Procurement Plan
Project information:
Country: The People's Republic of China
Project name: China Plastic Waste Reduction Project (Shaanxi)
Project number: P176989
Project implementation agency: Urban and Rural Plastic Waste
Reduction Policy Research Center (Joint Meeting Office), Shanxi
Provincial PMO, Baoji Municipal PMO, Jintai District PMO/PIU, Chencang
District PMO/PIU, Weibin District PMO/PIU and Fengxiang District
PMO/PIU; Jingyang County PMO/PIU; Linwei District PMO/PIU,
Chengcheng County PMO/PIU, Pucheng County PMO/PIU and Baishui
County PMO/PIU; Hanzhong Nanzheng District PMO/PIU; Ankang Hanbin
District PMO/PIU.
Date of the procurement plan: April 20, 2024
Period covered by this procurement plan: 2024-2029
Preamble
In accordance with paragraph 5.9 of the “World Bank Procurement
Regulations for IPF Borrowers” dated November 2020 (“Procurement
Regulations”) the Bank’s Systematic Tracking and Exchanges in
Procurement (STEP) system will be used to prepare, clear and update
Procurement Plans and conduct all procurement transactions for the
Project.
This textual part along with the Procurement Plan tables in STEP
constitutes the Procurement Plan for the Project. The following
conditions apply to all procurement activities in the Procurement Plan.
The other elements of the Procurement Plan as required under
paragraph 4.4 of the Procurement Regulations are set forth in STEP.
A. The Bank's Standard Procurement Documents (SPDs). The
Bank's SPDs shall be used for all contracts subject to international
competitive procurement and those contracts as specified in the
Procurement Plan tables in STEP.
B. National procurement arrangements. In accordance with
paragraph 5.3 of Chapter V Procurement Terms of the Procurement
Regulations, when approaching the national market (as specified in the
Procurement Plan tables in STEP), the country's own procurement
procedures (Tendering and Bidding Law of the People's Republic of
China, i.e. TBL promulgated by its Order No. 21 dated August 30, 1999
and the Implementation Regulations of the TBL promulgated by its State
Council Order No. 613 dated November 30, 2011 and its third revision as
per the Decision of the State Council on Amending Some Administrative
Regulations dated March 2, 2019) may be used with the following
conditions to meet the requirements for national open competitive
procurement of paragraph 5.4 of Chapter V Procurement Terms of the
Procurement Regulations.
a. All procurement notices shall be published in a national newspaper of
wide circulation, or on a widely-used website/electronic portal with free
access. At the same time, the website link for publishing procurement
announcements will be published through the World Bank's step system
to attract foreign bidders.
b. A minimum of twenty (20) business days shall be given to Bidders
between the date of such advertisement (or the date of availability of
procurement documents, whichever is later) and the deadline for the
submission of bids. The advertisement and procurement documents
shall specify the deadline for the submission of bids. Potential Bidders
shall be allowed to inspect and purchase procurement documents at any
time prior to the deadline for the submission of bids.
c. Any Bidder/Consultant should be eligible to participate in a
procurement process and to be awarded a Bank-financed contract as
defined in paragraphs 3.21, 3.22 and 3.23 of Chapter III Governance of
the Procurement Regulations.
d. Bidders/Consultants shall be allowed to submit bids/proposals by mail
or in person. Bidders/consultants shall not be mandatory required to be
present at the bid/proposal opening meeting.
e. Bidders should not be required to register as a condition for
inspecting or purchasing procurement documents, submitting its bid or
receiving contract award. A winning Bidder, shall be given reasonable
opportunity of registering (if required) before contract signing without
any influence or hindrance. Bidding shall not be restricted to any class of
contractors.
f. The winning bidder shall not be required, as a condition of award, to
reduce its bid price. No contract negotiation shall be permitted unless
agreed in the procurement plan.
g. No bid may be rejected solely on the basis that the bid price exceeds
any cost estimate. Rejection of all bids or re-bidding shall not be allowed
solely because the number of bids is less than three (3). Rebidding shall
not take place without any sound justification.
h. The Bank's procurement documents for approaching the national
market or any procurement document acceptable to the Bank shall be
used. All procurement documents must require that bidders/consultants
present a signed acceptance at the time of bidding or submitting a
proposal, to be incorporated in any resulting contract, confirming
application of and compliance with the Bank's Anti-Corruption
Guidelines, including without limitation the Bank's right to sanction and
the Bank's inspection and audit rights.
i. The procurement documents shall disclose the newspaper and/or the
electronic means in which the information on contract award shall be
published.
j. The contract award notification shall identify: (a) name and address of
the Borrower's project implementing unit; (b) name and reference
number of the contract being awarded and the selection method used;
(c) names of all Bidders/Consultants that submitted bids/proposals and
their prices as read out at the bid opening meeting and as evaluated; (d)
names of all Bidders/Consultants whose bids/proposals were rejected
either as nonresponsive or as not meeting qualification criteria or were
not evaluated; and (e) the name of the winning Bidder/Consultant, the
final contract price, the contract duration and a summary of its scope.
k. The Borrower shall implement an effective complaint mechanism
allowing bidders or consultants to complain, and have their complaints
handled and responded in a timely manner. Procurement documents
should indicate the complaint mechanism procedure and provide the
professional title and address of the officials to whom such complaints
should be sent.
l. The Bank shall be allowed to review procurement documents and
activities related to the activities included in the procurement plan.
C. Other national procurement arrangements. When other national
procurement arrangements other than national open competitive
procurement arrangements are applied by the Borrower, such
arrangements shall be subject to paragraph 5.5 of Chapter V
Procurement Terms of the Procurement Regulations.
D. Domestic preference as specified under paragraph 5.51 of Chapter
V Procurement Terms of the Procurement Regulations.
Goods: Domestic preference is not applicable for those contracts
identified in the Procurement Plan.
Works: Domestic preference is not applicable for those contracts
identified in the Procurement Plan.
E. Leased assets as specified under paragraph 5.10 of Chapter V
Procurement Terms of the Procurement Regulations. Leasing is not
applicable for those contracts identified in the Procurement Plan tables.
F. Procurement of second-hand goods as specified under paragraph
5.11 of Chapter V Procurement Terms of the Procurement Regulations is
not applicable.
G. Other relevant procurement information.
Prior review threshold. The thresholds for procurement methods for
works, goods and non-consulting services and the requirements for the
Bank's prior review are shown in Table 1.

     Table 1 Thresholds for Procurement Methods and Prior
                                Review
                     Contract
                                                        Prior review
 Expenditure          value          Procurement
                                                         threshold
  category          threshold          method
                                                           (USD)
                      (USD)
                                     International
1. Civil works     ≥40,000,000                           All contracts
                                   open competitive
                    Contract
                                                      Prior review
 Expenditure         value        Procurement
                                                       threshold
  category         threshold        method
                                                         (USD)
                     (USD)
                                    procurement
                                  (international +
                                        open)
                                   National open
                  ≥ 500,000 to       competitive      All contracts
                  < 40,000,000      procurement       ≥15 million
                                 (national + open)
                                     Request for
                   <500,000                                N/A
                                      quotations
                                                      All contracts
                   Any value      Direct selection
                                                      ≥15 million
                                    International
                                 open competitive
                  ≥10,000,000       procurement       All contracts
                                  (international +
                                        open)
2.   Goods/non-                    National open
consulting        ≥ 500,000 to       competitive     All contracts ≥4
services          < 10,000,000      procurement           million
                                 (national + open)
                                     Request for
                   <500,000                                N/A
                                      quotations
                                                   All contracts ≥4
                   Any value      Direct selection
                                                        million
 Currency unit = Chinese Yuan (CNY), USD 1.00 = CNY6.97
 Prior review threshold: The thresholds for procurement methods
 for consulting services and the requirements for the Bank's prior
 review are shown in Table 2.
    Table 2 Thresholds for Procurement Methods and Prior
                            Review
                 Contract
Expendit
                  value               Procurement                 Prior review
   ure
                threshold               method                  threshold (USD)
category
                  (USD)
                 ≥300,000         QCBS/QBS/LCS/FBS            All contracts        ≥2
                 <300,000         FBS LCS CQS                 million

                                  Direct selection of All contracts                ≥1
                                  firms               million
Consultant
 services                         Selection        of     IC All      contracts
                                  consultant                 ≥400,000

                                  Direct selection of All      contracts
                                  ICs                 ≥400,000
Notes:       QCBS: Quality-     and      Cost-Based DS: Direct Selection
             Selection
                                                     IC: IC Consultant selection
             QBS: Quality-Based Selection
                                                     N/A: Not Applicable
             FBS: Fixed Budget Selection
             LCS: Least Cost Selection
             CQS: Consultants'     Qualifications-
             based Selection

 Currency unit = Chinese Yuan (CNY), USD 1.00 = CNY 6.97
 Procurement Packages with Methods and Time Schedule:
        Procurement Schedule of China Plastic Waste Reduction Project (Shaanxi) (Procurement Activities in initial 18 Months of the Project Implementation,
                                                                                                                         First Batch)
                                          Sourc                                                                                                                                             Expecte                         Cont
                              Procure      e of                                                                                        Estimat   Estimat   Selecti               Review      d date      Expect    Contra    ract    Advan
                                                                                                                                                                     Market                                                                   Re
                               ment       funds                                                                                        ed cost   ed cost     on                  by WB         of        ed bid      ct     perio      ce
SN            Contract No.                               Contract name                       Contract description                                                    approa                                                                   mar
                              categor     (Worl                                                                                         (RMB      (USD     Metho                (Prior/Po   publicat     openin    signin     d      contra
                                            d                                                                                                                          ch                                                                     ks
                                 y                                                                                                     '0,000)   '0,000)     d                     st)       ion of      g date    g date   (mon      cting
                                          Bank)                                                                                                                                               SPN                            ths)

                                                       Component 2: Municipal SWM Improvement and
                                                                                                                                       61403      8810                                                                                             
                                                         Agricultural Plastic Waste Management Pilot

                                                                                 Baoji City                                            11691      1677                                                                                             

                                                  Procurement of Civil
                                                                                      The designed capacity is 5.11
                                                  Engineering and Equipment
                                  Civil                                               million m3, and the designed                                                   National                                      2024/1
    1        CPWRP-BJ-CW-01               100%    for the Treatment and Closure                                                        11691      1677         RFB                  Prior       2024/8   2024/9                 18       No        
                                  works                                               capacity       of     daily       domestic                                     + open                                            0
                                                  of Changshougou Domestic
                                                                                      waste treatment is 700t
                                                  Waste Landfill

