Procurement Plan Sustainable Rural Water Supply and Sanitation Project PROCUREMENT Kyrgyz Republic : Sustainable Rural Water Supply and Sanitation Project PLAN General Information Country: Kyrgyz Republic Bank’s Approval Date of the Original Procurement Plan: 2017-02-08 Revised Plan Date(s): (comma delineated, leave blank if2024-06-05 none) Project ID: P154778 GPN Date: Project Name: Sustainable Rural Water Supply and Sanitation Project Loan / Credit No: TF / A1605, IDA / D1380, IDA / 59070, IDA / D2040, IDA / 60880, IDA / 74700 Community Development and Investment Agency Executing Agency(ies): WORKS Activity Reference No. Procurem Actual A Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio High SEA/SH Process Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission Contract Compl / Description Component Review Type Method ent Docu mount ( rt and Recommenda Signed Contract No. ch ocess n (Y/N) Risk Status n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes etion ment Typ US$) tion for Award e Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne Actu d al IDA-SRWSSDP-CW-17-1 / Single Stage - On 414,322.0 Complete 2016-12-3 2017-01-0 2017-02-1 2017-04-1 2017-04-2 2017-05-1 2017-06-1 2017-11- 2019- Rehabilitation of water sup IDA / 59070 Water Supply Investments Prior Request for Bids Open - National e Envelope 1 d 0 4 5 1 7 6 3 12 09-07 ply system in Togotoi IDA-SRWSSDP-CW-2017-2 Single Stage - On 3,484,396 Complete 2017-05-1 2017-05-0 2017-05-2 2017-07-0 2017-06-0 2017-08-0 2017-07-2 2017-09-0 2017-09-0 2018-03- 2019- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .44 d 6 5 1 2 5 1 0 5 3 04 06-05 pply system in Kyrgyz-Ata (5 lots) IDA-SRWSSDP-CW-2017-3 Single Stage - On 2,300,631 Complete 2017-05-1 2017-04-2 2017-05-2 2017-07-0 2017-05-2 2017-08-0 2017-07-2 2017-09-0 2017-09-0 2018-03- 2020- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .35 d 6 8 1 2 9 1 0 5 3 04 07-05 pply system in Sultan (3lo ts) IDA-SRWSSDP-CW-2017-4 Single Stage - On 2,476,062 Complete 2017-05-1 2017-05-0 2017-05-2 2017-07-0 2017-06-0 2017-08-0 2017-07-2 2017-09-0 2017-09-0 2018-03- 2019- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .26 d 6 5 1 2 5 1 1 5 3 04 06-05 pply system in Panfilovka (3 lots) IDA-SRWSSDP-CW-2017-6 Single Stage - On 1,582,371 Complete 2017-12-0 2018-02-0 2017-12-0 2018-01-1 2018-03-1 2018-02-1 2018-04-2 2018-03-2 2018-06-1 2018-09- 2020- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .95 d 1 9 6 7 3 6 0 3 2 19 07-15 pply system in Alekseevk a IDA-SRWSSDP-CW-2018-7 Single Stage - On 943,824.6 Complete 2018-01-2 2018-05-0 2018-02-0 2018-03-1 2018-06-1 2018-04-1 2018-07-1 2018-05-2 2018-09-1 2018-11- 2019- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 7 d 9 4 3 7 9 6 1 1 1 17 11-14 pply system in Kyzyl-Tuu IDA-SRWSSDP-CW-2018-8 Single Stage - On 1,311,126 Complete 2018-01-2 2018-05-0 2018-02-0 2018-03-1 2018-06-0 2018-04-1 2018-07-1 2018-05-2 2018-09-1 2018-11- 2021- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope .88 d 9 4 3 7 7 6 1 1 1 17 06-18 pply system in Kun-Tuu IDA-SRWSSDP-CW-2018-9 Single Stage - On 480,923.0 Terminate 2018-07-0 2018-09-0 2018-07-0 2018-08-1 2018-10-1 2018-09-1 2019-01-2 2018-10-2 2019-03-1 2019-04- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 8 d 1 7 6 7 8 6 5 1 8 19 pply system in Darkan IDA-SRWSSDP-CW-2018-1 Single Stage - On 509,569.5 Complete 2018-07-0 2018-09-0 2018-07-0 2018-08-1 2018-10-1 2018-09-1 2019-01-2 2018-10-2 2019-03-1 2019-04- 2019- 0 / Rehabilitation of water IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 0 d 1 3 6 7 8 6 5 1 8 19 12-30 supply system in Chelpek IDA-SRWSSDP-CW-2018-1 Single Stage - On 403,830.4 Complete 2018-08-2 2019-07-2 2018-09-0 2018-10-1 2019-09-0 2018-11-1 2019-10-1 2018-12-1 2019-12-1 2019-06- 2021- 1 / Rehabilitation of water IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 2 d 9 6 3 5 4 4 5 9 1 17 09-15 supply system in Sary-Tas h IDA-SRWSSDP-CW-2018-1 Single Stage - On 527,664.6 Complete 2018-08-2 2019-07-2 2018-09-0 2018-10-1 2019-09-0 2018-11-1 2019-10-1 2018-12-1 2019-12-0 2019-06- 2021- 2 / Rehabilitation of water IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 0 d 9 6 3 5 4 4 5 9 9 17 10-15 supply system in Achyk-S uu IDA-SRWSSDP-CW-2018-1 Pending I Single Stage - On 2018-08-2 2018-09-0 2018-10-1 2018-11-1 2018-12-1 2019-06- 4 / Rehabilitation of water IDA / D2040 Water Supply Investments Post Request for Bids Open - National 0.00 mplement e Envelope 9 3 5 4 9 17 supply system in Otuz Ady ation r IDA-SRWSSDP-CW-2018-1 Single Stage - On 368,970.7 Complete 2018-03-0 2018-02-0 2018-03-0 2018-04-1 2018-03-1 2018-05-1 2018-04-2 2018-06-2 2018-06-0 2018-12- 2019- 6 / Rehabilitation of water IDA / D2040 Water Supply Investments Post Request for Bids Open - National e Envelope 3 d 2 7 7 8 3 8 0 2 7 19 08-10 supply system in Tolok SRWSSDP-SHOPPING-WO Institutional Strengthenin Request for Quo Single Stage - On Complete 2018-04-3 2018-06-2 2018-05-0 2018-12- 2018- IDA / D1380 Post Open - National 2,807.86 RKS-2018-1 / Renovation g tations e Envelope d 0 5 7 22 07-02 work for DWWSD IDA-SRWSSDP-SW-2018-1 / Rehabiltation of public co Request for Quo Single Stage - On 104,536.8 Complete 2018-06-1 2018-06-2 2018-08-1 2018-09-2 2019-02- 2019- IDA / 59070 Sanitation Development Post Limited nveniences in schools (inte tations e Envelope 0 d 5 9 0 6 06 07-11 rnal toilets) in Osh oblast IDA-SRWSSDP-SW-2018-2 / Rehabiltation of public co Request for Quo Single Stage - On Complete 2018-06-1 2018-11-2 2018-08-1 2019-03-0 2019-02- 2019- IDA / D1380 Sanitation Development Post Limited 66,563.69 nveniences in schools of C tations e Envelope d 5 0 0 3 06 09-29 huy oblast (inner toilets) IDA-SRWSSDP-AF-CW-201 Single Stage - On 481,348.4 Complete 2018-09-0 2019-08-2 2018-09-1 2018-10-2 2019-09-2 2018-11-2 2019-10-2 2018-12-3 2019-12-1 2019-12- 2021- 8-15 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 1 d 6 3 4 6 5 5 9 0 8 30 05-25 er supply system in Tamga IDA-SRWSSDP-AF-CW-19- Single Stage - On 990,872.0 Complete 2019-02-1 2019-02-1 2019-02-2 2019-04-0 2019-03-1 2019-05-0 2019-05-1 2019-06-0 2019-07-1 2019-12- 2021- 18 / Rehabilitation of wate IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 0 d 5 5 0 3 9 3 4 7 8 04 09-15 r supply system in Korul (2 Lots) IDA-SRWSSDP-AF-CW-18- Single Stage - On 481,621.3 2019-06-0 2019-07-2 2019-06-1 2019-07-1 2019-09-0 2019-08-1 2019-10-1 2019-09-2 2019-12-1 2020-09- 18 / Rehabilitation of wate IDA / 59070 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 7 3 6 7 7 4 6 5 0 9 19 r supply system in Ak-Bula k IDA-SRWSSDP-AF-CW-201 Single Stage - On 2018-09-1 2019-02-1 2018-09-2 2018-11-0 2019-03-1 2018-12-0 2019-01-0 2020-01- 8-17 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 1 5 1 2 9 2 6 06 er supply system in Ichke- Bulun IDA-SRWSSDP-AF-CW-202 Single Stage - On 232,976.3 Complete 2020-01-2 2020-01-3 2020-02-0 2020-03-1 2020-03-0 2020-04-1 2020-05-0 2020-05-2 2020-06-1 2021-05- 2022- 0-19 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 8 d 7 0 3 6 3 5 7 0 1 20 07-04 er supply system in Belek IDA-SRWSSDP-AF-CW-202 Single Stage - On 298,422.6 Complete 2020-01-2 2020-01-3 2020-02-0 2020-03-1 2020-03-0 2020-04-1 2020-05-0 2020-05-2 2020-06-1 2021-05- 2021- 0-20 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 6 d 7 0 3 6 3 5 7 0 1 20 11-08 er supply system in Shalta IDA-SRWSSDP-SW-2018-4 Request for Quo Single Stage - On Complete 2018-06-1 2018-12-1 2018-08-1 2019-02-2 2019-02- 2019- / Rehabilitation SES of Tok IDA / D1380 Sanitation Development Post Limited 2,226.08 tations e Envelope d 5 1 0 2 06 03-23 mok rayon Chui oblast IDA-SRWSSDP-SW-2018-3 Request for Quo Single Stage - On Complete 2018-06-1 2018-11-2 2018-08-1 2019-02-0 2019-02- 2019- / Rehabilitation SES of Alay IDA / D1380 Sanitation Development Post Limited 1,296.78 tations e Envelope d 5 0 0 6 06 03-10 rayon Osh oblast IDA-SRWSSDP-SW-2018-5 Request for Quo Single Stage - On Complete 2018-06-0 2019-07-1 2018-08-0 2019-09-1 2019-01- 2019- / Rehabilitation SES of Ak- IDA / D1380 Sanitation Development Post Limited 1,492.53 tations e Envelope d 8 2 3 6 30 10-15 Suu rayon Issyk-Kul oblast IDA-SRWSSDP-SW-2018-6 Request for Quo Single Stage - On Complete 2018-06-0 2018-11-2 2018-08-0 2019-02-0 2019-01- 2019- / Rehabilitation SES of Jeti- IDA / D1380 Sanitation Development Post Limited 1,902.71 tations e Envelope d 8 0 3 5 30 03-08 Oguz rayon Issyk-Kul oblas t IDA-SRWSSDP-SW-2018-7 Request for Quo Single Stage - On Complete 2018-06-0 2018-11-2 2018-08-0 2019-02-0 2019-01- 2019- / Rehabilitation SES of Sok IDA / D1380 Sanitation Development Post Limited 2,799.35 tations e Envelope d 8 0 3 4 30 03-04 uluk rayon Chui oblast IDA-SRWSSDP-SW-2018-1 Request for Quo Single Stage - On Complete 2018-06-0 2018-12-1 2018-08-0 2019-02-2 2019-01- 2019- 0 / Rehabilitation SES of Pa IDA / D1380 Sanitation Development Post Limited 2,172.64 tations e Envelope d 8 1 3 0 30 03-21 nfilov rayon Chui oblast IDA-SRWSSDP-SW-2018-8 Request for Quo Single Stage - On Complete 2018-06-0 2018-12-1 2018-08-0 2019-02-2 2019-01- 2019- / Rehabilitation SES of Mos IDA / D1380 Sanitation Development Post Limited 2,044.16 tations e Envelope d 8 1 3 0 30 03-21 kva rayon Chui oblast IDA-SRWSSDP-SW-2018-9 Request for Quo Single Stage - On Complete 2018-06-0 2018-12-1 2018-08-0 2019-02-2 2019-01- 2019- / Rehabilitation SES of Jayil IDA / D1380 Sanitation Development Post Limited 2,757.38 tations e Envelope d 8 1 3 0 30 03-21 rayon Chui oblast IDA-SRWSSDP-SW-2019-1 Request for Quo Single Stage - On Complete 2019-05-0 2019-05-2 2019-07-0 2019-09-0 2019-12- 2020- / Rehabiltation of public co IDA / D1380 Sanitation Development Post Limited 92,102.52 tations e Envelope d 8 9 3 2 30 07-04 nveniences in schools in C hui oblast (2nd phase) IDA-SRWSSDP-SW-2019-2 / Rehabiltation of public co Request for Quo Single Stage - On Complete 2019-05-0 2019-05-2 2019-07-0 2019-08-3 2019-12- 2019- IDA / D1380 Sanitation Development Post Limited 48,414.87 nveniences in schools in Is tations e Envelope d 8 9 3 0 30 12-30 syk-Kul oblast (2nd phase) IDA-SRWSSDP-AF-CW-202 Single Stage - On 190,853.9 2020-02-1 2020-02-2 2020-02-2 2020-04-0 2020-05-1 2020-05-0 2020-06-0 2020-06-0 2020-07-2 2021-06- 0-21 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 9 8 0 3 5 2 5 4 9 8 09 er supply system in Chon- Daly IDA-SRWSSDP-DC-CW-20- 1 / Extra works for rehabili Complete 2020-03-1 2020-03-2 2020-03-2 2020-03-2 2020-05-0 2020-05-1 2020-09- 2020- IDA / 59070 Water Supply Investments Post Direct Selection Direct 80,908.48 tation of water supply syst d 8 5 3 6 2 8 01 12-31 em in Kyrgyz-Ata subproje ct IDA-SRWSSDP-DC-CW-20- 2 / Direct contract fo comp 414,547.4 Complete 2020-04-1 2020-04-2 2020-04-1 2020-04-2 2020-05-1 2020-06-1 2020-11- 2020- IDA / 59070 Water Supply Investments Post Direct Selection Direct letion of works in subproje 6 d 0 8 7 9 8 2 14 12-17 ct Darkhan, Jeti-Oguz, Issy k-Kul IDA-SRWSSDP-AF-CW-202 Single Stage - On 453,181.9 Complete 2020-04-3 2020-04-2 2020-05-0 2020-06-1 2020-06-0 2020-07-1 2020-06-2 2020-08-1 2020-07-2 2021-11- 2021- 0-22 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 7 d 0 9 1 2 2 2 9 6 7 19 10-26 er supply system in Chaich y IDA-SRWSSDP-AF-CW-202 Single Stage - On 501,808.1 2020-06-1 2020-06-0 2020-06-1 2020-07-3 2020-07-0 2020-08-3 2020-08-2 2020-10-0 2020-10-0 2021-10- 0-23 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 4 2 4 9 1 7 0 6 4 6 04 er supply system in Kenes h IDA-SRWSSDP-AF-CW-202 Single Stage - On 201,497.9 2020-06-1 2020-06-0 2020-06-1 2020-07-2 2020-07-0 2020-08-2 2020-08-1 2020-10-0 2020-09-2 2021-05- 0-24 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 5 0 9 7 9 8 8 4 2 2 30 er supply system in Kara- dobo IDA-SRWSSDP-AF-CW-202 Single Stage - On 326,383.1 Complete 2020-07-0 2020-07-0 2020-07-1 2020-08-2 2020-08-0 2020-09-2 2020-09-0 2020-10-3 2020-10-1 2022-02- 2022- 0-25 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 1 d 1 2 5 6 4 5 8 0 2 02 01-13 er supply system in Kenes h Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 238,324.8 Complete 2020-07-0 2020-07-0 2020-07-1 2020-08-2 2020-08-0 2020-09-2 2020-09-0 2020-10-3 2020-10-1 2022-02- 2022- 0-26 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 6 d 1 2 5 6 4 5 8 0 2 02 01-13 er supply system in Por IDA-SRWSSDP-AF-CW-202 Single Stage - On 497,949.8 2020-11-1 2020-08-1 2020-11-2 2021-01-0 2020-09-1 2021-02-0 2020-09-2 2021-03-1 2020-11-0 2022-06- 0-29 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 2 1 4 5 6 1 5 2 2 3 15 er supply system in Gorna ya Maevka IDA-SRWSSDP-AF-CW-202 Single Stage - On 347,104.8 Complete 2020-11-1 2020-10-1 2020-11-2 2021-01-0 2020-11-1 2021-02-0 2020-12-1 2021-03-1 2021-02-0 2022-06- 2022- 0-30 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National e Envelope 2 d 1 5 5 6 7 5 8 2 2 15 08-31 er supply system in Beish eke IDA-SRWSSDP-AF-CW-202 Single Stage - On 666,380.9 2020-11-2 2020-11-1 2020-12-0 2021-01-1 2020-12-1 2021-02-1 2021-01-2 2021-03-2 2021-03-2 2022-06- 0-31 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 7 0 2 4 5 5 4 2 1 0 24 er supply system in Ken-B ulun IDA-SRWSSDP-AF-CW-18- Single Stage - On 365,328.7 Complete 2019-07-1 2019-07-1 2019-07-2 2019-09-0 2019-08-0 2019-10-0 2019-09-0 2019-11-1 2019-09-1 2020-11- 2020- 17 / Rehabilitation of wate IDA / 59070 Water Supply Investments Post Request for Bids Open - National e Envelope 2 d 9 2 8 8 9 8 2 2 0 11 09-19 r supply system in Ichke-B ulun IDA-SRWSSDP-SW-2020-1 1 / Rehabiltation of public Request for Quo Single Stage - On 129,549.4 Complete 2020-05-2 2020-07-1 2020-10-0 2021-01- 2021- IDA / 60880 Sanitation Development Post Open - National conveniences in schools in tations e Envelope 6 d 0 5 3 11 01-31 Chui oblast (1st phase) IDA-SRWSSDP-SW-2020-9 / Rehabiltation of public co Request for Quo Single Stage - On 2020-05-2 2020-07-1 2020-10-1 2021-01- IDA / 60880 Sanitation Development Post Open - National 45,124.23 Signed nveniences in schools in Is tations e Envelope 0 5 2 11 syk-Kul oblast (1st phase) IDA-SRWSSDP-SW-2020-1 Request for Quo Single Stage - On 2020-05-2 2020-07-1 2020-10-1 2021-01- 0 / Rehabiltation of public IDA / 60880 Sanitation Development Post Open - National 31,496.41 Signed tations e Envelope 0 5 4 11 conveniences in schools in Osh oblast (1st phase) IDA-SRWSSDP-SW-2020-2 Request for Quo Single Stage - On 2020-06-1 2020-08-1 2020-10-1 2021-02- / Rehabilitation SES of Issy IDA / 60880 Sanitation Development Post Open - National 1,598.85 Signed tations e Envelope 7 2 4 08 k-Ata rayon Chui oblast IDA-SRWSSDP-SW-2020-3 Request for Quo Single Stage - On 2020-06-1 2020-08-1 2020-10-0 2021-02- / Rehabilitation SES of Cho IDA / 60880 Sanitation Development Post Open - National 856.84 Signed tations e Envelope 7 2 4 08 n-Alai rayon Osh oblast IDA-SRWSSDP-SW-2020-4 Request for Quo Single Stage - On Complete 2020-09-0 2020-11-0 2020-11-2 2021-05- 2020- / Rehabilitation SES of Ton IDA / 60880 Sanitation Development Post Open - National 2,157.80 tations e Envelope d 9 4 1 03 12-31 rayon Issyk-Kul oblast IDA-SRWSSDP-SW-2020-5 Request for Quo Single Stage - On Complete 2020-09-0 2020-11-0 2020-11-2 2021-05- 2020- / Rehabilitation SES of Ke IDA / 60880 Sanitation Development Post Open - National 2,633.52 tations e Envelope d 9 4 8 03 12-31 min rayon Chui oblast IDA-SRWSSDP-SW-2020-6 Under Imp Request for Quo Single Stage - On 2020-06-1 2020-08-1 2021-02- / Rehabilitation SES of Kar IDA / 60880 Sanitation Development Post Open - National 0.00 lementati tations e Envelope 7 2 08 a-Suu rayon Osh oblast on Page 1 IDA-SRWSSDP-SW-2020-1 Request for Quo Single Stage - On Complete 2020-09-0 2020-11-0 2020-11-2 2021-05- / Rehabilitation SES of Issy IDA / 60880 Sanitation Development Post Open - National 2,408.66 tations e Envelope d 9 4 1 03 k-Kul rayon Issyk-Ku oblast IDA-SRWSSDP-SW-2020-7 Request for Quo Single Stage - On 2020-06-1 2020-08-1 2020-10-1 2021-02- / Rehabilitation SES of Ara IDA / 60880 Sanitation Development Post Open - National 1,898.71 Signed tations e Envelope 7 2 0 08 van rayon Osh oblast IDA-SRWSSDP-SW-2020-8 Request for Quo Single Stage - On Complete 2020-09-0 2020-11-0 2020-11-2 2021-05- / Rehabilitation SES of Ala IDA / 60880 Sanitation Development Post Open - National 1,939.93 tations e Envelope d 9 4 1 03 mudun rayon Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 711,498.4 2021-01-0 2021-01-0 2021-01-0 2021-02-1 2021-02-0 2021-03-1 2021-05-2 2021-04-2 2021-07-0 2022-04- 1-1 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 1 1 7 6 7 9 9 1 3 4 23 r supply system in Kara-Ji gach Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2022-01-1 2022-12-0 2022-01-2 2022-12-0 2022-03-0 2022-12-3 2022-04-0 2023-03-2 2022-05-0 2023-05-2 2023-05- 2-1 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 5 2 0 2 3 0 2 4 7 1 07 r supply system in Kayrm a Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2022-01-1 2022-08-2 2022-01-2 2022-08-2 2022-03-0 2022-09-2 2022-04-0 2022-11-1 2022-05-0 2023-01-1 2023-05- 2-2 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 5 5 0 5 3 3 2 1 7 5 07 r supply system in Vasilev Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-08-2 2021-09-0 2022-08-2 2021-10-1 2022-09-2 2021-11-1 2022-11-1 2021-12-2 2023-01-0 2022-12- 1-2 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 5 6 5 8 3 7 1 2 5 22 er supply system in Komso molskoe Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2023-05-2 2021-09-0 2021-10-1 2023-06-2 2021-11-1 2023-09-0 2021-12-2 2023-10-1 2022-12- 1-3 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 6 6 8 3 7 7 2 2 22 r supply system in Bokso-J ol Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 1,630,213 2021-09-0 2021-11-0 2021-09-0 2021-11-0 2021-10-1 2021-12-0 2021-11-1 2022-01-2 2021-12-2 2022-03-0 2022-12- 1-4 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope .88 1 5 6 5 8 7 7 7 2 3 22 r supply system in Sosnov ka Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 778,341.9 2021-01-0 2021-02-0 2021-01-0 2021-02-0 2021-02-1 2021-03-1 2021-03-1 2021-05-3 2021-04-2 2021-07-1 2022-04- 1-5 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 5 1 4 6 4 7 0 9 1 3 3 23 r supply system in Ivanov ka station Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2022-01-1 2022-12-2 2022-01-2 2022-12-2 2022-03-0 2023-01-2 2022-04-0 2023-03-2 2022-05-0 2023-05-2 2023-05- 2-3 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 5 3 0 6 3 4 2 4 7 1 07 r supply system in Kurpul dok Chui oblast IDA-SRWSSDP-AF-CW-202 Pending I Single Stage - On 2022-01-1 2022-01-2 2022-03-0 2022-04-0 2022-05-0 2023-05- 2-4 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 mplement e Envelope 5 0 3 2 7 07 r supply system in Kum-Ar ation yk Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2022-01-1 2022-12-0 2022-01-2 2022-03-0 2023-01-1 2022-04-0 2023-03-2 2022-05-0 2023-05-1 2023-05- 2-5 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 5 9 0 3 0 2 8 7 6 07 r supply system in Orto-Ar yk Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 397,761.3 2021-09-0 2021-09-2 2021-09-0 2021-09-2 2021-10-1 2021-10-2 2021-11-1 2021-12-0 2021-12-2 2021-12-1 2022-12- 1-6 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 5 1 4 6 4 8 6 7 2 2 5 22 r supply system in Kaindy Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 467,510.5 2021-09-0 2021-05-1 2021-09-0 2021-05-1 2021-10-1 2021-06-0 2021-11-1 2021-07-0 2021-12-2 2021-08-1 2022-12- 1-7 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 3 1 1 6 1 8 9 7 2 2 1 22 r supply system in Borold oi Chui oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-06-0 2021-09-0 2022-06-2 2021-10-1 2022-07-1 2021-11-1 2022-08-1 2021-12-2 2022-10-0 2022-12- 1-8 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 3 6 8 8 3 7 9 2 3 22 r supply system in Buloluu Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-10-2 2021-09-0 2022-10-2 2021-10-1 2022-11-2 2021-11-1 2023-03-0 2021-12-2 2023-04-0 2022-12- 1-9 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 8 6 8 8 9 7 2 2 8 22 r supply system in Toloiko n Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-06-0 2021-09-0 2022-06-0 2021-10-1 2022-07-0 2021-11-1 2022-08-1 2021-12-2 2022-09-2 2022-12- 1-10 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 3 6 3 8 5 7 9 2 6 22 er supply system in Erkin- Too Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-12-2 2021-09-0 2022-12-2 2021-10-1 2023-01-2 2021-11-1 2023-03-0 2021-12-2 2023-04-2 2022-12- 1-11 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 3 6 6 8 4 7 2 2 9 22 er supply system in Kyzyl- Bairak Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-01-2 2021-09-0 2022-01-2 2021-10-1 2022-02-2 2021-11-1 2022-04-1 2021-12-2 2022-05-0 2022-12- 1-12 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 5 6 5 8 2 7 4 2 3 22 er supply system in Kabyk Osh oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-06-1 2021-09-0 2022-06-1 2021-10-1 2022-07-1 2021-11-1 2022-09-0 2021-12-2 2022-10-1 2022-12- 1-13 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 0 6 0 8 2 7 2 2 1 22 er supply system in Enchil esh Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 974,367.2 2021-06-0 2021-06-1 2021-06-0 2021-06-1 2021-07-1 2021-07-1 2021-08-1 2021-08-0 2021-09-2 2021-09-2 2022-09- 1-14 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 5 1 1 6 1 8 3 7 5 1 0 21 er supply system in Jeti-O guz Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 267,037.1 2021-06-0 2021-03-0 2021-06-0 2021-03-0 2021-07-1 2021-04-0 2021-08-1 2021-04-2 2021-09-2 2021-05-2 2022-09- 1-15 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 0 1 2 6 2 8 1 7 0 1 2 21 er supply system in Boz-B eshik Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-04-0 2021-09-0 2022-04-0 2021-10-1 2022-04-2 2021-11-1 2022-07-0 2021-12-2 2022-12- 1-16 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 1 1 6 1 8 9 7 5 2 22 er supply system in Barbu lak Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2023-05-2 2021-09-0 2021-10-1 2023-06-2 2021-11-1 2023-08-1 2021-12-2 2023-10-0 2022-12- 1-17 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 6 6 8 3 7 8 2 3 22 er supply system in Kurm ontu Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2023-07-2 2021-09-0 2021-10-1 2023-08-1 2021-11-1 2023-11-0 2021-12-2 2023-11-1 2022-12- 1-18 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 1 6 8 8 7 3 2 3 22 er supply system in Kichi- Oruktuu Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-09-0 2022-04-2 2021-09-0 2022-04-2 2021-10-1 2022-05-2 2021-11-1 2022-06-2 2021-12-2 2022-08-1 2022-12- 1-19 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 2 6 2 8 0 7 8 2 5 22 er supply system in Jyluu- Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 2021-06-0 2022-11-1 2021-06-0 2022-11-1 2021-07-1 2022-12-1 2021-08-1 2023-03-3 2021-09-2 2023-05-2 2022-09- 1-20 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 Signed e Envelope 1 1 6 1 8 3 7 1 1 1 21 er supply system in Grigor evka Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Pending I Single Stage - On 2021-06-0 2021-06-0 2021-07-1 2021-08-1 2021-09-2 2022-09- 1-21 / Rehabilitation of wat IDA / 60880 Water Supply Investments Post Request for Bids Open - National 0.00 mplement e Envelope 1 6 8 7 1 21 er supply system in Karool ation -Dobo Issyk-Kul oblast IDA-SRWSSDP-AF-CW-202 Single Stage - On 204,124.6 2020-11-2 2020-11-2 2020-12-1 2021-01-2 2020-12-2 2021-02-2 2021-04-1 2021-03-2 2021-05-2 2022-07- 0-27-RT-1 / Rehabilitation IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 8 7 6 1 2 9 1 6 8 3 01 of water supply system in Kyzyl-Jar IDA-SRWSSDP-AF-CW-202 Single Stage - On 373,946.3 2020-11-2 2020-11-2 2020-12-1 2021-01-2 2020-12-2 2021-02-2 2021-04-1 2021-03-2 2021-05-2 2022-07- 0-28-RT-1 / Rehabilitation IDA / 60880 Water Supply Investments Post Request for Bids Open - National Signed e Envelope 6 7 7 1 2 9 1 6 8 9 01 of water supply system in Koo-Chaty IDA-SRWSSDP-AF-CW-202 Single Stage - On 2020-08-1 2020-08-2 2020-08-3 2020-10-1 2020-09-2 2020-11-1 2020-12-1 2022-03- 0-27 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 7 0 1 2 2 1 6 21 er supply system in Kyzyl- Jar IDA-SRWSSDP-AF-CW-202 Single Stage - On 2020-08-1 2020-08-2 2020-08-3 2020-10-1 2020-09-2 2020-11-1 2020-12-1 2022-03- 0-28 / Rehabilitation of wat IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 7 1 1 2 2 1 6 21 er supply system in Koo-C haty National Pr IDA-SRWSSDP-NCB-SW-20 ocurement 22-1 / Rehabiltation of out Document Single Stage - On 2022-08-1 2022-08-1 2022-09-1 2022-10-1 2022-11-1 2023-04- door public conveniences i IDA / D1380 Sanitation Development Post Request for Bids Open - National - 1 Envelop 0.00 Canceled e Envelope 0 7 4 4 8 17 n schools in Chui, Issyk-Kul e process ( and Osh oblasts 1st phase Non Bank- (3 