Procurement Plan Project information: Country: The People's Republic of China Project name: China Plastic Waste Reduction Project (Shaanxi) Project number: P176989 Project implementation agency: Urban and Rural Plastic Waste Reduction Policy Research Center (Joint Meeting Office), Shanxi Provincial PMO, Baoji Municipal PMO, Jintai District PMO/PIU, Chencang District PMO/PIU, Weibin District PMO/PIU and Fengxiang District PMO/PIU; Jingyang County PMO/PIU; Linwei District PMO/PIU, Chengcheng County PMO/PIU, Pucheng County PMO/PIU and Baishui County PMO/PIU; Hanzhong Nanzheng District PMO/PIU; Ankang Hanbin District PMO/PIU. Date of the procurement plan: April 20, 2024 Period covered by this procurement plan: 2024-2029 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” dated November 2020 (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitutes the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. A. The Bank's Standard Procurement Documents (SPDs). The Bank's SPDs shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. B. National procurement arrangements. In accordance with paragraph 5.3 of Chapter V Procurement Terms of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country's own procurement procedures (Tendering and Bidding Law of the People's Republic of China, i.e. TBL promulgated by its Order No. 21 dated August 30, 1999 and the Implementation Regulations of the TBL promulgated by its State Council Order No. 613 dated November 30, 2011 and its third revision as per the Decision of the State Council on Amending Some Administrative Regulations dated March 2, 2019) may be used with the following conditions to meet the requirements for national open competitive procurement of paragraph 5.4 of Chapter V Procurement Terms of the Procurement Regulations. a. All procurement notices shall be published in a national newspaper of wide circulation, or on a widely-used website/electronic portal with free access. At the same time, the website link for publishing procurement announcements will be published through the World Bank's step system to attract foreign bidders. b. A minimum of twenty (20) business days shall be given to Bidders between the date of such advertisement (or the date of availability of procurement documents, whichever is later) and the deadline for the submission of bids. The advertisement and procurement documents shall specify the deadline for the submission of bids. Potential Bidders shall be allowed to inspect and purchase procurement documents at any time prior to the deadline for the submission of bids. c. Any Bidder/Consultant should be eligible to participate in a procurement process and to be awarded a Bank-financed contract as defined in paragraphs 3.21, 3.22 and 3.23 of Chapter III Governance of the Procurement Regulations. d. Bidders/Consultants shall be allowed to submit bids/proposals by mail or in person. Bidders/consultants shall not be mandatory required to be present at the bid/proposal opening meeting. e. Bidders should not be required to register as a condition for inspecting or purchasing procurement documents, submitting its bid or receiving contract award. A winning Bidder, shall be given reasonable opportunity of registering (if required) before contract signing without any influence or hindrance. Bidding shall not be restricted to any class of contractors. f. The winning bidder shall not be required, as a condition of award, to reduce its bid price. No contract negotiation shall be permitted unless agreed in the procurement plan. g. No bid may be rejected solely on the basis that the bid price exceeds any cost estimate. Rejection of all bids or re-bidding shall not be allowed solely because the number of bids is less than three (3). Rebidding shall not take place without any sound justification. h. The Bank's procurement documents for approaching the national market or any procurement document acceptable to the Bank shall be used. All procurement documents must require that bidders/consultants present a signed acceptance at the time of bidding or submitting a proposal, to be incorporated in any resulting contract, confirming application of and compliance with the Bank's Anti-Corruption Guidelines, including without limitation the Bank's right to sanction and the Bank's inspection and audit rights. i. The procurement documents shall disclose the newspaper and/or the electronic means in which the information on contract award shall be published. j. The contract award notification shall identify: (a) name and address of the Borrower's project implementing unit; (b) name and reference number of the contract being awarded and the selection method used; (c) names of all Bidders/Consultants that submitted bids/proposals and their prices as read out at the bid opening meeting and as evaluated; (d) names of all Bidders/Consultants whose bids/proposals were rejected either as nonresponsive or as not meeting qualification criteria or were not evaluated; and (e) the name of the winning Bidder/Consultant, the final contract price, the contract duration and a summary of its scope. k. The Borrower shall implement an effective complaint mechanism allowing bidders or consultants to complain, and have their complaints handled and responded in a timely manner. Procurement documents should indicate the complaint mechanism procedure and provide the professional title and address of the officials to whom such complaints should be sent. l. The Bank shall be allowed to review procurement documents and activities related to the activities included in the procurement plan. C. Other national procurement arrangements. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of Chapter V Procurement Terms of the Procurement Regulations. D. Domestic preference as specified under paragraph 5.51 of Chapter V Procurement Terms of the Procurement Regulations. Goods: Domestic preference is not applicable for those contracts identified in the Procurement Plan. Works: Domestic preference is not applicable for those contracts identified in the Procurement Plan. E. Leased assets as specified under paragraph 5.10 of Chapter V Procurement Terms of the Procurement Regulations. Leasing is not applicable for those contracts identified in the Procurement Plan tables. F. Procurement of second-hand goods as specified under paragraph 5.11 of Chapter V Procurement Terms of the Procurement Regulations is not applicable. G. Other relevant procurement information. Prior review threshold. The thresholds for procurement methods for works, goods and non-consulting services and the requirements for the Bank's prior review are shown in Table 1. Table 1 Thresholds for Procurement Methods and