Procurement Plan I. General 1. Bank’s approval Date of the procurement Plan: Mat negotiations May 28, 2019. 2. Date of General Procurement Notice: to be published I Aug/Sep 2019 3. Period covered by this procurement plan: The procurement period of project covered from year Aug 2019-Sep 2020 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for Procurement for Moderate Risk Projects: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) US$ 4 million All 2. NCB (Goods) US$ 4 million All 3. ICB (Works) US$ 15 million All 4. NCB (Works) US$ 15 million All 5. (Non-Consultant Services) US$ 4 million All 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/Procurement Manual: Procurement Manual is being prepared and shall be discussed in Aug 17 2019 mission. 4. Any Other Special Procurement Arrangements: Not Applicable 5. Summary of the Procurement Packages planned during the first 18 months after project effectiveness The main contract include three works contracts and one IT contract. The procurement activity table is annexed. Aug 8, 2017 III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Comments Threshold 1. Competitive Methods (Firms) Above US$ 2 m 2. Single Source (Firms) Above US $ 2 m Justification alongwith identification of SSS in procurement plan 3. Individual Above US$ 400, 000 In addition the selection of procurement staff 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_500,000_equivalent per contract, may comprise entirely of national consultants in accordance with the OPCS guidance. 3. Any Other Special Selection Arrangements: [including advance procurement and retroactive financing, if applicable or delete if not applicable] 4. Consultancy Assignments with Selection Methods and Time Schedule: There are a number of activities for consultancy contracts. The procurement activity table is annexed which indicted the identified activities. Aug 8, 2017 Procurement Activities S Ref Activity Est Procuremen Risk Review N No cost t Approach Type USD m Component 1 1 1a Design of and HR plan 1.5 Consultancy Substantial Prior &1b and trainings to KWSB QCBS staff, Software and hardware of HR system 2 2a, b Design and impl. of 1.2 Consultancy Moderate Post communication and QCBS customer relation strategy programs 3 2c Construction of six 0.65 Works NCB Low Post service centers 4 2b Design and Superv. 0.05 Consultancy Low Post Firm for above CQS 5 3a Development of a GIS 0.95 IT contract Moderate Post 6 3b Design and 1 Consultancy Moderate Post Implementation of an QCBS Asset Management Program 7 4a & Customer survey, tariff 1 Consultancy Moderate Post 4b review, revised billing QCBS system 8 5a & Design of NRW 1.5 Consultancy Substantial Prior 5b program and metering QCBS system 9 6a & Strategy for Katchi 1.1 Consultancy Substantial Prior 6b abadi cell and gender QCBS action program 10 7a Monitoring industrial 0.7 Consultancy Substantial Post discharge into QCBS sewerage and storm water; Drafting of indirect (industrial) discharge regulations into the sewerage; Priority sewer lines condition survey and rehabilitation design (incl. trenchless) 11 8 Study on FM best 0.3 Consultancy Moderate Post practices CQS Component 2 12 1 Rehabilitating water 5 Works NCB low Post supply and/or sewerage in three low income communities Aug 8, 2017 S Ref Activity Est Procuremen Risk Review N No cost t Approach Type USD m 13 2 Priority sewer network 16 Works NCB Moderate Prior rehabilitation 14 3 Priority Water Network 20 Works NCB Moderate Prior Rehabilitation including meters & DMAs to reduce NRW 15 4 Reducing energy 19 Supply & Moderate Prior consumption install ICB 16 5 Sewage Suction and 10 Goods ICB Moderate Prior Jetting Trucks Component 3 17 1 Preparing specific 2.5 Consultancy Moderate Prior safeguard documents QCBS for SOP 2 18 2 Project Management 3 Consultancy Substantial Prior Consultants QCBS 19 3 Design & Tender 2 Consultancy Moderate Prior Documents and QCBS supervision for SOP-1 19 4 Conduct Energy Audit 0.5 Consultancy Substantial Post QCBS 20 5, 6 PPP Options Study for 2.0 Consultancy Substantial Prior NRW Reduction; QCBS Options Study and/or transaction advice for PPP operation and investment for desalination and/or wastewater reuse 21 7 Rapid Groundwater 0.5 Consultancy Moderate Post Protection Assessment QCBS 22 8 Updating of KWSB’s 4.0 Consultancy Moderate Prior Masterplan QCBS 23 9 Feasibility & Tender 4.0 Consultancy Substantial Prior Documents for QCBS selected investments under SOP 2 24 PIU staff for FM; 1.5 Individual Moderate Post procurement and Consultants contract management; technical support; social env; communications Aug 8, 2017 PROCUREMENT Pakistan : Karachi Water and Sewerage Services Improvement Project (KWSSIP) PLAN General Information Country: Pakistan 2019-11-16 Bank’s Approval Date of the