PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Mali : Mali Electricity Sector Improvement Project (MESIP) PLAN General Information Country: Mali 2020-03-16 Bank’s Approval Date of the Original Procurement Plan: 2024-05-28 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P166796 GPN Date: 2020-04-24 Project Name: Mali Electricity Sector Improvement Project (MESIP) Loan / Credit No: IDA / 53560, IDA / 64570, IDA / D4960 Mali - Malian Electricity Sector Improvment Project Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CW-REF-03 / Travaux de Cloi Component 4 - Operational s Single Stage - One E 2021-02-2 IDA / D4960 A posteriori Demande de prix Limited 26,000.00 14,937.10 Signé 2020-12-23 2021-03-02 2021-01-30 2021-06-04 ssonnement des bureaux de l upport nvelope 7 'UGP CW-REF-05 / Travaux de F/I et mise en service éqpts et o uvrages travées transfo 150 Component 1- Improvement kV de puissance 60 MVA - 15 Open - Internationa Single Stage - One E 18,976,068.0 26,872,972. 2022-04-2 IDA / 64570 and expansion of transmissi A priori Appel d'offres Signé 2021-03-15 2021-03-24 2021-03-20 2021-05-01 2021-05-10 2021-05-21 2022-01-18 2021-06-25 2022-04-13 0 / 15 kV et cellules dans les l nvelope 0 93 1 on and distribution postes (1 lafia, 2 sirakoro, 1 balingué, 2 kalaban) ds le ca dre de la réhabilitation/renfor cement/rénovation postes HT B/H CW-REF-07 / Travaux de Fou Demande d'offres Component 1- Improvement rniture Installation et mise en Single Stage - One E - DTPM Petits trav 2,443,612.9 2022-01-3 IDA / 64570 and expansion of transmissi A posteriori Appel d'offres Open - National 1,082,950.00 Signé 2021-05-25 2021-12-28 2021-05-30 2021-12-28 2021-06-29 2021-09-06 2021-07-09 2021-12-29 2021-08-03 2021-12-15 service des cellules et Extens nvelope aux - (Processus à 5 0 on and distribution ion du poste 30/15 Kv poste 1 enveloppe) Badala CW-REF-01 / Travaux de renf Component 1- Improvement orcement réhabilitation et bo Single Stage - One E 2021-11-1 IDA / 64570 and expansion of transmissi A posteriori Appel d'offres Open - National 3,200,000.00 0.00 Annulé 2021-03-05 2021-03-10 2021-04-09 2021-04-19 2021-05-17 uclage des départs HTA 15 k nvelope 3 on and distribution v dans le cadre des activités de 1.4 composante 1 CW-REF-2 / Travaux Constru ction de nouveaux postes HT Component 1- Improvement Single Stage - One E 2020-06-2 /BT et raccordement de 25 0 IDA / 64570 and expansion of transmissi A posteriori Appel d'offres Open - National 3,900,000.00 0.00 Annulé 2020-04-20 2020-04-25 2020-05-25 2020-06-01 2020-06-09 nvelope 1 00 nouveau clients dans le c on and distribution adre de composante 1 CW-REF-04 / Travaux de nor Component 1- Improvement Single Stage - One E 2021-11-2 malisation des postes HTA/B IDA / 64570 and expansion of transmissi A posteriori Appel d'offres Open - National 1,705,009.00 0.00 Annulé 2021-03-17 2021-03-22 2021-04-21 2021-05-06 2021-05-31 nvelope 7 T surchargés on and distribution CW-REF-06 / Travaux de Con Demande d'offres Component 1- Improvement struction pour l’Electrification Single Stage - One E - DTPM Travaux - 7,376,115.7 2022-02-0 IDA / 64570 and expansion of transmissi A posteriori Appel d'offres Open - National 9,000,000.00 Signé 2021-05-24 2021-12-30 2021-05-29 2021-12-29 2021-06-28 2021-08-09 2021-07-13 2021-08-09 2021-08-07 2022-03-14 , la Normalisation et le Renfo nvelope Droit civil français 5 3 on and distribution rcement du réseau HTA-BT à (français) Bamako CW-REF-08 / Fourniture et in stallation des matériels pour Demande de cota Component 1- Improvement l’extension du poste de Sana Passation de marc tions (DTPM ne pr En cours d'e 2022-12-1 IDA / D4960 and expansion of transmissi A posteriori Direct 3,000,000.00 0.00 2022-05-11 2023-06-07 2022-05-16 2023-06-19 2022-06-20 nkoroba dans le cadre du pro hé de gré à gré ovenant pas de la xécution 7 on and distribution jet d’interconnexion électriqu Banque) e en 225 kV GUINEE-MALI (PI EGM) CW-REF-09 / Travaux de réal Demande d'offres Component 1- Improvement isation des Postes et Lignes Open - Internationa Single Stage - One E - DTPM Travaux (s 45,000,000.0 En cours d'e 2024-07-2 IDA / 64570 and expansion of transmissi A priori Appel d'offres 0.00 2023-04-14 2024-01-03 2023-04-19 2024-01-10 2023-06-03 2024-03-01 2023-07-03 2023-07-27 