PROCUREMENT PLAN (Textual Part) Project Country: Republic of Tajikistan information Full Project Name: TAJIKISTAN RESILIENT IRRIGATION (project preparation) Total Finance ($): USD 0,517 million Project Number: P175356 Project Implementation agency Agency on Land Reclamation and Irrigation Date of the Procurement Plan November 17, 2021 (initial) Period covered by this Procurement Project preparation duration (till Plan: June 30, 2022) Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016, revised November 2017, August 2018, and November 2020) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), procurement under World Bank financed operations may be carried out in accordance with “Tendering with Unlimited Participation” method set forth in the Law of the Republic of Tajikistan “Оn Public Procurement of Goods, Works and Services”, # 168 dated March 3, 2006 (as amended by Law #815, the “Law of the Republic of Tajikistan on “Introduction of Amendments and Additions to the Law of the Republic of Tajikistan on ‘Public Procurement of Goods, Works and Services’” dated April 16, 2012), provided that such arrangements continue to meet requirements of the paragraph 5.4 of the Procurement Regulations and the following conditions: • The request for bids/request for proposals document shall require that bidders/proposers submitting bids/proposals present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of, and compliance with, Bank Anti- Corruption Guidelines, including without limitation the Bank’s right to sanction and the Bank’s inspection and audit rights; • The request for bids/request for proposals document, including contract forms, acceptable to the Bank shall be used. • Borrower shall put in place an effective complaints review mechanism with procurement related complaints, and shall disclose the details in all the bidding documents. All complaints shall be recorded by the Borrower in the appropriate tracking and monitoring system, as agreed between the Bank and the Borrower. • No preference shall be applied under competitive bidding following national market approach. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Other national procurement arrangements such as as tendering with limited participation, request for quotations, direct contracting, may be used on the above stated conditions. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works): “Not Applicable” PROCUREMENT Tajikistan : Tajikistan Strengthening Water and Irrigation Management Project PLAN General Information Country: Tajikistan 2021-11-19 Bank’s Approval Date of the Original Procurement Plan: 2024-06-08 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P175356 GPN Date: 2022-08-22 Project Name: Tajikistan Strengthening Water and Irrigation Management Project Loan / Credit No: / , IDA / E0790 Project Management Unit for the “Fergana Valley Water Resources Management Project” Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SWIM-CW-RFQ-01 / Reconstr Request for Quota uction of administrative build Water Sector Reform and Ins Request for Quota Single Stage - One E Pending Imp 2023-09-2 IDA / E0790 Post Open - National tions (Non Bank-S 150,000.00 0.00 2023-02-04 2023-04-01 ings of the Vakhsh , Shuroba titutional Strengthening tions nvelope lementation 8 PD) d scheme organizations and SDLRI in BHC National Procure SWIM-CW-NCB-03 / Canal O Irrigation Scheme Improvem Single Stage - One E ment Document - 2024-06-2 IDA / E0790 Post Request for Bids Open - National 850,000.00 0.00 Signed 2023-09-04 2023-07-14 2023-09-09 2023-07-14 2023-10-21 2023-08-10 2023-11-20 2023-08-18 2023-12-25 MC ents nvelope 1 Envelope proce 2 ss (Non Bank-SPD ) National Procure SWIM-CW-NCB-04 / Central c Irrigation Scheme Improvem Single Stage - One E ment Document - 2024-07-0 IDA / E0790 Post Request for Bids Open - National 265,000.00 0.00 Canceled 2023-09-20 2023-08-01 2023-09-25 2023-08-01 2023-11-06 2023-08-29 2023-12-06 2023-09-08 2024-01-10 anal system ents