Original Procurement Plan: 2024-05-13 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P164704 GPN Date: 2019-10-30 Project Name: Karachi Water and Sewerage Services Improvement Project (KWSSIP) Loan / Credit No: IBRD / 89940 Karachi Water and Sewerage Board Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned PK-KWSB-200911-CW-RFQ / Operational & Enabling Envir Request for Quota Single Stage - One E 2021-04-1 Rehabilitation & Refurbishme IBRD / 89940 Post Open - National 90,000.00 0.00 Signed 2020-12-15 2020-11-23 2021-02-09 2020-12-10 onment Reform tions nvelope 0 nt of Project Implementation Unit PIU Office PK-KWSB-309204-CW-RFB / Request for Bids - Package KA-1 Rehabilitating Operational & Enabling Envir Single Stage - One E Small Works SPD 11,020,000.0 2023-06-1 Water Supply and Sewerage i IBRD / 89940 Post Request for Bids Open - National 0.00 Canceled 2022-08-28 2022-09-02 2022-10-14 2022-11-13 2022-12-18 onment Reform nvelope (1 envelope proce 0 6 n Tekri Village under LOT-1 w ss) orks and Soba Nagar, Gohara bad under LOT-2 works. Request for Bids - PK-KWSB-309246-CW-RFB / Operational & Enabling Envir Single Stage - One E Small Works SPD 2024-01-0 IBRD / 89940 Post Request for Bids Open - National 700,000.00 0.00 Canceled 2023-03-15 2023-03-20 2023-05-01 2023-05-31 2023-07-05 Construction of Six Service C onment Reform nvelope (1 envelope proce 1 enters. ss) PK-KWSB-316201-CW-RFB / Request for Bids - Package KA-1 Rehabilitating Single Stage - One E Small Works SPD 11,020,000.0 2024-03-1 Water Supply and Sewerage i IBRD / 89940 Infrastructure Investments Prior Request for Bids Open - National 0.00 Canceled 2022-09-19 2022-09-24 2022-11-05 2022-12-05 2023-01-09 nvelope (1 envelope proce 0 9 n Tekri Village under LOT-1 w ss) orks and Soba Nagar, Gohara bad under LOT-2 works. PK-KWSB-320941-CW-RFQ / Request for Quota Package-I: Repair/Replaceme Request for Quota Single Stage - One E tions - Small Work 2022-12-2 nt of Damaged Sections of W IBRD / 89940 Infrastructure Investments Post Open - National 6,000,000.00 0.00 Canceled 2022-10-14 2022-10-26 tions nvelope s (Emergency) SP 5 ater Lines and Sewers on Peo D -Competitive ples Bus Service Routes in Di fferent Districts of Karachi PK-KWSB-320972-CW-RFQ / Request for Quota Package-II: Repair/Replacem Request for Quota Single Stage - One E tions - Small Work 2023-01-0 ent of Damaged Sections of IBRD / 89940 Infrastructure Investments Post Open - National 4,000,000.00 0.00 Signed 2022-10-25 2022-11-10 2022-11-07 2023-02-19 tions nvelope s (Emergency) SP 6 Water Lines and Sewers in Di D -Competitive fferent Districts of Karachi PK-KWSB-323866-CW-RFQ / Package-I: Repair/Replaceme nt of Damaged Sections of W Request for Quota ater Lines and Sewers on Peo Request for Quota Single Stage - One E tions - Small Work 2023-01-2 IBRD / 89940 Infrastructure Investments Post Open - National 6,000,000.00 0.00 Signed 2022-10-28 2022-10-31 2022-11-26 2022-12-22 ples Bus Service Routes in Di tions nvelope s (Emergency) SP 5 fferent Districts of Karachi D -Competitive Lot-1 [District East] Lot-2 [District Korangi & Malir ] Lot-3 [District Central & Kem ari] PK-KWSB-325427-GO-RFB / Contract Package G-1 Request for Bids - Open - Internationa Single Stage - One E 10,550,000.0 2025-06-3 Supply and Installation of Bul IBRD / 89940 Infrastructure Investments Prior Request for Bids Plant SPD (withou 0.00 Canceled 2022-11-09 2022-11-27 2022-11-10 2022-12-01 2022-12-22 2023-03-07 2023-01-21 2023-09-05 2023-02-25 l nvelope 0 0 k Flow Meters t prequalification) under Component-2, SOP-I PK-KWSB-320984-CW-RFQ / Package-III: Repair/Replacem ent of Damaged Sections of Water Lines and Sewers in Di Request for Quota fferent Districts of Karachi Request for Quota Single Stage - One E tions - Small Work 2023-01-1 IBRD / 89940 Infrastructure Investments Post Open - National 2,500,000.00 0.00 Canceled 2022-11-04 2022-11-23 2022-11-16 Lot-1 [District West] tions nvelope s (Emergency) SP 5 Lot-2 [District South] D -Competitive Lot-3 [District Keamari] Lot-4 [Manhole Cover with Ri ng Slab] PK-KWSB-321023-CW-RFB / Construction and Protection/ Request for Bids - Rehabilitation work for G.K C Single Stage - One E Small Works SPD 10,920,000.0 2023-08-0 IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 0.00 Signed 2022-12-05 2023-02-17 2022-12-10 2023-02-17 2023-01-09 2023-03-31 2023-02-08 2023-06-15 2023-03-15 2023-08-26 onduit, K-11, K-11I, 84" diam nvelope (1 envelope proce 0 2 eter Balance Convince and 3 ss) 6" diameter Malir main at Ma lir River Bed Phase-I and Pha se-Ill PK-KWSB-320993-CW-RFB / REPLACEMENT OF RISING MA Request for Bids - IN NO: 05 WITH X-42 GRADE Single Stage - One E Small Works SPD 2024-07-1 IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 7,000,000.00 0.00 Signed 2023-03-16 