PROCUREMENT PLAN (Textual Part)
Project information: Country: Democratic Republic of Congo; Project name:
DRC Enhancing Collection of Revenue and Expenditure Management
Project (ENCORE), Project number: P171762
Project Implementation agency: Comité d’Orientation de la Réforme des
Finances Publiques (COREF)


Date of the Procurement Plan: 02/12/2021
Period covered by this Procurement Plan: from 12/02/2021 to 05/01/2021
Preamble

In accordance with paragraph 5.9 of the “World Bank Procurement Regulations
for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s
Systematic Tracking and Exchanges in Procurement (STEP) system will be
used to prepare, clear and update Procurement Plans and conduct all
procurement transactions for the Project.

This textual part along with the Procurement Plan tables in STEP constitute the
Procurement Plan for the Project. The following conditions apply to all
procurement activities in the Procurement Plan. The other elements of the
Procurement Plan as required under paragraph 4.4 of the Procurement
Regulations are set forth in STEP.

The Bank’s Standard Procurement Documents: shall be used for all
contracts subject to international competitive procurement and those
contracts as specified in the Procurement Plan tables in STEP.

National Procurement Arrangements: In accordance with paragraph 5.3
of the Procurement Regulations, when approaching the national market (as
specified in the Procurement Plan tables in STEP), the country’s own
procurement procedures may be used.
When the Borrower uses its own national open competitive procurement
arrangements as set forth in [insert appropriate references to the national
procurement legislation: “Not applicable”], such arrangements shall be
subject to paragraph 5.4 of the Procurement Regulations and the following
conditions.
Leased Assets as specified under paragraph 5.10 of the Procurement
Regulations: Leasing may be used for those contracts identified in the
Procurement Plan tables. “Not Applicable”
Procurement of Secondhand Goods as specified under paragraph 5.11 of
the Procurement Regulations – is allowed for those contracts identified in the
Procurement Plan tables “Not Applicable”
Domestic preference as specified under paragraph 5.51 of the Procurement
Regulations (Goods and Works).
    Goods: is not applicable for those contracts identified in the Procurement
    Plan tables.
    Works: is not applicable for those contracts identified in the Procurement
    Plan tables
                                                                                           Revue    Date prévue
                                                                               Méthode     par la       pour
Réf.                                                  Prévu/Ré                                                   Commentai
     Description*                                                Coût en $US      de      Banque    l'ouverture
No                                                       al.                                                        res
                                                                               sélection (priori/po   de l'offre
                                                                                             st)     technique
     Sélection des consultants
     Recrutement du personnel clé et du                              248
                                                       Prévu                      CI       Post        NA
 1   personnel d’appoint de l’Equipe du Projet                   600,00
     (Période PPA)                                     Réalisé

     Sélection d'un consultant cabinet                 Prévu
                                                                     150
                                                                                 QC        Post        NA
     international en vue de mener les études de                 000,00
 2
     faisabilité pour la mise en œuvre de E-           Réalisé
     Procurement en RDC

     Recrutement d'un Consultant international                            90
                                                       Prévu                      CI       Post     25-3-2022
 3   chargé de l’appui à la mise en œuvre du                     000,00
     SIGRH-Paie                                        Réalisé

     Sélection d'un consultant individuel chargé       Prévu
                                                                     70
                                                                                  CI       Post        NA
     d'appuyer l'élaboration des textes fixant les               000,00
 4
     modalités de répartition des recettes à           Réalisé
     caractère national

     Sélection d'un consultant individuel pour         Prévu
                                                                       50
                                                                                  CI       Post        NA
     réaliser une étude de faisabilité pour la mise              000,00
 5   en place des administrations provinciales du
     trésor, de la comptabilité et du budget dans      Réalisé
     3 provinces identifiées

     Sélection d'un consultant individuel pour                        50
     élaborer un cahier de charges de mise en          Prévu                      CI       Post        NA
                                                                 000,00
 6
     place d'un système intégré des recettes et
     des dépenses en Provinces                         Réalisé
                                                                                            Revue    Date prévue
                                                                                Méthode     par la       pour
Réf.                                                   Prévu/Ré                                                   Commentai
     Description*                                                 Coût en $US      de      Banque    l'ouverture
No                                                        al.                                                        res
                                                                                sélection (priori/po   de l'offre
                                                                                              st)     technique


     Sélection d'un Consultant individuel pour la       Prévu
                                                                        50
                                                                                   CI       Post        NA
     rédaction du manuel des procédures de                        000,00
 7
     gestion financière et de la passation des          Réalisé
     marchés du Projet ENCORE

     Sélection d'un Cabinet pour l'acquisition et le                    50
                                                        Prévu                     QC        Post        NA
 8   paramétrage du logiciel de stockage et                       000,00
     analyse des données du Suivi-Evaluation            Réalisé


     Sélection d'un Consultant cabinet pour             Prévu
                                                                        50
                                                                                  QC        Post        NA
     l'acquisition et le paramétrage du logiciel de               000,00
 9
     gestion de projet (technique et mise en            Réalisé
     œuvre des activités)

     Recrutement d'un Consultant individuel             Prévu
                                                                        45
                                                                                   CI       Post        NA
     chargé de la conception et la mise en œuvre                  000,00
10   d’une plateforme web pour la mise à jour du
     fichier de référence des agents de                 Réalisé
     l’Administration publique (FRAP 2)

     Sélection d'un Cabinet Webmaster pour la                           45
                                                        Prévu                     QC        Post        NA
11   mise en place du Site WEB de 3 provinces                     000,00
     sélectionnées                                      Réalisé

     Sélection d'un consultant international expert                     40
                                                        Prévu                      CI       Post
     en sondage pour 4 mois chargé                                000,00
12   d’accompagner l’équipe technique nationale
     dans l'organisation de l'enquête et                Réalisé
     l'actualisation de la base d'échantillonnage
                                                                                            Revue    Date prévue
                                                                                Méthode     par la       pour
Réf.                                                   Prévu/Ré                                                   Commentai
     Description*                                                 Coût en $US      de      Banque    l'ouverture
No                                                        al.                                                        res
                                                                                sélection (priori/po   de l'offre
                                                                                              st)     technique

     Sélection d'un consultant pour l'évaluation de                     30
                                                        Prévu                      CI       Post        NA
     la répartition effective (etude Benefit Sharing              000,00
13
     Assessment ou BSA) des recettes minières
                                                        Réalisé
     au niveau local (0.3% aux ETDs)

     Sélection d'un Consultant individuel pour la       Prévu
                                                                        30
                                                                                   CI       Post     18-3-2022
14   rédaction du manuel de vérification des PBCs                 000,00
     et PBPs du Projet ENCORE                           Réalisé


     Sélection d'un consultant cabinet chargé de                        25
                                                        Prévu                     SMC       Post        NA
15   l'Audit financier externe du PPA clos au                     000,00
     30/04/2022                                         Réalisé


     Sélection d'un Consultant Individuel chargé                        25
                                                        Prévu                      CI       Post        NA
16   d'élaborer le plan d'engagement                              000,00
     environnemental et social                          Réalisé

     Sélection d'un Consultant Individuel chargé                        25
                                                        Prévu                      CI       Post     5-3-2022
17   d'élaborer le plan de mobilisation des parties               000,00
     prenantes                                          Réalisé

                                                                        24
     Sélection d'un Consultant Individuel               Prévu                      CI       Post     5-3-2022
18                                                                000,00
     Ingénieur Génie Civil                              Réalisé

     Sélection d'un consultant international expert     Prévu
                                                                        20
                                                                                   CI       Post     5-3-2022
     en CAPI pour 2 mois qui seront chargés                       000,00
19
     d’accompagner l’équipe technique nationale
                                                        Réalisé
     dans l'organisation de l'enquête et
                                                                                                 Revue    Date prévue
                                                                                     Méthode     par la       pour
Réf.                                                       Prévu/Ré                                                    Commentai
     Description*                                                      Coût en $US      de      Banque    l'ouverture
No                                                            al.                                                         res
                                                                                     sélection (priori/po   de l'offre
                                                                                                   st)     technique
      l'actualisation de la base d'échantillonnage

      Sélection d'un Consultant pour appuyer la               Prévu
                                                                             16
                                                                                       ED        Post        NA
20    2ème phase de la mise en place de SIGMAP                         000,00
      (20 nouvelles cellules) (Pierre Tshiyombo)             Réalisé

                                                                                15
      Sélection d'un Cabinet Webmaster pour la                Prévu                    QC        Post        NA
21                                                                     000,00
      mise en place du Site WEB du Projet ENCORE             Réalisé


      Recrutement d'un Consultant Expert en                                     14
                                                              Prévu                     CI       Post        NA
      informatique et systèmes d’information                           000,00
22    chargé d’appuyer la mise en œuvre du
      Système Intégré de Gestion des Ressources              Réalisé
      Humaines et de la Paie (SIGRH-Paie)

      Recrutement d'un Consultant National                                      14
                                                              Prévu                     CI       Post        NA
      individuel en Administration Publique chargé                     000,00
23    d’appuyer la mise en œuvre du Système
      Intégré de Gestion des Ressources Humaines             Réalisé
      et de la Paie (SIGRH-Paie)

                                                                          1 175
                                                                       600,00


     SFQC : sélection fondée sur la qualité et le coût

     QC : sélection fondée sur les qualifications des consultants

     SMC : sélection au moindre coût
CI : sélection de Consultant individuel

ED: sélection par entente directe
PROCUREMENT
                Congo, Democratic Republic of : Enhancing Collection of Revenue and Expenditure Management Project
PLAN
General Information
Country:          Congo, Democratic Republic of                                                          2021-12-02
                                                    Bank’s Approval Date of the Original Procurement Plan:
                                                    Revised Plan Date(s): (comma delineated, leave blank 2024-04-23
                                                                                                         if none)
Project ID:       P171762                            GPN Date:                                           2022-06-14
Project Name:     Enhancing Collection of Revenue and Expenditure Management Project
Loan / Credit No: IDA / 70200, / , IDA / V4000
                  Comité d'Orientation de la Reforme des Finances Publiques
Executing Agency(ies):

WORKS
Activity Reference No. /                                                                                                                                                                       Procurement Estimated               Actual A                                                                                                                                                                     Bid Evaluation Report
                                  Loan / Credit N                                                                   Market Approac    Procurement Pr       Prequalification   High SEA/SH                                                        Process S     Draft Pre-qualificatio   Prequalification Evalu    Draft Bidding Docum Specific Procurement        Bidding Documents a   Proposal Submission                                                         Contract Comple
       Description                                        Component                Review Type       Method                                                                                   Document Typ Amount (U               mount (U                                                                                                                                                                     and Recommendatio           Signed Contract
                                         o.                                                                                h              ocess                 (Y/N)             Risk                                                             tatus          n Documents               ation Report           ent / Justification Notice / Invitation              s Issued        / Opening / Minutes                                                               tion
                                                                                                                                                                                                    e          S$)                   S$)                                                                                                                                                                             n for Award
                                                                                                                                                                                                                                                               Planned      Actual      Planned       Actual      Planned       Actual      Planned      Actual   Planned      Actual   Planned      Actual      Planned     Actual       Planned       Actual      Planned
                                                                                                                                                                                              Demande de cota
 ZR-COREF-345140-CW-RFQ /                           Component 1. Strengthenin
                                                                                                                                                                                              tions - DTPM Petit
Travaux de réhabilitation du                        g Public Resources Manage                                                         Single Stage - One                                                                                         En attente                                                                                                                                                                                                         2024-02-1
                                  IDA / 70200                                    A posteriori    Demande de prix    Open - National                                                           s travaux (urgenc    200,000.00           0.00                                                                                                2023-06-20                                                                                    2023-08-15
bâtiment devant abriter la ch                       ment at Central Governmen                                                         Envelope                                                                                                   d'exécution                                                                                                                                                                                                            1
                                                                                                                                                                                              e) - Avec compéti
ambre des comptes déconce                           t Level
                                                                                                                                                                                              tion
ntrées de Kananga
                                                                                                                                                                                              Demande de cota
 ZR-COREF-345177-CW-RFQ /
                                                    Component 3. Project and C                                                                                                                tions - DTPM Petit
Réhabilitation du bâtiment m                                                                                                          Single Stage - One                                                                                         En attente                                                                                                                                                                                                         2023-12-1
                                  IDA / 70200       hange Management, and E      A posteriori    Demande de prix    Open - National                                                           s travaux (urgenc    100,000.00           0.00                                                                                                2023-04-27                                                                                    2023-06-22
is à disposition pour la coordi                                                                                                       Envelope                                                                                                   d'exécution                                                                                                                                                                                                            9
                                                    mergency Response                                                                                                                         e) - Avec compéti
nation provinciale du Kasaï
                                                                                                                                                                                              tion
                                                                                                                                                                                              Demande de cota
 ZR-COREF-345180-CW-RFQ /                           Component 3. Project and C                                                                                                                tions - DTPM Petit
                                                                                                                                      Single Stage - One                                                                                         En attente                                                                                                                                                                                                         2023-12-2
Réhabilitation des bâtiments      IDA / 70200       hange Management, and E      A posteriori    Demande de prix    Open - National                                                           s travaux (urgenc    145,000.00           0.00                                                                                                2023-05-03                                                                                    2023-06-28
                                                                                                                                      Envelope                                                                                                   d'exécution                                                                                                                                                                                                            5
de la coordination nationale                        mergency Response                                                                                                                         e) - Avec compéti
                                                                                                                                                                                              tion

 ZR-COREF-345109-CW-RFQ /
Appui à l'aménagement des l
                                                    Component 1. Strengthenin                                                                                                                 Demande de cota
ocaux devant abriter les post
                                                    g Public Resources Manage                                                         Single Stage - One                                      tions (DTPM ne pr                                  En attente                                                                                                                                                                                                         2023-12-2
es du réseau comptable à Ki       IDA / 70200                                    A posteriori    Demande de prix    Limited                                                                                        150,000.00           0.00                                                                                                2023-04-30                                                                                    2023-06-25
                                                    ment at Central Governmen                                                         Envelope                                                ovenant pas de la                                  d'exécution                                                                                                                                                                                                            2
nshasa pour les postes comp
                                                    t Level                                                                                                                                   Banque)
tables des 4 ministères déco
ncentrés (EPST, Santé, ITPR
et Développement Rural) + l'
ACCT
                                                                                                                                                                                              Demande de cota
 ZR-COREF-356044-CW-RFQ /                           Component 1. Strengthenin
                                                                                                                                                                                              tions - DTPM Petit
Travaux d’aménagement du                            g Public Resources Manage                                                         Single Stage - One                                                                                         En attente                                                                                                                                                                                                         2024-01-2
                                  IDA / 70200                                    A posteriori    Demande de prix    Limited                                                                   s travaux (urgenc      50,000.00          0.00                                                                                                2023-05-30                                                                                    2023-07-25
local technique du datacente                        ment at Central Governmen                                                         Envelope                                                                                                   d'exécution                                                                                                                                                                                                            1
                                                                                                                                                                                              e) - Avec compéti
r de l'Hôtel du Gouvernemen                         t Level
                                                                                                                                                                                              tion
t
                                                                                                                                                                                              Demande de cota
 ZR-COREF-378941-CW-RFQ /
                                                    Component 3. Project and C                                                                                                                tions - DTPM Petit
Petits travaux de rafraîchisse                                                                                                        Single Stage - One                                                                                         En attente                                                                                                                                                                                                         2024-05-1
                                  IDA / 70200       hange Management, and E      A posteriori    Demande de prix    Limited                                                                   s travaux (urgenc    125,000.00           0.00                                                                                                2023-09-25                                                                                    2023-11-20
ment des murs (peinture, éta                                                                                                          Envelope                                                                                                   d'exécution                                                                                                                                                                                                            8
                                                    mergency Response                                                                                                                         e) - Avec compéti
nchéité) des bureaux de la C
                                                                                                                                                                                              tion
SPP



GOODS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                                Bid Evaluation Report
                                  Loan / Credit N                                                                   Market Approac    Procurement Pr       Prequalification Estimated Am Actual Amount             Process St      Draft Pre-qualificatio      Prequalification Evalu   Draft Bidding Docum Specific Procurement            Bidding Documents a   Proposal Submission
       Description                                        Component                Review Type       Method                                                                                                                                                                                                                                                                             and Recommendatio         Signed Contract         Contract Completion
                                         o.                                                                                h              ocess                 (Y/N)        ount (US$)      (US$)                    atus            n Documents                  ation Report          ent / Justification Notice / Invitation                  s Issued        / Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                                             n for Award
                                                                                                                                                                                                                                   Planned         Actual      Planned      Actual      Planned       Actual      Planned       Actual      Planned      Actual   Planned      Actual    Planned     Actual     Planned       Actual      Planned       Actual

 ZR-COREF-265014-GO-DIR /
                                                    Component 3. Project and C
Acquisition d'un logiciel de g                                                                   Passation de mar
                                  IDA / 70200       hange Management, and E      A posteriori                       Direct                                                        50,000.00          46,473.00     Signé                                                                2021-12-20   2021-12-20   2021-12-25   2021-12-20                                                                       2022-01-27   2022-02-16   2022-03-28   2022-12-12
estion financière du projet E                                                                    ché de gré à gré
                                                    mergency Response
NCORE (auprès de TOMATE)


 ZR-COREF-265086-GO-DIR /
Marché de fourniture de Rec                         Component 1. Strengthenin
harge des Clés APN pour la r                        g Public Resources Manage                    Passation de mar
                                  IDA / 70200                                    A posteriori                       Direct                                                        20,000.00          20,000.00     Achevé                                                               2021-12-24   2022-01-25   2021-12-29   2022-01-21                                                                       2022-01-14   2022-01-30   2022-04-30   2022-05-07
emontée des informations de                         ment at Central Governmen                    ché de gré à gré
s 75 Administrations + l’équi                       t Level
pe technique de la FP (25)/ S
OCIETE RAAH SARL

 ZR-COREF-296509-GO-DIR /
Reconduction du contrat des
fournitures de recharge des                         Component 1. Strengthenin
clés APN pour la remontée d                         g Public Resources Manage                    Passation de mar
                                  IDA / 70200                                    A posteriori                       Direct                                                        15,000.00          15,000.00     Achevé                                                               2022-05-23   2022-05-23   2022-05-25   2022-05-23                                                                       2022-05-29   2022-06-03   2022-07-31   2022-07-10
es informations de 75 admini                        ment at Central Governmen                    ché de gré à gré
strations + l'équipe techniqu                       t Level
e de la FP (25) pour la périod
e de Mai à Juillet 2022 - Soci
été RAAH SARL

 ZR-COREF-296039-GO-RFQ /
                                                    Component 3. Project and C
Acquisition des laptops et ac                                                                                                         Single Stage - One
                                  IDA / V4000       hange Management, and E      A posteriori    Demande de prix    Limited                                                       49,000.00          46,270.00     Signé                                                                                          2022-06-09   2022-06-06                                                                       2022-07-05   2022-07-27   2022-08-05   2022-12-19
cessoires pour le personnel d                                                                                                         Envelope
                                                    mergency Response
u PPA du Projet ENCORE


 ZR-COREF-345208-GO-RFB /
Acquisition des équipements                         Component 1. Strengthenin
informatiques pour les 4 cent                       g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
                                  IDA / 70200                                    A posteriori    Appel d'offres     Open - National                                              600,000.00               0.00                                                                          2023-05-15                2023-05-20                                      2023-07-01            2023-07-31              2023-09-04                2024-03-02
res d'ordonnancement et po                          ment at Central Governmen                                                         Envelope                                                                     exécution
ur le renforcement du systè                         t Level
me d'information de la chaîn
e de la dépense

 ZR-COREF-345267-GO-RFQ /
Impression du manuel des pr                         Component 1. Strengthenin
océdures administratives et f                       g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
                                  IDA / 70200                                    A posteriori    Demande de prix    Limited                                                      100,000.00               0.00                                                                                                    2023-04-25                                                                                    2023-06-20                2023-12-17
inancières des DAF (2000 ex                         ment at Central Governmen                                                         Envelope                                                                     exécution
emplaires de 220 pages dont                         t Level
certaines pages en couleur)


 ZR-COREF-345306-GO-RFQ /                           Component 1. Strengthenin
Appui à la reproduction des                         g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
                                  IDA / 70200                                    A posteriori    Demande de prix    Limited                                                      100,000.00               0.00                                                                                                    2023-04-15                                                                                    2023-06-10                2023-12-07
manuels et textes règlement                         ment at Central Governmen                                                         Envelope                                                                     exécution
aires élaborés et validés                           t Level


 ZR-COREF-345326-GO-RFQ /                           Component 1. Strengthenin
                                                                                                                                      Single Stage - One                                                           En attente d'
Acquisition des équipements       IDA / 70200       g Public Resources Manage    A posteriori    Demande de prix    Limited                                                      100,000.00               0.00                                                                                                    2023-07-06                                                                                    2023-08-31                2024-02-27
                                                                                                                                      Envelope                                                                     exécution
informatiques des postes clé                        ment at Central Governmen
s de la DGTCP                                       t Level

 ZR-COREF-345327-GO-RFQ /                           Component 1. Strengthenin
                                                                                                                                      Single Stage - One                                                           En attente d'
Acquisition des mobiliers de      IDA / 70200       g Public Resources Manage    A posteriori    Demande de prix    Limited                                                       90,000.00               0.00                                                                                                    2023-07-27                                                                                    2023-09-21                2024-03-19
                                                                                                                                      Envelope                                                                     exécution
bureau des postes clés de la                        ment at Central Governmen
DGTCP                                               t Level

 ZR-COREF-345456-GO-RFQ /                           Component 1. Strengthenin
Acquisition des petites fourni                      g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
                                  IDA / 70200                                    A posteriori    Demande de prix    Limited                                                       50,000.00               0.00                                                                                                    2023-08-12                                                                                    2023-10-07                2024-04-04
tures de bureaux et consom                          ment at Central Governmen                                                         Envelope                                                                     exécution
mables en faveur des postes                         t Level
clés de la DGTCP

 ZR-COREF-345460-GO-RFB /                           Component 1. Strengthenin
                                                                                                                                      Single Stage - One                                                           En attente d'
Acquisition d'une solution inf    IDA / 70200       g Public Resources Manage    A posteriori    Appel d'offres     Open - National                                            1,200,000.00               0.00                                                                          2023-07-15                2023-07-20                                      2023-08-31            2023-09-30              2023-11-04                2024-05-02
                                                                                                                                      Envelope                                                                     exécution
ormatique du CUT                                    ment at Central Governmen
                                                    t Level

 ZR-COREF-345512-GO-RFQ /                           Component 1. Strengthenin
Acquisition de 100 machines                         g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
                                  IDA / 70200                                    A posteriori    Demande de prix    Limited                                                      200,000.00               0.00                                                                                                    2023-05-04                                                                                    2023-06-29                2023-12-26
d'impression des cartes des                         ment at Central Governmen                                                         Envelope                                                                     exécution
agents de carrières de servic                       t Level
es publics de l'Etat

 ZR-COREF-345539-GO-RFQ /
Acquisition des matériels inf
                                                    Component 1. Strengthenin
ormatiques pour le déploiem
                                                    g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
ent du SIGMAP dans 20 CGP     IDA / 70200                                        A posteriori    Demande de prix    Limited                                                      150,000.00               0.00                                                                                                    2023-06-20                                                                                    2023-08-15                2024-02-11
                                                    ment at Central Governmen                                                         Envelope                                                                     exécution
MPs additionnelles au niveau
                                                    t Level
central, la DGCMP ainsi que l
a salle machine SIGMAP au M
in du Budget.