HTB tranche ferme dans le c l nvelope ans préqualificati 0 xamen 1 on and distribution adre de la composante 1 du on) PASEM GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual GO-REF-01 / Acquisition/Four Component 2- Capacity stre Single Stage - One E niture de véhicules de détect IDA / D4960 ngthening and technical assi A posteriori Appel d'offres Open - National 1,000,000.00 525,393.00 Signé 2020-04-20 2020-09-01 2020-04-25 2021-04-10 2020-05-25 2020-09-24 2020-06-04 2021-01-15 2020-06-06 2021-03-10 2020-12-03 nvelope ion de défauts souterrains stance GO-REF-05 / Fourniture et in stallation d'un poste de repor t Conteneurisé/mobile compo Component 1- Improvement Single Stage - One E sé de cellules 15 kV dans le IDA / 64570 and expansion of transmissi A posteriori Appel d'offres Open - National 3,000,000.00 1,433,989.56 Signé 2020-04-16 2021-01-06 2020-04-21 2022-08-18 2020-05-21 2021-02-22 2020-05-26 2021-03-19 2020-06-19 2021-08-22 2020-12-16 nvelope cadre des travaux de rehabili on and distribution tation, renforcement et reno vation des postes 150 / 15 k V (Balingué, Lafia, Kalaban et Sirakoro) GO-REF-07 / Acquisition Outi l de mesure de surface Carto Component 4 - Operational s Single Stage - One E IDA / D4960 A posteriori Demande de prix Open - National 4,000.00 0.00 Annulé 2020-05-30 2020-07-30 2020-10-28 graphie Exploitation de donn upport nvelope ées géospatiales pour l'UEP GO-REF-08 / Acquisition Outi ls d'analyse et de planificatio Component 4 - Operational s Single Stage - One E IDA / D4960 A posteriori Demande de prix Limited 10,000.00 0.00 Annulé 2020-04-25 2020-05-25 2020-05-28 n SIG upport nvelope Modélisation et gestion des d onnées (6 utilisateurs) pour l' UEP GO-REF-09 / Acquisition logi ciel et equipement pour la m Component 2- Capacity stre Single Stage - One E ise en place d’un Système d’I IDA / D4960 ngthening and technical assi A posteriori Appel d'offres Open - National 700,000.00 577,514.50 Signé 2020-03-31 2020-08-20 2020-04-05 2021-04-13 2020-05-05 2020-09-23 2020-05-12 2020-12-15 2020-06-05 2021-03-30 2020-09-03 nvelope nformation de Gestion de Co stance ntenu de l’Entreprise (SI-ECM ) GO-REF-10 / Acquisition de g roupe électrogène de 50 KVA Component 4 - Operational s Single Stage - One E IDA / D4960 A posteriori Demande de prix Limited 35,000.00 29,248.18 Signé 2020-04-06 2022-01-26 2020-05-12 2021-02-20 2020-05-15 et aménagement du local gro upport nvelope upe pour l’UEP du PASEM GO-REF-12 / Acquisition de Component 4 - Operational s Single Stage - One E mobiliers de Bureaux pour l’ IDA / D4960 A posteriori Demande de prix Limited 60,000.00 77,345.08 Signé 2020-03-30 2022-01-26 2020-05-12 2020-07-28 2020-06-11 upport nvelope UEP du PASEM Page 1 GO-REF-15 / Fourniture Com Component 4 - Operational s Single Stage - One E sommables de Bureau pour l’ IDA / D4960 A posteriori Demande de prix Limited 20,000.00 15,833.51 Signé 2020-03-25 2020-11-19 2020-05-01 2021-02-20 2020-05-31 upport nvelope UEP du PASEM GO-REF-11 / Acq de matériel s informatiques (ordinateurs 2 en 1, PC, ordinateurs de b Component 4 - Operational s Single Stage - One E ureau, imprimantes multifon IDA / D4960 A posteriori Demande de prix Limited 100,000.00 69,018.34 Signé 2020-03-30 2020-05-07 2020-05-18 2020-07-28 2020-07-02 upport nvelope ction couleur, imprimantes multifonction Noir/Blanc, copi eur GF, vidéo projecteur) po ur l’UEP du PASEM NC-REF-06 / Activités de Co Component 4 - Operational s Single Stage - One E mmunication (sensilisation, d IDA / D4960 A posteriori Demande de prix Limited 30,000.00 34,948.70 Signé 2020-03-29 2021-02-15 2020-05-09 2021-06-14 2020-05-12 upport nvelope ifussion, supports de commu nication) GO-REF-02 / Acquisition/Four Component 2- Capacity stre niture d'outils, d'équipement Single Stage - One E En cours d'ex IDA / D4960 ngthening and technical assi A posteriori Appel d'offres Open - National 1,500,000.00 0.00 2020-08-30 2021-01-06 2020-09-04 2021-04-13 2020-09-07 2021-02-18 2020-09-17 2021-03-12 2020-10-17 2021-04-15 s de sécurité et d'exploitatio nvelope écution stance n / maintenance et Palan mo bile de 5 tonnes GO-REF-20 / Fourniture de m Component 2- Capacity stre Single Stage - One E En cours d'ex atériels informatiques pour le IDA / 64570 ngthening and technical assi A