lots) SPD) National Pr IDA-SRWSSDP-AW-2022-1 ocurement / Additional works for reha Single Stage - On Document 2022-08-1 2022-09-0 2022-08-1 2022-09-0 2022-09-3 2023-01-1 2022-10-3 2023-03-3 2022-12-0 2023-05-0 2023-06- IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Signed bilitation of water supply s e Envelope - 1 Envelop 7 2 9 2 0 0 0 1 4 4 02 ystem in Sultan subproject e process ( Non Bank- SPD) National Pr IDA-SRWSSDP-AF-CW-202 ocurement 1-16-2 / Rehabilitation of w Single Stage - On 2022-08-2 2022-09-0 2022-09-0 2022-09-0 2022-10-2 2022-09-3 2022-11-2 2022-11-2 2022-12-2 2023-01-0 2024-03- IDA / 60880 Water Supply Investments Post Request for Bids Open - National Document 0.00 Signed ater supply system in Barb e Envelope 8 2 9 2 1 0 0 1 5 5 24 - 1 Envelop ulak Issyk-Kul oblast e process ( Request Non Bank-for IDA-SRWSSDP-SW-2023-1 SPD) - Smal Bids / Rehabiltation of public co Single Stage - On l Works SP 2023-04-1 2023-04-1 2023-05-0 2023-06-0 2023-06-0 2023-10- IDA / D1380 Sanitation Development Post Request for Bids Open - National 0.00 Canceled nveniences in schools in O e Envelope D (1 envelo 4 8 2 1 3 01 sh oblast 2nd Phase (4 lot pe process s) ) Request for IDA-SRWSSDP-AF-CW-202 Bids - Smal Single Stage - On 2023-05-0 2023-05-1 2023-05-1 2023-06-2 2023-06-1 2023-07-2 2023-08-1 2023-08-2 2023-10-1 2024-08- 3-1 / Rehabilitation of wate IDA / 60880 Water Supply Investments Post Request for Bids Open - National l Works SP 0.00 Signed e Envelope 5 9 0 1 6 1 0 5 2 24 r supply system in Kichi-B D (1 envelo uloluu pe process ) Request for IDA-SRWSSDP-AF-SW-202 Request for Quo Single Stage - On Quotations 2023-06-1 2023-08-0 2023-08-1 2023-11- 3-1 / Rehabiltation of publi IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 4 7 8 05 c conveniences in schools i SPD) n Chuy oblast (2 lots) IDA-SRWSSDP-AF-SW-202 Request for 3-2 / Rehabiltation of publi Request for Quo Single Stage - On Quotations 2023-06-1 2023-08-0 2023-11- IDA / D1380 Sanitation Development Post Open - National 0.00 Canceled c conveniences in schools i tations e Envelope (Non Bank- 4 7 05 n Osh oblast Kara-Suu ray SPD) on Kyzyl-Suu а/а Request for IDA-SRWSSDP-СW-2023-1 Bids - Smal -RT1 / Rehabiltation of pub Single Stage - On l Works SP 2023-06-1 2023-06-2 2023-07-0 2023-08-0 2023-08-0 2023-12- IDA / D1380 Sanitation Development Post Request for Bids Open - National 0.00 Canceled lic conveniences in schools e Envelope D (1 envelo 6 0 4 3 5 03 in Osh oblast 2nd Phase ( pe process 4 lots) ) IDA-SRWSSDP-AF-СW-202 Request for 3-3 / Rehabiltation of publi Request for Quo Single Stage - On Quotations 2023-08-0 2023-09-2 2023-12- IDA / D1380 Sanitation Development Post Open - National 0.00 Canceled c conveniences in schools i tations e Envelope (Non Bank- 4 7 26 n Issyk-Kul oblast (4 lots) SPD) IDA-SRWSSDP-AF-СW-202 Request for 3-5 / Additional works on r Request for Quo Single Stage - On Quotations 2023-07-3 2023-09-1 2023-12-1 2023-12- IDA / 60880 Water Supply Investments Post Open - National 0.00 Signed ehabilitation of water supp tations e Envelope (Non Bank- 0 3 4 12 ly system in Korul village o SPD) f Alai district of Osh oblast IDA-SRWSSDP-AF-СW-202 Request for 3-2-RT1 / Rehabiltation of Request for Quo Single Stage - On Quotations 2023-09-0 2023-10-2 2023-10-2 2024-01- IDA / D1380 Sanitation Development Post Open - National 0.00 Signed public conveniences in sch tations e Envelope (Non Bank- 6 2 0 20 ools in Osh oblast Kara-Su SPD) u rayon Kyzyl-Suu а/а Request for IDA-SRWSSDP-AF-СW-202 Request for Quo Single Stage - On Quotations 2023-10-0 2023-11-2 2023-12-2 2024-03- 3-3-RT1 / Rehabiltation of IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 8 4 7 11 public conveniences in sch SPD) ools in Issyk-Kul oblast IDA-SRWSSDP-CW-2023-1 Request for -RT2-L4 / Construction of a Request for Quo Single Stage - On Quotations 2023-07-1 2023-09-0 2023-08-1 2024-01- IDA / D1380 Sanitation Development Post Open - National 0.00 Signed n outdoor toilet for Borko L tations e Envelope (Non Bank- 6 3 1 01 yceum in Boko village, Noo SPD) kat rayon, Osh oblast. (4 lo t) IDA-SRWSSDP-CW-2023-1 Request for -RT1 / Rehabiltation of pub Request for Quo Single Stage - On Quotations 2023-06-2 2023-08-2 2023-08-1 2023-12- IDA / D1380 Sanitation Development Post Open - National 0.00 Signed lic conveniences in schools tations e Envelope (Non Bank- 8 8 1 30 in Osh oblast 2nd Phase 4 l SPD) ots Request for IDA-SRWSSDP-AF-СW-202 Request for Quo Single Stage - On Quotations 2024-03-1 2024-05-0 2024-09- 4-1 / Rehabilitation of sanit IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 1 4 01 ary facilities in kindergarte SPD) ns Osh oblast (2 lots) IDA-SRWSSDP-AF-СW-202 Request for 4-2 / Rehabilitation of sanit Request for Quo Single Stage - On Quotations 2024-03-1 2024-05-0 2024-09- ary facilities of "Baicheche IDA / D1380 Sanitation Development Post Open - National 0.00 Canceled tations e Envelope (Non Bank- 1 4 01 key" kindergarten located i SPD) n Tamga village, Jeti-Oguz rayon, Issyk-Kul oblast IDA-SRWSSDP-AF-СW-202 Request for 3-4 / Rehabilitation of sanit Request for Quo Single Stage - On Quotations 2024-03-1 2024-04-2 2024-08- IDA / D1380 Sanitation Development Post Open - National 0.00 Signed ary facilities in schools and tations e Envelope (Non Bank- 1 0 18 kindergartens Chui oblast SPD) (4 lots) IDA-SRWSSDP-AF2-СW-RF B-2023-3 / Works for impro Request for Pending I vement of sewerage dispo Request for Quo Single Stage - On Quotations 2024-07-1 2024-10-1 2025-03- IDA / 74700 Sanitation Development Post Open - National 0.00 mplement sal systems for milti-storey tations e Envelope (Non Bank- 5 1 10 ation apartment buldings in sub SPD) projects Kurmontu and Ak- Bulak Issyk-Kul region IDA-SRWSSDP-AF-СW-202 Request for 4-2/RT1 / Rehabilitation of Request for Quo Single Stage - On Quotations 2024-04-0 2024-05-2 2024-11- sanitary facilities of "Baich IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 2 8 24 echekey" kindergarten loc SPD) ated in Tamga village, Jeti- Oguz rayon, Issyk-Kul obla st IDA-SRWSSDP-AF-СW-202 Request for 3-4-L1-RT1 / Rehabilitation Request for Quo Single Stage - On Quotations 2024-04-0 2024-05-2 2024-11- of sanitary facilities of Sos IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 2 8 24 novka school. "Sosnovka" l SPD) ocated in Sosnovka village , Zhayl rayon, Chui oblast Page 2 IDA-SRWSSDP-AF-СW-202 Request for 4-1-L2/R1 / Rehabilitation Request for Quo Single Stage - On Quotations 2024-04-0 2024-05-2 2024-11- of sanitary facilities of the IDA / D1380 Sanitation Development Post Open - National 0.00 Signed tations e Envelope (Non Bank- 2 8 24 Keremet-Balachak kinderg SPD) arten located in Toloykon village, Kara-Suu rayon, Os h oblast IDA-SRWSSDP-CW-2018-1 Single Stage - On 2018-08-2 2018-09-0 2018-10-1 2018-11-1 2018-12-1 2019-06- 3 / Rehabilitation of water IDA / 59070 Water Supply Investments Post Request for Bids Open - National 0.00 Canceled e Envelope 9 3 5 4 9 17 supply system in Gulbar Request for IDA-SRWSSDP-CW-2024-1 Bids - Smal Under Imp Single Stage - On 2024-04-1 2024-05-1 2024-04-1 2024-06-2 2024-07-2 2024-08-2 2026-02- / Rehabilitation of water su IDA / 59070 Water Supply Investments Post Request for Bids Open - National l Works SP 0.00 lementati e Envelope 8 0 8 7 7 6 25 pply system in Gulbar (4 l D (1 envelo on ots) pe process Request ) for IDA-SRWSSDP-AF2-СW-RF Bids - Smal Pending I Single Stage - On 2024-01-1 2024-01-1 2024-02-2 2024-04-2 2024-05-0 2025-11- B-2023-1 / Rehabilitation o IDA / 59070 Water Supply Investments Post Request for Bids Open - National l Works SP 0.00 mplement e Envelope 0 0 1 1 6 05 f water supply system in D (1 envelo ation Otuz Adyr (4 lots) pe process ) GOODS Activity Reference No. Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio Actual Amou Process S Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission / Description Component Review Type Method rt and Recommenda Signed Contract Contract Completion No. ch ocess n (Y/N) nt (US$) tatus n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes tion for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual IDA-SRWSSDP-GOODS-20 Institutional Strengthenin Request for Quo Single Stage - On 2017-01-2 2017-03-2 2017-03-2 2017-09-1 2017-05-2 IDA / D1380 Post Open - National 36,405.43 Completed 17-1 / Purchase of vehicle g tations e Envelope 3 0 3 6 3 for DWWSD IDA-SRWSSDP-GOODS-20 Request for Quo Single Stage - On 2017-02-0 2017-04-0 2017-04-1 2017-10-0 2017-05-1 17-2 / Supply of computer IDA / D1380 Project Management Post Open - National 27,439.86 Completed tations e Envelope 7 4 2 1 2 equipment for ARIS IDA-SRWSSDP-G-2018-11 Institutional Strengthenin Request for Quo Single Stage - On 2018-08-0 2018-09-2 2018-09-1 2019-03-2 2018-11-3 / Supply of computer equip IDA / D1380 Post Open - National 47,378.98 Completed g tations e Envelope 3 8 1 7 0 ment 13 for billing system IDA-SRWSSDP-G-2019-13 Institutional Strengthenin Request for Quo Single Stage - On 2019-07-0 2019-08-2 2019-02-1 2020-02-2 2019-04-0 / Purchase of goods for C IDA / 59070 Post Open - National 23,040.88 Completed g tations e Envelope 4 9 7 5 3 DWUUs for 13 sub-projects IDA-SRWSSDP-G-2019-14 / Purchase of goods for 27 Institutional Strengthenin Request for Quo Single Stage - On 2019-07-0 2019-08-2 2020-02-2 IDA / 59070 Post Open - National 0.00 Canceled CDWUUs on competion ba g tations e Envelope 4 9 5 sis (multiple contracts) IDA-SRWSSDP-G-2019-15 Institutional Strengthenin Single Stage - On 2019-05-0 2019-05-0 2019-06-1 2019-07-1 2019-08-2 2020-02-1 / Purchase of special mach IDA / 59070 Post Request for Bids Open - National 0.00 Canceled g e Envelope 1 6 7 7 1 7 inery for Ayil Okmotu IDA-SRWSSDP-GOODS-20 Institutional Strengthenin Request for Quo Single Stage - On 2018-04-3 2018-06-2 2018-05-0 2018-12-2 2018-06-1 18-6_1 / Purchase of auto IDA / D1380 Post Open - National 1,144.71 Completed g tations e Envelope 0 5 4 2 0 matic telephone system f or DWWSD IDA-SRWSSDP-GOODS-20 Request for Quo Single Stage - On 2018-07-0 2018-07-0 2018-09-0 2018-09-0 2019-03-0 2018-11-2 18-7 / Supply of Computer IDA / 59070 Sanitation Development Post Limited 39,021.28 Completed tations e Envelope 8 6 2 8 1 1 equipment for SES IDA-SRWSSDP-NCB-G-201 Single Stage - On 2018-09-0 2019-02-0 2018-09-1 2018-10-2 2019-02-2 2018-11-2 2019-03-2 2018-12-2 2019-07-1 2019-06-2 2019-08-0 8-9 / Purchase of watermet IDA / D2040 Water Supply Investments Post Request for Bids Open - National 185,827.43 Completed e Envelope 6 1 1 3 8 2 9 7 1 5 5 ers for Sultan, Kurama and Kyrgyz-Ata. IDA-SRWSSDP-NCB-G-201 Single Stage - On 2018-08-3 2019-03-2 2018-09-0 2018-10-1 2019-04-1 2018-11-1 2019-08-2 2018-12-2 2019-12-1 2019-06-2 2020-03-1 8-6 / Supply of laboratory IDA / 59070 Sanitation Development Post Request for Bids Open - National 175,835.38 Completed e Envelope 1 2 7 9 9 8 1 3 2 1 2 equipment for rayon SES IDA-SRWSSDP-G-SIASAR-2 Institutional Strengthenin Request for Quo Single Stage - On 2019-02-1 2019-02-0 2019-04-1 2019-04-2 2019-10-0 2019-05-2 019-1 / Supply of compute TF / A1605 Post Limited 6,742.31 Completed g tations e Envelope 3 1 0 7 7 5 r equipment for SIASAR te am IDA-SRWSSDP-G-2018-10 / Purchase of watermeters Institutional Strengthenin Request for Quo Single Stage - On 2018-07-2 2018-09-1 2019-03-1 IDA / 59070 Post Open - National 0.00 Canceled Sary-Tash, Achyk-Suu, Kun g tations e Envelope 0 4 3 -tuu, Alekseevka, Kyzyl-Tu u, Tolok IDA-SRWSSDP-GOODS-20 18-10 / Purchase of water Institutional Strengthenin Single Stage - On 2019-05-0 2019-05-1 2019-05-0 2019-06-1 2019-06-2 2019-07-1 2019-06-2 2019-08-2 2019-08-1 2020-02-1 2020-01-0 IDA / D1380 Post Request for Bids Open - National 154,007.32 Completed meters Kun-tuu, Alekseevk g e Envelope 1 6 8 9 8 9 8 3 9 9 1 a, Kyzyl-Tuu, Tolok, Korul a nd Ichke-Bulun IDA-SRWSSDP-GOODS-20 Request for Quo Single Stage - On 2018-05-1 2018-05-0 2018-07-1 2018-07-0 2018-09-0 2018-08-1 IDA / 59070 Project Management Post Limited 20,499.19 Completed 18-6 / Supply of technical tations e Envelope 5 8 0 1 8 3 equipment IDA-SRWSSDP-GOODS-20 Institutional Strengthenin Request for Quo Single Stage - On 2017-11-0 2017-11-0 2018-01-0 2018-01-2 2018-06-3 2018-05-2 IDA / D1380 Post Limited 10,971.16 Completed 17-5 / Purchase of waterm g tations e Envelope 6 8 1 6 0 9 eters for Togotoi IDA-SRWSSDP-GOODS-20 Request for Quo Single Stage - On 2017-04-1 2017-04-2 2017-06-1 2017-06-1 2017-12-0 2017-09-0 IDA / 59070 Project Management Post Limited 22,012.83 Completed 17-3 / Supply of 2 piece au tations e Envelope 7 4 2 1 9 3 to for ARIS IDA-SRWSSDP-GOODS-RF Q-20-1 / Purchase of chlori Request for Quo Single Stage - On 2020-04-1 2020-04-1 2020-05-2 2020-05-1 2020-06-2 2020-05-2 IDA / 59070 Sanitation Development Post Limited 25,503.94 Completed ne for disinfection of publi tations e Envelope 3 5 1 4 0 0 c/social institutions and pu blic places IDA-SRWSSDP-G-2020-1 / Institutional Strengthenin Request for Quo Single Stage - On 2020-06-0 2020-08-0 2020-08-0 2020-08-3 2020-08-2 Supply of computer equip IDA / D1380 Post Open - National 9,637.33 Completed g tations e Envelope 6 1 5 1 7 ment 12 for billing system IDA-SRWSSDP-G-2020-3 / Purchase of watermeters f Institutional Strengthenin Request for Quo Single Stage - On 2020-06-2 2020-08-1 2020-11-0 2020-11-1 2020-12-2 IDA / D1380 Post Open - National 33,272.37 Completed or Darkan and Chelpek su g tations e Envelope 3 8 1 6 7 bprojects Issyk-Kul oblast IDA-SRWSSDP-G-2020-4 / Institutional Strengthenin Request for Quo Single Stage - On 2020-06-2 2020-08-1 2020-11-1 Purchase of goods for CD IDA / 59070 Post Open - National 0.00 Canceled g tations e Envelope 3 8 6 WUUs of WSS sub-projects IDA-SRWSSDP-G-2021-2 / Request for Quo Single Stage - On 2021-07-0 2021-09-0 2021-05-0 2022-02-2 2021-05-3 Supply of computer equip IDA / 60880 Sanitation Development Post Open - National 16,201.71 Completed tations e Envelope 7 1 1 8 0 ment for 14 rayons SES IDA-SRWSSDP-G-2021-3 / Institutional Strengthenin Request for Quo Single Stage - On 2021-07-0 2021-09-0 2021-05-1 2022-02-2 2021-05-3 Supply of computer equip IDA / 60880 Post Open - National 13,531.05 Completed g tations e Envelope 7 1 1 8 0 ment 30 for billing system IDA-SRWSSDP-G-2021-4 / Pending Im Institutional Strengthenin Single Stage - On 2022-01-1 2022-01-1 2022-02-2 2022-03-2 2022-05-0 2022-10-2 Purchase of goods for CD IDA / 60880 Post Request for Bids Open - National 0.00 plementati g e Envelope 0 5 6 8 2 9 WUUs for 42 sub-projects ( on multiple contracts) IDA-SRWSSDP-G-2022-1 / Institutional Strengthenin Single Stage - On 2022-09-0 2022-09-0 2022-10-1 2022-11-1 2022-12-2 2023-06-2 Purchase of special machi IDA / 60880 Post Request for Bids Open - National 0.00 Canceled g e Envelope 1 6 8 7 2 0 nery for Ayil Okmotu IDA-SRWSSDP-G-2022-2 / Institutional Strengthenin Request for Quo Single Stage - On 2022-09-0 2022-11-0 2023-04-3 IDA / 60880 Post Open - National 0.00 Canceled Purchase of goods for DW g tations e Envelope 6 1 0 WSD IDA-SRWSSDP-G-2022-3 / Institutional Strengthenin Single Stage - On 2022-09-0 2022-09-0 2022-10-1 2022-11-1 2022-12-2 2023-06-2 IDA / 60880 Post Request for Bids Open - National 0.00 Canceled Goods for Training Center g e Envelope 1 6 8 7 2 0 IDA-SRWSSDP-G-2021-5 / Request for Quo Single Stage - On Pending Im 2021-09-0 2021-11-0 2022-05-0 IDA / 60880 Project Management Post Open - National 0.00 Technical-engineering equi tations e Envelope plementati 7 2 1 pment for ARIS on IDA-SRWSSDP-G-2021-6 / Pending Im Request for Quo Single Stage - On 2021-09-0 2021-11-0 2022-05-0 Supply of computer and o IDA / 60880 Project Management Post Open - National 0.00 plementati tations e Envelope 7 2 1 ffice equipment for ARIS on IDA-SRWSSDP-G-2020-2 / Supply of computer equip Request for Quo Single Stage - On 2020-07-0 2020-06-1 2020-08-2 2020-09-2 ment for Republican cent IDA / D1380 Sanitation Development Post Open - National 0.00 Canceled tations e Envelope 1 9 6 5 er for health promotion an d mass communication un der GOKR IDA-SRWSSDP-G-2020-4-R Institutional Strengthenin Request for Quo Single Stage - On 2021-02-1 2021-03-0 2021-04-0 2021-07-0 T-1 / Purchase of goods for IDA / 59070 Post Open - National 0.00 Canceled g tations e Envelope 0 1 7 6 CDWUUs of WSS sub-proje cts IDA-SRWSSDP-G-2021-1 / Single Stage - On 2021-02-0 2021-02-1 2021-03-2 2021-04-2 2021-05-2 2021-11-2 Supply of laboratory equip IDA / 59070 Sanitation Development Post Request for Bids Open - National 0.00 Canceled e Envelope 5 0 4 3 8 4 ment for 11 rayons 2 Lots IDA-SRWSSDP-G-2020-2-R T-1 / Supply of computer e Request for Quo Single Stage - On 2020-07-0 2020-08-3 2020-12-0 2021-02-2 2020-12-2 quipment for Republican c IDA / 60880 Sanitation Development Post Open - National 2,350.90 Completed tations e Envelope 6 1 8 7 2 enter for health promotion and mass communication under GOKR IDA-SRWSSDP-G-2019-16 Institutional Strengthenin Single Stage - On 2023-08-0 2023-08-0 2023-09-1 2023-10-1 2023-11-2 2024-05-1 / Purchase of watermeters IDA / 59070 Post Request for Bids Open - National 0.00 Canceled g e Envelope 1 6 7 7 1 9 for Otuz Adyr, Gulbar IDA-SRWSSDP-G-2020-4-R Institutional Strengthenin Request for Quo Single Stage - On 2021-08-2 2021-10-2 2021-09-2 2022-01-2 2021-10-2 T-2 / Purchase of goods fo IDA / 59070 Post Open - National 70,319.55 Completed g tations e Envelope 0 9 4 7 0 r CDWUUs of WSS sub-proj ects IDA-SRWSSDP-G-2021-7 / Institutional Strengthenin Request for Quo Single Stage - On 2021-09-2 2021-11-2 2021-12-1 2022-02-2 2022-01-0 Purchase of goods for 19 C IDA / 59070 Post Open - National 65,782.63 Completed g tations e Envelope 0 9 0 7 6 DWUUs of WSS sub-project s IDA-SRWSSDP-RFQ-GOOD Institutional Strengthenin Request for Quo Single Stage - On 2022-03-0 2022-05-0 2023-03-2 2022-07-0 2023-04-0 S-2022-1 / Purchase of spe IDA / 60880 Post Open - National 0.00 Completed g tations e Envelope 9 5 9 4 2 cial machinery for Sultan s ubproject IDA-SRWSSDP-AF-G-2022- Institutional Strengthenin Request for Quo Single Stage - On 2022-02-2 2022-03-3 2022-04-2 2022-04-1 2022-05-2 4 / Purchase of furniture fo IDA / D2040 Post Open - National 0.00 Completed g tations e Envelope 3 0 3 3 1 r DWWSD conference-roo m IDA-SRWSSDP-AF-G-2021- Institutional Strengthenin Request for Quo Single Stage - On 2021-09-2 2021-12-3 2022-01-1 2022-03-0 1 / Purchase of conference IDA / D2040 Post Open - National 20,558.94 Signed g tations e Envelope 4 1 7 1 equipment for DWWSD IDA-SRWSSDP-G-2021-1-R Single Stage - On 2022-03-1 2022-03-1 2022-03-1 2022-03-1 2022-04-1 2022-04-1 2022-05-1 2022-06-2 2022-12-1 T-2 / Supply of laboratory IDA / 59070 Sanitation Development Post Request for Bids Open - National 0.00 Canceled e Envelope 0 1 8 1 7 2 7 1 8 equipment for 11 rayons IDA-SRWSSDP-G-2021-1-R Single Stage - On 2021-08-0 2021-08-0 2021-08-1 2021-09-1 2021-09-1 2021-10-1 2021-11-1 2022-05-1 T-1 / Supply of laboratory IDA / 59070 Sanitation Development Post Request for Bids Open - National 0.00 Canceled e Envelope 6 2 3 0 4 0 4 3 equipment for 11 rayons IDA-SRWSSDP-RFQ-GOOD Institutional Strengthenin Request for Quo Single Stage - On 2022-04-1 2022-06-1 2022-07-1 2022-08-1 2022-08-1 S-2022-1-RT-1 / Purchase IDA / 60880 Post Open - National 0.00 Completed g tations e Envelope 6 2 5 1 6 of special machinery for S ultan subproject IDA-SRWSSDP-G-2022-4 / Supply of computer equip Institutional Strengthenin Request for Quo Single Stage - On 2022-08-2 2022-10-1 2022-09-1 2022-11-2 2022-10-1 IDA / 60880 Post Open - National 9,814.29 Signed ment for 14 municipal wat g tations e Envelope 0 5 7 9 5 er unit (MWU) system in C hui, Issyk Kul and Osh obla sts. IDA-SRWSSDP-G-2021-1-R Single Stage - On 2023-03-2 2023-04-0 2023-03-2 2023-05-1 2023-05-1 2023-06-0 2023-07-1 2023-07-1 2023-08-0 2024-01-1 2023-11-1 T-3 / Supply of laboratory IDA / 59070 Sanitation Development Post Request for Bids Open - National 0.00 Completed e Envelope 4 6 9 0 2 9 1 4 9 0 3 equipment for 11 rayons IDA-SRWSSDP-G-2023-1 / Institutional Strengthenin Request for Quo Single Stage - On 2023-05-3 2023-07-2 2023-06-2 2023-08-2 2023-07-1 IDA / D1380 Post Open - National 0.00 Completed Computer equipment for g tations e Envelope 0 5 7 4 8 WMU IDA-SRWSSDP-G-2023-3 / Institutional Strengthenin Request for Quo Single Stage - On 2023-06-1 2023-08-1 2023-08-1 2023-11-0 Purchase of goods for CD IDA / 59070 Post Open - National 0.00 Completed g tations e Envelope 4 0 6 8 WUUs for 15 sub-projects IDA-SRWSSDP-G-2023-4 / Procurement of a wheeled Institutional Strengthenin Request for Quo Single Stage - On 2023-10-1 2023-12-0 2024-02-0 IDA / 60880 Post Open - National 0.00 Canceled excavator for the Achyk-Su g tations e Envelope 5 3 1 u and Kabyk sub-projects IDA-SRWSSDP-G-2023-4/R T1 / Procurement of a whe Institutional Strengthenin Request for Quo Single Stage - On 2023-12-0 2024-01-2 2024-02-2 2024-03-2 IDA / 60880 Post Open - National 0.00 Signed eled excavator for the Ach g tations e Envelope 2 1 7 1 yk-Suu and Kabyk sub-proj ects IDA-SRWSSDP-AF2-G-RFB- Pending Im Institutional Strengthenin Single Stage - On 2024-01-1 2024-01-1 2024-04-0 2024-06-0 2024-06-1 2024-08-1 2023-1 / Procurement of s IDA / 74700 Post Request for Bids Open - National 0.00 plementati g e Envelope 0 1 3 2 7 6 pecial equipment for MPVs on IDA-SRWSSDP-AF-RFB-G-2 Pending Im Institutional Strengthenin Single Stage - On 2024-06-1 2024-06-1 2024-07-1 2024-08-1 2024-09-2 2024-11-2 024-2 / Procurement of lab IDA / 60880 Post Request for Bids Open - National 0.00 plementati g e Envelope 3 4 2 1 3 2 equipment for Kyrgyz Stat on e Technical University IDA-SRWSSDP-AF-RFQ-G-2 Pending Im Institutional Strengthenin Request for Quo Single Stage - On 2024-06-1 2024-08-0 2024-09-2 024-1 / Procurement of offi IDA / D1380 Post Open - National 0.00 plementati g tations e Envelope 4 7 1 ce equipment for Kyrgyz S on tate Technical University NON CONSULTING SERVICES Activity Reference No. Bid Evaluation Repo Loan / Credit Market Approa Procurement Pr Prequalificatio Actual Amou Process S Draft Pre-qualificatio Prequalification Eval Draft Bidding Docu Specific Procuremen Bidding Documents Proposal Submission / Description Component Review Type Method rt and Recommenda Signed Contract Contract Completion No. ch ocess n (Y/N) nt (US$) tatus n Documents uation Report ment / Justification t Notice / Invitation as Issued / Opening / Minutes tion for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 3 CONSULTING FIRMS Activity Reference No. Short List and Draft Combined Evaluatio Loan / Credit Market Approa Contract Type Actual Amoun Process Statu Expression of Intere Request for Proposa Opening of Technica Evaluation of Techn / Description Component Review Type Method Terms of Reference Request for Proposa n Report and Draft Signed Contract Contract Completion No. ch t (US$) s st Notice ls as Issued l Proposals / Minutes ical Proposal ls Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual RWSSP3-PPG-CQ-2016-1 / Consultant Qual Consultants for Detailed D Open - Internatio 2016-04-1 2016-04-2 TF / A1605 Water Supply Investments Prior ification Selecti 125,290.67 Signed esign of Village Water Sup nal 5 4 on ply Infrastructure in Chui a nd Osh Oblasts SRWSSDP-QCBS-2016-2 / Quality And Cos Open - Internatio 2016-12-0 2016-12-0 2016-12-2 2017-02-1 2017-03-2 2017-03-1 2017-05-0 2017-04-1 2017-05-1 2017-05-1 2017-05-2 2017-06-1 2017-06-0 2018-06-1 2018-04-1 Preparation of detailed des IDA / 59070 Water Supply Investments Post t-Based Selectio 161,171.72 Completed nal 8 5 9 1 8 1 3 0 2 5 5 9 4 9 5 igns for WSS sub-projects i n n Chui oblast SRWSSDP-CQ-2017-3 / Ba Consultant Qual 2017-01-0 2017-02-2 2017-01-2 2017-03-0 2017-04-2 2017-04-0 2017-05-3 2017-05-1 2017-06-0 2017-11-0 2017-12-2 IDA / D1380 Project Management Post Open - National 34,049.99 Completed seline Survey ification Selecti 3 1 4 9 0 8 1 3 5 9 7 on SRWSSDP-QCBS-2016-1 / Quality And Cos Open - Internatio 2016-12-0 2016-12-2 2017-02-1 2017-03-1 2017-04-1 2017-05-1 2017-06-1 2018-06-1 Preparation of detailed des IDA / 59070 Water Supply Investments Post t-Based Selectio 0.00 Canceled nal 8 9 1 1 0 5 9 9 igns for WSS sub-projects i n n Osh oblast SRWSSDP-CQ-2017-4 / Pr Consultant Qual 2017-08-1 2017-08-2 2017-09-0 2017-08-2 2017-10-2 2017-10-1 2017-11-1 2017-12-0 2017-12-2 2017-12-2 2018-06-2 2019-09-1 eparation of detailed desig IDA / D1380 Water Supply Investments Post ification Selecti Open - National 184,576.00 Completed 6 2 6 2 0 7 9 1 4 2 2 4 ns for WSS sub-projects in on Osh oblast ARIS-AUDIT-LCS-2017-1 / Least Cost Selec Open - Internatio 2017-10-1 2017-10-0 2017-11-0 2018-03-1 2017-12-2 2018-03-2 2018-01-1 2018-04-1 2018-02-1 2018-04-1 2018-03-2 2018-04-2 2018-04-2 2018-05-0 2018-10-2 2022-06-3 IDA / D1380 Project Management Post 53,521.44 Signed Audit of project