PROCUREMENT PLAN General 1. Project Information a. Country: Federal Republic of Somalia b. Project Name: "Biyoole II" Second Water for Agro-Pastoral Productivity and Resilience II c. Project Number: P177627 d. Total Finance: USD 58 million 2. Project Implementation Agency: Ministry of Planning, Investment and Economic Development 3. Date of Project Plan: November 2022 4. Period Covered by this Procurement: November 2022 – May 2024 I. Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016 revised November 2017, August 2018 and November 2020 and) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. II. Bank’s Standard Procurement Document: The Bank’s standard Procurement Documents shall be used for all contracts subject to international competitive procurement and those contracts as specified into Procurement Plan tables in STEP III. National Procurement Arrangements: Not applicable IV. Prequalification: Not applicable V. Leased Assets: Not Applicable VI. Procurement of Second-hand Goods: Not Applicable VII. Domestic Preference: Not Applicable 1 VIII. Hands on Expanded Implementation Support (HEIS): Not applicable IX. Other Relevant Procurement Information: Not Applicable X. Thresholds for Procurement Approaches and Method (US$ millions) Based on the risks identified above, the following procurement arrangements are proposed: a) Approach to Market: Based on previous experience and available local market, the following threshold will be used of open national/international and RFQ bidding (all figures in million USD) Table 1.2: Thresholds for procurement approaches and methods Procurement Methods (US$ millions)–Goods, Works, and Non- Consulting Services Open Open Request for Direct Category Internatio National Quotation Selection nal (RfQ) Works ≥ 5.0 <5.0 ≤ 0.2 All Values Goods, IT, and non- ≥ 0.5 <0.5 ≤ 0.1 All Values consultin g services Thresholds for Procurement Approaches and Methods (US$, millions) – Consulting Services Category Short List of National Consultants Consulting Engineering and Services Construction Supervision Consultants (Firms) ≤ 0.1 ≤ 0.2 Individual Consultants n.a. n.a. Direct Selection Consultants (Firms) All Values All Values Individual Consultants All Values All Values 2 3 XI. Table Packages for Goods, Works and Non-Consulting Services (At Negotiations – to be entered in STEP) Selecti Expected Expected on date of date of Procurement Metho bid/ Contract Contract Title, Approach Ref. Estimated Bank d Evaluation proposal Signature Description and (Open- No Cost (US$) Oversight (RFP, Method opening Category National/ RFB, Limited etc.) RFQ etc.) Goods Most Office Furniture for 01/Nov/20 02/Feb/202 G1 Prior Open-National RFB advantageo the new officers 130,000.00 22 3 us Bid Most Supply of IT 01/Nov/20 02/Feb/202 G2 Prior Open-National RFB advantageo Equipment 140,000.00 22 3 us Bid Most Purchase of Office 01/Nov/20 02/Feb/202 250,000.00 Prior Open-National RFB advantageo G3 vehicles 22 3 us Bid Procurement and Most 01/Nov/20 02/Feb/202 G4 distribution of 210,000.00 Prior Open-National RFB advantageo 22 3 seeds and tools us Bid Sub-total 730,000.00 Works Most Construction of 4,800,000. 01/Dec/20 01/May/20 W1 Prior Open National RFB advantageo new water points 00 22 24 us Bid Most Rehabilitation of 3,800,000. 01/Dec/20 01/May/20 W2 Prior Open National RFB advantageo water points 00 22 24 us Bid 1 Selecti Expected Expected on date of date of Procurement Metho bid/ Contract Contract Title, Approach Ref. Estimated Bank d Evaluation proposal Signature Description and (Open- No Cost (US$) Oversight (RFP, Method opening Category National/ RFB, Limited etc.) RFQ etc.) Most Rangeland 2,300,000. 01/Dec/20 01/May/20 W3 Prior Open National RFB advantageo Rehabilitations 00 22 24 us Bid Sand dunes Most 1,200,000. 01/Dec/20 01/May/20 W4 rehabilitation and Prior Open National RFB advantageo 00 22 24 Restoration us Bid Most Fodder Production 1,500,000. 