nvelope 1 Envelope proce 8 ss (Non Bank-SPD ) National Procure SWIM-CW-NCB-07 / Jilikul Kof Irrigation Scheme Improvem Single Stage - One E ment Document - Pending Imp 2025-02-2 IDA / E0790 Post Request for Bids Open - National 1,340,000.00 0.00 2024-05-06 2024-05-11 2024-06-22 2024-07-22 2024-08-26 ir canal ents nvelope 1 Envelope proce lementation 2 ss (Non Bank-SPD ) Request for Quota SWIM-CW-RFQ-02 / PMU offic Request for Quota Single Stage - One E 2024-08-1 IDA / E0790 Project Management Post Open - National tions (Non Bank-S 65,000.00 0.00 Signed 2023-12-20 2024-02-14 2023-05-23 e renovation tions nvelope 2 PD) National Procure SWIM-CW-NCB-02 / Rehabilit ment Document - ation of head water intake fa Irrigation Scheme Improvem Single Stage - One E Pending Imp 2025-03-0 IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 800,000.00 0.00 2024-05-20 2024-05-25 2024-07-06 2024-08-05 2024-09-09 cilities at PK33 in the system ents nvelope lementation 8 ss (Non Bank-SPD of Vakhsh, Shurabad main ca ) nals National Procure SWIM-CW-NCB-05 / Rehabilit ment Document - ation of the subsystem of the Irrigation Scheme Improvem Single Stage - One E 2025-02-1 IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 2,175,000.00 0.00 Signed 2024-04-29 2023-11-23 2024-05-04 2023-11-24 2024-06-15 2023-12-25 2024-07-15 2023-12-28 2024-08-19 Northern branch in the syste ents nvelope 5 ss (Non Bank-SPD m of the Vakhsh main canal ) National Procure SWIM-CW-NCB-06 / Rehabilit ment Document - ation of the subsystem Canal Irrigation Scheme Improvem Single Stage - One E Under Imple 2025-02-1 IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 1,825,000.00 0.00 2024-04-30 2024-02-20 2024-05-05 2024-02-20 2024-06-16 2024-03-20 2024-07-16 2024-03-29 2024-08-20 L-2 Head in the system of the ents nvelope mentation 6 ss (Non Bank-SPD Vakhsh main canal ) Request for Bids - SWIM-CW-ICB-01 / Rehabilita Irrigation Scheme Improvem Open - Internationa Single Stage - One E Small Works SPD Pending Imp 2025-02-1 tion VMK system subsystem IDA / E0790 Post Request for Bids 5,675,000.00 0.00 2024-05-01 2024-05-06 2024-06-17 2024-07-17 2024-08-21 ents l nvelope (1 envelope proce lementation 7 Kumsangir canal ss) National Procure SWIM-CW-NCB-08 / Rehabilit Irrigation Scheme Improvem Single Stage - One E ment Document - Pending Imp 2025-01-2 ation of Shurobad main canal IDA / E0790 Post Request for Bids Open - National 1,215,000.00 0.00 2024-04-10 2024-04-15 2024-05-27 2024-06-26 2024-07-31 ents nvelope 1 Envelope proce lementation 7 system ss (Non Bank-SPD National ) Procure SWIM-CW-NCB-011 / Critical ment Document - Irrigation Scheme Improvem Single Stage - One E Pending Imp 2024-09-1 reconstruction of the Beshke IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 500,000.00 0.00 2023-12-01 2023-12-06 2024-01-17 2024-02-16 2024-03-22 ents nvelope lementation 8 nt hydroelectric complex ss (Non Bank-SPD ) SWIM-CW-NCB-014 / SCADA National Procure system design, supply, install ment Document - Irrigation Scheme Improvem Single Stage - One E Pending Imp 2024-04-2 ation and commissioning of IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 200,000.00 0.00 2023-07-03 2023-07-08 2023-08-19 2023-09-18 2023-10-23 ents nvelope lementation 0 main water intakes, control g ss (Non Bank-SPD ates and pumping stations ) National Procure SWIM-CW-NCB-09 / Rehabilit Irrigation Scheme Improvem Single Stage - One E ment Document - Under Imple 2024-03-3 ation of the Dangara Main Ca IDA / E0790 Post Request for Bids Open - National 252,000.00 0.00 2023-06-12 2024-02-09 2023-06-17 2024-02-12 2023-07-29 2023-08-28 2023-10-02 ents nvelope 1 Envelope proce mentation 0 nal (DMK) ss (Non Bank-SPD ) National Procure SWIM-CW-NCB-01 / Reconstr ment Document - uction of mechanical repair/p Irrigation Scheme Improvem Single Stage - One E Pending Imp 2025-11-0 IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 700,000.00 0.00 2025-01-13 2025-01-18 2025-03-01 2025-03-31 