PROCUREMENT PLAN Project information: Bosnia and Herzegovina – Energy Efficiency Project – P143580 Project Implementation agency: Federal Ministry of Physical Planning Date of the Procurement Plan: 4/30/2020 Period covered by this Procurement Plan: 2020-2024 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. If the Borrower and the Bank agreed to use the Borrower’s national open competitive procurement arrangements, it will be subject to paragraph 5.4 of the Procurement Regulations. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable; Works: is not applicable. Other Relevant Procurement Information. None. PROCUREMENT Bosnia and Herzegovina : Energy Efficiency Project PLAN General Information Country: Bosnia and Herzegovina 2020-10-19 Bank’s Approval Date of the Original Procurement Plan: 2024-01-26 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P143580 GPN Date: 2020-03-19 Project Name: Energy Efficiency Project Loan / Credit No: IBRD / 89060 Project Implementing Unit Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E 2,177,141.8 2021-07-3 2021-11 FB-W-20-1-RS / Retrofitting of IBRD / 89060 Post Request for Bids Open - National Completed 2020-10-12 2020-04-17 2020-10-17 2020-11-28 2020-06-05 2020-12-28 2020-06-12 2021-02-01 2020-09-11 ts in Public Facilities nvelope 8 1 -27 public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-2-RS / Retrofitting of IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Under Imple 2021-07-3 FB-W-20-7-RS / Retrofitting of IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-06-12 2020-10-17 2020-11-28 2020-07-03 2020-12-28 2021-02-01 ts in Public Facilities nvelope mentation 1 public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-9-RS / Retrofitting of IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Under Imple 2021-07-3 FB-W-20-10-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-07-15 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope mentation 1 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E 2021-07-3 2021-06 FB-W-20-12-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 311,607.89 Completed 2020-10-12 2021-06-09 2020-10-17 2021-06-09 2020-11-28 2021-06-09 2020-12-28 2020-08-28 2021-02-01 2020-12-13 ts in Public Facilities nvelope 1 -11 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-13-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-14-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-15-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-16-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-17-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-19-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-20-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public building P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-21-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-22-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E 2021-11-0 RFB-W-20-69-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 0.00 Canceled 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope 5 g of public buildings-mechani cal phase P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-08-0 FB-W-20-25-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2020-10-13 2020-10-18 2020-11-29 2020-12-29 2021-02-02 ts in Public Facilities nvelope lementation 1 of public buildings P143580-BA-BEEP-8906BA- RFB-W-20-83-RS / Retrofittin Energy Efficiency Investmen Single Stage - One E Pending Imp 2022-01-2 IBRD / 89060 Post Request for Bids Open - National 0.00 2021-04-05 2021-04-10 2021-05-22 2021-06-21 2021-07-26 g of public buildings-mechani ts in Public Facilities nvelope lementation 2 cal phase Elementary school "Sveti Sava", Gacko P143580-BA-BEEP-8906BA- RFB-W-20-84-RS / Retrofittin Energy Efficiency Investmen Single Stage - One E 2022-01-0 g of public buildings-reconstr IBRD / 89060 Post Request for Bids Open - National 175,670.40 Signed 2021-03-19 2021-03-31 2021-03-24 2021-05-05 2021-04-28 2021-06-04 2021-05-04 2021-07-09 2021-08-03 ts in Public Facilities nvelope 5 uction of toilets of Elementar y school "Zmaj Jova Jovanovi c" Banja Luka P143580-BA-BEEP-8906BA- RFB-W-21-85-RS / Retrofittin Energy Efficiency Investmen