WB Plan/ Estimated STATUS/ N Procur. Review Description Actu Cost COMMENT o Method (Prior/ al (in US$) S Post) GOODS (CURRENT) SCINHP/G/SH/2016-1 / Office plan RFQ Post Completed 20,000 1 equipment purchase (for MoT and actua ALRI) l 15,257 SCINHP/G/SH/2016-2 / Office plan RFQ Post Completed 20,000 2 furniture purchase (for MoT and actua ALRI) l 9,642 plan RFQ Post Under SCINHP/G/SH/2016-3 / Software 40,000 3 Implementa purchase actua tion l - plan RFQ Post Under SCINHP/G/SH/2016-04 / Purchase of 99,000 4 Implementa two SUV vehicle (4x4) actua tion l - plan 179,000 Total Goods (Current) actu 24,899 al CONSULTING SERVICES (CURRENT) plan QCBS Prior Under SCINHP/QCBS/2016-01 / Feasibility 950,000 5 Implementa Study and Detail Design for Bridges actua tion l 1,117,229 SCINHP/CQS/2016-01 / Feasibility Under plan CQS Prior 6 Study and Detail Design for flood 400,000 Implementa management activities in Kurgan- tion Tube area actua l 453,960 SCINHP/CQS/2016-02 / Feasibility plan CQS Prior Under Study and Detail Design for flood 400,000 7 Implementa management activities in Kulyab actua tion area l 336,346 SCINHP/IC/2016-08 / International plan IC Post Under 100,000 8 consultant on flood management Implementa actua activities (for MoF PIU) tion l 92,500 plan IC Post Under SCINHP/IC/2016-01 / Local Bridge 21,760 9 Implementa Engineer Consultant (for MoT) actua tion l 12,000 SCINHP/IC/2016-02 / Local plan IC Post Under Environmental Consultant for the 16,320 10 Implementa development of the EIA studies for actua tion bridges rehabilitation (for MoT) l 11,520 SCINHP/IC/2016-03 / Local Social plan IC Post 16,320 Under Consultant for the development of 11 Implementa the RPF studies for capital works for actua tion the flood protection (for MoT) l 11,520 plan IC Post Under SCINHP/IC/2016-04 / Local Flood 17,000 12 Implementa Engineer Consultant (for ALRI) actua tion l 14,400 SCINHP/IC/2016-05 / Local Environmental Consultant for the plan IC Post Under 16,320 13 development of EIA and the RPF Implementa studies for capital works for the actua tion flood protection (for ALRI) l 11,520 SCINHP/IC/2016-06 / Local Social Under Consultant for the development of plan IC Post Implementa 14 16,320 the RPF studies for capital works for tion the flood protection (for ALRI) actua l 11,520 plan IC Post Under SCINHP/IC/2016-07 / Project 20,400 15 Implementa Coordinator (for MoF PIU) actua tion l 14,400 Total Consulting Services plan (Current) 1,974,440 actu 2,086,915 al AUDITS plan Block Prior Pending 20,500 16 SCINHP/LCS/2016 / Project Audit Implementa actua Audit tion l 10,500 Operating costs (Current) plan 72,525 actu 72,525 al Unallocated funds (Current) plan 253,535 actu 83,146 al GENERAL TOTAL (CURRENT) plan 2,500,000 actu 2,277,985 al Saved Funds from current PPA: 222,015 GOODS (ADDITIONAL) SCINHP/G/ICB/2017-1/ Heavy Proposed / 17 RFB Prior Machinery for MoT and ALRI 1,950,000 Additional Total Goods (Additional) 1,950,000 CONSULTING SERVICES (ADDITIONAL) Increase SCINHP/QCBS/2016-01 / Feasibility Current Proposed / 18 Study and Detail Design for Bridges Prior 1,120,000 Contract Additional (9 additional bridges) Scope SCINHP/CQC/2016-01 / Feasibility Increase Study and Detail Design for flood Current Proposed / 19 management activities in Kurgan- Prior 230,000 Contract Additional Tube area (Additional restoration Scope