PROCUREMENT PLAN (Textual Part) Project information: Burundi Colline Climate Resilience Project (P180864) Project Implementation agency: Ministry of The Environment, Agriculture and Livestock - Burundi Colline Climate Resilience Project -BCCRP Date of the Procurement Plan: August 23, 2023 Period covered by this Procurement Plan: August 2023 – April 2024 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Country Procurement Handbook, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. - The request for bids/request for proposals document shall require that Bidders/Proposers submitting Bids/Proposals present a signed acceptance at the time of bidding to be incorporated in any resulting contracts, confirming application of, and compliance with, the Bank’s Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights. - Rights for the Bank to review procurement documentation and activities. - An effective complaints mechanism. - Maintenance of records of the Procurement Process When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Not Applicable. Works: Not Applicable. Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Not Applicable. Other Relevant Procurement Information: Nothing Significant to Report (NSTR).. PROCUREMENT Burundi : Burundi Colline Climate Resilience Project PLAN General Information Country: Burundi Bank’s Approval Date of the Original Procurement Plan: 2023-08-27 Revised Plan Date(s): (comma delineated, leave blank if 2024-06-28 none) Project ID: P180864 GPN Date: Project Name: Burundi Colline Climate Resilience Project Loan / Credit No: IDA / V4870 Ministry of the Environment, Agriculture and Livestock - Burundi Colline Climate Resilience Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MINEAGRIE-BCCR PIU-384 862-NC-DIR / Fourniture, inst Passation de marc Direct - Internation En cours d'ex IDA / V4870 A posteriori 40,527.00 0.00 2023-10-25 2023-11-10 2023-10-30 2023-11-14 2023-12-04 2024-06-01 allation et paramétrage du lo hé de gré à gré al écution giciel de comptabilité TOM2P ROV2 WEB CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MINEAGRIE-BCCR PIU-376 353-CS-CDS / Etudes de Fais Sélection fondée s abilité Techniques et élabora Open - Internationa En cours d'exécut IDA / V4870 A posteriori ur la qualité et le 1,394,415.00 0.00 2023-08-31 2023-08-28 2023-09-21 2023-09-05 2023-11-04 2023-11-03 2023-12-02 2023-12-14 2024-01-01 2024-02-09 2024-02-05 2024-03-11 2025-03-11 tion d’un plan d’action climat l ion coût ique collinaire sur les collines et bassins versants cibles de la zone du PRCCB BI-MINEAGRIE-BCCR PIU-388 964-CS-CQS / Recrutement d' un cabinet chargé d'une éval Sélection fondée s Open - Internationa En cours d'exécut uation des capacités instituti IDA / V4870 A posteriori ur les qualification 50,000.00 0.00 2023-11-24 2023-10-28 2023-12-15 2023-11-10 2024-01-28 2024-05-04 2024-02-27 2024-04-02 2024-09-29 l ion onnelles des partenaires de s des consultants mises en œuvre des activités du projet PRCCB en cours de préparation BI-MINEAGRIE-BCCR PIU-401 300-CS-CQS / Recrutement d' Sélection fondée s un cabinet/firme pour l'établi Open - Internationa En attente d'exéc IDA / V4870 A posteriori ur la qualité et le 428,860.00 0.00 2024-02-27 2024-03-19 2024-05-02 2024-05-30 2024-06-29 2024-08-03 2024-09-07 2025-09-07 ssement de la situation de ba l ution coût se référentielle et d'Un plan de Suivi&Evaluation du PRCC B BI-MINEAGRIE-BCCR PIU-428 267-CS-QCBS / Recrutement Sélection fondée s Open - Internationa En attente d'exéc d'une ONG en charge de l'éla IDA / V4870 A posteriori ur la qualité et le 576,000.00 0.00 2024-05-31 2024-06-21 2024-08-04 2024-09-01 2024-10-01 2024-11-05 2024-12-10 2025-12-10 l ution boration et mise en oeuvre d coût es plans d'action climatique c ollinaires (PACC) BI-MINEAGRIE-BCCR PIU-435 997-CS-QCBS / Recrutement d'une ONG chargée d'élabore Sélection fondée s r et de mettre en œuvre les p Open - Internationa En attente