BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN CORAL REEF REHABILITATION AND MANAGEMENT PROGRAM CORAL TRIANGLE INITIATIVE (COREMAP - CTI) PROJECT IBRD LOAN NOMOR 8336-ID TAHUN 2021 PADA BA 079 LEMBAGA ILMU PENGETAHUAN INDONESIA DI BADAN RISET DAN INOVASI NASIONAL DI DKI JAKARTA DAN NUSA TENGGARA BARAT AUDITORAT UTAMA KEUANGAN NEGARA III JAKARTA Nomor :88A/LHP/XVI/07/2022 Tanggal : 8 Juli 2022 BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN CORAL REEF REHABILITATION AND MANAGEMENT PROGRAM CORAL TRIANGLE INITIATIVE (COREMAP - CTI) PROJECT IBRD LOAN NOMOR 8336-ID TAHUN 2021 PADA BA 079 LEMBAGA ILMU PENGETAHUAN INDONESIA DI BADAN RISET DAN INOVASI NASIONAL DI DKI JAKARTA DAN NUSA TENGGARA BARAT AUDITORAT UTAMA KEUANGAN NEGARA III Nomor : 88A/LHP/XVI/07/2022 Tanggal : 8 Juli 2022 BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA Jl. Gatot Subroto Nomor 31 Jakarta Pusat 10210 Telp. (021) 25549000 Eks. 3562 Faks. (021) 5700501 SISTEMATIKA LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN COREMAP-CTI PROJECT IBRD LOAN NO. 8336-ID BA 079 LEMBAGA ILMU PENGETAHUAN INDONESIA (LIPI) DI BADAN RISET DAN INOVASI NASIONAL (BRIN) TAHUN 2021 Hasil pemeriksaan Laporan Keuangan Coral Reef Rehabilitation and Management Program Coral Triangle Initiative (Coremap-CTI) Project IBRD Loan No. 8336-ID BA 079 LIPI di BRIN Tahun 2021 terdiri dari dua buku, yaitu: 1. Buku I: Laporan Hasil Pemeriksaan atas Laporan Keuangan Buku I memuat: a. Laporan hasil pemeriksaan yang memuat opini BPK. b. Gambaran Umum Pemeriksaan yang berisi dasar hukum pemeriksaan, standar pemeriksaan, tujuan pemeriksaan, entitas yang diperiksa, lingkup pemeriksaan, sasaran pemeriksaan, metodologi pemeriksaan, jangka waktu pemeriksaan, dan batasan pemeriksaan. c. Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID BA 079 LIPI di BRIN Tahun 2021. 2. Buku II: Laporan Hasil Pemeriksaan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Ketentuan Peraturan Perundang-undangan Buku II memuat: a. Resume Laporan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Ketentuan Peraturan Perundang-undangan. b. Hasil Pemeriksaan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Ketentuan Peraturan Perundang-undangan. c. Hasil Pemantauan Tindak Lanjut Pemeriksaan atas Sistem Pengendalian Intern dan Kepatuhan terhadap Ketentuan Peraturan Perundang-undangan Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2017-2020. i DAFTAR ISI Halaman SISTEMATIKA LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN COREMAP-CTI PROJECT IBRD LOAN NO. 8336-ID LEMBAGA ILMU PENGETAHUAN INDONESIA (LIPI) BA 079 DI BADAN RISET DAN INOVASI NASIONAL (BRIN) TAHUN 2021 …………………………………………………………………………... i DAFTAR ISI .................................................................................................... ii LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN COREMAP-CTI PROJECT IBRD LOAN No. 8336-ID TAHUN 2021 ....... 1 GAMBARAN UMUM PEMERIKSAAN ...................................................... 4 LAPORAN KEUANGAN COREMAP-CTI PROJECT IBRD LOAN No. 8336-ID LIPI BA 079 DI BRIN TAHUN 2021 …………………………….. 9 CATATAN ATAS LAPORAN KEUANGAN................................................ 9 ii BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA LAPORAN HASIL PEMERIKSAAN ATAS LAPORAN KEUANGAN Laporan atas Laporan Keuangan Berdasarkan Undang-Undang Nomor 15 Tahun 2004 tentang Pemeriksaan Pengelolaan dan Tanggung Jawab Keuangan Negara dan Undang-Undang Nomor 15 Tahun 2006 tentang Badan Pemeriksa Keuangan, Badan Pemeriksa Keuangan (BPK) telah memeriksa Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021 yang disusun oleh Deputi Bidang Ilmu Pengetahuan Kebumian (IPK) BA 079 LIPI di BRIN selaku Project Management Office (PMO). Laporan Keuangan tersebut merupakan laporan keuangan bertujuan khusus berupa Cumulative Project Expenditure and Financing, Actual Project Expenditure and Financing, Project Sources and Uses of Funds, Project Uses of Funds by Category, Summary Sheet of Payment of Contract Subject to Prior Review, Summary Statement of Expenditures, Designated/Special Account Activity Statement untuk tahun yang berakhir 31 Desember 2021, serta Catatan atas Laporan Keuangan. Laporan Keuangan tersebut disusun oleh executing agency dengan tujuan untuk memenuhi ketentuan Schedule 2 Section II.B.3 dari Amended and Restated Loan Agreement antara International Bank for Reconstruction and Development (IBRD) dengan Pemerintah Indonesia. Tanggung Jawab Pemerintah atas Laporan Keuangan BRIN bertanggung jawab atas penyusunan dan penyajian laporan keuangan sesuai dengan klausul pelaporan yang tercantum pada Schedule 2 Section II.B.3 dari Amended and Restated Loan Agreement serta ketentuan teknis terkait dan pengendalian intern yang memadai untuk menyusun laporan keuangan yang bebas dari kesalahan penyajian material, baik yang disebabkan oleh kecurangan maupun kesalahan. Tanggung Jawab BPK Tanggung jawab BPK adalah untuk menyatakan suatu opini atas laporan keuangan berdasarkan pemeriksaan BPK. BPK melaksanakan pemeriksaan berdasarkan Standar Pemeriksaan Keuangan Negara. Standar tersebut mengharuskan BPK mematuhi kode etik BPK, serta merencanakan dan melaksanakan pemeriksaan untuk memperoleh keyakinan yang memadai apakah laporan keuangan tersebut bebas dari kesalahan penyajian material. BPK. LHP LK Coremap-CTI Project IBRD Loan No. 8336 - ID Tahun 2021 1 Suatu pemeriksaan meliputi pengujian bukti-bukti yang mendukung angka-angka dan pengungkapan dalam laporan keuangan. Prosedur yang dipilih mendasarkan pada pertimbangan profesional Pemeriksa, termasuk penilaian risiko salah saji yang material dalam laporan keuangan, baik yang disebabkan oleh kecurangan maupun kesalahan. Dalam melakukan penilaian risiko, Pemeriksa mempertimbangkan pengendalian intern yang relevan dengan penyusunan dan penyajian wajar laporan keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021 untuk merancang prosedur pemeriksaan yang tepat sesuai dengan kondisi yang ada, tetapi bukan untuk tujuan menyatakan opini atas efektivitas pengendalian intern Coremap - CTI Project IBRD Loan No. 8336-ID Tahun 2021. Pemeriksaan yang dilakukan BPK juga mencakup evaluasi atas ketepatan kebijakan akuntansi yang digunakan dan kewajaran estimasi akuntansi yang dibuat oleh Deputi Bidang IPK BA 079 LIPI di BRIN, serta evaluasi atas penyajian laporan keuangan secara keseluruhan. BPK yakin bahwa bukti pemeriksaan yang telah diperoleh adalah cukup dan tepat, sebagai dasar untuk menyatakan opini BPK. Opini Menurut opini BPK, laporan keuangan bertujuan khusus yang disebut di atas, menyajikan secara wajar, dalam semua hal yang material, Cumulative Project Expenditure and Financing, Actual Project Expenditure and Financing, Project Sources and Uses of Funds, Project Uses of Funds by Category, Summary Sheet of Payment of Contract Subject to Prior Review, Summary Statement of Expenditures, Designated/Special Account Activity Statement untuk tahun yang berakhir 31 Desember 2021, sesuai dengan kerangka pelaporan yang tercantum pada Schedule 2 Section II.B.3 dari Amended and Restated Loan Agreement serta ketentuan teknis yang terkait. Basis Akuntansi Tanpa memodifikasi opini, BPK menekankan pada Catatan Nomor 2.3 yang menjelaskan tentang Kebijakan Akuntansi Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID. Laporan keuangan bertujuan khusus atas Coremap-CTI Project IBRD Loan No. 8336-ID disusun dengan tujuan untuk memenuhi ketentuan Schedule 2 Section II.B.3 dari Amended and Restated Loan Agreement antara IBRD dengan Pemerintah Indonesia. Sebagai akibatnya, laporan keuangan ini belum tentu cocok untuk tujuan lain. Hal Lain Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021 dikelola oleh Deputi Bidang IPK BA 079 LIPI di BRIN dengan mekanisme pengelolaan pendapatan dan belanja APBN serta telah dilaporkan dalam Laporan Keuangan BA 079 LIPI di BRIN. BA 079 LIPI di BRIN telah menyusun satu set laporan keuangan terpisah untuk tahun yang berakhir pada tanggal 31 Desember 2021 sesuai dengan Standar Akuntansi Pemerintahan dan atas laporan keuangan tersebut BPK telah menerbitkan Laporan Hasil Pemeriksaan Nomor 77A/LHP/XVI/05/2022 tanggal 27 Mei 2022 yang diterbitkan secara terpisah. BPK. LHP LK Coremap-CTI Project IBRD Loan No. 8336 - ID Tahun 2021 2 GAMBARAN UMUM PEMERIKSAAN 1. Dasar Hukum Pemeriksaan a. Undang-Undang Nomor 17 Tahun 2003 tentang Keuangan Negara. b. Undang-Undang Nomor 1 Tahun 2004 tentang Perbendaharaan Negara. c. Undang-Undang Nomor 15 Tahun 2004 tentang Pemeriksaan Pengelolaan dan Tanggung Jawab Keuangan Negara. d. Undang-Undang Nomor 15 Tahun 2006 tentang Badan Pemeriksa Keuangan. e. Amendment to the Amended and Restated Loan Agreement Coral Reef Rehabilitation and Management Program – Coral Triangle Initiative (Coremap- CTI) project between Republic Of Indonesia and International Bank for Reconstruction and Development (IBRD) Nomor 8336-ID Schedule 2 Section II.B, tanggal 19 Juni 2019. 2. Standar Pemeriksaan Pemeriksaan atas Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336- ID Tahun 2021 pada BA 079 LIPI di BRIN menggunakan standar pemeriksaan sebagai berikut: a. Peraturan BPK Nomor 1 Tahun 2017 tentang Standar Pemeriksaan Keuangan Negara (SPKN) Tahun 2017; b. Panduan Manajemen Pemeriksaan (PMP) 2015; c. World Bank Disbursement Guidelines for Projects. 3. Tujuan Pemeriksaan Pemeriksaan atas Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336- ID Tahun 2021 bertujuan untuk memberikan opini Laporan Keuangan per 31 Desember 2021. Pemberian opini dengan mempertimbangkan: a. Penilaian atas Sistem Pengendalian Intern dan kesesuaiannya dengan standar akuntansi yang berlaku umum berkaitan dengan pengeluaran dan transaksi lainnya termasuk dalam pengelolaan Imprest Account dan Statement of Expenditures (SOE); b. Penilaian atas kecukupan bukti yang mendukung pelaksanaan prosedur Imprest Account; c. Penilaian atas kepatuhan pelaksanaan proyek dengan perjanjian pinjaman dan ketentuan yang ditetapkan oleh IBRD. BPK. LHP LK Coremap-CTI Project IBRD Loan No. 8336 - ID Tahun 2021 4 4. Entitas yang Diperiksa Pemeriksaan dilakukan pada seluruh entitas/organisasi pelaksana program Coremap- CTI pada Deputi Bidang IPK BA 079 LIPI di BRIN yang meliputi: a. BA 079 LIPI di BRIN selaku Executing Agency (EA); b. Deputi Bidang IPK BA 079 LIPI di BRIN selaku Project Management Office (PMO); c. Pusat Penelitian Oseanografi (P2O) BA 079 LIPI di BRIN, Pusbindiklatren Bappenas dan ICCTF Bappenas selaku Project Implementation Unit (PIU). Pada tahun 2021 LIPI melebur ke BRIN sebagaimana diatur dalam Peraturan Presiden (Perpres) Nomor 78 Tahun 2021 yang diterbitkan pada tanggal 24 Agustus 2021 dimana pada Pasal 70 antara lain dinyatakan bahwa dalam jangka waktu paling lama 1 (satu) tahun sejak berlakunya Perpres ini, kelembagaan, tugas, fungsi, dan kewenangan pada LIPI dialihkan menjadi tugas, fungsi, dan kewenangan BRIN. Selain itu pada Pasal 71 dinyatakan bahwa pendanaan, pegawai, perlengkapan, aset, dan dokumen serta pengalihan objek lain yang dimiliki oleh LIPI dialihkan ke BRIN dalam jangka waktu paling lama 1 (satu) tahun. Sampai dengan tanggal 25 Februari 2022 BRIN telah menerbitkan peraturan terkait Struktur Organisasi dengan rincian sebagai berikut: a. Peraturan BRIN Nomor 1 Tahun 2021 tanggal 25 Agustus 2021 tentang Organisasi dan Tata Kerja BRIN; b. Peraturan BRIN Nomor 4 Tahun 2021 tanggal 22 September 2021 tentang Organisasi Riset; c. Peraturan BRIN Nomor 5 Tahun 2021 tanggal 22 September 2021 tentang Tugas, Fungsi dan Struktur Organisasi Riset Penerbangan dan Antariksa; d. Peraturan BRIN Nomor 8 Tahun 2021 tanggal 22 September 2021 tentang Tugas, Fungsi dan Struktur Organisasi Riset Ilmu Pengetahuan Hayati; e. Peraturan BRIN Nomor 6 Tahun 2022 tanggal 25 Februari 2022 tentang Tugas, Fungsi dan Struktur Organisasi Riset Tenaga Nuklir; f. Peraturan BRIN Nomor 9 Tahun 2022 tanggal 25 Februari 2022 tentang Tugas, Fungsi dan Struktur Organisasi Riset Hayati dan Lingkungan; g. Peraturan BRIN Nomor 13 Tahun 2022 tanggal 25 Februari 2022 tentang Tugas, Fungsi dan Struktur Organisasi Riset Kesehatan. Berdasarkan Peraturan BRIN Nomor 1 Tahun 2021 tanggal 25 Agustus 2021 tentang Organisasi dan Tata Kerja BRIN, Organisasi Pelaksana BRIN terdiri dari Kepala, Wakil Kepala, Sekretaris Utama, tujuh Deputi, Inspektorat Utama dan Organisasi Riset. Tugas pokok dan fungsi LIPI dilaksanakan di beberapa Deputi dan Organisasi Riset. Peleburan LIPI ke BRIN mengakibatkan penyesuaian nama struktur organisasi yang ada di LIPI. Sebagai contoh Deputi Bidang Ilmu Pengetahuan Kebumian (IPK) dan Pusat Penelitian Oseanografi (P2O) LIPI setelah melebur ke BRIN berubah menjadi Organisasi Riset Kebumian dan Maritim dan Pusat Riset Oseanografi. BPK. LHP LK Coremap-CTI Project IBRD Loan No. 8336 - ID Tahun 2021 5 Terkait Struktur Organisasi di BRIN tidak menutup kemungkinan masih mengalami perubahan dimasa mendatang mengingat BRIN merupakan lembaga baru dari penggabungan LIPI (BA 079), BPPT (BA 081), BATAN (BA 080), Kemenristek/ BRIN (BA 042), dan LAPAN (BA 081). Proses penyesuaian nama, tugas dan fungsi masing-masing satuan kerja sangat memungkinkan terjadi mengikuti perkembangan kondisi. 5. Lingkup Pemeriksaan Pemeriksaan dilakukan atas Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021 yang terdiri dari Cumulative Project Expenditure and Financing, Actual Project Expenditure and Financing, Project Sources and Uses of Funds, Project Uses of Funds by Category, Summary Sheet of Payment of Contract Subject to Prior Review, Summary Statement of Expenditures, Designated/Special Account Activity Statement tanggal 31 Desember 2021 dan Catatan atas Laporan Keuangan (CaLK). 6. Sasaran Pemeriksaan Sasaran pemeriksaan ini adalah Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021, termasuk Sistem Pengendalian Intern dan kegiatan- kegiatan yang berkaitan dengan pelaksanaan program Coremap-CTI pada: a. Pelaksanaan kegiatan komponen 1 yaitu penguatan kelembagaan pemantauan ekonomi pesisir; b. Pelaksanaan kegiatan komponen 2 yaitu dukungan untuk riset ekosistem pesisir berbasis kebutuhan stakeholders. Komponen penelitian berbasis permintaan (demand driven research) terdiri dari dua sub-komponen, yaitu: 1) Penguatan prosedur kelembagaan untuk penelitian ekosistem pesisir; dan 2) Pengembangan kapasitas teknis; c. Pelaksanaan kegiatan komponen 3 yaitu penguatan kelembagaan institusi pelaksana riset dan pemantauan ekosistem pesisir; d. Pelaksanaan kegiatan komponen 4 yaitu manajemen proyek. 7. Metodologi Pemeriksaan Pemeriksaan atas Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021 dilakukan dengan pendekatan sebagai berikut: a. Pendekatan Risiko Metodologi yang diterapkan dalam melakukan pemeriksaan terhadap Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021 menggunakan pendekatan risiko, yang didasarkan pada pemahaman dan pengujian atas efektivitas SPI penyusunan laporan keuangan. Hasil pemahaman BPK. LHP LK Coremap-CTI Project IBRD Loan No. 8336 - ID Tahun 2021 6 dan pengujian tersebut akan menentukan tingkat keandalan asersi manajemen dan kepatuhan terhadap ketentuan yang berlaku. Penetapan risiko pemeriksaan (audit risk) simultan dengan tingkat risiko pengendalian (control risk) serta risiko bawaan (inherent risk) entitas yang diperiksa. Hal ini digunakan sebagai acuan dalam menentukan risiko deteksi (detection risk) yang diharapkan serta menentukan fokus pemeriksaan dan jumlah pengujian yang dilakukan. b. Materialitas Penetapan tingkat materialitas awal (Planning Materiality/PM) yang merupakan tingkat materialitas pada keseluruhan laporan keuangan yaitu sebesar 2,38% dari realisasi belanja. Untuk pemeriksaan laporan keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021 penetapan PM sebesar Rp2.435.461.841 dari realisasi belanja TA 2020 audited sebesar Rp102.330.329.461. Standar materialitas di atas tidak berlaku atas penyimpangan yang mengandung unsur kolusi, korupsi, dan nepotisme (KKN) dan pelanggaran hukum. c. Uji petik pemeriksaan (audit sampling) Pemeriksaan ini dilakukan dengan cara melakukan pengujian secara uji-petik atas transaksi dalam populasi yang akan diuji. Kesimpulan pemeriksaan akan diperoleh berdasarkan hasil uji-petik yang dijadikan dasar untuk menggambarkan kondisi dari populasinya. Dalam pemeriksaan ini, Pemeriksa menentukan luas sampel berdasarkan hasil penilaian risiko yang telah dilakukan dengan memperhatikan kecukupan jumlah sampel yang dipilih baik dari segi nilai rupiah atau jenis transaksinya. d. Pelaporan Pemeriksa menyusun Konsep Temuan Pemeriksaan atas Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021, apabila menemukan permasalahan yang perlu dikomunikasikan kepada entitas. Permasalahan tersebut meliputi (1) Ketidakefektifan sistem pengendalian intern; (2) Penyimpangan dari ketentuan peraturan perundang-undangan; (3) Ketidakpatutan terhadap peraturan perundang-undangan yang signifikan, dan (4) ikhtisar koreksi. Konsep Temuan Pemeriksaan tersebut disampaikan Ketua Tim Pemeriksa kepada pejabat entitas yang berwenang untuk mendapatkan tanggapan tertulis dan resmi dari entitas. Setelah Konsep Temuan Pemeriksaan disampaikan Ketua Tim Pemeriksa kepada entitas, Tim Pemeriksa membahas temuan tersebut dengan pejabat entitas yang berwenang. Penolakan atas ikhtisar koreksi, temuan SPI, dan ketidakpatuhan dapat dipertimbangkan berpengaruh terhadap opini. Tanggapan resmi dan tertulis atas Konsep Temuan Pemeriksaan diperoleh dari pejabat entitas yang berwenang. Tanggapan tersebut diungkapkan dalam Temuan Pemeriksaan atas Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021. Temuan Pemeriksaan diserahkan oleh Penanggung Jawab kepada pejabat entitas yang berwenang. Penyampaian Temuan Pemeriksaan atas Laporan Keuangan Coremap-CTI Project IBRD Loan No. 8336-ID Tahun 2021 tersebut merupakan akhir dari pekerjaan lapangan pemeriksaan ini. BPK. LHP LK Coremap-CTI Project IBRD Loan No. 8336 - ID Tahun 2021 7 8. Jangka Waktu Pemeriksaan Pemeriksaan dilaksanakan selama 20 hari berdasarkan Surat Tugas Badan Pemeriksa Keuangan Nomor 8/ST/V-XVI.3/01/2022 tanggal 3 Januari 2022. 9. Batasan Pemeriksaan Semua informasi yang disajikan dalam laporan keuangan merupakan tanggung jawab manajemen. Oleh karena itu, BPK tidak bertanggung jawab terhadap salah interpretasi dan kemungkinan pengaruh atas informasi yang tidak diberikan baik yang sengaja maupun tidak disengaja oleh manajemen. Pemeriksaan BPK meliputi prosedur-prosedur yang dirancang untuk memberikan keyakinan yang memadai dalam mendeteksi adanya kesalahan dan salah saji yang berpengaruh material terhadap laporan keuangan. Pemeriksaan BPK tidak ditujukan untuk menemukan kesalahan atau penyimpangan. Walaupun demikian, jika dari hasil pemeriksaan ditemukan penyimpangan, akan diungkapkan. Dalam melaksanakan pemeriksaan, BPK juga menyadari kemungkinan adanya perbuatan-perbuatan melanggar hukum yang timbul. Namun pemeriksaan BPK tidak memberikan jaminan bahwa semua tindakan melanggar hukum akan terdeteksi dan hanya memberikan jaminan yang wajar bahwa tindakan melanggar hukum yang berpengaruh secara langsung dan material terhadap angka-angka dalam laporan keuangan akan terdeteksi. BPK akan menginformasikan bila ada perbuatan- perbuatan melanggar hukum atau kesalahan/penyimpangan material yang ditemukan selama pemeriksaan. Dalam melaksanakan pengujian kepatuhan, BPK hanya menguji kepatuhan instansi atas ketentuan peraturan perundang-undangan yang terkait langsung dengan penyusunan laporan keuangan. Hal ini tidak menutup kemungkinan bahwa masih terdapat ketidakpatuhan pada peraturan yang tidak teridentifikasi. Pada tanggal 11 Maret 2020, World Health Organization (WHO) menetapkan Corona Virus Disease 2019 (COVID-19) sebagai pandemik global. Dengan memperhatikan kondisi penyebaran COVID-19 di Indonesia dan kebijakan Pemerintah atas upaya pencegahan COVID-19, serta Pemberlakuan Pembatasan Kegiatan Masyarakat (PPKM) di beberapa daerah di Indonesia, Pemeriksaan laporan keuangan LIPI BA 079 di BRIN dilaksanakan secara Work From Office (WFO) maupun Work From Home (WFH). Untuk itu, Pemeriksa memodifikasi pelaksanaan prosedur dengan memanfaatkan teknologi komunikasi dalam perolehan data dan analisis data, khususnya terhadap pelaksanaan prosedur pemeriksaan yang pada kondisi normal dilakukan melalui perolehan dokumen hardcopy, wawancara tatap muka dengan pihak terkait, dan cek fisik atau observasi langsung di lapangan BADAN PEMERIKSA KEUANGAN REPUBLIK INDONESIA BPK. LHP LK Coremap-CTI Project IBRD Loan No. 8336 - ID Tahun 2021 8 2021 LAPORAN KEUANGAN COREMAP-CTI DEPUTI BIDANG ILMU PENGETAHUAN KEBUMIAN LEMBAGA ILMU PENGETAHUAN INDONESIA LAPORAN KEUANGAN CORAL REEF REHABILITATION AND MANAGEMENT PROGRAM CORAL TRIANGLE INITIATIVE PROJECT (COREMAP-CTI) (AUDITED) DEPUTI BIDANG ILMU PENGETAHUAN KEBUMIAN LEMBAGA ILMU PENGETAHUAN INDONESIA TAHUN ANGGARAN 2021 INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT (IBRD) LOAN NO 8336 - ID SURAT PERNYATAAN TENTANG TANGGUNG JAWAB ATAS LAPORAN KEUANGAN TAHUNAN CORAL REEF REHABILITATION AND MANAGEMENT PROGRAM – CORAL TRIANGLE INITIATIVE PROJECT (COREMAP-CTI) IBRD LOAN NO. 8336-ID PERIODE 01 JANUARI SD 31 DESEMBER 2021 Kami yang bertanda tangan dibawah ini: Nama : Prof. Dr. Ocky Karna Radjasa, M.Sc. Alamat Kantor : Lembaga Ilmu Pengetahuan Indonesia (LIPI) / Badan Riset Inovasi Nasional (BRIN) Sasana W idya Sarwono Jl. Gatot Subroto No. 10, Jakarta. Jabatan : Direktur Project Management Office (PMO) COREMAP- CTI/Kepala Organisasi Riset Kebumian dan Maritim Menyatakan bahwa: 1. Adalah pihak yang bertanggung jawab atas penyajian dan penyusunan Laporan Keuangan Tahunan COREMAP-CTI LIPI, IBRD Loan No. 8336-ID untuk Tahun Anggaran 2021; 2. Adalah pihak yang bertanggung jawab atas realisasi pengeluaran dalam proyek COREMAP-CTI LIPI, IBRD Loan No. 8336-ID untuk Tahun Anggaran 2021; 3. Adalah pihak yang bertanggung jawab atas pengendalian intern dalam proyek COREMAP-CTI LIPI, IBRD Loan No. 8336-ID untuk Tahun Anggaran 2021; 4. Laporan Keuangan Tahunan Proyek COREMAP-CTI LIPI, IBRD Loan No. 8336-ID Tahun Anggaran 2021 yang disampaikan adalah Interim Financial Report (IFRs) sesuai dengan World Bank Disbursement Guidelines for Projects yang berisi realisasi pengeluaran proyek selama tahun anggaran yang bersangkutan; 5. Masa pembukuan Laporan Keuangan Proyek COREMAP-CTI LIPI, IBRD Loan No. 8336-ID Tahun Anggaran 2021 dilaksanakan sesuai dengan Tahun Anggaran Pemerintah RI, yaitu dari tanggal 1 Januari sampai dengan 31 Desember. Kebijakan untuk transaksi yang terjadi di akhir tahun dan pembebanan dilakukan di tahun berikutnya, maka dicatatkan sesuai Tahun Anggaran; 6. Laporan Keuangan Tahunan Proyek COREMAP-CTI LIPI, IBRD Loan No. 8336-ID Tahun Anggaran 2021 mengungkapkan dan mempergunakan pencatatan atas dasar cash basis, berbeda dengan Laporan Keuangan Kementerian/Lembaga yang menggunakan pencatatan atas dasar accrual basis; 7. Semua informasi dalam Laporan Keuangan Tahunan Proyek COREMAP-CTI LIPI, IBRD Loan NO. 8336-ID termasuk catatan atas laporan keuangan telah dimuat secara lengkap dan benar; 8. Laporan Keuangan Tahunan Proyek COREMAP-CTI LIPI, IBRD Loan No. 8336-ID Tahun Anggaran 2021 tidak mengandung informasi atau fakta material yang tidak benar, dan tidak menghilangkan informasi atau fakta material; Demikian pernyataan ini dibuat dengan sebenarnya. Direktur Project Management Office (PMO) COREMAP- CTI, Prof. Dr. Ocky Karna Radjasa, M.Sc. i KATA PENGANTAR Laporan Keuangan Tahun 2021 diharapkan dapat memberikan informasi yang berguna kepada pemakai laporan, khususnya sebagai sarana untuk meningkatkan akuntabilitas/pertanggungjawaban dan transparansi pengelolaan keuangan negara pada Program COREMAP-CTI IBRD Loan No. 8336-ID. Laporan ini merupakan tanggung jawab kami dan disusun dengan acuan dari Disbursement Letter yang diterbitkan oleh World Bank. Direktur Project Management Office (PMO) COREMAP- CTI, Prof. Dr. Ocky Karna Radjasa, M.Sc. i DAFTAR ISI SURAT PERNYATAAN ............................................................................................................... i KATA PENGANTAR ................................................................................................................... i DAFTAR ISI ................................................................................................................................ ii 1. LAPORAN KEUANGAN TAHUNAN ................................................................................... 1 1.1 KUMULATIF PENGELUARAN DAN PEMBIAYAAN PROYEK ....................................... 1 1.2 AKTUAL REALISASI PENGELUARAN DAN PEMBIAYAAN PROYEK .......................... 2 1.3 SUMBER DAN PENGGUNAAN DANA PROYEK ........................................................... 3 1.4 REALISASI PENGGUNAAN DANA PROYEK PER KATEGORI/KOMPONEN ............... 4 1.5 REALISASI PENINJAUAN ATAS PEMBIAYAAN KONTRAK ......................................... 6 1.6 RINGKASAN TERHADAP PENGELUARAN PROYEK .................................................. 7 1.7 RINGKASAN ATAS LAPORAN REKENING KHUSUS IBRD LOAN 8336 ID ................. 8 2. CATATAN ATAS LAPORAN KEUANGAN .......................................................................... 10 2.1. DESKRIPSI PROYEK ................................................................................................. 10 2.2. PEMBIAYAAN COREMAP CTI ................................................................................... 11 2.3. KEBIJAKAN AKUNTANSI ........................................................................................... 13 2.4. MEKANISME (SISTEM DAN PROSEDUR) PENYUSUNAN LAPORAN ..................... 15 2.5. RINCIAN PENJELASAN ATAS LAPORAN KEUANGAN TAHUNAN ........................... 16 3. INFORMASI TAMBAHAN .................................................................................................... 21 4. DAFTAR TABEL Tabel 1. Rekapitulasi pengembalian dana (Refund) kegiatan COREMAP CTI IBRD Loan 8336 ID Periode Januari s/d Desember 2021 Tabel 2. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2017 Tabel 3. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2018 Tabel 4. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2019 Tabel 5. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2020 Tabel 6. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2021 5. LAMPIRAN-LAMPIRAN Lampiran I. Statement of Expenditures for those NOT Subject to Prior Review Lampiran II. Statement of Expenditures BY COMPONENT for those NOT Subject to Prior Review Lampiran III. Statement of Expenditures BY COMPONENT 1 Lampiran IV. Statement of Expenditures BY COMPONENT 2 Lampiran V. Statement of Expenditures BY COMPONENT 4 ii 1. LAPORAN KEUANGAN TAHUNAN 1.1 KUMULATIF PENGELUARAN DAN PEMBIAYAAN PROYEK 1 1.2 AKTUAL REALISASI PENGELUARAN DAN PEMBIAYAAN PROYEK 2 1.3 SUMBER DAN PENGGUNAAN DANA PROYEK 3 1.4 REALISASI PENGGUNAAN DANA PROYEK PER KATEGORI/KOMPONEN 4 5 1.5 REALISASI PENINJAUAN ATAS PEMBIAYAAN KONTRAK 6 1.6 RINGKASAN TERHADAP PENGELUARAN PROYEK 7 1.7 RINGKASAN ATAS LAPORAN REKENING KHUSUS IBRD LOAN 8336 ID 8 9 2. CATATAN ATAS LAPORAN KEUANGAN 2.1. DESKRIPSI PROYEK Coral Reef Rehabilitation and Management Program - Coral Triangle Initiative (COREMAP-CTI) atau Program Rehabilitasi dan Pengelolaan Terumbu Karang —Inisiatif Segitiga Terumbu Karang merupakan fase ketiga dan terakhir dari program jangka panjang untuk melestarikan terumbu karang di Indonesia dengan melindungi terumbu karang dari praktik penangkapan ikan yang merusak, polusi lokal, dan perubahan iklim. Tujuan proyek COREMAP-CTI secara umum adalah untuk melembagakan pendekatan COREMAP sebagai suatu kerangka kerja yang berkelanjutan, terdesentralisasi dan terpadu untuk pengelolaan sumber daya terumbu karang, sistem ekologi, dan keanekaragaman hayati terkait untuk kesejahteraan masyarakat di kabupaten terpilih di masing-masing provinsi di Indonesia. Sejak ditandantanganinya Amandemen Loan (Amended and Restated Loan) No. 8336-ID oleh Bank Dunia (World Bank) pada tanggal 19 Juni 2017 dan Counter Signed dari Kementerian Keuangan pada tanggal 14 Agustus 2017, Lembaga Ilmu Pengetahuan Indonesia (LIPI) sebagai Executing Agency (EA) untuk Proyek COREMAP-CTI, setelah peralihan dari Kementerian Kelautan dan Perikanan (KKP). Kemudian berdasarkan hasil restrukturisasi Proyek COREMAP-CTI kedua, telah ditandatangani Amandemen Loan 8336-ID yang kedua pada tanggal 19 Juni 2019 dengan menambah kegiatan COREMAP CTI dari Grant GEF dengan Instansi Pelaksananya ICCTF Bappenas. Dengan demikian sejak saat itu terdapat 3 (tiga) Project Implementation Unit (PIU) kegiatan COREMAP CTI yaitu Pusat Penelitian Oseanografi (P2O) LIPI, Pusbindiklatren Bappenas dan ICCTF Bappenas. Kemudian sejak tahun anggaran 2020, pengelola keuangan kegiatan COREMAP CTI ditangani langsung oleh Deputi Bidang Ilmu Pengetahuan Kebumian LIPI sebagai Kuasa Pengguna Anggaran (KPA) dan sekaligus sebagai Direktur Project Management Office (PMO) COREMAP-CTI. Kegiatan proyek COREMAP-CTI tahun anggaran 2020 sebagian besar sudah berjalan sesuai rencana. Tujuan Proyek COREMAP-CTI setelah adanya amandemen loan tersebut adalah untuk memperkuat kapasitas kelembagaan dalam pemantauan dan penelitian ekosistem pesisir untuk menghasilkan bukti berbasis informasi manajemen sumber daya, dan untuk meningkatkan efektivitas pengelolaan ekosistem pesisir prioritas. Untuk mencapai tujuan ini, ruang lingkup proyek COREMAP-CTI dimodifikasi namun masih terdiri dari empat komponen utama, yaitu: 1. Penguatan Kelembagaan Pemantauan Ekosistem Pesisir. 10 2. Dukungan untuk penelitian ekosistem berbasis permintaan. 3. Pengelolaan prioritas ekosistem pesisir. 4. Manajemen Proyek. 2.2. PEMBIAYAAN COREMAP CTI COREMAP-CTI dilaksanakan melalui dana Pinjaman World Bank atau Bank Dunia (Loan/Credit No. IBRD-83360 dan Hibah Fasilitas Lingkungan Global (GEF Grant No. TF-15470. Pembiayaan ini melalui pinjaman Bank Dunia (IBRD Loan) sebesar US $ 47,38 juta (75,07 %), bantuan Hibah US $ 10,0 juta (15,84 %) dan kontribusi Pemerintah RI sebesar US $ 5,74 juta (9,09 %). Persetujuan pinjaman loan untuk proyek COREMAP-CTI ditandatangani oleh Bank Dunia dan Pemerintah RI pada tanggal 17 Maret 2014. Pinjaman loan mulai efektif pada tanggal 5 Juni 2014. Program akan dilaksanakan selama 5 (lima) tahun mulai dari 5 Juni 2014 sampai 30 Juni 2019. COREMAP-CTI yang dibiayai dari IBRD Loan 8336-ID dengan alokasi sebesar USD. 47.380.000 dengan spesifikasi sebagai berikut: A. Nomor Loan : 8336-ID B. Tanggal Penandatanganan : 17 Maret 2014 C. Legal Opinion : 15 April 2014 D. Effective Date : 05 Juni 2014 E. Jangka Waktu : 2014-2019 F. Closing Date : 30 Juni 2019 G. Total Loan : USD.47.380.000,00 H. Executing Agency : Kementerian Kelautan dan Perikanan I. Nomor Register : 1088901 J. Rekening Khusus : 601322411980 K. Perdirjen Perbendaharaan : PER-24/PB/2014 Tanggal 08 September 2014 Berdasarkan IBRD Loan 8336-ID Program COREMAP-CTI, Alokasi Dana kegiatan Coremap-CTI dibagi atas tiga kategori sebagai berikut: 11 Allocation of the Loan Proceeds by Category Base on Original Loan Agreement Percentage of Amount of the Loan Expenditures to Category Allocated be Financed (expressed in USD) (inclusive of Taxes) (1) Works, Training and Workshops, Consultant 34.043.000,00 100% Services, Goods, Incremental Operating Costs 100% of Grant (2) Grants 11.045.000,00 amount disbursed (3) Scholarships 2.292.000,00 100% TOTAL AMOUNT 47,380,000,00 Sejak tahun 2017, Loan Agreement COREMAP-CTI tersebut telah dilakukan amandemen melalui dokumen Amended and Restated Loan Agreement 8336-ID pada tanggal 19 Juni 2017 dimana seluruh pengeluaran dibebankan pada Category 4, dengan alokasi biaya sebesar USD.34.363.703,00 yang telah ditandatangani oleh Kementerian Keuangan tanggal 14 Agustus 2017, dengan spesifikasi sebagai berikut: A. Nomor Loan : 8336-ID B. Tanggal Penandatanganan : 19 Juni 2017 (Amended and Restated LA) C. Jangka Waktu : 2017-2020 D. Closing Date : 31 Desember 2020 E. Executing Agency : Lembaga Ilmu Pengetahuan Indonesia (LIPI) F. Nomor Register : 1088901 G. Rekening Khusus : 601322411980 Besarnya alokasi pembiayaan per kategori proyek ditunjukkan dalam tabel berikut: Allocation of the Loan Proceeds by Category Base on Amended and Restated Loan Agreement Percentage of Amount of the Loan Expenditures to be Category Allocated Financed (expressed in USD) (inclusive of Taxes) (1) Works, Training and Workshops, Consultant Services, Goods, Incremental Operating Costs (pro‐ 12,571,620 100% memoria) (2) Grants (pro‐memoria) - 0% (3) Scholarships (pro‐memoria) 444,677 100% (4) Works, Training and Workshops, Consultant Services, Non‐consulting Services, Goods, 34,363,703 100% Scholarships and Incremental Operating Costs TOTAL AMOUNT 47,380,000 12 Pada tanggal 19 Juni 2019, telah dilakukan amandemen melalui dokumen Amendment to the Amended and Restated Loan Agreement 8336-ID, dimana seluruh kegiatan pada Component 1.1, 1.3, 2 dan 4 akan dilaksanakan oleh RCO LIPI- PIU, sedangkan untuk Component 1.2 akan dilaksanakan oleh CPDET-BAPPENAS-PIU dan Component 3 dilaksanakan oleh ICCTF-BAPPENAS-PIU, sebagai berikut: A. Nomor Loan : 8336-ID B. Tanggal Penandatanganan : 19 Juni 2019 (Amended and Restated LA) C. Jangka Waktu : 2019-2022 D. Closing Date : 30 Juni 2022 E. Executing Agency : Lembaga Ilmu Pengetahuan Indonesia (LIPI) F. Nomor Register : 1088901 G. Rekening Khusus : 601322411980 Besarnya alokasi pembiayaan per kategori proyek ditunjukkan dalam tabel berikut: Allocation of the Loan Proceeds by Category Base on Amendment to the Amended and Restated Loan Agreement Percentage of Amount of the Loan Expenditures to be Category Allocated Financed (expressed in USD) (inclusive of Taxes) (1) Works, Training and Workshops, Consultant Services, 12.502.542 100% Goods, Incremental Operating Costs (pro‐ memoria) (2) Grants (pro‐memoria) - 0% (3) Scholarships (pro‐memoria) 444,677 100% (4) Works, Training and Workshops, Consultant Services, Non‐consulting Services, Goods, Scholarships and 34.432.781 100% Incremental Operating Costs Under Parts 1,2 and 4 of the project TOTAL AMOUNT 47,380,000 2.3. KEBIJAKAN AKUNTANSI Kebijakan akuntansi proyek COREMAP-CTI IBRD Loan 8336-ID berpedoman pada Standar Akuntansi Indonesia serta prinsip-prinsip akuntansi yang berlaku khusus pada proyek, yaitu sebagai berikut; 1. Tata laksana administrasi keuangan proyek yang telah dilaksanakan sesuai dengan penjelasan yang telah ditetapkan dan ketentuan-ketentuan lain dibidang keuangan yang masih berlaku. 2. Perlakuan pembukuan penerimaan dan pengeluaran dilakukan atas dasar kas (cash basis) pada saat kejadiannya. 13 3. Masa pembukuan dilaksanakan sesuai dengan Tahun Anggaran Pemerintah RI, yaitu dari tanggal 1 Januari sampai dengan 31 Desember. Kebijakan untuk transaksi yang terjadi di akhir tahun dan pembebanan dilakukan di tahun berikutnya, maka dicatatkan sesuai Tahun Anggaran, bukan pembebanan di Reksus. 4. Mata uang yang digunakan adalah mata uang rupiah (Rp) dan valuta asing yang di ekuivalenkan ke dalam rupiah, sesuai kurs saat transaksi penarikan dana dari Designated Account. 5. Laporan Keuangan ini merupakan Laporan Pertanggungjawaban Proyek COREMAP-CTI IBRD Loan No 8336-ID, atas dana yang dikelola yang berasal dari pinjaman luar negeri melalui Rekening Khusus. 6. Penerimaan pembiayaan dari Pemerintah RI/APBN dicatat berdasarkan SP2D/LS dan GU yang dicairkan melalui Kantor Pelayanan Perbendaharaan Negara (KPPN), sedangkan pengeluarannya dicatat sesuai dengan bukti-bukti pembayaran yang dikelompokkan menurut kategori/komponen. 7. Penerimaan pembiayaan dari pinjaman luar negeri direalisasikan melalui prosedur pembiayaan Rekening Khusus dan dicatat dengan cara: a. Penerimaan pembiayaan dari Rekening Khusus dicatat berdasarkan SP2D yang dicairkan melalui Rekening Khusus pada Bank Indonesia. b. Pengeluaran dicatat sesuai dengan bukti-bukti pembayaran yang dikelompokkan menurut kategori/komponennya. c. Penerimaan pembayaran dengan cara pembayaran langsung (direct payment) dicatat berdasarkan Withdrawal Authorization (WA) dari World Bank. Konversi dari mata uang asing kedalam mata uang rupiah berdasarkan kurs tengah Bank Indonesia per tanggal penerbitan Aplikasi WA. 8. Laporan Keuangan tidak disusun atas dasar kesinambungan entitas 9. Kerangka pelaporan disusun berdasarkan Schedule 2 Section II.B.3 dari Amended and Restated Loan Agreement serta ketentuan teknis terkait antara lain yang dijelaskan pada Letter No.CD-049/COREMAP CTI/III/2014 tanggal 17 Maret 2014 terkait Additional Instructions : Disbursement. 10. Kerangka pelaporan merupakan kerangka bertujuan khusus untuk memenuhi kebutuhan International Bank for Reconstruction and Development (IBRD) yang mungkin tidak cocok untuk tujuan lain. 14 2.4. MEKANISME (SISTEM DAN PROSEDUR) PENYUSUNAN LAPORAN Mekanisme (system dan prosedur) penyusunan laporan keuangan atas Loan World Bank IBRD Nomor 8336-ID Tahun 2021 pada Coral Reef Rehabilitation and Management Program-Coral Triangle Initiative (COREMAP-CTI) Project di Lembaga Ilmu Pengetahuan Indonesia adalah: 1. Laporan Keuangan Project Coremap-CTI FY 2021 mengungkapkan dan mempergunakan pencatatan atas dasar cash basis. 2. Laporan Keuangan Proyek yang disampaikan adalah IFR yang sudah berisi realisasi tahun bersangkutan (FY 2021). Apabila ada realisasi tahun 2021 yang SP2D-nya terbit tahun 2022, maka harus disampaikan di Laporan Keuangan (IFR dibuat sebagai Annual IFR) FY 2021. Hal ini mungkin bisa berbeda dengan IFR yang disampaikan ke Bank, karena dalam hal ini IFR disampaikan untuk pertanggungjawaban penggunaan dana; 3. Interim Financial Report (IFR) dibuat dengan mengacu kepada Rekening Khusus, Client Connection World Bank, DIPA tahun berjalan, SP2D yang terbit dan tercantum di Rekening Khusus, serta Progres Implementation Project; 4. Interim Financial Report (IFR) disampaikan ke World Bank (Lender) setiap tiga bulan, maksimal 45 hari setelah periode pelaporan; 5. Interim Financial Report (IFR) digunakan sebagai dasar pengajuan advance (withdrawal application); 6. Pihak proyek (Executing Agency) berkoordinasi dengan pihak MoF (Ministry of Finance) dalam hal ini di Ditjen Perbendaharaan Pengelolaan Kas Negara dalam perolehan data termasuk melakukan Rapat Koordinasi Rekonsiliasi Penggunaan Dana Pinjaman dan Hibah. 15 2.5. RINCIAN PENJELASAN ATAS LAPORAN KEUANGAN TAHUNAN 1. Kumulatif Pembiayaan dan Pengeluaran Dana (Rp585.410.583.454) Jumlah tersebut merupakan akumulasi pencairan dana untuk kegiatan Proyek COREMAP-CTI IBRD Loan 8336 ID yang berakhir sampai dengan 31 Desember 2021, antara lain sebagai berikut. GOI IBRD TOTAL Keterangan ( Rp ) ( Rp ) ( Rp ) Jumlah per 31 Desember 2020 24.194.121.012 458.886.132.981 483.080.253.993 Mutasi : 1 Januari s/d 31 Desember 2021 0 102.330.329.461 102.330.329.461 Jumlah per 31 Desember 2020 24.194.121.012 561.216.462.442 585.410.583.454 2. Kumulatif Pengeluaran Dana Rupiah Murni (Rp24.194.121.012) Jumlah tersebut merupakan kumulatif pembiayaan dan pengeluaran dana Rupiah Murni (RM) kegiatan Project COREMAP-CTI IBRD Loan 8336 ID, untuk periode tahun 2014 sampai dengan 31 Desember 2021, dapat dijelaskan sebagai berikut. Keterangan Total RM (Rp) Jumlah per 31 Desember 2020 24.194.121.012 Mutasi : 1 Januari s/d 31 Desember 2021 0 Jumlah per 31 Desember 2021 24.194.121.012 3. Kumulatif Pengeluaran Dana per Kategori a. Kategori 1 (Rp191.635.636.642) Jumlah tersebut merupakan akumulasi pengeluaran untuk membiayai pekerjaan Training, Workshop, Consulting Services, Civil Works, Goods dan IOC sampai dengan 31 Desember 2021, sedangkan untuk Tahun Anggaran 2021, tidak ada mutasi untuk Kategori 1 dengan rincian sebagai berikut. GOI IBRD TOTAL Keterangan ( Rp ) ( Rp ) ( Rp ) Jumlah per 31 Desember 2020 18.813.477.566 172.822.159.076 191.635.636.642 Mutasi : 1 Januari s/d 31 Desember 2021 - - - Jumlah per 31 Desember 2021 18.813.477.566 172.822.159.076 191.635.636.642 16 b. Kategori 2 (Rp0) Sampai dengan 31 Desember 2021, Tidak ada akumulasi pengeluaran yang dibiayai untuk kegiatan pada Kategori 2 Block Grant. c. Kategori 3 (Rp6.371.362.754) Jumlah tersebut merupakan akumulasi pengeluaran untuk membiayai kegiatan Scholarship, sampai dengan 31 Desember 2020, sedangkan Tahun Anggaran 2021, tidak ada mutasi untuk Kategori 3 dengan rincian sebagai berikut. GOI IBRD TOTAL Keterangan ( Rp ) ( Rp ) ( Rp ) Jumlah per 31 Desember 2020 - 6.371.362.754 6.371.362.754 Mutasi : 1 Januari s/d 31 Desember 2021 - - - Jumlah per 31 Desember 2021 - 6.371.362.754 6.371.362.754 d. Kategori 4 (Rp381.637.852.677) Jumlah tersebut merupakan akumulasi pengeluaran untuk membiayai pekerjaan Works, Training and Workshops, Consulting Services, Non-Consulting Services, Goods, Scholarship and Incremental Operating Cost sampai dengan 31 Desember 2021, dengan rincian sebagai berikut. GOI IBRD TOTAL Keterangan ( Rp ) ( Rp ) ( Rp ) Jumlah per 31 Desember 2020 5.380.643.446 279.692.611.151 285.073.254.597 Mutasi : 1 Januari s/d 31 Desember 2021 0 102.330.329.461 102.330.329.461 Jumlah per 31 Desember 2021 5.380.643.446 382.022.940.612 387.403.584.058 Rekapitulasi pengeluaran per kategori Proyek COREMAP-CTI, untuk mutasi periode 1 Januari sampai dengan 31 Desember 2021, sebagai berikut. GOI IBRD TOTAL No. Category ( Rp ) ( Rp ) ( Rp ) 1 Training, Workshop, Consulting Services, - - - Civil Works, Goods, IOC 2 Block Grant - - - 3 Scholarship - - - 4 Works, Training and Workshops, Consultant 0 102.330.329.461 102.330.329.461 services, Non-Consulting Services, Goods, Scholarship and Incremental Operating Cost TOTAL 0 102.330.329.461 102.330.329.461 Lebih lengkap lihat Lampiran I dan II 17 4. Pengeluaran Dana per Komponen Pengeluaran berdasarkan komponen Proyek COREMAP-CTI, untuk mutasi periode 1 Januari s/d 31 Desember 2021, sebagai berikut. No Component Total Expenditure Ket IDR Equivalent (USD) 1 Institutional Strengthening for Coastal 87.030.434.451 6.089.129,81 Lamp III Ecosystems Monitoring 2 Support for Demand-Driven Coastal 14.023.108.403 980.321,79 Lamp IV Ecosystems Research 3 Strengthening Institutional for Coastal 0 0,00 - Ecosystems Monitoring and Research 4 Project Management 1.276.786.607 89.377,00 Lamp V Total 102.330.329.461 7.158.828,60 5. Laporan Atas Rekening Khusus (Special Account) Rekening Khusus COREMAP-CTI Loan IBRD 8336-ID berada di Bank Indonesia dengan Nomor Rekening 601.322.411.980 per tanggal 31 Desember 2021, dengan uraian sebagai berikut. a. Cumulative advance to end of current reporting period Dec 31, 2021 (USD 44.258.147,00) Jumlah tersebut merupakan akumulasi advance selama masa Proyek yang ditransfer oleh IBRD ke dalam Rekening Khusus sampai dengan 31 Desember 2021. b. Cumulative expenditures to end of last reporting period Dec 31, 2021 (USD 32.996.347,41) Jumlah tersebut merupakan akumulasi pengeluaran Coremap CTI yang dibayar melalui Rekening Khusus sampai dengan 31 Desember 2021. c. Add/Substract: Cummulative adjustments ( (USD 319.512,16) Jumlah tersebut merupakan akumulasi penyelesaian atas Refund on ineligible sebelum Tahun Anggaran 2021 dengan rincian: 1) Refund on Ineligible Outstanding Balance Audit Badan Pemeriksa Keuangan Republik Indonesia (BPK RI) Tahun Anggaran (TA) 2015 dan 2016 sebesar USD 106.495,64; 2) Refund on Ineligible Expenditures atas Laporan Hasil Pemeriksaan BPK RI TA 2018 dan kelebihan pembayaran atas SP2D sebesar USD 106.077,31; 3) Refund on mischarged. Based on DA 19 March 2020 sebesar USD 28.659,61; 4) Refund on Ineligible Expenditures based on BPK Audit Report FY 2017, 2018, 2019 sebesar USD 78.279,60. 18 d. Outstanding advances to be accounted (USD 11.611.311,75) Jumlah tersebut merupakan saldo advances dalam Rekening Khusus yang harus dipertanggungjawabkan oleh Proyek Coremap-CTI selama tahun 2021. e. Opening special account balance at beginning of reporting period Jan 1, 2021 (USD 2.078.236,47) Jumlah tersebut merupakan saldo awal dalam Rekening Khusus Coremap CTI per tanggal 1 Januari 2021. f. Add/Substract: Cummulative adjustments (USD 16.924,72) Kejadian setelah tanggal laporan (subsequent event) dimana terdapat 7 (tujuh) SP2D dengan total sebesar Rp236.201.172,05 (eq. USD 16.924,72) yang merupakan pengeluaran pada bulan Desember 2020 accounted pada reksus bulan Januari 2021. g. Advances from the World Bank during reporting period (USD 9.550.000,00) Jumlah tersebut merupakan pencairan/disbursement dari IBRD ke dalam Rekening Khusus Coremap-CTI selama Tahun Anggaran 2021. h. Closing Special Account balance at end of current reporting period Dec 31, 2021 (USD 4.890.041,57) Jumlah tersebut merupakan saldo akhir dalam Rekening Khusus Coremap-CTI per tanggal 31 Desember 2021. i. Add/Substract: Cumulative Adjustments (USD 404.137,78) Selama Tahun Anggaran 2021 terdapat pengembalian dana (Refund) sebesar Rp5.765.731.380,88 equivalent USD 404.137,78, dengan uraian transaksi sebagai berikut: No Keterangan Nilai (USD) 1 Refund of Inelegible Expenditures Audit Findings FY 2017 (DA 22 (25.184,62) Jan 2021) 2 Refund of Inelegible Expenditures Audit Findings FY 2017 (DA 1 (1.437,06) Mar 2021) 3 Refund of Inelegible Expenditures Audit Findings FY 2019 (DA 1 (14.131,02) Mar 2021) 4 Refund of Inelegible Expenditures Audit Findings FY 2018 (DA 1 (196,66) Mar 2021) 5 Refund of Inelegible Expenditures Audit Findings FY 2018 (DA 30 (20.849,80) Apr 2021) 6 Refund of Inelegible Expenditures Audit Findings FY 2017 (DA 30 (59.669,86) Apr 2021) 7 Refund of Inelegible Expenditures Audit Findings FY 2020 & 2021 (142.038,50) (DA 14 Jun 2021) 8 Refund on overpayment for some activities in FY 2019. THIS IS (11.050,75) NOT BASED ON AUDITOR FINDINGS (DA 31 August 2021). 9 Refund on Ineligible Expenditures on Auditor findings for FY 2020 (1.070,43) (DA 8 Sept 2021) 19 No Keterangan Nilai (USD) 10 Correction on lack of statement of Refund on Ineligible (36,97) Expenditures on Auditor findings for FY 2020 in USD only (DA Oct 27, 2021). The refund has been stated in IFR Q3 2021 as Rp 15,409,091 or eq. USD 1,070.43. Based on Nota Dinas No. ND 553/PB.34/2021 date 28 Oct 2021 it should be charged to DA Rp 15,409,091 or eq. USD 1,107.40. The difference USD 36.97 has been corrected in DA date 27 Oct 2021. 11 Refund on default on the construction work of BBIL Mataram LIPI (125.611,34) laboratory building by PT Anugerah Bangun Kencana. This is not based on auditor findings (DA Dec 20, 2021) 12 Refund Ineligible Expenditures on Auditor findings for FY 2020 (2.860,77) (DA Dec 20, 2021). Total (404.137,78) j. Expenditures for current reporting period (USD 7.158.828,60) Jumlah tersebut merupakan pengeluaran kegiatan Coremap CTI dari Rekening Khusus selama Tahun Anggaran 2021 sejumlah USD 7.158.828,60. k. Difference (USD 33.420,64) Kejadian setelah tanggal laporan (subsequent event), dimana terdapat 3 (tiga) SP2D dengan total sebesar Rp477.179.834,00 (eq. USD33.420,64) yang merupakan pengeluaran pada bulan Desember 2021 accounted pada Reksus bulan Januari 2022. 20 3. INFORMASI TAMBAHAN 3.1. Perubahan organisasi Lembaga Ilmu Pengetahuan Indonesia (LIPI) menjadi Badan Riset dan Inovasi Nasional (BRIN) diawali dengan terbitnya Peraturan Presiden Nomor 74 Tahun 2019, kemudian diubah melalui Peraturan Presiden Nomor 95 Tahun 2019. Namun, peraturan tersebut belum dapat dilaksanakan karena pengintegrasian unit penelitian, pengembangan, pengkajian, dan penerapan, serta invensi dan inovasi yang ada di Kementerian dan Lembaga, yaitu BATAN, BPPT, LAPAN, LIPI, dan Kementerian Riset dan Teknologi memerlukan proses yang tidak mudah. Pada tahun 2021, Presiden kembali menerbitkan Peraturan Nomor 33 tahun 2021 untuk menyempurnakan peraturan sebelumnya, yaitu dengan menambahkan klausul terkait penelitian, pengembangan, pengkajian, dan penerapan, serta invensi dan inovasi yang terintegrasi di daerah, pemerintah daerah membentuk Badan Riset dan Inovasi Daerah (BRIDA). Peraturan Presiden Nomor 33 tahun 2021 ternyata masih terdapat kekurangan dalam menampung perkembangan dan kebutuhan riset dan inovasi nasional yang mendasarkan pada Haluan Ideologi Pancasila, sehingga perlu diganti dengan Peraturan Presiden Nomor 78 Tahun 2021. Untuk melaksanakan ketentuan Pasal 58 Peraturan Presiden Nomor 78 Tahun 2021 tentang BRIN, perlu menetapkan Peraturan BRIN Nomor 1 tahun 2021 tentang Organisasi dan Tata Kerja BRIN dan peraturan diberlakukan terhitung mulai tanggal 1 September 2021. BRIN mempunyai tugas membantu Presiden dalam menyelenggarakan urusan pemerintahan di bidang penelitian, pengembangan, pengkajian, dan penerapan, serta invensi dan inovasi, penyelenggaraan ketenaganukliran, dan penyelenggaraan keantariksaan secara nasional yang terintegrasi, serta melakukan pemantauan, pengendalian, dan evaluasi terhadap pelaksanaan tugas dan fungsi BRIDA sesuai dengan ketentuan peraturan perundang-undangan. Berdasarkan Peraturan Presiden RI No. 78 Tahun 2021 tanggal 24 Agustus 2021 tersebut, Lembaga Ilmu Pengetahuan Indonesia (LIPI) melebur namanya menjadi Badan Riset dan Inovasi Nasional (BRIN) terhitung mulai tanggal 1 September 2021. Demikian pula Deputi Ilmu Pengetahuan Kebumian LIPI (Deputi IPK LIPI) selaku Satuan Kerja pengelola Dana DIPA tahun 2021 berubah nomenklaturnya menjadi Organisasi Riset (OR) Ilmu Pengetahuan Kebumian BRIN. 21 Namun, dalam pelaksanaan DIPA tahun 2021 serta pembuatan laporan, OR Ilmu Pengetahuan Kebumian BRIN masih menggunakan nomenklatur Deputi IPK LIPI. Hal ini karena proses pencairan dana di Kementerian Keuangan masih menggunakan nomenklatur Deputi IPK LIPI sampai dengan berakhirnya tahun anggaran 2021. Pertimbangan atas hal tersebut karena bila akan dilakukan penggantian (revisi) nama dari LIPI menjadi BRIN akan memerlukan waktu yang cukup lama sehingga tidak efisien. Kegiatan Coral Reef Rehabilitation and Management Program-Coral Triangle Initiative (COREMAP-CTI) atau kegiatan pengelolaan terumbu karang dan ekosistem terkait yang dibiayai dari dana Loan IBRD No 8336 ID, Instansi Pelaksana (Exceuting Agency/EA) juga masih menggunakan nama Lembaga llmu Pengetahuan Indonesia (LIPI) walaupun namanya telah berubah menjadi Badan Riset dan Inovasi Nasioanl (BRIN) sejak tanggal 1 September 2021. Apabila dilakukan perubahan nama dari LIPI ke BRIN maka perlu dilakukan Amandemen Loan Agreement dimana prosesnya membutuhkan waktu yang cukup lama karena harus mendapat persetujuan dari Kantor Pusat World Bank (WB) di Washington DC, USA. Selain itu, pihak WB tidak menyetujui apabila dilakukan amandemen loan karena kegiatan COREMAP CTI telah melakukan amandemen loan sebanyak 2 kali. Selain BRIN/LIPI sebagai Executing Agency (EA) untuk kegiatan COREMAP-CTI berdasarkan Amandemen Loan 8336-ID kedua tanggal 19 Juni 2019, terdapat pula 3 (tiga) Unit Pelaksana Proyek (Project Implemetation Unit/PIU) yang berada di bawah EA yaitu Organisasi Riset Ilmu Pengetahuan Kebumian BRIN, Pusbindiklatren Bappenas dan ICCTF Bappenas. Ketiga PIU tersebut dibawah koordinasi Instansi Pelaksana (Executing Agency) yaitu BRIN/LIPI. 3.2. Realisasi Penggunaan dana PHLN kegiatan COREMAP CTI masih belum optimal, hal tersebut disebabkan antara lain: a. Pandemi Covid-19 belum berakhir dan sulit dihindari sehingga kegiatan lapangan/pertemuan tidak dapat dilakukan secara optimal; b. Beberapa paket pekerjaan pengadaan peralatan yang spesifik terkendala dengan terbatasnya calon penyedia yang berakibat terjadinya gagal lelang sehingga waktu pelaksanaan pekerjaan menjadi mundur. 3.3. Progres penyelesaian pengembalian dana (refund) kegiatan COREMAP CTI selama Tahun Anggaran 2021 adalah sebesar USD404.137,78 atau setara Rp5.765.731.380,88. Rekapitulasi pengembalian dana (refund) kegiatan 22 COREMAP-CTI IBRD Loan 8336 ID Periode Januari s/d Desember 2021 dapat dilihat pada Tabel 1. 23 Tabel 1. Rekapitulasi Pengembalian Dana (Refund) COREMAP CTI IBRD Loan 8336 ID Periode Januari s/d Desember 2021 24 3.4. Realisasi Data Aset Coremap-CTI IBRD Loan 8336 ID Berdasarkan Amended and Restated Loan Agreement 8336-ID pada tanggal 19 Juni 2017 bahwa Pusat Penelitian Oseanografi (P2O) Lembaga Ilmu Pengetahuan Indonesia (LIPI) ditunjuk sebagai Executing Agency Project Coremap CTI IBRD 8336 ID dan seluruh pengeluaran dibebankan pada Category 4 sehingga sejak Juni 2017, seluruh pengeluaran atas Pembiayaan Belanja Modal Project Coremap CTI IBRD Loan 8336 ID akan menjadi aset P2O LIPI. Rincian Pembiayaan Belanja Modal Coremap-CTI IBRD Loan 8336 ID yang menjadi aset P2O LIPI, sebagai berikut. Tabel 2. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2017 25 Tabel 3. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2018 26 27 Tabel 4. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2019 28 Tabel 5. Rincian Belanja Modal Coremap CTI IBRD Loan 8336 ID Tahun 2020 29 30 31 32 33 TABEL 6. RINCIAN BELANJA MODAL COREMAP-CTI IBRD LOAN 8336-ID TAHUN 2021 No. No. SP2D Nilai Jenis Belanja Status Ketera 1 210881302001089 3.732.586.683 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 1 Pembangunan Gedung ngan Pusat Data Nasional Bangunan Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 2 210881302001170 90.071.250 PT. Wahanacipta Belanja Modal Gedung dan Termin 1 Paket Pekerjaan Pengadaan Jasa Konsultansi Bangunwisma Bangunan Manajemen Konstruksi Pembangunan Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja 3 210881302001987 3.820.291.833 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 2 Pembangunan Gedung Pusat Data Nasional Bangunan Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 4 210881302001987 1.767.299.245 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 3 Pembangunan Gedung Pusat Data Nasional Bangunan Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 5 210881303002272 3.687.326.915 PT Anugerah Bangun Belanja Modal Gedung dan Termin 100% Pembangunan Gedung Laboratorium BBIL Kencana Bangunan Mataram 6 210881302002644 1.767.299.245 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 4 LIPI Pembangunan Gedung Pusat Data Nasional Bangunan Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 7 210881302003294 67.345.387 PT. Wahanacipta Belanja Modal Gedung dan Termin 2 Paket Pekerjaan Pengadaan Jasa Konsultansi Bangunwisma Bangunan Manajemen Konstruksi Pembangunan Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja 34 No. No. SP2D Nilai Jenis Belanja Status Ket 8 210881302003319 2.391.845.920 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 5 Pembangunan Gedung eraPusat Data Nasional Bangunan nga Ekosistem Pesisir, Laboratorium dan n Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 9 210881302004799 2.557.936.220 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 6 Pembangunan Gedung Pusat Data Nasional Bangunan Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 10 210881302006336 2.557.936.220 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 7 Pembangunan Gedung Pusat Data Nasional Bangunan Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 11 210881302008477 555.239.120 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 8 Pembangunan Gedung Pusat Data Nasional Bangunan Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 12 210881302009782 3.654.194.600 PT. APIK-BSP, KSO Belanja Modal Gedung dan Termin 9 Pembangunan Gedung Pusat Data Nasional Bangunan Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 (Delapan) 13 210881302010248 242.790.000 PT Jakarta Belanja Modal Perencanaan Termin Paket Pekerjaan Pengadaan Jasa Konsultansi Konsultindo dan Pengawasan Gedung dan Pengawasan Perencanaan Detail Engineering Design Bangunan Berkala (DED) dan UKL-UPL Pembangunan Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI Bertingkat 8 (Delapan) 35 No. No. SP2D Nilai Jenis Belanja Status Ket 14 210881302019653 180.142.500 PT. Wahanacipta Belanja Modal Gedung dan Termin era Paket Pekerjaan Pengadaan Jasa Konsultansi Bangunwisma Bangunan Pemeliharaan Manajemen Konstruksi ngaPembangunan n Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja 36 No. No. SP2D Nilai Jenis Belanja Status Ket 15 210881701028506 41.022.900 PT Narada Karya Belanja Modal Termin era Gedung Pengawasan Pembangunan Gedung dan Pemeliharaan Laboratorium nga 16 210881303012997 83.002.500 PT Dekoruma Niaga Sejahtera Bangunan Belanja Modal Budidaya Pengadaan BBIL Mataram Jasa n LIPI Konsultasi Desain Interior Perencanaan Gedung dan Pengawasan Pusat Data Nasional Ekosistem Pesisir, 17 210881302015386 76.075.000 PT Inkoneksi Izi Konsultan dan Gedung Modal Belanja Laboratorium Jasa Konsultandan Ruang Kerja Perencana P2O Interior dan Bangunan Lainnya Eksterior Stasiun Penelitian Pulau Pari dan Interior 18 210881302012290 40.000.000 CV Akbar Abadi Jaya Belanja Ruang KerjaPintu Pagar Gedung BBIL Pengadaan Penambahan Nilai Kepala OR Kebumian 19 210881303014007 466.226.000 PT Home Center Indonesia Gedung dan Belanja Modal E-Purchasing Pengadaan Belanja Moda Bangunan dan Peralatan Peralatan dan Mesin Mesin Berupa Meubelair Perkantoran BBIL 20 210881303012407 46.233.727 PT Sejahtera Bali Furindo Belanja Modal Paket 1 E-Purchasing Pengadaan Belanja Moda Peralatan dan Peralatan dan Mesin Mesin Berupa Meubelair Perkantoran BBIL 21 210881303012168 81.568.181 PT Datascrip Belanja Modal paket 2 E-Purchasing Pengadaan Belanja Modal Peralatan dan Peralatan Mesin dan Mesin Berupa Meubelair 22 210881301020276 1.520.000.000 PT Dexatama Niaga Labtekindo Belanja Modal Perkantoran BBIL (Paket Pengadaan Belanja Modal3)Peralatan dan Peralatan dan Mesin 23 210881303015225 2.512.429.500 PT Karya Mentari Seraya Mesin Belanja Modal Uang Muka Berupa Furniture Pengadaan Laboratorium Belanja Bio Industri Modal Peralatan dan Peralatan dan Laut Mesin Mesin Berupa Interior Laboratorium Gedung Pusat Data Nasional Ekosistem Pesisir 24 210881303024308 4.019.887.201 PT Karya Mentari Seraya Belanja Modal Termin 1 Pusat Penelitian Pengadaan Oseanografi Belanja Modal Peralatan dan Peralatan dan Mesin Mesin Berupa Interior Laboratorium Gedung Pusat Data Nasional Ekosistem Pesisir Pusat Penelitian Oseanografi 37 No. No. SP2D Nilai Jenis Belanja Status Keterangan 25 210881303024293 3.014.915.400 PT Karya Mentari Belanja Modal Peralatan Termin 2 Pengadaan Belanja Modal Peralatan dan Mesin Seraya dan Mesin Berupa Interior Laboratorium Gedung Pusat Data Nasional Ekosistem Pesisir Pusat Penelitian Oseanografi 26 210881303024271 3.014.915.401 PT Karya Mentari Belanja Modal Peralatan Termin 3 Pengadaan Belanja Modal Peralatan dan Mesin Seraya dan Mesin Berupa Interior Laboratorium Gedung Pusat Data Nasional Ekosistem Pesisir Pusat Penelitian Oseanografi 27 210881303024005 4.383.000.000 PT Esco Utama Belanja Modal Peralatan Pengadaan Belanja Modal Peralatan dan Mesin dan Mesin Berupa Alat Fume Hood 28 210881303023417 8.312.700.000 PT Dexatama Belanja Modal Peralatan Pengadaan Belanja Modal Peralatan dan Mesin Niaga Labtekindo dan Mesin Berupa Peralatan Riset Oseanografi 29 210881302017971 145.409.091 PT Astragraphia Belanja Modal Peralatan E-Purchasing Belanja Modal Pearalatan dan Mesin Xprins Indonesia dan Mesin Berupa Smart TV Digital Signage 30 210881303006016 74.250.000 PT TRIASIH CIPTA Belanja Modal Peralatan Pengadaan Belanja Modal Peralatan dan Mesin JAYA dan Mesin Berupa Perangkat Pengolah Data Oseanografi 31 210881701010847 31.000.000 PT Semeton Listrik Belanja Modal Peralatan Pengadaan Penambahan Jaringan ListriK BBIL 32 210881701003013 2.724.800 Elektrikal dan Mesin Belanja Modal Peralatan Belanja Modal Peralatan dan Mesin berupa Vernier dan Mesin digital calipper Mitutoyo 300mm Sigmat 33 210881701005431 3.003.500 Belanja Modal Peralatan Pengadaan Alat Kegiatan BBIL dan Mesin 34 210881303012553 90.750.000 CV Fajar Laksana Belanja Modal Peralatan Pengadaan Belanja Modal Peralatan Pendukung dan Mesin Laboratorium BBIL 35 210881303016807 49.500.000 CV Graha Tri Putra Belanja Modal Lainnya Pengadaan Pengadaan Jasa Pembuatan Aplikasi MonMang 2.0 versi iOS 36 210881302014054 20.412.727 PT Elo Karsa Belanja Modal Peralatan E-Purchasing Pengadaan Belanja Modal Peralatan Utama dan Mesin dan Mesin Berupa Micropipet Multichannel 37 210881302020444 96.988.182 PT Medquest Jaya Belanja Modal Peralatan E-Purchasing Pengadaan Belanja Modal Peralatan Global dan Mesin dan Mesin Berupa Elisa Washer 38 210881303015594 51.971.055 PT Mita Matari Belanja Modal Peralatan E-Purchasing Pengadaan Belanja Modal Peralatan dan Mesin Mesin dan Mesin Berupa Instrument Cabinet 38 No. No. SP2D Nilai Jenis Belanja Status Keterangan 39 210881303019796 12.530.000 PT Home Center Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan Indonesia Peralatan dan Mesin dan Mesin Berupa Loker dan Meja Tamu 40 210881303015467 74.597.273 PT. AIRMAS MATARAM Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan INTERNUSA Peralatan dan Mesin dan Mesin Berupa UPS 41 210881303016311 68.767.273 PT. AIRMAS MATARAM Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan INTERNUSA Peralatan dan Mesin dan Mesin Berupa Papan Tulis Digital 42 210881301021629 12.792.104 PT. AIRMAS MATARAM Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan INTERNUSA Peralatan dan Mesin dan Mesin Berupa Smart TV 43 210881301022164 39.077.273 PT. EMIINDO JAYA Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan BERSAMA Peralatan dan Mesin dan Mesin Berupa UV Sterilizier 44 210881301021629 5.919.545 PT. AIRMAS MATARAM Belanja Modal E-Purchasing Belanja Modal Peralatan dan Mesin INTERNUSA Peralatan dan Mesin Berupa Mesin Penghancur Kertas 45 210881701028506 66.328.000 CV. Wahyu Fajar Belanja Penambahan Pengadaan Pemasangan Stiker Sandblast dan Nilai Backdrop 46 210881303020933 198.413.000 CV Wisata Karya dan Gedung Modal Belanja Pengadaan Tirai Roller Blind dan Smoke Ring Gorden Bangunan Peralatan dan Mesin Gedung Balai Bio Industri Laut 47 210881303024136 144.814.000 CV. MEDIA GLOBAL Belanja Modal Pengadaan Pengolah Data dan Komunikasi Berupa MANDIRI Peralatan dan Mesin Wifi, CCTV dan Sound System 48 210881303024072 193.000.000 CV. Wisata Karya Belanja Modal Pengadaan Furniture dan Kelengkapan Kantor BBIL Peralatan dan Mesin 49 210881303019119 226.363.636 PT. New Module Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan dan International Peralatan dan Mesin Mesin Berupa Mikroskop Fluorescence dan Kamera Mikroskop 50 210881302014819 98.181.818 PT Elo Karsa Utama Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan Peralatan dan Mesin dan Mesin Berupa Biosafety Cabinet 51 210881303017252 15.454.545 PT. Bhinneka Mentari Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan Dimensi Peralatan dan Mesin dan Mesin Berupa UPS 3KVA 52 210881303016804 23.790.000 PT. Home Center Belanja Modal E-Purchasing