PROCUREMENT PLAN (Textual Part) Project information: Ethiopia, One WASH- Consolidated WASH Account (CWA) Project “Phase II”, P167794 Project Implementation agency: Water Development Commission (WDC) of the Ministry of Water, Irrigation and Energy (MoWIE) Date of the Procurement Plan: August 28, 2019 Period covered by this Procurement Plan: September 2019 to August 2020. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised August 2018) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Section 33(1)(a) from 35-48 of the Proclamation Number 649/2009 of the Ethiopian Federal Government Procurement and Property Administration Proclamation, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. • Open Advertising of the procurement opportunity at the national level; • The procurement is open to eligible firms from any country; • The request for bids/Proposal documents shall require that bidders/proposers submitting Bids/Proposal present a signed acceptance at the time of bidding, to be incorporated in any resulting contracts, confirming application of and compliance with the Bank’s Anti-Corruption Guidelines, including without limitation the bank’s right to sanction and the Bank’s inspection and audit right; • Contracts with an appropriate allocation of responsibilities, risks and liabilities; • Application of Standstill period and Publication of contract award information; • Maintenance of records of the procurement process; and • The Bank has the right to review procurement documentation and activities. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Second-Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: Is applicable for those contracts identified in the Procurement Plan; Works: Is applicable for those contracts identified in the Procurement Plan. Other Relevant Procurement Information. None PROCUREMENT Ethiopia : One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) PLAN General Information Country: Ethiopia Bank’s Approval Date of the Original Procurement Plan: 2020-03-11 Revised Plan Date(s): (comma delineated, leave blank if 2024-06-05 none) Project ID: P167794 GPN Date: 2019-12-06 Project Name: One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA) Loan / Credit No: IDA / 64450 TIGRAY WRDB Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned ET-TIGRAY WRDB-151604-C W-RFB / Civil work constructi on with supply and installati Urban Water Supply, Sanitati Single Stage - One E Under Imple 2021-04-2 on of Pipes ,Fittings and elec IDA / 64450 on, and Hygiene (Urban WAS Post Request for Bids Open - National 548,000.00 0.00 2020-03-04 2020-04-01 2020-03-19 2020-04-18 2020-05-04 2020-05-18 2020-06-28 nvelope mentation 4 tro-mechanical equipment's) H) forAdi Daero Town. Implementing Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-155372-C W-RFB / Drilling and pumping Urban Water Supply, Sanitati test of one Deep borehole fo Single Stage - One E 2020-07-2 IDA / 64450 on, and Hygiene (Urban WAS Post Request for Bids Open - National 56,655.00 30,670.14 Signed 2020-02-05 2020-04-13 2020-02-20 2020-03-21 2020-05-13 2020-04-20 2020-07-08 2020-05-25 2020-08-28 r Adi Nebried Town. nvelope 4 H) Implementing Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-151608-C W-RFB / Expansion of water s Urban Water Supply, Sanitati Single Stage - One E Under Imple 2020-09-2 upply system at Nebelet tow IDA / 64450 on, and Hygiene (Urban WAS Post Request for