REGIONAL ROADS DEVELOPMENT PROJECT (P146334) Procurement Overview 1. Procurement for the proposed project will be carried out in accordance with the World Bank’s “Guidelines”: Procurement of Goods, Works and non-Consulting Services under IBRD Loans and IDA Credits & Grants by World Bank Borrowers” dated January 2011 and revised July 2014 (Procurement Guidelines) and “Guidelines: Selection and Employment of Consultants under IBRD Loans and IDA Credits & Grants by World Bank Borrowers” dated January 2011 and revised July 2014 (Consultant Guidelines) and the provisions stipulated in the Financing Agreement. For each contract to be financed by the Bank, the different procurement methods or consultant selection methods, the need for prequalification, estimated costs, prior review requirements, and time frame are agreed between the Recipient and the Bank project team in the Procurement Plan. The Procurement Plan will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity. If there is conflict between the Government decrees, rules and regulations and the Bank Procurement and Consultant Guidelines, then Bank Guidelines shall prevail. In addition, the project will also follow “Guidelines on Preventing and Combating Fraud and Corruption in Projects Financed by IBRD Loans and IDA Credits and Grants dated October 15, 2006 and revised in January 2011.” 2. A Country Procurement Assessment was conducted in 2003 (by the World Bank and ADB) and it identified certain weaknesses in the public procurement system in Uzbekistan. The recent assessments under the Country Integrated Fiduciary Assessment(CIFA) and Public Expenditures Financial Accountability Assessment(PEFA) studies indicate that there is still ample room for changes and improvement in the public procurement environment and the same weaknesses largely remain today: (i) absence of a unified legislative framework; (ii) inefficient and non-transparent procurement practices; (iii) absence of a single institution with oversight or regulatory function for public procurement; (iv) weak capacity for reviewing bidders’ complaints; (v) complicated internal review/approval of bid evaluation reports which leads to lack of accountability and delays; (vi) no comprehensive anti-corruption measures; and low skills/capacity of the staff handling public procurement at various administrative level. Private sector suppliers and contractors remain unsatisfied with the rules governing public procurement and have little confidence in the system’s fairness. Though the Government has started extensive reforms of its public procurement system including drafting a Public Procurement Law based on UNCITRAL Model law, at present, the procurement environment is considered as high risk. 3. An assessment of the implementing agency’s (RRF) to procure was carried out by the Bank team using PRAMS, and the following additional risks were identified: (i) the government decrees and rules and regulations have internal conflict in major provisions such as price verification which leads to considerable delays in project procurement and implementation; (ii) The requirement to clear at each stage of procurement with eleven member Inter Ministerial Bidding Committee (IMBC) leads to tremendous delays and lack of accountability of the implementing agency in procurement and project implementation (iii) the difficulty in obtaining bank guarantee for bid security and performance security by the local bidders and non- availability of alternative instruments for such purpose in the country banking 1 system in particular Joint Ventures; (iv) there are number bid evaluation committees/stages and the interdepartmental tender committee consists of eleven members and the minutes signing takes 2 months or more; (v) from bid opening to the start of contract implementation takes minimum of 6 to 12 months and (vi) considerable procurement delays due to registration of contracts with International Contractors/Suppliers/Consultants and price verification (this procedure is not in line with the Bank Procurement Guidelines) by MFERIT. After risk mitigation, the procurement capacity and arrangements at the Project level are considered acceptable. Procurement training will be provided to the PIU procurement specialists throughout the project implementation. 