PROCUREMENT PLAN (Textual Part) Project information: [Haiti] [P173811] Project Implementation agency: [MSPP] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. PROCUREMENT Haiti : Haiti COVID-19 Response PLAN General Information Country: Haiti 2020-06-03 Bank’s Approval Date of the Original Procurement Plan: 2024-04-15 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P173811 GPN Date: 2020-08-03 Project Name: Haiti COVID-19 Response Loan / Credit No: IDA / D6010, IDA / E0620 Project Implementation Unit UGP/MSPP Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HT-AF-HEALTH-188377-GO-U N / Materiels et equipements Passation de marc Component 1: Emergency C En attente d' medicaux pour l'oxygenother IDA / D6010 A posteriori hés auprès des ag Direct 3,499,670.00 0.00 2020-04-10 2020-04-15 2020-05-20 2020-11-16 OVID-19 Response exécution apie/ transport, maintenance ences de l'ONU et installation compris HT-AF-HEALTH-188378-GO- Component 1: Emergency C Passation de marc DIR / equipements divers de IDA / D6010 A priori Direct 1,020,000.00 1,020,000.00 Signé 2020-05-10 2020-10-07 2020-05-15 2020-10-09 2020-06-19 2020-06-14 2020-12-16 OVID-19 Response hé de gré à gré protection individuelle (PPE) HT-AF-HEALTH-188380-GO- DIR / masks (1500000) and V Component 1: Emergency C Passation de marc IDA / D6010 A posteriori Direct 1,488,453.59 1,488,453.59 Signé 2020-05-17 2020-04-22 2020-05-22 2020-04-22 2020-06-26 2020-05-26 2020-12-23 TM (60000) test covid/ transp OVID-19 Response hé de gré à gré ort international inclus HT-AF-HEALTH-188382-GO- Component 1: Emergency C Passation de marc DIR / acquisition de 100000 IDA / D6010 A posteriori Direct 222,040.26 222,040.25 Signé 2020-05-07 2020-04-03 2020-05-12 2020-05-21 2020-06-16 2020-07-07 2020-12-13 OVID-19 Response hé de gré à gré masks KN95/ transport intern ational compris HT-AF-HEALTH-188383-GO- Component 1: Emergency C Passation de marc DIR / produits de desinfectan IDA / D6010 A posteriori Direct 600,000.00 0.00 Annulé 2020-08-17 2020-04-03 2020-08-22 2020-08-17 2020-09-12 2021-03-11 OVID-19 Response hé de gré à gré ts hydroalcooliques pour les mains HT-AF-HEALTH-177413-GO- DIR / Equipements divers de Component 1: Emergency C Passation de marc protection individuelle ( mas IDA / D6010 A priori Direct 3,000,000.00 0.00 Annulé 2020-06-02 2020-06-07 2020-06-28 2020-12-25 OVID-19 Response hé de gré à gré ques grands publics et chirur gicaux, gants, blouse etc...) HT-AF-HEALTH-177435-GO- Component 1: Emergency C Passation de marc DIR / achat de 60,000 tests C IDA / D6010 A priori Direct 1,488,453.50 0.00 Annulé 2020-06-02 2020-06-07 2020-06-28 2020-12-25 OVID-19 Response hé de gré à gré ovid-19 et 1500000 masques chirurgicaux HT-AF-HEALTH-177404-GO-U N / Materiels et equipements Passation de marc Component 1: Emergency C medicaux pour l'oxygenother IDA / D6010 A posteriori hés auprès des ag Direct 3,499,670.00 0.00 Annulé 2020-06-03 2020-06-08 2020-06-29 2020-12-26 OVID-19 Response apie, transport, maintenance ences de l'ONU et installation compris HT-AF-HEALTH-177443-GO- Component 1: Emergency C Passation de marc DIR / VTM kit and sterile nylo IDA / D6010 A posteriori Direct 650,000.00 0.00 Annulé 2020-06-08 2020-06-13 2020-07-18 2021-01-14 OVID-19 Response hé de gré à gré n flocked