PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western and Central Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western and Central Africa 2018-02-19 Bank’s Approval Date of the Original Procurement Plan: 2024-05-23 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / V1150, IDA / D2860, IDA / 62130, TF / A7130, TF / A7131, IDA / D8460 Ministry of Environnement/Directorate of Environment Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned 39 / Aménagement de burea Component 4: National Coor Single Stage - One E 2019-02-2 ux pour l’unité de gestion du IDA / V1150 A posteriori Appel d'offres Open - National 90,000.00 81,133.59 Signé 2018-05-07 2018-04-06 2018-05-12 2018-06-23 2018-05-07 2018-07-23 2018-05-26 2018-08-27 2018-09-13 dination nvelope 3 projet WACA 59 / Travaux d'aménagemen t du R+1 des bureaux pour l' UGP, Construction du mur de séparation, d'un parking pour Component 4: National Coor Single Stage - One E 2020-04-1 IDA / D2860 A posteriori Appel d'offres Open - National 190,000.00 0.00 Annulé 2019-06-27 2019-07-02 2019-08-13 2019-09-12 2019-10-17 10 voitures, un poste d'héber dination nvelope 4 gement (des compteurs et d u groupe électrogène) et am énagement de la cour (aires de circulation et jardin) 85 / Travaux d’aménagemen t de la cour du Ministère de l' Component 2: Strengthening Single Stage - One E 2021-01-1 environnement, du développ IDA / D2860 the Policy and Institutional F A posteriori Demande de prix Limited 105,000.00 126,079.40 Signé 2020-05-19 2020-04-24 2020-07-14 2020-09-09 nvelope 0 ement durable et de la prote ramework ction de la nature - en un (01 ) lot 114 / Travaux de constructio n de la clôture de la direction Component 4: National Coor Single Stage - One E 2020-12-0 IDA / D2860 A posteriori Demande de prix Open - National 70,000.00 55,047.27 Signé 2020-07-14 2020-09-08 2022-03-07 régionale des forestiers de la dination nvelope 8 réserve de Togodo Nord à AT AKPAME 88- / Travaux d'aménageme Component 4: National Coor Single Stage - One E 2021-03-0 nt du R+1 des bureaux pour l IDA / D2860 A posteriori Demande de prix Limited 152,728.00 0.00 Signé 2020-07-12 2020-07-16 2020-09-06 2021-01-22 dination nvelope 5 'UGP WACA ResIP, en lot uniq ue 104 / Travaux de protection Component 3: Strengthening d’urgence de la côte par la te Passation de marc 2021-02-1 IDA / D2860 National Physical and Social A posteriori Direct 909,090.90 899,211.65 Signé 2020-07-08 2020-07-03 2020-07-13 2020-08-19 2020-08-17 2020-10-01 chnique de juxtaposition de p hé de gré à gré 3 Investments uits en fûs granulitique. TG-WACA TOGO-204668-CW Component 3: Strengthening Single Stage - One E 2021-04-1 -RFQ / Construction de deux ( TF / A7131 National Physical and Social A posteriori Demande de prix Limited 30,000.00 0.00 Annulé 2021-01-20 2021-03-18 nvelope 7 02) bâtiments à TOGODO Investments TG-WACA TOGO-204671-CW Component 3: Strengthening -RFQ / Travaux de constructi Single Stage - One E 2021-09-1 TF / A7130 National Physical and Social A posteriori Demande de prix Limited 60,000.00 0.00 Annulé 2021-01-25 2021-03-22 on de deux (02) étangs et de nvelope 8 Investments deux (02) forages à TOGODO 92 / Travaux de construction Component 2: Strengthening Single Stage - One E 2021-02-2 IDA / D2860 A posteriori Demande de prix Limited 106,000.00 0.00 Annulé 2020-07-01 2020-08-26 du siège de l'ANGE the Policy and Institutional F nvelope 2 ramework Document nation TG-WACA TOGO-239069-CW al de passation de -RFQ / Travaux d'aménagem Component 2: Strengthening s marchés - Proce ent (réhabilitation) de la salle Single Stage - One E 2022-02-1 IDA / D2860 the Policy and Institutional F A posteriori Demande de prix Limited ssus à une envelo 30,000.00 0.00 Signé 2021-09-20 2022-04-26 2021-11-15 2022-10-24 de vidéo conférence du progr nvelope 3 ramework ppe (DTPM ne pro amme de licence en océano venant pas de la graphie de l'université de Kar Banque) a Document nation TG-WACA TOGO-239044-CW al de passation de -RFB / TRAVAUX DE CONSTR Component 3: Strengthening s marchés - Proce Single Stage - One E 2022-07-2 UCTION DES UNITES DE TRA IDA / D2860 National Physical and Social A posteriori Appel d'offres Open - National ssus à une envelo 937,389.00 653,009.74 Signé 2021-10-15 2021-08-09 2021-10-20 2021-11-19 2021-11-02 2021-12-19 2021-11-13 2022-01-23 2022-04-01 nvelope 2 NSFORMATIONS DANS LES A Investments ppe (DTPM ne pro GR PILOTES EN SEPT (07) LO venant pas de la TS Banque) TG-WACA TOGO-255574-CW -RFB / TRAVAUX DE CONSTR Document nation UCTION ET DE REHABILITATI al de passation de ON DE CABINES DE TOILETT Component 3: Strengthening s marchés - Proce Single Stage - One E 2022-06-0 ES EQUIPES DE DISPOSITIFS IDA / D2860 National Physical and Social A posteriori Appel d'offres Open - National ssus à une envelo 177,273.00 192,765.13 Signé 2021-10-29 2021-08-09 2021-11-03 2021-12-03 2021-11-03 2022-01-02 2021-11-14 2022-02-06 2022-05-10 nvelope 6 DE LAVE-MAIN DANS LES EC Investments ppe (DTPM ne pro OLES, ET DE CONSTRUCTION venant pas de la DE TOILETTES ECOSAN DANS Banque) LES MENAGES DE LA COMMU NE DES LACS 1( en 04 lots) Document nation TG-WACA TOGO-222964-CW al de passation de -RFQ / renforcement (travaux Component 3: Strengthening s marchés - Proce Single Stage - One E 2022-07-2 de réhabilitation) du poste se IDA / D2860 National Physical and Social A posteriori Demande de prix Open - National ssus à une envelo 109,000.00 0.00 Annulé 2021-11-02 2022-01-25 nvelope 4 cours d'urgence (PSR) du cor Investments ppe (DTPM ne pro ps des sapeurs - pompiers de venant pas de la la Région de Lomé Nord Banque) Document nation TG-WACA TOGO-239057-CW al de passation de -RFB / construction de trois ( Component 2: Strengthening s marchés - Proce 03) postes de relais forestier Single Stage - One E 2022-06-0 TF / A7130 the Policy and Institutional F A posteriori Appel d'offres Open - National ssus à une envelo 90,000.00 0.00 Annulé 2021-10-25 2021-10-30 2021-11-29 2021-12-29 2022-02-02 s équipés de panneaux solair nvelope 2 ramework ppe (DTPM ne pro es et de forages à motricité h venant pas de la umaine dans le complexe d’a Banque) ires protégées de Togodo. Demande d'offres TG-WACA TOGO-239048-CW Component 2: Strengthening Single Stage - One E - DTPM Petits trav 2022-07-0 -RFB / Réhabilitation de la br TF / A7130 the Policy and Institutional F A posteriori Appel d'offres Open - National 100,000.00 0.00 Annulé 2021-10-29 2021-11-03 2021-12-03 2022-01-02 2022-02-06 nvelope aux - (Processus à 6 igade de Togodo Nord ramework 1 enveloppe) Document nation al de passation de TG-WACA TOGO-255877-CW Component 3: Strengthening Single Stage - One E s marchés - Proce 2022-07-2 -RFQ / Réhabilitation de la bri TF / A7130 National Physical and Social A posteriori Demande de prix Limited 100,000.00 105,469.51 Signé 2021-12-05 2021-11-10 2022-01-30 2022-04-29 nvelope ssus à une envelo 9 gade de Togodo Nord Investments ppe (DTPM ne pro venant pas de la Document Banque) nation TG-WACA TOGO-255863-CW al de passation de -RFQ / renforcement (travaux Component 3: Strengthening s marchés - Proce Single Stage - One E 2022-05-1 de réhabilitation) du poste se IDA / D2860 National Physical and Social A posteriori Demande de prix Limited ssus à une envelo 109,000.00 93,880.49 Signé 2021-11-20 2021-11-10 2022-01-15 2022-04-29 nvelope 5 cours d'urgence (PSR) du cor Investments ppe (DTPM ne pro ps des sapeurs - pompiers de venant pas de la la Région de Lomé Nord Banque) Page 1 Document nation TG-WACA TOGO-255873-CW al de passation de -RFQ / construction de trois ( Component 3: Strengthening s marchés - Proce Single Stage - One E 2022-07-1 03) postes de relais forestier TF / A7130 National Physical and Social A posteriori Demande de prix Limited ssus à une envelo 90,000.00 0.00 Signé 2021-11-24 2022-04-14 2022-01-19 2022-10-10 nvelope 8 s équipés de panneaux solair Investments ppe (DTPM ne pro es dans le complexe d’aires venant pas de la protégées de Togodo. Banque) Document nation TG-WACA TOGO-238677-CW al de passation de -RFB / Construction de toilett Component 3: Strengthening s marchés - Proce Single Stage - One E 2022-03-1 e dans les ménages (12 lots) IDA / D2860 National Physical and Social A posteriori Appel d'offres Open - National ssus à une envelo 177,273.00 0.00 Annulé 2021-08-03 2021-08-08 2021-09-07 2021-10-07 2021-11-11 nvelope 1 et dans les écoles en six (06) Investments ppe (DTPM ne pro lots soit en 18 lots au total venant pas de la Banque) TG-WACA TOGO-204666-CW Component 3: Strengthening Single Stage - One E 2021-08-1 -RFB / Réhabilitation de 90 k TF / A7130 National Physical and Social A posteriori Appel d'offres Open - National 210,606.00 0.00 Annulé 2021-01-06 2021-01-11 2021-02-10 2021-03-12 2021-04-16 nvelope 4 m de piste, 7 ponceaux et 15 Investments radiers à Togodo Document nation TG-WACA TOGO-276081-CW al de passation de -RFQ / Aménagement de la c Component 4: National Coor Single Stage - One E s marchés - Proce 2023-03-0 IDA / D2860 A posteriori Demande de prix Limited 54,546.00 0.00 Signé 2022-07-11 2022-07-18 2022-09-05 2022-12-28 our et d'un parking de l'UGP dination nvelope ssus à une envelo 4 WACA ResIP ppe (DTPM ne pro venant pas de la Banque) Document nation TG-WACA TOGO-238692-CW al de passation de -RFB / Construction de forage Component 3: Strengthening s marchés - Proce (dans les préfectures