2023-03-15 2023-03-21 2023-03-24 2023-04-20 2023-05-09 2023-05-20 2023-12-12 2023-06-24 2024-01-18 STEEL 72” (1800MM) DIA MS nvelope (1 envelope proce 7 RISING MAIN FROM DHABEJI ss) PUMPING COMPLEX TO FORE BAY HIGH POINT. PK-KWSB-351424-CW-RFQ / Package-III: Repair/Replacem ent of Damaged Sections of Water Lines and Sewers in Di Request for Quota fferent Districts of Karachi Request for Quota Single Stage - One E tions - Small Work 2023-11-1 IBRD / 89940 Infrastructure Investments Post Open - National 2,500,000.00 0.00 Signed 2023-03-26 2023-05-21 2023-02-19 Lot-1 [District West] tions nvelope s (Emergency) SP 7 Lot-2 [District South] D -Competitive Lot-3 [District Keamari] Lot-4 [Manhole Cover with Ri ng Slab] PK-KWSB-200906-CW-RFB / Request for Bids - Contract Package G-2: Suppl Operational & Enabling Envir Open - Internationa Single Stage - One E 2024-09-2 IBRD / 89940 Post Request for Bids Plant SPD (withou 1,114,341.00 0.00 Signed 2023-06-01 2023-06-05 2023-06-06 2023-06-05 2023-07-18 2023-07-24 2023-08-17 2023-10-20 2023-09-21 2023-12-08 y and Installation of Intermitt onment Reform l nvelope 0 t prequalification) ent Chlorination Stations und er Component-2, SoP-I Request for Bids - PK-KWSB-366239-CW-RFB / Single Stage - One E Small Works SPD 2024-10-0 Package KA-1: Rehabilitating IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 1,260,000.00 0.00 Signed 2023-06-12 2023-09-13 2023-06-17 2023-09-08 2023-07-29 2023-10-06 2023-08-28 2023-11-20 2023-10-02 2023-12-26 nvelope (1 envelope proce 1 Water Supply and Sewerage i ss) n Soba Nagar Request for Bids - PK-KWSB-309186-CW-RFB / Single Stage - One E Small Works SPD 2024-09-2 Contract Package S-1-Priority IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 1,600,000.00 0.00 Signed 2023-06-20 2023-11-08 2023-06-25 2023-11-02 2023-07-25 2023-11-27 2023-08-24 2023-12-18 2023-09-28 2024-01-31 nvelope (1 envelope proce 7 Sewer Network Rehabilitation ss) of Teen Hatti Page 1 Request for Bids - PK-KWSB-369067-CW-RFB / Single Stage - One E Small Works SPD 2024-10-2 Package KA-2: Rehabilitating IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 2,300,000.00 0.00 Signed 2023-07-13 2023-09-26 2023-07-18 2023-09-27 2023-08-17 2023-10-23 2023-09-16 2023-11-21 2023-10-21 2023-12-26 nvelope (1 envelope proce 0 Water Supply and Sewerage i ss) n Essa Nagri Request for Bids - PK-KWSB-309250-CW-RFB / Single Stage - One E Small Works SPD Pending Imp 2024-07-1 Priority Water Network Reha IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 2,400,000.00 0.00 2023-10-01 2023-10-06 2023-11-17 2023-12-17 2024-01-21 nvelope (1 envelope proce lementation 9 bilitation - 3 DMAs ss) PK-KWSB-200902-CW-RFB / Priority Water Network Reha Request for Bids - bilitation ( Supply& Install Wa Open - Internationa Single Stage - One E 2025-04-3 IBRD / 89940 Infrastructure Investments Post Request for Bids Plant SPD (withou 2,200,000.00 0.00 Canceled 2023-09-01 2023-09-06 2023-10-18 2023-11-17 2023-12-22 ter Meters to Bulk Customer l nvelope 0 t prequalification) s) Package- I-1600 large diamet ers meters PK-KWSB-379183-CW-RFB / Priority Water Network Reha Request for Bids - Open - Internationa Single Stage - One E 2025-06-2 bilitation ( Supply& Install Wa IBRD / 89940 Infrastructure Investments Post Request for Bids Plant SPD (withou 5,800,000.00 0.00 Canceled 2023-09-20 2023-09-25 2023-11-06 2023-12-06 2024-01-10 l nvelope 5 ter Meters to Bulk Customer t prequalification) s) Package- II-5858 meters PK-KWSB-379184-CW-RFB / Request for Bids - Rehabilitation/ Construction Single Stage - One E Small Works SPD 2024-06-1 of Parking shed for Sewage S IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 250,000.00 0.00 Canceled 2023-09-04 2023-09-09 2023-10-09 2023-11-08 2023-12-13 nvelope (1 envelope proce 0 uction and Jetting Trucks, Wo ss) rkshop at CWD 9th Mile Shah rah -e- Faisal PK-KWSB-379197-CW-RFB / Replacement of damaged se ction of 72" dia, 66" dia and Request for Bids - 54" dia old Pipri water main Single Stage - One E Small Works SPD 2024-12-2 IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 9,000,000.00 0.00 Signed 2023-09-15 2023-12-28 2023-09-20 2023-12-15 2023-10-20 2024-01-12 2023-11-19 2024-03-19 2023-12-24 with X42 grade mild steel pip nvelope (1 envelope proce 3 e and rehabilitation /strength ss) ening of 48" dia PRCC pipe jo ints at existing old Pipri wate r Main with allied works PK-KWSB-391143-CW-RFB / PACKAGE-2: Civil Works and I nstallation of Flow Meters an d SCADA System Request for Bids - LOT-1: (Consumer Flow Mete Single Stage - One E Small Works SPD Under Imple 2024-08-2 rs) Civil Works and Installatio IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 7,590,000.00 0.00 2023-11-08 2023-11-27 2023-11-13 2023-11-22 2023-12-25 2023-12-18 2024-01-24 2024-02-28 nvelope (1 envelope proce mentation 6 n of Flow Meters ss) LOT-2: (Bulk Flow Meters) Civ il Works and Installation of Fl ow Meters LOT-3: (SCADA System for Bu lk and Con PK-KWSB-404600-CW-RFB / Package 2 (A)--(Consumer Fl ow Meters) Civil Works and In stallation in: Request for Bids - LOT-1—Landhi & Bin Qasim I Single Stage - One E Small Works SPD Under Imple 2025-05-1 ndustrial Areas IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 3,852,355.00 0.00 2024-02-05 2024-02-29 2024-02-10 2024-02-27 2024-03-11 2024-04-26 2024-04-10 2024-05-15 nvelope (1 envelope proce mentation 6 LOT-2 –Cattle Colony ss) LOT-3 –North Karachi Industri al Area LOT-4—F. B. Industrial Area a nd Misc. (SCADA Installation- Bulk/Consumer Meters) PK-KWSB-412684-CW-RFB / Construction Projects Packag e LOT-1: Center of Reform, Res earch and Innovation [CERRI] Operational & Enabling Envir Single Stage - One E Other (with field f Under Imple 2025-06-1 IBRD / 89940 Post Request for Bids Open - National 9,250,000.00 0.00 2024-03-12 2024-03-28 2024-03-12 2024-03-22 2024-04-11 2024-04-26 2024-05-11 2024-06-15 Building [US$ 5.1 M] onment Reform nvelope or explanation) mentation 5 LOT: 2: Parking shed for S & J Trucks at central workshop a nd other locations [US$ 2.5 M ] LOT-3: Three (03) Customer Service Centers [US$ 1.65 M] PK-KWSB-368997-CW-RFB / Request for Bids - Construction of Center of Ref Operational & Enabling Envir Single Stage - One E Small Works SPD 2024-10-1 IBRD / 89940 Post Request for Bids Open - National 3,000,000.00 0.00 Canceled 2023-06-26 2023-07-01 2023-08-12 2023-09-11 2023-10-16 orm, Research and Innovatio onment Reform nvelope (1 envelope proce 5 n (CERRI) Building at Shahra ss) h-e-Faisal, Karachi Request for Bids - PK-KWSB-369068-CW-RFB / Operational & Enabling Envir Single Stage - One E Small Works SPD 2024-04-0 Construction of Six Customer IBRD / 89940 Post Request for Bids Open - National 1,000,000.00 0.00 Canceled 2023-06-30 2023-07-05 2023-08-04 2023-09-03 2023-10-08 onment Reform nvelope (1 envelope proce 5 Service Centers ss) PK-KWSB-390036-CW-RFB / Request for Bids - Rehabilitation/ Construction Single Stage - One E Small Works SPD 2024-08-1 of Parking shed for Sewage S IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 250,000.00 0.00 Canceled 2023-11-10 2023-11-15 2023-12-15 2024-01-14 2024-02-18 nvelope (1 envelope proce 6 uction and Jetting Trucks, Wo ss) rkshop at CWD 9th Mile Shah rah -e- Faisal GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-KWSB-142705-CS-QCBS / Operational & Enabling Envir Single Stage - One E Procurement of 14 Pairs of S IBRD / 89940 Prior Request for Bids Open - National 5,000,000.00 4,126,718.96 Signed 2019-12-10 2020-01-17 2019-12-15 2020-05-13 2020-01-26 2020-06-16 2020-02-25 2020-09-13 2020-03-31 2020-12-19 2020-09-27 onment Reform nvelope ewage Suction and Jetting Tr ucks PK-KWSB-200916-GO-RFQ / Procurement of Furniture and Operational & Enabling Envir Request for Quota Single Stage - One E IBRD / 89940 Post Open - National 25,000.00 0.00 Signed 2020-12-15 2021-02-15 2021-02-09 2021-03-13 2021-02-15 Fixtures for Project Impleme onment Reform tions nvelope ntation Unit PIU Office PK-KWSB-200869-GO-RFB / Operational & Enabling Envir Open - Internationa Single Stage - One E Procurement of Sewage Sucti IBRD / 89940 Prior Request for Bids 6,000,000.00 5,049,573.35 Signed 2020-12-30 2021-05-19 2021-01-04 2021-05-31 2021-02-15 2021-07-15 2021-03-17 2021-11-24 2021-04-21 2022-02-01 2021-10-18 onment Reform l nvelope on and Jetting Trucks (2nd St age) PK-KWSB-200930-GO-RFQ / Procurement of Transport fo Operational & Enabling Envir Request for Quota Single Stage - One E Under Imple IBRD / 89940 Post Open - National 180,000.00 0.00 2020-11-06 2021-03-09 2021-01-01 2021-06-30 r PIU Staff will be procured u onment Reform tions nvelope mentation nder separate contracts in tw o different LOTS. PK-KWSB-217362-GO-RFQ / Procurement and Installation Operational & Enabling Envir Request for Quota Single Stage - One E Pending Impl IBRD / 89940 Post Limited 6,000.00 0.00 2021-10-05 2021-11-30 2022-05-29 of Photocopier Machine for K onment Reform tions nvelope ementation WSSIP Project Implementatio n Unit (PIU Office). Page 2 PK-KWSB-200921-GO-RFQ / Operational & Enabling Envir Request for Quota Single Stage - One E Procurement of IT Equipmen IBRD / 89940 Post Limited 26,000.00 25,773.42 Signed 2021-09-29 2021-10-13 2021-11-24 2021-11-06 2022-05-23 onment Reform tions nvelope t for Project Implementation Unit (PIU Office). PK-KWSB-217357-GO-RFQ / Procurement and Installation Operational & Enabling Envir Request for Quota Single Stage - One E IBRD / 89940 Post Limited 8,000.00 7,794.81 Signed 2021-10-02 2021-10-08 2021-11-27 2021-10-29 2022-05-26 of Air Conditioners (AC's) at K onment Reform tions nvelope WSSIP