 ZR-COREF-345540-GO-RFQ /                           Component 1. Strengthenin
Acquisition des mobiliers de                        g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
                                  IDA / 70200                                    A posteriori    Demande de prix    Limited                                                       30,000.00               0.00                                                                                                    2023-06-25                                                                                    2023-08-20                2024-02-16
bureau pour la salle de mach                        ment at Central Governmen                                                         Envelope                                                                     exécution
ine SIGMAP au Budget.                               t Level


 ZR-COREF-345544-GO-RFQ /
Abonnement internet de la C                         Component 1. Strengthenin
our des comptes pour la publ                        g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
                                  IDA / 70200                                    A posteriori    Demande de prix    Limited                                                       35,000.00               0.00                                                                                                    2023-04-11                                                                                    2023-06-06                2023-12-03
ication notamment des rapp                          ment at Central Governmen                                                         Envelope                                                                     exécution
orts de reddition des compte                        t Level
s du pouvoir central et des p
rovinces couvertes par le pro
jet
 ZR-COREF-345548-GO-RFQ /
                                                    Component 1. Strengthenin
Appui à la reproduction des
                                                    g Public Resources Manage                                                         Single Stage - One                                                           En attente d'
textes fixant les modalités d     IDA / 70200                                    A posteriori    Demande de prix    Limited                                                       30,000.00               0.00                                                                                                    2023-05-11                                                                                    2023-07-06                2024-01-02
                                                    ment at Central Governmen                                                         Envelope                                                                     exécution
e répartition des impôts et ta
                                                    t Level
xes d’intérêt commun




                                                                                                                                                                                                                                        Page 1
 ZR-COREF-345582-GO-RFQ /
Acquisition des desktops et a                   Component 3. Project and C
                                                                                                                                       Single Stage - One                         En attente d'
ccessoires pour le personnel      IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                       60,000.00    0.00                                                      2023-04-20                                                                    2023-06-15   2023-12-12
                                                                                                                                       Envelope                                   exécution
du Projet ENCORE (Coordina                      mergency Response
tion nationale et coordinatio
ns provinciales)

 ZR-COREF-345591-GO-RFQ /
Acquisition des imprimantes                     Component 3. Project and C
                                                                                                                                       Single Stage - One                         En attente d'
et appareils de reprographie      IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                       60,000.00    0.00                                                      2023-04-22                                                                    2023-06-17   2023-12-14
                                                                                                                                       Envelope                                   exécution
pour le Projet ENCORE (Coor                     mergency Response
dination nationale et coordin
ations provinciales)

 ZR-COREF-345620-GO-RFQ /                       Component 3. Project and C
                                                                                                                                       Single Stage - One                         En attente d'
Production d'un nouveau pa        IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                         2,000.00   0.00                                                      2023-04-04                                                                    2023-05-30   2023-11-26
                                                                                                                                       Envelope                                   exécution
nneau ENCORE                                    mergency Response


 ZR-COREF-345703-GO-DIR /                       Component 1. Strengthenin
                                                                                             Passation de mar                                                                     En attente d'
Rechargement des Clés APN         IDA / 70200   g Public Resources Manage     A posteriori                      Direct - National                             60,000.00    0.00                            2023-03-20                2023-03-25                                                                    2023-04-29   2024-04-28
                                                                                             ché de gré à gré                                                                     exécution
pour 75 postes                                  ment at Central Governmen
                                                t Level

 ZR-COREF-345707-GO-RFQ /
                                                Component 3. Project and C
Reproduction des documents                                                                                                             Single Stage - One                         En attente d'
                                  IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                       50,000.00    0.00                                                      2023-05-18                                                                    2023-07-13   2024-01-09
stratégiques sur les réformes                                                                                                          Envelope                                   exécution
                                                mergency Response
des finances publiques


 ZR-COREF-345708-GO-RFQ /
                                                Component 3. Project and C
Reproduction de la revue tri                                                                                                           Single Stage - One                         En attente d'
                                  IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                       40,000.00    0.00                                                      2023-04-20                                                                    2023-06-15   2023-12-12
mestrielle sur la réforme des                                                                                                          Envelope                                   exécution
                                                mergency Response
finances publiques


ZR-COREF-345711-GO-RFQ /                        Component 3. Project and C
                                                                                                                                       Single Stage - One                         En attente d'
Reproduction des agendas 2        IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                       40,000.00    0.00                                                      2023-04-01                                                                    2023-05-27   2023-11-23
                                                                                                                                       Envelope                                   exécution
023 pour le Projet ENCORE                       mergency Response


 ZR-COREF-345478-GO-RFQ /                       Component 1. Strengthenin
                                                                                                                                       Single Stage - One                         En attente d'
Mise aux normes de sécurisa       IDA / 70200   g Public Resources Manage     A posteriori   Demande de prix    Limited                                       60,000.00    0.00                                                      2023-08-12                                                                    2023-10-07   2024-04-04
                                                                                                                                       Envelope                                   exécution
tion du Data Center de secou                    ment at Central Governmen
rs                                              t Level

 ZR-COREF-345288-GO-RFB /                       Component 1. Strengthenin
Acquisition des fournitures d                   g Public Resources Manage                                                              Single Stage - One                         En attente d'
                                  IDA / 70200                                 A posteriori   Appel d'offres     Open - National                              600,000.00    0.00                            2023-08-07                2023-08-12                2023-09-23                2023-10-23                2023-11-27   2024-05-25
e bureau et consommables p                      ment at Central Governmen                                                              Envelope                                   exécution
our les 12 nouvelles DAF à in                   t Level
staller

 ZR-COREF-345249-GO-RFQ /
                                                Component 1. Strengthenin
Achat des mobiliers de burea
                                                g Public Resources Manage                                                              Single Stage - One                         En attente d'
u pour les 4 centres d'ordonn     IDA / 70200                                 A posteriori   Demande de prix    Limited                                      320,000.00    0.00                                                      2023-04-19                                                                    2023-06-14   2023-12-11
                                                ment at Central Governmen                                                              Envelope                                   exécution
ancement des ministères de
                                                t Level
l’EPST, Santé, Développeme
nt rural et des ITPR.

 ZR-COREF-345272-GO-RFB /
Acquisition des matériels et
mobiliers de bureau pour les                    Component 1. Strengthenin
12 nouvelles DAF (Affaires ét                   g Public Resources Manage                                                              Single Stage - One                         En attente d'
                                  IDA / 70200                                 A posteriori   Appel d'offres     Open - National                             1,000,000.00   0.00                            2023-04-10                2023-04-15                2023-05-20                2023-06-10                2023-07-15   2024-01-11
rangères, Coopération intern                    ment at Central Governmen                                                              Envelope                                   exécution
ational, Coopération régional                   t Level
e, Economie, Energie, Hydro
carbures, Jeunesse, Mines, P
ME et artisanat, PTNTIC, Spor
ts et loisirs, Justice)
 ZR-COREF-345320-GO-RFQ /
Acquisition des équipements
                                                Component 1. Strengthenin
informatiques et petites four
                                                g Public Resources Manage                                                              Single Stage - One                         En attente d'
nitures pour l'opérationnalisa    IDA / 70200                                 A posteriori   Demande de prix    Limited                                      200,000.00    0.00                                                      2023-07-20                                                                    2023-09-14   2024-03-12
                                                ment at Central Governmen                                                              Envelope                                   exécution
tion de l'ACCT, de postes co
                                                t Level
mptables des 4 ministères d
éconcentrés (EPST, Santé, IT
PR et Développement Rural)

 ZR-COREF-345705-GO-DIR /
Appui à la migration du SIGM                    Component 1. Strengthenin
AP vers un hébergeur sécuris                    g Public Resources Manage                    Passation de mar   Direct - Internation
                                  IDA / 70200                                 A posteriori                                                                    15,000.00    0.00   Annulé                   2023-07-25                2023-07-30                                                                    2023-09-03   2024-03-01
é, (frais d'hébergement) et                     ment at Central Governmen                    ché de gré à gré   al
Abonnement annuel de l'héb                      t Level
ergement du SIGMAP avec l'
entreprise GODADDY

 ZR-COREF-363973-GO-DIR /
Appui à la migration du SIGM                    Component 1. Strengthenin
AP vers un hébergeur sécuris                    g Public Resources Manage                    Passation de mar                                                                     En cours d'e
                                  IDA / 70200                                 A posteriori                      Direct - National                             15,000.00    0.00                            2023-05-30   2023-05-31   2023-06-04   2023-06-01                                                       2023-07-09   2024-01-05
é (frais d'hebergement) et a                    ment at Central Governmen                    ché de gré à gré                                                                     xécution
bonnement annuel de l'hebe                      t Level
rgement du SIGMAP avec l'e
ntreprise ITIK

 ZR-COREF-362725-GO-RFQ /
Acquisition de 2 véhicules 4X
                                                Component 2. Supporting
4 pour faciliter le déploiemen
                                                Resource Management at th                                                              Single Stage - One                         En attente d'
t des équipes de recenseme     IDA / 70200                                    A posteriori   Demande de prix    Limited                                      160,000.00    0.00                                                      2023-07-06                                                                    2023-08-31   2024-02-27
                                                e Provincial Government Lev                                                            Envelope                                   exécution
nt et de collecte des donnée
                                                el
s à Kinshasa et dans les 4 pr
ovinces du Kasaï, Kasaï Centr
al, Kasaï Oriental et Lomami

 ZR-COREF-345281-GO-RFB /
Acquisition des matériels inf
ormatiques pour les 12 nouv                     Component 1. Strengthenin
elles DAF, (Affaires étrangère                  g Public Resources Manage                                       Open - Internationa    Single Stage - One                         En cours d'e
                               IDA / 70200                                    A priori       Appel d'offres                                                 2,200,000.00   0.00                            2023-04-10   2023-07-19   2023-04-15   2023-08-07   2023-05-27   2023-09-20   2023-06-26   2023-11-13   2023-07-31   2024-01-27
s, Coopération international,                   ment at Central Governmen                                       l                      Envelope                                   xécution
Coopération régionale, Econ                     t Level
omie, Energie, Hydrocarbure
s, Jeunesse, Mines, PME et ar
tisanat, PTNTIC, Sports et loi
sirs, Justice)
 ZR-COREF-362723-GO-RFQ /
                                                Component 3. Project and C
Acquisition de 6 véhicules 4X                                                                                                          Single Stage - One                         En attente d'
                               IDA / 70200      hange Management, and E       A posteriori   Demande de prix    Limited                                      480,000.00    0.00                                                      2023-07-06                                                                    2023-08-31   2024-02-27
4 dont 2 pour la coordination                                                                                                          Envelope                                   exécution
                                                mergency Response
nationale et 4 pour les coordi
nations provinciales

 ZR-COREF-371832-GO-RFQ /                       Component 1. Strengthenin
                                                                                                                                       Single Stage - One                         En attente d'
Acquisition de 80 lecteurs d'     IDA / 70200   g Public Resources Manage     A posteriori   Demande de prix    Limited                                      100,000.00    0.00                                                      2023-07-25                                                                    2023-09-19   2024-03-17
                                                                                                                                       Envelope                                   exécution
empreintes pour identificatio                   ment at Central Governmen
n biométrique                                   t Level

 ZR-COREF-371834-GO-RFQ /                       Component 1. Strengthenin
Acquisition des mobiliers de                    g Public Resources Manage                                                              Single Stage - One                         En attente d'
                                  IDA / 70200                                 A posteriori   Appel d'offres     Open - National                              350,000.00    0.00                            2023-09-18                2023-09-23                2023-11-04                2023-12-04                2024-01-08   2024-07-06
bureau pour les 6 directions                    ment at Central Governmen                                                              Envelope                                   exécution
de la DGRH réhabilitées                         t Level


 ZR-COREF-371825-GO-RFQ /                       Component 1. Strengthenin
Impression du Rapport ITIE-R                    g Public Resources Manage                                                              Single Stage - One                         En attente d'
                                  IDA / 70200                                 A posteriori   Demande de prix    Limited                                       80,000.00    0.00                                                      2023-09-18                                                                    2023-11-13   2024-05-11
DC, Exercices 2020 et 2021                      ment at Central Governmen                                                              Envelope                                   exécution
pour la Dissémination                           t Level


 ZR-COREF-371830-GO-RFQ /
                                                Component 1. Strengthenin
Acquisition de 40 machines s
                                                g Public Resources Manage                                                              Single Stage - One                         En attente d'
canners pour la numérisation      IDA / 70200                                 A posteriori   Appel d'offres     Open - National                              250,000.00    0.00                            2023-09-29                2023-10-04                2023-11-15                2023-12-15                2024-01-19   2024-07-17
                                                ment at Central Governmen                                                              Envelope                                   exécution
des actes administratifs de f
                                                t Level
onctionnaires en provinces e
t au niveau central

 ZR-COREF-378587-GO-RFB /
                                                Component 1. Strengthenin
Acquisition de 40 machines s
                                                g Public Resources Manage                                                              Single Stage - One                         En attente d'
canners pour la numérisation      IDA / 70200                                 A posteriori   Appel d'offres     Open - National                              250,000.00    0.00                            2023-09-08                2023-09-13                2023-10-25                2023-11-24                2023-12-29   2024-06-26
                                                ment at Central Governmen                                                              Envelope                                   exécution
des actes administratifs de f
                                                t Level
onctionnaires en provinces e
t au niveau central

 ZR-COREF-378588-GO-DIR /                       Component 1. Strengthenin
Renouvellement de l'abonne                      g Public Resources Manage                    Passation de mar   Direct - Internation                                              En cours d'e
                                  IDA / 70200                                 A posteriori                                                                    60,000.00    0.00                            2023-08-30   2023-10-19   2023-09-04                                                                    2023-10-09   2024-04-06
ment des services du cloud p                    ment at Central Governmen                    ché de gré à gré   al                                                                xécution
our le FRAP avec la firme ora                   t Level
cle

 ZR-COREF-378688-GO-RFQ /                       Component 3. Project and C
                                                                                                                                       Single Stage - One                         En attente d'
Installation de la fibre optiqu   IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                       50,000.00    0.00                                                      2023-09-20                                                                    2023-11-15   2024-05-13
                                                                                                                                       Envelope                                   exécution
e pour la Connexion internet                    mergency Response


 ZR-COREF-378693-GO-RFQ /                       Component 3. Project and C
                                                                                                                                       Single Stage - One
Acquisition d'un logiciel GED     IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                       50,000.00    0.00   Annulé                                             2023-10-07                                                                    2023-12-02   2024-05-30
                                                                                                                                       Envelope
pour le projet ENCORE                           mergency Response


 ZR-COREF-378703-GO-RFQ /
                                                Component 3. Project and C
Acquisition de 2 véhicules po                                                                                                          Single Stage - One                         En attente d'
                                  IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                      160,000.00    0.00                                                      2023-09-20                                                                    2023-11-15   2024-05-13
ur la coordonnatrice et les co                                                                                                         Envelope                                   exécution
                                                mergency Response
urses de service de la CSPP


 ZR-COREF-378704-GO-RFQ /                       Component 3. Project and C
                                                                                                                                       Single Stage - One                         En attente d'
Acquisition des mobiliers de      IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited                                       40,000.00    0.00                                                      2023-10-14                                                                    2023-12-09   2024-06-06
                                                                                                                                       Envelope                                   exécution
bureau de la CSSP                               mergency Response




                                                                                                                                                                                                  Page 2
 ZR-COREF-378705-GO-RFQ /                        Component 3. Project and C
                                                                                                                                  Single Stage - One                         En attente d'
Acquisition des matériels inf      IDA / 70200   hange Management, and E       A posteriori   Demande de prix   Limited                                  70,000.00    0.00                                                      2023-10-14                                                                    2023-12-09   2024-06-06
                                                                                                                                  Envelope                                   exécution
ormatiques et de reprograph                      mergency Response
ie de la CSPP

 ZR-COREF-378875-GO-RFQ /                        Component 1. Strengthenin
Acquisition d'un scanner gro                     g Public Resources Manage                                                        Single Stage - One                         En attente d'
                                   IDA / 70200                                 A posteriori   Demande de prix   Limited                                    6,000.00   0.00                                                      2023-10-08                                                                    2023-12-03   2024-05-31
s format pour scanner les ra                     ment at Central Governmen                                                        Envelope                                   exécution
pports à publier en faveur de                    t Level
la cour des comptes

ZR-COREF-378943-GO-RFQ /                         Component 1. Strengthenin
                                                                                                                                  Single Stage - One                         En attente d'
Acquisition de 4 véhicules 4x      IDA / 70200   g Public Resources Manage     A posteriori   Demande de prix   Limited                                 320,000.00    0.00                                                      2023-10-07                                                                    2023-12-02   2024-05-30
                                                                                                                                  Envelope                                   exécution
4 pour les postes clés de la D                   ment at Central Governmen
GTCP                                             t Level

 ZR-COREF-378994-GO-RFQ /                        Component 1. Strengthenin
Reproduction du rapport con                      g Public Resources Manage                                                        Single Stage - One                         En attente d'
                                   IDA / 70200                                 A posteriori   Demande de prix   Limited                                 100,000.00    0.00                                                      2023-10-23                                                                    2023-12-18   2024-06-15
solidé de la situation financiè                  ment at Central Governmen                                                        Envelope                                   exécution
re des entreprises publiques                     t Level


 ZR-COREF-379067-GO-RFB /                        Component 1. Strengthenin
Acquisition des équipements                      g Public Resources Manage                                                        Single Stage - One                         En cours d'e
                                   IDA / 70200                                 A priori       Appel d'offres    Open - National                        2,000,000.00   0.00                            2023-09-25   2023-11-08   2023-09-30   2023-11-16   2023-11-11   2023-12-22   2023-12-11                2024-01-15   2024-07-13
informatiques complémentai                       ment at Central Governmen                                                        Envelope                                   xamen
res de la DGTCP                                  t Level


 ZR-COREF-379069-GO-RFB /                        Component 1. Strengthenin
                                                                                                                                  Single Stage - One                         En cours d'e
Acquisition des mobiliers de       IDA / 70200   g Public Resources Manage     A posteriori   Appel d'offres    Open - National                        1,500,000.00   0.00                            2023-09-26   2023-10-09   2023-10-01   2024-04-03   2023-11-12                2023-12-12                2024-01-16   2024-07-14
                                                                                                                                  Envelope                                   xécution
bureau de la DGTCP                               ment at Central Governmen
                                                 t Level

 ZR-COREF-379076-GO-RFB /                        Component 1. Strengthenin
Acquisition des petites fourni                   g Public Resources Manage                                                        Single Stage - One                         En attente d'
                                   IDA / 70200                                 A posteriori   Appel d'offres    Open - National                         500,000.00    0.00                            2023-10-30                2023-11-06                2023-12-18                2024-01-17                2024-02-21   2024-08-19
tures de bureaux et consom                       ment at Central Governmen                                                        Envelope                                   exécution
mables complémentaire en f                       t Level
aveur de la DGTCP

 ZR-COREF-379121-GO-RFB /
Acquisition des équipements                      Component 1. Strengthenin
informatiques complémentai                       g Public Resources Manage                                                        Single Stage - One                         En attente d'
                              IDA / 70200                                      A posteriori   Appel d'offres    Open - National                         600,000.00    0.00                            2023-10-13                2023-10-18                2023-11-29                2023-12-29                2024-02-02   2024-07-31
res et consommables inform                       ment at Central Governmen                                                        Envelope                                   exécution
atiques pour les 20 CGPMPs                       t Level
additionnelles au niveau cent
ral, la DGCMP

 ZR-COREF-379122-GO-RFB /
Acquisition des matériels et                     Component 2. Supporting
consommables informatique                        Resource Management at th                                                        Single Stage - One                         En cours d'e
                                   IDA / 70200                                 A posteriori   Appel d'offres    Open - National                        1,000,000.00   0.00                            2023-10-13   2023-10-02   2023-10-18   2023-11-17   2023-11-29                2023-12-29                2024-02-02   2024-07-31
s en faveur des administratio                    e Provincial Government Lev                                                      Envelope                                   xécution
ns fiscales Provinciales du Ka                   el
saï Oriental, du Kasaï, du Kas
aï Central et de Lomami

 ZR-COREF-379123-GO-RFB /
Acquisition des mobiliers de                     Component 2. Supporting
bureaux en faveur des admin                      Resource Management at th                                                        Single Stage - One                         En attente d'
                                IDA / 70200                                    A posteriori   Appel d'offres    Open - National                        1,000,000.00   0.00                            2023-10-05                2023-10-10                2023-11-21                2023-12-21                2024-01-25   2024-07-23
istrations fiscales Provinciale                  e Provincial Government Lev                                                      Envelope                                   exécution
s du Kasaï Oriental, du Kasaï,                   el
du Kasaï Central et de Loma
mi

 ZR-COREF-379124-GO-RFB /
                                                 Component 2. Supporting
Acquisition des fournitures d
                                                 Resource Management at th                                                        Single Stage - One                         En cours d'e
es bureaux pour les régies pr      IDA / 70200                                 A posteriori   Appel d'offres    Open - National                         800,000.00    0.00                            2023-10-06   2024-03-11   2023-10-11   2024-03-26   2023-11-22                2023-12-22                2024-01-26   2024-07-24
                                                 e Provincial Government Lev                                                      Envelope                                   xécution
ovinciales du Kasaï Oriental,
                                                 el
du Kasaï, du Kasaï Central et
de Lomami

 ZR-COREF-379125-GO-RFB /
Acquisition des matériels et
                                                 Component 2. Supporting
consommables informatique
                                                 Resource Management at th                                                        Single Stage - One                         En attente d'
s en faveur des Services inte IDA / 70200                                      A posteriori   Appel d'offres    Open - National                         500,000.00    0.00                            2023-09-25                2023-09-30                2023-11-11                2023-12-11                2024-01-15   2024-07-13
                                                 e Provincial Government Lev                                                      Envelope                                   exécution
rvenant dans la chaîne de la
                                                 el
dépense du Kasaï Oriental, d
u Kasaï, du Kasaï Central et d
e Lomami

 ZR-COREF-379126-GO-RFB /
Acquisition des mobiliers de                     Component 2. Supporting
bureaux en faveur des Servic                     Resource Management at th                                                        Single Stage - One                         En attente d'
                                   IDA / 70200                                 A posteriori   Appel d'offres    Open - National                         500,000.00    0.00                            2023-09-26                2023-10-01                2023-11-12                2023-12-12                2024-01-16   2024-07-14
es intervenant dans la chaîn                     e Provincial Government Lev                                                      Envelope                                   exécution
e de la dépense du Kasaï Ori                     el
ental, du Kasaï, du Kasaï Cen
tral et de Lomami

 ZR-COREF-379127-GO-RFB /
Acquisition des fournitures d                    Component 2. Supporting
e bureaux en faveur des Ser                      Resource Management at th                                                        Single Stage - One                         En attente d'
                                   IDA / 70200                                 A posteriori   Appel d'offres    Open - National                         300,000.00    0.00                            2023-09-28                2023-10-03                2023-11-14                2023-12-14                2024-01-18   2024-07-16
vices intervenant dans la cha                    e Provincial Government Lev                                                      Envelope                                   exécution
îne de la dépense du Kasaï O                     el
riental, du Kasaï, du Kasaï Ce
ntral et de Lomami

