PROCUREMENT PLAN (Textual Part) Project information: Country: Democratic Republic of Congo; Project name: DRC Enhancing Collection of Revenue and Expenditure Management Project (ENCORE), Project number: P171762 Project Implementation agency: Comité d’Orientation de la Réforme des Finances Publiques (COREF) Date of the Procurement Plan: 02/12/2021 Period covered by this Procurement Plan: from 12/02/2021 to 05/01/2021 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation: “Not applicable”], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. “Not Applicable” Procurement of Secondhand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables. Works: is not applicable for those contracts identified in the Procurement Plan tables Revue Date prévue Méthode par la pour Réf. Prévu/Ré Commentai Description* Coût en $US de Banque l'ouverture No al. res sélection (priori/po de l'offre st) technique Sélection des consultants Recrutement du personnel clé et du 248 Prévu CI Post NA 1 personnel d’appoint de l’Equipe du Projet 600,00 (Période PPA) Réalisé Sélection d'un consultant cabinet Prévu 150 QC Post NA international en vue de mener les études de 000,00 2 faisabilité pour la mise en œuvre de E- Réalisé Procurement en RDC Recrutement d'un Consultant international 90 Prévu CI Post 25-3-2022 3 chargé de l’appui à la mise en œuvre du 000,00 SIGRH-Paie Réalisé Sélection d'un consultant individuel chargé Prévu 70 CI Post NA d'appuyer l'élaboration des textes fixant les 000,00 4 modalités de répartition des recettes à Réalisé caractère national Sélection d'un consultant individuel pour Prévu 50 CI Post NA réaliser une étude de faisabilité pour la mise 000,00 5 en place des administrations provinciales du trésor, de la comptabilité et du budget dans Réalisé 3 provinces identifiées Sélection d'un consultant individuel pour 50 élaborer un cahier de charges de mise en Prévu CI Post NA 000,00 6 place d'un système intégré des recettes et des dépenses en Provinces Réalisé Revue Date prévue Méthode par la pour Réf. Prévu/Ré Commentai Description* Coût en $US de Banque l'ouverture No al. res sélection (priori/po de l'offre st) technique Sélection d'un Consultant individuel pour la Prévu 50 CI Post NA rédaction du manuel des procédures de 000,00 7 gestion financière et de la passation des Réalisé marchés du Projet ENCORE Sélection d'un Cabinet pour l'acquisition et le 50 Prévu QC Post NA 8 paramétrage du logiciel de stockage et 000,00 analyse des données du Suivi-Evaluation Réalisé Sélection d'un Consultant cabinet pour Prévu 50 QC Post NA l'acquisition et le paramétrage du logiciel de 000,00 9 gestion de projet (technique et mise en Réalisé œuvre des activités) Recrutement d'un Consultant individuel Prévu 45 CI Post NA chargé de la conception et la mise en œuvre 000,00 10 d’une plateforme web pour la mise à jour du fichier de référence des agents de Réalisé l’Administration publique (FRAP 2) Sélection d'un Cabinet Webmaster pour la 45 Prévu QC Post NA 11 mise en place du Site WEB de 3 provinces 000,00 sélectionnées Réalisé Sélection d'un consultant international expert 40 Prévu CI Post en sondage pour 4 mois chargé 000,00 12 d’accompagner l’équipe technique nationale dans l'organisation de l'enquête et Réalisé l'actualisation de la base d'échantillonnage Revue Date prévue Méthode par la pour Réf. Prévu/Ré Commentai Description* Coût en $US de Banque l'ouverture No al. res sélection (priori/po de l'offre st) technique Sélection d'un consultant pour l'évaluation de 30 Prévu CI Post NA la répartition effective (etude Benefit Sharing 000,00 13 Assessment ou BSA) des recettes minières Réalisé au niveau local (0.3% aux ETDs) Sélection d'un Consultant individuel pour la Prévu 30 CI Post 18-3-2022 14 rédaction du manuel de vérification des PBCs 000,00 et PBPs du Projet ENCORE Réalisé Sélection d'un consultant cabinet chargé de 25 Prévu SMC Post NA 15 l'Audit financier externe du PPA clos au 000,00 30/04/2022 Réalisé Sélection d'un Consultant Individuel chargé 25 Prévu CI Post NA 16 d'élaborer le plan d'engagement 000,00 environnemental et social Réalisé Sélection d'un Consultant Individuel chargé 25 Prévu CI Post 5-3-2022 17 d'élaborer le plan de mobilisation des parties 000,00 prenantes Réalisé 24 Sélection d'un Consultant Individuel Prévu CI Post 5-3-2022 18 000,00 Ingénieur Génie Civil Réalisé Sélection d'un consultant international expert Prévu 20 CI Post 5-3-2022 en CAPI pour 2 mois qui seront chargés 000,00 19 d’accompagner l’équipe technique nationale Réalisé dans l'organisation de l'enquête et Revue Date prévue Méthode par la pour Réf. Prévu/Ré Commentai Description* Coût en $US de Banque l'ouverture No al. res sélection (priori/po de l'offre st) technique l'actualisation de la base d'échantillonnage Sélection d'un Consultant pour appuyer la Prévu 16 ED Post NA 20 2ème phase de la mise en place de SIGMAP 000,00 (20 nouvelles cellules) (Pierre Tshiyombo) Réalisé 15 Sélection d'un Cabinet Webmaster pour la Prévu QC Post NA 21 000,00 mise en place du Site WEB du Projet ENCORE Réalisé Recrutement d'un Consultant Expert en 14 Prévu CI Post NA informatique et systèmes d’information 000,00 22 chargé d’appuyer la mise en œuvre du Système Intégré de Gestion des Ressources Réalisé Humaines et de la Paie (SIGRH-Paie) Recrutement d'un Consultant National 14 Prévu CI Post NA individuel en Administration Publique chargé 000,00 23 d’appuyer la mise en œuvre du Système Intégré de Gestion des Ressources Humaines Réalisé et de la Paie (SIGRH-Paie) 1 175 600,00 SFQC : sélection fondée sur la qualité et le coût QC : sélection fondée sur les qualifications des consultants SMC : sélection au moindre coût CI : sélection de Consultant individuel ED: sélection par entente directe PROCUREMENT Congo, Democratic Republic of : Enhancing Collection of Revenue and Expenditure Management Project PLAN General Information Country: Congo, Democratic Republic of 2021-12-02 Bank’s Approval Date of the Original Procurement Plan: Revised Plan Date(s): (comma delineated, leave blank 2024-04-23 if none) Project ID: P171762 GPN Date: 2022-06-14 Project Name: Enhancing Collection of Revenue and Expenditure Management Project Loan / Credit No: IDA / 70200, / , IDA / V4000 Comité d'Orientation de la Reforme des Finances Publiques Executing Agency(ies): WORKS Activity Reference No. / Procurement Estimated Actual A Bid Evaluation Report Loan / Credit N Market Approac Procurement Pr Prequalification High SEA/SH Process S Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Contract Comple Description Component Review Type Method Document Typ Amount (U mount (U and Recommendatio Signed Contract o. h ocess (Y/N) Risk tatus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes tion e S$) S$) n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Demande de cota ZR-COREF-345140-CW-RFQ / Component 1. Strengthenin tions - DTPM Petit Travaux de réhabilitation du g Public Resources Manage Single Stage - One En attente 2024-02-1 IDA / 70200 A posteriori Demande de prix Open - National s travaux (urgenc 200,000.00 0.00 2023-06-20 2023-08-15 bâtiment devant abriter la ch ment at Central Governmen Envelope d'exécution 1 e) - Avec compéti ambre des comptes déconce t Level tion ntrées de Kananga Demande de cota ZR-COREF-345177-CW-RFQ / Component 3. Project and C tions - DTPM Petit Réhabilitation du bâtiment m Single Stage - One En attente 2023-12-1 IDA / 70200 hange Management, and E A posteriori Demande de prix Open - National s travaux (urgenc 100,000.00 0.00 2023-04-27 2023-06-22 is à disposition pour la coordi Envelope d'exécution 9 mergency Response e) - Avec compéti nation provinciale du Kasaï tion Demande de cota ZR-COREF-345180-CW-RFQ / Component 3. Project and C tions - DTPM Petit Single Stage - One En attente 2023-12-2 Réhabilitation des bâtiments IDA / 70200 hange Management, and E A posteriori Demande de prix Open - National s travaux (urgenc 145,000.00 0.00 2023-05-03 2023-06-28 Envelope d'exécution 5 de la coordination nationale mergency Response e) - Avec compéti tion ZR-COREF-345109-CW-RFQ / Appui à l'aménagement des l Component 1. Strengthenin Demande de cota ocaux devant abriter les post g Public Resources Manage Single Stage - One tions (DTPM ne pr En attente 2023-12-2 es du réseau comptable à Ki IDA / 70200 A posteriori Demande de prix Limited 150,000.00 0.00 2023-04-30 2023-06-25 ment at Central Governmen Envelope ovenant pas de la d'exécution 2 nshasa pour les postes comp t Level Banque) tables des 4 ministères déco ncentrés (EPST, Santé, ITPR et Développement Rural) + l' ACCT Demande de cota ZR-COREF-356044-CW-RFQ / Component 1. Strengthenin tions - DTPM Petit Travaux d’aménagement du g Public Resources Manage Single Stage - One En attente 2024-01-2 IDA / 70200 A posteriori Demande de prix Limited s travaux (urgenc 50,000.00 0.00 2023-05-30 2023-07-25 local technique du datacente ment at Central Governmen Envelope d'exécution 1 e) - Avec compéti r de l'Hôtel du Gouvernemen t Level tion t Demande de cota ZR-COREF-378941-CW-RFQ / Component 3. Project and C tions - DTPM Petit Petits travaux de rafraîchisse Single Stage - One En attente 2024-05-1 IDA / 70200 hange Management, and E A posteriori Demande de prix Limited s travaux (urgenc 125,000.00 0.00 2023-09-25 2023-11-20 ment des murs (peinture, éta Envelope d'exécution 8 mergency Response e) - Avec compéti nchéité) des bureaux de la C tion SPP GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pr Prequalification Estimated Am Actual Amount Process St Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Description Component Review Type Method and Recommendatio Signed Contract Contract Completion o. h ocess (Y/N) ount (US$) (US$) atus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-COREF-265014-GO-DIR / Component 3. Project and C Acquisition d'un logiciel de g Passation de mar IDA / 70200 hange Management, and E A posteriori Direct 50,000.00 46,473.00 Signé 2021-12-20 2021-12-20 2021-12-25 2021-12-20 2022-01-27 2022-02-16 2022-03-28 2022-12-12 estion financière du projet E ché de gré à gré mergency Response NCORE (auprès de TOMATE) ZR-COREF-265086-GO-DIR / Marché de fourniture de Rec Component 1. Strengthenin harge des Clés APN pour la r g Public Resources Manage Passation de mar IDA / 70200 A posteriori Direct 20,000.00 20,000.00 Achevé 2021-12-24 2022-01-25 2021-12-29 2022-01-21 2022-01-14 2022-01-30 2022-04-30 2022-05-07 emontée des informations de ment at Central Governmen ché de gré à gré s 75 Administrations + l’équi t Level pe technique de la FP (25)/ S OCIETE RAAH SARL ZR-COREF-296509-GO-DIR / Reconduction du contrat des fournitures de recharge des Component 1. Strengthenin clés APN pour la remontée d g Public Resources Manage Passation de mar IDA / 70200 A posteriori Direct 15,000.00 15,000.00 Achevé 2022-05-23 2022-05-23 2022-05-25 2022-05-23 2022-05-29 2022-06-03 2022-07-31 2022-07-10 es informations de 75 admini ment at Central Governmen ché de gré à gré strations + l'équipe techniqu t Level e de la FP (25) pour la périod e de Mai à Juillet 2022 - Soci été RAAH SARL ZR-COREF-296039-GO-RFQ / Component 3. Project and C Acquisition des laptops et ac Single Stage - One IDA / V4000 hange Management, and E A posteriori Demande de prix Limited 49,000.00 46,270.00 Signé 2022-06-09 2022-06-06 2022-07-05 2022-07-27 2022-08-05 2022-12-19 cessoires pour le personnel d Envelope mergency Response u PPA du Projet ENCORE ZR-COREF-345208-GO-RFB / Acquisition des équipements Component 1. Strengthenin informatiques pour les 4 cent g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 600,000.00 0.00 2023-05-15 2023-05-20 2023-07-01 2023-07-31 2023-09-04 2024-03-02 res d'ordonnancement et po ment at Central Governmen Envelope exécution ur le renforcement du systè t Level me d'information de la chaîn e de la dépense ZR-COREF-345267-GO-RFQ / Impression du manuel des pr Component 1. Strengthenin océdures administratives et f g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 100,000.00 0.00 2023-04-25 2023-06-20 2023-12-17 inancières des DAF (2000 ex ment at Central Governmen Envelope exécution emplaires de 220 pages dont t Level certaines pages en couleur) ZR-COREF-345306-GO-RFQ / Component 1. Strengthenin Appui à la reproduction des g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 100,000.00 0.00 2023-04-15 2023-06-10 2023-12-07 manuels et textes règlement ment at Central Governmen Envelope exécution aires élaborés et validés t Level ZR-COREF-345326-GO-RFQ / Component 1. Strengthenin Single Stage - One En attente d' Acquisition des équipements IDA / 70200 g Public Resources Manage A posteriori Demande de prix Limited 100,000.00 0.00 2023-07-06 2023-08-31 2024-02-27 Envelope exécution informatiques des postes clé ment at Central Governmen s de la DGTCP t Level ZR-COREF-345327-GO-RFQ / Component 1. Strengthenin Single Stage - One En attente d' Acquisition des mobiliers de IDA / 70200 g Public Resources Manage A posteriori Demande de prix Limited 90,000.00 0.00 2023-07-27 2023-09-21 2024-03-19 Envelope exécution bureau des postes clés de la ment at Central Governmen DGTCP t Level ZR-COREF-345456-GO-RFQ / Component 1. Strengthenin Acquisition des petites fourni g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 50,000.00 0.00 2023-08-12 2023-10-07 2024-04-04 tures de bureaux et consom ment at Central Governmen Envelope exécution mables en faveur des postes t Level clés de la DGTCP ZR-COREF-345460-GO-RFB / Component 1. Strengthenin Single Stage - One En attente d' Acquisition d'une solution inf IDA / 70200 g Public Resources Manage A posteriori Appel d'offres Open - National 1,200,000.00 0.00 2023-07-15 2023-07-20 2023-08-31 2023-09-30 2023-11-04 2024-05-02 Envelope exécution ormatique du CUT ment at Central Governmen t Level ZR-COREF-345512-GO-RFQ / Component 1. Strengthenin Acquisition de 100 machines g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 200,000.00 0.00 2023-05-04 2023-06-29 2023-12-26 d'impression des cartes des ment at Central Governmen Envelope exécution agents de carrières de servic t Level es publics de l'Etat ZR-COREF-345539-GO-RFQ / Acquisition des matériels inf Component 1. Strengthenin ormatiques pour le déploiem g Public Resources Manage Single Stage - One En attente d' ent du SIGMAP dans 20 CGP IDA / 70200 A posteriori Demande de prix Limited 150,000.00 0.00 2023-06-20 2023-08-15 2024-02-11 ment at Central Governmen Envelope exécution MPs additionnelles au niveau t Level central, la DGCMP ainsi que l a salle machine SIGMAP au M in du Budget. ZR-COREF-345540-GO-RFQ / Component 1. Strengthenin Acquisition des mobiliers de g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 30,000.00 0.00 2023-06-25 2023-08-20 2024-02-16 bureau pour la salle de mach ment at Central Governmen Envelope exécution ine SIGMAP au Budget. t Level ZR-COREF-345544-GO-RFQ / Abonnement internet de la C Component 1. Strengthenin our des comptes pour la publ g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 35,000.00 0.00 2023-04-11 2023-06-06 2023-12-03 ication notamment des rapp ment at Central Governmen Envelope exécution orts de reddition des compte t Level s du pouvoir central et des p rovinces couvertes par le pro jet ZR-COREF-345548-GO-RFQ / Component 1. Strengthenin Appui à la reproduction des g Public Resources Manage Single Stage - One En attente d' textes fixant les modalités d IDA / 70200 A posteriori Demande de prix Limited 30,000.00 0.00 2023-05-11 2023-07-06 2024-01-02 ment at Central Governmen Envelope exécution e répartition des impôts et ta t Level xes d’intérêt commun Page 1 ZR-COREF-345582-GO-RFQ / Acquisition des desktops et a Component 3. Project and C Single Stage - One En attente d' ccessoires pour le personnel IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 60,000.00 0.00 2023-04-20 2023-06-15 2023-12-12 Envelope exécution du Projet ENCORE (Coordina mergency Response tion nationale et coordinatio ns provinciales) ZR-COREF-345591-GO-RFQ / Acquisition des imprimantes Component 3. Project and C Single Stage - One En attente d' et appareils de reprographie IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 60,000.00 0.00 2023-04-22 2023-06-17 2023-12-14 Envelope exécution pour le Projet ENCORE (Coor mergency Response dination nationale et coordin ations provinciales) ZR-COREF-345620-GO-RFQ / Component 3. Project and C Single Stage - One En attente d' Production d'un nouveau pa IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 2,000.00 0.00 2023-04-04 2023-05-30 2023-11-26 Envelope exécution nneau ENCORE mergency Response ZR-COREF-345703-GO-DIR / Component 1. Strengthenin Passation de mar En attente d' Rechargement des Clés APN IDA / 70200 g Public Resources Manage A posteriori Direct - National 60,000.00 0.00 2023-03-20 2023-03-25 2023-04-29 2024-04-28 ché de gré à gré exécution pour 75 postes ment at Central Governmen t Level ZR-COREF-345707-GO-RFQ / Component 3. Project and C Reproduction des documents Single Stage - One En attente d' IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 50,000.00 