The World Bank                                                                                        Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)



Philippine Rural Development Project Scale-up (P180379)


 EAST ASIA AND PACIFIC | Philippines | Agriculture and Food Global Practice |
 IBRD/IDA | Investment Project Financing | FY 2023 | Seq No: 2 | ARCHIVED on 18-Mar-2024 | ISR59840 |


 Implementing Agencies: Department of Agriculture, Republic of the Philippines



 Key Dates


  Key Project Dates

   Bank Approval Date: 29-Jun-2023                                                Effectiveness Date: 23-Aug-2023
   Planned Mid Term Review Date: 30-Jan-2026                                      Actual Mid-Term Review Date:
   Original Closing Date: 30-Jun-2029                                             Revised Closing Date: 30-Jun-2029
 pdoTable

 Project Development Objectives

  Project Development Objective (from Project Appraisal Document)
  To improve farmers and fisherfolk access to markets and increase income from selected agri-fishery value chains

  Has the Project Development Objective been changed since Board Approval of the Project Objective?
  No


 Components Table

 Name
 Component 1: National and Local Level Planning Component (I-PLAN):(Cost $15.00 M)
 Component 2: Rural Infrastructure and Market Linkage Component (I-BUILD):(Cost $644.63 M)
 Component 3: Enterprise Development Component (I-REAP):(Cost $111.37 M)
 Component 4: Project Implementation Support Component (I-SUPPORT):(Cost $47.40 M)
 Component 5: Contingent Emergency Response Component (CERC)

 Overall Ratings

 Name                                                                           Previous Rating                            Current Rating

 Progress towards achievement of PDO                                            Satisfactory                              Satisfactory
 Overall Implementation Progress (IP)                                           Satisfactory                              Satisfactory
 Overall Risk Rating                                                            Moderate                                  Moderate


 Implementation Status and Key Decisions

  This ISR is based on the 1st Implementation Support Mission (ISM) carried out from November 7 to 22, 2023 and the subsequent monitoring
  of implementation progress of the Project from November to December 2023. The 1st ISM was done in conjunction with the 16th ISM for PRDP,
  and conducted site visits to some subprojects located in the South Luzon and Mindanao Clusters.
  The project is progressing well with preparatory activities.
  Component 1: National and Local Level Planning (I-PLAN). This component is progressing satisfactorily. The component will be initiating
  activities that support strategies to guide and evaluate: (a) the effectiveness of investments under the project; and (b) their contribution to the agri-
  fishery sectoral transformation goals of the PDP and NAFMIP.
  Component 2: Rural Infrastructure and Market Linkage (I-BUILD). This component is progressing Satisfactorily with a robust pipeline of 377
  subprojects (SPs) of various types of infrastructure. Total cost of the pipeline SPs is PhP58.19 billion.


3/18/2024                                                                                                                           Page 1 of 9
            The World Bank                                                                                        Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)



  Component 3: Enterprise Development (I-REAP). This component is progressing satisfactorily. Preparation of the PRDP-SU is progressing with
  71 subprojects in the pipeline, of which 8 subprojects have passed the validation stage.
  Component 4: Project Implementation Support (I-SUPPORT). This component is progressing. satisfactorily. It supports project oversight,
  management, human resource development, fiduciary, M&E, knowledge management and execution of the Institutional Strengthening Action Plan
  (ISAP). A welcome development has been the establishment of an Institutional Development Unit (IDU) for institutional mainstreaming of PRDP’s
  innovations and approach within the DA.




  Risks


 Systematic Operations Risk-rating Tool


  Risk Category                                               Rating at Approval                Previous Rating               Current Rating

  Political and Governance                                    Moderate                         Moderate                     Moderate
  Macroeconomic                                               Moderate                         Moderate                     Moderate
  Sector Strategies and Policies                              Moderate                         Moderate                     Moderate
  Technical Design of Project or Program                      Moderate                         Moderate                     Moderate
  Institutional Capacity for Implementation and
                                                              Moderate                         Moderate                     Moderate
  Sustainability
  Fiduciary                                                   Substantial                      Substantial                  Moderate
  Environment and Social                                      Substantial                      Substantial                  Substantial
  Stakeholders                                                Moderate                         Moderate                     Moderate
  Other                                                       Moderate                         Moderate                     Moderate
  Overall                                                     Moderate                         Moderate                     Moderate



  Results


 PDO Indicators by Objectives / Outcomes



   Increased access to agricultural assets or services

    IN01399064
    ►Farmers reached with agricultural assets or services (Number, Corporate)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target

    Value                              0.00                         0.00                           0.00                       450,000.00

