PROCUREMENT PLAN (Textual Part) Project information: Sao Tome and Principe - WACA Resilience Investment Project - P162337 Project Implementation agency: Ministry of Public Works and Natural Resources, Directorate General of Environment Date of the Procurement Plan: July 2017 Period covered by this Procurement Plan: July 1st 2017 to June 30th, 2018 Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. When the Borrower uses its own national open competitive procurement arrangements as set forth in Regulamento de Licitação e Contratações Publicas such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables: Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables: Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is not applicable for those contracts identified in the Procurement Plan tables; Works: is not applicable for those contracts identified in the Procurement Plan tables Other Relevant Procurement Information.: Not Applicable PROCUREMENT Western and Central Africa : West Africa Coastal Areas Resilience Investment Project PLAN General Information Country: Western and Central Africa 2018-01-08 Bank’s Approval Date of the Original Procurement Plan: 2024-01-16 Revised Plan Date(s): (comma delineated, leave blank if none) Project ID: P162337 GPN Date: 2017-12-29 Project Name: West Africa Coastal Areas Resilience Investment Project Loan / Credit No: IDA / V1160, IDA / 62140, TF / A7131, IDA / D2870, IDA / D8470 GENERAL DIRECTORATE FOR ENVIRONMENT AND CLIMATE Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned BJ-WACA -44429-CW-RFQ / T ravaux d'amenagement, de c Component 4: National Coor Single Stage - One E En cours d'e 2018-05-2 loisonnement de bureaux et IDA / V1160 A posteriori Demande de prix Limited 140,000.00 0.00 2018-02-10 2018-09-07 2018-04-05 dination nvelope xécution 0 de realisation de plaquettes d'identification des bureaux BJ-WACA -103686-CW-RFQ / Component 3: Strengthening Single Stage - One E En attente d 2019-12-1 Réhabiliter/aménager la mar TF / A7131 National Physical and Social A posteriori Demande de prix Limited 50,000.00 0.00 2019-04-20 2019-06-15 nvelope 'exécution 2 e aux crocodiles de Tannou ( Investments Aplahoué) BJ-WACA -95485-CW-RFQ / R Component 3: Strengthening éaliser les travaux de matéri Single Stage - One E En attente d 2019-08-3 TF / A7131 National Physical and Social A posteriori Demande de prix Limited 120,000.00 0.00 2019-05-07 2019-07-02 alisation naturelle (plantation nvelope 'exécution 1 Investments de haies) des limites des ACC B BJ-WACA -95488-CW-RFQ / T ravaux de construction d'infr Component 3: Strengthening Single Stage - One E En cours d'e 2020-02-1 astructures (bâtiments serva TF / A7131 National Physical and Social A posteriori Demande de prix Limited 140,000.00 0.00 2019-06-22 2019-08-17 nvelope xécution 3 nt de siège) au profit des ass Investments ociations de gestion des ACC B BJ-WACA -117475-CW-DIR / Travaux d'urgence de dragag Component 3: Strengthening Passation de marc En cours d'e 2020-01-1 e et du refoulement des sédi IDA / 62140 National Physical and Social A posteriori Direct 800,000.00 0.00 2019-06-05 2019-06-28 2019-06-10 2019-07-15 hé de gré à gré xécution 1 ments dans la berge sud du f Investments leuve Mono à Grand Popo BJ-WACA -125526-CW-RFQ / Component 3: Strengthening Single Stage - One E En attente d 2020-04-0 Travaux de sécurisation de la TF / A7131 National Physical and Social A posteriori Demande de prix Limited 40,000.00 0.00 2019-08-17 2019-10-12 nvelope 'exécution 9 mare aux crocodiles de Tann Investments ou BJ-WACA -125527-CW-RFQ / Component 3: Strengthening Travaux de réalisation de cin Single Stage - One E En attente d 2020-04-0 TF / A7131 National Physical and Social A posteriori Demande de prix Limited 80,000.00 0.00 2019-08-17 2019-10-12 q (05) forages aux profits des nvelope 'exécution 9 Investments populations de Tannou BJ-WACA -165331-CW-RFB / Component 2: Strengthening Single Stage - One E En attente d 2020-12-2 Travaux de réhabilitation du IDA / 62140 the Policy and Institutional F A posteriori Appel d'offres Open - National 270,000.00 0.00 2020-03-27 2020-04-01 2020-05-01 2020-05-15 2020-06-26 nvelope 'exécution 3 bâtiment annexe de l'ABE à P ramework arakou BJ-WACA -209754-CW-RFB / Component 3: Strengthening Open - Internationa Single Stage - One E 110,000,000. 62,526,097. 2022-12-1 Travaux de protection à long IDA / 62140 National Physical and Social A priori Appel d'offres Signé 2020-12-17 2021-01-15 2020-12-31 2021-03-19 2021-02-11 2021-04-08 2021-03-03 2021-09-15 2021-04-21 2021-12-31 l nvelope 00 27 2 terme de la côte transfrontali Investments ère Bénin Togo Demande de cota BJ-WACA -234923-CW-RFQ / Component 3: Strengthening tions - DTPM Petit Ouverture des pistes d'accès Single Stage - One E En attente d 2021-12-2 TF / A7131 National Physical and Social A posteriori Demande de prix Limited s travaux (urgenc 17,000.00 0.00 2021-08-04 2021-09-23 vers les aires centrales des A nvelope 'exécution 2 Investments e) - Avec compéti CCB Adjamé, Lac Toho et Na tion glanou BJ-WACA -262578-CW-DIR / Travaux d’urgence d’endigue Demande de cota ment du cordon de plage du Component 3: Strengthening tions - DTPM Petit segment de cote Sanvée-Cod Passation de marc En attente d 2022-01-1 IDA / 62140 National Physical and Social A posteriori Direct s travaux (urgenc 50,000.00 0.00 2021-11-10 2021-11-12 2021-11-18 ji – Hillacondji et travaux d’a hé de gré à gré 'exécution 7 Investments e) - Sans compétit ménagement des sites au pr ion ofit des sinistres des risques d’inondations des berges de l a lagune morte de la ville d’H illacondji BJ-WACA -387643-CW-RFQ / Demande de cota Travaux de construction de tr Component 3: Strengthening tions - DTPM Petit Single Stage - One E En attente d 2024-05-0 ois (03) foyers de fumage, pa IDA / D8470 National Physical and Social A posteriori Demande de prix Limited s travaux (urgenc 40,000.00 0.00 2024-01-10 2024-03-09 nvelope 'exécution 8 illotte et clôture au profit des Investments e) - Avec compéti mareyeuses de Grand Popo d tion ans le cadre du PRMS GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -35451-GO-RFQ / A Component 6: National Coor Single Stage - One E En cours d'ex cquisition de fourniture de bu IDA / V1160 A posteriori Demande de prix Limited 20,000.00 0.00 2017-11-15 2018-01-05 2018-01-08 2018-01-28 dination nvelope écution reaux et de consommables in formatiques BJ-WACA -35464-GO-RFQ / A cquisition d'un logiciel de ges Component 6: National Coor Single Stage - One E En attente d' tion comptable, financière et IDA / V1160 A posteriori Demande de prix Limited 25,000.00 0.00 2017-11-15 2017-12-28 2018-12-28 dination nvelope exécution de passation de marché et as sistance à l'utilisation du logi ciel BJ-WACA -44426-GO-RFQ / A Component 4: National Coor Single Stage - One E En attente d' cquisition d'un vehicule pick IDA / V1160 A posteriori Demande de prix Limited 54,000.00 0.00 2018-03-01 2018-04-26 2018-07-25 dination nvelope exécution up 4x4 double cabine au prof it du projet BJ-WACA -44423-GO-RFQ / F ourniture, installation et mise Component 4: National Coor Single Stage - One E En attente d' IDA / V1160 A posteriori Demande de prix Limited 30,000.00 0.00 2018-02-08 2018-04-05 2018-05-05 en service d'un groupe electr dination nvelope exécution ogene insonorise de 100KVA avec inverseur BJ-WACA -44425-GO-RFQ / A Component 4: National Coor Single Stage - One E En attente d' cquisition de mobiliers de bu IDA / V1160 A posteriori Demande de prix Limited 40,000.00 0.00 2018-02-09 2018-04-04 2018-05-04 dination nvelope exécution reau au profit du projet Page 1 BJ-WACA -44424-GO-RFQ / A cquisition d'équipements et d Component 2: Strengthening Single Stage - One E En cours d'ex e logiciel pour l'opérationnali IDA / V1160 the Policy and Institutional F A posteriori Demande de prix Limited 76,000.00 0.00 2018-02-26 2022-11-04 2018-04-23 2018-10-20 nvelope écution sation du système géographi ramework que de l'information environn ementale BJ-WACA -52702-GO-RFQ / A Component 4: National Coor Single Stage - One E cquisition de matériels infor IDA / V1160 A posteriori Demande de prix Limited 40,000.00 35,234.93 Signé 2018-03-13 2018-01-03 2018-05-08 2018-05-18 2018-06-07 dination nvelope matiques au profit du projet BJ-WACA -83177-GO-RFQ / A cquisition de fournitures de b Component 4: National Coor Single Stage - One E En attente d' IDA / D2870 A posteriori Demande de prix Limited 30,000.00 0.00 2018-12-02 2019-01-27 2019-02-26 ureau et de consommables i dination nvelope exécution nformatiques au profit du pro jet BJ-WACA -83182-GO-RFQ / A cquisition de matériels et éq Component 4: National Coor Single Stage - One E En attente d' uipements (Audio Visioconfér IDA / D2870 A posteriori Demande de prix Limited 30,000.00 0.00 2018-12-02 2019-01-27 2019-02-26 dination nvelope exécution ence, Copieur, Digital Sender , armoires de rangement) de bureau au profit du projet BJ-WACA -83163-GO-RFQ / A cquisition d'équipements tec Component 2: Strengthening hniques (Serveur, Drônes, GP Passation de marc En attente d' IDA / 62140 the Policy and Institutional F A posteriori Direct 80,000.00 0.00 2018-12-09 2018-12-14 2019-01-18 2019-07-17 D,...) pour l'opérationnalisati hé de gré à gré exécution ramework on du système géographique de l'information environneme ntale BJ-WACA -83189-GO-RFQ / A Component 4: National Coor Passation de marc En attente d' cquisition et mise en service IDA / D2870 A posteriori Direct 20,000.00 0.00 2018-12-16 2018-12-21 2019-01-25 2019-03-26 dination hé de gré à gré exécution d'un logiciel de suivi & Evalu ation BJ-WACA -83175-GO-RFQ / A Component 2: Strengthening cquisition de matériels roula Single Stage - One E IDA / D2870 the Policy and Institutional F A posteriori Demande de prix Limited 480,000.00 134,331.80 Signé 2018-12-21 2019-07-04 2019-02-15 2020-01-18 2019-08-14 nts (véhicules et motos) au p nvelope ramework rofit du Projet Waca et de l'A BE BJ-WACA -83180-GO-RFQ / A cquisition de barques motori Component 2: Strengthening Single Stage - One E En cours d'ex sées, et des pirogues pour ap TF / A7131 the Policy and Institutional F A posteriori Demande de prix Limited 95,000.00 0.00 2018-12-14 2021-01-13 2019-02-08 2019-05-09 nvelope écution puyer la mise en œuvre du p ramework rojet à Grand-Popo, Avlo, Djè gbadji et Toho. BJ-WACA -95500-GO-RFQ / E dition et multiplication de do cuments (lignes directrices p Component 2: Strengthening our les EIE, la planification sp Single Stage - One E En attente d' IDA / 62140 the Policy and Institutional F A posteriori Demande de prix Limited 60,000.00 0.00 2019-02-25 2019-04-22 2019-06-21 atiale de la zone côtière et le nvelope exécution ramework s infrastructures, document d e stratégie sectorielle relativ e à la zone côtière et les text es d'application de la loi littor ale) BJ-WACA -83174-GO-RFQ / A Component 2: Strengthening cquisition de logiciel pour l'o Passation de marc En attente d' IDA / 62140 the Policy and Institutional F A posteriori Direct 20,000.00 0.00 2019-05-02 2019-05-07 2019-06-11 2019-08-10 pérationnalisation du systèm hé de gré à gré exécution ramework e géographique de l'informati on environnementale BJ-WACA -83176-GO-RFQ / A cquisition d'équipements tec hniques de suivi des indicate Component 2: Strengthening urs biologiques et de pollutio Passation de marc En attente d' IDA / 62140 the Policy and Institutional F A posteriori Direct 360,000.00 0.00 2019-05-15 2019-05-20 2019-06-24 2019-12-21 n (Indicateurs chimiques et b hé de gré à gré exécution ramework iologiques, mallettes d'indica teurs, indicateurs de stérilisa tion, ...) au profit de l'observ ation de suivi de l'environne ment BJ-WACA -95501-GO-RFB / A cquisition d'équipements info rmatiques (ordinateurs, impri mantes, photocopieurs, etc.) Component 2: Strengthening Single Stage - One E En attente d' au profit de l'ABE pour assur IDA / 62140 the Policy and Institutional F A posteriori Appel d'offres Open - National 420,000.00 0.00 2019-05-06 2019-05-11 2019-06-22 2019-07-22 2019-08-26 2020-02-22 nvelope exécution er un suivi des impacts envir ramework onnementaux et le suivi de l a mise en œuvre des plans d' aménagement des ACCB et d es AaGRs par les communes BJ-WACA -129162-GO-RFQ / Fourniture et installation de Component 4: National Coor Single Stage - One E En cours d'ex IDA / 62140 A posteriori Demande de prix Limited 14,000.00 0.00 2019-09-04 2019-10-28 2019-11-12 bureaux incubateurs (Cubecl dination nvelope écution es) dans les deux bâtiments de l'UIGP BJ-WACA -129254-GO-RFQ / Component 4: National Coor Fourniture et installation de IDA / 62140 A posteriori Demande de prix 19,500.00 16,672.25 Signé 2019-09-11 2019-09-05 2019-11-04 2019-11-20 2019-11-19 dination mobiliers de bureau au profit de l'UIGP BJ-WACA -165341-GO-RFQ / Component 2: Strengthening Fourniture et instalation des Single Stage - One E En attente d' IDA / 62140 the Policy and Institutional F A posteriori Demande de prix Limited 60,000.00 0.00 2020-05-27 2020-07-19 2020-09-17 mobiliers (bureau, chaises, m nvelope exécution ramework eubles de rangement) au pro fit de l'ABE BJ-WACA -165324-GO-UN / A Component 2: Strengthening Passation de marc cquisition de matériels roula En attente d' IDA / D2870 the Policy and Institutional F A posteriori hés auprès des ag Direct 110,000.00 0.00 2020-05-20 2020-05-25 2020-06-11 2020-08-10 nts au profit de l'UIGP et de l' exécution ramework ences de l'ONU ABE (Deux véhicules station Wagon) BJ-WACA -209769-GO-RFQ / Fourniture et installation de Component 4: National Coor Single Stage - One E En attente d' IDA / 62140 A posteriori Demande de prix Limited 60,000.00 0.00 2020-12-29 2021-02-23 2021-04-24 matériels informatiques (ordi dination nvelope exécution nateurs) pour l’UIGP, les CET AFs et la DGHC BJ-WACA -238127-GO-RFQ / Fourniture et installation des bornes, plaques et drapeaux Component 3: Strengthening d'indication pour matérialiser Single Stage - One E En attente d' TF / A7131 National Physical and Social A posteriori Demande de prix Limited 16,000.00 0.00 2021-07-03 2021-09-04 2021-10-19 