The World Bank                                                                                  Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)



Enhancing Shared Prosperity through Equitable Services (P151432)


 EASTERN AND SOUTHERN AFRICA | Ethiopia | Social Protection & Jobs Global Practice | Requesting Unit: AECE3 | Responsible Unit: HAES1
 IBRD/IDA | Program-for-Results Financing | FY 2016 | Team Leader(s): Yoseph Abdissa Deressa, Belay Addise Cheffik


 Seq No: 18 | ARCHIVED on 21-Mar-2024 | ISR59844 | Created by: Yoseph Abdissa Deressa on 01-Feb-2024 | Modified by: Mariam Denise Brain
 on 07-Mar-2024


 Program Development Objectives

  PDO Table
  Program Development Objective (from Program Appraisal Document)
  The objective of ESPES program is to improve equitable access to basic services and strengthen accountability systems at the decentralized
  level.

  The program aims to improve service delivery for the whole population of Ethiopia by improving results in health, education and agriculture
  services in the most poorly performing woredas and strengthening the overall decentralized service delivery system. Building on almost 10 years
  of support for basic services delivery, the ESPES focuses on leveraging the government’s broadprogram of service delivery support to promote
  equity, enhance quality of and access to services, and institutionalize critical systems for service delivery, especially at the woreda level.

 Overall Ratings

 Name                                                                      Previous Rating                          Current Rating

 Progress towards achievement of PDO                                       Satisfactory                            Satisfactory
 Overall Implementation Progress (IP)                                      Moderately Satisfactory                 Moderately Satisfactory


 Implementation Status and Key Decisions

  Program status: The ESPES Program has been operational since 2015 and two additional financings were approved in September 2017 and May
  2021. The total IDA financing to the GoE through ESPES is now US$1.55 billion until May 2024. The program in on track to achieve the program
  development objectives. Achievement and verification of results are progressing well. All the 40 Disbursement Linked Results (DLRs) of the 1st
  Additional Financing of ESPES (IDA Cr 6130-ET) were achieved and from the 2nd Additional Financing (IDA Cr 6883-ET), from the total 18 DLRs,
  16 DLRs were achieved; the remaining 2 DLRs are under verification. The mission stressed the need to speed-up the submission of the remaining
  DLRs. The implementation of ESPES-financed activities has been paused in certain conflict-affected areas of the country owing to security
  concerns and insufficient implementation capacity.



 Data on Financial Performance


 Disbursements (by loan)

 Project        Loan/Credit/TF    Status      Currency      Original    Revised     Cancelled     Disbursed      Undisbursed              % Disbursed


 P151432        IDA-57160         Closed      USD            600.00      600.00            0.00       597.66             5.92                       99%

 P151432        IDA-61310         Effective   USD            600.00      600.00            0.00       599.29             0.00                   100%

 P151432        IDA-68830         Effective   USD            250.00      250.00            0.00       200.44            33.30                       86%

 P151432        IDA-D2290         Effective   USD            100.00      100.00            0.00        98.61             0.48                   100%



3/21/2024                                                                                                                  Page 1 of 32
            The World Bank                                                                                      Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




 P151432        TF-A7523           Closed       USD                7.67        7.67           0.00           7.67             0.00                  100%

 P151432        TF-A9293           Effective    USD               24.28       24.28           0.00          19.10             5.18                   79%

 P151432        TF-B8723           Effective    USD                1.19        1.19           0.00           1.19             0.00                  100%


 Key Dates (by loan)

 Project         Loan/Credit/TF     Status      Approval Date      Signing Date       Effectiveness Date      Orig. Closing Date     Rev. Closing Date

 P151432         IDA-57160          Closed      15-Sep-2015        22-Oct-2015        11-Dec-2015             01-May-2019            31-May-2023
 P151432         IDA-61310          Effective   14-Sep-2017        29-Sep-2017        05-Feb-2018             31-May-2023            31-May-2024
 P151432         IDA-68830          Effective   20-May-2021        04-Jun-2021        27-Aug-2021             31-May-2024            31-May-2024
 P151432         IDA-D2290          Effective   14-Sep-2017        29-Sep-2017        05-Feb-2018             31-May-2023            31-May-2024
 P151432         TF-A7523           Closed      29-Aug-2018        29-Aug-2018        29-Aug-2018             31-May-2023            31-May-2023
 P151432         TF-A9293           Effective   10-Dec-2018        05-Apr-2019        05-Apr-2019             31-May-2023            31-May-2024
 P151432         TF-B8723           Effective   28-Jul-2022        29-Jul-2022        29-Jul-2022             31-May-2024            31-May-2024


 DLI Disbursement

                                                                                           Achievement       Disbursed amount in      Disbursement % for
 DLI ID       DLI Type       Description                  Coc              DLI Amount
                                                                                           Status            Coc                      DLI

 Loan: IDA57160-001

                             Per Capita Increas in
  1           Regular                                     XDR             64,725,000.00    Fully Achieved           64,724,999.93                  100 %
                             budget FG grant tr
                             Incrsd proption of qlfd
  2           Regular                                     XDR             21,575,000.00    Fully Achieved           21,574,999.96                  100 %
                             female agric dvp
                             Incrsd health extn wrks
  3           Regular                                     XDR             21,575,000.00    Fully Achieved           21,574,999.95                  100 %
                             grdtd on Lev 4
                             Incrs in total no. enrolled in
  4           Regular                                       XDR           43,150,000.00    Fully Achieved           43,149,998.89                  100 %
                             gd 5-8
                             Improved geo equity
  5a          Regular                                     XDR             43,150,000.00    Fully Achieved           43,149,999.95                  100 %
                             educ. and health
                             Improved wealth equity                                        Partially
  5b          Regular                                     XDR             21,575,000.00                             18,230,875.00                  85 %
                             educ. and health                                              Achieved
                             Improved Env and social                                       Partially
  6           Regular                                     XDR             35,958,334.00                             35,023,416.99                  97 %
                             mgmt capacity                                                 Achieved
                             Enhanced Tranparency
  7           Regular                                     XDR             57,533,333.00    Fully Achieved           57,533,332.93                  100 %
                             and accountability
                             Est. govt sys for
  8           Regular                                     XDR             33,081,666.00    Fully Achieved           33,081,665.93                  100 %
                             benchmarking PFM
                             Oversight fn of reg.
  9           Regular                                     XDR             11,506,667.00    Fully Achieved           11,506,666.99                  100 %
                             procurement regulat
                             Strengthened capacity
  10a         Regular                                     XDR             21,575,000.00    Fully Achieved           21,574,999.97                  100 %
                             respond to fraud



3/21/2024                                                                                                                      Page 2 of 32
            The World Bank                                                                           Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




                             Strengthened capacity fin.
  10b         Regular                                       XDR     12,945,000.00   Fully Achieved     12,944,999.99                 100 %
                             and budget

  11          Regular        Improv. dev. info and data     XDR     43,150,000.00   Fully Achieved     43,149,999.88                 100 %

 Loan: IDA61310-001

                             Per capita increase in
  1           Regular                                       XDR     64,976,000.00   Fully Achieved     64,975,999.96                 100 %
                             budgeted Fed Gov
                             Incr.proportion of qualified
  2           Regular                                       XDR     28,600,000.00   Fully Achieved     28,600,000.00                 100 %
                             female agri
                             # of health ext workers
  3a          Regular                                       XDR     21,600,000.00   Fully Achieved     21,600,000.01                 100 %
                             qualified to Lev
                             Incr. qualified teachers
  4a          Regular                                       XDR     21,600,000.00   Fully Achieved     21,599,999.93                 100 %
                             grade 1-4 diplo
                             Improved geographic                                    Partially
  5a          Regular                                       XDR     32,400,000.00                      32,399,999.90                 100 %
                             equity in educ & hea                                   Achieved
                             Improved env. and social                               Partially
  6           Regular                                       XDR     36,000,000.00                      36,000,000.00                 100 %
                             mgt capacity at                                        Achieved
                             Enhanced transparency                                  Partially
  7           Regular                                       XDR     82,312,000.00                      82,312,000.26                 100 %
                             and accountability                                     Achieved
                             Establishment of a gov.
  8           Regular                                       XDR     28,800,000.00   Fully Achieved     28,799,999.99                 100 %
                             sys. for benchma
                             Oversight function of Reg'l
  9           Regular                                       XDR     28,800,000.00   Fully Achieved     28,799,999.97                 100 %
                             proc. reg. b
                             Strengthened capacity of
  10b         Regular                                       XDR     10,800,000.00   Fully Achieved     10,800,000.00                 100 %
                             Woreda Council
                             Strengthened capacity of
  10c         Regular                                       XDR     18,000,000.00   Fully Achieved     18,000,000.00                 100 %
                             Woredas to effe
                                                                                    Partially
  12          Regular        Improve nutrition services     XDR     21,600,000.00                      21,599,999.98                 100 %
                                                                                    Achieved
                             Expand Adult&Non-Formal
  13          Regular                                XDR            10,612,000.00   Fully Achieved     10,612,000.00                 100 %
                             Education(ANFE)
                             Protect basic health
  14          Regular                                       XDR     17,600,000.00   Fully Achieved     17,600,000.00                 100 %
                             delivery through th
                             Improve Covergent deliv.
  15          Regular                                       XDR      7,300,000.00   Fully Achieved      7,300,000.00                 100 %
                             of services bet

