The Republic of Türkiye

  Ministry of Agriculture and Forestry

Agriculture Sector Recovery in Türkiye’s
Earthquake-affected Provinces Project
               P181428

                 Draft

   ENVIRONMENTAL AND SOCIAL
    COMMITMENT PLAN (ESCP)

               May 2024




                                         1|Page
                              ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN


1. The Republic of Türkiye (the Borrower) will implement the Agriculture Sector Recovery in Türkiye’s
   Earthquake-affected Provinces Project (the Project), with the involvement of the Ministry of Agriculture and
   Forestry (MoAF), as set out in the Loan Agreement. The International Bank for Reconstruction and
   Development (the Bank), has agreed to provide financing for the Project, as set out in the referred agreement.

2. The Borrower shall ensure that the Project is carried out in accordance with the Environmental and Social
   Standards (ESSs) and this Environmental and Social Commitment Plan (ESCP), in a manner acceptable to the
   Bank. The ESCP is a part of the Loan Agreement. Unless otherwise defined in this ESCP, capitalized terms used
   in this ESCP have the meanings ascribed to them in the referred agreement.

3. Without limitation to the foregoing, this ESCP sets out material measures and actions that the Borrower shall
   carry out or cause to be carried out, including, as applicable, the timeframes of the actions and measures,
   institutional, staffing, training, monitoring and reporting arrangements, and grievance management. The ESCP
   also sets out the environmental and social (E&S) instruments that shall be adopted and implemented under
   the Project, all of which shall be subject to prior consultation and disclosure, consistent with the ESS, and in
   form and substance, and in a manner acceptable to the Bank. Once adopted, said E&S instruments may be
   revised from time to time with prior written agreement by the Bank.

4. As agreed by the Bank and the Borrower, this ESCP will be revised from time to time if necessary, during
   Project implementation, to reflect adaptive management of Project changes and unforeseen circumstances
   or in response to Project performance. In such circumstances, the Borrower, through the MoAF, and the Bank
   agree to update the ESCP to reflect these changes through an exchange of letters signed between the Bank
   and the Borrower, through the General Director of European Union and Foreign Relations of the MoAF of the
   MoAF. The Borrower shall promptly disclose the updated ESCP.




                                                                                                       2|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP) – Agriculture Sector Recovery & Rebuilding in Türkiye’s Earthquake-affected Provinces Project


MATERIAL MEASURES AND ACTIONS                                                                                        TIMEFRAME                        RESPONSIBLE ENTITY
MONITORING AND REPORTING
 A    REGULAR REPORTING                                                                                 Submit six-monthly (semi-annually)         MoAF through its Project
                                                                                                        reports to the Bank throughout Project     Coordination Unit (PCU)
         Prepare and submit to the Bank regular monitoring reports on the environmental, social,        implementation. The first report shall
         health and safety (ESHS) performance of the Project, including but not limited to the          be furnished 45-days after the end of
         implementation of the ESCP, status of preparation and implementation of E&S                    the first 6-months from the Effective
         instruments required under the ESCP, stakeholder engagement activities, and                    Date of the Loan Agreement. Submit
         functioning of the grievance mechanism(s).                                                     each report to the Bank no later than 30
                                                                                                        days after the end of each reporting
                                                                                                        period.
   B     INCIDENTS AND ACCIDENTS                                                                                                                   MoAF through PCU in
                                                                                                                                                   coordination             with
         Promptly notify the Bank of any incident or accident related to the Project which has, or      Notify Bank no later than 48 hours after   implementing          General
         is likely to have, a significant adverse effect on the environment, the affected               learning of the incident or accident.      Directorates as relevant
         communities, the public or workers, including, inter alia, cases of sexual exploitation and
         abuse (SEA), sexual harassment (SH), and accidents that result in death, serious or multiple
         injury, Occupational Health and Safety (OHS) accidents, road accidents. Provide sufficient
         detail regarding the scope, severity, and possible causes of the incident or accident,
         indicating immediate measures taken or that are planned to be taken to address it, and
         any information provided by any contractor and/or supervising firm, as appropriate.

