The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Enhancing Shared Prosperity through Equitable Services (P151432) EASTERN AND SOUTHERN AFRICA | Ethiopia | Social Protection & Jobs Global Practice | Requesting Unit: AECE3 | Responsible Unit: HAES1 IBRD/IDA | Program-for-Results Financing | FY 2016 | Team Leader(s): Yoseph Abdissa Deressa, Belay Addise Cheffik Seq No: 18 | ARCHIVED on 21-Mar-2024 | ISR59844 | Created by: Yoseph Abdissa Deressa on 01-Feb-2024 | Modified by: Mariam Denise Brain on 07-Mar-2024 Program Development Objectives PDO Table Program Development Objective (from Program Appraisal Document) The objective of ESPES program is to improve equitable access to basic services and strengthen accountability systems at the decentralized level. The program aims to improve service delivery for the whole population of Ethiopia by improving results in health, education and agriculture services in the most poorly performing woredas and strengthening the overall decentralized service delivery system. Building on almost 10 years of support for basic services delivery, the ESPES focuses on leveraging the government’s broadprogram of service delivery support to promote equity, enhance quality of and access to services, and institutionalize critical systems for service delivery, especially at the woreda level. Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Implementation Status and Key Decisions Program status: The ESPES Program has been operational since 2015 and two additional financings were approved in September 2017 and May 2021. The total IDA financing to the GoE through ESPES is now US$1.55 billion until May 2024. The program in on track to achieve the program development objectives. Achievement and verification of results are progressing well. All the 40 Disbursement Linked Results (DLRs) of the 1st Additional Financing of ESPES (IDA Cr 6130-ET) were achieved and from the 2nd Additional Financing (IDA Cr 6883-ET), from the total 18 DLRs, 16 DLRs were achieved; the remaining 2 DLRs are under verification. The mission stressed the need to speed-up the submission of the remaining DLRs. The implementation of ESPES-financed activities has been paused in certain conflict-affected areas of the country owing to security concerns and insufficient implementation capacity. Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P151432 IDA-57160 Closed USD 600.00 600.00 0.00 597.66 5.92 99% P151432 IDA-61310 Effective USD 600.00 600.00 0.00 599.29 0.00 100% P151432 IDA-68830 Effective USD 250.00 250.00 0.00 200.44 33.30 86% P151432 IDA-D2290 Effective USD 100.00 100.00 0.00 98.61 0.48 100% 3/21/2024 Page 1 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) P151432 TF-A7523 Closed USD 7.67 7.67 0.00 7.67 0.00 100% P151432 TF-A9293 Effective USD 24.28 24.28 0.00 19.10 5.18 79% P151432 TF-B8723 Effective USD 1.19 1.19 0.00 1.19 0.00 100% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P151432 IDA-57160 Closed 15-Sep-2015 22-Oct-2015 11-Dec-2015 01-May-2019 31-May-2023 P151432 IDA-61310 Effective 14-Sep-2017 29-Sep-2017 05-Feb-2018 31-May-2023 31-May-2024 P151432 IDA-68830 Effective 20-May-2021 04-Jun-2021 27-Aug-2021 31-May-2024 31-May-2024 P151432 IDA-D2290 Effective 14-Sep-2017 29-Sep-2017 05-Feb-2018 31-May-2023 31-May-2024 P151432 TF-A7523 Closed 29-Aug-2018 29-Aug-2018 29-Aug-2018 31-May-2023 31-May-2023 P151432 TF-A9293 Effective 10-Dec-2018 05-Apr-2019 05-Apr-2019 31-May-2023 31-May-2024 P151432 TF-B8723 Effective 28-Jul-2022 29-Jul-2022 29-Jul-2022 31-May-2024 31-May-2024 DLI Disbursement Achievement Disbursed amount in Disbursement % for DLI ID DLI Type Description Coc DLI Amount Status Coc DLI Loan: IDA57160-001 Per Capita Increas in 1 Regular XDR 64,725,000.00 Fully Achieved 64,724,999.93 100 % budget FG grant tr Incrsd proption of qlfd 2 Regular XDR 21,575,000.00 Fully Achieved 21,574,999.96 100 % female agric dvp Incrsd health extn wrks 3 Regular XDR 21,575,000.00 Fully Achieved 21,574,999.95 100 % grdtd on Lev 4 Incrs in total no. enrolled in 4 Regular XDR 43,150,000.00 Fully Achieved 43,149,998.89 100 % gd 5-8 Improved geo equity 5a Regular XDR 43,150,000.00 Fully Achieved 43,149,999.95 100 % educ. and health Improved wealth equity Partially 5b Regular XDR 21,575,000.00 18,230,875.00 85 % educ. and health Achieved Improved Env and social Partially 6 Regular XDR 35,958,334.00 35,023,416.99 97 % mgmt capacity Achieved Enhanced Tranparency 7 Regular XDR 57,533,333.00 Fully Achieved 57,533,332.93 100 % and accountability Est. govt sys for 8 Regular XDR 33,081,666.00 Fully Achieved 33,081,665.93 100 % benchmarking PFM Oversight fn of reg. 9 Regular XDR 11,506,667.00 Fully Achieved 11,506,666.99 100 % procurement regulat Strengthened capacity 10a Regular XDR 21,575,000.00 Fully Achieved 21,574,999.97 100 % respond to fraud 3/21/2024 Page 2 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Strengthened capacity fin. 10b Regular XDR 12,945,000.00 Fully Achieved 12,944,999.99 100 % and budget 11 Regular Improv. dev. info and data XDR 43,150,000.00 Fully Achieved 43,149,999.88 100 % Loan: IDA61310-001 Per capita increase in 1 Regular XDR 64,976,000.00 Fully Achieved 64,975,999.96 100 % budgeted Fed Gov Incr.proportion of qualified 2 Regular XDR 28,600,000.00 Fully Achieved 28,600,000.00 100 % female agri # of health ext workers 3a Regular XDR 21,600,000.00 Fully Achieved 21,600,000.01 100 % qualified to Lev Incr. qualified teachers 4a Regular XDR 21,600,000.00 Fully Achieved 21,599,999.93 100 % grade 1-4 diplo Improved geographic Partially 5a Regular XDR 32,400,000.00 32,399,999.90 100 % equity in educ & hea Achieved Improved env. and social Partially 6 Regular XDR 36,000,000.00 36,000,000.00 100 % mgt capacity at Achieved Enhanced transparency Partially 7 Regular XDR 82,312,000.00 82,312,000.26 100 % and accountability Achieved Establishment of a gov. 8 Regular XDR 28,800,000.00 Fully Achieved 28,799,999.99 100 % sys. for benchma Oversight function of Reg'l 9 Regular XDR 28,800,000.00 Fully Achieved 28,799,999.97 100 % proc. reg. b Strengthened capacity of 10b Regular XDR 10,800,000.00 Fully Achieved 10,800,000.00 100 % Woreda Council Strengthened capacity of 10c Regular XDR 18,000,000.00 Fully Achieved 18,000,000.00 100 % Woredas to effe Partially 12 Regular Improve nutrition services XDR 21,600,000.00 21,599,999.98 100 % Achieved Expand Adult&Non-Formal 13 Regular XDR 10,612,000.00 Fully Achieved 10,612,000.00 100 % Education(ANFE) Protect basic health 14 Regular XDR 17,600,000.00 Fully Achieved 17,600,000.00 100 % delivery through th Improve Covergent deliv. 