 Loan: TFA7523-001

                             Penta 3 coverage for
  5a1         Regular                                       USD      2,283,238.00   Fully Achieved      2,283,238.00                 100 %
                             children < 1 in bot
                             At lst teachrs hve diploma
  4a1         Regular                                       USD      2,265,029.00   Fully Achieved      2,265,029.00                 100 %
                             lvel qlifcati
                             Oversight function of
  9           Regular                                       USD        521,207.00   Fully Achieved        521,207.00                 100 %
                             Regional Proc. Bod

  12          Regular        Improve Nutrition services     USD      2,599,793.00   Fully Achieved      2,599,793.00                 100 %

 Loan: IDA68830-001


3/21/2024                                                                                                          Page 3 of 32
            The World Bank                                                                                    Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




                             Protect gnl grant (GPG)
  1a          Regular                                    XDR          28,200,000.00      Fully Achieved         28,200,000.00                  100 %
                             trnsf basic sce
                             imp eqty edu,health,soc
  5c          Regular                                    XDR          35,300,000.00      Fully Achieved         35,300,000.00                  100 %
                             prot sce dlv out
                             improved environtl soc
  6           Regular                                    XDR          14,100,000.00      Fully Achieved         14,100,000.00                  100 %
                             mngmt capacit lev
                             enhanced transp accnt                                       Partially
  7           Regular                                    XDR          21,200,000.00                              7,100,000.00                  33 %
                             thru citiz engagmt                                          Achieved
                             Est gov syst bench                                          Partially
  8           Regular                                    XDR          10,600,000.00                              2,662,500.00                  25 %
                             Woreda(PFM)bench ratg                                       Achieved
                             Oversight func reg proc
  9           Regular                                    XDR          14,200,000.00      Fully Achieved         14,200,000.00                  100 %
                             bodies improved
                             Improved dev info data sce
  11          Regular                                   XDR            7,100,000.00      Fully Achieved          7,100,000.00                  100 %
                             delivery
                             Expand Adult Non-Form
  13          Regular                                    XDR          14,100,000.00      Fully Achieved         14,100,000.00                  100 %
                             Educ (ANFE) sce
                             Improve conv delivery sce                                   Partially
  15          Regular                                    XDR          14,100,000.00                             13,677,000.00                  97 %
                             better WaSH                                                 Achieved
                             Promote gender awrns
  16          Regular                                    XDR          17,600,000.00      Fully Achieved         17,600,000.00                  100 %
                             women empowermnt

 Loan: TFB8723-001

                             Expand Adult & non formal
  13          Regular                                  USD                595,455.00     Fully Achieved            595,455.00                  100 %
                             education serv
                             Promote gender
  16          Regular        awareness and women's       USD              595,455.00     Fully Achieved            595,455.00                  100 %
                             emp

 Program Action Plan

  Action Description              Undertake country wide study and understand cost of basic services at the national level

  Source                          DLI#                   Responsibility         Timing                    Timing Value             Status

  Technical                                              MoFEC                  Due Date                  31-Dec-2018              Completed

  Completion Measurement          Submission of the study

  Comments



  Action Description              Undertake a review of progress in FTA-SA linkage implementation

  Source                          DLI#                   Responsibility         Timing                    Timing Value             Status

                                                         Client                 Due Date                  31-Dec-2018              Completed

  Completion Measurement




3/21/2024                                                                                                                    Page 4 of 32
            The World Bank                                                                                     Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Comments



  Action Description              Customize, rollout, and implement simplified procurement directives and procedures in woredas

  Source                          DLI#                   Responsibility             Timing                Timing Value              Status

  Technical                                              Client                     Due Date              31-Oct-2023               Completed

  Completion Measurement          Directive issued

  Comments



                                  Decentralized resource allocation (a): Government hires local consultant to understand how regions allocate
  Action Description
                                  resources to Woredas, supported by TA from the World Bank

  Source                          DLI#                   Responsibility             Timing                Timing Value              Status

  Technical                                              MoFEC                      Due Date              30-Nov-2023               Completed

  Completion Measurement          Analytical report on regional budget allocation

  Comments



                                  Decentralized resource allocation (b): Organize fora/forum for sharing of experiences among the regions on their
  Action Description
                                  block grant system allocation mechanisms

  Source                          DLI#                   Responsibility             Timing                Timing Value              Status

  Technical                                              MoFEC/World Bank           Due Date              30-Apr-2024               In Progress

  Completion Measurement          Report

  Comments



                                  Decentralized resource allocation (c): c.         Take action, as needed, to ensure that Woreads has sufficient
  Action Description
                                  resources to delivery basic services.

  Source                          DLI#                   Responsibility             Timing                Timing Value              Status

                                                         MoFEC/Federation
  Technical                                                                         Due Date              30-Apr-2024               In Progress
                                                         Council

  Completion Measurement          Increased allocation figure

  Comments



                                  Undertake targeted social and behavioral change communication intervention to Kebeles and households in bottom
  Action Description
                                  20% of Woredas (list included in Technical Assessment) for improving health, education and nutrition outcomes



3/21/2024                                                                                                                     Page 5 of 32
            The World Bank                                                                                      Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Source                          DLI#                   Responsibility           Timing                   Timing Value                Status

  Technical                                              MoE                      Recurrent                Continuous                  In Progress

  Completion Measurement          Report

  Comments



                                  Pilot demand side activity helping households access education services (for example, school feeding, child grants
  Action Description
                                  for schooling, or conditional cash transfers) in bottom 20% of Woredas

  Source                          DLI#                   Responsibility           Timing                   Timing Value                Status

                                                         MoE/Region and
  Other                                                  Woreda Sector            Recurrent                Continuous                  Completed
                                                         Bureaus

  Completion Measurement          Report

  Comments                        The MoE is expending school feeding program throughout the country in collaboration with the regions.



                                  Strengthen sectoral collaboration for service delivery to better tackle intersectoral challenges at the federal and
  Action Description
                                  regional levels (supported by the SDS and informed by May 2017 JRIS findings)

  Source                          DLI#                   Responsibility           Timing                   Timing Value                Status

  Technical                                              MoFEC                    Recurrent                Continuous                  Completed

  Completion Measurement          Meeting reports

  Comments                        Comments           Sectoral task force meeting established and meeting bi-monthly to enhance sectoral collaboration.



                                  Undertake study on the constraints to Penta 3 vaccine coverage in bottom 20% of Woredas and propose actions for
  Action Description
                                  how to boost it

  Source                          DLI#                   Responsibility           Timing                   Timing Value                Status

  Technical                                              MoH                      Due Date                 30-Nov-2023                 Completed

  Completion Measurement          Report

  Comments                        The study on constraints to Penta 3 vaccine was competed



                                  Revise Integrated Refresher Training (IRT) modules for HEW and revise the PSNP frontline service provider training
  Action Description
                                  modules aligning with NNP2

  Source                          DLI#                   Responsibility           Timing                   Timing Value                Status

  Technical                                              MoH and MoARD            Due Date                 30-Nov-2023                 Completed

  Completion Measurement          Report from MoH



3/21/2024                                                                                                                       Page 6 of 32
            The World Bank                                                                                    Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Comments                        Revision of IRT module is completed, Federal Training of trainers (ToT) completed and rollout to regions is ongoing.



  Action Description              Introducing a system within UNIS in order to disaggregate nutrition data by PSNP household status

  Source                          DLI#                  Responsibility           Timing                 Timing Value               Status

  Technical                                             MoH                      Due Date               30-Nov-2023                In Progress

  Completion Measurement          Report

  Comments



  Action Description              Conduct training to Woreda level staff in Afar and Somali on collection of EMIS and HMIS data

  Source                          DLI#                  Responsibility           Timing                 Timing Value               Status

                                                        MoE/MoH                  Due Date               31-Dec-2019                Completed

  Completion Measurement

  Comments



  Action Description              Preparation of FTA guideline for the regional sector bureaus manual

  Source                          DLI#                  Responsibility           Timing                 Timing Value               Status

  Technical                                             MoFEC                    Due Date               31-Dec-2019                Completed

  Completion Measurement          Guideline dessimination

  Comments



                                  Conduct GRM training for at least one Woreda officer and one regional GRM officer in 9 regions and 2 city
  Action Description
                                  administrations

  Source                          DLI#                  Responsibility           Timing                 Timing Value               Status

  Other                                                 EIO                      Recurrent              Yearly                     Completed

  Completion Measurement          Number of trainees

                                  A total of 1805 GRM officers, Stockholders (Council, Woreda Administration), of which 1179 Male and 626 Female
  Comments
                                  and Judiciary) took part on GRM capacity building trainings.