de Yoto Single Stage - One E 2023-04-0 IDA / D2860 National Physical and Social A posteriori Appel d'offres Open - National ssus à une envelo 231,090.00 0.00 Signé 2022-08-31 2021-08-18 2022-09-05 2022-10-05 2022-04-21 2022-11-04 2022-09-02 2022-12-09 2022-10-17 , Bas-Mono, Lacs, Vo, Avé, Zi nvelope 8 Investments ppe (DTPM ne pro o et Golfe) pour les sous-proj venant pas de la ets communautaire en cinq ( Banque) 05) lots TG-WACA TOGO-262261-CW Demande de cota Component 3: Strengthening -RFQ / construction et équipe Single Stage - One E tions (DTPM ne pr En attente d 2022-11-2 TF / A7130 National Physical and Social A posteriori Demande de prix Limited 20,000.00 0.00 2022-08-29 2022-10-24 ment de trois forages dans le nvelope ovenant pas de la 'exécution 3 Investments complexe forestier de Togod Banque) o TG-WACA TOGO-290356-CW Demande de cota -RFQ / TRAVAUX DE CURAGE Component 3: Strengthening Single Stage - One E tions (DTPM ne pr 2023-05-2 DE LA MARE A TOMETY KOND TF / A7130 National Physical and Social A posteriori Demande de prix Limited 128,000.00 0.00 Annulé 2022-10-05 2022-11-30 nvelope ovenant pas de la 9 JI ET DE CONSTRUCTION DE Investments Banque) DEUX 02 ETANGS DANS LA F ORET TG-WACA TOGO-265124-CW Demande d'offres Component 3: Strengthening -RFB / Réhabilitation de pist Single Stage - One E - DTPM Travaux - 2023-06-1 TF / A7130 National Physical and Social A posteriori Appel d'offres Open - National 1,145,500.00 0.00 Signé 2022-08-24 2022-08-29 2022-08-29 2022-10-10 2022-09-21 2022-11-09 2022-10-07 2022-12-14 2023-02-12 e, construction de ponceaux nvelope Droit civil français 2 Investments et radiers à Togodo (français) Demande de cota TG-WACA TOGO-306588-CW Component 3: Strengthening Single Stage - One E tions (DTPM ne pr 2023-03-3 -RFQ / Construction de la Brig IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 120,000.00 0.00 Signé 2022-10-05 2022-10-11 2022-11-30 2023-02-18 nvelope ovenant pas de la 0 ades Forestières de Togodo S Investments Banque) ud TG-WACA TOGO-313426-CW Demande d'offres -RFB / TRAVAUX DE CURAGE Component 3: Strengthening Open - Internationa Single Stage - One E - DTPM Travaux (s 2023-04-1 MÉCANIQUE ET DE RESTAUR IDA / 62130 National Physical and Social A posteriori Appel d'offres 7,289,738.00 0.00 Signé 2022-11-30 2022-10-24 2022-12-05 2022-11-07 2023-01-16 2022-12-22 2023-02-15 2023-03-02 2023-03-23 2023-12-26 l nvelope ans préqualificati 9 ATION DES ECOSYSTEMES A Investments on) SSOCIES DU CHENAL DE GBA GA Demande de cota TG-WACA TOGO-313517-CW Component 3: Strengthening Single Stage - One E tions (DTPM ne pr 2023-06-2 -DIR / TRAVAUX DE RÉHABILI IDA / 62130 National Physical and Social A posteriori Demande de prix Limited 72,000.00 0.00 Signé 2022-11-02 2022-09-27 2022-12-28 2022-12-12 nvelope ovenant pas de la 6 TATION DE L'EPP AGBODRAF Investments Banque) O Document nation al de passation de TG-WACA TOGO-276078-CW Component 2: Strengthening Single Stage - One E s marchés - Proce 2023-02-0 -RFB / construction de la dire TF / A7130 the Policy and Institutional F A posteriori Demande de prix Limited 145,455.00 0.00 Signé 2022-06-13 2023-03-29 2022-08-08 nvelope ssus à une envelo 4 ctions préfectorale de Vo ramework ppe (DTPM ne pro venant pas de la Banque) TG-WACA TOGO-355573-CW Demande de cota -RFQ / achèvement des trava Component 4: National Coor Single Stage - One E tions (DTPM ne pr En attente d 2024-01-2 ux de clôture de la direction r IDA / D2860 A posteriori Demande de prix Limited 60,000.00 0.00 2023-06-04 2023-07-30 dination nvelope ovenant pas de la 'exécution 6 égionale de l'environnement Banque) et des ressources forestières plateaux TG-WACA TOGO-355341-CW Demande de cota Component 3: Strengthening -RFQ / PRÉPARATION DU SOL Single Stage - One E tions (DTPM ne pr En cours d'e 2023-08-2 TF / A7130 National Physical and Social A posteriori Demande de prix Limited 150,000.00 0.00 2023-05-29 2023-05-22 2023-07-24 ET LABOUR MÉCANIQUE POU nvelope ovenant pas de la xécution 3 Investments R LE REBOISEMENT PAR L'OD Banque) EF ET LA MAIRIE Vo3 Demande de cota TG-WACA TOGO-364034-CW Component 3: Strengthening tions - DTPM Petit Single Stage - One E En cours d'e 2023-11-2 -RFQ / ENLÈVEMENT DE FUTS IDA / 62130 National Physical and Social A posteriori Demande de prix Limited s travaux (urgenc 126,000.00 0.00 2023-08-05 2023-09-30 nvelope xécution 9 EN BÉTON NON ARME A ADIS Investments e) - Avec compéti SEM tion TG-WACA TOGO-379499-CW -RFQ / Achèvement des trava Demande de cota ux des sous projets de Lacs1 Component 3: Strengthening Single Stage - One E tions (DTPM ne pr En attente d 2024-07-2 et Chenal Gbaga en lot uniqu IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 120,000.00 0.00 2023-12-05 2024-01-30 nvelope ovenant pas de la 'exécution 8 e (achèvement des travaux d Investments Banque) e construction de bureau de Fah Gbaga, du service de voi rie, du centre de tri de la mai rie Lacs1) TG-WACA TOGO-381578-CW Demande de cota Component 3: Strengthening -RFQ / Construction de clôtur Single Stage - One E tions (DTPM ne pr En attente d 2024-05-2 IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 15,000.00 0.00 2023-12-27 2024-02-21 e et latrine en lot unique au nvelope ovenant pas de la 'exécution 1 Investments profit du sous projet Moméka Banque) tihoé TG-WACA TOGO-382538-CW Demande d'offres Component 3: Strengthening -RFB / Travaux de lutte contr Open - Internationa Single Stage - One E - DTPM Travaux (s En attente d 2025-04-1 IDA / D2860 National Physical and Social A posteriori Appel d'offres 4,000,000.00 0.00 2024-02-28 2024-03-04 2024-04-15 2024-05-15 2024-06-19 e les inondations dans les pr l nvelope ans préqualificati 'exécution 5 Investments éfectures des Lacs et Vo on) TG-WACA TOGO-389181-CW Demande de cota Component 3: Strengthening -RFQ / TRAVAUX DE TERRASS Single Stage - One E tions (DTPM ne pr En attente d 2024-05-2 IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 48,000.00 0.00 2024-01-02 2024-02-27 EEMENT POUR LA CONSTRUC nvelope ovenant pas de la 'exécution 7 Investments TION DE LA PTFM A ADAME Banque) Demande de cota TG-WACA TOGO-290370-CW Component 4: National Coor Single Stage - One E tions (DTPM ne pr En attente d 2023-05-2 -RFQ / Travaux d'extension R IDA / D2860 A posteriori Demande de prix Limited 200,000.00 0.00 2022-10-03 2022-11-28 dination nvelope ovenant pas de la 'exécution 7 +2 du Bâtiment de la Coordi Banque) nation nationale TG-WACA TOGO-401225-CW Demande d'offres -RFQ / Achèvement des trava Component 3: Strengthening Single Stage - One E - DTPM Petits trav En attente d 2025-01-1 ux de construction des l'unité IDA / D2860 National Physical and Social A posteriori Appel d'offres Open - National 350,000.00 0.00 2024-05-27 2024-06-01 2024-07-01 2024-07-16 2024-08-20 nvelope aux - (Processus à 'exécution 7 s de transformation à KODJO Investments 1 enveloppe) et DJOLO en lot unique Page 2 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 35 / Acquisition de matériels Component 4: National Coor Single Stage - One E IDA / V1150 A posteriori Demande de prix Limited 15,000.00 0.00 Annulé 2018-05-13 2018-07-08 2019-01-04 informatiques dination nvelope 37 / Acquisition du mobilier Component 4: National Coor Single Stage - One E IDA / V1150 A posteriori Demande de prix Limited 25,000.00 23,847.22 Signé 2018-07-17 2018-09-03 2018-09-11 2018-11-10 2019-03-10 de bureau pour la coordinatio dination nvelope n du projet 34 / Achat de fournitures de bureau, matériels de bureau et matériels d'entretien de b ureau en 03 lots. Component 4: National Coor Single Stage - One E Lot 1 fournitures de bureau ( IDA / V1150 A posteriori Demande de prix Limited 10,000.00 7,637.09 Signé 2018-02-03 2018-02-16 2018-03-31 2018-08-14 2018-09-27 dination nvelope papiers rames, bics,..) Lot 2 matériels de bureau (re liure) et Lot 3 matériels d'entretien d e bureau (gel désinfectant, ... ). 35 BIS / Acquisition de fourni tures informatiques et de ma tériels informatiques en 02 lo ts : Lot 1 fournitures informat Component 4: National Coor Single Stage - One E IDA / V1150 A posteriori Demande de prix Limited 27,000.00 26,469.61 Signé 2018-01-09 2018-01-11 2018-03-06 2018-08-14 2018-09-02 iques (cartouches d'encre, an dination nvelope tivirus, disques durs) et Lot 2 matériels informatiques (or dinateurs de bureau, ordinat eurs portables, scanners ..) 41BIS / Le matériel roulant s era composé comme suit : Lo t 1: 2 pick-up 4x4 double cab Component 4: National Coor Single Stage - One E IDA / D2860 A posteriori Demande de prix Limited 294,000.00 113,114.60 Signé 2019-04-20 2019-10-10 2019-06-15 2020-05-29 2019-12-12 ine tropicalisés pour les missi dination nvelope ons de terrain, Lot2: 01 stati on wagon , Lot3: 01 mini bus. 65 / Acquisition de matériel r Component 4: National Coor Single Stage - One E oulant (moto) pour les 7 CPD TF / A7130 A posteriori Demande de prix Limited 40,000.00 0.00 Annulé 2019-07-01 2019-08-26 2020-02-22 dination nvelope D et le coursier de l'UGP 66 / Acquisition de GPS pour Component 4: National Coor Single Stage - One E les CPDD (07) et l'unité de ge TF / A7130 A posteriori Demande de prix Limited 20,000.00 0.00 Signé 2019-07-02 2019-09-10 2019-08-27 2020-10-16 2020-02-23 dination nvelope stion du projet (5) soit au tot al 12 GPS 58 / Acquisition de matériel et fourniture informatique po ur le projet (Ordinateur burea u +portable en poste de trav, Component 4: National Coor Single Stage - One E IDA / D2860 A posteriori Demande de prix Limited 50,000.00 0.00 Annulé 2019-06-16 2019-08-11 2020-02-07 copieur, imprimante couleur, dination nvelope blanc noir, clé USB multi copi eur, disque dure, vidéo proje cteur, onduleurs, modem pou r connexion Wifi, camera... 