PROCUREMENT PLAN (Textual Part) Project information: [country] [Project name] [P-number] Project Implementation agency: [insert legal name] Date of the Procurement Plan: [insert date] Period covered by this Procurement Plan: [insert from – to period] Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in [insert appropriate references to the national procurement legislation], such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Other Relevant Procurement Information. Provide any other relevant procurement information such as procedures for CDD components, Procurement in Situations of Urgent Need of Assistance or Capacity Constraints etc. PROCUREMENT Benin : Gazetted Forests Management Project PLAN General Information Country: Benin 2019-11-11 Bank’s Approval Date of the Original Procurement Plan: 2024-02-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P167678 GPN Date: 2019-10-15 Project Name: Gazetted Forests Management Project Loan / Credit No: IDA / D4770 GENERAL DIRECTORATE FOR ENVIRONMENT AND CLIMATE Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BJ-WACA -142583-CW-RFB / Integrated Management of G Single Stage - One E 2021-06-1 Travaux de conception et d'o IDA / D4770 A posteriori Appel d'offres Open - National 400,000.00 0.00 Annulé 2020-08-24 2020-08-29 2020-10-10 2020-11-09 2020-12-14 azetted Forests nvelope 2 uverture des pistes d'accès. BJ-WACA -142587-CW-RFQ / Travaux de préparation de so Integrated Management of G Single Stage - One E 2021-04-1 IDA / D4770 A posteriori Demande de prix Limited 150,000.00 0.00 Annulé 2020-08-22 2020-10-17 l (Défrichement, dégagement azetted Forests nvelope 5 et dessouchage). BJ-WACA -142590-CW-CDD / Production du plant/pépiniéri Participation com ste au niveau des six (06) fo Integrated Management of G munautaire à la p 2021-04-1 IDA / D4770 A posteriori Limited 180,000.00 290,792.91 Signé 2020-06-23 2021-10-12 2020-06-28 2021-10-12 2020-08-09 2020-03-04 2020-09-08 2021-10-12 2020-10-13 2020-05-09 rêts classées : Kétou, Dan, Lo azetted Forests assation des marc 1 gozohè, Ouémé-Boukou, Ago hés ua, Tchaourou-Toui-Kilibo. BJ-WACA -142603-CW-CDD / Participation com Travaux de production du pla Integrated Management of G munautaire à la p 2021-01-0 IDA / D4770 A posteriori Limited 465,000.00 0.00 Annulé 2020-03-23 2020-03-28 2020-05-09 2020-06-08 2020-07-13 nt de la forêt de Dogo par les azetted Forests assation des marc 9 pépiniéristes locaux. hés BJ-WACA -142604-CW-CDD / Participation com Travaux de production du pla Integrated Management of G munautaire à la p 2021-01-0 IDA / D4770 A posteriori Limited 150,000.00 0.00 Annulé 2020-03-23 2020-03-28 2020-05-09 2020-06-08 2020-07-13 nt des six (06) Forêts Classée azetted Forests assation des marc 9 s par les pépiniéristes locaux hés . BJ-WACA -142605-CW-CDD / Participation com Travaux de réalisation de 60 Integrated Management of G munautaire à la p 1,137,458.8 2021-09-1 0 ha de plantation de bois én IDA / D4770 A posteriori Limited 570,200.00 Signé 2020-11-23 2021-10-12 2020-11-28 2021-10-12 2021-01-09 2020-03-04 2021-02-08 2021-10-12 2021-03-15 2020-07-09 azetted Forests assation des marc 8 1 ergie par les structure de cog hés estion à raison de 100 ha par forêt classée. BJ-WACA -142606-CW-CDD / Élaborer et signer une conve Participation com ntion avec l'ONAB pour réali Integrated Management of G munautaire à la p 2021-04-1 IDA / D4770 A posteriori Limited 296,813.00 0.00 Annulé 2020-06-22 2020-06-27 2020-08-08 2020-09-07 2020-10-12 ser 750 ha de plantation de b azetted Forests assation des marc 0 ois d'oeuvre dans la forêt cla hés ssées de Dogo et l'entretien des plantations. BJ-WACA -142891-CW-RFQ / Travaux de construction de p Integrated Management of G Single Stage - One E 2021-05-2 IDA / D4770 A posteriori Demande de prix Limited 150,000.00 0.00 Annulé 2020-10-05 2020-11-30 ostes de contrôle,de mirador azetted Forests nvelope 9 s, d'installation des barrières (ONAB et CTAF). BJ-WACA -142892-CW-RFB / Integrated Management of G Single Stage - One E 2021-07-1 IDA / D4770 A posteriori Appel d'offres Open - National 400,000.00 0.00 Annulé 2020-09-23 2020-09-28 2020-11-09 2020-12-09 2021-01-13 Travaux de forages (ONAB). azetted Forests nvelope 2 BJ-WACA -142893-CW-RFQ / Travaux de morcellement de s séries agricoles, matérialisa tion et d'attribution des parc Integrated Management of G Single Stage - One E 2021-02-2 IDA / D4770 A posteriori Demande de prix Limited 140,000.00 0.00 Annulé 2020-06-29 2020-08-24 elles d'exploitation agricole a azetted Forests nvelope 0 ux agricultures dans les six ( 06) forêts classées: Kétou,Da n, Logozohè, Ouémé-boukou, Agoua, Tchaourou-Toui-Kilibo . BJ-WACA -142894-CW-RFQ / Travaux d'identification et de Integrated Management of G Single Stage - One E 2021-04-2 IDA / D4770 A posteriori Demande de prix Limited 40,000.00 0.00 Annulé 2020-08-31 2020-10-26 matérialisation des couloirs d azetted Forests nvelope 4 e transhumance et les aires de pâturage. BJ-WACA -142895-CW-RFQ / Travaux de matérialisation d es limites de la série de cons Integrated Management of G Single Stage - One E 2021-03-2 IDA / D4770 A posteriori Demande de prix Limited 70,000.00 0.00 Annulé 2020-08-04 2020-09-29 ervation des six (06) forêts cl azetted Forests nvelope 8 assées : Kétou, Dan, Logozoh è, Ouémé-Boukou,Agoua, Tc haourou-Toui-Kilibo. BJ-WACA -142896-CW-RFQ / Travaux de pare feux autour Integrated Management of G Single Stage - One E 2021-04-2 IDA / D4770 A posteriori Demande de prix Limited 36,000.00 0.00 Annulé 2020-09-01 2020-10-27 des séries de conservation d azetted Forests nvelope 5 es forêts classées. BJ-WACA -148865-CW-RFQ / Integrated Management of G Single Stage - One E 2021-05-2 IDA / D4770 A posteriori Demande de prix Limited 40,000.00 0.00 Annulé 2020-10-03 2020-11-28 Travaux de forage (ONAB). azetted Forests nvelope 7 BJ-WACA -217647-CS-CDS / Participation com Elaborer et signer des conve munautaire à la p En attente d 2021-12-0 ntions de production de plant IDA / D4770 Project Management A posteriori Direct 1,708,000.00 0.00 2021-04-28 2021-05-03 2021-06-07 assation des marc 'exécution 4 s avec des structures de cog hés estion au profit de l'UIGP et d e l'ONAB. BJ-WACA -217651-CS-CDS / Participation com Elaborer et signer des conve Integrated Management of G munautaire à la p En attente d 2022-04-3 ntions de reboisement avec IDA / D4770 A posteriori Direct 1,906,000.00 0.00 2021-09-22 2021-09-27 2021-11-01 azetted Forests assation des marc 'exécution 0 des structures de cogestion a hés u profit de l'UIGP et de l'ONA B. BJ-WACA -217653-CS-CDS / Participation com Elaborer et signer des conve Integrated Management of G munautaire à la p 2022-05-2 ntions d'entretien et regamis IDA / D4770 A posteriori Direct 806,100.00 0.00 Annulé 2021-10-18 2021-10-23 2021-11-27 azetted Forests assation des marc 6 sage avec des structures de hés cogestion au profit de l'UIGP et de l'ONAB. Page 1 BJ-WACA -217661-CW-RFQ / Travaux d'ouverture et d'am Single Stage - One E 2022-06-2 IDA / D4770 Project Management A posteriori Demande de prix Open - National 200,000.00 0.00 Annulé 2021-11-04 2021-12-30 énagement des pistes d'accè nvelope 8 s aux plantation de 2020 et 2 021. BJ-WACA -217663-CW-RFB / Travaux de réhabilitation/con Single Stage - One E En cours d'e 2022-05-0 IDA / D4770 Project Management A posteriori Appel d'offres Open - National 400,000.00 0.00 2021-07-20 2022-11-07 2021-07-25 2022-11-08 2021-09-05 2021-10-05 2021-11-09 struction/équipement des ba nvelope xécution 8 ses vie des CTAF. BJ-WACA -217664-CW-RFQ / Integrated Management of G Single Stage - One E 2022-01-2 Travaux de forage au niveau IDA / D4770 A posteriori Demande de prix Open - National 180,000.00 0.00 Annulé 2021-05-31 2021-07-26 azetted Forests nvelope 2 des sites des bases vies des CTAF. BJ-WACA -217667-CW-RFQ / Confection et pose des plaqu Integrated Management of G Single Stage - One E En attente d 2022-07-2 IDA / D4770 A posteriori Demande de prix Open - National 40,000.00 0.00 2021-11-28 2022-01-23 es de matérialisation des dou azetted Forests nvelope 'exécution 2 ze (12) forêts classées. BJ-WACA -217670-CW-RFQ / Travaux de construction de p Integrated Management of G Single Stage - One E 2022-05-2 IDA / D4770 A posteriori Demande de prix Open - National 60,000.00 0.00 Annulé 2021-10-03 2021-11-28 ostes de contrôle et d'install azetted Forests nvelope 7 ation des barrières au profit de l'ONAB. BJ-WACA -217671-CW-RFQ / Support to Forests Governan Single Stage - One E 2021-11-2 Travaux d'extension et d'am IDA / D4770 A posteriori Demande de prix Open - National 10,000.00 0.00 Annulé 2021-04-05 2021-05-31 ce nvelope 7 énagement de bureaux. BJ-WACA -217668-CW-RFQ / Travaux de construction et d' Integrated Management of G Single Stage - One E En attente d 2022-07-1 IDA / D4770 A posteriori Demande de prix Open - National 32,000.00 0.00 2021-11-16 2022-01-11 équipement des postes de ga azetted Forests nvelope 'exécution 0 rdiennage dans les forêts cla ssées. Document nation BJ-WACA -232702-CW-DIR / al de passation de Travaux d'ouverture et de re Integrated Management of G Passation de marc s marchés - Proce 2022-01-3 IDA / D4770 A posteriori Direct 228,000.00 339,690.20 Signé 2021-06-24 2021-05-19 2021-06-29 2021-10-07 2021-08-03 2021-10-11 profilage de pistes forestière azetted Forests hé de gré à gré ssus à une envelo 0 s. ppe (DTPM ne pro venant pas de la Banque) Document nation BJ-WACA -279783-CW-RFQ / al de passation de Réalisation des travaux d’ou s marchés - Proce verture , de profilage de pist Single Stage - One E En cours d'e 2023-01-1 IDA / D4770 Project Management A posteriori Demande de prix Limited ssus à une envelo 200,000.00 0.00 2022-05-23 2022-07-18 es forestières et de construct nvelope xécution 4 ppe (DTPM ne pro ion des ouvrages de franchis venant pas de la sement dans les forêts classé Banque) es de Dan et Logozohè. Document nation BJ-WACA -279790-CW-RFQ / al de passation de Réalisation des travaux d’ou s marchés - Proce verture , de profilage de pist Single Stage - One E En cours d'e 2023-01-2 IDA / D4770 Project Management A posteriori Demande de prix Limited ssus à une envelo 200,000.00 0.00 2022-05-29 2023-10-05 2022-07-24 es forestières et de construct nvelope xécution 0 ppe (DTPM ne pro ion des ouvrages de franchis venant pas de la sement dans la forêt