PROCUREMENT PLAN (Textual Part) Project information: UGANDA :UG Investing in Forests and PAs Project (P170466) Project Implementation agency: Ministry of Works and Environment Date of the Procurement Plan: 15 June 2021 Period covered by this Procurement Plan: June 2021 – Dec 2022 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in the Public Procurement and Disposal of Public Assets Act,2003 , such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. The BUBU Policy, Preference and Reservation Schemes shall not apply When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Works: is applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information. None PROCUREMENT Uganda : Uganda Investing in Forests and Protected Areas for Climate-Smart Development Project PLAN General Information Country: Uganda 2021-10-12 Bank’s Approval Date of the Original Procurement Plan: 2024-04-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P170466 GPN Date: 2021-06-23 Project Name: Uganda Investing in Forests and Protected Areas for Climate-Smart Development Project Loan / Credit No: IDA / 65920, IDA / D5960 National Forestry Authority Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned UG-NFA-252814-CW-RFQ / C National Procure onstruction of 2 Bird hides an Component 1. Improved Ma ment Document - Request for Quota Single Stage - One E 2022-05-2 d 200m Board Walk in Echuy IDA / 65920 nagement of Protected Area Post Open - National 1 Envelope proce 63,200.00 0.00 Canceled 2021-10-05 2021-11-30 tions nvelope 9 a, Development of 1 Campin s ss (Non Bank-SPD g site ,docking area and Picn ) ic Site in Kashoya Kitomi UG-NFA-401696-CW-RFB / C Request for Bids - ONSTRUCTION OF THE VISIT Component 2. Increased Rev Single Stage - One E Works (without pr 2025-01-1 OR INFORMATION CENTERS IDA / 65920 enues and Jobs from Forests Post Request for Bids Open - National 2,341,780.51 0.00 Canceled 2024-02-23 2024-03-04 2024-03-09 2024-04-08 2024-05-18 nvelope equalification) SP 3 AT BUSIGIRO IN BUDONGO, E and Wildlife Protected Areas D CHUYA AND BUGOMA CENTR AL FOREST RESERVES. UG-NFA-422808-CW-RFB / C Request for Bids - ONSTRUCTION OF THE VISIT Component 2. Increased Rev Single Stage - One E Small Works SPD Pending Imp 2024-10-2 OR INFORMATION CENTERS A IDA / 65920 enues and Jobs from Forests Post Request for Bids Open - National 2,341,780.51 0.00 2024-04-30 2024-05-30 2024-05-31 2024-06-15 2024-07-25 nvelope (1 envelope proce lementation 3 T BUSINGIRO IN BUDONGO, E and Wildlife Protected Areas ss) CHUYA AND BUGOMA CENTR AL FOREST RESERVES UG-NFA-401648-CW-RFP / D Request for Propo Component 2. Increased Rev ESIGN AND CONSTRUCTION Request for Propo Single Stage - Two E sal Design and Bu Pending Imp 2025-02-1 IDA / 65920 enues and Jobs from Forests Post Open - National 57,400.00 0.00 2024-05-10 2024-06-09 2024-06-10 2024-07-10 2024-08-19 OF 300M BOARD WALK, BIRD sals nvelope ild - Works SPD (S lementation 5 and Wildlife Protected Areas HIDES, JETTY DOCKING AREA ingle-stage) AND A PICNIC SITE GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-NFA-252156-GO-RFQ / S Component 1. Improved Ma upply of 2,200 kg Seeds of A Request for Quota Single Stage - One