les sites sacrés de divinités nvelope exécution Investments des ACCB de TOHO, NAGLAN OU, bouche du Roy et les circ uits écotouristiques de l'ACC B Lac Toho BJ-WACA -325223-GO-RFQ / Fourniture, installation et mis Component 2: Strengthening e en service de deux (02) pla Single Stage - One E En cours d'ex IDA / 62140 the Policy and Institutional F A posteriori Demande de prix Limited 95,000.00 0.00 2022-12-01 2023-01-30 2023-01-26 2023-02-25 teformes de visioconférence nvelope écution ramework au profit de l’Agence Béninoi se pour l’Environnement (AB E) à Cotonou et Parakou Page 2 BJ-WACA -344253-GO-RFQ / Acquisition de matériels infor matiques (ordinateurs, impri Component 2: Strengthening Single Stage - One E En attente d' mantes, etc,) au profit des in TF / A7131 the Policy and Institutional F A posteriori Demande de prix Limited 19,000.00 0.00 2023-04-13 2023-06-05 2023-07-20 nvelope exécution stitutions centrales, déconce ramework ntrées et décentralisées (DD CVDD Mono Couffo, DGEC, C ENAGREF) BJ-WACA -344256-GO-RFQ / Acquisition de mobilier de bu Component 2: Strengthening reau au profit des institution Single Stage - One E En attente d' IDA / V1160 the Policy and Institutional F A posteriori Demande de prix Limited 60,000.00 0.00 2023-04-07 2023-06-02 2023-07-17 s centrales, déconcentrées et nvelope exécution ramework décentralisées (DDCVDD Mo no Couffo, DGEC, CENAGREF, 11 Mairies, 6 ACCB) BJ-WACA -387529-GO-RFQ / Component 2: Strengthening Fourniture et installation des Single Stage - One E En attente d' TF / A7131 the Policy and Institutional F A posteriori Demande de prix Limited 19,000.00 0.00 2023-12-30 2024-02-17 2024-04-17 panneaux de matérialisation nvelope exécution ramework des différentes zones des AC CB (délimitation) NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -44428-NC-RFQ / A cquisition d'equipement pour Component 4: National Coor Single Stage - One E En cours d'ex le cablage internet, abonne IDA / V1160 A posteriori Demande de prix Limited 65,000.00 0.00 2018-02-20 2018-07-17 2018-04-17 2018-06-01 dination nvelope écution ment et mise en place du re seau intranet dans les locaux de l'UGP BJ-WACA -82969-NC-RFQ / R ecrutement d'une agence de Component 4: National Coor Single Stage - One E En attente d' IDA / D2870 A posteriori Demande de prix Limited 12,000.00 0.00 2018-12-14 2019-02-08 2020-02-08 gardiennage pour la surveilla dination nvelope exécution nce des bureaux du siège du projet WACA BJ-WACA -95492-NC-RFQ / S Component 4: National Coor Single Stage - One E En attente d' élection d'un prestataire pou IDA / 62140 A posteriori Demande de prix Limited 5,000.00 0.00 2019-02-09 2019-04-06 2020-04-05 dination nvelope exécution r la maintenance des climatis eurs BJ-WACA -95494-NC-RFQ / A Component 4: National Coor Single Stage - One E ssurance Santé du personnel IDA / 62140 A posteriori Demande de prix Limited 40,000.00 25,286.74 Signé 2019-02-16 2020-01-13 2019-04-13 2020-03-22 2020-04-12 dination nvelope du projet WACA ResIP-Bénin BJ-WACA -95498-NC-RFQ / M Component 4: National Coor Single Stage - One E En attente d' aintenance des matériels info IDA / 62140 A posteriori Demande de prix Limited 10,000.00 0.00 2019-02-25 2019-04-22 2020-04-21 dination nvelope exécution rmatiques et électriques BJ-WACA -95496-NC-RFQ / A ssurance santé du personnel Component 4: National Coor Single Stage - One E En attente d' IDA / 62140 A posteriori Demande de prix Limited 32,000.00 0.00 2019-04-20 2019-06-15 2020-06-14 et assurance des matériels r dination nvelope exécution oulants du projet WACA ResI P-Bénin BJ-WACA -82869-NC-RFQ / R ecruter une agence événeme ntielle et de communication pour la mise en place de la lo Component 3: Strengthening Single Stage - One E En attente d' gistique (bâches, stands, cha TF / A7131 National Physical and Social A posteriori Demande de prix Limited 60,000.00 0.00 2019-06-17 2019-08-12 2019-08-22 nvelope exécution ises, podium, sonorisation, re Investments portage, etc.) dans le cadre du lancement technique du v olet AaGRs sous-financement GEF du projet WACA-Bénin BJ-WACA -114367-NC-RFQ / conception des maquettes d es projets WACA et PFCB (Po Component 4: National Coor Single Stage - One E En attente d' IDA / 62140 A posteriori Demande de prix Limited 3,600.00 0.00 2019-05-17 2019-07-12 2020-07-11 sters, Kakémonos, prospectu dination nvelope exécution s, flyers cartables) pour la jo urnée porte ouverte de la Ba nque Mondiale. BJ-WACA -114368-NC-RFQ / I mpression des support de co mmunication des projets WA Component 4: National Coor Single Stage - One E En attente d' IDA / 62140 A posteriori Demande de prix Limited 3,900.00 0.00 2019-05-17 2019-07-12 2020-07-11 CA et PFCB (Posters, Kakémo dination nvelope exécution nos, prospectus, flyers cartab les) pour les journées porte o uverte de la Banque mondial e. BJ-WACA -151438-CS-CDS / I nspection approfondie sous- Component 3: Strengthening Passation de marc En attente d' marine et de surface des inst TF / A7131 National Physical and Social A posteriori Direct 600,000.00 0.00 2020-01-03 2020-01-08 2020-02-17 2020-03-18 hé de gré à gré exécution allations abandonnées sur le Investments champ pétrolifère de Sèmè a u large du Bénin BJ-WACA -165598-NC-RFB / I nspection approfondie sous- marine et de surface des inst Component 3: Strengthening Open - Internationa Single Stage - One E En cours d'ex allations abandonnées sur le TF / A7131 National Physical and Social A posteriori Appel d'offres 2,000,000.00 0.00 2020-03-31 2020-10-19 2020-04-10 2020-12-15 2020-05-25 2021-01-07 2020-06-09 2021-05-04 2020-07-28 2020-11-25 l nvelope écution champ pétrolifère de Sèmè a Investments u large du Bénin pour l’actual isation de l’étude de faisabilit é du déclassement des instal lations CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -44408-CS-CQS / S Sélection fondée s Component 4: National Coor En cours d'exame election d'un cabinet pour le IDA / V1160 A posteriori ur les qualification Open - National 16,000.00 0.00 2018-01-30 2018-06-28 2018-02-06 2018-03-03 2018-04-02 2018-05-07 2018-06-06 dination n recrutement du personnel cle s des consultants du projet BJ-WACA -82873-CS-LCS / Sé lection d'un consultant pour l a réalisation de l'audit financi Component 4: National Coor Sélection au moin En cours d'exécut IDA / 62140 A posteriori Open - National 60,000.00 0.00 2018-11-15 2022-08-03 2018-12-06 2019-01-19 2019-02-16 2019-03-18 2019-04-22 2019-05-27 2019-06-26 er et comptable de la phase dination dre coût ion de préparation et des exercic es 2018 et 2019 du projet (4, 3,1) Page 3 BJ-WACA -82880-CS-CQS / S élection d'un consultant pour Component 2: Strengthening Sélection fondée s l'élaboration de lignes directr En attente d'exéc IDA / 62140 the Policy and Institutional F A posteriori ur les qualification Open - National 95,000.00 0.00 2018-11-20 2018-12-11 2019-01-24 2019-02-23 2019-03-30 2019-05-29 ices pour des EIE sectorielles ution ramework s des consultants (planification spatiale de la z one côtière, ouvrage de prot ection du littoral