    Date                               01-Jul-2023                  21-Sep-2023                    31-Dec-2023                30-Jun-2029
                                       This indicator measures the number of farmers who were provided with agricultural assets or services as
                                       a result of World Bank project support. "Agriculture" or "Agricultural" includes: crops, livestock, capture
   Comments:                           fisheries, aquaculture, agroforestry, timber, and non-timber forest products. Assets include property,
                                       biological assets, and farm and processing equipment. Biological assets may include animal agriculture
                                       breeds (e.g., livestock, fisheries) and genetic material of livestock, crops, trees, and shrubs (including fiber


3/18/2024                                                                                                                         Page 2 of 9
            The World Bank                                                                                      Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)



                                       and fuel crops). Services include research, extension, training, education, ICTs, inputs (e.g., fertilizers,
                                       pesticides, labor), production-related services (e.g., soil testing, animal health/veterinary services), phyto-
                                       sanitary and food safety services, agricultural marketing support services (e.g., price monitoring, export
                                       promotion), access to farm and post-harvest machinery and storage facilities, employment, irrigation and
                                       drainage, and finance. Farmers are people engaged in agricultural activities or members of an agriculture-
                                       related business (disaggregated by men and women) targeted by the project.
     IN01399065
     Farmers reached with agricultural assets or services - Female (Number, Corporate Supplement)

                                     Baseline                      Actual (Previous)             Actual (Current)            End Target

     Value                           0.00                         0.00                           0.00                        225,000.00


   Improved access to markets

    IN01399063
    ►Percent increase in volumes of marketed output (Percentage, Custom)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target

    Value                              0.00                         0.00                          0.00                        40.00

    Date                               01-Jul-2023                  21-Sep-2023                   31-Dec-2023                 30-Jun-2029
                                       The baseline in Yr 0 is 115,000 MT This indicator tracks the proportion of the produce marketed in raw
   Comments:                           form of the beneficiaries of infrastructure and enterprise development of the Project. by the end of the
                                       project, the project aims at 40 % increase over the baseline amounting to 161000 MT


   Increased income of farmers and fisherfolks

    IN01399062
    ►Percent increase in farmers and fisherfolk income derived from commodities and product forms (Percentage, Custom)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target

    Value                              0.00                         0.00                          0.00                        30.00

    Date                               01-Jul-2023                  21-Sep-2023                   31-Dec-2023                 30-Jun-2029
                                       The baseline income level is PhP 42,000. The project aims at 30 % increase over the baseline which is
                                       PhP55120 This indicator tracks changes in the real net on-farm and/or off-farm income of the beneficiaries
   Comments:                           directly attributable to infrastructure and enterprise development. Income increases will be averaged
                                       across commodities and product forms, using Year 0 figures as baseline. “Product forms” refer to
                                       processed commodities. Information will be reported in gender-disaggregated form, where available


 Intermediate Results Indicators by Components



   Component 1: National and Local Level Planning Component (I-PLAN)

    IN01399141
    ►Percent increase in the amount of agri-fishery investments in PCIPs supporting priority value chains (Percentage, Custom)

                                       Baseline                     Actual (Previous)              Actual (Current)           End Target

    Value                              0.00                         0.00                          0.00                        30.00



3/18/2024                                                                                                                        Page 3 of 9
            The World Bank                                                                                     Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)




    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       Baseline is zero. A baseline survey will be conducted to determine the agri--fishery investments. By mid-
                                       term, it is expected that half of the target would be achieved. Agri-fishery investments pertain to DA-wide
   Comments:                           financing to support value chain enhancements (investments) based on PCIPs. The percentage increase
                                       will be measured in terms of amount of investments in current prices. The results chain starts with PCIPs
                                       updated (immediate output) >> then PCIPs funded (immediate outcome).
    IN01399145
    ►Number of Regional Agriculture and Fishery Investment Portfolio (RAFIP) utilized in the DA annual work plan (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       15.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       By mid-term, it is expected that half of the target would be achieved. The Regional Agriculture and
                                       Fisheries Investment Portfolio (RAFIP) would highlight PCIP multi-commodity and multi-provincial
   Comments:
                                       interventions in the region with potential for clustering and upscaling, based on regional analysis. The
                                       RAFIP will be integrated with the DA RFO Work and Financial Plan (WFP).
    IN01399149
    ►Percent of DA and LGU participants with improved knowledge in investment planning (Percentage, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       90.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       Baseline is zero. A baseline survey will be conducted to determine the level of knowledge. Baseline value
                                       is set zero as this measures the increment. By mid-term, it is expected that half of the target would be
                                       achieved. This indicator tracks the number of planning and program implementers (e.g. planners, budget
   Comments:
                                       and finance personnel, engineers, etc.) participating in “Ladderized training” (modular) on Investment
                                       planning including but not be limited to planning tools, VCA, eVSA, and PCIP. The participants will include
                                       non-PRDP personnel.


