PLAN DE ADQUISICIONES AR Buenos Aires Flood risk management (P145686) Argentina, IBRD/IDA, FY: 2016, Team Leader(s): Maria Catalina Ramirez, Christophe Prevost PROCUREMENT Argentina : AR Flood Risk Management Support Project for the City of Buenos Aires PLAN General Information Country: Argentina 2016-11-03 Bank’s Approval Date of the Original Procurement Plan: 2023-04-13 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P145686 GPN Date: Project Name: AR Flood Risk Management Support Project for the City of Buenos Aires Loan / Credit No: IBRD / 86280 Multilateral Credit Organizations Financing Unit Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned AR-UFOMC-2871-CW-RFB / A Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E 2017-03-0 IBRD / 86280 Posterior Open - National 520,000.00 0.00 Cancelado 2016-05-19 2016-05-24 2016-07-05 2016-08-04 2016-09-08 gua y Cloacas en Nueva Espe re s nvelope 7 ranza AR-UFOMC-2890-CW-RFB / O Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E 2017-06-0 bras complementarias de me IBRD / 86280 Posterior Open - National 2,912,000.00 0.00 Cancelado 2016-08-19 2016-08-24 2016-10-05 2016-11-04 2016-12-09 re s nvelope 7 joramiento en Lago Soldati AR-UFOMC-3473-CW-RFB / C Flood Mitigation Infrastructu Solicitud de oferta Open - Internationa Single Stage - One E 36,582,000.0 En ejecució 2015-04-1 onstrucción de ARTEH, ramal IBRD / 86280 Previa 0.00 2014-06-23 2014-06-28 2014-08-09 2014-09-08 2016-11-30 2014-10-13 re s l nvelope 0 n 1 Asturias Sur, Nágera y Villa 6 AR-UFOMC-3720-CW-RFB / C Flood Mitigation Infrastructu Solicitud de oferta Open - Internationa Single Stage - One E 158,080,000. En ejecució 2017-06-2 IBRD / 86280 Previa 0.00 2015-06-02 2015-08-18 2015-08-18 2015-06-07 2015-10-27 2015-11-26 2015-12-31 onstrucción segundo emisari re s l nvelope 00 n 3 o Aº Vega AR-UFOMC-20566-CW-RFB / Obras de Desagües Pluviales de la Cuenca Cildáñez - Ram al Martí y Castañares-Primer Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E 20,000,000.0 2018-08-2 IBRD / 86280 Previa Open - National 0.00 Cancelado 2017-11-01 2017-11-06 2017-12-18 2018-01-17 2018-02-21 a Etapa, mediante la ejecució re s nvelope 0 0 n de conductos rectangulare s y circulares con sus respect ivas cámaras, sumideros, ne xos y demás componentes s ecundarios AR-UFOMC-3474-CW-RFB / C Flood Mitigation Infrastructu Solicitud de oferta Open - Internationa Single Stage - One E 70,002,400.0 2018-03-2 onstrucción de tres grupos d IBRD / 86280 Previa 0.00 Cancelado 2017-06-01 2017-06-06 2017-09-11 2017-07-18 2017-08-17 2017-09-21 re s l nvelope 0 0 e ramales secundarios Aº Mal donado AR-UFOMC-92169-CW-RFB / GESTIÓN INTEGRAL DE AGUA Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E 24,000,000.0 12,632,426. 2019-10-2 IBRD / 86280 Previa Open - National Firmado 2019-01-10 2019-05-29 2019-01-15 2019-09-10 2019-02-26 2019-10-22 2019-03-28 2019-11-25 2019-05-02 2020-02-10 S URBANAS ÁREAS MARGINA re s nvelope 0 47 9 LES DE CUENCA CILDAÑEZ E TAPA II AR-UFOMC-28498-CW-RFB / Flood Mitigation Infrastructu Solicitud de oferta Open - Internationa Single Stage - One E 70,002,400.0 2018-03-2 Construcción de tres grupos IBRD / 86280 Previa 0.00 Cancelado 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 re s l nvelope 0 0 de ramales secundarios A° M aldonado AR-UFOMC-115113-CW-RFB Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E 18,000,000.0 2020-11-0 / Construcción de los Ramale IBRD / 86280 Previa Open - National 0.00 Cancelado 2020-01-15 2020-01-20 2020-03-02 2020-04-01 2020-05-06 re s nvelope 0 2 s Secundarios del Arroyo Mal donado Grupo D AR-UFOMC-204786-CW-RFB / AMPLIACION DE LA RED SEC Flood Mitigation Infrastructu Solicitud de oferta Open - Internationa Single Stage - One E 40,000,000.0 53,496,751. 