PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Tanzania : Second Tanzania Intermodal and Rail Development Project PLAN General Information Country: Tanzania 2021-12-03 Bank’s Approval Date of the Original Procurement Plan: 2024-04-29 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P176682 GPN Date: 2023-03-21 Project Name: Second Tanzania Intermodal and Rail Development Project Loan / Credit No: IDA / 54140, / , IDA / 75290 TANZANIA RAILWAYS CORPORATION Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-RAHCO-266015-CS-QCBS / Detailed Engineering Desig Component A: Strengthenin n and Preparation of Procure g of Railway Infrastructure a Quality And Cost- Open - Internationa Under Implement IDA / 54140 Prior 1,035,352.50 0.00 2021-12-07 2021-12-17 2022-01-04 2021-12-24 2022-02-15 2022-11-15 2022-03-15 2022-08-10 2022-03-29 2023-02-24 2022-04-26 2023-06-09 2022-06-07 2022-11-04 ment Documents for Tabora - nd Support of Transport Stu Based Selection l ation Isaka Railway Track and Stru dies ctures Rehabilitation Works ( 135 km). TZ-RAHCO-266238-CS-QCBS / Detailed Engineering Desig Component D:Institutional St Quality And Cost- Open - Internationa Under Implement n and Preparation of Procure IDA / 54140 rengthening and Capacity B Prior 1,405,372.50 0.00 2021-12-07 2021-12-17 2022-01-04 2021-12-24 2022-02-15 2023-07-26 2022-03-15 2022-08-10 2022-03-29 2023-08-01 2022-04-26 2023-08-03 2022-06-07 2022-12-04 Based Selection l ation ment Documents for Dar es S uilding alaam - Tabora Railway Reha bilitation Works TZ-TRC-386540-CS-QCBS / P rovision of Consultancy Servi ces for Undertaking the Feasi bility Study, Detailed Enginee Component B: Strengthenin Quality And Cost- Open - Internationa ring Design, Preparation of Pr / g Climate Resilience of Kilos Prior 1,915,789.00 0.00 Canceled 2023-10-12 2023-11-10 2024-02-08 2024-03-31 2024-04-14 2024-06-23 2024-08-30 2025-08-30 Based Selection l ocurement Document, Enviro a-Gulwe-Igandu Section nmental and Social Impact A ssessment for the flood man agement strategies at Kinyas ungwe Sub Catchment Area. TZ-TRC-386072-CS-QCBS / P ROVISION OF EXPERTS TO TR Component C: Operational a Quality And Cost- Open - Internationa Under Implement / Prior 1,500,000.00 0.00 2023-10-20 2023-11-20 2023-11-20 2023-11-22 2024-02-19 2024-02-26 2024-04-11 2024-04-25 2024-07-04 2024-09-10 2026-09-10 C TO REINFORCE THE IMPLE nd Institutional Support Based Selection l ation MENTETATION OF TIRP 2 TZ-TRC-403506-CS-QCBS / S Component A: Strengthenin upervision of Railway Track a g of Railway Infrastructure a Quality And Cost- Open - Internationa Under Implement nd Structures (Bridges and C / Prior 2,306,740.00 0.00 2024-01-22 2024-03-22 2024-01-25 2024-04-17 2024-03-21 2024-04-20 2024-06-01 2024-07-06 2024-08-10 2025-11-08 nd Support of Transport Stu Based Selection l ation ulverts) Rehabilitation Works dies along Tabora to Isaka Sectio n (135 km) TZ-TRC-403509-CS-QCBS / P rovision of Consultant for Sup Component A: Strengthenin ervision of Railway Track and g of Railway Infrastructure a Quality And Cost- Open - Internationa Under Implement / Prior 2,135,140.00 0.00 2024-01-22 2024-03-18 2024-02-12 2024-04-17 2024-03-27 2024-04-24 2024-05-24 2024-06-28 2024-08-02 2025-08-02 Structures (Bridges and Culv nd Support of Transport Stu Based Selection l ation erts) Rehabilitation Works alo dies ng Dar es Salaam to Tabora s ection (840.172km) TZ-TRC-421003-CS-QCBS / P ROVISION OF CONSULTANCY SERVICES FOR DESIGNING A Component C: Operational a Quality And Cost- Pending Impleme IDA / 75290 Post Open - National 317,184.00 0.00 2024-04-30 2024-05-21 2024-07-04 2024-08-01 2024-08-31 2024-10-05 2024-11-09 2025-07-07 N INFRASTRUCTURE ACCESS nd Institutional Support Based Selection ntation REGIME AND NETWORK STAT EMENT FOR TANZANIA RAILW AYS CORPORATION INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual TZ-TRC-343042-CS-CDS / Pr Component B: Strengthenin ovision of Consultancy Servic Direct - Internation Under Implement / g Climate Resilience of Kilos Prior Direct Selection 264,000.00 0.00 2023-03-23 2023-03-30 2023-03-27 2022-11-30 2023-04-19 2025-04-18 es of Project Manager to the al ation a-Gulwe-Igandu Section Project Implementation Team (PIT) TZ-TRC-343512-CS-CDS / Pr Component B: Strengthenin ovision of Consultancy Servic Direct - Internation Under Implement / g Climate Resilience of Kilos Prior Direct Selection 283,200.00 0.00 2023-03-23 2023-04-11 2023-03-27 2022-11-30 2023-04-20 2025-04-19 es of the Procurement Specia al ation a-Gulwe-Igandu Section list to the Project Implementa tion Team (PIT) TZ-TRC-343513-CS-CDS / Pr ovision Consultancy Services Component B: Strengthenin Direct - Internation Under Implement for Financial Management an / g Climate Resilience of Kilos Prior Direct Selection 283,200.00 0.00 2023-03-23 2023-04-05 2023-03-28 2022-11-30 2023-04-20 2025-04-19 al ation d Accounting Specialist to th a-Gulwe-Igandu Section e Project Implementation Tea m (PIT) Page 1 TZ-TRC-343514-CS-CDS / Pr Component B: Strengthenin ovision of Consultancy Servic Direct - Internation / g Climate Resilience of Kilos Post Direct Selection 264,000.00 0.00 Canceled 2023-03-23 2022-11-30 2023-03-27 2023-04-19 2025-04-18 es of the Senior Project Engin al a-Gulwe-Igandu Section eer to the Project Implement ation Team (PIT) TZ-TRC-356159-CS-CDS / Pr Component B: Strengthenin ovision of consultancy servic Direct - Internation IDA / 75290 g Climate Resilience of Kilos Prior Direct Selection 264,000.00 0.00 Signed 2023-04-13 2023-04-26 2023-04-18 2022-11-30 2023-05-12 2025-05-11 es of the Senior Project Engin al a-Gulwe-Igandu Section eer to the Project Implement ation Team(PIT) Page 2