175656-CS-C Component 3: National Stati DS / Recrutement d’un exper stical System Institutional R IBRD / 86990 Post Direct Selection Direct 30,000.00 0.00 Canceled 2020-06-01 2020-05-29 2020-06-06 2020-06-10 2020-08-09 t pour élaborer le cadre de s eform and Project Managem uivi des resultats du projet ent Capacity Building GA-CN TIPPEE-181523-CS-C DS / Recrutement d’un exper Component 1: Improved Dat t CAPI « chef de mission » po IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 50,000.00 108,325.00 Signed 2020-07-14 2020-07-13 2020-07-17 2020-08-27 2020-07-24 2020-09-16 2020-11-21 ur le projet d’enquête pilote uction, and Dissemination pour le ciblage des Gabonais Economiquement Faibles GA-CN TIPPEE-181524-CS-C DS / Recrutement d’un « exp Component 1: Improved Dat ert enquête » pour le projet d IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 25,000.00 35,750.00 Signed 2020-07-14 2020-07-13 2020-07-17 2020-08-28 2020-07-25 2020-09-16 2020-09-23 ’enquête pilote pour le ciblag uction, and Dissemination e des Gabonais Economique ment Faibles GA-CN TIPPEE-181520-CS-C DS / Recrutement d’un « exp Component 1: Improved Dat ert informatique » pour le pr IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 32,000.00 44,250.00 Signed 2020-07-14 2020-07-13 2020-07-20 2020-08-28 2020-07-26 2020-09-16 2020-09-24 ojet d’enquête pilote pour le uction, and Dissemination ciblage des Gabonais Econo miquement Faibles GA-CN TIPPEE-181522-CS-IN DV / recrutement d’un « exp Component 1: Improved Dat Individual Consult ert communication » pour le IBRD / 86990 a Collection, Statistical Prod Post Limited 28,000.00 0.00 Canceled 2020-07-16 2020-07-13 2020-07-18 2020-07-22 2020-07-25 2020-09-23 ant Selection projet d’enquête pilote pour l uction, and Dissemination e ciblage des Gabonais Econ omiquement Faibles GA-CN TIPPEE-201470-CS-IN DV / Recrutement d’un consu Component 1: Improved Dat Individual Consult ltant national pour la SNDS-II IBRD / 86990 a Collection, Statistical Prod Post Open 34,000.00 0.00 Canceled 2020-11-06 2020-10-27 2020-12-02 2020-12-07 2020-12-11 2021-04-08 ant Selection spécialiste en Statistiques de uction, and Dissemination l'Environnement et Développ ement Rural GA-CN TIPPEE-201472-CS-IN DV / Recrutement d’un consu Component 1: Improved Dat Individual Consult ltant pour l’élaboration de la IBRD / 86990 a Collection, Statistical Prod Post Open 26,000.00 34,366.25 Terminated 2020-10-30 2020-10-27 2020-11-25 2021-04-14 2020-11-30 2021-05-27 2020-12-07 2021-06-11 2021-03-07 ant Selection stratégie de financement des uction, and Dissemination activités statistiques 2021-20 25. GA-CN TIPPEE-213698-CS-C DS / Recrutement d’un consu Component 1: Improved Dat ltant international informatici IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 50,000.00 41,949.25 Signed 2021-01-18 2021-01-25 2021-01-20 2021-01-28 2021-01-24 2021-02-11 2021-03-15 en spécialisé en traitement i uction, and Dissemination nformatique des recensemen ts et enquêtes. GA-CN TIPPEE-216369-CS-IN Component 1: Improved Dat Individual Consult DV / Recrutement de cinq (0 IBRD / 86990 a Collection, Statistical Prod Post Limited 82,000.00 180,431.76 Signed 2021-02-08 2021-04-12 2021-02-13 2021-07-07 2021-02-15 2021-06-30 2021-02-20 2021-07-11 2021-12-31 ant Selection 5) statisticiens pour les comp uction, and Dissemination tes nationaux Component 3: National Stati GA-CN TIPPEE-163246-CS-IN stical System Institutional R Individual Consult DV / Recrutement d'un comp IBRD / 86990 Post Open 33,000.00 0.00 Canceled 2021-01-22 2021-02-22 2021-03-01 2021-03-10 2022-03-05 eform and Project Managem ant Selection table pour le projet ent Capacity Building GA-CN TIPPEE-213702-CS-C DS / Recrutement d’un cabin et pour la mise en œuvre de l Component 1: Improved Dat a méthodologie de l’enquête IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 74,000.00 0.00 Canceled 2021-01-19 2021-02-03 2021-01-22 2021-01-30 2021-02-05 qualitative et le suivi du déro uction, and Dissemination ulement des groupes de disc ussions à Libreville et ses pér iphéries. GA-CN TIPPEE-216436-CS-C Component 3: National Stati DS / Recrutement d'un Comp stical System Institutional R IBRD / 86990 Post Direct Selection Direct 33,000.00 22,945.85 Signed 2021-02-07 2021-02-07 2021-02-14 2021-02-10 2021-02-18 2021-03-22 2021-12-15 table supplémentaire pour le eform and Project Managem projet ent Capacity Building GA-CN TIPPEE-223116-CS-C DS / Recrutement d’un burea Component 1: Improved Dat u en appui à l’amélioration et IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 400,000.00 726,773.47 Signed 2021-03-15 2021-04-06 2021-03-18 2021-04-27 2021-03-26 2021-06-01 2021-09-22 à la production des statistiqu uction, and Dissemination es économiques et macroéco nomiques GA-CN TIPPEE-239431-CS-IN Component 3: National Stati DV / Recrutement d’un Spéci stical System Institutional R Individual Consult IBRD / 86990 Post Open 20,000.00 11,930.56 Signed 2021-06-18 2021-06-18 2021-07-09 2021-09-20 2021-07-11 2021-09-20 2021-07-14 2021-09-24 2021-12-31 aliste en Sauvegarde Environ eform and Project Managem ant Selection nementale pour le projet ent Capacity Building GA-CN TIPPEE-239432-CS-IN Component 3: National Stati DV / Recrutement d’un Spéci stical System Institutional R Individual Consult IBRD / 86990 Post Open 20,000.00 12,555.48 Signed 2021-06-18 2021-06-18 2021-07-09 2021-09-10 2021-07-11 2021-09-14 2021-07-14 2021-09-19 2021-12-31 aliste en Sauvegarde sociale eform and Project Managem ant Selection pour le projet ent Capacity Building GA-CN TIPPEE-239433-CS-IN Component 3: National Stati DV / Responsable logistique stical System Institutional R Individual Consult IBRD / 86990 Post Open 17,000.00 10,315.02 Signed 2021-06-18 2021-06-18 2021-07-09 2021-08-18 2021-07-11 2021-08-30 2021-07-14 2021-09-01 2021-12-31 pour la gestion des immobilis eform and Project Managem ant Selection ations du Projet ent Capacity Building GA-CN TIPPEE-216427-CS-IN DV / Recrutement d’un exper Component 2: Build Technic Individual Consult t des Sauvegardes environne IBRD / 86990 al Capacity and Modernize In Post Open 35,000.00 0.00 Canceled 2021-02-10 2021-03-06 2021-03-08 2021-03-11 2021-11-06 ant Selection mentales et sociales dans le frastructure cadre de l’aménagement du bâtiment de l’INS. GA-CN TIPPEE-201471-CS-IN Component 1: Improved Dat DV / Recrutement d’un consu Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Open 13,000.00 0.00 Canceled 2020-10-29 2020-10-27 2020-11-24 2020-11-29 2020-12-06 2021-02-04 ltant pour la formation en pla ant Selection uction, and Dissemination nification stratégique. GA-CN TIPPEE-248547-CS-IN Component 1: Improved Dat DV / Recrutement Directeur Individual Consult IBRD / 86990 a Collection, Statistical Prod Post Limited 42,000.00 76,887.84 Signed 2021-09-06 2021-09-16 2021-09-11 2021-10-22 2021-09-12 2021-11-08 2021-09-15 2021-11-22 2021-11-14 CREA pour la conception gra ant Selection uction, and Dissemination phique et communication dig itale pour le projet GA-CN TIPPEE-273349-CS-C DS / Recrutement d’une Assi Component 1: Improved Dat stance technique dans le cad IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 153,000.00 0.00 Canceled 2022-01-20 2022-01-22 2022-02-01 2022-07-31 re de l’enquête démographiq uction, and Dissemination ue et de sante au Gabon Page 9 GA-CN TIPPEE-273350-CS-C Component 3: National Stati DS / Recrutement d’un spéci stical System Institutional R IBRD / 86990 Post Direct Selection Direct 134,000.00 0.00 Under Review 2022-01-21 2022-01-20 2022-01-24 2022-01-28 2023-10-31 aliste en passation de march eform and Project Managem é ent Capacity Building GA-CN TIPPEE-276300-CS-C Component 1: Improved Dat DS / Recrutement d'un comp IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 20,000.00 34,083.51 Signed 2022-02-09 2022-02-07 2022-02-17 2022-02-09 2022-02-21 2022-02-15 2022-12-18 table junior pour la comptabil uction, and Dissemination ité nationale GA-CN TIPPEE-291101-CS-C DS / Recrutement d’un consu Component 1: Improved Dat ltant international pour appu IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 155,375.00 146,825.00 Signed 2022-04-22 2022-04-22 2022-04-25 2022-04-28 2022-05-03 2022-06-11 2022-08-26 yer l’Equipe technique de l’E uction, and Dissemination nquête Gabonaise pour le sui vi et l’Evaluation de la Pauvr eté – EGEP3 GA-CN TIPPEE-291103-CS-C DS / Recrutement d’un consu Component 1: Improved Dat ltant en appui au comité de c IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 237,750.00 205,500.00 Signed 2022-04-22 2022-04-23 2022-04-25 2022-05-13 2022-05-03 2022-08-09 2022-10-20 oordination pour le Recense uction, and Dissemination ment des Gabonais Economi quement Faibles phase 2 GA-CN TIPPEE-298433-CS-C DS / Consultant international Component 1: Improved Dat en cartographie censitaire nu IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct 60,000.00 74,291.12 Signed 2022-06-14 2022-06-25 2022-06-17 2022-06-28 2022-06-25 2022-07-23 2022-10-18 mérique pour le Recensemen uction, and Dissemination t Général de la Population et des Logements Gabon 2023 GA-CN TIPPEE-308288-CS-C Component 1: Improved Dat DS / Recrutement d’expert e IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct - National 75,000.00 56,654.32 Signed 2022-08-14 2022-08-23 2022-08-20 2022-08-24 2022-08-29 2022-08-26 2022-12-27 n enquête des unités non sta uction, and Dissemination ndard GA-CN TIPPEE-323265-CS-IN DV / Expert sénior en compta bilité nationale en vue de la r Component 1: Improved Dat éévaluation de la production Individual Consult Direct - Internation Under Implement IBRD / 86990 a Collection, Statistical Prod Post 42,000.00 0.00 2022-11-04 2022-11-03 2022-11-14 2022-11-08 2022-12-05 2022-11-21 2023-01-09 2023-04-09 du secteur informel dans les ant Selection al ation uction, and Dissemination Comptes nationaux du Gabo n à travers la prise en compt e des nouvelles sources de d onnées (EGEP 2017 et RGE 2 021-2022) GA-CN TIPPEE-323269-CS-IN Component 1: Improved Dat DV / Expert sénior en compta Individual Consult Direct - Internation Under Implement IBRD / 86990 a Collection, Statistical Prod Post 15,000.00 0.00 2022-11-04 2022-11-03 2022-11-14 2022-11-30 2022-12-05 2023-01-09 2023-04-09 bilité nationale pour le rattra ant Selection al ation uction, and Dissemination page des comptes nationaux sous le SCN93 GA-CN TIPPEE-337384-CS-IN Component 1: Improved Dat Individual Consult Pending Impleme DV / Audit de la gestion des d IBRD / 86990 a Collection, Statistical Prod Post Limited 25,000.00 0.00 2023-02-01 2023-02-06 2023-02-27 2023-04-03 2023-05-03 ant Selection ntation échets biomédicaux uction, and Dissemination GA-CN TIPPEE-338759-CS-IN Component 3: National Stati DV / Expert pour l’élaboratio stical System Institutional R Individual Consult Open - Internationa Pending Impleme IBRD / 86990 Post 50,000.00 0.00 2023-02-06 2023-03-18 2023-03-23 2023-04-07 2023-06-06 n du rapport d'achèvement d eform and Project Managem ant Selection l ntation u projet ent Capacity Building GA-CN TIPPEE-359516-CS-C Component 1: Improved Dat DS / Consultant junior Statisti Under Implement IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct - National 12,000.00 0.00 2023-05-05 2023-05-14 2023-05-07 2023-05-10 2023-10-31 cien pour la Direction Généra ation uction, and Dissemination le de la Statistique GA-CN TIPPEE-308267-CS-C DS / Ingénieur accompagnat Component 2: Build Technic eur spécialiste en bâtiment (i IBRD / 86990 al Capacity and Modernize In Post Direct Selection Direct - National 37,500.00 0.00 Canceled 2022-08-14 2022-08-20 2022-08-29 2022-10-28 ngénieur en génie civil) en e frastructure xpertise vénale et diagnostiq ue technique d’un immeuble avant acquisition GA-CN TIPPEE-359518-CS-C DS / Deux (2) Consultants d’a Component 1: Improved Dat ppui à l’élaboration des texte Direct - Internation IBRD / 86990 a Collection, Statistical Prod Post Direct Selection 70,000.00 0.00 Under Review 2023-05-09 2023-02-26 2023-05-15 2023-05-24 2023-09-21 s d’application de la loi n°01 al uction, and Dissemination 6/22 portant institution et or ganisation du système statist ique national GA-CN TIPPEE-359519-CS-C Component 1: Improved Dat DS / Deux (2) Consultants sta IBRD / 86990 a Collection, Statistical Prod Post Direct Selection Direct - National 146,000.00 0.00 Under Review 2023-05-05 2023-04-03 2023-05-11 2023-05-20 2023-09-17 tisticiens analystes pour l’ap uction, and Dissemination pui à la diffusion des donnée s statistiques GA-CN TIPPEE-367181-CS-IN Component 1: Improved Dat DV / Recrutement de six (6) s Individual Consult Under Implement IBRD / 86990 a Collection, Statistical Prod Post Limited 40,000.00 0.00 2023-06-19 2023-06-27 2023-06-26 2023-07-01 2023-07-04 2023-10-31 tatisticiens comptables junior ant Selection ation uction, and Dissemination s pour les besoins des compt es nationaux GA-CN TIPPEE-367184-CS-IN Component 1: Improved Dat DV / Recrutement de Six (6) Individual Consult Under Implement IBRD / 86990 a Collection, Statistical Prod Post Limited 40,000.00 0.00 2023-06-19 2023-06-27 2023-06-26 2023-07-01 2023-07-04 2023-10-31 consultants Nationaux en Sta ant Selection ation uction, and Dissemination tistique des Prix et du Comm erce Extérieur GA-CN TIPPEE-367185-CS-IN Component 1: Improved Dat DV / Recrutement d'un consu Individual Consult Under Implement IBRD / 86990 a Collection, Statistical Prod Post Limited 77,000.00 0.00 2023-06-19 2023-06-27 2023-06-26 2023-07-01 2023-07-04 2023-09-22 ltant Conseiller Technique po ant Selection ation uction, and Dissemination ur l'accompagnement au Cha ngement (INSTAT) Page 10 Republic of Malawi Ministry of Education, Science and Technology Private Bag 328 Lilongwe 3 PROCUREMENT PLAN For PROJECT PREPARATORY ADVANCE (PPA) Name of Project: Skills for A Vibrant Economy (SAVE) Loan No./Credit No./Grant No.: P172627 Financiers: World Bank Implementing Agency: Ministry of Education, Science & Technology Beneficiary Institutions: Ministry of Education, Science & Technology Ministry of Labour Ministry of Youth TEVETA NCHE Ministry of Gender Selected Public Universities SAVE PROJECT PPA PROCUREMENT PLAN I. General 1.Project information Country: Malawi Project Name: Skills for A Vibrant Economy (SAVE) Project ID: P172627 2.Project Implementation Agency: Ministry of Education Science and Technology 3.Date of the Procurement Plan: June 22, 2020 4.Period covered by this Procurement Plan: June 2020 to November 2021 II. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. III. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. IV. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Public Procurement and Disposal of Assets Act, 2017 and its subsidiary instruments namely: The Public Procurement Regulations, 2004, Desk Instructions (2005), Standard bidding Documents and Circulars for the Public Procurement and Disposal of Assets (PPDA) Authority such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations under the following conditions: o Provision of “set-asides” contracts for small enterprises shall not be applied. o Criteria such as environmental aspect, extent of local content, technology transfer, and managerial, scientific & operational skills development shall not be used in the evaluation of bids unless specifically agreed by the Bank on case to case basis. o Procurement Documents include provisions, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.4(c) and 5.5 of the Procurement Regulations, the request for bids/request for proposals/request for quotations document shall require that Bidders/Proposers submitting Bids/Proposals/quotations present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. V. Prequalification: Not expected for works/goods packages in the procurement plan. VI. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable VII. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. VIII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. IX. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. X. Proposed Procedures for CDD Components: Not Applicable XI. Other Relevant Procurement Information: None XII. Reference to (if any) Project Operational/Procurement Manual: The Ministry of Education Science and Technology (MoEST) team will prepare Procurement manual. The Procurement Plan will also form part of the Project Implementation Manual. XIII. Procurement Approach and Prior Review Thresholds: The Procurement Arrangements as indicated in the below table will be used. The thresholds for the Bank’s prior review requirements are also provided in the table: Prior-review Thresholds for Procurement Methods Thresholds Procurem Substanti Works Goods, IT & Non-Consulting Shortlist of National ent al Services Consultants Type Risk ($`000) Works 10,000 Open Request Request Engineerin Internatio for for Open Open Open Consultin g& nal or Quotatio Quotatio National internatio National g Constructio n or n or or NCB nal or ICB or NCB Services n ICB National National ($'000) ($'000) ($'000) ($'000) Supervision ($'000 Shopping Shopping ($'000) ($'000) ($'000) Goods, IT 2,000 & Non- Consulting ≧ < ≦ ≧ < ≦ < ≦ Services Consultan 1,000 ts (Firms) 7,000 7,000 200 1,000 1,000 100 200 300 Individual 300 Consultan ts *These prior review thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Procurement Packages/Plan with Procurement Arrangements and Time Schedule: as per the table below: b) PROCUREMENT PLAN A. Works There are no envisaged works under the PPA. 1 2 3 4 5 6 7 8 9 10 Ref. Contract Estimat Market Selecti Prequ Domesti Revie Expect Expecte No. Description ed Approa on alifica c w ed bid d Cost ch Method tion Prefere by openin Contrac US$ (yes/n nce Bank g date t o) (yes/no) (Prior Signatu / Post) re Date 1. N/A B. Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 10 Ref. Contract Estimat Market Selecti Prequ Domesti Revie Expect Expecte No. Description ed Approa on alifica c w ed bid d Cost ch Method tion Prefere by openin Contrac US$ (yes/n nce Bank g date t o) (yes/no) (Prior Signatu / Post) re Date 1. Procurement of 1 motor 75,000.0 Limited RFQ No No Post 21-Jul- 21-Aug- vehicle (4 x 4 Twin Cab 0 20 20 Vehicles) for the PIU 2. Procurement of various 85,500.0 Limited RFQ No No Post 21-Jul- 21-Aug- ICT Items: Computer 0 20 20 laptops, Computer Desktops, Photocopier, printers, cameras, Flash discs, Anti-virus, MS package, Extension cables, Extension cables 3. Procurement of 187,000. Open RFB No No Post 1-Aug- 1-Oct-20 Teleconferencing 00 National 20 equipment and licences under COVID- 19 support 4. Procurement of 14,500.0 Limited RFQ No No Post 1-Aug- 31-Aug- Internet modems 0 20 20 devices under COVID- 19 support 5. Procurement of Hand 7,000.00 Limited RFQ No No Post 1-Aug- 31-Aug- sanitizers, face 20 20 masks/shields and gloves under COVID-19 support C. Consultancy Services 1 2 3 4 5 6 7 8 9 10 Ref. Contract Estimat Market Selecti Evalua Shortli Review Review Expecte No. Description ed Approa on tion sting by by Bank d bid Cost ch Method Option (yes/n Bank (Prior / opening US$ o) (Prior / Post) date Post) 1. Consultancy service to 46,000. Open INDV No No Post 1-Aug-20 7-Sep-20 develop Project 00 Implementation Manual 2. Consultancy service to 86,000. Open CQS Rated No Post 1-Aug-20 7-Sep-20 carry out Environmental 00 National Social Safeguard studies-ESMF, SEP, ESMCP, P4R (Firm) 3. Hiring of Project 64,000. Open INDV No No Post 1-Aug-20 7-Sep-20 Manager 00 4. Hiring of Financial 48,000. Open INDV No No Post 1-Aug-20 7-Sep-20 Management Specialist 00 5. Hiring of Procurement 48,000. Open INDV No No Post 1-Aug-20 7-Sep-20 Specialist 00 6. Hiring of M & E Specialist 48,000. Open INDV No Post 1-Aug-20 7-Sep-20 00 7. Hiring of 48,000. Open INDV No Post 1-Aug-20 7-Sep-20 Communications 00 Specialist 8. Hiring of Social 48,000. Open INDV No Post 1-Oct-20 15-Nov- Safeguards Specialist 00 20 9. Hiring of Environmental 48,000. Open INDV No Post 31-Jan- 15-Mar- Specialist 00 21 21 10. Consultancy Service to 92,000. Open CQS Rated No Post 28-Feb- 15-Apr- conduct a Skills Needs 00 National 21 21 Assessment (Firm) 11. Consultancy to 60,000. Open CQS Rated No Post 1-Oct-20 15-Nov- conceptualize a holistic, 00 National 20 integrated ICT-based structure that details elements related to M&E (including EMIS), labor market information and integration platform, communications channels, and mobile- based activities (Firm) 12. Consultant on Dual 53,000. Open CQS Rated No Post 28-Feb- 15-Apr- Learning -Engage, 00 National 21 21 Inception reports, sensitization meetings and advertisements, Engage Partner organizations to participate in the programme, Engage and Train Master Trainers, Build capacity of the key staff in the project, Benchmark Dual Learning, Pilot Dual learning with STC, LTC, MZTC (Firm) 13. Consultancy Service to 75,000. Open CQS Rated No Post 21-Oct- 28-Nov- conduct assessment of 00 National 20 20 ODeL requirements (infrastructure for Higher Education Institutions (HEI) and Technical and Vocational Education) in TEVET institutions (Firm) 14. Consultancy Services on 33,000. Open INDV No Post 1-Aug-20 22-Sep- proposal development 00 20 for tertiary institutions such as TEVET Providers, Nalikule and DCE 15. RFQ – Request for Quotations; CQS - Consultant’s Qualification-based Selection; QCBS – Quality and Cost-based Selection and; INDV - Individual Consultant Selection. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. Title of the person signing the Letter: PROCUREMENT Malawi : Skills for A Vibrant Economy Project PLAN General Information Country: Malawi 2022-08-21 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172627 GPN Date: 2021-09-24 Project Name: Skills for A Vibrant Economy Project Loan / Credit No: IDA / D8220, IDA / 68910 Lilongwe University of Agriculture and Natural Resources Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Bids - MW-LUANAR-314354-CW-RF Supporting Increased Access Single Stage - One E Small Works SPD Pending Imp 2024-05-1 B / Construction of fashion an IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 1,500,000.00 0.00 2023-07-01 2023-07-16 2023-08-30 2023-10-04 2023-11-12 nvelope (1 envelope proce lementation 0 d design learning complex - ms in Higher Education ss) NRC MW-LUANAR-314279-CW-RF Request for Bids - B / Construction food process Supporting Increased Access Single Stage - One E Small Works SPD Pending Imp 2024-01-0 ing laboratory bio energy lab IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 615,000.00 0.00 2023-07-01 2023-07-21 2023-09-04 2023-09-06 2023-10-06 nvelope (1 envelope proce lementation 4 facilities and post-harvest an ms in Higher Education ss) d bio lab facilities – BUNDA MW-LUANAR-314361-CW-RF Q / Rehabilitation of Animal S Supporting Increased Access Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-12-0 cience Teaching Farm, Sports IDA / D8220 to Skills Development Progra Post Limited tions (Non Bank-S 102,100.00 0.00 2023-05-25 2023-08-08 tions nvelope lementation 6 Facilities, employment office ms in Higher Education PD) and mushroom production st ructures– BUNDA MW-LUANAR-314294-CW-RF Q / Rehabilitation of the four Supporting Increased Access Request for Quota Request for Quota Single Stage - One E Pending Imp 2023-12-1 Laboratories block, refurbish IDA / D8220 to Skills Development Progra Post Limited tions (Non Bank-S 47,300.00 0.00 2023-06-04 2023-09-07 tions nvelope lementation 6 ment of abattoir and rehabilit ms in Higher Education PD) ation of vet nary medicine cl assroom– NRC GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-LUANAR-314288-GO-RF Supporting Increased Access Request for Quota Single Stage - One E Pending Impl Q / Procurement of assorted l IDA / D8220 to Skills Development Progra Post Limited 22,800.00 0.00 2022-11-19 2023-01-12 2023-04-22 tions nvelope ementation aboratory supplies - NRC ms in Higher Education MW-LUANAR-314357-GO-RF Q / Procurement of ICT Equip ment Supporting Increased Access Request for Quota Single Stage - One E Under Imple Procurement of 5 Laptops for IDA / D8220 to Skills Development Progra Post Limited 45,000.00 0.00 2022-11-01 2022-10-19 2022-12-27 2023-02-05 tions nvelope mentation computer labs and Odel cent ms in Higher Education res – Procurement of office equip ment NRC -Procurement of of fice equipment – Bunda MW-LUANAR-314370-GO-RF Supporting Increased Access Single Stage - One E B / Install fibre links to impro IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 134,400.00 0.00 Canceled 2023-02-01 2023-02-21 2023-04-07 2023-05-22 2023-06-30 2023-09-28 nvelope ve internet connectivity at B ms in Higher Education unda MW-LUANAR-314366-GO-RF Supporting Increased Access Request for Quota Single Stage - One E Pending Impl Q / Procurement of e learning IDA / D8220 to Skills Development Progra Post Limited 10,450.00 0.00 2022-11-24 2023-01-23 2023-04-23 tions nvelope ementation and e book resources – Bund ms in Higher Education a MW-LUANAR-314374-GO-RF Supporting Increased Access Q / Procurement of 3 farm m Request for Quota Single Stage - One E Under Imple IDA / D8220 to Skills Development Progra Post Limited 40,000.00 0.00 2023-04-02 2022-10-19 2023-06-11 2023-09-09 achineries for training of SPI tions nvelope mentation ms in Higher Education technologies – Bunda MW-LUANAR-314368-GO-RF Supporting Increased Access Request for Quota Single Stage - One E Under Imple Q / Procurement of motor ve IDA / D8220 to Skills Development Progra Post Limited 115,000.00 0.00 2022-10-27 2023-01-24 2023-01-07 2023-07-06 tions nvelope mentation hicle NRC and Bunda ms in Higher Education MW-LUANAR-314355-GO-DIR Supporting Increased Access Under Imple / Upgrading LUANAR financial IDA / D8220 to Skills Development Progra Post Direct Selection Direct - National 15,000.00 0.00 2022-11-30 2022-11-01 2023-01-14 2022-10-03 2023-03-15 2023-06-13 mentation management system – Bund ms in Higher Education a MW-LUANAR-334629-GO-RF B / Procurement of ICT and e Supporting Increased Access -learning equipment (Buildin Single Stage - One E Under Imple IDA / 68910 to Skills Development Progra Post Request for Bids Open - National 797,400.00 0.00 2023-01-12 2023-01-21 2023-02-26 2023-02-10 2023-04-12 2023-02-21 2023-05-12 2023-03-09 2023-06-16 2023-09-14 g links between Bunda and it nvelope mentation ms in Higher Education s satellite capasses to improv e remote accesses and deliv ery Odel programs) MW-LUANAR-309121-GO-RF B / Supply Delivery, Installati Supporting Increased Access on, Commissioning and Hand Single Stage - One E IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 350,000.00 0.00 Canceled 2022-08-22 2022-08-29 2022-09-11 2022-09-08 2022-10-26 2022-10-12 2022-11-25 2022-12-19 2023-03-29 over of a Link between Bund nvelope ms in Higher Education a and NRC College and E- Le arning Recording Studio Syst ems Bunda College MW-LUANAR-309121-GO-RF B. / Supply Delivery, Installati Supporting Increased Access on, Commissioning and Hand Single Stage - One E Under Imple IDA / 68910 to Skills Development Progra Post Request for Bids Open - National 350,000.00 0.00 2022-08-29 2022-09-12 2022-09-08 2022-10-12 2022-10-12 2022-11-18 2022-11-01 2022-12-14 2023-03-08 over of a Link between Bund nvelope mentation ms in Higher Education a and NRC College and E- Le arning Recording Studio Syst ems Bunda College NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-LUANAR-361929-GO-RF Supporting Increased Access Request for Quota Single Stage - One E Under Imple Q / Renewal of Office 365 Lic IDA / 68910 to Skills Development Progra Post Limited 40,000.00 0.00 2023-05-27 2023-05-11 2023-07-30 2023-08-14 tions nvelope mentation ense ms in Higher Education Page 1 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-LUANAR-314373-CS-CQ Supporting Increased Access S / Consultancy services for S Consultant Qualifi Pending Impleme IDA / D8220 to Skills Development Progra Post Limited 21,500.00 0.00 2022-11-30 2023-01-04 2023-02-13 2023-03-20 2023-09-16 upervision of NRC and Bunda cation Selection ntation ms in Higher Education Rehabilitation works MW-LUANAR-314372-CS-CQ Supporting Increased Access S / Consultancy services for d Consultant Qualifi Under Implement IDA / D8220 to Skills Development Progra Post Limited 185,490.00 0.00 2022-11-30 2023-02-03 2023-01-04 2023-05-06 2023-02-08 2023-03-15 2023-09-11 esign and Supervision of NRC cation Selection ation ms in Higher Education and Bunda Construction Wor ks MW-LUANAR-314360-CS-CQ Supporting Increased Access S / Consultancy services to c Consultant Qualifi IDA / D8220 to Skills Development Progra Post Limited 45,000.00 0.00 Canceled 2022-09-15 2022-11-15 2022-10-20 2022-11-19 2022-12-24 2023-06-22 onduct EIA, for NRC and Bun cation Selection ms in Higher Education da Construction Project INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-LUANAR-334554-CS-IND Supporting Increased Access V / Consultancy Service for th Individual Consult Under Implement IDA / 68910 to Skills Development Progra Post Limited 45,000.00 0.00 2023-01-11 2023-01-09 2023-01-31 2023-01-09 2023-02-21 2023-02-15 2023-03-28 2023-05-12 e preparation of ESMPs for C ant Selection ation ms in Higher Education onstruction Projects at NRC a nd Bunda College Page 2 Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [Original: February 2020] 2. Period covered by this procurement plan: The procurement period of project covered from year February 2020 till June 2020. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1.5 All million 2. NCB (Goods) Above US$ 1.5 All million 3. ICB (Works) Above US$ 5 million All 4. NCB (Works) Above US$ 5 million All 2. Prequalification. Bidders for works activities shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 4. Summary of the Procurement Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) Refer to PP. III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 0.5 million 2. Single Source (Firms) All 3. Individual Above US$ 0.2 million 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Consultancy Assignments with Selection Methods and Time Schedule Refer to PP PROCUREMENT Lebanon : Lebanon Health Resilience Project PLAN General Information Country: Lebanon 2020-02-15 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P163476 GPN Date: 2020-06-08 Project Name: Lebanon Health Resilience Project Loan / Credit No: IBRD / 87710 Ministry of Public Health Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MOPH-RFQ-COVID19-001 / Pr Strengthen the Government’ Request for Quota IBRD / 87710 Prior 1,500,000.00 68,815.00 Signed 2019-03-18 2019-03-18 2020-04-28 2019-03-18 ocurement of PPEs s capacity to respond to CO tions VID-19 MOPH-RFQ-COVID19-002 / Pr Strengthen the Government’ Request for Quota IBRD / 87710 Prior 2,000,000.00 1,638,696.38 Signed 2019-03-18 2019-03-18 2020-04-16 2019-03-18 ocurement of Ventilators s capacity to respond to CO tions VID-19 MOPH-DS-COVID19-004 / PR Strengthen the Government’ IBRD / 87710 Post Direct Selection Direct 400,000.00 0.00 Canceled 2020-04-16 2020-04-15 2020-04-21 2020-05-26 2020-11-22 OCUREMEMT OF RAPID TEST s capacity to respond to CO KITS VID-19 LB-MOPH-RFQ005 / Procure Strengthen the Government’ Request for Quota Single Stage - One E ment of Goods for Negative P IBRD / 87710 s capacity to respond to CO Post Open - National 60,000.00 45,065.00 Signed 2020-12-19 2020-12-18 2021-02-13 2021-01-15 2021-08-12 tions nvelope ressure Rooms VID-19 LB-MOPH-RFQ003 / Procure Strengthen the Government’ Request for Quota Single Stage - One E IBRD / 87710 Post Limited 450,000.00 151,766.00 Signed 2020-12-19 2020-12-24 2021-02-13 2020-12-29 2021-08-12 ment of COVID-19 Related Eq s capacity to respond to CO tions nvelope uipment VID-19 LB-MOPH-RFQ004 / Procure Strengthen the Government’ Request for Quota Single Stage - One E IBRD / 87710 Post Limited 450,000.00 74,551.00 Signed 2020-12-19 2021-01-19 2021-02-13 2021-04-15 2021-08-12 ment of COVID-19 Related Eq s capacity to respond to CO tions nvelope uipment VID-19 LB-MOPH-DS001 / Procurem Strengthen the Government’ ent of a UPS system for COVI IBRD / 87710 s capacity to respond to CO Post Direct Selection Direct 20,000.00 79,464.81 Signed 2021-01-08 2021-03-23 2021-01-13 2021-03-23 2021-02-17 2021-04-30 2021-08-16 D-19 unit at Qana Hospital VID-19 LB-MOPH-NP004 / Installatio Strengthen the Government’ n of a Negative Pressure syst IBRD / 87710 s capacity to respond to CO Post Direct Selection Direct 40,000.00 0.00 Canceled 2021-01-19 2021-01-24 2021-02-28 2021-08-27 em at Al Bouwar hospital VID-19 LB-MOPH-PFIZER / Procurem Strengthen the Government’ IBRD / 87710 Prior Direct Selection Direct 18,000,000.00 39,012,960.00 Signed 2021-01-19 2021-02-12 2021-01-24 2021-02-12 2021-02-28 2021-01-18 2021-08-27 ent of COVID-19 Vaccine s capacity to respond to CO VID-19 LB-MOPH-NP001 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E n of a Negative Pressure Syst IBRD / 87710 s capacity to respond to CO Post Limited 40,000.00 185,987.81 Signed 2021-02-01 2021-02-09 2021-03-29 2021-01-28 2021-09-25 tions nvelope em at Baabda Public Hospital VID-19 LB-MOPH-NP002 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E n of a Negative Pressure Syst IBRD / 87710 s capacity to respond to CO Post Limited 20,000.00 178,831.00 Signed 2021-02-01 2021-02-09 2021-03-29 2021-01-29 2021-09-25 tions nvelope em at Jezzin Hospital VID-19 LB-MOPH-SD001 / Rehabilita Strengthen the Government’ Request for Quota Single Stage - One E tion of COVID-19 ICU Unit at IBRD / 87710 s capacity to respond to CO Post Limited 40,000.00 190,890.62 Signed 2021-02-06 2021-03-23 2021-04-03 2021-02-02 2021-09-30 tions nvelope Sir El Donnieh Public Hospital VID-19 LB-MOPH-NP003 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E n of Negative Pressure at Bat IBRD / 87710 s capacity to respond to CO Post Limited 20,000.00 143,216.24 Signed 2021-02-11 2021-02-09 2021-04-08 2021-01-30 2021-10-05 tions nvelope roun Hospital VID-19 LB-MOPH-NP0010 / Installati Strengthen the Government’ Request for Quota Single Stage - One E on of Negative Pressure Syst IBRD / 87710 s capacity to respond to CO Post Limited 40,000.00 145,769.34 Signed 2021-02-11 2021-04-25 2021-04-08 2021-01-29 2021-10-05 tions nvelope em at Mays Al Jabal Hospital VID-19 LB-MOPH-NP005 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E n of Negative Pressure Syste IBRD / 87710 s capacity to respond to CO Post Limited 40,000.00 209,447.08 Signed 2021-02-11 2021-02-09 2021-04-08 2021-01-29 2021-10-05 tions nvelope m at Marjeyoun Hospital VID-19 LB-MOPH-NP006 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E n of Negative Pressure Syste IBRD / 87710 s capacity to respond to CO Post Limited 40,000.00 136,490.26 Signed 2021-02-11 2021-02-16 2021-04-08 2021-02-17 2021-10-05 tions nvelope m at Saida Hospital VID-19 LB-MOPH-NP007 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E n of Negative Pressure Syste IBRD / 87710 s capacity to respond to CO Post Limited 30,000.00 163,133.63 Signed 2021-02-11 2021-02-09 2021-04-08 2021-01-29 2021-10-05 tions nvelope m at Al Chahhar Al Gharbi VID-19 LB-MOPH-NP008 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E n of Negative Pressure Syste IBRD / 87710 s capacity to respond to CO Post Limited 30,000.00 122,087.36 Signed 2021-02-11 2021-02-10 2021-04-08 2021-01-30 2021-10-05 tions nvelope m at Bcharri Hospital VID-19 LB-MOPH-NP009 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E n of Negative Pressure Syste IBRD / 87710 s capacity to respond to CO Post Limited 20,000.00 94,908.03 Signed 2021-02-11 2021-04-25 2021-04-08 2021-02-18 2021-10-05 tions nvelope m at Nabatiye Hospital VID-19 LB-MOPH-RFQ006 / Procure Strengthen the Government’ Request for Quota Open - Internationa Single Stage - One E ment of Pfizer Vaccine Relate IBRD / 87710 s capacity to respond to CO Post 1,000,000.00 675,350.00 Signed 2021-02-22 2021-02-24 2021-04-19 2021-04-28 2021-10-16 tions l nvelope d Accessories VID-19 LB-MOPH-RFQ007 / Procure Strengthen the Government’ Request for Quota Single Stage - One E IBRD / 87710 Post Open - National 500,000.00 520,111.61 Signed 2021-03-07 2021-03-03 2021-05-02 2021-07-27 2021-10-29 ment of Spare Parts for CT Sc s capacity to respond to CO tions nvelope an VID-19 LB-MOPH-RFQ008 / Procure Strengthen the Government’ Request for Quota Single Stage - One E IBRD / 87710 Post Open - National 350,000.00 356,270.00 Signed 2021-03-24 2021-04-06 2021-05-19 2021-06-09 2021-11-15 ment of Oxygen Related Equi s capacity to respond to CO tions nvelope pment VID-19 Page 1 LB-MOPH-RFQ009 / Procure Strengthen the Government’ Request for Quota Open - Internationa Single Stage - One E IBRD / 87710 Post 500,000.00 405,000.00 Signed 2021-04-10 2021-04-06 2021-06-05 2021-05-13 2021-12-02 ment of Accessories for Vacci s capacity to respond to CO tions l nvelope nes VID-19 LB-MOPH-RFQ010 / Installati Strengthen the Government’ Request for Quota Single Stage - One E Under Imple IBRD / 87710 Post Open - National 300,000.00 0.00 2021-04-14 2021-04-12 2021-06-09 2021-12-06 on of Negative Pressure Syst s capacity to respond to CO tions nvelope mentation ems VID-19 LB-MOPH-RFQ011 / Procure Strengthen the Government’ Request for Quota Open - Internationa Single Stage - One E Under Imple ment of CT Scan Spare Parts IBRD / 87710 s capacity to respond to CO Post 50,000.00 0.00 2021-04-30 2021-05-18 2021-06-25 2021-12-22 tions l nvelope mentation for Al Menyeh and Chebaa Pu VID-19 blic Hospitals LB-MOPH-SD002 / Installatio Strengthen the Government’ Request for Quota Single Stage - One E IBRD / 87710 Post Limited 30,000.00 14,740.00 Signed 2021-05-25 2021-02-01 2021-07-20 2021-02-16 2022-01-16 n of Oxygen Related Equipm s capacity to respond to CO tions nvelope ent VID-19 LB-MOPH-DS002 / Procurem Strengthen the Government’ ent of syringes for the vaccin IBRD / 87710 s capacity to respond to CO Post Direct Selection Direct 60,000.00 60,000.00 Signed 2021-08-05 2021-08-09 2021-08-10 2021-08-10 2021-09-14 2021-08-11 2022-03-13 ation process VID-19 LB-MOPH-RFQ012 / Procure Strengthening project mana Request for Quota Open - Internationa Single Stage - One E IBRD / 87710 Post 180,000.00 25,047.74 Signed 2021-09-26 2021-09-20 2021-11-21 2022-04-05 2022-05-20 ment of an accounting softw gement and monitoring tions l nvelope are LB-MOPH-RFQ014 / Procure Strengthening project mana Request for Quota Single Stage - One E Under Imple IBRD / 87710 Post Limited 2,000.00 0.00 2021-11-03 2021-11-23 2021-12-29 2022-06-27 ment of Office Equipment (La gement and monitoring tions nvelope mentation ptops) LB-MOPH-RFQ013 / Procure Strengthen the Government’ Request for Quota Single Stage - One E IBRD / 87710 Post Open - National 100,000.00 43,000.00 Signed 2021-11-03 2021-11-18 2021-12-29 2021-12-08 2022-06-27 ment of Vaccine Accessories s capacity to respond to CO tions nvelope VID-19 LB-MOPH-DS003 / Procurem Strengthen the Government’ IBRD / 87710 Post Direct Selection Direct 40,000.00 22,780.00 Signed 2022-01-31 2022-01-27 2022-02-05 2022-02-21 2022-03-12 2022-03-01 2022-09-08 ent of Spare Parts for Tebnin s capacity to respond to CO e Hospital VID-19 LB-MOPH-RFQ015 / Procure Strengthening project mana Request for Quota Single Stage - One E Pending Impl IBRD / 87710 Post Open - National 2,000.00 0.00 2022-11-06 2023-01-01 2023-06-30 ment of office equipment (La gement and monitoring tions nvelope ementation ptops) LB-MOPH-RFQ016 / Procure Strengthen the Government’ Request for Quota Single Stage - One E Under Imple IBRD / 87710 Post Open - National 30,000.00 0.00 2023-02-06 2023-02-07 2023-04-03 2023-09-30 ment of IT Equipment s capacity to respond to CO tions nvelope mentation VID-19 LB-MOPH-RFQ017 / Procure Strengthening project mana Request for Quota Single Stage - One E Under Imple IBRD / 87710 Post Open - National 25,000.00 0.00 2023-02-06 2023-02-07 2023-04-03 2023-09-30 ment of Helium Tanks gement and monitoring tions nvelope mentation LB-MOPH-RFQ018 / Procure Strengthen the Government’ Request for Quota Single Stage - One E Under Imple ment of Spare Parts for the El IBRD / 87710 s capacity to respond to CO Post Open - National 75,000.00 0.00 2023-03-15 2023-03-15 2023-05-10 2023-11-06 tions nvelope mentation evators at Al Nabatieh Public VID-19 Hospital NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LB-MOPH-164381-NC-UN / Pr Strengthen the Government’ UN Agencies (Dire ocurement of equipment and IBRD / 87710 s capacity to respond to CO Prior Direct 20,000,000.00 0.00 Canceled 2020-03-14 2020-03-19 2020-04-23 2020-10-20 ct) tools to respond to COVID-19 VID-19 LB-MOPH-164382-NC-WHO / Strengthen the Government’ UN Agencies (Dire Procurement of goods in resp IBRD / 87710 s capacity to respond to CO Prior Direct 6,000,000.00 5,562,071.99 Signed 2020-03-31 2020-04-01 2020-04-05 2020-04-01 2020-05-10 2020-04-04 2020-11-06 ct) onse to COVID19 VID-19 LB-MOPH-164385-NC-UNOPS Strengthen the Government’ UN Agencies (Dire / Procurement of PPEs and Eq IBRD / 87710 s capacity to respond to CO Prior Direct 9,500,000.00 5,742,367.72 Signed 2020-03-15 2020-04-01 2020-03-15 2020-04-03 2020-03-15 2020-04-03 2020-03-15 ct) uipments VID-19 LB-MOPH-RFQ019 / Procure Strengthening project mana Request for Quota Single Stage - One E Under Imple IBRD / 87710 Post Open - National 15,000.00 0.00 2023-04-15 2023-04-11 2023-06-10 2023-12-07 ment of an Antivirus Softwar gement and monitoring tions nvelope mentation e LB-MOPH-RFQ020 / Maintena Strengthening project mana Request for Quota Single Stage - One E Under Imple nce, Support and Update of t IBRD / 87710 Post Open - National 30,000.00 0.00 2023-05-27 2023-06-05 2023-07-22 2024-01-18 gement and monitoring tions nvelope mentation he Ministry Mobile Applicatio n LB-MOPH-RFQ021 / Provision Strengthening project mana Request for Quota Single Stage - One E Under Imple IBRD / 87710 Post Open - National 10,000.00 0.00 2023-06-06 2023-06-12 2023-08-01 2024-01-28 of SMS Services gement and monitoring tions nvelope mentation LB-MOPH-RFQ022 / Provision Strengthening project mana Request for Quota Single Stage - One E Pending Impl IBRD / 87710 Post Open - National 20,000.00 0.00 2023-06-12 2023-08-07 2024-02-03 of Landline Internet Services gement and monitoring tions nvelope ementation CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual LB-MOPH-159410-CS-QCBS / Strengthening project mana Quality And Cost- Open - Internationa IBRD / 87710 Prior 540,000.00 990,766.00 Signed 2020-02-14 2020-02-17 2020-03-06 2020-02-18 2020-04-19 2020-08-11 2020-05-17 2020-10-28 2020-06-16 2020-11-05 2020-07-21 2021-01-04 2020-08-25 2020-12-30 2021-08-25 Third-party agent gement and monitoring Based Selection l LB-MOPH-197566-CS-LCS / F Strengthening project mana Least Cost Selecti Open - Internationa IBRD / 87710 Post 36,000.00 50,870.00 Signed 2020-10-03 2020-10-02 2020-10-24 2020-10-07 2020-12-07 2021-03-31 2021-01-04 2021-07-02 2021-02-03 2021-06-05 2021-03-10 2021-06-23 2021-04-14 2021-08-13 2021-10-11 inancial Auditor gement and monitoring on l LB-MOPH-ICS-004 / Hiring of Strengthening project mana Consultant Qualifi Under Implement an Environmental and Social IBRD / 87710 Post Limited 18,000.00 0.00 2022-11-01 2022-11-08 2022-11-15 2023-02-01 2022-12-15 2023-01-19 2023-07-18 gement and monitoring cation Selection ation Specialist and Grievance Mec hanism Officer INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HR-001-PROJECT MANAGER / Strengthening project mana IBRD / 87710 Post Direct Selection Direct 42,000.00 42,000.00 Signed 2020-05-14 2020-06-30 2020-05-24 2020-07-14 2020-07-28 2020-07-02 2021-01-24 Project Manager gement and monitoring HR-003-MONITORING AND E Strengthening project mana Individual Consult Under Implement IBRD / 87710 Post Limited 26,400.00 0.00 2020-06-12 2020-07-13 2020-06-17 2020-08-28 2020-07-08 2020-08-28 2020-08-12 2021-02-08 VALUATION / Monitoring and gement and monitoring ant Selection ation evaluation Page 2 HR-004-FINANCIAL OFFICER Strengthening project mana IBRD / 87710 Post Direct Selection Direct 26,400.00 55,440.00 Signed 2020-05-16 2020-07-13 2020-05-26 2020-07-14 2020-07-30 2020-07-02 2021-01-26 / Financial officer gement and monitoring HR-005-TRAINING AND COM Strengthening project mana Individual Consult Under Implement MUNICATION / Training and c IBRD / 87710 Post Limited 21,600.00 0.00 2020-06-12 2020-07-13 2020-06-17 2020-07-08 2020-08-12 2021-02-08 gement and monitoring ant Selection ation ommunication coordinator HR-006-OPERATIONS ASSIST Strengthening project mana Individual Consult IBRD / 87710 Post Limited 21,600.00 43,380.00 Signed 2020-06-12 2020-07-13 2020-06-17 2020-08-04 2020-07-08 2020-08-04 2020-08-12 2020-08-02 2021-02-08 ANT / Operations assistant gement and monitoring ant Selection LB-MOPH-188195-CS-CDS / T Strengthen the Government’ IBRD / 87710 Post Direct Selection Direct 10,000.00 204,620.70 Signed 2020-08-19 2020-09-02 2020-08-29 2020-09-03 2020-11-02 2020-08-27 2021-05-01 echnical audit for covid-19 co s capacity to respond to CO verage VID-19 LB-MOPH-191340-CS-INDV / Strengthening project mana Individual Consult IBRD / 87710 Post Limited 15,600.00 29,900.00 Signed 2020-09-02 2020-09-02 2020-09-07 2020-09-03 2020-09-28 2020-09-03 2020-11-02 2020-09-02 2021-05-01 Administrative Assistant gement and monitoring ant Selection LB-MOPH-191343-CS-INDV / Strengthening project mana Individual Consult IBRD / 87710 Post Limited 20,400.00 20,400.00 Signed 2020-09-02 2020-09-03 2020-09-07 2020-09-03 2020-09-28 2020-09-03 2020-11-02 2020-09-02 2021-05-01 Monitoring and Evaluation gement and monitoring ant Selection LB-MOPH-201928-CS-INDV / Strengthening project mana Individual Consult IBRD / 87710 Post Limited 18,000.00 0.00 Canceled 2020-10-28 2020-11-02 2020-11-02 2020-11-23 2020-12-28 2021-06-26 IT Analyst gement and monitoring ant Selection LB-MOPH-202741-CS-INDV / Strengthening project mana Individual Consult IBRD / 87710 Post Open 18,000.00 0.00 Canceled 2020-11-04 2020-11-05 2020-12-23 2021-01-13 2021-02-17 2021-08-16 IT Analyst gement and monitoring ant Selection LB-MOPH-ICM-001 / Selectio Strengthen the Government’ Pending Impleme IBRD / 87710 Post Direct Selection Direct 2,250.00 0.00 2020-11-27 2020-12-07 2021-02-10 2021-08-09 n of Isolation Center Manager s capacity to respond to CO ntation VID-19 LB-MOPH-ICM-002 / Selectio Strengthen the Government’ Pending Impleme IBRD / 87710 Post Direct Selection Direct 2,250.00 0.00 2020-11-30 2020-12-10 2021-02-13 2021-08-12 n of Isolation Center Manager s capacity to respond to CO ntation VID-19 LB-MOPH-ICM-003 / Selectio Strengthen the Government’ Pending Impleme IBRD / 87710 Post Direct Selection Direct 2,250.00 0.00 2020-11-30 2020-12-10 2021-02-13 2021-08-12 n of Isolation Center Manager s capacity to respond to CO ntation VID-19 LB-MOPH-ICM-004 / Selectio Strengthen the Government’ Pending Impleme IBRD / 87710 Post Direct Selection Direct 2,250.00 0.00 2020-11-30 2020-12-10 2021-02-13 2021-08-12 n of isolation center manager s capacity to respond to CO ntation VID-19 LB-MOPH-ICM-005 / Selectio Strengthen the Government’ Pending Impleme IBRD / 87710 Post Direct Selection Direct 2,250.00 0.00 2020-11-30 2020-12-10 2021-02-13 2021-08-12 n of Isolation Center Manager s capacity to respond to CO ntation VID-19 LB-MOPH-ICM-006 / Selectio Strengthen the Government’ Pending Impleme IBRD / 87710 Post Direct Selection Direct 2,250.00 0.00 2020-11-30 2020-12-10 2021-02-13 2021-08-12 n of Isolation Center Manager s capacity to respond to CO ntation VID-19 LB-MOPH-ICM-007 / Selectio Strengthen the Government’ Pending Impleme IBRD / 87710 Post Direct Selection Direct 2,250.00 0.00 2020-11-30 2020-12-10 2021-02-13 2021-08-12 n of Isolation Center s capacity to respond to CO ntation VID-19 LB-MOPH-ICM-008 / Selectio Strengthen the Government’ Pending Impleme IBRD / 87710 Post Direct Selection Direct 3,000.00 0.00 2020-11-30 2020-12-10 2021-02-13 2021-08-12 n of Isolation Center Manager s capacity to respond to CO ntation VID-19 LB-MOPH-ICS-001 / Selection Strengthening project mana Individual Consult Under Implement IBRD / 87710 Post Open 18,000.00 0.00 2021-01-11 2021-01-11 2021-03-01 2021-03-22 2021-04-26 2021-10-23 of an IT Analyst gement and monitoring ant Selection ation LB-MOPH-ICS-002 / Selection Strengthening project mana Individual Consult IBRD / 87710 Post Open 16,800.00 0.00 Signed 2021-06-08 2021-06-17 2021-07-27 2021-10-11 2021-08-17 2021-10-09 2021-09-21 2022-03-20 of a Financial Assistant gement and monitoring ant Selection HR-007-SENIOR CLINICAL M Strengthen the Government’ ANAGER / Hiring of a Senior T IBRD / 87710 s capacity to respond to CO Post Direct Selection Direct 9,600.00 19,200.00 Signed 2021-09-07 2021-09-14 2021-09-17 2021-10-07 2021-11-21 2021-09-09 2022-05-20 echnical and Clinical Manage VID-19 r for the Pharmacovigilance p rogram HR-008-CLINICAL PV OFFICE Strengthen the Government’ R / Hiring of a Clinical Pharm IBRD / 87710 s capacity to respond to CO Post Direct Selection Direct 8,400.00 16,800.00 Signed 2021-09-07 2021-09-14 2021-09-17 2021-10-07 2021-11-21 2021-09-09 2022-05-20 acovigilance Officer VID-19 HR-009-CLINICAL PV OFFICE Strengthen the Government’ Under Implement R / Hiring of a Clinical Pharm IBRD / 87710 s capacity to respond to CO Post Direct Selection Direct 8,400.00 0.00 2021-09-07 2021-09-14 2021-09-17 2021-11-21 2022-05-20 ation acovigilance Officer VID-19 HR-010-DATA OPERATOR / H Strengthen the Government’ iring of a Data Operator for t IBRD / 87710 s capacity to respond to CO Post Direct Selection Direct 4,800.00 9,600.00 Signed 2021-09-07 2021-09-14 2021-09-17 2021-10-07 2021-11-21 2021-09-09 2022-05-20 he Pharmacovigilance Progra VID-19 m HR-011-DATA OPERATOR / H Strengthen the Government’ iring of a Data Operator for t IBRD / 87710 s capacity to respond to CO Post Direct Selection Direct 4,800.00 9,600.00 Signed 2021-09-07 2021-09-14 2021-09-17 2021-10-07 2021-11-21 2021-09-09 2022-05-20 he Pharmacovigilance Progra VID-19 m LB-MOPH-ICS-003 / Hiring of Strengthening project mana Individual Consult Under Implement an Environmental and Social IBRD / 87710 Post Open 18,000.00 0.00 2022-03-17 2022-03-21 2022-05-05 2022-05-26 2022-06-30 2022-12-27 gement and monitoring ant Selection ation Specialist and Grievance Mec hanism Officer LB-MOPH-DS004 / Provision Strengthen the Government’ Under Implement IBRD / 87710 Post Direct Selection Direct - National 30,000.00 0.00 2022-09-23 2022-09-28 2022-10-03 2022-09-29 2022-12-07 2023-06-05 of Information Security Servi s capacity to respond to CO ation ces VID-19 LB-MOPH-ICS-005 / Hiring of Strengthening project mana Individual Consult Under Implement a Primary Health Care Techni IBRD / 87710 Post Open - National 20,400.00 0.00 2023-05-15 2023-05-16 2023-07-03 2023-07-24 2023-08-28 2024-02-24 gement and monitoring ant Selection ation cal Coordinator Page 3 PROCUREMENT PLAN Project information: INDIA-State of Maharashtra’s Agribusiness Rural Transformation - [SMART] Project ID : P 168310 Project Implementation Agency: The lead implementing agency will be the Department of Agriculture [DOA] of the Government of Maharashtra. Department of Agriculture, Department of Marketing, Department of Animal Husbandry and Department of Rural Development are the four line departments participating in the project with eight autonomous agencies / undertakings namely Village Social Transformation Foundation (VSTF), Maharashtra State Rural Livelihood Mission, Mahila Arthik Vikas Mahamandal (MAVIM), Maharashtra Cooperative Development Corporation (MCDC), Maharashtra State Warehousing Corporation (MSWC), Maharashtra State Agriculture Marketing Board (MSAMB), Maharashtra State Cotton Growers Cooperative Marketing Federation (MahaCot) and Pune Municipal Corporation (PMC). Date of the Procurement Plan: October ___, 2019 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” July 2016, Revised November 2017 and August 2018 [“Procurement Regulations”] the Bank’s Systematic Tracking and Exchanges in Procurement [STEP] system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Public Disclosure Authorized Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. Project Procurement Strategy for Development (PPSD): PPSD has been prepared for the project after carrying out extensive market analysis has been carried out for different packages of procurement. Decisions on packages and lots are made to ensure adequate participation of bidders. Consultancy contracts are framed based on market research and packaging decided in terms of scope of services and period. Based on risk and market analysis, the procurement plan has been prepared to set out the selection methods to be followed by the Borrower during project implementation in the procurement of works, goods, IT system procurement, non-consulting and consulting services financed by the World Bank. Procurement methods. Table 1 describes the various procurement methods to be used for activities financed by the loan. The thresholds indicated in Table 1 will apply to the initial 18 months of implementation and may be modified during project implementation based on procurement performance. Table 1: Procurement Methods Thresholds (US$ Procurement Approaches and Methods Equivalent) Open international (Goods, IT, and Non- > 10 million consulting services) Open national (Goods, IT, and Non-consulting > 100,000 and up to 10 services) million National request for quotation (Goods/Works) Up to 100,000 Open international (Works) > 40 million Open national (Works) > 100,000 and up to 40 million Direct selection No threshold; For Goods / Works / Non- consulting services: According to paragraphs 6.8–6.10 of the Regulations; For Consultants: According to paragraphs 7.13–7.15 of the Regulations Shortlist of national consultants Up to 800,000 Procurement prior-review thresholds. The Bank will prior review contracts above the threshold indicated below: a. Works including Supply & Installation of Plant and Equipment: All contracts more than US$10 million equivalent b. Goods and IT System: All contracts more than US$2 million equivalent c. Non-consulting services: All contracts more than US$2 million equivalent d. Consultants: All contracts (i) more than or equal to US$1 million equivalent for firms; and (i) more than or equal to US$300,000 equivalent for individuals e. In addition to above, and irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: • procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulation; • competitive dialogue; • sustainable procurement; • selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations; and • best and final offer. National procurement procedure conditions (NPP conditions). National competition for the procurement of goods, works, and non-consulting services per established thresholds will be conducted in accordance with paragraphs 5.3–5.5 of Section V of the Regulations and the provisions contained in the loan agreement and the following provisions: a. Only the model bidding documents agreed with the World Bank (and as amended from time to time) shall be used for bidding. b. Invitations to bid shall be advertised on a widely used website or electronic portal with free open access at least 30 days prior to the deadline for the submission of bids, unless otherwise agreed in the approved procurement plan. c. No special preferences will be accorded to any bidder either for price or for other terms and conditions when competing with foreign bidders, state-owned enterprises, small-scale enterprises, or enterprises from any given state. d. Except with the prior concurrence of the Bank, there shall be no negotiation of price with the bidders, even with the lowest evaluated bidder. e. Government e-Marketplace (GeM) set-up by Ministry of Commerce, Government of India will be acceptable for procurement under Request for Quotations (RFQ) method. f. At the Borrower’s request, the Bank may agree to the Borrower’s use, in whole or in part, of its electronic procurement system, provided that the Bank is satisfied with the adequacy of such system g. Procurement will be open to eligible firms from any country. This eligibility shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations h. The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals include a signed acceptance in the bid, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. i. The Borrower shall use an effective complaints mechanism for handling procurement related complaints in a timely manner. j. Procurement Documents will include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts. Use of GeM (Government e-Marketplace) will be allowed in lieu of RFQ (Request for Quotation) as per following details: a) up to INR 50,000 in catalog mode (viz. any available item could be selected by Implementing Agency without further competition), provided selected Item/Supplier meeting the requisite quality, specification and delivery period. b) up to INR 3 Million from the Supplier having lowest price amongst at least three Suppliers meeting the requisite quality, specification and delivery period. The tools for online bidding and online reverse auction available on GeM may be used by the Purchaser. c) up to INR equivalent of US$ 100,000 from the Supplier having lowest price and meeting the requisite quality, specification and delivery period after mandatorily obtaining bids from at least three Suppliers, using online bidding or reverse auction tool provided on GeM. d) While making use of GeM portal, Borrower shall make use of Special Terms and Conditions meant for World Bank financed projects. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations : Not Applicable Domestic Preference as specified under paragraph 5.51 of the Procurement Regulations: Goods: is applicable for those contracts identified in the Procurement Plan tables Works: is not applicable OTHER RELEVANT PROCUREMENT INFORMATION Community Driven Development (CDD): The eligible Community-Based Organisations (CBOs) will undertake procurement at the community level under project. Under the WB Procurement Framework Regulations, the “Community Driven Development” will be followed for all the Procurements which will be carried out by eligible CBOs. Adhering to CDD arrangements, the Request for Quotation (RFQ), Local Competitive Bidding and Direct Selection will be used for Procurement of Goods, Works and Non-Consulting Services. For procurement of Consultants, Consultants’ Qualification-Based Selection (CQS) Method and Selection of Individual Consultant (IC) methods will be used. The detailed guidelines and standard documents for procurement under CDD will be provided to these CBOs to have common procurement documents. Prior review by World Bank. In the case of contracts subject to prior review, the Implementing Agencies will seek the World Bank’s no objection before granting/agreeing to: (a) an extension of the stipulated time for performance of a contract that either increases the contract price or has an impact on the planned completion of the project; (b) any substantial modification of the scope of works, goods, non- consulting services, or consulting services and other significant changes to the terms and conditions of the contract; (c) any variation order or amendment (except in cases of extreme urgency) that, singly or combined with all variation orders or amendments previously issued, increases the original contract amount by more than 15 percent; and (d) the proposed termination of the contract. Complaints received in all prior review cases shall be sent to Bank for review and the response to the complaint in such cases, shall be cleared with the Bank. Complaints with allegations of fraud and corruption, shall be shared with Bank, irrespective of the thresholds. All contracts not covered under prior review by the Bank will be subject to post review during implementation support missions and/or special post review missions, including missions by consultants hired by the Bank. The Bank may conduct, at any time, Independent Procurement Reviews of all the contracts financed under the loan. Even for Post Review cases, the inputs of Bank on Technical Specifications/TORs will be obtained by project. Disclosure of procurement information. The following documents shall be disclosed on the project/state websites: (i) a Procurement Plan and updates; (ii) an invitation for bids for goods and works for all contracts; (iii) request for expression of interest for selection/hiring of consulting services; (iv) contract awards of goods and works procured under international and national procedures; (v) a list of contracts/purchase orders placed under shopping procedures on a quarterly basis; (vi) a list of contracts under direct contracting (DC) on a quarterly basis; (vii) a monthly financial and physical progress report of all contracts; and (viii) an action taken report on the complaints received on a quarterly basis. The following details shall be sent to the World Bank for publishing on the United Nations Development Business and the World Bank external website: (a) an invitation for bids for procurement of goods and works using open international procedures, (b) contract award details of all procurement of goods and works using open international procedure, and (c) a list of contracts/purchase orders placed following DC procedures on a quarterly basis. Further, IAs will also publish on their websites any information required under the provisions of ‘suo moto’ disclosure as specified by the Right to Information Act. Procurement Packages for key procurements - Consultancy Services for first 18 months # Activity Category Number Estimat Estimat Procurement of ed cost ed cost Methods Packag in INR, in USD es Rs Lakh (1 USD = Rs.70) Environmental and Consultanc Open National Social Assessment y Services CQS 1 & Preparation of 1 29.79 42,557 Lump Sum ESMF for SMART Contract Project Consultanc Direct Pilot Credit Rating of y Services Selection 2 2 17.1 24,429 FPOs by M-CRIL Ltd Lump Sum Contract Functional review of Consultanc Open National the Department of y Services Direct RFP 3 Agriculture and 1 74.00 1,05,714 Lump Sum Directorate of Contract Marketing Consultanc Open y Services International, State Technical QCBS Support Group for 17,14,28 EOI and RFP 4 Productive 1 1200 6 Hybrid Partnership and Contract (i.e. Market Access Plans Lump Sum & Time Based) Consultanc Open Regional Technical y Services International, Services Group -1 QCBS for Vidarbha Region 10,00,00 EOI and RFP 5 1 700 for Productive 0 Hybrid Partnership and Contract (i.e. Market Access Plans Lump Sum & Time Based ) # Activity Category Number Estimat Estimat Procurement of ed cost ed cost Methods Packag in INR, in USD es Rs Lakh (1 USD = Rs.70) Consultanc Open Regional Technical y Services International, Services Group -2 QCBS for Marathwada 10,00,00 EOI and RFP 6 Region for 1 700 0 Hybrid Productive Contract (i.e. Partnership and Lump Sum & Market Access Plans Time Based ) Consultanc Open Regional Technical y Services International, Services Group -3 QCBS for Western 10,00,00 EOI and RFP 7 Maharashtra Region 1 700 0 Hybrid for Productive Contract (i.e. Partnership and Lump Sum & Market Access Plans Time Based ) Regional Technical Consultanc Open Services Group -4 y Services International, for North QCBS Maharashtra & 10,00,00 EOI and RFP 8 1 700 Konkan Region for 0 Hybrid Productive Contract (i.e. Partnership and Lump Sum & Market Access Plans Time Based ) Monitoring and Consultanc Direct Evaluation Support y Services Selection. Services by Gokhale Time based 9 1 500 7,14,286 Institute of Politics Contract and Economics Management Consultanc Direct Information System y Services Selection. 