2023-06-3 IBRD / 86280 Previa Firmado 2020-11-20 2021-03-26 2020-11-25 2021-06-22 2021-01-06 2021-06-30 2021-02-05 2021-09-20 2021-03-31 2021-11-05 UNDARIA DE RAMALES DE LA re s l nvelope 0 10 0 S CUENCAS MALDONADO, VE GA Y CILDAÑEZ AR-UFOMC-40376-CW-RFB / Sub - Componente 2.2 Constr ucción de tres grupos de ram ales C - D - E para la cuenca Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E 20,000,000.0 2018-11-0 IBRD / 86280 Previa Open - National 0.00 Cancelado 2018-01-09 2018-04-27 2018-01-14 2018-03-06 2018-04-05 2018-05-10 del Arroyo Maldonado: Llam re s nvelope 0 6 ado a LPN para la obra "Con strucción de los Ramales Sec undarios del Arroyo Maldona do GRUPO C" AR-UFOMC-115115-CW-RFB Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E 18,000,000.0 2021-04-0 / Construcción de los Ramale IBRD / 86280 Previa Open - National 0.00 Cancelado 2020-06-15 2020-06-20 2020-08-01 2020-08-31 2020-10-05 re s nvelope 0 3 s Secundarios del Arroyo Mal donado Grupo E AR-UFOMC-241731-CW-RFB / CONTRATACION DE LA OBR Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E Otro (con campo 2022-04-1 A ACCESIBILIDAD PARA EL U IBRD / 86280 Posterior Open - National 1,500,000.00 514,870.66 Firmado 2021-06-30 2021-07-26 2021-07-05 2021-09-24 2021-08-16 2021-10-15 2021-09-15 2021-10-27 2021-10-20 2021-11-05 re s nvelope para explicación) 8 SO PÚBLICO DEL RESERVORI O DEL PARQUE INDOAMERIC ANO Documento de Ad AR-UFOMC-267868-CW-RFB quisiciones con e / Contratación obra regenera Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E nfoque nacional - 2022-10-0 IBRD / 86280 Posterior Open - National 4,950,000.00 0.00 Cancelado 2021-12-13 2022-01-03 2021-12-18 2022-01-29 2022-02-28 2022-04-04 ción Arroyo Medrano Parque re s nvelope Proceso a 2 sobre 1 Saavedra s (No documento estándar del Banc o) Documento de Ad quisiciones con e AR-UFOMC-279924-CW-RFB Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E nfoque nacional - 2023-03-2 IBRD / 86280 Posterior Open - National 700,000.00 0.00 Cancelado 2022-06-01 2022-06-30 2022-06-06 2022-07-18 2022-08-17 2022-09-21 / Calles Verdes "CASTRO" re s nvelope Proceso de un sob 0 re (No documento estándar del Banc o) Documento de Ad quisiciones con e AR-UFOMC-282332-CW-RFB Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E nfoque nacional - 2023-04-1 / Calles Verdes "SANCHEZ DE IBRD / 86280 Posterior Open - National 700,000.00 0.00 Cancelado 2022-07-01 2022-07-06 2022-08-17 2022-09-16 2022-10-21 re s nvelope Proceso de un sob 9 BUSTAMANTE" re (No documento estándar del Banc o) Documento de Ad quisiciones con e AR-UFOMC-309154-CW-RFB Flood Mitigation Infrastructu Solicitud de oferta Single Stage - Two E nfoque nacional - Ejecución p 2023-07-1 / RESERVORIO PARQUE SARM IBRD / 86280 Posterior Open - National 3,900,000.00 0.00 2022-08-12 2022-08-17 2022-09-28 2022-12-11 2023-01-15 re s nvelope Proceso a 2 sobre endiente 4 IENTO - ETAPA 2 s (No documento estándar del Banc o) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Page 1 AR-UFOMC-2868-GO-RFQ / V Flood Mitigation Infrastructu Solicitud de cotiza Single Stage - One E ehículo aéreo de observación IBRD / 86280 Posterior Open - National 50,000.00 0.00 Cancelado 2016-04-27 2016-06-22 2016-12-19 re ciones nvelope no tripulado (Drone) AR-UFOMC-2866-GO-RFQ / M Institutional Development fo Solicitud de cotiza Single Stage - One E IBRD / 86280 Posterior Open - National 20,000.00 0.00 Cancelado 2016-08-17 2016-10-12 2017-04-10 oto triciclo para cargas (x 2) r Flood Risk Management ciones nvelope AR-UFOMC-2869-GO-RFB / V Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 480,000.00 0.00 Cancelado 2016-04-11 2016-04-16 2016-05-28 