The World Bank Implementation Status & Results Report Justice for Business Project (P167247) Justice for Business Project (P167247) EUROPE AND CENTRAL ASIA | Croatia | Governance Global Practice | IBRD/IDA | Investment Project Financing | FY 2020 | Seq No: 7 | ARCHIVED on 07-Jun-2023 | ISR56018 | Implementing Agencies: Ministry of Economy and Sustainable Development (MoESD), Ministry of Justice and Public Administration (MoJPA), Ministry of Physical Planning, Construction and State Assets (MoPPCSA), Republic of Croatia Key Dates Key Project Dates Bank Approval Date: 31-Mar-2020 Effectiveness Date: 29-Jun-2020 Planned Mid Term Review Date: 01-May-2023 Actual Mid-Term Review Date: 17-Apr-2023 Original Closing Date: 30-Jun-2025 Revised Closing Date: 30-Jun-2025 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to improve the business regulatory procedures and justice service standards for businesses andcitizens. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Reducing the administrative burden for businesses to interact with government Improving justice services for businesses and citizens Project Management and Technical Assistance Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions Project performance has improved since the last ISR of December 2022. Total disbursement now stand at approximately 35% of the IBRD loan. As of April 2023, disbursement linked results have been achieved and related disbursements processed in relation to the following disbursement link indicators: DLI #1 Implementation of a single digital window for LLCs, DLI #2 Licensing requirements published online with selected licenses digitalized, DLI 3#a Simplifying construction permitting, DLI #3b Simplifying the requirements for professional services in the construction sector, DLI #4 Increased uptake of e-Justice tools, DLI #5 reduction of the court backlog of cases older than 10 years and DLI #6 reduction in disposition time. A Grievance Redress Mechanism has been established for the Project and is accessible in the following link:https://mpu.gov.hr/istaknute- teme/projekti/projekti-ostalo/projekti-financirani-iz-zajmova-medjunarodnih-financijskih-institucija/poziv-na-javno-savjetovanje/21598. 6/7/2023 Page 1 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Substantial Substantial Substantial Macroeconomic Moderate Substantial Substantial Sector Strategies and Policies Substantial Substantial Substantial Technical Design of Project or Program Substantial Substantial Substantial Institutional Capacity for Implementation and Substantial Substantial Substantial Sustainability Fiduciary Moderate Moderate Moderate Environment and Social Moderate Moderate Moderate Stakeholders Moderate Moderate Moderate Other -- -- -- Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes Improvement of business regulatory procedures IN01286532 ►Time and number of procedures to register an LLC (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Additional 20% 19.5 days and 7 9 days and a single 9 days and a single reduction (30% of Value procedures to start an procedure to start an procedure to start an baseline) in the time LLC LLC. LLC. and procedures for registering LLCs Date 31-Dec-2019 16-Dec-2022 21-Apr-2023 30-Jun-2025 Measured as a percentage reduction in time and the number of procedures. Since the Doing Business Report was cancelled, the team has relied on alternative data sources, such as the information provided by the Ministry of Economy and Sustainable Development (MoESD). Moreover, the WB team hired a Comments: Consultant to provide an independent third party review of the information submitted by the Ministry. The Consultant has confirmed this information. The verification protocol as provided in the Project Operational Manual was revised accordingly. IN01286534 6/7/2023 Page 2 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) ►Percentage of licenses with information on licensing requirements published online (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 0 percent licensed 0 percent licensed 0 percent licensed activities with online activities with online activities with online Value 75% information on licensing information on licensing information on requirements requirements licensing requirements Date 31-Dec-2019 16-Dec-2022 21-Apr-2023 30-Jun-2025 Comments: Number of licenses that can be applied for and obtained online IN01286536 ►Number of procedures to obtain a construction and a use permit (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Additional 20% 36% reduction (14 63% reduction (14 reduction (35% from procedures) in the 22 procedures to obtain procedures) in the the baseline) in the number of procedures Value a construction permit and number of procedures to number of procedures to obtain a a use permit obtain a construction to obtain a construction permit permit and a use permit. construction and a use and a use permit. permit Date 31-Dec-2019 16-Dec-2022 21-Apr-2023 30-Jun-2025 Since the Doing Business Report was cancelled, the team relied on alternative data