4. Procurement Arrangement and Staffing: The PIU under the Republican Road Fund is responsible for the day-to-day implementation of the project and has to be established yet. Further hiring of experienced international and national procurement specialists in the PIU may be required by the project effectiveness. Procurement training will be provided to the procurement specialists of the PIU and Road Fund staff throughout the project implementation. It would be strongly suggested that the Evaluation Committee members shall be also trained in the Bank procurement and evaluation procedures. The PMM shall be developed by the RRF and that shall reflect the detailed internal approval stages and the approval process and stages, timeline. The price verification and reasonableness of recommended contract value will be carried out as part of bid evaluation and the contracts will be awarded and signed as soon as Bank’s no-objection is issued and signed contract and Performance Security (whenever required) is submitted to the Bank within 6 weeks of Bank’s no-objection to the BER. The PMM will also indicate the timeline and procedures for complaint handling. Any complaints concerning the procurement or other aspects of the Project implementation have to be registered and dealt within a time frame agreed in the PMM. 5. Following the Memorandum of Understanding (MoU) signed on January 8, 2014 between the Bank and the Government the project will initiate advance procurement as soon as possible. The procurement of civil works contract for road works of Tashkent Region and selection of consultant for Design (including feasibility study for Namangan, Andijan and Fergana) and Construction Supervision Consultant should be initiated immediately, at least by negotiations. 6. The project will need retroactive financing to finance the above consultancy contract, PIU staff, civil works (Tashkent Oblast) and any other procurements as agreed in the procurement plan. 7. Record Keeping: The procurement specialist of the PIU would be responsible for maintaining of the procurement files/records. Separate files should be maintained for each contract (including both hard copy and electronic copy). All the procurement documents (including bids, technical and financial proposals of consulting services) should be kept to the end of the project and then transferred to the Government Archives. The originals of various valuable documents (such as bid security, performance guarantee, advance guarantee) are being kept in the safe by the PIU’s accountant. 8. Procurement Supervision and Procurement Post Review: Routine procurement reviews and supervision support will be provided by the procurement specialist based in the region/country office. In addition, two supervision missions are 2 expected to take place per year during which ex-post reviews will be conducted for the contracts that are not subject to Bank prior review on a sample basis (e.g., 20 percent in terms of number of contracts). One ex-post review report will be prepared per fiscal year, including findings of physical inspections for not less than 10 percent of the contracts awarded during the review period. (vii) Disclosure: The following documents shall be disclosed in the RRF website: (i) procurement plan with estimated cost and updates, (ii) invitation for bids for goods and works for all ICB and NCB contracts, (iii) request for expression of interest for selection/hiring of consulting services, (iv) contract awards of goods and works procured following ICB/NCB procedures, (v) list of contracts/purchase orders placed following shopping procedure on quarterly basis, (vi) short list of consultants, (vii) contract award of all consultancy services, list of contracts following DC or CQS or SSS on a quarterly basis, (ix) Monthly physical and financial progress of all contracts and (x) action taken report on the complaints received on a quarterly basis. The works bidding documents shall include a clause to put up a notice board in the construction site disclosing the contract details (description, contractor name and contract amount, starting date, completion date, physical progress and financial progress). 