                                                                          Chencang District                                            12254      1758                                                                                         

                                                                                      (1)           45t/d               stationary
                                                                                      compression                station          in
                                                                                      Dongguan        Street,       with      300 
                                                                                      main         works         and         overall
                                                                                      supporting          works;       (2)    80t/d
                                                                                      stationary compression station
                                                                                      in Qianwei Street, with 300 
                                                                                      main         works         and         overall
                                                  Construction of 2 stationary
                                                                                      supporting                works;           (3)
                                                  compression transfer stations
                                                                                      Construction of 6 lounges for
                                  Civil           in urban area, lounges for                                                                                         National                                      2024/1
    1    CPWRP-BJCC-CW-01                 100%                                        sanitation workers and 100 seat                   1155      166          RFB                  Post        2024/9   2024/10                6        No    
                                  works           sanitation workers and                                                                                             + open                                            1
                                                                                      cleaning staff toolboxes; (4) 4
                                                  renovation of 2 urban
                                                                                      sets    of    horizontal          stationary
                                                  centralized collection sites
                                                                                      compressors;          (5)    Four       17m³
                                                                                      waste containers; (6) 4 sets of
                                                                                      equipment and facilities related
                                                                                      to deodorization, etc.; and (7)
                                                                                      Main works (600  in total) and
                                                                                      overall supporting works for the
                                                                                      renovation           of       2        urban
                                                                                      centralized collection sites
                                                  Construction of parking             11,000        parking maintenance
                                  Civil           maintenance center,                 center,       400           management                                         National                                      2024/1
    2    CPWRP-BJCC-CW-02                 100%                                                                                          688        99          RFB                  Post        2024/9   2024/10                12       No    
                                  works           management rooms and                rooms, 30 charging piles, and 1                                                + open                                            1
                                                  charging piles                      high level water tank
                                   Sourc                                                                                                                                        Expecte                      Cont
                         Procure    e of                                                                                   Estimat   Estimat   Selecti               Review      d date    Expect   Contra    ract   Advan
                                                                                                                                                         Market                                                               Re
                          ment     funds                                                                                   ed cost   ed cost     on                  by WB         of      ed bid     ct     perio     ce
SN     Contract No.                                Contract name                  Contract description                                                   approa                                                               mar
                         categor   (Worl                                                                                    (RMB      (USD     Metho                (Prior/Po   publicat   openin   signin     d     contra
                                     d                                                                                                                     ch                                                                 ks
                            y                                                                                              '0,000)   '0,000)     d                     st)       ion of    g date   g date   (mon     cting
                                   Bank)                                                                                                                                          SPN                         ths)
                                                                            (1) 24t/d mobile compression
                                                                            station in Tuoshi Town, with
                                                                            300m2 of main project and the
                                                                            overall supporting project, two
                                                                            12t mobile waste compression
                                                                            boxes, 1 set of deodorization
                                                                            and       other         facilities       and
                                                                            equipment;        (2)     24t/d      mobile
                                                                            compression              station          in
                                                                            Xiangquan Town, with 300m 2
                                                                            of main project and the overall
                                           Construction of 3 new mobile
                          Civil                                             supporting        project,      two      12t                                 National
3    CPWRP-BJCC-CW-03              100%    compression transfer stations                                                    828       119       RFB                   Post      2025/1     2025/2   2025/3    6       No       
                          works                                             mobile      waste          compression                                       + open
                                           in rural areas
                                                                            boxes, 1 set of deodorization
                                                                            and       other         facilities       and
                                                                            equipment;        (3)     16t/d      mobile
                                                                            compression station in Xinjie
                                                                            Town,     with     300m2        of    main
                                                                            project        and        the        overall
                                                                            supporting        project,      two      12t
                                                                            mobile      waste          compression
                                                                            boxes, 1 set of deodorization
                                                                            and       other         facilities       and
                                                                            equipment
                                                                            (1)     Main      works         (including
                                                                            lounge, 4,500            in total) and
                                                                            overall supporting works for the
                                                                            construction of 15 centralized
     CPWRP-BJCC-CW-04-    Civil            Construction of 15 centralized                                                                                National
4                                  100%                                     collection sites in Chuanyuan                   1200      172       RFB                   Post      2024/6     2024/7   2024/8    9       No       
            1             works            collection sites in Chuanyuan                                                                                 + open
                                                                            Area;     and     (2)     15      sets    of
                                                                            deodorization system and in-
                                                                            station monitoring and flushing
                                                                            equipment
                                                                            (1)     Main      works         (including
                                                                            lounge, 4,500            in total) and
                                                                            overall supporting works for the
                                           Construction of 15 centralized
     CPWRP-BJCC-CW-04-    Civil                                             construction of 15 centralized                                               National
5                                  100%    collection sites in Western                                                      1200      172       RFB                   Post      2024/12    2025/1   2025/2    9       No       
            2             works                                             collection sites in Western Hills                                            + open
                                           Hills
                                                                            Area;     and     (2)     15      sets    of
                                                                            deodorization system and in-
                                                                            station monitoring and flushing
                                   Sourc                                                                                                                                            Expecte                      Cont
                         Procure    e of                                                                                       Estimat   Estimat   Selecti               Review      d date    Expect   Contra    ract   Advan
                                                                                                                                                             Market                                                               Re
                          ment     funds                                                                                       ed cost   ed cost     on                  by WB         of      ed bid     ct     perio     ce
SN     Contract No.                               Contract name                     Contract description                                                     approa                                                               mar
                         categor   (Worl                                                                                        (RMB      (USD     Metho                (Prior/Po   publicat   openin   signin     d     contra
                                     d                                                                                                                         ch                                                                 ks
                            y                                                                                                  '0,000)   '0,000)     d                     st)       ion of    g date   g date   (mon     cting
                                   Bank)                                                                                                                                              SPN                         ths)
                                                                              equipment




                                                                              (1)   Eight     12t      new         energy
                                                                              compression transfer vehicles;
                                                                              (2)   Seven         8t    compression
                                                                              transfer      vehicles;         (3)         5
                                           Waste collection and transfer      collecting          vehicles              (for
                                           facilities and other vehicles in   decoration waste disposal site);                                               National
6    CPWRP-BJCC-G-01-1   Goods     100%                                                                                         3420      491       RFB                   Prior     2024/6     2024/7   2024/8    6       No       
                                           urban and rural centralized        (4) 450 electric waste collecting                                              + open
                                           collection sites                   vehicles; (5) 50 gasoline waste
                                                                              collecting vehicles; (6) 2 sewage
                                                                              suction vehicles; and (7) 14
                                                                              small cleaning and sweeping
                                                                              vehicles;
                                                                              (1) Three 20t new energy hook
                                           Collection and transfer
                                                                              arm transfer vehicles; and (2)                                                 National
7    CPWRP-BJCC-G-01-2   Goods     100%    facilities and other vehicles at                                                     780       112       RFB                   Post      2025/1     2025/2   2025/3    6       No       
                                                                              Three 12t hook arm transfer                                                    + open
                                           the compression station
                                                                              vehicles
                                                                              1. Guozhen Subdistrict Office
                                                                              and Qianwei Subdistrict Office:
                                                                              (1)   9    steel    structure        waste
                                                                              collection sites, including 4 in
                                                                              Qianwei Subdistrict Office and 5
                                                                              in Guozhen Subdistrict Office
                                                                              (20  for each site); (2) 12 steel
                                                                              structure waste collection sites,
                                                                              including       9        in     Qianwei
                                           Equipment procurement for
                                                                              Subdistrict     Office        and     3    in
                                           waste classification publicity
                                                                              Guozhen Subdistrict Office (18                                                 National
8    CPWRP-BJCC-G-02     Goods     100%    and promotion activities in                                                          1227      176       RFB                   Post      2024/6     2024/7   2024/8    6       No       
                                                                              for each site), and 3,000 pieces                                               + open
                                           east area of Chencang
                                                                              of 240L garbage bins in public
                                           District
                                                                              areas; (3) 180 waste sorting
                                                                              booths, including 90 in Guozhen
                                                                              and 90 in Qianwei Subdistrict
                                                                              Office (each is equipped with 3
                                                                              bins of other waste, 1 can of
                                                                              recoverable waste, 1 can of
                                                                              kitchen waste, and 1 can of
                                                                              hazardous          waste        in        the
                                                                              specification       of     240L/can);2.
                              Sourc                                                                                                                     Expecte                      Cont
                    Procure    e of                                                                  Estimat   Estimat   Selecti             Review      d date    Expect   Contra    ract   Advan
                                                                                                                                   Market                                                             Re
                     ment     funds                                                                  ed cost   ed cost     on                by WB         of      ed bid     ct     perio     ce
SN   Contract No.                     Contract name        Contract description                                                    approa                                                             mar
                    categor   (Worl                                                                   (RMB      (USD     Metho              (Prior/Po   publicat   openin   signin     d     contra
                                d                                                                                                    ch                                                               ks
                       y                                                                             '0,000)   '0,000)     d                   st)       ion of    g date   g date   (mon     cting
                              Bank)                                                                                                                       SPN                         ths)
                                                      Yangping Town and Dongguan
                                                      Subdistrict Office: (1) Totally 26
                                                      steel     structure     rural        waste
                                                      collection sites, including 15 in
                                                      Yangping        Town     and        11    in
                                                      Dongguan Subdistrict Office (20
                                                        for each site), and 676 pieces
                                                      of 240L garbage bins in public
                                                      areas;    (2)    1    steel    structure
                                                      district waste collection site in
                                                      Dongguan Subdistrict Office (18
                                                        for each site), and 260 pieces
                                                      of 240L garbage bins in public
                                                      areas;    (3)    76    waste        sorting
                                                      booths,         including       30        in
                                                      Yangping        Town     and        46    in
                                                      Dongguan         Subdistrict         Office
                                                      (each is equipped with 3 bins of
                                                      other      waste,       1      can        of
                                                      recoverable waste, 1 can of
                                                      kitchen waste, and 1 can of
                                                      hazardous         waste        in        the
                                                      specification of 240L/can); (4)
                                                      10,879 pieces of 50L household
                                                      garbage     bins,      one    for     each
                                                      household3.          Zhouyuan        Town
                                                      and Muyi Town: (1) Totally 26
                                                      steel     structure     rural        waste
                                                      collection sites, including 15 in
                                                      Zhouyuan Town and 11 in Muyi
                                                      Town (20  for each site), and
                                                      676 pieces of 240L garbage bins
                                                      in public areas; (2) 52 waste
                                                      sorting booths, including 30 in
                                                      Zhouyuan Town and 22 in Muyi
                                                      Town (each is equipped with 3
                                                      bins of other waste, 1 can of
                                                      recoverable waste, 1 can of
                                                      kitchen waste, and 1 can of
                                                      hazardous         waste        in        the
                                                      specification of 240L/can); (3)
                                 Sourc                                                                                                                                      Expecte                       Cont
                       Procure    e of                                                                                 Estimat   Estimat   Selecti               Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                     Market                                                                Re
                        ment     funds                                                                                 ed cost   ed cost     on                  by WB         of      ed bid      ct     perio     ce
SN    Contract No.                              Contract name                 Contract description                                                   approa                                                                mar
                       categor   (Worl                                                                                  (RMB      (USD     Metho                (Prior/Po   publicat   openin    signin     d     contra
                                   d                                                                                                                   ch                                                                  ks
                          y                                                                                            '0,000)   '0,000)     d                     st)       ion of    g date    g date   (mon     cting
                                 Bank)                                                                                                                                        SPN                          ths)
                                                                          19,663 pieces of 50L household
                                                                          garbage     bins,     one   for      each
                                                                          household4. Jiacun Town: (1)
                                                                          Totally 21 steel structure rural
                                                                          waste collection sites (20  for
                                                                          each site), and 546 pieces of
                                                                          240L garbage bins in public
                                                                          areas;    (2)    42   waste        sorting
                                                                          booths (each is equipped with 3
                                                                          bins of other waste, 1 can of
                                                                          recoverable waste, 1 can of
                                                                          kitchen waste, and 1 can of
                                                                          hazardous         waste       in      the
                                                                          specification of 240L/can); (3)
                                                                          12,545 pieces of 50L household
                                                                          garbage     bins,     one   for      each
                                                                          household