Pengadaan Belanja Modal Peralatan Indonesia Peralatan dan Mesin dan Mesin Berupa Rak Penyimpanan 53 210881303019087 35.700.000 PT New Module Belanja Modal Lainnya Pengadaan Imaging Software International 39 No. No. SP2D Nilai Jenis Belanja Status Ke 54 210881302019360 115.454.545 PT Elo Karsa Utama Belanja Modal Peralatan dan ter E-Purchasing Belanja Modal Peralatan dan Mesin an Cabinet BBIL Mesin Berupa Biosafety ga 55 210881303021282 185.000.000 PT. TRIASIH CIPTA JAYA Belanja Modal Peralatan dan Pengadaan Belanja Modal n Peralatan dan Mesin Mesin Berupa Perangkat Pengolah Data 56 210881303023458 23.000.000 PT. TRIASIH CIPTA JAYA Belanja Modal Peralatan dan Pengadaan Scanner dan Infocus Portable Mesin TOTAL 56.789.473.315 40 LAMPIRAN-LAMPIRAN LAMPIRAN I Statement of Expenditures for those NOT Subject to Prior Review for the Reporting Period of Jan 01 to Dec 31, 2021 1 2 3 3a 3b 4 5 6 7 8 9 10 11 12 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 1 (1) WORKS, TRAINING AND WORKSHOP, CONSULTANTS SERVICES, GOODS, INCREMENTAL OPERATING COST Subtotal - - - - (2) GRANT Subtotal - - - - (3) SCHOLARSHIP Subtotal - - - - (4) WORKS, TRAINING AND WORKSHOP, CONSULTANTS 1 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Bappenas 211401105000157 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri dan Hibah COREMAP-CTI a.n Rizkie Satriya Utama 2 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 140 Khusus Pinjaman Bappenas 211401105000154 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Kristina Setiani dan Hibah 3 Component 1 Pemb. Tunjangan Biaya Hidup dll Program S3 Periode 140 Khusus Pinjaman Bappenas 211401105000155 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI dan Hibah a.n Fawzan Bhakti Soffa 4 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 140 Khusus Pinjaman Bappenas 211401105000161 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Samuel Radityo dan Hibah Adiprabowo 5 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 140 Khusus Pinjaman Bappenas 211401105000163 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Muhammad H dan Hibah Ghifari 6 Component 1 Pemb Bench Fees Fall 2020 - Spring 2021 dll Diklat S2 140 Khusus Pinjaman Bappenas 211401105000158 29 Januari 2021 350.434.000,00 100,00% 350.434.000,00 14.000,00 25.031,00 Luar Negeri Coremap-CTI utk Alan Ray Farandy dkk 5 Org dan Hibah an University of Rhode Island 7 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 140 Khusus Pinjaman Bappenas 211401105000162 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Fauzan Hidayat dan Hibah 8 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 140 Khusus Pinjaman Bappenas 211401105000164 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Joyke Fredy dan Hibah Bastian Rumajar 9 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Bappenas 211401105000156 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri dan Hibah COREMAP-CTI a.n FNU Hariono 10 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S3 140 Khusus Pinjaman Bappenas 211401105000153 29 Januari 2021 45.654.000,00 100,00% 45.654.000,00 14.000,00 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri dan Hibah COREMAP-CTI a.n Diky Suganda 11 Component 1 Pemb. Bench Fees Spring - Fall 2021 dll Diklat S2, S3 Luar 140 Khusus Pinjaman Bappenas 211401105000204 09 Februari 2021 630.434.000,00 100,00% 630.434.000,00 14.000,00 45.031,00 Negeri COREMAP-CTI utk Fauzan Hidayat dkk 9 Org an dan Hibah University of Rhode Island 12 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Bappenas 211401105000205 09 Februari 2021 28.770.000,00 100,00% 28.770.000,00 14.000,00 2.055,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri dan Hibah COREMAP-CTI a.n Alan Ray Farandy 13 Component 1 Pembayaran Belanja Modal Berupa Pembayaran Jasa 088 Jakarta III LIPI 210881302001089 8 Februari 2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 3.732.586.620,00 100,00% 3.732.586.620,00 14.000,00 266.613,33 Konstruksi Pembangunan Gedung Pusat Data Nasional , 11 November 2019 Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 14 Component 1 Pembayaran International Travel Program Diklat S2 Luar 140 Khusus Pinjaman Bappenas 211401302000001 09 Februari 2021 41.338.080,00 100,00% 41.338.080,00 14.000,00 2.952,72 Negeri Coremap-CTI utk Lutfi Felanie, dkk 3 orang a.n PT. dan Hibah Jendela Dunia Wisata 15 Component 1 Pembayaran Termin I Paket Pekerjaan Manajemen 088 Jakarta III LIPI 210881302001170 10 Februari 2021 1416/IPK.2.03/LK/V/2019, PT. WAHANA CIPTA 90.071.254,08 100,00% 90.071.254,08 13.989,00 6.438,72 Konstruksi Pembangunan Gedung Pusat Data Nasional 10 Mei 2019 BANGUNWISMA Ekosistem Pesisir, Laboratorium dan Ruang Kerja, sesuai dengan SPK Nomor: 1416/IPK.2.03/LK/V/2019 tanggal 10 Mei 16 Component 1 Pem Tunj Keberangkatan dan Transfer Fee Program S2 140 Khusus Pinjaman Bappenas 211401105000206 10 Februari 2021 46.203.750,00 100,00% 46.203.750,00 13.875,00 3.330,00 LN Per Tahun 2021 Pend dan Pel Diklat Gelar LN dan Hibah COREMAP-CTI a.n Alan Ray Farandy 17 Component 1 Pemb. International Travel Program S2 Diklat Gelar Luar 140 Khusus Pinjaman Bappenas 211401302000005 11 Februari 2021 33.582.772,50 100,00% 33.582.772,50 13.875,00 2.420,38 Negeri Coremap-CTI utk Desak Made Pera Rosita Dewi an dan Hibah PT. Jendela Dunia Wisata Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 18 Component 1 Pembayaran Termin II Pekerjaan Pembangunan Gedung 088 Jakarta III LIPI 210881302001349 15 Februari 2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 3.820.291.856,25 100,00% 3.820.291.856,25 13.875,00 275.336,35 Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan , 11 November 2019 Ruang Kerja Pusat Penelitian Oseanografi 19 Component 1 Pembayaran International Travel Program S2 Diklat Gelar 140 Khusus Pinjaman Bappenas 211401302000002 11 Februari 2021 33.582.772,50 100,00% 33.582.772,50 13.875,00 2.420,38 Luar Negeri Coremap-CTI untuk Alan Ray Farandy a.n PT. dan Hibah Jendela Dunia Wisata 20 Component 1 Pemb International travel Prog S2 LN Pend dan Pel Diklat 140 Khusus Pinjaman Bappenas 211401302000006 11 Februari 2021 32.343.318,75 100,00% 32.343.318,75 13.875,00 2.331,05 Gelar LN CoremapCTI utk Ita Wulandari a.n PT. Jendela dan Hibah Dunia Wisata 22 Component 1 Pemb International travel Prog S2 LN Pend dan Pel Diklat 140 Khusus Pinjaman Bappenas 211401302000004 11 Februari 2021 33.582.772,50 100,00% 33.582.772,50 13.875,00 2.420,38 Gelar LN CoremapCTI utk Meydar Hapsary Saleh a.n PT. dan Hibah Jendela Dunia Wisata 23 Component 3 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301001796 24 Februari 2021 Bendahara Pengeluaran 43.105.999,95 100,00% 43.105.999,95 14.089,00 3.059,55 Barang (COREMAP) Dari Bendahara Pengeluaran (Jakarta) 24 Component 1 Pem Tunj Keberangkatan dan Transfer Fee Program S2 140 Khusus Pinjaman Bappenas 211401105000291 26 Februari 2021 47.619.000,00 100,00% 47.619.000,00 14.300,00 3.330,00 LN Per Tahun 2021 Pend dan Pel Diklat Gelar LN dan Hibah COREMAP-CTI a.n Meydar H Saleh 25 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105000292 26 Februari 2021 29.386.500,00 100,00% 29.386.500,00 14.300,00 2.055,00 Negeri Periode Feb - Mar 2021 COREMAP-CTI a.n Desak dan Hibah Made Pera Rosita Dewi 26 Component 1 Pemb Tunj Keberangkatan dan Transfer Fee Program S2 140 Khusus Pinjaman Bappenas 211401105000293 26 Februari 2021 47.619.000,00 100,00% 47.619.000,00 14.300,00 3.330,00 LN Periode Tahun 2021 Diklat Gelar LN COREMAP-CTI a.n dan Hibah Desak Made Pera Rosita Dewi 27 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Bappenas 211401105000294 26 Februari 2021 29.386.500,00 100,00% 29.386.500,00 14.300,00 2.055,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri dan Hibah COREMAP-CTI a.n Meydar H Saleh 28 Component 3 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301001862 25 Februari 2021 Bendahara Pengeluaran 26.825.942,00 100,00% 26.825.942,00 14.300,00 1.875,94 Perjalanan Dinas ke Mataram -NTB, dalam rangka pendampingan kegiatan pemeriksaan cek fisik oleh BPK RI atas Pekerjaan Pembangunan Gedung Laboratorium 30 BBIL Mataram Component 1 Pemb LIPI, Tunj Keberangkatan dll Prog S2 LN Periode Th 140 Khusus Pinjaman Bappenas 211401105000325 5 Maret 2021 49.407.498,00 100,00% 49.407.498,00 14.371,00 3.438,00 2021 Pend dan Pel Diklat Gelar LN COREMAP-CTI a.n Ita dan Hibah Wulandari 31 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Feb-Maret 140 Khusus Pinjaman Bappenas 211401105000324 5 Maret 2021 17.044.006,00 100,00% 17.044.006,00 14.371,00 1.186,00 2021 Pend dan Pel Diklat Gelar LN COREMAP-CTI a.n ita dan Hibah Wulandari 32 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301002376 4 Maret 2021 Bendahara Pengeluaran 71.729.828,59 100,00% 71.729.828,59 14.371,00 4.991,29 Barang (PHLN-COREMAP) Dari Bendahara Pengeluaran 33 Component 2 (Jakarta) Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301002569 5 Maret 2021 Bendahara Pengeluaran 50.399.959,26 100,00% 50.399.959,26 14.371,00 3.507,06 Perjalanan Dinas (PHLN-COREMAP) dalam rangka Melakukan kegiatan Dinamika Karbon Perairan 34 Ekosistem Pesisir Component 2 Pembayaran pada Belanja Pulau(PHLN-COREMAP) Barang dengan Variabilitas Genesis berupa 088 Jakarta III LIPI 210881301002305 3 Maret 2021 Bendahara Pengeluaran 31.250.026,92 100,00% 31.250.026,92 14.371,00 2.174,52 pembayaran perjalanan dinas dalam rangka pelaksanaan FGD kick Off Coremap Legacy Study dan keterbacaan kuisioner asesmen potensi dampak COREMAP CTI,ke Bogor, tanggal3- 5 Maret 2021 35 Component 1 Pembayaran Belanja Modal (PHLN-COREMAP) berupa 088 Jakarta III LIPI 210881302001987 2 Maret 2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 1.767.299.305,38 100,00% 1.767.299.305,38 14.371,00 122.976,78 Pembayaran Termin III Pekerjaan Pembangunan Gedung , 11 November 2019 Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI 36 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN 140 Khusus Pinjaman Bappenas 211401105000339 9 Maret 2021 17.159.048,00 100,00% 17.159.048,00 14.468,00 1.186,00 Periode Feb-Maret 2021 Diklat Gelar LN COREMAP-CTI dan Hibah a.n Restya Rahmaniar 37 Component 1 Pemb Tunjangan Keberangkatan dan Transfer Fee 140 Khusus Pinjaman Bappenas 211401105000342 15 Maret 2021 48.732.840,00 100,00% 48.732.840,00 14.418,00 3.380,00 Program S2 LN Periode Tahun 2021 Diklat Gelar LN dan Hibah COREMAP-CTI a.n Restya Rahmaniar 38 Component 1 Pembayaran Belanja Barang Berupa Pembayaran 088 Jakarta III LIPI 210881301002882 10 Maret 2021 Bendahara Pengeluaran 169.456.051,62 100,00% 169.456.051,62 14.418,00 11.753,09 Perjalanan Dinas (PHLN- COREMAP) dalam rangka kegiatan Reef Health Monitoring di Kabupaten Tapanuli Tengah tanggal 13-23 Maret 2021 39 Component 3 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301002967 12 Maret 2021 Bendahara Pengeluaran 39.901.094,10 100,00% 39.901.094,10 14.418,00 2.767,45 Barang (PHLN- COREMAP-053) Dari Bendahara Pengeluaran (Jakarta) 40 Component 1 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301003100 15 Maret 2021 Bendahara Pengeluaran 131.043.039,30 100,00% 131.043.039,30 14.418,00 9.088,85 perjalanan dinas (PHLN- COREMAP-051) dalam rangka kegiatan verifikasi Tempat Uji Kompetensi (TUK) ke Universitas Bangka Belitung tanggal 16 s.d. 19 Maret 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 41 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301003099 15 Maret 2021 Bendahara Pengeluaran 162.900.042,84 100,00% 162.900.042,84 14.418,00 11.298,38 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan pengambilan data monitoring kesehatan terumbu karang dan ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) 42 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301002844 10 Maret 2021 Bendahara Pengeluaran 45.500.036,04 100,00% 45.500.036,04 14.418,00 3.155,78 perjalanan dinas (PHLN- COREMAP) dalam rangka Kegiatan Penelitian Ketahanan Wilayah Pesisir Jawa Utara terhadap Bahaya Amblesan Tanah tanggal 15 - 26 Maret 2021 di Pekalongan 43 Component 1 Pembayaran Belanja Modal (PHLN-COREMAP) berupa 088 Jakarta III LIPI 210881303002272 12 Maret 2021 4414/IPK.2.03/LK/XII/2019, PT Anugrah Bangun Kencana 3.325.114.051,56 100,00% 3.325.114.051,56 14.418,00 230.622,42 Pembayaran Pekerjaan Penyelesaian Pembangungan Tanggal 16 Desember 2019 Gedung Laboratorium BBIL Mataram LIPI 44 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302002644 15 Maret 2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 1.767.299.182,02 100,00% 1.767.299.182,02 14.418,00 122.575,89 berupa Pembayaran Termin IV Pekerjaan Pembangunan , 11 November 2019 Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium Dan Ruang Kerja Pusat Oseanografi Lipi 45 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301002966 12 Maret 2021 Bendahara Pengeluaran 33.381.995,40 100,00% 33.381.995,40 14.418,00 2.315,30 Barang (PHLN- COREMAP-052), Dari Bendahara Pengeluaran (Jakarta) 46 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301002916 12 Maret 2021 Bendahara Pengeluaran 31.780.011,42 100,00% 31.780.011,42 14.418,00 2.204,19 Perjalanan Dinas (PHLN- COREMAP-052) dalam rangka Melakukan kegiatan Evaluasi Tingkat Penyerapan dan Pelepasan Karbon dari Budidaya Makroalga Menggunakan Pendekatan Life Cycle Assessment (LCA) 47 Component 1 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301002965 12 Maret 2021 Bendahara Pengeluaran 6.248.040,30 100,00% 6.248.040,30 14.418,00 433,35 Barang (PHLN-COREMAP-051) Dari Bendahara Pengeluaran (Jakarta) 48 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105000374 18 Maret 2021 235.131.780,00 100,00% 235.131.780,00 14.412,00 16.315,00 Negeri Coremap-CTI untuk Karyasiswa Restya Rahmaniar dan Hibah an University of Rhode Island 49 Component 1 Pemb Tuition Fee Spring 2021 dll Program S2 Luar Negeri 140 Khusus Pinjaman Bappenas 211401105000362 18 Maret 2021 210.011.664,00 100,00% 210.011.664,00 14.412,00 14.572,00 Coremap-CTI Karyasiswa Samuel Radityo Adiprabowo an dan Hibah University of Rhode Island 50 Component 1 Pemb. TF Spring 2021 dll Program S2 Luar Negeri 140 Khusus Pinjaman Bappenas 211401105000377 18 Maret 2021 236.155.032,00 100,00% 236.155.032,00 14.412,00 16.386,00 Coremap-CTI Karyasiswa Desak Made Pera Rosita Dewi dan Hibah a.n University of Rhode Island 51 Component 1 Pemb TF Spring 2021 dll Prog S2 Diklat Gelar LN Coremap- 140 Khusus Pinjaman Bappenas 211401105000373 18 Maret 2021 235.362.372,00 100,00% 235.362.372,00 14.412,00 16.331,00 CTI Utk Karyasiswa Alan Ray Farandi a.n Univ of Rhode dan Hibah Island 52 Component 1 Pemb. Tuition Fee Spring 2020 dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105000353 18 Maret 2021 211.885.224,00 100,00% 211.885.224,00 14.412,00 14.702,00 Negeri Coremap-CTI Karyasiswa Kristina Resmi Setiani a.n dan Hibah University of Rhode Island 53 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN 140 Khusus Pinjaman Bappenas 211401105000376 18 Maret 2021 212.966.124,00 100,00% 212.966.124,00 14.412,00 14.777,00 Coremap-CTI utk Karyasiswa Muhammad Hafizh Ghifari. dan Hibah a.n University of Rhode Island 54 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105000361 18 Maret 2021 210.011.664,00 100,00% 210.011.664,00 14.412,00 14.572,00 Negeri Coremap-CTI Karyasiswa Rizkie Satriya Utama a.n dan Hibah University of Rhode Island 55 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105000379 18 Maret 2021 235.362.372,00 100,00% 235.362.372,00 14.412,00 16.331,00 Negeri Coremap-CTI Karyasiswa Meydar Hapsari Saleh dan Hibah a.n University of Rhode Island 56 Component 1 Pembayaran TF Spring 2021 dll Prog S2 LN Diklat Gelar 140 Khusus Pinjaman Bappenas 211401105000354 18 Maret 2021 211.885.224,00 100,00% 211.885.224,00 14.412,00 14.702,00 LN Coremap-CTI utk Karyasiswa Fauzan Hidayat. a.n dan Hibah University of Rhode Island 57 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105000363 18 Maret 2021 210.011.664,00 100,00% 210.011.664,00 14.412,00 14.572,00 Negeri Coremap-CTI Karyasiswa Fawzan Bhakti Soffa a.n dan Hibah University of Rhode Island 58 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN 140 Khusus Pinjaman Bappenas 211401105000378 18 Maret 2021 236.947.692,00 100,00% 236.947.692,00 14.412,00 16.441,00 Coremap-CTI utk Karyasiswa Ita Wulandari a.n Univ of dan Hibah Rhode Island 59 Component 1 Pemb. Tuition Fee Spring 2021 dll S2 Luar Negeri 140 Khusus Pinjaman Bappenas 211401105000352 18 Maret 2021 211.885.224,00 100,00% 211.885.224,00 14.412,00 14.702,00 Coremap-CTI Karyasiswa Joyke Fredy Bastian Rumajar dan Hibah a.n University of Rhode Island 60 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN 140 Khusus Pinjaman Bappenas 211401105000375 18 Maret 2021 162.163.824,00 100,00% 162.163.824,00 14.412,00 11.252,00 Coremap-CTI utk Karyasiswa Hariono Hariono. a.n dan Hibah University of Rhode Island 61 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301003388 18 Maret 2021 Bendahara Pengeluaran 29.649.087,00 100,00% 29.649.087,00 14.412,00 2.057,25 Barang (PHLN,COREMAP,052), dari BPP.1 (Ambon) Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 62 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301003751 24 Maret 2021 Bendahara Pengeluaran 164.770.064,78 100,00% 164.770.064,78 14.446,00 11.405,93 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka kegiatan Reef Health Monitoring di Kabupaten Kepulauan Mentawai, Sumatera Barat, tanggal 29 Maret s.d 09 April 2021 63 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301003775 24 Maret 2021 Bendahara Pengeluaran 24.390.048,56 100,00% 24.390.048,56 14.446,00 1.688,36 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan RISET COREMAP CTI 2021-2022, di Sumbawa, Nusa Tenggara Barat, tanggal 5 s.d. 8 April 2021 64 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302003294 29 Maret 2021 1416/IPK.2.03/LK/V/2019, PT. Wahana Cipta 67.345.338,60 100,00% 67.345.338,60 14.481,00 4.650,60 berupa pembayaran termin II Pekerjaan Jasa Konsultansi 10 Mei 2019 Bangunwisma Manajemnen Konstruksi Pembangunan Gedung pusat data nasional ekosistem pesisir, 65 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302003319 30 Maret 2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 2.391.845.884,92 100,00% 2.391.845.884,92 14.481,00 165.171,32 berupa Pembayaran termin V, Pekerjaan Pembangunan , 11 November 2019 Gedung Pusat Data Nasional Ekosistem Pesisir Laboratorium Dan Ruang Kerja Pusat Oseanografi LIPI 66 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301004168 31 Maret 2021 Bendahara Pengeluaran 71.452.781,96 100,00% 71.452.781,96 14.572,00 4.903,43 Barang (PHLN,COREMAP,052) dari BP Pusat Jakarta 67 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301004195 1-Apr-2021 27.029.945,30 100% 27.029.945,30 14.533,01 1.859,90 Barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20020 Tanggal 31 Maret 2021 68 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301004342 5-Apr-2021 206.681.928,37 100% 206.681.928,37 14.533,01 14.221,55 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan Riset Peningkatan Kapasitas COREMAP CTI LIPI tahun 2021/2022 tanggal 03 s.d. 09 April 2021 di Prov. Nusa Tenggara Barat 69 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301004466 6-Apr-2021 57.366.441,03 100% 57.366.441,03 14.533,01 3.947,32 Barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20022 Tanggal 6 April 2021 70 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN 140 Khusus Pinjaman Bappenas 211401105000484 06 April 2021 70.862.956,76 100% 70.862.956,76 14.533,01 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI dan Hibah a.n Fauzan Hidayat 71 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN April 140 Khusus Pinjaman Bappenas 211401105000485 06 April 2021 70.862.956,76 100% 70.862.956,76 14.533,01 4.876,00 - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Joyke Fredy dan Hibah Bastian Rumajar 72 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN 140 Khusus Pinjaman Bappenas 211401105000483 06 April 2021 70.862.956,76 100% 70.862.956,76 14.533,01 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI dan Hibah a.n FNU Hariono 73 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301004547 7-Apr-2021 106.028.059,49 100% 106.028.059,49 14.513,00 7.305,73 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti kegiatan uji kompetensi di Tempat Uji Kompetensi (TUK) Sewaktu Universitas Bangka Belitung tanggal 8 s.d. 12 April 2021 74 Component 1 Pembayaran Tunjangan Biaya Hidup dll Prog S2 LN 140 Khusus Pinjaman Bappenas 211401105000509 08 April 2021 66.600.157,00 100% 66.600.157,00 14.513,00 4.589,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI dan Hibah a.n Kristina Setiani 75 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105000496 06 April 2021 70.765.388,00 100% 70.765.388,00 14.513,00 4.876,00 Negeri Periode Apr - Jun 2021 COREMAP-CTI a.n Samuel dan Hibah Radityo Adiprabowo 76 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN 140 Khusus Pinjaman Bappenas 211401105000512 08 April 2021 70.765.388,00 100% 70.765.388,00 14.513,00 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI dan Hibah a.n Alan Ray Farandy 77 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Apr-Jun 140 Khusus Pinjaman Bappenas 211401105000511 08 April 2021 70.765.388,00 100% 70.765.388,00 14.513,00 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Muhammad H dan Hibah Ghifari 78 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN 140 Khusus Pinjaman Bappenas 211401105000497 06 April 2021 70.765.388,00 100% 70.765.388,00 14.513,00 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI dan Hibah a.n Fawzan Bhakti Soffa 79 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN 140 Khusus Pinjaman Bappenas 211401105000513 08 April 2021 70.765.388,00 100% 70.765.388,00 14.513,00 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI dan Hibah a.n Meydar H Saleh 80 Component 1 Pembayaran Tunjangan Biaya Hidup dll Periode Apr - Jun 140 Khusus Pinjaman Bappenas 211401105000510 08 April 2021 70.765.388,00 100% 70.765.388,00 14.513,00 4.876,00 2021 Program S2 Luar Negeri COREMAP-CTI a.n Rizkie dan Hibah Satriya Utama 81 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301004796 9-Apr-2021 13.186.627,68 100% 13.186.627,68 14.631,00 901,28 Barang (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20027 Tanggal 9 April 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 82 Component 2 Pertanggungjawaban TUP untuk pembayaran Belanja 088 Jakarta III LIPI 210881701002861 13-Apr-2021 225.379.874,37 100% 225.379.874,37 14.631,00 15.404,27 Barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20030 Tanggal 12 April 2021 83 Component 1 Pembayaran Belanja Barang Berupa Pembayaran 088 Jakarta III LIPI 210881301004910 13-Apr-2021 194.110.062,24 100% 194.110.062,24 14.631,00 13.267,04 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka pelaksanaan Reef Health Monitoring RHM), tanggal 21 April s.d 01 Mei 2021, di Kabupaten Raja Ampat, Batanta Salawati 84 Component 3 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301004795 9-Apr-2021 3.166.002,09 100% 3.166.002,09 14.631,00 216,39 Barang (PHLN,COREMAP,053) dari BPP.4 Mataram, Sesuai SPP Nomor 20026 Tanggal 9 April 2021 85 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002665 9-Apr-2021 40.579.956,36 100% 40.579.956,36 14.631,00 2.773,56 barang (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20028 Tanggal 9 April 2021 86 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002864 13-Apr-2021 120.959.597,85 100% 120.959.597,85 14.631,00 8.267,35 barang (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20033 Tanggal 12 April 2021 87 Component 3 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301004746 8-Apr-2021 14.138.959,47 100% 14.138.959,47 14.631,00 966,37 Barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20024 Tanggal 8 April 2021 88 Component 1 Pertanggungjawaban TUP untuk keperluan Belanja 088 Jakarta III LIPI 210881701002863 13-Apr-2021 17.982.084,24 100% 17.982.084,24 14.631,00 1.229,04 Barang (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20032 Tanggal 12 April 2021 89 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002865 13-Apr-2021 9.422.071,38 100% 9.422.071,38 14.631,00 643,98 barang (PHLN,COREMAP,053) dari BPP.2 Cibinong, Sesuai SPP Nomor 20034 Tanggal 12 April 2021 90 Component 1 Penggantian Uang Persediaan Untuk Keperluan Belanja 088 Jakarta III LIPI 210881301004747 8-Apr-2021 44.090.957,43 100% 44.090.957,43 14.631,00 3.013,53 Barang (PHLN,COREMAP,051) dari BP Pusat Jakarta Sesuai SPP Nomor 20025 Tanggal 8 April 2021 91 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002860 13-Apr-2021 185.467.237,92 100% 185.467.237,92 14.631,00 12.676,32 barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20035 Tanggal 12 April 2021 92 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002862 13-Apr-2021 225.024,78 100% 225.024,78 14.631,00 15,38 Barang (PHLN,COREMAP,053) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20031 Tanggal 12 April 2021 93 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002961 15-Apr-2021 11.692.791,31 100% 11.692.791,31 14.633,00 799,07 barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20040 Tanggal 15 April 2021 94 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002962 15-Apr-2021 48.371.869,11 100% 48.371.869,11 14.633,00 3.305,67 barang (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20041 Tanggal 15 April 2021 95 Component 3 Pertanggungjawaban TUP Untuk Keperluan Belanja 088 Jakarta III LIPI 210881701002957 14-Apr-2021 14.396.530,72 100% 14.396.530,72 14.633,00 983,84 Barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20037 Tanggal 14 April 2021 96 Component 2 Pertanggungjawaban TUP untuk Keperluan Belanja 088 Jakarta III LIPI 210881701002956 14-Apr-2021 25.473.711,72 100% 25.473.711,72 14.633,00 1.740,84 Barang (PHLN,COREMAP,052) dari BPP.1 P2LD Ambon, Sesuai SPP Nomor 20036 Tanggal 14 April 2021 97 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002963 15-Apr-2021 41.448.996,81 100% 41.448.996,81 14.633,00 2.832,57 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20042 Tanggal 15 April 2021 98 Component 2 Pertanggungjawaban TUP untuk Keperluan Belanja 088 Jakarta III LIPI 210881701002958 14-Apr-2021 43.951.971,46 100% 43.951.971,46 14.633,00 3.003,62 Barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20038 Tanggal 14 April 2021 99 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701002959 14-Apr-2021 470.903.841,35 100% 470.903.841,35 14.633,00 32.180,95 barang (PHLN,COREMAP,051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20039 Tanggal 14 April 2021 100 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LNPeriode Apr-Jun 140 Khusus Pinjaman Bappenas 211401105000514 09 April 2021 71.350.508,00 100% 71.350.508,00 14.633,00 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Desak Made Pera dan Hibah Rosita Dewi 101 Component 1 Pembayaran Tunj Biaya Hidup Dll Program S2 LN Periode 140 Khusus Pinjaman Bappenas 211401105000538 13 April 2021 71.350.508,00 100% 71.350.508,00 14.633,00 4.876,00 Apr-Jun 2021 Diklat Gelar LN COREMAP-CTI a.n Restya dan Hibah Rahmaniar 102 Component 1 Pembayaran Tunjangan Biaya Hidup dll Prog S2 LN 140 Khusus Pinjaman Bappenas 211401105000539 13 April 2021 71.350.508,00 100% 71.350.508,00 14.633,00 4.876,00 Periode Apr-Jun 2021 Gelar LN COREMAP-CTI a.n Ita dan Hibah Wulandari 103 Component 1 Pertanggungjawaban TUP untuk keperluan Belanja 088 Jakarta III LIPI 210881701003013 15-Apr-2021 2.724.747,48 100% 2.724.747,48 14.508,00 187,81 Modal (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 10010 Tanggal 14 April 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 104 Component 2 Penggantian Uang Persediaan untuk keperluan belanja 088 Jakarta III LIPI 210881301005302 19-Apr-2021 39.364.991,64 100% 39.364.991,64 14.508,00 2.713,33 barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20043 Tanggal 16 April 2021 105 Component 2 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301005590 22-Apr-2021 30.309.931,70 100% 30.309.931,70 14.549,00 2.083,30 perjalanan dinas (PHLN,COREMAP,052) dalam rangka mengikuti kegiatan Pengambilan data Riset Penguatan Kapasitas (RPK) COREMAP CTI tahun 2021 di kota Merauke, tanggal 26 April s.d. 2 Mei 2021 106 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302004799 26-Apr-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 2.557.936.163,48 100% 2.557.936.163,48 14.489,00 176.543,32 berupa Pembayaran Termin VI, Pekerjaan Jasa Tanggal 11/11/2019 Konstruksi PembangunanGedung Pusat Data Nasional Ekosistem Pesisir Laboratoiun dan Ruang kerja Pusat Oseanografi LIPI, 107 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301005927 27-Apr-2021 59.878.400,52 100% 59.878.400,52 14.489,00 4.132,68 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta Sesuai SPP Nomor 20045 Tanggal 27 April 2021 108 Component 2 Pembayaran Belanja Barang Berupa Pembayaran 088 Jakarta III LIPI 210881303004783 28-Apr-2021 0426/PPK/IV/PK/KU/3/202 CV. FAJAR LAKSANA 64.760.016,30 100% 64.760.016,30 14.510,00 4.463,13 Pengadaan (PHLN,COREMAP ,052) Bahan Penelitian 1 Tanggal 22 Maret 2021 Optimasi Performa Produksi Benih Teripang Pasir Melalui Rekayasa Wadah dan Pakan Koordinator Lisa Fajar Indriana BBIL LIPI, 109 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301006093 28-Apr-2021 250.192.012,30 100% 250.192.012,30 14.510,00 17.242,73 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Pelatihan Asesor Kompetensi TA 2021 bersama Badan Nasional Sertifikasi Profesi (BNSP) tanggal 29 April s.d. 5 Mei 2021 di Bali 110 Component 2 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881303004781 28-Apr-2021 081/FKH/IF/04/2021 CV. Kharisma Scientific 42.280.979,20 100% 42.280.979,20 14.510,00 2.913,92 Pengadaan bahan Penelitian (PHLN,COREMAP,052) tanggal 16 April 2021 Penilaian Risiko Ikan Asing Invasif di Daerah Aliran Sungai dan Estuari Studi Kasus: DAS Ciliwung dan Kawasan Konservasi Mangrove Muara Angke Koord. Rahmi Dina P2L LIPI 111 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301006505 4-May-2021 136.272.051,17 100% 136.272.051,17 14.467,00 9.419,51 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti survei kegiatan pengambilan data guna penyusunan kajian akademis ICRG PES, tanggal 5 s.d. 11 Mei 2021 di Perairan Nusa Dua Bali 112 Component 2 Penggantian UP Untuk Keperluan Belanja barang 088 Jakarta III LIPI 210881301006504 4-May-2021 47.286.257,52 100% 47.286.257,52 14.467,00 3.268,56 (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20051 Tanggal 4 Mei 2021 113 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303005006 3-May-2021 0758/PPK/IV/PK/KU/4/202 PT. GRAND KOMODO TOURS 158.999.997,51 100% 158.999.997,51 14.467,00 10.990,53 berupa pembayaran Pengadaan Jasa Sewa Kapal untuk 1 tanggal 15 April 2021 kegiatan Penelitian Reef Health Monitoring secara Live On Boards di Raja Ampat Koordinator Ni Wayan Purnamasari P2O LIPI 114 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301007248 11-May-2021 11.002.456,14 100% 11.002.456,14 14.198,00 774,93 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20059 Tanggal 11 Mei 2021 115 Component 1 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301007249 11-May-2021 3.187.025,06 100% 3.187.025,06 14.198,00 224,47 (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 20060 Tanggal 11 Mei 2021 116 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005294 11-May-2021 5.300.539,34 100% 5.300.539,34 14.198,00 373,33 barang (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 20058 Tanggal 11 Mei 2021 117 Component 1 Pembayaran Belanja Modal (PHLN,COROEMAP,051) 088 Jakarta III LIPI 210881303006016 11-May-2021 0941/PPK/IV/PK/KU/4/202 PT. TRIASIH CIPTA JAYA 74.250.002,78 100% 74.250.002,78 14.198,00 5.229,61 berupa pembayaran Pengadaan Komputer Pendukung 1 tanggal 27 April 2021 Proses Data Pusat Penelitian Oseanografi LIPI sesuai SPK No: 0941/PPK/IV/PK/KU/4/2021 tanggal 27 April 2021, 118 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301006872 6-May-2021 28.026.568,04 100% 28.026.568,04 14.198,00 1.973,98 (PHLN,COREMAP,052) dari Bendahara Pengeluaran Pusat - Jakarta, Sesuai SPP Nomor 20053 Tanggal 5 Mei 2021 119 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301007073 10-May-2021 54.974.939,96 100% 54.974.939,96 14.198,00 3.872,02 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka dalam Kegiatan RHM CoremapCTI tanggal 18 s.d. 24 Mei 2021 dkk ke Pulau Pari, a.n. Susi Rahmawati,dkk 120 Component 1 Penggantian UP untuk Keperluan Belanja Barang 088 Jakarta III LIPI 210881301006871 6-May-2021 32.905.994,70 100% 32.905.994,70 14.198,00 2.317,65 (PHLN,COREMAP,051) dari Bendahara Pengeluaran Pusat- Jakarta Sesuai SPP Nomor 20052 Tanggal 5 Mei 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 121 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301007147 10-May-2021 68.239.989,38 100% 68.239.989,38 14.198,00 4.806,31 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Survei lapangan ke Kawasan Segara Anakan Cilacap tanggal 19 Mei s.d 25 Mei 2021, 122 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301006968 7-May-2021 36.487.156,24 100% 36.487.156,24 14.198,00 2.569,88 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20054 Tanggal 7 Mei 2021 123 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005434 17-May-2021 59.263.153,74 100% 59.263.153,74 14.203,00 4.172,58 barang (PHLN,COREMAP,051), dari BPP.5 P2O Jakarta Sesuai SPP Nomor 20063 Tanggal 17 Mei 2021 124 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005437 17-May-2021 5.582.915,24 100% 5.582.915,24 14.203,00 393,08 barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20065 Tanggal 17 Mei 2021 125 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005431 17-May-2021 3.003.508,41 100% 3.003.508,41 14.203,00 211,47 Modal (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 10014 Tanggal 17 Mei 2021 126 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005438 17-May-2021 131.945.017,82 100% 131.945.017,82 14.203,00 9.289,94 barang (PHLN,COREMAP,051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20066 Tanggal 17 Mei 2021 127 Component 2 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301007320 17-May-2021 82.740.002,59 100% 82.740.002,59 14.203,00 5.825,53 perjalanan dinas (PHLN,COREMAP,052) dalam rangka penelitian lapangan kegiatan Coral Reef Rehabilitation and Management Program-Coral Triangle Initiative Project tanggal 24 Mei s.d. 7 Juni 2021 128 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005433 17-May-2021 4.223.972,20 100% 4.223.972,20 14.203,00 297,40 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20062 Tanggal 17 Mei 2021 129 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005436 17-May-2021 55.859.972,91 100% 55.859.972,91 14.203,00 3.932,97 barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20064 Tanggal 17 Mei 2021 130 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005432 17-May-2021 2.980.641,58 100% 2.980.641,58 14.203,00 209,86 barang (PHLN,COREMAP,053) dari BPP.5. P2O Jakarta, Sesuai SPP Nomor 20061 Tanggal 17 Mei 2021 131 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301007540 19-May-2021 207.872.951,00 100% 207.872.951,00 14.300,00 14.536,57 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Kegiatan Riset Pengembangan Kapasitas Coremap CTI ke Pulau Rote , Nusa Tenggara Timur sesuai dengan Surat Tugas Nomor 3415/II/TU.01.01/4/2021, 132 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701005474 18-May-2021 45.545.786,00 100% 45.545.786,00 14.300,00 3.185,02 barang (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20067 Tanggal 17 Mei 2021 133 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301007900 24-May-2021 222.041.977,56 100% 222.041.977,56 14.362,00 15.460,38 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Mengikuti Kegiatan Monitoring Kesehata n Terumbu Karang dan Ekosistem Terkait (RHM) di Kepulauan Derawan, Berau, Kalimantan Timur, 134 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302006336 20-May-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 2.557.936.254,52 100% 2.557.936.254,52 14.362,00 178.104,46 berupa Pembayaran Termin VII Pekerjaan Pembangunan Tanggal 11/11/2019 Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI 135 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301007668 21-May-2021 443.690.005,46 100% 443.690.005,46 14.362,00 30.893,33 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Kegiatan Reef Health Monitoring Coremap-CTI ke Batam Kepulauan RIau dan Kepulauan Buton sesuai Surat Tugas nomor B-3801/II/TU.01.01/5/2021 136 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301007995 27-May-2021 140.061.987,00 100% 140.061.987,00 14.310,00 9.787,70 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Mengikuti kegiatan sertifikasi kompetensi di Tempat Uji Kompetensi (TUK) Sewaktu, Universitas Sam Ratulangi, Manado, Sulawesi Utara, 137 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301007997 27-May-2021 16.654.264,20 100% 16.654.264,20 14.310,00 1.163,82 (PHLN,COREMAP,052) dari BPP1.AMbon, Sesuai SPP Nomor 20071 Tanggal 25 Mei 2021 138 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301007996 27-May-2021 23.240.012,40 100% 23.240.012,40 14.310,00 1.624,04 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti survei kegiatan Riset Pengembangan Kapasitas Program Rehabilitasi dan Pengelolaan Terumbu Karang, Inisiatif Segitiga Karang Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 139 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302006753 28-May-2021 34/IGP/K/IV/2021 tanggal CV. Indo Graha Persada 44.737.066,80 100% 44.737.066,80 14.310,00 3.126,28 Berupa Pengadaan bahan untuk keperluan Pelatihan 29 April 2021 Asesor Kompetensi P2O LIPI Koord; Triyono, M.Si., sesuai Kwitansi Nomor: 34/IGP/K/IV/2021 tanggal 29 April 2021 140 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303006825 28-May-2021 037/AS/FK/V/2021 Tanggal CV. Aneka Sarana 41.916.995,10 100% 41.916.995,10 14.310,00 2.929,21 berupa Pengadaaan bahan Penelitian Isolasi dan 24 Mei Karakterisasi Mikroba Patogenik pada Sidat (Anguilla 2021 spp) Hasil Tangkapan Asal Pesisir Sungai CImandiri, Kab. Sukabumi, Jawa Barat 141 Component 1 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301008854 8-Jun-2021 46.612.066,74 100% 46.612.066,74 14.262,00 3.268,27 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan verifikasi Tempat Uji Kompetensi (TUK) di Univeritas Trunojoyo Madura tanggal 9 s.d 12 Juni 2021 142 Component 1 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301009053 9-Jun-2021 25.757.029,38 100% 25.757.029,38 14.262,00 1.805,99 perjalanan dinas (PHLN,COREMAP,051) dalam rangka menghadiri Kegiatan FGD dan Penyusuan Final Draft Kajian Akademis PES ICRG, tanggal 9 s.d. 10 Juni 2021 di Bogor, Jawa Barat 143 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301008902 8-Jun-2021 14.000.007,06 100% 14.000.007,06 14.262,00 981,63 perjalanan dinas (PHLN,COREMAP,052) dalam rangka mengikuti kegiatan Riset Pengembangan Kapasitas Program Rehabilitasi di Kabupaten Sukabumi pada tanggal 9 s.d. 13 Juni 2021 144 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301009075 9-Jun-2021 18.748.967,82 100% 18.748.967,82 14.262,00 1.314,61 (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20079 Tanggal 9 Juni 2021 145 Component 1 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301009105 9-Jun-2021 158.397.951,66 100% 158.397.951,66 14.222,00 11.137,53 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan pengambilan data monitoring kesehatan terumbu karang dan ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) Kota Sabang 146 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301009363 14-Jun-2021 270.129.965,82 100% 270.129.965,82 14.222,00 18.993,81 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka monitoring safeguard kegiatan Reef Health Monitoring (RHM) Coremap-CTI di Perairan Pulau Weh dan kegiatan RHM Ternate tanggal 13 s.d. 17 Juni 2021 147 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301009425 15-Jun-2021 61.092.023,20 100% 61.092.023,20 14.222,00 4.295,60 perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti kegiatan Riset Pengembangan Kapasitas COREMAP-CTI Tahun Anggaran 2021, di Kabupaten Paser Kalimantan Timur, tanggal 20 s.d. 26 Juni 2021 148 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301009240 11-Jun-2021 18.450.058,38 100% 18.450.058,38 14.222,00 1.297,29 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti survei kegiatan riset pengembangan kapasitas dengan judul Eksplorasi Mikroorganisme Perairan Teluk Jakarta 149 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303007859 11-Jun-2021 31/KW/CVGS/V/2021 CV. Gina Sejahtera 22.637.441,84 100% 22.637.441,84 14.222,00 1.591,72 berupa Pembayaran Pengadaan bahan pemeliharaan tanggal 31 Mei 2021 dan perlengkapan analisis untuk kegiatan penelitian makroalga sebagai pakan dan sumber antioksidan, sesuai dengan kwitansi nomor: 31/KW/CVGS/V/2021 150 Component 1 Pembayaran Belanja barang berupa pembayaran 088 Jakarta III LIPI 210881301009398 14-Jun-2021 240.393.043,80 100% 240.393.043,80 14.222,00 16.902,90 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan Pelatihan Penilaian Kondisi Terumbu Karang dan Uji Kompetensi (TUK) Sewaktu tanggal 13 s.d. 22 Juni 2021 di Universitas Bangka Belitung 151 Component 1 Pembayaran Belanja Barang Berupa Pembayaran 088 Jakarta III LIPI 210881301009725 16-Jun-2021 24.045.998,77 100% 24.045.998,77 14.257,00 1.686,61 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Menghadiri kegiatan monitoring dan evaluasi program restorasi terumbu karang 152 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja 088 Jakarta III LIPI 210881701008210 17-Jun-2021 117.634.556,83 100% 117.634.556,83 14.453,00 8.139,11 Barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20087 Tanggal 17 Juni 2021 153 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008269 18-Jun-2021 723.008.578,93 100% 723.008.578,93 14.453,00 50.024,81 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20092 Tanggal 18 Juni 2021 154 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008267 18-Jun-2021 29.991.709,36 100% 29.991.709,36 14.453,00 2.075,12 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20089 Tanggal 18 Juni 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 155 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008430 21-Jun-2021 8.161.898,16 100% 8.161.898,16 14.453,00 564,72 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20094 Tanggal 18 Juni 2021 156 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008211 17-Jun-2021 72.613.028,24 100% 72.613.028,24 14.453,00 5.024,08 barang (PHLN,COREMAP, 052) dari BPP3. Bandung, Sesuai SPP Nomor 20088 Tanggal 17 Juni 2021 157 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008433 21-Jun-2021 12.031.688,91 100% 12.031.688,91 14.453,00 832,47 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20095 Tanggal 18 Juni 2021 158 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008429 21-Jun-2021 7.512.235,81 100% 7.512.235,81 14.453,00 519,77 barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20093 Tanggal 18 Juni 2021 159 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008431 21-Jun-2021 84.826.391,36 100% 84.826.391,36 14.453,00 5.869,12 Barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20096 Tanggal 18 Juni 2021 160 Component 1 Pembayaran belanja barang berupa perjalanan dinas 088 Jakarta III LIPI 210881301009948 18-Jun-2021 250.191.980,69 100% 250.191.980,69 14.453,00 17.310,73 (PHLN,COREMAP,051) paket meeting Luar Kota kegiatan pelatihan asesor kompetensi 2021 tanggal 29 April s.d. 5 Mei 2021 di Nusa Dua Bali 161 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008432 18-Jun-2021 8.430.001,31 100% 8.430.001,31 14.453,00 583,27 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20097 Tanggal 18 Juni 2021 162 Component 2 Penggantian UP untuk keperluan Belanja barang 088 Jakarta III LIPI 210881301010248 22-Jun-2021 16.499.978,39 100% 16.499.978,39 14.453,00 1.141,63 (PHLN,COREMAP,052) dari BPP.1 Ambon, Sesuai SPP Nomor 20098 Tanggal 22 Juni 2021 163 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701008268 18-Jun-2021 103.432.749,97 100% 103.432.749,97 14.453,00 7.156,49 barang (PHLN,COREMAP 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20090 Tanggal 18 Juni 2021 164 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302008163 22-Jun-2021 105/AMP- PT Arsi Mandiri Putra 45.513.541,26 100% 45.513.541,26 14.421,00 3.156,06 berupa Pembayaran Biaya Pekerjaan Pengadaan Bahan LIPI/Faktur/VI/2021 Kegiatan Uji Kompetensi Skema Penilai Kondisi Terumbu tanggal 18 Juni 2021 Karang di TUK FPPB Universitas Bangka Belitung 165 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 140 Khusus Pinjaman Bappenas 211401105000893 24 June 2021 70.477.704,00 100% 70.477.704,00 14.454,00 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Fauzan dan Hibah Hidayat 166 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 140 Khusus Pinjaman Bappenas 211401105000892 24 June 2021 70.477.704,00 100% 70.477.704,00 14.454,00 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Kristina dan Hibah Setiani 167 Component 1 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301010417 24-Jun-2021 295.890.002,10 100% 295.890.002,10 14.454,00 20.471,15 perjalanan dinas (PHLN, COREMAP,051) dalam rangka kegiatan survey kesehatan terumbu karang (RHM) coremap-CTI ke Natuna Kepulauan Riau tanggal 28 Juni s.d. 9 Juli 2021 168 Component 1 Pemb. International Travel Program S3 Diklat Gelar Luar 140 Khusus Pinjaman Bappenas 211401302000208 23 June 2021 17.359.832,16 100% 17.359.832,16 14.454,00 1.201,04 Negeri Coremap-CTI Karyasiswa Diky Suganda a.n dan Hibah PT.Jendela Dunia Wisata 169 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S3 140 Khusus Pinjaman Bappenas 211401105000900 25 June 2021 51.867.648,00 100% 51.867.648,00 14.472,00 3.584,00 Periode Apr - Jun 2021 Diklat Gelar Luar Negeri Coremap- dan Hibah CTI a.n Diky Suganda 170 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 140 Khusus Pinjaman Bappenas 211401105000894 25 June 2021 70.565.472,00 100% 70.565.472,00 14.472,00 4.876,00 LN Pend dan Pel COREMAP-CTI a.n Joyke Fredy Bastian dan Hibah Rumajar 171 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Juli-Sept 140 Khusus Pinjaman Bappenas 211401105000902 28 June 2021 70.565.472,00 100% 70.565.472,00 14.472,00 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Samuel Radityo dan Hibah Adiprabowo 172 Component 1 Pemb Tunj Biaya Hidup periode Juli-Sep 2021 dll Prog S2 140 Khusus Pinjaman Bappenas 211401105000884 24 June 2021 70.565.472,00 100% 70.565.472,00 14.472,00 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n FNU dan Hibah Hariono 173 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 140 Khusus Pinjaman Bappenas 211401105000885 24 June 2021 70.565.472,00 100% 70.565.472,00 14.472,00 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Rizkie dan Hibah Satriya Utama 174 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Juli-Sept 140 Khusus Pinjaman Bappenas 211401105000903 28 June 2021 70.565.472,00 100% 70.565.472,00 14.472,00 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Fawzan Bhakti dan Hibah Soffa 175 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302008477 29-Jun-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 555.239.119,68 100% 555.239.119,68 14.472,00 38.366,44 berupa pembayaran termin VIII Pembangunan Gedung Tanggal 11/11/2019 Pusat Data Nasional Ekosistem Pesisir Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, sesuai SPK Nomor: 3913/IPK.2.03/LK/XI/2019 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 176 Component 2 Penggantian UP untuk keperluan Belanja barang 088 Jakarta III LIPI 210881301010486 25-Jun-2021 52.020.472,32 100% 52.020.472,32 14.472,00 3.594,56 (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20102 Tanggal 25 Juni 2021 177 Component 2 Penggantian UP Untuk Keperluan Belanja Barang 088 Jakarta III LIPI 210881301010765 01/07/2021 Bendahara Pengeluaran 18.645.000,00 100% 18.645.000,00 14.482 1.287,46 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20122 Tanggal 4 Agustus 2021 178 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701009421 02/07/2021 Bendahara Pengeluaran 65.607.544,00 100% 65.607.544,00 14.482 4.530,28 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20104 Tanggal 2 Juli 2021 179 Component 1 Pemb Tunj Biaya Hidup dll Program S2 LN Periode Juli- 140 Khusus Pinjaman Bappenas 211401105000908 30/06/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 Sept 2021 Diklat LN COREMAP-CTI a.n Restya Rahmaniar dan Hibah 180 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Juli-Sept 2021 140 Khusus Pinjaman Pendidikan dan Pelatihan LN COREMAP-CTI a.n Desak Bappenas 211401105000920 01/07/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 dan Hibah Made Pera Rosita Dewi 181 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Periode Jul - Sep 2021 Diklat Gelar Luar Negeri Coremap- Bappenas 211401105000934 02/07/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 dan Hibah CTI an Alan Ray Farandy 182 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Periode Jul - Sep 2021 Diklat Gelar Luar Negeri Coremap- Bappenas 211401105000909 30/06/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 dan Hibah CTI an Meydar H Saleh 183 Component 1 Pemb International travel Prog S2 LN Pendidikan dan 140 Khusus Pinjaman Pelatihan Coremap-CTI PT Jendela Dunia Wisata a.n Bappenas 211401105000907 30/06/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 dan Hibah Muhammad H Ghifari 184 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301011312 08/07/2021 Bendahara Pengeluaran 196.478.300,00 100% 196.478.300,00 14.548 13.505,52 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti kegiatan RHM COREMAP di Kota Kendari, Sulawesi Tenggara tanggal 8 s.d. 17 Juli 2021, 185 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301011484 09/07/2021 Bendahara Pengeluaran 7.690.109,00 100% 7.690.109,00 14.548 528,60 (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20106 Tanggal 9 Juli 202 186 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301011643 13/07/2021 Bendahara Pengeluaran 52.590.000,00 100% 52.590.000,00 14.486 3.630,40 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan Riset Pengembangan Kapasitas Coremap CTI dengan judul Evaluasi Tingkat Penyerapan dan Pelepasan Karbon dari Budidaya Makroalga 187 Component 2 Pertanggungjawaban TUP untuk Keperluan belanja 088 Jakarta III LIPI 210881701010185 15/07/2021 Bendahara Pengeluaran 117.519.180,00 100% 117.519.180,00 14.493 8.108,69 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20108 Tanggal 14 Juli 2021 188 Component 3 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301011985 19/07/2021 Bendahara Pengeluaran 14.521.200,00 100% 14.521.200,00 14.524 999,81 (PHLN,COREMAP,053) dari BPP.1 Ambon, Sesuai SPP Nomor 20110 Tanggal 16 Juli 2021 189 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja 088 Jakarta III LIPI 210881701010385 19/07/2021 Bendahara Pengeluaran 47.152.600,00 100% 47.152.600,00 14.524 3.246,53 Barang (PHLN,COREMAP, 052) dari BPP.3 Bandung, Sesuai SPP Nomor 20109 Tanggal 16 Juli 2021 190 Component 1 Pembayaran Belanja Barang Berupa Pembayaran 088 Jakarta III LIPI 210881301012213 22/07/2021 Bendahara Pengeluaran 164.370.000,00 100% 164.370.000,00 14.554 11.293,80 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka pengambilan data monitoring kesehatan terumbu karang ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) 191 Component 1 Pertanganggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701010847 27/07/2021 Bendahara Pengeluaran 31.000.000,00 100% 31.000.000,00 14.494 2.138,82 Modal (PHLN,COREMAP, 051) dari BPP.2 Cibinong, Sesuai SPP Nomor 10018 Tanggal 26 Juli 2021 192 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701010848 27/07/2021 Bendahara Pengeluaran 89.667.990,00 100% 89.667.990,00 14.494 6.186,57 barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20112 Tanggal 26 Juli 2021 193 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302009782 23/07/2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 3.654.194.600,00 100% 3.654.194.600,00 14.494 252.117,75 Berupa Pembayaran termin IX (Retensi) Pekerjaan Tanggal 11/11/2019 Pembangunan Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan RUang Kerja Pusat Penelitian Oseanografi LIPI 194 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701011067 29/07/2021 Bendahara Pengeluaran 32.836.434,00 100% 32.836.434,00 14.498 2.264,89 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung, Sesuai SPP Nomor 20117 Tanggal 28 Juli 2021 195 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701010935 28/07/2021 Bendahara Pengeluaran 32.499.600,00 100% 32.499.600,00 14.498 2.241,66 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20115 Tanggal 27 Juli 2021 196 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701010930 28/07/2021 Bendahara Pengeluaran 929.388.920,00 100% 929.388.920,00 14.498 64.104,63 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20114 Tanggal 27 Juli 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 197 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701010929 28/07/2021 Bendahara Pengeluaran 222.719.580,00 100% 222.719.580,00 14.498 15.362,08 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20113 Tanggal 26 Juli 2021 198 Component 3 pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701010931 28/07/2021 Bendahara Pengeluaran 34.791.402,00 100% 34.791.402,00 14.498 2.399,74 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20116 Tanggal 27 Juli 2021 199 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701011068 29/07/2021 Bendahara Pengeluaran 71.643.655,00 100% 71.643.655,00 14.498 4.941,62 barang (PHLN,COREMAP, 052) dari BPP.5 P2O jakarta, Sesuai SPP Nomor 20118 Tanggal 28 Juli 2021 200 Component 2 Penggantian UP Untuk Keperluan Belanja Barang 088 Jakarta III LIPI 210881301013166 05/08/2021 Bendahara Pengeluaran 13.515.600,00 100% 13.515.600,00 14.342 942,38 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20122 Tanggal 4 Agustus 2021 201 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303010910 05/08/2021 Kuitansi Nomor: 063/KW- PT FIRST MEDIA NEWS 49.900.000,00 100% 49.900.000,00 14.342 3.479,29 berupa Pembayaran Pengadaan Jasa Media Campaign KL/VII/2021 tanggal 30 Juli Talk Show Untuk Kegiatan Diseminasi Coremap CTI, 2021 sesuai Kuitansi Nomor: 063/KW-KL/VII/2021 tanggal 30 Juli 2021 202 Component 1 Pemb International travel Prog S2 LN Pendidikan dan 211401302000284 1.631,97 140 Khusus Pinjaman Pelatihan Coremap-CTI PT Jendela Dunia Wisata a.n Bappenas 04/08/2021 23.405.713,74 100% 23.405.713,74 14.342 dan Hibah Muhammad H Ghifari 203 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301012705 30/07/2021 Bendahara Pengeluaran 38.145.000,00 100% 38.145.000,00 14.342 2.659,67 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan riset di bawah Reef Health Monitoring COREMAP CTI Eksperimen Restorasi Lamun di Pulau Pari Kepualauan Seribu 204 Component 2 Pembayaran Belanja Barang 088 Jakarta III LIPI 210881303010924 05/08/2021 0921/PPK/IV/PK/KU/4/2 CV. SUBUR KARYA 116.321.000,00 100% 116.321.000,00 14.342 8.110,51 (PHLN,COREMAP,052)berupa Pembayaran Pengadaan 021 tanggal 29 April 2021 Bahan Penelitian Pemetaan Distribusi dan Kelimpahan sidat (Anguilla spp.) dengan teknologi eDNA sebagai dasar konservasi sidat di kawasan segara anakan Cilacap 205 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302010248 02/08/2021 2690/IPK.2.03/LK/VI/2018 PT.JAKARTA KONSULTINDO 242.790.000,00 100% 242.790.000,00 14.342 16.928,60 berupa Pembayaran tahap IV Pekerjaan Pengadaan jasa tanggal 25 Juni 2018 konsultansi perencanaan DED dan UKL-UPL Pemba ngunan gedung pusat data nasional ekosistem pesisir, laboratorium dan ruang kerja P2O LIPI 206 Component 1 Pembayaran belanja barang berupa pembayaran 088 Jakarta III LIPI 210881301014173 18/08/2021 Bendahara Pengeluaran 105.875.000,00 100% 105.875.000,00 14.383 7.361,12 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti survei kegiatan riset dan pengembangan monitoring kesehatan terumbu karang dan ekosistem terkait COREMAP CTI tahun kegiatan 2021-2022 207 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301014040 18/08/2021 Bendahara Pengeluaran 123.420.000,00 100% 123.420.000,00 14.383 8.580,96 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan menindak lanjuti proses proses pembentukan BLUD ICRG PES di Bali 208 Component 2 Penggantian UP Untuk Keperluan Belanja Barang 088 Jakarta III LIPI 210881301013982 16/08/2021 Bendahara Pengeluaran 15.796.007,00 100% 15.796.007,00 14.383 1.098,24 (PHLN,COREMAP,052) dari BPP.1 Ambon, Sesuai SPP Nomor 20124 Tanggal 13 Agustus 2021 209 Component 2 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301014282 19/08/2021 Bendahara Pengeluaran 23.400.000,00 100% 23.400.000,00 14.415 1.623,31 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan riset pengembangan kapasi tas COREMAP CTI dengan Judul Karakterisasi Sedimen Organik Perairan Rentan Hypoxia di Teluk Semarang 210 Component 1 embayaran Belanja Modal (PHLN,COREMAP,051) berupa 088 Jakarta III LIPI 210881303012168 23/08/2021 1585/PPK/IV/PK/KU/5/202 PT. DATASCRIP 81.568.181,00 100% 81.568.181,00 14.415 5.658,56 Pembayaran Pengadaan Belanja Modal Peralatan dan 1 tanggal 21 Juni 2021 Mesin Berupa Meubelair Perkantoran BBIL (Paket 3) Pembiayaan Coremap CTI sesuai Surat Pesanan Nomor: 1585/PPK/IV/PK/KU/5/2021 tanggal 21 Juni 2021 211 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301014665 25/08/2021 Bendahara Pengeluaran 63.213.000,00 100% 63.213.000,00 14.408 4.387,35 Perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan verifikasi Tempat Uji Kompetensi (TUK) ke Universitas Pattimura Ambon tanggal 24 s.d. 29 Agustus 2021 212 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301014625 25/08/2021 Bendahara Pengeluaran 54.900.000,00 100% 54.900.000,00 14.408 3.810,38 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka mengikuti kegiatan Study Banding Pengembangan Model AI Untuk Analisa Data Foto Terumbu Karang di Universitas Udayana dan LINI, Bali Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 213 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,LIPI) 088 Jakarta III LIPI 210881303012407 25/08/2021 Nomor: SEJAHTERA BALI FURINDO 46.233.727,00 100% 46.233.727,00 14.408 3.208,89 berupa E-Purchasing Pengadaan Belanja Modal 1621/PPK/IV/PK/KU/5/202 PT Peralatan dan Mesin Berupa Meubelair Perkantoran 1 tanggal 24 Mei 2021 BBIL, sesuai Surat Pesanan Nomor: 1621/PPK/IV/PK/KU/5/2021 tanggal 24 Mei 2021 214 Component 1 Pembayaran Belanja Barang Berupa Pembayaran 088 Jakarta III LIPI 210881301014701 26/08/2021 Bendahara Pengeluaran 23.400.000,00 100% 23.400.000,00 14.408 1.624,10 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti Survei kegiatan riset dan pengemba ngan monitoring kesehatan terumbu karang dan ekosistem terkait tahun kegiatan 2021-2022 215 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja 088 Jakarta III LIPI 210881701012796 26/08/2021 Bendahara Pengeluaran 36.402.000,00 100% 36.402.000,00 14.408 2.526,51 Barang (PHLN,COREMAP, 052) dari BPP.4 Mataram, Sesuai SPP Nomor 20132 Tanggal 25 Agustus 2021 216 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701012795 26/08/2021 Bendahara Pengeluaran 13.200.000,00 100% 13.200.000,00 14.408 916,16 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram, Sesuai SPP Nomor 20131 Tanggal 25 Agustus 2021 217 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701013075 30/08/2021 Bendahara Pengeluaran 297.904.055,00 100% 297.904.055,00 14.374 20.725,20 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20136 Tanggal 30 Agustus 2021 218 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701013076 30/08/2021 Bendahara Pengeluaran 195.381.300,00 100% 195.381.300,00 14.374 13.592,69 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20137 Tanggal 30 Agustus 2021 219 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301014874 27/08/2021 Bendahara Pengeluaran 241.047.000,00 100% 241.047.000,00 14.374 16.769,65 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan pelatihan Recognition Current Competency (RCC) di Semarang tanggal 29 Agustus s.d. 5 September 2021 220 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701013074 30/08/2021 Bendahara Pengeluaran 45.658.364,00 100% 45.658.364,00 14.374 3.176,45 barang (PHLN,COREMAP. 