                                  Strengthen coordination between basic service sectors and oversight bodies on environmental and social
  Action Description
                                  management: (b). Bi-annual meeting by environment and social oversight bodies organized by EFCCC.

  Source                          DLI#                  Responsibility           Timing                 Timing Value               Status



3/21/2024                                                                                                                    Page 7 of 32
            The World Bank                                                                                    Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Environmental and Social
                                                         EFCCC and MOF           Recurrent               Semi-Annually               Completed
  Systems

  Completion Measurement          Report

                                  Due to COVID -19 and budget constraints annual forum and bi-annual meeting not conducted. EFCCC to convene
  Comments
                                  the annual forum & bi-annual meeting and provide status update – by next JRIS



  Action Description              In each BoFED assign E&S management Channel One coordinator

  Source                          DLI#                   Responsibility          Timing                  Timing Value                Status

                                                         MoFEC/BoFED             Due Date                31-Dec-2018                 Completed

  Completion Measurement

  Comments



  Action Description              Customize the ESMS Operational Manual in five regions and the two city administrations

  Source                          DLI#                   Responsibility          Timing                  Timing Value                Status

                                                         MoFEC                   Due Date                31-Dec-2019                 Completed

  Completion Measurement

  Comments



                                  For repetitive internal control weaknesses, institute strong M&E system and take accountability measures to ensure
                                  that actions are taken;
  Action Description              For long outstanding Advances, track long outstanding balances and take action to resolve them;



  Source                          DLI#                   Responsibility          Timing                  Timing Value                Status

                                                         MoFEC and
  Technical                                                                      Recurrent               Yearly                      In Progress
                                                         BOFEDs

  Completion Measurement          Report

                                  As per EMCP’s explanation M& E system is established & appropriate action is being taken at all level.

  Comments                        As per COPCD ‘s field visit Internal auditors of regions are assigned to conduct post audit of the program costs.




  Action Description              Address system challenges that improve internal controls: a.       Finalize and rollout a payroll application software;

  Source                          DLI#                   Responsibility          Timing                  Timing Value                Status




3/21/2024                                                                                                                     Page 8 of 32
            The World Bank                                                                                      Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




                                                         MoFEC and
  Fiduciary Systems                                                               Recurrent                Yearly                   In Progress
                                                         BOFEDs

  Completion Measurement          Payroll application software

  Comments                        The IBEX payroll system development is completed and is ready for piloting



                                  Address system challenges that improve internal controls: b.         Make sure existing property management record
  Action Description              system is operational at local level. Find automation options including replication of existing efficient computer
                                  systems (if any).

  Source                          DLI#                   Responsibility           Timing                   Timing Value             Status

                                                         MoFEC and
  Fiduciary Systems                                                               Recurrent                Yearly                   In Progress
                                                         BOFEDs

  Completion Measurement          Report

  Comments                        EMCP planned to strengthen internal audit & to work on the property management



                                  Address system challenges that improve internal control: C. Improve websites of BoFEDs to improve disclosure to
  Action Description
                                  address PEFA concerns;

  Source                          DLI#                   Responsibility           Timing                   Timing Value             Status

                                                         MoFEC and
  Technical                                                                       Recurrent                Yearly                   In Progress
                                                         BOFEDs

  Completion Measurement          Report

  Comments                        ToR is under preparation to out-source / recruit qualified consultant.



  Action Description              Address system challenges that improve internal control: d) Sustain and manage IBEX system at woredas effectively.

  Source                          DLI#                   Responsibility           Timing                   Timing Value             Status

                                                         MoFEC and
  Technical                                                                       Recurrent                Yearly                   In Progress
                                                         BOFEDs

  Completion Measurement          Report

                                  IBEX is functioning in 983 woredas including newly established ones. It was learned that IBEX in addition to the 983
  Comments
                                  woredas IBEX is functional in 920 sector & branch offices and 100 zones.



  Action Description              Target reforms that address the internal audit challenge at decentralized level should be developed;

  Source                          DLI#                   Responsibility           Timing                   Timing Value             Status

  Fiduciary Systems                                      MoFEC/BoFED              Recurrent                Quarterly                In Progress

  Completion Measurement          Reform docment




3/21/2024                                                                                                                     Page 9 of 32
            The World Bank                                                                                     Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




                                  As per explanation from EMCP, M& E system is established & appropriate action is being taken at all level. As per
  Comments
                                  COPCD ‘s field visit, Internal auditors of regions are assigned to conduct post audit of the program costs.



  Action Description              Regions should fill vacant posts of internal auditors at local levels;

  Source                          DLI#                    Responsibility            Timing                 Timing Value            Status

  Technical                                               MoFEC/BoFED               Recurrent              Yearly                  In Progress

  Completion Measurement          Report

  Comments                        An ongoing activity



  Action Description              Build capacity of auditors on an ongoing basis through regular trainings

  Source                          DLI#                    Responsibility            Timing                 Timing Value            Status

                                                          MoFEC and
  Technical                                                                         Recurrent              Continuous              In Progress
                                                          BOFEDs

  Completion Measurement          Report

  Comments                        Training was given to internal auditors on ongoing basis.



                                  Customize procurement performance measurement guideline and start data collection in Gambella, Afar, B. Gumuz,
  Action Description
                                  Somali and Harari regions

  Source                          DLI#                    Responsibility            Timing                 Timing Value            Status

                                                          BoFEDs/ Regional
  Technical                                                                         Recurrent              Yearly                  In Progress
                                                          Regulatory Bodies

  Completion Measurement          Report

  Comments



                                  Provide TOT to REACCs by FEACC; REACCs conduct cascaded training to Woredas on record keeping and
  Action Description
                                  reporting of F&C cases

  Source                          DLI#                    Responsibility            Timing                 Timing Value            Status

  Other                                                   FEACC                     Recurrent              Yearly                  Completed

  Completion Measurement          Report

  Comments



  Action Description              Inform the public through mass media (Regional) on compliant handling procedures




3/21/2024                                                                                                                   Page 10 of 32
            The World Bank                                                                                    Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Source                          DLI#                   Responsibility          Timing                  Timing Value               Status

                                                         FEACC and
  Other                                                                          Recurrent               Yearly                     In Progress
                                                         REACCs

  Completion Measurement          Report

  Comments                        EIO is using airtime to create awareness to the public about GRM system



                                  At least 60% of the woredas in regions maintained internal audit department/unit with at least 85% of approved
  Action Description
                                  internal audit positions filled

  Source                          DLI#                   Responsibility          Timing                  Timing Value               Status

  Fiduciary Systems               DLI 14                 MOF/BOFEDs              Recurrent               Yearly                     In Progress

  Completion Measurement          Reports

  Comments



                                  PFM: (i) MoF and regions create action plans and take actions to address PEFA 2018 low scores in various aspects
  Action Description
                                  of PFM system

  Source                          DLI#                   Responsibility          Timing                  Timing Value               Status

  Fiduciary Systems               DLI 36                 MoF/EMCP                Due Date                30-Apr-2024                In Progress

  Completion Measurement          Report

  Comments



                                  PFM: (ii) At least 60% of the woredas in regions maintained internal audit department/unit with at least 85% of
  Action Description
                                  approved internal audit positions filled

  Source                          DLI#                   Responsibility          Timing                  Timing Value               Status

  Fiduciary Systems               DLI 35                 BoFEDs and MoF          Recurrent               Yearly                     In Progress

  Completion Measurement          Report

  Comments



                                  PFM: (iii) All regional BoFEDs and ORAGs make functional their websites and disclose budget, budget execution and
  Action Description
                                  audit reports and other important resources to enhance fiscal transparency

  Source                          DLI#                   Responsibility          Timing                  Timing Value               Status

                                  DLI 10                 BOFEDS and
  Fiduciary Systems                                                              Due Date                30-Nov-2023                In Progress
                                                         ORAGs

  Completion Measurement          Report




3/21/2024                                                                                                                   Page 11 of 32
            The World Bank                                                                                  Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Comments



                                  Procurement: With technical assistance from FPPPA BoFEDs prepare revised draft regional procurement laws based
  Action Description
                                  on the newly revised federal law

  Source                          DLI#                  Responsibility          Timing                 Timing Value              Status

                                  DLI 17                FPPPA and
  Fiduciary Systems                                                             Due Date               30-Nov-2023               In Progress
                                                        BOFEDs

  Completion Measurement          Report

  Comments



                                  Governance: FEACC providing a cascaded training on record keeping and reporting of F&C to REACC and WoFED
  Action Description
                                  ethics officers from at least the 100 woredas that received computers through the program

  Source                          DLI#                  Responsibility          Timing                 Timing Value              Status

                                  DLI 23                FEACC, REACC
  Fiduciary Systems                                                             Due Date               30-Nov-2023               In Progress
                                                        and WOFEDs

  Completion Measurement          Report

  Comments



                                  Environmental and Social Safeguards: Strengthen the Social Accountability Unit in COPCD with full time safeguards
  Action Description
                                  specialist

  Source                          DLI#                  Responsibility          Timing                 Timing Value              Status

  Environmental and Social        DLI 8
                                                        MoF                     Due Date               30-Apr-2024               In Progress
  Systems

  Completion Measurement          Report

  Comments



                                  Gender Based Violence: MoH conducts cascaded training for GBV training of trainers to reach health professionals in
  Action Description
                                  all ten regions including special considerations as needed for low land regions.