Bids Open - National 265,000.00 0.00 2020-02-12 2020-04-16 2020-02-27 2020-03-28 2020-05-15 2020-04-27 2020-06-01 nvelope mentation 9 n. H) Implimenting Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-151627-C W-RFB / Construction of RPS (Civil work construction , sup ply and installation of Pipes a Rural Water Supply, Sanitati Single Stage - One E Under Imple 2021-04-0 nd Fittings and electromech IDA / 64450 on, and Hygiene (Rural WAS Post Request for Bids Open - National 361,566.00 0.00 2020-02-24 2020-05-19 2020-03-10 2020-04-21 2020-06-23 2020-05-21 2020-07-01 nvelope mentation 7 anical equipment) at Kilite A H) wlealo Woreda (Dinwale Vill age) Implementing Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-151638-C W-RFB / Drilling and pumping test of Five Deep borehole fo Rural Water Supply, Sanitati r (Laelay Maychew #1, Laela Single Stage - One E 2020-09-1 IDA / 64450 on, and Hygiene (Rural WAS Post Request for Bids Open - National 250,000.00 0.00 Signed 2020-02-14 2020-04-10 2020-02-29 2020-04-11 2020-05-20 2020-05-11 2020-07-08 2020-06-21 y Adiyabo #1 , hintalo wojera nvelope 9 H) t (Gonka) #1,Tsegede #1 an d Welkait#1) Implementing Agency-Tigray Water Resource Bureau ET-TIGRAY WRDB-155368-C W-RFB / Drilling of shallow w ells and supply and installati on of Afredeve hand pump at Rural Water Supply, Sanitati lot-1 Atsbi Wonberta and ofla Single Stage - One E 2020-11-1 IDA / 64450 on, and Hygiene (Rural WAS Post Request for Bids Open - National 169,800.00 0.00 Signed 2020-03-28 2020-04-08 2020-04-12 2020-05-12 2020-05-08 2020-06-11 2020-07-07 2020-07-16 2020-08-17 woredas #10Shallow wells nvelope 3 H) lot-2Welkayit woreda #10 sh allow wells lot-3Tsegede Woreda#10SW Implementing Agency- Tigray Water Resource Bureau ET-TIGRAY WRDB-151601-C W-RFB / Civil work constructi on with supply and installati Urban Water Supply, Sanitati Single Stage - One E Under Imple 2021-06-1 on of Pipes ,Fittings and elec IDA / 64450 on, and Hygiene (Urban WAS Post Request for Bids Open - National 1,000,000.00 0.00 2020-02-07 2020-04-01 2020-02-25 2020-03-26 2020-05-07 2020-05-05 2020-06-15 nvelope mentation 5 tromechanical equipments) f H) or Wukro Maray Town. Implementing Agency- Tigra y Water Resource Bureau ET-TIGRAY WRDB-232293-C National Procure W-DIR / Construction of WSS Urban Water Supply, Sanitati ment Document - 2022-02-1 including supply and installat IDA / 64450 on, and Hygiene (Urban WAS Post Direct Selection Direct 1 Envelope proce 1,575,000.00 0.00 Canceled 2021-04-30 2021-05-05 2021-05-22 6 ion of pipes and fittings and H) ss (Non Bank-SPD EME for Chercher Town by Ti ) gray WRDB National Procure ET-TIGRAY WRDB-232299-C Rural Water Supply, Sanitati ment Document - W-DIR / Drilling of 30 shallow 2021-09-1 IDA / 64450 on, and Hygiene (Rural WAS Post Direct Selection Direct 1 Envelope proce 225,400.00 0.00 Canceled 2021-04-30 2021-05-05 2021-05-22 wells including supply & insta 9 H) ss (Non Bank-SPD llation of hand pump in 4 lots ) by Tigray RWB ET-TIGRAY WRDB-389307-C National Procure W-DIR / Drilling of shallow we Rural Water Supply, Sanitati ment Document - lls with supply and installatio 2024-04-2 IDA / 64450 on, and Hygiene (Rural WAS Post Direct Selection Direct - National 1 Envelope proce 398,300.00 0.00 Signed 2023-11-30 2023-11-02 2023-12-05 2023-12-06 2024-02-20 2024-01-31 n of Afredeve hand pump at 0 H) ss (Non Bank-SPD different woredas of Tigray,B ) y