2016-06-27 2016-08-01 2017-01-28 ehículos anfibio (x 4) r Flood Risk Management s nvelope AR-UFOMC-2874-GO-RFB / Tr Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 150,000.00 0.00 Cancelado 2016-09-11 2016-09-16 2016-10-28 2016-11-27 2017-01-01 2017-06-30 ailer para carga general (x 3) r Flood Risk Management s nvelope AR-UFOMC-2870-GO-RFB / E quipamiento p/emergencias ( Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 670,000.00 0.00 Cancelado 2016-05-11 2016-05-16 2016-06-27 2016-07-27 2016-08-31 2017-02-27 varios lotes): Grupos electróg r Flood Risk Management s nvelope enos x 12 y Grupos portátiles de iluminación x 4. AR-UFOMC-2881-GO-RFB / E Institutional Development fo Solicitud de oferta Single Stage - One E Ejecución pe IBRD / 86280 Posterior Open - National 170,000.00 0.00 2016-05-11 2016-05-16 2016-06-27 2016-07-27 2016-08-31 2017-02-27 quipo p/inspección de condu r Flood Risk Management s nvelope ndiente ctos AR-UFOMC-2873-GO-RFB / M Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 480,000.00 0.00 Cancelado 2016-05-21 2016-05-26 2016-07-07 2016-08-06 2016-09-10 2017-03-09 aquinaria pesada r Flood Risk Management s nvelope AR-UFOMC-3470-GO-RFB / C amiones (4 lotes): camión de Institutional Development fo Solicitud de oferta Single Stage - One E salvataje (de vadeo), camión IBRD / 86280 Posterior Open - National 1,452,000.00 0.00 Cancelado 2016-04-13 2016-04-18 2016-05-30 2016-06-29 2016-08-03 2017-01-30 r Flood Risk Management s nvelope furgón, camión de rescate co n plataforma, pick uo 4x4 do ble cabina (x4) AR-UFOMC-30883-GO-RFB / ADQUISICIÓN EQUIPOS NÁUT Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 369,000.00 0.00 Cancelado 2017-10-17 2017-10-22 2017-12-03 2018-01-02 2018-02-06 2018-08-05 ICOS PARA LA EMERGENCIA r Flood Risk Management s nvelope DE DEFENSA CIVIL AR-UFOMC-23766-GO-RFQ / Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 300,000.00 0.00 Cancelado 2017-06-01 2017-06-06 2017-07-18 2017-08-17 2017-09-21 2018-03-20 Software Science on sphere r Flood Risk Management s nvelope AR-UFOMC-2897-GO-RFB / E Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 290,000.00 0.00 Cancelado 2016-05-21 2016-05-26 2016-07-07 2016-08-06 2016-09-10 2017-03-09 quipo desobstructor de tuber r Flood Risk Management s nvelope ías AR-UFOMC-23762-GO-RFB / Institutional Development fo Solicitud de oferta Single Stage - One E VEHICULOS TERRESTRES PAR IBRD / 86280 Posterior Open - National 997,000.00 0.00 Cancelado 2017-09-18 2017-09-23 2017-11-04 2017-12-04 2018-01-08 2018-07-07 r Flood Risk Management s nvelope A DEFENSA CIVIL AR-UFOMC-168832-GO-DIR / Institutional Development fo Adquisición direct Vehículos Terrestres para la IBRD / 86280 Posterior Direct 700,000.00 561,665.26 Finalizado 2020-04-15 2020-05-14 2020-04-15 2020-05-04 2020-04-20 2020-05-20 2020-05-31 2020-11-12 r Flood Risk Management a Emergencia AR-UFOMC-20563-GO-RFQ / Equipamiento para el fortalec imiento del área de contamin Institutional Development fo Solicitud de cotiza Single Stage - One E IBRD / 86280 Posterior Open - National 50,000.00 39,563.15 Firmado 2021-07-20 2021-09-14 2021-10-25 2022-03-13 ación de la Agencia de Protec r Flood Risk Management ciones nvelope ción Ambiental en relación d e la calidad del agua en arro yos. AR-UFOMC-294604-NC-RFQ / Institutional Development fo Adquisición direct IBRD / 86280 Posterior Direct 30,000.00 23,260.25 Firmado 2022-05-16 2022-05-02 2022-05-21 2022-05-12 2022-06-25 2022-05-27 2022-12-22 SOFTWARE MODELACIÓN MI r Flood Risk Management a KE1D-2D AR-UFOMC-332048-GO-RFQ Institutional Development fo Solicitud de cotiza Single Stage - One E / Adquisición Equipamientos IBRD / 86280 Posterior Open - National 74,000.00 