10 1 543 7,75,714 Support from Tata Time based Trusts Contract # Activity Category Number Estimat Estimat Procurement of ed cost ed cost Methods Packag in INR, in USD es Rs Lakh (1 USD = Rs.70) Study of Consultanc Open constraints and y Services National, CQS development of Direct RFP. strategy for Lump Sum promoting Contract 11 exchange traded 1 50 71,429 instruments for price risk mitigation by CBOS Basic Price Studies Consultanc Open for Market y Services National, CQS; 12 Intelligence Cell 1 80 1,14,286 Direct RFP Lump Sum Contract Consultanc Open y Services National, CQS 13 Internal auditor 1 50 71,429 Direct RFP Lump Sum Contract PROCUREMENT India : State of Maharashtra's Agribusiness and Rural Transformation Project PLAN General Information Country: India 2019-01-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P168310 GPN Date: 2018-12-24 Project Name: State of Maharashtra's Agribusiness and Rural Transformation Project Loan / Credit No: IBRD / 90310, / Project Coordination Management Unit (PCMU-SMART) Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SMART/PIU-MSWC/WORKS/5 National Procure 3/2022-23 / Construction of D ment Document - Component C: Building Risk Single Stage - Two E Under Imple 2024-01-2 ecentralized Warehouse for s IBRD / 90310 Post Request for Bids Open - National 2 Envelope proce 505,451.00 0.00 2023-02-23 2023-04-27 2023-02-28 2023-04-27 2023-04-11 2023-06-24 2023-07-29 Mitigation Mechanisms. nvelope mentation 5 mall enterprises/ FPOs Kanch ss (Non Bank-SPD ani Farmer Producer Co. Ltd. ) Chandrapur GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SMART/PCMU/GOODS/33/20 Component D: Project Mana 21-22 / Procurement of Comp Request for Quota Single Stage - One E IBRD / 90310 gement, Monitoring and Lea Post Open - National 38,724.00 0.00 Canceled 2021-08-04 2021-09-29 2022-03-28 uter Hardware & Software Ite tions nvelope rning. ms for PCMU SMART. SMART/PCMU/GOODS/37/20 Component D: Project Mana 21-22 / Procurement of Comp Single Stage - Two E IBRD / 90310 gement, Monitoring and Lea Post Request for Bids Open - National 110,015.71 0.00 Canceled 2021-11-30 2022-01-01 2021-12-05 2022-01-16 2022-02-17 2022-03-10 2022-06-08 uters and other computer har nvelope rning. dware peripherals SMART/PIU-MSWC/GOODS/4 7/2022-23 / Procurement of I T hardware to PIU-MSWC for i Component C: Building Risk Single Stage - Two E Under Imple IBRD / 90310 Post Request for Bids Open - National 428,812.00 0.00 2022-07-25 2023-02-02 2022-07-30 2023-03-20 2022-09-10 2022-10-24 2022-11-28 2023-01-27 mplementation of e-NWR usi Mitigation Mechanisms. nvelope mentation ng block chain under compon ent of strengthening wareho use receipt finance system. SMART/PCMU/PIU-MSAMB/G OODS/50/2022-23 / Procure Component B: Expanding Ma Direct - Internation ment of D-Sight Software to IBRD / 90310 rket Access and Supporting Post Direct Selection 12,960.00 0.00 Signed 2022-12-24 2022-12-24 2023-01-03 2023-01-05 2023-01-27 2024-01-27 al access Priorities SPS investm Enterprise Growth. ents for Market Access (P-IM A)tool NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PCMU/NCS/35/2021-22 / To s elect CIRCOT, cotton testing l Component B: Expanding Ma aboratory of Government of I IBRD / 90310 rket Access and Supporting Post Direct Selection Direct 62,371.00 0.00 Canceled 2021-10-14 2021-10-29 2021-10-19 2021-11-02 2022-05-01 ndia for quality assessment o Enterprise Growth. f the FB bales made by CBO i n smart cotton project SMART/PCMU/NSC/41/2021- Component D: Project Mana 22 / Procurement of TALLY so Request for Quota Single Stage - One E IBRD / 90310 gement, Monitoring and Lea Post Open - National 97,792.99 39,563.34 Signed 2022-01-26 2022-03-23 2022-08-05 2027-01-06 ftware , customization and h tions nvelope rning. andholding support for SMAR T project. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SMART/PCMU/CS/01 / Consul tancy Services to identify the key Environmental and Socia Component A: Enhancing Ins l Issues and Challenges in rel titutional Capacity to Suppor Consultant Qualifi IBRD / 90310 Post Open - National 28,571.00 41,488.66 Signed 2019-01-22 2019-01-30 2019-02-05 2019-02-18 2019-02-21 2019-02-23 2019-03-08 2019-03-05 2019-03-11 2019-08-02 ation to the proposed project t Agricultural Transformation cation Selection locations, activities, intervent . ions and the related climatic vulnerabilities, by conducting detailed Environment and So cial Assess SMART/PCMU/CS/08/2019-20 / Institutional and Functional Review for Enhancing Institut Component A: Enhancing Ins ional Capacity for Agribusine titutional Capacity to Suppor Consultant Qualifi ss Reforms of Department of / Post Open - National 105,714.00 0.00 Signed 2019-09-07 2019-09-06 2019-09-07 2019-10-07 2019-09-09 2019-10-25 2020-09-23 2019-11-11 2020-04-09 t Agricultural Transformation cation Selection Agriculture (DOA) and Depart . ment of Marketing (DOM), Ma harashtra State. Direct Requ est for Proposal method of pr ocurement is selected. SMART/PCMU/CS/11/2019-20 / Study of constraints and de Component C: Building Risk Consultant Qualifi Under Implement velopment of strategy for pro / Post Open - National 71,429.00 0.00 2019-12-09 2019-12-18 2019-12-30 2020-01-14 2020-02-12 2020-01-11 2020-03-13 2020-09-17 2020-04-17 2020-10-14 Mitigation Mechanisms. cation Selection ation moting exchange traded inst ruments for price risk mitigat ion by CBOS. SMART/PCMU/CS/12/2019-20 Component C: Building Risk Consultant Qualifi / Basic Price Studies for Mark / Post Open - National 114,286.00 0.00 Canceled 2019-12-09 2019-12-30 2020-02-12 2020-03-13 2020-04-17 2020-10-14 Mitigation Mechanisms. cation Selection et Intelligence Cell SMART/PCMU/CS/13/2019-20 Component C: Building Risk Consultant Qualifi / Technical Consultancy Servi / Post Open - National 454,286.00 0.00 Canceled 2019-12-09 2019-12-30 2020-02-12 2020-03-13 2020-04-17 2020-10-14 Mitigation Mechanisms. cation Selection ces for Stewardship Councils Page 1 SMART/PCMU/CS/14/2019-20 Component D: Project Mana Consultant Qualifi / Appointment of Internal Au / gement, Monitoring and Lea Post Open - National 71,429.00 200,338.90 Signed 2019-11-13 2021-03-10 2019-12-04 2021-07-08 2020-01-17 2022-01-11 2020-02-16 2022-06-29 2020-03-22 2022-08-05 2020-09-18 cation Selection ditor for SMART Project. rning. SMART/PCMU/CS/15/2019-20 Component D: Project Mana Consultant Qualifi / Appointment of External Au IBRD / 90310 gement, Monitoring and Lea Post Open - National 14,285.00 24,133.91 Signed 2020-02-16 2020-03-24 2020-03-08 2021-07-08 2020-05-07 2021-09-28 2020-06-06 2021-12-11 2020-07-11 2021-12-15 2021-01-07 cation Selection ditor for SMART Project. rning. SMART/PCMU/CS/16/2019-20 Component D: Project Mana Consultant Qualifi / Appointment of Finance Co IBRD / 90310 gement, Monitoring and Lea Post Open - National 34,286.00 0.00 Canceled 2020-02-16 2020-02-25 2020-03-08 2020-09-04 2020-05-07 2020-06-06 2020-07-11 2021-01-07 cation Selection nsultant for SMART project. rning. SMART/PCMU/17/2020-21 / C Component C: Building Risk Consultant Qualifi ommodity Base Studies for IBRD / 90310 Post Open - National 111,034.00 0.00 Canceled 2020-04-17 2020-04-26 2020-05-08 2020-06-21 2020-07-21 2020-08-25 2021-02-21 Mitigation Mechanisms. cation Selection Market Intelligence and Supp ort component PCMU/SMART/CS/18/2020-21 Component B: Expanding Ma / Comprehensive Training for Consultant Qualifi IBRD / 90310 rket Access and Supporting Post Open - National 105,409.00 94,812.60 Signed 2020-05-07 2020-04-29 2020-05-28 2020-09-04 2020-07-11 2021-01-18 2020-08-10 2021-04-15 2020-09-14 2021-05-01 2021-03-13 CBOs and Gender Mainstrea cation Selection Enterprise Growth. ming for DOA Staff. SMART/PCMU/CS/19/2020-21 Component B: Expanding Ma / Bridge Technicla Support to Quality And Cost- IBRD / 90310 rket Access and Supporting Post Open - National 772,538.00 917,290.23 Signed 2020-05-07 2020-04-29 2020-05-28 2020-09-04 2020-07-11 2021-04-12 2020-08-08 2021-06-07 2020-09-07 2021-08-27 2020-10-12 2021-11-29 2020-11-16 2021-12-28 2021-11-16 CLFs and CMRCs Pakage 1 Vi Based Selection Enterprise Growth. darbha & Marathwada Regio n. SMART/PCMU/CS/20/2020-21 / Bridge Technical Support to Component B: Expanding Ma Quality And Cost- CLFs and CMRCs Pakage 2 N IBRD / 90310 rket Access and Supporting Post Open - National 683,773.00 911,469.28 Signed 2020-05-07 2020-04-29 2020-05-28 2020-09-04 2020-07-11 2021-04-12 2020-08-08 2021-06-07 2020-09-07 2021-08-27 2020-10-12 2021-12-29 2020-11-16 2022-03-17 2021-11-16 Based Selection orth Maharashtra, Konkna an Enterprise Growth. d Western Maharashtra Regi on. PCMU/SMART/CS/21/2020-21 Component D: Project Mana Quality And Cost- Open - Internationa IBRD / 90310 Prior 1,143,000.00 1,102,724.44 Signed 2020-06-04 2020-07-07 2020-06-25 2020-09-09 2020-08-08 2021-02-19 2020-09-05 2021-05-20 2020-10-05 2021-10-18 2020-11-09 2022-01-15 2020-12-14 2022-02-08 2021-12-14 / Monitoring & Evaluation Ag gement, Monitoring and Lea Based Selection l ency rning. SMART/PCMU/CS/23/2020-21 Component A: Enhancing Ins Quality And Cost- / Technical Service Provider f IBRD / 90310 titutional Capacity to Suppor Prior Open - National 708,355.00 1,063,347.75 Signed 2020-07-07 2020-07-07 2020-07-28 2020-09-04 2020-09-10 2021-02-11 2020-10-08 2021-04-19 2020-11-07 2021-07-29 2020-12-12 2022-01-09 2021-01-16 2022-02-19 2026-01-15 Based Selection or Commodity Stewardship C t Agricultural Transformation ouncil . SMART/PCMU/CS/24/2020-21 / Conduct baseline survey of various stakeholders, prepar Component B: Expanding Ma e strategy and action plan wi Consultant Qualifi IBRD / 90310 rket Access and Supporting Post Open - National 40,128.00 0.00 Canceled 2020-12-02 2021-06-25 2020-12-23 2021-07-08 2021-02-05 2021-03-07 2021-04-11 2021-10-08 th regards to training & capa cation Selection Enterprise Growth. city building, support tp PMC to organize capacity building & training workshops and to develop content of IEC tools. PCMU/SMART/CS/25/20-21 / Component D: Project Mana Consultant Qualifi IBRD / 90310 Post Open - National 80,914.00 186.66 Signed 2021-01-11 2021-01-19 2021-01-28 2021-03-13 2021-01-20 2021-04-12 2021-06-11 2021-05-17 2021-06-22 2021-11-13 Finance Consultancy for SMA gement, Monitoring and Lea cation Selection RT Project rning. SMART/PCMU/CS/03/2019-20 / Consulting Services for one Component C: Building Risk Quality And Cost- Open - Internationa IBRD / 90310 Prior 1,709,114.00 0.00 Canceled 2019-09-07 2019-12-20 2019-09-28 2020-01-02 2019-11-11 2020-03-16 2019-12-09 2020-06-08 2020-01-08 2020-08-07 2020-02-12 2020-03-18 2026-03-17 State Technical Support Grou Mitigation Mechanisms. Based Selection l p under the SMART. SMART/PCMU/CS/04/2019-20 / Consulting Services for Regi Component C: Building Risk Quality And Cost- Open - Internationa / Prior 2,063,314.00 0.00 Canceled 2019-09-07 2019-12-20 2019-09-28 2020-01-02 2019-11-11 2020-03-17 2019-12-09 2020-06-08 2020-01-08 2020-08-31 2020-02-12 2020-03-18 2026-03-17 onal Technical Support Group Mitigation Mechanisms. Based Selection l - 1 for Vidarbha Region under the SMART Project. SMART/PCMU/CS/05/2019-20 / Consulting Services for Regi Component C: Building Risk Quality And Cost- Open - Internationa / Prior 2,063,314.00 0.00 Canceled 2019-09-07 2019-11-05 2019-09-28 2020-01-02 2019-11-11 2020-03-17 2019-12-09 2020-06-08 2020-01-08 2020-08-31 2020-02-12 2020-03-18 2026-03-17 onal Technical Support Group Mitigation Mechanisms. Based Selection l - 2 for Marathwada Region u nder the SMART Project SMART/PCMU/CS/06/2019-20 / Consulting Services for Regi Component C: Building Risk Quality And Cost- Open - Internationa onal Technical Support Group / Prior 2,063,314.00 0.00 Canceled 2019-09-07 2019-11-05 2019-09-28 2020-01-02 2019-11-11 2020-03-17 2019-12-09 2020-06-08 2020-01-08 2020-08-31 2020-02-12 2020-03-18 2026-03-17 Mitigation Mechanisms. Based Selection l - 3 for Western Maharashtra Region under the SMART Proj ect SMART/PCMU/CS/07/2019-20 / Consulting Services for Regi Component C: Building Risk Quality And Cost- Open - Internationa onal Technical Support Group / Prior 2,063,314.00 0.00 Canceled 2019-09-07 2019-11-05 2019-09-28 2020-01-02 2019-11-11 2020-03-17 2019-12-09 2020-06-08 2020-01-08 2020-08-31 2020-02-12 2020-03-18 2026-03-17 Mitigation Mechanisms. Based Selection l - 4 for North Maharashtra & K onkan Region under the SMA RT Project. SMART/PCMU/CS/30/2021-22 / Detailed Study to identify fa cilities required for export inf Component B: Expanding Ma rastructure in the State of Ma Consultant Qualifi IBRD / 90310 rket Access and Supporting Post Open - National 57,143.00 53,517.62 Signed 2021-06-30 2021-07-12 2021-07-21 2021-07-27 2021-09-03 2021-11-01 2021-10-03 2022-06-07 2021-11-07 2022-07-05 2022-05-06 harashtra by using P-IMA tool cation Selection Enterprise Growth. developed by Standard and T rade Development Facility(ST DF) of World Trade Organizat ion (WTO) SMART/PCMU/CS/31/2021-22 / Consultancy Services for Up Component B: Expanding Ma Consultant Qualifi gradation of Slaughterhouse IBRD / 90310 rket Access and Supporting Post Open - National 57,143.00 0.00 Signed 2021-06-30 2021-07-12 2021-07-21 2021-07-27 2021-09-03 2022-05-10 2021-10-03 2023-03-31 2021-11-07 2022-05-06 cation Selection as per standards of APEDA & Enterprise Growth. Capacity Building for Clean M eat Production SMART/PCMU/CS/28/2021-22 Component A: Enhancing Ins Quality And Cost- Open - Internationa / Selection of System Integra IBRD / 90310 titutional Capacity to Suppor Prior 1,565,714.00 0.00 Canceled 2021-07-05 2021-07-21 2021-07-26 2021-08-03 2021-09-08 2021-10-06 2021-11-05 2021-12-10 2022-01-14 2023-07-13 Based Selection l tor for DOA & SMART MIS t Agricultural Transformation . SMART/PCMU/CS/27/2021-20 Component A: Enhancing Ins 22 / Hiring of Human Resourc titutional Capacity to Suppor Quality And Cost- Open - Internationa IBRD / 90310 Prior 16,517,283.00 11,523,118.65 Signed 2021-06-30 2021-07-26 2021-07-21 2021-07-28 2021-09-03 2022-02-03 2021-10-01 2022-03-10 2021-10-31 2022-07-11 2021-12-05 2022-08-08 2022-01-09 2022-09-09 2027-03-31 es cum Placement Agency fo t Agricultural Transformation Based Selection l r SMART Society . SMART/PCMU/CS/29/2021-22 Component B: Expanding Ma Quality And Cost- Open - Internationa / Consultancy Services for Pr IBRD / 90310 rket Access and Supporting Prior 1,078,014.00 0.00 Canceled 2021-07-05 2021-07-26 2021-09-08 2021-10-06 2021-11-05 2021-12-10 2022-01-14 2024-01-14 Based Selection l oject Management Support t Enterprise Growth. o PIU Mahacot PCMU/CS/34/2021-22 / Proje Component B: Expanding Ma Consultant Qualifi ct Management Support to S IBRD / 90310 rket Access and Supporting Post Open - National 62,371.00 0.00 Canceled 2021-09-30 2021-10-06 2021-10-21 2022-01-14 2021-12-04 2022-01-03 2022-02-07 2022-08-06 cation Selection MART's Project Implementati Enterprise Growth. on Unit Maha Cot. SMART/PCMU/CS/38/2021-22 Component A: Enhancing Ins Quality And Cost- Open - Internationa / Selection of System Integra IBRD / 90310 titutional Capacity to Suppor Prior 2,743,658.01 0.00 Signed 2021-12-15 2022-01-14 2022-01-05 2022-02-03 2022-03-25 2022-03-05 2022-05-25 2022-04-04 2022-07-11 2022-05-09 2022-09-02 2022-06-13 2025-05-28 Based Selection l tor for DOA & SMART MIS t Agricultural Transformation . Page 2 SMART/PCMU/CS/40/2021-22 Component B: Expanding Ma / Hiring of Service Provider fo Quality And Cost- IBRD / 90310 rket Access and Supporting Post Open - National 497,814.29 0.00 Canceled 2022-01-27 2022-05-31 2022-02-17 2022-04-02 2022-04-30 2022-05-30 2022-07-04 2022-08-08 2028-01-24 r Business Development Serv Based Selection Enterprise Growth. ices (BDS) to selected enterp rises SMART/PCMU/CS/42/2021-22 / Selection of consultancy fir Component C: Building Risk Consultant Qualifi IBRD / 90310 Post Open - National 83,386.00 0.00 Canceled 2022-03-21 2022-03-11 2022-04-11 2022-05-25 2022-06-24 2022-07-29 2023-01-25 m for feasibility study for logi Mitigation Mechanisms. cation Selection stic hub on Samrudhi Maham arg under PIU-MSWC SMART/PCMU/CS/44/2022-23 / Conduct baseline survey of various stakeholders, prepar Component B: Expanding Ma e strategy and action plan wi Consultant Qualifi IBRD / 90310 rket Access and Supporting Post Open - National 40,128.00 0.00 Canceled 2022-04-10 2022-04-25 2022-05-19 2022-06-18 2022-07-02 2023-12-21 th regards to training & capa cation Selection Enterprise Growth. city building, support tp PMC to organize capacity building & training workshops and to develop content of IEC tools. SMART/PCMU/CS/45/2022-23 / Direct RFP : Conduct baseli ne survey of various stakehol Component B: Expanding Ma ders, prepare strategy and a Quality And Cost- IBRD / 90310 rket Access and Supporting Post Open - National 40,128.00 0.00 Canceled 2022-06-06 2022-06-06 2022-07-06 2022-07-25 2022-07-08 2022-07-13 2022-07-28 2022-08-17 2022-09-16 2024-08-06 ction plan with regards to trai Based Selection Enterprise Growth. ning & capacity building, sup port to PMC to organize capa city building & training works hops and to develop content of IEC tools. SMART/PCMU/CS/46/2022-23 / Direct RFP:Selection of cons Component B: Expanding Ma Quality And Cost- ultancy firm for feasibility stu IBRD / 90310 rket Access and Supporting Post Open - National 83,386.00 0.00 Signed 2022-06-12 2022-06-06 2022-07-12 2022-06-14 2022-07-22 2022-06-15 2022-07-27 2022-08-12 2022-08-11 2022-11-01 2022-08-31 2022-12-20 2022-09-25 2023-01-23 Based Selection dy for logistic hub on Samrud Enterprise Growth. hi Mahamarg under PIU-MSW C SMART/PCMU/PIU-MSRLM/CS Component B: Expanding Ma /49/2022-23 / Hiring of Servic Quality And Cost- Under Implement IBRD / 90310 rket Access and Supporting Post Open - National 875,357.14 0.00 2022-12-09 2022-12-03 2022-12-30 2023-03-29 2023-02-12 2023-03-12 2023-04-11 2023-05-16 2023-06-20 2025-06-19 e Provider for Business Devel Based Selection ation Enterprise Growth. opment Services (BDS) to sel ected enterprises INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SMART/PCMU/CS/02/2019-20 / The rating of FPO using stan dardised rating would guide t Component B: Expanding Ma ailored capacity-building sup / rket Access and Supporting Post Direct Selection Direct 20,702.17 23,808.19 Signed 2019-08-17 2019-04-24 2019-08-22 2019-05-24 2019-09-16 2019-09-17 2019-12-15 port to FPOs and facilitate ac Enterprise Growth. cess to credit from formal fin ancial institutions as part of project interventions. PCMU/SMART/CS/22/2021 / Development of RFP for MIS Component A: Enhancing Ins and providing transaction ad titutional Capacity to Suppor IBRD / 90310 Post Direct Selection Direct 93,000.00 91,313.55 Signed 2020-06-19 2020-09-02 2020-06-29 2020-12-22 2020-09-02 2021-03-23 2021-03-01 visory services for procurem t Agricultural Transformation ent of System Integrator to b . uild digital MIS for the Depart ment of Agriculture and SMA RT Project. PCMU/SMART/CS/26/2021-22 Component D: Project Mana / Appointment of short term IBRD / 90310 gement, Monitoring and Lea Post Direct Selection Direct 1,685.00 846.19 Signed 2021-02-12 2021-02-16 2021-02-22 2021-02-25 2021-04-28 2021-03-16 2021-10-25 External Audit consultancy fo rning. r FY 2018-2019 and FY 2019- 2020 PCMU/SMART/ICS/27/2020-2 1 / Appointment of Individual Component C: Building Risk Individual Consult Consultant for preparation of IBRD / 90310 Post Limited 9,861.00 0.00 Signed 2021-02-18 2021-02-25 2021-02-23 2021-03-25 2021-03-16 2021-06-07 2021-04-20 2021-10-17 Mitigation Mechanisms. ant Selection feasibility report on establish ment of two grain silo plants. PCMU/SMART/CS/32/2021-22 Component A: Enhancing Ins / Millets Value Chain Develop titutional Capacity to Suppor Pending Impleme ment & Establishment of Cen IBRD / 90310 Prior Direct Selection Direct 1,131,429.00 0.00 2021-06-30 2021-07-10 2021-09-13 2022-03-12 t Agricultural Transformation ntation ter of Excellence(CoE) with In . dian Institute of Millet Resear ch (IIMR) PCMU/CS/33/2021-22 / Appoi ntment of Individual Consulta Component C: Building Risk Individual Consult IBRD / 90310 Post Direct 30,857.00 0.00 Signed 2021-09-30 2021-10-06 2021-10-10 2021-09-30 2021-10-18 2021-11-25 2021-11-03 2022-11-03 nt for Development of Market Mitigation Mechanisms. ant Selection Intelligence Cell & Risk Mitiga tion Cell for SMART. PCMU/SMART/CS/36/2021 / S election of Service Provider f Component C: Building Risk or Implementation of Digital IBRD / 90310 Post Direct Selection Direct 395,927.01 0.00 Signed 2021-10-29 2021-11-09 2021-11-12 2022-07-14 2021-12-14 2027-03-31 Mitigation Mechanisms. Warehouse Receipt Finance using Block chain Technology at PIU, MSWC SMART/PCMU/ICS/39/2021-2 2 / Empanelment of Experts i Component B: Expanding Ma Individual Consult n the field of Value Chain for IBRD / 90310 rket Access and Supporting Prior Open 428,571.43 0.00 Canceled 2022-01-21 2022-01-31 2022-02-24 2022-03-11 2022-04-15 2025-11-01 ant Selection technical evaluation of sub-p Enterprise Growth. rojects under SMART Project. SMART/PCMU/CS/43/2021-22 Component B: Expanding Ma / Selection of consultancy fir IBRD / 90310 rket Access and Supporting Post Direct Selection Direct 185,714.00 71,484.11 Signed 2022-03-21 2022-03-26 2022-03-27 2022-04-11 2022-04-11 2022-05-13 2022-08-09 m for technical and financial Enterprise Growth. evaluation of FPP submitted by CBOs. SMART/PIU-MAHACOT/CS/48/ 2022-23 / Providing Professio Component B: Expanding Ma nal Services of Central Institu IBRD / 90310 rket Access and Supporting Post Direct Selection Direct - National 867,142.86 0.00 Signed 2022-10-09 2022-09-21 2022-10-15 2022-11-10 2022-11-11 2027-03-31 te for Research on Cotton Te Enterprise Growth. chnology (CIRCOT) for Devel opment of Cotton Value Chai n in Maharashtra SMART/PCMU/PIU-MAHACOT/ ICS/50/2022-23 / Selection of Component B: Expanding Ma Individual Consult individual Consultant for for IBRD / 90310 rket Access and Supporting Post Open - National 8,427.73 0.00 Signed 2022-12-19 2022-12-09 2023-01-22 2023-04-05 2023-01-27 2023-04-12 2023-02-02 2023-06-07 ant Selection mation of Special Purpose Ve Enterprise Growth. hicle (SPV) in Smart Cotton P roject. Page 3 SMART/PCMU/PIU-MAHACOT/ ICS/51/2022-23 / Selection (A Component B: Expanding Ma Individual Consult Under Implement s individual Consultant) Legal IBRD / 90310 rket Access and Supporting Post Open - National 3,895.71 0.00 2023-01-29 2023-01-19 2023-02-27 2023-03-06 2023-03-16 2024-03-15 ant Selection ation Expert for Drafting and Vetti Enterprise Growth. ng of Documents under SMA RT Project SMART/PCMU/PIU-VSTF/ICS/5 2/2022-23 / Hiring of Practici ng Company Secretary (Sole Component C: Building Risk Individual Consult Proprietor) as individual cons IBRD / 90310 Post Open - National 6,007.89 0.00 Signed 2023-02-16 2023-02-02 2023-03-22 2023-03-31 2023-03-29 2023-03-31 2023-04-12 2025-08-23 Mitigation Mechanisms. ant Selection ultant for registration of Com modity Stewardship Council ( CSC) -6 Nos under Section 8 of Companies Act 2013. SMART/PCMU/PIU-PMC/ICS/5 Component B: Expanding Ma 5/2022-23 / Selection of Advi Individual Consult Under Implement IBRD / 90310 rket Access and Supporting Post Open - National 9,000.00 0.00 2023-04-05 2023-03-12 2023-05-24 2023-06-08 2023-06-28 2023-12-25 sory Consultant for IEC activi ant Selection ation Enterprise Growth. ties for Urban Food Pilot SMART/PCMU/CS/DS/54/202 Component A: Enhancing Ins 2-23 / Development of Staff t titutional Capacity to Suppor Under Implement raining management plan an IBRD / 90310 Post Direct Selection Direct - National 31,428.57 0.00 2023-04-30 2023-05-03 2023-05-10 2023-06-09 2023-09-07 t Agricultural Transformation ation d recommendations for refor . ms of Department of Agricult ure (DOA) SMART/PCMU/CS/DS/55/202 Component A: Enhancing Ins 3-24 / Providing facilities and titutional Capacity to Suppor Under Implement IBRD / 90310 Post Direct Selection Direct - National 347,867.86 0.00 2023-05-03 2023-05-12 2023-05-13 2023-06-17 2024-06-16 Services for Training & capac t Agricultural Transformation ation ity Building of DoM field offic . ers and APMCs staff SMART/PCMU/CS/DS/56/202 Component A: Enhancing Ins 3-24 / To engage an incubati titutional Capacity to Suppor Under Implement on center for FPCs by SRDF N IBRD / 90310 Post Direct Selection Direct - National 16,457.14 0.00 2023-05-18 2023-05-29 2023-05-28 2023-06-25 2023-12-22 t Agricultural Transformation ation asik for strengthening of Tec . hnical Assistance to FPCs Fin anced under Smart Project Page 4 Republic of Malawi Ministry of Education, Science and Technology Private Bag 328 Lilongwe 3 PROCUREMENT PLAN For PROJECT PREPARATORY ADVANCE (PPA) Name of Project: Skills for A Vibrant Economy (SAVE) Loan No./Credit No./Grant No.: P172627 Financiers: World Bank Implementing Agency: Ministry of Education, Science & Technology Beneficiary Institutions: Ministry of Education, Science & Technology Ministry of Labour Ministry of Youth TEVETA NCHE Ministry of Gender Selected Public Universities SAVE PROJECT PPA PROCUREMENT PLAN I. General 1.Project information Country: Malawi Project Name: Skills for A Vibrant Economy (SAVE) Project ID: P172627 2.Project Implementation Agency: Ministry of Education Science and Technology 3.Date of the Procurement Plan: June 22, 2020 4.Period covered by this Procurement Plan: June 2020 to November 2021 II. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. III. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. IV. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in The Public Procurement and Disposal of Assets Act, 2017 and its subsidiary instruments namely: The Public Procurement Regulations, 2004, Desk Instructions (2005), Standard bidding Documents and Circulars for the Public Procurement and Disposal of Assets (PPDA) Authority such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations under the following conditions: o Provision of “set-asides” contracts for small enterprises shall not be applied. o Criteria such as environmental aspect, extent of local content, technology transfer, and managerial, scientific & operational skills development shall not be used in the evaluation of bids unless specifically agreed by the Bank on case to case basis. o Procurement Documents include provisions, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. In accordance with paragraph 5.4(c) and 5.5 of the Procurement Regulations, the request for bids/request for proposals/request for quotations document shall require that Bidders/Proposers submitting Bids/Proposals/quotations present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. The form of the Letter of Acceptance is attached in Appendix 1. V. Prequalification: Not expected for works/goods packages in the procurement plan. VI. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable VII. Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. VIII. Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable for those contracts identified in the Procurement Plan tables; Works: Not Applicable for those contracts identified in the Procurement Plan tables. IX. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations: Not Applicable. X. Proposed Procedures for CDD Components: Not Applicable XI. Other Relevant Procurement Information: None XII. Reference to (if any) Project Operational/Procurement Manual: The Ministry of Education Science and Technology (MoEST) team will prepare Procurement manual. The Procurement Plan will also form part of the Project Implementation Manual. XIII. Procurement Approach and Prior Review Thresholds: The Procurement Arrangements as indicated in the below table will be used. The thresholds for the Bank’s prior review requirements are also provided in the table: Prior-review Thresholds for Procurement Methods Thresholds Procurem Substanti Works Goods, IT & Non-Consulting Shortlist of National ent al Services Consultants Type Risk ($`000) Works 10,000 Open Request Request Engineerin Internatio for for Open Open Open Consultin g& nal or Quotatio Quotatio National internatio National g Constructio n or n or or NCB nal or ICB or NCB Services n ICB National National ($'000) ($'000) ($'000) ($'000) Supervision ($'000 Shopping Shopping ($'000) ($'000) ($'000) Goods, IT 2,000 & Non- Consulting ≧ < ≦ ≧ < ≦ < ≦ Services Consultan 1,000 ts (Firms) 7,000 7,000 200 1,000 1,000 100 200 300 Individual 300 Consultan ts *These prior review thresholds are for the purposes of the initial procurement plan for the first 18 months. The thresholds will be revised periodically based on re-assessment of risks. All contracts not subject to prior review will be post-reviewed. Procurement Packages/Plan with Procurement Arrangements and Time Schedule: as per the table below: b) PROCUREMENT PLAN A. Works There are no envisaged works under the PPA. 1 2 3 4 5 6 7 8 9 10 Ref. Contract Estimat Market Selecti Prequ Domesti Revie Expect Expecte No. Description ed Approa on alifica c w ed bid d Cost ch Method tion Prefere by openin Contrac US$ (yes/n nce Bank g date t o) (yes/no) (Prior Signatu / Post) re Date 1. N/A B. Goods and Non-Consulting Services 1 2 3 4 5 6 7 8 9 10 Ref. Contract Estimat Market Selecti Prequ Domesti Revie Expect Expecte No. Description ed Approa on alifica c w ed bid d Cost ch Method tion Prefere by openin Contrac US$ (yes/n nce Bank g date t o) (yes/no) (Prior Signatu / Post) re Date 1. Procurement of 1 motor 75,000.0 Limited RFQ No No Post 21-Jul- 21-Aug- vehicle (4 x 4 Twin Cab 0 20 20 Vehicles) for the PIU 2. Procurement of various 85,500.0 Limited RFQ No No Post 21-Jul- 21-Aug- ICT Items: Computer 0 20 20 laptops, Computer Desktops, Photocopier, printers, cameras, Flash discs, Anti-virus, MS package, Extension cables, Extension cables 3. Procurement of 187,000. Open RFB No No Post 1-Aug- 1-Oct-20 Teleconferencing 00 National 20 equipment and licences under COVID- 19 support 4. Procurement of 14,500.0 Limited RFQ No No Post 1-Aug- 31-Aug- Internet modems 0 20 20 devices under COVID- 19 support 5. Procurement of Hand 7,000.00 Limited RFQ No No Post 1-Aug- 31-Aug- sanitizers, face 20 20 masks/shields and gloves under COVID-19 support C. Consultancy Services 1 2 3 4 5 6 7 8 9 10 Ref. Contract Estimat Market Selecti Evalua Shortli Review Review Expecte No. Description ed Approa on tion sting by by Bank d bid Cost ch Method Option (yes/n Bank (Prior / opening US$ o) (Prior / Post) date Post) 1. Consultancy service to 46,000. Open INDV No No Post 1-Aug-20 7-Sep-20 develop Project 00 Implementation Manual 2. Consultancy service to 86,000. Open CQS Rated No Post 1-Aug-20 7-Sep-20 carry out Environmental 00 National Social Safeguard studies-ESMF, SEP, ESMCP, P4R (Firm) 3. Hiring of Project 64,000. Open INDV No No Post 1-Aug-20 7-Sep-20 Manager 00 4. Hiring of Financial 48,000. Open INDV No No Post 1-Aug-20 7-Sep-20 Management Specialist 00 5. Hiring of Procurement 48,000. Open INDV No No Post 1-Aug-20 7-Sep-20 Specialist 00 6. Hiring of M & E Specialist 48,000. Open INDV No Post 1-Aug-20 7-Sep-20 00 7. Hiring of 48,000. Open INDV No Post 1-Aug-20 7-Sep-20 Communications 00 Specialist 8. Hiring of Social 48,000. Open INDV No Post 1-Oct-20 15-Nov- Safeguards Specialist 00 20 9. Hiring of Environmental 48,000. Open INDV No Post 31-Jan- 15-Mar- Specialist 00 21 21 10. Consultancy Service to 92,000. Open CQS Rated No Post 28-Feb- 15-Apr- conduct a Skills Needs 00 National 21 21 Assessment (Firm) 11. Consultancy to 60,000. Open CQS Rated No Post 1-Oct-20 15-Nov- conceptualize a holistic, 00 National 20 integrated ICT-based structure that details elements related to M&E (including EMIS), labor market information and integration platform, communications channels, and mobile- based activities (Firm) 12. Consultant on Dual 53,000. Open CQS Rated No Post 28-Feb- 15-Apr- Learning -Engage, 00 National 21 21 Inception reports, sensitization meetings and advertisements, Engage Partner organizations to participate in the programme, Engage and Train Master Trainers, Build capacity of the key staff in the project, Benchmark Dual Learning, Pilot Dual learning with STC, LTC, MZTC (Firm) 13. Consultancy Service to 75,000. Open CQS Rated No Post 21-Oct- 28-Nov- conduct assessment of 00 National 20 20 ODeL requirements (infrastructure for Higher Education Institutions (HEI) and Technical and Vocational Education) in TEVET institutions (Firm) 14. Consultancy Services on 33,000. Open INDV No Post 1-Aug-20 22-Sep- proposal development 00 20 for tertiary institutions such as TEVET Providers, Nalikule and DCE 15. RFQ – Request for Quotations; CQS - Consultant’s Qualification-based Selection; QCBS – Quality and Cost-based Selection and; INDV - Individual Consultant Selection. Appendix 1 Letter of Acceptance of the World Bank’s Anti-Corruption Guidelines and Sanctions Framework Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines1 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, , are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or 1Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. in any other manner;2 (ii) to be a nominated3 sub-contractor, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect4 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Consultant: 2 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification, expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 3 A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the particular bidding document) is one which has been: (i) included by the bidder in its pre-qualification application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 4 Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. Title of the person signing the Letter: PROCUREMENT Malawi : Skills for A Vibrant Economy Project PLAN General Information Country: Malawi 2022-09-05 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P172627 GPN Date: 2021-09-24 Project Name: Skills for A Vibrant Economy Project Loan / Credit No: IDA / D8220, IDA / 68910 University of Malawi Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Request for Bids - MW-UNIMA-312388-CW-RFB Supporting Increased Access Single Stage - One E Small Works SPD 2024-05-1 / Construction of teaching Co IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 3,520,000.00 0.00 Canceled 2023-01-07 2023-04-23 2023-01-12 2023-05-12 2023-02-16 2023-03-18 2023-04-06 nvelope (1 envelope proce 8 mplex ms in Higher Education ss) Request for Bids - MW-UNIMA-312388-CW-RFB. Supporting Increased Access Single Stage - One E Small Works SPD Pending Imp 2024-03-0 / Construction of teaching Co IDA / 68910 to Skills Development Progra Post Request for Bids Open - National 3,500,000.00 0.00 2023-07-30 2023-08-08 2023-09-08 2023-09-15 2023-11-03 nvelope (2 envelope proce lementation 8 mplex ms in Higher Education ss) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-UNIMA-312423-GO-RFB / ICT Equipment for ODEL, IC Supporting Increased Access T Equipment for Metropolitan Single Stage - One E Under Imple IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 390,000.00 0.00 2022-09-30 2022-10-18 2022-10-07 2022-10-10 2022-10-25 2022-11-18 2022-12-07 Area Network; laptop comput nvelope mentation ms in Higher Education ers, photocopier machines, g uillotine machine, wire stitchi ng machine, blocking machin e, MW-UNIMA-312472-GO-RFB Supporting Increased Access Single Stage - One E Under Imple / Identity Management Syste IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 120,000.00 0.00 2022-10-15 2023-06-16 2022-10-22 2022-12-03 2023-01-02 2023-02-06 2023-08-05 nvelope mentation m; ms in Higher Education MW-UNIMA-312473-GO-RFQ Supporting Increased Access Request for Quota Single Stage - One E Under Imple / Office Equipment; Filling ca IDA / D8220 to Skills Development Progra Post Open - National 85,000.00 0.00 2022-09-20 2022-10-20 2022-11-22 2023-05-21 tions nvelope mentation binet, ms in Higher Education MW-UNIMA-312471-GO-RFB / ICT Aids for Persons with Sp Supporting Increased Access Single Stage - One E Under Imple ecial Needs; screen reader, Z IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 65,000.00 0.00 2022-09-30 2022-10-16 2022-10-05 2022-11-16 2022-12-16 2023-01-06 2023-07-05 nvelope mentation oom texts, text to speech co ms in Higher Education mputers, text telephone. MW-UNIMA-312422-GO-RFQ Supporting Increased Access Request for Quota Single Stage - One E Pending Impl / Access control system Soft IDA / D8220 to Skills Development Progra Post Open - National 40,000.00 0.00 2023-12-24 2024-01-16 2024-02-15 tions nvelope ementation ware; ms in Higher Education MW-UNIMA-312470-GO-RFB Supporting Increased Access / Teaching and Learning Equi Single Stage - One E Pending Impl IDA / D8220 to Skills Development Progra Post Request for Bids Open - National 400,000.00 0.00 2024-12-10 2024-12-15 2024-12-22 2025-01-21 2025-02-18 2025-08-17 pment; laboratories equipme nvelope ementation ms in Higher Education nt, tool kit for laboratories, NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MW-UNIMA-312457-CS-CDS / Supporting Increased Access Consultancy Services for Con IDA / D8220 to Skills Development Progra Post Direct Selection Direct - National 200,000.00 0.00 Canceled 2022-09-20 2022-10-16 2022-09-30 2022-11-04 2023-01-18 struction Supervision of teac ms in Higher Education hing complex MW-UNIMA-312457-CS-CDS. Supporting Increased Access Under Implement / Consultancy Services for Co IDA / D8220 to Skills Development Progra Post Direct Selection Direct - National 200,000.00 0.00 2022-11-30 2022-12-09 2022-12-07 2023-01-16 2024-01-16 ation nstruction Supervision of tea ms in Higher Education ching complex MW-UNIMA-337049-CS-CDS / Consultancy service for supe Supporting Increased Access Under Implement rvision and contract manage IDA / D8220 to Skills Development Progra Post Direct Selection Direct - National 200,000.00 0.00 2023-01-24 2023-02-03 2023-01-31 2023-02-17 2023-03-12 2024-03-11 ation ment of construction of teac ms in Higher Education hing and learning centre Page 1 Sample Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan [This is the first procurement plan) 2. Date of General Procurement Notice: April 25, 2017 3. Period covered by this procurement plan: September 2016 to June 2017 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 1,500,000 All 2. NCB (Goods) NA 3. ICB (Works) Above US$ 7 million All 4. NCB (Works) NA 5. ICB and LIB (Non-Consultant Above US$ 1,500,000 All Services) 6 NCB (Non-Consultant Services) NA [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [CDD project implementation Manual to be issued by DRDIP PIU, MoANR for Bank approval) 4. Reference to (if any) Project Operational/Procurement Manual: DRDIP Procurement Manual to be issued by DRDIP PIU. 5. Any Other Special Procurement Arrangements: NA 6. Summary of the Procurement Packages planned during the first 18 July 9, 2010 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) million (yes/ no) Summary NA NA NA NA of the ICB (Works) Summary 6.69 4 No Prior of the ICB (Goods) Summary 3.8 9 No Post All of the NCB (Works) Summary 14.70 14 No Post All of the NCB (Goods) Summary NA NA NA NA of the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Commentes Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) All 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: NA July 9, 2010 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) million Summary 0.35 2 Prior of number of contracts that will be let under QCBS Summary 1.4 38 Post LCS/ IC of number of contracts that will be let under other methods July 9, 2010 PROCUREMENT Eastern and Southern Africa : Development Response to Displacement Impacts Project in the HoA PLAN General Information Country: Eastern and Southern Africa 2017-06-30 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P152822 GPN Date: Project Name: Development Response to Displacement Impacts Project in the HoA Loan / Credit No: IDA / D1200 Intergovernmental Authority on Development Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-IGAD-55145-GO-RFQ / Pro Regional Support for Coordin curement of GIS tools (Adobe Request for Quota Single Stage - One E IDA / D1200 ation, Capacity and Knowled Post Limited 2,500.00 2,805.01 Completed 2018-04-03 2018-03-05 2018-05-29 2018-04-26 2018-11-25 2018-05-22 Creative Crowd and GPSMAP tions nvelope ge 64s (Handheld GPS Kits)) DJ-IGAD-55119-GO-DIR / Pro Regional Support for Coordin IDA / D1200 Post Direct Selection Direct 20,000.00 12,342.40 Completed 2018-05-02 2018-03-09 2018-05-07 2018-04-03 2018-06-11 2018-05-29 2018-12-08 2018-06-11 curement of GIS Application ( ation, Capacity and Knowled ArcGIS) ge DJ-IGAD-163872-GO-RFQ / Pr Regional Support for Coordin ocurement of Mobile Phones Request for Quota Single Stage - One E IDA / D1200 ation, Capacity and Knowled Post Limited 7,000.00 4,800.00 Completed 2020-03-29 2021-09-26 2020-05-15 2020-11-04 2020-06-15 2021-01-21 for Geo-tagging of Developm tions nvelope ge ent Investments in Participati ng Countries DJ-IGAD-97346-GO-RFQ / Off Regional Support for Coordin Request for Quota Single Stage - One E ice Equipment (Replacement IDA / D1200 ation, Capacity and Knowled Post Limited 10,000.00 8,099.99 Completed 2021-03-06 2021-03-24 2021-04-10 2021-03-25 2021-05-10 2021-04-29 tions nvelope of Laptops) ge DJ-IGAD-285802-GO-RFQ / Pr Regional Support for Coordin Request for Quota Single Stage - One E Under Imple IDA / D1200 Post Limited 13,000.00 0.00 2022-04-19 2022-08-24 2022-05-12 2022-06-11 ocurement of IT Equipment ation, Capacity and Knowled tions nvelope mentation ge NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual DJ-IGAD-163865-NC-FCA / Pr Regional Support for Coordin Request for Quota Single Stage - One E IDA / D1200 Post Open - National 80,000.00 0.00 Canceled 2020-04-20 2020-06-10 2021-09-30 ocurement of editing service ation, Capacity and Knowled tions nvelope s ge DJ-IGAD-163248-NC-RFQ / Fr Regional Support for Coordin Request for Quota Single Stage - One E amework Agreement for the IDA / D1200 ation, Capacity and Knowled Post Limited 32,000.00 0.00 Canceled 2020-04-25 2020-06-20 2021-06-19 tions nvelope Provision of Videography Ser ge vices DJ-IGAD-163252-NC-RFQ / P Regional Support for Coordin Request for Quota Single Stage - One E ublication for Regional Scient IDA / D1200 ation, Capacity and Knowled Post Limited 20,000.00 0.00 Canceled 2020-04-25 2020-06-20 2020-12-17 tions nvelope ific Conference (2019) Papers ge DJ-IGAD-163870-NC-RFQ / Pr Regional Support for Coordin Request for Quota Single Stage - One E IDA / D1200 Post Limited 2,500.00 0.00 Canceled 2020-05-06 2020-07-01 2020-09-01 ocurement of Satellite Image ation, Capacity and Knowled tions nvelope ry ge CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IGAD/ DRDIP/CS/8 / Consulta Regional Support for Coordin ncy for the Commissioning of Quality And Cost- Open - Internationa IDA / D1200 ation, Capacity and Knowled Post 100,000.00 0.00 Canceled 2017-09-04 2017-09-25 2017-11-08 2017-12-06 2018-01-05 2018-02-09 2018-03-16 2019-03-16 Joint Research On Displacem Based Selection l ge ent & Development IGAD/ DRDIP/CS/9 / Consulta ncy to strengthen Monitoring Mechanism on Mixed Migrati Regional Support for Coordin Quality And Cost- Open - Internationa on, Migration Trends and the IDA / D1200 ation, Capacity and Knowled Prior 500,000.00 0.00 Canceled 2017-09-01 2017-09-22 2017-11-05 2017-12-03 2018-01-02 2018-02-06 2018-03-13 2019-03-13 Based Selection l Assessment of the impact of ge intervention in the 3 Project Countries on Forced Displace ment & Mixed Migration IGAD/ DRDIP/CS/10 / Consult Regional Support for Coordin Consultant Qualifi ancy for the Development of IDA / D1200 ation, Capacity and Knowled Post Open - National 5,000.00 5,000.00 Completed 2017-07-03 2018-05-11 2017-07-24 2017-09-06 2017-10-24 2017-10-06 2017-11-06 2017-11-10 2017-12-15 2018-05-09 2018-03-23 cation Selection DRDIP Regional Secretariat ge Website DJ-IGAD-163231-CS-CQS / C onsultancy to facilitate organ Regional Support for Coordin izing of market place event o Consultant Qualifi Open - Internationa IDA / D1200 ation, Capacity and Knowled Post 45,000.00 0.00 Canceled 2020-04-15 2020-04-30 2020-06-13 2020-07-13 2020-08-17 2020-10-16 n innovation and technologic cation Selection l ge al solutions in addressing cha llenges of forced displaceme nt INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IGAD/ DRDIP/CS/7 / Recruitm Regional Support for Coordin Individual Consult ent of Consultant for Capacit IDA / D1200 ation, Capacity and Knowled Prior Open 70,000.00 0.00 Canceled 2017-11-01 2017-12-20 2018-01-10 2018-02-14 2018-08-13 ant Selection y Support to Project Countrie ge s Page 1 DJ-IGAD-37530-CS-INDV / Re Regional Support for Coordin Individual Consult newal of contract for Senior P IDA / D1200 ation, Capacity and Knowled Prior Direct 504,000.00 0.00 Canceled 2017-11-22 2017-11-29 2017-12-02 2017-12-23 2018-01-27 2018-07-26 ant Selection rogramme Coordinator-IGAD/ ge DRDIP DJ-IGAD-37531-CS-INDV / Re Regional Support for Coordin Individual Consult newal of the contract for the IDA / D1200 ation, Capacity and Knowled Prior Direct 192,500.00 0.00 Canceled 2017-11-22 2018-02-28 2017-12-02 2017-12-23 2018-01-27 2018-07-26 ant Selection Project Accountant-IGAD/ DR ge DIP DJ-IGAD-84103-CS-INDV / Re Regional Support for Coordin Individual Consult cruitment of Senior Program IDA / D1200 ation, Capacity and Knowled Post Open 108,000.00 108,000.00 Completed 2018-11-05 2018-11-07 2018-11-26 2019-03-01 2018-11-30 2019-03-01 2019-01-04 2019-03-15 2020-01-03 2020-03-14 ant Selection me Coordinator ge DJ-IGAD-84105-CS-INDV / Re Regional Support for Coordin Individual Consult cruitment of Knowledge Man IDA / D1200 ation, Capacity and Knowled Post Open 72,000.00 84,000.00 Terminated 2018-11-05 2018-11-07 2018-11-26 2019-03-03 2018-11-30 2019-03-06 2019-01-04 2019-03-07 2020-01-03 ant Selection agement/ M&E Officer ge DJ-IGAD-119685-CS-INDV / C Regional Support for Coordin Individual Consult onsultancy for DRDIP1 Mid-T IDA / D1200 ation, Capacity and Knowled Post Open 20,000.00 5,444.92 Signed 2019-06-28 2019-07-09 2019-07-31 2019-09-02 2019-08-10 2019-08-27 2019-08-22 2019-09-03 2019-12-20 ant Selection erm Performance Evaluation ge DJ-IGAD-163245-CS-INDV / C Regional Support for Coordin onsultancy to Provide technic Individual Consult IDA / D1200 ation, Capacity and Knowled Post Open 40,000.00 20,000.00 Completed 2020-04-24 2020-06-16 2020-06-12 2020-11-22 2020-06-19 2020-11-22 2020-06-30 2020-11-24 2020-08-31 2021-08-24 al assistance to project count ant Selection ge ries on Renewable Energy DJ-IGAD-163875-CS-CDS / C Regional Support for Coordin onsultancy for Website Deve IDA / D1200 ation, Capacity and Knowled Post Direct Selection Direct 6,000.00 4,500.00 Signed 2020-04-10 2022-02-06 2020-04-20 2022-02-20 2020-06-01 2022-04-29 2020-08-03 lopment for DRDIP Ethiopia ge DJ-IGAD-163877-CS-INDV / R Regional Support for Coordin Individual Consult ecruitment of Knowledge Ma IDA / D1200 ation, Capacity and Knowled Post Open 72,000.00 84,000.00 Signed 2020-03-25 2020-04-01 2020-05-06 2020-11-23 2020-05-20 2020-11-25 2020-06-05 2020-12-02 2021-06-04 ant Selection nagement Expert ge DJ-IGAD-163863-CS-INDV / R ecruitment of Consultant for Regional Support for Coordin Individual Consult Documentation and Dissemin IDA / D1200 ation, Capacity and Knowled Post Open 90,000.00 98,800.00 Signed 2020-04-20 2020-09-16 2020-05-25 2021-01-26 2020-06-10 2021-03-04 2020-06-30 2021-03-08 2020-11-30 ant Selection ation of Innovative Developm ge ent Approaches in Education and CDD DJ-IGAD-182521-CS-CDS / C onsultancy for the Document Regional Support for Coordin ation of the Development Re IDA / D1200 ation, Capacity and Knowled Post Direct Selection Direct 9,000.00 9,000.00 Signed 2020-07-06 2020-07-09 2020-07-14 2020-07-07 2020-07-16 2020-07-11 2020-07-25 sponse to Displacement Imp ge acts Project (DRDIP) Impleme ntation response to COVID-1 9 Pandemic DJ-IGAD-203779-CS-INDV / R Regional Support for Coordin Individual Consult ecruitment of a replacement IDA / D1200 ation, Capacity and Knowled Post Open 54,000.00 38,143.00 Signed 2020-11-15 2020-11-15 2020-12-16 2021-05-21 2020-12-21 2021-05-21 2021-01-01 2021-06-02 2021-12-31 ant Selection for the Project Accountant ge DJ-IGAD-262737-CS-INDV / C Regional Support for Coordin onsultancy to provide Techni Individual Consult IDA / D1200 ation, Capacity and Knowled Post Open 50,000.00 0.00 Signed 2021-11-25 2022-04-07 2021-12-28 2022-08-06 2022-01-11 2022-08-24 2022-01-19 2022-07-18 cal Assistance to project cou ant Selection ge ntries on renewable energy. Phase II DJ-IGAD-38100-CS-INDV / Sel ection of Consultant to under Regional Support for Coordin take the Study to assess the Individual Consult IDA / D1200 ation, Capacity and Knowled Post Open 20,000.00 0.00 Canceled 2017-11-24 2017-12-06 2018-01-12 2018-02-26 2018-02-02 2018-03-09 2018-09-05 socio-economic impact on th ant Selection ge e migrant and refugee hostin g communities in Balbala, Dji bouti Ville, Djibouti DJ-IGAD-218325-CS-INDV / C Regional Support for Coordin onsultancy on the document Individual Consult IDA / D1200 ation, Capacity and Knowled Post Open 70,000.00 0.00 Canceled 2021-04-01 2021-05-20 2021-06-03 2021-07-08 2021-12-30 ation of Local Economic Deve ant Selection ge lopment ( LED) in DRDIP cou ntries DJ-IGAD-167215-CS-INDV / R Regional Support for Coordin Individual Consult enewal of Procurement Speci IDA / D1200 ation, Capacity and Knowled Post Direct 56,996.74 0.00 Canceled 2020-04-15 2020-05-18 2020-04-25 2020-06-03 2020-05-16 2020-06-20 2020-12-31 ant Selection alist Contract ge DJ-IGAD-185016-CS-INDV / C Regional Support for Coordin onsultancy for Editing and Pr Individual Consult IDA / D1200 ation, Capacity and Knowled Post Open 80,000.00 0.00 Canceled 2020-08-10 2020-09-14 2020-09-21 2020-10-12 2021-10-12 oofreading of Reports, Public ant Selection ge ations and Communication M aterials for IGAD DRDIP DJ-IGAD-163234-CS-INDV / C Regional Support for Coordin onsultancy to Provide technic Individual Consult IDA / D1200 ation, Capacity and Knowled Post Open 40,000.00 0.00 Canceled 2020-08-20 2020-10-08 2020-10-15 2020-10-27 2020-12-24 al assistance to project count ant Selection ge ries on the use of new techno logy for Livelihood DJ-IGAD-285799-CS-INDV / C Regional Support for Coordin Individual Consult Direct - Internation Under Implement onsultancy for Final Project E IDA / D1200 ation, Capacity and Knowled Post 50,000.00 0.00 2023-05-25 2023-05-23 2023-06-06 2023-06-13 2023-07-02 2023-12-29 ant Selection al ation valuation for DRDIP I&II ge Page 2 Procurement Plan I. General 1. Project Information Country : Kenya Recipient : Republic of Kenya Project Name : National Agriculture and Rural Inclusive Growth Loan Credit No. : IDA 59000 2. Date of General Procurement Notice : 9th February 2018 3. Period Covered by this procurement plan : 18 months II. Goods, Works, and Non-Consulting Services 1. Thresholds for the Method of Procurement: Method of Procurement Thresholds for Method (US$ equivalent) Open International (Goods) Equal to or more than 3 million Open National ( Goods) – Open < $3 million Tender as per PPDA 2015 RFQ (Goods) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Open International (Works) Equal to or more than 15 million Open National (Works) - Open Less than 15 million Tender as per PPDA 2015 RFQ (works) Less than 20,000 or as stipulated in Kenya Procurement Regulations 2017 Method of Procurement Thresholds for Method (US$ equivalent) Open International (Non-consulting Equal to or More than 3 million Services) Open National (Non-consulting Less than 3 million Services) - Open Tender as per PPDA 2015 Direct Contracting No threshold; meet requirements of Bank’s Procurement Regulations Prior Review: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection (Project Procurement Risk Rating is “High”): (a) Goods, information technology and Non-consulting Services: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 1.5 million (b) Works (including turnkey, supply & installation of plant and equipment and PPP); First procurement under the project irrespective of value and all procurements estimated to cost more than USD 5 million and The prior review thresholds will be reviewed during the implementation of the project and modified, based on the risk assessment. 2. For contracts subject to prior review, the Borrower shall seek the Bank’s no objection before agreeing to: a. an extension of the stipulated time for execution of a contract that has an impact on the planned completion of the project; b. any material modification of the scope of the Works, Goods, Non- consulting services or Consulting Services, or other significant changes to the terms and conditions of the contract; c. any variation order or contract amendment (except in cases of extreme urgency), including due to extension of time, that singly or combined with all previous variation orders or amendments, increases the original contract amount by more than 15% (fifteen percent); or d. the proposed termination of the contract. The Borrower / IA shall provide a copy of all amendments to the contract to the Bank for its records. 3. Prequalification Not Applicable Domestic Preference. The provision of domestic preference shall be applied in the procurement of goods following international market approach in accordance with Annex VI of the Regulations. Domestic preference shall not apply in the procurement of works. 4. Reference to Standard Procurement Documents Bank’s Standard RFB Goods and RFP Consulting Services dated July 2016 will be used as a base and incorporating suitable modifications and the same would be agreed with the Bank subject international competition. 5. Any Other Special Procurement Arrangements A. Procurement approach under CDD Approach by Communities: Applicable if stipulated in the PAD. B. When approaching the national market, as agreed in the Procurement Plan, the Open Tender procedure of Public Procurement and Asset Disposal Act 2015 and Regulations 2017 may be used. The specific Requirements for national open competitive procurement include the following: a. open advertising of the procurement opportunity at the national level; b. the procurement is open to eligible firms from any country; c. the request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; d. contracts with an appropriate allocation of responsibilities, risks, and liabilities; e. publication of contract award information; f. rights for the Bank to review procurement documentation and activities; g. an effective complaints mechanism; and h. maintenance of records of the Procurement Process. Other national procurement arrangements (other than national open competitive procurement), that may be applied by the Borrower (such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. In all cases, the national procurement procedures to be used shall give due attention to quality aspects. 6. The bid evaluation will be carried out according to the agreed timeline in the Procurement Activity Schedule. III. Selection of Consultants 1. Methods and Prior Review Threshold Selection methods of procurement of Consultants' Services (Firms): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Quality and Cost Based As per requirements of para 7.3 of the Selection (QCBS) Regulations Quality Based Selection As per requirements of para 7.8 to 7.10 (QBS) of the Regulations Selection based on a Fixed As per requirements of para 7.4 and 7.5 of the Budget (FBS) Regulations Selection Based on Least As per requirements of para 7.6 and 7.7 of the Cost Basis (LCS) Regulations Selection based on As per requirements of para 7.11 and 7.12 of Consultant’s Qualification the Regulations (CQ) Direct Must meet the requirements of Para 7.13 to 7.15 of the Regulations, and with prior agreement in PP with the Bank. The short list may consist of all National consultants in case the estimated cost is less than USD 300,000 Procurement methods for Selection of Individual Consultants (IC): The Approved Selection Methods as reflected in the Section VII of the procurement regulations Method of Procurement Thresholds for Methods Open Competitive As per requirements of para 7.36 and 7.37 of Selection the Regulations Limited Competitive As per requirements of para 7.38 of the Selection Regulations Direct Must meet the requirements of Para 7.39 of the Regulations, and with prior agreement in PP with the Bank *Shall meet the requirements as stated in Regulations Prior Review Thresholds: The details of the Procurement review / oversight are defined in the Annex II of the Regulations for borrowers. The following would be subject to Prior review of the Bank regardless of the Method of selection: (a). Consulting Firm: First procurement under the project irrespective of value and all procurements estimated to cost more than USD 0.5 million. (b). Individual Consultant: all procurements estimated to cost more than USD 0.2 million Terms of Reference (ToR) for all consultant contracts shall be furnished to the Bank for its prior review and No Objection. PROCUREMENT Kenya : National Agricultural and Rural Inclusive Growth Project PLAN General Information Country: Kenya 2019-10-03 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P153349 GPN Date: 2018-02-09 Project Name: National Agricultural and Rural Inclusive Growth Project Loan / Credit No: IDA / 59000 Trans Nzoia County Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned KE-TRANS NZOIA COUNTY-1 Project Coordination and Ma Request for Quota Single Stage - One E 2020-06-0 39287-CW-RFQ / Renovation IDA / 59000 Post Limited 8,000.00 7,253.49 Completed 2020-02-17 2020-04-24 2020-03-21 2020-05-19 nagement tions nvelope 4 of Trans Nzoia County Project Office KE-TRANS NZOIA COUNTY-1 70386-CW-RFB / Proposed co Supporting County Communi Single Stage - One E 2021-06-2 IDA / 59000 Post Request for Bids Open - National 800,000.00 719,291.58 Signed 2020-04-29 2020-05-11 2020-05-04 2020-06-04 2020-06-12 2020-06-11 2020-06-19 2020-06-28 2020-07-08 nstruction works for Chepkait ty-Led Development nvelope 8 it Irrigation Project in Cheran gany Sub-County KE-TRANS NZOIA COUNTY-1 84747-CW-RFB / Proposed Re Supporting County Communi Single Stage - One E 2021-09-3 IDA / 59000 Post Request for Bids Open - National 230,000.00 156,421.00 Terminated 2020-07-21 2020-08-27 2020-07-24 2020-08-27 2020-09-28 2020-09-10 2020-10-21 2020-09-30 2020-12-30 habilitation of Muroki Dam in ty-Led Development nvelope 0 Saboti Sub-County Request for Bids - KE-TRANS NZOIA COUNTY-2 Supporting County Communi Single Stage - One E Small Works SPD Under Imple 2022-12-3 93732-CW-RFB / Rehabilitatio IDA / 59000 Post Request for Bids Open - National 220,000.00 0.00 2022-05-09 2022-06-21 2022-05-11 2022-06-10 2022-07-10 2022-07-27 ty-Led Development nvelope (1 envelope proce mentation 0 n of Amani-Chepchoina Dam ss) KE-TRANS NZOIA COUNTY-3 Request for Quota Supporting County Communi Request for Quota Single Stage - One E Under Imple 2022-12-3 15089-CW-RFQ / Completion IDA / 59000 Post Limited tions (Non Bank-S 124,636.00 0.00 2022-09-26 2022-09-26 2022-10-31 ty-Led Development tions nvelope mentation 0 of Muroki Earth Dam, Saboti PD) Sub-County KE-TRANS NZOIA COUNTY-3 Strengthening Producer Org Request for Quota 22959-CW-RFQ / Constructio Request for Quota Single Stage - One E Pending Imp 2023-01-2 IDA / 59000 anizations and Value Chain Post Limited tions (Non Bank-S 58,100.00 0.00 2022-10-26 2022-11-27 n of a Banana Collection Cen tions nvelope lementation 6 Development PD) tre at Sirende,Trans Nzoia Co unty. KE-TRANS NZOIA COUNTY-3 23243-CW-RFQ / Constructio Strengthening Producer Org Request for Quota n of a Chicken Slaughter Faci Request for Quota Single Stage - One E Pending Imp 2023-08-1 IDA / 59000 anizations and Value Chain Post Limited tions (Non Bank-S 122,651.40 0.00 2023-04-24 2023-05-21 lity for Trans Queens and Kin tions nvelope lementation 9 Development PD) gs PO, in Matisi Ward,Saboti Sub County, Trans Nzoia Cou nty GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-TRANS NZOIA COUNTY-1 38533-GO-RFQ / ICT Equipme nt : Laptop HP ENVY x360 1b p165cl 16 GB RAM core i7- 1 Project Coordination and Ma Request for Quota Single Stage - One E TB+256 SSD Touchscreen Wi IDA / 59000 Post Open - National 12,000.00 0.00 Canceled 2019-10-09 2019-12-04 2020-06-01 nagement tions nvelope ndows 10 Black-6 No; Samsu ng S8 5.8'' 4GB RAM 12MP- D ual SIM Black-10 No; External Hard disk Drive 1TB Transce nd or equivalent-10 No KE-TRANS NZOIA COUNTY-1 38674-GO-RFQ / Motorcycle Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Open - National 107,000.00 0.00 Canceled 2019-10-09 2019-12-04 2020-06-01 175cc; Wheelbase- 13 50mm nagement tions nvelope /53.1in; Weight-99kg KE-TRANS NZOIA COUNTY-1 39140-GO-RFQ / Land survey Supporting County Communi Request for Quota Single Stage - One E & soil testing equipment; Clin IDA / 59000 Post Limited 44,040.00 27,817.00 Completed 2019-11-12 2020-08-27 2019-12-21 2020-10-22 2020-02-19 2021-03-11 ty-Led Development tions nvelope ometer,GPS, RTK,LCD,Mobile mapper,levelling boards,Tap e Measure,Spirit level KE-TRANS NZOIA COUNTY-1 39300-GO-RFQ / ICT Equipme nt : Laptop x360 1bp165cl 1 Project Coordination and Ma Request for Quota Single Stage - One E 6 GB RAM core i7- 1TB+256 IDA / 59000 Post Limited 12,000.00 14,279.18 Completed 2020-02-18 2020-05-19 2020-03-24 2020-08-06 2020-05-05 2020-08-15 nagement tions nvelope SSD Touchscreen Windows 1 0 Black; Smart phone 5.8'' 4 GB RAM 12MP- Dual SIM Blac k; External Hard disk Drive 1 TB KE-TRANS NZOIA COUNTY-1 38674-GO-RFQ-2 / Purchase of brand new motor cycle; en Project Coordination and Ma Request for Quota Single Stage - One E gine capacity 100-130 cc; 4 s IDA / 59000 Post Limited 80,000.00 54,888.43 Completed 2020-04-21 2020-05-11 2020-06-02 2020-07-25 2020-09-01 2020-12-08 nagement tions nvelope troke, single cylinder; comple te with riding gear; 1 year wa rranty; spare parts locally av ailable KE-TRANS NZOIA COUNTY-1 Strengthening Producer Org Request for Quota Single Stage - One E 77183-GO-RFQ / Supply and i IDA / 59000 anizations and Value Chain Post Limited 70,000.00 62,221.22 Completed 2020-06-09 2020-09-11 2020-07-21 2020-11-05 2020-10-19 2021-08-02 tions nvelope nstallation of Tomato greenh Development ouse system KE-TRANS NZOIA COUNTY-1 68368-NC-RFQ / Supply and i Project Coordination and Ma Request for Quota Single Stage - One E IDA / 59000 Post Limited 81,000.00 65,093.98 Completed 2020-06-15 2020-09-11 2020-07-17 2020-11-06 2020-08-17 2021-02-16 nstallation of teleconferencin nagement tions nvelope g system and internet conne ctivity KE-TRANS NZOIA COUNTY-1 92028-GO-DIR / Supply and I Supporting Community-Driv IDA / 59000 Post Direct Selection Direct 46,000.00 7,617.80 Completed 2020-09-05 2020-09-22 2020-09-10 2020-10-07 2020-09-15 2020-11-17 2020-12-14 2021-04-07 nstallation of Solar Powered I en Development rrigation Pumps-50 NO. Page 1 KE-TRANS NZOIA COUNTY-2 24433-GO-RFQ / Supply and Supporting County Communi Request for Quota Single Stage - One E IDA / 59000 Post Limited 4,740.00 2,160.22 Completed 2021-03-16 2021-03-26 2021-04-12 2021-04-27 2021-05-31 2021-06-10 Delivery of Hardened Greville ty-Led Development tions nvelope a Seedlings to Amani Area in Chepchoina Ward KE-TRANS NZOIA COUNTY-2 24434-GO-RFQ / Supply and Supporting County Communi Request for Quota Single Stage - One E IDA / 59000 Post Limited 11,850.00 10,674.70 Completed 2021-03-16 2021-03-26 2021-04-12 2021-04-27 2021-05-31 2021-04-30 Delivery of Avocado Hass Se ty-Led Development tions nvelope edlings to Amani Area in Che pchoina Ward KE-TRANS NZOIA COUNTY-2 59351-GO-RFQ / Purchase an Supporting County Communi Request for Quota Single Stage - One E d delivery of mature hardene IDA / 59000 Post Limited 12,000.00 6,917.03 Completed 2021-11-01 2021-11-12 2021-12-13 2021-12-17 2022-01-13 ty-Led Development tions nvelope d bamboo seedlings to Aman i- Chepchoina catchment KE-TRANS NZOIA COUNTY-2 Project Coordination and Ma Request for Quota Single Stage - One E 60327-GO-RFQ / SUPPLY AND IDA / 59000 Post Limited 44,600.00 37,650.64 Completed 2021-11-01 2021-11-12 2021-12-13 2021-12-17 2022-03-13 nagement tions nvelope INSTALLATION OF SIGN POST S KE-TRANS NZOIA COUNTY-2 59340-GO-RFQ / PURCHASE OF PRINTED SHIRTS -50 No Project Coordination and Ma Request for Quota Single Stage - One E PURCHASE OF PRINTED T-SHI IDA / 59000 Post Limited 6,250.00 5,105.98 Signed 2021-11-25 2022-02-10 2022-01-06 2022-03-19 2022-02-06 nagement tions nvelope RTS -350 No PURCHASE OF PRINTED CAPS - 150 No KE-TRANS NZOIA COUNTY-2 Project Coordination and Ma Request for Quota Single Stage - One E 63541-GO-RFQ / Supply and IDA / 59000 Post Limited 20,000.00 8,512.05 Completed 2021-11-27 2022-02-10 2022-01-10 2022-03-09 2022-04-11 2022-03-15 nagement tions nvelope Delivery of Teleconference F urniture KE-TRANS NZOIA COUNTY-2 Supporting County Communi Request for Quota Single Stage - One E Pending Impl 70756-GO-RFQ / supply, deliv IDA / 59000 Post Limited 6,400.00 0.00 2021-12-29 2022-02-23 2022-03-25 ty-Led Development tions nvelope ementation ery and testing of soil scanne r. KE-TRANS NZOIA COUNTY-2 Supporting County Communi 63832-GO-DIR / Supply and IDA / 59000 Post Direct Selection Direct 10,760.00 0.00 Completed 2021-12-24 2022-02-17 2021-12-29 2022-04-12 2022-01-11 2022-04-11 ty-Led Development Delivery of Kuza Biashara IC T Equipment KE-TRANS NZOIA COUNTY-2 Supporting County Communi Request for Quota Single Stage - One E Pending Impl 70765-GO-RFQ / Supply and IDA / 59000 Post Limited 500.00 0.00 2022-02-06 2022-04-03 2022-05-03 ty-Led Development tions nvelope ementation delivery of bluetooth speaker KE-TRANS NZOIA COUNTY-2 91922-GO-RFQ / Supply and Supporting County Communi Request for Quota Single Stage - One E Under Imple IDA / 59000 Post Limited 5,970.00 0.00 2022-05-01 2022-05-05 2022-06-05 2022-07-05 delivery of well hardened, gr ty-Led Development tions nvelope mentation afted Avocado seedlings to K aptega KE-TRANS NZOIA COUNTY-2 92041-GO-RFQ / Supply and Supporting County Communi Request for Quota Single Stage - One E IDA / 59000 Post Limited 2,388.00 0.00 Completed 2022-05-01 2022-05-05 2022-06-06 2022-07-06 2022-08-15 Delivery of Grevillea Seedling ty-Led Development tions nvelope s to Kaptega Area KE-TRANS NZOIA COUNTY-2 93871-GO-RFB / Supply and I Supporting County Communi Single Stage - One E Under Imple nstallation of Milk Processing IDA / 59000 Post Request for Bids Open - National 301,854.00 0.00 2022-05-10 2022-07-27 2022-05-11 2022-06-10 2022-08-26 2022-06-14 2022-06-29 2022-09-27 ty-Led Development nvelope mentation Plant (Pasteurisation) at Cher angany Dairy Group in Chera ngany Sub-County KE-TRANS NZOIA COUNTY-2 Project Coordination and Ma Request for Quota Single Stage - One E 93901-GO-RFQ / Supply and IDA / 59000 Post Limited 2,000.00 0.00 Completed 2022-05-11 2022-03-18 2022-06-13 2022-08-12 nagement tions nvelope Delivery of LCD Projector- 2 No KE-TRANS NZOIA COUNTY-3 01018-GO-RFB / Supply and I nstallation of an extended Sh Supporting County Communi Single Stage - One E Under Imple IDA / 59000 Post Request for Bids Open - National 555,000.00 0.00 2022-06-24 2022-11-15 2022-06-28 2022-07-28 2022-08-04 2022-08-19 2022-11-17 elf life Milk processing Machi ty-Led Development nvelope mentation ne at Dairy Farmers of Chera ngany, in Cherengany sub-c ounty. KE-TRANS NZOIA COUNTY-3 17631-GO-RFQ / supply and Strengthening Producer Org Request for Quota Single Stage - One E Under Imple delivery of brand new tracto IDA / 59000 anizations and Value Chain Post Limited 53,222.00 0.00 2022-09-28 2022-11-07 2022-10-31 2022-12-30 tions nvelope mentation r- 2 No. for Kapsitwet and mu Development bere producer organisations KE-TRANS NZOIA COUNTY-3 17707-GO-RFQ / supply and Strengthening Producer Org Request for Quota Single Stage - One E Under Imple delivery of 7 tonne Agricultur IDA / 59000 anizations and Value Chain Post Limited 13,360.00 0.00 2022-09-28 2022-10-21 2022-10-31 2022-12-30 tions nvelope mentation al Trailer -2 No.for Kapsitwet Development and Mubere producer organis ations KE-TRANS NZOIA COUNTY-3 17726-GO-RFQ / Supply and Strengthening Producer Org Request for Quota Single Stage - One E Under Imple delivery of stainless milking c IDA / 59000 anizations and Value Chain Post Limited 11,950.00 0.00 2022-09-28 2022-12-14 2022-10-31 2022-12-30 tions nvelope mentation an-96 No. for Kapsitwet and Development Mubere producer organizatio ns KE-TRANS NZOIA COUNTY-3 Strengthening Producer Org Request for Quota Single Stage - One E Under Imple 17744-GO-RFQ / supply and IDA / 59000 anizations and Value Chain Post Limited 44,813.00 0.00 2022-09-28 2022-11-29 2022-10-31 2022-12-30 tions nvelope mentation delivery of milk truck Development KE-TRANS NZOIA COUNTY-3 17817-GO-RFQ / Supply and Supporting County Communi Request for Quota Single Stage - One E Delivery of Grevillea Seedling IDA / 59000 Post Limited 17,333.00 0.00 Completed 2022-09-28 2022-10-24 2022-10-31 2022-12-30 ty-Led Development tions nvelope s to Kapolet, Gitwamba, Che psiro, Teldet and Kimondo W atersheds KE-TRANS NZOIA COUNTY-3 17822-GO-RFQ / Supply and Supporting County Communi Request for Quota Single Stage - One E Delivery of Avocado (Hass) S IDA / 59000 Post Limited 24,882.00 0.00 Completed 2022-09-28 2022-10-24 2022-10-31 2022-12-30 ty-Led Development tions nvelope eedlings to Kapolet, Gitwamb a, Chepsiro, Teldet and Kimo ndo Watersheds KE-TRANS NZOIA COUNTY-3 23247-GO-RFQ / Supply and Strengthening Producer Org Request for Quota Single Stage - One E Under Imple Delivery of 3500L Milk Cooler IDA / 59000 anizations and Value Chain Post Limited 41,500.00 0.00 2022-10-28 2022-11-08 2022-11-30 2023-01-29 tions nvelope mentation and Accessories to Chepkoile Development l Producer Organisation Page 2 KE-TRANS NZOIA COUNTY-3 27051-GO-RFQ / supply and delivery of; digital weighing s Strengthening Producer Org Request for Quota Single Stage - One E Pending Impl cale-7 No. ,paper egg trays(3 IDA / 59000 anizations and Value Chain Post Limited 7,833.00 0.00 2022-12-02 2023-01-04 2023-03-06 tions nvelope ementation 500 No.), aluminum milk can Development s 50 litres-20No. and plastic crates for tomatoes and bana nas-315 No. KE-TRANS NZOIA COUNTY-3 Supporting County Communi Request for Quota Single Stage - One E Under Imple 39714-GO-RFQ / Supply and I IDA / 59000 Post Limited 67,477.00 0.00 2023-02-06 2023-03-16 2023-04-15 ty-Led Development tions nvelope mentation nstallation of Dam Liner-127 No KE-TRANS NZOIA COUNTY-3 Supporting County Communi Request for Quota Single Stage - One E Under Imple 39722-GO-RFQ / Supply and I IDA / 59000 Post Limited 24,166.00 0.00 2023-02-06 2023-03-16 2023-04-15 ty-Led Development tions nvelope mentation nstallation of Shade Net-127 No KE-TRANS NZOIA COUNTY-3 39903-GO-RFQ / Supply and Supporting County Communi Request for Quota Single Stage - One E Under Imple Delivery of 2000 litre Plastic IDA / 59000 Post Limited 12,051.00 0.00 2023-02-06 2023-03-15 2023-04-14 ty-Led Development tions nvelope mentation Rectangular Water Tank fitte d with 1 inch metallic Tap-75 No KE-TRANS NZOIA COUNTY-3 40036-GO-DIR / Supply and I Supporting County Communi Pending Impl IDA / 59000 Post Direct Selection Direct - National 66,252.00 0.00 2023-02-03 2023-02-06 2023-02-10 2023-04-11 nstallation of Sunculture Sola ty-Led Development ementation r Water Pumping System - 12 7 No KE-TRANS NZOIA COUNTY-3 Strengthening Producer Org 57907-GO-RFQ / Supply,deliv Request for Quota Single Stage - One E Pending Impl IDA / 59000 anizations and Value Chain Post Limited 25,308.00 0.00 2023-05-05 2023-06-07 2023-08-06 ery and installation of equip tions nvelope ementation Development ment to chicken slaughter fa cility NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-TRANS NZOIA COUNTY-2 Strengthening Producer Org 91694-NC-DIR / AMTECH ACS IDA / 59000 anizations and Value Chain Post Direct Selection Direct 7,500.00 0.00 Completed 2022-04-28 2022-02-17 2022-05-03 2022-05-05 2022-05-12 2022-11-08 SYSTEM LICENCING Development KE-TRANS NZOIA COUNTY-2 Strengthening Producer Org 91710-NC-DIR / M-SHAMBA LI Under Imple IDA / 59000 anizations and Value Chain Post Direct Selection Direct 6,360.00 0.00 2022-04-28 2022-02-17 2022-05-03 2022-06-17 2022-05-12 2022-11-08 CENSE FOR MARKET TECHNO mentation Development LOGY PLATFORM CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-TRANS NZOIA COUNTY-1 71035-CS-CQS / Recruitment Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 35,000.00 28,921.82 Signed 2020-05-08 2020-09-09 2020-05-29 2020-06-14 2020-10-19 2020-07-14 2020-12-15 2020-08-02 2020-12-16 2021-12-31 of service provider for local c en Development cation Selection hicken value chain extension advisory services KE-TRANS NZOIA COUNTY-1 72413-CS-CQS / Recruitment Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 35,000.00 19,632.33 Signed 2020-05-08 2020-09-09 2020-05-29 2020-06-14 2020-10-19 2020-07-14 2021-01-13 2020-08-02 2021-01-14 2021-12-31 of service provider for tomat en Development cation Selection o value chain extension servi ces KE-TRANS NZOIA COUNTY-1 71215-CS-CQS / Recruitment Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 35,000.00 15,421.91 Signed 2020-05-08 2020-09-09 2020-05-29 2020-06-14 2020-10-19 2020-07-14 2020-12-15 2020-08-02 2020-12-16 2021-12-31 of service provider for banan en Development cation Selection a value chain extension advis ory services KE-TRANS NZOIA COUNTY-1 71210-CS-CQS / Recruitment Supporting Community-Driv Consultant Qualifi IDA / 59000 Post Open - National 35,000.00 23,147.23 Signed 2020-05-08 2020-09-09 2020-05-29 2020-06-14 2020-06-27 2020-07-14 2020-12-15 2020-08-02 2020-12-16 2021-12-31 of service provider for dairy c en Development cation Selection ow milk value chain advisory services KE-TRANS NZOIA COUNTY-1 Strengthening Producer Org 77165-CS-CQS / Provision of Consultant Qualifi Pending Impleme IDA / 59000 anizations and Value Chain Post Open - National 50,000.00 0.00 2020-06-05 2020-06-19 2020-06-30 2020-07-14 2020-08-04 2021-12-31 management and extension cation Selection ntation Development advisory services for forage multiplication INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual KE-TRANS NZOIA COUNTY-1 44784-CS-QCBS / Recruitmen Supporting Community-Driv Individual Consult IDA / 59000 Post Limited 140,000.00 0.00 Canceled 2019-11-13 2019-11-18 2019-12-02 2019-12-20 2020-12-17 t of service providers for ext en Development ant Selection ension advisory services KE-TRANS NZOIA COUNTY-2 75583-CS-INDV / provisional Supporting Community-Driv Individual Consult Pending Impleme IDA / 59000 Post Limited 25,000.00 0.00 2022-02-01 2022-02-08 2022-02-14 2022-02-23 2023-02-23 of financial management ser en Development ant Selection ntation vices to farmers groups Page 3 PLAN DE PASSATION DE MARCHES I. Information générales sur le Projet : Pays :République du Mali Nom du Projet : PROJET « ACCELERER LE PROGRES VERS LA COUVERTURE SANITAIRE UNIVERSLLE (APCSU) » Numéro d’identification du projet : P165534 Agence d’exécution du Projet : Unité de Gestion des Projets Santé (ex Unité de coordination du projet régional de lutte contre le Paludisme saisonnier et les Maladies Tropicales Négligées au Sahel Date du plan de passation des marchés : 14 février 2019 Période couverte par ce plan de passation des marchés : Octobre 2019 à Mars 2021 II. Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016, révisé en Novembre 2017 et Août 2018) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées dans le Décret N° 2015-604/P-RM du 25 Septembre 2015 portant Code des marchés publics et des délégations de service public et le Décret N° 2016-0920 du 6 Décembre 2016 portant modifications dudit code, ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : - Publicité ouverte de l'opportunité de marché au niveau national, quel que soit le coût estimé du marché. - Le dossier d'appel d'offres/ la demande de propositions devra exiger que les soumissionnaires présentant une offre/ proposition soumette une acceptation signée au moment de l'appel d'offres et devant être incorporée dans tout contrat subséquent, confirmant ainsi l'application et le respect des Directives Anti-Corruption de la Banque, y compris, sans s'y limiter, le droit de la Banque de sanctionner et les droits d'inspection et d'audit de la Banque. - Les contrats doivent inclure une répartition appropriée des responsabilités, des risques et des passifs jugés acceptables par la Banque (notamment pour renforcer la performance environnementale et sociale, la santé et la sécurité, la lutte contre l’exploitation sexuelle et les violences basées sur le genre). - La publication des informations sur l'attribution du contrat, quel que soit le coût estimé du marché. - Les droits pour la Banque d'examiner la documentation et les activités de passation des marchés. - La conservation des dossiers de passation des marchés (l'exigence doit être incluse dans les documents d'appel d'offres. Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas pour les contrats indiqués dans les tableaux du Plan de passation des marchés Travaux : « Sans objet » Autres informations pertinentes sur la passation des marchés. « Sans objet » PROCUREMENT Mali : Mali - Accelerating Progress Towards Universal Health Coverage PLAN General Information Country: Mali 2020-01-23 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165534 GPN Date: Project Name: Mali - Accelerating Progress Towards Universal Health Coverage Loan / Credit No: IDA / D4420 Acceleration Progress Towards Universal Health Coverage PIU Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned National Procure ML-M-APUHC-233701-CW-RF ment Document - Strengthening Community H Request for Quota Single Stage - One E Pending Imp 2021-09-1 Q / Aménagement du site d'i IDA / D4420 Post Limited 1 Envelope proce 41,500.00 0.00 2021-06-03 2021-08-14 ealth Activities tions nvelope lementation 3 mplantation de l'Incinérateur ss (Non Bank-SPD à DIO ) ML-M-APUHC-278084-CW-RF National Procure Q / Aménagement du site d'i Strengthening Stewardship f ment Document - Request for Quota Single Stage - One E Pending Imp 2022-08-0 mplantation de l'incinérateur IDA / D4420 or Improved Health System Post Open - National 1 Envelope proce 81,665.00 0.00 2022-03-17 2022-06-10 tions nvelope lementation 9 de la Direction de la Pharmac Performance ss (Non Bank-SPD ie et du Médicament (DPM) ) National Procure ML-M-APUHC-334688-CW-RF Strengthening Stewardship f ment Document - B / Aménagement du site de Single Stage - One E Pending Imp 2023-08-2 IDA / D4420 or Improved Health System Post Request for Bids Open - National 1 Envelope proce 267,000.00 0.00 2023-01-25 2023-02-04 2023-03-21 2023-04-11 2023-05-23 vant abriter l'incinérateur de nvelope lementation 1 Performance ss (Non Bank-SPD destruction des médicament ) s périmés. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-M-APUHC-157055-GO-RF Strengthening Stewardship f Q / Mobiliers et équipements Request for Quota Single Stage - One E IDA / D4420 or Improved Health System Post Open - National 95,000.00 89,270.82 Signed 2020-02-25 2020-05-01 2020-07-28 2020-06-15 de bureau pour l'unité de ges tions nvelope Performance tion du Projet et CTN ML-M-APUHC-157083-GO-RF Strengthening Health Servic Q / Equipements Médicaux p Request for Quota Single Stage - One E IDA / D4420 e Delivery through Performa Post Limited 42,000.00 44,325.84 Signed 2020-02-27 2020-03-11 2020-04-25 2020-04-03 2020-05-25 our les Etudes d'Evaluation d' tions nvelope nce Based Financing Impact et de SDI ML-M-APUHC-157084-GO-RF Q / Acquisitions de 100 Table Strengthening Health Servic Request for Quota Single Stage - One E ttes+ Power Bank+ Puces po IDA / D4420 e Delivery through Performa Post Limited 41,500.00 45,281.82 Signed 2020-02-27 2020-03-11 2020-04-25 2020-04-03 2020-05-25 tions nvelope ur les enquêteurs des Etudes nce Based Financing Evaluation d’impact et SDI ML-M-APUHC-157080-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Q / Acquisition Matériels Audi IDA / D4420 or Improved Health System Post Open - National 60,000.00 64,109.79 Signed 2020-03-03 2020-05-08 2020-06-23 2020-08-06 tions nvelope ovisuels pour l'UCP et CTN Performance ML-M-APUHC-157047-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E B / Equipements informatiqu IDA / D4420 or Improved Health System Post Open - National 95,000.00 74,355.21 Signed 2020-03-11 2020-05-16 2021-07-28 2020-06-30 tions nvelope es pour l'unité de gestion du Performance Projet et la CTN ML-M-APUHC-166444-NC-DI R / Solution de Visioconféren Strengthening Stewardship f ce de la salle de Conférence IDA / D4420 or Improved Health System Post Direct Selection Direct 40,000.00 45,202.33 Signed 2020-04-01 2020-03-30 2020-04-06 2020-04-02 2020-04-27 2020-04-11 2020-05-12 des Partenaires de la Banque Performance Mondiale niveau du Cabinet du Ministère de la Santé et d e l'UCP du PACSU ML-M-APUHC-174691-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Q / Acquisition de Logiciel TO IDA / D4420 or Improved Health System Post Limited 40,000.00 42,944.53 Signed 2020-06-07 2020-07-16 2020-08-02 2020-08-13 2020-10-01 tions nvelope MPRO pour le PACSU Performance ML-M-APUHC-157086-GO-RF Strengthening Stewardship f B / Acquisition de 03 véhicule Single Stage - One E IDA / D4420 or Improved Health System Post Request for Bids Open - National 1,407,000.00 0.00 Canceled 2020-02-27 2020-03-13 2020-04-12 2020-04-27 2020-06-24 2020-09-22 s tout terrain station wagon e nvelope Performance t de 31 véhicules double Cabi ne tout terrain ML-M-APUHC-185717-GO-RF Strengthening Stewardship f Single Stage - One E B / Acquisition de véhicules t IDA / D4420 or Improved Health System Post Request for Bids Open - National 295,000.00 320,952.03 Signed 2020-08-24 2020-10-19 2020-09-03 2020-10-03 2020-11-17 2020-10-24 2020-11-17 2020-12-14 2021-02-02 2021-02-12 nvelope out terrain Performance ML-M-APUHC-185718-GO-RF Strengthening Stewardship f Single Stage - One E B / Acquisition de Tablettes e IDA / D4420 or Improved Health System Post Request for Bids Open - National 160,000.00 161,370.82 Signed 2020-08-27 2020-10-05 2020-09-06 2020-10-06 2020-11-18 2020-10-27 2020-11-18 2020-12-17 2021-02-13 2021-01-31 nvelope t Accessoires pour les ASC Performance ML-M-APUHC-185719-GO-RF Strengthening Community H Request for Quota Single Stage - One E Pending Impl Q / Acquisiton d'Equipements IDA / D4420 Post Open - National 99,585.00 0.00 2020-09-16 2020-12-01 2021-01-15 ealth Activities tions nvelope ementation médicaux pour les ASC ML-M-APUHC-185720-GO-RF Strengthening Community H Single Stage - One E Pending Impl IDA / D4420 Post Request for Bids Open - National 612,600.00 0.00 2020-09-04 2020-09-14 2020-10-14 2020-11-04 2020-12-25 2021-03-25 B / Achat d'Iintrants pour les ealth Activities nvelope ementation ASC ML-M-APUHC-185721-GO-RF B / Acheter de la farine nutrit ionnelle pour la prise en cha Strengthening Community H Single Stage - One E Pending Impl rge des cas de malnutrition a IDA / D4420 Post Request for Bids Limited 918,000.00 0.00 2020-09-07 2020-09-17 2020-10-17 2020-11-07 2020-12-28 2021-03-28 ealth Activities nvelope ementation iguë modérée de 30 enfants MAM de ménages vulnérable s durant 2 mois dans 281 air es de santé ML-M-APUHC-185749-GO-RF Strengthening Community H Request for Quota Single Stage - One E Q / Acquisition de produits co IDA / D4420 Post Open - National 92,000.00 84,855.34 Signed 2020-09-22 2020-12-23 2021-02-20 2021-02-06 ealth Activities tions nvelope ntraceptifs pour les ASC ML-M-APUHC-185751-GO-RF Q / Acquisition d' équipement Strengthening Community H Request for Quota Single Stage - One E IDA / D4420 Post Limited 34,000.00 84,006.33 Signed 2020-10-03 2020-04-03 2020-11-28 2020-06-23 2020-12-28 s informatiques pour le renfo ealth Activities tions nvelope rcement du SLIS Page 1 ML-M-APUHC-185752-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Q / Acquisition solutions visio IDA / D4420 or Improved Health System Post Limited 25,000.00 26,718.53 Signed 2020-08-30 2020-08-27 2020-10-25 2020-12-18 2020-11-09 tions nvelope conference pour la CTN Performance ML-M-APUHC-187472-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Q / Acquisition consommable IDA / D4420 or Improved Health System Post Limited 79,165.00 82,616.43 Signed 2020-09-01 2020-08-26 2020-10-27 2020-12-29 2020-11-26 tions nvelope s Covid pour Etude SDI Performance ML-M-APUHC-228110-GO-RF Q / Doter le site de destructio Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl n des médicaments périmés IDA / D4420 or Improved Health System Post Limited 41,415.00 0.00 2021-05-20 2021-07-17 2021-09-15 tions nvelope ementation de la DPM à Dio (cercle de K Performance ati, région de Koulikoro) d'un incinérateur. ML-M-APUHC-228117-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl Q / Equiper les cabinets/cliniq IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2021-05-28 2021-07-25 2021-09-08 tions nvelope ementation ues privés en kit solaire Performance ML-M-APUHC-228119-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl Q / Acquisition consommable IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2021-06-02 2021-07-30 2021-08-29 tions nvelope ementation s Covid pour le CGP et l'UGP Performance ML-M-APUHC-228122-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Q / Acquisition de Serveurs p IDA / D4420 or Improved Health System Post Open - National 60,000.00 0.00 Canceled 2021-05-26 2021-09-05 2021-11-04 tions nvelope our l'ANTIM et l'ANAM Performance ML-M-APUHC-228240-GO-RF Strengthening Stewardship f Q / Acquisition d' équipement Request for Quota Single Stage - One E Under Imple IDA / D4420 or Improved Health System Post Open - National 77,660.00 0.00 2021-07-02 2021-10-07 2021-12-06 s informatiques pour les stru tions nvelope mentation Performance ctures bénéficiaires ML-M-APUHC-228109-GO-RF Strengthening Community H Request for Quota Single Stage - One E Q / Acquisition des tablettes IDA / D4420 Post Open - National 94,166.00 90,283.08 Signed 2021-07-07 2021-09-29 2021-10-29 2021-11-28 ealth Activities tions nvelope et téléphones portables Andr oid ML-M-APUHC-233706-GO-RF Strengthening Stewardship f Q / Acquérir des registres, st Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 26,666.00 0.00 2021-06-30 2021-09-10 2021-10-10 ylos, boites à suggestion pou tions nvelope ementation Performance r l'enregistrement des plaint es au profit des CGP ML-M-APUHC-233712-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl Q / Acquisition d'un groupe él IDA / D4420 or Improved Health System Post Limited 40,830.00 0.00 2021-06-22 2021-09-02 2021-10-02 tions nvelope ementation ectrogène pour l'UGP/CTN Performance ML-M-APUHC-250521-GO-RF Q / Acquisition de serveurs et Strengthening Community H Request for Quota Single Stage - One E Pending Impl IDA / D4420 Post Open - National 99,900.00 0.00 2021-10-20 2021-12-23 2022-02-06 solution de visio-conférence ealth Activities tions nvelope ementation pour l'ANTIM et l'ANAM ML-M-APUHC-275688-GO-RF Strengthening Community H Single Stage - One E Pending Impl B / Acquisition d'Ordinateurs IDA / D4420 Post Request for Bids Open - National 147,500.00 0.00 2022-02-24 2022-03-06 2022-04-05 2022-04-26 2022-06-07 2022-08-06 ealth Activities nvelope ementation portables et accessoires ML-M-APUHC-275692-GO-RF Q / Acquisition de matériels d e mesure (Sondes températu Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl re, émissiomètres) pour les S IDA / D4420 or Improved Health System Post Limited 41,330.00 0.00 2022-03-16 2022-04-27 2022-05-27 tions nvelope ementation ervices d'Assainissement et Performance de Contrôle des Pollutions et des Nuisances (SACPN) de la zone d'intervention du projet ML-M-APUHC-275693-GO-RF Strengthening Stewardship f Q / Acquisition d'équipement Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2022-03-14 2022-04-25 2022-05-25 de Visio conférence pour le C tions nvelope ementation Performance abinet du MSDS ML-M-APUHC-275704-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Under Imple Q / Acquisition de Tablettes e IDA / D4420 or Improved Health System Post Limited 18,330.00 0.00 2022-04-05 2022-05-31 2022-06-30 tions nvelope mentation t accessoires Performance ML-M-APUHC-275705-GO-RF Strengthening Community H Request for Quota Single Stage - One E Pending Impl IDA / D4420 Post Limited 41,665.00 0.00 2022-04-17 2022-06-12 2022-07-12 Q / Acquisition de Chargeurs ealth Activities tions nvelope ementation solaires ML-M-APUHC-278081-GO-RF B / Acquisition de Téléphones Strengthening Community H Single Stage - One E Pending Impl IDA / D4420 Post Request for Bids Open - National 331,665.00 0.00 2022-02-22 2022-03-09 2022-04-08 2022-04-23 2022-06-04 2022-08-03 Android et accessoires pour l ealth Activities nvelope ementation a Digitalisation et la Gestion des Plaintes ML-M-APUHC-278106-GO-RF Strengthening Stewardship f Q / Acquisition de registres, s Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2022-04-13 2022-06-08 2022-07-08 tylos, boites à suggestion po tions nvelope ementation Performance ur l'enregistrement des Plaint es au profit des CGP ML-M-APUHC-334697-GO-RF Strengthening Stewardship f Q / Acquisition d'équipement Request for Quota Single Stage - One E IDA / D4420 or Improved Health System Post Limited 41,000.00 0.00 Canceled 2023-03-07 2023-04-16 2023-05-31 s informatiques pour le PNBV tions nvelope Performance G, l'ANAES, l'ONASER. ML-M-APUHC-334700-GO-RF Strengthening Stewardship f Q / Acquisition d'un groupe él Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 42,000.00 0.00 2023-03-11 2023-04-20 2023-06-04 ectrogène pour les serveurs tions nvelope ementation Performance du portail de l'ANTIM ML-M-APUHC-334708-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl Q / Acquisition d'un module S IDA / D4420 or Improved Health System Post Limited 42,000.00 0.00 2023-02-09 2023-03-26 2023-04-25 tions nvelope ementation MS pour la déclaration des d Performance onnées FOSA ML-M-APUHC-334682-GO-DI R / Achat et mise en place de la farine nutritionnelle pour l Strengthening Community H Single Stage - One E a prise en charge des cas de IDA / D4420 Post Request for Bids Open - National 640,000.00 0.00 Canceled 2023-02-09 2023-02-24 2023-03-31 2023-04-30 2023-06-20 2023-10-18 ealth Activities nvelope malnutrition aigue modérée de 30 enfants MAM de ména ges vulnérable durant 2 mois dans 281 aires de santé ML-M-APUHC-334698-GO-RF Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl Q / Acquisition de mobiliers d IDA / D4420 or Improved Health System Post Limited 22,000.00 0.00 2023-03-06 2023-04-15 2023-05-30 tions nvelope ementation e bureau pour l'ONASER. Performance Page 2 ML-M-APUHC-337045-GO-RF Q / Acquisition d'équipement s informatiques pour le PNBV Strengthening Community H Request for Quota Single Stage - One E Pending Impl IDA / D4420 Post Open - National 81,000.00 0.00 2023-03-02 2023-05-24 2023-07-08 G, l'ANAES et l'ONASR et d'u ealth Activities tions nvelope ementation n Serveur et accessoires (On duleur grande capacité) pour la digitalisation. ML-M-APUHC-337056-GO-RF Strengthening Community H Request for Quota Single Stage - One E Q / Acquisition de matériels a IDA / D4420 Post Limited 11,500.00 0.00 Canceled 2023-03-07 2023-05-02 2023-06-06 ealth Activities tions nvelope udiovisuels pour l'ONASER. ML-M-APUHC-349197-GO-RF B / Achat et mise en place la farine nutritionnelle pour la Strengthening Community H Single Stage - One E Pending Impl IDA / D4420 Post Request for Bids Open - National 635,000.00 0.00 2023-03-15 2023-03-30 2023-05-04 2023-06-03 2023-07-24 2023-11-21 prise en charge des cas de m ealth Activities nvelope ementation alnutrition aiguë modérée de 30 enfants MAM de ménages vulnérables ML-M-APUHC-349208-GO-RF Strengthening Community H Request for Quota Single Stage - One E Pending Impl Q / Acquisition de matériels a IDA / D4420 Post Limited 20,830.00 0.00 2023-04-04 2023-05-30 2023-07-04 ealth Activities tions nvelope ementation udiovisuels pour l'ONASR et l e CNIECS NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-M-APUHC-174696-NC-RF Strengthening Stewardship f Q / Traduction du PAD du Pro Request for Quota Single Stage - One E IDA / D4420 or Improved Health System Post Limited 5,000.00 4,671.43 Signed 2020-06-01 2020-08-12 2020-07-27 2020-12-30 2021-01-23 jet ''Accélérer les Progrès ver tions nvelope Performance s la Couverture Sanitaire Uni verselle'' PACSU ML-M-APUHC-185722-NC-RF B / Réprographie de carnets Strengthening Community H Single Stage - One E IDA / D4420 Post Request for Bids Open - National 250,000.00 263,644.75 Signed 2020-09-10 2020-10-19 2020-09-20 2020-10-20 2020-11-19 2020-11-10 2020-11-19 2020-12-31 2021-02-02 2021-03-01 de suivi de la croissance pou ealth Activities nvelope r fille et pour garçon ML-M-APUHC-185750-NC-RF Q / Confection de dépliants s ur la PF et livret sur les argu Strengthening Community H Request for Quota Single Stage - One E Pending Impl IDA / D4420 Post Open - National 95,000.00 0.00 2020-08-13 2020-11-05 2021-01-04 mentaires des réligieux sur l ealth Activities tions nvelope ementation a PF et Cartes de Conseil Jigu i Sigui et pour les agents au niveau communautaire ML-M-APUHC-228131-NC-RF Q / Produire des affiches mur Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl ales et dépliants sur les VBG IDA / D4420 or Improved Health System Post Limited 20,000.00 0.00 2021-05-14 2021-07-11 2021-08-10 tions nvelope ementation , les SEC, la Nutrition, la PF e Performance t le MGP dans la langues loca les ML-M-APUHC-228244-NC-RF Strengthening Stewardship f Q / Confection de registres, p Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 16,666.00 0.00 2021-05-18 2021-07-20 2021-08-19 our l'enregistrement des Plai tions nvelope ementation Performance ntes au profit des CGP ML-M-APUHC-233695-NC-RF Strengthening Stewardship f Q / Produire un kit de spots vi Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 36,667.00 0.00 2021-06-17 2021-08-28 2021-09-27 déo et radio sur les VBG, les tions nvelope ementation Performance SEC, la Nutrition et la PF ML-M-APUHC-275689-NC-RF B / Reprographie de 120 000 exemplaires de fiches de pris e en charge révisées de l'enf Strengthening Community H Single Stage - One E Pending Impl IDA / D4420 Post Request for Bids Open - National 119,502.00 0.00 2022-02-28 2022-03-10 2022-04-09 2022-04-30 2022-06-11 2022-09-09 ant malade par les ASC, 900 ealth Activities nvelope ementation exemplaires du cahier de l'A SC révisés et 900 exemplaire s du guide de mise en œuvre de l'ASC révisé ML-M-APUHC-275694-NC-RF Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl Q / Production de 04 bulletins IDA / D4420 or Improved Health System Post Limited 13,330.00 0.00 2022-02-27 2022-04-10 2023-01-10 tions nvelope ementation trimestriels Performance ML-M-APUHC-275703-NC-RF Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl Q / Production de 3 films insti IDA / D4420 or Improved Health System Post Limited 36,665.00 0.00 2022-03-27 2022-05-22 2022-06-21 tions nvelope ementation tutionnels sur le PACSU Performance ML-M-APUHC-278088-NC-RF Strengthening Stewardship f Q / Acquisition de Logiciel po Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 29,165.00 0.00 2022-03-30 2022-05-25 2022-07-09 ur l'interopérabilité entre le tions nvelope ementation Performance DHIS2 du SNIS et du Portail F BR ML-M-APUHC-334689-NC-RF Strengthening Community H Request for Quota Single Stage - One E Pending Impl Q / Reprographie des registre IDA / D4420 Post Open - National 99,995.00 0.00 2023-02-17 2023-05-21 2023-07-05 ealth Activities tions nvelope ementation s PF, SONU, PCIME, PTME révi sés. ML-M-APUHC-334690-NC-RF Strengthening Community H Request for Quota Single Stage - One E Q / Confection des outils / su IDA / D4420 Post Open - National 87,000.00 0.00 Canceled 2023-03-06 2023-06-19 2023-08-03 ealth Activities tions nvelope pports de plaidoyer sur le SR MNIA-Nut. ML-M-APUHC-334709-NC-RF Strengthening Stewardship f Q / Production et impression Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 40,000.00 0.00 2023-05-25 2023-07-09 2024-01-05 de 4 bulletins trimestriels et tions nvelope ementation Performance de 20 succès story ML-M-APUHC-334712-NC-RF Strengthening Stewardship f Request for Quota Single Stage - One E Pending Impl Q / Réalisation de 3 films doc IDA / D4420 or Improved Health System Post Limited 41,500.00 0.00 2023-06-02 2023-07-17 2023-08-31 tions nvelope ementation umentaires thématiques de c Performance apitalisation. ML-M-APUHC-334717-NC-RF Strengthening Stewardship f Q / Production d'un kit d'infor Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 41,500.00 0.00 2023-05-14 2023-06-28 2023-12-25 mation et de sensibilisation s tions nvelope ementation Performance ur les BVG, MPG, Nutrition et PF. ML-M-APUHC-334722-NC-RF Strengthening Stewardship f Q / Recrutement d'une agenc Request for Quota Single Stage - One E Pending Impl IDA / D4420 or Improved Health System Post Limited 38,000.00 0.00 2023-06-15 2023-07-30 2023-10-28 e pour la campagne de mobil tions nvelope ementation Performance isation sociale en faveur du F BR. Page 3 ML-M-APUHC-349206-NC-RF Q / Multiplication des outils d Strengthening Community H Request for Quota Single Stage - One E Pending Impl IDA / D4420 Post Limited 40,000.00 0.00 2023-05-11 2023-07-06 2023-08-05 e communication et de plaid ealth Activities tions nvelope ementation oyer de la DGS/HP CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-M-APUHC-162226-CS-CQ Strengthening Health Servic S / Évaluation sur l'enregistre Quality And Cost- IDA / D4420 e Delivery through Performa Post Open - National 150,000.00 0.00 Under Review 2020-04-15 2020-03-17 2020-04-29 2020-06-17 2020-06-24 2020-07-09 2020-08-06 2020-09-10 2021-01-08 ment des données d'état civil Based Selection nce Based Financing et de statistiques vitales ML-M-APUHC-162227-CS-QC Strengthening Health Servic Quality And Cost- BS / Etude sur les qualités de IDA / D4420 e Delivery through Performa Post Open - National 150,000.00 0.00 Canceled 2020-04-27 2020-05-11 2020-06-29 2020-07-06 2020-07-21 2020-08-18 2020-09-22 2021-01-20 Based Selection s services de planning familia nce Based Financing l ML-M-APUHC-162228-CS-QC Strengthening Stewardship f Least Cost Selecti BS / Audit externe du projet IDA / D4420 or Improved Health System Post Open - National 85,000.00 21,062.58 Signed 2020-05-04 2020-03-11 2020-05-25 2020-07-08 2020-06-11 2020-08-05 2020-09-02 2020-09-04 2020-09-02 2020-10-09 2020-10-07 2020-11-13 2020-11-19 2023-11-13 on pour les 3 premières années Performance ML-M-APUHC-162155-CS-QC BS / Prestations d’Agence ch Strengthening Health Servic Quality And Cost- Open - Internationa argée des contrats et de la v IDA / D4420 e Delivery through Performa Prior 6,000,000.00 0.00 Canceled 2020-03-16 2020-04-21 2020-04-06 2020-05-11 2020-06-08 2020-07-08 2020-08-12 2020-09-24 2023-09-24 Based Selection l érification FBR pour les régio nce Based Financing ns de Ségou, Mopti et Gao ML-M-APUHC-275690-CS-QC BS / Recrutement d'un cabin Strengthening Health Servic Quality And Cost- Under Implement et de Consultants pour l'audit IDA / D4420 e Delivery through Performa Post Open - National 174,251.00 0.00 2022-03-04 2022-02-10 2022-03-19 2022-04-17 2022-05-15 2022-06-05 2022-07-10 2022-08-14 2022-10-13 Based Selection ation externe des résultats et du r nce Based Financing espect des procédures du FB R ML-M-APUHC-275699-CS-CQ S / Recrutement d'un cabinet Strengthening Stewardship f Consultant Qualifi Under Implement pour le Suivi et la surveillanc IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2022-03-15 2022-03-04 2022-03-29 2022-04-12 2022-05-17 2023-02-01 cation Selection ation e des mesures environneme Performance ntales et sociales pour l'amé nagement du site de DIO ML-M-APUHC-315976-CS-CQ Strengthening Stewardship f S / Etude complémentaire su Consultant Qualifi Under Implement IDA / D4420 or Improved Health System Post Limited 60,967.00 0.00 2022-09-20 2022-09-19 2022-10-20 2022-11-19 2022-12-25 2023-02-08 r le financement du Régime cation Selection ation Performance d'Assurance Maladie Univers elle (RAMU) ML-M-APUHC-334727-CS-QC Strengthening Stewardship f BS / Recrutement d'un consul Quality And Cost- Under Implement IDA / D4420 or Improved Health System Post Open - National 125,000.00 0.00 2023-02-10 2023-05-04 2023-03-03 2023-04-16 2023-05-26 2023-06-10 2023-07-22 2023-09-04 2023-11-03 tant pour réaliser une étude Based Selection ation Performance actuarielle sur le RAMED Strengthening Stewardship f ML-M-APUHC-334742-CS-CQ Consultant Qualifi Pending Impleme IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2023-08-09 2023-08-23 2023-09-22 2023-10-27 2024-01-25 S / Evaluation finale du Projet cation Selection ntation Performance ML-M-APUHC-334741-CS-CQ Strengthening Stewardship f Quality And Cost- S / Audit Externe des exercic IDA / D4420 or Improved Health System Post Open - National 24,500.00 0.00 Canceled 2023-07-12 2023-08-02 2023-09-16 2023-10-07 2023-10-22 2023-11-21 2023-12-27 2024-06-24 Based Selection es 2022 , 2023 et clôture du Performance Projet ML-M-APUHC-349200-CS-QC Strengthening Stewardship f Quality And Cost- Pending Impleme BS / Audit Externe des exerci IDA / D4420 or Improved Health System Post Open - National 24,250.00 0.00 2023-07-12 2023-08-02 2023-09-01 2023-10-01 2023-10-16 2023-11-21 2023-12-27 2024-06-24 Based Selection ntation ces 2022 , 2023 et clôture d Performance u Projet INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-M-APUHC-154325-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Assistant Suivi Évaluation IDA / D4420 or Improved Health System Post Open 36,000.00 0.00 2020-01-17 2020-02-02 2020-03-06 2021-03-05 2020-03-27 2020-04-17 2021-04-16 ant Selection ation pour l'UCP Performance Strengthening Stewardship f ML-M-APUHC-154327-CS-IND Individual Consult IDA / D4420 or Improved Health System Post Open 30,000.00 0.00 Under Review 2020-01-17 2020-02-02 2020-03-06 2020-03-27 2020-04-17 2021-04-16 V / Comptable UCP ant Selection Performance ML-M-APUHC-157075-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Spécialiste en Santé Com IDA / D4420 or Improved Health System Post Open 45,000.00 0.00 2020-02-14 2020-03-11 2020-03-28 2020-04-11 2020-05-02 2021-05-02 ant Selection ation munautaire UGP Performance ML-M-APUHC-157076-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Spécialiste en Communic IDA / D4420 or Improved Health System Post Open 40,000.00 0.00 2020-02-14 2020-03-11 2020-03-28 2020-04-11 2020-05-02 2021-05-02 ant Selection ation ation UGP Performance ML-M-APUHC-157068-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Assistant de Direction UG IDA / D4420 or Improved Health System Post Open 15,000.00 0.00 2020-02-14 2020-03-13 2020-03-28 2020-04-11 2020-05-02 2021-05-02 ant Selection ation P Performance Strengthening Stewardship f ML-M-APUHC-157062-CS-IND Individual Consult Under Implement IDA / D4420 or Improved Health System Post Open 50,000.00 0.00 2020-03-11 2020-03-11 2020-04-24 2020-05-15 2020-06-05 2020-07-11 V / Coordinateur CTN ant Selection ation Performance ML-M-APUHC-157073-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Spécialiste Suivi-Evaluatio IDA / D4420 or Improved Health System Post Open 40,000.00 0.00 2020-03-23 2020-03-11 2020-05-05 2020-05-19 2020-06-09 2021-06-09 ant Selection ation n CTN Performance ML-M-APUHC-157070-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Spécialiste FBR Internatio IDA / D4420 or Improved Health System Post Open 75,000.00 0.00 2020-03-23 2020-03-11 2020-05-05 2020-05-19 2020-06-09 2021-06-09 ant Selection ation nal CTN Performance ML-M-APUHC-157050-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Spécialiste FBR National C IDA / D4420 or Improved Health System Post Open 40,000.00 0.00 2020-03-23 2020-03-11 2020-05-05 2020-05-19 2020-06-09 2021-06-09 ant Selection ation TN Performance ML-M-APUHC-157074-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Spécialiste en Base de do IDA / D4420 or Improved Health System Post Open 40,000.00 0.00 2020-03-23 2020-03-13 2020-05-05 2020-05-19 2020-06-09 2021-06-09 ant Selection ation nnées CTN Performance Page 4 ML-M-APUHC-157072-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Assistant Administratif CT IDA / D4420 or Improved Health System Post Open 15,000.00 0.00 2020-03-27 2020-03-13 2020-05-09 2020-05-23 2020-06-13 2021-06-13 ant Selection ation N Performance ML-M-APUHC-157052-CS-IND Strengthening Health Servic V / Assistance technique pou Individual Consult IDA / D4420 e Delivery through Performa Post Open 40,000.00 0.00 Canceled 2020-02-15 2020-02-24 2020-03-30 2020-04-14 2020-05-19 2020-06-18 r les Etudes de base d’évalua ant Selection nce Based Financing tion d'Impact et de SDI ML-M-APUHC-157048-CS-CD Strengthening Health Servic S / Conception du Portail FBR IDA / D4420 e Delivery through Performa Post Direct Selection Direct 200,000.00 199,969.00 Signed 2020-02-17 2020-02-24 2020-02-27 2020-04-02 2020-05-02 2020-10-06 2020-10-29 et Transfert de compétences nce Based Financing ML-M-APUHC-157053-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Evaluation des Coûts des IDA / D4420 or Improved Health System Post Open 40,000.00 0.00 2020-04-02 2020-03-06 2020-05-16 2020-05-31 2020-07-05 2020-09-03 ant Selection ation prestations des soins de Sant Performance é Primaires ML-M-APUHC-157079-CS-CD S / Assistance technique au F Strengthening Health Servic Pending Impleme BR par une Agence de Contra IDA / D4420 e Delivery through Performa Prior Direct Selection Direct 3,000,000.00 0.00 2020-02-28 2020-03-13 2020-05-25 2020-11-21 ntation ctualisation et de vérification nce Based Financing dans la Région de Koulikoro Strengthening Stewardship f ML-M-APUHC-157061-CS-IND Individual Consult IDA / D4420 or Improved Health System Post Open 40,000.00 0.00 Canceled 2020-02-01 2020-03-15 2020-03-29 2020-04-19 2021-04-19 V / Spécialiste FBR UGP ant Selection Performance ML-M-APUHC-157090-CS-IND Strengthening Stewardship f Individual Consult Pending Impleme V / Spécialiste des Sauvegard IDA / D4420 or Improved Health System Post Open 40,000.00 0.00 2020-02-02 2020-03-16 2020-03-30 2020-04-20 2021-04-20 ant Selection ntation es Performance Strengthening Stewardship f ML-M-APUHC-157071-CS-IND Individual Consult Under Implement IDA / D4420 or Improved Health System Post Open 40,000.00 0.00 2020-03-11 2020-03-11 2020-04-23 2020-05-07 2020-05-28 2021-05-28 V / Coordinateur Adjoint CTN ant Selection ation Performance ML-M-APUHC-157058-CS-CD Strengthening Health Servic S / Etude sur les Indicateurs IDA / D4420 e Delivery through Performa Post Direct Selection Direct 750,000.00 814,586.80 Signed 2020-03-02 2020-02-24 2020-03-16 2020-04-20 2020-05-28 2021-01-09 2020-11-24 de Prestataires de services nce Based Financing ML-M-APUHC-169846-CS-CD S / Assistance technique pour Strengthening Health Servic Pending Impleme les Agences de Contractualis IDA / D4420 e Delivery through Performa Prior Direct Selection Direct 4,500,000.00 0.00 2020-04-27 2020-05-11 2020-07-08 2023-05-31 ntation ation et de Vérification des ré nce Based Financing gions de Segou, Mopti et Gao ML-M-APUHC-174694-CS-IND V / RECRUTEMENT D’UN CON Strengthening Stewardship f Individual Consult Under Implement SULTANT POUR L’ELABORATI IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2020-05-26 2020-07-12 2020-06-02 2020-06-30 2020-08-05 2020-09-24 ant Selection ation ON DU CADRE DE GESTION E Performance NVIRONNEMENTALE ET SOCI ALE DU PROJET PACSU ML-M-APUHC-157078-CS-CD Strengthening Health Servic S / Evaluation D’Impact du F IDA / D4420 e Delivery through Performa Post Direct Selection Direct 750,000.00 0.00 Canceled 2020-03-02 2020-02-24 2020-03-16 2020-05-28 2020-11-24 BR au Mali nce Based Financing ML-M-APUHC-185755-CS-IND Strengthening Stewardship f Individual Consult Under Implement V / Actualiser le plan de gesti IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2020-09-23 2020-09-25 2020-09-28 2020-10-19 2020-11-23 2020-12-23 ant Selection ation on des déchets biomédicaux Performance ML-M-APUHC-187471-CS-IND Strengthening Stewardship f V / Recruter un consultant po Individual Consult Under Implement IDA / D4420 or Improved Health System Post Limited 50,000.00 0.00 2020-09-03 2020-10-26 2020-09-17 2020-10-08 2020-11-12 2020-12-27 ur l'analyse de l'espace fiscal ant Selection ation Performance pour le dossier d'investissem ent GFF ML-M-APUHC-189156-CS-CD Strengthening Stewardship f Pending Impleme S / Baseline de l'Etude d'Eval IDA / D4420 or Improved Health System Post Direct Selection Direct 50,000.00 0.00 2020-12-02 2020-12-12 2021-02-15 2021-04-01 ntation uation d'impact FBR Performance ML-M-APUHC-211953-CS-CD Strengthening Stewardship f Pending Impleme S / Reconduction du contrat IDA / D4420 or Improved Health System Post Direct Selection Direct 132,000.00 0.00 2021-01-08 2021-01-18 2021-02-04 2023-12-26 ntation du spécialiste en Suivi-Evalu Performance ation du PACSU ML-M-APUHC-211955-CS-CD Strengthening Health Servic S / Reconduction du contrat Pending Impleme IDA / D4420 e Delivery through Performa Post Direct Selection Direct 138,000.00 0.00 2021-01-04 2021-01-14 2021-01-31 2023-12-27 de la spécialiste en passation ntation nce Based Financing des marchés du PACSU ML-M-APUHC-211959-CS-CD Strengthening Health Servic S / Reconduction du contrat Pending Impleme IDA / D4420 e Delivery through Performa Post Direct Selection Direct 114,042.00 0.00 2021-01-15 2021-01-25 2021-02-11 2023-12-30 de la spécialiste en sauvegar ntation nce Based Financing de environnementale et soci ale du PACSU ML-M-APUHC-228134-CS-IND Strengthening Stewardship f V / Conceptualiser et mettre Individual Consult Under Implement IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2021-05-26 2021-05-27 2021-06-10 2021-07-01 2021-08-06 2021-09-20 en place un logiciel pour la g ant Selection ation Performance estion des Plaintes ML-M-APUHC-228136-CS-IND V / Mener une recherche opé Strengthening Stewardship f rationnelle sur l'éfficacité de l Individual Consult Pending Impleme IDA / D4420 or Improved Health System Post Limited 24,166.00 0.00 2021-05-28 2021-06-12 2021-06-27 2021-08-08 2021-09-22 a farine nutriblé dans la prise ant Selection ntation Performance en charge des enfants malnu tris aigus modérés de 6-59 m ois ML-M-APUHC-228138-CS-IND Strengthening Stewardship f V / Elaboration d’une EIES/NI Individual Consult Under Implement IDA / D4420 or Improved Health System Post Limited 11,660.00 0.00 2021-04-27 2021-05-21 2021-05-12 2021-05-27 2021-06-19 2021-08-03 ES pour l’installation d’un inc ant Selection ation Performance inérateur à Dio en faveur de l a DPM ML-M-APUHC-238896-CS-CD Strengthening Stewardship f Under Implement S / Evaluation d'impact à mi- IDA / D4420 or Improved Health System Post Direct Selection Direct 750,000.00 0.00 2021-07-05 2022-03-16 2021-07-26 2021-12-08 2022-04-07 ation parcours du FBR Performance ML-M-APUHC-240587-CS-CD Strengthening Stewardship f S / Reconduction du contrat Pending Impleme IDA / D4420 or Improved Health System Post Direct Selection Direct 117,817.00 0.00 2021-06-25 2021-07-07 2021-08-03 2023-12-26 du spécialiste en gestion fina ntation Performance ncière du PACSU ML-M-APUHC-240590-CS-CD Strengthening Stewardship f S / Reconduction du contrat Pending Impleme IDA / D4420 or Improved Health System Post Direct Selection Direct 132,884.00 0.00 2021-06-25 2021-07-05 2021-07-31 2023-12-23 du spécialiste en santé com ntation Performance munautaire du PACSU Page 5 ML-M-APUHC-240595-CS-CD Strengthening Stewardship f Pending Impleme S / Reconduction du contrat IDA / D4420 or Improved Health System Post Direct Selection Direct 102,302.00 0.00 2021-06-25 2021-07-05 2021-07-31 2023-12-23 ntation du spécialiste en communica Performance tion du PACSU ML-M-APUHC-240598-CS-CD Strengthening Stewardship f Pending Impleme S / Reconduction du contrat IDA / D4420 or Improved Health System Post Direct Selection Direct 102,302.00 0.00 2021-06-25 2021-07-05 2021-07-31 2023-12-23 ntation de l'auditeur interne du PACS Performance U ML-M-APUHC-240600-CS-CD Strengthening Stewardship f Pending Impleme S / Reconduction du contrat IDA / D4420 or Improved Health System Post Direct Selection Direct 323,530.00 0.00 2021-06-25 2021-07-05 2021-08-03 2023-12-26 ntation de l'assistant administratif d Performance u PACSU ML-M-APUHC-275695-CS-IND V / Recrutement d'un Consult Strengthening Community H Individual Consult Under Implement IDA / D4420 Post Limited 25,000.00 0.00 2022-03-24 2022-05-18 2022-03-29 2022-04-19 2022-05-18 2022-07-02 ant National pour l'intégratio ealth Activities ant Selection ation n des indicateurs SRMNEA-N ut ML-M-APUHC-275698-CS-IND Strengthening Stewardship f V / Recrutement d'un Consult Individual Consult Under Implement IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2022-03-18 2022-02-28 2022-03-23 2022-04-13 2022-05-12 2022-06-26 ant National pour la mise à j ant Selection ation Performance our de la Carte sanitaire digit al ML-M-APUHC-278097-CS-IND V / Actualisation du plan de c Strengthening Stewardship f Individual Consult Pending Impleme ommunication et identifier le IDA / D4420 or Improved Health System Post Limited 13,330.00 0.00 2022-04-05 2022-04-26 2022-05-10 2022-06-07 2022-07-22 ant Selection ntation s stratégies de communicatio Performance n pour la pérennisation du FB R ML-M-APUHC-329410-CS-IND V / Recrutement d’un Consult Strengthening Stewardship f ant pour réaliser l'évaluation Individual Consult Under Implement IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2022-12-07 2022-12-05 2022-12-21 2023-01-11 2023-01-25 2023-03-11 des risques de sécurité (ERS) ant Selection ation Performance et le plan de gestion de sécu rité des zones d'intervention du projet (PGS) ML-M-APUHC-334729-CS-IND V / Analyse de données pour Strengthening Stewardship f Individual Consult réaliser une étude à partir de IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 Canceled 2023-03-07 2023-03-22 2023-04-12 2023-05-17 2023-07-01 ant Selection s données du portail FBR sur Performance la disponibilité RH, sécurité e t la qualité des services. ML-M-APUHC-334732-CS-IND V / Recrutement d'un consult Strengthening Stewardship f Individual Consult Pending Impleme ant pour le contrôle et le Suiv IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2023-07-17 2023-07-27 2023-08-17 2023-09-21 2023-12-20 ant Selection ntation i des travaux d’aménagemen Performance t du site de l’incinérateur. ML-M-APUHC-334733-CS-IND Strengthening Stewardship f V / Etude sur la capitalisation Individual Consult IDA / D4420 or Improved Health System Post Limited 50,000.00 0.00 Canceled 2023-03-15 2023-04-05 2023-05-05 2023-06-14 2023-08-13 de l'expérience FBR en prena ant Selection Performance nt en compte le budget d'éta t. ML-M-APUHC-334734-CS-IND Strengthening Stewardship f V / Recrutement d'un consult Individual Consult Pending Impleme IDA / D4420 or Improved Health System Post Limited 15,000.00 0.00 2023-03-24 2023-04-03 2023-04-24 2023-05-22 2023-07-06 ant pour la conception d'un o ant Selection ntation Performance util de plaidoyer pour la pére nnisation du FBR. ML-M-APUHC-334736-CS-IND V / Actualisation de la notice Strengthening Stewardship f d'impacts environnemental e Individual Consult Under Implement IDA / D4420 or Improved Health System Post Limited 11,000.00 0.00 2023-02-02 2023-01-26 2023-02-12 2023-02-26 2023-03-18 2023-04-02 t social (NIES) du projet d'inst ant Selection ation Performance allation de l'incinérateur dan s le cadre de l'aménagement du site de l’incinérateur. ML-M-APUHC-334737-CS-IND Strengthening Stewardship f Individual Consult V / Recrutement d'un Consult IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 Canceled 2023-02-27 2023-03-10 2023-03-09 2023-03-30 2023-04-19 2023-06-03 ant Selection ant pour l'interopérabilité Op Performance en Clinic. ML-M-APUHC-334738-CS-IND Strengthening Stewardship f V / Recrutement d'un Consult Individual Consult Under Implement IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2023-03-15 2023-04-24 2023-03-25 2023-04-15 2023-05-20 2023-07-04 ant pour la révision des Clés ant Selection ation Performance dans le cadre des comptes d e la santé. ML-M-APUHC-334726-CS-CD Strengthening Stewardship f Under Implement S / Réaliser l'évaluation finale IDA / D4420 or Improved Health System Post Direct Selection Direct - National 750,000.00 0.00 2023-01-25 2023-01-26 2023-02-14 2023-05-25 2023-10-22 ation d'impact du FBR Performance ML-M-APUHC-360134-CS-CD Strengthening Stewardship f Pending Impleme S / Reconduction du contrat IDA / D4420 or Improved Health System Post Direct Selection Direct - National 15,700.00 0.00 2023-05-04 2023-05-14 2023-07-18 2023-12-30 ntation du Comptable du PACSU Performance ML-M-APUHC-360138-CS-CD Strengthening Stewardship f Pending Impleme S / Reconduction du contrat IDA / D4420 or Improved Health System Post Direct Selection Direct - National 19,412.00 0.00 2023-05-04 2023-05-14 2023-07-18 2023-12-30 ntation de l'Assistante Suivi Évaluati Performance on du PACSU ML-M-APUHC-362201-CS-IND Strengthening Stewardship f V / Recruter un consultant po Individual Consult Under Implement IDA / D4420 or Improved Health System Post Limited 25,000.00 0.00 2023-05-25 2023-05-22 2023-06-01 2023-06-22 2023-07-27 2023-09-10 ur l'élaboration de la stratégi ant Selection ation Performance e de pérennisation du FBR Page 6 MINISTERE DE L’ENVIRONNEMENT REPUBLIQUE DE COTE ET DU DEVELOPPEMENT DURABLE D’IVOIRE Union-Discipline-Travail ---------------- -------------- PROJET D’INVESTISSEMENT FORESTIER Phase 2 ………………………………………. DRAFT DU PLAN DE PASSATION DES MARCHES Financement IDA Période : 2022 – 2023 Mai 2022 PLAN DE PASSATION DE MARCHÉS Page | 0 Information sur le Projet : Agence d’exécution du Projet : Date du plan de passation des marchés : Période couverte par ce plan de passation des marchés Niveau de risque évalué : Modéré Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marchés se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : ne s’applique pas Travaux ne s’applique pas Page | 1 II. Fournitures, Travaux et Services Assimilés 1. Seuils d'examen préalable : Marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions du paragraphe 3.5 et suivant du Règlement de Passation des Marchés pour les emprunteurs sollicitant le Financement de Projets d’Investissements (FPI). Nouveaux Seuils de Revue a priori de la Banque Mondiale – Effectifs depuis Juillet 2016 Categories de Niveau de risque du projet marchés Risque élevé Risque Risque Risque Bas - - Substantiel - Modéré - Tout marché de Tout marché Tout marché de Tout marché … estimé égal de … estimé … estimé égal de … estimé ou supérieur à : égal ou ou supérieur à : égal ou supérieur à : supérieur à : Travaux (incluant clé à main, Fourniture et $5,000,000 $10,000,000 $15,000,000 $20,000,000 Installation, et les Partenariat Public - Privé -PPP) Biens, Système d’Information et de Services autres que $1,500,000 $2,000,000 $4,000,000 $6,000,000 les Services intellectuels 2. Préqualification : N/A1 3. Procédures applicables aux Composantes relatives au Développement Conduit par les Communautés (en relation avec le paragraphe 3.17 des Directives) : N/A 4. Référence (si nécessaire) au Manuel opérationnel de passation de marchés : N/A 5. Autres arrangements spécifiques pour la passation de marchés : Non Applicable 6. Marchés et Planning et Méthode de Passation : 1 Non Applicable Page | 2 I. Travaux, Fourniture et Services Assimilés 2.1. Seuils d’examen préalable Les marchés qui seront soumis à l'examen préalable de la banque conformément aux dispositions relatives aux nouveaux seuil de revue de la Banque mondiale. Contrats soumis Valeur seuil Nature des Méthode de passation à examen du marché $ dépenses de marchés préalable de US l’IDA 1. Travaux AOI ≥ 10,000,000 (y compris clés en AON < 10,000,000 Tous les contrats main, Fourniture et Demande de cotation – < 200,000 de 15.000.000 $US montage au moins 3 offres et plus d’installations et Entente Directe (*) PPP) Pas de seuil 2. Fournitures, AOI ≥ 1,000,000 Tous les contrats Systèmes AON < 1,000,000 ≥ 4.000.000 $US Page | 3 d’Informations Consultation de et Services Fournisseurs à l’échelle < 100,000 autres que les Nationale - Au moins 3 services de offres Consultants Consultation de Fournisseurs à l’échelle Nationale - Au moins 3 < 500,000 offres pour les véhicules et le carburant Entente directe (*) Pas de seuil (*) Le justificatif de toute entente directe doit être transmis avec le PPM à la Direction des Marchés Publics pour une autorisation préalable de passer marché par cette méthode 2.2. Référence (si nécessaire) au Manuel opérationnel/de passation de marchés :  Manuel de procédure en matière de passation des marchés Page | 4 2.3. Contrats de Travaux, fournitures et services assimilés avec Méthode de sélection et planning 2.3.1 Type de marchés : Travaux 1 2 3 4 5 6 7 8 9 Métho Préféren Examen de de Pré- ce Date de Montant (a passati qualificati national signatur Réf Contrat estimatif priori/a Commentaires on de on e e du . (Description) (en $ US) posterio march (oui/non) (oui/non contrat ri) és ) à Réhabilitation pistes 10/11/ 1 3 460 000 AON Non Non posterior 2 lots : C3.1 & C2.1 d'accès 2023 i Réhabilitation base- vies/postes de contrôle à 1 815 1/08/202 3 lots : C2.1 ; C2.2 2 FC C3 + réhabilitation AON Non Non posterior 000 3 & C3.1 base-vie pour centre i formation à Réalisation de forages et 09/06/20 3 93 400 DC Non Non posterior retenues d'eau 23 i Convention avec l’ONG N’ZI River pour la à construction de la clôture 22/05/20 Recommandations 4 740 000 SED Non N/A posterior électrique de MAFA et 23 PAD. i Besse-Boko 6 108 Sous-total travaux 400 Page | 5 2.3.2. Type de marchés : Fournitures 1 2 3 4 5 6 7 8 9 Méthod Préféren Examen Montant e de Date de Pré- ce (a Contrat estimatif passati signature Commentaire Réf qualificatio national priori/a (Description) (en $ on des du s . n (oui/non) e posterio US) marché contrat (oui/non) ri) s Commande avec UNOPS pour la fourniture des véhicules de SED avec à patrouille, de transport de 2 590 20/11/202 UNOPS 3 lots : 1 SED Non N/A posterior troupes et de liaison, motos et 700 3 C2.2 ; C3.1 & i les drones, matériel de C5.1 navigation (hors-bord) à Achat de tablettes pour 49 280 03/04/202 2 DC Non Non posterior surveillance 3 i à Achat de matériel technique 44 800 03/04/202 3 DC Non Non posterior (GPS) 3 i à 4 Acquisition de carburant 495 000 DC Non Non posterior 1/06/2023 i à Achat de Tricycles 03/04/202 5 9 340 DC Non Non posterior 3 i à Achat de Petits matériels 01/06/202 6 46 700 DC Non Non posterior 3 i Page | 6 2.3.2. Type de marchés : Fournitures 1 2 3 4 5 6 7 8 9 Méthod Préféren Examen Montant e de Date de Pré- ce (a Contrat estimatif passati signature Commentaire Réf qualificatio national priori/a (Description) (en $ on des du s . n (oui/non) e posterio US) marché contrat (oui/non) ri) s à Achat de sachet pour 1 809 10/08/202 7 AOI Non Non posterior pépinière des plants 600 3 i à 31/03/202 8 Achat d’ordinateurs 32 000 DC Non Non posterior 3 i à Achat de photocopieuses 12 000 10/11/202 9 DC Non Non posterior 2 i à Achat de fourniture de bureau 60 000 31/03/202 10 DC Non Non posterior 3 i Achat de consommables à 50 000 31/03/202 11 informatiques DC Non Non posterior 3 i Acquisition d'équipements de à 20 000 01/08/202 12 communication DC Non Non posterior 3 i Acquisition de matériels et à équipements pour les agents 80 000 01/08/202 13 DC Non Non posterior de surveillance 3 i Acquisition de matériel pour le à 80 000 01/08/202 14 suivi écologique DC Non Non posterior 3 i Page | 7 2.3.2. Type de marchés : Fournitures 1 2 3 4 5 6 7 8 9 Méthod Préféren Examen Montant e de Date de Pré- ce (a Contrat estimatif passati signature Commentaire Réf qualificatio national priori/a (Description) (en $ on des du s . n (oui/non) e posterio US) marché contrat (oui/non) ri) s 5 379 Sous-total fourniture 420 2.3.3 Type de marchés : Services assimilés 1 2 3 4 5 6 7 8 9 Méthode Pré- Préféren Examen Date de Montant de qualific ce (a priori/a signature Réf Contrat estimatif passatio ation national posteriori du . (Description) en $ US n de (oui/non e Commentaires ) contrat marchés ) (oui/non) Recrutement d’un prestataire pour à 01/08/20 1 la production de support de 100 000 AON Non Non communication postériori 23 Convention avec les Convention avec les radios de à 01/02/20 radios locales avec 2 proximité 168 750 SED Non N/A postériori 23 recommandations PAD Recrutement d'une agence de à 01/08/20 3 80 000 DC Non Non communication postériori 23 Convention avec Care 56 000 à 01/02/20 4 International pour la mise en SED Non N/A C3.2 postériori 23 œuvre des AGR Page | 8 2.3.3 Type de marchés : Services assimilés 1 2 3 4 5 6 7 8 9 Méthode Pré- Préféren Examen Date de Montant de qualific ce (a priori/a signature Réf Contrat estimatif passatio ation national posteriori du . (Description) en $ US n de (oui/non e Commentaires ) contrat marchés ) (oui/non) Recrutement d’un prestataire pour à 15/12/202 5 l’édition et la vulgarisation des 50 000 DC Non Non Posteriori 3 PAPF Convention avec Convention avec l’OIREN pour le A 01/02/20 l’OIREN avec 6 suivi indépendant des activités du 60 000 SED Non N/A Postériori 23 recommandations projet PAD Convention avec un prestataire A 03/01/20 7 pour la fourniture de connexion 60 000 SED Non N/A Postériori 23 internet A 03/01/20 8 Entretien de matériel roulant 60 000 DC Non N/A Postériori 23 Convention avec MTN (opérateur Selon A 03/01/20 9 GSM) pour les paiements basés sur 300 000 SED Non N/A recommandations Postériori 23 les résultats PAD 934 Sous-total services assimilés 750 Page | 9 III. Sélection de Consultants 1. Seuil d'examen préalable : Nouveaux Seuils de Revue a priori de la Banque Mondiale – Effectifs depuis Juillet 2016 Catégorie de Niveau de risque du projet marchés Risque Risque Risque Risque Bas - élevé - Substantiel - Modéré - Tout marché de … Tout marché Tout marché de Tout marché estimé égal ou de … estimé … estimé égal de … estimé supérieur à : égal ou ou supérieur à : égal ou supérieur à : supérieur à : Services $500,000 $1,000,000 $2,000,000 $4,000,000 Consultant (Firmes) Consultant $200,000 $300,000 $400,000 $500,000 Individuel Nature de Méthode de passation Valeur Contrats soumis à examen dépenses de marchés seuil du préalable 2 SFQC : Sélection Fondée sur la Qualitécontrat et le Coût 3 SFQ : Sélection fondée sur la qualité $EU Consulta SFQC2, 4 SMC : Sélection SFQ3, coût au moindre SMC4, ≥ 300.000 nts SCBD5, 5 SCBD : Sélection dans le cadre d’un budget déterminé Firmes SFQC, SFQ, SMC, SCBD, 5 QC : Sélection < 300.000 Tout contrat de 2 000.000 $US QC5 basée sur les Qualifications des Consultants ou plus de d’Intérêt CI : Consultant Individuel : AMI : Avis à Manifestation Pas Selection directe seuil Page | 10 Consulta Consultant individuel ≥ 100.000 nts (AMI) Tout contrat de 400.000 $US ou plus Individuel Consultant individuel (3 < 100.000 s CV) Pas de Selection directe seuil Tous les TDRs, quelle que soit la valeur du contrat, sont soumis à examen préalable. Page | 11 3.2. Type de marchés : Services de consultants 1 2 3 4 5 6 7 8 Préfére Méthode Examen nce Date de Montant de (à nationa signature Réf Contrat estimatif passation priori/à Commentaires le du . (Description) en $ US de posterio (oui/no contrat marchés ri) n) Recrutement d’un cabinet pour SFQC Posterio 31/10/20 1 600 000 Non faire l’état de lieux des FC C4 /c ri 23 Recrutement d’un cabinet pour l’ Posterio 31/10/20 2 300 000 SMC Non élaboration des EIES ri 23 Recrutement d’un cabinet pour 31/10/202 3 réaliser une étude socio- SFQC Non Priori 3 économique 3 000 000 Recrutement d’un cabinet pour Posterio 15/08/202 4 réaliser l’ Etude/analyse des 100 000 SQC Non conflits sociaux ri 3 Recrutement d’un consultant individuel pour l’ élaboration d'une Posterio 15/08/202 5 CI / AMI Non stratégie de restauration des 100 000 ri 3 moyens de subsistance Recrutement d’un cabinet pour l’ élaboration du Plan Posterio 15/08/202 6 300 000 SFQ Non d’aménagement simplifié des ri 3 forets du domaine rural Convention avec les Universités C3.1 : Convention publiques pour le Suivi scientifique Posterio 15/11/202 7 80 000 SED Non avec les universités de la régénération des sites ri 3 Publiques orpaillées C3.1 : Convention Convention avec les Universités Posterio 15/11/202 8 200 000 SED Non avec les universités publiques pour le Suivi de la ri 3 Publiques Page | 12 3.2. Type de marchés : Services de consultants 1 2 3 4 5 6 7 8 Préfére Méthode Examen nce Date de Montant de (à nationa signature Réf Contrat estimatif passation priori/à Commentaires le du . (Description) en $ US de posterio (oui/no contrat marchés ri) n) pollution des eaux et du sol des zones orpaillées Convention avec les Universités C3.1 : Convention publiques une étude sur la Posterio 15/11/202 9 200 000 SED Non avec les universités dépollution des sites orpaillées ri 3 Publiques Recrutement d’un cabinet pour une formation en agroforesterie et mise Posterio 31/10/202 10 300 000 SFQC Non en œuvre ri 2 Recrutement d’un consultant pour la production des cartes Posterio 31/10/202 11 150 000 SQC Non d'occupation des sols ri 3 Recrutement d’un prestataire pour Posterio 15/06/202 12 la mise en place de la plateforme 300 000 SFQC Non digitale de gestion E&S et MGP ri 3 Recrutement d’un cabinet d’audit Posterio 15/06/202 Publication d’AMI 13 100 000 SQC Non externe ri 3 Recrutement d’un cabinet pour une Posterio 15/09/202 14 assistance technique International 1 000 000 SFQC Non pour l’agroforesterie ri 3 Recrutement d’un bureau de 30/06/202 15 2 000 000 SFQC Non Priori supervision pour le contrôle et la 3 Page | 13 3.2. Type de marchés : Services de consultants 1 2 3 4 5 6 7 8 Préfére Méthode Examen nce Date de Montant de (à nationa signature Réf Contrat estimatif passation priori/à Commentaires le du . (Description) en $ US de posterio (oui/no contrat marchés ri) n) supervision globale , le suivi de la mise en œuvre de toutes les activités du projet exécutées par SODEFOR, OIPR et Care ainsi que l’UIAP Recrutement d’un cabinet pour le 29/09/202 16 renforcement des capacités en 8 000 000 SFQC Non Priori 3 sauvegarde environnementales 16 730 TOTAL 000 Page | 14 IV. RECAPITULATION 4.1. Financement par catégorie d’acquisition Montant Montant Commentai N° Catégorie Nombre estimatif estimatif res ordre s Contrats $ US F CFA Travaux 4 6 108 3 054 200 000 RAS 1 400 Fournitures 14 5 379 2 689 710 000 RAS 2 420 Services 9 934 467 375 000 RAS 3 Assimilés 750 Consultants 16 16 730 8 365 000 000 RAS 4 000 29 152 TOTAL 43 570 14 576 285 000 Page | 15 PROCUREMENT Cote d'Ivoire : Forest Investment Project, phase 2 PLAN General Information Country: Cote d'Ivoire 2022-11-15 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175982 GPN Date: Project Name: Forest Investment Project, phase 2 Loan / Credit No: IDA / 71870 FOREST INVESTMENT PROJECT 2 Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CI-FIP2-362058-CW-RFQ-202 Component 5.Project Admini Request for Quota 3 / TRAVAUX D'AMENAGEME Request for Quota Single Stage - One E Pending Imp 2023-08-2 IDA / 71870 stration, Coordination, and S Post Limited tions (Non Bank-S 157,500.00 0.00 2023-05-25 2023-06-23 NT DU BATIMENT (PARKING, tions nvelope lementation 2 afeguards PD) REZ DE CHAUSSEE, BUREAU) DU PIF 2 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIP2-361718-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE MATERIE IDA / 71870 stration, Coordination, and S Post Limited 98,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 tions nvelope ementation LS DE BURAU POUR LE PIF 2 afeguards CI-FIP2-361741-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE MOBILIE IDA / 71870 stration, Coordination, and S Post Limited 98,000.00 0.00 2023-05-18 2023-06-16 2023-07-16 tions nvelope ementation RS DE BUREAU POUR LE PIF afeguards 2 CI-FIP2-361752-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE FOURNIT IDA / 71870 stration, Coordination, and S Post Limited 60,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 tions nvelope ementation URES DE BUREAU AU PROFIT afeguards DU PIF 2 CI-FIP2-361762-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE CONSOM IDA / 71870 stration, Coordination, and S Post Limited 50,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 tions nvelope ementation MABLES INFORMATIQUES