Tigray Water and Energy B ureau ET-TIGRAY WRDB-232288-C National Procure W-DIR / Procurement of Civil Rural Water Supply, Sanitati ment Document - Work Construction including 2024-07-1 IDA / 64450 on, and Hygiene (Rural WAS Post Direct Selection Direct - National 1 Envelope proce 1,274,562.00 0.00 Signed 2023-11-30 2023-09-26 2023-12-05 2023-12-15 2024-02-13 2024-01-30 supply and Installation of Pip 2 H) ss (Non Bank-SPD es and Fittings and EME for D ) inwale village WSP , by Tigra y Water and Energy Bureau National Procure ET-TIGRAY WRDB-389309-C Rural Water Supply, Sanitati ment Document - W-DIR / Drilling and pumping 2024-04-2 IDA / 64450 on, and Hygiene (Rural WAS Post Direct Selection Direct - National 1 Envelope proce 212,427.00 0.00 Signed 2023-11-30 2023-11-02 2023-12-05 2023-12-06 2024-02-20 2024-01-31 test of Deep wells at differen 0 H) ss (Non Bank-SPD t woreds of Tigray,By Tigray ) Water and Energy Bureau ET-TIGRAY WRDB-232292-C National Procure W-DIR / Procuremnt of Civil Urban Water Supply, Sanitati ment Document - Work Construction including 2024-09-1 IDA / 64450 on, and Hygiene (Urban WAS Post Direct Selection Direct - National 1 Envelope proce 2,389,804.00 0.00 Signed 2023-11-06 2024-01-05 2023-11-11 2023-12-15 2023-12-31 2024-02-02 supply and Installation of Pip 6 H) ss (Non Bank-SPD es and Fittings and EME for ) Wukro Maray Town WSP, by Tigray Water and Energy Bur eau Page 1 ET-TIGRAY WRDB-395050-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement for Mai Request for Quota Single Stage - One E Pending Imp 2024-05-1 IDA / 64450 anitation, and Hygiene (Insti Post Limited tions (Non Bank-S 7,966.00 0.00 2023-12-20 2024-02-14 ntenance of WaSH facilities i tions nvelope lementation 4 tutional WASH) PD) n Education Bureau ,By Educ ation Bureau ET-TIGRAY WRDB-232291-C National Procure W-DIR / Procurement of Civil Urban Water Supply, Sanitati ment Document - Work Construction including 2024-07-2 IDA / 64450 on, and Hygiene (Urban WAS Post Direct Selection Direct - National 1 Envelope proce 1,239,157.00 0.00 Signed 2023-12-15 2024-01-05 2023-12-20 2024-01-02 2024-02-29 2024-02-21 supply and Installation of Pip 8 H) ss (Non Bank-SPD es and Fittings and EME for A ) di Daero Town WSP ,By Tigr ay Water and Energy Bureau ET-TIGRAY WRDB-400490-C W-RFQ / Procurement for Re Institutional Water Supply, S Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-05-1 habilitation & maintenance o IDA / 64450 anitation, and Hygiene (Insti Post Limited tions (Non Bank-S 23,636.00 0.00 2024-01-15 2024-03-11 tions nvelope lementation 0 f health Bureau latrine with h tutional WASH) PD) and washing facilities, by He alth Bureau ET-TIGRAY WRDB-400626-C W-RFQ / Procurement of Con struction of :One (1)new impr oved latrine with hand washi Rural Water Supply, Sanitati Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-05-3 ng facilities, One (1)New Inci IDA / 64450 on, and Hygiene (Rural WAS Post Limited tions (Non Bank-S 362,727.00 0.00 2024-02-05 2024-04-01 tions nvelope lementation 1 nerators with Ash pit, One ( H) PD) 1) new placenta pit for Healt h Institutions HC/HP and Reh abilitation & maintenance ,by Respective woreda health off ices ET-TIGRAY WRDB-405921-C W-RFQ / Procurement for Ma Rural Water Supply, Sanitati Request for Quota intenance of Water points /s Request for Quota Single Stage - One E Pending Imp 2024-07-3 IDA / 64450 on, and Hygiene (Rural WAS Post