sources, such as the information provided by the Ministry of Construction, Physical Planning and State Assets. Accordingly, the verification protocol was revised as documented in the Project Operational Manual. The WB team also hired a Consultant that provided independent third party review and confirmed the information submitted Comments: by the Ministry. Thus, the verification process based on the revised POM has been completed and the confirmation package was submitted for disbursement. Improvement of justice service standards for businesses and citizens IN01286533 ►Disposition time for the issuance of judicial decisions in cases before commercial courts (DLI 6) (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target 240 days (25% 320 days Value 252 days 245 days reduction) Date 31-Dec-2019 31-Oct-2022 31-Dec-2022 31-Dec-2023 Disposition Time (DT) of commercial cases. The disposition time is measured from January 1 to December 31. The MOJPA shared evidence of partial achievement (9,38% reduction compared to the baseline) of the 2021 DLR in 2021, which was verified and submitted for disbursement. During the latest mission in November, 2022, the MoJPA informed of further developments and prospects for further progress towards 2023 DLR. Following the established reporting practice, the MOJPA has notified the Bank of the progress against the Comments: baseline and the target results from January 01 to October 31, in 2022. The current value of 252 days is based on the calculation of the court’s performance and includes performance data only for ten months (January-October) in 2022. This is the main reason for the different values reported in previous ISRs, and results reported at the end of the year. Next comparable and commensurable data will be available in ICMS at the end of this calendar year, December 31, 2022, and reported in the first Q of 2023. IN01286535 6/7/2023 Page 3 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) ►Court users’ and stakeholders’ satisfaction with respect to service delivery in the four selected courts (citizen engagement indicator) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Terms of Reference for Court Users' Survey are being reviewed and updated by special person Terms of Reference for hired by the PIU. The Court Users' Survey are plans are to hire a being reviewed and Consultancy (second updated by special quarter 2023) to person hired by the PIU. conduct the survey/s 20% increase in user The plans are to hire a during 2023 and 2024 TBD (The baseline will and stakeholder Consultancy to conduct and provide be set by the results of a satisfaction from the Value the survey/s in the first preliminary baseline survey to be conducted baseline in the four quarter of 2023 and results before starting after loan effectiveness) court facilities where provide preliminary of the civil works on renovation is done baseline results by April, each court (Kutina - 2023. (The baseline will September 2023 , be set by the results of a Zagreb II Phase - survey/s to be September 2023, conducted). Varaždin – February 2024, Vinkovci – April 2024. (The baseline will be set by the results of a survey/s to be conducted). Date 31-Dec-2019 13-Jun-2022 24-May-2023 31-Dec-2024 Measured through a survey as court users’ and stakeholders’ satisfaction with respect to the quality of justice service delivery in the four selected courts. It is expected first survey/s to be conducted in Q2 2023 Comments: that would inform the baseline. Intermediate Results Indicators by Components 1.1. Removing regulatory barriers for market entry and operation IN01286540 ►Implementation of a single digital window for LLCs (DLI 1) (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target A single digital window, which can be accessed from different entry points, is the only system for A single digital window A single digital window the completion of all The single digital window that offers online that offers online the formalities required Value for LLCs is not business registration for business registration by the 5 agencies operational LLCs is operational and for LLCs is operational (Commercial Court in use. and in use. Registry, Tax Administration, Statistics, Pension and Health Insurance) to start an LLC and 6/7/2023 Page 4 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) registration of at least five types of changes. Date 31-Dec-2019 13-Jun-2022 21-Apr-2023 29-Dec-2023 First milestone has been achieved. Comments: IN01286547 ►Number of changes for LLCs that are digitalized through the single digital window (e.g. change in address, name, directors, voluntary liquidation) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 5.00 Date 31-Dec-2019 13-Jun-2022 21-Apr-2023 30-Jun-2025 IN01286548 ►Percentage of new LLCs disaggregated by gender (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 100.00 Date 31-Dec-2019 13-Jun-2022 21-Apr-2023 30-Jun-2025 IN01286549 ►Beneficiary satisfaction with business registration services offered through single digital window(citizen