work) SCINHP/CQC/2016-02 / Feasibility Increase Study and Detail Design for flood Current Proposed / 20 Prior management activities in Kulyab 120,000 Contract Additional area (Additional restoration work) Scope SCINHP/LCS (or CQS)/2017-01 / Designs and Specifications for Crisis Management Center, Emergency Proposed / 21 CQS Post Communication System, Mobile 80,000 Additional Command and Communication Vehicle Total Consulting (Additional) 1,550,000 GENERAL TOTAL (ADDITIONAL) 3,500,000 GENERAL TOTAL (CURRENT) 2,500,000 GENERAL TOTAL (CURRENT+PROPOSED) 6,000,000 PROCUREMENT Tajikistan : Strengthening Critical Infrastructure against Natural Hazards PLAN General Information Country: Tajikistan Bank’s Approval Date of the Original Procurement Plan: 2016-09-15 Revised Plan Date(s): (comma delineated, leave blank if2024-01-11 none) Project ID: P158298 GPN Date: Project Name: Strengthening Critical Infrastructure against Natural Hazards Loan / Credit No: IDA / V0220, IDA / V1410, IDA / D2050, IDA / 60890 STATE INSTITUTION "Project Implementation Unit for Access to Green and Rural Development Finance" Executing Agency(ies): WORKS Activity Reference No. / Estimated Actual Am Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification High SEA/SH R Procurement D Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Contract Complet Description Component Review Type Method Amount (U ount (US$ and Recommendation Signed Contract o. h cess (Y/N) isk ocument Type atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes ion S$) ) for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned SCINHP/NCB-W-01 / Constru Making Critical Infrastructur ction of the NCMC in accorda Single Stage - One E 2020-10-0 IDA / D2050 e Resilient against Natural H Post Request for Bids Open - National 2,100,000.00 0.00 Canceled 2020-02-02 2020-01-28 2020-02-07 2020-02-07 2020-03-12 2020-03-08 2020-06-03 2020-04-12 nce with the approved detail nvelope 9 azards ed design and layout SCINHP-NCB-W-01 / Constru ction of the NCMC in accorda Strengthening Disaster Risk Single Stage - One E 1,849,759.5 2021-04-2 IDA / D2050 Post Request for Bids Open - National 2,100,000.00 Terminated 2020-07-21 2020-06-23 2020-07-26 2020-08-25 2020-07-23 2020-09-24 2020-08-07 2020-10-29 2020-11-02 nce with the approved detail Management Capacity nvelope 2 7 ed design and layout SCINHP/NCB-W-02 / NCMC c Request for Bids - onstruction in progress in acc Strengthening Disaster Risk Single Stage - One E Small Works SPD 2,199,074.2 2023-03-0 IDA / D2050 Post Request for Bids Open - National 2,100,000.00 Signed 2022-06-02 2022-06-02 2022-06-07 2022-07-07 2022-06-30 2022-08-06 2022-07-12 2022-09-10 2022-07-22 ordance with the approved d Management Capacity nvelope (1 envelope proce 0 9 esign solution and layout ss) GOODS Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCINHP/G/SH/2016-1 / Office Strengthening Disaster Risk Request for Quota Single Stage - One E IDA / V0220 Post Open - National 20,000.00 11,633.33 Completed 2016-10-26 2016-12-21 2016-08-26 2017-06-19 2016-09-17 equipment purchase (for MoT Management Capacity tions nvelope and ALRI) SCINHP/G/SH/2016-2 / Office Strengthening Disaster Risk Request for Quota Single Stage - One E IDA / V0220 Post Open - National 20,000.00 7,366.76 Completed 2016-11-06 2017-01-01 2017-01-23 2017-06-30 2017-02-04 furniture purchase (for