funds tion nal 7 9 7 2 1 8 8 8 7 8 4 3 8 3 5 0 IDA-SRWSSDP-CQ-2017-8 Consultant Qual / Preparation of designs an 2018-01-1 2017-11-0 2018-01-3 2018-03-1 2018-01-0 2018-04-1 2018-04-2 2018-05-2 2018-05-1 2018-11-1 2021-01-1 IDA / 59070 Sanitation Development Post ification Selecti Open - National 26,005.01 Completed d author supervision of su 0 3 1 6 8 5 4 0 2 6 8 on b-projects for out side toile ts IDA-SRWSSDP-CQ-2017-6 Consultant Qual / Creative Agency 2017-10-0 2017-09-2 2017-10-2 2017-12-0 2017-11-1 2018-01-0 2017-12-1 2018-02-0 2018-01-0 2018-08-0 2019-06-1 IDA / 59070 Sanitation Development Post ification Selecti Open - National 139,285.00 Completed Development of a Sector- 2 5 3 6 3 5 5 9 6 8 5 on Wide WASH communicatio n campaign IDA-SRWSSDP-CQ-2018-9 / Consultant for design and Consultant Qual Institutional Strengthenin 2018-01-3 2018-02-2 2018-04-0 2018-05-0 2018-06-0 2018-12-0 development of Managem IDA / 59070 Post ification Selecti Open - National 0.00 Canceled g 0 0 5 5 9 6 ent Information System for on improvement of sector per formance monitoring syste m IDA-SRWSSDP-CQ-AF-201 Consultant Qual 2018-10-0 2019-02-2 2018-10-2 2019-03-2 2018-12-0 2019-05-2 2019-01-0 2019-07-0 2019-02-1 2019-08-1 IDA / D1380 Project Management Post Open - National 0.00 Canceled 8-1 / Baseline Survey ification Selecti 5 7 6 3 9 2 8 1 2 1 on IDA-AF-SRWSSDP-QCBS-2 019-1 / Selection of Consul Quality And Cos Open - Internatio 2019-02-1 2019-02-1 2019-03-0 2019-02-1 2019-04-1 2019-05-2 2019-05-1 2019-06-2 2019-06-1 2019-07-0 2019-07-1 2019-07-2 2019-08-2 2019-08-1 2020-08-2 2021-01-1 tant for Detailed Design of IDA / D2040 Water Supply Investments Post t-Based Selectio 150,612.74 Completed nal 1 3 4 3 7 4 5 5 4 4 9 6 3 9 2 6 Village Water Supply Infras n tructure in Chui Oblast (6 s ub-projects)-1 package IDA-AF-SRWSSDP-QCBS-2 018-1 / Selection of Consul Quality And Cos tant for Detailed Design of Open - Internatio 2018-06-0 2018-07-0 2018-06-2 2018-08-1 2018-09-0 2018-10-0 2018-11-1 2018-12-1 2019-12-1 IDA / D2040 Water Supply Investments Post t-Based Selectio 0.00 Canceled Village Water Supply Infras nal 7 5 8 1 8 8 2 7 7 n tructure in Osh, Chui and I ssyk-Kul Oblasts (10 subpr ojects) -1 package IDA-AF-SRWSSDP-QCBS-2 018-2 / Selection of Consul Quality And Cos tant for Detailed Design of Open - Internatio 2018-06-1 2018-07-0 2018-07-0 2018-08-1 2018-09-1 2018-10-1 2018-11-1 2018-12-2 2019-12-2 IDA / D2040 Water Supply Investments Post t-Based Selectio 0.00 Canceled Village Water Supply Infras nal 0 5 1 4 1 1 5 0 0 n tructure in Osh, Chui and I ssyk-Kul Oblasts (10 sub-p rojects)-2 package IDA-SRWSSDP-CQ-2017-5 Consultant Qual / Revisions to Interpersona 2017-10-0 2017-10-2 2017-12-0 2018-01-0 2018-02-0 2018-08-0 IDA / 59070 Sanitation Development Post ification Selecti Open - National 0.00 Canceled l Communication Package 2 3 6 5 9 8 on and School WASH material s IDA-SRWSSDP-CQS-2017- Consultant Qual 5 / Revisions to Interperso 2017-02-1 2017-09-2 2017-03-0 2017-04-1 2017-11-1 2017-05-1 2017-12-1 2017-06-2 2018-01-0 2017-12-1 2019-08-1 IDA / 59070 Sanitation Development Post ification Selecti Open - National 53,299.24 Completed nal Communication Packa 0 5 3 6 3 6 8 0 2 7 2 on ge and School WASH mate rials IDA-SRWSSDP-QCBS-2019 -1 / Consulting Firm to assi st in review of Design and Quality And Cos Open - Internatio 2019-07-2 2019-08-0 2019-08-2 2019-08-2 2019-10-0 2020-03-0 2019-11-0 2020-05-2 2019-12-0 2021-10-2 2020-01-0 2020-02-1 2021-12-3 Estimate Documents and T IDA / D1380 Water Supply Investments Prior t-Based Selectio 0.00 Canceled nal 5 2 2 6 3 4 7 7 5 4 2 0 1 echnical Supervision of civi n l works for water supply sy stems rehabilitation in sub projects of Chui, Osh and I ssyk-Kul Oblasts IDA-SRWSSDP-AF-QCBS-2 019-2 / Consultant for Prep Quality And Cos aration of Feasibility Study Open - Internatio 2019-03-0 2019-03-1 2019-03-2 2019-04-0 2019-05-1 2019-06-0 2019-07-0 2019-08-1 2019-09-1 2020-09-1 IDA / 59070 Water Supply Investments Prior t-Based Selectio 0.00 Canceled and Preliminary Designs fo nal 8 4 9 5 2 9 9 3 7 6 n r Water Supply Systems in 31 Sub-projects in Chui, Os h and Issyk-Kul Oblasts IDA-SRWSSDP-CQ-2017-7 / Consultant for updating a Consultant Qual Institutional Strengthenin 2017-11-3 2017-10-1 2017-12-2 2018-02-0 2017-12-1 2018-03-0 2018-01-2 2018-04-0 2018-02-2 2018-10-0 2019-04-1 nd extending of training m IDA / 59070 Post ification Selecti Open - National 34,009.44 Completed g 0 7 1 3 3 5 9 9 6 6 2 odules for training of Aiyl on Okmotu/CDWUU and other operators IDA-SRWSSDP-QCBS-FS-2 020-1 / Preparation of Feas Quality And Cos ibility Study and Preliminar Open - Internatio 2020-03-2 2020-03-2 2020-04-1 2020-04-1 2020-05-1 2020-06-1 2020-06-1 2020-09-1 2020-07-1 2020-10-3 2020-08-1 2020-11-1 2020-09-1 2021-03-3 2022-05-0 IDA / 59070 Water Supply Investments Post t-Based Selectio 0.00 Completed y Designs for Water Suppl nal 0 0 0 3 5 2 4 8 4 0 1 3 5 0 2 n y Systems in the regions o f Otuz-Adyr and Gulbaar vi llages, Osh oblast IDA-AF-SRWSSDP-QCBS-2 019-2 / Selection of Consul Quality And Cos Open - Internatio 2019-09-0 2019-10-2 2019-09-2 2019-11-0 2019-12-1 2019-12-0 2020-01-1 2020-01-0 2020-01-1 2020-02-0 2020-01-2 2020-03-1 2020-02-1 2021-03-1 tant for Detailed Design of IDA / 59070 Water Supply Investments Post t-Based Selectio 118,506.99 Signed nal 2 4 3 6 9 4 0 3 7 7 9 3 5 3 Village Water Supply Infras n tructure in Chui Oblast-2 p ackage IDA-SRWSSDP-CQS-COMP 2-2020-1 / Company on pr Consultant Qual oducing of social informati 2020-06-0 2020-06-1 2020-06-2 2020-08-1 2020-09-1 2020-10-1 2021-04-1 IDA / D1380 Sanitation Development Post ification Selecti Open - National 0.00 Canceled onal and educational video 8 5 9 2 1 6 4 on clips on prevention the spr ead of COVID-19 virus in t he Kyrgyz Republic IDA-SRWSSDP-CQS-COMP 2-2020-2 / Company on pr oducing a video training o Consultant Qual 2020-06-0 2020-06-1 2020-06-2 2020-08-1 2020-09-1 2020-10-1 2021-04-1 n preventing the spread of IDA / D1380 Sanitation Development Post ification Selecti Open - National 0.00 Canceled 8 5 9 2 1 6 4 COVID-19 virus for a wide on range of people working wi th the population after qua rantine (for field activists) IDA-SRWSSDP-CQS-COMP Consultant Qual 3-2020-2 / Сompany for su Institutional Strengthenin 2020-06-1 2020-08-0 2020-07-0 2020-08-2 2021-03-1 2020-09-2 2021-05-3 2020-10-2 2021-06-0 2021-05-2 IDA / D1380 Post ification Selecti Open - National 73,634.03 Signed pporting to Institutional De g 8 5 9 2 1 1 1 6 5 4 on velopment Plan for the DD WSWD IDA-SRWSSDP-CQS-COMP 3-2020-3 / Company for th Consultant Qual e Supporting to Water Sup Institutional Strengthenin 2020-06-1 2020-09-0 2020-07-0 2020-08-2 2020-12-0 2020-09-2 2021-06-1 2020-10-2 2021-06-2 2021-07-2 IDA / D1380 Post ification Selecti Open - National 190,872.51 Signed ply and Sanitation Sector P g 8 3 9 2 4 1 8 6 9 3 on rofessional and Vocational Development Program in t he Kyrgyz Republic IDA-SRWSSDP-CQS-COMP 3-2020-1 / Company for th Consultant Qual Institutional Strengthenin 2020-06-1 2020-09-0 2020-07-0 2020-08-2 2020-12-0 2020-09-2 2021-01-1 2020-10-2 2021-02-1 2021-04-2 e development of Legal R IDA / D1380 Post ification Selecti Open - National 35,780.01 Signed g 8 3 9 2 4 1 8 6 7 4 egulatory Acts for Water S on upply and Wastewater Dis posal Sector IDA-SRWSSDP-CQS-COMP 2-2020-3 / Company for Pr Consultant Qual 2020-07-1 2020-07-2 2020-07-3 2020-09-1 2020-09-1 2020-10-1 2020-09-1 2020-11-1 2020-10-1 2021-11-1 2020-12-0 oduction Social and Educat IDA / D1380 Sanitation Development Post ification Selecti Open - National 15,326.40 Completed 0 0 1 3 4 3 8 7 3 7 1 ional Videos on prevention on of COVID-19 spread in the Kyrgyz Republic IDA-SRWSSDP-AF-CQS-20 Consultant Qual 19-4 / Preparation of detail Pending Imple 2019-09-2 2019-10-1 2019-11-2 2019-12-2 2020-02-0 2021-02-0 IDA / 60880 Water Supply Investments Post ification Selecti Open - National 0.00 ed designs for WSS sub-pr mentation 5 6 9 9 2 1 on ojects in Osh oblast (1 pha se) IDA-SRWSSDP-AF-QCBS-D Quality And Cos DE-2020-1 / Preparation of Under Impleme 2020-06-3 2020-01-1 2020-07-2 2020-09-0 2020-10-0 2020-10-3 2020-12-0 2021-01-0 2022-01-0 IDA / 60880 Water Supply Investments Post t-Based Selectio Open - National 0.00 detailed designs for WSS s ntation 0 5 1 3 1 1 5 9 9 n ub-projects in Osh oblast ( 2 Phase) IDA-AF-SRWSSDP-QCBS-2 Quality And Cos 020-3 / Preparation of deta 2020-03-0 2020-03-2 2020-05-0 2020-06-0 2020-07-0 2020-08-0 2020-09-1 2021-09-1 IDA / 60880 Water Supply Investments Post t-Based Selectio Open - National 0.00 Canceled iled designs for WSS sub-p 1 2 5 2 2 6 0 0 n rojects in Chui oblast (3 Ph ase) IDA-SRWSSDP-AF-CQS-20 Consultant Qual 19-3 / Preparation of detail Pending Imple 2019-10-0 2019-10-2 2019-12-0 2020-01-0 2020-02-1 2020-08-0 IDA / 60880 Water Supply Investments Post ification Selecti Open - National 0.00 ed designs for WSS sub-pr mentation 3 4 7 6 0 8 on ojects in IK oblast (1 Phase ) IDA-SRWSSDP-AF-QCBS-D Quality And Cos DE-2020-2 / Preparation of 2020-03-0 2020-03-1 2020-03-2 2020-05-0 2020-07-3 2020-06-0 2020-09-0 2020-07-0 2020-10-3 2020-08-0 2020-11-1 2020-09-1 2020-12-1 2021-09-1 2022-07-2 IDA / 60880 Water Supply Investments Post t-Based Selectio Open - National 127,488.68 Completed detailed designs for WSS s 1 6 2 5 0 2 2 2 0 6 7 0 3 0 9 n ub-projects in IK oblast (2 Phase) IDA-SRWSSDP-AF-CQS-19- Consultant Qual 2019-02-2 2019-02-2 2019-03-2 2019-05-0 2019-05-2 2019-06-0 2019-07-0 2019-07-0 2019-07-0 2020-01-0 2020-02-0 1 / Baseline Survey and Im IDA / 60880 Project Management Post ification Selecti Open - National 35,671.67 Completed 7 7 0 3 2 2 1 7 5 3 5 pact Assesment on IDA-SRWSSDP-AF-CQS-20 Consultant Qual 21-1 / Technical Supervisio 2021-04-2 2021-06-0 2021-05-2 2021-06-1 2021-07-0 2022-05-1 2021-07-2 2022-08-1 2021-08-0 2022-09-0 2023-08-0 IDA / D1380 Water Supply Investments Post ification Selecti Open - National 98,658.58 Signed n of Civil Works for Constr 6 4 4 1 5 6 6 9 9 4 9 on uction of Rural Water Supp ly and Sanitation Systems ARIS-AUDIT-LCS-2021-1 / Least Cost Selec Open - Internatio Under Impleme 2021-08-0 2021-08-1 2021-08-2 2021-09-2 2021-09-1 2021-10-0 2021-10-1 2021-11-0 2021-11-2 2023-12-3 IDA / 60880 Project Management Post 0.00 Audit tion nal ntation 6 6 0 4 7 8 5 5 6 1 IDA-SRWSSDP-AF-CQS-EIA -2021 / Consulting compan Consultant Qual y for Engineering, Environ 2021-05-0 2021-05-0 2021-05-2 2021-06-1 2021-06-2 2021-10-0 2021-07-0 2021-07-1 2021-09-2 IDA / D2040 Water Supply Investments Post ification Selecti Open - National 0.00 Canceled mental and Sanitary Safet 7 7 8 1 5 8 2 6 4 on y Review in subprojects Iv anovka Station, Kara-Jygac h, Sosnovka, Komsomol’sk oe and Kurmontu IDA-SRWSSDP-CQS-2022- Consultant Qual 2022-08-1 2022-08-1 2022-09-0 2022-10-1 2022-10-0 2022-11-1 2022-11-1 2022-12-2 2022-11-3 2023-06-2 1 / Preparation of detailed IDA / D1380 Water Supply Investments Post ification Selecti Open - National 0.00 Signed 5 1 5 9 4 8 5 3 0 1 designs for Otuz-Adyr WSS on sub-project IDA-SRWSSDP-CQS-2022- Consultant Qual 2022-08-1 2022-08-1 2022-09-0 2022-10-1 2022-10-0 2022-11-1 2022-11-1 2022-12-2 2022-11-3 2023-06-2 2 / Preparation of detailed IDA / D1380 Water Supply Investments Post ification Selecti Open - National 0.00 Signed 5 1 5 9 4 8 5 3 0 1 designs for Gulbar WSS su on b-project IDA-SRWSSDP-AF-CQS-20 22-11 / Development of So Consultant Qual cial Video Tutorials on Rul Under Impleme 2023-01-1 2023-03-1 2023-01-3 2023-03-1 2023-04-1 2023-05-2 2023-06-1 IDA / D2040 Sanitation Development Post ification Selecti Open - National 0.00 es for Construction of Outd ntation 0 3 1 6 5 0 9 on oor Latrines With Improve d Ventilation and Septic Ta nks at Rural Households IDA-SRWSSDP-AF2-CS-CQ S-2023-1 / Preparation of d Consultant Qual etailed desings for improv Under Impleme 2024-01-0 2024-04-1 2024-01-1 2024-03-0 2024-03-0 2024-04-0 2024-07-0 IDA / 74700 Sanitation Development Post ification Selecti Open - National 0.00 ement of sewerage dispos ntation 3 6 7 1 6 4 3 on al systems for milti-storey apartment buldings in sub projects Kurmontu and Ak- Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-CQS-20 Consultant Qual 24-1 / Consulting services Pending Imple 2024-06-1 2024-06-1 2024-07-1 2024-07-3 2024-08-1 2026-05-0 IDA / D1380 Water Supply Investments Post ification Selecti Open - National 0.00 for technical supervision of mentation 3 8 7 1 5 5 on water supply rehabilitation in Otuz-Adyr IDA-SRWSSDP-AF-CQS-20 Consultant Qual 24-2 / Consulting services Pending Imple 2024-06-1 2024-06-1 2024-07-1 2024-07-3 2024-08-1 2026-02-2 IDA / D1380 Water Supply Investments Post ification Selecti Open - National 0.00 for technical supervision of mentation 3 8 7 1 5 0 on water supply rehabilitation in Gulbaar INDIVIDUAL CONSULTANTS Activity Reference No. Loan / Credit Market Approa Actual Amoun Process Statu Invitation to Identifi Draft Negotiated Co Component Review Type Method Contract Type Teams of Reference Signed Contract Contract Completion / Description No. ch t (US$) s ed/Selected Consult ntract Planned Actual Planned ant Actual Planned Actual Planned Actual Planned Actual RWSSP3-PPG-IC-2016-1 / Selection of Consultant for Individual Cons 2016-09-1 2016-09-2 TF / A1605 Water Supply Investments Prior Open 17,052.22 Signed Review of Detailed Design ultant Selection 5 4 s for Water Supply Infrastr ucture IDA-SRWSSDP-IC-2017-2 / Institutional Strengthenin 2016-12-0 2016-12-0 2016-12-0 2016-12-2 2016-12-3 2017-01-1 2017-06-2 IDA / D1380 Post Direct Selection Direct 17,028.70 Terminated Institutional specialist g 9 1 9 6 0 1 8 IDA-SRWSSDP-IC-2017-3 / 2016-12-0 2016-12-0 2016-12-0 2016-12-2 2016-12-3 2017-01-1 2017-06-2 2017-12-3 IDA / 59070 Water Supply Investments Post Direct Selection Direct 12,392.86 Completed Infrastructure engineer (1 9 1 9 6 0 1 8 1 position) Page 4 IDA-SRWSSDP-IC-2017-1 / 2016-12-0 2016-12-1 2016-12-0 2016-12-2 2016-12-3 2017-01-1 2017-06-2 2017-11-2 IDA / D1380 Sanitation Development Post Direct Selection Direct 60,000.00 Completed Sanitation and hygene spe 9 9 9 1 0 1 8 9 cialist SRWSSDP-CS-SSS-2017-1 / Preparation of detailed d 2017-04-0 2017-06-0 2017-04-0 2017-06-2 2017-04-2 2017-09-1 2017-10-2 2018-11-3 IDA / 59070 Water Supply Investments Post Direct Selection Direct 0.00 Completed esigns for WSS sub-project 3 5 3 1 4 2 1 0 s in Issyk-Kul oblast (Chelp ek, Darkhan) IDA-SRWSSDP-IC-2017-6 / Institutional Strengthenin Individual Cons 2017-04-1 2017-03-3 2017-04-1 2017-05-2 2017-04-1 2017-05-2 2017-05-0 2017-10-2 Social mobilisation on insti IDA / D1380 Post Open 0.00 Canceled g ultant Selection 1 0 1 5 1 5 2 9 tutional strengthening IDA-SRWSSDP-2017-7 / So Institutional Strengthenin Individual Cons 2017-04-1 2017-04-0 2017-04-1 2017-05-2 2017-04-1 2017-05-2 2017-05-0 2017-06-0 2017-10-2 2020-01-0 cial mobilisation expert o IDA / D1380 Post Open 13,784.43 Completed g ultant Selection 1 3 1 2 1 9 2 7 9 7 n institutional strengthenin g IDA-SRWSSDP-IC-2017-5 / Institutional Strengthenin Individual Cons 2017-04-1 2017-04-0 2017-05-3 2017-05-2 2017-06-2 2017-05-2 2017-07-2 2018-01-2 Local experts on social mo IDA / D1380 Post Open 0.00 Canceled g ultant Selection 1 3 0 2 0 9 5 1 bilization and institutional development IDA-SRWSSDP-IC-2017-8 / Institutional Strengthenin Individual Cons 2017-04-1 2017-04-0 2017-04-1 2017-05-2 2017-04-1 2017-05-2 2017-05-0 2017-06-0 2017-10-2 2020-01-0 Local social mobilisation e IDA / D1380 Post Open 17,190.99 Completed g ultant Selection 1 3 1 2 1 9 2 7 9 7 xpert on institutional stren gthening IDA-RWSSDP-CS-IC-2017- Individual Cons 2017-05-1 2019-04-1 2017-07-0 2017-06-1 2017-07-2 2017-06-1 2017-09-0 2017-06-1 2018-02-2 2018-06-3 3 / Field technical supervis IDA / 59070 Water Supply Investments Post Open 0.00 Completed ultant Selection 9 0 7 9 8 9 1 9 8 0 ion engineer in Togotoi IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 -8 / Field technical supervi IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 9 9 7 8 1 8 sion engineer Kurama IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 IDA / 59070 Water Supply Investments Post Open 0.00 Canceled -9 / Assistant of field engin ultant Selection 9 7 8 1 8 eer in Togotoi IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 IDA / 59070 Water Supply Investments Post Open 0.00 Canceled -10 / Assistant of field engi ultant Selection 9 7 8 1 8 neer in Sultan IDA-SRWSSDP-2017-11 / A Individual Cons 2017-05-1 2018-08-0 2017-07-0 2018-09-0 2017-07-2 2018-09-0 2017-09-0 2018-09-1 2018-02-2 2019-05-1 IDA / 59070 Water Supply Investments Post Open 3,932.44 Completed ssistant of field engineer in ultant Selection 9 1 7 6 8 6 1 9 8 2 Kyrgyz Ata IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 -12 / Assistant of field engi IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 9 7 8 1 8 neer in Kurama SRWSSDP-DS-2017-1 / Pre paration of detailed design 2017-06-1 2017-06-0 2017-06-2 2017-06-2 2017-09-0 2017-09-1 2018-03-0 2018-12-0 IDA / 59070 Water Supply Investments Post Direct Selection Direct 53,560.16 Completed s for WSS sub-projects in I 9 2 9 1 2 8 1 7 K oblast: Chelpek, Darkhan IDA-SRWSSDP-IC-2017-9 / Institutional Strengthenin Individual Cons 2017-06-0 2017-07-2 2017-08-1 2017-09-2 2018-03-2 IDA / 59070 Prior Open 0.00 Canceled International contract supe g ultant Selection 8 7 7 1 0 rvision IDA-SRWSSDP-IC-2017-11 Individual Cons Under Impleme 2017-08-1 2017-08-2 2017-10-0 2017-12-0 2017-10-2 2018-01-1 2017-11-2 2018-05-2 IDA / D1380 Water Supply Investments Prior Open 0.00 / International contract su ultant Selection ntation 6 3 4 4 5 9 9 8 pervision IDA-SRWSSDP-IC-2017-12 Individual Cons 2017-08-1 2017-07-1 2017-10-1 2016-09-2 2017-11-0 2017-10-3 2017-12-0 2017-11-1 2018-06-0 2018-10-1 / Consultant for review th IDA / 59070 Water Supply Investments Post Open 50,000.00 Completed ultant Selection 6 2 3 6 3 0 8 7 6 5 e designs for sub-projects IDA-SRWSSDP-IC-2017-13 Institutional Strengthenin Individual Cons 2017-08-2 2017-10-1 2017-10-3 2017-12-0 2018-06-0 IDA / 59070 Post Open 0.00 Canceled / Hydrogeologist g ultant Selection 2 0 1 5 3 IDA-SRWSSDP-CW-2017-5 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 / Field technical supervisio IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 9 7 8 1 8 n engineer in Sultan IDA-SRWSSDP-IC-2017-4 / Individual Cons 2016-12-0 2016-12-0 2017-01-2 2016-12-2 2017-02-1 2016-12-2 2017-03-2 2017-01-1 2017-09-2 2018-07-1 IDA / 59070 Water Supply Investments Post Open 8,577.56 Completed Infrastructure engineer 2 ultant Selection 9 5 7 9 7 9 4 8 0 5 IDA-SRWSSDP-SSS-17-5 / 2017-06-0 2017-07-2 2017-06-1 2017-06-1 2017-08-1 2017-06-3 2018-02-1 2019-10-1 IDA / 59070 Water Supply Investments Post Direct Selection Direct 20,711.54 Completed Author supervision 1 6 1 3 5 0 1 5 IDA-SRWSSDP-IC-2017-29 Institutional Strengthenin Individual Cons 2017-10-1 2017-03-3 2017-12-0 2017-10-1 2017-12-2 2017-10-1 2018-01-2 2017-10-2 2018-07-2 2020-01-1 / Social mobilisation on ins IDA / 59070 Post Open 15,648.99 Completed g ultant Selection 3 1 1 3 2 3 6 2 5 2 titutional strengthening IDA-SRWSSDP-IC-2017-30 Institutional Strengthenin Individual Cons 2017-10-1 2018-03-3 2017-12-0 2017-10-1 2017-12-2 2017-10-1 2018-01-2 2017-10-2 2018-07-2 2018-07-0 / Social mobilisation on ins IDA / 59070 Post Open 6,015.04 Completed g ultant Selection 3 0 1 3 2 3 6 2 5 9 titutional strengthening IDA-SRWSSDP-IC-2017-31 Institutional Strengthenin Individual Cons 2017-10-1 2017-10-3 2017-12-0 2017-10-1 2017-12-2 2017-10-1 2018-01-2 2017-10-2 2018-07-2 2020-01-1 / Social mobilisation on ins IDA / 59070 Post Open 13,892.03 Completed g ultant Selection 3 0 1 3 2 3 6 2 5 2 titutional strengthening IDA-SRWSSDP-IC-2017-32 Institutional Strengthenin Individual Cons 2017-10-1 2017-03-3 2017-12-0 2017-10-1 2017-12-2 2017-10-1 2018-01-2 2017-10-2 2018-07-2 2020-01-1 / Social mobilisation on ins IDA / 59070 Post Open 14,499.97 Completed g ultant Selection 3 0 1 3 2 3 6 2 5 2 titutional strengthening IDA-SRWSSDP-IC-2017-33 Individual Cons 2017-10-0 2017-05-1 2017-11-1 2017-09-2 2017-12-1 2017-09-2 2018-01-1 2017-09-3 2018-07-1 2019-04-0 / Junior field technical supe IDA / 59070 Water Supply Investments Post Open 6,015.04 Completed ultant Selection 1 2 9 0 0 1 4 0 3 9 rvision engineer IDA-SRWSSDP-IC-2017-34 Individual Cons 2017-10-0 2017-05-1 2017-11-1 2017-09-2 2017-12-1 2017-09-2 2018-01-1 2017-09-3 2018-07-1 2018-07-0 / Junior field technical supe IDA / 59070 Water Supply Investments Post Open 6,015.04 Completed ultant Selection 1 2 9 0 0 1 4 0 3 9 rvision engineer IDA-SRWSSDP-IC-17-5 / So Institutional Strengthenin Individual Cons 2017-06-0 2017-03-3 2017-07-2 2017-05-2 2017-08-1 2017-05-2 2017-09-1 2017-06-1 2018-03-1 2018-07-0 cial mobilisation on institut IDA / 59070 Post Open 6,874.33 Completed g ultant Selection 1 0 0 5 0 5 4 0 3 9 ional strengthening IDA-SRWSSDP-IC-17-6 / So Institutional Strengthenin Individual Cons 2017-06-0 2017-07-2 2017-08-1 2017-09-1 2018-03-1 cial mobilisation on institut IDA / 59070 Post Open 0.00 Canceled g ultant Selection 1 0 0 4 3 ional strengthening IDA-SRWSSDP-IC-17-7 / So Institutional Strengthenin Individual Cons 2017-06-0 2017-03-3 2017-07-2 2017-05-2 2017-08-1 2017-05-2 2017-09-1 2017-06-0 2018-03-1 2019-12-3 cial mobilisation on institut IDA / 59070 Post Open 0.00 Completed g ultant Selection 1 1 0 5 0 5 4 1 3 1 ional strengthening IDA-SRWSSDP-IC-17-8 / So Institutional Strengthenin Individual Cons 2017-06-0 2017-03-3 2017-07-2 2017-05-2 2017-08-1 2017-05-2 2017-09-1 2018-03-1 cial mobilisation on institut IDA / 59070 Post Open 0.00 Canceled g ultant Selection 1 1 0 5 0 5 4 3 ional strengthening IDA-SRWSSDP-IC-17-9 / Fi Individual Cons 2017-06-1 2017-05-1 2017-08-0 2017-08-2 2017-10-0 2018-03-3 IDA / 59070 Water Supply Investments Post Open 0.00 Canceled eld technical supervision e ultant Selection 9 9 7 8 2 1 ngineer IDA-SRWSSDP-IC-17-10 / F Individual Cons 2017-07-1 2017-05-1 2017-09-0 2017-07-1 2017-09-2 2017-07-1 2017-10-3 2017-07-1 2018-04-2 2018-01-1 IDA / 59070 Water Supply Investments Post Open 0.00 Completed ield technical supervision ultant Selection 7 2 4 3 5 3 0 4 8 7 engineer IDA-SRWSSDP-IC-17-12 / Individual Cons 2017-08-2 2019-04-1 2017-10-1 2017-08-2 2017-11-0 2017-08-2 2017-12-0 2017-09-0 2018-06-0 2018-09-0 IDA / 59070 Water Supply Investments Post Open 15.57 Completed Hydrogeologist ultant Selection 4 1 2 3 2 4 7 2 5 9 IDA-SRWSSDP-IC-17-13 / F Individual Cons 2017-09-0 2017-05-1 2017-10-2 2017-08-2 2017-11-1 2017-09-0 2017-12-1 2017-09-0 2018-06-1 2019-05-3 IDA / 59070 Water Supply Investments Post Open 0.00 Completed ield technical supervision ultant Selection 4 2 3 9 3 4 8 4 6 1 engineer IDA-SRWSSDP-IC-17-14 / F Individual Cons 2017-08-2 2019-04-1 2017-10-1 2017-07-3 2017-11-0 2017-08-2 2017-12-0 2017-08-2 2018-06-0 2020-08-3 IDA / 59070 Water Supply Investments Post Open 0.00 Completed ield technical supervision ultant Selection 5 0 3 1 3 4 8 4 6 1 engineer IDA-SRWSSDP-IC-17-15 / F Individual Cons 2017-09-0 2019-04-1 2017-10-2 2017-07-3 2017-11-1 2017-09-0 2017-12-1 2017-09-1 2018-06-1 2018-02-2 IDA / 59070 Water Supply Investments Post Open 2,571.61 Completed ield technical supervision ultant Selection 4 0 3 1 3 4 8 3 6 7 engineer IDA-SRWSSDP-IC-17-36 / S Individual Cons 2017-11-1 2017-10-0 2018-01-0 2017-11-1 2018-01-2 2017-11-1 2018-02-2 2017-11-2 2018-08-2 2019-01-1 IDA / 59070 Sanitation Development Post Open 9,292.35 Completed anitation & Hygiene Specia ultant Selection 4 3 2 0 3 3 7 6 6 2 list IDA-SRWSSDP-IC-2017-37 Individual Cons 2017-12-0 2017-05-1 2018-01-1 2017-11-3 2018-02-0 2017-11-3 2018-03-1 2017-12-0 2018-09-1 2019-04-3 / Junior field technical supe IDA / 59070 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 2 9 0 9 0 6 1 2 0 rvision engineer IDA-SRWSSDP-IC-2017-38 Individual Cons Under Impleme 2017-12-0 2017-12-0 2018-01-1 2018-02-0 2018-03-1 2018-09-1 / Junior field technical supe IDA / 59070 Water Supply Investments Post Open 0.00 ultant Selection ntation 1 1 9 9 6 2 rvision engineer IDA-SRWSSDP-IC-2017-39 Individual Cons 2017-02-1 2018-11-0 2017-03-3 2017-12-2 2017-04-2 2017-12-2 2017-05-2 2018-01-1 2017-11-2 2018-08-0 / PR consultant for commu IDA / 59070 Sanitation Development Post Open 41,876.99 Completed ultant Selection 0 2 1 9 1 9 6 6 2 9 nication strategy IDA-SRWSSDP-IC-2017-44 / Local consultant for supp Institutional Strengthenin Individual Cons 2017-11-3 2018-01-1 2018-02-0 2018-03-1 2018-09-1 IDA / 59070 Post Open 0.00 Canceled orting CDWUU in financial g ultant Selection 0 8 8 5 1 planning and developmen t of tarifs IDA-SRWSSDP-IC-2017-45 Institutional Strengthenin Individual Cons 2017-11-3 2018-01-1 2018-02-0 2018-03-1 2018-09-1 IDA / 59070 Post Open 0.00 Canceled / Billing system consultant g ultant Selection 