d'exéc IDA / V4870 A posteriori ur la qualité et le 576,000.00 0.00 2024-07-25 2024-08-15 2024-09-28 2024-10-26 2024-11-25 2024-12-30 2025-02-03 2026-02-03 lans d'actions climatiques col l ution coût linaires (PACC) dans le cadre du Projet de Résilience Clima tique des Collines du Burundi (PRCCB) BI-MINEAGRIE-BCCR PIU-436 009-CS-LCS / Audit financier Sélection au moin Open - Internationa En attente d'exéc et comptable du PRCCB/Avan IDA / V4870 A posteriori 10,000.00 0.00 2024-07-05 2024-07-26 2024-09-08 2024-10-06 2024-11-05 2024-12-10 2025-01-14 2025-07-13 dre coût l ution ce de préparation du projet e xercices du 1er septembre 2 023 au 30 juin 2024 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BI-MINEAGRIE-BCCR PIU-381 184-CS-INDV / Recrutement d'un Consultant Individuel po En cours d'exécut IDA / V4870 A posteriori Individuel Open - National 43,369.00 0.00 2023-10-02 2023-10-18 2023-11-20 2024-01-03 2023-12-11 2024-03-12 2024-01-15 2024-07-13 ur l'élaboration du Cadre de ion Gestion Environnementale et Sociale (CGES) dans le cadre de la préparation du PRCCB BI-MINEAGRIE-BCCR PIU-381 187-CS-INDV / Recrutement d'un Consultant Individuel ch En cours d'exécut IDA / V4870 A posteriori Individuel Open - National 20,000.00 0.00 2023-10-02 2023-10-26 2023-11-20 2024-01-03 2023-12-11 2024-03-12 2024-01-15 2024-07-13 argé de l'élaboration du Cadr ion e de Politique de Réinstallati on (CPR) dans le cadre de la préparation du PRCCB Page 1 BI-MINEAGRIE-BCCR PIU-381 189-CS-INDV / Recrutement d'un Consultant Individuel ch En cours d'exécut argé de l'élaboration du Cadr IDA / V4870 A posteriori Individuel Open - National 20,000.00 0.00 2023-10-02 2023-10-13 2023-11-20 2024-01-11 2023-12-11 2024-03-01 2024-01-15 2024-07-13 ion e de Planification en faveur d es Peuples Autochtones (CPP A) dans le cadre de la prépar ation du PRCCB BI-MINEAGRIE-BCCR PIU-381 173-CS-CDS / Recrutement p ar Entente Directe de la Firm e SHER pour l’élaboration de Sélection de cons En cours d'exécut s études de faisabilité techni IDA / V4870 A posteriori ultants par entent Direct - National 80,000.00 0.00 2023-09-18 2023-09-20 2023-09-28 2023-09-29 2023-12-02 2024-05-30 ion ques d’un bassin versant et d e directe ’une colline prototypes dans l e cadre de la préparation du Projet de Résilience Climatiq ue du Burundi (PRCCB) BI-MINEAGRIE-BCCR PIU-384 864-CS-INDV / Recrutement En cours d'exécut d'un comptable de l'Unité de IDA / V4870 A posteriori Individuel Open - National 10,788.51 0.00 2023-10-20 2023-10-23 2023-12-08 2023-12-29 2024-02-02 2024-07-31 ion préparation du Projet de Rési lience Climatique des collines du Burundi (UPP-PRCCB) BI-MINEAGRIE-BCCR PIU-388 866-CS-INDV / Recrutement d'un Consultant individuel ch IDA / V4870 A posteriori Individuel Open - National 23,600.00 0.00 Annulé 2023-11-15 2023-10-28 2024-01-03 2024-01-24 2024-02-28 2024-08-26 argé de l'élaboration d'un pla n de mobilisation des parties prenantes (PMPP) dans le ca dre du PRCCB BI-MINEAGRIE-BCCR PIU-388 869-CS-INDV / Recrutement d'un Consultant individuel po IDA / V4870 A posteriori Individuel Open - National 20,000.00 0.00 Annulé 2023-11-20 2023-10-28 2024-01-08 2024-01-29 2024-03-04 2024-08-31 ur l'élaboration d'un Plan de Gestion de la Main d'œuvre ( PGMO) dans le cadre du proj et PRCC en préparation BI-MINEAGRIE-BCCR PIU-388 956-CS-INDV / Recrutement d'un Consultant individuel po En cours d'exécut ur l'élaboration d'un Manuel IDA / V4870 A posteriori Individuel Open - National 20,000.00 0.00 2023-11-17 2023-11-28 2024-01-05 2024-01-26 2024-03-01 2024-08-28 ion des procédures de gestion ad ministrative, financière et co mptable du projet PRCCB en préparation BI-MINEAGRIE-BCCR PIU-388 999-CS-INDV / Recrutement d'un Consultant individuel ch En cours d'exécut argé de l'évaluation des risqu IDA / V4870 A posteriori Individuel Open - National 18,000.00 0.00 2023-11-30 2023-10-28 2024-01-18 2024-01-31 2024-02-08 2024-03-01 2024-03-14 2024-09-10 