Open - National tions (Non Bank-S 87,272.00 0.00 2024-02-25 2024-05-01 chemes @ schools found at d tions nvelope lementation 0 H) PD) ifferent woredas of Tigray, By Educational offices of respect ive woredas ET-TIGRAY WRDB-405922-C W-RFQ / Procurement for Mai Rural Water Supply, Sanitati Request for Quota ntenance of toilets /hand was Request for Quota Single Stage - One E Pending Imp 2024-08-0 IDA / 64450 on, and Hygiene (Rural WAS Post Open - National tions (Non Bank-S 109,090.00 0.00 2024-02-25 2024-05-06 hing facilities at different sch tions nvelope lementation 4 H) PD) ools found at Woredas of Tigr ay, By Educational Offices of Respective woredas ET-TIGRAY WRDB-412404-C W-RFB / Procurement of Civil Request for Bids - Urban Water Supply, Sanitati work construction, supply of Single Stage - One E Small Works SPD Under Imple 2025-07-0 IDA / 64450 on, and Hygiene (Urban WAS Post Request for Bids Open - National 3,000,000.00 0.00 2024-03-22 2024-03-26 2024-03-29 2024-05-02 2024-04-28 2024-05-28 2024-07-02 pipes and fittings and electro nvelope (1 envelope proce mentation 2 H) mechanical equipment for ch ss) ercher Town WSP by Tigray Water and Energy Bureau ET-TIGRAY WRDB-412411-C Request for Bids - W-RFB / Procurement for Exp Urban Water Supply, Sanitati Single Stage - One E Small Works SPD Pending Imp 2024-12-2 ansion of water supply syste IDA / 64450 on, and Hygiene (Urban WAS Post Request for Bids Open - National 1,000,000.00 0.00 2024-03-22 2024-03-29 2024-04-28 2024-06-17 2024-07-29 nvelope (1 envelope proce lementation 6 m for Nebelet Town by Tigra H) ss) y Water and Energy Bureau ET-TIGRAY WRDB-413188-C W-DIR / Procurement of Drilli Rural Water Supply, Sanitati ng of shallow wells with supp Other (with field f Under Imple 2024-10-0 IDA / 64450 on, and Hygiene (Rural WAS Post Direct Selection Direct - National 250,000.00 0.00 2024-03-22 2023-11-02 2024-03-29 2024-03-22 2024-06-02 ly and Installation of Afredev or explanation) mentation 5 H) e Hand Pump at different wor edas of Tigray by Tigray wat er and Energy Bureau ET-TIGRAY WRDB-413844-C W-RFB / procurement of Drilli Request for Bids - Rural Water Supply, Sanitati ng of shallow wells with supp Single Stage - One E Small Works SPD Under Imple 2025-01-0 IDA / 64450 on, and Hygiene (Rural WAS Post Request for Bids Limited - National 300,000.00 0.00 2024-03-29 2024-04-07 2024-04-12 2024-05-12 2024-07-01 2024-08-05 ly and installation of Afredev nvelope (1 envelope proce mentation 2 H) e Hand pump at different wor ss) eda of Tigray By Tigray Wate r and Energy Bureau ET-TIGRAY WRDB-425515-C Institutional Water Supply, S Request for Quota Request for Quota Single Stage - One E Pending Imp 2024-11-2 W-RFQ / Procurement of Heal IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 tions nvelope lementation 7 th facilities Raya Azebo Wor tutional WASH) PD) eda Health office ET-TIGRAY WRDB-425519-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement of Heal Request for Quota Single Stage - One E Pending Imp 2024-11-2 IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 th Facility Construction ,By Si tions nvelope lementation 7 tutional WASH) PD) lewa Woreda Health office ET-TIGRAY WRDB-425522-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement of heal Request for Quota Single Stage - One E Pending Imp 2024-11-2 IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 th facility Construction ,By A tions