AU afeguards PROFIT DU PIF 2 CI-FIP2-361767-GO-RFQ-202 Component 5.Project Admini 3 / ACQUISITION DE SYSTEME Request for Quota Single Stage - One E Pending Impl IDA / 71870 stration, Coordination, and S Post Limited 70,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 DE VIDEOSURVEILLANCE DES tions nvelope ementation afeguards LOCAUX AU PROFIT DU PIF 2 CI-FIP2-361787-GO-RFQ-202 Component 5.Project Admini 3 / ACQUISITION DE VISIO-CO Request for Quota Single Stage - One E Pending Impl IDA / 71870 stration, Coordination, and S Post Limited 40,000.00 0.00 2023-05-25 2023-06-23 2023-07-23 NFERENCE POUR LA SALLE D tions nvelope ementation afeguards E REUNION DU PIF 2 CI-FIP2-361861-GO-DIR-202 3 / ACQUISITION DE 02 VEHIC ULES DE SURVEILLANCES ( M Component 2. Support the I INEF) /27 VEHICULES , 03 DR mplementation of Participat Pending Impl ONES , 45 GPS , 20 BOUSSOL IDA / 71870 ory Forests Management Pla Prior Direct Selection Direct - National 3,430,600.00 0.00 2023-05-22 2023-05-25 2023-06-10 2023-09-08 ementation ES ,60 MOTOS pour la SODE ns in Category 3 GFs in the FOR/ 07 VEHICULES 4X4 et 3 Cocoa Belt 0 TABLETTES , 15 GPS pour l' OIPR/ 05 VEHICULES (UCP) et 08 VEHICULES PICK UP pour l'ANDE VIA UNOPS CI-FIP2-361781-GO-RFQ-202 Component 5.Project Admini 3 / ACQUISITION ET INSTALLA Request for Quota Single Stage - One E Pending Impl IDA / 71870 stration, Coordination, and S Post Limited 40,000.00 0.00 2023-05-29 2023-06-27 2023-07-27 TIONS DE STORES DANS LES tions nvelope ementation afeguards LOCAUX DU PIF 2 CI-FIP2-361750-GO-RFQ-202 Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl 3 / ACQUISITION DE MATERIE IDA / 71870 stration, Coordination, and S Post Limited 98,578.00 0.00 2023-05-25 2023-06-23 2023-07-23 tions nvelope ementation LS INFORMATIQUES AU PROFI afeguards T DU PIF 2 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIP2-336794-NC-RFQ / Re Component 5.Project Admini Request for Quota Single Stage - One E Pending Impl crutement d'un prestataire p IDA / 71870 stration, Coordination, and S Post Limited 70,000.00 0.00 2023-01-31 2023-02-27 2023-12-29 tions nvelope ementation our assurer le service de gar afeguards diennage CI-FIP2-337124-NC-RFQ / Re Component 5.Project Admini crutement d'un prestataire p Request for Quota Single Stage - One E Pending Impl IDA / 71870 stration, Coordination, and S Post Limited 98,000.00 0.00 2023-01-31 2023-02-27 2023-12-29 our assurer l'entretien des lo tions nvelope ementation afeguards caux du projet PIF 2 CI-FIP2-361961-NC-DIR-2023 / SELECTION DIRECTE AVEC Component 5.Project Admini ORANGE COTE D'IVOIRE POU Pending Impl IDA / 71870 stration, Coordination, and S Post Direct Selection Direct - National 53,000.00 0.00 2023-05-26 2023-05-29 2023-06-17 2023-08-01 R LA CONNEXION FIBRE OPTI ementation afeguards QUE , EQUIPEMENTS TELECO MMUNICATIONS ET INTERNET DES LOCAUX DU PIF 2 CI-FIP2-364396-NC-DIR-2023 / FOURNITURE ET INSTALLATI Component 5.Project Admini Pending Impl ON DES LOGICIELS TOM2PRO IDA / 71870 stration, Coordination, and S Post Direct Selection Direct - National 111,654.00 0.00 2023-06-02 2023-06-05 2023-06-24 2024-06-23 ementation ET TOM2PAIE AU PROFIT DU afeguards PROJET D'INVESTISSEMENT F ORESTIER 2 (PIF 2) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 CI-FIP2-326042-CS-QCBS-KR 22 / SELECTION D’UN CABINE T POUR LA CONCEPTION DE L Component 5.Project Admini Quality And Cost- Open - Internationa A PLATEFORME DIGITALE DE IDA / 71870 stration, Coordination, and S Post 305,000.00 0.00 Canceled 2022-11-14 2022-11-16 2022-11-29 2022-11-22 2022-12-19 2023-02-02 2023-02-17 2023-03-01 2023-03-13 2023-11-08 Based Selection l GESTION DE SAUVEGARDE E afeguards NVIRONNEMENTALE ET SOCI ALE ET DU MECANISME DE G ESTION DES PLAINTES DU PIF 2 CI-FIP2-337888-CS-LCS-KR-2 023 / SELECTION D’UN CABIN Component 5.Project Admini Least Cost Selecti ET D’AUDIT POUR L’EXERCIC IDA / 71870 stration, Coordination, and S Post Open - National 30,000.00 0.00 Under Review 2023-01-25 2023-01-25 2023-02-01 2023-02-21 2023-03-23 2023-03-28 2023-04-05 2023-04-12 2026-04-11 on E 2022/2023 ; 2024 et 2025 afeguards DU PROJET D’INVESTISSEME NT FORESTIER PHASE 2 CI-FIP2-326046-CS-QCBS-KR 22 / SELECTION D’UN CABINE T CHARGE DU RECRUTEMENT POUR LE RECENSEMENT DES Component 1. Support the D Quality And Cost- Open - Internationa CHEFS D’EXPLOITATION, LE L IDA / 71870 evelopment of Participatory Post 3,000,000.00 0.00 Canceled 2022-11-14 2022-11-16 2022-11-29 2022-11-17 2022-12-19 2023-02-02 2023-02-17 2023-03-01 2023-03-13 2024-03-12 Based Selection l EVE DES EXPLOITATIONS AG Forests Management Plans RICOLES ET DES INFRASTRU CTURES DE BASE DANS LES F ORETS CLASSEES DE CATEG ORIE 3 CIBLEES PAR LE PIF 2 CI-FIP2-361492-CS-QCBS-20 23 / SELECTION D’UN CABINE T CHARGE DU RECRUTEMENT POUR LE RECENSEMENT DES Component 1. Support the D Quality And Cost- Open - Internationa CHEFS D’EXPLOITATION, LE L IDA / 71870 evelopment of Participatory Prior 3,000,000.00 0.00 Under Review 2023-05-22 2023-06-14 2023-05-22 2023-06-23 2023-06-11 2023-07-26 2023-08-15 2023-08-25 2023-09-21 2024-09-20 Based Selection l EVE DES EXPLOITATIONS AG Forests Management Plans RICOLES ET DES INFRASTRU CTURES DE BASE DANS LES F ORETS CLASSEES DE CATEG ORIE 3 CIBLEES PAR LE PIF 2 CI-FIP2-361502-CS-QCBS-20 23 / RECRUTEMENT DU BURE AU EN SAUVEGARDE ENVIRO Component 5.Project Admini Quality And Cost- Open - Internationa NNEMENTALE ET SOCIALE PO IDA / 71870 stration, Coordination, and S Prior 3,000,000.00 0.00 Under Review 2023-05-22 2023-06-14 2023-05-22 2023-06-23 2023-06-11 2023-07-26 2023-08-15 2023-08-25 2023-09-21 2026-09-20 Based Selection l UR LE RENFORCEMENT DES afeguards CAPACITES DU PIF 2 ET DU S YSTÈME DE GESTION ENVIRO NNEMENTAL ET SOCIAL DU P ROJET CI-FIP2-327101-CS-QCBS-20 22 / RECRUTEMENT DU BURE AU EN SAUVEGARDE ENVIRO Component 5.Project Admini Quality And Cost- Open - Internationa NNEMENTALE ET SOCIALE PO IDA / 71870 stration, Coordination, and S Post 3,000,000.00 0.00 Canceled 2022-11-24 2022-11-24 2022-12-08 2023-01-26 2023-01-05 2023-02-21 2023-03-23 2023-04-16 2023-05-24 2029-05-22 Based Selection l UR LE RENFORCEMENT DES afeguards CAPACITES DU PIF 2 ET DU S YSTÈME DE GESTION ENVIRO NNEMENTAL ET SOCIAL DU P ROJET CI-FIP2-361874-CS-QCBS-20 23 / SELECTION D'UN CABINE Component 5.Project Admini T DANS LE CADRE D’UNE ASS Quality And Cost- Open - Internationa Under Implement IDA / 71870 stration, Coordination, and S Prior 1,300,000.00 0.00 2023-05-22 2023-06-14 2023-06-07 2023-06-23 2023-07-02 2023-08-16 2023-09-05 2023-09-15 2023-10-12 2026-10-11 ISTANCE TECHNIQUE A LA SO Based Selection l ation afeguards DEFOR POUR LA CONDUITE D E L’AGROFORESTERIE DANS LE CADRE DU PIF-2 CI-FIP2-361970-CS-QCBS-20 23 / RECRUTEMENT D'UN BU Component 5.Project Admini Quality And Cost- Open - Internationa Under Implement REAU DE SUPERVISION POUR IDA / 71870 stration, Coordination, and S Prior 1,000,000.00 0.00 2023-05-22 2023-06-14 2023-06-07 2023-06-23 2023-07-02 2023-08-16 2023-09-05 2023-09-15 2023-10-12 2025-10-11 Based Selection l ation LE PROJET D'INVESTISSEMEN afeguards T FORESTIER PHASE 2 (PIF 2) CI-FIP2-361505-CS-QCBS-20 23 / SELECTION D’UN CABINE T POUR LA CONCEPTION DE L Component 5.Project Admini Quality And Cost- Open - Internationa A PLATEFORME DIGITALE DE IDA / 71870 stration, Coordination, and S Post 480,000.00 0.00 Under Review 2023-05-26 2023-05-26 2023-06-11 2023-07-06 2023-08-20 2023-09-09 2023-09-19 2023-10-16 2025-06-12 Based Selection l GESTION DE SAUVEGARDE E afeguards NVIRONNEMENTALE ET SOCI ALE ET DU MECANISME DE G ESTION DES PLAINTES DU PIF 2 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CI-FIP2-362049-CS-CDS-202 3 / SELECTION DIRECTE AVEC Component 5.Project Admini Pending Impleme LE CABINET KMPG POUR LE IDA / 71870 stration, Coordination, and S Post Direct Selection Direct - National 100,000.00 0.00 2023-05-26 2023-05-31 2023-06-28 2023-07-28 ntation RECRUTEMENT DU PERSONN afeguards EL COMPLEMENTAIRE DU PIF 2 Page 2 Rural & Urban Access Improvement Project (P160359) Procurement Plan Country: Nicaragua Region: LATIN AMERICA AND CARIBBEAN Approval Date: 06-Mar-2017 July 9, 2010 PROCUREMENT Nicaragua : Rural and Urban Access Improvement Project PLAN General Information Country: Nicaragua 2017-08-07 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P160359 GPN Date: 2017-06-19 Project Name: Rural and Urban Access Improvement Project Loan / Credit No: IDA / 59640, IDA / 59630 El Fondo de Mantenimiento Vial (FOMAV) Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NI-FOMAV-23941-CW-RFB / Mantenimiento Periódico del Component 1: Road Infrastru Open - Internationa Single Stage - One E 7,008,524.6 Under Revie 2018-05-3 IDA / 59640 Prior Request for Bids 9,500,000.00 2017-08-11 2017-08-09 2017-08-16 2017-08-14 2017-09-28 2017-09-27 2017-10-27 2017-10-07 2017-12-01 2017-10-25 Tramo de Carretera San Lore cture Improvement l nvelope 8 w 0 nzo - Muhan (30 Km) NI-FOMAV-37269-CW-DIR / M antenimiento Rutinario con C Component 1: Road Infrastru 2020-01-3 ooperativas de Mantenimient IDA / 59630 Post Direct Selection Direct 667,484.81 601,883.13 Signed 2017-12-22 2018-02-08 2017-12-27 2018-02-25 2018-01-31 2018-08-01 cture Improvement 1 o Vial: El Cuá-San José de Bo cay (32.43 Km), El Portillo-El Cuá (11.58 Km) NI-FOMAV-37374-CW-DIR / M antenimiento Rutinario con C ooperativas de Mantenimient Component 1: Road Infrastru 2020-01-3 IDA / 59630 Post Direct Selection Direct 433,163.89 390,684.84 Completed 2017-12-22 2018-02-08 2017-12-27 2018-07-25 2018-01-31 2018-07-31 o Vial: Empalme San Dionisio cture Improvement 1 - San Dionisio (15.5 Km), Esq uipulas - Muy Muy (29.6 Km) NI-FOMAV-37377-CW-DIR / M antenimiento Rutinario con C ooperativas de Mantenimient Component 1: Road Infrastru 2020-01-3 o Vial: Moyogalpa - San José IDA / 59630 Post Direct Selection Direct 532,656.78 480,420.59 Completed 2017-12-22 2018-02-08 2017-12-27 2018-07-25 2018-01-31 2018-07-31 cture Improvement 1 del Sur - Empalme El Quino - Altagracia (25.04 Km), El Qui no - Santa Cruz - Mérida (7.3 6 Km), Santa Cruz - NI-FOMAV-37379-CW-DIR / M antenimiento Rutinario con C ooperativas de Mantenimient Component 1: Road Infrastru 2020-01-3 IDA / 59630 Post Direct Selection Direct 335,597.15 302,686.00 Signed 2017-12-22 2018-02-08 2017-12-27 2018-07-25 2018-01-31 2018-07-31 o Vial: Las Lajitas - Cuapa (21 cture Improvement 1 .17 Km), Emp. Santo Tomás - San Pedro de Lóvago (8.16 K m) NI-FOMAV-37250-CW-DIR / M antenimiento Rutinario con C ooperativas de Mantenimient Component 1: Road Infrastru 2020-01-2 IDA / 59630 Post Direct Selection Direct 400,296.99 361,040.88 Completed 2017-12-15 2018-02-08 2017-12-20 2018-07-25 2018-01-25 2018-08-01 o Vial: La Dalia - La Mora-La cture Improvement 5 Carpa (36.68 Km), El Comeje n - Rancho Grande(4.11 Km) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SDC-01-BM/FOMAV-2020 / IN Component 3: Institutional S Request for Quota Single Stage - One E FRAESTRUCTURA DE RED DE IDA / 59640 trengthening and Implement Post Open - National 27,000.00 23,456.35 Completed 2020-02-05 2020-02-06 2020-03-03 2020-03-04 2020-04-30 2020-05-28 tions nvelope DATOS DEL FOMAV ation Support SDC-02-BM-FOMAV-2020 / C Component 3: Institutional S Request for Quota Single Stage - One E OMPRA DE EQUIPOS DE COM IDA / 59640 trengthening and Implement Post Open - National 29,000.00 23,564.63 Completed 2020-02-12 2020-02-11 2020-03-12 2020-03-18 2020-04-27 2020-03-20 tions nvelope PUTOS ation Support SDC-03-BM-FOMAV-2020 / A Component 3: Institutional S Request for Quota Open - Internationa Single Stage - One E DQUISICIÓN DE LICENCIA DE IDA / 59640 trengthening and Implement Post 23,000.00 20,099.04 Completed 2020-02-26 2020-02-26 2020-03-24 2020-04-02 2020-04-20 2020-05-21 tions l nvelope SOFTWARES ation Support SCD-02-BM-FOMAV-2021 / A Component 3: Institutional S Request for Quota Single Stage - One E DQUISICIÓN DE AIRES DE PR IDA / 59640 trengthening and Implement Post Open - National 27,000.00 30,070.12 Completed 2021-05-19 2021-06-18 2021-09-03 2021-08-20 2022-05-01 tions nvelope ESICIÓN ation Support SDC-03-BM-FOMAV-2021 / A Component 3: Institutional S Request for Quota Single Stage - One E DQUISICIÓN DE CAMARA FOT IDA / 59640 trengthening and Implement Post Open - National 10,500.00 11,438.99 Completed 2021-04-14 2021-03-02 2021-05-14 2021-04-27 2021-06-30 2021-07-07 tions nvelope OGRAFICA Y EDITOR DE VIDE ation Support O Component 3: Institutional S SDC-04-BM-FOMAV-2020 / T Request for Quota Single Stage - One E IDA / 59640 trengthening and Implement Post Open - National 31,000.00 28,861.84 Completed 2020-02-26 2020-02-26 2020-03-27 2020-04-02 2020-05-29 2020-05-20 ELEFONIA INTERNA tions nvelope ation Support NI-FOMAV-199973-GO-DIR / ADQUISICIÓN DE EQUIPAMIE NTO PARA AUSCULTACIÓN VI Component 3: Institutional S AL: SISTEMA DE IMAGEN PAR IDA / 59640 trengthening and Implement Post Direct Selection Direct 195,299.00 195,294.00 Completed 2020-10-15 2020-10-14 2020-11-04 2020-11-11 2020-12-09 2020-12-10 2021-06-07 2021-03-25 A CAMINOS DE TIERRA , RUG ation Support OSÍMETRO , PÉNDULO TRL, SI STEMA PARA OBTENER PARÁ METROS GEOMÉTRICO Y RET ROREFLECTÓMETRO HORIZO NTAL CDC-01-BM-FOMAV-2021 / A DQUISICIÓN DE COMPUTADO Component 3: Institutional S Request for Quota Single Stage - One E RA PORTATIL ROBUSTA, SER IDA / 59640 trengthening and Implement Post Open - National 28,500.00 27,831.84 Completed 2021-02-17 2021-02-22 2021-03-19 2021-04-24 2021-04-30 2021-06-26 tions nvelope VIDOR DE ALMACENAMIENTO ation Support Y FIREWALL SECUNDARIO SDC-04-BM-FOMAV-2021 / A Component 3: Institutional S DQUISICIÓN DE RETROREFLE Request for Quota Open - Internationa Single Stage - One E IDA / 59640 trengthening and Implement Post 16,000.00 16,850.00 Completed 2021-03-20 2021-08-05 2021-05-01 2021-10-20 2021-08-01 2021-12-03 CTOMETRO VERTICAL Y MATI tions l nvelope ation Support LLO PARA MEDIR RESISTENCI A DE CONCRETO NI-FOMAV-275215-GO-RFQ / Component 3: Institutional S Request for Quota Single Stage - One E Adquisición de Equipos Infor IDA / 59630 trengthening and Implement Post Open - National 8,865.00 13,318.44 Completed 2022-02-12 2022-03-03 2022-04-09 2022-05-06 2022-06-08 tions nvelope máticos ation Support Page 1 NI-FOMAV-323249-GO-RFQ / Component 3: Institutional S Request for Quota Single Stage - One E Under Imple Fortalecimiento del Sistema IDA / 59640 trengthening and Implement Post Open - National 11,400.00 0.00 2022-11-19 2022-12-06 2023-01-14 2023-04-14 tions nvelope mentation de Gestión Vial SIGMAVIAL ation Support NI-FOMAV-323255-GO-RFQ / Component 3: Institutional S Adquisición de Solución de A Request for Quota Single Stage - One E IDA / 59640 trengthening and Implement Post Open - National 21,614.00 0.00 Completed 2022-11-22 2022-12-06 2023-01-17 2023-04-17 2023-03-14 utomatización de Respaldo y tions nvelope ation Support Almacenamiento NI-FOMAV-362735-GO-DIR / Component 3: Institutional S Material didactico para Jorna IDA / 59640 trengthening and Implement Post Direct Selection Direct - National 2,900.00 0.00 Completed 2023-05-22 2023-05-24 2023-05-24 2023-05-31 2023-05-31 2023-06-15 2023-06-13 da Tecnica del Fomav ation Support NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CD-07-BM-FOMAV-2020 / CU RSO DE CAPACITACIÓN DE A Component 3: Institutional S SPECTOS INFORMÁTICOS: CU IDA / 59640 trengthening and Implement Post Direct Selection Direct 8,100.00 8,073.47 Completed 2020-10-30 2020-10-14 2020-11-04 2020-11-06 2020-11-13 2020-11-26 2021-06-30 2021-07-21 RSO DE VIRTUALIZACIÓN DE ation Support SERVIDORES Y CURSO DE AD MINISTRACIÓN DE BASE DE D ATOS SQL SERVER CD-13-BM-FOMAV-2020 / Po Component 3: Institutional S stgrado en Gerencia de Proy IDA / 59640 trengthening and Implement Post Direct Selection Direct 25,350.00 21,331.67 Completed 2021-07-21 2021-08-03 2021-07-31 2021-09-22 2021-09-09 2021-10-15 2022-01-07 2022-07-06 ectos en Construcción ation Support NI-FOMAV-362736-GO-DIR / Component 3: Institutional S Under Imple Servicio de Catering para Jor IDA / 59640 trengthening and Implement Post Direct Selection Direct - National 7,200.00 0.00 2023-05-22 2023-05-24 2023-05-24 2023-05-31 2023-05-31 2023-06-15 mentation nada Tecnica del Fomav ation Support CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SDC-06-BM-FOMAV-2020 / A Component 3: Institutional S Quality And Cost- DQUISICIÓN DE SOFTWARE D IDA / 59640 trengthening and Implement Post Open - National 32,000.00 0.00 Canceled 2020-06-15 2020-08-19 2020-06-22 2020-08-20 2020-07-06 2020-07-27 2020-08-04 2020-08-28 2020-09-14 2021-06-30 Based Selection E SEGUIMIENTO Y CONTROL ation Support DE PROCESOS NI-FOMAV-197018-CS-QCBS / CONTRATACION DE FIRMA C ONSULTORA PARA DISEÑO, D Component 3: Institutional S Quality And Cost- Open - Internationa ESARROLLO E IMPLEMENTACI IDA / 59640 trengthening and Implement Post 32,000.00 0.00 Canceled 2020-10-20 2021-02-03 2020-11-04 2021-02-03 2020-12-18 2021-01-15 2021-02-14 2021-03-21 2021-04-25 2022-04-25 Based Selection l ÓN DE UN SISTEMA DE APLIC ation Support ACIÓN PARA SEGUIMIENTO Y CONTROL DE PROCESOS DEL FOMAV INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCC-16-BM-FOMAV-2021 / C Component 3: Institutional S ONSULTOR PARA DESARROLL Individual Consult IDA / 59640 trengthening and Implement Post Open 6,000.00 0.00 Canceled 2021-02-08 2021-02-03 2021-02-26 2021-03-03 2021-03-12 2021-03-31 AR EL TALLER DE GESTIÓN D ant Selection ation Support E ACTIVOS VIALES SCC-11-BM-FOMAV-2020 / C Component 3: Institutional S ONSULTOR PARA DESARROLL Individual Consult IDA / 59640 trengthening and Implement Post Open 6,000.00 4,000.00 Completed 2020-07-31 2020-07-16 2020-08-24 2020-08-24 2020-08-31 2020-09-09 2020-09-11 2020-09-10 2020-09-25 2020-11-21 AR EL TALLER DE MEZCLA AS ant Selection ation Support FALTICA EN FRIO (CASOS PR ÁCTICOS) SCC-14-BM-FOMAV-2021 / C Component 3: Institutional S ONSULTOR PARA DESARROLL Individual Consult IDA / 59640 trengthening and Implement Post Open 7,500.00 7,500.00 Completed 2021-03-08 2021-03-19 2021-03-26 2021-07-09 2021-04-01 2021-07-29 2021-04-12 2021-08-21 2021-04-30 2021-12-07 AR EL TALLER DE ESTABILIZA ant Selection ation Support CIÓN DE TALUDES SCC-15-BM-FOMAV-2021 / C ONSULTOR PARA DESARROLL Component 3: Institutional S Individual Consult AR EL TALLER SOBRE INSPEC IDA / 59640 trengthening and Implement Post Open 6,000.00 6,000.00 Completed 2021-06-07 2021-03-17 2021-06-25 2021-07-09 2021-07-02 2021-07-20 2021-07-15 2021-08-20 2021-07-30 2021-10-12 ant Selection CIÓN Y GESTIÓN DE MANTEN ation Support IMIENTO DE PUENTES SCC-10-BM-FOMAV-2020 / C ONSULTOR PARA DESARROLL Component 3: Institutional S Individual Consult AR TALLER SOBRE TÉCNICA IDA / 59640 trengthening and Implement Post Open 6,000.00 3,206.87 Completed 2020-06-01 2020-07-06 2020-06-19 2020-07-17 2020-06-24 2020-08-21 2020-07-03 2020-08-20 2020-07-13 2020-10-10 ant Selection DE MANTENIMIENTO DE PAVI ation Support MENTOS DE CONCRETO HIDR ÁULICO CD-12-BM-FOMAV-2020 / CO Component 3: Institutional S NSULTOR PARA DESARROLLA IDA / 59640 trengthening and Implement Post Direct Selection Direct 5,000.00 4,659.98 Completed 2020-05-04 2020-06-30 2020-05-09 2020-07-01 2020-06-08 2020-07-23 2020-06-30 2020-08-15 R EL TALLER DE EVALUACIÓN ation Support DE ESTRUCTURA DE PAVIME NTO NI-FOMAV-231996-CS-INDV / Component 3: Institutional S Contratación de Consultor In Individual Consult IDA / 59630 trengthening and Implement Post Open 6,000.00 167.82 Completed 2021-05-10 2021-10-13 2021-05-28 2021-11-10 2021-06-04 2022-01-07 2021-06-17 2022-02-03 2021-07-02 2022-06-01 dividual para Taller de Gestió ant Selection ation Support n de Activos Viales Page 2 PROCUREMENT PLAN (Textual Part) Project information: Uzbekistan - Early Childhood Developement Project - P165737 Project Implementation agency: PIU under the Preschool Education Ministry Procurement Plan: August 23, 2019 Period covered by this Procurement Plan: August, 2019 - December, 2019 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Procurement Law dated April 9, 2018 , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. None. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables. Other Relevant Procurement Information. None. PROCUREMENT Uzbekistan : Promoting Early Childhood Development Project PLAN General Information Country: Uzbekistan 2019-08-28 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P165737 GPN Date: 2020-08-24 Project Name: Promoting Early Childhood Development Project Loan / Credit No: TF / A8999, IDA / 64180 Ministry of pre-school education of the Republic of Uzbekistan Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UZ-MPSE-161638-GO-RFB / 1 .1.5 Providing the MPSE with Printing Equipment to Produc 1 - Improving Quality of Pres Open - Internationa Single Stage - One E IDA / 64180 Prior Request for Bids 1,700,000.00 0.00 Canceled 2020-05-25 2020-05-30 2020-07-14 2020-08-13 2020-09-17 2021-03-16 e Teaching and Learning Mat chool Education l nvelope erials, including service contr act for maintenance of equip ment and supplies UZ-MPSE-161641-GO-RFB / 2 2 - Increasing Access to Qual Open - Internationa Single Stage - One E .1.2 Providing Preschools and IDA / 64180 ity Early Learning Environme Prior Request for Bids 2,400,000.00 0.00 Canceled 2021-01-03 2021-01-08 2021-02-22 2021-03-24 2021-04-28 2021-10-25 l nvelope Education Institutions with IC nts T Equipment RFBG/1/1/20 / 1.1.5 Providin g the MPSE with Printing Equi 1 - Improving Quality of Pres Open - Internationa Single Stage - One E IDA / 64180 Prior Request for Bids 1,700,000.00 0.00 Canceled 2020-06-30 2020-08-17 2020-07-05 2020-08-19 2020-08-16 2020-10-20 2020-09-15 2021-01-13 2020-10-20 2021-04-18 pment to Produce Teaching a chool Education l nvelope nd Learning Materials and rel ated services RFQG/01/2020 / 5.1.4.1 Purc 5 - Supporting Project Mana Request for Quota Single Stage - One E hasing of Equipment for Proje IDA / 64180 Prior Open - National 20,000.00 0.00 Canceled 2020-04-29 2020-06-13 2020-12-10 gement tions nvelope ct Management Team RFQG/5/4/20 / 5.1.4.3 Purch 5 - Supporting Project Mana Request for Quota Open - Internationa Single Stage - One E Pending Impl asing of vehicle for Project M IDA / 64180 Post 20,000.00 0.00 2020-05-23 2020-07-18 2021-01-14 gement tions l nvelope ementation anagement Team RFBG/4/03/20 / 4.2.3.5 Purch 4 - Establishing an Education Open - Internationa Single Stage - One E ase of ICT Equipment for Co IDA / 64180 Quality Measurement Syste Post Request for Bids 240,000.00 222,500.00 Signed 2020-05-31 2020-07-14 2020-06-05 2020-07-14 2020-07-17 2020-08-27 2020-08-16 2020-09-11 2020-09-20 2020-10-24 2020-11-04 l nvelope mputer-based Assessments m RFQG/5/3/20 / 5.1.4.2 Purch 5 - Supporting Project Mana Request for Quota Single Stage - One E Pending Impl asing of Furniture for Project IDA / 64180 Post Open - National 20,000.00 0.00 2020-07-31 2020-08-31 2020-09-30 gement tions nvelope ementation Management Team ECD-RFQG/2/1 / 2.1.3 Providi 2 - Increasing Access to Qual ng Preschools with Nonconta Request for Quota Open - Internationa Single Stage - One E IDA / 64180 ity Early Learning Environme Post 260,000.00 0.00 Canceled 2020-07-10 2020-07-15 2020-07-15 2020-07-30 ct Thermometers to Mitigate tions l nvelope nts the Risk with the Spread of t he COVID-19 ECD-RFBG/4/1 / 4.1.1.1 Provi 4 - Establishing an Education ding the National Center for Open - Internationa Single Stage - One E IDA / 64180 Quality Measurement Syste Post Request for Bids 668,150.00 0.00 Canceled 2020-08-01 2020-08-06 2020-09-17 2020-10-17 2020-11-21 2021-05-20 Quality Education (NCQE) wit l nvelope m h ICT Equipment and Supplie s ECD-RFQG/4/1 / 4.1.1.2 Provi 4 - Establishing an Education Request for Quota Single Stage - One E ding the National Center for IDA / 64180 Quality Measurement Syste Post Open - National 70,850.00 55,429.29 Signed 2020-09-06 2020-10-24 2020-11-01 2020-12-05 2021-04-30 tions nvelope Quality Education (NCQE) wit m h Furniture ECD- RFQG/2/1 / 2.1.3 Provid 2 - Increasing Access to Qual ing Preschools with Nonconta Request for Quota Open - Internationa Single Stage - One E IDA / 64180 ity Early Learning Environme Post 260,000.00 175,000.00 Completed 2020-08-24 2020-10-19 2020-08-18 2021-04-17 2020-09-19 ct Thermometers to Mitigate tions l nvelope nts the Risk with the Spread of t he COVID-19 UZ-MPSE-161641-GO- RFB / 2 - Increasing Access to Qual Open - Internationa Single Stage - One E 2.1.2 Providing Preschools an IDA / 64180 ity Early Learning Environme Prior Request for Bids 2,225,000.00 0.00 Canceled 2020-10-01 2020-10-25 2020-10-31 2020-10-26 2020-12-15 2020-12-14 2021-01-14 2021-03-05 2021-02-07 2021-05-30 l nvelope d Education Institutions with nts ICT Equipment UZ-MPSE-161643-GO-RFB / 2 2 - Increasing Access to Qual .2.3 Equipping Early Learning Open - Internationa Single Stage - One E Pending Impl IDA / 64180 ity Early Learning Environme Post Request for Bids 1,000,000.00 0.00 2021-05-01 2021-05-06 2021-06-20 2021-07-20 2021-08-24 2022-03-22 Hubs with Materials for the I l nvelope ementation nts mplementation of the Alterna tive Models RFBG/1/1/20-1 / 1.1.5 Providi ng the MPSE with Printing Eq 1 - Improving Quality of Pres Open - Internationa Single Stage - One E IDA / 64180 Post Request for Bids 1,700,000.00 1,823,000.00 Signed 2021-04-20 2021-06-21 2021-04-25 2021-06-21 2021-06-14 2021-08-09 2021-07-14 2021-09-06 2021-08-18 2021-09-25 2022-02-14 uipment to Produce Teaching chool Education l nvelope and Learning Materials RFQG/1/2/20 / Activity # 1.1. 1 - Improving Quality of Pres Request for Quota Open - Internationa Single Stage - One E Pending Impl 6 Providing the MPSE with Pu IDA / 64180 Post 500,000.00 0.00 2022-02-19 2022-05-02 2024-12-31 chool Education tions l nvelope ementation blishing Supplies - PIP dated March 3, 2020 RFBG/2/02/20 / 2.1.1 Providi 2 - Increasing Access to Qual ng Preschools with Furniture, Open - Internationa Single Stage - One E IDA / 64180 ity Early Learning Environme Prior Request for Bids 43,200,000.00 33,782,623.37 Signed 2021-04-25 2021-05-17 2021-04-26 2021-05-20 2021-06-15 2021-07-07 2021-07-15 2022-01-27 2021-08-19 2022-01-18 2022-08-19 Equipment and Teaching and l nvelope nts Learning Materials ECD-RFQG/4/2 / 4.2.2.7 Purc 4 - Establishing an Education Request for Quota Open - Internationa Single Stage - One E Under Imple IDA / 64180 Post 80,000.00 0.00 2021-03-06 2021-03-19 2021-05-08 2021-11-04 hasing of minibus for NCQE Quality Measurement Syste tions l nvelope mentation m ECD-RFBG/2/1 / 2.1.2 Providi 2 - Increasing Access to Qual Open - Internationa Single Stage - One E Under Imple ng Preschools and Education IDA / 64180 ity Early Learning Environme Prior Request for Bids 2,400,000.00 0.00 2021-06-30 2021-06-30 2021-07-05 2021-06-30 2021-08-16 2021-08-20 2021-09-15 2021-09-08 2021-10-20 2022-04-18 l nvelope mentation Institutions with ICT Equipme nts nt ECD- RFBG/4/1 / 4.1.1.1 Prov 4 - Establishing an Education iding the State Inspectorate f Open - Internationa Single Stage - One E IDA / 64180 Quality Measurement Syste Post Request for Bids 449,000.00 447,130.03 Signed 2021-12-10 2021-12-09 2021-12-15 2021-12-09 2022-01-26 2022-01-26 2022-02-25 2022-03-01 2022-04-01 2022-08-15 2022-09-28 or Supervision of the Quality l nvelope m of Education (SISQE) with ICT equipment Page 1 ECD-RFQG/4/3 / 4.1.1.3 Provi 4 - Establishing an Education ding the National Center for Request for Quota Single Stage - One E Under Imple IDA / 64180 Quality Measurement Syste Post Open - National 50,000.00 0.00 2022-04-09 2022-04-21 2022-06-04 2022-12-01 Quality Education (NCQE) wit tions nvelope mentation m h photo and video equipment s RFBG/2/02/20/1 / 2.1.1 Procu 2 - Increasing Access to Qual rement, delivery and installat Open - Internationa Single Stage - One E Under Revie IDA / 64180 ity Early Learning Environme Prior Request for Bids 5,700,000.00 0.00 2022-04-04 2022-06-06 2022-04-05 2022-06-16 2022-05-25 2022-07-28 2022-06-24 2022-07-29 2023-07-29 ion of children's tables and c l nvelope w nts hairs for preschools ECD-RFQG/2/2 / Providing Ea 2 - Increasing Access to Qual Request for Quota Single Stage - One E Under Imple IDA / 64180 Post Open - National 20,000.00 0.00 2022-06-18 2022-08-13 2023-02-09 rly Learning Hubs with ICT eq ity Early Learning Environme tions nvelope mentation uipment nts ECD-RFQG/2/3 / Providing Ea 2 - Increasing Access to Qual Request for Quota Single Stage - One E Pending Impl rly Learning Hubs with house IDA / 64180 ity Early Learning Environme Post Open - National 21,500.00 0.00 2022-06-18 2022-08-13 2023-02-09 tions nvelope ementation hold appliances nts ECD-RFQG/2/4 / Providing Ea 2 - Increasing Access to Qual Request for Quota Single Stage - One E Pending Impl IDA / 64180 Post Open - National 25,000.00 0.00 2022-06-18 2022-08-13 2023-02-09 rly Learning Hubs with statio ity Early Learning Environme tions nvelope ementation nery nts ECD-RFQG/2/5 / Providing Ea 2 - Increasing Access to Qual Request for Quota Single Stage - One E Pending Impl IDA / 64180 Post Open - National 92,000.00 0.00 2022-06-18 2022-08-13 2023-02-09 rly Learning Hubs with toys ity Early Learning Environme tions nvelope ementation nts ECD-RFQG/2/6 / Providing Ea 2 - Increasing Access to Qual Request for Quota Single Stage - One E Pending Impl IDA / 64180 Post Open - National 32,000.00 0.00 2022-06-18 2022-08-13 2023-02-09 rly Learning Hubs with printe ity Early Learning Environme tions nvelope ementation d matter nts ECD-RFQG/2/7 / Providing Ea 2 - Increasing Access to Qual Request for Quota Single Stage - One E Pending Impl IDA / 64180 Post Open - National 13,000.00 0.00 2022-06-18 2022-08-13 2023-02-09 rly Learning Hubs with house ity Early Learning Environme tions nvelope ementation wares nts ECD-RFQG/2/8 / Providing Ea 2 - Increasing Access to Qual Request for Quota Single Stage - One E Pending Impl IDA / 64180 Post Open - National 2,500.00 0.00 2022-06-18 2022-08-13 2023-02-09 rly Learning Hubs with sanita ity Early Learning Environme tions nvelope ementation ry ware nts ECD-RFQG/2/9 / Providing Ea 2 - Increasing Access to Qual Request for Quota Single Stage - One E Under Imple IDA / 64180 Post Open - National 10,800.00 0.00 2022-11-18 2023-01-13 2023-01-16 rly Learning Hubs with childr ity Early Learning Environme tions nvelope mentation en's closet nts ECD-RFQG/2/4-2 / 2.2.3.10 P 2 - Increasing Access to Qual Request for Quota Single Stage - One E Under Imple roviding Early Learning Hubs IDA / 64180 ity Early Learning Environme Post Open - National 17,000.00 0.00 2023-06-19 2023-06-22 2023-08-14 2024-02-10 tions nvelope mentation with stationary for 2023 nts ECD-RFQG/2/5-2 / 2.2.3.11 P 2 - Increasing Access to Qual Request for Quota Single Stage - One E Under Imple roviding Early Learning Hubs IDA / 64180 ity Early Learning Environme Post Open - National 52,000.00 0.00 2023-06-19 2023-06-22 2023-08-14 2024-02-10 tions nvelope mentation with toys for 2023 nts ECD-RFQG/2/6-2 / 2.2.3.12 P 2 - Increasing Access to Qual Request for Quota Single Stage - One E Under Imple roviding Early Learning Hubs IDA / 64180 ity Early Learning Environme Post Open - National 22,000.00 0.00 2023-06-19 2023-06-22 2023-08-14 2024-02-10 tions nvelope mentation with printed matter for 2023 nts ECD-RFQG/2/7-2 / 2.2.3.13 P 2 - Increasing Access to Qual Request for Quota Single Stage - One E Under Imple roviding Early Learning Hubs IDA / 64180 ity Early Learning Environme Post Open - National 3,500.00 0.00 2023-06-19 2023-06-22 2023-08-14 2024-02-10 tions nvelope mentation with housewares for 2023 nts NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ECD-RFQNC/4/1 / 4.1.2 Deve 4 - Establishing an Education Request for Quota Single Stage - One E Under Imple lopment and Maintenance of IDA / 64180 Quality Measurement Syste Post Open - National 41,000.00 0.00 2021-03-05 2021-03-30 2021-04-30 2022-04-30 tions nvelope mentation a Website for the NCQE m ECD-RFQNC/1/2 / 1.1.10 Dev 1 - Improving Quality of Pres Request for Quota Single Stage - One E elopment of Videos for Teach IDA / 64180 Post Open - National 38,000.00 0.00 Canceled 2021-04-05 2021-05-31 2021-09-28 chool Education tions nvelope ers and Children for COVID-1 9 Response ECD-RFQNC/1/1 / 1.1.11 Logi 1 - Improving Quality of Pres Request for Quota Open - Internationa Single Stage - One E stical Support to Training Acti IDA / 64180 Post 100,000.00 0.00 Canceled 2021-04-05 2021-05-31 2021-09-28 chool Education tions l nvelope vities for COVID-19 Response ECD-DS/1/1 / 1.1.8 Procurem ent of a License for the non-e xclusive right to exhibit the “ 1 - Improving Quality of Pres Under Imple IDA / 64180 Post Direct Selection Direct 70,000.00 0.00 2021-08-01 2021-08-16 2021-08-06 2021-08-17 2021-09-10 2022-03-09 Sesame Street” Programs for chool Education mentation Children for COVID-19 Respo nse and habits of healthy life, safety and hygiene ECD-RFQNC/2/1 / Providing l ogistical and technical suppo 1 - Improving Quality of Pres Request for Quota Single Stage - One E Under Imple IDA / 64180 Post Limited 50,000.00 0.00 2021-09-20 2021-11-15 2022-05-14 rt for conducting trainings On chool Education tions nvelope mentation Child-centered Approach to T eaching ECD-RFQNC/4/2 / 4.2.3.7 De 4 - Establishing an Education Request for Quota Single Stage - One E Under Imple velopment, Adaptation and T IDA / 64180 Quality Measurement Syste Post Open - National 50,000.00 0.00 2021-11-06 2022-03-10 2022-01-01 2022-06-30 tions nvelope mentation ranslation of Assessments M m aterials ECD-DS/1/2 / 1.1.9 Providing 1 - Improving Quality of Pres related services for COVID-19 IDA / 64180 Post Direct Selection Direct 20,000.00 0.00 Canceled 2021-12-31 2022-01-05 2022-02-09 2022-08-08 chool Education Response and habits of healt hy life ECD- RFQNC/1/1 / 1.1.11 Pro viding logistical and technical 1 - Improving Quality of Pres Request for Quota Single Stage - One E Under Imple support for conducting traini IDA / 64180 Post Limited 50,000.00 0.00 2022-01-22 2022-01-24 2022-03-19 2022-09-15 chool Education tions nvelope mentation ngs On Child-centered Appro ach to Teaching (Module 2) ECD-DS/4/1 / 4.2.2.8 COVID- 4 - Establishing an Education IDA / 64180 Post Direct Selection Direct 45,600.00 0.00 Canceled 2021-12-24 2021-12-29 2022-02-02 2022-08-01 19 learning loss assessment Quality Measurement Syste m ECD - RFQNC/1/2 / 1.1.9 Faci 1 - Improving Quality of Pres Request for Quota Single Stage - One E Under Imple litating the dubbing of Sesam IDA / 64180 Post Open - National 20,000.00 0.00 2022-04-06 2022-04-04 2022-06-01 2022-11-28 chool Education tions nvelope mentation e Workshop video materials ECD-RFQNC/2/2 / 2.2.3.8 Cat 2 - Increasing Access to Qual Request for Quota Single Stage - One E Pending Impl ering services for Early Learn IDA / 64180 ity Early Learning Environme Post Open - National 77,000.00 0.00 2022-07-02 2022-08-27 2023-02-23 tions nvelope ementation ing Hubs (tea,food,fruit,cooki nts es for children) Page 2 ECD-RFQNC/4/3 / 4.2.3.8.1 O 4 - Establishing an Education rganization and conduct of th Request for Quota Single Stage - One E Under Imple IDA / 64180 Quality Measurement Syste Post Open - National 30,000.00 0.00 2022-08-24 2022-08-31 2022-10-19 2022-11-18 e international educational s tions nvelope mentation m ymposium "Evaluation of cha nges in education" ECD-RFQNC/1/3 / 1.2.11 Esta blishment of an Inter-sectoral 1 - Improving Quality of Pres Request for Quota Single Stage - One E Consultative Forum to suppor IDA / 64180 Post Open - National 50,000.00 0.00 Canceled 2020-10-06 2020-12-01 2024-12-31 chool Education tions nvelope t the implementation of Alter native Models for ECD in Uzb ekistan ECD-RFQNC/4/4 / 4.2.3.6 Mai 4 - Establishing an Education Request for Quota Single Stage - One E Pending Impl IDA / 64180 Post Open - National 95,000.00 0.00 2022-11-05 2022-12-31 2024-12-20 ntenance of ICT Equipment Quality Measurement Syste tions nvelope ementation m ECD-RFQNC/5/1 / 5.1.6.1 Сa 5 - Supporting Project Mana Request for Quota Single Stage - One E Under Imple pacity building for communic IDA / 64180 Post Open - National 20,000.00 0.00 2023-05-22 2023-05-22 2023-07-17 2024-07-16 gement tions nvelope mentation ation and coordination of rele vant activities ECD-RFQNC/2/2-2 / 2.2.3.14 2 - Increasing Access to Qual Catering services for Early Le Request for Quota Single Stage - One E Under Imple IDA / 64180 ity Early Learning Environme Post Open - National 74,000.00 0.00 2023-06-23 2023-06-22 2023-08-18 2024-02-14 arning Hubs (tea,food,fruit,co tions nvelope mentation nts okies for children) for 2023 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ECDP/CQS/05 / Support to th 1 - Improving Quality of Pres Consultant Qualifi Open - Internationa e Test of MELQO Tools and R TF / A8999 Post 50,000.00 0.00 Canceled 2019-09-15 2019-10-04 2019-10-10 2019-10-15 2019-10-18 2019-12-17 chool Education cation Selection l elated Training ECDP/CQS/06 / Analysis of C 1 - Improving Quality of Pres Consultant Qualifi onditions for Service Delivery TF / A8999 Post Open - National 5,000.00 0.00 Canceled 2019-10-05 2019-10-24 2019-10-30 2019-11-01 2019-11-07 2019-12-22 chool Education cation Selection by Non-Public Providers ECDP/CQS/09 / Preparation o 3 - Partnering with the Privat Consultant Qualifi Open - Internationa Under Implement TF / A8999 Post 50,000.00 0.00 2019-09-05 2019-09-18 2019-09-24 2019-09-30 2019-09-30 2019-10-08 2019-11-22 f SIB Documents e Sector through a Social Im cation Selection l ation pact Bond ECDP/CQS/10 / Preparation o 3 - Partnering with the Privat Consultant Qualifi Pending Impleme TF / A8999 Post Open - National 55,000.00 0.00 2019-08-20 2019-09-03 2019-09-05 2019-09-06 2019-09-08 2019-12-07 f Feasibility Study e Sector through a Social Im cation Selection ntation pact Bond ECDP/CQS/11 / Training of M 5 - Supporting Project Mana Consultant Qualifi TF / A8999 Post Open - National 13,000.00 0.00 Canceled 2019-09-05 2019-09-24 2019-09-30 2019-10-05 2019-10-08 2019-11-22 PSE Staff for Project Impleme gement cation Selection ntation ECDP/CQS/15 / Customizatio 5 - Supporting Project Mana Consultant Qualifi Under Implement TF / A8999 Post Open - National 11,000.00 0.00 2019-09-05 2019-10-15 2019-09-24 2019-11-08 2019-09-30 2019-10-05 2019-10-08 2019-11-22 n of FM Software gement cation Selection ation 5 - Supporting Project Mana Consultant Qualifi Under Implement ECDP/CQS/16 / Grant Audit TF / A8999 Post Open - National 10,000.00 0.00 2019-09-17 2019-10-21 2019-10-08 2019-11-08 2019-10-29 2019-11-12 2019-11-26 2019-12-26 gement cation Selection ation UZ-MPSE-161691-CS-CQS / 5 5 - Supporting Project Mana Consultant Qualifi Open - Internationa IDA / 64180 Post 135,000.00 53,760.00 Signed 2020-10-05 2020-07-07 2020-10-26 2020-08-12 2020-12-09 2020-09-14 2021-01-08 2020-10-19 2021-02-12 2020-10-21 2021-08-11 .1.7 Supporting Project Finan gement cation Selection l cial Audits CQS/5/2/20 / 5.1.5 customiz 5 - Supporting Project Mana Consultant Qualifi IDA / 64180 Post Open - National 10,000.00 6,082.70 Signed 2020-05-04 2020-06-04 2020-05-18 2020-06-05 2020-06-04 2020-06-27 2020-06-09 2020-07-17 2020-07-01 2020-07-18 2020-12-28 ation of 1C program gement cation Selection ECD-CQS-1 / 3.1.1 Supportin 3 - Partnering with the Privat Consultant Qualifi Open - Internationa IDA / 64180 Prior 250,000.00 220,421.46 Completed 2020-05-10 2020-05-30 2020-05-31 2020-07-05 2020-06-03 2020-07-08 2020-10-25 2020-07-08 2020-11-14 2021-05-04 2022-11-15 g the Development of SIB Do e Sector through a Social Im cation Selection l cuments pact Bond UZ-MPSE-161671-CS-QCBS / 3 - Partnering with the Privat Quality And Cost- Open - Internationa 3.1.1 Supporting the Develop IDA / 64180 e Sector through a Social Im Prior 300,000.00 0.00 Canceled 2020-03-09 2020-03-30 2020-05-13 2020-06-10 2020-07-10 2020-08-14 2020-09-18 2021-09-18 Based Selection l ment of SIB Documents pact Bond LCS/3/01/20 / 3.1.3 Indepen 3 - Partnering with the Privat Least Cost Selecti Open - Internationa Pending Impleme IDA / 64180 Post 900,000.00 0.00 2021-09-30 2021-10-21 2021-12-04 2022-01-01 2022-01-31 2022-03-07 2022-04-11 2022-10-08 dent Verification of SIB Resul e Sector through a Social Im on l ntation ts pact Bond ECD-LCS/4/1 / 4.2.2.4 Devel 4 - Establishing an Education opment and implementation Least Cost Selecti Open - Internationa IDA / 64180 Quality Measurement Syste Post 220,000.00 0.00 Canceled 2021-09-30 2021-10-21 2021-12-04 2022-01-01 2022-01-31 2022-03-07 2022-04-11 2022-10-08 of communication campaigns on l m and public relations ECD-CQS/2/1 / 2.2.2.1 Suppo 2 - Increasing Access to Qual Consultant Qualifi Open - Internationa Under Implement rting the implementation of a IDA / 64180 ity Early Learning Environme Post 100,000.00 0.00 2022-01-31 2022-01-21 2022-02-21 2022-04-07 2022-04-06 2022-05-06 2022-06-10 2022-12-07 cation Selection l ation n ECD Home Visiting Progra nts m ECD-CQS/2/2 / 2.2.2.2 Suppo 2 - Increasing Access to Qual rting the implementation of a Consultant Qualifi Open - Internationa Under Implement IDA / 64180 ity Early Learning Environme Post 100,000.00 0.00 2022-01-31 2022-01-21 2022-02-21 2022-04-07 2022-04-06 2022-05-06 2022-06-10 2022-12-07 Community Based Early Lear cation Selection l ation nts ning Playgroup Program ECD-LCS/4/2 / 4.2.1.3 Data C 4 - Establishing an Education ollection Firm to support the i Least Cost Selecti Open - Internationa IDA / 64180 Quality Measurement Syste Post 450,000.00 0.00 Canceled 2022-02-15 2022-03-08 2022-04-21 2022-05-19 2022-06-18 2022-07-23 2022-08-27 2024-08-16 mplementation of the Measur on l m ement of Early Learning Qual ity Outcomes ECD-QCBS/4/1 / 4.2.1.3 Data Collection Firm to support th 4 - Establishing an Education Quality And Cost- Open - Internationa Under Implement e implementation of the Mea IDA / 64180 Quality Measurement Syste Post 450,000.00 0.00 2022-05-09 2022-06-16 2022-05-30 2022-06-27 2022-07-13 2022-10-26 2022-08-10 2022-11-24 2022-09-09 2022-12-28 2022-10-14 2023-01-26 2022-11-18 2023-11-18 Based Selection l ation surement of Early Learning Q m uality Outcomes (MELQO) in Uzbekistan ECD-CQS/4/1 / 4.2.2.4 Devel 4 - Establishing an Education opment and implementation Consultant Qualifi Open - Internationa Under Implement IDA / 64180 Quality Measurement Syste Post 220,000.00 0.00 2022-05-09 2022-06-15 2022-05-30 2022-06-27 2022-07-13 2022-09-23 2022-08-12 2022-09-16 2023-03-15 of communication campaigns cation Selection l ation m and Public Relations ECD- QCBS/1/1 / 1.1.3 The a ppointment of An ECD Curric 1 - Improving Quality of Pres Quality And Cost- Open - Internationa ulum Specialist to develop an IDA / 64180 Post 387,000.00 0.00 Canceled 2022-09-01 2022-09-22 2022-11-05 2022-12-03 2023-01-02 2023-02-06 2023-03-13 2023-06-11 chool Education Based Selection l In-Service Teacher Training C urriculum and Training Modul es for Uzbekistan ECD-QCBS/1/1 / 1.1.3 Assist ance for Developing New Trai 1 - Improving Quality of Pres Quality And Cost- Open - Internationa IDA / 64180 Post 387,000.00 0.00 Canceled 2020-10-01 2020-10-22 2020-12-05 2021-01-02 2021-02-01 2021-03-08 2021-04-12 2022-10-10 ning Programs for Preschool chool Education Based Selection l Teachers and Teaching and L earning Materials Page 3 UZ-MPSE-161656-CS-QCBS / 1.2.5 Development of a Com munication and Awareness R 1 - Improving Quality of Pres Quality And Cost- Open - Internationa aising Campaigns Plan IDA / 64180 Post 440,000.00 0.00 Canceled 2020-08-25 2020-09-15 2020-10-29 2020-11-26 2020-12-26 2021-01-30 2021-03-06 2022-03-06 chool Education Based Selection l 1.2.6 Implementation of Com munication and Awareness R aising Campaigns ECD-QCBS/2/1 / 2.2.6 Design 2 - Increasing Access to Qual Quality And Cost- Open - Internationa Pending Impleme and implementation of the i IDA / 64180 ity Early Learning Environme Post 400,000.00 0.00 2022-10-31 2022-11-21 2023-01-04 2023-02-01 2023-03-03 2023-04-07 2023-05-12 2024-05-11 Based Selection l ntation mpact evaluation for alternat nts ive models ECD-CQS/1/1 / 1.2.14 Appoin tment for provision translatio 1 - Improving Quality of Pres Consultant Qualifi Under Implement n support the learning mater IDA / 64180 Post Open - National 60,000.00 0.00 2022-12-01 2023-01-10 2022-12-22 2023-01-12 2023-02-04 2023-03-06 2023-04-10 2023-10-07 chool Education cation Selection ation ials, guidelines and training p rograms for preschool learnin g purposes/ environment ECD-CQS/5/1 / 5.1.9 Сonduct 5 - Supporting Project Mana Consultant Qualifi ing an external audit to verif IDA / 64180 Post Open - National 70,000.00 0.00 Canceled 2022-09-01 2022-08-30 2022-09-22 2022-09-07 2022-11-05 2022-12-05 2023-01-09 2024-05-03 gement cation Selection y 3 Project Disbursement Lin ked Indicators ECD - CQS/5/1 / Conducting an external audit to verify 3 1 - Improving Quality of Pres Consultant Qualifi Open - Internationa Under Implement Project Disbursement Linked IDA / 64180 Post 70,000.00 0.00 2023-05-17 2022-08-19 2023-06-07 2023-07-21 2023-08-20 2023-02-23 2023-09-24 2025-01-16 chool Education cation Selection l ation Indicators (DLIs) (variable pa rt grant) financed by the Glo bal Partnership of Education INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ECDP/IC/01 / Building Capaci 1 - Improving Quality of Pres Individual Consult ty in the Utilization of Data fo TF / A8999 Post Open 10,000.00 0.00 Canceled 2019-08-20 2019-11-01 2019-09-02 2019-09-02 2019-09-05 2019-12-31 chool Education ant Selection r Planning and Decision Maki ng ECDP/IC/02 / Adaptation of 1 - Improving Quality of Pres Individual Consult MELQO Instruments TF / A8999 Post Open 80,000.00 19,911.25 Signed 2019-08-20 2019-09-16 2019-09-02 2019-10-12 2019-09-03 2019-10-24 2019-09-05 2019-10-26 2019-12-31 chool Education ant Selection (lead consultant) ECDP/IC/03 / Adaptation of 1 - Improving Quality of Pres Individual Consult MELQO Instruments TF / A8999 Post Open 40,000.00 0.00 Canceled 2019-08-20 2019-09-16 2019-09-02 2019-09-03 2019-09-05 2019-12-31 chool Education ant Selection (junior consultant) ECDP/IC/04 / Translation of 1 - Improving Quality of Pres Individual Consult TF / A8999 Post Open 20,000.00 2.10 Signed 2019-09-20 2019-09-19 2019-10-03 2019-10-15 2019-10-04 2019-10-24 2019-10-06 2019-10-26 2019-12-30 MELQO Instruments chool Education ant Selection ECDP/IC/07 / Preparation of 3 - Partnering with the Privat Individual Consult TF / A8999 Post Open 30,000.00 9,600.00 Signed 2019-08-20 2019-08-23 2019-09-02 2019-10-24 2019-09-03 2019-10-08 2019-09-05 2019-10-09 2019-12-31 Project Operations Manual e Sector through a Social Im ant Selection pact Bond ECDP/IC/08 / Preparation of 3 - Partnering with the Privat Individual Consult TF / A8999 Post Open 40,000.00 18,000.00 Signed 2019-08-20 2019-09-18 2019-09-02 2019-09-30 2019-09-03 2019-10-22 2019-09-05 2019-10-24 2019-12-31 SIB Operations Manual e Sector through a Social Im ant Selection pact Bond ECDP/IC/12 / Hiring of FM Sp 5 - Supporting Project Mana Individual Consult TF / A8999 Post Open 4,000.00 4,000.00 Signed 2019-08-18 2019-08-01 2019-08-27 2019-07-02 2019-08-28 2019-07-10 2019-09-12 2019-07-10 2020-01-10 ecialist gement ant Selection ECDP/IC/13 / Hiring of Procur 5 - Supporting Project Mana Individual Consult TF / A8999 Post Open 4,000.00 4,000.00 Signed 2019-08-18 2019-08-01 2019-08-27 2019-08-01 2019-08-27 2019-08-01 2019-08-27 2019-08-01 2019-12-25 ement Specialist gement ant Selection ECDP/IC/14 / Hiring of Projec 5 - Supporting Project Mana Individual Consult TF / A8999 Post Open 6,000.00 6,000.00 Signed 2019-08-18 2019-08-08 2019-08-26 2019-08-22 2019-08-26 2019-08-23 2019-08-26 2019-08-23 2019-12-24 tr Coordinator gement ant Selection UZ-MPSE-142563-CS-INDV / 5 - Supporting Project Mana Individual Consult IDA / 64180 Post Open 88,500.00 14,400.00 Signed 2019-11-24 2019-11-21 2019-12-14 2019-12-12 2019-12-15 2019-12-12 2019-12-17 2019-12-13 2024-10-21 selection of project coordinat gement ant Selection or UZ-MPSE-142567-CS-INDV / 5 - Supporting Project Mana Individual Consult selection of financial manage IDA / 64180 Post Open 70,800.00 1.30 Signed 2019-11-24 2019-11-21 2019-12-14 2019-12-12 2019-12-15 2019-12-12 2019-12-17 2019-12-13 2024-10-21 gement ant Selection ment specialist UZ-MPSE-143818-CS-INDV / 5 - Supporting Project Mana Individual Consult selection of financial manage IDA / 64180 Post Open 70,800.00 12,000.00 Signed 2019-11-24 2019-11-21 2019-12-14 2019-12-12 2019-12-15 2019-12-12 2019-12-17 2019-12-13 2024-10-21 gement ant Selection ment assistant UZ-MPSE-143819-CS-INDV / 5 - Supporting Project Mana Individual Consult IDA / 64180 Post Open 70,800.00 13,200.00 Signed 2019-11-24 2019-11-21 2019-12-14 2019-12-12 2019-12-15 2019-12-12 2019-12-17 2019-12-13 2024-10-21 selection of procurement spe gement ant Selection cialist UZ-MPSE-143820-CS-INDV / 5 - Supporting Project Mana Individual Consult selection of monitoring and e IDA / 64180 Post Open 70,800.00 13,200.00 Signed 2019-11-24 2019-11-21 2019-12-14 2019-12-12 2019-12-15 2019-12-12 2019-12-17 2019-12-13 2024-10-21 gement ant Selection valuation specialist UZ-MPSE-143821-CS-INDV / 5 - Supporting Project Mana Individual Consult selection of quality measure IDA / 64180 Post Open 64,900.00 13,200.00 Signed 2019-11-24 2019-11-21 2019-12-14 2019-12-12 2019-12-15 2019-12-12 2019-12-17 2020-02-02 2024-10-21 gement ant Selection ment specialist UZ-MPSE-143822-CS-INDV / 5 - Supporting Project Mana Individual Consult IDA / 64180 Post Open 31,900.00 12,000.00 Signed 2019-11-24 2019-11-21 2019-12-14 2019-12-12 2019-12-15 2019-12-12 2019-12-17 2020-02-20 2022-05-05 selection of procurement assi gement ant Selection stant UZ-MPSE-161665-CS-INDV / 1.2.9 Review or Development 1 - Improving Quality of Pres Individual Consult IDA / 64180 Post Open 60,000.00 0.00 Canceled 2020-06-07 2020-07-26 2020-08-16 2020-09-20 2021-03-19 of Regulations on Inclusive Pr chool Education ant Selection eschool Education UZ-MPSE-161690-CS-INDV / 5 - Supporting Project Mana Individual Consult 5.1.2 Assistance from Experi IDA / 64180 Post Open 150,000.00 0.00 Canceled 2020-03-09 2020-03-18 2020-04-27 2020-05-18 2020-06-22 2020-12-19 gement ant Selection enced International Procure ment Specialist IC/5/1/20 / 5.1.2 Assistance f 5 - Supporting Project Mana Individual Consult rom Experienced Internation IDA / 64180 Post Open 100,000.00 100,000.00 Signed 2020-05-04 2020-06-02 2020-06-02 2020-06-20 2020-06-23 2020-06-19 2020-07-28 2020-06-27 2021-01-24 gement ant Selection al Procurement Specialist ECD-IC/1/1 / 1.1.1. Consultin g Services for Assistance on t he Development of a Framew 1 - Improving Quality of Pres Individual Consult IDA / 64180 Post Open 100,000.00 42,480.00 Terminated 2020-06-16 2020-07-17 2020-08-04 2020-08-19 2020-08-25 2020-09-01 2020-09-29 2020-09-06 2021-03-28 ork for Professional Develop chool Education ant Selection ment of Preschool Education Staff Promoting Early Childho od Development Project. Page 4 ECD-IC/2/1 / 2.2.1 Consulting 2 - Increasing Access to Qual Services for Assistance to the Individual Consult IDA / 64180 ity Early Learning Environme Post Open 150,000.00 144,997.00 Signed 2020-06-16 2020-07-17 2020-08-04 2020-08-28 2020-08-25 2020-09-17 2020-09-29 2020-09-22 2021-11-23 Design and Implementation o ant Selection nts f Alternative Models of Servic e Provision ECD-DS/3/1 / 3.1.4 Completi 3 - Partnering with the Privat IDA / 64180 Post Direct Selection Direct 20,000.00 11,000.00 Signed 2020-06-29 2020-07-07 2020-07-09 2020-07-09 2020-09-12 2020-08-07 2020-11-11 on of the SIBOM e Sector through a Social Im pact Bond ECD-IC/1/2 / 1.2.12 Targeted 1 - Improving Quality of Pres Individual Consult Assistance for a More Effectiv IDA / 64180 Post Open 20,000.00 13,200.00 Terminated 2020-08-01 2020-07-17 2020-08-25 2020-10-26 2020-09-04 2020-10-27 2020-09-24 2020-10-29 2021-09-24 chool Education ant Selection e Implementation of the Proj ect Component 1 ECD-IC/3/1 / 3.1.5 Targeted 3 - Partnering with the Privat Individual Consult Under Implement Assistance for a More Effectiv IDA / 64180 e Sector through a Social Im Post Open 20,000.00 0.00 2020-08-01 2020-07-17 2020-08-25 2020-09-04 2020-09-19 2021-09-19 ant Selection ation e Implementation of the Proj pact Bond ect Component 3 ECD-IC/5/1 / 5.1.8 Assistanc 5 - Supporting Project Mana Individual Consult e for Updating the Project Op IDA / 64180 Post Open 20,000.00 5,000.00 Signed 2020-07-09 2020-07-14 2020-08-27 2020-07-23 2020-09-17 2020-07-23 2020-10-22 2020-08-11 2020-12-24 gement ant Selection erations Manual ECD-IC/4/1 / 4.2.1.1 Assistan 4 - Establishing an Education ce for Development and Impl Individual Consult Under Implement IDA / 64180 Quality Measurement Syste Post Open 100,000.00 0.00 2020-07-27 2021-04-29 2020-09-14 2020-10-05 2020-11-09 2022-07-02 ementation of a System to As ant Selection ation m sess the Preschool Education Quality ECD-IC/4/2 / 4.2.1.2 Adaptati 4 - Establishing an Education Individual Consult on of Instruments to Measure IDA / 64180 Quality Measurement Syste Post Open 100,000.00 26,208.00 Completed 2020-09-01 2020-07-24 2020-10-20 2020-09-10 2020-11-10 2020-09-18 2020-12-15 2020-09-22 2021-06-13 2021-03-21 ant Selection Quality and Children Develop m ment ECD-IC/4/4 / 4.2.1.6 Develop 4 - Establishing an Education ment of a Framework and Im Individual Consult IDA / 64180 Quality Measurement Syste Post Open 150,000.00 150,000.00 Signed 2020-08-02 2020-11-06 2020-09-20 2021-01-05 2020-10-11 2021-04-27 2020-11-15 2021-04-28 2023-11-15 plementation Plan for Establi ant Selection m shing a Large-scale National Assessment System ECD-IC/4/5 / 4.2.1.7 Assistan 4 - Establishing an Education ce for the Development of St Individual Consult IDA / 64180 Quality Measurement Syste Post Open 250,000.00 250,000.00 Signed 2020-08-03 2020-11-06 2020-09-21 2021-01-05 2020-10-12 2021-04-27 2020-11-16 2021-04-28 2023-11-16 andardized Items for Nationa ant Selection m l Assessments of Learning Ou tcomes ECD-IC/4/3 / 4.1.3 Strategic Guidance for the Operation o 4 - Establishing an Education Individual Consult f the National Center for Inter IDA / 64180 Quality Measurement Syste Post Open 120,000.00 120,000.00 Signed 2020-08-04 2020-11-06 2020-09-22 2021-01-05 2020-10-13 2021-04-27 2020-11-17 2021-04-28 2023-11-17 ant Selection national Studies on the Asses m sment of Quality of Educatio n ECD-IC/1/3 / 1.1.2 Assistanc 1 - Improving Quality of Pres Individual Consult e for Developing Child-center IDA / 64180 Post Open 100,000.00 97,115.00 Signed 2020-08-31 2020-08-26 2020-10-19 2020-10-16 2020-11-09 2020-10-23 2020-12-14 2020-10-27 2022-04-08 chool Education ant Selection ed Approaches to Teaching ECD-IC/1/4 / 1.2.7 Assistanc e to the Development of Eval 1 - Improving Quality of Pres Individual Consult Under Implement IDA / 64180 Post Open 30,000.00 0.00 2020-08-31 2020-09-30 2020-10-19 2021-01-13 2020-11-09 2020-12-14 2022-04-08 uations, Researches, Studies chool Education ant Selection ation and Surveys on ECD ECD-IC/1/5 / 1.2.1 Developm 1 - Improving Quality of Pres Individual Consult IDA / 64180 Post Open 50,000.00 48,000.00 Signed 2020-08-04 2020-07-31 2020-09-22 2020-10-16 2020-10-13 2020-10-21 2020-11-17 2020-10-24 2021-05-16 ent of a Capacity Enhanceme chool Education ant Selection nt Plan ECD-IC/1/6 / 1.1.8 Developm 1 - Improving Quality of Pres Individual Consult ent of Curriculum Framework IDA / 64180 Post Open 28,000.00 0.00 Canceled 2020-09-10 2020-09-09 2020-10-29 2020-11-19 2020-12-24 2021-04-23 chool Education ant Selection and Related Resources for C OVID-19 Response ECD-IC/1/7 / 1.1.9 Developm 1 - Improving Quality of Pres Individual Consult ent of Training Materials and IDA / 64180 Post Open 24,000.00 0.00 Canceled 2020-09-10 2020-09-09 2020-10-29 2020-11-19 2020-12-24 2021-04-23 chool Education ant Selection Training Activities for COVID- 19 Response ECD-IC/1/8 / 1.1.10 Develop 1 - Improving Quality of Pres Individual Consult ment of Videos for Teachers IDA / 64180 Post Open 38,000.00 0.00 Canceled 2020-09-10 2020-09-10 2020-10-29 2020-11-19 2020-12-24 2021-04-23 chool Education ant Selection and Children for COVID-19 R esponse ECD-IC/1/2-1 / 1.2.12 Target 1 - Improving Quality of Pres Individual Consult Under Implement ed Assistance to Expedite th IDA / 64180 Post Open 20,000.00 0.00 2021-02-15 2021-02-16 2021-03-11 2021-03-21 2021-04-10 2022-04-10 chool Education ant Selection ation e Implementation of Compon ent 1 UZ-MPSE-161666-CS-INDV / 1.2.10 Review or Developme 1 - Improving Quality of Pres Individual Consult Pending Impleme IDA / 64180 Post Open 30,000.00 0.00 2022-03-31 2022-05-19 2022-06-09 2022-07-14 2023-01-10 nt of Regulations on Climate chool Education ant Selection ntation and Seismic Resilience in Pre school Buildings ECD-IC/2/2 / Early Learning 2 - Increasing Access to Qual Individual Consult IDA / 64180 Post Limited 40,000.00 0.00 Canceled 2021-09-15 2021-09-13 2021-09-20 2021-10-11 2021-11-15 2022-05-14 Hub Coordinator in Samarkan ity Early Learning Environme ant Selection d region nts ECD-IC/2/3 / Early Learning 2 - Increasing Access to Qual Individual Consult IDA / 64180 Post Limited 40,000.00 0.00 Canceled 2021-09-15 2021-09-13 2021-09-20 2021-10-11 2021-11-15 2022-05-14 Hub Coordinator in Namanga ity Early Learning Environme ant Selection n region nts ECD-IC/4/6 / 4.2.3.7 Develop 4 - Establishing an Education Individual Consult ment, Adaptation and Transl IDA / 64180 Quality Measurement Syste Post Open 50,000.00 0.00 Canceled 2021-09-30 2021-11-18 2021-12-09 2022-01-13 2022-07-12 ant Selection ation of Assessments Materia m ls ECD-IC/1/9 / 1.2.13 Targeted 1 - Improving Quality of Pres Individual Consult Under Implement Assistance to Expedite the I IDA / 64180 Post Open 20,000.00 0.00 2022-04-01 2022-03-17 2022-04-25 2022-05-05 2022-05-25 2023-05-25 chool Education ant Selection ation mplementation of Componen t 1 (stage 2) ECD- IC/2/2 / 2.2.9 Targeted 2 - Increasing Access to Qual Individual Consult Under Implement Assistance to Expedite the I IDA / 64180 ity Early Learning Environme Post Open 20,000.00 0.00 2022-01-31 2022-01-21 2022-02-24 2022-03-06 2022-03-26 2023-03-26 ant Selection ation mplementation of Componen nts t2 ECD-IC/1/1-2 / 1.1.1/2 Desig n of a Policy Framework to g 1 - Improving Quality of Pres Individual Consult Open - Internationa IDA / 64180 Post 83,260.00 0.00 Signed 2022-08-22 2022-08-19 2022-10-10 2022-09-29 2022-10-31 2022-10-04 2022-12-05 2023-04-04 uide the Professional Develo chool Education ant Selection l pment and Training of the Pr eschool Workforce ECD- IC/1/6 / 1.1.10 Supporti ng the Launch and Take-Up o 1 - Improving Quality of Pres Individual Consult Open - Internationa Under Implement IDA / 64180 Post 100,000.00 0.00 2022-09-01 2022-08-19 2022-10-20 2022-09-29 2022-11-10 2022-10-03 2022-12-15 2023-03-15 f Sesame Street Teaching Re chool Education ant Selection l ation sources by Preschool Teache rs in Uzbekistan ECD- IC/1/7 / 1.2.5 Develop ment of an Early Childhood C 1 - Improving Quality of Pres Individual Consult Open - Internationa Under Implement IDA / 64180 Post 40,000.00 0.00 2022-09-01 2022-12-06 2022-10-20 2022-11-10 2022-12-15 2023-03-25 ommunication and Awarenes chool Education ant Selection l ation s Campaign in Uzbekistan Page 5 ECD-IC/1/10 / 1.2.14 Providin g technical and logistical sup port to the MPSE in preparing 1 - Improving Quality of Pres Individual Consult Open - Internationa Under Implement IDA / 64180 Post 30,000.00 0.00 2022-09-19 2022-09-20 2022-11-07 2022-11-28 2023-01-02 2023-04-02 the UNESCO World Conferenc chool Education ant Selection l ation e on Early Childhood Care an d Education (ECCE) in Uzbeki stan, 14 – 16 November 2022 ECD-IC/1/13 / 1.2.15 Appoint an international ECD consult ant to provide support to the 1 - Improving Quality of Pres Individual Consult Open - Internationa Under Implement MPSE as they prepare to host IDA / 64180 Post 30,000.00 0.00 2022-10-06 2022-10-05 2022-11-24 2022-12-15 2023-01-19 2023-04-19 chool Education ant Selection l ation the UNESCO World Conferenc e on Early Childhood Care an d Education (ECCE) in Uzbeki stan, 14 – 16 November 2022 ECD-IC/1/11 / 1.1.3.1 The ap pointment of An ECD Curricul 1 - Improving Quality of Pres Individual Consult Open - Internationa Under Implement um Specialist to develop an I IDA / 64180 Post 100,000.00 0.00 2022-10-15 2022-10-12 2022-12-03 2023-04-18 2022-12-24 2023-01-28 2023-04-28 chool Education ant Selection l ation n-Service Teacher Training C urriculum and Training Modul es for Uzbekistan ECD-IC/1/12 / 1.1.3.2 Appoin tment of a consultant to Coor 1 - Improving Quality of Pres Individual Consult Under Implement IDA / 64180 Post Open - National 30,000.00 0.00 2022-10-15 2023-04-26 2022-12-03 2022-12-24 2023-01-28 2023-10-25 dinate the scale up of in-serv chool Education ant Selection ation ice teacher training program s in Uzbekistan ECD- IC/1/8 / 1.2.8 Develop ment and implementation of 1 - Improving Quality of Pres Individual Consult Open - Internationa Pending Impleme IDA / 64180 Post 120,000.00 0.00 2022-10-31 2022-12-19 2023-01-09 2023-02-13 2023-10-11 Evaluations, Researches, Stu chool Education ant Selection l ntation dies and Surveys on ECD ECD-IC/1/14 / 1.2.11 Consult ant to support the establishm ent of an Inter-sectoral Cons 1 - Improving Quality of Pres Individual Consult Open - Internationa Under Implement IDA / 64180 Post 50,000.00 0.00 2022-10-31 2022-11-22 2022-12-19 2023-01-09 2023-02-13 2023-10-11 ultative Forum to support the chool Education ant Selection l ation implementation of Alternativ e Models for ECD in Uzbekist an ECD- IC/4/6 / 4.2.1.10 Local Assistant of Lead Consultant 4 - Establishing an Education For Implementation of Tools t Individual Consult Under Implement IDA / 64180 Quality Measurement Syste Post Open - National 46,000.00 0.00 2022-11-14 2022-12-22 2023-01-02 2023-01-23 2023-02-27 2024-12-31 o Measure Preschool Educati ant Selection ation m on Quality and Child Develop ment Outcomes in Uzbekista n Page 6 PROCUREMENT PLAN (Mandatory Requirements) BANGLADESH SCALNG UP RENEWABLE ENERGY PROJECT (P161869) PROJECT IMPLEMENTATION AGENCIES: Electricity Generation Company of Bangladesh (EGCB) Infrastructure Development Company Limited (IDCOL) Sustainable and Renewable Energy Development Authority (SREDA) Period covered by this Procurement Plan: Entire Project Period Preamble In accordance with paragraph 5.9 of the World Bank Procurement Regulations for IPF Borrowers, July 2016 revised November 2017 (“Procurement Regulations”), the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to record all procurement actions for the Project, including preparing, updating and clearing its Procurement Plan, and seeking and receiving the Bank’s review and No-objection to procurement actions as required. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: The Bank’s Standard Procurement Documents (SPDs) shall be used for goods, works and non-consulting services where international competition is required and for all consulting services, including their respective forms of contract. National Procurement Arrangements: In accordance with paragraph 5.3 of the World Bank Procurement Regulations, when approaching the national market, as agreed in the Procurement Plan, the country’s own 1 procurement procedures may be used. These procurement procedures shall be consistent with the Bank’s Core Procurement Principles and ensure that the Bank’s Anti-Corruption Guidelines and Sanctions Framework and contractual remedies set out in its Legal Agreement apply. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement Act 2006 and the Public Procurement Rules 2008, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) Lottery in award of contracts shall not be allowed; 2) Bidders’ qualification[s]/experience requirement[s] shall be mandatory; 3) Bids shall not be rejected based on percentage above or below the estimated cost; 4) Model Bidding Documents agreed with the Bank shall be used for all national open competitive procurement; 5) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations; 6) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. When the Borrower uses other national procurement arrangements (other than national open competitive procurement), such as limited/restricted competitive bidding, request for quotations/shopping, direct contracting), such arrangements shall be consistent with the above requirements. As per paragraph 5.4 of the Procurement Regulations, the “Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework” as attached to this document shall form part of the Model Bidding Documents. Leased Assets: Not Applicable. Procurement of Second Hand Goods: Not Applicable. Domestic preference: as specified under paragraph 5.51 of the Procurement Regulations as follows: 2 Works: Not applicable. Plant/Supply and Installation: Not applicable Hands-on Expanded Implementation Support (HEIS): Not Applicable. Bank’s Procurement Prior Review Thresholds: contracts at or above the thresholds set out in table 1 below are subject to the Bank’s procurement prior review. Table 1: Procurement Prior Review Thresholds (US$ millions) Type of High risk Substantial Moderate Low risk procurement risk risk Works (including 5 10 15 20 turnkey, supply & installation of plant and equipment, and PPP) Goods, information 1.5 2 4 6 technology and non-consulting services 3 Consulting 0.5 1 2 4 services: firms Consulting 0.2 0.3 0.4 0.5 services: Individual Notes: 1. These thresholds apply to all procurement activities regardless of their procurement/selection methods. There is no automatic requirement to undertake prior review for direct selection for value less than these thresholds. Consultant services covers a range of services that are of an advisory or professional nature. 