Single Stage - One E 2022-01-0 IBRD / 89060 Post Request for Bids Open - National 358,858.54 Signed 2021-03-19 2021-03-31 2021-03-24 2021-06-09 2021-05-05 2021-04-28 2021-06-04 2021-05-05 2021-07-09 2021-07-15 g of public buildings-Universi ts in Public Facilities nvelope 5 ty of Medicine-dentistry P143580-BA-BEEP-8906BA- RFB-W-21-86-RS / retrofitting Energy Efficiency Investmen Single Stage - One E 2022-01-0 2022-01 IBRD / 89060 Post Request for Bids Open - National 224,162.87 Completed 2021-03-19 2021-03-31 2021-03-24 2021-10-15 2021-05-05 2021-04-28 2021-06-04 2021-06-01 2021-07-09 2021-08-06 of public buildings- Secondar ts in Public Facilities nvelope 5 -15 y school of Economics Banja Luka Page 1 P143580-BA-BEEP-8906BA- RFB-W-21-87-RS / Retrofittin Energy Efficiency Investmen Single Stage - One E 2022-01-0 2021-10 IBRD / 89060 Post Request for Bids Open - National 78,397.04 Completed 2021-03-19 2021-03-31 2021-03-24 2021-05-05 2021-04-28 2021-06-04 2021-05-06 2021-07-09 2021-07-22 g of public buildings- Second ts in Public Facilities nvelope 5 -25 ary school of polytechnics Ba nja Luka P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E 2021-11-0 2022-03 RFB-W-20-63-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 117,013.81 Completed 2021-01-17 2021-05-14 2021-01-22 2021-03-05 2021-06-15 2021-04-04 2021-06-25 2021-05-09 2021-08-24 ts in Public Facilities nvelope 5 -17 g of public buildings-mechani cal phase. P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-11-0 RFB-W-20-64-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 0.00 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope lementation 5 g of public buildings-mechani cal phase P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-11-0 RFB-W-20-65-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 0.00 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope lementation 5 g of public buildings-mechani cal phase P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-11-0 RFB-W-20-66-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 0.00 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope lementation 5 g of public buildings-mechani cal phase P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-11-0 RFB-W-20-68-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 0.00 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope lementation 5 g of public buildings-mechani cal phase P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-11-0 RFB-W-20-70-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 0.00 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope lementation 5 g of public buildings-mechani cal phase P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-11-0 RFB-W-20-71-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 0.00 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope lementation 5 g of public buildings-mechani cal phase P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-11-0 RFB-W-20-72-RS / retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope lementation 5 of public buildings-mechanic al phase P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Single Stage - One E 2021-11-0 RFB-W-20-67-RS / Retrofittin IBRD / 89060 Post Request for Bids Open - National 0.00 Canceled 2021-01-17 2021-01-22 2021-03-05 2021-04-04 2021-05-09 ts in Public Facilities nvelope 5 g of public buildings-mechani cal phase P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Single Stage - One E 2021-07-3 FB-W-20-18-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National 0.00 Canceled 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope 1 of public buildings Request for B P143580-BA-BEEP-8906BA- ids - Small W RFB-W-21-90-RS / Retrofittin Energy Efficiency Investmen Single Stage - One E Pending Imp 2022-03-2 IBRD / 89060 Post Request for Bids Open - National orks SPD (1 e 0.00 2021-06-10 2021-06-15 2021-07-27 2021-08-26 2021-09-30 g of public buildings- Rectory ts in Public Facilities nvelope lementation 9 nvelope proc building,Banja Luka ess) Request for B P143580-BA-BEEP-8906BA-R ids - Works ( Energy Efficiency Investmen Single Stage - One E Pending Imp 2021-07-3 FB-W-20-11-RS / Retrofitting IBRD / 89060 