 ZR-COREF-379128-GO-RFB /
Acquisition de 400 motos po                      Component 2. Supporting
ur les régies financières prov                   Resource Management at th                                                        Single Stage - One                         En cours d'e
                                   IDA / 70200                                 A priori       Appel d'offres    Open - National                        2,000,000.00   0.00                            2023-09-29   2023-10-27   2023-10-04   2023-10-30   2023-11-15   2023-12-04   2023-12-15   2024-02-19   2024-01-19   2024-07-17
inciales du Kasaï Oriental, Ka                   e Provincial Government Lev                                                      Envelope                                   xécution
saï Central, Kasaï et Lomami                     el
(à raison de 100 par provinc
e)

 ZR-COREF-379130-GO-RFB /
Acquisition des Mobiliers de                     Component 3. Project and C
                                                                                                                                  Single Stage - One                         En attente d'
bureau pour la Coordination        IDA / 70200   hange Management, and E       A posteriori   Appel d'offres    Open - National                         350,000.00    0.00                            2023-09-18                2023-09-23                2023-11-04                2023-12-04                2024-01-08   2024-07-06
                                                                                                                                  Envelope                                   exécution
nationale et les coordination                    mergency Response
s provinciales du Projet ENC
ORE

 ZR-COREF-379131-GO-RFB /                        Component 3. Project and C
                                                                                                                                  Single Stage - One                         En attente d'
Acquisition des matériels, log     IDA / 70200   hange Management, and E       A posteriori   Appel d'offres    Open - National                         300,000.00    0.00                            2023-10-09                2023-10-14                2023-11-25                2023-12-25                2024-01-29   2024-07-27
                                                                                                                                  Envelope                                   exécution
iciels et installation d'un rése                 mergency Response
au local mixte

 ZR-COREF-362720-GO-RFB /
Fourniture, installation et la
mise en marche du datacent                       Component 2. Supporting
er de secours au bâtiment ad                     Resource Management at th                                                        Single Stage - One
                                   IDA / 70200                                 A posteriori   Appel d'offres    Open - National                         216,000.00    0.00   Annulé                   2023-07-03                2023-07-08                2023-08-19                2023-09-18                2023-10-23   2024-04-20
ministratif de la fonction pub                   e Provincial Government Lev                                                      Envelope
lique du système intégré de                      el
gestion des ressources huma
ines et de la paie de l'admini
stration publique

 ZR-COREF-345479-GO-RFQ /
                                                 Component 1. Strengthenin
Acquisition de 40 machines s
                                                 g Public Resources Manage                                                        Single Stage - One
canners pour la numérisation       IDA / 70200                                 A posteriori   Demande de prix   Limited                                  48,000.00    0.00   Annulé                                             2023-04-20                                                                    2023-06-15   2023-12-12
                                                 ment at Central Governmen                                                        Envelope
des actes administratifs de f
                                                 t Level
onctionnaires en provinces e
t au niveau central

 ZR-COREF-345482-GO-RFQ /                        Component 1. Strengthenin
                                                                                                                                  Single Stage - One
Acquisition des 80 lecteurs d'     IDA / 70200   g Public Resources Manage     A posteriori   Demande de prix   Limited                                  12,000.00    0.00   Annulé                                             2023-04-06                                                                    2023-06-01   2023-11-28
                                                                                                                                  Envelope
empreintes pour identificatio                    ment at Central Governmen
n biométrique                                    t Level

 ZR-COREF-345551-GO-RFQ /
Acquisition des matériels inf                    Component 2. Supporting
ormatiques en faveur des ad                      Resource Management at th                                                        Single Stage - One
                                   IDA / 70200                                 A posteriori   Demande de prix   Limited                                 250,000.00    0.00   Annulé                                             2023-06-28                                                                    2023-08-23   2024-02-19
ministrations fiscales Provinc                   e Provincial Government Lev                                                      Envelope
iales du Kasaï Oriental, du Ka                   el
saï, du Kasaï Central et de Lo
mami

 ZR-COREF-345556-GO-RFQ /
Acquisition des mobiliers des                    Component 2. Supporting
bureaux en faveur des admin                      Resource Management at th                                                        Single Stage - One
                                IDA / 70200                                    A posteriori   Demande de prix   Limited                                 250,000.00    0.00   Annulé                                             2023-06-25                                                                    2023-08-20   2024-02-16
istrations fiscales Provinciale                  e Provincial Government Lev                                                      Envelope
s du Kasaï Oriental, du Kasaï                    el
, du Kasaï Central et de Lom
ami

 ZR-COREF-345557-GO-RFQ /
Acquisition des fournitures d                    Component 2. Supporting
es bureaux et consommables                       Resource Management at th                                                        Single Stage - One
                               IDA / 70200                                     A posteriori   Demande de prix   Limited                                 110,000.00    0.00   Annulé                                             2023-07-20                                                                    2023-09-14   2024-03-12
informatiques pour les régies                    e Provincial Government Lev                                                      Envelope
provinciales du Kasaï Orient                     el
al, du Kasaï, du Kasaï Central
et de Lomami

 ZR-COREF-345473-GO-RFQ /                        Component 1. Strengthenin
                                                                                                                                  Single Stage - One
Acquisition des mobiliers pou      IDA / 70200   g Public Resources Manage     A posteriori   Demande de prix   Limited                                 200,000.00    0.00   Annulé                                             2023-04-10                                                                    2023-06-05   2023-12-02
                                                                                                                                  Envelope
r les 6 directions de la DGRH                    ment at Central Governmen
réhabilitées                                     t Level

 ZR-COREF-264864-GO-RFQ /
                                                 Component 1. Strengthenin
Acquisition et déploiement d
                                                 g Public Resources Manage                                                        Single Stage - One
es matériels auprès des utilis     /                                           A posteriori   Demande de prix   Limited                                  40,000.00    0.00   Annulé                                             2022-01-15                                                                    2022-02-25   2022-04-26
                                                 ment at Central Governmen                                                        Envelope
ateurs de SIGMAP dans 20 n
                                                 t Level
ouveaux cellules identifiées




                                                                                                                                                                                             Page 3
 ZR-COREF-296208-GO-RFQ /                        Component 1. Strengthenin
Marché de fourniture de mob                      g Public Resources Manage                                                            Single Stage - One
                                   IDA / V4000                                 A posteriori   Demande de prix    Limited                                     70,000.00    0.00   Annulé                                             2022-06-22                                          2022-07-22   2022-08-21
ilier de bureaux pour équiper                    ment at Central Governmen                                                            Envelope
les nouveaux locaux de la D                      t Level
GRH-DBDR

 ZR-COREF-378682-GO-RFQ /
Acquisition des matériels inf
                                                 Component 3. Project and C
ormatiques et matériels de r                                                                                                          Single Stage - One                         En attente d'
                                   IDA / 70200   hange Management, and E       A posteriori   Appel d'offres     Open - National                            200,000.00    0.00                            2023-10-10                2023-10-15                2023-11-26   2023-12-10   2024-01-14   2024-07-12
eprographie complémentaire                                                                                                            Envelope                                   exécution
                                                 mergency Response
s de la Coordination national
e et les coordinations provin
ciales du Projet ENCORE

 ZR-COREF-379120-GO-DIR /
                                                 Component 2. Supporting
Production et Impression des
                                                 Resource Management at th                    Passation de mar                                                                   En attente d'
annuaires alphabétiques et n       IDA / 70200                                 A posteriori                      Direct - National                          350,000.00    0.00                            2023-10-05                2023-10-10                                          2023-11-14   2024-05-12
                                                 e Provincial Government Lev                  ché de gré à gré                                                                   exécution
umériques de tous les agent
                                                 el
s de carrière certifiés régulie
rs dans le fichier FRAP

 ZR-COREF-409335-GO-RFB /                        Component 1. Strengthenin
Acquisition des matériels inf                    g Public Resources Manage                                                            Single Stage - One                         En cours d'e
                                   IDA / 70200                                 A priori       Appel d'offres     Open - National                           2,400,000.00   0.00                            2024-03-10   2024-03-17   2024-03-10   2024-03-20   2024-05-19   2024-06-18   2024-07-23   2026-01-14
ormatique au profit des servi                    ment at Central Governmen                                                            Envelope                                   xécution
ces d'assiettes pour l'utilisati                 t Level
on du LOGIRAD

 ZR-COREF-410269-GO-RFQ /                        Component 1. Strengthenin
                                                                                                                                      Single Stage - One                         En attente d'
Acquisition de petites fournit     IDA / 70200   g Public Resources Manage     A posteriori   Demande de prix    Limited - National                          50,000.00    0.00                                                      2024-02-23                                          2024-03-24   2024-04-23
                                                                                                                                      Envelope                                   exécution
ures pour le CSP                                 ment at Central Governmen
                                                 t Level

 ZR-COREF-410273-GO-RFQ /                        Component 1. Strengthenin
Acquisition des matériels inf                    g Public Resources Manage                                                            Single Stage - One                         En attente d'
                                   IDA / 70200                                 A posteriori   Demande de prix    Limited - National                         350,000.00    0.00                                                      2024-02-23                                          2024-03-28   2024-04-27
ormatiques et consommable                        ment at Central Governmen                                                            Envelope                                   exécution
s pour le Conseil Supérieur d                    t Level
u Porte feuille CSP

 ZR-COREF-378590-GO-RFQ /
Acquisition de 5 Groupes éle
                                                 Component 1. Strengthenin
ctrogènes dont quatre de 15
                                                 g Public Resources Manage                                                            Single Stage - One                         En attente d'
KVA pour les coordinations p       IDA / 70200                                 A posteriori   Demande de prix    Limited - National                         185,000.00    0.00                                                      2024-03-24                                          2024-05-12   2024-06-11
                                                 ment at Central Governmen                                                            Envelope                                   exécution
rovinciales (à raison 1 par pr
                                                 t Level
ovince) et un de 30 KVA pour
la salle machine SIGMAP au
Ministère de Budget

 ZR-COREF-410639-GO-RFQ /
Acquisition des matériels inf
                                                 Component 3. Project and C
ormatiques et matériels de r                                                                                                          Single Stage - One                         En attente d'
                                   IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited - National                         300,000.00    0.00                                                      2024-03-01                                          2024-04-19   2024-05-19
eprographie complémentaire                                                                                                            Envelope                                   exécution
                                                 mergency Response
s de la Coordination national
e et les coordinations provin
ciales du Projet ENCORE

 ZR-COREF-411790-GO-RFB /
Acquisition des Mobiliers de
                                                 Component 1. Strengthenin
bureau en deux lots distincts
                                                 g Public Resources Manage                                                            Single Stage - One                         En attente d'
:                                  IDA / 70200                                 A posteriori   Appel d'offres     Open - National                            600,000.00    0.00                            2024-03-17                2024-03-17                2024-05-26   2024-06-25   2024-07-30   2026-01-21
                                                 ment at Central Governmen                                                            Envelope                                   exécution
Lot 1 : Pour la Coordination n
                                                 t Level
ationale et coordinations pro
vinciales du Projet ENCORE
Lot 2 : Pour le CSP

 ZR-COREF-411792-GO-RFB /
Acquisition des équipements
                                                 Component 1. Strengthenin
informatiques (80 lecteurs d'
                                                 g Public Resources Manage                                                            Single Stage - One                         En attente d'
empreintes pour identificatio      IDA / 70200                                 A posteriori   Appel d'offres     Open - National                           1,300,000.00   0.00                            2024-03-24                2024-03-24                2024-06-02   2024-07-02   2024-08-06   2026-01-28
                                                 ment at Central Governmen                                                            Envelope                                   exécution
n biométrique et 80 machine
                                                 t Level
s d'impression des cartes) en
faveur de la Fonction Publiqu
e (DBDR)

 ZR-COREF-411793-GO-RFB /
Acquisition des fournitures d
e bureau en deux lots distinc
                                                 Component 1. Strengthenin
ts :
                                                 g Public Resources Manage                                                            Single Stage - One                         En attente d'
Lot 1 : Pour les 12 DAF des        IDA / 70200                                 A posteriori   Appel d'offres     Open - National                            800,000.00    0.00                            2024-03-24                2024-03-24                2024-06-02   2024-07-02   2024-08-06   2026-01-28
                                                 ment at Central Governmen                                                            Envelope                                   exécution
ministères de la 1ère vague (
                                                 t Level
Dév. rural, Agri., FP, Portefeu
ille, Envir, ITPR, EPSP, Plan, B
udget, Santé, Finances et Pri
mature)
Lot 2: Pour les 20 nouvel. C
 ZR-COREF-411795-GO-RFB /
GPMP
Acquisition des mobiliers de
bureau en trois lots distincts
:                                                Component 1. Strengthenin
Lot 1 : Pour les 4 nouv. centr                   g Public Resources Manage                                                            Single Stage - One
                                   IDA / 70200                                 A posteriori   Appel d'offres     Open - National                           1,420,000.00   0.00   Annulé                   2024-03-24                2024-03-24                2024-06-02   2024-07-02   2024-08-06   2026-01-28
es d'ord.                                        ment at Central Governmen                                                            Envelope
Lot 2 : Pour les 12 DAF des                      t Level
min de la 1ère vag.
Lot 3 : Pour les postes compt
ables des 4 min. expéri de la
déconc. de l'ordon (EPST, Sa
nté, ITPR et Dév
 ZR-COREF-411799-GO-RFB /
Production et Impression des
documents en deux lots disti
ncts :                                           Component 1. Strengthenin
Lot 1 : Manuel des procédure                     g Public Resources Manage                                                            Single Stage - One                         En attente d'
                                   IDA / 70200                                 A posteriori   Appel d'offres     Open - National                            450,000.00    0.00                            2024-04-14                2024-04-14                2024-06-23   2024-07-23   2024-08-27   2026-02-18
s administratives et financièr                   ment at Central Governmen                                                            Envelope                                   exécution
es des DAF                                       t Level
Lot 2 : Annuaires alphabétiq
ues et numériques de tous le
s agents de carrière certifiés
réguliers dans le fichier FRAP

 ZR-COREF-410616-GO-RFB /
Acquisition des équipements
informatiques et consommab
                                                 Component 1. Strengthenin
les en faveur des douze DAF
                                                 g Public Resources Manage                                                            Single Stage - One                         En cours d'e
des ministères de la 1ère va       IDA / 70200                                 A priori       Appel d'offres     Open - National                           2,060,000.00   0.00                            2024-03-24   2024-03-17   2024-03-24   2024-03-21   2024-06-02   2024-07-02   2024-08-06   2026-01-28
                                                 ment at Central Governmen                                                            Envelope                                   xécution
gue (Développement rural, A
                                                 t Level
griculture, Fonction Publique,
Portefeuille, Environnement,
ITPR, EPSP, Plan, Budget, Sa
nté, Finances et Primature)

 ZR-COREF-413852-GO-RFB /
Acquisition des mobiliers de                     Component 1. Strengthenin
bureau en deux lots distincts                    g Public Resources Manage                                                            Single Stage - Two                         En attente d'
                                   IDA / 70200                                 A posteriori   Appel d'offres     Open - National                           1,320,000.00   0.00                            2024-03-11                2024-04-10                2024-05-10   2024-07-08   2024-08-12   2026-02-03
: Lot 1 : Pour les 4 nouv. cent                  ment at Central Governmen                                                            Envelope                                   exécution
res d'ord. Lot 2 : Pour les 12                   t Level
DAF des min de la 1ère vagu
e

 ZR-COREF-413854-GO-RFB /                        Component 1. Strengthenin
Acquisition des matériels inf                    g Public Resources Manage                                                            Single Stage - Two                         En attente d'
                                   IDA / 70200                                 A posteriori   Appel d'offres     Open - National                           1,000,000.00   0.00                            2024-03-11                2024-04-01                2024-05-01   2024-07-14   2024-08-18   2026-02-09
ormatiques et consommable                        ment at Central Governmen                                                            Envelope                                   exécution
s en faveur des 20 nouvelles                     t Level
CGPMP

 ZR-COREF-413868-GO-RFB /
Acquisition des mobiliers de
bureau en deux lots distincts
                                                 Component 1. Strengthenin
:
                                                 g Public Resources Manage                                                            Single Stage - Two                         En attente d'
Lot1: Pour les 20 nouvelles C      IDA / 70200                                 A posteriori   Appel d'offres     Open - National                           1,100,000.00   0.00                            2024-03-30                2024-04-29                2024-05-29   2024-07-27   2024-08-31   2026-02-22
                                                 ment at Central Governmen                                                            Envelope                                   exécution
GPMP
                                                 t Level
Lot 2: Pour les postes compt
ables des 4 ministères expéri
mentaux de la déconcentrati
on de l'ordonnancement (EP
ST, Santé, ITPR, Dev. Rural
 ZR-COREF-414126-GO-RFB /
Acquisition des équipements
informatiques pour les 4 nou                     Component 1. Strengthenin
veaux centres d'ordonnance                       g Public Resources Manage                                                            Single Stage - One                         En cours d'e
                                   IDA / 70200                                 A posteriori   Appel d'offres     Open - National                            700,000.00    0.00                            2024-04-07   2024-03-20   2024-04-07   2024-04-03   2024-06-16   2024-07-16   2024-08-20   2026-02-11
ment et pour le renforcemen                      ment at Central Governmen                                                            Envelope                                   xécution
t du système d'information d                     t Level
e la chaîne de la dépense (E
SU, Défense, Agriculture, Pêc
he et Elevage)

 ZR-COREF-414130-GO-RFB /
Recrutement d'une firme po                       Component 1. Strengthenin
ur assurer la maintenance de                     g Public Resources Manage                                                            Single Stage - Two
                                   IDA / 70200                                 A priori       Appel d'offres     Open - National                            500,000.00    0.00   Annulé                   2024-04-21                2024-04-21                2024-06-30                2024-10-17   2026-04-10
s équipements déployés dan                       ment at Central Governmen                                                            Envelope
s 75 administrations et 10 pr                    t Level
ovinces dans le cadre du SG
RH-Paie

 ZR-COREF-414135-GO-RFQ /                        Component 1. Strengthenin
Acquisition du système élect                     g Public Resources Manage                                                            Single Stage - One                         En attente d'
                                   IDA / 70200                                 A posteriori   Demande de prix    Open - National                            350,000.00    0.00                                                      2024-04-07                                          2024-04-07   2024-04-07
ronique d'archivage des doss                     ment at Central Governmen                                                            Envelope                                   exécution
iers des marchés publics                         t Level


 ZR-COREF-414431-GO-RFQ /                        Component 3. Project and C
                                                                                                                                      Single Stage - One                         En attente d'
Acquisition des matériels, log     IDA / 70200   hange Management, and E       A posteriori   Demande de prix    Limited - National                         350,000.00    0.00                                                      2024-04-08                                          2024-05-30   2024-06-29
                                                                                                                                      Envelope                                   exécution
iciels et installation d'un rése                 mergency Response
au local mixte




                                                                                                                                                                                                 Page 4
 ZR-COREF-417544-GO-RFB /
Recrutement d'une firme po                          Component 1. Strengthenin
ur assurer la maintenance de                        g Public Resources Manage                                                                  Single Stage - One                                                         En attente d'
                                  IDA / 70200                                     A posteriori    Appel d'offres         Open - National                                                500,000.00                 0.00                                                                        2024-05-26                2024-05-26                                      2024-08-04                2024-09-03                2024-10-08                2026-04-01
s équipements déployés dan                          ment at Central Governmen                                                                  Envelope                                                                   exécution
s 75 administrations et 10 pr                       t Level
ovinces dans le cadre du SG
RH-Paie

 ZR-COREF-418187-GO-RFQ /
Acquisition des fournitures d
e bureaux et consommables                           Component 2. Supporting
informatiques en faveur des                         Resource Management at th                                                                  Single Stage - One                                                         En attente d'
                                  IDA / 70200                                     A posteriori    Demande de prix        Limited - National                                             300,000.00                 0.00                                                                                                  2024-04-28                                                                                          2024-04-28                2024-04-28
Services intervenant dans la                        e Provincial Government Lev                                                                Envelope                                                                   exécution
chaîne de la dépense du Kas                         el
aï Oriental, du Kasaï, du Kasa
ï Central et de Lomami (marc
hé en 2 lots)

 ZR-COREF-418254-GO-RFQ /                           Component 1. Strengthenin
Acquisition des mobiliers de                        g Public Resources Manage                                                                  Single Stage - One                                                         En attente d'
                                  IDA / 70200                                     A posteriori    Demande de prix        Limited - National                                             100,000.00                 0.00                                                                                                  2024-04-28                                                                                          2024-04-28                2024-04-28
bureau pour le Conseil Supér                        ment at Central Governmen                                                                  Envelope                                                                   exécution
ieur du Porte feuille (CSP)                         t Level


 ZR-COREF-414138-NC-RFQ /
Acquisition d'un logiciel de g
                                                    Component 3. Project and C
estion du PTBA et des compo                                                                                                                    Single Stage - One
                                  IDA / 70200       hange Management, and E       A posteriori    Demande de prix        Open - National                                                100,000.00                 0.00   Annulé                                                                                         2024-04-07                                                                                          2024-04-07                2024-04-07
santes de suivi et évaluation                                                                                                                  Envelope
                                                    mergency Response
du projet ENCORE, y compris
les PBC (conception, installat
ion et formation)

 ZR-COREF-421082-GO-RFQ /
                                                    Component 3. Project and C
Acquisition d'un groupe Elect                                                                                                                  Single Stage - One                                                         En attente d'
                                  IDA / 70200       hange Management, and E       A posteriori    Demande de prix        Limited - National                                              40,000.00                 0.00                                                                                                  2024-04-10                                                                                          2024-04-10                2024-04-10
rogène de 150 kva pour la co                                                                                                                   Envelope                                                                   exécution
                                                    mergency Response
ordination nationale du proje
t ENCORE

 ZR-COREF-414134-GO-RFB /                           Component 1. Strengthenin
Acquisition et déploiement d                        g Public Resources Manage                                            Open - Internationa   Single Stage - Two
                                  IDA / 70200                                     A priori        Appel d'offres                                                                       3,000,000.00                0.00   Annulé                                                               2024-04-07                2024-04-07                                      2024-06-16                2024-08-29                2024-10-03                2026-03-27
e la solution électronique de                       ment at Central Governmen                                            l                     Envelope
gestion des marchés publics                         t Level
(e-GP)



NON CONSULTING SERVICES
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                                           Bid Evaluation Report
                                  Loan / Credit N                                                                        Market Approac        Procurement Pr       Prequalification Estimated Am Actual Amount           Process St      Draft Pre-qualificatio     Prequalification Evalu    Draft Bidding Docum Specific Procurement            Bidding Documents a   Proposal Submission
       Description                                        Component                 Review Type       Method                                                                                                                                                                                                                                                                                       and Recommendatio           Signed Contract         Contract Completion
                                         o.                                                                                     h                  ocess                 (Y/N)        ount (US$)      (US$)                  atus            n Documents                 ation Report           ent / Justification Notice / Invitation                  s Issued        / Opening / Minutes
                                                                                                                                                                                                                                                                                                                                                                                                        n for Award
                                                                                                                                                                                                                                          Planned        Actual      Planned       Actual      Planned       Actual      Planned       Actual      Planned    Actual     Planned       Actual       Planned     Actual       Planned       Actual      Planned       Actual
 ZR-COREF-264873-NC-DIR /                           Component 3. Project and C
                                                                                                  Passation de mar
Recrutement d'un prestatair       IDA / 70200       hange Management, and E       A posteriori                           Direct                                                            9,600.00            9,600.00   Achevé                                                               2021-12-10   2021-12-20   2021-12-15   2021-12-20                                                                             2021-12-31   2022-01-02   2022-04-30   2022-05-13
                                                                                                  ché de gré à gré
e de service d'entretien des                        mergency Response
bureaux