74 / Acquisition de 2 véhicul Component 2: Strengthening Single Stage - One E es de terrain pour l'Agence N IDA / D2860 the Policy and Institutional F A posteriori Demande de prix Limited 85,000.00 0.00 Annulé 2019-06-26 2019-08-21 2020-02-17 nvelope ationale de Gestion de l'Envir ramework onnement 98 / Production des supports Component 4: National Coor Single Stage - One E IDA / D2860 A posteriori Demande de prix Open - National 36,364.00 16,660.05 Signé 2020-04-14 2020-06-09 2021-05-27 2020-12-06 de communications - un lot dination nvelope 83 / Acquisition de matériel et fourniture informatique, et Component 2: Strengthening matériels bureautique pour l Single Stage - One E IDA / D2860 the Policy and Institutional F A posteriori Appel d'offres Open - National 473,091.00 229,876.88 Signé 2020-06-25 2020-07-23 2020-06-30 2020-08-11 2020-09-25 2020-09-10 2020-10-26 2020-10-15 2021-05-05 2021-01-15 es CPDD, l'ANGE,Direction de nvelope ramework l'Environnement, Economie B leue et l'UGP WACA - Lot uni que 107 / Acquisition de matériel Component 2: Strengthening Passation de marc s roulants pour le Haut Conse IDA / D2860 the Policy and Institutional F A posteriori hés auprès des ag Direct 232,727.00 0.00 Annulé 2020-06-02 2020-06-07 2020-07-12 2020-09-30 il pour la Mer, l’ANGE et l’UG ramework ences de l'ONU P WACA ResIP 84BIS / Acquisition de matéri Component 2: Strengthening Passation de marc els roulants (engins TP) pour IDA / D2860 the Policy and Institutional F A posteriori hés auprès des ag Direct 531,000.00 0.00 Annulé 2020-06-02 2020-06-07 2020-07-12 2020-11-12 la Mairie d’Aného – lot uniqu ramework ences de l'ONU e 81 / Acquisition de matériels Component 2: Strengthening Single Stage - One E roulants pour le développem IDA / D2860 the Policy and Institutional F A posteriori Demande de prix Limited 187,272.73 0.00 Annulé 2020-04-13 2020-06-08 2020-12-05 nvelope ent de l'économie bleue et l' ramework ANGE - 02 Lots 109 / Acquisition de trois (03 Component 4: National Coor Single Stage - One E ) téléphones portables pour l’ IDA / D2860 A posteriori Demande de prix Limited 2,190.00 3,558.26 Signé 2020-08-16 2020-09-08 2020-10-11 2020-09-28 2020-10-27 dination nvelope UGP WACA ResIP 118 / Acquisition de mobilier Component 2: Strengthening Single Stage - One E de bureau pour l'ANGE et l'Ec IDA / D2860 the Policy and Institutional F A posteriori Demande de prix Limited 36,364.00 6,936.87 Signé 2020-10-05 2021-05-18 2020-11-30 2022-02-05 2021-01-28 nvelope onomie Bleue ramework 120 / Acquisition de technol ogie des systèmes aériens sa Component 2: Strengthening ns pilotes (drone, logiciels, d Single Stage - One E IDA / D2860 the Policy and Institutional F A posteriori Demande de prix Limited 70,000.00 0.00 Signé 2020-10-05 2021-06-28 2020-11-30 2022-10-21 2021-03-01 e matériel et fourniture infor nvelope ramework matiques, Formations) pour l a production d'une cartograp hie 2D et 3D de gestion de la côte TG-WACA TOGO-211741-GO- Component 2: Strengthening Passation de marc UN / Acquisition de matériel r IDA / D2860 the Policy and Institutional F A posteriori hés auprès des ag Direct 836,049.00 1,310,421.00 Signé 2020-10-15 2020-06-02 2020-10-16 2020-11-25 2020-11-22 2020-12-16 2021-02-20 oulant pour la coordination e ramework ences de l'ONU t les partenaires TG-WACA TOGO-222191-GO- RFQ / Achat de véhicule Stati Component 2: Strengthening Single Stage - One E on WAGON pour le Ministère IDA / 62130 the Policy and Institutional F A posteriori Demande de prix Limited 60,000.00 52,272.60 Signé 2021-05-25 2021-06-11 2021-07-20 2022-02-05 2021-08-19 nvelope de la Protection côtière, de la ramework Pêche et de l'Economie Mariti me TG-WACA TOGO-223503-GO- Component 2: Strengthening RFQ / Equipements de suivi e Single Stage - One E TF / A7130 the Policy and Institutional F A posteriori Demande de prix Limited 18,182.00 0.00 Signé 2021-07-05 2022-04-28 2021-08-30 2022-09-29 2021-09-29 t surveillance pour les comm nvelope ramework unautés locales (30 tablettes ) Page 3 TG-WACA TOGO-232179-GO- RFQ / Acquisition de matériel pour la vidéoconférence pour Component 4: National Coor Single Stage - One E IDA / 62130 A posteriori Demande de prix Limited 97,273.00 35,295.12 Signé 2021-07-20 2021-06-29 2021-09-14 2022-04-01 2021-10-14 la salle de réunion de l'UGP (l dination nvelope ot1) et pour la faculté de géo graphie de l'université de Kar a (lot2) TG-WACA TOGO-249718-GO- RFQ / ACQUISITION DE MOBIL Component 4: National Coor Single Stage - One E IDA / D2860 A posteriori Demande de prix Limited 50,000.00 42,374.50 Signé 2021-10-05 2021-09-07 2021-11-30 2022-02-17 2021-12-30 IER DE BUREAU POUR L'UNIT dination nvelope E DE COORDINATION NATION ALE TG-WACA TOGO-223620-GO- RFQ / acquisition de matériel Component 2: Strengthening Single Stage - One E et équipement de laboratoire IDA / D2860 the Policy and Institutional F A posteriori Appel d'offres Open - National 110,000.00 0.00 Signé 2021-11-15 2021-10-01 2021-11-20 2021-12-20 2021-11-16 2022-01-19 2021-12-29 2022-02-23 2022-07-05 2022-05-24 nvelope pour les départements de gé ramework ographie des universités de L omé et Kara TG-WACA TOGO-265102-GO- Component 4: National Coor Single Stage - One E RFQ / Fourniture et installatio IDA / D2860 A posteriori Demande de prix Limited 54,000.00 0.00 Signé 2022-06-01 2022-02-25 2022-07-27 2023-01-27 2023-01-23 dination nvelope n de groupe électrogène TG-WACA TOGO-276063-GO- Component 3: Strengthening RFB / Acquisition et installati Open - Internationa Single Stage - One E En attente d' IDA / D2860 National Physical and Social A posteriori Appel d'offres 650,000.00 0.00 2022-09-30 2022-10-05 2022-11-16 2022-12-16 2023-01-20 2023-07-19 on d'un centre de contrôle et l nvelope exécution Investments d'une station météorologique marine TG-WACA TOGO-276061-GO- Component 3: Strengthening Single Stage - One E RFQ / Acquisition de matériel IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 100,000.00 0.00 Annulé 2022-06-28 2022-08-31 2023-02-27 nvelope de collecte des données par l Investments es institutions TG-WACA TOGO-260437-GO- RFB / FOURNITURE ET INSTAL LATION DE MINI CENTRALES SOLAIRES AVEC RESEAU ELE Component 3: Strengthening CTRIQUE, DE PLATEFORMES Single Stage - One E TF / A7130 National Physical and Social A posteriori Appel d'offres Open - National 218,000.00 0.00 Signé 2022-07-28 2022-01-31 2022-08-02 2022-09-01 2022-04-20 2022-10-01 2022-08-12 2022-11-05 2022-11-24 2023-03-05 MULTIFONCTIONNELLES ALIM nvelope Investments ENTEES PAR LA CENTRALE S OLAIRE ET DES KITS DE LAMP ADAIRES AUTONOMES EN 04 LOTS DANS 04 LOCALITES (A damé, Afito, Godjinmé et Nya massiva) TG-WACA TOGO-223532-GO- RFQ / Acquisition d'équipeme nt pour la mise en place d'un Component 2: Strengthening e base de données de gestio Single Stage - One E IDA / D2860 the Policy and Institutional F A posteriori Demande de prix Limited 95,454.00 0.00 Signé 2022-10-05 2022-04-26 2022-11-30 2023-01-29 2023-02-28 n des ouvrages côtiers (serve nvelope ramework ur, ordinateurs portables, dis que durs externe, appareil p hoto professionnel, etc...) et des ordinateurs portables TG-WACA TOGO-292672-GO- RFQ / Acquisition d'équipeme nts complémentaires de prod Component 2: Strengthening Single Stage - One E En attente d' uction des plants et d'expéri TF / A7130 the Policy and Institutional F A posteriori Demande de prix Limited 54,000.00 0.00 2022-09-05 2022-10-31 2022-11-30 nvelope exécution mentation pour le centre se ramework mencier de Davié (Ombrière, Humidi-mètre ,PH-mètre, Mél angeur de terreau) TG-WACA TOGO-292843-GO- Component 3: Strengthening Single Stage - One E RFQ / Achat d'un porte-char IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 70,000.00 0.00 Signé 2022-07-25 2022-06-08 2022-09-19 2022-12-27 2023-03-18 nvelope pour la commune Lacs1 Investments TG-WACA TOGO-306594-GO- Component 2: Strengthening Single Stage - One E RFB / Acquisition des équipe IDA / D2860 the Policy and Institutional F A posteriori Appel d'offres Open - National 360,000.00 0.00 Annulé 2022-09-30 2022-10-05 2022-11-04 2022-12-04 2023-01-08 2023-01-20 nvelope ments du studio (Météo médi ramework a) TG-WACA TOGO-313510-GO- Component 3: Strengthening RFQ / Fourniture et pose de p Single Stage - One E IDA / 62130 National Physical and Social A posteriori Demande de prix Limited 18,000.00 0.00 Signé 2022-11-05 2022-08-24 2022-12-31 2022-09-16 2023-06-29 anneaux de signalisation sur nvelope Investments les sites de travaux de prote ction côtière TG-WACA TOGO-326628-GO- RFQ / Acquisition des équipe Component 3: Strengthening ments de maraichage (Bande Single Stage - One E TF / A7130 National Physical and Social A posteriori Demande de prix Limited 130,000.00 0.00 Signé 2022-12-20 2023-01-25 2023-02-14 2023-08-22 2023-08-13 s perforées, motopompe et a nvelope Investments ccessoires, Pulvérisateur élec trique rechargeable etc..) TG-WACA TOGO-313451-GO- Component 3: Strengthening Single Stage - One E RFQ / ACHAT DE