2025-05-05 ump shop with installation of ents nvelope lementation 1 ss (Non Bank-SPD equipment in Lower Vakhsh ) and Upper Kafernigan National Procure SWIM-CW-NCB-010 / Rehabil ment Document - Irrigation Scheme Improvem Single Stage - One E Pending Imp 2024-09-2 itation of Dangara Irrigation t IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 1,150,000.00 0.00 2023-12-04 2023-12-09 2024-01-20 2024-02-19 2024-03-25 ents nvelope lementation 1 unnel (DIT) L-13,8 km ss (Non Bank-SPD ) Request for Quota SWIM-CW-RFQ-03 / Renovati Water Sector Reform and Ins Request for Quota Single Stage - One E 2023-10-0 IDA / E0790 Post Open - National tions (Non Bank-S 40,000.00 0.00 Completed 2023-02-12 2023-04-09 2023-05-16 on the IMIS department in A titutional Strengthening tions nvelope 6 PD) MI SWIM-CW-RFQ-04 / Emergen Request for Quota Irrigation Scheme Improvem Request for Quota Single Stage - One E 2023-12-0 cy works to restore the floati IDA / E0790 Post Open - National tions (Non Bank-S 198,000.00 0.00 Signed 2023-04-16 2023-06-11 2023-05-03 ents tions nvelope 8 ng platform and gates in DIT PD) Request for Bids - SWIM-CW-NCB-12 / Rehabilit Irrigation Scheme Improvem Single Stage - One E Small Works SPD 2024-09-2 ation of the VMK System, Ce IDA / E0790 Post Request for Bids Open - National 265,000.00 0.00 Signed 2023-12-11 2023-12-20 2023-12-16 2023-12-20 2024-01-27 2024-01-22 2024-02-26 2024-01-26 2024-04-01 ents nvelope (1 envelope proce 8 ntral Channel System ss) SWIM-CW-NCB-013 / Rehabil National Procure itation of the Water Intake H ment Document - Irrigation Scheme Improvem Single Stage - One E 2024-11-1 eadwork Structure at Picket IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 860,000.00 0.00 Signed 2024-01-29 2024-01-26 2024-02-03 2024-01-29 2024-03-16 2024-02-29 2024-04-15 2024-03-04 2024-05-20 ents nvelope 6 46  of the canals, collectors a ss (Non Bank-SPD nd drainage networks of the ) Northern Branch National Procure SWIM-CW-NCB-015 / Rehabil ment Document - itation of irrigation canals an Irrigation Scheme Improvem Single Stage - One E Under Imple 2025-03-0 IDA / E0790 Post Request for Bids Open - National 1 Envelope proce 900,000.00 0.00 2024-05-20 2024-05-27 2024-05-25 2024-06-03 2024-07-06 2024-08-05 2024-09-09 d collector drainage network ents nvelope mentation 8 ss (Non Bank-SPD s L-2 in the Vakhsh and Balkh ) i regions GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 SWIM-G-NCB-03 / Equipment Water Sector Reform and Ins Single Stage - One E IDA / E0790 Post Request for Bids Open - National 150,000.00 0.00 Signed 2024-01-08 2024-01-17 2024-01-13 2024-01-17 2024-02-24 2024-02-22 2024-03-25 2024-02-29 2024-04-29 2024-10-26 for the ALRI design group titutional Strengthening nvelope SWIM-G-NCB-01 / Procureme nt of office furniture and equi Water Sector Reform and Ins Single Stage - One E Pending Impl IDA / E0790 Post Request for Bids Open - National 150,000.00 0.00 2023-07-10 2023-07-15 2023-08-26 2023-09-25 2023-10-30 2024-04-27 pment for organizations of th titutional Strengthening nvelope ementation e Vakhsh, Shurobad and BHC schemes. SWIM-G-NCB-05 / Procureme nt of heavy equipment for W Water Sector Reform and Ins Single Stage - One E Pending Impl UAs in the Lower Vakhsh and IDA / E0790 Post Request for Bids Open - National 920,000.00 0.00 2025-01-06 2025-01-11 2025-02-22 2025-03-24 2025-04-28 2025-10-25 titutional Strengthening nvelope ementation Upper Vakhsh basins (based on a thorough needs assess ment) SWIM-G-NCB-06 / Procureme nt and equipping of instrume nts for measuring/water level Water Sector Reform and Ins Single Stage - One E Pending Impl IDA / E0790 Post Request for Bids Open - National 210,000.00 0.00 2024-04-22 2024-04-27 2024-06-08 2024-07-08 2024-08-12 2025-02-08 (electronic sensors/radar for titutional Strengthening nvelope ementation transmitting water level moni toring data to ISMI, WIS and WUAs) SWIM-G-NCB-07 / Procureme nt of simple drip and sprinkle r irrigation