posteriori Demande de prix Limited 60,000.00 0.00 2020-07-14 2023-07-27 2020-09-06 2020-10-06 nvelope écution Ministère de Energie et de Ea stance u GO-REF-04 / Fourniture insta llation et mise en service de t Component 1- Improvement Single Stage - One E ransformateurs de puissance IDA / 64570 and expansion of transmissi A priori Appel d'offres Open - National 6,500,000.00 0.00 Annulé 2020-03-25 2020-03-30 2020-04-29 2020-04-30 2020-05-30 2020-11-26 nvelope 60 MVA - 150 / 15 kV (1 lafia, on and distribution 1 sirakoro, 1 balingué, 2 kala ban) GO-REF-14 / Acquisition et a Component 4 - Operational s Single Stage - One E ménagement de la salle en vi IDA / D4960 A posteriori Demande de prix Limited 40,000.00 42,929.04 Signé 2020-04-19 2020-12-08 2020-05-28 2021-03-20 2020-07-12 upport nvelope deo conference plus TV de pr ojetction Ecran GO-REF-16 / Acquisition de 1 véhicule 4X4 Station Wagon Component 4 - Operational s Single Stage - One E IDA / D4960 A posteriori Appel d'offres Open - National 540,000.00 521,230.89 Signé 2020-07-23 2020-07-18 2020-07-28 2022-03-09 2020-08-27 2020-12-03 2020-09-06 2021-01-28 2020-10-04 2021-03-29 2020-12-03 et de 9 véhicules 4X4 Pick up upport nvelope pour le suivi du projet GO-REF-06 / Fourniture l’inst allation et la mise en service Component 1- Improvement de transformateurs 150/15 k Open - Internationa Single Stage - One E IDA / 64570 and expansion of transmissi A priori Appel d'offres 9,100,000.00 0.00 Annulé 2020-07-30 2020-08-04 2020-09-18 2020-09-28 2020-10-26 2021-04-24 V 60 MVA avec les equipeme l nvelope on and distribution nts de travées dans les poste s de 1 Balingue 1 Sirakoro 1 Lafia et 2 Kalaban GO-REF-18 / Acquisition de 3 Component 4 - Operational s Single Stage - One E IDA / D4960 A posteriori Demande de prix Limited 35,000.00 69,150.96 Signé 2020-12-23 2020-12-18 2021-02-10 2021-07-13 2021-03-10 palans électriques mobile de upport nvelope 5 tonnes GO-REF-17 / Acquisition de 2 Component 1- Improvement Open - Internationa Single Stage - One E 5 000 compteurs communica IDA / 64570 and expansion of transmissi A priori Appel d'offres 5,300,000.00 0.00 Annulé 2021-01-11 2021-03-15 2021-01-16 2021-02-27 2021-05-03 2021-03-29 2021-08-23 2021-05-03 2021-08-04 l nvelope nt avec accessoires et kit de on and distribution branchement GO-REF-19 / Fourniture Insta Component 1- Improvement llation et mise en service des Single Stage - One E En cours d'ex IDA / 64570 and expansion of transmissi A posteriori Appel d'offres Open - National 1,851,197.00 0.00 2021-02-15 2023-08-21 2021-02-20 2023-08-21 2021-03-22 2021-09-06 2021-04-06 2023-08-21 2021-05-11 2021-11-07 cellules et Extension du post nvelope écution on and distribution e 30/15 Kv poste Badala GO-REF-21 / F/Inst mise serv ice éqpts ouvrages travées tr ansfo 150 kV puissance 60 M Component 1- Improvement VA - 150 / 15 kV et cellules p Open - Internationa Single Stage - One E IDA / 64570 and expansion of transmissi A priori Appel d'offres 18,976,068.00 0.00 Annulé 2021-02-02 2021-02-07 2021-03-24 2021-04-08 2021-05-03 2021-12-29 ostes (1 lafia, 2 sirakoro, 1 b l nvelope on and distribution alingué, 2 kalaban) dans le c adre de la réhabilitation et re nforcement/rénovation dans l es postes HTB/HTA GO-REF-22 / Fourniture et in Component 1- Improvement stallation de logiciels et form Single Stage - One E En cours d'ex IDA / 64570 and expansion of transmissi A posteriori Appel d'offres Open - National 400,000.00 0.00 2021-02-15 2023-07-19 2021-02-20 2023-07-19 2021-03-22 2023-07-19 2021-04-06 2023-07-25 2021-05-01 2021-10-28 ation à la planification, à l'ex nvelope écution on and distribution ploitation et à la maintenanc e de EDM SA GO-REF-23 / Fourniture et in Component 1- Improvement stallation d’équipements info Single Stage - One E En attente d' IDA / 64570 and expansion of transmissi A posteriori Demande de prix Limited 100,000.00 0.00 2021-03-20 2021-05-15 2021-06-14 rmatiques pour la planificatio nvelope exécution on and distribution n, l'exploitation et la mainten ance de EDM SA GO-REF-24 / Fourniture et in stallation d'équipement en v Component 2- Capacity stre Single Stage - One E En attente d' ue de la réduction de la cons IDA / D4960 ngthening and technical assi A posteriori Appel d'offres Open - National 700,000.00 0.00 