Prior Review Contract Prior review Expenditure value Procurement threshold category threshold method (USD) (USD) International 1. Civil works ≥40,000,000 All contracts open competitive Contract Prior review Expenditure value Procurement threshold category threshold method (USD) (USD) procurement (international + open) National open ≥ 500,000 to competitive All contracts < 40,000,000 procurement ≥15 million (national + open) Request for <500,000 N/A quotations All contracts Any value Direct selection ≥15 million International open competitive ≥10,000,000 procurement All contracts (international + open) 2. Goods/non- National open consulting ≥ 500,000 to competitive All contracts ≥4 services < 10,000,000 procurement million (national + open) Request for <500,000 N/A quotations All contracts ≥4 Any value Direct selection million Currency unit = Chinese Yuan (CNY), USD 1.00 = CNY6.97 Prior review threshold: The thresholds for procurement methods for consulting services and the requirements for the Bank's prior review are shown in Table 2. Table 2 Thresholds for Procurement Methods and Prior Review Contract Expendit value Procurement Prior review ure threshold method threshold (USD) category (USD) ≥300,000 QCBS/QBS/LCS/FBS All contracts ≥2 <300,000 FBS LCS CQS million Direct selection of All contracts ≥1 firms million Consultant services Selection of IC All contracts consultant ≥400,000 Direct selection of All contracts ICs ≥400,000 Notes: QCBS: Quality- and Cost-Based DS: Direct Selection Selection IC: IC Consultant selection QBS: Quality-Based Selection N/A: Not Applicable FBS: Fixed Budget Selection LCS: Least Cost Selection CQS: Consultants' Qualifications- based Selection Currency unit = Chinese Yuan (CNY), USD 1.00 = CNY 6.97 Procurement Packages with Methods and Time Schedule: Procurement Schedule of China Plastic Waste Reduction Project (Shaanxi) (Procurement Activities in initial 18 Months of the Project Implementation, First Batch) Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) Component 2: Municipal SWM Improvement and 61403 8810 Agricultural Plastic Waste Management Pilot Baoji City 11691 1677 Procurement of Civil The designed capacity is 5.11 Engineering and Equipment Civil million m3, and the designed National 2024/1 1 CPWRP-BJ-CW-01 100% for the Treatment and Closure 11691 1677 RFB Prior 2024/8 2024/9 18 No works capacity of daily domestic + open 0 of Changshougou Domestic waste treatment is 700t Waste Landfill Chencang District 12254 1758 (1) 45t/d stationary compression station in Dongguan Street, with 300 main works and overall supporting works; (2) 80t/d stationary compression station in Qianwei Street, with 300 main works and overall Construction of 2 stationary supporting works; (3) compression transfer stations Construction of 6 lounges for Civil in urban area, lounges for National 2024/1 1 CPWRP-BJCC-CW-01 100% sanitation workers and 100 seat 1155 166 RFB Post 2024/9 2024/10 6 No works sanitation workers and + open 1 cleaning staff toolboxes; (4) 4 renovation of 2 urban sets of horizontal stationary centralized collection sites compressors; (5) Four 17m³ waste containers; (6) 4 sets of equipment and facilities related to deodorization, etc.; and (7) Main works (600 in total) and overall supporting works for the renovation of 2 urban centralized collection sites Construction of parking 11,000 parking maintenance Civil maintenance center, center, 400 management National 2024/1 2 CPWRP-BJCC-CW-02 100% 688 99 RFB Post 2024/9 2024/10 12 No works management rooms and rooms, 30 charging piles, and 1 + open 1 charging piles high level water tank Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) (1) 24t/d mobile compression station in Tuoshi Town, with 300m2 of main project and the overall supporting project, two 12t mobile waste compression boxes, 1 set of deodorization and other facilities and equipment; (2) 24t/d mobile compression station in Xiangquan Town, with 300m 2 of main project and the overall Construction of 3 new mobile Civil supporting project, two 12t National 3 CPWRP-BJCC-CW-03 100% compression transfer stations 828 119 RFB Post 2025/1 2025/2 2025/3 6 No works mobile waste compression + open in rural areas boxes, 1 set of deodorization and other facilities and equipment; (3) 16t/d mobile compression station in Xinjie Town, with 300m2 of main project and the overall supporting project, two 12t mobile waste compression boxes, 1 set of deodorization and other facilities and equipment (1) Main works (including lounge, 4,500 in total) and overall supporting works for the construction of 15 centralized CPWRP-BJCC-CW-04- Civil Construction of 15 centralized National 4 100% collection sites in Chuanyuan 1200 172 RFB Post 2024/6 2024/7 2024/8 9 No 1 works collection sites in Chuanyuan + open Area; and (2) 15 sets of deodorization system and in- station monitoring and flushing equipment (1) Main works (including lounge, 4,500 in total) and overall supporting works for the Construction of 15 centralized CPWRP-BJCC-CW-04- Civil construction of 15 centralized National 5 100% collection sites in Western 1200 172 RFB Post 2024/12 2025/1 2025/2 9 No 2 works collection sites in Western Hills + open Hills Area; and (2) 15 sets of deodorization system and in- station monitoring and flushing Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) equipment (1) Eight 12t new energy compression transfer vehicles; (2) Seven 8t compression transfer vehicles; (3) 5 Waste collection and transfer collecting vehicles (for facilities and other vehicles in decoration waste disposal site); National 6 CPWRP-BJCC-G-01-1 Goods 100% 3420 491 RFB Prior 2024/6 2024/7 2024/8 6 No urban and rural centralized (4) 450 electric waste collecting + open collection sites vehicles; (5) 50 gasoline waste collecting vehicles; (6) 2 sewage suction vehicles; and (7) 14 small cleaning and sweeping vehicles; (1) Three 20t new energy hook Collection and transfer arm transfer vehicles; and (2) National 7 CPWRP-BJCC-G-01-2 Goods 100% facilities and other vehicles at 780 112 RFB Post 2025/1 2025/2 2025/3 6 No Three 12t hook arm transfer + open the compression station vehicles 1. Guozhen Subdistrict Office and Qianwei Subdistrict Office: (1) 9 steel structure waste collection sites, including 4 in Qianwei Subdistrict Office and 5 in Guozhen Subdistrict Office (20 for each site); (2) 12 steel structure waste collection sites, including 9 in Qianwei Equipment procurement for Subdistrict Office and 3 in waste classification publicity Guozhen Subdistrict Office (18 National 8 CPWRP-BJCC-G-02 Goods 100% and promotion activities in 1227 176 RFB Post 2024/6 2024/7 2024/8 6 No for each site), and 3,000 pieces + open east area of Chencang of 240L garbage bins in public District areas; (3) 180 waste sorting booths, including 90 in Guozhen and 90 in Qianwei Subdistrict Office (each is equipped with 3 bins of other waste, 1 can of recoverable waste, 1 can of kitchen waste, and 1 can of hazardous waste in the specification of 240L/can);2. Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) Yangping Town and Dongguan Subdistrict Office: (1) Totally 26 steel structure rural waste collection sites, including 15 in Yangping Town and 11 in Dongguan Subdistrict Office (20 for each site), and 676 pieces of 240L garbage bins in public areas; (2) 1 steel structure district waste collection site in Dongguan Subdistrict Office (18 for each site), and 260 pieces of 240L garbage bins in public areas; (3) 76 waste sorting booths, including 30 in Yangping Town and 46 in Dongguan Subdistrict Office (each is equipped with 3 bins of other waste, 1 can of recoverable waste, 1 can of kitchen waste, and 1 can of hazardous waste in the specification of 240L/can); (4) 10,879 pieces of 50L household garbage bins, one for each household3. Zhouyuan Town and Muyi Town: (1) Totally 26 steel structure rural waste collection sites, including 15 in Zhouyuan Town and 11 in Muyi Town (20 for each site), and 676 pieces of 240L garbage bins in public areas; (2) 52 waste sorting booths, including 30 in Zhouyuan Town and 22 in Muyi Town (each is equipped with 3 bins of other waste, 1 can of recoverable waste, 1 can of kitchen waste, and 1 can of hazardous waste in the specification of 240L/can); (3) Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) 19,663 pieces of 50L household garbage bins, one for each household4. Jiacun Town: (1) Totally 21 steel structure rural waste collection sites (20 for each site), and 546 pieces of 240L garbage bins in public areas; (2) 42 waste sorting booths (each is equipped with 3 bins of other waste, 1 can of recoverable waste, 1 can of kitchen waste, and 1 can of hazardous waste in the specification of 240L/can); (3) 12,545 pieces of 50L household garbage bins, one for each household 1. Xiangong Town and Xinjie Town: (1) Totally 29 steel structure rural waste collection sites, including 20 in Xiangong Town and 9 in Xinjie Town (20 for each site), and 754 pieces of 240L garbage bins in public areas; (2) 58 waste sorting Equipment procurement for booths, including 40 in waste classification publicity Xiangong Town and 18 in Xinjie National 2024/1 9 CPWRP-BJCC-G-03 Goods and promotion activities in 756 108 RFB Post 2024/9 2024/11 6 No Town (each is equipped with 3 + open 2 west area of Chencang bins of other waste, 1 can of District recoverable waste, 1 can of kitchen waste, and 1 can of hazardous waste in the specification of 240L/can); (3) 13,698 pieces of 50L household garbage bins, one for each household. 2. Chisha Town and Xiangquan Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) Town: (1) Totally 14 steel structure rural waste collection sites, including 7 in Chisha Town and 7 in Xiangquan Town (20 for each site), and 364 pieces of 240L garbage bins in public areas; (2) 28 waste sorting booths, including 14 in Chisha Town and 14 in Xiangquan Town (each is equipped with 3 bins of other waste, 1 can of recoverable waste, 1 can of kitchen waste, and 1 can of hazardous waste in the specification of 240L/can); (3) 6,297 pieces of 50L household garbage bins, one for each household. 3. Pingtou Town, Tuoshi Town and Fenggeling Town: (1) Totally 32 steel structure rural waste collection sites, including 14 in Pingtou Town, 12 in Tuoshi Town and 6 in Fenggeling Town (20 for each site), and 810 pieces of 240L garbage bins in public areas; (2) 64 waste sorting booths, including 28 in Pingtou Town, 24 in Tuoshi Town and 12 in Fenggeling Town (each is equipped with 3 bins of other waste, 1 can of recoverable waste, 1 can of kitchen waste, and 1 can of hazardous waste in the specification of 240L/can); (3) 9,918 pieces of 50L household garbage bins, one for each household. Dynamic monitoring Such functions as equipment National 10 CPWRP-BJCC-G-04 Goods 100% 1000 143 RFB Post 2025/3 2025/4 2025/5 12 No information platform for dispatching and commanding, + open Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) urban and rural waste flows monitoring of transportation facilities, analysis and prediction, and comprehensive decision-making shall be realized Linwei District 28725 4121 (1) Transfer stations in Chelei Street (200t/d), including demolition works and construction of compression workshop (3,415.76 ); (2) Transfer stations in Shengli Renovation of 2 compression Street (100t/d), including Civil National 1 CPWRP-LW-CW-01 100% transfer stations in the main demolition works and new 4307 618 RFB Post 2024/7 2024/8 2024/9 24 No works + open urban area construction of compression workshop (423.40 ); (3) 4 sets of horizontal stationary compressors; 7 sets of waste containers; 2 sets of deodorization equipment and other facilities and equipment. (1) Construction of Shuangchuang Base transfer station (80t/d), including Fixed compression transfer compression workshop (320 ); Civil National 2024/1 2 CPWRP-LW-CW-02-1 100% stations in Shuangchuang (2) 2 sets of horizontal 689 99 RFB Post 2024/9 2024/10 12 No works + open 1 Base stationary compressors; (3) 2 waste containers; and (4) 1 set of deodorization and other facilities. Construction of 4 The construction content and Civil compression transfer stations National 3 CPWRP-LW-CW-02-2 100% scale will be determined after 2229 320 RFB Post 2025/1 2025/2 2025/3 6 No works in towns (Chongning, Gushi, + open trial operation. Jiaoxie and Guandao) Site coverage and anti-seepage system, with a closure area of Civil Majiagou sanitary landfill 95,509 ; environmental National 2024/1 4 CPWRP-LW-CW-03 100% 6639 953 RFB Post 2024/8 2024/9 18 No works closure project protection measures before site + open 0 closure, garbage heap treatment in landfills, leachate Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) diversion and discharge system, landfill gas exhaust and treatment system, rainwater diversion and discharge system, ecological restoration works, leachate and concentrate treatment and ancillary works. (1) Sorting capacity of 135t/d, including: recyclable sorting workshop (8,500 ) and power Construction and equipment distribution and control room Civil National 2025/1 5 CPWRP-LW-CW-04 100% procurement for Huashan (300 ); (2) Including plastic 1511 217 RFB Post 2025/10 2025/11 12 No works + open 2 Sorting Center sorting facility, metal sorting facility, waste paper sorting facility and other sorting facilities, etc. Collection and transfer Procurement of collection