E Under Imple IDA / 65920 nagement of Protected Area Post Limited 42,960.00 0.00 2021-09-21 2021-11-16 2021-12-16 ssorted Indigenous Species f tions nvelope mentation s or Restoration of Degraded A reas in CFRs UG-NFA-252159-GO-RFQ / S Component 1. Improved Ma Request for Quota Single Stage - One E Pending Impl upply of 2,148 kg Polyester b IDA / 65920 nagement of Protected Area Post Limited 85,919.00 0.00 2021-10-05 2021-11-30 2021-12-30 tions nvelope ementation ags for Restoration of Degrad s ed Areas in CFRs UG-NFA-252139-GO-RFB / Su Component 1. Improved Ma Single Stage - One E Pending Impl pply and Delivery of IT Equip IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 183,150.00 0.00 2021-11-08 2021-11-13 2021-12-25 2022-01-24 2022-02-28 2022-08-27 nvelope ementation ment for Office, Field and For s est Monitoring UG-NFA-252117-GO-RFQ / S Component 1. Improved Ma upply and Delivery of One (1) Single Stage - One E Pending Impl IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 476,622.00 0.00 2021-10-25 2021-10-30 2021-12-11 2022-01-10 2022-02-14 2022-08-13 Bull Dozer and One (1) Tippe nvelope ementation s r under IFPA/CD Project UG-NFA-252110-GO-RFQ / S upply of Vehicles under IFPA/ Component 1. Improved Ma Single Stage - One E Pending Impl CD Project (6 Double Cabin P IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 629,324.00 0.00 2021-12-13 2021-12-18 2022-01-29 2022-02-28 2022-04-04 2022-10-01 nvelope ementation ick Ups, 1 Station Wagon , 1 s vehicle for project supervisio n) UG-NFA-252150-GO-RFB / Su pply , Delivery and installatio Component 1. Improved Ma Single Stage - One E n of 1,327 pillars to be used f IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 597,150.00 0.00 Canceled 2021-12-13 2021-12-18 2022-01-29 2022-02-28 2022-04-04 2022-10-01 nvelope or boundary demarcation at s all boundaries that will be res urveyed UG-NFA-253317-CS-CQS / Pu Component 1. Improved Ma Single Stage - One E rchase of 7000 beehives and IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 155,698.00 0.00 Canceled 2021-11-08 2021-11-13 2021-12-25 2022-01-24 2022-02-28 2022-08-27 nvelope associated equipment s UG-NFA-252143-GO-RFQ / S Component 1. Improved Ma Request for Quota Single Stage - One E IDA / 65920 Post Limited 28,800.00 0.00 Signed 2022-03-25 2022-03-31 2022-05-20 2022-06-06 2022-11-16 upply and Delivery of Field M nagement of Protected Area tions nvelope aterials s UG-NFA-252147-GO-RFQ / S Component 2. Increased Rev Request for Quota Single Stage - One E upply of 16 signage to be use IDA / 65920 enues and Jobs from Forests Post Limited 8,000.00 0.00 Canceled 2021-09-21 2021-11-16 2021-12-16 tions nvelope d for boundary demarcation and Wildlife Protected Areas UG-NFA-283567-GO-RFB / Su pply , Delivery and installatio Component 1. Improved Ma Single Stage - One E Pending Impl n of 575 pillars to be used for IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 258,750.00 0.00 2022-03-22 2022-03-27 2022-05-08 2022-06-07 2022-07-12 2023-01-08 nvelope ementation boundary demarcation at all s boundaries that will be resur veyed UG-NFA-313810-GO-RFB / Su Component 1. Improved Ma Single Stage - One E pply of Beehives