052) dari BP Pusat Jakarta, 221 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301015049 31/08/2021 Bendahara Pengeluaran 12.020.000,00 100% 12.020.000,00 14.374 836,23 (PHLN,COREMAP,052), dari BPP.4 Mataram 222 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303012553 30/08/2021 2026/PPK/IV/PK/KU/8/202 CV. FAJAR LAKSANA 90.750.000,00 100% 90.750.000,00 14.374 6.313,48 berupa Pembayaran Pengadaan Belanja Modal Peralatan 1 tanggal 2 Agustus 2021 Pendukung Laboratorium Balai Bio Industri Laut (BBIL) 223 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701013253 31/08/2021 Bendahara Pengeluaran 35.380.300,00 100% 35.380.300,00 14.374 2.461,41 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, 224 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303012997 02/09/2021 0742/PPK/IV/PK/KU/5/202 PT.Dekoruma Niaga 83.002.500,00 100% 83.002.500,00 14.284 5.810,87 Berupa Permbayaran Jasa Konsultansi Pekerjaan 1 tanggal 17 Mei 2021 Sejahtera Perencana Interior Desain Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI 225 Component 2 Pembayaran Belanja Barang Berupa Pembayaran 088 Jakarta III LIPI 210881301015554 06/09/2021 Bendahara Pengeluaran 45.500.000,00 100% 45.500.000,00 14.261 3.190,52 perjalanan dinas (PHLN, COREMAP,052) dalam rangka kegiatan penelitian Ketahan Wilayah Pesisir Jawa Utara terhadap Ambiens Tanah di Kota Pekalongan, tanggal 14- 25 September 2021 226 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302012290 06/09/2021 1909/PPK/IV/PK/KU/7/202 CV.AKBAR ABADI JAYA 40.000.000,00 100% 40.000.000,00 14.261 2.804,85 berupa Pengadaan Pekerjaan Pintu Pagar Gedung BBIL 1 tanggal 16 Juli 2021 LIPI Mataram, sesuai Surat Pesanan Nomor: 1909/PPK/IV/PK/KU/7/2021 tanggal 16 Juli 2021 227 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301015404 03/09/2021 Bendahara Pengeluaran 20.879.800,00 100% 20.879.800,00 14.261 1.464,12 (PHLN,COREMAP,052) dari BPP.1 Ambon 228 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301015704 08/09/2021 Bendahara Pengeluaran 187.428.000,00 100% 187.428.000,00 14.272 13.132,57 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Melakukan kegiatan penelitian Kondisi Ekosistem Terumbu Karang dan Ekosistem terkait di Perairan Maumere, Kabupatenm Sikka 229 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701013974 10/09/2021 Bendahara Pengeluaran 222.358.754,00 100% 222.358.754,00 14.272 15.580,07 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 230 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301015705 08/09/2021 Bendahara Pengeluaran 55.140.000,00 100% 55.140.000,00 14.272 3.863,51 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Melakukan penelitian lapangan ke Kabupaten Cirebon tanggal 14 s.d. 26 September 2021 231 Component 2 Pembayaran Belanja barang berupa pembayaran 088 Jakarta III LIPI 210881301015866 10/09/2021 Bendahara Pengeluaran 109.185.000,00 100% 109.185.000,00 14.272 7.650,29 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Mengikuti Prasurvei dan Survei kegiatan Riset Unggulan COREMAP CTI di Kota Manado, Provinsi Sulawesi Utara, tanggal 13 s.d.23 September 2021 232 Component 1 Pemb Tunjangan Biaya Hidup Program S2 LN Periode Juli 210,71 140 Khusus Pinjaman 2021 Diklat Gelar LN COREMAP-CTI a.n Muhammad Bappenas 211401304000198 09/09/2021 3.007.234,00 100% 3.007.234,00 14.272 dan Hibah Hafizh Ghifari Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 233 Component 3 \Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301015594 07/09/2021 Bendahara Pengeluaran 77.190.000,00 100% 77.190.000,00 14.272 5.408,49 Perjalanan Dinas (PHLN, COREMAP,053) dalam rangka pelaksanaan FGD dan Indepth Interview Pelaku Kunci Coremap CTI di Gedung Kusnoto, Bogor Jawa Barat 234 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701013973 10/09/2021 Bendahara Pengeluaran 54.466.471,00 100% 54.466.471,00 14.272 3.816,32 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta 235 Component 1 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301015571 07/09/2021 Bendahara Pengeluaran 82.514.000,00 100% 82.514.000,00 14.272 5.781,53 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan Pemantauan Kegiatan Monitoring Kesehatan Terumbu Karang dan Ekosistem Terkait (COREMAP CTI) di Kabupaten Sikka, NTT 236 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301015756 08/09/2021 Bendahara Pengeluaran 40.392.000,00 100% 40.392.000,00 14.272 2.830,16 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan Riset Pengembangan Kapasi tas COREMAP CTI di Teluk Wediombo Gunung Kidul, Provinsi DI Yogyakarta 237 Component 2 enggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301015669 08/09/2021 Bendahara Pengeluaran 10.430.000,00 100% 10.430.000,00 14.272 730,80 (PHLN,COREMAP,052) dari BPP.4 Mataram, 238 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301017045 24-Sep-2021 Bendahara Pengeluaran 8.535.226,00 100% 8.535.226,00 14.155 602,98 (PHLN,COREMAP, 052) dari BPP.4 Mataram 239 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302013618 29-Sep-2021 No 30/CV-SJM/K/IX/2021 CV. SABET JAYA MANDIRI 47.951.000,00 100% 47.951.000,00 14.155 3.387,57 berupa Pembayaran Pengadaan Bahan pelatihan CTI tanggal 24 September Pemantauan Komunitas Mangrove dan Lamun TUK 2021 240 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303014007 15-Sep-2021 1731/PPK/IV/PK/KU/6/202 PT HOME CENTER 466.226.000,00 100% 466.226.000,00 14.155 32.937,20 berupa pembayaran Pengadaan Belanja Modal Peralatan 1 tanggal 29 Juni 2021 INDONESIA 241 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301016138 14-Sep-2021 Bendahara Pengeluaran 51.510.000,00 100% 51.510.000,00 14.155 3.639,00 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka 242 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701015360 29-Sep-2021 Bendahara Pengeluaran 536.061.550,00 100% 536.061.550,00 14.155 37.870,83 barang (PHLN, COREMAP, 051) dari BP Pusat Jakarta 243 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881303015225 4-Oct-21 2447/PPK/IV/PK/KU/9/202 PT Karya Mentari Seraya 2.512.429.500 100% 2.512.429.500 14.096 178.237,05 berupa pembayaran Uang muka pengadaan belanja 1 tanggal 3 September 244 Component 2 Pembayaran Belanja Barang Berupa Pembayaran 088 Jakarta III LIPI 210881301016830 22-Sep-2021 Bendahara Pengeluaran 466.007.130,00 100% 466.007.130,00 14.096 33.059,53 perjalanan dinas (PHLN, COREMAP,052) dalam rangka mengikuti kegiatan RHM COREMAP di Kalimantan Timur 245 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301016818 21-Sep-2021 Bendahara Pengeluaran 448.196.000,00 100% 448.196.000,00 14.096 31.795,97 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka 246 Component 1 Pembayaran Belanja Barang berupa pembayaran 210881301018110 7-Oct-21 Bendahara Pengeluaran 284.697.000,00 100% 284.697.000,00 14.096 20.197,01 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan sertifikasi kompetensi skema penilai kondisi padang lamun dan komunitas mangrove 247 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 210881301019527 22-Oct-2021 Bendahara Pengeluaran 108.339.000,00 100% 108.339.000,00 14.165 7.648,36 berupa perjalanan dinas dalam rangka Melaksanakan kegiatan sertifikasi kompetensi skema Penilaian 248 Component 2 Penggantian UP untuk keperluan belanja barang 210881301019497 22-Oct-2021 Bendahara Pengeluaran 6.375.000,00 100% 6.375.000,00 14.165 450,050 (PHLN,COREMAP,052) dari BPP.4 Mataram, 249 Component 2 Penggantian UP untuk keperluan belanja Barang 210881301018075 7-Oct-2021 Bendahara Pengeluaran 48.122.000,00 100% 48.122.000,00 14.165 3.397,250 (PHLN,COREMAP,052) dari BPP.2 Cibinong 250 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302013609 29-Sep-2021 K038PB092021, tanggal 9 CV. PASUNDAN BIOTECH 31.693.000,00 100% 31.693.000,00 14.165 2.237,420 berupa Pembayaran Pengadaan bahan kimia (indent) September 2021 251 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301016784 21-Sep-2021 Bendahara Pengeluaran 6.445.800,00 100% 6.445.800,00 14.165 455,05 (PHLN,COREMAP,052) dari BP Pusat Jakarta 252 Component 3 Penggantian UP untuk keperluan belaja barang 088 Jakarta III LIPI 210881301016785 21-Sep-2021 Bendahara Pengeluaran 34.130.800,00 100% 34.130.800,00 14.165 2.409,52 (PHLN,COREMAP,053) dari BP Pusat jakarta 253 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301016763 21-Sep-2021 Bendahara Pengeluaran 24.372.000,00 100% 24.372.000,00 14.165 1.720,58 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka 254 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881303016807 19-Oct-2021 0079/GTP/X/2021 tanggal CV Graha Tri Putra 49.500.000,00 100% 49.500.000,00 14.165,00 3.494,53 berupa Pengadaan Jasa Pembuatan Aplikasi MonMang 4 Oktober 2021 255 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881301019130 18-Oct-2021 Bendahara Pengeluaran 152.426.000,00 100% 152.426.000,00 14.165 10.760,75 berupa Perjalanan Dinas dalam rangka mengikuti kegiatan RHM COREMAP di Lombok Barat, NTB 256 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881301017076 24-Sep-2021 88.KW/FHK/IX/2021 CV FAJRI HUTAMA KARYA 25.060.500,00 100% 25.060.500,00 14.165 1.769,18 berupa Pembayaran Pengadaan Bahan Penelitian RHM Tanggal 22 September Sumba Timur (Koordinator Tri Aryono) sesuai kwitansi 2021 257 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302013417 24-Sep-2021 47/K/AJM/IX/2021 tanggal CV. ALSABIL JAYA MANDIRI 15.112.000,00 100% 15.112.000,00 14.165 1.066,85 berupa pembayaran Pengadaan Bahan Penelitian RHM 17 September 2021 Tual Maluku Utara (Koordinator Teddy Triandiza) sesuai Kwitansi Nomor 47/K/AJM/IX/2021 tanggal 17 258 Component 2 Pembayaran belanja barang berupa pembayaran 088 Jakarta III LIPI 210881301018239 8-Oct-2021 Bendahara Pengeluaran 29.700.000,00 100% 29.700.000,00 14.165 2.096,72 perjalanan dinas (PHLN, COREMAP,052) dalam rangka melakukan penelitian dan pengujian sampel di Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 259 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303016311 13-Oct-2021 2569/PPK/IV/PK/KU/9/202 PT Airmas Mataram 68.767.273,00 100% 68.767.273,00 14.165 4.854,73 berupa pembayaran e purchasing pengadaan belanja 1 tanggal 3 September Internusa modal perlatan mesih berupa papan tulis digital sesuai 2021 dengan SPK No: 2569/PPK/IV/PK/KU/9/2021 tanggal 3 260 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301017300 28-Sep-2021 Bendahara Pengeluaran 89.190.000,00 100% 89.190.000,00 14.165 6.296,51 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka survey dinamika Sedimentasi Muara Batanghari dan Dampaknya Terhadap Ekosistem Pesisir di Jambi (Iwan.R) 261 Component 1 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301016766 21-Sep-2021 Bendahara Pengeluaran 32.573.000,00 100% 32.573.000,00 14.165 2.299,54 (PHLN,COREMAP,051) dari BP Pusat Jakarta 262 Component 3 Pembayaran Belanja barang berupa pembayaran 088 Jakarta III LIPI 210881301016765 21-Sep-2021 Bendahara Pengeluaran 124.260.000,00 100% 124.260.000,00 14.165 8.772,33 perjalanan dinas (PHLN, COREMAP,053) dalam rangka monitoring safeguard RHM Coremap CTI di Mataram, NTB (Irfan Kampono) dan di Kab. Sikka, NTT (Deni 263 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881302015386 25-Oct-2021 2364/PPK/IV/PK/KU/8/20 PT. Interkineksi Izzi 76.075.000,00 76.075.000,00 14.165 5.370,63 berupa Pembayaran Jasa Konsultansi Pekerjaan Konsultan 264 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,015) 210881303017252 25-Oct-2021 2571/PPK/IV/PK/KU/9/202 PT. Bhinneka Mentari 15.454.545,00 15.454.545,00 14.165 1.091,04 berupa E-Purchasing Pengadaan Belanja Modal 1 Tanggal 8 September Dimensi 265 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303014806 28-Sep-2021 2227/PPK/IV/PK/KU/8/202 PT. COMFINDO MITRA 48.430.000,00 100% 48.430.000,00 14.165 3.418,99 berupa Pengadaan Spare Parts Laminar Air Flow untuk 1 tanggal 26 Agustus 2021 PRIMA 266 Component 1 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301017228 28-Sep-2021 Bendahara Pengeluaran 276.212.000,00 100% 276.212.000,00 14.165 19.499,61 perjalanan dinas (PHLN, COREMAP,051) dalam rangka melakukan survey kegiatan RHM COREMAP CTI di Kabupaten Sumba Timur NTT, tanggal 30 September s.d. 267 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302013528 28-Sep-2021 143-SBA/KW/IX/2021 PT. SARANA BUJANA ARTA 34.500.000,00 100% 34.500.000,00 14.165,00 2.435,58 berupa Pembayaran Jasa Pemindahan genset dari P2O tanggal 7 September 2021 268 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701015798 4-Oct-2021 Bendahara Pengeluaran 76.602.833,00 76.602.833,00 14.165,00 5.407,90 barang (PHLN,COREMAP, 052,053) dari BPP.1 Ambon 269 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301018367 11-Oct-2021 Bendahara Pengeluaran 19.385.169,00 19.385.169,00 14.165,00 1.368,53 (PHLN,COREMAP,052) Cofunding, dari BPP.4 Mataram, 270 Component 2 Pembayaran belanja barang berupa pembayaran 088 Jakarta III LIPI 210881301018125 7-Oct-2021 Bendahara Pengeluaran 94.824.000,00 94.824.000,00 14.165,00 6.694,25 perjalanan dinas (PHLN, COREMAP,052) dalam rangka 271 Melaksanakan Component 2 Pembayaran kegiatan Belanja Pelatihan Barang Pemantau Ekosistem (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303017314 26-Oct-2021 2054/PPK/IV/PK/KU/8/202 CV. Aneka Sarana 96.617.000,00 100% 96.617.000,00 14.165,00 6.820,83 berupa Pengadaan Bahan Kegiatan Pencemaran 1 tanggal 12 Agustus 2021 Mikroplastik Perairan Danau Urban Jakarta dan 272 Component 2 Sekitarnya Pembayaran yang bermuara Belanja BarangdiBerupa teluk Jakarta Koordinator pembayaran 088 Jakarta III LIPI 210881301017339 29-Sep-2021 Bendahara Pengeluaran 23.375.000,00 100% 23.375.000,00 14.165,00 1.650,19 perjalanan dinas (PHLN, COREMAP,052) dalam rangka 273 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301017070 24-Sep-2021 Bendahara Pengeluaran 16.250.000,00 100% 16.250.000,00 14.165,00 1.147,19 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan Monitoring Kegiatan ICRG COREMAP 274 Component 3 Penggantian UP untu keperluan belanja barang 088 Jakarta III LIPI 210881301017044 24-Sep-2021 Bendahara Pengeluaran 8.750.644,00 100% 8.750.644,00 14.165,00 617,77 (PHLN,COREMAP,053) dari B BPP.4 Mataram 275 Component 1 Pembayaran Belanja Modal (PHLN,COREMPA,051) 088 Jakarta III LIPI 210881303015467 5-Oct-2021 2565/PPK/IV/PK/KU/9/202 PT Airmas Mataram 74.597.273,00 100% 74.597.273,00 14.165 5.266,31 berupa pembayaran E-Purchasing Pengadaan Belanja 1 tanggal 03 september Internusa 276 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303015468 5-Oct-2021 028/KW/IX/21 tanggal 28 CV General Labora 14.761.100,00 100% 14.761.100,00 14.165 1.042,08 berupa Pembayaran Pengadaan Bahan Kimia (Indent) September 2021 kegiatan Potensi Alginat dari Mikroalga Laut sebagai Bahan Baku Nanoenkapsulan (Cofunding MALSAI) sesuai 277 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co 088 Jakarta III LIPI 210881303013972 15-Sep-2021 195/KW-MHM/IX/2021 CV.MARGANA HITA 28.040.000,00 100% 28.040.000,00 14.165 1.979,53 funding berupa Pembayaran Pengadaaan bahan Kimia tanggal 9 September 2021 MANDIRI Kegiatan Teknologi Fotobioreaktor untuk Mikroalga 278 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301018669 13-Oct-2021 Bendahara Pengeluaran 187.041.000,00 100% 187.041.000,00 14.165 13.204,45 berupa Perjalanan Dinas dalam rangka Melaksanakan kegiatan lapangan Studi Perubahan Spasial dan Temporal Tutupan Mangrove di Laguna Segara Anakan, Cilacap, Jawa Tengah 279 Component 2 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301018625 13-Oct-2021 Bendahara Pengeluaran 10.670.000,00 100% 10.670.000,00 14.165 753,27 Perjalanan Dinas(PHLN, COREMAP,052) dalam rangka melakukan analisis sampel hasil penelitian di BATAN Jakarta tanggal 18 s.d. 19 Oktober 2021, 280 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301016137 14-Sep-2021 Bendahara Pengeluaran 45.372.000,00 100% 45.372.000,00 14.165 3.203,11 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan Studi Budidaya dan Pengem bangan Teknik Reproduksi Aseksual Pada Karang Hias tanggal 13 s.d. 17 September 2021 di Banyuwangi 281 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co 088 Jakarta III LIPI 210881303014098 16-Sep-2021 112/CKP/K/IX/2021 tanggal CV. CIPTA KARYA PERDANA 43.431.000,00 100% 43.431.000,00 14.165 3.066,08 Funding, berupa Pembayaran Pengadaaan bahan Kimia 10 September 2021 Kegiatan Teknologi Fotobioreaktor untuk Mikroalga 282 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701015361 29-Sep-2021 Bendahara Pengeluaran 40.090.000,00 100% 40.090.000,00 14.165 2.830,22 barang (PHLN,COREMAP. 052) dari BP Pusat Jakarta 283 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701015597 30-Sep-2021 Bendahara Pengeluaran 1.164.615,00 100% 1.164.615,00 14.165 82,22 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta, Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 284 Component 2 Pertanggungjawaban TUP untuk Keprluan Belanja 088 Jakarta III LIPI 210881701015316 29-Sep-2021 Bendahara Pengeluaran 100.220.857,00 100% 100.220.857,00 14.165 7.075,25 Barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, 285 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301017340 29-Sep-2021 Bendahara Pengeluaran 229.282.000,00 100% 229.282.000,00 14.165 16.186,52 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka melaksananan kegiatan RHM COREMAP CTI di 286 Component 1 Pembayaran Belanja Modal (PHN,COREMAP,051) berupa 088 Jakarta III LIPI 210881302014054 5-Oct-2021 2481/PPK/IV/PK/KU/9/202 PT Elo Karsa Utama 20.412.727,00 100% 20.412.727,00 14.165 1.441,07 pembayaran e-Purchasing Belanja Modal Perlatan dan 1 tanggal 6 September Mesin berupa Micropippet Multichannel 2021 287 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302013574 28-Sep-2021 2681/PPK/IV/PK/KU/IX/9/2 PT KEMIKO SAVITRI 82.410.000,00 100% 82.410.000,00 14.165 5.817,86 berupa pembayaran Pengadaan Paket Meeting dalam 021 tanggal 13 September SEJAHTERA rangka WOrkshop Revisi Program dan Perencanaan 2021 kegiatan Coremap CTI Tahun 2021 288 Component 3 Pembayaran Belanja Barang (PHLN,COREMAP,053) 088 Jakarta III LIPI 210881301019525 22-Oct-2021 Bendahara Pengeluaran 24.888.000,00 100% 24.888.000,00 14.165 1.757,01 berupa Perjalanan Dinas dalam rangka Pemeriksaan Fisik dan Serah Terima Pekerjaan Pengadaan Belanja Modal Peralatan dan Mesin Berupa Furniture Laboratorium BBIL Mataram di Lombok, NTB 289 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co 088 Jakarta III LIPI 210881303013976 15-Sep-2021 025/INV/PT.MED/09/2021 PT MEDRAY 47.541.000,00 100% 47.541.000,00 14.165 3.356,23 Funding, berupa Pembayaran Pengadaan Glass Wares tanggal 07 September dan Perlengkapan Laboratorium dalam rangka kegiatan 2021 pengembangan desain fotobioreaktor untuk produksi biomassa mikroalga anthospira (Spirulina) 290 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302013047 17-Sep-2021 2374/PPK/IV/IPK/KU/8/202 PT. Sunindo Indah Hotel 91.120.000,00 100% 91.120.000,00 14.165 6.432,76 berupa Pengadaan Paket Meeting Dalam Rangka 1 tanggal 30 Agustus 2021 Corp kegiatan pelatihan Recognition of current competency Lembaga Sertifikasi Profesi, Pusat Penelitian Oseanografi 291 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301018628 13-Oct-2021 Bendahara Pengeluaran 51.676.000,00 100% 51.676.000,00 14.165 3.648,15 berupa Perjalanan dinas dalam rangka Mengikuti Kegiatan Asesmen Simpul Data Pemantauan Ekosist em Pesisir di Pekanbaru (Bayu P), dan Pengambilan data lapangan untuk Penelitian Model transportasi 292 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301018626 13-Oct-2021 Bendahara Pengeluaran 22.842.700,00 100% 22.842.700,00 14.165 1.612,62 (PHLN,COREMAP,052) dari BPP.1 Ambon 293 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301016764 21-Sep-2021 Bendahara Pengeluaran 32.148.000,00 100% 32.148.000,00 14.165 2.269,54 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Survei Lapangan ke Kawasan Segara Anakan Cilacap (Sekar Larashati) dan Survei dan Pengukuran Lapangan Kuantitas Kualitas Perairan di DAS di Konawe 294 Component 1 Pembayaran Belanja modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303015594 6-Oct-2021 2668/PPK/IV/PK/KU/9/202 PT Mitra Mantari 51.971.055,00 100% 51.971.055,00 14.165 3.668,98 berupa E purchasing pengadaan belanja modal peralatan 1 tanggal 13 September mesin berupa instrument cabinet BBIL Mataram sesuai 2021 SPK Nomor 2668/PPK/IV/PK/KU/9/2021 tanggal 13 September 2021 295 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701015596 30-Sep-2021 Bendahara Pengeluaran 50.141.911,00 100% 50.141.911,00 14.165 3.539,85 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 296 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701015539 30-Sep-2021 Bendahara Pengeluaran 99.855.000,00 100% 99.855.000,00 14.165 7.049,42 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 297 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701015362 29-Sep-2021 Bendahara Pengeluaran 47.805.600,00 100% 47.805.600,00 14.165 3.374,91 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 298 Component 3 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301017378 29-Sep-2021 Bendahara Pengeluaran 158.560.000,00 100% 158.560.000,00 14.165 11.193,79 Perjalanan Dinas (PHLN, COREMAP,053) dalam rangka monitoring keamanan lingkungan dan social safeguard kegiatan reef Health Index and Related Ecosystem COREMAP CTI tanggal 3 s.d. 8 Oktober 2021 299 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301019131 18-Oct-2021 Bendahara Pengeluaran 228.638.000,00 100% 228.638.000,00 14.165 16.141,05 berupa perjalanan dinas dalam rangka Pengambilan Sampel air,sedimen dan ikan di Teluk banten (Sugiarti), dan survei lapangan di kab. Garut-JABAR (Asep sandra) dan di Kab. Banggai-SULTENG 300 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701015315 29-Sep-2021 Bendahara Pengeluaran 77.007.127,00 100% 77.007.127,00 14.165 5.436,44 Barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong 301 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302014936 18-Oct-2021 2887/PPK/IV/PK/KU/9/202 CV Inovasi Multi Kreasi 101.175.000,00 100% 101.175.000,00 14.165 7.142,61 berupa Pengadaan Bahan Pelatihan CTI Pemantauan 1 tanggal 29 September Ikan Karang, Terumbu Karang dan Megabenthos TUK 2021 UBH sesuai SPK No: 2887/PPK/IV/PK/KU/9/2021 tanggal 29 September 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 302 Component 2 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301017071 24-Sep-2021 Bendahara Pengeluaran 193.853.000,00 100% 193.853.000,00 14.165 13.685,35 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Validasi dan Indepth Interview Palaku Kunci COREMAP CTI (Aan Johan), Survei dan Pengukuran Lapangan Kuantitas dan dan Kualitas Perairan di DAS 303 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302013418 24-Sep-2021 61/KPF/K/IX/2021 tanggal CV. KING PREMIER FAMILY 18.968.000,00 100% 18.968.000,00 14.165 1.339,08 berupa Pengadaan Bahan Workshop sinkronisasi dan 22 September 2021 Pemutakhiran data pemantauan terumbu karang dan ekosistem terkait lainnya 304 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701014369 15-Sep-2021 Bendahara Pengeluaran 11.947.700,00 100% 11.947.700,00 14.165 843,47 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 305 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301016491 17-Sep-2021 Bendahara Pengeluaran 27.007.250,00 100% 27.007.250,00 14.165 1.906,62 (PHLN,COREMAP,052) dari BPP.3 Bandung, 306 Component 1 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301018323 11-Oct-2021 Bendahara Pengeluaran 676.000,00 100% 676.000,00 14.165 47,72 (PHLN,COREMAP, 051) dari BPP.4 Mataram 307 Component 1 Pembayaran Belanja modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302014819 14-Oct-2021 2601/PPK/IV/PK/KU/9/202 PT Elo Karsa Utama 98.181.818,00 100% 98.181.818,00 14.165 6.931,30 berupa E Purchasing Pengadaan belanja modal Peralatan 1 tanggal 10 September dan Mesin Berupa Biosafety cabinet, sesuai dengan 2021 Surat Pesanan Nomor 2601/PPK/IV/PK/KU/9/2021 tanggal 10 September 2021 308 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301018089 7-Oct-2021 Bendahara Pengeluaran 19.062.221,00 100% 19.062.221,00 14.165 1.345,73 (PHLN,COREMAP,052) COfunding, dari BPP.4 Mataram 309 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302015447 26-Oct-2021 75/KPF/K/10/2021 tanggal CV. King Premier Family 46.953.000,00 100% 46.953.000,00 14.165 3.314,72 berupa pengadaan bahan training internasional 22 Oktober 2021, Mangrove Monitoring RTRC MarBEST 2021 Koordinator I Wayan EKa Dharmawan LIPI 310 Component 2 Pembayaran Belanja Barang (PHN,COREMAP,052) 088 Jakarta III LIPI 210881303017319 26-Oct-2021 1971/PPK/IV/PK/KU/7/202 PT Mitra Utama Varia 91.015.000,00 100% 91.015.000,00 14.165 6.425,34 berupa Pengadaan bahan Penelitian Rekayasa Energi 1 tanggal 22 Juli 2021 Gelombang dan Iklim Mikro Wilayah Pesisir dalam Meningkatkan Produktifitas Kultur Mikroalga Arthospira platensis Koordinator Dr. Nofdianto P2L LIPI 311 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701014363 15-Sep-2021 Bendahara Pengeluaran 2.815.000,00 100% 2.815.000,00 14.165 198,73 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 312 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301019526 22-Oct-2021 Bendahara Pengeluaran 130.417.800,00 100% 130.417.800,00 14.165 9.207,05 berupa perjalanan dinas dalam rangka menghadiri kordinasi dan pelaksanaan pelatihan penilaian kondisi padang lamun di Bali (Niken), dan melakukan survey RPK COREMAP CTI di Pulau Bintan 313 Component 1 Pembayaran Belanja Barang berupa Pembayaran 088 Jakarta III LIPI 210881301018627 13-Oct-2021 Bendahara Pengeluaran 67.678.000,00 100% 67.678.000,00 14.165 4.777,83 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka kegiatan Visiting ke penangkaran karang hias dalam rangka Pengembangan Panduan Batas Maksimum Produksi (BMP) karang hias di BALI 314 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303016804 19-Oct-2021 1243934654 tanggal 1 PT HOME CENTER 23.790.000,00 100% 23.790.000,00 14.165 1.679,49 berupa e purchasing pengadaan belanja modal peralatan Oktober 2021 INDONESIA dan mesin berupa rak penyimpanan sesuai dengan 315 Component 2 Pembayaran Belanja Barang berupa pembayaran 088 Jakarta III LIPI 210881301016136 14-Sep-2021 Bendahara Pengeluaran 216.750.000,00 100% 216.750.000,00 14.165 15.301,80 perjalanan dinas (PHLN, COREMAP,052) dalam rangka mengikuti Workshop Revisi Program Kegiatan Coremap CTI 2021, di Semarang tanggal 12 s.d. 16 September 2021, 316 Component 2 Penggantian Uang persediaan untuk keperluan belanja 088 Jakarta III LIPI 210881301017446 30-Sep-2021 Bendahara Pengeluaran 6.600.000,00 100% 6.600.000,00 14.165 465,94 barang (PHLN, COREMAP,052) dari BPP.4 Mataram 317 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303014383 21-Sep-2021 060-KW/TCJ/IX/2021 PT. TRIASIH CIPTA JAYA 32.100.000,00 100% 32.100.000,00 14.165 2.266,15 berupa pembayaran pengadaan seminar kit workshop tanggal 13 September revisi program dan perencanaan kegiatan COREMAP CTI 2021 Tahun 2021, sesuai kwitansi nomor 060-KW/TCJ/IX/2021 tanggal 13 September 2021 318 Component 1 Penggantian UP untuk keperluan belanja barang (PHLN, 088 Jakarta III LIPI 210881301018322 11-Oct-2021 Bendahara Pengeluaran 8.218.000,00 100% 8.218.000,00 14.165 580,16 COREMAP, 051) dari BPP.4 Mataram 319 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for 140 Khusus Pinjaman Bappenas 211401105001389 13-Okt-21 Boma Kresning 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course dan Hibah Coremap-CTI an Sdr Boma Kresning 320 Component 1 Pemb. Tunjangan Biaya Hidup dll Program Diklat S2 Luar 140 Khusus Pinjaman Bappenas 211401105001321 01-Okt-21 Samuel Radityo Adiprabowo 69.068.540,00 100% 69.068.540 14.165 4.876,00 Negeri Periode Okt - Des 2021 COREMAP-CTI a.n Samuel dan Hibah Radityo Adiprabowo 321 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 140 Khusus Pinjaman Bappenas 211401105001351 06-Okt-21 Restya Rahmaniar 69.068.540,00 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Restya dan Hibah Rahmaniar Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 322 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401105001404 14-Okt-21 Hary Christijanto 65.031.515 100% 65.031.515 14.165 4.591,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n dan Hibah Hary Christijanto 323 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 140 Khusus Pinjaman Bappenas 211401105001348 06-Okt-21 Fauzan Hidayat 69.068.540 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Fauzan Hidayat dan Hibah 324 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Bappenas 211401105001331 04-Okt-21 Meydar H Saleh 69.068.540,00 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri Coremap- dan Hibah CTI an Meydar H Saleh 325 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 140 Khusus Pinjaman Bappenas 211401105001352 06-Okt-21 Ita Wulandari 73.488.020,00 100% 73.488.020 14.165 5.188,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Ita Wulandari dan Hibah 326 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for 140 Khusus Pinjaman Bappenas 211401105001406 14-Okt-21 Selvia Oktaviyani 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course dan Hibah Coremap-CTI a.n Ibu Selvia Oktaviyani 327 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for 140 Khusus Pinjaman Bappenas 211401105001391 13-Okt-21 Ali Muharam 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course dan Hibah Coremap-CTI an Sdr Ali Muharam 328 Component 1 Pemb. Biaya Hidup dll The Science for Sustainable 140 Khusus Pinjaman Bappenas 211401105001393 13-Okt-21 Februanty Suyatiningsih 58.388.130,00 100% 58.388.130 14.165 4.122,00 Fisheries Policy Professional Short Course Coremap-CTI dan Hibah Purnomo a.n Februanty Suyatiningsih Purnomo 329 Component 1 Pemb. Tunjangan Biaya Hidup dll Program S2 Periode 140 Khusus Pinjaman Bappenas 211401105001318 01-Okt-21 Fawzan Bhakti Soffa 69.068.540,00 100% 69.068.540 14.165 4.876,00 Okt - Des 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n dan Hibah Fawzan Bhakti Soffa 330 Component 1 Pemb Tunj Biaya Hidup dll periode Okt-Des 2021 Prog S2 140 Khusus Pinjaman Bappenas 211401105001350 06-Okt-21 Joyke Fredy Bastian Rumajar 69.068.540 100% 69.068.540 14.165 4.876,00 Diklat Gelar LN COREMAP-CTI a.n Joyke Fredy Bastian dan Hibah Rumajar 331 Component 1 Pembayaran Biaya Hidup dll Prog Pelatihan University of 140 Khusus Pinjaman Bappenas 211401105001403 14-Okt-21 Lelly Hasni Pertamawati 58.388.130 100% 58.388.130 14.165 4.122,00 Rhode Island Tahap I LN COREMAP-CTI a.n Ibu Lelly Hasni dan Hibah Pertamawati 332 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for 140 Khusus Pinjaman Bappenas 211401105001402 14-Okt-21 Setyawati 58.388.130,00 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course dan Hibah Coremap-CTI an Setyawati 333 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401105001394 13-Okt-21 Mochamad Idnillah 58.388.130,00 100% 58.388.130 14.165 4.122,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n dan Hibah Bpk Mochamad Idnillah 334 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Bappenas 211401105001319 01-Okt-21 Hariono 69.068.540 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri dan Hibah COREMAP-CTI a.n FNU Hariono 335 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401105001405 14-Okt-21 Angga Nugraha 58.388.130 100% 58.388.130 14.165 4.122,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n dan Hibah Angga Nugraha 336 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401105001396 13-Okt-21 Augy Syahailatua 65.031.515,00 100% 65.031.515 14.165 4.591,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n dan Hibah Augy Syahailatua 337 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 140 Khusus Pinjaman Bappenas 211401105001320 01-Okt-21 Kristina Setiani 69.068.540,00 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Kristina Setiani dan Hibah 338 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 140 Khusus Pinjaman Bappenas 211401105001330 04-Okt-21 Alan Ray Farandy 69.068.540 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri Coremap- dan Hibah CTI an Alan Ray Farandy 339 Component 1 Pemb Biaya Hidup dll Program Pelatihan University of 140 Khusus Pinjaman Bappenas 211401105001392 13-Okt-21 Mochammad Rachadian 58.388.130 100% 58.388.130 14.165 4.122,00 Rhode Island Tahap I LN COREMAP-CTI a.n Mochammad dan Hibah Prayoga Rachadian Prayoga 340 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401105001390 13-Okt-21 Mohamad Agung Widodo 58.388.130,00 100% 58.388.130 14.165 4.122,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n dan Hibah Mohamad Agung Widodo 341 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401105001395 13-Okt-21 Yesi Dewita Sari 58.388.130,00 100% 58.388.130 14.165 4.122,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n dan Hibah Yesi Dewita Sari 342 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 140 Khusus Pinjaman Bappenas 211401105001349 06-Okt-21 Rizkie Satriya Utama 69.068.540 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Rizkie Satriya dan Hibah Utama 343 Component 1 Pemb Tunjangan Biaya Hidup dll Program S2 Periode Okt 140 Khusus Pinjaman Bappenas 211401105001323 04-Okt-21 Desak Made Pera Rosita 69.068.540,00 100% 69.068.540 14.165 4.876,00 - Des 2021 Diklat Luar Negeri Coremap-CTI an Desak dan Hibah Dewi Made Pera Rosita Dewi 344 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881301020276 01-Nov-21 2230/PPK/IV/PK/KU/8/202 PT. Dexatama Niaga 1.520.000.000 100% 1.520.000.000 14.261 106.584,39 berupa Pengadaan Belanja Modal Peralatan dan Mesin 1 tanggal 24 Agustus 2021 Labtekindo Berupa Furniture Laboratorium Bio Industri Laut sesuai dengan SPK No 2230/PPK/IV/PK/KU/8/2021 tanggal 24 Agustus 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 345 Component 1 Pembayaran Sekaligus Paket Kegiatan Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000276 02-Nov-21 PT GRAHAWITA CENDEKIA 146.221.000,00 100% 146.221.000,00 14.261 10.253,21 Perencanaan Ruang Laut Tingkat Dasar Program dan Hibah Coremap-CTI Tahun 2021 346 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301020139 29-Oct-2021 Bendahara Pengeluaran 579.064.000 100% 579.064.000 14.261 40.604,73 berupa Perjalanan dinas dalam rangka kegiatan Pelatihan Penilaian Kondisi Padang Lamun di UNRAM Lombok NTB (Milani), Kegiatan RHM di Kepulauan Seribu (Rikoh), Reef Health Monitoring di Lampung 347 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000292 03-Nov-21 Supriyadi Saleh 2.605.000,00 100% 2.605.000,00 14.261 182,67 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n dan Hibah Supriyadi Saleh 348 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301020438 03-Nov-21 Bendahara Pengeluaran 46.130.455,00 100% 46.130.455 14.261 3.234,73 (PHLN,COREMAP,052) dari BPP.3 Bandung 349 Component 1 embayaran Belanja Barang (PHLN,COREMAP,051) berupa 088 Jakarta III LIPI 210881302015717 29-Oct-2021 KW/126/MN/X/2021 CV. Mega Niaga 14.756.000,00 100% 14.756.000 14.261 1.034,71 pembayaran pengadaan bahan penelitian RHM tanggal 27 Oktober 2021 Lampung Koordinator Tri Aryono sesuai dengan kwitansi nomor KW/126/MN/X/2021 tanggal 27 Oktober 2021 350 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302015711 29-Oct-2021 106/KW/PHJ/X/2021 CV. Putra Harapan Jaya 20.495.000,00 100% 20.495.000 14.261 1.437,14 berupa pembayaran Pengadaan bahan penelitian RHM tanggal 27 Oktober 2021 Lombok Barat NTB Koordinator Bayu Perisha, sesuai dengan kwitansi nomor 106/KW/PHJ/X/2021 tanggal 27 Oktober 2021 351 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302015810 01-Nov-21 8321/K/AR/X/2021 tanggal CV. Anugrah Raya 26.118.000,00 100% 26.118.000 14.261 1.831,43 berupa pengadaan bahan penelitian studi 26 Oktober 2021 keanekaragaman genetik ikan capungan banggai (Pterapo gon kauderni) di Indonesia Koordinator Ucu Yanu Arbi, sesuai kwitansi nomor 8321/K/AR/X/2021 352 Component 1 Pemb. Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401303000461 02-Nov-21 Decky Thao 4.015.027,00 100% 4.015.027,00 14.261 281,54 Perencanaan Ruang Laut Tingkat Dasar Tahun 2021 dan Hibah Diklat Coremap-CTI an Decky Thao 353 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000291 03-Nov-21 Risnadi 2.535.000,00 100% 2.535.000,00 14.261 177,76 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n dan Hibah Risnadi 354 Component 1 Penggantian Uang Persediaan Ke- 18 Pada PPK 06.10 140 Khusus Pinjaman Bappenas 211401303000452 01-Nov-21 Bendahara Pengeluaran 21.350.000,00 100% 21.350.000,00 14.261 1.497,09 untuk Keperluan Belanja Belanja Barang Non dan Hibah Operasional Lainnya 355 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301020096 28-Oct-2021 Bendahara Pengeluaran 37.886.812,00 100% 37.886.812 14.261 2.656,67 (PHLN,COREMAP,052) dari BPP.2 Cibinong 356 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000290 03-Nov-21 Ahmad Rayhan Kamil 2.560.000,00 100% 2.560.000,00 14.261 179,51 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n dan Hibah Ahmad Rayhan Kamil 357 Component 1 Pemb Biaya Hidup dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000301 04-Nov-21 Teni Nawalusi Ir 2.605.000,00 100% 2.605.000,00 14.301 182,16 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Diklat dan Hibah Coremap-CTI an Teni Nawalusi Ir 358 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000299 04-Nov-21 Untung Ismoyo 2.605.000,00 100% 2.605.000,00 14.301 182,16 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n dan Hibah Untung Ismoyo 359 Component 1 Pemb Biaya Hidup dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000300 04-Nov-21 Annis Sholiha 2.605.000,00 100% 2.605.000,00 14.301 182,16 Perencanaan Ruang Laut Tingkat Dasar Tahun 2021 dan Hibah Diklat Coremap-CTI an Annis Sholihat 360 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401303000500 05-Nov-21 Waty Darmawaty 2.605.000,00 100% 2.605.000,00 14.327 181,82 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI a.n Waty Darmawaty 361 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401303000499 05-Nov-21 Indah Damayanti 2.605.000,00 100% 2.605.000,00 14.327 181,82 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI a.n Sdri Indah Damayanti 362 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401302000522 08-Nov-21 Suci Alisafira 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI an Suci Alisafira 363 Component 1 Penggantian Uang Persediaan Ke-19 Pada 140 Khusus Pinjaman Bappenas 211401303000503 08-Nov-21 Bendahara Pengeluaran 59.552.299,00 100% 59.552.299,00 14.268 4.173,84 PPK 06.10 untuk Keperluan Belanja Barang Non Operasio dan Hibah nal Lainnya 364 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302016432 08-Nov-21 KW-34.11.0021 tanggal 4 PT. Arena Multi Media 42.940.000 100% 42.940.000 14.268 3.009,53 berupa paket pengadaan jasa publikasi media online dan November 2021 sosial media kegiatan MonMang COREMAP CTI, Koordinator Dyah R Sugianto BKHH LIPI, sesuai dengan Kwitansi Nomor KW-34.11.0021 tanggal 4 November 2021 365 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401302000523 08-Nov-21 Dhian Widiyani 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI an Dhian Widiyani Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 366 Component 3 Pembayaran Belanja Barang (PHLN,COREMAP,053) 088 Jakarta III LIPI 210881303018585 08-Nov-21 1041065736 tanggal 13 PT. Kawan Lama Sejahtera 35.938.000 100% 35.938.000 14.268 2.518,78 berupa Pengadaan Waste Bin Role Stainless Matt 40L Oktober 2021 untuk Kantor Pusat Penelitian Oseanografi LIPI sesuai dengan Invoice nomor 1041065736 tanggal 13 Oktober 2021 367 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401303000501 05-Nov-21 Anindya Arma Risanti 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI a.n Anindya Arma Risanti 368 Component 1 Pembayaran Fasilitator Pelatihan dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000321 09-Nov-21 Dinah Yunitawati 2.555.000 100% 2.555.000,00 14.268 179,07 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI a.n Dinah Yunitawati 369 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401303000502 05-Nov-21 Irfan Thofiq Firdaus 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI a.n Irfan Thofiq Firdaus 370 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401302000536 08-Nov-21 Eka Yudhistira S.Pi,MM 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI an Eka Yudhistira S.Pi,MM 371 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401302000521 08-Nov-21 Elmy Yasinta Ciptadi 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI an Elmy Yasinta Ciptadi 372 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program 140 Khusus Pinjaman Bappenas 211401302000524 08-Nov-21 R Arief Budikusuma 2.605.000,00 100% 2.605.000,00 14.268 182,58 Pelatnas Tahun 2021 Diklat COREMAP-CTI utk dan Hibah Karyasiswa a.n R Arief Budikusuma 373 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301021289 10-Nov-21 Bendahara Pengeluaran 125.442.000 100% 125.442.000 14.253 8.801,09 berupa perjalanan dinas kegiatan Konsinyering Pengembangan Model AI untuk Analisa Data Foto Terumbu Karang di Malang (Bambang H) dan Biologi Status Populasi dan Pemanfaatan Hiu Terancam di Mataram 374 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302016742 11-Nov-21 76/IGP/K/XI/2021 tanggal CV. Indo Graha Persada 44.146.000,00 100% 44.146.000 14.253 3.097,31 berupa pengadaan Bahan Pelatihan Penilaian Terumbu 5 November 2021 karang dan ekosistem terkait lainnya di Universitas Mataram NTB koordinator Milani Anggiani, sesuai dengan Kwitansi Nomor 76/IGP/K/XI/2021 375 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701019622 11-Nov-21 Bendahara Pengeluaran 12.550.000,00 100% 12.550.000 14.253 880,52 barang (PHLN,COREMAP, 052) Cofunding, dari BPP.4 Mataram 376 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301021302 11-Nov-21 Bendahara Pengeluaran 6.600.000,00 100% 6.600.000 14.253 463,06 (PHLN,COREMAP,052) dari BPP.4 Mataram 377 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303019119 12-Nov-21 K211101/C tanggal 1 PT. New Module 226.363.636,00 100% 226.363.636 14.243 15.892,97 berupa e purchasing pengadaan belanja modal peralatan Nopember 2021 International dan mesin berupa mikroskop fluorescence dan kamera mikroskop, sesuai dengan Kontrak Nomor: 2615/PPK/IV/PK/KU/9/2021 Tanggal 13 September 2021 378 Component 1 Pembayaran International travel Program Coremap-CTI 140 Khusus Pinjaman Bappenas 211401302000548 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.243 1.652,56 Karyasiswa Lelly Hasni Pertamawati a.n PT. Jendela dan Hibah Dunia Wisata 379 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000328 11-Nov-21 Arief Sudianto 2.555.000,00 100% 2.555.000,00 14.243 179,39 Tahun 2021 Diklat COREMAP-CTI a.n Arief Sudianto dan Hibah 380 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401301000194 11-Nov-21 Arief Widianto 3.155.000,00 100% 3.155.000,00 14.243 221,51 Tahun 2021 Diklat COREMAP-CTI a.n Arief Widianto dan Hibah 381 Component 1 Pembayaran International travel Program Coremap-CTI 140 Khusus Pinjaman Bappenas 211401302000547 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.243 1.652,56 Karyasiswa Februanty Suyatiningsih a.n PT. Jendela dan Hibah Dunia Wisata 382 Component 1 Pembayaran International travel Program Coremap-CTI 140 Khusus Pinjaman Bappenas 211401302000546 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.243 1.652,56 Karyasiswa Selvia Octaviani a.n PT. Jendela Dunia Wisata dan Hibah 383 Component 1 Pembayaran International travel Program Coremap-CTI 140 Khusus Pinjaman Bappenas 211401302000549 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.243 1.652,56 Karyasiswa Moh Agung Widodo a.n PT. Jendela Dunia dan Hibah Wisata 384 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301021630 15-Nov-21 Bendahara Pengeluaran 61.045.600 100% 61.045.600 14.243 4.286,01 (PHLN,COREMAP,052) dari BP Pusat Jakarta, 385 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program 140 Khusus Pinjaman Bappenas 211401304000327 11-Nov-21 Ifan Setiawan 2.605.000,00 100% 2.605.000,00 14.243 182,90 Pelatnas Tahun 2021 Diklat COREMAP-CTI utk dan Hibah Karyasiswa a.n Ifan Setiawan 386 Component 1 Pembayaran Belanja Modal(PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303019087 12-Nov-21 K211101/C tanggal 1 PT. New Module 35.700.000 100% 35.700.000 14.243 2.506,49 berupa Pengadaan belanja modal peralatan dan mesin Nopember 2021 International berupa Nikon Imaging Software sesuai dengan kwitansi nomor K211101/C tanggal 1 Nopember 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 387 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401303000512 11-Nov-21 Lia Kusumawati 2.555.000 100% 2.555.000,00 14.243 179,39 Tahun 2021 Diklat COREMAP-CTI a.n Ibu Lia Kusumawati dan Hibah 388 Component 1 Penggantian UP untuk keperluan belanja modal 088 Jakarta III LIPI 210881301021629 15-Nov-21 Bendahara Pengeluaran 18.711.649 100% 18.711.649 14.243 1.313,74 (PHLN,COREMAP,051) dari BP Pusat Jakarta 389 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303019448 17-Nov-21 1364/PPK/IV/PK/KU/6/202 PT. Genecraft Lab 129.000.000 100% 129.000.000 14.211 9.077,48 berupa pembayaran Pengadaan Jasa Kalibrasi dan 1 Tanggal 2 Juni 2021 Penggantian Sparepart Peralatan Laboratorium Puslit Oseanografi berupa alat GCMS sesuai dengan SPK Nomor: 1364/PPK/IV/PK/KU/6/2021 Tanggal 2 Juni 2021 390 Component 1 Pemb Tunjangan Pelatihan dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401302000557 17-Nov-21 Risty Utami dkk (8 Orang) 25.118.746 100% 25.118.746,00 14.211 1.767,56 Perencanaan Ruang Laut Tingkat Menengah I Th 2021 dan Hibah Coremap-CTI an Risty Utami dkk (8 Orang) 391 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701020450 16-Nov-21 Bendahara Pengeluaran 210.968.564 100% 210.968.564 14.211 14.845,44 barang (PHLN,COREMAP, 051) dari BP Pusat Jakart 392 Component 1 Pembayaran International Travel Program Diklat Luar 140 Khusus Pinjaman Bappenas 211401302000556 17-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.211 1.656,29 Negeri Coremap-CTI Karyasiswa Setyawati a.n PT. dan Hibah Jendela Dunia Wisata 393 Component 1 Pembayaran Tunjangan Biaya Hidup Prog Pelatnas 140 Khusus Pinjaman Bappenas 211401302000551 15-Nov-21 Stevanus Bayu Mangkurat 2.110.000,00 100% 2.110.000,00 14.211 148,48 Tahun 2021 Diklat COREMAP-CTI utk Karyasiswa a.n R. dan Hibah Stevanus Bayu Mangkurat 394 Component 1 Pemb Tunj Pelatihan dll Pelatihan Nasional Perencanaan 140 Khusus Pinjaman Bappenas 211401303000515 17-Nov-21 Kholqi Azam Rizaldi dkk 4 16.128.545,00 100% 16.128.545,00 14.211 1.134,93 Ruang Laut Tingkat Dasar Th 2021 Coremap-CTI an Sdr dan Hibah Orang Kholqi Azam Rizaldi dkk 4 Orang 395 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701020455 16-Nov-21 Bendahara Pengeluaran 73.950.854 100% 73.950.854 14.211 5.203,78 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 396 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701020454 16-Nov-21 Bendahara Pengeluaran 9.002.000 100% 9.002.000 14.211 633,45 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 397 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program 140 Khusus Pinjaman Bappenas 211401303000514 15-Nov-21 Kemal Pramayuda 2.605.000,00 100% 2.605.000,00 14.211 183,31 Pelatihan Nasional Tahun 2021 Diklat COREMAP-CTI a.n dan Hibah Sdr Kemal Pramayuda 398 Component 1 Pemb Tunj Pelatihan dll Pelatihan Nasional Perencanaan 140 Khusus Pinjaman Bappenas 211401301000200 17-Nov-21 Muhammad Danny 2.110.000,00 100% 2.110.000,00 14.211 148,48 Ruang Laut Tingkat Dasar Th 2021 Coremap-CTI an dan Hibah Sianggaputra Muhammad Danny Sianggaputra 399 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Tahun 140 Khusus Pinjaman Bappenas 211401304000335 15-Nov-21 Lalu Deden Yuda Pratama 2.605.000,00 100% 2.605.000,00 14.211 183,31 2021 Diklat COREMAP-CTI a.n Lalu Deden Yuda Pratama dan Hibah 400 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000336 15-Nov-21 Donny Orlando W 2.605.000,00 100% 2.605.000,00 14.211 183,31 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI a.n Donny Orlando W 401 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program 140 Khusus Pinjaman Bappenas 211401304000332 15-Nov-21 Yusuf Arief Afandy 2.605.000,00 100% 2.605.000,00 14.211 183,31 Pelatnas Tahun 2021 Diklat COREMAP-CTI utk dan Hibah Karyasiswa a.n Yusuf Arief Afandy 402 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Tahun 140 Khusus Pinjaman Bappenas 211401304000333 15-Nov-21 Irvan Muhammad, dkk (2 5.210.000,00 100% 5.210.000,00 14.211 366,62 2021 Diklat COREMAP-CTI a.n Irvan Muhammad, dkk (2 dan Hibah Orang) Orang) 403 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301021755 15-Nov-21 Bendahara Pengeluaran 6.796.100,00 100% 6.796.100 14.211 478,23 (PHLN,COREMAP,052) dari BPP.4 Mataram 404 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000334 15-Nov-21 Suryadi Fadillah 2.605.000,00 100% 2.605.000,00 14.211 183,31 Perencanaan Ruang Laut Tingkat Dasar Th 2021 dan Hibah Coremap-CTI a.n Suryadi Fadillah 405 Component 1 Pembayaran Belanja modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881301022164 19-Nov-21 KWT 202101060 Tanggal PT. Emiindo Jaya Bersama 39.077.273,00 100% 39.077.273 14.231 2.745,93 berupa permbayaran e purchasing belanja modal 12 November 2021 peralatan dan mesin berupa UV Sterilizer, sesuai dengan Kwitansi Nomor KWT 202101060 Tanggal 12 November 2021 406 Component 1 Penggantian Uang Persediaan Ke-20 Pada PPK 06.10 140 Khusus Pinjaman Bappenas 211401303000516 18-Nov-21 Bendahara Pengeluaran 78.343.442,00 100% 78.343.442,00 14.231 5.505,13 untuk Keperluan Belanja Barang Non Operasional dan Hibah Lainnya 407 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional PRL Tingkat 140 Khusus Pinjaman Bappenas 211401303000523 19-Nov-21 Bpk M Mukhlis Kamal, Dkk 7.351.970,00 100% 7.351.970,00 14.231 516,62 Menengah II Th 2021 Coremap-CTI a.n Bpk M Mukhlis dan Hibah (3 Orang) Kamal, Dkk (3 Orang) 408 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303019796 19-Nov-21 1244036429 tanggal 15 PT. Home Center Indonesia 12.530.000,00 100% 12.530.000 14.231 880,47 berupa e purchasing belanja modal peralatan dan mesin November 2021 berupa loker dan meja tamu,sesuai dengan kuitansi Nomor 1244036429 tanggal 15 November 2021, 409 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional Perencanaan 140 Khusus Pinjaman Bappenas 211401304000342 19-Nov-21 Hatim Albasri SPI dkk 2 6.095.730,00 100% 6.095.730,00 14.231 428,34 Ruang Laut Tingkat Menengah II Th 2021 Coremap-CTI dan Hibah Orang an Hatim Albasri SPI dkk 2 Orang Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 410 Component 3 Pembayaran belanja barang (PHLN,COREMAP,053) 088 Jakarta III LIPI 210881301022039 18-Nov-21 Bendahara Pengeluaran 47.360.000,00 100% 47.360.000 14.231 3.327,95 berupa perjalanan dinas dalam rangka Koordinasi dan pengurusan dokumen pertanggungjawaban keuangan kegiatan Coremap CTI dan penyelesaian pembayaran dokumen dokumen kontrak LOB RHM Teluk Cenderawasih 411 Component 1 Pembayaran Biaya Hidup dll Pelatihan Nasional PRL 140 Khusus Pinjaman Bappenas 211401304000341 19-Nov-21 Yudi Wahyudin, S.PI, M.SI 10.860.000,00 100% 10.860.000,00 14.231 763,12 Tingkat Menengah Angkatan II Tahun 2021 Coremap-CTI dan Hibah a.n Yudi Wahyudin, S.PI, M.SI 412 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000340 19-Nov-21 Hendra Kusuma Wardana, 5.155.000,00 100% 5.155.000,00 14.231 362,24 Nasional COREMAP-CTI a.n Hendra Kusuma Wardana, dan Hibah dkk 2 Org dkk 2 Org 413 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301022239 22-Nov-21 Bendahara Pengeluaran 78.730.000,00 100% 78.730.000 14.255 5.522,97 (PHL,COREMAP,052) dari BP Pusat Jakarta, 414 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional PRL Tingkat 140 Khusus Pinjaman Bappenas 211401302000566 22-Nov-21 Prof. Dr. Ir. Akhmad Fauzi 36.454.520,00 100% 36.454.520,00 14.255 2.557,31 Menengah II Th 2021 Coremap-CTI a.n Prof. Dr. Ir. dan Hibah M.Sc, dkk (4 Orang) Akhmad Fauzi M.Sc, dkk (4 Orang) 415 Component 1 Pembayaran International Travel Program Diklat Luar 140 Khusus Pinjaman Bappenas 211401302000571 23-Nov-21 PT. Jendela Dunia Wisata 23.531.636,00 100% 23.531.636,00 14.255 1.650,76 Negeri Coremap-CTI Karyasiswa Mochamad Idnillah a.n dan Hibah PT. Jendela Dunia Wisata 416 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program 140 Khusus Pinjaman Bappenas 211401301000203 22-Nov-21 Danang Pramudita 2.855.000,00 100% 2.855.000,00 14.255 200,28 Pelatihan Nasional Menengah Angkatan II COREMAP-CTI dan Hibah a.n Danang Pramudita 417 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401301000202 22-Nov-21 Hadi Prayitno, dkk 2 Org 6.652.520,00 100% 6.652.520,00 14.255 466,68 Nasional COREMAP-CTI a.n Hadi Prayitno, dkk 2 Org dan Hibah 418 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000345 23-Nov-21 Tendy Kuhaja S.PI 2.412.000,00 100% 2.412.000,00 14.255 169,20 Nasional Menengah I COREMAP-CTI a.n Tendy Kuhaja dan Hibah S.PI 419 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000346 23-Nov-21 Giri Wilisandy 2.329.000,00 100% 2.329.000,00 14.255 163,38 Nasional PRL Tingkat Menengah I Tahun 2021 Diklat dan Hibah Coremap-CTI an Giri Wilisandy 420 Component 1 Pembayaran Tuition Fee Fall 2021-Spring 2022 dll Prog 140 Khusus Pinjaman Bappenas 211401105001536 15-Nov-21 University of Rhode Island 2.329.994.005,00 100% 2.329.994.005,00 14.255 163.451,00 S2 LN utk Karyasiswa Desak Made Pera Rosita Dewi, dkk dan Hibah 5 Orang a.n URI 421 Component 1 Pemb TF Fall 2021 dll Prog S2 LN Diklat Coremap-CTI 140 Khusus Pinjaman Bappenas 211401105001539 15-Nov-21 University of Rhode Island 1.771.953.520,00 100% 1.771.953.520,00 14.255 124.304,00 Karyasiswa Joyke Fredy Bastian Rumajar dkk(7 Orang) dan Hibah a.n University of Rhode Island 422 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701021962 29-Nov-21 Bendahara Pengeluaran 110.074.047 100% 110.074.047 14.280 7.708,27 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 423 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701021961 29-Nov-21 Bendahara Pengeluaran 477.050.577 100% 477.050.577 14.280 33.406,90 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta 424 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701021963 29-Nov-21 Bendahara Pengeluaran 163.257.000 100% 163.257.000 14.280 11.432,56 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 425 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701021965 29-Nov-21 Bendahara Pengeluaran 147.434.807 100% 147.434.807 14.280 10.324,57 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 426 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401303000525 26-Nov-21 Endiena Bulan Mutiara Sani, 9.305.104,00 100% 9.305.104,00 14.340 648,89 Nasional COREMAP-CTI a.n Endiena Bulan Mutiara Sani, dan Hibah dkk 4 Orang dkk 4 Orang 427 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301023059 29-Nov-21 Bendahara Pengeluaran 49.805.225 100% 49.805.225 14.340 3.473,17 (PHLN,COREMAP,052) dari BPP.3 Bandung 428 Component 1 pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881301023250 30-Nov-21 Bendahara Pengeluaran 400.603.000 100% 400.603.000 14.340 27.936,05 berupa perjalanan dinas dalam rangka kegiatan sertifikasi penilai kondisi padang lamun dan komunitas mangroove di univ. pattimura ambon dan univ. hasanuddin makassar 429 Component 1 embayaran Belanja Modal (PHLN,COREMAP,051) berupa 088 Jakarta III LIPI 210881302017971 30-Nov-21 2823/PPK/IV/PK/KU/9/202 PT. ASTRAGRAPHIA XPRINS 145.409.091 100% 145.409.091 14.340 10.140,10 e purchasing belanja modal peralatan dan mesin berupa 1 Tanggal 24 September INDONESIA Smart TV digital signage, sesuai dengan SPK Nomor: 2021, 2823/PPK/IV/PK/KU/9/2021 Tanggal 24 September 2021, 430 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401302000584 26-Nov-21 Tommy Hermawan, dkk (2 5.075.000,00 100% 5.075.000,00 14.340 353,91 Nasional COREMAP-CTI a.n Tommy Hermawan, dkk (2 dan Hibah Orang) Orang) 431 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301023065 29-Nov-21 Bendahara Pengeluaran 36.200.000,00 100% 36.200.000 14.340 2.524,41 berupa pembayaran Honorarium pengajar dan asisten pengajar pelatihan penilaian kondisi padang lamun dan mangrove di Universitas Udayana Bali 432 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701021966 29-Nov-21 Bendahara Pengeluaran 78.115.013,00 100% 78.115.013 14.340 5.447,35 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 433 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701021968 29-Nov-21 Bendahara Pengeluaran 47.042.000,00 100% 47.042.000 14.340 3.280,47 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 434 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701021964 29-Nov-21 Bendahara Pengeluaran 3.650.000,00 100% 3.650.000 14.340 254,53 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 435 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000350 25-Nov-21 Suryadi Fadillah 2.469.057,00 100% 2.469.057,00 14.340 172,18 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- dan Hibah CTI a.n Suryadi Fadillah 436 Component 1 Pembayaran Tunjangan Biaya Hidup dll Pelatihan 140 Khusus Pinjaman Bappenas 211401304000349 25-Nov-21 Arief Sudianto 1.998.000,00 100% 1.998.000,00 14.340 139,33 Nasional PRL Tingkat Menengah Angkatan II Tahun 2021 dan Hibah Coremap-CTI a.n Arief Sudianto 437 Component 1 Pemb Tunj Pelatihan dll Prog Pelatihan Nasional PRL 140 Khusus Pinjaman Bappenas 211401304000356 26-Nov-21 Yuli Deviani Riadi, Dkk(2 4.603.794,00 100% 4.603.794,00 14.340 321,05 Tingkat Menengah II Tahun 2021 Coremap-CTI a.n Yuli dan Hibah Orang) Deviani Riadi, Dkk(2 Orang) 438 Component 2 Penggantian UP untuk Keperluan Belanja Barang 088 Jakarta III LIPI 210881301023182 30-Nov-21 Bendahara Pengeluaran 18.210.000,00 100% 18.210.000 14.340 1.269,87 (PHLN,COREMAP,052) dari BPP.1 Ambon 439 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301023183 30-Nov-21 Bendahara Pengeluaran 49.610.300,00 100% 49.610.300 14.340 3.459,57 (PHLN,COREMAP,052) dari BPP2 Cibinong`` 440 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000357 26-Nov-21 I Gede Wina Parmana Putra 4.622.337,00 100% 4.622.337,00 14.340 322,34 Nasional PRL Tingkat Menengah I Tahun 2021 Coremap- dan Hibah CTI a.n I Gede Wina Parmana Putra 441 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000351 25-Nov-21 Deenisa Rochadjia, dkk 6 23.535.476,00 100% 23.535.476,00 14.340 1.641,25 Nasional Diklat COREMAP-CTI a.n Deenisa Rochadjia, dkk dan Hibah Orang 6 Orang 442 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701021967 29-Nov-21 Bendahara Pengeluaran 3.693.000,00 100% 3.693.000 14.340 257,53 barang (PHLN,COREMAP, 053) dari BPP.5 P2O Jakarta 443 Component 1 Pemb Travel Insurance Program Diklat Luar Negeri 140 Khusus Pinjaman Bappenas 211401302000577 25-Nov-21 PT Zurich Asuransi Indonesia 9.833.000,00 100% 9.833.000,00 14.340 685,70 Coremap-CTI Karyasiswa Mochamad Idnillah dkk (13 dan Hibah orang) a.n PT Zurich Asuransi Indonesia 444 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301023060 29-Nov-21 Bendahara Pengeluaran 59.900.000,00 100% 59.900.000 14.340 4.177,13 (PHLN,COREMAP,052) dari BPP.5 Jakarta 445 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701022038 30-Nov-21 Bendahara Pengeluaran 440.000,00 100% 440.000 14.340 30,68 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 446 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401301000204 25-Nov-21 Arief Widianto 2.243.000,00 100% 2.243.000,00 14.340 156,42 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- dan Hibah CTI a.n Arief Widianto 447 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000358 26-Nov-21 Supradianto Nugroho 2.505.000,00 100% 2.505.000,00 14.340 174,69 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- dan Hibah CTI a.n Supradianto Nugroho 448 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000348 25-Nov-21 Yusuf Arief Afandy 2.734.090,00 100% 2.734.090,00 14.340 190,66 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- dan Hibah CTI a.n Yusuf Arief Afandy 449 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000360 26-Nov-21 Budi Mulyono 2.205.000,00 100% 2.205.000,00 14.340 153,77 Nasional Perencanaan Diklat COREMAP-CTI a.n Budi dan Hibah Mulyono 450 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401304000359 26-Nov-21 Alex Fransisca 2.155.000,00 100% 2.155.000,00 14.340 150,28 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- dan Hibah CTI a.n Alex Fransisca 451 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301022841 26-Nov-21 056/KW-BaCls/XI/2021 CV. BACLS 7.304.545,00 100% 7.304.545 14.340 509,38 cofunding berupa pembelian Fucoidan, Fucoxanthin dan tanggal 10 November 2021 EPA Nitrosamine Mix, sesuai dengan Kwitansi Nomor 056/KW-BaCls/XI/2021 tanggal 10 November 2021 452 Component 1 ertanggungjawaban TUP utnuk keperluan belanja barang 088 Jakarta III LIPI 210881701022037 30-Nov-21 Bendahara Pengeluaran 8.800.000,00 100% 8.800.000 14.340 613,67 (PHLN,COREMAP, 051) dari BPP.4 Mataram 453 Component 1 Pemb Bench Fee 2021-2022 dll Program S2 Luar Negeri 140 Khusus Pinjaman Bappenas 211401105001613 26-Nov-21 University of Rhode Island 287.244.540,00 100% 287.244.540,00 14.340 20.031,00 Coremap-CTI utk Desak Made Pera Rosita Dewi dkk 5 dan Hibah Orang an University of Rhode Island 454 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881301023875 3-Dec-2021 Bendahara Pengeluaran 611.655.000,00 100% 611.655.000,00 14.348 42.629,98 berupa perjalanan dinas dalam rangka kegiatan Konsinyering Data RHM serta Workshop Evaluasi Kegiatan RHM dan Inisiasi Jejaring pada tanggal 2 s.d. 9 Desember 2021 455 Component 3 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301024304 7-Dec-2021 Bendahara Pengeluaran 31.830.029,00 100% 31.830.029,00 14.348 2.218,43 (PHLN,COREMAP,053) dari BP Pusat Jakarta 456 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701022653 2-Dec-2021 Bendahara Pengeluaran 406.788.052,00 100% 406.788.052,00 14.348 28.351,55 barang (PHLN,COREMAP, 051) dari BPG Pusat Jakarta 457 Component 1 Penggantian Uang Persediaan Ke-21 Pada PPK 06.10 140 Khusus Pinjaman Bappenas 211401303000557 02-Dec-21 BPG 019 KEMENTERIAN PPN 1.648.400 100% 1.648.400,00 14.348 114,89 untuk Keperluan Belanja Barang Non Operasional dan Hibah /BAPPENAS Lainnya 458 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303020933 1-Dec-2021 3517/PPK/IV/PK/KU/10/20 CV. Wisata Karya 198.413.000,00 100% 198.413.000,00 14.348 13.828,62 berupa pengadaan Tirai Roler Blind dan Smoke ring 21 Tanggal 28 Oktober Gorden Gedung balai bio industri laut sesuai dengan SPK 2021 No Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 459 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301023662 2-Dec-2021 Bendahara Pengeluaran 102.984.423,00 100% 102.984.423,00 14.348 7.177,62 berupa perjalanan dinas dalam rangka kegiatan pelatihan penilai kondisi komunitas mangrove dan padang lamun di universitas pattimura Ambon, tanggal 23 s.d. 30 November 2021 460 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301024279 7-Dec-2021 Bendahara Pengeluaran 13.231.600,00 100% 13.231.600,00 14.348 922,19 (PHLN,COREMAP,052) dri BPP.2 Cibinong 461 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303021282 2-Dec-2021 3861/PPK/IV/PK/KU/11/20 PT. Triasih Cipta Jaya 185.000.000,00 100% 185.000.000,00 14.348 12.893,78 pengadaan Belanja Modal Peralatan dan mesin berupa 21 Tanggal 15 Nopember Perangkat pengolah data 2021 462 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301023885 3-Dec-2021 Bendahara Pengeluaran 31.799.000,00 100% 31.799.000,00 14.348 2.216,27 (PHLN,COREMAO,052) dari BPP2 Cibinong 463 Component 2 PErtanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701022651 2-Dec-2021 Bendahara Pengeluaran 184.666.930,00 100% 184.666.930,00 14.348 12.870,57 barang (PHLN,COREMAP,05 2) dari BPP2 cibinong 464 Component 1 Pembayaran Belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881304001481 8-Dec-2021 SPK Nomor: UNPATTI Ambon 199.360.000,00 100% 199.360.000,00 14.348 13.894,62 berupa Paket Pengadaan Swakelola Jasa Live On Board 3469/PPK/IV/PK/KU/10/20 RHM di Teluk Cendrawasih 21 Tanggal 29 Oktober 2021, 465 Component 3 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301023400 1-Dec-2021 Bendahara Pengeluaran 79.688.200,00 100% 79.688.200,00 14.348 5.553,96 (PHLN,COREMAP, 053) dari BP Pusat Jakarta 466 Component 1 Pembayaran Tunjangan Pelatihan dll Pelatihan Nasional 140 Khusus Pinjaman Bappenas 211401304000386 03-Dec-21 Muhammad Aththaar Nazim 4.485.088 100% 4.485.088,00 14.348 312,59 PRL Tingkat Menengah II Tahun 2021 Diklat Coremap-CTI dan Hibah a.n Muhammad Aththaar Nazim 467 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701022430 1-Dec-2021 Bendahara Pengeluaran 14.427.750,00 100% 14.427.750,00 14.348 1.005,56 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 468 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701022429 1-Dec-2021 Bendahara Pengeluaran 78.661.420,00 100% 78.661.420,00 14.348 5.482,40 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta 469 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301023874 3-Dec-2021 Bendahara Pengeluaran 58.526.100,00 100% 58.526.100,00 14.348 4.079,04 berupa perjalanan dinas kegiatan Focus Group Discussion (FGD) dan Konsinyering Pembahasan Dokumen Kajian COREMAP Legacy Study di Bandung Jawa Barat 470 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881301024303 7-Dec-2021 Bendahara Pengeluaran 37.460.700,00 100% 37.460.700,00 14.348 2.610,87 (PHLN,COREMAP,052) dari BP Pusat Jakarta 471 Component 1 Pemb Tunj Pelatihan dll Prog Pelatihan Nasional PRL 140 Khusus Pinjaman Bappenas 211401302000607 01-Dec-21 Nurfitri Syadiah 23.166.568 100% 23.166.568,00 14.348 1.614,62 Tingkat Menengah II Tahun 2021 Coremap-CTI a.n dan Hibah Nurfitri Syadiah 472 Component 1 Pembayaran Biaya Hidup dll Program Pendidikan dan 140 Khusus Pinjaman Bappenas 211401105001669 08-Dec-21 Selvia Oktaviyani 17.074.120 100% 17.074.120,00 14.348 1.190,00 Pelatihan Luar Negeri COREMAP-CTI a.n Ibu Selvia dan Hibah Oktaviyani 473 Component 1 Pemb Pelatihan The Science for Sustainable Fisheries 140 Khusus Pinjaman Bappenas 211401105001629 02-Dec-21 University of Rhode Island 720.169.164 100% 720.169.164,00 14.348 50.193,00 Policy Professional Short Course dll Coremap-CTI utk dan Hibah Augy Syahailatua dkk 13 Org an 474 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401105001647 03-Dec-21 Setyawati 13.487.120 100% 13.487.120,00 14.348 940,00 COREMAP-CTI a.n Setyawati dan Hibah 475 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for 140 Khusus Pinjaman Bappenas 211401105001651 06-Dec-21 Lelly Hasni Pertamawati 13.487.120 100% 13.487.120,00 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II dan Hibah an Ibu Lelly Hasni Pertamawati 476 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan 140 Khusus Pinjaman Bappenas 211401105001646 03-Dec-21 Mochamad Idnillah 13.487.120 100% 13.487.120,00 14.348 940,00 COREMAP-CTI a.n Bpk Mochamad Idnillah dan Hibah 477 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for 140 Khusus Pinjaman Bappenas 211401105001665 06-Dec-21 Februanty Suyatiningsih 13.487.120 100% 13.487.120,00 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II dan Hibah Purnomo an Februanty Suyatiningsih Purnomo 478 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302019360 10-Dec-2021 SPK Nomor: PT. Elo Karsa Utama 115.454.545,00 100% 115.454.545,00 14.378 8.029,94 berupa e purchasing pengadaan belanja modal Peralatan 3768/PPK/IV/PK/KU/11/20 dan mesin berupa Bio Safety Cabinet sesuai 21 Tanggal 11 Nopember 2021 479 Component 2 pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302019487 13-Dec-2021 Kwitansi nomor CV. Putra Harapan Jaya 29.056.000,00 100% 29.056.000,00 14.378 2.020,87 berupa pengadaan bahan un tuk kegiatan sertifikasi 139/KW/PHJ/XII/2021 kompetensi skema penilai kondisi mangrove di TUK tanggal 3 Desember 2021 Universitas Hasanuddin Makasar 480 Component 1 Pembayaran International Travel Program Diklat Luar 140 Khusus Pinjaman Bappenas 211401302000658 09-Dec-21 PT. Jendela Dunia Wisata 23.537.473 100% 23.537.473,00 14.378 1.637,05 Negeri Coremap-CTI Karyasiswa Hary Christijanto a.n PT. dan Hibah Jendela Dunia Wisata 481 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301024796 13-Dec-2021 2997/PPK/IV/PK/KU/10 CV. Dwi Srikandi 141.545.000,00 100% 141.545.000,00 14.378 9.844,55 berupa pengadaan Bahan kimia indent pemafaatan kulit ikan tuna sebagai sumber kolagen untuk pengembangan nutrasetikal anti inflamasi bagi penderita covid 19 482 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302019513 13-Dec-2021 kwitansi Nomor CV. Almira Karabela 37.081.000,00 100% 37.081.000,00 14.378 2.579,01 berupa pengadaan bahan kegiatan uji kompetensi lamun 45/K/AK/XI/2021 tanggal 9 di TUK Universitas mataram November 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 483 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302019488 13-Dec-2021 kwitansi nomor PT. Elo Karsa Utama 36.533.000,00 100% 36.533.000,00 14.378 2.540,90 berupa pengadaan bahan penelitian makroalgae sebagai KWT/2122776/12/2021 pakan dan sumber antioksidan (Koodinator Idham tanggal 3 Desember 2021 Sumarto Pratama BBIL), 484 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023571 13-Dec-2021 Bendahara Pengeluaran 2.223.788,00 100% 2.223.788,00 14.378 154,67 barang (PHLN,COREMAP, 052) dari BPP4 Mataram 485 Component 1 pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302019527 13-Dec-2021 Kwitansi nomor CV. Glory Heart 47.832.000,00 100% 47.832.000,00 14.378 3.326,75 berupa pengadaan bahan kegiatan sertifikasi skema 66/GH/K/XI/2021 tanggal padang lamun di universitas pattimura, 25 November 2021 486 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302019524 13-Dec-2021 kwitansi nomor CV. Inovasi Multi Kreasi 34.136.000,00 100% 34.136.000,00 14.378 2.374,18 berupa pengadaan bahan konsinyering data RHM dan 080/K/IMK/XII/2021 workshop evaluasi RHM COREMAP CTI 2021, tanggal 1 Desember 2021 487 Component 2 Pertannggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023570 13-Dec-2021 Bendahara Pengeluaran 15.262.500,00 100% 15.262.500,00 14.378 1.061,52 barang (PHLN,COREMAP, 052) Cofunding dari BPP4 Mataram 488 Component 2 Pembayaran belanja barang (PHLN, COREMAP,052) 088 Jakarta III LIPI 210881303022462 13-Dec-2021 3858/PPK/IV/PK/KU/11/20 PT. Trans News Corpora 100.000.000,00 100% 100.000.000,00 14.378 6.955,07 berupa pengadaan jasa diseminasi informasi kegiatan 21 Tanggal 16 Nopember COREMAP-CTI melalui program Techt talk, 2021 489 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303022576 13-Dec-2021 kwitansi nomor CV. Asking Prima Kencana 19.605.000,00 100% 19.605.000,00 14.378 1.363,54 berupa pengadaan bahan untuk kegiatan kajian legasi 057/K/CV.APK/XI/2021 Coremap CTI konsinyering analisa akhir tahun tanggal 26 November 2021. 