TRACTEUR P IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 40,000.00 0.00 Signé 2023-02-20 2023-02-21 2023-04-17 2023-08-14 2023-10-14 nvelope OUR LA COMMUNE LAC 1 Investments TG-WACA TOGO-308000-GO- Component 2: Strengthening Single Stage - One E TF / A7130 A posteriori Demande de prix Limited 150,000.00 0.00 Signé 2023-02-20 2023-02-22 2023-04-17 2023-08-08 2023-10-14 RFQ / Acquisition d'un camio the Policy and Institutional F nvelope n fourgon ramework TG-WACA TOGO-346896-GO- Component 3: Strengthening RFB / Acquisition des équipe Single Stage - One E En cours d'ex IDA / D2860 National Physical and Social A posteriori Appel d'offres Open - National 566,273.00 0.00 2023-04-24 2023-05-16 2023-04-29 2023-05-29 2023-06-28 2023-08-02 2024-02-28 ments de transformation en nvelope écution Investments sept (07) lots pour les 7 AGR TG-WACA TOGO-355426-GO- Component 3: Strengthening RFQ / acquisition de plants p Single Stage - One E TF / A7130 National Physical and Social A posteriori Demande de prix Limited 140,000.00 0.00 Annulé 2023-05-20 2023-07-15 2024-01-11 our le reboisement par ODEF nvelope Investments et les mairies des préfecture s des Lacs et Vo 97 / Réalisation des films do Component 4: National Coor Single Stage - One E IDA / D2860 A posteriori Demande de prix Open - National 27,909.00 0.00 Annulé 2020-05-27 2020-07-22 2021-01-18 cumentaires dination nvelope 93 / Fournitures de bureau p Component 4: National Coor Single Stage - One E our l'UGP ( Accord cadre attri TF / A7130 A posteriori Demande de prix Open 20,000.00 0.00 Annulé 2020-04-20 2020-06-15 2020-12-12 dination nvelope bution par article) TG-WACA TOGO-223544-GO- Component 2: Strengthening RFQ / Edition et vulgarisation Single Stage - One E IDA / D2860 the Policy and Institutional F A posteriori Demande de prix Limited 5,544.00 0.00 Annulé 2021-05-31 2021-07-26 2021-08-25 du guide d'intégration de l'éc nvelope ramework onomie bleu dans les docum ents de planification TG-WACA TOGO-234936-GO- Component 2: Strengthening Single Stage - One E TF / A7130 A posteriori Demande de prix Limited 5,000.00 0.00 Annulé 2021-08-04 2021-09-29 2021-11-28 RFQ / achat de deux (02) dro the Policy and Institutional F nvelope nes ramework Page 4 TG-WACA TOGO-365276-GO- Component 3: Strengthening RFQ / Acquisition de plants p Single Stage - One E TF / A7130 National Physical and Social A posteriori Demande de prix Limited 50,000.00 0.00 Signé 2023-08-05 2023-06-09 2023-09-30 2023-08-18 2024-03-28 our l'ODEF (Tectona grandis, nvelope Investments Gmelina arborea, Khaya sene galensis etc..) TG-WACA TOGO-365283-GO- RFQ / achat de plants pour la Component 3: Strengthening Single Stage - One E commune Lacs 2 (Khaya sen TF / A7130 National Physical and Social A posteriori Demande de prix Limited 5,900.00 0.00 Signé 2023-08-05 2023-06-09 2023-09-30 2023-09-27 2024-03-28 nvelope egalensis, Sena ciamea Gmel Investments ina arborea et autres essenc es naturelles) TG-WACA TOGO-365292-GO- Component 3: Strengthening Single Stage - One E RFQ / Acquisition de plants p TF / A7130 National Physical and Social A posteriori Demande de prix Limited 6,200.00 0.00 Signé 2023-08-13 2023-06-09 2023-10-08 2023-09-27 2024-04-05 nvelope our la mairie Lacs 3 Investments TG-WACA TOGO-365294-GO- RFQ / achat de plants pour la Component 3: Strengthening Single Stage - One E mairie Vo 1 (Khaya senegale TF / A7130 National Physical and Social A posteriori Demande de prix Limited 18,000.00 0.00 Signé 2023-08-09 2023-06-09 2023-10-04 2023-09-04 2024-04-01 nvelope nsis, Sena ciamea Gmelina ar Investments borea et autres essences nat urelles) TG-WACA TOGO-365296-GO- Component 3: Strengthening Single Stage - One E RFQ / acquisition de plants p TF / A7130 National Physical and Social A posteriori Demande de prix Limited 17,000.00 0.00 Signé 2023-08-13 2023-06-09 2023-10-08 2023-09-18 2024-04-05 nvelope our la mairie Vo 3 Investments TG-WACA TOGO-365299-GO- Component 3: Strengthening Single Stage - One E RFQ / achat de plants pour la TF / A7130 National Physical and Social A posteriori Demande de prix Limited 6,000.00 0.00 Signé 2023-08-13 2023-06-09 2023-10-08 2023-08-28 2024-04-05 nvelope mairie Vo 2 Investments TG-WACA TOGO-365279-GO- Component 3: Strengthening Single Stage - One E RFQ / acquisition de plants p TF / A7130 National Physical and Social A posteriori Demande de prix Limited 18,000.00 0.00 Signé 2023-10-05 2023-06-09 2023-11-30 2023-09-27 2024-05-28 nvelope our la commune des Lacs 1 Investments TG-WACA TOGO-400825-GO- RFQ / Acquisition de plants p Component 3: Strengthening Single Stage - One E En attente d' our les communes Lacs 2, La IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 15,000.00 0.00 2024-03-04 2024-04-29 2024-05-29 nvelope exécution cs 3 et Vo 2 dans le cadre de Investments la campagne de reboisement 2024 TG-WACA TOGO-400833-GO- Component 3: Strengthening RFQ / Acquisition de plants p Single Stage - One E En attente d' IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 100,000.00 0.00 2024-03-20 2024-05-15 2024-07-14 our la mairie vo 3 dans le cad nvelope exécution Investments re de la campagne de rebois ement 2024 TG-WACA TOGO-400837-GO- RFQ / Acquisition des plants pour l'appui au reboisement Component 3: Strengthening Single Stage - One E En attente d' de bois-énergie en soutien a IDA / D2860 National Physical and Social A posteriori Demande de prix Limited 100,000.00 0.00 2024-04-01 2024-05-27 2024-07-26 nvelope exécution ux actions de gestion des éc Investments osystèmes forestiers dans la zone du littoral dans les préf ectures des Lacs et Vo NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 36 / Edition du plan d'investi ssement et du document d'a Component 4: National Coor Single Stage - One E IDA / V1150 A posteriori Demande de prix Limited 18,000.00 20,365.63 Signé 2018-02-21 2018-02-16 2018-04-18 2018-08-16 2018-10-15 nalyse du cadre juridique inst dination nvelope itutionnel de gestion intégrée du littoral 38 / Paramétrage du logiciel Component 4: National Coor Passation de marc de gestion financière du PGIC IDA / V1150 A posteriori Direct 13,000.00 12,538.87 Signé 2018-07-05 2018-11-14 2018-07-10 2018-11-14 2018-08-14 2019-09-10 2019-02-10 dination hé de gré à gré T pour le projet WACA 52 / Recrutement d'un servic Component 4: National Coor Single Stage - One E IDA / D2860 A posteriori Demande de prix Limited 4,000.00 0.00 Signé 2019-06-29 2020-06-08 2019-08-24 2021-04-24 2020-02-20 e d'entretien dination nvelope 77 / Police d'assurance pour Component 4: National Coor Single Stage - One E le personnel recruté par le pr IDA / D2860 A posteriori Demande de prix Limited 20,000.00 12,512.77 Signé 2019-11-25 2019-09-10 2020-01-20 2020-04-11 2020-07-18 dination nvelope ojet WACA ResIP 17 BIS / Mise en place d'un s ystème informatisé de suivi d Component 4: National Coor Single Stage - One E IDA / D2860 A posteriori Appel d'offres Open - National 40,000.00 0.00 Annulé 2019-02-20 2019-05-08 2019-02-25 2019-04-08 2019-05-08 2019-06-12 2019-12-09 u projet (acquisition, installat dination nvelope ion et formation des utilisate urs) 119 / Service de gardiennag Component 4: National Coor Single Stage - One E IDA / D2860 A posteriori Demande de prix Limited 8,182.00 8,602.22 Signé 2020-08-17 2020-09-09 2020-10-12 2021-05-07 2021-10-09 e des bureaux de l'UGP dination nvelope TG-WACA TOGO-364035-NC- Component 4: National Coor Single Stage - One E En attente d' RFQ / Entretien et maintenan IDA / D2860 A posteriori Demande de prix Limited 24,000.00 0.00 2023-09-04 2023-10-30 2023-12-05 dination nvelope exécution ce de climatiseur CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 14 / Etude de faisabilité tech Component 3: Strengthening Sélection fondée s Open - Internationa nique de la protection côtière IDA / V1150 National Physical and Social A priori ur la qualité et le 2,000,000.00 0.00 Annulé 2018-02-06 2018-02-27 2018-04-12 2018-05-10 2018-06-09 2018-07-14 2018-08-18 2019-08-18 l du segment transfrontalier B Investments coût énin-Togo 15 / Etude d'Impact Environ Component 2: Strengthening Sélection fondée s nemental et Social (EIES) de l Open - Internationa IDA / V1150 the Policy and Institutional F A posteriori ur la qualité et le 320,000.00 0.00 Annulé 2018-02-08 2018-03-01 2018-04-14 2018-05-12 2018-06-11 2018-07-16 2018-08-20 2019-08-20 a protection côtière du segm l ramework coût ent transfrontalier Bénin-Tog o 19 / Etude d'Impact Environ nemental et Social (EIES) pou Component 2: Strengthening Sélection fondée s r le curage mécanique du ch IDA / V1150 the Policy and Institutional F A posteriori ur les qualification Open - National 200,000.00 0.00 Annulé 2018-09-25 2018-10-16 2018-11-29 2018-12-29 2019-02-02 2019-08-01 enal Gbaga et de restauratio ramework s des consultants n de ces écosystèmes associ és Page 5 46 / Evaluation du coût de la Component 2: Strengthening Sélection fondée s dégradation historique de la IDA / D2860 the Policy and Institutional F A posteriori ur les qualification Open - National 130,000.00 149,746.25 Signé 2019-01-17 2019-05-22 2019-02-07 2019-07-08 2019-03-23 2019-11-28 2019-04-22 2020-12-22 2019-05-27 2021-05-01 2019-11-23 côte y compris la vulnérabilit ramework s des consultants é des communautés côtières 42BIS / Etude de faisabilité t echnique de l'installation d'u Component 3: Strengthening Sélection fondée s Open - Internationa ne vanne au niveau du pont IDA / D2860 National Physical and Social A priori ur la qualité et le 650,000.00 0.00 Annulé 2019-03-05 2019-03-26 2019-05-09 2019-06-06 2019-07-06 2019-08-10 2019-09-14 2020-09-13 l de la lagune d'Aného et l'étu Investments coût de hydrodynamique du systè me fluvio-lagunaire 43 / Etude approfondie de fa Component 3: Strengthening Sélection fondée s Open - Internationa isabilité du traitement des bo IDA / 62130 National Physical and Social A priori ur la qualité et le 600,000.00 0.00 Annulé 2019-03-12 2019-04-02 2019-05-16 2019-06-13 2019-07-13 2019-08-17 2019-09-21 2020-09-20 l ues de phosphates rejetées e Investments coût n mer 44 / Elaboration du plan spat Component 4: National Coor Sélection fondée s Open - Internationa IDA / D2860 A posteriori 250,000.00 0.00 Annulé 2019-02-11 2019-03-04 2019-04-17 2019-05-15 2019-06-14 2019-07-19 2019-08-23 2020-08-22 ial marin et côtier dination ur la qualité et le l coût 45 / Evaluation du capital na Component 2: Strengthening Sélection fondée s Open - Internationa IDA / D2860 A posteriori 300,000.00 0.00 Annulé 2019-02-12 2019-03-05 2019-04-18 2019-05-16 2019-06-15 2019-07-20 2019-08-24 2020-08-23 turel de la zone côtière the Policy and Institutional F ur la qualité et le l ramework coût 49 / Audits financiers et com Component 4: National Coor Sélection au moin ptables du projet - exercices IDA / D2860 A posteriori Open - National 45,000.00 24,687.83 Signé 2019-02-11 2019-04-18 2019-03-04 2019-07-08 2019-04-17 2019-10-10 2019-05-15 2020-02-06 2019-06-14 2020-03-11 2019-07-19 2020-05-19 2019-08-23 2020-07-12 2020-02-19 dination dre coût 2017, 2018 et 2019 3 BIS / Etudes de faisabilité t echniques de dragage et de Component 3: Strengthening Sélection fondée s stabilisation des berges de la Open - Internationa IDA / D2860 National Physical and Social A posteriori ur la qualité et le 250,000.00 1,061,119.41 Signé 2018-10-04 2018-05-18 2018-10-25 2018-12-08 2019-08-28 2019-01-05 2019-10-10 2019-02-04 2019-10-25 2019-03-11 2019-12-13 2019-04-15 2020-09-08 2020-04-14 lagune et du lac Togo, et pou l Investments coût r la Construction et le curage de caniveau, de bassin d'ora ge, de retenue d'eau 48 / Etude d'Impact Environ nemental et Social (EIES) pou Component 3: Strengthening Sélection fondée s r le curage mécanique du ch TF / A7130 National Physical and Social A posteriori ur les qualification Open - National 100,000.00 0.00 Annulé 2018-12-28 2019-01-03 2019-01-18 2019-03-03 2019-04-02 2019-05-07 2019-11-03 enal Gbaga et de restauratio Investments s des consultants n de ces écosystèmes associ és 47B / Etude de faisabilité tec Component 3: Strengthening Sélection fondée s hnique pour le curage mécan Open - Internationa TF / A7130 National Physical and Social A priori ur la qualité et le 600,000.00 554,086.35 Signé 2019-04-26 2019-04-18 2019-05-17 2019-07-23 2019-06-30 2020-10-17 2019-07-28 2020-10-26 2019-08-27 2021-01-14 2019-10-01 2021-04-13 2019-11-05 2021-07-01 2020-11-04 ique du chenal de Gbaga et d l Investments coût e la restauration de ces écos ystèmes associés 47 / Etude de faisabilité tech Component 3: Strengthening Sélection fondée s nique du curage mécanique Open - Internationa TF / A7130 National Physical and Social A posteriori ur la qualité et le 300,000.00 0.00 Annulé 2018-12-28 2019-01-03 2019-01-18 2019-03-03 2019-03-31 2019-04-30 2019-06-04 2019-07-09 2020-07-08 du chenal Gbaga et de resta l Investments coût uration de ces écosystèmes associés 48B / Etude d'Impact Enviro nnemental et Social (EIES) po Component 3: Strengthening Sélection fondée s Open - Internationa En cours d'exécut ur le curage mécanique du c TF / A7130 National Physical and Social A posteriori ur les qualification 200,000.00 0.00 2019-04-26 2019-04-17 2019-05-17 2019-06-30 2019-08-13 2019-07-30 2021-02-26 2019-09-03 2020-03-01 l ion henal Gbaga et de restaurati Investments s des consultants on de ces écosystèmes assoc iés 40 / Surveillance et contrôle Sélection fondée s Component 4: National Coor des travaux d'aménagement IDA / V1150 A posteriori ur les qualification Open - National 18,000.00 0.00 Annulé 2018-07-11 2018-08-01 2018-09-14 2018-10-14 2018-11-18 2019-05-17 dination des bureaux du Projet WACA s des consultants 62 / Élaboration du plan d'a Component 3: Strengthening Sélection fondée s ménagement participatif et d Open - Internationa TF / A7130 National Physical and Social A posteriori ur les qualification 140,000.00 154,345.80 Signé 2019-08-28 2020-01-07 2019-09-18 2020-06-26 2019-11-01 2020-10-26 2019-12-01 2021-02-09 2020-01-05 2021-05-06 2020-07-03 es outils de gestion de la forê l Investments s des consultants t communautaire d'Avévé  63 / Elaboration du plan d'a Component 3: Strengthening Sélection fondée s ménagement participatif et d Open - Internationa TF / A7130 National Physical and Social A posteriori ur les qualification 150,000.00 154,345.80 Signé 2019-08-28 2020-01-07 2019-09-18 2020-06-26 2019-11-01 2020-10-15 2019-12-01 2021-02-09 2020-01-05 2021-05-06 2020-07-03 es outils de gestion de la forê l Investments s des consultants t communautaire de Kodjo-G ati 60 / Recrutement d'une stru cture ( centre de formation) Component 3: Strengthening Sélection fondée s pour la formation et l'accomp TF / A7130 National Physical and Social A posteriori ur les qualification Open - National 55,000.00 244,722.82 Signé 2019-08-28 2019-08-21 2019-09-18 2019-11-01 2020-05-05 2019-12-01 2020-06-10 2020-01-05 2021-06-16 2020-07-03 agnement des acteurs comm Investments s des consultants unautaires sur les bonnes pr atiques en gestion durable d es terres. 82 / Etude sur la situation de s plantes envahissantes, des Component 3: Strengthening Sélection fondée s Open - Internationa modèles de gestion et de val TF / A7130 National Physical and Social A posteriori ur les qualification 80,000.00 0.00 Signé 2019-12-30 2020-03-30 2020-01-20 2022-04-28 2020-03-04 2022-10-20 2020-04-03 2022-11-28 2020-05-08 2023-04-23 2020-11-04 l orisation dans la sous-région Investments s des consultants et les applications possibles dans la zone du projet 40 C / Surveillance et contrôl e des travaux d'aménageme nt du R + 1 des bureaux de l' Sélection fondée s Component 4: National Coor UGP, Construction du mur de IDA / D2860 A posteriori ur les qualification Open - National 20,000.00 0.00 Annulé 2019-08-28 2019-09-18 2019-11-01 2019-12-01 2020-01-05 2020-07-03 dination séparation, d'un parking pour s des consultants 10 voitures, d'un poste d'ach at et d'un aménagement de cour. 105 / Recrutement d'un cabi net pour l'actualisation de l'é tude de faisabilité technique Component 3: Strengthening Sélection fondée s du projet d'assainissement d Open - Internationa IDA / D2860 National Physical and Social A posteriori ur la qualité et le 120,000.00 111,390.00 Signé 2020-06-30 2020-09-16 2020-07-21 2021-01-20 2020-09-03 2021-04-15 2020-10-01 2021-07-02 2020-10-31 2021-07-28 2020-12-05 2021-08-19 2021-01-09 2022-02-17 2022-01-09 es eaux usées à la plage de L l Investments coût omé, réhabilitation du réseau embryonnaire d'assainissem ent collectif des eaux usées de la ville de Lomé au Togo 121 / Recrutement d'un cabi net pour le contrôle et surveil Component 3: Strengthening Sélection fondée s lance des travaux d’urgence IDA / D2860 National Physical and Social A posteriori ur les qualification Limited 910.00 90,871.35 Signé 2020-08-07 2020-08-09 2020-08-21 2020-08-25 2020-09-20 2020-11-10 2020-10-25 2021-02-18 2021-02-24 de protection contre l’érosion Investments s des consultants côtière des habitations vulné rables sur le littoral togolais allant de Gbodjomé à Agbodr afo. TG-WACA TOGO-223531-CS- CQS / Etude de faisabilité te Component 2: Strengthening Sélection fondée s chnique pour la création et l' IDA / D2860 the Policy and Institutional F A posteriori ur les qualification Open - National 92,000.00 0.00 Annulé 2021-06-30 2021-07-21 2021-09-03 2021-10-03 2021-11-07 2022-05-06 opérationnalisation de l'obse ramework s des consultants rvatoire national sur le littora l 78 / Assistance technique et Component 2: Strengthening Sélection fondée s contrôle des activités commu TF / A7130 the Policy and Institutional F A posteriori ur les qualification Open - National 220,982.00 0.00 Annulé 2020-01-14 2020-01-15 2020-02-04 2020-03-19 2020-04-18 2020-05-23 2020-11-19 nautaires ramework s des consultants Page 6 113 / Etude d'avant projet d étaillé (APD) pour la construc Sélection fondée s Component 4: National Coor tion de la nouvelle direction r IDA / D2860 A posteriori ur les qualification Open - National 40,000.00 0.00 Annulé 2020-07-27 2020-08-17 2020-09-30 2020-10-30 2020-12-04 2021-06-02 dination égionale des forestiers de la s des consultants réserve de faune de Togodo Nord à Atakpamé TG-WACA TOGO-276324-CS- Component 4: National Coor Sélection au moin En attente d'exéc LCS / audit externe 2023 et IDA / D2860 A posteriori Open - National 20,000.00 0.00 2022-08-16 2022-09-06 2022-10-20 2022-11-17 2022-12-17 2023-01-21 2023-02-25 2023-03-27 dination dre coût ution clôture du projet TG-WACA TOGO-276160-CS- Component 3: Strengthening Sélection fondée s QBS / Informatisation du syst Open - Internationa En cours d'exame TF / A7130 National Physical and Social A posteriori ur les qualification 100,000.00 0.00 2022-09-30 