and Associa IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 311,396.00 0.00 Signed 2022-09-25 2022-10-28 2022-09-30 2022-10-28 2022-11-11 2022-12-08 2022-12-11 2023-01-17 2023-01-15 2023-05-09 2023-07-14 nvelope ted Equipment s UG-NFA-252119-GO-RFQ / S Component 1. Improved Ma Single Stage - One E IDA / 65920 Post Request for Bids Open - National 123,634.00 0.00 Signed 2021-12-12 2022-09-19 2021-12-17 2022-10-28 2022-01-28 2022-12-08 2022-02-27 2023-01-24 2022-04-03 2023-05-02 2022-09-30 upply and Delivery of 28 Mot nagement of Protected Area nvelope orcycles s UG-NFA-312528-GO-RFQ / Pr Component 1. Improved Ma Request for Quota Single Stage - One E IDA / 65920 Post Limited 22,210.00 0.00 Canceled 2022-10-01 2022-11-26 2023-05-25 ocurement of Food Rations fo nagement of Protected Area tions nvelope r Patrols s UG-NFA-329308-GO-RFQ / Pr Component 1. Improved Ma Request for Quota Single Stage - One E ocurement of Polyester bags IDA / 65920 nagement of Protected Area Post Limited 85,919.00 0.00 Completed 2023-03-03 2023-03-23 2023-04-28 2023-07-13 2023-10-25 2023-08-24 tions nvelope for production of seedlings s Page 1 UG-NFA-335523-GO-RFQ / Pr Component 1. Improved Ma Request for Quota Single Stage - One E ocurement of seeds for prod IDA / 65920 nagement of Protected Area Post Limited 42,960.00 0.00 Signed 2023-03-24 2023-03-23 2023-05-22 2023-05-31 2023-08-20 tions nvelope uction of seedlings under IFP s A-CD Project UG-NFA-370355-GO-RFQ / D ESIGN, SUPPLY AND INSTALL Component 2. Increased Rev Request for Quota Single Stage - One E ATION OF 16 SIGNAGES FOR IDA / 65920 enues and Jobs from Forests Post Limited 8,000.00 0.00 Signed 2023-08-05 2023-07-31 2023-10-09 2023-10-02 2024-04-06 tions nvelope PUBLICITY, VISIBILITY AND A and Wildlife Protected Areas WARENESS IN DIFFERENT CE NTRAL FOREST RESERVES UG-NFA-367514-GO-RFB / D ESIGN AND ESTABLISHMENT Component 2. Increased Rev Single Stage - One E OF AN ONLINE RESERVATION IDA / 65920 enues and Jobs from Forests Post Request for Bids Open - National 67,000.00 0.00 Canceled 2023-08-31 2023-09-05 2023-10-17 2023-11-16 2023-12-21 2024-06-18 nvelope AND PAYMENT SYSTEM FOR and Wildlife Protected Areas ECOTOURISM ACTIVITIES IN C ENTRAL FOREST RESERVES UG-NFA-380932-GO-RFB / S UPPLY AND INSTALLATION OF Component 1. Improved Ma Single Stage - One E Under Imple BOUNDARY PILLARS TO BE U IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 491,004.40 0.00 2023-10-31 2023-09-14 2023-11-10 2023-10-26 2023-12-10 2023-12-30 2024-02-10 2024-05-10 nvelope mentation SED FOR BOUNDARY DEMAR s CATION AT ALL BOUNDARIES THAT WILL BE RESURVEYED UG-NFA-384138-GO-RFQ / P Component 1. Improved Ma Request for Quota Single Stage - One E ROCUREMENT OF SEEDS FOR IDA / 65920 nagement of Protected Area Post Limited 42,376.72 0.00 Signed 2023-10-15 2023-11-13 2023-11-30 2023-12-20 2024-01-29 tions nvelope PRODUCTION OF SEEDLINGS s UG-NFA-384211-GO-RFQ / P Component 1. Improved Ma Request for Quota Single Stage - One E Pending Impl ROCUREMENT OF POLYESTER IDA / 65920 nagement of Protected Area Post Limited 79,393.99 0.00 2023-10-15 2023-11-25 2024-01-24 tions nvelope ementation BAGS FOR PRODUCTION OF S s EEDLINGS