systems, introduc Water Sector Reform and Ins Single Stage - One E Pending Impl IDA / E0790 Post Request for Bids Open - National 160,000.00 0.00 2024-08-05 2024-08-10 2024-09-21 2024-10-21 2024-11-25 2025-05-24 tion of laser leveling and oth titutional Strengthening nvelope ementation er irrigation management me thods for WUA demonstration plots SWIM-G-NCB-08 / Procureme nt of heavy equipment for th Water Sector Reform and Ins Single Stage - One E Pending Impl IDA / E0790 Post Request for Bids Open - National 540,000.00 0.00 2023-05-15 2023-05-20 2023-07-01 2023-07-31 2023-09-04 2024-03-02 e scheme organizations Vakh titutional Strengthening nvelope ementation sh and Shurobad SWIM-RFQ-G-01 / Procureme nt of equipment and furnitur Water Sector Reform and Ins Request for Quota Single Stage - One E e for the WUA support depart IDA / E0790 Post Open - National 10,000.00 0.00 Completed 2023-02-06 2023-04-03 2023-08-16 2023-09-30 titutional Strengthening tions nvelope ment in AMI (including for th e Сomplaint Investigation Me chanism department) SWIM-RFQ-G-03 / Procureme nt of vehicles for organizatio Water Sector Reform and Ins Request for Quota Single Stage - One E IDA / E0790 Post Open - National 60,000.00 0.00 Signed 2024-02-10 2024-04-06 2023-11-03 2024-10-03 ns of the level of the Vakhsh titutional Strengthening tions nvelope and Shurabad schemes SWIM-RFQ-G-04 / Procureme nt of office equipment, furnit Water Sector Reform and Ins Request for Quota Single Stage - One E Pending Impl ure for 11 WUAs and tablets f IDA / E0790 Post Open - National 60,000.00 0.00 2024-02-24 2024-04-20 2024-10-17 titutional Strengthening tions nvelope ementation or 66 WUAs (+partial equipm ent for 20 WUAs based on ne eds assessment) SWIM-RFQ-G-05 / Procureme Water Sector Reform and Ins Request for Quota Single Stage - One E Under Imple nt of furniture and equipmen IDA / E0790 Post Open - National 14,000.00 0.00 2023-04-01 2023-05-27 2023-11-23 titutional Strengthening tions nvelope mentation t for the IMSI department in AMI SWIM-G-NCB-02 / Hardware Water Sector Reform and Ins Single Stage - One E Pending Impl and software for IMIS, integra IDA / E0790 Post Request for Bids Open - National 200,000.00 0.00 2023-07-17 2023-07-22 2023-09-02 2023-10-02 2023-11-06 2024-05-04 titutional Strengthening nvelope ementation ted billing system, call center SWIM-RFQ-G-06 / Procureme nt of office furniture and equi Request for Quota Single Stage - One E Pending Impl pment for PMU, PCU in Bokht IDA / E0790 Project Management Post Open - National 85,000.00 0.00 2022-12-24 2023-02-18 2023-08-17 tions nvelope ementation ar, PMU representatives in G UMI Zarafshan, Upper Vakhs h and BGK SWIM-G-NCB-04 / Procureme Single Stage - One E nt of vehicles for PMU and PC IDA / E0790 Project Management Post Request for Bids Open - National 130,000.00 0.00 Canceled 2022-12-01 2022-12-06 2023-01-17 2023-02-16 2023-03-23 2023-09-19 nvelope U in Bokhtar, WUA support gr oup in AMI SWIM-RFQ-G-07 / Procureme nt of vehicles for PMU, PCU in Request for Quota Single Stage - One E IDA / E0790 Project Management Post Open - National 130,000.00 0.00 Signed 2023-10-25 2023-12-20 2023-11-13 2024-06-17 Bokhtar and WUA support gr tions nvelope oup in AMI. 1 pc - SUV and 3 pc - Сrosso ver NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SWIM-NCS-03 / Procurement of Services for the organizati on of a Study Tour to Ankara, Irrigation Scheme Improvem Request for Quota Single Stage - One E Under Imple IDA / E0790 Post Limited - National 35,000.00 0.00 2024-04-08 2024-06-03 2024-07-02 Turkey on exchange of exper ents tions nvelope mentation ience regarding the Introduct ion of an Irrigation Managem ent Information System (IMIS ) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SWIM-CS-QCBS-01 / Preparat ion of feasibility study, detail ed engineering designs, envir onmental and social impact a Irrigation Scheme Improvem Quality And Cost- / Post Open - National 500,000.00 0.00 Signed 