nvelope lementation 7 tutional WASH) PD) tsibi Woreda Health Office ET-TIGRAY WRDB-425524-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement of heal Request for Quota Single Stage - One E Pending Imp 2024-11-2 IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 th facility Construction, By S tions nvelope lementation 7 tutional WASH) PD) ubha Sasie Woreda Health of fice ET-TIGRAY WRDB-425526-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement of heal Request for Quota Single Stage - One E Pending Imp 2024-11-2 IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 th facility Construction, By G tions nvelope lementation 7 tutional WASH) PD) ulomekeda Woreda health off ice ET-TIGRAY WRDB-425529-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement of heal Request for Quota Single Stage - One E Pending Imp 2024-11-2 IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 th facilities construction, By tions nvelope lementation 7 tutional WASH) PD) Chila Woreda Health office ET-TIGRAY WRDB-425534-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement of heal Request for Quota Single Stage - One E Pending Imp 2024-11-2 IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 th facility construction, By La tions nvelope lementation 7 tutional WASH) PD) elay Maychew Woreda health office ET-TIGRAY WRDB-425537-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement of heal Request for Quota Single Stage - One E Pending Imp 2024-11-2 IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 th facilities construction, By tions nvelope lementation 7 tutional WASH) PD) Naeder Woreda health office ET-TIGRAY WRDB-425538-C Institutional Water Supply, S Request for Quota W-RFQ / Procurement of heal Request for Quota Single Stage - One E Pending Imp 2024-11-2 IDA / 64450 anitation, and Hygiene (Insti Post Limited - National tions (Non Bank-S 27,727.00 0.00 2024-06-06 2024-08-29 th facility Construction ,By As tions nvelope lementation 7 tutional WASH) PD) gede Woreda health office Page 2 ET-TIGRAY WRDB-413239-C National Procure W-DIR / Procurement of Drilli Institutional Water Supply, S ment Document - ng of shallow wells with supp Pending Imp 2024-09-2 IDA / 64450 anitation, and Hygiene (Insti Post Direct Selection Direct - National 1 Envelope proce 200,000.00 0.00 2024-03-22 2024-04-06 2024-06-17 ly and installation of Afredev lementation 5 tutional WASH) ss (Non Bank-SPD e Hand Pump at different sch ) ools of Tigray by Tigray Wate r and Energy Bureau GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-TIGRAY WRDB-232298-G Urban Water Supply, Sanitati O-DIR / Procurement of 7 gen Pending Impl IDA / 64450 on, and Hygiene (Urban WAS Post Direct Selection Direct 386,400.00 0.00 2021-04-30 2021-05-05 2021-06-09 2021-09-07 erator and 6 pumps and 3 sw ementation H) itch boards by Tigray Water Resources Bureau ET-TIGRAY WRDB-389617-G O-RFB / Procurement of Wate Institutional Strengthening a Single Stage - One E Under Imple r Well Selection and Surveyin IDA / 64450 Post Request for Bids Open - National 120,146.00 0.00 2023-11-15 2023-12-26 2023-11-20 2024-01-01 2024-01-31 2024-03-06 2024-04-15 nd Project Management nvelope mentation g Equipments for PMU,by Tig ray Water and Energy Burea u ET-TIGRAY WRDB-389625-G O-RFB / Procurement of Afred Rural Water Supply, Sanitati Single Stage - One E Under Imple eve Hand pump for Different IDA / 64450 on, and Hygiene (Rural WAS Post Request for Bids Open - National 283,236.00 0.00 2023-11-08 2023-12-11 2023-11-13 2023-12-25 2024-01-09 2024-01-24 2024-02-28 2024-03-29 nvelope mentation woredas of Tigray,by Tigray H) Water and Energy Bureau ET-TIGRAY WRDB-389627-G Rural Water Supply, Sanitati O-RFB / Procurement of offic Single Stage - One E Under Imple IDA / 64450 on, and Hygiene (Rural WAS Post Request for Bids Open - National 171,334.00 0.00 2023-11-09 2024-01-12 2023-11-14 2023-12-26 2024-01-25 2024-02-29 2024-04-14 e Furnitures for PMU,Coordin nvelope mentation H) ation office and Woredas ET-TIGRAY WRDB-389637-G Rural Water Supply, Sanitati O-RFB / Procurement of Offic Single Stage - One E Under Imple IDA / 64450 on, and Hygiene (Rural WAS Post Request for Bids Open - National 127,983.00 0.00 2023-11-09 2023-12-19 2023-11-14 2023-12-26 2024-01-17 2024-01-25 2024-02-29 2024-03-30 e Equipments for PMU,Coordi nvelope mentation H) antion office,woreda and sm all towns ET-TIGRAY WRDB-395046-G O-RFQ / Procurement of Tyre Institutional Strengthening a Request for Quota Single Stage - One E IDA / 64450 Post Limited 18,587.00 0.00 Signed 2023-12-10 2024-01-16 2024-02-04 2024-01-29 2024-03-05 for cars of the PMU,by Tigray nd Project Management tions nvelope Water and Energy Bureau ET-TIGRAY WRDB-395049-G O-RFQ / Procurement of offic Institutional Strengthening a Request for Quota Single Stage - One E Pending Impl IDA / 64450 Post Limited 45,318.00 0.00 2023-12-20 2024-02-14 2024-03-15 e equipments for PMU and W nd Project Management tions nvelope ementation oreda by,Tigray Education Bu reau ET-TIGRAY WRDB-400556-G O-RFQ / Procurement of offic Rural Water Supply, Sanitati e equipment's for Regional H Request for Quota Single Stage - One E Pending Impl IDA / 64450 on, and Hygiene (Rural WAS Post Limited 85,909.00 0.00 2024-01-15 2024-03-11 2024-04-10 ealth PMU, Woreda Health off tions nvelope ementation H) ices and Small Towns Health offices, By Tigray Health Bur eau ET-TIGRAY WRDB-413187-G Rural Water Supply, Sanitati O-RFQ / Procurement of offic Request for Quota Single Stage - One E Pending Impl IDA / 64450 on, and Hygiene (Rural WAS Post Open - National 23,636.60 0.00 2024-03-28 2024-07-14 2024-08-13 e furniture for small towns an tions nvelope ementation H) d woreda by Tigray Health B ureau ET-TIGRAY WRDB-424585-G Rural Water Supply, Sanitati O-RFB / procurement of offic Single Stage - One E Pending Impl IDA / 64450 on, and Hygiene (Rural WAS Post Request for Bids Open - National 117,000.00 0.00 2024-06-10 2024-06-20 2024-08-29 2024-09-28 2024-11-02 2024-12-02 e equipment, By Tigray Wate nvelope ementation H) r and Energy Bureau NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-TIGRAY WRDB-155393-C S-INDV / Selection and Emplo Institutional Strengthening a Individual Consult Under Implement yment of Regional WASH Assi IDA / 64450 Post Open 7,000.00 0.00 2020-02-20 2020-03-26 2020-04-09 2020-04-30 2020-06-04 2021-06-04 nd Project Management ant Selection ation stant coordinator by Tigray Water Resource Bureau. ET-TIGRAY WRDB-155455-C S-INDV / Recruitment of Moni Institutional Strengthening a Individual Consult Under Implement IDA / 64450 Post Open 5,500.00 0.00 2020-02-20 2020-03-26 2020-04-09 2020-04-30 2020-06-04 2021-06-04 toring and Evaluation Special nd Project Management ant Selection ation ist by Tigray Water Resource Bureau. ET-TIGRAY WRDB-155465-C S-INDV / Recuitement of