01/Dec/20 01/May/20 W5 Prior Open National RFB advantageo Fam 00 22 24 us Bid 13,600,000 Sub-total .00 Non-Consulting Services - none Consulting Services. Expected Expected Review by Market Approach Method (QCBS, date of date of Ref Contract Estimated Bank (Open-National/ LCBCS, QBS, bid/ Contract No. Description Cost (US$) (Prior/Post Limited etc.) DS proposal Signature ) opening Backstopping 1,700,000. 01/Nov/20 02/Apr/202 C1 Prior Open International QCBS Engineering firm 00 22 3 Third Party 1,500,000. 01/Nov/20 02/Apr/202 C2 Prior Open International QCBS Monitoring Firm 00 22 3 2 Expected Expected Review by Market Approach Method (QCBS, date of date of Ref Contract Estimated Bank (Open-National/ LCBCS, QBS, bid/ Contract No. Description Cost (US$) (Prior/Post Limited etc.) DS proposal Signature ) opening Security Risk 01/Nov/20 02/Apr/202 C3 Management Firm 1,000,000. Prior Open International QCBS 22 3 00 Project Coordinator 01/Nov/20 01/May/20 C4 144,000.00 Prior Open - National INDV FGS 22 24 Procurement INDV 01/Nov/20 01/May/20 C5 120,000.00 Prior Open - National Specialist FGS 22 24 01/Nov/20 01/May/20 C6 FM Specialist FGS Prior Open - National INDV 110,000.00 22 24 01/Nov/20 01/May/20 C7 GBV Specialist FGS 100,000.00 Prior Open - National INDV 22 24 C8 Environmental 01/Nov/20 01/May/20 100,000.00 Prior Open - National INDV Specialist FGS 22 24 C9 Security Specialist 01/Nov/20 01/May/20 100,000.00 Prior Open - National INDV FGS 22 24 C10 Community 01/Nov/20 01/May/20 Development/Social 100,000.00 Prior Open - National INDV 22 24 Specialist FGS C11 Monitoring and 01/Nov/20 01/May/20 100,000.00 Prior Open - National INDV Evaluation Specialist 22 24 C12 Communications 01/Nov/20 01/May/20 100,000.00 Prior Open - National INDV Specialist FGS 22 24 C13 State project 01/Nov/20 01/May/20 240,000.00 Prior Open - National INDV Coordinators 22 24 C14 State project 01/Nov/20 01/May/20 procurement 210,000.00 Prior Open - National INDV 22 24 specialists C15 State project FM 01/Nov/20 01/May/20 180,000.00 Prior Open - National INDV specialists 22 24 3 Expected Expected Review by Market Approach Method (QCBS, date of date of Ref Contract Estimated Bank (Open-National/ LCBCS, QBS, bid/ Contract No. Description Cost (US$) (Prior/Post Limited etc.) DS proposal Signature ) opening C16 State project Environmental 01/Nov/20 01/May/20 180,000.00 Prior Open - National INDV Safeguards 22 24 specialists C17 State project Social 01/Nov/20 01/May/20 Safeguards 180,000.00 Prior Open - National INDV 22 24 specialists C18 State project M&E 01/Nov/20 01/May/20 180,000.00 Prior Open - National INDV specialists 22 24 C19 01/Nov/20 01/May/20 Senior Engineers 210,000.00 Prior Open - National INDV 22 24 C20 Agricultural 180,000.00 01/Nov/20 01/May/20 Prior Open - National INDV specialist 22 24 180,000.00 01/Nov/20 01/May/20 C21 Livestock specialists Prior Open - National INDV 22 24 Environmental 180,000.00 01/Nov/20 01/May/20 C22 Prior Open - National INDV specialists 22 24 7,094,000. Sub-total 00 21,424,000 Grand-total .00 4 PROCUREMENT Somalia : Barwaaqo - Somalia Water for Rural Resilience Project PLAN General Information Country: Somalia 2023-02-13 Bank’s Approval Date of the Original Procurement Plan: 2024-02-12 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P177627 GPN Date: Project Name: Barwaaqo - Somalia Water for Rural Resilience Project Loan / Credit No: IDA / E1320 Ministry of Planning, investment and Economic Development Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SO-MOPIED - SW-396261-C Request for Quota W-RFQ / Construction of Sand Development of Multiuse Wa Request for Quota Single Stage - One E Under Imple 2025-02-0 IDA / E1320 Post Limited tions (Non Bank-S 190,000.00 0.00 2023-12-13 2023-12-26 2024-02-07 Dam in Washaqo Site in Bako ter Sources tions nvelope mentation 1 PD) ol Region of Southwest State of Somalia SO-MOPIED - SW-396263-C Request for Quota W-RFQ / Construction of El M Development of Multiuse Wa Request for Quota Single Stage - One E Under Imple 2025-02-0 