0.00 Cancelado 2022-12-24 2023-02-18 2023-08-17 r Flood Risk Management ciones nvelope Topógrafos AR-UFOMC-354332-GO-DIR / Servicio de Mantenimiento y capacitación (SMA) de las lic Institutional Development fo Adquisición direct Ejecución pe IBRD / 86280 Posterior Direct - National 75,000.00 0.00 2023-04-13 2023-04-13 2023-05-02 2023-10-29 encias 71400 y 71401 (anteri r Flood Risk Management a ndiente ormente denominadas16483 y 16484) del software MIKE 1 D-2D NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-95703-NC-RFQ / I mplementación de la Estrate Institutional Development fo Solicitud de cotiza Single Stage - One E gia de Comunicación Social p IBRD / 86280 Posterior Limited 100,000.00 0.00 En ejecución 2019-02-16 2019-04-13 2019-10-10 r Flood Risk Management ciones nvelope ara la Gestión del Riesgo de I nundaciones - Etapa I AR-UFOMC-100333-NC-RFB / Institutional Development fo Solicitud de oferta Single Stage - One E Implementación de la estrate IBRD / 86280 Posterior Open - National 200,000.00 0.00 En ejecución 2019-02-15 2019-03-13 2019-02-20 2019-04-03 2019-05-03 2019-06-07 2019-12-04 r Flood Risk Management s nvelope gia de comunicación social - Etapa 2 AR-UFOMC-115118-NC-RFQ / Contratación de Encuestas p Solicitud de cotiza Single Stage - One E IBRD / 86280 Project Management Posterior Limited 100,000.00 70,898.93 Firmado 2019-08-05 2021-03-17 2019-09-30 2021-04-14 2020-03-28 ara la Evaluación Social Inter ciones nvelope media del Proyecto AR-UFOMC-115120-NC-RFQ / Solicitud de cotiza Single Stage - One E Ejecución pe Contratación de las encuesta IBRD / 86280 Project Management Posterior Limited 100,000.00 0.00 2021-10-05 2021-11-30 2022-05-29 ciones nvelope ndiente s para la Evaluación social Fi nal del Proyecto AR-UFOMC-2885-NC-RFQ / L Institutional Development fo Solicitud de cotiza Single Stage - One E IBRD / 86280 Posterior Open - National 100,000.00 0.00 Cancelado 2017-04-25 2017-06-20 2017-12-17 ogística para el seminario int r Flood Risk Management ciones nvelope ernacional AR-UFOMC-239907-NC-RFB / COMUNICACION 3 - READECU Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 700,000.00 646,220.30 Firmado 2021-06-28 2021-06-24 2021-07-03 2021-07-26 2021-08-14 2021-08-05 2021-09-13 2021-08-24 2021-10-18 2021-08-24 2022-04-16 ACION Y OPERACION DEL CE r Flood Risk Management s nvelope NTRO VIVENCIAL DEL AGUA E N ECOPARQUE AR-UFOMC-239900-NC-RFQ / DESARROLLO DE SEÑALETIC Institutional Development fo Solicitud de cotiza Single Stage - One E IBRD / 86280 Posterior Open - National 100,000.00 154,212.52 Firmado 2021-07-06 2021-08-31 2021-11-12 2022-02-27 A RELACIONADA A LA GESTIO r Flood Risk Management ciones nvelope N DEL RIESGO DE INUNDACI ONES Page 2 AR-UFOMC-241302-NC-RFB / SERVICIO DE MANTENIMIENT O E INTEGRACION DEL SISTE Institutional Development fo Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Open - National 2,700,000.00 1,748,305.00 Firmado 2021-06-28 2021-07-23 2021-07-03 2021-10-18 2021-08-14 2021-11-15 2021-09-13 2022-05-04 2021-10-18 2022-06-21 2022-04-16 MA DE ALERTA TEMPRANA HI r Flood Risk Management s nvelope DROMETEOROLÓGICA DE LA CIUDAD AUTÓNOMA DE BUE NOS AIRES. (SATHCABA) AR-UFOMC-241304-NC-RFQ / PLATAFORMAS AUDIOVISUAL Solicitud de cotiza Single Stage - One E IBRD / 86280 Project Management Posterior Open - National 50,000.00 64,841.49 Firmado 2021-07-03 2021-07-20 2021-08-28 2021-08-05 2022-02-24 ES - ACTUALIZACION PAGINA ciones nvelope WEB PLAN HIDRAULICO AR-UFOMC-250309-NC-RFQ / Relevamiento de Datos para Estudios de Suelo y Agua Su Solicitud de cotiza Single Stage - One E IBRD / 86280 Project Management Posterior Open - National 70,000.00 87,495.01 Firmado 2021-08-30 2021-09-14 2021-10-25 2021-10-07 