MoT a Management Capacity tions nvelope nd ALRI) SCINHP/G/SH/2016-4 / Purch Request for Quota Single Stage - One E IDA / V0220 Post Open - National 60,000.00 0.00 Canceled 2016-11-07 2017-01-02 2017-07-01 ase of vehicle (4x4) tions nvelope SCINHP/G/SH/2016-04 / Purc Strengthening Disaster Risk Request for Quota Single Stage - One E IDA / V0220 Post Open - National 99,000.00 98,750.00 Completed 2016-11-14 2017-01-09 2017-06-05 2017-07-08 2017-07-23 hase of two SUV vehicle (4x4 Management Capacity tions nvelope ) SCINHP/G/ICB/2017-1 / Heav Making Critical Infrastructur Open - Internationa Single Stage - One E IDA / V0220 Prior Request for Bids 1,950,000.00 1,700,004.00 Completed 2017-05-08 2017-05-18 2017-05-13 2017-06-19 2017-06-24 2017-06-29 2017-07-24 2017-08-02 2017-08-28 2017-09-01 2018-02-24 2018-01-22 y Machinery for MOT and ALR e Resilient against Natural H l nvelope I azards SCINHP/G/SH/2016-3 / Softw Request for Quota Single Stage - One E IDA / V0220 Post Open - National 40,000.00 0.00 Canceled 2016-11-06 2017-01-01 2017-06-30 are purchase tions nvelope SCINHP/G/SH/2016-5 / Purch Making Critical Infrastructur Request for Quota Single Stage - One E ase of drilling equipment and IDA / V1410 e Resilient against Natural H Post Open - National 100,000.00 98,600.00 Completed 2018-01-15 2018-03-12 2017-06-23 2018-09-08 2017-10-23 tions nvelope components azards SCINHP/G-SH-1 / Procureme Strengthening Disaster Risk Request for Quota Single Stage - One E IDA / V1410 Post Open - National 100,000.00 59,132.00 Completed 2018-01-15 2018-03-12 2019-07-23 2018-09-08 2019-09-10 nt of seismic stations for IoG Management Capacity tions nvelope EES SCINHP/G-SH-4 / Purchase of Request for Quota Single Stage - One E 1C Sowftware for PIU MOF, PI IDA / V1410 Project Management Post Open - National 20,000.00 13,350.87 Completed 2018-01-15 2018-03-12 2018-01-15 2018-09-08 2019-04-19 tions nvelope G MOT and PMU ALRI SCINHP/G-SH-5 / Procureme Request for Quota Single Stage - One E nt of furniture for PIU MOF, PI IDA / V1410 Project Management Post Open - National 10,000.00 0.00 Canceled 2018-01-15 2018-03-12 2018-09-08 tions nvelope G MT, PMU ALRI SCINHP/G/SH/2016-03 / Soft Making Critical Infrastructur Request for Quota Single Stage - One E IDA / V0220 Post Open - National 100,000.00 99,000.00 Completed 2018-01-15 2018-03-12 2017-06-27 2018-09-08 2017-09-06 ware purchase for MOT e Resilient against Natural H tions nvelope azards SCINHP/G-SH-2 / Procureme Strengthening Disaster Risk Request for Quota Single Stage - One E nt of IT equipment including IDA / V1410 Post Open - National 35,000.00 28,351.82 Completed 2018-01-15 2018-03-12 2018-07-31 2018-09-08 2018-09-07 Management Capacity tions nvelope software for IoGEES SCINHP/G-ICB-1 / Procureme Strengthening Disaster Risk Open - Internationa Single Stage - One E nt and installation of ICT equi IDA / V0220 Post Request for Bids 1,740,000.00 0.00 Canceled 2021-05-26 2021-07-12 2021-05-31 2021-07-13 2021-07-12 2021-08-26 2021-08-11 2021-12-15 2021-09-15 2022-03-14 Management Capacity l nvelope pment for NCMC SCINHP/G-ICB-2 / Procureme Strengthening Disaster Risk Open - Internationa Single Stage - One E nt of Mobile Command Cente IDA / V0220 Post Request for Bids 1,200,000.00 0.00 Canceled 2021-05-26 2021-07-12 2021-05-31 2021-07-13 2021-07-12 2021-08-26 2021-08-11 2021-12-15 