classée Banque) de Tchaourou-Toui- Kilibo. Document nation BJ-WACA -279794-CW-RFQ / al de passation de Réalisation des travaux d’ou s marchés - Proce verture , de profilage de pist Single Stage - One E En cours d'e 2023-01-1 IDA / D4770 Project Management A posteriori Demande de prix Limited ssus à une envelo 200,000.00 0.00 2022-05-25 2022-07-20 es forestières et de construct nvelope xécution 6 ppe (DTPM ne pro ion des ouvrages de franchis venant pas de la sement dans la forêt classée Banque) de Ouémé Boukou. Document nation BJ-WACA -279789-CW-RFQ / al de passation de Réalisation des travaux d’ou s marchés - Proce verture , de profilage de pist Single Stage - One E 2023-01-2 IDA / D4770 Project Management A posteriori Demande de prix Limited ssus à une envelo 200,000.00 0.00 Signé 2022-05-29 2022-06-22 2022-07-24 2022-10-21 es forestières et de construct nvelope 0 ppe (DTPM ne pro ion des ouvrages de franchis venant pas de la sement dans la forêt classée Banque) de Agoua. Document nation BJ-WACA -279785-CW-RFQ / al de passation de Réalisation des travaux d’ou s marchés - Proce verture , de profilage de pist Single Stage - One E En cours d'e 2023-01-2 IDA / D4770 Project Management A posteriori Demande de prix Limited ssus à une envelo 200,000.00 0.00 2022-05-29 2022-07-24 es forestières et de construct nvelope xécution 0 ppe (DTPM ne pro ion des ouvrages de franchis venant pas de la sement dans la forêt classée Banque) de Kétou. BJ-WACA -354309-CW-RFQ / Demande de cota Réaliser les travaux d'ouvert tions - DTPM Petit Integrated Management of G Single Stage - One E En attente d 2024-02-1 ure et d'aménagement des IDA / D4770 A posteriori Demande de prix Limited s travaux (urgenc 200,000.00 0.00 2023-06-24 2023-08-19 azetted Forests nvelope 'exécution 5 pistes d'accès aux plantation e) - Avec compéti s de la forêts classée de Ago tion ua. BJ-WACA -354326-CW-RFQ / Demande de cota Réaliser les travaux d'ouvert tions - DTPM Petit Integrated Management of G Single Stage - One E En attente d 2024-02-0 ure et d'aménagement des IDA / D4770 A posteriori Demande de prix Limited s travaux (urgenc 200,000.00 0.00 2023-06-12 2023-08-07 azetted Forests nvelope 'exécution 3 pistes d'accès aux plantation e) - Avec compéti s de la forêts classée de Logo tion zohè. BJ-WACA -354339-CW-RFQ / Demande de cota Réaliser les travaux d'ouvert tions - DTPM Petit Integrated Management of G Single Stage - One E En attente d 2024-02-0 ure et d'aménagement des IDA / D4770 A posteriori Demande de prix Limited s travaux (urgenc 200,000.00 0.00 2023-06-18 2023-08-13 azetted Forests nvelope 'exécution 9 pistes d'accès aux plantation e) - Avec compéti s de la forêts classée de TTK. tion BJ-WACA -354273-CW-RFQ / Demande de cota Réaliser les travaux d'ouvert tions - DTPM Petit Integrated Management of G Single Stage - One E En attente d 2024-01-2 ure et d'aménagement des IDA / D4770 A posteriori Demande de prix Limited s travaux (urgenc 200,000.00 0.00 2023-06-05 2023-07-31 azetted Forests nvelope 'exécution 7 pistes d'accès aux plantation e) - Avec compéti s de la forêts classée de Dan. tion BJ-WACA -354551-CW-RFQ / Demande de cota Réaliser les travaux d'ouvert tions - DTPM Petit Integrated Management of G Single Stage - One E En attente d 2024-02-1 ure et d'aménagement des pi IDA / D4770 A posteriori Demande de prix Limited s travaux (urgenc 200,000.00 0.00 2023-06-27 2023-08-22 azetted Forests nvelope 'exécution 8 stes d'accès aux plantations e) - Avec compéti de la forêts classée de Kétou. tion Document nation BJ-WACA -322980-CW-RFQ / al de passation de Travaux de construction de h Integrated Management of G Single Stage - One E s marchés - Proce En attente d 2023-07-1 IDA / D4770 A posteriori Demande de prix Limited 200,000.00 0.00 2022-11-19 2023-01-14 uit (08) postes de gardienna azetted Forests nvelope ssus à une envelo 'exécution 3 ge. ppe (DTPM ne pro venant pas de la Banque) BJ-WACA -354330-CW-RFQ / Demande de cota Réaliser les travaux d'ouvert tions - DTPM Petit Integrated Management of G Single Stage - One E En attente d 2024-02-0 ure et d'aménagement des IDA / D4770 A posteriori Demande de prix Limited s travaux (urgenc 200,000.00 0.00 2023-06-17 2023-08-12 azetted Forests nvelope 'exécution 8 pistes d'accès aux plantation e) - Avec compéti s de la forêts classée de Oué tion mé-Boukou. Page 2 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -142491-GO-RFB / Acquisition de cent vingt-cin Integrated Management of G Open - Internationa Single Stage - One E IDA / D4770 A posteriori Appel d'offres 1,331,200.00 0.00 Annulé 2020-04-20 2020-04-25 2020-06-06 2020-07-06 2020-08-10 2021-02-06 q (125) motos et de sept (07) azetted Forests l nvelope camions citerne à eau au pr ofit du projet. BJ-WACA -142559-GO-RFQ / contractualiser avec un opér ateur GSM pour assurer la co Development of Selected NT Single Stage - One E IDA / D4770 A posteriori Demande de prix Limited 64,600.00 0.00 Annulé 2020-05-02 2020-06-27 2020-12-24 mmunication et la connexion FP Value Chains nvelope à l'internet des Cellules Tech niques d'Aménagement Fore stiers (CTAF) BJ-WACA -142576-GO-RFQ / Acquisition de petits équipe Integrated Management of G Single Stage - One E IDA / D4770 A posteriori Demande de prix Limited 17,000.00 17,660.17 Signé 2020-03-22 2021-06-18 2020-05-17 2021-07-01 2020-11-13 ments de surveillance (GPS, J azetted Forests nvelope umelles, Boussole, Clisimètre , compas forestier). BJ-WACA -142581-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition d'équipement inf IDA / D4770 A posteriori Demande de prix Limited 80,000.00 0.00 Annulé 2020-03-29 2020-05-24 2020-11-20 ce nvelope ormatique au profit du projet et de l'ONAB. BJ-WACA -142697-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition de consommable IDA / D4770 A posteriori Demande de prix Limited 15,000.00 13,428.63 Signé 2020-01-25 2021-06-21 2020-03-21 2021-07-04 2020-09-17 ce nvelope s informatiques au profit du projet. BJ-WACA -142740-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition de fourniture de b IDA / D4770 A posteriori Demande de prix Limited 14,000.00 12,534.18 Signé 2020-01-18 2019-11-19 2020-03-14 2021-06-30 2020-09-10 ce nvelope ureau au profit du projet. BJ-WACA -142804-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition de mobiliers de b IDA / D4770 A posteriori Demande de prix Limited 18,500.00 11,742.34 Signé 2020-01-18 2021-06-23 2020-03-14 2021-06-26 2020-09-10 ce nvelope ureau au profit du projet. BJ-WACA -142818-GO-RFQ / Acquisition de motopompes Integrated Management of G Single Stage - One E et de petits outillages (Arroso IDA / D4770 A posteriori Demande de prix Limited 14,000.00 17,904.17 Signé 2020-03-21 2021-06-22 2020-05-16 2021-07-05 2020-11-12 azetted Forests nvelope ir, rateau, houe, seau, bassin e) au profit de l'ONAB et CTA F. BJ-WACA -142826-GO-RFQ / Acquisition des matériels et é Integrated Management of G Single Stage - One E En attente d' IDA / D4770 A posteriori Demande de prix Limited 76,000.00 0.00 2020-05-23 2020-07-18 2021-01-14 quipement de lutte contre le azetted Forests nvelope exécution feu au profit des CTAF et ON AB. BJ-WACA -142867-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition des matériels et é IDA / D4770 A posteriori Demande de prix Limited 19,000.00 17,131.79 Signé 2020-02-22 2021-06-22 2020-04-18 2021-07-05 2020-10-15 ce nvelope quipements de bureau au pr ofit du projet. BJ-WACA -142872-GO-RFQ / Support to Forests Governan Single Stage - One E Fourniture de la connexion in IDA / D4770 A posteriori Demande de prix Limited 13,000.00 0.00 Annulé 2020-01-18 2020-03-14 2020-09-10 ce nvelope ternet dans les bâtiments du projet. BJ-WACA -142483-GO-UN / A Passation de marc cquisition de dix-sept (17) vé Support to Forests Governan IDA / D4770 A posteriori hés auprès des ag Direct 759,000.00 0.00 Annulé 2020-02-17 2020-02-22 2020-03-28 2020-09-24 hicules 4x4 dont quinze (15) ce ences de l'ONU pick-up double cabine, deux ( 02) Stations Wagon. BJ-WACA -142815-GO-DIR / F Support to Forests Governan Passation de marc ourniture et installation de lo IDA / D4770 A posteriori Direct 20,000.00 9,420.57 Signé 2020-03-27 2021-06-18 2020-04-01 2021-06-18 2020-05-06 2021-06-23 2020-11-02 ce hé de gré à gré giciel comptable au profit du projet. BJ-WACA -142861-NC-DIR / A cquisition des semences dan Integrated Management of G Single Stage - One E IDA / D4770 A posteriori Demande de prix Limited 29,900.00 0.00 Annulé 2020-04-25 2020-06-20 2020-12-17 s le cadre de la production d azetted Forests nvelope es plants d'essence de bois é nergie. BJ-WACA -142803-GO-DIR / Integrated Management of G Single Stage - One E Acquisition de semence d’es IDA / D4770 A posteriori Demande de prix Limited 20,000.00 0.00 Annulé 2020-05-03 2020-06-28 2020-12-25 azetted Forests nvelope pèces fertilisantes et plants d ’agrosforesterie. BJ-WACA -148868-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition d'équipements inf IDA / D4770 A posteriori Demande de prix Limited 19,600.00 17,753.77 Signé 2020-03-29 2021-06-21 2020-05-24 2021-07-02 2020-11-20 ce nvelope ormatiques au profit du proje t. BJ-WACA -150068-GO-UN / A cquisition de vingt-sept (27) Passation de marc Support to Forests Governan véhicules 4 x 4 dont quatorz IDA / D4770 A posteriori hés auprès des ag Direct 1,170,000.00 947,496.76 Signé 2020-02-17 2021-06-18 2020-02-22 2021-06-18 2020-03-28 2021-07-01 2020-09-24 ce e (14) pick-up double cabines ences de l'ONU , onze (11) mono cabines et deux (02) stations wagon. BJ-WACA -160122-GO-RFB / Acquisition de cent vingt-cin Integrated Management of G Single Stage - One E IDA / D4770 A posteriori Appel d'offres Open - National 325,600.00 0.00 Annulé 2020-06-30 2020-03-16 2020-07-05 2020-08-16 2020-09-15 2020-10-20 2021-04-18 q (125) motos au profit de CT azetted Forests nvelope AF, ONAB et CENATEL. BJ-WACA -166588-GO-DIR / F ourniture, installation et mai Support to Forests Governan Passation de marc IDA / D4770 A posteriori Direct 48,700.00 83,531.04 Signé 2020-04-27 2021-10-07 2020-05-02 2021-10-07 2020-06-06 2020-05-06 2020-12-03 ntenance d'une plateforme d ce hé de gré à gré e vidéoconférence au profit d u MCVDD. BJ-WACA -170502-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition de groupe électro IDA / D4770 A posteriori Demande de prix Limited 27,800.00 52,751.58 Signé 