PROCUREMENT PLAN for SURP II General 1. Project Information Country: Federal Republic of Somalia Project Name: Somali Urban Resilience Project (SURP) Phase II Project Number: P170922 Total Finance: USD 112,000,000 2. Project Implementation Agencies: Ministry of Public Works, Benadir Regional Administration (BRA), Garowe Municipality, Kismayo Municipality, Baidoa Municipality 3. Date of Project Plan: October 2019 4. Period Covered by this Procurement: May 2020 to December 2021 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Document: The Bank’s standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified into Procurement Plan tables in STEP III. National Procurement Arrangements: Not applicable IV. Prequalification: Not applicable V. Leased Assets: Not Applicable VI. Procurement of Second hand Goods: Not Applicable 1 VII. Domestic Preference: Not Applicable VIII. Hands on Expanded Implementation Support (HEIS): Not Applicable IX. Other Relevant Procurement Information: Not Applicable X. Thresholds for Procurement Approaches and Method (US$ millions) Thresholds for Procurement Approaches and Methods (US$ millions)– Goods, Works, and Non-Consulting Services Category Prior Open Open Request for Review Internation National Quotation (US$ al (RfQ) millions) Works All ≥ 5.0 < 5.0 ≤ 0.2 Goods, IT, and all ≥ 0.5 < 0.5 ≤ 0.1 non-consulting services Thresholds for Procurement Approaches and Methods (US$, millions) – Consulting Services Category Prior Short List of National Consultants Review Consulting Services Engineering and (US$, Construction millions) Supervision Consultants all ≤ 0.1 ≤ 0.2 (Firms) Individual all n.a. n.a. Consultants 2 1) Baidoa Municipality Sr. Contract Estima Rev Marke Sele Evalua Procure Prequalifi Domes Expec Expected No Description ted iew t ctio tion ment cation tic ted date of Cost by Appro n Optio Process (Yes/ No) Prefer date Contract (US$) Ban ach Met ns (Single ence of bid/ Signatur k (Open- hod (BAFO stage- (Yes/N propo e (Pri Nation (RFP , single o) sal or/ al/ , Rated envelop openi Pos Limite RFB, Criteri e etc.) ng t) d etc.) RFQ a etc.) etc.) GOODS Procurement Lowest Single of Three 4WD Shoppi Evaluat stage 05/05/ 06/07/202 G1 80,000. Prior RFQ N/A N/A motor Vehicle ng ed One- 2020 0 00 pick ups Cost Envelop Survey and Lowest Single Laboratory 20,000. Shoppi Evaluat stage 07/07/ 09/09/202 G2 Prior RFQ N/A N/A equipment 00 ng ed One- 2020 0 Cost Envelop Hired vehicles for a period Lowest Single of time before 30,000. Shoppi Evaluat stage 04/07/ 31/12/202 G3 Prior RFQ N/A N/A the new 00 ng ed One- 2020 0 vehicles are Cost Envelop delivered Total Goods WORKS Construction of section Lowest Single Open 3,000,00 Evaluat stage 20/04/ 01/05/202 of Ali Prior Nation RFB N/A N/A W1 0 ed One- 2020 0 Amhar al Cost Envelop Road in 3 Baidoa Construction of Section Lowest Single Open of 30 KA 4,000,00 Evaluat stage 20/04/ 01/05/202 W2 Prior Nation RFB N/A N/A Road in 0 ed One- 2020 0 al Baidoa Cost Envelop Construction Lowest Single of Section Open 4,000,00 Evaluat stage 20/04/ 01/05/202 W3 of Hospital Prior Nation RFB N/A N/A 0 ed One- 2020 0 Road in al Cost Envelop Baidoa Lowest Construction 60.000.0 Shoppi Evaluat 01/03/20 01/04/202 01/06/ 01/08/202 W4 of RFQ N/A 0 Prior ng ed 20 0 2020 0 Laboratory Cost Total 12,070, Works 000 Non -Consulting Services – Not applicable Consulting