2021-03-15 2021-03-20 2021-04-19 2021-05-09 2021-06-08 2021-12-05 nvelope exécution ommation d'électricité du go stance uvernement central et ses en tités GO-REF-25 / Fourniture de lo Component 2- Capacity stre Single Stage - One E En cours d'ex gistique (poids lourds équipé IDA / 64570 ngthening and technical assi A priori Appel d'offres Open - National 2,864,000.00 0.00 2021-03-29 2021-08-11 2021-04-03 2021-04-23 2021-04-27 2021-05-23 2021-08-30 2021-06-27 2021-12-24 nvelope écution s de grues et équipés de nac stance elles) GO-REF-03 / Acquisition de d Component 2- Capacity stre eux (2) Chariots élévateur à f Single Stage - One E IDA / D4960 ngthening and technical assi A posteriori Demande de prix Limited 100,000.00 0.00 Annulé 2020-06-04 2020-07-13 2020-09-11 ourche frontal de 05 à 10 To nvelope stance nnes pour travaux dans les p ostes HTB/HTA GO-REF-26 / Acquisition de d Component 2- Capacity stre eux (2) Chariots élévateur à f Single Stage - One E IDA / 64570 ngthening and technical assi A posteriori Appel d'offres Open - National 300,000.00 0.00 Annulé 2021-06-30 2021-07-05 2021-08-04 2021-08-14 2021-09-07 2021-12-06 ourche frontal de 05 à 10 To nvelope stance nnes pour travaux dans les p ostes HTB/HTA GO-REF-27 / Fourniture d'un Component 2- Capacity stre Chariot élévateur à fourche fr Single Stage - One E IDA / 64570 ngthening and technical assi A posteriori Demande de prix Limited 100,000.00 0.00 Signé 2021-10-20 2023-07-13 2021-11-18 2022-12-20 2022-01-17 ontal de 05 à 10 Tonnes pour nvelope stance travaux dans les postes HTB/ HTA GO-REF-28 / Acquisition des Component 2- Capacity stre Single Stage - One E En cours d'ex Equipements de Protection In IDA / 64570 ngthening and technical assi A posteriori Demande de prix Limited 20,513.00 0.00 2021-12-05 2023-09-13 2022-01-18 2022-03-19 nvelope écution dividuelle (EPI) Pour l'UGP stance GO-REF-29 / Acquisition d'O Component 2- Capacity stre utillages (GPS, Odomètre et Single Stage - One E En cours d'ex IDA / D4960 ngthening and technical assi A posteriori Demande de prix Limited 20,513.00 0.00 2021-12-06 2023-07-14 2022-01-19 2022-03-20 autres), d'appareil de mesure nvelope écution stance , de detection et de contrôle pour l'UGP Page 2 GO-REF-30 / Acquisition de matériels informatiques pour Component 2- Capacity stre la planification, l'exploitation Single Stage - One E En cours d'ex IDA / D4960 ngthening and technical assi A posteriori Demande de prix Limited 100,000.00 0.00 2021-12-07 2023-07-19 2022-01-20 2022-03-21 et à la maintenance de résea nvelope écution stance ux électrique d’EDM-SA et de s matériels informatiques co mplémentaires pour l'UGP GO-REF-31 / Acquisition de Component 4 - Operational s Single Stage - One E En cours d'ex Mobiliers de bureaux complé IDA / D4960 A posteriori Demande de prix Limited 13,675.00 0.00 2021-12-08 2023-07-27 2022-01-21 2022-03-22 upport nvelope écution mentaires pour l'UGP GO-REF-32 / Acquisitions 25 Component 1- Improvement Open - Internationa Single Stage - One E En cours d'ex 000 compteurs avec accesso IDA / 64570 and expansion of transmissi A priori Appel d'offres 5,300,000.00 0.00 2021-12-15 2022-11-10 2021-12-20 2023-01-25 2022-01-31 2022-03-02 2022-03-31 2026-03-10 l nvelope écution ires et Kit de branchement on and distribution GO-REF-33 / Acquisitions out Component 2- Capacity stre illages, équipements de sécu Single Stage - One E En cours d'ex IDA / D4960 ngthening and technical assi A posteriori Appel d'offres Open - National 1,500,000.00 0.00 2021-12-20 2023-08-16 2021-12-25 2023-08-16 2022-02-05 2023-08-16 2022-02-25 2023-08-17 2022-03-26 2022-09-22 rité et d'exploitation/mainten nvelope écution stance ance pour l'EDM-SA GO-REF-34 / fourniture de vé Component 2- Capacity stre hicules d’exploitations tout t Single Stage - One E En cours d'ex IDA / D4960 ngthening and technical assi A posteriori Appel d'offres Open - National 1,100,000.00 0.00 2021-12-15 2023-07-12 2021-12-20 2023-07-12 2022-01-29 2023-07-12 2022-02-18 2023-07-13 2022-03-19 2022-09-15 errain 4x4 Pick up (24 simple nvelope écution stance s cabines et 08 double cabin es) GO-REF-35 / Acquisition/mis Component 2- Capacity stre Single Stage - One E En attente d' IDA / 64570 A posteriori Appel d'offres Open - National 598,291.00 0.00 2024-03-18 2024-03-23 