0.00 2023-05-18 2023-07-13 2024-01-09 stratégiques sur les réformes Envelope exécution mergency Response des finances publiques ZR-COREF-345708-GO-RFQ / Component 3. Project and C Reproduction de la revue tri Single Stage - One En attente d' IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 40,000.00 0.00 2023-04-20 2023-06-15 2023-12-12 mestrielle sur la réforme des Envelope exécution mergency Response finances publiques ZR-COREF-345711-GO-RFQ / Component 3. Project and C Single Stage - One En attente d' Reproduction des agendas 2 IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 40,000.00 0.00 2023-04-01 2023-05-27 2023-11-23 Envelope exécution 023 pour le Projet ENCORE mergency Response ZR-COREF-345478-GO-RFQ / Component 1. Strengthenin Single Stage - One En attente d' Mise aux normes de sécurisa IDA / 70200 g Public Resources Manage A posteriori Demande de prix Limited 60,000.00 0.00 2023-08-12 2023-10-07 2024-04-04 Envelope exécution tion du Data Center de secou ment at Central Governmen rs t Level ZR-COREF-345288-GO-RFB / Component 1. Strengthenin Acquisition des fournitures d g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 600,000.00 0.00 2023-08-07 2023-08-12 2023-09-23 2023-10-23 2023-11-27 2024-05-25 e bureau et consommables p ment at Central Governmen Envelope exécution our les 12 nouvelles DAF à in t Level staller ZR-COREF-345249-GO-RFQ / Component 1. Strengthenin Achat des mobiliers de burea g Public Resources Manage Single Stage - One En attente d' u pour les 4 centres d'ordonn IDA / 70200 A posteriori Demande de prix Limited 320,000.00 0.00 2023-04-19 2023-06-14 2023-12-11 ment at Central Governmen Envelope exécution ancement des ministères de t Level l’EPST, Santé, Développeme nt rural et des ITPR. ZR-COREF-345272-GO-RFB / Acquisition des matériels et mobiliers de bureau pour les Component 1. Strengthenin 12 nouvelles DAF (Affaires ét g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 1,000,000.00 0.00 2023-04-10 2023-04-15 2023-05-20 2023-06-10 2023-07-15 2024-01-11 rangères, Coopération intern ment at Central Governmen Envelope exécution ational, Coopération régional t Level e, Economie, Energie, Hydro carbures, Jeunesse, Mines, P ME et artisanat, PTNTIC, Spor ts et loisirs, Justice) ZR-COREF-345320-GO-RFQ / Acquisition des équipements Component 1. Strengthenin informatiques et petites four g Public Resources Manage Single Stage - One En attente d' nitures pour l'opérationnalisa IDA / 70200 A posteriori Demande de prix Limited 200,000.00 0.00 2023-07-20 2023-09-14 2024-03-12 ment at Central Governmen Envelope exécution tion de l'ACCT, de postes co t Level mptables des 4 ministères d éconcentrés (EPST, Santé, IT PR et Développement Rural) ZR-COREF-345705-GO-DIR / Appui à la migration du SIGM Component 1. Strengthenin AP vers un hébergeur sécuris g Public Resources Manage Passation de mar Direct - Internation IDA / 70200 A posteriori 15,000.00 0.00 Annulé 2023-07-25 2023-07-30 2023-09-03 2024-03-01 é, (frais d'hébergement) et ment at Central Governmen ché de gré à gré al Abonnement annuel de l'héb t Level ergement du SIGMAP avec l' entreprise GODADDY ZR-COREF-363973-GO-DIR / Appui à la migration du SIGM Component 1. Strengthenin AP vers un hébergeur sécuris g Public Resources Manage Passation de mar En cours d'e IDA / 70200 A posteriori Direct - National 15,000.00 0.00 2023-05-30 2023-05-31 2023-06-04 2023-06-01 2023-07-09 2024-01-05 é (frais d'hebergement) et a ment at Central Governmen ché de gré à gré xécution bonnement annuel de l'hebe t Level rgement du SIGMAP avec l'e ntreprise ITIK ZR-COREF-362725-GO-RFQ / Acquisition de 2 véhicules 4X Component 2. Supporting 4 pour faciliter le déploiemen Resource Management at th Single Stage - One En attente d' t des équipes de recenseme IDA / 70200 A posteriori Demande de prix Limited 160,000.00 0.00 2023-07-06 2023-08-31 2024-02-27 e Provincial Government Lev Envelope exécution nt et de collecte des donnée el s à Kinshasa et dans les 4 pr ovinces du Kasaï, Kasaï Centr al, Kasaï Oriental et Lomami ZR-COREF-345281-GO-RFB / Acquisition des matériels inf ormatiques pour les 12 nouv Component 1. Strengthenin elles DAF, (Affaires étrangère g Public Resources Manage Open - Internationa Single Stage - One En cours d'e IDA / 70200 A priori Appel d'offres 2,200,000.00 0.00 2023-04-10 2023-07-19 2023-04-15 2023-08-07 2023-05-27 2023-09-20 2023-06-26 2023-11-13 2023-07-31 2024-01-27 s, Coopération international, ment at Central Governmen l Envelope xécution Coopération régionale, Econ t Level omie, Energie, Hydrocarbure s, Jeunesse, Mines, PME et ar tisanat, PTNTIC, Sports et loi sirs, Justice) ZR-COREF-362723-GO-RFQ / Component 3. Project and C Acquisition de 6 véhicules 4X Single Stage - One En attente d' IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 480,000.00 0.00 2023-07-06 2023-08-31 2024-02-27 4 dont 2 pour la coordination Envelope exécution mergency Response nationale et 4 pour les coordi nations provinciales ZR-COREF-371832-GO-RFQ / Component 1. Strengthenin Single Stage - One En attente d' Acquisition de 80 lecteurs d' IDA / 70200 g Public Resources Manage A posteriori Demande de prix Limited 100,000.00 0.00 2023-07-25 2023-09-19 2024-03-17 Envelope exécution empreintes pour identificatio ment at Central Governmen n biométrique t Level ZR-COREF-371834-GO-RFQ / Component 1. Strengthenin Acquisition des mobiliers de g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 350,000.00 0.00 2023-09-18 2023-09-23 2023-11-04 2023-12-04 2024-01-08 2024-07-06 bureau pour les 6 directions ment at Central Governmen Envelope exécution de la DGRH réhabilitées t Level ZR-COREF-371825-GO-RFQ / Component 1. Strengthenin Impression du Rapport ITIE-R g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 80,000.00 0.00 2023-09-18 2023-11-13 2024-05-11 DC, Exercices 2020 et 2021 ment at Central Governmen Envelope exécution pour la Dissémination t Level ZR-COREF-371830-GO-RFQ / Component 1. Strengthenin Acquisition de 40 machines s g Public Resources Manage Single Stage - One En attente d' canners pour la numérisation IDA / 70200 A posteriori Appel d'offres Open - National 250,000.00 0.00 2023-09-29 2023-10-04 2023-11-15 2023-12-15 2024-01-19 2024-07-17 ment at Central Governmen Envelope exécution des actes administratifs de f t Level onctionnaires en provinces e t au niveau central ZR-COREF-378587-GO-RFB / Component 1. Strengthenin Acquisition de 40 machines s g Public Resources Manage Single Stage - One En attente d' canners pour la numérisation IDA / 70200 A posteriori Appel d'offres Open - National 250,000.00 0.00 2023-09-08 2023-09-13 2023-10-25 2023-11-24 2023-12-29 2024-06-26 ment at Central Governmen Envelope exécution des actes administratifs de f t Level onctionnaires en provinces e t au niveau central ZR-COREF-378588-GO-DIR / Component 1. Strengthenin Renouvellement de l'abonne g Public Resources Manage Passation de mar Direct - Internation En cours d'e IDA / 70200 A posteriori 60,000.00 0.00 2023-08-30 2023-10-19 2023-09-04 2023-10-09 2024-04-06 ment des services du cloud p ment at Central Governmen ché de gré à gré al xécution our le FRAP avec la firme ora t Level cle ZR-COREF-378688-GO-RFQ / Component 3. Project and C Single Stage - One En attente d' Installation de la fibre optiqu IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 50,000.00 0.00 2023-09-20 2023-11-15 2024-05-13 Envelope exécution e pour la Connexion internet mergency Response ZR-COREF-378693-GO-RFQ / Component 3. Project and C Single Stage - One Acquisition d'un logiciel GED IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 50,000.00 0.00 Annulé 2023-10-07 2023-12-02 2024-05-30 Envelope pour le projet ENCORE mergency Response ZR-COREF-378703-GO-RFQ / Component 3. Project and C Acquisition de 2 véhicules po Single Stage - One En attente d' IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 160,000.00 0.00 2023-09-20 2023-11-15 2024-05-13 ur la coordonnatrice et les co Envelope exécution mergency Response urses de service de la CSPP ZR-COREF-378704-GO-RFQ / Component 3. Project and C Single Stage - One En attente d' Acquisition des mobiliers de IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 40,000.00 0.00 2023-10-14 2023-12-09 2024-06-06 Envelope exécution bureau de la CSSP mergency Response Page 2 ZR-COREF-378705-GO-RFQ / Component 3. Project and C Single Stage - One En attente d' Acquisition des matériels inf IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 70,000.00 0.00 2023-10-14 2023-12-09 2024-06-06 Envelope exécution ormatiques et de reprograph mergency Response ie de la CSPP ZR-COREF-378875-GO-RFQ / Component 1. Strengthenin Acquisition d'un scanner gro g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 6,000.00 0.00 2023-10-08 2023-12-03 2024-05-31 s format pour scanner les ra ment at Central Governmen Envelope exécution pports à publier en faveur de t Level la cour des comptes ZR-COREF-378943-GO-RFQ / Component 1. Strengthenin Single Stage - One En attente d' Acquisition de 4 véhicules 4x IDA / 70200 g Public Resources Manage A posteriori Demande de prix Limited 320,000.00 0.00 2023-10-07 2023-12-02 2024-05-30 Envelope exécution 4 pour les postes clés de la D ment at Central Governmen GTCP t Level ZR-COREF-378994-GO-RFQ / Component 1. Strengthenin Reproduction du rapport con g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 100,000.00 0.00 2023-10-23 2023-12-18 2024-06-15 solidé de la situation financiè ment at Central Governmen Envelope exécution re des entreprises publiques t Level ZR-COREF-379067-GO-RFB / Component 1. Strengthenin Acquisition des équipements g Public Resources Manage Single Stage - One En cours d'e IDA / 70200 A priori Appel d'offres Open - National 2,000,000.00 0.00 2023-09-25 2023-11-08 2023-09-30 2023-11-16 2023-11-11 2023-12-22 2023-12-11 2024-01-15 2024-07-13 informatiques complémentai ment at Central Governmen Envelope xamen res de la DGTCP t Level ZR-COREF-379069-GO-RFB / Component 1. Strengthenin Single Stage - One En cours d'e Acquisition des mobiliers de IDA / 70200 g Public Resources Manage A posteriori Appel d'offres Open - National 1,500,000.00 0.00 2023-09-26 2023-10-09 2023-10-01 2024-04-03 2023-11-12 2023-12-12 2024-01-16 2024-07-14 Envelope xécution bureau de la DGTCP ment at Central Governmen t Level ZR-COREF-379076-GO-RFB / Component 1. Strengthenin Acquisition des petites fourni g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 500,000.00 0.00 2023-10-30 2023-11-06 2023-12-18 2024-01-17 2024-02-21 2024-08-19 tures de bureaux et consom ment at Central Governmen Envelope exécution mables complémentaire en f t Level aveur de la DGTCP ZR-COREF-379121-GO-RFB / Acquisition des équipements Component 1. Strengthenin informatiques complémentai g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 600,000.00 0.00 2023-10-13 2023-10-18 2023-11-29 2023-12-29 2024-02-02 2024-07-31 res et consommables inform ment at Central Governmen Envelope exécution atiques pour les 20 CGPMPs t Level additionnelles au niveau cent ral, la DGCMP ZR-COREF-379122-GO-RFB / Acquisition des matériels et Component 2. Supporting consommables informatique Resource Management at th Single Stage - One En cours d'e IDA / 70200 A posteriori Appel d'offres Open - National 1,000,000.00 0.00 2023-10-13 2023-10-02 2023-10-18 2023-11-17 2023-11-29 2023-12-29 2024-02-02 2024-07-31 s en faveur des administratio e Provincial Government Lev Envelope xécution ns fiscales Provinciales du Ka el saï Oriental, du Kasaï, du Kas aï Central et de Lomami ZR-COREF-379123-GO-RFB / Acquisition des mobiliers de Component 2. Supporting bureaux en faveur des admin Resource Management at th Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 1,000,000.00 0.00 2023-10-05 2023-10-10 2023-11-21 2023-12-21 2024-01-25 2024-07-23 istrations fiscales Provinciale e Provincial Government Lev Envelope exécution s du Kasaï Oriental, du Kasaï, el du Kasaï Central et de Loma mi ZR-COREF-379124-GO-RFB / Component 2. Supporting Acquisition des fournitures d Resource Management at th Single Stage - One En cours d'e es bureaux pour les régies pr IDA / 70200 A posteriori Appel d'offres Open - National 800,000.00 0.00 2023-10-06 2024-03-11 2023-10-11 2024-03-26 2023-11-22 2023-12-22 2024-01-26 2024-07-24 e Provincial Government Lev Envelope xécution ovinciales du Kasaï Oriental, el du Kasaï, du Kasaï Central et de Lomami ZR-COREF-379125-GO-RFB / Acquisition des matériels et Component 2. Supporting consommables informatique Resource Management at th Single Stage - One En attente d' s en faveur des Services inte IDA / 70200 A posteriori Appel d'offres Open - National 500,000.00 0.00 2023-09-25 2023-09-30 2023-11-11 2023-12-11 2024-01-15 2024-07-13 e Provincial Government Lev Envelope exécution rvenant dans la chaîne de la el dépense du Kasaï Oriental, d u Kasaï, du Kasaï Central et d e Lomami ZR-COREF-379126-GO-RFB / Acquisition des mobiliers de Component 2. Supporting bureaux en faveur des Servic Resource Management at th Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 500,000.00 0.00 2023-09-26 2023-10-01 2023-11-12 2023-12-12 2024-01-16 2024-07-14 es intervenant dans la chaîn e Provincial Government Lev Envelope exécution e de la dépense du Kasaï Ori el ental, du Kasaï, du Kasaï Cen tral et de Lomami ZR-COREF-379127-GO-RFB / Acquisition des fournitures d Component 2. Supporting e bureaux en faveur des Ser Resource Management at th Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 300,000.00 0.00 2023-09-28 2023-10-03 2023-11-14 2023-12-14 2024-01-18 2024-07-16 vices intervenant dans la cha e Provincial Government Lev Envelope exécution îne de la dépense du Kasaï O el riental, du Kasaï, du Kasaï Ce ntral et de Lomami ZR-COREF-379128-GO-RFB / Acquisition de 400 motos po Component 2. Supporting ur les régies financières prov Resource Management at th Single Stage - One En cours d'e IDA / 70200 A priori Appel d'offres Open - National 2,000,000.00 0.00 2023-09-29 2023-10-27 2023-10-04 2023-10-30 2023-11-15 2023-12-04 2023-12-15 2024-02-19 2024-01-19 2024-07-17 inciales du Kasaï Oriental, Ka e Provincial Government Lev Envelope xécution saï Central, Kasaï et Lomami el (à raison de 100 par provinc e) ZR-COREF-379130-GO-RFB / Acquisition des Mobiliers de Component 3. Project and C Single Stage - One En attente d' bureau pour la Coordination IDA / 70200 hange Management, and E A posteriori Appel d'offres Open - National 350,000.00 0.00 2023-09-18 2023-09-23 2023-11-04 2023-12-04 2024-01-08 2024-07-06 Envelope exécution nationale et les coordination mergency Response s provinciales du Projet ENC ORE ZR-COREF-379131-GO-RFB / Component 3. Project and C Single Stage - One En attente d' Acquisition des matériels, log IDA / 70200 hange Management, and E A posteriori Appel d'offres Open - National 300,000.00 0.00 2023-10-09 2023-10-14 2023-11-25 2023-12-25 2024-01-29 2024-07-27 Envelope exécution iciels et installation d'un rése mergency Response au local mixte ZR-COREF-362720-GO-RFB / Fourniture, installation et la mise en marche du datacent Component 2. Supporting er de secours au bâtiment ad Resource Management at th Single Stage - One IDA / 70200 A posteriori Appel d'offres Open - National 216,000.00 0.00 Annulé 2023-07-03 2023-07-08 2023-08-19 2023-09-18 2023-10-23 2024-04-20 ministratif de la fonction pub e Provincial Government Lev Envelope lique du système intégré de el gestion des ressources huma ines et de la paie de l'admini stration publique ZR-COREF-345479-GO-RFQ / Component 1. Strengthenin Acquisition de 40 machines s g Public Resources Manage Single Stage - One canners pour la numérisation IDA / 70200 A posteriori Demande de prix Limited 48,000.00 0.00 Annulé 2023-04-20 2023-06-15 2023-12-12 ment at Central Governmen Envelope des actes administratifs de f t Level onctionnaires en provinces e t au niveau central ZR-COREF-345482-GO-RFQ / Component 1. Strengthenin Single Stage - One Acquisition des 80 lecteurs d' IDA / 70200 g Public Resources Manage A posteriori Demande de prix Limited 12,000.00 0.00 Annulé 2023-04-06 2023-06-01 2023-11-28 Envelope empreintes pour identificatio ment at Central Governmen n biométrique t Level ZR-COREF-345551-GO-RFQ / Acquisition des matériels inf Component 2. Supporting ormatiques en faveur des ad Resource Management at th Single Stage - One IDA / 70200 A posteriori Demande de prix Limited 250,000.00 0.00 Annulé 2023-06-28 2023-08-23 2024-02-19 ministrations fiscales Provinc e Provincial Government Lev Envelope iales du Kasaï Oriental, du Ka el saï, du Kasaï Central et de Lo mami ZR-COREF-345556-GO-RFQ / Acquisition des mobiliers des Component 2. Supporting bureaux en faveur des admin Resource Management at th Single Stage - One IDA / 70200 A posteriori Demande de prix Limited 250,000.00 0.00 Annulé 2023-06-25 2023-08-20 2024-02-16 istrations fiscales Provinciale e Provincial Government Lev Envelope s du Kasaï Oriental, du Kasaï el , du Kasaï Central et de Lom ami ZR-COREF-345557-GO-RFQ / Acquisition des fournitures d Component 2. Supporting