490 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302019520 13-Dec-2021 kwitansi nomor CV. Pasundan Biotech 13.150.000,00 100% 13.150.000,00 14.378 914,59 berupa pengadaan bahan Penelitian pengembagan K051PB122021 tanggal 1 mikroba Asosiasi spons sebagai biokatalis untuk Desember 2021 mendukung teknologi farmasi, 491 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303022553 13-Dec-2021 SP nomor : SUA MST PRENEUR 49.500.000,00 100% 49.500.000,00 14.378 3.442,76 berupa pekerjaan pengadaan jasa lainnya kerjasama 3343/PPK/IV/PK/KU/10/20 pemetaan dan pelatihan Drone Deputi ilmu 21 tanggal 19 Oktober pengetahuan kebumian BRIN 2021 492 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303022577 13-Dec-2021 Kwitansi nomor KW254495- PT. Genetika Science 10.270.000,00 100% 10.270.000,00 14.378 714,29 berupa pengadaan bahan penelitian bioassesment NR tanggal 24 November Indonesia terhadap pencemaran logan berat Pb dan Cd pada 2021 sedimen dan air di teluk jakarta 493 Component 1 Pemb International travel Prog Coremap-CTI utk 140 Khusus Pinjaman Bappenas 211401302000675 13-Dec-21 PT. Jendela Dunia Wisata 47.570.332 100% 47.570.332,00 14.378 3.308,55 Karyasiswa Augy Syahailatua, dkk 2 orang a.n PT. Jendela dan Hibah Dunia Wisata 494 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303022465 13-Dec-2021 Invoice nomor PT. Radio Trijaya Shakti 40.000.000,00 100% 40.000.000,00 14.378 2.782,03 berupa pengadaan jasa media campaign Bumi Kita untuk TRJK/2111/K014 tanggal 6 kegiatan Diseminasi Coremap CTI (Koord Dyah R Desember 2021 Sugianto) 495 Component 1 Pemb International travel Prog Coremap-CTI utk 140 Khusus Pinjaman Bappenas 211401302000676 13-Dec-21 PT. Jendela Dunia Wisata 47.570.270 100% 47.570.270,00 14.378 3.308,55 Karyasiswa Mochammad Rachadian Prayoga, dkk 2 org dan Hibah a.n PT. Jendela Dunia Wisata 496 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302019512 13-Dec-2021 kwitansi nomor 096/K/CV- CV. Pancuran Emas Jaya 43.109.000,00 100% 43.109.000,00 14.378 2.998,26 berupa pengadaan bahan kegiatan sertifikasi PEJ/XI/2021 tanggal 18 kompetensi skemaMangrove dan Lamun di TUK November 2021 Universitas Diponegoro, 497 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302019526 13-Dec-2021 kwitansi nomor CV. Central Cakra Buana 30.016.000 100% 30.016.000,00 14.378 2.087,63 berupa pengadaan bahan pe latihan pemantau penilai 55/K/CV.CCB/11/2021 komunitas mangrove dan padang lamun di Universitas Tanggal 23 November 2021 pattimura 498 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881302019528 13-Dec-2021 Invoice No CV. Endamora Maju 42.500.000,00 100% 42.500.000,00 14.378 2.955,90 berupa pengadaan jasa diseminasi informasi kegiatan INV/124/XI/2021 tanggal bersama coremap CTI melalui program pemberitaan LKBN Antara 30 November 2021 499 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023693 14-Dec-2021 Bendahara Pengeluaran 599.061.725 100% 599.061.725,00 14.348 41.752,28 barang (PHLN,COREMAP, 051) dari BPP pusat Jakarta 500 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023687 14-Dec-2021 Bendahara Pengeluaran 316.355.172 100% 316.355.172,00 14.348 22.048,73 barang (PHLN,COREMAP, 052) dari BPP.5 P2O jakarta 501 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302019574 13-Dec-2021 Kontrak Nomor: Phoenix Hotel Yogyakarta 232.317.000 100% 232.317.000,00 14.348 16.191,59 berupa Pekat meeting konsinyering data RHM, 4071/PPK/IV/PK/KU/12/20 Workshop Evaluasi dan inisiasi jejaring RHM nasional serta pembahasan Renja anggaran Coremap 2022, 502 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023691 14-Dec-2021 Bendahara Pengeluaran 703.830.082 100% 703.830.082,00 14.348 49.054,23 barang (PHLN,COREMAP, 503 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023689 14-Dec-2021 Bendahara Pengeluaran 157.974.098 100% 157.974.098,00 14.348 11.010,18 barang (PHLN,COREMAP, 052) dari BPP.5 P2) Jakarta 504 Component 1 Pembayaran International Travel Program Pelatihan 140 Khusus Pinjaman Bappenas 211401302000692 14-Dec-21 PT. Jendela Dunia Wisata 47.570.270 100% 47.570.270,00 14.348 3.315,46 Diklat Luar Negeri Coremap-CTI utk Karyasiswa Boma dan Hibah Kresning, dkk (2 orang) Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 505 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023696 14-Dec-2021 Bendahara Pengeluaran 1.700.000 100% 1.700.000,00 14.348 118,48 barang (PHLN,SOREMAP, 052) Cofundin 506 Component 2 pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023690 14-Dec-2021 Bendahara Pengeluaran 138.259.061 100% 138.259.061,00 14.348 9.636,12 barang (PHLN,COREMAP, 052) dari BPP.1 Ambon 507 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302019575 14-Dec-2021 kwitansi nomor CV. Alsabil Jaya Mandiri 24.630.000 100% 24.630.000,00 14.348 1.716,62 berupa pengadaan bahan perlengkapan laboratorium 76/K/AJM/XII/2021 tanggal Puslit Oseanografi LIPI, 10 Desember 2021 508 Component 2 Pertanggungjawaban TUP untuk keprluan belanja barang 088 Jakarta III LIPI 210881701023695 14-Dec-2021 Bendahara Pengeluaran 151.292.132 100% 151.292.132,00 14.348 10.544,48 (PHLN,COREMAP, 052) dari BPP.3 Bandung 509 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023692 14-Dec-2021 Bendahara Pengeluaran 29.523.940 100% 29.523.940,00 14.348 2.057,70 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 510 Component 1 Pembelian Belanja Barang (PHLN,COREMAP,051) berupa 088 Jakarta III LIPI 210881303022924 14-Dec-2021 KW018/RST/XII/21 tanggal PT. Royal Sarana Teknika 19.500.000 100% 19.500.000,00 14.348 1.359,07 pengadaan jasa perbaikan lemari pendingin 10 Desember 2021 laboratorium mikrobiologi P2O LIPI sesuai dengan kwitansi nomor KW018/RST/XII/21 tanggal 10 Desember 2021 511 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701023688 14-Dec-2021 Bendahara Pengeluaran 38.790.000 100% 38.790.000,00 14.348 2.703,51 barang (PHLN,COREMAP, 052) Cofunding Dari BP Pusat Jakarta 512 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302019653 14-Dec-2021 1416/IPK.2.03/LK/V/2019, PT. Wahana CiptA 180.142.500 100% 180.142.500,00 14.348 12.555,23 berupa pembayaran pemeliha raan atas Pekerjaan tgl 10 mei 2019 Bangunwisma Pengadaan jasa konsultansi Manajemen Konstruski pembangunan Gedung Pusat Data Nasional Ekosistem pesisir, Laboratorium dan ruang kerja 513 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for 140 Khusus Pinjaman Bappenas 211401105001678 10-Dec-21 Mohamad Agung Widodo 13.487.120 100% 13.487.120,00 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II dan Hibah an Sdr Mohamad Agung Widodo 514 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Luar 140 Khusus Pinjaman Bappenas 211401105001687 13-Dec-21 Ita Wulandari 69.960.848 100% 69.960.848,00 14.348 4.876,00 Negeri COREMAP-CTI a.n Ita Wulandari dan Hibah 515 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105001703 14-Dec-21 Desak Made Pera Rosita 69.960.848 100% 69.960.848,00 14.348 4.876,00 Negeri Periode Jan - Mar 2022 Coremap-CTI a.n Desak dan Hibah Dewi Made Pera Rosita Dewi 516 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105001686 13-Dec-21 Restya Rahmaniar 69.960.848 100% 69.960.848,00 14.348 4.876,00 Negeri COREMAP-CTI a.n Restya Rahmaniar dan Hibah 517 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 LN 140 Khusus Pinjaman Bappenas 211401105001685 13-Dec-21 Meydar H Saleh 69.960.848 100% 69.960.848,00 14.348 4.876,00 COREMAP-CTI a.n Meydar H Saleh dan Hibah 518 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar 140 Khusus Pinjaman Bappenas 211401105001702 14-Dec-21 Alan Ray Farandy 69.960.848 100% 69.960.848,00 14.348 4.876,00 Negeri Periode Jan - Mar 2022 Coremap-CTI a.n Alan Ray dan Hibah Farandy 519 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for 140 Khusus Pinjaman Bappenas 211401105001679 10-Dec-21 Hary Christijanto 14.979.312 100% 14.979.312,00 14.348 1.044,00 Sustainable Fisheries Policy Professional Short Course II dan Hibah a.n Hary Christijanto 520 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303023417 16-Dec-2021 2514/PPK/IV/PK/KU/9/202 PT. DEXATAMA NIAGA 8.312.700.000 100% 8.312.700.000 14.337 579.807,49 berupa pengadaan belanja modal peralatan dan mesin 1 Tanggal 7 September LABTEKINDO berupa peralatan riset oseanografi 2021 521 Component 2 Pembayaran belanja modal (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303023458 16-Dec-2021 Kwitansi Nomor 100- PT. TRIASIH CIPTA JAYA 23.000.000 100% 23.000.000,00 14.343 1.603,57 berupa pengadaan scanner dan infokus portable KW/TCJ/XII/2021 tanggal 16 Desember 2021 522 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301025250 16-Dec-2021 Bendahara Pengeluaran 84.056.000 100% 84.056.000,00 14.343 5.860,42 berupa perjalanan dinas Survei dan Pengukuran Lapangan Kuantitas & Kualitas Perairan di DAS & pesisir konawe sulawesi tenggara (apip) dan Jogjakarta (Tri H) 523 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302020006 17-Dec-2021 Kwitansi No CV. Almira Karabela 34.063.000 100% 34.063.000,00 14.343 2.374,89 berupa peengadaan bahan kegiatan uji kompetensi 38/K/AK/X/2021 tanggal skema mangrove di TUK Fakultas pertanian Universitas 19 Oktober 2021 Trunojoyo Madura 524 Component 3 Pembayaran belanja barang (PHLN,COREMAP,053) 088 Jakarta III LIPI 210881302019983 16-Dec-2021 kwitansi Nomor 110/K/CV- CV. Pancuran Emas Jaya 48.068.500 100% 48.068.500,00 14.343 3.351,36 berupa pembayaran Pengadaan Perlengakapan PEJ/XII/2021 Tanggal 16 Lapangan untuk Tim Teknis Desember 2021 525 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303024005 21-Dec-2021 SPK Nomor PT ESCO UTAMA 4.383.000.000 100% 4.383.000.000 14.349 305.456,83 berupa Pengadaan belanja modal peralatan dan mesin 4331/PPK/IV/PK/KU/12/20 berupa alat Fume Hood, 21 Tanggal 9 Desember 2021 526 Component 1 Pertanggungjawaban Tambahan Uang Persediaan Ke 6 P 140 Khusus Pinjaman Bappenas 211401701000182 21-Dec-21 BPG 019 KEMENTERIAN PPN 962.751.012 100% 962.751.012 14.349 67.095,34 ada PPK 06.10 untuk Keperluan Belanja Barang Non Oper dan Hibah /BAPPENAS asional Lainnya 527 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303024136 22-Dec-2021 SPK Nomor CV. MEDIA GLOBAL MANDIRI 144.814.000 100% 144.814.000 14.349 10.092,27 berupa pengadaan Pengolah Data dan Komunikasi 3551/PPK/IV/PK/KU/11/20 berupa Wifi, CCTV, dan Sound System Kedeputian 21 Tanggal 1 Nopember Bidang IPK LIPI 2021 Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 528 Component 1 pembayaran belanja modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303024072 22-Dec-2021 SPK Nomor CV. Wisata Karya 193.000.000 100% 193.000.000 14.349 13.450,42 berupa Pengadaan Furniture dan Kelengkapan Kantor 4202/PPK/IV/PK/KU/12/20 BBIL 21 Tanggal 1 Desember 2021, 529 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303024293 27-Dec-2021 2447/PPK/IV/PK/KU/9/202 PT KARYA MENTARI SERAYA 3.014.915.400 100% 3.014.915.400 14.219 212.034,28 berupa Pembayaran Termin II Pengadaan Belanja Modal 1 Tanggal 3 September Peralatan dan Mesin Berupa Interior Laboratorium 2021 Gedung Pusat Nasional Ekosistem Pesisir 530 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303024271 24-Dec-2021 2447/PPK/IV/PK/KU/9/202 PT KARYA MENTARI SERAYA 3.014.915.401 100% 3.014.915.401 14.219 212.034,28 berupa Pembayaran Termin III Pengadaan Belanja Modal 1 Tanggal 3 September Peralatan dan Mesin Berupa Interior Laboratorium 2021 Gedung Pusat Nasional Ekosistem Pesisir 531 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303024308 27-Dec-2021 2447/PPK/IV/PK/KU/9/202 PT KARYA MENTARI SERAYA 4.019.887.201 100% 4.019.887.201 14.225 282.593,12 berupa Pembayaran Termin I Pengadaan Belanja Modal 1 Tanggal 3 September Peralatan dan Mesin Berupa Interior Laboratorium 2021 Gedung Pusat Nasional Ekosistem Pesisir 532 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881303024296 27-Dec-2021 3468/PPK/IV/PK/KU/10/20 CV. Cipta Karya Perdana 126.815.000 100% 126.815.000 14.225 8.914,94 berupa pengadaan bahan penelitiam bioassesment 21 Tanggal 27 Oktober terhadap pencemaran logam berat Pb dan Cd pada 2021 sedimen dan air di teluk jakarta, 533 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) 088 Jakarta III LIPI 210881301025608 27-Dec-2021 1991/PPK/IV/PK/KU/7/202 CV. Moealim Noer 110.518.000 100% 110.518.000 14.225 7.769,28 berupa pengadaan bahan penelitian analisis risiko 1 Tanggal 30 Juli 2021 ekologi merkuri pada penambang emas skala kecil terhadap ekosistem pesisir 534 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881303024303 27-Dec-2021 2598/PPK/IV/PK/KU/9/202 PT. Trias Nathomi Chemindo 104.053.000 100% 104.053.000 14.225 7.314,80 berupa pekerjaan kalibrasi water furification Genetika, 1 Tanggal 10 September 2021 535 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 088 Jakarta III LIPI 210881302020444 27-Dec-2021 2570/PPK/IV/PK/KU/9/202 PT. Medquest jaya Global 96.988.182 100% 96.988.182,00 14.225 6.818,15 berupa e purchasing pengadaan belanja modal peralatan 1 Tanggal 3 September mesin berupa Elisa Washer 2021 536 Component 2 Penggantiap UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881701027365 28-Dec-2021 Bendahara Pengeluaran 49.978.000 100% 49.978.000,00 14.237 3.510,43 (PHLN,COREMAP,052) dari BPP.2 Cibinong, 537 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881701027366 28-Dec-2021 Bendahara Pengeluaran 18.660.000 100% 18.660.000,00 14.237 1.310,67 (PHLN,COREMAP,052) cofunding dari BPP.4 Mataram 538 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881701027427 28-Dec-2021 Bendahara Pengeluaran 42.153.500 100% 42.153.500,00 14.237 2.960,84 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta 539 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881701027428 28-Dec-2021 Bendahara Pengeluaran 49.932.000 100% 49.932.000,00 14.237 3.507,20 (PHLN,COREMAP,052) dari BPP.3 Bandung 540 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881701027364 28-Dec-2021 Bendahara Pengeluaran 25.712.215 100% 25.712.215,00 14.237 1.806,01 (PHLN,COREMAP,052) dari BPP.1 Ambon 541 Component 1 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881701027368 28-Dec-2021 Bendahara Pengeluaran 17.365.800 100% 17.365.800,00 14.237 1.219,76 (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta 542 Component 2 Penggantian UP untuk keperluan belanja barang 088 Jakarta III LIPI 210881701027367 28-Dec-2021 Bendahara Pengeluaran 9.632.500 100% 9.632.500,00 14.237 676,58 (PHLN,COREMAP,052) dari BPP.4 Mataram 543 Component 1 Pertanggungjawaban Tambahan Uang Persediaan Ke 6 P 140 Khusus Pinjaman Bappenas 211401701000207 29-Dec-2021 Bendahara Pengeluaran 937.268.219 100% 937.268.219,00 14.265 65.704,05 ada PPK 06.10 untuk Keperluan Belanja Barang Non Oper dan Hibah asional Lainnya 544 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701028249 29-Dec-2021 Bendahara Pengeluaran 24.697.299 100% 24.697.299,00 14.265 1.731,32 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta 545 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701028456 30-Dec-2021 Bendahara Pengeluaran 269.721.512 100% 269.721.512,00 14.265 18.907,92 barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong 546 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701028250 29-Dec-2021 Bendahara Pengeluaran 322.649.900 100% 322.649.900,00 14.265 22.618,29 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 547 Component 3 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027964 29-Dec-2021 Bendahara Pengeluaran 424.000 100% 424.000,00 14.265 29,72 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 548 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027969 29-Dec-2021 Bendahara Pengeluaran 42.621.051 100% 42.621.051,00 14.265 2.987,81 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 549 Component 2 Pertangggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027961 29-Dec-2021 Bendahara Pengeluaran 32.850.918 100% 32.850.918,00 14.265 2.302,90 Barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 550 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027963 29-Dec-2021 Bendahara Pengeluaran 16.307.570 100% 16.307.570,00 14.265 1.143,19 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 551 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027965 29-Dec-2021 Bendahara Pengeluaran 21.449.818 100% 21.449.818,00 14.265 1.503,67 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 552 Component 2 Pertanggungjawabann TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027962 29-Dec-2021 Bendahara Pengeluaran 12.921.000 100% 12.921.000,00 14.265 905,78 barang (PHLN,COREMAP, 052) Cofunding dari BPP.3 Bandung 553 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027966 29-Dec-2021 Bendahara Pengeluaran 2.050.000 100% 2.050.000,00 14.265 143,71 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram Item Office Cross-Ref Date of Contract Supplier/ Contract Total Amount WB Amount of Exchange Amount DISBURSEMENT CATEGORY No. Cat No. Issuing SP2D No. Contractor Value Paid to Contractor Financing WB portion Rate Charged (SP2D) Description SP2D No. and Date Name (incl. Add) (GOI+IBRD+PPN) % paid Applied to SA (IDR) (IDR) (USD eqv) 554 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027967 29-Dec-2021 Bendahara Pengeluaran 13.340.000 100% 13.340.000,00 14.265 935,16 barang (PHLN,COREMAP, 052) dari BPP.4 mataram 555 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701027968 29-Dec-2021 Bendahara Pengeluaran 16.803.796 100% 16.803.796,00 14.265 1.177,97 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 556 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701028506 30-Dec-2021 Bendahara Pengeluaran 107.350.900 100% 107.350.900 14.269 7.523,37 modal (PHLN,COREMAP, 051) dari BP Pusat Jakarta 557 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701028476 30-Dec-2021 Bendahara Pengeluaran 43.691.137 100% 43.691.137 14.269 3.061,96 barang (PHLN,COREMAP, 052) cofunding dari BP Pusat Jakarta 558 Component 1 Penggantian uang persediaan untuk keperluan belanja 088 Jakarta III LIPI 210881701028478 30-Dec-2021 Bendahara Pengeluaran 18.482.500 100% 18.482.500 14.269 1.295,29 barang (PHLN, COREMAP,051) dari BP Pusat Jakarta 559 Component 3 Penggantian Uang Persediaan untuk keperluan belanja 088 Jakarta III LIPI 210881701028477 30-Dec-2021 Bendahara Pengeluaran 64.293.767 100% 64.293.767 14.269 4.505,84 barang (PHLN, COREMAP,053) dari BP Pusat Jakart 560 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701028495 30-Dec-2021 Bendahara Pengeluaran 60.602.392 100% 60.602.392,00 14.269 4.247,14 barang (PHLN, COREMAP,052) dari BPP.1 Ambon 561 Component 2 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701029683 3-Jan-2022 Bendahara Pengeluaran 94.984.000 100% 94.984.000 14.278 6.652,47 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta 562 Component 1 Pertanggungjawaban TUP untuk keperluan belanja 088 Jakarta III LIPI 210881701029685 3-Jan-2022 Bendahara Pengeluaran 378.357.834 100% 378.357.834 14.278 26.499,36 barang (PHLn,COREMAP, 051) dari BP Pusat Jakarta 563 Component 3 Pertanggungjawaban TUP untuk keperluan belanjan 088 Jakarta III LIPI 210881701029684 3-Jan-2022 Bendahara Pengeluaran 3.838.000 100% 3.838.000 14.278 268,81 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta TOTAL EXPENDITURES 102.330.329.461,04 102.330.329.461,04 14.294 7.158.828,60 LAMPIRAN II Statement of Expenditures BY COMPONENT for those NOT Subject to Prior Review for the Reporting Period of Jan 01 to Dec 31, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105000157 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Rizkie Satriya Utama 2 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000154 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Kristina Setiani 3 Component 1 Pemb. Tunjangan Biaya Hidup dll Program S3 Periode Feb Bappenas 211401105000155 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Fawzan Bhakti Soffa 4 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000161 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Samuel Radityo Adiprabowo 5 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000163 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Muhammad H Ghifari 6 Component 1 Pemb Bench Fees Fall 2020 - Spring 2021 dll Diklat S2 Bappenas 211401105000158 29 Januari 2021 350.434.000,00 100% 350.434.000,00 14.000 25.031,00 Luar Negeri Coremap-CTI utk Alan Ray Farandy dkk 5 Org an University of Rhode Island 7 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000162 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Fauzan Hidayat 8 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000164 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Joyke Fredy Bastian Rumajar 9 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105000156 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n FNU Hariono 10 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S3 Bappenas 211401105000153 29 Januari 2021 45.654.000,00 100% 45.654.000,00 14.000 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Diky Suganda 11 Component 1 Pemb. Bench Fees Spring - Fall 2021 dll Diklat S2, S3 Luar Bappenas 211401105000204 09 Februari 2021 630.434.000,00 100% 630.434.000,00 14.000 45.031,00 Negeri COREMAP-CTI utk Fauzan Hidayat dkk 9 Org an University of Rhode Island 12 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105000205 09 Februari 2021 28.770.000,00 100% 28.770.000,00 14.000 2.055,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri 13 Component 1 Pembayaran International Travel Program Diklat S2 Luar Bappenas 211401302000001 09 Februari 2021 41.338.080,00 100% 41.338.080,00 14.000 2.952,72 Negeri Coremap-CTI utk Lutfi Felanie, dkk 3 orang a.n PT. Jendela Dunia Wisata 14 Component 1 Pem Tunj Keberangkatan dan Transfer Fee Program S2 LN Bappenas 211401105000206 10 Februari 2021 46.203.750,00 100% 46.203.750,00 13.875 3.330,00 Per Tahun 2021 Pend dan Pel Diklat Gelar LN COREMAP- CTI a.n Alan Ray Farandy 15 Component 1 Pemb. International Travel Program S2 Diklat Gelar Luar Bappenas 211401302000005 11 Februari 2021 33.582.772,50 100% 33.582.772,50 13.875 2.420,38 Negeri Coremap-CTI utk Desak Made Pera Rosita Dewi an PT. Jendela Dunia Wisata 16 Component 1 Pembayaran International Travel Program S2 Diklat Gelar Bappenas 211401302000002 11 Februari 2021 33.582.772,50 100% 33.582.772,50 13.875 2.420,38 Luar Negeri Coremap-CTI untuk Alan Ray Farandy a.n PT. Jendela Dunia Wisata 17 Component 1 Pemb International travel Prog S2 LN Pend dan Pel Diklat Bappenas 211401302000006 11 Februari 2021 32.343.318,75 100% 32.343.318,75 13.875 2.331,05 Gelar LN CoremapCTI utk Ita Wulandari a.n PT. Jendela Dunia Wisata 1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 Component 1 Pemb International travel Prog S2 LN Pend dan Pel Diklat Bappenas 211401302000004 11 Februari 2021 33.582.772,50 100% 33.582.772,50 13.875 2.420,38 Gelar LN CoremapCTI utk Meydar Hapsary Saleh a.n PT. Jendela Dunia Wisata 19 Component 1 Pem Tunj Keberangkatan dan Transfer Fee Program S2 LN Bappenas 211401105000291 26 Februari 2021 47.619.000,00 100% 47.619.000,00 14.300 3.330,00 Per Tahun 2021 Pend dan Pel Diklat Gelar LN COREMAP- CTI a.n Meydar H Saleh 20 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105000292 26 Februari 2021 29.386.500,00 100% 29.386.500,00 14.300 2.055,00 Negeri Periode Feb - Mar 2021 COREMAP-CTI a.n Desak Made Pera Rosita Dewi 22 Component 1 Pemb Tunj Keberangkatan dan Transfer Fee Program S2 Bappenas 211401105000293 26 Februari 2021 47.619.000,00 100% 47.619.000,00 14.300 3.330,00 LN Periode Tahun 2021 Diklat Gelar LN COREMAP-CTI a.n Desak Made Pera Rosita Dewi 23 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105000294 26 Februari 2021 29.386.500,00 100% 29.386.500,00 14.300 2.055,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Meydar H Saleh 24 Component 1 Pemb Tunj Keberangkatan dll Prog S2 LN Periode Th 2021 Bappenas 211401105000325 5 Maret 2021 49.407.498,00 100% 49.407.498,00 14.371 3.438,00 Pend dan Pel Diklat Gelar LN COREMAP-CTI a.n Ita Wulandari 25 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Feb-Maret Bappenas 211401105000324 5 Maret 2021 17.044.006,00 100% 17.044.006,00 14.371 1.186,00 2021 Pend dan Pel Diklat Gelar LN COREMAP-CTI a.n ita Wulandari 26 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN Bappenas 211401105000339 9 Maret 2021 17.159.048,00 100% 17.159.048,00 14.468 1.186,00 Periode Feb-Maret 2021 Diklat Gelar LN COREMAP-CTI a.n Restya Rahmaniar 27 Component 1 Pemb Tunjangan Keberangkatan dan Transfer Fee Bappenas 211401105000342 15 Maret 2021 48.732.840,00 100% 48.732.840,00 14.418 3.380,00 Program S2 LN Periode Tahun 2021 Diklat Gelar LN COREMAP-CTI a.n Restya Rahmaniar 28 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar Negeri Bappenas 211401105000374 18 Maret 2021 235.131.780,00 100% 235.131.780,00 14.412 16.315,00 Coremap-CTI untuk Karyasiswa Restya Rahmaniar an University of Rhode Island 30 Component 1 Pemb Tuition Fee Spring 2021 dll Program S2 Luar Negeri Bappenas 211401105000362 18 Maret 2021 210.011.664,00 100% 210.011.664,00 14.412 14.572,00 Coremap-CTI Karyasiswa Samuel Radityo Adiprabowo an University of Rhode Island 31 Component 1 Pemb. TF Spring 2021 dll Program S2 Luar Negeri Bappenas 211401105000377 18 Maret 2021 236.155.032,00 100% 236.155.032,00 14.412 16.386,00 Coremap-CTI Karyasiswa Desak Made Pera Rosita Dewi a.n University of Rhode Island 32 Component 1 Pemb TF Spring 2021 dll Prog S2 Diklat Gelar LN Coremap- Bappenas 211401105000373 18 Maret 2021 235.362.372,00 100% 235.362.372,00 14.412 16.331,00 CTI Utk Karyasiswa Alan Ray Farandi a.n Univ of Rhode 33 Island Tuition Fee Spring 2020 dll Program S2 Luar Negeri Component 1 Pemb. Bappenas 211401105000353 18 Maret 2021 211.885.224,00 100% 211.885.224,00 14.412 14.702,00 Coremap-CTI Karyasiswa Kristina Resmi Setiani a.n University of Rhode Island 34 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN Bappenas 211401105000376 18 Maret 2021 212.966.124,00 100% 212.966.124,00 14.412 14.777,00 Coremap-CTI utk Karyasiswa Muhammad Hafizh Ghifari. a.n University of Rhode Island 35 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar Negeri Bappenas 211401105000361 18 Maret 2021 210.011.664,00 100% 210.011.664,00 14.412 14.572,00 Coremap-CTI Karyasiswa Rizkie Satriya Utama a.n University of Rhode Island 36 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar Negeri Bappenas 211401105000379 18 Maret 2021 235.362.372,00 100% 235.362.372,00 14.412 16.331,00 Coremap-CTI Karyasiswa Meydar Hapsari Saleh a.n University of Rhode Island 37 Component 1 Pembayaran TF Spring 2021 dll Prog S2 LN Diklat Gelar LN Bappenas 211401105000354 18 Maret 2021 211.885.224,00 100% 211.885.224,00 14.412 14.702,00 Coremap-CTI utk Karyasiswa Fauzan Hidayat. a.n University of Rhode Island 1 2 3 4 5 6 7 8 9 10 11 12 13 14 38 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar Negeri Bappenas 211401105000363 18 Maret 2021 210.011.664,00 100% 210.011.664,00 14.412 14.572,00 Coremap-CTI Karyasiswa Fawzan Bhakti Soffa a.n University of Rhode Island 39 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN Bappenas 211401105000378 18 Maret 2021 236.947.692,00 100% 236.947.692,00 14.412 16.441,00 Coremap-CTI utk Karyasiswa Ita Wulandari a.n Univ of Rhode Island 40 Component 1 Pemb. Tuition Fee Spring 2021 dll S2 Luar Negeri Bappenas 211401105000352 18 Maret 2021 211.885.224,00 100% 211.885.224,00 14.412 14.702,00 Coremap-CTI Karyasiswa Joyke Fredy Bastian Rumajar a.n University of Rhode Island 41 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN Bappenas 211401105000375 18 Maret 2021 162.163.824,00 100% 162.163.824,00 14.412 11.252,00 Coremap-CTI utk Karyasiswa Hariono Hariono. a.n University of Rhode Island 42 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN Bappenas 211401105000484 06 April 2021 70.862.956,76 100% 70.862.956,76 14.533 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Fauzan Hidayat 43 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN April - Bappenas 211401105000485 06 April 2021 70.862.956,76 100% 70.862.956,76 14.533 4.876,00 Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Joyke Fredy Bastian Rumajar 44 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN Bappenas 211401105000483 06 April 2021 70.862.956,76 100% 70.862.956,76 14.533 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n FNU Hariono 45 Component 1 Pembayaran Tunjangan Biaya Hidup dll Prog S2 LN Bappenas 211401105000509 08 April 2021 66.600.157,00 100% 66.600.157,00 14.513 4.589,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Kristina Setiani 46 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105000496 06 April 2021 70.765.388,00 100% 70.765.388,00 14.513 4.876,00 Negeri Periode Apr - Jun 2021 COREMAP-CTI a.n Samuel Radityo Adiprabowo 47 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN Bappenas 211401105000512 08 April 2021 70.765.388,00 100% 70.765.388,00 14.513 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Alan Ray Farandy 48 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Apr-Jun Bappenas 211401105000511 08 April 2021 70.765.388,00 100% 70.765.388,00 14.513 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Muhammad H Ghifari 49 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN Bappenas 211401105000497 06 April 2021 70.765.388,00 100% 70.765.388,00 14.513 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Fawzan Bhakti Soffa 50 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN Bappenas 211401105000513 08 April 2021 70.765.388,00 100% 70.765.388,00 14.513 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Meydar H Saleh 51 Component 1 Pembayaran Tunjangan Biaya Hidup dll Periode Apr - Jun Bappenas 211401105000510 08 April 2021 70.765.388,00 100% 70.765.388,00 14.513 4.876,00 2021 Program S2 Luar Negeri COREMAP-CTI a.n Rizkie Satriya Utama 52 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LNPeriode Apr-Jun Bappenas 211401105000514 09 April 2021 71.350.508,00 100% 71.350.508,00 14.633 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Desak Made Pera Rosita Dewi 53 Component 1 Pembayaran Tunj Biaya Hidup Dll Program S2 LN Periode Bappenas 211401105000538 13 April 2021 71.350.508,00 100% 71.350.508,00 14.633 4.876,00 Apr-Jun 2021 Diklat Gelar LN COREMAP-CTI a.n Restya Rahmaniar 54 Component 1 Pembayaran Tunjangan Biaya Hidup dll Prog S2 LN Bappenas 211401105000539 13 April 2021 71.350.508,00 100% 71.350.508,00 14.633 4.876,00 Periode Apr-Jun 2021 Gelar LN COREMAP-CTI a.n Ita Wulandari 1 2 3 4 5 6 7 8 9 10 11 12 13 14 55 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 Bappenas 211401105000893 24 June 2021 70.477.704,00 100% 70.477.704,00 14.454 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Fauzan Hidayat 56 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 Bappenas 211401105000892 24 June 2021 70.477.704,00 100% 70.477.704,00 14.454 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Kristina Setiani 57 Component 1 Pemb. International Travel Program S3 Diklat Gelar Luar Bappenas 211401302000208 23 June 2021 17.359.832,16 100% 17.359.832,16 14.454 1.201,04 Negeri Coremap-CTI Karyasiswa Diky Suganda a.n PT.Jendela Dunia Wisata 58 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S3 Bappenas 211401105000900 25 June 2021 51.867.648,00 100% 51.867.648,00 14.472 3.584,00 Periode Apr - Jun 2021 Diklat Gelar Luar Negeri Coremap- CTI a.n Diky Suganda 59 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 Bappenas 211401105000894 25 June 2021 70.565.472,00 100% 70.565.472,00 14.472 4.876,00 LN Pend dan Pel COREMAP-CTI a.n Joyke Fredy Bastian Rumajar 60 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Juli-Sept Bappenas 211401105000902 28 June 2021 70.565.472,00 100% 70.565.472,00 14.472 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Samuel Radityo Adiprabowo 61 Component 1 Pemb Tunj Biaya Hidup periode Juli-Sep 2021 dll Prog S2 Bappenas 211401105000884 24 June 2021 70.565.472,00 100% 70.565.472,00 14.472 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n FNU 62 Hariono Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 Bappenas 211401105000885 24 June 2021 70.565.472,00 100% 70.565.472,00 14.472 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Rizkie Satriya Utama 63 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Juli-Sept Bappenas 211401105000903 28 June 2021 70.565.472,00 100% 70.565.472,00 14.472 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Fawzan Bhakti Soffa 64 Component 1 Pemb Tunj Biaya Hidup dll Program S2 LN Periode Juli- Bappenas 211401105000908 30/06/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 Sept 2021 Diklat LN COREMAP-CTI a.n Restya Rahmaniar 65 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Juli-Sept 2021 Pendidikan dan Pelatihan LN COREMAP-CTI a.n Desak Bappenas 211401105000920 01/07/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 Made Pera Rosita Dewi 66 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Periode Jul - Sep 2021 Diklat Gelar Luar Negeri Coremap- Bappenas 211401105000934 02/07/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 CTI an Alan Ray Farandy 67 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Periode Jul - Sep 2021 Diklat Gelar Luar Negeri Coremap- Bappenas 211401105000909 30/06/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 CTI an Meydar H Saleh 68 Component 1 Pemb International travel Prog S2 LN Pendidikan dan Pelatihan Coremap-CTI PT Jendela Dunia Wisata a.n Bappenas 211401105000907 30/06/2021 70.614.232,00 100% 70.614.232,00 14.482 4.876,00 Muhammad H Ghifari 69 Component 1 Pemb International travel Prog S2 LN Pendidikan dan 1.631,97 Pelatihan Coremap-CTI PT Jendela Dunia Wisata a.n Bappenas 211401302000284 04/08/2021 23.405.713,74 100% 23.405.713,74 14.342 Muhammad H Ghifari 70 Component 1 Pemb Tunjangan Biaya Hidup Program S2 LN Periode Juli 210,71 2021 Diklat Gelar LN COREMAP-CTI a.n Muhammad Bappenas 211401304000198 09/09/2021 3.007.234,00 100% 3.007.234,00 14.272 Hafizh Ghifari 71 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001389 13-Okt-21 Boma Kresning 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course Coremap-CTI an Sdr Boma Kresning 72 Component 1 Pemb. Tunjangan Biaya Hidup dll Program Diklat S2 Luar Bappenas 211401105001321 01-Okt-21 Samuel Radityo Adiprabowo 69.068.540,00 100% 69.068.540 14.165 4.876,00 Negeri Periode Okt - Des 2021 COREMAP-CTI a.n Samuel Radityo Adiprabowo 1 2 3 4 5 6 7 8 9 10 11 12 13 14 73 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001351 06-Okt-21 Restya Rahmaniar 69.068.540,00 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Restya Rahmaniar 74 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan University Bappenas 211401105001404 14-Okt-21 Hary Christijanto 65.031.515 100% 65.031.515 14.165 4.591,00 of Rhode Island Tahap I LN COREMAP-CTI a.n Hary Christijanto 75 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001348 06-Okt-21 Fauzan Hidayat 69.068.540 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Fauzan Hidayat 76 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105001331 04-Okt-21 Meydar H Saleh 69.068.540,00 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri Coremap- CTI an Meydar H Saleh 77 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001352 06-Okt-21 Ita Wulandari 73.488.020,00 100% 73.488.020 14.165 5.188,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Ita Wulandari 78 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001406 14-Okt-21 Selvia Oktaviyani 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course Coremap-CTI a.n Ibu Selvia Oktaviyani 79 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001391 13-Okt-21 Ali Muharam 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course Coremap-CTI an Sdr Ali Muharam 80 Component 1 Pemb. Biaya Hidup dll The Science for Sustainable Bappenas 211401105001393 13-Okt-21 Februanty Suyatiningsih Purnomo 58.388.130,00 100% 58.388.130 14.165 4.122,00 Fisheries Policy Professional Short Course Coremap-CTI a.n Februanty Suyatiningsih Purnomo 81 Component 1 Pemb. Tunjangan Biaya Hidup dll Program S2 Periode Okt Bappenas 211401105001318 01-Okt-21 Fawzan Bhakti Soffa 69.068.540,00 100% 69.068.540 14.165 4.876,00 - Des 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Fawzan Bhakti Soffa 82 Component 1 Pemb Tunj Biaya Hidup dll periode Okt-Des 2021 Prog S2 Bappenas 211401105001350 06-Okt-21 Joyke Fredy Bastian Rumajar 69.068.540 100% 69.068.540 14.165 4.876,00 Diklat Gelar LN COREMAP-CTI a.n Joyke Fredy Bastian Rumajar 83 Component 1 Pembayaran Biaya Hidup dll Prog Pelatihan University of Bappenas 211401105001403 14-Okt-21 Lelly Hasni Pertamawati 58.388.130 100% 58.388.130 14.165 4.122,00 Rhode Island Tahap I LN COREMAP-CTI a.n Ibu Lelly Hasni Pertamawati 84 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001402 14-Okt-21 Setyawati 58.388.130,00 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course Coremap-CTI an Setyawati 85 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan University Bappenas 211401105001394 13-Okt-21 Mochamad Idnillah 58.388.130,00 100% 58.388.130 14.165 4.122,00 of Rhode Island Tahap I LN COREMAP-CTI a.n Bpk Mochamad Idnillah 86 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105001319 01-Okt-21 Hariono 69.068.540 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n FNU Hariono 87 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan University Bappenas 211401105001405 14-Okt-21 Angga Nugraha 58.388.130 100% 58.388.130 14.165 4.122,00 of Rhode Island Tahap I LN COREMAP-CTI a.n Angga Nugraha 88 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan University Bappenas 211401105001396 13-Okt-21 Augy Syahailatua 65.031.515,00 100% 65.031.515 14.165 4.591,00 of Rhode Island Tahap I LN COREMAP-CTI a.n Augy Syahailatua 89 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001320 01-Okt-21 Kristina Setiani 69.068.540,00 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Kristina Setiani 90 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105001330 04-Okt-21 Alan Ray Farandy 69.068.540 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri Coremap- CTI an Alan Ray Farandy 1 2 3 4 5 6 7 8 9 10 11 12 13 14 91 Component 1 Pemb Biaya Hidup dll Program Pelatihan University of Bappenas 211401105001392 13-Okt-21 Mochammad Rachadian Prayoga 58.388.130 100% 58.388.130 14.165 4.122,00 Rhode Island Tahap I LN COREMAP-CTI a.n Mochammad Rachadian Prayoga 92 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan University Bappenas 211401105001390 13-Okt-21 Mohamad Agung Widodo 58.388.130,00 100% 58.388.130 14.165 4.122,00 of Rhode Island Tahap I LN COREMAP-CTI a.n Mohamad Agung Widodo 93 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan University Bappenas 211401105001395 13-Okt-21 Yesi Dewita Sari 58.388.130,00 100% 58.388.130 14.165 4.122,00 of Rhode Island Tahap I LN COREMAP-CTI a.n Yesi Dewita Sari 94 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001349 06-Okt-21 Rizkie Satriya Utama 69.068.540 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Rizkie Satriya Utama 95 Component 1 Pemb Tunjangan Biaya Hidup dll Program S2 Periode Okt - Bappenas 211401105001323 04-Okt-21 Desak Made Pera Rosita Dewi 69.068.540,00 100% 69.068.540 14.165 4.876,00 Des 2021 Diklat Luar Negeri Coremap-CTI an Desak Made Pera Rosita Dewi 96 Component 1 Pembayaran Sekaligus Paket Kegiatan Pelatihan Nasional Bappenas 211401304000276 02-Nov-21 PT GRAHAWITA CENDEKIA 146.221.000,00 100% 146.221.000,00 14.261 10.253,21 Perencanaan Ruang Laut Tingkat Dasar Program Coremap-CTI Tahun 2021 97 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000292 03-Nov-21 Supriyadi Saleh 2.605.000,00 100% 2.605.000,00 14.261 182,67 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n Supriyadi Saleh 98 Component 1 Pemb. Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000461 02-Nov-21 Decky Thao 4.015.027,00 100% 4.015.027,00 14.261 281,54 Perencanaan Ruang Laut Tingkat Dasar Tahun 2021 Diklat Coremap-CTI an Decky Thao 99 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000291 03-Nov-21 Risnadi 2.535.000,00 100% 2.535.000,00 14.261 177,76 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n Risnadi 100 Component 1 Penggantian Uang Persediaan Ke- 18 Pada PPK 06.10 Bappenas 211401303000452 01-Nov-21 Bendahara Pengeluaran 21.350.000,00 100% 21.350.000,00 14.261 1.497,09 untuk Keperluan Belanja Belanja Barang Non Operasional Lainnya 101 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000290 03-Nov-21 Ahmad Rayhan Kamil 2.560.000,00 100% 2.560.000,00 14.261 179,51 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n Ahmad Rayhan Kamil 102 Component 1 Pemb Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000301 04-Nov-21 Teni Nawalusi Ir 2.605.000,00 100% 2.605.000,00 14.301 182,16 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Diklat Coremap-CTI an Teni Nawalusi Ir 103 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000299 04-Nov-21 Untung Ismoyo 2.605.000,00 100% 2.605.000,00 14.301 182,16 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n Untung Ismoyo 104 Component 1 Pemb Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000300 04-Nov-21 Annis Sholiha 2.605.000,00 100% 2.605.000,00 14.301 182,16 Perencanaan Ruang Laut Tingkat Dasar Tahun 2021 Diklat Coremap-CTI an Annis Sholihat 105 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000500 05-Nov-21 Waty Darmawaty 2.605.000,00 100% 2.605.000,00 14.327 181,82 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Waty Darmawaty 106 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000499 05-Nov-21 Indah Damayanti 2.605.000,00 100% 2.605.000,00 14.327 181,82 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Sdri Indah Damayanti 107 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401302000522 08-Nov-21 Suci Alisafira 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI an Suci Alisafira 108 Component 1 Penggantian Uang Persediaan Ke-19 Pada Bappenas 211401303000503 08-Nov-21 Bendahara Pengeluaran 59.552.299,00 100% 59.552.299,00 14.268 4.173,84 PPK 06.10 untuk Keperluan Belanja Barang Non Operasio nal Lainnya 1 2 3 4 5 6 7 8 9 10 11 12 13 14 109 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401302000523 08-Nov-21 Dhian Widiyani 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI an Dhian Widiyani 110 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000501 05-Nov-21 Anindya Arma Risanti 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Anindya Arma Risanti 111 Component 1 Pembayaran Fasilitator Pelatihan dll Pelatihan Nasional Bappenas 211401304000321 09-Nov-21 Dinah Yunitawati 2.555.000 100% 2.555.000,00 14.268 179,07 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Dinah Yunitawati 112 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000502 05-Nov-21 Irfan Thofiq Firdaus 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Irfan Thofiq Firdaus 113 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401302000536 08-Nov-21 Eka Yudhistira S.Pi,MM 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI an Eka Yudhistira S.Pi,MM 114 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401302000521 08-Nov-21 Elmy Yasinta Ciptadi 2.605.000,00 100% 2.605.000,00 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI an Elmy Yasinta Ciptadi 115 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Pelatnas Bappenas 211401302000524 08-Nov-21 R Arief Budikusuma 2.605.000,00 100% 2.605.000,00 14.268 182,58 Tahun 2021 Diklat COREMAP-CTI utk Karyasiswa a.n R Arief Budikusuma 116 Component 1 Pembayaran International travel Program Coremap-CTI Bappenas 211401302000548 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.243 1.652,56 Karyasiswa Lelly Hasni Pertamawati a.n PT. Jendela Dunia Wisata 117 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional Bappenas 211401304000328 11-Nov-21 Arief Sudianto 2.555.000,00 100% 2.555.000,00 14.243 179,39 Tahun 2021 Diklat COREMAP-CTI a.n Arief Sudianto 118 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional Bappenas 211401301000194 11-Nov-21 Arief Widianto 3.155.000,00 100% 3.155.000,00 14.243 221,51 Tahun 2021 Diklat COREMAP-CTI a.n Arief Widianto 119 Component 1 Pembayaran International travel Program Coremap-CTI Bappenas 211401302000547 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.243 1.652,56 Karyasiswa Februanty Suyatiningsih a.n PT. Jendela Dunia Wisata 120 Component 1 Pembayaran International travel Program Coremap-CTI Bappenas 211401302000546 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.243 1.652,56 Karyasiswa Selvia Octaviani a.n PT. Jendela Dunia Wisata 121 Component 1 Pembayaran International travel Program Coremap-CTI Bappenas 211401302000549 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.243 1.652,56 Karyasiswa Moh Agung Widodo a.n PT. Jendela Dunia Wisata 122 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Pelatnas Bappenas 211401304000327 11-Nov-21 Ifan Setiawan 2.605.000,00 100% 2.605.000,00 14.243 182,90 Tahun 2021 Diklat COREMAP-CTI utk Karyasiswa a.n Ifan Setiawan 123 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional Bappenas 211401303000512 11-Nov-21 Lia Kusumawati 2.555.000 100% 2.555.000,00 14.243 179,39 Tahun 2021 Diklat COREMAP-CTI a.n Ibu Lia Kusumawati 124 Component 1 Pemb Tunjangan Pelatihan dll Pelatihan Nasional Bappenas 211401302000557 17-Nov-21 Risty Utami dkk (8 Orang) 25.118.746 100% 25.118.746,00 14.211 1.767,56 Perencanaan Ruang Laut Tingkat Menengah I Th 2021 Coremap-CTI an Risty Utami dkk (8 Orang) 125 Component 1 Pembayaran International Travel Program Diklat Luar Bappenas 211401302000556 17-Nov-21 PT. Jendela Dunia Wisata 23.537.473,00 100% 23.537.473,00 14.211 1.656,29 Negeri Coremap-CTI Karyasiswa Setyawati a.n PT. Jendela Dunia Wisata 126 Component 1 Pembayaran Tunjangan Biaya Hidup Prog Pelatnas Tahun Bappenas 211401302000551 15-Nov-21 Stevanus Bayu Mangkurat 2.110.000,00 100% 2.110.000,00 14.211 148,48 2021 Diklat COREMAP-CTI utk Karyasiswa a.n R. Stevanus Bayu Mangkurat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 127 Component 1 Pemb Tunj Pelatihan dll Pelatihan Nasional Perencanaan Bappenas 211401303000515 17-Nov-21 Kholqi Azam Rizaldi dkk 4 Orang 16.128.545,00 100% 16.128.545,00 14.211 1.134,93 Ruang Laut Tingkat Dasar Th 2021 Coremap-CTI an Sdr Kholqi Azam Rizaldi dkk 4 Orang 128 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Bappenas 211401303000514 15-Nov-21 Kemal Pramayuda 2.605.000,00 100% 2.605.000,00 14.211 183,31 Pelatihan Nasional Tahun 2021 Diklat COREMAP-CTI a.n Sdr Kemal Pramayuda 129 Component 1 Pemb Tunj Pelatihan dll Pelatihan Nasional Perencanaan Bappenas 211401301000200 17-Nov-21 Muhammad Danny Sianggaputra 2.110.000,00 100% 2.110.000,00 14.211 148,48 Ruang Laut Tingkat Dasar Th 2021 Coremap-CTI an Muhammad Danny Sianggaputra 130 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Tahun Bappenas 211401304000335 15-Nov-21 Lalu Deden Yuda Pratama 2.605.000,00 100% 2.605.000,00 14.211 183,31 2021 Diklat COREMAP-CTI a.n Lalu Deden Yuda Pratama 131 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401304000336 15-Nov-21 Donny Orlando W 2.605.000,00 100% 2.605.000,00 14.211 183,31 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Donny Orlando W 132 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Pelatnas Bappenas 211401304000332 15-Nov-21 Yusuf Arief Afandy 2.605.000,00 100% 2.605.000,00 14.211 183,31 Tahun 2021 Diklat COREMAP-CTI utk Karyasiswa a.n Yusuf Arief Afandy 133 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Tahun Bappenas 211401304000333 15-Nov-21 Irvan Muhammad, dkk (2 Orang) 5.210.000,00 100% 5.210.000,00 14.211 366,62 2021 Diklat COREMAP-CTI a.n Irvan Muhammad, dkk (2 Orang) 134 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401304000334 15-Nov-21 Suryadi Fadillah 2.605.000,00 100% 2.605.000,00 14.211 183,31 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Suryadi Fadillah 135 Component 1 Penggantian Uang Persediaan Ke-20 Pada PPK 06.10 Bappenas 211401303000516 18-Nov-21 Bendahara Pengeluaran 78.343.442,00 100% 78.343.442,00 14.231 5.505,13 untuk Keperluan Belanja Barang Non Operasional Lainnya 136 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional PRL Tingkat Bappenas 211401303000523 19-Nov-21 Bpk M Mukhlis Kamal, Dkk (3 7.351.970,00 100% 7.351.970,00 14.231 516,62 Menengah II Th 2021 Coremap-CTI a.n Bpk M Mukhlis Orang) Kamal, Dkk (3 Orang) 137 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional Perencanaan Bappenas 211401304000342 19-Nov-21 Hatim Albasri SPI dkk 2 Orang 6.095.730,00 100% 6.095.730,00 14.231 428,34 Ruang Laut Tingkat Menengah II Th 2021 Coremap-CTI an Hatim Albasri SPI dkk 2 Orang 138 Component 1 Pembayaran Biaya Hidup dll Pelatihan Nasional PRL Bappenas 211401304000341 19-Nov-21 Yudi Wahyudin, S.PI, M.SI 10.860.000,00 100% 10.860.000,00 14.231 763,12 Tingkat Menengah Angkatan II Tahun 2021 Coremap-CTI a.n Yudi Wahyudin, S.PI, M.SI 139 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000340 19-Nov-21 Hendra Kusuma Wardana, dkk 2 5.155.000,00 100% 5.155.000,00 14.231 362,24 Nasional COREMAP-CTI a.n Hendra Kusuma Wardana, Org dkk 2 Org 140 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional PRL Tingkat Bappenas 211401302000566 22-Nov-21 Prof. Dr. Ir. Akhmad Fauzi M.Sc, 36.454.520,00 100% 36.454.520,00 14.255 2.557,31 Menengah II Th 2021 Coremap-CTI a.n Prof. Dr. Ir. dkk (4 Orang) Akhmad Fauzi M.Sc, dkk (4 Orang) 141 Component 1 Pembayaran International Travel Program Diklat Luar Bappenas 211401302000571 23-Nov-21 PT. Jendela Dunia Wisata 23.531.636,00 100% 23.531.636,00 14.255 1.650,76 Negeri Coremap-CTI Karyasiswa Mochamad Idnillah a.n PT. Jendela Dunia Wisata 142 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Bappenas 211401301000203 22-Nov-21 Danang Pramudita 2.855.000,00 100% 2.855.000,00 14.255 200,28 Pelatihan Nasional Menengah Angkatan II COREMAP-CTI a.n Danang Pramudita 1 2 3 4 5 6 7 8 9 10 11 12 13 14 143 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401301000202 22-Nov-21 Hadi Prayitno, dkk 2 Org 6.652.520,00 100% 6.652.520,00 14.255 466,68 Nasional COREMAP-CTI a.n Hadi Prayitno, dkk 2 Org 144 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000345 23-Nov-21 Tendy Kuhaja S.PI 2.412.000,00 100% 2.412.000,00 14.255 169,20 Nasional Menengah I COREMAP-CTI a.n Tendy Kuhaja S.PI 145 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000346 23-Nov-21 Giri Wilisandy 2.329.000,00 100% 2.329.000,00 14.255 163,38 Nasional PRL Tingkat Menengah I Tahun 2021 Diklat Coremap-CTI an Giri Wilisandy 146 Component 1 Pembayaran Tuition Fee Fall 2021-Spring 2022 dll Prog S2 Bappenas 211401105001536 15-Nov-21 University of Rhode Island 2.329.994.005,00 100% 2.329.994.005,00 14.255 163.451,00 LN utk Karyasiswa Desak Made Pera Rosita Dewi, dkk 5 Orang a.n URI 147 Component 1 Pemb TF Fall 2021 dll Prog S2 LN Diklat Coremap-CTI Bappenas 211401105001539 15-Nov-21 University of Rhode Island 1.771.953.520,00 100% 1.771.953.520,00 14.255 124.304,00 Karyasiswa Joyke Fredy Bastian Rumajar dkk(7 Orang) a.n University of Rhode Island 148 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401303000525 26-Nov-21 Endiena Bulan Mutiara Sani, dkk 4 9.305.104,00 100% 9.305.104,00 14.340 648,89 Nasional COREMAP-CTI a.n Endiena Bulan Mutiara Sani, Orang dkk 4 Orang 149 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401302000584 26-Nov-21 Tommy Hermawan, dkk (2 Orang) 5.075.000,00 100% 5.075.000,00 14.340 353,91 Nasional COREMAP-CTI a.n Tommy Hermawan, dkk (2 Orang) 150 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000350 25-Nov-21 Suryadi Fadillah 2.469.057,00 100% 2.469.057,00 14.340 172,18 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Suryadi Fadillah 151 Component 1 Pembayaran Tunjangan Biaya Hidup dll Pelatihan Bappenas 211401304000349 25-Nov-21 Arief Sudianto 1.998.000,00 100% 1.998.000,00 14.340 139,33 Nasional PRL Tingkat Menengah Angkatan II Tahun 2021 Coremap-CTI a.n Arief Sudianto 152 Component 1 Pemb Tunj Pelatihan dll Prog Pelatihan Nasional PRL Bappenas 211401304000356 26-Nov-21 Yuli Deviani Riadi, Dkk(2 Orang) 4.603.794,00 100% 4.603.794,00 14.340 321,05 Tingkat Menengah II Tahun 2021 Coremap-CTI a.n Yuli Deviani Riadi, Dkk(2 Orang) 153 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000357 26-Nov-21 I Gede Wina Parmana Putra 4.622.337,00 100% 4.622.337,00 14.340 322,34 Nasional PRL Tingkat Menengah I Tahun 2021 Coremap- CTI a.n I Gede Wina Parmana Putra 154 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000351 25-Nov-21 Deenisa Rochadjia, dkk 6 Orang 23.535.476,00 100% 23.535.476,00 14.340 1.641,25 Nasional Diklat COREMAP-CTI a.n Deenisa Rochadjia, dkk 6 Orang 155 Component 1 Pemb Travel Insurance Program Diklat Luar Negeri Bappenas 211401302000577 25-Nov-21 PT Zurich Asuransi Indonesia 9.833.000,00 100% 9.833.000,00 14.340 685,70 Coremap-CTI Karyasiswa Mochamad Idnillah dkk (13 orang) a.n PT Zurich Asuransi Indonesia 156 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401301000204 25-Nov-21 Arief Widianto 2.243.000,00 100% 2.243.000,00 14.340 156,42 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Arief Widianto 157 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000358 26-Nov-21 Supradianto Nugroho 2.505.000,00 100% 2.505.000,00 14.340 174,69 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Supradianto Nugroho 158 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000348 25-Nov-21 Yusuf Arief Afandy 2.734.090,00 100% 2.734.090,00 14.340 190,66 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Yusuf Arief Afandy 159 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000360 26-Nov-21 Budi Mulyono 2.205.000,00 100% 2.205.000,00 14.340 153,77 Nasional Perencanaan Diklat COREMAP-CTI a.n Budi Mulyono 160 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000359 26-Nov-21 Alex Fransisca 2.155.000,00 100% 2.155.000,00 14.340 150,28 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Alex Fransisca 1 2 3 4 5 6 7 8 9 10 11 12 13 14 161 Component 1 Pemb Bench Fee 2021-2022 dll Program S2 Luar Negeri Bappenas 211401105001613 26-Nov-21 University of Rhode Island 287.244.540,00 100% 287.244.540,00 14.340 20.031,00 Coremap-CTI utk Desak Made Pera Rosita Dewi dkk 5 Orang an University of Rhode Island 162 Component 1 Penggantian Uang Persediaan Ke-21 Pada PPK 06.10 Bappenas 211401303000557 02-Dec-21 BPG 019 KEMENTERIAN PPN/BAPP 1.648.400 100% 1.648.400,00 14.348 114,89 untuk Keperluan Belanja Barang Non Operasional Lainnya ENAS 163 Component 1 Pembayaran Tunjangan Pelatihan dll Pelatihan Nasional Bappenas 211401304000386 03-Dec-21 Muhammad Aththaar Nazim 4.485.088 100% 4.485.088,00 14.348 312,59 PRL Tingkat Menengah II Tahun 2021 Diklat Coremap-CTI a.n Muhammad Aththaar Nazim 164 Component 1 Pemb Tunj Pelatihan dll Prog Pelatihan Nasional PRL Bappenas 211401302000607 01-Dec-21 Nurfitri Syadiah 23.166.568 100% 23.166.568,00 14.348 1.614,62 Tingkat Menengah II Tahun 2021 Coremap-CTI a.n Nurfitri Syadiah 165 Component 1 Pembayaran Biaya Hidup dll Program Pendidikan dan Bappenas 211401105001669 08-Dec-21 Selvia Oktaviyani 17.074.120 100% 17.074.120,00 14.348 1.190,00 Pelatihan Luar Negeri COREMAP-CTI a.n Ibu Selvia Oktaviyani 166 Component 1 Pemb Pelatihan The Science for Sustainable Fisheries Bappenas 211401105001629 02-Dec-21 University of Rhode Island 720.169.164 100% 720.169.164,00 14.348 50.193,00 Policy Professional Short Course dll Coremap-CTI utk Augy Syahailatua dkk 13 Org an 167 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001647 03-Dec-21 Setyawati 13.487.120 100% 13.487.120,00 14.348 940,00 COREMAP-CTI a.n Setyawati 168 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001651 06-Dec-21 Lelly Hasni Pertamawati 13.487.120 100% 13.487.120,00 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II an Ibu Lelly Hasni Pertamawati 169 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001646 03-Dec-21 Mochamad Idnillah 13.487.120 100% 13.487.120,00 14.348 940,00 COREMAP-CTI a.n