                                                                          1. Xiangong Town and Xinjie
                                                                          Town:     (1)     Totally   29       steel
                                                                          structure rural waste collection
                                                                          sites, including 20 in Xiangong
                                                                          Town and 9 in Xinjie Town (20 
                                                                          for each site), and 754 pieces of
                                                                          240L garbage bins in public
                                                                          areas;    (2)    58   waste        sorting
                                         Equipment procurement for
                                                                          booths,         including     40        in
                                         waste classification publicity
                                                                          Xiangong Town and 18 in Xinjie                                             National                                    2024/1
9    CPWRP-BJCC-G-03   Goods             and promotion activities in                                                    756       108       RFB                   Post      2024/9     2024/11             6       No       
                                                                          Town (each is equipped with 3                                              + open                                        2
                                         west area of Chencang
                                                                          bins of other waste, 1 can of
                                         District
                                                                          recoverable waste, 1 can of
                                                                          kitchen waste, and 1 can of
                                                                          hazardous         waste       in      the
                                                                          specification of 240L/can); (3)
                                                                          13,698 pieces of 50L household
                                                                          garbage     bins,     one   for      each
                                                                          household.
                                                                          2. Chisha Town and Xiangquan
                                 Sourc                                                                                                                                   Expecte                      Cont
                       Procure    e of                                                                              Estimat   Estimat   Selecti               Review      d date    Expect   Contra    ract   Advan
                                                                                                                                                  Market                                                               Re
                        ment     funds                                                                              ed cost   ed cost     on                  by WB         of      ed bid     ct     perio     ce
SN    Contract No.                             Contract name              Contract description                                                    approa                                                               mar
                       categor   (Worl                                                                               (RMB      (USD     Metho                (Prior/Po   publicat   openin   signin     d     contra
                                   d                                                                                                                ch                                                                 ks
                          y                                                                                         '0,000)   '0,000)     d                     st)       ion of    g date   g date   (mon     cting
                                 Bank)                                                                                                                                     SPN                         ths)
                                                                    Town:      (1)   Totally      14        steel
                                                                    structure rural waste collection
                                                                    sites,    including    7     in     Chisha
                                                                    Town and 7 in Xiangquan Town
                                                                    (20  for each site), and 364
                                                                    pieces of 240L garbage bins in
                                                                    public     areas;     (2)    28        waste
                                                                    sorting booths, including 14 in
                                                                    Chisha      Town       and         14      in
                                                                    Xiangquan        Town        (each         is
                                                                    equipped with 3 bins of other
                                                                    waste, 1 can of recoverable
                                                                    waste, 1 can of kitchen waste,
                                                                    and 1 can of hazardous waste in
                                                                    the specification of 240L/can);
                                                                    (3)      6,297      pieces        of     50L
                                                                    household garbage bins, one for
                                                                    each household.
                                                                    3. Pingtou Town, Tuoshi Town
                                                                    and      Fenggeling         Town:         (1)
                                                                    Totally 32 steel structure rural
                                                                    waste collection sites, including
                                                                    14 in Pingtou Town, 12 in Tuoshi
                                                                    Town and 6 in Fenggeling Town
                                                                    (20  for each site), and 810
                                                                    pieces of 240L garbage bins in
                                                                    public     areas;     (2)    64        waste
                                                                    sorting booths, including 28 in
                                                                    Pingtou     Town,     24     in        Tuoshi
                                                                    Town      and    12    in    Fenggeling
                                                                    Town (each is equipped with 3
                                                                    bins of other waste, 1 can of
                                                                    recoverable waste, 1 can of
                                                                    kitchen waste, and 1 can of
                                                                    hazardous        waste        in          the
                                                                    specification of 240L/can); (3)
                                                                    9,918 pieces of 50L household
                                                                    garbage      bins,    one     for       each
                                                                    household.

                                         Dynamic monitoring         Such functions as equipment                                                   National
10   CPWRP-BJCC-G-04   Goods     100%                                                                                1000      143       RFB                   Post      2025/3     2025/4   2025/5    12      No       
                                         information platform for   dispatching and commanding,                                                   + open
                                  Sourc                                                                                                                               Expecte                       Cont
                        Procure    e of                                                                          Estimat   Estimat   Selecti               Review      d date    Expect    Contra    ract   Advan
                                                                                                                                               Market                                                                Re
                         ment     funds                                                                          ed cost   ed cost     on                  by WB         of      ed bid      ct     perio     ce
SN     Contract No.                              Contract name                 Contract description                                            approa                                                                mar
                        categor   (Worl                                                                           (RMB      (USD     Metho                (Prior/Po   publicat   openin    signin     d     contra
                                    d                                                                                                            ch                                                                  ks
                           y                                                                                     '0,000)   '0,000)     d                     st)       ion of    g date    g date   (mon     cting
                                  Bank)                                                                                                                                 SPN                          ths)
                                          urban and rural waste flows     monitoring    of      transportation
                                                                          facilities,        analysis      and
                                                                          prediction, and comprehensive
                                                                          decision-making          shall    be
                                                                          realized

                                                                   Linwei District                               28725      4121                                                                                       

                                                                          (1) Transfer stations in Chelei                                                                                                              
                                                                          Street (200t/d), including
                                                                          demolition works and
                                                                          construction of compression
                                                                          workshop (3,415.76 ); (2)
                                                                          Transfer stations in Shengli
                                          Renovation of 2 compression     Street (100t/d), including
                         Civil                                                                                                                 National
1    CPWRP-LW-CW-01               100%    transfer stations in the main   demolition works and new                4307      618       RFB                   Post      2024/7     2024/8    2024/9    24      No
                         works                                                                                                                 + open
                                          urban area                      construction of compression
                                                                          workshop (423.40 ); (3) 4 sets
                                                                          of horizontal stationary
                                                                          compressors; 7 sets of waste
                                                                          containers; 2 sets of
                                                                          deodorization equipment and
                                                                          other facilities and equipment.
                                                                          (1) Construction of                                                                                                                          
                                                                          Shuangchuang Base transfer
                                                                          station (80t/d), including
                                          Fixed compression transfer      compression workshop (320 );
                         Civil                                                                                                                 National                                    2024/1
2    CPWRP-LW-CW-02-1             100%    stations in Shuangchuang        (2) 2 sets of horizontal                689        99       RFB                   Post      2024/9     2024/10             12      No
                         works                                                                                                                 + open                                        1
                                          Base                            stationary compressors; (3) 2
                                                                          waste containers; and (4) 1 set
                                                                          of deodorization and other
                                                                          facilities.
                                          Construction of 4
                                                                          The construction content and
                         Civil            compression transfer stations                                                                        National
3    CPWRP-LW-CW-02-2             100%                                    scale will be determined after          2229      320       RFB                   Post      2025/1     2025/2    2025/3    6       No
                         works            in towns (Chongning, Gushi,                                                                          + open
                                                                          trial operation.
                                          Jiaoxie and Guandao)
                                                                          Site coverage and anti-seepage                                                                                                               
                                                                          system, with a closure area of
                         Civil            Majiagou sanitary landfill      95,509 ; environmental                                               National                                    2024/1
4    CPWRP-LW-CW-03               100%                                                                            6639      953       RFB                   Post      2024/8     2024/9              18      No
                         works            closure project                 protection measures before site                                      + open                                        0
                                                                          closure, garbage heap
                                                                          treatment in landfills, leachate
                                 Sourc                                                                                                                             Expecte                       Cont
                       Procure    e of                                                                        Estimat   Estimat   Selecti               Review      d date    Expect    Contra    ract   Advan
                                                                                                                                            Market                                                                Re
                        ment     funds                                                                        ed cost   ed cost     on                  by WB         of      ed bid      ct     perio     ce
SN    Contract No.                               Contract name                 Contract description                                         approa                                                                mar
                       categor   (Worl                                                                         (RMB      (USD     Metho                (Prior/Po   publicat   openin    signin     d     contra
                                   d                                                                                                          ch                                                                  ks
                          y                                                                                   '0,000)   '0,000)     d                     st)       ion of    g date    g date   (mon     cting
                                 Bank)                                                                                                                               SPN                          ths)
                                                                          diversion and discharge system,
                                                                          landfill gas exhaust and
                                                                          treatment system, rainwater
                                                                          diversion and discharge system,
                                                                          ecological restoration works,
                                                                          leachate and concentrate
                                                                          treatment and ancillary works.
                                                                          (1) Sorting capacity of 135t/d,
                                                                          including: recyclable sorting
                                                                          workshop (8,500 ) and power
                                         Construction and equipment       distribution and control room
                        Civil                                                                                                               National                                    2025/1
5    CPWRP-LW-CW-04              100%    procurement for Huashan          (300 ); (2) Including plastic        1511      217       RFB                   Post      2025/10    2025/11             12      No        
                        works                                                                                                               + open                                        2
                                         Sorting Center                   sorting facility, metal sorting
                                                                          facility, waste paper sorting
                                                                          facility and other sorting
                                                                          facilities, etc.
                                         Collection and transfer          Procurement of collection and                                                                                                             
                                                                                                                                            Inquiry
                                         vehicles for 2 pilot towns       transfer vehicles for 2 pilot
6    CPWRP-LW-G-01-1   Goods     100%                                                                          336        48       RFQ      procure      Post      2024/6     2024/7    2024/8    3       No
                                         (Xiagui Town and Yangguo         towns: two 31t new energy
                                                                                                                                             ment
                                         Town) (pilot)                    hook arm vehicles.
                                                                          (1) 7 new energy hook arm                                                                                                                 
                                         Vehicles for urban areas         vehicles in urban areas; (2) 13
                                         (Chelei and Shengli Street)      new energy vehicles (3 hook                                       National                                    2024/1
7    CPWRP-LW-G-01-2   Goods     100%                                                                          2630      377       RFB                   Post      2024/9     2024/10             6       No
                                         and Shuangchuang Base            arm vehicles and 10                                               + open                                        1
                                         transfer station                 compression vehicles) in
                                                                          Shuangchuang Base.
                                         Collection and transfer
                                                                          The vehicle type and quantity
                                         vehicles for 4 transfer                                                                            National                                    2024/1
8    CPWRP-LW-G-01-3   Goods     100%                                     will be determined according to      5000      717       RFB                   Post      2024/10    2024/11             6       No
                                         stations in towns (Chongning,                                                                      + open                                        2
                                                                          the operation in the first stage.
                                         Gushi, Jiaoxie and Guandao)
                                         Procurement of publicity and
                                                                          20 sets of computers, projectors
                                         education equipment for                                                                            National                                    2025/1
9    CPWRP-LW-G-02     Goods     100%                                     and VR systems in 20 township        160        23       RFQ                   Post      2025/9     2025/10             6       No        
                                         waste sorting in villages and                                                                      + open                                        1
                                                                          publicity and education centers.
                                         towns
                                         Equipment procurement for
                                                                          Procurement of 160 waste
                                         waste classification publicity
                                                                          collection kiosks, each is                                        National
10   CPWRP-LW-G-03     Goods     100%    and promotion activities in                                           616        88       RFB                   Post      2024/6     2024/7    2024/8    3       No        
                                                                          equipped with seven 240L                                          + open
                                         Duqiao Subdistrict Office and
                                                                          garbage cans
                                         Renmin Subdistrict Office
                                  Sourc                                                                                                                                       Expecte                       Cont
                      Procure      e of                                                                                  Estimat   Estimat   Selecti               Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                       Market                                                                Re
                       ment       funds                                                                                  ed cost   ed cost     on                  by WB         of      ed bid      ct     perio     ce
SN    Contract No.                                 Contract name                   Contract description                                                approa                                                                mar
                      categor     (Worl                                                                                   (RMB      (USD     Metho                (Prior/Po   publicat   openin    signin     d     contra
                                    d                                                                                                                    ch                                                                  ks
                         y                                                                                               '0,000)   '0,000)     d                     st)       ion of    g date    g date   (mon     cting
                                  Bank)                                                                                                                                         SPN                          ths)
                                          Equipment procurement for
                                                                             Procurement of 160 waste
                                          waste classification publicity
                                                                             collection kiosks, each is                                                National                                    2024/1
11   CPWRP-LW-G-04        Goods   100%    and promotion activities in                                                     548        79          RFB                  Post    2024/9     2024/10             3       No           
                                                                             equipped with seven 240L                                                  + open                                        1
                                          Jiefang Subdistrict Office and
                                                                             garbage cans
                                          Xiangyang Subdistrict Office
                                          Equipment procurement for
                                          waste classification publicity     Procurement of 160 waste
                                          and promotion activities in        collection kiosks, each is                                                National
12   CPWRP-LW-G-05        Goods   100%                                                                                    548        79          RFB                  Post    2025/2     2025/3    2025/4    3       No           
                                          Zhannan Subdistrict Office         equipped with seven 240L                                                  + open
                                          and Shuangwang Subdistrict         garbage cans
                                          Office
                                                                             Such functions as equipment
                                                                             dispatching and commanding,
                                          Dynamic monitoring                 monitoring of transportation
                                                                                                                                                       National                                    2025/1
13   CPWRP-LW-G-06        Goods   100%    information platform for           facilities, analysis and                     900       129          RFB                  Post    2025/10    2025/11             6       No           
                                                                                                                                                       + open                                        2
                                          urban and rural waste flows        prediction, and comprehensive
                                                                             decision-making shall be
                                                                             realized
                                                                             Procurement of waste collection
                                          Procurement of waste
                                                                             facilities in 2 pilot towns: 800                                          Inquiry
                                          collection facilities in 2 pilot
14   CPWRP-LW-G-07        Goods   100%                                       metal barrels (240L), 300 metal              170        24          RFQ   procure        Post    2024/6     2024/7    2024/8    3       No           
                                          towns (Xiagui Town and
                                                                             barrels (660L), and 3                                                      ment
                                          Yangguo Town) (pilot)
                                                                             compression boxes.
                                                                             Procurement of 510 village &
                                                                             town-level waste collection
                                          Procurement of facilities for      kiosks (each is equipped with
                                                                                                                                                       National
15   CPWRP-LW-G-08        Goods   100%    village and town level waste       nine 240L garbage cans). The                 2442      350          RFB                  Post    2025/1     2025/2    2025/3    6       No
                                                                                                                                                       + open
                                          collection sites                   quantity and model will be
                                                                             adjusted according to the
                                                                             operation of the pilot village.