2024-05-02 2024-06-01 2024-07-06 2024-09-04 e en service des équipement ngthening and technical assi nvelope exécution s SI CLIENT stance GO-REF-36 / Fourniture, inst Component 2- Capacity stre allation et mise en service d’ Single Stage - One E En attente d' IDA / 64570 ngthening and technical assi A posteriori Demande de prix Limited - National 52,000.00 0.00 2024-06-09 2024-07-11 2024-08-10 un groupe électrogène de 10 nvelope exécution stance 0 Kva pour le compte de l’UG P/PASEM NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NC-REF-1 / Acquisition/install ation et parametrage d'un lo giciel de comptabilité et de s Component 4 - Operational s Single Stage - One E IDA / D4960 A posteriori Demande de prix Limited 60,000.00 51,987.92 Signé 2020-03-21 2022-01-26 2020-04-27 2020-07-06 2021-04-27 uivi évaluation avec serveur upport nvelope pour le projet PASEM ; format ion des utilisateurs et accom pagnement NC-REF-2 / Câblage réseau i nformatique (30 prises infor Component 4 - Operational s Single Stage - One E matiques) et reseau ondulé ( IDA / D4960 A posteriori Demande de prix Open - National 60,000.00 52,941.10 Signé 2020-05-04 2020-07-04 2020-10-21 2020-12-31 upport nvelope 60 prises ondulées) avec four niture de 1 Onduleur 20 KVA NC-REF-3 / Installation du Co ntrôle d’accès/Pointage biom Component 4 - Operational s Single Stage - One E En cours d'ex IDA / D4960 A posteriori Demande de prix Limited 40,000.00 0.00 2020-05-04 2023-07-27 2020-06-16 2020-07-31 étrique, Vidéosurveillance et upport nvelope écution Fortigat 30E avec licence de 3 ans NC-REF-4 / Services d’Entreti Component 4 - Operational s Single Stage - One E en et nettoyage des locaux IDA / D4960 A posteriori Demande de prix Limited 20,000.00 11,892.89 Signé 2020-03-30 2020-07-22 2020-05-08 2020-10-21 2022-05-08 upport nvelope de l’UEP du PASEM NC-REF-5 / Services de gardi Component 4 - Operational s Single Stage - One E IDA / D4960 A posteriori Demande de prix Limited 10,000.00 6,948.30 Signé 2020-04-15 2020-07-22 2020-05-21 2020-10-21 2021-05-21 ennae des locaux de l’UEP d upport nvelope u PASEM NC-REF-07 / Fourniture et l’i Component 2- Capacity stre nstallation d’un Logiciel d’an Single Stage - One E En cours d'ex IDA / 64570 ngthening and technical assi A posteriori Demande de prix Limited 80,000.00 0.00 2020-07-06 2023-07-27 2020-08-26 2020-12-24 alyse et de planification de r nvelope écution stance éseaux électriques Ministère de l'Énergie et de l'Eau NC-REF-08 / Nettoyage balla yage/entretien des batiments Component 4 - Operational s Single Stage - One E En attente d' , de la piscine et nettoyage d IDA / D4960 A posteriori Demande de prix Limited 17,100.00 0.00 2021-12-05 2022-01-20 2023-01-20 upport nvelope exécution e la Cours avec écvacuation des déchets à l'UGP du PASE M NC-REF-09 / Service entretie n et maintennance des install Component 4 - Operational s Single Stage - One E En attente d' ations de l'UGP (climatisation IDA / 64570 A posteriori Demande de prix Limited 20,500.00 0.00 2021-12-25 2022-02-13 2023-02-08 upport nvelope exécution , reseaux electriques, sanitair es plomberise et reseaux AE P) NC-REF-10 / Service d'entret ien et de reparation avec piè Component 4 - Operational s Single Stage - One E En attente d' IDA / D4960 A posteriori Demande de prix Limited 25,641.00 0.00 2021-12-11 2022-01-28 2023-01-28 ces de rechanges des engins upport nvelope exécution roulants de l'UGP (garage) NC-REF-11 / Acquisition des Component 4 - Operational s Single Stage - One E En cours d'ex IDA / D4960 A posteriori Demande de prix Limited 39,316.00 0.00 2021-11-30 2023-07-19 2022-01-17 2023-01-12 assurances pour les véhicule upport nvelope écution s de l'UGP NC-REF-12 / Service traideur Component 4 - Operational s Single Stage - One E En attente d' (fourniture de nourriture) pou IDA / D4960 A posteriori Demande de prix Limited 25,641.00 0.00 2021-12-13 2022-02-01 2023-01-27 upport nvelope exécution r les commissions au niveau de l'UGP NC-REF-13 / Fourniture et in stallation de matériels de dé Component 4 - Operational s Single Stage - One E IDA / D4960 A posteriori Demande de prix Limited 17,094.00 17,125.73 Signé 2021-12-18 2021-11-09 2022-02-06 2022-01-30 2022-04-07 coration des bureaux de l’UG upport nvelope P/PASEM au niveau de l'UGP