0 8 8 5 1 IDA-SRWSSDP-IC-2018-4 / Consultant for supporting of advanced financing of t Institutional Strengthenin Individual Cons 2018-11-0 2018-12-2 2019-01-1 2019-02-1 2019-08-1 he sector, including planni IDA / 59070 Post Open 0.00 Canceled g ultant Selection 1 0 0 4 3 ng of investments, financia l modelling, regulation, mo nitoring, survey of tarifs (i nternational consulatnt) IDA-SRWSSDP-IC-2018-5 / Consultant for developmen Institutional Strengthenin Individual Cons 2017-11-0 2017-12-2 2018-01-1 2018-02-1 2018-08-1 IDA / 59070 Post Open 0.00 Canceled t and piloting of new mod g ultant Selection 1 0 0 4 3 els of services manageme nt (international) IDA-SRWSSDP-IC-2018-6 / Consultant for developmen Institutional Strengthenin Individual Cons 2019-01-1 2019-03-0 2019-03-2 2019-04-3 2019-10-2 IDA / 59070 Post Open 0.00 Canceled t of institutional support pl g ultant Selection 5 5 6 0 7 an for DWSS (international ) IDA-SRWSSDP-IC-2018-36 Institutional Strengthenin Individual Cons 2017-12-0 2018-01-1 2018-02-0 2018-03-1 2018-09-1 / Consultant for developm IDA / 59070 Post Open 0.00 Canceled g ultant Selection 1 9 9 6 2 ent of legal acts in WSS sp here IDA-SRWSSDP-IC-2017-17 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-10-0 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 3 4 8 3 5 IDA-SRWSSDP-IC-2017-18 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-19 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-20 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-21 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-22 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,053.84 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-23 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-24 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-25 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-26 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-27 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-28 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 5,050.94 Completed / Trеiner-facilitator ultant Selection 1 0 9 0 0 9 4 8 3 5 IDA-SRWSSDP-IC-2017-35 Individual Cons 2017-11-0 2017-03-3 2017-12-2 2017-08-1 2018-01-1 2017-09-2 2018-02-1 2017-11-1 2018-08-1 2018-06-1 IDA / 59070 Sanitation Development Post Open 4,417.04 Completed / Trеiner-facilitator ultant Selection 1 0 0 0 0 9 4 9 3 5 IDA-SRWSSDP-IC-2017-42 Institutional Strengthenin Individual Cons 2017-11-2 2018-01-1 2018-02-0 2018-03-1 2018-09-0 / Trainer for capacity build IDA / 59070 Post Open 0.00 Canceled g ultant Selection 8 6 6 3 9 ing of WSS sector institutio ns IDA-SRWSSDP-IC-2018-2 / Institutional Strengthenin Individual Cons 2018-01-1 2018-02-2 2018-03-2 2018-04-2 2018-10-2 GIS consultant and IT cons IDA / 59070 Post Open 0.00 Canceled g ultant Selection 0 8 1 5 2 ultant (1 person) IDA-SRWSSDP-DS-2018-1 2018-03-0 2018-02-1 2018-03-1 2018-03-2 2018-05-1 2018-05-1 2018-11-1 2018-11-3 / Preparation of detailed d IDA / 59070 Water Supply Investments Post Direct Selection Direct 19,990.19 Completed 1 4 1 2 5 7 1 0 esigns for WSS sub-project s in Oshoblast: Korul Page 5 IDA-SRWSSDP-DS-2018-2 / Preparation of detailed d 2018-03-0 2018-02-1 2018-03-1 2018-03-2 2018-05-1 2018-05-1 2018-11-1 2018-11-1 esigns for WSS sub-project IDA / 59070 Water Supply Investments Post Direct Selection Direct 57,004.80 Completed 1 4 1 2 5 7 1 5 s in IK and Chui oblasts: Ta mga, Ichke-Bulun, Gornay a Maevka. IDA-SRWSSDP-DS-2018-3 2018-03-0 2018-02-1 2018-03-1 2018-03-2 2018-05-1 2018-05-1 2018-11-1 2019-08-3 / Preparation of detailed d IDA / 59070 Water Supply Investments Post Direct Selection Direct 13,624.20 Completed 1 4 1 2 5 7 1 0 esigns for WSS sub-project s in IK oblast: Ak-Bulak IDA-SRWSSDP-IC-2018-13 / Coordinator of a Team for Institutional Strengthenin Individual Cons 2018-04-2 2018-03-0 2018-06-0 2018-03-2 2018-06-2 2018-03-2 2018-07-3 2018-04-1 2019-12-3 2019-01-1 development and impleme IDA / D1380 Post Open 21,779.99 Completed g ultant Selection 5 2 5 9 6 9 1 7 1 9 ntation of Rural Water Sup ply and Sanitation Informa tion System (SIASAR) IDA-SRWSSDP-IC-2018-12 / Web Developer Specialist Institutional Strengthenin Individual Cons 2018-04-2 2018-03-0 2018-06-1 2018-04-1 2018-07-0 2018-04-2 2018-08-1 2018-05-0 2019-12-3 2019-01-1 IDA / D1380 Post Open 11,118.28 Completed Information System for Rur g ultant Selection 7 2 5 3 6 0 0 9 1 9 al Water Supply and Sanit ation (SIASAR) IDA-SRWSSDP-IC-2018-14 Institutional Strengthenin Individual Cons 2018-04-2 2018-03-0 2018-06-1 2018-03-2 2018-07-0 2018-04-2 2018-08-1 2019-12-3 2018-12-3 / IT-System Specialist for R IDA / D1380 Post Open 0.00 Completed g ultant Selection 7 2 5 9 6 3 0 1 1 ural Water Supply and San itation (SIASAR) IDA-SRWSSDP-IC-2018-11 / Sector Monitoring Special Institutional Strengthenin Individual Cons 2018-04-2 2018-03-0 2018-06-1 2018-03-2 2018-07-0 2018-03-2 2018-08-0 2018-04-1 2019-12-3 2019-12-3 ist for development and im IDA / D1380 Post Open 21,522.85 Completed g ultant Selection 5 2 3 9 4 9 8 7 1 1 plementation of Informatio n System for Rural Water S upply and Sanitation (SIAS AR) IDA-SRWSSDP-IC-2017-40 / Consultant for rehabilitati Individual Cons 2017-12-0 2018-11-2 2018-01-2 2018-02-1 2018-03-2 2018-09-1 on of indoor sanitary facilit IDA / 59070 Sanitation Development Post Open 0.00 Canceled ultant Selection 6 8 4 4 1 7 ies in schools of Osh oblast with survey, preparation of BoQ and drawings IDA-SRWSSDP-IC-2017-41 / Consultant for rehabilitati Individual Cons 2017-12-0 2018-11-2 2018-01-2 2018-02-1 2018-03-2 2018-09-1 on of indoor sanitary facilit IDA / 59070 Sanitation Development Post Open 0.00 Canceled ultant Selection 6 8 4 4 1 7 ies in schools of Chuy obla st with survey, preparation of BoQ and drawings IDA-SRWSSDP-SSS-18-6 / 2019-02-1 2019-04-2 2019-02-2 2019-05-1 2019-04-2 2019-05-1 2019-10-2 2020-12-3 Author supervision of Kun- IDA / 59070 Water Supply Investments Post Direct Selection Direct 0.00 Completed 1 0 1 4 7 7 4 1 Tuu, Kyzyl-Tuu, Tolok and Alekseevka subprojects IDA-SRWSSDP-IC-2018-40 / Consultant for rehabilitati on of indoor sanitary facilit Individual Cons 2019-02-1 2019-02-1 2019-04-0 2017-12-1 2019-04-2 2017-12-2 2019-05-2 2018-01-2 2019-11-2 2018-06-1 IDA / 59070 Sanitation Development Post Open 11,354.54 Completed ies in schools and SES of C ultant Selection 1 3 1 1 2 5 7 3 3 8 hui, Issyk-Kul oblasts with survey, preparation of BoQ and drawings. (1st Phase) IDA-SRWSSDP-IC-2018-29 / Consultant for rehabilitati on of indoor sanitary facilit Individual Cons 2019-02-1 2019-02-1 2019-04-0 2018-07-2 2019-04-2 2018-07-2 2019-05-2 2018-08-0 2019-11-2 2019-02-1 IDA / 59070 Sanitation Development Post Open 13,095.72 Completed ies in schools and SES of C ultant Selection 1 3 1 3 2 3 7 8 3 2 hui, Issyk-Kul oblasts with survey, preparation of BoQ and drawings. (2st phase) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-04-0 2020-06-3 2021-03-1 TF / A1605 Post Open 13,784.66 Completed 2019-1 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 6 0 9 ant ( # 1) IDA-SRWSSDP-DS-2018-4 / Consultants for Author su 2019-02-1 2019-02-1 2019-02-2 2019-03-0 2019-04-2 2019-03-2 2019-10-2 2019-09-1 pervision for rehabilitation IDA / 59070 Sanitation Development Post Direct Selection Direct 5,191.15 Completed 1 3 1 1 7 0 4 4 of indoor sanitary facilities in schools and SES of Chui, Issyk-Kul oblasts (1st phas e). IDA-SRWSSDP-IC-2018-41 / Consultant for rehabilitati on of indoor sanitary facilit Individual Cons 2019-02-1 2019-02-1 2019-04-0 2017-12-1 2019-04-2 2017-12-2 2019-05-2 2018-01-2 2019-11-2 2018-06-1 IDA / 59070 Sanitation Development Post Open 11,487.34 Completed ies in schools and SES of O ultant Selection 1 3 1 1 2 5 7 3 3 8 sh oblast with survey, prep aration of BoQ and drawin gs. (1st phase) IDA-SRWSSDP-DS-2018-5 / Consultants for Author su 2019-02-1 2019-02-1 2019-02-2 2019-05-0 2019-04-2 2019-03-2 2019-10-2 2019-09-1 pervision for rehabilitation IDA / 59070 Sanitation Development Post Direct Selection Direct 5,014.66 Completed 1 3 1 1 7 1 4 4 of indoor sanitary facilities in schools and SES of Osh oblast (1st phase). IDA-SRWSSDP-IC-2018-30 / Consultant for rehabilitati on of indoor sanitary facilit Individual Cons 2019-02-1 2019-02-1 2019-04-0 2018-07-1 2019-04-2 2018-07-2 2019-05-2 2018-07-3 2019-11-2 2019-01-3 IDA / 59070 Sanitation Development Post Open 17,016.71 Completed ies in schools and SES of O ultant Selection 1 3 1 8 2 3 7 0 3 1 sh oblast with survey, prep aration of BoQ and drawin gs. (2st phase) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-03-0 TF / A1605 Post Open 10,202.42 Completed 2019-2 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 5 0 5 ant ( # 2) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-02-0 TF / A1605 Post Open 10,202.42 Completed 2019-3 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 5 0 5 ant ( # 3) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2020-11-0 TF / A1605 Post Open 9,658.29 Completed 2019-4 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 5 0 4 ant ( # 4) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-1 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-03-0 TF / A1605 Post Open 9,658.29 Completed 2019-5 / Validation Consult g ultant Selection 1 3 1 3 2 2 7 5 0 1 ant ( # 5) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,933.25 Completed 2019-6 / Validation Consult g ultant Selection 1 3 1 2 2 2 7 8 0 6 ant ( # 6) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,933.25 Completed 2019-7 / Validation Consult g ultant Selection 1 3 1 2 2 2 7 8 0 6 ant ( # 7) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,933.25 Completed 2019-8 / Validation Consult g ultant Selection 1 3 1 2 2 2 7 8 0 6 ant ( # 8) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,939.04 Completed 2019-9 / Validation Consult g ultant Selection 1 3 1 2 2 2 7 8 0 6 ant ( # 9) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2019-02-1 2019-02-1 2019-04-0 2019-03-2 2019-04-2 2019-03-2 2019-05-2 2019-03-2 2020-06-3 2021-04-0 TF / A1605 Post Open 15,939.04 Completed 2019-10 / Validation Consu g ultant Selection 1 3 1 2 2 2 7 8 0 6 ltant ( # 10) IDA-SRWSSDP-IC-2019-9 / Technical Supervisor for El Individual Cons 2019-03-0 2019-02-2 2019-03-1 2019-04-0 2019-04-0 2019-04-0 2019-05-0 2019-04-2 2019-11-0 2019-06-2 IDA / 59070 Water Supply Investments Post Limited 1,679.74 Completed ectrical Installation, Pre-co ultant Selection 8 8 3 5 3 9 8 5 4 6 mmissioning and Electricit y Supply IDA-SRWSSDP-IC-2017-16 Individual Cons 2017-10-0 2017-03-3 2017-11-1 2017-08-1 2017-12-1 2017-09-2 2018-01-1 2017-10-1 2018-07-1 IDA / 59070 Sanitation Development Post Open 5,050.95 Terminated / Trеiner-facilitator in Kura ultant Selection 1 0 9 0 0 9 4 0 3 ma IDA-SRWSSDP-IC-2019-8 / Individual Cons 2019-02-1 2019-12-2 2019-04-0 2020-06-3 2019-04-2 2020-06-3 2019-05-3 2020-07-1 2019-11-2 IDA / 59070 Water Supply Investments Post Open 29,538.31 Signed Quality Assurance Enginee ultant Selection 5 5 5 0 6 0 1 4 7 r IDA-SRWSSDP-IC-2019-31 Institutional Strengthenin Individual Cons 2019-04-1 2019-04-0 2019-04-1 2019-04-1 2019-05-0 2019-06-1 2022-06-0 / Senior Institutional Devel TF / A1605 Prior Limited 0.00 Canceled g ultant Selection 2 4 7 0 8 2 8 opment Advisor IDA-SRWSSDP-IC-2019-32 Individual Cons 2019-04-1 2019-06-2 2019-04-1 2019-07-2 2019-05-0 2019-08-0 2019-06-1 2019-08-1 2019-12-0 2020-01-0 IDA / 59070 Water Supply Investments Post Limited 2,500.00 Completed / Supervision Engineer/Hyd ultant Selection 2 0 7 9 8 6 2 3 9 9 rogeologist IDA-SRWSSDP-IC-2019-33 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2020-03-1 2019-05-0 2020-04-3 2019-06-1 2020-05-2 2020-06-0 2021-01-1 / Field technical supervisio IDA / 59070 Water Supply Investments Post Limited 7,050.02 Completed ultant Selection 2 0 7 6 8 0 2 4 6 6 n for Ichke-Bulun subproje ct IDA-SRWSSDP-IC-2019-34 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-07-0 2019-05-0 2019-07-0 2019-06-1 2019-08-0 2020-06-0 2020-01-1 / Field technical supervisio IDA / 59070 Water Supply Investments Post Limited 8,513.23 Completed ultant Selection 2 0 7 1 8 8 2 5 6 6 n for Korul subproject IDA-SRWSSDP-IC-2019-35 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2020-03-1 2019-05-0 2020-04-3 2019-06-1 2020-05-2 2020-06-0 2021-10-1 / Junior field technical supe IDA / 59070 Water Supply Investments Post Limited 7,944.02 Completed ultant Selection 2 0 7 6 8 0 2 4 6 3 rvision for Korul subproject IDA-SRWSSDP-IC-2019-36 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-05-0 2019-06-1 2020-06-0 / Junior field technical supe IDA / 59070 Water Supply Investments Post Limited 0.00 Canceled ultant Selection 2 0 7 8 2 6 rvision for Ichke-Bulun sub project IDA-SRWSSDP-IC-2019-37 / Local expert on social mo Institutional Strengthenin Individual Cons 2019-04-1 2019-04-1 2019-04-1 2020-01-1 2019-05-0 2020-01-1 2019-06-1 2021-06-0 IDA / 59070 Post Limited 0.00 Canceled bilization and institutional g ultant Selection 2 0 7 0 8 3 2 1 development in Ichke-Bulu n subproject IDA-SRWSSDP-IC-2019-38 / Local expert on social mo Institutional Strengthenin Individual Cons 2019-04-1 2019-04-1 2019-04-1 2020-01-0 2019-05-0 2020-01-1 2019-06-1 2021-06-0 IDA / 59070 Post Limited 0.00 Canceled bilization and institutional g ultant Selection 2 0 7 8 8 0 2 1 development in Korul subp roject IDA-SRWSSDP-IC-2019-29 / Local expert on social mo Institutional Strengthenin Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-1 2019-06-1 2019-03-2 2021-06-0 2020-01-0 IDA / 59070 Post Limited 5,902.25 Completed bilization and institutional g ultant Selection 2 0 7 1 8 2 2 8 1 7 development in Chelpek s ubproject IDA-SRWSSDP-IC-2019-30 / Local expert on social mo Institutional Strengthenin Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-1 2019-06-1 2019-03-2 2021-06-0 2020-01-0 IDA / 59070 Post Limited 5,493.86 Completed bilization and institutional g ultant Selection 2 0 7 1 8 2 2 8 1 7 development in Darkan su bproject IDA-SRWSSDP-IC-2019-10 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-2 2019-06-1 2019-03-2 2020-06-0 2020-01-0 / Field technical supervisio IDA / 59070 Water Supply Investments Post Limited 12,857.14 Completed ultant Selection 2 0 7 2 8 0 2 8 6 7 n for Chelpek subproject IDA-SRWSSDP-IC-2019-11 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-2 2019-06-1 2019-03-2 2020-06-0 2020-12-0 / Field technical supervisio IDA / 59070 Water Supply Investments Post Limited 17,420.81 Completed ultant Selection 2 0 7 2 8 2 2 8 6 7 n for Darkan subproject IDA-SRWSSDP-IC-2019-12 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-2 2019-06-1 2019-03-2 2020-06-0 2020-01-0 / Junior field technical supe IDA / 59070 Water Supply Investments Post Limited 5,560.41 Completed ultant Selection 2 0 7 2 8 0 2 8 6 7 rvision for Chelpek subproj ect IDA-SRWSSDP-IC-2019-13 Individual Cons 2019-04-1 2019-04-1 2019-04-1 2019-03-1 2019-05-0 2019-03-2 2019-06-1 2019-04-0 2020-06-0 2020-11-1 / Junior field technical supe IDA / 59070 Water Supply Investments Post Limited 10,430.21 Completed ultant Selection 2 0 7 2 8 0 2 3 6 5 rvision for Darkan subproje ct IDA-SRWSSDP-IC-2018-15 / Consultant Development of the training manual and Individual Cons 2018-02-0 2018-02-0 2018-02-0 2018-03-2 2018-02-2 2018-04-0 2018-04-0 2018-04-0 2018-10-0 2019-04-0 IDA / 59070 Sanitation Development Post Limited 11,670.24 Completed related materials for the R ultant Selection 2 8 7 2 8 2 4 8 1 6 esult-Based Sanitation Gra nts for household sanitatio n improvements IDA-SRWSSDP-SSS-19-1 / Consulting company for de 2019-07-3 2019-08-2 2019-08-1 2019-08-2 2019-09-0 2020-01-0 sign development / adapta IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Canceled 1 1 0 1 8 6 tion for rural water supply subproject Chaichy, Osh O blast IDA-SRWSSDP-IC-2019-17 Individual Cons 2019-08-2 2019-08-2 2019-08-3 2020-01-2 2019-09-2 2020-01-3 2019-10-1 2020-02-1 2020-10-1 2020-11-1 / PR consultant for commu IDA / D1380 Sanitation Development Post Limited 8,645.58 Completed ultant Selection 3 3 0 8 0 0 8 6 7 3 nication strategy IDA-SRWSSDP-IC-2019-14 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed / Field sanitation officer in ultant Selection 0 4 4 4 4 5 1 7 6 0 schools #1 IDA-SRWSSDP-IC-2019-15 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed / Field sanitation officer in ultant Selection 0 4 4 4 4 5 1 4 6 7 schools #2 IDA-SRWSSDP-IC-2019-16 Individual Cons 2019-01-1 2019-01-1 2019-01-1 2019-03-1 2019-02-0 2019-03-1 2019-03-1 2019-04-0 2019-12-0 2020-01-1 IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed / Field sanitation officer in ultant Selection 0 4 5 4 5 5 2 4 7 7 schools #3 IDA-SRWSSDP-IC-19-17 / F Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed ield sanitation officer in sc ultant Selection 0 4 4 4 4 5 1 4 6 7 hools #4 IDA-SRWSSDP-IC-2019-18 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed / Field sanitation officer in ultant Selection 0 4 4 5 4 8 1 7 6 0 schools #5 IDA-SRWSSDP-IC-2019-19 Individual Cons 2019-01-1 2019-01-1 2019-01-1 2019-03-1 2019-02-0 2019-03-1 2019-03-1 2019-04-0 2019-12-0 2020-01-2 IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed / Field sanitation officer in ultant Selection 0 4 7 5 7 8 4 7 9 0 schools #6 IDA-SRWSSDP-IC-2019-20 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 7 6 0 communities #1 IDA-SRWSSDP-IC-2019-21 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 7 6 0 communities #2 IDA-SRWSSDP-IC-2019-22 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 4 6 7 communities #3 IDA-SRWSSDP-IC-2019-23 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 4 6 7 communities #4 Page 6 IDA-SRWSSDP-IC-2019-24 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,822.71 Completed ultant Selection 0 4 4 4 4 5 1 7 6 0 communities #5 IDA-SRWSSDP-IC-2019-25 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-1 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,823.51 Completed ultant Selection 0 4 4 4 4 5 1 4 6 7 communities #6 IDA-SRWSSDP-IC-2019-26 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed ultant Selection 0 4 4 5 4 8 1 7 6 0 communities #7 IDA-SRWSSDP-IC-2019-27 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed ultant Selection 0 4 4 5 4 8 1 7 6 0 communities #8 IDA-SRWSSDP-IC-2019-28 Individual Cons 2019-01-1 2019-01-1 2019-01-2 2019-03-1 2019-02-1 2019-03-1 2019-03-2 2019-04-0 2019-12-1 2020-01-2 / Field sanitation officer in IDA / D1380 Sanitation Development Post Limited 5,826.72 Completed ultant Selection 0 4 4 5 4 8 1 7 6 0 communities #9 IDA-SRWSSDP-AF-IC-2019 -39 / Independent Verificat ion Agent (IVA) for Househ Individual Cons 2019-12-1 2019-12-1 2019-12-2 2020-01-2 2020-01-1 2020-01-2 2020-02-1 2020-02-1 2021-02-1 2020-03-0 IDA / D1380 Sanitation Development Post Limited 466.07 Completed old Sanitary Facilities in Ak ultant Selection 3 3 3 1 3 7 7 9 6 8 -Bulak and Kotormo pilot v illages Kyrgyz-Ata subproj ect Osh Oblast IDA-SRWSSDP-IC-INST-20 Institutional Strengthenin Individual Cons 2020-01-2 2020-01-3 2020-02-2 2020-03-2 2023-04-0 20-1-RT1 / Senior Institutio TF / A1605 Post Limited 0.00 Canceled g ultant Selection 4 1 1 7 1 nal Development Advisor IDA-SRWSSDP-IC-19-10 / Individual Cons 2019-01-1 2019-05-2 2019-01-2 2019-06-2 2019-02-1 2019-06-2 2019-03-2 2019-07-0 2020-03-2 2020-01-0 Consultant on promoting IDA / D1380 Sanitation Development Post Limited 4,535.57 Completed ultant Selection 0 7 4 6 4 8 1 7 0 7 WASH in schools and ISH i n communities IDA-SRWSSDP-IC-2019-18 Individual Cons 2019-06-0 2019-06-0 2019-06-0 2019-08-2 2019-06-2 2019-08-2 2019-08-0 2019-09-1 2019-08-0 2022-06-3 IDA / D1380 Sanitation Development Post Limited 20,413.39 Completed -AF / Sanitation Subsidy Co ultant Selection 3 3 8 3 9 6 3 5 6 0 nsultant IDA-SRWSSDP-IC-СOMP2- 2020-1 / Consultant for Tra ining of Trainers in “Active Individual Cons 2020-02-0 2020-05-0 2020-02-2 2020-03-1 2020-04-1 2021-04-1 legal regulatory acts in dri IDA / D1380 Sanitation Development Post Limited 0.00 Canceled ultant Selection 7 1 1 3 7 7 nking water supply and sa nitation for strengthening t he management (supervisi on) of water safety and qu ality in the Kyrgyz Republi IDA-SRWSSDP-IC-СOMP2- c” 2020-2 / Consultant for Tra Individual Cons Under Impleme 2020-02-0 2020-05-0 2020-02-2 2020-03-1 2020-04-1 2020-05-2 IDA / D1380 Sanitation Development Post Limited 0.00 ining in Water Quality Moni ultant Selection ntation 7 1 1 3 7 3 toring Software in SES Rai on Offices IDA-SRWSSDP-IC-СOMP2- 2020-3 / Consultant for De Individual Cons 2020-02-0 2020-05-0 2020-02-2 2020-05-2 2020-03-1 2020-05-2 2020-04-1 2020-06-1 2021-04-1 2021-04-1 velopment of Basic Regula IDA / D1380 Sanitation Development Post Limited 4,727.20 Completed ultant Selection 7 1 1 5 3 7 7 4 7 3 tory Document for Constru ction of Household Sanitati on Facilities IDA-SRWSSDP-IC-TRNG-20 20-8 / Consultant-trainers f Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-03-2 2020-06-1 2020-04-1 2020-08-0 2020-05-2 2020-08-3 2020-11-1 2022-01-1 IDA / D1380 Post Open 1,815.53 Completed or LSGB, CDWUU and othe g ultant Selection 7 0 7 2 7 3 2 1 8 7 r rural water services provi ders’ staff training (# 8) IDA-SRWSSDP-IC-TRNG-20 20-9 / Consultant-trainers f Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-1 2020-06-1 2020-03-0 2020-08-0 2020-04-0 2020-08-3 2020-10-0 2021-09-0 IDA / D1380 Post Limited 3,135.92 Completed or LSGB, CDWUU and othe g ultant Selection 7 0 2 2 4 3 8 1 5 1 r rural water services provi ders’ staff training (# 9) IDA-SRWSSDP-IC-TRNG-20 20-10 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-1 2020-06-1 2020-03-0 2020-08-0 2020-04-0 2020-08-3 2020-10-0 2022-01-1 IDA / D1380 Post Limited 1,815.53 Completed for LSGB, CDWUU and oth g ultant Selection 7 0 2 2 4 3 8 1 5 7 er rural water services pro viders’ staff training (# 10 ) IDA-SRWSSDP-IC-TRNG-20 20-11 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-2 2020-06-1 2020-03-1 2020-08-0 2020-04-1 2020-08-3 2020-10-1 2022-01-1 IDA / D1380 Post Limited 2,900.14 Completed for LSGB, CDWUU and oth g ultant Selection 7 0 1 2 3 3 7 1 4 7 er rural water services pro viders’ staff training (# 11 ) IDA-SRWSSDP-IC-TRNG-20 20-12 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-1 2020-06-1 2020-03-0 2020-08-0 2020-04-0 2020-08-3 2020-10-0 2022-01-1 IDA / D1380 Post Limited 3,135.92 Completed for LSGB, CDWUU and oth g ultant Selection 7 0 2 2 4 3 8 1 5 7 er rural water services pro viders’ staff training (# 12 ) IDA-SRWSSDP-IC-TRNG-20 20-13 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-02-1 2020-06-1 2020-03-0 2020-08-0 2020-04-0 2020-08-3 2020-10-0 2022-01-1 IDA / D1380 Post Limited 1,815.53 Completed for LSGB, CDWUU and oth g ultant Selection 7 0 2 2 4 3 8 1 5 7 er rural water services pro viders’ staff training (# 13 ) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-03-1 IDA / D1380 Post Open 5,969.46 Completed 2020-11 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 6 ltant ( # 11) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2020-06-2 2021-04-1 IDA / D1380 Post Open 5,543.63 Completed 2020-12 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 7 3 ltant ( # 12) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-03-1 IDA / D1380 Post Open 5,542.48 Completed 2020-13 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 6 ltant ( # 13) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-01-1 IDA / D1380 Post Open 5,129.13 Completed 2020-14 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 7 ltant ( # 14) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2020-06-2 2021-03-1 IDA / D1380 Post Open 5,541.72 Completed 2020-15 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 7 6 ltant ( # 15) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-01-1 IDA / D1380 Post Open 5,128.23 Completed 2020-16 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 7 ltant ( # 16) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-03-1 IDA / D1380 Post Open 5,128.23 Completed 2020-17 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 6 ltant ( # 17) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-04-1 IDA / D1380 Post Open 6,022.19 Completed 2020-18 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 3 ltant ( # 18) IDA-SRWSSDP-IC-SIASAR- Institutional Strengthenin Individual Cons 2020-02-0 2020-02-0 2020-03-2 2020-05-2 2020-04-1 2020-06-1 2020-05-2 2020-06-2 2021-05-2 2021-04-1 IDA / D1380 Post Open 6,022.19 Completed 2020-19 / Validation Consu g ultant Selection 7 3 7 1 7 0 2 9 2 3 ltant ( # 19) IDA-SRWSSDP-IC-2019-41 / Trainer on conducting tra Individual Cons 2019-09-0 2019-09-0 2019-09-0 2019-10-1 2019-09-2 2019-10-1 2019-11-0 2019-10-2 2020-04-3 2022-01-1 IDA / D1380 Sanitation Development Post Limited 1,866.04 Completed inings for sanitation field o ultant Selection 2 2 