         Subsequently, at the Bank’s request, prepare a report on the incident or accident and          The incident reports shall be submitted
         propose any measures to address it and prevent its recurrence.                                 to the Bank within a timeframe
                                                                                                        acceptable to the Bank.
   C     CONTRACTORS’ MONTHLY REPORTS                                                                   Submit the monthly reports to the Bank     MoAF through       PCU    in
                                                                                                        upon request as annexes to the reports     coordination            with
         Require contractors and supervising firms to provide to respective Implementing                to be submitted under action A above.      implementing         General
         General Directorates monthly monitoring reports on ESHS performance, on all                    Reporting by contractors shall start 30    Directorates
         Subproject sites, in accordance with the metrics specified in the respective bidding           days after the construction contractors
         documents and contracts , and submit such reports to the Bank through the Project              begin the respective activities.
         Coordination Unit (PCU) upon request. Include reporting requirements in bidding
         documents of contractors.




                                                                                                                                                                      3|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP) – Agriculture Sector Recovery & Rebuilding in Türkiye’s Earthquake-affected Provinces Project


MATERIAL MEASURES AND ACTIONS                                                                                            TIMEFRAME                        RESPONSIBLE ENTITY
ESS 1: ASSESSMENT AND MANAGEMENT OF ENVIRONMENTAL AND SOCIAL RISKS AND IMPACTS
 1.1    ORGANIZATIONAL STRUCTURE

         Establish and maintain an organizational structure with qualified staff and resources to
         support management ESHS risks and impacts of the Project, acceptable to the Bank, as
         follows:
                                                                                                           Establish the PCU and project
           (i) The PCU under the MoAF General Directorate of EU and Foreign Relations (ABDGM)              implementing structures/teams within        MoAF through ABDGM (PCU)
               that shall be responsible for E&S management of the Project. One environmental and          General Directorates as set out on the      TRGM, HAYGEM and BUGEM
               one social specialist shall be assigned at the PCU to implement the E&S management          Loan Agreement no later than 60 days
               plan and measures.                                                                          of the Project Effective date and
                                                                                                           maintain throughout Project
           (ii) The General Directorates (GDss) within the following MoAF General Directorates:            implementation.
                General Directorate of Agricultural Reform (TRGM) (Part 1 of the Project), General
                Directorate of Livestock (HAYGEM) (Part 2.A of the Project) and General Directorate        Assign/ appoint qualified environmental
                of Plant Production (BUGEM) (Part 2.B of the Project). Each GDs shall appoint              and social staff no later than sixty (60)
                dedicated E&S focal points (one environmental and one social focal points) to              days after the Effective Date of the Loan
                implement the E&S management plans and measures.                                           Agreement, and thereafter maintain the
                                                                                                           said positions the GDs throughout
                                                                                                           Project implementation.

  1.2    ENVIRONMENTAL AND SOCIAL INSTRUMENTS
                                                                                                            1. Adopt the ESMF by project by            MoAF through the PCU and
         1. Disclose, consult upon, update, redisclose, adopt and implement the Environmental and          appraisal and thereafter implement          implementing General
         Social Management Framework (ESMF) for the Project, consistent with the relevant ESSs.            the ESMF throughout Project                 Directorates
                                                                                                           implementation.

         2. Screen any proposed Subproject activities in accordance with the ESMF prepared for             2. Adopt the Subproject-specific ESMPs
         the Project, and, thereafter, prepare, adopt, and implement [and cause Selected                   prior to launching the bidding process
         Beneficiaries under Part 2.A of the Project to adopt and implement] the Subproject-               for the respective Subproject that
         specific Environmental and Social Management Plans (ESMPs), as required, in a manner              requires the adoption of such ESMP, and
         acceptable to the Bank. The proposed Subprojects described in the exclusion list set out          thereafter implement the ESMPs
         in the ESMF and the list of Excluded Activities under the Loan Agreement shall be ineligible      throughout Project implementation.
         to receive financing under the Project. Exclusions include, inter alia, any activities rated as
         having “high�? or “substantial�? environmental and/or social risks in accordance with the
         ESMF, including activities with significant impacts on biodiversity and
         cultural heritage.