9. The following details shall be sent to the Bank for publishing in the Bank’s external website and UNDB: (a) invitation for bids for procurement of goods and works using ICB procedures, (b) request for expression of interest for consulting services with estimated cost more than $ 300,000, (c) contract award details of all procurement of goods and works using ICB procedure, (d) contract award details of all consultancy services with estimated cost more than $300,000, and (e) list of contracts/purchase orders placed following SSS or CQS or DC procedures on a quarterly basis. 10. Procurement Planning: RRF has developed the Procurement Plan (see the summary below) covering procurement activities for the entire period of project implementation. This Procurement Plan will be continuously updated as the Project progresses and will be reviewed and approved by the Bank accordingly. The Procurement Plan will be published on the Bank’s external website and Road Fund website by the time of Project negotiations. The General Procurement Notice (GPN) and advertisement of procurement opportunities will be published on the PIU’s website and Uzbek media. The ICBs and major consultancy services will also be published in the Bank’s external website and UN development business. The Recipient has the option of not disclosing the cost estimates while disclosing the procurement plan. 11. The items to be procured would include the followings: (i) Procurement of Works: There will be two packages for (i) Rehabilitation of the Regional Roads in Tashkent Oblast and (ii) Rehabilitation of the Regional Roads in Andijan, Ferghana and Namangan Oblasts with up to five lots following the pre-qualification (PQ) process. There will two PQ process, one for Tashkent and another for Andijan, Ferghana and Namangan Oblasts. (ii) Procurement of Goods: Goods procured under the project would include (a) road safety equipment; (b) equipment for traffic surveys, road inventory. These goods will be procured following ICB procedures. Small value equipment like vehicles, office equipment, etc. would be purchased through Shopping. 3 (iii) The Bank’s latest Standard Bidding Documents (SBDs) for Goods and works including Standard PQD for works shall be used for procurement of goods and works following ICB procedure. Domestic preference according to the Procurement Guidelines will apply to goods contracts only. (iv) Consulting Services: The major consulting services would include: (a) Construction Supervision Consultant; (b) TA to the Road Fund: (c) Road Sector Financing and Governance Review; (d) Road Safety Improvement and (e) Road Asset Management System and (f) financial audit. The Standards RFP will be used. Procurement Plan: Major Works and Goods Description Estimate Date of of Procurem WB Date Contract d Cost ent Draft Procuremen Review Signatur (US$ Method BD to t (Prior/Post e equivale ) WB 1. Rehabilitation nt) 24 and maintenance ICB Septembe April 25, of regional roads 37,500,00 Prior followi r 1, 2016 in Tashkent 0 ng PQ 2015 oblast (90 km) 2. Rehabilitation and maintenance of regional roads ICB Septembe 127,080,0 Prior May 5, in Andijan, followi r 10, 00 2017 Ferghana and ng PQ 2016 Namangan 3. Road (around oblasts Rehabilitation 300 km) and Maintenance – three lots Programing Tools (Supply & Install) March 16, Novemb Equipment for 3,250,000 ICB Prior 2016 er 16, traffic surveys, 2015 road inventory, road inspections, laboratory quality control and testing. Procurement Plan: Major Consultancy Services Est. WB Draft RFP Date of Cost Procurem Review (incl. Contract Description (US$ ent (Prior/ ToR, Completi equivale Method Post) Short on nt) List) to Construction September WB Septembe Supervision 7,000,00 QCB Prior 