NC-REF-14 / Acquisition de L Component 4 - Operational s Single Stage - One E En cours d'ex ogiciels de calcul et de mesu IDA / D4960 A posteriori Demande de prix Limited 56,410.00 0.00 2021-12-21 2023-07-27 2022-02-15 2022-04-16 upport nvelope écution re de surface cartographique pour l'UGP NC-REF-15 / Fourniture et in stallation/aménagement des Component 4 - Operational s Single Stage - One E En cours d'ex IDA / D4960 A posteriori Demande de prix Limited 75,040.00 0.00 2022-07-14 2023-06-07 2022-08-19 2022-10-03 salles de l'EDM SA en matéri upport nvelope écution els de visioconférence et acc essoires NC-REF-16 / Fourniture/Insta Component 2- Capacity stre Single Stage - One E En cours d'ex llation et mise en service du IDA / 64570 ngthening and technical assi A priori Appel d'offres Open - National 2,600,000.00 0.00 2023-02-01 2023-06-06 2023-02-06 2023-12-12 2023-03-18 2024-01-09 2023-04-17 2023-05-08 2023-11-04 nvelope écution Système d'Information client stance de l'EDM SA Page 3 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ML-SHER-79224-CS-CQS / El Component 1: Service impro Sélection fondée s En attente d'exéc aboration d'un PAR du PASE IDA / 53560 vement and extension of exi A posteriori ur les qualification Open - National 92,000.00 0.00 2018-03-16 2018-04-06 2018-05-20 2018-06-19 2018-07-24 2019-01-20 ution MU sting mini-grids s des consultants ML-SHER-79227-CS-QCBS / E Component 1- Improvement Sélection fondée s En cours d'exécut tude de faisabilité du PASEM IDA / 64570 and expansion of transmissi A priori ur la qualité et le Open - National 417,000.00 0.00 2018-11-15 2018-12-27 2018-12-06 2019-01-15 2019-01-19 2019-05-30 2019-02-16 2019-08-20 2019-03-18 2019-08-20 2019-04-22 2020-12-22 2019-05-27 2020-05-26 ion U on and distribution coût ML-SHER-79230-CS-CDS / Et Component 1: Service impro Sélection fondée s En attente d'exéc udes impact environnementa IDA / 53560 vement and extension of exi A posteriori ur les qualification Open - National 92,000.00 0.00 2018-03-15 2018-04-05 2018-05-19 2018-06-18 2018-07-23 2019-01-19 ution les et Sociales du PASEMU sting mini-grids s des consultants CS-REF-02 / Recrutement de consultants pour la préparati Component 2- Capacity stre Sélection fondée s En cours d'exécut on de la réduction de la cons IDA / D4960 ngthening and technical assi A posteriori ur les qualification Open - National 200,000.00 0.00 2020-06-06 2020-06-29 2020-06-21 2023-08-24 2020-07-22 2020-08-06 2020-09-06 2021-03-05 ion ommation d’électricité pour l stance s des consultants e gouvernement central et s es entités CS-REF-06 / Recrutement de Component 2- Capacity stre Sélection fondée s consultants pour la préparati IDA / D4960 ngthening and technical assi A posteriori ur les qualification Open - National 104,000.00 0.00 Annulé 2020-06-05 2020-06-15 2020-07-02 2020-07-12 2020-08-01 2021-01-28 on de l'EIES de la composant stance s des consultants e1 CS-REF-07 / Recrutement de Component 2- Capacity stre Sélection fondée s consultants pour la préparati IDA / D4960 ngthening and technical assi A posteriori ur les qualification Open - National 80,000.00 0.00 Annulé 2020-03-09 2020-03-30 2020-05-13 2020-06-12 2020-07-02 2020-08-31 on du PAR de la composante stance s des consultants 1 CS-REF-10 / Services de con Component 2- Capacity stre Sélection fondée s sultants pour la préparation En cours d'exécut IDA / D4960 ngthening and technical assi A posteriori ur la qualité et le Open - National 400,000.00 0.00 2020-04-30 2020-06-25 2020-05-15 2021-04-10 2020-05-29 2021-01-15 2020-06-26 2023-07-04 2020-07-06 2023-07-04 2020-07-26 2023-07-04 2020-08-15 2020-08-24 de la politique et de la straté ion stance coût gie énergétiques du Mali CS-REF-15 / Recrutement de Component 2- Capacity stre Sélection fondée s consultants pour la préparati IDA / D4960 ngthening and technical assi A posteriori ur les qualification Open - National 400,000.00 0.00 Annulé 2020-06-02 2020-06-07 2020-07-02 2020-07-12 2020-08-01 2021-01-28 on du PAR de la ligne T 225 stance s des consultants kV Ségou - Bamako CS-REF-08 / Recrutement de Component 2- Capacity stre Sélection fondée s consultants pour la préparati En cours d'exécut IDA / D4960 ngthening and technical assi A priori ur la qualité et le Open - National 500,000.00 0.00 2020-04-15 