and Inquiry vehicles for 2 pilot towns transfer vehicles for 2 pilot 6 CPWRP-LW-G-01-1 Goods 100% 336 48 RFQ procure Post 2024/6 2024/7 2024/8 3 No (Xiagui Town and Yangguo towns: two 31t new energy ment Town) (pilot) hook arm vehicles. (1) 7 new energy hook arm Vehicles for urban areas vehicles in urban areas; (2) 13 (Chelei and Shengli Street) new energy vehicles (3 hook National 2024/1 7 CPWRP-LW-G-01-2 Goods 100% 2630 377 RFB Post 2024/9 2024/10 6 No and Shuangchuang Base arm vehicles and 10 + open 1 transfer station compression vehicles) in Shuangchuang Base. Collection and transfer The vehicle type and quantity vehicles for 4 transfer National 2024/1 8 CPWRP-LW-G-01-3 Goods 100% will be determined according to 5000 717 RFB Post 2024/10 2024/11 6 No stations in towns (Chongning, + open 2 the operation in the first stage. Gushi, Jiaoxie and Guandao) Procurement of publicity and 20 sets of computers, projectors education equipment for National 2025/1 9 CPWRP-LW-G-02 Goods 100% and VR systems in 20 township 160 23 RFQ Post 2025/9 2025/10 6 No waste sorting in villages and + open 1 publicity and education centers. towns Equipment procurement for Procurement of 160 waste waste classification publicity collection kiosks, each is National 10 CPWRP-LW-G-03 Goods 100% and promotion activities in 616 88 RFB Post 2024/6 2024/7 2024/8 3 No equipped with seven 240L + open Duqiao Subdistrict Office and garbage cans Renmin Subdistrict Office Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) Equipment procurement for Procurement of 160 waste waste classification publicity collection kiosks, each is National 2024/1 11 CPWRP-LW-G-04 Goods 100% and promotion activities in 548 79 RFB Post 2024/9 2024/10 3 No equipped with seven 240L + open 1 Jiefang Subdistrict Office and garbage cans Xiangyang Subdistrict Office Equipment procurement for waste classification publicity Procurement of 160 waste and promotion activities in collection kiosks, each is National 12 CPWRP-LW-G-05 Goods 100% 548 79 RFB Post 2025/2 2025/3 2025/4 3 No Zhannan Subdistrict Office equipped with seven 240L + open and Shuangwang Subdistrict garbage cans Office Such functions as equipment dispatching and commanding, Dynamic monitoring monitoring of transportation National 2025/1 13 CPWRP-LW-G-06 Goods 100% information platform for facilities, analysis and 900 129 RFB Post 2025/10 2025/11 6 No + open 2 urban and rural waste flows prediction, and comprehensive decision-making shall be realized Procurement of waste collection Procurement of waste facilities in 2 pilot towns: 800 Inquiry collection facilities in 2 pilot 14 CPWRP-LW-G-07 Goods 100% metal barrels (240L), 300 metal 170 24 RFQ procure Post 2024/6 2024/7 2024/8 3 No towns (Xiagui Town and barrels (660L), and 3 ment Yangguo Town) (pilot) compression boxes. Procurement of 510 village & town-level waste collection Procurement of facilities for kiosks (each is equipped with National 15 CPWRP-LW-G-08 Goods 100% village and town level waste nine 240L garbage cans). The 2442 350 RFB Post 2025/1 2025/2 2025/3 6 No + open collection sites quantity and model will be adjusted according to the operation of the pilot village. Chengcheng County 8733 1253 Two stations (30t/d), each Construction of mobile including 470.15 main works compression transfer stations (including transfer stations, Civil National 1 CPWRP-CC-CW-01 100% in Zhuangtou Town and lounges, toilets and storage 507 73 RFB Post 2024/6 2024/7 2024/8 6 No works + open Yaotou Town (Urban Area of rooms), overall supporting Chengcheng County) works, as well as equipment and facilities Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) Construction of mobile Three stations (30t/d), including compression transfer stations 470.15 main works (including in Fengyuan Town, Civil transfer stations, lounges, National 2 CPWRP-CC-CW-02 100% Wangzhuang Town and 761 109 RFB Post 2025/1 2025/2 2025/3 6 No works toilets and storage rooms), + open Zhaozhuang Town (North overall supporting works, as District of Chengcheng well as equipment and facilities County) (1) One station (100t/d), including 442.25 main works (including transfer station, Construction of mobile lounge and operation room), compression transfer stations overall supporting works, as in Chengguan Town, Jiaodao well as equipment and facilities; Civil National 3 CPWRP-CC-CW-03 100% Town, Siqian Town and and (2) Three stations (30t/d), 1465 210 RFB Post 2025/1 2025/2 2025/3 6 No works + open Weizhuang Town (South each including 470.15 main District of Chengcheng works (including transfer County) stations, lounges, toilets and storage rooms), overall supporting works, as well as equipment and facilities Procurement of civil engineering and equipment Civil The closure area of the National 2024/1 4 CPWRP-CC-CW-04 100% for closure of Chengcheng 2507 360 RFB Post 2024/8 2024/9 18 No works reservoir area is about 30,000 + open 0 County domestic waste landfill Procurement of civil Civil engineering and equipment The closure area of the National 5 CPWRP-CC-CW-05 100% 881 126 RFB Post 2025/6 2025/7 2025/8 18 No works for closure of Yaotou Town reservoir area is about 26,000 + open domestic waste landfill (1) Three 2t pure electric automatic loading garbage Collection and transfer trucks; (2) Six 2t barrel- National 6 CPWRP-CC-G-01-1 Goods 100% vehicles in Zhuangtou Town 177 25 RFQ Post 2025/1 2025/2 2025/3 6 No mounted transfer vehicles; and + open and Yaotou Town (pilot) (3) 33 electric collecting vehicles Collection and transfer (1) Two 14t box hook arm vehicles for 7 new mobile vehicles; (2) Twelve 2t pure compression transfer stations electric automatic loading National 7 CPWRP-CC-G-01-2 Goods 100% 1257 180 RFB Post 2025/5 2025/6 2025/7 6 No (Fengyuan Town, garbage trucks; (3) Twenty-five + open Wangzhuang Town, 2t barrel-mounted transfer Zhaozhuang Town, vehicles; (3) Six 10t box hook Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) Chengguan Town, Jiaodao arm vehicles; (4) One 8t Town, Siqian Town, and compression transfer vehicle; Weizhuang Town) and (5) 162 electric collecting vehicles (1) Decoration area: 1,500 ; (2) Equipment procurement (5 sets of LED display screens, 10 computers, 6 sets of projectors, Exhibition arrangement and 6 sets of waste sorting VR equipment procurement for experience game facilities, 8 the publicity and education sets of garbage can touch National 2024/1 8 CPWRP-CC-G-02 Goods 100% base, and equipment experience game facilities, 5 450 65 RFB Post 2024/8 2024/9 6 No + open 0 procurement for township sets of waste sorting game waste classification publicity answering facilities, 30 sets of and promotion activities tables and chairs in