2022-04-23 bterránea - Parámetros Ambi ciones nvelope entales e Hidrogeológicos - P arque Saavedra - Parque Sar miento - Cuenca Medrano AR-UFOMC-283723-NC-RFQ / ESTUDIO GEOTÉCNICO PARA Solicitud de cotiza Single Stage - One E IBRD / 86280 Project Management Posterior Open - National 99,950.00 91,975.88 Firmado 2022-04-06 2022-06-01 2022-05-09 2022-11-28 PROYECTO DE RELLENO COS ciones nvelope TERO Y PLAYA PÚBLICA AR-UFOMC-292284-NC-RFQ / ESTUDIO SOBRE TOMA DE M Flood Mitigation Infrastructu Solicitud de oferta Single Stage - One E IBRD / 86280 Posterior Limited 99,900.00 0.00 Cancelado 2022-05-16 2022-05-02 2022-05-21 2022-05-02 2022-07-02 2022-05-06 2022-08-01 2022-09-05 2023-03-04 UESTRA Y ANÁLISIS DE CALID re s nvelope AD DE AGUA, SEDIMENTOS Y BATIMETRÍA AR-UFOMC-303276-NC-RFQ / IMPLEMENTACIÓN DE RECOR Institutional Development fo Solicitud de cotiza Single Stage - One E RIDO EDUCATIVO Y DE CONS IBRD / 86280 Posterior Open - National 70,000.00 60,123.74 Firmado 2022-07-16 2022-09-10 2022-07-28 2023-03-09 r Flood Risk Management ciones nvelope CIENTIZACIÓN EN RESERVOR IO DEL ARROYO CILDAÑEZ - ETAPA 1 AR-UFOMC-307967-NC-DIR / Adquisición direct IBRD / 86280 Project Management Posterior Direct - National 55,000.00 5,699.63 Firmado 2022-06-15 2022-06-14 2022-06-20 2022-06-14 2022-07-25 2022-06-30 2023-01-21 Auditoría 21-22 a AR-UFOMC-334579-NC-RFQ / Servicio de relevamiento y le vantamiento de datos para el estudio de Evaluación Final d Solicitud de cotiza Single Stage - One E IBRD / 86280 Project Management Posterior Limited 98,000.00 0.00 En ejecución 2023-01-18 2023-01-12 2023-03-15 2023-09-11 e Resultados e Impactos Soci ciones nvelope ales del Proyecto de Asistenc ia a la Gestión del Riesgo de I nundaciones para la Ciudad de Buenos Aires AR-UFOMC-335997-NC-RFQ / VISIBILIZACIÓN DE ARROYOS Institutional Development fo Solicitud de cotiza Single Stage - One E IBRD / 86280 Posterior Open - National 75,000.00 0.00 En ejecución 2023-01-24 2023-03-21 2023-09-17 EN LA CIUDAD DE BUENOS AI r Flood Risk Management ciones nvelope RES - ETAPA 2 - CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-3471-CS-LCS / Au Selección basada Ejecución pendien ditoría 1ra etapa (es una aud IBRD / 86280 Project Management Posterior Open - National 50,000.00 0.00 2015-03-02 2015-03-23 2015-05-06 2015-06-03 2015-07-03 2015-08-07 2015-09-11 2016-03-09 en el menor costo te itoría financiera). AR-UFOMC-20569-CS-QCBS / Institutional Development fo Selección basada IBRD / 86280 Posterior Open - National 450,000.00 0.00 Cancelado 2016-10-15 2016-11-05 2016-12-19 2017-01-16 2017-02-15 2017-03-22 2017-04-26 2018-04-26 Modelo Probabilístico de Ries r Flood Risk Management en calidad y costo go AR-UFOMC-28316-CS-QBS / Selección basada Revisión del Proyecto Ejecuti IBRD / 86280 Project Management Previa Open - National 1,500,000.00 696,220.49 Firmado 2017-09-01 2017-09-22 2017-09-14 2017-11-05 2018-03-08 2017-12-03 2018-01-02 2018-07-19 2018-02-01 2018-08-23 2018-03-08 2018-12-28 2019-03-08 en calidad vo de los Grupos D y E + Ra males Vega AR-UFOMC-20564-CS-QCBS / Institutional Development fo Selección basada Open - Internationa IBRD / 86280 Previa 7,332,000.00 0.00 En ejecución 2013-07-20 2013-08-10 2013-09-23 2013-10-21 2013-11-20 2013-12-25 2014-01-29 2015-01-29 Inspección segundo emisario r Flood Risk Management en calidad y costo l Aº Vega AR-UFOMC-47959-CS-QCBS / SERVICIOS DE CONSULTORÍA PARA LA ELABORACIÓN DEL Flood Mitigation Infrastructu Selección basada DISEÑO DE OBRAS DE EVACU IBRD / 86280 Posterior Open - National 981,572.00 0.00 Cancelado 2018-02-14 2018-03-09 2018-03-20 2018-03-12 2018-05-03 2018-05-31 2018-06-30 2018-08-04 2018-09-08 2019-09-08 re en calidad y costo