Project Implementatio n Unit (PIU Office). PK-KWSB-311899-GO-RFQ / Procurement of Office Equip Operational & Enabling Envir Request for Quota Single Stage - One E IBRD / 89940 Post Open - National 24,000.00 0.00 Signed 2022-11-20 2024-02-23 2023-01-15 2023-07-14 ment & upgrade Multimedia onment Reform tions nvelope & Communication facilities K WSSIP PIU PK-KWSB-297897-GO-RFB / CONTRACT PACKAGE G-1: PR Operational & Enabling Envir Open - Internationa Single Stage - One E IBRD / 89940 Prior Request for Bids 10,550,000.00 0.00 Canceled 2022-08-03 2022-10-18 2022-08-08 2022-09-19 2022-10-19 2022-11-23 2023-05-22 OVISION OF BULK FLOW MET onment Reform l nvelope ERS UNDER COMPONENT-2, SOP-I PK-KWSB-368074-GO-RFQ / Procurement and Implement ation of Grievance Redressal Project Management and Stu Request for Quota Single Stage - One E IBRD / 89940 Post Open - National 50,000.00 0.00 Canceled 2023-07-01 2023-08-26 2024-08-25 Mechanism (GRM) Software a dies tions nvelope nd Digitization of Hydrant Inf ormation with One Year Oper ation and Maintenance PK-KWSB-200927-GO-RFB / I Operational & Enabling Envir Single Stage - One E IBRD / 89940 Post Request for Bids Open - National 900,000.00 0.00 Canceled 2021-01-10 2023-10-04 2021-01-15 2021-02-26 2021-03-28 2021-05-02 2022-05-02 mprovement of the GIS onment Reform nvelope PK-KWSB-374464-GO-RFQ / Fleet Management System fo Request for Quota Single Stage - One E IBRD / 89940 Infrastructure Investments Post Limited 95,000.00 0.00 Signed 2023-09-04 2023-09-07 2023-10-30 2023-11-28 2024-10-29 r Suction & Jetting Machines tions nvelope of KW&SC under SOP-I, KWSS IP PK-KWSB-380263-GO-RFQ / Procurement and Implement ation of Grievance Redressal Project Management and Stu Request for Quota Single Stage - One E IBRD / 89940 Post Limited 50,000.00 0.00 Signed 2023-09-11 2023-10-26 2023-11-06 2023-12-13 2024-11-05 Mechanism (GRM) Software a dies tions nvelope nd Digitization of Hydrant Inf ormation with One Year Oper ation and Maintenance PK-KWSB-309252-GO-RFB / Open - Internationa Single Stage - One E Pending Impl IBRD / 89940 Infrastructure Investments Post Request for Bids 1,100,000.00 0.00 2023-02-15 2023-02-20 2023-04-03 2023-05-03 2023-06-07 2024-06-06 Reducing energy consumptio l nvelope ementation n PK-KWSB-389107-GO-RFB / PACKAGE 1: Supply of Consu mer Flow Meters & Bulk Flow Meters with Associated SCAD A Open - Internationa Single Stage - Two E Under Imple IBRD / 89940 Infrastructure Investments Prior Request for Bids 8,891,464.00 0.00 2023-10-26 2023-11-04 2023-10-31 2023-11-15 2023-12-12 2024-02-01 2024-02-24 2024-03-30 2025-03-30 LOT-1: Consumer Flow Meter l nvelope mentation s with Scada Ready Supply, A llied Services (Testing, Com missioning & Training) LOT-2: Bulk Flow Meters with Scada Ready Supply, Allied Services (T PK-KWSB-389171-GO-RFB / I Operational & Enabling Envir Open - Internationa Single Stage - One E IBRD / 89940 Post Request for Bids 900,000.00 0.00 Canceled 2023-10-25 2024-01-04 2023-10-30 2024-01-03 2023-12-11 2024-02-15 2024-01-10 2024-03-27 2024-02-14 2025-02-13 mprovement of GIS onment Reform l nvelope PK-KWSB-389992-GO-RFQ / Project Management and Stu Request for Quota Single Stage - One E Pending Impl IBRD / 89940 Post Limited 100,000.00 0.00 2023-11-05 2023-12-31 2024-06-28 Leakage Detection Equipmen dies tions nvelope ementation t PK-KWSB-390007-GO-RFQ / Project Management and Stu Request for Quota Single Stage - One E Under Imple IBRD / 89940 Post Limited 375,000.00 0.00 2023-11-05 2024-03-14 2023-12-31 2024-06-28 Procurement of Vehicles for P dies tions nvelope mentation IU, KWSSIP PK-KWSB-417607-GO-RFB / Procurement of 10 Pairs of S Single Stage - One E Under Imple IBRD / 89940 Infrastructure Investments Post Request for Bids Open - National 2,300,000.00 0.00 2024-03-25 2024-03-28 2024-03-26 2024-03-25 2024-04-25 2024-04-25 2024-05-25 2024-06-29 2025-04-30 ewage Suction & Jetting Truc nvelope mentation ks and Allied Equipment PK-KWSB-200925-GO-RFB / F or Asset Management Progra Operational & Enabling Envir Single Stage - One E m conduct Gap Analysis, pre IBRD / 89940 Post Request for Bids Open - National 400,000.00 0.00 Canceled 2020-12-20 2020-12-25 2021-02-05 2021-03-07 2021-04-11 2021-10-08 onment Reform nvelope pare Development Strategy & Design Priority Data Collec tion. PK-KWSB-426914-GO-RFB / I Operational & Enabling Envir Single Stage - One E Pending Impl IBRD / 89940 Post Request for Bids Open - National 349,838.00 0.00 2024-05-15 2024-05-16 2024-06-05 2024-06-25 2024-07-26 2025-05-30 mprovement of GIS onment Reform nvelope ementation PK-KWSB-426923-GO-RFB / Operational & Enabling Envir Single Stage - One E Pending Impl Asset Management Program IBRD / 89940 Post Request for Bids Open - National 450,000.00 0.00 2024-05-15 2024-05-16 2024-06-05 2024-06-25 