Services Sr No. Contract Estimated Review Market Selection Shortlisti Expected Expected Descripti Cost by Bank Approach Method ng Date of Date of on (Prior/P (Open- (QCBS, (Yes/No) Bid Contract ost) National/ LCBCS, QBS, Proposal Signatur Limited etc.) DS Opening e Engineerin g 02/10/202 supervisio 1,500,000.00 Prior Open National QCBS N/A 01/11/2019 C1 1 n of Urban Roads M&E 02/02/202 C2 Survey 750,000.00 Prior Open National QCBS N/A 01/03/2020 1 (Base line, 4 Mid and Impact Control) Project 01/10/202 Direct C3 Coordinato 66,000.00 Prior CDS N/A 01/07/2020 1 Selection r Procureme 01/10/202 Direct C4 nt 46,000.00 Prior CDS N/A 01/07/2020 1 Selection Specialist Financial 01/10/202 Managem Direct 01/07/202 1 C5 46,000.00 Prior CDS N/A ent Selection 0 Specialist 01/10/202 Project Direct C6 Prior CDS N/A 01/07/2020 1 Engineer Selection 48,000.00 Social/Envi 01/10/202 Direct C7 ronmental 61,200.00 Prior CDS N/A 01/07/2020 1 Selection Specialist M&E 01/10/202 C8 42,000.00 Prior Open National INDV N/A 01/03/2020 Specialist 1 Communit 01/10/202 y Direct 1 C9 30,000.00 Prior CDS N/A 01/03/2020 Mobilizatio Selection n Officer Female 01/10/202 Communit 1 C10 y 30,000.00 Prior Open National INDV N/A 01/03/2020 Mobilizatio n Officer Total 2,619,200.0 Consultin 0 g Services Grand 14,926,200. Total 00 5 6 PROCUREMENT Somalia : Somalia Urban Resilience Project II PLAN General Information Country: Somalia 2019-12-21 Bank’s Approval Date of the Original Procurement Plan: 2024-06-06 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170922 GPN Date: Project Name: Somalia Urban Resilience Project II Loan / Credit No: IDA / D5310, TF / B1519, TF / B1409 Ministry of Public Works – PCU Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPWHR-184837-GO-RF Urban Infrastructure and Ser Request for Quota Single Stage - One E IDA / D5310 Prior Limited 70,000.00 17,040.00 Signed 2020-07-27 2020-10-16 2020-09-21 2020-11-17 2021-03-20 Q / Office furniture vices tions nvelope SO-MOPWHR-184834-GO-RF Urban Infrastructure and Ser Request for Quota Single Stage - One E Q / Office Equipment, Engine IDA / D5310 Prior Limited 50,000.00 0.00 Canceled 2020-07-27 2020-10-16 2020-09-21 2021-03-20 vices tions nvelope ering Tools and other M&E to ols. etc SO-MOPWHR-203683-GO-RF Project Management and Ca Request for Quota Single Stage - One E Q / Office Equipment, Engine IDA / D5310 Prior Limited 50,000.00 25,685.00 Signed 2020-11-16 2020-12-02 2021-01-11 2020-12-18 2021-07-10 pacity Building tions nvelope ering Tools and Other M & E Tools, etc SO-MOPWHR-215168-GO-RF Project Management and Ca Request for Quota Single Stage - One E Q / Supply and Delivery of 1N IDA / D5310 Prior Limited 60,000.00 46,490.00 Signed 2021-02-25 2021-03-18 2021-04-22 2021-06-24 2021-10-19 pacity Building tions nvelope o Motor Vehicle for PCU SO-MOPWHR-315253-GO-RF Q / Procurement and Deliver Project Management and Ca Request for Quota Single Stage - One E IDA / D5310 Prior Limited 11,000.00 0.00 Signed 2022-09-20 2022-09-19 2022-11-15 2022-10-17 2023-05-14 y of Additional Office Furnitur pacity Building tions nvelope e and Fittings for PCU SO-MOPWHR-397336-GO-RF Project Management and Ca Request for Quota Single Stage - One E Q / Engineering Equipment fo TF / B1409 Post Limited 30,000.00 0.00 Signed 2023-12-17 2023-12-13 2024-02-11 2024-01-02 2024-08-09 pacity