ACIÓN DE DESAGÜES DE LAS CUENCAS ALTAS DE LOS ARR OYOS MALDONADO Y CILDA ÑEZ AR-UFOMC-68662-CS-CQS / SERVICIO DE CONSULTORÍA PARA LA EJECUCIÓN DE LOS Institutional Development fo Selección basada ESTUDIOS COMPLEMENTARIO IBRD / 86280 Posterior Open - National 500,000.00 0.00 En ejecución 2018-07-20 2018-08-10 2018-09-23 2018-10-21 2018-11-20 2018-12-25 2019-01-29 2020-01-29 r Flood Risk Management en calidad y costo S SOBRE EL IMPACTO DE LA DESCARGA DEL ARROYO VEG A SOBRE LA TOMA DE AGUA DE AySA TT3 AR-UFOMC-20771-CS-QCBS / Institutional Development fo Selección basada Open - Internationa Mecanismo de financiamient IBRD / 86280 Previa 2,700,000.00 0.00 Cancelado 2017-08-03 2017-08-24 2017-10-07 2017-11-04 2017-12-04 2018-01-08 2018-02-12 2019-02-12 r Flood Risk Management en calidad y costo l o del riesgo AR-UFOMC-83703-CS-LCS / R ealización integral de recurso s didácticos gráficos y multi mediales para la iniciativa ed Institutional Development fo Selección basada IBRD / 86280 Posterior Open - National 100,000.00 0.00 En ejecución 2018-10-24 2018-11-14 2018-12-28 2019-01-25 2019-01-15 2019-02-24 2019-01-28 2019-03-31 2019-05-05 2019-11-01 ucativa de nombre provisorio r Flood Risk Management en el menor costo "Proyecto Educativo del Plan Hidráulico en el marco del Pr ograma Ciudadanía Global" ( PEPHPCG) AR-UFOMC-2872-CS-QCBS / Institutional Development fo Selección basada IBRD / 86280 Posterior Open - National 550,000.00 0.00 Cancelado 2017-03-14 2017-04-04 2017-05-18 2017-06-15 2017-07-15 2017-08-19 2017-09-23 2018-09-23 Campaña publicitaria (diseño r Flood Risk Management en calidad y costo ) AR-UFOMC-2891-CS-QCBS / Flood Mitigation Infrastructu Selección basada IBRD / 86280 Posterior Open - National 260,000.00 0.00 Cancelado 2020-06-15 2020-07-06 2020-08-19 2020-09-16 2020-10-16 2020-11-20 2020-12-25 2021-12-25 Evaluación final re en calidad y costo AR-UFOMC-2894-CS-QCBS / Flood Mitigation Infrastructu Selección basada Plan de monitoreo y operació IBRD / 86280 Posterior Open - National 400,000.00 0.00 Cancelado 2016-08-15 2016-09-05 2016-10-19 2016-11-16 2016-12-16 2017-01-20 2017-02-24 2018-02-24 re en calidad y costo n de aguas pluviales Page 3 AR-UFOMC-2876-CS-LCS / Au Selección basada IBRD / 86280 Project Management Posterior Open - National 55,000.00 0.00 Cancelado 2021-04-01 2022-05-19 2021-04-22 2021-06-05 2021-07-03 2021-08-02 2021-09-06 2021-10-11 2022-04-09 ditoría 21-22 en el menor costo AR-UFOMC-122561-CS-QCBS / ELABORACIÓN DEL PROYEC TO EJECUTIVO DEL TÚNEL ALI Selección basada Open - Internationa VIADOR DEL ARROYO MEDRA IBRD / 86280 Project Management Previa 3,000,000.00 0.00 En ejecución 2019-07-22 2019-08-12 2019-09-25 2019-10-23 2019-11-22 2019-12-27 2020-01-31 2021-01-30 en calidad y costo l NO, ESTUDIOS Y OBRAS COM PLEMENTARIAS -PLANIFICACI ÓN DE MEDIDAS NO ESTRUC TURALES AR-UFOMC-115141-CS-LCS / Selección basada IBRD / 86280 Project Management Posterior Open - National 50,000.00 6,298.88 Firmado 2019-11-01 2021-03-18 2019-11-22 2021-06-15 2020-01-05 2021-06-15 2020-02-02 2021-06-15 2020-03-03 2021-06-15 2020-04-07 2021-06-15 2020-05-12 2021-06-15 2020-11-08 Auditoría Financiera 2019-20 en el menor costo AR-UFOMC-171493-CS-QCBS / Elaboración de la Ingeniería del Colector Baja Costanera: Selección basada Open - Internationa IBRD / 86280 Project Management Previa 2,000,000.00 920,273.16 Firmado 2020-04-29 2020-05-05 2020-05-20 2020-05-05 2020-07-03 2020-06-29 2020-07-31 2020-07-27 2020-08-30 2020-08-27 2020-10-04 2020-11-19 2020-11-08 2020-12-11 2021-11-08 Anteproyecto de la traza Bor en calidad y costo l ges - Dock Sud y Proyecto Ej ecutivo del tramo Costa Salg uero -  Dock Sud" AR-UFOMC-171494-CS-QCBS / “ELABORACIÓN DEL INFOR