2020-06-27 2021-06-18 2020-08-22 2021-07-02 2021-02-18 ce nvelope gène au profit de l'UIGP. BJ-WACA -173868-GO-UN / A Passation de marc cquisition de cent vingt-cinq Support to Forests Governan IDA / D4770 A posteriori hés auprès des ag Direct 450,300.00 530,271.00 Signé 2020-05-25 2021-06-03 2020-05-30 2021-06-03 2020-07-04 2021-07-02 2020-12-31 (125) motos cross et trois (0 ce ences de l'ONU 3) stations wagon au profit d e l'UIGP. BJ-WACA -217675-GO-RFQ / Acquisition de consommable Support to Forests Governan Single Stage - One E IDA / D4770 A posteriori Demande de prix Limited 50,000.00 52,699.95 Signé 2021-04-25 2021-10-07 2021-06-20 2021-07-12 2021-12-17 s informatiques au profit du ce nvelope projet, CTAF et ONAB. Page 3 BJ-WACA -217676-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition de fournitures de IDA / D4770 A posteriori Demande de prix Limited 53,000.00 78,807.91 Signé 2021-04-04 2021-10-07 2021-05-30 2021-08-23 2021-11-26 ce nvelope bureau au profit du projet, C TAF et ONAB. BJ-WACA -217677-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition de matériels infor IDA / D4770 A posteriori Demande de prix Limited 83,000.00 73,116.38 Signé 2021-04-04 2021-10-07 2021-05-30 2021-07-27 2021-11-26 ce nvelope matiques au profit du projet, CTAF et ONAB. BJ-WACA -217682-GO-RFQ / Acquisition de matériels pour Single Stage - One E IDA / D4770 Project Management A posteriori Demande de prix Limited 9,500.00 8,412.70 Signé 2021-05-31 2021-06-24 2021-07-26 2021-06-28 2022-01-22 la mise en place du Manuel d nvelope e Gestion des Plainte (MGP). BJ-WACA -217747-GO-RFQ / Acquisition de petits équipe Single Stage - One E IDA / D4770 Project Management A posteriori Demande de prix Limited 40,000.00 38,473.75 Signé 2021-08-23 2021-10-07 2021-10-18 2021-08-06 2022-04-16 ments de surveillance au pro nvelope fit de l'ONAB et CTAF. BJ-WACA -217748-GO-RFQ / Single Stage - One E Acquisition de matériels pour IDA / D4770 Project Management A posteriori Demande de prix Limited 30,000.00 33,063.28 Signé 2021-10-23 2022-06-11 2021-12-18 2021-07-27 2022-06-16 nvelope les groupes de reboisement. BJ-WACA -217749-GO-RFQ / Acquisition d'équipements de Single Stage - One E En attente d' IDA / D4770 Project Management A posteriori Demande de prix Limited 76,000.00 0.00 2021-10-04 2021-11-29 2022-05-28 protection individuelle de lutt nvelope exécution e contre le feu au profit des CTAF et ONAB. BJ-WACA -217752-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition de matériels et é IDA / D4770 A posteriori Demande de prix Limited 19,000.00 18,053.77 Signé 2021-03-31 2021-05-20 2021-05-26 2021-06-21 2021-11-22 ce nvelope quipements de bureau. BJ-WACA -217794-GO-RFQ / Support to Forests Governan Single Stage - One E Acquisition et pose d'une ens IDA / D4770 A posteriori Demande de prix Limited 16,000.00 8,199.34 Signé 2021-03-20 2021-10-07 2021-05-15 2021-08-22 2021-11-11 ce nvelope eigne lumineuse au profit du projet. BJ-WACA -232705-GO-RFB / Passation de marc Acquisition de sept (07) cami IDA / D4770 Project Management A posteriori Direct 840,000.00 0.00 Annulé 2021-09-21 2021-05-19 2021-09-26 2021-10-31 2022-04-29 hé de gré à gré ons citerne au profit des CTA F et ONAB BJ-WACA -261178-GO-RFQ / Acquisition des équipements Single Stage - One E de traking des moyens roula IDA / D4770 Project Management A posteriori Demande de prix Limited 80,000.00 0.00 Signé 2021-12-20 2022-06-11 2022-02-14 2022-09-15 2022-08-13 nvelope nt des CTAF pour les patrouill es SMART en forêt classée. BJ-WACA -261184-GO-RFQ / Acquisition des équipements Single Stage - One E En cours d'ex IDA / D4770 Project Management A posteriori Demande de prix Limited 70,000.00 0.00 2021-12-04 2022-06-11 2022-01-29 2022-07-28 de communication pour les p nvelope écution atrouilles SMART en forêt cla ssée. BJ-WACA -279373-GO-RFB / Acquisitions des matériels et Integrated Management of G Single Stage - One E En attente d' IDA / D4770 A posteriori Appel d'offres Open - National 146,000.00 0.00 2022-09-22 2022-09-27 2022-11-08 2022-12-08 2023-01-12 2023-07-11 équipements légers pour la c azetted Forests nvelope exécution artographie et la surveillance des forêts. BJ-WACA -279374-GO-RFQ / Integrated Management of G Single Stage - One E Acquisition de matériels et é IDA / D4770 A posteriori Demande de prix Limited 19,000.00 15,500.44 Signé 2022-05-23 2022-06-11 2022-07-18 2022-08-06 2023-01-14 azetted Forests nvelope quipements de bureau au pr ofit du projet. BJ-WACA -279368-GO-RFQ / Acquisition de consommable Single Stage - One E IDA / D4770 Project Management A posteriori Demande de prix Limited 30,000.00 0.00 Signé 2022-05-03 2022-06-11 2022-06-28 2022-09-17 2022-12-25 s informatiques au profit du nvelope projet et des CTAF. BJ-WACA -279369-GO-RFQ / Acquisition de fournitures de Single Stage - One E IDA / D4770 Project Management A posteriori Demande de prix Limited 72,000.00 0.00 Signé 2022-05-04 2022-06-11 2022-06-29 2022-09-20 2022-12-26 bureau au profit du projet de nvelope l'ONAB et des CTAF. BJ-WACA -279370-GO-RFQ / Single Stage - One E Acquisition de matériels infor IDA / D4770 Project Management A posteriori Demande de prix Limited 70,000.00 0.00 Signé 2022-05-15 2022-06-11 2022-07-10 2022-09-15 2023-01-06 nvelope matiques au profit du projet et des CTAF. BJ-WACA -279372-GO-RFQ / Acquisition de matériels pour Single Stage - One E IDA / D4770 Project Management A posteriori Demande de prix Limited 10,000.00 7,786.75 Signé 2022-05-16 2022-08-03 2022-07-11 2022-08-07 2023-01-07 les groupes de reboisement ( nvelope Décamètre, cordon, jalons). BJ-WACA -322981-GO-RFQ / Acquisition des équipements Support to Forests Governan Single Stage - One E En cours d'ex IDA / D4770 A posteriori Demande de prix Limited 100,000.00 0.00 2022-11-28 2023-01-23 2023-07-22 individuels pour les équipes ce nvelope écution de patrouille SMART. BJ-WACA -353969-GO-RFQ / Acquisition de : (lot 1) Matéri els informatiques au profit de s CTAF, ONAB et UIGP, (lot 2 Single Stage - One E En cours d'ex IDA / D4770 Project Management A posteriori Appel d'offres Open - National 166,000.00 0.00 2023-05-31 2023-10-02 2023-06-05 2023-11-12 2023-07-17 2023-08-16 2023-09-20 2024-03-18 ) Consommables informatiqu nvelope écution es au profit de l'UIGP , (lot 3) Mettre en place d'un systèm e de vidéo conférence au pro fit de la DFEFC. BJ-WACA -354028-GO-RFQ / Acquisition de : (lot 1) Equipe ments de protection individu Single Stage - One E En cours d'ex IDA / D4770 Project Management A posteriori Appel d'offres Open - National 200,000.00 0.00 2023-06-20 2023-09-20 2023-06-25 2023-09-20 2023-08-06 2023-09-05 2023-10-10 2024-04-07 elle de lutte contre le feu au nvelope écution profit de l'UIGP , (lot 2 ) Maté riels pour les groupes de reb oisement. BJ-WACA -353993-GO-RFQ / Acquisition de : (lot 1) Fourni Single Stage - One E En cours d'ex tures de bureau au profit des IDA / D4770 Project Management A posteriori Demande de prix Limited 70,000.00 0.00 2023-07-05 2023-10-04 2023-08-30 2024-02-26 nvelope écution CTAF, ONAB et UIGP , (lot 2 ) Matériels et équipements de bureau au profit du projet. BJ-WACA -366295-GO-DIR / Acquisition de cent huit (108) motos cross et treize (13) vé Integrated Management of G Passation de marc Direct - Internation En cours d'ex IDA / D4770 A posteriori 360,000.00 0.00 2023-07-28 2023-06-30 2023-08-02 2023-09-18 2023-09-06 2024-03-04 hicules dont douze (12) pick- azetted Forests hé de gré à gré al écution up double cabine et un (01) S tation wagon au profit de l'UI GP. Page 4 BJ-WACA -395196-GO-RFQ / Single Stage - One E En attente d' Acquisition de deux (02) dron IDA / D4770 Project Management A posteriori Demande de prix Limited 100,000.00 0.00 2023-12-24 2024-02-18 2024-08-16 nvelope exécution es au profit du projet. NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -142560-NC-RFB / Gardiennage/surveillance da Integrated Management of G Single Stage - One E ns les six (06) forêts Classée IDA / D4770 A posteriori Appel d'offres Open - National 75,000.00 0.00 Annulé 2020-07-06 2020-07-11 2020-08-22 2020-09-21 2020-10-26 2021-04-24 azetted Forests nvelope s: Dan, Logozohè, Kétou, Oué mé boukou, Agoua et Tchaou rou-Toui-Kilibo. BJ-WACA -143599-CS-CDS / Élaborer et signet le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire azetted Forests hé de gré à gré (Forêt Classée de Kétou) BJ-WACA -143601-CS-CDS / Élaborer et signer le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire azetted Forests hé de gré à gré (Forêt Classée de Alibori Sup érieur Sud) BJ-WACA -143604-CS-CDS / Élaborer et signet le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire azetted Forests hé de gré à gré (Forêt Classée de Ouémé sup érieur) BJ-WACA -143600-CS-CDS / Élaborer et signet le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire azetted Forests hé de gré à gré (Forêt Classée de Logozohè). BJ-WACA -143605-CS-CDS / Élaborer et signer le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire azetted Forests hé de gré à gré (Forêt Classée de Trois Rivièr es) BJ-WACA -143301-CS-CDS / Élaborer et signer le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautair azetted Forests hé de gré à gré e (Forêt classée de Dan). BJ-WACA -143606-CS-CDS / Élaborer et signer le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire azetted Forests hé de gré à gré s (Forêt Classée de l'Alibori S upérieur Nord) BJ-WACA -143602-CS-CDS / Élaborer et signet le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire azetted Forests hé de gré à gré s (Forêt Classée de Agoua). BJ-WACA -143603-CS-CDS / Élaborer et signer le contrat Integrated Management of G Passation de marc avec la radio communautaire IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 azetted Forests hé de gré à gré (Forêt Classée de Tchaourou- Toui-Kilibo et Ouémé-Boukou ). BJ-WACA -143608-CS-CDS / Élaborer et signer le contrat Integrated Management of G Passation de marc IDA / D4770 A posteriori Direct 4,000.00 0.00 Annulé 2020-07-20 2020-07-25 2020-08-29 2021-02-25 avec la radio communautaire azetted Forests hé de gré à gré (Forêt Classée de Ouénou-Bé nou) BJ-WACA -162607-NC-RFQ / Recrutement d'un transitaire Support to Forests Governan Single Stage - One E pour l'enlèvement et l'immat IDA / D4770 A posteriori Demande de prix Limited 17,300.00 18,120.01 Signé 