es bureaux et consommables Resource Management at th Single Stage - One IDA / 70200 A posteriori Demande de prix Limited 110,000.00 0.00 Annulé 2023-07-20 2023-09-14 2024-03-12 informatiques pour les régies e Provincial Government Lev Envelope provinciales du Kasaï Orient el al, du Kasaï, du Kasaï Central et de Lomami ZR-COREF-345473-GO-RFQ / Component 1. Strengthenin Single Stage - One Acquisition des mobiliers pou IDA / 70200 g Public Resources Manage A posteriori Demande de prix Limited 200,000.00 0.00 Annulé 2023-04-10 2023-06-05 2023-12-02 Envelope r les 6 directions de la DGRH ment at Central Governmen réhabilitées t Level ZR-COREF-264864-GO-RFQ / Component 1. Strengthenin Acquisition et déploiement d g Public Resources Manage Single Stage - One es matériels auprès des utilis / A posteriori Demande de prix Limited 40,000.00 0.00 Annulé 2022-01-15 2022-02-25 2022-04-26 ment at Central Governmen Envelope ateurs de SIGMAP dans 20 n t Level ouveaux cellules identifiées Page 3 ZR-COREF-296208-GO-RFQ / Component 1. Strengthenin Marché de fourniture de mob g Public Resources Manage Single Stage - One IDA / V4000 A posteriori Demande de prix Limited 70,000.00 0.00 Annulé 2022-06-22 2022-07-22 2022-08-21 ilier de bureaux pour équiper ment at Central Governmen Envelope les nouveaux locaux de la D t Level GRH-DBDR ZR-COREF-378682-GO-RFQ / Acquisition des matériels inf Component 3. Project and C ormatiques et matériels de r Single Stage - One En attente d' IDA / 70200 hange Management, and E A posteriori Appel d'offres Open - National 200,000.00 0.00 2023-10-10 2023-10-15 2023-11-26 2023-12-10 2024-01-14 2024-07-12 eprographie complémentaire Envelope exécution mergency Response s de la Coordination national e et les coordinations provin ciales du Projet ENCORE ZR-COREF-379120-GO-DIR / Component 2. Supporting Production et Impression des Resource Management at th Passation de mar En attente d' annuaires alphabétiques et n IDA / 70200 A posteriori Direct - National 350,000.00 0.00 2023-10-05 2023-10-10 2023-11-14 2024-05-12 e Provincial Government Lev ché de gré à gré exécution umériques de tous les agent el s de carrière certifiés régulie rs dans le fichier FRAP ZR-COREF-409335-GO-RFB / Component 1. Strengthenin Acquisition des matériels inf g Public Resources Manage Single Stage - One En cours d'e IDA / 70200 A priori Appel d'offres Open - National 2,400,000.00 0.00 2024-03-10 2024-03-17 2024-03-10 2024-03-20 2024-05-19 2024-06-18 2024-07-23 2026-01-14 ormatique au profit des servi ment at Central Governmen Envelope xécution ces d'assiettes pour l'utilisati t Level on du LOGIRAD ZR-COREF-410269-GO-RFQ / Component 1. Strengthenin Single Stage - One En attente d' Acquisition de petites fournit IDA / 70200 g Public Resources Manage A posteriori Demande de prix Limited - National 50,000.00 0.00 2024-02-23 2024-03-24 2024-04-23 Envelope exécution ures pour le CSP ment at Central Governmen t Level ZR-COREF-410273-GO-RFQ / Component 1. Strengthenin Acquisition des matériels inf g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited - National 350,000.00 0.00 2024-02-23 2024-03-28 2024-04-27 ormatiques et consommable ment at Central Governmen Envelope exécution s pour le Conseil Supérieur d t Level u Porte feuille CSP ZR-COREF-378590-GO-RFQ / Acquisition de 5 Groupes éle Component 1. Strengthenin ctrogènes dont quatre de 15 g Public Resources Manage Single Stage - One En attente d' KVA pour les coordinations p IDA / 70200 A posteriori Demande de prix Limited - National 185,000.00 0.00 2024-03-24 2024-05-12 2024-06-11 ment at Central Governmen Envelope exécution rovinciales (à raison 1 par pr t Level ovince) et un de 30 KVA pour la salle machine SIGMAP au Ministère de Budget ZR-COREF-410639-GO-RFQ / Acquisition des matériels inf Component 3. Project and C ormatiques et matériels de r Single Stage - One En attente d' IDA / 70200 hange Management, and E A posteriori Demande de prix Limited - National 300,000.00 0.00 2024-03-01 2024-04-19 2024-05-19 eprographie complémentaire Envelope exécution mergency Response s de la Coordination national e et les coordinations provin ciales du Projet ENCORE ZR-COREF-411790-GO-RFB / Acquisition des Mobiliers de Component 1. Strengthenin bureau en deux lots distincts g Public Resources Manage Single Stage - One En attente d' : IDA / 70200 A posteriori Appel d'offres Open - National 600,000.00 0.00 2024-03-17 2024-03-17 2024-05-26 2024-06-25 2024-07-30 2026-01-21 ment at Central Governmen Envelope exécution Lot 1 : Pour la Coordination n t Level ationale et coordinations pro vinciales du Projet ENCORE Lot 2 : Pour le CSP ZR-COREF-411792-GO-RFB / Acquisition des équipements Component 1. Strengthenin informatiques (80 lecteurs d' g Public Resources Manage Single Stage - One En attente d' empreintes pour identificatio IDA / 70200 A posteriori Appel d'offres Open - National 1,300,000.00 0.00 2024-03-24 2024-03-24 2024-06-02 2024-07-02 2024-08-06 2026-01-28 ment at Central Governmen Envelope exécution n biométrique et 80 machine t Level s d'impression des cartes) en faveur de la Fonction Publiqu e (DBDR) ZR-COREF-411793-GO-RFB / Acquisition des fournitures d e bureau en deux lots distinc Component 1. Strengthenin ts : g Public Resources Manage Single Stage - One En attente d' Lot 1 : Pour les 12 DAF des IDA / 70200 A posteriori Appel d'offres Open - National 800,000.00 0.00 2024-03-24 2024-03-24 2024-06-02 2024-07-02 2024-08-06 2026-01-28 ment at Central Governmen Envelope exécution ministères de la 1ère vague ( t Level Dév. rural, Agri., FP, Portefeu ille, Envir, ITPR, EPSP, Plan, B udget, Santé, Finances et Pri mature) Lot 2: Pour les 20 nouvel. C ZR-COREF-411795-GO-RFB / GPMP Acquisition des mobiliers de bureau en trois lots distincts : Component 1. Strengthenin Lot 1 : Pour les 4 nouv. centr g Public Resources Manage Single Stage - One IDA / 70200 A posteriori Appel d'offres Open - National 1,420,000.00 0.00 Annulé 2024-03-24 2024-03-24 2024-06-02 2024-07-02 2024-08-06 2026-01-28 es d'ord. ment at Central Governmen Envelope Lot 2 : Pour les 12 DAF des t Level min de la 1ère vag. Lot 3 : Pour les postes compt ables des 4 min. expéri de la déconc. de l'ordon (EPST, Sa nté, ITPR et Dév ZR-COREF-411799-GO-RFB / Production et Impression des documents en deux lots disti ncts : Component 1. Strengthenin Lot 1 : Manuel des procédure g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 450,000.00 0.00 2024-04-14 2024-04-14 2024-06-23 2024-07-23 2024-08-27 2026-02-18 s administratives et financièr ment at Central Governmen Envelope exécution es des DAF t Level Lot 2 : Annuaires alphabétiq ues et numériques de tous le s agents de carrière certifiés réguliers dans le fichier FRAP ZR-COREF-410616-GO-RFB / Acquisition des équipements informatiques et consommab Component 1. Strengthenin les en faveur des douze DAF g Public Resources Manage Single Stage - One En cours d'e des ministères de la 1ère va IDA / 70200 A priori Appel d'offres Open - National 2,060,000.00 0.00 2024-03-24 2024-03-17 2024-03-24 2024-03-21 2024-06-02 2024-07-02 2024-08-06 2026-01-28 ment at Central Governmen Envelope xécution gue (Développement rural, A t Level griculture, Fonction Publique, Portefeuille, Environnement, ITPR, EPSP, Plan, Budget, Sa nté, Finances et Primature) ZR-COREF-413852-GO-RFB / Acquisition des mobiliers de Component 1. Strengthenin bureau en deux lots distincts g Public Resources Manage Single Stage - Two En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 1,320,000.00 0.00 2024-03-11 2024-04-10 2024-05-10 2024-07-08 2024-08-12 2026-02-03 : Lot 1 : Pour les 4 nouv. cent ment at Central Governmen Envelope exécution res d'ord. Lot 2 : Pour les 12 t Level DAF des min de la 1ère vagu e ZR-COREF-413854-GO-RFB / Component 1. Strengthenin Acquisition des matériels inf g Public Resources Manage Single Stage - Two En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 1,000,000.00 0.00 2024-03-11 2024-04-01 2024-05-01 2024-07-14 2024-08-18 2026-02-09 ormatiques et consommable ment at Central Governmen Envelope exécution s en faveur des 20 nouvelles t Level CGPMP ZR-COREF-413868-GO-RFB / Acquisition des mobiliers de bureau en deux lots distincts Component 1. Strengthenin : g Public Resources Manage Single Stage - Two En attente d' Lot1: Pour les 20 nouvelles C IDA / 70200 A posteriori Appel d'offres Open - National 1,100,000.00 0.00 2024-03-30 2024-04-29 2024-05-29 2024-07-27 2024-08-31 2026-02-22 ment at Central Governmen Envelope exécution GPMP t Level Lot 2: Pour les postes compt ables des 4 ministères expéri mentaux de la déconcentrati on de l'ordonnancement (EP ST, Santé, ITPR, Dev. Rural ZR-COREF-414126-GO-RFB / Acquisition des équipements informatiques pour les 4 nou Component 1. Strengthenin veaux centres d'ordonnance g Public Resources Manage Single Stage - One En cours d'e IDA / 70200 A posteriori Appel d'offres Open - National 700,000.00 0.00 2024-04-07 2024-03-20 2024-04-07 2024-04-03 2024-06-16 2024-07-16 2024-08-20 2026-02-11 ment et pour le renforcemen ment at Central Governmen Envelope xécution t du système d'information d t Level e la chaîne de la dépense (E SU, Défense, Agriculture, Pêc he et Elevage) ZR-COREF-414130-GO-RFB / Recrutement d'une firme po Component 1. Strengthenin ur assurer la maintenance de g Public Resources Manage Single Stage - Two IDA / 70200 A priori Appel d'offres Open - National 500,000.00 0.00 Annulé 2024-04-21 2024-04-21 2024-06-30 2024-10-17 2026-04-10 s équipements déployés dan ment at Central Governmen Envelope s 75 administrations et 10 pr t Level ovinces dans le cadre du SG RH-Paie ZR-COREF-414135-GO-RFQ / Component 1. Strengthenin Acquisition du système élect g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Open - National 350,000.00 0.00 2024-04-07 2024-04-07 2024-04-07 ronique d'archivage des doss ment at Central Governmen Envelope exécution iers des marchés publics t Level ZR-COREF-414431-GO-RFQ / Component 3. Project and C Single Stage - One En attente d' Acquisition des matériels, log IDA / 70200 hange Management, and E A posteriori Demande de prix Limited - National 350,000.00 0.00 2024-04-08 2024-05-30 2024-06-29 Envelope exécution iciels et installation d'un rése mergency Response au local mixte Page 4 ZR-COREF-417544-GO-RFB / Recrutement d'une firme po Component 1. Strengthenin ur assurer la maintenance de g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Appel d'offres Open - National 500,000.00 0.00 2024-05-26 2024-05-26 2024-08-04 2024-09-03 2024-10-08 2026-04-01 s équipements déployés dan ment at Central Governmen Envelope exécution s 75 administrations et 10 pr t Level ovinces dans le cadre du SG RH-Paie ZR-COREF-418187-GO-RFQ / Acquisition des fournitures d e bureaux et consommables Component 2. Supporting informatiques en faveur des Resource Management at th Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited - National 300,000.00 0.00 2024-04-28 2024-04-28 2024-04-28 Services intervenant dans la e Provincial Government Lev Envelope exécution chaîne de la dépense du Kas el aï Oriental, du Kasaï, du Kasa ï Central et de Lomami (marc hé en 2 lots) ZR-COREF-418254-GO-RFQ / Component 1. Strengthenin Acquisition des mobiliers de g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited - National 100,000.00 0.00 2024-04-28 2024-04-28 2024-04-28 bureau pour le Conseil Supér ment at Central Governmen Envelope exécution ieur du Porte feuille (CSP) t Level ZR-COREF-414138-NC-RFQ / Acquisition d'un logiciel de g Component 3. Project and C estion du PTBA et des compo Single Stage - One IDA / 70200 hange Management, and E A posteriori Demande de prix Open - National 100,000.00 0.00 Annulé 2024-04-07 2024-04-07 2024-04-07 santes de suivi et évaluation Envelope mergency Response du projet ENCORE, y compris les PBC (conception, installat ion et formation) ZR-COREF-421082-GO-RFQ / Component 3. Project and C Acquisition d'un groupe Elect Single Stage - One En attente d' IDA / 70200 hange Management, and E A posteriori Demande de prix Limited - National 40,000.00 0.00 2024-04-10 2024-04-10 2024-04-10 rogène de 150 kva pour la co Envelope exécution mergency Response ordination nationale du proje t ENCORE ZR-COREF-414134-GO-RFB / Component 1. Strengthenin Acquisition et déploiement d g Public Resources Manage Open - Internationa Single Stage - Two IDA / 70200 A priori Appel d'offres 3,000,000.00 0.00 Annulé 2024-04-07 2024-04-07 2024-06-16 2024-08-29 2024-10-03 2026-03-27 e la solution électronique de ment at Central Governmen l Envelope gestion des marchés publics t Level (e-GP) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pr Prequalification Estimated Am Actual Amount Process St Draft Pre-qualificatio Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission Description Component Review Type Method and Recommendatio Signed Contract Contract Completion o. h ocess (Y/N) ount (US$) (US$) atus n Documents ation Report ent / Justification Notice / Invitation s Issued / Opening / Minutes n for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-COREF-264873-NC-DIR / Component 3. Project and C Passation de mar Recrutement d'un prestatair IDA / 70200 hange Management, and E A posteriori Direct 9,600.00 9,600.00 Achevé 2021-12-10 2021-12-20 2021-12-15 2021-12-20 2021-12-31 2022-01-02 2022-04-30 2022-05-13 ché de gré à gré e de service d'entretien des mergency Response bureaux ZR-COREF-264876-NC-DIR / Component 3. Project and C Recrutement d'un prestatair Passation de mar IDA / 70200 hange Management, and E A posteriori Direct 12,000.00 12,000.00 Achevé 2021-12-15 2021-12-20 2021-12-20 2021-12-20 2021-12-31 2022-01-02 2022-04-30 2022-04-29 e pour le service de gardienn ché de gré à gré mergency Response age des bureaux de la Coordi nation nationale ZR-COREF-264970-NC-RFQ / Component 3. Project and C Single Stage - One Service d'assurance médical / hange Management, and E A posteriori Demande de prix Limited 50,000.00 0.00 Annulé 2021-12-08 2022-01-06 2022-04-27 Envelope e pour le personnel du Projet mergency Response (Période du PPA) ZR-COREF-296507-NC-DIR / Renouvellement contrat pres Component 3. Project and C Passation de mar tataire de service d'entretien IDA / 70200 hange Management, and E A posteriori Direct 7,200.00 7,200.00 Achevé 2022-05-23 2022-05-23 2022-05-25 2022-05-23 2022-05-29 2022-06-03 2022-07-31 2022-08-21 ché de gré à gré et nettoyage des bureaux (d mergency Response e Mai à Juillet 2022) - BAM'S CLEAN ZR-COREF-296508-NC-DIR / Renouvellement contrat du p restataire pour le service de Component 3. Project and C Passation de mar gardiennage et sécurité des IDA / 70200 hange Management, and E A posteriori Direct 9,000.00 9,000.00 Achevé 2022-05-23 2022-05-23 2022-05-25 2022-05-23 2022-05-29 2022-06-03 2022-07-31 2022-07-29 ché de gré à gré bureaux de la Coordination N mergency Response ationale du Projet ENCORE (d e Mai à Juin 2022) - ATALANT E GROUP ZR-COREF-316188-NC-DIR / Component 3. Project and C Renouvellement contrat du p Passation de mar IDA / 70200 hange Management, and E A posteriori Direct - National 40,000.00 0.00 Signé 2022-09-20 2022-11-30 2022-09-22 2022-12-14 2022-09-26 2022-12-23 2023-09-26 restataire de service de nett ché de gré à gré mergency Response oyage des bureaux ZR-COREF-316202-NC-DIR / Renouvellement contrat du p Component 3. Project and C Passation de mar restataire de service de gard IDA / 70200 hange Management, and E A posteriori Direct - National 40,000.00 0.00 Signé 2022-09-20 2022-11-30 2022-09-22 2022-12-14 2022-09-26 2022-12-23 2023-07-31 ché de gré à gré iennage et sécurité des bure mergency Response aux de la Coordination Natio nale du Projet ZR-COREF-345709-NC-RFQ / Sélection d'une maison de pr Component 3. Project and C oduction (agence de presse) Single Stage - One En attente d' IDA / 70200 hange Management, and E A posteriori Demande de prix Limited 20,000.00 0.00 2023-04-22 2023-06-17 2023-12-14 pour la prise des images, la c Envelope exécution mergency Response onception d'un documentaire sur le lancement du projet d ans les 5 sites et sa diffusion ZR-COREF-345004-NC-DIR / Renouvellement contrat du p Component 3. Project and C restataire de service de gard Passation de mar En attente d' IDA / 70200 hange Management, and E A posteriori Direct - National 40,000.00 0.00 2023-07-15 2023-07-25 2023-07-31 2024-07-30 iennage et sécurité des bure ché de gré à gré exécution mergency Response aux de la Coordination Natio nale du Projet avec ATALAN T Group ZR-COREF-345000-NC-DIR / Contrat de prestation de serv Component 3. Project and C Passation de mar En attente d' ice de nettoyage des bureau IDA / 70200 hange Management, and E A posteriori Direct - National 40,000.00 0.00 2023-07-15 2023-07-25 2023-07-29 2024-07-28 ché de gré à gré exécution x de la Coordination du Proje mergency Response t ENCORE, Etablissement BA M’S CLEAN ZR-COREF-356049-NC-RFQ / Fourniture, installation et par Component 1. Strengthenin amétrage du réseau dans les g Public Resources Manage Single Stage - One En attente d' IDA / 70200 A posteriori Demande