Building tions nvelope r the capacity building suppo rt to MOPW SO-MOPWHR-317848-GO-RF Q / Procurement and Deliver Project Management and Ca Request for Quota Single Stage - One E IDA / D5310 Post Limited 6,600.00 0.00 Canceled 2022-11-27 2023-02-15 2023-01-22 2023-07-21 y of Additional Office Equipm pacity Building tions nvelope ent (2No Laptops) SO-MOPWHR-419044-GO-RF Project Management and Ca Request for Quota Single Stage - One E Q / Procurement and Deliver TF / B1409 Post Limited - National 8,500.00 0.00 Signed 2024-03-30 2024-04-08 2024-05-01 2024-06-30 pacity Building tions nvelope y of PCU Office Equipment (C OMPUTERS) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPWHR-187656-GO-RF Urban Infrastructure and Ser Request for Quota Single Stage - One E IDA / D5310 Prior Limited 66,000.00 185,580.00 Signed 2020-08-13 2020-09-02 2020-10-08 2020-09-25 2021-04-06 Q / PCU Office Rent vices tions nvelope SO-MOPWHR-215170-NC-RF Project Management and Ca Request for Quota Single Stage - One E Q / Provision of Office Compo IDA / D5310 Prior Open - National 60,000.00 170,400.00 Signed 2021-02-05 2021-04-02 2021-06-30 2021-09-29 pacity Building tions nvelope und Guarding Services for PC U SO-MOPWHR-297213-NC-DI R / Output Based Agreement Contingent Emergency Resp IDA / D5310 Prior Direct Selection Direct 20,000,000.00 20,000,000.00 Signed 2022-05-31 2022-08-07 2022-06-05 2022-08-10 2022-07-10 2022-10-21 2023-01-06 (OBA) for Delivery of Drought onse Response in Selected SURP-II PIUs SO-MOPWHR-374375-CS-CD S / Consultancy services for t he Preparation of Feasibility Project Management and Ca Direct - Internation Studies, Detailed Engineering TF / B1409 Prior Direct Selection 2,000,000.00 0.00 Signed 2023-08-01 2023-08-07 2023-08-04 2023-08-08 2023-10-01 2023-12-07 2024-07-31 pacity Building al designs, and Bid Documents for Urban Infrastructure Work s in Dhusamareb and Beledw eyne. SO-MOPWHR-430364-NC-DI R / Preparation for Baidoa Ur ban Flood Risk and City-wide Stormwater Drainage Assess Urban Infrastructure and Ser Direct - Internation Pending Impl TF / B1409 Prior Direct Selection 1,250,000.00 0.00 2024-05-30 2024-06-04 2024-07-09 2025-01-05 ment, Feasibility Study and D vices al ementation etailed Engineering Designs as well Detailed Engineering Designs and Bid Documents f or Northern Link Road In Baid oa CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPWHR-174596-CS-CQ Urban Infrastructure and Ser Consultant Qualifi IDA / D5310 Prior Open - National 60,000.00 0.00 Canceled 2020-05-21 2020-06-11 2020-07-25 2020-08-24 2020-09-28 2021-03-27 S / Gender Based Violence (G vices cation Selection BV) SO-MOPWHR-204006-CS-CQ S / Institutional Assessment o Project Management and Ca Consultant Qualifi IDA / D5310 Prior Open - National 200,000.00 0.00 Canceled 2020-11-14 2020-11-12 2020-12-05 2021-01-18 2021-02-17 2021-03-24 2021-09-20 f Dhusamareeb and Beledwe pacity Building cation Selection yne Municipalities (New Citie s) Page 1 SO-MOPWHR-205146-CS-CQ S / Institutional Assessment o Project Management and Ca Consultant Qualifi Open - Internationa IDA / D5310 Post 200,000.00 0.00 Canceled 2020-11-19 2020-11-17 2020-12-10 2020-11-26 2021-01-23 2021-02-17 2021-02-22 2021-03-29 2021-09-25 f Dhusamereeb and Beledwe pacity Building cation Selection l yne Municipalities (New Citie s) SO-MOPWHR-204598-CS-QC BS / Baseline Survey for SUR Project Management and Ca Quality And Cost- IDA / D5310 Post Open - National 600,000.00 0.00 Canceled 2020-11-19 2020-11-19 2020-12-10 2020-11-26 2021-01-23 2021-02-13 2021-02-20 2021-03-17 2021-03-22 2021-04-28 2021-04-26 2021-05-31 2022-05-31 P-II in Mogadishu, Kismayo, B pacity Building Based Selection aidoa and Garowe Municipalit ies SO-MOPWHR-204959-CS-QC BS / Urban Infrastructure Nee Project Management and Ca Quality And Cost- Open - Internationa IDA / D5310 Post 400,000.00 0.00 Canceled 2020-11-19 2020-11-18 2020-12-10 2020-11-26 2021-01-23 2021-02-16 2021-02-20 2021-03-17 2021-03-22 2021-04-26 2021-05-31 2022-05-31 ds Assessment of Dhusamare pacity Building Based Selection l eb and Beledweyne Municipa lities (New Cities) SO-MOPWHR-256297-CS-QC BS / Baseline Survey of Soma Project Management and Ca Quality And Cost- Open - Internationa lia Urban Resilience Project P IDA / D5310 Prior 300,000.00 270,941.50 Signed 2021-10-05 2021-10-27 2021-10-26 2021-10-30 2021-12-09 2021-12-23 2022-01-06 2022-01-31 2022-02-05 2022-04-25 2022-03-12 2022-07-20 2022-04-16 2022-09-10 2023-04-16 pacity Building Based Selection l hase Two (SURPP-II) in Garow e, Kismayo and Baidoa Munic ipalities SO-MOPWHR-258795-CS-QC BS / Institutional and Urban I Project Management and Ca Quality And Cost- Open - Internationa nfrastructure Needs Assessm IDA / D5310 Prior 400,000.00 0.00 Canceled 2021-10-21 2021-10-27 2021-11-11 2021-10-30 2021-12-25 2021-12-24 2022-01-22 2022-01-31 2022-02-21 2022-05-18 2022-03-28 2022-05-02 2023-05-02 pacity Building Based Selection l ent of Dhusamareeb and Bel edweyne Municipalities (New cities) SO-MOPWHR-375190-CS-QC BS / Urban Flood Risk and Cit Project Management and Ca Quality And Cost- Open - Internationa Under Implement TF / B1409 Prior 800,000.00 0.00 2023-08-01 2023-08-03 2023-08-05 2023-08-08 2023-09-09 2023-12-20 2023-10-07 2024-01-25 2023-11-06 2024-05-27 2023-12-05 2024-01-09 2024-06-30 y-Wide Stormwater Drainage pacity Building Based Selection l ation Assessment for Beledweyne and Dhusamareb SO-MOPWHR-419069-CS-CQ S / Procurement of Consultan Project Management and Ca Consultant Qualifi Under Implement cy Services (Firm) for NAGA TF / B1409 Post Limited - National 150,000.00 0.00 2024-03-31 2024-04-09 2024-04-01 2024-05-01 2024-04-16 2024-05-07 2024-11-03 pacity Building cation Selection ation AD Project Website developm ent and MIS Integration INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPWHR-151240-CS-CD Urban Infrastructure and Ser IDA / D5310 Prior Direct Selection Direct 144,000.00 414,000.00 Signed 2019-12-23 2019-12-27 2020-01-02 2020-01-13 2020-03-07 2020-03-28 2020-09-03 S / Program Coordinator vices SO-MOPWHR-172384-CS-IND Urban Infrastructure and Ser Individual Consult IDA / D5310 Prior Open 65,000.00 146,000.00 Completed 2020-05-13 2020-05-20 2020-07-01 2020-09-22 2020-07-22 2020-10-07 2020-08-26 2020-10-24 2021-02-22 2022-01-17 V / Financial Management Sp vices ant Selection ecialist SO-MOPWHR-172386-CS-IND Urban Infrastructure and Ser Individual Consult IDA / D5310 Prior Open 91,000.00 280,000.00 Signed 2020-05-13 2020-05-21 2020-07-01 2020-09-22 2020-07-22 2020-10-07 2020-08-26 2020-10-28 2021-02-22 V / Procurement Specialist vices ant Selection SO-MOPWHR-172389-CS-IND Urban Infrastructure and Ser Individual Consult IDA / D5310 Prior