                                                                  Chengcheng County                                       8733      1253                                                                                      

                                                                             Two    stations        (30t/d),     each
                                          Construction of mobile             including 470.15  main works
                                          compression transfer stations      (including       transfer     stations,
                          Civil                                                                                                                        National
1    CPWRP-CC-CW-01               100%    in Zhuangtou Town and              lounges,     toilets    and       storage    507        73          RFB                  Post    2024/6     2024/7    2024/8    6       No       
                          works                                                                                                                        + open
                                          Yaotou Town (Urban Area of         rooms),      overall        supporting
                                          Chengcheng County)                 works, as well as equipment
                                                                             and facilities
                                 Sourc                                                                                                                                        Expecte                      Cont
                       Procure    e of                                                                                   Estimat   Estimat   Selecti               Review      d date    Expect   Contra    ract   Advan
                                                                                                                                                       Market                                                               Re
                        ment     funds                                                                                   ed cost   ed cost     on                  by WB         of      ed bid     ct     perio     ce
SN    Contract No.                                  Contract name              Contract description                                                    approa                                                               mar
                       categor   (Worl                                                                                    (RMB      (USD     Metho                (Prior/Po   publicat   openin   signin     d     contra
                                   d                                                                                                                     ch                                                                 ks
                          y                                                                                              '0,000)   '0,000)     d                     st)       ion of    g date   g date   (mon     cting
                                 Bank)                                                                                                                                          SPN                         ths)
                                         Construction of mobile
                                                                         Three stations (30t/d), including
                                         compression transfer stations
                                                                         470.15  main works (including
                                         in Fengyuan Town,
                        Civil                                            transfer         stations,          lounges,                                  National
2    CPWRP-CC-CW-02              100%    Wangzhuang Town and                                                              761       109       RFB                   Post      2025/1     2025/2   2025/3    6       No       
                        works                                            toilets    and        storage        rooms),                                  + open
                                         Zhaozhuang Town (North
                                                                         overall        supporting        works,    as
                                         District of Chengcheng
                                                                         well as equipment and facilities
                                         County)
                                                                         (1)       One        station        (100t/d),
                                                                         including 442.25  main works
                                                                         (including           transfer        station,
                                         Construction of mobile          lounge and operation room),
                                         compression transfer stations   overall        supporting        works,    as
                                         in Chengguan Town, Jiaodao      well as equipment and facilities;
                        Civil                                                                                                                          National
3    CPWRP-CC-CW-03              100%    Town, Siqian Town and           and (2) Three stations (30t/d),                  1465      210       RFB                   Post      2025/1     2025/2   2025/3    6       No       
                        works                                                                                                                          + open
                                         Weizhuang Town (South           each including 470.15                    main
                                         District of Chengcheng          works           (including          transfer
                                         County)                         stations, lounges, toilets and
                                                                         storage              rooms),          overall
                                                                         supporting works, as well as
                                                                         equipment and facilities
                                         Procurement of civil
                                         engineering and equipment
                        Civil                                            The       closure         area      of    the                                 National                                   2024/1
4    CPWRP-CC-CW-04              100%    for closure of Chengcheng                                                        2507      360       RFB                   Post      2024/8     2024/9             18      No       
                        works                                            reservoir area is about 30,000                                                + open                                       0
                                         County domestic waste
                                         landfill
                                         Procurement of civil
                        Civil            engineering and equipment       The       closure         area      of    the                                 National
5    CPWRP-CC-CW-05              100%                                                                                     881       126       RFB                   Post      2025/6     2025/7   2025/8    18      No       
                        works            for closure of Yaotou Town      reservoir area is about 26,000                                                + open
                                         domestic waste landfill
                                                                         (1)   Three          2t    pure      electric
                                                                         automatic            loading        garbage
                                         Collection and transfer
                                                                         trucks;        (2)     Six     2t     barrel-                                 National
6    CPWRP-CC-G-01-1   Goods     100%    vehicles in Zhuangtou Town                                                       177        25       RFQ                   Post      2025/1     2025/2   2025/3    6       No       
                                                                         mounted transfer vehicles; and                                                + open
                                         and Yaotou Town (pilot)
                                                                         (3)       33      electric        collecting
                                                                         vehicles
                                         Collection and transfer         (1) Two 14t box hook arm
                                         vehicles for 7 new mobile       vehicles; (2) Twelve 2t pure
                                         compression transfer stations   electric         automatic           loading                                  National
7    CPWRP-CC-G-01-2   Goods     100%                                                                                     1257      180       RFB                   Post      2025/5     2025/6   2025/7    6       No       
                                         (Fengyuan Town,                 garbage trucks; (3) Twenty-five                                               + open
                                         Wangzhuang Town,                2t    barrel-mounted                transfer
                                         Zhaozhuang Town,                vehicles; (3) Six 10t box hook
                                    Sourc                                                                                                                                           Expecte                       Cont
                         Procure     e of                                                                                     Estimat   Estimat   Selecti                Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                            Market                                                                 Re
                          ment      funds                                                                                     ed cost   ed cost     on                   by WB         of      ed bid      ct     perio     ce
SN       Contract No.                              Contract name                       Contract description                                                 approa                                                                 mar
                         categor    (Worl                                                                                      (RMB      (USD     Metho                 (Prior/Po   publicat   openin    signin     d     contra
                                      d                                                                                                                       ch                                                                   ks
                            y                                                                                                 '0,000)   '0,000)     d                      st)       ion of    g date    g date   (mon     cting
                                    Bank)                                                                                                                                             SPN                          ths)
                                            Chengguan Town, Jiaodao            arm      vehicles;      (4)      One     8t
                                            Town, Siqian Town, and             compression       transfer          vehicle;
                                            Weizhuang Town)                    and (5) 162 electric collecting
                                                                               vehicles


                                                                               (1) Decoration area: 1,500 ; (2)
                                                                               Equipment procurement (5 sets
                                                                               of     LED    display        screens,    10
                                                                               computers, 6 sets of projectors,
                                            Exhibition arrangement and         6 sets of waste sorting VR
                                            equipment procurement for          experience game facilities, 8
                                            the publicity and education        sets     of   garbage         can     touch
                                                                                                                                                            National                                     2024/1
8        CPWRP-CC-G-02   Goods      100%    base, and equipment                experience game facilities, 5                   450        65       RFB                    Post      2024/8     2024/9              6       No       
                                                                                                                                                            + open                                         0
                                            procurement for township           sets     of   waste     sorting       game
                                            waste classification publicity     answering facilities, 30 sets of
                                            and promotion activities           tables and chairs in manual
                                                                               creation area, etc.); (3) 9 sets of
                                                                               computers, projectors and VR
                                                                               systems in 9 township publicity
                                                                               and education centers
                                                                               Such functions as equipment
                                                                               dispatching and commanding,
                                            Dynamic monitoring                 monitoring       of      transportation
                                                                                                                                                            National
9        CPWRP-CC-G-03   Goods      100%    information platform for           facilities,       analysis              and     700       100       RFB                    Post      2025/4     2025/5    2025/6    12      No       
                                                                                                                                                            + open
                                            urban and rural waste flows        prediction, and comprehensive
                                                                               decision-making               shall      be
                                                                               realized
                                            Garbage cans for 9                 780 pieces of 240L garbage                                                   National
10       CPWRP-CC-G-04   Goods      100%                                                                                        28        4        RFQ                    Post      2025/1     2025/2    2025/3    6       No       
                                            compression transfer stations      cans                                                                         + open