de prix Limited 100,000.00 0.00 2023-05-04 2023-06-29 2023-12-26 4 centres d'ordonnancement ment at Central Governmen Envelope exécution des Mininistères: Santé, EPS t Level T, ITPR, et Développement ru ral ZR-COREF-378721-NC-DIR / Service d'une agence de co mmunication pour la product Component 3. Project and C Passation de mar En attente d' ion d'un magazine radiotélév IDA / 70200 hange Management, and E A posteriori Direct - National 30,000.00 0.00 2023-09-05 2023-09-07 2023-09-11 2024-09-10 ché de gré à gré exécution isé trimestriel sur le process mergency Response us de réforme des finances p ubliques avec la participation des parties prenantes avec A GEM ZR-COREF-378867-NC-DIR / Service d'une agence de co mmunication pour la prise de Component 3. Project and C Passation de mar En attente d' s images, la conception d'un IDA / 70200 hange Management, and E A posteriori Direct - National 40,000.00 0.00 2023-09-15 2023-09-17 2023-09-21 2024-09-20 ché de gré à gré exécution documentaire sur le lanceme mergency Response nt du projet dans les 5 sites et sa diffusion avec l'agence RCT (Radio Contrôle Télévisi on) CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amoun Expression of Interes Short List and Draft R Request for Proposal Opening of Technical Evaluation of Techni Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) t (US$) t Notice equest for Proposals s as Issued Proposals / Minutes cal Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ZR-COREF-264820-CS-CQS / Component 1. Strengthenin Sélection fondée Sélection d'un Cabinet Inter g Public Resources Manage sur les qualificatio Open - Internationa national pour le développem IDA / 70200 A posteriori 150,000.00 145,400.00 Signé 2021-12-10 2021-12-16 2022-01-09 2022-01-06 2022-01-24 2022-03-24 2022-02-03 2022-04-05 2022-02-13 2022-05-26 2022-04-29 ment at Central Governmen ns des consultant l ent de la stratégie de mise e t Level s n œuvre d'une solution e-GP ZR-COREF-264866-CS-CQS / Sélection fondée Sélection d'un Cabinet pour l Component 3. Project and C sur les qualificatio a rédaction du manuel des pr IDA / 70200 hange Management, and E A posteriori Open - National 50,000.00 47,410.00 Achevé 2021-12-22 2021-12-16 2022-01-05 2021-12-23 2022-01-25 2022-03-01 2022-02-01 2022-03-14 2022-02-18 2022-03-19 2022-04-29 2022-07-15 ns des consultant océdures de gestion financiè mergency Response s re et de la passation des mar chés du Projet ENCORE ZR-COREF-264867-CS-CQS / Sélection fondée Component 3. Project and C Sélection d'un Cabinet Web sur les qualificatio IDA / 70200 hange Management, and E A posteriori Open - National 15,000.00 0.00 Signé 2021-12-20 2022-01-25 2022-01-03 2022-01-23 2022-03-16 2022-02-02 2022-05-30 2022-02-19 2022-06-09 2022-04-30 master pour la mise en place ns des consultant mergency Response du Site WEB du Projet ENCO s RE Page 5 ZR-COREF-265013-CS-CQS / Component 2. Supporting Sélection fondée Sélection d'un Cabinet Web Resource Management at th sur les qualificatio IDA / 70200 A posteriori Open - National 45,000.00 44,554.80 Signé 2021-12-20 2022-01-25 2022-01-03 2022-01-23 2022-03-16 2022-01-28 2022-05-30 2022-02-17 2022-06-06 2022-04-30 master pour la mise en place e Provincial Government Lev ns des consultant du Site WEB de 4 provinces s el s électionnées ZR-COREF-296044-CS-QCBS Component 1. Strengthenin / Sélection d'un Consultant fi Sélection fondée g Public Resources Manage Open - Internationa En cours d'exécut rme pour accompagner la mi IDA / 70200 A priori sur la qualité et le 2,000,000.00 0.00 2022-06-15 2022-06-13 2022-07-30 2022-06-23 2022-09-03 2023-07-13 2022-10-03 2023-09-18 2022-10-24 2023-11-13 2022-11-17 2022-12-22 2024-12-21 ment at Central Governmen l ion se en service effective des st coût t Level ructures de la DGTCP ZR-COREF-264863-CS-LCS / Sélection d'un Cabinet indép Component 3. Project and C Sélection au moin Open - Internationa endant pour l'Audit financier / hange Management, and E A posteriori 25,000.00 0.00 Annulé 2021-12-10 2021-12-31 2022-01-21 2022-02-18 2022-02-25 2022-03-17 2022-03-31 2022-06-29 dre coût l externe sur la gestion fiducia mergency Response ire du PPA clos au 30/04/202 2 ZR-COREF-344156-CS-QCBS / Recrutement d'un Consulta nt International firme pour le Component 1. Strengthenin Sélection fondée renforcement de capacités d g Public Resources Manage Open - Internationa En attente d'exéc IDA / 70200 A posteriori sur la qualité et le 150,000.00 0.00 2023-04-20 2023-05-11 2023-06-24 2023-07-22 2023-08-21 2023-09-25 2023-10-30 2024-10-29 es membres de la Commissio ment at Central Governmen l ution coût n interministérielle de la vali t Level dation des études de faisabili té d'un projet minier avec la participation des OSC ZR-COREF-344187-CS-QCBS / Recrutement d'un Cabinet i Component 1. Strengthenin nternational pour évaluer le Sélection fondée g Public Resources Manage Open - Internationa En cours d'exécut s besoins en renforcement d IDA / 70200 A posteriori sur la qualité et le 180,000.00 0.00 2023-03-18 2023-06-21 2023-04-08 2023-08-17 2023-05-13 2023-06-10 2023-07-01 2023-08-05 2023-09-09 2024-09-08 ment at Central Governmen l ion e capacités des services inte coût t Level rvenant dans la gestion des r evenus miniers et autres par ties prenantes ZR-COREF-344190-CS-QCBS / Recrutement d'un Cabinet i Component 1. Strengthenin nternational pour évaluer le Sélection fondée g Public Resources Manage Open - Internationa En attente d'exéc s besoins techniques en renf IDA / 70200 A posteriori sur la qualité et le 180,000.00 0.00 2023-03-15 2023-04-05 2023-05-10 2023-06-07 2023-07-07 2023-08-11 2023-09-15 2024-09-14 ment at Central Governmen l ution orcement de capacités de la coût t Level Commission interministériell e d'harmonisation et de cons olidation des statistiques min ières ZR-COREF-344276-CS-QCBS / Recrutement d’une Cabinet International devant appuyer Component 1. Strengthenin le gouvernement à : (i) défini Sélection fondée g Public Resources Manage Open - Internationa En attente d'exéc r le nouveau cadre organisati IDA / 70200 A posteriori sur la qualité et le 180,000.00 0.00 2023-04-10 2023-05-01 2023-06-05 2023-07-03 2023-07-24 2023-08-28 2023-10-02 2024-10-01 ment at Central Governmen l ution onnel et juridique, (ii) élabor coût t Level er le manuel de procédures des dépenses non salariales ; (iii) proposer l'adaption de l a chaîne de dépense/sys ZR-COREF-344288-CS-QCBS / Recrutement d'un cabinet p Component 1. Strengthenin Sélection fondée our assurer la formation des g Public Resources Manage Open - Internationa En attente d'exéc IDA / 70200 A posteriori sur la qualité et le 400,000.00 0.00 2023-04-03 2023-04-24 2023-05-29 2023-06-26 2023-07-17 2023-08-21 2023-09-25 2024-09-24 DAF suivant plan de formatio ment at Central Governmen l ution coût n sur une période de 6 mois ( t Level suivant les modules et group es) ZR-COREF-344335-CS-QCBS / Recrutement d'une Firme c Component 1. Strengthenin hargée d'appuyer le Ministèr Sélection fondée g Public Resources Manage Open - Internationa En cours d'exécut e de la Fonction Publique en IDA / 70200 A posteriori sur la qualité et le 600,000.00 0.00 2023-03-27 2023-04-21 2023-04-17 2023-05-31 2023-06-28 2023-07-28 2023-09-01 2023-10-06 2024-10-05 ment at Central Governmen l ion matière de la méthologie et coût t Level planification de la constitutio n du Fichier de Référence de l'Administration Publique ZR-COREF-344343-CS-QCBS Component 1. Strengthenin Sélection fondée / Recrutement d'une Firme p g Public Resources Manage Open - Internationa En cours d'exécut IDA / 70200 A priori sur la qualité et le 1,300,000.00 0.00 2023-03-15 2023-04-05 2023-05-19 2023-06-16 2023-07-16 2023-08-20 2023-09-24 2024-09-23 our la constitution du Fichier ment at Central Governmen l ion coût de Référence de l'Administra t Level tion Publique ZR-COREF-344418-CS-QCBS / Recrutement d’une firme p our l'assistance en maître d' Component 1. Strengthenin ouvrage du SIGeFiP avec le n Sélection fondée g Public Resources Manage Open - Internationa En attente d'exéc oyau composé des modules IDA / 70200 A posteriori sur la qualité et le 150,000.00 0.00 2023-05-08 2023-05-29 2023-07-12 2023-08-09 2023-09-08 2023-10-13 2023-11-17 2024-11-16 ment at Central Governmen l ution comptable et budgétaire (étu coût t Level des préalables et analyse de s besoins complémentaires e n renforcement de capacités et en équipements pour la m ise en pla ZR-COREF-344472-CS-LCS / Component 1. Strengthenin Recrutement d'un cabinet int g Public Resources Manage Sélection au moin Open - Internationa En attente d'exéc IDA / 70200 A posteriori 160,000.00 0.00 2023-04-05 2023-04-26 2023-06-09 2023-07-07 2023-08-06 2023-09-10 2023-10-15 2024-01-13 ernational chargé de l'audit i ment at Central Governmen dre coût l ution ndépendant en PPP (exercice t Level 2019-2022) ZR-COREF-344478-CS-QCBS / Recrutement d’un consulta Component 1. Strengthenin nt sénior international pour l’ Sélection fondée g Public Resources Manage Open - Internationa En cours d'exécut élaboration de la stratégie d IDA / 70200 A posteriori sur la qualité et le 100,000.00 0.00 2023-03-22 2023-05-20 2023-04-12 2023-05-26 2023-06-23 2023-07-23 2023-08-27 2023-10-01 2023-11-30 ment at Central Governmen l ion e renforcement des capacité coût t Level s, de formation et de professi onnalisation des acteurs nati onaux de la commande publ ique. ZR-COREF-344507-CS-QCBS Component 1. Strengthenin Sélection fondée / Recrutement d'une firme p g Public Resources Manage En cours d'exécut IDA / 70200 A posteriori sur la qualité et le Open - National 300,000.00 0.00 2023-03-20 2023-04-10 2023-04-10 2023-05-24 2023-06-21 2023-07-21 2023-08-25 2023-09-29 2023-12-28 our réaliser l'audit organisati ment at Central Governmen ion coût onnel du Conseil Supérieur d t Level u Portefeuille (CSP) ZR-COREF-344884-CS-QCBS / Recrutement d'un Cabinet pour assistance-métier et tec Component 2. Supporting hnique pour la mise en place Sélection fondée Resource Management at th Open - Internationa En attente d'exéc d'un système d'informations IDA / 70200 A posteriori sur la qualité et le 500,000.00 0.00 2023-04-05 2023-04-26 2023-06-09 2023-07-07 2023-08-06 2023-09-10 2023-10-15 2024-10-14 e Provincial Government Lev l ution de collecte des prélèvements coût el fiscaux et non fiscaux dans l es 4 provinces (du Kasaï Orie ntal, du Kasaï, du Kasaï Cent ral et de Lomami) ZR-COREF-345075-CS-CQS / Sélection fondée Component 3. Project and C Recrutement d’une ONG spé sur les qualificatio En cours d'exécut IDA / 70200 hange Management, and E A posteriori Open - National 300,000.00 0.00 2023-04-07 2023-04-11 2023-04-28 2023-06-11 2023-07-11 2023-08-15 2024-02-11 cialisée en VBG pendant la m ns des consultant ion mergency Response ise en œuvre du projet s ZR-COREF-344126-CS-QCBS / Recrutement d'un Consulta Component 1. Strengthenin nt International firme pour la Sélection fondée g Public Resources Manage Open - Internationa En cours d'exécut réalisation de l'étude sur le p IDA / 70200 A posteriori sur la qualité et le 100,000.00 0.00 2023-04-15 2023-09-27 2023-04-29 2023-10-25 2023-06-03 2023-07-01 2023-07-03 2023-08-07 2023-09-11 2024-09-10 ment at Central Governmen l ion otentiel fiscal du secteur min coût t Level ier de la République Démocr atique du Congo y compris l' analyse et l'audit du régime f iscal ZR-COREF-356052-CS-CQS / Recrutement d’un Cabinet in Sélection fondée ternational chargé d' (i) éval Component 3. Project and C sur les qualificatio Open - Internationa En cours d'exécut uation environnementale et IDA / 70200 hange Management, and E A posteriori 400,000.00 0.00 2023-04-25 2023-05-12 2023-05-16 2023-06-29 2023-07-29 2023-09-02 2024-02-29 ns des consultant l ion sociale stratégique et (ii) éva mergency Response s luation du partage des bénéf ices de l’exploitation minière avec les communautés local es ZR-COREF-355930-CS-CQS / Sélection fondée Recrutement d'un cabinet ch Component 3. Project and C sur les qualificatio Open - Internationa En cours d'exécut argé de l'audit financier et co IDA / 70200 hange Management, and E A posteriori 50,000.00 0.00 2023-04-18 2023-04-24 2023-05-09 2023-06-22 2023-07-22 2023-08-26 2024-02-22 ns des consultant l ion mptable du Projet ENCORE p mergency Response s our l'exercice clos 2022 com prenant aussi le PPA ZR-COREF-355935-CS-QCBS / Recrutement d'un cabinet c Component 3. Project and C Sélection fondée Open - Internationa En cours d'exécut hargé de l'audit financier et c IDA / 70200 hange Management, and E A posteriori sur la qualité et le 150,000.00 0.00 2023-05-05 2023-09-28 2023-05-26 2023-11-20 2023-06-11 2023-07-09 2023-08-08 2023-09-12 2023-10-17 2024-10-16 l ion omptable du Projet ENCORE mergency Response coût pour les Exercices 2023, 202 4 et 2025 ZR-COREF-345046-CS-QCBS Component 3. Project and C Sélection fondée Open - Internationa / Recrutement d'un auditeur IDA / 70200 hange Management, and E A posteriori sur la qualité et le 120,000.00 0.00 Annulé 2023-03-10 2023-03-16 2023-03-31 2023-04-16 2023-05-14 2023-06-13 2023-07-18 2023-08-22 2024-08-21 l externe (cabinet) mergency Response coût ZR-COREF-369149-CS-CQS / Recrutement d'un cabinet in Component 1. Strengthenin Sélection fondée dépendant chargé d'évaluer l g Public Resources Manage sur les qualificatio Open - Internationa En cours d'exécut IDA / 70200 A posteriori 300,000.00 0.00 2023-06-28 2023-07-13 2023-07-19 2023-08-17 2023-09-01 2023-10-01 2023-11-05 2024-05-03 e niveau d'exécution des réf ment at Central Governmen ns des consultant l ion ormes engagées par les entr t Level s eprises publiques du secteur extractif Page 6 ZR-COREF-368173-CS-CQS / Recrutement du cabinet inte Component 1. Strengthenin Sélection fondée rnational chargé d'élaborer l g Public Resources Manage sur les qualificatio Open - Internationa En cours d'exécut IDA / 70200 A posteriori 400,000.00 0.00 2023-06-28 2023-07-10 2023-07-19 2023-08-17 2023-09-01 2023-10-01 2023-11-05 2024-05-03 e rapport ITIE sur l'exploitati ment at Central Governmen ns des consultant l ion on minière artisanale et à pe t Level s tite échelle dans la filière dia mant au Kasaï Oriental et au Kasaï ZR-COREF-368478-CS-CQS / Recrutement d'un consultant Sélection fondée (firme) chargé d'(I) évaluatio Component 3. Project and C sur les qualificatio Open - Internationa En cours d'exécut n environnementale et social IDA / 70200 hange Management, and E A posteriori 400,000.00 0.00 2023-06-28 2023-07-14 2023-07-19 2023-09-01 2023-10-01 2023-11-05 2024-05-03 ns des consultant l ion e stratégique et (II) évaluatio mergency Response s n du partage des bénéfices d e l'exploitation minière avec les communautés locales ZR-COREF-379132-CS-QCBS / Recrutement d'un consulta Component 3. Project and C Sélection fondée nt firme chargée de l'audit d Open - Internationa En attente d'exéc IDA / 70200 hange Management, and E A posteriori sur la qualité et le 350,000.00 0.00 2023-10-06 2023-10-27 2023-12-10 2024-01-07 2024-02-06 2024-03-12 2024-04-16 2025-04-16 es dépenses éligibles au pro l ution mergency Response coût gramme (PDE) pour la périod e allant du 1er mars au 31 d écembre 2024 ZR-COREF-379133-CS-CQS / Component 1. Strengthenin Sélection fondée Recrutement d'un cabinet int g Public Resources Manage sur les qualificatio Open - Internationa En attente d'exéc ernational pour le renforcem IDA / 70200 A posteriori 350,000.00 0.00 2023-10-05 2023-10-26 2023-12-09 2024-01-08 2024-02-12 2024-08-10 ment at Central Governmen ns des consultant l ution ent des capacités de 600 act t Level s eurs de la commande publiq ue ZR-COREF-355997-CS-CQS / Recrutement du Cabinet Inte rnational chargé d'effectuer l Component 1. Strengthenin Sélection fondée 'étude de cadrage sur l'artisa g Public Resources Manage sur les qualificatio Open - Internationa IDA / 70200 A posteriori 200,000.00 0.00 Annulé 2023-04-25 2023-05-16 2023-06-29 2023-07-29 2023-09-02 2024-02-29 nat minier, Filière Diamant a ment at Central Governmen ns des consultant l u Kasaï Oriental et Kasaï aup t Level s rès des régies provinciales (E TDs et Direction des recettes provinciales) ZR-COREF-356053-CS-CQS / Recrutement d'un Cabinet In Component 1. Strengthenin Sélection fondée dépendant chargé d'élaborer g Public Resources Manage sur les qualificatio Open - Internationa le Rapport sur l'artisanat min IDA / 70200 A posteriori 130,000.00 0.00 Annulé 2023-04-25 2023-05-16 2023-06-29 2023-07-29 2023-09-02 2024-02-29 ment at Central Governmen ns des consultant l ier, Filière Diamant au Kasaï t Level s Oriental et Kasaï auprès des régies provinciales (ETD et D irection des recettes provinci ales). ZR-COREF-396994-CS-CQS / Recrutement d'une Agence d Sélection fondée e communication pour la pro Component 3. Project and C sur les qualificatio En cours d'exécut duction d'un magazine radiot IDA / 70200 hange Management, and E A posteriori Open - National 30,000.00 0.00 2023-12-15 2024-01-10 2024-01-05 2024-02-22 2024-02-18 2024-03-19 2024-04-23 2024-10-20 ns des consultant ion élévisé sur les réformes des f