2022-04-15 2022-07-07 2022-05-06 2022-09-01 2022-06-19 2022-10-11 2022-07-17 2022-11-01 2022-08-16 2022-11-08 2022-09-20 2022-11-22 2022-10-25 2022-12-14 2023-10-25 ssessments, and bidding doc ents Based Selection uments for performance impr ovement in the Vakhsh Main Canal (VMC) and Shurobod M ain Canal (ShMC) irrigation sc hemes SWIM-CS-QCBS-02 / Feasibili ty study and design estimate Irrigation Scheme Improvem Quality And Cost- Open - Internationa Under Implement for the rehabilitation of the D IDA / E0790 Post 500,000.00 0.00 2022-10-14 2023-12-07 2022-11-04 2022-12-18 2023-01-15 2023-02-14 2023-03-21 2023-04-25 2024-04-24 ents Based Selection l ation angara tunnel and the Beshk ent hydroelectric complex SWIM-CS-QCBS-07 / Develop ment of a River Basin Manag Water Sector Reform and Ins Quality And Cost- Open - Internationa IDA / E0790 Post 600,000.00 0.00 Canceled 2023-04-10 2023-05-01 2023-06-14 2023-07-12 2023-08-11 2023-09-15 2023-10-20 2024-10-19 ement Plan and support for c titutional Strengthening Based Selection l apacity development of Vakh sh RBO Page 2 SWIM-CS-QCBS-03 / Develop ment of an Irrigation Sector Water Sector Reform and Ins Quality And Cost- Open - Internationa Development Strategy (inclu IDA / E0790 Post 1,100,000.00 0.00 Signed 2023-07-28 2023-05-16 2023-08-18 2023-08-02 2023-10-01 2023-09-13 2023-10-29 2023-11-21 2023-11-28 2023-12-12 2024-01-02 2024-01-08 2024-02-06 2025-02-05 titutional Strengthening Based Selection l ding an audit of the energy s ector and revision of tariffs a nd subsidies) SWIM-CS-QCBS-04 / Support for the WUA department at A Water Sector Reform and Ins Quality And Cost- Open - Internationa LRI to promote and administ IDA / E0790 Post 500,000.00 0.00 Under Review 2023-01-25 2023-09-06 2023-02-15 2023-03-31 2023-04-28 2023-05-28 2023-07-02 2023-08-06 2024-08-05 titutional Strengthening Based Selection l er the incentive program for targeted WUAs and create a national WUA database SWIM-CS-QCBS-06 / Consulti ng services for institutional, f inancial management and co Water Sector Reform and Ins Quality And Cost- Open - Internationa Under Implement IDA / E0790 Post 850,000.00 0.00 2023-01-24 2023-09-06 2023-02-14 2023-12-19 2023-03-30 2024-01-17 2023-04-27 2024-03-04 2023-05-27 2024-03-20 2023-07-01 2024-04-19 2023-08-05 2024-08-04 mmercial capacity building, titutional Strengthening Based Selection l ation GIS-based inventory and ass et management developmen t for single scheme-base SWIM-CS-QCBS-05 / Constru Irrigation Scheme Improvem Quality And Cost- Open - Internationa ction supervision for Vakhsh IDA / E0790 Post 1,196,000.00 0.00 Signed 2023-05-05 2023-10-09 2023-05-26 2023-11-23 2023-07-09 2024-01-12 2023-08-06 2024-02-16 2023-09-05 2024-02-23 2023-10-10 2024-03-15 2023-11-14 2024-11-13 ents Based Selection l Main Canal and Shurobod irri gation systems SWIM-CS-CQS-012 / Baseline Consultant Qualifi Pending Impleme IDA / E0790 Project Management Post Open - National 30,000.00 0.00 2027-06-01 2027-06-22 2027-08-05 2027-09-04 2027-10-09 2028-04-06 survey cation Selection ntation SWIM-CS-CQS-08 / Survey C Consultant Qualifi Pending Impleme onsulting Services for the Ba IDA / E0790 Project Management Post Open - National 30,000.00 0.00 2023-01-05 2023-01-26 2023-03-11 2023-04-10 2023-05-15 2023-11-11 cation Selection ntation seline Study SWIM-CS-CQS-010 / Preparat ion of design and estimate d ocumentation and architectu ral supervision for the rehabil Water Sector Reform and Ins Consultant Qualifi IDA / E0790 Post Open - National 110,000.00 0.00 Signed 2023-01-04 2022-12-23 2023-01-25 2023-01-03 2023-03-10 2023-01-20 2023-04-09 2023-01-29 2023-05-14 2023-02-08 2023-11-10 itation of a floating platform, titutional Strengthening cation Selection a chamber gate for DIT and DMK and inspection after co mpletion of emergency work s in the Dangara irrigation tu nnel SWIM-CS-CQS-01 / Feasibilit y study and DEDs for prioritiz Irrigation Scheme Improvem Consultant Qualifi