2022-02-25 2022-10-21 2022-12-04 2023-01-03 2023-02-07 2023-08-06 ème de suivi-évaluation du M l n Investments s des consultants ERF: Extension du logiciel Ru che au ministère TG-WACA TOGO-276156-CS- Component 2: Strengthening Sélection fondée s QBS / Recrutement d'un cabi Open - Internationa TF / A7130 the Policy and Institutional F A posteriori ur les qualification 100,000.00 0.00 Signé 2022-07-29 2022-05-11 2022-08-19 2022-07-27 2022-10-02 2022-09-15 2022-11-01 2022-11-02 2022-12-06 2022-12-11 2023-06-04 net pour la formation des ag l ramework s des consultants ents du MEMPPC sur la prote ction côtière TG-WACA TOGO-224375-CS- Component 3: Strengthening Sélection fondée s CDS / Etude de faisabilité tec Open - Internationa IDA / 62130 National Physical and Social A posteriori ur la qualité et le 380,000.00 0.00 Signé 2022-09-28 2023-03-14 2022-10-19 2022-12-02 2022-06-06 2022-12-30 2022-06-17 2023-01-29 2022-06-02 2023-03-05 2022-06-20 2023-04-09 2022-07-19 2024-04-08 hnique de la mise en place d' l Investments coût un bypass au port autonome de Lomé TG-WACA TOGO-222420-CS- CQS / Elaboration de la carte Component 2: Strengthening Sélection fondée s de vulnérabilité de la côte to TF / A7130 the Policy and Institutional F A posteriori ur les qualification Open - National 54,545.00 0.00 Annulé 2022-08-24 2022-09-14 2022-10-28 2022-11-27 2023-01-01 2023-04-01 golaise face aux menaces de ramework s des consultants pollution par les hydrocarbur es (ABC) TG-WACA TOGO-308002-CS- CQS / Elaboration de la carte Component 2: Strengthening Sélection fondée s Open - Internationa de vulnérabilité de la côte to TF / A7130 the Policy and Institutional F A posteriori ur les qualification 100,000.00 0.00 Annulé 2022-10-20 2023-01-24 2022-11-10 2023-03-24 2022-12-24 2023-01-23 2023-02-27 2023-08-26 l golaise face aux menaces de ramework s des consultants pollution par les hydrocarbur es (ABC) TG-WACA TOGO-313433-CS- Component 3: Strengthening Sélection fondée s CQS / CONTRÔLE DES TRAVA Open - Internationa IDA / 62130 National Physical and Social A posteriori ur les qualification 990,000.00 0.00 Signé 2022-10-20 2022-09-29 2022-11-10 2022-12-13 2022-12-24 2023-05-19 2023-01-23 2023-07-12 2023-02-27 2023-12-24 UX DE CURAGE MÉCANIQUE l Investments s des consultants DU CHENAL DE GBAGA TG-WACA TOGO-339841-CS- Component 2: Strengthening Sélection fondée s En cours d'exame CQS / Étude architecturale de IDA / D2860 the Policy and Institutional F A posteriori ur la qualité et le Open - National 120,000.00 0.00 2023-04-24 2023-05-15 2023-06-28 2023-07-26 2023-08-25 2023-09-29 2023-11-03 2024-11-02 n la construction du siège de l' ramework coût ANGE TG-WACA TOGO-276163-CS- QBS / Appui à la mise en œu Component 3: Strengthening Sélection fondée s vre du plan d'investissement Open - Internationa IDA / D2860 National Physical and Social A posteriori ur les qualification 100,000.00 0.00 Annulé 2022-09-30 2022-10-21 2022-12-04 2023-01-03 2023-02-07 2023-08-06 des CDN 2030 du Togo pour l l Investments s des consultants 'élaboration d'une stratégie d e développement sobre en c arbone et résilience au CC TG-WACA TOGO-223546-CS- Component 2: Strengthening Sélection fondée s CQS / Elaboration du plan sp IDA / D2860 the Policy and Institutional F A posteriori ur les qualification Open - National 32,000.00 0.00 Annulé 2022-09-26 2022-10-17 2022-11-30 2022-12-30 2023-02-03 2023-06-03 atial marin et côtier ramework s des consultants TG-WACA TOGO-375175-CS- CQS / ETUDE SUR LA DEMAT Component 2: Strengthening Sélection fondée s ERIALISATION DE L’AGENCE Open - Internationa En cours d'exécut IDA / D8460 the Policy and Institutional F A posteriori ur les qualification 100,000.00 0.00 2023-10-31 2023-10-03 2023-11-21 2023-12-21 2024-01-04 2024-02-03 2024-03-09 2024-09-05 NATIONALE DE GESTION DE L l ion ramework s des consultants ’ENVIRONEMENT (Gestion éle ctronique des dossiers d'étud es d'impact) TG-WACA TOGO-375135-CS- CQS / ETUDES TECHNIQUES P OUR LA MISE EN PLACE D’UN Component 3: Strengthening Sélection fondée s Open - Internationa En cours d'exécut PLAN DE GESTION, DE MAINT IDA / 62130 National Physical and Social A posteriori ur la qualité et le 363,000.00 0.00 2023-10-30 2023-09-27 2023-11-20 2023-09-28 2024-01-03 2024-01-31 2024-03-01 2024-04-05 2024-05-10 2024-11-06 l ion ENANCE ET ENTRETIEN DES Investments coût OUVRAGES DE PROTECTION COTIERE INCLUANT UN MOD ELE FINANCIER TG-WACA TOGO-382539-CS- Component 3: Strengthening Sélection fondée s En attente d'exéc QCBS / Contrôle des travaux IDA / D2860 National Physical and Social A posteriori ur la qualité et le Open - National 400,000.00 0.00 2024-02-29 2024-03-21 2024-05-04 2024-06-01 2024-07-01 2024-08-05 2024-09-09 2025-09-09 ution de lutte contre les inondation Investments coût s TG-WACA TOGO-276177-CS- Component 3: Strengthening Sélection fondée s QBS / Mise en valeur de quat Open - Internationa IDA / 62130 National Physical and Social A posteriori ur la qualité et le 363,637.00 0.00 Annulé 2022-09-30 2023-05-01 2022-10-21 2023-05-04 2022-12-04 2023-01-01 2023-01-31 2023-03-07 2023-04-11 2024-04-10 re zones prioritaires du Sché l Investments coût ma d’aménagement du Littor al (SDAL) INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual 1 / Elaboration du Cadre de Component 2: Strengthening Gestion Environnementale et IDA / V1150 the Policy and Institutional F A posteriori Individuel Limited 27,500.00 23,893.15 Signé 2017-07-18 2017-06-22 2017-07-23 2017-09-07 2018-01-29 2017-09-28 2018-03-05 2017-12-18 2018-07-17 Sociale (CGES) ramework 2 / Elaboration du Cadre de Component 2: Strengthening IDA / V1150 A posteriori Individuel Limited 24,000.00 20,223.92 Signé 2017-06-22 2017-06-22 2017-08-24 2017-09-07 2017-09-29 2017-09-29 2017-11-29 2017-12-18 2018-01-12 Politique de Réinstallation (C the Policy and Institutional F PR) ramework 4 / Etude d'impact environne Component 2: Strengthening mental et social des dragage IDA / V1150 the Policy and Institutional F A posteriori Individuel Limited 18,000.00 0.00 Signé 2017-11-12 2017-11-12 2018-01-27 2018-01-22 2018-02-17 2018-05-31 2018-03-24 2018-08-15 2018-04-24 s et de la construction des ou ramework vrages de lutte contre les ino ndations 13 / Elaboration de la straté Sélection de cons Component 4: National Coor gie de passation des marché IDA / V1150 A posteriori ultants par entent Direct 14,000.00 13,130.33 Signé 2017-12-12 2017-12-12 2017-12-22 2017-12-22 2018-02-09 2018-09-03 2018-03-29 dination s (PPSD) e directe 6 / Recrutement d'un spécial Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Annulé 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 iste en passation des marché dination s 8 / Recrutement d'un spécial Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Annulé 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 iste en suivi-évaluation dination 9 / Recrutement d'un spécial Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Annulé 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 iste en sauvegarde sociale dination Page 7 10 / Recrutement d'un spéci Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Annulé 2018-02-20 2018-04-10 2018-05-01 2018-06-05 2018-12-02 aliste en communication dination 9 BIS / Recrutement d'un sp Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Signé 2018-04-26 2018-05-18 2018-06-14 2019-01-25 2018-07-05 2019-05-14 2018-08-09 2019-05-05 2019-02-05 écialiste en sauvegarde socia dination le 10 BIS / Recrutement d'un s Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Signé 2018-06-03 2018-02-18 2018-07-22 2019-04-11 2018-08-12 2019-05-20 2018-09-16 2019-07-15 2019-03-15 pécialiste en communication dination 7 / Recrutement d'un ingéni Component 4: National Coor IDA / V1150 A posteriori Individuel Open 28,000.00 0.00 Signé 2018-05-17 2018-08-13 2018-07-05 2018-07-26 2019-04-15 2018-08-30 2019-05-05 2019-02-26 eur génie civil (génie côtier) dination 27 / Recrutement d'un audit Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Signé 2018-05-24 2019-02-03 2018-07-12 2019-06-25 2018-08-02 2022-02-22 2018-09-06 2023-01-09 2019-03-05 eur interne du projet dination 11 / Recrutement de secréta Component 4: National Coor IDA / V1150 A posteriori Individuel Open 12,000.00 0.00 Annulé 2018-02-20 2018-04-10 2018-05-01 2018-06-05 2018-12-02 ire caissière dination 7- / Recrutement d'un ingéni Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Annulé 2018-02-06 2018-03-27 2018-04-17 2018-05-22 2018-11-18 eur génie civil (génie côtier) dination 3 / Réalisation d'études tech Component 3: Strengthening niques d'ouvrages de lutte co IDA / V1150 National Physical and Social A posteriori Individuel Limited 53,000.00 0.00 Annulé 2017-11-08 2017-11-13 2018-03-26 2018-04-30 2018-10-27 ntre les inondations Investments 12 / Recrutement d'un Assist Component 4: National Coor IDA / V1150 A posteriori Individuel Limited 30,000.00 0.00 Annulé 2017-11-08 2017-11-13 2017-12-04 2018-01-08 2018-07-07 ant technique au projet dination 25 / Recrutement d'un assist Component 4: National Coor IDA / V1150 A posteriori Individuel Open 10,000.00 0.00 Annulé 2018-04-26 2018-06-14 2018-07-05 2018-08-09 2019-02-05 ant en passation des marché dination s 24 BIS / Recrutement d'un s Component 4: National Coor IDA / D2860 A posteriori Individuel Open 24,000.00 0.00 Signé 2018-08-29 2018-09-18 2018-11-02 