The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) Philippine Rural Development Project Scale-up (P180379) EAST ASIA AND PACIFIC | Philippines | Agriculture and Food Global Practice | IBRD/IDA | Investment Project Financing | FY 2023 | Seq No: 2 | ARCHIVED on 18-Mar-2024 | ISR59840 | Implementing Agencies: Department of Agriculture, Republic of the Philippines Key Dates Key Project Dates Bank Approval Date: 29-Jun-2023 Effectiveness Date: 23-Aug-2023 Planned Mid Term Review Date: 30-Jan-2026 Actual Mid-Term Review Date: Original Closing Date: 30-Jun-2029 Revised Closing Date: 30-Jun-2029 pdoTable Project Development Objectives Project Development Objective (from Project Appraisal Document) To improve farmers and fisherfolk access to markets and increase income from selected agri-fishery value chains Has the Project Development Objective been changed since Board Approval of the Project Objective? No Components Table Name Component 1: National and Local Level Planning Component (I-PLAN):(Cost $15.00 M) Component 2: Rural Infrastructure and Market Linkage Component (I-BUILD):(Cost $644.63 M) Component 3: Enterprise Development Component (I-REAP):(Cost $111.37 M) Component 4: Project Implementation Support Component (I-SUPPORT):(Cost $47.40 M) Component 5: Contingent Emergency Response Component (CERC) Overall Ratings Name Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Moderate Moderate Implementation Status and Key Decisions This ISR is based on the 1st Implementation Support Mission (ISM) carried out from November 7 to 22, 2023 and the subsequent monitoring of implementation progress of the Project from November to December 2023. The 1st ISM was done in conjunction with the 16th ISM for PRDP, and conducted site visits to some subprojects located in the South Luzon and Mindanao Clusters. The project is progressing well with preparatory activities. Component 1: National and Local Level Planning (I-PLAN). This component is progressing satisfactorily. The component will be initiating activities that support strategies to guide and evaluate: (a) the effectiveness of investments under the project; and (b) their contribution to the agri- fishery sectoral transformation goals of the PDP and NAFMIP. Component 2: Rural Infrastructure and Market Linkage (I-BUILD). This component is progressing Satisfactorily with a robust pipeline of 377 subprojects (SPs) of various types of infrastructure. Total cost of the pipeline SPs is PhP58.19 billion. 3/18/2024 Page 1 of 9 The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) Component 3: Enterprise Development (I-REAP). This component is progressing satisfactorily. Preparation of the PRDP-SU is progressing with 71 subprojects in the pipeline, of which 8 subprojects have passed the validation stage. Component 4: Project Implementation Support (I-SUPPORT). This component is progressing. satisfactorily. It supports project oversight, management, human resource development, fiduciary, M&E, knowledge management and execution of the Institutional Strengthening Action Plan (ISAP). A welcome development has been the establishment of an Institutional Development Unit (IDU) for institutional mainstreaming of PRDP’s innovations and approach within the DA. Risks Systematic Operations Risk-rating Tool Risk Category Rating at Approval Previous Rating Current Rating Political and Governance Moderate Moderate Moderate Macroeconomic Moderate Moderate Moderate Sector Strategies and Policies Moderate Moderate Moderate Technical Design of Project or Program Moderate Moderate Moderate Institutional Capacity for Implementation and Moderate Moderate Moderate Sustainability Fiduciary Substantial Substantial Moderate Environment and Social Substantial Substantial Substantial Stakeholders Moderate Moderate Moderate Other Moderate Moderate Moderate Overall Moderate Moderate Moderate Results PDO Indicators by Objectives / Outcomes Increased access to agricultural assets or services IN01399064 ►Farmers reached with agricultural assets or services (Number, Corporate) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 450,000.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 This indicator measures the number of farmers who were provided with agricultural assets or services as a result of World Bank project support. "Agriculture" or "Agricultural" includes: crops, livestock, capture Comments: fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property, biological assets, and farm and processing equipment. Biological assets may include animal agriculture breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber 3/18/2024 Page 2 of 9 The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers, pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto- sanitary and food safety services, agricultural marketing support services (e.g., price monitoring, export promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and drainage, and finance. Farmers are people engaged in agricultural activities or members of an agriculture- related business (disaggregated by men and women) targeted by the project. IN01399065 Farmers reached with agricultural assets or services - Female (Number, Corporate Supplement) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 225,000.00 Improved access to markets IN01399063 ►Percent increase in volumes of marketed output (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 40.