UG-NFA-394109-GO-RFB / P Component 1. Improved Ma ROCUREMENT OF FOUR (04) Single Stage - One E Pending Impl IDA / D5960 nagement of Protected Area Post Request for Bids Open - National 387,133.00 0.00 2024-01-31 2024-03-01 2024-03-06 2024-03-26 2024-04-25 2024-10-22 DOUBLE CABIN PICKUPS AN nvelope ementation s D ONE (01) STATION WAGON UG-NFA-394115-GO-RFB / P Component 1. Improved Ma Single Stage - One E Pending Impl ROCUREMENT OF 10 (TEN) M IDA / D5960 nagement of Protected Area Post Request for Bids Open - National 50,000.00 0.00 2024-01-31 2024-03-01 2024-03-06 2024-03-26 2024-04-25 2024-06-24 nvelope ementation OTORCYCLES s NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-NFA-295880-NC-RFB / En richment Planting of 1,395 h Component 1. Improved Ma Single Stage - One E Pending Impl ectares in Budongo CFR, Kas IDA / 65920 nagement of Protected Area Post Request for Bids Open - National 253,969.70 0.00 2022-05-18 2022-05-23 2022-07-04 2022-08-03 2022-09-07 2023-03-06 nvelope ementation okwa CFR, Nyakarongo CFR, s Kagombe CFR and Bugoma C FR UG-NFA-322237-NC-RFQ / Su Component 1. Improved Ma Request for Quota Single Stage - One E Pending Impl pport to 14 women groups to IDA / 65920 nagement of Protected Area Post Limited 43,243.00 0.00 2022-12-24 2023-02-18 2023-08-17 tions nvelope ementation start business in craft makin s g UG-NFA-328863-NC-RFQ / R Component 1. Improved Ma Request for Quota Single Stage - One E aising of assorted seedlings( IDA / 65920 nagement of Protected Area Post Limited 85,919.00 0.00 Signed 2023-01-27 2023-04-19 2023-03-24 2023-07-19 2023-09-20 tions nvelope labour and soils) under IFPA- s CD UG-NFA-335538-NC-RFB / En Component 1. Improved Ma Single Stage - One E Under Imple IDA / 65920 Post Request for Bids Open - National 270,000.00 0.00 2023-03-31 2023-04-25 2023-04-05 2023-06-07 2023-05-17 2023-06-16 2023-07-21 2024-01-17 richment planting nagement of Protected Area nvelope mentation s UG-NFA-393995-NC-RFQ / R AISING AND MAINTENANCE O F ASSORTED INDIGENOUS SE Component 1. Improved Ma Request for Quota Single Stage - One E Pending Impl EDLINGS FOR ENRICHMENT P IDA / 65920 nagement of Protected Area Post Limited 17,650.79 0.00 2023-12-05 2024-01-19 2024-07-17 tions nvelope ementation LANTING IN SELECTED CENT s RAL FOREST RESERVES WITH IN SOUTH WEST RANGE AND MUZIZI RANGE UG-NFA-423419-NC-RFP / DE SIGN AND ESTABLISHMENT O Component 2. Increased Rev Request for Propo Single Stage - Two E Pending Impl F AN ONLINE RESERVATION A IDA / 65920 enues and Jobs from Forests Post Open - National 67,000.00 0.00 2024-05-10 2024-06-09 2024-06-10 2024-07-04 2024-08-13 2024-12-11 sals nvelope ementation ND PAYMENT SYSTEM FOR E and Wildlife Protected Areas COTOURISM ACTIVITIES IN CE NTRAL FOREST RESERVES CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-NFA-252816-CS-CQS / Te Component 1. Improved Ma chnical Service Provider to H Consultant Qualifi Pending Impleme IDA / 65920 nagement of Protected Area Post Open - National 43,243.00 0.00 2021-09-30 2021-10-21 2021-12-04 2022-01-03 2022-02-07 2022-08-06 elp 14 Women Groups to Star cation Selection ntation s t business in Craft Making UG-NFA-252817-CS-CQS / Co Component 