engagement indicator) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 31-Dec-2019 13-Jun-2022 21-Apr-2023 30-Jun-2025 IN01286551 ►Beneficiary satisfaction with the online information licensing platform (citizen engagement indicator) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 31-Dec-2019 13-Jun-2022 21-Apr-2023 30-Jun-2025 IN01286552 ►Licensing requirements are published online, and selected licenses are digitalized (DLI 2) (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target An online informational portal with licensing There is no online requirements is There is no online There is no online informational licensing operational informational licensing informational licensing portal; 0 licenses Value portal; 0 licenses portal; 0 licenses published Licensing for 15 published published online/digitalized business activities is online/digitalized online/digitalized digitalized and transactional 6/7/2023 Page 5 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) Date 31-Dec-2019 13-Jun-2022 21-Apr-2023 29-Dec-2023 1.2. Simplifying construction permitting and improving market functioning in the construction sector IN01286541 ►Simplifying construction permitting (DLI 3a) (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target a. E-Dozvola platform is fully operational in E-Dozvola platform E-Dozvola platform Croatia, including in City reflects simplified reflects simplified of Zagreb. construction permitting construction permitting E-Dozvola platform is not b. Construction procedures and is procedures and is operational in the city of permitting procedures Value upgraded to include upgraded to include Zagreb have been simplified by the “E-Construction the “E-Construction the ministry in charge of Logbook” and Logbook” and construction by issuance of the use issuance of the use introducing the e- permit permit Conference module in e- Dozvola platform. Date 31-Dec-2019 13-Jun-2022 21-Apr-2023 31-Dec-2022 Both milestones have been achieved and confirmed. Comments: IN01286544 ►Simplifying requirements for the provision of professional services in the construction sector (DLI 3b) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target One (1) requirement One (1) requirement (mandatory (mandatory professional professional chamber chamber membership is membership is abolished) for each of the abolished) for each of At least one two professions (works the two professions 0 requirements are requirement for each manager and site (works manager and simplified in the provision of the 4 additional Value manager) in the site manager) in the of professional services professions in the construction construction in the construction sector construction sector is sector is simplified. The sector is simplified. simplified withdrawal procedure The withdrawal was completed in procedure was October and mil. 1 EUR completed in October disbursed. and mil. 1 EUR disbursed. Date 31-Dec-2019 13-Jun-2022 21-Apr-2023 29-Dec-2023 2.1. Expanding the use of electronic services in the justice sector IN01286537 ►Increased uptake of e-Justice tools: a) First instance courts (misdemeanor depts. within municipal and administrative courts) that are integrated in ICMS; b) Courts using e-communication system (DLI4) (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Misdemeanor (I milestone): 19 (I milestone): 19 Four Administrative departments within municipal courts use e- municipal courts use Courts and the High Value municipal courts and communication; and e-communication; and Administrative Court administrative courts are misdemeanour misdemeanour are integrated in ICMS; 6/7/2023 Page 6 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) not integrated in the departments within departments within and at least nine ICMS municipal courts, municipal courts, additional municipal All commercial courts (9) including High including High courts use the e- integrated in ICMS Misdemeanour Court Misdemeanour Court communication system integrated in ICMS integrated in ICMS (2021). All commercial courts (achieved, verified and (achieved, verified and use e-communication disbursed). disbursed). with lawyers, courts experts and bankruptcy (II milestone): Additional (II milestone): trustees. 9 municipal courts – 31 Additional 9 municipal courts in total use e- courts – 31 courts in 2 municipal courts use e- communication and all total use e- communication system. (4) administrative courts communication and all and High Administrative (4) administrative Court integrated in ICMS courts and High (achieved, verified by Administrative Court TPV and evidence integrated in ICMS package submitted for (achieved, verified by disbursement). With this, TPV and evidence final target for this DLI package submitted for has been fully achieved. disbursement). With this, final target for this DLI has been fully achieved. Date 31-Dec-2019 25-Nov-2022 25-Nov-2022 31-Dec-2021 This DLI has been fully achieved and disbursement made. Comments: IN01286543 ►Percentage of e-briefs in total number of commercial courts