2018-11-23 2019-02-25 2018-12-28 2019-04-30 2019-06-26 pécialiste en gestion financiè dination re 24 / Recrutement d'un assist Component 4: National Coor IDA / V1150 A posteriori Individuel Open 10,000.00 0.00 Annulé 2018-08-29 2018-10-31 2018-11-21 2018-12-26 2019-06-24 ant au spécialiste en gestion dination financière 6 BIS / Recrutement d'un sp Component 4: National Coor IDA / D2860 A posteriori Individuel Open 24,000.00 37,051.31 Signé 2018-08-27 2018-10-31 2019-02-15 2018-11-21 2019-08-19 2018-12-26 2019-08-22 2019-06-24 écialiste en passation des ma dination rchés 69 / Actualisation des manu Component 2: Strengthening IDA / D2860 A posteriori Individuel Open 13,000.00 13,023.07 Signé 2019-06-17 2019-06-07 2019-08-05 2020-11-17 2019-08-26 2020-11-23 2019-09-30 2021-05-06 2020-03-28 els de procédure de l'ANGE the Policy and Institutional F ramework 67 / Élaboration du plan de d éveloppement des Ressource Component 2: Strengthening s Humaines du Ministère de l' TF / A7130 the Policy and Institutional F A posteriori Individuel Open 15,000.00 0.00 Annulé 2019-06-19 2019-06-17 2019-08-07 2019-08-28 2019-10-02 2020-03-30 Environnement, du Développ ramework ement Durable et de la Prote ction de la Nature 64 / Appui à l'analyse institu tionnelle du Ministère de l'En vironnement, du Développe Component 2: Strengthening ment Durable et de la Protec TF / A7130 the Policy and Institutional F A posteriori Individuel Open 15,000.00 16,668.25 Signé 2019-06-19 2019-06-07 2019-08-07 2020-11-17 2019-08-28 2020-11-23 2019-10-02 2021-05-03 2020-03-30 tion de la Nature relative à la ramework mise en œuvre des conventio ns internationales signées pa r le Togo Component 3: Strengthening 68 / Élaboration du cadre fo TF / A7130 National Physical and Social A posteriori Individuel Open 24,000.00 18,403.19 Signé 2019-06-17 2019-06-07 2019-08-05 2019-11-04 2019-08-26 2019-02-07 2019-09-30 2020-08-27 2020-03-28 nctionnel (procédural) Investments 40B / Surveillance contrôle d es Travaux d'aménagement du R+1 des bureaux pour l'U GP, Construction du mur de s Component 4: National Coor IDA / V1150 A posteriori Individuel Open 9,000.00 0.00 Annulé 2019-06-20 2019-08-08 2019-08-29 2019-10-03 2020-03-31 éparation, d'un parking pour dination 10 voitures, un poste d'héber gement (des compteurs et d u groupe électrogène) et am énagement de la cour 61 / Élaboration des textes d Component 2: Strengthening IDA / D2860 A posteriori Individuel Open 20,000.00 22,801.19 Signé 2019-06-20 2019-06-07 2019-08-08 2020-12-18 2019-08-29 2021-01-04 2019-10-03 2021-04-26 2020-03-31 'application de la loi sur le litt the Policy and Institutional F oral ramework 53 / Recrutement d'un (01) c Component 4: National Coor IDA / D2860 A posteriori Individuel Open 3,500.00 4,603.46 Signé 2019-06-26 2019-08-21 2019-08-14 2020-05-13 2019-09-04 2020-09-03 2019-10-09 2020-09-24 2020-04-06 oursier dination 55 / Recrutement de deux (2 Component 4: National Coor IDA / D2860 A posteriori Individuel Open 9,000.00 20,845.12 Signé 2019-07-12 2019-08-21 2019-08-30 2020-06-02 2019-09-20 2020-07-15 2019-10-25 2020-09-24 2020-04-22 ) chauffeurs de permis catég dination orie B 54 / Recrutement d'un (01) c Component 4: National Coor IDA / D2860 A posteriori Individuel Open 5,500.00 0.00 Annulé 2019-08-22 2019-08-21 2019-10-10 2019-10-31 2019-12-05 2020-06-02 hauffeur de permis catégorie dination C 75 / Recrutement d'un Coord Component 4: National Coor IDA / D2860 A posteriori Individuel Open 33,000.00 40,385.61 Signé 2019-08-19 2019-08-20 2019-10-07 2020-03-04 2019-10-28 2020-03-11 2019-12-02 2020-06-08 2020-05-30 onnateur du projet WACA Re dination sIP 75BIS / Recrutement de coor Component 4: National Coor IDA / D2860 A posteriori Individuel Open 33,000.00 40,486.37 Signé 2019-11-20 2019-11-08 2019-12-23 2020-03-13 2020-01-06 2020-03-25 2020-02-10 2020-05-30 2020-08-08 donnateur pour le projet WA dination CA ResIP 91 / Recrutement d'un secré Component 4: National Coor taire administratif pour l'UGP IDA / D2860 A posteriori Individuel Open 12,000.00 694.31 Signé 2020-04-09 2020-07-30 2020-05-28 2021-03-15 2020-06-18 2021-05-10 2020-07-23 2021-06-27 2021-01-19 dination WACAResIP 89 / Recrutement de consult ant individuel environnement Component 2: Strengthening aliste pour le contrôles des tr TF / A7130 the Policy and Institutional F A posteriori Individuel Open 11,136.00 0.00 Annulé 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 avaux d'aménagement de la ramework cour du MEDDPN et des bure aux de l'UGP (RDC et R+1) 20 / Recrutement d'un spéci Component 4: National Coor IDA / V1150 A posteriori Individuel Open 24,000.00 0.00 Annulé 2018-06-03 2018-07-22 2019-06-25 2018-08-12 2018-09-16 2019-03-15 aliste en développement insti dination tutionnel 111 / Recrutement d'un exp Component 4: National Coor ert en passation de marché p IDA / D2860 A posteriori Individuel Open 28,500.00 34,987.56 Signé 2020-05-29 2020-05-25 2020-07-17 2020-07-23 2020-08-07 2020-10-02 2020-09-11 2020-11-28 2021-09-10 dination our le projet WACA ResIP 115 / Recrutement d'un audi Component 4: National Coor IDA / D2860 A posteriori Individuel Open 17,455.00 0.00 Annulé 2020-06-03 2020-07-22 2020-08-12 2020-09-16 2021-11-30 teur interne pour le projet W dination ACA ResIP Page 8 101 / Recrutement de consul tant individuel génie électro Component 2: Strengthening mécanique pour le contrôle d IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 6,200.00 15,039.77 Signé 2020-07-10 2020-06-16 2020-08-28 2020-09-23 2020-09-18 2021-03-24 2020-10-23 2021-05-07 2021-06-23 es travaux d'aménagement d ramework u cadre de travail de l'ANGE et du bâtiment R+1 de l'UGP WACA ResiP 90 / Recrutement d’un secré taire pour la passation de ma Component 4: National Coor IDA / D2860 A posteriori Individuel Open 12,000.00 11,146.14 Signé 2020-06-30 2020-08-11 2020-08-18 2021-03-15 2020-09-08 2021-05-10 2020-10-13 2021-06-29 2021-04-11 rché et la gestion financière dination du projet WACA ResIP 117 / Recrutement d'un spéc Component 4: National Coor ialiste en communication pou IDA / D2860 A posteriori Individuel Open 24,000.00 0.00 Annulé 2020-08-12 2020-09-30 2020-10-21 2020-11-25 2021-11-24 dination r le projet WACA ResIP 122 / Mise en place d'un sys Component 2: Strengthening tème automatisé de gestion TF / A7130 the Policy and Institutional F A posteriori Individuel Open 15,000.00 30,789.27 Signé 2020-09-30 2021-03-29 2020-11-18 2021-06-28 2020-12-09 2021-08-19 2021-01-13 2021-10-20 2021-04-12 des ressources humaines et f ramework inancières du MEDDPN TG-WACA TOGO-204714-CS- Component 3: Strengthening INDV / élaboration d'un plan TF / A7130 National Physical and Social A posteriori Individuel Limited 20,000.00 25,170.94 Signé 2021-01-28 2020-12-30 2021-02-12 2021-02-04 2021-03-05 2021-06-17 2021-04-09 2021-08-08 2021-05-09 d'aménagement et de gestio Investments n de la forêt classée d'Assév é 99 / Recrutement d'un consu ltant pour la réalisation d'un Component 3: Strengthening plan d'action de réinstallatio IDA / D2860 National Physical and Social A posteriori Individuel Open 22,000.00 0.00 Annulé 2020-04-10 2020-05-29 2020-06-19 2020-07-24 2021-01-20 n du dragage et stabilisation Investments des berges de la lagune et d u lac Togo 95 / Recrutement d'un consu Component 3: Strengthening ltant pour la realisation d'un TF / A7130 National Physical and Social A posteriori Individuel Open 9,091.00 0.00 Annulé 2020-04-09 2020-04-14 2020-05-28 2020-06-18 2020-07-23 2021-01-19 plan d'action de réinstallatio Investments n du complexe d'aires protég ées de TOGODO 102 / Recrutement de consul tant individuel environnemen Component 2: Strengthening taliste pour le contrôle des tr IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 2,727.00 0.00 Annulé 2020-04-09 2020-05-28 2020-06-18 2020-07-23 2021-01-19 avaux d'aménagement du ca ramework dre de travail de l'ANGE 94 / Recrutement de consult ant individuel génie civil pour Component 2: Strengthening le contrôle des travaux IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 4,136.00 0.00 Annulé 2020-06-30 2020-08-18 2020-09-08 2020-10-13 2021-05-12 d'aménagement du cadre de ramework travail de l'ANGE 86 / Recrutement de consult ant individuel génie civil pour Component 2: Strengthening le contrôles des travaux d'a TF / A7130 the Policy and Institutional F A posteriori Individuel Open 18,182.00 0.00 Annulé 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 ménagement de la cour du ramework MEDDPN et des bureaux de l' UGP (RDC et R+1) 80 / Etude d'impact environn Component 3: Strengthening ementale et sociale du compl TF / A7130 National Physical and Social A posteriori Individuel Open 18,182.00 0.00 Annulé 2020-03-19 2020-03-30 2020-05-07 2020-05-28 2020-07-02 2020-12-29 exe d'aires protégées de TO Investments GODO TG-WACA TOGO-222909-CS- Component 4: National Coor INDV / Elaboration du rapport IDA / D2860 A posteriori Individuel Open 46,000.00 35,376.04 Signé 2021-04-15 2021-03-29 2021-06-03 2021-08-04 2021-06-24 2021-08-16 2021-07-29 2021-10-13 2021-08-28 dination d'évaluation à mi-parcours TG-WACA TOGO-222896-CS- Component 4: National Coor INDV / SELECTION D’UN EXPE IDA / D2860 A posteriori Individuel Open 38,000.00 123.63 Signé 2021-06-18 2021-06-01 2021-08-06 2021-09-03 2021-08-27 2021-09-03 2021-10-01 2022-04-01 2022-10-01 dination RT