 ZR-COREF-264876-NC-DIR /
                                                    Component 3. Project and C
Recrutement d'un prestatair                                                                       Passation de mar
                                  IDA / 70200       hange Management, and E       A posteriori                           Direct                                                          12,000.00            12,000.00   Achevé                                                               2021-12-15   2021-12-20   2021-12-20   2021-12-20                                                                             2021-12-31   2022-01-02   2022-04-30   2022-04-29
e pour le service de gardienn                                                                     ché de gré à gré
                                                    mergency Response
age des bureaux de la Coordi
nation nationale

 ZR-COREF-264970-NC-RFQ /                           Component 3. Project and C
                                                                                                                                               Single Stage - One
Service d'assurance médical       /                 hange Management, and E       A posteriori    Demande de prix        Limited                                                         50,000.00                 0.00   Annulé                                                                                         2021-12-08                                                                                          2022-01-06                2022-04-27
                                                                                                                                               Envelope
e pour le personnel du Projet                       mergency Response
(Période du PPA)

 ZR-COREF-296507-NC-DIR /
Renouvellement contrat pres                         Component 3. Project and C
                                                                                                  Passation de mar
tataire de service d'entretien    IDA / 70200       hange Management, and E       A posteriori                           Direct                                                            7,200.00            7,200.00   Achevé                                                               2022-05-23   2022-05-23   2022-05-25   2022-05-23                                                                             2022-05-29   2022-06-03   2022-07-31   2022-08-21
                                                                                                  ché de gré à gré
et nettoyage des bureaux (d                         mergency Response
e Mai à Juillet 2022) - BAM'S
CLEAN

 ZR-COREF-296508-NC-DIR /
Renouvellement contrat du p
restataire pour le service de                       Component 3. Project and C
                                                                                                  Passation de mar
gardiennage et sécurité des       IDA / 70200       hange Management, and E       A posteriori                           Direct                                                            9,000.00            9,000.00   Achevé                                                               2022-05-23   2022-05-23   2022-05-25   2022-05-23                                                                             2022-05-29   2022-06-03   2022-07-31   2022-07-29
                                                                                                  ché de gré à gré
bureaux de la Coordination N                        mergency Response
ationale du Projet ENCORE (d
e Mai à Juin 2022) - ATALANT
E GROUP

 ZR-COREF-316188-NC-DIR /
                                                    Component 3. Project and C
Renouvellement contrat du p                                                                       Passation de mar
                                  IDA / 70200       hange Management, and E       A posteriori                           Direct - National                                               40,000.00                 0.00   Signé                                                                2022-09-20   2022-11-30   2022-09-22   2022-12-14                                                                             2022-09-26   2022-12-23   2023-09-26
restataire de service de nett                                                                     ché de gré à gré
                                                    mergency Response
oyage des bureaux


 ZR-COREF-316202-NC-DIR /
Renouvellement contrat du p                         Component 3. Project and C
                                                                                                  Passation de mar
restataire de service de gard     IDA / 70200       hange Management, and E       A posteriori                           Direct - National                                               40,000.00                 0.00   Signé                                                                2022-09-20   2022-11-30   2022-09-22   2022-12-14                                                                             2022-09-26   2022-12-23   2023-07-31
                                                                                                  ché de gré à gré
iennage et sécurité des bure                        mergency Response
aux de la Coordination Natio
nale du Projet

 ZR-COREF-345709-NC-RFQ /
Sélection d'une maison de pr
                                                    Component 3. Project and C
oduction (agence de presse)                                                                                                                    Single Stage - One                                                         En attente d'
                                  IDA / 70200       hange Management, and E       A posteriori    Demande de prix        Limited                                                         20,000.00                 0.00                                                                                                  2023-04-22                                                                                          2023-06-17                2023-12-14
pour la prise des images, la c                                                                                                                 Envelope                                                                   exécution
                                                    mergency Response
onception d'un documentaire
sur le lancement du projet d
ans les 5 sites et sa diffusion

 ZR-COREF-345004-NC-DIR /
Renouvellement contrat du p
                                                    Component 3. Project and C
restataire de service de gard                                                                     Passation de mar                                                                                                        En attente d'
                                  IDA / 70200       hange Management, and E       A posteriori                           Direct - National                                               40,000.00                 0.00                                                                        2023-07-15                2023-07-25                                                                                          2023-07-31                2024-07-30
iennage et sécurité des bure                                                                      ché de gré à gré                                                                                                        exécution
                                                    mergency Response
aux de la Coordination Natio
nale du Projet avec ATALAN
T Group

 ZR-COREF-345000-NC-DIR /
Contrat de prestation de serv                       Component 3. Project and C
                                                                                                  Passation de mar                                                                                                        En attente d'
ice de nettoyage des bureau IDA / 70200             hange Management, and E       A posteriori                           Direct - National                                               40,000.00                 0.00                                                                        2023-07-15                2023-07-25                                                                                          2023-07-29                2024-07-28
                                                                                                  ché de gré à gré                                                                                                        exécution
x de la Coordination du Proje                       mergency Response
t ENCORE, Etablissement BA
M’S CLEAN

 ZR-COREF-356049-NC-RFQ /
Fourniture, installation et par                     Component 1. Strengthenin
amétrage du réseau dans les                         g Public Resources Manage                                                                  Single Stage - One                                                         En attente d'
                                  IDA / 70200                                     A posteriori    Demande de prix        Limited                                                        100,000.00                 0.00                                                                                                  2023-05-04                                                                                          2023-06-29                2023-12-26
4 centres d'ordonnancement                          ment at Central Governmen                                                                  Envelope                                                                   exécution
des Mininistères: Santé, EPS                        t Level
T, ITPR, et Développement ru
ral

 ZR-COREF-378721-NC-DIR /
Service d'une agence de co
mmunication pour la product                         Component 3. Project and C
                                                                                                  Passation de mar                                                                                                        En attente d'
ion d'un magazine radiotélév IDA / 70200            hange Management, and E       A posteriori                           Direct - National                                               30,000.00                 0.00                                                                        2023-09-05                2023-09-07                                                                                          2023-09-11                2024-09-10
                                                                                                  ché de gré à gré                                                                                                        exécution
isé trimestriel sur le process                      mergency Response
us de réforme des finances p
ubliques avec la participation
des parties prenantes avec A
GEM
 ZR-COREF-378867-NC-DIR /
Service d'une agence de co
mmunication pour la prise de                        Component 3. Project and C
                                                                                                  Passation de mar                                                                                                        En attente d'
s images, la conception d'un IDA / 70200            hange Management, and E       A posteriori                           Direct - National                                               40,000.00                 0.00                                                                        2023-09-15                2023-09-17                                                                                          2023-09-21                2024-09-20
                                                                                                  ché de gré à gré                                                                                                        exécution
documentaire sur le lanceme                         mergency Response
nt du projet dans les 5 sites
et sa diffusion avec l'agence
RCT (Radio Contrôle Télévisi
on)


CONSULTING FIRMS
Activity Reference No. /                                                                                                                                                                                                                                                                                                                                                              Combined Evaluation
                                  Loan / Credit N                                                                        Market Approac         Contract Type       Estimated Amo    Actual Amoun                                                       Expression of Interes     Short List and Draft R    Request for Proposal      Opening of Technical    Evaluation of Techni
       Description                                        Component                 Review Type        Method                                                                                         Process Status       Terms of Reference                                                                                                                                         Report and Draft Neg        Signed Contract         Contract Completion
                                         o.                                                                                     h                                      unt (US$)        t (US$)                                                               t Notice            equest for Proposals          s as Issued            Proposals / Minutes       cal Proposal
                                                                                                                                                                                                                                                                                                                                                                                         otiated Contract
                                                                                                                                                                                                                           Planned         Actual       Planned       Actual      Planned       Actual      Planned       Actual      Planned       Actual    Planned     Actual       Planned     Actual       Planned       Actual      Planned       Actual

 ZR-COREF-264820-CS-CQS /
                                                    Component 1. Strengthenin                     Sélection fondée
Sélection d'un Cabinet Inter
                                                    g Public Resources Manage                     sur les qualificatio   Open - Internationa
national pour le développem       IDA / 70200                                     A posteriori                                                                          150,000.00      145,400.00    Signé               2021-12-10      2021-12-16    2022-01-09   2022-01-06   2022-01-24   2022-03-24                                                                             2022-02-03   2022-04-05   2022-02-13   2022-05-26   2022-04-29
                                                    ment at Central Governmen                     ns des consultant      l
ent de la stratégie de mise e
                                                    t Level                                       s
n œuvre d'une solution e-GP


 ZR-COREF-264866-CS-CQS /
                                                                                                  Sélection fondée
Sélection d'un Cabinet pour l                       Component 3. Project and C
                                                                                                  sur les qualificatio
a rédaction du manuel des pr IDA / 70200            hange Management, and E       A posteriori                           Open - National                                 50,000.00       47,410.00    Achevé              2021-12-22      2021-12-16    2022-01-05   2021-12-23   2022-01-25   2022-03-01                                                                             2022-02-01   2022-03-14   2022-02-18   2022-03-19   2022-04-29   2022-07-15
                                                                                                  ns des consultant
océdures de gestion financiè                        mergency Response
                                                                                                  s
re et de la passation des mar
chés du Projet ENCORE

 ZR-COREF-264867-CS-CQS /                                                                         Sélection fondée
                                                    Component 3. Project and C
Sélection d'un Cabinet Web                                                                        sur les qualificatio
                                  IDA / 70200       hange Management, and E       A posteriori                           Open - National                                 15,000.00             0.00   Signé               2021-12-20      2022-01-25    2022-01-03                2022-01-23   2022-03-16                                                                             2022-02-02   2022-05-30   2022-02-19   2022-06-09   2022-04-30
master pour la mise en place                                                                      ns des consultant
                                                    mergency Response
du Site WEB du Projet ENCO                                                                        s
RE




                                                                                                                                                                                                                                               Page 5
 ZR-COREF-265013-CS-CQS /                        Component 2. Supporting                      Sélection fondée
Sélection d'un Cabinet Web                       Resource Management at th                    sur les qualificatio
                                   IDA / 70200                                 A posteriori                          Open - National         45,000.00    44,554.80   Signé               2021-12-20   2022-01-25    2022-01-03                2022-01-23   2022-03-16                                                       2022-01-28   2022-05-30   2022-02-17   2022-06-06   2022-04-30
master pour la mise en place                     e Provincial Government Lev                  ns des consultant
du Site WEB de 4 provinces s                     el                                           s
électionnées

 ZR-COREF-296044-CS-QCBS
                                                 Component 1. Strengthenin
/ Sélection d'un Consultant fi                                                                Sélection fondée
                                                 g Public Resources Manage                                           Open - Internationa                              En cours d'exécut
rme pour accompagner la mi         IDA / 70200                                 A priori       sur la qualité et le                         2,000,000.00        0.00                       2022-06-15   2022-06-13    2022-07-30   2022-06-23   2022-09-03   2023-07-13   2022-10-03   2023-09-18   2022-10-24   2023-11-13   2022-11-17                2022-12-22                2024-12-21
                                                 ment at Central Governmen                                           l                                                ion
se en service effective des st                                                                coût
                                                 t Level
ructures de la DGTCP


 ZR-COREF-264863-CS-LCS /
Sélection d'un Cabinet indép                     Component 3. Project and C
                                                                                              Sélection au moin      Open - Internationa
endant pour l'Audit financier      /             hange Management, and E       A posteriori                                                  25,000.00         0.00   Annulé              2021-12-10                 2021-12-31                2022-01-21                2022-02-18                2022-02-25                2022-03-17                2022-03-31                2022-06-29
                                                                                              dre coût               l
externe sur la gestion fiducia                   mergency Response
ire du PPA clos au 30/04/202
2

 ZR-COREF-344156-CS-QCBS
/ Recrutement d'un Consulta
nt International firme pour le                   Component 1. Strengthenin
                                                                                              Sélection fondée
renforcement de capacités d                      g Public Resources Manage                                           Open - Internationa                              En attente d'exéc
                                   IDA / 70200                                 A posteriori   sur la qualité et le                          150,000.00         0.00                       2023-04-20                 2023-05-11                2023-06-24                2023-07-22                2023-08-21                2023-09-25                2023-10-30                2024-10-29
es membres de la Commissio                       ment at Central Governmen                                           l                                                ution
                                                                                              coût
n interministérielle de la vali                  t Level
dation des études de faisabili
té d'un projet minier avec la
participation des OSC

 ZR-COREF-344187-CS-QCBS
/ Recrutement d'un Cabinet i
                                                 Component 1. Strengthenin
nternational pour évaluer le                                                                  Sélection fondée
                                                 g Public Resources Manage                                           Open - Internationa                              En cours d'exécut
s besoins en renforcement d        IDA / 70200                                 A posteriori   sur la qualité et le                          180,000.00         0.00                       2023-03-18   2023-06-21    2023-04-08   2023-08-17   2023-05-13                2023-06-10                2023-07-01                2023-08-05                2023-09-09                2024-09-08
                                                 ment at Central Governmen                                           l                                                ion
e capacités des services inte                                                                 coût
                                                 t Level
rvenant dans la gestion des r
evenus miniers et autres par
ties prenantes

 ZR-COREF-344190-CS-QCBS
/ Recrutement d'un Cabinet i
                                                 Component 1. Strengthenin
nternational pour évaluer le                                                                  Sélection fondée
                                                 g Public Resources Manage                                           Open - Internationa                              En attente d'exéc
s besoins techniques en renf       IDA / 70200                                 A posteriori   sur la qualité et le                          180,000.00         0.00                       2023-03-15                 2023-04-05                2023-05-10                2023-06-07                2023-07-07                2023-08-11                2023-09-15                2024-09-14
                                                 ment at Central Governmen                                           l                                                ution
orcement de capacités de la                                                                   coût
                                                 t Level
Commission interministériell
e d'harmonisation et de cons
olidation des statistiques min
ières
 ZR-COREF-344276-CS-QCBS
/ Recrutement d’une Cabinet
International devant appuyer
                                                 Component 1. Strengthenin
le gouvernement à : (i) défini                                                                Sélection fondée
                                                 g Public Resources Manage                                           Open - Internationa                              En attente d'exéc
r le nouveau cadre organisati      IDA / 70200                                 A posteriori   sur la qualité et le                          180,000.00         0.00                       2023-04-10                 2023-05-01                2023-06-05                2023-07-03                2023-07-24                2023-08-28                2023-10-02                2024-10-01
                                                 ment at Central Governmen                                           l                                                ution
onnel et juridique, (ii) élabor                                                               coût
                                                 t Level
er le manuel de procédures
des dépenses non salariales
; (iii) proposer l'adaption de l
a chaîne de dépense/sys

 ZR-COREF-344288-CS-QCBS
/ Recrutement d'un cabinet p                     Component 1. Strengthenin
                                                                                              Sélection fondée
our assurer la formation des                     g Public Resources Manage                                           Open - Internationa                              En attente d'exéc
                              IDA / 70200                                      A posteriori   sur la qualité et le                          400,000.00         0.00                       2023-04-03                 2023-04-24                2023-05-29                2023-06-26                2023-07-17                2023-08-21                2023-09-25                2024-09-24
DAF suivant plan de formatio                     ment at Central Governmen                                           l                                                ution
                                                                                              coût
n sur une période de 6 mois (                    t Level
suivant les modules et group
es)

 ZR-COREF-344335-CS-QCBS
/ Recrutement d'une Firme c
                                                 Component 1. Strengthenin
hargée d'appuyer le Ministèr                                                                  Sélection fondée
                                                 g Public Resources Manage                                           Open - Internationa                              En cours d'exécut
e de la Fonction Publique en       IDA / 70200                                 A posteriori   sur la qualité et le                          600,000.00         0.00                       2023-03-27   2023-04-21    2023-04-17                2023-05-31                2023-06-28                2023-07-28                2023-09-01                2023-10-06                2024-10-05
                                                 ment at Central Governmen                                           l                                                ion
matière de la méthologie et                                                                   coût
                                                 t Level
planification de la constitutio
n du Fichier de Référence de
l'Administration Publique

 ZR-COREF-344343-CS-QCBS                         Component 1. Strengthenin
                                                                                              Sélection fondée
/ Recrutement d'une Firme p                      g Public Resources Manage                                           Open - Internationa                              En cours d'exécut
                                   IDA / 70200                                 A priori       sur la qualité et le                         1,300,000.00        0.00                       2023-03-15                 2023-04-05                2023-05-19                2023-06-16                2023-07-16                2023-08-20                2023-09-24                2024-09-23
our la constitution du Fichier                   ment at Central Governmen                                           l                                                ion
                                                                                              coût
de Référence de l'Administra                     t Level
tion Publique

 ZR-COREF-344418-CS-QCBS
/ Recrutement d’une firme p
our l'assistance en maître d'
                                                 Component 1. Strengthenin
ouvrage du SIGeFiP avec le n                                                                  Sélection fondée
                                                 g Public Resources Manage                                           Open - Internationa                              En attente d'exéc
oyau composé des modules           IDA / 70200                                 A posteriori   sur la qualité et le                          150,000.00         0.00                       2023-05-08                 2023-05-29                2023-07-12                2023-08-09                2023-09-08                2023-10-13                2023-11-17                2024-11-16
                                                 ment at Central Governmen                                           l                                                ution
comptable et budgétaire (étu                                                                  coût
                                                 t Level
des préalables et analyse de
s besoins complémentaires e
n renforcement de capacités
et en équipements pour la m
ise en pla
 ZR-COREF-344472-CS-LCS /                        Component 1. Strengthenin
Recrutement d'un cabinet int                     g Public Resources Manage                    Sélection au moin      Open - Internationa                              En attente d'exéc
                                   IDA / 70200                                 A posteriori                                                 160,000.00         0.00                       2023-04-05                 2023-04-26                2023-06-09                2023-07-07                2023-08-06                2023-09-10                2023-10-15                2024-01-13
ernational chargé de l'audit i                   ment at Central Governmen                    dre coût               l                                                ution
ndépendant en PPP (exercice                      t Level
2019-2022)

 ZR-COREF-344478-CS-QCBS
/ Recrutement d’un consulta
                                                 Component 1. Strengthenin
nt sénior international pour l’                                                               Sélection fondée
                                                 g Public Resources Manage                                           Open - Internationa                              En cours d'exécut
élaboration de la stratégie d      IDA / 70200                                 A posteriori   sur la qualité et le                          100,000.00         0.00                       2023-03-22   2023-05-20    2023-04-12                2023-05-26                2023-06-23                2023-07-23                2023-08-27                2023-10-01                2023-11-30
                                                 ment at Central Governmen                                           l                                                ion
e renforcement des capacité                                                                   coût
                                                 t Level
s, de formation et de professi
onnalisation des acteurs nati
onaux de la commande publ
ique.
 ZR-COREF-344507-CS-QCBS                         Component 1. Strengthenin
                                                                                              Sélection fondée
/ Recrutement d'une firme p                      g Public Resources Manage                                                                                            En cours d'exécut
                                   IDA / 70200                                 A posteriori   sur la qualité et le   Open - National        300,000.00         0.00                       2023-03-20   2023-04-10    2023-04-10                2023-05-24                2023-06-21                2023-07-21                2023-08-25                2023-09-29                2023-12-28
our réaliser l'audit organisati                  ment at Central Governmen                                                                                            ion
                                                                                              coût
onnel du Conseil Supérieur d                     t Level
u Portefeuille (CSP)

 ZR-COREF-344884-CS-QCBS
/ Recrutement d'un Cabinet
pour assistance-métier et tec
                                                 Component 2. Supporting
hnique pour la mise en place                                                                  Sélection fondée
                                                 Resource Management at th                                           Open - Internationa                              En attente d'exéc
d'un système d'informations        IDA / 70200                                 A posteriori   sur la qualité et le                          500,000.00         0.00                       2023-04-05                 2023-04-26                2023-06-09                2023-07-07                2023-08-06                2023-09-10                2023-10-15                2024-10-14
                                                 e Provincial Government Lev                                         l                                                ution
de collecte des prélèvements                                                                  coût
                                                 el
fiscaux et non fiscaux dans l
es 4 provinces (du Kasaï Orie
ntal, du Kasaï, du Kasaï Cent
ral et de Lomami)

 ZR-COREF-345075-CS-CQS /                                                                     Sélection fondée
                                                 Component 3. Project and C
Recrutement d’une ONG spé                                                                     sur les qualificatio                                                    En cours d'exécut
                                   IDA / 70200   hange Management, and E       A posteriori                          Open - National        300,000.00         0.00                       2023-04-07   2023-04-11    2023-04-28                2023-06-11                                                                    2023-07-11                2023-08-15                2024-02-11
cialisée en VBG pendant la m                                                                  ns des consultant                                                       ion
                                                 mergency Response
ise en œuvre du projet                                                                        s


 ZR-COREF-344126-CS-QCBS
/ Recrutement d'un Consulta
                                                 Component 1. Strengthenin
nt International firme pour la                                                                Sélection fondée
                                                 g Public Resources Manage                                           Open - Internationa                              En cours d'exécut
réalisation de l'étude sur le p    IDA / 70200                                 A posteriori   sur la qualité et le                          100,000.00         0.00                       2023-04-15   2023-09-27    2023-04-29   2023-10-25   2023-06-03                2023-07-01                2023-07-03                2023-08-07                2023-09-11                2024-09-10
                                                 ment at Central Governmen                                           l                                                ion
otentiel fiscal du secteur min                                                                coût
                                                 t Level
ier de la République Démocr
atique du Congo y compris l'
analyse et l'audit du régime f
iscal
 ZR-COREF-356052-CS-CQS /
Recrutement d’un Cabinet in
                                                                                              Sélection fondée
ternational chargé d' (i) éval                   Component 3. Project and C
                                                                                              sur les qualificatio   Open - Internationa                              En cours d'exécut
uation environnementale et         IDA / 70200   hange Management, and E       A posteriori                                                 400,000.00         0.00                       2023-04-25   2023-05-12    2023-05-16                2023-06-29                                                                    2023-07-29                2023-09-02                2024-02-29
                                                                                              ns des consultant      l                                                ion
sociale stratégique et (ii) éva                  mergency Response
                                                                                              s
luation du partage des bénéf
ices de l’exploitation minière
avec les communautés local
es
 ZR-COREF-355930-CS-CQS /
                                                                                              Sélection fondée
Recrutement d'un cabinet ch                      Component 3. Project and C
                                                                                              sur les qualificatio   Open - Internationa                              En cours d'exécut
argé de l'audit financier et co    IDA / 70200   hange Management, and E       A posteriori                                                  50,000.00         0.00                       2023-04-18   2023-04-24    2023-05-09                2023-06-22                                                                    2023-07-22                2023-08-26                2024-02-22
                                                                                              ns des consultant      l                                                ion
mptable du Projet ENCORE p                       mergency Response
                                                                                              s
our l'exercice clos 2022 com
prenant aussi le PPA

 ZR-COREF-355935-CS-QCBS
/ Recrutement d'un cabinet c                     Component 3. Project and C                   Sélection fondée
                                                                                                                     Open - Internationa                              En cours d'exécut
hargé de l'audit financier et c IDA / 70200      hange Management, and E       A posteriori   sur la qualité et le                          150,000.00         0.00                       2023-05-05   2023-09-28    2023-05-26   2023-11-20   2023-06-11                2023-07-09                2023-08-08                2023-09-12                2023-10-17                2024-10-16
                                                                                                                     l                                                ion
omptable du Projet ENCORE                        mergency Response                            coût
pour les Exercices 2023, 202
4 et 2025