  Source                          DLI#                  Responsibility          Timing                 Timing Value              Status

  Technical                       DLI 44                MoH                     Due Date               30-Apr-2024               In Progress

  Completion Measurement          Report

  Comments




3/21/2024                                                                                                                Page 12 of 32
            The World Bank                                                                                 Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Risks


 Systematic Operations Risk-rating Tool


  Risk Category                                             Rating at Approval          Previous Rating                Current Rating

  Political and Governance                                  --                          High                          High
  Macroeconomic                                             --                          Substantial                   Substantial
  Sector Strategies and Policies                            --                          Low                           Low
  Technical Design of Project or Program                    Moderate                   Moderate                      Moderate
  Institutional Capacity for Implementation and
                                                            --                          Moderate                      Moderate
  Sustainability
  Fiduciary                                                 Substantial                Substantial                   Substantial
  Environment and Social                                    Moderate                   Substantial                   Substantial
  Stakeholders                                              --                          Moderate                      Moderate
  Other                                                     --                          --                             --
  Overall                                                   Substantial                Substantial                   Substantial




  Results


 PDO Indicators by Objectives / Outcomes


  Ensuring Equitable Acess to basic Servces
   IN01399220
    ►Improved Net Enrollment Rate for grades 5–8 in bottom 20% Woredas (Percentage, Custom)

                                       Baseline                  Actual (Previous)           Actual (Current)          End Target

    Value                              17.30                     28.00                       28.00                     28.30

    Date                               22-Aug-2017               31-Aug-2021                 31-Aug-2021              30-Nov-2020

    Comments
    IN01399248
    ►Increased grade 8 completion rates for girls in bottom 20% of Woredas (New) (Percentage, Custom)

                                       Baseline                  Actual (Previous)           Actual (Current)          End Target

    Value                              12.50                     23.00                       23.00                     20.50

    Date                               22-Aug-2017               31-Aug-2021                 31-Aug-2021              30-Nov-2020

    Comments
    IN01399251
    ►Improved geographic equity in Penta 3 outcomes in bottom 20% Woredas (Percentage, Custom)

                                       Baseline                  Actual (Previous)           Actual (Current)          End Target



3/21/2024                                                                                                               Page 13 of 32
            The World Bank                                                                                 Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Value                              56.40                     63.50                      63.50                      62.40

    Date                               14-Sep-2017               31-Aug-2021                31-Aug-2021               30-Apr-2024

    Comments
    IN01399254
    ►Births attended by a skilled birth attendant (New) (Percentage, Custom)

                                       Baseline                  Actual (Previous)          Actual (Current)           End Target

    Value                              72.00                     62.00                      62.00                      95.00

    Date                               14-Sep-2017               21-Aug-2023                20-Feb-2024               30-Apr-2024

    Comments
    IN01399257
    ►Increased number of female-headed rural households accessing improved agricultural extension service (Number, Custom)

                                       Baseline                  Actual (Previous)          Actual (Current)           End Target

    Value                              4,253,000.00              5,141,000.00               5,141,000.00               5,325,000.00

    Date                               14-Sep-2017               21-Aug-2023                21-Aug-2023               30-Apr-2024

    Comments
    IN01399258
    ►58% of mothers with children aged 0-23 months (PSNP households only) living in PSNP Woredas in Highl (Text, Custom)

                                       Baseline                  Actual (Previous)          Actual (Current)           End Target
                                                                 Data not yet available     Data not yet available
    Value                              33.00                     from MoE related to        from MoE related to        58.00
                                                                 2018/19 performance        2018/19 performance
    Date                               29-Jan-2016               30-Nov-2023                20-Feb-2024               30-Apr-2024

    Comments
    IN01399259
    ►Per capita increase in budgeted federal government block grant transfers to regions, excluding Addis Ababa (Number, Custom)

                                       Baseline                  Actual (Previous)          Actual (Current)           End Target

    Value                              1,240.00                  1,712.00                   1,712.00                   1,696.00

    Date                               14-Sep-2017               31-Aug-2021                20-Feb-2024               30-Nov-2020

    Comments
    IN01399260
    ►Increased number of adults participated in the adult non-formal education program – disaggregated by regions and gender (Text, Custom)

                                       Baseline                  Actual (Previous)          Actual (Current)           End Target

    Value                              2.87 Million              2.87 Million               2.87 Million               3.2 Million

    Date                               31-Jul-2020               31-Aug-2021                20-Feb-2024               30-Apr-2024




3/21/2024                                                                                                               Page 14 of 32
            The World Bank                                                                               Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Comments
    IN01399261
    ►Reduced number of non-functioning water supply schemes - disaggregated by regions (Percentage, Custom)

                                       Baseline                   Actual (Previous)        Actual (Current)          End Target

    Value                              19.00                      19.00                    19.00                     15.00

    Date                               31-Jan-2020                31-Aug-2021              31-Aug-2021              30-Apr-2024

    Comments

  Enhancing citizen engagement and environmental and social management capacity
   IN01399246
    ►Enhancing transparency and accountability through increasing number of Woredas conducting pre-budget discussions (Text, Custom)

                                       Baseline                   Actual (Previous)        Actual (Current)         End Target
                                                                                                                    65% woredas with at
                                                                  11.9% with 35.2%
    Value                              36% with 46% women                                  72% with 40% women       least 30% female
                                                                  women
                                                                                                                    participation
    Date                               14-Sep-2017                21-Aug-2023              20-Feb-2024              30-Apr-2024

    Comments
    IN01399249
    ►Expansion of social accountability program in additional Woredas (Number, Custom)

                                       Baseline                   Actual (Previous)        Actual (Current)          End Target

    Value                              223.00                     317.00                   416.00                    500.00

    Date                               14-Sep-2017                21-Aug-2023              20-Feb-2024              30-Apr-2024

    Comments
    IN01399252
    ►250 woredas have environmental and social impact assessment (ESIA) system in place (Text, Custom)

                                       Baseline                   Actual (Previous)        Actual (Current)          End Target
                                       No systematic monitoring
    Value                                                         636.00                   636.00                    250 woredas
                                       of ESIAs

    Date                               14-Sep-2017                31-Aug-2021              31-Aug-2021              30-Apr-2024

    Comments
    IN01399255
    ►Increased number of woredas where local governments facilitate Social Accountability (Number, Custom)

                                       Baseline                   Actual (Previous)        Actual (Current)          End Target

    Value                              0.00                       0.00                     0.00                      417.00

    Date                               31-May-2021                21-Aug-2023              20-Feb-2024              30-Apr-2024

    Comments




3/21/2024                                                                                                             Page 15 of 32
            The World Bank                                                                                    Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Deepening fiduciary aspects of basic service delivery
   IN01399250
    ►Procurement performance reported by the regional regulatory bodies based on KPIs on three basic sect (Number, Custom)

                                       Baseline                     Actual (Previous)           Actual (Current)          End Target

    Value                              4.00                         9.00                        9.00                      9.00

    Date                               14-Sep-2017                  31-Aug-2021                 20-Feb-2024              30-Apr-2024

    Comments
    IN01399253
    ►25% of woredas referred F&C cases to REACCs for action and report the same to BOFEDs (Text, Custom)

                                       Baseline                     Actual (Previous)           Actual (Current)         End Target
                                                                    288 woredas use             288 woredas use
                                                                    electronic recording of     electronic recording of
                                       Decisions on cases are
    Value                                                           F&C cases as verified by    F&C cases as verified    250 woredas (25%)
                                       not regularly followed up.
                                                                    DLR 10.c.1 report (at       by DLR 10.c.1 report (at
                                                                    least excel system).        least excel system).
    Date                               14-Sep-2017                  31-Aug-2021                 31-Aug-2021              21-Aug-2023

    Comments
    IN01399256
    ►Establishment of a Government system for benchmarking Woreda PFM performance (PFMBenchmarking Rating (Text, Custom)