2. In addition to the provisions of Table 1 above, and irrespective of the contract value, the following procurement activities are subject to the Bank’s procurement prior review: (a) procurement processes involving contract negotiations, as described in Section VI, paragraphs 6.34-36, of the Procurement Regulations; (b) competitive dialogue; (c) sustainable procurement; (d) selection of probity assurance providers, as described in Section III, paragraph 3.3 of the Procurement Regulations; and (e) best and final offer. 3. The determination of whether a contract meets the procurement prior review threshold is based on the estimated value of the contract or the package -when the selection document contains more than one lot/slice-, including all taxes and duties payable under the contract. 4 Bid/ Proposal Evaluation Committee: EGCB requires to engage (recruited by EGCB as Consultant) one international technical consultant (solar power plant expert) and one international procurement consultants in their bid/proposal evaluation committee for the procurements of solar power plant and supervision consultant/owner’s engineer. Formation and alteration of the bid/proposal evaluation committee shall be subject to Bank’s no objection. Attachment 1 Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 5 Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. 6 c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub- consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank-financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 7 We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact-finding activities undertaken by the Bank or persons appointed by the Bank to address specific matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. 8 PROCUREMENT Bangladesh : Bangladesh Scaling-up Renewable Energy Project PLAN General Information Country: Bangladesh 2018-12-11 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P161869 GPN Date: 2021-05-26 Project Name: Bangladesh Scaling-up Renewable Energy Project Loan / Credit No: / , TF / A7640 Infrastructure Development Company Limited Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual G-01 UNDER SREP / Commer cial Software for IDCOL Solar TF / A7640 Technical Assistance Post Direct Selection Direct 3,500.00 2,761.23 Completed 2020-11-26 2020-11-23 2020-11-29 2020-11-23 2020-12-02 2020-11-24 2021-12-02 2020-11-24 Rooftop Project G-01 UNDER SREP PROJECTS / Supply, Installation & Config Renewable Energy Financing Request for Quota Single Stage - One E Pending Impl TF / A7640 Post Limited 22,500.00 0.00 2023-05-18 2023-05-31 2024-05-30 uration of Data Logger for Re Facility (REFF) tions nvelope ementation mote Monitoring of IDCOL Sol ar Rooftop Projects. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-01 UNDER SREP / Consulta Renewable Energy Financing Consultant Qualifi nt for developing ESCO mode / Post Open - National 300,000.00 0.00 Canceled 2019-02-03 2019-02-24 2019-03-24 2019-05-05 2019-06-04 2019-09-02 Facility (REFF) cation Selection l and financing instruments f or IDCOL S-02 UNDER SREP / Consulta nt for supporting in Standardi Consultant Qualifi Open - Internationa / Technical Assistance Post 100,000.00 0.00 Canceled 2019-03-03 2019-03-04 2019-06-02 2019-07-22 2019-08-23 2019-11-21 zation of appraisal process, T cation Selection l raining, Development of guid elines etc. S-03/01 UNDER SREP / Selec Quality And Cost- tion of Firm for promoting ID TF / A7640 Technical Assistance Post Open - National 250,000.00 203,368.97 Signed 2019-10-10 2018-12-10 2019-10-31 2022-08-29 2019-12-14 2021-02-22 2020-01-11 2021-04-01 2020-02-10 2021-08-25 2020-03-16 2021-10-05 2020-04-20 2022-01-21 2021-04-20 Based Selection COL Solar Rooftop system S-04 UNDER SREP / Selectio Renewable Energy Financing Consultant Qualifi Open - Internationa Under Implement TF / A7640 Post 400,000.00 0.00 2021-04-15 2021-11-08 2021-06-14 2022-02-02 2021-08-28 2022-04-28 2021-09-27 2021-11-01 2023-10-22 n of Technical Consultant un Facility (REFF) cation Selection l ation der REFF INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual S-03 UNDER SREP / Consulta TF / A7640 Technical Assistance Post Direct Selection Direct 250,000.00 0.00 Canceled 2019-03-03 2019-03-13 2019-05-17 2020-05-16 nt for Promotion and Outreac h Page 1 Sample Procurement Plan (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP) (This is only a sample with the minimum content that is required to be included in the PAD. The detailed procurement plan is still mandatory for disclosure on the Bank’s website in accordance with the guidelines. The initial procurement plan will cover the first 18 months of the project and then updated annually or earlier as necessary). I. General 1. Bank’s approval Date of the procurement Plan [June 19, 2015]: Revision Oct 23, 2017] 2. Date of General Procurement Notice: Oct 18, 2015 3. Period covered by this procurement plan: Oct 2017-Oct 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: [Thresholds for applicable procurement methods (not limited to the list below) will be determined by the Procurement Specialist /Procurement Accredited Staff based on the assessment of the implementing agency’s capacity.] Contracts at or above the threshold set below(USD Million) are subject to the Bank's Prior Review US$Million Works (including turnkey, supply & installation of plant and equipment, and PPP) 2.0 Goods, information technology and non-consulting services 0.5 Oct 31, 2017 Consultants: firms 0.5 Consultants: individuals 0.3 2. 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: [Refer to the relevant CDD project implementation document approved by the Bank or delete if not applicable] 4. Reference to (if any) Project Operational/Procurement Manual: Project Operational Manual that includes a Procurement Section was approved in Sept 17, 2015 5. Any Other Special Procurement Arrangements: [including advance procurement and retroactive financing, if applicable] NONE 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold Oct 31, 2017 1. Competitive Methods (Firms) Above US$ 100,000 2. Single Source (Firms) All 3. Individual Above US$ 50,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule (works, goods, services) Procurement Category: Works 1 2 3 4 5 Proc ID Contract (Description) Estimate Cost Procurement Review by UPDATED STATUS (US$ million) Method Bank PLANNED PREPSamoa/W01 (Negotiations Oct 2.423 NCB Prior Construction of 2015) (Modernization of the National Emergency REVISED Observation 2.423 NCB Prior Operations Center of (20/12/2016) Infrastructure, Data some 1000 sq m (Cost Management Systems, REVISED Table: SC1.1.2.D1) 3.125 NCB Prior Forecasting and (17/06/2017) Warning Systems) ACTUAL 4.870 NCB Prior PREPSamoa/W02 Extension of Seismic PLANNED (Modernization of the Operations Center (at (Negotiations Oct 0.920 Shopping Prior Observation Mulinu'u) (Cost Table: 2015) Infrastructure, Data SC1.1.2.D2) Oct 31, 2017 Management Systems, REVISED Forecasting and 0.820 NCB Post (20/12/2016) Warning Systems) ACTUAL 0.000 NCB Post Procurement Category: Goods 1 2 3 4 5 Proc. ID Contract Estimat Cost Procurement Review by (Description) (US$ million) Method Bank Stockpiling of PREPSamoa/Goods 01 emergency goods to (Enhancement of the enhance preparedness MHEWS Service and and response Preparedness Delivery (Cost Table: System) SC1.1.3.B5) PREPSamoa/Goods 01A Chainsaws (5Nos) PLANNED 5Nos rolls (length: (Negotiations Oct 0.25 Shopping Post 80m per roll) 2015) Nylon/synthetic fibre PREPSamoa/Goods 01B Ropes (18mm diameter and accessories) 5 Nos Water Tanks PREPSamoa/Goods 01C (capacity 10 000litres each) REVISED 0.03 Shopping Post (20/12/2016) PREPSamoa/Goods 01A Chainsaws (5Nos) 0.0085 Shopping Post 5Nos rolls (length: 80m per roll) Nylon/synthetic fibre ACTUAL PREPSamoa/Goods 01B 0.0012 Shopping Post Ropes (18mm diameter and accessories) Oct 31, 2017 5 Nos Water Tanks PREPSamoa/Goods 01C (capacity 10 000litres 0.0097 Shopping Post each) PLANNED Office Equipment ( (Negotiations Oct 3Nos computers, 2 Nos 2015) PREPSamoa/Goods 02 digital camera and1 No REVISED printer/scanner/fax 0.01 Shopping Post (20/12/2016) with accessories) ACTUAL 0.01 Shopping Post PLANNED (Negotiations Oct Office furniture ( office 2015) desks, filing cabinets PREPSamoa/Goods 03 REVISED with locks and office 0.005 Shopping Post chairs) (20/12/2016) ACTUAL 0.005 Shopping Post PLANNED Direct PREPSamoa/Goods 04 GSM connection for 18 (Negotiations Oct 0.450 Prior Contracting (Modernization of the Nos rainfall and 16 Nos 2015) Observation hydrological sub REVISED Direct 0.450 Post Infrastructure, Data stations (20/12/2016) Contracting Management Systems, (Cost Table: Direct Forecasting and SC1.1.2.A1 & ACTUAL 0.247 Post Contracting Warning Systems) SC1.1.2.B1) Direct EXTENSION 0.00 Post Contracting Bid Package (BP2 with Lots for Samoa and PREPSamoaTonga/Goo PLANNED Lots Tonga with ds/BP2 (REGIONAL (Negotiations Oct 1.10 ICB Prior separate contracts) - (PSU) PROCUREMENT) 2015) regional procurement by SPC Oct 31, 2017 Samoa Lot A Data management (Modernization of the Equipment system, Observation including back up at Infrastructure, Data TBA TBA TBA TBA NEOC Management Systems, (Cost Ta ble: Forecasting and SC1.1.2.B2) Warning Systems) Samoa Lot B (Modernization of the Forecasting platform Observation Equipment backup at Infrastructure, Data NEOC TBA TBA TBA TBA Management Systems, (Cost Table: Forecasting and SC1.1.2.B3) Warning Systems) Computers, software for drought and flood monitoring, storm Samoa Lot C surges, coastal (Modernization of the inundation forecasting Observation and hydrological Infrastructure, Data TBA TBA TBA TBA forecasting (3 Management Systems, independent systems), Forecasting and visual tools for MHEWS Warning Systems) at Met Dept (Cost Table: SC1.1.2.C1) Computers, software, Samoa Lot D furniture, generators (Modernization of the for NEOC and Seimic Observation Operations Center Infrastructure, Data (warning TBA TBA TBA TBA Management Systems, dissemination) with Forecasting and back up system at Warning Systems) NEOC (Cost Table: SC1.1.2.C3) ACTUAL TBA TBA TBA Oct 31, 2017 Procurement Category: Consultant 1 2 3 4 5 Proc. ID Description of Estimate Cost Selection Review by Assignment UPDATED STATUS (US$ million) Method Bank PLANNED (Negotiation 0.100 ICS Prior 2015) Institutional strengthening, REVISED development of a legal 0.100 ICS Post PREPSamoa/CON 01 (20/12/2016) and regulatory (Strengthening Early framework for MHEWS Warning and including development Preparedness) of SOPs,etc ACTUAL 0.05 ICS Post (Cost Table: SC1.1.1.A1) EXTENSION 0.00 ICS Post INCL. AS PLANNED DELIVERABLE FOR (Negotiation Oct 0.300 QCBS Prior PREPSamoaTonga/C 2015) INCL. AS DELIVERABLE ON01 SIC Regional Proc. Regional Proc. Regional Proc. FOR REVISED Improvement of PREPSamoaTonga/C PREPSamoaTonga/ PREPSamoaTonga/C PREPSamoaTonga/CON (20/12/2016) service delivery to ON 01 SIC CON 01 SIC ON 01 SIC 01 SIC communities including PREPSamoa/CON 02 development and (Enhancement of the introduction of mobile MHEWS Service and Regional Proc. Regional Proc. Regional Proc. applications (warnings, Preparedness Delivery ACTUAL PREPSamoaTonga/C PREPSamoaTonga/ PREPSamoaTonga/C water and food ON 01 SIC CON 01 SIC ON 01 SIC System) security) (Cost Table: SC1.1.3.A2) Oct 31, 2017 PLANNED (Negotiation Oct 0.100 ICS Post PREPSamoa/CON 03 Survey of warning 2015) (Enhancement of the utility with public and MHEWS Service and other sectors REVISED 0.10 ICS Post Preparedness Delivery (Cost Table: (20/12/2016) System) SC1.1.3.A3) ACTUAL 0.00 ICS Post PLANNED PREPSamoa/CON 04 (Negotiation Oct 0.500 QCBS Prior (Risk Reduction and Feasibility study for 2015) Resilient Investment Investments Phase 2 REVISED Planning and (Cost Table: SC2.1.1) 0.50 QCBS Prior (20/12/2016) Preparation) ACTUAL 0.00 QCBS Prior PLANNED (Negotiation 0.125 ICS Prior PREPSamoa/CON 05 2015) DRF Capacity Building (Disaster risk financing REVISED (Cost Table: SC3.1.3) 0.125 ICS Post instruments) (20/12/2016) ACTUAL ToR2 0.00 ICS Post PLANNED (Negotiation Oct 0.250 ICS Post 2015) PREPSamoa/CON 06 Project Manager REVISED 0.25 ICS Post (Project management) (Cost Table: SC4.1.1) (20/12/2016) ACTUAL 0.105 ICS Post RE-TENDER 0.00 ICS Post PLANNED (Negotiation Oct 0.175 ICS Prior PREPSamoa/CON 07 Procurement Officer 2015) (Project management) (Cost Table: SC4.1.2) REVISED 0.175 ICS Post (20/12/2016) ACTUAL 0.105 ICS Post Oct 31, 2017 PLANNED (Negotiation Oct 0.250 ICS Prior 2015) Implementation REVISED PREPSamoa/CON 08 0.25 ICS Post Support Specialist (20/12/2016) (Project management) (Cost Table: SC4.1.3) ACTUAL 0.073 ICS Post EXTENSION 0.433 ICS Post PLANNED (Negotiation Oct 0.125 ICS Post 2015) PREPSamoa/CON 09 M&E Officer REVISED 0.125 ICS Post (Project management) (Cost Table: SC4.1.4) (20/12/2016) ACTUAL 0.00 ICS Post PLANNED (Negotiation Oct 0.10 CQS Prior 2015) Design and REVISED Supervision and EIA 0.10 CQS Post (20/12/2016) study for the extension PREPSamoa/CON 10 of the Seismic Operations Center at REVISED 0.16 CQS Post Mulinu'u (28/02/2017) ACTUAL 0.00 CQS Post Design and Develop PLANNED Technical (Negotiation Oct 0.02 ICS Post specifications for the 2015) PREPSamoa/CON 11 upgrading of the Microwave links at REVISED 0.02 ICS Post Aleisa, Fagalii and Mt (20/12/2016) Oct 31, 2017 Fiamoe ACTUAL 0.025 ICS Post PLANNED (Negotiation Oct 0.10 CQS Prior Assessment, Design 2015) and Supervision (including EIA) of REVISED 0.10 CQS Post ‘school building’ (20/12/2016) PREPSamoa/CON 12 structures in 3 target communities; REVISED Taelefaga, Uafato in 0.247 CQS Post (20/07/2017) Fagaloa/Upolu and Falealupo in Savaii ACTUAL 0.00 QCBS Post PLANNED PREPSamoa/CON 13 Design and Technical (Negotiation Oct 0.02 ICS Post (Modernization of the specifications for the 2015) Observation seismic station Infrastructure, Data (volcanic monitoring at Management Systems, Savaii, Matavanu) REVISED 0.02 ICS Post Forecasting and (Cost Table SC1.1.2. (20/12/2016) Warning Systems) A2; SC1.1.2.A3) ACTUAL 0.027 ICS Post SYSTEM PREPSamoaTonga/CON INTEGRATOR 01 (REGIONAL (PSU) CONSULTANT PROCUREMENT) (Regional-Tonga + Samoa) PLANNED Detailed Design of the (Negotiation Oct 0.90 QCBS Prior Samoa Lot A MHEWS system, 2015) (Institutional Development, Strengthening, improvement and Capacity Building and operationalization of Implementation production of basic Support) and specialized information products, Oct 31, 2017 Development of SOPs, REVISED (20/12/2016) 1.2 QCBS Prior warning protocols and signals (Cost Table: SC1.1.1.A1; SC1.1.1.B1; SC1.1.1.B2; SC1.1.1.C1; ACTUAL QCBS Prior SC1.1.3.A1; SC1.1.3.A2; SC1.1.3.B1); 1.275 Oct 31, 2017 PROCUREMENT Samoa : PACIFIC RESILIENCE PROJECT UNDER PACIFIC RESILIENCE PROGRAM PLAN General Information Country: Samoa 2017-10-31 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P154839 GPN Date: Project Name: PACIFIC RESILIENCE PROJECT UNDER PACIFIC RESILIENCE PROGRAM Loan / Credit No: IDA / D0770, IDA / D3800 Ministry of Natural Resources and Environment; Disaster Management Office Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned WS-MNRE DMO-33428-CW-R FB / Modernisation of the Obs ervation Infrastructure, Data Component 1: Strengthenin Single Stage - One E 2019-05-2 Management System, Foreca IDA / D0770 g Early Warning and Prepare Prior Request for Bids Open - National 4,870,000.00 0.00 Canceled 2017-10-24 2017-10-29 2017-12-10 2017-08-08 2018-01-09 2018-02-14 2018-03-01 nvelope 5 sting and Warning System / dness Construction of National Eme rgency Operations Center of some 100sq.m WS-MNRE DMO-33428-CW-R Component 1: Strengthenin FB-2 / PREPSamoaW01 / Con Single Stage - One E 2,466,811.0 2019-11-2 IDA / D0770 g Early Warning and Prepare Prior Request for Bids Open - National 3,125,000.00 Signed 2018-03-21 2018-06-17 2018-06-04 2018-08-08 2018-07-23 2018-09-17 2018-08-22 2018-11-27 2018-10-01 2019-02-13 struction of the National Eme nvelope 4 5 dness rgency Operations Center of some 1000 sq meter WS-MNRE DMO-33432-CW-R Component 1: Strengthenin FB / PREPSamoaW02 / Const Single Stage - One E 2021-09-0 IDA / D0770 g Early Warning and Prepare Post Request for Bids Open - National 820,000.00 0.00 Canceled 2020-08-31 2020-10-12 2020-10-15 2020-11-10 2020-12-04 ruction of the Seismic Opera nvelope 4 dness tions Center at Mulinuu WS-MNRE DMO-68707-CW-R FB / PREPSamoaW03 /Constr Component 2: Risk Reductio Single Stage - One E 2021-03-0 IDA / D0770 Post Request for Bids Open - National 350,000.00 0.00 Canceled 2020-04-02 2020-05-15 2020-05-18 2020-07-03 2020-08-03 uction of School Building for n and Resilient Investments nvelope 3 Vaigaga Primary School WS-MNRE DMO-355172-CW- Request for Quota Component 2: Risk Reductio Request for Quota Single Stage - One E Pending Imp 2023-05-1 RFQ / PREPSamoaW04 / Dem IDA / D0770 Post Open - National tions (Non Bank-S 60,000.00 0.00 2023-04-08 2023-05-15 n and Resilient Investments tions nvelope lementation 8 olition of the Old Vaigaga Pri PD) mary School WS-MNRE DMO-338785-CW- Request for Quota RFB / PREPSamoaW03B - Con Component 2: Risk Reductio Request for Quota Single Stage - One E Pending Imp 2024-04-3 IDA / D0770 Post Open - National tions (Non Bank-S 1,000,000.00 0.00 2023-05-07 2023-07-24 struction of the Vaigaga Prim n and Resilient Investments tions nvelope lementation 0 PD) ary School Building WS-MNRE DMO-362382-CW- Request for Quota Component 1: Strengthenin RFQ / PREPSamoaW02C / Co Request for Quota Single Stage - One E tions - Small Work Pending Imp 2024-05-1 IDA / D0770 g Early Warning and Prepare Post Open - National 820,000.00 0.00 2023-08-09 2023-11-13 nstruction of the Seismic Ope tions nvelope s (Emergency) SP lementation 1 dness ration Center (Tuanaimato) D -Competitive GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-36271-GO-R FQ / Modernization of the Ob servation Infrastructure, Data Component 1: Strengthenin Management Systems, Forec Request for Quota Open - Internationa Single Stage - One E Under Imple IDA / D0770 g Early Warning and Prepare Post 3,300.00 0.00 2017-12-16 2018-03-03 2018-05-02 asting and Warning System / tions l nvelope mentation dness Network Server (for Water Re source Division to enable pro per data communication / da ta logger without interferenc e0 WS-MNRE DMO-68714-GO-R FQ / PREPSamoaGoods09A / Component 1: Strengthenin Request for Quota Single Stage - One E Under Imple Increase of Stockpiling of em IDA / D0770 g Early Warning and Prepare Post Open - National 8,500.00 0.00 2018-09-22 2018-11-29 2018-12-27 tions nvelope mentation ergency goods to enhance pr dness eparedness and response / 5 Chainsaws WS-MNRE DMO-68717-GO-R FQ / PREPSamoaGoods09B / I Component 1: Strengthenin ncrease of Stockpiling of eme Request for Quota Single Stage - One E Under Imple IDA / D0770 g Early Warning and Prepare Post Open - National 1,200.00 0.00 2018-09-22 2018-11-29 2018-12-27 rgency goods to enhance pre tions nvelope mentation dness paredness and response / 5 rolls nylon or synthetic fibre r opes WS-MNRE DMO-68718-GO-R FQ / PREPSamoaGoods09C / I Component 1: Strengthenin ncrease stockpiling of emerg Request for Quota Single Stage - One E Under Imple IDA / D0770 g Early Warning and Prepare Post Open - National 10,000.00 0.00 2018-09-22 2018-11-29 2018-12-27 ency goods to enhance prep tions nvelope mentation dness aredness and response / 5 w ater tanks (capacity 10000L each) WS-MNRE DMO-89353-GO-R Component 1: Strengthenin FQ / PREPSamoaGoods09d / I Request for Quota Single Stage - One E Under Imple IDA / D0770 g Early Warning and Prepare Post Open - National 5,700.00 0.00 2018-12-17 2019-03-11 2022-03-10 ncrease of Stockpile Goods / tions nvelope mentation dness Generators (5units) WS-MNRE DMO-89354-GO-R Component 1: Strengthenin Request for Quota Single Stage - One E Under Imple FQ / PREPSamoaGoods9e - In IDA / D0770 g Early Warning and Prepare Post Open - National 4,000.00 0.00 2018-12-17 2019-03-11 2022-03-10 tions nvelope mentation crease of Stockpile Goods - dness Water Pumps WS-MNRE DMO-89356-GO-R Component 1: Strengthenin FQ / PREPSamoaGoods09f - I Request for Quota Single Stage - One E Under Imple IDA / D0770 g Early Warning and Prepare Post Open - National 2,560.00 0.00 2018-12-17 2019-03-11 2022-03-10 ncrease in stockpile goods - tions nvelope mentation dness Brushcutters (5units) WS-MNRE DMO-103711-GO- DIR / PREPSamoaGoods10 / S Component 4: Project and Pr upply of UPS (8 x 1600VAUP IDA / D0770 Post Direct Selection Direct 2,500.00 0.00 Canceled 2019-03-04 2019-03-09 2019-04-13 2019-05-25 ogram Management S Server) for Climate Service and Forecasting Sitement Eq uipment Page 1 WS-MNRE DMO-103711-GO- DIR-2 / PREPSamoaGoods10 / Component 1: Strengthenin Request for Quota Single Stage - One E Pending Impl SUPPLY OF UPS (8 X 1600VA IDA / D0770 g Early Warning and Prepare Post Limited 2,500.00 0.00 2019-06-23 2019-08-18 2020-02-14 tions nvelope ementation UPS SERVER) FOR CLIMATE S dness ERVICE AND FORECASTING S ERVER EQUIPMENT WS-MNRE DMO-122696-GO- DIR / PREPSamoaGoods04A / Component 1: Strengthenin EXTENSION OF TELEMETRY IDA / D0770 g Early Warning and Prepare Post Direct Selection Direct 240,000.00 249,079.94 Signed 2019-11-29 2019-11-22 2020-01-13 2020-02-04 2020-03-05 2020-09-12 2020-07-03 NETWORK UPGRADES AND S dness PARE PARTS FOR HYDROLOG ICAL STATIONS WS-MNRE DMO-68709-GO-R Component 1: Strengthenin FQ / PREPSamoaGoods06 / C Request for Quota Single Stage - One E IDA / D0770 g Early Warning and Prepare Post Open - National 130,000.00 0.00 Canceled 2018-07-14 2018-10-27 2019-04-25 ommunication Infrastructure tions nvelope dness Equipment and Software (FO SS) WS-MNRE DMO-68711-GO-R Component 1: Strengthenin Request for Quota Single Stage - One E FQ / PREPSamoaGoods07 / S IDA / D0770 g Early Warning and Prepare Post Open - National 380,000.00 0.00 Canceled 2018-07-30 2018-11-24 2019-05-23 tions nvelope eismic Upgrade dness WS-MNRE DMO-169731-GO- DIR / PREPSamoaGoods11/ M Component 3: Disaster Risk UN Agencies (Dire IDA / D0770 Post Direct 500,000.00 500,000.00 Signed 2020-04-27 2020-04-27 2020-04-27 2020-04-27 2020-05-01 2020-05-29 2020-10-30 edical equipment, medical co Financing ct) nsumables & personal protec tive equipment WS-MNRE DMO-186172-GO- Component 1: Strengthenin RFQ / PREPSamoaGoods012 / Request for Quota Single Stage - One E IDA / D0770 g Early Warning and Prepare Post Open - National 258,708.00 187,332.46 Signed 2020-08-06 2020-09-17 2020-10-15 2021-04-21 2021-04-13 SUPPLY & INSTALLATION OF tions nvelope dness AUDIO VISUAL EQUIPMENT F OR THE NEOC WS-MNRE DMO-217410-GO- RFB / PREPSamoaGoods13 / Component 1: Strengthenin Open - Internationa Single Stage - One E Under Imple Supply and Installation of ICT IDA / D0770 g Early Warning and Prepare Prior Request for Bids 615,000.00 0.00 2021-02-08 2021-05-02 2021-03-01 2021-06-21 2021-03-29 2021-11-29 2021-04-08 2023-05-21 2021-05-06 2022-03-06 l nvelope mentation Equipment for the National E dness mergency Operation Center ( NEOC) WS-MNRE DMO-281595-GO- Component 1: Strengthenin RFQ / PREPSamoaGoods15 / Request for Quota Single Stage - One E Under Imple IDA / D0770 g Early Warning and Prepare Post Limited 6,000.00 0.00 2022-03-09 2022-03-15 2022-05-11 2022-11-07 Supply and Installation of the tions nvelope mentation dness CCTV for the NEOC WS-MNRE DMO-251569-GO- Component 4: Project and Pr Request for Quota Single Stage - One E Pending Impl RFQ / PREPSamoaGoods14 - IDA / D0770 Post Limited 2,000.00 0.00 2022-03-06 2022-05-01 2022-10-28 ogram Management tions nvelope ementation Office IT Equipment (Laptop) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-76202-NC-DI R / PREPSamoaNCS01 / Pacifi Component 3: Disaster Risk c Catastrophe Risk Insurance IDA / D0770 Prior Direct Selection Direct 500,000.00 0.00 Canceled 2018-08-30 2018-09-04 2018-10-19 2019-10-19 Financing Company - Pacific Island Cou ntries, Parametric Insurance Policy WS-MNRE DMO-89355-NC-DI Component 3: Disaster Risk R / PREPSamoaNCS02 - Para IDA / D3800 Prior Direct Selection Direct 2,500,000.00 1,710,000.00 Signed 2018-12-05 2019-02-20 2018-12-10 2019-02-20 2019-01-12 2018-10-31 2023-10-11 Financing metric-type disaster risk insu rance CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-33427-CS-C Component 1: Strengthenin QS / Design and supervision, Consultant Qualifi Open - Internationa IDA / D0770 g Early Warning and Prepare Post 160,000.00 0.00 Canceled 2017-10-24 2017-11-14 2017-12-28 2018-01-27 2018-03-12 2019-06-05 EIA study for the extension of cation Selection l dness the Seismic Operations Cent er at Mulinuu WS-MNRE DMO-47817-CS-Q CBS / PREPSamoaCON14 / Sy stem Integrator Consultant ( SIC)/ Detailed Design of the Component 1: Strengthenin Quality And Cost- Open - Internationa MHEWS system, Developmen IDA / D0770 g Early Warning and Prepare Prior 1,300,000.00 1,326,615.62 Signed 2018-02-07 2018-02-12 2018-02-22 2018-02-27 2018-03-04 2018-03-30 2018-07-09 2018-05-21 2018-04-19 2020-12-31 Based Selection l t, improvement and operatio dness nalization of production of ba sic and speacialise informatio n products, Development SO Ps , warning protocols and si gnals WS-MNRE DMO-33378-CS-Q CBS / Structural Assessment, design and supervision (inclu Component 2: Risk Reductio Quality And Cost- Open - Internationa IDA / D0770 Post 100,000.00 0.00 Canceled 2017-10-24 2017-10-11 2017-11-14 2018-06-07 2017-12-28 2018-08-23 2018-01-25 2018-02-24 2018-04-09 2018-05-23 2019-08-21 ding EIA) of school building st n and Resilient Investments Based Selection l ructures in 3 target communi ties, Taelefaga, Uafato in Fag aloa, Upolu and Neiafu in Sav aii WS-MNRE DMO-33427-CS-C Component 1: Strengthenin QS-2 / PREPSamoaCON10 / Consultant Qualifi Open - Internationa IDA / D0770 g Early Warning and Prepare Post 160,000.00 0.00 Canceled 2019-06-13 2019-07-10 2019-06-27 2019-08-12 2019-08-26 2019-12-23 2019-09-25 2019-11-15 2020-05-13 Design , Supervision of the S cation Selection l dness eismic Operations Center (S OC). WS-MNRE DMO-78864-CS-Q CBS / PREPSamoaCON12 / St ructural Assessment, Design Component 2: Risk Reductio Quality And Cost- Open - Internationa and Supervision (including EI IDA / D0770 Post 247,000.00 0.00 Canceled 2018-09-20 2017-10-11 2018-09-25 2018-10-05 2018-08-31 2018-10-10 2018-10-01 2018-11-09 2019-02-27 2018-12-14 2019-01-27 2020-04-21 n and Resilient Investments Based Selection l A) of school building structur es in 3 target communities, T aelefaga, Uafato and Neiafu i n SAvaii WS-MNRE DMO-33246-CS-Q CBS / Risk Reduction and Res Component 2: Risk Reductio Quality And Cost- Open - Internationa ilient Investment Planning an IDA / D0770 Prior 500,000.00 0.00 Canceled 2017-10-23 2017-11-13 2017-12-27 2018-01-24 2018-02-23 2018-03-30 2018-05-04 2019-05-04 n and Resilient Investments Based Selection l d Preparation (Feasibility Stu dy for Investments Phase 2) Page 2 WS-MNRE DMO-150065-CS- CQS / PREPSamoaCON12B / Component 2: Risk Reductio Consultant Qualifi Verification of Design and Su IDA / D0770 Post Open - National 40,000.00 0.00 Canceled 2019-12-17 2019-12-19 2020-01-08 2019-12-22 2020-02-05 2020-03-20 2020-03-06 2020-03-29 2021-01-23 n and Resilient Investments cation Selection pervision of the Construction of Vaigaga Primary School WS-MNRE DMO-234485-CS- Component 1: Strengthenin CQS / PREPSamoaCON10B / Consultant Qualifi Open - Internationa Under Implement IDA / D0770 g Early Warning and Prepare Post 160,000.00 0.00 2021-05-21 2021-05-27 2021-06-14 2021-05-27 2021-07-05 2021-12-08 2021-09-03 2021-09-17 2022-10-24 Design and Supervision of th cation Selection l ation dness e Seismic Operations Center (SOC) at Tuanaimato WS-MNRE DMO-284764-CS- CQS / PREPSamoaCON12C / Component 2: Risk Reductio Consultant Qualifi Open - Internationa Under Implement DESIGN AND SUPERVISION O IDA / D0770 Post 302,661.06 0.00 2022-05-10 2022-05-06 2022-06-09 2022-05-16 2022-07-13 2022-09-02 2022-07-15 2023-04-24 2022-08-19 2023-02-15 n and Resilient Investments cation Selection l ation F THE CONSTRUCTION OF TH E VAIGAGA PRIMARY SCHOOL INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual WS-MNRE DMO-33222-CS-IN DV / Enhancement of the MH Component 1: Strengthenin Individual Consult EWS Service & Preparedness IDA / D0770 g Early Warning and Prepare Post Open 100,000.00 31,260.96 Signed 2017-10-23 2017-10-18 2017-12-20 2018-06-14 2018-01-10 2018-08-18 2018-02-14 2018-08-28 2018-12-14 ant Selection delivery system / Warning Su dness rvey with public and other se ctors WS-MNRE DMO-33282-CS-IN Component 4: Project and Pr Individual Consult DV / Project Management / M IDA / D0770 Post Open 125,000.00 73,243.24 Signed 2017-10-23 2017-01-19 2017-12-11 2018-08-29 2018-01-10 2018-09-12 2018-02-23 2018-10-04 2020-08-21 ogram Management ant Selection onitoring and Evaluation Offi cer WS-MNRE DMO-33422-CS-IN DV / Modernisation of the Ob servation Infrastructure, Data Component 1: Strengthenin Management Systems, Forec Individual Consult IDA / D0770 g Early Warning and Prepare Post Open 30,000.00 26,702.13 Signed 2017-10-24 2017-10-30 2017-08-11 2017-11-29 2017-10-03 2018-01-10 2017-11-23 2018-07-09 asting and Warning Systems ant Selection dness (Design and Technical specifi cations for the seismic statio n (volcanic monitoring of Sav aii, Matavanu) WS-MNRE DMO-33434-CS-IN Component 4: Project and Pr Individual Consult DV / Project Management / I IDA / D0770 Post Open 73,000.00 325,180.80 Signed 2017-10-24 2016-05-05 2017-12-12 2016-08-04 2018-01-11 2016-10-03 2018-02-24 2016-10-14 2020-10-21 ogram Management ant Selection mplementation Support Spec ialist WS-MNRE DMO-33442-CS-IN DV / Disaster risk financing in Component 3: Disaster Risk Individual Consult IDA / D0770 Post Open 125,000.00 146,945.55 Completed 2017-10-24 2017-10-24 2017-12-12 2017-12-12 2018-01-11 2018-02-01 2018-02-24 2018-02-19 2020-11-20 2019-08-31 struments / Disaster Risk Fin Financing ant Selection ancing (DRF) Capacity Buildi ng WS-MNRE DMO-36268-CS-IN Component 4: Project and Pr Individual Consult DV / Project Management / P IDA / D0770 Post Open 250,000.00 192,450.00 Signed 2017-11-30 2017-11-23 2018-01-18 2018-08-14 2018-02-17 2018-07-31 2018-04-02 2018-08-06 2020-12-02 ogram Management ant Selection REPSamoaCON06 - Project M anager WS-MNRE DMO-55371-CS-C Component 1: Strengthenin DS / PREPSamoaCON15 / Sup IDA / D0770 g Early Warning and Prepare Post Direct Selection Direct 57,000.00 75,078.08 Signed 2018-04-19 2018-09-05 2018-06-09 2018-11-22 2018-09-07 2019-02-18 2019-11-01 ervision for Construction of N dness EOC WS-MNRE DMO-146406-CS- Component 4: Project and Pr CDS / PREPSamoaCON16 / SA IDA / D0770 Post Direct Selection Direct 20,000.00 45,000.00 Signed 2019-12-05 2019-12-04 2019-12-16 2019-11-20 2020-01-20 2020-03-14 2020-07-17 ogram Management FEGUARD SPECIALIST WS-MNRE DMO-332982-CS-I Component 4: Project and Pr Individual Consult Under Implement NDV / PREPSamoaCON06C - IDA / D0770 Post Open - National 100,000.00 0.00 2022-12-22 2022-12-22 2023-02-04 2023-02-18 2023-02-21 2024-04-30 ogram Management ant Selection ation PREP PROJECT MANAGER WS-MNRE DMO-355176-CS- Component 1: Strengthenin Direct - Internation Under Implement IDA / D0770 Post Direct Selection 55,000.00 0.00 2023-04-07 2023-05-19 2023-04-26 2023-06-14 2024-04-19 CDS / PREPSamoaCON17 - IC g Early Warning and Prepare al ation T Specialist dness WS-MNRE DMO-355183-CS- Component 1: Strengthenin Direct - Internation Pending Impleme CDS / PREPSamoaCON18 - Ca IDA / D0770 g Early Warning and Prepare Post Direct Selection 55,000.00 0.00 2023-04-14 2023-05-03 2023-06-14 2024-01-10 al ntation pacity Building Specialist dness WS-MNRE DMO-355185-CS- Component 1: Strengthenin Direct - Internation Pending Impleme CDS / PREPSamoaCON19 - Se IDA / D0770 g Early Warning and Prepare Post Direct Selection 40,000.00 0.00 2023-04-14 2023-05-03 2023-06-21 2024-01-17 al ntation ismic Specialist dness Page 3 Procurement Plan for P124015 (PFS) I. General 2. Bank’s approval Date of the procurement Plan 3. Date of General Procurement Notice: 4. Period covered by this procurement plan: Year 2017. II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Mandatory threshold to Prior Review Type of Procurement procurement use Thresholds in methods Procurement USD method in USD Works (including ≥ ICB turnkey, supply 5.000.000 All contract with & installation of NCB < 5.000.000 estimated cost plant and Shopping < 200.000 equal or above equipment, and Direct 10 million No threshold PPP) contracting ≥ Goods, ICB 1.000.000 All contract with information NCB < 1.000.000 estimated cost technology and Shopping < 100.000 equal or above 2 non-consulting Direct million services No threshold contracting 2. Prequalification. Not applicable 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Not applicable Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Project P124015 4. Any Other Special Procurement Arrangements: Not applicable June 19, 2017 June 19, 2017 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness: This Project is implementing since 2013. This Procurement plan is only for the current year. 1 2 3 4 5 6 7 Ref. Descripti Estimat Packages Dome Review Comme No. on ed stic by Bank nts Cost Prefe (Prior / US$ rence Post) (yes/ no) Summary There is no contracts to be led under ICB of the ICB Works (Works) Summary There is no contracts to be led under ICB of the ICB Goods (Goods) Summary There is no contracts to be led under NCB of the NCB Works (Works) Summary There is no contracts to be led under NCB of the NCB Goods (Goods) Summary There is no contracts to be led under ICB Non of the ICB consulting (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Mandatory threshold to Prior Review Type of Procurement procurement use Thresholds in methods Procurement USD method in USD QCBS; QBS; FBS; All contract with No threshold Consultants: LCS; SSS estimated cost firms equal or above CQS < 300.000 1million Consultants: Competitive and All contract with No threshold individuals SSS estimated cost June 19, 2017 equal or above 0.3 million 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_200,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: Not applicable 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimat Package Review Comment of ed s by Bank s Assignmen Cost (Prior / t US$ Post) Summary There is no contracts to be led under of number QCBS of contracts that will be let under QCBS Summary 443,47 14 Post of number 0 of contracts that will be let under other methods June 19, 2017 PROCUREMENT Burkina Faso : Social Safety Net Project PLAN General Information Country: Burkina Faso 2017-06-22 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank 2023-05-22 if none) Project ID: P124015 GPN Date: 2020-02-25 Project Name: Social Safety Net Project Loan / Credit No: IDA / 54290, TF / A3975, IDA / 64340, IDA / D4760 Project Coordination Unit of Social Nets Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Comple Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes tion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PFS-17932-GO-RFQ / Con Request for Quota Single Stage - One E sommables informatiques et IDA / 54290 Project management Post Limited 14,000.00 13,323.37 Completed 2017-09-04 2017-09-04 2018-06-20 2017-09-04 2016-06-14 tions nvelope de reprographie BF-PFS-17939-GO-RFQ / Joue Cash transfers and awarenes Request for Quota Single Stage - One E ts pour enfants Groupes d'éd IDA / 54290 s programs for poor and vuln Post Limited 36,000.00 33,927.84 Completed 2017-10-02 2017-10-02 2018-12-28 2017-10-02 2019-06-15 tions nvelope ucation erable households BF-PFS-17929-GO-RFQ / Mobi Request for Quota Single Stage - One E Under Imple liers de bureau pour le perso IDA / 54290 Project management Post Limited 90,000.00 0.00 2017-07-15 2017-07-15 2017-07-15 tions nvelope mentation nnel complémentaire BF-PFS-17928-GO-RFQ / Mat Laying the foundations for a Request for Quota Single Stage - One E IDA / 54290 Post Limited 40,000.00 25,582.09 Signed 2017-05-30 2017-07-03 2017-11-08 2017-07-03 ériel d'inscription des bénéfici basic national safety net syst tions nvelope aires em BF-PFS-17535-GO-RFQ / 200 Request for Quota Single Stage - One E boîtes à image au profit des F IDA / 54290 Project management Post Limited 8,000.00 6,163.54 Signed 2017-10-04 2017-09-20 2017-11-29 2017-11-06 2018-05-28 tions nvelope ACOM et Travailleurs Sociaux BF-PFS-17559-GO-RFQ / Mat Laying the foundations for a ériel d'inscription des bénéfici Request for Quota Single Stage - One E IDA / 54290 basic national safety net syst Post Limited 40,000.00 24,059.89 Completed 2017-06-16 2017-08-26 2017-08-11 2017-11-08 2018-02-07 2017-12-01 aires (imprimantes, cartes de tions nvelope em bénéficiaires....) BF-PFS-17573-GO-RFQ / Cart Cash transfers and awarenes Request for Quota Single Stage - One E es conseils petit forma pour l IDA / 54290 s programs for poor and vuln Post Limited 93,000.00 85,155.85 Completed 2017-10-04 2017-09-05 2017-11-29 2017-12-07 2018-05-28 2018-03-12 tions nvelope es bénéficiaires erable households BF-PFS-30236-GO-RFQ / Mat Laying the foundations for a Request for Quota Single Stage - One E ériel de sonorisation pour les IDA / 54290 basic national safety net syst Post Limited 70,000.00 41,414.91 Completed 2017-10-28 2018-09-03 2017-12-23 2018-12-28 2018-06-21 2019-03-25 tions nvelope mobilisations communautaire em s BF-PFS-41091-GO-RFQ / réali Request for Quota Single Stage - One E sation du câblage réseau et d IDA / 54290 Project management Post Limited 34,000.00 24,816.49 Completed 2018-01-20 2018-04-30 2018-03-17 2018-06-13 2018-09-13 2018-10-01 tions nvelope u contrôle d'accès au siège d u PFS BF-PFS-49339-GO-RFB / Maté Laying the foundations for a Single Stage - One E riel informatique et peri-infor IDA / 54290 basic national safety net syst Post Request for Bids Open - National 110,000.00 87,712.65 Signed 2018-04-09 2018-09-11 2018-04-19 2019-02-19 2018-05-19 2019-03-11 2018-05-26 2019-08-27 2018-06-24 2019-11-29 2018-08-23 nvelope matique au profit du Profit du em Projet BF-PFS-49325-GO-RFQ / Acq Request for Quota Single Stage - One E uisition de plaques et sacs sol IDA / 54290 Project management Post Limited 69,760.00 58,150.06 Completed 2018-04-07 2018-09-03 2018-05-27 2018-12-06 2018-07-26 2019-01-17 tions nvelope aires au profit du projet BF-PFS-49654-GO-RFQ / Conf Request for Quota Single Stage - One E ection de plaques pour les no IDA / 54290 Project management Post Limited 14,000.00 12,255.87 Completed 2018-03-24 2018-12-14 2018-05-13 2019-01-30 2018-06-12 2019-02-25 tions nvelope uvelles communes du projet BF-PFS-17949-GO-RFQ / Outil Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 10,000.00 9,620.52 Signed 2018-04-04 2018-07-11 2018-05-24 2018-10-08 2018-08-22 s de communication au profit tions nvelope du PFS BF-PFS-30891-GO-RFQ / Acq uisition de matériel de protec Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 19,600.00 15,162.22 Completed 2018-04-15 2018-08-07 2018-05-21 2018-10-10 2018-08-19 2018-11-22 tion au profit du personnel de tions nvelope terrain du PFS (CRO et FACO M) BF-PFS-22747-GO-RFQ / 35 k its de dissémination audiovis Laying the foundations for a Request for Quota Single Stage - One E uelle (Projecteurs PICO, encei IDA / 54290 basic national safety net syst Post Limited 50,000.00 41,024.43 Completed 2018-04-07 2018-09-03 2018-05-27 2018-12-06 2018-08-25 2019-06-14 tions nvelope ntes, cartes mémoires et ad em aptateurs) pour la sensibilisat ion FA BF-PFS-57177-GO-RFB / Acqu Laying the foundations for a Single Stage - One E isition de tablettes et de télé IDA / 54290 basic national safety net syst Post Request for Bids Open - National 196,200.00 0.00 Signed 2018-04-16 2018-05-04 2018-04-21 2018-06-02 2018-09-28 2018-06-17 2018-09-28 2018-07-22 2018-10-20 nvelope phone au profit du Projet Filet em s Sociaux BF-PFS-57291-GO-RFQ / Joue Laying the foundations for a ts pour enfants au profit des Request for Quota Single Stage - One E IDA / 54290 basic national safety net syst Post Open - National 36,000.00 33,754.49 Completed 2018-06-23 2018-08-28 2018-12-28 2018-10-27 2019-06-15 mères de l'Est, du Centre-Est tions nvelope em et du Nord (Loroum et Passor é) BF-PFS-68463-GO-RFQ / Acq Cash transfers and awarenes Request for Quota Single Stage - One E uisition de kits complémentai TF / A3975 s programs for poor and vuln Post Limited 12,000.00 10,216.74 Completed 2018-08-11 2018-10-11 2018-10-06 2018-11-09 2018-12-05 2018-12-20 tions nvelope res AVEC erable households BF-PFS-68683-GO-DIR / Acqu isition d'un logiciel de gestion IDA / 54290 Project management Post Direct Selection Direct 94,000.00 78,354.47 Completed 2018-07-16 2018-07-11 2018-07-31 2018-08-08 2018-08-29 2018-12-28 2018-10-28 2019-07-15 comptable et des ressources humaines (TOM2 PRO et TOM -Paie) BF-PFS-53859-GO-DIR / Acqu isition d'un logiciel de gestion IDA / 54290 Project management Prior Direct Selection Direct 140,000.00 0.00 Canceled 2018-03-19 2018-07-11 2018-04-03 2018-05-02 2018-07-01 comptable et des ressources humaines (TOM2 PRO et TOM -Paie) BF-PFS-49385-GO-RFB / Maté Single Stage - One E riel roulant (véhicule et moto IDA / 54290 Project management Post Request for Bids Open - National 315,000.00 0.00 Canceled 2018-03-26 2018-04-05 2018-05-05 2018-05-12 2018-06-10 2018-09-08 nvelope cyclettes) au profit du Projet BF-PFS-83445-GO-RFQ / Réal Request for Quota Single Stage - One E isation de cloison en alu vitre IDA / 54290 Project management Post Limited 20,000.00 17,268.88 Signed 2018-11-06 2018-11-16 2018-12-12 2018-12-12 2019-01-11 tions nvelope des locaux du projet Filets so ciaux Page 1 BF-PFS-83447-GO-RFQ / Four Request for Quota Single Stage - One E niture et pose de rideaux typ IDA / 54290 Project management Post Limited 6,000.00 5,125.34 Completed 2018-12-03 2018-11-16 2019-01-08 2018-12-12 2019-01-23 2019-03-04 tions nvelope e stores au profit du Projet Fil ets Sociaux BF-PFS-57317-GO-RFB / Acqu isition de cartes conseil en pe Laying the foundations for a Single Stage - One E tit format pour les bénéficiair TF / A3975 basic national safety net syst Post Request for Bids Open - National 357,000.00 0.00 Canceled 2018-06-11 2018-06-16 2018-07-28 2018-08-04 2018-09-08 2019-09-08 nvelope es de l'est,du Centre Est et d em u Nord (Loroum et Passoré) BF-PFS-19408-GO-RFQ / Acq Cash transfers and awarenes Request for Quota Single Stage - One E uisition de 120 sacs solaires IDA / 54290 s programs for poor and vuln Post Limited 48,000.00 0.00 Canceled 2017-07-09 2017-09-03 2018-03-02 tions nvelope pour la recharge des tablette erable households s BF-PFS-48964-GO-RFB / Maté Single Stage - One E riels audio visuel et de comm TF / A3975 Project management Post Request for Bids Open - National 131,200.00 0.00 Canceled 2018-03-29 2018-04-13 2018-05-13 2018-05-20 2018-06-18 2018-08-17 nvelope unication au profit du projet BF-PFS-49323-GO-RFQ / Carn Cash transfers and awarenes ets de bénéficiaires du Bouki Request for Quota Single Stage - One E TF / A3975 s programs for poor and vuln Post Limited 32,000.00 0.00 Canceled 2018-03-31 2018-05-20 2019-05-20 emdé, du Sanguié, du Nayala tions nvelope erable households , du Sourou et Bam BF-PFS-119896-GO-RFQ / Ac Request for Quota Single Stage - One E quisition de consommables In IDA / 54290 Project management Post Limited 15,850.00 14,562.38 Signed 2019-09-09 2019-10-08 2019-10-19 2019-10-24 2020-10-18 tions nvelope formatiques BF-PFS-119891-GO-RFQ / Ca Request for Quota Single Stage - One E blâge réseau téléphonique et IDA / 54290 Project management Post Limited 1,850.00 0.00 Signed 2019-09-21 2020-01-27 2019-10-31 2019-11-25 tions nvelope informatique BF-PFS-119892-GO-RFQ / Ins Request for Quota Single Stage - One E tallation de vidéo surveillanc IDA / 54290 Project management Post Limited 15,100.00 0.00 Signed 2019-07-14 2020-03-06 2019-08-23 2019-09-22 tions nvelope e dans les locaux de l'UGP BF-PFS-119772-GO-RFQ / Am Request for Quota Single Stage - One E énagement d'un parking pour IDA / 54290 Project management Post Limited 20,000.00 0.00 Signed 2019-07-24 2019-10-25 2019-09-02 2019-10-02 tions nvelope 21 véhicules BF-PFS-119780-GO-RFB / Acq uisition de jouets pour enfant Cash transfers and awarenes Single Stage - One E s à mettre à la disposition de IDA / 54290 s programs for poor and vuln Post Request for Bids Open - National 104,500.00 0.00 Signed 2019-07-08 2019-10-03 2019-07-22 2023-05-26 2019-09-02 2020-10-03 2019-09-16 2020-10-03 2019-10-21 2020-01-19 nvelope s mères de l'Est, du Centre-E erable households st et du Nord (Loroum et Pass oré) BF-PFS-48967-GO-RFQ / Tabl Request for Quota Single Stage - One E es et bancs au profit des villa TF / A3975 Project management Post Limited 24,060.00 0.00 Canceled 2018-03-11 2018-04-30 2018-06-29 tions nvelope ges du Nord (Loroum et Pass oré) BF-PFS-17931-GO-RFQ / Assu Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 15,000.00 0.00 Canceled 2017-07-15 2017-07-15 2017-07-15 rance pour les locaux du PFS tions nvelope BF-PFS-48663-GO-RFB / mat Laying the foundations for a Single Stage - One E ériel et des logiciels informati IDA / 54290 basic national safety net syst Post Request for Bids Open - National 200,000.00 0.00 Canceled 2018-03-12 2018-03-27 2018-04-26 2018-05-11 2018-06-15 2018-08-14 nvelope ques pour le déploiement du em registre BF-PFS-17936-GO-RFQ / Clim Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 1,500.00 0.00 Canceled 2017-08-15 2017-08-15 2017-08-15 atiseurs entretien et réparati tions nvelope on BF-PFS-120226-GO-RFQ / Fo Cash transfers and awarenes urnitures de bureau et divers Request for Quota Single Stage - One E TF / A3975 s programs for poor and vuln Post Open - National 58,000.00 29,564.79 Signed 2019-04-24 2019-07-03 2019-10-08 2019-07-09 équipements pour la formatio tions nvelope erable households n des bénéficiaires en ACV et GERME BF-PFS-140264-GO-RFQ / Ac quisition de fourniture de bur Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 40,000.00 0.00 Signed 2019-11-04 2019-02-06 2019-12-26 2019-12-30 eau et de produits d'entretien tions nvelope pour l'UGP, les CRO et les FA COM BF-PFS-48979-GO-RFB / mat Single Stage - One E ériels de couchage au profit d TF / A3975 Project management Post Request for Bids Open - National 306,000.00 0.00 Canceled 2018-03-26 2018-04-10 2018-05-10 2018-05-25 2018-06-23 2019-06-23 nvelope es groupes d'éducation BF-PFS-57288-GO-RFB / Acqu isition de fourniture de burea Single Stage - One E IDA / 54290 Project management Post Request for Bids Open - National 40,000.00 0.00 Canceled 2018-06-04 2018-06-09 2018-07-21 2018-07-28 2018-09-01 2019-09-01 u et de produits d'entretien p nvelope our l'UGP, les CRO et les FAC OM BF-PFS-17937-GO-RFQ / Assu Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 40,000.00 0.00 Canceled 2017-07-16 2017-07-16 2017-07-16 rance pour véhicules et moto tions nvelope s BF-PFS-119667-GO-RFQ / Ac Cash transfers and awarenes quisition de rubans pour les v Request for Quota Single Stage - One E IDA / 54290 s programs for poor and vuln Post Limited 4,400.00 0.00 Canceled 2019-07-07 2019-08-11 2019-08-26 isionnages 2 et 3 pendant AC tions nvelope erable households V et GERME (1 ruban par gro upe) BF-PFS-88892-GO-RFQ / Acq Request for Quota Single Stage - One E uisition de matériel roulant (v IDA / 54290 Project management Post Open - National 45,000.00 0.00 Canceled 2018-12-15 2019-02-14 2019-04-15 tions nvelope éhicule) au profit du projet fil ets sociaux BF-PFS-119675-GO-RFQ / Ac Request for Quota Single Stage - One E quisition de matériel roulant ( IDA / 54290 Project management Post Open - National 95,000.00 0.00 Canceled 2019-09-15 2019-12-01 2020-02-29 tions nvelope vehicule 4X4 pick up et berlin e) BF-PFS-154432-GO-RFQ / Ins tallation d'un système de géo Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 10,000.00 0.00 Signed 2020-02-01 2020-12-17 2020-03-19 2020-04-18 localisation (GPS) sur les véhi tions nvelope cules du projets BF-PFS-140259-GO-RFQ / Mo Request for Quota Single Stage - One E biliers de bureau pour le pers IDA / 54290 Project management Post Limited 90,000.00 0.00 Signed 2020-02-15 2020-06-15 2020-03-29 2020-05-28 tions nvelope onnel complémentaire du PFS BF-PFS-159686-GO-RFB / Acq Cash transfers and awarenes uisition de materiels et fourni Single Stage - One E Pending Impl IDA / 64340 s programs for poor and vuln Post Request for Bids Open - National 433,814.00 0.00 2020-03-27 2020-04-01 2020-05-13 2020-06-12 2020-07-17 2020-09-15 tures spécifiques pour la mis nvelope ementation erable households e en œuvre de l'école par la r adio BF-PFS-159682-GO-RFQ / Pro duction de carnets pour les b Cash transfers and awarenes énéficiares des régions de la Request for Quota Single Stage - One E IDA / 54290 s programs for poor and vuln Post Limited 49,000.00 0.00 Signed 2020-07-11 2021-05-21 2020-09-05 2020-10-20 Boucle du Mouhoun et du Ce tions nvelope erable households ntre (39 000 carnets pour la Boucle du Mouhoun, 10 000 carnets pour le Centre) BF-PFS-159664-GO-RFQ / Ac quisition de matériel spécifiq Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 4,100.00 0.00 Signed 2020-02-29 2020-03-20 2020-04-03 2020-04-18 ue au profit du spécialiste en tions nvelope sauvegarde environnemental e Page 2 BF-PFS-159685-GO-RFQ / Ac Request for Quota Single Stage - One E quisition de matériel informat IDA / 54290 Project management Post Limited 30,740.00 0.00 Signed 2020-03-28 2020-07-01 2020-05-23 2020-07-07 tions nvelope ique et de logiciel BF-PFS-140260-GO-RFQ / Ac Request for Quota Single Stage - One E quisition de matériel roulant IDA / 54290 Project management Post Limited 90,000.00 0.00 Signed 2020-03-07 2020-04-06 2020-04-28 2020-06-27 tions nvelope au profit du projet filets socia ux BF-PFS-165586-GO-RFQ / Ins Request for Quota Single Stage - One E tallation d'un système de vid IDA / 54290 Project management Post Limited 9,000.00 0.00 Signed 2020-03-18 2020-03-18 2020-03-20 2020-03-22 tions nvelope éo conférence au profit du PF S BF-PFS-171204-GO-RFQ / Ins tallation d'un système de vid Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 9,000.00 0.00 Signed 2020-04-22 2020-06-08 2020-05-14 2020-05-29 éo conférence au Cabinet de tions nvelope la Ministre / MFSNFAH BF-PFS-231183-GO-RFQ / Re crutement d'un prestataire p Cash transfers and awarenes our la production des carnets Request for Quota Single Stage - One E IDA / 64340 s programs for poor and vuln Post Limited 67,000.00 53,366.45 Signed 2021-04-28 2021-05-07 2021-06-23 2021-06-01 2021-12-20 des bénéficiaires dans les rég tions nvelope erable households ions du Nord, Centre-nord et de la Boucle du Mouhoun au profit du projet Filets sociaux BF-PFS-236705-GO-RFQ / Re crutement d’une firme pour l Request for Quota Single Stage - One E IDA / 64340 Project management Post Limited 100,000.00 0.00 Signed 2021-06-02 2021-06-09 2021-07-28 2022-01-24 es travaux d’imprimerie au pr tions nvelope ofit du Projet Filets Sociaux BF-PFS-241486-GO-RFQ / Ac quisition de matériel informat Request for Quota Single Stage - One E IDA / 64340 Project management Post Limited 50,000.00 39,987.82 Signed 2021-07-10 2021-12-15 2021-09-04 2022-01-20 2022-03-03 ique et péri-informatique au tions nvelope profit du Projet Filets Sociaux BF-PFS-241487-GO-RFQ / Ac quisition de matériels, logiciel Request for Quota Single Stage - One E IDA / 64340 Project management Post Limited 31,000.00 24,001.75 Signed 2021-07-10 2021-12-15 2021-09-04 2022-01-20 2022-03-03 s et consommables informati tions nvelope ques au profit du Projet Filets Sociaux BF-PFS-241488-GO-RFQ / Ac Request for Quota Single Stage - One E quisition de matériel de vidéo IDA / 64340 Project management Post Limited 16,000.00 12,713.84 Signed 2021-07-13 2021-11-19 2021-09-07 2021-11-30 2022-03-06 tions nvelope conférence au profit du Projet Filets Sociaux BF-PFS-241490-GO-RFQ / Ac quisition et installation d’une solution de Call Center coupl Cash transfers and awarenes Request for Quota Single Stage - One E ée à une plateforme de traite IDA / 64340 s programs for poor and vuln Post Limited 32,000.00 0.00 Signed 2021-07-14 2021-07-22 2021-09-08 2021-08-05 2022-03-07 tions nvelope ment des plaintes et enregist erable households rement des communication h ébergée au niveau du Centre d’appel du Projet Filets Socia ux BF-PFS-264484-GO-DIR / Acq uisition du carburant au profit IDA / 64340 Project management Post Direct Selection Direct 30,000.00 0.00 Signed 2021-11-30 2021-10-28 2021-12-05 2021-11-04 2022-01-09 2021-11-30 2022-07-08 du parc automobile de l'unité de gestion du Projet filets file ts sociaux BF-PFS-280326-GO-RFQ / PR Cash transfers and awarenes ODUCTION DES CARNETS DE Request for Quota Single Stage - One E IDA / 64340 s programs for poor and vuln Post Limited 49,051.00 0.00 Signed 2022-03-05 2022-02-21 2022-04-30 2022-10-27 BENEFICIAIRES DE LA BOUCL tions nvelope erable households E DU MOUHOUN, DU CENTRE ET DU SAHEL BF-PFS-293364-GO-RFQ / Ac Laying the foundations for a quisition de kits par Associati Request for Quota Single Stage - One E IDA / 64340 basic national safety net syst Post Limited 18,480.00 0.00 Signed 2022-05-21 2021-05-21 2022-07-16 2023-01-12 ons villageoises d’épargne et tions nvelope em de crédit (AVEC) au profit du Projet Filets Sociaux BF-PFS-293366-GO-RFQ / Ac quisition de téléphones (flott Request for Quota Single Stage - One E Pending Impl IDA / 64340 Project management Post Limited 7,000.00 0.00 2022-05-29 2022-07-24 2023-01-20 es) au profit de l'unité de ges tions nvelope ementation tion du projet filets sociaux BF-PFS-302220-GO-RFQ / Ma Laying the foundations for a tériels roulants (Station wago Request for Quota Single Stage - One E IDA / 64340 basic national safety net syst Post Limited 85,000.00 0.00 Canceled 2022-07-16 2022-09-10 2023-03-09 n et berline) au profit du Secr tions nvelope em étariat technique du Registre Social Unique. BF-PFS-302227-GO-RFQ / Ac quisition de matériels informa Laying the foundations for a Request for Quota Single Stage - One E tiques et péri-informatiques a IDA / 64340 basic national safety net syst Post Limited 99,000.00 0.00 Signed 2022-07-17 2022-09-22 2022-09-11 2023-03-10 tions nvelope u profit du Secrétariat techni em que du Registre Social Uniqu e. BF-PFS-302229-GO-RFQ / Ac Laying the foundations for a quisition de matériels et mobi Request for Quota Single Stage - One E IDA / 64340 basic national safety net syst Post Limited 37,000.00 0.00 Signed 2022-07-18 2022-09-16 2022-09-12 2023-03-11 liers de bureau au profit du S tions nvelope em ecrétariat technique du Regis tre Social Unique BF-PFS-302234-GO-RFQ / Ac Laying the foundations for a quisition de Matériels électro Request for Quota Single Stage - One E IDA / 64340 basic national safety net syst Post Limited 6,000.00 0.00 Signed 2022-07-19 2022-10-13 2022-09-13 2023-03-12 ménagers au profit du Secrét tions nvelope em ariat technique du Registre S ocial Unique BF-PFS-302245-GO-RFQ / Ac quisition de consommables et Laying the foundations for a Request for Quota Single Stage - One E fournitures de bureau au prof IDA / 64340 basic national safety net syst Post Limited 9,000.00 0.00 Completed 2022-07-20 2022-09-13 2022-09-14 2023-03-13 2022-10-22 tions nvelope it du Secrétariat technique du em Registre Social Unique BF-PFS-302251-GO-RFQ / Ac Laying the foundations for a quisition de Produits d’entreti Request for Quota Single Stage - One E IDA / 64340 basic national safety net syst Post Limited 5,000.00 0.00 Completed 2022-07-22 2022-10-19 2022-09-16 2023-03-15 2022-10-27 en et de nettoyage au profit tions nvelope em du Secrétariat technique du R egistre Social Unique. BF-PFS-303524-GO-RFQ / Ac quisition de Matériels roulant Laying the foundations for a s (01 Station wagon et 01 Pic Request for Quota Single Stage - One E IDA / 64340 basic national safety net syst Post Limited 160,000.00 0.00 Signed 2022-07-23 2022-09-23 2022-09-17 2023-03-16 k up double cabine) au profit tions nvelope em du Secrétariat technique du r egistre social unique (ST RSU ) BF-PFS-316329-GO-RFQ / Ac Laying the foundations for a quisition de matériel de cuisi Request for Quota Single Stage - One E IDA / 64340 basic national safety net syst Post Limited 17,260.00 0.00 Signed 2022-10-13 2022-11-15 2022-11-10 2022-12-10 ne au profit du Projet Filets S tions nvelope em ociaux pour les Crèches Mobil es/Haltes Garderies BF-PFS-319429-GO-RFQ / Ac quisition de jeux et matériels Laying the foundations for a Request for Quota Single Stage - One E didactiques au profit du Proje IDA / 64340 basic national safety net syst Post Limited 95,440.00 0.00 Signed 2022-10-08 2022-11-21 2022-11-05 2023-01-04 tions nvelope t Filets Sociaux pour les Crèc em hes Mobiles/Haltes Garderies Page 3 BF-PFS-319431-GO-RFQ / Ac quisition de mobilier, de maté Laying the foundations for a Request for Quota Single Stage - One E riel d'hygiène et de sécurité a IDA / 64340 basic national safety net syst Post Limited 80,340.00 0.00 Signed 2022-10-08 2022-11-18 2022-11-05 2023-01-04 tions nvelope u profit du Projet Filets Socia em ux pour les Crèches Mobiles/ Haltes Garderies BF-PFS-355213-GO-RFQ / Ac quisition de matériels et de lo Request for Quota Single Stage - One E Pending Impl giciels informatiques au profi IDA / 54290 Project management Post Limited 96,580.00 0.00 2023-04-10 2023-05-20 2023-06-19 tions nvelope ementation t de l'unité de gestion du proj et filets sociaux et au profit d u SE-CNSA (02 LOTS) BF-PFS-355215-GO-RFQ / Ac quisition de fournitures de bu Request for Quota Single Stage - One E Pending Impl IDA / 54290 Project management Post Limited 80,000.00 0.00 2023-05-06 2023-06-27 2024-04-12 reau et produit d'entretiens a tions nvelope ementation u profit du projet filets sociau x BF-PFS-293365-GO-RFQ / Ac quisition de licences/ logiciels (Systèmes d'exploitation, plat Request for Quota Single Stage - One E Pending Impl IDA / 64340 Project management Post Limited 21,380.00 0.00 2023-04-15 2023-06-10 2023-07-10 eforme de développement, a tions nvelope ementation nti-virus, logiciels de scryptag e, logiciel de de planification de projet)/ST RSU BF-PFS-355217-GO-RFQ / Ac Request for Quota Single Stage - One E Pending Impl quisition de matériels informa IDA / 54290 Project management Post Limited 53,650.00 0.00 2023-05-06 2023-07-01 2023-08-30 tions nvelope ementation tiques pour l'équipe SIG-RSU BF-PFS-355221-GO-RFQ / Ac Request for Quota Single Stage - One E Pending Impl quisition d'un véhicule Pick u IDA / 54290 Project management Post Limited 75,000.00 0.00 2023-05-04 2023-06-25 2023-08-24 tions nvelope ementation p double cabine au profit du ST-RSU BF-PFS-355224-GO-RFQ / Ac Laying the foundations for a quisition de matériels informa Request for Quota Single Stage - One E Pending Impl IDA / 64340 basic national safety net syst Post Limited 55,014.00 0.00 2023-05-02 2023-06-27 2023-08-26 tiques et péri-informatiques a tions nvelope ementation em u profit du ST-RSU BF-PFS-355225-GO-RFQ / Ac Laying the foundations for a Request for Quota Single Stage - One E quisition de matériels et mobi IDA / 64340 basic national safety net syst Post Limited 15,250.00 0.00 Signed 2023-05-14 2022-09-28 2023-07-09 2024-01-05 tions nvelope liers de bureau au profit du S em T-RSU BF-PFS-355226-GO-RFQ / Ac quisition de consommables, d Laying the foundations for a Request for Quota Single Stage - One E Pending Impl e fournitures et matériel élect IDA / 64340 basic national safety net syst Post Limited 5,540.00 0.00 2023-05-14 2023-07-09 2023-07-24 tions nvelope ementation romenagers de bureau au pro em fit du ST-RSU (02 Lots) BF-PFS-355231-GO-RFQ / Ac quisition de Système de sécu Request for Quota Single Stage - One E Pending Impl IDA / 54290 Project management Post Limited 5,000.00 0.00 2023-04-23 2023-06-02 2023-07-02 rité par vidéo surveillance au tions nvelope ementation profit du ST-RSU BF-PFS-355232-GO-RFQ / Ac quisition d'outils de communi Request for Quota Single Stage - One E Pending Impl cation (gadgets, tee shirt, cas IDA / 54290 Project management Post Limited 154,920.00 0.00 2023-04-16 2023-06-05 2023-09-03 tions nvelope ementation quette, etc) au profit de l'UGP et du ST RSU (O2 LOTS) BF-PFS-355370-GO-RFQ / Ac quisition de consommable inf Request for Quota Single Stage - One E Pending Impl IDA / 54290 Project management Post Limited 45,300.00 0.00 2023-04-24 2023-06-03 2023-07-03 ormatique au profit de l'unité tions nvelope ementation de gestion du projet filets soc iaux BF-PFS-355216-GO-RFQ / Câ blage informatique du bâtime Single Stage - One E Pending Impl IDA / 54290 Project management Post Request for Bids Open - National 160,000.00 0.00 2023-04-25 2023-04-30 2023-06-11 2023-07-11 2023-08-15 2024-02-11 nt du ST/RSU et l'interconnexi nvelope ementation on avec RESINA y compris le l ocal technique BF-PFS-362181-GO-RFQ / Ac quisition de matériel informat ique au profit des stagiaires d Request for Quota Single Stage - One E Pending Impl IDA / 54290 Project management Post Limited 20,000.00 0.00 2023-05-25 2023-06-11 2023-06-26 ans le cadre de l'initiative Ma tions nvelope ementation sse Critiques des Professionn els de Projets et Programmes de Développement BF-PFS-364234-GO-RFQ / Ac quisition de fournitures de bu Request for Quota Single Stage - One E Pending Impl reau dans le cadre du protoc IDA / 54290 Project management Post Limited 5,219.00 0.00 2023-06-03 2023-06-20 2023-07-05 tions nvelope ementation ole de collaboration avec l’Ag ence Nationale de la Formati on Professionnelle (ANFP) BF-PFS-364238-GO-RFQ / Ac quisition de matières d’œuvr Request for Quota Single Stage - One E Pending Impl e dans le cadre du protocole IDA / 54290 Project management Post Limited 36,300.00 0.00 2023-06-03 2023-06-20 2023-07-05 tions nvelope ementation de collaboration avec l’Agenc e Nationale de la Formation P rofessionnelle (ANFP) BF-PFS-364239-GO-RFQ / Ac quisition de matériels informa tiques et péri-informatiques d Request for Quota Single Stage - One E Pending Impl IDA / 54290 Project management Post Limited 4,480.00 0.00 2023-06-03 2023-06-20 2023-07-05 ans le cadre du protocole de tions nvelope ementation collaboration avec l’Agence N ationale de la Formation Prof essionnelle (ANFP) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PFS-17795-NC-RFB / Agen Cash transfers and awarenes Single Stage - One E ce de paiement région du Nor IDA / 54290 s programs for poor and vuln Post Request for Bids Open - National 170,000.00 0.00 Canceled 2017-07-05 2017-09-18 2017-07-05 2017-07-05 2017-07-05 2017-07-05 2017-07-05 nvelope d erable households BF-PFS-49964-NC-DIR / Assur ance Santé au profit du perso IDA / 54290 Project management Post Direct Selection Direct 180,000.00 106,631.92 Completed 2018-02-28 2018-03-22 2018-03-15 2018-03-26 2018-04-04 2018-05-23 2019-04-04 2019-05-31 nnel du PFS BF-PFS-25754-NC-RFB / Agen Cash transfers and awarenes Single Stage - One E ce de paiement pour le Boulki IDA / 54290 s programs for poor and vuln Post Request for Bids Open - National 110,000.00 0.00 Canceled 2017-08-22 2017-08-27 2017-10-08 2017-11-07 2017-12-12 2018-06-10 nvelope emdé, le Lorum et le Passoré erable households BF-PFS-38412-NC-DIR / Reno Cash transfers and awarenes uvellement Contrat Agence d IDA / 54290 s programs for poor and vuln Post Direct Selection Direct 180,000.00 156,584.39 Completed 2017-11-30 2016-11-03 2017-12-05 2018-01-09 2016-12-01 2018-07-08 2017-12-01 e paiement du Nord erable households BF-PFS-51763-NC-DIR / Assur IDA / 54290 Project management Post Direct Selection Direct 40,000.00 15,939.36 Completed 2018-03-12 2018-11-12 2018-03-22 2018-08-20 2018-04-20 2018-09-11 2019-04-20 2018-09-19 ance des véhicules et motos Page 4 BF-PFS-53695-NC-RFB / Agen Cash transfers and awarenes Single Stage - One E ce de paiement pour le Boulki TF / A3975 s programs for poor and vuln Post Request for Bids Open - National 110,000.00 116,965.80 Signed 2017-08-01 2017-08-17 2017-08-11 2018-04-18 2017-09-10 2017-09-26 2017-09-17 2017-09-26 2017-10-16 2017-10-20 2018-10-16 nvelope emdé, Loroum et Passoré erable households BF-PFS-30904-NC-RFQ / Recr utement d'agences de gardie Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 57,800.00 36,596.14 Completed 2018-05-01 2017-08-23 2018-06-26 2017-09-19 2019-06-26 2018-09-19 nnage et de sécurité pour le tions nvelope compte du Projet Filets Socia ux BF-PFS-57178-NC-RFB / Agen Cash transfers and awarenes Single Stage - One E ce de paiement dans le cadre IDA / 54290 s programs for poor and vuln Post Request for Bids Open - National 177,600.00 373,890.82 Signed 2018-04-23 2018-05-07 2018-04-28 2018-06-09 2018-09-28 2018-06-24 2018-09-29 2018-07-29 2019-04-29 2019-07-29 nvelope de la mise en oeuvre du PAD erable households EL BF-PFS-57176-NC-DIR / Assur ance des locaux de l'UGP et l IDA / 54290 Project management Post Direct Selection Direct 15,000.00 0.00 Canceled 2017-02-15 2017-02-20 2017-03-27 2018-03-27 es équipements du projet BF-PFS-48976-NC-RFQ / Tran Request for Quota Single Stage - One E sport et implantation des pla IDA / 