The World Bank Implementation Status & Results Report Tanzania Renewable Energy CDM Program of Activities (P127585) Tanzania Renewable Energy CDM Program of Activities (P127585) EASTERN AND SOUTHERN AFRICA | Tanzania | Energy & Extractives Global Practice | Recipient Executed Activities | Investment Project Financing | FY 2014 | Seq No: 6 | ARCHIVED on 22-May-2023 | ISR56300 | Implementing Agencies: REPUBLIC OF TANZANIA, Rural Energy Agency Key Dates Key Project Dates Bank Approval Date: 25-Apr-2014 Effectiveness Date: 31-Mar-2014 Planned Mid Term Review Date: -- Actual Mid-Term Review Date: Original Closing Date: 31-Dec-2023 Revised Closing Date: 31-Dec-2023 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The objective of the CDM-PoA project is to increase the capacity of renewable energies installed - including hydro, solar, wind and/or biomass technologies for electricity generation. The subprojects can be: isolated mini-grids, connected to the national grid or connected to one of the national utility’s isolated grids. Over the long term, this will lead to increased access to modern energy services in Tanzania. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating Low Low Implementation Status and Key Decisions The Clean Development Mechanism (CDM) Program of Activities (PoA) was registered on May 8, 2014. Nine CDM Component Project Activities (sub-projects) were included in the CDM PoA by the United Nations Framework Convention on Climate Change of which five sub-projects were operating as of December 31, 2020 and are generating Certified Emission Reductions (CERs). The first verification of the five operating sub-projects for the period of 2015-2016 yielded 16,834 CERs. The second verification (2017) yielded 19,871 CERs. The third verification (2018) yielded 23,149 CERs. The fourth and final verification of the Emission Reductions generated during the period January 2019 to December 2020 has been completed and is awaiting issuance of the final batch of CERs under the CDM PoA. 5/22/2023 Page 1 of 4 The World Bank Implementation Status & Results Report Tanzania Renewable Energy CDM Program of Activities (P127585) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- Low Low Macroeconomic -- Low Low Sector Strategies and Policies -- Low Low Technical Design of Project or Program -- Low Low Institutional Capacity for Implementation and -- Low Low Sustainability Fiduciary -- Low Low Environment and Social -- Moderate Moderate Stakeholders -- Low Low Other -- -- -- Overall -- Low Low Results PDO Indicators by Objectives / Outcomes Greenhouse gas emission reduction achieved IN01295180 ►Reduce greenhouse gas emissions by 116,268 tCO2e from 2015 to 2020 from the displacement of fossil fuel electricity generation through the generation of small hydropower in Tanzania. (Metric ton, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 59,854.00 59,854.00 116,268.00 Date 01-Dec-2015 08-Dec-2022 16-May-2023 31-Dec-2023 Intermediate Results Indicators by Components Renewable energy generation capacity IN01295256 ►Installed renewable energy generation capacity (Megawatt, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 12.00 12.00 12.00 Date 01-Jan-2014 08-Dec-2022 16-May-2023 31-Dec-2023 5/22/2023 Page 2 of 4 The World Bank Implementation Status & Results Report Tanzania Renewable Energy CDM Program of Activities (P127585) Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P127585 TF-16921 Effective USD 4.53 1.01 3.52 0.32 0.33 31% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P127585 TF-16921 Effective 31-Mar-2014 31-Mar-2014 31-Mar-2014 31-Dec-2023 31-Dec-2023 Cumulative Disbursements 5/22/2023 Page 3 of 4 The World Bank Implementation Status & Results Report Tanzania Renewable Energy CDM Program of Activities (P127585) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 5/22/2023 Page 4 of 4