IDA / E0790 Post Open - National 90,000.00 0.00 Canceled 2023-01-20 2024-01-12 2023-02-10 2023-03-26 2023-04-25 2023-05-30 2023-11-26 ed small and medium invest ents cation Selection ments in Zarafshon and Upp er Vakhsh basins SWIM-CS-CQS-02 / Advisory services for consultation with the population in Rasht, Tajik Irrigation Scheme Improvem Consultant Qualifi Under Implement IDA / E0790 Post Open - National 15,000.00 0.00 2023-01-03 2023-05-23 2023-01-24 2023-03-09 2023-04-08 2023-05-13 2023-11-09 abad and Lakhsh districts on ents cation Selection ation eligibility criteria for the sele ction of small-scale irrigation schemes SWIM-CS-CQS-011 / Consulti Water Sector Reform and Ins Consultant Qualifi Open - Internationa Pending Impleme IDA / E0790 Post 100,000.00 0.00 2023-01-09 2023-01-30 2023-03-15 2023-04-14 2023-05-19 2023-11-15 ng services for updating the I titutional Strengthening cation Selection l ntation MIS SWIM-CS-CQS-001 / Feasibili ty study and DEDs for prioriti Irrigation Scheme Improvem Consultant Qualifi Under Implement IDA / E0790 Post Open - National 236,000.00 0.00 2024-01-22 2024-02-01 2024-02-12 2024-02-09 2024-03-27 2024-03-06 2024-04-26 2024-03-27 2024-05-31 2024-11-27 zed small and medium invest ents cation Selection ation ments in Zarafshon and Upp er Vakhsh basins SWIM-CS-CQS-04 / ESMP mo nitoring, training and assess Irrigation Scheme Improvem Consultant Qualifi Under Implement IDA / E0790 Post Open - National 100,000.00 0.00 2024-02-09 2024-02-06 2024-03-01 2024-02-09 2024-04-14 2024-05-14 2024-06-18 2024-12-15 ment of the social and enviro ents cation Selection ation nmental sustainability of the Project INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TRIP-CS-DC-03 / M&E Consul / Project Management Post Direct Selection Direct 8,500.00 6,208.50 Signed 2021-11-16 2021-12-06 2021-11-26 2021-10-18 2022-01-30 2021-11-05 2022-07-29 tant TRIP-CS-DC-04 / Social Devel / Project Management Post Direct Selection Direct 5,000.00 5,843.29 Signed 2021-11-16 2021-12-06 2021-11-26 2021-10-18 2022-01-30 2021-11-05 2022-07-29 opment Consultant TRIP-CS-DC-05 / Environmen / Project Management Post Direct Selection Direct 3,750.00 1,826.03 Signed 2021-11-16 2021-12-06 2021-11-26 2021-10-18 2022-01-30 2021-11-05 2022-07-29 tal Consultant TRIP-CS-IC-01 / Agro econom Individual Consult / Project Management Post Limited 4,875.00 3,956.40 Signed 2021-11-15 2021-12-06 2021-11-20 2021-11-01 2021-12-11 2021-12-01 2022-01-15 2021-12-14 2022-07-14 ist ant Selection TRIP-CS-IC-02 / Electrical En Individual Consult / Project Management Post Limited 4,500.00 4,382.47 Signed 2021-11-15 2021-12-06 2021-11-20 2021-11-01 2021-12-11 2021-11-22 2022-01-15 2021-12-25 2022-07-14 gineer ant Selection TRIP-CS-IC-03 / Rural Area D Individual Consult / Project Management Post Limited 3,125.00 3,652.06 Signed 2021-11-15 2021-12-06 2021-11-20 2021-11-01 2021-12-11 2021-11-22 2022-01-15 2021-12-19 2022-07-14 evelopment Consultant ant Selection TRIP-CS-IC-04 / WUA Support Individual Consult / Project Management Post Limited 4,063.00 3,043.38 Signed 2021-11-15 2021-12-06 2021-11-20 2021-11-01 2021-12-11 2021-12-07 2022-01-15 2021-12-14 2022-07-14 Consultant ant Selection TRIP-CS-IC-05 / Consultant E Individual Consult Under Implement / Project Management Post Open 3,438.00 0.00 2021-11-15 2021-12-06 2022-01-03 2022-01-24 2022-02-28 2022-08-27 ngineer-Designer ant Selection ation TRIP-CS-IC-06 / Consultant E Individual Consult / Project Management Post Open 3,438.00 0.00 Canceled 2021-11-15 2021-12-06 2022-01-03 2022-01-24 2022-02-28 2022-08-27 ngineer-Estimator ant Selection TRIP-CS-IC-07 / Consultant E Individual Consult / Project Management Post Open 3,438.00 0.00 Canceled 2021-11-15 2021-12-06 2022-01-03 2022-01-24 2022-02-28 2022-08-27 ngineer-Topographer ant Selection TRIP-CS-DC-02 / Procuremen / Project Management Post Direct Selection Direct 6,000.00 5,843.29 Signed 2021-11-23 2021-12-09 2021-12-03 2021-10-18 2022-02-06 