54290 Project management Post Limited 10,000.00 0.00 Canceled 2018-03-25 2018-05-04 2018-05-19 tions nvelope ques du projet dans les 42 co mmunes BF-PFS-105867-NC-DIR / Tra Cash transfers and awarenes nsfert monétaires électroniqu IDA / 54290 s programs for poor and vuln Post Direct Selection Direct 727,000.00 0.00 Completed 2019-03-26 2019-04-01 2019-03-31 2019-04-01 2019-05-03 2019-06-21 2020-05-02 2019-06-21 es au profit des ménages bén erable households éficiaires de l'Est et du Centr e Est BF-PFS-114536-NC-DIR / Ren ouvellement de l'assurance s IDA / 54290 Project management Post Direct Selection Direct 123,000.00 103,139.07 Signed 2019-04-09 2019-04-01 2019-04-14 2019-04-10 2019-05-13 2019-05-31 2020-05-12 anté au profit du personnel d u Projet Filets Sociaux BF-PFS-52055-NC-RFQ / Acqu isition d'un système de gestio Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 70,000.00 0.00 Canceled 2018-04-02 2018-05-22 2018-07-21 n électronique et d'archivage tions nvelope des documents BF-PFS-17530-NC-RFQ / Assu Request for Quota Single Stage - One E IDA / 54290 Project management Post Limited 95,000.00 0.00 Canceled 2017-06-23 2017-07-10 2017-08-18 2018-02-14 rance maladie au profit du pe tions nvelope rsonnel BF-PFS-56782-NC-DIR / Recr utement d'un cabinet pour l'a IDA / 54290 Project management Post Direct Selection Direct 40,000.00 0.00 Canceled 2017-01-10 2017-01-15 2017-02-19 2018-02-19 ssistance technique et le recr utement du personnel du proj et BF-PFS-53839-NC-RFB / Réali Cash transfers and awarenes sation de théâtres-forums à l' Single Stage - One E IDA / 54290 s programs for poor and vuln Post Request for Bids Open - National 171,200.00 0.00 Canceled 2018-04-09 2018-04-14 2018-05-26 2018-06-02 2018-07-01 2018-09-29 Est, au Centre-Est, au Loroum nvelope erable households et au Passoré BF-PFS-140254-NC-DIR / Ren ouvellement de l'assurance d IDA / 54290 Project management Post Direct Selection Direct 20,000.00 15,828.79 Signed 2019-09-01 2019-09-01 2019-09-06 2019-09-02 2019-10-11 2019-09-19 2019-10-14 u matériel roulant du PFS BF-PFS-140249-NC-DIR / Ren Cash transfers and awarenes ouvellement du contrat de l'a TF / A3975 s programs for poor and vuln Post Direct Selection Direct 40,000.00 0.00 Signed 2019-10-22 2021-12-10 2019-10-27 2021-12-10 2019-12-01 2020-11-30 gence de paiement pour le Lo erable households rum et le Passoré BF-PFS-140262-NC-RFQ / Ag Request for Quota Single Stage - One E Pending Impl ence de sécurité pour les loca IDA / 54290 Project management Post Limited 22,800.00 0.00 2019-10-25 2019-12-16 2020-12-15 tions nvelope ementation ux du Projet Filets Sociaux BF-PFS-140246-NC-RFQ / Rec Request for Quota Single Stage - One E rutement d'agences de netto IDA / 54290 Project management Post Limited 21,600.00 0.00 Signed 2019-10-25 2019-10-28 2019-12-16 2020-12-15 tions nvelope yage pour le compte du Proje t Filets Sociaux BF-PFS-99913-NC-RFB / Agen Cash transfers and awarenes Single Stage - One E ce de paiement pour les tran IDA / 54290 s programs for poor and vuln Post Request for Bids Open - National 530,000.00 0.00 Canceled 2019-02-25 2019-03-05 2019-03-07 2019-04-06 2019-04-13 2019-05-12 2020-05-11 nvelope sferts électroniques dans la r erable households égion de l'Est BF-PFS-140261-NC-DIR / Ren ouvellement du contrat de l'a Cash transfers and awarenes Pending Impl gence pour le transfert moné IDA / 54290 s programs for poor and vuln Post Direct Selection Direct 376,960.00 0.00 2019-11-04 2019-11-09 2019-12-14 2020-12-13 ementation taires électroniques au profit erable households des ménages bénéficiaires de l'Est et du Centre Est BF-PFS-168971-NC-DIR / Tra nsferts monétaires physiques Cash transfers and awarenes au profit des bénéficiaires de IDA / D4760 s programs for poor and vuln Post Direct Selection Direct 22,000.00 0.00 Signed 2020-04-20 2020-03-10 2020-04-25 2020-04-02 2020-05-20 2020-06-19 la subvention productive au ti erable households tre de la mesure 6 dans la ré gion du Nord BF-PFS-168977-NC-RFQ / Ass Request for Quota Single Stage - One E urance maladie du personnel IDA / D4760 Project management Post Limited 90,000.00 0.00 Signed 2020-04-29 2020-05-05 2020-06-24 2020-12-21 tions nvelope du projet filets sociaux BF-PFS-171201-NC-DIR / Tra nsferts monétaires électroniq ue au profit des personnes vu Contingent Emergency Resp IDA / D4760 Post Direct Selection Direct 92,000.00 0.00 Signed 2020-04-30 2020-03-05 2020-05-03 2020-04-24 2020-05-15 2020-08-13 lnérables affectées par la pan onse Component demie du COVID 19 et les per sonnes indigentes de Ouagad ougou BF-PFS-195596-NC-RFQ / Ass Request for Quota Single Stage - One E urance des véhicules et moto IDA / D4760 Project management Post Limited 20,000.00 0.00 Signed 2020-09-30 2020-11-20 2020-11-01 2021-11-01 tions nvelope s du projet BF-PFS-54420-NC-RFB / Réali Cash transfers and awarenes Single Stage - One E sation de supports audio visu IDA / 54290 s programs for poor and vuln Post Request for Bids Open - National 300,000.00 0.00 Canceled 2018-04-20 2019-10-21 2018-04-25 2018-06-06 2018-07-06 2018-08-10 2019-02-06 nvelope el au profit du projet Filets so erable households ciaux BF-PFS-229261-NC-DIR / Séle ction des opérateurs de trans ferts monétaires au profit des ménages internes pauvres et Cash transfers and awarenes Under Imple vulnérables issues des ména IDA / 64340 s programs for poor and vuln Post Direct Selection Direct 780,000.00 0.00 2021-04-14 2021-06-03 2021-04-19 2021-05-24 2021-11-20 mentation ges des déplacés, des comm erable households unautés hôtes et des réfugiés de la Boucle du Mouhoun, du Nord, du Centre nord, du Sah el et du Centre BF-PFS-231181-NC-RFQ / Sél ection de radios communauta Cash transfers and awarenes Request for Quota Single Stage - One E ires pour la réalisation d'activ IDA / 64340 s programs for poor and vuln Post Limited 250,000.00 207,344.47 Signed 2021-04-27 2021-07-14 2021-06-22 2021-12-04 2021-12-19 tions nvelope ités de sensibilisation et de c erable households ommunication du projet Filets sociaux BF-PFS-236703-NC-DIR / Ren ouvellement du contrat de l’a IDA / 64340 Project management Post Direct Selection Direct 98,000.00 51,066.53 Signed 2021-05-28 2021-05-10 2021-06-02 2021-05-17 2021-07-07 2021-07-16 2022-01-03 gence d’assurance maladie d u personnel du Projet Filets S ociaux Page 5 BF-PFS-236707-NC-DIR / Ren ouvellement des contrats d'e ntretien et de maintenance d IDA / 64340 Project management Post Direct Selection Direct 52,000.00 39,278.83 Signed 2021-05-28 2021-06-15 2021-06-02 2021-06-22 2021-07-07 2021-07-13 2022-01-03 e divers équipements du Proj et Filets Sociaux (Groupe élec trogène, plomberie sanitaire, climatiseurs, matériel roulant ). BF-PFS-241483-NC-DIR / Ren ouvellement du contrat de m aintenance préventive et cur IDA / 64340 Project management Post Direct Selection Direct 16,000.00 0.01 Signed 2021-06-29 2021-06-10 2021-07-04 2021-06-22 2021-08-08 2021-07-13 2022-02-04 ative du matériel informatiqu e et péri-informatique du Proj et Filets Sociaux BF-PFS-244343-NC-RFB / Rec Cash transfers and awarenes rutement d’un prestataire po Single Stage - One E IDA / 64340 s programs for poor and vuln Post Request for Bids Open - National 457,760.00 0.00 Signed 2021-07-26 2021-11-15 2021-07-31 2022-05-05 2021-09-11 2021-12-20 2021-10-11 2021-12-30 2021-11-15 2022-05-14 ur la production de boîtes a i nvelope erable households mages au profit du projet filet s sociaux BF-PFS-261515-NC-RFQ / Rec rutement d’une agence de co Cash transfers and awarenes Request for Quota Single Stage - One E mmunication pour la réalisati IDA / 64340 s programs for poor and vuln Post Limited 62,600.00 0.00 Signed 2021-11-15 2021-11-02 2022-01-10 2021-12-01 2022-07-09 tions nvelope on de films documentaires au erable households profit du Projet Filets Sociaux BF-PFS-264482-NC-DIR / Ren ouvellement du contrat d'ass IDA / 64340 Project management Post Direct Selection Direct 18,956.00 12,620.30 Signed 2021-11-29 2021-10-04 2021-12-04 2021-10-08 2022-01-08 2021-12-01 2022-07-07 urance des véhicules de l'unit é de gestion du Projet Filets S ociaux BF-PFS-275635-NC-DIR / Ren ouvellement du contrat d’ent IDA / 64340 Project management Post Direct Selection Direct 30,000.00 19,326.63 Signed 2022-01-31 2021-12-08 2022-02-05 2021-12-13 2022-03-12 2022-01-02 2022-09-08 retien et de nettoyage des lo caux de l’unité de gestion du Projet Filets Sociaux BF-PFS-275637-NC-DIR / Ren ouvellement du contrat de ga rdiennage et de surveillance IDA / 64340 Project management Post Direct Selection Direct 30,000.00 25,156.93 Signed 2022-01-31 2021-12-10 2022-02-05 2021-12-13 2022-03-12 2022-01-02 2022-09-08 des locaux de l’unité de gesti on du Projet Filets Sociaux BF-PFS-275639-NC-DIR / Ren ouvellement des contrats d'e ntretien et de maintenance d e divers équipements du Proj IDA / 64340 Project management Post Direct Selection Direct 78,000.00 52,429.40 Signed 2022-02-08 2022-01-02 2022-02-13 2022-01-05 2022-03-20 2022-01-02 2022-09-16 et Filets Sociaux (Groupe élec trogène, plomberie sanitaire, climatiseurs, matériel roulant , matériel informatique, télép honique et vidéo surveillance ) BF-PFS-278580-NC-DIR / Con trat cadre avec MOOV AFRICA pour l'acquisition de téléphon es portables, de cartes SIM id Cash transfers and awarenes entifiées et munies de compt IDA / 64340 s programs for poor and vuln Post Direct Selection Direct 1,322,412.00 1,466,712.00 Signed 2022-02-16 2021-03-08 2022-02-21 2021-04-08 2022-03-28 2021-06-09 2022-09-24 es mobiles et d'opérations de erable households transferts monétaires électro niques au profit des bénéficia ires dans diverses régions du Burkina Faso. BF-PFS-278611-NC-DIR / Con trat cadre avec WIZALL BURK INA pour l'acquisition de télé phones portables, de cartes S Cash transfers and awarenes IM identifiées et munies de co IDA / 64340 s programs for poor and vuln Post Direct Selection Direct 446,000.00 363,933.00 Signed 2022-02-16 2021-03-10 2022-02-21 2021-04-08 2022-03-28 2021-06-09 2022-09-24 mptes mobiles et d'opération erable households s de transferts monétaires él ectroniques au profit des bén éficiaires dans diverses régio ns du Burkina Faso. BF-PFS-278620-NC-DIR / Con trat cadre avec ORANGE MON EY pour l'acquisition de télép hones portables, de cartes SI Cash transfers and awarenes M identifiées et munies de co IDA / 64340 s programs for poor and vuln Post Direct Selection Direct 696,000.00 566,118.00 Signed 2022-02-16 2021-03-08 2022-02-21 2021-04-08 2022-03-28 2021-08-05 2022-09-24 mptes mobiles et d'opération erable households s de transferts monétaires él ectroniques au profit des bén éficiaires dans diverses régio ns du Burkina Faso. BF-PFS-293368-NC-RFQ / Ass urance maladie au profit du p Request for Quota Single Stage - One E Pending Impl IDA / 64340 Project management Post Limited 90,000.00 0.00 2022-05-24 2022-07-19 2023-01-15 ersonnel de l’unité de gestion tions nvelope ementation du projet filets sociaux BF-PFS-297616-NC-DIR / Ren ouvellement du contrat d'ass urance maladie au profit du p IDA / 64340 Project management Post Direct Selection Direct 90,000.00 0.00 Signed 2022-06-01 2022-05-30 2022-06-06 2021-05-31 2022-07-11 2023-01-07 ersonnel de l'unité de gestion du Projet Filets Sociaux BF-PFS-355085-NC-DIR / Ren ouvellement des contrats d'e ntretien et de maintenance d e divers équipements du Proj Pending Impl IDA / 64340 Project management Post Direct Selection Direct - National 72,000.00 0.00 2023-04-06 2023-04-11 2023-05-16 2024-05-10 et Filets Sociaux (Groupe élec ementation trogène, plomberie sanitaire, climatiseurs, matériel roulant , matériel informatique, télép honique et vidéo surveillance ) BF-PFS-355208-NC-DIR / Ren ouvellement du contrat d'Ent Pending Impl IDA / 64340 Project management Post Direct Selection Direct - National 30,000.00 0.00 2023-04-05 2023-04-10 2023-05-15 2024-05-14 retien et nettoyage des locau ementation x de l'unité de gestion du pro jet filets sociaux BF-PFS-355209-NC-DIR / Ren ouvellement du contrat de ga Pending Impl rdiennage et surveillance des IDA / 64340 Project management Post Direct Selection Direct - National 30,000.00 0.00 2023-04-05 2023-04-10 2023-05-15 2023-11-11 ementation locaux de l'unité de gestion du projet filets sociaux BF-PFS-355227-NC-DIR / Mai Request for Quota Single Stage - One E Pending Impl ntenance informatique au pro IDA / 64340 Project management Post Limited 12,000.00 0.00 2023-04-23 2023-06-18 2023-12-15 tions nvelope ementation fit du ST-RSU BF-PFS-355228-NC-RFQ / Ent Request for Quota Single Stage - One E Pending Impl IDA / 64340 Project management Post Limited 6,000.00 0.00 2023-04-23 2023-06-18 2024-04-13 retien des motos au profit du tions nvelope ementation ST-RSU BF-PFS-355229-NC-RFQ / Ent Request for Quota Single Stage - One E Pending Impl IDA / 64340 Project management Post Limited 7,000.00 0.00 2023-04-23 2023-06-18 2024-04-13 retien de locaux au profit du tions nvelope ementation ST-RSU BF-PFS-355230-NC-RFQ / Gar Request for Quota Single Stage - One E Pending Impl diennage de locaux au profit IDA / 64340 Project management Post Limited 5,000.00 0.00 2023-04-23 2023-06-18 2024-04-13 tions nvelope ementation du ST-RSU Page 6 BF-PFS-355328-NC-DIR / Ren ouvellement du contrat de RA Cash transfers and awarenes DIO SAVANE FM pour la réalis Pending Impl IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 59,023.00 0.00 2023-04-06 2023-04-11 2023-05-16 2024-05-10 ation des couvertures médiati ementation erable households ques des activités du Projet Fi lets Sociaux dans la région d u Centre BF-PFS-358249-NC-DIR / Ren ouvellement du contrat de RA Cash transfers and awarenes DIO MANEGDA KAYA pour la r Pending Impl IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 49,868.00 0.00 2023-04-24 2023-04-29 2023-06-03 2024-05-28 éalisation des couvertures m ementation erable households édiatiques des activités du Pr ojet Filets Sociaux dans la rég ion du Centre Nord. BF-PFS-358252-NC-DIR / Ren ouvellement du contrat de la Cash transfers and awarenes RADIO MUNICIPALE DE DORI Pending Impl IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 48,860.00 0.00 2023-04-24 2023-04-29 2023-06-03 2024-01-19 pour la réalisation des couver ementation erable households tures médiatiques des activit és du Projet Filets Sociaux da ns la région du Sahel. BF-PFS-358254-NC-DIR / Ren ouvellement du contrat de RA Cash transfers and awarenes DIO SALAKI pour la réalisatio Pending Impl IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 49,860.00 0.00 2023-04-24 2023-04-29 2023-06-03 2024-05-28 n des couvertures médiatique ementation erable households s des activités du Projet Filets Sociaux dans la région de la Boucle du Mouhoun. BF-PFS-358255-NC-DIR / Ren ouvellement du contrat de RA Cash transfers and awarenes DIO LA VOIX DU PAYSAN pour Pending Impl IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 49,860.00 0.00 2023-04-24 2023-04-29 2023-06-03 2024-05-28 la réalisation des couvertures ementation erable households médiatiques des activités du Projet Filets Sociaux dans la r égion du Nord. CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PFS-22748-CS-CQS / Recr utement de prestataires pour Laying the foundations for a Consultant Qualifi la réalisation de vidéos comm IDA / 54290 basic national safety net syst Post Open - National 28,000.00 0.00 Canceled 2017-08-20 2017-09-10 2017-10-24 2017-11-23 2017-12-28 2018-06-26 cation Selection unautaires au profit des villag em es de la région du Nord BF-PFS-49406-CS-QCBS / Au Quality And Cost-B dit des comptes 2018 et 201 IDA / 54290 Project management Post Open - National 40,000.00 96,319.84 Signed 2018-04-16 2018-06-18 2018-05-07 2018-06-20 2018-09-05 2018-07-20 2019-01-18 2018-08-19 2019-01-21 2018-09-23 2019-04-08 2018-10-22 2019-06-10 2018-12-21 ased Selection 9 du projet BF-PFS-68278-CS-CQS / ONG Cash transfers and awarenes Consultant Qualifi pour la sensibilisation dans la IDA / 54290 s programs for poor and vuln Post Open - National 540,000.00 500,052.11 Signed 2017-03-10 2017-04-10 2017-03-31 2017-05-14 2017-12-28 2017-06-13 2018-01-25 2017-07-18 2018-10-03 2018-07-18 cation Selection région de l'Est erable households BF-PFS-68283-CS-CQS / ONG Cash transfers and awarenes Consultant Qualifi pour la sensibilisation dans la IDA / 54290 s programs for poor and vuln Post Open - National 300,000.00 260,150.35 Signed 2017-03-10 2017-04-10 2017-03-31 2017-05-14 2017-12-28 2017-06-13 2018-01-25 2017-07-18 2018-10-03 2018-07-18 cation Selection région du Centre Est erable households BF-PFS-68280-CS-CQS / Réali Cash transfers and awarenes sation de 51 cinés-débats au Consultant Qualifi IDA / 54290 s programs for poor and vuln Post Open - National 30,100.00 22,564.70 Signed 2017-03-10 2017-03-10 2017-03-31 2017-05-14 2017-12-28 2017-06-13 2018-01-26 2017-07-18 2018-08-31 2017-08-17 YATENGA (Ouahigouya, Oula cation Selection erable households et Namissiguima) BF-PFS-68342-CS-CQS / Réali Cash transfers and awarenes sation de 47 cinés-débats au Consultant Qualifi IDA / 54290 s programs for poor and vuln Post Open - National 28,000.00 24,548.44 Completed 2017-03-10 2017-03-10 2017-03-31 2017-05-14 2017-12-28 2017-06-13 2018-01-26 2017-07-18 2018-08-31 2017-08-12 2019-01-28 YATENGA (Barga,Kain, Koum cation Selection erable households bri,Tangaye,Thiou et Zogoré) BF-PFS-68341-CS-CQS / Réali Cash transfers and awarenes Consultant Qualifi sation de 29 cinés-débats au IDA / 54290 s programs for poor and vuln Post Open - National 17,200.00 12,830.91 Signed 2017-03-10 2017-03-10 2017-03-31 2017-05-14 2017-12-28 2017-06-13 2018-01-26 2017-07-18 2018-09-13 2017-09-01 cation Selection ZONDOMA erable households BF-PFS-68281-CS-CQS / Réali Cash transfers and awarenes sation de 51 théâtres forums Consultant Qualifi IDA / 54290 s programs for poor and vuln Post Open - National 36,200.00 27,077.63 Signed 2017-03-10 2017-03-10 2017-03-31 2017-05-14 2017-12-28 2017-06-13 2018-01-26 2017-07-18 2018-08-31 2017-08-17 au YATENGA (Ouahigouya, O cation Selection erable households ula et Namissiguima) BF-PFS-68272-CS-CQS / Réali Cash transfers and awarenes sation de 47 théâtres forums Consultant Qualifi IDA / 54290 s programs for poor and vuln Post Open - National 34,000.00 29,445.60 Signed 2017-03-10 2017-03-10 2017-03-31 2017-05-14 2017-12-28 2017-06-13 2018-01-26 2017-07-18 2018-08-31 2017-08-12 au YATENGA (Barga,Kain, Ko cation Selection erable households umbri,Tangaye,Thiou et Zogo ré) BF-PFS-68276-CS-CQS / Réali Cash transfers and awarenes Consultant Qualifi sation de 29 théâtres forums IDA / 54290 s programs for poor and vuln Post Open - National 21,000.00 18,025.35 Signed 2017-03-10 2017-03-10 2017-03-31 2017-05-14 2017-12-28 2017-06-13 2018-01-26 2017-07-18 2018-08-31 2017-08-12 cation Selection au ZONDOMA erable households BF-PFS-17941-CS-CQS / ONG Cash transfers and awarenes Consultant Qualifi pour la Sensibilisation dans la IDA / 54290 s programs for poor and vuln Post Open - National 100,000.00 0.00 Canceled 2017-07-03 2017-04-10 2017-07-03 2017-09-07 2017-07-03 2017-12-28 2017-07-03 2017-07-03 2017-07-03 cation Selection Région de l'Est et du Centre- erable households Est BF-PFS-17935-CS-CQS / Sens Cash transfers and awarenes ibilisation par le canal du thé Consultant Qualifi IDA / 54290 s programs for poor and vuln Post Open - National 40,000.00 0.00 Canceled 2017-05-15 2017-09-11 2017-05-15 2017-05-15 2017-05-15 2017-05-15 2017-05-15 atre forum et des cinés débat cation Selection erable households s Région du Nord BF-PFS-30755-CS-QCBS / Ser Laying the foundations for a vice de consultants pour la ré Consultant Qualifi IDA / 54290 basic national safety net syst Post Open - National 195,000.00 0.00 Canceled 2017-10-25 2017-11-27 2017-11-15 2017-12-06 2017-12-29 2018-01-28 2018-03-04 2018-08-31 alisation de l'enquête de bas cation Selection em e dans les Provinces du Nord BF-PFS-100385-CS-CQS / Rec rutement de prestataires pou Cash transfers and awarenes Consultant Qualifi r la réalisation de vidéos com TF / A3975 s programs for poor and vuln Post Open - National 54,000.00 0.00 Signed 2019-02-25 2019-02-17 2019-03-27 2023-06-01 2019-04-08 2019-08-26 2019-04-23 2019-10-24 2019-05-22 2019-08-20 cation Selection munautaires au profit des vill erable households ages de la région du Nord BF-PFS-106835-CS-CQS / Proj ections d'une vidéo commun Cash transfers and awarenes Consultant Qualifi autaire dans le cadre de la mi TF / A3975 s programs for poor and vuln Post Open - National 54,000.00 45,862.91 Signed 2019-02-25 2019-03-24 2019-03-27 2019-09-03 2019-04-08 2019-09-11 2019-04-23 2019-10-17 2019-05-22 2019-10-28 2019-08-20 cation Selection se en œuvre des mesures pro erable households ductives dans la région du No rd BF-PFS-120124-CS-LCS / Org Cash transfers and awarenes anisation des microprogram Least Cost Selecti IDA / 54290 s programs for poor and vuln Post Open - National 231,000.00 0.00 Canceled 2019-09-02 2019-10-07 2019-09-23 2019-11-06 2019-12-04 2019-12-18 2020-01-15 2020-02-19 2020-05-19 mes, des cinés -débats et des on erable households théatres-forum dans la Régio n du Nord Page 7 BF-PFS-120123-CS-LCS / Org Cash transfers and awarenes anisation des microprogram Least Cost Selecti Under Implement IDA / 54290 s programs for poor and vuln Post Open - National 130,300.00 0.00 2019-09-02 2019-10-07 2019-09-23 2019-11-06 2019-12-04 2020-01-03 2020-02-07 2020-03-13 2020-06-11 mes, des cinés -débats et des on ation erable households théatres-forum dans la Régio n de l'Est BF-PFS-119884-CS-LCS / Org Cash transfers and awarenes anisation des microprogram Least Cost Selecti IDA / 54290 s programs for poor and vuln Post Open - National 206,900.00 0.00 Canceled 2019-09-02 2019-10-07 2019-09-23 2019-11-06 2019-12-04 2020-01-03 2020-01-31 2020-02-28 2020-05-28 mes, des cinés -débats et des on erable households théatres-forum dans la Régio n du Centre-Est BF-PFS-49650-CS-CQS / Réali Consultant Qualifi sation d'émissions spéciales r IDA / 54290 Project management Post Open - National 12,000.00 0.00 Canceled 2018-05-07 2018-05-28 2018-07-04 2018-08-03 2018-09-01 2018-11-30 cation Selection adio/télé sur le projet BF-PFS-49397-CS-CQS / Form ation des PRC à l'utilisation d Consultant Qualifi es données géosatellitaires p TF / A3975 Project management Post Open - National 24,000.00 0.00 Canceled 2018-05-10 2018-05-31 2018-07-14 2018-07-21 2018-08-19 2018-09-18 cation Selection our la production et la comm ercialisation des produits agr opastoraux BF-PFS-49394-CS-CQS / Appu i/accompagnement du projet Cash transfers and awarenes Consultant Qualifi en ACV et GERME dans le cad TF / A3975 s programs for poor and vuln Post Open - National 24,000.00 0.00 Canceled 2018-04-09 2018-04-30 2018-06-13 2018-06-27 2018-07-26 2018-09-24 cation Selection re de la mise en œuvre des erable households mesures d'accompagnement productives BF-PFS-119673-CS-CQS / Org Cash transfers and awarenes anisation des microprogram Consultant Qualifi IDA / 54290 s programs for poor and vuln Post Open - National 700.00 0.00 Canceled 2019-09-02 2019-09-23 2019-10-23 2019-11-22 2019-12-11 2019-12-18 mes, des cinés -débats et des cation Selection erable households théatres-forum dans la Régio n du Sahel BF-PFS-119885-CS-QCBS / C Laying the foundations for a onception et développement Quality And Cost-B IDA / 54290 basic national safety net syst Post Open - National 500,000.00 0.00 Canceled 2019-11-28 2019-09-24 2019-12-19 2020-02-01 2020-02-29 2020-03-30 2020-05-04 2020-06-08 2021-06-08 du Registre Unique et la form ased Selection em ation aux outils de développe ment BF-PFS-119672-CS-CQS / Org anisation des microprogram Cash transfers and awarenes Consultant Qualifi mes, des cinés -débats et des IDA / 54290 s programs for poor and vuln Post Open - National 750.00 0.00 Canceled 2019-09-02 2019-10-07 2019-09-23 2019-10-23 2019-11-22 2019-12-11 2019-12-18 cation Selection théatres-forum dans la Provin erable households ce du BOULKIEMDE (Région d u Centre-Ouest) BF-PFS-49396-CS-QCBS / Ré Laying the foundations for a Quality And Cost-B alisation de l'enquête de bas TF / A3975 basic national safety net syst Post Open - National 600,000.00 0.00 Canceled 2018-04-02 2018-04-23 2018-06-06 2018-07-06 2018-08-05 2018-09-09 2018-10-14 2019-01-12 ased Selection e dans la région du Nord em BF-PFS-49393-CS-QCBS / Enq Cash transfers and awarenes Quality And Cost-B uête de base pour l'évaluatio TF / A3975 s programs for poor and vuln Post Open - National 800,000.00 0.00 Canceled 2018-03-12 2018-04-02 2018-05-16 2018-06-15 2018-07-15 2018-08-19 2018-09-23 2018-11-22 ased Selection n d'impact au Nord erable households BF-PFS-167750-CS-CQS / Sél ection de cabinet pour le recr Consultant Qualifi IDA / 54290 Project management Post Open - National 12,000.00 0.00 Signed 2020-04-13 2020-04-09 2020-04-15 2020-04-26 2020-05-12 2020-05-01 2020-05-21 2020-05-09 2020-07-08 utement du personnel compl cation Selection émentaire du PFS BF-PFS-171202-CS-CQS / Ela boration d’une stratégie glob Consultant Qualifi IDA / 54290 Project management Post Open - National 19,500.00 0.00 Signed 2020-04-20 2020-05-20 2020-04-30 2023-05-24 2020-05-06 2020-05-12 2020-05-11 2020-05-20 2020-06-09 2020-08-08 ale de communication du MF cation Selection SNFAH et du projet filets soci aux BF-PFS-168966-CS-CQS / ON Productive Labor-Intensive P Consultant Qualifi G locale pour la mise en œuv IDA / 64340 Post Open - National 85,000.00 0.00 Canceled 2020-04-23 2020-04-24 2020-05-14 2020-06-27 2020-07-12 2020-08-16 2021-02-12 ublic Works (LIPW) Program cation Selection re des THIMO au Séno BF-PFS-202211-CS-FBS / ON Cash transfers and awarenes G locale pour la mise en œuv Fixed Budget Sele IDA / 64340 s programs for poor and vuln Post Open - International 672,000.00 534,634.88 Signed 2020-11-09 2021-04-02 2020-11-24 2021-01-07 2021-02-18 2021-02-19 2021-04-13 2021-03-21 2021-04-16 2021-04-25 2021-05-25 2021-05-30 2021-07-16 2022-05-30 re des activités du projet dan ction erable households s la région du Sahel BF-PFS-228650-CS-QBS / Rec rutement d’un cabinet pour l’ Cash transfers and awarenes Quality Based Sele Under Implement élaboration d’un manuel d’au IDA / 64340 s programs for poor and vuln Post Open - National 110,130.00 0.00 2021-04-09 2021-09-17 2021-04-30 2021-06-13 2021-07-11 2021-08-10 2021-09-09 2021-10-14 2022-10-14 ction ation dit et d’une cartographie des erable households risques pour le projet filets so ciaux BF-PFS-205406-CS-FBS / Rec rutement de trois (03) ONGs l Cash transfers and awarenes ocale pour la mise en œuvre Fixed Budget Sele IDA / 64340 s programs for poor and vuln Prior Open - International 2,016,000.00 0.00 Canceled 2020-11-18 2021-09-13 2020-12-09 2021-01-22 2021-02-19 2021-03-21 2021-04-25 2021-05-30 2022-05-30 des activités dans les régions ction erable households de la Boucle du Mouhoun, du Centre nord et du Nord. BF-PFS-257964-CS-FBS / Rec rutement d’ONG locale pour l Cash transfers and awarenes Fixed Budget Sele a mise en œuvre des activité IDA / 64340 s programs for poor and vuln Post Open - National 1,316,000.00 1,062,075.07 Signed 2021-10-12 2021-09-13 2021-11-02 2021-12-16 2021-07-19 2022-01-13 2021-08-09 2022-02-12 2021-08-17 2022-03-19 2021-11-29 2022-04-23 2022-01-29 2023-04-23 ction s dans les nouvelles zones d’i erable households ntervention du Projet Filets S ociaux (Centre Nord) BF-PFS-257966-CS-FBS / Rec rutement d’ONG locale pour l Cash transfers and awarenes Fixed Budget Sele a mise en œuvre des activité IDA / 64340 s programs for poor and vuln Post Open - National 672,000.00 486,271.29 Signed 2021-10-12 2021-09-13 2021-11-02 2021-12-16 2021-07-19 2022-01-13 2021-08-09 2022-02-12 2021-08-17 2022-03-19 2021-08-17 2022-04-23 2022-01-21 2023-04-23 ction s dans les nouvelles zones d’i erable households ntervention du Projet Filets S ociaux (Nord) BF-PFS-257971-CS-FBS / Rec rutement d’ONG locale pour l Cash transfers and awarenes a mise en œuvre des activité Fixed Budget Sele IDA / 64340 s programs for poor and vuln Post Open - National 1,120,000.00 905,642.17 Signed 2021-10-12 2021-09-13 2021-11-02 2021-12-16 2021-07-19 2022-01-13 2021-08-09 2022-02-12 2021-08-17 2022-03-19 2021-11-30 2022-04-23 2022-01-21 2023-04-23 s dans les nouvelles zones d’i ction erable households ntervention du Projet Filets S ociaux (Boucle du Mouhoun) BF-PFS-257989-CS-CQS / Rec rutement de cabinets pour la Cash transfers and awarenes réalisation de Post Distributio Consultant Qualifi Under Implement IDA / 64340 s programs for poor and vuln Post Open - National 262,360.00 0.00 2021-10-28 2021-11-25 2021-11-18 2022-01-01 2022-01-31 2022-03-07 2022-09-03 n Monitoring (PDM) ou enquê cation Selection ation erable households te post paiement dans les rég ions d’intervention du Projet Filets Sociaux BF-PFS-257992-CS-CQS / Rec rutement de cabinets pour la Cash transfers and awarenes réalisation des appels téléph Consultant Qualifi Pending Impleme IDA / 64340 s programs for poor and vuln Post Open - National 76,546.00 0.00 2021-10-28 2021-11-18 2022-01-01 2022-01-31 2022-03-07 2022-09-03 oniques ou Phone Call dans le cation Selection ntation erable households s différentes régions d’interv ention du Projet Filets Sociau x. BF-PFS-264480-CS-LCS / Aud it financier et comptable du p Least Cost Selecti IDA / 64340 Project management Post Open - National 120,000.00 0.00 Signed 2021-11-30 2021-11-19 2021-12-21 2023-06-08 2022-02-03 2022-10-19 2022-03-03 2021-03-15 2022-04-02 2022-06-07 2022-05-07 2022-08-22 2022-06-11 2022-12-08 rojet pour les exercices 2021, on 2022, 2023 et la période de g râce Page 8 BF-PFS-293362-CS-CQS / Rec rutement d’une ONG pour la conception des outils et la for Laying the foundations for a Consultant Qualifi Under Implement mation des animateurs des O IDA / 64340 basic national safety net syst Post Open - National 170,000.00 0.00 2022-05-09 2022-05-20 2022-05-30 2022-07-13 2022-08-12 2022-09-16 2023-03-15 cation Selection ation NG sur les mesures d’accomp em agnement productives dans l es régions du nord et du Sah el du Burkina Faso BF-PFS-316349-CS-CQS / Rec rutement d’un cabinet charge Cash transfers and awarenes du recrutement et de la gesti Consultant Qualifi IDA / 64340 s programs for poor and vuln Post Open - National 4,358.00 0.00 Signed 2022-09-16 2022-10-10 2022-09-26 2023-06-15 2022-10-06 2022-10-22 2022-10-11 2022-11-15 2022-10-17 2023-10-12 on d’opérateurs pour l’opérat cation Selection erable households ionnalisation du centre d’app el du projet filets sociaux BF-PFS-320834-CS-CQS / Rec rutement d’une agence de co Cash transfers and awarenes Consultant Qualifi mmunication pour la mise en IDA / 64340 s programs for poor and vuln Post Open - National 20,000.00 0.00 Signed 2022-10-17 2022-10-17 2022-10-27 2023-06-03 2022-11-06 2022-12-12 2022-11-11 2023-02-09 2022-11-17 2023-11-17 cation Selection œuvre des activités de comm erable households unication du projet filets soci aux. BF-PFS-327451-CS-CQS / Sél Cash transfers and awarenes ection d’un cabinet en charge Consultant Qualifi IDA / 64340 s programs for poor and vuln Post Open - National 2,000.00 0.00 Signed 2022-11-28 2023-01-17 2022-12-08 2023-03-07 2022-12-18 2022-11-26 2022-12-23 2022-12-08 2022-12-29 2023-01-28 du recrutement d’un (e) spéci cation Selection erable households aliste en sauvegardes sociale s du PFS-BNS BF-PFS-355233-CS-CQS / Sél ection d'un cabinet pour le re Consultant Qualifi Pending Impleme IDA / 64340 Project management Post Open - National 20,000.00 0.00 2023-04-30 2023-05-21 2023-07-04 2023-08-03 2023-09-07 2024-03-05 crutement de personnel au pr cation Selection ntation ofit de l'Unité de gestion du P rojet Filets Sociaux BF-PFS-355324-CS-CDS / Rec rutement d'un consultant pou Laying the foundations for a r la formation des animateurs Consultant Qualifi Pending Impleme IDA / 64340 basic national safety net syst Post Open - National 430,776.00 0.00 2023-04-24 2023-05-15 2023-06-13 2023-07-13 2023-08-17 2024-05-13 des ONG et des équipes proje cation Selection ntation em t en inclusion économique (F ormation et suivi AVEC, coac hing et PAS) BF-PFS-355335-CS-CQS / Rec rutement d'un consultant pou r la mise en place d'un systè Consultant Qualifi Pending Impleme IDA / 64340 Project management Post Open - National 25,800.00 0.00 2023-04-25 2023-05-16 2023-06-29 2023-07-29 2023-09-02 2023-10-17 me de secours Interne de sau cation Selection ntation vegarde et de restauration de s données des application MI S et de Planification BF-PFS-355348-CS-CQS / Ela Consultant Qualifi Under Implement boration de la Stratégie de co IDA / 64340 Project management Post Open - National 20,000.00 0.00 2023-04-10 2020-04-30 2023-05-01 2023-06-14 2023-07-14 2023-08-18 2023-10-02 cation Selection ation mmunication du RSU (Cabine t) BF-PFS-355351-CS-CQS / Rec rutement d'ONG pour la mise en œuvre des activités de cib Laying the foundations for a Quality And Cost-B Pending Impleme lage communautaire dans 05 IDA / 64340 basic national safety net syst Prior Open - National 2,625,000.00 0.00 2023-05-08 2023-05-29 2023-07-12 2023-08-09 2023-09-08 2023-10-13 2023-11-17 2024-01-01 ased Selection ntation régions dans le cadre de l'op em érationnalisation du Registre social unique (RSU) (mise à l' echelle) BF-PFS-365491-CS-QCBS / R ecrutement d’une ONG pour l a mise en œuvre des activité Cash transfers and awarenes Consultant Qualifi Under Implement s de ciblage communautaire IDA / 64340 s programs for poor and vuln Post Open - National 272,930.00 0.00 2023-06-12 2023-06-26 2023-06-26 2023-07-31 2023-08-05 2023-08-15 2023-09-29 cation Selection ation dans la région du Nord dans l erable households e cadre de l’opérationnalisati on du Registre social unique ( RSU) (phase de mise à l’échel le) BF-PFS-365495-CS-QCBS / R ecrutement d’une ONG pour l a mise en œuvre des activité s de ciblage communautaire Cash transfers and awarenes Consultant Qualifi Under Implement dans la région de la Boucle d IDA / 64340 s programs for poor and vuln Post Open - National 329,270.00 0.00 2023-06-12 2023-06-26 2023-06-26 2023-07-31 2023-08-05 2023-08-15 2023-09-29 cation Selection ation u Mouhoun et des Hauts-Bass erable households ins dans le cadre de l’opérati onnalisation du Registre soci al unique (RSU) (phase de mi se à l’échelle) BF-PFS-365496-CS-QCBS / R ecrutement d’une ONG pour l a mise en œuvre des activité Cash transfers and awarenes s de ciblage communautaire Quality And Cost-B Under Implement IDA / 64340 s programs for poor and vuln Post Open - National 1,088,165.00 0.00 2023-06-12 2023-06-26 2023-06-26 2023-07-06 2023-08-05 2023-08-19 2023-09-06 2023-09-23 2023-11-07 dans la région du Plateau Cen ased Selection ation erable households tral et du Centre-Sud dans le cadre de l’opérationnalisation du Registre social unique (RS U) (phase de mise à l’échelle) BF-PFS-365498-CS-QCBS / R ecrutement d’une ONG pour l a mise en œuvre des activité Cash transfers and awarenes s de ciblage communautaire Consultant Qualifi Under Implement IDA / 64340 s programs for poor and vuln Post Open - National 217,750.00 0.00 2023-06-12 2023-06-26 2023-06-26 2023-07-31 2023-08-05 2023-08-15 2023-09-29 dans la région du Sud-Ouest cation Selection ation erable households dans le cadre de l’opérationn alisation du Registre social u nique (RSU) (phase de mise à l’échelle) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Con Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant tract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BF-PFS-17944-CS-INDV / Eval Laying the foundations for a Individual Consult uation processus de paiemen IDA / 54290 basic national safety net syst Post Limited 12,000.00 8,777.13 Completed 2017-05-02 2017-01-20 2017-05-02 2017-12-21 2017-05-02 2018-01-10 2017-05-02 2018-03-22 2017-05-02 2018-05-12 ant Selection t dans le nord em BF-PFS-17945-CS-INDV / For Individual Consult mation des FACOM et des CR IDA / 54290 Project management Post Limited 11,000.00 8,612.46 Completed 2017-11-15 2018-05-30 2017-11-15 2018-08-29 2017-11-15 2018-09-04 2017-11-15 2018-10-02 2017-11-15 2019-04-18 ant Selection O en gestion axée sur les rés ultats BF-PFS-17758-CS-INDV / Réal Individual Consult IDA / 54290 Project management Post Limited 8,550.00 8,489.00 Signed 2017-06-23 2017-08-07 2017-06-28 2018-05-28 2017-07-19 2018-06-26 2017-08-23 2018-07-27 2018-02-19 isation d'un site Web au profi ant Selection t du PFS BF-PFS-16926-CS-CDS / Cons Laying the foundations for a ultant principal pour le Suivi- IDA / 54290 basic national safety net syst Post Direct Selection Direct 21,000.00 16,840.66 Completed 2017-06-11 2017-06-29 2017-06-21 2017-07-13 2017-08-25 2017-08-03 2018-02-21 2017-09-15 Contrôle enquête PMT Centre em -Est BF-PFS-19405-CS-CDS / Cons ultant individuel assistant au Laying the foundations for a consultant principal pour le s IDA / 54290 basic national safety net syst Post Direct Selection Direct 13,000.00 10,396.76 Completed 2017-06-28 2017-05-02 2017-07-08 2017-05-02 2017-09-11 2017-08-03 2018-03-10 2017-09-15 uivi contrôle de l'enquête PM em T dans la région du Centre-Es t Page 9 BF-PFS-17794-CS-CDS / cons Laying the foundations for a ultant principal pour le Suivi-c IDA / 54290 basic national safety net syst Post Direct Selection Direct 20,000.00 15,794.84 Completed 2017-07-27 2017-08-10 2017-08-04 2017-08-14 2017-08-25 2017-12-30 2018-02-21 2018-03-07 ontrôle de l'enquête PMT dan em s la région du Boulkiemdé BF-PFS-22426-CS-CDS / Cons Laying the foundations for a ultant assistant chargé du sui IDA / 54290 basic national safety net syst Post Direct Selection Direct 12,500.00 10,286.70 Completed 2017-07-31 2017-06-29 2017-08-10 2017-07-13 2017-10-14 2017-08-03 2018-04-12 2017-09-15 vi contrôle de l'enquête PMT em au Boulkiemdé, Loroum et Pa ssoré BF-PFS-30015-CS-INDV / Con Laying the foundations for a Individual Consult sultant individuel pour la réali IDA / 54290 basic national safety net syst Post Limited 28,000.00 8,833.26 Completed 2017-10-06 2017-08-25 2017-10-11 2017-10-06 2017-11-01 2017-11-03 2017-12-06 2017-11-21 2018-06-04 2017-12-15 ant Selection sation de vidéo communautai em res BF-PFS-38403-CS-INDV / For mation des FACOM en ANJE ( Individual Consult IDA / 54290 Project management Post Limited 8,400.00 7,352.78 Completed 2017-12-04 2018-02-07 2017-12-09 2018-02-21 2017-12-30 2018-03-12 2018-02-03 2018-04-10 2018-08-02 2018-10-25 Est, du Centre-Est et des Prov ant Selection inces du Loroum et du Passor é) BF-PFS-38404-CS-INDV / For mation des FACOM sur DPE ( Individual Consult IDA / 54290 Project management Post Limited 4,800.00 3,503.06 Completed 2017-11-27 2018-02-07 2017-12-02 2018-02-21 2017-12-23 2018-03-12 2018-01-27 2018-03-22 2018-07-26 2018-10-18 Région Est,Centre-Est et Prov ant Selection inces Loroum et Passoré) BF-PFS-38406-CS-INDV / For mation des FACOM sur les tec Individual Consult hniques d'animation (Région IDA / 54290 Project management Post Limited 6,000.00 4,753.72 Completed 2017-12-03 2018-02-07 2017-12-08 2018-02-21 2017-12-29 2018-03-12 2018-02-02 2018-03-22 2018-08-01 2018-11-29 ant Selection de l'Est, du Centre-Est et Prov inces du Loroum et du Passor é) BF-PFS-25698-CS-CDS / Cons Cash transfers and awarenes ultant individuel pour l'appui IDA / 54290 s programs for poor and vuln Post Direct Selection Direct 3,990.00 3,342.60 Completed 2017-09-11 2017-07-28 2017-09-21 2017-07-13 2017-11-25 2017-10-16 2018-05-24 2018-07-06 au SIG dans la mise en place erable households du registre unifié BF-PFS-25753-CS-CDS / Reno Laying the foundations for a uvellement contrat du Consul IDA / 54290 basic national safety net syst Post Direct Selection Direct 21,000.00 12,841.15 Signed 2017-09-24 2017-09-04 2017-10-04 2017-09-08 2017-12-08 2017-12-20 2018-06-06 tant individuel pour la mise e em n place du SIG du PFS BF-PFS-49665-CS-INDV / Éval Individual Consult uation du processus de ciblag IDA / 54290 Project management Post Limited 12,000.00 9,760.04 Completed 2018-04-10 2017-04-01 2018-04-15 2017-04-07 2018-05-06 2017-04-19 2018-06-10 2017-05-05 2018-08-09 2017-06-12 ant Selection e dans la région du Centre-Es t BF-PFS-61897-CS-INDV / Elab oration du document cadre d Individual Consult e politiques de réinstallation IDA / 54290 Project management Post Limited 10,000.00 3,714.90 Completed 2018-05-09 2018-05-07 2018-05-14 2018-05-08 2018-06-04 2018-05-09 2018-07-09 2018-05-11 2018-08-08 2018-06-11 ant Selection des populations (CPR) dans le cadre du projet réfugié BF-PFS-61895-CS-INDV / Elab oration du cadre de gestion e Individual Consult IDA / 54290 Project management Post Limited 10,000.00 3,801.29 Signed 2018-05-07 2018-05-07 2018-05-12 2018-05-08 2018-06-02 2018-05-09 2018-07-07 2018-05-11 2018-08-06 nvironnementale et sociale d ant Selection ans le cadre du projet réfugié BF-PFS-61896-CS-INDV / Eval Individual Consult uation de la composante THI IDA / 54290 Project management Post Limited 10,000.00 3,628.34 Completed 2018-05-09 2018-05-08 2018-05-14 2018-05-07 2018-06-04 2018-05-09 2018-07-09 2018-05-09 2018-08-08 2018-05-24 ant Selection MO dans le cadre du projet ré fugié BF-PFS-61898-CS-CDS / Agen Cash transfers and awarenes ce de paiement pour les tran IDA / 54290 s programs for poor and vuln Post Direct Selection Direct 960,000.00 820,263.43 Signed 2017-04-10 2017-02-08 2017-04-20 2018-02-28 2017-06-24 2018-05-04 2018-06-24 sferts monétaires dans l'Est e erable households t le Centre-Est BF-PFS-61899-CS-INDV / Con ception (infographie) de boite Individual Consult IDA / 54290 Project management Post Limited 1,300.00 1,122.60 Completed 2018-05-18 2018-05-22 2018-05-23 2018-05-28 2018-06-13 2018-07-12 2018-07-18 2018-08-29 2018-08-02 2018-09-28 s à images sur les nouveaux t ant Selection hèmes du projet BF-PFS-68471-CS-CDS / Form ation des PRC à l'utilisation d Cash transfers and awarenes es données géo satellitaires p TF / A3975 s programs for poor and vuln Post Direct Selection Direct 35,400.00 29,486.33 Signed 2018-07-23 2018-09-25 2018-08-02 2019-05-21 2018-10-06 2019-06-25 2019-10-06 our la production et la comm erable households ercialisation des produits agr opastoraux BF-PFS-17571-CS-CDS / Agen Cash transfers and awarenes ce de paiement pour les tran IDA / 54290 s programs for poor and vuln Prior Direct Selection Direct 960,000.00 0.00 Canceled 2017-07-26 2017-07-31 2017-09-10 2018-03-09 sferts monétaires dans l'Est e erable households t le Centre-Est BF-PFS-78848-CS-INDV / App Laying the foundations for a ui accompagnement du proje Individual Consult IDA / 54290 basic national safety net syst Post Limited 20,000.00 14,208.91 Completed 2018-09-24 2018-09-21 2018-09-29 2018-09-21 2018-10-03 2018-09-27 2018-10-22 2018-10-02 2018-12-31 2018-11-09 t dans la collecte des donnée ant Selection em s au sahel (enquête de ciblag e des ménages) BF-PFS-78849-CS-INDV / App Laying the foundations for a Individual Consult ui au SIG pour la mise en plac IDA / 54290 basic national safety net syst Post Limited 24,000.00 10,197.03 Signed 2018-09-26 2018-09-26 2018-10-01 2019-05-03 2018-10-08 2019-05-20 2018-10-29 2019-06-03 2018-12-18 ant Selection e du registre social unique em BF-PFS-78847-CS-INDV / Mai Laying the foundations for a Individual Consult ntenance du SIG du projet et IDA / 54290 basic national safety net syst Post Limited 20,000.00 16,169.02 Completed 2018-09-24 2018-09-23 2018-09-29 2018-09-25 2018-10-03 2018-10-04 2018-10-22 2018-11-05 2019-01-30 2019-04-05 ant Selection assistance em BF-PFS-84196-CS-INDV / Act ualisation du document cadre Individual Consult IDA / 54290 Project management Post Limited 3,000.00 0.00 Completed 2018-11-01 2018-11-05 2018-11-04 2018-10-10 2018-11-09 2018-12-12 2018-11-26 2018-12-18 2018-12-02 2019-07-13 de politique de réinstallation ant Selection des populations (CPRP) BF-PFS-84198-CS-INDV / Act ualisation du document cadre Individual Consult IDA / 54290 Project management Post Limited 3,000.00 9,376.40 Completed 2018-11-01 2018-11-06 2018-11-04 2018-10-10 2018-11-09 2018-12-12 2018-11-26 2018-12-18 2018-12-02 2019-07-10 de gestion environnementale ant Selection et sociale (CGES) BF-PFS-88899-CS-INDV / Réal Individual Consult Under Implement isation de la rétraite stratégiq IDA / 54290 Project management Post Limited 17,000.00 0.00 2018-12-03 2018-12-05 2018-12-08 2018-12-11 2018-12-16 2019-02-19 ant Selection ation ue du personnel du projet file ts sociaux BF-PFS-53417-CS-INDV / For Individual Consult mation du personnel sur les p IDA / 54290 Project management Post Open 80,000.00 0.00 Canceled 2018-09-10 2018-10-15 2018-10-30 2018-11-28 2018-12-28 ant Selection rocédures de décaissement d e la Banque BF-PFS-56370-CS-INDV / Assi Individual Consult stance technique en gestion f IDA / 54290 Project management Post Open 20,000.00 0.00 Canceled 2018-05-25 2018-07-03 2018-07-24 2018-08-28 2019-08-28 ant Selection inancière et comptable  BF-PFS-57179-CS-INDV / Rec rutement par une agence d'u Individual Consult IDA / 54290 Project management Post Open 11,000.00 0.00 Canceled 2017-07-25 2017-09-12 2017-10-03 2017-11-07 2018-11-07 n Responsable en Passation d ant Selection es marchés au profit du proje t Filets Sociaux Page 10 BF-PFS-46536-CS-INDV / GR Individual Consult H Consultant individuel pour IDA / 54290 Project management Post Direct 10,000.00 0.00 Canceled 2017-09-30 2017-10-10 2017-10-31 2017-12-05 2018-06-03 ant Selection Assistance technique BF-PFS-106848-CS-CDS / For mation des formateurs en AC Cash transfers and awarenes V et GERME dans la cadre de TF / A3975 s programs for poor and vuln Post Direct Selection Direct 134,000.00 111,755.73 Completed 2018-07-16 2018-09-17 2018-07-26 2018-09-24 2018-09-29 2019-07-01 2019-09-29 2020-12-28 la mise en œuvre des mesure erable households s productives dans la région du Nord BF-PFS-114535-CS-INDV / Re crutement d'un consultant in Individual Consult dividuel pour l'appui à l'élabo IDA / 54290 Project management Post Limited 30,000.00 16,614.67 Completed 2019-05-15 2019-05-15 2019-05-20 2019-05-15 2019-05-30 2019-05-23 2019-06-18 2019-05-23 2019-07-18 2019-07-26 ant Selection ration d'un manuel opération nel des travaux HIMO pour le Projet Filets Sociaux BF-PFS-119889-CS-INDV / Ré vision du manuel de procédur Individual Consult IDA / 54290 Project management Post Limited 10,000.00 15,435.73 Completed 2019-07-03 2019-06-28 2019-07-08 2019-07-01 2019-07-22 2019-07-19 2019-08-10 2019-07-20 2019-08-30 2019-09-16 es de gestion administrative, ant Selection financière et comptable du pr ojet BF-PFS-119895-CS-INDV / Dé Cash transfers and awarenes veloppement des modules su Individual Consult IDA / 54290 s programs for poor and vuln Post Limited 2,200.00 0.00 Canceled 2019-07-15 2019-07-20 2019-08-03 2019-08-22 2019-09-06 r le mariage d'enfant et les Vi ant Selection erable households olences Basées sur le Genre BF-PFS-119802-CS-INDV / Co Cash transfers and awarenes Individual Consult nception du scénario et le tes IDA / 54290 s programs for poor and vuln Post Limited 8,200.00 0.00 Canceled 2019-09-02 2019-09-07 2019-09-21 2019-10-10 2019-11-09 ant Selection t de théâtre forum erable households BF-PFS-119792-CS-INDV / Ré alisation d'un film documenta Individual Consult Pending Impleme IDA / 54290 Project management Post Open 62,600.00 0.00 2019-09-02 2019-10-30 2019-11-20 2019-12-25 2020-04-23 ire de capitalisation (26 minu ant Selection ntation tes) et de 2 films thématique s (13 minutes) BF-PFS-119897-CS-CDS / Tra duction des boîtes à images Cash transfers and awarenes ANJE et DPE en langues local TF / A3975 s programs for poor and vuln Post Direct Selection Direct 17,100.00 0.00 Signed 2019-07-22 2019-11-21 2019-08-01 2020-03-17 2019-10-05 2019-12-04 es (Fulfuldé, Mooré, Tamache erable households k, Goulmanchema, Dioula, So nraï) BF-PFS-119941-CS-INDV / Ela Individual Consult boration du manuel d’opérati IDA / 54290 Project management Post Limited 7,200.00 6,011.45 Completed 2019-06-06 2019-06-10 2019-06-11 2019-06-17 2019-06-12 2019-06-26 2019-07-01 2019-07-01 2019-07-31 2019-07-31 ant Selection on de l’éducation par la radio (E PR) BF-PFS-17926-CS-INDV / Réal Individual Consult IDA / 54290 Project management Post Limited 10,000.00 0.00 Canceled 2017-11-15 2017-11-15 2017-11-15 2017-11-15 2017-11-15 isation d'un vidéographe ant Selection BF-PFS-53416-CS-INDV / For Individual Consult mation du personnel du PFS s IDA / 54290 Project management Post Open 50,000.00 0.00 Canceled 2018-04-09 2018-05-05 2018-05-10 2018-06-08 2018-07-08 ant Selection ur la gestion du temps et des priorités BF-PFS-101199-CS-INDV / Re Individual Consult lecture du manuel des opérat IDA / 54290 Project management Post Open 6,000.00 0.00 Canceled 2019-02-25 2019-03-31 2019-04-15 2019-05-20 2019-06-04 ant Selection ions du Projet Filets Sociaux BF-PFS-68466-CS-CDS / Appu i accompagnement du projet Cash transfers and awarenes en ACV et GERME dans le cad TF / A3975 s programs for poor and vuln Post Direct Selection Direct 82,600.00 0.00 Canceled 2018-07-16 2018-09-17 2018-07-26 2018-09-29 2019-09-29 re de la mise en oeuvre des erable households mesures d'accompagnement productives BF-PFS-140251-CS-INDV / As Individual Consult sistance juridique au profit du IDA / 54290 Project management Post Limited 10,000.00 0.00 Signed 2019-11-15 2020-01-23 2019-11-20 2020-03-13 2019-12-04 2020-03-16 2020-01-02 2021-01-01 ant Selection projet filets sociaux BF-PFS-140267-CS-INDV / Mi se en place d'un système d'ar Individual Consult IDA / 54290 Project management Post Limited 11,000.00 8,803.94 Signed 2019-10-20 2019-10-20 2019-10-25 2019-09-23 2019-11-04 2019-10-10 2019-11-28 2019-10-15 2020-01-12 chivage et formation du pers ant Selection onnel du projet filets sociaux BF-PFS-140268-CS-INDV / Dé Laying the foundations for a Individual Consult Under Implement veloppement et réalisation d IDA / 54290 basic national safety net syst Post Limited 20,000.00 0.00 2019-10-20 2019-10-19 2019-10-25 2019-11-04 2019-12-09 2020-01-18 ant Selection ation u module sur la gestion des p em laintes BF-PFS-140848-CS-INDV / Re Cash transfers and awarenes Individual Consult crutement de 60 formateurs TF / A3975 s programs for poor and vuln Post Limited 90,000.00 76,008.00 Signed 2019-10-18 2019-10-23 2019-10-23 2019-10-16 2019-10-28 2019-10-24 2019-11-07 2019-10-28 2019-12-22 ant Selection pour la formation en GERME erable households BF-PFS-17791-CS-INDV / Eval Laying the foundations for a Individual Consult IDA / 54290 Post Limited 12,000.00 0.00 Canceled 2017-05-30 2017-05-30 2017-05-30 2017-05-30 2017-05-30 uation processus de paiemen basic national safety net syst ant Selection t em BF-PFS-119894-CS-INDV / Ré Individual Consult IDA / 54290 Project management Post Limited 10,900.00 0.00 Canceled 2019-07-15 2019-10-04 2019-07-20 2019-07-25 2019-08-13 2019-10-12 alisation des scoreboard ant Selection BF-PFS-17557-CS-CDS / Recr Laying the foundations for a utement et déploiement d'en IDA / 54290 basic national safety net syst Post Direct Selection Direct 17,000.00 0.00 Canceled 2017-06-11 2017-06-21 2017-08-25 2018-02-21 quêteurs dans le Lorum et Pa em ssoré BF-PFS-119776-CS-INDV / Fo Cash transfers and awarenes Individual Consult rmation de Mères-leaders du IDA / 54290 s programs for poor and vuln Post Limited 2,800.00 0.00 Canceled 2019-07-15 2019-07-20 2019-08-10 2019-08-29 2019-09-13 ant Selection Sahel sur le DPE erable households BF-PFS-119666-CS-INDV / Fo Cash transfers and awarenes Individual Consult rmation de Mères-leaders du IDA / 54290 s programs for poor and vuln Post Limited 3,860.00 0.00 Canceled 2019-07-15 2019-07-20 2019-07-30 2019-08-18 2019-09-02 ant Selection Sahel à la stratégie de ANJE erable households BF-PFS-53415-CS-INDV / Eval uation des effets du cash et d Individual Consult IDA / 54290 Project management Post Open 12,000.00 0.00 Canceled 2018-04-05 2018-11-14 2018-05-01 2018-05-16 2018-06-14 2018-07-14 es mesures d'accompagneme ant Selection nt dans le nord BF-PFS-153956-CS-INDV / Co Individual Consult llecte des données sur les per IDA / 54290 Project management Post Limited 10,000.00 0.00 Signed 2020-01-27 2020-01-27 2020-01-30 2020-05-08 2020-02-14 2020-05-25 2020-03-04 2020-04-03 ant Selection sonnes déplacées internes au Burkina Faso BF-PFS-140256-CS-CDS / Ren Cash transfers and awarenes ouvellement du contrat de l'O IDA / 54290 s programs for poor and vuln Post Direct Selection Direct 365,585.00 334,165.42 Signed 2020-01-27 2020-01-23 2020-02-06 2019-10-10 2020-03-26 2020-04-28 2021-03-26 NG pour la mise en œuvre de erable households s activités de sensibilisation a u Centre Est BF-PFS-156033-CS-INDV / Éla borer un programme de renfo rcement des capacités pour l' Individual Consult Under Implement IDA / 54290 Project management Post Limited 8,880.00 0.00 2020-02-10 2020-02-19 2020-02-15 2020-02-29 2020-03-19 2020-04-18 évaluation et la gestion des ri ant Selection ation sques de violences des femm es bénéficiaires du projet Page 11 BF-PFS-159688-CS-INDV / Mi se en place d'un système de Cash transfers and awarenes Individual Consult Under Implement collecte des données dans tro IDA / 64340 s programs for poor and vuln Post Limited 34,935.00 0.00 2020-02-28 2020-04-06 2020-03-04 2020-03-25 2020-04-29 2020-07-28 ant Selection ation is nouvelles régions (Boucle d erable households u Mouhoun, Centre-Ouest et l e Centre) BF-PFS-159683-CS-INDV / Ev Cash transfers and awarenes Individual Consult aluation des effets du cash et IDA / 54290 s programs for poor and vuln Post Limited 18,000.00 0.00 Signed 2020-03-03 2020-02-28 2020-03-08 2019-08-21 2020-03-29 2020-04-08 2020-05-03 2020-10-30 ant Selection des mesures d'accompagnem erable households ent BF-PFS-159647-CS-INDV / Fo Cash transfers and awarenes Individual Consult rmation des mères-leader de IDA / 64340 s programs for poor and vuln Post Limited 11,480.00 0.00 Signed 2020-03-10 2020-06-23 2020-03-15 2020-11-16 2020-04-05 2020-12-10 2020-04-24 2020-05-24 ant Selection l'Est en fabrication de farine erable households enricihie BF-PFS-159629-CS-INDV / Ma Laying the foundations for a intenance évolutive et adapta Individual Consult IDA / 54290 basic national safety net syst Post Limited 31,500.00 0.00 Signed 2020-02-28 2020-02-28 2020-03-09 2020-04-03 2020-03-30 2020-04-17 2020-05-04 2020-10-01 tive des applications du Proje ant Selection em t et l'assistance à l'équipe SI G BF-PFS-159655-CS-INDV / Ela boration d'une stratégie de c Individual Consult IDA / 54290 Project management Post Limited 19,500.00 0.00 Canceled 2020-02-21 2020-03-03 2020-02-26 2020-03-18 2020-04-22 2020-06-21 ommunication et de capitalis ant Selection ation des accquis BF-PFS-140253-CS-CDS / Ren Cash transfers and awarenes ouvellement du contrat de l'O IDA / 54290 s programs for poor and vuln Post Direct Selection Direct 553,056.00 0.00 Signed 2020-03-02 2020-03-18 2020-03-12 2020-03-05 2020-04-21 2021-04-21 NG pour la mise en œuvre de erable households s activités de sensibilisation à l'Est BF-PFS-168964-CS-INDV / Fo rmation des acteurs terrains Productive Labor-Intensive P Individual Consult Pending Impleme et élus locaux en évaluation IDA / 64340 Post Limited 3,120.00 0.00 2020-07-01 2020-07-06 2020-07-21 2020-07-31 2020-08-12 ublic Works (LIPW) Program ant Selection ntation environnementale et sociale des sous projets et suivi envir onnemental des travaux BF-PFS-172512-CS-INDV / As sistance dans la Collecte et le Cash transfers and awarenes Individual Consult Pending Impleme traitement des données dans IDA / D4760 s programs for poor and vuln Post Limited 14,600.00 0.00 2020-05-09 2020-05-14 2020-05-17 2020-05-21 2020-07-12 ant Selection ntation le cadre des réponses au Cov erable households id19 et de l'appui au PDI BF-PFS-178608-CS-INDV / Re crutement d'un Responsable Individual Consult Under Implement IDA / D4760 Project management Post Open 21,500.00 0.00 2020-06-11 2020-06-10 2020-07-30 2020-08-20 2020-09-24 2021-09-24 en passation des marchés (R ant Selection ation PM) pour le compte du projet Filets sociaux BF-PFS-200790-CS-INDV / As sistance du projet dans la coll Cash transfers and awarenes Individual Consult Pending Impleme ecte et le traitement des don IDA / D4760 s programs for poor and vuln Post Limited 40,000.00 0.00 2020-10-26 2020-10-31 2020-11-21 2020-12-26 2021-04-18 ant Selection ntation nées des régions de la Boucle erable households du Mouhoun, du Centre-Nord et du Nord. BF-PFS-202215-CS-CDS / Mis Cash transfers and awarenes e en œuvre des activités de s IDA / D4760 s programs for poor and vuln Post Direct Selection Direct 71,600.00 0.00 Signed 2020-11-09 2020-02-03 2020-11-19 2020-11-18 2021-01-23 2021-04-23 ensibilisation au Centre Est p erable households endant trois (3) mois au titre de 2020 BF-PFS-159678-CS-INDV / Sui Laying the foundations for a vi des recommandations issu Individual Consult IDA / 54290 basic national safety net syst Post Limited 19,150.00 0.00 Canceled 2020-02-24 2020-02-29 2020-03-21 2020-04-19 2020-09-16 es du diagnostic 2019 du SIG ant Selection em et la mise en place du registr e unique BF-PFS-233764-CS-CDS / Rec rutement d'un cabinet pour le Cash transfers and awarenes ciblage complémentaire dans IDA / 64340 s programs for poor and vuln Prior Direct Selection Direct 3,200,000.00 0.00 Canceled 2021-05-07 2021-05-17 2021-07-21 2022-01-17 08 communes de la Boucle d erable households u Mouhoun dans le cadre du programme d'urgence BF-PFS-236701-CS-CDS / Rec rutement d’un cabinet pour l e ciblage des bénéficiaires du Cash transfers and awarenes Projet Filets Sociaux dans la IDA / 64340 s programs for poor and vuln Prior Direct Selection Direct 3,800,000.00 1,578,358.18 Completed 2021-05-26 2021-07-27 2021-06-05 2021-08-18 2021-08-09 2021-10-30 2022-02-05 2022-04-21 Boucle du Mouhoun et dans l erable households es quartiers spontanés des ar rondissements 7, 8 et 11 de Ouagadougou BF-PFS-236702-CS-CDS / Rec rutement d’un cabinet pour l a réalisation d’une collecte d Cash transfers and awarenes e données auprès des ménag IDA / 64340 s programs for poor and vuln Post Direct Selection Direct 350,000.00 267,749.41 Signed 2021-05-26 2021-07-22 2021-06-05 2021-07-28 2021-08-09 2021-11-24 2022-02-05 es: erable households Evaluation d'impact du projet filets sociaux – au Centre Est du Burkina Faso BF-PFS-241494-CS-INDV / Re crutement d’un consultant po Cash transfers and awarenes ur le renforcement des capaci Individual Consult Under Implement IDA / 64340 s programs for poor and vuln Post Limited 4,000.00 0.00 2021-07-05 2021-08-31 2021-07-10 2021-07-31 2021-09-04 2022-03-03 tés de l’UGP, du SP/CONASUR ant Selection ation erable households et de la DGSAH sur les norme s et principes humanitaires BF-PFS-244346-CS-INDV / Re crutement d’un consultant po Cash transfers and awarenes ur la conception du site web Individual Consult IDA / 64340 s programs for poor and vuln Post Limited 10,000.00 0.00 Signed 2021-07-28 2021-07-26 2021-08-02 2021-10-19 2021-08-23 2021-11-22 2021-09-27 2022-03-26 du ministère de la femme, de ant Selection erable households la solidarité nationale, de la f amille et de l’action humanita ire et du Projet Filets Sociaux BF-PFS-275620-CS-CDS / Sél ection d’un cabinet de recrut Under Implement IDA / 64340 Project management Post Direct Selection Direct 20,000.00 0.00 2022-02-04 2020-05-21 2022-02-14 2022-04-20 2022-10-17 ement du personnel au profit ation du Projet Filets Sociaux BF-PFS-275629-CS-INDV / Re crutement d’un consultant po ur l’assistance technique à la Individual Consult Pending Impleme maintenance évolutive et ada IDA / 64340 Project management Post Limited 18,600.00 0.00 2022-02-04 2022-02-09 2022-03-02 2022-04-06 2022-10-03 ant Selection ntation ptative de l’application MIS et des applications mobiles de l ’unité de gestion du Projet Fil ets Sociaux. BF-PFS-275630-CS-INDV / Re crutement d’un consultant po ur l’élaboration de la stratégi Individual Consult Pending Impleme e de communication du minis IDA / 64340 Project management Post Limited 18,000.00 0.00 2022-02-11 2022-02-16 2022-03-09 2022-04-13 2022-10-10 ant Selection ntation tère du genre, de la solidarité nationale, de la famille et de l ’action humanitaire et du Proj et Filets Sociaux BF-PFS-293363-CS-INDV / Re crutement d’un consultant po Cash transfers and awarenes Individual Consult ur le renforcement des capaci IDA / 64340 s programs for poor and vuln Post Limited 19,600.00 0.00 Signed 2022-05-13 2022-07-29 2022-05-18 2022-04-05 2022-06-08 2022-06-08 2022-07-13 2023-01-09 ant Selection tés de l’UGP sur l’accès huma erable households nitaire, la sécurité, la sureté et la redevabilité Page 12 BF-PFS-302217-CS-INDV / Re crutement de trois (03) consu ltants individuels pour la trad Cash transfers and awarenes Individual Consult uction des outils de dissémin IDA / 64340 s programs for poor and vuln Post Limited 4,710.00 0.00 Signed 2022-07-08 2022-09-12 2022-07-13 2022-10-20 2022-08-03 2022-10-20 2022-09-07 2023-03-06 ant Selection ation du mécanisme de gesti erable households on des plaintes (MGP) du proj et filets sociaux en langues n ationales Moore, Dioula et Ful fudé. BF-PFS-307644-CS-CDS / Ren ouvellement du contrat de l’O Cash transfers and awarenes NG AGED pour la mise en œu IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 500,000.00 0.00 Signed 2022-08-08 2022-08-22 2022-08-18 2022-10-20 2022-10-22 2023-04-20 vre des activités du Projet Fil erable households ets dans la région du Sahel BF-PFS-316326-CS-CDS / Rec rutement cabinet de consulta Cash transfers and awarenes nce en sécurité pour l’évaluat Direct - Internation IDA / 64340 s programs for poor and vuln Post Direct Selection 26,107.00 0.00 Signed 2022-09-16 2022-10-17 2022-09-24 2022-10-19 2022-10-07 2022-10-23 ion des risques dans la région al erable households du Centre-Nord et de la Boucl e du Mouhoun au profit du pr ojet filets sociaux BF-PFS-334522-CS-INDV / Re crutement d’un consultant in dividuel pour l’élaboration du Cash transfers and awarenes Plan d’Engagement Environn Individual Consult IDA / 64340 s programs for poor and vuln Post Limited 20,000.00 0.00 Signed 2023-01-04 2023-01-04 2023-01-09 2023-02-15 2023-01-27 2023-02-15 2023-02-08 2023-03-10 ementale et Social (PEES), du ant Selection erable households Plan de Mobilisation des Parti es Prenantes (PMPP) et des Pr océdures de Gestion de la Ma in d’œuvre (PGMO) du PAPSA BF-PFS-334551-CS-INDV / Re crutement d’un consultant in dividuel en vue de l’Evaluatio Cash transfers and awarenes Individual Consult n du Risque Sécuritaire et l’él IDA / 64340 s programs for poor and vuln Post Limited 20,000.00 0.00 Signed 2023-01-04 2023-01-04 2023-01-09 2023-02-06 2023-01-27 2022-02-10 2023-02-08 2023-03-10 ant Selection aboration d’un Plan de Gestio erable households n Sécuritaire pour un futur pr ojet d’appui à la protection so ciale adaptative BF-PFS-334562-CS-INDV / Re crutement d’un consultant in Cash transfers and awarenes Individual Consult dividuel en charge de l’évalu IDA / 64340 s programs for poor and vuln Post Limited 20,000.00 0.00 Signed 2023-01-09 2023-01-17 2023-01-14 2022-01-12 2023-02-01 2023-01-18 2023-02-13 2023-04-14 ant Selection ation sociale du Projet d’Appu erable households i à la Protection sociale Adapt ative BF-PFS-334563-CS-INDV / Re crutement d’un consultant in dividuel pour l’élaboration d’ Cash transfers and awarenes un Plan de Gestion Environne Individual Consult IDA / 64340 s programs for poor and vuln Post Limited 20,000.00 0.00 Signed 2023-01-09 2023-01-19 2023-01-14 2023-01-30 2023-02-01 2023-02-13 2023-02-13 2023-03-15 mentale et Sociale (PGES) gé ant Selection erable households nérique incluant un plan de g estion des déchets électroniq ues pour un futur Projet d’Ap pui à la Protection Sociale Ad aptative BF-PFS-339632-CS-CDS / Sél ection de l’Association Songui Manegre /Aide au Développe Laying the foundations for a ment Endogène (ASMADE) po IDA / 64340 basic national safety net syst Post Direct Selection Direct - National 331,175.00 0.00 Signed 2023-02-01 2023-01-16 2023-02-11 2023-01-31 2023-03-12 2023-04-02 ur les activités de ciblage co em mmunautaire dans la région du centre-ouest dans le cadre de l'opérationnalisation du Re gistre social unique (RSU). BF-PFS-339684-CS-CDS / Sél ection de l’Association Jeunes se Volontaire pour la Promoti on du Leadership la Santé et l Laying the foundations for a e Développement (AJVLS) po IDA / 64340 basic national safety net syst Post Direct Selection Direct - National 277,002.00 0.00 Signed 2023-02-01 2023-01-16 2023-02-11 2023-01-31 2023-03-12 2023-04-02 ur les activités de ciblage co em mmunautaire dans la région du centre-est dans le cadre d e l'opérationnalisation du Reg istre social unique BF-PFS-346996-CS-CDS / Rec rutement de l’Institut Nationa l de la Statistique et de la Dé Laying the foundations for a mographie (INSD) la conduite IDA / 64340 basic national safety net syst Post Direct Selection Direct - National 1,464,000.00 0.00 Canceled 2023-03-03 2023-03-15 2023-03-13 2023-03-23 2023-04-11 2023-05-11 de la collecte de données des em ménages et personnes pauvr es et vulnérables de la région du Centre-Ouest BF-PFS-346992-CS-CDS / Rec rutement de l’Institut Supérie ur des Sciences de la Populati Laying the foundations for a on (ISSP) pour la conduite de IDA / 64340 basic national safety net syst Post Direct Selection Direct - National 1,061,280.00 0.00 Canceled 2023-03-03 2023-03-15 2023-03-13 2023-03-23 2023-04-11 2023-05-02 la collecte de données des m em énages et personnes pauvres et vulnérables de la région du Centre Est BF-PFS-353775-CS-CDS / Rec rutement de