2021-09-15 2022-03-14 Management Capacity l nvelope rs and Communication Vehicl es SCINHP/G/ICB-03 / Procurem ent and Installation of ICT eq Contingent Emergency Resp Open - Internationa Single Stage - One E IDA / 60890 Prior Request for Bids 2,000,000.00 0.00 Signed 2023-03-01 2023-03-06 2023-03-06 2023-03-10 2023-04-17 2023-04-20 2023-05-17 2023-07-10 2023-06-21 2023-08-02 2023-12-31 uipment for National Crisis M onse Component l nvelope anagement Center (NCMC) SCINHP/G-NCB-2 / Procurem Strengthening Disaster Risk Single Stage - One E ent of office furniture and ac IDA / D2050 Post Request for Bids Open - National 320,000.00 0.00 Signed 2023-05-17 2023-06-07 2023-05-22 2023-07-03 2023-07-06 2023-08-02 2023-07-11 2023-09-06 2023-07-31 2024-03-04 Management Capacity nvelope cessories for NCMC SCINHP/G/RFQ-06 / Procure Strengthening Disaster Risk Request for Quota Open - Internationa Single Stage - One E ment of one Mini Mobile Com IDA / 60890 Post 280,000.00 0.00 Canceled 2023-10-18 2023-12-06 2023-12-13 Management Capacity tions l nvelope mand and Control Vehicle SCINHP/G/RFQ-07 / Procure Strengthening Disaster Risk Request for Quota Single Stage - One E IDA / 60890 Post Open - National 120,000.00 0.00 Signed 2023-11-17 2023-12-07 2023-11-24 2023-12-28 ment of one SUV Management Capacity tions nvelope SCINHP/G-RFQ-06 / Procure Strengthening Disaster Risk Request for Quota Open - Internationa Single Stage - One E Pending Impl ment of one Mini Mobile Com IDA / 60890 Post 280,000.00 0.00 2023-10-17 2023-12-12 2024-06-09 Management Capacity tions l nvelope ementation mand and Control Vehicle Page 1 NON CONSULTING SERVICES Activity Reference No. / Bid Evaluation Report Loan / Credit N Market Approac Procurement Pro Prequalification Estimated Am Actual Amount Process St Draft Pre-qualification Prequalification Evalu Draft Bidding Docum Specific Procurement Bidding Documents a Proposal Submission / Description Component Review Type Method and Recommendation Signed Contract Contract Completion o. h cess (Y/N) ount (US$) (US$) atus Documents ation Report ent / Justification Notice / Invitation s Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Combined Evaluation Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Expression of Interest Short List and Draft R Request for Proposals Opening of Technical Evaluation of Technic Description Component Review Type Method Process Status Terms of Reference Report and Draft Neg Signed Contract Contract Completion o. h unt (US$) (US$) Notice equest for Proposals as Issued Proposals / Minutes al Proposal otiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCINHP/QCBS/2016-01 / Fea Making Critical Infrastructur Quality And Cost- Open - Internationa sibility Study and Detail Desi IDA / V0220 e Resilient against Natural H Prior 950,000.00 2,234,082.35 Completed 2016-09-14 2016-10-05 2016-10-10 2016-11-18 2016-10-21 2016-12-16 2016-11-21 2017-01-15 2016-12-01 2017-02-19 2017-01-04 2017-03-26 2017-01-10 2018-03-26 2018-11-17 Based Selection l gn for Bridges azards SCINHP/CQS/2016-01 / Feasi Making Critical Infrastructur bility Study and Detail Desig Consultant Qualifi IDA / V0220 e Resilient against Natural H Prior Open - National 400,000.00 527,462.00 Completed 2016-10-20 2016-11-02 2016-11-10 2016-11-02 2016-12-24 2016-12-20 2017-01-23 2016-12-23 2017-02-27 2016-12-30 