                                                                                                                                                                        4|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP) – Agriculture Sector Recovery & Rebuilding in Türkiye’s Earthquake-affected Provinces Project


MATERIAL MEASURES AND ACTIONS                                                                                         TIMEFRAME                        RESPONSIBLE ENTITY
 1.3  MANAGEMENT OF CONTRACTORS                                                                         As part of the preparation of               MoAF through PCU and
                                                                                                        procurement documents and respective       implementing General
         Incorporate the relevant aspects of the ESCP, including, inter alia, the relevant E&S          contracts.                                 Directorates
         instruments, the Labor Management Procedures, and code of conduct, into the ESHS
         specifications of the procurement documents and contracts with contractors and                 Supervise contractors throughout
         supervising firms. Thereafter ensure that the contractors and supervising firms comply         Project implementation.
         and cause subcontractors to comply with the ESHS specifications of their respective
         contracts.


  1.4    TECHNICAL ASSISTANCE                                                                           Throughout Project implementation.         MoAF through PCU and
                                                                                                                                                   implementing General
         Ensure that the consultancies, studies (including feasibility studies, if applicable),                                                    Directorates
         capacity building, training, and any other technical assistance activities under the Project
         are carried out in accordance with terms of reference acceptable to the Bank, that are
         consistent with the ESSs. Thereafter ensure that the outputs of such activities comply
         with the terms of reference.

ESS 2: LABOR AND WORKING CONDITIONS
 2.1    LABOR MANAGEMENT PROCEDURES

         Adopt and implement the Labor Management Procedures (LMP) for the Project,                     Adopt the LMPs by no later than sixty
         including, inter alia, provisions on working conditions, management of workers                 (60) days following the Effective Date,
         relationships, occupational health and safety (including personal protective equipment,        and prior to hiring of Project personnel
         and emergency preparedness and response), code of conduct (including relating to GBV           (whichever comes first) and thereafter
         and SEA/SH), forced labor, child labor, grievance arrangements for Project workers, and        implement the LMP throughout Project       MoAF through PCU and
         applicable requirements for contractors, subcontractors, and supervising firms.                implementation.                            implementing General
                                                                                                                                                   Directorates
         Include Project LMP into bidding documents of contractors. Require awarded contractors
         to adopt Project LMP (including Code of Conduct). Require contractors to take
         responsibility for adherence to LMP by their subcontractors.
  2.2    GRIEVANCE MECHANISM FOR PROJECT WORKERS                                                        Establish grievance mechanism prior to     MoAF through PCU and
                                                                                                        engaging Project workers and maintain      implementing General
         Establish and operate a grievance mechanism for Project workers, as described in the           and operate it throughout Project          Directorates
         LMP and consistent with ESS2.                                                                  implementation.

ESS 3: RESOURCE EFFICIENCY AND POLLUTION PREVENTION AND MANAGEMENT

                                                                                                                                                                    5|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP) – Agriculture Sector Recovery & Rebuilding in Türkiye’s Earthquake-affected Provinces Project


MATERIAL MEASURES AND ACTIONS                                                                                      TIMEFRAME                           RESPONSIBLE ENTITY
 3.1  WASTE MANAGEMENT PLAN                                                                           Same timeframe as for the adoption           MoAF through PCU and
      Measures and procedures for the management of waste and hazardous materials during              and implementation of the Subproject-        implementing General
      Subproject implementation shall be integrated in the Subproject-specific ESMP and               specific ESMP.                               Directorates
      implemented, and/or stand-alone Waste Management Plans (WMP) shall be adopt and
      implemented, as relevant to manage hazardous and non-hazardous wastes, as set forth in
      the ESMF and consistent with ESS3.
 3.2  RESOURCE EFFICIENCY AND POLLUTION PREVENTION AND MANAGEMENT                                     Same timeframe as for the adoption           MoAF through PCU and
      Incorporate resource efficiency and pollution prevention and management measures in             and implementation of the Subproject-        implementing General
      the Subproject-specific ESMP to be prepared under action 1.2 above as set forth in the          specific ESMP                                Directorates
      ESMF and consistent with ESS3.