 ZR-COREF-345046-CS-QCBS                         Component 3. Project and C                   Sélection fondée
                                                                                                                     Open - Internationa
/ Recrutement d'un auditeur        IDA / 70200   hange Management, and E       A posteriori   sur la qualité et le                          120,000.00         0.00   Annulé              2023-03-10   2023-03-16    2023-03-31                2023-04-16                2023-05-14                2023-06-13                2023-07-18                2023-08-22                2024-08-21
                                                                                                                     l
externe (cabinet)                                mergency Response                            coût


 ZR-COREF-369149-CS-CQS /
Recrutement d'un cabinet in                      Component 1. Strengthenin                    Sélection fondée
dépendant chargé d'évaluer l                     g Public Resources Manage                    sur les qualificatio   Open - Internationa                              En cours d'exécut
                             IDA / 70200                                       A posteriori                                                 300,000.00         0.00                       2023-06-28   2023-07-13    2023-07-19   2023-08-17   2023-09-01                                                                    2023-10-01                2023-11-05                2024-05-03
e niveau d'exécution des réf                     ment at Central Governmen                    ns des consultant      l                                                ion
ormes engagées par les entr                      t Level                                      s
eprises publiques du secteur
extractif




                                                                                                                                                                                                            Page 6
 ZR-COREF-368173-CS-CQS /
Recrutement du cabinet inte                          Component 1. Strengthenin                     Sélection fondée
rnational chargé d'élaborer l                        g Public Resources Manage                     sur les qualificatio   Open - Internationa                                                    En cours d'exécut
                                   IDA / 70200                                     A posteriori                                                                      400,000.00           0.00                       2023-06-28   2023-07-10    2023-07-19   2023-08-17   2023-09-01                                                                    2023-10-01   2023-11-05   2024-05-03
e rapport ITIE sur l'exploitati                      ment at Central Governmen                     ns des consultant      l                                                                      ion
on minière artisanale et à pe                        t Level                                       s
tite échelle dans la filière dia
mant au Kasaï Oriental et au
Kasaï
 ZR-COREF-368478-CS-CQS /
Recrutement d'un consultant
                                                                                                   Sélection fondée
(firme) chargé d'(I) évaluatio                       Component 3. Project and C
                                                                                                   sur les qualificatio   Open - Internationa                                                    En cours d'exécut
n environnementale et social       IDA / 70200       hange Management, and E       A posteriori                                                                      400,000.00           0.00                       2023-06-28   2023-07-14    2023-07-19                2023-09-01                                                                    2023-10-01   2023-11-05   2024-05-03
                                                                                                   ns des consultant      l                                                                      ion
e stratégique et (II) évaluatio                      mergency Response
                                                                                                   s
n du partage des bénéfices d
e l'exploitation minière avec
les communautés locales

 ZR-COREF-379132-CS-QCBS
/ Recrutement d'un consulta
                                                     Component 3. Project and C                    Sélection fondée
nt firme chargée de l'audit d                                                                                             Open - Internationa                                                    En attente d'exéc
                                   IDA / 70200       hange Management, and E       A posteriori    sur la qualité et le                                              350,000.00           0.00                       2023-10-06                 2023-10-27                2023-12-10                                 2024-01-07            2024-02-06   2024-03-12   2024-04-16   2025-04-16
es dépenses éligibles au pro                                                                                              l                                                                      ution
                                                     mergency Response                             coût
gramme (PDE) pour la périod
e allant du 1er mars au 31 d
écembre 2024

 ZR-COREF-379133-CS-CQS /
                                                     Component 1. Strengthenin                     Sélection fondée
Recrutement d'un cabinet int
                                                     g Public Resources Manage                     sur les qualificatio   Open - Internationa                                                    En attente d'exéc
ernational pour le renforcem       IDA / 70200                                     A posteriori                                                                      350,000.00           0.00                       2023-10-05                 2023-10-26                2023-12-09                                                                    2024-01-08   2024-02-12   2024-08-10
                                                     ment at Central Governmen                     ns des consultant      l                                                                      ution
ent des capacités de 600 act
                                                     t Level                                       s
eurs de la commande publiq
ue

 ZR-COREF-355997-CS-CQS /
Recrutement du Cabinet Inte
rnational chargé d'effectuer l                       Component 1. Strengthenin                     Sélection fondée
'étude de cadrage sur l'artisa                       g Public Resources Manage                     sur les qualificatio   Open - Internationa
                                   IDA / 70200                                     A posteriori                                                                      200,000.00           0.00   Annulé              2023-04-25                 2023-05-16                2023-06-29                                                                    2023-07-29   2023-09-02   2024-02-29
nat minier, Filière Diamant a                        ment at Central Governmen                     ns des consultant      l
u Kasaï Oriental et Kasaï aup                        t Level                                       s
rès des régies provinciales (E
TDs et Direction des recettes
provinciales)

 ZR-COREF-356053-CS-CQS /
Recrutement d'un Cabinet In
                                                     Component 1. Strengthenin                     Sélection fondée
dépendant chargé d'élaborer
                                                     g Public Resources Manage                     sur les qualificatio   Open - Internationa
le Rapport sur l'artisanat min     IDA / 70200                                     A posteriori                                                                      130,000.00           0.00   Annulé              2023-04-25                 2023-05-16                2023-06-29                                                                    2023-07-29   2023-09-02   2024-02-29
                                                     ment at Central Governmen                     ns des consultant      l
ier, Filière Diamant au Kasaï
                                                     t Level                                       s
Oriental et Kasaï auprès des
régies provinciales (ETD et D
irection des recettes provinci
ales).
 ZR-COREF-396994-CS-CQS /
Recrutement d'une Agence d
                                                                                                   Sélection fondée
e communication pour la pro                          Component 3. Project and C
                                                                                                   sur les qualificatio                                                                          En cours d'exécut
duction d'un magazine radiot       IDA / 70200       hange Management, and E       A posteriori                           Open - National                             30,000.00           0.00                       2023-12-15   2024-01-10    2024-01-05   2024-02-22   2024-02-18                                                                    2024-03-19   2024-04-23   2024-10-20
                                                                                                   ns des consultant                                                                             ion
élévisé sur les réformes des f                       mergency Response
                                                                                                   s
inances publiques, avec la p
articipation des parties pren
antes

 ZR-COREF-400211-CS-CQS /
Recrutement d'un cabinet int
                                                     Component 1. Strengthenin                     Sélection fondée
ernational pour évaluer les b
                                                     g Public Resources Manage                     sur les qualificatio
esoins en renforcement de c        IDA / 70200                                     A posteriori                           Limited                                    180,000.00           0.00   Annulé              2024-02-01   2024-01-10                              2024-02-15                                                                    2024-03-16   2024-04-20   2024-10-17
                                                     ment at Central Governmen                     ns des consultant
apacités des services interve
                                                     t Level                                       s
nant dans la gestion des rev
enus miniers et autres partie
s prenantes

 ZR-COREF-411780-CS-QCBS
/ Recrutement d’un consulta
                                                     Component 1. Strengthenin
nt international firme pour la                                                                     Sélection fondée
                                                     g Public Resources Manage                                            Open - Internationa                                                    En cours d'exécut
réalisation de l’étude sur le p    IDA / 70200                                     A posteriori    sur la qualité et le                                              300,000.00           0.00                       2024-04-14   2024-03-11    2024-05-05   2024-03-25   2024-06-18                                 2024-07-16            2024-08-15   2024-09-19   2024-10-24   2025-10-24
                                                     ment at Central Governmen                                            l                                                                      ion
otentiel fiscal du secteur min                                                                     coût
                                                     t Level
ier de la République Démocr
atique du Congo, y compris l’
analyse et l’audit du régime f
iscal
 ZR-COREF-410592-CS-CQS /
Recrutement du Consultant c                          Component 1. Strengthenin                     Sélection fondée
abinet chargé de mener l'étu                         g Public Resources Manage                     sur les qualificatio   Open - Internationa                                                    En cours d'exécut
                                   IDA / 70200                                     A posteriori                                                                      300,000.00           0.00                       2024-04-08   2024-03-06    2024-04-29   2024-03-25   2024-06-12                                                                    2024-07-12   2024-08-16   2025-02-12
de d'évaluation du niveau de                         ment at Central Governmen                     ns des consultant      l                                                                      ion
réalisation du FOMIN par rap                         t Level                                       s
port aux recettes calculées p
ar les Divisions des Mines

 ZR-COREF-410761-CS-CQS /
Recrutement d'un consultant
                                                     Component 1. Strengthenin                     Sélection fondée
cabinet pour l'élaboration d'u
                                                     g Public Resources Manage                     sur les qualificatio   Open - Internationa                                                    En cours d'exécut
n plan de formation des acte       IDA / 70200                                     A posteriori                                                                      350,000.00           0.00                       2024-04-08   2024-03-04    2024-04-29   2024-03-25   2024-06-12                                                                    2024-07-12   2024-08-16   2025-02-12
                                                     ment at Central Governmen                     ns des consultant      l                                                                      ion
urs du secteur du portefeuill
                                                     t Level                                       s
e (CSP, COPIREP, Secrétariat
Géneral et managers des ent
reprises publiques ciblées pa
r le projet
 ZR-COREF-344755-CS-QCBS
/ Recrutement d'un consulta
                                                     Component 1. Strengthenin
nt cabinet pour l'élaboration                                                                      Sélection fondée
                                                     g Public Resources Manage                                            Open - Internationa
d'un plan de renforcement d        IDA / 70200                                     A posteriori    sur la qualité et le                                              250,000.00           0.00   Annulé              2023-04-13   2024-02-12    2023-05-04                2023-06-17                                 2023-07-15            2023-08-14   2023-09-18   2023-10-23   2024-10-22
                                                     ment at Central Governmen                                            l
es capacités du CSP, COPIRE                                                                        coût
                                                     t Level
P, du Secrétariat Général et
des managers des entreprise
s publiques ciblées par le pro
jet
 ZR-COREF-411797-CS-CQS /
Recrutement d'un cabinet int
                                                     Component 1. Strengthenin                     Sélection fondée
ernational pour évaluer les b
                                                     g Public Resources Manage                     sur les qualificatio   Open - Internationa                                                    En cours d'exécut
esoins en renforcement de c        IDA / 70200                                     A posteriori                                                                      300,000.00           0.00                       2024-04-14   2024-03-11    2024-04-14   2024-03-25   2024-04-14                                                                    2024-04-14   2024-04-14   2024-04-14
                                                     ment at Central Governmen                     ns des consultant      l                                                                      ion
apacités des services interve
                                                     t Level                                       s
nant dans la gestion des rev
enus miniers et autres partie
s prenantes

 ZR-COREF-414212-CS-CQS /
                                                     Component 2. Supporting                       Sélection fondée
Recrutement d'un consultant
                                                     Resource Management at th                     sur les qualificatio                                                                          En attente d'exéc
cabinet pour mener une étud        IDA / 70200                                     A posteriori                           Open - National                            300,000.00           0.00                       2024-04-07                 2024-04-28                2024-06-11                                                                    2024-07-11   2024-08-15   2025-02-11
                                                     e Provincial Government Lev                   ns des consultant                                                                             ution
e sur le potentiel fiscal en fa
                                                     el                                            s
veur de quatre provinces EN
CORE

 ZR-COREF-414234-CS-CQS /
                                                     Component 1. Strengthenin                     Sélection fondée
Recrutement d'un Consultant
                                                     g Public Resources Manage                     sur les qualificatio   Open - Internationa                                                    En cours d'exécut
cabinet chargé d'élaborer le       IDA / 70200                                     A posteriori                                                                      300,000.00           0.00                       2024-04-21   2024-03-25    2024-05-12                2024-06-25                                                                    2024-07-25   2024-08-29   2025-02-25
                                                     ment at Central Governmen                     ns des consultant      l                                                                      ion
Rapport ITIE-RDC sur l'EMAP
                                                     t Level                                       s
E, Filière Diamant, Exercice 2
023

 ZR-COREF-419326-CS-QCBS
                                                     Component 1. Strengthenin
/ Recrutement d'un cabinet i                                                                       Sélection fondée
                                                     g Public Resources Manage                                            Open - Internationa                                                    En cours d'exame
ndépendant chargé de mene          IDA / 70200                                     A posteriori    sur la qualité et le                                              300,000.00           0.00                       2024-05-05   2024-04-10    2024-05-26                2024-07-09                                 2024-08-06            2024-09-05   2024-10-10   2024-11-14   2025-11-14
                                                     ment at Central Governmen                                            l                                                                      n
r l'étude d'évaluation des rés                                                                     coût
                                                     t Level
erves escomptées du Projet
SICOMINES

 ZR-COREF-419336-CS-QCBS
/ Recrutement d'un consulta
nt cabinet pour la conception                        Component 3. Project and C                    Sélection fondée
                                                                                                                          Open - Internationa                                                    En cours d'exame
et l'implémentation d'un logi      IDA / 70200       hange Management, and E       A posteriori    sur la qualité et le                                              100,000.00           0.00                       2024-05-05   2024-04-10    2024-05-26                2024-07-09                                 2024-08-06            2024-09-05   2024-10-10   2024-11-14   2025-11-14
                                                                                                                          l                                                                      n
ciel de gestion du projet et d                       mergency Response                             coût
es composantes de suivi et é
valuation du Projet ENCORE,
y compris les CBP

 ZR-COREF-410748-CS-CQS /
Recrutement d’une firme po
ur l'assistance en maître d'o
                                                                                                   Sélection fondée
uvrage du SIGeFiP avec le no                         Component 3. Project and C
                                                                                                   sur les qualificatio   Limited - Internatio
yau composé des modules b          IDA / 70200       hange Management, and E       A posteriori                                                                      500,000.00           0.00   Annulé              2024-03-01   2024-03-07                              2024-03-15                                                                    2024-04-14   2024-05-19   2025-01-14
                                                                                                   ns des consultant      nal
udgétaire, comptable et gest                         mergency Response
                                                                                                   s
ion de la trésorerie (études p
réalables et analyse des bes
oins complémentaires en ren
forcement de capacité et en
équipe
 ZR-COREF-420801-CS-QCBS
/ Recrutement d’une firme p
our l'assistance en maître d'
                                                     Component 1. Strengthenin
ouvrage du SIGeFiP avec le n                                                                       Sélection fondée
                                                     g Public Resources Manage                                            Open - Internationa                                                    En cours d'exame
oyau composé des modules           IDA / 70200                                     A posteriori    sur la qualité et le                                              600,000.00           0.00                       2024-04-05   2024-04-17    2024-04-26                2024-06-09                                 2024-07-07            2024-08-06   2024-09-10   2024-10-15   2025-10-15
                                                     ment at Central Governmen                                            l                                                                      n
budgétaire, comptable et ge                                                                        coût
                                                     t Level
stion de la trésorerie (études
préalables et analyse des be
soins complémentaires en re
nforcement de capacité et e
n équipe


INDIVIDUAL CONSULTANTS
Activity Reference No. /                                                                                                                                                                                                                        Invitation to Identifie
                                   Loan / Credit N                                                                        Market Approac         Contract Type   Estimated Amo    Actual Amoun                                                                            Draft Negotiated Con
       Description                                         Component                 Review Type        Method                                                                                   Process Status      Terms of Reference         d/Selected Consultan                              Signed Contract    Contract Completion
                                          o.                                                                                     h                                  unt (US$)        t (US$)                                                                                      tract
                                                                                                                                                                                                                                                           t
                                                                                                                                                                                                                     Planned       Actual        Planned       Actual     Planned      Actual    Planned    Actual   Planned      Actual




                                                                                                                                                                                                                                       Page 7
 ZR-COREF-264859-CS-INDV
/ Sélection d'un Consultant in                  Component 3. Project and C
dividuel pour la rédaction du     IDA / 70200   hange Management, and E       A posteriori   Individuel           Open      30,000.00   43,000.00   Signé    2021-12-15   2021-12-15    2022-01-13   2022-03-01   2022-01-20   2022-03-29   2022-02-01   2022-04-12   2022-04-28   2023-02-28
manuel de vérification des P                    mergency Response
BCs et PBPs du Projet ENCOR
E

 ZR-COREF-265030-CS-INDV
/ Sélection d'un consultant in
                                                Component 2. Supporting
dividuel pour réaliser une ét
                                                Resource Management at th
ude de faisabilité pour la mis    IDA / 70200                                 A posteriori   Individuel           Open      50,000.00        0.00   Annulé   2021-12-20   2022-02-24    2022-01-22                2022-02-01                2022-02-14                2022-04-30
                                                e Provincial Government Lev
e en place des administratio
                                                el
ns provinciales du trésor, de
la comptabilité et du budget
dans 4 provinces identifiées

 ZR-COREF-265038-CS-INDV
/ Sélection d'un Consultant in
                                                Component 3. Project and C
dividuel chargé de finaliser l
                                  IDA / 70200   hange Management, and E       A posteriori   Individuel           Open      25,000.00   22,035.00   Achevé   2021-11-25   2021-12-15    2021-12-28   2022-02-18   2022-01-07   2022-03-11   2022-01-19   2022-03-18   2022-04-30   2022-07-15
e Plan de mobilisation des pa
                                                mergency Response
rties prenantes (PMPP) et les
Procédures de gestion de ma
in-d’œuvre (PGMO)

 ZR-COREF-265039-CS-INDV
                                                Component 3. Project and C
/ Sélection d'un Consultant in
                                  IDA / 70200   hange Management, and E       A posteriori   Individuel           Open      25,000.00   24,893.00   Achevé   2021-12-20   2021-12-15    2022-01-15   2022-03-01   2022-01-29   2022-03-11   2022-02-09   2022-03-18   2022-04-30   2022-07-17
dividuel chargé de finaliser l
                                                mergency Response
e Plan d'Action VBG - EAS/HS


 ZR-COREF-265078-CS-CDS /
Sélection d'un Consultant Na
                                                Component 1. Strengthenin
tional individuel en Administr                                                               Sélection de cons
                                                g Public Resources Manage
ation Publique chargé d’appu      /                                           A posteriori   ultants par entent   Direct    14,000.00        0.00   Annulé   2021-12-07                 2021-12-15                                          2021-12-30                2022-04-30
                                                ment at Central Governmen
yer la mise en œuvre du Syst                                                                 e directe
                                                t Level
ème Intégré de Gestion des
Ressources Humaines et de l
a Paie (SIGRH-Paie)/ Jean LE
MA
 ZR-COREF-265088-CS-INDV
/ Sélection d'un consultant in
                                                Component 1. Strengthenin
ternational pour 4 mois (CTP)
                                                g Public Resources Manage
chargé d’accompagner l’équi       IDA / 70200                                 A posteriori   Individuel           Limited   40,000.00        0.00   Signé    2021-12-20   2022-03-08    2021-12-25   2022-03-29   2022-01-15   2022-12-30   2022-02-01   2023-01-08   2022-04-02
                                                ment at Central Governmen
pe technique nationale dans
                                                t Level
l'organisation de l'enquête et
l'actualisation de la base d'é
chantillonnage (ECVM)

 ZR-COREF-265089-CS-INDV
/ Sélection d'un consultant in
                                                Component 1. Strengthenin
ternational expert en sondag
                                                g Public Resources Manage
e pour 4 mois chargé d’acco    IDA / 70200                                    A posteriori   Individuel           Limited   40,000.00        0.00   Annulé   2021-12-10   2022-03-08    2021-12-15                2021-12-29                2022-01-10                2022-04-30
                                                ment at Central Governmen
mpagner l’équipe technique
                                                t Level
nationale dans l'organisation
de l'enquête et l'actualisatio
n de la base d'échantillonnag
e
 ZR-COREF-265092-CS-INDV
/ Sélection d'un consultant in
                                                Component 1. Strengthenin
ternational expert en CAPI p
                                                g Public Resources Manage
our 2 mois chargé d’accomp IDA / 70200                                        A posteriori   Individuel           Limited   20,000.00        0.00   Signé    2021-12-15   2022-03-08    2021-12-20   2022-03-29   2022-01-03   2023-03-03   2022-01-15   2023-03-15   2022-04-30
                                                ment at Central Governmen
agner l’équipe technique nati
                                                t Level
onale dans l'organisation de l
'enquête et l'actualisation de
la base d'échantillonnage (E
CVM)
 ZR-COREF-265093-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un Coordonn
                               IDA / 70200      hange Management, and E       A posteriori   ultants par entent   Direct    28,000.00   29,600.00   Achevé   2021-12-10   2021-12-23    2021-12-18   2021-12-24                             2021-12-30   2021-12-29   2022-04-30   2022-04-29
ateur National du Projet (God
                                                mergency Response                            e directe
efroid MISENGA)


 ZR-COREF-265097-CS-CDS /
Recrutement d'un Spécialiste                    Component 3. Project and C                   Sélection de cons
en charge de la réforme du s      IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    18,000.00   19,200.00   Achevé   2021-12-10   2022-01-11    2021-12-18   2022-01-12                             2021-12-30   2022-01-17   2022-04-30   2022-04-29
ystème des marchés publics                      mergency Response                            e directe
(Jean Baptiste VEKO)


 ZR-COREF-265098-CS-CDS /
Recrutement d'un Spécialiste                    Component 3. Project and C                   Sélection de cons
en charge de la réforme du s      IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    18,000.00   19,200.00   Achevé   2021-12-10   2022-01-10    2021-12-18   2022-01-10                             2021-12-30   2022-01-15   2022-04-30   2022-04-29
ystème comptable et gestion                     mergency Response                            e directe
de la trésorerie (Robert BAM
BA)

 ZR-COREF-265100-CS-CDS /
Recrutement d'un Spécialiste                    Component 3. Project and C                   Sélection de cons
en charge de la réforme de l'     /             hange Management, and E       A posteriori   ultants par entent   Direct    18,000.00        0.00   Annulé   2021-12-10                 2021-12-18                                          2021-12-30                2022-04-30
administration fiscale et gest                  mergency Response                            e directe
ion des revenus miniers (Jea
n Pierre SAMOLIA)

 ZR-COREF-265101-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un Spécialiste
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    18,000.00   19,200.00   Achevé   2021-12-10   2022-01-10    2021-12-18   2022-01-10                             2021-12-30   2022-01-15   2022-04-30   2022-04-29
en charge du contrôle intern
                                                mergency Response                            e directe
e et externe (ETIENNE MAFW
ENI)

 ZR-COREF-265103-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un Spécialiste
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    18,000.00   19,200.00   Achevé   2021-12-10   2022-01-11    2021-12-18   2022-01-12                             2021-12-30   2022-01-17   2022-04-30   2022-04-29
en charge de la décentralisat
                                                mergency Response                            e directe
ion financière (Moise ASSANI
)

 ZR-COREF-265104-CS-CDS /                       Component 3. Project and C                   Sélection de cons
Recrutement d'un Responsa         IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    17,200.00   18,400.00   Achevé   2021-12-10   2021-12-25    2021-12-18   2021-12-28                             2021-12-30   2022-01-02   2022-04-30   2022-04-29
ble Administratif et Financier                  mergency Response                            e directe
(EMILE ASELE)

 ZR-COREF-265105-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un Spécialiste
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    17,200.00   18,400.00   Achevé   2021-12-10   2021-12-23    2021-12-18   2021-12-24                             2021-12-30   2021-12-29   2022-04-30   2022-04-29
Sénior en Passation des Marc
                                                mergency Response                            e directe
hés (Luc M. SUKADI)