2017-08-26 2018-12-30 n for flood management acti cation Selection azards vities in Kurgan-Tube area (lo cal company for ALRI) SCINHP/CQS/2016-02 / Feasi Making Critical Infrastructur bility Study and Detail Desig Consultant Qualifi IDA / V0220 e Resilient against Natural H Prior Open - National 400,000.00 446,316.00 Completed 2016-10-20 2016-11-02 2016-11-10 2016-11-02 2016-12-24 2016-12-20 2017-01-23 2016-12-23 2017-02-27 2017-01-10 2017-08-26 2021-06-03 n for flood management acti cation Selection azards vities in Kulyab area (local co mpany for ALRI) SCINHP/CQS/2017-01 / Prepa ration of detailed design and Strengthening Disaster Risk Consultant Qualifi bidding documents and speci IDA / V0220 Post Open - National 80,000.00 0.00 Canceled 2017-06-01 2017-06-22 2017-08-05 2017-09-04 2017-10-09 2018-04-07 Management Capacity cation Selection fications for the National Crisi s Management Center (NCMC ) SCINHP/QCBS-2017-01 / Pre paration of detailed design a nd bidding documents for the Strengthening Disaster Risk Quality And Cost- Open - Internationa National Crisis Management IDA / D2050 Post 430,000.00 526,341.24 Signed 2018-01-29 2018-01-08 2018-02-19 2018-01-31 2018-04-04 2018-06-13 2018-05-02 2018-08-10 2018-06-01 2018-10-05 2018-07-06 2018-10-26 2018-08-10 2018-12-26 2019-08-10 Management Capacity Based Selection l Center (NCMC), technical spe cifications of ICT equipments and Mobile Command and Co mmunication Vehicles SCINHP-CS-CQS-01 / Develo pment of Operational Manual for NCMC and capacity buildi ng of CMC staff by conductin Strengthening Disaster Risk Consultant Qualifi Open - Internationa IDA / V0220 Post 90,000.00 90,056.00 Signed 2021-11-22 2021-07-15 2021-12-13 2022-01-26 2021-12-15 2022-02-25 2022-02-16 2022-04-01 2022-02-21 2022-09-28 g trainings on CMC exploitati Management Capacity cation Selection l on, communication system w ork in crises, mobile commun ication vehicle work and Coor dination Center exploitation SCINHP-CS-CQS-02 / SUPERV ISION OF CONSTRUCTION "N Strengthening Disaster Risk Consultant Qualifi IDA / D2050 Post Open - National 30,000.00 0.00 Completed 2022-06-16 2022-07-14 2022-07-07 2022-08-20 2022-08-10 2022-09-19 2022-08-17 2022-10-24 2022-08-22 2023-06-21 2023-04-19 ATIONAL CRISIS MANAGEME Management Capacity cation Selection NT CENTER" (NCMC) SCINHP/LCS/2016 / Project A IDA / V0220 Post Least Cost Selecti Open - Internationa 20,500.00 0.00 Canceled 2017-05-01 2017-05-22 2017-07-05 2017-08-02 2017-09-01 2017-10-06 2017-11-10 2018-05-09 udit on l SCINHP-CS-CQS-2023 / Local Consultant Qualifi Service Provider to conduct E IDA / 60890 Project Management Post Open - National 65,000.00 0.00 Signed 2023-08-07 2023-08-04 2023-08-28 2023-10-11 2023-10-10 2023-11-10 2023-09-26 2023-12-15 2023-09-27 2024-06-12 cation Selection nd of Project Impact Evaluati on INDIVIDUAL CONSULTANTS Activity Reference No. / Loan / Credit N Market Approac Contract Type Estimated Amo Actual Amount Invitation to Identifie Draft Negotiated Cont Description Component Review Type Method Process Status Terms of Reference Signed Contract Contract Completion o. h unt (US$) (US$) d/Selected Consultant ract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCINHP/IC/2016-01 / Local B Strengthening Disaster Risk Individual Consult IDA / V0220 Post Open 21,760.00 19,000.00 Completed 2016-10-13 2016-06-20 2016-12-01 