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 The baseline in Yr 0 is 115,000 MT This indicator tracks the proportion of the produce marketed in raw Comments: form of the beneficiaries of infrastructure and enterprise development of the Project. by the end of the project, the project aims at 40 % increase over the baseline amounting to 161000 MT Increased income of farmers and fisherfolks IN01399062 ►Percent increase in farmers and fisherfolk income derived from commodities and product forms (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 The baseline income level is PhP 42,000. The project aims at 30 % increase over the baseline which is PhP55120 This indicator tracks changes in the real net on-farm and/or off-farm income of the beneficiaries Comments: directly attributable to infrastructure and enterprise development. Income increases will be averaged across commodities and product forms, using Year 0 figures as baseline. “Product forms” refer to processed commodities. Information will be reported in gender-disaggregated form, where available Intermediate Results Indicators by Components Component 1: National and Local Level Planning Component (I-PLAN) IN01399141 ►Percent increase in the amount of agri-fishery investments in PCIPs supporting priority value chains (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 30.00 3/18/2024 Page 3 of 9 The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline is zero. A baseline survey will be conducted to determine the agri--fishery investments. By mid- term, it is expected that half of the target would be achieved. Agri-fishery investments pertain to DA-wide Comments: financing to support value chain enhancements (investments) based on PCIPs. The percentage increase will be measured in terms of amount of investments in current prices. The results chain starts with PCIPs updated (immediate output) >> then PCIPs funded (immediate outcome). IN01399145 ►Number of Regional Agriculture and Fishery Investment Portfolio (RAFIP) utilized in the DA annual work plan (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 15.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 By mid-term, it is expected that half of the target would be achieved. The Regional Agriculture and Fisheries Investment Portfolio (RAFIP) would highlight PCIP multi-commodity and multi-provincial Comments: interventions in the region with potential for clustering and upscaling, based on regional analysis. The RAFIP will be integrated with the DA RFO Work and Financial Plan (WFP). IN01399149 ►Percent of DA and LGU participants with improved knowledge in investment planning (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 90.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline is zero. A baseline survey will be conducted to determine the level of knowledge. Baseline value is set zero as this measures the increment. By mid-term, it is expected that half of the target would be achieved. This indicator tracks the number of planning and program implementers (e.g. planners, budget Comments: and finance personnel, engineers, etc.) participating in “Ladderized training” (modular) on Investment planning including but not be limited to planning tools, VCA, eVSA, and PCIP. The participants will include non-PRDP personnel. Component 2: Rural Infrastructure and Market Linkage Component (I-BUILD) IN01399142 ►Percent reduction in transport costs in roads linking production areas to markets (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 4.50 0.00 0.00 3.15 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 The baseline is PhP 4.50/kg. The project aims to reduce the costs by 30 %, which is PhP 3.15/kg This Comments: measures the reduction in average transport cost of agri-fishery goods due to improved year-round/ climate-resilient connectivity between production areas to markets. IN01399146 ►Percent reduction in travel time of farmer/ fisherfolk from farm to market (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 10.00 0.00 0.00 6.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 3/18/2024 Page 4 of 9 The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) The baseline is 10 min/km. The project aims at 40 % reduction which is 6 min/km This measures the Comments: reduction in the average travel time of beneficiaries due to access to climate-resilient connectivity- enhancing infrastructure. Information will be reported in gender-disaggregated form, where available IN01399150 ►Cropping intensity in areas served with new/improved irrigation or drainage services (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 100.00 0.00 0.00 170.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline is 100 %. A baseline survey will be conducted to confirm the intensity. This measures the Comments: average increase in cropping intensity (i.e., effective area cultivated per year) served with new/improved irrigation by the Project. IN01399153 ►Percent of completed climate-smart value chain infrastructure facilities operating as designed (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 90.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved. This is defined as a percentage of total infrastructure sub-projects financed by the project. This indicator Comments: assesses the performance of completed project-financed infrastructure – based on PCIPs and RAFIPs – vis-à-vis standard criteria to include functionality and physical appearance. IN01399156 ►Kilometers of roads constructed (Kilometers, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 1,174.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Comments: Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved. IN01399158 ►Area served with new/rehabilitated irrigation system (Hectare(Ha), Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 2,517.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Comments: Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved. IN01399160 ►Number of value chain infrastructure facilities constructed as designed (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 62.00 3/18/2024 Page 5 of 9 The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Comments: Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved. Component 3: Enterprise Development Component (I-REAP) IN01399143 ►Percent of agri-fishery enterprises engaged in postproduction segments of value chains. (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 60.