briefs (communication of the courts with parties to the proceedings) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 2.59 69.61 54.00 45.00 Date 31-Dec-2019 31-Dec-2021 31-Dec-2021 31-Dec-2024 Achievements to date are above end-target. Comments: 2.2. Improving efficiency of dispute resolution in municipal and commercial courts IN01286538 ►Reduction of court backlog of cases older than 10 years (DLI 5) (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target 30% reduction with Value 9131 cases 6292 cases 7909 cases respect to the baseline Date 31-Dec-2019 31-Oct-2022 31-Dec-2022 31-Dec-2022 (I Milestone): Verified (77,2% achievement-8426 cases) and partially disbursed (3,088 mil.) upon evidence and report presented by the MoJPA and courts at the end of 2020. The Annual Report on the judicial branch for 2021 presented by the president of the Supreme court (SC) Comments: before the Parliament informs of the significant increase of the aging case index and additional “inflow” of 13 669 cases to the backlog of older than 10 years. Despite the fact that the courts managed to resolve 13 805 cases during 2021, with decreased number of judges-especially at the first instance where most of 6/7/2023 Page 7 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) the backlog resides- the result for 2021 kept the level of backlog as in 2020 (8,426 cases). The president of the SC requested the county courts to prepare a plan for reducing the cases older than 7 years and MOJPA has included this new target in the new strategy for development of judiciary (NRRP 2021-2026, National Plan for justice development 2022-2026). Better and closer monitoring mechanism of age structure has been put in place and it remains to be seen if the next milestone (20% reduction) will be achieved by the end of 2022, when the data comparable to the baseline will be available. During the November mission, MoJPA presented the latest data for 2022 (between Jan-Oct 2022) which show remarkable progress and almost 31% less cases or 6292 cases are older than 10 years which represents 2,03% of the total number of pending cases. This achievement is beyond the final target of 30% set for this DLI. Nonetheless, a case-flow in November and December is yet to be seen before being able to analyze the exact reduction against the baseline IN01286546 ►Percentage of cases older than 10 years against the total number of unresolved/pending cases (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 2.55 2.03 2.03 1.50 Date 31-Dec-2019 31-Oct-2022 31-Oct-2022 31-Dec-2024 Percentage of cases older than 10 years against the total number of unresolved/pending cases. The percentage has increased in comparison to 2021, due to the increased number of aging cases (age case Comments: index) during 2021. However, overall number of all pending cases is reducing. Relevant comparable data will be available at the end of this calendar year. 2.3. Rehabilitation and upgrading of selected court facilities IN01286545 ►Improvement in energy efficiency certificate grade (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Zagreb – Energy Efficiency Certificate: Zagreb - Energy Zagreb - Energy C Zagreb - Energy Efficiency Certificate: F Efficiency Certificate: F Efficiency Certificate: F Varazdin – Energy Varazdin - Energy Varazdin - Energy Efficiency Certificate: Varazdin - Energy Efficiency Certificate: F Efficiency Certificate: F C Efficiency Certificate: F Value Kutina - Energy Kutina - Energy Kutina – Energy Kutina - Energy Efficiency Certificate: F Efficiency Certificate: F Efficiency Certificate: Efficiency Certificate: F C Vinkovci - Energy Vinkovci - Energy Vinkovci - Energy Efficiency Certificate: F Efficiency Certificate: F Vinkovci – Energy Efficiency Certificate: F Efficiency Certificate: C Date 31-Dec-2019 13-Jun-2022 13-Jun-2022 31-Dec-2024 Improved energy efficiency through reduced primary energy, heating, cooling and water consumption will Comments: be observed following reconstruction of courts. IN01286550 ►User satisfaction with the witness and victims vulnerable user-friendly spaces in the Zagreb Municipal Court (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 6/7/2023 Page 8 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) Terms of Reference for Court Users' Terms of Reference for Survey are currently Court Users' Survey are reviewed by the currently reviewed by the specialist hired by the specialist hired by the PIU. The Consultancy TBD (A baseline survey PIU. The Consultancy for for conducting surveys 30% increase in user will be carried out after conducting surveys is Value is expected to be hired satisfaction from the effectiveness to expected to be hired at in the second quarter baseline determine the baseline.) the beginning of 2023 of 2023 and collect and collect and provide and provide preliminary (baseline) preliminary (baseline) data for all (four) data for all (four) locations, by April 2023. locations, by December 2023. Date 31-Dec-2019 21-Nov-2022 24-May-2023 31-Dec-2024 Satisfaction survey on the witness and victims vulnerable user-friendly spaces in the Zagreb Municipal Court. It is expected first survey to be conducted in the first semester of 2023 that would inform the Comments: baseline. 