2020-05-25 2021-06-22 2020-07-20 2021-07-05 2021-01-16 ce nvelope riculation des matériels roula nts à acquérir par le biais de l'UNOPS. BJ-WACA -162778-NC-DIR / C ontractualiser avec un opérat Integrated Management of G Passation de marc eur GSM pour assurer le pay IDA / D4770 A posteriori Direct 9,000.00 15,027.01 Signé 2020-05-25 2020-04-02 2020-05-30 2020-04-16 2020-07-04 2021-06-28 2020-12-31 azetted Forests hé de gré à gré ement à bonne date des pres tations liées au reboisement/i ntensification agricole. BJ-WACA -166117-CS-CQS / Recrutement d'une agence d Integrated Management of G Single Stage - One E e communication pour mettr IDA / D4770 A posteriori Demande de prix Open 86,800.00 0.00 Annulé 2020-07-25 2020-09-19 2021-03-18 azetted Forests nvelope e en oeuvre la stratégie de c ommunication de l'UIGP. BJ-WACA -190908-NC-DIR / R ecrutement d'un transitaire p our l'enlèvement et l'immatri Support to Forests Governan Passation de marc IDA / D4770 A posteriori Direct 20,000.00 17,322.86 Signé 2020-09-07 2020-08-28 2020-09-12 2021-06-18 2020-10-17 2020-11-11 2021-04-15 culation de cent vingt-cinq (1 ce hé de gré à gré 25) motos cross et six (06) v éhicules acquis par le biais d e l'UNOPS. BJ-WACA -217655-CS-CDS / Elaborer et signer des conve Participation com ntions pour le gardiennage d Integrated Management of G munautaire à la p IDA / D4770 A posteriori Direct 112,000.00 0.00 Annulé 2021-12-20 2021-12-25 2022-01-29 2022-07-28 es plantations de 2020 et 20 azetted Forests assation des marc 21 avec des strutures de co- hés gestions au profit de l'UIGP e t de l'ONAB BJ-WACA -279379-CW-RFQ / Travaux de forage au niveau Single Stage - One E IDA / D4770 Project Management A posteriori Demande de prix Open - National 200,000.00 66,784.02 Signé 2022-07-04 2022-06-11 2022-08-29 2022-05-09 2023-02-25 des sites des bases vies prin nvelope cipales des CTAF. BJ-WACA -279387-CW-DIR / Elaborer et signer des conve ntions de gardiennage et de l Passation de marc En attente d' utte contre les feux des plant IDA / D4770 Project Management A posteriori Direct 3,600.00 0.00 2022-10-26 2022-10-31 2022-12-05 2023-06-03 hé de gré à gré exécution ations de 2020,2021 et 2022 avec des structures de coges tion au titre de 2021 au profi t de la forêt classée de Dan. Page 5 BJ-WACA -279381-CW-DIR / Elaborer et signer des conve Passation de marc En attente d' ntions de production de plant IDA / D4770 Project Management A posteriori Direct 24,000.00 0.00 2022-04-29 2022-05-04 2022-06-08 2022-12-05 hé de gré à gré exécution s avec des structures de cog estion au profit de la forêt cla ssée de Dan. BJ-WACA -279384-CW-DIR / Elaborer et signer des conve Passation de marc En cours d'ex ntions de reboisement avec IDA / D4770 Project Management A posteriori Direct 44,000.00 0.00 2022-06-30 2022-08-02 2022-07-05 2022-08-02 2022-08-09 2023-02-05 hé de gré à gré écution des structures de cogestion a u profit de la forêt classée de Dan. BJ-WACA -279386-CW-DIR / Elaborer et signer des conve ntions d'entretien et regarnis Passation de marc En attente d' IDA / D4770 Project Management A posteriori Direct 33,000.00 0.00 2022-11-29 2022-12-04 2023-01-08 2023-07-07 sage avec des structures de hé de gré à gré exécution cogestion au titre de 2021 au profit de la forêt classée de D an. BJ-WACA -288411-NC-DIR / E laborateur et signataire des c onventions de gardiennage e Integrated Management of G Passation de marc En attente d' t de lutte contre les feux des IDA / D4770 A posteriori Direct 4,500.00 0.00 2022-10-26 2022-10-31 2022-12-05 2023-06-03 azetted Forests hé de gré à gré exécution plantations de 2020,2021 et 2022 avec des structures de cogestion au titre de 2021 au profit de la forêt classée de L ogozohè. BJ-WACA -288518-NC-DIR / É laborateur et signataire des c onventions de gardiennage e t de lutte contre les feux des Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 29,000.00 0.00 2022-10-26 2022-10-31 2022-12-05 2023-06-03 plantations de 2020,2021 et azetted Forests hé de gré à gré exécution 2022 avec des structures de cogestion au titre de 2021 au profit de la forêt classée de O uémé-Boukou. BJ-WACA -288523-NC-DIR / É laborateur et signataire des c onventions de gardiennage e Integrated Management of G Passation de marc En attente d' t de lutte contre les feux des IDA / D4770 A posteriori Direct 30,000.00 0.00 2022-10-26 2022-10-31 2022-12-05 2023-06-03 azetted Forests hé de gré à gré exécution plantations de 2020,2021 et 2022 avec des structures de cogestion au titre de 2021 au profit de la forêt classée de A goua. BJ-WACA -288525-NC-DIR / É laborateur et signataire des c onventions de gardiennage e t de lutte contre les feux des Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 29,000.00 0.00 2022-10-26 2022-10-31 2022-12-05 2023-06-03 plantations de 2020,2021 et azetted Forests hé de gré à gré exécution 2022 avec des structures de cogestion au titre de 2021 au profit de la forêt classée de T chaourou-Toui-Kilibo (TTK). BJ-WACA -288530-NC-DIR / É laborateur et signataire des c onventions de gardiennage e Integrated Management of G Passation de marc En attente d' t de lutte contre les feux des IDA / D4770 A posteriori Direct 27,000.00 0.00 2022-10-26 2022-10-31 2022-12-05 2023-06-03 azetted Forests hé de gré à gré exécution plantations de 2020,2021 et 2022 avec des structures de cogestion au titre de 2021 au profit de la forêt classée de K étou. BJ-WACA -288535-NC-DIR / É laborateur et signataire des c onventions de gardiennage e Integrated Management of G Passation de marc En attente d' t de lutte contre les feux des IDA / D4770 A posteriori Direct 32,000.00 0.00 2022-10-26 2022-10-31 2022-12-05 2023-06-03 azetted Forests hé de gré à gré exécution plantations de 2020,2021 et 2022 avec des structures de cogestion au titre de 2021 au profit de la forêt classée de D ogo. BJ-WACA -288536-NC-DIR / É laborateur et signataire des c onventions de gardiennage e t de lutte contre les feux des Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 8,000.00 0.00 2022-10-26 2022-10-31 2022-12-05 2023-06-03 plantations de 2020,2021 et azetted Forests hé de gré à gré exécution 2022 avec des structures de cogestion au titre de 2021 au profit de la forêt classée de L ama-Sud. BJ-WACA -288541-NC-DIR / E laborer et signer des convent Integrated Management of G Passation de marc En cours d'ex ions de production de plants IDA / D4770 A posteriori Direct 29,000.00 0.00 2022-04-29 2022-08-02 2022-05-04 2022-08-02 2022-06-08 2022-12-05 azetted Forests hé de gré à gré écution avec des structures de coges tion au profit de la forêt class ée de Logozohè. BJ-WACA -288542-NC-DIR / E laborer et signer des convent Integrated Management of G Passation de marc En attente d' ions de production de plants IDA / D4770 A posteriori Direct 186,000.00 0.00 2022-04-29 2022-05-04 2022-06-08 2022-12-05 azetted Forests hé de gré à gré exécution avec des structures de coges tion au profit de la forêt class ée de Ouémé-Boukou. BJ-WACA -288544-NC-DIR / E laborer et signer des convent Integrated Management of G Passation de marc En attente d' ions de production de plants IDA / D4770 A posteriori Direct 197,000.00 0.00 2022-04-29 2022-05-04 2022-06-08 2022-12-05 azetted Forests hé de gré à gré exécution avec des structures de coges tion au profit de la forêt class ée de Agoua. BJ-WACA -288545-NC-DIR / E laborer et signer des convent ions de production de plants Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 186,000.00 0.00 2022-04-29 2022-05-04 2022-06-08 2022-12-05 avec des structures de coges azetted Forests hé de gré à gré exécution tion au profit de la forêt class ée de Tchaourou-Toui-Kilibo ( TTK). BJ-WACA -288546-NC-DIR / E laborer et signer des convent Integrated Management of G Passation de marc En attente d' ions de production de plants IDA / D4770 A posteriori Direct 18,000.00 0.00 2022-04-29 2022-05-04 2022-06-08 2022-12-05 azetted Forests hé de gré à gré exécution avec des structures de coges tion au profit de la forêt class ée de Kétou. BJ-WACA -288547-NC-DIR / E laborer et signer des convent Integrated Management of G Passation de marc En attente d' ions de production de plants IDA / D4770 A posteriori Direct 209,000.00 0.00 2022-04-29 2022-05-04 2022-06-08 2022-12-05 azetted Forests hé de gré à gré exécution avec des structures de coges tion au profit de la forêt class ée de Dogo. Page 6 BJ-WACA -288549-NC-DIR / E laborer et signer des convent Integrated Management of G Passation de marc En attente d' ions de production de plants IDA / D4770 A posteriori Direct 47,000.00 0.00 2022-04-29 2022-05-04 2022-06-08 2022-12-05 azetted Forests hé de gré à gré exécution avec des structures de coges tion au profit de la forêt class ée de Lama-Sud. BJ-WACA -288554-NC-DIR / É laborateur et signataire des c Integrated Management of G Passation de marc En attente d' onventions de reboisement a IDA / D4770 A posteriori Direct 55,000.00 0.00 2022-06-30 2022-07-05 2022-08-09 2023-02-05 azetted Forests hé de gré à gré exécution vec des structures de cogesti on au profit de la forêt classé e de Logozohè. BJ-WACA -288555-NC-DIR / É laborateur et signataire des c Integrated Management of G Passation de marc En attente d' onventions de reboisement a IDA / D4770 A posteriori Direct 349,000.00 0.00 2022-06-30 2022-07-05 2022-08-09 2023-02-05 azetted Forests hé de gré à gré exécution vec des structures de cogesti on au profit de la forêt classé e de Ouémé-Boukou. BJ-WACA -288557-NC-DIR / É laborateur et signataire des c Integrated Management of G Passation de marc En attente d' onventions de reboisement a IDA / D4770 A posteriori Direct 380,000.00 0.00 2022-06-30 2022-07-05 2022-08-09 2023-02-05 azetted Forests hé de gré à gré exécution vec des structures de cogesti on au profit de la forêt classé e de Agoua. BJ-WACA -288560-NC-DIR / É laborateur et signataire des c onventions de reboisement a Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 349,000.00 0.00 2022-06-30 2022-07-05 2022-08-09 2023-02-05 vec des structures de cogesti azetted Forests hé de gré à gré exécution on au profit de la forêt classé e de Tchaourou-Toui-Kilibo (T TK). BJ-WACA -288565-NC-DIR / É laborateur et signataire des c Integrated Management of G Passation de marc En attente d' onventions de reboisement a IDA / D4770 A posteriori Direct 328,000.00 0.00 2022-06-30 