l’Institut Nationa l de la Statistique et de la Dé Laying the foundations for a Under Implement mographie (INSD) la conduite IDA / 64340 basic national safety net syst Prior Direct Selection Direct - National 1,464,000.00 0.00 2023-03-29 2023-03-30 2023-04-08 2023-03-30 2023-05-07 2023-06-06 ation de la collecte de données des em ménages et personnes pauvr es et vulnérables de la région du Centre-Ouest BF-PFS-353801-CS-CDS / Rec rutement de l’Institut Supérie ur des Sciences de la Populati Laying the foundations for a Under Implement on (ISSP) pour la conduite de IDA / 64340 basic national safety net syst Prior Direct Selection Direct - National 1,061,280.00 0.00 2023-03-29 2023-03-30 2023-04-08 2023-03-30 2023-05-07 2023-06-06 ation la collecte de données des m em énages et personnes pauvres et vulnérables de la région du Centre Est BF-PFS-355234-CS-CDS / Ren ouvellement du contrat de l'O Cash transfers and awarenes Pending Impleme NG en charge de la mise en IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 57,057.00 0.00 2023-04-18 2023-04-28 2023-07-02 2023-07-20 ntation œuvre des activités du Projet erable households Filets Sociaux dans la région du Sahel BF-PFS-355327-CS-INDV / Re crutement d'un consultant po Individual Consult Pending Impleme ur la formation du personnel IDA / 54290 Project management Post Limited 16,800.00 0.00 2023-04-10 2023-04-23 2023-04-26 2023-05-02 2023-05-12 ant Selection ntation des ONGS sur la sécurité, la s ûreté et l'acces humanitaire BF-PFS-355333-CS-INDV / Re crutement d'un consultant po Individual Consult Pending Impleme ur la maintenance évolutive IDA / 64340 Project management Post Limited 4,500.00 0.00 2023-05-02 2023-05-07 2023-05-28 2023-07-02 2023-08-16 ant Selection ntation et adaptative de l'application MIS et des applications mobil es BF-PFS-355338-CS-INDV / Fo rmation du personnel du ST/R Individual Consult Pending Impleme IDA / 64340 Project management Post Limited 9,000.00 0.00 2023-04-26 2023-05-01 2023-05-22 2023-06-26 2023-07-01 SU et autres acteurs sur les f ant Selection ntation ondamentaux du Registre soc ial unique Page 13 BF-PFS-355340-CS-INDV / Fo rmation des managers du sys Individual Consult Pending Impleme tème informatique et de gesti IDA / 64340 Project management Post Limited 5,000.00 0.00 2023-04-12 2023-04-17 2023-05-08 2023-06-12 2023-06-17 ant Selection ntation on sur la conception et la ges tion de la base de données d u RSU BF-PFS-355342-CS-INDV / Fo rmation du personnel du ST/R Individual Consult Pending Impleme IDA / 64340 Project management Post Limited 3,000.00 0.00 2023-05-01 2023-05-06 2023-05-27 2023-07-01 2023-07-06 SU sur le système d'informati ant Selection ntation on géographique BF-PFS-355343-CS-INDV / Fo rmation du personnel du ST R SU et autres acteurs sur les Individual Consult Pending Impleme IDA / 64340 Project management Post Limited 3,000.00 0.00 2023-05-18 2023-05-23 2023-06-13 2023-07-18 2023-07-23 mesures de sécurisation des ant Selection ntation systèmes informatiques et la protection des données à car actère personnel BF-PFS-355344-CS-INDV / Fo rmation du personnel du ST R Individual Consult Pending Impleme IDA / 64340 Project management Post Limited 3,000.00 0.00 2023-05-11 2023-05-16 2023-06-06 2023-07-11 2023-07-16 SU et autres acteurs sur ll'an ant Selection ntation alyse de la pauvreté multidim ensionnelle BF-PFS-355356-CS-INDV / Et Individual Consult Pending Impleme ude pour la capitalisation et a IDA / 64340 Project management Post Limited 20,000.00 0.00 2023-09-30 2023-10-05 2023-10-26 2023-11-30 2023-12-30 ant Selection ntation pprentissage BF-PFS-355253-CS-CDS / Ren ouvellement du contrat du G ROUPEMENT ASSOCIATION D’ AIDE AUX ENFANTS ET AUX F Cash transfers and awarenes Pending Impleme AMILLES DEMUNIES (ADEFAD IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 491,775.00 0.00 2023-04-24 2023-04-28 2023-06-25 2024-01-21 ntation )/ASSOCIATION SINIGNANSSI erable households GUI en charge en charge de l a mise en œuvre des activité s dans les nouvelles zones d'i ntervention du PFS (Boucle d u Mouhoun) BF-PFS-355255-CS-CDS / Ren ouvellement du contrat de l'O Cash transfers and awarenes NG ASD en charge de la mise Pending Impleme IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 583,149.00 0.00 2023-04-24 2023-04-28 2023-06-25 2024-01-21 en œuvre des activités dans l ntation erable households es nouvelles zones d'interven tion du PFS (Centre Nord) BF-PFS-355355-CS-CDS / Ren ouvellement du contrat de EV AL + pour la réalisation de Ph Cash transfers and awarenes one Call ou Appels téléphoniq Under Implement IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 36,191.00 0.00 2023-04-24 2021-10-29 2023-05-04 2023-07-08 2023-12-05 ues dans le cadre du suivi de ation erable households s transferts monétaires dans l es régions du Nord et du Sah el au profit du Projet Filets So ciaux. BF-PFS-355353-CS-CDS / Ren ouvellement du contrat de "I MCG" pour la réalisation de P Cash transfers and awarenes ost Distribution Monitoring (P Under Implement IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 159,167.00 0.00 2023-04-24 2021-11-30 2023-05-04 2023-07-08 2023-10-06 DM) ou enquêtes post paiem ation erable households ent des cash transferts dans l es régions de la Boucle du Mo uhoun et du Centre au profit du Projet Filets Sociaux. BF-PFS-355252-CS-CDS / Ren ouvellement du contrat de l'O Cash transfers and awarenes Pending Impleme NG ADEFAD en charge de la IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 297,238.00 0.00 2023-04-24 2023-04-28 2023-06-25 2023-12-22 ntation mise en œuvre des activités erable households dans les nouvelles zones d'int ervention du PFS (Nord) BF-PFS-358257-CS-CDS / Ren ouvellement de contrat de "I NNOVATIVE HUB FOR RESEAR Cash transfers and awarenes CH IN AFRICA Sarl" pour la ré Pending Impleme IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 166,615.00 0.00 2023-04-24 2023-05-04 2023-07-08 2023-10-06 alisation de Post Distribution ntation erable households Monitoring (PDM) ou enquête s post paiement des cash tra nsferts dans la région du Cen tre Nord au profit du Projet Fil ets Sociaux. BF-PFS-358258-CS-CDS / Ren ouvellement du contrat de "C ENTRE D’ETUDE EN DEVELOP PEMENT (CED) Sarl" pour la r Cash transfers and awarenes Pending Impleme éalisation de Post Distribution IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 144,763.00 0.00 2023-04-24 2023-05-04 2023-07-08 2023-10-06 ntation Monitoring (PDM) ou enquête erable households s post paiement des cash tra nsferts dans les régions du N ord et du Sahel au profit du P rojet Filets Sociaux. BF-PFS-358259-CS-CDS / Ren ouvellement du contrat de IN NOVATIVE HUB FOR RESEARC Cash transfers and awarenes H IN AFRICA Sarl pour la réali Pending Impleme IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 41,654.00 0.00 2023-04-24 2023-05-04 2023-07-08 2023-12-05 sation de Phone Call ou Appel ntation erable households s téléphoniques dans le cadre du suivi des transferts monét aires dans la région du Centr e Nord au profit du Projet File ts Sociaux. BF-PFS-358260-CS-CDS / Ren ouvellement du contrat de H ORUS CD pour réalisation de Cash transfers and awarenes Phone Call ou Appels télépho Pending Impleme IDA / 64340 s programs for poor and vuln Post Direct Selection Direct - National 39,792.00 0.00 2023-04-24 2023-05-04 2023-07-08 2023-12-05 niques dans le cadre du suivi ntation erable households des transferts monétaires da ns les régions de la Boucle du Mouhoun et du Centre au pro fit du Projet Filets Sociaux. Page 14 PROCUREMENT PLAN (Textual Part) Project information: Hashemite Kingdom of Jordan Exploring High Value, Social Inclusive Agriculture Project P 170476 Project Implementation agency: Ministry of Agriculture Date of the Procurement Plan: [Jan. 27th 2021] Period covered by this Procurement Plan: project period 1. Middle East and North Africa (MNA) Region-wide Technical Assistance Multi-Donor Trust Fund MDTF Grant No.TF0B2638 Exploring High-Value, Socially Inclusive, and Water-Efficient Agriculture Letter Agreement closing date June 30,2021 2. Multi Donor Trust Fund for Forced Displacement Grant No. TF0B2626 Exploring High-Value, Socially Inclusive, and Water-Efficient Agriculture Letter Agreement closing date April 30, 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [National Procurement bylaw No 28 for 2019 and its Regulations, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). NA Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. NA Other Relevant Procurement Information. NA PROCUREMENT Jordan : Exploring High-Value, Socially Inclusive and Water-Efficient Agriculture PLAN General Information Country: Jordan 2021-02-08 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170476 GPN Date: Project Name: Exploring High-Value, Socially Inclusive and Water-Efficient Agriculture Loan / Credit No: TF / B2626, TF / B2638 Ministry of Agriculture Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C1-G2 / Procurement of Gree Procurement and Operation Single Stage - One E nhouse and operations of on TF / B2638 of Demonstration Hydroponi Post Request for Bids Open - National 400,000.00 0.00 Signed 2021-02-15 2021-03-10 2021-02-20 2021-03-13 2021-05-02 2021-03-23 2021-05-02 2021-04-27 2021-07-26 nvelope e hydroponic production unit c Units Al-Tafilah C1-G1 / Procurement of Gree Procurement and Operation Single Stage - One E nhouse and operations of on TF / B2626 of Demonstration Hydroponi Post Request for Bids Open - National 400,000.00 0.00 Signed 2022-03-23 2021-03-09 2022-03-28 2022-05-29 2022-04-27 2022-08-18 2022-05-27 2022-08-23 2022-09-08 2023-01-06 nvelope e hydroponic production unit c Units in AlKarak JO-MOA-365576-GO-RFB / Pr Procurement and Operation ocurement of Solar Panels Sy Single Stage - One E Pending Impl TF / B2626 of Demonstration Hydroponi Post Request for Bids Open - National 150,000.00 0.00 2023-06-29 2023-07-04 2023-08-15 2023-09-14 2023-10-19 2024-04-16 stem, and operations of Solar nvelope ementation c Units Panels System for Tafileh an d Karak JO-MOA-365588-GO-RFB / Pr Procurement and Operation Request for Quota Single Stage - One E Pending Impl ocurement of Transport Vehi TF / B2626 of Demonstration Hydroponi Post Limited 60,000.00 0.00 2023-10-02 2023-11-27 2024-01-26 tions nvelope ementation cles for Tafileh and Al Karak c Units JO-MOA-365592-GO-RFQ / Pr Procurement and Operation Request for Quota Single Stage - One E Pending Impl ocurement of Transport cooli TF / B2626 of Demonstration Hydroponi Post Limited 75,000.00 0.00 2023-11-04 2023-12-30 2024-03-29 tions nvelope ementation ng truck for Karak and Al Ta c Units fileh JO-MOA-365589-GO-RFQ / Pr Procurement and Operation Request for Quota Single Stage - One E Pending Impl ocurement of nursery and cr TF / B2626 of Demonstration Hydroponi Post Limited 31,000.00 0.00 2023-07-03 2023-08-28 2023-09-27 tions nvelope ementation op seeds for Tafileh and Kara c Units k NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Project Management and Mo Least Cost Selecti Under Implement C2-CS2 / External auditor TF / B2626 Post Open - National 10,000.00 0.00 2021-06-08 2021-10-13 2021-06-29 2021-08-12 2017-12-11 2021-09-09 2021-11-29 2021-10-09 2021-12-02 2021-11-13 2021-12-02 2021-12-18 2022-02-16 nitoring on ation INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual C2-CS1 / Part-time accounta Project Management and Mo Individual Consult TF / B2626 Post Limited 4,000.00 0.00 Signed 2021-02-15 2021-05-17 2021-02-20 2021-04-28 2021-03-13 2021-05-30 2021-04-17 2021-10-14 nt nitoring ant Selection C1-CS3 / Trainer of theoretic Procurement and Operation Individual Consult al training (course +develop TF / B2638 of Demonstration Hydroponi Post Limited 9,000.00 0.00 Canceled 2021-02-15 2021-02-20 2021-03-13 2021-04-17 2021-04-23 ant Selection manual ) one for each locatio c Units n C1-CS4 / Trainer of theoretic Procurement and Operation Individual Consult al training (course +develop TF / B2626 of Demonstration Hydroponi Post Limited 9,000.00 0.00 Canceled 2021-06-08 2021-06-13 2021-07-04 2021-08-08 2021-10-07 ant Selection manual ) one for each locatio c Units n C1-CS5 / trainers for practic Procurement and Operation Individual Consult TF / B2626 Post Limited 4,500.00 0.00 Canceled 2021-02-28 2021-02-25 2021-03-05 2021-03-26 2021-04-30 2021-05-30 al training /one for Tafilah loc of Demonstration Hydroponi ant Selection ation c Units C1-CS6 / trainers for practic Procurement and Operation Individual Consult TF / B2626 Post Limited 4,500.00 0.00 Canceled 2021-04-12 2021-04-17 2021-06-01 2021-07-22 2021-08-21 al training /one for Ajloun loc of Demonstration Hydroponi ant Selection ation c Units JO-MOA-247821-CS-INDV / Tr Procurement and Operation ainer of Practiccal& theoretic Individual Consult TF / B2626 of Demonstration Hydroponi Post Open 14,000.00 0.00 Canceled 2021-08-12 2021-07-01 2021-08-25 2021-08-19 2021-09-09 2021-10-14 2022-04-12 al training (course +develop ant Selection c Units manual ) for Al-Tafilah JO-MOA-247824-CS-INDV / Tr Procurement and Operation ainer of Practiccal& theoretic Individual Consult TF / B2626 of Demonstration Hydroponi Post Open 14,000.00 0.00 Canceled 2021-12-05 2021-12-02 2022-01-23 2022-02-13 2022-03-20 2022-09-16 al training (course +develop ant Selection c Units manual ) for Al-Karak JO-MOA-362861-CS-CDS / Tr ainer of Practiccal& theoretic Project Management and Mo TF / B2626 Post Direct Selection Direct - National 12,000.00 0.00 Canceled 2023-05-30 2023-06-09 2023-08-13 2023-10-22 al training (course +develop nitoring manual ) for Al-Tafilah Page 1 JO-MOA-363364-CS-CDS / Tr ainer of Practical& theoretica Project Management and Mo Pending Impleme TF / B2626 Post Direct Selection Direct - National 5,000.00 0.00 2023-06-07 2023-06-17 2023-08-21 2023-10-30 l training (course +develop nitoring ntation manual ) for Al karak Page 2 PLAN DE PASSATION DE MARCHÉS (Texte) Information sur le Projet : [Nom du pays] [Nom du Projet] [No d’identification du projet] Agence d’exécution du Projet : [Insérer le nom officiel de l’Agence] Date du plan de passation des marchés : [Insérer la date] Période couverte par ce plan de passation des marchés : [Insérer date de début, date de fin] Préambule Conformément au paragraphe 5.9 du “Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (FPI)” (Juillet 2016) (“Règlement de Passation des Marchés”) le Système électronique de la Banque de suivi systématique des transactions de marchés publics (STEP) sera utilisé pour préparer, valider et actualiser les plans de passation des marchés et effectuer toutes les transactions liées à la passation des marchés du projet. Ce texte ainsi que les tableaux du plan de passation des marchés présents dans STEP constituent le plan de passation des marchés du projet. Les conditions suivantes s'appliquent à toutes les activités de passation de marchés du plan de passation de marchés. Les autres éléments du plan de passation des marchés tels que requis au paragraphe 4.4 du Règlement de passation des marchés sont énoncés dans STEP. Les Dossiers types de passation des marchés publics de la Banque devront être utilisés pour tous les contrats soumis à la concurrence internationale, ainsi que pour tous les autres contrats soumis à cette obligation telle que spécifiée dans les tableaux du plan de passation des marchés de STEP. Procédures nationales de passation des marchés : En accord avec le paragraphe 5.3 du Règlement de passation des marchés, dans le cas où la procédure de passation des marché se fera au niveau national (telle que spécifiée dans les tableaux du plan de passation des marchés inclus de STEP), les procédures nationales de passation des marchés du pays considéré pourront être utilisées. Si l’Emprunteur utilise ses propres procédures d’appel d’offres national ouvert telles qu’énoncées [Insérer la référence exacte de la législation nationale], ces arrangements sont soumis aux dispositions du paragraphe 5.4 du Règlement de passation des marchés et aux conditions suivantes : Indiquer la liste des conditions requises pour assurer la cohérence avec le paragraphe 5.4 du Règlement de passation des marchés. Si aucune condition s’applique, supprimer la mention « et aux conditions suivantes ». Lorsque l’Emprunteur utilise d’autres procédures que l’appel d’offres national ouvert, ces procédures devront être en accord avec les dispositions du paragraphe 5.5 du Règlement de passation des marchés. Crédit-bail tel que spécifié au paragraphe 5.10 du Règlement de Passation des marchés : Le crédit-bail peut être utilisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. Sinon indiquer « Sans objet » Achat de biens d’occasion tel que spécifié au paragraphe 5.11 du Règlement de Passation des Marchés est autorisé pour les contrats indiqués comme tel dans le Plan de passation des marchés. Sinon indiquer « Sans objet » Préférence nationale telle que spécifiée au paragraphe 5.51 du Règlement de Passation des Marchés (Fournitures et Travaux). Fournitures : [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] Travaux [ne s’applique pas/s’applique pour les contrats indiqués dans les tableaux du Plan de passation des marchés] L’Assistance directe à la mise en œuvre (sigle HEIS en anglais) tel que précisée aux paragraphes 3.10 et 3.11 du Règlement de Passation des marchés s’applique. [Inclure cette mention seulement si la Banque a formellement acceptée de fournir cette assistance directe à l’Emprunteur. Sinon, supprimer cette phrase.] Autres informations pertinentes sur la passation des marchés Indiquer toute autre information pertinente relative aux procédures de passation, telle que par exemple l’utilisation de procédures de participation communautaire au développement (CDD), de l’utilisation de procédures pour un besoin urgent d’assistance ou de faible capacité, etc. PROCUREMENT Western and Central Africa : Regional Electricity Access and BEST Project PLAN General Information Country: Western and Central Africa 2021-06-30 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167569 GPN Date: 2021-05-17 Project Name: Regional Electricity Access and BEST Project Loan / Credit No: IDA / D8270, IDA / 68940, IDA / 68860, IDA / 68950 ECOWAS - Directorate for Energy and Mines Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned NG-ECOWAS-DEM-303819-C W-RFP / Recruitment of the C Design, supply, and installati Request for Propo Open - Internationa Single Stage - Two E Other (with field f 131,000,000. 2025-12-0 ontractor for the Design, Sup IDA / 68860 Prior 0.00 Canceled 2022-07-22 2022-08-01 2022-09-30 2022-12-23 on of BEST equipment sals l nvelope or explanation) 00 7 ply and Installation (DSI) for Component 2 - Battery Energ y Storage Technology - BEST NG-ECOWAS-DEM-305294-C W-RFB / Recruitment of the C Request for Bids - ontractor for Component 2 - Design, supply, and installati Open - Internationa Single Stage - One E Works (without pr 131,000,000. Under Imple 2024-08-0 IDA / 68860 Prior Request for Bids 0.00 2022-07-28 2022-09-05 2022-07-30 2022-09-07 2022-09-28 2022-11-21 2022-10-13 2023-05-27 2022-11-17 Battery Energy Storage Tech on of BEST equipment l nvelope equalification) SP 00 mentation 8 nology of the Regional Electri D city Access and Battery Ener gy Storage Technology Proje ct. NG-ECOWAS-DEM-315397-C Design, supply, and installati Request for Bids - W-RFB / Recruitment of the D Open - Internationa Single Stage - One E 122,000,000. Under Revie 2024-08-1 IDA / 68950 on of electricity distribution i Prior Request for Bids Plant SPD (withou 0.00 2022-10-15 2023-02-06 2022-10-20 2023-02-07 2022-12-04 2023-04-03 2023-01-20 2023-02-24 esign, Supply and Installation l nvelope 00 w 7 nfrastructure t prequalification) Contractor for Senegal NG-ECOWAS-DEM-315386-C W-RFB / Recruitment of the D Design, supply, and installati Request for Bids - Open - Internationa Single Stage - One E 164,000,000. Under Imple 2024-08-3 esign, Supply and Installation IDA / 68940 on of electricity distribution i Prior Request for Bids Plant SPD (withou 0.00 2022-10-15 2023-01-09 2022-10-22 2023-01-11 2022-12-06 2023-03-20 2023-02-02 2023-03-09 l nvelope 00 mentation 0 Contractor of electricity distri nfrastructure t prequalification) bution infrastructure for Mau ritania and Niger GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-ECOWAS-DEM-235036-C Project coordination and tec Consultant Qualifi Under Implement S-CQS / Recruitment of the Pr IDA / D8270 Post Limited 100,000.00 0.00 2021-06-29 2021-09-08 2021-08-17 2021-08-17 2021-09-07 2024-08-22 hnical assistance cation Selection ation oject External Auditor NG-ECOWAS-DEM-235253-C S-QCBS / Recruitment of an Owers' Engineers for the BES Supervision of the constructi Quality And Cost- Open - Internationa Under Implement IDA / 68940 Prior 7,150,000.00 0.00 2021-07-12 2021-08-13 2021-08-10 2021-10-14 2021-10-27 2022-07-27 2021-12-29 2022-09-14 2022-02-14 2022-11-21 2022-03-06 2023-05-17 2022-04-10 2025-03-25 T Project - Component 1: Des on and technical advisory Based Selection l ation ign, supply, and installation o f electricity distribution infras tructure NG-ECOWAS-DEM-242641-C S-QCBS / Recruitment of an Owers' Engineers for the BES Supervision of the constructi Quality And Cost- Open - Internationa Under Implement IDA / 68940 Prior 3,275,000.00 0.00 2021-07-12 2021-08-13 2021-08-10 2021-09-24 2021-10-27 2022-05-18 2021-12-29 2022-07-05 2022-02-14 2023-02-07 2022-03-06 2023-03-28 2022-04-10 2025-03-25 T Project - Component 2: Des on and technical advisory Based Selection l ation ign, supply, and installation o f the Battery Energy Storage Technology INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NG-ECOWAS-DEM-235226-C Project coordination and tec Individual Consult S-INDV / Recruitment of Gen IDA / D8270 Post Open 90,000.00 168,000.00 Signed 2021-06-29 2021-07-30 2021-08-18 2021-10-27 2021-08-24 2021-11-16 2021-09-22 2022-02-11 2023-09-12 hnical assistance ant Selection der Based Violence Consulta nt NG-ECOWAS-DEM-235236-C Project coordination and tec Individual Consult S-INDV / Recruitment of Proc IDA / D8270 Post Open 120,000.00 0.00 Canceled 2021-06-29 2021-08-07 2021-08-07 2021-08-10 2021-08-22 2023-08-12 hnical assistance ant Selection urement Assistant NG-ECOWAS-DEM-249753-C Project coordination and tec Individual Consult S-INDV / Recrutment of Procu IDA / D8270 Post Open 120,000.00 0.00 Canceled 2021-08-27 2021-09-08 2021-09-25 2021-09-30 2021-10-15 2023-10-05 hnical assistance ant Selection rement Assistant NG-ECOWAS-DEM-268188-C Project coordination and tec Individual Consult Under Implement S-INDV / Recruitment of Junio IDA / D8270 Post Open 84,000.00 0.00 2021-12-20 2022-02-02 2022-01-18 2022-01-28 2022-02-28 2024-12-31 hnical assistance ant Selection ation r Economist for ERERA NG-ECOWAS-DEM-268192-C Project coordination and tec Individual Consult Under Implement S-INDV / Recruitment of a Jun IDA / D8270 Post Open 84,000.00 0.00 2021-12-21 2022-02-02 2022-01-19 2022-01-29 2022-03-01 2025-01-01 hnical assistance ant Selection ation ior Renewable Energy Expert for ERERA Page 1 NG-ECOWAS-DEM-268193-C Project coordination and tec Individual Consult Under Implement S-INDV / Recruitment of a Jun IDA / D8270 Post Open 84,000.00 0.00 2021-12-20 2022-02-02 2022-01-18 2022-01-28 2022-02-28 2024-12-31 hnical assistance ant Selection ation ior Legal Expert -Enforcemen t & Monitoring NG-ECOWAS-DEM-268195-C Project coordination and tec Individual Consult Under Implement S-INDV / Recruitment of an E IDA / D8270 Post Open 84,000.00 0.00 2021-12-27 2022-02-02 2022-01-25 2022-02-04 2022-03-07 2025-01-07 hnical assistance ant Selection ation xternal Affairs Analyst for ER ERA NG-ECOWAS-DEM-272882-C Project coordination and tec Individual Consult Under Implement S-INDV / Recruitment of a Pro IDA / D8270 Post Open 60,000.00 0.00 2022-01-20 2022-03-28 2022-02-18 2022-02-28 2022-03-31 2027-03-31 hnical assistance ant Selection ation fessional Junior Electrician En gineer NG-ECOWAS-DEM-293626-C Project coordination and tec Individual Consult Under Implement S-INDV / Recruitment of Proc IDA / D8270 Post Limited 120,000.00 0.00 2022-05-06 2022-05-16 2022-05-11 2022-05-21 2022-06-05 2024-05-25 hnical assistance ant Selection ation urement Assistant for the RC U NG-ECOWAS-DEM-304031-C S-INDV / Recruitment of an In dependent Probity Assurance Provider to ensure contracts' Project coordination and tec Individual Consult Open - Internationa IDA / D8270 Post 30,000.00 0.00 Canceled 2022-07-25 2022-07-26 2022-08-23 2022-09-02 2022-09-22 2025-09-06 negotiation processes. hnical assistance ant Selection l He will be recruited for aroun d 30 working days over a per iod of 3 years. NG-ECOWAS-DEM-304038-C Project coordination and tec Individual Consult Under Implement S-INDV / Junior Professional 2 IDA / D8270 Post Limited 36,000.00 0.00 2022-07-29 2022-07-15 2022-08-03 2022-08-16 2022-08-13 2022-09-02 2027-08-07 hnical assistance ant Selection ation in Electricity Sector NG-ECOWAS-DEM-305972-C S-INDV / Recruitment of an El Project coordination and tec Individual Consult Under Implement ectrician Engineer Expert in IDA / D8270 Post Limited 20,000.00 0.00 2022-07-28 2022-09-07 2022-08-02 2022-08-12 2022-08-23 2023-08-18 hnical assistance ant Selection ation Battery Energy Storage Tech nology to assist the RCU NG-ECOWAS-DEM-311951-C Project coordination and tec Individual Consult Open - Internationa Under Implement S-INDV / Recruitment of Pow IDA / D8270 Post 96,000.00 0.00 2022-08-31 2022-09-07 2022-09-22 2022-10-02 2022-11-02 2025-10-17 hnical assistance ant Selection l ation er Engineer for RCU NG-ECOWAS-DEM-346725-C S-INDV / Recruitment of an ar Project coordination and tec Individual Consult Open - Internationa Pending Impleme chitect to assist ERERA in org IDA / D8270 Post 70,000.00 0.00 2023-05-17 2023-06-22 2023-07-13 2023-08-13 2023-11-21 hnical assistance ant Selection l ntation anizing an architectural com petition for the construction of ERERA's headquarters NG-ECOWAS-DEM-347359-C S-INDV / Recruitment of a Se nior Power Engineer, speciali Project coordination and tec Individual Consult Open - Internationa Pending Impleme IDA / D8270 Post 184,800.00 0.00 2023-05-09 2023-06-07 2023-06-17 2023-07-18 2024-07-12 st in Battery Energy Storage hnical assistance ant Selection l ntation Technology, for the support o f the RCU during the project i mplementation. NG-ECOWAS-DEM-236904-C S-INDV / Recruitment of a Co Project coordination and tec Individual Consult nsultant for Harmonization of IDA / D8270 Post Open 150,000.00 0.00 Canceled 2021-07-16 2021-11-03 2021-08-11 2021-08-21 2021-09-16 2022-03-15 hnical assistance ant Selection technical standards and equi pment of Electricity Distributi on NG-ECOWAS-DEM-367387-C S-INDV / Recruitment of a Se Project coordination and tec Individual Consult Direct - Internation Pending Impleme nior Procurement Advisor to IDA / D8270 Prior 84,000.00 0.00 2023-06-23 2023-06-27 2023-07-02 2023-07-24 2025-07-22 hnical assistance ant Selection al ntation support and advise the RCU Team related to Procurement activities. NG-ECOWAS-DEM-347363-C S-INDV / Recruitment of a Se Project coordination and tec Individual Consult Pending Impleme nior Power Engineer (1) for th IDA / D8270 Post Limited 84,000.00 0.00 2023-06-23 2023-06-26 2023-07-01 2023-08-01 2024-07-26 hnical assistance ant Selection ntation e support of the RCU during t he implementation of the pro ject. NG-ECOWAS-DEM-360191-C S-INDV / Recruitment of Seni Project coordination and tec Individual Consult Open - Internationa Pending Impleme IDA / D8270 Post 84,000.00 0.00 2023-06-23 2023-07-22 2023-08-12 2023-09-16 2024-03-14 or Power Engineer (2) to sup hnical assistance ant Selection l ntation port the RCU during the proje ct implementation. Page 2 PROCUREMENT PLAN (Textual Part) Emergency COVID-19 Project information: Serbia - Response Project (P173892) Project Implementation agency: Ministry of Health Project Coordination Unit (PCU) Date of the Procurement Plan: May 13, 2020 Period covered by this Procurement Plan: June 2020 – April 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: Not applicable. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Not Applicable. Other Relevant Procurement Information. Procurement under the Project will be carried out in accordance with the World Bank Procurement Regulations for IPF borrowers (Borrowers Regulations), July 2016, revised November 2017 and August 2018. The project will be subject to the World Bank’s Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants, revised July 1, 2016; and the provisions stipulated in the Financing Agreement. The procurement and contract management processes will be tracked through the Systematic Tracking of Exchange in Procurement (STEP) system. The major planned procurement includes the following: (i) medical/laboratory equipment, (ii) PPE in facilities and triage; (iii) clinical management equipment; (iv) refurbishment and equipment of medical facilities; (v) capacity building and training (including for mass-media), development of communication strategies, community outreach and support to the project implementation and monitoring; and (vi) expertise for development and training of front-line responders. Given the emergency, all methods as specified under Procurement Regulations can be used, methods ensuring expedited delivery will be first considered. These include direct selection of firms as appropriate, Request for Quotations (RfQ) with no threshold limit for this method as appropriate, Request for Bid, both national and international, open. PROCUREMENT PLAN Method of Procurement Prior / Post Review Category Item Description Component 1: Emergency COVID-19 Response Subcomponent 1.1: Case Detection, Confirmation, Contact Tracing, Recording, Reporting Medical equipment (excluding medical and 1.1.1 sanitation supplies) for SARS-CoV2 labs in S&I RFB Post Kragujevac and Novi Sad Preparation of Detailed Design & Works 1.1.2 CS DS Post supervision 1.1.3 Protective equipment and tests for SARS-CoV2 G RFB Post Integration of all "SARS-CoV2 laboratories in the health information system in order to 1.1.4 G RFB Post create a comprehensive SARS-CoV2 electronic surveillance system 1.1.5 "Walk-in" testing point at the airport S&I RFB Post "Drive-through" testing point at the border 1.1.6 S&I RFB Post road crossing 1.1.7 SEP activities CS CQS Post Unallocated Sub-Component 1.1 total: Subcomponent 1.2: Social Distancing Measures and Communication Preparedness Physical distancing communication messages 1.2.1 CS CQS Post targeting vulnerable populations coordination of support activities for the 1.2.2 CS CQS Post population during social distancing measures Mass communication messages on 'Walk-in' 1.2.3 CS CQS Post and 'Drive-through' testing sites Trainings for PR representatives of healthcare 1.2.4 CS CQS Post facilities Unallocated Sub-Component 1.2 - Total: Subcomponent 1.3: Health System Strengthening Emergency medical vehicles equipped for 1.3.1 G RFB Post transportation of SARS-CoV2 patients 1.3.2 Intensive Care Unit (ICU) beds G RFB Post 1.3.3 Vital signs monitors G RFB Post 1.3.4 Mobile X-ray machines G RFB Post 1.3.5 CT devices S&I RFB Post X-ray devices for COVID clinics in community 1.3.7 G RFB Post healthcare centres Laptop computers for IPH epidemiological 1.3.8 G RFQ Post departments 1.3.9 Vehicles for IPH epidemiological departments G RFQ Post Unallocated Sub-Component 1.3 total: Component 1- Total: Component 2: Implementation Management and Monitoring and Evaluation PCU staff (including M&E specialist and ESIA 2.1 CS DS Post specialist) 2.2 Operating costs na na na 2.3 Financial software CS DS Post 2.4 Audit CS LCS Post Unallocated Component 2- Total: 100, TOTAL 000, 000 PROCUREMENT Serbia : Serbia Emergency COVID-19 Response Project PLAN General Information Country: Serbia 2020-12-11 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173892 GPN Date: 2021-01-21 Project Name: Serbia Emergency COVID-19 Response Project Loan / Credit No: IBRD / 91200 Project Coordination Unit (PCU) Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RS-SECRP-9120YF-G-DS-21- Component 2: Implementati 2.3 / Procurement of Financia IBRD / 91200 on Management and Monitor Post Direct Selection Direct 7,379.96 Signed 2021-02-17 2021-03-03 2021-02-22 2021-03-03 2021-03-29 2021-04-01 2022-05-31 l Software ing and Evaluation RS-SECRP-9120YF-G-RFQ-21 Component 1: Emergency C Request for Quota Open - Internationa Single Stage - One E -1.3.1.2 / Vehicles for IPH epi IBRD / 91200 Post 359,783.97 Completed 2021-03-03 2021-03-22 2021-04-28 2021-05-12 2021-08-26 2021-11-19 OVID-19 Response tions l nvelope demiological departments RS-SECRP-9120YF-G-RFQ-21 Component 1: Emergency C Request for Quota Open - Internationa Single Stage - One E -1.3.8 / Laptop computers for IBRD / 91200 Post 270,956.19 Completed 2021-03-03 2021-03-22 2021-04-28 2021-08-11 2021-08-26 2021-09-25 OVID-19 Response tions l nvelope IPH epidemiological departm ents & MOH RS-SECRP-9120YF-G-RFB-21- Component 1: Emergency C Open - Internationa Single Stage - One E 1.3.1.1 / Ambulances and oth IBRD / 91200 Post Request for Bids 17,248,033.53 Signed 2021-03-15 2021-04-16 2021-03-20 2021-04-22 2021-05-01 2021-06-25 2021-05-31 2021-09-27 2021-07-05 2021-11-09 2022-01-01 OVID-19 Response l nvelope er vehicles RS-SECRP-9120YF-G-RFQ-21 Component 1: Emergency C Request for Quota Single Stage - One E IBRD / 91200 Post Open - National 0.00 Canceled 2021-03-13 2021-07-16 2021-07-16 -1.3.1.3 / Vehicle with cooler OVID-19 Response tions nvelope unit RS-SECRP-9120YF-G-RFQ-21 Component 1: Emergency C Request for Quota Single Stage - One E IBRD / 91200 Post Open - National 180,349.26 Completed 2021-03-13 2021-06-16 2021-05-12 2021-06-16 2021-12-04 -1.3.1.4 / Vehicles with 4WD OVID-19 Response tions nvelope RS-SECRP-9120YF-G-RFB-21- Component 1: Emergency C Open - Internationa Single Stage - One E IBRD / 91200 Post Request for Bids 0.00 Canceled 2021-03-15 2021-03-20 2021-05-01 2021-05-31 2021-07-05 2021-11-02 1.3.12 / Procurement of Ultra OVID-19 Response l nvelope sounds RS-SECRP-9120YF-G-RFB-21- Component 1: Emergency C Open - Internationa Single Stage - One E IBRD / 91200 Post Request for Bids 0.00 Canceled 2021-04-16 2021-04-16 2021-04-21 2021-06-16 2021-06-02 2021-07-02 2021-08-06 2022-02-02 1.3.3 / Vital signs monitors OVID-19 Response l nvelope RS-SECRP-9120YF-G-RFB-21- Component 1: Emergency C Open - Internationa Single Stage - One E 1.3.4 / X-ray devices for hosp IBRD / 91200 Post Request for Bids 19,537,945.67 Signed 2021-05-20 2021-08-04 2021-05-25 2021-12-24 2021-07-06 2022-02-11 2021-08-05 2022-03-18 2021-09-09 2022-04-03 2022-03-08 OVID-19 Response l nvelope itals and primary health care institutions RS-SECRP-9120YF-G-RFB-21- Component 1: Emergency C Open - Internationa Single Stage - One E IBRD / 91200 Post Request for Bids 32,455,131.61 Signed 2021-05-20 2021-08-23 2021-05-25 2021-12-24 2021-07-06 2022-02-17 2021-08-05 2022-03-18 2021-09-09 2022-04-03 2022-03-08 1.3.5 / CT devices OVID-19 Response l nvelope RS-SECRP-9120YF-G-RFQ-21 Component 1: Emergency C Request for Quota Single Stage - One E IBRD / 91200 Post Open - National 0.00 Canceled 2021-05-16 2021-10-18 2021-10-18 -1.3.1.3.A / Vehicle with cool OVID-19 Response tions nvelope er unit RS-SECRP-9120YF-G-RFQ-21 Component 1: Emergency C Request for Quota Single Stage - One E -1.3.1.5 / Light Commercial V IBRD / 91200 Post Open - National 0.00 Canceled 2021-05-18 2021-07-13 2022-01-09 OVID-19 Response tions nvelope ehicles with cooler unit RS-SECRP-9120YF-G-DS-21- 1.3.2 / Contract for the suppl Component 1: Emergency C y of Linet Goods and Related IBRD / 91200 Post Direct Selection Direct 4,689,338.00 Signed 2021-06-04 2021-04-27 2021-06-09 2021-05-15 2021-07-14 2021-06-08 2021-10-12 OVID-19 Response Services: Hospital beds “Eleg anza 2” and “Eleganza 1” RS-SECRP-9120YF-G-DS-21- 1.3.2.1 / Contract for the sup Component 1: Emergency C ply of Linet Goods and Relate IBRD / 91200 Post Direct Selection Direct 718,059.00 Signed 2021-06-04 2021-04-27 2021-06-09 2021-05-15 2021-07-14 2021-06-08 2021-10-12 OVID-19 Response d Services: Children Hospital Beds “TOM 2” and Hospital st retcher “Sprint 100” RS-SECRP-9120YF-G-RFQ-21 Component 1: Emergency C Request for Quota Single Stage - One E -1.1.1 / Hygiene packages for IBRD / 91200 Post Open - National 189,682.69 Signed 2021-06-22 2021-08-17 2021-07-27 2021-10-16 OVID-19 Response tions nvelope vulnerable population RS-SECRP-9120YF-G-RFQ-21 -1.1.1.A / Hygiene packages f Component 1: Emergency C Request for Quota Single Stage - One E IBRD / 91200 Post Open - National 407,014.10 Signed 2021-12-06 2022-01-31 2022-02-08 2022-04-01 or vulnerable population - ad OVID-19 Response tions nvelope ditional quantities RS-SECRP-9120YF-G-DS-21- Component 1: Emergency C 1.3.1.6 / Procurement of Vehi IBRD / 91200 Post Direct Selection Direct 167,529.39 Signed 2021-12-01 2021-11-25 2021-12-06 2021-12-02 2022-01-10 2021-12-28 2022-05-31 OVID-19 Response cles for MoH Sanitary Inspect ion RS-SECRP-9120YF-G-DS-22- Component 1: Emergency C 1.3.9 / Procurement of 16 Hol IBRD / 91200 Post Direct Selection Direct 53,359.84 Signed 2022-01-24 2022-01-14 2022-01-29 2022-01-19 2022-03-05 2022-07-28 2022-06-03 OVID-19 Response oLens 2 devices RS-SECRP-9120YF-G-RFQ-22 -1.3.13 / Procurement of prot Component 1: Emergency C Request for Quota Single Stage - One E ective uniforms and footwear IBRD / 91200 Post Open - National 0.00 Canceled 2022-02-15 2022-04-12 2022-08-10 OVID-19 Response tions nvelope for the employees of the Insti tute of Emergency Medicine Belgrade RS-SECRP-9120YF-G-RFQ-22 -1.3.13.А / Procurement of Pr Component 1: Emergency C Request for Quota Single Stage - One E otective uniforms and footwe IBRD / 91200 Post Open - National 227,718.83 Signed 2022-05-25 2022-07-20 2022-08-05 2023-01-16 OVID-19 Response tions nvelope ar for the employees of the I nstitute of Emergency Medici ne Belgrade Page 1 RS-SECRP-9120YF-G-RFQ-22 Component 1: Emergency C Request for Quota Single Stage - One E -1.1.1.B / Hygiene packages f IBRD / 91200 Post Open - National 0.00 Canceled 2022-08-27 2022-10-27 2023-03-26 OVID-19 Response tions nvelope or vulnerable population in 2 022 RS-SECRP-9120YF-G-RFB-22- Component 1: Emergency C Open - Internationa Single Stage - One E IBRD / 91200 Post Request for Bids 0.00 Signed 2022-08-25 2022-08-24 2022-08-30 2022-08-25 2022-10-11 2022-10-18 2022-11-10 2022-11-14 2022-12-15 2023-04-14 1.3.12 / Procurement of Ultra OVID-19 Response l nvelope sounds RS-SECRP-9120YF-G-RFB-23- Component 1: Emergency C Open - Internationa Single Stage - One E 1.3.1.7 / Procurement of Amb IBRD / 91200 Post Request for Bids 0.00 Canceled 2023-02-10 2023-02-22 2023-02-15 2023-02-23 2023-03-29 2023-04-06 2023-04-28 2023-06-02 2023-08-31 OVID-19 Response l nvelope ulances - Additional quantitie s NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RS-SECRP-9120YF-TS-DS-21- Component 2: Implementati 2.26 / Agency for organizatio IBRD / 91200 on Management and Monitor Post Direct Selection Direct 4,257.28 Signed 2021-04-16 2021-04-14 2021-04-21 2021-04-14 2021-05-26 2021-04-29 2022-05-31 n of trainings, seminars and t ing and Evaluation ravel CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RS-SECRP-9120YF-CS-CQS-2 1-1.2.1 / Messages on physic Component 1: Emergency C Consultant Qualifi IBRD / 91200 Post Open - National 107,601.42 Signed 2021-02-26 2021-02-23 2021-03-19 2021-05-02 2021-05-17 2021-06-01 2021-06-18 2021-07-06 2021-06-24 2022-05-31 al distancing targeting vulner OVID-19 Response cation Selection able populations RS-SECRP-9120YF-CS-CQS-2 1-1.2.2 / Coordination of pop Component 1: Emergency C Consultant Qualifi IBRD / 91200 Post Open - National 108,015.77 Signed 2021-03-08 2021-03-02 2021-03-29 2021-05-12 2021-05-17 2021-06-11 2021-06-18 2021-07-16 2021-06-24 2022-05-31 ulation support activities duri OVID-19 Response cation Selection ng physical distancing measu res RS-SECRP-9120YF-CS-CQ-22 -1.1.2.1 / Technical control of design documentation for the Component 1: Emergency C Consultant Qualifi construction of new diagnosti IBRD / 91200 Post Open - National 31,931.24 Signed 2022-02-14 2022-02-10 2022-03-07 2022-04-20 2022-05-06 2022-05-20 2022-06-28 2022-06-24 2022-07-14 2022-08-13 OVID-19 Response cation Selection c building including BSL-3 lab oratory at the “Torlak” Institu te of Virology, Vaccines and Sera, Belgrade RS-SECRP-9120YF-CS-CQS-2 2-1.1.2.2 / Environmental an d Social Impact Assessment ( ESIA) and Environmental and Component 1: Emergency C Consultant Qualifi Open - Internationa IBRD / 91200 Post 0.00 Canceled 2022-02-17 2022-03-01 2022-03-10 2022-03-09 2022-04-23 2022-05-23 2022-06-27 2022-10-25 Social Management Plan (ES OVID-19 Response cation Selection l MP) for New diagnostic labor atory building with BSL-3 at t he „Torlak“ Institute of Virolo gy, Vaccines and Sera, Belgr ade INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RS-SECRP-9120YF-CS-DS-20- Component 2: Implementati 2.16 / Environmental Speciali IBRD / 91200 on Management and Monitor Post Direct Selection Direct 36,744.60 Signed 2020-12-14 2020-12-11 2020-12-24 2020-12-17 2021-02-27 2021-01-05 2022-05-31 st ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-20- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 37,817.85 Signed 2020-12-14 2020-12-11 2020-12-24 2020-12-15 2021-02-27 2020-12-26 2022-05-31 2.17 / Social Specialist ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-20- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 42,532.39 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-20 2022-05-31 2.1 / PCU Coordinator ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-20- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 32,265.95 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-16 2022-05-31 2.5 / Finance Specialist ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-20- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 26,467.78 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-13 2021-02-01 2021-01-16 2022-05-31 2.6 / Finance Officer ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-20- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 32,265.95 Signed 2020-12-28 2020-12-29 2021-01-07 2021-01-13 2021-02-01 2021-01-16 2022-05-31 2.7 / Procurement Specialist ing and Evaluation RS-SECRP-9120YF-CS-DS-20- Component 2: Implementati 2.8 / Monitoring and Evaluati IBRD / 91200 on Management and Monitor Post Direct Selection Direct 27,999.55 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-16 2022-05-31 on Specialist ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-20- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 16,299.99 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-16 2022-05-31 2.9 / Administrative assistant ing and Evaluation RS-SECRP-9120YF-CS-DS-20- Component 2: Implementati 2.10 / Administrative assista IBRD / 91200 on Management and Monitor Post Direct Selection Direct 16,040.38 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-16 2022-05-31 nt ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-20- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 63,809.98 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-20 2022-05-31 2.14 / Building expert ing and Evaluation RS-SECRP-9120YF-CS-DS-20- Component 2: Implementati 2.4 / Coordinator of the Subc IBRD / 91200 on Management and Monitor Post Direct Selection Direct 38,132.50 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-13 2021-02-01 2021-01-16 2022-05-31 omponent 1.3 ing and Evaluation RS-SECRP-9120YF-CS-DS-20- Component 2: Implementati 2.2 / Coordinator of the Subc IBRD / 91200 on Management and Monitor Post Direct Selection Direct 32,952.24 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-16 2022-05-31 omponent 1.1 ing and Evaluation Page 2 RS-SECRP-9120YF-CS-DS-20- Component 2: Implementati 2.3 / Coordinator of the Subc IBRD / 91200 on Management and Monitor Post Direct Selection Direct 31,999.35 Signed 2020-12-28 2020-12-28 2021-01-07 2021-01-04 2021-02-01 2021-01-16 2022-05-31 omponent 1.2 ing and Evaluation RS-SECRP-9120YF-CS-DS-21- Component 2: Implementati 2.11 / Health Care Strengthe IBRD / 91200 on Management and Monitor Post Direct Selection Direct 25,620.95 Signed 2021-02-17 2021-02-23 2021-02-27 2021-03-05 2021-05-03 2021-03-17 2022-05-31 ning Specialist ing and Evaluation RS-SECRP-9120YF-CS-DS-21- Component 2: Implementati 2.12 / Health Care Organizati IBRD / 91200 on Management and Monitor Post Direct Selection Direct 23,141.37 Signed 2021-02-17 2021-02-23 2021-02-27 2021-03-03 2021-05-03 2021-03-13 2022-05-31 on and Financing Specialist ing and Evaluation RS-SECRP-9120YF-CS-DS-21- Component 2: Implementati 2.13 / Health Care Organizati IBRD / 91200 on Management and Monitor Post Direct Selection Direct 23,141.37 Signed 2021-02-17 2021-02-23 2021-02-27 2021-03-03 2021-05-03 2021-03-17 2022-05-31 on and Financing Specialist ing and Evaluation RS-SECRP-9120YF-CS-DS-21- 1.3.6 / Design, supervision, p Component 1: Emergency C IBRD / 91200 Post Direct Selection Direct 1,538,376.76 Signed 2021-02-17 2021-02-23 2021-02-27 2021-03-03 2021-05-03 2021-04-13 2022-05-31 roject management and tech OVID-19 Response nical support services Component 2: Implementati RS-SECRP-9120YF-CS-DS-21- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 105,344.16 Signed 2021-03-08 2021-03-24 2021-03-18 2021-03-15 2021-04-12 2021-04-01 2022-05-31 2.15 / Procurement Specialist ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-21- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 59,839.61 Signed 2021-04-26 2021-06-04 2021-05-06 2021-06-15 2021-07-10 2021-07-04 2022-05-31 2.22 / Legal Consultant ing and Evaluation RS-SECRP-9120YF-CS-DS-21- Component 2: Implementati 2.23 / Administrative Assista IBRD / 91200 on Management and Monitor Post Direct Selection Direct 15,707.50 Signed 2021-04-26 2021-06-04 2021-05-06 2021-06-17 2021-07-10 2021-07-02 2022-05-31 nt ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-21- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 11,410.17 Completed 2021-04-26 2021-06-04 2021-05-06 2021-06-15 2021-07-10 2021-07-02 2022-05-31 2021-11-11 2.24 / IT Consultant ing and Evaluation RS-SECRP-9120YF-CS-DS-21- Component 2: Implementati 2.25 / Citizen Engagement a IBRD / 91200 on Management and Monitor Post Direct Selection Direct 23,799.24 Signed 2021-04-26 2021-06-04 2021-05-06 2021-06-14 2021-07-10 2021-07-05 2022-05-31 nd Roma mediation consulta ing and Evaluation nt Component 2: Implementati RS-SECRP-9120YF-CS-DS-21- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 60,772.76 Signed 2021-04-26 2021-05-12 2021-05-06 2021-05-20 2021-07-10 2021-10-09 2022-05-31 2.21 / Audit ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-IC-21- Individual Consult IBRD / 91200 on Management and Monitor Post Limited 21,479.43 Signed 2021-04-26 2021-06-04 2021-05-01 2021-07-02 2021-05-22 2021-06-26 2021-07-31 2022-05-31 2.18 / PR Specialist ant Selection ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-21- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 29,811.28 Signed 2021-12-24 2021-12-22 2022-01-03 2022-01-10 2022-03-09 2022-01-13 2022-05-31 2.27 / IT Consultant ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.30 / Laboratory Bio Safety IBRD / 91200 on Management and Monitor Post Direct Selection Direct 20,707.31 Signed 2022-02-14 2022-02-10 2022-02-24 2022-02-17 2022-04-30 2022-03-12 2022-07-29 Expert ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-22- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 27,604.63 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 2.31 / PCU Coordinator ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.32 / Coordinator of the Sub IBRD / 91200 on Management and Monitor Post Direct Selection Direct 21,253.17 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-21 2022-05-15 2022-04-10 2023-08-31 component 1.1 ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.33 / Coordinator of the Sub IBRD / 91200 on Management and Monitor Post Direct Selection Direct 20,768.41 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 component 1.2 ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.34 / Coordinator of the Sub IBRD / 91200 on Management and Monitor Post Direct Selection Direct 24,748.98 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 component 1.3 ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-22- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 20,941.44 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 2.35 / Finance Specialist ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-22- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 17,133.91 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 2.36 / Finance Officer ing and Evaluation Component 2: Implementati RS-SECRP-9120YF-CS-DS-22- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 20,941.44 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 2.37 / Procurement Specialist ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.38 / Monitoring and Evaluat IBRD / 91200 on Management and Monitor Post Direct Selection Direct 18,172.44 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 ion Specialist ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.39 / Administrative assista IBRD / 91200 on Management and Monitor Post Direct Selection Direct 10,384.16 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 nt 1 ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.40 / Administrative assista IBRD / 91200 on Management and Monitor Post Direct Selection Direct 10,384.16 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 nt 2 ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.41 / Administrative assista IBRD / 91200 on Management and Monitor Post Direct Selection Direct 10,384.16 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 nt 3 ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.42 / Health Care Strengthe IBRD / 91200 on Management and Monitor Post Direct Selection Direct 18,548.24 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 ning Specialist ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.43 / Citizen Engagement a IBRD / 91200 on Management and Monitor Post Direct Selection Direct 16,969.09 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-05-06 2023-08-31 nd Roma mediation consulta ing and Evaluation nt Page 3 Component 2: Implementati RS-SECRP-9120YF-CS-DS-22- IBRD / 91200 on Management and Monitor Post Direct Selection Direct 15,619.96 Signed 2022-03-01 2022-03-19 2022-03-11 2022-03-23 2022-05-15 2022-04-10 2023-08-31 2.44 / PR Specialist ing and Evaluation RS-SECRP-9120YF-CS-IC-22- 1.3.14.A-D / Consultant for M Component 1: Emergency C Individual Consult onitoring the Implementation IBRD / 91200 Post Open 82,914.48 Signed 2022-04-26 2022-04-20 2022-06-14 2022-05-20 2022-07-05 2022-05-25 2022-08-09 2022-06-10 2023-02-05 OVID-19 Response ant Selection of Diagnostic Equipment Proc urement Contracts (4 consult ants) RS-SECRP-9120YF-CS-DS-22- 1.1.2.2 / Environmental and Social Impact Assessment (E SIA) and Environmental and Component 1: Emergency C Direct - Internation IBRD / 91200 Post Direct Selection 0.00 Signed 2022-08-22 2022-08-19 2022-09-01 2022-08-26 2022-11-05 2023-04-04 Social Management Plan (ES OVID-19 Response al MP) for New diagnostic labor atory building with BSL-3 at t he „Torlak“ Institute of Virolo gy, Vaccines and Sera, Belgr ade RS-SECRP-9120YF-CS- DS-22 Component 2: Implementati -2.45 / Consultant for data co IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 17,626.85 Signed 2022-09-05 2022-09-01 2022-09-15 2022-09-05 2022-11-19 2022-09-19 2023-08-31 llection, analysis and contrac ing and Evaluation t monitoring in public health i nstitutions RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.46 / FM specialist/fixed ass IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 ets registration ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.47 / Consultant for costing/ IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 PHC facilities ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.48 / Consultant for costing/ IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 hospitals ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.49 / IT consultant/DRG Gro IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 uper and hospital informatio ing and Evaluation n system RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.50 / Health Care Organizati IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 on and Financing Specialist/P ing and Evaluation HC RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.51 / Health Care Organizati IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 on and Financing Specialist/h ing and Evaluation ospitals RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.52 / Health Care Organizati IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 on and Financing Specialist/D ing and Evaluation RG implementation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.53 / IT Consultant for Sub-c IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 omponent 1.1/MOH eHealth s ing and Evaluation upport RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.55 / IT Consultant for Sub-c IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 omponent 1.3/MOH eHealth s ing and Evaluation upport RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.54 / IT Consultant for Sub-c IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 omponent 1.2/MOH eHealth s ing and Evaluation upport Component 2: Implementati RS-SECRP-9120YF-CS-DS-22- IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 2.56 / Driver ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.57 / Translator for PCU-Mo IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 H ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.58 / Translator for PCU-Mo IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 H ing and Evaluation RS-SECRP-9120YF-CS-DS-22- Component 2: Implementati 2.59 / Translator for PCU-Mo IBRD / 91200 on Management and Monitor Post Direct Selection Direct - National 0.00 Signed 2022-12-12 2022-12-16 2022-12-22 2022-12-23 2022-12-31 2023-08-31 H ing and Evaluation RS-SECRP-9120YF-CS-DS-23- 2.62 / Consultant for prepara tion of Labor Management Pr Component 2: Implementati Individual Consult Under Implement ocedures (LMP), the Stakehol IBRD / 91200 on Management and Monitor Post Direct - National 0.00 2023-05-24 2023-05-22 2023-06-03 2023-05-25 2023-06-24 2023-05-26 2023-07-29 2023-11-04 ant Selection ation der Engagement Plan (SEP) a ing and Evaluation nd the Environmental and So cial Commitment Plan (ESCP) for SNDPCP RS-SECRP-9120YF-CS-DS-23- Component 2: Implementati 2.63 / Consultant for prepara Individual Consult Under Implement IBRD / 91200 on Management and Monitor Post Direct - National 0.00 2023-05-24 2023-05-22 2023-06-03 2023-05-25 2023-06-24 2023-05-26 2023-07-29 2023-11-04 tion of Environmental and So ant Selection ation ing and Evaluation cial Framework (ESMF) for SN DPCP Page 4 PROCUREMENT PLAN (Textual Part) Project information: [Mozambique Conservation Areas for Biodiversity and Development Project, Phase 2country] [Project name (] [P166802)P-number] Project Implementation agency: Ministry of Land, Environment and Rural Development - International Funds Management Unit [insert legal name ] Date of the Procurement Plan: [September 21, 2018insert date] Period covered by this Procurement Plan: [September 21, 2018insert from – December 31, 2019 to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables. Not Applicable. Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: not applicable. [ is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: not applicable [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. The Borrower will carry out procurement in accordance with the World Bank’s ‘Procurement Regulations for IPF Borrowers’ (Procurement Regulations), dated July 2016 and revised in November 2017 under the NPF, and the ‘Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants’, dated July 1, 2016. The UGFI will assume the responsibility of executing all procurement activities during implementation of MozBio 2, including the ones that are within the leading role of BIOFUND. BIOFUND will create internal capacity to carry out the procurement process, and may assume the responsibility over procurement of their tasks within MozBio 2, if that capacity is deemed satisfactory by the World Bank. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Mozambique : Mozambique Conservation Areas for Biodiversity and Development - Phase 2 PLAN General Information Country: Mozambique 2018-10-02 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166802 GPN Date: 2022-06-20 Project Name: Mozambique Conservation Areas for Biodiversity and Development - Phase 2 Loan / Credit No: IDA / D3720, / , TF / B4664 MINISTRY OF LAND, ENVIRONMENT AND RURAL DEVELOPMENT - International Funds Management Unit Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 06/MOZBIO/W/18 / Construct Component 2: Improving Co Single Stage - One E 2020-05-1 ion of and Rehabilitation of O IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 618,000.00 0.00 Canceled 2019-07-29 2019-08-03 2019-09-14 2019-10-14 2019-11-18 nvelope 6 utposts in REM nt in target landscapes 07/MOZBIO/W/18 / Campsite Component 2: Improving Co Request for Quota Single Stage - One E 2019-09-2 s & Landing Strip for Marrom / nservation Areas Manageme Post Limited 91,000.00 0.00 Canceled 2019-01-29 2019-03-26 tions nvelope 2 eu Reserve nt in target landscapes 08/MOZBIO/W/2018 / Repair Component 2: Improving Co Single Stage - One E 2019-12-1 of the Road Network of Chim / nservation Areas Manageme Post Request for Bids Open - National 645,000.00 0.00 Canceled 2019-02-27 2019-03-04 2019-04-15 2019-05-15 2019-06-19 nvelope 6 animani nt in target landscapes 39/MOZBIO/W/19 / Improve Component 2: Improving Co Single Stage - One E 2020-05-1 ment of 4.1 km of access roa IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 500,000.00 494,658.91 Completed 2019-07-31 2019-07-01 2019-08-05 2019-09-16 2019-08-16 2019-10-16 2019-12-20 2019-11-20 2020-01-30 nvelope 8 ds in the REM nt in target landscapes 62/MOZBIO/W/2020 / Constr Component 2: Improving Co Single Stage - One E 1,768,435.9 2021-04-1 uction and Rehabilitation of I IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 1,000,000.00 Signed 2020-06-30 2021-03-15 2020-07-05 2021-04-05 2020-08-16 2021-06-22 2020-09-15 2021-07-30 2020-10-20 2021-10-01 nvelope 7 8 nfrastructures in REM nt in target landscapes 89/W/MOZBIO/20 / Construct Component 2: Improving Co Single Stage - One E 1,030,937.5 2021-10-0 ion of the infrastructures of t IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 800,000.00 Signed 2020-12-01 2021-06-30 2020-12-11 2021-01-22 2021-08-10 2021-03-03 2021-08-30 2021-04-07 2021-10-01 nvelope 7 4 he Chimanimani National Par nt in target landscapes k 98/MOZBIO/W/2020 / Rehabi Component 2: Improving Co Request for Quota Single Stage - One E 2021-08-2 litation of the offices of the M IDA / D3720 nservation Areas Manageme Post Limited 35,000.00 19,516.29 Signed 2021-01-04 2021-03-19 2021-03-01 2021-05-12 tions nvelope 8 arromeu National Reserve nt in target landscapes National Procure 136/W/MOZBIO/RFQ/2022 / Component 2: Improving Co ment Document - Construction of a meeting ro Request for Quota Single Stage - One E 2023-05-1 IDA / D3720 nservation Areas Manageme Post Limited 1 Envelope proce 65,000.00 0.00 Signed 2022-09-20 2022-09-13 2022-11-15 om in the offices of the Marro tions nvelope 4 nt in target landscapes ss (Non Bank-SPD meu National Reserve. ) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 24/MOZBIO/G/18 / Acquisitio Component 2: Improving Co Request for Quota Open - Internationa Single Stage - One E n of elephant sealing materia IDA / D3720 nservation Areas Manageme Post 100,000.00 0.00 Canceled 2018-12-24 2019-02-18 2019-08-19 tions l nvelope l at REM nt in target landscapes 19/MOZBIO/G/8 / Communic Component 2: Improving Co Single Stage - One E ation documents and materia IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 131,800.00 0.00 Canceled 2019-02-18 2019-02-23 2019-04-06 2019-05-06 2019-06-10 2019-12-07 nvelope ls for Mozbio nt in target landscapes Component 2: Improving Co 41/MOZBIO/CS/19 / Vehicles UN Agencies (Dire IDA / D3720 nservation Areas Manageme Post Direct 250,000.00 290,581.19 Signed 2019-08-26 2019-07-08 2019-08-31 2019-07-17 2019-10-05 2019-07-23 2020-04-02 for CAs and LMUs ct) nt in target landscapes Component 1: Strengthening 42/MOZBIO/CS/19 / IT equip Capacity and Financial Susta Single Stage - One E ment for ANAC, CAs and LMU IDA / D3720 Post Request for Bids Open - National 170,000.00 167,166.66 Signed 2019-08-28 2019-08-20 2019-09-02 2019-08-29 2019-10-14 2019-09-30 2019-11-13 2019-11-21 2019-12-18 2019-12-07 2020-06-15 inability of National Conserv nvelope s ation Institutions 52/MOZBIO/G/19 / Acquisitio Component 2: Improving Co Request for Quota Single Stage - One E n for tractor for maintenance IDA / D3720 nservation Areas Manageme Post Limited 66,000.00 60,611.98 Completed 2019-09-30 2019-10-16 2019-11-25 2019-11-29 2020-05-23 2020-04-24 tions nvelope of the reserve MER nt in target landscapes 57/MOZBIO/G/19 / Acquisitio Component 2: Improving Co n of uniforms for ANAC inspe IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 50,000.00 50,000.00 Signed 2019-12-30 2020-01-06 2020-01-04 2020-01-28 2020-02-08 2020-02-01 2020-08-06 ctors nt in target landscapes Component 2: Improving Co 58/MOZBIO/G/20 / Acquisitio Request for Quota Single Stage - One E IDA / D3720 nservation Areas Manageme Post Limited 26,000.00 29,750.00 Completed 2020-05-04 2020-02-18 2020-06-29 2020-04-15 2020-12-26 2020-07-01 n motorcycles for REM tions nvelope nt in target landscapes Component 3: Promoting co 61/MOZBIO/G/2020 / Office f nservation-compatible rural Request for Quota Single Stage - One E IDA / D3720 Post Limited 10,000.00 9,602.07 Signed 2020-04-05 2020-02-18 2020-05-31 2020-03-27 2020-11-27 urniture for matutuine development and integrated tions nvelope landscape management in t arget landscapes Component 2: Improving Co 21/MOZBIO/G/18 / Vehicles f Request for Quota Single Stage - One E Under Imple IDA / D3720 nservation Areas Manageme Post Limited 61,800.00 0.00 2020-12-07 2021-11-08 2021-02-01 2021-07-31 or Biofund tions nvelope mentation nt in target landscapes Component 2: Improving Co 20/MOZBIO/G/18 / Office fur Request for Quota Single Stage - One E Pending Impl IDA / D3720 nservation Areas Manageme Post Limited 8,200.00 0.00 2020-11-28 2021-01-23 2021-07-22 niture for Biofund tions nvelope ementation nt in target landscapes 22/MOZBIO/G/18 / Electronic Component 2: Improving Co Request for Quota Single Stage - One E Under Imple Equipment & Materials for Bi IDA / D3720 nservation Areas Manageme Post Limited 27,800.00 0.00 2021-01-08 2021-11-08 2021-03-05 2021-09-01 tions nvelope mentation ofund nt in target landscapes 63/MOZBIO/G/2020 / Acquisi Component 2: Improving Co Single Stage - One E tion of Materials and Equipm IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 150,000.00 119,706.37 Signed 2020-06-30 2020-07-30 2020-07-05 2020-08-25 2020-08-16 2020-10-02 2020-09-15 2020-11-03 2020-10-20 2020-12-30 2021-04-18 nvelope ent for the Chimanimani Nati nt in target landscapes onal Reserve Page 1 40/MOZBIO/G/19-1 / Supply Component 2: Improving Co Single Stage - One E and Installation of The VHF R IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 200,000.00 307,879.50 Signed 2020-03-31 2019-07-01 2020-04-05 2020-05-17 2019-08-19 2020-06-16 2020-02-25 2020-07-21 2020-05-01 2021-01-17 nvelope adio System in Chimanimani nt in target landscapes National Reserve 40/MOZBIO/G/19 / Supply an Component 2: Improving Co d installation of the VHF radi Single Stage - One E IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 200,000.00 0.00 Canceled 2019-08-26 2020-03-04 2019-08-31 2019-10-12 2019-08-19 2019-11-11 2019-12-16 2020-06-13 o system in the Chimanimani nvelope nt in target landscapes National Reserve 67/MOZBIO/G/2020 / acquisi Component 2: Improving Co Request for Quota Single Stage - One E tion of air conditioning for Ma IDA / D3720 nservation Areas Manageme Post Limited 3,000.00 2,317.00 Signed 2020-06-02 2020-06-12 2020-07-28 2020-09-01 2021-01-24 tions nvelope tutuine nt in target landscapes 57/MOZBIO/G/2020 / Acquisi Component 2: Improving Co tion of uniform for ANAC insp IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 42,000.00 39,633.49 Signed 2020-06-22 2020-05-08 2020-06-27 2020-05-08 2020-08-01 2020-05-19 2021-01-28 ectors nt in target landscapes 66/MOZBIO/G/2020 / Acquisi Component 2: Improving Co tion of boat for REM Chimani IDA / D3720 nservation Areas Manageme Post Request for Bids 230,000.00 211,487.53 Completed 2020-05-28 2020-07-06 2020-05-28 2020-06-23 2020-08-19 2020-06-23 2020-09-01 2020-06-23 2020-10-01 2020-06-23 2020-12-30 mani & Marromeu nt in target landscapes 73/MOZBIO/G/2020 / Acquisi Component 2: Improving Co Request for Quota Single Stage - One E tion of first aid kits for inspec IDA / D3720 nservation Areas Manageme Post Limited 1,500.00 9,479.27 Completed 2020-08-02 2020-08-10 2020-09-27 2020-08-28 2021-03-26 2020-10-02 tions nvelope tors for ANAC nt in target landscapes 76/MOZBIO/G/20 / Acquisitio Component 2: Improving Co Request for Quota Single Stage - One E n of plumbing materials for t IDA / D3720 nservation Areas Manageme Post Limited 12,000.00 10,028.54 Completed 2020-09-05 2020-08-24 2020-10-31 2020-09-05 2021-04-29 2020-12-29 tions nvelope he water supply system in Ch nt in target landscapes imanimani Component 2: Improving Co 42-1/MOZBIO/G/20 / It Equip Request for Quota Single Stage - One E IDA / D3720 nservation Areas Manageme Post Limited 4,500.00 4,920.66 Signed 2020-11-25 2020-11-09 2021-01-20 2020-12-16 2021-07-19 ment tions nvelope nt in target landscapes 92/MOZBIO/G/20 / Acquisitio Component 2: Improving Co n of materials for the rehabili Request for Quota Single Stage - One E Pending Impl IDA / D3720 nservation Areas Manageme Post Limited 11,000.00 0.00 2020-12-05 2021-01-30 2021-07-29 tation of rangers camp in the tions nvelope ementation nt in target landscapes Chimanimani National Park Component 1: Strengthening 101/MOZBIO/G/21 / Acquisiti Capacity and Financial Susta UN Agencies (Dire on of 10 vehicles Land Cruise IDA / D3720 Post Direct 400,000.00 0.00 Canceled 2021-03-31 2021-04-05 2021-05-10 2021-11-06 inability of National Conserv ct) rs for FNDS ation Institutions 102/MOZBIO/G/21 / Acquisiti Component 2: Improving Co Request for Quota Single Stage - One E on of Camping Tents for Con IDA / D3720 nservation Areas Manageme Post Limited 40,000.00 0.00 Canceled 2021-04-07 2021-03-19 2021-06-02 2021-11-29 tions nvelope servation Areas nt in target landscapes 114/G/MOZBIO/2021 / Acqui Component 3: Promoting co sition of coffee seedlings as p nservation-compatible rural Request for Quota Single Stage - One E IDA / D3720 Post Limited 100,000.00 101,404.03 Completed 2021-12-15 2021-11-19 2022-02-09 2021-12-21 2022-08-08 2022-01-08 art of the Chimanimani lands development and integrated tions nvelope cape restoration plan landscape management in t arget landscapes 116/G/MOZBIO/RFQ/2022 / B Component 1: Strengthening rochure of Investment Oppor Capacity and Financial Susta Request for Quota Single Stage - One E IDA / D3720 Post Limited 10,000.00 0.00 Canceled 2022-01-25 2022-03-22 2022-09-18 tunity in Tourism in Mozambi inability of National Conserv tions nvelope que. ation Institutions 120/G/MOZBIO/RFQ/2022 / A Component 2: Improving Co Request for Quota Single Stage - One E cquisition of coffee seedlings IDA / D3720 nservation Areas Manageme Post Limited 100,000.00 101,404.03 Signed 2022-03-05 2022-02-10 2022-04-30 2022-03-09 2022-10-27 tions nvelope for the Mussapa area. nt in target landscapes 119/G/MOZBIO/RFQ/2022 / A Component 2: Improving Co Request for Quota Single Stage - One E cquisition of coffee seedlings IDA / D3720 nservation Areas Manageme Post Limited 100,000.00 101,404.03 Signed 2022-03-05 2022-02-10 2022-04-30 2022-03-09 2022-10-27 tions nvelope for the Tsetsere area. nt in target landscapes 122/G/MOZBIO/DS/2022 / Ac Component 3: Promoting co quisition of 231 pairs of unifo nservation-compatible rural TF / B4664 Post Direct Selection Direct 100,000.00 109,652.17 Signed 2022-05-12 2022-04-25 2022-05-17 2022-04-25 2022-06-21 2022-05-26 2022-12-18 rms for AQUA inspectors and development and integrated 7 military tents with a capaci landscape management in t ty of 10 people. arget landscapes 126/G/MOZBIO/RFQ/2022 / A cquisition of material for the Component 2: Improving Co Request for Quota Single Stage - One E repair of drifts and wet passe IDA / D3720 nservation Areas Manageme Post Limited 100,000.00 0.00 Signed 2022-07-05 2022-06-13 2022-08-30 2023-02-26 tions nvelope s on access roads in the Nati nt in target landscapes onal Park of Chimanimani. 