manual creation area, etc.); (3) 9 sets of computers, projectors and VR systems in 9 township publicity and education centers Such functions as equipment dispatching and commanding, Dynamic monitoring monitoring of transportation National 9 CPWRP-CC-G-03 Goods 100% information platform for facilities, analysis and 700 100 RFB Post 2025/4 2025/5 2025/6 12 No + open urban and rural waste flows prediction, and comprehensive decision-making shall be realized Garbage cans for 9 780 pieces of 240L garbage National 10 CPWRP-CC-G-04 Goods 100% 28 4 RFQ Post 2025/1 2025/2 2025/3 6 No compression transfer stations cans + open PPMO 8233 1181 Component I: Institutional strengthening and capacity 6274 900 building (1) Sub-topic I: Study on classification of rural domestic Consulti Study on comprehensive waste; (2) Sub-topic II: Study on Internati 1 CPWRP-PPMO-CS-01 ng 100% planning of Shaanxi provincial local standards for urban and 800 115 QCBS onal + Post 2025/9 2025/11 2026/4 18 No service urban and rural (waste) rural domestic waste open management; (3) Sub-topic III: Study on rural domestic waste Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) treatment mode; (4) Sub-topic IV: Comprehensive planning of urban and rural domestic waste treatment in county; (5) Sub- topic V: Study on regional sharing of urban and rural domestic waste treatment facilities in Shaanxi province; (6) Sub-topic VI: Study on overall planning of three types of urban and rural domestic waste treatment modes in Shaanxi Province After the implementation of the project, the Urban and Rural Plastic Waste Reduction Policy Study Center will organize senior experts in sanitation, environmental protection, municipal administration, agriculture, atmospheric environment and performance Report on the Implementation to investigate, discuss and Consulti of Urban-Rural Integrated analyze the design, National 2028/1 2 CPWRP-PPMO-CS-02 ng 100% Model of Shaanxi 180 26 CQS Post 2028/10 2028/11 12 No implementation effect, model + open 2 service Environmental Sanitation innovation and adaptability, System sustainability and other aspects of the urban-rural integrated mode of Shaanxi environmental sanitation system, actively sum up the experience, and form the Report on the Implementation of Urban-Rural Integrated Model of Shaanxi Environmental Sanitation System Sort out and compile the Experience Case of Plastic Experience Case of Plastic Consulti Waste Reduction in China and Waste Reduction in China and National 3 CPWRP-PPMO-CS-03 ng 100% Compilation of Policies and 180 26 CQS Post 2027/7 2027/8 2027/9 24 No Compilation of Policies and + open service Information Related to Plastic Information Related to Plastic Waste Reduction in China Waste Reduction in China for Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) reference by all regions The Project will study the advanced modes of in-situ domestic waste treatment in rural areas in China, make pilot experiments for the source reduction and in-situ treatment of domestic waste in remote areas of Shaanxi combining the actual situation of Shaanxi Path selection and application Province, study the adaptability Consulti of domestic waste source of such technologies as organic Internati 4 CPWRP-PPMO-CS-04 ng 100% reduction and local treatment waste composting and returning 500 72 QCBS onal + Post 2025/10 2025/12 2026/4 12 No service technology in remote rural to the field, centralized open areas of Shaanxi Province composting of kitchen waste, and nearby consumption of slags and dust, sum up relevant experience, and form the Research Report on the Path Selection and Application of Domestic Waste Source Reduction and Local Treatment Technology in Remote Rural Areas of Shaanxi Province For the problem of "two networks separation" of domestic waste in the sanitation system and the renewable resource system in rural areas of Shaanxi Province, an Study on the integration Consulti effective connection between mode of waste treatment and National 5 CPWRP-PPMO-CS-05 ng 100% the urban-rural integrated 150 22 CQS Post 2026/3 2026/4 2026/5 12 No recycling system in rural + open service sanitation system and the areas of Shaanxi Province renewable resource system will be established and the "two networks integration" in terms of mechanism, personnel, logistics, facilities and platforms will be actively implemented by Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) exploring and studying the possibility of implementing the integrated mode of environmental sanitation recycling, the cross-border transformation mode of renewable resources enterprises, the backward extension mode of environmental sanitation enterprises, the comprehensive intervention mode of the government, the distributed processing mode, and the full industry chain mode of each variety in all links of the project. Issue the Pilot Program of Integration of Two Sanitation Networks in Rural Areas of Shaanxi Province. Study the accounting of resources, energy consumption and greenhouse gas emissions in the whole process of waste disposal, design and analyze different waste disposal scenarios, and identify the control measures for low-carbon development of domestic waste Carbon emission and Consulti disposal; find the optimized emission reduction strategy National 6 CPWRP-PPMO-CS-06 ng 100% path of low-carbon development 150 22 CQS Post 2025/11 2025/12 2026/1 12 No of rural waste treatment and + open service of garbage treatment modes disposal in Shaanxi Province combining the design and evaluation of different disposal modes, and scientifically evaluate the resource utilization potential and greenhouse gas emissions of urban and rural domestic waste in Shaanxi Province; and compare and analyze the carbon reduction Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) effect of the project before and after the implementation of Shaanxi urban and rural plastic waste reduction project, to provide decision-making reference for effective low- carbon management of urban and rural waste. In order to promote the deep implementation of rural domestic waste treatment, further improve the long-term cleaning mechanism of rural environmental sanitation, and improve rural environmental sanitation, the project will explore the construction of a target responsibility assessment system for rural domestic waste management on a pilot basis. Combined with the own characteristics of rural domestic waste management, the above Pilot study on performance Consulti counties and districts will appraisal system of rural National 7 CPWRP-PPMO-CS-07 ng 100% reasonably set the key 200 29 CQS Post 2026/3 2026/4 2026/5 12 No domestic waste treatment + open service