7 0 8 0 2 3 0 7 fficers on WASH in Schools Methodology IDA-SRWSSDP-IC-2019-42 / Trainer on conducting tra Individual Cons 2019-09-0 2019-09-0 2019-09-0 2019-10-1 2019-09-2 2019-10-0 2019-11-0 2019-10-2 2020-04-3 2022-01-1 inings for sanitation field o IDA / D1380 Sanitation Development Post Limited 1,866.04 Completed ultant Selection 2 2 7 0 8 9 2 4 0 7 fficers on Household Sanit ation Improvement Metho dology IDA-SRWSSDP-IC-FIDS-20 20-1 / Local expert on soci Institutional Strengthenin Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-01-0 2019-12-0 2020-01-1 2020-01-1 2020-01-3 2021-01-0 2022-06-3 IDA / D1380 Post Limited 11,950.97 Completed al mobilization and institut g ultant Selection 1 7 5 8 6 0 0 0 9 0 ional development in Sary- Tash subproject IDA-SRWSSDP-IC-FIDS-20 20-2 / Local expert on soci Institutional Strengthenin Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-01-0 2019-12-0 2020-01-1 2020-01-1 2020-01-3 2021-01-0 IDA / D1380 Post Limited 7,304.50 Signed al mobilization and institut g ultant Selection 1 7 5 8 6 0 0 0 9 ional development in Achy k-Suu subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-2 / Local expert on s Institutional Strengthenin Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-01-1 2019-12-0 2020-01-1 2020-01-1 2020-02-0 2020-07-0 2022-06-3 IDA / D1380 Post Limited 11,463.69 Completed ocial mobilization and insti g ultant Selection 1 7 5 0 6 2 0 2 8 0 tutional development in Ak -Bulak subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-4 / Local expert on s Institutional Strengthenin Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-01-1 2019-12-0 2020-01-1 2020-01-1 2020-02-0 2021-01-0 2021-10-1 IDA / D1380 Post Limited 10,050.10 Completed ocial mobilization and insti g ultant Selection 1 7 5 0 6 2 0 2 9 3 tutional development in Ta mga subproject IDA-SRWSSDP-IC-TS-2020- Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-03-1 2019-12-0 2020-04-3 2020-01-1 2020-05-2 2021-01-0 2021-12-1 3 / Field technical supervis IDA / D1380 Water Supply Investments Post Limited 12,421.67 Completed ultant Selection 1 7 5 6 6 0 0 4 9 7 ion engineer for Sary-Tash subproject IDA-SRWSSDP-IC-TS-2020- Individual Cons 2019-11-0 2019-10-0 2019-11-1 2020-03-1 2019-12-0 2020-04-3 2020-01-1 2020-05-2 2021-01-0 2021-12-1 4 / Field technical supervis IDA / D1380 Water Supply Investments Post Limited 12,307.58 Completed ultant Selection 1 7 5 6 6 0 0 4 9 7 ion engineer for Achyk-Suu subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2019-11-0 2019-10-0 2019-11-1 2019-12-2 2019-12-0 2019-12-3 2020-01-1 2020-01-1 2021-01-0 2021-05-1 20-1 / Field technical super IDA / D1380 Water Supply Investments Post Limited 11,712.22 Completed ultant Selection 1 7 5 7 6 0 0 7 9 3 vision engineer for Tamga subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2019-11-0 2019-10-0 2019-11-1 2019-12-3 2019-12-0 2020-01-2 2020-01-1 2020-03-1 2021-01-0 2021-09-1 20-2 / Field technical super IDA / D1380 Water Supply Investments Post Limited 12,941.96 Completed ultant Selection 1 7 5 1 6 2 0 4 9 3 vision engineer for Ak-Bula k subproject IDA-SRWSSDP-IC-2019-2 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 955.16 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 2) IDA-SRWSSDP-IC-2019-6 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 567.12 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 6) IDA-SRWSSDP-IC-2019-1 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 955.16 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 1) IDA-SRWSSDP-IC-2019-5 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 596.98 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 5) IDA-SRWSSDP-IC-2019-4 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 363.16 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 4) IDA-SRWSSDP-IC-2019-3 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-1 2018-08-1 2019-01-2 2018-12-1 2019-02-1 2019-02-0 2019-08-1 2019-06-2 IDA / D1380 Post Limited 567.13 Completed B, CDWUU and other rural g ultant Selection 3 2 0 0 4 0 7 1 6 8 water services providers’ s taff training (# 3) IDA-SRWSSDP-IC-2019-7 / Consultant-trainers for LSG Institutional Strengthenin Individual Cons 2019-01-0 2018-07-0 2019-01-0 2018-08-1 2019-01-1 2018-12-1 2019-01-3 2019-02-0 2019-07-3 2019-06-2 IDA / D1380 Post Limited 955.16 Completed B, CDWUU and other rural g ultant Selection 3 2 7 0 4 0 1 1 0 8 water services providers’ s taff training (# 7) IDA-SRWSSDP-CS-IC-2017 Individual Cons 2017-05-1 2017-07-0 2017-07-2 2017-09-0 2018-02-2 -6 / Field technical supervi IDA / 59070 Water Supply Investments Post Open 0.00 Canceled ultant Selection 9 7 8 1 8 sion engineer in Kyrgyz At a IDA-SRWSSDP-IC-2019-31 Institutional Strengthenin Individual Cons 2019-04-1 2020-01-0 2019-04-1 2020-03-0 2019-05-0 2020-03-0 2019-06-1 2020-03-2 2022-06-0 2023-06-3 -2 / Senior Institutional De IDA / D1380 Post Limited 24,314.68 Completed g ultant Selection 2 6 7 5 8 6 2 3 8 0 velopment Advisor IDA-SRWSSDP-IC-2019-11 -1 / Consultant for rehabilit ation of indoor sanitary fac Individual Cons 2019-05-2 2019-05-0 2019-06-0 2019-06-2 2019-06-2 2019-06-1 2019-08-0 2019-07-3 2020-07-3 2020-01-1 IDA / 59070 Sanitation Development Post Limited 8,703.29 Completed ilities in schools and SES of ultant Selection 7 1 6 0 7 8 1 1 1 5 Chui and Osh oblasts with survey, preparation of BoQ and drawings. (3rd phase) IDA-SRWSSDP-IC-2019-12 -1 / Consultant for rehabilit ation of indoor sanitary fac Individual Cons 2019-05-2 2019-05-0 2019-06-0 2019-06-2 2019-06-2 2019-07-1 2019-08-0 2019-07-3 2020-07-3 2020-01-1 IDA / 59070 Sanitation Development Post Limited 9,191.97 Completed ilities in schools and SES of ultant Selection 7 1 6 0 7 9 1 1 1 5 Chui and Issyk-Kul oblasts with survey, preparation of BoQ and drawings. (3rd ph ase) IDA-SRWSSDP-IC-TS-2020- Individual Cons 2020-04-2 2020-04-0 2020-05-2 2020-05-2 2020-06-0 2020-05-2 2020-06-1 2020-06-0 2020-11-1 2021-01-0 5 / Field technical supervis IDA / D1380 Water Supply Investments Post Open 5,057.95 Completed ultant Selection 8 6 4 5 3 7 5 5 5 5 ion for extra works of Kyrg yz-Ata subproject IDA-SRWSSDP-IC-2018-28 Individual Cons 2018-05-0 2018-05-3 2018-06-1 2018-06-1 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 2019-07-0 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 9,143.60 Completed ultant Selection 1 1 9 8 0 9 4 4 4 4 n engineer in Sultan (seco nd) IDA-SRWSSDP-IC-2018-25 Individual Cons 2018-05-0 2018-04-0 2018-06-1 2018-05-2 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 2020-07-0 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 20,378.78 Completed ultant Selection 1 9 9 5 0 1 4 4 4 4 n engineer in Alekseevka IDA-SRWSSDP-IC-2018-22 Individual Cons 2018-05-0 2018-05-1 2018-06-1 2018-06-1 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 2020-01-0 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 17,519.13 Completed ultant Selection 1 4 9 9 0 9 4 4 4 5 n engineer in Kun-Tuu IDA-SRWSSDP-IC-2018-23 Individual Cons 2018-05-0 2018-05-0 2018-06-1 2018-06-1 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 2019-11-0 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 15,490.68 Completed ultant Selection 1 1 9 9 0 9 4 6 4 3 n engineer in Kyzyl-Tuu Page 7 IDA-SRWSSDP-IC-2018-10 Individual Cons 2017-12-0 2017-12-0 2018-01-1 2018-01-1 2018-02-0 2018-01-1 2018-03-1 2018-01-2 2018-10-0 2018-06-0 IDA / D1380 Sanitation Development Post Open 2,721.99 Completed / Trеiner-facilitator ultant Selection 1 1 9 6 9 6 6 5 2 6 IDA-SRWSSDP-IC-2018-9 / Individual Cons 2017-12-0 2017-12-0 2018-01-1 2018-01-1 2018-02-0 2018-01-1 2018-03-1 2018-01-2 2018-10-0 2018-06-0 IDA / D1380 Sanitation Development Post Open 2,721.99 Completed Trеiner-facilitator ultant Selection 1 1 9 6 9 6 6 5 2 6 IDA-SRWSSDP-IC-2018-8 / Individual Cons 2017-12-0 2017-12-0 2018-01-1 2018-01-1 2018-02-0 2018-01-1 2018-03-1 2018-01-2 2018-10-0 2018-06-0 IDA / D1380 Sanitation Development Post Open 2,721.99 Completed Trеiner-facilitator ultant Selection 1 1 9 6 9 6 6 5 2 6 IDA-SRWSSDP-IC-2018-18 Individual Cons 2018-05-0 2018-04-0 2018-06-1 2018-05-2 2018-07-1 2018-05-2 2018-08-1 2018-06-0 2019-08-1 2020-01-0 / Junior field technical supe IDA / D1380 Water Supply Investments Post Open 9,079.22 Completed ultant Selection 1 9 9 5 0 8 4 4 4 8 rvision engineer in Aleksee vka IDA-SRWSSDP-IC-2018-33 Individual Cons 2018-09-0 2018-05-1 2018-10-2 2018-09-2 2018-11-1 2018-09-3 2018-12-1 2018-10-0 2019-12-1 2021-01-0 / Junior field technical supe IDA / D1380 Water Supply Investments Post Open 13,230.23 Completed ultant Selection 3 4 2 4 2 0 7 9 7 8 rvision engineer in Kyzyl-T uu IDA-SRWSSDP-IC-2018-26 Individual Cons 2018-05-0 2018-05-1 2018-06-1 2018-06-1 2018-07-1 2018-06-1 2018-08-1 2018-06-2 2019-08-1 / Junior field technical supe IDA / D1380 Water Supply Investments Post Open 8,759.57 Terminated ultant Selection 1 4 9 5 0 8 4 6 4 rvision engineer in Kun-Tu u IDA-SRWSSDP-DC-2019-2 / Consultants for Author su Individual Cons 2019-06-0 2019-07-0 2019-06-1 2019-07-1 2019-07-0 2019-07-1 2019-08-0 2019-07-2 2020-02-0 2020-01-0 pervision for rehabilitation IDA / D1380 Sanitation Development Post Direct 2,492.73 Completed ultant Selection 3 1 3 2 4 9 8 5 4 8 of indoor sanitary facilities in schools and SES of Issyk -Kul oblast (2nd phase). IDA-SRWSSDP-DC-2019-1 / Consultants for Author su Individual Cons 2019-06-0 2019-07-0 2019-06-1 2019-07-1 2019-07-0 2019-07-1 2019-08-0 2019-07-2 2020-08-0 2020-01-0 pervision for rehabilitation IDA / D1380 Sanitation Development Post Direct 2,217.47 Completed ultant Selection 3 1 3 2 4 9 8 5 7 8 of indoor sanitary facilities in schools and SES of Osh and Chui oblast (2nd phas e). IDA-SRWSSDP-SSS-18-7 / 2019-06-0 2019-07-0 2019-06-1 2019-07-0 2019-08-1 2019-07-1 2020-08-1 2020-03-3 Author supervision for WS IDA / D1380 Water Supply Investments Post Direct Selection Direct 7,859.40 Completed 3 1 3 2 7 1 6 1 S sub-projects in IK oblast: Chelpek, Darkhan IDA-SRWSSDP-SSS-18-8 / 2019-06-0 2019-06-2 2019-06-2 2019-07-0 2019-08-2 2019-07-0 2020-08-2 2021-11-3 Author supervision for Kor IDA / D1380 Water Supply Investments Post Direct Selection Direct 5,459.77 Completed 3 4 0 1 4 9 3 0 ul WSS sub-project in Oshl oblast IDA-SRWSSDP-SSS-18-9 / Author supervision for Tam 2019-06-0 2019-12-0 2019-06-2 2019-11-0 2019-08-2 2020-01-1 2020-08-2 2021-05-3 IDA / D1380 Water Supply Investments Post Direct Selection Direct 15,813.46 Completed ga, Ichke Bulun WSS sub-p 3 2 0 8 4 6 3 1 rojects in Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2020-3 / Local expert on s Institutional Strengthenin Individual Cons 2019-10-0 2019-10-0 2019-11-2 2020-01-1 2019-12-1 2020-01-1 2020-01-2 2020-01-2 2021-01-1 2021-01-0 IDA / D1380 Post Open 6,347.73 Completed ocial mobilization and insti g ultant Selection 7 7 5 0 6 0 0 4 9 8 tutional development in Ic hke-Bulun subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-1 / Local expert on s Institutional Strengthenin Individual Cons 2019-10-0 2019-10-0 2019-11-2 2020-01-0 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2021-12-1 IDA / D1380 Post Open 12,641.55 Completed ocial mobilization and insti g ultant Selection 7 7 5 8 6 9 0 8 9 5 tutional development in Ko rul subproject IDA-SRWSSDP-IC-FSS-202 0-2 / Consultants on activit Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 6,135.59 Completed ies with communities and ultant Selection 7 7 5 0 6 6 0 8 9 5 householders in Achyk-Suu subproject IDA-SRWSSDP-AF-IC-FSS-2 020-5 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-1 2020-01-2 2020-01-3 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,243.60 Completed vities with communities a ultant Selection 7 7 5 0 6 3 0 1 9 5 nd householders in Ak-Bul ak subproject IDA-SRWSSDP-AF-IC-FSS-2 020-1 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,334.01 Completed vities with communities a ultant Selection 7 7 5 0 6 6 0 8 9 5 nd householders in Korul s ubproject #1 IDA-SRWSSDP-IC-FSS-202 0-1 / Consultants on activit Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,334.01 Completed ies with communities and ultant Selection 7 7 5 0 6 6 0 8 9 5 householders in Sary-Tash subproject IDA-SRWSSDP-AF-IC-FSS-2 020-2 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-0 2020-01-2 2020-01-2 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,334.01 Completed vities with communities a ultant Selection 7 7 5 0 6 6 0 8 9 5 nd householders in Korul s ubproject #2 IDA-SRWSSDP-AF-IC-FSS-2 020-6 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-2 2020-01-2 2020-02-1 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 4,881.97 Completed vities with communities a ultant Selection 7 7 5 0 6 0 0 1 9 5 nd householders in Ichke-B ulun subproject IDA-SRWSSDP-AF-IC-FSS-2 020-4 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-1 2020-01-2 2020-01-3 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 5,243.60 Completed vities with communities a ultant Selection 7 7 5 0 6 3 0 1 9 5 nd householders in Tamga subproject IDA-SRWSSDP-AF-IC-FSS-2 020-3 / Consultants on acti Individual Cons 2019-10-0 2019-10-0 2019-11-2 2019-12-3 2019-12-1 2020-01-1 2020-01-2 2020-02-1 2021-01-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 4,894.69 Completed vities with communities a ultant Selection 7 7 5 0 6 3 0 1 9 5 nd householders in Korul s ubproject #3 IDA-SRWSSDP-IC-2018-21 / Local expert on social mo Institutional Strengthenin Individual Cons 2018-05-2 2018-05-2 2018-07-0 2018-06-1 2018-07-3 2018-06-1 2018-09-0 2018-06-3 2019-09-0 2020-01-1 IDA / D1380 Post Open 10,027.78 Completed bilization and institutional g ultant Selection 1 1 9 4 0 5 3 0 3 5 development Kun-Tuu sub project IDA-SRWSSDP-IC-2018-16 / Local expert on social mo Institutional Strengthenin Individual Cons 2018-04-0 2018-04-0 2018-05-2 2018-04-3 2018-06-1 2018-05-1 2018-07-2 2018-06-0 2019-07-2 2020-01-1 IDA / D1380 Post Open 10,505.29 Completed bilization and institutional g ultant Selection 9 9 8 0 8 5 3 3 3 5 development Kyrgyz-Ata s ubproject ARIS-IDA-SRWSSDP-IC-20 18-24 / Local expert on so Institutional Strengthenin Individual Cons 2018-06-0 2018-06-0 2018-07-2 2018-06-2 2018-08-1 2018-06-2 2018-09-1 2017-06-2 2019-09-1 2019-12-3 IDA / D1380 Post Open 0.00 Completed cial mobilization and instit g ultant Selection 4 4 3 0 3 0 7 8 7 1 utional development Kura ma subproject IDA-SRWSSDP-IC-2018-19 / Local expert on social mo Institutional Strengthenin Individual Cons 2018-04-0 2018-04-0 2018-05-2 2018-05-1 2018-06-1 2018-05-2 2018-07-2 2018-06-1 2019-07-2 2020-01-1 IDA / D1380 Post Open 10,278.83 Completed bilization and institutional g ultant Selection 9 9 8 6 8 8 3 7 3 5 development Alekseevka s ubproject IDA-SRWSSDP-IC-2018-20 / Local expert on social mo Institutional Strengthenin Individual Cons 2018-04-0 2018-04-0 2018-05-2 2018-05-1 2018-06-1 2018-06-1 2018-07-2 2018-07-0 2019-07-2 2020-01-1 IDA / D1380 Post Open 9,789.36 Completed bilization and institutional g ultant Selection 9 9 8 6 8 1 3 2 3 5 development Tolok subpro ject IDA-SRWSSDP-IC-COMP2- 2020-4 / Consultant for the development of instruction Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-09-0 2020-08-1 2020-09-1 2020-09-1 2020-10-0 2021-03-1 2020-10-2 on preventing the spread IDA / D1380 Sanitation Development Post Open 712.80 Completed ultant Selection 2 5 1 1 1 5 5 5 4 5 of COVID-19 virus for a wid e range of people working with the population after q uarantine (for field activist s) IDA-SRWSSDP-IC-COMP2- 2020-5 / Consultant for the Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-07-1 2020-08-1 2020-08-1 2020-09-1 2020-09-0 2021-03-1 2020-10-0 development of informatio IDA / D1380 Sanitation Development Post Open 709.46 Completed ultant Selection 2 5 1 7 1 4 5 2 4 4 n-educational materials to prevent the spread of COV ID-19 virus in the Kyrgyz R epublic IDA-SRWSSDP-IC-COMP2- 2020-6 / Consultant for the development of designs fo Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-07-1 2020-08-1 2020-08-0 2020-09-1 2020-08-2 2021-03-1 2020-11-1 IDA / D1380 Sanitation Development Post Open 712.80 Completed r information-educational ultant Selection 2 5 1 7 1 3 5 3 4 5 materials to prevent the s pread of COVID-19 virus in the Kyrgyz Republic (first) IDA-SRWSSDP-IC-COMP2- 2020-7 / Consultant for the development of designs fo Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-08-1 2020-09-1 2021-03-1 IDA / D1380 Sanitation Development Post Open 0.00 Canceled r information-educational ultant Selection 2 5 1 1 5 4 materials to prevent the s pread of COVID-19 virus in the Kyrgyz Republic (seco nd) ARIS-IDA-SRWSSDP-SSS-1 8-8 / Preparation/revisiono Under Impleme 2020-06-0 2019-08-2 2020-06-1 2020-08-1 2021-02-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 f detailed designs for Chai ntation 2 1 2 6 2 chi WSS sub-project in Osh oblast IDA-SRWSSDP-HO-IC-2018 Institutional Strengthenin Individual Cons 2017-11-2 2017-11-3 2018-01-1 2017-12-2 2018-02-0 2017-12-2 2018-03-1 2018-01-1 2019-03-1 2019-01-1 IDA / D1380 Post Open 17,969.04 Completed -5 / Institutional specialist g ultant Selection 7 0 5 0 5 5 2 6 2 7 IDA-SRWSSDP-IC-2018-17 Individual Cons 2018-04-0 2018-04-0 2018-05-2 2018-05-2 2018-06-1 2018-05-2 2018-07-1 2018-06-1 2019-07-1 2019-08-1 / Junior field technical supe IDA / D1380 Water Supply Investments Post Open 6,274.04 Completed ultant Selection 2 9 1 5 1 8 6 2 6 4 rvision engineer in Tolok ARIS-IDA-SRWSSDP-IC-18- Individual Cons 2018-05-0 2018-04-0 2018-06-1 2018-05-2 2018-07-1 2018-06-0 2018-08-1 2018-07-0 2019-08-1 2019-01-1 IDA / D1380 Water Supply Investments Post Open 6,220.79 Completed 7 / Infrastructure engineer ultant Selection 1 9 9 5 0 4 4 3 4 7 HO 3 ARIS-IDA-SRWSSDP-IC-20 Individual Cons 2019-04-0 2019-01-2 2019-05-2 2019-04-1 2019-06-1 2019-05-0 2019-07-1 2019-05-2 2020-07-1 2020-01-1 IDA / D1380 Water Supply Investments Post Open 10,420.39 Completed 19-12 / Infrastructure engi ultant Selection 1 1 0 9 0 6 5 7 4 7 neer HO 4 ARIS-IDA-SRWSSDP-IC-20 Individual Cons 2019-04-0 2019-01-2 2019-05-2 2019-04-1 2019-06-1 2019-05-0 2019-07-1 2019-05-2 2020-07-1 2020-01-1 IDA / D1380 Water Supply Investments Post Open 7,547.97 Completed 19-11 / Infrastructure engi ultant Selection 1 1 0 9 0 6 5 7 4 7 neer HO 5 IDA-SRWSSDP-IC-2018-24 Individual Cons 2018-05-0 2018-04-0 2018-06-1 2018-05-2 2018-07-1 2018-06-1 2018-08-1 2018-07-0 2019-02-1 2019-08-1 / Field technical supervisio IDA / D1380 Water Supply Investments Post Open 9,814.16 Completed ultant Selection 1 9 9 5 0 1 4 4 0 4 n engineer in Tolok IDA-SRWSSDP-AF-IC-FSS-2 020-7 / Consultants on acti Individual Cons 2020-01-0 2020-02-0 2020-02-1 2020-05-2 2020-03-1 2020-05-2 2020-04-1 2020-06-0 2021-04-1 2021-05-0 IDA / D1380 Sanitation Development Post Open 5,186.84 Completed vities with communities a ultant Selection 1 3 9 1 1 7 5 5 5 4 nd householders in Shalta subproject IDA-SRWSSDP-AF-IC-FSS-2 020-8 / Consultants on acti Individual Cons 2020-01-0 2020-02-0 2020-02-1 2020-05-2 2020-03-1 2020-05-2 2020-04-1 2020-06-0 2021-04-1 2021-03-0 IDA / D1380 Sanitation Development Post Open 4,976.25 Completed vities with communities a ultant Selection 1 3 9 1 1 7 5 5 5 5 nd householders in Belek s ubproject IDA-SRWSSDP-AF-IC-FIDS- 2020-7 / Local expert on s Institutional Strengthenin Individual Cons 2020-01-0 2020-02-0 2020-02-1 2020-07-2 2020-03-1 2020-07-2 2020-04-1 2020-08-0 2021-04-1 IDA / D1380 Post Open 12,181.31 Signed ocial mobilization and insti g ultant Selection 1 3 9 7 1 9 5 7 5 tutional development in Sh alta subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-6 / Local expert on s Institutional Strengthenin Individual Cons 2020-01-0 2020-02-0 2020-02-1 2020-07-2 2020-03-1 2020-07-2 2020-04-1 2020-08-0 2021-04-1 IDA / D1380 Post Open 12,156.27 Signed ocial mobilization and insti g ultant Selection 1 3 9 7 1 9 5 7 5 tutional development in Be lek subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-05-0 2020-06-2 2020-06-0 2020-07-1 2020-06-1 2020-08-1 2020-07-0 2021-08-1 2021-07-0 20-5 / Field technical super IDA / D1380 Water Supply Investments Post Open 9,300.17 Completed ultant Selection 5 1 3 8 4 5 8 7 8 6 vision engineer in Shalta IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-05-0 2020-06-2 2020-06-0 2020-07-1 2020-06-1 2020-08-1 2020-06-2 2021-08-1 2021-07-0 20-6 / Field technical super IDA / D1380 Water Supply Investments Post Open 9,575.06 Completed ultant Selection 5 1 3 8 4 5 8 8 8 6 vision engineer in Belek IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-05-0 2020-06-2 2020-07-2 2020-07-1 2020-07-3 2020-08-1 2020-08-0 2021-08-1 2021-10-0 20-7 / Field technical super IDA / D1380 Water Supply Investments Post Open 10,180.60 Completed ultant Selection 5 5 3 8 4 0 8 9 8 6 vision engineer in Chon-Da ly IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-08-0 2020-06-2 2020-11-1 2020-07-1 2020-11-2 2020-08-1 2020-12-0 2021-08-1 2021-12-0 20-8 / Field technical super IDA / D1380 Water Supply Investments Post Open 8,216.10 Completed ultant Selection 5 3 3 6 4 5 8 9 8 8 vision engineer in Kenesh IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-07-0 2020-06-2 2020-08-2 2020-07-1 2020-08-2 2020-08-1 2020-09-0 2021-08-1 2021-11-0 20-9 / Field technical super IDA / D1380 Water Supply Investments Post Open 9,579.26 Completed ultant Selection 5 1 3 5 4 7 8 7 8 6 vision engineer in Kara-Do bo IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-05-0 2020-06-1 2020-06-2 2020-07-2 2020-07-1 2020-07-2 2020-08-1 2020-08-0 2021-08-1 2022-06-3 20-10 / Field technical sup IDA / D1380 Water Supply Investments Post Open 15,756.59 Completed ultant Selection 5 5 3 7 4 9 8 9 8 0 ervision engineer in Chaic hi IDA-SRWSSDP-CS-SSS-202 2020-05-1 2020-05-1 2020-05-2 2020-05-2 2020-06-0 2020-06-0 2020-12-0 2021-06-3 0-3 / Author supervision fo IDA / 59070 Water Supply Investments Post Direct Selection Direct 0.00 Completed 8 5 3 9 5 1 4 0 r Ak-Bulak WSS sub-projec t in Issyk-Kul oblast IDA-SRWSSDP-CS-SSS-202 0-1 / Author supervision fo 2020-04-0 2020-04-0 2020-04-1 2020-04-1 2020-04-2 2020-04-2 2021-02-2 2021-09-2 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Completed r Sary-Tash, Achyk-Suu WS 1 1 1 6 8 8 8 8 S sub-projects in Osh oblas t IDA-SRWSSDP-CS-SSS-202 0-2 / Author supervision fo Under Impleme 2020-05-1 2020-05-1 2020-05-2 2020-08-2 2020-06-0 2020-10-0 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 r extra works Kyrgyz-Ata ntation 8 5 3 7 5 3 WSS sub-project in Osh obl ast IDA-SRWSSDP-SSS-COMP3 -2020-1 / Company for revi Institutional Strengthenin 2020-06-1 2020-09-0 2020-06-2 2020-01-1 2020-09-0 2020-01-1 2021-09-0 2022-12-3 ew and Improvement of D IDA / D1380 Post Direct Selection Direct 0.00 Completed g 8 3 8 7 1 9 1 1 esign and Construction Sta ndards and Regulations for Water Supply and Sanitati on Sector Page 8 IDA-SRWSSDP-SIASAR-SS S-2020-2 / Server Support Consultant for the Depart Institutional Strengthenin 2020-06-1 2020-06-1 2020-06-2 2020-06-1 2020-08-1 2020-09-0 2021-03-0 2020-12-2 ment of Development of D IDA / D1380 Post Direct Selection Direct 0.00 Completed g 8 9 8 9 1 1 9 8 rinking Water Supply and Wastewater Disposal of St ate Water Resources Agen cy under the Government of Kyrgyz Republic IDA-SRWSSDP-IC-FIDS-20 20-7 / Local expert in socia Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2020-07-0 IDA / D1380 Post Direct Selection Direct 3,083.76 Completed l mobilization and instituti g 3 3 2 7 7 8 7 6 onal development sub-proj ect Sultan IDA-SRWSSDP-IC-FIDS-20 20-4 / Local expert in socia Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2020-07-0 IDA / D1380 Post Direct Selection Direct 3,083.76 Completed l mobilization and instituti g 3 3 2 7 7 8 7 6 onal development under t he project in kun-Tuu IDA-SRWSSDP-IC-TS-2020- 2019-12-2 2019-12-3 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2021-11-3 2 / Field technical supervis IDA / D1380 Water Supply Investments Post Direct Selection Direct 14,376.10 Completed 3 1 2 5 7 8 7 0 ion engineer Korul ARIS-IDA-SRWSSDP-HO-19 Institutional Strengthenin 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-0 2020-03-0 2020-01-0 IDA / D1380 Post Direct Selection Direct 19,863.82 Completed -10 / Institutional specialist g 3 4 2 7 8 8 7 8 IDA-SRWSSDP-IC-2020-3 / Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2024-02-2 IDA / D1380 Post Direct Selection Direct 34,786.48 Completed Institutional specialist g 3 3 2 6 7 8 7 9 IDA-SRWSSDP-HO-IC-18-6 2017-12-2 2017-12-2 2018-01-0 2017-12-2 2018-03-0 2018-01-0 2019-03-0 2019-01-0 IDA / D1380 Sanitation Development Post Direct Selection Direct 17,082.54 Completed / Sanitation and hygene sp 3 5 2 6 8 7 8 8 ecialist ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-0 2020-03-0 2020-01-0 IDA / D1380 Sanitation Development Post Direct Selection Direct 20,824.36 Completed -11 / Sanitation and hygen 3 4 2 6 8 8 7 8 e specialist IDA-SRWSSDP-IC-2020-4 / 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2023-07-3 IDA / D1380 Sanitation Development Post Direct Selection Direct 36,731.93 Completed Sanitation and hygene spe 3 3 2 7 7 8 7 1 cialist IDA-SRWSSDP-IC-FIDS-20 20-10 / Local expert on so Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-02-1 2020-01-0 2021-02-1 2020-07-0 IDA / D1380 Post Direct Selection Direct 2,843.36 Completed cial mobilization and instit g 3 3 2 7 1 8 0 6 utional development in Ch elpek subproject IDA-SRWSSDP-AF-IC-2020 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2021-01-0 IDA / D1380 Water Supply Investments Post Direct Selection Direct 12,144.79 Completed -1 / Infrastructure engineer 3 3 2 5 7 8 7 8 HO 5 ARIS-IDA-SRWSSDP-IC-HO 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-0 2021-03-0 2020-12-3 -AF-2020-13 / Infrastructur IDA / D1380 Water Supply Investments Post Direct Selection Direct 12,831.68 Completed 3 3 2 6 7 8 7 1 e engineer HO 4 IDA-SRWSSDP-AF-IC-2020 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 -6 / Consultant on promoti IDA / D1380 Sanitation Development Post Direct Selection Direct 26,518.06 Signed 3 3 2 7 7 7 7 ng WASH in schools and IS H in communities IDA-SRWSSDP-IC-2020-8 / 2019-12-2 2020-01-0 2020-03-0 2021-03-0 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Canceled Electrical and mechanical 3 2 7 7 engineer IDA-SRWSSDP-IC-FIDS-20 20-3 / Local expert on soci Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-01-1 IDA / D1380 Post Direct Selection Direct 6,881.40 Completed al mobilization and institut g 3 3 2 7 7 7 7 7 ional development Kun-Tu u subproject IDA-SRWSSDP-IC-FIDS-20 20-6 / Local expert on soci Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2020-07-1 IDA / D1380 Post Direct Selection Direct 3,083.76 Completed al mobilization and institut g 3 3 2 7 7 7 7 3 ional development Tolok s ubproject IDA-SRWSSDP-IC-FIDS-20 20-5 / Local expert on soci Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2020-10-1 IDA / D1380 Post Direct Selection Direct 5,233.52 Completed al mobilization and institut g 3 3 2 7 7 7 7 3 ional development Aleksee vka IDA-SRWSSDP-IC-FIDS-20 20-11 / Local expert on so Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-01-1 IDA / D1380 Post Direct Selection Direct 6,894.55 Completed cial mobilization and instit g 3 3 2 7 7 7 7 7 utional development in Da rkan subproject IDA-SRWSSDP-IC-2020-9 / 2019-12-2 2019-12-2 2020-01-0 2020-03-0 2021-03-0 IDA / D1380 Water Supply Investments Post Direct Selection Direct 0.00 Under Review Supervision Engineer/Hydr 3 3 2 7 7 ogeologist IDA-SRWSSDP-IC-FIDS-20 2O-8 / Local expert in soci Institutional Strengthenin Under Impleme 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2021-03-0 IDA / D1380 Post Direct Selection Direct 0.00 al mobilization and institut g ntation 3 3 2 6 7 7 ional development sub-pro ject Sultan IDA-SRWSSDP-HO-IC-18-8 2017-12-2 2017-12-2 2018-01-0 2017-12-2 2018-03-0 2018-01-1 2019-03-0 2019-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 18,425.07 Completed / Infrastructure engineer 3 5 2 6 8 6 8 7 ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 18,177.15 Completed -7 / Infrastructure engineer 3 4 2 5 8 7 7 7 ARIS-IDA-SRWSSDP-HO-20 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 11,881.19 Completed 20-8 / Infrastructure engin 3 3 2 6 7 7 7 7 eer ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 17,252.28 Completed -9 / Infrastructure engineer 3 4 2 6 8 7 7 7 HO 3 ARIS-IDA-SRWSSDP-HO-20 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 10,100.73 Completed 20-7 / Infrastructure engin 3 3 2 5 7 7 7 7 eer HO 3 IDA-SRWSSDP-IC-FIDS-20 20-12 / Local expert in soci Institutional Strengthenin 2019-12-2 2019-12-3 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2020-07-1 IDA / D1380 Post Direct Selection Direct 3,576.74 Completed al mobilization and institut g 3 1 2 7 7 7 7 3 ional development sub-pro ject Kyrgyz-Ata IDA-SRWSSDP-IC-2018-7 / Individual Cons 2017-12-2 2018-01-0 2018-02-1 2018-01-1 2018-03-0 2018-02-2 2018-04-0 2018-02-0 2019-04-0 2018-03-1 IDA / D1380 Water Supply Investments Post Open 4,419.96 Completed Infrastructure engineer ass ultant Selection 3 8 0 7 3 6 7 4 7 6 istant ARIS-IDA-SRWSSDP-IC-20 2017-12-2 2018-02-0 2018-01-0 2018-02-1 2018-03-0 2018-03-1 2019-03-0 2019-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 11,049.90 Completed 18-13 / Infrastructure engi 3 5 2 9 8 6 8 7 neer assistant ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 12,559.95 Completed -8 / Infrastructure engineer 3 4 2 5 8 7 7 7 assistant IDA-SRWSSDP-IC-2020-2 / 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2021-12-3 IDA / D1380 Water Supply Investments Post Direct Selection Direct 17,115.06 Completed Infrastructure engineer ass 3 3 2 6 7 7 7 1 istant ARIS-IDA-SRWSSDP-HO-20 Individual Cons 2017-12-2 2018-01-0 2018-02-1 2018-03-0 2018-04-0 2019-04-0 IDA / D1380 Water Supply Investments Post Open 0.00 Canceled 18-14 / Assistant of safegu ultant Selection 3 1 0 3 7 7 ards specialist ARIS-IDA-SRWSSDP-HO-19 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Water Supply Investments Post Direct Selection Direct 5,443.94 Completed -5 / Assistant of safeguard 3 4 2 5 8 7 7 7 s specialist IDA-SRWSSDP-IC-2020-5 / 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2022-06-3 IDA / D1380 Water Supply Investments Post Direct Selection Direct 14,680.58 Completed Assistant of safeguards sp 3 3 2 7 7 7 7 0 ecialist IDA-SRWSSDP-IC-2020-7 / Sector Monitoring Specialis Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-3 2020-03-0 2020-01-1 2021-03-0 t for development and imp IDA / D1380 Post Direct Selection Direct 25,342.72 Signed g 3 3 2 0 7 7 7 lementation of Information System for Rural Water Su pply and Sanitation (SIASA R) IDA-SRWSSDP-IC-2020-12 / Web Developer Specialist Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 IDA / D1380 Post Direct Selection Direct 31,207.05 Signed Information System for Rur g 3 3 2 7 7 7 7 al Water Supply and Sanit ation (SIASAR) IDA-SRWSSDP-IC-FIDS-20 20-8 / Local expert in socia Institutional Strengthenin 2019-12-2 2019-12-2 2020-01-0 2019-12-2 2020-03-0 2020-01-1 2021-03-0 2020-07-1 IDA / D1380 Post Direct Selection Direct 3,136.19 Completed l mobilization and instituti g 3 3 2 5 7 5 7 2 onal development sub-proj ect Sultan IDA-SRWSSDP-IC-2O19-12 / Web Developer Specialist Institutional Strengthenin 2018-12-2 2018-12-2 2019-01-0 2018-12-2 2019-03-0 2019-01-1 2020-03-0 2020-01-1 IDA / D1380 Post Direct Selection Direct 13,728.66 Completed Information System for Rur g 3 7 2 8 8 5 7 5 al Water Supply and Sanit ation (SIASAR) IDA-SRWSSDP-AF-IC-FSS-2 020-9 / Consultants on acti Individual Cons 2020-03-0 2020-06-0 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-05-1 IDA / 59070 Sanitation Development Post Open 4,251.63 Completed vities with communities an ultant Selection 1 8 9 7 0 0 4 7 4 4 d householders in Chon-Da ly subproject IDA-SRWSSDP-AF-IC-FSS-2 020-10 / Consultants on ac Individual Cons 2020-03-0 2020-06-2 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-05-1 IDA / 59070 Sanitation Development Post Open 4,251.62 Completed tivities with communities a ultant Selection 1 9 9 8 0 0 4 7 4 4 nd householders in Chaichi subproject IDA-SRWSSDP-AF-IC-FSS-2 020-11 / Consultants on ac Individual Cons 2020-03-0 2020-06-0 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-03-1 IDA / 59070 Sanitation Development Post Open 4,251.63 Completed tivities with communities a ultant Selection 1 8 9 7 0 0 4 7 4 7 nd householders in Kenesh subproject IDA-SRWSSDP-AF-IC-FSS-2 020-12 / Consultants on ac Individual Cons 2020-03-0 2020-06-0 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-05-1 IDA / 59070 Sanitation Development Post Open 4,251.63 Completed tivities with communities a ultant Selection 1 8 9 7 0 0 4 7 4 4 nd householders in Kara-D obo subproject IDA-SRWSSDP-AF-IC-FSS-2 020-13 / Consultants on ac Individual Cons 2020-03-0 2021-03-2 2020-04-1 2021-06-2 2020-05-1 2021-06-3 2020-06-1 2021-07-1 2021-06-1 IDA / D2040 Sanitation Development Post Open 4,243.92 Signed tivities with communities a ultant Selection 1 1 9 8 0 0 4 5 4 nd householders in Kenesh subproject Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 020-14 / Consultants on ac Individual Cons 2020-03-0 2021-03-2 2020-04-1 2021-06-2 2020-05-1 2021-06-3 2020-06-1 2021-07-1 2021-06-1 2022-03-3 IDA / 59070 Sanitation Development Post Open 4,243.92 Completed tivities with communities a ultant Selection 1 1 9 8 0 0 4 5 4 1 nd householders in Por sub project IDA-SRWSSDP-AF-IC-FIDS- 2020-8 / Local expert on s Institutional Strengthenin Individual Cons 2020-03-0 2020-06-2 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2021-01-1 IDA / 59070 Post Open 2,357.87 Completed ocial mobilization and insti g ultant Selection 1 2 9 7 0 1 4 7 4 7 tutional development in Ch on-Daly subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-9 / Local expert on s Institutional Strengthenin Individual Cons 2020-03-0 2020-06-2 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2022-01-1 IDA / 59070 Post Open 5,187.32 Completed ocial mobilization and insti g ultant Selection 1 2 9 7 0 1 4 7 4 7 tutional development in Ch aichi subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-10 / Local expert on Institutional Strengthenin Individual Cons 2020-03-0 2020-06-2 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2022-02-0 IDA / 59070 Post Open 8,423.40 Completed social mobilization and inst g ultant Selection 1 2 9 7 0 1 4 7 4 3 itutional development in K enesh subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-11 / Local expert on Institutional Strengthenin Individual Cons 2020-03-0 2020-03-0 2020-04-1 2020-07-2 2020-05-1 2020-07-3 2020-06-1 2020-08-1 2021-06-1 2022-12-3 IDA / 59070 Post Open 11,978.28 Completed social mobilization and inst g ultant Selection 1 9 9 9 0 1 4 7 4 1 itutional development in K ara-Dobo subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-12 / Local expert on Institutional Strengthenin Individual Cons 2020-03-0 2021-03-0 2020-04-1 2021-04-2 2020-05-1 2021-04-2 2020-06-1 2021-05-1 2021-06-1 2022-06-3 IDA / 59070 Post Open 6,601.92 Completed social mobilization and inst g ultant Selection 1 1 9 0 0 6 4 4 4 0 itutional development in K enesh subproject Osh obla st IDA-SRWSSDP-AF-IC-FIDS- 2020-13 / Local expert on Institutional Strengthenin Individual Cons 2020-03-0 2021-03-0 2020-04-1 2021-05-2 2020-05-1 2021-06-0 2020-06-1 2021-06-2 2021-06-1 2023-06-3 IDA / 59070 Post Open 6,044.60 Completed social mobilization and inst g ultant Selection 1 1 9 0 0 3 4 1 4 0 itutional development in P or subproject IDA-SRWSSDP-SIASAR-SS S-2020-1 / Programmer Co nsultant for the Departme Institutional Strengthenin 2020-06-1 2020-06-1 2020-06-2 2020-08-1 2020-11-0 nt of Development of Drin IDA / D1380 Post Direct Selection Direct 0.00 Canceled g 8 9 8 1 9 king Water Supply and Wa stewater Disposal of State Water Resources Agency u nder the Government of K yrgyz Republic IDA-SRWSSDP-SIASAR-SS S-2020-1/2 / Programmer Consultant for the Depart Institutional Strengthenin 2020-11-0 2020-11-0 2020-11-1 2020-11-0 2021-01-0 2020-11-2 2021-04-0 2020-11-1 ment of Development of D IDA / D1380 Post Direct Selection Direct 2,475.87 Completed g 9 8 9 9 2 4 2 2 rinking Water Supply and Wastewater Disposal of St ate Water Resources Agen cy under the Government of Kyrgyz Republic IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-03-0 2021-03-2 2021-04-1 2021-06-2 2021-05-1 2021-06-2 2021-06-1 2021-07-1 2022-06-1 21-1 / Field technical super IDA / 60880 Water Supply Investments Post Open 8,204.92 Signed ultant Selection 1 1 9 8 0 9 4 5 4 vision engineer in Kara-Jig ach Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-03-1 2023-03-3 2022-05-0 2023-05-1 2022-05-2 2023-05-1 2022-06-2 2023-05-2 2023-06-2 22-1 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 5 1 3 1 4 8 8 5 8 vision engineer in Kayrma Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Pending Imple 2022-03-1 2022-05-0 2022-05-2 2022-06-2 2023-06-2 22-2 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 ultant Selection mentation 5 3 4 8 8 vision engineer in Vasilev Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Pending Imple 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2023-02-1 21-2 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 ultant Selection mentation 1 0 0 4 4 vision engineer in Komsom olskoe Chui oblast Page 9 IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2023-03-3 2021-12-2 2023-11-1 2022-01-1 2023-11-1 2022-02-1 2023-02-1 21-3 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 1 0 0 0 0 4 4 vision engineer in Bokso-Jo l Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-02-2 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-05-1 2023-02-1 2022-12-3 21-4 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 1 0 9 0 5 4 1 4 1 vision engineer in Sosnovk a Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-03-0 2021-03-2 2021-04-1 2021-07-2 2021-05-1 2021-07-2 2021-06-1 2021-08-1 2022-06-1 21-5 / Field technical super IDA / 60880 Water Supply Investments Post Open 7,521.18 Signed ultant Selection 1 9 9 6 0 8 4 1 4 vision engineer in Ivanovk a station Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-03-1 2023-03-3 2022-05-0 2023-05-1 2022-05-2 2023-05-1 2022-06-2 2023-05-1 2023-06-2 22-3 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 5 1 3 1 4 8 8 8 8 vision engineer in Kurpuld ok Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Under Impleme 2022-03-1 2023-03-3 2022-05-0 2022-05-2 2022-06-2 2023-06-2 22-4 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 ultant Selection ntation 5 1 3 4 8 8 vision engineer in Kum-Ary k Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-03-1 2023-03-3 2022-05-0 2023-05-1 2022-05-2 2023-05-1 2022-06-2 2023-05-1 2023-06-2 22-5 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 5 1 3 1 4 8 8 8 8 vision engineer in Orto-Ary k Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-02-0 2021-12-2 2022-02-1 2022-01-1 2022-02-2 2022-02-1 2022-03-1 2023-02-1 2023-12-3 21-6 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 7 0 7 0 3 4 7 4 1 vision engineer in Kaindy Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2021-05-2 2021-12-2 2021-11-1 2022-01-1 2021-11-2 2022-02-1 2021-12-0 2023-02-1 21-7 / Field technical super IDA / 60880 Water Supply Investments Post Open 4,786.20 Signed ultant Selection 1 6 0 6 0 5 4 5 4 vision engineer in Boroldoi Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2023-04-0 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-1 2022-03-2 21-8 / Field technical super IDA / 60880 Water Supply Investments Post Open 1,827.70 Signed ultant Selection 1 6 0 7 0 9 4 4 2 vision engineer in Buloluu Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2023-02-1 21-9 / Field technical super IDA / 60880 Water Supply Investments Post Open 0.00 Canceled ultant Selection 1 0 0 4 4 vision engineer in Toloikon Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-1 2023-02-1 21-10 / Field technical sup IDA / 60880 Water Supply Investments Post Open 1,827.70 Signed ultant Selection 1 7 0 7 0 9 4 3 4 ervision engineer in Erkin- Too Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2023-03-3 2021-12-2 2023-05-0 2022-01-1 2023-05-1 2022-02-1 2023-05-1 2023-02-1 2023-06-3 21-11 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 1 0 3 0 1 4 1 4 0 ervision engineer in Kyzyl- Bairak Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-03-0 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-05-0 2023-02-1 21-12 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 1 0 9 0 5 4 6 4 ervision engineer in Kabyk Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-10-1 2022-01-1 2022-10-2 2022-02-1 2022-11-1 2023-02-1 2023-10-3 21-13 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Completed ultant Selection 1 7 0 9 0 4 4 6 4 1 ervision engineer in Enchil esh Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Pending Imple 2021-08-0 2021-09-1 2021-10-1 2021-11-1 2022-11-1 21-14 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 ultant Selection mentation 1 9 0 4 4 ervision engineer in Jeti-Og uz Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-08-0 2021-03-0 2021-09-1 2021-05-2 2021-10-1 2021-05-2 2021-11-1 2021-06-1 2022-11-1 21-15 / Field technical sup IDA / 60880 Water Supply Investments Post Open 8,888.81 Signed ultant Selection 1 2 9 6 0 8 4 1 4 ervision engineer in Boz-B eshik Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2022-04-2 2021-12-2 2022-06-2 2022-01-1 2022-07-0 2022-02-1 2022-07-1 2023-02-1 21-16 / Field technical sup IDA / 60880 Water Supply Investments Post Open 729.05 Signed ultant Selection 1 6 0 9 0 1 4 3 4 ervision engineer in Barbul ak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-11-0 2023-07-1 2021-12-2 2023-11-1 2022-01-1 2023-11-2 2022-02-1 2023-11-2 2023-02-1 21-17 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 0 0 0 0 0 4 3 4 ervision engineer in Kurmo ntu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-09-0 2023-09-1 2021-10-2 2023-11-1 2021-11-1 2023-11-2 2021-12-1 2022-12-1 21-18 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 8 0 0 0 1 5 5 ervision engineer in Kichi- Oruktuu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-09-0 2023-03-3 2021-10-2 2023-05-0 2021-11-1 2023-05-0 2021-12-1 2023-05-0 2022-12-1 21-19 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 1 0 2 0 3 5 3 5 ervision engineer in Jyluu- Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-06-0 2021-07-2 2021-08-1 2021-09-1 2022-09-1 21-20 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 Canceled ultant Selection 1 0 0 4 4 ervision engineer in Grigor evka Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Pending Imple 2021-06-0 2021-07-2 2021-08-1 2021-09-1 2022-09-1 21-21 / Field technical sup IDA / 60880 Water Supply Investments Post Open 0.00 ultant Selection mentation 1 0 0 4 4 ervision engineer in Karool -Dobo Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-08-1 2020-08-1 2020-09-2 2020-12-2 2020-10-1 2020-12-2 2020-11-2 2021-01-0 2021-11-2 20-11 / Field technical sup IDA / 60880 Water Supply Investments Post Open 13,172.42 Signed ultant Selection 0 0 8 1 9 5 3 6 3 ervision engineer in Gorna ya Maevka Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-01-1 2021-03-2 2021-02-2 2021-02-2 2021-03-2 2021-02-2 2021-04-2 2021-03-0 2022-04-2 21-22 / Field technical sup IDA / 60880 Water Supply Investments Post Open 10,940.10 Signed ultant Selection 0 9 8 4 1 5 5 6 5 ervision engineer in Beishe ke Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-02-1 2021-03-0 2021-03-3 2021-05-2 2021-04-2 2021-05-2 2021-05-2 2021-06-1 2022-05-2 2022-01-1 21-23 / Field technical sup IDA / 60880 Water Supply Investments Post Open 4,786.35 Completed ultant Selection 0 2 1 4 1 8 6 1 6 2 ervision engineer in Ken-B ulun Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-1 / Consultants on acti Individual Cons 2021-03-0 2021-03-2 2021-04-1 2021-04-2 2021-05-1 2021-04-2 2021-06-1 2021-05-1 2022-03-1 2022-01-3 IDA / 60880 Sanitation Development Post Open 6,183.07 Completed vities with communities an ultant Selection 1 1 9 7 0 9 4 0 5 1 d householders in Kara-Jig ach Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-1 / Consultants on acti Individual Cons 2022-03-1 2023-03-0 2022-05-0 2023-06-1 2022-05-2 2023-06-1 2022-06-2 2023-06-1 2023-03-2 2024-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 5 6 3 2 4 9 8 9 9 0 d householders in Kayrma Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-2 / Consultants on acti Individual Cons Pending Imple 2022-03-1 2022-05-0 2022-05-2 2022-06-2 2023-03-2 IDA / 60880 Sanitation Development Post Open 0.00 vities with communities an ultant Selection mentation 5 3 4 8 9 d householders in Vasilev Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-2 / Consultants on acti Individual Cons Pending Imple 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2022-11-1 IDA / 60880 Sanitation Development Post Open 0.00 vities with communities an ultant Selection mentation 1 0 0 4 5 d householders in Komsom olskoe Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-3 / Consultants on acti Individual Cons 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2022-11-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled vities with communities an ultant Selection 1 0 0 4 5 d householders in Bokso-Jo l Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-4 / Consultants on acti Individual Cons 2021-11-0 2022-02-1 2021-12-2 2022-04-2 2022-01-1 2022-04-2 2022-02-1 2022-05-0 2022-11-1 IDA / 60880 Sanitation Development Post Open 0.00 Signed vities with communities an ultant Selection 1 8 0 0 0 5 4 5 5 d householders in Sosnovk a Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-5 / Consultants on acti Individual Cons 2021-03-0 2021-03-2 2021-04-1 2021-04-2 2021-05-1 2021-04-2 2021-06-1 2021-05-1 2022-03-1 2022-01-1 IDA / 60880 Sanitation Development Post Open 4,244.22 Completed vities with communities an ultant Selection 1 1 9 7 0 9 4 4 5 7 d householders in Ivanovk a station Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-3 / Consultants on acti Individual Cons 2022-03-1 2023-03-0 2022-05-0 2023-06-2 2022-05-2 2023-06-2 2022-06-2 2023-06-3 2023-03-2 IDA / 60880 Sanitation Development Post Open 0.00 Signed vities with communities an ultant Selection 5 6 3 2 4 2 8 0 9 d householders in Kurpuld ok Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-4 / Consultants on acti Individual Cons 2022-03-1 2022-05-0 2022-05-2 2022-06-2 2023-03-2 IDA / 60880 Sanitation Development Post Open 0.00 Canceled vities with communities an ultant Selection 5 3 4 8 9 d householders in Kum-Ary k Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 022-5 / Consultants on acti Individual Cons 2022-03-1 2023-03-0 2022-05-0 2023-06-2 2022-05-2 2023-06-2 2022-06-2 2023-06-3 2023-03-2 IDA / 60880 Sanitation Development Post Open 0.00 Signed vities with communities an ultant Selection 5 6 3 2 4 7 8 0 9 d householders in Orto-Ary k Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-6 / Consultants on acti Individual Cons 2021-11-0 2022-02-2 2021-12-2 2022-04-2 2022-01-1 2022-04-2 2022-02-1 2022-05-1 2022-11-1 2023-03-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 1 1 0 0 0 5 4 5 5 1 d householders in Kaindy Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-7 / Consultants on acti Individual Cons 2021-11-0 2021-06-0 2021-12-2 2021-08-2 2022-01-1 2021-08-2 2022-02-1 2021-09-0 2022-11-1 IDA / 60880 Sanitation Development Post Open 4,244.01 Signed vities with communities an ultant Selection 1 1 0 5 0 5 4 5 5 d householders in Boroldoi Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-8 / Consultants on acti Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-2 2022-11-1 IDA / 60880 Sanitation Development Post Open 1,267.09 Signed vities with communities an ultant Selection 1 7 0 7 0 9 4 2 5 d householders in Buloluu Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-9 / Consultants on acti Individual Cons 2021-11-0 2023-03-0 2021-12-2 2023-06-1 2022-01-1 2023-06-1 2022-02-1 2022-11-1 2024-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed vities with communities an ultant Selection 1 6 0 2 0 9 4 5 0 d householders in Toloikon Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-10 / Consultants on ac Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-1 2022-11-1 IDA / 60880 Sanitation Development Post Open 1,260.48 Signed tivities with communities a ultant Selection 1 7 0 7 0 9 4 3 5 nd householders in Erkin-T oo Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-11 / Consultants on ac Individual Cons 2021-11-0 2023-03-0 2021-12-2 2023-06-1 2022-01-1 2023-06-1 2022-02-1 2022-11-1 2024-04-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed tivities with communities a ultant Selection 1 6 0 2 0 9 4 5 0 nd householders in Kyzyl-B airak Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-12 / Consultants on ac Individual Cons 2021-11-0 2022-03-0 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-05-0 2022-11-1 2022-12-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed tivities with communities a ultant Selection 1 1 0 5 0 5 4 5 5 0 nd householders in Kabyk Osh oblast IDA-SRWSSDP-AF-IC-FSS-2 021-13 / Consultants on ac Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-09-3 2022-01-1 2022-10-0 2022-02-1 2022-10-2 2022-11-1 IDA / 60880 Sanitation Development Post Open 0.00 Signed tivities with communities a ultant Selection 1 7 0 0 0 5 4 0 5 nd householders in Enchile sh Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-14 / Consultants on ac Individual Cons 2021-08-0 2021-03-2 2021-09-1 2021-05-3 2021-10-1 2021-06-0 