Post Request for Bids Open - National without preq 0.00 2020-10-12 2020-10-17 2020-11-28 2020-12-28 2021-02-01 ts in Public Facilities nvelope lementation 1 of public building ualification) SPD Request for B P143580-BA-BEEP-8906BA- ids - Small W RFB-W-21-96-RS / Rectory bu Energy Efficiency Investmen Single Stage - One E Pending Imp 2022-11-2 IBRD / 89060 Post Request for Bids Open - National orks SPD (1 e 0.00 2022-02-10 2022-02-15 2022-03-29 2022-04-28 2022-06-02 ilding, Banja Luka, University ts in Public Facilities nvelope lementation 9 nvelope proc of Banja Luka, Mechanical p ess) hase National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-21-97-RS / Faculty of Energy Efficiency Investmen Single Stage - One E Pending Imp 2022-11-2 IBRD / 89060 Post Request for Bids Open - National ument - 1 En 0.00 2022-02-10 2022-02-15 2022-03-29 2022-04-28 2022-06-02 Medicine, Foca, Mechanical p ts in Public Facilities nvelope lementation 9 velope proce hase ss (Non Bank -SPD) National Proc P143580-BA-BEEP-8906BA-R urement Doc FB-W-22-106-RS / Secondary Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2022-12-1 School of Economics Banja L IBRD / 89060 Post Request for Bids Open - National 0.00 2022-02-27 2022-03-04 2022-04-15 2022-05-15 2022-06-19 ts in Public Facilities nvelope velope proce lementation 6 uka and Secondary School of ss (Non Bank Polytechnics, Banja Luka, Me -SPD) chanical phase National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-22-107-RS / Retrofitti Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2022-12-1 IBRD / 89060 Post Request for Bids Open - National 0.00 2022-02-27 2022-03-04 2022-04-15 2022-05-15 2022-06-19 ng of public buildings- Univer ts in Public Facilities nvelope velope proce lementation 6 sity of Banja Luka, Rectory b ss (Non Bank uilding, Banja Luka -SPD) National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-22-108-RS / Universit Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2022-12-1 IBRD / 89060 Post Request for Bids Open - National 0.00 2022-02-27 2022-03-04 2022-04-15 2022-05-15 2022-06-19 y of Banja Luka, Faculty of H ts in Public Facilities nvelope velope proce lementation 6 umanities and Social Science ss (Non Bank s, Banja Luka -SPD) National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-22-109-RS / Health Ce Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2022-12-1 IBRD / 89060 Post Request for Bids Open - National 0.00 2022-02-27 2022-03-04 2022-04-15 2022-05-15 2022-06-19 nter “Dr Milenko Muratovic", ts in Public Facilities nvelope velope proce lementation 6 Berkovici, Mechanical phase ss (Non Bank -SPD) National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-22-110-RS / Elementa Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2022-12-1 IBRD / 89060 Post Request for Bids Open - National 0.00 2022-02-27 2022-03-04 2022-04-15 2022-05-15 2022-06-19 ry school "Sveti Sava" Kakmu ts in Public Facilities nvelope velope proce lementation 6 z/Petrovo, Mechanical phase ss (Non Bank -SPD) National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-22-111-RS / High Sch Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2022-12-1 IBRD / 89060 Post Request for Bids Open - National 0.00 2022-02-27 2022-03-04 2022-04-15 2022-05-15 2022-06-19 ool Centre “Jovan Cvijić” Mod ts in Public Facilities nvelope velope proce lementation 6 riča, Mechanical phase ss (Non Bank -SPD) National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-22-112-RS / Elementa Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2022-12-1 IBRD / 89060 Post Request for Bids Open - National 0.00 2022-02-27 2022-03-04 2022-04-15 2022-05-15 2022-06-19 ry school "Sveti Vasilije Ostro ts in Public Facilities nvelope velope proce lementation 6 ški” Trebinje, Mechanical pha ss (Non Bank se -SPD) National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-20-67-RS. / University Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2022-12-1 IBRD / 89060 Post Request for Bids Open - National 0.00 2022-02-21 2022-02-26 2022-04-09 2022-05-09 2022-06-13 of Medicine-dentistry Banja L ts in Public Facilities nvelope velope proce lementation 0 uka, Mechanical phase ss (Non Bank -SPD) National Proc P143580-BA-BEEP-8906BA- urement Doc RFB-W-22-119-RS / P143580- Energy Efficiency Investmen Single Stage - One E ument - 1 En Pending Imp 2023-09-1 BA-BEEP-8906BA- RFB-W-22- IBRD / 89060 Post Request for Bids Open - National 0.00 2022-11-30 2022-12-05 2023-01-16 2023-02-15 2023-03-22 ts in Public Facilities nvelope velope proce lementation 8 119-RS PBC_ High School Ce ss (Non Bank ntre “Jovan Cvijić” Modriča -SPD) Page 2 GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Request for Quota Single Stage - One E Under Imple IBRD / 89060 Post Open - National 0.00 2020-12-06 2021-01-31 2021-07-30 RFQ-G-20-26- RS / Metering e ts in Public Facilities tions nvelope mentation quipment P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Request for Quota Single Stage - One E RFQ-G-20-27- RS / Equipment IBRD / 89060 Post Open - National 28,009.05 Signed 2020-12-06 2021-01-31 2022-07-23 2021-07-30 2022-07-28 ts in Public Facilities tions nvelope for supervision - vehicle P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Request for Quota Single Stage - One E IBRD / 89060 Post Open - National 0.00 Canceled 2020-12-06 2021-01-31 2021-07-30 RFQ-G-20-28- RS / Video Surv ts in Public Facilities tions nvelope eillance P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Request for Quota Single Stage - One E Pending Impl RFQ-G-20-29- RS / Supply of IBRD / 89060 Post Open - National 0.00 2020-12-06 2021-01-31 2021-07-30 ts in Public Facilities tions nvelope ementation solar panels P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Request for Quota Single Stage - One E FQ-G-22-120-RS / Office Furni IBRD / 89060 Post Limited 0.00 Completed 2022-12-02 2022-11-23 2023-01-27 2022-12-09 2023-07-26 ts in Public Facilities tions nvelope ture for the PIU P143580-BA-BEEP-8906BA- RFQ-G-24-1-RS / Procuremen t of thermoregulation valves Energy Efficiency Investmen Request for Quota Single Stage - One E Pending Impl for radiators of heating in pu IBRD / 89060 Post Limited 0.00 2024-01-29 2024-02-15 2024-02-26 ts in Public Facilities tions nvelope ementation blic building-University of Ba nja Luka, Faculty of Humaniti es and Social Sciences, Banja Luka NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual P143580-BA-BEEP-5538BA-C Energy Efficiency Investmen Consultant Qualifi Pending Impleme Q-CS-19-82-RS / Technical de IBRD / 89060 Post Open - National 0.00 2020-10-12 2020-11-02 2020-12-16 2021-01-15 2021-02-19 2021-08-18 ts in Public Facilities cation Selection ntation sign audit P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Consultant Qualifi Pending Impleme IBRD / 89060 Post Open - National 0.00 2020-10-12 2020-11-02 2020-12-16 2021-01-15 2021-02-19 2021-08-18 FP-CQ-20-3-RS / Supervision ts in Public Facilities cation Selection ntation of works P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Consultant Qualifi Pending Impleme IBRD / 89060 Post Open - National 0.00 2020-10-12 2020-11-02 2020-12-16 2021-01-15 2021-02-19 2021-08-18 FP-CQ-20-23-RS / Supervision ts in Public Facilities cation Selection ntation of works P143580-BA-BEEP-5393BA-Q BS-CS-14-23-RS / EE Informat Energy Efficiency Investmen Quality Based Sel IBRD / 89060 Post Open - National 282,728.17 Signed 2020-10-12 2021-03-13 2020-11-02 2021-03-17 2020-12-16 2021-03-29 2021-01-13 2021-03-31 2021-02-12 2021-04-13 2021-03-14 2021-04-16 2021-04-18 2020-08-24 2022-04-18 ion system development (Ph ts in Public Facilities ection ase 1 and Phase 2) P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Consultant Qualifi Under Implement RFP-CQ-20-75-RS / Detailed E IBRD / 89060 Post Open - National 0.00 2020-11-25 2020-11-23 2020-12-16 2021-01-29 2021-02-28 2021-04-04 2021-10-01 ts in Public Facilities cation Selection ation nergy Audit P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Quality Based Sel RFP-QBS-20-30- R / Project i IBRD / 89060 Post Open - National 0.00 Canceled 2020-10-12 2020-11-02 2020-12-16 2021-01-13 2021-02-12 2021-03-14 2021-04-18 2022-04-18 ts in Public Facilities ection mplementation and monitori ng assistance P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Consultant Qualifi RFP-CQ-20-40-RS / Trainings IBRD / 89060 Post Open - National 0.00 Under Review 2020-12-24 2021-11-25 2021-01-14 2021-02-27 2021-03-29 2021-05-03 2021-10-30 ts in Public Facilities cation Selection and event management P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Consultant Qualifi Under Implement IBRD / 89060 Post Open - National 0.00 2021-05-31 2022-06-03 2021-06-21 2021-08-04 2021-09-03 2021-10-08 2022-04-06 RFP-CQ-21-88-RS / Energy ce ts in Public Facilities cation Selection ation rtificates P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Consultant Qualifi FP-CQ-CS-21-92-R / Supervisi IBRD / 89060 Post Open - National 0.00 Canceled 2021-06-10 2021-07-01 2021-08-14 2021-09-13 2021-10-18 2022-04-16 ts in Public Facilities cation Selection on of works P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Consultant Qualifi IBRD / 89060 Post Open - National 1.67 Signed 2021-06-10 2021-04-22 2021-07-01 2021-08-14 2021-07-19 2021-09-13 2021-11-08 2021-10-18 2021-10-31 2022-04-16 FP-CQ-CS-21-93-R / Technical ts in Public Facilities cation Selection design P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Consultant Qualifi Pending Impleme FP-CQ-CS-21-94-R / Technical IBRD / 89060 Post Open - National 0.00 2021-06-18 2021-07-09 2021-08-22 2021-09-21 2021-10-26 2022-04-24 ts in Public Facilities cation Selection ntation design audit P143580-BA-BEEP-8906BA- Support for the Developmen Consultant Qualifi RFP-CQ-21-98-RS / FIDIC trai IBRD / 89060 t of Scalable Financing Mech Post Open - National 0.00 Canceled 2021-07-09 2021-07-30 2021-09-12 2021-10-12 2021-11-16 2022-05-15 cation Selection ning for PIU BEEP staff anisms and Capacity Buildin g P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Consultant Qualifi FP-CQ-21-99-RS / Project mo IBRD / 89060 Post Open - National 0.00 Signed 2021-10-15 2021-11-14 2021-11-05 2021-12-19 2022-08-04 2022-01-18 2022-09-29 2022-02-22 2022-10-16 2022-08-21 ts in Public Facilities cation Selection nitoring assistance P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Quality Based Sel IBRD / 89060 Post Open - National 0.00 Canceled 2020-12-30 2021-01-20 2021-03-05 2021-04-02 2021-05-02 2021-06-01 2021-07-06 2022-07-06 RFP-QBS-20-42-RS / Training ts in Public Facilities ection s P143580-BA-BEEP-8906BA-R FP-CQ-20-42-RS / TRAINING The objective of the assignm Support for the Developmen ent is to organize training for t of Scalable Financing Mech Consultant Qualifi Under Implement IBRD / 89060 Post Open - National 0.00 2022-01-27 2021-11-17 2022-02-17 2022-04-02 2022-05-02 2022-06-06 2022-12-03 various project stakeholders anisms and Capacity Buildin cation Selection ation to spread know-how, share le g ssons learned, and additional ly improve knowledge of the PIU staff. Page 3 P143580-BA-BEEP-8906BA-R Support for the Developmen Consultant Qualifi Pending Impleme FP-CQ-21-100-RS / PIU Techni IBRD / 89060 t of Scalable Financing Mech Post Open - National 0.00 2022-02-18 2022-03-11 2022-04-24 2022-05-24 2022-06-28 2022-12-25 cation Selection ntation cal Assistence anisms and Capacity Buildin g P143580-BA-BEEP-8906BA-R Support for the Developmen FP-CQ-22-116-RS / P143580- t of Scalable Financing Mech Consultant Qualifi Under Implement IBRD / 89060 Post Open - National 0.00 2022-10-07 2022-10-07 2022-10-28 2022-12-11 2023-01-10 2023-02-14 2023-08-13 BA-BEEP-8906BA-RFP-CQ-22- anisms and Capacity Buildin cation Selection ation 116-RS Energy Certificates 1 g P143580-BA-BEEP-8906BA-R Support for the Developmen FP-CQ-22-117-RS / P143580- t of Scalable Financing Mech Consultant Qualifi IBRD / 89060 Post Open - National 0.00 Signed 2022-10-07 2022-10-13 2022-10-28 2022-12-11 2022-11-15 2023-01-10 2022-11-25 2023-02-14 2022-12-04 2023-08-13 BA-BEEP-8906BA-RFP-CQ-22- anisms and Capacity Buildin cation Selection 117-RS Energy Certificates 2 g P143580-BA-BEEP-8906BA-R Support for the Developmen FP-CQ-22-118-RS / P143580- t of Scalable Financing Mech Consultant Qualifi Under Implement IBRD / 89060 Post Open - National 0.00 2022-10-07 2022-10-13 2022-10-28 2022-12-11 2022-11-15 2023-01-10 2022-11-25 2023-02-14 2023-08-13 BA-BEEP-8906BA-RFP-CQ-22- anisms and Capacity Buildin cation Selection ation 118-RS Energy Certificates 3 g