2021-12-06 2022-08-05 t Consultant TRIP-CS-DC-01 / Project Prep / Project Management Post Direct Selection Direct 7,000.00 5,112.88 Signed 2021-11-23 2021-12-09 2021-12-03 2021-10-18 2022-01-30 2021-11-05 2022-07-29 aration Manager TRIP-CS-IC-08 / Consultant In Individual Consult / Project Management Post Limited 6,125.00 0.00 Canceled 2021-11-15 2021-12-06 2021-11-20 2021-12-11 2022-01-15 2022-07-14 terpreter/Translator ant Selection Page 3 SWIM-CS-INT-001 / Internati Irrigation Scheme Improvem Individual Consult Open - Internationa onal Consultant to support irr IDA / E0790 Post 70,000.00 0.00 Under Review 2022-11-14 2022-12-01 2023-01-02 2023-01-23 2023-02-27 2023-08-26 ents ant Selection l igation systems design SWIM-CS-IC-01 / Technical A dvisor for IWRM, technical ex Water Sector Reform and Ins Individual Consult Open - Internationa IDA / E0790 Post 120,000.00 0.00 Canceled 2023-02-15 2023-04-05 2023-04-26 2023-05-31 2023-11-27 pert on the development of t titutional Strengthening ant Selection l he basin plan and IWRM SWIM-CS-IC-03 / Internationa Water Sector Reform and Ins Individual Consult Open - Internationa IDA / E0790 Post 60,000.00 0.00 Canceled 2023-01-31 2023-03-21 2023-04-11 2023-05-16 2023-11-12 l remote sensing consultant titutional Strengthening ant Selection l SWIM-IC-L-02 / Local GIS Con Water Sector Reform and Ins Individual Consult IDA / E0790 Post Open - National 54,000.00 0.00 Signed 2023-01-12 2023-04-28 2023-03-02 2023-07-17 2023-03-23 2023-07-20 2023-04-27 2023-07-20 2023-10-24 sultant for IMIS titutional Strengthening ant Selection SWIM-IC-L-03 / IMIS local dat Water Sector Reform and Ins Individual Consult Under Implement IDA / E0790 Post Open - National 54,000.00 0.00 2023-01-17 2024-02-12 2023-03-07 2023-03-28 2023-05-02 2023-10-29 abase consultant titutional Strengthening ant Selection ation SWIM-IC-L-04 / Local Irrigatio Water Sector Reform and Ins Individual Consult Under Implement IDA / E0790 Post Open - National 36,000.00 0.00 2023-01-18 2024-02-02 2023-03-08 2023-03-29 2023-05-03 2023-10-30 n Engineer/IMIS Consultant titutional Strengthening ant Selection ation SWIM-CS-IC-012 / Impact ev Individual Consult Open - Internationa Pending Impleme IDA / E0790 Project Management Post 20,000.00 0.00 2023-02-01 2023-03-22 2023-04-12 2023-05-17 2023-11-13 aluation survey ant Selection l ntation SWIM-CS-INT-002 / Internati onal Engineer for feasibility s Irrigation Scheme Improvem Individual Consult Open - Internationa tudies and DEDs for target irr IDA / E0790 Post 30,000.00 0.00 Signed 2022-12-05 2022-12-08 2023-01-23 2024-01-16 2023-02-13 2024-02-01 2023-03-20 2024-02-01 2023-09-16 ents ant Selection l igation schemes in Lower Va khsh Basin - VMC and ShMC SWIM-CS-IC-06 / Advisor to A LRI (international) on asset m Water Sector Reform and Ins Individual Consult Open - Internationa IDA / E0790 Post 84,000.00 0.00 Under Review 2023-02-20 2023-05-16 2023-04-10 2023-05-01 2023-06-05 2023-12-02 anagement, performance mo titutional Strengthening ant Selection l nitoring and capital strategy SWIM-CS-IC-09 / IMIS local d Water Sector Reform and Ins Individual Consult IDA / E0790 Post Open - National 54,000.00 0.00 Under Review 2023-03-27 2023-05-25 2023-05-15 2023-06-05 2023-07-10 2026-07-14 atabase consultant titutional Strengthening ant Selection SWIM-IC-L-01 / Local coordin ator of the Interagency Worki Water Sector Reform and Ins Individual Consult ng Group (IWG) on the devel IDA / E0790 Post Open - National 36,000.00 0.00 Signed 2023-01-12 2023-02-06 2023-03-02 2023-03-16 2023-03-23 2023-03-17 2023-04-27 2023-03-16 2025-04-16 titutional Strengthening ant Selection opment of an irrigation strate gy and overall coordinator of sub-component 1.2 SWIM-CS-IC-011 / ALRI Advis Water Sector Reform and Ins Individual Consult Open - Internationa or for Irrigation Strategy Dev IDA / E0790 Post 150,000.00 0.00 Signed 2025-02-10 2022-12-23 2025-03-31 2023-01-26 2025-04-21 2023-02-26 2025-05-26 2023-03-17 