Open 60,000.00 0.00 Canceled 2020-05-13 2020-07-01 2020-07-22 2020-08-26 2021-02-22 V / Gender Specialist vices ant Selection SO-MOPWHR-172392-CS-IND Urban Infrastructure and Ser Individual Consult TF / B1519 Prior Open 60,000.00 140,000.00 Terminated 2020-05-13 2020-05-12 2020-07-01 2020-09-22 2020-07-22 2020-10-07 2020-08-26 2020-10-24 2021-02-22 V / Monitoring & Evaluation S vices ant Selection pecialist SO-MOPWHR-172382-CS-IND Urban Infrastructure and Ser Individual Consult V / Environmental & Social S IDA / D5310 Prior Open 60,000.00 284,000.00 Signed 2020-05-14 2020-05-20 2020-07-02 2020-09-23 2020-07-23 2020-10-07 2020-08-27 2020-10-15 2021-02-23 vices ant Selection afeguards Specialist SO-MOPWHR-177459-CS-IND Urban Infrastructure and Ser Individual Consult IDA / D5310 Prior Limited 48,000.00 24,460.00 Completed 2020-06-06 2020-06-22 2020-06-11 2020-08-26 2020-07-02 2020-08-31 2020-08-06 2020-09-05 2021-02-02 2021-01-05 V / Special Project Advisor vices ant Selection SO-MOPWHR-203684-CS-IND V / Informal Settlement Upgr Project Management and Ca Individual Consult IDA / D5310 Prior Limited 25,000.00 22,250.00 Signed 2020-11-10 2020-11-23 2020-11-15 2020-11-17 2020-12-06 2020-12-12 2021-01-10 2020-12-31 2021-07-09 ading Advisor to the Technic pacity Building ant Selection al Assistance (TA) Firm SO-MOPWHR-203686-CS-IND Project Management and Ca Individual Consult IDA / D5310 Prior Limited 24,000.00 83,760.00 Signed 2020-11-10 2020-11-13 2020-11-15 2020-11-17 2020-12-06 2020-12-18 2021-01-10 2020-12-28 2021-07-09 V / PCU Administrative Assist pacity Building ant Selection ant SO-MOPWHR-175672-CS-CQ Urban Infrastructure and Ser Individual Consult S / Gender Based Violence (G IDA / D5310 Prior Open 60,000.00 0.00 Canceled 2020-05-28 2020-05-27 2020-07-16 2020-08-06 2020-09-10 2021-03-09 vices ant Selection BV) Specialist SO-MOPWHR-215163-CS-IND Project Management and Ca Individual Consult V / Gender Based Violence (G IDA / D5310 Prior Open 60,000.00 173,280.00 Signed 2021-01-30 2021-02-10 2021-03-20 2021-07-22 2021-04-10 2021-08-04 2021-05-15 2021-09-02 2021-11-11 pacity Building ant Selection BV) Specialist SO-MOPWHR-215164-CS-IND Project Management and Ca Individual Consult IDA / D5310 Prior Open 90,000.00 296,000.00 Signed 2021-02-02 2021-02-09 2021-03-23 2021-06-16 2021-04-13 2021-06-24 2021-05-18 2021-07-27 2021-11-14 V / Project Engineer for PCU pacity Building ant Selection SO-MOPWHR-217502-CS-IND Project Management and Ca Individual Consult V / Monitoring & Evaluation S IDA / D5310 Prior Open 90,000.00 0.00 Canceled 2021-02-09 2021-02-09 2021-03-30 2021-04-20 2021-05-25 2021-11-21 pacity Building ant Selection pecialist for PCU SO-MOPWHR-217503-CS-IND Project Management and Ca Individual Consult IDA / D5310 Prior Open 73,500.00 73,380.00 Signed 2021-02-08 2021-02-15 2021-03-29 2021-05-31 2021-04-19 2021-06-11 2021-05-24 2021-07-03 2021-11-20 V / Special Project Advisor pacity Building ant Selection SO-MOPWHR-241749-CS-IND Project Management and Ca Individual Consult V / Engagement of Environm IDA / D5310 Prior Limited 6,000.00 9,000.00 Signed 2021-07-08 2021-07-21 2021-07-13 2021-07-24 2021-08-03 2021-09-01 2021-09-07 2021-09-29 2022-03-06 pacity Building ant Selection enal Safeguards Specialist (S TC) SO-MOPWHR-241754-CS-IND Project Management and Ca Individual Consult V / Engagement of