 ZR-COREF-265106-CS-CDS /                       Component 3. Project and C                   Sélection de cons
Recrutement d'un Spécialiste      IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    17,200.00   18,400.00   Achevé   2021-12-10   2021-12-23    2021-12-18   2021-12-24                             2021-12-30   2021-12-29   2022-04-30   2022-04-29
sénior en Suivi & Evaluation                    mergency Response                            e directe
(Jules KWILU)

 ZR-COREF-265107-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un (e) Assista
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    11,400.00   12,400.00   Achevé   2021-12-10   2021-12-23    2021-12-18   2021-12-24                             2021-12-30   2021-12-29   2022-04-30   2022-04-29
nt (e) principal (e) de coordin
                                                mergency Response                            e directe
ation (Véronique MANYA)


 ZR-COREF-265110-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un (e) Assista
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct     6,000.00    7,000.00   Achevé   2021-12-10   2021-12-23    2021-12-18   2021-12-24                             2021-12-30   2021-12-29   2022-04-30   2022-04-29
nt (e) en Passation des marc
                                                mergency Response                            e directe
hés (Gisele MUAHUKA)


 ZR-COREF-265111-CS-INDV                        Component 3. Project and C
/ Recrutement d'un (e) Réce       IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited    4,000.00    1,000.00   Achevé   2021-12-07   2021-12-15    2021-12-21   2021-12-28   2021-12-24   2021-12-29   2021-12-30   2022-01-05   2022-04-30   2022-04-29
ptionniste                                      mergency Response


 ZR-COREF-265113-CS-CDS /                       Component 3. Project and C                   Sélection de cons
Recrutement d'un Chauffeur        IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct     3,200.00    4,000.00   Achevé   2021-12-10   2021-12-23    2021-12-18   2021-12-24                             2021-12-30   2021-12-29   2022-04-30   2022-04-29
(Jean BELO MUYUMBA)                             mergency Response                            e directe


 ZR-COREF-265253-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un Coordonat
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    28,000.00   28,000.00   Achevé   2021-12-10   2022-01-19    2021-12-18   2022-01-21                             2021-12-30   2022-01-26   2022-04-30   2022-05-07
eur de la Cellule de Suivi des
                                                mergency Response                            e directe
Projets et Programmes CSPP
(Honoré TSHIYOYO)

 ZR-COREF-265255-CS-CDS /
Recrutement d'un Coordonn                       Component 3. Project and C                   Sélection de cons
ateur Adjoint de la Cellule de    IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    20,000.00   20,000.00   Achevé   2021-12-10   2022-01-19    2021-12-18   2022-01-21                             2021-12-30   2022-01-26   2022-04-30   2022-05-07
Suivi des Projets et Program                    mergency Response                            e directe
mes CSPP ( Clément MBIKAYI
)

 ZR-COREF-265269-CS-CDS /
Recrutement d'un Chargé de
                                                Component 3. Project and C                   Sélection de cons
s Projets à la Section Appui O
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    12,000.00   12,000.00   Achevé   2021-12-10   2022-01-19    2021-12-18   2022-01-21                             2021-12-30   2022-01-26   2022-04-30   2022-05-07
pératoire '1) de la Cellule de
                                                mergency Response                            e directe
Suivi des Projets et Program
mes CSPP ( Audry KAZEMBO
LA)

 ZR-COREF-265272-CS-CDS /
Recrutement d'un Chargé de
                                                Component 3. Project and C                   Sélection de cons
s Projets à la Section Moyens
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct    12,000.00   12,000.00   Achevé   2021-12-10   2022-01-19    2021-12-18   2022-01-21                             2021-12-30   2022-01-26   2022-04-30   2022-05-07
Généraux de la Cellule de Su
                                                mergency Response                            e directe
ivi des Projets et Programme
s CSPP (GRATIAS KAYIBABU
KABUYA)




                                                                                                                                                                               Page 8
 ZR-COREF-265273-CS-CDS /
Recrutement d'un Chargé de                      Component 3. Project and C                   Sélection de cons
s Projets à la Section Fiduciai   IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct     12,000.00   12,000.00   Achevé   2021-12-10   2022-01-19    2021-12-18   2022-02-19                             2021-12-30   2022-01-26   2022-04-30   2022-05-07
re de la Cellule de Suivi des                   mergency Response                            e directe
Projets et Programmes CSPP
( Diamant EBENE)

 ZR-COREF-265276-CS-CDS /
Recrutement d'un Chargé de                      Component 3. Project and C                   Sélection de cons
s Projets à la Section Fiduciai   IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct     12,000.00   12,000.00   Achevé   2021-12-10   2022-01-19    2021-12-18   2022-01-21                             2021-12-30   2022-01-26   2022-04-30   2022-05-07
re de la Cellule des Projets et                 mergency Response                            e directe
Programmes CSPP (Lourlaine
MUANZA)

 ZR-COREF-265277-CS-CDS /
Recrutement d'un Chargé de                      Component 3. Project and C                   Sélection de cons
s Projets à la Section Appui O    IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct     12,000.00   12,000.00   Achevé   2021-12-10   2022-01-19    2021-12-18   2022-01-21                             2021-12-30   2022-01-26   2022-04-30   2022-05-07
pératoire de la Cellule de Sui                  mergency Response                            e directe
vi des Projets et Programmes
CSPP ( Samuel KAULU)

 ZR-COREF-265278-CS-CDS /
Recrutement d'un Chargé de                      Component 3. Project and C                   Sélection de cons
s Projets à la Section Fiduciai   IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct     12,000.00   12,000.00   Achevé   2021-12-10   2022-01-19    2021-12-18   2022-01-21                             2021-12-30   2022-01-26   2022-04-30   2022-05-07
re de la Cellule de Suivi des                   mergency Response                            e directe
Projets et Programmes CSPP
( Eddy MBUNGU)

 ZR-COREF-265419-CS-CDS /
                                                Component 1. Strengthenin
Sélection d'un Consultant Ind                                                                Sélection de cons
                                                g Public Resources Manage
ividuel pour appuyer la 2ème      IDA / 70200                                 A posteriori   ultants par entent   Direct     16,000.00   37,050.00   Signé    2021-12-15   2022-04-29    2021-12-25   2022-05-20                             2022-01-05   2022-06-03   2022-04-30
                                                ment at Central Governmen
phase de la mise en place de                                                                 e directe
                                                t Level
SIGMAP (20 nouvelles cellule
s)/ Pierre TSHIYOMBO

 ZR-COREF-265010-CS-INDV
                                                Component 1. Strengthenin
/ Sélection d'un consultant in
                                                g Public Resources Manage
dividuel pour la mise en plac     /                                           A posteriori   Individuel           Limited    50,000.00        0.00   Annulé   2021-12-24                 2021-12-27                2022-01-10                2022-01-30                2022-04-30
                                                ment at Central Governmen
e d'un système de gestion b
                                                t Level
udgétaire en Provinces


 ZR-COREF-265027-CS-CDS /
Sélection d'un consultant ind                   Component 2. Supporting
                                                                                             Sélection de cons
ividuel chargé d'appuyer l'él                   Resource Management at th
                                  IDA / 70200                                 A posteriori   ultants par entent   Direct     70,000.00   46,395.00   Signé    2022-01-03   2022-02-25    2022-01-11   2022-03-18                             2022-01-29   2022-04-19   2022-04-29   2022-12-30
aboration des textes fixant le                  e Provincial Government Lev
                                                                                             e directe
s modalités de répartition de                   el
s recettes à caractère nation
al (Michael WINTER)

 ZR-COREF-267867-CS-CDS /
Consultant pour l'appui à la p                  Component 1. Strengthenin
                                                                                             Sélection de cons
réparation de l'Enquête sur l                   g Public Resources Manage
                               IDA / 70200                                    A posteriori   ultants par entent   Direct    450,000.00        0.00   Signé    2021-12-27   2022-12-22    2022-01-06   2022-12-24                             2022-01-19   2023-01-06   2022-04-30
es Conditions de Vie des Mén                    ment at Central Governmen
                                                                                             e directe
ages (ECVM): Enquête sur le                     t Level
s Unités non conventionnelle
s (NSU) avec PNUD

                                                Component 3. Project and C
 ZR-COREF-270844-CS-INDV
                                  IDA / V4000   hange Management, and E       A posteriori   Individuel           Limited     6,000.00    7,000.00   Achevé   2021-12-27   2021-12-31    2022-01-01   2022-01-05   2022-01-02   2022-01-07   2022-01-08   2022-01-27   2022-04-30   2022-05-09
/ Recrutement d'un Trésorier
                                                mergency Response


 ZR-COREF-265109-CS-CDS /                       Component 3. Project and C                   Sélection de cons
Recrutement d'un (e) Trésori      /             hange Management, and E       A posteriori   ultants par entent   Direct      6,000.00        0.00   Annulé   2021-12-10                 2021-12-18                                          2021-12-30                2022-04-30
er (e) ( Sylvie NGEVESISE)                      mergency Response                            e directe


 ZR-COREF-265108-CS-CDS /                       Component 3. Project and C                   Sélection de cons
Recrutement d'un Comptabl         IDA / V4000   hange Management, and E       A posteriori   ultants par entent   Direct     10,000.00   11,000.00   Achevé   2021-12-30   2021-12-31    2022-01-03   2022-01-04                             2022-01-08   2022-01-09   2022-04-30   2022-04-29
e (Sylvie NGEVESISE)                            mergency Response                            e directe


 ZR-COREF-280723-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un Spécialiste
                               IDA / V4000      hange Management, and E       A posteriori   ultants par entent   Direct     18,000.00    9,600.00   Achevé   2022-02-23   2022-02-28    2022-02-27   2022-03-01                             2022-03-02   2022-03-17   2022-04-30   2022-05-09
en charge du suivi des donn
                                                mergency Response                            e directe
ées statistiques sur la pauvre
té (SASSE KEMBE)

 ZR-COREF-296056-CS-CDS /                       Component 1. Strengthenin
                                                                                             Sélection de cons
Sélection d'un consultant int                   g Public Resources Manage
                                  IDA / V4000                                 A posteriori   ultants par entent   Direct     50,000.00        0.00   Signé    2022-06-10   2022-06-08    2022-06-20   2022-06-18                             2022-06-28   2022-10-18   2022-09-26
ernational pour la finalisation                 ment at Central Governmen
                                                                                             e directe
du cahier des charges et du                     t Level
DAO du SiGeFiP

 ZR-COREF-264872-CS-INDV
/ Sélection d'un consultant p                   Component 1. Strengthenin
our l'évaluation de la répartit                 g Public Resources Manage
                                  /                                           A posteriori   Individuel           Limited    30,000.00        0.00   Annulé   2022-01-10                 2022-01-24                2022-01-31                2022-02-17                2022-04-18
ion effective (Etude Benefit S                  ment at Central Governmen
haring Assessment ou BSA) d                     t Level
es recettes minières au nive
au local (0.3% aux ETDs)

 ZR-COREF-265068-CS-CDS /
Sélection d'un Consultant Ex
pert en informatique et systè                   Component 1. Strengthenin
                                                                                             Sélection de cons
mes d’information chargé d’                     g Public Resources Manage
                                  /                                           A posteriori   ultants par entent   Direct     14,000.00        0.00   Annulé   2021-12-07                 2021-12-15                                          2021-12-30                2022-04-30
appuyer la mise en œuvre d                      ment at Central Governmen
                                                                                             e directe
u Système Intégré de Gestio                     t Level
n des Ressources Humaines
et de la Paie (SIGRH-Paie)! PI
ERRE TSHIYOMBO

 ZR-COREF-265080-CS-CDS /
                                                Component 1. Strengthenin
Sélection d'un Consultant int                                                                Sélection de cons
                                                g Public Resources Manage
ernational chargé de l' appui     IDA / V4000                                 A posteriori   ultants par entent   Direct    100,000.00   63,625.00   Signé    2022-05-30   2022-05-31    2022-06-07   2022-06-13                             2022-06-22   2022-07-20   2022-10-21   2023-01-11
                                                ment at Central Governmen
a la mise en œuvre du SIGRH                                                                  e directe
                                                t Level
-Paie/ GERARD VERGER


 ZR-COREF-265082-CS-CDS /
Sélection d'un Consultant ind
                                                Component 1. Strengthenin
ividuel chargé de la concepti                                                                Sélection de cons
                                                g Public Resources Manage
on et la mise en œuvre d’un       /                                           A posteriori   ultants par entent   Direct     45,000.00        0.00   Annulé   2021-12-20                 2021-12-28                                          2022-01-12                2022-04-30
                                                ment at Central Governmen
e plateforme web pour la mis                                                                 e directe
                                                t Level
e à jour du fichier de référen
ce des agents de l’Administr
ation publique (FRAP 2)/BOB
BOSEKO
 ZR-COREF-265412-CS-INDV
/ Sélection d'un Consultant In
                                                Component 3. Project and C
dividuel pour le développem
                                  /             hange Management, and E       A posteriori   Individuel           Limited    50,000.00        0.00   Annulé   2022-01-07   2022-02-16    2022-01-21                2022-01-31                2022-02-17                2022-04-18
ent , le paramétrage et la mi
                                                mergency Response
se en service du logiciel de s
tockage et analyse des donn
ées du Suivi-Evaluation

 ZR-COREF-265411-CS-INDV
/ Sélection d'un Consultant In
                                                Component 3. Project and C
dividuel pour le développem
                                  IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited    30,000.00        0.00   Annulé   2021-12-20   2022-02-23    2022-01-03                2022-01-13                2022-01-30                2022-04-30
ent, le paramétrage et la mis
                                                mergency Response
e en service du logiciel de ge
stion de projet (technique et
mise en œuvre des activités)

 ZR-COREF-265095-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Recrutement d'un Spécialiste
                               IDA / 70200      hange Management, and E       A posteriori   ultants par entent   Direct     18,000.00        0.00   Annulé   2021-12-10   2022-01-10    2021-12-18                                          2021-12-30                2022-04-30
en charge du suivi des donn
                                                mergency Response                            e directe
ées statistiques sur la pauvre
té (SASSE KEMBE)

 ZR-COREF-296648-CS-INDV
                                                Component 3. Project and C
/ Recrutement du Coordonna
                                  IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited    42,000.00        0.00   Signé    2022-06-10   2022-06-02    2022-06-24   2022-06-24   2022-07-08   2022-08-19   2022-07-21   2022-08-26   2023-07-21
teur Provincial de la province
                                                mergency Response
du Kasaï Central


 ZR-COREF-296654-CS-INDV
                                                Component 3. Project and C
/ Recrutement d'un Coordon
                                  IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited    42,000.00   38,400.00   Signé    2022-06-10   2022-06-02    2022-06-24   2022-06-24   2022-07-08   2022-07-04   2022-07-21   2022-08-23   2023-07-21
nateur Provincial pour la pro
                                                mergency Response
vince du Kasaï Oriental


 ZR-COREF-296655-CS-INDV                        Component 3. Project and C
/ Recrutement d'un Coordon        IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited    42,000.00        0.00   Signé    2022-06-10   2022-06-02    2022-06-24   2022-06-24   2022-07-08   2022-08-19   2022-07-21   2022-08-26   2023-07-21
nateur provincial pour la pro                   mergency Response
vince de Lomami

 ZR-COREF-296656-CS-INDV                        Component 3. Project and C
/ Recrutement d'un Coordon        IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited    42,000.00   38,400.00   Signé    2022-06-10   2022-06-02    2022-06-24   2022-06-24   2022-07-08   2022-07-15   2022-07-21   2022-08-23   2023-07-21
nateur provincial pour la pro                   mergency Response
vince du Kasaï

 ZR-COREF-296657-CS-INDV
                                                Component 3. Project and C
/ Recrutement d'un Assistant
                                  IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited    24,000.00        0.00   Signé    2022-06-15   2022-06-02    2022-06-29   2022-06-24   2022-07-13   2022-08-20   2022-07-26   2022-08-27   2023-07-26
Provincial chargé de l'Admini
                                                mergency Response
stration et Finances de la Pro
vince du Kasaï Central

 ZR-COREF-296661-CS-INDV
/ Recrutement de l'Assistant                    Component 3. Project and C
Provincial Chargé de l'Admini     IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited    24,000.00        0.00   Signé    2022-06-15   2022-06-02    2022-06-29   2022-06-24   2022-07-13   2022-08-20   2022-07-26   2022-08-27   2023-07-26
stration et Finances de la pro                  mergency Response
vince du Kasaï Oriental




                                                                                                                                                                                Page 9
 ZR-COREF-296662-CS-INDV
                                               Component 3. Project and C
/ Recrutement de l'Assistant
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             24,000.00        0.00   Signé               2022-06-15   2022-06-02     2022-06-29   2022-06-24   2022-07-13   2022-08-20   2022-07-26   2022-08-27   2023-07-26
Provincial chargé de l'Admini
                                               mergency Response
stration et Finances de la pro
vince de Lomami

 ZR-COREF-296665-CS-INDV
                                               Component 3. Project and C
/ Recrutement de l'Assistant
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             24,000.00        0.00   Signé               2022-06-15   2022-06-08     2022-06-29   2022-06-24   2022-07-13   2022-08-20   2022-07-26   2022-08-27   2023-07-26
Provincial chargé de l'Admini
                                               mergency Response
stration et Finances de la pro
vince du Kasaï

 ZR-COREF-298958-CS-INDV
                                               Component 3. Project and C
/ Sélection d'un Consultant S
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             51,600.00   55,200.00   Signé               2022-06-15   2022-06-08     2022-06-20   2022-06-23   2022-07-04   2022-07-27   2022-07-25   2022-08-10   2023-07-20
pécialiste en Passation des
                                               mergency Response
marchés du Projet ENCORE


 ZR-COREF-305471-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'Un Deuxièm
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             54,180.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-09-15   2022-08-27   2023-04-04   2022-09-13   2023-04-14   2023-09-13
e Spécialiste en SUivi Evalua
                                               mergency Response
tion du Projet ENCORE


 ZR-COREF-305481-CS-INDV                       Component 3. Project and C
/ Recrutement d'un (e) Charg     IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             31,500.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-09-13   2022-09-03   2022-09-29   2022-09-24   2022-10-06   2023-09-24
é (e) de Communication du P                    mergency Response
rojet ENCORE

 ZR-COREF-305484-CS-INDV                       Component 3. Project and C
/ Recrutement d'un (e) Tréso     IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             18,900.00        0.00   Signé               2022-08-10   2022-08-17     2022-08-17   2022-09-13   2022-08-31   2022-09-23   2022-09-26   2022-09-30   2022-11-01
rier (e) du Projet ENCORE                      mergency Response


 ZR-COREF-305485-CS-INDV                       Component 3. Project and C
/ Recrutement d'un (e) Caissi    IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             15,000.00        0.00   Signé               2022-08-10   2022-08-17     2022-08-17   2022-09-23   2022-08-31   2022-09-29   2022-09-26   2022-10-06   2023-09-26
er (e) du Projet ENCORE                        mergency Response


 ZR-COREF-305486-CS-INDV                       Component 3. Project and C
/ Recrutement d'un Comptab       IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             31,500.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-09-14   2022-09-10   2022-09-29   2022-10-15   2022-10-06   2023-10-15
le Pour le Projet ENCORE                       mergency Response


 ZR-COREF-305499-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'un Chauffeu
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             12,600.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-09-13   2022-08-27   2022-09-23   2022-09-15   2022-09-30   2023-09-15
r coursier de la Coordination
                                               mergency Response
du Projet ENCORE


 ZR-COREF-305502-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'un Deuxièm
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             10,800.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-09-13   2022-08-27   2022-09-23   2022-09-15   2022-09-30   2023-09-15
e Chauffeur Coursier de la C
                                               mergency Response
oordination du Projet ENCOR
E

 ZR-COREF-305512-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'un (e) Réce
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             12,600.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-29   2022-09-13   2022-09-01   2022-09-23   2022-09-07   2022-09-30   2023-09-07
ptionniste de la Coordination
                                               mergency Response
Nationale du Projet ENCORE


 ZR-COREF-305514-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'un (e) deuxi
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             12,600.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-29   2022-09-13   2022-09-01   2022-09-23   2022-09-07   2022-09-30   2023-09-07
ème Réceptionniste de la Co
                                               mergency Response
ordination Nationale du proje
t ENCORE

 ZR-COREF-305517-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'un (e) Spéci                                                                                                                                En cours d'exécut
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             56,700.00        0.00                       2022-08-15   2023-04-12     2022-08-20                2022-09-03                2022-09-24                2023-09-24
aliste chargé des systèmes d                                                                                                                                ion
                                               mergency Response
'information du Projet ENCOR
E

 ZR-COREF-305522-CS-INDV
/ Recrutement d'un (e) Spéci                   Component 3. Project and C
aliste en charge de la réform    IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             56,700.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-09-23   2022-09-03   2022-09-29   2022-09-24   2022-10-06   2023-09-24
e de l'Administration fiscale                  mergency Response
et gestion des revenus minie
rs

 ZR-COREF-305531-CS-INDV
/ Recrutement d'un (e) Spéci                   Component 3. Project and C
aliste en charge de la surveill IDA / 70200    hange Management, and E      A posteriori   Individuel           Limited             56,700.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-08-22   2022-09-10   2022-09-29   2022-10-01   2022-10-06   2023-10-01
ance des risques budgétaires                   mergency Response
liés à la gestion des Entrepris
es publiques

 ZR-COREF-305540-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'un Spécialis
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             54,180.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-09-15   2022-09-03   2022-11-22   2022-09-24   2022-12-25   2022-10-30
te en Charge des questions d
                                               mergency Response
es Violences basées sur le ge
nre

 ZR-COREF-305547-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'un (e) Spéci
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             54,180.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-09-15   2022-09-03   2022-11-22   2022-09-24   2022-12-07   2023-09-24
aliste en sauvegarde environ
                                               mergency Response
nementale et sociale du proj
et ENCORE

 ZR-COREF-305557-CS-INDV                       Component 3. Project and C
                                                                                                                                                            En cours d'exécut
/ Recrutement d'un Assistant     IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             18,900.00        0.00                       2022-08-15   2023-07-14     2022-08-20                2022-09-03                2022-09-24                2023-09-24
                                                                                                                                                            ion
IT                                             mergency Response


 ZR-COREF-305561-CS-INDV
                                               Component 3. Project and C
/ Recrutement d'un (e) Assist
                                 IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             25,200.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-08-22   2022-09-03   2022-08-29   2022-09-24   2022-09-06   2023-09-24
ant (e) en décentralisation fi
                                               mergency Response
nancière et Budget Participat
if

 ZR-COREF-305564-CS-INDV
/ Recrutement d'un Spécialis                   Component 3. Project and C
te en charge de la gestion du    IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited             56,700.00        0.00   Signé               2022-08-15   2022-08-17     2022-08-20   2022-08-26   2022-09-03   2022-08-30   2022-09-24   2022-09-06   2023-09-24
changement et du Budget Pa                     mergency Response
rticipatif du projet ENCORE


 ZR-COREF-305496-CS-CDS /
                                               Component 3. Project and C                  Sélection de cons
Renouvellement contrat du C
                                 IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National    9,600.00   12,000.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
hauffeur de la Coordination
                                               mergency Response                           e directe
Nationale du Projet ENCORE
- BELO MUYUMBA

 ZR-COREF-305107-CS-CDS /
                                               Component 3. Project and C                  Sélection de cons
Renouvellement du contrat d
                                IDA / 70200    hange Management, and E      A posteriori   ultants par entent   Direct - National   54,000.00   57,600.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
u Spécialiste en charge du co
                                               mergency Response                           e directe
ntrôle interne et externe - Eti
enne Mafweni