mergency Response s inances publiques, avec la p articipation des parties pren antes ZR-COREF-400211-CS-CQS / Recrutement d'un cabinet int Component 1. Strengthenin Sélection fondée ernational pour évaluer les b g Public Resources Manage sur les qualificatio esoins en renforcement de c IDA / 70200 A posteriori Limited 180,000.00 0.00 Annulé 2024-02-01 2024-01-10 2024-02-15 2024-03-16 2024-04-20 2024-10-17 ment at Central Governmen ns des consultant apacités des services interve t Level s nant dans la gestion des rev enus miniers et autres partie s prenantes ZR-COREF-411780-CS-QCBS / Recrutement d’un consulta Component 1. Strengthenin nt international firme pour la Sélection fondée g Public Resources Manage Open - Internationa En cours d'exécut réalisation de l’étude sur le p IDA / 70200 A posteriori sur la qualité et le 300,000.00 0.00 2024-04-14 2024-03-11 2024-05-05 2024-03-25 2024-06-18 2024-07-16 2024-08-15 2024-09-19 2024-10-24 2025-10-24 ment at Central Governmen l ion otentiel fiscal du secteur min coût t Level ier de la République Démocr atique du Congo, y compris l’ analyse et l’audit du régime f iscal ZR-COREF-410592-CS-CQS / Recrutement du Consultant c Component 1. Strengthenin Sélection fondée abinet chargé de mener l'étu g Public Resources Manage sur les qualificatio Open - Internationa En cours d'exécut IDA / 70200 A posteriori 300,000.00 0.00 2024-04-08 2024-03-06 2024-04-29 2024-03-25 2024-06-12 2024-07-12 2024-08-16 2025-02-12 de d'évaluation du niveau de ment at Central Governmen ns des consultant l ion réalisation du FOMIN par rap t Level s port aux recettes calculées p ar les Divisions des Mines ZR-COREF-410761-CS-CQS / Recrutement d'un consultant Component 1. Strengthenin Sélection fondée cabinet pour l'élaboration d'u g Public Resources Manage sur les qualificatio Open - Internationa En cours d'exécut n plan de formation des acte IDA / 70200 A posteriori 350,000.00 0.00 2024-04-08 2024-03-04 2024-04-29 2024-03-25 2024-06-12 2024-07-12 2024-08-16 2025-02-12 ment at Central Governmen ns des consultant l ion urs du secteur du portefeuill t Level s e (CSP, COPIREP, Secrétariat Géneral et managers des ent reprises publiques ciblées pa r le projet ZR-COREF-344755-CS-QCBS / Recrutement d'un consulta Component 1. Strengthenin nt cabinet pour l'élaboration Sélection fondée g Public Resources Manage Open - Internationa d'un plan de renforcement d IDA / 70200 A posteriori sur la qualité et le 250,000.00 0.00 Annulé 2023-04-13 2024-02-12 2023-05-04 2023-06-17 2023-07-15 2023-08-14 2023-09-18 2023-10-23 2024-10-22 ment at Central Governmen l es capacités du CSP, COPIRE coût t Level P, du Secrétariat Général et des managers des entreprise s publiques ciblées par le pro jet ZR-COREF-411797-CS-CQS / Recrutement d'un cabinet int Component 1. Strengthenin Sélection fondée ernational pour évaluer les b g Public Resources Manage sur les qualificatio Open - Internationa En cours d'exécut esoins en renforcement de c IDA / 70200 A posteriori 300,000.00 0.00 2024-04-14 2024-03-11 2024-04-14 2024-03-25 2024-04-14 2024-04-14 2024-04-14 2024-04-14 ment at Central Governmen ns des consultant l ion apacités des services interve t Level s nant dans la gestion des rev enus miniers et autres partie s prenantes ZR-COREF-414212-CS-CQS / Component 2. Supporting Sélection fondée Recrutement d'un consultant Resource Management at th sur les qualificatio En attente d'exéc cabinet pour mener une étud IDA / 70200 A posteriori Open - National 300,000.00 0.00 2024-04-07 2024-04-28 2024-06-11 2024-07-11 2024-08-15 2025-02-11 e Provincial Government Lev ns des consultant ution e sur le potentiel fiscal en fa el s veur de quatre provinces EN CORE ZR-COREF-414234-CS-CQS / Component 1. Strengthenin Sélection fondée Recrutement d'un Consultant g Public Resources Manage sur les qualificatio Open - Internationa En cours d'exécut cabinet chargé d'élaborer le IDA / 70200 A posteriori 300,000.00 0.00 2024-04-21 2024-03-25 2024-05-12 2024-06-25 2024-07-25 2024-08-29 2025-02-25 ment at Central Governmen ns des consultant l ion Rapport ITIE-RDC sur l'EMAP t Level s E, Filière Diamant, Exercice 2 023 ZR-COREF-419326-CS-QCBS Component 1. Strengthenin / Recrutement d'un cabinet i Sélection fondée g Public Resources Manage Open - Internationa En cours d'exame ndépendant chargé de mene IDA / 70200 A posteriori sur la qualité et le 300,000.00 0.00 2024-05-05 2024-04-10 2024-05-26 2024-07-09 2024-08-06 2024-09-05 2024-10-10 2024-11-14 2025-11-14 ment at Central Governmen l n r l'étude d'évaluation des rés coût t Level erves escomptées du Projet SICOMINES ZR-COREF-419336-CS-QCBS / Recrutement d'un consulta nt cabinet pour la conception Component 3. Project and C Sélection fondée Open - Internationa En cours d'exame et l'implémentation d'un logi IDA / 70200 hange Management, and E A posteriori sur la qualité et le 100,000.00 0.00 2024-05-05 2024-04-10 2024-05-26 2024-07-09 2024-08-06 2024-09-05 2024-10-10 2024-11-14 2025-11-14 l n ciel de gestion du projet et d mergency Response coût es composantes de suivi et é valuation du Projet ENCORE, y compris les CBP ZR-COREF-410748-CS-CQS / Recrutement d’une firme po ur l'assistance en maître d'o Sélection fondée uvrage du SIGeFiP avec le no Component 3. Project and C sur les qualificatio Limited - Internatio yau composé des modules b IDA / 70200 hange Management, and E A posteriori 500,000.00 0.00 Annulé 2024-03-01 2024-03-07 2024-03-15 2024-04-14 2024-05-19 2025-01-14 ns des consultant nal udgétaire, comptable et gest mergency Response s ion de la trésorerie (études p réalables et analyse des bes oins complémentaires en ren forcement de capacité et en équipe ZR-COREF-420801-CS-QCBS / Recrutement d’une firme p our l'assistance en maître d' Component 1. Strengthenin ouvrage du SIGeFiP avec le n Sélection fondée g Public Resources Manage Open - Internationa En cours d'exame oyau composé des modules IDA / 70200 A posteriori sur la qualité et le 600,000.00 0.00 2024-04-05 2024-04-17 2024-04-26 2024-06-09 2024-07-07 2024-08-06 2024-09-10 2024-10-15 2025-10-15 ment at Central Governmen l n budgétaire, comptable et ge coût t Level stion de la trésorerie (études préalables et analyse des be soins complémentaires en re nforcement de capacité et e n équipe INDIVIDUAL CONSULTANTS Activity Reference No. / Invitation to Identifie Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amoun Draft Negotiated Con Description Component Review Type Method Process Status Terms of Reference d/Selected Consultan Signed Contract Contract Completion o. h unt (US$) t (US$) tract t Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 7 ZR-COREF-264859-CS-INDV / Sélection d'un Consultant in Component 3. Project and C dividuel pour la rédaction du IDA / 70200 hange Management, and E A posteriori Individuel Open 30,000.00 43,000.00 Signé 2021-12-15 2021-12-15 2022-01-13 2022-03-01 2022-01-20 2022-03-29 2022-02-01 2022-04-12 2022-04-28 2023-02-28 manuel de vérification des P mergency Response BCs et PBPs du Projet ENCOR E ZR-COREF-265030-CS-INDV / Sélection d'un consultant in Component 2. Supporting dividuel pour réaliser une ét Resource Management at th ude de faisabilité pour la mis IDA / 70200 A posteriori Individuel Open 50,000.00 0.00 Annulé 2021-12-20 2022-02-24 2022-01-22 2022-02-01 2022-02-14 2022-04-30 e Provincial Government Lev e en place des administratio el ns provinciales du trésor, de la comptabilité et du budget dans 4 provinces identifiées ZR-COREF-265038-CS-INDV / Sélection d'un Consultant in Component 3. Project and C dividuel chargé de finaliser l IDA / 70200 hange Management, and E A posteriori Individuel Open 25,000.00 22,035.00 Achevé 2021-11-25 2021-12-15 2021-12-28 2022-02-18 2022-01-07 2022-03-11 2022-01-19 2022-03-18 2022-04-30 2022-07-15 e Plan de mobilisation des pa mergency Response rties prenantes (PMPP) et les Procédures de gestion de ma in-d’œuvre (PGMO) ZR-COREF-265039-CS-INDV Component 3. Project and C / Sélection d'un Consultant in IDA / 70200 hange Management, and E A posteriori Individuel Open 25,000.00 24,893.00 Achevé 2021-12-20 2021-12-15 2022-01-15 2022-03-01 2022-01-29 2022-03-11 2022-02-09 2022-03-18 2022-04-30 2022-07-17 dividuel chargé de finaliser l mergency Response e Plan d'Action VBG - EAS/HS ZR-COREF-265078-CS-CDS / Sélection d'un Consultant Na Component 1. Strengthenin tional individuel en Administr Sélection de cons g Public Resources Manage ation Publique chargé d’appu / A posteriori ultants par entent Direct 14,000.00 0.00 Annulé 2021-12-07 2021-12-15 2021-12-30 2022-04-30 ment at Central Governmen yer la mise en œuvre du Syst e directe t Level ème Intégré de Gestion des Ressources Humaines et de l a Paie (SIGRH-Paie)/ Jean LE MA ZR-COREF-265088-CS-INDV / Sélection d'un consultant in Component 1. Strengthenin ternational pour 4 mois (CTP) g Public Resources Manage chargé d’accompagner l’équi IDA / 70200 A posteriori Individuel Limited 40,000.00 0.00 Signé 2021-12-20 2022-03-08 2021-12-25 2022-03-29 2022-01-15 2022-12-30 2022-02-01 2023-01-08 2022-04-02 ment at Central Governmen pe technique nationale dans t Level l'organisation de l'enquête et l'actualisation de la base d'é chantillonnage (ECVM) ZR-COREF-265089-CS-INDV / Sélection d'un consultant in Component 1. Strengthenin ternational expert en sondag g Public Resources Manage e pour 4 mois chargé d’acco IDA / 70200 A posteriori Individuel Limited 40,000.00 0.00 Annulé 2021-12-10 2022-03-08 2021-12-15 2021-12-29 2022-01-10 2022-04-30 ment at Central Governmen mpagner l’équipe technique t Level nationale dans l'organisation de l'enquête et l'actualisatio n de la base d'échantillonnag e ZR-COREF-265092-CS-INDV / Sélection d'un consultant in Component 1. Strengthenin ternational expert en CAPI p g Public Resources Manage our 2 mois chargé d’accomp IDA / 70200 A posteriori Individuel Limited 20,000.00 0.00 Signé 2021-12-15 2022-03-08 2021-12-20 2022-03-29 2022-01-03 2023-03-03 2022-01-15 2023-03-15 2022-04-30 ment at Central Governmen agner l’équipe technique nati t Level onale dans l'organisation de l 'enquête et l'actualisation de la base d'échantillonnage (E CVM) ZR-COREF-265093-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Coordonn IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 28,000.00 29,600.00 Achevé 2021-12-10 2021-12-23 2021-12-18 2021-12-24 2021-12-30 2021-12-29 2022-04-30 2022-04-29 ateur National du Projet (God mergency Response e directe efroid MISENGA) ZR-COREF-265097-CS-CDS / Recrutement d'un Spécialiste Component 3. Project and C Sélection de cons en charge de la réforme du s IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 18,000.00 19,200.00 Achevé 2021-12-10 2022-01-11 2021-12-18 2022-01-12 2021-12-30 2022-01-17 2022-04-30 2022-04-29 ystème des marchés publics mergency Response e directe (Jean Baptiste VEKO) ZR-COREF-265098-CS-CDS / Recrutement d'un Spécialiste Component 3. Project and C Sélection de cons en charge de la réforme du s IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 18,000.00 19,200.00 Achevé 2021-12-10 2022-01-10 2021-12-18 2022-01-10 2021-12-30 2022-01-15 2022-04-30 2022-04-29 ystème comptable et gestion mergency Response e directe de la trésorerie (Robert BAM BA) ZR-COREF-265100-CS-CDS / Recrutement d'un Spécialiste Component 3. Project and C Sélection de cons en charge de la réforme de l' / hange Management, and E A posteriori ultants par entent Direct 18,000.00 0.00 Annulé 2021-12-10 2021-12-18 2021-12-30 2022-04-30 administration fiscale et gest mergency Response e directe ion des revenus miniers (Jea n Pierre SAMOLIA) ZR-COREF-265101-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Spécialiste IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 18,000.00 19,200.00 Achevé 2021-12-10 2022-01-10 2021-12-18 2022-01-10 2021-12-30 2022-01-15 2022-04-30 2022-04-29 en charge du contrôle intern mergency Response e directe e et externe (ETIENNE MAFW ENI) ZR-COREF-265103-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Spécialiste IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 18,000.00 19,200.00 Achevé 2021-12-10 2022-01-11 2021-12-18 2022-01-12 2021-12-30 2022-01-17 2022-04-30 2022-04-29 en charge de la décentralisat mergency Response e directe ion financière (Moise ASSANI ) ZR-COREF-265104-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Responsa IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 17,200.00 18,400.00 Achevé 2021-12-10 2021-12-25 2021-12-18 2021-12-28 2021-12-30 2022-01-02 2022-04-30 2022-04-29 ble Administratif et Financier mergency Response e directe (EMILE ASELE) ZR-COREF-265105-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Spécialiste IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 17,200.00 18,400.00 Achevé 2021-12-10 2021-12-23 2021-12-18 2021-12-24 2021-12-30 2021-12-29 2022-04-30 2022-04-29 Sénior en Passation des Marc mergency Response e directe hés (Luc M. SUKADI) ZR-COREF-265106-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Spécialiste IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 17,200.00 18,400.00 Achevé 2021-12-10 2021-12-23 2021-12-18 2021-12-24 2021-12-30 2021-12-29 2022-04-30 2022-04-29 sénior en Suivi & Evaluation mergency Response e directe (Jules KWILU) ZR-COREF-265107-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un (e) Assista IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 11,400.00 12,400.00 Achevé 2021-12-10 2021-12-23 2021-12-18 2021-12-24 2021-12-30 2021-12-29 2022-04-30 2022-04-29 nt (e) principal (e) de coordin mergency Response e directe ation (Véronique MANYA) ZR-COREF-265110-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un (e) Assista IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 6,000.00 7,000.00 Achevé 2021-12-10 2021-12-23 2021-12-18 2021-12-24 2021-12-30 2021-12-29 2022-04-30 2022-04-29 nt (e) en Passation des marc mergency Response e directe hés (Gisele MUAHUKA) ZR-COREF-265111-CS-INDV Component 3. Project and C / Recrutement d'un (e) Réce IDA / 70200 hange Management, and E A posteriori Individuel Limited 4,000.00 1,000.00 Achevé 2021-12-07 2021-12-15 2021-12-21 2021-12-28 2021-12-24 2021-12-29 2021-12-30 2022-01-05 2022-04-30 2022-04-29 ptionniste mergency Response ZR-COREF-265113-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Chauffeur IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 3,200.00 4,000.00 Achevé 2021-12-10 2021-12-23 2021-12-18 2021-12-24 2021-12-30 2021-12-29 2022-04-30 2022-04-29 (Jean BELO MUYUMBA) mergency Response e directe ZR-COREF-265253-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Coordonat IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 28,000.00 28,000.00 Achevé 2021-12-10 2022-01-19 2021-12-18 2022-01-21 2021-12-30 2022-01-26 2022-04-30 2022-05-07 eur de la Cellule de Suivi des mergency Response e directe Projets et Programmes CSPP (Honoré TSHIYOYO) ZR-COREF-265255-CS-CDS / Recrutement d'un Coordonn Component 3. Project and C Sélection de cons ateur Adjoint de la Cellule de IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 20,000.00 20,000.00 Achevé 2021-12-10 2022-01-19 2021-12-18 2022-01-21 2021-12-30 2022-01-26 2022-04-30 2022-05-07 Suivi des Projets et Program mergency Response e directe mes CSPP ( Clément MBIKAYI ) ZR-COREF-265269-CS-CDS / Recrutement d'un Chargé de Component 3. Project and C Sélection de cons s Projets à la Section Appui O IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 12,000.00 12,000.00 Achevé 2021-12-10 2022-01-19 2021-12-18 2022-01-21 2021-12-30 2022-01-26 2022-04-30 2022-05-07 pératoire '1) de la Cellule de mergency Response e directe Suivi des Projets et Program mes CSPP ( Audry KAZEMBO LA) ZR-COREF-265272-CS-CDS / Recrutement d'un Chargé de Component 3. Project and C Sélection de cons s Projets à la Section Moyens IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 12,000.00 12,000.00 Achevé 2021-12-10 2022-01-19 2021-12-18 2022-01-21 2021-12-30 2022-01-26 2022-04-30 2022-05-07 Généraux de la Cellule de Su mergency Response e directe ivi des Projets et Programme s CSPP (GRATIAS KAYIBABU KABUYA) Page 8 ZR-COREF-265273-CS-CDS / Recrutement d'un Chargé de Component 3. Project and C Sélection de cons s Projets à la Section Fiduciai IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 12,000.00 12,000.00 Achevé 2021-12-10 2022-01-19 2021-12-18 2022-02-19 2021-12-30 2022-01-26 2022-04-30 2022-05-07 re de la Cellule de Suivi des mergency Response e directe Projets et Programmes CSPP ( Diamant EBENE) ZR-COREF-265276-CS-CDS / Recrutement d'un Chargé de Component 3. Project and C Sélection de cons s Projets à la Section Fiduciai IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 12,000.00 12,000.00 Achevé 2021-12-10 2022-01-19 2021-12-18 2022-01-21 2021-12-30 2022-01-26 2022-04-30 2022-05-07 re de la Cellule des Projets et mergency Response e directe Programmes CSPP (Lourlaine MUANZA) ZR-COREF-265277-CS-CDS / Recrutement d'un Chargé de Component 3. Project and C Sélection de cons s Projets à la Section Appui O IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 12,000.00 