nasopharyngeal sw abs HT-AF-HEALTH-177451-GO- Component 1: Emergency C Passation de marc DIR / Achat de masques N95 IDA / D6010 A posteriori Direct 400,000.00 0.00 Annulé 2020-06-05 2020-06-10 2020-07-01 2020-12-28 OVID-19 Response hé de gré à gré ou KN95 pour le ministere de la Sante HT-AF-HEALTH-198609-GO-R FQ / Reproduction d'affiches Component 1: Emergency C Single Stage - One E IDA / D6010 A posteriori Demande de prix Limited 185,000.00 185,000.00 Signé 2020-10-09 2020-07-10 2020-10-13 2020-07-30 2020-10-14 de lavage des mains et de pr OVID-19 Response nvelope evention contre la COVID-19 HT-AF-HEALTH-198842-GO-R FQ / reproduction de depliant Component 1: Emergency C Single Stage - One E IDA / D6010 A posteriori Demande de prix Limited 102,087.00 186,997.03 Signé 2020-10-09 2020-07-10 2020-10-13 2020-07-30 2020-10-14 s et de feuillets pour sensibil OVID-19 Response nvelope isation grand public anti covi d-19 HT-AF-HEALTH-198843-GO- Component 1: Emergency C Passation de marc DIR / produits de desinfectan IDA / D6010 A posteriori Direct 159,325.18 159,325.18 Signé 2020-10-08 2020-08-18 2020-10-09 2020-08-18 2020-10-11 2020-09-09 2020-10-12 OVID-19 Response hé de gré à gré ts et de lavage des mains HT-AF-HEALTH-201108-GO-U N / acquisition et installation Passation de marc Component 1: Emergency C de systèmes solaires dans de IDA / D6010 A priori hés auprès des ag Direct 4,499,981.00 2,000,000.00 Signé 2020-10-22 2020-11-05 2020-10-23 2020-12-23 2020-10-30 2021-01-24 2021-10-25 OVID-19 Response s etablissements de santé pri ences de l'ONU oritaires dans le cadre de la r eponse à la Covid-19 HT-UGP-382744-GO-RFQ / A Component 3: Implementati Single Stage - One E cquisition de dix (10) miniva IDA / E0620 on Management and Monitor A posteriori Demande de prix Limited 220,000.00 0.00 Signé 2023-10-09 2023-10-03 2023-11-27 2023-11-21 2024-05-25 nvelope ns pour la DPSPE ing and Evaluation HT-UGP-382707-GO-RFQ / A Component 3: Implementati Single Stage - One E En cours d'ex cquisition de 40 motocyclette IDA / E0620 on Management and Monitor A posteriori Demande de prix Limited 120,000.00 0.00 2023-10-02 2023-11-20 2024-05-18 nvelope écution s pour la DPSPE ing and Evaluation HT-UGP-382702-GO-RFQ / A cquisition en deux (2) lots de Component 1: Emergency C Single Stage - One E medicaments et d'accessoire IDA / E0620 A posteriori Demande de prix Limited 357,714.36 0.00 Signé 2023-09-08 2023-10-11 2023-10-27 2024-01-03 2024-04-24 OVID-19 Response nvelope s divers pour la prise en char ge des pathologies infectueu ses HT-UGP-372506-GO-RFQ / A Component 3: Implementati Single Stage - One E En attente d' cquisition de meubles de bur IDA / E0620 on Management and Monitor A posteriori Demande de prix Limited - National 42,040.00 0.00 2024-04-29 2024-06-17 2024-12-14 nvelope exécution eau pour la DPSPE en trois (3 ing and Evaluation ) lots Page 1 HT-UGP-372496-GO-RFQ / A Component 3: Implementati Single Stage - One E En attente d' cquisition de matériels électr IDA / E0620 on Management and Monitor A posteriori Demande de prix Limited - National 224,800.00 0.00 2024-04-13 2024-05-25 2024-11-21 nvelope exécution oniques pour la DPSPE en six ing and Evaluation (6) lots HT-UGP-382742-GO-RFQ / Ki ts pour les sites de la DPSPE. Lot 1 : Kits de gestion des dé Component 