                                                                             PPMO                                              8233      1181                                                                                           


                                              Component I: Institutional strengthening and capacity
                                                                                                                               6274      900                                                                                            
                                                                          building
                                                                               (1)     Sub-topic       I:     Study     on
                                                                               classification of rural domestic
                         Consulti           Study on comprehensive             waste; (2) Sub-topic II: Study on                                            Internati
1    CPWRP-PPMO-CS-01      ng       100%    planning of Shaanxi provincial     local standards for urban and                   800       115      QCBS       onal +       Post      2025/9     2025/11   2026/4    18      No           
                         service            urban and rural (waste)            rural         domestic                waste                                   open
                                                                               management; (3) Sub-topic III:
                                                                               Study on rural domestic waste
                                   Sourc                                                                                                                                            Expecte                       Cont
                        Procure     e of                                                                                       Estimat   Estimat   Selecti               Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                             Market                                                                Re
                         ment      funds                                                                                       ed cost   ed cost     on                  by WB         of      ed bid      ct     perio     ce
SN     Contract No.                              Contract name                     Contract description                                                      approa                                                                mar
                        categor    (Worl                                                                                        (RMB      (USD     Metho                (Prior/Po   publicat   openin    signin     d     contra
                                     d                                                                                                                         ch                                                                  ks
                           y                                                                                                   '0,000)   '0,000)     d                     st)       ion of    g date    g date   (mon     cting
                                   Bank)                                                                                                                                              SPN                          ths)
                                                                            treatment mode; (4) Sub-topic
                                                                            IV: Comprehensive planning of
                                                                            urban and rural domestic waste
                                                                            treatment in county; (5) Sub-
                                                                            topic    V:        Study        on     regional
                                                                            sharing       of    urban         and     rural
                                                                            domestic            waste            treatment
                                                                            facilities in Shaanxi province;
                                                                            (6)     Sub-topic         VI:     Study      on
                                                                            overall planning of three types
                                                                            of urban and rural domestic
                                                                            waste      treatment              modes       in
                                                                            Shaanxi Province
                                                                            After the implementation of the
                                                                            project, the Urban and Rural
                                                                            Plastic Waste Reduction Policy
                                                                            Study      Center          will        organize
                                                                            senior    experts          in     sanitation,
                                                                            environmental                     protection,
                                                                            municipal                  administration,
                                                                            agriculture,                    atmospheric
                                                                            environment and performance
                                           Report on the Implementation
                                                                            to     investigate,         discuss        and
                        Consulti           of Urban-Rural Integrated
                                                                            analyze              the                design,                                  National                                    2028/1
2    CPWRP-PPMO-CS-02     ng       100%    Model of Shaanxi                                                                     180        26       CQS                   Post      2028/10    2028/11             12      No        
                                                                            implementation             effect,       model                                   + open                                        2
                        service            Environmental Sanitation
                                                                            innovation          and         adaptability,
                                           System
                                                                            sustainability and other aspects
                                                                            of the urban-rural integrated
                                                                            mode of Shaanxi environmental
                                                                            sanitation system, actively sum
                                                                            up the experience, and form the
                                                                            Report on the Implementation
                                                                            of Urban-Rural Integrated Model
                                                                            of      Shaanxi            Environmental
                                                                            Sanitation System
                                                                            Sort     out       and      compile         the
                                           Experience Case of Plastic
                                                                            Experience          Case          of     Plastic
                        Consulti           Waste Reduction in China and
                                                                            Waste Reduction in China and                                                     National
3    CPWRP-PPMO-CS-03     ng       100%    Compilation of Policies and                                                          180        26       CQS                   Post      2027/7     2027/8    2027/9    24      No        
                                                                            Compilation          of     Policies       and                                   + open
                        service            Information Related to Plastic
                                                                            Information Related to Plastic
                                           Waste Reduction in China
                                                                            Waste Reduction in China for
                                   Sourc                                                                                                                                              Expecte                       Cont
                        Procure     e of                                                                                        Estimat   Estimat   Selecti                Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                              Market                                                                 Re
                         ment      funds                                                                                        ed cost   ed cost     on                   by WB         of      ed bid      ct     perio     ce
SN     Contract No.                              Contract name                    Contract description                                                        approa                                                                 mar
                        categor    (Worl                                                                                         (RMB      (USD     Metho                 (Prior/Po   publicat   openin    signin     d     contra
                                     d                                                                                                                          ch                                                                   ks
                           y                                                                                                    '0,000)   '0,000)     d                      st)       ion of    g date    g date   (mon     cting
                                   Bank)                                                                                                                                                SPN                          ths)
                                                                            reference by all regions




                                                                            The      Project        will    study        the
                                                                            advanced       modes            of        in-situ
                                                                            domestic waste treatment in
                                                                            rural areas in China, make pilot
                                                                            experiments         for        the        source
                                                                            reduction and in-situ treatment
                                                                            of domestic waste in remote
                                                                            areas of Shaanxi combining the
                                                                            actual      situation          of     Shaanxi
                                           Path selection and application   Province, study the adaptability
                        Consulti           of domestic waste source         of such technologies as organic                                                   Internati
4    CPWRP-PPMO-CS-04     ng       100%    reduction and local treatment    waste composting and returning                       500        72      QCBS       onal +       Post      2025/10    2025/12   2026/4    12      No        
                        service            technology in remote rural       to    the       field,          centralized                                        open
                                           areas of Shaanxi Province        composting of kitchen waste,
                                                                            and    nearby           consumption           of
                                                                            slags and dust, sum up relevant
                                                                            experience,         and         form         the
                                                                            Research Report on the Path
                                                                            Selection     and         Application         of
                                                                            Domestic           Waste                  Source
                                                                            Reduction and Local Treatment
                                                                            Technology         in     Remote           Rural
                                                                            Areas of Shaanxi Province
                                                                            For    the     problem               of     "two
                                                                            networks           separation"                of
                                                                            domestic waste in the sanitation
                                                                            system       and        the         renewable
                                                                            resource system in rural areas
                                                                            of    Shaanxi             Province,           an
                                           Study on the integration
                        Consulti                                            effective     connection             between
                                           mode of waste treatment and                                                                                        National
5    CPWRP-PPMO-CS-05     ng       100%                                     the      urban-rural                integrated       150        22       CQS                    Post      2026/3     2026/4    2026/5    12      No        
                                           recycling system in rural                                                                                          + open
                        service                                             sanitation      system              and      the
                                           areas of Shaanxi Province
                                                                            renewable resource system will
                                                                            be established and the "two
                                                                            networks integration" in terms
                                                                            of    mechanism,                    personnel,
                                                                            logistics, facilities and platforms
                                                                            will be actively implemented by
                                   Sourc                                                                                                                                       Expecte                       Cont
                        Procure     e of                                                                                  Estimat   Estimat   Selecti               Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                        Market                                                                Re
                         ment      funds                                                                                  ed cost   ed cost     on                  by WB         of      ed bid      ct     perio     ce
SN     Contract No.                              Contract name                 Contract description                                                     approa                                                                mar
                        categor    (Worl                                                                                   (RMB      (USD     Metho                (Prior/Po   publicat   openin    signin     d     contra
                                     d                                                                                                                    ch                                                                  ks
                           y                                                                                              '0,000)   '0,000)     d                     st)       ion of    g date    g date   (mon     cting
                                   Bank)                                                                                                                                         SPN                          ths)
                                                                          exploring      and        studying        the
                                                                          possibility of implementing the
                                                                          integrated                mode             of
                                                                          environmental                     sanitation
                                                                          recycling,        the       cross-border
                                                                          transformation              mode           of
                                                                          renewable                         resources
                                                                          enterprises,          the         backward
                                                                          extension               mode               of
                                                                          environmental                     sanitation
                                                                          enterprises, the comprehensive
                                                                          intervention          mode         of     the
                                                                          government,           the     distributed
                                                                          processing mode, and the full
                                                                          industry chain mode of each
                                                                          variety in all links of the project.
                                                                          Issue    the      Pilot     Program        of
                                                                          Integration of Two Sanitation
                                                                          Networks       in     Rural       Areas    of
                                                                          Shaanxi Province.
                                                                          Study       the       accounting           of
                                                                          resources, energy consumption
                                                                          and greenhouse gas emissions
                                                                          in the whole process of waste
                                                                          disposal, design and analyze
                                                                          different           waste          disposal
                                                                          scenarios,        and       identify      the
                                                                          control measures for low-carbon
                                                                          development of domestic waste
                                           Carbon emission and
                        Consulti                                          disposal;      find     the       optimized
                                           emission reduction strategy                                                                                  National
6    CPWRP-PPMO-CS-06     ng       100%                                   path of low-carbon development                   150        22       CQS                   Post      2025/11    2025/12   2026/1    12      No        
                                           of rural waste treatment and                                                                                 + open
                        service                                           of garbage treatment modes
                                           disposal in Shaanxi Province
                                                                          combining         the       design        and
                                                                          evaluation of different disposal
                                                                          modes,         and           scientifically
                                                                          evaluate the resource utilization
                                                                          potential and greenhouse gas
                                                                          emissions of urban and rural
                                                                          domestic       waste         in    Shaanxi
                                                                          Province;      and        compare         and
                                                                          analyze the carbon reduction
                                   Sourc                                                                                                                                        Expecte                      Cont
                        Procure     e of                                                                                   Estimat   Estimat   Selecti               Review      d date    Expect   Contra    ract   Advan
                                                                                                                                                         Market                                                               Re
                         ment      funds                                                                                   ed cost   ed cost     on                  by WB         of      ed bid     ct     perio     ce
SN     Contract No.                              Contract name                  Contract description                                                     approa                                                               mar
                        categor    (Worl                                                                                    (RMB      (USD     Metho                (Prior/Po   publicat   openin   signin     d     contra
                                     d                                                                                                                     ch                                                                 ks
                           y                                                                                               '0,000)   '0,000)     d                     st)       ion of    g date   g date   (mon     cting
                                   Bank)                                                                                                                                          SPN                         ths)
                                                                        effect of the project before and
                                                                        after    the     implementation              of
                                                                        Shaanxi urban and rural plastic
                                                                        waste      reduction           project,      to
                                                                        provide                 decision-making
                                                                        reference        for     effective         low-
                                                                        carbon management of urban
                                                                        and rural waste.
                                                                        In order to promote the deep
                                                                        implementation                 of          rural
                                                                        domestic         waste           treatment,
                                                                        further improve the long-term
                                                                        cleaning        mechanism           of     rural
                                                                        environmental sanitation, and
                                                                        improve         rural        environmental
                                                                        sanitation,       the         project       will
                                                                        explore the construction of a
                                                                        target responsibility assessment
                                                                        system for rural domestic waste
                                                                        management on a pilot basis.
                                                                        Combined           with         the        own
                                                                        characteristics of rural domestic
                                                                        waste management, the above
                                           Pilot study on performance
                        Consulti                                        counties        and          districts      will
                                           appraisal system of rural                                                                                     National
7    CPWRP-PPMO-CS-07     ng       100%                                 reasonably             set       the        key     200        29       CQS                   Post      2026/3     2026/4   2026/5    12      No        
                                           domestic waste treatment                                                                                      + open
                        service                                         performance indicators for rural
                                           and management
                                                                        domestic          waste          treatment
                                                                        assessment, establish a sound
                                                                        assessment          and         supervision
                                                                        system, and form the Measures
                                                                        for Assessment and Supervision
                                                                        of      Rural      Domestic              Waste
                                                                        Treatment in ** District/County
                                                                        and put it into trial operation, so
                                                                        as to clarify the responsibilities
                                                                        of departments, improve the
                                                                        daily                           supervision
                                                                        mechanism,mensure                   that    the
                                                                        assessment               results            are
                                                                        objective and impartial, and the
                                                                        operation         is         standardized,
                                   Sourc                                                                                                                                            Expecte                       Cont
                        Procure     e of                                                                                       Estimat   Estimat   Selecti               Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                             Market                                                                Re
                         ment      funds                                                                                       ed cost   ed cost     on                  by WB         of      ed bid      ct     perio     ce
SN     Contract No.                               Contract name                   Contract description                                                       approa                                                                mar
                        categor    (Worl                                                                                        (RMB      (USD     Metho                (Prior/Po   publicat   openin    signin     d     contra
                                     d                                                                                                                         ch                                                                  ks
                           y                                                                                                   '0,000)   '0,000)     d                     st)       ion of    g date    g date   (mon     cting
                                   Bank)                                                                                                                                              SPN                          ths)
                                                                            efficient and smooth.