12,000.00 Achevé 2021-12-10 2022-01-19 2021-12-18 2022-01-21 2021-12-30 2022-01-26 2022-04-30 2022-05-07 pératoire de la Cellule de Sui mergency Response e directe vi des Projets et Programmes CSPP ( Samuel KAULU) ZR-COREF-265278-CS-CDS / Recrutement d'un Chargé de Component 3. Project and C Sélection de cons s Projets à la Section Fiduciai IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 12,000.00 12,000.00 Achevé 2021-12-10 2022-01-19 2021-12-18 2022-01-21 2021-12-30 2022-01-26 2022-04-30 2022-05-07 re de la Cellule de Suivi des mergency Response e directe Projets et Programmes CSPP ( Eddy MBUNGU) ZR-COREF-265419-CS-CDS / Component 1. Strengthenin Sélection d'un Consultant Ind Sélection de cons g Public Resources Manage ividuel pour appuyer la 2ème IDA / 70200 A posteriori ultants par entent Direct 16,000.00 37,050.00 Signé 2021-12-15 2022-04-29 2021-12-25 2022-05-20 2022-01-05 2022-06-03 2022-04-30 ment at Central Governmen phase de la mise en place de e directe t Level SIGMAP (20 nouvelles cellule s)/ Pierre TSHIYOMBO ZR-COREF-265010-CS-INDV Component 1. Strengthenin / Sélection d'un consultant in g Public Resources Manage dividuel pour la mise en plac / A posteriori Individuel Limited 50,000.00 0.00 Annulé 2021-12-24 2021-12-27 2022-01-10 2022-01-30 2022-04-30 ment at Central Governmen e d'un système de gestion b t Level udgétaire en Provinces ZR-COREF-265027-CS-CDS / Sélection d'un consultant ind Component 2. Supporting Sélection de cons ividuel chargé d'appuyer l'él Resource Management at th IDA / 70200 A posteriori ultants par entent Direct 70,000.00 46,395.00 Signé 2022-01-03 2022-02-25 2022-01-11 2022-03-18 2022-01-29 2022-04-19 2022-04-29 2022-12-30 aboration des textes fixant le e Provincial Government Lev e directe s modalités de répartition de el s recettes à caractère nation al (Michael WINTER) ZR-COREF-267867-CS-CDS / Consultant pour l'appui à la p Component 1. Strengthenin Sélection de cons réparation de l'Enquête sur l g Public Resources Manage IDA / 70200 A posteriori ultants par entent Direct 450,000.00 0.00 Signé 2021-12-27 2022-12-22 2022-01-06 2022-12-24 2022-01-19 2023-01-06 2022-04-30 es Conditions de Vie des Mén ment at Central Governmen e directe ages (ECVM): Enquête sur le t Level s Unités non conventionnelle s (NSU) avec PNUD Component 3. Project and C ZR-COREF-270844-CS-INDV IDA / V4000 hange Management, and E A posteriori Individuel Limited 6,000.00 7,000.00 Achevé 2021-12-27 2021-12-31 2022-01-01 2022-01-05 2022-01-02 2022-01-07 2022-01-08 2022-01-27 2022-04-30 2022-05-09 / Recrutement d'un Trésorier mergency Response ZR-COREF-265109-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un (e) Trésori / hange Management, and E A posteriori ultants par entent Direct 6,000.00 0.00 Annulé 2021-12-10 2021-12-18 2021-12-30 2022-04-30 er (e) ( Sylvie NGEVESISE) mergency Response e directe ZR-COREF-265108-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Comptabl IDA / V4000 hange Management, and E A posteriori ultants par entent Direct 10,000.00 11,000.00 Achevé 2021-12-30 2021-12-31 2022-01-03 2022-01-04 2022-01-08 2022-01-09 2022-04-30 2022-04-29 e (Sylvie NGEVESISE) mergency Response e directe ZR-COREF-280723-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Spécialiste IDA / V4000 hange Management, and E A posteriori ultants par entent Direct 18,000.00 9,600.00 Achevé 2022-02-23 2022-02-28 2022-02-27 2022-03-01 2022-03-02 2022-03-17 2022-04-30 2022-05-09 en charge du suivi des donn mergency Response e directe ées statistiques sur la pauvre té (SASSE KEMBE) ZR-COREF-296056-CS-CDS / Component 1. Strengthenin Sélection de cons Sélection d'un consultant int g Public Resources Manage IDA / V4000 A posteriori ultants par entent Direct 50,000.00 0.00 Signé 2022-06-10 2022-06-08 2022-06-20 2022-06-18 2022-06-28 2022-10-18 2022-09-26 ernational pour la finalisation ment at Central Governmen e directe du cahier des charges et du t Level DAO du SiGeFiP ZR-COREF-264872-CS-INDV / Sélection d'un consultant p Component 1. Strengthenin our l'évaluation de la répartit g Public Resources Manage / A posteriori Individuel Limited 30,000.00 0.00 Annulé 2022-01-10 2022-01-24 2022-01-31 2022-02-17 2022-04-18 ion effective (Etude Benefit S ment at Central Governmen haring Assessment ou BSA) d t Level es recettes minières au nive au local (0.3% aux ETDs) ZR-COREF-265068-CS-CDS / Sélection d'un Consultant Ex pert en informatique et systè Component 1. Strengthenin Sélection de cons mes d’information chargé d’ g Public Resources Manage / A posteriori ultants par entent Direct 14,000.00 0.00 Annulé 2021-12-07 2021-12-15 2021-12-30 2022-04-30 appuyer la mise en œuvre d ment at Central Governmen e directe u Système Intégré de Gestio t Level n des Ressources Humaines et de la Paie (SIGRH-Paie)! PI ERRE TSHIYOMBO ZR-COREF-265080-CS-CDS / Component 1. Strengthenin Sélection d'un Consultant int Sélection de cons g Public Resources Manage ernational chargé de l' appui IDA / V4000 A posteriori ultants par entent Direct 100,000.00 63,625.00 Signé 2022-05-30 2022-05-31 2022-06-07 2022-06-13 2022-06-22 2022-07-20 2022-10-21 2023-01-11 ment at Central Governmen a la mise en œuvre du SIGRH e directe t Level -Paie/ GERARD VERGER ZR-COREF-265082-CS-CDS / Sélection d'un Consultant ind Component 1. Strengthenin ividuel chargé de la concepti Sélection de cons g Public Resources Manage on et la mise en œuvre d’un / A posteriori ultants par entent Direct 45,000.00 0.00 Annulé 2021-12-20 2021-12-28 2022-01-12 2022-04-30 ment at Central Governmen e plateforme web pour la mis e directe t Level e à jour du fichier de référen ce des agents de l’Administr ation publique (FRAP 2)/BOB BOSEKO ZR-COREF-265412-CS-INDV / Sélection d'un Consultant In Component 3. Project and C dividuel pour le développem / hange Management, and E A posteriori Individuel Limited 50,000.00 0.00 Annulé 2022-01-07 2022-02-16 2022-01-21 2022-01-31 2022-02-17 2022-04-18 ent , le paramétrage et la mi mergency Response se en service du logiciel de s tockage et analyse des donn ées du Suivi-Evaluation ZR-COREF-265411-CS-INDV / Sélection d'un Consultant In Component 3. Project and C dividuel pour le développem IDA / 70200 hange Management, and E A posteriori Individuel Limited 30,000.00 0.00 Annulé 2021-12-20 2022-02-23 2022-01-03 2022-01-13 2022-01-30 2022-04-30 ent, le paramétrage et la mis mergency Response e en service du logiciel de ge stion de projet (technique et mise en œuvre des activités) ZR-COREF-265095-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Spécialiste IDA / 70200 hange Management, and E A posteriori ultants par entent Direct 18,000.00 0.00 Annulé 2021-12-10 2022-01-10 2021-12-18 2021-12-30 2022-04-30 en charge du suivi des donn mergency Response e directe ées statistiques sur la pauvre té (SASSE KEMBE) ZR-COREF-296648-CS-INDV Component 3. Project and C / Recrutement du Coordonna IDA / 70200 hange Management, and E A posteriori Individuel Limited 42,000.00 0.00 Signé 2022-06-10 2022-06-02 2022-06-24 2022-06-24 2022-07-08 2022-08-19 2022-07-21 2022-08-26 2023-07-21 teur Provincial de la province mergency Response du Kasaï Central ZR-COREF-296654-CS-INDV Component 3. Project and C / Recrutement d'un Coordon IDA / 70200 hange Management, and E A posteriori Individuel Limited 42,000.00 38,400.00 Signé 2022-06-10 2022-06-02 2022-06-24 2022-06-24 2022-07-08 2022-07-04 2022-07-21 2022-08-23 2023-07-21 nateur Provincial pour la pro mergency Response vince du Kasaï Oriental ZR-COREF-296655-CS-INDV Component 3. Project and C / Recrutement d'un Coordon IDA / 70200 hange Management, and E A posteriori Individuel Limited 42,000.00 0.00 Signé 2022-06-10 2022-06-02 2022-06-24 2022-06-24 2022-07-08 2022-08-19 2022-07-21 2022-08-26 2023-07-21 nateur provincial pour la pro mergency Response vince de Lomami ZR-COREF-296656-CS-INDV Component 3. Project and C / Recrutement d'un Coordon IDA / 70200 hange Management, and E A posteriori Individuel Limited 42,000.00 38,400.00 Signé 2022-06-10 2022-06-02 2022-06-24 2022-06-24 2022-07-08 2022-07-15 2022-07-21 2022-08-23 2023-07-21 nateur provincial pour la pro mergency Response vince du Kasaï ZR-COREF-296657-CS-INDV Component 3. Project and C / Recrutement d'un Assistant IDA / 70200 hange Management, and E A posteriori Individuel Limited 24,000.00 0.00 Signé 2022-06-15 2022-06-02 2022-06-29 2022-06-24 2022-07-13 2022-08-20 2022-07-26 2022-08-27 2023-07-26 Provincial chargé de l'Admini mergency Response stration et Finances de la Pro vince du Kasaï Central ZR-COREF-296661-CS-INDV / Recrutement de l'Assistant Component 3. Project and C Provincial Chargé de l'Admini IDA / 70200 hange Management, and E A posteriori Individuel Limited 24,000.00 0.00 Signé 2022-06-15 2022-06-02 2022-06-29 2022-06-24 2022-07-13 2022-08-20 2022-07-26 2022-08-27 2023-07-26 stration et Finances de la pro mergency Response vince du Kasaï Oriental Page 9 ZR-COREF-296662-CS-INDV Component 3. Project and C / Recrutement de l'Assistant IDA / 70200 hange Management, and E A posteriori Individuel Limited 24,000.00 0.00 Signé 2022-06-15 2022-06-02 2022-06-29 2022-06-24 2022-07-13 2022-08-20 2022-07-26 2022-08-27 2023-07-26 Provincial chargé de l'Admini mergency Response stration et Finances de la pro vince de Lomami ZR-COREF-296665-CS-INDV Component 3. Project and C / Recrutement de l'Assistant IDA / 70200 hange Management, and E A posteriori Individuel Limited 24,000.00 0.00 Signé 2022-06-15 2022-06-08 2022-06-29 2022-06-24 2022-07-13 2022-08-20 2022-07-26 2022-08-27 2023-07-26 Provincial chargé de l'Admini mergency Response stration et Finances de la pro vince du Kasaï ZR-COREF-298958-CS-INDV Component 3. Project and C / Sélection d'un Consultant S IDA / 70200 hange Management, and E A posteriori Individuel Limited 51,600.00 55,200.00 Signé 2022-06-15 2022-06-08 2022-06-20 2022-06-23 2022-07-04 2022-07-27 2022-07-25 2022-08-10 2023-07-20 pécialiste en Passation des mergency Response marchés du Projet ENCORE ZR-COREF-305471-CS-INDV Component 3. Project and C / Recrutement d'Un Deuxièm IDA / 70200 hange Management, and E A posteriori Individuel Limited 54,180.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-09-15 2022-08-27 2023-04-04 2022-09-13 2023-04-14 2023-09-13 e Spécialiste en SUivi Evalua mergency Response tion du Projet ENCORE ZR-COREF-305481-CS-INDV Component 3. Project and C / Recrutement d'un (e) Charg IDA / 70200 hange Management, and E A posteriori Individuel Limited 31,500.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-09-13 2022-09-03 2022-09-29 2022-09-24 2022-10-06 2023-09-24 é (e) de Communication du P mergency Response rojet ENCORE ZR-COREF-305484-CS-INDV Component 3. Project and C / Recrutement d'un (e) Tréso IDA / 70200 hange Management, and E A posteriori Individuel Limited 18,900.00 0.00 Signé 2022-08-10 2022-08-17 2022-08-17 2022-09-13 2022-08-31 2022-09-23 2022-09-26 2022-09-30 2022-11-01 rier (e) du Projet ENCORE mergency Response ZR-COREF-305485-CS-INDV Component 3. Project and C / Recrutement d'un (e) Caissi IDA / 70200 hange Management, and E A posteriori Individuel Limited 15,000.00 0.00 Signé 2022-08-10 2022-08-17 2022-08-17 2022-09-23 2022-08-31 2022-09-29 2022-09-26 2022-10-06 2023-09-26 er (e) du Projet ENCORE mergency Response ZR-COREF-305486-CS-INDV Component 3. Project and C / Recrutement d'un Comptab IDA / 70200 hange Management, and E A posteriori Individuel Limited 31,500.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-09-14 2022-09-10 2022-09-29 2022-10-15 2022-10-06 2023-10-15 le Pour le Projet ENCORE mergency Response ZR-COREF-305499-CS-INDV Component 3. Project and C / Recrutement d'un Chauffeu IDA / 70200 hange Management, and E A posteriori Individuel Limited 12,600.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-09-13 2022-08-27 2022-09-23 2022-09-15 2022-09-30 2023-09-15 r coursier de la Coordination mergency Response du Projet ENCORE ZR-COREF-305502-CS-INDV Component 3. Project and C / Recrutement d'un Deuxièm IDA / 70200 hange Management, and E A posteriori Individuel Limited 10,800.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-09-13 2022-08-27 2022-09-23 2022-09-15 2022-09-30 2023-09-15 e Chauffeur Coursier de la C mergency Response oordination du Projet ENCOR E ZR-COREF-305512-CS-INDV Component 3. Project and C / Recrutement d'un (e) Réce IDA / 70200 hange Management, and E A posteriori Individuel Limited 12,600.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-29 2022-09-13 2022-09-01 2022-09-23 2022-09-07 2022-09-30 2023-09-07 ptionniste de la Coordination mergency Response Nationale du Projet ENCORE ZR-COREF-305514-CS-INDV Component 3. Project and C / Recrutement d'un (e) deuxi IDA / 70200 hange Management, and E A posteriori Individuel Limited 12,600.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-29 2022-09-13 2022-09-01 2022-09-23 2022-09-07 2022-09-30 2023-09-07 ème Réceptionniste de la Co mergency Response ordination Nationale du proje t ENCORE ZR-COREF-305517-CS-INDV Component 3. Project and C / Recrutement d'un (e) Spéci En cours d'exécut IDA / 70200 hange Management, and E A posteriori Individuel Limited 56,700.00 0.00 2022-08-15 2023-04-12 2022-08-20 2022-09-03 2022-09-24 2023-09-24 aliste chargé des systèmes d ion mergency Response 'information du Projet ENCOR E ZR-COREF-305522-CS-INDV / Recrutement d'un (e) Spéci Component 3. Project and C aliste en charge de la réform IDA / 70200 hange Management, and E A posteriori Individuel Limited 56,700.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-09-23 2022-09-03 2022-09-29 2022-09-24 2022-10-06 2023-09-24 e de l'Administration fiscale mergency Response et gestion des revenus minie rs ZR-COREF-305531-CS-INDV / Recrutement d'un (e) Spéci Component 3. Project and C aliste en charge de la surveill IDA / 70200 hange Management, and E A posteriori Individuel Limited 56,700.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-08-22 2022-09-10 2022-09-29 2022-10-01 2022-10-06 2023-10-01 ance des risques budgétaires mergency Response liés à la gestion des Entrepris es publiques ZR-COREF-305540-CS-INDV Component 3. Project and C / Recrutement d'un Spécialis IDA / 70200 hange Management, and E A posteriori Individuel Limited 54,180.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-09-15 2022-09-03 2022-11-22 2022-09-24 2022-12-25 2022-10-30 te en Charge des questions d mergency Response es Violences basées sur le ge nre ZR-COREF-305547-CS-INDV Component 3. Project and C / Recrutement d'un (e) Spéci IDA / 70200 hange Management, and E A posteriori Individuel Limited 54,180.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-09-15 2022-09-03 2022-11-22 2022-09-24 2022-12-07 2023-09-24 aliste en sauvegarde environ mergency Response nementale et sociale du proj et ENCORE ZR-COREF-305557-CS-INDV Component 3. Project and C En cours d'exécut / Recrutement d'un Assistant IDA / 70200 hange Management, and E A posteriori Individuel Limited 18,900.00 0.00 2022-08-15 2023-07-14 2022-08-20 2022-09-03 2022-09-24 2023-09-24 ion IT mergency Response ZR-COREF-305561-CS-INDV Component 3. Project and C / Recrutement d'un (e) Assist IDA / 70200 hange Management, and E A posteriori Individuel Limited 25,200.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-08-22 2022-09-03 2022-08-29 2022-09-24 2022-09-06 2023-09-24 ant (e) en décentralisation fi mergency Response nancière et Budget Participat if ZR-COREF-305564-CS-INDV / Recrutement d'un Spécialis Component 3. Project and C te en charge de la gestion du IDA / 70200 hange Management, and E A posteriori Individuel Limited 56,700.00 0.00 Signé 2022-08-15 2022-08-17 2022-08-20 2022-08-26 2022-09-03 2022-08-30 2022-09-24 2022-09-06 2023-09-24 changement et du Budget Pa mergency Response rticipatif du projet ENCORE ZR-COREF-305496-CS-CDS / Component 3. Project and C Sélection de cons Renouvellement contrat du C IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 9,600.00 12,000.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 hauffeur de la Coordination mergency Response e directe Nationale du Projet ENCORE - BELO MUYUMBA ZR-COREF-305107-CS-CDS / Component 3. Project and C Sélection de cons Renouvellement du contrat d IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 54,000.00 57,600.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 u Spécialiste en charge du co mergency Response e directe ntrôle interne et externe - Eti enne Mafweni ZR-COREF-305468-CS-CDS / Component 3. Project and C Sélection de cons Renouvellement du Contrat IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 51,600.00 55,200.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 du Responsable Administratif mergency Response e directe et Financier (RAF) du Projet E NCORE - Emile ASELE ZR-COREF-305470-CS-CDS / Component 3. Project and C Sélection de cons Renouvellement Contrat du IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 51,600.00 55,200.