The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) Green National Highways Corridor Project (P167350) SOUTH ASIA | India | Transport Global Practice | IBRD/IDA | Investment Project Financing | FY 2020 | Seq No: 5 | ARCHIVED on 29-Aug-2022 | ISR52613 | Implementing Agencies: India, Ministry of Road Transport and Highways Key Dates Key Project Dates Bank Approval Date: 27-Mar-2020 Effectiveness Date: 10-Feb-2021 Planned Mid Term Review Date: 20-Nov-2023 Actual Mid-Term Review Date: Original Closing Date: 18-Mar-2025 Revised Closing Date: 18-Mar-2025 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project Development Objective is to demonstrate safe and green National Highway corridors in selected States and enhance the institutional capacity of the Ministry of Road Transport and Highways in mainstreaming safety and green technologies. Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Road Improvement and Maintenance - IPF:(Cost $165.00 M) Institutional Development - IPF:(Cost $13.65 M) Road Safety - IPF:(Cost $0.09 M) Green Highway Corridor Improvement and Maintenance:(Cost $1001.00 M) Institutional Capacity Enhancement:(Cost $39.50 M) Road Safety:(Cost $69.00 M) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Substantial Substantial Implementation Status and Key Decisions The Project was approved by the Board of the World Bank on March 27, 2020. The restructuring that will support the completion of balance activities from the National Highway Interconnectivity project, was approved in July 2022. The procurement for civil works and consultancy services for Phase I roads in Andhra Pradesh, Himachal Pradesh and Rajasthan is completed. The procurement of the roads under Phase II of the Project in Andhra Pradesh, Himachal Pradesh and Uttar Pradesh is well advanced. Works are underway on eleven contracts, with a combined equivalent progress of 95.8 km of completed road sections. On the Institutional Capacity Enhancement and Road Safety Components, GoI has recently published for public comment the draft rules for the National Road Safety Board. Development, training and roll-out of the Integrated Road Accident Database is continuing. 8/29/2022 Page 1 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Low Low Low Macroeconomic Low Substantial Substantial Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Substantial High High Institutional Capacity for Implementation and Substantial High High Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Substantial Substantial High Stakeholders Moderate Substantial Substantial Other -- Moderate Moderate Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes Demonstrate green National Highway corridors in selected states IN01176709 ►Natural resource efficiency gains in construction of project highways (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Natural resource efficiency aspects incorporated in design Value Usage not systematic Usage not systematic Usage not systematic and construction of 783 km of project highways Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-Mar-2025 This indicator attempts to capture the extent of savings in use of scarce natural materials in construction Comments: and maintenance of highways by incorporating appropriate pavement designs IN01176764 ►Reduced carbon emissions in construction of project highways (Percentage, Custom) 8/29/2022 Page 2 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 25.00 Date 19-Mar-2020 15-Jun-2020 15-Jun-2020 18-Mar-2025 This indicator seeks to measure the extent to which GHG emissions are reduced in construction of project Comments: highways IN01176765 ►Reduced Vehicle Operating Costs on project highways (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Trucks VOC is Rs. 20 Trucks VOC is Rs. 20 per Trucks VOC is Rs. 20 Trucks VOC is less Value per km km per km than Rs. 20 per km Date 19-Mar-2020 15-Jun-2020 15-Jun-2020 18-Mar-2025 Comments: This indicator seeks to measure reduction in vehicle operating costs of trucks in project highways Demonstrate safe National Highway corridors in selected states IN01176710 ►Reduction of fatalities on project highways (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 2019 baseline data - to 2019 baseline data being 2019 baseline data No increase in Value be collected collected being collected fatalities Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-Mar-2025 Comments: This indicator seeks to measure the effectiveness of road safety interventions on project roads Enhance the institutional capacity of MoRTH in mainstreaming safety and green technologies IN01176761 ►Safety and green highway technologies applied on 2,500 km of non-project highways (Kilometers, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2,000.00 Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-Mar-2025 Comments: This indicator measures mainstreaming of green technologies in design and construction of highways IN01176762 ►Green National Highways Policy and Guidelines developed and implemented (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Policy developed and Value Policy