                                                                            The project will give full play to
                                                                            the overall implementation role
                                                                            of the Environmental Protection
                                                                            Department            of              Shaanxi
                                                                            Provincial     Development                  and
                                                                            Reform Commission in plastic
                                                                            reduction and limitation, and
                                           Study on the construction of
                                                                            study        and          establish           a
                                           coordination mechanism for
                        Consulti                                            cooperative         mechanism                 of
                                           prevention and control of                                                                                         National
8    CPWRP-PPMO-CS-08     ng       100%                                     plastic pollution prevention and                    200        29       CQS                   Post      2026/7     2026/8    2026/9    12      No        
                                           plastic pollution in urban and                                                                                    + open
                        service                                             control in the whole province
                                           rural areas of Shaanxi
                                                                            from the source reduction of
                                           Province
                                                                            plastic waste to the terminal
                                                                            consumption. It will establish a
                                                                            regular joint meeting system,
                                                                            strengthen            communication
                                                                            between relevant departments,
                                                                            and     timely      summarize               and
                                                                            analyze work progress.
                                                                            The     project           will        conduct
                                                                            investigation       and      study,         and
                                                                            establish the method and basis
                                                                            for the government to raise the
                                                                            main    funds       for     rural         waste
                                                                            treatment        through              financial
                        Consulti           Study on cost sharing and        investment, bank financing and
                                                                                                                                                             National                                    2026/1
9    CPWRP-PPMO-CS-09     ng       100%    charge mechanism of rural        bond      financing                  at      the    200        29       CQS                   Post      2026/10    2026/11             12      No        
                                                                                                                                                             + open                                        2
                        service            domestic waste management        government level; and explore
                                                                            the possibility and feasibility of
                                                                            raising funds for rural waste
                                                                            treatment           through                  the
                                                                            establishment         of         a        charge
                                                                            system,       the         operation           of
                                                                            collective       assets          and         the
                                    Sourc                                                                                                                                           Expecte                       Cont
                         Procure     e of                                                                                     Estimat   Estimat   Selecti                Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                            Market                                                                 Re
                          ment      funds                                                                                     ed cost   ed cost     on                   by WB         of      ed bid      ct     perio     ce
SN     Contract No.                                Contract name                   Contract description                                                     approa                                                                 mar
                         categor    (Worl                                                                                      (RMB      (USD     Metho                 (Prior/Po   publicat   openin    signin     d     contra
                                      d                                                                                                                       ch                                                                   ks
                            y                                                                                                 '0,000)   '0,000)     d                      st)       ion of    g date    g date   (mon     cting
                                    Bank)                                                                                                                                             SPN                          ths)
                                                                             collection of funds from some
                                                                             economic organizations within
                                                                             the village collective.



                                                                             The     intelligent          platform     for
                                                                             integrated        management               of
                                                                             urban      and        rural     sanitation
                                                                             establishes           five      intelligent
                                                                             management modules, namely,
                                                                             work      management             platform,
                                                                             source        reduction          platform,
                                                                             delivery and collection platform,
                                                                             transportation         and      treatment
                         Consulti                                                                                                                           Internati
                                            Construction of Shaanxi smart    platform        and      demonstration
10   CPWRP-PPMO-CS-10      ng       100%                                                                                       1000      143      QCBS       onal +       Post      2025/10    2025/12   2026/4    12      No        
                                            sanitation information system    construction platform, and 13
                         service                                                                                                                             open
                                                                             management                   units        for
                                                                             intelligent              management,
                                                                             monitoring and scheduling. By
                                                                             vertically running through the
                                                                             provincial,      municipal,           district
                                                                             (county)        and     town         (village)
                                                                             levels,     a    four-level           linkage
                                                                             command                platform             is
                                                                             established
                                                                             Based      on     investigation          and
                                                                             study, this consultancy will put
                                                                             forward     the       key      tasks     and
                                                                             operation         mechanism                of
                                                                             agricultural film treatment in
                                            Development of
                                                                             Baishui County and Pucheng
                         Consulti           implementation plan of
     CPWRP-PPMO-CS-11-                                                       County,           establish                an                                  National
11                         ng       100%    agricultural film treatment in                                                     200        29       CQS                    Post      2024/5     2024/6    2024/7    12      No        
            1                                                                implementation                 plan        of                                  + open
                         service            Baishui County and Pucheng
                                                                             agricultural          film       pollution
                                            County
                                                                             treatment       according        to     local
                                                                             conditions,       and         develop       a
                                                                             technical              manual              of
                                                                             performance-based                        fund
                                                                             incentive mechanism.
                                    Sourc                                                                                                                                               Expecte                       Cont
                         Procure     e of                                                                                         Estimat   Estimat   Selecti                Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                                Market                                                                 Re
                          ment      funds                                                                                         ed cost   ed cost     on                   by WB         of      ed bid      ct     perio     ce
SN     Contract No.                                Contract name                   Contract description                                                         approa                                                                 mar
                         categor    (Worl                                                                                          (RMB      (USD     Metho                 (Prior/Po   publicat   openin    signin     d     contra
                                      d                                                                                                                           ch                                                                   ks
                            y                                                                                                     '0,000)   '0,000)     d                      st)       ion of    g date    g date   (mon     cting
                                    Bank)                                                                                                                                                 SPN                          ths)
                                                                             Based        on     investigation            and
                                                                             study, this consultancy will put
                                                                             forward       the       key        tasks     and
                                                                             operation            mechanism                 of
                                                                             agricultural film treatment in
                                            Development of
                                                                             Linwei        District,         Chengcheng
                                            implementation plan of
                                                                             County,           Chencang               District,
                         Consulti           agricultural film treatment in                                                                                      Internati
     CPWRP-PPMO-CS-11-                                                       Jingyang          County        and        Hanbin
12                         ng       100%    Linwei District, Chengcheng                                                            700       100      QCBS       onal +       Post      2025/8     2025/10   2026/2    18      No        
            2                                                                District,            establish                 an
                         service            County, Chencang District,                                                                                           open
                                                                             implementation                    plan         of
                                            Jingyang County and Hanbin
                                                                             agricultural             film         pollution
                                            District
                                                                             treatment          according          to     local
                                                                             conditions,          and          develop       a
                                                                             technical                manual                of
                                                                             performance-based                            fund
                                                                             incentive mechanism.
                                                                             (1) Monitoring and evaluation of
                                                                             residual mulch. Set one residual
                                                                             mulch        monitoring            point       for
                                                                             every 10,000 mu of mulch area
                                                                             in    the     project         districts      and
                                                                             counties and one residual mulch
                                                                             monitoring          point          for      every
                                                                             20,000 mu of mulch area in
                                                                             other       districts      and        counties.
                                                                             Monitor and evaluate the usable
                                                                             scope        of     mulch,          applicable
                         Consulti                                            crops,      types        of       use,     laying                                  Internati
                                            Monitoring and evaluation of
13   CPWRP-PPMO-CS-12      ng       100%                                     methods,           recycling        methods,          640        92      QCBS       onal +       Post      2025/3     2025/5    2025/9     /      No        
                                            residual mulch of farmland
                         service                                             mulch residues, etc. in each                                                        open
                                                                             project implementation area in
                                                                             a regular and systematized way,
                                                                             and      establish         a       monitoring
                                                                             database for agricultural film
                                                                             residues           and        a       recycling
                                                                             monitoring system. (2) Select
                                                                             three        districts/counties                for
                                                                             experiment and demonstration.
                                                                             The               experiment                 and
                                                                             demonstration             area        of    each
                                                                             district/county shall be not less
                                   Sourc                                                                                                                                       Expecte                       Cont
                        Procure     e of                                                                                 Estimat   Estimat   Selecti                Review      d date    Expect    Contra    ract   Advan
                                                                                                                                                       Market                                                                 Re
                         ment      funds                                                                                 ed cost   ed cost     on                   by WB         of      ed bid      ct     perio     ce
SN     Contract No.                               Contract name                     Contract description                                               approa                                                                 mar
                        categor    (Worl                                                                                  (RMB      (USD     Metho                 (Prior/Po   publicat   openin    signin     d     contra
                                     d                                                                                                                   ch                                                                   ks
                           y                                                                                             '0,000)   '0,000)     d                      st)       ion of    g date    g date   (mon     cting
                                   Bank)                                                                                                                                         SPN                          ths)
                                                                            than 2,000 mu. For the main
                                                                            mulch covered crops, the use of
                                                                            thickened high-strength mulch
                                                                            of    0.015mm        and     above      is
                                                                            promoted to reduce the use
                                                                            cost of farmers, improve the
                                                                            enthusiasm of farmers to apply
                                                                            thickened high-strength mulch,
                                                                            to ensure the recyclability of
                                                                            mulch from the source.
                                                                            Build      a   data        management
                                                                            information platform for the use
                        Consulti                                            and     recycling     of    agricultural                                   Internati
                                           Ledger information system for                                                                                                                            2024/1
14   CPWRP-PPMO-CS-13     ng       100%                                     films      connected        with       the    1000      143      QCBS       onal +       Post      2024/5     2024/7               /      No        
                                           agricultural film use                                                                                                                                      1
                        service                                             Ministry of Agriculture and Rural                                           open
                                                                            Affairs and covering the whole
                                                                            province.
                                                                            By carrying out a series of
                                                                            capability        evaluation           and
                                                                            improvement           &      promotion
                                                                            activities for various county and
                                                                            district project implementation
                                           Capability evaluation and
                                                                            agencies              (environmental
                                           improvement of county and
                        Consulti                                            sanitation          centers),          the
                                           district project                                                                                            National                                     2024/1
15   CPWRP-PPMO-CS-14     ng       100%                                     management          level    of    urban-     174        25       CQS                    Post      2024/9     2024/10              /      No        
                                           implementation agency                                                                                       + open                                         1
                        service                                             rural sanitation integration by
                                           (environmental sanitation
                                                                            each implementation unit can
                                           center)
                                                                            be improved, and a sound long-
                                                                            term       mechanism          can       be
                                                                            established           to          ensure
                                                                            sustainable       operation       of   the
                                                                            project.