ME DE IMPACTO AMBIENTAL Selección basada IBRD / 86280 Project Management Posterior Open - National 500,000.00 268,432.37 Firmado 2020-04-29 2020-05-11 2020-05-20 2020-05-11 2020-07-03 2020-06-08 2020-07-31 2020-08-06 2020-08-30 2020-09-03 2020-10-04 2020-12-16 2020-11-08 2020-12-21 2021-11-08 Y SOCIAL PARA EL PROYECTO en calidad y costo EJECUTIVO Y OBRA DEL COLE CTOR BAJA COSTANERA – Tra mo Costa Salguero – Dock Su d” AR-UFOMC-115140-CS-LCS / Institutional Development fo Selección basada IBRD / 86280 Posterior Open - National 200,000.00 0.00 Cancelado 2020-03-30 2020-04-20 2020-06-03 2020-07-01 2020-07-31 2020-09-04 2020-10-09 2021-04-07 Plan de Educación Etapa II r Flood Risk Management en el menor costo AR-UFOMC-2888-CS-QCBS / Selección basada IBRD / 86280 Project Management Posterior Open - National 50,000.00 0.00 Cancelado 2019-11-29 2019-12-20 2020-02-02 2020-03-01 2020-03-31 2020-05-05 2020-06-09 2021-06-09 Evaluación de medio término en calidad y costo AR-UFOMC-115123-CS-LCS / Institutional Development fo Selección basada IBRD / 86280 Posterior Open - National 150,000.00 0.00 Cancelado 2021-03-30 2021-04-20 2021-06-03 2021-07-01 2021-07-31 2021-09-04 2021-10-09 2022-04-07 Plan de Comunicación Etapa r Flood Risk Management en el menor costo IV AR-UFOMC-115122-CS-LCS / Institutional Development fo Selección basada IBRD / 86280 Posterior Open - National 165,000.00 0.00 Cancelado 2020-03-30 2021-05-28 2020-04-20 2020-06-03 2020-07-01 2020-07-31 2020-09-04 2020-10-09 2021-04-07 Plan de Comunicación Etapa r Flood Risk Management en el menor costo III AR-UFOMC-241305-CS-LCS / ELABORACION ESTUDIO DE I Selección basada IBRD / 86280 Project Management Posterior Open - National 100,000.00 27,576.93 Firmado 2021-06-30 2021-08-20 2021-07-21 2021-08-25 2021-09-03 2021-09-15 2021-10-01 2021-10-04 2021-10-31 2021-10-04 2021-12-05 2021-10-19 2022-01-09 2021-10-25 2022-07-08 MPACTO AMBIENTAL Y SOCIA en el menor costo L APERTURA DE ARROYOS -P ARQUE SAAVEDRA AR-UFOMC-239897-NC-RFQ / EDUCACION 2: ESTRATEGIAS Institutional Development fo Selección basada DE CONTENIDO DIGITAL - PR IBRD / 86280 Posterior Open - National 100,000.00 0.00 Cancelado 2021-06-28 2021-08-18 2021-07-05 2021-08-23 2021-09-01 2021-09-29 2021-10-29 2021-12-03 2022-01-07 2022-07-06 r Flood Risk Management en el menor costo OGRAMA CIUDADANIA GLOB AL - ESCUELAS SECUNDARIA S AR-UFOMC-276211-CS-QCBS / ELABORACIÓN DEL INFORM Selección basada Ejecución pendien IBRD / 86280 Project Management Posterior Open - National 100,000.00 0.00 2022-05-02 2022-05-23 2022-07-06 2022-08-03 2022-09-02 2022-10-07 2022-11-11 2023-11-11 E DE IMPACTO AMBIENTAL Y en calidad y costo te SOCIAL ARTEH PARQUE SAR MIENTO AR-UFOMC-300964-CS-QCBS / SERVICIO DE CONSULTORÍA PARA LA ELABORACIÓN DEL I Institutional Development fo Selección basada NFORME DE IMPACTO AMBIE IBRD / 86280 Posterior Open - National 40,000.00 0.00 En ejecución 2022-06-22 2022-09-01 2022-07-13 2022-11-25 2022-08-26 2022-12-30 2022-09-23 2023-01-19 2022-10-23 2023-02-07 2022-11-27 2023-03-30 2023-01-01 2024-01-01 r Flood Risk Management en calidad y costo NTAL Y SOCIAL "MEJORA EFIC IENCIA HIDRÁULICA Y CONTR OL DE LA DESEMBOCADURA DEL A° MEDRANO" AR-UFOMC-300963-CS-QCBS / SERVICIO DE CONSULTORÍA Institutional Development fo Selección basada PARA LA ELABORACIÓN DEL I IBRD / 86280 Posterior Open - National 40,000.00 0.00 En ejecución 2022-06-22 2022-09-01 2022-07-13 2022-11-25 2022-08-26 2022-12-29 2022-09-23 2023-01-19 2022-10-23 2022-11-27 2023-01-01 2024-01-01 r Flood Risk Management en calidad y costo NFORME DE IMPACTO AMBIE NTAL Y SOCIAL "RAMAL LARR ALDE-CIUDAD DE LA PAZ" AR-UFOMC-308583-CS-QCBS / SERVICIO DE CONSULTORÍA Selección basada PARA LA