2021-11-1 2021-06-1 2022-08-1 2022-03-0 IDA / 60880 Sanitation Development Post Open 4,158.27 Completed tivities with communities a ultant Selection 1 1 9 1 0 3 4 1 5 5 nd householders in Jeti-Og uz Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-15 / Consultants on ac Individual Cons 2021-08-0 2021-03-2 2021-09-1 2021-05-3 2021-10-1 2021-06-0 2021-11-1 2021-06-2 2022-08-1 2022-03-1 IDA / 60880 Sanitation Development Post Open 4,158.27 Completed tivities with communities a ultant Selection 1 1 9 1 0 3 4 1 5 6 nd householders in Boz-Be shik Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-16 / Consultants on ac Individual Cons 2021-11-0 2022-04-2 2021-12-2 2022-06-0 2022-01-1 2022-06-0 2022-02-1 2022-06-1 2022-11-1 IDA / 60880 Sanitation Development Post Open 3,360.56 Signed tivities with communities a ultant Selection 1 6 0 6 0 6 4 1 5 nd householders in Barbul ak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-17 / Consultants on ac Individual Cons 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2022-11-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled tivities with communities a ultant Selection 1 0 0 4 5 nd householders in Kurmo ntu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-18 / Consultants on ac Individual Cons 2021-09-0 2021-10-2 2021-11-1 2021-12-1 2022-09-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled tivities with communities a ultant Selection 1 0 0 5 5 nd householders in Kichi-O ruktuu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-19 / Consultants on ac Individual Cons 2021-09-0 2022-06-2 2021-10-2 2022-09-3 2021-11-1 2022-10-0 2021-12-1 2022-10-1 2022-09-1 2023-06-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed tivities with communities a ultant Selection 1 7 0 0 0 5 5 9 5 0 nd householders in Jyluu-B ulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-20 / Consultants on ac Individual Cons 2021-06-0 2023-03-0 2021-07-2 2023-06-2 2021-08-1 2023-06-2 2021-09-1 2023-06-3 2022-06-1 IDA / 60880 Sanitation Development Post Open 0.00 Signed tivities with communities a ultant Selection 1 6 0 7 0 9 4 0 5 nd householders in Grigore vka Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 021-21 / Consultants on ac Individual Cons 2021-06-0 2021-07-2 2021-08-1 2021-09-1 2022-06-1 IDA / 60880 Sanitation Development Post Open 0.00 Canceled tivities with communities a ultant Selection 1 0 0 4 5 nd householders in Karool- Dobo Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 020-15 / Consultants on ac Individual Cons 2020-08-1 2021-03-2 2020-09-2 2021-04-2 2020-10-1 2021-04-2 2020-11-2 2021-05-1 2021-08-2 2022-01-3 IDA / 60880 Sanitation Development Post Open 6,167.20 Completed tivities with communities a ultant Selection 0 9 8 7 9 9 3 4 4 1 nd householders in Gornay a Maevka Chui oblast IDA-SRWSSDP-AF-IC-FSS-2 021-22 / Consultants on ac Individual Cons 2021-01-1 2021-03-2 2021-02-2 2021-04-2 2021-03-2 2021-04-2 2021-04-2 2021-05-0 2022-01-2 2022-02-0 IDA / 60880 Sanitation Development Post Open 4,244.12 Completed tivities with communities a ultant Selection 0 1 8 7 1 9 5 4 4 5 nd householders in Beishe ke Chui oblast Page 10 IDA-SRWSSDP-AF-IC-FSS-2 021-23 / Consultants on ac Individual Cons 2021-02-1 2021-03-2 2021-03-3 2021-04-2 2021-04-2 2021-04-2 2021-05-2 2021-05-1 2022-02-2 IDA / 60880 Sanitation Development Post Open 2,692.96 Signed tivities with communities a ultant Selection 0 1 1 7 1 9 6 4 4 nd householders in Ken-Bu lun Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-1 / Local expert on s Institutional Strengthenin Individual Cons 2021-03-0 2021-03-0 2021-04-1 2021-04-2 2021-05-1 2021-04-2 2021-06-1 2021-05-0 2022-06-1 IDA / 60880 Post Open 6,601.92 Signed ocial mobilization and insti g ultant Selection 1 1 9 0 0 6 4 5 4 tutional development in Ka ra-Jigach Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-1 / Local expert on s Institutional Strengthenin Individual Cons 2022-03-1 2023-03-1 2022-05-0 2023-07-3 2022-05-2 2023-07-3 2022-06-2 2023-09-1 2023-06-2 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 5 3 3 1 4 1 8 8 8 tutional development in Ka yrma Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-2 / Local expert on s Institutional Strengthenin Individual Cons Pending Imple 2022-03-1 2022-05-0 2022-05-2 2022-06-2 2023-06-2 IDA / 60880 Post Open 0.00 ocial mobilization and insti g ultant Selection mentation 5 3 4 8 8 tutional development in Va silev Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-2 / Local expert on s Institutional Strengthenin Individual Cons Pending Imple 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2023-02-1 IDA / 60880 Post Open 0.00 ocial mobilization and insti g ultant Selection mentation 1 0 0 4 4 tutional development in Ko msomolskoe Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-3 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2023-08-2 2021-12-2 2023-11-1 2022-01-1 2023-11-1 2022-02-1 2023-11-2 2023-02-1 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 1 4 0 0 0 0 4 7 4 tutional development in Bo kso-Jol Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-4 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2022-02-1 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-05-0 2023-02-1 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 1 8 0 8 0 5 4 5 4 tutional development in So snovka Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-5 / Local expert on s Institutional Strengthenin Individual Cons 2021-03-0 2021-03-0 2021-04-1 2021-04-1 2021-05-1 2021-04-1 2021-06-1 2021-05-0 2022-06-1 IDA / 60880 Post Open 6,826.51 Signed ocial mobilization and insti g ultant Selection 1 1 9 6 0 9 4 3 4 tutional development in Iv anovka station Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-3 / Local expert on s Institutional Strengthenin Individual Cons 2022-03-1 2023-03-1 2022-05-0 2023-06-0 2022-05-2 2023-06-0 2022-06-2 2023-06-1 2023-06-2 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 5 3 3 6 4 7 8 4 8 tutional development in Ku rpuldok Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-4 / Local expert on s Institutional Strengthenin Individual Cons Pending Imple 2022-03-1 2022-05-0 2022-05-2 2022-06-2 2023-06-2 IDA / 60880 Post Open 0.00 ocial mobilization and insti g ultant Selection mentation 5 3 4 8 8 tutional development in Ku m-Aryk Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2022-5 / Local expert on s Institutional Strengthenin Individual Cons 2022-03-1 2023-03-1 2022-05-0 2023-06-0 2022-05-2 2023-06-0 2022-06-2 2023-06-1 2023-06-2 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 5 3 3 6 4 7 8 4 8 tutional development in Or to-Aryk Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-6 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2022-01-0 2021-12-2 2022-03-2 2022-01-1 2022-03-3 2022-02-1 2022-04-0 2023-02-1 2023-12-3 IDA / 60880 Post Open 0.00 Completed ocial mobilization and insti g ultant Selection 1 5 0 9 0 1 4 9 4 1 tutional development in Ka indy Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-7 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2021-05-2 2021-12-2 2021-08-2 2022-01-1 2021-08-2 2022-02-1 2021-09-1 2023-02-1 IDA / 60880 Post Open 2,263.50 Signed ocial mobilization and insti g ultant Selection 1 4 0 7 0 7 4 1 4 tutional development in Bo roldoi Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-8 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-1 2023-02-1 IDA / 60880 Post Open 1,267.09 Signed ocial mobilization and insti g ultant Selection 1 7 0 7 0 9 4 4 4 tutional development in Bu loluu Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-9 / Local expert on s Institutional Strengthenin Individual Cons 2021-11-0 2023-03-1 2021-12-2 2023-06-0 2022-01-1 2023-06-0 2022-02-1 2023-06-0 2023-02-1 IDA / 60880 Post Open 0.00 Signed ocial mobilization and insti g ultant Selection 1 3 0 6 0 7 4 7 4 tutional development in To loikon Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-10 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-07-2 2022-01-1 2022-08-0 2022-02-1 2022-08-2 2023-02-1 IDA / 60880 Post Open 1,260.48 Signed social mobilization and inst g ultant Selection 1 7 0 7 0 9 4 1 4 itutional development in Er kin-Too Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-11 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2023-03-1 2021-12-2 2023-06-0 2022-01-1 2023-06-0 2022-02-1 2023-06-2 2023-02-1 2023-12-3 IDA / 60880 Post Open 0.00 Completed social mobilization and inst g ultant Selection 1 3 0 6 0 7 4 0 4 1 itutional development in K yzyl-Bairak Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-12 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2022-03-0 2021-12-2 2022-04-1 2022-01-1 2022-04-2 2022-02-1 2022-05-0 2023-02-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 1 0 8 0 5 4 5 4 itutional development in K abyk Osh oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-13 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2022-06-2 2021-12-2 2022-09-2 2022-01-1 2022-10-0 2022-02-1 2022-10-1 2023-02-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 7 0 0 0 3 4 9 4 itutional development in E nchilesh Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-14 / Local expert on Institutional Strengthenin Individual Cons 2021-08-0 2021-03-0 2021-09-1 2021-05-2 2021-10-1 2021-05-2 2021-11-1 2021-06-1 2022-11-1 IDA / 60880 Post Open 7,253.53 Signed social mobilization and inst g ultant Selection 1 1 9 0 0 5 4 1 4 itutional development in Je ti-Oguz Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-15 / Local expert on Institutional Strengthenin Individual Cons 2021-08-0 2021-03-0 2021-09-1 2021-05-2 2021-10-1 2021-05-2 2021-11-1 2021-06-1 2022-11-1 IDA / 60880 Post Open 6,951.30 Signed social mobilization and inst g ultant Selection 1 1 9 0 0 5 4 7 4 itutional development in B oz-Beshik Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-16 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2022-04-2 2021-12-2 2022-06-0 2022-01-1 2022-06-0 2022-02-1 2022-06-1 2023-02-1 IDA / 60880 Post Open 3,360.56 Signed social mobilization and inst g ultant Selection 1 6 0 6 0 6 4 1 4 itutional development in B arbulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-17 / Local expert on Institutional Strengthenin Individual Cons 2021-11-0 2023-08-2 2021-12-2 2023-11-1 2022-01-1 2023-11-1 2022-02-1 2023-11-2 2023-02-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 4 0 0 0 4 4 7 4 itutional development in K urmontu Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-18 / Local expert on Institutional Strengthenin Individual Cons 2021-09-0 2023-10-1 2021-10-2 2023-11-1 2021-11-1 2023-11-1 2021-12-1 2022-12-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 3 0 0 0 0 5 5 itutional development in Ki chi-Oruktuu Issyk-Kul oblas t IDA-SRWSSDP-AF-IC-FIDS- 2021-19 / Local expert on Institutional Strengthenin Individual Cons 2021-09-0 2022-06-2 2021-10-2 2022-10-0 2021-11-1 2022-10-1 2021-12-1 2022-10-2 2022-12-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 7 0 1 0 2 5 5 5 itutional development in Jy luu-Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-20 / Local expert on Institutional Strengthenin Individual Cons 2021-06-0 2023-03-1 2021-07-2 2023-06-0 2021-08-1 2023-06-0 2021-09-1 2023-06-2 2022-09-1 IDA / 60880 Post Open 0.00 Signed social mobilization and inst g ultant Selection 1 3 0 6 0 7 4 0 4 itutional development in G rigorevka Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-21 / Local expert on Institutional Strengthenin Individual Cons Pending Imple 2021-06-0 2021-07-2 2021-08-1 2021-09-1 2022-09-1 IDA / 60880 Post Open 0.00 social mobilization and inst g ultant Selection mentation 1 0 0 4 4 itutional development in K arool-Dobo Issyk-Kul oblas t IDA-SRWSSDP-AF-IC-FIDS- 2020-14 / Local expert on Institutional Strengthenin Individual Cons 2020-08-1 2021-03-0 2020-09-2 2021-04-2 2020-10-1 2021-04-2 2020-11-2 2021-05-1 2021-11-2 IDA / 60880 Post Open 6,602.55 Signed social mobilization and inst g ultant Selection 0 2 8 0 9 6 3 0 3 itutional development in G ornaya Maevka Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-22 / Local expert on Institutional Strengthenin Individual Cons 2021-01-1 2021-03-0 2021-02-2 2021-04-1 2021-03-2 2021-04-1 2021-04-2 2021-04-2 2022-04-2 2021-12-3 IDA / 60880 Post Open 3,997.23 Completed social mobilization and inst g ultant Selection 0 1 8 6 1 6 5 3 5 1 itutional development in B eisheke Chui oblast IDA-SRWSSDP-AF-IC-FIDS- 2021-23 / Local expert on Institutional Strengthenin Individual Cons 2021-02-1 2021-03-0 2021-03-3 2021-04-1 2021-04-2 2021-04-1 2021-05-2 2021-04-2 2022-05-2 IDA / 60880 Post Open 6,826.51 Signed social mobilization and inst g ultant Selection 0 1 1 6 1 9 6 3 6 itutional development in K en-Bulun Chui oblast IDA-SRWSSDP-IC-TRNG-20 20-14 / Consultant-trainers Institutional Strengthenin Individual Cons 2020-02-0 2020-02-1 2020-03-0 2020-04-0 2020-10-0 IDA / D1380 Post Limited 0.00 Canceled for LSGB, CDWUU and oth g ultant Selection 7 2 4 8 5 er rural water services pro viders’ staff training (# 14 ) IDA-SRWSSDP-CS-SSS-202 2021-06-0 2022-11-0 2021-06-1 2022-11-1 2021-08-1 2022-11-1 2022-08-1 1-2 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Signed 1 8 1 1 5 4 5 r 5 WSS sub-projects in Os h oblast (2 Phase) IDA-SRWSSDP-CS-SSS-202 1-1 / Author supervision fo Pending Imple 2021-04-0 2021-04-1 2021-06-1 2022-06-1 IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 r 4 WSS sub-projects in Iss mentation 1 1 5 5 yk-Kul oblast (1 Phase) IDA-SRWSSDP-CS-SSS-202 1-3 / Author supervision fo 2021-11-0 2022-10-1 2021-11-1 2022-10-1 2022-01-1 2022-10-2 2023-01-1 IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Signed r 5 WSS sub-projects in Iss 1 9 1 9 5 1 5 yk-Kul oblast (2 Phase) IDA-SRWSSDP-CS-SSS-202 Pending Imple 2020-12-0 2020-12-1 2021-02-1 2022-02-1 0-5 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 mentation 1 1 4 4 r 4 WSS sub-projects in Os h oblast (1 Phase) IDA-SRWSSDP-CS-SSS-202 Pending Imple 2020-08-1 2020-08-2 2020-10-3 2021-10-3 0-4 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 mentation 7 7 1 1 r 10 WSS sub-projects in C hui oblast (1 Phase) IDA-SRWSSDP-CS-SSS-202 Pending Imple 2021-11-0 2021-11-1 2022-01-1 2023-01-1 1-4 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 mentation 1 1 5 5 r 5 WSS sub-projects in Ch ui oblast (3 Phase) IDA-SRWSSDP-CS-SSS-202 2021-11-0 2023-03-2 2021-11-1 2023-03-3 2022-01-1 2023-03-3 2023-01-1 1-5 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Signed 1 8 1 0 5 1 5 r 5 WSS sub-projects in Ch ui oblast (2 Phase) IDA-SRWSSDP-AF-IC-EIA-2 021 / Consultant for Engin eering, Environmental and Individual Cons 2021-02-0 2021-02-2 2021-02-2 2021-03-0 2021-03-0 2021-04-1 Sanitary Safety Review (as IDA / D2040 Water Supply Investments Post Open 0.00 Canceled ultant Selection 3 4 7 2 6 0 sess and forecast the impa ct of the water supply proj ect and prepared designs on utilities, environmental and sanitary safety) IDA-SRWSSDP-AF-IC-FSS-2 020-2-RT1 / Consultants o Individual Cons 2020-05-0 2020-05-0 2020-06-1 2020-06-1 2020-07-1 2020-06-1 2020-08-1 2020-06-2 2021-02-1 2020-11-0 IDA / 60880 Sanitation Development Post Open 2,061.39 Completed n activities with communiti ultant Selection 1 1 9 5 0 8 4 3 0 4 es and householders in Kor ul subproject #2 IDA-SRWSSDP-IC-COMP2- 2020-5/1 / Consultant for t he development of inform Individual Cons 2020-06-0 2020-06-0 2020-07-2 2020-07-1 2020-08-1 2020-08-1 2020-09-2 2020-08-2 2021-03-2 2020-09-2 IDA / 60880 Sanitation Development Post Open 709.46 Completed ation-educational material ultant Selection 9 5 8 7 8 4 2 4 1 5 s to prevent the spread of COVID-19 virus in the Kyrg yz Republic (second) IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-08-0 2020-08-0 2020-09-1 2020-11-1 2020-10-1 2020-11-2 2020-11-1 2020-12-0 2021-11-0 2022-01-0 20-13 / Field technical sup IDA / 60880 Water Supply Investments Post Open 8,229.75 Completed ultant Selection 1 1 9 7 0 5 4 6 9 5 ervision engineer in Por Os h oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2020-08-0 2020-08-0 2020-09-1 2020-11-1 2020-10-1 2020-11-2 2020-11-1 2020-12-0 2021-11-0 20-12 / Field technical sup IDA / 60880 Water Supply Investments Post Open 12,323.87 Signed ultant Selection 1 1 9 7 0 5 4 6 9 ervision engineer in Kenes h Osh oblast IDA-SRWSSDP-AF-IC-2019 -40 / Consultant on verific ation of household sanitat Individual Cons 2020-09-1 2020-09-1 2020-10-2 2020-11-2 2020-11-1 2020-11-2 2020-12-2 2020-12-0 2021-06-2 2021-02-0 IDA / 60880 Sanitation Development Post Open 1,414.19 Completed ion facilities in pilot village ultant Selection 0 0 9 5 9 6 4 5 2 5 s Ak-Bulak and Kotormo Ky rgyz-Ata ayil okmotu, Nook at district, Osh oblast. IDA-SRWSSDP-DC-2020-1 / Аuthor supervision of sub 2020-09-0 2020-09-0 2020-09-1 2020-09-1 2020-11-1 2020-10-0 2021-05-1 IDA / 59070 Sanitation Development Post Direct Selection Direct 7,029.95 Signed -projects for outside toilets 1 1 1 6 5 5 4 in Chui and Osh oblasts (3 rd phase) IDA-SRWSSDP-DC-2020-2 / Аuthor supervision of sub Under Impleme 2020-09-0 2020-09-1 2020-11-1 2021-05-1 IDA / 59070 Sanitation Development Post Direct Selection Direct 0.00 -projects for outside toilets ntation 1 1 5 4 in Chui and Issuk-Kul obla sts (3rd phase) IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-04-2 2021-04-3 2021-05-1 2021-05-2 2021-05-3 2021-06-0 2021-06-1 2021-06-2 2022-06-1 20-11-1 / Junior field techn IDA / 60880 Water Supply Investments Post Limited 5,283.80 Signed ultant Selection 6 0 0 4 1 3 4 1 4 ical supervision engineer i n Gornaya Maevka IDA-SRWSSDP-AF-IC-2021 Individual Cons 2021-04-2 2021-04-3 2021-05-1 2021-06-2 2021-05-3 2021-07-0 2021-06-1 2021-07-1 2022-06-1 -20 / Sanitation Subsidy Co IDA / D2040 Sanitation Development Post Limited 6,982.22 Signed ultant Selection 6 0 0 5 1 5 4 1 4 nsultant of Chuy oblast IDA-SRWSSDP-AF-IC-2021 Individual Cons 2021-04-2 2021-04-3 2021-05-1 2021-06-2 2021-05-3 2021-07-0 2021-06-1 2021-07-1 2022-06-1 2022-06-3 -21 / Sanitation Subsidy Co IDA / D2040 Sanitation Development Post Limited 3,586.97 Completed ultant Selection 6 0 0 5 1 5 4 1 4 0 nsultant of Issyk-Kul oblast Page 11 IDA-SRWSSDP-AF-IC-FIDS- 2020-27 / Local expert on Institutional Strengthenin Individual Cons 2021-05-0 2021-05-0 2021-06-2 2021-06-2 2021-07-1 2021-06-2 2021-08-1 2021-07-1 2022-08-1 IDA / 60880 Post Open 5,658.65 Signed social mobilization and inst g ultant Selection 4 3 2 1 3 8 7 5 7 itutional development in K yzyl Zhar subproject IDA-SRWSSDP-AF-IC-FIDS- 2020-28 / Local expert on Institutional Strengthenin Individual Cons 2021-05-0 2021-05-0 2021-06-2 2021-07-2 2021-07-1 2021-07-2 2021-08-1 2021-08-1 2022-08-1 IDA / 60880 Post Open 5,187.09 Signed social mobilization and inst g ultant Selection 4 3 2 0 3 8 7 5 7 itutional development in K oo Chaty subproject IDA-SRWSSDP-AF-IC-FSS-2 020-27 / Consultants on ac Individual Cons 2021-05-0 2021-03-3 2021-06-2 2021-06-2 2021-07-1 2021-06-2 2021-08-1 2021-07-1 2022-05-1 IDA / 60880 Sanitation Development Post Open 4,244.12 Signed tivities with communities a ultant Selection 4 0 2 8 3 9 7 5 8 nd householders in Kyzyl Z har subproject IDA-SRWSSDP-AF-IC-FSS-2 020-28 / Consultants on ac Individual Cons 2021-05-0 2021-03-3 2021-06-2 2021-06-2 2021-07-1 2021-06-2 2021-08-1 2021-07-1 2022-05-1 IDA / 60880 Sanitation Development Post Open 4,244.12 Signed tivities with communities a ultant Selection 4 0 2 8 3 9 7 5 8 nd householders in Koo Ch aty subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-05-0 2021-04-0 2021-06-2 2021-05-2 2021-07-1 2021-06-0 2021-08-1 2021-06-2 2022-08-1 20-27 / Field technical sup IDA / 60880 Water Supply Investments Post Open 7,241.60 Signed ultant Selection 4 5 2 7 3 9 7 8 7 ervision engineer Kyzyl Zh ar IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2021-05-0 2021-04-0 2021-06-2 2021-05-2 2021-07-1 2021-06-0 2021-08-1 2021-06-2 2022-08-1 20-28 / Field technical sup IDA / 60880 Water Supply Investments Post Open 7,241.60 Signed ultant Selection 4 5 2 7 3 9 7 8 7 ervision engineer Koo Chat y IDA-SRWSSDP-IC-MWU-20 21 / Consultant on Perform Institutional Strengthenin Individual Cons 2021-06-2 2021-07-2 2021-07-2 2021-09-2 2021-08-0 2021-09-2 2021-08-1 2021-10-0 2024-02-0 ance Improvement of Wat IDA / D2040 Post Limited 2,546.46 Signed g ultant Selection 8 7 8 7 4 9 8 5 4 er Supply Utilities, Operati on and Maintenance of Rur al Water Supply Systems IDA-SRWSSDP-IC-2021-1 / Individual Cons 2021-08-0 2021-09-1 2021-10-1 2021-11-1 2022-11-1 IDA / D1380 Water Supply Investments Post Open 0.00 Canceled Infrastructure engineer ass ultant Selection 1 9 0 4 4 istant IDA-SRWSSDP-AF-IC-FSS-2 020-15-1 / Consultants on Individual Cons 2021-03-2 2021-03-2 2021-05-1 2021-05-2 2021-05-3 2021-06-2 2021-07-0 2021-07-1 2022-04-0 2022-01-1 activities with communitie IDA / 60880 Sanitation Development Post Open 2,829.28 Completed ultant Selection 9 9 0 4 1 2 5 5 1 7 s and householders in Gor naya Maevka subproject (s econd) IDA-SRWSSDP-AF-IC-FSS-2 021-23-1 / Consultants on Individual Cons 2021-03-2 2021-03-2 2021-05-1 2021-04-2 2021-05-3 2021-04-2 2021-07-0 2021-05-1 2022-04-0 2022-02-1 IDA / 60880 Sanitation Development Post Open 4,244.05 Completed activities with communitie ultant Selection 9 4 0 7 1 8 5 4 1 7 s and householders in Ken Bulun subproject (second) IDA-SRWSSDP-AF-IC-FSS-2 021-5-1 / Consultants on a Individual Cons 2021-03-2 2021-03-2 2021-05-1 2021-05-2 2021-05-3 2021-06-0 2021-07-0 2021-06-2 2022-04-0 2022-03-1 ctivities with communities IDA / 60880 Sanitation Development Post Open 4,158.19 Completed ultant Selection 9 3 0 0 1 2 5 1 1 6 and householders in Ivano vka Station subproject (se cond) IDA-SRWSSDP-AF-IC-FIDS- 2020-14-1 / Local expert o Institutional Strengthenin Individual Cons 2021-03-2 2021-03-0 2021-05-1 2021-05-2 2021-05-3 2021-06-2 2021-07-0 2021-07-1 2022-06-3 n social mobilization and i IDA / 60880 Post Open 5,658.56 Signed g ultant Selection 9 2 0 0 1 2 5 5 0 nstitutional development i n Gornaya Maevka subproj ect (second) IDA-SRWSSDP-AF-IC-IVA-2 021-2 / Independent Verifi Individual Cons 2021-11-0 2021-11-0 2021-12-2 2022-01-2 2022-01-1 2022-03-0 2022-02-1 2022-03-2 2022-08-1 IDA / 60880 Sanitation Development Post Open 0.00 Signed cation Agent (IVA) for Hou ultant Selection 2 3 1 0 1 1 5 8 4 sehold Sanitation Facilities in Chuy oblast IDA-SRWSSDP-AF-IC-IVA-2 021-3 / Independent Verifi Individual Cons Under Impleme 2021-11-0 2021-11-0 2021-12-2 2022-01-1 2022-02-1 2022-08-1 IDA / 60880 Sanitation Development Post Open 0.00 cation Agent (IVA) for Hou ultant Selection ntation 2 3 1 1 5 4 sehold Sanitation Facilities in Issyk-Kul oblast IDA-SRWSSDP-AF-IC-IVA-2 021-1 / Independent Verifi Individual Cons 2021-11-0 2021-11-0 2021-12-2 2022-01-2 2022-01-1 2022-03-0 2022-02-1 2022-03-1 2022-08-1 2022-03-3 IDA / 60880 Sanitation Development Post Open 0.00 Completed cation Agent (IVA) for Hou ultant Selection 3 3 2 0 2 1 6 8 5 0 sehold Sanitation Facilities in Osh oblast IDA-SRWSSDP-AF-IC-TS-20 21-5-1 / Field technical sup Individual Cons 2021-11-0 2021-03-2 2021-12-2 2021-07-2 2022-01-1 2021-08-1 2022-02-1 2021-10-0 2023-02-1 IDA / 60880 Water Supply Investments Post Open 6,153.69 Signed ervision engineer in Ivanov ultant Selection 3 9 2 6 2 7 6 5 6 ka station Chui oblast (sec ond) IDA-SRWSSDP-IC-2021-2 / Institutional Strengthenin Individual Cons 2021-11-2 2021-11-2 2022-01-1 2022-01-2 2022-02-0 2022-01-2 2022-03-0 2022-02-0 2024-12-3 Senior Field Specialist for I IDA / 59070 Post Open 2,829.28 Terminated g ultant Selection 4 6 2 0 2 6 9 2 1 nstitutional Development i n Osh oblast IDA-SRWSSDP-IC-2021-3 / Institutional Strengthenin Individual Cons 2021-11-2 2021-11-2 2022-01-1 2022-01-1 2022-02-0 2022-01-2 2022-03-0 2022-02-1 2024-12-3 Senior Field Specialist for I IDA / 59070 Post Open 2,829.28 Signed g ultant Selection 4 6 2 8 2 6 9 2 1 nstitutional Development i n Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Under Impleme 2021-12-0 2022-02-2 2022-01-1 2022-02-0 2022-03-1 2023-03-1 21-23-RT-1 / Field technica IDA / 60880 Water Supply Investments Post Open 0.00 ultant Selection ntation 1 4 9 9 6 6 l supervision engineer in K en-Bulun Chui oblast IDA-SRWSSDP-AF-IC-TRNG -2022-1 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-05-2 2022-11-2 aining of local self-governa IDA / 60880 Post Open 4,081.37 Signed g ultant Selection 7 7 7 3 8 3 2 8 9 nce bodies, CDWUU and ot her rural water supply utili ties #1 IDA-SRWSSDP-AF-IC-TRNG -2022-2 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-06-0 2022-11-2 2023-01-1 aining of local self-governa IDA / 60880 Post Open 4,081.37 Signed g ultant Selection 7 7 7 3 8 3 2 5 9 3 nce bodies, CDWUU and ot her rural water supply utili ties #2 IDA-SRWSSDP-AF-IC-TRNG -2022-3 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-05-2 