2. Increased Rev Consultant Qualifi nsultancy Services to Design, IDA / 65920 enues and Jobs from Forests Post Open - National 67,000.00 0.00 Canceled 2021-09-30 2021-10-20 2021-10-21 2021-12-04 2022-01-03 2022-02-07 2022-08-06 cation Selection Install a central Reservation and Wildlife Protected Areas System UG-NFA-253316-CS-CQS / Hi Component 1. Improved Ma Consultant Qualifi re of a consultant to conduct IDA / 65920 nagement of Protected Area Post Limited 11,200.00 0.00 Canceled 2021-11-05 2021-10-20 2021-11-19 2021-12-19 2022-01-23 2022-07-22 cation Selection 5 ESIA studies for new roads s UG-NFA-253323-CS-CQS / Hi Component 1. Improved Ma re of a consultant to help co Consultant Qualifi Pending Impleme IDA / 65920 nagement of Protected Area Post Limited 34,595.00 0.00 2021-09-30 2021-10-14 2021-11-13 2021-12-18 2022-06-16 mmunities establish and man cation Selection ntation s age commercial tree nursery UG-NFA-253325-CS-CQS / Co nsultancy services to conduc Component 1. Improved Ma Consultant Qualifi Under Implement t inventory of infestation by i IDA / 65920 nagement of Protected Area Post Open - National 208,996.00 0.00 2021-09-30 2021-10-20 2021-10-21 2022-08-02 2021-12-04 2022-01-03 2022-02-07 2022-08-06 cation Selection ation nvasive species and develop s ment of management plans Page 2 UG-NFA-278055-CS-CQS / Co nsultancy services to Design and prepare costed BOQs for Component 1. Improved Ma Consultant Qualifi construction and supervision IDA / 65920 nagement of Protected Area Post Open - National 250,000.00 0.00 Canceled 2022-02-21 2022-07-15 2022-03-14 2022-04-27 2022-05-27 2022-07-01 2022-12-28 cation Selection of New Roads and rehabilitati s on of existing ones in Budong o, Wambabya, Kagombe and Rwensambya Forest Reserve s UG-NFA-313813-CS-CQS / St Component 2. Increased Rev Consultant Qualifi aff training in tourism activiti IDA / 65920 enues and Jobs from Forests Post Open - National 34,000.00 0.00 Canceled 2022-09-26 2023-10-27 2022-10-17 2022-11-30 2022-12-30 2023-02-03 2023-08-02 cation Selection es and Wildlife Protected Areas UG-NFA-332610-CS-QCBS / S Component 1. Improved Ma upport for the Establishment Quality And Cost- Open - Internationa Under Implement IDA / 65920 nagement of Protected Area Post 356,766.00 0.00 2023-02-14 2023-05-15 2023-02-28 2023-06-23 2023-04-13 2023-04-28 2023-05-28 2023-07-02 2023-08-13 2024-02-29 of New Collaborative Forest Based Selection l ation s Management Agreements UG-NFA-361682-CS-CQS / C ONSULTANCY SERVICES FOR DESIGN AND PREPARATION O Component 4. Project Manag Consultant Qualifi F COSTED BOQ's FOR CONST IDA / 65920 Post Open - National 141,447.78 0.00 Canceled 2023-07-31 2023-06-16 2023-08-21 2023-10-30 2023-11-29 2024-01-03 2024-07-01 ement and Monitoring cation Selection RUCTION AND SUPERVISION OF NEW ROADS AND REHABI LITATION OF EXISTING ONES IN 27 CENTRAL FOREST RESE RVES UG-NFA-307301-CS-CQS / D esign and Establishment of a Component 2. Increased Rev Consultant Qualifi n Online Reservation and Pay IDA / 65920 enues and Jobs from Forests Post Open - National 67,000.00 0.00 Canceled 2022-10-16 2022-09-27 2022-11-06 2022-12-20 2023-01-19 2023-02-23 2023-08-22 cation