2022-07-05 2022-08-09 2023-02-05 azetted Forests hé de gré à gré exécution vec des structures de cogesti on au profit de la forêt classé e de Kétou. BJ-WACA -288566-NC-DIR / É laborateur et signataire des c Integrated Management of G Passation de marc En attente d' onventions de reboisement a IDA / D4770 A posteriori Direct 393,000.00 0.00 2022-06-30 2022-07-05 2022-08-09 2023-02-05 azetted Forests hé de gré à gré exécution vec des structures de cogesti on au profit de la forêt classé e de Dogo. BJ-WACA -288568-NC-DIR / É laborateur et signataire des c Integrated Management of G Passation de marc En attente d' onventions de reboisement a IDA / D4770 A posteriori Direct 88,000.00 0.00 2022-06-30 2022-07-05 2022-08-09 2023-02-05 azetted Forests hé de gré à gré exécution vec des structures de cogesti on au profit de la forêt classé e de Lama-Sud. BJ-WACA -288572-NC-DIR / E laborer et signer des convent ions d'entretien et regarnissa Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 41,000.00 0.00 2022-11-29 2022-12-04 2023-01-08 2023-07-07 ge avec des structures de co azetted Forests hé de gré à gré exécution gestion au titre de 2021 au p rofit de la forêt classée de Lo gozohè. BJ-WACA -288574-NC-DIR / E laborer et signer des convent ions d'entretien et regarnissa Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 261,000.00 0.00 2022-11-29 2022-12-04 2023-01-08 2023-07-07 ge avec des structures de co azetted Forests hé de gré à gré exécution gestion au titre de 2021 au p rofit de la forêt classée de Ou émé-Boukou. BJ-WACA -288576-NC-DIR / E laborer et signer des convent ions d'entretien et regarnissa Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 277,000.00 0.00 2022-11-29 2022-12-04 2023-01-08 2023-07-07 ge avec des structures de co azetted Forests hé de gré à gré exécution gestion au titre de 2021 au p rofit de la forêt classée de Ag oua. BJ-WACA -288580-NC-DIR / E laborer et signer des convent ions d'entretien et regarnissa Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 261,000.00 0.00 2022-11-29 2022-12-04 2023-01-08 2023-07-07 ge avec des structures de co azetted Forests hé de gré à gré exécution gestion au titre de 2021 au p rofit de la forêt classée de Tc haourou-Toui-Kilibo (TTK). BJ-WACA -288583-NC-DIR / E laborer et signer des convent ions d'entretien et regarnissa Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 244,000.00 0.00 2022-11-29 2022-12-04 2023-01-08 2023-07-07 ge avec des structures de co azetted Forests hé de gré à gré exécution gestion au titre de 2021 au p rofit de la forêt classée de Ké tou. BJ-WACA -288585-NC-DIR / E laborer et signer des convent ions d'entretien et regarnissa Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 293,000.00 0.00 2022-11-29 2022-12-04 2023-01-08 2023-07-07 ge avec des structures de co azetted Forests hé de gré à gré exécution gestion au titre de 2021 au p rofit de la forêt classée de Do go. BJ-WACA -288588-NC-DIR / E laborer et signer des convent ions d'entretien et regarnissa Integrated Management of G Passation de marc En attente d' IDA / D4770 A posteriori Direct 66,000.00 0.00 2022-11-29 2022-12-04 2023-01-08 2023-07-07 ge avec des structures de co azetted Forests hé de gré à gré exécution gestion au titre de 2021 au p rofit de la forêt classée de La ma-Sud. BJ-WACA -322961-NC-DIR / R ecrutement d'une Agence de Communication pour l'appui Single Stage - One E En cours d'ex IDA / D4770 Project Management A posteriori Demande de prix Limited 100,000.00 0.00 2022-12-09 2023-10-06 2023-02-03 2023-08-02 à la mise en œuvre de la stra nvelope écution tégie et plans de communica tion de l'Unité Intégrée de ge stion des projets (UIGP). BJ-WACA -322979-NC-RFQ / Travaux de treize (13) forage s d’eau potable dans les bas Integrated Management of G Single Stage - One E En attente d' IDA / D4770 A posteriori Appel d'offres Open - National 200,000.00 0.00 2023-03-30 2023-04-04 2023-05-16 2023-06-15 2023-07-20 2024-01-16 es vies secondaires et des po azetted Forests nvelope exécution stes avancés des Cellules Te chniques d’Aménagement Fo restier (CTAF). CONSULTING FIRMS Page 7 Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -142475-CS-CQS / Etude socio-économique des villages riverains des forêts c Sélection fondée s Development of Selected NT lassées ciblées: Kétou, Dan, IDA / D4770 A posteriori ur les qualification Open - National 80,000.00 0.00 Annulé 2020-04-13 2020-05-04 2020-06-17 2020-07-17 2020-08-21 2021-02-17 FP Value Chains Logozohè, Ouémé-boukou, A s des consultants goua, Tchaourou-Toui-Kilibo, trois rivières, alibori supérieu r et Ouénou Bénou. BJ-WACA -143202-CS-CQS / Recrutement d'un cabinet po Sélection fondée s Integrated Management of G ur réaliser l'état des lieux de IDA / D4770 A posteriori ur les qualification Limited 197,574.00 0.00 Annulé 2020-05-28 2020-06-11 2020-07-11 2020-08-15 2021-02-11 azetted Forests l'occupation des 10 forêts cla s des consultants ssées sous gestion du projet. BJ-WACA -143206-CS-CQS / Recrutement d'un cabinet po ur réaliser l'étude d'inventair Sélection fondée s e (faune et flore) pour établir Integrated Management of G IDA / D4770 A posteriori ur les qualification Limited 60,000.00 0.00 Annulé 2020-05-25 2020-06-08 2020-07-08 2020-08-12 2021-02-08 la situation de référence de l azetted Forests s des consultants a biodiversité dans les six (0 6) forêts classées:Kétou, Dan , Logozolè, Ouémé-Boukou, A goua, Tchaourou-Toui-Kilibo. BJ-WACA -143218-CS-CQS / Sélection fondée s Recrutement d'un cabinet p Integrated Management of G IDA / D4770 A posteriori ur les qualification Limited 70,000.00 0.00 Annulé 2020-05-25 2020-06-08 2020-07-08 2020-08-12 2021-02-08 our réaliser l'étude de sol des azetted Forests s des consultants séries de production des 10 f orêts classées. BJ-WACA -143219-CS-CQS / Sélection fondée s Recrutement d'un cabinet po IDA / D4770 Project Management A posteriori ur les qualification Limited 75,000.00 0.00 Annulé 2020-05-18 2020-06-01 2020-07-01 2020-08-05 2021-02-01 ur évaluer le potentiel en noi s des consultants x de karité autour et dans les forêts classées. BJ-WACA -143223-CS-CQS / Sélection fondée s Recrutement d'un cabinet p IDA / D4770 Project Management A posteriori ur les qualification Limited 22,000.00 0.00 Annulé 2020-06-22 2020-07-06 2020-08-05 2020-09-09 2021-03-08 our analyser les chaînes de v s des consultants aleurs porteuses et du march é de karité. BJ-WACA -143230-CS-CQS / Sélection fondée s Recrutement d'un cabinet po IDA / D4770 Project Management A posteriori ur les qualification Limited 22,000.00 0.00 Annulé 2020-06-22 2020-07-06 2020-08-05 2020-09-09 2021-03-08 ur analyser les chaînes de v s des consultants aleurs porteuses et du march é du miel. BJ-WACA -143288-CS-CQS / Recrutement d'un cabinet po ur réaliser le zonage, délimit Sélection fondée s Development of Selected NT er les différentes séries et ré IDA / D4770 A posteriori ur les qualification Limited 50,000.00 0.00 Annulé 2020-05-18 2020-06-01 2020-07-01 2020-08-05 2021-02-01 FP Value Chains diger les plans d'aménageme s des consultants nt des forêts calssées : Alibor i Supérieue,Trois Rivières et Ouénon Bénou. BJ-WACA -143290-CS-CQS / Recrutement d'un cabinet po Sélection fondée s ur réaliser les études techniq Development of Selected NT IDA / D4770 A posteriori ur les qualification Limited 80,000.00 236,922.76 Signé 2020-05-25 2021-06-25 2020-06-08 2021-06-28 2020-07-08 2021-06-28 2020-08-12 2021-07-01 2021-02-08 ues, contrôle et supervision d FP Value Chains s des consultants es travaux de réhabilitation/c onstruction des bases vie des 10 CTAF. BJ-WACA -143291-CS-CQS / Recrutement d'un cabinet po Sélection fondée s ur analyser et proposer les o Development of Selected NT IDA / D4770 A posteriori ur les qualification Limited 62,500.00 0.00 Annulé 2020-06-08 2020-06-22 2020-07-22 2020-08-26 2021-02-22 ptions efficaces de gestion d FP Value Chains s des consultants urable des forêts classées da ns la sous région et à l'intern ational. BJ-WACA -143294-CS-CQS / Recrutmt d'un cabinet pr réal iser l'étude pr l'identification au niveau national de systèm Sélection fondée s Integrated Management of G e d'agrofesterie et d'intensifi IDA / D4770 A posteriori ur les qualification Limited 26,000.00 0.00 Annulé 2020-06-08 2020-06-22 2020-07-22 2020-08-26 2021-02-22 azetted Forests cation agricoles adaptés aux s des consultants zones agroécologiques autou r des 10 forêts classées et du mécanisme de durabilité de l eur mise en oeuvre. BJ-WACA -143297-CS-CQS / Recrutement d'une ONG à m Sélection fondée s andater pour l'encadrement Integrated Management of G En cours d'exécut IDA / D4770 A posteriori ur les qualification Limited 24,000.00 0.00 2020-07-20 2021-11-03 2020-08-03 2022-06-11 2020-09-02 2020-10-07 2021-04-05 des agriculteurs des forêts cl azetted Forests ion s des consultants assées: Alibori Supérieue,Troi s Rivières et Ouénou Bénou. BJ-WACA -143303-CS-CQS / Sélection fondée s Recrutement d'un cabinet po Integrated Management of G IDA / D4770 A posteriori ur les qualification Limited 40,000.00 0.00 Annulé 2020-07-06 2020-07-20 2020-08-19 2020-09-23 2021-03-22 ur identifier les technologies azetted Forests s des consultants efficace de carbonisation. BJ-WACA -143304-CS-CQS / Sélection fondée s Recrutement d'un cabinet po IDA / D4770 Project Management A posteriori ur les qualification Limited 50,000.00 0.00 Annulé 2020-07-13 2020-07-27 2020-08-26 2020-09-30 2021-03-29 ur élaborer la stratégie d'inst s des consultants allation des plantations de ka rité. BJ-WACA -143577-CS-CQS / Recrutement d'un cabinet po ur réaliser le zonage, délimit Sélection fondée s Development of Selected NT er les différentes séries et ré IDA / D4770 A posteriori ur les qualification Limited 50,000.00 0.00 Annulé 2020-05-18 2020-06-01 2020-07-01 2020-08-05 2021-02-01 FP Value Chains diger les plans d'aménageme s des consultants nt des forêts calssées: Ouém é Spérieur, Agoua et Tchaour ou-Toui-Kilibo BJ-WACA -143588-CS-CQS / Recrutement d'un cabinet po ur réaliser le zonage, délimit Sélection fondée s Development of Selected NT er les différentes séries et ré IDA / D4770 A posteriori ur les qualification Limited 50,000.00 0.00 Annulé 2020-05-18 2020-06-01 2020-07-01 2020-08-05 2021-02-01 FP Value Chains diger les plans d'aménageme s des consultants nt des forêts calssées: Kétou, Dan, logozohè et Ouémé-bou kou. Page 8 BJ-WACA -143594-CS-CQS / Recrutement d'une ONG à m Sélection fondée s andater pour l'encadrement Integrated Management of G En cours d'exécut IDA / D4770 A posteriori ur les qualification Limited 23,000.00 0.00 2020-07-20 2021-11-03 2020-08-03 2022-06-11 2020-09-02 2020-10-07 2021-04-05 des agriculteurs des forêts cl azetted Forests ion s des consultants assées: Ouémé Spérieur, Ago ua et Tchaourou-Toui-Kilibo. BJ-WACA -143595-CS-CQS / Recrutement d'une ONG à m Sélection fondée s Integrated Management of G En cours d'exécut andater pour l'encadrement IDA / D4770 A posteriori ur les qualification Limited 23,000.00 0.00 2020-07-20 2021-11-03 2020-08-03 2022-06-11 2020-09-02 2020-10-07 2021-04-05 azetted Forests ion des agriculteurs des forêts cl s des consultants assées: Kétou, Dan, logozohè et Ouémé-boukou. BJ-WACA -143731-CS-CQS / Recrutement d'un cabinet po ur réaliser l'étude d'impact e Sélection fondée s nvironnemental et social et l Integrated Management of G IDA / D4770 A posteriori ur les qualification Limited 200,000.00 0.00 Annulé 2020-08-24 2020-09-07 2020-10-07 2020-11-11 2021-05-10 e plan d'action et de réinstall azetted Forests s des consultants ation pour les activités du pr ojet (Reboisement, intensific ation agricole et agroferester ie, transhumance) BJ-WACA -144172-CS-LCS / R ecrutement d'un cabinet pou Support to Forests Governan Sélection au moin En cours d'exécut IDA / D4770 A posteriori Open - National 10,000.00 0.00 2020-04-13 2022-04-08 2020-05-04 2020-06-17 2020-07-15 2020-08-14 2020-09-18 2020-10-23 2021-04-21 r réaliser l'audit annuel du pr ce dre coût ion ojet exercice 2020. BJ-WACA -143300-CS-INDV / Recrutement d'une Agence d e Communication pour élabo Sélection fondée s Integrated Management of G rer la stratégie de communic IDA / D4770 A posteriori ur les qualification Open - National 36,000.00 74,953.08 Signé 2020-03-23 2020-04-29 2020-04-13 2020-06-30 2020-05-27 2021-06-25 2020-06-26 2021-06-25 2020-07-31 2021-07-06 2021-01-27 azetted Forests ation sur l'aménagement inté s des consultants gré et durable des forêts clas sées et assister l'UIGP à sa m ise en oeuvre. BJ-WACA -156905-CS-CQS / Recrutement d'un cabinet po Sélection fondée s ur réaliser l'état des lieux de Integrated Management of G IDA / D4770 A posteriori ur les qualification Limited 90,000.00 111,730.33 Signé 2020-04-20 2021-06-24 2020-05-04 2021-06-30 2020-06-03 2021-06-30 2020-07-08 2021-07-13 2021-01-04 s occupations dans les forêts azetted Forests s des consultants classées ciblées de : Dogo-Ké tou, Trois Rivières et ouénou Bénou. BJ-WACA -156907-CS-CQS / Recrutement d'un cabinet po Sélection fondée s ur réaliser l'état des lieux de Integrated Management of G IDA / D4770 A posteriori ur les qualification Limited 90,000.00 118,274.54 Signé 2020-04-20 2021-06-24 2020-05-04 2021-06-30 2020-06-03 2021-06-30 2020-07-08 2021-07-13 2021-01-04 s occupations dans les forêts azetted Forests s des consultants classées ciblées de: Alibori S upérieur, Dan et Ouémé Bou kou. BJ-WACA -156912-CS-CQS / Recrutement d'un cabinet po Sélection fondée s ur réalier l'état des lieux des Integrated Management of G IDA / D4770 A posteriori ur les qualification Limited 98,500.00 123,737.33 Signé 2020-04-20 2021-06-24 2020-05-04 2021-06-30 2020-06-03 2021-06-30 2020-07-08 2021-07-13 2021-01-04 occupations dans les forêts cl azetted Forests s des consultants assées ciblées de : Ouémé S upérieur-Ndali, Tchaourou To ui-Kilibo, Agoua et Logozohè. BJ-WACA -160186-CS-CQS / Recrutement d'un cabinet po ur actualisation du zonage,m Sélection fondée s Development of Selected NT atérialisation des séries et ré IDA / D4770 A posteriori ur les qualification Limited 72,300.00 140,290.52 Signé 2020-05-25 2020-04-03 2020-06-08 2021-06-23 2020-07-08 2021-06-23 2020-08-12 2021-06-29 2021-02-08 FP Value Chains vision des plans d'aménage s des consultants ment des forêts classées d'Al iborie Supérieur, Dan, Ouém é-Boukou. BJ-WACA -160187-CS-CQS / Recrutement d'un cabinet po ur actualisation du zonage,m Sélection fondée s Development of Selected NT atérialisation des séries et ré IDA / D4770 A posteriori ur les qualification Limited 72,300.00 150,305.63 Signé 2020-05-25 2020-04-03 2020-06-08 2021-06-23 2020-07-08 2021-06-23 2020-08-12 2021-06-29 2021-02-08 FP Value Chains vision des plans d'aménage s des consultants ment des forêts classées de Kétou, Trois Rivières et Ouén ou Bénou. BJ-WACA -160188-CS-CQS / Recrutement d'un cabinet po ur actualisation du zonage,m Sélection fondée s Development of Selected NT atérialisation des séries et ré IDA / D4770 A posteriori ur les qualification Limited 72,300.00 140,745.75 Signé 2020-05-25 2020-04-03 2020-06-08 2021-06-23 2020-07-08 2021-06-23 2020-08-12 2021-06-29 2021-02-08 FP Value Chains vision des plans d'aménage s des consultants ment des forêts classées de Ouémé Supérieur-Ndali, Tcha ourou Toui-Kilibo et Logozoh è. BJ-WACA -160191-CS-CQS / Recrutement d'un cabinet p our réaliser l'étude socio éco Sélection fondée s Development of Selected NT nomique des villages riverain IDA / D4770 A posteriori ur les qualification Limited 70,000.00 65,229.23 Signé 2020-05-11 2020-04-02 2020-05-25 2021-06-25 2020-06-24 2021-06-25 2020-07-29 2021-07-08 2021-01-25 FP Value Chains s des forêts classées ciblées s des consultants de Dan, Ouémé Boukou, Dog o-Kétou, Tchaourou Toui-kilib o,Agoua et logozohè. BJ-WACA -160192-CS-CQS / Recrutement d'un cabinet po ur réaliser l'étude socio écon Sélection fondée s Development of Selected NT omique des villages riverains IDA / D4770 A posteriori ur les qualification Limited 70,000.00 67,715.08 Signé 2020-05-11 2020-04-02 2020-05-25 2021-06-25 2020-06-24 2021-06-25 2020-07-29 2021-07-08 2021-01-25 FP Value Chains des forêts classées ciblées d s des consultants e Trois Rivières, Ouénou Bén ou, Ouémé Supérieur-Ndali e t Aliborie Supérieur. BJ-WACA -162789-CS-CQS / Recrutement d'un cabinet d' audit pour la vérification du p Integrated Management of G Sélection au moin En cours d'exame IDA / D4770 A posteriori Open - National 69,500.00 0.00 2020-05-25 2020-05-05 2020-06-15 2020-07-29 2020-08-26 2020-09-25 2020-10-30 2020-12-04 2021-06-02 rocessus de payement et l'eff azetted Forests dre coût n ectivité de la réalisation des t ravaux de reboisement/inten sification. BJ-WACA -178742-CS-CQS / Recrutement d'un cabinet d' Sélection fondée s audit pour la vérification du p IDA / D4770 Project Management A posteriori ur les qualification Open - National 69,500.00 0.00 Annulé 2020-06-30 2020-07-21 2020-09-03 2020-10-03 2020-11-07 2021-05-06 rocessus de payement et l'eff s des consultants ectivité de la réalisation des t ravaux de reboisement/inten sification. BJ-WACA -190907-CS-CQS / Recrutement d'un consultant Sélection fondée s pour l'étude de prospection h Integrated Management of G IDA / D4770 A posteriori ur les qualification Limited 20,000.00 14,670.32 Signé 2020-11-23 2020-10-21 2020-12-07 2021-06-25 2021-01-06 2021-06-25 2021-02-10 2021-06-29 2021-08-09 ydrogéologique en vue de dé azetted Forests s des consultants tecter la présence d'eau au n iveau des bases vie des CTAF . Page 9 BJ-WACA -203699-CS-CQS / Recrutement d’un cabinet/Bu reau d’étude pour évaluatio Sélection fondée s n sociale et l’élaboration de P Integrated Management of G En cours d'exame IDA / D4770 A posteriori ur les qualification Open - National 98,000.00 0.00 2020-12-14 2021-06-24 2021-01-04 2021-02-17 2021-03-19 2021-04-23 2021-10-20 lans d’Action de Réinstallatio azetted Forests n s des consultants n (PAR) dans le cadre des tra vaux d’aménagement des for êts classées de Dogo-Kétou, Ouénou-Bénou et Trois Rivièr es. BJ-WACA -203700-CS-CQS / Recrutement d’un cabinet/Bu reau d’étude pour évaluatio n sociale et l’élaboration de P Sélection fondée s Integrated Management of G En cours d'exame lans d’Action de Réinstallatio IDA / D4770 A posteriori ur les qualification Open - National 98,000.00 0.00 2020-12-14 2021-06-24 2021-01-04 2021-02-17 2021-03-19 2021-04-23 2021-10-20 azetted Forests n n (PAR) dans le cadre des tra s des consultants vaux d’aménagement des for êts classées de Agoua, Logoz ohè, Ouémé Supérier-N’Dali, et Tchaourou Toui Kilibo. BJ-WACA -203701-CS-CQS / Recrutement d’un cabinet/Bu reau d’étude pour évaluatio n sociale et l’élaboration de P Sélection fondée s Integrated Management of G En cours d'exame lans d’Action de Réinstallatio IDA / D4770 A posteriori ur les qualification Open - National 98,000.00 0.00 2020-12-14 2021-06-24 2021-01-04 2021-02-17 2021-03-19 2021-04-23 2021-10-20 azetted Forests n n (PAR) dans le cadre des tra s des consultants vaux d’aménagement des for êts classées de Aliborie Supé rieur, Dan, Ouémé-Boukou et Toffo-Lama sud. BJ-WACA -203770-CS-CQS / Recrutement d’un cabinet/Bu reau d’étude pour réaliser l’E Sélection fondée s tude d’Impact Environnemen Integrated Management of G IDA / D4770 A posteriori ur les qualification Open - National 98,000.00 120,722.04 Signé 2020-12-21 2021-03-24 2021-01-11 2021-04-12 2021-02-24 2021-10-08 2021-03-26 2022-04-18 2021-04-30 2022-02-27 2021-10-27 tale et Sociale (EIES) dans le azetted Forests s des consultants cadre des travaux d’aménag ement des forêts classées de Alibori Supérieur, Ouémé-Bo ukou, Lama Sud et Dan. BJ-WACA -203771-CS-CQS / Recrutement d’un cabinet/Bu reau d’étude pour réaliser l’E Sélection fondée s tude d’Impact Environnemen Integrated Management of G IDA / D4770 A posteriori ur les qualification Open - National 98,000.00 120,627.53 Signé 2020-12-21 2021-03-24 2021-01-11 2021-04-12 2021-02-24 2021-10-08 2021-03-26 2022-04-18 2021-04-30 2022-03-04 2021-10-27 tale et Sociale (EIES) dans le azetted Forests s des consultants cadre des travaux d’aménag ement des forêts classées de Dogo-Kétou, Ouémé-Bénou e t Trois Rivières. BJ-WACA -203773-CS-CQS / Recrutement d’un cabinet/Bu reau d’étude pour réaliser l’E Sélection fondée s tude d’Impact Environnemen Integrated Management of G IDA / D4770 A posteriori ur les qualification Open - National 98,000.00 120,578.14 Signé 2020-12-21 2021-03-24 2021-01-11 2021-04-12 2021-02-24 2021-10-08 2021-03-26 2022-04-18 2021-04-30 2022-03-04 2021-10-27 tale et Sociale (EIES) dans le azetted Forests s des consultants cadre des travaux d’aménag ement des forêts classées de Ouémé Supérieur N’Dali, Tch aourou Toui