                                       Baseline                     Actual (Previous)           Actual (Current)         End Target
                                       Operational guideline for                                                         Improve results on the
                                       PFM Woreda                                                                        selected PFM
                                       benchmarking has been                                                             indicators: Cash
    Value                                                           Completed                   Completed
                                       developed; Cash                                                                   management to 50%;
                                       management 19%; and                                                               and Bank
                                       Bank reconciliation 45%                                                           reconciliation to 65%
    Date                               15-May-2017                  31-Aug-2021                 31-Aug-2021              21-Aug-2023

    Comments

  Improved development information and data for service delivery
    IN01399247
    ►Population and Housing Census conducted, results released, and census microdata available online (Text, Custom)

                                       Baseline                     Actual (Previous)           Actual (Current)         End Target
                                                                                                                         Micro data of 2017
                                       Last PHC conducted in                                    This indicator is
    Value                                                           This indicator is dropped                            PHC publically
                                       2007                                                     dropped
                                                                                                                         accessible online
    Date                               14-Sep-2017                  31-Aug-2021                 31-Aug-2021              30-Nov-2020

    Comments


 Intermediate Results Indicators by Results Areas




3/21/2024                                                                                                                  Page 16 of 32
            The World Bank                                                                                      Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Ensuring equitable access to basic services
   IN01399262
    ►Increase proportion of qualified teachers grade 1-4 (diploma level) in Afar, Somali, SNNP and Oromia (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              52.00                        71.98                         71.98                     60.00

    Date                               14-Sep-2017                  31-Aug-2021                   31-Aug-2021              30-Nov-2023

    Comments
    IN01399272
    ►Increased proportion of qualified female agricultural development agents (Diploma level) (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              15.00                        26.55                         26.55                     20.00

    Date                               16-Dec-2015                  31-Aug-2021                   31-Aug-2021              30-Nov-2020

    Comments
    IN01399273
    ►Improved gender parity index in grade 5–8 net enrollment rates in bottom 20% of Woredas (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              82.00                        92.00                         92.00                     92.00

    Date                               14-Sep-2017                  31-Aug-2021                   31-Aug-2021              30-Nov-2020

    Comments
    IN01399277
    ►Share of primary schools (grade 1–8) with full Water, Sanitation, and Hygiene facilities (excl.Addis (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              2.00                         27.00                         27.00                     12.00

    Date                               14-Sep-2017                  31-Aug-2021                   31-Aug-2021              31-Oct-2023

    Comments
    IN01399281
    ►Antenatal care +4 rate (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              76.00                        70.00                         70.00                     95.00

    Date                               14-Sep-2017                  31-Aug-2021                   31-Aug-2021              30-Apr-2024

    Comments
    IN01399282
    ►Availability of water services at health facilities in the bottom 4 regions (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target


3/21/2024                                                                                                                    Page 17 of 32
            The World Bank                                                                                 Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Value                              28.00                       28.00                     28.00                     56.00

    Date                               14-Sep-2017                 31-Aug-2021               31-Aug-2021              30-Apr-2024

    Comments
    IN01399283
    ►Increased number of health extension workers qualified to Level 4 standard in 4 regions (Number, Custom)

                                       Baseline                    Actual (Previous)         Actual (Current)          End Target

    Value                              11,118.00                   16,207.00                 16,207.00                 18,351.00

    Date                               14-Sep-2017                 31-Aug-2021               31-Aug-2021              30-Apr-2024

    Comments
    IN01399284
    ►Increased proportion of qualified female agricultural development agents (diploma level) (Percentage, Custom)

                                       Baseline                    Actual (Previous)         Actual (Current)          End Target

    Value                              20.00                       26.55                     26.55                     26.00

    Date                               14-Sep-2017                 31-Aug-2021               31-Aug-2021              30-Nov-2023

    Comments
    IN01399285
    ►In 50% of PSNP Woredas in Highland areas at least 50% of deployed frontline workers have received nu (Text, Custom)

                                       Baseline                    Actual (Previous)         Actual (Current)         End Target
                                                                                             In 50% of PSNP           In 50% of PSNP
                                                                   In 50% of PSNP woredas
                                                                                             woredas in highland      woredas in highland
                                       Frontline service providers in highland areas 100%
                                                                                             areas 100% of deployed   areas 50% of deployed
    Value                              are not adequately trained of deployed frontline
                                                                                             frontline workers have   frontline workers have
                                       on nutrition BCC            workers have received
                                                                                             received nutrition       received nutrition
                                                                   nutrition training
                                                                                             training                 training.
    Date                               14-Sep-2017                 31-Aug-2021               31-Aug-2021              30-Nov-2023

    Comments
    IN01399286
    ►Strengthen Woreda level coordination platform, using existing ToR, in PSNP Woredas (Text, Custom)

                                       Baseline                    Actual (Previous)         Actual (Current)        End Target
                                                                                                                     Woreda level
                                                                   Platform in 148 woredas   Platform in 148 woredas
                                       The existing woreda level                                                     coordination platform
                                                                   have been established     have been established
    Value                              nutrition coordination is                                                     is in place, consistent
                                                                   which is 52% of the 350   which is 52% of the 350
                                       not functioning well.                                                         with agreed TORs, in
                                                                   woreda target.            woreda target.
                                                                                                                     all PSNP woredas.
    Date                               14-Sep-2017                 31-Aug-2021               31-Aug-2021              30-Nov-2023

    Comments



  Enhancing Citizen Engagement, Environmental and Social Management Capacity
   IN01399265



3/21/2024                                                                                                               Page 18 of 32
            The World Bank                                                                               Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)



   ►Enhancing transparency and accountability through increasing share of Woredas and regions/city admin that have assigned GRM
   officers/staff (Text, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)          End Target
                                                                 9 regions and 2 city      9 regions and 2 city
                                       80% of woredas on 8                                                          80% of woredas on 11
                                                                 administrations have      administrations have
                                       regions/city-                                                                regions/city-
    Value                                                        assigned GRM staff in     assigned GRM staff in
                                       administrations have                                                         administrations have
                                                                 more than 90% of their    more than 90% of their
                                       assigned GRM officers                                                        assigned GRM officers
                                                                 Woredas                   Woredas
    Date                               14-Sep-2017               21-Aug-2023               21-Aug-2023              30-Nov-2023

    Comments
    IN01399268
    ►Government framework for CE developed (Yes/No, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)          End Target

    Value                              No                        No                        No                        Yes

    Date                               01-Sep-2017               31-Aug-2021               31-Aug-2021              30-Nov-2020

    Comments
    IN01399271
    ►50% of actions identified in JAPs have been implemented in 60% of SA Woredas that had JAPs by Jan.19 (Text, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)         End Target
                                                                                                                    50% of actions
                                                                                                                    identified in JAPs have
                                       No systematic monitoring Achieved more than         Achieved more than       been implemented in
    Value
                                       of implementation of JAPs target                    target                   60% of SA woredas
                                                                                                                    that had JAPs by
                                                                                                                    January 1, 2019.
    Date                               14-Sep-2017               31-Aug-2021               31-Aug-2021              30-Nov-2023

    Comments
    IN01399274
    ►Staff of basic service sectors and oversight bodies trained on the ESMS Operational Manual (Number, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)          End Target

    Value                              200.00                    4,768.00                  4,768.00                  500.00

    Date                               18-Sep-2017               31-Aug-2021               31-Aug-2021              30-Nov-2023

    Comments
    IN01399278
    ►ESMS Operational Manual customized in the remaining five regions and two city - administrations (Number, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)          End Target

    Value                              0.00                      11.00                     11.00                     11.00

    Date                               14-Sep-2017               31-Aug-2021               31-Aug-2021              30-Nov-2023

    Comments



3/21/2024                                                                                                               Page 19 of 32
            The World Bank                                                                                     Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Deepening Fiduciary Aspects of Basic Service Delivery
   IN01399264
   ►Benchmarking-related PFM reform program is drafted and implemented for the 50% of Woredas with lowest scores in PFM benchmarking
   (Text, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)        End Target
                                                                   The PFM benchmarking          The PFM benchmarking
                                                                   is developed and rolled       is developed and rolled
                                                                   out/implemented.              out/implemented.
    Value                              0.00                                                                              50%
                                                                   Training is conducted for     Training is conducted
                                                                   50% of low rated              for 50% of low rated
                                                                   woredas.                      woredas.
    Date                               14-Sep-2017                 31-Aug-2021                   31-Aug-2021               30-Nov-2023

    Comments
    IN01399267
    ►Internal audit functions in the subregional levels are properly staffed and trained (Text, Custom)

                                       Baseline                     Actual (Previous)            Actual (Current)          End Target

    Value                              53.5%                       Data not yet available.       Data not yet available.   80%

    Date                               14-Sep-2017                 31-Aug-2021                   31-Aug-2021               30-Nov-2023