1: Emergency C Single Stage - One E En cours d'ex IDA / E0620 A posteriori Demande de prix Limited - National 551,750.00 0.00 2024-04-10 2024-04-03 2024-05-22 2024-11-18 chets ; Lot 2 : Kits de produit OVID-19 Response nvelope écution s d'assainissement ; Lot 3 : Ki ts de travail pour les officiers sanitaires. HT-UGP-419961-GO-DIR / Ac quisition de onze (11) véhicul Component 3: Implementati Passation de marc Direct - Internation En attente d' es pour la DELR au profit des IDA / E0620 on Management and Monitor A posteriori 770,000.00 0.00 2024-04-21 2024-04-28 2024-06-02 2024-11-29 hé de gré à gré al exécution Equipes Départementales d'I ing and Evaluation nvestigation et de Réponse ( EDIR). NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HT-AF-HEALTH-188384-NC-D IR / communication interpers Component 1: Emergency C Passation de marc IDA / D6010 A posteriori Direct 500,000.00 500,000.00 Signé 2020-05-15 2020-06-24 2020-05-20 2020-05-15 2020-06-24 2020-06-28 2020-12-21 onnelle et communautaire en OVID-19 Response hé de gré à gré reponse au COVID-19 HT-AF-HEALTH-188376-NC-U Passation de marc N / preparation de la capacit Component 1: Emergency C IDA / D6010 A posteriori hés auprès des ag Direct 5,961,291.00 5,961,291.00 Signé 2020-04-16 2020-04-07 2020-04-21 2020-04-07 2020-05-26 2020-04-26 2020-11-22 e de reponse du gouverneme OVID-19 Response ences de l'ONU nt a l'epidemie COVID-19 HT-AF-HEALTH-177449-NC-D IR / Communication interpers Component 1: Emergency C Passation de marc IDA / D6010 A priori Direct 500,000.00 0.00 Annulé 2020-06-04 2020-06-09 2020-07-14 2021-01-10 onnelle et communautaire en OVID-19 Response hé de gré à gré reponse au COVID-19 HT-AF-HEALTH-199681-NC-U N / acquisition et installation Passation de marc Component 1: Emergency C de systeme d'energie solaire IDA / D6010 A posteriori hés auprès des ag Direct 4,499,981.00 0.00 Annulé 2020-10-19 2020-10-16 2020-10-21 2020-10-16 2020-10-31 2021-04-29 OVID-19 Response dans les etablissements de s ences de l'ONU ante prioritaires pour la repo nse a la Covid-19 HT-AF-HEALTH-201104-NC-U Passation de marc N / Transport et entreposage Component 1: Emergency C IDA / D6010 A priori hés auprès des ag Direct 200,000.00 215,341.00 Signé 2020-10-23 2021-08-27 2020-10-24 2021-09-22 2020-11-05 2021-08-14 2021-05-04 de materiels de protection in OVID-19 Response ences de l'ONU dividuelle contre la Covid-19 HT-UGP-331887-NC-DIR / Re nforcement de la Maternité F Component 1: Emergency C Passation de marc IDA / E0620 A posteriori Direct - National 595,720.00 0.00 Signé 2022-11-01 2022-11-01 2022-11-02 2022-11-02 2022-11-14 2022-12-02 2023-11-09 oyer Saint Camille pour des s OVID-19 Response hé de gré à gré ervices liés à la Covid-19 CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HT-UGP-273334-CS-LCS / Au Component 3: Implementati dit Comptable et financier du Sélection au moin En cours d'exécut IDA / D6010 on Management and Monitor A posteriori Open - National 30,000.00 0.00 2022-01-24 2022-02-04 2022-01-31 2022-02-14 2022-02-24 2022-03-14 2022-04-11 2022-03-28 2022-07-26 2022-04-25 2022-05-09 2024-05-08 Projet COVID-19 pour la pério dre coût ion ing and Evaluation de allant de 2020 à 2024 HT-UGP-419958-CS-LCS / Re crutement d'une firme pour l Component 3: Implementati e