performance indicators for rural and management domestic waste treatment assessment, establish a sound assessment and supervision system, and form the Measures for Assessment and Supervision of Rural Domestic Waste Treatment in ** District/County and put it into trial operation, so as to clarify the responsibilities of departments, improve the daily supervision mechanism,mensure that the assessment results are objective and impartial, and the operation is standardized, Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) efficient and smooth. The project will give full play to the overall implementation role of the Environmental Protection Department of Shaanxi Provincial Development and Reform Commission in plastic reduction and limitation, and Study on the construction of study and establish a coordination mechanism for Consulti cooperative mechanism of prevention and control of National 8 CPWRP-PPMO-CS-08 ng 100% plastic pollution prevention and 200 29 CQS Post 2026/7 2026/8 2026/9 12 No plastic pollution in urban and + open service control in the whole province rural areas of Shaanxi from the source reduction of Province plastic waste to the terminal consumption. It will establish a regular joint meeting system, strengthen communication between relevant departments, and timely summarize and analyze work progress. The project will conduct investigation and study, and establish the method and basis for the government to raise the main funds for rural waste treatment through financial Consulti Study on cost sharing and investment, bank financing and National 2026/1 9 CPWRP-PPMO-CS-09 ng 100% charge mechanism of rural bond financing at the 200 29 CQS Post 2026/10 2026/11 12 No + open 2 service domestic waste management government level; and explore the possibility and feasibility of raising funds for rural waste treatment through the establishment of a charge system, the operation of collective assets and the Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) collection of funds from some economic organizations within the village collective. The intelligent platform for integrated management of urban and rural sanitation establishes five intelligent management modules, namely, work management platform, source reduction platform, delivery and collection platform, transportation and treatment Consulti Internati Construction of Shaanxi smart platform and demonstration 10 CPWRP-PPMO-CS-10 ng 100% 1000 143 QCBS onal + Post 2025/10 2025/12 2026/4 12 No sanitation information system construction platform, and 13 service open management units for intelligent management, monitoring and scheduling. By vertically running through the provincial, municipal, district (county) and town (village) levels, a four-level linkage command platform is established Based on investigation and study, this consultancy will put forward the key tasks and operation mechanism of agricultural film treatment in Development of Baishui County and Pucheng Consulti implementation plan of CPWRP-PPMO-CS-11- County, establish an National 11 ng 100% agricultural film treatment in 200 29 CQS Post 2024/5 2024/6 2024/7 12 No 1 implementation plan of + open service Baishui County and Pucheng agricultural film pollution County treatment according to local conditions, and develop a technical manual of performance-based fund incentive mechanism. Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) Based on investigation and study, this consultancy will put forward the key tasks and operation mechanism of agricultural film treatment in Development of Linwei District, Chengcheng implementation plan of County, Chencang District, Consulti agricultural film treatment in Internati CPWRP-PPMO-CS-11- Jingyang County and Hanbin 12 ng 100% Linwei District, Chengcheng 700 100 QCBS onal + Post 2025/8 2025/10 2026/2 18 No 2 District, establish an service County, Chencang District, open implementation plan of Jingyang County and Hanbin agricultural film pollution District treatment according to local conditions, and develop a technical manual of performance-based fund incentive mechanism. (1) Monitoring and evaluation of residual mulch. Set one residual mulch monitoring point for every 10,000 mu of mulch area in the project districts and counties and one residual mulch monitoring point for every 20,000 mu of mulch area in other districts and counties. Monitor and evaluate the usable scope of mulch, applicable Consulti crops, types of use, laying Internati Monitoring and evaluation of 13 CPWRP-PPMO-CS-12 ng 100% methods, recycling methods, 640 92 QCBS onal + Post 2025/3 2025/5 2025/9 / No residual mulch of farmland service mulch residues, etc. in each open project implementation area in a regular and systematized way, and establish a monitoring database for agricultural film residues and a recycling monitoring system. (2) Select three districts/counties for experiment and demonstration. The experiment and demonstration area of each district/county shall be not less Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) than 2,000 mu. For the main mulch covered crops, the use of thickened high-strength mulch of 0.015mm and above is promoted to reduce the use cost of farmers, improve the enthusiasm of farmers to apply thickened high-strength mulch, to ensure the recyclability of mulch from the source. Build a data management information platform for the use Consulti and recycling of agricultural Internati Ledger information system for 2024/1 14 CPWRP-PPMO-CS-13 ng 100% films connected with the 1000 143 QCBS onal + Post 2024/5 2024/7 / No agricultural film use 1 service Ministry of Agriculture and Rural open Affairs and covering the whole province. By carrying out a series of capability evaluation and improvement & promotion activities for various county and district project implementation Capability evaluation and agencies (environmental improvement of county and Consulti sanitation centers), the district project National 2024/1 15 CPWRP-PPMO-CS-14 ng 100% management level of urban- 174 25 CQS Post 2024/9 2024/10 / No implementation agency + open 1 service rural sanitation integration by (environmental sanitation each implementation unit can center) be improved, and a sound long- term mechanism can be established to ensure sustainable operation of the project. Component III: Project Management, Monitoring and 1958 281 Evaluation (1) Guide and review engineering design; (2) Guide Consulti Internati Project management and review the preparation of 2024/1 1 CPWRP-PPMO-C1-01 ng 100% 836 120 QCBS onal + Post 2024/5 2024/7 / No consulting firm Bill of Quantities and Technical 1 service open Bids; (3) Go the rounds and supervise project Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) implementation progress and quality, and prepare the semi- annual project progress report (in Chinese and English); (4) Monitor and evaluate project performance indicators and prepare the project completion report. Consulti Development of program Develop the engineering project National 2 CPWRP-PPMO-C1-02 ng 100% management information management software suitable 139 20 CQS Post 2024/5 2024/6 2024/7 / No + open service system for the Project One of the main contents of the project implementation support is to monitor the implementation of land use, resettlement, relocation and Consulti other aspects of the Project on External environmental National 3 CPWRP-PPMO-C1-03 ng 100% the spot, and prepare the semi- 202 29 CQS Post 2024/5 2024/6 2024/7 / No monitoring agency + open service annual external monitoring report to ensure that the impact of land requisition and relocation on the production and living of local residents is minimized Monitor the implementation of land use, resettlement, Consulti External immigration relocation and other aspects of National 4 CPWRP-PPMO-C1-04 ng 100% 202 29 CQS Post 2024/5 2024/6 2024/7 / No monitoring agency the Project on the spot, and + open service prepare the semi-annual external monitoring report Conduct resident review around National limited in Consulti the landfill site, purchase CPWRP-PPMO-C1-05- engineering technology National 5 ng 100% sanitation vehicles, review 105 15 IC Post 2024/5 2024/6 2024/7 / No 1 (environmental sanitation limited service sanitation engineering engineering technology) technology and scheme, etc. National limited in Consulti engineering technology Review the system construction CPWRP-PPMO-C1-05- National 6 ng 100% (construction of of sanitation integration in each 105 15 IC Post 2024/5 2024/6 2024/7 / No 2 limited service environmental sanitation county and district system) Sourc Expecte Cont Procure e of Estimat Estimat Selecti Review d date Expect Contra ract Advan Market Re ment funds ed cost ed cost on by WB of ed bid ct perio ce SN Contract No. Contract name Contract description approa mar categor (Worl (RMB (USD Metho (Prior/Po publicat openin signin d contra d ch ks y '0,000) '0,000) d st) ion of g date g date (mon cting Bank) SPN ths) Consulti National limited in Assist the Project Office in National 7 CPWRP-PPMO-C1-06 ng 100% 105 15 IC Post 2024/5 2024/6 2024/7 / No environmental monitoring environmental monitoring limited service Consulti National limited in Assist the Project Office in National 8 CPWRP-PPMO-C1-07 ng 100% 105 15 IC Post 2024/5 2024/6 2024/7 / No immigration monitoring immigration monitoring limited service Procurement of the first batch Mainly purchase office National 9 CPWRP-PPMO-G-01-1 Goods 100% of county (district) office equipment such as computers, 70 10 RFQ Post 2024/5 2024/6 2024/7 / No + open equipment printers and projectors Procurement of the second Mainly purchase office National 2024/1 10 CPWRP-PPMO-G-01-2 Goods 100% batch of county (district) equipment such as computers, 90 13 RFQ Post 2024/8 2024/9 / No + open 0 office equipment printers and projectors PROCUREMENT China : China Plastic Waste Reduction Project (Shaanxi) PLAN General Information Country: China 2024-05-06 Bank’s Approval Date of the Original Procurement Plan: 2024-05-07 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P176989 GPN Date: 2024-02-29 Project Name: China Plastic Waste Reduction Project (Shaanxi) Loan / Credit No: IBRD / 94700 Foreign Debt Management Office, Shaanxi Provincial DRC Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned CPWRP-BJCC-CW-01 / Constr National Procure uction of 2 stationary compre Component 2: Municipal Soli ment Document - ssion transfer stations in urb d Waste Management Impro Single Stage - One E Pending Imp 2026-07-2 IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 1,660,000.00 0.00 2024-10-31 2024-11-07 2024-12-19 2025-01-18 2025-02-22 an area, lounges for sanitatio vement and Agricultural Plas nvelope lementation 7 ss (Non Bank-SPD n workers and renovation of tic Waste Management Pilot ) 2 urban centralized collection sites. National Procure CPWRP-BJCC-CW-02 / 11,000 Component 2: Municipal Soli ment Document - ¡ parking maintenance cente d Waste Management Impro Single Stage - One E Pending Imp 2026-06-2 IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 990,000.00 0.00 2024-09-27 2024-10-04 2024-11-15 2024-12-15 2025-01-19 r, 400¡ management rooms, vement and Agricultural Plas nvelope lementation 3 ss (Non Bank-SPD 30 charging piles, and 1 high tic Waste Management Pilot ) level water tank CPWRP-BJCC-CW-04-1 / (1) Main works (including lounge National Procure , 4,500¡ in total) and overall Component 2: Municipal Soli ment Document - supporting works for the con d Waste Management Impro Single Stage - One E Pending Imp 2026-05-2 IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 1,720,000.00 0.00 2024-08-29 2024-09-05 2024-10-17 2024-11-16 2024-12-21 struction of 15 centralized co vement and Agricultural Plas nvelope lementation 5 ss (Non Bank-SPD llection sites in Chuanyuan A tic Waste Management Pilot ) rea; and (2) 15 sets of deodo rization system and in-statio n monitoring and flushing eq uipment. CPWRP-BJCC-CW-04-2 / (1) Main works (including lounge National Procure , 4,500¡ in total) and overall Component 2: Municipal Soli ment Document - supporting works for the con d Waste Management Impro Single Stage - One E Pending Imp 2026-09-2 IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 1,720,000.00 0.00 2024-12-27 2025-01-03 2025-02-14 2025-03-16 2025-04-20 struction of 15 centralized co vement and Agricultural Plas nvelope lementation 2 ss (Non Bank-SPD llection sites in Western Hills tic Waste Management Pilot ) Area; and (2) 15 sets of deod orization system and in-stati on monitoring and flushing e quipment National Procure CPWRP-LW-CW-01 / Renovat Component 2: Municipal Soli ment Document - ion of 2 compression transfer d Waste Management Impro Single Stage - One E Pending Imp 2026-06-2 IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 6,180,000.00 0.00 2024-09-27 2024-10-04 2024-11-15 2024-12-15 2025-01-19 stations in the main urban ar vement and Agricultural Plas nvelope lementation 3 ss (Non Bank-SPD ea tic Waste Management Pilot ) National Procure Component 2: Municipal Soli CPWRP-LW-CW-02-1 / Fixed ment Document - d Waste Management Impro Single Stage - One E Pending Imp 2026-08-2 compression transfer station IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 990,000.00 0.00 2024-11-29 2024-12-06 2025-01-17 2025-02-16 2025-03-23 vement and Agricultural Plas nvelope lementation 5 s in