2021-01-20 2020-04-30 2021-02-16 2020-05-17 2021-11-02 2020-06-14 2022-01-05 2020-06-19 2022-04-21 2020-07-13 2022-11-10 2020-08-03 2020-12-31 on des études techniques de ion stance coût la ligne T 225 kV Ségou – Ba mako CS-REF-11 / Services de con Component 2- Capacity stre Sélection fondée s En cours d'exécut sultant pour l'étude et le suiv IDA / D4960 ngthening and technical assi A priori ur les qualification Open - National 500,000.00 0.00 2020-08-03 2021-01-20 2020-08-17 2021-02-16 2020-08-25 2021-06-20 2020-09-09 2020-09-29 2020-11-04 ion i de la mise en œuvre du Dat stance s des consultants aCenter CS-REF-12 / Services de con Component 2- Capacity stre Sélection fondée s En cours d'exame sultant pour l'étude et le suiv IDA / D4960 ngthening and technical assi A priori ur les qualification Open - National 500,000.00 0.00 2020-05-05 2021-01-20 2020-05-20 2021-02-16 2020-06-06 2021-06-20 2020-07-04 2020-07-10 2020-10-08 n i de la mise en œuvre du SI C stance s des consultants lient CS-REF-03 / Recrutement de Component 2- Capacity stre Sélection fondée s consultants pour les études t IDA / D4960 ngthening and technical assi A priori ur la qualité et le Open - National 500,000.00 0.00 Annulé 2020-05-04 2020-05-19 2020-06-17 2020-07-15 2020-07-25 2020-08-24 2020-09-24 2021-03-23 echniques des activités de la stance coût composante 1 CS-REF-01 / Recrutement de Component 2- Capacity stre Sélection fondée s Open - Internationa En cours d'exécut firme pour le suivi et contrôle IDA / D4960 ngthening and technical assi A priori ur la qualité et le 1,000,000.00 0.00 2020-06-30 2021-01-28 2020-07-15 2021-02-16 2020-08-13 2021-08-17 2020-09-10 2021-11-10 2020-09-24 2022-02-09 2020-10-22 2022-10-30 2020-11-26 2021-11-26 l ion des travaux de la composant stance coût e1 CS-REF-09 / Recrutement de Component 2- Capacity stre Sélection fondée s consultants pour la préparati Open - Internationa En cours d'exécut IDA / D4960 ngthening and technical assi A priori ur la qualité et le 1,000,000.00 0.00 2020-07-15 2020-10-13 2020-07-30 2021-02-19 2020-08-15 2021-08-17 2020-09-12 2021-10-05 2020-09-27 2022-02-08 2020-10-26 2022-10-14 2020-11-30 2021-11-30 on de l'EIES et du PAR de la li l ion stance coût gne T 225 kV Ségou - Bamak o CS-REF-14 / Recrutement de Sélection fondée s Component 4 - Operational s Consultants chargés de l'Aud IDA / D4960 A posteriori ur les qualification Open - National 60,000.00 52,548.60 Signé 2020-06-14 2021-01-18 2020-06-29 2021-04-15 2020-07-19 2021-03-10 2020-07-29 2021-03-30 2020-08-18 2021-06-06 2023-08-18 upport it externe des exercices 202 s des consultants 0, 2021 et 2022 CS-REF-16 / Recrutement de Sélection fondée s Consultants chargés de l'audi Component 4 - Operational s Open - Internationa En cours d'exécut IDA / D4960 A posteriori ur les qualification 350,000.00 0.00 2021-01-12 2021-01-26 2021-02-02 2022-02-04 2021-02-26 2023-09-13 2021-03-28 2023-09-20 2021-04-30 2022-04-30 t technique annuel (Agent vé upport l ion s des consultants rificateur Indépendant) à l'UE P du PASEM CS-REF-20 / recrutement co Sélection fondée s nsultant pour la préparation Component 4 - Operational s IDA / D4960 A posteriori ur la qualité et le Open - National 300,000.00 0.00 Annulé 2021-03-22 2021-03-19 2021-04-06 2021-05-05 2021-06-02 2021-06-17 2021-07-12 2021-08-16 2022-02-12 du programme national d’am upport coût élioration de l’accès a l’électr icité au Mali CS-REF-21 / recrutement co Component 2- Capacity stre Sélection fondée s nsultant pour la préparation Open - Internationa En cours d'exécut IDA / 64570 ngthening and technical assi A posteriori ur les qualification 300,000.00 0.00 2021-03-25 2021-03-19 2021-03-26 2021-03-29 2021-04-29 2023-09-08 2021-05-14 2021-06-18 2021-12-15 du programme national d’am l ion stance s des consultants élioration de l’accès a l’électr icité au Mali CS-REF-30 / Recrutement de Sélection fondée s Component 4 - Operational s Open - Internationa En cours d'exécut Consultants chargés de l'Aud IDA / D4960 A posteriori ur les qualification 60,000.00 0.00 2023-11-01 2023-11-16 2023-12-15 2023-12-30 2024-02-03 2024-03-10 upport l ion it externe des exercices 202 s des consultants 3, 2024 et 2025 ML-SHER-52819-CS-QCBS / E Component 3: Project Manag Sélection fondée s laboration Manuel d’exécutio