Kilibo, Agoua et Logozohè. BJ-WACA -217614-CS-CQS / Recrutement d'un cabinet po Sélection fondée s ur réaliser l'étude de prospec Integrated Management of G IDA / D4770 A posteriori ur les qualification Open - National 20,000.00 15,279.18 Signé 2021-08-24 2021-06-21 2021-09-14 2022-04-22 2021-10-28 2022-08-02 2021-11-27 2022-08-02 2022-01-01 2022-01-12 2022-06-30 tion hydrologique au niveau azetted Forests s des consultants des périmètres des base vies secondaires et des postes av ancées des CTAF. BJ-WACA -217625-CS-CQS / Sélection fondée s Recrutement d'un cabinet po En cours d'exécut IDA / D4770 Project Management A posteriori ur les qualification Open - National 50,000.00 0.00 2021-08-17 2022-08-16 2021-09-07 2021-10-21 2021-11-20 2021-12-25 2022-06-23 ur organiser l'occupation des ion s des consultants séries agricoles dans les dix f orêts classées. BJ-WACA -217636-CS-CQS / Recrutement d'un cabinet po ur analyser et proposer les o Sélection fondée s Integrated Management of G En cours d'exécut ptions d'arrangement institut IDA / D4770 A posteriori ur les qualification Open - National 84,000.00 0.00 2021-04-23 2022-06-09 2021-05-14 2022-07-12 2021-06-27 2021-07-27 2021-08-31 2022-02-27 azetted Forests ion ionnel efficaces de gestion d s des consultants urable des forêts classées da ns la sous régio et à l'interna tional. BJ-WACA -217632-CS-CQS / Recrutement d'un cabinet po ur réaliser l'étude pour l'iden Sélection fondée s Integrated Management of G tification au niveau national IDA / D4770 A posteriori ur les qualification Open - National 32,000.00 0.00 Annulé 2021-09-27 2021-10-18 2021-12-01 2021-12-31 2022-02-04 2022-08-03 azetted Forests de système d'agroforesterie s des consultants et d'intensification agricoles adaptés aux zones agroécolo giques autour des 10 forêts c lassées. BJ-WACA -232697-CS-QCBS / Recrutement d'un cabinet/Bu Sélection fondée s Integrated Management of G Open - Internationa reau d'étude pour la réalisati IDA / D4770 A posteriori ur la qualité et le 300,000.00 275,600.50 Signé 2021-06-14 2021-05-27 2021-07-05 2021-06-28 2021-08-18 2021-10-08 2021-09-15 2022-04-18 2021-10-15 2022-04-18 2021-11-19 2022-04-18 2021-12-24 2022-03-24 2022-12-24 azetted Forests l on de l'inventaire forestier da coût ns les forêts classées BJ-WACA -232700-CS-QCBS / Recrutement d'un cabinet/Bu Sélection fondée s Integrated Management of G Open - Internationa reau d'étude pour la réalisati IDA / D4770 A posteriori ur la qualité et le 180,000.00 113,777.03 Signé 2021-06-14 2021-05-27 2021-07-05 2021-06-14 2021-08-18 2021-10-08 2021-09-15 2022-04-18 2021-10-15 2022-04-18 2021-11-19 2022-04-18 2021-12-24 2022-04-07 2022-12-24 azetted Forests l on du dénombrement de la f coût aune dans les forêts classées . BJ-WACA -234568-CS-QCBS / Recrutement d'une firme pou Sélection fondée s r appui au développement du Integrated Management of G Open - Internationa En cours d'exécut IDA / D4770 A posteriori ur la qualité et le 500,000.00 0.00 2021-08-27 2021-06-23 2021-09-17 2021-07-16 2021-10-31 2022-08-02 2021-11-28 2022-08-02 2021-12-28 2022-08-02 2022-02-01 2022-08-02 2022-03-08 2023-03-08 système agroforesterie dans azetted Forests l ion coût les forêts classées dans la zo ne d'intervention du projet. BJ-WACA -234841-CS-CQS / Sélection fondée s Recrutement d'un auditeur in En cours d'exécut IDA / D4770 Project Management A posteriori ur les qualification Open - National 30,000.00 0.00 2021-07-20 2021-06-04 2021-08-10 2021-07-26 2021-09-23 2021-10-23 2021-11-27 2022-05-26 terne des comptes des projet ion s des consultants s de l'Unité Intégrée de Gesti on des Projets (UIGP). BJ-WACA -279166-CS-CQS / Sélection fondée s Recrutement d'un consultant Development of Selected NT En cours d'exécut IDA / D4770 A posteriori ur les qualification Open - National 40,000.00 0.00 2022-09-12 2022-06-09 2022-10-03 2022-07-06 2022-11-16 2022-12-16 2023-01-20 2023-07-19 pour réaliser l'analyse des ch FP Value Chains ion s des consultants aîne de valeur porteuses et d u marchés du miel. BJ-WACA -279178-CS-CQS / Recrutement d'un consultant Sélection fondée s Integrated Management of G individuel pour établir la situ IDA / D4770 A posteriori ur les qualification Open - National 30,000.00 0.00 Annulé 2022-09-28 2022-10-19 2022-12-02 2023-01-01 2023-02-05 2023-08-04 azetted Forests ation de référence du stock c s des consultants arbone au niveau des forêts classées. Page 10 BJ-WACA -325951-CS-CQS / Réaliser la prospection hydro Sélection fondée s Integrated Management of G En cours d'exécut géologique pour les forages IDA / D4770 A posteriori ur les qualification Open - National 100,000.00 0.00 2022-12-06 2023-08-23 2022-12-27 2023-09-19 2023-02-09 2023-03-11 2023-04-15 2023-10-12 azetted Forests ion à but d'approvisionnement e s des consultants n eau des pépinières en forêt . BJ-WACA -354483-CS-CQS / Recrutement d'un consultant Sélection fondée s individuel pour réaliser les ét Integrated Management of G En attente d'exéc IDA / D4770 A posteriori ur les qualification Open - National 100,000.00 0.00 2023-07-20 2023-08-10 2023-09-23 2023-10-23 2023-11-27 2024-05-25 udes techniques des pistes e azetted Forests ution s des consultants t ouvrages de franchissemen t pour l'accès aux parcelles d e 2023. BJ-WACA -354490-CS-CQS / Recrutement d'un consultant individuel pour évaluer le pot entiel de production de noix Sélection fondée s Development of Selected NT En attente d'exéc de Karité exploitable dans et IDA / D4770 A posteriori ur les qualification Open - National 60,000.00 0.00 2023-08-23 2023-09-13 2023-10-27 2023-11-26 2023-12-31 2024-06-28 FP Value Chains ution autour des forêts classées d s des consultants e: Agoua, TTK, Ouémé Bouko u, Ouénou Benou, Trois Riviè res, Ouémé Supérieur et N'd ali et Alibori Supérieur. BJ-WACA -354495-CS-CQS / Recrutement d'un consultant Sélection fondée s individuel pour faire un inven Development of Selected NT En attente d'exéc IDA / D4770 A posteriori ur les qualification Open - National 20,000.00 0.00 2023-09-20 2023-10-11 2023-11-24 2023-12-24 2024-01-28 2024-07-26 taire analytique des techniqu FP Value Chains ution s des consultants es de reproduction à grande échelle du karité au Bénin et dans la sous région. BJ-WACA -354499-CS-CQS / Sélection fondée s Recrutement d'un cabinet po Development of Selected NT En cours d'exame IDA / D4770 A posteriori ur les qualification Open - National 70,000.00 0.00 2023-08-29 2023-09-20 2023-09-19 2023-11-02 2023-12-02 2024-01-06 2024-07-04 ur faire l'analyse des chaînes FP Value Chains n s des consultants de valeur porteuses et du ma rché de karité. BJ-WACA -354507-CS-CQS / Recrutement d'un consultant Sélection fondée s Integrated Management of G En attente d'exéc individuel organiser l'audit à IDA / D4770 A posteriori ur les qualification Open - National 20,000.00 0.00 2023-09-12 2023-10-03 2023-11-16 2023-12-16 2024-01-20 2024-07-18 azetted Forests ution mi-parcours de la performan s des consultants ce environnementale et socia le (CGES). BJ-WACA -354511-CS-CQS / Recrutement d'un consultant Sélection fondée s Integrated Management of G En attente d'exéc individuel pour évaluer la co IDA / D4770 A posteriori ur les qualification Open - National 20,000.00 0.00 2023-10-26 2023-11-16 2023-12-30 2024-01-29 2024-03-04 2024-08-31 azetted Forests ution ntribution du projet à l'améli s des consultants oration des conditions de vie des ménages riverains. BJ-WACA -354489-CS-CQS / Recrutement d'un cabinet po Sélection fondée s Integrated Management of G En attente d'exéc ur réaliser les études techniq IDA / D4770 A posteriori ur les qualification Limited 6,000.00 0.00 2023-08-23 2023-09-06 2023-10-06 2023-11-10 2024-05-08 azetted Forests ution ues pour l'identification du si s des consultants te de forage du secteur de D ogo dans le cadre du PFCB. INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -142480-CS-INDV / Elaborer les outils et méthod Development of Selected NT IDA / D4770 A posteriori Individuel Limited 10,000.00 0.00 Annulé 2020-05-18 2020-07-06 2020-07-27 2020-08-31 2021-02-27 es de suivi et d'évaluation de FP Value Chains la performance des agents fo restiers du Projet. BJ-WACA -143198-CS-INDV / Recrutement d'un consultant individuel pour l'étude d'anal Development of Selected NT yse des opportunités et contr IDA / D4770 A posteriori Individuel Limited 17,500.00 0.00 Annulé 2020-06-23 2020-06-28 2020-07-19 2020-08-23 2021-02-19 FP Value Chains aintes inhérentes à l'arrange ment institutionnel en place pour la gestion des forêts cla ssées. BJ-WACA -143208-CS-INDV / Recrutement d'un consultant Integrated Management of G IDA / D4770 A posteriori Individuel Limited 17,500.00 0.00 Annulé 2020-06-29 2020-07-04 2020-07-25 2020-08-29 2021-02-25 individuel pour évaluer et réo azetted Forests rganiser les Marchés Ruraux de Bois. BJ-WACA -143231-CS-INDV / Recrutement d'un consultant individuel pour évaluer le fon ctionnement du FNDF et autr Development of Selected NT IDA / D4770 A posteriori Individuel Limited 17,500.00 0.00 Annulé 2020-05-11 2020-05-16 2020-06-06 2020-07-11 2021-01-07 e Fonds (FSOA) dédiés aux ai FP Value Chains res protégées pour examine r les possibilités d'ouverture d'un guichet spécifique aux f orêts classées. BJ-WACA -143236-CS-INDV / Recrutement d'un consultant individuel pour réaliser l'inve IDA / D4770 Project Management A posteriori Individuel Limited 17,500.00 0.00 Annulé 2020-04-20 2020-04-25 2020-05-16 2020-06-20 2020-12-17 ntaire analytique des techniq ues de reproduction grandeu r nature du karité au Bénin et dans la sous région. BJ-WACA -143265-CS-INDV / Recrutement d'un consultan t individuel pour réaliser l'éta t des lieux des individus, gro En attente d'exéc IDA / D4770 Project Management A posteriori Individuel Limited 16,500.00 0.00 2020-05-25 2020-05-30 2020-06-20 2020-07-25 2021-01-21 upements et structures privé ution es engagés dans l'apiculture, le commerce du miel dans le s villages riverains des forêts classées. BJ-WACA -143269-CS-INDV / Recrutement d'un consultant individuel pour réaliser l'état des lieux des individus, grou IDA / D4770 Project Management A posteriori Individuel Limited 17,500.00 0.00 Annulé 2020-06-15 2020-06-20 2020-07-11 2020-08-15 2021-02-11 pements et structures privée s engagés dans la transform ation de noix de karité dans l es villages riveraines des for