2015 r 30, 0 S 2021 4 Review road asset management, develop regional roads rehabilitation program, review road sector 1,750,0 QCB Prior September Septembe governance, support 00 S 2015 r 30, road construction 2021 industry, strengthen September Septembe RRF capacity. Core Team 500,000 QCB Prior 2015 r 30, Consultants S 2021 December, Septembe Financial Audits LCS Prior 200,000 2015 r 30, 2021 Thresholds for procurement methods and Bank’s prior review: Expendit Contract Procurement Contracts Subjects ure Value Method to Prior Review Categor Threshold (US$) >=1,000,000 (US$) ICB All ICB contracts y Goods (including < 1,000,000 NC First 2 NCB contracts technical <100,000 B Shopping First 1 contract services) NA DC* SSS contracts >=20,000 >=5,000,000 * ICB All ICB contracts First 2 contracts and Works <5,000,000 NC contracts estimated to B cost>=1,000,000 <500,000 Shopping First 1 contract NA DC/SSS** SSS contracts >=30,000 Irrespective QCBS, QBS, All contracts above of Value FBS, LCS, >=300,000 for firms plus Consultant NA CQS* SSS the first CQS contract Services ** regardless of value; and (including NA IC all contracts >=50,000 training) for individuals; and all SSS contracts. Notes: (a) Shortlist may consist of only national consultants for assignments of less than US$300,000 equivalent per contract. (b) *As appropriate, CQS may be adopted for assignments costing less than $300,000. All negotiations with lowest bidder, cancellation of procurement, selection process and/or re-bidding shall be subject to prior review. ** - to be reflected and agreed in the procurement plan in advance. ICB - International Competitive Bidding NCB - National Competitive Bidding DC - Direct Contracting QCBS - Quality and Cost Based Selection QBS - Quality Based Selection LCS - Least Cost Selection FBS – Fixed Budget Selection CQS - Selection Based on Consultants’ Qualifications SSS - Single Source Selection 5 12. It has been agreed that if a particular invitation for bid comprises several packages, lots or slices, that are included in the same invitation for bid, then the aggregate value of the whole package determines the applicable threshold amount for procurement and also for the review by the Bank. The NCB conditions will be part of Credit Agreement as an Annex 1 to the Schedule. 6 PROCUREMENT Uzbekistan : Regional Roads Development Project PLAN General Information Country: Uzbekistan 2018-03-30 Bank’s Approval Date of the Original Procurement Plan: 2024-01-24 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P146334 GPN Date: Project Name: Regional Roads Development Project Loan / Credit No: IDA / 56790 Republican Road Fund under the Cabinet of Ministers Executing Agency(ies): WORKS Activity Reference No. / Procureme Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH Ri Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method nt Docume ount (US$ and Recommendation Signed Contract o. h cess (Y/N) sk atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion nt Type ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UZ-RRFCM-61786-CW-RFB / Rehabilitation of Regional Ro Open - Internationa Single Stage - One E 19,079,019. 2020-07-0 Rehabilitation of Regional Ro IDA / 56790 Prior Request for Bids Signed 2018-07-17 2019-01-25 2018-08-03 2019-05-08 2018-10-02 2019-05-20 2018-11-01 2019-09-23 2018-12-31 2019-10-26 ads l nvelope 58 1 ads in Tashkent Region UZ-RRFCM-61810-CW-RFB / Rehabilitation of Regional Ro Open - Internationa Single Stage - One E 19,514,841. 2020-09-1 Rehabilitation of Regional Ro IDA / 56790 Prior Request for Bids Signed 2018-09-30 2018-08-01 2018-10-18 2018-08-17 2018-12-17 2018-10-02 2019-01-16 2019-04-09 2019-03-17 2019-06-20 ads l nvelope 21 5 ads in Andijan Region UZ-RRFCM-61901-CW-RFB / Rehabilitation of Regional Ro Open - Internationa Single Stage - One E 7,995,686.7 2020-09-1 Rehabilitation of Regional Ro IDA / 56790 Prior Request for Bids Signed 2018-09-30 2018-08-02 2018-10-18 2018-08-17 2018-12-17 2018-10-02 2019-01-16 2019-07-22 2019-03-17 2019-08-05 ads l nvelope 3 5 ads in ferghana Regions UZ-RRFCM-61905-CW-RFB / Rehabilitation of Regional Ro Open - Internationa Single Stage - One E 43,736,422. Under Revie 2021-01-2 Rehabilitation of Reginal Roa IDA / 56790 Prior Request for Bids 2019-02-15 2018-09-04 2019-03-03 2018-09-12 2019-05-02 2018-11-02 2019-06-01 2019-04-11 2019-07-31 2019-07-09 ads l nvelope 29 w 9 ds in Namangan Region Request for B RRDP/CWP-5 / Rehabilitation ids - Works – of additional sections of Regi Rehabilitation of Regional Ro Open - Internationa Single Stage - One E Roads (Outp 52,411,993. 