P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen Consultant Qualifi Under Implement FP-CQ-CS-23-1-RS / Feasibilit IBRD / 89060 Post Open - National 0.00 2023-08-01 2023-08-15 2023-09-01 2023-10-01 2023-11-05 2024-02-29 ts in Public Facilities cation Selection ation y study for PPP-solar panels INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult RFP-IC-20-39-RS / Review of t IBRD / 89060 Post Open 0.00 Canceled 2020-12-25 2021-02-12 2021-03-05 2021-04-09 2021-10-06 ts in Public Facilities ant Selection he Promotion Action Plan P143580-BA-BEEP-8906BA- RFP-IC-20-46-RS / Study on Energy Efficiency Investmen Individual Consult macroeconomic effects of EE IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 ts in Public Facilities ant Selection measures (Economics Exper t) (Key Expert Coordinator) P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult Pending Impleme RFP-IC-20-24-RS / Social Mon IBRD / 89060 Post Open 0.00 2020-10-12 2020-11-30 2020-12-21 2021-01-25 2021-07-24 ts in Public Facilities ant Selection ntation itoring - Metodology and Bas eline Survay P143580-BA-BEEP-8906BA- RFP-IC-20-52-RS / Social Mon Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 itoring - Metodology and Surv ts in Public Facilities ant Selection ay after investment P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult RFP-IC-20-53-RS / Social Mon IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 ts in Public Facilities ant Selection itoring - Data Analysis and Fi nal Report P143580-BA-BEEP-8906BA- Energy Efficiency Investmen RFP-IC-20-55-RS / Procureme IBRD / 89060 Prior Direct Selection Direct 20,334.62 Signed 2020-11-01 2020-11-24 2020-11-11 2020-12-01 2021-01-15 2020-11-06 2021-07-14 ts in Public Facilities nt Manager P143580-BA-BEEP-8906BA- Energy Efficiency Investmen IBRD / 89060 Prior Direct Selection Direct 31,923.68 Signed 2020-11-01 2020-11-24 2020-11-11 2020-11-02 2021-01-15 2020-11-10 2021-07-14 RFP-IC-20-56-RS / Accountant ts in Public Facilities P143580-BA-BEEP-8906BA- Energy Efficiency Investmen IBRD / 89060 Prior Direct Selection Direct 34,090.70 Signed 2020-11-01 2020-11-24 2020-11-11 2020-11-02 2021-01-15 2020-11-18 2021-07-14 RFP-IC-20-57-RS / Operations ts in Public Facilities officer P143580-BA-BEEP-8906BA- Energy Efficiency Investmen IBRD / 89060 Prior Direct Selection Direct 25,619.59 Signed 2020-11-01 2020-11-24 2020-11-11 2020-11-02 2021-01-15 2020-11-06 2021-07-14 RFP-IC-20-58-RS / Technical e ts in Public Facilities xpert 1 P143580-BA-BEEP-8906BA-R Energy Efficiency Investmen IBRD / 89060 Prior Direct Selection Direct 112,351.28 Signed 2020-10-13 2020-11-26 2020-10-23 2020-12-02 2020-12-27 2020-06-22 2021-06-25 FP-IC-20-5-RS / Technical Exp ts in Public Facilities ert 2 P143580-BA-BEEP-8906BA- Energy Efficiency Investmen IBRD / 89060 Post Direct Selection Direct 0.00 Under Review 2020-11-01 2021-02-01 2020-11-11 2021-01-15 2021-07-14 RFP-IC-20-62-RS / Driver ts in Public Facilities P143580-BA-BEEP-8906BA- RFP-IC-20-73-RS / Preparatio Energy Efficiency Investmen Individual Consult Under Implement n of Pre-study for heating on IBRD / 89060 Post Open 0.00 2020-11-15 2022-11-24 2021-01-03 2021-01-24 2021-02-28 2021-08-27 ts in Public Facilities ant Selection ation biomass for Psychiatry Prijed or (analysis for piloting of pu blic-private partnership) P143580-BA-BEEP-8906BA- Energy Efficiency Investmen RFP-IC-20-60-RS / Accountant IBRD / 89060 Prior Direct Selection Direct 33,336.43 Signed 2020-11-01 2020-11-24 2020-11-11 2020-11-02 2021-01-15 2020-11-06 2021-07-14 ts in Public Facilities and financial specialist P143580-BA-BEEP-8906BA- RFP-IC-20-79-RS / Preparatio n of Pre-study for heating on Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Completed 2021-03-31 2022-11-24 2021-05-19 2022-11-14 2021-06-09 2022-11-29 2021-07-14 2022-12-21 2022-01-10 biomass for Faculty in Zvorni ts in Public Facilities ant Selection k and Modrica (analysis for pi loting of public-private partn ership) P143580-BA-BEEP-8906BA- RFP-IC-20-80-RS / Preparatio n of Pre-study for heating on Energy Efficiency Investmen Individual Consult Under Implement IBRD / 89060 Post Open 0.00 2021-03-31 2022-11-24 2021-05-19 2021-06-09 2021-07-14 