2024-07-26 2025-04-30 onment Reform nvelope ementation & Gap Analysis NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-KWSB-142714-CS-QCBS / Operational & Enabling Envir Quality And Cost- Design, Tender Documents IBRD / 89940 Prior Open - National 3,500,000.00 2,682,670.30 Signed 2020-02-20 2020-07-30 2020-03-12 2020-08-29 2020-04-25 2021-01-04 2020-05-23 2021-03-03 2020-06-22 2021-06-17 2020-07-27 2021-08-30 2020-08-31 2021-10-09 2024-02-29 onment Reform Based Selection and Supervision for SOP-1 PK-KWSB-200842-CS-QCBS / Operational & Enabling Envir Quality And Cost- Rapid Groundwater Protectio IBRD / 89940 Post Open - National 500,000.00 0.00 Canceled 2021-01-25 2021-02-15 2021-03-31 2021-04-28 2021-05-28 2021-07-02 2021-08-06 2022-08-06 onment Reform Based Selection n Assessment PK-KWSB-146130-CS-CQS / T Operational & Enabling Envir Consultant Qualifi IBRD / 89940 Post Open - National 250,000.00 0.00 Canceled 2020-01-10 2020-01-31 2020-03-15 2020-04-14 2020-05-19 2020-11-15 ariff Review onment Reform cation Selection PK-KWSB-201024-CS-QCBS / Operational & Enabling Envir Quality And Cost- Conduct Energy Audit for Wa IBRD / 89940 Post Open - National 500,000.00 0.00 Canceled 2020-12-02 2020-12-07 2020-12-23 2020-12-08 2021-02-05 2022-05-31 2021-03-05 2022-08-05 2021-04-04 2021-05-09 2021-06-13 2022-02-08 onment Reform Based Selection ter / Sewerage Installations Page 3 PK-KWSB-142743-CS-QCBS / Operational & Enabling Envir Quality And Cost- Conduct Energy Audit for Wa IBRD / 89940 Post Open - National 500,000.00 0.00 Canceled 2019-12-26 2019-11-21 2020-01-16 2020-01-03 2020-02-29 2020-03-28 2020-04-18 2020-05-23 2020-06-27 2020-12-26 onment Reform Based Selection ter / Sewerage Installations PK-KWSB-203987-CS-CQS / Operational & Enabling Envir Consultant Qualifi Head Hunting Firm for the hir IBRD / 89940 Post Open - National 30,000.00 0.00 Signed 2021-01-01 2021-10-28 2021-01-22 2021-11-10 2021-03-07 2022-02-07 2021-04-06 2022-03-04 2021-05-11 2022-03-15 2022-05-11 onment Reform cation Selection ing of new KW&SB CEO and Reform Managers. PK-KWSB-200846-CS-QCBS / Operational & Enabling Envir Quality And Cost- Open - Internationa IBRD / 89940 Prior 4,000,000.00 0.00 Signed 2020-12-15 2021-10-18 2021-01-05 2021-11-30 2021-02-18 2022-08-25 2021-03-18 2022-11-14 2021-04-17 2023-09-21 2021-05-22 2024-01-28 2021-06-26 2023-12-25 Updating of KWSB's Masterpl onment Reform Based Selection l an PK-KWSB-142664-CS-QCBS / Design of NRW Program and Operational & Enabling Envir Quality And Cost- Under Implement IBRD / 89940 Post Open - National 1,250,000.00 0.00 2021-03-01 2023-05-05 2021-03-22 2023-05-08 2021-05-05 2023-11-30 2021-06-02 2024-01-29 2021-07-02 2024-04-09 2021-08-06 2021-09-10 2023-03-11 Metering System including P onment Reform Based Selection ation reparation of PB NRW Contra cts. PK-KWSB-142822-CS-CQS / Operational & Enabling Envir Consultant Qualifi Design and Supervision Firm IBRD / 89940 Post Open - National 100,000.00 0.00 Canceled 2021-02-25 2022-06-08 2021-03-18 2022-06-14 2021-05-01 2022-12-09 2021-05-29 2021-06-28 2021-08-02 2021-09-06 2022-09-06 onment Reform cation Selection for Construction of Six Servic e Centers PK-KWSB-142673-CS-QCBS / Priority Sewer Lines Conditio Operational & Enabling Envir Quality And Cost- IBRD / 89940 Post Open - National 200,000.00 0.00 Canceled 2021-04-01 2021-04-22 2021-06-05 2021-07-03 2021-08-02 2021-09-06 2021-10-11 2022-04-11 n Survey and Rehabilitation onment Reform Based Selection Design (incl. Trenchless) PK-KWSB-200850-CS-QCBS / Operational & Enabling Envir Consultant Qualifi Open - Internationa Implementation Support for IBRD / 89940 Post 100,000.00 0.00 Canceled 2021-12-30 2022-01-20 2022-03-05 2022-04-04 2022-05-09 2022-11-05 onment Reform cation Selection l Gender Action Plan PK-KWSB-249688-CS-QCBS / Operational & Enabling Envir Quality And Cost- Open - Internationa IBRD / 89940 Prior 2,250,000.00 0.00 Signed 2021-09-20 2021-10-18 2021-10-11 2021-12-02 2021-11-24 2022-05-24 2021-12-22 2022-07-18 2022-01-21 2023-02-08 2022-02-25 2023-06-11 2022-04-01 2023-09-04 2023-04-01 Institutional Reform Studies onment Reform Based Selection l of KW&SB PK-KWSB-142659-CS-QCBS / Customer Survey &Identificat Operational & Enabling Envir Quality And Cost- ion (Bulk & Retail) IBRD / 89940 Post Open - National 500,000.00 0.00 Canceled 2019-12-31 2020-10-27 2020-01-21 2020-10-27 2020-03-05 2020-04-02 2020-05-02 2020-06-06 2020-07-11 2021-07-11 onment Reform Based Selection Improved Revised Billing & C ollection System PK-KWSB-142562-CS-QCBS / Design of a HR Plan & trainin Operational & Enabling Envir Quality And Cost- gs to KWSB staff/ new KWSB IBRD / 89940 Post Open - National 1,100,000.00 0.00 Canceled 2019-12-24 2020-11-03 2020-01-14 2020-11-07 2020-02-27 2020-03-26 2020-04-25 