2.4. Strengthening Public Investment Management practices in the judiciary IN01286539 ►Rollout of the investment and facility management application for the judiciary (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target The Government The Government decided decided to implement to implement this facility Investment and facility this facility management tool across management application management tool all sectors, so the Investment and facility for the judiciary has not across all sectors, so procurement has been management been rolled out. the procurement has Value postponed until application for the been postponed until specifications for other judiciary has been Technical specifications specifications for other sectors are finalized and rolled out prepared for sectors are finalized ready to publish for e- procurement process and ready to publish consultation and for e-consultation and tendering procedure. tendering procedure. Date 31-Dec-2019 20-Jun-2022 24-May-2023 31-Dec-2023 The project also envisioned the strengthening of the Public Investment Management practices in the judiciary. However, so far, the investment and facility management application for the judiciary has not been rolled out yet. The technical specifications have been prepared for the procurement process but are Comments: still pending. This delay is due to the transfer of competence for procurement of these services from the MoJPA to the Central State Office for Digital Society, which are in charge for digitization of the public sector. This issue has been raised by the World Bank and will be followed up at the Steering Committee. Citizen Engagement IN01286542 ►Number of outreach events organized (citizen engagement indicator) (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 4.00 6/7/2023 Page 9 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) Date 31-Dec-2019 21-Nov-2022 24-May-2023 31-Dec-2023 Citizen engagement events organized (for instance, focus groups, court open days and workshops at select court sites). Participants will be surveyed regarding their satisfaction with the effectiveness of the citizen engagement process. Citizen engagement events will be organized during third and fourth quarter Comments: of 2023 (Kutina - October 2023, Zagreb II Phase - October 2023, Varaždin – March 2024, Vinkovci – May 2024) Performance-Based Conditions IN01286553 ►PBC 1 Implementation of a single digital window for LLCs (DLI 1) (Text, Output, 11,030,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 5 years A single digital window A single digital window that offers online The single digital window that offers online business Value business registration for -- for LLCs is not operational registration for LLCs is LLCs and simple LLCs is operational and in use. operational and in use. Date -- 13-Jun-2022 21-Apr-2023 -- Comments: 2020 DLR achieved, verified and EUR 2 mil. disbursed. IN01286554 ►PBC 2 Licensing requirements are published online, and selected licenses are digitalized (DLI 2) (Text, Output, 5,515,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 5 years There is no online There is no online There is no online informational licensing informational licensing informational licensing Value portal; 0 licenses published portal; 0 licenses portal; 0 licenses -- online/digitalized published published online/digitalized online/digitalized Date -- 13-Jun-2022 21-Apr-2023 -- IN01286555 ►PBC 3 Simplifying construction permitting (DLI 3a) (Text, Output, 11,030,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 5 years a. E-Dozvola platform is E-Dozvola platform E-Dozvola platform is not fully operational in reflects simplified operational in the city of Croatia, including in City construction permitting Value -- Zagreb of Zagreb. procedures and is b. Construction upgraded to include the permitting procedures “E-Construction Logbook” 6/7/2023 Page 10 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) have been simplified by and issuance of the use the ministry in charge of permit construction by introducing the e- Conference module in e- Dozvola platform. Date -- 13-Jun-2022 21-Apr-2023 -- Since the Doing Business Report was cancelled, the team relied on alternative data sources, such as the information provided by the Ministry of Construction, Physical Planning and State Assets. Accordingly, the verification protocol was revised as documented in the Project Operational Manual. The WB team also hired a Comments: Consultant who provided independent third party review and confirmed this information. Thus, verification process based on the revised POM has been completed and the confirmation package was submitted for disbursement. IN01286556 ►PBC 4 Increased uptake of e-Justice tools: a) First instance courts (misdemeanor depts. within municipal and administrative courts) that are integrated in ICMS; b) Courts using e-communication system (DLI4) (Text, Output, 5,515,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 5 years (I milestone): 19 (I milestone): 19 municipal municipal courts use e- courts use e- communication; and communication; and misdemeanour Misdemeanor departments misdemeanour departments within within municipal courts and departments within municipal courts, administrative courts are municipal courts, including including High not integrated in the ICMS High Misdemeanour Court Misdemeanour Court All commercial courts (9) integrated in ICMS integrated in ICMS integrated in ICMS (achieved, verified and (achieved, verified and disbursed).