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 Spécialiste en Suivi Evaluatio mergency Response e directe n du Projet ENCORE - Jules K WILU ZR-COREF-305098-CS-CDS / Renouvellement du Contrat Component 3. Project and C Sélection de cons du Spécialiste en charge de l IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 54,000.00 57,600.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 a Réforme du système de la mergency Response e directe comptabilité et gestion de la trésorerie - Robert Bamba ZR-COREF-305478-CS-CDS / Component 3. Project and C Sélection de cons Renouvellement contrat de l' IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 34,200.00 37,800.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 Assistante Principale du Proj mergency Response e directe et ENCORE (APP) - Véronique MANYA ZR-COREF-305112-CS-CDS / Renouvellement du contrat d Component 3. Project and C Sélection de cons u Spécialiste en charge du su IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 54,000.00 57,600.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 ivi des données statistiques s mergency Response e directe ur la Pauvreté du Projet ENC ORE - Sasse Kembe ZR-COREF-305110-CS-CDS / Renouvellement du Contrat Component 3. Project and C Sélection de cons du Spécialiste en charge de l IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 54,000.00 57,600.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 a réforme du système des m mergency Response e directe archés publics et gestion de l a dépense - Jean Baptiste VE KO ZR-COREF-305483-CS-CDS / Component 3. Project and C Sélection de cons Recrutement Chargée de Pas IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 36,000.00 39,600.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 sation des Marchés du Projet mergency Response e directe ENCORE (Gisèle MUAHUKA) Page 10 ZR-COREF-305090-CS-CDS / Component 3. Project and C Sélection de cons Renouvellement Contrat du IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 84,000.00 88,800.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 Coordonnateur National du P mergency Response e directe rojet ENCORE - Godefroid MI SENGA MILABYO ZR-COREF-305094-CS-CDS / Component 3. Project and C Sélection de cons Renouvellement du Contrat IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 54,000.00 57,600.00 Signé 2022-07-25 2022-08-19 2022-07-28 2022-08-19 2022-08-02 2022-08-23 2024-08-01 Spécialiste en charge de la D mergency Response e directe écentralisation financière - M oise ASSANI ZR-COREF-310943-CS-INDV / Selection d'un consultant in Component 1. Strengthenin ternational expert en sondag g Public Resources Manage e pour 4 mois chargé d'acco IDA / 70200 A posteriori Individuel Limited 40,000.00 0.00 Signé 2022-08-31 2022-08-19 2022-09-03 2022-08-24 2022-09-08 2022-11-28 2022-09-15 2022-12-09 2023-01-13 ment at Central Governmen mpagner l'équipe technique t Level national dans l'organisation de l'enquête et l'actualisatio n de la base d'échantilllonna ge ZR-COREF-344138-CS-INDV / Recrutement d'un Consulta nt National pour assurer la fo Component 1. Strengthenin rmation des agents des servi g Public Resources Manage En cours d'exécut ces d'assiette et de recouvre IDA / 70200 A posteriori Individuel Open - National 70,000.00 0.00 2023-03-18 2023-04-10 2023-04-27 2023-05-18 2023-06-22 2023-12-19 ment at Central Governmen ion ment (DGRAD et administrati t Level ons de mines) sur la maitrise de l'assiette de la redevance minière dans les 5 sites mini ers de la RDC : Kinshasa, H ZR-COREF-344146-CS-INDV / Recrutement d'un Consulta nt International pour assurer Component 1. Strengthenin la formation à Kinshasa sur l g Public Resources Manage Open - Internationa En cours d'exécut a chaîne de valeur de l'indus IDA / 70200 A posteriori Individuel 100,000.00 0.00 2023-03-15 2023-04-10 2023-04-24 2023-05-15 2023-06-19 2023-12-16 ment at Central Governmen l ion trie extractive minière, sur le t Level s spécificités comptable et l a Fiscalité du secteur des mi nes (DGI) des vérificateurs pr ovenant des 5 sites mi ZR-COREF-344209-CS-INDV Component 1. Strengthenin / Recrutement des deux (02) g Public Resources Manage En cours d'exécut consultants individuels pour IDA / 70200 A posteriori Individuel Open - National 60,000.00 0.00 2023-03-03 2023-10-02 2023-03-24 2023-04-07 2023-05-12 2023-11-08 ment at Central Governmen ion la mise à jour des guides d’él t Level aboration du PEB et du PTR e n lien avec le PPM ZR-COREF-344299-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En attente d'exéc IDA / 70200 A posteriori Individuel Open - National 30,000.00 0.00 2023-07-03 2023-08-12 2023-08-26 2023-09-30 2024-03-28 nt individuel pour la producti ment at Central Governmen ution on du guide de contrôle bud t Level gétaire ZR-COREF-344310-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En attente d'exéc nt individuel pour la producti IDA / 70200 A posteriori Individuel Open - National 30,000.00 0.00 2023-10-02 2023-11-20 2023-12-11 2024-01-15 2024-07-13 ment at Central Governmen ution on du projet de plan de renfo t Level rcement des capacités des c ontrôleurs budgétaires ZR-COREF-344314-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt international devant mene g Public Resources Manage Open - Internationa En attente d'exéc r une étude de faisabilité sur IDA / 70200 A posteriori Individuel 70,000.00 0.00 2023-03-20 2023-05-08 2023-05-29 2023-07-03 2023-12-30 ment at Central Governmen l ution la mise en place du Compte t Level Unique du Trésor et son arch itecture favorable au cadre i nstitutionnel de la RDC ZR-COREF-344350-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage Open - Internationa En cours d'exécut nt International chargé d'opti IDA / 70200 A posteriori Individuel 100,000.00 0.00 2023-03-22 2023-04-24 2023-05-10 2023-05-31 2023-07-05 2024-01-01 ment at Central Governmen l ion miser les macro-processus d t Level e gestion des ressources hu maines et de la paie ZR-COREF-344399-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt International pour les Etud g Public Resources Manage Open - Internationa En attente d'exéc IDA / 70200 A posteriori Individuel 60,000.00 0.00 2023-03-10 2023-04-28 2023-05-19 2023-06-23 2023-12-20 es de faisabilités relatives au ment at Central Governmen l ution réseau étendu en fibre optiq t Level ue et boucle radio local de l’ Administration Publique ZR-COREF-344421-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En attente d'exéc nt individuel pour accompag IDA / 70200 A posteriori Individuel Limited 40,000.00 0.00 2023-03-29 2023-04-03 2023-04-24 2023-05-29 2023-07-13 ment at Central Governmen ution ner le processus de sélection t Level de l'Assistance en maitrise d' ouvrage du SiGeFiP ZR-COREF-344445-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt international chargé de l'a g Public Resources Manage Open - Internationa En cours d'exécut ssistance technique à l'ARMP IDA / 70200 A posteriori Individuel 70,000.00 0.00 2023-04-03 2023-07-31 2023-05-22 2023-06-12 2023-07-17 2023-09-15 ment at Central Governmen l ion pour la révision du cadre juri t Level dique des marchés publics e n tenant compte de la démat érialisation du processus ZR-COREF-344466-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt international chargé de la g Public Resources Manage Open - Internationa En attente d'exéc IDA / 70200 A posteriori Individuel 80,000.00 0.00 2023-03-30 2023-04-20 2023-05-11 2023-06-15 2023-08-14 formation des auditeurs de l' ment at Central Governmen l ution ARMP en MP et PPP ainsi que t Level la redaction du manuel de pr ocedures des audits. ZR-COREF-344495-CS-INDV Component 1. Strengthenin En attente d'exéc / Recrutement d'un webmast IDA / 70200 g Public Resources Manage A posteriori Individuel Limited 50,000.00 0.00 2023-04-01 2023-04-06 2023-04-27 2023-06-01 2023-07-31 ution er pour l'audit du site web du ment at Central Governmen CSP t Level ZR-COREF-344499-CS-INDV Component 1. Strengthenin / Recrutement d'un web mas g Public Resources Manage En cours d'exécut ter pour développement du s IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 2023-03-17 2023-12-07 2023-05-05 2023-05-26 2023-06-30 2023-12-27 ment at Central Governmen ion ite web du Ministère du Porte t Level feuille conformément au pla n national de numérisation ZR-COREF-344503-CS-INDV / Recrutement d'un Web Mas Component 1. Strengthenin ter pour le développement d’ g Public Resources Manage En cours d'exécut un portail au niveau des entr IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 2023-03-14 2023-04-11 2023-04-23 2023-05-14 2023-06-18 2023-12-15 ment at Central Governmen ion eprises sur les informations à t Level collecter et à échanger avec possibilité d’interaction en li gne avec le CSP. ZR-COREF-344514-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt pour l’élaboration d’un ma g Public Resources Manage En cours d'exécut IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 2023-04-10 2023-05-20 2023-05-29 2023-06-19 2023-07-24 2023-10-22 nuel des procédures en mati ment at Central Governmen ion ère de contrôle et audit des t Level entreprises publiques et étab lissements publics ZR-COREF-344517-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En cours d'exécut IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 2023-04-17 2023-05-20 2023-06-05 2023-06-26 2023-07-31 2024-01-27 nt pour la production du proj ment at Central Governmen ion et de la stratégie du Portefeu t Level ille ZR-COREF-344749-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En attente d'exéc nt national pour la productio IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 2023-04-01 2023-05-20 2023-06-10 2023-07-15 2023-09-13 ment at Central Governmen ution n des contrats de concession t Level type des biens du domaine p ublic de l'Etat ZR-COREF-344774-CS-INDV / Recrutement des consultan ts nationaux pour mener l'an Component 2. Supporting alyse des états de suivi budg Resource Management at th En cours d'exécut étaires (ESB) trimestriels et s IDA / 70200 A posteriori Individuel Open - National 80,000.00 0.00 2023-05-08 2023-08-31 2023-06-26 2023-07-17 2023-08-21 2024-02-17 e Provincial Government Lev ion emestriels des secteurs pro el pauvres (Education, Santé, M ines, Agriculture et développ ement rural, Energie, Sécurit é, Infrastructures) et le ge ZR-COREF-344786-CS-INDV / Recrutement de consultant Component 1. Strengthenin s nationaux pour la formatio g Public Resources Manage En cours d'exécut IDA / 70200 A posteriori Individuel Open - National 70,000.00 0.00 2023-03-30 2023-04-10 2023-05-18 2023-06-08 2023-07-13 2024-01-09 n des services concernés à la ment at Central Governmen ion production et à la publication t Level des documents budgétaires- clés nationaux Page 11 ZR-COREF-344812-CS-INDV / Recrutement du consultant individuel chargé réaliser les Component 1. Strengthenin études, la production du DA g Public Resources Manage En attente d'exéc IDA / 70200 A posteriori Individuel Open - National 100,000.00 0.00 2023-03-27 2023-05-15 2023-06-05 2023-07-10 2024-01-06 O ainsi que le contrôle et sur ment at Central Governmen ution veillance des travaux de réh t Level abilitation du bâtiment deva nt abriter la chambre des co mptes déconcentrées de Kan anga ZR-COREF-344837-CS-INDV / Recrutement d'un consulta Component 2. Supporting nt international pour la réalis Resource Management at th Open - Internationa En cours d'exécut IDA / 70200 A posteriori Individuel 120,000.00 0.00 2023-03-20 2023-04-10 2023-05-08 2023-05-29 2023-07-03 2023-12-30 ation de l'évaluation de la p e Provincial Government Lev l ion erformance des administrati el ons fiscales provinciales suiv ant l'approche TADAT. ZR-COREF-344901-CS-INDV / Recrutement d'un consulta Component 2. Supporting nt ingénieur architecte pour f Resource Management at th En attente d'exéc aire l'état des lieux et le suivi IDA / 70200 A posteriori Individuel Open - National 150,000.00 0.00 2023-04-08 2023-05-27 2023-06-17 2023-07-22 2024-01-18 e Provincial Government Lev ution des bâtiments à réhabiliter d el ans les 4 provinces (du Kasaï Oriental, du Kasaï, du Kasaï Central et de Lomami) ZR-COREF-344912-CS-CDS / Déploiement multi-sites du lo Component 3. Project and C Sélection de cons Direct - Internation En attente d'exéc giciel de gestion financière d IDA / 70200 hange Management, and E A posteriori ultants par entent 40,000.00 0.00 2023-04-15 2023-04-25 2023-06-29 2023-12-26 al ution u projet ENCORE (auprès de mergency Response e directe TOMATE) et mise à niveau ZR-COREF-345018-CS-INDV Component 3. Project and C En cours d'exécut / Recrutement d'un auditeur IDA / 70200 hange Management, and E A posteriori Individuel Open - National 60,000.00 0.00 2023-03-10 2023-03-16 2023-04-19 2023-05-10 2023-06-14 2024-06-13 ion interne mergency Response ZR-COREF-345068-CS-INDV / Recrutement d'un consulta nt pour traduire un documen Component 3. Project and C En cours d'exécut t synthèse sur le projet en la IDA / 70200 hange Management, and E A posteriori Individuel Open - National 20,000.00 0.00 2023-04-14 2023-12-07 2023-06-02 2023-06-23 2023-07-28 2024-01-24 ion ngues locales (résumé du pr mergency Response ojet : son envergure, ses risq ues et effets environnement ales et sociale) ZR-COREF-345081-CS-INDV / Recrutement d'un consulta Component 3. Project and C nt individuel pour l'élaboratio En cours d'exécut IDA / 70200 hange Management, and E A posteriori Individuel Open - National 30,000.00 0.00 2023-03-21 2023-04-24 2023-05-09 2023-05-30 2023-07-04 2023-12-31 n de la stratégie de gestion d ion mergency Response u changement et la revue qu alité de la stratégie de comm unication ZR-COREF-345087-CS-INDV Component 3. Project and C / Recrutement des consultan En attente d'exéc IDA / 70200 hange Management, and E A posteriori Individuel Open - National 50,000.00 0.00 2023-04-07 2023-05-26 2023-06-16 2023-07-21 2024-01-17 ts ponctuels pour les évaluati ution mergency Response ons des offres et proposition s ZR-COREF-345088-CS-INDV Component 3. Project and C En cours d'exécut / Recrutement de deux comp IDA / 70200 hange Management, and E A posteriori Individuel Open - National 79,200.00 0.00 2023-03-28 2023-03-17 2023-05-16 2023-06-06 2023-07-11 2024-07-10 ion tables pour le projet ENCORE mergency Response ZR-COREF-345092-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En attente d'exéc IDA / 70200 A posteriori Individuel Open - National 100,000.00 0.00 2023-04-18 2023-06-06 2023-06-27 2023-08-01 2024-01-28 nt pour une assistance techn ment at Central Governmen ution ique dans la fiscalité minière t Level ZR-COREF-344362-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En attente d'exéc nt national pour l'élaboration IDA / 70200 A posteriori Individuel Open - National 100,000.00 0.00 2023-03-17 2023-05-05 2023-05-26 2023-06-30 2023-12-27 ment at Central Governmen ution du manuel de procédures de t Level gestion des ressources huma ines et la Paie ZR-COREF-344827-CS-CDS / Component 1. Strengthenin Sélection de cons Appui à l'Organisation de l’e IDA / 70200 g Public Resources Manage A priori ultants par entent Direct - National 9,607,330.00 0.00 Signé 2023-03-15 2023-04-28 2023-03-25 2023-05-18 2023-05-29 2023-03-30 2023-11-25 nquête ECVM proprement dit ment at Central Governmen e directe e avec le PNUD t Level ZR-COREF-344384-CS-INDV / Recrutement consultant ind ividuel pour élaborer le cahie Component 1. Strengthenin r des charges et le DAO pour g Public Resources Manage En attente d'exéc l'installation, la sécurisation IDA / 70200 A posteriori Individuel Limited 30,000.00 0.00 2023-03-13 2023-03-18 2023-04-08 2023-05-13 2023-11-09 ment at Central Governmen ution et la mise en marche du data t Level center de secours de la Direc tion de la Gestion des bases des données des RH à la fon ction publique (DBDR). ZR-COREF-344845-CS-INDV Component 2. Supporting / Recrutement d'un cabinet p Resource Management at th Open - Internationa our mener une étude sur le p IDA / 70200 A priori Individuel 600,000.00 0.00 Annulé 2023-03-31 2023-05-19 2023-06-09 2023-07-14 2024-01-10 e Provincial Government Lev l otentiel fiscal en faveur de q el uatre provinces ENCORE ZR-COREF-344484-CS-INDV Component 1. Strengthenin / Recrutement du consultant Sélection de cons g Public Resources Manage En attente d'exéc individuel Expert Pierre Tshiy IDA / 70200 A posteriori ultants par entent Direct - National 50,000.00 0.00 2023-03-24 2023-04-03 2023-06-07 2023-12-04 ment at Central Governmen ution ombo pour l'assistance techn e directe t Level ique dans la phase de produ ction du SIGMAP ZR-COREF-355174-CS-INDV Component 3. Project and C / Recrutement d'un(e) assist En cours d'exécut IDA / 70200 hange Management, and E A posteriori Individuel Limited 30,000.00 0.00 2023-05-01 2023-04-24 2023-05-06 2023-05-20 2023-06-10 2024-06-09 ant(e) en décentralisation fin ion mergency Response ancière et budget participatif ZR-COREF-355179-CS-INDV Component 3. Project and C / Recrutement d'un spécialist En attente d'exéc IDA / 70200 hange Management, and E A posteriori Individuel Limited 56,700.00 0.00 2023-05-01 2023-05-06 2023-05-27 2023-07-01 