15 Regular XDR 7,300,000.00 Fully Achieved 7,300,000.00 100 % of services bet Loan: TFA7523-001 Penta 3 coverage for 5a1 Regular USD 2,283,238.00 Fully Achieved 2,283,238.00 100 % children < 1 in bot At lst teachrs hve diploma 4a1 Regular USD 2,265,029.00 Fully Achieved 2,265,029.00 100 % lvel qlifcati Oversight function of 9 Regular USD 521,207.00 Fully Achieved 521,207.00 100 % Regional Proc. Bod 12 Regular Improve Nutrition services USD 2,599,793.00 Fully Achieved 2,599,793.00 100 % Loan: IDA68830-001 3/21/2024 Page 3 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Protect gnl grant (GPG) 1a Regular XDR 28,200,000.00 Fully Achieved 28,200,000.00 100 % trnsf basic sce imp eqty edu,health,soc 5c Regular XDR 35,300,000.00 Fully Achieved 35,300,000.00 100 % prot sce dlv out improved environtl soc 6 Regular XDR 14,100,000.00 Fully Achieved 14,100,000.00 100 % mngmt capacit lev enhanced transp accnt Partially 7 Regular XDR 21,200,000.00 7,100,000.00 33 % thru citiz engagmt Achieved Est gov syst bench Partially 8 Regular XDR 10,600,000.00 2,662,500.00 25 % Woreda(PFM)bench ratg Achieved Oversight func reg proc 9 Regular XDR 14,200,000.00 Fully Achieved 14,200,000.00 100 % bodies improved Improved dev info data sce 11 Regular XDR 7,100,000.00 Fully Achieved 7,100,000.00 100 % delivery Expand Adult Non-Form 13 Regular XDR 14,100,000.00 Fully Achieved 14,100,000.00 100 % Educ (ANFE) sce Improve conv delivery sce Partially 15 Regular XDR 14,100,000.00 13,677,000.00 97 % better WaSH Achieved Promote gender awrns 16 Regular XDR 17,600,000.00 Fully Achieved 17,600,000.00 100 % women empowermnt Loan: TFB8723-001 Expand Adult & non formal 13 Regular USD 595,455.00 Fully Achieved 595,455.00 100 % education serv Promote gender 16 Regular awareness and women's USD 595,455.00 Fully Achieved 595,455.00 100 % emp Program Action Plan Action Description Undertake country wide study and understand cost of basic services at the national level Source DLI# Responsibility Timing Timing Value Status Technical MoFEC Due Date 31-Dec-2018 Completed Completion Measurement Submission of the study Comments Action Description Undertake a review of progress in FTA-SA linkage implementation Source DLI# Responsibility Timing Timing Value Status Client Due Date 31-Dec-2018 Completed Completion Measurement 3/21/2024 Page 4 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Comments Action Description Customize, rollout, and implement simplified procurement directives and procedures in woredas Source DLI# Responsibility Timing Timing Value Status Technical Client Due Date 31-Oct-2023 Completed Completion Measurement Directive issued Comments Decentralized resource allocation (a): Government hires local consultant to understand how regions allocate Action Description resources to Woredas, supported by TA from the World Bank Source DLI# Responsibility Timing Timing Value Status Technical MoFEC Due Date 30-Nov-2023 Completed Completion Measurement Analytical report on regional budget allocation Comments Decentralized resource allocation (b): Organize fora/forum for sharing of experiences among the regions on their Action Description block grant system allocation mechanisms Source DLI# Responsibility Timing Timing Value Status Technical MoFEC/World Bank Due Date 30-Apr-2024 In Progress Completion Measurement Report Comments Decentralized resource allocation (c): c. Take action, as needed, to ensure that Woreads has sufficient Action Description resources to delivery basic services. Source DLI# Responsibility Timing Timing Value Status MoFEC/Federation Technical Due Date 30-Apr-2024 In Progress Council Completion Measurement Increased allocation figure Comments Undertake targeted social and behavioral change communication intervention to Kebeles and households in bottom Action Description 20% of Woredas (list included in Technical Assessment) for improving health, education and nutrition outcomes 3/21/2024 Page 5 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Source DLI# Responsibility Timing Timing Value Status Technical MoE Recurrent Continuous In Progress Completion Measurement Report Comments Pilot demand side activity helping households access education services (for example, school feeding, child grants Action Description for schooling, or conditional cash transfers) in bottom 20% of Woredas Source DLI# Responsibility Timing Timing Value Status MoE/Region and Other Woreda Sector Recurrent Continuous Completed Bureaus Completion Measurement Report Comments The MoE is expending school feeding program throughout the country in collaboration with the regions. Strengthen sectoral collaboration for service delivery to better tackle intersectoral challenges at the federal and Action Description regional levels (supported by the SDS and informed by May 2017 JRIS findings) Source DLI# Responsibility Timing Timing Value Status Technical MoFEC Recurrent Continuous Completed Completion Measurement Meeting reports Comments Comments Sectoral task force meeting established and meeting bi-monthly to enhance sectoral collaboration. Undertake study on the constraints to Penta 3 vaccine coverage in bottom 20% of Woredas and propose actions for Action Description how to boost it Source DLI# Responsibility Timing Timing Value Status Technical MoH Due Date 30-Nov-2023 Completed Completion Measurement Report Comments The study on constraints to Penta 3 vaccine was competed Revise Integrated Refresher Training (IRT) modules for HEW and revise the PSNP frontline service provider training Action Description modules aligning with NNP2 Source DLI# Responsibility Timing Timing Value Status Technical MoH and MoARD Due Date 30-Nov-2023 Completed Completion Measurement Report from MoH 3/21/2024 Page 6 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Comments Revision of IRT module is completed, Federal Training of trainers (ToT) completed and rollout to regions is ongoing. Action Description Introducing a system within UNIS in order to disaggregate nutrition data by PSNP household status Source DLI# Responsibility Timing Timing Value Status Technical MoH Due Date 30-Nov-2023 In Progress Completion Measurement Report Comments Action Description Conduct training to Woreda level staff in Afar and Somali on collection of EMIS and HMIS data Source DLI# Responsibility Timing Timing Value Status MoE/MoH Due Date 31-Dec-2019 Completed Completion Measurement Comments Action Description Preparation of FTA guideline for the regional sector bureaus manual Source DLI# Responsibility Timing Timing Value Status Technical MoFEC Due Date 31-Dec-2019 Completed Completion Measurement Guideline dessimination Comments Conduct GRM training for at least one Woreda officer and one regional GRM officer in 9 regions and 2 city Action Description administrations Source DLI# Responsibility Timing Timing Value Status Other EIO Recurrent Yearly Completed Completion Measurement Number of trainees A total of 1805 GRM officers, Stockholders (Council, Woreda