to be developed Policy to be developed Policy to be developed implemented Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-May-2022 8/29/2022 Page 3 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) This indicator measures capacity enhancement in mainstreaming of green technologies through policy Comments: development and implementation. IN01176763 ►National Highways Climate Adaptation Policy and guidelines developed and implemented (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Policy developed and Value Policy to be developed Policy to be developed Policy to be developed implemented Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-May-2022 This indicator measures capacity enhancement in mainstreaming of climate resilience through policy Comments: development and implementation. Intermediate Results Indicators by Components Component A: Green Highway Corridor Improvement and Maintenance IN01176767 ►Length of project National Highways developed incorporating green technologies (Kilometers, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 783.00 Date 19-Mar-2020 15-Jun-2020 15-Jun-2020 18-Mar-2025 This indicator seeks to measure the length of National Highways constructed incorporating green Comments: technologies and demonstrating resource efficiency, climate resilience, and safety aspects IN01176769 ►Climate resilience aspects incorporated in construction of project highways (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 783.00 Date 19-Mar-2020 15-Jun-2020 15-Jun-2020 18-Mar-2025 This indicator seeks to measure the length of project highways constructed incorporating climate Comments: resilience aspects IN01176772 ►Length of project highways constructed incorporating bio-engineering solutions (Kilometers, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 150.00 Date 19-Mar-2020 15-Jun-2020 15-Jun-2020 18-Mar-2025 Comments: Bio-engineering solutions applied in the project highways IN01176775 ►Roads constructed (Kilometers, Corporate) Baseline Actual (Previous) Actual (Current) End Target 8/29/2022 Page 4 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) Value 0.00 66.60 66.60 783.00 Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-Mar-2025 IN01176777 Roads constructed - rural (Kilometers, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 0.00 IN01176779 Roads constructed - non-rural (Kilometers, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 66.60 66.60 938.00 IN01176780 ►Beneficiaries of job-focused interventions (Number, Corporate) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,000.00 Date 19-Mar-2020 15-Jun-2020 15-Jun-2020 18-Mar-2025 IN01176781 Beneficiaries of job-focused interventions - Female (Number, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 500.00 IN01176782 ►Grievances filed through project GRM are properly tracked and receive satisfactory responses (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 90.00 Date 30-Mar-2020 15-Jun-2020 15-Jun-2020 31-Mar-2025 The indicator measures the percentage of grievances satisfactorily dealt that are lodged with the Comments: Grievance Redressal Management system strengthened under the project IN01176783 ►Increase in road user satisfaction (on a scale of 0 to 5) (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Baseline data not yet Baseline data not yet Baseline data not yet Increase in road user Value available available available satisfaction Date 27-Jan-2020 15-Jun-2020 15-Jun-2020 18-Mar-2025 This indicator seeks to measure the increase/decrease in level of satisfaction of the road users during and Comments: after completion of construction of project highways. Component B: Institutional Capacity Enhancement 8/29/2022 Page 5 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) IN01176770 ►Development and implementation of guidelines and model documents for mainstreaming safety and green technologies (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Draft ToRs for Template ToRs for Draft ToRs for supervision, and design and supervision supervision, and updated updated draft bid EPC Template ToRs for of construction, bidding draft bid EPC documents documents design, supervision, bid documents and project incorporating safety, incorporating safety, documents for management process resilience and green resilience and green Value incorporating safety, of the EPC contracts technologies are now technologies are now resilience and green incorporating safety, available and in use, and available and in use, technologies not resilience, and green will be further updated and will be further available technologies based on implementation updated based on developed and experience. implementation implemented experience. Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 04-Jan-2022 This indicator seeks to measure the mainstreaming of safety and green technologies through Comments: development and implementation of model documents and guidelines IN01176773 ►Development and implementation of policy for reducing emissions from transport services (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Workplan for Workplan for preparation preparation of policy to Policy to reduce of policy to reduce reduce vehicular vehicular emissions Value None vehicular emissions emissions under developed and under discussion with discussion with implemented. MoRTH. MoRTH. Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 14-Jun-2022 This indicator seeks to measure whether policy to reduce vehicular emission have been developed and Comments: implemented, which would in turn help in promoting green highways by reducing vehicular emissions. IN01176776 ►Development of physical and digital freight management systems' models (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Workplan for Workplan for development of development of physical physical and digital Appropriate models and digital freight Value No models in place freight management designed and management systems systems models under platforms developed models under discussion discussion with with MoRTH. MoRTH. Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 14-Jun-2023 This indicator seeks to improve freight flows through development of suitable models Comments: IN01176778 ►Percentage of women engaged as staff in Highway Safety Work force (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 8/29/2022 Page 6 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) Date 18-Mar-2020 15-Jun-2020 15-Jun-2020 30-Jun-2025 The indicator seeks to measure percentage of women employed in the Highway safety work force in Comments: implementation of National Highway Safety System and Traffic Aid posts in the Project. Component C: Road Safety IN01176766 ►Strengthening safety enforcement and emergency response along the project highways (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Highway safety enforcement and emergency response Value None None None facilities (Traffic Aid Posts) established at fourteen locations on the project highways. Date 19-Mar-2020 15-Jun-2020 15-Jun-2020 18-Mar-2025 This indicator seeks to measure the extent to which highway safety and emergency response facilities Comments: have been established, thus reducing fatalities and road crash incidences. IN01176768 ►Improved road safety data analytics (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Collection of crash Collection of crash data data using the using the Integrated Integrated Road Road Accident Database Roll out of the The Integrated Road Accident Database Management System is Integrated Road Accident Database Management System Value now underway in 12 Accident Database Management System is is now underway in 12 states, with staffing Management System being developed states, with staffing deployment completed in in 5 states deployment completed 21 states. Training is in 21 states. Training ongoing. is ongoing. Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-Mar-2025 Comments: This indicator seeks to systematically analyse road accident data and support decision making IN01176771 ►Enhanced capacity and support to National Road Safety Board (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Establishment of Establishment of National National Road Safety The National Transport Road Safety Board Support provided to Board notified on 3 Value Safety Board is to be notified on 3 September the National Transport September 2021 but formed 2021 but but not yet fully Safety Board but not yet fully operational. operational. Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-Mar-2025 Comments: This indicator seeks to enhance the operational effectiveness of the National Transport Safety Board IN01176774 8/29/2022 Page 7 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) ►National Highway Safety System implemented (Text, Custom, PBC) Baseline Actual (Previous) Actual (Current) End Target Responsibility for Responsibility for National Highway National Highway Safety implementation implementation National Safety System Value System is being National Highway Highway Safety System implemented in 1,200 designed Safety System assigned to NHAI. km of highways assigned to NHAI. Date 19-Mar-2020 04-Apr-2022 04-Apr-2022 18-Mar-2025 Comments: This indicator seeks implementation of road safety enforcement on highways Performance-Based Conditions IN01176784 ►PBC 1 Length of project National Highways developed incorporating green technologies (Kilometers, Output, 170.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Value 0.00 0.00 0.00 783.00 Date -- 15-Jun-2020 15-Jun-2020 -- IN01176785 ►PBC 2 Updated design and contract documents for construction and maintenance of highways developed and mainstreamed (Text, Outcome, 12.19, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Contract documents Contract documents for Contract documents for Contract documents for for implementation implementation of safety implementation of safety implementation of safety of safety and green and green technologies Value and green technologies in and green technologies in technologies in design and design and construction of design and construction of developed, construction of highways highways not available highways not available approved and not available mainstreamed Date -- 15-Jun-2020 15-Jun-2020 -- IN01176786 ►PBC 3 Length of project highways constructed incorporating bio-engineering solutions (Kilometers, Output, 25.