etc) BJ-WACA -82882-CS-CQS / R Component 2: Strengthening Sélection fondée s ecrutement d'un consultant p En cours d'exécut IDA / 62140 the Policy and Institutional F A posteriori ur les qualification Open - National 80,000.00 0.00 2018-11-19 2022-08-02 2018-12-10 2023-05-07 2019-01-23 2020-03-06 2019-02-22 2020-05-28 2019-03-29 2019-06-27 our l'élaboration des projets ion ramework s des consultants des textes d'application de la loi sur le littoral BJ-WACA -82891-CS-CQS / R ecrutement d'un consultant p our la réalisation de l'étude p Component 3: Strengthening Sélection fondée s En cours d'exécut our identifier les sites d'inter TF / A7131 National Physical and Social A posteriori ur les qualification Open - National 95,000.00 0.00 2018-11-20 2022-08-02 2018-12-11 2023-11-11 2019-01-24 2019-02-23 2019-03-30 2019-04-29 ion vention du GEF et la faisabilit Investments s des consultants é technique et environnemen tale des investissements à ré aliser BJ-WACA -82899-CS-CQS / R ecrutement d'un consultant p Component 3: Strengthening Sélection fondée s En attente d'exéc our la réalisation de l'étude d TF / A7131 National Physical and Social A posteriori ur les qualification Open - National 95,000.00 0.00 2018-11-19 2018-12-10 2019-01-23 2019-02-22 2019-03-29 2019-04-28 ution 'état des lieux de la plate for Investments s des consultants me pétrolière de Sèmè-Kpodj i BJ-WACA -82978-CS-QCBS / Sélection d'un consultant po Component 2: Strengthening Sélection fondée s ur l'assistance technique pou Open - Internationa En attente d'exéc TF / A7131 the Policy and Institutional F A posteriori ur la qualité et le 291,000.00 0.00 2018-11-20 2018-12-11 2019-01-24 2019-02-21 2019-03-23 2019-04-27 2019-06-01 2019-08-30 r l'élaboration des curicula et l ution ramework coût la mise en œuvre du progra mme de recherche sur la zon e côtière BJ-WACA -83015-CS-QCBS / Sélection d'un consultant po Component 3: Strengthening Sélection fondée s ur la réalisation de l'étude de Open - Internationa En cours d'exécut TF / A7131 National Physical and Social A priori ur la qualité et le 2,000,000.00 0.00 2018-12-03 2019-02-04 2018-12-24 2019-04-04 2019-02-06 2019-09-02 2019-03-06 2019-11-08 2019-04-05 2019-12-06 2019-05-10 2020-02-11 2019-06-14 2019-12-11 faisabilité pour la protection l ion Investments coût à long termes de la zone côti ère transfrontalière entre le Bénin et le Togo BJ-WACA -83025-CS-CQS / Ét Component 3: Strengthening Sélection fondée s ude de référence socio écono En cours d'exécut TF / A7131 National Physical and Social A posteriori ur les qualification Open - National 40,000.00 0.00 2018-10-30 2022-08-03 2018-11-20 2019-01-03 2019-02-02 2019-03-09 2019-06-07 mique des ménages bénéfici ion Investments s des consultants aires des AaGRs BJ-WACA -83322-CS-QCBS / Sélection d'un cabinet pour l Component 3: Strengthening Sélection fondée s a réalisation de l'EIES pour la Open - Internationa En attente d'exéc IDA / D2870 National Physical and Social A posteriori ur la qualité et le 640,000.00 0.00 2019-04-15 2019-05-06 2019-06-19 2019-07-17 2019-08-16 2019-09-20 2019-10-25 2020-02-22 protection à long termes de l l ution Investments coût a zone côtière transfrontalièr e entre le Bénin et le Togo BJ-WACA -95368-CS-QCBS / Recrutement de consultants Component 2: Strengthening Sélection fondée s Open - Internationa En cours d'exécut pour la réalisation de l'évalua IDA / 62140 the Policy and Institutional F A posteriori ur la qualité et le 250,000.00 0.00 2019-02-04 2022-08-18 2019-02-25 2022-10-11 2019-04-10 2019-04-20 2019-05-05 2019-05-30 2019-07-04 2019-10-02 l ion tion environnementale straté ramework coût gique pour la zone côtière BJ-WACA -95377-CS-QCBS / Recrutement d'un Consultant Component 2: Strengthening Sélection fondée s pour le renforcement du syst Open - Internationa En attente d'exéc IDA / 62140 the Policy and Institutional F A posteriori ur la qualité et le 300,000.00 0.00 2019-02-11 2019-02-26 2019-03-18 2019-03-23 2019-04-02 2019-04-17 2019-05-16 2019-08-14 ème informatisé de suivi des l ution ramework coût évaluations environnemental es (Manuel suivi PGES, Dr-PG ES) BJ-WACA -95420-CS-CQS / R ecrutement d'un cabinet pou Component 2: Strengthening Sélection fondée s En cours d'exécut r la réalisation d'une étude m TF / A7131 the Policy and Institutional F A posteriori ur les qualification Open - National 50,000.00 0.00 2019-02-14 2022-08-02 2019-03-01 2019-03-23 2019-04-04 2019-05-09 2019-07-08 ion onographique des ACCB de D ramework s des consultants jègbadji-Avlékété et du Chen al Gbaga BJ-WACA -95430-CS-CQS / R ecrutement d'un cabinet pou Component 2: Strengthening Sélection fondée s En attente d'exéc r l'élaboration des plans de g TF / A7131 the Policy and Institutional F A posteriori ur les qualification Open - National 40,000.00 0.00 2019-02-11 2019-02-26 2019-03-13 2019-03-23 2019-04-27 2019-06-26 ution estion des nouvelles ACCB d ramework s des consultants e Djègbadji-Avlékété et Chen al Gbaga BJ-WACA -95467-CS-CQS / R ecrutement d'un Cabinet pou Component 3: Strengthening Sélection fondée s r la réalisation de l'étude de En cours d'exécut TF / A7131 National Physical and Social A posteriori ur les qualification Open - National 40,000.00 0.00 2019-02-20 2022-08-02 2019-03-07 2023-06-29 2019-03-22 2020-02-04 2019-04-06 2020-04-23 2019-05-05 2019-08-03 cartographie des sites de car ion Investments s des consultants rières de sable et de graviers abandonnés dans la Réserve de Biosphère Transfrontalièr e BJ-WACA -83024-CS-CQS / S Component 3: Strengthening Sélection dans le élection des consultants (ON En cours d'exécut TF / A7131 National Physical and Social A posteriori cadre d'un budget Open - National 60,000.00 0.00 2019-03-10 2022-08-02 2019-03-31 2019-05-14 2019-06-11 2019-07-11 2019-08-15 2019-09-19 2020-09-18 G) pour le développement et ion Investments déterminé la mise en place des AaGRs BJ-WACA -103678-CS-CQS / Recrutement d'un cabinet (fir Component 3: Strengthening Sélection fondée s me) pour la reconnaissance e En attente d'exéc IDA / 62140 National Physical and Social A posteriori ur les qualification Open - National 60,000.00 0.00 2019-03-24 2019-04-14 2019-05-28 2019-06-27 2019-08-01 2020-01-28 t délimitation sommaire de l' ution Investments s des consultants emprise de la zone d'interve ntion physiques et verts du p rojet BJ-WACA -103682-CS-CQS / Recrutement d'un Consultant Component 2: Strengthening Sélection fondée s En attente d'exéc chargé de l'élaboration du do IDA / 62140 the Policy and Institutional F A posteriori ur les qualification Open - National 20,000.00 0.00 2019-04-08 2019-04-29 2019-06-12 2019-07-12 2019-08-16 2020-02-12 ution cument de stratégie sectoriel ramework s des consultants le relative à la gestion durabl e de la zone côtière BJ-WACA -103674-CS-CQS / Recrutement d'un consultant Component 2: Strengthening Sélection fondée s pour l'élaboration d'un plan d En attente d'exéc IDA / 62140 the Policy and Institutional F A posteriori ur les qualification Open - National 30,000.00 0.00 2019-08-19 