ion es des violences basées sur l e genre, d'exploitation et abu s sexuels et de harcèlement sexuel BI-MINEAGRIE-BCCR PIU-389 880-CS-INDV / Recrutement d'un Consultant individuel ch En cours d'exécut IDA / V4870 A posteriori Individuel Open - National 20,000.00 0.00 2023-11-30 2023-11-27 2024-01-18 2024-02-08 2024-03-14 2024-09-10 argé de l'élaboration d'un Ma ion nuel des Procédures de Pass ation des Marchés pour le pr ojet PRCCB en préparation BI-MINEAGRIE-BCCR PIU-399 846-CS-INDV / Relance du re crutement d'un Consultant in En cours d'exécut IDA / V4870 A posteriori Individuel Limited 20,000.00 0.00 2024-01-09 2024-01-11 2024-01-14 2024-05-04 2024-02-04 2024-03-29 2024-03-10 2024-09-06 dividuel pour l'élaboration d' ion un Plan de Gestion de la Mai n d'œuvre (PGMO) dans le ca dre du projet PRCC en prépar ation BI-MINEAGRIE-BCCR PIU-399 850-CS-INDV / Relance recrut ement d'un Consultant indivi En cours d'exécut IDA / V4870 A posteriori Individuel Limited 23,600.00 0.00 2024-01-15 2024-01-11 2024-01-20 2024-05-04 2024-02-10 2024-03-29 2024-03-16 2024-09-12 duel chargé de l'élaboration ion d'un plan de mobilisation des parties prenantes (PMPP) dan s le cadre du PRCCB BI-MINEAGRIE-BCCR PIU-401 299-CS-INDV / Recrutement En attente d'exéc d'un Consultant individuel po IDA / V4870 A posteriori Individuel Open - National 20,000.00 0.00 2024-02-28 2024-04-17 2024-05-08 2024-06-12 2024-12-09 ution ur une évaluation sociale ave c une perspective de genre BI-MINEAGRIE-BCCR PIU-401 302-CS-INDV / Recrutement En attente d'exéc d'un Consultant individuel po IDA / V4870 A posteriori Individuel Open - National 56,680.00 0.00 2024-02-15 2024-04-04 2024-04-25 2024-05-30 2024-11-26 ution ur l'étude d'impact environne mental et social du PRCCB BI-MINEAGRIE-BCCR PIU-401 303-CS-INDV / Recrutement En attente d'exéc IDA / V4870 A posteriori Individuel Open - National 20,000.00 0.00 2024-02-20 2024-04-09 2024-04-30 2024-06-04 2024-12-01 d'un Consultant individuel po ution ur l'élaboration du Cadre fon ctionnel du PRCCB BI-MINEAGRIE-BCCR PIU-414 324-CS-INDV / Recrutement, En cours d'exécut par entente directe , de Mad IDA / V4870 A posteriori Individuel Direct - National 13,013.27 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 ion ame Odette KAYITESI au post e de Coordonnateur de l'UPP- PRCCB BI-MINEAGRIE-BCCR PIU-414 329-CS-INDV / Recrutement, par entente directe, de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 9,410.75 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Jean Claude MASABO au ion poste de Spécialiste en Gesti on Financière à l'UPP-PRCCB BI-MINEAGRIE-BCCR PIU-414 336-CS-INDV / Recrutement , par entente directe de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Ferdinand NDERAGAKUR ion A au poste de Spécialiste en Restauration des Paysages (S RP) à l'UPP-PRCCB BI-MINEAGRIE-BCCR PIU-414 337-CS-INDV / Recrutement, par entente directe, de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-12 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Jonathan HATUNGIMANA ion au poste de Spécialiste en Sa uvegardes Environnementale et Sociale à l'UPP-PRCCB Page 2 BI-MINEAGRIE-BCCR PIU-414 353-CS-INDV / Recrutement, par entente directe, de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Emmanuel RUFYIKIRI au ion poste de Spécialiste en Produ ctivité Agricole (SPA) à l'UPP- PRCCB BI-MINEAGRIE-BCCR PIU-414 355-CS-INDV / Recrutement, En cours d'exécut par entente directe, de Mada IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 ion me Clarette INAMAHORO au poste de Spécialiste en Com munication à l'UPP-PRCCB BI-MINEAGRIE-BCCR PIU-414 358-CS-INDV / Recrutement, par entente directe, de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Félicien HATUNGIMANA a ion u poste de Spécialiste en Cer tification Foncière (SCF) à l'U PP-PRCCB BI-MINEAGRIE-BCCR PIU-414 361-CS-INDV / Recrutement, En cours d'exécut par entente directe, de Monsi IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 