                                              Component III: Project Management, Monitoring and
                                                                                                                          1958      281                                                                                         
                                                                       Evaluation

                                                                            (1)       Guide       and         review
                                                                            engineering design; (2) Guide
                        Consulti                                                                                                                       Internati
                                           Project management               and review the preparation of                                                                                           2024/1
1    CPWRP-PPMO-C1-01     ng       100%                                                                                   836       120      QCBS       onal +       Post      2024/5     2024/7               /      No        
                                           consulting firm                  Bill of Quantities and Technical                                                                                          1
                        service                                                                                                                         open
                                                                            Bids; (3) Go the rounds and
                                                                            supervise                         project
                                    Sourc                                                                                                                                  Expecte                      Cont
                         Procure     e of                                                                             Estimat   Estimat   Selecti               Review      d date    Expect   Contra    ract   Advan
                                                                                                                                                    Market                                                               Re
                          ment      funds                                                                             ed cost   ed cost     on                  by WB         of      ed bid     ct     perio     ce
SN     Contract No.                                Contract name               Contract description                                                 approa                                                               mar
                         categor    (Worl                                                                              (RMB      (USD     Metho                (Prior/Po   publicat   openin   signin     d     contra
                                      d                                                                                                               ch                                                                 ks
                            y                                                                                         '0,000)   '0,000)     d                     st)       ion of    g date   g date   (mon     cting
                                    Bank)                                                                                                                                    SPN                         ths)
                                                                        implementation           progress      and
                                                                        quality, and prepare the semi-
                                                                        annual project progress report
                                                                        (in Chinese and English); (4)
                                                                        Monitor and evaluate project
                                                                        performance            indicators      and
                                                                        prepare the project completion
                                                                        report.
                         Consulti           Development of program      Develop the engineering project
                                                                                                                                                    National
2    CPWRP-PPMO-C1-02      ng       100%    management information      management software suitable                   139        20       CQS                   Post      2024/5     2024/6   2024/7     /      No        
                                                                                                                                                    + open
                         service            system                      for the Project
                                                                        One of the main contents of the
                                                                        project implementation support
                                                                        is        to           monitor         the
                                                                        implementation           of     land   use,
                                                                        resettlement,          relocation      and
                         Consulti                                       other aspects of the Project on
                                            External environmental                                                                                  National
3    CPWRP-PPMO-C1-03      ng       100%                                the spot, and prepare the semi-                202        29       CQS                   Post      2024/5     2024/6   2024/7     /      No        
                                            monitoring agency                                                                                       + open
                         service                                        annual         external         monitoring
                                                                        report to ensure that the impact
                                                                        of      land          requisition      and
                                                                        relocation       on     the     production
                                                                        and living of local residents is
                                                                        minimized
                                                                        Monitor the implementation of
                                                                        land           use,        resettlement,
                         Consulti
                                            External immigration        relocation and other aspects of                                             National
4    CPWRP-PPMO-C1-04      ng       100%                                                                               202        29       CQS                   Post      2024/5     2024/6   2024/7     /      No        
                                            monitoring agency           the Project on the spot, and                                                + open
                         service
                                                                        prepare          the           semi-annual
                                                                        external monitoring report
                                                                        Conduct resident review around
                                            National limited in
                         Consulti                                       the     landfill       site,     purchase
     CPWRP-PPMO-C1-05-                      engineering technology                                                                                  National
5                          ng       100%                                sanitation         vehicles,        review     105        15        IC                   Post      2024/5     2024/6   2024/7     /      No        
            1                               (environmental sanitation                                                                               limited
                         service                                        sanitation                     engineering
                                            engineering technology)
                                                                        technology and scheme, etc.
                                            National limited in
                         Consulti           engineering technology      Review the system construction
     CPWRP-PPMO-C1-05-                                                                                                                              National
6                          ng       100%    (construction of            of sanitation integration in each              105        15        IC                   Post      2024/5     2024/6   2024/7     /      No        
            2                                                                                                                                       limited
                         service            environmental sanitation    county and district
                                            system)
                                    Sourc                                                                                                                                 Expecte                      Cont
                         Procure     e of                                                                            Estimat   Estimat   Selecti               Review      d date    Expect   Contra    ract   Advan
                                                                                                                                                   Market                                                               Re
                          ment      funds                                                                            ed cost   ed cost     on                  by WB         of      ed bid     ct     perio     ce
SN     Contract No.                                Contract name                 Contract description                                              approa                                                               mar
                         categor    (Worl                                                                             (RMB      (USD     Metho                (Prior/Po   publicat   openin   signin     d     contra
                                      d                                                                                                              ch                                                                 ks
                            y                                                                                        '0,000)   '0,000)     d                     st)       ion of    g date   g date   (mon     cting
                                    Bank)                                                                                                                                   SPN                         ths)
                         Consulti
                                            National limited in              Assist   the    Project   Office   in                                 National
7    CPWRP-PPMO-C1-06      ng       100%                                                                              105        15        IC                   Post      2024/5     2024/6   2024/7     /      No        
                                            environmental monitoring         environmental monitoring                                              limited
                         service
                         Consulti
                                            National limited in              Assist   the    Project   Office   in                                 National
8    CPWRP-PPMO-C1-07      ng       100%                                                                              105        15        IC                   Post      2024/5     2024/6   2024/7     /      No        
                                            immigration monitoring           immigration monitoring                                                limited
                         service
                                            Procurement of the first batch   Mainly         purchase       office
                                                                                                                                                   National
9    CPWRP-PPMO-G-01-1   Goods      100%    of county (district) office      equipment such as computers,              70        10       RFQ                   Post      2024/5     2024/6   2024/7     /      No        
                                                                                                                                                   + open
                                            equipment                        printers and projectors
                                            Procurement of the second        Mainly         purchase       office
                                                                                                                                                   National                                   2024/1
10   CPWRP-PPMO-G-01-2   Goods      100%    batch of county (district)       equipment such as computers,              90        13       RFQ                   Post      2024/8     2024/9              /      No        
                                                                                                                                                   + open                                       0
                                            office equipment                 printers and projectors
PROCUREMENT
                China : China Plastic Waste Reduction Project (Shaanxi)
PLAN
General Information
Country:           China                                                                                   2024-05-06
                                                      Bank’s Approval Date of the Original Procurement Plan:
                                                                                                           2024-05-07
                                                      Revised Plan Date(s): (comma delineated, leave blank if none)
Project ID:        P176989                            GPN Date:                                            2024-02-29
Project Name:      China Plastic Waste Reduction Project (Shaanxi)
Loan / Credit No:  IBRD / 94700
                   Foreign Debt Management Office, Shaanxi Provincial DRC
Executing Agency(ies):

WORKS
    Activity Reference No. /                                                                                                                                                                      Estimated Actual Am                                                                                                                                                              Bid Evaluation Report
                                   Loan / Credit N                                                                    Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D                     Process St Draft Pre-qualification Prequalification Evalu              Draft Bidding Docum Specific Procurement    Bidding Documents a Proposal Submission /                                               Contract Complet
           Description                                      Component                Review Type       Method                                                                                     Amount (U ount (US$                                                                                                                                                              and Recommendation        Signed Contract
                                          o.                                                                                 h             cess           (Y/N)             isk     ocument Type                         atus         Documents               ation Report                    ent / Justification Notice / Invitation          s Issued        Opening / Minutes                                                        ion
                                                                                                                                                                                                      S$)       )                                                                                                                                                                        for Award
                                                                                                                                                                                                                                  Planned     Actual      Planned      Actual                Planned      Actual   Planned      Actual    Planned     Actual  Planned     Actual    Planned     Actual     Planned      Actual   Planned

 CPWRP-BJCC-CW-01 / Constr
                                                                                                                                                                                        National Procure
uction of 2 stationary compre                        Component 2: Municipal Soli
                                                                                                                                                                                        ment Document -
ssion transfer stations in urb                       d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-07-2
                               IBRD / 94700                                       Post             Request for Bids   Open - National                                                   1 Envelope proce 1,660,000.00         0.00                                                           2024-10-31            2024-11-07                                 2024-12-19             2025-01-18            2025-02-22
an area, lounges for sanitatio                       vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    7
                                                                                                                                                                                        ss (Non Bank-SPD
n workers and renovation of                          tic Waste Management Pilot
                                                                                                                                                                                        )
2 urban centralized collection
sites.
                                                                                                                                                                                        National Procure
 CPWRP-BJCC-CW-02 / 11,000                           Component 2: Municipal Soli
                                                                                                                                                                                        ment Document -
¡  parking maintenance cente                         d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-06-2
                              IBRD / 94700                                        Post             Request for Bids   Open - National                                                   1 Envelope proce    990,000.00        0.00                                                           2024-09-27            2024-10-04                                 2024-11-15             2024-12-15            2025-01-19
r, 400¡ management rooms,                            vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    3
                                                                                                                                                                                        ss (Non Bank-SPD
30 charging piles, and 1 high                        tic Waste Management Pilot
                                                                                                                                                                                        )
level water tank

 CPWRP-BJCC-CW-04-1 / (1)
Main works (including lounge
                                                                                                                                                                                        National Procure
, 4,500¡ in total) and overall                       Component 2: Municipal Soli
                                                                                                                                                                                        ment Document -
supporting works for the con                         d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-05-2
                                IBRD / 94700                                      Post             Request for Bids   Open - National                                                   1 Envelope proce 1,720,000.00         0.00                                                           2024-08-29            2024-09-05                                 2024-10-17             2024-11-16            2024-12-21
struction of 15 centralized co                       vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    5
                                                                                                                                                                                        ss (Non Bank-SPD
llection sites in Chuanyuan A                        tic Waste Management Pilot
                                                                                                                                                                                        )
rea; and (2) 15 sets of deodo
rization system and in-statio
n monitoring and flushing eq
uipment.
 CPWRP-BJCC-CW-04-2 / (1)
Main works (including lounge
                                                                                                                                                                                        National Procure
, 4,500¡ in total) and overall                       Component 2: Municipal Soli
                                                                                                                                                                                        ment Document -
supporting works for the con                         d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-09-2
                                IBRD / 94700                                      Post             Request for Bids   Open - National                                                   1 Envelope proce 1,720,000.00         0.00                                                           2024-12-27            2025-01-03                                 2025-02-14             2025-03-16            2025-04-20
struction of 15 centralized co                       vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    2
                                                                                                                                                                                        ss (Non Bank-SPD
llection sites in Western Hills                      tic Waste Management Pilot
                                                                                                                                                                                        )
Area; and (2) 15 sets of deod
orization system and in-stati
on monitoring and flushing e
quipment
                                                                                                                                                                                        National Procure
 CPWRP-LW-CW-01 / Renovat                            Component 2: Municipal Soli
                                                                                                                                                                                        ment Document -
ion of 2 compression transfer                        d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-06-2
                                IBRD / 94700                                      Post             Request for Bids   Open - National                                                   1 Envelope proce 6,180,000.00         0.00                                                           2024-09-27            2024-10-04                                 2024-11-15             2024-12-15            2025-01-19
stations in the main urban ar                        vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    3
                                                                                                                                                                                        ss (Non Bank-SPD
ea                                                   tic Waste Management Pilot
                                                                                                                                                                                        )

                                                                                                                                                                                        National Procure
                                                     Component 2: Municipal Soli
 CPWRP-LW-CW-02-1 / Fixed                                                                                                                                                               ment Document -
                                                     d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-08-2
compression transfer station       IBRD / 94700                                   Post             Request for Bids   Open - National                                                   1 Envelope proce    990,000.00        0.00                                                           2024-11-29            2024-12-06                                 2025-01-17             2025-02-16            2025-03-23
                                                     vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    5
s in Shuangchuang Base                                                                                                                                                                  ss (Non Bank-SPD
                                                     tic Waste Management Pilot
                                                                                                                                                                                        )

                                                                                                                                                                                        National Procure
                                                     Component 2: Municipal Soli
 CPWRP-LW-CW-03 / Majiago                                                                                                                                                               ment Document -
                                                     d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-07-2
u sanitary landfill closure proj IBRD / 94700                                     Post             Request for Bids   Open - National                                                   1 Envelope proce 9,530,000.00         0.00                                                           2024-10-25            2024-11-01                                 2024-12-13             2025-01-12            2025-02-16
                                                     vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    1
ect                                                                                                                                                                                     ss (Non Bank-SPD
                                                     tic Waste Management Pilot
                                                                                                                                                                                        )