OCEANOGRAPHE – LITTOR ALISTE TG-WACA TOGO-222891-CS- Component 2: Strengthening INDV / Elaboration du plan sp IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 32,000.00 0.00 Annulé 2021-05-20 2021-07-08 2021-07-29 2021-09-02 2021-10-02 atial marin et côtier ramework 51 / Appui à la mise en place Component 2: Strengthening IDA / D2860 A posteriori Individuel Open 30,000.00 0.00 Annulé 2019-02-04 2019-06-05 2019-03-25 2019-04-15 2019-05-20 2019-11-16 du MRV de la zone côtière the Policy and Institutional F ramework TG-WACA TOGO-238696-CS- INDV / Recrutement d'un spé Component 4: National Coor IDA / D2860 A posteriori Individuel Open 27,000.00 0.00 Annulé 2021-07-14 2021-06-07 2021-09-01 2021-09-22 2021-10-27 2022-10-22 cialiste en développement de dination s sous-projet communautaire et AGR pilote TG-WACA TOGO-240809-CS- INDV / RECRUTEMENT D’UN Component 4: National Coor IDA / D2860 A posteriori Individuel Limited 17,455.00 16,663.49 Signé 2021-07-30 2021-06-02 2021-08-04 2021-06-10 2021-08-25 2021-08-12 2021-09-29 2021-10-12 2021-11-04 ASSISTANT A LA MISE EN ŒU dination VRE DES ACTIVITES GENERA TRICES DE REVENUS TG-WACA TOGO-240217-CS- INDV / ELABORATION DU PLA Component 3: Strengthening N D’ACTION POUR LA RESTRI TF / A7130 National Physical and Social A posteriori Individuel Open 54,545.00 40,571.91 Signé 2021-09-30 2021-08-06 2021-11-18 2022-03-15 2021-12-09 2022-04-22 2022-01-13 2022-06-19 2022-04-13 CTION D’ACCES AUX RESSOU Investments RCES DES ECOSYSTEMES FO RESTIERS DE LA ZONE LITTO RALE DU TOGO 87 / Recrutement de consult ant individuel génie electro- Component 2: Strengthening mécanique pour le contrôles TF / A7130 the Policy and Institutional F A posteriori Individuel Open 18,182.00 0.00 Annulé 2020-04-15 2020-06-03 2020-06-24 2020-07-29 2021-01-25 des travaux d'aménagement ramework de la cour du MEDDPN et de s bureaux de l'UGP (RDC et R +1) TG-WACA TOGO-260449-CS- INDV / recrutement d'un cons Component 3: Strengthening ultant individuel pour l'appui En cours d'exame TF / A7130 National Physical and Social A posteriori Individuel Open 35,000.00 0.00 2022-08-23 2022-03-17 2022-10-11 2022-11-01 2022-12-06 2023-06-04 à l’aménagement des périmè n Investments tres maraichers de 04 sous p rojets communautaires TG-WACA TOGO-260444-CS- INDV / IDENTIFICATION, ELAB ORATION DES SPECIFICATION Component 3: Strengthening S TECHNIQUES ET DETERMIN TF / A7130 National Physical and Social A posteriori Individuel Open 27,000.00 0.00 Signé 2022-07-26 2021-11-23 2022-08-31 2023-07-12 2022-09-21 2023-07-26 2022-10-26 2022-10-10 2022-11-25 ATION DES COÛTS DES EQUI Investments PEMENTS POUR LE DEVELOP PEMENT DES FILIERES AGRIC OLES Page 9 TG-WACA TOGO-222416-CS- Component 2: Strengthening INDV / Etude pour la mise en IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 30,000.00 0.00 Signé 2022-08-24 2022-01-26 2022-10-13 2022-06-28 2022-11-03 2022-07-28 2022-12-08 2022-11-23 2023-01-07 place du MRV de la zone côti ramework ère TG-WACA TOGO-299627-CS- Component 2: Strengthening INDV / RÉALISATION D’UNE IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 45,000.00 0.00 Signé 2022-07-27 2022-06-06 2022-09-14 2022-10-12 2022-10-05 2022-12-23 2022-11-09 2023-03-28 2023-05-08 WEB CARTOGRAPHIE DU PRO ramework JET WACA ResIP TG-WACA TOGO-306645-CS- Component 3: Strengthening Sélection de cons CDS / Actualisation de l'étud Direct - Internation IDA / 62130 National Physical and Social A posteriori ultants par entent 110,000.00 0.00 Signé 2022-09-30 2022-09-13 2022-10-10 2022-09-14 2022-12-05 2022-12-28 2023-02-03 e de faisabilité technique de l al Investments e directe a protection côtière: tronçon Agbodrafo-Gbodjomé TG-WACA TOGO-306628-CS- CDS / Actualisation de l'étud Component 3: Strengthening Sélection de cons Direct - Internation e d'impact environnemental IDA / 62130 National Physical and Social A posteriori ultants par entent 120,000.00 0.00 Signé 2022-09-30 2022-09-28 2022-10-10 2022-09-12 2022-12-05 2023-01-29 2023-03-05 al et social du tronçon Agbodraf Investments e directe o-Gbodjomé et élaboration d u PAR TG-WACA TOGO-332877-CS- INDV / ELABORATION DE L’A DDENDUM AU PLAN D’ACTIO Component 3: Strengthening NS DE RÉINSTALLATION (PAR En cours d'exécut IDA / 62130 National Physical and Social A posteriori Individuel Limited 30,000.00 0.00 2023-01-24 2022-11-16 2023-01-29 2023-02-19 2023-03-26 2023-09-22 ) DES PERSONNES AFFECTÉE ion Investments S DANS LE CADRE DES TRAV AUX DE PROTECTION DU SEG MENT DE CÔTE SITUE ENTRE AGBODRAFO ET ANEHO TG-WACA TOGO-223541-CS- INDV / Actualisation du plan Component 2: Strengthening d’action pour le développem IDA / D2860 the Policy and Institutional F A posteriori Individuel Open - National 27,273.00 0.00 Signé 2021-05-28 2022-05-09 2021-07-16 2022-12-23 2021-08-06 2022-12-23 2021-09-10 2023-02-19 2021-10-10 ent et l’adaptation aux chang ramework ements climatiques du littora l togolais TG-WACA TOGO-346060-CS- Component 2: Strengthening INDV / REALISATION DE L'ET TF / A7130 the Policy and Institutional F A posteriori Individuel Open - National 13,000.00 0.00 Annulé 2023-05-30 2023-05-02 2023-07-18 2023-08-08 2023-09-12 2024-03-10 UDE DE SATISFACTION DES B ramework ENEFICAIRES DU PROJET WA CA ResIP TG-WACA TOGO-355432-CS- Component 3: Strengthening INDV / élaboration d'une stra IDA / D2860 National Physical and Social A posteriori Individuel Open - National 60,000.00 0.00 Annulé 2023-05-15 2022-10-10 2023-07-03 2023-07-24 2023-08-28 2024-02-24 tégie de développement sobr Investments e en carbone et résilience au CC TG-WACA TOGO-356038-CS- Component 3: Strengthening INDV / Réalisation de l'EIES si En cours d'exécut IDA / 62130 National Physical and Social A posteriori Individuel Limited 30,000.00 0.00 2023-05-30 2023-04-21 2023-06-04 2023-06-25 2023-07-30 2024-01-26 mplifié des activités du sous ion Investments projet d'AGR pilote noix de C oco 50 / Etude pour la mise en pl ace du système national d'inf Component 2: Strengthening ormations côtières (Définitio IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 70,000.00 0.00 Annulé 2019-04-02 2019-06-05 2019-05-21 2019-06-11 2019-07-16 2020-01-12 n et harmonisation des stand ramework ards de collecte, traitement e t diffusion de données pour l' observatoire) 106 / Recrutement d'un cons ultant pour la réalisation de l' EIES du projet d'assainissem Component 3: Strengthening ent des eaux usées à la plag IDA / D2860 National Physical and Social A posteriori Individuel Open 50,000.00 0.00 Annulé 2020-06-02 2020-11-11 2020-07-21 2020-08-11 2020-09-15 2021-01-15 e de Lomé, réhabilitation du r Investments éseau embryonnaire d'assain issement collectif des eaux u sées de la ville de Lomé-Tog o TG-WACA TOGO-276167-CS- Component 2: Strengthening INDV / Appui à la révision de IDA / D2860 the Policy and Institutional F A posteriori Individuel Open 20,000.00 0.00 Annulé 2022-07-15 2022-09-02 2022-09-23 2022-10-28 2023-04-26 la loi cadre sur l'environnem ramework ent et l'élaboration de ses te xtes d'application TG-WACA TOGO-375144-CS- Component 3: Strengthening INDV / AUDIT DE MISE EN OE En attente d'exéc IDA / 62130 National Physical and Social A posteriori Individuel Limited 40,000.00 0.00 2023-09-30 2023-10-05 2023-10-26 2023-11-30 2024-05-28 UVRE DU PAR TRAVAUX DE P ution Investments ROTECTION A LONG TERME A GBODRAFO-ANEHO TG-WACA TOGO-375158-CS- Component 2: Strengthening INDV / Recrutement d'un hyd En attente d'exéc IDA / D8460 the Policy and Institutional F A posteriori Individuel Limited 12,000.00 0.00 2023-09-29 2023-10-04 2023-10-25 2023-11-29 2024-05-27 rogéologue pour le suivi des ution ramework travaux de forage TG-WACA TOGO-379506-CS- Component 2: Strengthening INDV / REALISATION DE L'ET TF / A7130 the Policy and Institutional F A posteriori Individuel Open - National 30,000.00 0.00 Signé 2023-11-30 2023-03-02 2024-01-18 2023-08-08 2024-02-08 2023-08-08 2024-03-14 2024-09-10 UDE DE SATISFACTION DES B ramework ENEFICAIRES DU PROJET WA CA ResIP TG-WACA TOGO-381392-CS- INDV / CONTROLE ET SURVEI Component 3: Strengthening LLANCE DES TRAVAUX D’AM En attente d'exéc IDA / D2860 National Physical and Social A posteriori Individuel Open - National 10,000.00 0.00 2023-11-30 2024-01-18 2024-02-08 2024-03-14 2024-09-10 ENAGEMENT DE PISTE DANS ution Investments LA FORET DE TOGODO DANS LE CADRE DE WACA ResIP TO GO TG-WACA TOGO-382119-CS- Component 3: Strengthening INDV / élaboration d’une stra Open - Internationa En cours d'exécut IDA / D2860 National Physical and Social A posteriori Individuel 60,000.00 0.00 2024-01-31 2023-10-10 2024-03-20 2024-04-10 2024-05-15 2024-11-11 tégie de développement sobr l ion Investments e en carbone et résilience au Crédit carbone TG-WACA TOGO-389174-CS- Component 3: Strengthening INDV / Audit de la mise en œ En attente d'exéc IDA / 62130 National Physical and Social A posteriori Individuel Limited 30,000.00 0.00 2023-12-28 2024-01-02 2024-01-23 2024-02-27 2024-08-25 uvre de l'EIES de la protectio ution Investments n côtière Agbodrafo Sanvé co ndji TG-WACA TOGO-400841-CS- Component 3: Strengthening INDV / Recrutement de 7 con En attente d'exéc IDA / D2860 National Physical and Social A posteriori Individuel Open - National 50,000.00 0.00 2024-02-20 2024-04-09 2024-04-30 2024-06-04 2024-12-01 trôleurs permanent pour le c ution Investments ontrôle des principaux chanti ers en cours Page 10