   Component 2: Rural Infrastructure and Market Linkage Component (I-BUILD)

    IN01399142
    ►Percent reduction in transport costs in roads linking production areas to markets (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              4.50                        0.00                          0.00                       3.15

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       The baseline is PhP 4.50/kg. The project aims to reduce the costs by 30 %, which is PhP 3.15/kg This
   Comments:                           measures the reduction in average transport cost of agri-fishery goods due to improved year-round/
                                       climate-resilient connectivity between production areas to markets.
    IN01399146
    ►Percent reduction in travel time of farmer/ fisherfolk from farm to market (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              10.00                       0.00                          0.00                       6.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029


3/18/2024                                                                                                                       Page 4 of 9
            The World Bank                                                                                     Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)



                                       The baseline is 10 min/km. The project aims at 40 % reduction which is 6 min/km This measures the
   Comments:                           reduction in the average travel time of beneficiaries due to access to climate-resilient connectivity-
                                       enhancing infrastructure. Information will be reported in gender-disaggregated form, where available
    IN01399150
    ►Cropping intensity in areas served with new/improved irrigation or drainage services (Percentage, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              100.00                      0.00                          0.00                       170.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       Baseline is 100 %. A baseline survey will be conducted to confirm the intensity. This measures the
   Comments:                           average increase in cropping intensity (i.e., effective area cultivated per year) served with new/improved
                                       irrigation by the Project.
    IN01399153
    ►Percent of completed climate-smart value chain infrastructure facilities operating as designed (Percentage, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       90.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved. This is
                                       defined as a percentage of total infrastructure sub-projects financed by the project. This indicator
   Comments:
                                       assesses the performance of completed project-financed infrastructure – based on PCIPs and RAFIPs –
                                       vis-à-vis standard criteria to include functionality and physical appearance.
    IN01399156
    ►Kilometers of roads constructed (Kilometers, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       1,174.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029

   Comments:                           Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved.

    IN01399158
    ►Area served with new/rehabilitated irrigation system (Hectare(Ha), Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       2,517.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029

   Comments:                           Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved.

    IN01399160
    ►Number of value chain infrastructure facilities constructed as designed (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       62.00




3/18/2024                                                                                                                      Page 5 of 9
            The World Bank                                                                                      Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)




    Date                               01-Jul-2023                  21-Sep-2023                   31-Dec-2023               30-Jun-2029

   Comments:                           Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be achieved.



   Component 3: Enterprise Development Component (I-REAP)

    IN01399143
    ►Percent of agri-fishery enterprises engaged in postproduction segments of value chains. (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              0.00                         0.00                          0.00                      60.00

    Date                               01-Jul-2023                  21-Sep-2023                   31-Dec-2023               30-Jun-2029
                                       Baseline is zero/TBD. A baseline survey will be conducted to determine the baseline level. Baseline value
                                       is set zero as this measures the incremental change. By mid-term, it is expected that one-third of the
                                       target (20%) would be achieved. This is measured as a percentage of total agri-fishery enterprises
                                       participating in project. The Philippine Development Plan 2023-2028 highlights lack of post-harvest
   Comments:
                                       facilities as one bottleneck to food security. I-REAP subprojects will strengthen common service facilities,
                                       e.g., to process raw produce. In this regard, this indicator tracks the extent to which enterprises are
                                       shifting away from purely production ventures, and diversifying towards higher-income, value-adding
                                       products forms.
    IN01399147
    ►Percent increase in profitability of participating agri-fishery enterprises (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              0.00                         0.00                          0.00                      40.00

    Date                               01-Jul-2023                  21-Sep-2023                   31-Dec-2023               30-Jun-2029
                                       Baseline value is set TBD/zero as this measures incremental changes. Once the baseline survey is
                                       conducted, baseline value will be updated. By mid-term, it is expected that one-third of the target (13%)
                                       would be achieved. This indicator tracks returns to investment. While “profit” refers to a peso amount,
   Comments:                           "profitability” is understood to mean sustained annual increases in enterprise net profit resulting from
                                       PRDP business models, rather than seasonal/ fluctuating increases. Profitability is affected by factors
                                       such as the enterprise’s productivity, operational efficiency, and expenses; and external factors such as
                                       market demand and competition.
    IN01399151
    ►Percent of agri-fishery enterprise clusters reached by business development support including credit and insurance (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              0.00                         0.00                          0.00                      50.00

    Date                               01-Jul-2023                  21-Sep-2023                   31-Dec-2023               30-Jun-2029
                                       Baseline is set zero as this measures incremental changes. A baseline survey will be conducted. By mid-
   Comments:                           term, it is expected that one-third of the target (17%) would be achieved. The indicator defines the
                                       enterprises linked with technical and business development support service providers and institutions.
    IN01399154
    ►Percent of agri-fishery enterprise clusters with partnership agreement with institutional buyers (Percentage, Custom)