Social Saf IDA / D5310 Prior Limited 6,000.00 9,000.00 Signed 2021-07-08 2021-07-21 2021-07-13 2021-07-24 2021-08-03 2021-09-01 2021-09-07 2021-09-29 2022-03-06 pacity Building ant Selection eguards Specialist (SPC) SO-MOPWHR-242520-CS-IND Project Management and Ca Individual Consult V / Engagement of ToR Devel IDA / D5310 Prior Limited 8,000.00 12,000.00 Signed 2021-07-10 2021-07-21 2021-07-15 2021-07-24 2021-08-05 2021-09-01 2021-09-09 2021-09-29 2022-03-08 pacity Building ant Selection opment Consultant (Short Te rm) SO-MOPWHR-246169-CS-IND Project Management and Ca Individual Consult IDA / D5310 Prior Open 110,000.00 87,480.00 Signed 2021-07-31 2021-08-25 2021-09-18 2021-12-09 2021-10-09 2021-12-21 2021-11-13 2022-01-10 2022-05-12 V / PCU M&E Specialist pacity Building ant Selection Page 2 SO-MOPWHR-270241-CS-IND Project Management and Ca Individual Consult V / PCU Financial Manageme IDA / D5310 Prior Direct 150,000.00 146,000.00 Signed 2021-12-23 2021-12-22 2022-01-02 2021-12-28 2022-01-23 2022-01-06 2022-02-27 2022-01-29 2022-08-26 pacity Building ant Selection nt Specialist SO-MOPWHR-294869-CS-IND Project Management and Ca Individual Consult V / Special Project Advisor to IDA / D5310 Prior Open 74,000.00 0.00 Canceled 2022-05-15 2022-07-03 2022-07-24 2022-08-28 2023-02-24 pacity Building ant Selection the Minister SO-MOPWHR-337600-CS-IND Project Management and Ca Individual Consult V / Special Project Advisor to TF / B1409 Prior Open - National 75,000.00 0.00 Signed 2023-01-24 2023-01-23 2023-03-14 2023-07-03 2023-04-04 2023-07-09 2023-05-09 2023-07-22 2023-11-05 pacity Building ant Selection the Minister SO-MOPWHR-386111-CS-IND Project Management and Ca Individual Consult Open - Internationa Under Implement TF / B1409 Prior 91,000.00 0.00 2023-10-06 2023-10-13 2023-11-24 2023-12-07 2024-01-11 2024-07-09 V / Procurement Specialist pacity Building ant Selection l ation SO-MOPWHR-394145-CS-CD S / Preparation of Feasibility Studies, Detailed Engineering Project Management and Ca Direct - Internation TF / B1409 Prior Direct Selection 2,000,000.00 0.00 Canceled 2023-11-20 2023-11-26 2023-12-15 2024-01-19 2024-07-17 Designs, and Bid Documents pacity Building al for Urban Infrastructure Work s in Beledweyne and Dhusam areeb Municipalities SO-MOPWHR-419074-CS-IND Project Management and Ca Individual Consult Pending Impleme TF / B1409 Post Open - National 75,000.00 0.00 2024-03-30 2024-05-14 2024-05-24 2024-06-10 2024-12-07 V / PCU Communication Spec pacity Building ant Selection ntation ialist SO-MOPWHR-419042-CS-IND Project Management and Ca Individual Consult V / SPECIAL PROJECT ADVISO TF / B1409 Post Open - National 75,000.00 0.00 Canceled 2024-04-08 2024-05-17 2024-05-22 2024-06-10 2024-12-07 pacity Building ant Selection R TO THE MINISTER SO-MOPWHR-419043-CS-IND Project Management and Ca Individual Consult TF / B1409 Post Direct - National 110,000.00 0.00 Signed 2024-04-08 2024-04-09 2024-04-17 2024-04-23 2024-04-20 2024-04-25 2024-05-06 2024-11-02 V / PCU M/E Specialist pacity Building ant Selection SO-MOPWHR-427568-CS-IND Project Management and Ca Individual Consult Under Implement V / SPECIAL PROJECT ADVISO TF / B1409 Prior Direct - National 75,000.00 0.00 2024-05-17 2024-05-29 2024-05-27 2024-06-01 2024-05-30 2024-06-07 2024-12-04 pacity Building ant Selection ation R TO THE MINISTER Page 3