2025-11-22 titutional Strengthening ant Selection l elopment and IMIS SWIM-CS-IC-013 / Сonsultant to support ALRI in the develo Water Sector Reform and Ins Individual Consult Open - Internationa IDA / E0790 Post 75,000.00 0.00 Signed 2023-05-17 2023-09-06 2023-07-05 2024-01-05 2023-07-26 2024-01-09 2023-08-30 2024-01-10 2024-02-26 pment of the irrigation mana titutional Strengthening ant Selection l gement information system ( IMIS) SWIM-IC-L-05 / Short-term C onsultant for the developme Individual Consult Under Implement IDA / E0790 Project Management Post Open - National 1,875.00 0.00 2023-07-03 2023-11-16 2023-08-21 2023-09-11 2023-10-16 2023-11-15 nt of a comprehensive Stake ant Selection ation holder Training Program SWIM-IC-L-06 / Financial Eco Irrigation Scheme Improvem Individual Consult Under Implement IDA / E0790 Post Open - National 1,900.00 0.00 2023-09-18 2023-10-04 2023-11-06 2023-11-27 2024-01-01 2024-06-29 nomic Index (FEI) Consultant ents ant Selection ation SWIM-IC-L-07 / Consultant fo Irrigation Scheme Improvem Individual Consult Under Implement r Social and Environmental In IDA / E0790 Post Open - National 1,900.00 0.00 2023-09-18 2023-10-04 2023-11-06 2023-11-27 2024-01-01 2024-06-29 ents ant Selection ation dex (SEI) and Gender SWIM-IC-L-08 / Technical sup ervision engineer for the Reh Irrigation Scheme Improvem Individual Consult Under Implement IDA / E0790 Post Open - National 6,000.00 0.00 2023-10-10 2023-10-17 2023-11-28 2023-12-19 2024-01-23 2024-07-21 abilitation of the VMC system ents ant Selection ation , OMC channel subsystem SWIM-IC-L-09 / Technical sup ervision engineer for rehabilit Irrigation Scheme Improvem Individual Consult Under Implement IDA / E0790 Post Open - National 6,000.00 0.00 2023-10-10 2023-10-17 2023-11-28 2023-12-19 2024-01-23 2024-07-21 ation of the VMC system, cen ents ant Selection ation tral channel system SWIM-CS-INT-014 / IT/IS Inte rnational Consultant for Deve loping a long-term technolog Water Sector Reform and Ins Individual Consult Open - Internationa IDA / E0790 Post 40,000.00 0.00 Signed 2023-12-11 2023-12-20 2024-01-29 2024-02-19 2024-02-19 2024-02-21 2024-03-25 2024-09-21 y strategy and Technical Spe titutional Strengthening ant Selection l cifications of the Irrigation M anagement Information Syst em (IMIS) for ALRI SWIM-CS-D-01 / Design supe Irrigation Scheme Improvem IDA / E0790 Post Direct Selection Direct - National 146,150.00 0.00 Canceled 2024-01-08 2024-01-01 2024-01-18 2024-03-23 2024-09-19 rvision ents SWIM-IC-L-10 / Topographer Irrigation Scheme Improvem Individual Consult Under Implement IDA / E0790 Post Open - National 5,250.00 0.00 2024-01-09 2024-01-24 2024-02-27 2024-03-19 2024-04-23 2024-10-20 Engineer ents ant Selection ation SWIM-IC-L-11 / Estimator en Irrigation Scheme Improvem Individual Consult Under Implement IDA / E0790 Post Open - National 5,250.00 0.00 2024-01-09 2024-01-26 2024-02-27 2024-03-19 2024-04-23 2024-10-20 gineer ents ant Selection ation SWIM-IC-L-12 / Technical sup ervision engineer for the Reh Irrigation Scheme Improvem Under Implement IDA / E0790 Post Direct Selection Direct - National 5,250.00 0.00 2024-01-29 2024-01-26 2024-02-08 2024-04-13 2024-10-10 abilitation of the Northern br ents ation anch subsystem in the Vakhs h Main Canal SWIM-IC-L-13 / IT/IS Consulta nt for Developing a long-term Water Sector Reform and Ins Individual Consult Pending Impleme technology strategy and Tec IDA / E0790 Post Open - National 7,000.00 0.00 2024-05-29 2024-07-17 2024-08-07 2024-09-11 2025-03-10 titutional Strengthening ant Selection ntation hnical Specifications of the Ir rigation Management Inform ation System (IMIS) for ALRI SWIM-CS-D-001 / Author sup ervision of the construction o Irrigation Scheme Improvem Pending Impleme IDA / E0790 Post Direct Selection Direct - National 146,150.00 0.00 2024-01-03 2024-01-13 2024-03-18 2024-09-14 f irrigation systems of the Va ents ntation khsh and Shurabad main can als Page 4