 ZR-COREF-305468-CS-CDS /
                                               Component 3. Project and C                  Sélection de cons
Renouvellement du Contrat
                                 IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National   51,600.00   55,200.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
du Responsable Administratif
                                               mergency Response                           e directe
et Financier (RAF) du Projet E
NCORE - Emile ASELE

 ZR-COREF-305470-CS-CDS /
                                               Component 3. Project and C                  Sélection de cons
Renouvellement Contrat du
                                 IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National   51,600.00   55,200.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
Spécialiste en Suivi Evaluatio
                                               mergency Response                           e directe
n du Projet ENCORE - Jules K
WILU

 ZR-COREF-305098-CS-CDS /
Renouvellement du Contrat                      Component 3. Project and C                  Sélection de cons
du Spécialiste en charge de l    IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National   54,000.00   57,600.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
a Réforme du système de la                     mergency Response                           e directe
comptabilité et gestion de la
trésorerie - Robert Bamba

 ZR-COREF-305478-CS-CDS /
                                               Component 3. Project and C                  Sélection de cons
Renouvellement contrat de l'
                                 IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National   34,200.00   37,800.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
Assistante Principale du Proj
                                               mergency Response                           e directe
et ENCORE (APP) - Véronique
MANYA

 ZR-COREF-305112-CS-CDS /
Renouvellement du contrat d                    Component 3. Project and C                  Sélection de cons
u Spécialiste en charge du su IDA / 70200      hange Management, and E      A posteriori   ultants par entent   Direct - National   54,000.00   57,600.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
ivi des données statistiques s                 mergency Response                           e directe
ur la Pauvreté du Projet ENC
ORE - Sasse Kembe

 ZR-COREF-305110-CS-CDS /
Renouvellement du Contrat
                                               Component 3. Project and C                  Sélection de cons
du Spécialiste en charge de l
                                 IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National   54,000.00   57,600.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
a réforme du système des m
                                               mergency Response                           e directe
archés publics et gestion de l
a dépense - Jean Baptiste VE
KO

 ZR-COREF-305483-CS-CDS /
                                               Component 3. Project and C                  Sélection de cons
Recrutement Chargée de Pas
                                 IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National   36,000.00   39,600.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
sation des Marchés du Projet
                                               mergency Response                           e directe
ENCORE (Gisèle MUAHUKA)




                                                                                                                                                                                                  Page 10
 ZR-COREF-305090-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Renouvellement Contrat du
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct - National      84,000.00   88,800.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
Coordonnateur National du P
                                                mergency Response                            e directe
rojet ENCORE - Godefroid MI
SENGA MILABYO

 ZR-COREF-305094-CS-CDS /
                                                Component 3. Project and C                   Sélection de cons
Renouvellement du Contrat
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct - National      54,000.00   57,600.00   Signé               2022-07-25   2022-08-19     2022-07-28   2022-08-19                             2022-08-02   2022-08-23   2024-08-01
Spécialiste en charge de la D
                                                mergency Response                            e directe
écentralisation financière - M
oise ASSANI

 ZR-COREF-310943-CS-INDV
/ Selection d'un consultant in
                                                Component 1. Strengthenin
ternational expert en sondag
                                                g Public Resources Manage
e pour 4 mois chargé d'acco       IDA / 70200                                 A posteriori   Individuel           Limited                40,000.00        0.00   Signé               2022-08-31   2022-08-19     2022-09-03   2022-08-24   2022-09-08   2022-11-28   2022-09-15   2022-12-09   2023-01-13
                                                ment at Central Governmen
mpagner l'équipe technique
                                                t Level
national dans l'organisation
de l'enquête et l'actualisatio
n de la base d'échantilllonna
ge
 ZR-COREF-344138-CS-INDV
/ Recrutement d'un Consulta
nt National pour assurer la fo
                                                Component 1. Strengthenin
rmation des agents des servi
                                                g Public Resources Manage                                                                                        En cours d'exécut
ces d'assiette et de recouvre     IDA / 70200                                 A posteriori   Individuel           Open - National        70,000.00        0.00                       2023-03-18   2023-04-10     2023-04-27                2023-05-18                2023-06-22                2023-12-19
                                                ment at Central Governmen                                                                                        ion
ment (DGRAD et administrati
                                                t Level
ons de mines) sur la maitrise
de l'assiette de la redevance
minière dans les 5 sites mini
ers de la RDC : Kinshasa, H

 ZR-COREF-344146-CS-INDV
/ Recrutement d'un Consulta
nt International pour assurer
                                                Component 1. Strengthenin
la formation à Kinshasa sur l
                                                g Public Resources Manage                                         Open - Internationa                            En cours d'exécut
a chaîne de valeur de l'indus     IDA / 70200                                 A posteriori   Individuel                                 100,000.00        0.00                       2023-03-15   2023-04-10     2023-04-24                2023-05-15                2023-06-19                2023-12-16
                                                ment at Central Governmen                                         l                                              ion
trie extractive minière, sur le
                                                t Level
s spécificités comptable et l
a Fiscalité du secteur des mi
nes (DGI) des vérificateurs pr
ovenant des 5 sites mi

 ZR-COREF-344209-CS-INDV
                                                Component 1. Strengthenin
/ Recrutement des deux (02)
                                                g Public Resources Manage                                                                                        En cours d'exécut
consultants individuels pour      IDA / 70200                                 A posteriori   Individuel           Open - National        60,000.00        0.00                       2023-03-03   2023-10-02     2023-03-24                2023-04-07                2023-05-12                2023-11-08
                                                ment at Central Governmen                                                                                        ion
la mise à jour des guides d’él
                                                t Level
aboration du PEB et du PTR e
n lien avec le PPM

 ZR-COREF-344299-CS-INDV                        Component 1. Strengthenin
/ Recrutement d'un consulta                     g Public Resources Manage                                                                                        En attente d'exéc
                                  IDA / 70200                                 A posteriori   Individuel           Open - National        30,000.00        0.00                       2023-07-03                  2023-08-12                2023-08-26                2023-09-30                2024-03-28
nt individuel pour la producti                  ment at Central Governmen                                                                                        ution
on du guide de contrôle bud                     t Level
gétaire

 ZR-COREF-344310-CS-INDV
                                                Component 1. Strengthenin
/ Recrutement d'un consulta
                                                g Public Resources Manage                                                                                        En attente d'exéc
nt individuel pour la producti    IDA / 70200                                 A posteriori   Individuel           Open - National        30,000.00        0.00                       2023-10-02                  2023-11-20                2023-12-11                2024-01-15                2024-07-13
                                                ment at Central Governmen                                                                                        ution
on du projet de plan de renfo
                                                t Level
rcement des capacités des c
ontrôleurs budgétaires

 ZR-COREF-344314-CS-INDV
/ Recrutement d'un consulta
                                                Component 1. Strengthenin
nt international devant mene
                                                g Public Resources Manage                                         Open - Internationa                            En attente d'exéc
r une étude de faisabilité sur    IDA / 70200                                 A posteriori   Individuel                                  70,000.00        0.00                       2023-03-20                  2023-05-08                2023-05-29                2023-07-03                2023-12-30
                                                ment at Central Governmen                                         l                                              ution
la mise en place du Compte
                                                t Level
Unique du Trésor et son arch
itecture favorable au cadre i
nstitutionnel de la RDC

 ZR-COREF-344350-CS-INDV
                                                Component 1. Strengthenin
/ Recrutement d'un consulta
                                                g Public Resources Manage                                         Open - Internationa                            En cours d'exécut
nt International chargé d'opti    IDA / 70200                                 A posteriori   Individuel                                 100,000.00        0.00                       2023-03-22   2023-04-24     2023-05-10                2023-05-31                2023-07-05                2024-01-01
                                                ment at Central Governmen                                         l                                              ion
miser les macro-processus d
                                                t Level
e gestion des ressources hu
maines et de la paie

 ZR-COREF-344399-CS-INDV
/ Recrutement d'un consulta                     Component 1. Strengthenin
nt International pour les Etud                  g Public Resources Manage                                         Open - Internationa                            En attente d'exéc
                                  IDA / 70200                                 A posteriori   Individuel                                  60,000.00        0.00                       2023-03-10                  2023-04-28                2023-05-19                2023-06-23                2023-12-20
es de faisabilités relatives au                 ment at Central Governmen                                         l                                              ution
réseau étendu en fibre optiq                    t Level
ue et boucle radio local de l’
Administration Publique

 ZR-COREF-344421-CS-INDV
                                                Component 1. Strengthenin
/ Recrutement d'un consulta
                                                g Public Resources Manage                                                                                        En attente d'exéc
nt individuel pour accompag       IDA / 70200                                 A posteriori   Individuel           Limited                40,000.00        0.00                       2023-03-29                  2023-04-03                2023-04-24                2023-05-29                2023-07-13
                                                ment at Central Governmen                                                                                        ution
ner le processus de sélection
                                                t Level
de l'Assistance en maitrise d'
ouvrage du SiGeFiP

 ZR-COREF-344445-CS-INDV
/ Recrutement d'un consulta
                                                Component 1. Strengthenin
nt international chargé de l'a
                                                g Public Resources Manage                                         Open - Internationa                            En cours d'exécut
ssistance technique à l'ARMP      IDA / 70200                                 A posteriori   Individuel                                  70,000.00        0.00                       2023-04-03   2023-07-31     2023-05-22                2023-06-12                2023-07-17                2023-09-15
                                                ment at Central Governmen                                         l                                              ion
pour la révision du cadre juri
                                                t Level
dique des marchés publics e
n tenant compte de la démat
érialisation du processus

 ZR-COREF-344466-CS-INDV
/ Recrutement d'un consulta                     Component 1. Strengthenin
nt international chargé de la                   g Public Resources Manage                                         Open - Internationa                            En attente d'exéc
                                  IDA / 70200                                 A posteriori   Individuel                                  80,000.00        0.00                       2023-03-30                  2023-04-20                2023-05-11                2023-06-15                2023-08-14
formation des auditeurs de l'                   ment at Central Governmen                                         l                                              ution
ARMP en MP et PPP ainsi que                     t Level
la redaction du manuel de pr
ocedures des audits.

 ZR-COREF-344495-CS-INDV                        Component 1. Strengthenin
                                                                                                                                                                 En attente d'exéc
/ Recrutement d'un webmast        IDA / 70200   g Public Resources Manage     A posteriori   Individuel           Limited                50,000.00        0.00                       2023-04-01                  2023-04-06                2023-04-27                2023-06-01                2023-07-31
                                                                                                                                                                 ution
er pour l'audit du site web du                  ment at Central Governmen
CSP                                             t Level

 ZR-COREF-344499-CS-INDV
                                                Component 1. Strengthenin
/ Recrutement d'un web mas
                                                g Public Resources Manage                                                                                        En cours d'exécut
ter pour développement du s       IDA / 70200                                 A posteriori   Individuel           Open - National        50,000.00        0.00                       2023-03-17   2023-12-07     2023-05-05                2023-05-26                2023-06-30                2023-12-27
                                                ment at Central Governmen                                                                                        ion
ite web du Ministère du Porte
                                                t Level
feuille conformément au pla
n national de numérisation

 ZR-COREF-344503-CS-INDV
/ Recrutement d'un Web Mas
                                                Component 1. Strengthenin
ter pour le développement d’
                                                g Public Resources Manage                                                                                        En cours d'exécut
un portail au niveau des entr IDA / 70200                                     A posteriori   Individuel           Open - National        50,000.00        0.00                       2023-03-14   2023-04-11     2023-04-23                2023-05-14                2023-06-18                2023-12-15
                                                ment at Central Governmen                                                                                        ion
eprises sur les informations à
                                                t Level
collecter et à échanger avec
possibilité d’interaction en li
gne avec le CSP.

 ZR-COREF-344514-CS-INDV
/ Recrutement d'un consulta                     Component 1. Strengthenin
nt pour l’élaboration d’un ma                   g Public Resources Manage                                                                                        En cours d'exécut
                                  IDA / 70200                                 A posteriori   Individuel           Open - National        50,000.00        0.00                       2023-04-10   2023-05-20     2023-05-29                2023-06-19                2023-07-24                2023-10-22
nuel des procédures en mati                     ment at Central Governmen                                                                                        ion
ère de contrôle et audit des                    t Level
entreprises publiques et étab
lissements publics

 ZR-COREF-344517-CS-INDV                        Component 1. Strengthenin
/ Recrutement d'un consulta                     g Public Resources Manage                                                                                        En cours d'exécut
                                  IDA / 70200                                 A posteriori   Individuel           Open - National        50,000.00        0.00                       2023-04-17   2023-05-20     2023-06-05                2023-06-26                2023-07-31                2024-01-27
nt pour la production du proj                   ment at Central Governmen                                                                                        ion
et de la stratégie du Portefeu                  t Level
ille

 ZR-COREF-344749-CS-INDV
                                                Component 1. Strengthenin
/ Recrutement d'un consulta
                                                g Public Resources Manage                                                                                        En attente d'exéc
nt national pour la productio     IDA / 70200                                 A posteriori   Individuel           Open - National        50,000.00        0.00                       2023-04-01                  2023-05-20                2023-06-10                2023-07-15                2023-09-13
                                                ment at Central Governmen                                                                                        ution
n des contrats de concession
                                                t Level
type des biens du domaine p
ublic de l'Etat

 ZR-COREF-344774-CS-INDV
/ Recrutement des consultan
ts nationaux pour mener l'an
                                                Component 2. Supporting
alyse des états de suivi budg
                                                Resource Management at th                                                                                        En cours d'exécut
étaires (ESB) trimestriels et s   IDA / 70200                                 A posteriori   Individuel           Open - National        80,000.00        0.00                       2023-05-08   2023-08-31     2023-06-26                2023-07-17                2023-08-21                2024-02-17
                                                e Provincial Government Lev                                                                                      ion
emestriels des secteurs pro
                                                el
pauvres (Education, Santé, M
ines, Agriculture et développ
ement rural, Energie, Sécurit
é, Infrastructures) et le ge

 ZR-COREF-344786-CS-INDV
/ Recrutement de consultant                     Component 1. Strengthenin
s nationaux pour la formatio                    g Public Resources Manage                                                                                        En cours d'exécut
                                  IDA / 70200                                 A posteriori   Individuel           Open - National        70,000.00        0.00                       2023-03-30   2023-04-10     2023-05-18                2023-06-08                2023-07-13                2024-01-09
n des services concernés à la                   ment at Central Governmen                                                                                        ion
production et à la publication                  t Level
des documents budgétaires-
clés nationaux




                                                                                                                                                                                                       Page 11
 ZR-COREF-344812-CS-INDV
/ Recrutement du consultant
individuel chargé réaliser les                    Component 1. Strengthenin
études, la production du DA                       g Public Resources Manage                                                                                      En attente d'exéc
                                    IDA / 70200                                 A posteriori   Individuel           Open - National         100,000.00    0.00                       2023-03-27                  2023-05-15                2023-06-05   2023-07-10                2024-01-06
O ainsi que le contrôle et sur                    ment at Central Governmen                                                                                      ution
veillance des travaux de réh                      t Level
abilitation du bâtiment deva
nt abriter la chambre des co
mptes déconcentrées de Kan
anga
 ZR-COREF-344837-CS-INDV
/ Recrutement d'un consulta                       Component 2. Supporting
nt international pour la réalis                   Resource Management at th                                         Open - Internationa                          En cours d'exécut
                                    IDA / 70200                                 A posteriori   Individuel                                   120,000.00    0.00                       2023-03-20   2023-04-10     2023-05-08                2023-05-29   2023-07-03                2023-12-30
ation de l'évaluation de la p                     e Provincial Government Lev                                       l                                            ion
erformance des administrati                       el
ons fiscales provinciales suiv
ant l'approche TADAT.

 ZR-COREF-344901-CS-INDV
/ Recrutement d'un consulta
                                                  Component 2. Supporting
nt ingénieur architecte pour f
                                                  Resource Management at th                                                                                      En attente d'exéc
aire l'état des lieux et le suivi   IDA / 70200                                 A posteriori   Individuel           Open - National         150,000.00    0.00                       2023-04-08                  2023-05-27                2023-06-17   2023-07-22                2024-01-18
                                                  e Provincial Government Lev                                                                                    ution
des bâtiments à réhabiliter d
                                                  el
ans les 4 provinces (du Kasaï
Oriental, du Kasaï, du Kasaï
Central et de Lomami)

 ZR-COREF-344912-CS-CDS /
Déploiement multi-sites du lo                     Component 3. Project and C                   Sélection de cons
                                                                                                                    Direct - Internation                         En attente d'exéc
giciel de gestion financière d IDA / 70200        hange Management, and E       A posteriori   ultants par entent                            40,000.00    0.00                       2023-04-15                  2023-04-25                             2023-06-29                2023-12-26
                                                                                                                    al                                           ution
u projet ENCORE (auprès de                        mergency Response                            e directe
TOMATE) et mise à niveau


 ZR-COREF-345018-CS-INDV                          Component 3. Project and C
                                                                                                                                                                 En cours d'exécut
/ Recrutement d'un auditeur         IDA / 70200   hange Management, and E       A posteriori   Individuel           Open - National          60,000.00    0.00                       2023-03-10   2023-03-16     2023-04-19                2023-05-10   2023-06-14                2024-06-13
                                                                                                                                                                 ion
interne                                           mergency Response


 ZR-COREF-345068-CS-INDV
/ Recrutement d'un consulta
nt pour traduire un documen                       Component 3. Project and C
                                                                                                                                                                 En cours d'exécut
t synthèse sur le projet en la      IDA / 70200   hange Management, and E       A posteriori   Individuel           Open - National          20,000.00    0.00                       2023-04-14   2023-12-07     2023-06-02                2023-06-23   2023-07-28                2024-01-24
                                                                                                                                                                 ion
ngues locales (résumé du pr                       mergency Response
ojet : son envergure, ses risq
ues et effets environnement
ales et sociale)

 ZR-COREF-345081-CS-INDV
/ Recrutement d'un consulta
                                                  Component 3. Project and C
nt individuel pour l'élaboratio                                                                                                                                  En cours d'exécut
                                    IDA / 70200   hange Management, and E       A posteriori   Individuel           Open - National          30,000.00    0.00                       2023-03-21   2023-04-24     2023-05-09                2023-05-30   2023-07-04                2023-12-31
n de la stratégie de gestion d                                                                                                                                   ion
                                                  mergency Response
u changement et la revue qu
alité de la stratégie de comm
unication

 ZR-COREF-345087-CS-INDV
                                                  Component 3. Project and C
/ Recrutement des consultan                                                                                                                                      En attente d'exéc
                               IDA / 70200        hange Management, and E       A posteriori   Individuel           Open - National          50,000.00    0.00                       2023-04-07                  2023-05-26                2023-06-16   2023-07-21                2024-01-17
ts ponctuels pour les évaluati                                                                                                                                   ution
                                                  mergency Response
ons des offres et proposition
s

 ZR-COREF-345088-CS-INDV                          Component 3. Project and C
                                                                                                                                                                 En cours d'exécut
/ Recrutement de deux comp          IDA / 70200   hange Management, and E       A posteriori   Individuel           Open - National          79,200.00    0.00                       2023-03-28   2023-03-17     2023-05-16                2023-06-06   2023-07-11                2024-07-10
                                                                                                                                                                 ion
tables pour le projet ENCORE                      mergency Response


 ZR-COREF-345092-CS-INDV                          Component 1. Strengthenin
/ Recrutement d'un consulta                       g Public Resources Manage                                                                                      En attente d'exéc
                                    IDA / 70200                                 A posteriori   Individuel           Open - National         100,000.00    0.00                       2023-04-18                  2023-06-06                2023-06-27   2023-08-01                2024-01-28
nt pour une assistance techn                      ment at Central Governmen                                                                                      ution
ique dans la fiscalité minière                    t Level


 ZR-COREF-344362-CS-INDV
                                                  Component 1. Strengthenin
/ Recrutement d'un consulta
                                                  g Public Resources Manage                                                                                      En attente d'exéc
nt national pour l'élaboration      IDA / 70200                                 A posteriori   Individuel           Open - National         100,000.00    0.00                       2023-03-17                  2023-05-05                2023-05-26   2023-06-30                2023-12-27
                                                  ment at Central Governmen                                                                                      ution
du manuel de procédures de
                                                  t Level
gestion des ressources huma
ines et la Paie

 ZR-COREF-344827-CS-CDS /                         Component 1. Strengthenin                    Sélection de cons
Appui à l'Organisation de l’e       IDA / 70200   g Public Resources Manage     A priori       ultants par entent   Direct - National      9,607,330.00   0.00   Signé               2023-03-15   2023-04-28     2023-03-25   2023-05-18                2023-05-29   2023-03-30   2023-11-25
nquête ECVM proprement dit                        ment at Central Governmen                    e directe
e avec le PNUD                                    t Level

 ZR-COREF-344384-CS-INDV
/ Recrutement consultant ind
ividuel pour élaborer le cahie
                                                  Component 1. Strengthenin
r des charges et le DAO pour
                                                  g Public Resources Manage                                                                                      En attente d'exéc
l'installation, la sécurisation     IDA / 70200                                 A posteriori   Individuel           Limited                  30,000.00    0.00                       2023-03-13                  2023-03-18                2023-04-08   2023-05-13                2023-11-09
                                                  ment at Central Governmen                                                                                      ution
et la mise en marche du data
                                                  t Level
center de secours de la Direc
tion de la Gestion des bases
des données des RH à la fon
ction publique (DBDR).