Selection ment System for Ecotourism and Wildlife Protected Areas Activities in Central Forest Re serves UG-NFA-393997-CS-CQS / C Component 2. Increased Rev Consultant Qualifi Under Implement ONSULTANCY SERVICES FOR IDA / 65920 enues and Jobs from Forests Post Open - National 32,602.74 0.00 2023-11-30 2023-12-06 2023-12-10 2024-02-08 2024-02-28 2024-03-29 2024-05-28 cation Selection ation STAFF TRAINING IN TOURISM and Wildlife Protected Areas ACTIVITIES UG-NFA-401580-CS-CQS / C ONSULTANCY SERVICES TO T RAIN COLLABORATIVE FORES Component 1. Improved Ma Consultant Qualifi Under Implement T MANAGEMENT GROUP MEM IDA / 65920 nagement of Protected Area Post Open - National 48,648.00 0.00 2024-02-22 2024-03-04 2024-02-24 2024-04-24 2024-05-24 2024-06-15 2024-12-12 cation Selection ation BERS IN TOUR GUIDING SKIL s LS IN BUDONGO, BUGOMA, E CHUYA, AND KALINZU CENTR AL FOREST RESERVES UG-NFA-423429-CS-CQS / C ONSULTANCY SERVICES FOR DESIGN, PREPARATION OF C OSTED BOQ'S AND UNDERTA Component 4. Project Manag Consultant Qualifi Pending Impleme IDA / 65920 Post Open - National 137,135.13 0.00 2024-05-31 2024-06-10 2024-08-19 2024-08-24 2024-10-03 2025-05-31 KING ENVIRONMENTAL AND ement and Monitoring cation Selection ntation SOCIAL IMPACT ASSESSMENT FOR CONSTRUCTION AND SU PERVISION OF ROADS IN SEL ECTED FOREST RESERVES INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UG-NFA-252821-CS-INDV / H ire of an individual consultan Component 2. Increased Rev Individual Consult t to carry our staff training o IDA / 65920 enues and Jobs from Forests Post Open 21,054.00 0.00 Canceled 2021-09-30 2022-01-28 2021-11-18 2021-12-09 2022-01-13 2022-07-12 ant Selection n Tourism and train 3 CFM and Wildlife Protected Areas Groups in Tour Guiding Skills UG-NFA-278069-CS-INDV / R Component 4. Project Manag Individual Consult ecruitment of a Procurement IDA / 65920 Post Open 108,000.00 0.00 Canceled 2022-02-14 2022-04-04 2022-04-25 2022-05-30 2022-11-26 ement and Monitoring ant Selection Assistant under IFPA-CD Proj ect UG-NFA-305131-CS-INDV / P Component 4. Project Manag Individual Consult IDA / 65920 Post Open - National 72,411.42 0.00 Signed 2022-08-31 2022-08-02 2022-10-27 2022-11-25 2022-11-17 2022-12-23 2022-12-22 2023-01-15 2023-06-20 rocurement Officer under IFP ement and Monitoring ant Selection A-CD UG-NFA-318089-CS-CDS / Fu Component 4. Project Manag Under Implement ll time consultant to provide IDA / 65920 Post Direct Selection Direct - National 210,000.00 0.00 2022-09-26 2022-10-19 2022-10-06 2022-12-10 2023-06-08 ement and Monitoring ation support on project technical coordination UG-NFA-255511-CS-CDS / Fu Component 4. Project Manag Individual Consult ll time consultant to provide IDA / 65920 Prior Open 210,000.00 0.00 Canceled 2021-11-07 2022-02-03 2021-12-26 2022-01-16 2022-02-20 2022-08-19 ement and Monitoring ant Selection support on project technical coordination UG-NFA-364081-CS-CDS / C ONDUCTING ESIA STUDY FOR Component 4. Project Manag Under Implement IDA / 65920 Post Direct Selection Direct - National 39,555.55 0.00 2023-07-21 2023-10-27 2023-09-04 2023-11-04 2024-05-02 CONSTRUCTING CANOPY WA ement and Monitoring ation LK IN BUDONGO CFR Page 3