Bpk Mochamad Idnillah 170 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001665 06-Dec-21 Februanty Suyatiningsih Purnomo 13.487.120 100% 13.487.120,00 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II an Februanty Suyatiningsih Purnomo 171 Component 1 Pembayaran International Travel Program Diklat Luar Bappenas 211401302000658 09-Dec-21 PT. Jendela Dunia Wisata 23.537.473 100% 23.537.473,00 14.378 1.637,05 Negeri Coremap-CTI Karyasiswa Hary Christijanto a.n PT. Jendela Dunia Wisata 172 Component 1 Pemb International travel Prog Coremap-CTI utk Bappenas 211401302000675 13-Dec-21 PT. Jendela Dunia Wisata 47.570.332 100% 47.570.332,00 14.378 3.308,55 Karyasiswa Augy Syahailatua, dkk 2 orang a.n PT. Jendela Dunia Wisata 173 Component 1 Pemb International travel Prog Coremap-CTI utk Bappenas 211401302000676 13-Dec-21 PT. Jendela Dunia Wisata 47.570.270 100% 47.570.270,00 14.378 3.308,55 Karyasiswa Mochammad Rachadian Prayoga, dkk 2 org a.n PT. Jendela Dunia Wisata 174 Component 1 Pembayaran International Travel Program Pelatihan Bappenas 211401302000692 14-Dec-21 PT. Jendela Dunia Wisata 47.570.270 100% 47.570.270,00 14.348 3.315,46 Diklat Luar Negeri Coremap-CTI utk Karyasiswa Boma Kresning, dkk (2 orang) 175 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001678 10-Dec-21 Mohamad Agung Widodo 13.487.120 100% 13.487.120,00 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II an Sdr Mohamad Agung Widodo 176 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Luar Bappenas 211401105001687 13-Dec-21 Ita Wulandari 69.960.848 100% 69.960.848,00 14.348 4.876,00 Negeri COREMAP-CTI a.n Ita Wulandari 177 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105001703 14-Dec-21 Desak Made Pera Rosita Dewi 69.960.848 100% 69.960.848,00 14.348 4.876,00 Negeri Periode Jan - Mar 2022 Coremap-CTI a.n Desak Made Pera Rosita Dewi 178 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105001686 13-Dec-21 Restya Rahmaniar 69.960.848 100% 69.960.848,00 14.348 4.876,00 Negeri COREMAP-CTI a.n Restya Rahmaniar 179 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 LN Bappenas 211401105001685 13-Dec-21 Meydar H Saleh 69.960.848 100% 69.960.848,00 14.348 4.876,00 COREMAP-CTI a.n Meydar H Saleh 180 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105001702 14-Dec-21 Alan Ray Farandy 69.960.848 100% 69.960.848,00 14.348 4.876,00 Negeri Periode Jan - Mar 2022 Coremap-CTI a.n Alan Ray Farandy 1 2 3 4 5 6 7 8 9 10 11 12 13 14 181 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001679 10-Dec-21 Hary Christijanto 14.979.312 100% 14.979.312,00 14.348 1.044,00 Sustainable Fisheries Policy Professional Short Course II a.n Hary Christijanto 182 Component 1 Pertanggungjawaban Tambahan Uang Persediaan Ke 6 Pa Bappenas 211401701000182 21-Dec-21 BPG 019 KEMENTERIAN PPN/BAPP 962.751.012 100% 962.751.012 14.349 67.095,34 da PPK 06.10 untuk Keperluan Belanja Barang Non Opera ENAS sional Lainnya 183 Component 1 Pertanggungjawaban Tambahan Uang Persediaan Ke 6 Pa Bappenas 211401701000207 29-Dec-2021 Bendahara Pengeluaran 937.268.219 100% 937.268.219,00 14.265 65.704,05 da PPK 06.10 untuk Keperluan Belanja Barang Non Opera sional Lainnya 184 Component 1 Pembayaran Belanja Modal Berupa Pembayaran Jasa LIPI 210881302001089 8 Februari 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 3.732.586.620,00 100% 3.732.586.620,00 14.000 266.613,33 Konstruksi Pembangunan Gedung Pusat Data Nasional November 2019 Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 185 Component 1 Pembayaran Termin I Paket Pekerjaan Manajemen LIPI 210881302001170 10 Februari 2021 1416/IPK.2.03/LK/V/2019, 10 PT. WAHANA CIPTA 90.071.254,08 100% 90.071.254,08 13.989 6.438,72 Konstruksi Pembangunan Gedung Pusat Data Nasional Mei 2019 BANGUNWISMA Ekosistem Pesisir, Laboratorium dan Ruang Kerja, sesuai dengan SPK Nomor: 1416/IPK.2.03/LK/V/2019 tanggal 10 Mei 186 Component 1 Pembayaran Termin II Pekerjaan Pembangunan Gedung LIPI 210881302001349 15 Februari 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 3.820.291.856,25 100% 3.820.291.856,25 13.875 275.336,35 Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan November 2019 Ruang Kerja Pusat Penelitian Oseanografi 187 Component 1 Pembayaran Belanja Modal (PHLN-COREMAP) berupa LIPI 210881302001987 2 Maret 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 1.767.299.305,38 100% 1.767.299.305,38 14.371 122.976,78 Pembayaran Termin III Pekerjaan Pembangunan Gedung November 2019 Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI 188 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301002882 10 Maret 2021 Bendahara Pengeluaran 169.456.051,62 100% 169.456.051,62 14.418 11.753,09 Perjalanan Dinas (PHLN- COREMAP) dalam rangka kegiatan Reef Health Monitoring di Kabupaten Tapanuli Tengah tanggal 13-23 Maret 2021 189 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301003100 15 Maret 2021 Bendahara Pengeluaran 131.043.039,30 100% 131.043.039,30 14.418 9.088,85 perjalanan dinas (PHLN- COREMAP-051) dalam rangka kegiatan verifikasi Tempat Uji Kompetensi (TUK) ke Universitas Bangka Belitung tanggal 16 s.d. 19 Maret 2021 190 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301003099 15 Maret 2021 Bendahara Pengeluaran 162.900.042,84 100% 162.900.042,84 14.418 11.298,38 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan pengambilan data monitoring kesehatan terumbu karang dan ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) 191 Component 1 Pembayaran Belanja Modal (PHLN-COREMAP) berupa LIPI 210881303002272 12 Maret 2021 4414/IPK.2.03/LK/XII/2019, PT Anugrah Bangun Kencana 3.325.114.051,56 100% 3.325.114.051,56 14.418 230.622,42 Pembayaran Pekerjaan Penyelesaian Pembangungan Tanggal 16 Desember 2019 Gedung Laboratorium BBIL Mataram LIPI 192 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302002644 15 Maret 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 1.767.299.182,02 100% 1.767.299.182,02 14.418 122.575,89 berupa Pembayaran Termin IV Pekerjaan Pembangunan November 2019 Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium Dan Ruang Kerja Pusat Oseanografi Lipi 193 Component 1 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301002965 12 Maret 2021 Bendahara Pengeluaran 6.248.040,30 100% 6.248.040,30 14.418 433,35 Barang (PHLN-COREMAP-051) Dari Bendahara Pengeluaran (Jakarta) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 194 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301003751 24 Maret 2021 Bendahara Pengeluaran 164.770.064,78 100% 164.770.064,78 14.446 11.405,93 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka kegiatan Reef Health Monitoring di Kabupaten Kepulauan Mentawai, Sumatera Barat, tanggal 29 Maret s.d 09 April 2021 195 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302003294 29 Maret 2021 1416/IPK.2.03/LK/V/2019, 10 PT. Wahana Cipta Bangunwisma 67.345.338,60 100% 67.345.338,60 14.481 4.650,60 berupa pembayaran termin II Pekerjaan Jasa Konsultansi Mei 2019 Manajemnen Konstruksi Pembangunan Gedung pusat data nasional ekosistem pesisir, 196 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302003319 30 Maret 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 2.391.845.884,92 100% 2.391.845.884,92 14.481 165.171,32 berupa Pembayaran termin V, Pekerjaan Pembangunan November 2019 Gedung Pusat Data Nasional Ekosistem Pesisir Laboratorium Dan Ruang Kerja Pusat Oseanografi LIPI 197 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301004547 7-Apr-2021 106.028.059,49 100% 106.028.059,49 14.513 7.305,73 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti kegiatan uji kompetensi di Tempat Uji Kompetensi (TUK) Sewaktu Universitas Bangka Belitung tanggal 8 s.d. 12 April 2021 198 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301004910 13-Apr-2021 194.110.062,24 100% 194.110.062,24 14.631 13.267,04 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka pelaksanaan Reef Health Monitoring RHM), tanggal 21 April s.d 01 Mei 2021, di Kabupaten Raja Ampat, Batanta Salawati 199 Component 1 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701002863 13-Apr-2021 17.982.084,24 100% 17.982.084,24 14.631 1.229,04 Barang (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20032 Tanggal 12 April 2021 200 Component 1 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004747 8-Apr-2021 44.090.957,43 100% 44.090.957,43 14.631 3.013,53 Barang (PHLN,COREMAP,051) dari BP Pusat Jakarta Sesuai SPP Nomor 20025 Tanggal 8 April 2021 201 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002962 15-Apr-2021 48.371.869,11 100% 48.371.869,11 14.633 3.305,67 barang (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20041 Tanggal 15 April 2021 202 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002959 14-Apr-2021 470.903.841,35 100% 470.903.841,35 14.633 32.180,95 barang (PHLN,COREMAP,051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20039 Tanggal 14 April 2021 203 Component 1 Pertanggungjawaban TUP untuk keperluan Belanja Modal LIPI 210881701003013 15-Apr-2021 2.724.747,48 100% 2.724.747,48 14.508 187,81 (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 10010 Tanggal 14 April 2021 204 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302004799 26-Apr-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 2.557.936.163,48 100% 2.557.936.163,48 14.489 176.543,32 berupa Pembayaran Termin VI, Pekerjaan Jasa Tanggal 11/11/2019 Konstruksi PembangunanGedung Pusat Data Nasional Ekosistem Pesisir Laboratoiun dan Ruang kerja Pusat Oseanografi LIPI, 205 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301006093 28-Apr-2021 250.192.012,30 100% 250.192.012,30 14.510 17.242,73 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Pelatihan Asesor Kompetensi TA 2021 bersama Badan Nasional Sertifikasi Profesi (BNSP) tanggal 29 April s.d. 5 Mei 2021 di Bali 206 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301006505 4-May-2021 136.272.051,17 100% 136.272.051,17 14.467 9.419,51 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti survei kegiatan pengambilan data guna penyusunan kajian akademis ICRG PES, tanggal 5 s.d. 11 Mei 2021 di Perairan Nusa Dua Bali 1 2 3 4 5 6 7 8 9 10 11 12 13 14 207 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881303005006 3-May-2021 0758/PPK/IV/PK/KU/4/2021 PT. GRAND KOMODO TOURS 158.999.997,51 100% 158.999.997,51 14.467 10.990,53 berupa pembayaran Pengadaan Jasa Sewa Kapal untuk tanggal 15 April 2021 kegiatan Penelitian Reef Health Monitoring secara Live On Boards di Raja Ampat Koordinator Ni Wayan Purnamasari P2O LIPI 208 Component 1 Penggantian UP untuk keperluan belanja barang LIPI 210881301007249 11-May-2021 3.187.025,06 100% 3.187.025,06 14.198 224,47 (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 20060 Tanggal 11 Mei 2021 209 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005294 11-May-2021 5.300.539,34 100% 5.300.539,34 14.198 373,33 barang (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 20058 Tanggal 11 Mei 2021 210 Component 1 Pembayaran Belanja Modal (PHLN,COROEMAP,051) LIPI 210881303006016 11-May-2021 0941/PPK/IV/PK/KU/4/2021 PT. TRIASIH CIPTA JAYA 74.250.002,78 100% 74.250.002,78 14.198 5.229,61 berupa pembayaran Pengadaan Komputer Pendukung tanggal 27 April 2021 Proses Data Pusat Penelitian Oseanografi LIPI sesuai SPK No: 0941/PPK/IV/PK/KU/4/2021 tanggal 27 April 2021, 211 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007073 10-May-2021 54.974.939,96 100% 54.974.939,96 14.198 3.872,02 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka dalam Kegiatan RHM CoremapCTI tanggal 18 s.d. 24 Mei 2021 dkk ke Pulau Pari, a.n. Susi Rahmawati,dkk 212 Component 1 Penggantian UP untuk Keperluan Belanja Barang LIPI 210881301006871 6-May-2021 32.905.994,70 100% 32.905.994,70 14.198 2.317,65 (PHLN,COREMAP,051) dari Bendahara Pengeluaran Pusat- Jakarta Sesuai SPP Nomor 20052 Tanggal 5 Mei 2021 213 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005434 17-May-2021 59.263.153,74 100% 59.263.153,74 14.203 4.172,58 barang (PHLN,COREMAP,051), dari BPP.5 P2O Jakarta Sesuai SPP Nomor 20063 Tanggal 17 Mei 2021 214 Component 1 Pertanggungjawaban TUP untuk keperluan belanja Modal LIPI 210881701005431 17-May-2021 3.003.508,41 100% 3.003.508,41 14.203 211,47 (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 10014 Tanggal 17 Mei 2021 215 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005438 17-May-2021 131.945.017,82 100% 131.945.017,82 14.203 9.289,94 barang (PHLN,COREMAP,051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20066 Tanggal 17 Mei 2021 216 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007900 24-May-2021 222.041.977,56 100% 222.041.977,56 14.362 15.460,38 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Mengikuti Kegiatan Monitoring Kesehata n Terumbu Karang dan Ekosistem Terkait (RHM) di Kepulauan Derawan, Berau, Kalimantan Timur, 217 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302006336 20-May-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 2.557.936.254,52 100% 2.557.936.254,52 14.362 178.104,46 berupa Pembayaran Termin VII Pekerjaan Pembangunan Tanggal 11/11/2019 Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI 218 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007668 21-May-2021 443.690.005,46 100% 443.690.005,46 14.362 30.893,33 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Kegiatan Reef Health Monitoring Coremap-CTI ke Batam Kepulauan RIau dan Kepulauan Buton sesuai Surat Tugas nomor B-3801/II/TU.01.01/5/2021 219 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007995 27-May-2021 140.061.987,00 100% 140.061.987,00 14.310 9.787,70 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Mengikuti kegiatan sertifikasi kompetensi di Tempat Uji Kompetensi (TUK) Sewaktu, Universitas Sam Ratulangi, Manado, Sulawesi Utara, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 220 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302006753 28-May-2021 34/IGP/K/IV/2021 tanggal 29 CV. Indo Graha Persada 44.737.066,80 100% 44.737.066,80 14.310 3.126,28 Berupa Pengadaan bahan untuk keperluan Pelatihan April 2021 Asesor Kompetensi P2O LIPI Koord; Triyono, M.Si., sesuai Kwitansi Nomor: 34/IGP/K/IV/2021 tanggal 29 April 2021 221 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301008854 8-Jun-2021 46.612.066,74 100% 46.612.066,74 14.262 3.268,27 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan verifikasi Tempat Uji Kompetensi (TUK) di Univeritas Trunojoyo Madura tanggal 9 s.d 12 Juni 2021 222 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301009053 9-Jun-2021 25.757.029,38 100% 25.757.029,38 14.262 1.805,99 perjalanan dinas (PHLN,COREMAP,051) dalam rangka menghadiri Kegiatan FGD dan Penyusuan Final Draft Kajian Akademis PES ICRG, tanggal 9 s.d. 10 Juni 2021 di Bogor, Jawa Barat 223 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301009105 9-Jun-2021 158.397.951,66 100% 158.397.951,66 14.222 11.137,53 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan pengambilan data monitoring kesehatan terumbu karang dan ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) Kota Sabang 224 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301009363 14-Jun-2021 270.129.965,82 100% 270.129.965,82 14.222 18.993,81 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka monitoring safeguard kegiatan Reef Health Monitoring (RHM) Coremap-CTI di Perairan Pulau Weh dan kegiatan RHM Ternate tanggal 13 s.d. 17 Juni 2021 225 Component 1 Pembayaran Belanja barang berupa pembayaran LIPI 210881301009398 14-Jun-2021 240.393.043,80 100% 240.393.043,80 14.222 16.902,90 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan Pelatihan Penilaian Kondisi Terumbu Karang dan Uji Kompetensi (TUK) Sewaktu tanggal 13 s.d. 22 Juni 2021 di Universitas Bangka Belitung 226 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301009725 16-Jun-2021 24.045.998,77 100% 24.045.998,77 14.257 1.686,61 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Menghadiri kegiatan monitoring dan evaluasi program restorasi terumbu karang 227 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008269 18-Jun-2021 723.008.578,93 100% 723.008.578,93 14.453 50.024,81 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20092 Tanggal 18 Juni 2021 228 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008433 21-Jun-2021 12.031.688,91 100% 12.031.688,91 14.453 832,47 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20095 Tanggal 18 Juni 2021 229 Component 1 Pembayaran belanja barang berupa perjalanan dinas LIPI 210881301009948 18-Jun-2021 250.191.980,69 100% 250.191.980,69 14.453 17.310,73 (PHLN,COREMAP,051) paket meeting Luar Kota kegiatan pelatihan asesor kompetensi 2021 tanggal 29 April s.d. 5 Mei 2021 di Nusa Dua Bali 230 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302008163 22-Jun-2021 105/AMP-LIPI/Faktur/VI/2021 PT Arsi Mandiri Putra 45.513.541,26 100% 45.513.541,26 14.421 3.156,06 berupa Pembayaran Biaya Pekerjaan Pengadaan Bahan tanggal 18 Juni 2021 Kegiatan Uji Kompetensi Skema Penilai Kondisi Terumbu Karang di TUK FPPB Universitas Bangka Belitung 231 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301010417 24-Jun-2021 295.890.002,10 100% 295.890.002,10 14.454 20.471,15 perjalanan dinas (PHLN, COREMAP,051) dalam rangka kegiatan survey kesehatan terumbu karang (RHM) coremap-CTI ke Natuna Kepulauan Riau tanggal 28 Juni s.d. 9 Juli 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 232 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302008477 29-Jun-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 555.239.119,68 100% 555.239.119,68 14.472 38.366,44 berupa pembayaran termin VIII Pembangunan Gedung Tanggal 11/11/2019 Pusat Data Nasional Ekosistem Pesisir Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, sesuai SPK Nomor: 3913/IPK.2.03/LK/XI/2019 233 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301011312 08/07/2021 Bendahara Pengeluaran 196.478.300,00 100% 196.478.300,00 14.548 13.505,52 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti kegiatan RHM COREMAP di Kota Kendari, Sulawesi Tenggara tanggal 8 s.d. 17 Juli 2021, 234 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301012213 22/07/2021 Bendahara Pengeluaran 164.370.000,00 100% 164.370.000,00 14.554 11.293,80 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka pengambilan data monitoring kesehatan terumbu karang ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) 235 Component 1 Pertanganggungjawaban TUP untuk keperluan belanja LIPI 210881701010847 27/07/2021 Bendahara Pengeluaran 31.000.000,00 100% 31.000.000,00 14.494 2.138,82 Modal (PHLN,COREMAP, 051) dari BPP.2 Cibinong, Sesuai SPP Nomor 10018 Tanggal 26 Juli 2021 236 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302009782 23/07/2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 3.654.194.600,00 100% 3.654.194.600,00 14.494 252.117,75 Berupa Pembayaran termin IX (Retensi) Pekerjaan Tanggal 11/11/2019 Pembangunan Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan RUang Kerja Pusat Penelitian Oseanografi LIPI 237 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010930 28/07/2021 Bendahara Pengeluaran 929.388.920,00 100% 929.388.920,00 14.498 64.104,63 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20114 Tanggal 27 Juli 2021 238 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301012705 30/07/2021 Bendahara Pengeluaran 38.145.000,00 100% 38.145.000,00 14.342 2.659,67 perjalanan dinas (PHLN, COREMAP,051) dalam rangka 239 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302010248 02/08/2021 2690/IPK.2.03/LK/VI/2018 PT.JAKARTA KONSULTINDO 242.790.000,00 100% 242.790.000,00 14.342 16.928,60 berupa Pembayaran tahap IV Pekerjaan Pengadaan jasa tanggal 25 Juni 2018 konsultansi perencanaan DED dan UKL-UPL Pemba 240 Component 1 Pembayaran belanja barang berupa pembayaran LIPI 210881301014173 18/08/2021 Bendahara Pengeluaran 105.875.000,00 100% 105.875.000,00 14.383 7.361,12 perjalanan dinas (PHLN, COREMAP,051) dalam rangka 241 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301014040 18/08/2021 Bendahara Pengeluaran 123.420.000,00 100% 123.420.000,00 14.383 8.580,96 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka 242 Component 1 embayaran Belanja Modal (PHLN,COREMAP,051) berupa LIPI 210881303012168 23/08/2021 1585/PPK/IV/PK/KU/5/2021 PT. DATASCRIP 81.568.181,00 100% 81.568.181,00 14.415 5.658,56 Pembayaran Pengadaan Belanja Modal Peralatan dan tanggal 21 Juni 2021 Mesin Berupa Meubelair Perkantoran BBIL (Paket 3) Pembiayaan Coremap CTI sesuai Surat Pesanan Nomor: 243 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301014665 25/08/2021 Bendahara Pengeluaran 63.213.000,00 100% 63.213.000,00 14.408 4.387,35 Perjalanan dinas (PHLN, COREMAP,051) dalam rangka 244 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301014625 25/08/2021 Bendahara Pengeluaran 54.900.000,00 100% 54.900.000,00 14.408 3.810,38 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka mengikuti kegiatan Study Banding Pengembangan Model 245 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,LIPI) LIPI 210881303012407 25/08/2021 Nomor: SEJAHTERA BALI FURINDO PT 46.233.727,00 100% 46.233.727,00 14.408 3.208,89 berupa E-Purchasing Pengadaan Belanja Modal Peralatan 1621/PPK/IV/PK/KU/5/2021 246 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301014701 26/08/2021 Bendahara Pengeluaran 23.400.000,00 100% 23.400.000,00 14.408 1.624,10 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti Survei kegiatan riset dan pengemba ngan monitoring kesehatan terumbu karang dan ekosistem 247 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013075 30/08/2021 Bendahara Pengeluaran 297.904.055,00 100% 297.904.055,00 14.374 20.725,20 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20136 Tanggal 30 Agustus 2021 248 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301014874 27/08/2021 Bendahara Pengeluaran 241.047.000,00 100% 241.047.000,00 14.374 16.769,65 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka 1 2 3 4 5 6 7 8 9 10 11 12 13 14 249 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303012553 30/08/2021 2026/PPK/IV/PK/KU/8/2021 CV. FAJAR LAKSANA 90.750.000,00 100% 90.750.000,00 14.374 6.313,48 berupa Pembayaran Pengadaan Belanja Modal Peralatan tanggal 2 Agustus 2021 Pendukung Laboratorium Balai Bio Industri Laut (BBIL) 250 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303012997 02/09/2021 0742/PPK/IV/PK/KU/5/2021 PT.Dekoruma Niaga Sejahtera 83.002.500,00 100% 83.002.500,00 14.284 5.810,87 Berupa Permbayaran Jasa Konsultansi Pekerjaan tanggal 17 Mei 2021 251 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302012290 06/09/2021 1909/PPK/IV/PK/KU/7/2021 CV.AKBAR ABADI JAYA 40.000.000,00 100% 40.000.000,00 14.261 2.804,85 berupa Pengadaan Pekerjaan Pintu Pagar Gedung BBIL tanggal 16 Juli 2021 252 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301015704 08/09/2021 Bendahara Pengeluaran 187.428.000,00 100% 187.428.000,00 14.272 13.132,57 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka 253 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013973 10/09/2021 Bendahara Pengeluaran 54.466.471,00 100% 54.466.471,00 14.272 3.816,32 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta 254 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301015571 07/09/2021 Bendahara Pengeluaran 82.514.000,00 100% 82.514.000,00 14.272 5.781,53 perjalanan dinas (PHLN, COREMAP,051) dalam rangka 255 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303014007 15-Sep-2021 1731/PPK/IV/PK/KU/6/2021 PT HOME CENTER INDONESIA 466.226.000,00 100% 466.226.000,00 14.155 32.937,20 berupa pembayaran Pengadaan Belanja Modal Peralatan tanggal 29 Juni 2021 dan Mesin Berupa Meubelair Perkantoran BBIL (Paket 1) Pembiayaan Coremap-CTI Tahun Anggaran 2021 256 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015360 29-Sep-2021 Bendahara Pengeluaran 536.061.550,00 100% 536.061.550,00 14.155 37.870,83 barang (PHLN, COREMAP, 051) dari BP Pusat Jakarta 257 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016763 21-Sep-2021 Bendahara Pengeluaran 24.372.000,00 100% 24.372.000,00 14.165 1.720,58 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka mengikuti kegiatan Studi Budidaya dan Pengem bangan Teknik Reproduksi Aseksual Pada Karang Hias 258 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881301019130 18-Oct-2021 Bendahara Pengeluaran 152.426.000,00 100% 152.426.000,00 14.165 10.760,75 berupa Perjalanan Dinas dalam rangka mengikuti kegiatan RHM COREMAP di Lombok Barat, NTB 259 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881301017076 24-Sep-2021 88.KW/FHK/IX/2021 Tanggal CV FAJRI HUTAMA KARYA 25.060.500,00 100% 25.060.500,00 14.165 1.769,18 berupa Pembayaran Pengadaan Bahan Penelitian RHM 22 September 2021 Sumba Timur (Koordinator Tri Aryono) sesuai kwitansi Nomor 88.KW/FHK/IX/2021 Tanggal 22 September 2021 260 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302013417 24-Sep-2021 47/K/AJM/IX/2021 tanggal 17 CV. ALSABIL JAYA MANDIRI 15.112.000,00 100% 15.112.000,00 14.165 1.066,85 berupa pembayaran Pengadaan Bahan Penelitian RHM September 2021 Tual Maluku Utara (Koordinator Teddy Triandiza) sesuai Kwitansi Nomor 47/K/AJM/IX/2021 tanggal 17 261 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303016311 13-Oct-2021 2569/PPK/IV/PK/KU/9/2021 PT Airmas Mataram Internusa 68.767.273,00 100% 68.767.273,00 14.165 4.854,73 berupa pembayaran e purchasing pengadaan belanja tanggal 3 September 2021 modal perlatan mesih berupa papan tulis digital sesuai dengan SPK No: 2569/PPK/IV/PK/KU/9/2021 tanggal 3 September 2021 262 Component 1 Penggantian UP untuk keperluan belanja barang LIPI 210881301016766 21-Sep-2021 Bendahara Pengeluaran 32.573.000,00 100% 32.573.000,00 14.165 2.299,54 (PHLN,COREMAP,051) dari BP Pusat Jakarta 263 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881303014806 28-Sep-2021 2227/PPK/IV/PK/KU/8/2021 PT. COMFINDO MITRA PRIMA 48.430.000,00 100% 48.430.000,00 14.165 3.418,99 berupa Pengadaan Spare Parts Laminar Air Flow untuk tanggal 26 Agustus 2021 264 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301017228 28-Sep-2021 Bendahara Pengeluaran 276.212.000,00 100% 276.212.000,00 14.165 19.499,61 perjalanan dinas (PHLN, COREMAP,051) dalam rangka 265 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302013528 28-Sep-2021 143-SBA/KW/IX/2021 tanggal 7 PT. SARANA BUJANA ARTA 34.500.000,00 100% 34.500.000,00 14.165 2.435,58 berupa Pembayaran Jasa Pemindahan genset dari P2O September 2021 266 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017070 24-Sep-2021 Bendahara Pengeluaran 16.250.000,00 100% 16.250.000,00 14.165 1.147,19 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan Monitoring Kegiatan ICRG COREMAP CTI (M.Abrar) tanggal 25 s.d. 29 September 2021 di Bali 267 Component 1 Pembayaran Belanja Modal (PHLN,COREMPA,051) LIPI 210881303015467 5-Oct-2021 2565/PPK/IV/PK/KU/9/2021 PT Airmas Mataram Internusa 74.597.273,00 100% 74.597.273,00 14.165 5.266,31 berupa pembayaran E-Purchasing Pengadaan Belanja tanggal 03 september 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 268 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015597 30-Sep-2021 Bendahara Pengeluaran 1.164.615,00 100% 1.164.615,00 14.165 82,22 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta, 269 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017340 29-Sep-2021 Bendahara Pengeluaran 229.282.000,00 100% 229.282.000,00 14.165 16.186,52 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka melaksananan kegiatan RHM COREMAP CTI di Kepulauan Kei Maluku tanggal 2 s.d. 12 Oktober 2021 270 Component 1 Pembayaran Belanja Modal (PHN,COREMAP,051) berupa LIPI 210881302014054 5-Oct-2021 2481/PPK/IV/PK/KU/9/2021 PT Elo Karsa Utama 20.412.727,00 100% 20.412.727,00 14.165 1.441,07 pembayaran e-Purchasing Belanja Modal Perlatan dan tanggal 6 September 2021 271 Mesin berupa Component 1 Pembayaran Micropippet Belanja Barang Multichannel (PHLN,COREMAP,051) LIPI 210881302013047 17-Sep-2021 2374/PPK/IV/IPK/KU/8/2021 PT. Sunindo Indah Hotel Corp 91.120.000,00 100% 91.120.000,00 14.165 6.432,76 berupa Pengadaan Paket Meeting Dalam Rangka tanggal 30 Agustus 2021 kegiatan pelatihan Recognition of current competency 272 Lembaga Sertifikasi Component 1 Pembayaran BelanjaProfesi, Pusat Penelitian Oseanografi modal (PHLN,COREMAP,051) LIPI 210881303015594 6-Oct-2021 2668/PPK/IV/PK/KU/9/2021 PT Mitra Mantari 51.971.055,00 100% 51.971.055,00 14.165 3.668,98 berupa E purchasing pengadaan belanja modal peralatan tanggal 13 September 2021 273 Component 1 Penggantian UP untuk keperluan belanja barang LIPI 210881301018323 11-Oct-2021 Bendahara Pengeluaran 676.000,00 100% 676.000,00 14.165 47,72 (PHLN,COREMAP, 051) dari BPP.4 Mataram 274 Component 1 Pembayaran Belanja modal (PHLN,COREMAP,051) LIPI 210881302014819 14-Oct-2021 2601/PPK/IV/PK/KU/9/2021 PT Elo Karsa Utama 98.181.818,00 100% 98.181.818,00 14.165 6.931,30 berupa E Purchasing Pengadaan belanja modal Peralatan tanggal 10 September 2021 dan Mesin Berupa Biosafety cabinet, sesuai dengan Surat Pesanan Nomor 2601/PPK/IV/PK/KU/9/2021 tanggal 10 September 2021 275 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701014363 15-Sep-2021 Bendahara Pengeluaran 2.815.000,00 100% 2.815.000,00 14.165 198,73 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 276 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301018627 13-Oct-2021 Bendahara Pengeluaran 67.678.000,00 100% 67.678.000,00 14.165 4.777,83 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka kegiatan Visiting ke penangkaran karang hias dalam rangka Pengembangan Panduan Batas Maksimum 277 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) LIPI 210881303016804 19-Oct-2021 1243934654 tanggal 1 Oktober PT HOME CENTER INDONESIA 23.790.000,00 100% 23.790.000,00 14.165 1.679,49 berupa e purchasing pengadaan belanja modal peralatan 2021 dan mesin berupa rak penyimpanan sesuai dengan 278 Component 1 Penggantian UP untuk keperluan belanja barang (PHLN, LIPI 210881301018322 11-Oct-2021 Bendahara Pengeluaran 8.218.000,00 100% 8.218.000,00 14.165 580,16 COREMAP, 051) dari BPP.4 Mataram 279 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881301020276 01-Nov-21 2230/PPK/IV/PK/KU/8/2021 PT. Dexatama Niaga Labtekindo 1.520.000.000 100% 1.520.000.000 14.261 106.584,39 berupa Pengadaan Belanja Modal Peralatan dan Mesin tanggal 24 Agustus 2021 Berupa Furniture Laboratorium Bio Industri Laut sesuai dengan SPK No 2230/PPK/IV/PK/KU/8/2021 tanggal 24 Agustus 2021 280 Component 1 embayaran Belanja Barang (PHLN,COREMAP,051) berupa LIPI 210881302015717 29-Oct-2021 KW/126/MN/X/2021 tanggal CV. Mega Niaga 14.756.000,00 100% 14.756.000 14.261 1.034,71 pembayaran pengadaan bahan penelitian RHM Lampung 27 Oktober 2021 Koordinator Tri Aryono sesuai dengan kwitansi nomor KW/126/MN/X/2021 tanggal 27 Oktober 2021 281 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302015711 29-Oct-2021 106/KW/PHJ/X/2021 tanggal CV. Putra Harapan Jaya 20.495.000,00 100% 20.495.000 14.261 1.437,14 berupa pembayaran Pengadaan bahan penelitian RHM 27 Oktober 2021 Lombok Barat NTB Koordinator Bayu Perisha, sesuai 282 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303019119 12-Nov-21 K211101/C tanggal 1 PT. New Module International 226.363.636,00 100% 226.363.636 14.243 15.892,97 berupa e purchasing pengadaan belanja modal peralatan Nopember 2021 dan mesin berupa mikroskop fluorescence dan kamera mikroskop, sesuai dengan Kontrak Nomor: 2615/PPK/IV/PK/KU/9/2021 Tanggal 13 September 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 283 Component 1 Pembayaran Belanja Modal(PHLN,COREMAP,051) berupa LIPI 210881303019087 12-Nov-21 K211101/C tanggal 1 PT. New Module International 35.700.000 100% 35.700.000 14.243 2.506,49 Pengadaan belanja modal peralatan dan mesin berupa Nopember 2021 Nikon Imaging Software sesuai dengan kwitansi nomor K211101/C tanggal 1 Nopember 2021 284 Component 1 Penggantian UP untuk keperluan belanja modal LIPI 210881301021629 15-Nov-21 Bendahara Pengeluaran 18.711.649 100% 18.711.649 14.243 1.313,74 (PHLN,COREMAP,051) dari BP Pusat Jakarta 285 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701020450 16-Nov-21 Bendahara Pengeluaran 210.968.564 100% 210.968.564 14.211 14.845,44 barang (PHLN,COREMAP, 051) dari BP Pusat Jakart 286 Component 1 Pembayaran Belanja modal (PHLN,COREMAP,051) LIPI 210881301022164 19-Nov-21 KWT 202101060 Tanggal 12 PT. Emiindo Jaya Bersama 39.077.273,00 100% 39.077.273 14.231 2.745,93 berupa permbayaran e purchasing belanja modal November 2021 peralatan dan mesin berupa UV Sterilizer, sesuai dengan Kwitansi Nomor KWT 202101060 Tanggal 12 November 2021 287 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303019796 19-Nov-21 1244036429 tanggal 15 PT. Home Center Indonesia 12.530.000,00 100% 12.530.000 14.231 880,47 berupa e purchasing belanja modal peralatan dan mesin November 2021 berupa loker dan meja tamu,sesuai dengan kuitansi Nomor 1244036429 tanggal 15 November 2021, 288 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021961 29-Nov-21 Bendahara Pengeluaran 477.050.577 100% 477.050.577 14.280 33.406,90 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta 289 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021963 29-Nov-21 Bendahara Pengeluaran 163.257.000 100% 163.257.000 14.280 11.432,56 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 290 Component 1 pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881301023250 30-Nov-21 Bendahara Pengeluaran 400.603.000 100% 400.603.000 14.340 27.936,05 berupa perjalanan dinas dalam rangka kegiatan sertifikasi penilai kondisi padang lamun dan komunitas mangroove di univ. pattimura ambon dan univ. hasanuddin makassar 291 Component 1 embayaran Belanja Modal (PHLN,COREMAP,051) berupa LIPI 210881302017971 30-Nov-21 2823/PPK/IV/PK/KU/9/2021 PT. ASTRAGRAPHIA XPRINS 145.409.091 100% 145.409.091 14.340 10.140,10 e purchasing belanja modal peralatan dan mesin berupa Tanggal 24 September 2021, INDONESIA Smart TV digital signage, sesuai dengan SPK Nomor: 2823/PPK/IV/PK/KU/9/2021 Tanggal 24 September 2021, 292 Component 1 ertanggungjawaban TUP utnuk keperluan belanja barang LIPI 210881701022037 30-Nov-21 Bendahara Pengeluaran 8.800.000,00 100% 8.800.000 14.340 613,67 (PHLN,COREMAP, 051) dari BPP.4 Mataram 293 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881301023875 3-Dec-2021 Bendahara Pengeluaran 611.655.000,00 100% 611.655.000,00 14.348 42.629,98 berupa perjalanan dinas dalam rangka kegiatan Konsinyering Data RHM serta Workshop Evaluasi Kegiatan RHM dan Inisiasi Jejaring pada tanggal 2 s.d. 9 Desember 2021 294 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701022653 2-Dec-2021 Bendahara Pengeluaran 406.788.052,00 100% 406.788.052,00 14.348 28.351,55 barang (PHLN,COREMAP, 051) dari BPG Pusat Jakarta 295 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) LIPI 210881303020933 1-Dec-2021 3517/PPK/IV/PK/KU/10/2021 CV. Wisata Karya 198.413.000,00 100% 198.413.000,00 14.348 13.828,62 berupa pengadaan Tirai Roler Blind dan Smoke ring Tanggal 28 Oktober 2021 Gorden Gedung balai bio industri laut sesuai dengan SPK No 296 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303021282 2-Dec-2021 3861/PPK/IV/PK/KU/11/2021 PT. Triasih Cipta Jaya 185.000.000,00 100% 185.000.000,00 14.348 12.893,78 pengadaan Belanja Modal Peralatan dan mesin berupa Tanggal 15 Nopember 2021 Perangkat pengolah data 297 Component 1 Pembayaran Belanja barang (PHLN,COREMAP,051) LIPI 210881304001481 8-Dec-2021 SPK Nomor: UNPATTI Ambon 199.360.000,00 100% 199.360.000,00 14.348 13.894,62 berupa Paket Pengadaan Swakelola Jasa Live On Board 3469/PPK/IV/PK/KU/10/2021 RHM di Teluk Cendrawasih Tanggal 29 Oktober 2021, 298 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302019360 10-Dec-2021 SPK Nomor: PT. Elo Karsa Utama 115.454.545,00 100% 115.454.545,00 14.378 8.029,94 berupa e purchasing pengadaan belanja modal Peralatan 3768/PPK/IV/PK/KU/11/2021 dan mesin berupa Bio Safety Cabinet sesuai Tanggal 11 Nopember 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 299 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302019513 13-Dec-2021 kwitansi Nomor CV. Almira Karabela 37.081.000,00 100% 37.081.000,00 14.378 2.579,01 berupa pengadaan bahan kegiatan uji kompetensi lamun 45/K/AK/XI/2021 tanggal 9 di TUK Universitas mataram November 2021 300 Component 1 pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302019527 13-Dec-2021 Kwitansi nomor CV. Glory Heart 47.832.000,00 100% 47.832.000,00 14.378 3.326,75 berupa pengadaan bahan kegiatan sertifikasi skema 66/GH/K/XI/2021 tanggal 25 padang lamun di universitas pattimura, November 2021 301 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302019524 13-Dec-2021 kwitansi nomor CV. Inovasi Multi Kreasi 34.136.000,00 100% 34.136.000,00 14.378 2.374,18 berupa pengadaan bahan konsinyering data RHM dan 080/K/IMK/XII/2021 tanggal 1 workshop evaluasi RHM COREMAP CTI 2021, Desember 2021 302 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302019512 13-Dec-2021 kwitansi nomor 096/K/CV- CV. Pancuran Emas Jaya 43.109.000,00 100% 43.109.000,00 14.378 2.998,26 berupa pengadaan bahan kegiatan sertifikasi kompetensi PEJ/XI/2021 tanggal 18 skemaMangrove dan Lamun di TUK Universitas November 2021 Diponegoro, 303 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023693 14-Dec-2021 Bendahara Pengeluaran 599.061.725 100% 599.061.725,00 14.348 41.752,28 barang (PHLN,COREMAP, 051) dari BPP pusat Jakarta 304 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302019574 13-Dec-2021 Kontrak Nomor: Phoenix Hotel Yogyakarta 232.317.000 100% 232.317.000,00 14.348 16.191,59 berupa Pekat meeting konsinyering data RHM, Workshop 4071/PPK/IV/PK/KU/12/20 Evaluasi dan inisiasi jejaring RHM nasional serta pembahasan Renja anggaran Coremap 2022, 305 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302019575 14-Dec-2021 kwitansi nomor CV. Alsabil Jaya Mandiri 24.630.000 100% 24.630.000,00 14.348 1.716,62 berupa pengadaan bahan perlengkapan laboratorium 76/K/AJM/XII/2021 tanggal 10 Puslit Oseanografi LIPI, Desember 2021 306 Component 1 Pembelian Belanja Barang (PHLN,COREMAP,051) berupa LIPI 210881303022924 14-Dec-2021 KW018/RST/XII/21 tanggal 10 PT. Royal Sarana Teknika 19.500.000 100% 19.500.000,00 14.348 1.359,07 pengadaan jasa perbaikan lemari pendingin laboratorium Desember 2021 mikrobiologi P2O LIPI sesuai dengan kwitansi nomor KW018/RST/XII/21 tanggal 10 Desember 2021 307 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302019653 14-Dec-2021 1416/IPK.2.03/LK/V/2019, tgl PT. Wahana CiptA Bangunwisma 180.142.500 100% 180.142.500,00 14.348 12.555,23 berupa pembayaran pemeliha raan atas Pekerjaan 10 mei 2019 Pengadaan jasa konsultansi Manajemen Konstruski pembangunan Gedung Pusat Data Nasional Ekosistem pesisir, Laboratorium dan ruang kerja 308 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) LIPI 210881303023417 16-Dec-2021 2514/PPK/IV/PK/KU/9/2021 PT. DEXATAMA NIAGA 8.312.700.000 100% 8.312.700.000 14.337 579.807,49 berupa pengadaan belanja modal peralatan dan mesin Tanggal 7 September 2021 LABTEKINDO berupa peralatan riset oseanografi 309 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302020006 17-Dec-2021 Kwitansi No 38/K/AK/X/2021 CV. Almira Karabela 34.063.000 100% 34.063.000,00 14.343 2.374,89 berupa peengadaan bahan kegiatan uji kompetensi tanggal 19 Oktober 2021 skema mangrove di TUK Fakultas pertanian Universitas Trunojoyo Madura 310 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024005 21-Dec-2021 SPK Nomor PT ESCO UTAMA 4.383.000.000 100% 4.383.000.000 14.349 305.456,83 berupa Pengadaan belanja modal peralatan dan mesin 4331/PPK/IV/PK/KU/12/2021 berupa alat Fume Hood, Tanggal 9 Desember 2021 311 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024136 22-Dec-2021 SPK Nomor CV. MEDIA GLOBAL MANDIRI 144.814.000 100% 144.814.000 14.349 10.092,27 berupa pengadaan Pengolah Data dan Komunikasi 3551/PPK/IV/PK/KU/11/2021 berupa Wifi, CCTV, dan Sound System Kedeputian Bidang Tanggal 1 Nopember 2021 IPK LIPI 312 Component 1 pembayaran belanja modal (PHLN,COREMAP,051) LIPI 210881303024072 22-Dec-2021 SPK Nomor CV. Wisata Karya 193.000.000 100% 193.000.000 14.349 13.450,42 berupa Pengadaan Furniture dan Kelengkapan Kantor 4202/PPK/IV/PK/KU/12/2021 BBIL Tanggal 1 Desember 2021, 313 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024293 27-Dec-2021 2447/PPK/IV/PK/KU/9/2021 PT KARYA MENTARI SERAYA 3.014.915.400 100% 3.014.915.400 14.219 212.034,28 berupa Pembayaran Termin II Pengadaan Belanja Modal Tanggal 3 September 2021 Peralatan dan Mesin Berupa Interior Laboratorium Gedung Pusat Nasional Ekosistem Pesisir 1 2 3 4 5 6 7 8 9 10 11 12 13 14 314 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024271 24-Dec-2021 2447/PPK/IV/PK/KU/9/2021 PT KARYA MENTARI SERAYA 3.014.915.401 100% 3.014.915.401 14.219 212.034,28 berupa Pembayaran Termin III Pengadaan Belanja Modal Tanggal 3 September 2021 Peralatan dan Mesin Berupa Interior Laboratorium 315 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024308 27-Dec-2021 2447/PPK/IV/PK/KU/9/2021 PT KARYA MENTARI SERAYA 4.019.887.201 100% 4.019.887.201 14.225 282.593,12 berupa Pembayaran Termin I Pengadaan Belanja Modal Tanggal 3 September 2021 Peralatan dan Mesin Berupa Interior Laboratorium Gedung Pusat Nasional Ekosistem Pesisir 316 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881303024303 27-Dec-2021 2598/PPK/IV/PK/KU/9/2021 PT. Trias Nathomi Chemindo 104.053.000 100% 104.053.000 14.225 7.314,80 berupa pekerjaan kalibrasi water furification Genetika, Tanggal 10 September 2021 317 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302020444 27-Dec-2021 2570/PPK/IV/PK/KU/9/2021 PT. Medquest jaya Global 96.988.182 100% 96.988.182,00 14.225 6.818,15 berupa e purchasing pengadaan belanja modal peralatan Tanggal 3 September 2021 mesin berupa Elisa Washer 318 Component 1 Penggantian UP untuk keperluan belanja barang LIPI 210881701027368 28-Dec-2021 Bendahara Pengeluaran 17.365.800 100% 17.365.800,00 14.237 1.219,76 (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta 319 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028249 29-Dec-2021 Bendahara Pengeluaran 24.697.299 100% 24.697.299,00 14.265 1.731,32 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta 320 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027966 29-Dec-2021 Bendahara Pengeluaran 2.050.000 100% 2.050.000,00 14.265 143,71 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 321 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027968 29-Dec-2021 Bendahara Pengeluaran 16.803.796 100% 16.803.796,00 14.265 1.177,97 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 322 Component 1 Pertanggungjawaban TUP untuk keperluan belanja modal LIPI 210881701028506 30-Dec-2021 Bendahara Pengeluaran 107.350.900 100% 107.350.900 14.269 7.523,37 (PHLN,COREMAP, 051) dari BP Pusat Jakarta 323 Component 1 Penggantian uang persediaan untuk keperluan belanja LIPI 210881701028478 30-Dec-2021 Bendahara Pengeluaran 18.482.500 100% 18.482.500 14.269 1.295,29 barang (PHLN, COREMAP,051) dari BP Pusat Jakarta 324 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701029685 3-Jan-2022 Bendahara Pengeluaran 378.357.834 100% 378.357.834 14.278 26.499,36 barang (PHLn,COREMAP, 051) dari BP Pusat Jakarta 325 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881303015225 4-Oct-21 2447/PPK/IV/PK/KU/9/2021 PT Karya Mentari Seraya 2.512.429.500 100% 2.512.429.500 14.096 178.237,05 berupa pembayaran Uang muka pengadaan belanja tanggal 3 September 2021 modal peralatan dan mesin berupa interior Laboratorium Gedung pusat data nasional ekosistem pesisir 326 Component 1 Pembayaran Belanja Barang berupa pembayaran 210881301018110 7-Oct-21 Bendahara Pengeluaran 284.697.000,00 100% 284.697.000,00 14.096 20.197,01 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan sertifikasi kompetensi skema penilai kondisi padang lamun dan komunitas mangrove (Triyono) di UMRAH - Tanjung Pinang 327 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 210881301019527 22-Oct-2021 Bendahara Pengeluaran 108.339.000,00 100% 108.339.000,00 14.165 7.648,36 berupa perjalanan dinas dalam rangka Melaksanakan kegiatan sertifikasi kompetensi skema Penilaian Komunitas Mangrove di Univ. Trunojoyo Madura 328 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881303016807 19-Oct-2021 0079/GTP/X/2021 tanggal 4 CV Graha Tri Putra 49.500.000,00 100% 49.500.000,00 14.165 3.494,53 berupa Pengadaan Jasa Pembuatan Aplikasi MonMang Oktober 2021 2.0 versi iOS sesuai dengan kwitansi Nomor 0079/GTP/X/2021 tanggal 4 Oktober 2021 329 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881302015386 25-Oct-2021 2364/PPK/IV/PK/KU/8/20 PT. Interkineksi Izzi Konsultan 76.075.000,00 76.075.000,00 14.165 5.370,63 berupa Pembayaran Jasa Konsultansi Pekerjaan Perencanaan Interior Desain Gedung Pulau Pari dan Ruang Kepala Organisasi Riset Kebumian Deputi Bidang IPK LIPI 330 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,015) 210881303017252 25-Oct-2021 2571/PPK/IV/PK/KU/9/2021 PT. Bhinneka Mentari Dimensi 15.454.545,00 15.454.545,00 14.165 1.091,04 berupa E-Purchasing Pengadaan Belanja Modal Peralatan Tanggal 8 September 2021 dan Mesin Berupa UPS 3KVA, sesuai Surat Pesanan Nomor 2571/PPK/IV/PK/KU/9/2021 Tanggal 8 September 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 331 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301002376 4 Maret 2021 Bendahara Pengeluaran 71.729.828,59 100% 71.729.828,59 14.371 4.991,29 Barang (PHLN-COREMAP) Dari Bendahara Pengeluaran (Jakarta) 332 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301002569 5 Maret 2021 Bendahara Pengeluaran 50.399.959,26 100% 50.399.959,26 14.371 3.507,06 Perjalanan Dinas (PHLN-COREMAP) dalam rangka Melakukan kegiatan Dinamika Karbon Perairan Ekosistem Pesisir pada Pulau dengan Variabilitas Genesis dan Kondisi Lingkungan di Lombok 333 Component 2 Pembayaran Belanja Barang (PHLN-COREMAP) berupa LIPI 210881301002305 3 Maret 2021 Bendahara Pengeluaran 31.250.026,92 100% 31.250.026,92 14.371 2.174,52 pembayaran perjalanan dinas dalam rangka pelaksanaan FGD kick Off Coremap Legacy Study dan keterbacaan kuisioner asesmen potensi dampak COREMAP CTI,ke Bogor, tanggal3- 5 Maret 2021 334 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301002844 10 Maret 2021 Bendahara Pengeluaran 45.500.036,04 100% 45.500.036,04 14.418 3.155,78 perjalanan dinas (PHLN- COREMAP) dalam rangka Kegiatan Penelitian Ketahanan Wilayah Pesisir Jawa Utara terhadap Bahaya Amblesan Tanah tanggal 15 - 26 Maret 2021 di Pekalongan 335 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301002966 12 Maret 2021 Bendahara Pengeluaran 33.381.995,40 100% 33.381.995,40 14.418 2.315,30 Barang (PHLN- COREMAP-052), Dari Bendahara Pengeluaran (Jakarta) 336 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301002916 12 Maret 2021 Bendahara Pengeluaran 31.780.011,42 100% 31.780.011,42 14.418 2.204,19 Perjalanan Dinas (PHLN- COREMAP-052) dalam rangka Melakukan kegiatan Evaluasi Tingkat Penyerapan dan Pelepasan Karbon dari Budidaya Makroalga Menggunakan Pendekatan Life Cycle Assessment (LCA) 337 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301003388 18 Maret 2021 Bendahara Pengeluaran 29.649.087,00 100% 29.649.087,00 14.412 2.057,25 Barang (PHLN,COREMAP,052), dari BPP.1 (Ambon) 338 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301003775 24 Maret 2021 Bendahara Pengeluaran 24.390.048,56 100% 24.390.048,56 14.446 1.688,36 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan RISET COREMAP CTI 2021-2022, di Sumbawa, Nusa Tenggara Barat, tanggal 5 s.d. 8 April 2021 339 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004168 31 Maret 2021 Bendahara Pengeluaran 71.452.781,96 100% 71.452.781,96 14.572 4.903,43 Barang (PHLN,COREMAP,052) dari BP Pusat Jakarta 340 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004195 1-Apr-2021 27.029.945,30 100% 27.029.945,30 14.533 1.859,90 Barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20020 Tanggal 31 Maret 2021 341 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301004342 5-Apr-2021 206.681.928,37 100% 206.681.928,37 14.533 14.221,55 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan Riset Peningkatan Kapasitas COREMAP CTI LIPI tahun 2021/2022 tanggal 03 s.d. 09 April 2021 di Prov. Nusa Tenggara Barat 342 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004466 6-Apr-2021 57.366.441,03 100% 57.366.441,03 14.533 3.947,32 Barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20022 Tanggal 6 April 2021 343 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004796 9-Apr-2021 13.186.627,68 100% 13.186.627,68 14.631 901,28 Barang (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20027 Tanggal 9 April 2021 344 Component 2 Pertanggungjawaban TUP untuk pembayaran Belanja LIPI 210881701002861 13-Apr-2021 225.379.874,37 100% 225.379.874,37 14.631 15.404,27 Barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20030 Tanggal 12 April 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 345 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002665 9-Apr-2021 40.579.956,36 100% 40.579.956,36 14.631 2.773,56 barang (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20028 Tanggal 9 April 2021 346 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002864 13-Apr-2021 120.959.597,85 100% 120.959.597,85 14.631 8.267,35 barang (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20033 Tanggal 12 April 2021 347 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002860 13-Apr-2021 185.467.237,92 100% 185.467.237,92 14.631 12.676,32 barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20035 Tanggal 12 April 2021 348 Component 2 Pertanggungjawaban TUP untuk Keperluan Belanja LIPI 210881701002956 14-Apr-2021 25.473.711,72 100% 25.473.711,72 14.633 1.740,84 Barang (PHLN,COREMAP,052) dari BPP.1 P2LD Ambon, Sesuai SPP Nomor 20036 Tanggal 14 April 2021 349 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002963 15-Apr-2021 41.448.996,81 100% 41.448.996,81 14.633 2.832,57 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20042 Tanggal 15 April 2021 350 Component 2 Pertanggungjawaban TUP untuk Keperluan Belanja LIPI 210881701002958 14-Apr-2021 43.951.971,46 100% 43.951.971,46 14.633 3.003,62 Barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20038 Tanggal 14 April 2021 351 Component 2 Penggantian Uang Persediaan untuk keperluan belanja LIPI 210881301005302 19-Apr-2021 39.364.991,64 100% 39.364.991,64 14.508 2.713,33 barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20043 Tanggal 16 April 2021 352 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301005590 22-Apr-2021 30.309.931,70 100% 30.309.931,70 14.549 2.083,30 perjalanan dinas (PHLN,COREMAP,052) dalam rangka mengikuti kegiatan Pengambilan data Riset Penguatan Kapasitas (RPK) COREMAP CTI tahun 2021 di kota Merauke, tanggal 26 April s.d. 2 Mei 2021 353 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301005927 27-Apr-2021 59.878.400,52 100% 59.878.400,52 14.489 4.132,68 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta Sesuai SPP Nomor 20045 Tanggal 27 April 2021 354 Component 2 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881303004783 28-Apr-2021 0426/PPK/IV/PK/KU/3/2021 CV. FAJAR LAKSANA 64.760.016,30 100% 64.760.016,30 14.510 4.463,13 Pengadaan (PHLN,COREMAP ,052) Bahan Penelitian Tanggal 22 Maret 2021 Optimasi Performa Produksi Benih Teripang Pasir Melalui Rekayasa Wadah dan Pakan Koordinator Lisa Fajar Indriana BBIL LIPI, 355 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881303004781 28-Apr-2021 081/FKH/IF/04/2021 tanggal CV. Kharisma Scientific 42.280.979,20 100% 42.280.979,20 14.510 2.913,92 Pengadaan bahan Penelitian (PHLN,COREMAP,052) 16 April 2021 Penilaian Risiko Ikan Asing Invasif di Daerah Aliran Sungai dan Estuari Studi Kasus: DAS Ciliwung dan Kawasan Konservasi Mangrove Muara Angke Koord. Rahmi Dina P2L LIPI 356 Component 2 Penggantian UP Untuk Keperluan Belanja barang LIPI 210881301006504 4-May-2021 47.286.257,52 100% 47.286.257,52 14.467 3.268,56 (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20051 Tanggal 4 Mei 2021 357 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301007248 11-May-2021 11.002.456,14 100% 11.002.456,14 14.198 774,93 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20059 Tanggal 11 Mei 2021 358 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301006872 6-May-2021 28.026.568,04 100% 28.026.568,04 14.198 1.973,98 (PHLN,COREMAP,052) dari Bendahara Pengeluaran Pusat - Jakarta, Sesuai SPP Nomor 20053 Tanggal 5 Mei 2021 359 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007147 10-May-2021 68.239.989,38 100% 68.239.989,38 14.198 4.806,31 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Survei lapangan ke Kawasan Segara Anakan Cilacap tanggal 19 Mei s.d 25 Mei 2021, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 360 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301006968 7-May-2021 36.487.156,24 100% 36.487.156,24 14.198 2.569,88 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20054 Tanggal 7 Mei 2021 361 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301007320 17-May-2021 82.740.002,59 100% 82.740.002,59 14.203 5.825,53 perjalanan dinas (PHLN,COREMAP,052) dalam rangka penelitian lapangan kegiatan Coral Reef Rehabilitation and Management Program-Coral Triangle Initiative Project tanggal 24 Mei s.d. 7 Juni 2021 362 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005433 17-May-2021 4.223.972,20 100% 4.223.972,20 14.203 297,40 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20062 Tanggal 17 Mei 2021 363 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005436 17-May-2021 55.859.972,91 100% 55.859.972,91 14.203 3.932,97 barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20064 Tanggal 17 Mei 2021 364 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007540 19-May-2021 207.872.951,00 100% 207.872.951,00 14.300 14.536,57 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Kegiatan Riset Pengembangan Kapasitas Coremap CTI ke Pulau Rote , Nusa Tenggara Timur sesuai dengan Surat Tugas Nomor 3415/II/TU.01.01/4/2021, 365 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005474 18-May-2021 45.545.786,00 100% 45.545.786,00 14.300 3.185,02 barang (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20067 Tanggal 17 Mei 2021 366 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301007997 27-May-2021 16.654.264,20 100% 16.654.264,20 14.310 1.163,82 (PHLN,COREMAP,052) dari BPP1.AMbon, Sesuai SPP Nomor 20071 Tanggal 25 Mei 2021 367 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007996 27-May-2021 23.240.012,40 100% 23.240.012,40 14.310 1.624,04 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti survei kegiatan Riset Pengembangan Kapasitas Program Rehabilitasi dan Pengelolaan Terumbu Karang, Inisiatif Segitiga Karang 368 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881303006825 28-May-2021 037/AS/FK/V/2021 Tanggal 24 CV. Aneka Sarana 41.916.995,10 100% 41.916.995,10 14.310 2.929,21 berupa Pengadaaan bahan Penelitian Isolasi dan Mei Karakterisasi Mikroba Patogenik pada Sidat (Anguilla spp) 2021 Hasil Tangkapan Asal Pesisir Sungai CImandiri, Kab. Sukabumi, Jawa Barat 369 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301008902 8-Jun-2021 14.000.007,06 100% 14.000.007,06 14.262 981,63 perjalanan dinas (PHLN,COREMAP,052) dalam rangka mengikuti kegiatan Riset Pengembangan Kapasitas Program Rehabilitasi di Kabupaten Sukabumi pada tanggal 9 s.d. 13 Juni 2021 370 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301009075 9-Jun-2021 18.748.967,82 100% 18.748.967,82 14.262 1.314,61 (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20079 Tanggal 9 Juni 2021 371 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301009425 15-Jun-2021 61.092.023,20 100% 61.092.023,20 14.222 4.295,60 perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti kegiatan Riset Pengembangan Kapasitas COREMAP-CTI Tahun Anggaran 2021, di Kabupaten Paser Kalimantan Timur, tanggal 20 s.d. 26 Juni 2021 372 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301009240 11-Jun-2021 18.450.058,38 100% 18.450.058,38 14.222 1.297,29 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti survei kegiatan riset pengembangan kapasitas dengan judul Eksplorasi Mikroorganisme Perairan Teluk Jakarta 1 2 3 4 5 6 7 8 9 10 11 12 13 14 373 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881303007859 11-Jun-2021 31/KW/CVGS/V/2021 tanggal CV. Gina Sejahtera 22.637.441,84 100% 22.637.441,84 14.222 1.591,72 berupa Pembayaran Pengadaan bahan pemeliharaan dan 31 Mei 2021 perlengkapan analisis untuk kegiatan penelitian makroalga sebagai pakan dan sumber antioksidan, sesuai dengan kwitansi nomor: 31/KW/CVGS/V/2021 374 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701008210 17-Jun-2021 117.634.556,83 100% 117.634.556,83 14.453 8.139,11 Barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20087 Tanggal 17 Juni 2021 375 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008267 18-Jun-2021 29.991.709,36 100% 29.991.709,36 14.453 2.075,12 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20089 Tanggal 18 Juni 2021 376 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008211 17-Jun-2021 72.613.028,24 100% 72.613.028,24 14.453 5.024,08 barang (PHLN,COREMAP, 052) dari BPP3. Bandung, Sesuai SPP Nomor 20088 Tanggal 17 Juni 2021 377 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008429 21-Jun-2021 7.512.235,81 100% 7.512.235,81 14.453 519,77 barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20093 Tanggal 18 Juni 2021 378 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008431 21-Jun-2021 84.826.391,36 100% 84.826.391,36 14.453 5.869,12 Barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20096 Tanggal 18 Juni 2021 379 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008432 18-Jun-2021 8.430.001,31 100% 8.430.001,31 14.453 583,27 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20097 Tanggal 18 Juni 2021 380 Component 2 Penggantian UP untuk keperluan Belanja barang LIPI 210881301010248 22-Jun-2021 16.499.978,39 100% 16.499.978,39 14.453 1.141,63 (PHLN,COREMAP,052) dari BPP.1 Ambon, Sesuai SPP Nomor 20098 Tanggal 22 Juni 2021 381 Component 2 Penggantian UP untuk keperluan Belanja barang LIPI 210881301010486 25-Jun-2021 52.020.472,32 100% 52.020.472,32 14.472 3.594,56 (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20102 Tanggal 25 Juni 2021 382 Component 2 Penggantian UP Untuk Keperluan Belanja Barang LIPI 210881301010765 01/07/2021 Bendahara Pengeluaran 18.645.000,00 100% 18.645.000,00 14.482 1.287,46 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20122 Tanggal 4 Agustus 2021 383 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701009421 02/07/2021 Bendahara Pengeluaran 65.607.544,00 100% 65.607.544,00 14.482 4.530,28 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20104 Tanggal 2 Juli 2021 384 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301011484 09/07/2021 Bendahara Pengeluaran 7.690.109,00 100% 7.690.109,00 14.548 528,60 (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20106 Tanggal 9 Juli 202 385 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301011643 13/07/2021 Bendahara Pengeluaran 52.590.000,00 100% 52.590.000,00 14.486 3.630,40 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan Riset Pengembangan Kapasitas Coremap CTI dengan judul Evaluasi Tingkat Penyerapan dan Pelepasan Karbon dari Budidaya Makroalga 386 Component 2 Pertanggungjawaban TUP untuk Keperluan belanja LIPI 210881701010185 15/07/2021 Bendahara Pengeluaran 117.519.180,00 100% 117.519.180,00 14.493 8.108,69 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20108 Tanggal 14 Juli 2021 387 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701010385 19/07/2021 Bendahara Pengeluaran 47.152.600,00 100% 47.152.600,00 14.524 3.246,53 Barang (PHLN,COREMAP, 052) dari BPP.3 Bandung, Sesuai SPP Nomor 20109 Tanggal 16 Juli 2021 388 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010848 27/07/2021 Bendahara Pengeluaran 89.667.990,00 100% 89.667.990,00 14.494 6.186,57 barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20112 Tanggal 26 Juli 2021 389 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701011067 29/07/2021 Bendahara Pengeluaran 32.836.434,00 100% 32.836.434,00 14.498 2.264,89 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung, Sesuai SPP Nomor 20117 Tanggal 28 Juli 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 390 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010935 28/07/2021 Bendahara Pengeluaran 32.499.600,00 100% 32.499.600,00 14.498 2.241,66 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20115 Tanggal 27 Juli 2021 391 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010929 28/07/2021 Bendahara Pengeluaran 222.719.580,00 100% 222.719.580,00 14.498 15.362,08 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20113 Tanggal 26 Juli 2021 392 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701011068 29/07/2021 Bendahara Pengeluaran 71.643.655,00 100% 71.643.655,00 14.498 4.941,62 barang (PHLN,COREMAP, 052) dari BPP.5 P2O jakarta, Sesuai SPP Nomor 20118 Tanggal 28 Juli 2021 393 Component 2 Penggantian UP Untuk Keperluan Belanja Barang LIPI 210881301013166 05/08/2021 Bendahara Pengeluaran 13.515.600,00 100% 13.515.600,00 14.342 942,38 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20122 Tanggal 4 Agustus 2021 394 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881303010910 05/08/2021 Kuitansi Nomor: 063/KW- PT FIRST MEDIA NEWS 49.900.000,00 100% 49.900.000,00 14.342 3.479,29 berupa Pembayaran Pengadaan Jasa Media Campaign KL/VII/2021 tanggal 30 Juli Talk Show Untuk Kegiatan Diseminasi Coremap CTI, 2021 sesuai Kuitansi Nomor: 063/KW-KL/VII/2021 tanggal 30 Juli 2021 395 Component 2 Pembayaran Belanja Barang LIPI 210881303010924 05/08/2021 0921/PPK/IV/PK/KU/4/2 021 CV. SUBUR KARYA 116.321.000,00 100% 116.321.000,00 14.342 8.110,51 (PHLN,COREMAP,052)berupa Pembayaran Pengadaan tanggal 29 April 2021 Bahan Penelitian Pemetaan Distribusi dan Kelimpahan sidat (Anguilla spp.) dengan teknologi eDNA sebagai dasar konservasi sidat di kawasan segara anakan Cilacap 396 Component 2 Penggantian UP Untuk Keperluan Belanja Barang LIPI 210881301013982 16/08/2021 Bendahara Pengeluaran 15.796.007,00 100% 15.796.007,00 14.383 1.098,24 (PHLN,COREMAP,052) dari BPP.1 Ambon, Sesuai SPP Nomor 20124 Tanggal 13 Agustus 2021 397 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301014282 19/08/2021 Bendahara Pengeluaran 23.400.000,00 100% 23.400.000,00 14.415 1.623,31 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan riset pengembangan kapasi tas COREMAP CTI dengan Judul Karakterisasi Sedimen Organik Perairan Rentan Hypoxia di Teluk Semarang 398 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701012796 26/08/2021 Bendahara Pengeluaran 36.402.000,00 100% 36.402.000,00 14.408 2.526,51 Barang (PHLN,COREMAP, 052) dari BPP.4 Mataram, Sesuai SPP Nomor 20132 Tanggal 25 Agustus 2021 399 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701012795 26/08/2021 Bendahara Pengeluaran 13.200.000,00 100% 13.200.000,00 14.408 916,16 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram, Sesuai SPP Nomor 20131 Tanggal 25 Agustus 2021 400 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013076 30/08/2021 Bendahara Pengeluaran 195.381.300,00 100% 195.381.300,00 14.374 13.592,69 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20137 Tanggal 30 Agustus 2021 401 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013074 30/08/2021 Bendahara Pengeluaran 45.658.364,00 100% 45.658.364,00 14.374 3.176,45 barang (PHLN,COREMAP. 