ESS 4: COMMUNITY HEALTH AND SAFETY
 4.1    TRAFFIC AND ROAD SAFETY                                                                       Same timeframe as for the adoption           MoAF through PCU and
        Incorporate measures to manage traffic and road safety risks as required in the               and implementation of the Subproject-        implementing General
        subproject-specific ESMP to be prepared under action 1.2 above, as set forth in the           specific ESMP.                               Directorates
        ESMF and consistent with ESS4
 4.2    COMMUNITY HEALTH AND SAFETY
        Assess and manage specific risks and impacts to the community arising from Subproject         Same timeframe as for the adoption           MoAF through PCU and
        activities, including, inter alia, those caused by the behavior of Project workers, risk of   and implementation of the Subproject-        implementing General
        labor influx; risks of Gender Based Violence (GBV)/Sexual Exploitation and Abuse Sexual       specific ESMP.                               Directorates
        Harassment (SEA-SH), emergency situations, , potential for community exposure to
        communicable diseases, dust and noise, disturbance due to improper management of
        wastes generated during the reconstruction and improvement of infrastructure works.

        Include mitigation measures in Subproject specific ESMPs to be prepared under action
        1.2 (2) above in accordance with the ESMF.
ESS 5: LAND ACQUISITION, RESTRICTIONS ON LAND USE AND INVOLUNTARY
 5.1    RESETTLEMENT POLICY FRAMEWORK
                                                                                                                                                   MoAF through PCU and
         Adopt and implement a Resettlement Policy Framework (RPF) for the Project, consistent        Adopt the RPF no later than sixty (60)       implementing General
         with ESS5.                                                                                   days after the Effective Date of the Loan    Directorates
                                                                                                      Agreement, and thereafter implement
                                                                                                      the     RPF       throughout       Project
                                                                                                      implementation.




                                                                                                                                                                    6|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP) – Agriculture Sector Recovery & Rebuilding in Türkiye’s Earthquake-affected Provinces Project


MATERIAL MEASURES AND ACTIONS                                                                                       TIMEFRAME                        RESPONSIBLE ENTITY
 5.2  RESETTLEMENT PLANS                                                                             RAPs shall be implemented before
                                                                                                     commencement of any civil works for          MoAF through    PCU and
         Adopt and implement a resettlement action plan (RAP) for each activity under the Project    the Project activities that involve land     implementing      General
         for which the RPF requires such RAP, as set out in the RPF, and consistent with ESS5.       acquisition, restrictions on land use, and   Directorates
                                                                                                     involuntary resettlement, including
                                                                                                     ensuring that, before taking possession
                                                                                                     of the land and related assets, full
                                                                                                     compensation has been provided and, as
                                                                                                     applicable, displaced people have been
                                                                                                     resettled and moving allowances have
                                                                                                     been provided.

  5.3    GRIEVANCE MECHANISM                                                                                                                      MoAF through    PCU and
                                                                                                     Prior to implementation of any RAP of        implementing      General
         Ensure Subproject RAPs describe GM for physical and economic displacement due to            Subprojects.                                 Directorates
         land acquisition, in line with GM defined in the SEP prepared for the Project.

ESS 6: BIODIVERSITY CONSERVATION AND SUSTAINABLE MANAGEMENT OF LIVING NATURAL RESOURCES
 6.1    BIODIVERSITY RISKS AND IMPACTS                                                          Same timeframe as for the adoption and            MoAF through PCU and
                                                                                                implementation of the Subproject-                 implementing General
        Include in all Subproject-specific ESMPs with the potential impacts on natural habitats specific ESMP.                                    Directorates
        and supporting flora and fauna species, a site biodiversity assessment and, as needed,
        and relevant mitigation and monitoring activities in the ESMP.

ESS 7: INDIGENOUS PEOPLES/SUB-SAHARAN AFRICAN HISTORICALLY UNDERSERVED TRADITIONAL LOCAL COMMUNITIES
Not relevant to the project.
ESS 8: CULTURAL HERITAGE
 8.1     CHANCE FINDS                                                                             Same timeframe as for the preparation           MoAF through PCU and
         Describe and implement the chance finds procedures as part of the Subproject-specific    and adoption of Subproject-specific             implementing General
         ESMPs developed for the Project under action 1.2 above, as set forth in the ESMF and     ESMPs under action 1.2 above.                   Directorates
         consistent with ESS8.                                                                    Implement the procedures throughout
                                                                                                  Project implementation.
         Chance Finds Procedures shall be included into all civil works contracts and contractors
         are required to adhere.