2022-05-1 IDA / 56790 Prior Request for Bids Signed 2021-07-30 2021-10-29 2021-08-04 2021-12-14 2021-09-15 2022-02-25 2021-10-15 2022-09-26 2021-11-19 2022-10-09 onal Roads in Tashkent regio ads l nvelope ut and Perfor 10 8 n for RRD project savings. mance Based Road Contrac ts) SPD GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UZ-RRFCM-61912-GO-RFB / Supply of equipment for the Scientific Research Institute Road Sector Institutional Str Open - Internationa Single Stage - One E on Automobile Roads and RR IDA / 56790 Prior Request for Bids 701,381.30 Signed 2019-01-31 2020-01-10 2019-03-17 2020-01-14 2019-05-16 2020-02-26 2019-06-15 2021-03-01 2019-08-14 2020-09-20 2021-02-12 2021-07-18 engthening l nvelope F. Automatic traffic counters, road condition surveys and in ventory, works quility control equipment UZ-RRFCM-194134-GO-RFB / Procurement of equipment fo r Scientific Research Institute Road Sector Institutional Str Open - Internationa Single Stage - One E on SUE “UZYO’LLOYIHA” suc IDA / 56790 Prior Request for Bids 1,044,000.00 Signed 2020-09-30 2020-11-25 2020-10-05 2020-11-30 2020-11-16 2021-01-15 2020-12-16 2021-04-20 2021-01-20 2021-06-19 2021-07-19 engthening l nvelope h as mobile traffic counters, WIMS, road scanning survey vehicle, pavement condition survey vehicles UZ-RRFCM-233034-GO-RFB / Procurement of pavement co Road Sector Institutional Str Open - Internationa Single Stage - One E IDA / 56790 Post Request for Bids 1,395,000.00 Signed 2021-05-20 2021-07-08 2021-05-25 2021-07-08 2021-07-06 2021-09-07 2021-08-05 2021-11-19 2021-09-09 2021-12-27 2022-03-08 ndition survey equipment for engthening l nvelope SUE "Uzyulloyiha" UZ-RRFCM-262944-GO-RFB / Road Sector Institutional Str Open - Internationa Single Stage - One E Procurement of Road Scanne IDA / 56790 Post Request for Bids 0.00 Signed 2021-11-24 2021-12-21 2021-11-29 2021-12-21 2022-01-10 2022-02-10 2022-02-09 2022-03-30 2022-03-16 2022-11-04 2022-07-14 engthening l nvelope rs for SUE "Uzyulloyiha" NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UZ-RRFCM-57295-CS-LCS / C osultant Services for project Least Cost Selecti IDA / 56790 Project Management Prior Open - National 23,680.00 Signed 2017-10-24 2018-04-24 2017-11-22 2018-01-23 2018-03-04 2018-03-08 2018-05-01 2018-03-30 2018-05-01 2018-04-04 2018-04-19 2020-06-30 Audit. on (Total budget as per RFP - 30 000 dollars) UZ-RRFCM-61706-CS-QCBS / Rehabilitation of Regional Ro Quality And Cost- Open - Internationa Supervision Consultants: Sup IDA / 56790 Prior 4,503,670.00 Signed 2018-08-01 2018-08-03 2018-08-01 2018-08-17 2018-09-30 2018-12-03 2018-10-30 2019-01-30 2018-11-29 2019-05-06 2018-12-29 2019-06-10 2019-01-27 2019-06-27 2021-01-26 ads Based Selection l ervision of civil work in Ferga na Valley UZ-RRFCM-61773-CS-QCBS / Quality And Cost- Open - Internationa Supervision consultants: sup IDA / 56790 Project Management Prior 2,762,292.85 Signed 2016-03-06 2018-08-17 2016-03-06 2016-09-20 2018-08-20 2016-11-03 2017-01-11 2018-08-23 2017-04-04 2018-08-24 2018-05-31 2018-05-29 2020-05-30 Based Selection l ervision of civil works in Tash kent region UZ-RRFCM-61971-CS-QCBS / Consulting Service: Road sec tor governance review. Supp ort to road construction indu Road Sector Institutional Str Quality And Cost- Open - Internationa IDA / 56790 Prior 1,930,000.00 Signed 2019-01-31 2019-10-27 2019-01-31 2019-11-14 2019-04-01 2020-04-09 2019-05-01 2020-07-22 2019-06-15 2020-09-25 2019-06-30 2020-10-12 2019-07-29 2020-12-02 2021-05-29 stry, including development engthening Based