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Value 0.00 0.00 0.00 150.00 8/29/2022 Page 8 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) Date -- 15-Jun-2020 15-Jun-2020 -- IN01176787 ►PBC 4 National Highways Climate Adaptation Policy and guidelines developed and implemented (Text, Output, 25.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Value Policy to be developed Policy to be developed Policy to be developed Policy enacted Date -- 04-Apr-2022 04-Apr-2022 -- IN01176788 ►PBC 5 Green National Highways Policy and Guidelines developed and implemented (Text, Output, 25.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Value Policy to be developed Policy to be developed Policy to be developed Policy enacted Date -- 04-Apr-2022 04-Apr-2022 -- IN01176789 ►PBC 6 Development and implementation of policy for reducing emissions from transport services (Text, Output, 20.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Policy to reduce Policy to reduce vehicular vehicular emissions Value None emissions developed and Policy enacted developed and implemented. implemented. Date -- 04-Apr-2022 04-Apr-2022 -- IN01176790 ►PBC 7 Development of physical and digital freight management systems' models (Text, Output, 10.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Workplan for Workplan for development development of physical of physical and digital and digital freight Value No models in place freight management Models developed management systems systems models under models under discussion discussion with MoRTH. with MoRTH. Date -- 04-Apr-2022 04-Apr-2022 -- 8/29/2022 Page 9 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) IN01176791 ►PBC 8 Improved road safety data analytics (Text, Output, 25.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Collection of crash data Collection of crash data using the Integrated using the Integrated Road Integrated Road The Integrated Road Road Accident Database Accident Database Accident Database Accident Database Management System is Value Management System is Management Management System is now underway in 9 now underway in 9 states, System is rolled-out being developed states, with roll-out with roll-out ongoing in a in 5 states ongoing in a further 9 further 9 states. states. Date -- 04-Apr-2022 04-Apr-2022 -- IN01176792 ►PBC 9 National Highway Safety System implemented (Text, Output, 15.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Bids received for Bids received for National Highway National Highway Safety implementation of pilot implementation of pilot for Value Safety System System is being designed for National Highway National Highway Safety implemented Safety System. System. Date -- 04-Apr-2022 04-Apr-2022 -- IN01176793 ►PBC 10 Safety and green highway technologies applied on 2,000 km of non-project highways (Kilometers, Outcome, 40.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Value 0.00 0.00 0.00 2,000.00 Date -- 04-Apr-2022 04-Apr-2022 -- IN01176794 ►PBC 11 Strengthening safety enforcement and emergency response along the project highways (Text, Output, 14.75, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 In place at 14 Value None None None locations Date -- 15-Jun-2020 15-Jun-2020 -- 8/29/2022 Page 10 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) IN01176795 ►PBC 12 Enhanced capacity and support to National Road Safety Board (Text, Output, 2.40, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Establishment of National Establishment of National Support provided to The National Transport Road Safety Board Road Safety Board National Road Value Safety Board is to be notified on 3 September notified on 3 September Safety Board and formed 2021 but but not yet fully 2021 but but not yet fully capacity developed operational. operational. Date -- 04-Apr-2022 04-Apr-2022 -- IN01176796 ►PBC 13 Training imparted in road safety (Number, Output, 4.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 Value 0.00 0.00 0.00 1,000.00 Date -- 15-Jun-2020 15-Jun-2020 -- IN01176797 ►PBC 14 An integrated ERP system implemented in MoRTH and its two implementing agencies (Text, Process, 15.00, 0.00%) Baseline Actual (Previous) Actual (Current) Year 5 ERP solution is being ERP solution is being ERP solution is being Value -- developed tested by business units tested by business units Date -- 15-Jun-2020 15-Jun-2020 -- Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P167350 IBRD-90620 Effective USD 500.00 500.00 0.00 8.56 491.44 1.7% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P167350 IBRD-90620 Effective 27-Mar-2020 22-Dec-2020 10-Feb-2021 18-Mar-2025 18-Mar-2025 8/29/2022 Page 11 of 12 The World Bank Implementation Status & Results Report Green National Highways Corridor Project (P167350) Cumulative Disbursements Restructuring History Level 2 Approved on 06-Jul-2022 Related Project(s) There are no related projects. 8/29/2022 Page 12 of 12