IDA / 53560 ement Support and Capacity A posteriori ur la qualité et le Open - National 55,000.00 0.00 Annulé 2018-03-30 2018-04-20 2018-06-03 2018-07-01 2018-07-31 2018-09-04 2018-10-09 2019-01-17 n PASEMU Building coût INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CS-REF-13 / Recrutement de Consultants chargés de l'audi Component 4 - Operational s IDA / D4960 A posteriori Individuel Open 100,000.00 0.00 Annulé 2020-06-02 2020-06-18 2020-07-02 2020-07-22 2024-07-21 t technique annuel (verificate upport ur) à l'UEP du PASEM CS-REF-17 / Recrutement du Component 4 - Operational s En attente d'exéc spécialiste en sauvegarde en IDA / D4960 A posteriori Individuel Open 190,000.00 0.00 2020-12-22 2021-02-09 2021-03-02 2021-04-06 2022-04-07 upport ution vironnementale Page 4 CS-REF-18 / Recrutement du Component 4 - Operational s En cours d'exécut IDA / D4960 A posteriori Individuel Open 170,000.00 0.00 2020-12-16 2020-07-17 2021-01-25 2021-02-15 2021-03-22 2022-03-23 spécialiste en sauvegarde so upport ion ciale CS-REF-19 / Recrutement de Component 4 - Operational s En cours d'exécut IDA / D4960 A posteriori Individuel Open 101,000.00 0.00 2020-12-24 2020-12-30 2021-02-06 2021-05-24 2021-02-27 2021-03-29 2022-03-30 l'Assistant en Passation des upport ion Martchés CS-REF-23 / Recrutement Co Component 4 - Operational s nsultant technique Individuel IDA / D4960 A posteriori Individuel Limited 69,000.00 0.00 Annulé 2021-04-26 2021-05-01 2021-05-06 2021-05-31 2021-11-27 upport d'appui à l'UGP CS-REF-22 / Recrutement de Consultant Individuel pour as Component 4 - Operational s IDA / D4960 A posteriori Individuel Limited 250,000.00 0.00 Annulé 2021-04-12 2021-04-12 2021-04-22 2021-04-29 2021-05-15 2021-11-11 sistance aux activités relativ upport es à la passation des marché s CS-REF-24 / Recrutement de Consultant Individuel pour as Component 4 - Operational s En attente d'exéc IDA / D4960 A posteriori Individuel Open 200,000.00 0.00 2021-06-10 2021-07-14 2021-07-29 2021-08-23 2022-08-18 sistance aux activités relativ upport ution es à la passation des marché s CS-REF-25 / Recrutement de Component 4 - Operational s En attente d'exéc Consultant Individuel spéciali IDA / D4960 A posteriori Individuel Open 200,000.00 0.00 2021-06-08 2021-07-12 2021-07-27 2021-08-25 2022-08-20 upport ution ste et suivi evaluation CS-REF-26 / Recrutement d’ un consultant individuel pour Component 4 - Operational s En attente d'exéc IDA / D4960 A posteriori Individuel Limited 69,000.00 0.00 2021-07-08 2021-07-13 2021-07-28 2021-08-21 2022-08-21 l’élaboration d’un plan de co upport ution mmunication de l’UGP PASE M CS-REF-27 / Consultant indiv iduel Elaboration Cadre Gesti on Environnementale et Soci Component 4 - Operational s En cours d'exécut ale (CGES) et Plan d’Engage IDA / D4960 A posteriori Individuel Open 100,000.00 0.00 2021-08-10 2021-08-03 2021-09-13 2023-08-31 2021-09-28 2023-08-31 2021-10-23 2021-12-22 upport ion ment Environnemental et So cial (PEES) pour le Programm e National d’Amélioration de l’Accès à l’Electricité au Mali CS-REF-28 / Consultant indiv iduel Elaboration Cadre Politi que de Réinstallation des Pop Component 4 - Operational s En cours d'exécut ulations (CPRP) et Plan de Mo IDA / D4960 A posteriori Individuel Open 100,000.00 0.00 2021-08-10 2021-08-03 2021-09-13 2023-09-04 2021-09-28 2023-09-05 2021-10-23 2021-12-22 upport ion bilisation des Parties Prenant es (PMPP) pour le Programm e National d’Amélioration de l’Accès à l’Electricité au Mali CS-REF-29 / Consultant indiv iduel Elaboration Plan de Ges tion de la Main d’Œuvre (PG Component 4 - Operational s En cours d'exécut IDA / D4960 A posteriori Individuel Open 100,000.00 0.00 2021-08-09 2021-08-03 2021-09-12 2023-09-06 2021-09-27 2023-09-06 2021-10-22 2022-04-20 MO) et Plan de Gestion de la upport ion Sécurité (PGS) pour le Progra mme National d’Amélioration de l’Accès à l’Electricité au M ali CS-REF-31 / Recrutement d' Component 3 - EDM Govern un consultant pour l'évaluati ance improvement and supp En cours d'exécut IDA / 64570 A posteriori Individuel Limited - National 35,000.00 0.00 2024-03-18 2024-03-18 2024-03-23 2024-04-22 2024-05-20 2024-07-04 on de la politique énergétiqu ort to the implementation of ion e nationale de 2006 the EDM Restructuring Plan Page 5