montage de la stratégie de Sélection au moin En cours d'exame IDA / E0620 on Management and Monitor A posteriori Open - National 200,000.00 0.00 2024-04-15 2024-04-15 2024-04-22 2024-05-20 2024-06-03 2024-06-17 2024-07-15 2024-08-05 2025-02-01 gestion des déchets biomédi dre coût n ing and Evaluation caux et autres déchets issus des activités de soins pour la DPSPE HT-UGP-419959-CS-LCS / Re crutement d'une firme pour l Component 3: Implementati a création d'une base de don Sélection au moin En attente d'exéc IDA / E0620 on Management and Monitor A posteriori Open - National 45,000.00 0.00 2024-04-28 2024-05-05 2024-06-02 2024-06-16 2024-06-30 2024-07-28 2024-08-18 2025-02-14 nées et d'un système de suiv dre coût ution ing and Evaluation i des actions sur l'hygiène po ur les officiers sanitaires de l a DPSPE INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual HT-AF-HEALTH-188379-CS-C DS / appui au niveau des inst Sélection de cons Component 1: Emergency C En cours d'exécut itutions sanitaires pour activi IDA / D6010 A posteriori ultants par entent Direct 1,400,000.00 0.00 2020-08-19 2020-10-14 2020-08-29 2020-11-02 2021-05-01 OVID-19 Response ion tes de controle, de preventio e directe n et pour les services essenti els contre le COVID-19 HT-AF-HEALTH-199682-CS-I NDV / Recrutement d'un cons Component 2: Health Syste IDA / D6010 A posteriori Individuel Direct 36,000.00 15,000.00 Signé 2020-10-15 2020-10-16 2020-10-18 2020-10-27 2020-10-21 2020-10-30 2020-10-27 2020-11-26 2021-04-25 ultant adjoint au specialiste e m Strengthening n passation des marches HT-AF-HEALTH-201107-CS-C DS / Appui technique en fave Sélection de cons ur des entités contractualisé Component 1: Emergency C IDA / D6010 A priori ultants par entent Direct 430,000.00 0.00 Annulé 2020-10-23 2020-10-29 2020-11-14 2021-05-13 es dans le contexte de COVI OVID-19 Response e directe D-19 et de continuité du FBR au niveau de 4 departements sanitaires HT-AF-HEALTH-213555-CS-C Sélection de cons DS / Assistance technique da Component 1: Emergency C IDA / D6010 A posteriori ultants par entent Direct 430,000.00 631,894.00 Signé 2020-08-20 2020-08-20 2020-08-30 2020-08-29 2020-11-03 2021-02-06 2021-05-02 ns le contexte de la Covid-19 OVID-19 Response e directe pour la continuite de la mise en oeuvre du FBR Page 2 HT-UGP-331895-CS-CDS / Co Sélection de cons mmunication communautaire Component 1: Emergency C En cours d'exécut IDA / E0620 A posteriori ultants par entent Direct - National 600,000.00 0.00 2022-11-01 2022-11-15 2022-11-07 2023-08-21 2022-11-24 2023-11-19 et sensibilisation de la popul OVID-19 Response ion e directe ation contre la Covid-19/ FOS REF HT-UGP-372499-CS-INDV / R Component 3: Implementati En cours d'exécut ecrutement d'un Manager de IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-07-24 2023-08-04 2023-08-28 2023-09-04 2023-09-18 2024-09-12 ion flotte pour la gestion des véh ing and Evaluation icules de l'UGP HT-UGP-372500-CS-INDV / R Component 3: Implementati En cours d'exécut ecrutement d'un Officier Juni IDA / E0620 on Management and Monitor A posteriori Individuel Limited 33,000.00 0.00 2023-07-24 2024-01-25 2023-07-31 2023-08-07 2023-08-28 2024-08-22 ion or de Suivi et d'evaluation ing and Evaluation HT-UGP-382725-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire de l'Ouest ing and Evaluation - gestionnaire de fonds Vacci nation Covid-19 HT-UGP-382723-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire du Nord - ing and Evaluation gestionnaire de fonds Vaccin ation Covid-19 HT-UGP-382722-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire du Nord-O ing and Evaluation uest - gestionnaire de fonds Vaccination Covid-19 HT-UGP-382724-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire du Nord-E ing and Evaluation st - gestionnaire de fonds Va ccination Covid-19 HT-UGP-382726-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire de la Gran ing and Evaluation de-Anse gestionnaire de fond s Vaccination Covid-19 HT-UGP-382730-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire des Nippe ing and Evaluation s - gestionnaire de fonds Vac cination Covid-19 HT-UGP-382729-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire du Sud - g ing and Evaluation estionnaire de fonds Vaccinat ion Covid-19 HT-UGP-382728-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire de l'Artibo ing and Evaluation nite - gestionnaire de fonds V accination Covid-19 HT-UGP-382727-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire du Centre- ing and Evaluation gestionnaire de fonds Vaccin ation Covid-19 HT-UGP-382731-CS-INDV / R ecrutement d'un comptable Component 3: Implementati En cours d'exame départemental en appui à la IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-09-25 2023-10-16 2023-10-30 2023-11-06 2023-11-20 2024-11-14 n direction sanitaire ddu Sud-E ing and Evaluation st - gestionnaire de fonds Va ccination Covid-19 HT-UGP-372505-CS-INDV / R Component 3: Implementati ecrutement d'un Auditeur Fin En attente d'exéc IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 24,000.00 0.00 2023-08-24 2023-09-28 2023-10-05 2023-10-19 2024-04-16 ancier Interne pour renforcer ution ing and Evaluation l'équipe fiduciaire de l'UGP HT-UGP-419941-CS-INDV / R Component 3: Implementati En attente d'exéc ecrutement d'un (e) Spécialis IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 18,000.00 0.00 2024-04-08 2024-05-13 2024-05-27 2024-06-10 2025-06-05 ution te en Santé Publique pour la ing and Evaluation DPSPE HT-UGP-419942-CS-CDS / Re Component 3: Implementati Sélection de cons crutement d'un (e) Infirmier ( En cours d'exécut IDA / E0620 on Management and Monitor A posteriori ultants par entent Direct - National 18,000.00 0.00 2023-08-22 2024-04-15 2023-09-01 2023-09-29 2024-09-23 ère) Spécialiste en Maladie In ion ing and Evaluation e directe fectueuse pour la DPSPE HT-UGP-419945-CS-INDV / R Component 3: Implementati En attente d'exéc ecrutement d'un (e) Informat IDA / E0620 on Management and Monitor A posteriori Individuel Open - National 12,000.00 0.00 2024-04-10 2024-05-15 2024-05-22 2024-06-05 2025-05-31 ution icien (ènne) pour la DPSPE ing and Evaluation HT-UGP-419955-CS-CDS / Re crutement d'un Conseiller Te Component 3: Implementati Sélection de cons En attente d'exéc chnique au niveau central du IDA / E0620 on Management and Monitor A posteriori ultants par entent Direct - National 235,627.37 0.00 2024-01-03 2024-01-13 2024-02-17 2025-02-11 ution MSPP dans la mise en oeuvre ing and Evaluation e directe du Financement Basé sur les Résultats (FBR-Haïti) Page 3