2016-09-27 2016-12-22 2016-10-03 2017-01-26 2016-10-06 2017-07-25 2018-05-04 ridge Engineer Consultant (fo Management Capacity ant Selection r MoT) SCINHP/IC/2016-02 / Local E nvironmental Consultant for t Strengthening Disaster Risk Individual Consult IDA / V0220 Post Open 16,320.00 11,520.00 Signed 2016-10-13 2016-06-20 2016-12-01 2016-10-31 2016-12-22 2016-11-01 2017-01-26 2016-11-04 2017-07-25 he development of the EIA st Management Capacity ant Selection udies for bridges rehabilitatio n (for MoT) SCINHP/IC/2016-03 / Local S Strengthening Disaster Risk Individual Consult IDA / V0220 Post Open 16,320.00 11,520.00 Signed 2016-10-13 2016-06-24 2016-12-01 2016-07-28 2016-12-22 2016-08-01 2017-01-26 2016-08-04 2017-07-25 ocial Consultant (for MoT) Management Capacity ant Selection SCINHP/IC/2016-04 / Local Fl Strengthening Disaster Risk Individual Consult IDA / V0220 Post Open 17,000.00 14,400.00 Signed 2016-10-13 2016-06-20 2016-12-01 2016-09-29 2016-12-22 2016-10-13 2017-01-26 2016-10-16 2017-07-25 ood Engineer Consultant (for Management Capacity ant Selection ALRI) SCINHP/IC/2016-05 / Local E nvironmental Consultant for t Strengthening Disaster Risk Individual Consult he development of EIA and t IDA / V0220 Post Open 16,320.00 11,520.00 Signed 2016-10-13 2016-08-09 2016-12-01 2016-10-31 2016-12-22 2016-11-08 2017-01-26 2016-11-12 2017-07-25 Management Capacity ant Selection he RPF studies for capital wo rks for the flood protection (f or ALRI) SCINHP/IC/2016-06 / Local S ocial Consultant for the devel Strengthening Disaster Risk Individual Consult opment of EIA and the RPF st IDA / V0220 Post Open 16,320.00 11,520.00 Signed 2016-10-13 2016-08-09 2016-12-01 2016-10-13 2016-12-22 2016-10-14 2017-01-26 2016-10-17 2017-07-25 Management Capacity ant Selection udies for capital works for th e flood protection (for ALRI) SCINHP/IC/2016-07 / Project Strengthening Disaster Risk Individual Consult IDA / V0220 Post Open 20,400.00 92,087.00 Signed 2016-10-13 2016-07-14 2016-12-01 2016-08-08 2016-12-22 2016-08-09 2017-01-26 2016-08-12 2017-07-25 Coordinator (for MoF PIU) Management Capacity ant Selection SCINHP/IC/2016-08 / Internat Strengthening Disaster Risk Individual Consult onal consultant on flood man IDA / V0220 Post Open 100,000.00 92,500.00 Completed 2016-10-20 2016-11-02 2016-12-08 2016-12-05 2016-12-29 2016-12-23 2017-02-02 2016-12-27 2017-08-01 2018-08-13 Management Capacity ant Selection agement activities (for MoF PIU) SCINHP-CS-IC-01 / FM Consul Individual Consult IDA / V1410 Project Management Post Open 50,400.00 42,000.00 Completed 2018-01-10 2017-10-10 2018-02-28 2017-11-30 2018-03-21 2017-12-01 2018-04-25 2017-12-21 2018-10-22 2022-12-19 tant for MOF PIU (full-time) ant Selection SCIHP-CS-IC-04 / Translator/ Individual Consult Enterpreter Consultant for M IDA / D2050 Project Management Post Open 50,400.00 16,800.00 Signed 2018-03-01 2018-02-20 2018-04-19 2018-04-18 2018-05-10 2018-05-01 2018-06-14 2018-05-13 2018-12-11 ant Selection OF PIU (full-time) Page 2 SCINHP-CS-IC-02 / Environm IDA / D2050 Project Management Post Direct Selection Direct 58,560.00 46,080.00 Signed 2018-12-17 2018-12-17 2018-12-27 2018-12-19 2019-03-02 2018-12-25 2019-08-29 ent Safeguards Coordinator f or MOF PIU SCINHP-CS-IC-03 / Social iss IDA / D2050 Project Management Post Direct Selection Direct 58,560.00 46,080.00 