2020-05-30 2020-07-04 2021-07-04 onment Reform Based Selection Board Software & Hardware of HR s ystem. PK-KWSB-142800-CS-CQS / S Operational & Enabling Envir Consultant Qualifi IBRD / 89940 Post Open - National 100,000.00 0.00 Canceled 2020-12-03 2020-12-10 2020-12-24 2020-12-10 2021-02-06 2021-03-06 2021-04-05 2021-05-10 2021-06-14 2021-12-13 tudy on FM Best Practices onment Reform cation Selection PK-KWSB-146132-CS-CQS / Design and implementation s Operational & Enabling Envir Consultant Qualifi IBRD / 89940 Post Open - National 200,000.00 0.00 Canceled 2021-01-15 2021-02-05 2021-03-21 2021-04-20 2021-05-25 2021-11-21 upport for communication an onment Reform cation Selection d customer relation strategy programs PK-KWSB-309223-CS-QCBS / Strategy for Strengthening of Operational & Enabling Envir Quality And Cost- IBRD / 89940 Post Open - National 400,000.00 0.00 Canceled 2022-08-28 2022-08-30 2022-09-18 2022-09-02 2022-11-01 2022-11-29 2022-12-29 2023-02-02 2023-03-09 2024-03-08 the Katchi Abadis Cell and N onment Reform Based Selection GOs/CBOs working in Katchi Abadis PK-KWSB-309256-CS-QCBS / Operational & Enabling Envir Quality And Cost- Monitoring Industrial Dischar IBRD / 89940 Post Open - National 100,000.00 0.00 Canceled 2022-09-15 2022-10-06 2022-11-19 2022-12-17 2023-01-16 2023-02-20 2023-03-27 2024-03-26 onment Reform Based Selection ge into Sewerage and Storm Water System. PK-KWSB-309292-CS-QCBS / Operational & Enabling Envir Quality And Cost- Design and Implementation o IBRD / 89940 Post Open - National 250,000.00 0.00 Canceled 2023-01-23 2023-02-13 2023-03-29 2023-04-26 2023-05-26 2023-06-30 2023-08-04 2024-08-03 onment Reform Based Selection f a Meter Maintenance Progra m PK-KWSB-309286-CS-QCBS / PPP Options Study for NRW R Operational & Enabling Envir Quality And Cost- Open - Internationa IBRD / 89940 Post 1,000,000.00 0.00 Canceled 2022-12-15 2023-01-05 2023-02-18 2023-03-18 2023-04-17 2023-05-22 2023-06-26 2024-06-25 eduction, Desalination and/or onment Reform Based Selection l Wastewater reuse. PK-KWSB-200832-CS-QCBS / Operational & Enabling Envir Quality And Cost- Open - Internationa IBRD / 89940 Post 1,500,000.00 0.00 Canceled 2020-12-04 2020-12-23 2020-12-25 2020-12-23 2021-02-07 2022-06-27 2021-03-07 2022-08-22 2021-04-06 2022-11-08 2021-05-11 2021-06-15 2023-06-15 Project Management Consult onment Reform Based Selection l ant PK-KWSB-366301-CS-CQS / S trengthening of Katchi Abadi Operational & Enabling Envir Consultant Qualifi IBRD / 89940 Post Open - National 300,000.00 0.00 Signed 2023-06-12 2023-06-21 2023-07-03 2023-07-06 2023-08-16 2023-12-20 2023-09-15 2024-02-15 2023-10-20 2025-06-30 Cell and Engagement of Com onment Reform cation Selection munity Based Organizations ( CBOs) PK-KWSB-368044-CS-CQS / I nvestment Grade Energy Aud Operational & Enabling Envir Consultant Qualifi Under Implement IBRD / 89940 Post Open - National 300,000.00 0.00 2023-06-22 2023-12-12 2023-07-13 2024-01-12 2023-08-26 2023-09-25 2023-10-30 2024-08-30 it for Pumping Stations at Th onment Reform cation Selection ation e Dhabeji Pumping Complex PK-KWSB-368069-CS-CQS / I ndependent Monitoring of En Project Management and Stu Consultant Qualifi Under Implement vironmental and Social Mana IBRD / 89940 Post Open - National 200,000.00 0.00 2023-06-22 2023-08-24 2023-07-13 2023-08-31 2023-08-26 2024-03-15 2023-09-25 2023-10-30 2024-10-29 dies cation Selection ation gement Aspects by an Enviro nmental and Social Consulta ncy Firm PK-KWSB-309281-CS-QCBS / Drafting of Regulations for In direct (Industrial) Discharge i Operational & Enabling Envir Quality And Cost- Under Implement IBRD / 89940 Post Open - National 200,000.00 0.00 2023-07-05 2024-04-04 2023-07-26 2023-09-08 2023-10-06 2023-11-05 2023-12-10 2024-01-14 2025-01-13 nto Sewerage and Monitoring onment Reform Based Selection ation Industrial Discharge into Sew erage and Storm Water Syste m PK-KWSB-422525-CS-CQS / I Operational & Enabling Envir Consultant Qualifi Pending Impleme IBRD / 89940 Post Open - National 84,000.00 0.00 2024-05-06 2024-05-27 2024-07-10 2024-08-09 2024-09-13 2025-03-12 nternal Audit Firm for KWSSI onment Reform cation Selection ntation P INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual PK-KWSB-142755-CS-INDV / Operational & Enabling Envir Individual Consult IBRD / 89940 Post Open 126,000.00 0.00 Terminated 2019-11-05 2019-11-19 2019-12-24 2023-09-27 2020-01-14 2023-09-27 2020-02-18 2020-04-03 2023-02-17 PIU staff for Procurement onment Reform ant Selection Page 4 PK-KWSB-142759-CS-INDV / Operational & Enabling Envir Individual Consult IBRD / 89940 Post Open 126,000.00 0.00 Signed 2019-11-05 2019-11-19 2019-12-24 2023-09-26 2020-01-14 2023-09-25 2020-02-18 2020-09-10 2023-02-17 PIU staff for Financial Manag onment Reform ant Selection ement