Administration), of which 1179 Male and 626 Female Comments and Judiciary) took part on GRM capacity building trainings. Strengthen coordination between basic service sectors and oversight bodies on environmental and social Action Description management: (b). Bi-annual meeting by environment and social oversight bodies organized by EFCCC. Source DLI# Responsibility Timing Timing Value Status 3/21/2024 Page 7 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Environmental and Social EFCCC and MOF Recurrent Semi-Annually Completed Systems Completion Measurement Report Due to COVID -19 and budget constraints annual forum and bi-annual meeting not conducted. EFCCC to convene Comments the annual forum & bi-annual meeting and provide status update – by next JRIS Action Description In each BoFED assign E&S management Channel One coordinator Source DLI# Responsibility Timing Timing Value Status MoFEC/BoFED Due Date 31-Dec-2018 Completed Completion Measurement Comments Action Description Customize the ESMS Operational Manual in five regions and the two city administrations Source DLI# Responsibility Timing Timing Value Status MoFEC Due Date 31-Dec-2019 Completed Completion Measurement Comments For repetitive internal control weaknesses, institute strong M&E system and take accountability measures to ensure that actions are taken; Action Description For long outstanding Advances, track long outstanding balances and take action to resolve them; Source DLI# Responsibility Timing Timing Value Status MoFEC and Technical Recurrent Yearly In Progress BOFEDs Completion Measurement Report As per EMCP’s explanation M& E system is established & appropriate action is being taken at all level. Comments As per COPCD ‘s field visit Internal auditors of regions are assigned to conduct post audit of the program costs. Action Description Address system challenges that improve internal controls: a. Finalize and rollout a payroll application software; Source DLI# Responsibility Timing Timing Value Status 3/21/2024 Page 8 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) MoFEC and Fiduciary Systems Recurrent Yearly In Progress BOFEDs Completion Measurement Payroll application software Comments The IBEX payroll system development is completed and is ready for piloting Address system challenges that improve internal controls: b. Make sure existing property management record Action Description system is operational at local level. Find automation options including replication of existing efficient computer systems (if any). Source DLI# Responsibility Timing Timing Value Status MoFEC and Fiduciary Systems Recurrent Yearly In Progress BOFEDs Completion Measurement Report Comments EMCP planned to strengthen internal audit & to work on the property management Address system challenges that improve internal control: C. Improve websites of BoFEDs to improve disclosure to Action Description address PEFA concerns; Source DLI# Responsibility Timing Timing Value Status MoFEC and Technical Recurrent Yearly In Progress BOFEDs Completion Measurement Report Comments ToR is under preparation to out-source / recruit qualified consultant. Action Description Address system challenges that improve internal control: d) Sustain and manage IBEX system at woredas effectively. Source DLI# Responsibility Timing Timing Value Status MoFEC and Technical Recurrent Yearly In Progress BOFEDs Completion Measurement Report IBEX is functioning in 983 woredas including newly established ones. It was learned that IBEX in addition to the 983 Comments woredas IBEX is functional in 920 sector & branch offices and 100 zones. Action Description Target reforms that address the internal audit challenge at decentralized level should be developed; Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems MoFEC/BoFED Recurrent Quarterly In Progress Completion Measurement Reform docment 3/21/2024 Page 9 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) As per explanation from EMCP, M& E system is established & appropriate action is being taken at all level. As per Comments COPCD ‘s field visit, Internal auditors of regions are assigned to conduct post audit of the program costs. Action Description Regions should fill vacant posts of internal auditors at local levels; Source DLI# Responsibility Timing Timing Value Status Technical MoFEC/BoFED Recurrent Yearly In Progress Completion Measurement Report Comments An ongoing activity Action Description Build capacity of auditors on an ongoing basis through regular trainings Source DLI# Responsibility Timing Timing Value Status MoFEC and Technical Recurrent Continuous In Progress BOFEDs Completion Measurement Report Comments Training was given to internal auditors on ongoing basis. Customize procurement performance measurement guideline and start data collection in Gambella, Afar, B. Gumuz, Action Description Somali and Harari regions Source DLI# Responsibility Timing Timing Value Status BoFEDs/ Regional Technical Recurrent Yearly In Progress Regulatory Bodies Completion Measurement Report Comments Provide TOT to REACCs by FEACC; REACCs conduct cascaded training to Woredas on record keeping and Action Description reporting of F&C cases Source DLI# Responsibility Timing Timing Value Status Other FEACC Recurrent Yearly Completed Completion Measurement Report Comments Action Description Inform the public through mass media (Regional) on compliant handling procedures 3/21/2024 Page 10 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Source DLI# Responsibility Timing Timing Value Status FEACC and Other Recurrent Yearly In Progress REACCs Completion Measurement Report Comments EIO is using airtime to create awareness to the public about GRM system At least 60% of the woredas in regions maintained internal audit department/unit with at least 85% of approved Action Description internal audit positions filled Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems DLI 14 MOF/BOFEDs Recurrent Yearly In Progress Completion Measurement Reports Comments PFM: (i) MoF and regions create action plans and take actions to address PEFA 2018 low scores in various aspects Action Description of PFM system Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems DLI 36 MoF/EMCP Due Date 30-Apr-2024 In Progress Completion Measurement Report Comments PFM: (ii) At least 60% of the woredas in regions maintained internal audit department/unit with at least 85% of Action Description approved internal audit positions filled Source DLI# Responsibility Timing Timing Value Status Fiduciary Systems DLI 35 BoFEDs and MoF Recurrent Yearly In Progress Completion Measurement Report Comments PFM: (iii) All regional BoFEDs and ORAGs make functional their websites and disclose budget, budget execution and Action Description