ESS 9: FINANCIAL INTERMEDIARIES
Not relevant to the project.

                                                                                                                                                                  7|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP) – Agriculture Sector Recovery & Rebuilding in Türkiye’s Earthquake-affected Provinces Project


MATERIAL MEASURES AND ACTIONS                                                                                       TIMEFRAME                       RESPONSIBLE ENTITY
ESS 10: STAKEHOLDER ENGAGEMENT AND INFORMATION DISCLOSURE
 10.1 STAKEHOLDER ENGAGEMENT PLAN PREPARATION AND IMPLEMENTATION                                      Adopt and disclose the SEP by appraisal    MoAF through    PCU and
                                                                                                      and implement throughout Project           implementing      General
         Adopt and implement a Stakeholder Engagement Plan (SEP) for the Project, consistent          implementation.                            Directorates
         with ESS10, which shall include measures to, inter alia, provide stakeholders with timely,
         relevant, understandable and accessible information, and consult with them in a culturally
         appropriate manner, which is free of manipulation, interference, coercion, discrimination
         and intimidation.
 10.2    PROJECT GRIEVANCE MECHANISM                                                                  Establish the grievance mechanism no       MoAF through the PCU shall
                                                                                                      later than sixty (60) days after the       be responsible and shall
         Establish, publicize, maintain, and operate an accessible grievance mechanism, to receive    Effective Date of the Loan Agreement,      cause the contractors to
         and facilitate resolution of concerns and grievances in relation to the Project, promptly    and thereafter maintain and operate the    carry out.
         and effectively, in a transparent manner that is culturally appropriate and readily          mechanism       throughout      Project
         accessible to all Project-affected parties, at no cost and without retribution, including    implementation.
         concerns and grievances filed anonymously, in a manner consistent with ESS10 as
         described SEP.

       The grievance mechanism shall be equipped to receive, register, and facilitate the
       resolution of SEA/SH complaints, including through the referral of survivors to relevant
       gender-based violence service providers, all in a safe, confidential, and survivor-centered
       manner.
CAPACITY SUPPORT
 CS1   Provide training to PCU and General Directorates staff, stakeholders, communities,             Initial training, targeting PCU and GD     MoAF through PCU and
       Project workers, or other involved parties on:                                                 staff shall be provided no later than 90   implementing General
           • World Bank Environmental and Social Framework and procurement procedures                 days after formation of the PCU and the    Directorates
           • National environmental and social legislation                                            consolidation of implementing teams at
           • Project specific instruments namely, ESMF, RF, LMP, SEP                                  the General Directorates.
           • Environmental and social assessments, and preparation and implementation of
                project and site-specific E&S instruments
           • Monitoring and reporting of E&S aspects of the Project                                   Refresher trainings shall be provided at
           • Stakeholder mapping and engagement                                                       least once a year or as needed, during
           • Specific aspects of environmental and social assessment                                  Project implementation.
           • Land acquisition, restrictions on land use and involuntary resettlement
           • International requirements for tender procedures
           • Emergency preparedness and response
           • Community health and safety (including SEA/SH and Covid-19 prevention
                measures)
                                                                                                                                                                  8|Page
ENVIRONMENTAL AND SOCIAL COMMITMENT PLAN (ESCP) – Agriculture Sector Recovery & Rebuilding in Türkiye’s Earthquake-affected Provinces Project


MATERIAL MEASURES AND ACTIONS                                                                                      TIMEFRAME                       RESPONSIBLE ENTITY
           • Codes of conduct
           • Other relevant topics, as needed.
 CS2  Training shall be delivered to Project workers on occupational health and safety (OHS)         Prior to commencing works, followed        MoAF through PCU and
      including on emergency prevention and preparedness and response arrangements to                by a minimum one annual refresher          implementing General
      emergency situations, and diverse and respectful workplaces, free of sexual exploitation,      training.                                  Directorates
      abuse, or harassment (SEA/SH).




                                                                                                                                                                9|Page