    Comments
    IN01399270
    ►Procurement Audit carried out annually on on 10% of Woredas and on all three basic sectors (agricult (Percentage, Custom)

                                       Baseline                     Actual (Previous)            Actual (Current)          End Target

    Value                              10.00                       30.44                         30.44                     30.00

    Date                               14-Sep-2017                 31-Aug-2021                   31-Aug-2021               30-Apr-2024

    Comments
    IN01399275
    ►Increased human resource capacity of Woredas to effectively respond to fraud and corruption complain (Percentage, Custom)

                                       Baseline                     Actual (Previous)            Actual (Current)          End Target

    Value                              50.70                       75.00                         75.00                     60.00

    Date                               14-Sep-2017                 31-Aug-2021                   31-Aug-2021               30-Nov-2023

   Comments
   IN01399279
   ►Woreda budget and standing comittee review annual audit findings and action has been taken in 25% of woredas where audit report is
   submitted (Text, Custom)

                                       Baseline                     Actual (Previous)            Actual (Current)          End Target

    Value                              15%                         Data not yet available        Data not yet available    25%

    Date                               14-Sep-2017                 31-Aug-2021                   31-Aug-2021               30-Apr-2024

    Comments


3/21/2024                                                                                                                   Page 20 of 32
            The World Bank                                                                               Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




  Results and Data Quality Assurance
   IN01399263
    ►Analytical products (Text, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)          End Target
                                                                                                                     At least two per year
    Value                              N/A                       3.00                      3.00                      for each sector/agency
                                                                                                                     supported
    Date                               14-Sep-2017               31-Aug-2021               31-Aug-2021               30-Nov-2023

    Comments
    IN01399266
    ►HIES survey published (Text, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)       End Target
                                                                                                                  Household Income
                                                                 Household Income          Household Income
                                                                                                                  Consumption and
                                                                 Consumption and           Consumption and
                                                                                                                  Expenditure Survey
    Value                              No                        Expenditure Survey has    Expenditure Survey has
                                                                                                                  has been published,
                                                                 been carried out and      been carried out and
                                                                                                                  with gender
                                                                 published.                published.
                                                                                                                  disaggregated data.
    Date                               16-Dec-2015               01-Sep-2020               01-Sep-2020               30-Nov-2023

    Comments
    IN01399269
    ►DHS survey published (Text, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)          End Target
                                                                                                                     DHS has been carried
                                                                 DHS has bee carried out   DHS has bee carried
    Value                              No                                                                            out and the results
                                                                 and published             out and published
                                                                                                                     published
    Date                               16-Dec-2015               31-Aug-2021               31-Aug-2021               30-Nov-2020

    Comments
    IN01399276
    ►Completion of Agricultural Census with revised methodology (Text, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)          End Target
                                                                 Methodology was           Methodology was
                                                                 partially completed. Ag   partially completed. Ag
    Value                              No                                                                            Yes
                                                                 Census planned to be      Census planned to be
                                                                 conducted in 2020.        conducted in 2020.
    Date                               16-Dec-2015               31-Aug-2021               31-Aug-2021               21-Aug-2023

    Comments
    IN01399280
    ►Implementation of DQA recommendations for different sectors (Number, Custom)

                                       Baseline                  Actual (Previous)         Actual (Current)          End Target

    Value                              0.00                      5.00                      5.00                      3.00




3/21/2024                                                                                                             Page 21 of 32
            The World Bank                                                                                  Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Date                               16-Dec-2015               31-Aug-2021                  31-Aug-2021               01-Nov-2017

    Comments


 Disbursement Linked Indicators
 DLI_IND_TABLE
    ►DLI 1 DLI 1 Per capita increase in federal block grants transfer to regions, excluding Addis Ababa (Process, 90,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022

    Value                         1,240.00                     1,418.00                     1,418.00                     --

    Date                          14-Dec-2015                  01-Sep-2020                  01-Sep-2020                  --

    Comments



    ►DLI 2 DLI 2 Increases proportion of qualified female agricultural development agents (Intermediate Outcome, 40,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022

    Value                         20.00                        26.55                        26.55                        --

    Date                          01-Dec-2015                  01-Sep-2020                  01-Sep-2020                  --

                                  The Report submitted and under review
    Comments



    ►DLI 3 DLI 3 Health extension workers who have graduated with a Level 4 qualification (Output, 30,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022

    Value                         11,118.00                    16,207.00                    16,207.00                    --

    Date                          16-Dec-2015                  01-Sep-2020                  01-Sep-2020                  --

                                  Achieved and disburssed
    Comments


   ►DLI 4 DLI 4a:1: Incrased proportion of qualified teachers grade 1-4 (diploma level) in 4 regions (Afar, Somali, SNNPR, Oromia) (Output,
   60,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022

    Value                         52.00                        71.98                        71.98                        --

    Date                          --                           01-Sep-2020                  01-Sep-2020                  --

                                  Achieved and disbursed
    Comments


   ►DLI 5 DLI 5a (1) Improved geographic equity in education service delivery outcomes, based on Net Enrollment Rate grade 5-8 in the
   bottom 20% of Performing Woredas (Intermediate Outcome, 10,000,000.00, 0%)


3/21/2024                                                                                                                Page 22 of 32
            The World Bank                                                                                 Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




                                  Baseline                      Actual (Previous)           Actual (Current)             2022

    Value                         17.30                         28.00                       28.00                        --

    Date                          16-Dec-2015                   01-Sep-2020                01-Sep-2020                  --
                                  Report is reviewed and cleared for disbursement.
    Comments



   ►DLI 6 DLI 5a (2) Improved geographic equity in education service delivery outcomes, based on completion rate for girls in Grade 8 in the
   bottom 20% of Performing Woredas (Outcome, 10,000,000.00, 0%)


                                  Baseline                      Actual (Previous)           Actual (Current)             2022

    Value                         12.50                         23.00                       23.00                        --

    Date                          --                            01-Sep-2020                01-Sep-2020                  --

                                  Verified and disbursed
    Comments


   ►DLI 7 DLI 5a (3) Improved geographic equity in health service delivery outcomes, based on Penta 3 Vaccine coverage for children under
   one year of age in Bottom 20% of Performing Woredas (Intermediate Outcome, 15,000,000.00, 0%)


                                  Baseline                      Actual (Previous)           Actual (Current)             2022

    Value                         56.40                         63.30                       63.30                        --

    Date                          01-Dec-2015                   01-Sep-2020                01-Sep-2020                  --

                                  Verified and disbursed
    Comments



    ►DLI 8 DLI 6.3 Improved environmental and social management capacity at woreda level (Outcome, 50,000,000.00, 0%)


                                  Baseline                      Actual (Previous)           Actual (Current)             2022
                                                                250 Woredas from 4         250 Woredas from 4
                                  No systematic monitoring of   regions have ESM           regions have ESM
    Value                                                                                                                --
                                  ESIA                          capacity and are vetting   capacity and are vetting
                                                                projects.                  projects.
    Date                          01-Dec-2015                   01-Sep-2020                01-Sep-2020                  --
                                  250 Woredas from 4 regions have ESM capacity and are vetting projects. The DLI is achieved and cleared for
    Comments                      disbursement.



    ►DLI 9 DLI 7 Enhanced transparency and accountability through citizen engagement (Intermediate Outcome, 75,000,000.00, 0%)


                                  Baseline                      Actual (Previous)           Actual (Current)             2022
    Value                         FTA budget disclosure         ESAP 3 is launched, 77     ESAP 3 is launched, 77        --
                                  happening in all woredas,     additional Woredas are     additional Woredas are
                                  with informal pre-budget      selected and started       selected and started
                                  discussions during budget     implementation in 317      implementation in 317
                                  literacy training,            Woredas.                   Woredas.