2019-09-09 2019-10-23 2019-11-22 2019-12-27 2020-06-24 e formation des cadres techn ution ramework s des consultants iques de l'ABE (formations te chniques sur les EIE, modélis ation, suivi des polluants) BJ-WACA -95414-CS-CQS / S Component 2: Strengthening Sélection fondée s élection d'un consultant pour En cours d'exécut TF / A7131 the Policy and Institutional F A posteriori ur les qualification Open - National 95,000.00 0.00 2019-04-29 2022-08-02 2019-05-14 2023-11-09 2019-06-03 2019-06-13 2019-07-07 2019-10-05 l'actualisation du Schéma dir ion ramework s des consultants ecteur d'aménagement du lit toral Page 4 BJ-WACA -95426-CS-CQS / R ecrutement d'un cabinet pou Component 2: Strengthening Sélection fondée s En cours d'exécut r actualiser les plans de gesti TF / A7131 the Policy and Institutional F A posteriori ur les qualification Open - National 80,000.00 0.00 2019-04-15 2022-08-02 2019-04-30 2019-05-15 2019-05-25 2019-06-14 2019-09-12 ion on du site Ramsar 1017 (fleu ramework s des consultants ve Couffo, Lac Ahémé, Chena l Aho et lagune côtière) BJ-WACA -108269-CS-QCBS / Component 2: Strengthening Sélection fondée s Etude d'inspection de surface Open - Internationa En attente d'exéc TF / A7131 the Policy and Institutional F A posteriori ur la qualité et le 400,000.00 0.00 2019-06-03 2019-06-24 2019-08-07 2019-09-04 2019-10-04 2019-11-08 2019-12-13 2020-12-12 des infrastructures abandonn l ution ramework coût ées sur le champ pétrolifère de Sèmè BJ-WACA -149245-CS-CQS / Etude de faisabilité technico- Component 3: Strengthening Sélection fondée s économique et contrôle de la En cours d'exécut TF / A7131 National Physical and Social A posteriori ur les qualification Open - National 19,000.00 0.00 2019-12-11 2022-08-02 2019-12-21 2020-01-11 2020-01-21 2020-02-14 2020-08-12 réhabilitation de la mare aux ion Investments s des consultants crocodiles et la réalisation de 5 forages à Tannou dans la c ommune d’Aplahoué BJ-WACA -195732-CS-CQS / Recrutement d’un cabinet po ur la réalisation de l’inventair Component 2: Strengthening Sélection fondée s En cours d'exécut e de la faune et établisseme TF / A7131 the Policy and Institutional F A posteriori ur les qualification Open - National 40,000.00 0.00 2020-09-28 2022-08-02 2020-10-13 2020-11-04 2020-11-16 2020-12-21 2021-04-20 ion nt de la liste rouge des espèc ramework s des consultants es et des écosystèmes de la réserve de biosphère transfr ontalière du Mono – Benin BJ-WACA -196219-CS-CQS / Sélection d'un Cabinet pour l Component 2: Strengthening Sélection fondée s En cours d'exécut e recrutement du personnel IDA / 62140 the Policy and Institutional F A posteriori ur les qualification Open - National 15,000.00 0.00 2020-10-07 2022-07-05 2020-10-21 2020-11-10 2020-11-11 2020-12-10 2021-02-08 ion complémentaire de l'Agence ramework s des consultants Béninoise pour l'Environnem ent BJ-WACA -209777-CS-CQS / Component 3: Strengthening Sélection fondée s Contrôle et surveillance des t Open - Internationa En cours d'exécut IDA / 62140 National Physical and Social A priori ur la qualité et le 2,750,000.00 0.00 2020-12-22 2021-01-17 2021-01-05 2021-01-20 2021-01-17 2021-06-05 2021-03-03 2021-07-19 2021-03-17 2021-09-10 2021-04-26 2021-11-01 2021-05-31 2023-01-21 ravaux de protection à long t l ion Investments coût erme de la côte transfrontali ère Bénin Togo BJ-WACA -235009-CS-CQS / Organisation physique et éle ctronique des archives pétrol ières de la Direction Général Component 3: Strengthening Sélection fondée s En cours d'exécut e des Hydrocarbures et autre IDA / 62140 National Physical and Social A posteriori ur les qualification Open - National 95,000.00 0.00 2021-06-25 2021-06-14 2021-07-05 2021-07-24 2021-07-25 2021-08-29 2021-11-27 ion s Combustibles Fossiles (DGH Investments s des consultants CF) et organisation physique et électronique des archives de l’Unité Intégrée de gestio n des projets (UIGP) BJ-WACA -387534-CS-CQS / Elaboration du Schéma direct Component 2: Strengthening Sélection fondée s En attente d'exéc eur d’aménagement (SDAC) IDA / D8470 the Policy and Institutional F A posteriori ur les qualification Open - National 90,000.00 0.00 2023-12-28 2024-01-18 2024-02-07 2024-03-08 2024-04-13 2024-08-11 ution et du Plan Directeur d'urbani ramework s des consultants sme (PDU) de la commune d e Grand Popo INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BJ-WACA -35471-CS-INDV / S élection d'un Consultant pour Component 3: Strengthening la réalisation de l'étude d'im En cours d'exécut IDA / V1160 National Physical and Social A posteriori Individuel Limited 17,000.00 0.00 2017-11-13 2017-11-15 2017-11-18 2018-01-12 2017-12-09 2018-02-02 2018-01-13 2018-02-12 pact environnementale relati ion Investments ve à l'ouverture souple de l'e mbouchure du fleuve Mono BJ-WACA -35482-CS-INDV / S élection d'un Consultant pour l'élaboration du cadre procéd Component 4: National Coor En cours d'exécut ural de gestion durable des r IDA / V1160 A posteriori Individuel Limited 17,000.00 0.00 2017-11-13 2017-11-15 2017-11-18 2017-12-09 2018-01-13 2018-02-12 dination ion essources naturelles des Aire s de Conservation Communa utaire de la Biodiversité (ACC B) BJ-WACA -35483-CS-INDV / S élection d'un consultant pour Component 6: National Coor En cours d'exécut IDA / V1160 A posteriori Individuel Limited 17,000.00 0.00 2017-11-20 2017-11-23 2017-12-14 2018-01-18 2018-01-21 l'élaboration du manuel d'ex dination ion écution du projet BJ-WACA -35487-CS-INDV / S élection d'un consultant pour Component 6: National Coor En cours d'exécut IDA / V1160 A posteriori Individuel Limited 16,000.00 0.00 2017-11-15 2017-11-15 2017-11-18 2017-12-09 2018-01-13 2018-02-12 l'élaboration du manuel de s dination ion uivi évaluation du projet BJ-WACA -35491-CS-INDV / R Component 6: National Coor En attente d'exéc ecrutement d'un consultant s IDA / V1160 A posteriori Individuel Limited 10,000.00 0.00 2017-11-13 2017-11-18 2017-12-09 2018-01-13 2018-07-12 dination ution pécialiste en gestion financiè re BJ-WACA -44416-CS-INDV / S election d'un consultant po Component 4: National Coor En cours d'exécut ur l'elaboration du manuel de IDA / V1160 A posteriori Individuel Limited 16,000.00 0.00 2018-02-05 2017-11-15 2018-02-10 2018-01-03 2018-03-03 2018-03-02 2018-04-07 2018-05-07 dination ion procedures administrative co mptable et financiere,du proj et BJ-WACA -43452-CS-INDV / R ecrutement du personnel cle du projet: Coordonnateur, Ch Component 4: National Coor En cours d'exécut ef projet GEF, Specialiste en IDA / V1160 A posteriori Individuel Open 220,000.00 0.00 2018-02-20 2018-06-29 2018-04-10 2018-05-01 2018-06-05 2018-08-04 dination ion Passation des Marches, Speci aliste en Gestion Financiere, Assistante de Direction, Un C onducteur de Vehicule Admin stratif BJ-WACA -44418-CS-INDV / S election d'un consultant pour Component 4: National Coor IDA / V1160 A posteriori Individuel Limited 16,000.00 15,945.98 Signé 2018-02-08 2017-11-15 2018-02-13 2018-01-03 2018-03-06 2018-03-02 2018-04-10 2018-03-23 2018-05-10 l'elaboration