Selection l of regulatory framework and design standards in the road sector, improvement of tech nical capacity of scietific rese arch. UZ-RRFCM-150663-CS-CQS / Consultant Qualifi Project Management, a core t IDA / 56790 Project Management Post Open - National 0.00 Canceled 2019-12-17 2020-01-07 2020-02-20 2020-03-21 2020-04-25 2020-10-22 cation Selection eam of consultants (CTC) Page 1 UZ-RRFCM-199290-CS-QCBS / Pre-Investment Study to Up Quality And Cost- Open - Internationa grade the Tashkent to Andija IDA / 56790 Project Management Prior 4,652,199.00 Signed 2020-10-22 2020-10-28 2020-11-12 2020-11-11 2020-12-26 2021-05-17 2021-01-23 2021-09-07 2021-02-22 2022-05-07 2021-03-29 2022-06-26 2021-05-03 2022-08-09 2022-05-03 Based Selection l n Road to Expressway Stand ards Using an Appropriate PP P Model RFDP/CS-2/2021 / Consultati ve services on technical supe Rehabilitation of Regional Ro Quality And Cost- Open - Internationa IDA / 56790 Prior 0.00 Signed 2021-07-26 2021-11-29 2021-08-16 2022-04-22 2021-09-29 2022-09-06 2021-10-27 2022-10-18 2021-11-26 2022-12-29 2021-12-31 2023-01-25 2022-02-04 2023-02-03 2023-02-04 rision of additional road cons ads Based Selection l truction works in Tashkent re gion. UZ-RRFCM-232960-CS-QCBS / Preparation a Transport sec Road Sector Institutional Str Quality And Cost- Open - Internationa IDA / 56790 Prior 0.00 Canceled 2022-07-10 2022-07-31 2022-09-08 2022-10-06 2022-10-31 2022-11-21 2022-12-26 2023-12-26 tor Development Master-Plan engthening Based Selection l of Republic of Uzbekistan UZ-RRFCM-232974-CS-CQS / Rehabilitation of Regional Ro Consultant Qualifi Open - Internationa Consulting services for Road IDA / 56790 Post 0.00 Canceled 2022-07-20 2022-06-01 2022-08-10 2022-06-10 2022-09-23 2022-10-23 2022-11-27 2023-05-26 ads cation Selection l Safety Audit of regional road s UZ-RRFCM-299203-CS-CQS / Consultant service for constr uction supervision for Region Rehabilitation of Regional Ro Consultant Qualifi IDA / 56790 Post Open - National 0.00 Canceled 2022-06-09 2022-06-02 2022-06-23 2022-06-14 2022-08-06 2022-08-08 2022-08-30 2023-02-26 al Road in Tashkent Region, ads cation Selection Phase 2. This is a temporary assignment until the Internat ional consultant will be hired. UZ-RRFCM-298240-CS-CQS / Local consulting companies t hat will be selected in accord Rehabilitation of Regional Ro Consultant Qualifi ance with the WB’s Guideline IDA / 56790 Post Open - National 0.00 Under Review 2022-06-06 2022-05-30 2022-06-20 2022-07-14 2022-07-16 2022-08-07 2023-02-03 ads cation Selection s for the start-up of the work s, for an interim period until t he final international Consult ant firm is mobilised. UZ-RRFCM-372269-CS-CQS / Consultant Qualifi Open - Internationa Pending Impleme Social Safeguards Consultanc IDA / 56790 Project Management Post 0.00 2023-07-30 2023-08-14 2023-09-17 2023-09-27 2023-10-14 2024-04-11 cation Selection l ntation y Services for the M-41 proje ct UZ-RRFCM-372268-CS-CQS / Consultant Qualifi Open - Internationa Pending Impleme Environmental consulting ser IDA / 56790 Project Management Post 0.00 2023-07-30 2023-08-14 2023-09-17 2023-09-27 2023-10-14 2024-04-11 cation Selection l ntation vice foe the M-41 project UZ-RRFCM-381435-CS-CQS / Consultancy services to prep Consultant Qualifi Open - Internationa Under Implement IDA / 56790 Project Management Post 0.00 2023-09-12 2023-09-13 2023-10-03 2023-09-28 2023-11-16 2023-10-12 2023-12-16 2023-10-20 2024-01-20 2024-06-28 are Social Management Fram cation Selection l ation ework and Social Impact Ass essments UZ-RRFCM-381436-CS-CQS / Consultancy services to prep Consultant Qualifi Open - Internationa Under Implement are Environmental Managem IDA / 56790 Project Management Post 0.00 2023-09-12 2023-09-13 2023-10-03 2023-09-28 2023-11-16 2023-10-12 2023-12-16 2023-10-20 2024-01-20 2024-06-28 cation Selection l ation ent Framework and Environm ental Impact Assessments UZ-RRFCM-382891-CS-CQS / Consultant Qualifi Open - Internationa Under Implement Tolling law legislation service IDA / 56790 Project Management