êts classées. BJ-WACA -143278-CS-INDV / Recrutement d'un consultant individuel pour élaborer le m IDA / D4770 Project Management A posteriori Individuel Limited 16,000.00 0.00 Annulé 2020-04-20 2020-04-25 2020-05-16 2020-06-20 2020-12-17 anuel de développement de l a chaîne de valeur de karité. Page 11 BJ-WACA -143283-CS-INDV / Recrutement d'un consultant IDA / D4770 Project Management A posteriori Individuel Limited 16,000.00 0.00 Annulé 2020-04-20 2020-04-25 2020-05-16 2020-06-20 2020-12-17 individuel pour élaborer le m anuel de développement de l a filière miel. BJ-WACA -143285-CS-CDS / Élaborer et signer une conve Sélection de cons ntion avec le Centre Internati Integrated Management of G IDA / D4770 A posteriori ultants par entent Direct 50,000.00 0.00 Annulé 2020-06-08 2020-06-18 2020-08-22 2021-02-18 onal de Recherche en Agrofo azetted Forests e directe resterie pour l'identification d es techniques d'agroforesteri e. BJ-WACA -145210-CS-INDV / Recrutement d'un Assistant T Support to Forests Governan IDA / D4770 A posteriori Individuel Open 144,000.00 430,554.24 Signé 2020-01-20 2019-11-12 2020-03-09 2021-06-24 2020-03-30 2021-06-24 2020-05-04 2020-03-25 2020-10-31 echnique International (ATI) ce au profit de l'UIGP. BJ-WACA -145213-CS-INDV / Support to Forests Governan En attente d'exéc Recrutement d'un Chargé Sui IDA / D4770 A posteriori Individuel Open 14,400.00 0.00 2020-03-30 2020-05-18 2020-06-08 2020-07-13 2021-01-09 ce ution vi-Evaluation au profit du pro jet. BJ-WACA -145235-CS-INDV / Support to Forests Governan En cours d'exécut Recrutement d'un comptable IDA / D4770 A posteriori Individuel Open 14,400.00 0.00 2020-03-30 2019-12-20 2020-05-18 2021-10-08 2020-06-08 2020-07-13 2021-01-09 ce ion au profit du projet. BJ-WACA -166115-CS-INDV / Recrutement d'un consultant Integrated Management of G IDA / D4770 A posteriori Individuel Limited 34,700.00 0.00 Annulé 2020-06-15 2020-06-20 2020-07-11 2020-08-15 2021-02-11 individuel pour élaborer la str azetted Forests atégie de communication de l'UIGP. BJ-WACA -178745-CS-CDS / Sélection de cons Recrutement d'un consultant IDA / D4770 Project Management A posteriori ultants par entent Direct 180,000.00 192,108.12 Signé 2020-07-30 2020-06-30 2020-08-09 2021-06-23 2020-10-13 2021-07-07 2021-04-11 individuel pour la modernisa e directe tion du processus de producti on du miel au Bénin. BJ-WACA -203697-CS-INDV / Recrutement d'un consultant pour réaliser l’étude techniq ue d’ouverture et d’aménage Integrated Management of G En cours d'exécut IDA / D4770 A posteriori Individuel Open 20,000.00 0.00 2020-11-30 2020-11-20 2021-01-18 2021-02-08 2021-03-15 2021-09-11 ment de pistes forestières da azetted Forests ion ns les forêts classées de Oué mé-Boukou, Agoua, Tchaouro u -Toui- Kilibo, Dan, Kétou et Logozohè. BJ-WACA -217622-CS-INDV / Recrutement d'un consultant Integrated Management of G IDA / D4770 A posteriori Individuel Open 20,000.00 37,904.97 Signé 2021-04-05 2021-11-02 2021-05-24 2022-04-22 2021-06-14 2022-04-22 2021-07-19 2022-03-14 2022-01-15 individuel pour élaborer le Pl azetted Forests an de Gestion des Pestes et Pesticides du PFC-B. BJ-WACA -217629-CS-INDV / Recrutement d'un consultant individuel pour réaliser les ét IDA / D4770 Project Management A posteriori Individuel Open 20,000.00 0.00 Annulé 2021-04-26 2021-06-14 2021-07-05 2021-08-09 2022-02-05 udes techniques de pistes d' accès aux plantations de 202 1. BJ-WACA -217633-CS-INDV / Recrutement d'un consultant IDA / D4770 Project Management A posteriori Individuel Open 6,000.00 0.00 Annulé 2021-06-29 2021-08-17 2021-09-07 2021-10-12 2022-04-10 individuel pour élaborer un g uide technique de production d'acacia. BJ-WACA -217641-CS-CDS / Elaborer et signer une conve ntion avec le laboratoire de B Sélection de cons iomathématiques et d'Estima IDA / D4770 Project Management A posteriori ultants par entent Direct 230,000.00 0.00 Annulé 2021-04-15 2021-04-25 2021-06-29 2021-12-26 tions Forestières et le labora e directe toire d'Ecologie, de Botaniqu e et de Biologie Végétale pou r la réalisation de l'inventaire forestier dans les forêts class ées. BJ-WACA -217644-CS-CDS / Elaborer et signer une conve Sélection de cons ntion avec le laboratoire d'Ec Integrated Management of G IDA / D4770 A posteriori ultants par entent Direct 120,000.00 0.00 Annulé 2021-04-15 2021-04-25 2021-06-29 2021-12-26 ologie Appliquée pour la réali azetted Forests e directe sation du dénombrement de l a faune dans les forêts classé es. BJ-WACA -217638-CS-CQS / Recrutement d'un consultant individuel pour réaliser l'état Integrated Management of G IDA / D4770 A posteriori Individuel Open 18,000.00 62,748.99 Signé 2021-10-20 2021-06-23 2021-12-08 2021-10-07 2021-12-29 2022-04-18 2022-02-02 2021-12-13 2022-08-01 des lieux des individus, grou azetted Forests pement et structures privées engagés dans l'apiculture, le commerce du miel. BJ-WACA -261167-NC-DIR / S Sélection de cons élection d'un expert local for IDA / D4770 Project Management A posteriori ultants par entent Direct 15,600.00 12,688.21 Signé 2021-12-17 2022-01-19 2021-12-27 2022-04-18 2022-03-02 2022-03-26 2022-08-29 mateur sur la méthode de pa e directe trouille SMART en forêt class ée. BJ-WACA -261172-CS-CDS / Sélection d'un consultant po Sélection de cons ur la réalisation des études t IDA / D4770 Project Management A posteriori ultants par entent Direct 102,000.00 84,038.82 Signé 2021-11-26 2022-01-18 2021-12-06 2022-04-18 2022-02-09 2022-06-11 2022-08-08 echniques du prolongement e directe des pistes forestières, le suivi et contrôle des travaux. BJ-WACA -279021-CS-INDV / Recrutement d'un consultant En cours d'exécut individuel pour la mise en pla IDA / D4770 Project Management A posteriori Individuel Limited 20,000.00 0.00 2022-06-29 2022-05-06 2022-07-04 2022-07-25 2022-08-29 2023-02-25 ion ce d'un système informatiqu e de gestion des plaintes. BJ-WACA -279024-CS-INDV / Recrutement d'un consultant Integrated Management of G En cours d'exécut individuel pour identifier les s IDA / D4770 A posteriori Individuel Open 20,000.00 0.00 2022-08-24 2022-04-23 2022-10-12 2022-11-02 2022-12-07 2023-06-05 azetted Forests ion ystèmes d'énergie solaire ad aptés aux bases vies. BJ-WACA -279175-CS-INDV / Recrutement d'un consultant En cours d'exécut individuel pour identifier les IDA / D4770 Project Management A posteriori Individuel Open 20,000.00 0.00 2022-06-20 2022-04-23 2022-08-08 2022-08-29 2022-10-03 2023-04-01 ion options efficaces de connexio n internet fixe par localité de s bases vies. Page 12 BJ-WACA -279176-CS-INDV / Recrutement d'un consultant individuel pour réaliser la sit En attente d'exéc IDA / D4770 Project Management A posteriori Individuel Open 20,000.00 0.00 2022-05-30 2022-07-18 2022-08-08 2022-09-12 2023-03-11 uation de référence des parc ution elles de reboisement de 202 2 par une prise de vue aérien ne avec drone. BJ-WACA -279180-CS-INDV / Recrutement d'un consultant En attente d'exéc IDA / D4770 Project Management A posteriori Individuel Limited 8,000.00 0.00 2022-05-25 2022-05-30 2022-06-20 2022-07-25 2023-01-21 individuel pour la formation s ution ur la technique d'animation c ommunautaire. BJ-WACA -279182-CS-INDV / Recrutement d'un consultant En cours d'exame individuel pour la formation s IDA / D4770 Project Management A posteriori Individuel Limited 13,000.00 0.00 2022-05-10 2022-11-30 2022-05-15 2022-06-05 2022-07-10 2023-01-06 n ur le suivi évaluation et gesti on axée sur les résultats. BJ-WACA -279185-CS-INDV / Recrutement d'un consultant individuel pour la formation s Integrated Management of G IDA / D4770 A posteriori Individuel Limited 13,000.00 0.00 Annulé 2022-04-28 2022-05-03 2022-05-24 2022-06-28 2022-12-25 ur l'aménagement basé sur l' azetted Forests approche sur les écosystème s et la gestion des conflits. BJ-WACA -279186-CS-INDV / Recrutement d'un consultant individuel pour la formation s En attente d'exéc IDA / D4770 Project Management A posteriori Individuel Limited 10,000.00 0.00 2022-05-10 2022-05-15 2022-06-05 2022-07-10 2023-01-06 ur des structures techniques ution des maires sur les approches d'aménagements durable de s forêts. BJ-WACA -293938-CS-INDV / Recrutement d'un consultant individuel pour la réalisation Integrated Management of G En cours d'exécut IDA / D4770 A posteriori Individuel Open 56,000.00 0.00 2022-06-29 2022-05-20 2022-08-17 2023-10-05 2022-09-07 2023-10-05 2022-10-12 2023-04-10 des études techniques des o azetted Forests ion uvrages de franchissement e t le contrôle des travaux pou r l'accès aux parcelles 2022. BJ-WACA -354502-CS-CDS / Sélection de cons Recrutement d'un consultant Support to Forests Governan IDA / D4770 A posteriori ultants par entent Direct - National 40,000.00 0.00 Signé 2023-09-29 2023-06-30 2023-10-09 2023-10-04 2023-12-13 2023-07-15 2024-06-10 individuel pour organiser l'év ce e directe aluation à mi-parcours du pro jet. BJ-WACA -354510-CS-CDS / Recrutement d'un cabinet po Sélection de cons ur la mission de vérification d Integrated Management of G En cours d'exécut IDA / D4770 A posteriori ultants par entent Direct - National 265,000.00 0.00 2023-05-26 2023-08-10 2023-06-05 2023-08-09 2024-02-05 es travaux communautaires azetted Forests ion e directe d'aménagement forestier du PFC-B au titre de l'année 202 2. BJ-WACA -366297-CS-CDS / Recrutement d'un cabinet po Sélection de cons ur la mission de vérification d Integrated Management of G En cours d'exécut IDA / D4770 A posteriori ultants par entent Direct - National 24,954.00 0.00 2023-07-17 2023-08-10 2023-07-27 2023-09-30 2024-03-28 es travaux communautaires azetted Forests ion e directe d'aménagement forestier du PFC-B au titre de l'année 202 3. BJ-WACA -365941-CS-CDS / Sélection de cons Support to Forests Governan Direct - Internation En cours d'exame Recrutement d'un Assistant T IDA / D4770 A posteriori ultants par entent 210,600.00 0.00 2023-06-28 2023-07-01 2023-07-08 2023-09-11 2024-03-09 ce al n echnique International au pro e directe fit de l'UIGP. BJ-WACA -395207-CS-CDS / Sélection de cons Recrutement d'un auditeur in Support to Forests Governan En attente d'exéc IDA / D4770 A posteriori ultants par entent Direct - National 36,000.00 0.00 2023-12-22 2024-01-01 2024-03-06 2024-09-02 terne au profit de l'Unité Inté ce ution e directe grée de Gestion des Projets ( UIGP). Page 13