 CPWRP-CC-CW-01 / Construc                                                                                                                                                              National Procure
                                                     Component 2: Municipal Soli
tion of mobile compression tr                                                                                                                                                           ment Document -
                                                     d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-05-1
ansfer stations in Zhuangtou IBRD / 94700                                         Post             Request for Bids   Open - National                                                   1 Envelope proce    756,716.00        0.00                                                           2024-08-22            2024-08-29                                 2024-10-10             2024-11-09            2024-12-14
                                                     vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    8
Town and Yaotou Town (Urba                                                                                                                                                              ss (Non Bank-SPD
                                                     tic Waste Management Pilot
n Area of Chengcheng Count                                                                                                                                                              )
y)
                                                                                                                                                                                        National Procure
 CPWRP-CC-CW-04 / Procure                            Component 2: Municipal Soli
                                                                                                                                                                                        ment Document -
ment of civil engineering and                        d Waste Management Impro                                                           Single Stage - One E                                                                          Pending Imp                                                                                                                                                                                2026-07-1
                              IBRD / 94700                                        Post             Request for Bids   Open - National                                                   1 Envelope proce 3,741,791.00         0.00                                                           2024-10-23            2024-10-30                                 2024-12-11             2025-01-10            2025-02-14
equipment for closure of Che                         vement and Agricultural Plas                                                       nvelope                                                                                       lementation                                                                                                                                                                                    9
                                                                                                                                                                                        ss (Non Bank-SPD
ngcheng County domestic wa                           tic Waste Management Pilot
                                                                                                                                                                                        )
ste landfill

 CPWRP-BJ-CW-01 / Procurem
ent of Civil Engineering and E
                                                                                                                                                                                        National Procure
quipment for the Treatment                           Component 2: Municipal Soli
                                                                                                                                                                                        ment Document -
and Closure of Baoji Changsh                         d Waste Management Impro                                                           Single Stage - One E                                             16,770,000.0                 Pending Imp                                                                                                                                                                                2026-07-2
                               IBRD / 94700                                       Prior            Request for Bids   Open - National                                                   1 Envelope proce                      0.00                                                           2024-10-24            2024-10-31                                 2024-12-12             2025-01-11            2025-02-15
ougou Domestic Waste Landf                           vement and Agricultural Plas                                                       nvelope                                                                     0                 lementation                                                                                                                                                                                    0
                                                                                                                                                                                        ss (Non Bank-SPD
ill The designed capacity is                         tic Waste Management Pilot
                                                                                                                                                                                        )
5.11 million m3, and the desi
gned capacity of daily domes
tic waste treatment is 700t.



GOODS
    Activity Reference No. /                                                                                                                                                                                                                                                                                                                                 Bid Evaluation Report
                                   Loan / Credit N                                                                    Market Approac Procurement Pro Prequalification Estimated Am Actual Amount           Process St Draft Pre-qualification Prequalification Evalu   Draft Bidding Docum Specific Procurement    Bidding Documents a Proposal Submission /
           Description                                      Component                Review Type       Method                                                                                                                                                                                                                                                and Recommendation        Signed Contract     Contract Completion
                                          o.                                                                                 h             cess           (Y/N)        ount (US$)      (US$)                  atus         Documents              ation Report          ent / Justification Notice / Invitation          s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                   for Award
                                                                                                                                                                                                                          Planned       Actual      Planned   Actual   Planned      Actual   Planned      Actual    Planned     Actual  Planned     Actual    Planned     Actual     Planned      Actual   Planned      Actual
 CPWRP-BJCC-G-01-1 / Waste                           Component 2: Municipal Soli
collection and transfer faciliti                     d Waste Management Impro                                                           Single Stage - One E                                               Pending Impl
                                   IBRD / 94700                                   Prior            Request for Bids   Open - National                                    4,910,000.00              0.00                                                                2024-08-22            2024-08-29                                  2024-10-10           2024-11-09             2024-12-14            2026-05-18
es and other vehicles in urba                        vement and Agricultural Plas                                                       nvelope                                                            ementation
n and rural centralized collec                       tic Waste Management Pilot
tion sites

 CPWRP-BJCC-G-02 / Equipme                           Component 2: Municipal Soli
nt procurement for waste cla                         d Waste Management Impro                                                           Single Stage - One E                                               Pending Impl
                                IBRD / 94700                                      Post             Request for Bids   Open - National                                    1,760,000.00              0.00                                                                2024-08-30            2024-09-06                                  2024-10-18           2024-11-17             2024-12-22            2026-05-26
ssification publicity and prom                       vement and Agricultural Plas                                                       nvelope                                                            ementation
otion activities in east area o                      tic Waste Management Pilot
f Chencang District

 CPWRP-BJCC-G-03 / Equipme                           Component 2: Municipal Soli
nt procurement for waste cla                         d Waste Management Impro                                                           Single Stage - One E                                               Pending Impl
                                IBRD / 94700                                      Post             Request for Bids   Open - National                                    1,080,000.00              0.00                                                                2024-10-25            2024-11-01                                  2024-12-13           2025-01-12             2025-02-16            2025-04-09
ssification publicity and prom                       vement and Agricultural Plas                                                       nvelope                                                            ementation
otion activities in west area o                      tic Waste Management Pilot
f Chencang District

 CPWRP-LW-G-01-1 / Collectio                         Component 2: Municipal Soli
n and transfer vehicles for 2                        d Waste Management Impro                      Request for Quota                    Single Stage - One E                                               Pending Impl
                              IBRD / 94700                                        Post                               Open - National                                       480,000.00              0.00                                                                                      2024-08-02                                                                              2024-10-11            2026-03-15
pilot towns (Xiagui Town and                         vement and Agricultural Plas                  tions                                nvelope                                                            ementation
Yangguo Town) (pilot)                                tic Waste Management Pilot


 CPWRP-LW-G-01-2 / Vehicles                          Component 2: Municipal Soli
for urban areas (Chelei and S                        d Waste Management Impro                                                           Single Stage - One E                                               Pending Impl
                              IBRD / 94700                                        Post             Request for Bids   Open - National                                    3,930,000.00              0.00                                                                2024-11-13            2024-11-20                                  2025-01-01           2025-01-31             2025-03-07            2026-08-09
hengli Street) and Shuangch                          vement and Agricultural Plas                                                       nvelope                                                            ementation
uang Base transfer station                           tic Waste Management Pilot




                                                                                                                                                                                                                             Page 1
 CPWRP-LW-G-03 / Equipmen
                                                 Component 2: Municipal Soli
t procurement for waste clas
                                                 d Waste Management Impro                                                          Single Stage - One E                                                Pending Impl
sification publicity and promo IBRD / 94700                                   Post            Request for Bids   Open - National                                             880,000.00         0.00                                                                 2024-07-25             2024-08-01                                   2024-09-12            2024-10-12             2024-11-16             2026-04-20
                                                 vement and Agricultural Plas                                                      nvelope                                                             ementation
tion activities in Duqiao Subd
                                                 tic Waste Management Pilot
istrict Office and Renmin Sub
district Office

 CPWRP-LW-G-04 / Equipmen
                                                 Component 2: Municipal Soli
t procurement for waste clas
                                                 d Waste Management Impro                                                          Single Stage - One E                                                Pending Impl
sification publicity and promo IBRD / 94700                                   Post            Request for Bids   Open - National                                             790,000.00         0.00                                                                 2024-09-27             2024-10-04                                   2024-11-15            2024-12-15             2025-01-19             2026-06-23
                                                 vement and Agricultural Plas                                                      nvelope                                                             ementation
tion activities in Jiefang Subdi
                                                 tic Waste Management Pilot
strict Office and Xiangyang S
ubdistrict Office

 CPWRP-LW-G-07 / Procurem                        Component 2: Municipal Soli
ent of waste collection faciliti                 d Waste Management Impro                     Request for Quota                    Single Stage - One E                                                Pending Impl
                                 IBRD / 94700                                 Post                              Open - National                                              240,000.00         0.00                                                                                        2024-08-01                                                                                2024-10-26             2026-03-30
es in 2 pilot towns (Xiagui To                   vement and Agricultural Plas                 tions                                nvelope                                                             ementation
wn and Yangguo Town) (pilot                      tic Waste Management Pilot
)

 CPWRP-CC-G-02 / Exhibition
arrangement and equipment                        Component 2: Municipal Soli
procurement for the publicity                    d Waste Management Impro                                                          Single Stage - One E                                                Pending Impl
                               IBRD / 94700                                   Post            Request for Bids   Open - National                                             650,000.00         0.00                                                                 2024-08-30             2024-09-06                                   2024-10-18            2024-11-17             2024-12-22             2026-05-26
and education base, and equi                     vement and Agricultural Plas                                                      nvelope                                                             ementation
pment procurement for town                       tic Waste Management Pilot
ship waste classification publ
icity and promotion activities

 CPWRP-PPMO-G-01-1 / Procu                       Component 3: Project Manag
                                                                                              Request for Quota                    Single Stage - One E                                                Pending Impl
rement of the first batch of c IBRD / 94700      ement, Monitoring and Evalu Post                               Open - National                                                   10.00         0.00                                                                                        2024-07-24                                                                                2024-09-21             2026-02-23
                                                                                              tions                                nvelope                                                             ementation
ounty (district) office equipm                   ation
ent

 CPWRP-PPMO-G-01-2 / Procu                       Component 3: Project Manag
                                                                                              Request for Quota                    Single Stage - One E                                                Pending Impl
rement of the second batch o IBRD / 94700        ement, Monitoring and Evalu Post                               Open - National                                                   13.00         0.00                                                                                        2024-12-27                                                                                2025-03-24             2026-08-26
                                                                                              tions                                nvelope                                                             ementation
f county (district) office equip                 ation
ment



NON CONSULTING SERVICES
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                     Bid Evaluation Report
                               Loan / Credit N                                                                   Market Approac Procurement Pro Prequalification Estimated Am Actual Amount            Process St Draft Pre-qualification Prequalification Evalu     Draft Bidding Docum Specific Procurement      Bidding Documents a Proposal Submission /
       Description                                      Component               Review Type       Method                                                                                                                                                                                                                                                     and Recommendation         Signed Contract      Contract Completion
                                      o.                                                                                h             cess           (Y/N)        ount (US$)      (US$)                   atus         Documents              ation Report            ent / Justification Notice / Invitation            s Issued        Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                   for Award
                                                                                                                                                                                                                      Planned       Actual    Planned      Actual    Planned      Actual    Planned       Actual    Planned     Actual  Planned     Actual    Planned     Actual      Planned       Actual    Planned     Actual




CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                             Combined Evaluation
                               Loan / Credit N                                                                   Market Approac     Contract Type         Estimated Amo Actual Amount                                             Expression of Interest Short List and Draft R Request for Proposals Opening of Technical     Evaluation of Technic
       Description                                      Component               Review Type       Method                                                                              Process Status    Terms of Reference                                                                                                                           Report and Draft Neg    Signed Contract       Contract Completion
                                      o.                                                                                h                                    unt (US$)      (US$)                                                        Notice          equest for Proposals        as Issued         Proposals / Minutes          al Proposal
                                                                                                                                                                                                                                                                                                                                                        otiated Contract
                                                                                                                                                                                                        Planned       Actual       Planned     Actual     Planned     Actual      Planned    Actual      Planned    Actual     Planned      Actual    Planned     Actual    Planned    Actual      Planned    Actual




INDIVIDUAL CONSULTANTS
Activity Reference No. /
                               Loan / Credit N                                                                   Market Approac     Contract Type         Estimated Amo Actual Amount                                             Invitation to Identifie Draft Negotiated Cont
       Description                                      Component               Review Type       Method                                                                              Process Status    Terms of Reference                                                         Signed Contract       Contract Completion
                                      o.                                                                                h                                    unt (US$)      (US$)                                                 d/Selected Consultant            ract
                                                                                                                                                                                                        Planned       Actual       Planned     Actual     Planned     Actual      Planned    Actual      Planned    Actual




                                                                                                                                                                                                                         Page 2