ion eur Balthazar BARAYANDEMA au poste d'Auditeur Interne ( AI) à l'UPP-PRCCB BI-MINEAGRIE-BCCR PIU-414 367-CS-INDV / Recrutement, par entente directe de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Prosper BARAKAMFITIYE, ion au poste de Coordonnateur d e l'Unité Provinciale de Buju mbura BI-MINEAGRIE-BCCR PIU-414 381-CS-INDV / Recrutement, En cours d'exécut par entente directe de Monsi IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 ion eur Joseph NAHAYO, au poste de Coordonnateur de l'Unité Provinciale de Muyinga BI-MINEAGRIE-BCCR PIU-414 383-CS-INDV / Recrutement, par entente directe, de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 8,629.96 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Déogratias SIMBAVIMBE ion RE au poste de Spécialiste en Passation des Marchés N°1 à l'UPP-PRCCB BI-MINEAGRIE-BCCR PIU-414 385-CS-INDV / Recrutement, par entente directe, de Mada En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 8,629.96 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 me Aude TEGERIMANA au po ion ste de Spécialiste en Passatio n des Marchés N°2 à l'UPP-PR CCB BI-MINEAGRIE-BCCR PIU-414 388-CS-INDV / Recrutement, par entente directe, de Mada En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 8,451.54 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 me Léonie NIYONKURU au po ion ste de Spécialiste en Genre e t Inclusion Sociale à l'UPP-PR CCB BI-MINEAGRIE-BCCR PIU-414 594-CS-INDV / Recrutement, par entente directe, de Mada En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 7,739.39 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 me Béatrice NDONSE au post ion e d’Agent de Suivi-Evaluation au sein de l'Unité Provinciale de Bujumbura BI-MINEAGRIE-BCCR PIU-414 615-CS-INDV / Recrutement, par entente directe de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 7,739.39 0.00 2024-03-18 2024-04-11 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Philippe NTINESHWA au p ion oste d’Agent de Suivi-Evaluat ion au sein de l'Unité Provinci ale de Muyinga BI-MINEAGRIE-BCCR PIU-414 618-CS-INDV / Recrutement, En cours d'exécut par entente directe, de Monsi IDA / V4870 A posteriori Individuel Direct - National 5,436.18 0.00 2024-03-18 2024-04-12 2024-03-28 2024-04-18 2024-05-23 2024-11-19 ion eur Vincent NDAYISHIMIYE au poste de Comptable N°2 à l'U PP-PRCCB BI-MINEAGRIE-BCCR PIU-414 620-CS-INDV / Recrutement, En cours d'exécut par entente directe, de Monsi IDA / V4870 A posteriori Individuel Direct - National 5,436.18 0.00 2024-03-18 2024-04-12 2024-03-28 2024-04-18 2024-05-23 2024-11-19 ion eur Damien NAHIMANA au po ste de Comptable N°1 à l'UPP -PRCCB BI-MINEAGRIE-BCCR PIU-414 622-CS-INDV / Recrutement, par entente directe, de Mada En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 4,092.65 0.00 2024-03-18 2024-04-12 2024-03-28 2024-04-18 2024-05-23 2024-11-19 me Clotilde SINDIHEBURA au ion poste de Secrétaire- Compta ble au sein de l'Unité Provinci ale de Muyinga BI-MINEAGRIE-BCCR PIU-414 624-CS-INDV / Recrutement, par entente directe, de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 4,092.65 0.00 2024-03-18 2024-04-12 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Dieudonné NZOHABONA ion YO au poste de Secrétaire- C omptable au sein de l'Unité P rovinciale de Muyinga BI-MINEAGRIE-BCCR PIU-414 628-CS-INDV / Recrutement, En cours d'exécut par entente directe, de Mada IDA / V4870 A posteriori Individuel Direct - National 4,092.65 0.00 2024-03-18 2024-04-12 2024-03-28 2024-04-18 2024-05-23 2024-11-19 ion me Koudra NDAYISHIMIYE au poste de Secrétaire- Réceptio nniste à l'UPP-PRCCB BI-MINEAGRIE-BCCR PIU-415 351-CS-INDV / Recrutement, par entente directe, de Monsi En cours d'exécut IDA / V4870 A posteriori Individuel Direct - National 7,739.39 0.00 2024-03-18 2024-04-12 2024-03-28 2024-04-18 2024-05-23 2024-11-19 eur Donat MWARURO au post ion e de Consultant junior d’appu i à la préparation du PRCCB Page 3