audit reports and other important resources to enhance fiscal transparency Source DLI# Responsibility Timing Timing Value Status DLI 10 BOFEDS and Fiduciary Systems Due Date 30-Nov-2023 In Progress ORAGs Completion Measurement Report 3/21/2024 Page 11 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Comments Procurement: With technical assistance from FPPPA BoFEDs prepare revised draft regional procurement laws based Action Description on the newly revised federal law Source DLI# Responsibility Timing Timing Value Status DLI 17 FPPPA and Fiduciary Systems Due Date 30-Nov-2023 In Progress BOFEDs Completion Measurement Report Comments Governance: FEACC providing a cascaded training on record keeping and reporting of F&C to REACC and WoFED Action Description ethics officers from at least the 100 woredas that received computers through the program Source DLI# Responsibility Timing Timing Value Status DLI 23 FEACC, REACC Fiduciary Systems Due Date 30-Nov-2023 In Progress and WOFEDs Completion Measurement Report Comments Environmental and Social Safeguards: Strengthen the Social Accountability Unit in COPCD with full time safeguards Action Description specialist Source DLI# Responsibility Timing Timing Value Status Environmental and Social DLI 8 MoF Due Date 30-Apr-2024 In Progress Systems Completion Measurement Report Comments Gender Based Violence: MoH conducts cascaded training for GBV training of trainers to reach health professionals in Action Description all ten regions including special considerations as needed for low land regions. Source DLI# Responsibility Timing Timing Value Status Technical DLI 44 MoH Due Date 30-Apr-2024 In Progress Completion Measurement Report Comments 3/21/2024 Page 12 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance -- High High Macroeconomic -- Substantial Substantial Sector Strategies and Policies -- Low Low Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and -- Moderate Moderate Sustainability Fiduciary Substantial Substantial Substantial Environment and Social Moderate Substantial Substantial Stakeholders -- Moderate Moderate Other -- -- -- Overall Substantial Substantial Substantial Results PDO Indicators by Objectives / Outcomes Ensuring Equitable Acess to basic Servces IN01399220 ►Improved Net Enrollment Rate for grades 5–8 in bottom 20% Woredas (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 17.30 28.00 28.00 28.30 Date 22-Aug-2017 31-Aug-2021 31-Aug-2021 30-Nov-2020 Comments IN01399248 ►Increased grade 8 completion rates for girls in bottom 20% of Woredas (New) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 12.50 23.00 23.00 20.50 Date 22-Aug-2017 31-Aug-2021 31-Aug-2021 30-Nov-2020 Comments IN01399251 ►Improved geographic equity in Penta 3 outcomes in bottom 20% Woredas (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target 3/21/2024 Page 13 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Value 56.40 63.50 63.50 62.40 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Apr-2024 Comments IN01399254 ►Births attended by a skilled birth attendant (New) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 72.00 62.00 62.00 95.00 Date 14-Sep-2017 21-Aug-2023 20-Feb-2024 30-Apr-2024 Comments IN01399257 ►Increased number of female-headed rural households accessing improved agricultural extension service (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4,253,000.00 5,141,000.00 5,141,000.00 5,325,000.00 Date 14-Sep-2017 21-Aug-2023 21-Aug-2023 30-Apr-2024 Comments IN01399258 ►58% of mothers with children aged 0-23 months (PSNP households only) living in PSNP Woredas in Highl (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Data not yet available Data not yet available Value 33.00 from MoE related to from MoE related to 58.00 2018/19 performance 2018/19 performance Date 29-Jan-2016 30-Nov-2023 20-Feb-2024 30-Apr-2024 Comments IN01399259 ►Per capita increase in budgeted federal government block grant transfers to regions, excluding Addis Ababa (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 1,240.00 1,712.00 1,712.00 1,696.00 Date 14-Sep-2017 31-Aug-2021 20-Feb-2024 30-Nov-2020 Comments IN01399260 ►Increased number of adults participated in the adult non-formal education program – disaggregated by regions and gender (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 2.87 Million 2.87 Million 2.87 Million 3.2 Million Date 31-Jul-2020 31-Aug-2021 20-Feb-2024 30-Apr-2024 3/21/2024 Page 14 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Comments IN01399261 ►Reduced number of non-functioning water supply schemes - disaggregated by regions (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 19.00 19.00 19.00 15.00 Date 31-Jan-2020 31-Aug-2021 31-Aug-2021 30-Apr-2024 Comments Enhancing citizen engagement and environmental and social management capacity IN01399246 ►Enhancing transparency and accountability through increasing number of Woredas conducting pre-budget discussions (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 65% woredas with at 11.9% with 35.2% Value 36% with 46% women 72% with 40% women least 30% female women participation Date 14-Sep-2017 21-Aug-2023 20-Feb-2024 30-Apr-2024 Comments IN01399249 ►Expansion of social accountability program in additional Woredas (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 223.00 317.00 416.00 500.00 Date 14-Sep-2017 21-Aug-2023 20-Feb-2024 30-Apr-2024 Comments IN01399252 ►250 woredas have environmental and social impact assessment (ESIA) system in place (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target No systematic monitoring Value 636.00 636.00 250 woredas of ESIAs Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Apr-2024 Comments IN01399255 ►Increased number of woredas where local governments facilitate Social Accountability (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 417.00 Date 31-May-2021 21-Aug-2023 20-Feb-2024 30-Apr-2024 Comments 3/21/2024 Page 15 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Deepening fiduciary aspects of basic service delivery IN01399250 ►Procurement performance reported by the regional regulatory bodies based on KPIs on three basic sect (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4.00 9.00 9.00 9.00 Date 14-Sep-2017 31-Aug-2021 20-Feb-2024 30-Apr-2024 Comments IN01399253 ►25% of woredas referred F&C cases to REACCs for action and report the same to BOFEDs (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 288 woredas use 288 woredas use electronic recording of electronic recording of Decisions on cases are Value F&C cases as verified by F&C cases as verified 250 woredas (25%) not regularly followed up. DLR 10.c.1 report (at by DLR 10.c.1 report (at least excel system). least excel system). Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 21-Aug-2023 Comments IN01399256 ►Establishment of a Government system for benchmarking Woreda PFM performance (PFMBenchmarking Rating (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Operational guideline for Improve results on the PFM Woreda selected PFM benchmarking has been indicators: Cash Value Completed Completed developed; Cash management to 50%; management 19%; and and Bank Bank reconciliation 45% reconciliation to 65% Date 15-May-2017 31-Aug-2021 31-Aug-2021 21-Aug-2023 Comments Improved development information and data for service delivery IN01399247 ►Population and Housing Census conducted, results released, and census microdata available online (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Micro data of 2017 Last PHC conducted in This indicator is Value This indicator is dropped PHC publically 2007 dropped accessible online Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2020 Comments Intermediate Results Indicators by Results Areas 3/21/2024 Page 16 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Ensuring equitable access to basic services IN01399262 ►Increase proportion of qualified teachers grade 1-4 (diploma level) in Afar, Somali, SNNP and Oromia (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 52.00 71.98 71.98 60.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399272 ►Increased proportion of qualified female agricultural development agents (Diploma level) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 15.00 26.55 26.55 20.00 Date 16-Dec-2015 31-Aug-2021 31-Aug-2021 30-Nov-2020 Comments IN01399273 ►Improved gender parity index in grade 5–8 net enrollment rates in bottom 20% of Woredas (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 82.00 92.00 92.00 92.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2020 Comments IN01399277 ►Share of primary schools (grade 1–8) with full Water, Sanitation, and Hygiene facilities (excl.Addis (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 2.00 27.00 27.00 12.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 31-Oct-2023 Comments IN01399281 ►Antenatal care +4 rate (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 76.00 70.00 70.00 95.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Apr-2024 Comments IN01399282 ►Availability of water services at health facilities in the bottom 4 regions (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target 3/21/2024 Page 17 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Value 28.00 28.00 28.00 56.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Apr-2024 Comments IN01399283 ►Increased number of health extension workers qualified to Level 4 standard in 4 regions (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 11,118.00 16,207.00 16,207.00 18,351.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Apr-2024 Comments IN01399284 ►Increased proportion of qualified female agricultural development agents (diploma level) (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 20.00 26.55 26.55 26.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399285 ►In 50% of PSNP Woredas in Highland areas at least 50% of deployed frontline workers have received nu (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target In 50% of PSNP In 50% of PSNP In 50% of PSNP woredas woredas in highland woredas in highland Frontline service providers in highland areas 100% areas 100% of deployed areas 50% of deployed Value are not adequately trained of deployed frontline frontline workers have frontline workers have on nutrition BCC workers have received received nutrition received nutrition nutrition training training training. Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399286 ►Strengthen Woreda level coordination platform, using existing ToR, in PSNP Woredas (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Woreda level Platform in 148 woredas Platform in 148 woredas The existing woreda level coordination platform have been established have been established Value nutrition coordination is is in place, consistent which is 52% of the 350 which is 52% of the 350 not functioning well. with agreed TORs, in woreda target. woreda target. all PSNP woredas. Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments Enhancing Citizen Engagement, Environmental and Social Management Capacity IN01399265 3/21/2024 Page 18 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) ►Enhancing transparency and accountability through increasing share of Woredas and regions/city admin that have assigned GRM officers/staff (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 9 regions and 2 city 9 regions and 2 city 80% of woredas on 8 80% of woredas on 11 administrations have administrations have regions/city- regions/city- Value assigned GRM staff in assigned GRM staff in administrations have administrations have more than 90% of their more than 90% of their assigned GRM officers assigned GRM officers Woredas Woredas Date 14-Sep-2017 21-Aug-2023 21-Aug-2023 30-Nov-2023 Comments IN01399268 ►Government framework for CE developed (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 01-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2020 Comments IN01399271 ►50% of actions identified in JAPs have been implemented in 60% of SA Woredas that had JAPs by Jan.19 (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target 50% of actions identified in JAPs have No systematic monitoring Achieved more than Achieved more than been implemented in Value of implementation of JAPs target target 60% of SA woredas that had JAPs by January 1, 2019. Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399274 ►Staff of basic service sectors and oversight bodies trained on the ESMS Operational Manual (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 200.00 4,768.00 4,768.00 500.00 Date 18-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399278 ►ESMS Operational Manual customized in the remaining five regions and two city - administrations (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 11.00 11.00 11.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments 3/21/2024 Page 19 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Deepening Fiduciary Aspects of Basic Service Delivery IN01399264 ►Benchmarking-related PFM reform program is drafted and implemented for the 50% of Woredas with lowest scores in PFM benchmarking (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target The PFM benchmarking The PFM benchmarking is developed and rolled is developed and rolled out/implemented. out/implemented. Value 0.00 50% Training is conducted for Training is conducted 50% of low rated for 50% of low rated woredas. woredas. Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399267 ►Internal audit functions in the subregional levels are properly staffed and trained (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 53.5% Data not yet available. Data not yet available. 80% Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399270 ►Procurement Audit carried out annually on on 10% of Woredas and on all three basic sectors (agricult (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 10.00 30.44 30.44 30.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Apr-2024 Comments IN01399275 ►Increased human resource capacity of Woredas to effectively respond to fraud and corruption complain (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 50.70 75.00 75.00 60.00 Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399279 ►Woreda budget and standing comittee review annual audit findings and action has been taken in 25% of woredas where audit report is submitted (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 15% Data not yet available Data not yet available 25% Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Apr-2024 Comments 3/21/2024 Page 20 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Results and Data Quality Assurance IN01399263 ►Analytical products (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target At least two per year Value N/A 3.00 3.00 for each sector/agency supported Date 14-Sep-2017 31-Aug-2021 31-Aug-2021 30-Nov-2023 Comments IN01399266 ►HIES survey published (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Household Income Household Income Household Income Consumption and Consumption and Consumption and Expenditure Survey Value No Expenditure Survey has Expenditure Survey has has been published, been carried out and been carried out and with gender published. published. disaggregated data. Date 16-Dec-2015 01-Sep-2020 01-Sep-2020 30-Nov-2023 Comments IN01399269 ►DHS survey published (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target DHS has been carried DHS has bee carried out DHS has bee carried Value No out and the results and published out and published published Date 16-Dec-2015 31-Aug-2021 31-Aug-2021 30-Nov-2020 Comments IN01399276 ►Completion of Agricultural Census with revised methodology (Text, Custom) Baseline Actual (Previous) Actual (Current) End Target Methodology was Methodology was partially completed. Ag partially completed. Ag Value No Yes Census planned to be Census planned to be conducted in 2020. conducted in 2020. Date 16-Dec-2015 31-Aug-2021 31-Aug-2021 21-Aug-2023 Comments IN01399280 ►Implementation of DQA recommendations for different sectors (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 5.00 5.00 3.00 3/21/2024 Page 21 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Date 16-Dec-2015 31-Aug-2021 31-Aug-2021 01-Nov-2017 Comments Disbursement Linked Indicators DLI_IND_TABLE ►DLI 1 DLI 1 Per capita increase in federal block grants transfer to regions, excluding Addis Ababa (Process, 90,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 1,240.00 1,418.00 1,418.00 -- Date 14-Dec-2015 01-Sep-2020 01-Sep-2020 -- Comments ►DLI 2 DLI 2 Increases proportion of qualified female agricultural development agents (Intermediate Outcome, 40,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 20.00 26.55 26.55 -- Date 01-Dec-2015 01-Sep-2020 01-Sep-2020 -- The Report submitted and under review Comments ►DLI 3 DLI 3 Health extension workers who have graduated with a Level 4 qualification (Output, 30,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 11,118.00 16,207.00 16,207.00 -- Date 16-Dec-2015 01-Sep-2020 01-Sep-2020 -- Achieved and disburssed Comments ►DLI 4 DLI 4a:1: Incrased proportion of qualified teachers grade 1-4 (diploma level) in 4 regions (Afar, Somali, SNNPR, Oromia) (Output, 60,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 52.00 71.98 71.98 -- Date -- 01-Sep-2020 01-Sep-2020 -- Achieved and disbursed Comments ►DLI 5 DLI 5a (1) Improved geographic equity in education service delivery outcomes, based on Net Enrollment Rate grade 5-8 in the bottom 20% of Performing Woredas (Intermediate Outcome, 10,000,000.00, 0%) 3/21/2024 Page 22 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Baseline Actual (Previous) Actual (Current) 2022 Value 17.30 28.00 28.00 -- Date 16-Dec-2015 01-Sep-2020 01-Sep-2020 -- Report is reviewed and cleared for disbursement. Comments ►DLI 6 DLI 5a (2) Improved geographic equity in education service delivery outcomes, based on completion rate for girls in Grade 8 in the bottom 20% of Performing Woredas (Outcome, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 12.50 23.00 23.00 -- Date -- 01-Sep-2020 01-Sep-2020 -- Verified and disbursed Comments ►DLI 7 DLI 5a (3) Improved geographic equity in health service delivery outcomes, based on Penta 3 Vaccine coverage for children under one year of age in Bottom 20% of Performing Woredas (Intermediate Outcome, 15,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 56.40 63.30 63.30 -- Date 01-Dec-2015 01-Sep-2020 01-Sep-2020 -- Verified and disbursed Comments ►DLI 8 DLI 6.3 Improved environmental and social management capacity at woreda level (Outcome, 50,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 250 Woredas from 4 250 Woredas from 4 No systematic monitoring of regions have ESM regions have ESM Value -- ESIA capacity and are vetting capacity and are vetting projects. projects. Date 01-Dec-2015 01-Sep-2020 01-Sep-2020 -- 250 Woredas from 4 regions have ESM capacity and are vetting projects. The DLI is achieved and cleared for Comments disbursement. ►DLI 9 DLI 7 Enhanced transparency and accountability through citizen engagement (Intermediate Outcome, 75,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value FTA budget disclosure ESAP 3 is launched, 77 ESAP 3 is launched, 77 -- happening in all woredas, additional Woredas are additional Woredas are with informal pre-budget selected and started selected and started discussions during budget implementation in 317 implementation in 317 literacy training, Woredas. Woredas. 