du manuel de pr dination ocedures de passation des m arches du projet BJ-WACA -44412-CS-INDV / S election d'un cabinet pour la Component 3: Strengthening determination des valeurs de IDA / V1160 National Physical and Social A posteriori Individuel Limited 19,000.00 0.00 Annulé 2018-02-04 2018-02-09 2018-03-02 2018-04-06 2018-05-06 reference des indicateurs du Investments cadre de resultat du projet W ACA Page 5 BJ-WACA -82878-CS-CQS / R ecrutement d'un expert pour l'élaboration du manuel de pr Component 2: Strengthening océdures et d'opérationnalis En cours d'exécut IDA / 62140 the Policy and Institutional F A posteriori Individuel Limited 35,000.00 0.00 2018-11-15 2023-11-14 2018-11-20 2018-12-11 2019-01-15 2019-07-14 ation de la Cellule Nationale ion ramework de Gestion du Littoral (Comit é intersectoriel sur la gestion intégrée de la zone côtière) e t la formation de ses membr es BJ-WACA -82887-CS-INDV / S élection d'un consultant pour Component 3: Strengthening En attente d'exéc l'élaboration du manuel de pr IDA / 62140 National Physical and Social A posteriori Individuel Limited 19,000.00 0.00 2018-11-19 2018-11-24 2018-12-15 2019-01-19 2019-02-18 ution océdure technique pour l'ouv Investments erture de la bouche du Roy BJ-WACA -82975-CS-INDV / R ecrutement de 5 chargés de Component 2: Strengthening mission (consultants individu En cours d'exécut TF / A7131 the Policy and Institutional F A posteriori Individuel Limited 120,000.00 0.00 2018-11-19 2022-08-02 2018-11-24 2018-12-15 2019-01-19 2019-07-18 els) pour la création des ACC ion ramework B, le suivi des AaGRs et l'app ui à la mise en œuvre des pla ns de gestion du projet BJ-WACA -82976-CS-INDV / S élection d'un consultant pour Component 2: Strengthening En cours d'exécut la réalisation de l'étude de r TF / A7131 the Policy and Institutional F A posteriori Individuel Open 60,000.00 0.00 2018-10-30 2022-08-02 2018-12-18 2019-01-08 2019-02-12 2019-03-14 ion éférence des indicateurs du c ramework adre de résultats du projet BJ-WACA -83521-CS-QCBS / Component 2: Strengthening Recrutement d'un Consultant En attente d'exéc IDA / 62140 the Policy and Institutional F A posteriori Individuel Limited 95,000.00 0.00 2018-12-16 2018-12-21 2019-01-11 2019-02-15 2019-08-14 pour la réalisation de l'étude ution ramework de préparation du projet WA CA-GCF BJ-WACA -82901-CS-CQS / R ecrutement d'un consultant p Component 4: National Coor En attente d'exéc IDA / 62140 A posteriori Individuel Limited 25,000.00 0.00 2018-12-09 2018-12-14 2019-01-04 2019-02-08 2019-04-09 our l'élaboration de la straté dination ution gie et du plan de communica tion du projet BJ-WACA -95384-CS-INDV / R ecrutement d'un consultant p our la réalisation du diagnost Component 2: Strengthening ic des plateformes des conve En attente d'exéc TF / A7131 the Policy and Institutional F A posteriori Individuel Limited 40,000.00 0.00 2019-02-11 2019-02-16 2019-03-09 2019-04-13 2019-06-12 ntions internationales relativ ution ramework es à l'environnement signées par le Bénin et élaboration u n document pour leur opérati onnalisation BJ-WACA -95470-CS-INDV / R Component 3: Strengthening ecruter des conseillers spéci En attente d'exéc TF / A7131 National Physical and Social A posteriori Individuel Limited 70,000.00 0.00 2019-03-29 2019-04-03 2019-04-18 2019-05-23 2020-05-22 alisés en production pour la ution Investments mise en oeuvre des plans de gestion des AaGR BJ-WACA -95397-CS-INDV / R ecruter une assistance techni Component 2: Strengthening En attente d'exéc que pour l'élaboration des cu TF / A7131 the Policy and Institutional F A posteriori Individuel Limited 60,000.00 0.00 2019-04-08 2019-04-13 2019-05-04 2019-06-08 2019-08-07 ution rricula pour le Master en Ingé ramework nierie Environnementale et M arine BJ-WACA -95468-CS-INDV / R ecrutement d'un consultant p Component 2: Strengthening En cours d'exécut our l'actualisation des plans IDA / 62140 the Policy and Institutional F A posteriori Individuel Limited 50,000.00 0.00 2019-06-17 2022-08-02 2019-06-22 2019-07-07 2019-08-11 2019-11-09 ion de gestion des ACCB Vodoun ramework tô et Togbin - Adounko BJ-WACA -95493-CS-CQS / S Sélection de cons Component 4: National Coor En cours d'exécut élection d'un cabinet pour le IDA / 62140 A posteriori ultants par entent Direct 24,000.00 0.00 2019-03-07 2022-08-02 2019-03-17 2019-05-21 2019-11-17 dination ion recutement du personnel co e directe mplémentaire BJ-WACA -95463-CS-CDS / A ssistance tecchnique de WW Component 2: Strengthening Sélection de cons F pour l'acquisition des équip En attente d'exéc IDA / 62140 the Policy and Institutional F A posteriori ultants par entent Direct 306,500.00 0.00 2019-05-02 2019-05-12 2019-06-26 2020-06-25 ements, des logiciels, la mise ution ramework e directe en place, la formation du per sonnel à l'utilisation et l'opér ationnalisation du SGGIE BJ-WACA -95407-CS-INDV / R ecrutement d'un Consultant I Component 2: Strengthening ndividuel pour l'Assistance T En attente d'exéc TF / A7131 the Policy and Institutional F A posteriori Individuel Limited 6,000.00 0.00 2019-05-15 2019-05-20 2019-06-10 2019-07-15 2020-01-11 echnique à la mise en œuvre ution ramework des activités du projet en lien avec le programme MAB-UNE SCO BJ-WACA -109146-CS-INDV / Recrutement du personnel d édié au projet FC (SGF, SPM) et de spécialistes de l'UIGP ( Component 4: National Coor En cours d'exécut Spécialiste en Suivi-Evaluatio IDA / V1160 A priori Individuel Open 412,000.00 0.00 2019-04-15 2019-04-12 2019-06-03 2019-07-19 2019-06-24 2019-08-26 2019-07-29 2019-09-27 dination ion n, Spécialiste en Communica tion, Spécialiste Sauvegarde Environnement, SSS, CG de l' UIGP, RTGIFC) et Agents d'a pp (ass. sécrétariat, 3 CVA) BJ-WACA -117472-CS-INDV / Recrutement complémentair Component 4: National Coor En cours d'exécut IDA / 62140 A priori Individuel Open 33,600.00 0.00 2019-05-31 2019-08-08 2019-07-19 2019-07-30 2019-08-09 2019-09-13 2019-11-12 e du personnel : Assistant du dination ion Responsable GEF BJ-WACA -117473-CS-INDV / Recrutement du personnel co Component 4: National Coor En cours d'exécut IDA / 62140 A posteriori Individuel Open 52,800.00 0.00 2019-06-05 2019-08-19 2019-07-24 2019-07-29 2019-08-14 2019-11-12 2019-09-18 2019-11-17 mplémentaire de l'UIGP: Cha dination ion rgée d'Administration BJ-WACA -114366-CS-INDV / Recrutement du personnel co Component 4: National Coor En cours d'exécut IDA / 62140 A posteriori Individuel Direct 62,400.00 0.00 2019-06-04 2019-08-19 2019-06-14 2019-04-19 2019-07-05 2019-08-26 2019-08-09 2020-02-05 mplémentaire de l'UIGP: Spé dination ion cialiste du Littoral Point focal technique BJ-WACA -114365-CS-INDV / Component 4: National Coor En cours d'exécut Recrutement d'un consultant IDA / 62140 A posteriori Individuel Direct 96,000.00 0.00 2019-05-14 2019-04-19 2019-05-24 2019-06-14 2019-07-19 2021-07-18 dination ion Assistant technique en gestio n BJ-WACA -117706-CS-INDV / Component 4: National Coor En attente d'exéc Recrutement d'un spécialiste IDA / 62140 A posteriori Individuel