Signed 2018-12-17 2018-12-17 2018-12-27 2018-12-19 2019-03-02 2018-12-25 2019-08-29 ues Consultant for MOF PIU SCINHP/CQS/2019-01 / Detai Making Critical Infrastructur led Design of Hoshadi canal s IDA / D2050 e Resilient against Natural H Post Direct Selection Direct 156,127.00 156,127.00 Completed 2019-07-14 2019-07-10 2019-07-24 2019-07-17 2019-09-27 2019-08-14 2020-03-25 2021-05-17 ite and Author Supervision in azards Kurgantyube Area SCINHP/CS-IC-2020-1 / Engin Strengthening Disaster Risk Individual Consult eer-consultant on constructio IDA / D2050 Post Open 18,000.00 21,600.00 Signed 2020-03-10 2020-07-28 2020-04-28 2021-02-01 2020-05-19 2021-02-02 2020-06-23 2021-02-17 2020-12-20 Management Capacity ant Selection n supervision SCINHP/CS-IC-2020-02 / Info Individual Consult rmation and Communications IDA / D2050 Project Management Post Open 18,000.00 19,200.00 Signed 2020-03-10 2020-03-10 2020-04-28 2020-07-27 2020-05-19 2020-07-29 2020-06-23 2020-08-07 2020-12-20 ant Selection Technology Consultant SCINHP/CS-IC-2020-03 / Proc Individual Consult IDA / D2050 Project Management Post Open 10,800.00 10,800.00 Completed 2020-05-17 2020-05-19 2020-07-05 2020-05-27 2020-07-26 2020-05-27 2020-08-30 2020-06-05 2021-02-26 2020-12-29 urement Consultant ant Selection SCINHP/CS-IC-2021-01 / Proc Individual Consult IDA / D2050 Project Management Post Open 10,800.00 10,800.00 Completed 2022-02-09 2022-02-10 2022-03-05 2022-02-24 2022-03-10 2022-02-25 2022-03-20 2022-03-02 2022-08-17 2022-08-05 urement Consultant ant Selection SCINHP-CS-SSS-01 / Detail a nd disclose all shop drawings , to prepare a bill of quantitie Strengthening Disaster Risk s and cost estimates based o IDA / D2050 Post Direct Selection Direct 11,000.00 11,425.29 Completed 2022-05-26 2022-05-26 2022-06-05 2022-05-27 2022-06-16 2022-05-31 2022-07-11 2022-07-01 Management Capacity n adapted shop drawings and determine the scope of existi ng defects for the NCMC buil ding of the CoESCD RT SCINHP/CS/IC/2022-01 / Proc Individual Consult IDA / D2050 Project Management Post Open - National 10,800.00 0.00 Signed 2022-09-25 2022-09-27 2022-11-13 2022-10-18 2022-12-04 2022-10-18 2023-01-08 2022-10-25 2023-07-07 urement Consultant ant Selection MOFPIU-TPRDP-DC-2022-01 / Strengthening Disaster Risk IDA / D2050 Post Direct Selection Direct - National 6,500.00 0.00 Completed 2022-11-28 2022-11-28 2022-12-04 2022-12-06 2022-12-13 2022-12-14 2023-02-11 2023-04-04 Environmental Consultant (s Management Capacity hort-term) MOFPIU-TPRDP-DC-2022-02 / Strengthening Disaster Risk Social Development Consulta IDA / D2050 Post Direct Selection Direct - National 6,500.00 0.00 Completed 2022-11-28 2022-11-28 2022-12-04 2022-12-13 2022-12-13 2022-12-21 2023-02-11 2023-04-04 Management Capacity nt (short-term) SCINHP/CS/IC/2022-02 / Fina Individual Consult IDA / D2050 Project Management Post Open - National 8,400.00 0.00 Completed 2022-12-11 2022-12-08 2023-01-04 2023-01-23 2023-01-07 2023-01-23 2023-01-13 2023-01-26 2024-01-03 2023-10-20 ncial Management Consultan ant Selection t SCINHP-CS-DS-2023 / ICT Eq Strengthening Disaster Risk uipment Delivery and Installa IDA / 60890 Post Direct Selection Direct - National 35,000.00 0.00 Signed 2023-11-09 2023-11-13 2023-11-17 2023-11-13 2023-11-24 2023-11-22 2023-12-24 Management Capacity tion Supervision Services for the NCMC Page 3