PK-KWSB-142761-CS-INDV / Operational & Enabling Envir Individual Consult IBRD / 89940 Post Open 126,000.00 0.00 Signed 2019-11-05 2019-11-19 2019-12-24 2023-09-26 2020-01-14 2023-09-26 2020-02-18 2020-06-27 2023-02-17 PIU staff for Communication onment Reform ant Selection PK-KWSB-142798-CS-INDV / Operational & Enabling Envir Individual Consult IBRD / 89940 Post Open 126,000.00 0.00 Signed 2019-11-05 2019-11-19 2019-12-24 2023-09-27 2020-01-14 2023-09-27 2020-02-18 2020-06-02 2023-02-17 PIU staff for Social Developm onment Reform ant Selection ent PK-KWSB-200882-CS-INDV / Operational & Enabling Envir Individual Consult Procurement and Contract M IBRD / 89940 Post Open 126,000.00 0.00 Signed 2020-10-28 2020-11-07 2020-12-16 2023-09-28 2021-01-06 2023-09-28 2021-02-10 2021-11-02 2024-02-10 onment Reform ant Selection anagement Specialist 1 (Addi tional PIU Staff) PK-KWSB-200886-CS-INDV / Operational & Enabling Envir Individual Consult IBRD / 89940 Post Open 126,000.00 0.00 Signed 2020-10-25 2020-11-13 2020-12-13 2023-09-28 2021-01-03 2023-09-28 2021-02-07 2021-01-25 2024-02-07 GIS Specialist (Additional PIU onment Reform ant Selection Staff) PK-KWSB-200894-CS-INDV / Operational & Enabling Envir Individual Consult Under Implement Technical Specialist (Addition IBRD / 89940 Post Open 126,000.00 0.00 2020-10-30 2023-10-24 2020-12-18 2021-01-08 2021-02-12 2021-08-11 onment Reform ant Selection ation al PIU Staff) PK-KWSB-200901-CS-INDV / Operational & Enabling Envir Individual Consult IBRD / 89940 Post Open 126,000.00 0.00 Signed 2020-11-15 2020-11-07 2021-01-03 2023-09-27 2021-01-24 2023-09-27 2021-02-28 2021-04-02 2024-02-28 Gender Specialist (Additional onment Reform ant Selection PIU Staff) PK-KWSB-201033-CS-INDV / Operational & Enabling Envir Individual Consult IBRD / 89940 Post Open 126,000.00 0.00 Canceled 2020-11-05 2020-11-07 2020-12-24 2023-09-27 2021-01-14 2023-09-27 2021-02-18 2024-02-18 PIU staff for Environment onment Reform ant Selection PK-KWSB-201561-CS-INDV / Operational & Enabling Envir Individual Consult Procurement and Contract M IBRD / 89940 Post Open 126,000.00 0.00 Canceled 2020-10-28 2020-11-07 2020-12-16 2021-01-06 2021-02-10 2024-02-10 onment Reform ant Selection anagement Specialist 2 (Addi tional PIU Staff) PK-KWSB-142787-CS-INDV / Operational & Enabling Envir Individual Consult IBRD / 89940 Post Open 126,000.00 0.00 Canceled 2019-11-05 2019-11-19 2019-12-24 2020-01-14 2020-02-18 2023-02-17 PIU staff for Environment onment Reform ant Selection PK-KWSB-335687-CS-INDV / Project Management and Stu Individual Consult Under Implement IBRD / 89940 Post Open - National 126,000.00 0.00 2023-01-11 2023-01-18 2023-03-01 2023-03-22 2023-04-26 2023-10-23 Monitoring & Evaluation Spec dies ant Selection ation ialist PK-KWSB-357391-CS-INDV / Project Management and Stu Individual Consult IBRD / 89940 Post Open - National 84,000.00 0.00 Signed 2023-04-20 2023-05-09 2023-05-26 2023-07-04 2023-06-16 2023-09-25 2023-07-21 2023-08-05 2025-06-30 Financial Specialist (PIU) dies ant Selection PK-KWSB-357613-CS-INDV / Project Management and Stu Individual Consult Under Implement Procurement and Contract M IBRD / 89940 Post Open - National 84,000.00 0.00 2023-04-20 2023-05-09 2023-05-26 2023-06-16 2023-07-21 2025-06-30 dies ant Selection ation anagement Specialist (PIU) PK-KWSB-368848-CS-INDV / Project Management and Stu Individual Consult Under Implement IBRD / 89940 Post Open - National 84,000.00 0.00 2023-07-03 2023-10-04 2023-08-21 2023-09-11 2023-10-16 2025-06-30 Internal Auditor (PIU) dies ant Selection ation PK-KWSB-368849-CS-INDV / Project Management and Stu Individual Consult Under Implement IBRD / 89940 Post Open - National 84,000.00 0.00 2023-07-03 2023-10-04 2023-08-21 2023-09-11 2023-10-16 2024-07-02 Legal Expert for PPP Node-K dies ant Selection ation W&SB PK-KWSB-418185-CS-CDS / P Project Management and Stu Pending Impleme rocurement & Contract Mana IBRD / 89940 Prior Direct Selection Direct - National 40,000.00 0.00 2024-03-26 2024-03-29 2024-04-12 2025-06-30 dies ntation gement Specialist PK-KWSB-418360-CS-CDS / T Project Management and Stu Pending Impleme IBRD / 89940 Post Direct Selection Direct - National 35,000.00 0.00 2024-03-26 2024-03-29 2024-04-12 2025-06-30 echnical & Engineering Speci dies ntation alist PK-KWSB-418359-CS-INDV / Project Management and Stu Individual Consult Pending Impleme IBRD / 89940 Post Limited - National 27,000.00 0.00 2024-03-26 2024-03-31 2024-04-21 2024-05-26 2025-06-30 Social Development Specialis dies ant Selection ntation t PK-KWSB-418363-CS-INDV / Project Management and Stu Individual Consult Pending Impleme IBRD / 89940 Post Limited - National 25,000.00 0.00 2024-03-26 2024-03-31 2024-04-21 2024-05-26 2025-06-30 PIU Staff for Environment dies ant Selection ntation Page 5