052) dari BP Pusat Jakarta, 402 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301015049 31/08/2021 Bendahara Pengeluaran 12.020.000,00 100% 12.020.000,00 14.374 836,23 (PHLN,COREMAP,052), dari BPP.4 Mataram 403 Component 2 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301015554 06/09/2021 Bendahara Pengeluaran 45.500.000,00 100% 45.500.000,00 14.261 3.190,52 perjalanan dinas (PHLN, COREMAP,052) dalam rangka kegiatan penelitian Ketahan Wilayah Pesisir Jawa Utara terhadap Ambiens Tanah di Kota Pekalongan, tanggal 14- 25 September 2021 404 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301015404 03/09/2021 Bendahara Pengeluaran 20.879.800,00 100% 20.879.800,00 14.261 1.464,12 (PHLN,COREMAP,052) dari BPP.1 Ambon 405 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013974 10/09/2021 Bendahara Pengeluaran 222.358.754,00 100% 222.358.754,00 14.272 15.580,07 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 1 2 3 4 5 6 7 8 9 10 11 12 13 14 406 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301015705 08/09/2021 Bendahara Pengeluaran 55.140.000,00 100% 55.140.000,00 14.272 3.863,51 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Melakukan penelitian lapangan ke Kabupaten Cirebon tanggal 14 s.d. 26 September 2021 407 Component 2 Pembayaran Belanja barang berupa pembayaran LIPI 210881301015866 10/09/2021 Bendahara Pengeluaran 109.185.000,00 100% 109.185.000,00 14.272 7.650,29 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Mengikuti Prasurvei dan Survei kegiatan Riset Unggulan COREMAP CTI di Kota Manado, Provinsi Sulawesi Utara, tanggal 13 s.d.23 September 2021 408 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301015756 08/09/2021 Bendahara Pengeluaran 40.392.000,00 100% 40.392.000,00 14.272 2.830,16 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan Riset Pengembangan Kapasi tas COREMAP CTI di Teluk Wediombo Gunung Kidul, Provinsi DI Yogyakarta 409 Component 2 enggantian UP untuk keperluan belanja barang LIPI 210881301015669 08/09/2021 Bendahara Pengeluaran 10.430.000,00 100% 10.430.000,00 14.272 730,80 (PHLN,COREMAP,052) dari BPP.4 Mataram, 410 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301017045 24-Sep-2021 Bendahara Pengeluaran 8.535.226,00 100% 8.535.226,00 14.155 602,98 (PHLN,COREMAP, 052) dari BPP.4 Mataram 411 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302013618 29-Sep-2021 No 30/CV-SJM/K/IX/2021 CV. SABET JAYA MANDIRI 47.951.000,00 100% 47.951.000,00 14.155 3.387,57 berupa Pembayaran Pengadaan Bahan pelatihan CTI tanggal 24 September 2021 Pemantauan Komunitas Mangrove dan Lamun TUK UMRAH, sesuai Kwitansi No 30/CV-SJM/K/IX/2021 tanggal 24 September 2021 412 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016138 14-Sep-2021 Bendahara Pengeluaran 51.510.000,00 100% 51.510.000,00 14.155 3.639,00 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan pengambilan data penelitian riset unnggulan tahun 2021 tanggal 16 s.d. 22 September 2021 di Kabupaten Lombok Tengah NTB 413 Component 2 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301016830 22-Sep-2021 Bendahara Pengeluaran 466.007.130,00 100% 466.007.130,00 14.096 33.059,53 perjalanan dinas (PHLN, COREMAP,052) dalam rangka mengikuti kegiatan RHM COREMAP di Kalimantan Timur (Susi Rahmawati) 414 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016818 21-Sep-2021 Bendahara Pengeluaran 448.196.000,00 100% 448.196.000,00 14.096 31.795,97 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Menghadiri koordinasi dan pelaksanaan Pelati han Penilai Kondisi Terumbu Karng Biodiversitas Ikan Karang di Universitas Udayana Bali 415 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302013609 29-Sep-2021 K038PB092021, tanggal 9 CV. PASUNDAN BIOTECH 31.693.000,00 100% 31.693.000,00 14.165 2.237,420 berupa Pembayaran Pengadaan bahan kimia (indent) September 2021 Kegiatan Kultivasi Mikroalga Berprotein tinggi spirulina maxima menggunakan media limbah organik 416 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301016784 21-Sep-2021 Bendahara Pengeluaran 6.445.800,00 100% 6.445.800,00 14.165 455,05 (PHLN,COREMAP,052) dari BP Pusat Jakarta 417 Component 2 Pembayaran belanja barang berupa pembayaran LIPI 210881301018239 8-Oct-2021 Bendahara Pengeluaran 29.700.000,00 100% 29.700.000,00 14.165 2.096,72 perjalanan dinas (PHLN, COREMAP,052) dalam rangka melakukan penelitian dan pengujian sampel di laboratorium penelitian dan pengujian terpadu UGM, 418 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017300 28-Sep-2021 Bendahara Pengeluaran 89.190.000,00 100% 89.190.000,00 14.165 6.296,51 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka survey dinamika Sedimentasi Muara Batanghari dan Dampaknya Terhadap Ekosistem Pesisir di Jambi (Iwan.R) 419 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015798 4-Oct-2021 Bendahara Pengeluaran 76.602.833,00 76.602.833,00 14.165 5.407,90 barang (PHLN,COREMAP, 052,053) dari BPP.1 Ambon 1 2 3 4 5 6 7 8 9 10 11 12 13 14 420 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301018367 11-Oct-2021 Bendahara Pengeluaran 19.385.169,00 19.385.169,00 14.165 1.368,53 (PHLN,COREMAP,052) Cofunding, dari BPP.4 Mataram, 421 Component 2 Pembayaran belanja barang berupa pembayaran LIPI 210881301018125 7-Oct-2021 Bendahara Pengeluaran 94.824.000,00 94.824.000,00 14.165 6.694,25 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Melaksanakan kegiatan Pelatihan Pemantau Ekosistem Mangrove di Universitas Trunodjoyo Madura tanggal 16 s.d. 24 Oktober 2021 422 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881303017314 26-Oct-2021 2054/PPK/IV/PK/KU/8/2021 CV. Aneka Sarana 96.617.000,00 100% 96.617.000,00 14.165 6.820,83 berupa Pengadaan Bahan Kegiatan Pencemaran tanggal 12 Agustus 2021 Mikroplastik Perairan Danau Urban Jakarta dan Sekitarnya yang bermuara di teluk Jakarta Koordinator Tri Suryono P2L 423 Component 2 Pembayaran Belanja Barang Berupa pembayaran LIPI 210881301017339 29-Sep-2021 Bendahara Pengeluaran 23.375.000,00 100% 23.375.000,00 14.165 1.650,19 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Survei Lapangan ke Kabupaten Lebak, Banten tanggal 28 September s.d 03 Oktober 2021 424 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881303015468 5-Oct-2021 028/KW/IX/21 tanggal 28 CV General Labora 14.761.100,00 100% 14.761.100,00 14.165 1.042,08 berupa Pembayaran Pengadaan Bahan Kimia (Indent) September 2021 kegiatan Potensi Alginat dari Mikroalga Laut sebagai Bahan Baku Nanoenkapsulan (Cofunding MALSAI) sesuai kwitansi No 028/KW/IX/21 tanggal 28 September 2021 425 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co LIPI 210881303013972 15-Sep-2021 195/KW-MHM/IX/2021 tanggal CV.MARGANA HITA MANDIRI 28.040.000,00 100% 28.040.000,00 14.165 1.979,53 funding berupa Pembayaran Pengadaaan bahan Kimia 9 September 2021 Kegiatan Teknologi Fotobioreaktor untuk Mikroalga sebagai wahana Biomass Generator dan CO2, 426 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301018669 13-Oct-2021 Bendahara Pengeluaran 187.041.000,00 100% 187.041.000,00 14.165 13.204,45 berupa Perjalanan Dinas dalam rangka Melaksanakan kegiatan lapangan Studi Perubahan Spasial dan Temporal Tutupan Mangrove di Laguna Segara Anakan, Cilacap, Jawa Tengah 427 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301018625 13-Oct-2021 Bendahara Pengeluaran 10.670.000,00 100% 10.670.000,00 14.165 753,27 Perjalanan Dinas(PHLN, COREMAP,052) dalam rangka melakukan analisis sampel hasil penelitian di BATAN Jakarta tanggal 18 s.d. 19 Oktober 2021, 428 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016137 14-Sep-2021 Bendahara Pengeluaran 45.372.000,00 100% 45.372.000,00 14.165 3.203,11 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan Studi Budidaya dan Pengem bangan Teknik Reproduksi Aseksual Pada Karang Hias tanggal 13 s.d. 17 September 2021 di Banyuwangi 429 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co LIPI 210881303014098 16-Sep-2021 112/CKP/K/IX/2021 tanggal 10 CV. CIPTA KARYA PERDANA 43.431.000,00 100% 43.431.000,00 14.165 3.066,08 Funding, berupa Pembayaran Pengadaaan bahan Kimia September 2021 Kegiatan Teknologi Fotobioreaktor untuk Mikroalga sebagai wahana Biomass Generator dan CO2 430 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015361 29-Sep-2021 Bendahara Pengeluaran 40.090.000,00 100% 40.090.000,00 14.165 2.830,22 barang (PHLN,COREMAP. 052) dari BP Pusat Jakarta 431 Component 2 Pertanggungjawaban TUP untuk Keprluan Belanja Barang LIPI 210881701015316 29-Sep-2021 Bendahara Pengeluaran 100.220.857,00 100% 100.220.857,00 14.165 7.075,25 (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, 432 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302013574 28-Sep-2021 2681/PPK/IV/PK/KU/IX/9/2021 PT KEMIKO SAVITRI SEJAHTERA 82.410.000,00 100% 82.410.000,00 14.165 5.817,86 berupa pembayaran Pengadaan Paket Meeting dalam tanggal 13 September 2021 rangka WOrkshop Revisi Program dan Perencanaan kegiatan Coremap CTI Tahun 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 433 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co LIPI 210881303013976 15-Sep-2021 025/INV/PT.MED/09/2021 PT MEDRAY 47.541.000,00 100% 47.541.000,00 14.165 3.356,23 Funding, berupa Pembayaran Pengadaan Glass Wares tanggal 07 September 2021 dan Perlengkapan Laboratorium dalam rangka kegiatan pengembangan desain fotobioreaktor untuk produksi biomassa mikroalga anthospira (Spirulina) 434 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301018628 13-Oct-2021 Bendahara Pengeluaran 51.676.000,00 100% 51.676.000,00 14.165 3.648,15 berupa Perjalanan dinas dalam rangka Mengikuti Kegiatan Asesmen Simpul Data Pemantauan Ekosist em Pesisir di Pekanbaru (Bayu P), dan Pengambilan data lapangan untuk Penelitian Model transportasi 435 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301018626 13-Oct-2021 Bendahara Pengeluaran 22.842.700,00 100% 22.842.700,00 14.165 1.612,62 (PHLN,COREMAP,052) dari BPP.1 Ambon 436 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016764 21-Sep-2021 Bendahara Pengeluaran 32.148.000,00 100% 32.148.000,00 14.165 2.269,54 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Survei Lapangan ke Kawasan Segara Anakan Cilacap (Sekar Larashati) dan Survei dan Pengukuran Lapangan Kuantitas Kualitas Perairan di DAS di Konawe 437 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015596 30-Sep-2021 Bendahara Pengeluaran 50.141.911,00 100% 50.141.911,00 14.165 3.539,85 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 438 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015539 30-Sep-2021 Bendahara Pengeluaran 99.855.000,00 100% 99.855.000,00 14.165 7.049,42 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 439 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881301019131 18-Oct-2021 Bendahara Pengeluaran 228.638.000,00 100% 228.638.000,00 14.165 16.141,05 berupa perjalanan dinas dalam rangka Pengambilan Sampel air,sedimen dan ikan di Teluk banten (Sugiarti), dan survei lapangan di kab. Garut-JABAR (Asep sandra) dan di Kab. Banggai-SULTENG 440 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015315 29-Sep-2021 Bendahara Pengeluaran 77.007.127,00 100% 77.007.127,00 14.165 5.436,44 Barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong 441 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302014936 18-Oct-2021 2887/PPK/IV/PK/KU/9/2021 CV Inovasi Multi Kreasi 101.175.000,00 100% 101.175.000,00 14.165 7.142,61 berupa Pengadaan Bahan Pelatihan CTI Pemantauan Ikan tanggal 29 September 2021 Karang, Terumbu Karang dan Megabenthos TUK UBH sesuai SPK No: 2887/PPK/IV/PK/KU/9/2021 tanggal 29 September 2021 442 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017071 24-Sep-2021 Bendahara Pengeluaran 193.853.000,00 100% 193.853.000,00 14.165 13.685,35 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Validasi dan Indepth Interview Palaku Kunci COREMAP CTI (Aan Johan), Survei dan Pengukuran Lapangan Kuantitas dan dan Kualitas Perairan di DAS 443 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302013418 24-Sep-2021 61/KPF/K/IX/2021 tanggal 22 CV. KING PREMIER FAMILY 18.968.000,00 100% 18.968.000,00 14.165 1.339,08 berupa Pengadaan Bahan Workshop sinkronisasi dan September 2021 Pemutakhiran data pemantauan terumbu karang dan ekosistem terkait lainnya 444 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701014369 15-Sep-2021 Bendahara Pengeluaran 11.947.700,00 100% 11.947.700,00 14.165 843,47 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 445 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301016491 17-Sep-2021 Bendahara Pengeluaran 27.007.250,00 100% 27.007.250,00 14.165 1.906,62 (PHLN,COREMAP,052) dari BPP.3 Bandung, 446 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301018089 7-Oct-2021 Bendahara Pengeluaran 19.062.221,00 100% 19.062.221,00 14.165 1.345,73 (PHLN,COREMAP,052) COfunding, dari BPP.4 Mataram 447 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302015447 26-Oct-2021 75/KPF/K/10/2021 tanggal 22 CV. King Premier Family 46.953.000,00 100% 46.953.000,00 14.165 3.314,72 berupa pengadaan bahan training internasional Oktober 2021, Mangrove Monitoring RTRC MarBEST 2021 Koordinator I Wayan EKa Dharmawan LIPI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 448 Component 2 Pembayaran Belanja Barang (PHN,COREMAP,052) berupa LIPI 210881303017319 26-Oct-2021 1971/PPK/IV/PK/KU/7/2021 PT Mitra Utama Varia 91.015.000,00 100% 91.015.000,00 14.165 6.425,34 Pengadaan bahan Penelitian Rekayasa Energi Gelombang tanggal 22 Juli 2021 dan Iklim Mikro Wilayah Pesisir dalam Meningkatkan Produktifitas Kultur Mikroalga Arthospira platensis Koordinator Dr. Nofdianto P2L LIPI 449 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301019526 22-Oct-2021 Bendahara Pengeluaran 130.417.800,00 100% 130.417.800,00 14.165 9.207,05 berupa perjalanan dinas dalam rangka menghadiri kordinasi dan pelaksanaan pelatihan penilaian kondisi padang lamun di Bali (Niken), dan melakukan survey RPK COREMAP CTI di Pulau Bintan 450 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301016136 14-Sep-2021 Bendahara Pengeluaran 216.750.000,00 100% 216.750.000,00 14.165 15.301,80 perjalanan dinas (PHLN, COREMAP,052) dalam rangka mengikuti Workshop Revisi Program Kegiatan Coremap CTI 2021, di Semarang tanggal 12 s.d. 16 September 2021, 451 Component 2 Penggantian Uang persediaan untuk keperluan belanja LIPI 210881301017446 30-Sep-2021 Bendahara Pengeluaran 6.600.000,00 100% 6.600.000,00 14.165 465,94 barang (PHLN, COREMAP,052) dari BPP.4 Mataram 452 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881303014383 21-Sep-2021 060-KW/TCJ/IX/2021 tanggal PT. TRIASIH CIPTA JAYA 32.100.000,00 100% 32.100.000,00 14.165 2.266,15 berupa pembayaran pengadaan seminar kit workshop 13 September 2021 revisi program dan perencanaan kegiatan COREMAP CTI Tahun 2021, sesuai kwitansi nomor 060-KW/TCJ/IX/2021 tanggal 13 September 2021 453 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301020139 29-Oct-2021 Bendahara Pengeluaran 579.064.000 100% 579.064.000 14.261 40.604,73 berupa Perjalanan dinas dalam rangka kegiatan Pelatihan Penilaian Kondisi Padang Lamun di UNRAM Lombok NTB (Milani), Kegiatan RHM di Kepulauan Seribu (Rikoh), Reef Health Monitoring di Lampung 454 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301020438 03-Nov-21 Bendahara Pengeluaran 46.130.455,00 100% 46.130.455 14.261 3.234,73 (PHLN,COREMAP,052) dari BPP.3 Bandung 455 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302015810 01-Nov-21 8321/K/AR/X/2021 tanggal 26 CV. Anugrah Raya 26.118.000,00 100% 26.118.000 14.261 1.831,43 berupa pengadaan bahan penelitian studi Oktober 2021 keanekaragaman genetik ikan capungan banggai (Pterapo gon kauderni) di Indonesia Koordinator Ucu Yanu Arbi, sesuai kwitansi nomor 8321/K/AR/X/2021 456 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301020096 28 Oktober 2021 Bendahara Pengeluaran 37.886.812,00 100% 37.886.812 14.261 2.656,67 (PHLN,COREMAP,052) dari BPP.2 Cibinong 457 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302016432 08-Nov-21 KW-34.11.0021 tanggal 4 PT. Arena Multi Media 42.940.000 100% 42.940.000 14.268 3.009,53 berupa paket pengadaan jasa publikasi media online dan November 2021 sosial media kegiatan MonMang COREMAP CTI, Koordinator Dyah R Sugianto BKHH LIPI, sesuai dengan Kwitansi Nomor KW-34.11.0021 tanggal 4 November 2021 458 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881301021289 10-Nov-21 Bendahara Pengeluaran 125.442.000 100% 125.442.000 14.253 8.801,09 berupa perjalanan dinas kegiatan Konsinyering Pengembangan Model AI untuk Analisa Data Foto Terumbu Karang di Malang (Bambang H) dan Biologi Status Populasi dan Pemanfaatan Hiu Terancam di Mataram 459 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881302016742 11-Nov-21 76/IGP/K/XI/2021 tanggal 5 CV. Indo Graha Persada 44.146.000,00 100% 44.146.000 14.253 3.097,31 berupa pengadaan Bahan Pelatihan Penilaian Terumbu November 2021 karang dan ekosistem terkait lainnya di Universitas Mataram NTB koordinator Milani Anggiani, sesuai dengan Kwitansi Nomor 76/IGP/K/XI/2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 460 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701019622 11-Nov-21 Bendahara Pengeluaran 12.550.000,00 100% 12.550.000 14.253 880,52 barang (PHLN,COREMAP, 052) Cofunding, dari BPP.4 Mataram 461 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301021302 11-Nov-21 Bendahara Pengeluaran 6.600.000,00 100% 6.600.000 14.253 463,06 (PHLN,COREMAP,052) dari BPP.4 Mataram 462 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301021630 15-Nov-21 Bendahara Pengeluaran 61.045.600 100% 61.045.600 14.243 4.286,01 (PHLN,COREMAP,052) dari BP Pusat Jakarta, 463 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303019448 17-Nov-21 1364/PPK/IV/PK/KU/6/2021 PT. Genecraft Lab 129.000.000 100% 129.000.000 14.211 9.077,48 berupa pembayaran Pengadaan Jasa Kalibrasi dan Tanggal 2 Juni 2021 Penggantian Sparepart Peralatan Laboratorium Puslit Oseanografi berupa alat GCMS sesuai dengan SPK Nomor: 1364/PPK/IV/PK/KU/6/2021 Tanggal 2 Juni 2021 464 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701020454 16-Nov-21 Bendahara Pengeluaran 9.002.000 100% 9.002.000 14.211 633,45 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 465 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301021755 15-Nov-21 Bendahara Pengeluaran 6.796.100,00 100% 6.796.100 14.211 478,23 (PHLN,COREMAP,052) dari BPP.4 Mataram 466 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301022239 22-Nov-21 Bendahara Pengeluaran 78.730.000,00 100% 78.730.000 14.255 5.522,97 (PHL,COREMAP,052) dari BP Pusat Jakarta, 467 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021962 29-Nov-21 Bendahara Pengeluaran 110.074.047 100% 110.074.047 14.280 7.708,27 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 468 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021965 29-Nov-21 Bendahara Pengeluaran 147.434.807 100% 147.434.807 14.280 10.324,57 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 469 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301023059 29-Nov-21 Bendahara Pengeluaran 49.805.225 100% 49.805.225 14.340 3.473,17 (PHLN,COREMAP,052) dari BPP.3 Bandung 470 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881301023065 29-Nov-21 Bendahara Pengeluaran 36.200.000,00 100% 36.200.000 14.340 2.524,41 berupa pembayaran Honorarium pengajar dan asisten pengajar pelatihan penilaian kondisi padang lamun dan mangrove di Universitas Udayana Bali 471 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021966 29-Nov-21 Bendahara Pengeluaran 78.115.013,00 100% 78.115.013 14.340 5.447,35 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 472 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021968 29-Nov-21 Bendahara Pengeluaran 47.042.000,00 100% 47.042.000 14.340 3.280,47 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 473 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021964 29-Nov-21 Bendahara Pengeluaran 3.650.000,00 100% 3.650.000 14.340 254,53 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 474 Component 2 Penggantian UP untuk Keperluan Belanja Barang LIPI 210881301023182 30-Nov-21 Bendahara Pengeluaran 18.210.000,00 100% 18.210.000 14.340 1.269,87 (PHLN,COREMAP,052) dari BPP.1 Ambon 475 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301023183 30-Nov-21 Bendahara Pengeluaran 49.610.300,00 100% 49.610.300 14.340 3.459,57 (PHLN,COREMAP,052) dari BPP2 Cibinong`` 476 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301023060 29-Nov-21 Bendahara Pengeluaran 59.900.000,00 100% 59.900.000 14.340 4.177,13 (PHLN,COREMAP,052) dari BPP.5 Jakarta 477 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301022841 26-Nov-21 056/KW-BaCls/XI/2021 tanggal CV. BACLS 7.304.545,00 100% 7.304.545 14.340 509,38 cofunding berupa pembelian Fucoidan, Fucoxanthin dan 10 November 2021 EPA Nitrosamine Mix, sesuai dengan Kwitansi Nomor 056/KW-BaCls/XI/2021 tanggal 10 November 2021 478 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301023662 2-Dec-2021 Bendahara Pengeluaran 102.984.423,00 100% 102.984.423,00 14.348 7.177,62 berupa perjalanan dinas dalam rangka kegiatan pelatihan penilai kondisi komunitas mangrove dan padang lamun di universitas pattimura Ambon, tanggal 23 s.d. 30 November 2021 479 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301024279 7-Dec-2021 Bendahara Pengeluaran 13.231.600,00 100% 13.231.600,00 14.348 922,19 (PHLN,COREMAP,052) dri BPP.2 Cibinong 480 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301023885 3-Dec-2021 Bendahara Pengeluaran 31.799.000,00 100% 31.799.000,00 14.348 2.216,27 (PHLN,COREMAO,052) dari BPP2 Cibinong 1 2 3 4 5 6 7 8 9 10 11 12 13 14 481 Component 2 PErtanggungjawaban TUP untuk keperluan belanja LIPI 210881701022651 2-Dec-2021 Bendahara Pengeluaran 184.666.930,00 100% 184.666.930,00 14.348 12.870,57 barang (PHLN,COREMAP,05 2) dari BPP2 cibinong 482 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701022429 1-Dec-2021 Bendahara Pengeluaran 78.661.420,00 100% 78.661.420,00 14.348 5.482,40 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta 483 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881301023874 3-Dec-2021 Bendahara Pengeluaran 58.526.100,00 100% 58.526.100,00 14.348 4.079,04 berupa perjalanan dinas kegiatan Focus Group Discussion (FGD) dan Konsinyering Pembahasan Dokumen Kajian COREMAP Legacy Study di Bandung Jawa Barat 484 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301024303 7-Dec-2021 Bendahara Pengeluaran 37.460.700,00 100% 37.460.700,00 14.348 2.610,87 (PHLN,COREMAP,052) dari BP Pusat Jakarta 485 Component 2 pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302019487 13-Dec-2021 Kwitansi nomor CV. Putra Harapan Jaya 29.056.000,00 100% 29.056.000,00 14.378 2.020,87 berupa pengadaan bahan un tuk kegiatan sertifikasi 139/KW/PHJ/XII/2021 tanggal kompetensi skema penilai kondisi mangrove di TUK 3 Desember 2021 Universitas Hasanuddin Makasar 486 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881301024796 13-Dec-2021 2997/PPK/IV/PK/KU/10 CV. Dwi Srikandi 141.545.000,00 100% 141.545.000,00 14.378 9.844,55 berupa pengadaan Bahan kimia indent pemafaatan kulit ikan tuna sebagai sumber kolagen untuk pengembangan nutrasetikal anti inflamasi bagi penderita covid 19 487 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302019488 13-Dec-2021 kwitansi nomor PT. Elo Karsa Utama 36.533.000,00 100% 36.533.000,00 14.378 2.540,90 berupa pengadaan bahan penelitian makroalgae sebagai KWT/2122776/12/2021 tanggal pakan dan sumber antioksidan (Koodinator Idham 3 Desember 2021 Sumarto Pratama BBIL), 488 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023571 13-Dec-2021 Bendahara Pengeluaran 2.223.788,00 100% 2.223.788,00 14.378 154,67 barang (PHLN,COREMAP, 052) dari BPP4 Mataram 489 Component 2 Pertannggungjawaban TUP untuk keperluan belanja LIPI 210881701023570 13-Dec-2021 Bendahara Pengeluaran 15.262.500,00 100% 15.262.500,00 14.378 1.061,52 barang (PHLN,COREMAP, 052) Cofunding dari BPP4 Mataram 490 Component 2 Pembayaran belanja barang (PHLN, COREMAP,052) LIPI 210881303022462 13-Dec-2021 3858/PPK/IV/PK/KU/11/2021 PT. Trans News Corpora 100.000.000,00 100% 100.000.000,00 14.378 6.955,07 berupa pengadaan jasa diseminasi informasi kegiatan Tanggal 16 Nopember 2021 COREMAP-CTI melalui program Techt talk, 491 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303022576 13-Dec-2021 kwitansi nomor CV. Asking Prima Kencana 19.605.000,00 100% 19.605.000,00 14.378 1.363,54 berupa pengadaan bahan untuk kegiatan kajian legasi 057/K/CV.APK/XI/2021 tanggal Coremap CTI konsinyering analisa akhir tahun 26 November 2021. 492 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302019520 13-Dec-2021 kwitansi nomor K051PB122021 CV. Pasundan Biotech 13.150.000,00 100% 13.150.000,00 14.378 914,59 berupa pengadaan bahan Penelitian pengembagan tanggal 1 Desember 2021 mikroba Asosiasi spons sebagai biokatalis untuk mendukung teknologi farmasi, 493 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303022553 13-Dec-2021 SP nomor : SUA MST PRENEUR 49.500.000,00 100% 49.500.000,00 14.378 3.442,76 berupa pekerjaan pengadaan jasa lainnya kerjasama 3343/PPK/IV/PK/KU/10/2021 pemetaan dan pelatihan Drone Deputi ilmu pengetahuan tanggal 19 Oktober 2021 kebumian BRIN 494 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303022577 13-Dec-2021 Kwitansi nomor KW254495-NR PT. Genetika Science Indonesia 10.270.000,00 100% 10.270.000,00 14.378 714,29 berupa pengadaan bahan penelitian bioassesment tanggal 24 November 2021 terhadap pencemaran logan berat Pb dan Cd pada sedimen dan air di teluk jakarta 495 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303022465 13-Dec-2021 Invoice nomor TRJK/2111/K014 PT. Radio Trijaya Shakti 40.000.000,00 100% 40.000.000,00 14.378 2.782,03 berupa pengadaan jasa media campaign Bumi Kita untuk tanggal 6 Desember 2021 kegiatan Diseminasi Coremap CTI (Koord Dyah R Sugianto) 496 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302019526 13-Dec-2021 kwitansi nomor CV. Central Cakra Buana 30.016.000 100% 30.016.000,00 14.378 2.087,63 berupa pengadaan bahan pe latihan pemantau penilai 55/K/CV.CCB/11/2021 Tanggal komunitas mangrove dan padang lamun di Universitas 23 November 2021 pattimura 1 2 3 4 5 6 7 8 9 10 11 12 13 14 497 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302019528 13-Dec-2021 Invoice No INV/124/XI/2021 CV. Endamora Maju bersama 42.500.000,00 100% 42.500.000,00 14.378 2.955,90 berupa pengadaan jasa diseminasi informasi kegiatan tanggal 30 November 2021 coremap CTI melalui program pemberitaan LKBN Antara 498 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023687 14-Dec-2021 Bendahara Pengeluaran 316.355.172 100% 316.355.172,00 14.348 22.048,73 barang (PHLN,COREMAP, 052) dari BPP.5 P2O jakarta 499 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023691 14-Dec-2021 Bendahara Pengeluaran 703.830.082 100% 703.830.082,00 14.348 49.054,23 barang (PHLN,COREMAP, 500 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023689 14-Dec-2021 Bendahara Pengeluaran 157.974.098 100% 157.974.098,00 14.348 11.010,18 barang (PHLN,COREMAP, 052) dari BPP.5 P2) Jakarta 501 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023696 14-Dec-2021 Bendahara Pengeluaran 1.700.000 100% 1.700.000,00 14.348 118,48 barang (PHLN,SOREMAP, 052) Cofundin 502 Component 2 pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023690 14-Dec-2021 Bendahara Pengeluaran 138.259.061 100% 138.259.061,00 14.348 9.636,12 barang (PHLN,COREMAP, 052) dari BPP.1 Ambon 503 Component 2 Pertanggungjawaban TUP untuk keprluan belanja barang LIPI 210881701023695 14-Dec-2021 Bendahara Pengeluaran 151.292.132 100% 151.292.132,00 14.348 10.544,48 (PHLN,COREMAP, 052) dari BPP.3 Bandung 504 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023688 14-Dec-2021 Bendahara Pengeluaran 38.790.000 100% 38.790.000,00 14.348 2.703,51 barang (PHLN,COREMAP, 052) Cofunding Dari BP Pusat Jakarta 505 Component 2 Pembayaran belanja modal (PHLN,COREMAP,052) LIPI 210881303023458 16-Dec-2021 Kwitansi Nomor 100- PT. TRIASIH CIPTA JAYA 23.000.000 100% 23.000.000,00 14.343 1.603,57 berupa pengadaan scanner dan infokus portable KW/TCJ/XII/2021 tanggal 16 Desember 2021 506 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881301025250 16-Dec-2021 Bendahara Pengeluaran 84.056.000 100% 84.056.000,00 14.343 5.860,42 berupa perjalanan dinas Survei dan Pengukuran Lapangan Kuantitas & Kualitas Perairan di DAS & pesisir konawe sulawesi tenggara (apip) dan Jogjakarta (Tri H) 507 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303024296 27-Dec-2021 3468/PPK/IV/PK/KU/10/2021 CV. Cipta Karya Perdana 126.815.000 100% 126.815.000 14.225 8.914,94 berupa pengadaan bahan penelitiam bioassesment Tanggal 27 Oktober 2021 terhadap pencemaran logam berat Pb dan Cd pada sedimen dan air di teluk jakarta, 508 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881301025608 27-Dec-2021 1991/PPK/IV/PK/KU/7/2021 CV. Moealim Noer 110.518.000 100% 110.518.000 14.225 7.769,28 berupa pengadaan bahan penelitian analisis risiko ekologi Tanggal 30 Juli 2021 merkuri pada penambang emas skala kecil terhadap ekosistem pesisir 509 Component 2 Penggantiap UP untuk keperluan belanja barang LIPI 210881701027365 28-Dec-2021 Bendahara Pengeluaran 49.978.000 100% 49.978.000,00 14.237 3.510,43 (PHLN,COREMAP,052) dari BPP.2 Cibinong, 510 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027366 28-Dec-2021 Bendahara Pengeluaran 18.660.000 100% 18.660.000,00 14.237 1.310,67 (PHLN,COREMAP,052) cofunding dari BPP.4 Mataram 511 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027427 28-Dec-2021 Bendahara Pengeluaran 42.153.500 100% 42.153.500,00 14.237 2.960,84 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta 512 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027428 28-Dec-2021 Bendahara Pengeluaran 49.932.000 100% 49.932.000,00 14.237 3.507,20 (PHLN,COREMAP,052) dari BPP.3 Bandung 513 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027364 28-Dec-2021 Bendahara Pengeluaran 25.712.215 100% 25.712.215,00 14.237 1.806,01 (PHLN,COREMAP,052) dari BPP.1 Ambon 514 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027367 28-Dec-2021 Bendahara Pengeluaran 9.632.500 100% 9.632.500,00 14.237 676,58 (PHLN,COREMAP,052) dari BPP.4 Mataram 515 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028456 30-Dec-2021 Bendahara Pengeluaran 269.721.512 100% 269.721.512,00 14.265 18.907,92 barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong 516 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028250 29-Dec-2021 Bendahara Pengeluaran 322.649.900 100% 322.649.900,00 14.265 22.618,29 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 517 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027969 29-Dec-2021 Bendahara Pengeluaran 42.621.051 100% 42.621.051,00 14.265 2.987,81 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 1 2 3 4 5 6 7 8 9 10 11 12 13 14 518 Component 2 Pertangggungjawaban TUP untuk keperluan belanja LIPI 210881701027961 29-Dec-2021 Bendahara Pengeluaran 32.850.918 100% 32.850.918,00 14.265 2.302,90 Barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 519 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027963 29-Dec-2021 Bendahara Pengeluaran 16.307.570 100% 16.307.570,00 14.265 1.143,19 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 520 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027965 29-Dec-2021 Bendahara Pengeluaran 21.449.818 100% 21.449.818,00 14.265 1.503,67 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 521 Component 2 Pertanggungjawabann TUP untuk keperluan belanja LIPI 210881701027962 29-Dec-2021 Bendahara Pengeluaran 12.921.000 100% 12.921.000,00 14.265 905,78 barang (PHLN,COREMAP, 052) Cofunding dari BPP.3 Bandung 522 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027967 29-Dec-2021 Bendahara Pengeluaran 13.340.000 100% 13.340.000,00 14.265 935,16 barang (PHLN,COREMAP, 052) dari BPP.4 mataram 523 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028476 30-Dec-2021 Bendahara Pengeluaran 43.691.137 100% 43.691.137 14.269 3.061,96 barang (PHLN,COREMAP, 052) cofunding dari BP Pusat Jakarta 524 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028495 30-Dec-2021 Bendahara Pengeluaran 60.602.392 100% 60.602.392,00 14.269 4.247,14 barang (PHLN, COREMAP,052) dari BPP.1 Ambon 525 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701029683 3-Jan-2022 Bendahara Pengeluaran 94.984.000 100% 94.984.000 14.278 6.652,47 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta 526 Component 2 Penggantian UP untuk keperluan belanja barang 210881301019497 22-Oct-2021 Bendahara Pengeluaran 6.375.000,00 100% 6.375.000,00 14.165 450,050 (PHLN,COREMAP,052) dari BPP.4 Mataram, 527 Component 2 Penggantian UP untuk keperluan belanja Barang 210881301018075 7-Oct-2021 Bendahara Pengeluaran 48.122.000,00 100% 48.122.000,00 14.165 3.397,250 (PHLN,COREMAP,052) dari BPP.2 Cibinong 528 Component 4 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301001796 24 Februari 2021 Bendahara Pengeluaran 43.105.999,95 100% 43.105.999,95 14.089 3.059,55 Barang (COREMAP) Dari Bendahara Pengeluaran (Jakarta) 529 Component 4 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301001862 25 Februari 2021 Bendahara Pengeluaran 26.825.942,00 100% 26.825.942,00 14.300 1.875,94 Perjalanan Dinas ke Mataram -NTB, dalam rangka pendampingan kegiatan pemeriksaan cek fisik oleh BPK RI atas Pekerjaan Pembangunan Gedung Laboratorium BBIL Mataram LIPI, 530 Component 4 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301002967 12 Maret 2021 Bendahara Pengeluaran 39.901.094,10 100% 39.901.094,10 14.418 2.767,45 Barang (PHLN- COREMAP-053) Dari Bendahara Pengeluaran (Jakarta) 531 Component 4 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004795 9-Apr-2021 3.166.002,09 100% 3.166.002,09 14.631 216,39 Barang (PHLN,COREMAP,053) dari BPP.4 Mataram, Sesuai SPP Nomor 20026 Tanggal 9 April 2021 532 Component 4 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004746 8-Apr-2021 14.138.959,47 100% 14.138.959,47 14.631 966,37 Barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20024 Tanggal 8 April 2021 533 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002865 13-Apr-2021 9.422.071,38 100% 9.422.071,38 14.631 643,98 barang (PHLN,COREMAP,053) dari BPP.2 Cibinong, Sesuai SPP Nomor 20034 Tanggal 12 April 2021 534 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002862 13-Apr-2021 225.024,78 100% 225.024,78 14.631 15,38 Barang (PHLN,COREMAP,053) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20031 Tanggal 12 April 2021 535 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002961 15-Apr-2021 11.692.791,31 100% 11.692.791,31 14.633 799,07 barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20040 Tanggal 15 April 2021 536 Component 4 Pertanggungjawaban TUP Untuk Keperluan Belanja LIPI 210881701002957 14-Apr-2021 14.396.530,72 100% 14.396.530,72 14.633 983,84 Barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20037 Tanggal 14 April 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 537 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005437 17-May-2021 5.582.915,24 100% 5.582.915,24 14.203 393,08 barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20065 Tanggal 17 Mei 2021 538 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005432 17-May-2021 2.980.641,58 100% 2.980.641,58 14.203 209,86 barang (PHLN,COREMAP,053) dari BPP.5. P2O Jakarta, Sesuai SPP Nomor 20061 Tanggal 17 Mei 2021 539 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008430 21-Jun-2021 8.161.898,16 100% 8.161.898,16 14.453 564,72 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20094 Tanggal 18 Juni 2021 540 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008268 18-Jun-2021 103.432.749,97 100% 103.432.749,97 14.453 7.156,49 barang (PHLN,COREMAP 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20090 Tanggal 18 Juni 2021 541 Component 4 Penggantian UP untuk keperluan belanja barang LIPI 210881301011985 19/07/2021 Bendahara Pengeluaran 14.521.200,00 100% 14.521.200,00 14.524 999,81 (PHLN,COREMAP,053) dari BPP.1 Ambon, Sesuai SPP Nomor 20110 Tanggal 16 Juli 2021 542 Component 4 pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010931 28/07/2021 Bendahara Pengeluaran 34.791.402,00 100% 34.791.402,00 14.498 2.399,74 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20116 Tanggal 27 Juli 2021 543 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013253 31/08/2021 Bendahara Pengeluaran 35.380.300,00 100% 35.380.300,00 14.374 2.461,41 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, 544 Component 4 \Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301015594 07/09/2021 Bendahara Pengeluaran 77.190.000,00 100% 77.190.000,00 14.272 5.408,49 Perjalanan Dinas (PHLN, COREMAP,053) dalam rangka pelaksanaan FGD dan Indepth Interview Pelaku Kunci Coremap CTI di Gedung Kusnoto, Bogor Jawa Barat 545 Component 4 Penggantian UP untuk keperluan belaja barang LIPI 210881301016785 21-Sep-2021 Bendahara Pengeluaran 34.130.800,00 100% 34.130.800,00 14.165 2.409,52 (PHLN,COREMAP,053) dari BP Pusat jakarta 546 Component 4 Pembayaran Belanja barang berupa pembayaran LIPI 210881301016765 21-Sep-2021 Bendahara Pengeluaran 124.260.000,00 100% 124.260.000,00 14.165 8.772,33 perjalanan dinas (PHLN, COREMAP,053) dalam rangka monitoring safeguard RHM Coremap CTI di Mataram, NTB (Irfan Kampono) dan di Kab. Sikka, NTT (Deni Sutisna) tanggal 16 s.d. 21 September 2021 547 Component 4 Penggantian UP untu keperluan belanja barang LIPI 210881301017044 24-Sep-2021 Bendahara Pengeluaran 8.750.644,00 100% 8.750.644,00 14.165 617,77 (PHLN,COREMAP,053) dari B BPP.4 Mataram 548 Component 4 Pembayaran Belanja Barang (PHLN,COREMAP,053) LIPI 210881301019525 22-Oct-2021 Bendahara Pengeluaran 24.888.000,00 100% 24.888.000,00 14.165 1.757,01 berupa Perjalanan Dinas dalam rangka Pemeriksaan Fisik dan Serah Terima Pekerjaan Pengadaan Belanja Modal Peralatan dan Mesin Berupa Furniture Laboratorium BBIL Mataram di Lombok, NTB 549 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015362 29-Sep-2021 Bendahara Pengeluaran 47.805.600,00 100% 47.805.600,00 14.165 3.374,91 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 550 Component 4 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017378 29-Sep-2021 Bendahara Pengeluaran 158.560.000,00 100% 158.560.000,00 14.165 11.193,79 Perjalanan Dinas (PHLN, COREMAP,053) dalam rangka monitoring keamanan lingkungan dan social safeguard kegiatan reef Health Index and Related Ecosystem COREMAP CTI tanggal 3 s.d. 8 Oktober 2021 551 Component 4 Pembayaran Belanja Barang (PHLN,COREMAP,053) LIPI 210881303018585 08-Nov-21 1041065736 tanggal 13 PT. Kawan Lama Sejahtera 35.938.000 100% 35.938.000 14.268 2.518,78 berupa Pengadaan Waste Bin Role Stainless Matt 40L Oktober 2021 untuk Kantor Pusat Penelitian Oseanografi LIPI sesuai dengan Invoice nomor 1041065736 tanggal 13 Oktober 2021 552 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701020455 16-Nov-21 Bendahara Pengeluaran 73.950.854 100% 73.950.854 14.211 5.203,78 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 1 2 3 4 5 6 7 8 9 10 11 12 13 14 553 Component 4 Pembayaran belanja barang (PHLN,COREMAP,053) LIPI 210881301022039 18-Nov-21 Bendahara Pengeluaran 47.360.000,00 100% 47.360.000 14.231 3.327,95 berupa perjalanan dinas dalam rangka Koordinasi dan pengurusan dokumen pertanggungjawaban keuangan kegiatan Coremap CTI dan penyelesaian pembayaran dokumen dokumen kontrak LOB RHM Teluk Cenderawasih 554 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021967 29-Nov-21 Bendahara Pengeluaran 3.693.000,00 100% 3.693.000 14.340 257,53 barang (PHLN,COREMAP, 053) dari BPP.5 P2O Jakarta 555 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701022038 30-Nov-21 Bendahara Pengeluaran 440.000,00 100% 440.000 14.340 30,68 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 556 Component 4 Penggantian UP untuk keperluan belanja barang LIPI 210881301024304 7-Dec-2021 Bendahara Pengeluaran 31.830.029,00 100% 31.830.029,00 14.348 2.218,43 (PHLN,COREMAP,053) dari BP Pusat Jakarta 557 Component 4 Penggantian UP untuk keperluan belanja barang LIPI 210881301023400 1-Dec-2021 Bendahara Pengeluaran 79.688.200,00 100% 79.688.200,00 14.348 5.553,96 (PHLN,COREMAP, 053) dari BP Pusat Jakarta 558 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701022430 1-Dec-2021 Bendahara Pengeluaran 14.427.750,00 100% 14.427.750,00 14.348 1.005,56 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 559 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023692 14-Dec-2021 Bendahara Pengeluaran 29.523.940 100% 29.523.940,00 14.348 2.057,70 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 560 Component 4 Pembayaran belanja barang (PHLN,COREMAP,053) LIPI 210881302019983 16-Dec-2021 kwitansi Nomor 110/K/CV- CV. Pancuran Emas Jaya 48.068.500 100% 48.068.500,00 14.343 3.351,36 berupa pembayaran Pengadaan Perlengakapan Lapangan PEJ/XII/2021 Tanggal 16 untuk Tim Teknis Desember 2021 561 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027964 29-Dec-2021 Bendahara Pengeluaran 424.000 100% 424.000,00 14.265 29,72 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 562 Component 4 Penggantian Uang Persediaan untuk keperluan belanja LIPI 210881701028477 30-Dec-2021 Bendahara Pengeluaran 64.293.767 100% 64.293.767 14.269 4.505,84 barang (PHLN, COREMAP,053) dari BP Pusat Jakarta 563 Component 4 Pertanggungjawaban TUP untuk keperluan belanjan LIPI 210881701029684 3-Jan-2022 Bendahara Pengeluaran 3.838.000 100% 3.838.000 14.278 268,81 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta TOTAL EXPENDITURES 102.330.329.461,04 102.330.329.461,04 14.294 7.158.828,60 LAMPIRAN III Statement of Expenditures BY COMPONENT 1 for the Reporting Period of Jan 01 to Dec 31, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105000157 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Rizkie Satriya Utama 2 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000154 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Kristina Setiani 3 Component 1 Pemb. Tunjangan Biaya Hidup dll Program S3 Periode Feb Bappenas 211401105000155 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Fawzan Bhakti Soffa 4 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000161 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Samuel Radityo Adiprabowo 5 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000163 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Muhammad H Ghifari 6 Component 1 Pemb Bench Fees Fall 2020 - Spring 2021 dll Diklat S2 Bappenas 211401105000158 29 Januari 2021 350.434.000 100% 350.434.000 14.000 25.031,00 Luar Negeri Coremap-CTI utk Alan Ray Farandy dkk 5 Org an University of Rhode Island 7 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000162 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Fauzan Hidayat 8 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Per Feb-Mar 2021 Bappenas 211401105000164 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 Pend dan Pel Diklat LN COREMAP-CTI a.n Joyke Fredy Bastian Rumajar 9 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105000156 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n FNU Hariono 10 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S3 Bappenas 211401105000153 29 Januari 2021 45.654.000 100% 45.654.000 14.000 3.261,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Diky Suganda 11 Component 1 Pemb. Bench Fees Spring - Fall 2021 dll Diklat S2, S3 Luar Bappenas 211401105000204 09 Februari 2021 630.434.000 100% 630.434.000 14.000 45.031,00 Negeri COREMAP-CTI utk Fauzan Hidayat dkk 9 Org an University of Rhode Island 12 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105000205 09 Februari 2021 28.770.000 100% 28.770.000 14.000 2.055,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Alan Ray Farandy 13 Component 1 Pembayaran International Travel Program Diklat S2 Luar Bappenas 211401302000001 09 Februari 2021 41.338.080 100% 41.338.080 14.000 2.952,72 Negeri Coremap-CTI utk Lutfi Felanie, dkk 3 orang a.n PT. Jendela Dunia Wisata 14 Component 1 Pem Tunj Keberangkatan dan Transfer Fee Program S2 Bappenas 211401105000206 10 Februari 2021 46.203.750 100% 46.203.750 13.875 3.330,00 LN Per Tahun 2021 Pend dan Pel Diklat Gelar LN COREMAP-CTI a.n Alan Ray Farandy 15 Component 1 Pemb. International Travel Program S2 Diklat Gelar Luar Bappenas 211401302000005 11 Februari 2021 33.582.773 100% 33.582.773 13.875 2.420,38 Negeri Coremap-CTI utk Desak Made Pera Rosita Dewi an PT. Jendela Dunia Wisata 16 Component 1 Pembayaran International Travel Program S2 Diklat Gelar Bappenas 211401302000002 11 Februari 2021 33.582.773 100% 33.582.773 13.875 2.420,38 Luar Negeri Coremap-CTI untuk Alan Ray Farandy a.n PT. Jendela Dunia Wisata 17 Component 1 Pemb International travel Prog S2 LN Pend dan Pel Diklat Bappenas 211401302000006 11 Februari 2021 32.343.319 100% 32.343.319 13.875 2.331,05 Gelar LN CoremapCTI utk Ita Wulandari a.n PT. Jendela Dunia Wisata 1 2 3 4 5 6 7 8 9 10 11 12 13 14 18 Component 1 Pemb International travel Prog S2 LN Pend dan Pel Diklat Bappenas 211401302000004 11 Februari 2021 33.582.773 100% 33.582.773 13.875 2.420,38 Gelar LN CoremapCTI utk Meydar Hapsary Saleh a.n PT. Jendela Dunia Wisata 19 Component 1 Pem Tunj Keberangkatan dan Transfer Fee Program S2 Bappenas 211401105000291 26 Februari 2021 47.619.000 100% 47.619.000 14.300 3.330,00 LN Per Tahun 2021 Pend dan Pel Diklat Gelar LN COREMAP-CTI a.n Meydar H Saleh 20 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105000292 26 Februari 2021 29.386.500 100% 29.386.500 14.300 2.055,00 Negeri Periode Feb - Mar 2021 COREMAP-CTI a.n Desak Made Pera Rosita Dewi 21 Component 1 Pemb International travel Program S2 LN Pen dan Pel Bappenas 211401302000003 11 Februari 2021 33.632.723 100% 33.632.723 13.875 2.423,98 Diklat Gelar LN Coremap-CTI untuk Restya Rahmaniar a.n PT. Jendela Dunia Wisata 22 Component 1 Pemb Tunj Keberangkatan dan Transfer Fee Program S2 Bappenas 211401105000293 26 Februari 2021 47.619.000 100% 47.619.000 14.300 3.330,00 LN Periode Tahun 2021 Diklat Gelar LN COREMAP-CTI a.n Desak Made Pera Rosita Dewi 23 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105000294 26 Februari 2021 29.386.500 100% 29.386.500 14.300 2.055,00 Periode Feb - Mar 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Meydar H Saleh 24 Component 1 Pemb Tunj Keberangkatan dll Prog S2 LN Periode Th Bappenas 211401105000325 5 Maret 2021 49.407.498 100% 49.407.498 14.371 3.438,00 2021 Pend dan Pel Diklat Gelar LN COREMAP-CTI a.n Ita Wulandari 25 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Feb-Maret Bappenas 211401105000324 5 Maret 2021 17.044.006 100% 17.044.006 14.371 1.186,00 2021 Pend dan Pel Diklat Gelar LN COREMAP-CTI a.n ita Wulandari 26 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN Bappenas 211401105000339 9 Maret 2021 17.159.048 100% 17.159.048 14.468 1.186,00 Periode Feb-Maret 2021 Diklat Gelar LN COREMAP-CTI a.n Restya Rahmaniar 27 Component 1 Pemb Tunjangan Keberangkatan dan Transfer Fee Bappenas 211401105000342 15 Maret 2021 48.732.840 100% 48.732.840 14.418 3.380,00 Program S2 LN Periode Tahun 2021 Diklat Gelar LN COREMAP-CTI a.n Restya Rahmaniar 28 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar Bappenas 211401105000374 18 Maret 2021 235.131.780 100% 235.131.780 14.412 16.315,00 Negeri Coremap-CTI untuk Karyasiswa Restya Rahmaniar an University of Rhode Island 29 Component 3 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301001863 25 Februari 2021 Bendahara Pengeluaran 48.631.011 100% 48.631.011 14.300 3.400,77 Perjalanan Dinas dalam rangka Pemantauan Evaluasi TUK dan jejaring Data di Universitas Diponegoro Semarang tanggal 1 s.d. 4 Maret 2021, 30 Component 1 Pemb Tuition Fee Spring 2021 dll Program S2 Luar Negeri Bappenas 211401105000362 18 Maret 2021 210.011.664 100% 210.011.664 14.412 14.572,00 Coremap-CTI Karyasiswa Samuel Radityo Adiprabowo an University of Rhode Island 31 Component 1 Pemb. TF Spring 2021 dll Program S2 Luar Negeri Bappenas 211401105000377 18 Maret 2021 236.155.032 100% 236.155.032 14.412 16.386,00 Coremap-CTI Karyasiswa Desak Made Pera Rosita Dewi a.n University of Rhode Island 32 Component 1 Pemb TF Spring 2021 dll Prog S2 Diklat Gelar LN Coremap- Bappenas 211401105000373 18 Maret 2021 235.362.372 100% 235.362.372 14.412 16.331,00 CTI Utk Karyasiswa Alan Ray Farandi a.n Univ of Rhode Island 33 Component 1 Pemb. Tuition Fee Spring 2020 dll Program S2 Luar Bappenas 211401105000353 18 Maret 2021 211.885.224 100% 211.885.224 14.412 14.702,00 Negeri Coremap-CTI Karyasiswa Kristina Resmi Setiani a.n University of Rhode Island 34 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN Bappenas 211401105000376 18 Maret 2021 212.966.124 100% 212.966.124 14.412 14.777,00 Coremap-CTI utk Karyasiswa Muhammad Hafizh Ghifari. a.n University of Rhode Island 35 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar Bappenas 211401105000361 18 Maret 2021 210.011.664 100% 210.011.664 14.412 14.572,00 Negeri Coremap-CTI Karyasiswa Rizkie Satriya Utama a.n University of Rhode Island 1 2 3 4 5 6 7 8 9 10 11 12 13 14 36 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar Bappenas 211401105000379 18 Maret 2021 235.362.372 100% 235.362.372 14.412 16.331,00 Negeri Coremap-CTI Karyasiswa Meydar Hapsari Saleh a.n University of Rhode Island 37 Component 1 Pembayaran TF Spring 2021 dll Prog S2 LN Diklat Gelar Bappenas 211401105000354 18 Maret 2021 211.885.224 100% 211.885.224 14.412 14.702,00 LN Coremap-CTI utk Karyasiswa Fauzan Hidayat. a.n University of Rhode Island 38 Component 1 Pemb. Tuition Fee Spring 2021 dll Program S2 Luar Bappenas 211401105000363 18 Maret 2021 210.011.664 100% 210.011.664 14.412 14.572,00 Negeri Coremap-CTI Karyasiswa Fawzan Bhakti Soffa a.n University of Rhode Island 39 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN Bappenas 211401105000378 18 Maret 2021 236.947.692 100% 236.947.692 14.412 16.441,00 Coremap-CTI utk Karyasiswa Ita Wulandari a.n Univ of Rhode Island 40 Component 1 Pemb. Tuition Fee Spring 2021 dll S2 Luar Negeri Bappenas 211401105000352 18 Maret 2021 211.885.224 100% 211.885.224 14.412 14.702,00 Coremap-CTI Karyasiswa Joyke Fredy Bastian Rumajar a.n University of Rhode Island 41 Component 1 Pemb TF Spring 2021 dll Prog S2 LN Diklat Gelar LN Bappenas 211401105000375 18 Maret 2021 162.163.824 100% 162.163.824 14.412 11.252,00 Coremap-CTI utk Karyasiswa Hariono Hariono. a.n University of Rhode Island 42 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN Bappenas 211401105000484 06 April 2021 70.862.957 100% 70.862.957 14.533 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Fauzan Hidayat 43 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN April Bappenas 211401105000485 06 April 2021 70.862.957 100% 70.862.957 14.533 4.876,00 - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Joyke Fredy Bastian Rumajar 44 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN Bappenas 211401105000483 06 April 2021 70.862.957 100% 70.862.957 14.533 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n FNU Hariono 45 Component 1 Pembayaran Tunjangan Biaya Hidup dll Prog S2 LN Bappenas 211401105000509 08 April 2021 66.600.157 100% 66.600.157 14.513 4.589,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Kristina Setiani 46 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105000496 06 April 2021 70.765.388 100% 70.765.388 14.513 4.876,00 Negeri Periode Apr - Jun 2021 COREMAP-CTI a.n Samuel Radityo Adiprabowo 47 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Program S2 LN Bappenas 211401105000512 08 April 2021 70.765.388 100% 70.765.388 14.513 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Alan Ray Farandy 48 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Apr-Jun Bappenas 211401105000511 08 April 2021 70.765.388 100% 70.765.388 14.513 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Muhammad H Ghifari 49 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN Bappenas 211401105000497 06 April 2021 70.765.388 100% 70.765.388 14.513 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Fawzan Bhakti Soffa 50 Component 1 Pemb Tunj Biaya Hidup dan Transfer Fee Prog S2 LN Bappenas 211401105000513 08 April 2021 70.765.388 100% 70.765.388 14.513 4.876,00 Periode April - Juni 2021 Diklat Gelar LN COREMAP-CTI a.n Meydar H Saleh 51 Component 1 Pembayaran Tunjangan Biaya Hidup dll Periode Apr - Jun Bappenas 211401105000510 08 April 2021 70.765.388 100% 70.765.388 14.513 4.876,00 2021 Program S2 Luar Negeri COREMAP-CTI a.n Rizkie Satriya Utama 52 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LNPeriode Apr-Jun Bappenas 211401105000514 09 April 2021 71.350.508 100% 71.350.508 14.633 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Desak Made Pera Rosita Dewi 53 Component 1 Pembayaran Tunj Biaya Hidup Dll Program S2 LN Periode Bappenas 211401105000538 13 April 2021 71.350.508 100% 71.350.508 14.633 4.876,00 Apr-Jun 2021 Diklat Gelar LN COREMAP-CTI a.n Restya Rahmaniar 1 2 3 4 5 6 7 8 9 10 11 12 13 14 54 Component 1 Pembayaran Tunjangan Biaya Hidup dll Prog S2 LN Bappenas 211401105000539 13 April 2021 71.350.508 100% 71.350.508 14.633 4.876,00 Periode Apr-Jun 2021 Gelar LN COREMAP-CTI a.n Ita Wulandari 55 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 Bappenas 211401105000893 24 June 2021 70.477.704 100% 70.477.704 14.454 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Fauzan Hidayat 56 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 Bappenas 211401105000892 24 June 2021 70.477.704 100% 70.477.704 14.454 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Kristina Setiani 57 Component 1 Pemb. International Travel Program S3 Diklat Gelar Luar Bappenas 211401302000208 23 June 2021 17.359.832 100% 17.359.832 14.454 1.201,04 Negeri Coremap-CTI Karyasiswa Diky Suganda a.n PT.Jendela Dunia Wisata 58 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S3 Bappenas 211401105000900 25 June 2021 51.867.648 100% 51.867.648 14.472 3.584,00 Periode Apr - Jun 2021 Diklat Gelar Luar Negeri Coremap- CTI a.n Diky Suganda 59 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 Bappenas 211401105000894 25 June 2021 70.565.472 100% 70.565.472 14.472 4.876,00 LN Pend dan Pel COREMAP-CTI a.n Joyke Fredy Bastian Rumajar 60 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Juli-Sept Bappenas 211401105000902 28 June 2021 70.565.472 100% 70.565.472 14.472 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Samuel Radityo Adiprabowo 61 Component 1 Pemb Tunj Biaya Hidup periode Juli-Sep 2021 dll Prog S2 Bappenas 211401105000884 24 June 2021 70.565.472 100% 70.565.472 14.472 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n FNU Hariono 62 Component 1 Pemb Tunj Biaya Hidup periode Jul-Sept 2021 dll Prog S2 Bappenas 211401105000885 24 June 2021 70.565.472 100% 70.565.472 14.472 4.876,00 LN Pendidikan dan Pelatihan COREMAP-CTI a.n Rizkie Satriya Utama 63 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Periode Juli-Sept Bappenas 211401105000903 28 June 2021 70.565.472 100% 70.565.472 14.472 4.876,00 2021 Diklat Gelar LN COREMAP-CTI a.n Fawzan Bhakti Soffa 64 Component 1 100% Pemb Tunj Biaya Hidup dll Program S2 LN Periode Juli- Bappenas 211401105000908 30/06/2021 70.614.232 70.614.232 14.482 4.876,00 Sept 2021 Diklat LN COREMAP-CTI a.n Restya Rahmaniar 65 Component 1 Pemb Tunj Biaya Hidup dll Prog S2 LN Juli-Sept 2021 100% Pendidikan dan Pelatihan LN COREMAP-CTI a.n Desak Bappenas 211401105000920 01/07/2021 70.614.232 70.614.232 14.482 4.876,00 Made Pera Rosita Dewi 66 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 100% Periode Jul - Sep 2021 Diklat Gelar Luar Negeri Coremap- Bappenas 211401105000934 02/07/2021 70.614.232 70.614.232 14.482 4.876,00 CTI an Alan Ray Farandy 67 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 100% Periode Jul - Sep 2021 Diklat Gelar Luar Negeri Coremap- Bappenas 211401105000909 30/06/2021 70.614.232 70.614.232 14.482 4.876,00 CTI an Meydar H Saleh 68 Component 1 Pemb International travel Prog S2 LN Pendidikan dan 100% Pelatihan Coremap-CTI PT Jendela Dunia Wisata a.n Bappenas 211401105000907 30/06/2021 70.614.232 70.614.232 14.482 4.876,00 Muhammad H Ghifari 69 Component 1 Pemb International travel Prog S2 LN Pendidikan dan 100% 1.631,97 Pelatihan Coremap-CTI PT Jendela Dunia Wisata a.n Bappenas 211401302000284 04/08/2021 23.405.714 23.405.714 14.342 Muhammad H Ghifari 70 Component 1 Pemb Tunjangan Biaya Hidup Program S2 LN Periode Juli 100% 210,71 2021 Diklat Gelar LN COREMAP-CTI a.n Muhammad Bappenas 211401304000198 09/09/2021 3.007.234 3.007.234 14.272 Hafizh Ghifari 71 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001389 13-Okt-21 Boma Kresning 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course Coremap-CTI an Sdr Boma Kresning 1 2 3 4 5 6 7 8 9 10 11 12 13 14 72 Component 1 Pemb. Tunjangan Biaya Hidup dll Program Diklat S2 Luar Bappenas 211401105001321 01-Okt-21 Samuel Radityo Adiprabowo 69.068.540 100% 69.068.540 14.165 4.876,00 Negeri Periode Okt - Des 2021 COREMAP-CTI a.n Samuel Radityo Adiprabowo 73 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001351 06-Okt-21 Restya Rahmaniar 69.068.540 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Restya Rahmaniar 74 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001404 14-Okt-21 Hary Christijanto 65.031.515 100% 65.031.515 14.165 4.591,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n Hary Christijanto 75 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001348 06-Okt-21 Fauzan Hidayat 69.068.540 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Fauzan Hidayat 76 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105001331 04-Okt-21 Meydar H Saleh 69.068.540 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri Coremap- CTI an Meydar H Saleh 77 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001352 06-Okt-21 Ita Wulandari 73.488.020 100% 73.488.020 14.165 5.188,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Ita Wulandari 78 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001406 14-Okt-21 Selvia Oktaviyani 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course Coremap-CTI a.n Ibu Selvia Oktaviyani 79 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001391 13-Okt-21 Ali Muharam 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course Coremap-CTI an Sdr Ali Muharam 80 Component 1 Pemb. Biaya Hidup dll The Science for Sustainable Bappenas 211401105001393 13-Okt-21 Februanty Suyatiningsih Purnomo 58.388.130 100% 58.388.130 14.165 4.122,00 Fisheries Policy Professional Short Course Coremap-CTI a.n Februanty Suyatiningsih Purnomo 81 Component 1 Pemb. Tunjangan Biaya Hidup dll Program S2 Periode Okt Bappenas 211401105001318 01-Okt-21 Fawzan Bhakti Soffa 69.068.540 100% 69.068.540 14.165 4.876,00 - Des 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n Fawzan Bhakti Soffa 82 Component 1 Pemb Tunj Biaya Hidup dll periode Okt-Des 2021 Prog S2 Bappenas 211401105001350 06-Okt-21 Joyke Fredy Bastian Rumajar 69.068.540 100% 69.068.540 14.165 4.876,00 Diklat Gelar LN COREMAP-CTI a.n Joyke Fredy Bastian Rumajar 83 Component 1 Pembayaran Biaya Hidup dll Prog Pelatihan University of Bappenas 211401105001403 14-Okt-21 Lelly Hasni Pertamawati 58.388.130 100% 58.388.130 14.165 4.122,00 Rhode Island Tahap I LN COREMAP-CTI a.n Ibu Lelly Hasni Pertamawati 84 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001402 14-Okt-21 Setyawati 58.388.130 100% 58.388.130 14.165 4.122,00 Sustainable Fisheries Policy Professional Short Course Coremap-CTI an Setyawati 85 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001394 13-Okt-21 Mochamad Idnillah 58.388.130 100% 58.388.130 14.165 4.122,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n Bpk Mochamad Idnillah 86 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105001319 01-Okt-21 Hariono 69.068.540 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri COREMAP-CTI a.n FNU Hariono 87 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001405 14-Okt-21 Angga Nugraha 58.388.130 100% 58.388.130 14.165 4.122,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n Angga Nugraha 88 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001396 13-Okt-21 Augy Syahailatua 65.031.515 100% 65.031.515 14.165 4.591,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n Augy Syahailatua 89 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001320 01-Okt-21 Kristina Setiani 69.068.540 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Kristina Setiani 1 2 3 4 5 6 7 8 9 10 11 12 13 14 90 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Bappenas 211401105001330 04-Okt-21 Alan Ray Farandy 69.068.540 100% 69.068.540 14.165 4.876,00 Periode Okt - Des 2021 Diklat Gelar Luar Negeri Coremap- CTI an Alan Ray Farandy 91 Component 1 Pemb Biaya Hidup dll Program Pelatihan University of Bappenas 211401105001392 13-Okt-21 Mochammad Rachadian Prayoga 58.388.130 100% 58.388.130 14.165 4.122,00 Rhode Island Tahap I LN COREMAP-CTI a.n Mochammad Rachadian Prayoga 92 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001390 13-Okt-21 Mohamad Agung Widodo 58.388.130 100% 58.388.130 14.165 4.122,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n Mohamad Agung Widodo 93 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001395 13-Okt-21 Yesi Dewita Sari 58.388.130 100% 58.388.130 14.165 4.122,00 University of Rhode Island Tahap I LN COREMAP-CTI a.n Yesi Dewita Sari 94 Component 1 Pembayaran Tunj Biaya Hidup dll periode Okt-Des 2021 Bappenas 211401105001349 06-Okt-21 Rizkie Satriya Utama 69.068.540 100% 69.068.540 14.165 4.876,00 Prog S2 Diklat Gelar LN COREMAP-CTI a.n Rizkie Satriya Utama 95 Component 1 Pemb Tunjangan Biaya Hidup dll Program S2 Periode Okt - Bappenas 211401105001323 04-Okt-21 Desak Made Pera Rosita Dewi 69.068.540 100% 69.068.540 14.165 4.876,00 Des 2021 Diklat Luar Negeri Coremap-CTI an Desak Made Pera Rosita Dewi 96 Component 1 Pembayaran Sekaligus Paket Kegiatan Pelatihan Nasional Bappenas 211401304000276 02-Nov-21 PT GRAHAWITA CENDEKIA 146.221.000 100% 146.221.000 14.261 10.253,21 Perencanaan Ruang Laut Tingkat Dasar Program Coremap-CTI Tahun 2021 97 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000292 03-Nov-21 Supriyadi Saleh 2.605.000 100% 2.605.000 14.261 182,67 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n Supriyadi Saleh 98 Component 1 Pemb. Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000461 02-Nov-21 Decky Thao 4.015.027 100% 4.015.027 14.261 281,54 Perencanaan Ruang Laut Tingkat Dasar Tahun 2021 Diklat Coremap-CTI an Decky Thao 99 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000291 03-Nov-21 Risnadi 2.535.000 100% 2.535.000 14.261 177,76 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n Risnadi 100 Component 1 Penggantian Uang Persediaan Ke- 18 Pada PPK 06.10 Bappenas 211401303000452 01-Nov-21 Bendahara Pengeluaran 21.350.000 100% 21.350.000 14.261 1.497,09 untuk Keperluan Belanja Belanja Barang Non Operasional Lainnya 101 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000290 03-Nov-21 Ahmad Rayhan Kamil 2.560.000 100% 2.560.000 14.261 179,51 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n Ahmad Rayhan Kamil 102 Component 1 Pemb Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000301 04-Nov-21 Teni Nawalusi Ir 2.605.000 100% 2.605.000 14.301 182,16 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Diklat Coremap-CTI an Teni Nawalusi Ir 103 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000299 04-Nov-21 Untung Ismoyo 2.605.000 100% 2.605.000 14.301 182,16 Tahun 2021 Diklat COREMAP-CTI Pusbindiklatren a.n Untung Ismoyo 104 Component 1 Pemb Biaya Hidup dll Program Pelatihan Nasional Bappenas 211401304000300 04-Nov-21 Annis Sholiha 2.605.000 100% 2.605.000 14.301 182,16 Perencanaan Ruang Laut Tingkat Dasar Tahun 2021 Diklat Coremap-CTI an Annis Sholihat 105 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000500 05-Nov-21 Waty Darmawaty 2.605.000 100% 2.605.000 14.327 181,82 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Waty Darmawaty 106 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000499 05-Nov-21 Indah Damayanti 2.605.000 100% 2.605.000 14.327 181,82 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Sdri Indah Damayanti 107 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401302000522 08-Nov-21 Suci Alisafira 2.605.000 100% 2.605.000 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI an Suci Alisafira 1 2 3 4 5 6 7 8 9 10 11 12 13 14 108 Component 1 Penggantian Uang Persediaan Ke-19 Pada Bappenas 211401303000503 08-Nov-21 Bendahara Pengeluaran 59.552.299 100% 59.552.299 14.268 4.173,84 PPK 06.10 untuk Keperluan Belanja Barang Non Operasio nal Lainnya 109 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401302000523 08-Nov-21 Dhian Widiyani 2.605.000 100% 2.605.000 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI an Dhian Widiyani 110 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000501 05-Nov-21 Anindya Arma Risanti 2.605.000 100% 2.605.000 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Anindya Arma Risanti 111 Component 1 Pembayaran Fasilitator Pelatihan dll Pelatihan Nasional Bappenas 211401304000321 09-Nov-21 Dinah Yunitawati 2.555.000 100% 2.555.000 14.268 179,07 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Dinah Yunitawati 112 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401303000502 05-Nov-21 Irfan Thofiq Firdaus 2.605.000 100% 2.605.000 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Irfan Thofiq Firdaus 113 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401302000536 08-Nov-21 Eka Yudhistira S.Pi,MM 2.605.000 100% 2.605.000 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI an Eka Yudhistira S.Pi,MM 114 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401302000521 08-Nov-21 Elmy Yasinta Ciptadi 2.605.000 100% 2.605.000 14.268 182,58 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI an Elmy Yasinta Ciptadi 115 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Pelatnas Bappenas 211401302000524 08-Nov-21 R Arief Budikusuma 2.605.000 100% 2.605.000 14.268 182,58 Tahun 2021 Diklat COREMAP-CTI utk Karyasiswa a.n R Arief Budikusuma 116 Component 1 Pembayaran International travel Program Coremap-CTI Bappenas 211401302000548 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473 100% 23.537.473 14.243 1.652,56 Karyasiswa Lelly Hasni Pertamawati a.n PT. Jendela Dunia Wisata 117 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional Bappenas 211401304000328 11-Nov-21 Arief Sudianto 2.555.000 100% 2.555.000 14.243 179,39 Tahun 2021 Diklat COREMAP-CTI a.n Arief Sudianto 118 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional Bappenas 211401301000194 11-Nov-21 Arief Widianto 3.155.000 100% 3.155.000 14.243 221,51 Tahun 2021 Diklat COREMAP-CTI a.n Arief Widianto 119 Component 1 Pembayaran International travel Program Coremap-CTI Bappenas 211401302000547 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473 100% 23.537.473 14.243 1.652,56 Karyasiswa Februanty Suyatiningsih a.n PT. Jendela Dunia Wisata 120 Component 1 Pembayaran International travel Program Coremap-CTI Bappenas 211401302000546 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473 100% 23.537.473 14.243 1.652,56 Karyasiswa Selvia Octaviani a.n PT. Jendela Dunia Wisata 121 Component 1 Pembayaran International travel Program Coremap-CTI Bappenas 211401302000549 12-Nov-21 PT. Jendela Dunia Wisata 23.537.473 100% 23.537.473 14.243 1.652,56 Karyasiswa Moh Agung Widodo a.n PT. Jendela Dunia Wisata 122 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Pelatnas Bappenas 211401304000327 11-Nov-21 Ifan Setiawan 2.605.000 100% 2.605.000 14.243 182,90 Tahun 2021 Diklat COREMAP-CTI utk Karyasiswa a.n Ifan Setiawan 123 Component 1 Pembayaran Pelatihan dll Program Pelatihan Nasional Bappenas 211401303000512 11-Nov-21 Lia Kusumawati 2.555.000 100% 2.555.000 14.243 179,39 Tahun 2021 Diklat COREMAP-CTI a.n Ibu Lia Kusumawati 124 Component 1 Pemb Tunjangan Pelatihan dll Pelatihan Nasional Bappenas 211401302000557 17-Nov-21 Risty Utami dkk (8 Orang) 25.118.746 100% 25.118.746 14.211 1.767,56 Perencanaan Ruang Laut Tingkat Menengah I Th 2021 Coremap-CTI an Risty Utami dkk (8 Orang) 125 Component 1 Pembayaran International Travel Program Diklat Luar Bappenas 211401302000556 17-Nov-21 PT. Jendela Dunia Wisata 23.537.473 100% 23.537.473 14.211 1.656,29 Negeri Coremap-CTI Karyasiswa Setyawati a.n PT. Jendela Dunia Wisata 126 Component 1 Pembayaran Tunjangan Biaya Hidup Prog Pelatnas Tahun Bappenas 211401302000551 15-Nov-21 Stevanus Bayu Mangkurat 2.110.000 100% 2.110.000 14.211 148,48 2021 Diklat COREMAP-CTI utk Karyasiswa a.n R. Stevanus Bayu Mangkurat 1 2 3 4 5 6 7 8 9 10 11 12 13 14 127 Component 1 Pemb Tunj Pelatihan dll Pelatihan Nasional Perencanaan Bappenas 211401303000515 17-Nov-21 Kholqi Azam Rizaldi dkk 4 Orang 16.128.545 100% 16.128.545 14.211 1.134,93 Ruang Laut Tingkat Dasar Th 2021 Coremap-CTI an Sdr Kholqi Azam Rizaldi dkk 4 Orang 128 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Bappenas 211401303000514 15-Nov-21 Kemal Pramayuda 2.605.000 100% 2.605.000 14.211 183,31 Pelatihan Nasional Tahun 2021 Diklat COREMAP-CTI a.n Sdr Kemal Pramayuda 129 Component 1 Pemb Tunj Pelatihan dll Pelatihan Nasional Perencanaan Bappenas 211401301000200 17-Nov-21 Muhammad Danny Sianggaputra 2.110.000 100% 2.110.000 14.211 148,48 Ruang Laut Tingkat Dasar Th 2021 Coremap-CTI an Muhammad Danny Sianggaputra 130 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Tahun Bappenas 211401304000335 15-Nov-21 Lalu Deden Yuda Pratama 2.605.000 100% 2.605.000 14.211 183,31 2021 Diklat COREMAP-CTI a.n Lalu Deden Yuda Pratama 131 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401304000336 15-Nov-21 Donny Orlando W 2.605.000 100% 2.605.000 14.211 183,31 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Donny Orlando W 132 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Pelatnas Bappenas 211401304000332 15-Nov-21 Yusuf Arief Afandy 2.605.000 100% 2.605.000 14.211 183,31 Tahun 2021 Diklat COREMAP-CTI utk Karyasiswa a.n Yusuf Arief Afandy 133 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Tahun Bappenas 211401304000333 15-Nov-21 Irvan Muhammad, dkk (2 Orang) 5.210.000 100% 5.210.000 14.211 366,62 2021 Diklat COREMAP-CTI a.n Irvan Muhammad, dkk (2 Orang) 134 Component 1 Pemb Tunjangan Biaya Hidup dll Pelatihan Nasional Bappenas 211401304000334 15-Nov-21 Suryadi Fadillah 2.605.000 100% 2.605.000 14.211 183,31 Perencanaan Ruang Laut Tingkat Dasar Th 2021 Coremap- CTI a.n Suryadi Fadillah 135 Component 1 Penggantian Uang Persediaan Ke-20 Pada PPK 06.10 Bappenas 211401303000516 18-Nov-21 Bendahara Pengeluaran 78.343.442 100% 78.343.442 14.231 5.505,13 untuk Keperluan Belanja Barang Non Operasional Lainnya 136 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional PRL Tingkat Bappenas 211401303000523 19-Nov-21 Bpk M Mukhlis Kamal, Dkk (3 7.351.970 100% 7.351.970 14.231 516,62 Menengah II Th 2021 Coremap-CTI a.n Bpk M Mukhlis Orang) Kamal, Dkk (3 Orang) 137 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional Perencanaan Bappenas 211401304000342 19-Nov-21 Hatim Albasri SPI dkk 2 Orang 6.095.730 100% 6.095.730 14.231 428,34 Ruang Laut Tingkat Menengah II Th 2021 Coremap-CTI an Hatim Albasri SPI dkk 2 Orang 138 Component 1 Pembayaran Biaya Hidup dll Pelatihan Nasional PRL Bappenas 211401304000341 19-Nov-21 Yudi Wahyudin, S.PI, M.SI 10.860.000 100% 10.860.000 14.231 763,12 Tingkat Menengah Angkatan II Tahun 2021 Coremap-CTI a.n Yudi Wahyudin, S.PI, M.SI 139 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000340 19-Nov-21 Hendra Kusuma Wardana, dkk 2 5.155.000 100% 5.155.000 14.231 362,24 Nasional COREMAP-CTI a.n Hendra Kusuma Wardana, Org dkk 2 Org 140 Component 1 Pemb Biaya Hidup dll Pelatihan Nasional PRL Tingkat Bappenas 211401302000566 22-Nov-21 Prof. Dr. Ir. Akhmad Fauzi M.Sc, 36.454.520 100% 36.454.520 14.255 2.557,31 Menengah II Th 2021 Coremap-CTI a.n Prof. Dr. Ir. dkk (4 Orang) Akhmad Fauzi M.Sc, dkk (4 Orang) 141 Component 1 Pembayaran International Travel Program Diklat Luar Bappenas 211401302000571 23-Nov-21 PT. Jendela Dunia Wisata 23.531.636 100% 23.531.636 14.255 1.650,76 Negeri Coremap-CTI Karyasiswa Mochamad Idnillah a.n PT. Jendela Dunia Wisata 142 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Bappenas 211401301000203 22-Nov-21 Danang Pramudita 2.855.000 100% 2.855.000 14.255 200,28 Pelatihan Nasional Menengah Angkatan II COREMAP-CTI a.n Danang Pramudita 143 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401301000202 22-Nov-21 Hadi Prayitno, dkk 2 Org 6.652.520 100% 6.652.520 14.255 466,68 Nasional COREMAP-CTI a.n Hadi Prayitno, dkk 2 Org 144 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000345 23-Nov-21 Tendy Kuhaja S.PI 2.412.000 100% 2.412.000 14.255 169,20 Nasional Menengah I COREMAP-CTI a.n Tendy Kuhaja S.PI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 145 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000346 23-Nov-21 Giri Wilisandy 2.329.000 100% 2.329.000 14.255 163,38 Nasional PRL Tingkat Menengah I Tahun 2021 Diklat Coremap-CTI an Giri Wilisandy 146 Component 1 Pembayaran Tuition Fee Fall 2021-Spring 2022 dll Prog Bappenas 211401105001536 15-Nov-21 University of Rhode Island 2.329.994.005 100% 2.329.994.005 14.255 163.451,00 S2 LN utk Karyasiswa Desak Made Pera Rosita Dewi, dkk 5 Orang a.n URI 147 Component 1 Pemb TF Fall 2021 dll Prog S2 LN Diklat Coremap-CTI Bappenas 211401105001539 15-Nov-21 University of Rhode Island 1.771.953.520 100% 1.771.953.520 14.255 124.304,00 Karyasiswa Joyke Fredy Bastian Rumajar dkk(7 Orang) a.n University of Rhode Island 148 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401303000525 26-Nov-21 Endiena Bulan Mutiara Sani, dkk 4 9.305.104 100% 9.305.104 14.340 648,89 Nasional COREMAP-CTI a.n Endiena Bulan Mutiara Sani, Orang dkk 4 Orang 149 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401302000584 26-Nov-21 Tommy Hermawan, dkk (2 Orang) 5.075.000 100% 5.075.000 14.340 353,91 Nasional COREMAP-CTI a.n Tommy Hermawan, dkk (2 Orang) 150 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000350 25-Nov-21 Suryadi Fadillah 2.469.057 100% 2.469.057 14.340 172,18 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Suryadi Fadillah 151 Component 1 Pembayaran Tunjangan Biaya Hidup dll Pelatihan Bappenas 211401304000349 25-Nov-21 Arief Sudianto 1.998.000 100% 1.998.000 14.340 139,33 Nasional PRL Tingkat Menengah Angkatan II Tahun 2021 Coremap-CTI a.n Arief Sudianto 152 Component 1 Pemb Tunj Pelatihan dll Prog Pelatihan Nasional PRL Bappenas 211401304000356 26-Nov-21 Yuli Deviani Riadi, Dkk(2 Orang) 4.603.794 100% 4.603.794 14.340 321,05 Tingkat Menengah II Tahun 2021 Coremap-CTI a.n Yuli Deviani Riadi, Dkk(2 Orang) 153 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000357 26-Nov-21 I Gede Wina Parmana Putra 4.622.337 100% 4.622.337 14.340 322,34 Nasional PRL Tingkat Menengah I Tahun 2021 Coremap- CTI a.n I Gede Wina Parmana Putra 154 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000351 25-Nov-21 Deenisa Rochadjia, dkk 6 Orang 23.535.476 100% 23.535.476 14.340 1.641,25 Nasional Diklat COREMAP-CTI a.n Deenisa Rochadjia, dkk 6 Orang 155 Component 1 Pemb Travel Insurance Program Diklat Luar Negeri Bappenas 211401302000577 25-Nov-21 PT Zurich Asuransi Indonesia 9.833.000 100% 9.833.000 14.340 685,70 Coremap-CTI Karyasiswa Mochamad Idnillah dkk (13 orang) a.n PT Zurich Asuransi Indonesia 156 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401301000204 25-Nov-21 Arief Widianto 2.243.000 100% 2.243.000 14.340 156,42 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Arief Widianto 157 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000358 26-Nov-21 Supradianto Nugroho 2.505.000 100% 2.505.000 14.340 174,69 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Supradianto Nugroho 158 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000348 25-Nov-21 Yusuf Arief Afandy 2.734.090 100% 2.734.090 14.340 190,66 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Yusuf Arief Afandy 159 Component 1 Pembayaran Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000360 26-Nov-21 Budi Mulyono 2.205.000 100% 2.205.000 14.340 153,77 Nasional Perencanaan Diklat COREMAP-CTI a.n Budi Mulyono 160 Component 1 Pemb Tunjangan Pelatihan dll Program Pelatihan Bappenas 211401304000359 26-Nov-21 Alex Fransisca 2.155.000 100% 2.155.000 14.340 150,28 Nasional PRL Tingkat Menengah II Tahun 2021 Coremap- CTI a.n Alex Fransisca 161 Component 1 Pemb Bench Fee 2021-2022 dll Program S2 Luar Negeri Bappenas 211401105001613 26-Nov-21 University of Rhode Island 287.244.540 100% 287.244.540 14.340 20.031,00 Coremap-CTI utk Desak Made Pera Rosita Dewi dkk 5 Orang an University of Rhode Island 162 Component 1 Penggantian Uang Persediaan Ke-21 Pada PPK 06.10 Bappenas 211401303000557 02-Dec-21 BPG 019 KEMENTERIAN PPN/BAP 1.648.400 100% 1.648.400 14.348 114,89 untuk Keperluan Belanja Barang Non Operasional PENAS Lainnya 1 2 3 4 5 6 7 8 9 10 11 12 13 14 163 Component 1 Pembayaran Tunjangan Pelatihan dll Pelatihan Nasional Bappenas 211401304000386 03-Dec-21 Muhammad Aththaar Nazim 4.485.088 100% 4.485.088 14.348 312,59 PRL Tingkat Menengah II Tahun 2021 Diklat Coremap-CTI a.n Muhammad Aththaar Nazim 164 Component 1 Pemb Tunj Pelatihan dll Prog Pelatihan Nasional PRL Bappenas 211401302000607 01-Dec-21 Nurfitri Syadiah 23.166.568 100% 23.166.568 14.348 1.614,62 Tingkat Menengah II Tahun 2021 Coremap-CTI a.n Nurfitri Syadiah 165 Component 1 Pembayaran Biaya Hidup dll Program Pendidikan dan Bappenas 211401105001669 08-Dec-21 Selvia Oktaviyani 17.074.120 100% 17.074.120 14.348 1.190,00 Pelatihan Luar Negeri COREMAP-CTI a.n Ibu Selvia Oktaviyani 166 Component 1 Pemb Pelatihan The Science for Sustainable Fisheries Bappenas 211401105001629 02-Dec-21 University of Rhode Island 720.169.164 100% 720.169.164 14.348 50.193,00 Policy Professional Short Course dll Coremap-CTI utk Augy Syahailatua dkk 13 Org an 167 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001647 03-Dec-21 Setyawati 13.487.120 100% 13.487.120 14.348 940,00 COREMAP-CTI a.n Setyawati 168 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001651 06-Dec-21 Lelly Hasni Pertamawati 13.487.120 100% 13.487.120 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II an Ibu Lelly Hasni Pertamawati 169 Component 1 Pembayaran Biaya Hidup dll Program Pelatihan Bappenas 211401105001646 03-Dec-21 Mochamad Idnillah 13.487.120 100% 13.487.120 14.348 940,00 COREMAP-CTI a.n Bpk Mochamad Idnillah 170 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001665 06-Dec-21 Februanty Suyatiningsih Purnomo 13.487.120 100% 13.487.120 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II an Februanty Suyatiningsih Purnomo 171 Component 1 Pembayaran International Travel Program Diklat Luar Bappenas 211401302000658 09-Dec-21 PT. Jendela Dunia Wisata 23.537.473 100% 23.537.473 14.378 1.637,05 Negeri Coremap-CTI Karyasiswa Hary Christijanto a.n PT. Jendela Dunia Wisata 172 Component 1 Pemb International travel Prog Coremap-CTI utk Bappenas 211401302000675 13-Dec-21 PT. Jendela Dunia Wisata 47.570.332 100% 47.570.332 14.378 3.308,55 Karyasiswa Augy Syahailatua, dkk 2 orang a.n PT. Jendela Dunia Wisata 173 Component 1 Pemb International travel Prog Coremap-CTI utk Bappenas 211401302000676 13-Dec-21 PT. Jendela Dunia Wisata 47.570.270 100% 47.570.270 14.378 3.308,55 Karyasiswa Mochammad Rachadian Prayoga, dkk 2 org a.n PT. Jendela Dunia Wisata 174 Component 1 Pembayaran International Travel Program Pelatihan Bappenas 211401302000692 14-Dec-21 PT. Jendela Dunia Wisata 47.570.270 100% 47.570.270 14.348 3.315,46 Diklat Luar Negeri Coremap-CTI utk Karyasiswa Boma Kresning, dkk (2 orang) 175 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001678 10-Dec-21 Mohamad Agung Widodo 13.487.120 100% 13.487.120 14.348 940,00 Sustainable Fisheries Policy Professional Short Course II an Sdr Mohamad Agung Widodo 176 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program Luar Bappenas 211401105001687 13-Dec-21 Ita Wulandari 69.960.848 100% 69.960.848 14.348 4.876,00 Negeri COREMAP-CTI a.n Ita Wulandari 177 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105001703 14-Dec-21 Desak Made Pera Rosita Dewi 69.960.848 100% 69.960.848 14.348 4.876,00 Negeri Periode Jan - Mar 2022 Coremap-CTI a.n Desak Made Pera Rosita Dewi 178 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105001686 13-Dec-21 Restya Rahmaniar 69.960.848 100% 69.960.848 14.348 4.876,00 Negeri COREMAP-CTI a.n Restya Rahmaniar 179 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 LN Bappenas 211401105001685 13-Dec-21 Meydar H Saleh 69.960.848 100% 69.960.848 14.348 4.876,00 COREMAP-CTI a.n Meydar H Saleh 180 Component 1 Pembayaran Tunjangan Biaya Hidup dll Program S2 Luar Bappenas 211401105001702 14-Dec-21 Alan Ray Farandy 69.960.848 100% 69.960.848 14.348 4.876,00 Negeri Periode Jan - Mar 2022 Coremap-CTI a.n Alan Ray Farandy 181 Component 1 Pemb Biaya Hidup dll Pelatihan The Science for Bappenas 211401105001679 10-Dec-21 Hary Christijanto 14.979.312 100% 14.979.312 14.348 1.044,00 Sustainable Fisheries Policy Professional Short Course II a.n Hary Christijanto 182 Component 1 Pertanggungjawaban Tambahan Uang Persediaan Ke 6 P Bappenas 211401701000182 21-Dec-21 BPG 019 KEMENTERIAN PPN/BAP 962.751.012 100% 962.751.012 14.349 67.095,34 ada PPK 06.10 untuk Keperluan Belanja Barang Non Oper PENAS asional Lainnya 1 2 3 4 5 6 7 8 9 10 11 12 13 14 183 Component 1 Pertanggungjawaban Tambahan Uang Persediaan Ke 6 P Bappenas 211401701000207 29-Dec-2021 Bendahara Pengeluaran 937.268.219 100% 937.268.219 14.265 65.704,05 ada PPK 06.10 untuk Keperluan Belanja Barang Non Oper asional Lainnya 184 Component 1 Pembayaran Belanja Modal Berupa Pembayaran Jasa LIPI 210881302001089 8 Februari 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 3.732.586.620 100% 3.732.586.620 14.000 266.613,33 Konstruksi Pembangunan Gedung Pusat Data Nasional November 2019 Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, Bertingkat 8 185 Component 1 Pembayaran Termin I Paket Pekerjaan Manajemen LIPI 210881302001170 10 Februari 2021 1416/IPK.2.03/LK/V/2019, 10 PT. WAHANA CIPTA 90.071.254 100% 90.071.254 13.989 6.438,72 Konstruksi Pembangunan Gedung Pusat Data Nasional Mei 2019 BANGUNWISMA Ekosistem Pesisir, Laboratorium dan Ruang Kerja, sesuai dengan SPK Nomor: 1416/IPK.2.03/LK/V/2019 tanggal 10 Mei 186 Component 1 Pembayaran Termin II Pekerjaan Pembangunan Gedung LIPI 210881302001349 15 Februari 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 3.820.291.856 100% 3.820.291.856 13.875 275.336,35 Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan November 2019 Ruang Kerja Pusat Penelitian Oseanografi 187 Component 1 Pembayaran Belanja Modal (PHLN-COREMAP) berupa LIPI 210881302001987 2 Maret 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 1.767.299.305 100% 1.767.299.305 14.371 122.976,78 Pembayaran Termin III Pekerjaan Pembangunan Gedung November 2019 Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI 188 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301002882 10 Maret 2021 Bendahara Pengeluaran 169.456.052 100% 169.456.052 14.418 11.753,09 Perjalanan Dinas (PHLN- COREMAP) dalam rangka kegiatan Reef Health Monitoring di Kabupaten Tapanuli Tengah tanggal 13-23 Maret 2021 189 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301003100 15 Maret 2021 Bendahara Pengeluaran 131.043.039 100% 131.043.039 14.418 9.088,85 perjalanan dinas (PHLN- COREMAP-051) dalam rangka kegiatan verifikasi Tempat Uji Kompetensi (TUK) ke Universitas Bangka Belitung tanggal 16 s.d. 19 Maret 2021 190 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301003099 15 Maret 2021 Bendahara Pengeluaran 162.900.043 100% 162.900.043 14.418 11.298,38 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan pengambilan data monitoring kesehatan terumbu karang dan ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) 191 Component 1 Pembayaran Belanja Modal (PHLN-COREMAP) berupa LIPI 210881303002272 12 Maret 2021 4414/IPK.2.03/LK/XII/2019, PT Anugrah Bangun Kencana 3.325.114.052 100% 3.325.114.052 14.418 230.622,42 Pembayaran Pekerjaan Penyelesaian Pembangungan Tanggal 16 Desember 2019 Gedung Laboratorium BBIL Mataram LIPI 192 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302002644 15 Maret 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 1.767.299.182 100% 1.767.299.182 14.418 122.575,89 berupa Pembayaran Termin IV Pekerjaan Pembangunan November 2019 Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium Dan Ruang Kerja Pusat Oseanografi Lipi 193 Component 1 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301002965 12 Maret 2021 Bendahara Pengeluaran 6.248.040 100% 6.248.040 14.418 433,35 Barang (PHLN-COREMAP-051) Dari Bendahara Pengeluaran (Jakarta) 194 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301003751 24 Maret 2021 Bendahara Pengeluaran 164.770.065 100% 164.770.065 14.446 11.405,93 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka kegiatan Reef Health Monitoring di Kabupaten Kepulauan Mentawai, Sumatera Barat, tanggal 29 Maret s.d 09 April 2021 195 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302003294 29 Maret 2021 1416/IPK.2.03/LK/V/2019, 10 PT. Wahana Cipta Bangunwisma 67.345.339 100% 67.345.339 14.481 4.650,60 berupa pembayaran termin II Pekerjaan Jasa Konsultansi Mei 2019 Manajemnen Konstruksi Pembangunan Gedung pusat data nasional ekosistem pesisir, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 196 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302003319 30 Maret 2021 3913/IPK.2.03/LK/XI/2019 , 11 APIK BSP-KSO 2.391.845.885 100% 2.391.845.885 14.481 165.171,32 berupa Pembayaran termin V, Pekerjaan Pembangunan November 2019 Gedung Pusat Data Nasional Ekosistem Pesisir Laboratorium Dan Ruang Kerja Pusat Oseanografi LIPI 197 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301004547 7-Apr-2021 106.028.059 100% 106.028.059 14.513 7.305,73 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti kegiatan uji kompetensi di Tempat Uji Kompetensi (TUK) Sewaktu Universitas Bangka Belitung tanggal 8 s.d. 12 April 2021 198 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301004910 13-Apr-2021 194.110.062 100% 194.110.062 14.631 13.267,04 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka pelaksanaan Reef Health Monitoring RHM), tanggal 21 April s.d 01 Mei 2021, di Kabupaten Raja Ampat, Batanta Salawati 199 Component 1 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701002863 13-Apr-2021 17.982.084 100% 17.982.084 14.631 1.229,04 Barang (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20032 Tanggal 12 April 2021 200 Component 1 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004747 8-Apr-2021 44.090.957 100% 44.090.957 14.631 3.013,53 Barang (PHLN,COREMAP,051) dari BP Pusat Jakarta Sesuai SPP Nomor 20025 Tanggal 8 April 2021 201 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002962 15-Apr-2021 48.371.869 100% 48.371.869 14.633 3.305,67 barang (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20041 Tanggal 15 April 2021 202 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002959 14-Apr-2021 470.903.841 100% 470.903.841 14.633 32.180,95 barang (PHLN,COREMAP,051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20039 Tanggal 14 April 2021 203 Component 1 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701003013 15-Apr-2021 2.724.747 100% 2.724.747 14.508 187,81 Modal (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 10010 Tanggal 14 April 2021 204 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302004799 26-Apr-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 2.557.936.163 100% 2.557.936.163 14.489 176.543,32 berupa Pembayaran Termin VI, Pekerjaan Jasa Tanggal 11/11/2019 Konstruksi PembangunanGedung Pusat Data Nasional Ekosistem Pesisir Laboratoiun dan Ruang kerja Pusat Oseanografi LIPI, 205 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301006093 28-Apr-2021 250.192.012 100% 250.192.012 14.510 17.242,73 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Pelatihan Asesor Kompetensi TA 2021 bersama Badan Nasional Sertifikasi Profesi (BNSP) tanggal 29 April s.d. 5 Mei 2021 di Bali 206 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301006505 4-May-2021 136.272.051 100% 136.272.051 14.467 9.419,51 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti survei kegiatan pengambilan data guna penyusunan kajian akademis ICRG PES, tanggal 5 s.d. 11 Mei 2021 di Perairan Nusa Dua Bali 207 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881303005006 3-May-2021 0758/PPK/IV/PK/KU/4/2021 PT. GRAND KOMODO TOURS 158.999.998 100% 158.999.998 14.467 10.990,53 berupa pembayaran Pengadaan Jasa Sewa Kapal untuk tanggal 15 April 2021 kegiatan Penelitian Reef Health Monitoring secara Live On Boards di Raja Ampat Koordinator Ni Wayan Purnamasari P2O LIPI 208 Component 1 Penggantian UP untuk keperluan belanja barang LIPI 210881301007249 11-May-2021 3.187.025 100% 3.187.025 14.198 224,47 (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 20060 Tanggal 11 Mei 2021 209 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005294 11-May-2021 5.300.539 100% 5.300.539 14.198 373,33 barang (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 20058 Tanggal 11 Mei 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 210 Component 1 Pembayaran Belanja Modal (PHLN,COROEMAP,051) LIPI 210881303006016 11-May-2021 0941/PPK/IV/PK/KU/4/2021 PT. TRIASIH CIPTA JAYA 74.250.003 100% 74.250.003 14.198 5.229,61 berupa pembayaran Pengadaan Komputer Pendukung tanggal 27 April 2021 Proses Data Pusat Penelitian Oseanografi LIPI sesuai SPK No: 0941/PPK/IV/PK/KU/4/2021 tanggal 27 April 2021, 211 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007073 10-May-2021 54.974.940 100% 54.974.940 14.198 3.872,02 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka dalam Kegiatan RHM CoremapCTI tanggal 18 s.d. 24 Mei 2021 dkk ke Pulau Pari, a.n. Susi Rahmawati,dkk 212 Component 1 Penggantian UP untuk Keperluan Belanja Barang LIPI 210881301006871 6-May-2021 32.905.995 100% 32.905.995 14.198 2.317,65 (PHLN,COREMAP,051) dari Bendahara Pengeluaran Pusat- Jakarta Sesuai SPP Nomor 20052 Tanggal 5 Mei 2021 213 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005434 17-May-2021 59.263.154 100% 59.263.154 14.203 4.172,58 barang (PHLN,COREMAP,051), dari BPP.5 P2O Jakarta Sesuai SPP Nomor 20063 Tanggal 17 Mei 2021 214 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005431 17-May-2021 3.003.508 100% 3.003.508 14.203 211,47 Modal (PHLN,COREMAP,051) dari BPP.4 Mataram, Sesuai SPP Nomor 10014 Tanggal 17 Mei 2021 215 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005438 17-May-2021 131.945.018 100% 131.945.018 14.203 9.289,94 barang (PHLN,COREMAP,051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20066 Tanggal 17 Mei 2021 216 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007900 24-May-2021 222.041.978 100% 222.041.978 14.362 15.460,38 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Mengikuti Kegiatan Monitoring Kesehata n Terumbu Karang dan Ekosistem Terkait (RHM) di Kepulauan Derawan, Berau, Kalimantan Timur, 217 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302006336 20-May-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 2.557.936.255 100% 2.557.936.255 14.362 178.104,46 berupa Pembayaran Termin VII Pekerjaan Pembangunan Tanggal 11/11/2019 Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI 218 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007668 21-May-2021 443.690.005 100% 443.690.005 14.362 30.893,33 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Kegiatan Reef Health Monitoring Coremap-CTI ke Batam Kepulauan RIau dan Kepulauan Buton sesuai Surat Tugas nomor B-3801/II/TU.01.01/5/2021 219 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007995 27-May-2021 140.061.987 100% 140.061.987 14.310 9.787,70 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Mengikuti kegiatan sertifikasi kompetensi di Tempat Uji Kompetensi (TUK) Sewaktu, Universitas Sam Ratulangi, Manado, Sulawesi Utara, 220 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302006753 28-May-2021 34/IGP/K/IV/2021 tanggal 29 CV. Indo Graha Persada 44.737.067 100% 44.737.067 14.310 3.126,28 Berupa Pengadaan bahan untuk keperluan Pelatihan April 2021 Asesor Kompetensi P2O LIPI Koord; Triyono, M.Si., sesuai Kwitansi Nomor: 34/IGP/K/IV/2021 tanggal 29 April 2021 221 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301008854 8-Jun-2021 46.612.067 100% 46.612.067 14.262 3.268,27 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan verifikasi Tempat Uji Kompetensi (TUK) di Univeritas Trunojoyo Madura tanggal 9 s.d 12 Juni 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 222 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301009053 9-Jun-2021 25.757.029 100% 25.757.029 14.262 1.805,99 perjalanan dinas (PHLN,COREMAP,051) dalam rangka menghadiri Kegiatan FGD dan Penyusuan Final Draft Kajian Akademis PES ICRG, tanggal 9 s.d. 10 Juni 2021 di Bogor, Jawa Barat 223 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301009105 9-Jun-2021 158.397.952 100% 158.397.952 14.222 11.137,53 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan pengambilan data monitoring kesehatan terumbu karang dan ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) Kota Sabang 224 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301009363 14-Jun-2021 270.129.966 100% 270.129.966 14.222 18.993,81 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka monitoring safeguard kegiatan Reef Health Monitoring (RHM) Coremap-CTI di Perairan Pulau Weh dan kegiatan RHM Ternate tanggal 13 s.d. 17 Juni 2021 225 Component 1 Pembayaran Belanja barang berupa pembayaran LIPI 210881301009398 14-Jun-2021 240.393.044 100% 240.393.044 14.222 16.902,90 perjalanan dinas (PHLN,COREMAP,051) dalam rangka kegiatan Pelatihan Penilaian Kondisi Terumbu Karang dan Uji Kompetensi (TUK) Sewaktu tanggal 13 s.d. 22 Juni 2021 di Universitas Bangka Belitung 226 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301009725 16-Jun-2021 24.045.999 100% 24.045.999 14.257 1.686,61 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka Menghadiri kegiatan monitoring dan evaluasi program restorasi terumbu karang 227 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008269 18-Jun-2021 723.008.579 100% 723.008.579 14.453 50.024,81 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20092 Tanggal 18 Juni 2021 228 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008433 21-Jun-2021 12.031.689 100% 12.031.689 14.453 832,47 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20095 Tanggal 18 Juni 2021 229 Component 1 Pembayaran belanja barang berupa perjalanan dinas LIPI 210881301009948 18-Jun-2021 250.191.981 100% 250.191.981 14.453 17.310,73 (PHLN,COREMAP,051) paket meeting Luar Kota kegiatan pelatihan asesor kompetensi 2021 tanggal 29 April s.d. 5 Mei 2021 di Nusa Dua Bali 230 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302008163 22-Jun-2021 105/AMP-LIPI/Faktur/VI/2021 PT Arsi Mandiri Putra 45.513.541 100% 45.513.541 14.421 3.156,06 berupa Pembayaran Biaya Pekerjaan Pengadaan Bahan tanggal 18 Juni 2021 Kegiatan Uji Kompetensi Skema Penilai Kondisi Terumbu Karang di TUK FPPB Universitas Bangka Belitung 231 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301010417 24-Jun-2021 295.890.002 100% 295.890.002 14.454 20.471,15 perjalanan dinas (PHLN, COREMAP,051) dalam rangka kegiatan survey kesehatan terumbu karang (RHM) coremap-CTI ke Natuna Kepulauan Riau tanggal 28 Juni s.d. 9 Juli 2021 232 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302008477 29-Jun-2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 555.239.120 100% 555.239.120 14.472 38.366,44 berupa pembayaran termin VIII Pembangunan Gedung Tanggal 11/11/2019 Pusat Data Nasional Ekosistem Pesisir Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI, sesuai SPK Nomor: 3913/IPK.2.03/LK/XI/2019 233 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301011312 08/07/2021 Bendahara Pengeluaran 196.478.300 100% 196.478.300 14.548 13.505,52 Perjalanan Dinas (PHLN,COREMAP,051) dalam rangka mengikuti kegiatan RHM COREMAP di Kota Kendari, Sulawesi Tenggara tanggal 8 s.d. 17 Juli 2021, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 234 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301012213 22/07/2021 Bendahara Pengeluaran 164.370.000 100% 164.370.000 14.554 11.293,80 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka pengambilan data monitoring kesehatan terumbu karang ekosistem terkait lainnya dalam Reef Health Monitoring (RHM) 235 Component 1 Pertanganggungjawaban TUP untuk keperluan belanja LIPI 210881701010847 27/07/2021 Bendahara Pengeluaran 31.000.000 100% 31.000.000 14.494 2.138,82 Modal (PHLN,COREMAP, 051) dari BPP.2 Cibinong, Sesuai SPP Nomor 10018 Tanggal 26 Juli 2021 236 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302009782 23/07/2021 3913/IPK.2.03/LK/XI/2019 APIK BSP-KSO 3.654.194.600 100% 3.654.194.600 14.494 252.117,75 Berupa Pembayaran termin IX (Retensi) Pekerjaan Tanggal 11/11/2019 Pembangunan Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan RUang Kerja Pusat Penelitian Oseanografi LIPI 237 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010930 28/07/2021 Bendahara Pengeluaran 929.388.920 100% 929.388.920 14.498 64.104,63 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20114 Tanggal 27 Juli 2021 238 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301012705 30/07/2021 Bendahara Pengeluaran 38.145.000 100% 38.145.000 14.342 2.659,67 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan riset di bawah Reef Health Monitoring COREMAP CTI Eksperimen Restorasi Lamun di Pulau Pari Kepualauan Seribu 239 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302010248 02/08/2021 2690/IPK.2.03/LK/VI/2018 PT.JAKARTA KONSULTINDO 242.790.000 100% 242.790.000 14.342 16.928,60 berupa Pembayaran tahap IV Pekerjaan Pengadaan jasa tanggal 25 Juni 2018 konsultansi perencanaan DED dan UKL-UPL Pemba ngunan gedung pusat data nasional ekosistem pesisir, laboratorium dan ruang kerja P2O LIPI 240 Component 1 Pembayaran belanja barang berupa pembayaran LIPI 210881301014173 18/08/2021 Bendahara Pengeluaran 105.875.000 100% 105.875.000 14.383 7.361,12 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti survei kegiatan riset dan pengembangan monitoring kesehatan terumbu karang dan ekosistem terkait COREMAP CTI tahun kegiatan 2021-2022 241 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301014040 18/08/2021 Bendahara Pengeluaran 123.420.000 100% 123.420.000 14.383 8.580,96 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan menindak lanjuti proses proses pembentukan BLUD ICRG PES di Bali 242 Component 1 embayaran Belanja Modal (PHLN,COREMAP,051) berupa LIPI 210881303012168 23/08/2021 1585/PPK/IV/PK/KU/5/2021 PT. DATASCRIP 81.568.181 100% 81.568.181 14.415 5.658,56 Pembayaran Pengadaan Belanja Modal Peralatan dan tanggal 21 Juni 2021 Mesin Berupa Meubelair Perkantoran BBIL (Paket 3) Pembiayaan Coremap CTI sesuai Surat Pesanan Nomor: 1585/PPK/IV/PK/KU/5/2021 tanggal 21 Juni 2021 243 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301014665 25/08/2021 Bendahara Pengeluaran 63.213.000 100% 63.213.000 14.408 4.387,35 Perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan verifikasi Tempat Uji Kompetensi (TUK) ke Universitas Pattimura Ambon tanggal 24 s.d. 29 Agustus 2021 244 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301014625 25/08/2021 Bendahara Pengeluaran 54.900.000 100% 54.900.000 14.408 3.810,38 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka mengikuti kegiatan Study Banding Pengembangan Model AI Untuk Analisa Data Foto Terumbu Karang di Universitas Udayana dan LINI, Bali 245 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,LIPI) LIPI 210881303012407 25/08/2021 Nomor: SEJAHTERA BALI FURINDO PT 46.233.727 100% 46.233.727 14.408 3.208,89 berupa E-Purchasing Pengadaan Belanja Modal Peralatan 1621/PPK/IV/PK/KU/5/2021 dan Mesin Berupa Meubelair Perkantoran BBIL, sesuai tanggal 24 Mei 2021 Surat Pesanan Nomor: 1621/PPK/IV/PK/KU/5/2021 tanggal 24 Mei 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 246 Component 1 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301014701 26/08/2021 Bendahara Pengeluaran 23.400.000 100% 23.400.000 14.408 1.624,10 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti Survei kegiatan riset dan pengemba ngan monitoring kesehatan terumbu karang dan ekosistem terkait tahun kegiatan 2021-2022 247 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013075 30/08/2021 Bendahara Pengeluaran 297.904.055 100% 297.904.055 14.374 20.725,20 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta, Sesuai SPP Nomor 20136 Tanggal 30 Agustus 2021 248 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301014874 27/08/2021 Bendahara Pengeluaran 241.047.000 100% 241.047.000 14.374 16.769,65 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan pelatihan Recognition Current Competency (RCC) di Semarang tanggal 29 Agustus s.d. 5 September 2021 249 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303012553 30/08/2021 2026/PPK/IV/PK/KU/8/2021 CV. FAJAR LAKSANA 90.750.000 100% 90.750.000 14.374 6.313,48 berupa Pembayaran Pengadaan Belanja Modal Peralatan tanggal 2 Agustus 2021 Pendukung Laboratorium Balai Bio Industri Laut (BBIL) 250 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303012997 02/09/2021 0742/PPK/IV/PK/KU/5/2021 PT.Dekoruma Niaga Sejahtera 83.002.500 100% 83.002.500 14.284 5.810,87 Berupa Permbayaran Jasa Konsultansi Pekerjaan tanggal 17 Mei 2021 Perencana Interior Desain Gedung Pusat Data Nasional Ekosistem Pesisir, Laboratorium dan Ruang Kerja Pusat Penelitian Oseanografi LIPI 251 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302012290 06/09/2021 1909/PPK/IV/PK/KU/7/2021 CV.AKBAR ABADI JAYA 40.000.000 100% 40.000.000 14.261 2.804,85 berupa Pengadaan Pekerjaan Pintu Pagar Gedung BBIL tanggal 16 Juli 2021 LIPI Mataram, sesuai Surat Pesanan Nomor: 1909/PPK/IV/PK/KU/7/2021 tanggal 16 Juli 2021 252 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301015704 08/09/2021 Bendahara Pengeluaran 187.428.000 100% 187.428.000 14.272 13.132,57 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Melakukan kegiatan penelitian Kondisi Ekosistem Terumbu Karang dan Ekosistem terkait di Perairan Maumere, Kabupatenm Sikka 253 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013973 10/09/2021 Bendahara Pengeluaran 54.466.471 100% 54.466.471 14.272 3.816,32 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta 254 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301015571 07/09/2021 Bendahara Pengeluaran 82.514.000 100% 82.514.000 14.272 5.781,53 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan Pemantauan Kegiatan Monitoring Kesehatan Terumbu Karang dan Ekosistem Terkait (COREMAP CTI) di Kabupaten Sikka, NTT 255 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303014007 15-Sep-2021 1731/PPK/IV/PK/KU/6/2021 PT HOME CENTER INDONESIA 466.226.000 100% 466.226.000 14.155 32.937,20 berupa pembayaran Pengadaan Belanja Modal Peralatan tanggal 29 Juni 2021 dan Mesin Berupa Meubelair Perkantoran BBIL (Paket 1) Pembiayaan Coremap-CTI Tahun Anggaran 2021 256 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015360 29-Sep-2021 Bendahara Pengeluaran 536.061.550 100% 536.061.550 14.155 37.870,83 barang (PHLN, COREMAP, 051) dari BP Pusat Jakarta 257 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016763 21-Sep-2021 Bendahara Pengeluaran 24.372.000 100% 24.372.000 14.165 1.720,58 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka mengikuti kegiatan Studi Budidaya dan Pengem bangan Teknik Reproduksi Aseksual Pada Karang Hias 258 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881301019130 18-Oct-2021 Bendahara Pengeluaran 152.426.000 100% 152.426.000 14.165 10.760,75 berupa Perjalanan Dinas dalam rangka mengikuti kegiatan RHM COREMAP di Lombok Barat, NTB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 259 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881301017076 24-Sep-2021 88.KW/FHK/IX/2021 Tanggal CV FAJRI HUTAMA KARYA 25.060.500 100% 25.060.500 14.165 1.769,18 berupa Pembayaran Pengadaan Bahan Penelitian RHM 22 September 2021 Sumba Timur (Koordinator Tri Aryono) sesuai kwitansi Nomor 88.KW/FHK/IX/2021 Tanggal 22 September 2021 260 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302013417 24-Sep-2021 47/K/AJM/IX/2021 tanggal 17 CV. ALSABIL JAYA MANDIRI 15.112.000 100% 15.112.000 14.165 1.066,85 berupa pembayaran Pengadaan Bahan Penelitian RHM September 2021 Tual Maluku Utara (Koordinator Teddy Triandiza) sesuai Kwitansi Nomor 47/K/AJM/IX/2021 tanggal 17 September 2021 261 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303016311 13-Oct-2021 2569/PPK/IV/PK/KU/9/2021 PT Airmas Mataram Internusa 68.767.273 100% 68.767.273 14.165 4.854,73 berupa pembayaran e purchasing pengadaan belanja tanggal 3 September 2021 modal perlatan mesih berupa papan tulis digital sesuai dengan SPK No: 2569/PPK/IV/PK/KU/9/2021 tanggal 3 September 2021 262 Component 1 Penggantian UP untuk keperluan belanja barang LIPI 210881301016766 21-Sep-2021 Bendahara Pengeluaran 32.573.000 100% 32.573.000 14.165 2.299,54 (PHLN,COREMAP,051) dari BP Pusat Jakarta 263 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881303014806 28-Sep-2021 2227/PPK/IV/PK/KU/8/2021 PT. COMFINDO MITRA PRIMA 48.430.000 100% 48.430.000 14.165 3.418,99 berupa Pengadaan Spare Parts Laminar Air Flow untuk tanggal 26 Agustus 2021 Lab Mikrobiologi P2O LIPI, sesuai dengan Surat Pesanan Nomor 2227/PPK/IV/PK/KU/8/2021 tanggal 26 Agustus 2021 264 Component 1 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301017228 28-Sep-2021 Bendahara Pengeluaran 276.212.000 100% 276.212.000 14.165 19.499,61 perjalanan dinas (PHLN, COREMAP,051) dalam rangka melakukan survey kegiatan RHM COREMAP CTI di Kabupaten Sumba Timur NTT, tanggal 30 September s.d. 11 Oktober 2021 265 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302013528 28-Sep-2021 143-SBA/KW/IX/2021 tanggal 7 PT. SARANA BUJANA ARTA 34.500.000 100% 34.500.000 14.165 2.435,58 berupa Pembayaran Jasa Pemindahan genset dari P2O September 2021 LIPI ke Stasiun Pulau Pari, sesuai dengan Kwitansi Nomor 143-SBA/KW/IX/2021 tanggal 7 September 2021 266 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017070 24-Sep-2021 Bendahara Pengeluaran 16.250.000 100% 16.250.000 14.165 1.147,19 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan Monitoring Kegiatan ICRG COREMAP CTI (M.Abrar) tanggal 25 s.d. 29 September 2021 di Bali 267 Component 1 Pembayaran Belanja Modal (PHLN,COREMPA,051) LIPI 210881303015467 5-Oct-2021 2565/PPK/IV/PK/KU/9/2021 PT Airmas Mataram Internusa 74.597.273 100% 74.597.273 14.165 5.266,31 berupa pembayaran E-Purchasing Pengadaan Belanja tanggal 03 september 2021 Modal Peralatan dan Mesin Berupa UPS, sesuai dengan SP SPK No: 2565/PPK/IV/PK/KU/9/2021 tanggal 03 september 2021 268 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015597 30-Sep-2021 Bendahara Pengeluaran 1.164.615 100% 1.164.615 14.165 82,22 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta, 269 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017340 29-Sep-2021 Bendahara Pengeluaran 229.282.000 100% 229.282.000 14.165 16.186,52 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka melaksananan kegiatan RHM COREMAP CTI di Kepulauan Kei Maluku tanggal 2 s.d. 12 Oktober 2021 270 Component 1 Pembayaran Belanja Modal (PHN,COREMAP,051) berupa LIPI 210881302014054 5-Oct-2021 2481/PPK/IV/PK/KU/9/2021 PT Elo Karsa Utama 20.412.727 100% 20.412.727 14.165 1.441,07 pembayaran e-Purchasing Belanja Modal Perlatan dan tanggal 6 September 2021 Mesin berupa Micropippet Multichannel 271 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302013047 17-Sep-2021 2374/PPK/IV/IPK/KU/8/2021 PT. Sunindo Indah Hotel Corp 91.120.000 100% 91.120.000 14.165 6.432,76 berupa Pengadaan Paket Meeting Dalam Rangka tanggal 30 Agustus 2021 kegiatan pelatihan Recognition of current competency Lembaga Sertifikasi Profesi, Pusat Penelitian Oseanografi 1 2 3 4 5 6 7 8 9 10 11 12 13 14 272 Component 1 Pembayaran Belanja modal (PHLN,COREMAP,051) LIPI 210881303015594 6-Oct-2021 2668/PPK/IV/PK/KU/9/2021 PT Mitra Mantari 51.971.055 100% 51.971.055 14.165 3.668,98 berupa E purchasing pengadaan belanja modal peralatan tanggal 13 September 2021 mesin berupa instrument cabinet BBIL Mataram sesuai SPK Nomor 2668/PPK/IV/PK/KU/9/2021 tanggal 13 September 2021 273 Component 1 Penggantian UP untuk keperluan belanja barang LIPI 210881301018323 11-Oct-2021 Bendahara Pengeluaran 676.000 100% 676.000 14.165 47,72 (PHLN,COREMAP, 051) dari BPP.4 Mataram 274 Component 1 Pembayaran Belanja modal (PHLN,COREMAP,051) LIPI 210881302014819 14-Oct-2021 2601/PPK/IV/PK/KU/9/2021 PT Elo Karsa Utama 98.181.818 100% 98.181.818 14.165 6.931,30 berupa E Purchasing Pengadaan belanja modal Peralatan tanggal 10 September 2021 dan Mesin Berupa Biosafety cabinet, sesuai dengan Surat Pesanan Nomor 2601/PPK/IV/PK/KU/9/2021 tanggal 10 September 2021 275 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701014363 15-Sep-2021 Bendahara Pengeluaran 2.815.000 100% 2.815.000 14.165 198,73 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 276 Component 1 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301018627 13-Oct-2021 Bendahara Pengeluaran 67.678.000 100% 67.678.000 14.165 4.777,83 Perjalanan Dinas (PHLN, COREMAP,051) dalam rangka kegiatan Visiting ke penangkaran karang hias dalam rangka Pengembangan Panduan Batas Maksimum Produksi (BMP) karang hias di BALI 277 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) LIPI 210881303016804 19-Oct-2021 1243934654 tanggal 1 Oktober PT HOME CENTER INDONESIA 23.790.000 100% 23.790.000 14.165 1.679,49 berupa e purchasing pengadaan belanja modal peralatan 2021 dan mesin berupa rak penyimpanan sesuai dengan kuitansi nomor 1243934654 tanggal 1 Oktober 2021 278 Component 1 Penggantian UP untuk keperluan belanja barang (PHLN, LIPI 210881301018322 11-Oct-2021 Bendahara Pengeluaran 8.218.000 100% 8.218.000 14.165 580,16 COREMAP, 051) dari BPP.4 Mataram 279 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881301020276 01-Nov-21 2230/PPK/IV/PK/KU/8/2021 PT. Dexatama Niaga Labtekindo 1.520.000.000 100% 1.520.000.000 14.261 106.584,39 berupa Pengadaan Belanja Modal Peralatan dan Mesin tanggal 24 Agustus 2021 Berupa Furniture Laboratorium Bio Industri Laut sesuai dengan SPK No 2230/PPK/IV/PK/KU/8/2021 tanggal 24 Agustus 2021 280 Component 1 embayaran Belanja Barang (PHLN,COREMAP,051) berupa LIPI 210881302015717 29-Oct-2021 KW/126/MN/X/2021 tanggal CV. Mega Niaga 14.756.000 100% 14.756.000 14.261 1.034,71 pembayaran pengadaan bahan penelitian RHM Lampung 27 Oktober 2021 Koordinator Tri Aryono sesuai dengan kwitansi nomor KW/126/MN/X/2021 tanggal 27 Oktober 2021 281 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302015711 29-Oct-2021 106/KW/PHJ/X/2021 tanggal CV. Putra Harapan Jaya 20.495.000 100% 20.495.000 14.261 1.437,14 berupa pembayaran Pengadaan bahan penelitian RHM 27 Oktober 2021 Lombok Barat NTB Koordinator Bayu Perisha, sesuai dengan kwitansi nomor 106/KW/PHJ/X/2021 tanggal 27 Oktober 2021 282 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303019119 12-Nov-21 K211101/C tanggal 1 PT. New Module International 226.363.636 100% 226.363.636 14.243 15.892,97 berupa e purchasing pengadaan belanja modal peralatan Nopember 2021 dan mesin berupa mikroskop fluorescence dan kamera mikroskop, sesuai dengan Kontrak Nomor: 2615/PPK/IV/PK/KU/9/2021 Tanggal 13 September 2021 283 Component 1 Pembayaran Belanja Modal(PHLN,COREMAP,051) berupa LIPI 210881303019087 12-Nov-21 K211101/C tanggal 1 PT. New Module International 35.700.000 100% 35.700.000 14.243 2.506,49 Pengadaan belanja modal peralatan dan mesin berupa Nopember 2021 Nikon Imaging Software sesuai dengan kwitansi nomor K211101/C tanggal 1 Nopember 2021 284 Component 1 Penggantian UP untuk keperluan belanja modal LIPI 210881301021629 15-Nov-21 Bendahara Pengeluaran 18.711.649 100% 18.711.649 14.243 1.313,74 (PHLN,COREMAP,051) dari BP Pusat Jakarta 1 2 3 4 5 6 7 8 9 10 11 12 13 14 285 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701020450 16-Nov-21 Bendahara Pengeluaran 210.968.564 100% 210.968.564 14.211 14.845,44 barang (PHLN,COREMAP, 051) dari BP Pusat Jakart 286 Component 1 Pembayaran Belanja modal (PHLN,COREMAP,051) LIPI 210881301022164 19-Nov-21 KWT 202101060 Tanggal 12 PT. Emiindo Jaya Bersama 39.077.273 100% 39.077.273 14.231 2.745,93 berupa permbayaran e purchasing belanja modal November 2021 peralatan dan mesin berupa UV Sterilizer, sesuai dengan Kwitansi Nomor KWT 202101060 Tanggal 12 November 2021 287 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303019796 19-Nov-21 1244036429 tanggal 15 PT. Home Center Indonesia 12.530.000 100% 12.530.000 14.231 880,47 berupa e purchasing belanja modal peralatan dan mesin November 2021 berupa loker dan meja tamu,sesuai dengan kuitansi Nomor 1244036429 tanggal 15 November 2021, 288 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021961 29-Nov-21 Bendahara Pengeluaran 477.050.577 100% 477.050.577 14.280 33.406,90 barang (PHLN,COREMAP, 051) dari BP Pusat Jakarta 289 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021963 29-Nov-21 Bendahara Pengeluaran 163.257.000 100% 163.257.000 14.280 11.432,56 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 290 Component 1 pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881301023250 30-Nov-21 Bendahara Pengeluaran 400.603.000 100% 400.603.000 14.340 27.936,05 berupa perjalanan dinas dalam rangka kegiatan sertifikasi penilai kondisi padang lamun dan komunitas mangroove di univ. pattimura ambon dan univ. hasanuddin makassar 291 Component 1 embayaran Belanja Modal (PHLN,COREMAP,051) berupa LIPI 210881302017971 30-Nov-21 2823/PPK/IV/PK/KU/9/2021 PT. ASTRAGRAPHIA XPRINS 145.409.091 100% 145.409.091 14.340 10.140,10 e purchasing belanja modal peralatan dan mesin berupa Tanggal 24 September 2021, INDONESIA Smart TV digital signage, sesuai dengan SPK Nomor: 2823/PPK/IV/PK/KU/9/2021 Tanggal 24 September 2021, 292 Component 1 ertanggungjawaban TUP utnuk keperluan belanja barang LIPI 210881701022037 30-Nov-21 Bendahara Pengeluaran 8.800.000 100% 8.800.000 14.340 613,67 (PHLN,COREMAP, 051) dari BPP.4 Mataram 293 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881301023875 3-Dec-2021 Bendahara Pengeluaran 611.655.000 100% 611.655.000 14.348 42.629,98 berupa perjalanan dinas dalam rangka kegiatan Konsinyering Data RHM serta Workshop Evaluasi Kegiatan RHM dan Inisiasi Jejaring pada tanggal 2 s.d. 9 Desember 2021 294 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701022653 2-Dec-2021 Bendahara Pengeluaran 406.788.052 100% 406.788.052 14.348 28.351,55 barang (PHLN,COREMAP, 051) dari BPG Pusat Jakarta 295 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) LIPI 210881303020933 1-Dec-2021 3517/PPK/IV/PK/KU/10/2021 CV. Wisata Karya 198.413.000 100% 198.413.000 14.348 13.828,62 berupa pengadaan Tirai Roler Blind dan Smoke ring Tanggal 28 Oktober 2021 Gorden Gedung balai bio industri laut sesuai dengan SPK No 296 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303021282 2-Dec-2021 3861/PPK/IV/PK/KU/11/2021 PT. Triasih Cipta Jaya 185.000.000 100% 185.000.000 14.348 12.893,78 pengadaan Belanja Modal Peralatan dan mesin berupa Tanggal 15 Nopember 2021 Perangkat pengolah data 297 Component 1 Pembayaran Belanja barang (PHLN,COREMAP,051) LIPI 210881304001481 8-Dec-2021 SPK Nomor: UNPATTI Ambon 199.360.000 100% 199.360.000 14.348 13.894,62 berupa Paket Pengadaan Swakelola Jasa Live On Board 3469/PPK/IV/PK/KU/10/2021 RHM di Teluk Cendrawasih Tanggal 29 Oktober 2021, 298 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302019360 10-Dec-2021 SPK Nomor: PT. Elo Karsa Utama 115.454.545 100% 115.454.545 14.378 8.029,94 berupa e purchasing pengadaan belanja modal Peralatan 3768/PPK/IV/PK/KU/11/2021 dan mesin berupa Bio Safety Cabinet sesuai Tanggal 11 Nopember 2021 299 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302019513 13-Dec-2021 kwitansi Nomor CV. Almira Karabela 37.081.000 100% 37.081.000 14.378 2.579,01 berupa pengadaan bahan kegiatan uji kompetensi lamun 45/K/AK/XI/2021 tanggal 9 di TUK Universitas mataram November 2021 300 Component 1 pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302019527 13-Dec-2021 Kwitansi nomor CV. Glory Heart 47.832.000 100% 47.832.000 14.378 3.326,75 berupa pengadaan bahan kegiatan sertifikasi skema 66/GH/K/XI/2021 tanggal 25 padang lamun di universitas pattimura, November 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 301 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302019524 13-Dec-2021 kwitansi nomor CV. Inovasi Multi Kreasi 34.136.000 100% 34.136.000 14.378 2.374,18 berupa pengadaan bahan konsinyering data RHM dan 080/K/IMK/XII/2021 tanggal 1 workshop evaluasi RHM COREMAP CTI 2021, Desember 2021 302 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302019512 13-Dec-2021 kwitansi nomor 096/K/CV- CV. Pancuran Emas Jaya 43.109.000 100% 43.109.000 14.378 2.998,26 berupa pengadaan bahan kegiatan sertifikasi kompetensi PEJ/XI/2021 tanggal 18 skemaMangrove dan Lamun di TUK Universitas November 2021 Diponegoro, 303 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023693 14-Dec-2021 Bendahara Pengeluaran 599.061.725 100% 599.061.725 14.348 41.752,28 barang (PHLN,COREMAP, 051) dari BPP pusat Jakarta 304 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302019574 13-Dec-2021 Kontrak Nomor: Phoenix Hotel Yogyakarta 232.317.000 100% 232.317.000 14.348 16.191,59 berupa Pekat meeting konsinyering data RHM, 4071/PPK/IV/PK/KU/12/20 Workshop Evaluasi dan inisiasi jejaring RHM nasional serta pembahasan Renja anggaran Coremap 2022, 305 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) LIPI 210881302019575 14-Dec-2021 kwitansi nomor CV. Alsabil Jaya Mandiri 24.630.000 100% 24.630.000 14.348 1.716,62 berupa pengadaan bahan perlengkapan laboratorium 76/K/AJM/XII/2021 tanggal 10 Puslit Oseanografi LIPI, Desember 2021 306 Component 1 Pembelian Belanja Barang (PHLN,COREMAP,051) berupa LIPI 210881303022924 14-Dec-2021 KW018/RST/XII/21 tanggal 10 PT. Royal Sarana Teknika 19.500.000 100% 19.500.000 14.348 1.359,07 pengadaan jasa perbaikan lemari pendingin laboratorium Desember 2021 mikrobiologi P2O LIPI sesuai dengan kwitansi nomor KW018/RST/XII/21 tanggal 10 Desember 2021 307 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302019653 14-Dec-2021 1416/IPK.2.03/LK/V/2019, tgl PT. Wahana CiptA Bangunwisma 180.142.500 100% 180.142.500 14.348 12.555,23 berupa pembayaran pemeliha raan atas Pekerjaan 10 mei 2019 Pengadaan jasa konsultansi Manajemen Konstruski pembangunan Gedung Pusat Data Nasional Ekosistem pesisir, Laboratorium dan ruang kerja 308 Component 1 Pembayaran belanja modal (PHLN,COREMAP,051) LIPI 210881303023417 16-Dec-2021 2514/PPK/IV/PK/KU/9/2021 PT. DEXATAMA NIAGA 8.312.700.000 100% 8.312.700.000 14.337 579.807,49 berupa pengadaan belanja modal peralatan dan mesin Tanggal 7 September 2021 LABTEKINDO berupa peralatan riset oseanografi 309 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881302020006 17-Dec-2021 Kwitansi No 38/K/AK/X/2021 CV. Almira Karabela 34.063.000 100% 34.063.000 14.343 2.374,89 berupa peengadaan bahan kegiatan uji kompetensi tanggal 19 Oktober 2021 skema mangrove di TUK Fakultas pertanian Universitas Trunojoyo Madura 310 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024005 21-Dec-2021 SPK Nomor PT ESCO UTAMA 4.383.000.000 100% 4.383.000.000 14.349 305.456,83 berupa Pengadaan belanja modal peralatan dan mesin 4331/PPK/IV/PK/KU/12/2021 berupa alat Fume Hood, Tanggal 9 Desember 2021 311 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024136 22-Dec-2021 SPK Nomor CV. MEDIA GLOBAL MANDIRI 144.814.000 100% 144.814.000 14.349 10.092,27 berupa pengadaan Pengolah Data dan Komunikasi 3551/PPK/IV/PK/KU/11/2021 berupa Wifi, CCTV, dan Sound System Kedeputian Bidang Tanggal 1 Nopember 2021 IPK LIPI 312 Component 1 pembayaran belanja modal (PHLN,COREMAP,051) LIPI 210881303024072 22-Dec-2021 SPK Nomor CV. Wisata Karya 193.000.000 100% 193.000.000 14.349 13.450,42 berupa Pengadaan Furniture dan Kelengkapan Kantor 4202/PPK/IV/PK/KU/12/2021 BBIL Tanggal 1 Desember 2021, 313 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024293 27-Dec-2021 2447/PPK/IV/PK/KU/9/2021 PT KARYA MENTARI SERAYA 3.014.915.400 100% 3.014.915.400 14.219 212.034,28 berupa Pembayaran Termin II Pengadaan Belanja Modal Tanggal 3 September 2021 Peralatan dan Mesin Berupa Interior Laboratorium Gedung Pusat Nasional Ekosistem Pesisir 314 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024271 24-Dec-2021 2447/PPK/IV/PK/KU/9/2021 PT KARYA MENTARI SERAYA 3.014.915.401 100% 3.014.915.401 14.219 212.034,28 berupa Pembayaran Termin III Pengadaan Belanja Modal Tanggal 3 September 2021 Peralatan dan Mesin Berupa Interior Laboratorium Gedung Pusat Nasional Ekosistem Pesisir 315 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881303024308 27-Dec-2021 2447/PPK/IV/PK/KU/9/2021 PT KARYA MENTARI SERAYA 4.019.887.201 100% 4.019.887.201 14.225 282.593,12 berupa Pembayaran Termin I Pengadaan Belanja Modal Tanggal 3 September 2021 Peralatan dan Mesin Berupa Interior Laboratorium Gedung Pusat Nasional Ekosistem Pesisir 1 2 3 4 5 6 7 8 9 10 11 12 13 14 316 Component 1 Pembayaran belanja barang (PHLN,COREMAP,051) LIPI 210881303024303 27-Dec-2021 2598/PPK/IV/PK/KU/9/2021 PT. Trias Nathomi Chemindo 104.053.000 100% 104.053.000 14.225 7.314,80 berupa pekerjaan kalibrasi water furification Genetika, Tanggal 10 September 2021 317 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) LIPI 210881302020444 27-Dec-2021 2570/PPK/IV/PK/KU/9/2021 PT. Medquest jaya Global 96.988.182 100% 96.988.182 14.225 6.818,15 berupa e purchasing pengadaan belanja modal peralatan Tanggal 3 September 2021 mesin berupa Elisa Washer 318 Component 1 Penggantian UP untuk keperluan belanja barang LIPI 210881701027368 28-Dec-2021 Bendahara Pengeluaran 17.365.800 100% 17.365.800 14.237 1.219,76 (PHLN,COREMAP,051) dari BPP.5 P2O Jakarta 319 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028249 29-Dec-2021 Bendahara Pengeluaran 24.697.299 100% 24.697.299 14.265 1.731,32 barang (PHLN,COREMAP, 051) dari BPP.5 P2O Jakarta 320 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027966 29-Dec-2021 Bendahara Pengeluaran 2.050.000 100% 2.050.000 14.265 143,71 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 321 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027968 29-Dec-2021 Bendahara Pengeluaran 16.803.796 100% 16.803.796 14.265 1.177,97 barang (PHLN,COREMAP, 051) dari BPP.4 Mataram 322 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028506 30-Dec-2021 Bendahara Pengeluaran 107.350.900 100% 107.350.900 14.269 7.523,37 modal (PHLN,COREMAP, 051) dari BP Pusat Jakarta 323 Component 1 Penggantian uang persediaan untuk keperluan belanja LIPI 210881701028478 30-Dec-2021 Bendahara Pengeluaran 18.482.500 100% 18.482.500 14.269 1.295,29 barang (PHLN, COREMAP,051) dari BP Pusat Jakarta 324 Component 1 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701029685 3-Jan-2022 Bendahara Pengeluaran 378.357.834 100% 378.357.834 14.278 26.499,36 barang (PHLn,COREMAP, 051) dari BP Pusat Jakarta 325 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881303015225 4-Oct-21 2447/PPK/IV/PK/KU/9/2021 PT Karya Mentari Seraya 2.512.429.500 100% 2.512.429.500 14.096 