Shuangchuang Base ss (Non Bank-SPD tic Waste Management Pilot ) National Procure Component 2: Municipal Soli CPWRP-LW-CW-03 / Majiago ment Document - d Waste Management Impro Single Stage - One E Pending Imp 2026-07-2 u sanitary landfill closure proj IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 9,530,000.00 0.00 2024-10-25 2024-11-01 2024-12-13 2025-01-12 2025-02-16 vement and Agricultural Plas nvelope lementation 1 ect ss (Non Bank-SPD tic Waste Management Pilot ) CPWRP-CC-CW-01 / Construc National Procure Component 2: Municipal Soli tion of mobile compression tr ment Document - d Waste Management Impro Single Stage - One E Pending Imp 2026-05-1 ansfer stations in Zhuangtou IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 756,716.00 0.00 2024-08-22 2024-08-29 2024-10-10 2024-11-09 2024-12-14 vement and Agricultural Plas nvelope lementation 8 Town and Yaotou Town (Urba ss (Non Bank-SPD tic Waste Management Pilot n Area of Chengcheng Count ) y) National Procure CPWRP-CC-CW-04 / Procure Component 2: Municipal Soli ment Document - ment of civil engineering and d Waste Management Impro Single Stage - One E Pending Imp 2026-07-1 IBRD / 94700 Post Request for Bids Open - National 1 Envelope proce 3,741,791.00 0.00 2024-10-23 2024-10-30 2024-12-11 2025-01-10 2025-02-14 equipment for closure of Che vement and Agricultural Plas nvelope lementation 9 ss (Non Bank-SPD ngcheng County domestic wa tic Waste Management Pilot ) ste landfill CPWRP-BJ-CW-01 / Procurem ent of Civil Engineering and E National Procure quipment for the Treatment Component 2: Municipal Soli ment Document - and Closure of Baoji Changsh d Waste Management Impro Single Stage - One E 16,770,000.0 Pending Imp 2026-07-2 IBRD / 94700 Prior Request for Bids Open - National 1 Envelope proce 0.00 2024-10-24 2024-10-31 2024-12-12 2025-01-11 2025-02-15 ougou Domestic Waste Landf vement and Agricultural Plas nvelope 0 lementation 0 ss (Non Bank-SPD ill The designed capacity is tic Waste Management Pilot ) 5.11 million m3, and the desi gned capacity of daily domes tic waste treatment is 700t. GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CPWRP-BJCC-G-01-1 / Waste Component 2: Municipal Soli collection and transfer faciliti d Waste Management Impro Single Stage - One E Pending Impl IBRD / 94700 Prior Request for Bids Open - National 4,910,000.00 0.00 2024-08-22 2024-08-29 2024-10-10 2024-11-09 2024-12-14 2026-05-18 es and other vehicles in urba vement and Agricultural Plas nvelope ementation n and rural centralized collec tic Waste Management Pilot tion sites CPWRP-BJCC-G-02 / Equipme Component 2: Municipal Soli nt procurement for waste cla d Waste Management Impro Single Stage - One E Pending Impl IBRD / 94700 Post Request for Bids Open - National 1,760,000.00 0.00 2024-08-30 2024-09-06 2024-10-18 2024-11-17 2024-12-22 2026-05-26 ssification publicity and prom vement and Agricultural Plas nvelope ementation otion activities in east area o tic Waste Management Pilot f Chencang District CPWRP-BJCC-G-03 / Equipme Component 2: Municipal Soli nt procurement for waste cla d Waste Management Impro Single Stage - One E Pending Impl IBRD / 94700 Post Request for Bids Open - National 1,080,000.00 0.00 2024-10-25 2024-11-01 2024-12-13 2025-01-12 2025-02-16 2025-04-09 ssification publicity and prom vement and Agricultural Plas nvelope ementation otion activities in west area o tic Waste Management Pilot f Chencang District CPWRP-LW-G-01-1 / Collectio Component 2: Municipal Soli n and transfer vehicles for 2 d Waste Management Impro Request for Quota Single Stage - One E Pending Impl IBRD / 94700 Post Open - National 480,000.00 0.00 2024-08-02 2024-10-11 2026-03-15 pilot towns (Xiagui Town and vement and Agricultural Plas tions nvelope ementation Yangguo Town) (pilot) tic Waste Management Pilot CPWRP-LW-G-01-2 / Vehicles Component 2: Municipal Soli for urban areas (Chelei and S d Waste Management Impro Single Stage - One E Pending Impl IBRD / 94700 Post Request for Bids Open - National 3,930,000.00 0.00 2024-11-13 2024-11-20 2025-01-01 2025-01-31 2025-03-07 2026-08-09 hengli Street) and Shuangch vement and Agricultural Plas nvelope ementation uang Base transfer station tic Waste Management Pilot Page 1 CPWRP-LW-G-03 / Equipmen Component 2: Municipal Soli t procurement for waste clas d Waste Management Impro Single Stage - One E Pending Impl sification publicity and promo IBRD / 94700 Post Request for Bids Open - National 880,000.00 0.00 2024-07-25 2024-08-01 2024-09-12 2024-10-12 2024-11-16 2026-04-20 vement and Agricultural Plas nvelope ementation tion activities in Duqiao Subd tic Waste Management Pilot istrict Office and Renmin Sub district Office CPWRP-LW-G-04 / Equipmen Component 2: Municipal Soli t procurement for waste clas d Waste Management Impro Single Stage - One E Pending Impl sification publicity and promo IBRD / 94700 Post Request for Bids Open - National 790,000.00 0.00 2024-09-27 2024-10-04 2024-11-15 2024-12-15 2025-01-19 2026-06-23 vement and Agricultural Plas nvelope ementation tion activities in Jiefang Subdi tic Waste Management Pilot strict Office and Xiangyang S ubdistrict Office CPWRP-LW-G-07 / Procurem Component 2: Municipal Soli ent of waste collection faciliti d Waste Management Impro Request for Quota Single Stage - One E Pending Impl IBRD / 94700 Post Open - National 240,000.00 0.00 2024-08-01 2024-10-26 2026-03-30 es in 2 pilot towns (Xiagui To vement and Agricultural Plas tions nvelope ementation wn and Yangguo Town) (pilot tic Waste Management Pilot ) CPWRP-CC-G-02 / Exhibition arrangement and equipment Component 2: Municipal Soli procurement for the publicity d Waste Management Impro Single Stage - One E Pending Impl IBRD / 94700 Post Request for Bids Open - National 650,000.00 0.00 2024-08-30 2024-09-06 2024-10-18 2024-11-17 2024-12-22 2026-05-26 and education base, and equi vement and Agricultural Plas nvelope ementation pment procurement for town tic Waste Management Pilot ship waste classification publ icity and promotion activities CPWRP-PPMO-G-01-1 / Procu Component 3: Project Manag Request for Quota Single Stage - One E Pending Impl rement of the first batch of c IBRD / 94700 ement, Monitoring and Evalu Post Open - National 10.00 0.00 2024-07-24 2024-09-21 2026-02-23 tions nvelope ementation ounty (district) office equipm ation ent CPWRP-PPMO-G-01-2 / Procu Component 3: Project Manag Request for Quota Single Stage - One E Pending Impl rement of the second batch o IBRD / 94700 ement, Monitoring and Evalu Post Open - National 13.00 0.00 2024-12-27 2025-03-24 2026-08-26 tions nvelope ementation f county (district) office equip ation ment NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 2