3/21/2024 Page 23 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Standard GRM structures in 4 regions, including assigned staff at regional and woreda levels, SA Operational in 223 woredas Date 16-Dec-2015 01-Sep-2020 01-Sep-2020 -- Due date for the DLI starts on May 1, 2019. The DLI number on the AF PAD is DLI 7. Comments ►DLI 10 DLI 8.1 and 8.2 Establishment of a government system for benchmarking Woreda PFM performance (Outcome, 21,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value N/A Completed Completed -- Date 16-Dec-2015 01-Sep-2020 01-Sep-2020 -- The next DLI due date is by May 1, 2019. The DLI number on the AF PAD is DLI 8 Comments ►DLI 11 DLI 8.3 An evaluation of the Woreda PFM Benchmarking Rating system is completed (Outcome, 10,500,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value No PFM benchmarking Completed Completed -- Date 01-Dec-2015 01-Sep-2020 01-Sep-2020 -- The due date for the DLI is November 1, 2019 Comments ►DLI 12 DLI 8.4 MOFEC/BoFED provides training for PFM capacity building to 20% of the Woreda finance and procurement staff in the 20% lowest performing woredas in each region, as assessed based on the Woreda (Outcome, 10,500,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value no data Completed Completed -- Date -- 01-Sep-2020 01-Sep-2020 -- The DLI is achieved well before the end date Comments ►DLI 13 DLI 8.5 Develop federal PFM reform strategy (Outcome, 5,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 DLI achieved as a PFM DLI achieved as a PFM Value No PFM strategy exists -- strategy was developed. strategy was developed. Date -- 01-Sep-2020 01-Sep-2020 -- 3/21/2024 Page 24 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Comments ►DLI 14 DLI8.6 All nine (9) regions and two (2) city administration adopt PFM reform strategy (Outcome, 5,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value No PFM strategy exists Acheived Acheived -- Date -- 01-Sep-2020 01-Sep-2020 -- Under verification Comments ►DLI 15 DLI 8.7 and 8.9 Improved results on below selected PFM indicators i) Cash Management and ii) Bank Reconciliation (Outcome, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Cash management score: DLR 8.7 is under review Value 19%; Bank reconciliation but data for DLR 8.9 is Completed -- score: 45% in EFY2009 not yet available Date -- 31-Aug-2021 31-Aug-2021 -- Due date for results on the DLI is on November 1, 2019. DLR 8.7 is under review but for DLR 8.9 data is not Comments yet available. ►DLI 16 DLI #8.8 Repeat benchmarking PFM evaluation (Outcome, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Operational guideline for PFM Woreda Value Data under review Completed -- benchmarking has been developed; Date -- 31-Aug-2021 31-Aug-2021 -- Under review Comments ►DLI 17 DLI 9 Oversight function of Regional Procurement regulatory bodies has been improved (Outcome, 12,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 This is DLR 9.6: This is DLR 9.6: Procurement Procurement performance performance is reported is reported by four regions by four regions (Amhara, (Amhara, Oromia, Oromia, SNNPR, Tigray) SNNPR, Tigray) based on based on KPIs on three KPIs on three basic Value N/A -- basic sectors sectors (agriculture, (agriculture, health, health, education) education) pertaining to pertaining to analyzed analyzed data for EFY data for EFY 2009. This is 2009. This is achieved. achieved. 3/21/2024 Page 25 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Date 16-Dec-2015 01-Sep-2020 01-Sep-2020 -- This is DLR 9.6: Procurement performance is reported by four regions (Amhara, Oromia, SNNPR, Tigray) based on KPIs on three basic sectors (agriculture, health, education) pertaining to analyzed data for EFY Comments 2009. This is achieved. ►DLI 18 DLI #9.6 and 9.7 Oversight function of Regional Procurement regulatory bodies has been improved (Intermediate Outcome, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Procurement performance monitoring guideline Value Acheived Acheived -- developed and data collection started EFY2009 Date -- 01-Sep-2020 01-Sep-2020 -- This is DLR 9.7: Procurement performance is reported by four regions (Amhara, Oromia, SNNPR, Tigray) based on KPIs on three basic sectors (agriculture, health, education) pertaining to analyzed data for EFY Comments 2010. This is achieved.Verified and disbursed ►DLI 19 DLI # 9.8: Oversight function of Regional Procurement regulatory bodies has been improved (Intermediate Outcome, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Procurement performance monitoring guideline Value Acheived Acheived -- developed and data collection started EFY2009 Date -- 01-Sep-2020 01-Sep-2020 -- Procurement data entry streamlined and continued to be collected based on KPIs on the three basic sectors Comments (agriculture, health, education) in the 9 regions. Due date for DLI is May 1, 2020. ►DLI 20 DLI # 9.9. Oversight function of Regional Procurement regulatory bodies has been improved (Intermediate Outcome, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Procurement performance monitoring guideline Value Achieved Achieved -- developed and data collection started EFY2009 Date -- 31-Aug-2021 31-Aug-2021 -- Due date for DLI is November 1, 2020. Comments ►DLI 21 DLI 10 Strengthened capacity of woredas to effectively respond to fraud and corruption complaints (Intermediate Outcome, 30,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Ethics officers are assigned Data no longer Data no longer Value in 179 Woredas in 2 -- monitoried. monitoried. regions 3/21/2024 Page 26 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Date 16-Dec-2015 01-Sep-2020 01-Sep-2020 -- This DLI was discontinued in the AF PAD. Comments ►DLI 22 DLI 10(b) 4: Strengthened capacity of Woreda Council finance and budget standing committee members to provide effective oversight, transparency and accountability for budgets (Intermediate Outcome, 5,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Training manual developed, 10% of Woredas received and reviewed audit report Value findings and followed up Under verification Completed -- recommendation through their Budget and Finance Standing Committee. Date -- 31-Aug-2021 31-Aug-2021 -- Under verification Comments ►DLI 23 DLI 10 (c) 1: Strengthened capacity of Woredas to effectively respond to F&C complaints including disaggregation of Data and decision on cases (Intermediate Outcome, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Record keeping is not IT- based and decision on Value Completed Completed -- cases are not regularly followed up Date -- 01-Sep-2020 01-Sep-2020 -- Verified and completed Comments ►DLI 24 DLI 11 Improved development information and data for service delivery (Intermediate Outcome, 45,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value N/A Reprogrammed Reprogrammed -- Date 16-Dec-2015 31-Aug-2021 31-Aug-2021 -- Reprogrammed and no longer monitored Comments ►DLI 25 DLI 11.6: Improved develpment information and data for service delivery (Intermediate Outcome, 15,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Last PHC conducted in Value Reprogrammed Reprogrammed -- 2007 Date -- 31-Aug-2021 31-Aug-2021 -- Comments This DLR is no longer monitored 3/21/2024 Page 27 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) ►DLI 26 DLI 12.1 Improve nutrition services (Intermediate Outcome, 50,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 The existing Woreda level nutrition coordination is not functioning well; frontline service providers are not adequately trained on The coordination platform The