EMPLEMENTACIÓN IBRD / 86280 Project Management Posterior Open - National 98,000.00 0.00 En ejecución 2022-08-12 2022-08-16 2022-09-02 2022-09-05 2022-10-16 2022-09-13 2022-11-13 2022-10-31 2022-12-13 2022-11-18 2023-01-17 2022-12-02 2023-02-21 2024-02-21 en calidad y costo DE TALLERES SOCIALES PAR A LA GESTIÓN DEL RIESGO HÍ DRICO AR-UFOMC-319792-CS-QCBS / SERVICIO DE CONSULTORÍA PARA EL “PROYECTO EJECUTI Selección basada IBRD / 86280 Project Management Previa Open - National 2,500,000.00 0.00 En ejecución 2022-10-10 2022-10-06 2022-10-31 2022-12-14 2022-12-26 2023-01-11 2023-01-23 2023-02-10 2023-02-27 2023-03-17 2023-04-21 2024-04-20 VO DEL TUNEL ALIVIADOR DE en calidad y costo L ARROYO MEDRANO TRAMO S I Y II, Y OBRAS COMPLEMEN TARIAS” AR-UFOMC-322419-CS-QCBS / SERVICIO DE CONSULTORÍA PARA LA ELABORACIÓN DEL Selección basada IBRD / 86280 Project Management Posterior Open - National 1,000,000.00 0.00 En ejecución 2022-10-21 2022-10-20 2022-11-11 2022-12-25 2022-12-23 2023-01-22 2023-01-23 2023-02-21 2023-03-07 2023-03-28 2023-05-02 2024-05-01 PLAN DE ORDENAMIENTO HI en calidad y costo DRÁULICO DE LAS CUENCAS ALTAS DE LOS ARROYOS MAL DONADO Y CILDAÑEZ AR-UFOMC-324875-CS-LCS / Institutional Development fo Selección basada Ejecución pendien IBRD / 86280 Posterior Open - National 20,000.00 0.00 2022-12-31 2023-01-21 2023-03-06 2023-04-03 2023-05-03 2023-06-07 2023-07-12 2024-01-08 AUDITORÍA 2022-2023 r Flood Risk Management en el menor costo te AR-UFOMC-328653-CS-QCBS Selección basada / Relevamiento Estructural e IBRD / 86280 Project Management Posterior Open - National 1,000,000.00 0.00 En ejecución 2022-11-28 2022-11-28 2022-11-30 2023-01-11 2023-01-26 2023-02-08 2023-03-01 2023-02-15 2023-02-26 2023-03-18 2023-11-13 en calidad y costo Hidráulico del Arroyo Cildáñe z AR-UFOMC-334050-CS-QCBS / SERVICIO DE CONSULTORÍA ELABORACIÓN DEL INFORME Selección basada IBRD / 86280 Project Management Posterior Open - National 128,000.00 0.00 En ejecución 2023-01-02 2023-03-20 2023-01-23 2023-03-08 2023-04-05 2023-05-05 2023-06-09 2023-07-14 2024-07-13 DE IMPACTO AMBIENTAL Y S en calidad y costo OCIAL “TÚNEL ALIVIADOR DEL ARR OYO MEDRANO” AR-UFOMC-343010-CS-QCBS / “SERVICIO DE CONSULTORÍ A PARA LA ELABORACIÓN DE SECUENCIAS DIDÁCTICAS, S Selección basada IBRD / 86280 Project Management Posterior Open - National 124,000.00 0.00 En ejecución 2023-02-15 2023-02-22 2023-03-08 2023-04-21 2023-05-19 2023-06-18 2023-07-23 2023-08-27 2024-08-26 OPORTE GRÁFICO Y DIGITAL en calidad y costo DE LOS CONTENIDOS EDUCA TIVOS PARA LA GESTIÓN DEL RIESGO DE INUNDACIONES – ETAPA 3” Page 4 INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual AR-UFOMC-20568-CS-INDV / Institutional Development fo Fortalecimiento del Programa IBRD / 86280 Posterior Individual Open 10,000.00 0.00 Cancelado 2017-01-15 2017-03-05 2017-03-26 2017-04-30 2017-10-27 r Flood Risk Management Primeros Respondedores AR-UFOMC-2879-CS-INDV / C ontratación de consultores p/ Institutional Development fo IBRD / 86280 Posterior Individual Open 65,000.00 0.00 Cancelado 2017-01-15 2017-03-05 2017-03-26 2017-04-30 2017-10-27 talleres de concientización a r Flood Risk Management los profesionales del rubro. AR-UFOMC-2878-CS-INDV / C ontratación de consultores p/ Institutional Development fo IBRD / 86280 Posterior Individual Open 65,000.00 0.00 Cancelado 2017-01-15 2017-03-05 2017-03-26 2017-04-30 2017-10-27 talleres de concientización a r Flood Risk Management la sociedad civil AR-UFOMC-2883-CS-INDV / C Institutional Development fo IBRD / 86280 Previa Individual Open - National 1,920,000.00 0.00 Cancelado 2016-01-02 2016-02-20 2016-03-12 2016-04-16 2016-10-13 onsultorías varias Contratado r Flood Risk Management s F22 Page 5