Post 0.00 2023-09-25 2023-09-25 2023-10-16 2023-09-28 2023-11-29 2023-10-13 2023-12-29 2023-12-28 2024-02-02 2024-07-31 cation Selection l ation s for the TAR project INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Actual Amount Invitation to Identifie Draft Negotiated Cont Component Review Type Method Contract Type Process Status Teams of Reference Signed Contract Contract Completion Description o. h (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual UZ-RRFCM-56661-CS-INDV / Individual Consult Consultancy Service for posit IDA / 56790 Project Management Prior Open 50,400.00 Signed 2017-09-09 2018-03-18 2018-03-26 2018-05-03 2018-04-02 2018-04-17 2021-09-14 ant Selection ion Project Manager (PIU Dire ctor) UZ-RRFCM-56664-CS-INDV / Individual Consult Consultancy Service for Positi IDA / 56790 Project Management Prior Open 48,300.00 Terminated 2017-09-09 2018-03-18 2018-03-26 2018-05-10 2018-04-02 2018-04-18 2021-09-14 ant Selection on Procurement Specialist UZ-RRFCM-61683-CS-INDV / Individual Consult IDA / 56790 Project Management Prior Open 0.00 Canceled 2018-05-15 2018-07-21 2018-07-12 2018-07-13 2018-07-13 2021-09-30 FM Specialist for Project ant Selection UZ-RRFCM-61686-CS-INDV / Individual Consult IDA / 56790 Project Management Post Open 40,250.00 Signed 2018-05-15 2018-07-12 2018-10-23 2018-07-13 2018-10-24 2018-07-13 2018-11-19 2021-09-30 Monitoring and evaluation Sp ant Selection ecialist UZ-RRFCM-61688-CS-INDV / Individual Consult IDA / 56790 Project Management Post Open 41,000.00 Signed 2018-05-15 2018-07-09 2018-07-12 2018-10-24 2018-07-13 2018-10-25 2018-07-13 2018-11-19 2021-09-30 Bridge engineer for Project ant Selection UZ-RRFCM-61693-CS-INDV / Individual Consult IDA / 56790 Project Management Post Open 30,060.00 Signed 2018-05-31 2018-07-31 2018-08-01 2018-11-09 2018-08-01 2018-12-01 2021-09-30 CTC-Social Safeguards Speci ant Selection alist UZ-RRFCM-61700-CS-INDV / Individual Consult IDA / 56790 Project Management Post Open 26,360.00 Signed 2018-06-30 2018-08-30 2018-08-31 2018-11-09 2018-08-31 2018-12-01 2021-09-25 Environmental safeguards Sp ant Selection ecialist UZ-RRFCM-61937-CS-INDV / Individual Consult IDA / 56790 Project Management Post Open 48,300.00 Signed 2017-09-09 2018-02-28 2018-02-28 2018-09-05 2018-02-28 2018-04-18 2021-09-30 Road Engineer for PIU ant Selection UZ-RRFCM-61969-CS-INDV / Individual Consult IDA / 56790 Project Management Post Open 48,300.00 Signed 2017-09-09 2018-02-28 2018-02-28 2018-04-04 2018-02-28 2018-04-14 2021-09-30 Accounting Specialist for PIU ant Selection UZ-RRFCM-79888-CS-INDV / Rehabilitation of Regional Ro Individual Consult IDA / 56790 Prior Open 38,500.00 Signed 2018-10-02 2018-10-09 2018-10-24 2018-10-30 2018-10-29 2018-11-05 2018-11-01 2018-11-07 2021-09-30 procurement and contract su ads ant Selection pervision UZ-RRFCM-111486-CS-INDV Individual Consult / Consultancy Services with S IDA / 56790 Project Management Post Limited 22,430.00 Signed 2018-05-31 2018-09-20 2019-04-04 2019-04-04 2019-04-08 2019-04-08 2019-04-10 2019-04-30 2021-09-30 ant Selection ocial Safeguards Specialist UZ-RRFCM-337823-CS-CDS / Consultant Services for the FI DIC Contracts training course Road Sector Institutional Str IDA / 56790 Post Direct Selection Direct - National 0.00 Completed 2023-02-13 2023-02-28 2023-02-23 2023-03-25 2023-04-12 2023-04-12 2023-08-10 2023-09-06 for the Inspectorate for qualit engthening y control of road construction works under the Ministry of T ransport Page 2 UZ-RRFCM-364301-CS-CDS / Transaction Advisory for upgr Road Sector Institutional Str Direct - Internation ading the Tashkent to Andija IDA / 56790 Prior Direct Selection 0.00 Canceled 2023-06-13 2023-07-08 2023-09-11 2024-12-31 engthening al n road to expressway standa rds using an appropriate PPP Model UZ-RRFCM-404355-CS-CDS / FIDIC training consultancy se Pending Impleme IDA / 56790 Project Management Post Direct Selection Direct - National 0.00 2024-01-31 2024-02-10 2024-04-15 2024-10-12 rvices for the specialists of th ntation e Road Committee's regional departments Page 3