127/G/MOZBIO/RFQ/2022 / A Component 1: Strengthening cquisition of communication Capacity and Financial Susta Request for Quota Single Stage - One E IDA / D3720 Post Limited 46,600.00 0.00 Signed 2022-06-22 2022-06-07 2022-08-17 2023-02-13 and marketing material for A inability of National Conserv tions nvelope NAC. ation Institutions 128/G/MOZBIO/RFQ/2022 / P Component 2: Improving Co Request for Quota Single Stage - One E roduction of Communication IDA / D3720 nservation Areas Manageme Post Limited 3,500.00 0.00 Canceled 2022-07-05 2022-08-30 2023-02-26 tions nvelope Material for Awareness at AP nt in target landscapes A. 137/G/MOZBIO/RFQ/2022 / A Component 2: Improving Co Request for Quota Single Stage - One E cquisition of two containers f IDA / D3720 nservation Areas Manageme Post Limited 15,000.00 0.00 Signed 2022-11-05 2022-09-08 2022-12-31 2023-06-29 tions nvelope or the Marromeu Reserve nt in target landscapes 138/G/MOZBIO/DS/2022 / Ac Component 3: Promoting co quisition of 231 pairs of unifo nservation-compatible rural rms and 117 pairs of boots fo IDA / D3720 development and integrated Post Direct Selection Direct - National 40,000.00 0.00 Signed 2022-10-20 2022-11-02 2022-10-25 2022-09-08 2022-11-29 2023-05-28 r AQUA inspectors in Maputo, landscape management in t Sofala and Manica provinces. arget landscapes Component 1: Strengthening 138/G/MOZBIO/RFQ/2022 / P Capacity and Financial Susta Request for Quota Single Stage - One E urchase of a motorized tricyc IDA / D3720 Post Limited 4,600.00 0.00 Signed 2022-11-04 2022-10-03 2022-12-30 2023-06-28 inability of National Conserv tions nvelope le ation Institutions Component 3: Promoting co 143/G/MOZBIO/RFQ/2022 / A nservation-compatible rural Request for Quota Single Stage - One E IDA / D3720 Post Limited 32,000.00 0.00 Canceled 2023-02-04 2023-04-01 2023-09-28 cquisition of IT material development and integrated tions nvelope landscape management in t arget landscapes 148/G/MOZBIO/RFQ/2023 / A Component 1: Strengthening cquisition of IT equipment for Capacity and Financial Susta Request for Quota Single Stage - One E Under Imple IDA / D3720 Post Limited 55,000.00 0.00 2023-03-05 2023-02-06 2023-04-30 2023-10-27 FNDS central level and Lands inability of National Conserv tions nvelope mentation cape Management Units ation Institutions Page 2 158/G/MOZBIO/RFQ/2023 / A cquisition of construction ma Component 2: Improving Co Request for Quota Single Stage - One E Pending Impl terials for access roads to th TF / B4664 nservation Areas Manageme Post Limited 95,000.00 0.00 2023-10-25 2023-12-20 2024-06-17 tions nvelope ementation e Chimanimani National Park nt in target landscapes inbox. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 2: Improving Co 05/MOZBIO/NCS/18 / Wildlife IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 483,000.00 483,000.00 Signed 2019-01-30 2019-01-30 2019-02-04 2019-01-30 2019-03-11 2019-02-28 2019-09-07 Translocation (REM) nt in target landscapes Component 1: Strengthening 01/MOZBIO/NCS/18 / Design Capacity and Financial Susta Open - Internationa Single Stage - One E Acquisition and Installation of IDA / D3720 Prior Request for Bids 2,500,000.00 0.00 Canceled 2019-11-01 2019-11-06 2019-12-18 2020-01-17 2020-02-21 2020-08-19 inability of National Conserv l nvelope e-visa System ation Institutions 32/MOZBIO/NCS/19 / Product Component 1: Strengthening ion of audio visual materials Capacity and Financial Susta IDA / D3720 Post Direct Selection Direct 620,000.00 638,063.05 Signed 2019-03-01 2019-07-08 2019-03-06 2019-03-26 2019-04-10 2019-07-12 2024-03-14 and communication material inability of National Conserv s for Mozbio 2 ation Institutions 33/MOZBIO/NCS/19 / Wildlife Component 2: Improving Co Single Stage - One E Census in the Marromeu Co IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 110,000.00 0.00 Canceled 2019-03-01 2019-04-01 2019-03-06 2019-04-17 2019-05-17 2019-06-21 2019-12-18 nvelope mplex nt in target landscapes 43/MOZBIO/NCS/19 / Wildlife Component 2: Improving Co Single Stage - One E Census in the Marromeu Com IDA / D3720 nservation Areas Manageme Post Request for Bids Open - National 350,000.00 363,017.91 Signed 2019-08-30 2019-08-01 2019-09-04 2019-10-16 2019-09-12 2019-11-15 2019-09-30 2019-12-20 2019-10-30 2020-06-17 nvelope plex nt in target landscapes 50/MOZBIO/NCS/2019 / ANA Component 1: Strengthening C's integrated data manage Capacity and Financial Susta IDA / D3720 Post Direct Selection Direct 48,000.00 46,200.08 Signed 2019-08-30 2019-09-20 2019-09-04 2019-07-15 2019-10-09 2019-09-30 2020-04-06 ment and web information ge inability of National Conserv neration system and hosting ation Institutions 71/MOZBIO/NCS/20 / Biodive Component 2: Improving Co rsity Surveys Chimanimani N IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 40,000.00 0.00 Canceled 2020-06-24 2020-06-19 2020-07-06 2020-06-26 2020-08-12 2022-05-24 ational Reserve II nt in target landscapes 75/NCS/MOZBIO/2020 / Servi Component 1: Strengthening ces to organize an event to c Capacity and Financial Susta Request for Quota Single Stage - One E IDA / D3720 Post Limited 50,000.00 23,619.73 Signed 2020-07-28 2020-07-10 2020-09-22 2020-07-21 2021-03-21 elebrate 60 years of Conserv inability of National Conserv tions nvelope ation Areas in Maputo Specia ation Institutions l Reserve 50-1/NCS/MOZBIO/2020 / Im Component 1: Strengthening provement of the ANAC Data Capacity and Financial Susta IDA / D3720 Post Direct Selection Direct 33,000.00 0.00 Canceled 2020-08-19 2020-08-24 2020-09-28 2021-03-27 base and installation of the o inability of National Conserv ffline system ation Institutions 77/MOZBIO/NCS/20 / Design, update, maintenance and co Component 1: Strengthening ntent management of the Mi Capacity and Financial Susta Request for Quota Single Stage - One E IDA / D3720 Post Limited 16,000.00 14,772.45 Signed 2020-09-27 2020-08-18 2020-11-22 2020-08-31 2021-05-21 nistry of Land and Environme inability of National Conserv tions nvelope nt website and of the Nationa ation Institutions l Administration of Conservat ion Areas website 71-1/MOZBIO/NCS/20 / Biodi Component 2: Improving Co Pending Impl versity Surveys Chimanimani IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 80,000.00 0.00 2020-08-10 2020-08-16 2020-09-21 2022-08-22 ementation National Reserve nt in target landscapes 83/MOZBIO/NCS/20 / Hiring Component 1: Strengthening a company to provide ANAC Capacity and Financial Susta Request for Quota Single Stage - One E IDA / D3720 Post Limited 30,000.00 42,022.71 Completed 2020-10-11 2020-08-05 2020-12-10 2020-08-27 2021-06-08 2020-08-27 Conservation Events organiz inability of National Conserv tions nvelope ation services ation Institutions Component 1: Strengthening 90/NCS/MOZBIO/20 / Hiring Capacity and Financial Susta Request for Quota Single Stage - One E IDA / D3720 Post Limited 20,000.00 16,807.84 Signed 2020-10-12 2020-09-15 2020-12-07 2020-09-25 2021-06-05 a company to print reports inability of National Conserv tions nvelope ation Institutions 79/MOZBIO/NCS/20 / Installa Component 2: Improving Co tion of the EarthRanger syste IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 500,000.00 0.00 Canceled 2020-10-28 2020-11-02 2020-12-07 2021-06-05 m in Conservation Areas nt in target landscapes Component 1: Strengthening 96/MOZBIO/NCS/20 / Installa Capacity and Financial Susta tion of the electronic system IDA / D3720 Post Direct Selection Direct 250,000.00 200,000.00 Signed 2020-11-30 2020-11-26 2020-12-07 2020-11-30 2021-01-11 2021-02-13 2021-07-10 inability of National Conserv and CITES at ANAC ation Institutions Component 1: Strengthening 93/MOZBIO/NCS/2020 / Hirin Capacity and Financial Susta Request for Quota Single Stage - One E Pending Impl g Service Provider to Organiz IDA / D3720 Post Limited 35,000.00 0.00 2021-01-23 2021-03-20 2021-09-16 inability of National Conserv tions nvelope ementation e ANAC Event ation Institutions Component 1: Strengthening 94/MOZBIO/NCS/2020 / Hirin Capacity and Financial Susta Request for Quota Single Stage - One E g a company to production a IDA / D3720 Post Limited 25,000.00 14,186.20 Signed 2021-02-03 2020-01-07 2021-03-31 2020-01-30 2021-09-27 inability of National Conserv tions nvelope nd copy of reports ation Institutions 97/MOZBIO/NCS/2020 / Rest Component 2: Improving Co Request for Quota Single Stage - One E ructuring of the ANAC Data N IDA / D3720 nservation Areas Manageme Post Limited 11,000.00 0.00 Canceled 2020-12-07 2021-02-01 2021-07-31 tions nvelope etwork nt in target landscapes 105/NCS/MOZBIO/2021 / Hiri Component 1: Strengthening ng a company to provide ser Capacity and Financial Susta Request for Quota Single Stage - One E IDA / D3720 Post Limited 35,000.00 23,075.83 Signed 2021-05-05 2021-04-09 2021-06-30 2021-04-17 2021-12-27 vices for organizing an ANAC inability of National Conserv tions nvelope event in the Limpopo Nationa ation Institutions l Park Component 1: Strengthening 108/NCS/MOZBIO/21 / Hiring Capacity and Financial Susta Request for Quota Single Stage - One E a Service Provider for Printin IDA / D3720 Post Limited 100,000.00 63,107.41 Signed 2021-08-23 2021-06-30 2021-10-18 2021-07-08 2022-04-16 inability of National Conserv tions nvelope g and Copying Reports ation Institutions 113/NCS/MOZBIO/DS/2021 / Component 3: Promoting co Implementation of the herdin nservation-compatible rural IDA / D3720 Post Direct Selection Direct 700,000.00 662,850.00 Signed 2022-01-30 2021-12-01 2022-02-04 2022-02-16 2022-03-11 2022-03-02 2022-09-07 g 4 health initiative in the Ele development and integrated phant Cost Landscape landscape management in t arget landscapes Page 3 117/NCS/MOZBIO/DS/2022 / Component 1: Strengthening ANAC integrated data manag Capacity and Financial Susta Request for Quota Single Stage - One E IDA / D3720 Post Limited 32,000.00 0.00 Canceled 2022-03-15 2022-05-10 2022-11-06 ement and web information g inability of National Conserv tions nvelope eneration system and hostin ation Institutions g. 123/NCS/MOZBIO/DS/2022 / Component 2: Improving Co Acquisition and supply of Ani IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 143,000.00 143,000.00 Signed 2022-05-16 2022-04-25 2022-05-21 2022-04-25 2022-06-25 2022-05-31 2022-12-22 mals in Maputo National Park nt in target landscapes . 117A/NCS/MOZBIO/DS/2022 Component 1: Strengthening / ANAC integrated data mana Capacity and Financial Susta IDA / D3720 Post Direct Selection Direct 32,000.00 44,488.29 Signed 2022-05-31 2022-06-16 2022-06-05 2022-06-16 2022-07-10 2022-04-30 2023-01-06 gement and web information inability of National Conserv generation system and hosti ation Institutions ng. Component 3: Promoting co 115/NCS/MOZBIO/RFQ/2021 nservation-compatible rural Request for Quota Single Stage - One E / Soil sample analysis service IDA / D3720 Post Limited 10,000.00 12,046.80 Signed 2022-06-05 2021-12-20 2022-07-31 2022-03-21 2023-01-27 development and integrated tions nvelope s in the Licuati region landscape management in t arget landscapes 157/NCS/MOZBIO/RFQ/2023 Component 1: Strengthening / Production of the Environm Capacity and Financial Susta Request for Quota Single Stage - One E Pending Impl IDA / D3720 Post Limited 65,000.00 0.00 2023-09-04 2023-10-30 2024-04-27 ental Education Congress Ev inability of National Conserv tions nvelope ementation ent. ation Institutions CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 17/MOZBIO/CS/18 / Consulta Component 2: Improving Co Consultant Qualifi ncy for stakeholders training IDA / D3720 nservation Areas Manageme Post Open - National 164,700.00 0.00 Canceled 2018-12-31 2019-01-21 2019-03-06 2019-04-05 2019-05-10 2019-11-06 cation Selection for Biofund nt in target landscapes 37/MOZBIO/CS/19 / Plan and Component 2: Improving Co Quality Based Sel design key infrastructures for IDA / D3720 nservation Areas Manageme Post Open - National 100.00 0.00 Canceled 2019-07-30 2019-05-16 2019-08-20 2019-10-03 2019-12-03 2019-10-31 2019-12-10 2019-11-30 2020-02-20 2019-12-30 2020-02-03 2021-02-02 ection the Marromeu National Reser nt in target landscapes ve 03/MOZBIO/CS/18 / Design o Component 1: Strengthening f a PDUTs and Detailed Plan ( Capacity and Financial Susta Quality And Cost- Open - Internationa IDA / D3720 Post 618,000.00 0.00 Canceled 2019-04-15 2019-05-06 2019-06-19 2019-07-17 2019-08-16 2019-09-20 2019-10-25 2020-10-24 Marromeu and Chimanimani l inability of National Conserv Based Selection l andscapes) ation Institutions 45/MOZBIO/CS/2019 / Super Component 2: Improving Co Consultant Qualifi vision works of Road Improve IDA / D3720 nservation Areas Manageme Post Open - National 50,000.00 0.00 Canceled 2019-08-25 2019-09-15 2019-10-29 2019-11-28 2020-01-02 2020-06-30 cation Selection ment Works of 4.1 Km at RE nt in target landscapes M. Component 1: Strengthening 03/MOZBIO/CS/19-1 / Design Capacity and Financial Susta Quality And Cost- of a PDUTs and Detailed Plan IDA / D3720 Post Open - National 365,000.00 210,245.17 Signed 2019-09-09 2019-09-24 2019-09-30 2019-10-25 2019-11-13 2020-01-31 2019-12-11 2020-03-23 2020-01-10 2020-04-14 2020-02-14 2020-08-03 2020-03-20 2020-08-21 2021-03-20 inability of National Conserv Based Selection of Chimanimani landscapes ation Institutions 48/MOZBIO/EMERG/CS/19 / S Component 2: Improving Co upervision Works for infrastr Consultant Qualifi IDA / D3720 nservation Areas Manageme Post Open - National 180,000.00 0.00 Canceled 2019-09-30 2019-10-21 2019-12-04 2020-01-03 2020-02-07 2020-08-05 ucture construction in chima cation Selection nt in target landscapes nimani national reserve Component 3: Promoting co 60/MOZBIO/CS/2020 / Desig nservation-compatible rural Quality And Cost- n of a PDUTs and Detailed Pl IDA / D3720 Post Open - National 365,000.00 234,218.74 Signed 2020-04-30 2020-02-24 2020-05-21 2020-04-06 2020-07-04 2020-06-18 2020-08-01 2020-08-13 2020-08-31 2020-09-09 2020-10-05 2020-10-09 2020-11-09 2021-01-30 2021-11-09 development and integrated Based Selection an of Marromeu landscapes landscape management in t arget landscapes 13/MOZBIO/CS/18 / Consulta Component 2: Improving Co Consultant Qualifi ncy for ecosystem services a IDA / D3720 nservation Areas Manageme Post Open - National 62,700.00 0.00 Canceled 2020-11-30 2020-12-21 2021-02-03 2021-03-05 2021-04-09 2021-10-06 cation Selection ssessment (water services) B nt in target landscapes IOFUND 44/MOZBIO/CS/2019 / Super Component 2: Improving Co Consultant Qualifi vision works for Improvemen IDA / D3720 nservation Areas Manageme Post Open - National 50,000.00 0.00 Canceled 2019-08-12 2020-02-18 2019-09-02 2020-04-14 2019-10-16 2019-11-15 2019-12-20 2020-06-17 cation Selection t of 4.1 km of access roads in nt in target landscapes the REM 33/MOZBIO/CS/2019 / Hiring Component 3: Promoting co a Service Provider to promot nservation-compatible rural Least Cost Selecti IDA / D3720 Post Open - National 76,000.00 0.00 Canceled 2019-03-26 2019-04-11 2019-04-16 2019-05-30 2019-12-20 2019-06-27 2020-03-30 2019-07-27 2019-08-31 2019-10-05 2020-04-02 e savings and revolving credi development and integrated on t groups (PCRs) in the Maput landscape management in t o landscape arget landscapes 33-1/MOZBIO/CS/2019 / Hiri Component 3: Promoting co ng a Service Provider to pro nservation-compatible rural Consultant Qualifi IDA / D3720 Post Limited 76,000.00 125,787.32 Signed 2020-06-30 2020-06-12 2020-07-14 2020-08-19 2020-08-13 2021-02-28 2020-09-17 2021-02-26 2021-03-16 moter saving and revolving c development and integrated cation Selection redit groups (PCR) in the Map landscape management in t uto Landscape arget landscapes 74/MOZBIO/CS/2020 / Super vision of Rehabilitation and I Component 2: Improving Co Consultant Qualifi mprovement of Buildings in t IDA / D3720 nservation Areas Manageme Post Open - National 100,000.00 128,299.91 Signed 2020-08-18 2020-07-22 2020-09-08 2020-08-25 2020-10-22 2020-11-27 2020-11-21 2021-05-02 2020-12-26 2021-05-14 2021-06-24 cation Selection he Special Reserve of Maput nt in target landscapes o and Partial Marine Reserve of Ponta do Ouro. 37-1/MOZBIO/CS/19 / Plan a Component 2: Improving Co Quality Based Sel nd Design Key Infrastructure IDA / D3720 nservation Areas Manageme Post Open - National 100,000.00 88,276.48 Signed 2020-08-14 2019-05-16 2020-09-04 2020-10-18 2019-10-21 2020-11-15 2019-12-10 2020-12-15 2020-02-20 2021-01-14 2020-03-30 2021-02-18 2020-04-03 2022-02-18 ection s for Marromeu National Res nt in target landscapes erve 88/CS/MOZBIO/20 / Supervis Component 2: Improving Co Consultant Qualifi ion of the infrastructure work IDA / D3720 nservation Areas Manageme Post Open - National 80,000.00 129,597.66 Signed 2020-11-02 2020-11-24 2020-11-23 2021-01-06 2021-07-20 2021-02-05 2021-10-15 2021-03-12 2021-10-31 2021-09-08 cation Selection s of the Chimanimani Nation nt in target landscapes al Park Component 1: Strengthening 100/MOZBIO/CS/21 / Functio Capacity and Financial Susta Quality And Cost- nal Analysis and Mid Term Re IDA / D3720 Post Open - National 300,000.00 128,389.67 Signed 2021-03-15 2021-02-22 2021-04-05 2021-03-16 2021-05-19 2021-05-10 2021-06-16 2021-09-05 2021-07-16 2021-08-31 2021-08-20 2021-09-27 2021-09-24 2021-10-21 2022-09-24 inability of National Conserv Based Selection view of ANAC's Strategic Plan ation Institutions 111/CS/MOZBIO/2021 / Prep Component 2: Improving Co Quality And Cost- aration of the integrated dev IDA / D3720 nservation Areas Manageme Post Open - National 250,000.00 0.00 Signed 2021-12-30 2021-10-25 2022-01-20 2022-02-09 2022-03-05 2022-02-09 2022-04-02 2022-03-14 2022-05-02 2022-05-24 2022-06-06 2022-06-24 2022-07-11 2023-07-11 Based Selection elopment plan for APA nt in target landscapes 152/CS/MOZBIO/QCBS/2023 / Hiring a Consultancy Servic Component 1: Strengthening es to evaluate and Identify M Capacity and Financial Susta Quality And Cost- Under Implement echanisms to Valorisation the IDA / D3720 Post Open - National 200,000.00 0.00 2023-03-31 2023-02-28 2023-04-21 2023-03-14 2023-06-02 2023-06-26 2023-07-23 2023-08-27 2023-10-01 2024-09-30 inability of National Conserv Based Selection ation Benefits of the Ecosystems S ation Institutions ervices of the National Syste m of Conservation Areas of M ozambique Page 4 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Component 1: Strengthening 27/MOZBIO/IC/2018 / Procur Capacity and Financial Susta Individual Consult IDA / D3720 Prior Limited 24,000.00 0.00 Canceled 2019-01-10 2019-01-15 2019-01-15 2019-02-14 2019-02-05 2019-03-12 2019-09-08 ement officer for biofund inability of National Conserv ant Selection ation Institutions 29/MOZBIO/IC/19 / Hiring of Component 2: Improving Co Consultant to revise the Man Individual Consult IDA / D3720 nservation Areas Manageme Post Open 50,000.00 45,502.51 Signed 2019-03-01 2019-02-27 2019-04-22 2019-05-24 2019-05-13 2019-05-24 2019-06-17 2019-06-10 2019-10-15 agement Plan of the Chimani ant Selection nt in target landscapes mani National Reserve 31/MOZBIO/IC/19 / Assess th Component 2: Improving Co Individual Consult e health status of buffalos he IDA / D3720 nservation Areas Manageme Post Open 70,000.00 67,014.11 Signed 2019-03-01 2019-02-27 2019-04-22 2019-05-23 2019-05-13 2019-06-10 2019-06-17 2019-06-11 2019-12-14 ant Selection rds of the of Marromeu Comp nt in target landscapes lex 30/MOZBIO/IC/19 / Planning Component 2: Improving Co and Drawing of key manage Individual Consult IDA / D3720 nservation Areas Manageme Post Open 80,000.00 104,369.68 Signed 2019-03-01 2019-03-05 2019-04-22 2019-03-22 2019-05-13 2019-06-05 2019-06-17 2019-06-28 2020-02-12 ment infrastructure for Chim ant Selection nt in target landscapes animani National Reserve 32/MOZBIO/IC/2019 / Consul Component 1: Strengthening tancy for the preparation of a Capacity and Financial Susta Individual Consult IDA / D3720 Post Limited 20,000.00 0.00 Canceled 2019-03-27 2019-04-01 2019-04-22 2019-05-27 2019-11-23 strategy for the training of tr inability of National Conserv ant Selection ainees ation Institutions 34/MOZBIO/CS/2019 / Hiring Component 3: Promoting co a Service Provider to promot nservation-compatible rural e savings and revolving credi IDA / D3720 development and integrated Post Direct Selection Direct 152,000.00 101,365.20 Signed 2019-03-29 2019-03-27 2019-04-08 2019-07-04 2019-06-12 2019-07-23 2019-12-09 t groups (PCRs) in Chimanim landscape management in t ani, Marromeu Landscapes arget landscapes Component 1: Strengthening 19/MOZBIO/CS/18 / Consulta Capacity and Financial Susta Individual Consult ncy for capacity assessment IDA / D3720 Post Open 30,900.00 0.00 Canceled 2018-12-19 2019-02-05 2019-02-26 2019-04-02 2019-09-29 inability of National Conserv ant Selection of ANAC system ation Institutions 12/MOZBIO/IC/18 / Consulta Component 2: Improving Co Individual Consult ncy for the development of pi / nservation Areas Manageme Post Limited 82,500.00 0.00 Canceled 2018-11-29 2018-12-04 2018-12-25 2019-01-29 2019-07-28 ant Selection lot projects BIOFUND nt in target landscapes 18/MOZBIO/CS/18 / Consulta Component 2: Improving Co Individual Consult ncy for the development of pi IDA / D3720 nservation Areas Manageme Post Open 82,400.00 0.00 Canceled 2018-11-30 2019-01-18 2019-02-08 2019-03-15 2019-09-11 ant Selection lot projects For Biofund nt in target landscapes 16/MOZBIO/CS/18 / Consulta Component 2: Improving Co Individual Consult ncy for the development of M IDA / D3720 nservation Areas Manageme Post Open 42,900.00 0.00 Canceled 2018-11-29 2019-01-17 2019-02-07 2019-03-14 2019-09-10 ant Selection &E Guidelines For Biofund nt in target landscapes 10/MOZBIO/IC/18 / Consulta Component 2: Improving Co Individual Consult ncy for the development of bi / nservation Areas Manageme Post Limited 16,000.00 0.00 Canceled 2019-01-31 2019-02-05 2019-02-26 2019-04-02 2019-09-29 ant Selection odiversity offsets guidelines nt in target landscapes BIOFUND Component 2: Improving Co 04/MOZBIO/IC/18 / Review of Individual Consult / nservation Areas Manageme Post Open 52,000.00 0.00 Canceled 2019-01-28 2019-03-18 2019-04-08 2019-05-13 2019-11-09 the Management Plan of REM ant Selection nt in target landscapes 36/MOZBIO/ICS/19 / Biodiver Component 2: Improving Co Under Implement sity survey at the Chimanima IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 31,000.00 0.00 2019-05-22 2019-03-28 2019-06-01 2019-08-05 2020-02-01 ation ni National Reserve nt in target landscapes 09/MOZBIO/IC/18 / Buffalo P Component 2: Improving Co Individual Consult opulation Vet Study in Marro / nservation Areas Manageme Post Limited 72,100.00 0.00 Canceled 2019-01-30 2019-02-04 2019-02-25 2019-04-01 2019-09-28 ant Selection meu nt in target landscapes 36/MOZBIO/DS/19 / Preparat Component 2: Improving Co ion of the documents for sub IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 94,000.00 100,000.00 Signed 2019-04-30 2019-05-02 2019-05-10 2019-05-21 2019-07-14 2019-07-28 2020-01-10 mission of the application of nt in target landscapes MSR and PPMR as a World He ritage Site 28/MOZBIO/IC/19 / Biodiversi Component 1: Strengthening ty Metrics: assessing magrov Capacity and Financial Susta Individual Consult IDA / D3720 Post Open 15,000.00 0.00 Canceled 2019-02-27 2019-02-22 2019-04-17 2019-05-08 2019-06-12 2019-12-09 e forest ecological condition i inability of National Conserv ant Selection n Mozambique ation Institutions 11/MOZBIO/IC/18 / Consulta Component 2: Improving Co Individual Consult ncy for stakeholders training / nservation Areas Manageme Post Direct 30,000.00 0.00 Canceled 2018-10-30 2018-11-19 2018-11-09 2018-11-30 2019-01-04 2019-07-03 ant Selection SAPA nt in target landscapes 28/MOZBIO/DS/19 / Contract Component 2: Improving Co ing a firm to execute a range IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 150,000.00 0.00 Canceled 2019-03-01 2019-02-27 2019-03-11 2019-05-15 2020-05-14 r training evaluation and patr nt in target landscapes ol leaders training 28/MOZBIO/DS/19-2 / Contra Component 2: Improving Co cting a firm to execute a ran IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 460,000.00 458,770.00 Signed 2019-05-13 2019-05-23 2019-05-23 2019-03-11 2019-07-27 2019-05-30 2020-07-26 ger training evaluation and p nt in target landscapes atrol leaders training Component 1: Strengthening 46/MOZBIO/IC/19 / Elaborati Capacity and Financial Susta Individual Consult IDA / D3720 Post Limited 60,000.00 64,000.00 Signed 2019-09-17 2019-09-08 2019-09-22 2019-09-23 2019-10-13 2019-10-09 2019-11-17 2019-10-17 2020-05-15 on of final report of MOZBIO I inability of National Conserv ant Selection ation Institutions 49/BIOFUND/IC/19 / Elaborat Component 1: Strengthening ion of Legal Device for Regul Capacity and Financial Susta IDA / D3720 Post Direct Selection Direct 20,000.00 0.00 Canceled 2019-08-28 2019-08-29 2019-09-07 2019-11-11 2020-05-09 ation of Mitigation Hierarchy inability of National Conserv and Biodiversity Counterbala ation Institutions nces in Mozambique 53/MOZBIO/IC/19 / ASSESSIN G INVASIVE SPECIES STATUS Component 1: Strengthening AND DEVELOP A RESTORATI Capacity and Financial Susta Individual Consult IDA / D3720 Post Limited 25,000.00 0.00 Canceled 2019-09-30 2019-10-06 2019-10-27 2019-12-01 2020-02-29 ON STRATEGY & MANAGEME inability of National Conserv ant Selection NT PLAN FOR MAPUTO SPECI ation Institutions AL RESERVE (REM), MOZAMB IQUE Page 5 54/MOZBIO/IC/19 / Develop and support the implementat Component 2: Improving Co Individual Consult ion of plans to mitigate huma IDA / D3720 nservation Areas Manageme Post Limited 80,000.00 143,540.00 Signed 2019-10-30 2019-10-01 2019-11-04 2019-10-14 2019-11-25 2019-12-17 2019-12-30 2020-02-29 2020-07-27 ant Selection n wildlife conflicts in the land nt in target landscapes scapes of Marromeu, Chiman imani and Maputo. 56/MOZBIO/IC/19 / Hiring Ind Component 1: Strengthening ividual Consultant for Evaluat Capacity and Financial Susta Individual Consult IDA / D3720 Post Limited 35,000.00 35,000.00 Signed 2019-10-30 2019-10-20 2019-11-04 2019-10-23 2019-11-25 2019-10-30 2019-12-30 2019-11-01 2020-06-27 ion of Community componen inability of National Conserv ant Selection t of MOZBIO I ation Institutions Component 1: Strengthening 59/MOZBIO/IC/2020 / Procur Capacity and Financial Susta Individual Consult IDA / D3720 Prior Open 48,000.00 0.00 Canceled 2020-02-27 2020-03-26 2020-04-16 2021-05-27 2020-05-07 2020-06-11 2020-12-08 ement Officer for ANAC inability of National Conserv ant Selection ation Institutions Component 1: Strengthening 14/MOZBIO/IC/18 / Marketin Capacity and Financial Susta Individual Consult g strategy design consultanc IDA / D3720 Post Open 83,600.00 0.00 Canceled 2020-12-21 2021-02-08 2021-03-01 2021-04-05 2021-10-02 inability of National Conserv ant Selection y for ANAC ation Institutions Component 1: Strengthening 64/MOZBIO/IC/2020 / Procur Capacity and Financial Susta Individual Consult IDA / D3720 Prior Limited 24,000.00 31,683.17 Signed 2020-06-15 2020-10-20 2020-06-20 2020-10-29 2020-07-11 2020-12-22 2020-08-15 2021-01-12 2021-02-11 ement Officer for Biofund inability of National Conserv ant Selection ation Institutions 55/MOZBIO/IC/2019 / Hiring I Component 1: Strengthening ndividual consult for Update Capacity and Financial Susta Individual Consult IDA / D3720 Post Limited 12,500.00 0.00 Canceled 2019-11-28 2019-11-28 2019-12-03 2019-12-24 2020-01-28 2020-07-26 of Ivory and Rhino National A inability of National Conserv ant Selection ction Plan (NIRAP) ation Institutions 15/MOZBIO/W/18 / Consulta Component 2: Improving Co Individual Consult ncy for Training in database IDA / D3720 nservation Areas Manageme Post Open 20,000.00 0.00 Canceled 2019-05-29 2019-07-17 2019-08-07 2019-09-11 2020-03-09 ant Selection development for ANAC nt in target landscapes Component 1: Strengthening 69/IC/MOZBIO/2020 / Techni Capacity and Financial Susta Individual Consult cal assistance for Minister of IDA / D3720 Post Limited 72,000.00 72,000.00 Signed 2020-07-07 2020-06-10 2020-07-12 2020-07-06 2020-08-02 2020-07-22 2020-09-06 2020-07-25 2021-03-05 inability of National Conserv ant Selection Land and Environment ation Institutions 71/MOZBIO/IC/2020 / Superv Component 2: Improving Co Individual Consult ison Works for Improvement IDA / D3720 nservation Areas Manageme Post Limited 30,000.00 28,356.48 Signed 2020-06-30 2020-06-18 2020-07-05 2020-07-02 2020-07-26 2020-07-24 2020-08-30 2020-07-15 2021-02-26 ant Selection of 4.1 Km of Access Roads in nt in target landscapes MSR 72/MOZBIO/IC/2020 / Hiring Component 2: Improving Co Safeguard for Supervision W Individual Consult IDA / D3720 nservation Areas Manageme Post Limited 20,000.00 19,787.60 Signed 2020-06-30 2020-06-18 2020-07-05 2020-07-02 2020-07-26 2020-07-24 2020-08-30 2020-08-15 2021-02-26 orks for Improvement of 4.1 ant Selection nt in target landscapes Km of Access Roads in MSR Component 2: Improving Co 70/IC/MOZBIO/2020 / Techni Individual Consult IDA / D3720 nservation Areas Manageme Post Direct 140,000.00 140,000.00 Signed 2020-07-28 2020-06-24 2020-08-07 2020-07-24 2020-08-28 2020-07-06 2020-10-02 2020-07-09 2021-03-31 cal assistance for ANAC ant Selection nt in target landscapes 84/MOZBIO/CS/20 / HIRING A Component 1: Strengthening FIRM TO CARRYING OUT THE Capacity and Financial Susta IDA / D3720 Post Direct Selection Direct 27,700.00 0.00 Signed 2020-11-23 2020-08-19 2020-12-13 2022-10-30 2021-02-16 2021-08-15 DIAGNOSIS OF TRAINING NEE inability of National Conserv DS ASSESSMENT OF SNAC PR ation Institutions OFESSIONALS 78/MOZBIO/CS/20 / Develop Component 3: Promoting co ment of Business Plans for S nservation-compatible rural mall Emerging Commercial E IDA / D3720 development and integrated Post Direct Selection Direct 90,000.00 109,029.00 Signed 2020-09-29 2020-08-26 2020-10-09 2020-09-15 2020-12-13 2020-11-29 2021-06-11 ntrepreneurs (PECE) within t landscape management in t he scope of SUSTENTA BIO Fi arget landscapes nancing Opportunities 85/MOZBIO/IC/20 / Hiring a Component 1: Strengthening Consultant to Prepare the Str Capacity and Financial Susta Individual Consult IDA / D3720 Post Open 50,000.00 0.00 Signed 2020-09-29 2020-09-18 2020-11-17 2022-11-15 2020-12-08 2022-11-15 2021-01-12 2021-07-11 ategic Action Plan for Comm inability of National Conserv ant Selection unity Development in Conser ation Institutions vation Areas 87/CS/MOZBIO/20 / Strength ening functional and efficient Component 2: Improving Co community governance mec IDA / D3720 nservation Areas Manageme Post Direct Selection Direct 400,000.00 1,245,683.29 Signed 2020-12-01 2020-09-18 2020-12-16 2020-10-07 2021-02-19 2021-04-01 2021-08-18 hanisms in the landscapes of nt in target landscapes Marromeu, Chimanimani and the Elephant Coast Component 1: Strengthening 95/MOZBIO/IC/2020 / Procur Capacity and Financial Susta Individual Consult IDA / D3720 Prior Open 120,000.00 39,484.80 Signed 2021-02-22 2021-02-25 2021-04-12 2021-06-02 2021-05-03 2021-09-21 2021-06-07 2021-10-01 2021-12-04 ement Specialist for Mozbio inability of National Conserv ant Selection ation Institutions Component 1: Strengthening 104/BIOFUND/IC/21 / Project Capacity and Financial Susta Individual Consult Officer for the Biodiversity Of IDA / D3720 Post Limited 20,000.00 0.00 Canceled 2021-03-28 2021-03-18 2021-04-02 2021-04-07 2021-04-23 2021-05-28 2021-11-24 inability of National Conserv ant Selection fset Program ation Institutions 103/BIOFUND/IC/21 / Evaluat Component 2: Improving Co Individual Consult ion of Invasive Species in RE IDA / D3720 nservation Areas Manageme Post Limited 20,000.00 0.00 Canceled 2021-03-31 2021-03-19 2021-04-05 2021-04-26 2021-05-31 2021-11-27 ant Selection M nt in target landscapes 68/IC/MOZBIO/2020 / Techni Component 2: Improving Co Individual Consult cal assistance for chimanima IDA / D3720 nservation Areas Manageme Post Open 100,000.00 0.00 Canceled 2020-06-30 2020-06-18 2020-08-18 2021-02-02 2020-09-08 2020-10-13 2021-04-11 ant Selection ni infrastructures nt in target landscapes 107/DS/MOZBIO/2021 / Provi Component 3: Promoting co der of Technical Assistance, nservation-compatible rural Under Implement IDA / D3720 Post Direct Selection Direct 220,000.00 0.00 2021-05-28 2021-06-17 2021-06-07 2021-08-11 2022-02-07 Training and Operationalizati development and integrated ation on Services for PIUs landscape management in t arget landscapes Component 1: Strengthening 106/IC/MOZBIO/2021 / Hiring Capacity and Financial Susta Individual Consult IDA / D3720 Prior Open 72,000.00 0.00 Canceled 2021-06-30 2021-10-01 2021-09-19 2021-10-10 2021-11-14 2022-05-13 a Lawyer for ANAC inability of National Conserv ant Selection ation Institutions Component 1: Strengthening 109/IC/MOZBIO/2021 / Procu Capacity and Financial Susta Individual Consult IDA / D3720 Prior Open 48,000.00 0.00 Canceled 2021-07-30 2021-09-22 2021-09-17 2021-10-08 2021-11-12 2022-05-11 rement Officer for ANAC inability of National Conserv ant Selection ation Institutions Component 1: Strengthening 110/IC/MOZBIO/2021 / FNDS Capacity and Financial Susta Individual Consult IDA / D3720 Post Open 48,000.00 0.00 Canceled 2021-11-10 2021-12-08 2021-12-29 2022-01-19 2022-02-23 2022-08-22 Staff Manager inability of National Conserv ant Selection ation Institutions Page 6 Component 1: Strengthening 112/IC/MOZBIO/2021 / Desig Capacity and Financial Susta Individual Consult n of a pilot electronic visa sy IDA / D3720 Post Limited 250,000.00 0.00 Canceled 2022-01-20 2021-12-15 2022-01-25 2021-12-20 2022-02-15 2022-03-22 2022-09-18 inability of National Conserv ant Selection stem for Mozambique ation Institutions Component 1: Strengthening 118/CS/MOZBIO/ICS/2022 / P Capacity and Financial Susta Individual Consult rocurement Specialist for Mo IDA / D3720 Prior Open 60,000.00 150,000.00 Terminated 2022-02-04 2022-02-02 2022-03-25 2022-03-18 2022-04-15 2022-03-24 2022-05-20 2022-04-09 2022-11-16 inability of National Conserv ant Selection zBIO. ation Institutions 124/CS/MOZBIO/IC/2022 / Hi Component 2: Improving Co Individual Consult ring a Conservation Assistant IDA / D3720 nservation Areas Manageme Post Open 20,000.00 0.00 Canceled 2022-05-30 2022-05-18 2022-07-18 2022-08-08 2022-09-12 2023-03-11 ant Selection of Maputo National Park. nt in target landscapes 125/CS/MOZBIO/IC/2022 / Hi Component 1: Strengthening ring a Consultant for the desi Capacity and Financial Susta Individual Consult gn, layout and development IDA / D3720 Post Limited 1,000.00 0.00 Signed 2022-05-31 2022-05-19 2022-06-05 2022-05-26 2022-06-26 2022-11-15 2022-07-31 2023-01-27 inability of National Conserv ant Selection of community protection ma ation Institutions nuals, with duration of two m onths. 121/CS/MOZBIO/IC/2022 / Hi Component 2: Improving Co Individual Consult ring an Officer conservation TF / B4664 nservation Areas Manageme Post Open 33,000.00 0.00 Canceled 2022-05-31 2022-05-19 2022-07-19 2022-08-09 2022-09-13 2023-03-12 ant Selection of National Park of Maputo. nt in target landscapes Component 3: Promoting co 129/CS/MOZBIO/ICS/2022 / E nservation-compatible rural Individual Consult lephant Coast Landscape Co IDA / D3720 Post Open 110,000.00 0.00 Canceled 2022-07-03 2022-06-27 2022-08-21 2022-09-11 2022-10-16 2023-04-14 development and integrated ant Selection ordinator landscape management in t arget landscapes Component 1: Strengthening 130/CS/MOZBIO/ICS/2022 / R Capacity and Financial Susta Individual Consult estoration Officer for the 3 Pr IDA / D3720 Post Open 110,000.00 0.00 Canceled 2022-07-03 2022-06-27 2022-08-21 2022-09-11 2022-10-16 2023-04-14 inability of National Conserv ant Selection oject Target Landscapes ation Institutions Component 3: Promoting co 131/CS/MOZBIO/ICS/2022 / E nservation-compatible rural Individual Consult lephant Coast Landscape Co IDA / D3720 Post Limited 110,000.00 120,000.00 Signed 2022-07-15 2022-07-20 2022-07-20 2022-07-20 2022-08-10 2022-09-09 2022-09-14 2022-09-29 2023-03-13 development and integrated ant Selection ordinator landscape management in t arget landscapes Component 1: Strengthening 132/CS/MOZBIO/ICS/2022 / R Capacity and Financial Susta Individual Consult estoration Officer for the 3 Pr IDA / D3720 Post Limited 110,000.00 0.00 Signed 2022-07-15 2022-07-20 2022-07-20 2022-07-20 2022-08-10 2022-09-08 2022-09-14 2023-03-13 inability of National Conserv ant Selection oject Target Landscapes ation Institutions 133/CS/MOZBIO/ICS/2022 / E Component 1: Strengthening valuation of the functioning o Capacity and Financial Susta Individual Consult IDA / D3720 Post Limited 45,000.00 0.00 Signed 2022-07-15 2022-07-22 2022-07-20 2022-08-12 2022-08-10 2022-10-09 2022-09-14 2023-03-13 f the business unit and its su inability of National Conserv ant Selection pport for ANAC's financial sus ation Institutions tainability Component 3: Promoting co 134/CS/MOZBIO/IC/2022 / Hi nservation-compatible rural Individual Consult ring a Rural Extension Officer IDA / D3720 Post Open - National 22,000.00 0.00 Canceled 2022-08-26 2022-08-23 2022-10-14 2022-11-04 2022-12-09 2023-06-07 development and integrated ant Selection for 12 months. landscape management in t arget landscapes 135/CS/MOZBIO/IC/2022 / Hi Component 3: Promoting co ring of Safeguard Officer for nservation-compatible rural Individual Consult IDA / D3720 Post Open - National 36,000.00 0.00 Signed 2022-09-30 2022-08-24 2022-11-18 2022-12-30 2022-12-09 2022-12-30 2023-01-13 2023-07-12 Elephant Coast Landscape fo development and integrated ant Selection r 12 month. landscape management in t arget landscapes 139/CS/MOZBIO/IC/2022 / hir Component 3: Promoting co ing an Accounting and Financ nservation-compatible rural Individual Consult IDA / D3720 Post Limited 56,000.00 0.00 Signed 2022-10-30 2022-10-11 2022-11-04 2022-11-23 2022-11-25 2023-01-23 2022-12-30 2023-06-28 e Officer of the Marromeu La development and integrated ant Selection ndscape. landscape management in t arget landscapes 140/CS/MOZBIO/DS/2022 / E Component 3: Promoting co xpansion of PCR groups in th nservation-compatible rural IDA / D3720 Post Direct Selection Direct - National 150,000.00 0.00 Signed 2022-11-30 2022-10-18 2022-12-10 2022-12-09 2023-02-13 2023-08-12 e Marromeu and Chimanima development and integrated n landscapes. landscape management in t arget landscapes 141/CS/MOZBIO/IC/2022 / In Component 1: Strengthening dividual Consultancy for the Capacity and Financial Susta Individual Consult Under Implement IDA / D3720 Post Open - National 50,000.00 0.00 2022-12-16 2022-11-18 2023-03-06 2023-03-27 2023-05-01 2023-10-28 Environmental and Social Au inability of National Conserv ant Selection ation dit of the Project ation Institutions Component 3: Promoting co 142/CS/MOZBIO/IC/2022 / Ru nservation-compatible rural Individual Consult Under Implement ral Extension Officer for the IDA / D3720 Post Limited 20,000.00 0.00 2022-12-30 2022-11-30 2023-01-29 2023-01-17 2023-02-19 2023-03-07 2023-03-26 2023-09-22 development and integrated ant Selection ation Marromeu Landscape landscape management in t arget landscapes 144/CS/MOZBIO/IC/2022 / Hi Component 2: Improving Co Individual Consult Under Implement ring a Safeguards officer for IDA / D3720 nservation Areas Manageme Post Open - National 60,000.00 0.00 2023-01-30 2022-12-09 2023-04-05 2023-04-04 2023-04-26 2023-05-31 2023-11-27 ant Selection ation Chimanimani Landscape. nt in target landscapes Component 1: Strengthening 145/CS/MOZBIO/IC/2023 / Hi Capacity and Financial Susta Individual Consult Under Implement ring of a CITES Officer for AN IDA / D3720 Post Open - National 24,000.00 0.00 2023-03-31 2023-01-25 2023-05-19 2023-06-09 2023-07-14 2024-01-10 inability of National Conserv ant Selection ation AC ation Institutions Component 1: Strengthening 146/CS/MOZBIO/IC/2023 / Hi Capacity and Financial Susta Individual Consult Under Implement ring of a second CITES Office IDA / D3720 Post Open - National 24,000.00 0.00 2023-03-31 2023-01-25 2023-05-19 2023-06-09 2023-07-14 2024-01-10 inability of National Conserv ant Selection ation r for ANAC ation Institutions 150/CS/MOZBIO/IC/2023 / D Component 3: Promoting co evelopment of Environmental nservation-compatible rural Individual Consult Under Implement IDA / D3720 Post Open - National 100,000.00 0.00 2023-02-28 2023-01-25 2023-04-18 2023-04-20 2023-05-09 2023-06-13 2023-12-10 and Social Safeguards Docu development and integrated ant Selection ation ments for Bio-communities In landscape management in t vestment Initiatives arget landscapes 151/CS/MOZBIO/IC/2023 / El Component 1: Strengthening aboration of NDFs report for t Capacity and Financial Susta Individual Consult Under Implement TF / B4664 Post Open - National 50,000.00 0.00 2023-02-28 2023-01-25 2023-04-18 2023-04-10 2023-05-09 2023-05-03 2023-06-13 2023-12-10 he exportation of Umbila, Ch inability of National Conserv ant Selection ation anfuta and Umbaua species, ation Institutions 153/CS/MOZBIO/IC/2023 / Hi Component 1: Strengthening ring a Procurement Specialist Capacity and Financial Susta Individual Consult Under Implement TF / B4664 Prior Open - National 130,000.00 0.00 2023-03-30 2023-03-03 2023-05-18 2023-06-08 2023-07-13 2024-01-09 for 18 months based in Mapu inability of National Conserv ant Selection ation to FNDS.. ation Institutions 154/CS/MOZBIO/IC/2023 / Hi Component 3: Promoting co ring of individual consultancy nservation-compatible rural Individual Consult Under Implement IDA / D3720 Post Open - National 55,000.00 0.00 2023-03-31 2023-03-09 2023-05-25 2023-06-15 2023-07-20 2024-01-16 services to assess the impact development and integrated ant Selection ation of promoting Savings and Ro landscape management in t tating Credit groups arget landscapes Page 7 Component 1: Strengthening 155/CS/MOZBIO/IC/2023 / Hi Capacity and Financial Susta Individual Consult Under Implement ring an IT Technician for ANA IDA / D3720 Post Open - National 38,000.00 0.00 2023-04-30 2023-03-15 2023-06-24 2023-07-15 2023-08-19 2024-02-15 inability of National Conserv ant Selection ation C ation Institutions 156/CS/MOZBIO/IC/23 / Eval Component 3: Promoting co uation of initiatives funded b nservation-compatible rural Individual Consult Under Implement IDA / D3720 Post Open - National 60,000.00 0.00 2023-04-30 2023-03-17 2023-06-18 2023-07-09 2023-08-13 2024-02-09 y Sustenta Bio and Emergenc development and integrated ant Selection ation e Tourism landscape management in t arget landscapes Page 8 PROCUREMENT PLAN (Textual Part) Project information: Pakistan Pandemic Response Effectiveness Project (P173796) Project Implementation agency: (i) Ministry of National Health Services, Regulations and Coordination; (ii) National Disaster Management Authority (iii) Benazir Income Support Programme and; (iv) Provincial EPI Cells Date of the Procurement Plan: April 13, 2020 Period covered by this Procurement Plan: April-2020 to June 2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, Revised November 2017 and August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Public Procurement Rules 2004, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions: 1) The eligibility of bidders shall be as defined under Section III of the Procurement Regulations. Accordingly, no bidder or potential bidder shall be declared ineligible for contracts financed by the Bank for reasons other than those provided in Section III of the Procurement Regulations. 2) For national open competitive procurement, only the model procurement documents acceptable to the World Bank, shall be used. 3) The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance (in the form attached) at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti-Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. 4) Procurement Documents include provisions, as agreed with the Bank, intended to adequately mitigate against environmental, social (including sexual exploitation and abuse and gender-based violence), health and safety (“ESHS”) risks and impacts 5) Access to procurement opportunities shall not be restricted to firms that have pre-registered and/or paid a registration fee. 6) No preference of any kind shall be given to national bidders in the bidding process. When other national procurement arrangements (other than national open competitive procurement) are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. Other Relevant Procurement Information. Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. are applicable Letter of Acceptance of the World Bank’s Anticorruption Guidelines and Sanctions Framework1 Date: Invitation of Bids/Proposals No.__________ To: ___________________________________________________________________________ We, along with our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not) consultants and personnel, acknowledge and agree to abide by the World Bank’s policy regarding Fraud and Corruption (corrupt, fraudulent, collusive, coercive, and obstructive practices), as set out and defined in the World Bank’s Anti-Corruption Guidelines2 in connection with the procurement and execution of the contract (in case of award), including any amendments thereto. We declare and warrant that we, along our sub-contractors, sub-consultants, service providers, suppliers, agents (whether declared or not), consultants and personnel, are not subject to, and are not controlled by any entity or individual that is subject to, a temporary suspension, early temporary suspension, or debarment imposed by a member of the World Bank Group, including, inter alia, a cross-debarment imposed by the World Bank Group as agreed with other international financial institutions (including multilateral development banks), or through the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement. Further, we are not ineligible under the laws or official regulations of [Insert name of Employer as per bidding document] or pursuant to a decision of the United Nations Security Council. We confirm our understanding of the consequences of not complying with the World Bank’s Anti-Corruption Guidelines, which may include the following: a. rejection of our Proposal/Bid for award of contract; 1[Drafting note: This document shall be signed by bidders/proposers/consultants and submitted as part of their bids/proposals. In addition, this document shall be signed by the winning bidder/consultant and incorporated as part of the contract.] 2Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by International Bank for Reconstruction and Development Loans and the International Development Agency Credits and Grants, dated October 15, 2006, and revised in January 2011 and July 2016, as they may be revised from time to time. b. in the case of award, termination of the contract, without prejudice to any other remedy for breach of contract; and c. sanctions, pursuant to the Bank’s Anti-Corruption Guidelines and in accordance with its prevailing sanctions policies and procedures as set forth in the Bank’s Sanctions Framework. This may include a public declaration of ineligibility, either indefinitely or for a stated period of time, (i) to be awarded or otherwise benefit from a Bank-financed contract, financially or in any other manner;3 (ii) to be a nominated4 sub-contractor, sub-consultant, consultant, manufacturer or supplier, or service provider of an otherwise eligible firm being awarded a Bank-financed contract; and (iii) to receive the proceeds of any loan made by the Bank or otherwise to participate further in the preparation or implementation of any Bank- financed project. We understand that we may be declared ineligible as set out above upon: a. completion of World Bank Group sanctions proceedings according to its prevailing sanctions procedures; b. cross-debarment as agreed with other international financial institutions (including multilateral development banks); c. the application of a World Bank Group finding of non-responsibility on the basis of Fraud and Corruption in connection with World Bank Group corporate procurement; or d. temporary suspension or early temporary suspension in connection with an ongoing World Bank Group sanctions proceeding. For avoidance of doubt, the foregoing effects of ineligibility do not extend to a sanctioned firm’s or individual’s execution of its ongoing Bank-financed contracts (or its ongoing sub-agreements under such contracts) that are not the subject of a material modification, as determined by the Bank. We shall permit, and shall cause our sub-contractors, sub-consultants, agents (whether declared or not), personnel, consultants, service providers or suppliers, to permit the Bank to inspect5 all accounts, records, and other documents relating to 3 For the avoidance of doubt, a sanctioned party’s ineligibility to be awarded a contract shall include, without limitation, (i) applying for pre-qualification or initial selection), expressing interest in a consultancy, and bidding, either directly or as a nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider, in respect of such contract, and (ii) entering into an addendum or amendment introducing a material modification to any existing contract. 4A nominated sub-contractor, nominated consultant, nominated manufacturer or supplier, or nominated service provider (different names are used depending on the bidding document) is one which has been: (i) included by the bidder in its pre-qualification or initial selection application or bid because it brings specific and critical experience and know-how that allow the bidder to meet the qualification requirements for the particular bid; or (ii) appointed by the Borrower. 5Inspections in this context are usually investigative (i.e., forensic) in nature: they involve fact- finding activities undertaken by the Bank or persons appointed by the Bank to address specific the procurement process and/or contract execution (in the case of award), and to have them audited by auditors appointed by the Bank. We agree to preserve all accounts, records, and other documents (whether in hard copy or electronic format) related to the procurement and execution of the contract. Name of the Bidder/Proposer/Consultant: Name of the person duly authorized to sign the Bid/Proposal on behalf of the Bidder/Proposer/ Consultant: Title of the person signing the Letter: matters related to investigations/audits, such as evaluating the veracity of an allegation of possible Fraud and Corruption, through the appropriate mechanisms. Such activity includes but is not limited to accessing and examining a firm's or individual's financial records and information, and making copies thereof as relevant; accessing and examining any other documents, data, and information (whether in hard copy or electronic format) deemed relevant for the investigation/audit, and making copies thereof as relevant; interviewing staff and other relevant individuals; performing physical inspections and site visits; and obtaining third-party verification of information. PROCUREMENT Pakistan : PANDEMIC RESPONSE EFFECTIVENESS IN PAKISTAN PLAN General Information Country: Pakistan 2022-06-20 Bank’s Approval Date of the Original Procurement Plan: 2023-05-22 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173796 GPN Date: 2020-04-20 Project Name: PANDEMIC RESPONSE EFFECTIVENESS IN PAKISTAN Loan / Credit No: IDA / 65900 Ministry of Federal Education and Professional Training Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-MOFEPT-300476-GO-RFB / Procurement of relevant eq uipment for AIOU on lot-wise basis for transmission of DL c hannels. The categories are: Component 2. Mitigation of Open - Internationa Single Stage - One E 1. Earth Station Uplink & Ser IDA / 65900 Post Request for Bids 1,480,000.00 0.00 Canceled 2022-09-19 2023-02-23 2022-09-22 2023-02-26 2022-11-07 2023-03-17 2022-11-21 2022-11-25 2023-05-31 Disruptive Impacts l nvelope ver Development 2. Upgradation of Existing Fa cilities 3. Establishment of Studio 4. Post-Production Assets 3. Up PK-MOFEPT-327308-GO-RFB / Procurement of Handheld D Component 2. Mitigation of Single Stage - One E evices (Chromebooks) for stu IDA / 65900 Prior Request for Bids Open - National 3,250,000.00 0.00 Canceled 2022-12-12 2023-02-13 2022-12-16 2023-02-13 2023-01-17 2023-03-08 2023-01-27 2023-01-31 2023-06-30 Disruptive Impacts nvelope dents and teachers under Dis tance Learning initiatives of MOFEPT. PK-MOFEPT-327311-GO-RFB / Hiring of a firm to provide e Component 2. Mitigation of Single Stage - One E IDA / 65900 Prior Request for Bids Open - National 1,700,000.00 0.00 Canceled 2022-12-05 2023-03-10 2022-12-09 2023-04-03 2023-01-10 2023-04-17 2023-01-20 2023-01-31 2023-06-30 nd-to-end implementation of Disruptive Impacts nvelope "School on Wheels" activity. PK-MOFEPT-330116-GO-RFB / Establishment of 400 Smart Component 3. Implementati Classrooms in selected instit Single Stage - One E Under Imple IDA / 65900 on Management and Monitor Post Request for Bids Open - National 1,250,000.00 0.00 2022-12-16 2023-02-21 2022-12-19 2023-01-18 2023-04-10 2023-01-27 2023-05-08 2023-01-31 2023-06-30 utions of Islamabad Capital T nvelope mentation ing and Evaluation erritory (ICT), Azad, Jammu & Kashmir (AJK) and Gilgit-Balti stan (GB). PK-MOFEPT-330115-GO-RFB / Establishment of Virtual Tea Component 3. Implementati Single Stage - One E cher training platform for tea IDA / 65900 on Management and Monitor Post Request for Bids Open - National 975,000.00 0.00 Canceled 2022-12-15 2022-12-21 2023-01-20 2023-01-27 2023-01-31 2023-06-30 nvelope chers including development ing and Evaluation of a dedicated Mobile App an d Website PK-MOFEPT-332164-GO-DIR / Hiring of "PTCL" for develop ment of a dedicated Mobile A Component 3. Implementati Under Imple pp and Website as an e-learn IDA / 65900 on Management and Monitor Post Direct Selection Direct - National 650,000.00 0.00 2022-12-26 2023-01-20 2022-12-30 2023-03-06 2023-01-13 2023-06-30 mentation ing solution for teachers and ing and Evaluation students including Virtual Te acher training (VTT) platform and LMS. PK-MOFEPT-332166-GO-RFB Component 3. Implementati / Sourcing of Teachers' Traini Single Stage - One E Under Imple IDA / 65900 on Management and Monitor Post Request for Bids Open - National 190,000.00 0.00 2022-12-30 2023-02-16 2023-01-05 2023-01-26 2023-03-07 2023-02-10 2023-02-20 2023-05-31 ng Content for Virtual Teache nvelope mentation ing and Evaluation rs' Training (VTT) module PK-MOFEPT-335516-GO-RFQ Component 4. Contingent E / Refurbishment of Two Existi Request for Quota Single Stage - One E IDA / 65900 mergency Response Compo Post Open - National 65,000.00 0.00 Signed 2023-01-12 2023-02-01 2023-03-10 ng Buses at Federal Director tions nvelope nent ate of Education for Conversi on into Mobile Schools. PK-MOFEPT-344018-GO-RFB / Procurement of Distance Le Component 2. Mitigation of Single Stage - One E IDA / 65900 Prior Request for Bids Open - National 1,806,000.00 0.00 Canceled 2023-02-20 2023-02-23 2023-03-14 2023-03-21 2023-03-27 2023-06-30 arning Content for Grade KG Disruptive Impacts nvelope to Grade 12 under PREP. PK-MOFEPT-349937-GO-RFB / Procurement and Developm Component 2. Mitigation of Single Stage - One E Under Imple IDA / 65900 Prior Request for Bids Open - National 1,806,000.00 0.00 2023-03-17 2023-04-07 2023-03-21 2023-04-09 2023-04-11 2023-04-17 2023-04-21 2023-06-30 ent of Distance Learning Con Disruptive Impacts nvelope mentation tent for Grades KG-12 under PREP. PK-MOFEPT-355504-GO-RFB / Establishment of Television Channels on Turnkey Basis w ith Provisioning and Commiss Component 2. Mitigation of Single Stage - One E IDA / 65900 Prior Request for Bids Open - National 5,000,000.00 0.00 Canceled 2023-04-11 2023-04-17 2023-04-13 2023-04-17 2023-04-28 2023-05-04 2023-05-03 2023-05-08 2023-06-30 ioning of Hardware, Software Disruptive Impacts nvelope and Installation of All the Req uired Equipment, Accessories , Electrical & Access Controls at Allama Iqbal Open Univers ity (AIOU) PK-MOFEPT-362836-GO-DIR / Procurement of Chromeboo Component 2. Mitigation of Direct - Internation IDA / 65900 Prior Direct Selection 2,750,000.00 0.00 Canceled 2023-05-22 2023-05-28 2023-05-23 2023-06-01 2023-05-29 2023-06-30 ks for Supplies at School Lev Disruptive Impacts al el across Pakistan. PK-MOFEPT-366470-GO-RFB Component 4. Contingent E / Procurement of LED Screen Single Stage - One E Under Revie IDA / 65900 mergency Response Compo Prior Request for Bids Limited 2,666,667.00 0.00 2023-06-10 2023-06-13 2023-06-11 2023-06-16 2023-06-19 2023-06-20 2023-06-30 s for Federal Directorate of E nvelope w nent ducation (FDE) Schools PK-MOFEPT-366476-GO-RFB Component 4. Contingent E / Procurement of Laptops (lot Single Stage - One E Under Revie IDA / 65900 mergency Response Compo Prior Request for Bids Limited 3,312,781.00 0.00 2023-06-10 2023-06-13 2023-06-11 2023-06-16 2023-06-19 2023-06-20 2023-06-30 -1), Desktops (lot-2) and Clic nvelope w nent kers(lot-3) for FDE schools. Page 1 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-MOFEPT-326600-NC-RFB / Hiring of a Survey Firm for Component 2. Mitigation of Single Stage - One E IDA / 65900 Post Request for Bids Open - National 264,000.00 0.00 Signed 2022-11-21 2022-11-15 2022-11-21 2022-12-07 2022-12-07 2022-12-12 2023-01-04 2022-12-15 2023-03-31 Administration of Summative Disruptive Impacts nvelope Testing and Surveys in KPK P ublic Schools PK-MOFEPT-329384-NC-DIR / Component 4. Contingent E Engagement with PTV for Tra IDA / 65900 mergency Response Compo Post Direct Selection Direct - National 850,000.00 0.00 Signed 2022-12-01 2022-12-01 2022-12-02 2022-11-30 2022-12-05 2023-06-30 nsmission of "Tele School" nent PK-MOFEPT-344017-NC-RFQ Component 3. Implementati / Hiring of a firm to run a ded Request for Quota Single Stage - One E IDA / 65900 on Management and Monitor Post Open - National 74,600.00 0.00 Signed 2023-02-21 2023-02-28 2023-03-31 icated communication campa tions nvelope ing and Evaluation ign for launch of MoFEPT's Te leschool App. PK-MOFEPT-357389-NC-RFQ Component 3. Implementati Request for Quota Single Stage - One E / Communication & Dissemin IDA / 65900 on Management and Monitor Post Open - National 67,685.00 0.00 Signed 2023-05-02 2023-05-15 2023-06-30 tions nvelope ation Campaign under PREP. ing and Evaluation PK-MOFEPT-363615-NC-RFQ / Hiring of fIrm to provide logi Component 3. Implementati Request for Quota Single Stage - One E Under Imple stics, event management an IDA / 65900 on Management and Monitor Post Open - National 80,000.00 0.00 2023-05-26 2023-06-08 2023-06-30 tions nvelope mentation d communications services f ing and Evaluation or the "National Learning Co nference" CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-MOFEPT-325096-CS-CQS / Hiring of firm to supervise s Component 2. Mitigation of Consultant Qualifi ourcing and installation of rel IDA / 65900 Post Open - National 225,000.00 0.00 Signed 2022-11-04 2022-11-04 2022-11-24 2022-12-05 2022-12-15 2022-12-12 2023-01-04 2022-12-17 2023-06-30 Disruptive Impacts cation Selection evant equipment and facilitie s at AIOU for running 04 dedi cated channels. PK-MOFEPT-326076-CS-QCB Component 1. Emergency C S / Communications and Outr Quality And Cost- IDA / 65900 OVID-19 Preparedness and R Prior Open - National 1,650,000.00 0.00 Canceled 2022-11-11 2022-11-16 2022-11-30 2022-12-12 2023-04-06 2023-01-11 2023-03-27 2023-01-20 2023-04-12 2023-01-30 2023-01-31 2023-06-30 each Campaign under Pande Based Selection esponse mic Response Effectiveness P roject (PREP). PK-MOFEPT-326940-CS-CQS / Hiring of Consulting Service Component 3. Implementati Consultant Qualifi s for "Rapid Assessment and IDA / 65900 on Management and Monitor Post Open - National 60,000.00 0.00 Canceled 2022-12-05 2022-12-23 2023-01-06 2023-01-12 2023-01-16 2023-06-30 cation Selection Mapping" to provide learning ing and Evaluation about MoFEPT learning conti nuation activities PK-MOFEPT-326943-CS-QCB S / Procurement and develop Component 2. Mitigation of Quality And Cost- IDA / 65900 Prior Open - National 1,806,000.00 0.00 Canceled 2022-12-05 2022-12-23 2023-01-07 2023-02-07 2023-02-15 2023-02-23 2023-02-26 2023-06-30 ment of distance learning co Disruptive Impacts Based Selection ntent for Grade KG-Grade 12 under PREP. PK-MOFEPT-300484-CS-LCS / Hiring of firm to supervise so Component 2. Mitigation of Least Cost Selecti IDA / 65900 Post Open - National 225,000.00 0.00 Canceled 2022-09-15 2022-09-16 2022-10-06 2022-10-14 2022-10-17 2022-10-17 2022-10-17 2022-10-21 2023-06-30 urcing and installation of rele Disruptive Impacts on vant equipment and facilities at AIOU. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-MOFEPT-316197-CS-CDS / HIRING OF ALLAMA IQBAL O Component 3. Implementati PEN UNIVERSIT (AIOU) FOR S IDA / 65900 on Management and Monitor Post Direct Selection Direct - National 300,000.00 0.00 Signed 2022-09-16 2022-08-17 2022-09-21 2022-08-10 2022-09-27 2023-06-30 USTAINIBILITY OF DISTANCE ing and Evaluation LEARNING INITIATIVES INCLU DING TELE-SCHOOL. PK-MOFEPT-300488-CS-INDV Component 1. Emergency C Individual Consult IDA / 65900 Post Open 66,000.00 0.00 Canceled 2022-06-24 2022-07-01 2022-07-26 2022-07-28 2022-08-01 2023-06-30 / Hiring of "Project Director" OVID-19 Preparedness and R ant Selection esponse PK-MOFEPT-335676-CS-INDV Component 3. Implementati / Hiring of "Project Coordinati Individual Consult Under Implement IDA / 65900 on Management and Monitor Post Open - National 26,500.00 0.00 2023-01-12 2023-01-18 2023-01-27 2023-02-03 2023-01-30 2023-02-07 2023-01-31 2023-06-30 on Consultant" for Program C ant Selection ation ing and Evaluation oordination Unit, M/o FE & PT . Page 2