IDA / E1320 Post Limited tions (Non Bank-S 90,000.00 0.00 2023-12-13 2023-12-25 2024-02-07 agad Site, Bakool Region of S ter Sources tions nvelope mentation 1 PD) outhwest State of Somalia SO-MOPIED - SW-396264-C Request for Quota W-RFQ / Construction of Impr Development of Multiuse Wa Request for Quota Single Stage - One E Under Imple 2025-02-0 IDA / E1320 Post Limited tions (Non Bank-S 190,000.00 0.00 2023-12-13 2023-12-26 2024-02-07 oved Haffir Dam in Hiirey Sit ter Sources tions nvelope mentation 1 PD) e, Bakool Region, Southwest State of Somalia SO-MOPIED - SW-396265-C Request for Quota W-RFQ / Construction of Impr Development of Multiuse Wa Request for Quota Single Stage - One E Pending Imp 2025-02-0 IDA / E1320 Post Limited tions (Non Bank-S 190,000.00 0.00 2023-12-13 2024-02-07 oved Haffir Dam in Gurigab S ter Sources tions nvelope lementation 1 PD) ite, Bay Region, Southwest St ate of Somalia SO-MOPIED - SW-396357-C Request for Quota W-RFQ / Goof Gaduud Buuray Development of Multiuse Wa Request for Quota Single Stage - One E Under Imple 2024-08-0 IDA / E1320 Post Limited tions (Non Bank-S 80,000.00 0.00 2023-12-13 2024-02-07 Borehole Rehabilitation, Baid ter Sources tions nvelope mentation 5 PD) oa District, Bay Region SO-MOPIED - SW-396359-C Request for Quota W-RFQ / Jaran Borehole Reha Development of Multiuse Wa Request for Quota Single Stage - One E Under Imple 2024-08-0 IDA / E1320 Post Limited tions (Non Bank-S 80,000.00 0.00 2023-12-13 2024-01-27 2024-02-07 bilitation, Afgoye District, Lo ter Sources tions nvelope mentation 5 PD) wer Shabelle Region SO-MOPIED - SW-396361-C Request for Quota W-RFQ / Ceel Hindi Borehole Development of Multiuse Wa Request for Quota Single Stage - One E Under Imple 2024-08-0 IDA / E1320 Post Limited tions (Non Bank-S 90,000.00 0.00 2023-12-13 2024-02-07 Rehabilitation, Qansax Dheer ter Sources tions nvelope mentation 5 PD) e District, Bay Region SO-MOPIED - SW-396362-C Request for Quota W-RFQ / Minishiinbyo Berked Development of Multiuse Wa Request for Quota Single Stage - One E Under Imple 2024-08-0 IDA / E1320 Post Limited tions (Non Bank-S 90,000.00 0.00 2023-12-13 2024-02-07 Rehabilitation of Qasaxdhere ter Sources tions nvelope mentation 5 PD) District of Bay Region, South west State SO-MOPIED - SW-396363-C Request for Quota W-RFQ / Tawakal Borehole R Development of Multiuse Wa Request for Quota Single Stage - One E Pending Imp 2024-08-0 IDA / E1320 Post Limited tions (Non Bank-S 90,000.00 0.00 2023-12-17 2024-02-11 ehabilitation of Wanlaweyn D ter Sources tions nvelope lementation 9 PD) istrict of Lower Shabelle Regi on SO-MOPIED - SW-396364-C Request for Quota W-RFQ / Towfiiq Borehole Re Development of Multiuse Wa Request for Quota Single Stage - One E Pending Imp 2024-08-0 IDA / E1320 Post Limited tions (Non Bank-S 90,000.00 0.00 2023-12-17 2024-02-11 habilitation Wanlaweyn Distri ter Sources tions nvelope lementation 9 PD) ct of Lower Shabelle Region GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPIED - SW-347964-GO Project Management, Comm Single Stage - One E -RFB / Procurement for SWS IDA / E1320 unity-Driven Development a Prior Request for Bids Open - National 400,000.00 0.00 Signed 2023-04-10 2023-04-17 2023-04-15 2023-05-02 2023-05-27 2023-05-20 2023-06-26 2023-08-09 2023-07-31 2023-09-15 2024-01-27 nvelope Barwaaqo and Line Ministries nd Enhancing Livelihoods Pl Vehicles anning SO-MOPIED - SW-347967-GO Development of Agriculture Single Stage - One E -RFB / Procurement for Mobil IDA / E1320 and Livestock Services Arou Prior Request for Bids Open - National 160,000.00 0.00 Canceled 2023-04-10 2023-04-17 2023-04-15 2023-04-20 2023-05-27 2023-06-26 2023-07-31 2024-01-27 nvelope e Veterinary Clinic Ambulanc nd Water Points e SO-MOPIED - SW-392806-GO -RFQ / Supply and Delivery of Development of Agriculture Request for Quota Single Stage - One E Under Imple Ambulance for Mobile Veterin IDA / E1320 and Livestock Services Arou Post Limited 90,000.00 0.00 