Open 28,800.00 0.00 2019-06-17 2019-08-05 2019-08-26 2019-09-30 2019-11-29 dination ution en développement social au profit de l'ABE Page 6 BJ-WACA -117710-CS-INDV / Component 4: National Coor En attente d'exéc Sélection d'un consultant ass IDA / 62140 A posteriori Individuel Limited 16,800.00 0.00 2019-06-06 2019-06-11 2019-07-02 2019-08-06 2020-02-02 dination ution istant en passation de march és BJ-WACA -117715-CS-INDV / Component 3: Strengthening En cours d'exécut Elaboration du Plan d'Actions TF / A7131 National Physical and Social A posteriori Individuel Limited 15,000.00 0.00 2019-06-10 2021-04-06 2019-06-15 2021-06-11 2019-07-06 2021-08-04 2019-08-10 2020-02-06 ion de Réinstallation des 5 forag Investments es à Tannou BJ-WACA -125443-CS-INDV / Recruter un consultant pour Component 4: National Coor En cours d'exécut IDA / 62140 A posteriori Individuel Direct 96,000.00 0.00 2019-08-05 2019-09-03 2019-08-15 2019-09-05 2019-10-10 2020-04-07 appuyer dans les activités de dination ion passation des marchés de l’U IGP BJ-WACA -125483-CS-CDS / Contrôle et surveillance des t Component 3: Strengthening Sélection de cons En attente d'exéc ravaux d'urgence de dragage IDA / 62140 National Physical and Social A posteriori ultants par entent Direct 40,000.00 0.00 2019-08-02 2019-08-12 2019-10-16 2020-04-13 ution et de refoulement de sédime Investments e directe nts dans la berge sud du fleu ve Mono à Grand Popo BJ-WACA -125524-CS-INDV / Etudes d'impact environnem Component 3: Strengthening En cours d'exécut ental et social de la sécurisat TF / A7131 National Physical and Social A posteriori Individuel Limited 20,000.00 0.00 2019-08-12 2022-08-02 2019-08-17 2019-09-07 2019-10-12 2020-04-09 ion ion de la mare aux crocodiles Investments et de la réalisation des 5 fora ges à Tannou BJ-WACA -125532-CS-INDV / Recrutement d'un chargé de Component 3: Strengthening mission (EKPANGBO G Gildas En cours d'exécut TF / A7131 National Physical and Social A posteriori Individuel Direct 7,200.00 0.00 2019-08-02 2022-08-02 2019-08-12 2019-09-02 2019-10-07 2020-01-05 ) pour la création des ACCB, l ion Investments e suivi des AaGRs et l'appui à la mise en œuvre des plans d e gestion du projet BJ-WACA -125533-CS-INDV / Recrutement d'un chargé de Component 3: Strengthening mission (BOUKARI Saliou) po En cours d'exécut TF / A7131 National Physical and Social A posteriori Individuel Direct 7,200.00 0.00 2019-08-02 2022-08-02 2019-08-12 2019-09-02 2019-10-07 2020-01-05 ur la création des ACCB, le su ion Investments ivi des AaGRs et l'appui à la mise en œuvre des plans de gestion du projet BJ-WACA -125534-CS-INDV / Recrutement d'un chargé de Component 3: Strengthening mission (BIAOU O. Oraly) pou En cours d'exécut TF / A7131 National Physical and Social A posteriori Individuel Direct 7,200.00 0.00 2019-08-02 2022-08-02 2019-08-12 2019-09-02 2019-10-07 2020-01-05 r la création des ACCB, le sui ion Investments vi des AaGRs et l'appui à la mise en œuvre des plans de gestion du projet BJ-WACA -125535-CS-INDV / Recrutement d'un chargé de Component 3: Strengthening mission (SONOU AGOUSSOU En cours d'exécut TF / A7131 National Physical and Social A posteriori Individuel Direct 7,200.00 0.00 2019-08-02 2022-08-02 2019-08-12 2019-09-02 2019-10-07 2020-01-05 Sabas) pour la création des A ion Investments CCB, le suivi des AaGRs et l'a ppui à la mise en œuvre des plans de gestion du projet BJ-WACA -128756-CS-INDV / Recrutement d'un Assistant T Component 4: National Coor En cours d'exécut echnique international (ATi) IDA / 62140 A priori Individuel Open 462,000.00 0.00 2019-08-27 2019-08-28 2019-10-15 2019-11-05 2019-12-10 2022-12-09 dination ion pour Unité Intégrée de Gestio ns des Projets du Secteur En vironnement BJ-WACA -129049-CS-INDV / Recrutement du personnel co Component 4: National Coor En cours d'exécut mplémentaire: Assistant Tec IDA / 62140 A posteriori Individuel Open 52,800.00 0.00 2019-09-02 2019-08-28 2019-10-21 2019-11-11 2019-12-16 2021-12-15 dination ion hnique National - Spécialiste en Développement Institutio nnel BJ-WACA -129337-CS-INDV / Recrutement d’un assistant t Component 2: Strengthening echnique pour le suivi et la m En cours d'exécut IDA / 62140 the Policy and Institutional F A posteriori Individuel Limited 19,000.00 0.00 2019-09-12 2022-08-02 2019-09-17 2019-10-08 2019-11-12 2019-12-03 ise en œuvre de projets sur l ion ramework es zones humides, les aires p rotégées et le changement cl imatique BJ-WACA -129364-CS-INDV / Recrutement du Coordonnat Component 4: National Coor En cours d'exécut eur Général de l'Unité Intégr IDA / 62140 A posteriori Individuel Open 72,000.00 0.00 2019-08-30 2019-10-01 2019-10-18 2019-11-08 2019-12-13 2021-12-12 dination ion ée de Gestion des Projets (UI GP) du secteur environneme nt BJ-WACA -158363-CS-INDV / Component 2: Strengthening Recrutement d'un Secrétaire En attente d'exéc IDA / 62140 the Policy and Institutional F A posteriori Individuel Open 47,520.00 0.00 2020-03-30 2020-05-03 2020-05-24 2020-06-22 2023-06-07 Comptable pour le compte d ution ramework e l'Agence Béninoise pour l'E nvironnement (ABE) BJ-WACA -165609-CS-INDV / Recrutement d'un consultant Component 2: Strengthening En cours d'exécut national pour finaliser les ét IDA / 62140 the Policy and Institutional F A posteriori Individuel Limited 19,000.00 0.00 2020-04-15 2022-08-02 2020-04-20 2020-05-20 2020-06-18 2020-08-02 ion udes de (pré) faisabilité tech ramework nique du projet WACA-GCF BJ-WACA -158354-CS-INDV / Recrutement d'un spécialiste Component 2: Strengthening En attente d'exéc en sauvegarde sociale pour l IDA / 62140 the Policy and Institutional F A posteriori Individuel Open 75,600.00 0.00 2020-05-20 2020-06-23 2020-07-14 2020-08-12 2023-07-28 ution e compte de l'Agence Bénino ramework ise pour l'Environnement (AB E) Spécialite 1 BJ-WACA -158348-CS-INDV / Recrutement d'un spécialiste Component 2: Strengthening En attente d'exéc en évaluation environnement IDA / 62140 the Policy and Institutional F A posteriori Individuel Open 75,600.00 0.00 2020-05-20 2020-06-23 2020-07-14 2020-08-12 2023-07-28 ution ale pour le compte de l'Agen ramework ce Béninoise pour l'Environn ement (ABE) Spécialite 1 BJ-WACA -158357-CS-INDV / Recrutement d'un spécialiste Component 2: Strengthening En attente d'exéc en sauvegarde sociale pour l IDA / 62140 the Policy and Institutional F A posteriori Individuel Open 75,600.00 0.00 2020-05-20 2020-06-23 2020-07-14 2020-08-12 2023-07-28 ution e compte de l'Agence Bénino ramework ise pour l'Environnement (AB E) Spécialite 2 BJ-WACA -158359-CS-INDV / Recrutement d'un spécialiste Component 2: Strengthening En attente d'exéc en sauvegarde sociale pour l IDA / 62140 the Policy and Institutional F A posteriori Individuel Open 75,600.00 0.00 2020-05-20 2020-06-23 2020-07-14 2020-08-12 2023-07-28 ution e compte de l'Agence Bénino ramework ise pour l'Environnement (AB E) Spécialite 2 Page 7 BJ-WACA -158352-CS-INDV / Recrutement d'un spécialiste Component 2: Strengthening En attente d'exéc en évaluation environnement IDA / 62140 the