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline is zero/TBD. A baseline survey will be conducted to determine the baseline level. Baseline value is set zero as this measures the incremental change. By mid-term, it is expected that one-third of the target (20%) would be achieved. This is measured as a percentage of total agri-fishery enterprises participating in project. The Philippine Development Plan 2023-2028 highlights lack of post-harvest Comments: facilities as one bottleneck to food security. I-REAP subprojects will strengthen common service facilities, e.g., to process raw produce. In this regard, this indicator tracks the extent to which enterprises are shifting away from purely production ventures, and diversifying towards higher-income, value-adding products forms. IN01399147 ►Percent increase in profitability of participating agri-fishery enterprises (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 40.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline value is set TBD/zero as this measures incremental changes. Once the baseline survey is conducted, baseline value will be updated. By mid-term, it is expected that one-third of the target (13%) would be achieved. This indicator tracks returns to investment. While “profit” refers to a peso amount, Comments: "profitability” is understood to mean sustained annual increases in enterprise net profit resulting from PRDP business models, rather than seasonal/ fluctuating increases. Profitability is affected by factors such as the enterprise’s productivity, operational efficiency, and expenses; and external factors such as market demand and competition. IN01399151 ►Percent of agri-fishery enterprise clusters reached by business development support including credit and insurance (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline is set zero as this measures incremental changes. A baseline survey will be conducted. By mid- Comments: term, it is expected that one-third of the target (17%) would be achieved. The indicator defines the enterprises linked with technical and business development support service providers and institutions. IN01399154 ►Percent of agri-fishery enterprise clusters with partnership agreement with institutional buyers (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 3/18/2024 Page 6 of 9 The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline is zero, as this measures incremental changes as a result of project interventions. By mid-term, it Comments: is expected that one-third of the target (17%) would be achieved. This measures the agri-fishery linked to institutional buyers through either formal agreements, i.e., through contracts, purchase orders, etc. IN01399157 ►Percent of women directly participating in clustered enterprises (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 50.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Baseline is zero, as this measures incremental changes as result of interventions. By mid-term, it is expected that one-third of the target (17%) would be achieved. This is measured as a percentage of total Comments: number of women participating in the project. This indicator measures the degree to which women participate actively – and benefit from – targeted value chain segments (e.g., processing, marketing) at the enterprise level. IN01399159 ►Number of agri-fishery enterprises (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 110.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 Of the target of 110 enterprises, 50 are small enterprises, 50 are medium enterprises, and 10 are large Comments: enterprises. Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved. Component 4: Project Implementation Support Component (I-SUPPORT) IN01399144 ►Number of institutionalized PRDP innovations including climate-smart technologies within the DA (Number, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 10.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 This indicator counts the number of innovations (e.g., climate-resilient value chain analysis) adopted in Comments: regular DA programs. By mid-term it is expected that half of the target would be achieved IN01399148 ►Enhanced Project’s M&E system incorporating knowledge management (Yes/No, Custom) Baseline Actual (Previous) Actual (Current) End Target Value No No No Yes Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 This indicator tracks the enhancement (or improvement) of the project M&E system by integrating Knowledge Management, which results to a Monitoring, Evaluation and Learning (MEL) System, aimed at Comments: leveraging learning supported by properly collected, managed, and analyzed data to improve decision- making and promote replication of good practices. 3/18/2024 Page 7 of 9 The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) IN01399152 ►Percent of grievances registered in the project's grievance redress system addressed (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 90.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 This measures the project’s response rate based on the Grievance Redress Mechanism (GRM) database. Comments: By mid-term, it is expected that one-third of the target (30%) would be achieved. IN01399155 ►Percent of producers satisfied with adequacy of access to postharvest services and facilities (Percentage, Custom) Baseline Actual (Previous) Actual (Current) End Target Value 0.00 0.00 0.00 80.00 Date 01-Jul-2023 21-Sep-2023 31-Dec-2023 30-Jun-2029 By mid-term, it is expected that one-third of the target (27%) would be achieved. This indicator seeks to draw out perceptions of farmers and fisherfolk about how the project is improving their access to services Comments: and facilities and thus enabling them to improve income and market access. Information will be reported in gender-disaggregated form, where available Performance-Based Conditions Data on Financial Performance Disbursements (by loan) Project Loan/Credit/TF Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P180379 IBRD-95770 Effective USD 600.00 600.00 0.00 26.23 573.77 4.4% Key Dates (by loan) Project Loan/Credit/TF Status Approval Date Signing Date Effectiveness Date Orig. Closing Date Rev. Closing Date P180379 IBRD-95770 Effective 29-Jun-2023 07-Jul-2023 23-Aug-2023 30-Jun-2029 30-Jun-2029 Cumulative Disbursements 3/18/2024 Page 8 of 9 The World Bank Implementation Status & Results Report Philippine Rural Development Project Scale-up (P180379) Restructuring History There has been no restructuring to date. Related Project(s) There are no related projects. 3/18/2024 Page 9 of 9