178.237,05 berupa pembayaran Uang muka pengadaan belanja tanggal 3 September 2021 modal peralatan dan mesin berupa interior Laboratorium Gedung pusat data nasional ekosistem pesisir 326 Component 1 Pembayaran Belanja Barang berupa pembayaran 210881301018110 7-Oct-21 Bendahara Pengeluaran 284.697.000 100% 284.697.000 14.096 20.197,01 perjalanan dinas (PHLN, COREMAP,051) dalam rangka Mengikuti kegiatan sertifikasi kompetensi skema penilai kondisi padang lamun dan komunitas mangrove (Triyono) di UMRAH - Tanjung Pinang 327 Component 1 Pembayaran Belanja Barang (PHLN,COREMAP,051) 210881301019527 22-Oct-2021 Bendahara Pengeluaran 108.339.000 100% 108.339.000 14.165 7.648,36 berupa perjalanan dinas dalam rangka Melaksanakan kegiatan sertifikasi kompetensi skema Penilaian Komunitas Mangrove di Univ. Trunojoyo Madura 328 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881303016807 19-Oct-2021 0079/GTP/X/2021 tanggal 4 CV Graha Tri Putra 49.500.000 100% 49.500.000 14.165 3.494,53 berupa Pengadaan Jasa Pembuatan Aplikasi MonMang Oktober 2021 2.0 versi iOS sesuai dengan kwitansi Nomor 0079/GTP/X/2021 tanggal 4 Oktober 2021 329 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,051) 210881302015386 25-Oct-2021 2364/PPK/IV/PK/KU/8/20 PT. Interkineksi Izzi Konsultan 76.075.000 100% 76.075.000 14.165 5.370,63 berupa Pembayaran Jasa Konsultansi Pekerjaan Perencanaan Interior Desain Gedung Pulau Pari dan Ruang Kepala Organisasi Riset Kebumian Deputi Bidang IPK LIPI 330 Component 1 Pembayaran Belanja Modal (PHLN,COREMAP,015) 210881303017252 25-Oct-2021 2571/PPK/IV/PK/KU/9/2021 PT. Bhinneka Mentari Dimensi 15.454.545 100% 15.454.545 14.165 1.091,04 berupa E-Purchasing Pengadaan Belanja Modal Peralatan Tanggal 8 September 2021 dan Mesin Berupa UPS 3KVA, sesuai Surat Pesanan Nomor 2571/PPK/IV/PK/KU/9/2021 Tanggal 8 September 2021 TOTAL EXPENDITURES 87.030.434.451 100% 87.030.434.451 14.293 6.089.129,81 LAMPIRAN IV Statement of Expenditures BY COMPONENT 2 for the Reporting Period of Jan 01 to Dec 31, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301002376 4 Maret 2021 Bendahara Pengeluaran 71.729.828,59 100% 71.729.828,59 14.371 4.991,29 Barang (PHLN-COREMAP) Dari Bendahara Pengeluaran (Jakarta) 2 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301002569 5 Maret 2021 Bendahara Pengeluaran 50.399.959,26 100% 50.399.959,26 14.371 3.507,06 Perjalanan Dinas (PHLN-COREMAP) dalam rangka Melakukan kegiatan Dinamika Karbon Perairan Ekosistem Pesisir pada Pulau dengan Variabilitas Genesis dan Kondisi Lingkungan di Lombok 3 Component 2 Pembayaran Belanja Barang (PHLN-COREMAP) berupa LIPI 210881301002305 3 Maret 2021 Bendahara Pengeluaran 31.250.026,92 100% 31.250.026,92 14.371 2.174,52 pembayaran perjalanan dinas dalam rangka pelaksanaan FGD kick Off Coremap Legacy Study dan keterbacaan kuisioner asesmen potensi dampak COREMAP CTI,ke Bogor, tanggal3- 5 Maret 2021 4 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301002844 10 Maret 2021 Bendahara Pengeluaran 45.500.036,04 100% 45.500.036,04 14.418 3.155,78 perjalanan dinas (PHLN- COREMAP) dalam rangka Kegiatan Penelitian Ketahanan Wilayah Pesisir Jawa Utara terhadap Bahaya Amblesan Tanah tanggal 15 - 26 Maret 2021 di Pekalongan 5 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301002966 12 Maret 2021 Bendahara Pengeluaran 33.381.995,40 100% 33.381.995,40 14.418 2.315,30 Barang (PHLN- COREMAP-052), Dari Bendahara Pengeluaran (Jakarta) 6 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301002916 12 Maret 2021 Bendahara Pengeluaran 31.780.011,42 100% 31.780.011,42 14.418 2.204,19 Perjalanan Dinas (PHLN- COREMAP-052) dalam rangka Melakukan kegiatan Evaluasi Tingkat Penyerapan dan Pelepasan Karbon dari Budidaya Makroalga Menggunakan Pendekatan Life Cycle Assessment (LCA) 7 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301003388 18 Maret 2021 Bendahara Pengeluaran 29.649.087,00 100% 29.649.087,00 14.412 2.057,25 Barang (PHLN,COREMAP,052), dari BPP.1 (Ambon) 8 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301003775 24 Maret 2021 Bendahara Pengeluaran 24.390.048,56 100% 24.390.048,56 14.446 1.688,36 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan RISET COREMAP CTI 2021-2022, di Sumbawa, Nusa Tenggara Barat, tanggal 5 s.d. 8 April 2021 9 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004168 31 Maret 2021 Bendahara Pengeluaran 71.452.781,96 100% 71.452.781,96 14.572 4.903,43 Barang (PHLN,COREMAP,052) dari BP Pusat Jakarta 10 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004195 1-Apr-2021 27.029.945,30 100% 27.029.945,30 14.533 1.859,90 Barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20020 Tanggal 31 Maret 2021 11 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301004342 5-Apr-2021 206.681.928,37 100% 206.681.928,37 14.533 14.221,55 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan Riset Peningkatan Kapasitas COREMAP CTI LIPI tahun 2021/2022 tanggal 03 s.d. 09 April 2021 di Prov. Nusa Tenggara Barat 12 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004466 6-Apr-2021 57.366.441,03 100% 57.366.441,03 14.533 3.947,32 Barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20022 Tanggal 6 April 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 13 Component 2 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004796 9-Apr-2021 13.186.627,68 100% 13.186.627,68 14.631 901,28 Barang (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20027 Tanggal 9 April 2021 14 Component 2 Pertanggungjawaban TUP untuk pembayaran Belanja LIPI 210881701002861 13-Apr-2021 225.379.874,37 100% 225.379.874,37 14.631 15.404,27 Barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20030 Tanggal 12 April 2021 15 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002665 9-Apr-2021 40.579.956,36 100% 40.579.956,36 14.631 2.773,56 barang (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20028 Tanggal 9 April 2021 16 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002864 13-Apr-2021 120.959.597,85 100% 120.959.597,85 14.631 8.267,35 barang (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20033 Tanggal 12 April 2021 17 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002860 13-Apr-2021 185.467.237,92 100% 185.467.237,92 14.631 12.676,32 barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20035 Tanggal 12 April 2021 18 Component 2 Pertanggungjawaban TUP untuk Keperluan Belanja LIPI 210881701002956 14-Apr-2021 25.473.711,72 100% 25.473.711,72 14.633 1.740,84 Barang (PHLN,COREMAP,052) dari BPP.1 P2LD Ambon, Sesuai SPP Nomor 20036 Tanggal 14 April 2021 19 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002963 15-Apr-2021 41.448.996,81 100% 41.448.996,81 14.633 2.832,57 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20042 Tanggal 15 April 2021 20 Component 2 Pertanggungjawaban TUP untuk Keperluan Belanja LIPI 210881701002958 14-Apr-2021 43.951.971,46 100% 43.951.971,46 14.633 3.003,62 Barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20038 Tanggal 14 April 2021 21 Component 2 Penggantian Uang Persediaan untuk keperluan belanja LIPI 210881301005302 19-Apr-2021 39.364.991,64 100% 39.364.991,64 14.508 2.713,33 barang (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20043 Tanggal 16 April 2021 22 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301005590 22-Apr-2021 30.309.931,70 100% 30.309.931,70 14.549 2.083,30 perjalanan dinas (PHLN,COREMAP,052) dalam rangka mengikuti kegiatan Pengambilan data Riset Penguatan Kapasitas (RPK) COREMAP CTI tahun 2021 di kota Merauke, tanggal 26 April s.d. 2 Mei 2021 23 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301005927 27-Apr-2021 59.878.400,52 100% 59.878.400,52 14.489 4.132,68 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta Sesuai SPP Nomor 20045 Tanggal 27 April 2021 24 Component 2 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881303004783 28-Apr-2021 0426/PPK/IV/PK/KU/3/2021 CV. FAJAR LAKSANA 64.760.016,30 100% 64.760.016,30 14.510 4.463,13 Pengadaan (PHLN,COREMAP ,052) Bahan Penelitian Tanggal 22 Maret 2021 Optimasi Performa Produksi Benih Teripang Pasir Melalui Rekayasa Wadah dan Pakan Koordinator Lisa Fajar Indriana BBIL LIPI, 25 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881303004781 28-Apr-2021 081/FKH/IF/04/2021 tanggal CV. Kharisma Scientific 42.280.979,20 100% 42.280.979,20 14.510 2.913,92 Pengadaan bahan Penelitian (PHLN,COREMAP,052) 16 April 2021 Penilaian Risiko Ikan Asing Invasif di Daerah Aliran Sungai dan Estuari Studi Kasus: DAS Ciliwung dan Kawasan Konservasi Mangrove Muara Angke Koord. Rahmi Dina P2L LIPI 26 Component 2 Penggantian UP Untuk Keperluan Belanja barang LIPI 210881301006504 4-May-2021 47.286.257,52 100% 47.286.257,52 14.467 3.268,56 (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20051 Tanggal 4 Mei 2021 27 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301007248 11-May-2021 11.002.456,14 100% 11.002.456,14 14.198 774,93 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20059 Tanggal 11 Mei 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 28 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301006872 6-May-2021 28.026.568,04 100% 28.026.568,04 14.198 1.973,98 (PHLN,COREMAP,052) dari Bendahara Pengeluaran Pusat - Jakarta, Sesuai SPP Nomor 20053 Tanggal 5 Mei 2021 29 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007147 10-May-2021 68.239.989,38 100% 68.239.989,38 14.198 4.806,31 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Survei lapangan ke Kawasan Segara Anakan Cilacap tanggal 19 Mei s.d 25 Mei 2021, 30 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301006968 7-May-2021 36.487.156,24 100% 36.487.156,24 14.198 2.569,88 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20054 Tanggal 7 Mei 2021 31 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301007320 17-May-2021 82.740.002,59 100% 82.740.002,59 14.203 5.825,53 perjalanan dinas (PHLN,COREMAP,052) dalam rangka penelitian lapangan kegiatan Coral Reef Rehabilitation and Management Program-Coral Triangle Initiative Project tanggal 24 Mei s.d. 7 Juni 2021 32 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005433 17-May-2021 4.223.972,20 100% 4.223.972,20 14.203 297,40 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20062 Tanggal 17 Mei 2021 33 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005436 17-May-2021 55.859.972,91 100% 55.859.972,91 14.203 3.932,97 barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20064 Tanggal 17 Mei 2021 34 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007540 19-May-2021 207.872.951,00 100% 207.872.951,00 14.300 14.536,57 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Kegiatan Riset Pengembangan Kapasitas Coremap CTI ke Pulau Rote , Nusa Tenggara Timur sesuai dengan Surat Tugas Nomor 3415/II/TU.01.01/4/2021, 35 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005474 18-May-2021 45.545.786,00 100% 45.545.786,00 14.300 3.185,02 barang (PHLN,COREMAP,052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20067 Tanggal 17 Mei 2021 36 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301007997 27-May-2021 16.654.264,20 100% 16.654.264,20 14.310 1.163,82 (PHLN,COREMAP,052) dari BPP1.AMbon, Sesuai SPP Nomor 20071 Tanggal 25 Mei 2021 37 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301007996 27-May-2021 23.240.012,40 100% 23.240.012,40 14.310 1.624,04 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti survei kegiatan Riset Pengembangan Kapasitas Program Rehabilitasi dan Pengelolaan Terumbu Karang, Inisiatif Segitiga Karang 38 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881303006825 28-May-2021 037/AS/FK/V/2021 Tanggal 24 CV. Aneka Sarana 41.916.995,10 100% 41.916.995,10 14.310 2.929,21 berupa Pengadaaan bahan Penelitian Isolasi dan Mei Karakterisasi Mikroba Patogenik pada Sidat (Anguilla 2021 spp) Hasil Tangkapan Asal Pesisir Sungai CImandiri, Kab. Sukabumi, Jawa Barat 39 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301008902 8-Jun-2021 14.000.007,06 100% 14.000.007,06 14.262 981,63 perjalanan dinas (PHLN,COREMAP,052) dalam rangka mengikuti kegiatan Riset Pengembangan Kapasitas Program Rehabilitasi di Kabupaten Sukabumi pada tanggal 9 s.d. 13 Juni 2021 40 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301009075 9-Jun-2021 18.748.967,82 100% 18.748.967,82 14.262 1.314,61 (PHLN,COREMAP,052) dari BPP.3 Bandung, Sesuai SPP Nomor 20079 Tanggal 9 Juni 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 41 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301009425 15-Jun-2021 61.092.023,20 100% 61.092.023,20 14.222 4.295,60 perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti kegiatan Riset Pengembangan Kapasitas COREMAP-CTI Tahun Anggaran 2021, di Kabupaten Paser Kalimantan Timur, tanggal 20 s.d. 26 Juni 2021 42 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301009240 11-Jun-2021 18.450.058,38 100% 18.450.058,38 14.222 1.297,29 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka Mengikuti survei kegiatan riset pengembangan kapasitas dengan judul Eksplorasi Mikroorganisme Perairan Teluk Jakarta 43 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881303007859 11-Jun-2021 31/KW/CVGS/V/2021 tanggal CV. Gina Sejahtera 22.637.441,84 100% 22.637.441,84 14.222 1.591,72 berupa Pembayaran Pengadaan bahan pemeliharaan dan 31 Mei 2021 perlengkapan analisis untuk kegiatan penelitian makroalga sebagai pakan dan sumber antioksidan, sesuai dengan kwitansi nomor: 31/KW/CVGS/V/2021 44 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701008210 17-Jun-2021 117.634.556,83 100% 117.634.556,83 14.453 8.139,11 Barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20087 Tanggal 17 Juni 2021 45 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008267 18-Jun-2021 29.991.709,36 100% 29.991.709,36 14.453 2.075,12 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20089 Tanggal 18 Juni 2021 46 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008211 17-Jun-2021 72.613.028,24 100% 72.613.028,24 14.453 5.024,08 barang (PHLN,COREMAP, 052) dari BPP3. Bandung, Sesuai SPP Nomor 20088 Tanggal 17 Juni 2021 47 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008429 21-Jun-2021 7.512.235,81 100% 7.512.235,81 14.453 519,77 barang (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20093 Tanggal 18 Juni 2021 48 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008431 21-Jun-2021 84.826.391,36 100% 84.826.391,36 14.453 5.869,12 Barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20096 Tanggal 18 Juni 2021 49 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008432 18-Jun-2021 8.430.001,31 100% 8.430.001,31 14.453 583,27 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20097 Tanggal 18 Juni 2021 50 Component 2 Penggantian UP untuk keperluan Belanja barang LIPI 210881301010248 22-Jun-2021 16.499.978,39 100% 16.499.978,39 14.453 1.141,63 (PHLN,COREMAP,052) dari BPP.1 Ambon, Sesuai SPP Nomor 20098 Tanggal 22 Juni 2021 51 Component 2 Penggantian UP untuk keperluan Belanja barang LIPI 210881301010486 25-Jun-2021 52.020.472,32 100% 52.020.472,32 14.472 3.594,56 (PHLN,COREMAP,052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20102 Tanggal 25 Juni 2021 52 Component 2 Penggantian UP Untuk Keperluan Belanja Barang LIPI 210881301010765 01/07/2021 Bendahara Pengeluaran 18.645.000,00 100% 18.645.000,00 14.482 1.287,46 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20122 Tanggal 4 Agustus 2021 53 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701009421 02/07/2021 Bendahara Pengeluaran 65.607.544,00 100% 65.607.544,00 14.482 4.530,28 barang (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20104 Tanggal 2 Juli 2021 54 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301011484 09/07/2021 Bendahara Pengeluaran 7.690.109,00 100% 7.690.109,00 14.548 528,60 (PHLN,COREMAP,052) dari BPP.4 Mataram Sesuai SPP Nomor 20106 Tanggal 9 Juli 202 55 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301011643 13/07/2021 Bendahara Pengeluaran 52.590.000,00 100% 52.590.000,00 14.486 3.630,40 Perjalanan Dinas (PHLN,COREMAP,052) dalam rangka kegiatan Riset Pengembangan Kapasitas Coremap CTI dengan judul Evaluasi Tingkat Penyerapan dan Pelepasan Karbon dari Budidaya Makroalga 1 2 3 4 5 6 7 8 9 10 11 12 13 14 56 Component 2 Pertanggungjawaban TUP untuk Keperluan belanja LIPI 210881701010185 15/07/2021 Bendahara Pengeluaran 117.519.180,00 100% 117.519.180,00 14.493 8.108,69 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20108 Tanggal 14 Juli 2021 57 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701010385 19/07/2021 Bendahara Pengeluaran 47.152.600,00 100% 47.152.600,00 14.524 3.246,53 Barang (PHLN,COREMAP, 052) dari BPP.3 Bandung, Sesuai SPP Nomor 20109 Tanggal 16 Juli 2021 58 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010848 27/07/2021 Bendahara Pengeluaran 89.667.990,00 100% 89.667.990,00 14.494 6.186,57 barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong, Sesuai SPP Nomor 20112 Tanggal 26 Juli 2021 59 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701011067 29/07/2021 Bendahara Pengeluaran 32.836.434,00 100% 32.836.434,00 14.498 2.264,89 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung, Sesuai SPP Nomor 20117 Tanggal 28 Juli 2021 60 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010935 28/07/2021 Bendahara Pengeluaran 32.499.600,00 100% 32.499.600,00 14.498 2.241,66 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20115 Tanggal 27 Juli 2021 61 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010929 28/07/2021 Bendahara Pengeluaran 222.719.580,00 100% 222.719.580,00 14.498 15.362,08 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20113 Tanggal 26 Juli 2021 62 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701011068 29/07/2021 Bendahara Pengeluaran 71.643.655,00 100% 71.643.655,00 14.498 4.941,62 barang (PHLN,COREMAP, 052) dari BPP.5 P2O jakarta, Sesuai SPP Nomor 20118 Tanggal 28 Juli 2021 63 Component 2 Penggantian UP Untuk Keperluan Belanja Barang LIPI 210881301013166 05/08/2021 Bendahara Pengeluaran 13.515.600,00 100% 13.515.600,00 14.342 942,38 (PHLN,COREMAP,052) dari BPP.4 Mataram, Sesuai SPP Nomor 20122 Tanggal 4 Agustus 2021 64 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881303010910 05/08/2021 Kuitansi Nomor: 063/KW- PT FIRST MEDIA NEWS 49.900.000,00 100% 49.900.000,00 14.342 3.479,29 berupa Pembayaran Pengadaan Jasa Media Campaign KL/VII/2021 tanggal 30 Juli Talk Show Untuk Kegiatan Diseminasi Coremap CTI, 2021 sesuai Kuitansi Nomor: 063/KW-KL/VII/2021 tanggal 30 Juli 2021 65 Component 2 Pembayaran Belanja Barang LIPI 210881303010924 05/08/2021 0921/PPK/IV/PK/KU/4/2 021 CV. SUBUR KARYA 116.321.000,00 100% 116.321.000,00 14.342 8.110,51 (PHLN,COREMAP,052)berupa Pembayaran Pengadaan tanggal 29 April 2021 Bahan Penelitian Pemetaan Distribusi dan Kelimpahan sidat (Anguilla spp.) dengan teknologi eDNA sebagai dasar konservasi sidat di kawasan segara anakan Cilacap 66 Component 2 Penggantian UP Untuk Keperluan Belanja Barang LIPI 210881301013982 16/08/2021 Bendahara Pengeluaran 15.796.007,00 100% 15.796.007,00 14.383 1.098,24 (PHLN,COREMAP,052) dari BPP.1 Ambon, Sesuai SPP Nomor 20124 Tanggal 13 Agustus 2021 67 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301014282 19/08/2021 Bendahara Pengeluaran 23.400.000,00 100% 23.400.000,00 14.415 1.623,31 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan riset pengembangan kapasi tas COREMAP CTI dengan Judul Karakterisasi Sedimen Organik Perairan Rentan Hypoxia di Teluk Semarang 68 Component 2 Pertanggungjawaban TUP untuk keperluan Belanja LIPI 210881701012796 26/08/2021 Bendahara Pengeluaran 36.402.000,00 100% 36.402.000,00 14.408 2.526,51 Barang (PHLN,COREMAP, 052) dari BPP.4 Mataram, Sesuai SPP Nomor 20132 Tanggal 25 Agustus 2021 69 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701012795 26/08/2021 Bendahara Pengeluaran 13.200.000,00 100% 13.200.000,00 14.408 916,16 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram, Sesuai SPP Nomor 20131 Tanggal 25 Agustus 2021 70 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013076 30/08/2021 Bendahara Pengeluaran 195.381.300,00 100% 195.381.300,00 14.374 13.592,69 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta, Sesuai SPP Nomor 20137 Tanggal 30 Agustus 2021 71 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013074 30/08/2021 Bendahara Pengeluaran 45.658.364,00 100% 45.658.364,00 14.374 3.176,45 barang (PHLN,COREMAP. 052) dari BP Pusat Jakarta, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 72 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301015049 31/08/2021 Bendahara Pengeluaran 12.020.000,00 100% 12.020.000,00 14.374 836,23 (PHLN,COREMAP,052), dari BPP.4 Mataram 73 Component 2 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301015554 06/09/2021 Bendahara Pengeluaran 45.500.000,00 100% 45.500.000,00 14.261 3.190,52 perjalanan dinas (PHLN, COREMAP,052) dalam rangka kegiatan penelitian Ketahan Wilayah Pesisir Jawa Utara terhadap Ambiens Tanah di Kota Pekalongan, tanggal 14- 25 September 2021 74 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301015404 03/09/2021 Bendahara Pengeluaran 20.879.800,00 100% 20.879.800,00 14.261 1.464,12 (PHLN,COREMAP,052) dari BPP.1 Ambon 75 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013974 10/09/2021 Bendahara Pengeluaran 222.358.754,00 100% 222.358.754,00 14.272 15.580,07 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 76 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301015705 08/09/2021 Bendahara Pengeluaran 55.140.000,00 100% 55.140.000,00 14.272 3.863,51 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Melakukan penelitian lapangan ke Kabupaten Cirebon tanggal 14 s.d. 26 September 2021 77 Component 2 Pembayaran Belanja barang berupa pembayaran LIPI 210881301015866 10/09/2021 Bendahara Pengeluaran 109.185.000,00 100% 109.185.000,00 14.272 7.650,29 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Mengikuti Prasurvei dan Survei kegiatan Riset Unggulan COREMAP CTI di Kota Manado, Provinsi Sulawesi Utara, tanggal 13 s.d.23 September 2021 78 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301015756 08/09/2021 Bendahara Pengeluaran 40.392.000,00 100% 40.392.000,00 14.272 2.830,16 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan Riset Pengembangan Kapasi tas COREMAP CTI di Teluk Wediombo Gunung Kidul, Provinsi DI Yogyakarta 79 Component 2 enggantian UP untuk keperluan belanja barang LIPI 210881301015669 08/09/2021 Bendahara Pengeluaran 10.430.000,00 100% 10.430.000,00 14.272 730,80 (PHLN,COREMAP,052) dari BPP.4 Mataram, 80 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301017045 24-Sep-2021 Bendahara Pengeluaran 8.535.226,00 100% 8.535.226,00 14.155 602,98 (PHLN,COREMAP, 052) dari BPP.4 Mataram 81 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302013618 29-Sep-2021 No 30/CV-SJM/K/IX/2021 CV. SABET JAYA MANDIRI 47.951.000,00 100% 47.951.000,00 14.155 3.387,57 berupa Pembayaran Pengadaan Bahan pelatihan CTI tanggal 24 September 2021 Pemantauan Komunitas Mangrove dan Lamun TUK UMRAH, sesuai Kwitansi No 30/CV-SJM/K/IX/2021 tanggal 24 September 2021 82 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016138 14-Sep-2021 Bendahara Pengeluaran 51.510.000,00 100% 51.510.000,00 14.155 3.639,00 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan pengambilan data penelitian riset unnggulan tahun 2021 tanggal 16 s.d. 22 September 2021 di Kabupaten Lombok Tengah NTB 83 Component 2 Pembayaran Belanja Barang Berupa Pembayaran LIPI 210881301016830 22-Sep-2021 Bendahara Pengeluaran 466.007.130,00 100% 466.007.130,00 14.096 33.059,53 perjalanan dinas (PHLN, COREMAP,052) dalam rangka mengikuti kegiatan RHM COREMAP di Kalimantan Timur (Susi Rahmawati) 84 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016818 21-Sep-2021 Bendahara Pengeluaran 448.196.000,00 100% 448.196.000,00 14.096 31.795,97 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Menghadiri koordinasi dan pelaksanaan Pelati han Penilai Kondisi Terumbu Karng Biodiversitas Ikan Karang di Universitas Udayana Bali 85 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302013609 29-Sep-2021 K038PB092021, tanggal 9 CV. PASUNDAN BIOTECH 31.693.000,00 100% 31.693.000,00 14.165 2.237,420 berupa Pembayaran Pengadaan bahan kimia (indent) September 2021 Kegiatan Kultivasi Mikroalga Berprotein tinggi spirulina maxima menggunakan media limbah organik 86 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301016784 21-Sep-2021 Bendahara Pengeluaran 6.445.800,00 100% 6.445.800,00 14.165 455,05 (PHLN,COREMAP,052) dari BP Pusat Jakarta 1 2 3 4 5 6 7 8 9 10 11 12 13 14 87 Component 2 Pembayaran belanja barang berupa pembayaran LIPI 210881301018239 8-Oct-2021 Bendahara Pengeluaran 29.700.000,00 100% 29.700.000,00 14.165 2.096,72 perjalanan dinas (PHLN, COREMAP,052) dalam rangka melakukan penelitian dan pengujian sampel di laboratorium penelitian dan pengujian terpadu UGM, 88 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017300 28-Sep-2021 Bendahara Pengeluaran 89.190.000,00 100% 89.190.000,00 14.165 6.296,51 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka survey dinamika Sedimentasi Muara Batanghari dan Dampaknya Terhadap Ekosistem Pesisir di Jambi (Iwan.R) 89 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015798 4-Oct-2021 Bendahara Pengeluaran 76.602.833,00 76.602.833,00 14.165 5.407,90 barang (PHLN,COREMAP, 052,053) dari BPP.1 Ambon 90 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301018367 11-Oct-2021 Bendahara Pengeluaran 19.385.169,00 19.385.169,00 14.165 1.368,53 (PHLN,COREMAP,052) Cofunding, dari BPP.4 Mataram, 91 Component 2 Pembayaran belanja barang berupa pembayaran LIPI 210881301018125 7-Oct-2021 Bendahara Pengeluaran 94.824.000,00 94.824.000,00 14.165 6.694,25 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Melaksanakan kegiatan Pelatihan Pemantau Ekosistem Mangrove di Universitas Trunodjoyo Madura tanggal 16 s.d. 24 Oktober 2021 92 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881303017314 26-Oct-2021 2054/PPK/IV/PK/KU/8/2021 CV. Aneka Sarana 96.617.000,00 100% 96.617.000,00 14.165 6.820,83 berupa Pengadaan Bahan Kegiatan Pencemaran tanggal 12 Agustus 2021 Mikroplastik Perairan Danau Urban Jakarta dan Sekitarnya yang bermuara di teluk Jakarta Koordinator Tri Suryono P2L 93 Component 2 Pembayaran Belanja Barang Berupa pembayaran LIPI 210881301017339 29-Sep-2021 Bendahara Pengeluaran 23.375.000,00 100% 23.375.000,00 14.165 1.650,19 perjalanan dinas (PHLN, COREMAP,052) dalam rangka Survei Lapangan ke Kabupaten Lebak, Banten tanggal 28 September s.d 03 Oktober 2021 94 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881303015468 5-Oct-2021 028/KW/IX/21 tanggal 28 CV General Labora 14.761.100,00 100% 14.761.100,00 14.165 1.042,08 berupa Pembayaran Pengadaan Bahan Kimia (Indent) September 2021 kegiatan Potensi Alginat dari Mikroalga Laut sebagai Bahan Baku Nanoenkapsulan (Cofunding MALSAI) sesuai kwitansi No 028/KW/IX/21 tanggal 28 September 2021 95 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co LIPI 210881303013972 15-Sep-2021 195/KW-MHM/IX/2021 CV.MARGANA HITA MANDIRI 28.040.000,00 100% 28.040.000,00 14.165 1.979,53 funding berupa Pembayaran Pengadaaan bahan Kimia tanggal 9 September 2021 Kegiatan Teknologi Fotobioreaktor untuk Mikroalga sebagai wahana Biomass Generator dan CO2, 96 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301018669 13-Oct-2021 Bendahara Pengeluaran 187.041.000,00 100% 187.041.000,00 14.165 13.204,45 berupa Perjalanan Dinas dalam rangka Melaksanakan kegiatan lapangan Studi Perubahan Spasial dan Temporal Tutupan Mangrove di Laguna Segara Anakan, Cilacap, Jawa Tengah 97 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301018625 13-Oct-2021 Bendahara Pengeluaran 10.670.000,00 100% 10.670.000,00 14.165 753,27 Perjalanan Dinas(PHLN, COREMAP,052) dalam rangka melakukan analisis sampel hasil penelitian di BATAN Jakarta tanggal 18 s.d. 19 Oktober 2021, 98 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016137 14-Sep-2021 Bendahara Pengeluaran 45.372.000,00 100% 45.372.000,00 14.165 3.203,11 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Mengikuti kegiatan Studi Budidaya dan Pengem bangan Teknik Reproduksi Aseksual Pada Karang Hias tanggal 13 s.d. 17 September 2021 di Banyuwangi 1 2 3 4 5 6 7 8 9 10 11 12 13 14 99 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co LIPI 210881303014098 16-Sep-2021 112/CKP/K/IX/2021 tanggal 10 CV. CIPTA KARYA PERDANA 43.431.000,00 100% 43.431.000,00 14.165 3.066,08 Funding, berupa Pembayaran Pengadaaan bahan Kimia September 2021 Kegiatan Teknologi Fotobioreaktor untuk Mikroalga sebagai wahana Biomass Generator dan CO2 100 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015361 29-Sep-2021 Bendahara Pengeluaran 40.090.000,00 100% 40.090.000,00 14.165 2.830,22 barang (PHLN,COREMAP. 052) dari BP Pusat Jakarta 101 Component 2 Pertanggungjawaban TUP untuk Keprluan Belanja Barang LIPI 210881701015316 29-Sep-2021 Bendahara Pengeluaran 100.220.857,00 100% 100.220.857,00 14.165 7.075,25 (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta, 102 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302013574 28-Sep-2021 2681/PPK/IV/PK/KU/IX/9/2021 PT KEMIKO SAVITRI SEJAHTERA 82.410.000,00 100% 82.410.000,00 14.165 5.817,86 berupa pembayaran Pengadaan Paket Meeting dalam tanggal 13 September 2021 rangka WOrkshop Revisi Program dan Perencanaan kegiatan Coremap CTI Tahun 2021 103 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) Co LIPI 210881303013976 15-Sep-2021 025/INV/PT.MED/09/2021 PT MEDRAY 47.541.000,00 100% 47.541.000,00 14.165 3.356,23 Funding, berupa Pembayaran Pengadaan Glass Wares tanggal 07 September 2021 dan Perlengkapan Laboratorium dalam rangka kegiatan pengembangan desain fotobioreaktor untuk produksi biomassa mikroalga anthospira (Spirulina) 104 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301018628 13-Oct-2021 Bendahara Pengeluaran 51.676.000,00 100% 51.676.000,00 14.165 3.648,15 berupa Perjalanan dinas dalam rangka Mengikuti Kegiatan Asesmen Simpul Data Pemantauan Ekosist em Pesisir di Pekanbaru (Bayu P), dan Pengambilan data lapangan untuk Penelitian Model transportasi 105 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301018626 13-Oct-2021 Bendahara Pengeluaran 22.842.700,00 100% 22.842.700,00 14.165 1.612,62 (PHLN,COREMAP,052) dari BPP.1 Ambon 106 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301016764 21-Sep-2021 Bendahara Pengeluaran 32.148.000,00 100% 32.148.000,00 14.165 2.269,54 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Survei Lapangan ke Kawasan Segara Anakan Cilacap (Sekar Larashati) dan Survei dan Pengukuran Lapangan Kuantitas Kualitas Perairan di DAS di Konawe 107 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015596 30-Sep-2021 Bendahara Pengeluaran 50.141.911,00 100% 50.141.911,00 14.165 3.539,85 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 108 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015539 30-Sep-2021 Bendahara Pengeluaran 99.855.000,00 100% 99.855.000,00 14.165 7.049,42 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 109 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881301019131 18-Oct-2021 Bendahara Pengeluaran 228.638.000,00 100% 228.638.000,00 14.165 16.141,05 berupa perjalanan dinas dalam rangka Pengambilan Sampel air,sedimen dan ikan di Teluk banten (Sugiarti), dan survei lapangan di kab. Garut-JABAR (Asep sandra) dan di Kab. Banggai-SULTENG 110 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015315 29-Sep-2021 Bendahara Pengeluaran 77.007.127,00 100% 77.007.127,00 14.165 5.436,44 Barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong 111 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302014936 18-Oct-2021 2887/PPK/IV/PK/KU/9/2021 CV Inovasi Multi Kreasi 101.175.000,00 100% 101.175.000,00 14.165 7.142,61 berupa Pengadaan Bahan Pelatihan CTI Pemantauan Ikan tanggal 29 September 2021 Karang, Terumbu Karang dan Megabenthos TUK UBH sesuai SPK No: 2887/PPK/IV/PK/KU/9/2021 tanggal 29 September 2021 112 Component 2 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017071 24-Sep-2021 Bendahara Pengeluaran 193.853.000,00 100% 193.853.000,00 14.165 13.685,35 Perjalanan Dinas (PHLN, COREMAP,052) dalam rangka Validasi dan Indepth Interview Palaku Kunci COREMAP CTI (Aan Johan), Survei dan Pengukuran Lapangan Kuantitas dan dan Kualitas Perairan di DAS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 113 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302013418 24-Sep-2021 61/KPF/K/IX/2021 tanggal 22 CV. KING PREMIER FAMILY 18.968.000,00 100% 18.968.000,00 14.165 1.339,08 berupa Pengadaan Bahan Workshop sinkronisasi dan September 2021 Pemutakhiran data pemantauan terumbu karang dan ekosistem terkait lainnya 114 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701014369 15-Sep-2021 Bendahara Pengeluaran 11.947.700,00 100% 11.947.700,00 14.165 843,47 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 115 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301016491 17-Sep-2021 Bendahara Pengeluaran 27.007.250,00 100% 27.007.250,00 14.165 1.906,62 (PHLN,COREMAP,052) dari BPP.3 Bandung, 116 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301018089 7-Oct-2021 Bendahara Pengeluaran 19.062.221,00 100% 19.062.221,00 14.165 1.345,73 (PHLN,COREMAP,052) COfunding, dari BPP.4 Mataram 117 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302015447 26-Oct-2021 75/KPF/K/10/2021 tanggal 22 CV. King Premier Family 46.953.000,00 100% 46.953.000,00 14.165 3.314,72 berupa pengadaan bahan training internasional Oktober 2021, Mangrove Monitoring RTRC MarBEST 2021 Koordinator I Wayan EKa Dharmawan LIPI 118 Component 2 Pembayaran Belanja Barang (PHN,COREMAP,052) berupa LIPI 210881303017319 26-Oct-2021 1971/PPK/IV/PK/KU/7/2021 PT Mitra Utama Varia 91.015.000,00 100% 91.015.000,00 14.165 6.425,34 Pengadaan bahan Penelitian Rekayasa Energi Gelombang tanggal 22 Juli 2021 dan Iklim Mikro Wilayah Pesisir dalam Meningkatkan Produktifitas Kultur Mikroalga Arthospira platensis Koordinator Dr. Nofdianto P2L LIPI 119 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301019526 22-Oct-2021 Bendahara Pengeluaran 130.417.800,00 100% 130.417.800,00 14.165 9.207,05 berupa perjalanan dinas dalam rangka menghadiri kordinasi dan pelaksanaan pelatihan penilaian kondisi padang lamun di Bali (Niken), dan melakukan survey RPK COREMAP CTI di Pulau Bintan 120 Component 2 Pembayaran Belanja Barang berupa pembayaran LIPI 210881301016136 14-Sep-2021 Bendahara Pengeluaran 216.750.000,00 100% 216.750.000,00 14.165 15.301,80 perjalanan dinas (PHLN, COREMAP,052) dalam rangka mengikuti Workshop Revisi Program Kegiatan Coremap CTI 2021, di Semarang tanggal 12 s.d. 16 September 2021, 121 Component 2 Penggantian Uang persediaan untuk keperluan belanja LIPI 210881301017446 30-Sep-2021 Bendahara Pengeluaran 6.600.000,00 100% 6.600.000,00 14.165 465,94 barang (PHLN, COREMAP,052) dari BPP.4 Mataram 122 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881303014383 21-Sep-2021 060-KW/TCJ/IX/2021 tanggal PT. TRIASIH CIPTA JAYA 32.100.000,00 100% 32.100.000,00 14.165 2.266,15 berupa pembayaran pengadaan seminar kit workshop 13 September 2021 revisi program dan perencanaan kegiatan COREMAP CTI Tahun 2021, sesuai kwitansi nomor 060-KW/TCJ/IX/2021 tanggal 13 September 2021 123 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301020139 29-Oct-2021 Bendahara Pengeluaran 579.064.000 100% 579.064.000 14.261 40.604,73 berupa Perjalanan dinas dalam rangka kegiatan Pelatihan Penilaian Kondisi Padang Lamun di UNRAM Lombok NTB (Milani), Kegiatan RHM di Kepulauan Seribu (Rikoh), Reef Health Monitoring di Lampung 124 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301020438 03-Nov-21 Bendahara Pengeluaran 46.130.455,00 100% 46.130.455 14.261 3.234,73 (PHLN,COREMAP,052) dari BPP.3 Bandung 125 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302015810 01-Nov-21 8321/K/AR/X/2021 tanggal 26 CV. Anugrah Raya 26.118.000,00 100% 26.118.000 14.261 1.831,43 berupa pengadaan bahan penelitian studi Oktober 2021 keanekaragaman genetik ikan capungan banggai (Pterapo gon kauderni) di Indonesia Koordinator Ucu Yanu Arbi, sesuai kwitansi nomor 8321/K/AR/X/2021 126 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301020096 28 Oktober 2021 Bendahara Pengeluaran 37.886.812,00 100% 37.886.812 14.261 2.656,67 (PHLN,COREMAP,052) dari BPP.2 Cibinong 1 2 3 4 5 6 7 8 9 10 11 12 13 14 127 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302016432 08-Nov-21 KW-34.11.0021 tanggal 4 PT. Arena Multi Media 42.940.000 100% 42.940.000 14.268 3.009,53 berupa paket pengadaan jasa publikasi media online dan November 2021 sosial media kegiatan MonMang COREMAP CTI, Koordinator Dyah R Sugianto BKHH LIPI, sesuai dengan Kwitansi Nomor KW-34.11.0021 tanggal 4 November 2021 128 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881301021289 10-Nov-21 Bendahara Pengeluaran 125.442.000 100% 125.442.000 14.253 8.801,09 berupa perjalanan dinas kegiatan Konsinyering Pengembangan Model AI untuk Analisa Data Foto Terumbu Karang di Malang (Bambang H) dan Biologi Status Populasi dan Pemanfaatan Hiu Terancam di Mataram 129 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881302016742 11-Nov-21 76/IGP/K/XI/2021 tanggal 5 CV. Indo Graha Persada 44.146.000,00 100% 44.146.000 14.253 3.097,31 berupa pengadaan Bahan Pelatihan Penilaian Terumbu November 2021 karang dan ekosistem terkait lainnya di Universitas Mataram NTB koordinator Milani Anggiani, sesuai dengan Kwitansi Nomor 76/IGP/K/XI/2021 130 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701019622 11-Nov-21 Bendahara Pengeluaran 12.550.000,00 100% 12.550.000 14.253 880,52 barang (PHLN,COREMAP, 052) Cofunding, dari BPP.4 Mataram 131 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301021302 11-Nov-21 Bendahara Pengeluaran 6.600.000,00 100% 6.600.000 14.253 463,06 (PHLN,COREMAP,052) dari BPP.4 Mataram 132 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301021630 15-Nov-21 Bendahara Pengeluaran 61.045.600 100% 61.045.600 14.243 4.286,01 (PHLN,COREMAP,052) dari BP Pusat Jakarta, 133 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303019448 17-Nov-21 1364/PPK/IV/PK/KU/6/2021 PT. Genecraft Lab 129.000.000 100% 129.000.000 14.211 9.077,48 berupa pembayaran Pengadaan Jasa Kalibrasi dan Tanggal 2 Juni 2021 Penggantian Sparepart Peralatan Laboratorium Puslit Oseanografi berupa alat GCMS sesuai dengan SPK Nomor: 1364/PPK/IV/PK/KU/6/2021 Tanggal 2 Juni 2021 134 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701020454 16-Nov-21 Bendahara Pengeluaran 9.002.000 100% 9.002.000 14.211 633,45 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 135 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301021755 15-Nov-21 Bendahara Pengeluaran 6.796.100,00 100% 6.796.100 14.211 478,23 (PHLN,COREMAP,052) dari BPP.4 Mataram 136 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301022239 22-Nov-21 Bendahara Pengeluaran 78.730.000,00 100% 78.730.000 14.255 5.522,97 (PHL,COREMAP,052) dari BP Pusat Jakarta, 137 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021962 29-Nov-21 Bendahara Pengeluaran 110.074.047 100% 110.074.047 14.280 7.708,27 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 138 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021965 29-Nov-21 Bendahara Pengeluaran 147.434.807 100% 147.434.807 14.280 10.324,57 barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 139 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301023059 29-Nov-21 Bendahara Pengeluaran 49.805.225 100% 49.805.225 14.340 3.473,17 (PHLN,COREMAP,052) dari BPP.3 Bandung 140 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881301023065 29-Nov-21 Bendahara Pengeluaran 36.200.000,00 100% 36.200.000 14.340 2.524,41 berupa pembayaran Honorarium pengajar dan asisten pengajar pelatihan penilaian kondisi padang lamun dan mangrove di Universitas Udayana Bali 141 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021966 29-Nov-21 Bendahara Pengeluaran 78.115.013,00 100% 78.115.013 14.340 5.447,35 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 142 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021968 29-Nov-21 Bendahara Pengeluaran 47.042.000,00 100% 47.042.000 14.340 3.280,47 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 143 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021964 29-Nov-21 Bendahara Pengeluaran 3.650.000,00 100% 3.650.000 14.340 254,53 barang (PHLN,COREMAP, 052) dari BPP.4 Mataram 1 2 3 4 5 6 7 8 9 10 11 12 13 14 144 Component 2 Penggantian UP untuk Keperluan Belanja Barang LIPI 210881301023182 30-Nov-21 Bendahara Pengeluaran 18.210.000,00 100% 18.210.000 14.340 1.269,87 (PHLN,COREMAP,052) dari BPP.1 Ambon 145 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301023183 30-Nov-21 Bendahara Pengeluaran 49.610.300,00 100% 49.610.300 14.340 3.459,57 (PHLN,COREMAP,052) dari BPP2 Cibinong`` 146 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301023060 29-Nov-21 Bendahara Pengeluaran 59.900.000,00 100% 59.900.000 14.340 4.177,13 (PHLN,COREMAP,052) dari BPP.5 Jakarta 147 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301022841 26-Nov-21 056/KW-BaCls/XI/2021 tanggal CV. BACLS 7.304.545,00 100% 7.304.545 14.340 509,38 cofunding berupa pembelian Fucoidan, Fucoxanthin dan 10 November 2021 EPA Nitrosamine Mix, sesuai dengan Kwitansi Nomor 056/KW-BaCls/XI/2021 tanggal 10 November 2021 148 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881301023662 2-Dec-2021 Bendahara Pengeluaran 102.984.423,00 100% 102.984.423,00 14.348 7.177,62 berupa perjalanan dinas dalam rangka kegiatan pelatihan penilai kondisi komunitas mangrove dan padang lamun di universitas pattimura Ambon, tanggal 23 s.d. 30 November 2021 149 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301024279 7-Dec-2021 Bendahara Pengeluaran 13.231.600,00 100% 13.231.600,00 14.348 922,19 (PHLN,COREMAP,052) dri BPP.2 Cibinong 150 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301023885 3-Dec-2021 Bendahara Pengeluaran 31.799.000,00 100% 31.799.000,00 14.348 2.216,27 (PHLN,COREMAO,052) dari BPP2 Cibinong 151 Component 2 PErtanggungjawaban TUP untuk keperluan belanja LIPI 210881701022651 2-Dec-2021 Bendahara Pengeluaran 184.666.930,00 100% 184.666.930,00 14.348 12.870,57 barang (PHLN,COREMAP,05 2) dari BPP2 cibinong 152 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701022429 1-Dec-2021 Bendahara Pengeluaran 78.661.420,00 100% 78.661.420,00 14.348 5.482,40 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta 153 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881301023874 3-Dec-2021 Bendahara Pengeluaran 58.526.100,00 100% 58.526.100,00 14.348 4.079,04 berupa perjalanan dinas kegiatan Focus Group Discussion (FGD) dan Konsinyering Pembahasan Dokumen Kajian COREMAP Legacy Study di Bandung Jawa Barat 154 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301024303 7-Dec-2021 Bendahara Pengeluaran 37.460.700,00 100% 37.460.700,00 14.348 2.610,87 (PHLN,COREMAP,052) dari BP Pusat Jakarta 155 Component 2 pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302019487 13-Dec-2021 Kwitansi nomor CV. Putra Harapan Jaya 29.056.000,00 100% 29.056.000,00 14.378 2.020,87 berupa pengadaan bahan un tuk kegiatan sertifikasi 139/KW/PHJ/XII/2021 tanggal kompetensi skema penilai kondisi mangrove di TUK 3 Desember 2021 Universitas Hasanuddin Makasar 156 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881301024796 13-Dec-2021 2997/PPK/IV/PK/KU/10 CV. Dwi Srikandi 141.545.000,00 100% 141.545.000,00 14.378 9.844,55 berupa pengadaan Bahan kimia indent pemafaatan kulit ikan tuna sebagai sumber kolagen untuk pengembangan nutrasetikal anti inflamasi bagi penderita covid 19 157 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302019488 13-Dec-2021 kwitansi nomor PT. Elo Karsa Utama 36.533.000,00 100% 36.533.000,00 14.378 2.540,90 berupa pengadaan bahan penelitian makroalgae sebagai KWT/2122776/12/2021 pakan dan sumber antioksidan (Koodinator Idham tanggal 3 Desember 2021 Sumarto Pratama BBIL), 158 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023571 13-Dec-2021 Bendahara Pengeluaran 2.223.788,00 100% 2.223.788,00 14.378 154,67 barang (PHLN,COREMAP, 052) dari BPP4 Mataram 159 Component 2 Pertannggungjawaban TUP untuk keperluan belanja LIPI 210881701023570 13-Dec-2021 Bendahara Pengeluaran 15.262.500,00 100% 15.262.500,00 14.378 1.061,52 barang (PHLN,COREMAP, 052) Cofunding dari BPP4 Mataram 160 Component 2 Pembayaran belanja barang (PHLN, COREMAP,052) LIPI 210881303022462 13-Dec-2021 3858/PPK/IV/PK/KU/11/2021 PT. Trans News Corpora 100.000.000,00 100% 100.000.000,00 14.378 6.955,07 berupa pengadaan jasa diseminasi informasi kegiatan Tanggal 16 Nopember 2021 COREMAP-CTI melalui program Techt talk, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 161 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303022576 13-Dec-2021 kwitansi nomor CV. Asking Prima Kencana 19.605.000,00 100% 19.605.000,00 14.378 1.363,54 berupa pengadaan bahan untuk kegiatan kajian legasi 057/K/CV.APK/XI/2021 tanggal Coremap CTI konsinyering analisa akhir tahun 26 November 2021. 162 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302019520 13-Dec-2021 kwitansi nomor K051PB122021 CV. Pasundan Biotech 13.150.000,00 100% 13.150.000,00 14.378 914,59 berupa pengadaan bahan Penelitian pengembagan tanggal 1 Desember 2021 mikroba Asosiasi spons sebagai biokatalis untuk mendukung teknologi farmasi, 163 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303022553 13-Dec-2021 SP nomor : SUA MST PRENEUR 49.500.000,00 100% 49.500.000,00 14.378 3.442,76 berupa pekerjaan pengadaan jasa lainnya kerjasama 3343/PPK/IV/PK/KU/10/2021 pemetaan dan pelatihan Drone Deputi ilmu pengetahuan tanggal 19 Oktober 2021 kebumian BRIN 164 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303022577 13-Dec-2021 Kwitansi nomor KW254495-NR PT. Genetika Science Indonesia 10.270.000,00 100% 10.270.000,00 14.378 714,29 berupa pengadaan bahan penelitian bioassesment tanggal 24 November 2021 terhadap pencemaran logan berat Pb dan Cd pada sedimen dan air di teluk jakarta 165 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303022465 13-Dec-2021 Invoice nomor PT. Radio Trijaya Shakti 40.000.000,00 100% 40.000.000,00 14.378 2.782,03 berupa pengadaan jasa media campaign Bumi Kita untuk TRJK/2111/K014 tanggal 6 kegiatan Diseminasi Coremap CTI (Koord Dyah R Desember 2021 Sugianto) 166 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881302019526 13-Dec-2021 kwitansi nomor CV. Central Cakra Buana 30.016.000 100% 30.016.000,00 14.378 2.087,63 berupa pengadaan bahan pe latihan pemantau penilai 55/K/CV.CCB/11/2021 Tanggal komunitas mangrove dan padang lamun di Universitas 23 November 2021 pattimura 167 Component 2 Pembayaran Belanja Barang (PHLN,COREMAP,052) LIPI 210881302019528 13-Dec-2021 Invoice No INV/124/XI/2021 CV. Endamora Maju bersama 42.500.000,00 100% 42.500.000,00 14.378 2.955,90 berupa pengadaan jasa diseminasi informasi kegiatan tanggal 30 November 2021 coremap CTI melalui program pemberitaan LKBN Antara 168 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023687 14-Dec-2021 Bendahara Pengeluaran 316.355.172 100% 316.355.172,00 14.348 22.048,73 barang (PHLN,COREMAP, 052) dari BPP.5 P2O jakarta 169 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023691 14-Dec-2021 Bendahara Pengeluaran 703.830.082 100% 703.830.082,00 14.348 49.054,23 barang (PHLN,COREMAP, 170 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023689 14-Dec-2021 Bendahara Pengeluaran 157.974.098 100% 157.974.098,00 14.348 11.010,18 barang (PHLN,COREMAP, 052) dari BPP.5 P2) Jakarta 171 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023696 14-Dec-2021 Bendahara Pengeluaran 1.700.000 100% 1.700.000,00 14.348 118,48 barang (PHLN,SOREMAP, 052) Cofundin 172 Component 2 pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023690 14-Dec-2021 Bendahara Pengeluaran 138.259.061 100% 138.259.061,00 14.348 9.636,12 barang (PHLN,COREMAP, 052) dari BPP.1 Ambon 173 Component 2 Pertanggungjawaban TUP untuk keprluan belanja barang LIPI 210881701023695 14-Dec-2021 Bendahara Pengeluaran 151.292.132 100% 151.292.132,00 14.348 10.544,48 (PHLN,COREMAP, 052) dari BPP.3 Bandung 174 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023688 14-Dec-2021 Bendahara Pengeluaran 38.790.000 100% 38.790.000,00 14.348 2.703,51 barang (PHLN,COREMAP, 052) Cofunding Dari BP Pusat Jakarta 175 Component 2 Pembayaran belanja modal (PHLN,COREMAP,052) LIPI 210881303023458 16-Dec-2021 Kwitansi Nomor 100- PT. TRIASIH CIPTA JAYA 23.000.000 100% 23.000.000,00 14.343 1.603,57 berupa pengadaan scanner dan infokus portable KW/TCJ/XII/2021 tanggal 16 Desember 2021 176 Component 2 Pembayaran Belanja barang (PHLN,COREMAP,052) LIPI 210881301025250 16-Dec-2021 Bendahara Pengeluaran 84.056.000 100% 84.056.000,00 14.343 5.860,42 berupa perjalanan dinas Survei dan Pengukuran Lapangan Kuantitas & Kualitas Perairan di DAS & pesisir konawe sulawesi tenggara (apip) dan Jogjakarta (Tri H) 177 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881303024296 27-Dec-2021 3468/PPK/IV/PK/KU/10/2021 CV. Cipta Karya Perdana 126.815.000 100% 126.815.000 14.225 8.914,94 berupa pengadaan bahan penelitiam bioassesment Tanggal 27 Oktober 2021 terhadap pencemaran logam berat Pb dan Cd pada sedimen dan air di teluk jakarta, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 178 Component 2 Pembayaran belanja barang (PHLN,COREMAP,052) LIPI 210881301025608 27-Dec-2021 1991/PPK/IV/PK/KU/7/2021 CV. Moealim Noer 110.518.000 100% 110.518.000 14.225 7.769,28 berupa pengadaan bahan penelitian analisis risiko Tanggal 30 Juli 2021 ekologi merkuri pada penambang emas skala kecil terhadap ekosistem pesisir 179 Component 2 Penggantiap UP untuk keperluan belanja barang LIPI 210881701027365 28-Dec-2021 Bendahara Pengeluaran 49.978.000 100% 49.978.000,00 14.237 3.510,43 (PHLN,COREMAP,052) dari BPP.2 Cibinong, 180 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027366 28-Dec-2021 Bendahara Pengeluaran 18.660.000 100% 18.660.000,00 14.237 1.310,67 (PHLN,COREMAP,052) cofunding dari BPP.4 Mataram 181 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027427 28-Dec-2021 Bendahara Pengeluaran 42.153.500 100% 42.153.500,00 14.237 2.960,84 (PHLN,COREMAP,052) dari BPP.5 P2O Jakarta 182 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027428 28-Dec-2021 Bendahara Pengeluaran 49.932.000 100% 49.932.000,00 14.237 3.507,20 (PHLN,COREMAP,052) dari BPP.3 Bandung 183 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027364 28-Dec-2021 Bendahara Pengeluaran 25.712.215 100% 25.712.215,00 14.237 1.806,01 (PHLN,COREMAP,052) dari BPP.1 Ambon 184 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881701027367 28-Dec-2021 Bendahara Pengeluaran 9.632.500 100% 9.632.500,00 14.237 676,58 (PHLN,COREMAP,052) dari BPP.4 Mataram 185 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028456 30-Dec-2021 Bendahara Pengeluaran 269.721.512 100% 269.721.512,00 14.265 18.907,92 barang (PHLN,COREMAP, 052) dari BPP.2 Cibinong 186 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028250 29-Dec-2021 Bendahara Pengeluaran 322.649.900 100% 322.649.900,00 14.265 22.618,29 barang (PHLN,COREMAP, 052) dari BPP.5 P2O Jakarta 187 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027969 29-Dec-2021 Bendahara Pengeluaran 42.621.051 100% 42.621.051,00 14.265 2.987,81 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 188 Component 2 Pertangggungjawaban TUP untuk keperluan belanja LIPI 210881701027961 29-Dec-2021 Bendahara Pengeluaran 32.850.918 100% 32.850.918,00 14.265 2.302,90 Barang (PHLN,COREMAP, 052) dari BPP.3 Bandung 189 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027963 29-Dec-2021 Bendahara Pengeluaran 16.307.570 100% 16.307.570,00 14.265 1.143,19 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 190 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027965 29-Dec-2021 Bendahara Pengeluaran 21.449.818 100% 21.449.818,00 14.265 1.503,67 barang (PHLN,COREMAP, 052) Cofunding dari BPP.4 Mataram 191 Component 2 Pertanggungjawabann TUP untuk keperluan belanja LIPI 210881701027962 29-Dec-2021 Bendahara Pengeluaran 12.921.000 100% 12.921.000,00 14.265 905,78 barang (PHLN,COREMAP, 052) Cofunding dari BPP.3 Bandung 192 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027967 29-Dec-2021 Bendahara Pengeluaran 13.340.000 100% 13.340.000,00 14.265 935,16 barang (PHLN,COREMAP, 052) dari BPP.4 mataram 193 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028476 30-Dec-2021 Bendahara Pengeluaran 43.691.137 100% 43.691.137 14.269 3.061,96 barang (PHLN,COREMAP, 052) cofunding dari BP Pusat Jakarta 194 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701028495 30-Dec-2021 Bendahara Pengeluaran 60.602.392 100% 60.602.392,00 14.269 4.247,14 barang (PHLN, COREMAP,052) dari BPP.1 Ambon 195 Component 2 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701029683 3-Jan-2022 Bendahara Pengeluaran 94.984.000 100% 94.984.000 14.278 6.652,47 barang (PHLN,COREMAP, 052) dari BP Pusat Jakarta 196 Component 2 Penggantian UP untuk keperluan belanja barang LIPI 210881301019497 22-Oct-2021 Bendahara Pengeluaran 6.375.000,00 100% 6.375.000,00 14.165 450,050 (PHLN,COREMAP,052) dari BPP.4 Mataram, 197 Component 2 Penggantian UP untuk keperluan belanja Barang LIPI 210881301018075 7-Oct-2021 Bendahara Pengeluaran 48.122.000,00 100% 48.122.000,00 14.165 3.397,250 (PHLN,COREMAP,052) dari BPP.2 Cibinong TOTAL EXPENDITURES 14.023.108.403,02 14.023.108.403,02 14.305 980.321,79 LAMPIRAN V Statement of Expenditures BY COMPONENT 4 for the Reporting Period of Jan 01 to Dec 31, 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1 Component 4 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301001796 24 Februari 2021 Bendahara Pengeluaran 43.105.999,95 100% 43.105.999,95 14.089 3.059,55 Barang (COREMAP) Dari Bendahara Pengeluaran (Jakarta) 2 Component 4 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301001862 25 Februari 2021 Bendahara Pengeluaran 26.825.942,00 100% 26.825.942,00 14.300 1.875,94 Perjalanan Dinas ke Mataram -NTB, dalam rangka pendampingan kegiatan pemeriksaan cek fisik oleh BPK RI atas Pekerjaan Pembangunan Gedung Laboratorium BBIL Mataram LIPI, 3 Component 4 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301002967 12 Maret 2021 Bendahara Pengeluaran 39.901.094,10 100% 39.901.094,10 14.418 2.767,45 Barang (PHLN- COREMAP-053) Dari Bendahara Pengeluaran (Jakarta) 4 Component 4 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004795 9-Apr-2021 3.166.002,09 100% 3.166.002,09 14.631 216,39 Barang (PHLN,COREMAP,053) dari BPP.4 Mataram, Sesuai SPP Nomor 20026 Tanggal 9 April 2021 5 Component 4 Penggantian Uang Persediaan Untuk Keperluan Belanja LIPI 210881301004746 8-Apr-2021 14.138.959,47 100% 14.138.959,47 14.631 966,37 Barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20024 Tanggal 8 April 2021 6 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002865 13-Apr-2021 9.422.071,38 100% 9.422.071,38 14.631 643,98 barang (PHLN,COREMAP,053) dari BPP.2 Cibinong, Sesuai SPP Nomor 20034 Tanggal 12 April 2021 7 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002862 13-Apr-2021 225.024,78 100% 225.024,78 14.631 15,38 Barang (PHLN,COREMAP,053) dari BPP.5 P2O Jakarta, Sesuai SPP Nomor 20031 Tanggal 12 April 2021 8 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701002961 15-Apr-2021 11.692.791,31 100% 11.692.791,31 14.633 799,07 barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20040 Tanggal 15 April 2021 9 Component 4 Pertanggungjawaban TUP Untuk Keperluan Belanja LIPI 210881701002957 14-Apr-2021 14.396.530,72 100% 14.396.530,72 14.633 983,84 Barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20037 Tanggal 14 April 2021 10 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005437 17-May-2021 5.582.915,24 100% 5.582.915,24 14.203 393,08 barang (PHLN,COREMAP,053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20065 Tanggal 17 Mei 2021 11 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701005432 17-May-2021 2.980.641,58 100% 2.980.641,58 14.203 209,86 barang (PHLN,COREMAP,053) dari BPP.5. P2O Jakarta, Sesuai SPP Nomor 20061 Tanggal 17 Mei 2021 12 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008430 21-Jun-2021 8.161.898,16 100% 8.161.898,16 14.453 564,72 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20094 Tanggal 18 Juni 2021 13 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701008268 18-Jun-2021 103.432.749,97 100% 103.432.749,97 14.453 7.156,49 barang (PHLN,COREMAP 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20090 Tanggal 18 Juni 2021 14 Component 4 Penggantian UP untuk keperluan belanja barang LIPI 210881301011985 19/07/2021 Bendahara Pengeluaran 14.521.200,00 100% 14.521.200,00 14.524 999,81 (PHLN,COREMAP,053) dari BPP.1 Ambon, Sesuai SPP Nomor 20110 Tanggal 16 Juli 2021 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Component 4 pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701010931 28/07/2021 Bendahara Pengeluaran 34.791.402,00 100% 34.791.402,00 14.498 2.399,74 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, Sesuai SPP Nomor 20116 Tanggal 27 Juli 2021 16 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701013253 31/08/2021 Bendahara Pengeluaran 35.380.300,00 100% 35.380.300,00 14.374 2.461,41 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta, 17 Component 4 \Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301015594 07/09/2021 Bendahara Pengeluaran 77.190.000,00 100% 77.190.000,00 14.272 5.408,49 Perjalanan Dinas (PHLN, COREMAP,053) dalam rangka pelaksanaan FGD dan Indepth Interview Pelaku Kunci Coremap CTI di Gedung Kusnoto, Bogor Jawa Barat 18 Component 4 Penggantian UP untuk keperluan belaja barang LIPI 210881301016785 21-Sep-2021 Bendahara Pengeluaran 34.130.800,00 100% 34.130.800,00 14.165 2.409,52 (PHLN,COREMAP,053) dari BP Pusat jakarta 19 Component 4 Pembayaran Belanja barang berupa pembayaran LIPI 210881301016765 21-Sep-2021 Bendahara Pengeluaran 124.260.000,00 100% 124.260.000,00 14.165 8.772,33 perjalanan dinas (PHLN, COREMAP,053) dalam rangka monitoring safeguard RHM Coremap CTI di Mataram, NTB (Irfan Kampono) dan di Kab. Sikka, NTT (Deni Sutisna) tanggal 16 s.d. 21 September 2021 20 Component 4 Penggantian UP untu keperluan belanja barang LIPI 210881301017044 24-Sep-2021 Bendahara Pengeluaran 8.750.644,00 100% 8.750.644,00 14.165 617,77 (PHLN,COREMAP,053) dari B BPP.4 Mataram 21 Component 4 Pembayaran Belanja Barang (PHLN,COREMAP,053) LIPI 210881301019525 22-Oct-2021 Bendahara Pengeluaran 24.888.000,00 100% 24.888.000,00 14.165 1.757,01 berupa Perjalanan Dinas dalam rangka Pemeriksaan Fisik dan Serah Terima Pekerjaan Pengadaan Belanja Modal Peralatan dan Mesin Berupa Furniture Laboratorium BBIL Mataram di Lombok, NTB 22 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701015362 29-Sep-2021 Bendahara Pengeluaran 47.805.600,00 100% 47.805.600,00 14.165 3.374,91 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 23 Component 4 Pembayaran Belanja Barang berupa Pembayaran LIPI 210881301017378 29-Sep-2021 Bendahara Pengeluaran 158.560.000,00 100% 158.560.000,00 14.165 11.193,79 Perjalanan Dinas (PHLN, COREMAP,053) dalam rangka monitoring keamanan lingkungan dan social safeguard kegiatan reef Health Index and Related Ecosystem COREMAP CTI tanggal 3 s.d. 8 Oktober 2021 24 Component 4 Pembayaran Belanja Barang (PHLN,COREMAP,053) LIPI 210881303018585 08-Nov-21 1041065736 tanggal 13 PT. Kawan Lama Sejahtera 35.938.000 100% 35.938.000 14.268 2.518,78 berupa Pengadaan Waste Bin Role Stainless Matt 40L Oktober 2021 untuk Kantor Pusat Penelitian Oseanografi LIPI sesuai dengan Invoice nomor 1041065736 tanggal 13 Oktober 2021 25 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701020455 16-Nov-21 Bendahara Pengeluaran 73.950.854 100% 73.950.854 14.211 5.203,78 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 26 Component 4 Pembayaran belanja barang (PHLN,COREMAP,053) LIPI 210881301022039 18-Nov-21 Bendahara Pengeluaran 47.360.000,00 100% 47.360.000 14.231 3.327,95 berupa perjalanan dinas dalam rangka Koordinasi dan pengurusan dokumen pertanggungjawaban keuangan kegiatan Coremap CTI dan penyelesaian pembayaran dokumen dokumen kontrak LOB RHM Teluk Cenderawasih 27 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701021967 29-Nov-21 Bendahara Pengeluaran 3.693.000,00 100% 3.693.000 14.340 257,53 barang (PHLN,COREMAP, 053) dari BPP.5 P2O Jakarta 28 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701022038 30-Nov-21 Bendahara Pengeluaran 440.000,00 100% 440.000 14.340 30,68 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 29 Component 4 Penggantian UP untuk keperluan belanja barang LIPI 210881301024304 7-Dec-2021 Bendahara Pengeluaran 31.830.029,00 100% 31.830.029,00 14.348 2.218,43 (PHLN,COREMAP,053) dari BP Pusat Jakarta 1 2 3 4 5 6 7 8 9 10 11 12 13 14 30 Component 4 Penggantian UP untuk keperluan belanja barang LIPI 210881301023400 1-Dec-2021 Bendahara Pengeluaran 79.688.200,00 100% 79.688.200,00 14.348 5.553,96 (PHLN,COREMAP, 053) dari BP Pusat Jakarta 31 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701022430 1-Dec-2021 Bendahara Pengeluaran 14.427.750,00 100% 14.427.750,00 14.348 1.005,56 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 32 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701023692 14-Dec-2021 Bendahara Pengeluaran 29.523.940 100% 29.523.940,00 14.348 2.057,70 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta 33 Component 4 Pembayaran belanja barang (PHLN,COREMAP,053) LIPI 210881302019983 16-Dec-2021 kwitansi Nomor 110/K/CV- CV. Pancuran Emas Jaya 48.068.500 100% 48.068.500,00 14.343 3.351,36 berupa pembayaran Pengadaan Perlengakapan Lapangan PEJ/XII/2021 Tanggal 16 untuk Tim Teknis Desember 2021 34 Component 4 Pertanggungjawaban TUP untuk keperluan belanja LIPI 210881701027964 29-Dec-2021 Bendahara Pengeluaran 424.000 100% 424.000,00 14.265 29,72 barang (PHLN,COREMAP, 053) dari BPP.4 Mataram 35 Component 4 Penggantian Uang Persediaan untuk keperluan belanja LIPI 210881701028477 30-Dec-2021 Bendahara Pengeluaran 64.293.767 100% 64.293.767 14.269 4.505,84 barang (PHLN, COREMAP,053) dari BP Pusat Jakarta 36 Component 4 Pertanggungjawaban TUP untuk keperluan belanjan LIPI 210881701029684 3-Jan-2022 Bendahara Pengeluaran 3.838.000 100% 3.838.000 14.278 268,81 barang (PHLN,COREMAP, 053) dari BP Pusat Jakarta TOTAL EXPENDITURES 1.276.786.606,75 1.276.786.606,75 14.285 89.377,00