PROCUREMENT PLAN Project information: Morocco-Resilient and Sustainable Water in Agriculture (P175747) Project Implémentation agency: Office régional de mise en valeur agricole de Tadla Date of the Procurement Plan: June 15, 2022 Period covered by this Procurement Plan: June 2022-Decenber 2023 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Decree No 2-12-349 du 20mars 2013, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. To ensure broad consistency with the Procurement Guidelines, the following provisions will apply when using NCB under this project. Said procedures shall ensure that, inter alia: • The bidding documents include explicitly the bid evaluation method, award criteria and bidder qualification criteria. • Technical, administrative, and financial envelopes are opened immediately after the bid opening session has started and prices are read aloud. • The bids are evaluated based on the price and any other criteria expressed either in pass/fail terms or in monetary terms. • Contracts are awarded to the qualified bidder who has submitted the least-cost evaluated and substantially responsive bid as stipulated in the bidding document; and When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan. Works: is applicable for those contracts identified in the Procurement Plan. PROCUREMENT Morocco : Resilient and Sustainable Water in Agriculture PLAN General Information Country: Morocco 2022-08-29 Bank’s Approval Date of the Original Procurement Plan: 2023-06-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175747 GPN Date: Project Name: Resilient and Sustainable Water in Agriculture Loan / Credit No: IBRD / 93640 Regional Agricultural Development Office Souss Massa Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned MA-ORMVASM-342656-CW-R FB / Travaux de fourniture, in stallation et mise en service Demande d'offres Component 2: Modernization des équipements électriques Single Stage - One E - DTPM Petits trav En cours d'e 2023-12-0 IBRD / 93640 of Irrigation and Drainage se A posteriori Appel d'offres Open - National 4,730,000.00 0.00 2023-02-15 2023-03-10 2023-02-20 2023-04-08 2023-04-03 2023-03-22 2023-05-03 2023-06-07 au niveau du poste de transf nvelope aux - (Processus à xécution 4 rvices ormation 60/5,5 KV desserva 1 enveloppe) nt en énergie électrique la st ation de relevage SP1 de l'O RMVA du Souss Massa MA-ORMVASM-342680-CW-R FB / Travaux de fourniture, in Demande d'offres Component 2: Modernization stallation et mise en service Single Stage - One E - DTPM Petits trav 2023-12-0 IBRD / 93640 of Irrigation and Drainage se A posteriori Appel d'offres Open - National 990,000.00 0.00 Annulé 2023-02-15 2023-03-10 2023-02-20 2023-04-08 2023-04-03 2023-05-03 2023-06-07 des équipements au niveau nvelope aux - (Processus à 4 rvices de l'ouvrage de prise d'eau d 1 enveloppe) e la station de relevage SP1 de l'ORMVA du Souss Massa Demande d'offres MA-ORMVASM-302170-CW-R Component 2: Modernization Single Stage - One E - DTPM Petits trav 14,851,000.0 En attente d 2024-04-0 FB / Réhabilitation du canal d IBRD / 93640 of Irrigation and Drainage se A posteriori Appel d'offres Open - National 0.00 2023-06-15 2023-06-20 2023-08-01 2023-08-31 2023-10-05 nvelope aux - (Processus à 0 'exécution 2 u Massa de l'ORMVA du Sous rvices 1 enveloppe) s Massa MA-ORMVASM-359406-CW-R FB / Travaux de fourniture, in Demande d'offres Component 2: Modernization stallation et mise en service Single Stage - One E - DTPM Petits trav En cours d'e 2024-03-1 IBRD / 93640 of Irrigation and Drainage se A posteriori Appel d'offres Open - National 1,920,000.00 0.00 2023-05-29 2023-06-20 2023-06-03 2023-07-15 2023-08-14 2023-09-18 des équipements au niveau d nvelope aux - (Processus à xécution 6 rvices e l'ouvrage de prise d'eau de 1 enveloppe) la station de relevage SP1 de l'ORMVA du Souss Massa GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MA-ORMVASM-302173-GO-R Component 2: Modernization FB / Fourniture et