Policy and Institutional F A posteriori Individuel Open 75,600.00 0.00 2020-05-20 2020-06-23 2020-07-14 2020-08-12 2023-07-28 ution ale pour le compte de l'Agen ramework ce Béninoise pour l'environne ment (ABE) spécialite 2 BJ-WACA -158353-CS-INDV / Recrutement d'un spécialiste Component 2: Strengthening En attente d'exéc en évaluation environnement IDA / 62140 the Policy and Institutional F A posteriori Individuel Open 75,600.00 0.00 2020-05-20 2020-06-23 2020-07-14 2020-08-12 2023-07-28 ution ale pour le compte de l'Agen ramework ce Béninoise pour l'Environn ement (ABE) Spécialite 3 BJ-WACA -195722-CS-CDS / Recrutement d'un consultant Component 3: Strengthening Sélection de cons pour la réalisation de l'étude En cours d'exécut IDA / D2870 National Physical and Social A posteriori ultants par entent Direct 640,000.00 0.00 2020-09-25 2020-10-15 2020-10-05 2020-11-04 2021-01-03 d'impact environnemental et ion Investments e directe social et du PAR pour la prote ction à long terme de la côte transfrontalière Bénin-Togo BJ-WACA -196030-CS-CDS / Etude sur la situation des pla ntes envahissantes, les modè Component 3: Strengthening Sélection de cons les de gestion, de valorisatio En cours d'exécut TF / A7131 National Physical and Social A posteriori ultants par entent Direct 190,000.00 0.00 2020-09-30 2021-04-20 2020-10-10 2020-12-14 2021-12-14 n dans la sous-région et les a ion Investments e directe pplications possibles dans la zone du projet ainsi que la mi se en œuvre des actions défi nies par l’étude BJ-WACA -234938-CS-INDV / Renforcement de la capacité Component 3: Strengthening En cours d'exécut managériale et de recherche TF / A7131 National Physical and Social A posteriori Individuel Limited 16,000.00 0.00 2021-07-01 2021-10-13 2021-07-06 2021-07-27 2021-08-25 2021-09-24 ion de financement des membre Investments s des associations des ACCB et des guides touristiques BJ-WACA -234939-CS-INDV / Formation des animateurs d' ONG en éducation environne Component 3: Strengthening mentale au niveau des 4 ACC En cours d'exécut TF / A7131 National Physical and Social A posteriori Individuel Limited 9,000.00 0.00 2021-06-30 2021-10-14 2021-07-05 2021-07-26 2021-08-24 2021-10-08 B et des jeunes scolaires su ion Investments r l'éducation environnementa le et la réalisation des pépini ères autour des ACCB Adjam é, Naglanou et Lac Toho BJ-WACA -234940-CS-INDV / Evaluation indépendante des Component 3: Strengthening En cours d'exécut Activités alternatives Généra TF / A7131 National Physical and Social A posteriori Individuel Limited 19,000.00 0.00 2021-06-25 2021-11-01 2021-06-30 2021-07-02 2021-07-21 2021-08-23 2021-08-19 2021-10-03 ion trices de Revenus (AaGR) fin Investments ancées par le Projet WACA R ésIP Bénin BJ-WACA -235730-CS-INDV / Component 4: National Coor En cours d'exécut Evaluation à mi-parcours du IDA / 62140 A posteriori Individuel Limited 19,500.00 0.00 2021-06-25 2021-11-01 2021-06-30 2021-06-28 2021-07-21 2021-08-17 2021-08-14 2021-09-28 dination ion Projet WACA-RésIP Bénin BJ-WACA -236905-CS-INDV / Elaboration d’une stratégie d Component 3: Strengthening e surveillance et formation d En cours d'exécut TF / A7131 National Physical and Social A posteriori Individuel Limited 19,500.00 0.00 2021-07-15 2021-10-13 2021-07-20 2022-07-07 2021-08-10 2022-09-15 2021-09-08 2021-11-07 es agents de surveillance des ion Investments Aires Communautaires de Co nservation de Biodiversités ( ACCB) BJ-WACA -278871-CS-INDV / Recrutement d’un assistant t Component 2: Strengthening echnique pour le suivi et la m En attente d'exéc TF / A7131 the Policy and Institutional F A posteriori Individuel Direct 19,000.00 0.00 2022-05-04 2022-05-14 2022-05-22 2022-06-04 2023-06-04 ise en œuvre des projets sur ution ramework les zones humides, les aires protégées et le changement climatique année 2022 BJ-WACA -278873-CS-INDV / Elaboration des plans de gest Component 2: Strengthening En cours d'exécut ion des trois (03) nouvelles TF / A7131 the Policy and Institutional F A posteriori Individuel Limited 50,000.00 0.00 2022-05-02 2022-07-05 2022-05-05 2022-06-24 2022-07-20 2022-11-17 ion ACCB (Tannou, Chenal GBAG ramework A, Lagune Côtière de Ouidah) BJ-WACA -344268-CS-INDV / Component 3: Strengthening Etude d’évaluation qualitativ En cours d'exécut TF / A7131 National Physical and Social A posteriori Individuel Direct - National 19,500.00 0.00 2023-03-27 2023-06-06 2023-03-31 2023-04-18 2023-05-11 2023-07-10 e et quantitative des AaGRs ion Investments développées par le Projet BJ-WACA -349096-CS-CDS / Développement et mise en pl Component 3: Strengthening Sélection de cons ace des activités alternatives En cours d'exécut TF / A7131 National Physical and Social A posteriori ultants par entent Direct - National 18,000.00 0.00 2023-03-27 2023-04-03 2023-04-06 2023-06-05 2024-06-04 génératrices de revenus (AA ion Investments e directe GR) des ACCB de VODOUNTO , AVREKETE-DJEGBADJI ET TO GBIN-ADOUNKO BJ-WACA -349099-CS-CDS / Développement et mise en pl Component 3: Strengthening Sélection de cons En cours d'exécut ace des activités alternatives TF / A7131 National Physical and Social A posteriori ultants par entent Direct - National 9,118.00 0.00 2023-03-27 2023-06-06 2023-04-06 2023-06-05 2024-06-04 ion génératrices de revenus (AA Investments e directe GR) de l'ACCB du Chenal GB AGA BJ-WACA -349105-CS-CDS / Développement et mise en pl Component 3: Strengthening Sélection de cons En cours d'exécut ace des activités alternatives TF / A7131 National Physical and Social A posteriori ultants par entent Direct - National 9,940.00 0.00 2023-03-27 2023-06-06 2023-04-06 2023-06-05 2024-06-04 ion génératrices de revenus (AA Investments e directe GR) de l'ACCB de la BOUCHE DU ROY BJ-WACA -349110-CS-CDS / Développement et mise en pl ace des activités alternatives Component 3: Strengthening Sélection de cons En cours d'exécut génératrices de revenus (AA TF / A7131 National Physical and Social A posteriori ultants par entent Direct - National 21,933.00 0.00 2023-03-31 2023-06-06 2023-04-10 2023-06-09 2024-06-08 ion GR) des ACCB de LAC TOHO, Investments e directe NAGLANOU, ADJAME ET MAR E AUX CROCODILES DE TANN OU BJ-WACA -344262-CS-CDS / Etude de faisabilité techniqu e, économique et d'impact e Component 3: Strengthening Sélection de cons Direct - Internation En cours d'exame nvironnemental et social des IDA / 62140 National Physical and Social A priori ultants par entent 1,900,000.00 0.00 2023-06-06 2023-08-19 2023-06-09 2023-07-16 2024-01-12 al n travaux de stabilisation et d' Investments e directe aménagement de l'embouch ure du fleuve Mono Bouche d u Roy Page 8 BJ-WACA -399625-CS-CDS / Etude de faisabilité techniqu Component 3: Strengthening Sélection de cons Direct - Internation En attente d'exéc e et économique des travaux IDA / D8470 National Physical and Social A priori ultants par entent 1,578,000.00 0.00 2023-12-28 2024-01-01 2024-01-26 2024-08-23 al ution de stabilisation et d'aménage Investments e directe ment de l'embouchure du fle uve mono bouche du Roy Page 9