Elec Institutional Strengthening a Individual Consult Under Implement IDA / 64450 Post Open 6,750.00 0.00 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2021-06-04 tromechanical Specialist by T nd Project Management ant Selection ation igray Water Resource Bureau ET-TIGRAY WRDB-155475-C S-INDV / Recruitment of Tech Institutional Strengthening a Individual Consult IDA / 64450 Post Open 6,750.00 0.00 Canceled 2020-02-20 2020-04-09 2020-04-30 2020-06-04 2021-06-04 nical Specialist (Engineer) by nd Project Management ant Selection Tigray Water Resource Burea u Page 3 ET-TIGRAY WRDB-155461-C S-INDV / Recruitment of Proc Institutional Strengthening a Individual Consult IDA / 64450 Prior Open 30,000.00 0.00 Canceled 2020-04-20 2020-06-08 2020-06-29 2020-08-03 2023-08-03 urement specialist by Tigray nd Project Management ant Selection Water Resource Bureau. ET-TIGRAY WRDB-191553-C S-INDV / Recuitment of procu Institutional Strengthening a Individual Consult Under Implement IDA / 64450 Prior Open 30,000.00 0.00 2020-09-12 2020-10-31 2020-11-21 2020-12-26 2023-12-26 rement specialist by Tigray nd Project Management ant Selection ation Water Resource Bureau ET-TIGRAY WRDB-191557-C S-INDV / Recuitemnet of tech Institutional Strengthening a Individual Consult Under Implement IDA / 64450 Post Open 6,850.00 0.00 2020-09-12 2020-04-10 2020-10-31 2020-06-16 2020-11-21 2020-12-26 2021-12-26 nical specialist (Engineer) by nd Project Management ant Selection ation Tigray Water Resource Burea u ET-TIGRAY WRDB-232308-C Institutional Strengthening a Individual Consult Pending Impleme S-INDV / Recruitment of Tech IDA / 64450 Post Limited 7,000.00 0.00 2021-05-05 2021-05-10 2021-05-25 2021-06-25 2022-06-25 nd Project Management ant Selection ntation nical Specialist (Engineer) by Tigray WRB ET-TIGRAY WRDB-232310-C Institutional Strengthening a Individual Consult S-INDV / Recruitment of Soci IDA / 64450 Post Limited 7,000.00 0.00 Canceled 2021-05-05 2021-05-10 2021-05-31 2021-07-05 2022-07-05 nd Project Management ant Selection al Safeguard by Tigray WRB ET-TIGRAY WRDB-232311-C Institutional Strengthening a Individual Consult S-INDV / Recruitment of Proc IDA / 64450 Post Limited 30,000.00 0.00 Canceled 2021-05-05 2021-05-10 2021-05-31 2021-07-05 2022-07-05 nd Project Management ant Selection urement specialist by Tigray WRB ET-TIGRAY WRDB-388030-C S-INDV / Selection and Emplo Institutional Strengthening a Individual Consult Under Implement yment of #1 Social Safeguar IDA / 64450 Post Open - National 6,755.00 0.00 2023-11-06 2023-11-23 2023-12-27 2024-01-03 2024-01-22 2025-01-21 nd Project Management ant Selection ation d Specialist for PMU, by Tigra y Water and Energy Bureau ET-TIGRAY WRDB-388081-C S-INDV / Selection and Emplo Institutional Strengthening a Individual Consult Under Implement yment of #1 Procurement sp IDA / 64450 Prior Open - National 6,755.00 0.00 2023-11-06 2023-12-20 2023-12-27 2024-01-03 2024-01-22 2025-01-21 nd Project Management ant Selection ation ecialist for PMU,by Tigray wa ter and energy Bureau ET-TIGRAY WRDB-388083-C S-INDV / Selection and Emplo Institutional Strengthening a Individual Consult Under Implement yment of #2 Technical Speci IDA / 64450 Post Open - National 13,510.00 0.00 2023-11-02 2023-11-23 2023-12-23 2023-12-30 2024-01-18 2025-01-17 nd Project Management ant Selection ation alist (Engineers) for PMU, by Tigray Water and Energy Bu reau Page 4