2023-12-28 e en charge de la reforme de ution mergency Response la fonction publique pour le P rojet ENCORE ZR-COREF-355180-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En cours d'exécut IDA / 70200 A posteriori Individuel Limited 56,700.00 0.00 2023-04-15 2023-05-23 2023-04-20 2023-05-11 2023-06-15 2023-12-12 nt national Expert en Mine p ment at Central Governmen ion our le projet ENCORE t Level ZR-COREF-355425-CS-INDV Component 3. Project and C / Recrutement d'un 2ème sp En cours d'exécut IDA / 70200 hange Management, and E A posteriori Individuel Limited 55,200.00 0.00 2023-04-15 2023-04-11 2023-04-20 2023-05-11 2023-06-15 2023-12-12 écialiste en Passation des Ma ion mergency Response rchés du Projet ENCORE ZR-COREF-345715-CS-INDV Component 1. Strengthenin En cours d'exécut / Assistance technique à l'AR IDA / 70200 g Public Resources Manage A posteriori Individuel Open - National 200,000.00 0.00 2023-05-10 2023-07-20 2023-06-28 2023-07-19 2023-08-23 2024-02-19 ion MP pour la mise en œuvre de ment at Central Governmen s réformes t Level ZR-COREF-345701-CS-INDV Component 3. Project and C / Recrutement d'un chargé d IDA / 70200 hange Management, and E A posteriori Individuel Open - National 40,000.00 0.00 Annulé 2023-04-29 2023-03-17 2023-05-20 2023-06-10 2023-07-15 2024-07-14 e Passation des Marchés mergency Response ZR-COREF-356313-CS-INDV Component 3. Project and C En attente d'exéc / Recrutement d'un expert fis IDA / 70200 hange Management, and E A posteriori Individuel Open - National 56,700.00 0.00 2023-04-12 2023-05-31 2023-06-21 2023-07-26 2024-01-22 ution caliste pour le projet ENCOR mergency Response E ZR-COREF-363418-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un consultant Direct - Internation En attente d'exéc IDA / 70200 hange Management, and E A posteriori ultants par entent 350,000.00 0.00 2023-05-27 2023-06-06 2023-08-10 2024-02-06 firme chargé de l'audit des d al ution mergency Response e directe épenses éligibles au progra mme (PDE) ZR-COREF-363431-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt Senior International pour l' g Public Resources Manage Open - Internationa En cours d'exécut élaboration de la stratégie d IDA / 70200 A posteriori Individuel 100,000.00 0.00 2023-05-29 2023-07-13 2023-07-17 2023-08-07 2023-09-11 2024-03-09 ment at Central Governmen l ion e renforcement des capacité t Level s, de formation et de professi onnalisation des acteurs nati onaux de la commande Publi que. ZR-COREF-371824-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un Coordonn En cours d'exécut IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 64,200.00 0.00 2023-08-30 2023-09-23 2023-09-09 2023-11-13 2024-05-11 ateur Adjoint ion mergency Response e directe Mme BULEMI NKULU Angelin e ZR-COREF-378709-CS-INDV Component 1. Strengthenin / Recrutement d’un consulta g Public Resources Manage En attente d'exéc nt national pour l’étude préal IDA / 70200 A posteriori Individuel Limited 100,000.00 0.00 2023-09-18 2023-09-23 2023-10-14 2023-11-18 2024-05-16 ment at Central Governmen ution able à la mise en place du sy t Level stème d’information compta ble Page 12 ZR-COREF-378711-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt international pour mener g Public Resources Manage En attente d'exéc IDA / 70200 A posteriori Individuel Limited 100,000.00 0.00 2023-09-21 2023-09-26 2023-10-17 2023-11-21 2024-05-19 une étude relative à la mise ment at Central Governmen ution en place d'une solution infor t Level matique nécessaire au foncti onnement du CUT ZR-COREF-379000-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt international expert en CA g Public Resources Manage En cours d'exécut PI pour 2 mois chargé d’acco IDA / 70200 A posteriori Individuel Limited 70,000.00 0.00 2023-10-02 2023-09-22 2023-10-07 2023-10-28 2023-12-02 2024-05-30 ment at Central Governmen ion mpagner l’équipe technique t Level nationale dans l'organisation de l'enquête et l'actualisatio n de la base d'échantillonnag e (ECVM) ZR-COREF-379010-CS-CDS / Component 1. Strengthenin Recrutement d'un consultant Sélection de cons g Public Resources Manage En cours d'exécut national pour la redynamisati IDA / 70200 A posteriori ultants par entent Direct - National 80,000.00 0.00 2023-09-20 2023-12-27 2023-09-30 2023-12-04 2024-06-01 ment at Central Governmen ion on du site web de la Cour de e directe t Level s comptes (Hervé MUNTENG A) ZR-COREF-344504-CS-INDV / Recrutement d'un consulta nt pour la production du proj Component 1. Strengthenin et de guide pour l'examen d g Public Resources Manage u rapport consolidé de la situ IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 Annulé 2023-04-05 2023-05-20 2023-05-15 2023-06-05 2023-07-10 2023-09-08 ment at Central Governmen ation financière des entrepris t Level es publiques à l'usage des m embres des services techniq ues des commission ECOFIN de l'Assemblée National et d u Sén ZR-COREF-360909-CS-CDS / Component 3. Project and C Sélection de cons Recrutement d'un consultant Direct - Internation IDA / 70200 hange Management, and E A posteriori ultants par entent 350,000.00 0.00 Annulé 2023-05-11 2023-05-12 2023-05-21 2023-07-25 2024-01-21 firme chargé de l'audit des d al mergency Response e directe épenses éligibles au progra mme (PDE) ZR-COREF-344206-CS-INDV / Recrutement d'un Consulta Component 1. Strengthenin nt National pour évaluer le ni g Public Resources Manage IDA / 70200 A posteriori Individuel Open - National 40,000.00 0.00 Annulé 2023-02-25 2023-04-10 2023-03-18 2023-04-08 2023-05-13 2023-11-09 veau d'exécution des réform ment at Central Governmen es engagées par les entrepri t Level ses Publiques du secteur ext ractif. ZR-COREF-305487-CS-INDV Component 3. Project and C / Recrutement d'un Deuxièm IDA / 70200 hange Management, and E A posteriori Individuel Limited 30,000.00 0.00 Annulé 2022-08-15 2022-08-19 2022-08-20 2022-11-03 2022-09-10 2022-11-18 2022-10-15 2023-10-15 e Comptable du Projet ENCO mergency Response RE ZR-COREF-344327-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt international et d'un cons g Public Resources Manage ultant national pour mener u IDA / 70200 A posteriori Individuel Limited 100,000.00 0.00 Annulé 2023-03-27 2023-04-01 2023-04-22 2023-05-27 2023-11-23 ment at Central Governmen ne étude relative à la mise e t Level n place d'une solution inform atique nécessaire au fonctio nnement du CUT ZR-COREF-387129-CS-CDS / Component 3. Project and C Sélection de cons En cours d'exécut Recrutement d'un (e) Assista IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 33,600.00 0.00 2023-10-12 2023-10-18 2023-10-22 2023-11-12 2024-11-11 ion nt (e) du Coordonnateur Nati mergency Response e directe onal ZR-COREF-387146-CS-CDS / Recrutement d'un Spécialiste Component 3. Project and C Sélection de cons En cours d'exécut en Charge de la reforme de l' IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 67,200.00 0.00 2023-10-12 2023-10-18 2023-10-22 2023-11-12 2024-05-10 ion Administration fiscale et gest mergency Response e directe ion des revenus miniers, TSH IKUB Judel ZR-COREF-387127-CS-CDS / Component 3. Project and C En cours d'exécut Recrutement d'un (e) chargé IDA / 70200 hange Management, and E A posteriori Individuel Open - National 54,000.00 0.00 2023-10-24 2023-10-24 2023-11-26 2023-12-17 2024-01-21 2024-07-19 ion (e) des opérations du Projet mergency Response ENCORE ZR-COREF-390499-CS-INDV Component 1. Strengthenin / Recrutement des trois (03) g Public Resources Manage En cours d'exécut consultants individuels pour l IDA / 70200 A posteriori Individuel Open - National 100,000.00 0.00 2023-10-30 2023-11-15 2023-11-20 2023-12-04 2024-01-08 2024-07-06 ment at Central Governmen ion a mise à jour des guides d’él t Level aboration du PEB et du PTR e n lien avec le PPM ZR-COREF-390502-CS-INDV Component 3. Project and C / Recrutement d'un (e) Assist En cours d'exécut IDA / 70200 hange Management, and E A posteriori Individuel Limited 33,600.00 0.00 2023-10-30 2023-11-30 2023-11-04 2023-11-25 2023-12-30 2024-06-27 ant (e) en Passation des Mar ion mergency Response chés du Projet ENCORE ZR-COREF-390507-CS-INDV Component 3. Project and C / Recrutement d’un (e) Spéci En cours d'exécut IDA / 70200 hange Management, and E A posteriori Individuel Open - National 67,200.00 0.00 2023-11-15 2023-12-04 2024-01-03 2024-01-24 2024-02-28 2024-08-26 aliste chargé des systèmes d ion mergency Response ’information du projet ENCO RE ZR-COREF-390500-CS-INDV Component 3. Project and C / Recrutement d'un (e) charg En cours d'exécut IDA / 70200 hange Management, and E A posteriori Individuel Open - National 39,600.00 0.00 2023-11-30 2024-01-24 2024-01-18 2024-02-08 2024-03-14 2024-09-10 é (e) de Passation des March ion mergency Response és du Projet ENCORE ZR-COREF-390510-CS-CQS / Component 1. Strengthenin Sélection de cons Recrutement d’un Cabinet In g Public Resources Manage Direct - Internation En cours d'exécut IDA / 70200 A posteriori ultants par entent 100,000.00 0.00 2023-12-04 2023-12-04 2023-12-14 2024-02-17 2024-08-15 dépendant pour élaborer le r ment at Central Governmen al ion e directe apport ITIE-RDC 2022 t Level ZR-COREF-409858-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage Open - Internationa En cours d'exécut IDA / 70200 A posteriori Individuel 100,000.00 0.00 2024-04-04 2024-03-04 2024-05-23 2024-06-13 2024-07-18 2025-01-14 nt international pour la prod ment at Central Governmen l ion uction de la stratégie sectori t Level elle du Portefeuille ZR-COREF-409942-CS-INDV Component 1. Strengthenin / Recrutement d’un consulta g Public Resources Manage En cours d'exécut nt national pour élaborer le IDA / 70200 A posteriori Individuel Open - National 100,000.00 0.00 2024-04-04 2024-03-11 2024-05-23 2024-06-13 2024-07-18 2025-01-14 ment at Central Governmen ion manuel des procédures de c t Level ollecte de la redevance mini ère pour la DGRAD ZR-COREF-409944-CS-INDV / Recrutement d'un consulta Component 3. Project and C Open - Internationa En attente d'exéc nt International chargé d'opti IDA / 70200 hange Management, and E A posteriori Individuel 100,000.00 0.00 2024-04-04 2024-05-23 2024-06-13 2024-07-18 2025-01-14 l ution miser les macro-processus d mergency Response e gestion des ressources hu maines et de la paie ZR-COREF-410254-CS-CDS / Recrutement d’un consultant Component 1. Strengthenin individuel international senio Sélection de cons g Public Resources Manage Direct - Internation En cours d'exécut r charge d’accompagner l’AR IDA / 70200 A posteriori ultants par entent 100,000.00 0.00 2024-02-19 2024-02-28 2024-02-29 2024-04-10 2024-05-04 2024-10-31 ment at Central Governmen al ion MP dans la mise en œuvre d e directe t Level u plan stratégique de la réfor me du système des marches publics de la RDC ZR-COREF-378877-CS-INDV / Recrutement d'un consulta nt individuel pour effectuer l Component 3. Project and C es études (cahier des charge IDA / 70200 hange Management, and E A posteriori Individuel Limited 5,000.00 0.00 Annulé 2023-09-25 2023-12-07 2023-09-30 2023-10-21 2023-11-25 2024-05-23 s) relatives à la réhabilitation mergency Response du bâtiment mis à dispositio n pour la coordination provin ciale du Kasaï ZR-COREF-344723-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 Annulé 2023-07-03 2023-12-07 2023-08-21 2023-09-11 2023-10-16 2023-12-15 nt pour la production des con ment at Central Governmen trats de performance type pa t Level r secteur d'activités ZR-COREF-410595-CS-INDV / Recrutement d'un consulta Component 1. Strengthenin nt individuel pour l'élaboratio g Public Resources Manage En attente d'exéc n des contrats de performan IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 2024-04-08 2024-05-27 2024-06-17 2024-07-22 2025-01-18 ment at Central Governmen ution ce pour chacune des entrepri t Level ses publiques structurantes, assis sur leurs plans stratégi ques de développement ZR-COREF-410741-CS-CDS / Recrutement d'un consultant Component 3. Project and C Sélection de cons individuel international en v Direct - Internation En cours d'exécut IDA / 70200 hange Management, and E A posteriori ultants par entent 100,000.00 0.00 2024-03-01 2024-03-07 2024-03-11 2024-05-15 2025-05-15 ue de l'accompagnement po al ion mergency Response e directe ur la sélection de l'assistance en maitrise d'ouvrage du SIG eFIP_ MAX RESANDRASOA ZR-COREF-410746-CS-INDV Component 3. Project and C / Recrutement d'un consulta Open - Internationa En attente d'exéc IDA / 70200 hange Management, and E A posteriori Individuel 100,000.00 0.00 2024-03-24 2024-05-12 2024-06-02 2024-07-07 2025-01-03 nt individuel pour la producti l ution mergency Response on du guide de contrôle bud gétaire Page 13 ZR-COREF-410753-CS-INDV / Recrutement d'une équipe Component 1. Strengthenin de deux consultants nationa g Public Resources Manage En attente d'exéc ux pour l'analyse des rapport IDA / 70200 A posteriori Individuel Open - National 100,000.00 0.00 2024-03-24 2024-05-12 2024-06-02 2024-07-07 2025-01-03 ment at Central Governmen ution s d'exécution des lois de fin t Level ances de 2021 à 2023 (reddi tion des comptes) par la Soci été Civile ZR-COREF-410755-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage Open - Internationa En attente d'exéc IDA / 70200 A posteriori Individuel 100,000.00 0.00 2024-02-29 2024-04-18 2024-05-09 2024-06-13 2024-12-10 nt individuel pour la producti ment at Central Governmen l ution on de la stratégie de l'Etat ac t Level tionnaire ZR-COREF-414217-CS-INDV / Recrutement d'un consulta nt individuel chargé de dével Component 2. Supporting opper une application inform Resource Management at th En attente d'exéc IDA / 70200 A posteriori Individuel Open - National 100,000.00 0.00 2024-04-07 2024-05-26 2024-06-16 2024-07-21 2025-01-17 atique destinée à l'enregistre e Provincial Government Lev ution ment des contribuables (ass el ujettis) de quatre provinces de la RDC (Kasaï, Kasaï Centr al, Kasaï Oriental et Lomami) . ZR-COREF-414224-CS-INDV / Recrutement d'un consulta Component 2. Supporting nt individuel pour mener les Resource Management at th En attente d'exéc IDA / 70200 A posteriori Individuel Limited - National 50,000.00 0.00 2024-04-21 2024-04-26 2024-05-17 2024-06-21 2024-12-18 études de faisabilité et d'inst e Provincial Government Lev ution allation des panneaux solaire el s dans les quatre régies fina ncières provinciales ZR-COREF-417533-CS-INDV / Recrutement d’un consulta Component 1. Strengthenin nt international en vue du dé g Public Resources Manage Open - Internationa En cours d'exécut veloppement de la stratégie IDA / 70200 A posteriori Individuel 100,000.00 0.00 2024-05-19 2024-03-27 2024-07-07 2024-07-28 2024-09-01 2025-02-28 ment at Central Governmen l ion de mise en œuvre d'une solu t Level tion d'archivage électronique des dossiers des marchés pu blics ZR-COREF-419332-CS-INDV / Recrutement d'un Consulta nt Individuel pour mener l'ét Component 2. Supporting ude de faisabilité, dimension Resource Management at th En cours d'exécut nement et contrôle des trava IDA / 70200 A posteriori Individuel Open - National 50,000.00 0.00 2024-05-05 2024-04-03 2024-06-23 2024-07-14 2024-08-18 2025-02-14 e Provincial Government Lev ion ux d'installation du système el solaire des bâtiments des ad ministrations financières pro vinciales du Kasai, du Kasai Cent, du Kasai Or et Lomami ZR-COREF-419459-CS-CDS / Recrutement d'un Cabinet in Component 1. Strengthenin Sélection de cons ternational Expertise France, g Public Resources Manage Direct - Internation En cours d'exame IDA / 70200 A priori ultants par entent 2,035,184.00 0.00 2024-03-30 2024-04-09 2024-06-13 2024-12-10 chargé d’appuyer la Cour de ment at Central Governmen al n e directe s comptes dans la mise en œ t Level uvre de son plan stratégique ZR-COREF-344818-CS-CDS / Recrutement d'un Cabinet in Component 1. Strengthenin Sélection de cons ternational Expertise France, g Public Resources Manage Direct - Internation IDA / 70200 A posteriori ultants par entent 400,000.00 0.00 Annulé 2023-03-24 2023-04-10 2023-04-03 2023-06-07 2023-12-04 chargé d’appuyer la Cour de ment at Central Governmen al e directe s comptes dans la mise en œ t Level uvre de son plan stratégique ZR-COREF-420799-CS-CDS / recrutement d’un consultant Component 3. Project and C Sélection de cons (Firme) chargé de la vérificat En cours d'exécut IDA / 70200 hange Management, and E A posteriori ultants par entent Direct - National 350,000.00 0.00 2024-04-05 2024-04-05 2024-04-15 2024-04-10 2024-06-19 2024-12-16 ion de l’atteinte de CBP 4.2 e ion mergency Response e directe t de l’audit des Dépenses Eli gibles au Programme (DEP). ZR-COREF-423725-CS-INDV Component 1. Strengthenin / Recrutement d'un consulta g Public Resources Manage En attente d'exéc nt individuel pour la producti IDA / 70200 A posteriori Individuel Open - National 30,000.00 0.00 2024-04-29 2024-06-17 2024-07-08 2024-08-12 2025-02-08 ment at Central Governmen ution on du projet de plan de renfo t Level rcement des capacités des c ontrôleurs budgétaires Page 14