3/21/2024                                                                                                               Page 23 of 32
            The World Bank                                                                                Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




                                  Standard GRM structures
                                  in 4 regions, including
                                  assigned staff at regional
                                  and woreda levels,

                                  SA Operational in 223
                                  woredas
    Date                          16-Dec-2015                   01-Sep-2020                01-Sep-2020                 --

                                  Due date for the DLI starts on May 1, 2019. The DLI number on the AF PAD is DLI 7.
    Comments


   ►DLI 10 DLI 8.1 and 8.2 Establishment of a government system for benchmarking Woreda PFM performance (Outcome, 21,000,000.00,
   0%)


                                  Baseline                      Actual (Previous)          Actual (Current)            2022

    Value                         N/A                           Completed                  Completed                   --

    Date                          16-Dec-2015                   01-Sep-2020                01-Sep-2020                 --

                                  The next DLI due date is by May 1, 2019. The DLI number on the AF PAD is DLI 8
    Comments



    ►DLI 11 DLI 8.3 An evaluation of the Woreda PFM Benchmarking Rating system is completed (Outcome, 10,500,000.00, 0%)


                                  Baseline                      Actual (Previous)          Actual (Current)            2022

    Value                         No PFM benchmarking           Completed                  Completed                   --

    Date                          01-Dec-2015                   01-Sep-2020                01-Sep-2020                 --

                                  The due date for the DLI is November 1, 2019
    Comments


   ►DLI 12 DLI 8.4 MOFEC/BoFED provides training for PFM capacity building to 20% of the Woreda finance and procurement staff in the 20%
   lowest performing woredas in each region, as assessed based on the Woreda (Outcome, 10,500,000.00, 0%)


                                  Baseline                      Actual (Previous)          Actual (Current)            2022

    Value                         no data                       Completed                  Completed                   --

    Date                          --                            01-Sep-2020                01-Sep-2020                 --

                                  The DLI is achieved well before the end date
    Comments



    ►DLI 13 DLI 8.5 Develop federal PFM reform strategy (Outcome, 5,000,000.00, 0%)


                                  Baseline                      Actual (Previous)          Actual (Current)            2022
                                                                DLI achieved as a PFM      DLI achieved as a PFM
    Value                         No PFM strategy exists                                                               --
                                                                strategy was developed.    strategy was developed.

    Date                          --                            01-Sep-2020                01-Sep-2020                 --



3/21/2024                                                                                                              Page 24 of 32
            The World Bank                                                                                   Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Comments



    ►DLI 14 DLI8.6 All nine (9) regions and two (2) city administration adopt PFM reform strategy (Outcome, 5,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)              2022

    Value                         No PFM strategy exists        Acheived                     Acheived                      --

    Date                          --                            01-Sep-2020                  01-Sep-2020                   --

                                  Under verification
    Comments


   ►DLI 15 DLI 8.7 and 8.9 Improved results on below selected PFM indicators i) Cash Management and ii) Bank Reconciliation (Outcome,
   10,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)              2022
                                  Cash management score:        DLR 8.7 is under review
    Value                         19%; Bank reconciliation      but data for DLR 8.9 is      Completed                     --
                                  score: 45% in EFY2009         not yet available
    Date                          --                            31-Aug-2021                  31-Aug-2021                   --
                                  Due date for results on the DLI is on November 1, 2019. DLR 8.7 is under review but for DLR 8.9 data is not
    Comments                      yet available.



    ►DLI 16 DLI #8.8 Repeat benchmarking PFM evaluation (Outcome, 20,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)              2022
                                  Operational guideline for
                                  PFM Woreda
    Value                                                       Data under review            Completed                     --
                                  benchmarking has been
                                  developed;
    Date                          --                            31-Aug-2021                  31-Aug-2021                   --
                                  Under review
    Comments



    ►DLI 17 DLI 9 Oversight function of Regional Procurement regulatory bodies has been improved (Outcome, 12,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)              2022
                                                                This is DLR 9.6:             This is DLR 9.6:
                                                                Procurement                  Procurement performance
                                                                performance is reported      is reported by four regions
                                                                by four regions (Amhara,     (Amhara, Oromia,
                                                                Oromia, SNNPR, Tigray)       SNNPR, Tigray) based on
                                                                based on KPIs on three       KPIs on three basic
    Value                         N/A                                                                                      --
                                                                basic sectors                sectors (agriculture,
                                                                (agriculture, health,        health, education)
                                                                education) pertaining to     pertaining to analyzed
                                                                analyzed data for EFY        data for EFY 2009. This is
                                                                2009. This is achieved.      achieved.


3/21/2024                                                                                                                  Page 25 of 32
            The World Bank                                                                                    Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Date                          16-Dec-2015                    01-Sep-2020                 01-Sep-2020                   --
                                  This is DLR 9.6: Procurement performance is reported by four regions (Amhara, Oromia, SNNPR, Tigray)
                                  based on KPIs on three basic sectors (agriculture, health, education) pertaining to analyzed data for EFY
    Comments
                                  2009. This is achieved.



   ►DLI 18 DLI #9.6 and 9.7 Oversight function of Regional Procurement regulatory bodies has been improved (Intermediate Outcome,
   20,000,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)              2022
                                  Procurement performance
                                  monitoring guideline
    Value                                                        Acheived                    Acheived                      --
                                  developed and data
                                  collection started EFY2009
    Date                          --                             01-Sep-2020                 01-Sep-2020                   --
                                  This is DLR 9.7: Procurement performance is reported by four regions (Amhara, Oromia, SNNPR, Tigray)
                                  based on KPIs on three basic sectors (agriculture, health, education) pertaining to analyzed data for EFY
    Comments
                                  2010. This is achieved.Verified and disbursed



   ►DLI 19 DLI # 9.8: Oversight function of Regional Procurement regulatory bodies has been improved (Intermediate Outcome,
   10,000,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)              2022
                                  Procurement performance
                                  monitoring guideline
    Value                                                        Acheived                    Acheived                      --
                                  developed and data
                                  collection started EFY2009
    Date                          --                             01-Sep-2020                 01-Sep-2020                   --
                                  Procurement data entry streamlined and continued to be collected based on KPIs on the three basic sectors
    Comments                      (agriculture, health, education) in the 9 regions. Due date for DLI is May 1, 2020.



   ►DLI 20 DLI # 9.9. Oversight function of Regional Procurement regulatory bodies has been improved (Intermediate Outcome,
   10,000,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)              2022
                                  Procurement performance
                                  monitoring guideline
    Value                                                        Achieved                    Achieved                      --
                                  developed and data
                                  collection started EFY2009
    Date                          --                             31-Aug-2021                 31-Aug-2021                   --

                                  Due date for DLI is November 1, 2020.
    Comments


   ►DLI 21 DLI 10 Strengthened capacity of woredas to effectively respond to fraud and corruption complaints (Intermediate Outcome,
   30,000,000.00, 0%)


                                  Baseline                       Actual (Previous)           Actual (Current)              2022
                                  Ethics officers are assigned
                                                                 Data no longer              Data no longer
    Value                         in 179 Woredas in 2                                                                      --
                                                                 monitoried.                 monitoried.
                                  regions

3/21/2024                                                                                                                  Page 26 of 32
            The World Bank                                                                              Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Date                          16-Dec-2015                  01-Sep-2020               01-Sep-2020                  --

                                  This DLI was discontinued in the AF PAD.
    Comments


   ►DLI 22 DLI 10(b) 4: Strengthened capacity of Woreda Council finance and budget standing committee members to provide effective
   oversight, transparency and accountability for budgets (Intermediate Outcome, 5,000,000.00, 0%)


                                  Baseline                     Actual (Previous)         Actual (Current)             2022
                                  Training manual developed,
                                  10% of Woredas received
                                  and reviewed audit report
    Value                         findings and followed up     Under verification        Completed                    --
                                  recommendation through
                                  their Budget and Finance
                                  Standing Committee.
    Date                          --                           31-Aug-2021               31-Aug-2021                  --

                                  Under verification
    Comments


   ►DLI 23 DLI 10 (c) 1: Strengthened capacity of Woredas to effectively respond to F&C complaints including disaggregation of Data and
   decision on cases (Intermediate Outcome, 10,000,000.00, 0%)


                                  Baseline                     Actual (Previous)         Actual (Current)             2022
                                  Record keeping is not IT-
                                  based and decision on
    Value                                                      Completed                 Completed                    --
                                  cases are not regularly
                                  followed up
    Date                          --                           01-Sep-2020               01-Sep-2020                  --

                                  Verified and completed
    Comments



    ►DLI 24 DLI 11 Improved development information and data for service delivery (Intermediate Outcome, 45,000,000.00, 0%)


                                  Baseline                     Actual (Previous)         Actual (Current)             2022

    Value                         N/A                          Reprogrammed              Reprogrammed                 --

    Date                          16-Dec-2015                  31-Aug-2021               31-Aug-2021                  --
                                  Reprogrammed and no longer monitored
    Comments



    ►DLI 25 DLI 11.6: Improved develpment information and data for service delivery (Intermediate Outcome, 15,000,000.00, 0%)


                                  Baseline                     Actual (Previous)         Actual (Current)             2022
                                  Last PHC conducted in
    Value                                                      Reprogrammed              Reprogrammed                 --
                                  2007

    Date                          --                           31-Aug-2021               31-Aug-2021                  --
    Comments                      This DLR is no longer monitored


3/21/2024                                                                                                             Page 27 of 32
            The World Bank                                                                                   Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    ►DLI 26 DLI 12.1 Improve nutrition services (Intermediate Outcome, 50,000,000.00, 0%)


                                  Baseline                        Actual (Previous)           Actual (Current)             2022
                                  The existing Woreda level
                                  nutrition coordination is not
                                  functioning well; frontline
                                  service providers are not
                                  adequately trained on           The coordination platform   The coordination platform
                                  nutrition BCC; 58%              is in place in 158          is in place in 158 woredas
    Value                                                                                                                  --
                                  mothers with children 0-23      woredas which is 52% of     which is 52% of the 350
                                  months have had contact         the 350 woreda target       woreda target
                                  with HEWs in the last 3
                                  months as per the IFPRI
                                  Impact Assessment from
                                  January 2016
    Date                          --                              01-Sep-2020                 01-Sep-2020                  --
                                  This result is preliminary as of December 5, 2018. Final results may change depending on the verification
    Comments                      report.