2022-01-10 biomass for school in Modric ts in Public Facilities ant Selection ation a and Zvornik (analysis for pi loting of public-private partn ership) P143580-BA-BEEP-8906BA- RFP-IC-20-31-RS / ESCO mod Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Canceled 2020-12-15 2021-02-02 2021-02-23 2021-03-30 2021-09-26 el RS - Energy Efficiency Exp ts in Public Facilities ant Selection ert (Key Expert Coordinator) P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult RFP-IC-20-32-RS / ESCO mod IBRD / 89060 Post Open 0.00 Canceled 2020-12-15 2021-02-02 2021-02-23 2021-03-30 2021-09-26 ts in Public Facilities ant Selection el RS - Financial Expert (Supp ort Expert) P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult RFP-IC-20-33-RS / ESCO mod IBRD / 89060 Post Open 0.00 Canceled 2020-12-15 2021-02-02 2021-02-23 2021-03-30 2021-09-26 ts in Public Facilities ant Selection el RS - Tax Expert (Support E xpert) Page 4 P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult RFP-IC-20-34-RS / ESCO mod IBRD / 89060 Post Open 0.00 Canceled 2020-12-15 2021-02-02 2021-02-23 2021-03-30 2021-09-26 ts in Public Facilities ant Selection el RS - Banking Expert (Supp ort Expert) P143580-BA-BEEP-8906BA- RFP-IC-20-38-RS / Pilot model Energy Efficiency Investmen Individual Consult Pending Impleme IBRD / 89060 Post Open 0.00 2020-12-20 2021-02-07 2021-02-28 2021-04-04 2021-10-01 contracting and ESCO model ts in Public Facilities ant Selection ntation (Finance Expert) (Support Ex pert) P143580-BA-BEEP-8906BA- RFP-IC-20-36-RS / Pilot model Energy Efficiency Investmen Individual Consult Pending Impleme contracting and ESCO model IBRD / 89060 Post Open 0.00 2020-12-20 2021-02-07 2021-02-28 2021-04-04 2021-10-01 ts in Public Facilities ant Selection ntation (Energy Efficiency Expert) (K ey Expert Coordinator) P143580-BA-BEEP-8906BA- RFP-IC-20-37-RS / Pilot model Energy Efficiency Investmen Individual Consult Pending Impleme IBRD / 89060 Post Open 0.00 2020-12-20 2021-02-07 2021-02-28 2021-04-04 2021-10-01 contracting and ESCO model ts in Public Facilities ant Selection ntation (Technical Expert) (Support E xpert) P143580-BA-BEEP-8906BA- RFP-IC-20-74-RS / Pilot model Energy Efficiency Investmen Individual Consult Pending Impleme IBRD / 89060 Post Open 0.00 2021-03-10 2021-04-28 2021-05-19 2021-06-23 2021-12-20 contracting and ESCO model ts in Public Facilities ant Selection ntation (Procurement Expert) P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult RFP-IC-20-35-RS / Feasibility IBRD / 89060 Post Open 0.00 Canceled 2020-12-15 2022-11-29 2021-02-02 2021-02-23 2021-03-30 2021-09-26 ts in Public Facilities ant Selection study for PPP P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Signed 2020-12-01 2022-11-29 2021-01-19 2022-12-15 2021-02-09 2022-12-15 2021-03-16 2023-01-07 2021-09-12 RFP-IC-20-41-RS / Online PR ts in Public Facilities ant Selection Campaign P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult RFP-IC-20-43-RS / Developme IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 ts in Public Facilities ant Selection nt of energy RS management model P143580-BA-BEEP-8906BA- RFP-IC-20-44-RS / Developme Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 nt of training programs for R ts in Public Facilities ant Selection S energy management P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 RFP-IC-20-45-RS / Preparatio ts in Public Facilities ant Selection n of TOR P143580-BA-BEEP-8906BA- RFP-IC-20-47-RS / Study on Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 macroeconomic effects of EE ts in Public Facilities ant Selection measures (Energy Efficiency Expert) P143580-BA-BEEP-8906BA- RFP-IC-20-48-RS / Study on Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 macroeconomic effects of EE ts in Public Facilities ant Selection measures (Modeling Expert) P143580-BA-BEEP-8906BA- RFP-IC-20-49-RS / Study on Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Canceled 2020-12-30 2021-02-17 2021-03-10 2021-04-14 2021-10-11 macroeconomic effects of EE ts in Public Facilities ant Selection measures (Public Finance Ex pert) P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult Under Implement RFP-IC-20-50-RS / EE Informa IBRD / 89060 Post Open 0.00 2021-01-11 2022-11-29 2021-03-01 2021-03-22 2021-04-26 2021-10-23 ts in Public Facilities ant Selection ation tion system development Su pervision P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult Under Implement RFP-IC-20-54-RS / WBIF Proje IBRD / 89060 Post Open 0.00 2020-12-30 2022-11-20 2021-02-17 2021-03-10 2021-04-14 2021-10-11 ts in Public Facilities ant Selection ation ct Aplication Preparation P143580-BA-BEEP-8906BA- Energy Efficiency Investmen RFP-IC-20-61-RS / IC commun IBRD / 89060 Prior Direct Selection Direct 0.00 Canceled 2020-11-01 2020-11-11 2021-01-15 2021-07-14 ts in Public Facilities ication officer P143580-BA-BEEP-8906BA- Energy Efficiency Investmen Individual Consult RFP-IC-21-89-RS / IC ommuni IBRD / 89060 Post Open 0.00 Under Review 2021-03-16 2021-03-23 2021-05-04 2021-05-25 2021-06-29 2021-12-26 ts in Public Facilities ant Selection cation officer P143580-BA-BEEP-8906BA-R FP-IC-21-91-RS / Position of P Individual Consult IBRD / 89060 Project Management Post Open 22,335.18 Signed 2021-06-09 2021-05-24 2021-07-28 2021-05-11 2021-08-18 2021-05-11 2021-09-22 2022-03-09 2022-03-21 rocurement Manager at RS Pr ant Selection oject Implementation Unit BE EP P143580-BA-BEEP-8906BA-R FP-IC-21-95-RS / Position of P Individual Consult Under Implement IBRD / 89060 Project Management Post Open 0.00 2021-06-09 2021-05-25 2021-07-28 2021-08-18 2021-09-22 2022-03-21 rocurement Officer at RS Proj ant Selection ation ect Implementation Unit BEE P P143580-BA-BEEP-8906BA-R Individual Consult FP-IC-22-102-RS / Director of IBRD / 89060 Project Management Post Limited 0.00 Signed 2022-01-26 2022-01-16 2022-01-31 2022-05-03 2022-02-21 2022-05-03 2022-03-28 2022-06-08 2022-09-24 ant Selection the Project Implementation U nit BEEP RS P143580-BA-BEEP-8906BA- RFP-IC-22-101-RS / Project M IBRD / 89060 Project Management Post Direct Selection Direct 11,775.77 Signed 2022-01-27 2022-01-18 2022-02-06 2022-02-26 2022-04-12 2022-03-16 2022-10-09 2022-09-11 anagement Advisor - during t he transition period, 6 month , direct contracting P143580-BA-BEEP-8906BA- Individual Consult RFP-IC-22-104-RS / Building E IBRD / 89060 Project Management Post Limited 78,927.71 Signed 2022-01-28 2022-01-18 2022-02-02 2022-02-25 2022-02-23 2022-02-25 2022-03-30 2022-03-06 2022-09-26 ant Selection xpert (PIU) P143580-BA-BEEP-8906BA- RFP-IC-21-96-RS / Accountant Energy Efficiency Investmen Individual Consult IBRD / 89060 Post Open 0.00 Signed 2021-08-03 2021-07-01 2021-09-21 2021-06-30 2021-10-12 2021-07-01 2021-11-16 2021-07-08 2022-05-15 and Financial Specialist - full- ts in Public Facilities ant Selection time position in PIU team P143580-BA-BEEP-8906BA- Support for the Developmen RFP-IC-22-105-RS / EE Inform t of Scalable Financing Mech Individual Consult ation system development- P IBRD / 89060 Post Limited 0.00 Completed 2022-02-10 2022-03-29 2022-02-15 2022-08-15 2022-03-08 2022-08-15 2022-04-12 2022-09-08 2022-10-09 2023-01-15 anisms and Capacity Buildin ant Selection reparation and drafting of leg g al acts and regulations Page 5 P143580-BA-BEEP-8906BA-R Individual Consult FP-IC-22-103-RS / Project Ma IBRD / 89060 Project Management Post Limited 0.00 Signed 2022-09-01 2022-09-01 2022-09-06 2022-08-22 2022-09-27 2022-08-22 2022-11-01 2022-09-08 2023-04-30 ant Selection nagement Advisor (half-time) P143580-BA-BEEP-8906BA- Individual Consult RFP-IC-22-113-RS / Building E IBRD / 89060 Project Management Post Limited 0.00 Signed 2022-07-15 2022-06-01 2022-07-20 2022-06-13 2022-08-10 2022-07-01 2022-09-14 2022-07-08 2023-03-13 ant Selection xpert in PIU RS BEEP P143580-BA-BEEP-8906BA- Energy Efficiency Investmen IBRD / 89060 Post Direct Selection Direct - National 0.00 Canceled 2022-08-15 2022-08-25 2022-10-29 2023-04-27 RFP-IC-22-114-RS / Driver ts in Public Facilities P143580-BA-BEEP-8906BA- Support for the Developmen Individual Consult RFP-IC-22-115-RS / Legal Exp IBRD / 89060 t of Scalable Financing Mech Post Limited 0.00 Completed 2022-08-26 2022-11-22 2022-08-31 2022-11-28 2022-09-21 2022-11-28 2022-10-26 2022-12-08 2023-04-24 2023-01-18 ant Selection ert anisms and Capacity Buildin g Page 6