coordination platform nutrition BCC; 58% is in place in 158 is in place in 158 woredas Value -- mothers with children 0-23 woredas which is 52% of which is 52% of the 350 months have had contact the 350 woreda target woreda target with HEWs in the last 3 months as per the IFPRI Impact Assessment from January 2016 Date -- 01-Sep-2020 01-Sep-2020 -- This result is preliminary as of December 5, 2018. Final results may change depending on the verification Comments report. ►DLI 27 1a.1: At least 60% is allocated to basic services on average at regional level (excluding Addis Ababa) on average in the regional budgets for EFY2014 (Output, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 60.00 60.00 60.00 60.00 Date -- 30-Jun-2020 30-Jun-2020 -- Comments ►DLI 28 1a.2: At least 60% of regional budget (excluding Addis Ababa) on average is confirmed as spent on basic services in EFY2013 (Output, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 60.00 60.00 60.00 60.00 Date -- 30-Jun-2020 30-Jun-2020 -- Comments ►DLI 29 5c.1: A Health Extension Optimization Implementation Manual, with specific considerations for the pastoralist regions, to detail the implementation of the 2021 Health Extension Roadmap is approved (Process, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 No implementation manual No implementation Value Completed -- exists manual exists Date -- 01-Apr-2021 01-Apr-2021 -- 3/21/2024 Page 28 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Comments ►DLI 30 5c.2: 80% of the 408 existing PSNP woredas use the new methodology for mass-targeting of beneficiaries (Outcome, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 0.00 0.00 0.00 80.00 Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 31 5c.3: MOH provides integrated refresher training (IRT) on RMNCH module, as per the revised IRT manual and aligned with the 2021 Health Extension Roadmap, for 85% of HEW in selected regions (Outcome, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 0.00 0.00 0.00 85.00 Date -- 01-Apr-2021 01-Apr-2021 -- Completed Comments ►DLI 32 6.5: 350 woredas having ESIA system in place with an institutional setup, including human resources, and vets projects for their environmental and social impacts (Outcome, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 250.00 250.00 250.00 350.00 Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 33 7.13: 250 woredas publish Citizen Budget at woreda level for EFY2014 woreda budgets as per the agreed template (Outcome, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 0.00 0.00 0.00 250.00 Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 34 7.14: Federal and regional government institutionalizes dialogue on the civil society sector (Output, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 3/21/2024 Page 29 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Value 0.00 0.00 0.00 2.00 Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 35 8.10: Six (6) regional and two (2) city administration governments allocate agreed portion of their annual budget to implement PFM reforms of their PFM reform strategies (Output, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 For EFY 2014 the agreed allocation will be (a) 0.1% of their EFY 2013 budget for Amhara National Regional State, Southern Nations, Nationalities and Peoples Regional State, Somali National Regional Value 0.00 0.00 0.00 State, Benishangul Gumuz National Regional State, Gambella National Regional State, Addis Ababa City Administration, and Dire Dawa City Administration; and (b) 0.012% of EFY 2013 budget for Oromia National Regional State Date -- 01-Apr-2021 01-Apr-2021 -- Partially achieved. Comments ►DLI 36 8.11: 50% of woredas in select regions (a) conduct fixed asset count for EFY2013 (b) reconcile with records (fixed asset registers) and (c) report the same to BoFED (Output, 5,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 34.00 34.00 34.00 50.00 Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 37 9.10: Eight regions reported Procurement Performance to their respective BoFED heads for each of the five basic sectors based on agreed KPIs pertaining to EFY2013 data with key elements addressed (Output, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 3/21/2024 Page 30 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) Value 0.00 0.00 0.00 8.00 Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 38 9.11: Dire Dawa City Administration and Sidama Region commenced procurement data entry for five basic sectors based on agreed KPIs and furnished data captured in the first three quarters of EFY2014 (Output, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 0.00 0.00 0.00 2.00 Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 39 11.9: PDC, Ministry of Health and Ministry of Water Irrigation and Electricity implement the Digital MRS system (Output, 10,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value No pilots undertaken No pilots undertaken Achieved -- Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 40 13.2: Revised and validated two-year integrated functional and adult education IFAE program curriculum for one-year program endorsed by MoE (Output, 5,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Old IFAE curriculum Value Old IFAE curriculum Curriculum revised -- Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 41 13.3: 4% increase in the number of adults participating in the adult non-formal education program nationally in EFY2014 compared with the baseline in EFY2012 (Outcome, 15,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 2,870,000.00 2,870,000.00 2,870,000.00 3,000,000.00 Date -- 01-Apr-2021 01-Apr-2021 -- Comments 3/21/2024 Page 31 of 32 The World Bank Implementation Status & Results Report Enhancing Shared Prosperity through Equitable Services (P151432) ►DLI 42 15.2: 100 woredas establish functional WWT with at least 10 functional WaSHCOMs per woreda as per agreed definition of “functionality” (Outcome, 20,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 0.00 0.00 0.00 100.00 Date -- 01-Apr-2021 01-Apr-2021 -- Fully acheived Comments ►DLI 43 16.1: PDC prepared and published policy briefs on the demographic dividend and fertility (Output, 5,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Policy briefs Value No briefs published No briefs published No briefs published prepared and published Date -- 01-Apr-2021 01-Apr-2021 -- Comments ►DLI 44 16.2: A minimum of 300 health professionals deployed across the country are skilled with new strategies to support Gender Based Violence (GBV) survivors (Outcome, 15,000,000.00, 0%) Baseline Actual (Previous) Actual (Current) 2022 Value 0.00 0.00 0.00 300.00 Date -- 01-Apr-2021 01-Apr-2021 -- Achieved and fully disbursed. Comments 3/21/2024 Page 32 of 32