 ZR-COREF-344845-CS-INDV
                                                  Component 2. Supporting
/ Recrutement d'un cabinet p
                                                  Resource Management at th                                         Open - Internationa
our mener une étude sur le p        IDA / 70200                                 A priori       Individuel                                   600,000.00    0.00   Annulé              2023-03-31                  2023-05-19                2023-06-09   2023-07-14                2024-01-10
                                                  e Provincial Government Lev                                       l
otentiel fiscal en faveur de q
                                                  el
uatre provinces ENCORE


 ZR-COREF-344484-CS-INDV
                                                  Component 1. Strengthenin
/ Recrutement du consultant                                                                    Sélection de cons
                                                  g Public Resources Manage                                                                                      En attente d'exéc
individuel Expert Pierre Tshiy      IDA / 70200                                 A posteriori   ultants par entent   Direct - National        50,000.00    0.00                       2023-03-24                  2023-04-03                             2023-06-07                2023-12-04
                                                  ment at Central Governmen                                                                                      ution
ombo pour l'assistance techn                                                                   e directe
                                                  t Level
ique dans la phase de produ
ction du SIGMAP

 ZR-COREF-355174-CS-INDV
                                                  Component 3. Project and C
/ Recrutement d'un(e) assist                                                                                                                                     En cours d'exécut
                                    IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited                  30,000.00    0.00                       2023-05-01   2023-04-24     2023-05-06                2023-05-20   2023-06-10                2024-06-09
ant(e) en décentralisation fin                                                                                                                                   ion
                                                  mergency Response
ancière et budget participatif


 ZR-COREF-355179-CS-INDV
                                                  Component 3. Project and C
/ Recrutement d'un spécialist                                                                                                                                    En attente d'exéc
                                    IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited                  56,700.00    0.00                       2023-05-01                  2023-05-06                2023-05-27   2023-07-01                2023-12-28
e en charge de la reforme de                                                                                                                                     ution
                                                  mergency Response
la fonction publique pour le P
rojet ENCORE

 ZR-COREF-355180-CS-INDV                          Component 1. Strengthenin
/ Recrutement d'un consulta                       g Public Resources Manage                                                                                      En cours d'exécut
                                    IDA / 70200                                 A posteriori   Individuel           Limited                  56,700.00    0.00                       2023-04-15   2023-05-23     2023-04-20                2023-05-11   2023-06-15                2023-12-12
nt national Expert en Mine p                      ment at Central Governmen                                                                                      ion
our le projet ENCORE                              t Level


 ZR-COREF-355425-CS-INDV
                                                  Component 3. Project and C
/ Recrutement d'un 2ème sp                                                                                                                                       En cours d'exécut
                                    IDA / 70200   hange Management, and E       A posteriori   Individuel           Limited                  55,200.00    0.00                       2023-04-15   2023-04-11     2023-04-20                2023-05-11   2023-06-15                2023-12-12
écialiste en Passation des Ma                                                                                                                                    ion
                                                  mergency Response
rchés du Projet ENCORE


 ZR-COREF-345715-CS-INDV                          Component 1. Strengthenin
                                                                                                                                                                 En cours d'exécut
/ Assistance technique à l'AR       IDA / 70200   g Public Resources Manage     A posteriori   Individuel           Open - National         200,000.00    0.00                       2023-05-10   2023-07-20     2023-06-28                2023-07-19   2023-08-23                2024-02-19
                                                                                                                                                                 ion
MP pour la mise en œuvre de                       ment at Central Governmen
s réformes                                        t Level

 ZR-COREF-345701-CS-INDV                          Component 3. Project and C
/ Recrutement d'un chargé d         IDA / 70200   hange Management, and E       A posteriori   Individuel           Open - National          40,000.00    0.00   Annulé              2023-04-29   2023-03-17     2023-05-20                2023-06-10   2023-07-15                2024-07-14
e Passation des Marchés                           mergency Response


 ZR-COREF-356313-CS-INDV                          Component 3. Project and C
                                                                                                                                                                 En attente d'exéc
/ Recrutement d'un expert fis       IDA / 70200   hange Management, and E       A posteriori   Individuel           Open - National          56,700.00    0.00                       2023-04-12                  2023-05-31                2023-06-21   2023-07-26                2024-01-22
                                                                                                                                                                 ution
caliste pour le projet ENCOR                      mergency Response
E

 ZR-COREF-363418-CS-CDS /
                                                  Component 3. Project and C                   Sélection de cons
Recrutement d'un consultant                                                                                         Direct - Internation                         En attente d'exéc
                                    IDA / 70200   hange Management, and E       A posteriori   ultants par entent                           350,000.00    0.00                       2023-05-27                  2023-06-06                             2023-08-10                2024-02-06
firme chargé de l'audit des d                                                                                       al                                           ution
                                                  mergency Response                            e directe
épenses éligibles au progra
mme (PDE)

 ZR-COREF-363431-CS-INDV
/ Recrutement d'un consulta
                                                  Component 1. Strengthenin
nt Senior International pour l'
                                                  g Public Resources Manage                                         Open - Internationa                          En cours d'exécut
élaboration de la stratégie d       IDA / 70200                                 A posteriori   Individuel                                   100,000.00    0.00                       2023-05-29   2023-07-13     2023-07-17                2023-08-07   2023-09-11                2024-03-09
                                                  ment at Central Governmen                                         l                                            ion
e renforcement des capacité
                                                  t Level
s, de formation et de professi
onnalisation des acteurs nati
onaux de la commande Publi
que.
 ZR-COREF-371824-CS-CDS /
                                                  Component 3. Project and C                   Sélection de cons
Recrutement d'un Coordonn                                                                                                                                        En cours d'exécut
                                    IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct - National        64,200.00    0.00                       2023-08-30   2023-09-23     2023-09-09                             2023-11-13                2024-05-11
ateur Adjoint                                                                                                                                                    ion
                                                  mergency Response                            e directe
Mme BULEMI NKULU Angelin
e

 ZR-COREF-378709-CS-INDV
                                                  Component 1. Strengthenin
/ Recrutement d’un consulta
                                                  g Public Resources Manage                                                                                      En attente d'exéc
nt national pour l’étude préal      IDA / 70200                                 A posteriori   Individuel           Limited                 100,000.00    0.00                       2023-09-18                  2023-09-23                2023-10-14   2023-11-18                2024-05-16
                                                  ment at Central Governmen                                                                                      ution
able à la mise en place du sy
                                                  t Level
stème d’information compta
ble




                                                                                                                                                                                                       Page 12
 ZR-COREF-378711-CS-INDV
/ Recrutement d'un consulta                      Component 1. Strengthenin
nt international pour mener                      g Public Resources Manage                                                                                   En attente d'exéc
                                   IDA / 70200                                A posteriori   Individuel           Limited                100,000.00   0.00                       2023-09-21                  2023-09-26                2023-10-17                2023-11-21   2024-05-19
une étude relative à la mise                     ment at Central Governmen                                                                                   ution
en place d'une solution infor                    t Level
matique nécessaire au foncti
onnement du CUT

 ZR-COREF-379000-CS-INDV
/ Recrutement d'un consulta
                                                 Component 1. Strengthenin
nt international expert en CA
                                                 g Public Resources Manage                                                                                   En cours d'exécut
PI pour 2 mois chargé d’acco       IDA / 70200                                A posteriori   Individuel           Limited                 70,000.00   0.00                       2023-10-02   2023-09-22     2023-10-07                2023-10-28                2023-12-02   2024-05-30
                                                 ment at Central Governmen                                                                                   ion
mpagner l’équipe technique
                                                 t Level
nationale dans l'organisation
de l'enquête et l'actualisatio
n de la base d'échantillonnag
e (ECVM)
 ZR-COREF-379010-CS-CDS /
                                                 Component 1. Strengthenin
Recrutement d'un consultant                                                                  Sélection de cons
                                                 g Public Resources Manage                                                                                   En cours d'exécut
national pour la redynamisati      IDA / 70200                                A posteriori   ultants par entent   Direct - National       80,000.00   0.00                       2023-09-20   2023-12-27     2023-09-30                                          2023-12-04   2024-06-01
                                                 ment at Central Governmen                                                                                   ion
on du site web de la Cour de                                                                 e directe
                                                 t Level
s comptes (Hervé MUNTENG
A)

 ZR-COREF-344504-CS-INDV
/ Recrutement d'un consulta
nt pour la production du proj
                                                 Component 1. Strengthenin
et de guide pour l'examen d
                                                 g Public Resources Manage
u rapport consolidé de la situ     IDA / 70200                                A posteriori   Individuel           Open - National         50,000.00   0.00   Annulé              2023-04-05   2023-05-20     2023-05-15                2023-06-05                2023-07-10   2023-09-08
                                                 ment at Central Governmen
ation financière des entrepris
                                                 t Level
es publiques à l'usage des m
embres des services techniq
ues des commission ECOFIN
de l'Assemblée National et d
u Sén
 ZR-COREF-360909-CS-CDS /
                                                 Component 3. Project and C                  Sélection de cons
Recrutement d'un consultant                                                                                       Direct - Internation
                                   IDA / 70200   hange Management, and E      A posteriori   ultants par entent                          350,000.00   0.00   Annulé              2023-05-11   2023-05-12     2023-05-21                                          2023-07-25   2024-01-21
firme chargé de l'audit des d                                                                                     al
                                                 mergency Response                           e directe
épenses éligibles au progra
mme (PDE)

 ZR-COREF-344206-CS-INDV
/ Recrutement d'un Consulta                      Component 1. Strengthenin
nt National pour évaluer le ni                   g Public Resources Manage
                                   IDA / 70200                                A posteriori   Individuel           Open - National         40,000.00   0.00   Annulé              2023-02-25   2023-04-10     2023-03-18                2023-04-08                2023-05-13   2023-11-09
veau d'exécution des réform                      ment at Central Governmen
es engagées par les entrepri                     t Level
ses Publiques du secteur ext
ractif.

 ZR-COREF-305487-CS-INDV                         Component 3. Project and C
/ Recrutement d'un Deuxièm         IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited                 30,000.00   0.00   Annulé              2022-08-15   2022-08-19     2022-08-20   2022-11-03   2022-09-10   2022-11-18   2022-10-15   2023-10-15
e Comptable du Projet ENCO                       mergency Response
RE

 ZR-COREF-344327-CS-INDV
/ Recrutement d'un consulta
                                                 Component 1. Strengthenin
nt international et d'un cons
                                                 g Public Resources Manage
ultant national pour mener u       IDA / 70200                                A posteriori   Individuel           Limited                100,000.00   0.00   Annulé              2023-03-27                  2023-04-01                2023-04-22                2023-05-27   2023-11-23
                                                 ment at Central Governmen
ne étude relative à la mise e
                                                 t Level
n place d'une solution inform
atique nécessaire au fonctio
nnement du CUT

 ZR-COREF-387129-CS-CDS /                        Component 3. Project and C                  Sélection de cons
                                                                                                                                                             En cours d'exécut
Recrutement d'un (e) Assista       IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National       33,600.00   0.00                       2023-10-12   2023-10-18     2023-10-22                                          2023-11-12   2024-11-11
                                                                                                                                                             ion
nt (e) du Coordonnateur Nati                     mergency Response                           e directe
onal

 ZR-COREF-387146-CS-CDS /
Recrutement d'un Spécialiste                     Component 3. Project and C                  Sélection de cons
                                                                                                                                                             En cours d'exécut
en Charge de la reforme de l'      IDA / 70200   hange Management, and E      A posteriori   ultants par entent   Direct - National       67,200.00   0.00                       2023-10-12   2023-10-18     2023-10-22                                          2023-11-12   2024-05-10
                                                                                                                                                             ion
Administration fiscale et gest                   mergency Response                           e directe
ion des revenus miniers, TSH
IKUB Judel

 ZR-COREF-387127-CS-CDS /                        Component 3. Project and C
                                                                                                                                                             En cours d'exécut
Recrutement d'un (e) chargé        IDA / 70200   hange Management, and E      A posteriori   Individuel           Open - National         54,000.00   0.00                       2023-10-24   2023-10-24     2023-11-26                2023-12-17                2024-01-21   2024-07-19
                                                                                                                                                             ion
(e) des opérations du Projet                     mergency Response
ENCORE

 ZR-COREF-390499-CS-INDV
                                                 Component 1. Strengthenin
/ Recrutement des trois (03)
                                                 g Public Resources Manage                                                                                   En cours d'exécut
consultants individuels pour l     IDA / 70200                                A posteriori   Individuel           Open - National        100,000.00   0.00                       2023-10-30   2023-11-15     2023-11-20                2023-12-04                2024-01-08   2024-07-06
                                                 ment at Central Governmen                                                                                   ion
a mise à jour des guides d’él
                                                 t Level
aboration du PEB et du PTR e
n lien avec le PPM

 ZR-COREF-390502-CS-INDV
                                                 Component 3. Project and C
/ Recrutement d'un (e) Assist                                                                                                                                En cours d'exécut
                                   IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited                 33,600.00   0.00                       2023-10-30   2023-11-30     2023-11-04                2023-11-25                2023-12-30   2024-06-27
ant (e) en Passation des Mar                                                                                                                                 ion
                                                 mergency Response
chés du Projet ENCORE


 ZR-COREF-390507-CS-INDV
                                                 Component 3. Project and C
/ Recrutement d’un (e) Spéci                                                                                                                                 En cours d'exécut
                                   IDA / 70200   hange Management, and E      A posteriori   Individuel           Open - National         67,200.00   0.00                       2023-11-15   2023-12-04     2024-01-03                2024-01-24                2024-02-28   2024-08-26
aliste chargé des systèmes d                                                                                                                                 ion
                                                 mergency Response
’information du projet ENCO
RE

 ZR-COREF-390500-CS-INDV
                                                 Component 3. Project and C
/ Recrutement d'un (e) charg                                                                                                                                 En cours d'exécut
                                   IDA / 70200   hange Management, and E      A posteriori   Individuel           Open - National         39,600.00   0.00                       2023-11-30   2024-01-24     2024-01-18                2024-02-08                2024-03-14   2024-09-10
é (e) de Passation des March                                                                                                                                 ion
                                                 mergency Response
és du Projet ENCORE


 ZR-COREF-390510-CS-CQS /                        Component 1. Strengthenin
                                                                                             Sélection de cons
Recrutement d’un Cabinet In                      g Public Resources Manage                                        Direct - Internation                       En cours d'exécut
                                   IDA / 70200                                A posteriori   ultants par entent                          100,000.00   0.00                       2023-12-04   2023-12-04     2023-12-14                                          2024-02-17   2024-08-15
dépendant pour élaborer le r                     ment at Central Governmen                                        al                                         ion
                                                                                             e directe
apport ITIE-RDC 2022                             t Level


 ZR-COREF-409858-CS-INDV                         Component 1. Strengthenin
/ Recrutement d'un consulta                      g Public Resources Manage                                        Open - Internationa                        En cours d'exécut
                                   IDA / 70200                                A posteriori   Individuel                                  100,000.00   0.00                       2024-04-04   2024-03-04     2024-05-23                2024-06-13                2024-07-18   2025-01-14
nt international pour la prod                    ment at Central Governmen                                        l                                          ion
uction de la stratégie sectori                   t Level
elle du Portefeuille

 ZR-COREF-409942-CS-INDV
                                                 Component 1. Strengthenin
/ Recrutement d’un consulta
                                                 g Public Resources Manage                                                                                   En cours d'exécut
nt national pour élaborer le       IDA / 70200                                A posteriori   Individuel           Open - National        100,000.00   0.00                       2024-04-04   2024-03-11     2024-05-23                2024-06-13                2024-07-18   2025-01-14
                                                 ment at Central Governmen                                                                                   ion
manuel des procédures de c
                                                 t Level
ollecte de la redevance mini
ère pour la DGRAD

 ZR-COREF-409944-CS-INDV
/ Recrutement d'un consulta                      Component 3. Project and C
                                                                                                                  Open - Internationa                        En attente d'exéc
nt International chargé d'opti     IDA / 70200   hange Management, and E      A posteriori   Individuel                                  100,000.00   0.00                       2024-04-04                  2024-05-23                2024-06-13                2024-07-18   2025-01-14
                                                                                                                  l                                          ution
miser les macro-processus d                      mergency Response
e gestion des ressources hu
maines et de la paie

 ZR-COREF-410254-CS-CDS /
Recrutement d’un consultant
                                                 Component 1. Strengthenin
individuel international senio                                                               Sélection de cons
                                                 g Public Resources Manage                                        Direct - Internation                       En cours d'exécut
r charge d’accompagner l’AR        IDA / 70200                                A posteriori   ultants par entent                          100,000.00   0.00                       2024-02-19   2024-02-28     2024-02-29   2024-04-10                             2024-05-04   2024-10-31
                                                 ment at Central Governmen                                        al                                         ion
MP dans la mise en œuvre d                                                                   e directe
                                                 t Level
u plan stratégique de la réfor
me du système des marches
publics de la RDC

 ZR-COREF-378877-CS-INDV
/ Recrutement d'un consulta
nt individuel pour effectuer l                   Component 3. Project and C
es études (cahier des charge       IDA / 70200   hange Management, and E      A posteriori   Individuel           Limited                  5,000.00   0.00   Annulé              2023-09-25   2023-12-07     2023-09-30                2023-10-21                2023-11-25   2024-05-23
s) relatives à la réhabilitation                 mergency Response
du bâtiment mis à dispositio
n pour la coordination provin
ciale du Kasaï

 ZR-COREF-344723-CS-INDV                         Component 1. Strengthenin
/ Recrutement d'un consulta                      g Public Resources Manage
                                   IDA / 70200                                A posteriori   Individuel           Open - National         50,000.00   0.00   Annulé              2023-07-03   2023-12-07     2023-08-21                2023-09-11                2023-10-16   2023-12-15
nt pour la production des con                    ment at Central Governmen
trats de performance type pa                     t Level
r secteur d'activités

 ZR-COREF-410595-CS-INDV
/ Recrutement d'un consulta
                                                 Component 1. Strengthenin
nt individuel pour l'élaboratio
                                                 g Public Resources Manage                                                                                   En attente d'exéc
n des contrats de performan        IDA / 70200                                A posteriori   Individuel           Open - National         50,000.00   0.00                       2024-04-08                  2024-05-27                2024-06-17                2024-07-22   2025-01-18
                                                 ment at Central Governmen                                                                                   ution
ce pour chacune des entrepri
                                                 t Level
ses publiques structurantes,
assis sur leurs plans stratégi
ques de développement

 ZR-COREF-410741-CS-CDS /
Recrutement d'un consultant
                                                 Component 3. Project and C                  Sélection de cons
individuel international en v                                                                                     Direct - Internation                       En cours d'exécut
                                   IDA / 70200   hange Management, and E      A posteriori   ultants par entent                          100,000.00   0.00                       2024-03-01   2024-03-07     2024-03-11                                          2024-05-15   2025-05-15
ue de l'accompagnement po                                                                                         al                                         ion
                                                 mergency Response                           e directe
ur la sélection de l'assistance
en maitrise d'ouvrage du SIG
eFIP_ MAX RESANDRASOA

 ZR-COREF-410746-CS-INDV
                                                 Component 3. Project and C
/ Recrutement d'un consulta                                                                                       Open - Internationa                        En attente d'exéc
                                   IDA / 70200   hange Management, and E      A posteriori   Individuel                                  100,000.00   0.00                       2024-03-24                  2024-05-12                2024-06-02                2024-07-07   2025-01-03
nt individuel pour la producti                                                                                    l                                          ution
                                                 mergency Response
on du guide de contrôle bud
gétaire




                                                                                                                                                                                                   Page 13
 ZR-COREF-410753-CS-INDV
/ Recrutement d'une équipe
                                                Component 1. Strengthenin
de deux consultants nationa
                                                g Public Resources Manage                                                                                      En attente d'exéc
ux pour l'analyse des rapport     IDA / 70200                                 A posteriori   Individuel           Open - National         100,000.00    0.00                       2024-03-24                  2024-05-12                2024-06-02   2024-07-07   2025-01-03
                                                ment at Central Governmen                                                                                      ution
s d'exécution des lois de fin
                                                t Level
ances de 2021 à 2023 (reddi
tion des comptes) par la Soci
été Civile

 ZR-COREF-410755-CS-INDV                        Component 1. Strengthenin
/ Recrutement d'un consulta                     g Public Resources Manage                                         Open - Internationa                          En attente d'exéc
                                  IDA / 70200                                 A posteriori   Individuel                                   100,000.00    0.00                       2024-02-29                  2024-04-18                2024-05-09   2024-06-13   2024-12-10
nt individuel pour la producti                  ment at Central Governmen                                         l                                            ution
on de la stratégie de l'Etat ac                 t Level
tionnaire

 ZR-COREF-414217-CS-INDV
/ Recrutement d'un consulta
nt individuel chargé de dével                   Component 2. Supporting
opper une application inform                    Resource Management at th                                                                                      En attente d'exéc
                                  IDA / 70200                                 A posteriori   Individuel           Open - National         100,000.00    0.00                       2024-04-07                  2024-05-26                2024-06-16   2024-07-21   2025-01-17
atique destinée à l'enregistre                  e Provincial Government Lev                                                                                    ution
ment des contribuables (ass                     el
ujettis) de quatre provinces
de la RDC (Kasaï, Kasaï Centr
al, Kasaï Oriental et Lomami)
.
 ZR-COREF-414224-CS-INDV
/ Recrutement d'un consulta                     Component 2. Supporting
nt individuel pour mener les                    Resource Management at th                                                                                      En attente d'exéc
                                  IDA / 70200                                 A posteriori   Individuel           Limited - National       50,000.00    0.00                       2024-04-21                  2024-04-26                2024-05-17   2024-06-21   2024-12-18
études de faisabilité et d'inst                 e Provincial Government Lev                                                                                    ution
allation des panneaux solaire                   el
s dans les quatre régies fina
ncières provinciales

 ZR-COREF-417533-CS-INDV
/ Recrutement d’un consulta
                                                Component 1. Strengthenin
nt international en vue du dé
                                                g Public Resources Manage                                         Open - Internationa                          En cours d'exécut
veloppement de la stratégie       IDA / 70200                                 A posteriori   Individuel                                   100,000.00    0.00                       2024-05-19   2024-03-27     2024-07-07                2024-07-28   2024-09-01   2025-02-28
                                                ment at Central Governmen                                         l                                            ion
de mise en œuvre d'une solu
                                                t Level
tion d'archivage électronique
des dossiers des marchés pu
blics

 ZR-COREF-419332-CS-INDV
/ Recrutement d'un Consulta
nt Individuel pour mener l'ét
                                                Component 2. Supporting
ude de faisabilité, dimension
                                                Resource Management at th                                                                                      En cours d'exécut
nement et contrôle des trava      IDA / 70200                                 A posteriori   Individuel           Open - National          50,000.00    0.00                       2024-05-05   2024-04-03     2024-06-23                2024-07-14   2024-08-18   2025-02-14
                                                e Provincial Government Lev                                                                                    ion
ux d'installation du système
                                                el
solaire des bâtiments des ad
ministrations financières pro
vinciales du Kasai, du Kasai
Cent, du Kasai Or et Lomami

 ZR-COREF-419459-CS-CDS /
Recrutement d'un Cabinet in                     Component 1. Strengthenin
                                                                                             Sélection de cons
ternational Expertise France,                   g Public Resources Manage                                         Direct - Internation                         En cours d'exame
                                  IDA / 70200                                 A priori       ultants par entent                          2,035,184.00   0.00                       2024-03-30                  2024-04-09                             2024-06-13   2024-12-10
chargé d’appuyer la Cour de                     ment at Central Governmen                                         al                                           n
                                                                                             e directe
s comptes dans la mise en œ                     t Level
uvre de son plan stratégique


 ZR-COREF-344818-CS-CDS /
Recrutement d'un Cabinet in                     Component 1. Strengthenin
                                                                                             Sélection de cons
ternational Expertise France,                   g Public Resources Manage                                         Direct - Internation
                                  IDA / 70200                                 A posteriori   ultants par entent                           400,000.00    0.00   Annulé              2023-03-24   2023-04-10     2023-04-03                             2023-06-07   2023-12-04
chargé d’appuyer la Cour de                     ment at Central Governmen                                         al
                                                                                             e directe
s comptes dans la mise en œ                     t Level
uvre de son plan stratégique


 ZR-COREF-420799-CS-CDS /
recrutement d’un consultant
                                                Component 3. Project and C                   Sélection de cons
(Firme) chargé de la vérificat                                                                                                                                 En cours d'exécut
                                  IDA / 70200   hange Management, and E       A posteriori   ultants par entent   Direct - National       350,000.00    0.00                       2024-04-05   2024-04-05     2024-04-15   2024-04-10                2024-06-19   2024-12-16
ion de l’atteinte de CBP 4.2 e                                                                                                                                 ion
                                                mergency Response                            e directe
t de l’audit des Dépenses Eli
gibles au Programme (DEP).


 ZR-COREF-423725-CS-INDV
                                                Component 1. Strengthenin
/ Recrutement d'un consulta
                                                g Public Resources Manage                                                                                      En attente d'exéc
nt individuel pour la producti    IDA / 70200                                 A posteriori   Individuel           Open - National          30,000.00    0.00                       2024-04-29                  2024-06-17                2024-07-08   2024-08-12   2025-02-08
                                                ment at Central Governmen                                                                                      ution
on du projet de plan de renfo
                                                t Level
rcement des capacités des c
ontrôleurs budgétaires




                                                                                                                                                                                                     Page 14