                                       Baseline                     Actual (Previous)             Actual (Current)          End Target

    Value                              0.00                         0.00                          0.00                      50.00


3/18/2024                                                                                                                      Page 6 of 9
            The World Bank                                                                                     Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)




    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       Baseline is zero, as this measures incremental changes as a result of project interventions. By mid-term, it
   Comments:                           is expected that one-third of the target (17%) would be achieved. This measures the agri-fishery linked to
                                       institutional buyers through either formal agreements, i.e., through contracts, purchase orders, etc.
    IN01399157
    ►Percent of women directly participating in clustered enterprises (Percentage, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       50.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       Baseline is zero, as this measures incremental changes as result of interventions. By mid-term, it is
                                       expected that one-third of the target (17%) would be achieved. This is measured as a percentage of total
   Comments:                           number of women participating in the project. This indicator measures the degree to which women
                                       participate actively – and benefit from – targeted value chain segments (e.g., processing, marketing) at
                                       the enterprise level.
    IN01399159
    ►Number of agri-fishery enterprises (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       110.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       Of the target of 110 enterprises, 50 are small enterprises, 50 are medium enterprises, and 10 are large
   Comments:                           enterprises. Baseline is zero. By mid-term, it is expected that one-third of the target (30%) would be
                                       achieved.


   Component 4: Project Implementation Support Component (I-SUPPORT)

    IN01399144
    ►Number of institutionalized PRDP innovations including climate-smart technologies within the DA (Number, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              0.00                        0.00                          0.00                       10.00

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029

                                       This indicator counts the number of innovations (e.g., climate-resilient value chain analysis) adopted in
   Comments:
                                       regular DA programs. By mid-term it is expected that half of the target would be achieved
    IN01399148
    ►Enhanced Project’s M&E system incorporating knowledge management (Yes/No, Custom)

                                       Baseline                    Actual (Previous)             Actual (Current)           End Target

    Value                              No                          No                            No                         Yes

    Date                               01-Jul-2023                 21-Sep-2023                   31-Dec-2023                30-Jun-2029
                                       This indicator tracks the enhancement (or improvement) of the project M&E system by integrating
                                       Knowledge Management, which results to a Monitoring, Evaluation and Learning (MEL) System, aimed at
   Comments:
                                       leveraging learning supported by properly collected, managed, and analyzed data to improve decision-
                                       making and promote replication of good practices.



3/18/2024                                                                                                                      Page 7 of 9
            The World Bank                                                                                         Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)



    IN01399152
    ►Percent of grievances registered in the project's grievance redress system addressed (Percentage, Custom)

                                       Baseline                      Actual (Previous)               Actual (Current)          End Target

    Value                              0.00                         0.00                             0.00                      90.00

    Date                               01-Jul-2023                  21-Sep-2023                      31-Dec-2023              30-Jun-2029

                                       This measures the project’s response rate based on the Grievance Redress Mechanism (GRM) database.
   Comments:
                                       By mid-term, it is expected that one-third of the target (30%) would be achieved.
    IN01399155
    ►Percent of producers satisfied with adequacy of access to postharvest services and facilities (Percentage, Custom)

                                       Baseline                      Actual (Previous)               Actual (Current)          End Target

    Value                              0.00                         0.00                             0.00                      80.00

    Date                               01-Jul-2023                  21-Sep-2023                      31-Dec-2023              30-Jun-2029
                                       By mid-term, it is expected that one-third of the target (27%) would be achieved. This indicator seeks to
                                       draw out perceptions of farmers and fisherfolk about how the project is improving their access to services
   Comments:
                                       and facilities and thus enabling them to improve income and market access. Information will be reported in
                                       gender-disaggregated form, where available


 Performance-Based Conditions



 Data on Financial Performance


 Disbursements (by loan)

 Project        Loan/Credit/TF    Status       Currency        Original    Revised       Cancelled      Disbursed       Undisbursed               % Disbursed


 P180379        IBRD-95770        Effective    USD             600.00       600.00            0.00          26.23            573.77                     4.4%


 Key Dates (by loan)

 Project         Loan/Credit/TF    Status      Approval Date       Signing Date      Effectiveness Date        Orig. Closing Date      Rev. Closing Date

 P180379         IBRD-95770        Effective   29-Jun-2023         07-Jul-2023       23-Aug-2023               30-Jun-2029             30-Jun-2029


Cumulative Disbursements




3/18/2024                                                                                                                           Page 8 of 9
            The World Bank                                            Implementation Status & Results Report
            Philippine Rural Development Project Scale-up (P180379)




  Restructuring History


  There has been no restructuring to date.


  Related Project(s)


 There are no related projects.




3/18/2024                                                                            Page 9 of 9