installation Single Stage - One E En attente d' IBRD / 93640 of Irrigation and Drainage se A posteriori Appel d'offres Open - National 2,783,000.00 0.00 2023-02-13 2023-02-18 2023-04-01 2023-05-01 2023-06-05 2023-12-02 des bornes hydrants (808, 80 nvelope exécution rvices 9) de l'ORMVA du Souss Mass a NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MA-ORMVASM-343709-NC-R Component 2: Modernization FQ / Prestations du bureau d Single Stage - One E IBRD / 93640 of Irrigation and Drainage se A posteriori Demande de prix Open - National 110,000.00 0.00 Annulé 2023-05-24 2023-07-19 2024-01-15 e contrôle des travaux de mo nvelope rvices dernisation du périmètre du Massa MA-ORMVASM-343734-NC-R Component 2: Modernization FQ / Prestations de laboratoir Single Stage - One E IBRD / 93640 of Irrigation and Drainage se A posteriori Demande de prix Open - National 165,000.00 0.00 Annulé 2023-05-24 2023-07-19 2024-01-15 e des travaux de modernisati nvelope rvices on du périmètre du Massa MA-ORMVASM-302177-NC-R FP / Sélection d'un délégatair Component 1: Enhancement e privé en PPP pour la mise e of governance of WIA in a co Single Stage - Two E En attente d' n place et l'exploitation d'un IBRD / 93640 A priori Appel d'offres Open - National 11,000,000.00 0.00 2023-06-30 2023-07-05 2023-10-03 2024-01-20 2028-06-30 ntext of increasing water sc nvelope exécution système de télégestion desti arcity né au suivi et au contrôle des prélèvements d'eau à partir de la nappe de Chtouka MA-ORMVASM-361494-NC-R FB / Prestations du bureau de Component 2: Modernization contrôle technique des trava Single Stage - One E En cours d'ex IBRD / 93640 of Irrigation and Drainage se A posteriori Appel d'offres Open - National 110,000.00 0.00 2023-05-25 2023-05-29 2023-05-30 2023-07-11 2023-06-21 2023-08-10 2023-09-14 2026-05-14 ux de réhabilitation de la stat nvelope écution rvices ion SP1 et des travaux d'irrig ation au niveau du périmètre irrigué du Massa MA-ORMVASM-361488-NC-R FB / Prestations du laboratoir e pour le contrôle de la qualit Component 2: Modernization é des travaux de réhabilitatio Single Stage - One E IBRD / 93640 of Irrigation and Drainage se A posteriori Appel d'offres Open - National 165,000.00 0.00 Annulé 2023-05-25 2023-05-29 2023-05-30 2023-07-11 2023-06-21 2023-08-10 2023-09-14 2026-05-10 n de la station SP1, canal pri nvelope rvices ncipal, réseaux de distributio n, prise d'irrigation individuel les et télégestion au niveau d u périmètre de Massa géré p ar l'ORMVA/SM CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual MA-ORMVASM-302178-CS-Q CBS / assistance technique p our la supervision des travau Component 2: Modernization Sélection fondée s Open - Internationa En cours d'exécut x (Réhabilitation SP1, Canal, IBRD / 93640 of Irrigation and Drainage se A posteriori ur la qualité et le 2,200,000.00 0.00 2023-02-15 2023-02-22 2023-03-08 2023-04-21 2023-05-19 2023-06-18 2023-07-23 2023-08-27 2024-08-26 l ion Prises individuelles, Réseaux rvices coût d'irrigation et la télégestion a u niveau du périmètre du Ma ssa Page 1 MA-ORMVASM-302179-CS-Q Component 2: Modernization Sélection fondée s CBS / Etude de modernisatio En attente d'exéc IBRD / 93640 of Irrigation and Drainage se A posteriori ur la qualité et le Open - National 430,000.00 0.00 2022-11-01 2022-11-22 2023-01-05 2023-02-02 2023-03-04 2023-04-08 2023-05-13 2024-05-12 n des réseaux d'irrigation du ution rvices coût périmètre de Massa MA-ORMVASM-343730-CS-Q Component 1: Enhancement CBS / Assistance technique p Sélection fondée s of governance of WIA in a co Open - Internationa En attente d'exéc our le suivi de la mise en œu IBRD / 93640 A posteriori ur la qualité et le 2,420,000.00 0.00 2023-06-15 2023-07-06 2023-08-19 2023-09-16 2023-10-16 2023-11-20 2023-12-25 2024-12-24 ntext of increasing water sc l ution vre du contrat de délégation coût arcity du PPP de sauvegarde de la nappe de chtouka INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2