2022-11-2 aining of local self-governa IDA / 60880 Post Open 4,081.37 Signed g ultant Selection 7 7 7 3 8 3 2 8 9 nce bodies, CDWUU and ot her rural water supply utili ties #3 IDA-SRWSSDP-AF-IC-TRNG -2022-4 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-05-2 2022-11-2 aining of local self-governa IDA / 60880 Post Open 4,081.37 Signed g ultant Selection 7 7 7 3 8 3 2 8 9 nce bodies, CDWUU and ot her rural water supply utili ties #4 IDA-SRWSSDP-AF-IC-TRNG -2022-5 / Consultant for tr Institutional Strengthenin Individual Cons 2022-02-1 2022-03-0 2022-04-0 2022-05-2 2022-04-2 2022-05-2 2022-06-0 2022-06-0 2022-11-2 2023-01-1 aining of local self-governa IDA / 60880 Post Open 4,081.37 Signed g ultant Selection 7 7 7 3 8 3 2 5 9 3 nce bodies, CDWUU and ot her rural water supply utili ties #5 IDA-SRWSSDP-AF-IC-FIDS- 2020-8-RT1 / Local expert Institutional Strengthenin Individual Cons 2022-02-2 2021-03-0 2022-04-1 2021-04-1 2022-05-0 2021-04-1 2022-06-0 2021-05-0 2023-06-0 IDA / 60880 Post Open 6,812.33 Signed on social mobilization and g ultant Selection 4 3 4 6 5 6 9 3 9 institutional development i n Chon-Daly subproject IDA-SRWSSDP-AF-CS-SSS- 2021-10 / Consultant for s Under Impleme 2021-07-1 2021-07-2 2021-08-0 2021-12-3 urvey, preparation of BoQ IDA / D2040 Sanitation Development Post Direct Selection Direct 0.00 ntation 2 2 2 1 and drawings for rehabilita tion of indoor sanitary facil ities in schools of Chaichi s ubproject IDA-SRWSSDP-IC-TRNG-20 22-1 / Trainer on conductin Individual Cons 2022-03-1 2022-03-1 2022-05-0 2022-05-2 2022-05-2 2022-05-2 2022-06-2 2022-05-2 2023-06-2 IDA / D1380 Sanitation Development Post Open 2,577.57 Signed g trainings for sanitation fi ultant Selection 4 0 2 3 3 3 7 8 7 eld officers on WASH in Sc hools Methodology IDA-SRWSSDP-IC-TRNG-20 22-2 / Trainer on conductin Individual Cons 2022-03-1 2022-03-1 2022-03-1 2022-05-2 2022-04-0 2022-05-2 2022-05-1 2022-05-2 2023-05-1 g trainings for sanitation fi IDA / D1380 Sanitation Development Post Limited 0.00 Signed ultant Selection 4 0 9 3 9 3 4 4 4 eld officers on Household Sanitation Improvement M ethodology IDA-SRWSSDP-IC-2021-2- Institutional Strengthenin Individual Cons 2022-03-1 2022-03-2 2022-03-1 2022-01-1 2022-04-0 2022-03-2 2022-05-1 2022-04-0 2023-05-1 RT-1 / Senior Field Speciali IDA / D2040 Post Limited 0.00 Signed g ultant Selection 4 3 9 8 9 8 4 8 4 st for Institutional Develop ment in Osh oblast IDA-SRWSSDP-AF-DS-EIA- 2022 / Consultant for Engi neering, Environmental an 2022-03-2 2022-03-2 2022-03-2 2022-04-0 2022-04-0 2022-04-2 2022-06-1 d Sanitary Safety Review i IDA / D2040 Water Supply Investments Post Direct Selection Direct 3,731.78 Signed 5 3 7 5 1 0 0 n Subprojects Ivanovka St ation, Kara-Zhygach, Ken- Bulun, Sosnovka, Komsom ol’skoe, Kurmontu, Bokso- Zhol, Kayirma IDA-SRWSSDP-AF-IC-2022 Individual Cons Under Impleme 2022-04-2 2022-06-0 2022-06-2 2022-08-0 2023-08-0 -1 / Supervision Engineer/ IDA / 59070 Water Supply Investments Post Open 0.00 ultant Selection ntation 0 8 9 3 3 Hydrogeologist in Osh obla st IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-04-2 2022-06-2 2022-06-0 2022-06-2 2022-06-2 2022-06-3 2022-08-0 2022-07-0 2023-08-0 2022-09-3 -2 / Supervision Engineer/ IDA / 59070 Water Supply Investments Post Open 0.00 Completed ultant Selection 0 9 8 9 9 0 3 8 3 0 Hydrogeologist in Chui and Issyk kul oblast IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-04-1 2022-06-2 2022-05-3 2022-07-1 2022-05-3 2022-08-2 2022-06-1 2024-08-2 -5 / Sanitation Subsidy Con IDA / D2040 Sanitation Development Post Open 0.00 Signed ultant Selection 0 8 8 1 9 1 3 4 2 sultant of Chui oblast IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-04-2 2022-06-2 2022-06-0 2022-07-1 2022-06-0 2022-08-2 2022-06-1 2024-08-2 -6 / Sanitation Subsidy Con IDA / D2040 Sanitation Development Post Open 3,360.56 Signed ultant Selection 0 6 8 6 9 6 3 1 2 sultant of Issyk-Kul oblast IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-05-3 2022-06-2 2022-05-2 2022-07-1 2022-06-1 2022-08-2 2022-06-2 2024-08-2 IDA / D2040 Sanitation Development Post Open 0.00 Signed -7 / Sanitation Subsidy Con ultant Selection 0 0 8 7 9 7 3 4 2 sultant of Osh IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-04-2 2022-06-2 2022-05-3 2022-07-1 2022-05-3 2022-08-2 2022-06-1 2024-08-2 IDA / D2040 Sanitation Development Post Open 6,805.14 Signed -4 / Sanitation Engineer ultant Selection 0 7 8 0 9 0 3 8 2 IDA-SRWSSDP-AF-IC-2022 Individual Cons 2022-05-1 2022-04-2 2022-06-2 2022-07-2 2022-07-1 2022-08-0 2022-08-2 2022-08-1 2024-08-2 IDA / D2040 Sanitation Development Post Open 1,494.00 Signed -3 / Public Relations Specia ultant Selection 0 6 8 5 9 1 3 3 2 list IDA-SRWSSDP-AF-IC-FIDS- 2022-1-RT-1 / Local expert Institutional Strengthenin Individual Cons 2022-07-0 2022-06-1 2022-08-1 2022-07-2 2022-09-0 2022-08-0 2022-10-0 2022-08-2 2023-04-0 on social mobilization and IDA / 60880 Post Open 2,490.01 Signed g ultant Selection 1 7 9 5 2 1 7 4 5 institutional development i n Kenesh and Chon Daly s ubproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2022-07-0 2022-06-2 2022-08-1 2022-07-2 2022-09-0 2022-07-2 2022-10-1 2022-08-1 2023-04-1 21-4-1 / Junior field technic IDA / 60880 Water Supply Investments Post Open 0.00 Signed ultant Selection 1 3 9 5 9 7 4 8 2 al supervision for Sosnovk a subproject IDA-SRWSSDP-AF-IC-FSS-2 021-4-1 / Consultants on a Individual Cons 2022-06-0 2022-06-1 2022-07-2 2022-04-2 2022-08-1 2022-04-2 2022-09-1 2022-05-1 2023-06-1 IDA / 60880 Sanitation Development Post Open 0.00 Signed ctivities with communities ultant Selection 3 7 2 0 2 5 6 5 7 and householders in Sosno vka subproject IDA-SRWSSDP-СS-SSS-202 2022-06-0 2022-05-1 2022-06-1 2022-05-2 2022-08-1 2022-06-1 2023-08-1 2-3 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct 0.00 Signed 2 0 2 3 6 6 6 r 4 WSS sub-projects in Ch ui oblast ARIS-IDA-SRWSSDP-HO-20 Individual Cons 2022-07-0 2022-06-2 2022-08-1 2022-08-0 2022-09-0 2022-08-1 2022-10-1 2022-09-0 2023-04-1 IDA / D1380 Water Supply Investments Post Open 0.00 Signed 22-1 / Assistant of safegua ultant Selection 1 4 9 8 9 5 4 1 2 rds specialist IDA-SRWSSDP-AF-IC-IVA-2 022-1 / Independent Verifi Individual Cons 2023-01-0 2023-08-0 2023-02-1 2023-09-0 2023-03-1 2023-10-0 2023-04-1 2023-10-1 2023-12-2 IDA / D2040 Sanitation Development Post Open - National 0.00 Terminated cation Agent (IVA) for Hou ultant Selection 1 3 9 1 2 5 6 3 2 sehold Sanitation Facilities in Chuy and Issyk-Kul obla sts. IDA-SRWSSDP-AF-IC-IVA-2 022-2 / Independent Verifi Individual Cons 2023-01-1 2023-08-0 2023-02-2 2023-03-2 2023-04-2 2023-12-3 IDA / D2040 Sanitation Development Post Open - National 0.00 Canceled cation Agent (IVA) for Hou ultant Selection 0 3 8 1 5 1 sehold Sanitation Facilities in Osh oblast IDA-SRWSSDP-AF-IC-ENG- 2022-1 / Consultant for pre Individual Cons 2023-01-1 2023-03-2 2023-02-2 2023-05-1 2023-03-2 2023-05-1 2023-04-2 2023-05-1 2023-12-3 2023-08-1 paration of BoQ and drawi IDA / D2040 Sanitation Development Post Open - National 0.00 Completed ultant Selection 0 9 8 0 1 9 5 9 1 8 ngs for rehabilitation of int ernal sanitary units and fa cilities of kindergartens in Osh region IDA-SRWSSDP-AF-IC-ENG- 2022-2 / Consultant for pre paration of BoQ and drawi Individual Cons 2023-01-1 2023-05-0 2023-02-2 2023-05-1 2023-03-2 2023-05-1 2023-04-2 2023-05-1 2023-12-3 2023-10-2 IDA / D2040 Sanitation Development Post Open - National 0.00 Completed ngs for rehabilitation of int ultant Selection 0 2 8 0 1 9 5 9 1 3 ernal sanitary units and fa cilities of kindergartens in Chui and Issyk-Kul region IDA-SRWSSDP-AF-IC-2023 Individual Cons 2023-04-0 2023-04-1 2023-05-2 2023-06-0 2023-06-1 2023-06-0 2023-07-2 2023-06-0 2024-01-1 -1 / Consultant on sanitary IDA / D2040 Sanitation Development Post Open - National 0.00 Signed ultant Selection 6 2 5 1 5 7 0 7 6 subsidies for Osh region (E ngineer) IDA-SRWSSDP-IC-2023-1 / Senior Field Specialist for I Institutional Strengthenin Individual Cons 2023-04-1 2023-04-1 2023-06-0 2023-06-0 2023-06-1 2023-06-0 2023-06-2 2023-06-0 2025-09-0 IDA / D2040 Post Open - National 0.00 Signed nstitutional Development i g ultant Selection 4 8 1 6 1 7 6 7 3 n Subprojects of Chui Obla st IDA-SRWSSDP-IC-2023-2 / Institutional Strengthenin Individual Cons 2023-04-1 2023-04-1 2023-05-2 2023-06-0 2023-06-0 2023-06-0 2023-06-2 2023-06-0 2025-08-3 IDA / D2040 Post Open - National 0.00 Signed Institutional Development g ultant Selection 1 8 9 6 8 7 3 7 1 Assistant IDA-SRWSSDP-AF-IC-TRNG Institutional Strengthenin Individual Cons Pending Imple 2023-06-0 2023-07-0 2023-07-0 2023-07-1 2024-07-0 -2023-1 / Treiner for Aiyl O IDA / 60880 Post Open - National 0.00 g ultant Selection mentation 6 4 9 2 6 kmotu and CDWUUs (#19) Page 12 IDA-SRWSSDP-AF-IC-TRNG Institutional Strengthenin Individual Cons Pending Imple 2023-06-0 2023-07-0 2023-07-1 2023-07-1 2024-07-0 -2023-2 / Treiner for Aiyl O IDA / 60880 Post Open - National 0.00 g ultant Selection mentation 6 5 0 4 8 kmotu and CDWUUs (#20) IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-04-2 2023-04-2 2023-05-2 2023-05-1 2023-06-1 2023-05-1 2023-06-1 2023-05-1 2024-07-2 21-4/2 / Field technical sup IDA / 60880 Water Supply Investments Post Open - National 0.00 Signed ultant Selection 3 1 1 1 3 8 8 8 2 ervision engineer in Sosno vka Chui oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-04-2 2023-05-2 2023-05-2 2023-05-2 2024-05-2 21-19/1 / Field technical su IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 5 4 6 8 2 pervision engineer in Jyluu -Bulak Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-08-0 2023-07-1 2023-09-0 2023-09-1 2023-09-2 2025-02-0 23-1 / Field technical super IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 6 0 4 0 6 7 vision engineer in Kichi-Bul olu Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-12-1 2024-01-0 2024-01-1 2024-01-1 2025-06-0 23-2 / Field technical super IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 1 9 1 9 2 vision engineer in Gulbaar Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-12-1 2024-01-1 2024-01-1 2024-01-1 2025-05-3 23-3 / Field technical super IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 1 0 4 6 0 vision engineer in Otuz-Ad yr Osh oblast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-12-1 2024-01-1 2024-01-1 2024-01-1 2025-05-2 23-4 / Field technical super IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 1 0 2 5 9 vision engineer in Kum-Ary k Chui oblast IDA-SRWSSDP-AF-IC-TS-20 23-5 / Field technical super Individual Cons 2023-05-0 2023-04-2 2023-06-0 2023-06-0 2023-06-0 2023-06-0 2023-06-1 2023-06-0 2024-10-2 2023-12-3 IDA / 60880 Water Supply Investments Post Open - National 0.00 Completed vision engineer in Sultan f ultant Selection 5 5 8 1 9 2 2 2 4 1 or additional work Chui obl ast IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-05-0 2023-05-1 2023-06-0 2023-06-0 2023-07-1 2024-11-2 23-6 / Junior field technical IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 5 8 8 9 5 6 supervision for Kurpuldok subproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-05-0 2023-05-1 2023-06-0 2023-06-0 2023-07-0 2024-09-2 23-7 / Junior field technical IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 5 8 8 9 2 4 supervision for Orto-Aryk s ubproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons Under Impleme 2023-12-1 2023-08-0 2024-01-1 2024-01-1 2024-02-0 2025-05-0 23-8 / Junior field technical IDA / 60880 Water Supply Investments Post Open - National 0.00 ultant Selection ntation 1 3 4 5 7 2 supervision for Kum-Aryk s ubproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-09-0 2023-08-0 2023-10-0 2023-12-0 2023-10-0 2023-12-0 2023-11-0 2023-12-2 2025-01-2 23-9 / Junior field technical IDA / 60880 Water Supply Investments Post Open - National 0.00 Signed ultant Selection 4 3 8 7 9 7 1 9 4 supervision for Bokso-Jol s ubproject IDA-SRWSSDP-AF-IC-TS-20 Individual Cons 2023-04-2 2023-05-2 2023-05-3 2023-06-2 2024-09-1 23-10 / Field technical sup IDA / 60880 Water Supply Investments Post Open - National 0.00 Canceled ultant Selection 5 9 0 2 4 ervision engineer in Kaiyr ma Chui oblast IDA-SRWSSDP-СS-DS-202 Pending Imple 2023-12-1 2024-01-0 2024-01-1 2025-04-1 3-1 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 mentation 2 1 6 0 r Gulbaar WSS sub-project s in Osh oblast IDA-SRWSSDP-СS-DS-202 Under Impleme 2023-08-1 2024-04-2 2023-08-2 2023-09-0 2024-11-2 3-2 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 ntation 1 3 1 5 8 r Kichi Bulolu WSS sub-proj ects in Osh oblast IDA-SRWSSDP-СS-DS-202 Pending Imple 2023-12-1 2023-12-2 2024-01-1 2025-04-1 3-3 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 mentation 2 7 6 7 r Otuz-Adyr WSS sub-proje cts in Osh oblast IDA-SRWSSDP-AF-IC-2-20 23-1 / Consultant on proje Individual Cons Pending Imple 2023-06-0 2023-06-2 2023-06-2 2023-07-0 2024-06-3 IDA / D2040 Sanitation Development Post Open - National 0.00 ct development and autho ultant Selection mentation 6 6 8 6 0 r's supervision of subproje cts IDA-SRWSSDP-AF-IC-2-20 Individual Cons Under Impleme 2023-07-1 2024-04-0 2023-08-1 2023-08-2 2023-09-1 2024-09-1 23-2 / Sanitation Subsidy C IDA / D2040 Sanitation Development Post Open - National 0.00 ultant Selection ntation 1 4 9 2 6 0 onsultant of Osh oblast # 2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-1 / Consultant on ac Individual Cons 2023-09-0 2023-07-2 2023-10-1 2023-11-1 2023-10-1 2023-11-1 2023-10-2 2023-11-2 2024-10-1 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 Signed ultant Selection 9 7 3 0 6 0 1 7 5 nd householders in subproj ect “Kurmontu” (Field sani tation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-2 / Consultant on ac Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-01-2 2025-01-2 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 0 6 0 nd householders in subproj ect “Kum-Aryk” (Field sani tation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-3 / Consultant on ac Individual Cons 2023-08-0 2023-07-2 2023-09-1 2023-12-0 2023-09-1 2023-12-1 2023-09-1 2023-12-2 2024-09-1 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 Terminated ultant Selection 8 7 1 7 4 3 9 2 3 nd householders in subproj ect “Bokso-Jol” (Field sanit ation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-4 / Consultant on ac Individual Cons Under Impleme 2023-09-0 2024-04-1 2023-10-1 2023-10-1 2023-10-1 2024-10-1 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 7 6 1 4 9 3 nd householders in subproj ect “Kichi-Oruktuu” (Field sanitation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-5 / Consultant on ac Individual Cons Pending Imple 2023-09-0 2023-10-1 2023-10-1 2023-10-2 2024-10-1 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 7 0 2 0 4 nd householders in subproj ect “Karool-Dobo” (Field s anitation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-6 / Consultant on ac Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-01-2 2025-01-2 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 8 2 nd householders in subproj ect “Gulbar” (Field sanitat ion officer) #1 IDA-SRWSSDP-AF-IC-FSS-2 -2023-7 / Consultant on ac Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-02-1 2025-02-2 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 5 5 nd householders in subproj ect “Gulbar” (Field sanitat ion officer) #2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-8 / Consultant on ac Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-01-2 2025-01-2 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 8 2 nd householders in subproj ect “Gulbar” (Field sanitat ion officer) #3 IDA-SRWSSDP-AF-IC-FSS-2 -2023-9 / Consultant on ac Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 tivities with communities a IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 5 9 nd householders in subproj ect “Gulbar” (Field sanitat ion officer) #4 IDA-SRWSSDP-AF-IC-FSS-2 -2023-10 / Consultant on a Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 5 9 and householders in subpr oject “Gulbar” (Field sanit ation officer) #5 IDA-SRWSSDP-AF-IC-FSS-2 -2023-11 / Consultant on a Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 5 9 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #1 IDA-SRWSSDP-AF-IC-FSS-2 -2023-12 / Consultant on a Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 5 9 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-13 / Consultant on a Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 5 9 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #3 IDA-SRWSSDP-AF-IC-FSS-2 -2023-14 / Consultant on a Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-02-0 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 0 8 2 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #4 IDA-SRWSSDP-AF-IC-FSS-2 -2023-15 / Consultant on a Individual Cons Pending Imple 2023-12-1 2024-01-1 2024-01-2 2024-02-1 2025-02-0 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 5 8 1 5 9 and householders in subpr oject “Otuz-Adyr” (Field s anitation officer) #5 IDA-SRWSSDP-AF-IC-2-20 23-4 / Individual consultan Individual Cons Pending Imple 2023-06-0 2023-07-1 2023-07-1 2023-07-2 2024-07-1 t to update drinking water IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection mentation 6 0 2 0 4 quality control software in support of the Department of SES. IDA-SRWSSDP-AF-IC-FSS-2 -2023-16 / Consultant on a Individual Cons 2023-05-1 2023-05-1 2023-06-2 2023-06-1 2023-07-1 2023-06-1 2023-08-2 2023-06-1 2024-05-2 2024-04-3 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 Completed ultant Selection 0 5 8 2 9 9 3 9 3 0 and householders in subpr oject “Kyzyl-Bairak” of the Osh Oblast #2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-17 / Consultant on a Individual Cons 2023-05-1 2023-05-1 2023-06-2 2023-06-1 2023-07-1 2023-06-2 2023-08-2 2023-06-2 2024-05-2 2023-12-3 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 Completed ultant Selection 0 5 8 2 9 7 3 7 3 1 and householders in subpr oject “Toloikon” of the Osh Oblast #2 IDA-SRWSSDP-СS-DS-202 2023-06-1 2023-06-2 2023-06-2 2023-06-3 2023-07-0 2023-06-3 2024-09-2 3-4 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 Signed 4 3 9 0 6 0 8 r Grigorevka WSS sub-proj ect in Issyk-Kul oblast IDA-SRWSSDP-СS-DS-202 3-5 / Author supervision fo Pending Imple 2023-09-0 2023-09-1 2023-09-2 2024-12-1 IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 r Karool-Dobo WSS sub-pro mentation 4 9 6 9 ject in Issyk-Kul oblast IDA-SRWSSDP-AF-IC-TS-20 23-11 / Junior field technic Individual Cons 2023-07-2 2023-08-0 2023-08-2 2023-12-0 2023-08-2 2023-12-0 2023-09-0 2023-12-2 2024-08-2 IDA / 60880 Water Supply Investments Post Open - National 0.00 Signed al supervision for Kurmont ultant Selection 5 3 8 7 9 7 1 9 6 u subproject Issyk-Kul obla st IDA-SRWSSDP-СS-DS-202 Pending Imple 2023-09-0 2023-09-1 2023-09-2 2024-12-1 3-6 / Author supervision fo IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 mentation 4 9 6 9 r Kum-Aryk WSS sub-proje ct in Issyk-Kul oblast IDA-SRWSSDP-СS-DS-202 3-7 / Author supervision fo 2023-08-0 2023-08-1 2023-08-2 2024-11-1 IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 Canceled r Kichi-Oruktu WSS sub-pro 4 9 6 8 ject in Issyk-Kul oblast IDA-SRWSSDP-AF-IC-FSS-2 -2023-18 / Consultant on a ctivities with communities Individual Cons 2023-07-1 2023-07-2 2023-09-0 2023-11-1 2023-09-2 2023-11-1 2023-11-0 2023-11-2 2024-10-2 IDA / 60880 Sanitation Development Post Open - National 0.00 Signed and householders in subpr ultant Selection 9 7 6 0 7 0 1 7 6 oject “Grigorievka” of the I ssyk-Kul Oblast (Field sanit ation officer) IDA-SRWSSDP-AF-IC-FSS-2 -2023-19 / Consultant on a Individual Cons 2023-07-1 2023-07-2 2023-09-0 2023-11-1 2023-09-2 2023-12-2 2023-10-2 2023-12-2 2024-10-2 ctivities with communities IDA / 60880 Sanitation Development Post Open - National 0.00 Signed ultant Selection 4 7 1 0 2 1 7 9 1 and householders in subpr oject “Kichi Bulolu” of the Osh Oblast (Field sanitatio n officer) IDA-SRWSSDP-AF-IC-FIDS- 2023-1 / Social Mobilizatio Institutional Strengthenin Individual Cons 2023-07-1 2023-09-0 2023-09-2 2023-11-0 2024-10-3 IDA / 60880 Post Open - National 0.00 Canceled n and Institutional Develop g ultant Selection 9 6 7 1 1 ment Specialist Subproject Kichi-Bulolu Osh oblast IDA-SRWSSDP-IC-2023-3 / Institutional Strengthenin Individual Cons 2023-07-1 2023-08-0 2023-09-0 2023-09-0 2023-09-2 2023-09-0 2023-11-0 2023-09-0 2024-10-2 IDA / 59070 Post Open - National 0.00 Signed Consultant for Automated g ultant Selection 9 4 6 1 7 1 1 1 6 Billing IDA-SRWSSDP-AF-IC-2023 Individual Cons Under Impleme 2023-07-2 2023-09-1 2023-08-1 2023-12-0 2023-08-2 2023-12-0 2023-08-2 2024-08-2 IDA / 59070 Water Supply Investments Post Open - National 0.00 -3 / Hydrogeologist (all on ultant Selection ntation 0 4 8 7 3 7 7 6 needs basis) IDA-SRWSSDP-AF-IC-2023 Individual Cons Under Impleme 2023-07-2 2023-09-1 2023-08-1 2023-12-0 2023-08-2 2023-12-0 2023-08-2 2024-08-2 IDA / 59070 Water Supply Investments Post Open - National 0.00 -2 / Electrical (all on needs ultant Selection ntation 0 4 8 7 3 7 7 6 basis) IDA-SRWSSDP-СS-DS-202 3-8 / Adjustment of design 2023-08-1 2023-10-0 2023-08-2 2023-10-0 2023-10-0 2023-11-1 2023-12-0 IDA / 60880 Water Supply Investments Post Direct Selection Direct - National 0.00 Signed and estimate documentati 5 2 0 4 5 3 4 on for Karool-Dobo sub-pro ject IDA-SRWSSDP-AF-IC-TS-20 22-2-RT1 / Technical super Individual Cons Pending Imple 2023-08-2 2023-09-2 2023-10-0 2023-10-1 2024-03-1 IDA / 60880 Water Supply Investments Post Open - National 0.00 vision engineer for work in ultant Selection mentation 5 8 3 1 9 the sub-project "Vinogradn oye" Page 13 IDA-SRWSSDP-AF-IC-FSS-2 -2023-3/2 / Consultant on Individual Cons Under Impleme 2023-12-0 2023-12-0 2024-01-0 2024-04-0 2024-01-0 2024-04-0 2024-01-0 2024-10-0 activities with communitie IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 7 1 5 2 5 7 3 s and householders in sub project “Bokso-Jol” (Field sanitation officer)#2 IDA-SRWSSDP-AF-IC-FSS-2 -2023-1/2 / Consultant on Individual Cons Under Impleme 2023-12-0 2023-12-0 2024-01-0 2024-04-0 2024-01-0 2024-04-0 2024-01-1 2024-10-0 activities with communitie IDA / 60880 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 7 1 5 6 5 2 8 s and householders in sub project “Kurmontu” (Field sanitation officer) #2 IDA-SRWSSDP-IC-2023-4 / Consultant lawyer on deve Institutional Strengthenin Individual Cons Pending Imple 2023-12-0 2024-01-0 2024-01-0 2024-01-0 2024-12-3 IDA / 60880 Post Open - National 0.00 lopment of normative legal g ultant Selection mentation 5 1 2 5 0 acts for drinking water sup ply and wastewater dispos al IDA-SRWSSDP-AF-IC-IVA-2 022-1/RT1 / Independent V Individual Cons Under Impleme 2023-12-0 2023-12-0 2024-01-0 2023-12-2 2024-01-2 2023-12-2 2024-02-0 2024-12-3 erification Agent (IVA) for IDA / D2040 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 7 1 2 2 5 7 1 Household Sanitation Facili ties in Chuy and Issyk-Kul oblasts IDA-SRWSSDP-AF-IC-2022 Individual Cons Under Impleme 2024-03-1 2024-04-0 2024-04-1 2024-04-1 2024-04-1 2024-12-3 IDA / D2040 Sanitation Development Post Open - National 0.00 -3/RT1 / Public Relations S ultant Selection ntation 1 8 4 6 8 1 pecialist IDA-SRWSSDP-IC-2020-3/ Institutional Strengthenin Individual Cons Pending Imple 2024-04-0 2024-04-3 2024-05-0 2024-05-1 2025-05-1 IDA / 60880 Post Open - National 0.00 RT1 / Institutional specialis g ultant Selection mentation 1 0 5 5 0 t IDA-SRWSSDP-AF-IC-2-20 24-1 / Consultant for Prepa ration of Bills of Quantities Individual Cons Under Impleme 2024-04-0 2024-04-0 2024-04-3 2024-05-0 2024-05-1 2024-08-1 IDA / 60880 Sanitation Development Post Open - National 0.00 and Drawings by Technical ultant Selection ntation 1 4 0 5 5 3 Investigation of Indoor San itation Facilities at Pilot Cli nics in Chui (part 2) and Is syk-Kul Oblasts IDA-SRWSSDP-AF-IC-2-20 24-2 / Consultant for Prepa ration of Bills of Quantities Individual Cons Under Impleme 2024-04-0 2024-04-0 2024-04-3 2024-05-0 2024-05-1 2024-08-1 IDA / 60880 Sanitation Development Post Open - National 0.00 and Drawings by Technical ultant Selection ntation 1 4 0 5 5 3 Investigation of Indoor San itation Facilities at Pilot Cli nics in Chui (part 1) and O sh Oblasts IDA-SRWSSDP-AF-IC-2-20 Individual Cons Under Impleme 2023-06-1 2024-04-0 2023-07-2 2023-07-2 2023-07-3 2024-07-2 23-3 / Sanitation Subsidy C IDA / D2040 Sanitation Development Post Open - National 0.00 ultant Selection ntation 1 4 0 2 0 4 onsultant of Chui oblast # 2 IDA-SRWSSDP-AF-IC-2023 Individual Cons Under Impleme 2024-04-0 2024-04-0 2024-04-2 2024-05-0 2024-05-2 2024-12-3 -1/RT1 / Consultant on sani IDA / D2040 Sanitation Development Post Open - National 0.00 ultant Selection ntation 5 4 5 9 4 1 tary subsidies for Osh regi on (Engineer) Page 14