2023-12-03 2023-12-09 2024-01-28 2024-07-26 tions nvelope mentation ary Clinic to support MoLFR o nd Water Points f Southwest State, Somalia SO-MOPIED - SW-408015-GO -RFQ / Procurement of water Development of Multiuse Wa Request for Quota Single Stage - One E Pending Impl IDA / E1320 Post Limited 45,000.00 0.00 2024-02-17 2024-04-13 2024-10-10 and rangeland equipments fo ter Sources tions nvelope ementation r Ministries of Environment a nd Water NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPIED - SW-347371-NC Project Management, Comm -RFQ / Office Internet for SW unity-Driven Development a IDA / E1320 Prior Direct Selection Direct - National 30,000.00 0.00 Signed 2023-03-25 2023-03-27 2023-03-30 2023-04-17 2023-05-04 2023-07-26 2024-04-28 S Biyoole Staff and Other Imp nd Enhancing Livelihoods Pl lementing Agencies anning CONSULTING FIRMS Page 1 Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SO-MOPIED - SW-342407-CS Project Management, Comm -CDS / Southwest State Proje IDA / E1320 unity-Driven Development a Prior Direct Selection Direct - National 60,000.00 0.00 Signed 2023-02-15 2023-02-24 2023-02-25 2023-02-24 2023-05-01 2023-03-29 2024-04-25 ct Coordinator nd Enhancing Livelihoods Pl anning SO-MOPIED - SW-342410-CS Project Management, Comm -CDS / Southwest Finance Ma IDA / E1320 unity-Driven Development a Prior Direct Selection Direct - National 45,000.00 0.00 Signed 2023-02-15 2023-02-24 2023-02-25 2023-03-02 2023-05-01 2023-06-12 2024-04-25 nagement Specialist nd Enhancing Livelihoods Pl anning SO-MOPIED - SW-342412-CS Project Management, Comm Individual Consult -INDV / Southwest State Proc IDA / E1320 unity-Driven Development a Prior Limited 45,000.00 0.00 Signed 2023-02-16 2023-02-22 2023-02-21 2023-04-25 2023-03-14 2023-05-17 2023-04-18 2023-05-18 2024-04-12 ant Selection urement Specialist nd Enhancing Livelihoods Pl anning SO-MOPIED - SW-342413-CS Project Management, Comm -CDS / Southwest State M&E IDA / E1320 unity-Driven Development a Prior Direct Selection Direct - National 42,000.00 0.00 Signed 2023-02-15 2023-02-22 2023-02-25 2023-02-24 2023-05-01 2023-03-29 2024-04-25 Specialist nd Enhancing Livelihoods Pl anning SO-MOPIED - SW-342417-CS Project Management, Comm Individual Consult Under Implement -INDV / Southwest State Envi IDA / E1320 unity-Driven Development a Prior Limited 42,000.00 0.00 2023-02-16 2023-02-22 2023-02-21 2023-10-02 2023-03-14 2023-11-13 2023-04-18 2024-04-12 ant Selection ation ronmental Safeguards Specia nd Enhancing Livelihoods Pl list anning SO-MOPIED - SW-344074-CS Project Management, Comm -CDS / Southwest Social Safe IDA / E1320 unity-Driven Development a Prior Direct Selection Direct - National 42,000.00 0.00 Signed 2023-02-22 2023-03-27 2023-03-04 2023-03-01 2023-05-08 2023-07-26 2024-05-02 guards nd Enhancing Livelihoods Pl anning SO-MOPIED - SW-344076-CS Development of Agriculture -CDS / ToR for Livestock Dev IDA / E1320 and Livestock Services Arou Prior Direct Selection Direct - National 39,840.00 0.00 Signed 2023-02-22 2023-02-24 2023-03-04 2023-02-24 2023-05-08 2023-06-12 2024-05-02 elopment Specialist nd Water Points SO-MOPIED - SW-344079-CS Development of Agriculture -CDS / Procurement Plan for IDA / E1320 and Livestock Services Arou Prior Direct Selection Direct - National 39,840.00 0.00 Signed 2023-02-22 2023-02-24 2023-03-04 2023-02-24 2023-05-08 2023-06-12 2024-05-02 Agriculture Specialist nd Water Points SO-MOPIED - SW-344083-CS Development of Environmen -CDS / Southwest Environme IDA / E1320 tal Catchment Services in Pr Prior Direct Selection Direct - National 39,840.00 0.00 Signed 2023-02-22 2023-02-23 2023-03-04 2023-03-02 2023-05-08 2023-06-12 2024-05-02 ntal Specialist oject Areas SO-MOPIED - SW-358314-CS Development of Multiuse Wa IDA / E1320 Prior Direct Selection Direct - National 39,840.00 0.00 Signed 2023-04-26 2023-05-29 2023-05-06 2023-03-02 2023-07-10 2023-03-03 2024-07-04 -CDS / ToR for Senior Water S ter Sources pecialist Page 2