(II milestone): disbursed).(II milestone): Value All commercial courts use Additional 9 municipal -- Additional 9 municipal e-communication with courts – 31 courts in total courts – 31 courts in total lawyers, courts experts and use e-communication and use e-communication bankruptcy trustees. all (4) administrative and all (4) administrative courts and High courts and High 2 municipal courts use e- Administrative Court Administrative Court communication system. integrated in ICMS integrated in ICMS (achieved, verified by TPV (achieved, verified by and evidence package TPV and evidence submitted for package submitted for disbursement). disbursement). Date -- 25-Nov-2022 25-Nov-2022 -- (I milestone): 19 municipal courts use e-communication; and misdemeanour departments within municipal courts, including High Misdemeanour Court are integrated in ICMS (achieved, verified and EUR 2 mil. Comments: disbursed). (II milestone): Additional 9 municipal courts (31 in total) use e-communication; and all (4) administrative courts and High Administrative Court are integrated in ICMS (achieved, verified and pending completion of disbursement package). This DLI is fully achieved. IN01286557 ►PBC 5 Reduction of court backlog of cases older than 10 years (DLI 5) (Text, Output, 11,030,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 5 years 6/7/2023 Page 11 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) 20% reduction with Value 9131 cases 6292 cases 7909 cases respect to the baseline Date -- 31-Oct-2022 31-Dec-2022 -- (I Milestone): Verified (77,2% achievement-8426 cases) and partially disbursed (3,088 mil.) upon evidence and report presented by the MoJPA and courts at the end of 2020. The Annual Report on the judicial branch for 2021 presented by the president of the Supreme court (SC) before the Parliament informs of the significant increase of the aging case index and additional “inflow” of 13,669 cases to the backlog of older than 10 years. Despite the fact that the courts managed to resolve 13,805 cases during 2021, with reduced number of judges-especially at the first instance where most of the backlog resides- the result for 2021 kept the level of Comments: backlog as in 2020 (8,426 cases). The president of the SC requested the county courts to prepare a plan for reducing the cases older than 7 years and MOJPA has included this new target in the new strategy for development of judiciary (NRRP 2021-2026, National Plan for justice development 2022-2026). Better and closer monitoring mechanism of age structure has been put in place and it remains to be seen if the next milestone (20% reduction) will be achieved by the end of 2022, when the data comparable to the baseline will be available. IN01286558 ►PBC 6 Disposition time for the issuance of judicial decisions in cases before commercial courts (DLI 6) (Text, Output, 11,030,000.00, 0.00%) Baseline Actual (Previous) Actual (Current) 5 years 320 days Value 252 days 245 days -- Date -- 31-Oct-2022 31-Dec-2022 -- Disposition Time (DT) of commercial cases. The disposition time is measured from January 1 to December 31. MOJPA notified the Bank of the progress against the baseline and partial achievement of the 2021 DLR. Currently, MoJPA is updating the Report on the achievement based on the comments and guidance provided by the Bank team and once the package is completed, it will be submitted for disbursement. MOJPA has Comments: notified the Bank of the progress against the baseline and the target results in the first quarters of 2022. The current value of 218 days is based on the calculation of the court’s performance and includes performance data only for the first five months (January-May) in 2022. This is the main reason for the difference between the previous ISR, the current one and result reported on December 31, 2021. Next comparable data will be available at the end of this calendar year. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P167247 IBRD-90570 Effective USD 110.30 110.30 0.00 37.53 71.64 34% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P167247 IBRD-90570 Effective 31-Mar-2020 15-Apr-2020 29-Jun-2020 30-Jun-2025 30-Jun-2025 Cumulative Disbursements 6/7/2023 Page 12 of 13 The World Bank Implementation Status & Results Report Justice for Business Project (P167247) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 6/7/2023 Page 13 of 13