   ►DLI 27 1a.1: At least 60% is allocated to basic services on average at regional level (excluding Addis Ababa) on average in the regional
   budgets for EFY2014 (Output, 20,000,000.00, 0%)


                                  Baseline                        Actual (Previous)           Actual (Current)             2022

    Value                         60.00                           60.00                       60.00                        60.00

    Date                          --                              30-Jun-2020                 30-Jun-2020                  --

    Comments


   ►DLI 28 1a.2: At least 60% of regional budget (excluding Addis Ababa) on average is confirmed as spent on basic services in EFY2013
   (Output, 20,000,000.00, 0%)


                                  Baseline                        Actual (Previous)           Actual (Current)             2022

    Value                         60.00                           60.00                       60.00                        60.00

    Date                          --                              30-Jun-2020                 30-Jun-2020                  --

    Comments


   ►DLI 29 5c.1: A Health Extension Optimization Implementation Manual, with specific considerations for the pastoralist regions, to detail the
   implementation of the 2021 Health Extension Roadmap is approved (Process, 10,000,000.00, 0%)


                                  Baseline                        Actual (Previous)           Actual (Current)             2022
                                  No implementation manual        No implementation
    Value                                                                                     Completed                    --
                                  exists                          manual exists

    Date                          --                              01-Apr-2021                 01-Apr-2021                  --


3/21/2024                                                                                                                  Page 28 of 32
            The World Bank                                                                                  Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Comments


   ►DLI 30 5c.2: 80% of the 408 existing PSNP woredas use the new methodology for mass-targeting of beneficiaries (Outcome,
   20,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)             2022

    Value                         0.00                          0.00                         0.00                         80.00

    Date                          --                            01-Apr-2021                  01-Apr-2021                  --

    Comments


   ►DLI 31 5c.3: MOH provides integrated refresher training (IRT) on RMNCH module, as per the revised IRT manual and aligned with the
   2021 Health Extension Roadmap, for 85% of HEW in selected regions (Outcome, 20,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)             2022

    Value                         0.00                          0.00                         0.00                         85.00

    Date                          --                            01-Apr-2021                  01-Apr-2021                  --

                                  Completed
    Comments


   ►DLI 32 6.5: 350 woredas having ESIA system in place with an institutional setup, including human resources, and vets projects for their
   environmental and social impacts (Outcome, 20,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)             2022

    Value                         250.00                        250.00                       250.00                       350.00

    Date                          --                            01-Apr-2021                  01-Apr-2021                  --

    Comments


   ►DLI 33 7.13: 250 woredas publish Citizen Budget at woreda level for EFY2014 woreda budgets as per the agreed template (Outcome,
   20,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)             2022

    Value                         0.00                          0.00                         0.00                         250.00

    Date                          --                            01-Apr-2021                  01-Apr-2021                  --

    Comments



    ►DLI 34 7.14: Federal and regional government institutionalizes dialogue on the civil society sector (Output, 10,000,000.00, 0%)


                                  Baseline                      Actual (Previous)            Actual (Current)             2022




3/21/2024                                                                                                                 Page 29 of 32
            The World Bank                                                                                  Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Value                         0.00                         0.00                         0.00                         2.00

    Date                          --                           01-Apr-2021                  01-Apr-2021                  --

    Comments


   ►DLI 35 8.10: Six (6) regional and two (2) city administration governments allocate agreed portion of their annual budget to implement PFM
   reforms of their PFM reform strategies (Output, 10,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022
                                                                                                                         For EFY 2014 the
                                                                                                                         agreed allocation
                                                                                                                         will be (a) 0.1% of
                                                                                                                         their EFY 2013
                                                                                                                         budget for Amhara
                                                                                                                         National Regional
                                                                                                                         State, Southern
                                                                                                                         Nations,
                                                                                                                         Nationalities and
                                                                                                                         Peoples Regional
                                                                                                                         State, Somali
                                                                                                                         National Regional
    Value                         0.00                         0.00                         0.00                         State, Benishangul
                                                                                                                         Gumuz National
                                                                                                                         Regional State,
                                                                                                                         Gambella National
                                                                                                                         Regional State,
                                                                                                                         Addis Ababa City
                                                                                                                         Administration, and
                                                                                                                         Dire Dawa City
                                                                                                                         Administration; and
                                                                                                                         (b) 0.012% of EFY
                                                                                                                         2013 budget for
                                                                                                                         Oromia National
                                                                                                                         Regional State
    Date                          --                           01-Apr-2021                  01-Apr-2021                  --

                                  Partially achieved.
    Comments


   ►DLI 36 8.11: 50% of woredas in select regions (a) conduct fixed asset count for EFY2013 (b) reconcile with records (fixed asset registers)
   and (c) report the same to BoFED (Output, 5,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022

    Value                         34.00                        34.00                        34.00                        50.00

    Date                          --                           01-Apr-2021                  01-Apr-2021                  --

    Comments


   ►DLI 37 9.10: Eight regions reported Procurement Performance to their respective BoFED heads for each of the five basic sectors based on
   agreed KPIs pertaining to EFY2013 data with key elements addressed (Output, 10,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022



3/21/2024                                                                                                                Page 30 of 32
            The World Bank                                                                                 Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)




    Value                         0.00                         0.00                         0.00                         8.00

    Date                          --                           01-Apr-2021                  01-Apr-2021                  --

    Comments


   ►DLI 38 9.11: Dire Dawa City Administration and Sidama Region commenced procurement data entry for five basic sectors based on
   agreed KPIs and furnished data captured in the first three quarters of EFY2014 (Output, 10,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022

    Value                         0.00                         0.00                         0.00                         2.00

    Date                          --                           01-Apr-2021                  01-Apr-2021                  --

    Comments


   ►DLI 39 11.9: PDC, Ministry of Health and Ministry of Water Irrigation and Electricity implement the Digital MRS system (Output,
   10,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022

    Value                         No pilots undertaken         No pilots undertaken         Achieved                     --

    Date                          --                           01-Apr-2021                  01-Apr-2021                  --

    Comments


   ►DLI 40 13.2: Revised and validated two-year integrated functional and adult education IFAE program curriculum for one-year program
   endorsed by MoE (Output, 5,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022
                                  Old IFAE curriculum
    Value                                                      Old IFAE curriculum          Curriculum revised           --

    Date                          --                           01-Apr-2021                  01-Apr-2021                  --

    Comments


   ►DLI 41 13.3: 4% increase in the number of adults participating in the adult non-formal education program nationally in EFY2014 compared
   with the baseline in EFY2012 (Outcome, 15,000,000.00, 0%)


                                  Baseline                     Actual (Previous)            Actual (Current)             2022

    Value                         2,870,000.00                 2,870,000.00                 2,870,000.00                 3,000,000.00

    Date                          --                           01-Apr-2021                  01-Apr-2021                  --

    Comments




3/21/2024                                                                                                                Page 31 of 32
            The World Bank                                                                                Implementation Status & Results Report
            Enhancing Shared Prosperity through Equitable Services (P151432)



   ►DLI 42 15.2: 100 woredas establish functional WWT with at least 10 functional WaSHCOMs per woreda as per agreed definition of
   “functionality” (Outcome, 20,000,000.00, 0%)


                                  Baseline                        Actual (Previous)        Actual (Current)             2022

    Value                         0.00                            0.00                     0.00                         100.00

    Date                          --                              01-Apr-2021              01-Apr-2021                  --

                                  Fully acheived
    Comments



    ►DLI 43 16.1: PDC prepared and published policy briefs on the demographic dividend and fertility (Output, 5,000,000.00, 0%)


                                  Baseline                        Actual (Previous)        Actual (Current)             2022
                                                                                                                        Policy briefs
    Value                         No briefs published             No briefs published      No briefs published          prepared and
                                                                                                                        published
    Date                          --                              01-Apr-2021              01-Apr-2021                  --

    Comments


   ►DLI 44 16.2: A minimum of 300 health professionals deployed across the country are skilled with new strategies to support Gender Based
   Violence (GBV) survivors (Outcome, 15,000,000.00, 0%)


                                  Baseline                        Actual (Previous)        Actual (Current)             2022

    Value                         0.00                            0.00                     0.00                         300.00

    Date                          --                              01-Apr-2021              01-Apr-2021                  --

                                  Achieved and fully disbursed.
    Comments




3/21/2024                                                                                                               Page 32 of 32